RFB No.: 23-24-06
Project Name: ADA Pathway Improvements from Main Street to Transit Center Project No.: 6110-72000/CP0420-999
Item No. Description Quantity Units
Unit Cost Total
1 Mobilization and Demobilization 1 LS $15,000.00 $15,000.00 2 Prepare and Maintain Pedestrian and Traffic Control Plan(s) 1 LS $4,500.00 $4,500.00 3 Dust Control 1 LS $500.00 $500.00
4 Construction Notification Signs 2 EA $1,500.00 $3,000.00 5 Storm Water Pollution Prevention 1 LS $1,500.00 $1,500.00 6 Remove and Dispose of Existing Concrete 3,800 SF $5.00 $19,000.00 7 Clearing, Grubbing and Demolition 1 LS $31,460.00 $31,460.00 8 Install City Std C-33 ADA Compliant Detectable Warning Surface 485 SF $53.00 $25,705.00 9 Construct City Std C-8 Curb 35 LF $74.00 $2,590.00
10 Construct 4” Thick Concrete 4,721 SF $18.00 $84,978.00 11 Construct City Std C-23 Drive Approach 1 EA $7,300.00 $7,300.00 12 Construct City Std C-24 Drive Approach 2 EA $8,600.00 $17,200.00 13 Construct City Std C-7 Vee Gutter 15 LF $126.00 $1,890.00 14 Install Full Depth Asphalt Concrete Plug 38 TON $424.00 $16,112.00 15 Install City Std P-20 Alley Pavement Paving Section 247 SF $85.00 $20,995.00 16 Install City Std P-20 Alley Concrete Section 35 SF $70.00 $2,450.00 17 Furnish and Construct Tree Well with Tree Grate 12 EA $4,210.00 $50,520.00 18 Remove Existing Storm Drain Inlet 1 EA $5,250.00 $5,250.00 19 Construct City Std GO Storm Drain Inlet 1 EA $7,800.00 $7,800.00 20 Signing, Striping and Pavement Modifications 1 LS $2,500.00 $2,500.00 21 Repair Landscape and Irrigation In-Kind 1 LS $14,000.00 $14,000.00 JT2 Inc. DBA Todd Companies
Lump Sum Total: $334,250.00
CP0420 Bid Results
Visalia City Council
November 20, 2023
- Document
- CP0420 Bid Results
- Meeting
- November 20, 2023
- Body
- Visalia City Council
- Original file
- 112 KB
Text extracted from the city's file for reading and search. Open the original on visalia.legistar1.com. That file is the official record.