Revision to Agenda Item #4
• Revised Exhibit A to Resolution No. 26-002 due to agenda management software platform improperly converting document and altering formatting
o Annual Development Impact Fee Report
 Section 2 – Current Impact Fees & Capacity Charges
• Bullet points have been reformatted to correctly
display on the document.
 Section 2.2 – Current Fee Schedule
• Bullet points have been reformatted to correctly
display on the document.
 Table 2 – Financial Summary Fiscal Year 2025
• The data on the table has been reformatted to
correctly display on the document.
 Table 3 – Public Improvements Fiscal Year 2025
• The data on the table has been reformatted to
correctly display on the document.
 Table 7 – Fiscal Year 2025 Interfund Loan Statuses
• The data on the table has been reformatted to
correctly display on the document.

Former Section 2:

Revised Section 2:

Former Section 2.2:

Revised Section 2.2:

Former Table 2:

Revised Table 2:

Former Table 3:

Revised Table 3:

Former Table 7:

Revised Table 7:

Attachment A
Resolution No. 26-002

RESOLUTION NO. 26-002

A RESOLUTION OF THE CITY COUNCI L OF THE CITY OF VICTORVILLE, CALIFORNIA, APPROVING THE ANNUAL AB 1600 DEVELOPMENT IMPACT FEE REPORT FOR FISCAL YEAR 2024-2025

WHEREAS, in 1987 the California State Legi slature adopted AB 1600 which established Government Code § 66000-66025 (the “Mitigation Fee Act”, which has been subsequently amended) establishing a proc ess by which local agencies may impose development impact fees and capacity charges on new development to finance various public improvements to mitigate the impacts of new development; and

WHEREAS, pursuant to the Mitigation Fee Act, the City Council of the City of Victorville (“City Council”) adopted Ordinance No. 1031 (as subsequently amended and currently codified in Victorville Municipa l Code Section 16-5.01.080) which established the authority to impose Deve lopment Impact Fees (“ DIF”) and Capacity Charges for Sewer and Water Improvements (“Capacity Charge(s)”) on new developments within the City to mitigate the impacts of development upon public infrastructure and various public facilities; and

WHEREAS, Government Code Sections 66006(a) and 66013(c) require all local agencies that collect DIF and Capacity Charges to deposit the fees into separate capital facility accounts in a manner that avoids commingling of DIF and Capacity Charges collected with other funds of the local agency; and

WHEREAS, Government Code Sections 66006( b)(1) and 66013(d) require all local agencies that collect DIF and Capacity Charges to make available for public review a report specifying information about the DIF and Capacity Charge accounts, including but not limited to the amount of fees/charges, the amount co llected each year, a list of expenditures from the account, and the beginning and ending balances in each account, within 180 days after the last day of each fiscal year (the “AB 1600 Report”); and

WHEREAS, the City of Victorville (“City”) hired NBS Government Finance Group to prepare the AB 1600 Report for Fiscal Year 2024-2025, attached hereto as Exhibit A, which substantially contains the information required by Government Code Sections 66006(b)(1) and 66013(d) and has been made available for public review.

NOW, THEREFORE, THE CITY COUNCI L OF THE CITY OF VICTORVILLE DOES HEREBY RESOLVE AS FOLLOWS.

SECTION 1. The recitals set forth above are true and correct and are incorporated into this Resolution by reference together with any definitions set forth therein.

SECTION 2. The City Council has conducted a public meeting, pursuant to Government Code Section 66006(b)(2), to review the AB 1600 Report for Fiscal Year 2024-2025, attached hereto as Exhibit A, and incorporated herein by this reference.

SECTION 3. Upon review of the AB 1600 Report for Fiscal Year 2024-2025, the City Council finds that the report contains the information required by Government Code Sections 66006(b)(1) and 66013( d) and outlines the required findings relative to Government Code Section 66001(d)(1), which are incorporated herein by this reference.

SECTION 4. That this Resolution shall take effect immediately upon its adoption.

SECTION 5. The City Clerk shall certify to the pa ssage an adoption of this Resolution; shall enter the same in the book of original resolutions; and shall make a minute of passage and adoption thereof in the records of the proceedings , in the minutes of the meeting at which this Resolution is passed and adopted.

Exhibit A

Annual Development Impact Fee Report
Fiscal Year Ended June 30, 2025

December 16, 202 5

Prepared by:

NBS
for the

CITY OF VICTORVILLE

City of Victorville

City Officials
Elizabeth Becerra, Mayor, District 3
Bob Harriman, Mayor Pro Tem, District 4
Tiffany Gaudin, Council Member, District 1
Leslie Irving, Council Member, District 5
Corrine Mora, Council Member, District 2

Officers
Jennifer Thompson, City Clerk

Administrative Team
Keith Metzler, City Manager
Tony Camargo, Deputy City Manager
Jenele Davidson, Deputy City Manager
Scott Webb, Deputy City Manager
Andre De Bortnowsky, City Attorney
Carmen Cun, Director of Finance/City Treasurer

TABLE OF CONTENTS

1.1 Annual Report ................................. ................................................................................................................................................. 1

1.2 Five-Year Report .............................. ................................................................................................................................................. 2

2.1 Types of Impact Fees, Capacity Charges and Asso ciated Funds ...................................................................................................... 4

2.2 Current Fee Schedule .......................... ............................................................................................................................................. 6

Attachment 1 – Residential Development Impact Fee Schedule in effect between July 1, 2024, and December 31, 2024.

Attachment 2 – Residential Development Impact Fee Schedule in effect between January 1, 2025, and June 30, 2025.

Attachment 3 – Non-Residential Development Impact Fee Schedule in effect between July 1, 2024, and February 28, 2025.

Attachment 4 – Non-Residential Development Impact Fee Schedule in effect between March 1, 2025, and June 30, 2025.

City of Victorville 1
Annual Development Impact Fee Report
Prepared by NBS

DEVELOPMENT IMPACT FEE REPORT
The California Mitigation Fee Act (Government Code Sections 66000 et seq.) mandates procedures for administration of impact fee programs, including collection and accounting, reporting, and refunds. Regarding reporting requirements, the Mitigation Fee Act (MFA) requires annual reporting for each impact fee fund, and a separate five-year reporting process. This report meets the requirements described in 1.1 Annual Report, below. A combined Annual and Five-Year Report was completed in 2021 and will next be provided in 2026.

1.1 Annual Report
Section 66006 (b) (1) requires that once each year, within 180 days of the close of the fiscal year, the local agency must make available to the public the following information for each separate account established to receive impact fee revenues:

1. A brief description of the type of fee in the account or fund; (report section 2)

2. The amount of the fee; (report section 2 and attachment)

3. The beginning and ending balance of the account or fund; (report section 3)

4. The amount of the fees collected and interest earned; (report section 3)

5. Identification of each public improvement on which fees were expended and the amount of the expenditures on each improvement, including the total percentage of the cost of the public improvement that was funded with fees; (report section 4)

6. Identification of the approximate date by which the construction of a public improvement will commence, if the City determines sufficient funds have been collected to complete financing of an incomplete public improvement; An identification of each public improvement identified in a previous report and whether construction began on the approximate date noted in the previous report. For a project identified for which construction did not commence by the approximate date provided in the previous report, the reason for the delay and a revised approximate date that the local agency will commence construction . (report section 4)

7. A description of each inter-fund transfer or loan made from the account or fund, including interest rates, repayment dates, and a description of the improvement on which the transfer or loan will be expended; (report section 5)

8. The amount of any refunds or allocations made pursuant to Section 66001, paragraphs (e) and (f). (report section 6)

The annual report must be reviewed by the City Council at its next regularly scheduled public meeting, but not less than 15 days after the statements are made public, per Section 66006 (b) (2).

City of Victorville 2
Annual Development Impact Fee Report
Prepared by NBS
Section 66013(d) has similar requirements for capacity charges in that, within 180 days after the close of each fiscal year, the local agency must make available to the public the following information:

1. A description of the charges deposited in the fund; ( report section 2)

2. The beginning and ending balance of the fund and the interest earned from investment of moneys in the fund; ( report section 3 )

3. The amount of charges collected in that fiscal year; (report section 3)

4. An identification of:
a. Each public improvement on which charges were expended and the amount of expenditure for each improvement, including the percentage of the total cost of the public improvement that was funded with those charges if more than one source of funding was used; (report section 4)
b. Each public improvement on which charges were expended that was completed during that fiscal year; (report section 4) c. Each public improvement that is anticipated to be undertaken in the following fiscal year; (report section 4)

5. A description of each interfund transfer or loan made from the capital facilities fund, including the public improvement on which the transferred or loaned charges are or will be expended and, in the case of an interfund loan, the date on which the loan will be repaid and the rate of interest that the fund will receive on the loan. (report section 5)

1.2 Five-Year Report
Prior to 1996, The Mitigation Fee Act required that a local agency collecting impact fees was required to expend or commit impact fee revenue within five years or make findings to justify a continued need for the money, otherwise those funds had to be refunded. SB 1693, adopted in 1996 as an amendment to the Mitigation Fee Act, changed that requirement in material ways.

Now, Section 66001 (d) requires that, for the fifth fiscal year following the first deposit of any impact fee revenue into an account or fund as required by Section 66006 (b), and every five years thereafter, the local agency shall make all of the following findings for any fee revenue that remains unexpended, whether committed or uncommitted:

1. Identify the purpose to which the fee will be put;

2. Demonstrate the reasonable relationship between the fee and the purpose for which it is charged;

3. Identify all sources and amounts of funding anticipated to complete financing of incomplete improvements for which impact fees are to be used;

City of Victorville 3
Annual Development Impact Fee Report
Prepared by NBS

4. Designate the approximate dates on which the funding necessary to complete financing of those improvements will be deposited into the appropriate account or fund.

Those findings are to be made in conjunction with the annual reports discussed above. If such findings are not made as required by Section 66001, the local agency could be required to refund the moneys in the account or fund, per Section 66001 (d).

Once the agency determines that sufficient funds have been collected to complete financing on incomplete improvements for which impact fee revenue is to be used, it must, within 180 days of that determination, identify an approximate date by which construction of the public improvement will be commenced (Section 66001 (e)). If the agency fails to comply with that requirement, it must refund impact fee revenue in the account according to procedures specified in Section 66001 (d).

City of Victorville 4
Annual Development Impact Fee Report
Prepared by NBS

CURRENT IMPACT FEES & CAPACITY CHARGES
Development impact fees (DIFs) in the City of Victorville are one-time charges levied on new development in Victorville to fund various infrastructure, facilities, vehicles, and equipment. The basis for these impact fees is presented in several development impact fee study reports:
 Development Impact Fee Justification Study, Regional Drainage Facilities, (Drainage DIF Report), competed by DTA on May 9, 2022 and adopted by City Council June 7, 2022.
 Development Impact Fee Study, Final Report (NBS DIF Report) completed by NBS on May 6, 2022. Fees documented in the DIF Report were adopted by City Council on June 7, 2022.

2.1 Types of Impact Fees, Capacity Charges and Associated Funds The fees documented in the body of this Annual Development Impact Fee Report (Report) include the following fees listed below. The revenue and expenditures for each fee type is tracked by the City in a separate fund.

Table 1. Impact Fees and Impact Fee Funds
Fund No. Facility Fee Name Purpose and Use of the Fee
350 Public Buildings
The purpose of the Public Buildings Impact Fee is to mitigate the impact of new development on the need for public buildings and general government vehicles and equipment in Victorville. Impact fees will be used to provide additional public buildings, vehicles, and equipment to mitigate the impact of new development on the need for those facilities in the City. 351 Fire Safety
The purpose of Fire Protection Facilities Impact Fee is to mitigate the impact of new development on the need for fire facilities provided by the City of Victorville. Impact fees will be used to provide additional fire facilities to mitigate the impact of new development on the need for those facilities in the City.

City of Victorville 5
Annual Development Impact Fee Report
Prepared by NBS
Fund No. Facility Fee Name Purpose and Use of the Fee
352 Roads
The purpose of the Road Improvements Impact Fee is to mitigate the impact of new development on the need for road, bridge, interchange and traffic signal improvements in Victorville. Impact fees calculated in this chapter will be used to provide additional road, bridge, interchange and traffic signal improvements to mitigate the impact of new development on the need for those facilities in the City. The list of eligible improvement projects for roadway projects is included in Table 9.1 of the NBS DIF Report.

Note funds 355 and 356, are reported as combined with Fund 352. The purpose of the Fund 355 Nisqualli impact fee is to mitigate the impact of new development within an area served by the I-15 / Nisqualli Rd. / La Mesa Rd. Interchange. Impact fees have been and will be used to pay for the interchange improvements. The purpose of the Fund 356 Goodwill impact fee is to mitigate the impact of new development within an area served by the Goodwill (I-15 / Roy Rogers) Interchange.

Impact fees have been and will be used to pay for the interchange improvements. 353 Police
The purpose of Police Facilities Impact Fee is to mitigate the impact of new development on the need for police facilities in Victorville. Impact fee funding will be used to provide additional police facilities to mitigate the impact of new development on the need for those facilities in the City. 354 Parks and Recreation
The purpose of the Parks and Recreation Facilities Impact Fee is to mitigate the impact of new development on the need for parks and recreation facilities in Victorville. Fee revenues will be used to fund additional parks and recreation facilities to mitigate the impacts of new development in the City.
357 Storm Drainage
The purpose of the Storm Drainage Impact Fee is to ensure that all new development pays its fair share of cost of new infrastructure. Impact fee funds will finance new development’s share of future drainage facilities to meet the demands of new development in the City through 2050. The list of eligible improvement projects for storm drainage impact fee funding is included in Appendix A of the Drainage DIF Report.

City of Victorville 6
Annual Development Impact Fee Report
Prepared by NBS
Fund No. Facility Fee Name Purpose and Use of the Fee
414 and 415 Water System Improvements
Water Capacity Charges are one-time charges to new development connecting to the City of Victorville/Victorville Water District’s water system. System improvements include water distribution pipelines, additional operational and emergency reservoir storage and additional ground water wells. The list of eligible improvement projects for water capacity fee funding is included in Tables 8.1 and 8.4 of the NBS DIF Report.

A component of the Water Capacity Charges also includes the cost of acquiring rights to additional ground water or alternative sources of supply. The water rights component of the overall water system capacity charge will be used to acquire additional ground water rights, or to purchase permanent supplemental water if ground water rights are not available. Revenues may also be used for projects and technology that would provide permanent supplemental water to the basin in lieu of ground water rights.
416 Sewer
The purpose of the sewer capacity charge is to fund the new connections attributable to the impact from new development. Sewer Capacity Charges are one-time charges to new development or existing development first connecting to the City of Victorville’s sewer system. The list of eligible planned capital projects funded by sewer capacity charges is shown in the NBS DIF Report, Appendix D, Figure 6.

2.2 Current Fee Schedule
During Fiscal Year 2021-22, the Victorville City Council (Council) adopted Resolutions 22-045 and VWD 22-005, which adopted a Development Impact Fee Study (Nexus Study). On June 7, 2022, Council adopted Resolutions 22-050 and VWD 22-007, which adopted an updated Master Fee Schedule (MFS), and a phased in approach to update fees to the full amounts identified in the Nexus Study.

On December 19, 2023, the Council adopted updated Non-Residential Development Impact Fees via Resolutions 23-100 and VWD 23-015, which went into effect on March 1, 2024. On December 17, 2024, the Council adopted updated Non-Residential Development Impact Fees via Resolutions 24-005 and VWD 24-011, which went into effect on March 1, 2025.  Attachment 1 – Residential Development Impact Fee Schedule in effect between July 1, 2024, and December 31, 2024.  Attachment 2 – Residential Development Impact Fee Schedule in effect between January 1, 2025, and June 30, 2025.  Attachment 3 – Non-Residential Development Impact Fee Schedule in effect between July 1, 2024, and February 28, 2025.  Attachment 4 – Non-Residential Development Impact Fee Schedule in effect between March 1, 2025, and June 30, 2025.

City of Victorville 7
Annual Development Impact Fee Report
Prepared by NBS

FINANCIAL SUMMARY REPORT
The following financial summary provides an annual statement of revenues, and changes in fund balance for each impact fee fund, for the Fiscal Year End June 30, 2025. Figures shown in the table below are unaudited as of the date of this report.

Table 2. Financial Summary Fiscal Year 2025

Fund No. 350 351 352, 355, 356 353 354 357 414, 415 416 Description
Public
Buildings Fire Safety Roads Police
Parks and
Recreation Storm Drain Water Sewer

REVENUES
Fees 433,149 86,886 1,476,928 62,157 1,039,834 1,721,086 473,094 832,400 Interest 13,860 32,958 256,609 49,929 860,473 158,296 416,613 232,928 Total Revenues 447,010 119,844 1,733,537 112,086 1,900,306 1,879,383 889,707 1,065,328 Fund Balance, Beginning of the Year 1 (16,998,689) 679,152 12,071,486 1 ,990,506 22,174,313 5,644,171 25,07 5,693 4,649,224 Fund Balance, End of the Year 1
(17,209,683) 798,996 13,701,282 2 ,102,592 23,947,088 7,523,554 25,96 5,400 5,714,552 1 Beginning & Ending Fund Balance per financial reports provided by the City's Finance Department.

City of Victorville 8
Annual Development Impact Fee Report
Prepared by NBS

PUBLIC IMPROVEMENTS
Current Year Expenditures: This section of the Annual Report identifies each public improvement on which fees were expended as of Fiscal Year End, June 30, 2025. Per the MFA requirements, information regarding the amount of the expenditures on each improvement is also provided, including the percentage of the cost of the public improvement that was funded with fees.

Table 3. Public Improvements Fiscal Year 2025

Planned Expenditures: Government Code Section 66006 (b)(1)(F)(i) also requires identification of the approximate date by which construction of a public improvement will commence, if the City determines sufficient funds have been collected to complete financing of an incomplete public improvement.

According to the City’s FY 2025 Development Impact Fee & Capacity Fee Capital Improvement Plan , funds are committed to complete financing of various public improvements as shown in the table below. Each project is identified by impact fee fund, and shows an approximate start date:

Table 4: Planned Public Improvements

Fund Fund
Name Proj. # Project Name Project
Start
Project
Finish
Project
Phase
Total Project
Funding
Total Impact Fee
Funded Amount
% Impact Fee
Funded
Total Prior Year
Impact Fee
Expenditures
FY 2025 Impact
Fee
Expenditures
Impact Fee
Funding
Remaining
352 Road 60005 NISQ/I15 INTERCHANGE-ST CONST Ongoing Ongoing Active 48,860,904 $ 22,762,803 $ 47% 22,805,593 $ 41,243 $ (84,033) $ 352 Road 60013 Green Tree Blvd Extension FY 2021/22 FY 2023/24 Completed 44,014,999 $ 18,863,905 $ 43% 15,847,209 $ 2,460 $ 3,014,237 $ 352 Road 60014 Bear Valley Road Bridge over BNSF Railway FY 2020/21 FY 2025/26 Active 27,222,085 $ 5,582,343 $ 21% 5,043,141 $ 13,318 $ 525,884 $ 352 Road 62064 Seventh Street Traffic Signal Modifica tions FY 2024/25 FY 2025/26 Active 3,659,728 $ 43,716 $ 1% - $ 32,600 $ 11,116 $ 352 Road NA Local Traffic Signal Improvements Ongoing Ongoing Active 1,320,582 $ 1,320,582 $ 100% 39,641 $ 14,121 $ 1,266,819 $ 354 Parks 81034 Eagle Ranch Restroom FY 2025/26 FY 2025/26 Active 350,000 $ 350,000 $ 100% 917 $ -$ 349,083 $ 354 Parks 80058 Hook Track Lighting FY 2022/23 FY 2025/ 26 Active 605,427 $ 605,427 $ 100% 445,690 $ 127,532 $ 32,205 $ 414 Water 74459 Permenant Water Rights Ongoing Ongoing Active 10,100,000 $ 3,254,798 $ 32% 2,621,972 $ 632,826 $ 0$ 136,133,725 $ 52,783,574 $ 46,804,164 $ 86 4,099 $ 5,115,311 $ Development Impact Fees
TOTAL
Fund Fund
Name Proj. # Project Name Estimated
Project Start
352 Road 60146 Bear Valley Bridge Widening FY 2025/26
353 Police
354 Parks
354 Parks 81003 Doris Davies BEARS Den Remodel FY 2027 /28 354 Parks 81059 Westside Dog Park FY 2026/27
50023 Civic Plaza Park & Police Station FY 2025/26
C
ity of Victorville 9
Annual Development Impact Fee Report
Prepared by NBS
Prior Year Reported Public Improvements: The following are public improvements identified in the City’s prior impact fee fund report: Annual Development Impact Fee Report – Fiscal Year Ended June 30, 2024 dated December 20 ,2024. The table notes the estimated start date for each project, and whether construction began on the approximate date noted in the previous report. For any project identified for which construction did not commence by the approximate date provided in the previous report, the reason for the delay is noted as well as a revised approximate date that the City will commence construction.

Table 5: Prior Year Reported Public Improvements
Fund Fund
Name Proj. # Project Name
Estimated
Project
Start
Project
Phase Reason for Delay
Revised
Estimated
Project Start
354 Parks 81032 Sports Complex Feasibility Study FY 2022 /23 Not Started At this time, the City is in the process of identify ing the location for the Sports Complex. Once the location has been identified and the land has been acquired, the City will move forward with this project.

FY 2026/27
354 Parks 81004 Eva Dell Dog Park FY 2022/23 Not Started This is a component of a larger park project that ha s grant funding. The project has expenditures for the pre-construction phase that has been fully covered by the grant. The DIF funds will be utilized once construction begins.

FY 2026/27
3 54 Parks 81006 New Rectangle Fields FY 2022/23 Not Started At this time, the City is in the process of acquirin g the site for the sports complex. Once site acquisition takes place, the City will move forward with this project.

FY 2026/27
354 Parks 81008 New Walking Path FY 2024/25 Not Started This is a component of a larger park project that ha s grant funding. The project has expenditures for the pre-construction phase that has been fully covered by the grant. The DIF funds will be utilized once construction begins.

FY 2026/27
354 Parks Trails Master Plan FY 2025/26 Not Started
The City has prioritized the development of smaller walking path projects at various parks throughout the City to achieve more immediate results. Once these smaller walking paths have been completed, the City will move forward with this project.

FY 2026/27

City of Victorville 10
Annual Development Impact Fee Report
Prepared by NBS
Government Section 66013(d) has similar requirements for water and wastewater capacity charges to identify each public improvement that is anticipated to be undertaken in the following fiscal year.

Table 6. Planned Water and Wastewater Public Improvements

Fund Fund
Name Proj. # Project Name Estimated
Project Start
414 Water 74338 Pipeline - Area 28 - MWA Turnout #5 FY 2025/26 414 Water 74373 1M Gallon Water Tank FY 2025/26

City of Victorville 11
Annual Development Impact Fee Report
Prepared by NBS

INTERFUND LOANS
The Mitigation Fee Act requires a description of each inter-fund transfer or loan made from the account or fund, including interest rates, repayment dates, and a description of the improvement on which the transfer or loan will be expended.

There were no new interfund transfers or loans made between impact fee funds in Fiscal Year 2025. The following table summarizes all active interfund loans to and/or from the City’s impact fee funds.

Table 7. Fiscal Year 2025 Interfund Loan Statuses

Date of Loan Maturity Date Purpose of Loan
Original
Advance
Balance
06/30/2025
Interest
Rate 1
06/30/11 06/30/26 City Hall Expansion Project #98005 7 ,725,000 $ 352 Roads 350 Public Buildings 7,328,65 7 $ 1.37% 06/30/11 06/30/26 City Hall Expansion Project #98005 1 ,150,000 $ 353 Public Safety 350 Public Buildings 1,090,997 $ 1.37% 06/30/11 06/30/26 City Hall Expansion Project #98005 4 ,375,000 $ 354 Recreation 350 Public Buildings 4,1 50,534 $ 1.37% 06/30/11 06/30/26 City Hall Expansion Project #98005 5 70,000 $ 352 Roads 350 Public Buildings 297,04 8 $ 1.37% 06/30/11 06/30/26 City Hall Expansion Project #98005 9 20,000 $ 352 Roads 350 Public Buildings 872,79 8 $ 1.37% 06/30/11 06/30/26 City Hall Expansion Project #98005 3 ,675,000 $ 357 Storm Drain DIF 350 Public Buildin gs 3,486,448 $ 1.37% 1 Interest Rates are Average and/or Fixed 5-year LAIF rate Lender Borrower

City of Victorville 12
Annual Development Impact Fee Report
Prepared by NBS

REFUNDS
The refunding requirements for the Mitigation Fee Act are summarized as follows:

Refunds under the Mitigation Fee Act: If the City determines that sufficient funds have been collected to complete financing on incomplete improvements for which impact fee revenue is to be used, it must, within 180 days of that determination, identify an approximate date by which construction of the public improvement will be commenced (Government Code Section 66001 (e)). If the agency fails to comply with that requirement, it must refund impact fee revenue in the account according to procedures specified in Section 66001 (d).

As discussed in Section 4 of this report, throughout the Fiscal Year 2024-25 the City has made progress on several active public improvement projects that are funded by impact fees. Also, through the 2025-26 budgeting process, the City made a determination regarding sufficient funds collected to complete several improvements and a construction schedule has been identified. Therefore, no refunds were made or required.

Disclaimer: In preparing this report and any analys is and findings included herein, NBS has relied on several principal assumptions and considerations re garding financial matters, conditions and events th at occurred or may occur in the future. This informat ion and assumptions, including the City’s budgets, financial reports, capital project data, and other information were provided by sources we believe to be reliable; however, NBS has not independently verifi ed such information and assumptions. While we belie ve NBS’ use of such information and assumptions is reasonable for the purpose of this report, some assumptions will invariably not materialize as stat ed herein and may vary due to unanticipated events and circumstances.

__________________________________________________ _________________________________________________________________________ City of Victorville
ATTACHMENT 1
__________________________________________________ _________________________________________________________________________

City of Victorville Residential Development Impact Fees Master Fee Schedule in effect between July 1, 2024, and December 31, 2024

__________________________________________________ _________________________________________________________________________ City of Victorville
ATTACHMENT 2
__________________________________________________ _________________________________________________________________________

City of Victorville Residential Development Impact Fees Master Fee Schedule in effect between January 1, 2025, and June 30, 2025

__________________________________________________ _________________________________________________________________________ City of Victorville
ATTACHMENT 3
__________________________________________________ _________________________________________________________________________

City of Victorville Non-Residential Development Impact Fees Master Fee Schedule in effect between July 1, 2024, and February 28, 2025

__________________________________________________ _________________________________________________________________________ City of Victorville
ATTACHMENT 4
__________________________________________________ _________________________________________________________________________

City of Victorville Non-Residential Development Impact Fees Master Fee Schedule in effect between March 1, 2025, and June 30, 2025