CALDWELL AVE.
36 18
24 15
48 12
30 6
12 12
18 12
12 18
18 12
2415
12 15
12 12
15 15
12 24
18 12
12 12
12 24
Ave 280
Rd
1 48
Ave 288
S
M
c Aul
iff St
S Si
mon S
t
E Harter Ave
E Mary Ave
E Beech Ct
S Grand
St
E Laura Ave
E Evergreen Ave
S Man
zanita
C
t

CAMERON
TULARE IRRI. DIST.

DITCH
Cameron Creek Check Structures
±
1 inch = 1,000 feet
Legend

RAILROAD

WATERWAYS

STORM MAIN

FORCED MAIN
PROJECT LOCATION*
*Final check structure locations will be determined in the design/engineering phase