PPRROOPPOOSSAALL
Contractor’s License No. AZ 270176 – CA 982578
28770 Avenue 14 ½ Madera CA 93638
Phone: (866) 527-2967 FAX: (559)675-1821
D.I.R # 1000005672
Date: October 5, 2022
Base Bid: Polyurethane Foam Roofing System – 1.5” of foam, 6 gallons per square of protective coating. Remove up to 200 square feet of wet insulation. Install 24 GA sheet metal flashing, Cut out roofing to the deck around all scuppers to create a water block, 20 year warranty
One Hundred Ninety Eight Thousand Seven Hundred Forty Seven Dollars $198,747.00
Cost to replace dry rot $25.00 per square foot This proposal is valid for 90 days.
We propose to furnish all of the materials and perform all necessary labor to complete of the above referenced project according to the plans and specifications; including all taxes:
If accepted this proposal shall become part of the contract, in the case of any conflicts or inconsistencies this proposal shall control.
Should you have any questions or require any additional information please contact me on my cell at 559-547-7780.
Sincerely,
John Kemmer
John Kemmer
Estimator
Re: Fire Station 55
City of Visalia
6921 E Ferguson Ave
Visalia CA