City of Visalia - Engineering Division
FY 22-23 Measure N Rehab - County Center
RFB No. 22-23-62 - Bid Summary
No. Items Qty Unit Unit Cost Total Unit Cost Total Unit Cost Total Unit C ost Total 1 Mobilization/Demobilization, including final site clean-up 1 LS $90,000.00 $90,000.00 $80,000.00 $80,000.00 $100,000.00 $100,000.00 $212,000.00 $212,000.00 2 Water Pollution Prevention 1 LS $3,000.00 $3,000.00 $1,400.00 $1,4 00.00 $1,800.00 $1,800.00 $1,500.00 $1,500.00 3 Clearing and Grubbing 1 LS $13,000.00 $13,000.00 $20,000.00 $20,00 0.00 $50,000.00 $50,000.00 $65,000.00 $65,000.00 4 Public Outreach 1 LS $1,500.00 $1,500.00 $1,000.00 $1,000.00 $2,000 .00 $2,000.00 $500.00 $500.00 5 Traffic Control 1 LS $50,000.00 $50,000.00 $105,000.00 $105,000.00 $368,700.00 $368,700.00 $100,000.00 $100,000.00 6 Construction Notification Signs 2 EA $3,500.00 $7,000.00 $1,500.0 0 $3,000.00 $1,300.00 $2,600.00 $1,300.00 $2,600.00 7 Remove Concrete Ramp and Adjoining Sidewalk, Curb and Gutter 1 LS $30,000.00 $30,000.00 $22,000.00 $22,000.00 $25,000.00 $25,000.00 $25,000.00 $25,000.00 8 Lower Existing SS Manhole Below Milling Depth 11 EA $800.00 $8,8 00.00 $500.00 $5,500.00 $1,100.00 $12,100.00 $500.00 $5,500.00 9 Lower Existing SD Manhole Below Milling Depth 12 EA $800.00 $9,6 00.00 $500.00 $6,000.00 $1,100.00 $13,200.00 $500.00 $6,000.00 10 Modify Existing Drain Inlet 4 EA $10,000.00 $40,000.00 $4,000.0 0 $16,000.00 $3,200.00 $12,800.00 $4,000.00 $16,000.00 11 Sin gle Modified ADA Ramp with Detectable Surface and Adjoining 8 EA $7,000.00 $56,000.00 $5,400.00 $43,200.00 $3,765.00 $30,120.00 $ 10,000.00 $80,000.00 12 Double Modified ADA Ram p with Detectable Surface and Adjoining 4 EA $12,000.00 $48,000.00 $9,500.00 $38,000.00 $6,413.00 $25,652.00 $20,000.00 $80,000.00 13 Landsca pe Construction Modification 1 LS $5,000.00 $5,000.00 $3,000.00 $3,00 0.00 $17,500.00 $17,500.00 $3,000.00 $3,000.00 14 Cold Mill to Remove As phalt Concrete 126,270 SF $0.50 $63,135.00 $0.20 $25,254.00 $0.35 $44, 194.50 $0.40 $50,508.00 15 Cold Mill to Remove 3" As phalt Concrete 158,600 SF $0.30 $47,580.00 $0.70 $111,020.00 $0.35 $55,510.00 $0.20 $31 ,720.00 16 Pavin g Mat 325,690 SF $0.30 $97,707.00 $0.25 $81,422.50 $0.20 $65,138.00 $0.2 5 $81,422.50 17 Hot Mix As phalt (Type B, 3/4") for 3" Overlay 3,175 TON $113.00 $358,775.00 $122.00 $387,350.00 $98.00 $311,150.00 $ 110.00 $349,250.00 18 Hot Mix As phalt (Type B, 3/4") for 3" Overlay 6,125 TON $113.00 $692,125.00 $110.00 $673,750.00 $98.00 $600,250.00 $ 110.00 $673,750.00 19 Adjust SS Manhole Covers and Boxes to Finish Grade 11 EA $1,20 0.00 $13,200.00 $1,000.00 $11,000.00 $1,200.00 $13,200.00 $1,200.00 $1 3,200.00 20 Adjust SD Manhole Covers and Boxes to Finish Grade 12 EA $1,20 0.00 $14,400.00 $1,000.00 $12,000.00 $1,200.00 $14,400.00 $1,200.00 $1 4,400.00 21 Signage, Striping and Pavement Markings 1 LS $75,000.00 $75,000 .00 $86,000.00 $86,000.00 $152,000.00 $152,000.00 $131,000.00 $131,00 0.00 22 Raised Pavement Markers 1 LS $5,000.00 $5,000.00 $5,800.00 $5,800 .00 $3,500.00 $3,500.00 $5,800.00 $5,800.00 23 Flexible Delineator Posts 555 EA $200.00 $111,000.00 $206.00 $114, 330.00 $115.00 $63,825.00 $216.00 $119,880.00 24 Green Paint 4,100 SQFT $14.00 $57,400.00 $16.00 $65,600.00 $8.50 $34 ,850.00 $11.00 $45,100.00 25 Rumble Strips 650 LF $10.00 $6,500.00 $18.00 $11,700.00 $15.00 $9,750 .00 $10.00 $6,500.00 26 Survey Monuments 6 EA $900.00 $5,400.00 $600.00 $3,600.00 $1,000.00 $ 6,000.00 $2,500.00 $15,000.00 $1,909,122.00 $1,932,926.50 $2,035,239.50 $2,134,630.50 No. Items Qty Unit Unit Cost Total Unit Cost Total Unit Cost Total Unit C ost Total 1 Mobilization/Demobilization, including final site clean-up 1 LS $90,000.00 $90,000.00 $90,000.00 $90,000.00 $110,000.00 $110,000.00 $235,000.00 $235,000.00 2 Water Pollution Prevention 1 LS $3,000.00 $3,000.00 $4,000.00 $4,0 00.00 $1,800.00 $1,800.00 $1,500.00 $1,500.00 3 Clearing and Grubbing 1 LS $13,000.00 $13,000.00 $62,000.00 $62,00 0.00 $50,000.00 $50,000.00 $65,000.00 $65,000.00 4 Public Outreach 1 LS $1,500.00 $1,500.00 $1,000.00 $1,000.00 $2,000 .00 $2,000.00 $500.00 $500.00 5 Traffic Control 1 LS $46,500.00 $46,500.00 $90,000.00 $90,000.00 $3 36,400.00 $336,400.00 $100,000.00 $100,000.00 6 Construction Notification Signs 2 EA $3,500.00 $7,000.00 $1,500.0 0 $3,000.00 $1,300.00 $2,600.00 $1,300.00 $2,600.00 7 Remove Concrete Ramp and Adjoining Sidewalk, Curb and Gutter 1 LS $30,000.00 $30,000.00 $22,000.00 $22,000.00 $25,000.00 $25,000.00 $25,000.00 $25,000.00 8 Lower Existing SS Manhole Below Milling Depth 11 EA $800.00 $8,8 00.00 $500.00 $5,500.00 $1,100.00 $12,100.00 $500.00 $5,500.00 9 Lower Existing SD Manhole Below Milling Depth 12 EA $800.00 $9,6 00.00 $500.00 $6,000.00 $1,100.00 $13,200.00 $500.00 $6,000.00 10 Modif y Existing Drain Inlet 4 EA $10,000.00 $40,000.00 $4,000.00 $16,000.00 $3,200. 00 $12,800.00 $4,000.00 $16,000.00 11 Single Modified ADA Ramp with Detectable Surface and Adjoinin g S 8 EA $7,000.00 $56,000.00 $5,400.00 $43,200.00 $3,765.00 $30,120. 00 $10,000.00 $80,000.00 12 Double Modified ADA Ram p with Detectable Surface and Adjoining 4 EA $12,000.00 $48,000.00 $9,500.00 $38,000.00 $6,413.00 $25,652.00 $20,000.00 $80,000.00 13 Landscape Construction Modification 1 LS $5,000.00 $5,000.00 $3, 000.00 $3,000.00 $17,500.00 $17,500.00 $3,000.00 $3,000.00 14 Cold Mill to Remove Asphalt Concrete and Aggregate Base 325,69 0 SF $0.40 $130,276.00 $0.50 $162,845.00 $0.40 $130,276.00 $0.30 $97,7 07.00 15 Proof Roll 325,690 SF $0.10 $32,569.00 $0.10 $32,569.00 $0.01 $3,256 .90 $0.25 $81,422.50 16 Paving Mat 325,690 SF $0.30 $97,707.00 $0.25 $81,422.50 $0.20 $65,1 38.00 $0.25 $81,422.50 17 Additional Class 2 AB (If required, 5% assumed) 855 TON $42.00 $3 5,910.00 $59.00 $50,445.00 $42.00 $35,910.00 $30.00 $25,650.00 18 Hot Mix Asphalt (Type B, 3/4") for 6" Overlay 13,030 TON $105. 00 $1,368,150.00 $107.00 $1,394,210.00 $98.00 $1,276,940.00 $105.00 $1 ,368,150.00 19 Adjust SS Manhole Covers and Boxes to Finish Grade 11 EA $1,20 0.00 $13,200.00 $1,000.00 $11,000.00 $1,200.00 $13,200.00 $1,200.00 $1 3,200.00 20 Adjust SD Manhole Covers and Boxes to Finish Grade 12 EA $1,20 0.00 $14,400.00 $1,000.00 $12,000.00 $1,200.00 $14,400.00 $1,200.00 $1 4,400.00 21 Striping and Pavement Markings 1 LS $26,000.00 $26,000.00 $95,00 0.00 $95,000.00 $87,450.00 $87,450.00 $46,000.00 $46,000.00 22 Raised Pavement Markers 1 LS $5,000.00 $5,000.00 $5,800.00 $5,800 .00 $3,500.00 $3,500.00 $4,200.00 $4,200.00 23 Survey Monuments 6 EA $900.00 $5,400.00 $600.00 $3,600.00 $1,000.00 $ 6,000.00 $2,500.00 $15,000.00 $2,087,012.00 $2,232,591.50 $2,275,242.90 $2,367,252.00 $1,909,122.00 $1,932,926.50 $2,035,239.50 $2,134,630.50 $2,087,012.00 $2 ,232,591.50 $2 ,275,242.90 $2 ,367,252.00Base Bid B Total Base Bid A Total
BASE BID A : County Center Street Travel Lane Replacement with Protected Intersection
BASE BID B: County Center Street Full Depth Replacement Avison Construction, Inc.
Madera, CA
Avison Construction, Inc.
Madera, CA
BASE BID A TOTAL
BASE BID B TOTAL
Agee Construction
Clovis, CA
Agee Construction
Clovis, CA
Granite Construction
Fresno, CA
Granite Construction
Fresno, CA
Cal Valley Construction
Fresno, CA
Cal Valley Construction
Fresno, CA
1 of 1 9/5/2023