Cities Index.
Additional Documents

Victorville City Council
June 17, 2025

Document
Additional Documents
Meeting
June 17, 2025
Body
Victorville City Council
Original file
2.0 MB
Text extracted from the city's file for reading and search. Open the original on victorvilleca.primegov.com. That file is the official record.

SAN BERNARDINO COUNTY TRANSPORTATION AUTHORITY

MEASURE I

BY THE NUMBERS
Promises Made - Promises Kept
When the voters of San Bernardino County overwhelmingly approved the Measure extension in 2004, it came with a commitment by SBCTA to deliver on the promises of a better transportation system.

That promise has been kept as the agency
continues to offer more choices for
how we move to and through our
beautiful county.

Measure I has participated in the delivery of
$2.5 projects in a wide range of its programs, totaling $700M $2.9 billion, with Measure I contributing
Billion $682 million. Local
Improvements
generated for
projects and
programs
$2.9 More than $700 Million
has been returned to local
jurisdictions for projects like
Billion sidewalks, pothole repairs, and
improved signalization
Regional at intersections.

Infrastructure
Improvements A
Freeways
32,500
E
Grade Separations
Jobs Interchanges Double Track
Supported by Measure I* sb
* Statistic based on job impact numbers from
USDOT, and revenue generated by Measure I cta Take Transportion Transit since 2010.

San Bernardino County Transportation Authority
909.884.8276 www.goSBCTA.com
1170 W. Third Street, San Bernardino, CA 92410

VICTORVILLE
Measure l
Funded
Past, Present & Future Measure | Supported Projects in Victorville • Green Tree Extension
• Nisqualli / Interstate 15 Interchange Project
• Bear Valley Road Over BNSF Railroad Bridge Widening
• Roadway Improvements & Pavement Rehabilitations:

La Mesa Road (El Rio Rd to Cantina Dr)
Bear Valley Road (Dunia Rd to Amethyst Rd)
Bear Valley Road (Balsam Rd to Amargosa Rd)
- El Evado Road (Hook Blvd to Mojave Drive)
Village Drive (Mojave Dr to Air Expressway)
Third Ave (Nisqualli Rd to Green Tree Blvd)
Industrial Boulevard (Bear Valley Rd to Silica Rd)
Arrowhead Drive (Green Tree Blvd to Nisqualli Rd)
Seventh Ave (Nisqualli Rd to Bear Valley Rd) ROUTE 66
Amargosa Road (Village Dr to Placida Rd)
Amethyst Road (Mojave Dr to Bear Valley Road)
Bear Valley Road (Mariposa Rd to Amargosa Rd)
La Mesa Road (Cantina Rd to Mesa View Dr)
Nisqualli Road (Hesperia Rd to I-15)
Liberty Village
Herbert Street
Luna Road
Mountain View Acres
Square Mile
Civic Center
Golden Triangle Area
Green Tree East
• Safe Routes to Schools
• Seventh Street Desert Scape Upgrade
• Old Town Sidewalk Project
• Mojave Riverwalk
Guardrail Replacements (Various Locations)
• La Mesa Storm Drain Emergency Repair
• Eucalypts Stormdrain and Water Line Project
• Traffic Signal Installation and Safety Improvements
• Local Roadway Safety Plan
sb MEASURE I

← All documents from this meeting