4Creeks, Inc. Fee Schedule – Construction Management
Fees are based on the median hourly pay rate for employees in each classification, plus, indirect costs, overhead, and profit. These rates are effective for one year from the contract execution date.
Classification Charges Per Hour
Construction Inspection (Non-Prevailing Wage)
Associate Construction Inspector* $129
Construction Inspector* $155
Senior Construction Inspector* $175
Construction Management
Associate Construction Manager $139
Construction Manager $170
Senior Construction Manager $196
Principal Construction Manager $216
Construction Inspection (Prevailing Wage)
Construction Inspector $170 -$205
Construction Inspector - Over Time $220-$305
Construction Inspector – Double Time $260-$325
Direct Charges
At cost plus fifteen percent (15%):
• Printing and reproduction: $0.03 per b/w copy, $0.12 per color copy, $0.80 per sq. ft. large printing • Equipment rentals, subcontractors, laboratory analyses *Prevailing wage rates are subject to change based on the DIR updates.
A-1
A&M Consulting Engineers
EXHIBIT “A”
2026 HOURLY RATE SCHEDULE
CLASSIFICATION RATE
Principal ................................................................................................................ $200.00/Hour Grant Writer.......................................................................................................... $130.00/Hour Professional Engineer 3 ........................................................................................ $185.00/Hour Professional Engineer 2 ........................................................................................ $175.00/Hour
Professional Engineer 1 ........................................................................................ $165.00/Hour Assistant Engineer 3 ............................................................................................. $140.00/Hour
Assistant Engineer 2 ............................................................................................. $135.00/Hour Assistant Engineer 1 ............................................................................................. $120.00/Hour Professional Land Surveyor 2 ............................................................................... $180.00/Hour
Professional Land Surveyor 1 ............................................................................... $1
75.00/Hour
Assistant Land Surveyor ....................................................................................... $145.00/Hour Environmental Consultant .................................................................................... $170.00/Hour Environmental, Health & Safety Officer .............................................................. $150.00/Hour Construction Engineer........................................................................................... $165.00/Hour Construction Observer ......................................................................................... $155.00/Hour Construction Administrator .................................................................................. $110 .00/Hour
Technical Assistance...... ....................................................................................... $140.00/Hour Engineering Aide .................................................................................................. $110.00/Hour Survey Party Mobilization
.................................................................................... $100.00/Hour 1-Man Survey Party .............................................................................................. $180.00/Hour 2-Man Survey Party .............................................................................................. $250.00/Hour 3-Man Survey Party .............................................................................................. $350.00/Hour LiDAR Scanner ..................................................................................................... $200.00/Hour Equipment Rental and Associated Expense .............................................................. Cost x 1.10 Materials, Printing, Subconsultant Procurement ....................................................... Cost x 1.10 Mileage ....................................................................................................... @ Current IRS Rate Note: A&M Consulting Engineers General
Engineering Fee Schedule rates are sub-
ject to adjustment annually. Survey party and construction inspector rates are also subject to adjustment upon change in “Prevailing Rate” as determined by the Direc- tor of Industrial Relations, State of California. Fees include vehicle mileage unless specified.
December 4, 2025
Unchong Parry
City of Visalia
315 E. Acequia Avenue
Visalia, CA 93291
Subject: City of Visalia On-Call RFQ No. 24-25-50
Dear Unchong Parry,
CCME is pleased to submit this cost proposal for the City of Visalia On-call.
Project Description
City of Visalia On Call for CM and RE Services
Fee Schedule
Compensation to provide the services required for the subject project, as detailed in this agreement, shall be on a time and materials basis for the necessary personnel and reimbursables at the rates included herein:
CCME, Inc.’s billing rates for 2025/2026 projects:
Classification Hourly Rate
Principal/Principal Construction Manager $280
Senior Construction Manager/RE $215
Construction Manager/Resident Engineer $192
Associate Construction Manager/Engineer $155
Assistant Engineer $124
Labor Compliance/Project Administrator $98
Senior Construction Inspector/Special Insp. $190
Construction Inspector $180
Associate Construction Inspector $145
Prevailing Wages
Senior Construction Inspector $199.46
Construction Inspector $185.56
Cost Proposal Notes and Exclusions:
1. Assumes Regular 8-hour work shifts, overtime may be charged at 1.5 times the listed rate for inspection work.
2. Hourly fee includes overhead, cell phones, vehicles, mileage, computers and profit.
3. Fee is based on non-holidays as defined by Caltrans working day calendar.
4. This cost proposal is negotiable.
Sincerely,
Bryan Kroeger, PE
President
NV5, INC.
Effective 12/1/2025
City of Visalia
On-Call Services for
Construction Management (CM) / Resident Engineer (RE) for Various Capital Improvement Projects
2025 - 2026 Charge Rates Schedule
Professional
Jeff Pallesen, Principal in Charge ............................................................................................... $288.00/hour Kevin Reisz, Project Manager ..................................................................................................... $288.00/hour Construction Management
Construction Manager/Resident Engineer .............................................................. $208.00 - $250.00/hour Senior Resident Engineer .......................................................................................... $250.00 - $328.39/hour *Construction Inspector ............................................................................................ $204.00 - $234.88/hour Labor Compliance/Project Administrator ................................................................. $97.73 - $144.07/hour ODCs:
Vehicle .................................................................................................................................................. No Charge Mileage/Travel Time .......................................................................................................................... No Charge
Rates are effective through December 31, 2026. If contract assignment extends beyond that date, a new rate schedule will be added to the contract and will include an increase of 3% per year for all non-prevailing wage positions.
Litigation support will be billed at $450.00 per hour.
If in the course of the work, it is requested by the City to perform specialized work requiring the addition of outside resources, an 8% markup will be added to invoices for this work. *Indicates positions requiring Prevailing Wage. Rates calculated based on “Prevailing Wage” (PW) for Construction Management as published and required by the State of California (NC-63-3-9-2024- 1).
Rates for Professional Services categories for Principal in Charge and Project Manager have been voluntarily reduced for this contract.
FAR Overhead Rate: 139.27%
Fee: 10%
FAR Multiplier: 2.3927