Project Location Exhibit

Visalia City Council
November 3, 2025

Document
Project Location Exhibit
Meeting
November 3, 2025
Body
Visalia City Council
Original file
1.4 MB
Text extracted from the city's file for reading and search. Open the original on visalia.legistar1.com. That file is the official record.

TULARE AVE

IRIS AVE

HOWARD AVE

FEEMSTER AVE

PARADISE AVE

PRINCETON AVE

CAMBRIDGE AVE

VASSAR AVE

WALNUT AVE

CAPE SEAL(SHOWN IN RED)GRINDING & OVERLAY(SHOWN IN BLUE)

SIDEWALK INFILL WITHINSEGMENT OF CAPESEAL (EAST SIDE ONLY) ADDITIONAL - ADA COMPLIANTCURB RAMP DESIGN (TYP.)
EVALUATE EXIST. SIDEWALKWITHIN SEGMENT OF CAPESEAL (EAST SIDE ONLY)

MAIN ST

ACEQUIA AVE

MINERAL KING AVE

NOBLE AVE

KAWEAH AVE

MYRTLE AVE

MT WHITNEYHIGH SCHOOLCONYER ELEMENTARYSCHOOL
HIGHWAY 198
GRINDING & OVERLAY(SHOWN IN BLUE)GRINDING & OVERLAY(SHOWN IN BLUE)ADA COMPLIANT CURBRAMP DESIGN (TYP.)UPGRADE TRAFFIC SIGNALTO VIDEO DETECTION LEGENDCAPE SEAL REHABILITATION (±115,000 SF)GRINDING AND OVERLAY REHABILITATION (±172,200 SF)EVALUATE AND REDESIGN CURB RAMPS, ALLEY APPROACHES AND CITY DRIVEAPPROACHES (5 ALLEY APPROACHES, 3 CITY DRIVE APPROACHES & 26 CURB RAMPS)EVALUATE AND REDESIGN CURB RAMPS - ADDITIONAL ITEM (28 CURB RAMPS)

NORTHNORTH
J:\Proposals\2025\City of Visalia\P25-122 Conyer Street Rehabilitation\Dwg\SOW Exhibit.dwg10/3/2025 2:03 PM All reproduction & intellectual property rights reserved © 2025 Lane Project No:P25-122 LANE ENGINEERS, INC.CIVIL STRUCTURAL SURVEYING979 North Blackstone StreetTulare, California 93274559.688.5263www.laneengineers.comCONYER STREET

SEE LOWER LEFT

SEE UPPER RIGHT

EXHIBIT 'A'SCOPE OF WORK EXHIBIT
SCALE: 1" = 250'