SUBJECT: Change Order One - Hook Community Center Flooring Installation- Project CC26-061
Summary:
Approval is requested for a construction change order associated with the Hook Community Center Flooring Installation, Project CC26-061. The City of Victorville entered into a construction agreement with Lawrence W. Rosine Co. for the Hook Community Center Flooring Installation in the amount of $40,700.00, which includes removal of existing flooring and installation of new flooring materials meeting City standards.
During construction, unforeseen site conditions were identified that require additional work beyond the original contract scope to ensure proper flooring installation and long-term performance. This additional work is also necessary to maintain compliance with the manufacturer's ten (10) year warranty.
As part of standard flooring installation procedure, the contractor conducted moisture testing of the existing concrete substrate. Test results indicated elevated moisture levels exceeding acceptable tolerances for the specified flooring materials. This condition was not visible or reasonably identifiable prior to demolition and was discovered only after the substrate was exposed.
To properly address the elevated moisture condition, a moisture mitigation system must be applied. This requires additional work beyond the original contract scope, including moisture mitigation treatment, additional materials and labor, and extended preparation and curing time.
This condition must be addressed to avoid moisture rising from the concrete substrate causing issues such as mold, mildew, tile cupping, and adhesive failure. Although the vinyl tiles themselves are waterproof, moisture trapped in the porous concrete below may still cause these problems. Additionally, the manufacturer cannot honor the ten (10) year warranty, unless the moisture issue is properly mitigated to manufacturer's specification.
Fiscal Impact:
The cost for proposed Change Order 1 is $36,217.74, which includes labor and material to install the epoxy moisture barrier to 5800 square feet of substrate. This brings the project total to $76,917.74. Funding for this change order will be provided from Account No. 105611-55060- 80104. As the original bid was well under budget, sufficient funds are available to cover this expense.
Procurement Process:
The original Hook Community Center Flooring Installation contract was procured in accordance with the City of Victorville's informal bidding procedures and executed following Deputy City Manager approval. This change order does not modify the original procurement method or contractor selection and is limited solely to additional work required due to unforeseen site conditions encountered during construction.
Signing Authority:
Victorville Municipal Code Section 2.28.1 S0(b) - Construction Contract Change Orders states, Provided the funding for the public works project contract has been previously approved and the expenditure of funds authorized by the city council, the city manager shall have the authority to execute change orders; provided however, that if a single contract change order ( or the cumulative amount of change orders on a given public project) exceeds fifteen percent of the total contract price or two hundred thousand dollars (whichever amount is less), the city manager shall obtain city council approval prior to executing the change order. lo emergency situations where stopping the work will result in severe repair or replacement delays and subject the city to additional excessive costs due to project delay, the City Manager is authorized to approve a change order that exceeds these limits. In this instance, the existing flooring has been removed as part of construction activities, leaving exposed substrate areas that constitute a tripping hazard and present an immediate safety concern. Pending City Manager approval, the change order will be presented to the City Council at the January 20, 2026, City Council meeting for ratification.
To ensure the safety of patrons during construction, the Hook Community Center is temporarily closed, which impacts preschool and basketball programming. To avoid further postponement of these programs, staff request that Change Order No. 1 be approved pursuant to the emergency conditions set forth in Victorville Municipal Code Section 2.28.1 S0(b).
Please route the above referenced document as follows:
D Signatures needed by the following:
D Mayor/Chairman
[g]
[g]
□ □
□ □
□
City Manager
Deputy City Manager
Legal Counsel
Risk Manager
City Clerk
Notarization Required
Recordation Required
City Manager Approval:
Deputy City Manager Review:
?�� s:::
D This item was presented to the City Council/Board of Directors at the meeting of _____ . (Attach staff report for reference)
Strategic Plan Goal E: Invest in Infrastructure: This project supports infrastructure investment by replacing aging systems that help maintain essential City operations Departmen
�
Recommendation: I have reviewed the subject item and recommend approval.
� Memo prepared by Daysi Oxley and returned to Daysi Oxley. [g] This item is an urgent item for the following reason: to keep the project on schedule.
Item needs to be completed by as soon as possible.
Attachments
• Attachment A- Moisture Test Results / Contractor Documentation • Attachment B -Change Order 1
• Attachment C - Facilities Account Inquiry
Attachment A
Moisture Test Results/ Contractor Documentation
Moisture and pH Test Report
I Client Name: I City of Victorville
Hook Community Center
Address: 14973 Joshua St, Victorville, CA 92394
Name of Tester: I Andrew Rosine I Date of Test: j 11212025 I Type of Subfloor I Wood D I Concrete IZ]
I Tester Make/Model/Serial#
Date of Tester Calibration: 12/31/2024
Test Location 1 2 3
Sensor Number L622076112 L622076125 L622076498
Depth 2.4" 2.4" 2.4"
Time of Test Setting 11 :30am 11:30am 11 :45am
Time of Test Read 12:30pm 12:30pm 12:30pm
RH % in Subfloor 96% 88% 99%
Temp of Concrete 66° 67°
69°
Ambient Air Temp 66° 72° 68°
pH reading 10 10 10
4 5 6
L622076203 L622076395
2.4" 2.4"
11 :45am 12pm
12:30pm 12:30pm
90% 99%
69° 73°
72 ° 74°
10 10
7 Tested by: !Andrew Rosine I Company: I Lawrence W. Rosine Co.
Moisture meets requirement of AS 1884 - 2012 Floor Coverings - Resilient sheet and tiles - Installation practices
Test#2
,, ...
Serial#: L622076125
Test Result: 880/o RH
.i
< L�r:-�tffe-1�:-=-i:l ·1
·.: I· I ·1 � 1· .. '
-· ··•······1··
l _j'•• ,, I •, I �' • !'
,,.� •Jtll•il'-j t
1:==D I. i• ••• • ·/'
' ··•. .,. • t 0• 1 < � • • : ,·1·
,·i .. [:�1 1· I .!·- r··· : • ••
··-- ,� i -::.=. i.: -i·l· ··:v-�J, ._:i-.•·
Test#3
Serial #: L622076498
Test Result: 99% RH
%'�01i �� r- a, Ol
'.'iit�I sg.: !1 �
�ft]
rial #: L6220
est Result: 99
076203
Attachment B
Change Order 1
Lawrence W. Rosine Co.
8640 Red Oak St. Rancho Cucamonga 91730
Office: 626-962-4915
Date: 1/4/2025 Contractor: City of Victorville
Attention: Eddie Gleason
LWRRFC#:
Project: Hook Communtiy Center
Victorville, CA
Materials
Labor
15 pails Koster UFS 2-Part Epoxy Moisture Barrier $
5 units Koster 06 Primer $
Tax
Material subtotal
312 Journeyman Regular Time Hourly $
Labor Total
Subcontractor
Iota.ls
Material+Labor Total
Subcontractor Total
Overhead/Profit
$
Sub-Teir Overhead/Profit
15%
5%
Total
TOTAL CHANGE ORDER
Inclusions:
375.00
225.00
77.63 $
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
I$
5,625.00
1,125.00
523.13
7,273.13
24,220.56
24,220.56
31,493.69
4,724.05
36,217.74
36,217.741
Added cost to furnish and install Koster UFS 2-part epoxy moisture barrier due to excess RH readings.
Accepted: ---------------
51 g n tu a rn,
�� I= 1 e
Date: ::;i • • ,.., 9 ��t,,
Lawrence W. Rosine Co.
By: Andrew Rosine
Email: A. .... d,eW@lwrosineco com
CA UC. 173235
Attachment C
Facilities Account Inquiry
•f:•. Account Inquiry {CITY OF VICTORVILLEJ..
X
-
0..
-
Ill ffi
:::- �
!\cco1mt n:mil'll 'C '""' OFVICTORVl'llE
J\,::count
�11nd :os
8 -
MWP
0 lloW
Ill
:re•
.A.cc!
ill
s. ..
°" :056110 MSRP+«>Of: AcetNrn•
Clljffl ,,oe� 11.0Gllt,IP Typs.
Prv� i11l104 (:J '!OOiC fl.®ll'tlG QS>l.,f: �n.,•
Sub-Rol!ouF
... © •
- - - /4f/la'
105-60-60-{)050-61 1C-55060-80-104
!IUIU)lHOS & Bl.I l.OIHG ltlPfMl!fTS ---
,£1p•r.11 ll11t.a
[fil
[fil
'i•.
. \ - •-
At
-- ---· Ulllt:)lf!lal
-
[ CJ Ac-coHt kDlH
4 Yea, C ■rllOII Curr.nt Yur MiltOfJ 4 VHr Graph Hl11ory Or1ph Yr�:l02S.t'.li
Orig,,,al 8..dgl!'.t
;,.-llfmi-.
T�OI.(
:Ro:wised El""9<rt
� (t.fes'no)
-�
!f:lwqu,sitlll!IS
J:y-,c.1!,111
P..-cat1 used
f:::"iscai y_. 2025
.D, �
-!I�
:t)O �
.DO
oa [!]
.00 [!]
.00 [!]
.DO
.DO
f:'ISCIIIY....,21k24 !'iscalYHt:20�
.00 � -!'�. �
�� 00 ___ -�:c· 00.�o oo .oc, �
00 .00
a� 00 .oo 00
� 00 .co 00
00 .00
00 .00
,i:isca/Yur 2026
100.,.!)?0:_� 00
-�·�_____ __:..oo::...
,[�J
100.000.00
2,,566.00@
.00 �
.oo�
.,
97,£3.UO
2.57 -lf O, 700, oc 01-, c., {\J � �
1 f>lP1 13Y 'e t.M.,,._ \ ...J \ N Ca
C..c:>...l �'