ATTACHMENT C
REVISED BID
TABULATION FOR
17053 D STREET
City of Victorville
Finance
John Mendiola, Purchasing Manager
14343 Civic Drive, Victorville, CA 92392
EEVALUATIONN TABULATIONN
NIB No. JR26-082
Old Town Facade Program Construction Project at 17053 D Street and 15593 7th Street RESPONSE DEADLINE: March 20, 2026 at 2:00 pm
Report Generated: Friday, March 20, 2026
SELECTEDD VENDORR TOTALS
Vendor Total
Global Builders Inc $199,336.00
CONSTRUCTIONN PROJECTT COSTT ESTIMATE:: PROJECTT A:: 170533 DD STREET Constructionn Projectt Costt Estimate:: PROJECTT A:: 170533 DD STREET Globall Builderss Inc
Selected Linee Item Description:: Projectt AA -- 170533 DD Street Unitt off Measure Unitt Cost Forr thee purposee off identifyingg areass att thiss location,, pleasee considerr thee buildingg inn twoo parts,, eastt sidee andd westt side.. Divvidee downn thee centerr off thee buildingg ass facingg thee frontt fromm DD Street.
Providee alll laborr andd materialss ass requiredd byy thee approvedd buildingg planss forr aa completee installationn off thee linee itemss listedd below.. ESTIMATEE PROJECTT COMPLETIONN (DAYS):: ________________
X 1 Patch and repair stucco at front and West side of building. Repaint in owner’s choice of color per the approved plans.
1 $6,322.00
X 2 Provide and install new brick/stone veneer in owner’s choice of color per the approved plans on the East side column.
1 $9,017.00
X 3 Install stained and sealed wood veneer at face of East side store front per the approved plans. Include all required trim and edge treatment for a finished look. 1 $8,562.00
$185,552.00
EVALUATION TABULATION
NIB No. JR26-082
Old Town Facade Program Construction Project at 17053 D Street and 15593 7th Street
EVALUATION TABULATION
Request for Bid - Old Town Facade Program Construction Project at 17053 D Street and 15593 7th Street
CConstructionn Projectt Costt Estimate:: PROJECTT A:: 170533 DD STREET GGloball Builderss IInc
SSelected LLinee Item DDescription:: Projectt AA -- 1170533 DD Street UUnitt off Measure UUnitt Cost X 4 Fabricate, powder coat and install cable awning above window at East side store front per approved plans.
1 $0.00
X 5 Demo planter at West side store front and install 4” raised, broom finished concrete for planter shelf at sidewalk below window.
1 $4,325.00
X 6 Frame out columns and soffit per approved plans at West side store front and install metal cladding with proper backing and underlayment per manufacturer’s specs in owner’s choice of color per approved plans. Include all required trim and edge treatment for a finished look.
1 $0.00
X 7 Install metal parapet cap with popout at West side roof line i n owner’s choice of color per approved plans.
1 $3,469.00
X 8 Replace all storefront glass panes. 1 $8,847.00
X 9 Provide accessible entrance and path of travel from public right of way to building.
Maneuvering clearance required at front entry from hinge side of door to 18” beyond strike side of door and extending out 60” from the face of the door. Max door opening force is 5 lbs maximum. Path of travel from front door to sidewalk shall have a maximum running slope of 5% and maximum cross slope of 2%. If running slope is over 5% then a ramp may be used with a maximum running slope of 8%. Ramps require compliant handrails and edge protection on both sides as well as level landings (2% slope in any direction) at top and bottom. The landing shall extend 60” in the direction of the ramp run at the top and 72” at the bottom. 1 $11,980.00
Demo planter at West side store front and install 4” raised, broom finished concrete for planter shelf at sidewalk below window.
5 $4,325.001
7 Install metal parapet cap with popout at West side roof line in owner’s choice of color per approved plans.
1 $3,469.00
EVALUATION TABULATION
NIB No. JR26-082
Old Town Facade Program Construction Project at 17053 D Street and 15593 7th Street
EVALUATION TABULATION
Request for Bid - Old Town Facade Program Construction Project at 17053 D Street and 15593 7th Street
CConstructionn Projectt Costt Estimate:: PROJECTT A:: 170533 DD STREET GGloball Builderss IInc
SSelected LLinee Item DDescription:: Projectt AA -- 1170533 DD Street UUnitt off Measure UUnitt Cost X 10 Provide compliant accessible Van parking stall with striping and signage at back of property adjacent to other existing parking. Stall shall be 12’ wide vehicle space with a 5’ wide unloading aisle or 9’ wide vehicle space with an 8’ wide unloading aisle. Space shall be minimum of 18’ in length. 2% max slope in any direction in parking and unloading aisle. Provide accessible entrance and path of travel from unloading aisle to rear entrance of building. Maneuvering clearance required at entry from hinge side of door to 18” beyond strike side of door and extending out 60” from the face of the door. Max door opening force is 5 lbs maximum. Maximum threshold height is ½" with a beveled slope not steeper than 1:2. Provide accessible hardware at door. Path of travel from parking to door shall have a maximum running slope of 5% and maximum cross slope of 2%.
1 $1,018.00
X 11 Furnish and install new wall sconce light fixtures at locations shown on Sheet E-1 and convert interior lighting within the existing pole sign box to LED illumination, including all wiring, connections, labor, materials, equipment, and incidentals required to complete the work.
1 $13,303.00
X 12 Remove and dispose of existing shed. 1 $5,990.00
Total $72,833.00
CCONSTRUCTIONN PROJECTT COSTT ESTIMATE:: PROJECTT B:: 155933 7THH STREET Constructionn Projectt Costt Estimate:: PROJECTT B:: 155933 7THH STREET Globall Builderss Inc
Selected Linee Item Description:: Projectt BB -- 155933 7thh Street Unitt off Measure Unitt Cost Providee alll laborr andd materialss ass requiredd byy thee approvedd buildingg planss forr aa completee installationn off thee linee off thee linee itemss listedd below.. ESTIMATEE PROJECTT COMPLETIONN (DAYS):: ___________
12 Remove and dispose of existing shed. 1 $5,990.00
$59,049.00