Cities Index.
Cummins Proposal

Visalia City Council
May 6, 2024

Document
Cummins Proposal
Meeting
May 6, 2024
Body
Visalia City Council
Pages
3
Original file
287 KB
Text extracted from the city's file for reading and search. Open the original on visalia.legistar1.com. That file is the official record.
Page 1 of 3 ends

cummins.com
Confidential

CUMMINS INC

INTEGRATED GAS BUSINESS
April 8, 2024

Proposal
Adder02_12062023_Rev3_City of Visalia

Pre-commissioning Repairs
Adder 02

Page 2 of 3 ends

cummins.com
Confidential

April 8, 2024
Mike Porter
City of Visalia
Email: [email protected]
Re: Pre-commissioning Repairs
Quote: Adder02_12062023_Rev3_City of Visalia

1) Preferred Gas Blending system
Replacement of the following parts with visible wear due to storage conditions:

QPX1C/K15ASC Pneumatic Actuators
• Visible fading on casing with possible rust showing through. Soft diaphragm may be dried out due to weather conditions.
• Replacement QPX1C/K15ASC actuator due to external rust showing on casing.

VAC BLX Series V100EEXD190AC1 Electro-Pneumatic Positioner • Visible fading on positioner case due to weather. Gauge block is rusted and unable to see measurements.
• VAC BLX V100-E-EX-D1-90-A-C1 replacement positioner & 400499 filter regulator with gauge set.

StoneL QX7VB02SDM Limit Switch with Position Transmitter • Visible fading of paint on outside of unit.
• Complete replacement unit, current model has been updated to QX5VE02SRA. No change in fit or function.

Sub-total of parts : $118,900.00
(sales taxes) : $ 10,106.50
Sub-total of service : $ 17,800.00
Sum of Gas Blending system : $ 146,806.50

2) Switchgear and Master Control
Perform preventive maintenance on the switchgear and master control, investigate issues with the fiber optics and with the ground meter, identify and land the electricians interconnects running into the switchgear and update the firmware of the PLC and HMI.

Parts to be supplied:
• Red Lion protocol convertor
• RS-232 to RS-485 convertor for MOD bus communications to the generator NETA testing on the protection relays and battery testing are NOT included in this quote and are to be done by a third party.

Sub-total of parts : $ 2,500.00
(sales taxes) : $ 212.50
Sub-total of service : $ 47,100.00
Sum of Switchgear : $ 49,812.50

Page 3 of 3 ends

cummins.com
Confidential

Price for the above listed herein: $196,619.00 USD total. Taxes included.

In acceptance of this proposal, please issue Purchase Order to:

Augusto Lange Tubino
Proposal Adder02_12062023_Rev3_City of Visalia
Cummins Inc. d/b/a CSSNA IGB
435 Bergen Ave
Kearny, NJ 07032
United States of America

Payment Terms:
• 100% upon receipt of order
• Payments are due sixty (30) days from the date of invoice contingent on credit approval.

Sincerely,
Augusto Tubino
Gas Genset Sales Manager – Western
Cummins Inc.

Email: [email protected]
Mobile: +1 (812) 390 9381

← All documents from this meeting