ATTACHMENT B -

CIVILTEC ENGINEERING,
INC. COST PROPOSAL

Civil, Water, Wastewater, Drainage and Transportation Engineering Construction Management ● Surveying
California ● Arizona

605 E. Huntington Drive, Suite 205, Monrovia, CA 91016 | P: 626.357.0588 October 8, 2025

City of Victorville
Victorville Water District
14343 Civic Drive
Victorville, CA 92393

Subject: Budget Amendment #3 – Turnout No. 5 Amethyst Road Water Pipeline and Metering Facility

To: Victor Fajardo, P.E.

Civiltec would like to present Budget Amendment 3 that requests a budget amendment for the subject project. Additional services are required to provide continued support that includes revisions to the plans and specifications regarding comments made by Mojave Water Agency (MWA) for the pipeline and metering facility , a minor amendment to the streambed alteration agreement, and revisions to the Revegetation and Restoration Plan to comply with CDFW requirements for final approval. Additional services include a supplemental survey, revisions to deepen the pipeline, addition of cathodic protection details and specifications, and various changes to the electrical, controls, and communications design at the metering facility at the request of MWA. A scour study was also requested by MWA to be performed across the Oro Grande Wash where the pipeline will cross.

A breakdown of budget is included below.

Table 1: Proposed Budget
Engineering Services Budget
PHASE 1 – Final Design
Task 1. Final Plan, Specs & Estimates $55,000.00
PHASE 2 – Environmental Services
Task 2. Revision for Environmental Permitting $15,000.00 Task 5. Scour Study $13,225.00
TOTAL $83,225.00

The contract amount is revised as follows:

• Original Contract Amount: $176,318.40
• Budget Amendment #1: $75,250.00
• Budget Amendment #2: $45,000.00
• Budget Amendment #3: $83,225.00
• Revised Contract Amount: $379,793.40

Victor Fajardo, P.E.

Turnout No. 5 Amethyst Road Water Pipeline and Metering Facility October 8, 2025
2 of 2
Please contact the undersigned directly with any questions.

Sincerely,

CIVILTEC engineering, inc.

David Song, P.E.

Principal Engineer, Branch Manager