Cities Index.
Forcum/Mackey Bid Proposal City of Visalia

Visalia City Council
October 17, 2022

Document
Forcum/Mackey Bid Proposal City of Visalia
Meeting
October 17, 2022
Body
Visalia City Council
Original file
165 KB
Text extracted from the city's file for reading and search. Open the original on visalia.legistar1.com. That file is the official record.

City Of Visalia
Visalia Airport
9501 W Airport Dr
Visalia, CA 93277
10/06/2022
TOTAL AMOUNT FOR THIS BID PROPOSAL: $70,659
NOTE: Add Alternate should existing Main Panel/Transformer be deemed faulty Add: $7,380 Current lead time on a New Panel/Transformer is Appx 5 Months Sincerely,
Joey Mackey Jody Miller
Forcum/Mackey Construction City of Visalia-Airport
City of Visalia Airport Hangar "D" Damage Repair
Attn: Jody Miller
Please accept this proposal which includes all labor, material, tax, supervision and equipment necessary, to complete in a thoroughly professional manner the City of Visalia Airport Hangar "D" Damage/Repair. • Scope of work: Demo and Replace approximately 25' on the south east corner of Airport Hangar. Remove and Replace: Exterior Panels, Interior Liner Panel, Bent Z Purlins and Remove and provide a new 3'x7' Walk Door to be painted. (Electrical work as mentioned below)
Joey Mackey
• Electrical:
*Disconnect electrical wiring and remove bent or broken conduits around main panel in Hangar "D" so the wall material can be removed and replaced.
*Replace 100A , 480V Feeder Breaker in Main Meter Service at N/E corner of the building. *Replace #2 Feeder wires from Meter Service to Hangar "D" Main Electrical Panel/Transformer *Reattach the existing Main Electrical Panel/Transformer after the wall has been repaired **NOTE: Add Alternate should a new Main Panel/Transformer be needed, See cost below Not included in Base bid** *Replace the electrical gutter, wireway that was mounted under the main electrical panel and reconnect 2" main feeder counduit and for 3/4" load conduits, replace coduit wiring as needed. Check Wire conncections in junction-boxes for al (4) 3/4" conduits, repair as needed. *Inspect and reconnect existing load wiring to main panel, replace wiring as needed.

Clarifications/Qualifications: This proposal is based on the Job site walk with Airport Personel on Wednesday (10-5-22). All prices quoted are valid for 30 days.

Exclusions: All work not specifically described in scope of work mentioned above.

If you have any questions regarding this Proposal, don’t hesitate to call me at my office.

The vision to see ahead and the creativity to make it come true! 15695 Jasmine Ave., Ivanhoe, CA 93235 • State License #473785 A/B • Telephone (559) 798-1837 • Fax (559) 798-1412 • [email protected]

← All documents from this meeting