Visalia Central Core Sidewalk Survey
Presented by
Engineering Division
Engineering and Building Department
June 16, 2025

PROJECT AREA
E. Murray
Acequia Ave.

Conyer St.

Burke St.

ATTNS: These items are holes in the panel,
and gaps and cracks in between the
sidewalk panels that can be filled in.

OFFSETS: Hazards or lifts on
the panels themselves range in
height from 1/4" to 2“ , can be
repaired by shaving.

SURVEY
R&Rs: Remove and
Replace Concrete.

Examples are heavy
cracks, holes in the
concrete greater than
12" , corners or edges
missing from the slab.

SURVEY AREA
Extended 10 feet from
the center of each
grant-funded tree.

METRICS
OFFSETS: CONCRETE SHAVING WORK (65%)

ATTNS: FILL GAPS AND HOLES (5%)

R&RS: REMOVE, REPLACE & OTHERS (31%)

REPAIR COST
OFFSETS: Concrete Shaving: $199,424
ATTNs: Patching and Caulking: $14,901
TOTAL COST approved with this staff report: $214,325
Remove and Replace Assets: Approximately $1.2 Million
Process to complete R&R work currently being determined by staff.

REPAIRS
Only minor short-term sidewalk
closures required for most
concrete shaving repairs.

BEFORE AFTER