Visalia Water
Reclamation
Facility
Facility Plan Update
Council Presentation
City of Visalia
2/20/2024

Background and Purpose
CAROLLO / 3
updatefooter0323.pptx/3updatefooter0323.pptx/3
WRF Overview

CAROLLO / 4
updatefooter0323.pptx/4updatefooter0323.pptx/4
T reatment Photos

CAROLLO / 5
updatefooter0323.pptx/5updatefooter0323.pptx/5
Project Background and Severity
• The WRF was upgraded in 2017 due to
increased regulations
• Improvements were made for a rated capacity
of 22 mgd, however to save costs some
improvements were not implemented leaving
the total design capacity at 18 mgd.
• In recent years, increased industrial loads along
with water conservation efforts have increased
influent wastewater concentrations and as a
result put increased strains on the facility.
• This study is an effort to update current
treatment process capacities using a biological
process model.

T reatment Process
Performance
CAROLLO / 7
updatefooter0323.pptx/7updatefooter0323.pptx/7
Solids Handling Facilities are Struggling
• Digesters are operating at very low HRTs and
are currently being overloaded during peak
loading periods
• PS and TWAS pumping is limited to 2-3%,
which exacerbates HRT limitation
• Digesters are overloaded with Grit causing
reduced volume (est 20% by volume filled)
• City does not have sufficient redundancy with
dewatering equipment due to no standby
dewatering screw press
CAROLLO / 8
updatefooter0323.pptx/8updatefooter0323.pptx/8
Historical Influent Data

CAROLLO / 9
updatefooter0323.pptx/9updatefooter0323.pptx/9
Biological Oxygen Demand and T otal
Suspended Solids Loadings

CAROLLO / 10
updatefooter0323.pptx/10updatefooter0323.pptx/10
Capacity/Firm Capacity Analysis

CAROLLO / 11
updatefooter0323.pptx/11updatefooter0323.pptx/11
Process Area Capacity

CAROLLO / 12
updatefooter0323.pptx/12updatefooter0323.pptx/12
Sludge Flows & Dewatering Capacity
Rated Screw Press Capacity (x1) – 158,400 gpd
Rated Screw Press Capacity (x2) – 316,800 gpd
CAROLLO / 13
updatefooter0323.pptx/13updatefooter0323.pptx/13
Impact of higher feed concentration (4.5%) on Digester SRT Minimum recommended
HRT of 15 days
Condition Assessment
CAROLLO / 15
updatefooter0323.pptx/15updatefooter0323.pptx/15
Condition Assessment Findings
• In general the equipment at the WRF is in good condition • There were significant upgrades in the last improvement project and all of this equipment is in good condition
• The following areas need some attention:
»Headworks
»Digesters
»Sludge Drying beds
»Misc. piping/pumps/valves
CAROLLO / 16
updatefooter0323.pptx/16updatefooter0323.pptx/16
Site Photos

Environmental Opportunities
CAROLLO / 18
updatefooter0323.pptx/18updatefooter0323.pptx/18
Environmental Opportunities
• Engine Generators
• Microturbines
• Gas Turbines
• Fuel Cells
• RNG to Pipeline Injection
• R-CNG to Vehicle Fuel

Near-T erm Improvements
CAROLLO / 20
updatefooter0323.pptx/20updatefooter0323.pptx/20
Near-term capacity related projects
•Now:
»Replace PS and TWAS pumps to allow
thickening of the sludge more
−Goal: 3% PS and 6% TWAS
»Add one screw press for firm
capacity/redundancy
»Add one digester with same capacity
as Digester No. 8
»Add additional UV Bank to provide
firm capacity/redundancy
Summary and
Recommendations
CAROLLO / 22
updatefooter0323.pptx/22updatefooter0323.pptx/22
Immediate Recommendations for Digesters
• Place Dig No. 4 back in service (waiting on piping)
• Continue tracking digester health parameters and develop response plan for early signs of failure
• Clean/de-grit digesters that have not been cleaned recently (i.e. last 2-4 years)
• PS and TWAS pumping modifications and/or replace discharge piping • Re-purpose Dig #8 as a primary digester (Currently used as 70% storage)
• Additional digester volume likely needed to accommodate future growth to buildout
CAROLLO / 23
updatefooter0323.pptx/23updatefooter0323.pptx/23
Solids Handling Improvements

CAROLLO / 24
updatefooter0323.pptx/24updatefooter0323.pptx/24
TWAS Pumps
•Now:
»Replace PS and TWAS pumps to allow
thickening of the sludge more
−Goal: 3% PS and 6% TWAS
»Add two screw presses
»Add three digesters with same
capacity as Digester No. 8

CAROLLO / 25
updatefooter0323.pptx/25updatefooter0323.pptx/25
TWAS Pump Station Upgrades

CAROLLO / 26
updatefooter0323.pptx/26updatefooter0323.pptx/26
Digester Upgrades

CAROLLO / 27
updatefooter0323.pptx/27updatefooter0323.pptx/27
Digester Upgrades

CAROLLO / 28
updatefooter0323.pptx/28updatefooter0323.pptx/28
Near T erm Dewatering Recommendations
• Additional dewatering unit needed to provide
redundancy/standby
• Provide additional drying beds and sludge storage if
dewatering maintenance or down time is experienced
CAROLLO / 29
updatefooter0323.pptx/29updatefooter0323.pptx/29
Dewatering Unit
• Add photo and potential layout

CAROLLO / 30
updatefooter0323.pptx/30updatefooter0323.pptx/30
Screw Press

CAROLLO / 31
updatefooter0323.pptx/31updatefooter0323.pptx/31
Sludge Drying Beds
SLUDGE
DRYING
BEDS
CAROLLO / 32
updatefooter0323.pptx/32updatefooter0323.pptx/32
Digester Sludge Holding Pond
Digester
Sludge
Holding
Pond
CAROLLO / 33
updatefooter0323.pptx/33updatefooter0323.pptx/33
Digester Sludge Holding Pond

CAROLLO / 34
updatefooter0323.pptx/34updatefooter0323.pptx/34
Near T erm UV Recommendations
• Additional UV bank unit needed to provide
redundancy/standby