VICTORVILLE CITY COUNCIL
VICTORVILLE LIBRARY BOARD OF TRUSTEES
SOUTHERN CALIFORNIA LOGISTICS AIRPORT AUTHORITY
SUCCESSOR AGENCY TO THE REDEVELOPMENT AGENCY
THE CITY AS HOUSING ASSETS SUCCESSOR
JOINT POWERS FINANCING AUTHORITY
VICTORVILLE WATER DISTRICT
NOTICE: The Mayor has called a Special Meeting
pursuant to Government Code Section 54956.

Tuesday, November 26, 2024
6:00 p.m. Special Council Meeting
The

City

Council

holds

its

business

meetings

in

public

in

accordance

with

the

requirements

of

the

Ralph
M.

Brown

Act,

its

established

policies

and

procedures,

and

its

adopted

parliamentary

authority.

The
Council

strives

to

carry

out

its

meetings

in

an

atmosphere

of

professionalism

with

full

participation

by
members

of

the

body

and

the

public.

As

such,

the

Presiding

Officer

is

empowered

to

govern

City

Council
Meetings

to

foster

the

efficient

and

fair

administration

of

City

business

and

reserves

the

right

to

enforce
(or

cause

to

be

enforced)

the

Meeting

Rules

of

Conduct

and

Decorum

as

set

forth

in

Chapter

5 of

the

City
Council Policy and Procedures Manual.

The

City

Council

welcomes

and

encourages

public

participation

and

invites

the

community

to

attend

in
person.

City

Council

Meetings

will

be

held

in-person

at

City

Hall

in

Council

Chambers.

Remote

viewing

of
our

Council

Meetings

is

available

through

YouTube,

but

public

comments

must

be

given

in-person

at

the
meeting or in advance as noted below.

Public

Comments:

Members

of

the

public

may

submit

comments

electronically

to
[email protected]

by

4 p.m.

the

day

of

the

meeting

to

be

distributed

to

City

Council.

Participants
are

invited

to

address

the

Council

on

agendized

and

non-agendized

topics

at

the

beginning

of

the
meeting.

Public

comments

will

be

no

longer

than

three

(3)

minutes

per

community

member.

Should

a
speaker

conclude

their

comments

prior

to

the

expiration

of

three

(3)

minutes,

the

speaker

waives

the

right
to

speak

for

any

remaining

amount

of

time.

For

further

information

about

how

to

address

the

Council,
please refer to the City's website at
victorvilleca.gov/agendas
.

LEVINE

ACT

DISCLOSURE:

Pursuant

to

the

Levine

Act

(Govt.

Code

section

84308),

any

party

to

a
permit,

license,

contract,

or

other

entitlement

before

the

Victorville

City

Council

is

required

to
disclose

on

the

record

any

campaign

contribution,

including

aggregated

contributions,

of

more
than

$250

made

by

the

party

or

the

party's

agents

within

the

preceding

12 months

to

any

City
official.

Participants

and

agents

are

requested

to

make

this

disclosure

as

well.

The

disclosure
must

include

the

name

of

the

party,

participant,

or

agent,

and

any

other

person

making

the
contribution;

the

name

of

the

recipient,

the

amount

of

the

contribution,

and

the

date

the
contribution was made.

In

compliance

with

the

Americans

with

Disabilities

Act,

if

you

need

special

assistance

to

participate

in

this
meeting,

please

contact

the

City

Clerk's

office

at

(760)

955-5188

no

later

than

24 hours

prior

to

the
meeting.

6:00 p.m. Special Session

Call to Order

Roll Call

Invocation:

Pledge of Allegiance: Police Captain Randy German

City Clerk Presents Agenda/Revisions to Agenda

Conflict of Interest Declarations
Any

items

on

this

agenda

that

might

be

a

conflict

of

interest

to

any

Council
Members/Board Members should be identified at this time

Introduction to Public Comments

Public Comments

WRITTEN COMMUNICATIONS

1. Runway 17/35 Reconstruction Phase V, Project CC24-126, Amendment One

Recommendation:

That the Southern California Logistics Airport Authority Board of Directors:
(1)

Adopt

Resolution

No.

SCLAA

24-007

increasing

budgeted

Airport

Operations
expenses of $211,530.17; and
(2)

Approve

Amendment

One

to

the

Construction

Contract

with

Pave-Tech

Inc.,

for
Runway

17/35

Reconstruction

Phase

V,

Project

CC24-126,

increasing

the

total

not
to exceed compensation by $211,530.17 to $5,145,079.44.

2. Motion

to

Suspend

the

Rules

in

accordance

with

the

City

Council

Policy

and
Procedure

Manual,

Chapter

5,

Section

II,

Subsection

M

related

to

a

failed

motion
from

the

November

19,

2024,

City

Council

Meeting

regarding

the

consideration

of
the formation of a City-Wide Community Facilities District

3. Motion

to

agendize

the

Formation

of

Community

Facilities

District

No.

2024-01

to
provide

Municipal

Services

to

the

Regular

City

Council

Meeting

of

December

17,
2024

Adjournment

Item Number: 1
Board of Directors
Written Communications
Meeting of: November 26, 2024
Submitted By:

C. Eric Ray, Airport Director
Subject:

Runway 17/35 Reconstruction Phase V, Project CC24-126, Amendment One Recommendation:

That the Southern California Logistics Airport Authority Board of Directors:
(1) Adopt Resolution No. SCLAA 24-007 increasing budgeted Airport Operations expenses of $211,530.17; and
(2) Approve Amendment One to the Construction Contract with Pave-Tech Inc., for Runway 17/35 Reconstruction Phase V, Project CC24-126, increasing the total not to exceed compensation by $211,530.17 to $5,145,079.44.

Fiscal Impact:

This Amendment requires an additional budget appropriation of $211,530.17 to the Airport Operations fund for this project. Resolution No. SCLAA 24-007 increases the current fiscal year 2024-2025 budget by $211,530.17 and is presented herein for your approval. Cash reserves are sufficient to accommodate the requested budget appropriation. The budget is outlined below:

Original Budget
Balance
4500125-55320-95144 Airport Operations $1,099,872.37
Revised Budget
Balance
4500125-55320-95144 Airport Operations $1,311,402.54
3 8
4 7
Strategic Plan Goal:

Goal E. Invest in Infrastructure: Project CC24-126 invests in airfield infrastructure by providing a durable surface solution for Runway 3/21 as part of Phase V of Runway 17/35 Reconstruction Project.

Background:

The Southern California Logistics Airport (“SCLA”) airfield consists of two commercial- length runways and nine taxiways. The main runway, Runway 17/35, consists of aged asphalt and newer concrete pavement sections. The asphalt sections have been of particular concern for Airport users since asphalt rutting, pitting, cracking, and breaking are major safety concerns as these conditions create foreign object debris that collect on the runway and taxiways, becoming major hazards to aircraft. Several asphalt sections have been replaced with concrete pavement in phases over the last few years as FAA funding has become available. Project CC24-126 is continuing the asphalt reconstruction efforts on Runway 17/35 to improve runway pavement and overall safety for aircraft operations. Ancillary to the runway pavement reconstruction, the Runway 3/21 blast pad will be replaced and extended and sections of Runway 17/35 shoulder will be milled down and covered with fresh asphalt. The Southern California Logistics Airport Authority (“SCLAA”) Board of Directors approved the award of a Construction Contract to Pave Tech, Inc, (“Pave-Tech”) to facilitate the Runway 17/35 Reconstruction – Phase V, Project CC24-126, on October 15, 2024, and construction is underway.

Runway 3/21 consists almost entirely of aged asphalt runway that was designed primarily for use by smaller military aircraft. A recent FAA inspection noted significant sections of Runway 3/21 showing signs of distress requiring repair, in addition to numerous markings requiring complete removal and replacement. The markings removal and replacement will need to be completed by January 1, 2025. Moreover, staff is concerned that the future phases of the Runway 17/35 Reconstruction Project will inflict more damage to the aged Runway 3/21 as it will be relied upon to accommodate all air traffic while Runway 17/35 is under construction. Given this reality, it is of paramount importance that Runway 3/21 be repaired before future sections of Runway 17/35 are reconstructed.

Pave-Tech, the contractor working on Phase V of the Runway 17/35 Reconstruction project, has proposed the application of a Gilsonite-based Asphalt Sealer product called GSB-88 for Runway 3/21 after “micro milling” the markings off the pavement. The micro milling process is highly effective at removing very thin layers of cracked and peeling paint off asphalt while imparting very little scarring and damage to the finished surface. GSB- 88 serves to replace some of the material removed by micro milling, fills small cracks, and restores asphalt pavements by reintroducing the oils and resins that have been lost through oxidation and normal wear and tear. GSB-88 has become widely accepted and is currently in use on runways around the globe. GSB-88 is FAA approved for use on runways and is expected to extend the useful life of the current surface by several years, thus providing a window for Runway 17/35 to be fully reconstructed while allowing continued operations on Runway 3/21.
3 8
4 7
Lastly, this is the most opportune time to perform this regenerative work on Runway 3/21 as it is now closed to accommodate the construction on Runway 17/35.

Discussion:

The urgent repairs that are needed on Runway 3/21 necessitate the expertise of a construction firm that is capable of successfully micro milling the asphalt and appropriately applying the GSB-88. To procure these services, SCLAA staff requested a proposal from Pave-Tech, in accordance with Municipal code section 2.28.180, which governs Construction Contract Change Orders. Staff received the attached proposal (“Proposal”) for the necessary surface preparation and installation of the GSB-88 in the amount of $211,530.17. Staff reviewed the Proposal and found the costs to be reasonable given the urgent nature of the repairs on approximately 860,000 square feet area of Runway 3/21 requiring improvement. Moreover, both items of work; micro milling and GSB-88 application are bid items pertaining to the existing Runway 17/35 project.

Approval of Amendment One to the existing Construction Contract with Pave-Tech, will allow Pave-Tech to perform this much needed work to Runway 3/21 as a contract amendment at an expected discount to performing a separate procurement. Because this scope of work is identical to two items of the Runway 17/35 Reconstruction Project, economies of scale and saving of mobilization costs greatly benefit the SCLA. The Pave- Tech bid for the original milling and asphalt emulsion work for Phase V of Runway 17/35, consisting of approximately 3,000 sq. ft. of surface area, was bid at $5.29 per sq. ft. The other bidder for Phase V bid that work at $5.20 per sq. ft., and the engineers estimate for this work was at $5.50 per sq. ft. However, the Pave-Tech Proposal price for milling and resurfacing 860,000 sq. ft. of Runway 3/21 is approximately $.25 per sq. ft., demonstrating a significant price reduction caused by the realization of economies of scale due to the enormity of the volume. Furthermore, since Pave-Tech is already onsite with their equipment and personnel, they have minimal mobilization expenses included in their Proposal.

Each time a runway is closed, SCLA staff must notify the FAA and issue an official Notice to Air Missions that informs notices pilots of the runway closure. Also, staff must install warning signs in the form of illuminated X shaped barricades at each end of the runway to demonstrate to inbound pilots that the runway is closed. Staff must also secure the runway by placing physical barriers and temporary signs at each taxiway entrance to prevent a plane from inadvertently entering the runway. Staff spends a significant amount of time planning runway closures with tenants, who are not fond of runway closures because of the impact that closures have on their ability to receive and return aircraft.

The current closure of Runway 3/21 as part of Phase V presents an ideal time to complete the FAA directed milling and resurfacing work. To perform this work at another time would require staff to redundantly spend time and resources to close Runway 3/21. The opportunity to perform this work is now, given the current closure of Runway 3/21 and the advantageous cost savings presented by Pave-Tech.

Therefore, staff requests and recommends that the SCLAA Board of Directors approve 3 8
4 7
Amendment One to the Construction Contract by and between the SCLAA and Pave- Tech Inc., increasing the total not to exceed compensation by $211,530.17 to $5,145,079.44, for Runway 17/35 Reconstruction Phase V, Project #CC24-126, and adopt Resolution No. SCLAA 24-007, increasing budgeted operations expenses in the amount of $211,530.17.

Staff remains available for any questions or comments you may have.

CER/see
Attachments: A. Site Map
B. Resolution No. SCLAA 24-007
C. Amendment One
D. Pave-Tech Inc. Proposal
E. Municipal Code 2.28.180

dd,D
Ed

^ŝƚĞDĂƉ
Copyright nearmap 2015, Maxar
Runway 17/35
Reconstruction - Phase V
Project Locations 3/21
3/21
3/21
17/35
3/21

ATTACHMENT B

Resolution No. SCLAA 24-007

RESOLUTION NO. SCLAA 24-007

A RESOLUTION OF THE BOARD OF DIRECTORS OF THE SOUTHERN CALIFORNIA

LOGISTICS AIRPORT AUTHORITY AMENDING THE ANNUAL BUDGET FOR FISCAL YEAR 2024-2025

WHEREAS, the Executive Director of the Southern California Logistics Airport Authority (“SCLAA”) did heretofore submit to the Board of Directors an estimate of the expenditures and revenues of the City departments and offices, together with a proposed budget for the fiscal year 2024-2025; and

WHEREAS, copies of said budget were prepared and distributed to the SCLAA Board of Directors, approved by the SCLAA Board of Directors prior to June 30, 2024, and have been available for the inspection by the public in the office of the Authority Secretary of the SCLAA; and

WHEREAS, after preparation of the budget, a need to amend the budget is being recommended to the SCLAA Board of Directors for approval; and

WHEREAS, the Executive Director or his designee will provide all necessary justification for the budget amendment as an attachment to this resolution or in the associated SCLAA agenda report.

NOW, THEREFORE, THE BOARD OF DIRECTORS OF THE SOUTHERN
CALIFORNIA LOGISTICS AIRPORT AUTHORITY HEREBY RESOLVE AS FOLLOWS:

SECTION 1. That the annual budget for the fiscal year 2024-2025 for the SCLAA be hereby amended to reflect a change in the amounts and associated accounts listed below and as described in the corresponding Agenda Item.

Account Amount Adjusted
4500125-55320-95144 Airport Operations Expense $211,530.17

SECTION 2. That copies of such amended budget, certified by the Authority Secretary, shall be filed with the auditors of the Southern California Logistics Airport Authority and in the office of the Authority Secretary for public inspection and certified copies thereof shall be made available for use by SCLAA, City departments, offices and subsidiary districts of the City.

ATTACHMENT C

Amendment One
Construction Agreement/Pave-Tech Inc./Project CC24-126/Amendment 1

Page 1 of 3 ends

AMENDMENT NUMBER: ONE
TO

CONSTRUCTION AGREEMENT

BY AND BETWEEN

THE SOUTHERN CALIFORNIA LOGISTICS AIRPORT AUTHORITY
AND
PAVE-TECH INC.

FOR
RUNWAY 17/35 RECONSTRUCTION PHASE V,
PROJECT NUMBER: CC24-126

THIS AMENDMENT (the “Amendment”) is made and entered into this ____ day of _______ 2024, by and between the Southern California Logistics Airport Authority , a joint powers authority, organized and existing in the County of San Bernardino under and by virtue of the laws of the State of California (hereinafter referred to as “SCLAA”), and Pave-Tech Inc., a California corporation, hereinafter referred to as “Contractor.” The SCLAA and Contractor are sometimes hereinafter referred to individually as a “Party” and collectively referred to as the “Parties”.

Recitals

1. WHEREAS, SCLAA has a Construction Agreement (hereinafter referred to as the “Original Agreement”) with the Contractor to provide Runway 17/35 Reconstruction Phase V, Project CC24-126; and

2. WHEREAS, it is the desire of the Parties to issue Amendment One (1) to the Original Agreement to amended Section 2. Contract Documents; Priority, Exhibit B, Bid Proposal Form; and Section 5., Compensation to Contractor; Manner of Payment, is amended to increase the total cumulative sum by $211,530.17; thereby revising the not to exceed sum from $4,933,549.27 to $5,145,079.44; and

3. NOW THEREFORE , in consideration of the covenants, conditions, and promises contained herein and for such other good and valuable consideration, receipt of which is hereby acknowledged, the Parties are willing to amend the Original Agreement as stated below.

Contract Amendment

Section 2. – CONTRACT DOCUMENTS; PRIORITY- is amended as follows:

“The Bid Proposal Price Schedules submitted to SCLAA by Contractor and attached as Exhibit “B” is hereby amended to include “Runway 17/35 Reconstruction Phase V – Amendment dated November 21, 2024, incorporated herein by this reference and attached as Exhibit “B-1”.

Construction Agreement/Pave-Tech Inc./Project CC24-126/Amendment 1

Page 2 of 3 ends

Section 5. – COMPENSATION TO CONTRACTOR; MANNER OF PAYMENT, SUBPARAGRAPH a. – is amended as follows:

“Subject to the provisions of Section 3 of this Contract and Section XVII of the Instructions to Bidders, CONTRACTOR agrees to accept the following as compensation for satisfactory completion of the work in accordance with the Contract Documents a total amount not to exceed Five Million One Hundred Forty-five Thousand Seventy-nine and 44/100 Dollars ($5,145,079.44), (the “Contract Amount”). See Exhibits “B” and “B-1”, Bid Proposal Price Schedules.

Except as amended herein, the terms and conditions of the Original Agreement and all previous amendments remain in full force and effect.

(SIGNATURES ON NEXT PAGE)

Construction Agreement/Pave-Tech Inc./Project CC24-126/Amendment 1

Page 3 of 3 ends

IN WITNESS WHEREOF, the parties hereto have caused the Amendment to the Original Agreement to be entered as of the dates written below.

PARTY OF THE FIRST PART PARTY OF THE SECOND PART

SOUTHERN CALIFORNIA LOGISTICS PAVE-TECH INC.

AIRPORT AUTHORITY

By: ______________________________ By: __________________________ Elizabeth Becerra, Rudy C. Zavalani,
Authority Chairman President

Dated: ___________________________ Dated: _______________________

ATTEST

By: ______________________________
Jennifer Thompson,
Authority Secretary

Dated: ___________________________

By: ______________________________
Sandra Bostick,
Authority Risk Manager

Dated: ___________________________

APPROVED AS TO STANDARD FORM

By: ______________________________
Andre de Bortnowsky,
Authority Legal Counsel

Dated: ___________________________

PROJECT CC24-126
RUNWAY 17/35 RECONSTRUCTION PHASE V -AMENDMENT
BREAKDOWN OF DIRECT COSTS DATE: 14 Nov 24

ITEMS OF WORK FOR QTY UNIT LABOR O EQUIPMENT
PAVE-TECH INC. ITEM OF WORK BREAKDOWN Unit Cost Total Cost Unit Cost Total Cost R Qty Rate Total

1. MICROMILL & REMOVAL OF EXISTIG STRIPING & GSB88 SEAL RUNWAY 03/21 860000 SF $0.00 $0.01 8,932.95$ 1 $2,889.35 $2,889.35

2. 2.

3. 4.

5. 6.

7. 8.

9. 10.
$0.00 8,932.95$ R
O Total $2,889.35

QTY UNIT MATERIALS LABOR O EQUIPMENT
Unit Cost Total Cost Unit Cost Total Cost
R Qty Rate Total

1. MICROMILL & REMOVAL OF EXISTIG STRIPING & GSB88 SEAL RUNWAY 03/21 860000 SF $0.22 $189,635.00 $0.00

2. 3. RESTRIPING OF AIRFIELD MARKINGS NOT INCLUDED

4. 5.

6. 7.

8. PAVE-TECH INC. SUBCONTRACTOR TOTALS $189,635.00 $0.00 Total (Owned) $0.00

9. 10. Total Pave-Tech Costs 11,822.30$

11. Total subcontractor Costs $189,635.00

12. Sub Total of Costs 201,457.30$

13. 5% MARK UP 10,072.87$

14. 211,530.17$

15. 16.

2.) RUNWAY 03/21 WILL BE SEALED USING GSB-88.

SUBCONTRACTOR ITEMS OF WORK

MATERIALS
Ben Gonzalez/ PROJECT MANAGER
NOTES:

1.) MICROMILLING WILL BE UTILIZED TO REMOVE THE EXISTING STRIPING

3.) RE-INSTALLATION (STRIPING) OF THE AIRFIELD MARKINGS IS NOT INCLUDED IN THE SCOPE OF WORK PRICED BY PAVE-TECH, STRIPING TO BE PERFORMED BY OTHERS.

PAVE-TECH INC.

PAVE-TECH INC. MICROMILL EXISTING STRIPING - GSB88 SEAL RUWNAY 03/21- FORCE ACCOUNT COST SUMMARY UPDATED 11/21/2024 ANY PREVIOUS VERSIONS ARE OBSOLETE
EXHIBIT B-1, AMENDMENT 1, BID PROPOSAL FORM

ATTACHMENT D

Pave-Tech Inc., Proposal

PROJECT CC24-126
RUNWAY 17/35 RECONSTRUCTION PHASE V -AMENDMENT
BREAKDOWN OF DIRECT COSTS DATE: 14 Nov 24

ITEMS OF WORK FOR QTY UNIT LABOR O EQUIPMENT
PAVE-TECH INC. ITEM OF WORK BREAKDOWN Unit Cost Total Cost Unit Cost Total Cost R Qty Rate Total

1. MICROMILL & REMOVAL OF EXISTIG STRIPING & GSB88 SEAL RUNWAY 03/21 860000 SF $0.00 $0.01 8,932.95$ 1 $2,889.35 $2,889.35

2. 2.

3. 4.

5. 6.

7. 8.

9. 10.
$0.00 8,932.95$ R
O Total $2,889.35

QTY UNIT MATERIALS LABOR O EQUIPMENT
Unit Cost Total Cost Unit Cost Total Cost
R Qty Rate Total

1. MICROMILL & REMOVAL OF EXISTIG STRIPING & GSB88 SEAL RUNWAY 03/21 860000 SF $0.22 $189,635.00 $0.00

2. 3. RESTRIPING OF AIRFIELD MARKINGS NOT INCLUDED

4. 5.

6. 7.

8. PAVE-TECH INC. SUBCONTRACTOR TOTALS $189,635.00 $0.00 Total (Owned) $0.00

9. 10. Total Pave-Tech Costs 11,822.30$

11. Total subcontractor Costs $189,635.00

12. Sub Total of Costs 201,457.30$

13. 5% MARK UP 10,072.87$

14. 211,530.17$

15. 16.

2.) RUNWAY 03/21 WILL BE SEALED USING GSB-88.

SUBCONTRACTOR ITEMS OF WORK

MATERIALS
Ben Gonzalez/ PROJECT MANAGER
NOTES:

1.) MICROMILLING WILL BE UTILIZED TO REMOVE THE EXISTING STRIPING

3.) RE-INSTALLATION (STRIPING) OF THE AIRFIELD MARKINGS IS NOT INCLUDED IN THE SCOPE OF WORK PRICED BY PAVE-TECH, STRIPING TO BE PERFORMED BY OTHERS.

PAVE-TECH INC.

PAVE-TECH INC. MICROMILL EXISTING STRIPING - GSB88 SEAL RUWNAY 03/21- FORCE ACCOUNT COST SUMMARY UPDATED 11/21/2024 ANY PREVIOUS VERSIONS ARE OBSOLETE

ATTACHMENT E