* MASTER: 2023 FebruaryApril Storms
Request Status
Status Coordinating
Mission ID 2023SOC107139
Mission Coordinator Info
Name Elizabeth Wilder
Location SOC
Position MRT
Agency Cal OES
Action Taken
5/19/23 0809 EWilder: Per Joanne Gurrola Pumps will be placed generally in the ag areas around Visalia and Tulare. 5/18/23 1015 JGurrola: New request created to task to DWR for approval under the Temporary Groundwater Improvement program.
IDO/GeoOps/SOC MT notified by email.
Details Requesting Point of Contact
Operational Area Tulare Name Aaron Fukuda
Request Summary Pumps for Water Diversion Project to alleviate flooding in the Tulare Lake Bottom area. Agency Tulare Irrigation District Suggested Source DWR Phone 5597078928
Date/Time Required 05/18/2023 17:00:00 Alternate Phone 5596863425 Date/Time Required Until 07/31/2023 17:00:00
Priority NOW
Resource Request Information
Resource Needed Flood Fight Technical Advisors
Resource Coordinator
Category Resources (EF07)
Detailed Resource
Description
The Tulare Irrigation District (District or TID) requests temporary water pumps to be placed in various locations throughout our district to provide flood relief, to increase use of surface water for irrigation, and to increase recharge demand. By increasing spreading capacity, TID will reduce the amount of water spilled from Lake Kaweah to the Tulare Lake Bottom by approximately 6,800acre feet, which is currently facing significant flooding concerns. The pumps are expected to run from May 15, 2023, to July 15,2023. The 300 mile TID distribution system of canals and ditches traverses in a southwest direction and spills into the Lake Bottom at the southwest corner of our District. We have three spill locations that send water to canal systems that increase flooding potential in the Tulare Lake Bottom. These flood diversions carry out the recent Governors executive orders N423 and N623 to do everything possible to maximize flood diversions. Tulare Irrigation District has exhausted all resources and is unable to procure materials locally for this action. TID ID proposes the following locations for increased diversion and spreading: •Swall Basin – 125acre recharge basin: Install two 20 cubic feet per second (cfs) pumps toincrease the diversion capacity by approximately 20 cfs.
•City of Tulare Liberty Stormwater Basin – Existing stormwater basin: Install a 5 cfs pumpto provide diversion into an existing stormwater basin adjacent to the Liberty Ditch.
•Nichols Fallow Field – 35acres provided by Nichols Farming to increase groundwaterrecharge: Install a 5 cfs pump and gated pipeline to provide recharge on the 35 acres.
•Visser Fallow/Farmed Field – 130acres provided by Visser Farming to increasegroundwater recharge and surface water usage: install 5 cfs pump from VLine Ditch
Quantity Requested 5 Other
Size of Resource
Operator Required No
Fuel Required No
Other Items Required
Resource Delivery Information Delivery Point of Contact Information Street Address 6826 Ave 240 Map Name Aaron Fakuda
Lat / Long / Agency Tulare Irrigation District
Site Type TID Office Location Phone Number 5597078928 Site Name Tulare Irrigation District Alternate Phone 5596863425 Special Instructions Please call Aaron Fukuda (TID) as there will be multiple locations File Attachments
Attachment Visalia DWR request letter
Attachment Tulare Irrigation District request letter
Review / Comment
Edit Department of Water Resources Unreviewed
ESF7 Resources Unreviewed
Tasks
Task
Number ESF Task Lead Task Description Comments Priority Attachments Status Details T 89573 Resources
(ESF07)
Department
of Water
Resources
(DWR)
3860
The City of Visalia are requesting temporary
pumps to deliver water from Kaweah River
System to People's Basin Site from Kaweah
Reservoir release:
Pumps needed tentatively: May through
November
*Peoples Basin: A temporary 24 inch diesel
pump, 40 feet of intake hose, 100 feet of
discharge line, pipe fittings, a pump meter, and a
separate external 400gallon fuel cell. The pump
should be capable of diverting 30CFS.
*Eastside Regional Park: An 18inch diameter
trash pump. The pump should be capable of
diverting 20 CFS.
*The bank of Mill Creek
Field 1: An 18in diameter pump on the north
bank
Field 2: A 12inch diameter pump on the south
bank
The components needed to operate this pump
include the two mentions pumps, 80 feet of
intake hose, 200 feet of discharge line, pipe
fittings, two flowmeters, and two separate
external 400gallon fuel.
cells. (Rented on a monthly basis) The pumps
should be capable of diverting 30 CFS.
05/19/23 0822
EWilder: Please see
the attached resource
request from the
County of Visalia for
additional information.
512
hours =
med
Attachment Coordinating
Edit
View
T 89569 Resources
(ESF07)
Department
of Water
Resources
(DWR)
3860
The Tulare Irrigation District (District or TID)
requests temporary water pumps to be placed in
various locations throughout our district to
provide flood relief, to increase use of surface
water for irrigation, and to increase recharge
demand. Pumps expected to run until 7/15/2023.
•Swall Basin – 125acre recharge basin: Install
two 20 cubic feet per second (cfs) pumps.
•City of Tulare Liberty Stormwater Basin –
Existing stormwater basin: Install a 5 cfs pump.
•Nichols Fallow Field – 35acres provided by
Nichols Farming to increase ground water
recharge: Install a 5 cfs pump and gated pipeline.
•Visser Fallow/Farmed Field – 130acres
provided by Visser Farming: install 5 cfs pump
from VLine Ditch. A Suction pipe will be installed
in the Liberty Ditch where it emerges from a
pipeline and discharge immediately to the east in
the adjacent field.
05/19/23 0824
EWilder: Please see
the attached resource
request from the
County of Tulare for
additional information.
512
hours =
med
Attachment Coordinating
Edit
View
Originated by: [email protected] as Tulare OP AREA LOG Section Chief Originated date: 05/18/2023 09:48:31
Last Edited by: [email protected] as Cal OES SOC OPS Mission Coord Last Edited date: 05/19/2023 08:08:21
For Official Use Only
Return to List Print PDF
Delete
Delete
Request Details
* MASTER: 2023 FebruaryApril Storms
Request Status
Status Coordinating
Mission ID 2023SOC107139
Mission Coordinator Info
Name Elizabeth Wilder
Location SOC
Position MRT
Agency Cal OES
Action Taken
5/19/23 0809 EWilder: Per Joanne Gurrola Pumps will be placed generally in the ag areas around Visalia and Tulare. 5/18/23 1015 JGurrola: New request created to task to DWR for approval under the Temporary Groundwater Improvement program.
IDO/GeoOps/SOC MT notified by email.
Details Requesting Point of Contact
Operational Area Tulare Name Aaron Fukuda
Request Summary Pumps for Water Diversion Project to alleviate flooding in the Tulare Lake Bottom area. Agency Tulare Irrigation District Suggested Source DWR Phone 5597078928
Date/Time Required 05/18/2023 17:00:00 Alternate Phone 5596863425 Date/Time Required Until 07/31/2023 17:00:00
Priority NOW
Resource Request Information
Resource Needed Flood Fight Technical Advisors
Resource Coordinator
Category Resources (EF07)
Detailed Resource
Description
The Tulare Irrigation District (District or TID) requests temporary water pumps to be placed in various locations throughout our district to provide flood relief, to increase use of surface water for irrigation, and to increase recharge demand. By increasing spreading capacity, TID will reduce the amount of water spilled from Lake Kaweah to the Tulare Lake Bottom by approximately 6,800acre feet, which is currently facing significant flooding concerns. The pumps are expected to run from May 15, 2023, to July 15,2023. The 300 mile TID distribution system of canals and ditches traverses in a southwest direction and spills into the Lake Bottom at the southwest corner of our District. We have three spill locations that send water to canal systems that increase flooding potential in the Tulare Lake Bottom. These flood diversions carry out the recent Governors executive orders N423 and N623 to do everything possible to maximize flood diversions. Tulare Irrigation District has exhausted all resources and is unable to procure materials locally for this action. TID ID proposes the following locations for increased diversion and spreading: •Swall Basin – 125acre recharge basin: Install two 20 cubic feet per second (cfs) pumps toincrease the diversion capacity by approximately 20 cfs.
•City of Tulare Liberty Stormwater Basin – Existing stormwater basin: Install a 5 cfs pumpto provide diversion into an existing stormwater basin adjacent to the Liberty Ditch.
•Nichols Fallow Field – 35acres provided by Nichols Farming to increase groundwaterrecharge: Install a 5 cfs pump and gated pipeline to provide recharge on the 35 acres.
•Visser Fallow/Farmed Field – 130acres provided by Visser Farming to increasegroundwater recharge and surface water usage: install 5 cfs pump from VLine Ditch
Quantity Requested 5 Other
Size of Resource
Operator Required No
Fuel Required No
Other Items Required
Resource Delivery Information Delivery Point of Contact Information Street Address 6826 Ave 240 Map Name Aaron Fakuda
Lat / Long / Agency Tulare Irrigation District
Site Type TID Office Location Phone Number 5597078928 Site Name Tulare Irrigation District Alternate Phone 5596863425 Special Instructions Please call Aaron Fukuda (TID) as there will be multiple locations File Attachments
Attachment Visalia DWR request letter
Attachment Tulare Irrigation District request letter
Review / Comment
Edit Department of Water Resources Unreviewed
ESF7 Resources Unreviewed
Tasks
Task
Number ESF Task Lead Task Description Comments Priority Attachments Status Details T 89573 Resources
(ESF07)
Department
of Water
Resources
(DWR)
3860
The City of Visalia are requesting temporary
pumps to deliver water from Kaweah River
System to People's Basin Site from Kaweah
Reservoir release:
Pumps needed tentatively: May through
November
*Peoples Basin: A temporary 24 inch diesel
pump, 40 feet of intake hose, 100 feet of
discharge line, pipe fittings, a pump meter, and a
separate external 400gallon fuel cell. The pump
should be capable of diverting 30CFS.
*Eastside Regional Park: An 18inch diameter
trash pump. The pump should be capable of
diverting 20 CFS.
*The bank of Mill Creek
Field 1: An 18in diameter pump on the north
bank
Field 2: A 12inch diameter pump on the south
bank
The components needed to operate this pump
include the two mentions pumps, 80 feet of
intake hose, 200 feet of discharge line, pipe
fittings, two flowmeters, and two separate
external 400gallon fuel.
cells. (Rented on a monthly basis) The pumps
should be capable of diverting 30 CFS.
05/19/23 0822
EWilder: Please see
the attached resource
request from the
County of Visalia for
additional information.
512
hours =
med
Attachment Coordinating
Edit
View
T 89569 Resources
(ESF07)
Department
of Water
Resources
(DWR)
3860
The Tulare Irrigation District (District or TID)
requests temporary water pumps to be placed in
various locations throughout our district to
provide flood relief, to increase use of surface
water for irrigation, and to increase recharge
demand. Pumps expected to run until 7/15/2023.
•Swall Basin – 125acre recharge basin: Install
two 20 cubic feet per second (cfs) pumps.
•City of Tulare Liberty Stormwater Basin –
Existing stormwater basin: Install a 5 cfs pump.
•Nichols Fallow Field – 35acres provided by
Nichols Farming to increase ground water
recharge: Install a 5 cfs pump and gated pipeline.
•Visser Fallow/Farmed Field – 130acres
provided by Visser Farming: install 5 cfs pump
from VLine Ditch. A Suction pipe will be installed
in the Liberty Ditch where it emerges from a
pipeline and discharge immediately to the east in
the adjacent field.
05/19/23 0824
EWilder: Please see
the attached resource
request from the
County of Tulare for
additional information.
512
hours =
med
Attachment Coordinating
Edit
View
Originated by: [email protected] as Tulare OP AREA LOG Section Chief Originated date: 05/18/2023 09:48:31
Last Edited by: [email protected] as Cal OES SOC OPS Mission Coord Last Edited date: 05/19/2023 08:08:21
For Official Use Only
Return to List Print PDF
Delete
Delete
Request Details
* MASTER: 2023 FebruaryApril Storms
Request Status
Status Coordinating
Mission ID 2023SOC107139
Mission Coordinator Info
Name Elizabeth Wilder
Location SOC
Position MRT
Agency Cal OES
Action Taken
5/19/23 0809 EWilder: Per Joanne Gurrola Pumps will be placed generally in the ag areas around Visalia and Tulare. 5/18/23 1015 JGurrola: New request created to task to DWR for approval under the Temporary Groundwater Improvement program.
IDO/GeoOps/SOC MT notified by email.
Details Requesting Point of Contact
Operational Area Tulare Name Aaron Fukuda
Request Summary Pumps for Water Diversion Project to alleviate flooding in the Tulare Lake Bottom area. Agency Tulare Irrigation District Suggested Source DWR Phone 5597078928
Date/Time Required 05/18/2023 17:00:00 Alternate Phone 5596863425 Date/Time Required Until 07/31/2023 17:00:00
Priority NOW
Resource Request Information
Resource Needed Flood Fight Technical Advisors
Resource Coordinator
Category Resources (EF07)
Detailed Resource
Description
The Tulare Irrigation District (District or TID) requests temporary water pumps to be placed in various locations throughout our district to provide flood relief, to increase use of surface water for irrigation, and to increase recharge demand. By increasing spreading capacity, TID will reduce the amount of water spilled from Lake Kaweah to the Tulare Lake Bottom by approximately 6,800acre feet, which is currently facing significant flooding concerns. The pumps are expected to run from May 15, 2023, to July 15,2023. The 300 mile TID distribution system of canals and ditches traverses in a southwest direction and spills into the Lake Bottom at the southwest corner of our District. We have three spill locations that send water to canal systems that increase flooding potential in the Tulare Lake Bottom. These flood diversions carry out the recent Governors executive orders N423 and N623 to do everything possible to maximize flood diversions. Tulare Irrigation District has exhausted all resources and is unable to procure materials locally for this action. TID ID proposes the following locations for increased diversion and spreading: •Swall Basin – 125acre recharge basin: Install two 20 cubic feet per second (cfs) pumps toincrease the diversion capacity by approximately 20 cfs.
•City of Tulare Liberty Stormwater Basin – Existing stormwater basin: Install a 5 cfs pumpto provide diversion into an existing stormwater basin adjacent to the Liberty Ditch.
•Nichols Fallow Field – 35acres provided by Nichols Farming to increase groundwaterrecharge: Install a 5 cfs pump and gated pipeline to provide recharge on the 35 acres.
•Visser Fallow/Farmed Field – 130acres provided by Visser Farming to increasegroundwater recharge and surface water usage: install 5 cfs pump from VLine Ditch
Quantity Requested 5 Other
Size of Resource
Operator Required No
Fuel Required No
Other Items Required
Resource Delivery Information Delivery Point of Contact Information Street Address 6826 Ave 240 Map Name Aaron Fakuda
Lat / Long / Agency Tulare Irrigation District
Site Type TID Office Location Phone Number 5597078928 Site Name Tulare Irrigation District Alternate Phone 5596863425 Special Instructions Please call Aaron Fukuda (TID) as there will be multiple locations File Attachments
Attachment Visalia DWR request letter
Attachment Tulare Irrigation District request letter
Review / Comment
Edit Department of Water Resources Unreviewed
ESF7 Resources Unreviewed
Tasks
Task
Number ESF Task Lead Task Description Comments Priority Attachments Status Details T 89573 Resources
(ESF07)
Department
of Water
Resources
(DWR)
3860
The City of Visalia are requesting temporary
pumps to deliver water from Kaweah River
System to People's Basin Site from Kaweah
Reservoir release:
Pumps needed tentatively: May through
November
*Peoples Basin: A temporary 24 inch diesel
pump, 40 feet of intake hose, 100 feet of
discharge line, pipe fittings, a pump meter, and a
separate external 400gallon fuel cell. The pump
should be capable of diverting 30CFS.
*Eastside Regional Park: An 18inch diameter
trash pump. The pump should be capable of
diverting 20 CFS.
*The bank of Mill Creek
Field 1: An 18in diameter pump on the north
bank
Field 2: A 12inch diameter pump on the south
bank
The components needed to operate this pump
include the two mentions pumps, 80 feet of
intake hose, 200 feet of discharge line, pipe
fittings, two flowmeters, and two separate
external 400gallon fuel.
cells. (Rented on a monthly basis) The pumps
should be capable of diverting 30 CFS.
05/19/23 0822
EWilder: Please see
the attached resource
request from the
County of Visalia for
additional information.
512
hours =
med
Attachment Coordinating
Edit
View
T 89569 Resources
(ESF07)
Department
of Water
Resources
(DWR)
3860
The Tulare Irrigation District (District or TID)
requests temporary water pumps to be placed in
various locations throughout our district to
provide flood relief, to increase use of surface
water for irrigation, and to increase recharge
demand. Pumps expected to run until 7/15/2023.
•Swall Basin – 125acre recharge basin: Install
two 20 cubic feet per second (cfs) pumps.
•City of Tulare Liberty Stormwater Basin –
Existing stormwater basin: Install a 5 cfs pump.
•Nichols Fallow Field – 35acres provided by
Nichols Farming to increase ground water
recharge: Install a 5 cfs pump and gated pipeline.
•Visser Fallow/Farmed Field – 130acres
provided by Visser Farming: install 5 cfs pump
from VLine Ditch. A Suction pipe will be installed
in the Liberty Ditch where it emerges from a
pipeline and discharge immediately to the east in
the adjacent field.
05/19/23 0824
EWilder: Please see
the attached resource
request from the
County of Tulare for
additional information.
512
hours =
med
Attachment Coordinating
Edit
View
Originated by: [email protected] as Tulare OP AREA LOG Section Chief Originated date: 05/18/2023 09:48:31
Last Edited by: [email protected] as Cal OES SOC OPS Mission Coord Last Edited date: 05/19/2023 08:08:21
For Official Use Only