DRAFT
Environmental Impact Report
Shirk and Riggin Industrial Project
City of Visalia, Tulare County, California
State Clearinghouse Number 2022080658
Prepared for:
City of Visalia
315 E. Acequia Avenue
Visalia, CA 93291
559.713.4636
Contact: Brandon Smith, Principal Planner
Prepared by:
FirstCarbon Solutions
7726 N. First Street, #413
Fresno, CA 93720
714.508.4100
Contact: Mary Bean, Project Director
Yael Marcus, Project Manager
Date: April 11, 2024
THIS PAGE INTENTIONALLY LEFT BLANK
City of Visalia—Shirk and Riggin Industrial Project
Draft EIR Table of Contents
iii
Table of Contents
Acronyms and Abbreviations ......................................................................................................... ix Executive Summary ................................................................................................................... ES-1 Chapter 1: Introduction ............................................................................................................... 1-1
1.1 - Overview of the CEQA Process ....................................................................................... 1-1
1.2 - Scope of the EIR .............................................................................................................. 1-2
1.3 - Organization of the Draft EIR .......................................................................................... 1-4
1.4 - Documents Incorporated by Reference .......................................................................... 1-7
1.5 - Review of the Draft EIR ................................................................................................... 1-8 Chapter 2: Project Description .................................................................................................... 2-1
2.1 - Overview ........................................................................................................................ 2-1
2.2 - Project Location and Setting........................................................................................... 2-1
2.3 - Environmental Setting .................................................................................................... 2-2
2.4 - Project Objectives ........................................................................................................... 2-4
2.5 - Project Description ......................................................................................................... 2-5
2.6 - Required Actions and Approvals .................................................................................. 2-11 Chapter 3: Environmental Impact Analysis .................................................................................. 3-1
3.1 - Aesthetics, Light, and Glare ......................................................................................... 3.1-1
3.2 - Agricultural Resources and Forestry Resources .......................................................... 3.2-1
3.3 - Air Quality .................................................................................................................... 3.3-1
3.4 - Biological Resources .................................................................................................... 3.4-1
3.5 - Cultural Resources and Tribal Cultural Resources ....................................................... 3.5-1
3.6 - Energy .......................................................................................................................... 3.6-1
3.7 - Geology, Soils, and Seismicity ...................................................................................... 3.7-1
3.8 - Greenhouse Gas Emissions ......................................................................................... 3.8-1
3.9 - Hazards and Hazardous Materials ............................................................................... 3.9-1
3.10 - Hydrology and Water Quality .................................................................................. 3.10-1
3.11 - Land Use and Planning ............................................................................................ 3.11-1
3.12 - Noise ........................................................................................................................ 3.12-1
3.13 - Public Services ......................................................................................................... 3.13-1
3.14 - Transportation ......................................................................................................... 3.14-1
3.15 - Utilities and Service Systems ................................................................................... 3.15-1
3.16 - Wildfire .................................................................................................................... 3.16-1 Chapter 4: Effects Found Not To Be Significant ............................................................................ 4-1
4.1 - Introduction .................................................................................................................... 4-1
4.2 - Environmental Effects Found Not To Be Significant ....................................................... 4-1 Chapter 5: Other CEQA Considerations ........................................................................................ 5-1
5.1 - Significant Unavoidable Impacts .................................................................................... 5-1
5.2 - Growth-inducing Impacts ............................................................................................... 5-3
5.3 - Significant Irreversible Environmental Changes ............................................................. 5-5 Chapter 6: Alternatives to the Proposed Project .......................................................................... 6-1
6.1 - Introduction .................................................................................................................... 6-1
6.2 - Alternative Eliminated from Further Consideration ....................................................... 6-4
6.3 - Project Objectives ........................................................................................................... 6-5
6.4 - Alternative 1—No Project Alternative ............................................................................ 6-6 City of Visalia—Shirk and Riggin Industrial Project
Table of Contents Draft EIR
iv
6.5 - Alternative 2—Reduced Footprint Alternative ............................................................ 6-12
6.6 - Alternative 3—Alternative Location ............................................................................ 6-20
6.7 - Environmentally Superior Alternative .......................................................................... 6-28 Chapter 7: Persons and Organizations Consulted/List of Preparers .............................................. 7-1
7.1 - Persons and Organizations Consulted ............................................................................ 7-1
7.2 - Project Sponsor and Project Consultants....................................................................... 7-1
7.3 - City of Visalia Consultants .............................................................................................. 7-2
List of Appendices
Appendix A: EIR Public Involvement (NOP , EIR Public Scoping Comments) Appendix B: Air Quality, Greenhouse Gas, and Energy Supporting Information Appendix C: Biological Resources Supporting Information C.1 - Biological Resources Assessment
C.2 - Jurisdictional Delineation
Appendix D: Cultural and Tribal Cultural Resources Supporting Information Appendix E: Geology and Soils Supporting Information
E.1 - Geotechnical Evaluation
E.2 - Paleontological Records Search
Appendix F: Hazards and Hazardous Materials Supporting Information F.1 - Phase I Environmental Site Assessment
F.2 - Limited Phase II Environmental Site Assessment
Appendix G: Agricultural Resources and Forestry Supporting Information G.1 - Land Evaluation and Site Assessment Model
G.2 - Cancellation of Williamson Act Contract
Appendix H: Noise Supporting Information
Appendix I: Transportation Supporting Information
Appendix J: Water Supply Assessment
Appendix K: Aesthetics Supporting Information
List of Tables
Table ES-1: Executive Summary Matrix .............................................................................................. ES-8 Table 1-1: NOP Comment Letters ........................................................................................................ 1-3 Table 2-1: Development Summary ...................................................................................................... 2-6 Table 2-2: Required and Proposed Parking ......................................................................................... 2-8 Table 3-1: Cumulative Projects ............................................................................................................ 3-5 Table 3.3-1: Description of Toxic Air Contaminants of National and California Concern ................. 3.3-5 Table 3.3-2: San Joaquin Valley Air Basin Attainment Status ......................................................... 3.3-13 Table 3.3-3: Air Quality Monitoring Summary ............................................................................... 3.3-14 City of Visalia—Shirk and Riggin Industrial Project
Draft EIR Table of Contents
v
Table 3.3-4: Air Quality Index and Health Effects from Ozone ....................................................... 3.3-15 Table 3.3-5: Air Quality Index and Health Effects of Particulate Pollution ..................................... 3.3-17 Table 3.3-6: Conceptual Construction Schedule ............................................................................. 3.3-31 Table 3.3-7: Project Construction Equipment Assumptions ........................................................... 3.3-32 Table 3.3-8: Construction Off-site Trips .......................................................................................... 3.3-33 Table 3.3-9: Vehicle Trip Generation During Operations ................................................................ 3.3-35 Table 3.3-10: Vehicle Type Classification–Individual Project Runs ................................................. 3.3-36 Table 3.3-11: Summary of Operational Diesel Emission Source Configurations ............................ 3.3-38 Table 3.3-12: Categories of Emissions at Retail Gasoline Service Stations .................................... 3.3-39 Table 3.3-13: Construction Air Pollutant Emissions (Unmitigated) ................................................ 3.3-45 Table 3.3-14: Construction Air Pollutant Emissions (Mitigated) ..................................................... 3.3-48 Table 3.3-15: Operational Air Pollutant Emissions (Unmitigated) .................................................. 3.3-50 Table 3.3-16: Maximum On-site Daily Air Pollutant Emissions During Construction (Unmitigated) .............................................................................................................. 3.3-54 Table 3.3-17: Maximum On-site Daily Air Pollutant Emissions During Construction (Mitigated) .................................................................................................................. 3.3-55 Table 3.3-18: Maximum On-site Daily Air Pollutant Emissions During Operations (Unmitigated) .............................................................................................................. 3.3-56 Table 3.3-19: Estimated Health Risks and Hazards During Project Construction (Mitigated)–Reasonable Scenario ............................................................................... 3.3-66 Table 3.3-20: Estimated Health Risks and Hazards During Project Construction (Mitigated)–Worst-Case/Concurrent Construction Scenario ...................................... 3.3-66 Table 3.3-21: Estimated Health Risks and Hazards During Project Operation (Unmitigated) at the MIR ............................................................................................ 3.3-67 Table 3.3-22: Cumulative Health Risks and Hazards During Reasonable Construction (Mitigated) and Operation (Unmitigated) at the MIR ................................................. 3.3-68 Table 3.3-23: Screening Levels for Potential Odor Sources ............................................................ 3.3-69 Table 3.4-1: Soil Types Present within Project Site ........................................................................... 3.4-2 Table 3.5-1: Cultural Resources within 0.5-mile of the Project Site ................................................. 3.5-6 Table 3.5-2: Previous Investigations within 0.5-mile of the Project Site .......................................... 3.5-7 Table 3.6-1: Estimated Annual Project Energy Consumption ......................................................... 3.6-10 Table 3.8-1: Description of Greenhouse Gases ................................................................................ 3.8-2 Table 3.8-2: City of Visalia 2005 Community GHG Emissions Baseline Inventory by Sector ............ 3.8-6 Table 3.8-3: Construction Greenhouse Gas Emissions (Mitigation Included) ................................ 3.8-32 Table 3.8-4: Summary of Applicable Greenhouse Gas Regulations ................................................ 3.8-34 Table 3.8-5: Consistency with City of Visalia’s CAP ......................................................................... 3.8-36 City of Visalia—Shirk and Riggin Industrial Project
Table of Contents Draft EIR
vi
Table 3.8-6: Consistency with SB 32 2017 Scoping Plan Update .................................................... 3.8-44 Table 3.8-7: Consistency with 2022 Scoping Plan Update ............................................................. 3.8-48 Table 3.9-1: Project Site Hazardous Materials Search Results ......................................................... 3.9-4 Table 3.9-2: Summary of Off-site Facilities of Potential Concern ..................................................... 3.9-5 Table 3.10-1: Public Water Systems ............................................................................................. 3.10-15 Table 3.10-2: Operational Project Water Demands ..................................................................... 3.10-15 Table 3.10-3: Cal Water Visalia District Retail Water Supplies ..................................................... 3.10-18 Table 3.10-4: Total Project Demands by Year ............................................................................... 3.10-19 Table 3.11-1: LAFCo Consistency Analysis (Government Code § 56668) ..................................... 3.11-17 Table 3.11-2: General Plan Consistency Analysis ......................................................................... 3.11-24 Table 3.12-1: Sound Terminology ................................................................................................... 3.12-2 Table 3.12-2: Typical Construction Equipment Maximum Noise Levels ........................................ 3.12-4 Table 3.12-3: Vibration Levels of Construction Equipment ............................................................ 3.12-6 Table 3.12-4: Existing Traffic Noise Levels ...................................................................................... 3.12-9 Table 3.12-5: Federal Transit Administration Construction Vibration Impact Criteria ................. 3.12-11 Table 3.12-6: Unmitigated Construction Noise Levels–Grading ................................................... 3.12-20 Table 3.12-7: Traffic Noise Increase Summary–Existing Conditions ............................................ 3.12-22 Table 3.12-8 Traffic Noise Increase Summary–Future Conditions ............................................... 3.12-23 Table 3.12-9: Parking Lot Activities Noise Levels ......................................................................... 3.12-25 Table 3.12-10: Drive-through Car Wash Noise Levels .................................................................. 3.12-27 Table 3.14-1: Study Intersections ................................................................................................... 3.14-3 Table 3.14-2: Signalized and Unsignalized Intersection LOS Criteria ............................................. 3.14-4 Table 3.14-3: Existing Transit Service ............................................................................................. 3.14-7 Table 3.14-4: Trip Generation Summary ...................................................................................... 3.14-25 Table 3.15-1: Groundwater Volume Pumped ................................................................................ 3.15-3 Table 3.15-2: Use for Potable and Nonpotable Water–Projected .................................................. 3.15-4 Table 3.15-3: Normal Year Supply and Demand Comparison ........................................................ 3.15-5 Table 3.15-4: Single Dry Year Supply and Demand Comparison .................................................... 3.15-5 Table 3.15-5: Multiple Dry Years Supply and Demand Comparison .............................................. 3.15-5 Table 3.15-6: Disposal Site Capacity ............................................................................................... 3.15-8 Table 3.15-7: Electricity Consumption in Tulare County 2011–2021 ............................................. 3.15-9 Table 3.15-8: Natural Gas Consumption in Tulare County 2011–2021 ........................................ 3.15-10 Table 6-1: Summary of Alternatives .................................................................................................. 6-28
City of Visalia—Shirk and Riggin Industrial Project
Draft EIR Table of Contents
vii
List of Exhibits
Exhibit 2-1: Regional Location Map ................................................................................................... 2-13 Exhibit 2-2: Local Vicinity Map .......................................................................................................... 2-15 Exhibit 2-3: City of Visalia Urban Growth Boundary ......................................................................... 2-17 Exhibit 2-4: Existing Setting ............................................................................................................... 2-19 Exhibit 2-5a: Site Photographs .......................................................................................................... 2-21 Exhibit 2-6: County of Tulare Zoning Designation ............................................................................. 2-25 Exhibit 2-7: City of Visalia General Plan Designations ....................................................................... 2-27 Exhibit 2-8: Site Plan .......................................................................................................................... 2-29 Exhibit 2-9: Project Simulation .......................................................................................................... 2-31 Exhibit 2-10a: Industrial Building Elevation Plans ............................................................................. 2-33 Exhibit 2-11: Street Dedication .......................................................................................................... 2-37 Exhibit 2-12: Site Photometric Plan ................................................................................................... 2-39 Exhibit 2-13: Proposed Water Lines .................................................................................................. 2-41 Exhibit 2-14: Proposed Sewer Lines .................................................................................................. 2-43 Exhibit 2-15: Proposed Storm Drainage System ................................................................................ 2-45 Exhibit 2-16: Project Phasing ............................................................................................................. 2-47 Exhibit 3-1: Cumulative Projects Map ................................................................................................. 3-7 Exhibit 3.2-1: Important Farmland Map ......................................................................................... 3.2-19 Exhibit 3.4-1: Land Cover and Vegetation ...................................................................................... 3.4-37 Exhibit 3.4-2: Impacts on Biological Resources .............................................................................. 3.4-39 Exhibit 3.7-1: Regional Earthquake Fault Map ............................................................................... 3.7-23 Exhibit 6-1: Project Alternatives–Site Boundary ............................................................................... 6-31
List of Figures
Figure 1: San Joaquin Valley NOx Emissions Forecast ..................................................................... 3.3-24 Figure 3.8-1: U.S. Greenhouse Gas Emissions Allocated to Economic Sectors (1990-2020) ............ 3.8-5 Figure 3.8-2: 2020 California Greenhouse Gas Emissions by Sector ................................................ 3.8-6 Figure 3.8-3: California’s Path to Achieving the 2050 Target .......................................................... 3.8-43 Figure 3.12-1: Visalia General Plan–Transportation Noise Sources .............................................. 3.12-14 Figure 3.12-2: Visalia General Plan–Stationary Noise Sources ..................................................... 3.12-15 Figure 3.12-3: Section 8.36.040 Exterior Noise Standards for Fixed Noise Sources ..................... 3.12-15 Figure 3.12-4: Section 8.36.060 Residential Interior Noise Standards ......................................... 3.12-16
THIS PAGE INTENTIONALLY LEFT BLANK
City of Visalia—Shirk and Riggin Industrial Project
Draft EIR Acronyms and Abbreviations
ix
ACRONYMS AND ABBREVIATIONS
°C degrees Celsius (Centigrade)
°F degrees Fahrenheit
µg/m3 micrograms per cubic meter
AAQS Ambient Air Quality Standards
AB Assembly Bill
ABAG Association of Bay Area Governments
ACEP Agricultural Conservation Easement Program
ACHP Advisory Council on Historic Preservation
ACM asbestos-containing material
ACP Alternative Compliance Plan
ACS American Community Survey
ADA Americans with Disabilities Act
ADT Average Daily Traffic
AFY acre-feet per year
AIA Airport Influence Area
AIC Archaeological Information Center
AICUZ Air Installation Compatibility Use Zone
Air Basin San Joaquin Valley Air Basin
AIRFA American Indian Religious Freedom Act
ALUC Airport Land Use Commission
ALUCP Airport Land Use Compatibility Plan
AMSL above mean seal level
APCD Air Pollution Control District
APE Area of Potential Effect
APN Assessor’s Parcel Number
AQMD Air Quality Management District
ARB California Air Resources Board
ARPA Archaeological Resources Protection Act
AST aboveground storage tank
ATCM Airborne Toxic Control Measures
ATP Active Transportation Plan
BAAQMD Bay Area Air Quality Management District
BART Bay Area Rapid Transit
BAU business-as-usual
BCF billion cubic feet
City of Visalia—Shirk and Riggin Industrial Project
Acronyms and Abbreviations Draft EIR
x
BCF/year billion cubic feet per year
BERD Built Environment Resource Directory
BGS below ground surface
BMP Best Management Practice
BP Before Present
BTU British Thermal Unit
BVOC biogenic volatile organic compound
C2ES Center for Climate and Energy Solution
CAAQS California Ambient Air Quality Standards
CAFE Corporate Average Fuel Economy
CalEEMod California Emissions Estimator Model
Cal/EPA California Environmental Protection Agency
CAL FIRE California Department of Forestry and Fire Protection CalGEM California Department of Conservation Geologic Energy Management Cal/OSHA California Occupational Health and Safety Administration Caltrans California Department of Transportation
Cal Water California Water Service
CAP Climate Action Plan
CAPCOA California Air Pollution Control Officers Association CBC California Building Standards Code
CCAP Climate Change Action Plan
CCCC California Climate Change Center
CCR California Code of Regulations
CCS Carbon Capture and Storage
CDF California Department of Finance
CDFW California Department of Fish and Wildlife
CDP Census Designated Places
CDR Carbon Dioxide Removal
CEC California Energy Commission
CEQA California Environmental Quality Act
CERCLA Comprehensive Environmental Response, Compensation, and Liability Act CESA California Endangered Species Act
CFC chlorofluorocarbon
CFL Compact Fluorescent Light
CFR Code of Federal Regulations
cfs cubic feet per second
CH4 methane
CHL California Historical Landmarks
City of Visalia—Shirk and Riggin Industrial Project
Draft EIR Acronyms and Abbreviations
xi
CHRIS California Historical Resources Information System CIP Capital Improvement Program
CMP Congestion Management Plan
CNDDB California Natural Diversity Database
CNEL Community Noise Equivalent Level
CNPS California Native Plant Society
CNRA California Natural Resources Agency
CO carbon monoxide
CO2e carbon dioxide equivalent
CPHI California Points of Historical Interest
CPUC California Public Utilities Commission
CRA Cultural Resources Assessment
CRHR California Register of Historical Resources
CUPA Certified Unified Program Agency
CUWCC California Urban Water Conservation Council
CWA Clean Water Act
dB decibel
dBA A-weighted decibel
DBH diameter at breast height
DPM diesel particulate matter
DTSC California Department of Toxic Substances Control
du dwelling unit
du/acre dwelling unit per acre
DWR California Department of Water Resources
EDR Environmental Data Resources, Inc.
EIR Environmental Impact Report
EISA Energy Independence and Security Act of 2007
EOP Emergency Operations Plan
EPA United States Environmental Protection Agency
EV electric vehicle
EVA Emergency Vehicle Access
FAA Federal Aviation Administration
FAR floor area ratio
FCS FirstCarbon Solutions
FEMA Federal Emergency Management Agency
FHSZ Fire Hazard Severity Zone
FHWA Federal Highway Administration
FIRM Flood Insurance Rate Map
City of Visalia—Shirk and Riggin Industrial Project
Acronyms and Abbreviations Draft EIR
xii
FMMP Farmland Mapping and Monitoring Program
FRA Federal Responsibility Area
FRAP Fire and Resource Assessment Program
ETo evapotranspiration
GAMAQI Guide for Assessing and Mitigating Air Quality Impacts GHG greenhouse gas
GMP Groundwater Management Plan
GPD gallons per day
gpm gallons per minute
GPS Global Positioning System
GSP Groundwater Sustainability Plan
GWh gigawatt-hours
GWh/y gigawatt-hours per year
GWP global warming potential
HAP Hazardous Air Pollutants
HCM Highway Capacity Manual
HCP Habitat Conservation Plan
HFC hydrofluorocarbon
HHRA Human Health Risk Assessment
HOV/HOT High Occupancy Vehicle/High Occupancy Toll
HRA Health Risk Assessment
HRI California Historic Resources Inventory
HVAC heating, ventilation, and air conditioning
IBC International Building Code
ICC International Code Council
IPCC United Nations Intergovernmental Panel on Climate Change IRWM Integrated Regional Water Management
ISTEA Intermodal Surface Transportation Efficiency Act
KDWCD Kaweah Delta Water Conservation District
kW kilowatts
kWh kilowatt-hour
LAFCo Local Agency Formation Commission
LCFS Low Carbon Fuel Standard
Ldn day/night average sound level
LED light-emitting diode
Leq equivalent sound level
LEV low-emission vehicle
LOS Level of Service
City of Visalia—Shirk and Riggin Industrial Project
Draft EIR Acronyms and Abbreviations
xiii
LRA Local Responsibility Area
LSE load-serving entities
M&I Municipal and Industrial
MBTA Migratory Bird Treaty Act
mgd million gallons per day
MJLHMP Multi-Jurisdictional Local Hazard Mitigation Plan MKGSS Mid-Kaweah Groundwater Sustainability Agency
MLD Most Likely Descendant
MM Mitigation Measure
MMRP Mitigation Monitoring and Reporting Program
MOU Memorandum of Understanding
mph miles per hour
MPO Metropolitan Planning Organization
MS4 Municipal Separate Storm Sewer System
MSR Municipal Services Review
MTS Metropolitan Transportation System
MW megawatt
MWD Metropolitan Water District of Southern California
MWELO Model Water Efficient Landscape Ordinance
MXD mixed-use development
N2O nitrous oxide
NAAQS National Ambient Air Quality Standards
NAHC Native American Heritage Commission
NEHRP National Earthquake Hazards Reduction Program
NEPA National Environmental Policy Act
NESHAP National Emissions Standards for Hazardous Air Pollutants NFIP National Flood Insurance Program
NFPA National Fire Protection Association
NHM Natural History Museum of Los Angeles County
NHPA National Historic Preservation Act
NHTSA National Highway Traffic Safety Administration
NO2 nitrogen dioxide
NOAA Fisheries National Marine Fisheries Service
NOC Notice of Completion
NOP Notice of Preparation
NOx nitrogen oxides
NPDES National Pollutant Discharge Elimination System
NRCS Natural Resources Conservation Service
City of Visalia—Shirk and Riggin Industrial Project
Acronyms and Abbreviations Draft EIR
xiv
NRHP National Register of Historic Places
NWIC Northwest Information Center
O3 ozone
OAL Office of Administrative Law
OEHHA California Office of Environmental Health Hazard Assessment OHWM ordinary high water mark
ONAC Federal Office of Noise Abatement and Control
OPR Governor’s Office of Planning and Research
OSHA Occupational Safety and Health Administration
PACE Property Assessed Clean Energy
PCB polychlorinated biphenyl
pCi/L picocuries per liter
PEV plug-in electric vehicle
PFC perfluorocarbon
PG&E Pacific Gas and Electric Company
Phase I ESA Phase I Environmental Site Assessment
PM10 particulate matter 10 micrometers or less in diameter PM2.5 particulate matter 2.5 micrometers or less in diameter PMx particulate matter
ppb parts per billion
ppm parts per million
PPV peak particle velocity
PRC Public Resources Code
psi pounds per square inch
PVC polyvinyl chloride
RCRA Resource Conservation and Recovery Act
Recology Integrated Resource Recovery Company
RecycleSmart Central Contra Costa County Solid Waste Authority REL Reference Exposure Level
RHNA Regional Housing Needs Assessment
RMP Risk Management Plan
rms root mean square
RNG renewable natural gas
ROG reactive organic gases
RPS Renewables Portfolio Standard
RTP Regional Transportation Plan
RWQCB Regional Water Quality Control Board
Sacramento Metro AQMD Sacramento Metropolitan Air Quality Management District City of Visalia—Shirk and Riggin Industrial Project
Draft EIR Acronyms and Abbreviations
xv
SB Senate Bill
SCE Southern California Edison
SCS Sustainable Communities Strategy
SEI Strategic Energy Innovation
SF6 sulfur hexafluoride
SFPUC San Francisco Public Utilities Commission
SGMA Sustainable Groundwater Management Act
SLCP Short-Lived Climate Pollutant
SNAP California Significant New Alternatives Policy
SO2 sulfur dioxide
SoCalGas Southern California Gas Company
SOI Sphere of Influence
South Coast AQMD South Coast Air Quality Management District SR State Route
SRA State Responsibility Area
SSJVIC Southern San Joaquin Valley Information Center
State Water Board California State Water Resources Control Board SVP Society of Vertebrate Paleontology
SWIS Solid Waste Information System
SWMP Storm Water Management Plan
SWPPP Storm Water Pollution Prevention Plan
TAC toxic air contaminants
TAZ Traffic Analysis Zone
TCAG Tulare County Association of Governments
TCM transportation control measures
TCR Tribal Cultural Resource
TDM Transportation Demand Management
TDS total dissolved solids
TDV Time Dependent Valuation
TEA-21 Transportation Equity Act for the 21st Century
Tg teragram
therms/y therms per year
TIA Traffic Impact Analysis
TID Tulare Irrigation District
TIS Traffic Impact Study
TMA Transportation Management Association
TMDL Total Maximum Daily Load
TOD Transit Oriented Development
City of Visalia—Shirk and Riggin Industrial Project
Acronyms and Abbreviations Draft EIR
xvi
TRU Transport Refrigeration Unit
UAB Urban Area Boundary
UBC Uniform Building Code
UDB Urban Development Boundary
UGB Urban Growth Boundary
UPS United Parcel Service
USACE United States Army Corps of Engineers
USC United States Code
USDA United States Department of Agriculture
USDOT United States Department of Transportation
USFWS United States Fish and Wildlife Service
USGS United States Geological Survey
UST underground storage tank
UV ultraviolet
UWMP Urban Water Management Plan
V/C volume to capacity ratio
Valley Air District San Joaquin Valley Air Pollution Control District VDECS Verified Diesel Emission Control Strategies
VECC Visalia Emergency Communication Center
VERA Voluntary Emissions Reduction Agreements
VFD Visalia Fire Department
VHFHSZ Very High Fire Hazard Severity Zone
VMT Vehicle Miles Traveled
VOC volatile organic compound
VPD Visalia Police Department
VUSD Visalia Unified School District
WCP Water Conservation Plant
WDR Waste Discharge Requirements
WEAP Worker Environmental Awareness Program
WQMP Water Quality Management Plan
WSA Water Supply Assessment
WUI wildland urban interface
WWTP Wastewater Treatment Plant
ZEV Zero-Emission Vehicle
City of Visalia—Shirk and Riggin Industrial Project
Draft EIR Executive Summary
ES-1
EXECUTIVE SUMMARY
Purpose
This Draft Environmental Impact Report (Draft EIR) is prepared in accordance with the California Environmental Quality Act (CEQA) to evaluate the potential environmental impacts associated with the implementation of the Shirk and Riggin Industrial Project (State Clearinghouse No. 2022080658).
This document is prepared in conformance with CEQA (Public Resources Code [PRC] § 21000, et seq.) and the CEQA Guidelines (California Code of Regulations [CCR], Title 14, § 15000, et seq.).
The purpose of this Draft EIR is to inform decision-makers, representatives of affected and responsible agencies, the public, and other interested parties of the potential environmental effects that may result from implementation of the proposed project. This Draft EIR describes potential impacts relating to a wide variety of environmental issues and methods by which these impacts can be mitigated or avoided.
Project Summary
Project Location
The project site is generally bound by Riggin Avenue to the south, Shirk Street to the east, Kelsey Street to the west, and Modoc Ditch to the north. A private road intersects the project site from south to north. The project site consists of three existing parcels: Assessor’s Parcel Numbers [APNs] 077-840- 004, 077-840-005, and 077-840-006 (formerly APNs 077-840-001, 077-840-002, and 077-840-003).
The project site is within the City’s Planning Area,
1 Urban Development Boundary (UDB) Tier 1 of the
City, and the City’s Sphere of Influence (SOI).
Project Description
The project applicant proposes to convert existing agricultural lands and develop the approximately 284-acre project site into an industrial park, consisting of eight industrial buildings used for warehouse, distribution, and light manufacturing; six flex industrial buildings; two drive-through restaurants; a convenience store; a recreational vehicle (RV) and self storage facility; gas station; and a car wash. The total building footprint is approximately 3,720,149 square feet. The project site would include sufficient amounts of trailer stalls and car parking stalls to serve the proposed uses in accordance with applicable City requirements. The proposed project would also involve necessary infrastructure and improvements sufficient to serve the proposed uses. These would include detention basins on the east, west, and central portions of the project site and other necessary stormwater facilities to be sized and installed in accordance with all applicable requirements and standards. Access would be provided via three access points along Shirk Street, three access points along Riggin Avenue, and five access points along Kelsey Street. Clancy Street south of the project site would be extended to replace the existing private road and would traverse south to north of the
1 Planning area refers to the land area addressed by a General Plan, including land within the city limits and land outside the city limits that bears a relation to the City’s planning. This area is not all intended for development; the Urban Growth Boundary shows the future development area.
City of Visalia—Shirk and Riggin Industrial Project
Executive Summary Draft EIR
ES-2
site. On-site orchards would need to be removed, and that appropriate landscaping and lighting would be incorporated into the overall site design consistent with applicable City requirements and guidelines.
The proposed project would need to be annexed into the city limits, and upon annexation, would be served by the City of Visalia for purposes of water and wastewater. In addition, the other entitlements associated with this project include a Tentative Parcel Map and a Conditional Use Permit for some of the uses proposed (convenience store, drive-through lanes), some of the proposed lot sizes in the light industrial zoning, and lots without public street frontage.
Chapter 2, Project Description, provides a complete description of the proposed project.
Project Objectives
The fundamental purpose and goal of the proposed project is to accomplish the orderly development of the project site as proposed, consistent with the General Plan’s industrial land use designation, which would provide economic benefits to the City, among others. As stated in Chapter 2, Project Description, the objectives of the proposed project are to:
• Ensure that development of the project site is accomplished in an economically viable manner consistent with applicable goals and policies as set forth in the City’s General Plan, including the land use vision set forth therein that contemplates light industrial and industrial uses, taking into account necessary site plan considerations including efficient access and loading. • Maximize development of the existing underutilized project site and generate increased revenue and economic development for the City in order to support the City’s ongoing City operations.
• Develop a mixed-use industrial park, with light manufacturing, warehouse, distribution, and/or flex industrial uses, in the City that is designed to meet market demand and contemporary industry standards, including building size and clear height requirements, modern façades, articulated concrete panels, a natural color palette, and expansive glass entry features.
• Create employment-generating businesses in the City to reduce the need for members of the local workforce to commute outside the area for employment and to improve the jobs-to- housing balance.
• Maximize placement of industrial uses in close proximity to the State Highway system (SR-99) and other major transportation corridors to avoid or shorten truck-trip lengths, as feasible, on other roadways and to avoid locating industrial buildings in close proximity to residential uses or other sensitive receptors.
• Develop innovative industrial uses providing a range of building sizes with cross dock and rear load capability that have ready access to available infrastructure, including major transportation corridors and utilities to be used as part of the Central Valley supply chain and goods movement network.
City of Visalia—Shirk and Riggin Industrial Project
Draft EIR Executive Summary
ES-3
Significant Unavoidable Adverse Impacts
As required under CEQA, the proposed project was analyzed for potentially significant impacts related to each of the environmental topic areas discussed in Sections 3.1 through 3.16. The results of the analysis indicate that the proposed project would result in the following significant and unavoidable impacts:
• Project-level conversion of prime farmland: Although the proposed project is consistent with the project site’s General Plan designation and conversion of the project site to industrial use has long been envisioned as part of buildout under the General Plan, the proposed project would result in the loss of agricultural land and conversion of Prime Farmland to urban uses.
There are no feasible mitigation measures available to reduce this impact. Accordingly, despite the fact that this conversion was previously evaluated and disclosed as part of the General Plan EIR, this Draft EIR has evaluated and hereby discloses that the proposed project would result in significant and unavoidable impacts related to the conversion of Important Farmland identified by Farmland Mapping and Monitoring Program (FMMP) mapping to nonagricultural use.
• Cumulative conversion of prime farmland: Much of the City’s UDB consists of Important Farmland that would be converted to nonagricultural uses with implementation of future development already envisioned by the General Plan Land Use Element. Development within Tier II and III of the UDB that would convert Prime Farmland is subject to the 1:1 ratio of agricultural land preservation elsewhere outside of the City’s UDB. Although cumulative projects occurring in Tier II and III of the UDB would be required to preserve agricultural land elsewhere, loss of Prime Farmland would still occur and the cumulative impact remains significant. The development of the proposed project would further contribute to this already significant cumulative impact, due to the loss of approximately 284 acres of Prime Farmland, which has been identified as an individual significant and unavoidable impact due to lack of feasible mitigation. Moreover, the proposed project’s contribution to this significant cumulative effect to agricultural resources would be considered cumulatively considerable. • Project-level impact related to implementation of the applicable Air Quality Plan: The proposed project is consistent with the project site’s General Plan designation which means the proposed industrial use was accounted for in the Air Quality Plan (AQP) land use projections. However, the proposed project could create a localized violation of State or federal air quality standards, significantly contribute to cumulative nonattainment pollutant violations, and could expose sensitive receptors to substantial pollutant concentrations. The proposed project would be required to implement MM AIR-2a through MM AIR-2g. However, because MM AIR-2a through MM AIR-2f would not reduce construction or operational impacts below the applicable thresholds and full implementation of MM AIR-2g cannot be guaranteed due to potential technical and/or financial feasibility, the proposed project’s potentially significant impact is conservatively identified as significant and unavoidable.
Therefore, the proposed project is inconsistent with Criterion 1 of the AQP even after the incorporation of feasible mitigation. The impact would be significant and unavoidable.
City of Visalia—Shirk and Riggin Industrial Project
Executive Summary Draft EIR
ES-4
• Project-level impact related to cumulatively considerable net increase of nitrogen oxide (NOX) during construction, and reactive organic gas (ROG), NOX, and particulate matter 10 micrometers or less in diameter (PM10) during operation: For purposes of a conservative analysis, this Draft EIR evaluated the potential impacts assuming that none of the three anticipated project phases overlapped (sequential), and also considered the potential impacts if the project phases did, in fact, overlap (concurrent). In the sequential phasing scenario, after the incorporation of MM AIR-2a and MM AIR-2b, construction of the proposed project would not exceed the applicable San Joaquin Valley Air Pollution Control District (Valley Air District) daily emission screening levels for an Ambient Air Quality Analysis (AAQA), pursuant to District Rule 2201. However, if the three phases of construction occur concurrently, emissions of carbon monoxide (CO) and NOX would exceed the applicable Valley Air District’s significance thresholds even after implementation of feasible mitigation. As such, this impact would remain significant and unavoidable after implementation of identified mitigation.
During operation, unmitigated emissions would exceed applicable Valley Air District thresholds of significance for CO, ROG, and NOX. Therefore, MM AIR-2c through MM AIR-2g would be required to mitigate operational emissions to below Valley Air District thresholds.
However, the full implementation of MM AIR-2c through MM AIR-2f would not reduce emissions below the applicable thresholds and MM AIR-2g cannot be guaranteed during project operation; therefore, the reasonable worst-case operational emissions would exceed the applicable Valley Air District’s significance thresholds for CO, ROG, NO X, and PM10 and this
impact would remain significant and unavoidable.
• Cumulative significant air quality impact: Because the proposed project would exceed certain identified construction and operational significance thresholds, its emissions would also be cumulatively considerable.
• Project-level impact related to mobile source operational noise: Without development of the proposed project, nearly every roadway segment is estimated to experience noise increases from a minimum 0.9 A-weighted decibel (dBA) equivalent sound level (L eq) maximum 8.6 dBA
Leq by 2028, compared to existing traffic noise levels. The addition of the proposed project’s traffic would increase noise levels up to an additional 3.7 dBA Leq upon full buildout. The proposed project would contribute to increasing traffic volumes—and therefore traffic-related noise levels—in its primary trip distribution area, which is generally bounded by the project site/Riggin Avenue to the north, State Route (SR) 99 to the west, Akers Street to the east, and SR-198 to the south. There are no feasible mitigation measures available to reduce this impact to less than significant. The proposed project’s off-site mobile source operational noise impact from traffic generation would be considered significant and unavoidable. • Cumulative noise impact: The proposed project would exceed the identified operational significance threshold, its impact would also be cumulatively considerable.
Summary of Project Alternatives
Below is a summary of the alternatives to the proposed project considered in Chapter 5, Alternatives to the Proposed Project.
City of Visalia—Shirk and Riggin Industrial Project
Draft EIR Executive Summary
ES-5
No Project Alternative
Under this alternative, development of the project site would not occur, and the project site would remain in its current existing condition.
Reduced Footprint Alternative
Under this alternative, the proposed project would be developed in such a way as to reduce some construction and operational air quality impacts, operational noise impacts, and protect some of the on-site Prime Farmland by reducing the overall footprint of the developed areas. The eastern half of the project site, approximately 142 acres, would be preserved and would remain in agricultural production, and half of the total warehouse and industrial park land uses would be developed. The proposed associated commercial uses would be relocated to the western half of the site. The stormwater basins would be sized accordingly. It is assumed that culvert crossings over Modoc Ditch would be required, similar to the proposed project.
Alternative Location
Under this alternative, the proposed project would be constructed in the approximately 290-acre parcel west of Plaza Drive and Riggin Avenue. This parcel is selected as it is one of the remaining parcels within Tier I of the UDB that is designated as Industrial and therefore generally suitable for the proposed development. The proposed project would require a General Plan Amendment to re- designate a portion of the site as Light Industrial for the proposed associated flex industrial/commercial uses conditionally allowed under Light Industrial. This site would be approximately 650 feet from the nearest sensitive receptors located to the southwest.
Areas of Controversy
Pursuant to CEQA Guidelines Section 15123(b), a summary section must address areas of controversy known to the lead agency, including issues raised by agencies and the public, and it must also address issues to be resolved, including the choice among alternatives and whether or how to mitigate the significant effects.
A Notice of Preparation (NOP) for the proposed project was issued on August 30, 2022. The NOP describing the original concept for the project and issues to be addressed in the EIR was distributed to the State Clearinghouse, responsible agencies, and other interested parties for a 30-day public review period extending from August 30, 2022, through September 28, 2022. The NOP identified the potential for significant impacts on the environment related to the following topical areas:
• Aesthetics
• Agricultural Resources and Forestry Resources
• Air Quality
• Biological Resources
• Cultural Resources and Tribal Cultural Resources
• Energy
• Geology and Soils
• Greenhouse Gas Emissions
• Hazards and Hazardous Materials
• Hydrology and Water Quality
• Land Use and Planning
• Noise
• Public Services
• Transportation
• Utilities and Service Systems
• Wildfire
City of Visalia—Shirk and Riggin Industrial Project
Executive Summary Draft EIR
ES-6
Disagreement Among Experts
This Draft EIR contains substantial evidence to support all the conclusions presented herein. It is possible that there will be disagreement among various parties regarding these conclusions, although the City of Visalia is not aware of any disputed conclusions at the time of this writing. Both the CEQA Guidelines and case law clearly provide the standards for treating disagreement among experts. Where evidence and opinions conflict on an issue concerning the environment, and the lead agency knows of these controversies in advance, the EIR must acknowledge the controversies, summarize the conflicting opinions of the experts, and include sufficient information to allow the public and decision-makers to make an informed judgment about the environmental consequences of the proposed project.
Potentially Controversial Issues
Below is a list of potentially controversial issues that may be raised during the public review and hearing process of this Draft EIR:
• Construction and operational emissions and Health Risk Assessment. • Potential impacts to the Swainson’s hawk, Crotch’s bumblebee, and the northern legless lizard.
• Tribal consultation requirements and cultural resource assessment.
It is also possible that evidence will be presented during the 45-day, statutory Draft EIR public review period that may create disagreement. Decision-makers would consider this evidence during the public hearing process.
In rendering a decision on a project where there is disagreement among experts, the decision- makers are not obligated to select the most environmentally preferable viewpoint. Decision-makers are vested with the ability to choose whatever viewpoint is preferable and need not resolve a dispute among experts. In their proceedings, decision-makers must consider comments received concerning the adequacy of the Draft EIR and address any objections raised in these comments.
However, decision-makers are not obligated to follow any directives, recommendations, or suggestions presented in comments on the Draft EIR, and can certify the Final EIR without needing to resolve disagreements among experts.
Public Review of the Draft EIR
Upon completion of the Draft EIR, the City of Visalia filed a Notice of Completion (NOC) with the State Office of Planning and Research to begin the public review period (PRC § 21161). Concurrent with the NOC, this Draft EIR has been distributed to responsible and trustee agencies, other affected agencies, surrounding cities, and interested parties, as well as all parties requesting a copy of the Draft EIR in accordance with Public Resources Code 21092(b)(3). During the public review period, the Draft EIR, including the technical appendices, is available for review at the City’s Planning Department. The address is provided below:
City of Visalia—Shirk and Riggin Industrial Project
Draft EIR Executive Summary
ES-7
Visalia City Hall
315 East Acequia Avenue
Visalia, CA 93291
The Draft EIR is also available for review at the following website:
https://www.visalia.city/depts/community_development/planning/ceqa_environmental_review.asp Agencies, organizations, and interested parties have the opportunity to comment on the Draft EIR during the 45-day public review period. Written comments on this Draft EIR should be addressed to:
Brandon Smith, Principal Planner
City of Visalia
315 East Acequia Avenue
Visalia, CA 93291
559.713.4636
[email protected]
Submittal of electronic comments in Microsoft Word or Adobe PDF format is encouraged. Upon completion of the public review period, written responses to all significant environmental issues raised will be prepared and made available for review by the commenting agencies at least 10 days prior to the public hearing before the City of Visalia on the project, at which the certification of the Final EIR will be considered. Comments received and the responses to comments will be included as part of the record for consideration by decision-makers for the project.
Executive Summary Matrix
Table ES-1 below summarizes the impacts, mitigation measures, and resulting level of significance after mitigation for the relevant environmental issue areas evaluated for the proposed project. The table is intended to provide an overview; narrative discussions for the issue areas are included in the corresponding section of this EIR. Table ES-1 is included in the EIR as required by CEQA Guidelines Section 15123(b)(1).
City of Visalia—Shirk and Riggin Industrial Project
Draft EIR Executive Summary
ES-8
Table ES-1: Executive Summary Matrix
Impacts Mitigation Measures Level of Significance After Mitigation Section 3.1—Aesthetics, Light, and Glare
Impact AES-1: The proposed project would not have a
substantial adverse effect on a scenic vista.
No mitigation measures are required. Less than significant impact.
Impact AES-2: The proposed project would not
substantially damage scenic resources, including, but not limited to, trees, rock outcroppings, and historic
buildings within a State Scenic Highway.
No mitigation measures are required. No impact.
Impact AES-3: The proposed project would not
substantially degrade the existing visual character or
quality of public views of the site and its surroundings (public views are those that are experienced from
publicly accessible vantage point).
No mitigation measures are required. Less than significant impact.
Impact AES-4: The proposed project would not create a
new source of substantial light or glare which would
adversely affect day or nighttime views in the area.
No mitigation measures are required. Less than significant impact.
Cumulative Impact: The proposed project would not
have a cumulative impact related to aesthetics, light,
and glare.
No mitigation measures are required. Less than significant impact.
Section 3.2—Agriculture and Forest Resources
Impact AG-1: The proposed project would convert Prime
Farmland, Unique Farmland, or Farmland of Statewide
Importance (Farmland) as shown on the maps prepared
pursuant to the Farmland Mapping and Monitoring
Program of the California Resources Agency, to
nonagricultural use.
No feasible mitigation measures available. Significant and unavoidable impact.
Impact AG-2: The proposed project would not conflict
with existing zoning for agricultural use, or a Williamson Act Contract.
No mitigation measures are required. Less than significant impact.
Impact AG-3: The proposed project would not conflict
with existing zoning for, or cause rezoning of, forest land No mitigation measures are required. No impact.
City of Visalia—Shirk and Riggin Industrial Project
Draft EIR Executive Summary
ES-9
Impacts Mitigation Measures Level of Significance After Mitigation (as defined in Public Resources Code Section 12220(g)), timberland (as defined by Public Resources Code Section 4526), or timberland zoned Timberland Production (as
defined by Government Code Section 51104(g)).
Impact AG-4: The proposed project would not result in
the loss of forest land or conversion of forest land to non-forest use.
No mitigation measures are required. No impact.
Impact AG-5: The proposed project would not involve
other changes in the existing environment which, due to their location or nature, could result in conversion of Farmland, to nonagricultural use or conversion of forest land to non-forest use.
No mitigation measures are required. Less than significant impact.
Cumulative Impact: The proposed project would have
significant and unavoidable impacts related to
agricultural resources.
No feasible mitigation measures are available. Significant and unavoidable with respect to the loss of Prime
Farmland, Unique Farmland, or
Farmland of Statewide Importance.
Section 3.3—Air Quality
Impact AIR-1: The proposed project would conflict with
or obstruct implementation of the applicable air quality plan.
Implement MM AIR-2a through MM AIR-2g (see Impact AIR-2). Significant and unavoidable impact.
Impact AIR-2: The proposed project would result in a
cumulatively considerable net increase of any criteria
pollutant for which the project region is nonattainment under an applicable federal or State ambient air quality standard.
MM AIR-2a: Use of Tier IV or Tier IV Equivalent Construction Off-Road Equipment
Before a construction permit is issued for the proposed project, the project sponsors shall submit construction emissions minimization plans to the City of Visalia for review and approval. The construction emissions minimization plans shall detail compliance with the following requirements:
(1) Subject to same being commercially available, all off-road equipment utilized in connection with the subject individual development proposal shall have engines that meet either EPA or ARB Tier IV Final off-road emission standards. Provided, however, if engines that comply with Tier IV Final off-road emission standards are not commercially available, then the construction contractor shall use the next cleanest piece of off-road equipment (e.g., Tier IV Interim) Significant and unavoidable impact.
City of Visalia—Shirk and Riggin Industrial Project
Draft EIR Executive Summary
ES-10
Impacts Mitigation Measures Level of Significance After Mitigation available. For purposes of this mitigation measure, “commercially available” shall mean the availability of Tier IV Interim engines taking into consideration factors such as (i) critical-path timing of construction; (ii) costs of utilizing same are commercially practicable; and (iii) geographic proximity to the project site of equipment. The relevant contractor’s provision to the City letters from at least two rental companies for each piece of off-road equipment that reasonably documents the lack of commercially available off-road equipment shall be deemed sufficient for purposes of complying with this mitigation measure. The project applicant and contractor shall consider the use of near zero-emission or electric construction equipment if that type of equipment is commercially available at the time of grading permit submittal.
(2) Post signage on the project site stating that construction equipment idling times shall not exceed five minutes.
MM AIR-2b: Super Compliant Architectural Coating During Construction Prior to issuance of a grading permit in connection with an individual specific development proposal for the proposed project, the relevant project sponsor shall submit to the City of Visalia Planning Division construction contracts and/or subcontracts reasonably documenting that all architectural coating material utilized in connection with the subject individual specific development proposal would not exceed 10 grams of volatile organic compound (VOC) per liter of coating.
To satisfy the above, the relevant project sponsor shall include in any construction contracts and/or subcontracts for the subject individual specific development proposal a requirement that all interior and exterior architectural coatings used in project construction meet the “super- compliant” coating VOC content standard of 10 grams or less of VOC per liter of coating. The relevant project sponsor shall also specify in the subject construction contracts and/or subcontracts the requirement to use high-volume, low-pressure spray guns during coating applications to reduce coating waste.
City of Visalia—Shirk and Riggin Industrial Project
Draft EIR Executive Summary
ES-11
MM AIR-2c: Electric or Zero-Emission On-site Off-Road and On-Road Service Equipment
Prior to issuance of the construction grading permit in connection with an individual specific development proposal for the proposed project, the relevant project sponsor shall provide reasonable documentation to demonstrate to the City of Visalia Planning Division that all on-site off-road and on-road service equipment will utilize zero-emission technology, subject to the same being commercially practicable. Additionally, the relevant project sponsor shall provide reasonable documentation to the City of Visalia Planning Division that all proposed buildings in connection with the subject individual specific development proposal that would use on-site service equipment will be designed to include electric outlets to equipment support the use of all-electric or zero-emission on-site service equipment, subject to the same being commercially practicable.
MM AIR-2d: Electric Vehicle Charging Infrastructure
Prior to issuance of the grading or building permit in connection with an individual specific development proposal for the proposed project, whichever occurs first, the relevant project sponsor shall provide reasonable documentation to the City of Visalia Planning Division demonstrating that the subject individual specific development proposal shall incorporate infrastructure for electric vehicle (EV) charging stations into a minimum of 20 percent of all vehicle parking spaces (including parking for trucks), consistent with the applicable California Green Building Standards Code Tier 1 Nonresidential Mandatory Measure (Section A5.106.5.3). To satisfy the foregoing, EV charging spaces must provide electrical vehicle charging infrastructure to support future installation of EV supply equipment and shall meet the applicable design space requirements of California Green Building Standards Code Section
5.106.5.3.
In addition, the buildings’ electrical room shall be sufficiently sized to hold additional panels that may be needed to supply power for the future installation of EV truck charging stations on the site. Conduit should be installed from the electrical room to tractor trailer parking spaces in a logical location(s) on the site determined by the project applicant during construction document plan check, for the purpose of accommodating the future installation of EV truck charging stations at such time this City of Visalia—Shirk and Riggin Industrial Project
Draft EIR Executive Summary
ES-12
Impacts Mitigation Measures Level of Significance After Mitigation technology becomes commercially available and the buildings are being served by trucks with electric-powered engines.
MM AIR-2e: On-Site Signage and Pavement Markings
In connection with an individual specific development proposal for the proposed project, whichever occurs first, the relevant project sponsor shall provide reasonable documentation to the City of Visalia Planning Division demonstrating signage and pavement marking that show on-site circulation routes have been or will be included along the relevant portions of the project site driveways and internal roadways.
MM AIR-2f: Vegetative Barrier
Prior to issuance of the grading or building permit in connection with an individual specific development proposal for the proposed project, whichever occurs first, the relevant project sponsor shall provide reasonable documentation to the City of Visalia Planning Division demonstrating the inclusion of a vegetative barrier along the south and east property boundaries of the project site. Prior to issuance of first occupancy permit, the project applicant shall demonstrate to the Visalia Planning Division the installation of the vegetative barrier at the described locations.
MM AIR-2g: Voluntary Emission Reduction Agreement
Prior to issuance of the grading or building permit in connection with an individual specific development proposal for the proposed project, whichever occurs first, the relevant project sponsor shall consult with the City of Visalia Planning Division about the feasibility of entering into a Voluntary Emissions Reduction Agreement (VERA) with the Valley Air District.
Impact AIR-3: The proposed project would not expose
sensitive receptors to substantial pollutant
concentrations.
No mitigation measures are required. Less than significant impact.
Impact AIR-4: The proposed project would not result in
other emissions (such as those leading to odors)
adversely affecting a substantial number of people.
No mitigation measures are required. Less than significant impact.
City of Visalia—Shirk and Riggin Industrial Project
Draft EIR Executive Summary
ES-13
Impacts Mitigation Measures Level of Significance After Mitigation Cumulative Impact: The proposed project would have a
significant and unavoidable cumulative impact related to air quality.
Implement MM AIR-2a through MM AIR-2g. Significant and unavoidable impact.
Section 3.4—Biological Resources
Impact BIO-1: The proposed project could have a
substantial adverse effect, either directly or through
habitat modifications, on species identified as a
candidate, sensitive, or special-status species in local or regional plans, policies, or regulations, or by the
California Department of Fish and Wildlife or United
States Fish and Wildlife Service.
MM BIO-1a: Pre-construction Surveys for Swainson’s Hawk Prior to initial ground disturbance or building permits of any project area, if during the nesting season for Swainson’s hawk (March 20 to July 20), a qualified Biologist shall conduct Swainson’s hawk nesting surveys on-site and within a 0.5-mile radius of the project site to determine whether nests are present and if so, occupied. Occupancy shall be determined through observation of all accessible areas, including from public roads or other publicly accessible observation areas of Swainson’s hawk activity (e.g., foraging) on and near the project site. If ground disturbance occurs outside the nesting season, no further action is required.
A qualified Biologist shall follow the survey protocol outlined in the California Department of Fish and Wildlife (CDFW) Recommended Timing and Methodology for Swainson’s Hawk Nesting Surveys in California’s Central Valley, which recommends surveys according to the following survey periods:
1. January–March 20: Conduct one survey total.
2. March 20–April 5: Conduct three surveys total. Surveys shall be conducted between sunrise to 10:00 a.m. and/or 4:00 p.m. to sunset.
3. April 5–April 20: Conduct three surveys total. Surveys shall be conducted between sunrise to 12:00 p.m. and/or 4:30 p.m. to sunset.
4. April 21–June 10: Initiating surveys are not recommended. Monitoring of known nest sites only.
5. June 10–July 30: (post-fledging) Conduct three surveys total. Surveys shall be conducted between sunrise to 12:00 p.m. and/or 4:00 p.m. to sunset.
Pre-construction surveys shall be completed for at least the two survey periods immediately prior to the subject ground-disturbing activities being initiated, with the latest survey no more than 10 days prior to the start of the subject ground-disturbing A copy of the survey results shall be submitted to the lead agency as evidence of compliance.
Less than significant impact with
mitigation incorporated.
City of Visalia—Shirk and Riggin Industrial Project
Draft EIR Executive Summary
ES-14
Impacts Mitigation Measures Level of Significance After Mitigation MM BIO-1b: Swainson’s Hawk Avoidance and Minimization and Construction Monitoring
If nests are located and determined to be occupied, minimization measures must be implemented by the relevant applicant in connection with a specific individual development application, and construction monitoring conducted as follows:
1. Construction activities shall be prohibited within 600 feet of an active and occupied Swainson’s hawk nest or within 600 feet of nests under construction to prevent nest abandonment unless a smaller buffer is approved pursuant to subsection (2) below. This incorporates the maximum avoidance buffer size stated in the California Department of Fish and Wildlife (CDFW) Recommended Timing and Methodology for Swainson’s Hawk Nesting Surveys in California’s Central Valley.
2. If site-specific conditions or the nature of the construction activity (e.g., other nearby development, limited activities) indicate that a smaller buffer, or no buffer at all, could be used, the project developer may seek approval from the qualified Biologist who, in coordination with the CDFW, shall determine the appropriate buffer size, which, once approved, shall govern.
3. No tree containing an active Swainson’s hawk nest shall be removed.
If (i) no nests are located or (ii) if nests are located and determined not to be occupied, then no minimization measures shall need to be implemented and no further mitigation under this MM BIO-1b shall be required.
MM BIO-1c: Pre-Construction Surveys for Burrowing Owl (includes avoidance and passive relocation if found)
To determine whether burrowing owl have occupied the project site prior to its development, a qualified Biologist shall perform a pre-construction burrowing owl survey to determine burrow locations within 30 days prior to construction activities using California Department of Fish and Wildlife (CDFW) Guidelines. If construction is delayed or suspended for more than 30 days after the survey, the area shall be resurveyed. Surveys for occupied burrows shall be completed within all construction areas and within 300 feet of the proposed project impact area (where possible and appropriate based on locations of barren or ruderal habitats). At least 15 City of Visalia—Shirk and Riggin Industrial Project
Draft EIR Executive Summary
ES-15
Impacts Mitigation Measures Level of Significance After Mitigation days prior to the expected start, or restart, of any project-related ground disturbance activities, the project applicant shall provide a burrowing owl survey report with mapping exhibits to the CDFW. If no burrowing owl are detected during the pre-construction survey, no further action is necessary.
If burrowing owl are detected during the pre-construction survey, the following actions shall be taken to offset impacts during construction (as outlined in the CDFW 2012 Guidelines):
• During the nonbreeding season (September 1 through January 31), no disturbance shall occur within an approximately 160-foot radius of an occupied burrow. During the nesting season (February 1 through August 31), occupied burrows shall not be disturbed within a 300-foot radius unless a qualified Biologist approved by the CDFW verifies through non- invasive methods that either (1) the birds have not begun egg-laying and incubation or (2) that juveniles from the occupied burrows are foraging independently and are capable of independent survival.
• If owls must be moved away from the disturbance area, passive relocation techniques (as outlined by the CDFW [i.e., use of one-way doors]) should be used rather than trapping. At least one or more weeks will be necessary to accomplish this and to allow the owls to acclimate to alternate burrows.
• If unpaired owls or paired owls are present in or within 300 feet of areas scheduled for disturbance or degradation (e.g., grading) and nesting is not occurring, owls are to be removed per CDFW-approved passive relocation protocols. Passive relocation requires the use of one-way exclusion doors, which must remain in place at least 48 hours prior to site disturbance to ensure owls have left the burrow prior to construction. A CDFW-approved exclusion plan would be required to implement this measure.
• If paired owls are nesting in areas scheduled for disturbance or degradation, nest(s) shall be avoided from February 1 through August 31 by a minimum 300-foot buffer or until fledging has occurred. Following fledging, owls may be passively relocated.
City of Visalia—Shirk and Riggin Industrial Project
Draft EIR Executive Summary
ES-16
Impacts Mitigation Measures Level of Significance After Mitigation MM BIO-1d: Pre-construction Special-status Species Wildlife Surveys and Protective Measures if Found, Including Standard Avoidance Measures for San Joaquin Kit Fox.
Not more than 14 days before start of ground disturbance, a qualified Biologist shall conduct surveys to determine the presence/absence of the following special-status wildlife species: Crotch’s bumblebee, San Joaquin kit fox, western burrowing owl, and American badger. Should any of the foregoing special-status wildlife species be detected, the qualified Biologist shall coordinate with the California Department of Fish and Wildlife (CDFW) and/or the United States Fish and Wildlife Service (USFWS) (as appropriate) to determine adequate protection measures as may be required under applicable laws and regulations, and the relevant project developer shall implement all such measures in connection with the development proposal at issue. Copies of all reports and communication with the appropriate wildlife agencies shall be submitted to the lead agency as evidence of compliance.
The following standardized recommendations as outlined by the USFWS for the protection of San Joaquin Kit Fox shall be implemented during project construction:
1. Project-related vehicles should observe a daytime speed limit of 20- mph throughout the site in all project areas, except on county roads and State and Federal highways; this is particularly important at night when kit foxes are most active. Nighttime construction should be minimized to the extent possible. However if it does occur, then the speed limit should be reduced to 10-mph. Off-road traffic outside of designated project areas should be prohibited.
2. To prevent inadvertent entrapment of kit foxes or other animals during the construction phase of a project, all excavated, steep-walled holes or trenches more than 2-feet deep should be covered at the close of each working day by plywood or similar materials. If the trenches cannot be closed, one or more escape ramps constructed of earthen-fill or wooden planks shall be installed. Before such holes or trenches are filled, they should be thoroughly inspected for trapped animals. If at any time a trapped or injured kit fox is discovered, the Service and the California Department of Fish and Game (CDFG) shall be contacted as noted under measure 13 referenced below.
City of Visalia—Shirk and Riggin Industrial Project
Draft EIR Executive Summary
ES-17
Impacts Mitigation Measures Level of Significance After Mitigation
3. Kit foxes are attracted to den-like structures such as pipes and may enter stored pipes and become trapped or injured. All construction pipes, culverts, or similar structures with a diameter of 4-inches or greater that are stored at a construction site for one or more overnight periods should be thoroughly inspected for kit foxes before the pipe is subsequently buried, capped, or otherwise used or moved in any way.
If a kit fox is discovered inside a pipe, that section of pipe should not be moved until the Service has been consulted. If necessary, and under the direct supervision of the Biologist, the pipe may be moved only once to remove it from the path of construction activity, until the fox has escaped.
4. All food-related trash items such as wrappers, cans, bottles, and food scraps should be disposed of in securely closed containers and removed at least once a week from a construction or project site.
5. No firearms shall be allowed on the project site.
6. No pets, such as dogs or cats, should be permitted on the project site to prevent harassment, mortality of kit foxes, or destruction of dens.
7. Use of rodenticides and herbicides in project areas should be restricted. This is necessary to prevent primary or secondary poisoning of kit foxes and the depletion of prey populations on which they depend. All uses of such compounds should observe label and other restrictions mandated by the U.S. Environmental Protection Agency, California Department of Food and Agriculture, and other State and Federal legislation, as well as additional project-related restrictions deemed necessary by the Service. If rodent control must be conducted, zinc phosphide should be used because of a proven lower risk to kit fox.
8. A representative shall be appointed by the project proponent who will be the contact source for any employee or contractor who might inadvertently kill or injure a kit fox or who finds a dead, injured or entrapped kit fox. The representative will be identified during the employee education program and their name and telephone number shall be provided to the Service.
9. An employee education program should be conducted for any project that has anticipated impacts to kit fox or other endangered species.
The program should consist of a brief presentation by persons knowledgeable in kit fox biology and legislative protection to explain City of Visalia—Shirk and Riggin Industrial Project
Draft EIR Executive Summary
ES-18
Impacts Mitigation Measures Level of Significance After Mitigation endangered species concerns to contractors, their employees, and military and/or agency personnel involved in the project. The program should include the following: A description of the San Joaquin kit fox and its habitat needs; a report of the occurrence of kit fox in the project area; an explanation of the status of the species and its protection under the Endangered Species Act; and a list of measures being taken to reduce impacts to the species during project construction and implementation. A fact sheet conveying this information should be prepared for distribution to the previously referenced people and anyone else who may enter the project site.
10. Upon completion of the project, all areas subject to temporary ground disturbances, including storage and staging areas, temporary roads, pipeline corridors, etc. should be re-contoured if necessary, and revegetated to promote restoration of the area to pre-project conditions.
11. In the case of trapped animals, escape ramps or structures should be installed immediately to allow the animal(s) to escape, or the Service should be contacted for guidance.
12. Any contractor, employee, or military or agency personnel who are responsible for inadvertently killing or injuring a San Joaquin kit fox shall immediately report the incident to their representative. This representative shall contact the CDFG immediately in the case of a dead, injured or entrapped kit fox.
13. The Sacramento Fish and Wildlife Office and CDFG shall be notified in writing within three working days of the accidental death or injury to a San Joaquin kit fox during project-related activities. Notification must include the date, time, and location of the incident or of the finding of a dead or injured animal and any other pertinent information.
14. New sightings of kit fox shall be reported to the California Natural Diversity Database (CNDDB). A copy of the reporting form and a topographic map clearly marked with the location of where the kit fox was observed should also be provided to the Service at the address below.
City of Visalia—Shirk and Riggin Industrial Project
Draft EIR Executive Summary
ES-19
MM BIO-1e: Protection of Active Bird Nests (includes pre-construction survey and implementation of avoidance buffer, if found).
1. Removal of trees shall occur in compliance with and as required by the City’s Tree Preservation Ordinance.
2. If project development requires trees to be removed during the nesting season, pre-construction nesting bird surveys shall be conducted 7 days prior to tree removal to determine whether active nests are present.
3. If an active nest is located during pre-construction surveys, a qualified Biologist shall determine an appropriately sized avoidance buffer based on species and anticipated disturbance level. The buffer shall be 250 feet for migratory bird species and 500 feet for raptors. That no- disturbance buffer can be reduced if it is determined whether a qualified on-site monitor determines through monitoring the effects of activities on the nest that the buffer can be reduced without nest abandonment or otherwise affecting nest success.
4. The relevant applicant of the proposed development at issue shall physically mark the nest protection zone with Environmentally Sensitive Area fencing, pin flags, and/or yellow caution tape. The nest protection zone shall be maintained around the active nest site(s) until the young have fledged and are foraging independently, as determined by a qualified Biologist. No construction activities or construction foot traffic is allowed to occur within the nest protection zones until the young have fledged and are foraging independently, as determined by a qualified Biologist.
5. The qualified Biologist shall monitor the active nest(s) periodically during construction activities to prevent any significant impacts that may result from the construction of the proposed project, until the young have fledged. Copies of the survey report shall be submitted to the lead agency as evidence of compliance.
If no active nests are located, then no minimization measures shall need to be implemented and no further mitigation under this MM BIO-1e shall be required.
MM BIO-1f: Protection of Roosting Bats (includes pre-construction survey and implementation of avoidance buffer, if found).
If tree removal or demolition of existing structures is proposed in connection with project development, trees and/or structures with City of Visalia—Shirk and Riggin Industrial Project
Draft EIR Executive Summary
ES-20
Impacts Mitigation Measures Level of Significance After Mitigation features capable of supporting roosting bats shall be surveyed by a qualified Biologist for bat roosts or evidence of bat roosting (guano, urine staining and scent, dead bats) not more than 14 days before the start of ground disturbance, including vegetation removal. If active roosts are discovered, a protection zone of no less than 50 feet around the active roost shall be established by the qualified Biologist. Disturbance may occur within the buffer once active roosting ceases, as determined by the qualified Biologist.
If roosts are determined to be present and must be removed, the bats shall be excluded from the roosting site before the tree or structure is removed.
A bat Exclusion Plan shall be reviewed and approved by the California Department of Fish and Wildlife (CDFW) prior to implementation.
Exclusion methods may include use of one-way doors at roost entrances (bats may leave, but not reenter), or sealing roost entrances when the site can be confirmed to contain no bats. Exclusion efforts shall be restricted during periods of sensitive activity (e.g., during hibernation or while females in maternity colonies are nursing young). Copies of the survey report shall be submitted to the lead agency as evidence of compliance. If no active roosts are located, then no minimization measures shall need to be implemented and no further mitigation under this MM BIO-1f shall be required.
Impact BIO-2: The proposed project would not have a
substantial adverse effect on any riparian habitat or
other sensitive natural community identified in local or regional plans, policies, and regulations or by the
California Department of Fish and Wildlife or United
States Fish and Wildlife Service.
No mitigation measures are required. Less than significant impact.
Impact BIO-3: The proposed project could have a
substantial adverse effect on State or federally
protected wetlands (including, but not limited to, marsh, vernal pool, coastal, etc.) through direct removal, filling, hydrological interruption, or other means.
MM BIO-3: The project developer shall submit the preliminary Jurisdictional Delineation (JD) and coordinate with the appropriate regulating agencies (Central Valley Regional Water Quality Control Board [RWQCB], California Department of Fish and Wildlife [CDFW] and the United States Army Corps of Engineers [USACE]) to determine whether the Modoc Ditch is protected under Section 404 and 401 of the Clean Water Act (CWA), Porter-Cologne Water Quality Control Act, and/or Fish and Game Code 1602.
Less than significant impact with
mitigation incorporated.
City of Visalia—Shirk and Riggin Industrial Project
Draft EIR Executive Summary
ES-21
Impacts Mitigation Measures Level of Significance After Mitigation If Modoc Ditch is considered jurisdictional by the regulating agencies, the relevant project developer shall, in accordance with all applicable laws and regulations, obtain the relevant permit applications based on coordination with the appropriate regulating agencies, if required prior to impacting any waters.
As part of these authorizations, compensatory mitigation may be required by the regulating agencies to offset the loss of aquatic resources. If so, and as part of the permit application process, a qualified professional shall draft a Mitigation and Monitoring Plan to address implementation and monitoring requirements under the permit(s) to ensure that the subject development proposal would result in no net loss of habitat functions and values. The Plan shall contain, at a minimum, mitigation goals and objectives, mitigation location, a discussion of actions to be implemented to mitigate the impact, monitoring methods and performance criteria, extent of monitoring to be conducted, actions to be taken in the event that the mitigation is not successful, and reporting requirements. The Plan shall be approved by the appropriate regulatory agencies and compensatory mitigation shall take place either on-site or at an appropriate off-site location, if required. Copies of the Plan and associated report shall be submitted to the lead agency as evidence of compliance.
Any material/spoils generated from project activities containing hazardous materials shall be located away from jurisdictional areas or special-status habitat and protected from stormwater runoff using temporary perimeter sediment barriers such as berms, silt fences, fiber rolls, covers, sand/gravel bags, and straw bale barriers, as appropriate and feasible. Protection measures should follow project-specific criteria as developed in a Storm Water Pollution Prevention and Protection Plan (SWPPP).
Equipment containing hazardous liquid materials shall be stored on impervious surfaces or plastic ground covers to prevent any spills or leakage from contaminating the ground and at least 50 feet outside the delineated boundary of jurisdictional water features.
Any spillage of material shall be stopped if it can be done safely and in a feasible manner. In the event of any such spillage, the contaminated area shall be cleaned by the party responsible for the spillage, and any City of Visalia—Shirk and Riggin Industrial Project
Draft EIR Executive Summary
ES-22
Impacts Mitigation Measures Level of Significance After Mitigation contaminated materials properly disposed. For all spills, the project foreman or designated environmental representative shall be notified.
Impact BIO-4: The proposed project could interfere
substantially with the movement of any native resident
or migratory fish or wildlife species or with established native resident or migratory wildlife corridors, or
impede the use of wildlife nursery sites.
Implement MM BIO-1e and MM BIO-1f. Less than significant impact with mitigation incorporated.
Impact BIO-5: The proposed project would not conflict
with any local policies or ordinances protecting
biological resources, such as a tree preservation policy or ordinance.
No mitigation measures are required. Less than significant impact.
Impact BIO-6: The proposed project would not conflict
with the provisions of an adopted Habitat Conservation
Plan, Natural Community Conservation Plan, or other
approved local, regional, or State Habitat Conservation Plan.
No mitigation measures are required. No impact.
Cumulative Impact: The proposed project would not
have a significant cumulative impact related to biological resources with mitigation incorporated.
MM BIO-1a through MM BIO-1f and MM BIO-3. Less than significant impact with mitigation incorporated.
Section 3.5—Cultural Resources and Tribal Cultural Resources Impact CUL-1: The proposed project would not cause a
substantial adverse change in the significance of a
historical resource pursuant to CEQA Guidelines Section 15064.5.
MM CUL-1: Archaeological Spot-Monitoring and Halt of Construction Upon Encountering Historical or Archaeological Materials Prior to any ground disturbance in connection with project development, a surface inspection of the relevant portion(s) of the project site shall be conducted by a qualified Archaeologist; a Tribal Monitor/Cultural Staff from a culturally affiliated Native American tribe identified by the Native American Heritage Commission (NAHC) shall be permitted to observe, subject to an executed agreement between the Tribe and the relevant applicant (as noted below). The Archaeologist (and Tribal Monitor/Cultural Staff, subject to an executed agreement with the relevant applicant) shall monitor the relevant portion(s) of the project site during initial ground disturbance activities that occur in connection with the subject proposal.
Less than significant impact with
mitigation incorporated.
City of Visalia—Shirk and Riggin Industrial Project
Draft EIR Executive Summary
ES-23
Impacts Mitigation Measures Level of Significance After Mitigation The relevant applicant shall offer, in good faith and based on commercially reasonable terms, a culturally affiliated Native American tribe identified by the NAHC the opportunity to provide a Native American Monitor during ground-disturbing activities that occur in connection with the subject proposal. Tribal participation would be dependent upon the availability and interest of the Tribe as well as the parties being able to reach mutually acceptable terms.
In addition, the relevant applicant shall with diligence and good faith coordinate with the Tribal Monitor/Cultural Staff to enter into an agreement on commercially reasonable terms wherein the Tribal Monitor/Cultural Staff shall provide pre- project-related activities training to supervisory personnel and any excavation contractor, which shall include information on potential cultural material finds and on the procedures to be enacted if Tribal Cultural Resources (TCRs) are found.
Subject to such an executed agreement, the Tribal Monitor/Cultural Staff shall provide the foregoing activities prior to any ground disturbance in connection with an individual specific development proposal.
In the event that TCRs are discovered during project-related subsurface construction activities, operations shall stop within 100 feet of the find and a qualified Archaeologist shall determine whether the resource requires further study. In consultation with the City of Visalia and consulting tribes, the qualified Archaeologist shall determine the measures that shall be implemented to protect the discovered resources, including, but not limited to, excavation of the finds and evaluation of the finds in accordance with CEQA Guidelines Section 15064.5. Measures may include avoidance, preservation in place, recordation, additional archaeological resting, and data recovery, among other options. Any previously undiscovered resources found during project-related subsurface construction activities shall be recorded on appropriate California Department of Parks and Recreation (DPR) forms and evaluated for significance. No further ground disturbance shall occur in the immediate vicinity of the discovery until approved by the qualified Archaeologist.
Impact CUL-2: The proposed project could cause a
substantial adverse change in the significance of an
Implement MM CUL-1.
MM CUL-2: Prior to the initiation of ground disturbance activities for project development, the relevant developer shall ensure that all Less than significant impact with
mitigation incorporated.
City of Visalia—Shirk and Riggin Industrial Project
Draft EIR Executive Summary
ES-24
Impacts Mitigation Measures Level of Significance After Mitigation archaeological resource pursuant to CEQA Guidelines
Section 15064.5.
construction personnel conducting ground disturbance at the project site in connection with the subject individual specific development proposal shall be provided a Worker Environmental Awareness Program (WEAP) cultural resources “tailgate” training. The training shall include visual aids, a discussion of applicable laws and statutes relating to archaeological resources, types of resources that may be found within the project site, and procedures to be followed in the event such resources are encountered. The training shall be conducted by an Archaeologist who meets the Secretary of the Interior’s Professional Qualification Standards for archaeology. Any Native American Monitors or representatives consulting on the proposed project shall be invited to attend and participate in the training session.
MM CUL-3: In the event that prehistoric or historic-period archaeological resources are encountered during construction in connection with an individual specific development proposal, all construction activities associated therewith within 100 feet of the find shall halt and the City of Visalia and an Archaeologist who meets the Secretary of the Interior’s Professional Qualification Standards for archaeology shall be notified by the relevant applicant. Prehistoric archaeological materials may include obsidian and chert flaked stone tools (e.g., projectile points, knives, scrapers) or toolmaking debris; culturally darkened soil (“midden”) containing heat-affected rocks, artifacts, or shellfish remains; stone milling equipment (e.g., mortars, pestles, hand stones, or milling slabs); and battered stone tools, such as hammerstones and pitted stones. Historic- period materials might include stone, concrete, or adobe footings and walls; filled wells or privies; and deposits of metal, glass, and/or ceramic refuse.
The Archaeologist shall inspect the findings within 24 hours of discovery or as soon thereafter as is reasonable and commercially practicable. If it is determined that the construction associated with the subject individual specific development proposal could significantly damage a historical resource or a unique archaeological resource (as defined pursuant to the CEQA Guidelines), mitigation shall be implemented in accordance with Public Resources Code Section 21083.2 and Section 15126.4 of the CEQA Guidelines, with a preference for preservation in place. If avoidance is not feasible, a qualified Archaeologist shall prepare and the relevant applicant City of Visalia—Shirk and Riggin Industrial Project
Draft EIR Executive Summary
ES-25
Impacts Mitigation Measures Level of Significance After Mitigation shall implement a detailed treatment plan in consultation with the City of Visalia. Treatment of unique archaeological resources shall follow the applicable requirements of Public Resources Code Section 21083.2.
Treatment for most resources would consist of (but would not be limited to) sample excavation, artifact collection, site documentation, and historical research, with the aim to target the recovery of important scientific data contained in the portion(s) of the significant resource to be impacted by the proposed project. The treatment plan shall include provisions for analysis of data in a regional context, reporting of results within a timely manner, curation of artifacts and data at an approved facility, and dissemination of reports to local and State repositories, libraries, and interested professionals.
Impact CUL-3: The proposed project could disturb
human remains, including those interred outside of
formal cemeteries.
MM CUL-4: In the event of the accidental discovery or recognition of any human remains during ground disturbance activities in connection with an individual specific development proposal, CEQA Guidelines Section 15064.5, Health and Safety Code Section 7050.5, and Public Resources Code Sections 5097.94 and 5097.98 shall be followed by the relevant applicant. Specifically, the following steps shall be taken:
1. There shall be no further excavation or disturbance within 100 feet of the remains until the County Coroner is contacted to determine whether the remains are Native American and if an investigation of the cause of death is required. If the Coroner determines the remains to be Native American, the Coroner shall contact the Native American Heritage Commission (NAHC) within 24 hours, and the NAHC shall identify the person or persons it believes to be the Most Likely Descendant (MLD) of the deceased Native American. The MLD may make recommendations to the landowner or the person responsible for the excavation work within 48 hours, for means of treating or disposing of, with appropriate dignity, the human remains, and any associated grave goods as provided in Public Resource Code Section 5097.98.
2. Where any of the following conditions occur, the landowner or his or her authorized representative shall rebury the Native American human remains and associated grave goods with appropriate dignity, either in accordance with the recommendations of the MLD or on the project site in a location not subject to further subsurface disturbance:
Less than significant impact with
mitigation incorporated.
City of Visalia—Shirk and Riggin Industrial Project
Draft EIR Executive Summary
ES-26
Impacts Mitigation Measures Level of Significance After Mitigation • The NAHC is unable to identify an MLD.
• The identified MLD fails to make a recommendation within 48 hours after being notified by the commission.
• The landowner or his or her authorized representative rejects the recommendation of the identified MLD and mediation by the NAHC fails to provide measures acceptable to the landowner.
Additionally, California Public Resources Code Section 15064.5 requires the following relative to Native American remains:
• When an initial study identifies the existence of, or the probable likelihood of, Native American remains within a project, a lead agency shall work with the appropriate Native Americans as identified by the NAHC as provided in Public Resources Code Section 5097.98. Each relevant applicant in connection with its individual specific development proposal may develop a plan for treating or disposing of, with appropriate dignity, the human remains and any items associated with Native American burials with the appropriate Native Americans as identified by the NAHC.
Impact CUL-4: The proposed project may cause a
substantial adverse change in the significance of a Tribal Cultural Resource, defined in Public Resources Code
Section 21074 as either a site, feature, place, cultural landscape that is geographically defined in terms of the size and scope of the landscape, sacred place, or object with cultural value to a California Native American tribe, and that is listed or eligible for listing in the California Register of Historical Resources, or in a local register of historical resources as defined in Public Resources Code Section 5020.1(k).
Implement MM CUL-1 through MM CUL-4. Less than significant impact with mitigation incorporated.
Impact CUL-5: The proposed project may cause a
substantial adverse change in the significance of a tribal cultural resource, defined in Public Resources Code
Section 21074 as either a site, feature, place, cultural landscape that is geographically defined in terms of the size and scope of the landscape, sacred place, or object Implement MM CUL-1 through MM CUL-4. Less than significant impact with mitigation incorporated.
City of Visalia—Shirk and Riggin Industrial Project
Draft EIR Executive Summary
ES-27
Impacts Mitigation Measures Level of Significance After Mitigation with cultural value to a California Native American tribe, and that is a resource determined by the lead agency, in its discretion and supported by substantial evidence, to be significant pursuant to criteria set forth in subdivision (c) of Public Resources Code Section 5024.1.
Cumulative Impact: The proposed project could have a
significant cumulative impact related to cultural
resources.
Implement MM CUL-1 through MM CUL-4. Less than significant impact with mitigation incorporated.
Section 3.6—Energy
Impact ENER-1: The proposed project would not result
in potentially significant environmental impact due to
wasteful, inefficient, or unnecessary consumption of
energy resources, during project construction or
operation.
None required. Less than significant impact.
Impact ENER-2: The proposed project would not conflict
with or obstruct a State or local plan for renewable
energy or energy efficiency.
None required. Less than significant impact.
Cumulative Impact: The proposed project would have a
less than significant impact related to energy.
None required. Less than significant impact.
Section 3.7—Geology and Soils
Impact GEO-1a: The proposed project would not directly
or indirectly cause potential substantial adverse effects, including the risk of loss, injury or death involving:
i) Rupture of a known earthquake fault, as delineated
on the most recent Alquist-Priolo Earthquake Fault
Zoning Map issued by the State Geologist for the area
or based on other substantial evidence of a known
fault? Refer to Division of Mines and Geology Special
Publication 42.
No mitigation measures are required. Less than significant impact.
Impact GEO-1b: The proposed project could directly or
indirectly cause potential substantial adverse effects, including the risk of loss, injury or death involving:
MM GEO-1: Prior to issuance of the grading permit for each project development, the final grading, foundation, and construction plans for the subject proposal shall incorporate all the site-specific earthwork, Less than significant impact with
mitigation incorporated.
City of Visalia—Shirk and Riggin Industrial Project
Draft EIR Executive Summary
ES-28
Impacts Mitigation Measures Level of Significance After Mitigation ii) Strong seismic ground shaking. foundation, floor slab, lateral earth pressure, and pavement design recommendations, as detailed in a Geotechnical Evaluation prepared by a qualified Geotechnical Engineer. The final grading and construction plans for the subject individual specific development shall be reviewed by the City-approved Geotechnical Engineer to confirm compliance with this mitigation measure. Grading operations performed in connection with the subject individual specific development proposal shall satisfy all applicable recommendations included in the Geotechnical Evaluation.
During construction performed in connection with the specific development, the City-approved Geotechnical Engineer shall monitor this construction to ensure the earthwork operations are properly performed in accordance with the foregoing requirements.
Impact GEO-1c: The proposed project would not directly
or indirectly cause potential substantial adverse effects, including the risk of loss, injury or death involving:
iii) Seismic-related ground failure, including liquefaction.
No mitigation measures are required. Less than significant impact.
Impact GEO-1d: The proposed project would not directly
or indirectly cause potential substantial adverse effects, including the risk of loss, injury or death involving:
iv) Landslides.
No mitigation measures are required. Less than significant impact.
Impact GEO-2: The proposed project would not result in
substantial soil erosion or the loss of topsoil.
MM GEO-2: In order to reduce on-site erosion due to project construction and operation, an erosion control plan and Storm Water Pollution Prevention Plan (SWPPP) shall be prepared for the site preparation, construction, and post-construction periods by a registered civil engineer or certified professional. The erosion control plan shall incorporate Best Management Practices (BMPs) consistent with the requirements of the National Pollutant Discharge Elimination System (NPDES). The erosion component of the plan must at least meet the requirements of the SWPPP required by the Central Valley Regional Water Quality Control Board (RWQCB). If earth-disturbing activities are proposed between October 15 and April 15, these activities shall be limited to the extent feasible to minimize potential erosion-related impacts. Additional erosion control measures may be implemented in consultation with the City of Visalia.
Prior to the issuance of any permit, the project proponent shall submit detailed plans to the satisfaction of the City of Visalia. The components of Less than significant impact with
mitigation incorporated.
City of Visalia—Shirk and Riggin Industrial Project
Draft EIR Executive Summary
ES-29
Impacts Mitigation Measures Level of Significance After Mitigation the erosion control plan and SWPPP shall be monitored for effectiveness by the City of Visalia. Erosion control measures may include, but not be limited to, the following:
i. Limit disturbance of soils and vegetation disturbance removal to the minimum area necessary for access and construction;
ii. Confine all vehicular traffic associated with construction to the right- of-way of designated access roads;
iii. Adhere to construction schedules designed to avoid periods of heavy precipitation or high winds;
iv. Ensure that all exposed soil is provided with temporary drainage and soil protection when construction activity is shut down during the winter periods; and
v. Inform construction personnel prior to construction and periodically during construction activities of environmental concerns, pertinent laws and regulations, and elements of the proposed erosion control measures.
Impact GEO-3: The proposed project could be located
on a geologic unit or soil that is unstable, or that would become unstable as a result of the proposed project,
and potentially result in on- or off-site landslide, lateral spreading, subsidence, liquefaction or collapse.
Implement MM GEO-1. Less than significant impact with
mitigation incorporated.
Impact GEO-4: The proposed project could be located
on expansive soil, as defined in Table 18-1-B of the
Uniform Building Code (1994), creating substantial direct or indirect risks to life or property.
Implement MM GEO-1. Less than significant impact with
mitigation incorporated.
Impact GEO-5: The proposed project would not have
soils incapable of adequately supporting the use of
septic tanks or alternative wastewater disposal systems where sewers are not available for the disposal of
wastewater.
No mitigation measures are required. No impact.
Impact GEO-6: The proposed project could directly or
indirectly destroy a unique paleontological resource or site or unique geologic feature.
MM GEO-3: In the event a fossil is discovered during construction performed in connection with project development, the relevant project developer/contractor shall cease ground-disturbing activities within 15 feet of the find. The qualified Paleontologist shall evaluate the significance of the resources and recommend appropriate treatment measures which Less than significant impact with
mitigation incorporated.
City of Visalia—Shirk and Riggin Industrial Project
Draft EIR Executive Summary
ES-30
Impacts Mitigation Measures Level of Significance After Mitigation shall be implemented by the relevant applicant. In addition, all recovered fossils should be deposited in an appropriate repository, such as the University of California Museum of Paleontology, located on the campus of the University of California, Berkeley, where they will be properly curated and made accessible for future study.
Cumulative Impact: The proposed project would not
have a significant cumulative impact with mitigation
incorporated.
MM GEO-1, MM GEO-2, and MM GEO-3. Less than significant impact with mitigation incorporated.
Section 3.8—Greenhouse Gas Emissions
Impact GHG-1: The proposed project would not
generate greenhouse gas emissions, either directly or
indirectly, that may have a significant impact on the
environment.
None required. Less than significant impact.
Impact GHG-2: The proposed project could conflict with
any applicable plan, policy or regulation of an agency
adopted for the purpose of reducing the emissions of
greenhouse gases.
Implement MM AIR-2d and
MM GHG-2a: Rooftop Solar
Prior to issuance of the first building permit in connection with an individual specific development proposal, the relevant project applicant shall provide the City of Visalia Planning Department reasonable documentation demonstrating that each of the buildings that are covered by the subject individual specific development proposal would be designed with one of the following: (i) rooftop photovoltaic solar panels, (ii) solar- ready rooftop design that shall support the installation of rooftop photovoltaic panel, as feasible, or (iii) roofing material contains light coloring with a solar reflective index greater than 78.
MM GHG-2b: Warehouse usage shall be limited to dry storage. If the warehouse is used for cold storage, then prior to the issuance of occupancy permits, the City of Visalia shall confirm that tenant lease agreements include contractual language that requires all Transport Refrigeration Units (TRUs) entering the project site be plug-in capable.
Electrical hookups shall be provided as part of the tenant improvements for any tenant that requires cold storage. The electrical hookups shall be provided at loading bays for truckers to plug in any onboard auxiliary equipment and power refrigeration units while their truck is stopped.
Less than significant impact with
mitigation incorporated.
City of Visalia—Shirk and Riggin Industrial Project
Draft EIR Executive Summary
ES-31
Impacts Mitigation Measures Level of Significance After Mitigation Cumulative Impact: The proposed project could have a
significant cumulative impact related to greenhouse gas emissions.
Implement MM AIR-2d, MM GHG-2a, and MM GHG-2b. Less than significant impact with mitigation incorporated.
Section 3.9—Hazards and Hazardous Materials
Impact HAZ-1: The proposed project could create a
significant hazard to the public or the environment
through the routine transport, use, or disposal of
hazardous materials.
No mitigation measures are required. Less than significant impact.
Impact HAZ-2: The proposed project could create a
significant hazard to the public or the environment
through reasonably foreseeable upset and accident
conditions involving the likely release of hazardous
materials into the environment.
MM HAZ-1
(a) Any known wells on the project site shall be delineated on an engineered site plan with a minimum 10-foot
radius no build area.
(b) In the event that any abandoned or unrecorded wells are uncovered or damaged during excavation or grading
activities, all work shall cease in the vicinity of the well, and the California Department of Conservation Geologic
Energy Management (CalGEM), shall be contacted for
requirements and approval; copies of said approvals
shall be submitted to the City of Visalia Community
Development Department. CalGEM may determine that
remedial plugging operations may be required.
(c) The following note shall appear on all final maps and grading plans: “If during grading or construction, any
plugged and abandoned or unrecorded wells are
uncovered or damaged, CalGEM will be contacted to
inspect and approve any remediation required.
Less than significant impact with
mitigation incorporated.
Impact HAZ-3: The proposed project would not emit
hazardous emissions or handle hazardous or acutely
hazardous materials, substances, or waste within one-
quarter mile of an existing or proposed school.
No mitigation measures are required. Less than significant impact.
Impact HAZ-4: The proposed project would not be
located on a site which is included on a list of hazardous materials sites compiled pursuant to Government Code
No mitigation measures are required. No impact.
City of Visalia—Shirk and Riggin Industrial Project
Draft EIR Executive Summary
ES-32
Impacts Mitigation Measures Level of Significance After Mitigation Section 65962.5 and, as a result, would it create a
significant hazard to the public or the environment.
Impact HAZ-5: For a project located within an airport
land use plan or, where such a plan has not been
adopted, within two miles of a public airport or public use airport, the proposed project would not result in a safety hazard or excessive noise for people residing or working the project area.
No mitigation measures are required. Less than significant impact.
Impact HAZ-6: The proposed would not impair
implementation of or physically interfere with an
adopted emergency response plan or emergency
evacuation plan.
No mitigation measures are required. Less than significant impact.
Impact HAZ-7: The proposed project would not expose
people or structures, either directly or indirectly to a significant risk of loss, injury or death involving wildland fires.
No mitigation measures are required. Less than significant impact.
Cumulative Impact: The proposed project would have a
less than significant impact related to hazards and
hazardous materials with mitigation incorporated.
Implement MM HAZ-1. Less than significant impact with
mitigation incorporated.
Section 3.10—Hydrology and Water Quality
Impact HYD-1: The proposed project would not violate
any water quality standards or waste discharge
requirements or otherwise substantially degrade surface or ground water quality.
Implement MM GEO-2. Less than significant impact with
mitigation incorporated.
Impact HYD-2: The proposed project would not
substantially decrease groundwater supplies or interfere substantially with groundwater recharge such that the
project may impede sustainable groundwater
management of the basin.
No mitigation measures are required. Less than significant impact.
Impact HYD-3: The proposed project would not
substantially alter the existing drainage pattern of the site or area, including through the alteration of the
Implement MM GEO-2. Less than significant impact with
mitigation incorporated.
City of Visalia—Shirk and Riggin Industrial Project
Draft EIR Executive Summary
ES-33
Impacts Mitigation Measures Level of Significance After Mitigation course of a stream or river or through the addition of
impervious surfaces, in a manner which would:
i. result in substantial erosion or siltation on- or off-site; ii. substantially increase the rate or amount of surface runoff in a manner which would result in flooding on-
or off-site;
iii. create or contribute runoff water which would exceed the capacity of existing or planned stormwater
drainage systems or provide substantial additional
sources of polluted runoff; or
iv. impede or redirect flood flows?
Impact HYD-4: The proposed project would not be
located in a flood hazard zone, tsunami, or seiche zone, or risk release of pollutants due to project inundation.
No mitigation measures are required. Less than significant impact.
Impact HYD-5: The proposed project would not conflict
with or obstruct implementation of a water quality
control plan or sustainable groundwater management
plan.
No mitigation measures are required. Less than significant impact.
Cumulative Impact: The proposed project would have a
less than significant impact related to hydrology and
water quality.
Implement MM GEO-2. Less than significant impact with
mitigation incorporated.
Section 3.11—Land Use and Planning
Impact LAND-1: The proposed project would not
physically divide an established community.
No mitigation measures are required. Less than significant impact.
Impact LAND-2: The proposed project would not cause a
significant environmental impact due to a conflict with any land use plan, policy, or regulation adopted for the purpose of avoiding or mitigating an environmental
effect.
No mitigation measures are required. Less than significant impact.
Cumulative Impact: The proposed project would not
have a cumulative impact related to land use and
planning.
No mitigation measures are required. Less than significant impact.
City of Visalia—Shirk and Riggin Industrial Project
Draft EIR Executive Summary
ES-34
Impacts Mitigation Measures Level of Significance After Mitigation Section 3.12—Noise
Impact NOI-1: The proposed project would generate a
substantial temporary or permanent increase in ambient
noise levels in the vicinity of the project in excess of standards established in the local general plan or noise ordinance, or applicable standards of other agencies.
MM NOI-1:
(a) Prior to the issuance of building permit for a drive-through car wash, an in-depth acoustical study prepared by a qualified acoustic professional shall be submitted for review and approval to the City Community Development Department that demonstrates that the design and operations of a proposed drive-through car wash would not result in exceedances of the Visalia Municipal Code’s applicable daytime and nighttime noise limits for residential land uses. The study shall evaluate factors such as:
• The location and orientation of noise-generating equipment, such as dryer blowers and vacuums.
• The location and orientation of the drive-through car wash tunnel. • The hours of operation.
• The location of the drive-through car wash on the project site.
(b) Based on the results of the acoustical study, the project applicant shall be required to incorporate, at a minimum, design features or reduction measures to reduce any identified operational noise impact to meet applicable noise performance criteria. These reduction measures shall be included on all relevant plans, specifications, and other permitting documents. Measures and design features may include, but are not limited to the following:
• Locating the car wash facility further away from sensitive receptors, therefore reducing its noise impacts at nearby residential land uses. • Orienting the facility so that the carwash exit (where the drying blowers would be located) is located facing away from nearby residential land uses.
• Providing sound blankets to hang around the edge of the carwash exit tunnel to help shield the dryer blower noise.
• Locating the dryer blowers further inside the car wash tunnel to help shield the dryer blower noise.
• Providing screening, such as a structure or sound wall, to shield the carwash exit where the dryer blowers would be located from nearby residential land uses.
Significant and unavoidable impact.
City of Visalia—Shirk and Riggin Industrial Project
Draft EIR Executive Summary
ES-35
Impacts Mitigation Measures Level of Significance After Mitigation MM NOI-2:
(a) When specific uses within the project area are proposed that could result in a noise-related conflict between an industrial or other stationary noise source and existing or future noise-sensitive receptors, an acoustical analysis shall be required by the City that quantifies the proposed use’s operational noise levels and recommends appropriate reduction measures, as necessary, to achieve compliance with the City’s noise standards. The analysis shall be prepared by a qualified acoustic professional. All recommended design features or reduction measures shall be noted on plans, specifications, and other relevant permitting documents prior to the issuance of building permits.
(b) Based on the results of the acoustical study, the project applicant shall be required to incorporate, at a minimum, design features or reduction measures to reduce any identified operational noise impact to meet applicable noise performance criteria. Reduction measures and design features may include, but are not limited to the following:
• Locating the warehouse facility further away from sensitive receptors, therefore reducing its noise impacts at nearby residential land uses.
• Orienting the facility so that the warehouse truck loading/unloading areas are located facing away from nearby residential land uses. • Providing gasket loading dock doors to help shield truck loading and unloading noise.
• Providing screening, such as a structure or sound wall, to shield truck loading and unloading areas from nearby residential land uses.
Impact NOI-2: The proposed project would not result in
generation of excessive groundborne vibration or
groundborne noise levels.
None required. Less than significant impact.
Impact NOI-3: The proposed project would not expose
people residing or working in the project area to
excessive noise levels for a project located within the vicinity of a private airstrip or an airport land use plan or, where such a plan has not been adopted, within two
miles of a public airport or public use airport.
None required. No impact.
City of Visalia—Shirk and Riggin Industrial Project
Draft EIR Executive Summary
ES-36
Impacts Mitigation Measures Level of Significance After Mitigation Cumulative Impact: The proposed project would have a
significant and unavoidable impact related to cumulative traffic noise impacts.
None available. Significant and unavoidable impact.
Section 3.13—Public Services
Impact PUB-1: The proposed project would not result in
substantial adverse physical impacts associated with the provision of new or physically altered governmental
facilities, need for new or physically altered
governmental facilities, the construction of which could cause significant environmental impacts, in order to
maintain acceptable service ratios, response times or
other performance objectives for fire protection and
emergency medical services.
No mitigation measures are required. Less than significant impact.
Impact PUB-2: The proposed project would not result in
substantial adverse physical impacts associated with the provision of new or physically altered governmental
facilities, need for new or physically altered
governmental facilities, the construction of which could cause significant environmental impacts, in order to
maintain acceptable service ratios, response times or
other performance objectives for police protection.
No mitigation measures are required. Less than significant impact.
Impact PUB-4: The proposed project would not result in
substantial adverse physical impacts associated with the provision of new or physically altered governmental park facilities, need for new or physically altered
governmental facilities, the construction of which could cause significant environmental impacts, in order to
maintain acceptable service ratios, response times or
other performance objectives for parks or other
recreational facilities.
No mitigation measures are required. Less than significant impact.
Impact PUB-5: The proposed project would not result in
substantial adverse physical impacts associated with the provision of new or physically altered governmental
library facilities, need for new or physically altered
No mitigation measures are required. Less than significant impact.
City of Visalia—Shirk and Riggin Industrial Project
Draft EIR Executive Summary
ES-37
Impacts Mitigation Measures Level of Significance After Mitigation governmental facilities, the construction of which could cause significant environmental impacts, in order to
maintain acceptable service ratios, response times or
other performance objectives for other public facilities, such as libraries.
Cumulative Impact: The proposed project would not
result in cumulative impacts related to public services.
No mitigation measures are required. Less than significant impact.
Section 3.14—Transportation and Traffic
Impact TRANS-1: The proposed project could conflict
with a program plan, ordinance or policy of the
circulation system, including transit, roadways, bicycle and pedestrian facilities.
MM TRANS-1: Prior to the issuance of building permits, the project shall comply with the City’s Active Transportation Plan (ATP) and dedicate 28 feet for a pedestrian trail along the south side of Modoc Ditch.
MM TRANS-2: Prior to the building permits, the developer shall appropriate Storm Drainage and Waterways impact fees.
MM TRANS-3: Plaza Drive and Riggin Avenue: Prior to the issuance of grading permits the proposed project shall provide site plans that show modification of the raised median to extend the existing westbound left- turn pocket by 100 feet, to provide a 400-foot left-turn pocket. The existing northbound right-turn stripe shall be extended to 300 feet. These improvements shall occur in the year 2026. The project proponent shall be financially responsible for these improvements. “Financially responsible” shall equate to implementing the project as well as paying for the project.
MM TRANS-4: Shirk Street and Riggin Avenue: The proposed project shall provide dual northbound left-turn pockets (300-foot minimum) and a 300- foot minimum southbound left-turn pocket. Since a 300-foot eastbound right-turn pocket would already be installed by the Capital Improvement Plan (CIP) project, additional recommendations are not proposed. These improvements shall occur in the year 2025. The project’s contribution into the Transportation Impact Fees (TIF) will assist in paying for these improvements.
MM TRANS-5: Shirk Street and Ferguson Avenue: Prior to the issuance of final occupancy of any project area, the proposed project shall signalize the intersection, subject to pro rata cost sharing with the adjacent Carlton Acres Specific Plan project. This improvement would allow the intersection Less than significant impact with
mitigation incorporated.
City of Visalia—Shirk and Riggin Industrial Project
Draft EIR Executive Summary
ES-38
Impacts Mitigation Measures Level of Significance After Mitigation to operate at an acceptable Level of Service (LOS) for the deficient scenarios, while reducing the vehicles queues for all intersection turn pockets below the storage capacity. Costs of implementing MM TRANS-5 are expected to be shared by Carlton Acres Specific Plan (CASP) and the proposed project as it provides access to both sites.
MM TRANS-6: Roeben Street and Ferguson Avenue: Prior to final occupancy of any portion of Phase 3, the proposed project shall make a
26.2 percent fair share contribution toward signalizing this intersection.
Based on the estimated signalization and interconnect cost of $500,000, the proposed project shall contribute up to $131,000 for these future improvements.
MM TRANS-7: Akers Street and Riggin Avenue: The proposed project shall provide an additional northbound left-turn pocket and through lane and provide an additional eastbound/westbound through lane. Costs of implementing MM TRANS-7 are expected to be shared by Carlton Acres Specific Plan (CASP), the proposed project, and others as it provides access to multiple sites under development.
MM TRANS-8: Akers Street and Ferguson Avenue: The proposed project shall provide an additional northbound/southbound through lane and right-turn pocket (150-foot minimum) and provide an eastbound right-turn pocket (150-foot minimum). Costs of implementing MM TRANS-8 are expected to be shared by Carlton Acres Specific Plan (CASP) and the proposed project as it provides access to both sites.
MM TRANS-9: Akers Street and Goshen Avenue: The proposed project shall modify the raised median to extend the existing southbound left-turn pocket to 400 feet. It is not recommended to exceed this length further in order to maintain access to the existing driveway north of the intersection.
The existing southbound right-turn stripe shall be extended to 400 feet minimum. Costs of implementing MM TRANS-9 are expected to be shared by Carlton Acres Specific Plan (CASP) and the proposed project as it provides access to both sites.
Impact TRANS-2: The proposed project could conflict or
be inconsistent with CEQA Guidelines Section 15064.3,
subdivision (b).
MM TRANS-10a: Prior to the issuance of building permits, the site plan shall include the location of up to six secured bicycle storage lockers near each of the buildings entrances and the future transit stop. Up to 10 Less than significant impact with
mitigation incorporated.
City of Visalia—Shirk and Riggin Industrial Project
Draft EIR Executive Summary
ES-39
Impacts Mitigation Measures Level of Significance After Mitigation potential locations shall be included, for a total of up to 60 lockers throughout the site.
Lockers shall be provided for approximately 1.5 percent of the 4,178 site’s daily employees with flexibility to add future lockers based on demand.
MM TRANS-10b: Prior to final occupancy of any portion of Phase 1, the developer shall construct a bike path along Modoc Ditch, between Kelsey Street and Shirk Street (approximately 1-mile).
The existing Class I bike path along Modoc ditch runs to the east of the proposed project, between Dinuba Boulevard and the St. John’s River Trail.
The Carlton Acres Specific Plan (CASP) project also proposed to construct a portion of the Class I path within the site. Therefore, the bike path shall connect to a new path proposed within the CASP site and future segments to the east and west. This mitigation is subject to contractability and approval by Cal Water.
Impact TRANS-3: The proposed project could
substantially increase hazards due to a geometric design feature (e.g., sharp curves or dangerous intersections) or incompatible uses (e.g., farm equipment).
MM TRANS-11: Prior to the issuance of construction permits, the project developer shall prepare and submit a Construction Traffic Control Plan to the City of Visalia for approval and implement the approved Construction Traffic Control Plan during construction. The Construction Traffic Control Plan shall be prepared in accordance with both the California Department of Transportation Manual on Uniform Traffic Control Devices and Work Area Traffic Control Handbook and shall include, but not be limited to, the following issues:
a. Timing of deliveries of heavy equipment and building materials; b. Directing construction traffic with a flag person;
c. Placing temporary signing, lighting, and traffic control devices if required, including, but not limited to, appropriate signage along access routes to indicate the presence of heavy vehicles and construction traffic;
d. Ensuring access for emergency vehicles to the project site; e. Temporarily closing travel lanes or delaying traffic during materials delivery, transmission line stringing activities, or any other utility connections;
f. Maintaining access to adjacent property; and,
g. Specifying both construction-related vehicle travel and oversize load haul routes, minimizing construction traffic during the AM and PM Less than significant impact with
mitigation incorporated.
City of Visalia—Shirk and Riggin Industrial Project
Draft EIR Executive Summary
ES-40
Impacts Mitigation Measures Level of Significance After Mitigation peak-hour, distributing construction traffic flow across alternative routes to access the project sites, and avoiding residential neighborhoods to the maximum extent feasible.
Impact TRANS-4: The proposed project could result in
inadequate emergency access.
Implement MM TRANS-11. Less than significant impact with mitigation incorporated.
Cumulative Impact: Impacts related to transportation
would be less than significant with mitigation
incorporated.
Implement MM TRANS-1 through MM TRANS-11. Less than significant impact with mitigation incorporated.
Section 3.15—Utilities and Service Systems
Impact UTIL-1: The proposed project would not require
or result in the relocation or construction of new or
expanded water, wastewater treatment or stormwater
drainage, electric power, natural gas, or
telecommunications facilities, the construction or
relocation of which could cause significant
environmental effects?
None required. Less than significant impact.
Impact UTIL-2: The proposed project would have
sufficient water supplies available to serve the project and reasonably foreseeable future development during
normal, dry and multiple dry years?
None required. Less than significant impact.
Impact UTIL-3: The proposed project would result in a
determination by the wastewater treatment provider
which serves or may serve the project that it has
adequate capacity to serve the project’s projected
demand in addition to the provider’s existing
commitments.
None required. Less than significant impact.
Impact UTIL-4: The proposed project could generate
solid waste in excess of State or local standards, or in excess of the capacity of local infrastructure, or
otherwise impair the attainment of solid waste
reduction goals?
MM UTIL 1: Debris and waste generated shall be recycled to the extent feasible.
The provisions listed below shall apply to the project during construction activities in connection with project development.
a. An on-site Recycling Coordinator shall be designated by the project proponent/contractor to facilitate recycling.
Less than significant impact with
mitigation incorporated.
City of Visalia—Shirk and Riggin Industrial Project
Draft EIR Executive Summary
ES-41
Impacts Mitigation Measures Level of Significance After Mitigation b. The Recycling Coordinator shall facilitate recycling of all construction waste through coordination with contractors, local waste haulers, and/or other facilities that recycle construction/demolition wastes. c. The on-site Recycling Coordinator shall also be responsible for ensuring wastes requiring special disposal are handled according to State and County regulations that are in effect at the time of disposal. d. Contact information of the coordinator shall be provided to the City of Visalia prior to issuance of building permits.
e. The project proponent/operator shall provide a storage area for recyclable materials within the fenced project area that is clearly identified for recycling. This area shall be maintained on the site during construction and operations. A site plan showing the recycling storage area shall be submitted prior to the issuance of any grading or building permit for the site.
Impact UTIL-5: The proposed project would comply with
federal, State, and local statutes and regulations related to solid waste.
None required. Less than significant impact.
Cumulative Impact: Impacts related to utilities would be less than significant with mitigation incorporated.
Implement MM UTIL-1. Less than significant impact with
mitigation incorporated.
Section 3.16—Wildfire
Impact WILD-1: The proposed project would not be
located in or near an SRA or lands classified as a VHFHSZ and would not substantially impair an adopted
emergency response plan or emergency evacuation
plan.
No mitigation is necessary. Less than significant impact.
Impact WILD-2: The proposed project would not be
located in or near an SRA or lands classified as a VHFHSZ, and would not due to slope, prevailing winds, and other factors, exacerbate wildfire risks and thereby expose
project occupants to pollutant concentrations from a
wildfire or the uncontrolled spread of a wildfire.
No mitigation measures are required. Less than significant impact.
Impact WILD-3: The proposed project would not be
located in or near an SRA or lands classified as a VHFHSZ and would not require the installation or maintenance of No mitigation measures are required. Less than significant impact.
City of Visalia—Shirk and Riggin Industrial Project
Draft EIR Executive Summary
ES-42
Impacts Mitigation Measures Level of Significance After Mitigation associated infrastructure (such as roads, fuel breaks,
emergency water sources, power lines or other utilities) that may exacerbate fire risk or that may result in
temporary or ongoing impacts to the environment.
Impact WILD-4: The proposed project would not be
located in or near an SRA or lands classified as a VHFHSZ, and would not expose people or structures to significant risks, including downslope or downstream flooding or
landslides, as a result of runoff, post-fire slope
instability, or drainage changes.
No mitigation measures are required. Less than significant impact.
Cumulative Impact: The proposed project would not
have a significant cumulative impact related to wildfire.
No mitigation measures are required. Less than significant impact.
City of Visalia—Shirk and Riggin Industrial Project
Draft EIR Introduction
1-1
CHAPTER 1: INTRODUCTION
1.1 - Overview of the CEQA Process
This Draft Environmental Impact Report (Draft EIR) is prepared in accordance with the California Environmental Quality Act (CEQA) to evaluate the potential environmental impacts associated with the implementation of the Shirk and Riggin Industrial Project (State Clearinghouse [SCH] No. 2022080658) This document is prepared in conformance with CEQA (California Public Resources Code [PRC], § 21000, et seq.) and the CEQA Guidelines (California Code of Regulations [CCR], Title 14, § 15000, et seq.). In accordance with Sections 21067, 15367, and 15050–15053 of the CEQA Guidelines, the City of Visalia (City) is the lead agency under whose authority this document has been prepared. As an informational document, this Draft EIR is intended to serve as an informational document for the public agency decision-makers and the public regarding the proposed project.
1.1.1 - Overview
The project applicant proposes to convert existing agricultural lands and develop the approximately 284-acre project site into an industrial park, consisting of eight industrial buildings used for warehouse, distribution, and light manufacturing; six flex industrial buildings; two drive-thru restaurants; a convenience store; a recreational vehicle (RV) and self storage facility; and a car wash.
The total building footprint is approximately 3,720,149 square feet. The project site would include sufficient amounts of trailer stalls and car parking stalls to serve the proposed uses in accordance with applicable City requirements. The proposed project would also involve necessary infrastructure and improvements sufficient to serve the proposed uses. These would include detention basins on the east, west, and central portions of the project site and other necessary stormwater facilities to be sized and installed in accordance with all applicable requirements and standards. Access would be provided via three access points along Shirk Street, three access points along Riggin Avenue, and five access points along Kelsey Street. Clancy Street south of the project site would be extended to replace the existing private road and would traverse south to north of the site. On-site orchards would need to be removed, and appropriate landscaping and lighting, consistent with applicable City requirements and guidelines, would be incorporated into the overall site design.
The proposed project would need to be annexed into the City limits and, upon annexation, would be served by the City of Visalia for purposes of water and wastewater. In addition, the other entitlements associated with this project include a Tentative Parcel Map and a Conditional Use Permit for some of the uses proposed (convenience store, drive-thru lanes), some of the proposed lot sizes in the light industrial zoning, and lots without public street frontage.
Chapter 2, Project Description provides a complete description of the proposed project.
1.1.2 - Purpose and Authority
This Draft EIR provides a project-level analysis of the environmental effects of the Shirk and Riggin Industrial Project. The environmental impacts of the proposed project are analyzed in the EIR to the degree of specificity appropriate, in accordance with CEQA Guidelines Section 15146. This document City of Visalia—Shirk and Riggin Industrial Project
Introduction Draft EIR
1-2
addresses the potentially significant adverse environmental impacts that may be associated with the planning, construction, or operation of the project. It also identifies appropriate and feasible mitigation measures and alternatives that may be adopted to significantly reduce or avoid these impacts.
CEQA requires that an EIR contain, at a minimum, certain specific elements. These elements are contained in this Draft EIR and include:
• Table of Contents
• Introduction
• Executive Summary
• Project Description
• Environmental Setting, Significant Environmental Impacts, and Mitigation Measures • Cumulative Impacts
• Significant Unavoidable Adverse Impacts
• Alternatives to the Proposed Project
• Growth-Inducing Impacts
• Effects Found not to be Significant
• Areas of Known Controversy
1.1.3 - Lead Agency Determination
The City of Visalia is designated as the lead agency for the project. CEQA Guidelines Section 15367 defines the lead agency as “. . . the public agency, which has the principal responsibility for carrying out or approving a project.” Other public agencies may use this Draft EIR in the decision-making or permit process and consider the information in this Draft EIR along with other information that may be presented during the CEQA process.
This Draft EIR was prepared by FirstCarbon Solutions (FCS), an environmental consultant. Prior to public review, it was extensively reviewed and evaluated by the City of Visalia. This Draft EIR reflects the independent judgment and analysis of the City of Visalia as required by CEQA. Lists of organizations and persons consulted and the report preparation personnel is provided in Section 7 of this Draft EIR.
1.2 - Scope of the EIR
This Draft EIR addresses the potential environmental effects of the proposed project. The City of Visalia issued a Notice of Preparation (NOP) for the proposed project on August 30, 2022, which circulated between August 30, 2022, and September 28, 2022, for the statutory 30-day public review period. The scope of this Draft EIR includes the potential environmental impacts identified in the NOP and issues raised by agencies and the public in response to the NOP. The NOP is contained in Appendix A of this Draft EIR.
Pursuant to Section 15083 of the CEQA Guidelines, the NOP provided notice that the City would hold a public scoping meeting on September 13, 2022, at 5:30 p.m. Pacific Standard Time (PST) at the City Hall East Conference Room and via a videoconference platform. At this meeting, attendees were City of Visalia—Shirk and Riggin Industrial Project
Draft EIR Introduction
1-3
given an opportunity to provide comments and express concerns about the potential effects of the proposed project; however, no public comments were received during the scoping meeting.
One comment letter was received in response to the NOP during the 30-day public review period.
Two comment letters were received after the close of the 30-day public review period but were considered, nonetheless. The three letters are listed in Table 1-1 and provided in Appendix A of this Draft EIR.
Table 1-1: NOP Comment Letters
Agency/Organization Author Date Comment Summary
Coverage in the
Draft EIR
Public Agencies
Native American
Heritage
Commission
Cameron
Vela, Cultural
Resources
Analyst
9.8.2022 Compliance with Assembly Bill (AB) 52
and Senate Bill (SB) 18 regarding the
requirements of tribal consultation as
a result of an EIR and NOP. Author
provides examples of appropriate
mitigation measures if applicable. The
author provides recommendations for
cultural resource assessments and the
necessary steps to follow in order to
fully determine the existence and
significance of tribal cultural resources
on or near the project site.
Section 3.5,
Cultural
Resources and
Tribal Cultural
Resources
San Joaquin Valley
Air Pollution
Control District
Brian
Clements,
Director of
Permit
Services
9.30.2022 The commenter provides comments
related to criteria air pollutant
emissions, construction emissions,
operational emissions, recommended
using the California Emissions
Estimator Model (CalEEMod), Truck
Routing, cleanest available trucks,
reduce idling of heavy-duty trucks, use
of on-site electric road equipment,
voluntary emission reduction
agreement, health risk assessment, a
health impact discussion, ambient air
quality analysis, and cumulative air
impacts.
Section 3.3, Air
Quality, and
Section 3.8,
Greenhouse Gas
Emissions
California
Department of Fish
and Wildlife
Julie Vance,
Regional
Manager
10.17.2022 The commenter provides comments
related to Swainson’s hawk (Buteo
swainsoni), the Crotch’s bumblebee
(Bombus crotchii), and the northern
legless lizard (Anniella pulchra). The
commenter recommends a qualified
Biologist conduct a habitat assessment
as part of the biological technical
study.
Section 3.4,
Biological
Resources
Source: FirstCarbon Solutions (FCS). 2023.
City of Visalia—Shirk and Riggin Industrial Project
Introduction Draft EIR
1-4
1.2.1 - Environmental Issues Determined not to be Significant The NOP identified topical areas that were determined not to be significant. An explanation of why each area is determined not to be significant is provided in Chapter 4, Effects Found not to be Significant. These topical areas are as follows:
• Mineral Resources
• Population and Housing
• Parks and Recreation
1.2.2 - Potentially Significant Environmental Issues
The NOP found that the following topical areas may contain potentially significant environmental issues that will require further analysis in the Draft EIR. These sections are as follows:
• Aesthetics
• Agriculture and Forestry Resources
• Air Quality
• Biological Resources
• Cultural Resources and Tribal Cultural Resources
• Energy
• Geology and Soils
• Greenhouse Gas Emissions
• Hazards and Hazardous Materials
• Hydrology and Water Quality
• Land Use and Planning
• Noise
• Public Services
• Transportation
• Utilities and Service Systems
• Wildfire
1.3 - Organization of the Draft EIR
This Draft EIR is organized into the following main sections:
• Chapter ES: Executive Summary. This chapter includes a summary of the proposed project and alternatives to be addressed in the Draft EIR. A brief description of the areas of controversy and issues to be resolved, and overview of the Mitigation Monitoring and Reporting Program (MMRP), in addition to a table that summarizes the impacts, mitigation measures, and level of significance after mitigation, are also included in this section. • Chapter 1: Introduction. This chapter provides an introduction and overview describing the purpose of this Draft EIR, its scope and components, and its review and certification process.
City of Visalia—Shirk and Riggin Industrial Project
Draft EIR Introduction
1-5
• Chapter 2: Project Description. This chapter includes a detailed description of the proposed project, including its location, site, and project characteristics. A discussion of the project objectives, intended uses of the Draft EIR, responsible agencies, and approvals that are needed for the proposed project is also provided.
• Chapter 3: Environmental Impact Analysis. This chapter analyzes the environmental impacts of the proposed project. Impacts are organized into major topic areas. Each topic area includes a description of the environmental setting, methodology, significance criteria, impacts, mitigation measures, and significance after mitigation. The specific environmental topics that are addressed within Chapter 3 are as follows:
Section 3.1—Aesthetics, Light, and Glare: Addresses the potential visual impacts of development intensification and the overall increase in illumination produced by the proposed project.
Section 3.2—Agriculture and Forestry Resources: Addresses the potential for conversion of Important Farmland to nonagricultural use and forest land to non-forest use.
Section 3.3—Air Quality: Addresses potential air quality impacts associated with project implementation and emissions of criteria pollutants. The section also evaluates project emissions of toxic air contaminants.
Section 3.4—Biological Resources: Addresses potential impacts on special-status habitat, vegetation, and wildlife; potential degradation or elimination of important habitat for special-status species; and impacts on listed, proposed, and candidate threatened and endangered species.
Section 3.5—Cultural Resources and Tribal Cultural Resources: Addresses potential impacts on historical resources, archaeological resources, burial sites, and tribal cultural resources.
Section 3.6—Energy: Addresses potential project impacts related to energy usage.
Section 3.7—Geology and Soils: Addresses potential impacts related to soils and assesses effects of project-related development in relation to geologic and seismic conditions. Also addresses potential impacts related to paleontological or unique geologic resources.
Section 3.8—Greenhouse Gas Emissions: Addresses potential project emissions of greenhouse gases.
Section 3.9—Hazards and Hazardous Materials: Addresses potential for presence of hazardous materials or conditions on the project site and in the project area that may have potential to create a significant hazard to the public or the environment.
Section 3.10—Hydrology and Water Quality: Addresses potential impacts related to local hydrological conditions, including drainage areas and changes in flow rates, as well as the proposed project’s potential impacts to water quality, erosion, and groundwater supplies.
Section 3.11—Land Use and Planning: Addresses the potential land use impacts associated with division of an established community and consistency with relevant land use plans, policies and regulations adopted for the purpose of avoiding or mitigating an environmental impact.
Section 3.12—Noise: Addresses potential noise impacts during construction and at project buildout from mobile and stationary sources on sensitive receptors. The section also addresses potential impact related to groundborne vibration and groundborne noise.
City of Visalia—Shirk and Riggin Industrial Project
Introduction Draft EIR
1-6
Section 3.13—Public Services: Addresses potential impacts of the proposed project upon public services, including fire protection, law enforcement, schools, parks, recreational facilities, and library facilities in terms of the need to provide new or physical alter facilities in order to maintain acceptable service ratios, response times, or other performance objectives.
Section 3.14—Transportation and Traffic: Addresses potential impacts related to the local and regional roadway system with respect to Vehicle Miles Traveled (VMT) and public transportation, bicycle, and pedestrian access. Also includes a non-CEQA operational analysis for informational purposes.
Section 3.15—Utilities and Services Systems: Addresses potential impacts related to service providers, including water supply, stormwater, wastewater, solid waste, and energy (electric and natural gas) providers and telecommunications, with respect to the proposed project’s potential to require or result in the construction of new or expanded infrastructure.
Section 3-16—Wildfire: Addresses potential impacts related to wildfire including lands within State Responsibility Areas and lands classified as very high fire hazard severity zones. • Chapter 4: Effects Found not to be Significant. This chapter contains analysis of the topical sections not addressed in Chapter 3.
• Chapter 5: Other CEQA Considerations. This chapter provides a summary of significant environmental impacts, including unavoidable and growth-inducing impacts, as well as significant irreversible environmental changes.
• Chapter 6: Alternatives to the Proposed Project. This chapter compares the impacts of the proposed project with three land-use project alternatives: the No Project Alternative, Reduced Footprint Alternative, and the Alternative Location. An environmentally superior alternative is identified. In addition, alternatives initially considered but rejected from further consideration are discussed.
• Chapter 7: Persons and Organizations Consulted/List of Preparers. This chapter also contains a full list of persons and organizations that were consulted during the preparation of this Draft EIR. This chapter also contains a full list of the authors who assisted in the preparation of the Draft EIR, by name and affiliation.
• Appendices. The Draft EIR appendices include notices and other procedural documents pertinent to the Draft EIR, as well as supporting technical materials. The following supporting materials and technical studies and analyses were prepared for the proposed project in support of preparation of this Draft EIR:
Appendix A: EIR Public Involvement (NOP , EIR Public Scoping Comments) Appendix B: Air Quality, Greenhouse Gas, and Energy Supporting Information Appendix C: Biological Resources Supporting Information Appendix D: Cultural and Tribal Cultural Resources Supporting Information Appendix E: Geology and Soils Supporting Information
Appendix F: Hazards and Hazardous Materials Supporting Information Appendix G: Agricultural Resources and Forestry Supporting Information Appendix H: Noise Supporting Information
Appendix I: Transportation Supporting Information
City of Visalia—Shirk and Riggin Industrial Project
Draft EIR Introduction
1-7
Appendix J: Water Supply Assessment
Appendix K: Aesthetics
1.4 - Documents Incorporated by Reference
As permitted by CEQA Guidelines Section 15150, this Draft EIR has referenced several technical studies, analyses, and previously certified environmental documentation. Information from the documents, which have been incorporated by reference, has been briefly summarized in the appropriate section(s). The relationship between the incorporated part of the referenced document and the Draft EIR has also been described. The documents and other sources that have been used in the preparation of this Draft EIR include but are not limited to:
• Visalia General Plan Update. Dyett & Bhatia, October 2014. • Visalia City Council Resolution No. 2014-38 (Certifying the Visalia General Plan Update), passed and adopted October 14, 2014.
• Visalia General Plan Update Final Environmental Impact Report (SCH No. 2010041078). Dyett & Bhatia, June 2014.
• Visalia General Plan Update Draft Environmental Impact Report (SCH No. 2010041078). Dyett & Bhatia, March 2014.
• Visalia City Council Resolution No. 2014-37 (Certifying the EIR for the Visalia General Plan Update), passed and adopted October 14, 2014.
• Visalia Municipal Code, including Title 17 (Zoning Ordinance). • CEQA Guidelines.
• City of Visalia, California, Climate Action Plan, Draft Final. Strategic Energy Innovations, December 2013.
• Visalia City Council Resolution No. 2014-36 (Certifying the Visalia Climate Action Plan), passed and adopted October 14, 2014.
• City of Visalia Storm Water Master Plan. Boyle Engineering Corporation, September 1994. • City of Visalia Sanitary Sewer Master Plan. City of Visalia, 1994. • 2020 Urban Water Management Plan, Visalia District. California Water Service Company, June 2021.
• City of Visalia Zoning Ordinance Update. City of Visalia, March 2017.
The City of Visalia General Plan, City of Visalia General Plan EIR, City of Visalia Zoning Code, and the referenced documents and other sources used in preparation of the EIR can be viewed here:
https://www.visalia.city/depts/community_development/planning/gp.asp. The above-referenced documents and other sources used in the preparation of the Draft EIR will also be available to the public for inspection at the addresses shown in Section 1.5 in accordance with CEQA Guidelines Section 15150(b).
City of Visalia—Shirk and Riggin Industrial Project
Introduction Draft EIR
1-8
1.5 - Review of the Draft EIR
Upon completion of the Draft EIR, the City filed a Notice of Completion (NOC) with the State Office of Planning and Research to begin the public review period (PRC § 21161). Concurrent with the NOC, this Draft EIR has been distributed to responsible and trustee agencies, other affected agencies, surrounding cities, and interested parties, as well as all parties requesting a copy of the Draft EIR in accordance with Public Resources Code 21092(b)(3). During the public review period, the Draft EIR, including the technical appendices, is available for review at the City’s Planning Department. The address is provided below:
Visalia City Hall
315 East Acequia Avenue
Visalia, CA 93291
The Draft EIR is also available for review at the following website:
https://www.visalia.city/depts/community_development/planning/ceqa_environmental_review.asp.
Agencies, organizations, and interested parties have the opportunity to comment on the Draft EIR during the 45-day public review period. Written comments on this Draft EIR should be addressed to:
Brandon Smith, Principal Planner
City of Visalia
315 E. Acequia Avenue
Visalia, CA 93291
559.713.4636
[email protected]
Submittal of electronic comments in Microsoft Word or Adobe PDF format is encouraged. Upon completion of the 45-day public review period, written responses to all significant environmental issues raised will be prepared and made available for review by the commenting agencies, organizations and public at least 10 days prior to the public hearing before the Visalia City Council on the proposed project, at which the certification of the Final EIR will be considered prior to the Council taking action on the proposed project. Comments received and the responses to comments will be included as part of the record for consideration by decision-makers for the proposed project.
City of Visalia—Shirk and Riggin Industrial Project
Draft EIR Project Description
2-1
CHAPTER 2: PROJECT DESCRIPTION
This Draft Environmental Impact Report (Draft EIR) is prepared in accordance and in compliance with the applicable criteria, standards, and procedures of the California Environmental Quality Act (CEQA), as amended (California Public Resources Code [PRC], § 21000, et seq.) and the CEQA Guidelines (California Code of Regulations [CCR], Title 14, § 15000, et seq.) (collectively, CEQA). This Draft EIR analyzes the potential environmental effects of the proposed Shirk and Riggin Industrial Project (proposed project), located in unincorporated Tulare County (County), adjacent to the City of Visalia (City). This section includes all contents required by CEQA Guidelines Section 15124 including a detailed project site map as well as regional map, a statement of project objectives, a description of the project’s technical, economic, and environmental characteristics, a list of responsible and trustee agencies, a list of approvals and permits required to implement the proposed project, and a summary of review and consultation requirements.
2.1 - Overview
Seefried Industrial Properties, Inc. (applicant) is proposing to develop a mixed-use industrial park and related improvements and infrastructure (proposed project) on an approximately 284-acre site that is currently within unincorporated Tulare County, adjacent to the northern municipal boundary of the City of Visalia, California.
2.2 - Project Location and Setting
2.2.1 - Regional Setting
The City of Visalia, located in the Central Valley, covers an area of approximately 36 square miles (Exhibit 2-1).1 The City is situated in northwestern Tulare County, north of the City of Tulare and west of the City of Farmersville. The City of Hanford, in Kings County, lies 12 miles to the west. Most of the remaining land uses surrounding the City are agricultural in nature. Major roadway networks include Highway 198, which passes east–west through the center of the City; Highway 99, which runs north– south along the western edge of the City; and Highway 63, which passes north–south through the center of the City.
2.2.2 - Local Setting
The project site is generally bound by Riggin Avenue to the south, Shirk Street to the east, Kelsey Street to the west, and Modoc Ditch to the north (Exhibit 2-2). A private road intersects the project site from south to north. The project site consists of three existing parcels: APNs 077-840-004, 077-840-005, and 077-840-006 (formerly APNs 077-840-001, 077-840-002, and 077-840-003). 2 The project site is
1 City of Visalia. 2014. General Plan Environmental Impact Report (EIR). Website:
https://www.visalia.city/civicax/filebank/blobdload.aspx?BlobID=30490. Accessed August 17, 2022. 2 The combined area of the three APNs is 279.73, rounded to 280; the project site area referred to in this Draft EIR is 284.58, rounded to 284, and includes the 4.72 acres of street dedication along the eastern and western project site boundaries. The difference between 279.56 (284.58 acres minus 4.72 acres of street dedication) and 279.73 can be attributed to multiple-digit rounding.
City of Visalia—Shirk and Riggin Industrial Project
Project Description Draft EIR
2-2
within the City’s Planning Area,3 Urban Development Boundary (UDB) Tier 1 of the City (Exhibit 2-3), and the City’s Sphere of Influence (SOI).
2.3 - Environmental Setting
2.3.1 - Historical and Existing Uses
Agricultural uses have existed on the project site since 1937, and several structures previously existed in the central, northern, and southeastern portions of the site to support these agricultural uses. Several of the structures in the northern and southeastern portion were demolished by 1969, and the central portion of the site was graded. The graded land in the central portion of the site was redeveloped for agricultural use by 1984. The remaining structures were demolished, and the project site was developed in its current configuration by 1984. The project site currently consists of an actively managed almond orchard, established around 2018. A pump house and small structures are adjacent to the detention basin.
2.3.2 - Site Characteristics
Currently, all orchard areas on the project site are actively managed, with sparse herbaceous understory plant cover that consists of managed ruderal non-native grasses and forbs. In addition to the orchard, there are non-native planted ornamental trees, including a double row of 35 olive trees and a cluster of two tall elm trees, and one cedar along a private road that runs south to north along the project site.
Although not rooted within the project site, a substantial portion of the canopy of a mature valley oak overlaps onto the project site on the northern boundary. The oak tree is rooted on the neighboring property, at the northern bank of Modoc Ditch. The project site provides suitable foraging habitat with potential to support birds of prey, including Swainson’s hawk.
Modoc Ditch is a man-made, actively managed irrigation canal aligned along the northern boundary of the project site. It is approximately 15 feet wide and carried approximately a foot of water at the time of the survey; water levels are expected to fluctuate based on agricultural activity. Flows of the canal are sustained by water that is pumped in through the regional irrigation infrastructure, and the flows are typically disconnected from St. John’s River to the east but can likely be connected to St.
John’s River under flooding conditions.
The project site contains a man-made and actively managed detention basin for irrigation purposes, located at the northern portion of the site. Water levels likely fluctuate depending on agriculture activities and needs. Water is actively pumped into the detention basin from Modoc Ditch. The detention basin was constructed during establishment of the almond orchard in 2018.
In addition, there are access roads that traverse the project site, which are currently dirt with small amounts of managed, non-native invasive grasses and forbs on edges.
3 Planning area refers to the land area addressed by a General Plan, including land within the city limits and land outside the city limits that bears a relation to the City’s planning. This area is not all intended for development; the Urban Growth Boundary shows the future development area.
City of Visalia—Shirk and Riggin Industrial Project
Draft EIR Project Description
2-3
See Exhibit 2-4 for an aerial image depicting the on-site features discussed above, and Exhibit 2-5a and Exhibit 2-5b for site photos.
The project site is gently sloping toward the east with a ground surface elevation of approximately 300 to 305 feet above mean sea level. The entire project site is considered Prime Farmland as mapped by the California Department of Conservation Farmland Mapping and Monitoring Program.
Prime Farmland is land which has the best combination of physical and chemical characteristics for the production of crops. It has the soil quality, growing season, and moisture supply needed to produce sustained high yields of crops when treated and managed, including water management, according to current farming methods.4 The project site is encumbered by a Williamson Act contract.
The landowner submitted a Notice of Non-renewal application to Tulare County in July 2021, beginning a nine-year process to formally expire the contract. Based on the date of the Notice of Non-renewal, the contract would have expired on December 31, 2030. However, given the anticipated timing to commence construction of the proposed project, rather than waiting for the contract to expire automatically by operation of law pursuant to the Notice of Non-renewal, the landowner moved forward with cancellation proceedings under State law. To that end, the landowner obtained approval, subject to compliance with certain conditions, from the Board of Supervisors of Tulare County to remove 280 acres from the subject County Agricultural Preserve No. 0293 and to tentatively cancel the contract (WAC No. 2880) pursuant to Government Code Sections 51281 and 51282 on November 29, 2022 (see Tulare County Board of Supervisors Resolution No. 2022-1005, attached as Appendix G2). The Final Certificate of Cancellation will be executed and recorded upon satisfaction of the conditions enumerated in the Certificate of Partial Tentative Cancellation of Land Conservation Contract (recorded as Document No. 2022-0073141 on December 1, 2022) (attached as Appendix G2).”
Most of the project site is located within Zone X: 0.2 Percent Annual Chance Flood Hazard, and the southeast corner of the site is located within Zone X: Minimal Flood Hazard. 5 2.3.3 - Existing Land Use and Zoning Designations
County of Tulare
The County has adopted various City Plans for all eight incorporated cities in the County to guide County land use decisions outside of city limits but within the County’s Urban Development Boundaries and Urban Area Boundaries surrounding each City. The project site is within the General Plan’s “County Adopted City Plan” for Visalia.
The project site is zoned AE-40 on the County’s Zoning Map. The AE-40 Zone is intended for intensive and extensive agricultural uses and for those uses which are a necessary and integral part of intensive and extensive agricultural operations.
Exhibit 2-6 depicts the County’s zoning designation for the project site.
4 Department of Conservation. Important Farmland Mapping Categories and Soil Taxonomy Terms. Website:
https://www.conservation.ca.gov/dlrp/fmmp/Documents/soil_criteria.pdf. Accessed August 18, 2022. 5 Federal Emergency Management Agency (FEMA). 2022. National Flood Hazard Layer FIRMette. August 18. Website:
https://msc.fema.gov/portal/search?AddressQuery=8029%20W%20Riggin%20Ave%2C%20Visalia%2C%20CA%2093291#searchresul tsanchor. Accessed August 18, 2022.
City of Visalia—Shirk and Riggin Industrial Project
Project Description Draft EIR
2-4
City of Visalia
The project site has City of Visalia General Plan (General Plan) land use designations of Industrial and Light Industrial.6
The General Plan Land Use Element presents a framework to guide future land use decisions and development in the City while also enhancing community character and improving the City’s look and feel. The Light Industrial designation is intended for light manufacturing, warehousing, storage, distribution, research and development enterprises, and secondary office (limited customer access) uses. This designation also conditionally permits uses like convenience store and drive-through restaurants. The maximum floor area ratio (FAR) for this designation is 0.5. The Industrial designation allows uses such as primary manufacturing, processing, refining, and similar activities including those with outdoor facilities. It also accommodates warehousing and distribution with supporting commercial services and office space. Retail uses are not permitted. The maximum FAR for this designation is 0.6.
Exhibit 2-7 depicts the City’s General Plan land use designation of the project site. Upon completion of the annexation process to the City, the project site would be zoned Industrial and Light Industrial.
The project site is currently used for agricultural purposes but as noted above, has been planned by the City for light industrial and industrial uses pursuant to the identified General Plan land use designations.
2.3.4 - Surrounding Uses: Land Use and Zoning
The area surrounding the project site has both an agricultural and industrial character. Land uses east and north of the project site (east of Shirk Street and north of Modoc Ditch) consist of agricultural uses. Land uses west of the project site (west of Kelsey Street) consist of the Amazon distribution center and United Parcel Service (UPS) distribution hub. Land uses south of the project site (south of Riggin Avenue) consist of various industrial uses, four trailer homes, and agricultural uses (including a dairy farm). The nearest sensitive receptors are the trailer homes and multi-family residences immediately south and southeast of Riggin Avenue, respectively.
2.4 - Project Objectives
Section 15124 of the State CEQA Guidelines requires an EIR project description to include a description of project objectives. In addition to addressing the underlying project purpose(s), the objectives are relevant to the development of the alternatives considered in the EIR and in the preparation of findings or a statement of overriding considerations, if necessary, in support of the decision-making action by the City.
The fundamental purpose and goal of the proposed project is to accomplish the orderly development of the project site as proposed, consistent with the General Plan’s industrial land use
6 City of Visalia. 2014. General Plan Land Use Element. Website:
https://www.visalia.city/civicax/filebank/blobdload.aspx?BlobID=30474. Accessed August 17, 2022.
City of Visalia—Shirk and Riggin Industrial Project
Draft EIR Project Description
2-5
designation, which would provide economic benefits to the City, among others. The applicant’s objectives of the proposed project consist of the following:
1. Ensure that development of the project site is accomplished in an economically viable manner consistent with applicable goals and policies as set forth in the City’s General Plan, including the land use vision set forth therein that contemplates light industrial and industrial uses, taking into account necessary site plan considerations, including efficient access and loading.
2. Maximize development of the existing underutilized project site and generate increased revenue and economic development for the City in order to support the City’s ongoing City operations.
3. Develop a mixed-use industrial park, with light manufacturing, warehouse, distribution, and/or flex industrial uses, in the City that is designed to meet market demand and contemporary industry standards, including building size and clear height requirements, modern façades, articulated concrete panels, natural color palette, and expansive glass entry features.
4. Create employment-generating businesses in the City to reduce the need for members of the local workforce to commute outside the area for employment and to improve the jobs-to- housing balance.
5. Maximize placement of industrial warehouse uses in close proximity to the State Highway system (State Route [SR] 99) and other major transportation corridors to avoid or shorten truck-trip lengths, as feasible, on other roadways and to avoid locating industrial buildings in close proximity to residential uses or other sensitive receptors.
6. Develop an innovative industrial use providing a wide range of building sizes with cross dock and rear load capability that have ready access to available infrastructure, including major transportation corridors and utilities to be used as part of the Central Valley supply chain and goods movement network.
2.5 - Project Description
2.5.1 - Development Summary
The proposed project would discontinue the existing agricultural uses, demolish remaining on-site structures that serve agricultural uses, and develop a mixed-use industrial park totaling approximately 3,720,149 square feet of light industrial and flex industrial uses along with car/trailer parking areas and related on- and off-site improvements (Exhibit 2-8 and Exhibit 2-9). Parking and loading areas to serve the industrial uses would be provided around the project site pursuant to the City’s applicable parking and loading standards. The proposed project would include eight stormwater detention basins that would surround the parking/loading areas. Access would be provided via three access points along Shirk Street, three access points along Riggin Avenue, and three access points along Kelsey Street. Clancy Street south of the project site would be extended to replace the existing private road and would traverse south to north of the site. There would also be other compatible non-industrial uses, consisting of self-storage/RV parking, a convenience store, a City of Visalia—Shirk and Riggin Industrial Project
Project Description Draft EIR
2-6
car wash, a gas station, and two drive-through restaurants. The proposed buildings would comply with the development standards for industrial districts set forth in Visalia Municipal Code Chapter
17.22, Industrial Zones, related to, but not limited to minimum lot area and width, setbacks, distance between buildings, FAR, maximum building height and landscape area.
The industrial park would involve both flex industrial and light industrial uses. Flex industrial uses would consist of small incubator space available for small manufacturing, storage, limited warehouse space, while the light industrial uses would consist of warehouse, distribution, storage, and light manufacturing. The proposed project would include the following buildings:
Table 2-1: Development Summary
Building Square Footage
Light Industrial Building No. 1 +/- 786,240 square feet Light Industrial Building No. 2 +/- 1,078,440 square feet Light Industrial Building No. 3 +/- 144,300 square feet Light Industrial Building No. 4 +/- 173,160 square feet Light Industrial Building No. 5 +/- 156,140 square feet Light Industrial Building No. 6 +/- 109,890 square feet Light Industrial Building No. 7 +/- 513,240 square feet Light Industrial Building No. 8 +/- 513,240 square feet Flex Industrial Buildings +/- 84,480 square feet
Self-Storage/Recreation Vehicle (RV)
Buildings
+/- 144,800 square feet
Convenience Store and Gas Station +/- 6,922 square feet Drive-through Restaurant No. 1 +/- 2,368 square feet
Drive-through Restaurant No. 2 +/- 2,368 square feet
Car Wash +/- 4,560 square feet
Water Quality Management Basins +/- 31.3 acres
Landscaping +/- 30.68 acres
Operation
The proposed project would have a total of approximately 4,177 employees at buildout.7 The proposed industrial and flex industrial buildings are assumed to operate 24 hours a day, 7 days a week and typically consist of both day and night shifts. The proposed RV and self-storage, car wash, drive through restaurants, and convenience store would have operation hours that adhere to any
7 Consistent with the project traffic study, the employee amount at buildout is based on the conversion of ITE trip generation for building size and employee.
City of Visalia—Shirk and Riggin Industrial Project
Draft EIR Project Description
2-7
requirements set forth in the City’s zoning ordinance and conditional use permit, and otherwise consistent with industry standard practice.
Building and Design
As shown in Exhibit 2-10a and Exhibit 2-10b, the industrial buildings would have light gray walls with white, gray, and blue accents and gray and white aluminum composite metal panels. Minimally reflective materials, such as dark bronze colored glass, would be used for the windows. Design and height of the flex industrial, car wash, drive-through restaurants, and convenience store would be consistent with applicable City design standards. The proposed project is designed to meet contemporary industry standards including modern façades, articulated concrete panels, natural color palette, and expansive glass entry features. Project design features would reduce energy usage and water usage including native plants and vegetation for landscaped areas to reduce water use, low-water-usage plumbing fixtures, clerestory windows, recycling collection and storage areas inside each building for all types of recyclables, and low-emitting finish materials. The proposed industrial buildings would have a maximum height of 45 feet. The final design would be submitted as part of the design review submittal to the City to ensure a desirable environment for its occupants, visiting public, and its neighbors through the appropriate use of materials, texture, and color, and would remain aesthetically appealing and be appropriately maintained.
Vehicle Access and Circulation
Regional access to the project site is available from SR-99 via the Betty Drive interchange. Access would be provided via three access points along Shirk Street, three access points along Riggin Avenue, and five access points along Kelsey Street. Clancy Street south of the project site would be extended to replace the existing private road and would traverse south to north of the site. An internal network of driveways and drive aisles would connect the overall project. A series of pedestrian sidewalks would be provided throughout the project site.
The applicant would dedicate easements along the east side of Kelsey Street, west side of Shirk Street, and Clancy Street to the City after construction of the road improvements to be completed as part of the project, consisting of sidewalk improvements, curb and gutter, and signing and striping (Exhibit 2-11).
Parking
Parking would be provided pursuant to applicable parking requirements of Visalia Municipal Code Section 17.34.020. Manufacturing plants and other industrial uses are required to have one parking space for each employee during shift of maximum employment, plus one parking space per vehicle used in conjunction with the use.8 Restaurants are required to have one parking space per 150 square feet of building area, and convenience stores are required to have one parking space per 500 square feet of building area. Parking for self-storage facilities is not defined in City code. It is generally accepted that parking will be provided for any on-site manager and as needed based on the project concept. Table 2-2 below summarizes the required parking calculations.
8 City of Visalia. 2022. Municipal Code Section 17.34.020 Schedule of Off-Street Parking Space Requirements. Website:
https://codelibrary.amlegal.com/codes/visalia/latest/visalia_ca/0-0-0-35278. Accessed August 23, 2022.
City of Visalia—Shirk and Riggin Industrial Project
Project Description Draft EIR
2-8
Page PK-5 of the City of Visalia Engineering Design and Improvement Standards provides the requirements for the minimum number of accessible stalls required based on the total number of stalls proposed.9 For projects proposing greater than 1,001 parking stalls, the minimum number of disabled accessible parking spaces is 20 plus one for each 100 or fraction thereof over 1,000.
Therefore, the proposed project would require approximately 47 accessible parking spaces based on the proposed 3,750 total spaces. Page PK-3 of the City of Visalia Engineering Design and Improvement Standards states that one in every six accessible parking stalls shall be van accessible.
Therefore, of the 47 accessible spaces, at least eight must be van accessible.
Table 2-2: Required and Proposed Parking
Land Use
Building
Area
(SF)
(approx.)
Parking Requirements
Parking Required
(Number of Spaces)
(approx.)
Parking Proposed
(Number of Spaces)
(approx.)
Spaces/
Employees
(approx.)
Spaces/
Building Area
(approx.)
Flex
Industrial
84,480 800 – 244 269
Light
Industrial
3,474,650 1 space/
employee
during shift
of maximum
employment,
plus one
parking
space per
vehicle used
in
conjunction
with the use
– 2,316 employee parking 3,331
Self-Storage 144,800 – – – 35
C-Store 6,922 – 1 space/
500 SF
14 24
Drive-
through
Restaurants
4,736 – 1 space/
150 SF
32 74
Car Wash 4,560 – 1 space/
500 SF
9 17
Total 3,720,149 – – Standard ADA Total Standard ADA Total 2,579 36 2,616 3,750 47 3,750
Notes:
SF = square feet
ADA = Americans with Disabilities Act
9 City of Visalia. 2016. Parking Standards. September. Website:
https://www.visalia.city/civicax/filebank/blobdload.aspx?BlobID=34593. Accessed August 23, 2022.
City of Visalia—Shirk and Riggin Industrial Project
Draft EIR Project Description
2-9
Landscaping
Landscaping would be provided in accordance with the City’s Landscape Standard Specifications.10 The proposed project contains approximately 31.3 acres of water quality management basins to retain stormwater on-site. The detention basins would be planted with species including the Berkeley sedge, Canyon Prince wild rye, Hummingbird sage, and California goldenrod.
Outside of the building footprints, roads, parking lots, and stormwater basins, approximately 30.68 acres remain for landscaping within the project boundary. Trees to be used for parking area landscaping would include species with very low to medium water needs, including but not limited to coast live oak, autumn gold ginkgo, London plane tree, zelkova, Arizona cypress, and southern magnolia. Shrubs and groundcovers would feature species with low water needs, such as buffalo grass, Bermuda grass, feather reed grass, blue fescue, pink muhly grasses, and heavenly bamboo.
Lighting
Exterior lighting is designed to maximize employee safety and security while complying with applicable Visalia Municipal Code standards, the CALGreen Code, and the Title 24 Energy Efficiency Standards, as applicable. New sources of light that would be located on-site and primarily include parking lot pole-mounted lights, and building-mounted outdoor security lighting. The lighting would be directed away from adjoining properties and the public right-of-way. Exhibit 2-12 depicts the photometric plan for the project; the proposed lighting would be confined within developed areas of the site and a small portion of Riggin Avenue.
2.5.2 - Utilities
The proposed project would require connection to various City-operated utility and infrastructure systems. These include City-provided services such as water, wastewater, and stormwater facilities.
Non-City provided infrastructure includes natural gas (to be provided by Southern California Gas Company) and electrical services (to be provided by Southern California Edison [SCE]). The proposed project would be responsible for construction of the necessary connection points to the City’s existing infrastructure. Proposed infrastructure improvements for water, sewer, and stormwater facilities are described below. The proposed project would remove or modify the existing detention basin and would potentially require two new culvert crossings over Modoc Ditch and extension of one existing culvert crossing.
Water Demand and Supply
Potable water is anticipated to be supplied to the proposed project by California Water Service (Cal Water), which is a wholesale provider to the City. Service laterals would be extended from an existing water line located within Kelsey Street. As shown in Exhibit 2-13, the proposed project would be served by a series of new 8-inch and 12-inch water lines throughout the project site.
It is estimated that the proposed project would have an average potable usage of approximately 124.1 acre-feet per year at project buildout.11
10 City of Visalia. 2013. Landscape Standard Specifications. August 5. Website:
https://www.visalia.city/civicax/filebank/blobdload.aspx?BlobID=15472. Accessed August 23, 2022. 11 4Creeks, Inc. 2022. Water Supply Technical Memorandum Shirk and Riggin Industrial Park. September.
City of Visalia—Shirk and Riggin Industrial Project
Project Description Draft EIR
2-10
As discussed in the Cal Water Visalia District 2020 Urban Water Management Plan, future water demands are expected to be comprised only of potable water use. The City of Visalia has entered into agreements with Tulare Irrigation District to supply recycled water from its wastewater treatment facilities for groundwater recharge uses. None of the recycled water supplied to Tulare Irrigation District is expected to be used to meet the future water demands of District customers.
Wastewater
Wastewater generated by the proposed project would be treated by the City’s Water Conservation Plant. The proposed project would install and extend all City master planned sewer lines to the extent determined by the City Engineer pursuant to the applicant’s development phasing plans and in accordance with legal nexus requirements. Service laterals would be extended from an existing sewer line located within Riggin Avenue and Kelsey Street. As shown in Exhibit 2-14, the proposed project would be served by a series of new 8-inch and 12-inch sewer lines throughout the project site.
Storm Drainage
The proposed project would install an on-site storm drainage system consisting of inlets, underground piping, and basins. Approximately 31.3 acres of water quality management basins would be installed. Runoff would drain to drainage system located throughout the project site (Exhibit 2-15). The system would be designed to meet all applicable standards and requirements including accommodating a 100-year storm event and detaining runoff and release it at a rate no greater than the pre-development condition of the project site. The proposed project would be required to retain the stormwater per the City’s drainage requirements and all other applicable standards.
2.5.3 - Phasing and Construction
For the purposes of the environmental analysis in this EIR and in accordance with the applicant’s project development goals, construction of the proposed project is anticipated to begin in March 2024 and completed in March 2028, with operations commencing upon the completion of construction of the proposed project.12
As described above, given its size and nature, it is reasonable to assume the proposed project would be constructed in phases over time. However, because various market, economic and other considerations would ultimately determine how construction phasing would occur in connection with individual specific development proposal(s), this Draft EIR utilizes the following assumptions based on reasonably available information for purposes of a conservative analysis. As shown in Exhibit 2-16, “Phase 1” of project construction is defined herein to consist of approximately 1,864,700 square feet of light industrial space, occurring generally in the locations shown on Exhibit 2-16. Construction of Phase 1 is assumed to begin in March 2024 and end in March 2025. “Phase 2” of project construction is defined herein to consist of approximately 830,700 square feet of light industrial space as well as the car wash, the convenience store with gasoline pumps, and
12 Because vehicle fuel use becomes more efficient through time in compliance with applicable federal and State laws and regulations, these dates support a conservative evaluation of potential impacts. If the actual dates of construction are delayed, associated effects would be reduced accordingly.
City of Visalia—Shirk and Riggin Industrial Project
Draft EIR Project Description
2-11
both drive-through, quick serve/fast food restaurants. Construction of Phase 2 is assumed to begin in September 2025 and end in September 2026.
“Phase 3” of project construction is defined herein to consist of the remaining approximately 779,270 square feet of light industrial space as well as approximately 84,480 square feet of flex industrial space and the self-storage facility. Construction of Phase 3 is assumed to begin in March 2027 and end in March 2028.
The necessary landscaped areas, parking areas, and the water quality management basins would be included in each of the three Phases, in amounts sufficient to serve each relevant Phase.
While the above-described preliminary construction schedule for the proposed project assumes that Phases 1 through 3 would be built sequentially (i.e., none of the three Phases would overlap), the potential remains for project Phases to be constructed concurrently. Therefore, for the purpose of analyzing the reasonable worst-case scenario and fully disclosing all potential impacts, this Draft EIR also evaluates impacts that could occur if there were concurrent (rather than sequential) phasing for the proposed project, as detailed more fully in Section 3.3, Air Quality, Section 3.8, Greenhouse Gas Emissions, Section 3.12 Noise, and Section 3.14 Transportation. Accordingly, impact discussions and mitigation measures related to each construction Phase would be applicable to an individual specific development proposal taking place within the development area covered by the relevant Phase.
Construction equipment to be used for the proposed project includes, but is not limited to air compressors, concrete industrial saws, cranes, excavators, forklifts, generator sets, graders, pavers, paving equipment, rollers, rubber-tired bulldozers, tractors, loaders, backhoes, and welders.
Construction hours would be in accordance with City of Visalia Municipal Code Section 8.36.050(C), which prohibits operation of construction equipment between the weekday hours of 7:00 p.m. and 6:00 a.m. and between the weekend hours of 7:00 p.m. and 9:00 a.m.
Cut and Fill
The proposed project includes approximately 130,000 cubic yards of material to be cut, approximately 260,000 cubic yards of fill material, and a net import of approximately 130,000 cubic yards of new material.
2.6 - Required Actions and Approvals
The proposed project would require the certification of the EIR and the following discretionary approvals from the City:
• Approval of a Development Agreement
• Approval of Resolution Initiating Annexation Proceedings • Approval of the Site Plan
• Approval of Tentative Parcel Map
• Conditional Use Permit for the conditionally permitted uses proposed (convenience store, drive-through restaurants), some of the proposed lot sizes in the light industrial zoning, and lots without public street frontage.
City of Visalia—Shirk and Riggin Industrial Project
Project Description Draft EIR
2-12
In addition to the above discretionary approvals from the City, the proposed project would also require approvals of various ministerial permits including a parcel map, demolition permit(s), grading permit(s), building permit(s), certificate(s) of occupancy, right-of-way dedications, and encroachment permit(s).
Other Public Agencies Approval and Consultation
The proposed project would require various permits, approvals and/or entitlements from other public agencies that have jurisdiction over aspects of the proposed project. These may include, but not be limited to the following:
• Tulare County Local Agency Formation Commission (LAFCo) • Tulare County Board of Supervisors
• San Joaquin Valley Air Pollution Control District (Valley Air District) • Regional Water Quality Control Board (RWQCB)
• United States Fish and Wildlife Service (USFWS)
• California Department of Fish and Wildlife (CDFW)
• United States Army Corps of Engineers (USACE)
• California Department of Transportation (Caltrans)
!
·|}þ201
·|}þ137
·|}þ198
KingsCounty
Tulare
County
Fresno County
Tulare County
·|}þ99
·|}þ63
·|}þ43
Farmersville
Exeter
Sanger
Reedley
Selma
Dinuba
VisaliaHanford
Tulare
Corcoran
Orosi
Elderwood
Auckland
Orange Cove
Traver
Sequoia
Goshen
Fowler