Predictive Enrollment Analytics. n.d. Victorville Unified High School District (VVUSD). Website:
https://locator.pea.powerschool.com/?StudyID=206282 (accessed January 26, 2026).
San Bernardino County, Department of Public Works. 2016. Mojave River Watershed Technical Guidance Document for Water Quality Management Plans. April. _____. 2025. Victorville Sanitary Landfill – Facility Information and Expansion Notice. Website:
https://ehs.sbcounty.gov/wp-content/uploads/sites/97/Programs/WaterAndWaste/ PublicNotices/victorville-sanitary-landfill-public-notice.pdf (accessed January 23, 2026).
San Bernardino County Municipal Code (SBMC). 2026. Chapter 88.01 Plant Protection and Management. Website: https://codelibrary.amlegal.com/codes/sanbernardino/latest/ sanberncty_ca/0-0-0-175787 (accessed March 9, 2026).
VICTORVILLE POLICE DEPARTMENT AND CIVIC P ARK P ROJECT
VICTORVILLE , C ALIFORNIA
I NITIAL S TUDY /MITIGATED NEGATIVE DECLARATION
J UNE 2026
P:\2024\20242046_LPA - Victorville Police Station-Park CEQA\03 Working Files\IS_MND\Public Review IS\Victorville_Draft_ IS_260601.docx (06/01/26)
6-6
Southern California Association of Governments (SCAG). 2024. Connect SoCal 2024–2050 Regional Transportation Plan/Sustainable Communities Strategy. Demographics and Growth Forecast, Table 13. Website: https://scag.ca.gov/sites/default/files/2024-05/23-2987-trdemographics-growth-forecast-final-040424.pdf (accessed January 2026).
Southern California Edison. n.d. About Us. Website: https://www.sce.com/about-us (accessed January 25, 2025).
State Water Resources Control Board (SWRCB). 2024. 2024 California Integrated Report (Clean Water Act Section 303(d) List and 305(b) Report). Website: https://www.water boards.ca.gov/water_issues/programs/tmdl/2023_2024state_ir_reports/2024-integratedreport-final-staff-report.pdf (accessed January 23, 2026).
Town of Apple Valley. 1995. Town of Apple Valley Airport Comprehensive Land Use Compatibility Plan. March. Website: https://lus.sbcounty.gov/wp-content/uploads/sites/48/Airports/ AppleValley.pdf (accessed March 2026).
United States Census Bureau. 2024. QuickFacts. Victorville City, California. Website: https://www. census.gov/quickfacts/fact/table/victorvillecitycalifornia/PST045224 (accessed January 22, 2026).
United States Department of Transportation (USDOT). 2025. “Table 4-23: Average Fuel Efficiency of U.S. Light Duty Vehicles.” Website: https://www.bts.gov/content/average-fuel-efficiency-uslight-duty-vehicles (accessed January 2026).
United States Environmental Protection Agency (USEPA). 2025. Outdoor Air Quality Data. Website:
https://www.epa.gov/outdoor-air-quality-data/monitor-values-report (accessed February 2026).
United States Fish and Wildlife Service (USFWS). n.d. Information for Planning and Consultation.
Website: https://ipac.ecosphere.fws.gov/ (accessed January 2026).
United States Geological Survey (USGS). n.d. Hydrology of the Mojave River Basin, California. U.S.
Department of the Interior. Website: https://pubs.usgs.gov/wri/2003/4090/ (accessed January 23, 2026).
Victor Elementary School District (VESD). About. Website: https://www.vesd.net/about (accessed January 26, 2026).
Victor Valley Transit Authority. 2026. VVTA Schedules. Website: https://vvta.org/routes/route-31/( accessed March 21, 2026).
I NITIAL S TUDY /MITIGATED NEGATIVE DECLARATION
J UNE 2026
VICTORVILLE POLICE DEPARTMENT AND CIVIC P ARK P ROJECT
VICTORVILLE , C ALIFORNIA
P:\2024\20242046_LPA - Victorville Police Station-Park CEQA\03 Working Files\IS_MND\Public Review IS\Victorville_Draft_ IS_260601.docx (06/01/26)
6-7
This page intentionally left blank
1 I NITIAL S TUDY /MITIGATED NEGATIVE DECLARATION
J ULY 2026
VICTORVILLE POLICE DEPARTMENT AND CIVIC P ARK P ROJECT
C ITY OF VICTORVILLE
P:\2024\20242046_LPA - Victorville Police Station-Park CEQA\03 Working Files\IS_MND\MMRP\Victorville MMRP.docx (07/17/26)
MITIGATION MONITORING AND REPORTING PROGRAM
MITIGATION MONITORING REQUIREMENTS
This Mitigation Monitoring and Reporting Program (MMRP) is designed to comply with California Public Resources Code (PRC) Section 21081.6, which mandates that a public agency adopt a reporting or monitoring program for changes made to the project or conditions of project approval to mitigate or avoid significant effects on the environment. The reporting or monitoring program must be designed to ensure compliance during project implementation, and mitigation measures must be enforceable through permit conditions, agreements, or other measures. Conditions of project approval may be set forth in referenced documents that address required mitigation measures or, in the case of the adoption of a plan, policy, regulation, or other project, by incorporating the mitigation measures into the plan, policy, regulation, or project design.
The monitoring program contains the following elements:
1) The mitigation measures are recorded with the action and procedure necessary to ensure compliance. In some instances, one action may be used to verify implementation of several mitigation measures.
2) A procedure for compliance and verification has been outlined for each action necessary. This procedure designates who will take action, what action will be taken and when, and to whom and when compliance will be reported.
3) The program has been designed to be flexible. As monitoring progresses, changes to compliance procedures may be necessary based upon recommendations by those responsible for the program. As changes are made, new monitoring compliance procedures and records will be developed and incorporated into the program.
Regulatory compliance measures are presented in instances where the proposed project would not create a significant impact but would be required to adhere to regulatory requirements in order to ensure impacts do not become significant. Regulatory Compliance Measures outline compliance with various federal, State, and/or local acts, laws, rules, regulations, municipal codes, policies, etc.
Table A lists each of the mitigation measures (MM) and regulatory compliance measures (RCM) specified in the Initial Study Mitigated Negative Declaration (IS/MND) for the Victorville Police Department and Civic Park Project and identifies the party or parties responsible for implementation and monitoring of each measure.
VICTORVILLE POLICE DEPARTMENT AND CIVIC P ARK P ROJECT
C ITY OF VICTORVILLE
I NITIAL S TUDY /MITIGATED NEGATIVE DECLARATION
J ULY 2026
2 P:\2024\20242046_LPA - Victorville Police Station-Park CEQA\03 Working Files\IS_MND\MMRP\Victorville MMRP.docx (07/17/26) This page intentionally left blank
3 I NITIAL S TUDY /MITIGATED NEGATIVE DECLARATION
J ULY 2026
VICTORVILLE POLICE DEPARTMENT AND CIVIC P ARK P ROJECT
C ITY OF VICTORVILLE
P:\2024\20242046_LPA - Victorville Police Station-Park CEQA\03 Working Files\IS_MND\MMRP\Victorville MMRP.docx (07/17/26) Table A: Mitigation and Monitoring Reporting Program
Mitigation Measures (MMs) and Regularly Compliance Measures (RCMs) Timing Responsible Party Monitoring Agency Date Completed and Initials
3.1: AestheticsNo significant impacts to aesthetics would occur. No mitigation measures or regulatory compliance measures are required. 3.2: Agricultural and Forestry ResourcesNo significant impacts to agricultural or forestry resources would occur. No mitigation measures or regulatory compliance measures are required.3.3: Air QualityNo significant impacts to air quality would occur. No mitigation measures or regulatory compliance measures are required.3.4: Biological Resources MM BIO-1: Conduct Preconstruction Clearance Surveys for Burrowing Owl. A preconstruction clearance survey is required for burrowing owl (Athene cunicularia) no more than 30 calendar days prior to initiation of project activities. All survey results must be delivered to the City of Victorville. If an active burrowing owl burrow is found within the project site, the applicant must coordinate with the California Department of Fish and Wildlife (CDFW) to obtain applicable agency approval/direction prior to any ground disturbance activities on the site. Specific avoidance, den excavation, passive relocation, and compensatory mitigation activities shall be performed as required by the CDFW. If no active burrowing owl burrows are identified, project activities may proceed as planned following the preconstruction survey.
Prior to project construction
activities and no more than 30
calendar days prior to initiation of
project activities
Qualified Biologist City of Victorville/CDFW
MM BIO-2: California Desert Native Plant Act Permit. A permit application under the California Desert Native Plant Act (CDNPA) shall be submitted to and approved by the San Bernardino County Agricultural Commissioner for any unavoidable impacts to silver cholla (Cylindropuntia echinocarpa) prior to its removal.
Prior to removal of silver cholla
(Cylindropuntia echinocarpa)
Project Applicant/Qualified
Biologist
San Bernardino County Agricultural
Commissioner
MM BIO-3: Nesting Bird Surveys and Avoidance. Project activities shall avoid being conducted during the nesting bird season (February 15 through September 15), if possible. If unable to do so, prior to construction activities (including vegetation removal), a preconstruction nesting bird survey shall be conducted by a qualified biologist no more than 7 days prior to any construction activities. Should nesting birds be found, an exclusionary buffer (depending upon the species) shall be established by the qualified biologist. The buffer shall be clearly marked in the field by construction personnel under guidance of the qualified biologist. A qualified biologist will continue to monitor active nests adjacent to active work areas to determine whether exclusionary buffers are sufficient to prevent stress or other negative behavioral changes to nesting birds. Exclusionary buffers may be adjusted at any time by a qualified biologist based on project activities and nesting bird behavior. No construction activities shall be allowed within the exclusionary buffer until the qualified biologist determines that the young have fledged or the nest is no longer active.
Prior to project construction
activities and no more than 7
calendar days prior to initiation of
project activities
Construction
Contractor/Qualified Biologist
Construction Contractor/Qualified
Biologist
3.5: Cultural ResourcesMM CUL-1: Unknown Archaeological Resources. In the unlikely event that previously unknown archaeological resources are identified during earthmoving activities, further work in the area shall be halted until the nature and significance of the find can be assessed by a qualified archaeologist in accordance with federal, State, and local guidelines to determine whether the find constitutes a “unique archaeological resource,” as defined in Section 21083.2(g) of the California Public Resources Code (PRC). The City and its construction contractor shall not collect or move any archaeological materials and associated materials. Construction activity may continue unimpeded on other portions of the project site. Any found deposits shall be treated in accordance with federal, State and local guidelines, including those set forth in PRC Section 21083.2, and shall be assessed, handled, and treated consistent with accepted standards, such as the Secretary of the Interior’s standards and guidelines for archaeology and historic preservation. Prior to commencement of grading activities, the City of Victorville (City) Community Development Director, or designee, shall verify that all project grading and construction plans include specific requirements regarding California PRC (Section 21083.2[g]) and the treatment of archaeological resources as specified above.
Prior to issuance of grading permits
and during ground-disturbing
activities
Project Applicant/Construction
Contractor/Qualified
Archaeologist
City of Victorville, or designee
VICTORVILLE POLICE DEPARTMENT AND CIVIC P ARK P ROJECT
C ITY OF VICTORVILLE
I NITIAL S TUDY /MITIGATED NEGATIVE DECLARATION
JULY 2026
4 P:\2024\20242046_LPA - Victorville Police Station-Park CEQA\03 Working Files\IS_MND\MMRP\Victorville MMRP.docx (07/17/26) Table A: Mitigation and Monitoring Reporting Program
Mitigation Measures (MMs) and Regularly Compliance Measures (RCMs) Timing Responsible Party Monitoring Agency Date Completed and Initials MM CUL-2: Unknown Cultural Resources. In the event that cultural resources are discovered during project activities, all work in the immediate vicinity of the find (within a 60-foot buffer) shall cease and a qualified archaeologist meeting Secretary of the Interior Professional Qualification Standards shall be hired to assess the find. Work on the other ƉŽƌƚŝŽŶƐŽĨƚŚĞƉƌŽũĞĐƚŽƵƚƐŝĚĞŽĨƚŚĞďƵĨĨĞƌĞĚĂƌĞĂŵĂLJĐŽŶƚŝŶƵĞĚƵƌŝŶŐƚŚŝƐĂƐƐĞƐƐŵĞŶƚƉĞƌŝŽĚ͘ථĚĚŝƚŝŽŶĂůůLJ͕ƚŚĞcultural resources offices of the consulting tribes (Yuhaaviatam of San Manuel Nation, Twenty-Nine Palms Band of Mission Indians, and the Morongo Band of Mission Indians) shall be contacted, as detailed within Mitigation Measure TCR-1, regarding any pre-contact finds and be provided information after the archaeologist makes his/her initial assessment of the nature of the find in order to obtain Tribal input with regards to significance and treatment of the find.
During ground-disturbing activities Qualified Archaeologist Yuhaaviatam of San Manuel Nation/ Twenty-Nine Palms Band of Mission
Indians/ Morongo Band of Mission
Indians
MM CUL-3: Unknown Pre-contact Cultural Resources. If significant pre-contact cultural resources, as defined by CEQA (as amended, 2015), are discovered and avoidance cannot be ensured, the archaeologist shall develop a Monitoring and Treatment Plan, the drafts of which shall be provided to the consulting tribes (Yuhaaviatam of San Manuel Nation, Twenty-Nine Palms Band of Mission Indians, and the Morongo Band of Mission Indians) for review and comment, as detailed within TCR-1. The archaeologist shall monitor the remainder of the project and implement the plan accordingly.
If significant pre-contact cultural
resources are found
Qualified Archaeologist Yuhaaviatam of San Manuel Nation, Twenty-Nine Palms Band of Mission
Indians/Morongo Band of Mission
Indians
MM CUL-4: Inadvertent Discovery Human Remains or Funerary Objects. If human remains or funerary objects are encountered during any activities associated with the project, work in the immediate vicinity (within a 100-foot buffer of the find) shall cease and the County Coroner shall be contacted pursuant to State Health and Safety Code Section 7050.5 and that code enforced for the duration of the project.
During ground-disturbing activities Construction Contractor/County Coroner
City of Victorville, or designee
RCM CUL-1: Inadvertent Discovery Human Remains. If human remains are encountered, State Health and Safety Code Section 7050.5 states that no further disturbance shall occur until the County Coroner has made a determination of origin and disposition pursuant to PRC Section 5097.98. The County Coroner shall be notified of the find immediately. If the remains are determined to be prehistoric, the Coroner shall notify the Native American Heritage Commission (NAHC), which shall determine and notify a Most Likely Descendant (MLD). With the permission of the landowner or his/her authorized representative, the MLD may inspect the site of the discovery. The MLD shall complete the inspection within 48 hours of notification by the NAHC. The MLD may recommend scientific removal and nondestructive analysis of human remains and items associated with Native American burials.
During ground-disturbing activities Project Applicant/Construction Contractor
City of Victorville, or designee
3.6: EnergyNo significant impacts related to energy resources. No mitigation measures or regulatory compliance measures are required.3.7: Geology and SoilsMM GEO-1: Implementation of Geotechnical Evaluation Recommendations. The City’s Construction Contractor shall implement the recommendations of the Geotechnical Evaluation prepared for the proposed project, as applicable, to the satisfaction of the City of Victorville (City) Chief Building Official, or designee. The City’s Chief Building Official, or designee, shall confirm recommendations have been implemented into the design and construction of the proposed project prior to the issuance of a building permit.
Prior to the issuance of a building
permit
City’s Construction Contractor City’s Chief Building Official, or designee
MM GEO-2: Paleontological Resources. Prior to the commencement of ground-disturbing activities, a qualified, professional paleontologist who meets the standards set by the Society of Vertebrate Paleontology (SVP) shall be retained to develop a Paleontological Resources Impact Mitigation Program (PRIMP) for this project. The PRIMP shall be consistent with the guidelines of the SVP and shall include the methods that will be used to protect paleontological resources that may exist within the project limits, as well as procedures for monitoring, fossil preparation and identification, curation into a repository, and preparation of a report at the conclusion of ground disturbance.
If ground-disturbing activities occur in deposits with high paleontological sensitivity (i.e., Older Alluvial Fan Deposits, Unit 2), those activities shall be monitored by a qualified paleontological monitor following the PRIMP. If paleontological resources are encountered during the course of ground disturbance, the paleontological monitor shall have the authority to temporarily redirect construction away from the area of the find in order to assess its significance. Once soils have been monitored during the excavation stage and determined to lack the presence of paleontological resources, monitoring of these soils would no longer be necessary for the remainder of grading Prior to the commencement of
ground-disturbing activities
Project Applicant/Construction
Contractor/Qualified
Paleontologist/City of Victorville
City of Victorville, or designee
5 I NITIAL S TUDY /MITIGATED NEGATIVE DECLARATION
J ULY 2026
VICTORVILLE POLICE DEPARTMENT AND CIVIC P ARK P ROJECT
C ITY OF VICTORVILLE
P:\2024\20242046_LPA - Victorville Police Station-Park CEQA\03 Working Files\IS_MND\MMRP\Victorville MMRP.docx (07/17/26) Table A: Mitigation and Monitoring Reporting Program
Mitigation Measures (MMs) and Regularly Compliance Measures (RCMs) Timing Responsible Party Monitoring Agency Date Completed and Initials activities. Paleontological monitoring can be reduced at the discretion of the qualified Project Paleontologist. In the event that paleontological resources are encountered when a paleontological monitor is not present, work in the immediate area of the find shall be redirected and the paleontologist or paleontological monitor shall be contacted to assess the find for scientific significance. If determined to be scientifically significant, the fossil shall be collected from the field. Scientifically significant paleontological resources that are collected shall be prepared to the point of identification, identified to the lowest taxonomic level possible, cataloged, and curated into the permanent collections of a museum repository. At the conclusion of the monitoring program, a report of findings shall be prepared to document the results of the monitoring program.
Refer to RCMs HYD-1 through HYD-4 (cited under 3.10: Hydrology and Water Quality). 3.8: Greenhouse Gas EmissionsNo significant impacts related to greenhouse gases. No mitigation measures or regulatory compliance measures are required.3.9: Hazards and Hazardous MaterialsRefer to RCMs HYD-1 through HYD-4 (cited under 3.10: Hydrology and Water Quality). 3.10: Hydrology and Water QualityRCM HYD-1: Construction General Permit. Prior to the commencement of any land-disturbing activities, the Construction Contractor shall obtain coverage under the State Water Resources Control Board (SWRCB) National Pollutant Discharge Elimination System (NPDES) General Permit for Stormwater Discharges Associated with Construction and Land Disturbance Activities (Order No. 2022-0057-DWQ, National Pollutant Discharge Elimination System No. CAS000002) (Construction General Permit). This shall include submission of Permit Registration Documents (PRDs), including a Notice of Intent for coverage under the permit to the SWRCB via the Stormwater Multiple Application and Report Tracking System (SMARTs). The City of Victorville (City) shall provide the Waste Discharge Identification Number (WDID) to the Planning Manager of the City or designee, to demonstrate proof of coverage under the Construction General Permit. Project construction shall not be initiated until a WDID is received from the SWRCB and is provided to the City, or designee. A Stormwater Pollution Prevention Plan (SWPPP) shall be prepared by a Qualified SWPPP Developer in accordance with the requirements of the Construction General Permit. These include: BMPs for erosion and sediment control, site management/housekeeping/waste management, management of non-stormwater discharges, run-on and runoff controls, and BMP inspection/maintenance/repair activities. BMP implementation shall be consistent with the BMP requirements in the most recent version of the California Stormwater Quality Association’s Stormwater Best Management Handbook: Construction. The SWPPP shall include a construction site monitoring program that identifies requirements for dry weather visual observations of pollutants at all discharge locations, and as appropriate (depending on the Risk Level), sampling of the site effluent and receiving waters. A Qualified SWPPP Practitioner shall be responsible for implementing the BMPs at the site and performing all required monitoring and inspection/maintenance/repair activities. Upon completion of construction and stabilization of the site, a Notice of Termination shall be submitted via SMARTs.
Prior to the commencement of any
land-disturbing activities
Project Applicant/Construction
Contractor
City of Victorville/SWRCB
RCM HYD-2: City of Victorville Municipal Code. Prior to the issuance of a grading permit, the City of Victorville shall review and approve final project plans to ensure compliance with the water quality management requirements outlined in Victorville Municipal Code Chapter 10.30 – Storm Water and Urban Runoff Management and Discharge Control. In accordance with Section 10.30.210, all applicants for projects involving construction activities, regardless of size, shall submit an Erosion and Sediment Control Plan (ESCP) to the City for review and approval. The ESCP shall conform to the most recent version of the California Stormwater Quality Association (CASQA) Construction Stormwater BMP Handbook and include, at a minimum:
x A description of the proposed project and soil-disturbing activity; x Site-specific construction-phase BMPs; x Rationale for BMP selection;
x A list of applicable outside agency permits (e.g., CGP, 401/404 permits, 1600 agreements); Prior to the issuance of a grading
permit
Project Applicant/Construction
Contractor
City of Victorville
VICTORVILLE POLICE DEPARTMENT AND CIVIC P ARK P ROJECT
C ITY OF VICTORVILLE
I NITIAL S TUDY /MITIGATED NEGATIVE DECLARATION
JULY 2026
6 P:\2024\20242046_LPA - Victorville Police Station-Park CEQA\03 Working Files\IS_MND\MMRP\Victorville MMRP.docx (07/17/26) Table A: Mitigation and Monitoring Reporting Program
Mitigation Measures (MMs) and Regularly Compliance Measures (RCMs) Timing Responsible Party Monitoring Agency Date Completed and Initials x Drawings of the site BMPs.
The ESCP must be implemented year-round and updated as site conditions change. If the project is subject to the Construction General Permit (CGP), a copy of the WDID and/or Notice of Intent (NOI) shall be submitted to the City prior to permit issuance. Additionally, prior to the issuance of a building or construction permit, the project applicant shall prepare a PostConstruction BMP Design Plan and a Stormwater Management Facilities Operation and Maintenance (O&M) Plan in accordance with the Small Phase II MS4 Permit. These plans shall detail the post-construction BMPs intended to control the volume, rate, and pollutant load of stormwater runoff from the project site. All post-construction BMPs shall comply with the applicable standards in the CASQA Stormwater BMP Handbook.
RCM HYD-3: Phase II Small MS4 Permit Compliance. Prior to issuance of a grading permit, the City of Victorville shall review and approve a Final Water Quality Management Plan (WQMP) in compliance with the National Pollutant Discharge Elimination System (NPDES) General Permit for Waste Discharge Requirements (WDRs) for Storm Water Discharges from Small Municipal Separate Storm Sewer Systems (MS4s), State Water Resources Control Board Order No. 2013-0001-DWQ, NPDES No. CAS000004, as amended. The WQMP shall include project-specific site design measures, source control measures, Low Impact Development (LID) design standards, hydromodification controls, operation and maintenance procedures for stormwater control measures, and post-construction BMPs. The WQMP shall also include any required water quality monitoring actions to ensure that water quality thresholds are maintained and that all stormwater facilities meet the required sizing and performance criteria established in the Mojave River Watershed Technical Guidance Document.
Prior to the issuance of a grading
permit
Project Applicant/Construction
Contractor
City of Victorville Engineer/Public Works Director, or designee RCM HYD-4: Storm Drainage Master Plan (SDMP). Prior to issuance of a grading permit, the City of Victorville shall review and approve a Final Storm Drainage Master Plan (SDMP) to ensure compliance with the City’s Design Guidelines for Drainage Channels, Basins, and Landscape Areas, the San Bernardino County Hydrology Manual, and the Mojave River Watershed Technical Guidance Document. The SDMP shall evaluate the capacity of the existing storm drain system at the southeast corner of Civic Drive and Seneca Road, identify any deficiencies, and confirm that the proposed stormwater infrastructure—including planters, underground storage tanks, and tie-ins—can effectively manage runoff without causing downstream flooding or erosion. The SDMP shall also verify that the project’s stormwater system is designed in accordance with the City’s water quality and flood control standards.
Prior to the issuance of a grading
permit
Project Applicant/Construction
Contractor
City of Victorville
3.11: Land Use and PlanningNo significant impacts to land use and planning would occur. No mitigation measures or regulatory compliance measures are required. 3.12: Mineral ResourcesNo significant impacts to mineral resources would occur. No mitigation measures or regulatory compliance measures are required.3.13: NoiseNo significant impacts to noise would occur. No mitigation measures or regulatory compliance measures are required.3.14: Population and HousingNo significant impacts related to population or housing would occur. No mitigation measures or regulatory compliance measures are required.3.15: Public Services No significant impacts related to public services would occur. No mitigation measures or regulatory compliance measures are required.3.16: RecreationNo significant impacts related to recreation would occur. No mitigation measures or regulatory compliance measures are required.3.17: TransportationRCM TRAN-1: Implementation of Traffic Study Recommendations. The City’s construction contractor shall implement the recommendations of the Traffic Study prepared for the proposed project, as applicable, to the satisfaction of the City of Victorville’s (City) Building Official, or designee. The City’s Building Official, or designee, shall confirm recommendations have been implemented into the design and construction of the proposed project prior to the issuance of a building permit.
Prior to the issuance of building
permits
City’s Construction Contractor City of Victorville’s Building Official, or designee
3.18: Tribal Cultural ResourcesRefer to MM CUL-1 through MM CUL-4 and RCM CUL-1 (cited under 3.5: Cultural Resources). 7 I NITIAL S TUDY /MITIGATED NEGATIVE DECLARATION
J ULY 2026
VICTORVILLE POLICE DEPARTMENT AND CIVIC P ARK P ROJECT
C ITY OF VICTORVILLE
P:\2024\20242046_LPA - Victorville Police Station-Park CEQA\03 Working Files\IS_MND\MMRP\Victorville MMRP.docx (07/17/26) Table A: Mitigation and Monitoring Reporting Program
Mitigation Measures (MMs) and Regularly Compliance Measures (RCMs) Timing Responsible Party Monitoring Agency Date Completed and Initials MM TCR-1: Tribal Notification and Monitoring Plan. The cultural resources offices of the consulting tribes (Yuhaaviatam of San Manuel Nation, Twenty-Nine Palms Band of Mission Indians, and the Morongo Band of Mission Indians) shall be contacted, as detailed in Mitigation Measure CUL-2, of any pre-contact cultural resources discovered during project implementation, and be provided information regarding the nature of the find, so as to provide Tribal input with regards to significance and treatment. Should the find be deemed significant, as defined by CEQA (as amended, 2015), a Cultural Resources Monitoring and Treatment Plan shall be created by the archaeologist, in coordination with the consulting tribes (Yuhaaviatam of San Manuel Nation, Twenty-Nine Palms Band of Mission Indians, and the Morongo Band of Mission Indians), and all subsequent finds shall be subject to this Plan. This Plan shall allow for a monitor to be present that represents the consulting tribes (Yuhaaviatam of San Manuel Nation, Twenty-Nine Palms Band of Mission Indians, and the Morongo Band of Mission Indians) for the remainder of the project, should they elect to place a monitor on-site.
During project implementation Project Applicant/City of Victorville
Yuhaaviatam of San Manuel Nation/
Twenty-Nine Palms Band of Mission
Indians/ Morongo Band of Mission
Indians
MM TCR-2: Cultural Resources Documentation and Consultation. Any and all archaeological/cultural documents created as a part of the project (isolate records, site records, survey reports, testing reports, etc.) shall be supplied to the applicant and Lead Agency for dissemination to the consulting tribes (Yuhaaviatam of San Manuel Nation, TwentyNine Palms Band of Mission Indians, and the Morongo Band of Mission Indians). The Lead Agency and/or applicant shall, in good faith, consult with the consulting tribes (Yuhaaviatam of San Manuel Nation, Twenty-Nine Palms Band of Mission Indians, and the Morongo Band of Mission Indians) throughout the life of the project͘ථ Throughout the life of the project Project Applicant/City of Victorville
Yuhaaviatam of San Manuel Nation/
Twenty-Nine Palms Band of Mission
Indians/ Morongo Band of Mission
Indians
3.19: Utilities and Service SystemsNo significant impacts related to utilities and service systems. No mitigation measures or regulatory compliance measures are required.3.20: WildfireNo significant impacts related to wildfire. No mitigation measures or regulatory compliance measures are required.Source: LSA (2026). DDсDŝƟŐĂƟŽŶDĞĂƐƵƌĞRCM = Regulatory Compliance Measure