ATTACHMENT A
(QJLQHHULQJ)<
4
4XDUWHUO\8SGDWH
City of Victorville
Engineering Department
July 1, 2026 through September 30, 2026
The first quarter of Fiscal Year 2026/27 has been a very productive period for the City of Victorville Engineering Department. From July 1through September 30, 2026, our team continued to advance projectsand initiatives that improve the safety, reliability, and long-termsustainability of our City's infrastructure.This quarter, we celebrated the completion of important constructionprojects, including a crosswalk enhancement project, which improvedpedestrian safety at nine intersections through the installation ofrectangular rapid flashing beacons, enhanced pavement markings, andnew signage. At the same time, construction continued on major waterand sewer infrastructure projects, including the Sewer Lining Project –Phase 3, which will rehabilitate approximately 16,000 linear feet ofsewer pipelines and approximately 326 service laterals.We also advanced several significant projects that will support theCity's future growth and infrastructure needs. Major projects movingtoward construction include the 1-MG SCLA Reclaimed Water Reservoir2, the Turnout 5 Project, and the HWY 395 Water Relocation Project.These projects represent substantial investments in our waterinfrastructure and will help strengthen system reliability, expand waterresources, and accommodate regional transportation improvements.The HWY 395 Water Relocation Project, for example, has reached 100%design and is being prepared for advertisement, with an estimatedconstruction value of $11 million.Our Capital Improvement Program also continues to move forward withnumerous roadway, drainage, sewer, water, and traffic projects indesign. Projects such as the Ridgecrest Road traffic signal, each MojaveDrive Improvement phase, Third Avenue Street Improvements, andimprovements at the Industrial Wastewater Treatment Plantdemonstrate our continued focus on improving mobility, safety, systemcapacity, and the quality of life for our residents. I am pleased toannounce planning has begun on the Amethyst Road sidewalk projectand Air Expressway street project.

A Message from the City Engineer Beyond capital projects, the Engineering Department continued to provide essential development and technical services throughout theCity. During the quarter, our Development Engineering teamcompleted 254 permit plan checks, including 84 residential and 170commercial reviews, with additional reviews remaining in progress.The team also completed 1,423 construction inspections whilecontinuing to review hydrology, geotechnical, water quality, water andsewer feasibility, traffic studies, civil improvement plans, and right-ofway permits.Our Surveying and Mapping team continued to provide critical supportto Engineering, the Capital Improvement Program, Public Works,SCLA, and Economic Development, completing survey and mappingwork and developer document reviews that support projectsthroughout the City. Our Traffic Engineering team likewise continuedimplementing improvements focused on traffic operations andpedestrian safety, including signal timing modifications andintersection safety improvements.The accomplishments highlighted in this report are the result of thecombined efforts of our engineers, surveyors, plan checkers,inspectors, drafters, and administrative staff. I am proud of theprofessionalism, dedication, and teamwork demonstrated by theentire Engineering Department throughout the year.As we move into the next fiscal year, we remain committed todelivering projects efficiently, maintaining and improving ourinfrastructure, supporting responsible development, pursuingopportunities to leverage available funding, and planning strategicallyfor the future needs of our growing community.Thank you to the entire Engineering Department for your continuedhard work and commitment to serving the residents of the City ofVictorville.

Thank you,
Harry Mayo, Assistant City Engineer

ORGANIZATIONAL STRUCTURE
Project
Updates Q1

CONSTRUCTION

COMPLETED

CAPITAL IMPROVEMENT PROJECTS
Crosswalk Enhancement Project
This project improved the safety of nine (9) intersections by installing rectangular rapid flashing beacons with additional pavement markings and signage.

Contract Award: April 21, 2026Contractor: Gentry General Engineering, Inc.Contract Amount: $ 501,912.50Final Contract Amount: $ 486,074.12Start of Construction: June 22, 2026Completion Date: August 17, 2026 Location 5
Location 6
Location 1 Location 2
Location 3
Location 7
Location 5 Location 6Location 8
Location 4
Location 9

CONSTRUCTION

IN PROGRESS

CAPITAL IMPROVEMENT PROJECTS
Sewer Lining Project – Phase 3
This project will rehabilitate about 16,000 linear feet ofexisting 8-inch and 10-inch sewer pipelines using cured-inplace pipe (CIPP) lining, along with approximately 326 top-hatservice lateral repairs at various locations throughout theCity. This project also includes spot repairs of broken ordeteriorated pipe segments identified through CCTVinspections conducted in compliance with the City’s SewerSystem Maintenance Plan throughout the City.

Bid Opening Date: February 19, 2026 Contractor: Insituform Technologies, LLC Contract Amount: $2,224,346Contract Award: April 7, 2026Start of Construction: August 26, 2026 Estimated Completion Date: Winter 2026
1MG SCLA Reclaimed Water Reservoir 2 Project
The project includes construction of a new 1-million-gallon (MG) prestressed concrete circular reclaimedwater reservoir at SCLA to replace the existing 600,000-gallon open pond, which has maintenancechallenges, algae growth, debris accumulation, and evaporation losses. The work also includesconstruction of a new pump station, extension of a potable water backup supply line, installation ofoverflow facilities, and on-site improvements of a massive extent.

Bid Opening Date: July 9, 2029Contractor: Pacific Hydro Tech CorporationContract Award: September 1, 2026Contract Amount: $ 9,911,740.00Start of Construction: February 2027Estimated Completion Date: October 2028 Turnout 5 Project
This project will construct the Victorville Water District’s thirdconnection to the Mojave Water Agency’s Regional Recharge andRecovery (R3) system, including a connection to the R3 pipeline,approximately 1.25 miles of 24-inch water main, and a new meteringfacility at the Amethyst Pump Station. The project will provide StateWater Project (SWP) water through the R3 system as a supplementalwater supply to the City’s domestic water system, serving PressureZone 3290 and adjacent pressure zones. The project will also allowSWP water to be blended with groundwater to reduce arsenicconcentrations, support regulatory compliance, and reducereliance on arsenic treatment facilities.

Bid Opening Date: August 5, 2026Contractor: High Desert Underground Inc.Contract Award: September 1, 2026Contract Amount: $ 5,323,535.00Start of Construction: November 2026Estimated Completion Date: June 2027 Block Wall Project –
Well Sites: 128, 131 and 201
This project will enhance safety and security at Well Sites 128, 131, and 201 by replacing existing chain-linkfencing with 6-foot concrete masonry unit (CMU) block walls topped with 4-foot anti-climb spike extensions.In addition to improving site security, the new block walls and automated gates will enhance the visualappearance of these critical infrastructure sites, supporting the District’s goals for improved aesthetics inpublic-facing areas.

Bid Opening: April 28, 2026Contractor: KNC Construction, Inc.Contract Amount: $709,008Contract Award: June 2, 2026Start of Construction: October 2026Estimated Completion Date: March 2027 La Mesa Fire Hydrant Addition Project – Phase 2
This project will install two additional hydrants along La Mesa Road between El Rio Road and El Evado Roadto address insufficient fire protection coverage.Bid Opening Date: March 5, 2026Contractor: Capo A General ContractingContract Amount: $77,777.77Contract Award Date: June 25, 2026Start of Construction: October 13, 2026Estimated Construction Completion: October 30, 2026

CAPITAL IMPROVEMENT PROJECTS

UPCOMINGCONSTRUCTION PROJECTS
2026 Citywide Pavement Preservation and
Maintenance Project
This project is part of the annual pavement preservation andmaintenance program, which includes slurry sealing streets throughoutthe City.Bid Opening: September 10, 2026Contractor: Pavement Coatings, Co.Contract Amount: $1,590,182.81Contract Award: October 2026Start of Construction: Fall 2026Estimated Completion Date: Fall 2026 Sewer Diversion at Winona and 11th Street
This project will construct a new sewer diversion facility at Winona Streetand 11th Street to redirect wastewater to the intended sewer alignmentand reduce surcharge conditions in the downstream Ottawa Avenuesewer main. The project will improve system reliability, balance flowswithin the collection system, and preserve capacity for futuredevelopment.Bid Opening: September 30, 2026Contractor: High Desert Underground Inc.Contract Amount: $261,130.52Anticipated Contract Award: November 3, 2026Start of Construction: January 2027Estimated Completion Date: February 2027 Industrial Wastewater Treatment Plant (IWWTP)
Direct Connection Outlet 1 and 2
This project will improve two manholes and associated piping at the City ofVictorville’s Industrial Wastewater Treatment Plant (IWWTP) through minorreconfiguration, along with replacement of deteriorated equipment, to supportsmoother, more reliable operation.Design Status: 90%Engineer’s Estimate: $400,000Start of Construction: Spring 2027Estimated Completion Date: Summer 2027 HWY 395 Water Relocation Project
SBCTA is the lead agency on a project to widen US-395 from twolanes to four lanes, approximately 3.3 miles of which lies withinthe jurisdictional boundaries of the City of Victorville. Toaccommodate the roadway improvements, the City ofVictorville has developed the HWY 395 Water Relocation Projectto relocate and modify existing water facilities that willbe impacted by the highway widening. The project includesrelocation of 24-inch and 16-inch backbone transmissionmains, installation of 12-inch, 8-inch, and 6-inch water mains,customer service laterals, and associated appurtenances toprotect and maintain reliable water service during and afterconstruction.Design Status: 100% CompleteProjected Advertisement Date: Winter 2026Engineer’s Estimate: $ 11,000,000Anticipated Start of Construction: Spring 2027Estimated Completion Date: Fall 2027

PROJECTS IN

DESIGN PHASE

CAPITAL IMPROVEMENT PROJECTS
Ridgecrest Road at Bluff Crest Street and Vista Point
Drive Traffic Signal
This project will install a traffic signal at Ridgecrest Road at Bluff Crest Street and Vista Point Drive Intersection.A Cooperative Agreement with San Bernardino County was fully executed on February 10, 2026.

Contract Award Date: August 18, 2026Consultant: David Evans and Associates, IncKick-Off Meeting: September 9, 2026Status: Preliminary engineering Third Avenue Street Improvements Project
from Nisqualli Road to Field Street
This project will rehabilitate 3rd Avenue from Nisqualli Road to Field Street. Improvements includedrainage, street lighting, pavement section upgrades, and enhancements to driveways and curbramps.Design Status: 99% CompleteProjected Advertisement Date: Summer 2026 Green Tree Sewer Manhole Replacement
This project will replace existing composite manhole coverswith cast iron covers at a minimum of 12 locations alongGreen Tree Boulevard.Design Status: 100% CompleteProjected Advertisement Date: Summer 2026 Bear Valley Re Stripe Project
This project includes restriping of Bear Valley Road over the I-15 freeway to provide an additional left-turn lane at the Amargosa Road intersection, improving traffic operations and capacity.Design Status: 100% CompleteProjected Advertisement Date: Summer 2026 ,
Mojave Drive Improvements from Amargosa
Road to I-15 Freeway (Phase I)
This project will reconstruct Mojave Drive from Amargosa Road to I-15 Right of Way.Between Condor Road and Amargosa Road, the roadway will be widened along the northside. Improvements include new curb and gutter, sidewalk, ADA-compliant curb ramps, drivewayapproaches, fire hydrants, crosswalks, street lighting, and signage. Sidewalk improvements arecontingent upon right-of-way acquisition and will not be constructed where right-of-way cannot besecured. Any resulting sidewalk gaps will be addressed in Phase III.A landscaped raised median will also be constructed between Amargosa Road and Don Roberto Road.

In-house Design Status: 95% CompleteProjected Advertisement Date: Summer 2026 Phase I
Mojave Drive Improvement Project
from US-395 to Amargosa Road (Phase II)
The Mojave Drive Improvements Project will rehabilitate Mojave Drive from US 395 to Amargosa Road. Theproject also includes construction of curb, gutter, and sidewalk, along with improvements to drivewayapproaches and curb ramps east of El Evado Road.

Design Status: Preliminary DesignEstimated Design Duration: 12 Months Phase II
Mojave Drive Improvement Project
from Condor Road to Seventh Street (Phase III)
From Condor Road to Caltrans I-15 right-of-way includes right-of-way (ROW) acquisition, roadway widening, and expansion from four to six travel lanes, where feasible. The project will also replace existing traffic signals to accommodate the widening and construct new ADA-compliant driveway approaches and sidewalks.From La Paz Drive to Seventh Street, the project will reconstruct the roadway section, install a new traffic signal at 6th Street,and upgrade curb ramps, sidewalks, and driveways to meet ADA standards.

In addition, the project will address missing sidewalk segments that were not constructed during Phase I due to ROW constraints.Project was selected to receive a Surface Transportation Block Grant (STBG). The City anticipates releasing a Request for Proposals (RFP) by Fall 2026 to hire a consultant for design and ROW acquisition services. The City is currently coordinatingwith the Southern California Association of Governments (SCAG) to execute the funding agreement and obligate the grant funds.

Phase III
Bear Valley Road Street Improvements Project
from Monte Vista Road to US-395
This project will rehabilitate and widen Bear Valley Roadfrom Monte Vista Road to US-395 to include one lane ineach direction and a center (turning) lane. This project willalso optimize drainage along this segment of roadway.In-house Design Status: 60% CompleteProjected Advertisement Date: Winter 2027 Bear Valley Road
Amethyst Road Sidewalk Improvements
The Amethyst Sidewalk Project will close a critical sidewalk gap along Amethyst Road from Northstar Avenue to La Mesa Road, creating a continuous and accessible pedestrian connection through the surrounding residential community. The project will improve pedestrian safety and accessibility, strengthen connections to nearby neighborhoods and community facilities, and advance the City’s goal of developing a connected, safe, and ADA-compliant sidewalk network.In-house Design Status: Preliminary design in progressProjected Advertisement Date: Summer 2027 Air Expressway Pavement Rehabilitation
From George Blvd to National Trails Hwy
Air Expressway is an east-west corridor that connects National Trails Highway to US-395. This project will address thesignificant deterioration the road has experienced by providing a full restoration of this segment of road. Restoring thepavement will result In a smoother and safer driving surface for the approximately 21,000 vehicles that use this arterialroad daily.

In-house Design Status: Preliminary design in progressProjected Advertisement Date: Summer 2027 Industrial Wastewater Treatment Plant
(IWWTP) Expansion
The City’s Wastewater Treatment Facility is currently operating at 90% capacity. Anticipated growth inresidential, commercial, and industrial developments has created the need to expand the facility’s capacity. The Cityretained a consultant to evaluate best expansion alternatives and prepare expansion plans up to a 100% design level.Selected Consultant: Woodard & Curran, Inc. Consulting Contract Awarded: August 20, 2024 Start of Design Activities: October 15, 2024Project Status: Phase 2 of the project (100% Design) is underway. Kickoff meeting was held on June 9, 2026.Equipment procurement strategies and funding sources are currently being evaluated. The 60% Design is anticipatedto be completed by mid-November 2026.

National Pollutant Discharge Elimination
System (NPDES) Permit
The City issued a Request for Proposals (RFP) for the preparation of a NationalPollutant Discharge Elimination System (NPDES) Permit to explore an alternativeoption for excess recycled water disposal.Consulting Contract Awarded: December 17, 2024 Selected Consultant: Larry Walker & Associates Project Status: Phase 2 of the infiltration testing is underway to identify apotential location for a percolation pond. The Report of Waste Discharge (ROWD)has been submitted to the Lahontan Regional Water Quality Control Board. Acoordination meeting with VVWRA is being scheduled to discuss the potentialjoint outfall option.

TRAFFIC

ENGINEERING
Signal timing was updated to accommodate the new north leg (southbound Amethyst Road approach) of the intersection. Thetiming modifications included adjustments to pedestrian timing,minimum green time, yellow clearance time, and red clearancetime.Additionally, an asphalt concrete (AC) berm was installed on thenorth leg to improve pedestrian safety by restricting vehiclesfrom making uncontrolled right-turn movements through thepedestrian crossing area. The improvement helps better definethe vehicle path and reduces potential conflicts between rightturning vehicles and pedestrians.

Mojave Dr & Amethyst Rd
The Traffic Division received several complaints regarding off-road vehicles accessing the dirt area at the end of Laurel Oak Road. Recently,an off-road buggy caught fire in the area; fortunately, the incident wasbrought under control.To address the safety concerns and prevent unauthorized vehicle access,the dirt access area was blocked to restrict off-road vehicles fromentering the site.

Faywood Ave & Laurel Oak Rd
Mojave Dr & Jeraldo Dr
Installed a new 7-inch yellow flasher above the SW24-3 sign toimprove traffic safety and pedestrian awareness.

DEVELOPMENT

ENGINEERING

DEVELOPMENT REVIEW
Permit Type Issued
Utility 200Right-of-Way 46Transportation 66Water 124
Review of Hydrology, Geotechnical, Water QualityManagement Plans (WQMP), Water/Sewer Feasibility,and Traffic StudiesIssuance of Conditions of ApprovalReview of Civil Improvement Plans Issuance of Public ROW PermitsInspection During ConstructionProject Acceptance Development
Type
Number of Permit Plan Checks
Completed In Review
Residential 84
3 Commercial 170 6Number of Inspections Completed: 1,423 D
N
Engineering
Planning
Building

DEVELOPMENT ENGINEERING
American Jerky
Hesperia Road
Palmdale Rd
Wet utilities installedRoad paved
Ottawa St
3rd Avenue and Ottawa Street
TR 14132 by Richmond America
Street improvements constructedWet and dry utilities installed Mojave Drive and Onyx Road
TR 16894 by Legacy Homes
Street improvements constructed
Mesa View Drive and Olivine Road
TR 17292 by Richmond America
Olvine RdBear Valley Rd
Street improvements constructed
La Mesa Rd
Luna Rd
Somerset by KB Homes
Monte Vista Road
Street improvements constructed
Westcreek by DR Horton
Mojave Dr
Amethyst Road and Mojave Drive
Major channel constructionTraffic calming measures implemented

SURVEYING /

MAPPING

SURVEYING / MAPPING
Surveying Support Completed
Developer Document Reviews
8 Engineering Department CIP
2 Public Works
5 SCLA
4 VMUS
0 Economic Development 1