V:\Clients\Kaweah Delta WCD - 1225\12250901-SUR\_DOCUMENTS\Reports\2010-08-10 Creek Pool and Pond Memo.doc

WATER & WASTEWATER

MUNICIPAL INFRASTRUCTURE

LAND DEVELOPMENT

AGRICULTURE SERVICES

DAIRY SERVICES

LAND SURVEYING & GIS

PLANNING & ENVIRONMENTAL

DISTRICT MANAGEMENT

FRESNO • CLOVIS • VISALIA • BAKERSFIELD

2505 Alluvial Avenue
Clovis, CA 93611-9166
(559) 326-1100 • FAX (559) 326-1090
www.ppeng.com

MEMOR AND UM

To: Larry Dotson, PE
From: Richard Moss, PE, Randy Hopkins, PE

Subject: Packwood and Cameron Creeks Pool and Basin Reconnaissance Study Date: August 10, 2010

BACKGROUND
The Kaweah Delta Water Conservation District (KDWCD ) is working with the City of Visalia, CalWater and Tulare Irrigation District to develop a groundwater recharge program in the Visalia region. As part of this eff ort the agencies are considering using Packwood and Cameron creeks to convey water from th e Kaweah or St. Johns rivers (originating from either the Kaweah River or CVP Fr iant-Kern Canal) to one or more basins for groundwater recharge. In-channel check structures could also be used to store water in the creeks to increase recharge.

A hydraulics and capacity analysis was previously p erformed on both Packwood and Cameron creeks along their alignments near and thro ugh the City of Visalia. A HEC- RAS model was developed for each creek to determine anticipated water surface elevations at various flow rates. In conjunction w ith the HEC-RAS models, profiles of each creek were developed to show potential capacit y and freeboard issues at various flow rates.

PURPOSE AND SCOPE
KDWCD and the City of Visalia are considering the u se of these two creeks for groundwater recharge and/or conveying surface water to recharge basins located along the creek alignments. By using existing check stru ctures or constructing new ones at strategic locations along the creeks, pools could b e developed to temporarily store water and to allow it to percolate into the aquifer or to allow the water to be diverted into adjacent basins for recharge.

A pool capacity analysis was performed for several pool alternatives along each creek alignment. Potential pool locations were identifie d that maximize the pool depth and length of pool upstream of the check structure. Fo r each pool alternative, a conceptual opinion of probable construction cost was developed to weigh the cost and benefit of each pool alternative. The data used for the analy sis was based on work developed from the previous hydraulic capacity analysis. In addition, existing and new basins were considered for recharge outside of the creek channe ls, and estimates of recharge capacity were determined.

Page 2 ends

V:\Clients\Kaweah Delta WCD - 1225\12250901-SUR\_DOCUMENTS\Reports\2010-08-10 Creek Pool and Pond Memo.doc

ANALYSES
The analyses utilized the profiles developed from t he previous topographic survey and HEC-RAS modeling. In addition, all estimates of re charge rates assume, for the limited purposes of this study, a continuous percolation rate of one-half foot per day and that all percolation occurs at the floor of the channel or b asin, not on the embankments. This percolation rate is only an estimate to provide a s ense of relative benefits between alternatives studied and should not be used for any other purpose until verified through actual field tests and studies. The pools, check s tructures, and recharge basins considered for this study along each creek are show n in the attached creek plan and profile drawings.

Pool Location Selection

The portions of each creek modeled in HEC-RAS were reviewed for suitability for water storage pools. Check structures were assumed to be required to create the pools. For the purposes of this study, “check structures” coul d refer to new concrete structures, existing concrete structures, temporary earthen dam s, or existing bridges or culverts with new or existing board guides. It was assumed that the check structures should be located in areas easily accessed by District or Cit y staff for operations and maintenance purposes. Other considerations for locating the ch eck structures were the available channel freeboard, high water levels determined fro m the HEC-RAS model, depth of channel upstream of the potential check structure a nd the proximity of the site to provide benefits to the City’s groundwater.

To determine estimated pool volumes, channel cross sections from the HEC-RAS model were reviewed along with pool water surface e levations. Pool water surface elevations were selected to maintain at least one-f oot of freeboard (when possible) in the channel. Channel cross-sectional areas were es timated every 1,000 feet along each pool, with most pools being approximately 6,000 to 8,000 feet long.

Seven potential pools were identified for Packwood Creek and four were identified for Cameron Creek. See the attached pool volume calcul ations for each creek. The pools identified in this study are summarized in the tables below:

Packwood Creek Pool Summary
Location of
Check
(station)
Type of
Check
Pool Water
Surface
Elev. (feet)
Length of
Pool (feet)
Volume of
Pool (acre-
feet)
Est.

Potential
Monthly
Recharge
(acre-feet)
6+00 (E) Check

306 6,400 11.9 37
56+00 (E) Check

313 8,300 19.0 34
143+00 New Check
of Earthen
Dam
321 5,200 7.7 20

Page 3 ends

V:\Clients\Kaweah Delta WCD - 1225\12250901-SUR\_DOCUMENTS\Reports\2010-08-10 Creek Pool and Pond Memo.doc 208+00 New Check
or Earthen
Dam
330 7,500 13.2 27
280+00 New Check
or Earthen
Dam
336 5,500 9.7 20
300+00 New Check
or Earthen
Dam
340 7,000 15.2 24
376+00 New Check
or Earthen
Dam
348 6,500 15.0 26

Cameron Creek Pool Summary
Location
of Check
(station)
Type of Check Pool Water
Surface
Elev. (feet)
Length of
Pool (feet)
Volume of
Pool (acre-
feet)
Est.

Potential
Monthly
Recharge
(acre-feet)
142+00 New Check or
Earthen Dam
328.5 3,800 5.8 21
203+00 New Check or
Earthen Dam
336 6,900 11.3 50
280+00 New Check or
Earthen Dam
344 7,000 12.2 44
325+00 New Check or
Earthen Dam
349 4,500 13.1 24

Basin Location Selection

In addition to utilizing pools within the creek cha nnels, basins near the creeks were also considered for recharge. A check structure would a gain be required to back water up to be diverted into conveyance facilities leading to t he basins. Several existing basins (shown in light blue) along the Packwood Creek alig nment that may be utilized for recharge, while it appears Cameron Creek has no exi sting adjacent basins. For purposes of estimating costs, it was assumed that a new connection facility between a creek and basin would be required, even if there is an existing connection facility, due to capacity limitations or original intended use. Sev eral existing basins currently used as parks (shown in green) within the City of Visalia a re either adjacent to or near Packwood Creek. However, these were not considered for recharge in all cases because of their current use as parks.

Page 4 ends

V:\Clients\Kaweah Delta WCD - 1225\12250901-SUR\_DOCUMENTS\Reports\2010-08-10 Creek Pool and Pond Memo.doc Packwood Creek Basin Summary
Location of
Basin (station)
Type (Name) of Basin Approx. Basin
Size (acres)
Est. Potential Monthly
Recharge (acre-feet)
56+00 Existing (“Police Station
Basin”)

7.2 110
71+00 Existing (“Food-4-Less”
or “State” Basin)

1.4 20
106+00 New (“Stonebrook
Park”)
5 75
208+00 New Up to 17 Up to 255
280+00 Existing basin/orchard 14 210
320+00 Existing (“Dooley
Basin”)

5.7 85
380+00 Existing/New (including
“Blain Basin”)

7.5 (existing) up
to 100
110 up to 1,400
440+00 Existing (“Oaks Basin”) 28 Up to 420

Cameron Creek Basin Summary
Location of
Basin (station)
Type (Name) of Basin Approx. Basin
Size (acres)
Est. Potential Monthly
Recharge (acre-feet)
325+00 New Up to 80 Up to 1,200

For the purposes of this study, it was assumed new basins would only be constructed on undeveloped land of “significant” size.

Packwood Creek

There is a storm drain line that leads from the Sto nebrook Park drainage facilities to Packwood Creek. It should be fairly easy to tie in to this line and divert water from Packwood Creek into Stonebrook Park. The park woul d need to be reconfigured to allow a significant portion of the park to be flood ed in the summertime. Clearly an effort would need to be made to mitigate the loss of park land. Some mitigation could be as park improvements incorporating the regular presenc e of water as an added park feature.

The new potential Packwood Creek basin at station 2 08+00 listed above is located on a large parcel near an existing mobile home park and railroad tracks which was previously a site of an olive processing plan. The owner of t his parcel already has plans to develop this property but may be willing to conside r a sale alternative in this down development economy. He has not been contacted.

Page 5 ends

V:\Clients\Kaweah Delta WCD - 1225\12250901-SUR\_DOCUMENTS\Reports\2010-08-10 Creek Pool and Pond Memo.doc The potential to expand the existing Blain Basins u p to 100 acres has greater potential given the City of Visalia already owns this propert y. It is slated to be developed into a regional sports park, but given its prime location from a groundwater recharge standpoint, consideration should be given to using it as a recharge site, at least for interim use. It is also well located for potential use for storm water layoff for either Packwood Creek or Mill Creek.

Cameron Creek

Data from the topographic survey indicates that Cam eron Creek is shallower than Packwood Creek, often making it more difficult to form a pool of significant volume using a check structure. However, the portion of Cameron Creek considered for this study is primarily within rural agricultural areas, allowing flexibility in selecting locations for siting and sizing recharge basins. Ideally, the connectio n facility between the creek and any recharge basin would be immediately upstream of a c heck structure to maximize water depth in the basin. General areas to consider rech arge basins along Cameron Creek include immediately east of Lovers Lane to near sta tion 330+00 just downstream of the creek’s headgate. Those areas would also allow for deeper pools when backed up with a new check structure.

A new basin location was selected near a new check structure (near station 325+00) that would put the additional recharge site in good proximity to the City’s current urban boundary. No contact with the current landowner has been made.

SUMMARY
Based on the available data and information, concep tual opinions of construction costs were developed for each check structure and pool op tion considered in this study (see the attached cost breakdowns for further details). A summary of pool improvement alternatives are shown in the tables below for each creek.

Packwood Creek Pool Costs
Location of
Check
(station)
Volume of
Pool (acre-
feet)
Est. Check & Pool
Improvement Costs
(Permanent)
Est. Check & Pool
Improvement Costs
(Temporary)
6+00 11.9 $3,000 n/a
56+00 19.0 $3,000 n/a
143+00 7.7 $58,000 $25,000
208+00 13.2 $187,000 $24,000
280+00 9.7 $203,000 $24,000
300+00 15.2 $178,000 $18,000
376+00 15.0 $173,000 $10,000

Page 6 ends

V:\Clients\Kaweah Delta WCD - 1225\12250901-SUR\_DOCUMENTS\Reports\2010-08-10 Creek Pool and Pond Memo.doc Cameron Creek Pool Costs
Location of
Check
(station)
Volume of
Pool (acre-
feet)
Est. Check & Pool
Improvement Costs
(Permanent)
Est. Check & Pool
Improvement Costs
(Temporary)
142+00 5.8 $9,000 n/a
208+00 11.3 $55,000 $22,000
280+00 12.2 $48,000 $14,000
325+00 13.1 $145,000 $7,000

“Permanent” check and pool improvements include the construction of a permanent standalone concrete check structure with provisions for board guides. “Temporary” check and pool improvements include the constructio n of an earthen dam with a corrugated metal pipe (CMP) water control structure located within the dam. This control structure would likely consist of a large d iameter CMP vertical riser half pipe with board guides, with a horizontal outlet pipe that wo uld have the capability to convey nominal creeks flows without removing the dam. An example of such a structure is shown in Figure 1 below.

Figure 1 – CMP Half Pipe Structure

In addition, it is estimated that most tie-in facil ities used for connecting a creek to an adjacent basin would likely have construction costs in the range of $100,000 to $150,000, depending on size and capacity requirements.

Page 7 ends

V:\Clients\Kaweah Delta WCD - 1225\12250901-SUR\_DOCUMENTS\Reports\2010-08-10 Creek Pool and Pond Memo.doc

NEXT STEPS
Additional work to further investigate the feasibil ity of creek and/or basin recharge activities includes:

• Performing geotechnical, insitu seepage, and/or fl ow measurement tests to verify the percolation rates within the creek channels and basins considered in this study in order to refine estimates of the amount of potential recharge capacity of the creeks and basins considered in this study;

• Refine construction estimates for check structures and basin tie-ins and prioritize projects to pursue and construct.

Additional topics to be explored include the need t o meet the future conveyance demands of Tulare Irrigation District for these cre eks and to assist the City of Visalia in utilizing these creeks as storm water control facilities:

• Reviewing how these creeks can best be used to all ow Tulare Irrigation District to meet their future conveyance demands and identify n ecessary improvements.

Some of this is expected to be accomplished as part of the Tulare Irrigation District’s System Optimization Review Study currently underway;

• Reviewing how these creeks can best be integrated in the City of Visalia’s storm water master plan.

Kaweah Delta Water Conservation District
Packwood and Cameron Creeks Reconaissance Study
Creek Pool Volume Estimates
JOB #: 1225 0901
COMP. BY: ASC
CHKD. BY:

DATE: 8/11/2010
Packwood Creek
Check Sta: 6+00
Water surface elev: 306 ft
Sta Floor Elev Area Volume (CF) Volume (AF)
639 300 184
1,000 300.4 185 73696 1.7
2,000 300.6 105 145174 3.3
3,000 301.4 106 105788 2.4
4,000 302.5 69 87349 2.0
5,000 303 58 63500 1.5
6,000 304.8 15 36783 0.8
End 7,000 7548 0.2
Total 519838 11.9
Check Sta: 56+00
Water surface elev: 313 ft
Sta Floor Elev Area Volume (CF) Volume (AF)
5,500 304.3 353
6,000 304.8 230 116518 2.7
7,000 305.8 177 203517 4.7
8,000 306.7 146 161615 3.7
9,000 307.6 102 124153 2.9
10,000 308.9 74 88164 2.0
11,000 309.8 49 61541 1.4
12,000 310.5 29 39159 0.9
13,000 311.4 21 24979 0.6
End 13,800 8278 0.2
Total 827924 19.0
Check Sta: 143+00
Water surface elev: 321 ft
Sta Floor Elev Area Volume (CF) Volume (AF)
14,500 314.3 120
15,000 315.6 105 78830 1.8
16,000 317.3 93 98950 2.3
17,000 316.9 77 85139 2.0
18,000 318.9 25 51204 1.2
19,000 320.1 12 18341 0.4
End 19,700 4089 0.1
Total 336553 7.7
V:\Clients\Kaweah Delta WCD - 1225\12250901-SUR\_DO CUMENTS\Calculations\Creek Pool Volumes Kaweah Delta Water Conservation District
Packwood and Cameron Creeks Reconaissance Study
Creek Pool Volume Estimates
JOB #: 1225 0901
COMP. BY: ASC
CHKD. BY:

DATE: 8/11/2010
Check Sta: 208+00
Water surface elev: 330 ft
Sta Floor Elev Area Volume (CF) Volume (AF)
20,501 321.65 194
21,000 322 199 39375 0.9
22,000 322.5 157 178374 4.1
23,000 324.1 129 143137 3.3
24,000 326.5 49 89144 2.0
25,000 327 46 47666 1.1
26,000 328.3 40 42753 1.0
27,000 328.9 15 27092 0.6
End 28,000 7304 0.2
Total 574844 13.2
Check Sta: 280+00
Water surface elev: 336 ft
Sta Floor Elev Area Volume (CF) Volume (AF)
28,000 330 164
29,000 330.4 135 149779 3.4
30,000 331.4 91 112817 2.6
31,000 331.8 65 77803 1.8
32,000 332.6 44 54743 1.3
33,000 335.3 7 25644 0.6
End 33,500 1725 0.0
Total 422512 9.7
Check Sta: 300+00
Water surface elev: 340 ft
Sta Floor Elev Area Volume (CF) Volume (AF)
30,000 331.45 234
31,000 331.8 187 210886 4.8
32,000 332.6 151 169217 3.9
33,000 335.3 81 116098 2.7
34,000 337.1 56 68685 1.6
35,000 337.65 42 48915 1.1
36,000 337.95 26 33974 0.8
End 37,000 13217 0.3
Total 660992 15.2
V:\Clients\Kaweah Delta WCD - 1225\12250901-SUR\_DO CUMENTS\Calculations\Creek Pool Volumes Kaweah Delta Water Conservation District
Packwood and Cameron Creeks Reconaissance Study
Creek Pool Volume Estimates
JOB #: 1225 0901
COMP. BY: ASC
CHKD. BY:

DATE: 8/11/2010
Check Sta: 376+00
Water surface elev: 348 ft
Sta Floor Elev Area Volume (CF) Volume (AF)
37,501 340 182
38,000 340.75 244 106404 2.4
39,000 341.75 147 195585 4.5
40,000 342.5 119 133179 3.1
41,000 342.3 87 103253 2.4
42,000 344.75 43 65250 1.5
43,000 345.55 26 34887 0.8
End 44,000 13242 0.3
Total 651799 15.0
Cameron Creek
Check Sta: 142+00
Water surface elev: 328.5 ft
Sta Floor Elev Area Volume (CF) Volume (AF)
14,000 321.5 191
15,000 324.2 87 111219 2.6
16,000 325.9 60 73349 1.7
17,000 326.8 40 49903 1.1
End 17,800 16065 0.4
Total 250536 5.8
Check Sta: 203+00
Water surface elev: 336 ft
Sta Floor Elev Area Volume (CF) Volume (AF)
20,000 330.1 178
21,000 331.6 140 111121 2.6
22,000 332 108 123661 2.8
23,000 333 59 83230 1.9
24,000 334 66 62625 1.4
25,000 334.1 48 57106 1.3
26,000 334.6 32 39763 0.9
End 26,900 14266 0.3
Total 491773 11.3
V:\Clients\Kaweah Delta WCD - 1225\12250901-SUR\_DO CUMENTS\Calculations\Creek Pool Volumes Kaweah Delta Water Conservation District
Packwood and Cameron Creeks Reconaissance Study
Creek Pool Volume Estimates
JOB #: 1225 0901
COMP. BY: ASC
CHKD. BY:

DATE: 8/11/2010
Check Sta: 280+00
Water surface elev: 344 ft
Sta Floor Elev Area Volume (CF) Volume (AF)
28,037 337.5 233
28,993 339.14 151 183808 4.2
30,000 339.9 103 128243 2.9
31,000 340.05 70 86611 2.0
32,000 341.55 51 60232 1.4
33,000 342.2 36 43139 1.0
34,000 343.5 10 22689 0.5
End 35,000 4914 0.1
Total 529635 12.2
Check Sta: 325+00
Water surface elev: 349 ft
Sta Floor Elev Area Volume (CF) Volume (AF)
32,335 341.2 228
33,000 342.2 199 141926 3.3
34,000 343.5 156 177517 4.1
35,000 343.9 126 140950 3.2
36,000 346.4 50 87839 2.0
End 36,854 21399 0.5
Total 569630 13.1
V:\Clients\Kaweah Delta WCD - 1225\12250901-SUR\_DO CUMENTS\Calculations\Creek Pool Volumes Item
No. Item Description Estimated
Quantity Unit Unit Price Amount
Station 6+00 Check Improvements (11.9 AF)
1 Raise left bank to maintain freeboard (150 LF) 200 CY $15 $3,000 Total $3,000
Station 56+00 Check Improvements (19.0 AF)
2 Raise both banks to maintain freeboard (100 LF) 200 CY $15 $3,000 Total $3,000
Station 143+00 (West St.) Check Improvements (7.7 AF)
Earth Dam Option
3 Raise both banks to maintain freeboard (600 LF) 1,2 00 CY $15 $18,000 4 Construct earth dam (include overexcavation and sc arification) 50 CY $30 $1,500 5 Construct half pipe CMP riser 1 LS $5,000 $5,000
Total $25,000
Check Structure Option
6 Raise both banks to maintain freeboard (600 LF) 1,2 00 CY $15 $18,000

ENGINEER'S OPINION OF PROBABLE CONSTRUCTION COST

KAWEAH DELTA WATER CONSERVATION DISTRICT

PACKWOOD AND CAMERON CREEKS RECONAISSANCE STUDY
8/10/2010

PACKWOOD CREEK CHECK STRUCTURES AND POND INTERTIES
6 Raise both banks to maintain freeboard (600 LF) 1,200 CY $15 $18,000 7 Modify West Street culvert with board guides 1 LS $40,000 $40,000 Total $58,000
Station 208+00 Check Improvements (13.2 AF)
Earth Dam Option
8 Raise right bank to maintain freeboard (600 LF) 1,1 00 CY $15 $16,500 9 Construct earth dam (include overexcavation and sc arification) 70 CY $30 $2,100 10 Construct half pipe CMP riser 1 LS $5,000 $5,000
Total $24,000
Check Structure Option
11 Raise right bank to maintain freeboard (600 LF) 1, 100 CY $15 $16,500 12 Construct new check structure (no gates) 1 LS $150,0 00 $150,000 13 Channel improvements around structure (lining, rip rap, etc.) 1 LS $20,000 $20,000 Total $187,000
Optional for Basin Recharge
14 Construct tie-in to proposed basin south of creek 1 LS $110,000 $110,000 V:\Clients\Kaweah Delta WCD - 1225\12250901-SUR\_DO CUMENTS\Calculations\Creek Checks and Ponds Cost Estimate FORM EE2 (Nov 2004) Item
No. Item Description Estimated
Quantity Unit Unit Price Amount

ENGINEER'S OPINION OF PROBABLE CONSTRUCTION COST

KAWEAH DELTA WATER CONSERVATION DISTRICT

PACKWOOD AND CAMERON CREEKS RECONAISSANCE STUDY
8/10/2010

PACKWOOD CREEK CHECK STRUCTURES AND POND INTERTIES
Station 280+00 Check Improvements (9.7 AF)
Earth Dam Option
15 Raise right bank to maintain freeboard (600 LF) 1, 100 CY $15 $16,500 16 Construct earth dam (include overexcavation and s carification) 70 CY $30 $2,100 17 Construct half pipe CMP riser 1 LS $5,000 $5,000
Total $24,000
Check Structure Option
18 Raise right bank to maintain freeboard (1100 LF) 2 ,200 CY $15 $33,000 19 Construct new check structure (no gates) 1 LS $150,0 00 $150,000 20 Channel improvements around structure (lining, rip rap, etc.) 1 LS $20,000 $20,000 Total $203,000
Optional for Basin Recharge
21 Construct tie-in to existing orchard/basin east o f creek 1 LS $110,000 $110,000 Station 300+00 Check Improvements (15.2 AF)
Earth Dam Option Earth Dam Option
22 Raise both banks to maintain freeboard (450 LF) 70 0 CY $15 $10,500 23 Construct earth dam (include overexcavation and s carification) 70 CY $30 $2,100 24 Construct half pipe CMP riser 1 LS $5,000 $5,000
Total $18,000
Check Structure Option
25 Raise left bank to maintain freeboard (450 LF) 500 CY $15 $7,500 26 Construct new check structure (no gates) 1 LS $150,0 00 $150,000 27 Channel improvements around structure (lining, rip rap, etc.) 1 LS $20,000 $20,000 Total $178,000
V:\Clients\Kaweah Delta WCD - 1225\12250901-SUR\_DO CUMENTS\Calculations\Creek Checks and Ponds Cost Estimate FORM EE2 (Nov 2004) Item
No. Item Description Estimated
Quantity Unit Unit Price Amount

ENGINEER'S OPINION OF PROBABLE CONSTRUCTION COST

KAWEAH DELTA WATER CONSERVATION DISTRICT

PACKWOOD AND CAMERON CREEKS RECONAISSANCE STUDY
8/10/2010

PACKWOOD CREEK CHECK STRUCTURES AND POND INTERTIES
Station 376+00 Check Improvements (15.0 AF)
Earth Dam Option
28 Raise both banks to maintain freeboard (150 LF) 20 0 CY $15 $3,000 29 Construct earth dam (include overexcavation and s carification) 70 CY $30 $2,100 30 Construct half pipe CMP riser 1 LS $5,000 $5,000
Total $10,000
Check Structure Option
31 Raise both banks to maintain freeboard (150 LF) 20 0 CY $15 $3,000 32 Construct new check structure (no gates) 1 LS $150,0 00 $150,000 33 Channel improvements around structure (lining, rip rap, etc.) 1 LS $20,000 $20,000 Total $173,000
Optional for Basin Recharge
34 Construct tie-in to existing basin north of creek 1 LS $110,000 $110,000 35 Construct tie-in to existing basin south of creek 1 LS $110,000 $110,000 36 Construct tie-in to proposed basins north of cree k 1 LS $110,000 $110,000 37 Construct tie-in to proposed basins south of creek 1 LS $110,000 $110,000 Total $440,000
NOTE(S):

Excludes costs for proposed basin construction.

Excludes mobilization/demobilization, bonds, insurance, etc.

V:\Clients\Kaweah Delta WCD - 1225\12250901-SUR\_DO CUMENTS\Calculations\Creek Checks and Ponds Cost Estimate FORM EE2 (Nov 2004) Item
No. Item Description Estimated
Quantity Unit Unit Price Amount
Station 142+00 Check Improvements (5.8 AF)
1 Raise left bank to maintain freeboard (500 LF) 600 CY $15 $9,000 Total $9,000
Station 208+00 Check Improvements (11.3 AF)
Earth Dam Option
2 Raise both banks to maintain freeboard (800 LF) 1,0 00 CY $15 $15,000 3 Construct earth dam (include overexcavation and sc arification) 50 CY $30 $1,500 4 Construct half pipe CMP riser 1 LS $5,000 $5,000
Total $22,000
Check Structure Option
5 Raise banks to maintain freeboard (800 LF) 1,000 CY $ 15 $15,000 6 Modify Lovers Lane culvert with board guides 1 LS $40,000 $40,000 Total $55,000
Station 280+00 Check Improvements (12.2 AF)
Earth Dam Option
7 Raise right bank to maintain freeboard (600 LF) 500 CY $15 $7,500

ENGINEER'S OPINION OF PROBABLE CONSTRUCTION COST

KAWEAH DELTA WATER CONSERVATION DISTRICT

PACKWOOD AND CAMERON CREEKS RECONAISSANCE STUDY

CAMERON CREEK CHECK STRUCTURES AND POND INTERTIES
8/10/2010
7 Raise right bank to maintain freeboard (600 LF) 500 CY $15 $7,500 8 Construct earth dam (include overexcavation and sc arification) 50 CY $30 $1,500 9 Construct half pipe CMP riser 1 LS $5,000 $5,000
Total $14,000
Check Structure Option
10 Raise right bank to maintain freeboard (600 LF) 50 0 CY $15 $7,500 11 Modify Road 148 culvert with board guides 1 LS $40,000 $40,000 Total $48,000
V:\Clients\Kaweah Delta WCD - 1225\12250901-SUR\_DO CUMENTS\Calculations\Creek Checks and Ponds Cost Estimate FORM EE2 (Nov 2004) Item
No. Item Description Estimated
Quantity Unit Unit Price Amount

ENGINEER'S OPINION OF PROBABLE CONSTRUCTION COST

KAWEAH DELTA WATER CONSERVATION DISTRICT

PACKWOOD AND CAMERON CREEKS RECONAISSANCE STUDY

CAMERON CREEK CHECK STRUCTURES AND POND INTERTIES
8/10/2010
Station 325+00 Check Improvements (13.1 AF)
Earth Dam Option
12 Construct earth dam (include overexcavation and s carification) 70 CY $30 $2,100 13 Construct half pipe CMP riser 1 LS $5,000 $5,000
Total $7,000
Check Structure Option
14 Construct new check structure (no gates) 1 LS $150,0 00 $125,000 15 Channel improvements around structure (lining, rip rap, etc.) 1 LS $20,000 $20,000 Total $145,000
Optional for Basin Recharge
16 Construct tie-in to proposed basin south of creek 1 LS $250,000 $250,000 NOTE(S):

Excludes costs for proposed basin construction.

Excludes mobilization/demobilization, bonds, insurance, etc.

Excludes costs for proposed basin construction.

V:\Clients\Kaweah Delta WCD - 1225\12250901-SUR\_DO CUMENTS\Calculations\Creek Checks and Ponds Cost Estimate FORM EE2 (Nov 2004)