Cities Index.
Attachment 4b_Self-Help email

Visalia City Council
April 21, 2025

Document
Attachment 4b_Self-Help email
Meeting
April 21, 2025
Body
Visalia City Council
Original file
1.0 MB
Text extracted from the city's file for reading and search. Open the original on visalia.legistar1.com. That file is the official record.

1 Brandon Smith
From: David Becerra <[email protected]>
Sent: Monday, March 31, 2025 12:29 PM
To: Brandon Smith
Cc: Betsy McGovern-Garcia; Tom Collishaw; Heather Mendonca; Rick Gonzales Subject: Visalia Housing Design Review
Brandon,
As a non-profit affordable housing developer, our financial viability depends on using standardized master plans to streamline approvals, reduce architectural costs, and maintain cost-effective construction. The proposed Objective Design Standards under Chapter 17.12 introduce numerous design mandates that are incompatible with our current plans, as indicated in redline comments such as “plans do not comply.” These requirements would force costly redesigns, threaten compliance with existing funding sources, and hinder the rapid deployment of affordable housing.

Below is a section-by-section breakdown of provisions that will increase costs and where our plans currently do not comply:

17.12.160 – Structure Design Standards
ඝඞ A. Architectural Design Elements (Pages 5–6)
Redline Note: “Structure Design Standards pose a major issue – we only comply with walkway” Requirements: Developments must include at least 3 of 13 design elements on each elevation (front, side, rear). Elements include:
 Projections or recessions
 Second-floor setbacks
 Multiple roof forms or gables
 Juliette balconies
 Decorative trellises
 Bay windows, etc.

Redline Comment: "Plans do not comply" was applied to most of these features.

Cost & Design Impacts:
 Our master plans are intentionally simplified for efficiency. They do not include setbacks, architectural projections, or roofline variations on every elevation.  Adding these features would require:
o Full architectural redesigns
o Additional materials (e.g., gables, eaves, trim)
o Increased framing and labor time
You don't often get email from [email protected]. Learn why this is important 2 This undermines one of our greatest cost-saving tools—plan standardization across multiple lots and communities.

17.12.160.B – Fenestration Requirements
Redline Comment: “Plans do not comply”
Requirement: All windows and doors must include:
 A minimum 2-inch recess, or
 Trim of specific materials (wood, engineered wood, stucco foam) Cost Impact:
 Our windows are currently flush-mounted vinyl in master plans.  Recessing windows or wrapping them in specialty trim adds:
o Framing modifications
o Labor for trimming
o Increased inspection and material costs

17.12.160.C.1 – Materials Limitations
Redline Comment: “Plans do not comply”
Requirement:
 No more than 4 exterior materials per elevation
 Vinyl siding is prohibited
Cost Impact:
 Vinyl siding is one of our most cost-effective and durable cladding options.  Replacing it with approved alternatives (fiber cement, stucco, etc.) increases:
o Material cost by 20–40%
o Labor and insurance (due to materials requiring special handling) o Ongoing maintenance costs for homeowners
This restriction disproportionately affects affordability-focused developments.

Additional “Plans Do Not Comply” Redline Sections
Section Requirement Impact

17.12.160.A.1 Projections every 25 ft Requires design breakups our plans do not include

17.12.160.A.2 Recessions every 25 ft Structural redesign 3 Section Requirement Impact

17.12.160.A.3 Second-floor setbacks Not present in current 2-story plans

17.12.160.A.4 Bay windows Costly and not used in standard plans

17.12.160.A.6 Roof pitch/form changes Additional framing complexity

17.12.160.A.7 Gables/dormers Not included; adds cost

17.12.160.A.9 2nd-story balconies Not feasible within affordability model

17.12.160.A.10 Decorative trellises Unnecessary aesthetic; adds cost

17.12.160.A.11 Window every 15 ft Not met on side/rear elevations of our models ၜၝၞ Conclusion and Request
Our master plans were developed with both cost and speed of delivery in mind, which are critical in addressing the region’s housing crisis. Imposing these standards—most of which our current plans do not comply with—will:
 Result in significant architectural redesigns
 Increase per-unit construction costs beyond affordable thresholds  Delay or halt construction on projects already in the pipeline ܚܛܜRequest:

We respectfully request the City consider:

1. Exempting affordable housing developers using pre-approved master plans from Sections

17.12.160.A–C.

2. Allowing alternative compliance or a waiver process for non-profits operating under fixed public funding programs.

Preserving flexibility in design for projects that already meet all health, safety, and basic zoning standards.

Thanks again for your time.

The Team at Self-Help Enterprises

David Becerra
Sr. Project Manager

Self-Help Enterprises
8445 W. Elowin Court | P.O. Box 6520 Visalia, CA 93290

559-931-2495, Fax: 559-651-3634

[email protected]

www.selfhelpenterprises.org

← All documents from this meeting