October 6, 2025
Request for Proposals
for
2026 Visalia Short Range Transit Plan (SRTP)/Reimagine Study
from the
Tulare County Association of Governments (TCAG)
210 N. Church St., Suite B,
Visalia, California 93291
Phone: 559-623-0450
Fax: 559-733-6720
Contact: Sheela Bhongir
Email: [email protected]
Web: www.tularecog.org
Proposal Submittal Deadline November 14th 5:00PM
I. Introduction to the Request for Proposals (RFP)
The Tulare County Association of Governments (TCAG), as the Metropolitan Planning Organization and the Regional Transportation Planning Agency (RTPA) for Tulare County, is requesting proposals from qualified consultants on behalf of the City of Visalia for the preparation of the 2026 Visalia Short Range Transit Plan (SRTP)/Reimagine Study. The objective of this RFP is to select a qualified consultant to thoroughly analyze existing transit services, including new micro transit pilot data, to fundamentally “reimagine” the Visalia Transit (VT) public transit system. Successful proposals will explain the analytic methods to be utilized and how they will deliver a redesigned public transportation system that is intuitive, convenient, efficient, and which effectively meets the mobility needs of the local transit-reliant population. A brief history of their transit system, including ongoing challenges and opportunities for growth are described in the Scope of Services document. A joint venture of firms or a single firm for all or part of the tasks described is acceptable to accomplish the anticipated Scope of Services outlined in Attachment A.
II. Scope of Services
Attachment A identifies the Scope of Services.
III. Selection Timeline
October 6 Distribution of Request for Proposals
October 27th Deadline for Written inquiries/questions
November 4th Responses Posted on TCAG website
November 14th Proposals Due to TCAG by 5:00 PM
December 3 & 4th Interviews (potential)
February 23th Consultant selection by TCAG Board
February 24th Finalize Contract
February 25th Work begins
IV. Budget & Consultant Administration Responsibilities
1. Working meetings: Schedule and coordinate all necessary working meetings with Visalia Transit Project Manager, Visalia Transit staff and as needed TCAG staff.
2. Budget: The project is budgeted for Fiscal Year 2025/26. Proposer is expected to provide a price proposal and a detailed budget for completion of all work outlined within the attached scope of work. Ten percent retention will be held for the preparation of the final report and released at contract completion. The desired timeline for completion of the study is 10-12 months after the project kickoff. Proposals with project schedules longer than 12 months will be accepted if a written justification for the extended timeline is provided.
3. Invoices and progress reports: Invoices and accompanying progress reports shall be submitted monthly. All invoices shall include a description of work completed, including the percentage completed for each project task, and the hourly rate and expenditures for each employee or subcontractor. Direct expenses shall include receipts or an acceptable form of backup.
V. Proposal Requirements
1. Firm experience and qualifications: Prospective consultants shall provide a summary description of the firm’s overall qualifications for this project and previous experience on similar or related engagements.
Qualifications and examples of previous related experience/projects should be included for the project manager and each of the key project staff proposed for the project. For each employee that works on this project (except support or clerical), the proposal must list the location of the office that the employee works. Failure to provide the requested information may disqualify a proposal. (15 page maximum)
2. Understanding of the Project: Prospective consultants shall include a narrative introducing the consultant's understanding of the project requirements. The contents of this section are to be determined by the respondent, but should demonstrate a familiarity with transit planning, short range and long-range plans. This section should demonstrate the consultant’s understanding of the preparation of these reports, including complying with state and federal requirements and guidelines.
Prospective consultants should identify in the proposal the types of information needed to complete the Scope of Services.(20 pages maximum)
3. Project Management: Prospective consultants shall designate by name the project manager to be employed. The selected consultant shall not substitute the project manager without prior approval by the VT Transit Manager and TCAG Executive Director. (3 page maximum)
4. Project Personnel: Prospective consultants shall describe the qualifications of all professional personnel assigned to this project, including a summary of similar work or studies each member has performed and a resume of each professional. Project personnel changes require that VT Transit Manager and affiliated TCAG staff are notified. (10 page maximum)
5. References: Prospective consultants shall provide names and contact information for three clients for whom the prospective consultant has performed technical and management assignments of similar complexity to that proposed in this request. At least two references shall be provided for projects on which the proposed and named project manager has worked. Up to one may exclusively include a project on which the proposed professional personnel for this project with the most hours assigned participated in. Full points cannot be awarded for past projects in which the proposed project manager or primary professional assigned did not participate. This could necessitate projects references outside of the work of the proposing firm. A brief summary statement for each assignment shall be provided. (5 page maximum)
6. Subcontracting: If subcontractors are used, prospective consultants must submit a description of each person, firm, and the work to be done by each subcontractor. The VT Transit Manager and TCAG Executive Director must approve all subcontractors and no work may be subcontracted nor the subcontractor changed without the prior approval of the TCAG Executive Director.
7. Methodology: Prospective consultants shall describe the approach to the project, specific techniques that will be used, what the reports will include, and the specific administrative and operational management expertise that will be employed. (10 page maximum)
8. Conflict of Interest: Prospective consultants shall disclose any financial, business or other relationship with TCAG, any of the eight incorporated cities in Tulare County, the County of Tulare, or any of their officers or officials that may have an impact on the outcome of th e project. The prospective consultant shall also list current clients who may have a financial interest in the outcome of the project.
9. Project Costs: Prospective consultants shall include a cost proposal section or exhibit demonstrating the total cost of the work solicited under this RFP , by task . For each task, estimated costs for should be broken down . Cost proposals shall detail all direct and indirect costs to be incurred for the project, broken down by task, and shall include the labor rates.
10. Signature: The proposal and accompanying certifications shall be signed by an official (or officials, as applicable) authorized to bind the consultant and shall contain a statement to the effect that the proposal is a firm offer for a 90 -day period. The proposal shall also provide the following information:
type of business entity (i.e. corporation, California limited partnership, etc.) and whether the business entity is registered to do business in California; and name, title, address, and telephone number of individuals with authority to negotiate and contractually bind the company.
11. Insurance Requirements: TCAG will require the selected consultant to obtain and maintain, at consultant's sole cost and expense, insurance coverage as outlined in the attached Sample Consultant Services Contract (Attachment D).
The selected consultant shall maintain said insurance policies in effect during the term of the contract and shall cause all parties supplying services, labor, or materials to maintain insurance in amounts and coverage not less than those specified in the attached Sample Consultant Services Contract.
The selected consultant shall file certifications of this insurance, including all applicable endorsements, with TCAG prior to commencement of its performance under this agreement. Consultant must maintain adequate levels of insurance throughout the duration of the agreement.
12. Indemnity and Harmless Clause: TCAG will require the selected consultant to hold harmless, defend and indemnify TCAG, their officers, employees and agents from any liability, claims, actions, costs, damages or losses, for injury, including death to any person, or damage to any property arising out of the consultant's services, in accordance with the indemnity language included in the Sample Consultant Services Contract (Attachment E).
13. Ineligible Bidders: Each consultant must certify that it is not included on the U.S. Comptroller General's Consolidated List of Persons or Firms Currently Debarred for Violations of Various Public Contracts Incorporating Labor Standards Provisions. Attachment B must be properly completed and submitted with the proposal.
14. Disadvantaged Business Enterprise (DBE): (only for federally-funded projects) It is the policy of the U.S.
Department of Transportation that minority and women-owned business enterprises (herein referred to as DBEs) shall have the maximum opportunity to participate in the performance of contracts financed in whole or in part with federal funds under this agreement.
The proposal must list the percentage of work, by cost expended, to be completed by DBE -certified consulting firms, prime or sub-consultants. Proof of DBE certification for qualified firms is required to be submitted with the proposal. If the percentage is less than 13.5% an explanation of the attempt and
failure to meet this goal must be provided. Failure to provide the requested information may disqualify the proposal.
15. Title VI of the Civil Rights Act of 1964: The contractor agrees to comply with all the requirements imposed by Title VI of the Civil Rights Act of 1964 (49 USC 2000d) and the regulations of the U.S. Department of Transportation issued there under in 49 CFR Part 21.
16. Equal Employment Opportunity : In connection with the performance of this contract, the contractor shall not discriminate against any employee or applicant for employment because of race, color, age, creed, sex, or national origin. Such action shall include, but not be limited to, the following: employment, upgrading, demotion or transfer, recruitment or recruitment advertising, layoff or termination, rates of pay or other forms of compensation, and selection for training, including apprenticeship.
17. Attachments: Attachments A through E are attached herein. Consultants must complete attachments B and C and include them at the end of the proposal.
Attachment A Scope of Services
Attachment B Debarment and Suspension Notification
Attachment C Workers’ Compensation Insurance
Attachment D Insurance Requirements
Attachment E Sample Consultant Services Contract General Terms and Conditions
VI. Scoring Criteria, Submission, and Selection
1. Selection of Successful Consultant: Selection of the successful consultant will be based on information provided in response to the Request for Proposals, information provided by former clients of the consultant for whom work of a similar scope has been done, interviews, if conducted, and consideration of any exceptions taken to the RFP or taken to the proposed contract terms and conditions. Proposals submitted by each consultant will be evaluated separately based on how well each proposal meets the scoring criteria listed below. In the event that a high number of proposals is received, TCAG reserves the right to interview consultant teams with the higher proposal scores.
Scoring Criteria Points
The Proposal
Comprehension of Project 15
Thoroughness of Proposal 10
Meeting the Project Objectives 25
Project Delivery Time 5
Consultant Qualifications
Qualifications and Experience 25
References 15
Cost
Reasonableness of Cost 5
Subtotal 100
Local Firm1 5
Total Possible Points (RFP) 105
Total Possible Points (Interview) 100
1 Local firms are required to meet both of the following:
- Have a local business office in Tulare County; and
- At least 51% of the work to be conducted by employees in the local office
2. Contract Award: The selected consultant will execute a contract with TCAG after consultant selection approval. The official selection of the consultant, if any, is anticipated to be made by TCAG at its Monday, February 23, 2026, meeting. Unsuccessful proposals will be notified in writing.
3. Modification or Withdrawal of Proposals: Any proposal received prior to the due date and time specified may be withdrawn or modified by written request of the consultant. However, to be considered, the final modified proposal must be received by the date and time specified above. All verbal modifications of these conditions or provisions are void and ineffective for proposal evaluation purposes. Only written changes issued to consultants by the TCAG Executive Director are authorized and binding.
4. Selection Process: All proposals submitted in response to this request will be screened by a selection committee using the provided scoring criteria. Proposal opening does not constitute the awarding of a contract. The contract is not in force until it is awarded by the TCAG Board and executed by Visalia Transit (VT).
a. TCAG may, during the evaluation process, request from any applicant additional information that TCAG deems necessary to determine the applicant’s ability to perform the required services. If such information is requested, the applicant shall be permitted three (3) working days to submit the information requested.
b. TCAG reserves the right to select the applicant(s) that in its sole judgment best meets the needs of TCAG. The lowest proposed cost is not the sole criterion for recommending a contract award. TCAG reserves the right to reject any and all proposals and/or negotiate with another party or any other party directly.
c. TCAG reserves the right to conduct interviews. Consultants who will be interviewed will be notified by November 24th for interviews on (December 3 or 4th ). TCAG will conduct the interview via Zoom or another electronic medium.
5. Rejection of Proposals: Failure to meet the requirements of the Request for Proposals will be cause for rejection of the proposal. TCAG may reject any proposal if it is conditional, incomplete, contains irregularities, or has inordinately high or low costs. TCAG reserves the right to reject any and all proposals without cause. TCAG may waive an immaterial deviation in a proposal when it determines that waiving a requirement is in the best interest of TCAG. Waiver of an immaterial deviation shall in no way modify the Request for P roposals documents or excuse the applicant from full compliance with the contract requirements, if the applicant is awarded the contract.
6. Public Record: All proposals submitted in response to this RFP shall become the exclusive property of TCAG. At such time as the selection committee recommends a proposal to the TCAG Board and such recommendation appears on the TCAG Board agenda, all proposals submitted in response to this RFP shall become a matter of public record and shall be regarded as public records. If there are any trade or proprietary secrets included by the consultant, the consultant may provide a different copy of the proposal that would be acceptable to release to the public.
7. Method of Payment : Payment to the selected consultant will be made upon successful completion of project tasks as invoiced by the consultant. Pre-award expenses shall not be allowed. Cash advances will not be available.
VII. Other Conditions
1. Reservation of Right to Withdraw RFP and/or Not Award Contract: TCAG reserves the right to amend or withdraw this RFP at any time without prior notice. Revisions to the RFP, if any, will be emailed to all consultants to whom the original RFP was distributed in addition to posting online with the notice of the RFP. Furthermore, TCAG makes no representations that any agreement will be awarded to any consultant responding to this RFP. TCAG expressly reserves the right to reject any and all proposals in response to this RFP without indicating any reasons for such rejection.
2. TCAG Property: All data, documents and other information provided to TCAG by the Contractor shall become property of TCAG.
3. Pre-Contractual Expenses Not Allowed : TCAG shall not, in any event, be liable for any pre -contractual expenses incurred by any consultant. Pre -contractual expenses are defined as expenses incurred by prospective consultants such as:
a. Preparing and submitting a proposal in response to this RFP
b. Negotiating with TCAG on any matter related to this RFP, proposal and/or contractual agreement
c. Any other expenses incurred by the consultant prior to the date of a Notice to Proceed.
VIII. Proposal Submittal
Proposals must be received electronically no later than 5:00 PM on November 14th. It is recommended that a submittal email is sent without an attachment, as attachments may be too large, and access be granted for TCAG to download your document. This could be done via FTP, Dropbox, Hightail, or another service as provided by prospective consultants. Please submit to Sheela Bhongir, at [email protected].
IX. Questions
Questions should be directed to (Sheela Bhongir) at ([email protected]). All questions must be submitted in writing by 5:00 p.m. on October 27th. Questions and responses will be posted in writing on the TCAG website. Please check www.tularecog.org/tcag/rfps-contracts/rfps regularly for amendments or additional information on this RFP. Consultants that are considering responding to this RFP are forbidden from
contacting members of the Tulare County Association of Governments to discuss their proposal. Failure to comply with this requirement may cause your proposal to be denied without review.
Attachment A
SRTP/Reimagine Study - Scope of Work
Background
Initiated by the City of Visalia in 1981 and rebranded in 2010, the Visalia Transit (VT) public transit system provides fixed-route and demand-response transit services within the Visalia Urbanized Area. An estimated population of 146,000 resides in VT's 40 square mile service area.
The CITY finances VT through a combination of fare revenues, Transportation Development Act (sales tax) allocations, and Federal Transit Administration (FTA) Section 5307 funds. A portion of the funding is contributed by the County of Tulare under a contract for the provision of VT service to county residents residing within the city’s urbanized area.
The VT fixed-route service consists of 13 routes. Operating hours are approximately 6:00 a.m. to 9:30 p.m., Monday through Friday, excluding holidays; 8:00 a.m. to 6:30 p.m. on weekends. Twenty-six buses are operated during base level service. Our fixed route services cover three cities (Visalia, Farmerville, Exeter) and surrounding rural communities. This schedule results in an annual total of about 113,680 vehicle revenue hours and 1,615,500 vehicle revenue miles.
The traditional demand-response service, referred to as Dial-a-Ride, operates with approximately five vehicles, during the same days and hours as the fixed route service.
Dial-a-Ride is available to any member of the public, but its priority is to provide complementary paratransit service as called for in the Americans with Disabilities Act (ADA). Existing marketing, fare structure, and operating policies encourage transit patrons to use the fixed routes as the primary service.
The Sequoia Shuttle operates from Visalia to the Sequoia National Park, seven days a week, between the Thursday before Memorial Day weekend through early September.
Operating hours are approximately from 6:00 a.m. to 6:30 p.m. More information is available online at www.SequoiaShuttle.com.
The Visalia V-Line operates 7 days a week to and from Fresno Yosemite International Airport (FAT) and California State University (CSU), Fresno for students and travelers.
The route also serves the Visalia Municipal Airport and Courthouse Park in downtown Fresno.
The newest VT service is an on-demand micro transit pilot called Visalia Connect.
Visalia Connect operates 7 days a week, with the same hours as Fixed Route and DAR services.
Since the emergence of the covid pandemic earlier in this decade, transit agencies nationwide have seen dramatic shifts in travel patterns, demand, and rider behavior.
With ridership still hovering between 50 and 60% of 2019 levels, there is a need for the system to be reinvigorated and “reimagined”. Visalia Transit launched Visalia Connect, the new micro transit service, in June 2025 and is already seeing promising ridership numbers. This suggests that micro transit will provide a valuable supplement to existing transit services, enabling a substantial reconfiguration of fixed routes to provide greater convenience and efficiency.
Staff fully expect to see a SRTP that comprehensively redesigns the Visalia Transit system to increase the convenience of riding transit, reduce travel times, concentrate fixed route services when and where they operate most efficiently, and employ micro transit to effectively fill spatial and temporal gaps in scheduled services.
The Visalia City Council is the policymaking body for the VT system. The CITY Transit Division administers, plans, markets, and monitors the transit system. An independent contractor provides maintenance and operating services. The CITY provides buses, radios, electronic fareboxes, video surveillance system, street furnishings, published information, passes, and transfers.
All vehicles are owned by the City of Visalia. Visalia Transit services are operated by RATP Dev USA. Vehicle maintenance is also performed by the contractor. Exhibit “D” provides a complete list of the transit vehicles owned by the CITY.
Introduction to Project Objectives
The City of Visalia is seeking proposals from qualified consultants for preparation of the 2026 Short Range Transit Plan/Reimagine Study. A thorough review of existing transit services, including a thorough analysis of data collected from the new micro transit pilot program, coupled with an in-depth analysis of travel demands and demographic characteristics, and input from the public and stakeholders, a solid body of knowledge will be developed in order to address project objectives including: the assessment of the current study area conditions; the development of a financially constrained and unconstrained plans for services; and identify and make recommendations for service efficiencies to fundamentally “reimagine” the Visalia Transit Fixed Route System is what Visalia Transit is seeking from this Short Range Transit Plan/Reimagine Study.
The Consultant shall perform all necessary tasks to provide the City with the 2026 SRTP/Reimagine Study. The project shall include, but not be limited to, updating goals and objectives, conducting analysis and evaluations, recommending and prioritizing options for expansion, updating the 5-year operations plan, updating the Capital Improvement Program and Financial Plan, as well as the preparation of draft and final Visalia Transit 2026 Short Range Transit Plan/Reimagine Study and executive summary to VT for adoption.
The CITY requests that the Proposer suggest changes to the scope of work (as a part of the proposal) to achieve the CITY’s stated Project Objectives.
A. Project Objectives
The CITY’s primary objective for this Agreement is to obtain professional assistance in the development of a Short-Range Transit Plan (SRTP) covering FYs 2026-2031, including assessment of existing and future public transit services to meet community needs; General Plan and regional connectivity; overall general financial estimates for recommended scenarios, and service delivery options.
In addition, to fulfill the requirements of the Tulare County Association of Governments (TCAG), the purpose of the SRTP also includes, but is not limited to, the following:
1. To propose specific recommendations for satisfying the long-range objectives of TCAG’s Regional Transportation Plan/ Sustainable Communities Strategy and guide the provision of transit services in the region over the next five (5) years.
2. To serve as a management and policy document for the transit operator, as well as a means of providing FTA and TCAG with information necessary to meet regional programming and planning requirements.
3. To facilitate requests for federal, state, and regional funds for capital and operating purposes through development of a comprehensive Capital Improvement and Financial Plan.
4. To serve as a contributing document that supports the development of TCAG’s Regional Transit Systems Plan and promotes regional connectivity.
5. To develop Key Performance Indicators (KPIs) and targets that will be used to evaluate the operator’s effectiveness as part of the TCAG Triennial Performance Audit of the operator, including resolution of unmet transit needs.
6. To include all statutorily required elements for a short-range transit plan.
B. Proposed Project Tasks
As stated above, the CITY requests that the Proposer suggest changes to the scope of work to achieve the CITY’s stated Project Objectives. Provide a detailed budget and schedule for the following tasks and subtasks:
1. Public Outreach and Coordination
a. The Proposer must ensure that the public is included in the planning process.
To ensure equity, diversity, and inclusion, FTA’s Title VI Circular requirements pertaining to public outreach must be followed rigorously. b. The project will require work with City staff, and the operations contractor.
On-Site work will include on-board surveys of transit riders and at least one (1) meeting with operations contract staff to obtain feedback and suggestions regarding current operations. The survey will be developed with the intent of identifying rider demographics, travel patterns, rider preferences, and top trip generators for transit.
c. A minimum of three (3) presentations to CITY Council are anticipated: one (1) to present results of the initial system evaluation; one (1) to present the preliminary SRTP; and one (1) to present the final plan which should include a more efficient redesigned system with a combination of Fixed Route and Micro Transit or Flex vehicles.
d. Conduct at least four (4) public outreach meetings to obtain feedback regarding system needs and present proposed changes to future service. At least one (1) meeting should be held at TCAG’s Social Services Transportation Advisory Council (SSTAC) and at least one (1) meeting at the College of the Sequoias (COS).
2. Analysis
a. Conduct a critical review of local and regional fixed transit routes in the study area using ride check data, running schedule information, operating data, and financial records provided by Visalia Transit, and user and non-user travel characteristics provided by outreach efforts such as rider/community surveys and driver interviews.
b. Utilize data collected from on-demand micro transit operations to identify patterns including origin and destination points associated with high trip volumes. Propose effective micro transit staging locations or strategies based on results of analysis. This data should also be utilized to develop new fixed routes in places where demand is high enough to warrant scheduled service.
c. Examine revenue vehicle capacity utilization rates and total cost to operate (e.g. fuel/energy, insurance, maintenance, repairs) to propose appropriate vehicle types and sizes for fixed routes and demand- response service.
d. Evaluate all ongoing and upcoming transit capital projects and recommendations, considering how they align with the objectives and recommendations of SRTP.
e. Consider and incorporate all ongoing and upcoming regional coordination efforts with local partnering agencies such as The Tulare County Association of Governments (TCAG), Tulare County Regional Transit Agency (TCRTA) and others directly related to the Cross Valley Corridor. f. Evaluate the Operations and Maintenance contract and any impacts on pricing negotiations to be considered with system redesign.
See Exhibit D Visalia Transit Fleet sheet to incorporate into project proposals
3. Draft and Final Report
a. Produce a draft plan incorporating all the above-described elements.
b. The complete SRTP/Reimagine Study should include all key elements as defined by the Federal Transit Administration (FTA). Those mandatory elements include but are not limited to operational data, service plans, budgets, system assessment, needs assessment, financial plan, public involvement, performance measures, and scenario plan.
Following delivery to CITY staff and presentation to Council, consultants will work with staff to produce a revised study document that addresses any feedback received on the initial draft. The revised document will be presented to Council for adoption.
1. Fixed Route
Fleet #
Fixed
Asset # plate VIN
License
Plate Manufacture Year Bus Make Bus Model
Engine Model
Year
Engine
Manufacturer Engine Model
Engine Family
Name Displacement (L) Fuel Type
Chassis (if
Applicable) Date In-Service Status Retired Date Purchase Price Fed % Grant # Tile Holder Mode Bus
Type Useful Life Condition
Low NOx Certificate
Standard (g/hp-hr)
1301 F13259 15GGD271XD1183073 1387652 2013 Gillig BRT LOWFLOOR 2013 Cummins ISL G DCEXH0540LBG 8.9 CNG 05/13/2013 Active 499,715$ 88.53% CA-95-X200 City of Visalia ROUTE Standard 2025 Good 0.02 1302 F13260 15GGD2711D1183074 1387655 2013 Gillig BRT LOWFLOOR 2013 Cummins ISL G DCEXH0540LBG 8.9 CNG 05/13/2013 Active 499,715$ 88.53% CA-95-X183 City of Visalia ROUTE Standard 2025 Good 0.02 1303 F13261 15GGD2713D1183075 1387654 2013 Gillig BRT LOWFLOOR 2013 Cummins ISL G DCEXH0540LBG 8.9 CNG 05/13/2013 Active 499,715$ 88.53% CA-95-X183 City of Visalia ROUTE Standard 2025 Good 0.02 1304 F13262 15GGD2715D1183076 1387653 2013 Gillig BRT LOWFLOOR 2013 Cummins ISL G DCEXH0540LBG 8.9 CNG 05/13/2013 Active 499,715$ 88.53% CA-95-X183 City of Visalia ROUTE Standard 2025 Good 0.02 1601 F14793 15GGD2718G1187630 1414507 2016 Gillig BRT LOWFLOOR 2016 Cummins ISL G GCEXH0540LBI 8.9 CNG 08/09/2016 Active 553,013$ 88.53% CA-95-X333 City of Visalia ROUTE Standard 2028 Good 0.02 1602 F14794 15GGD271XG1187631 1414508 2016 Gillig BRT LOWFLOOR 2016 Cummins ISL G GCEXH0540LBI 8.9 CNG 08/09/2016 Active 553,013$ 88.53% CA-95-X333 City of Visalia ROUTE Standard 2028 Good 0.02 1603 F15026 15GGD2711G1187632 1414521 2016 Gillig BRT LOWFLOOR 2016 Cummins ISL G GCEXH0540LBI 8.9 CNG 12/12/2016 Active 552,417$ 88.53% CA-95-X333 City of Visalia ROUTE Standard 2028 Good 0.02 1604 F15027 15GGD2713G1187633 1414522 2016 Gillig BRT LOWFLOOR 2016 Cummins ISL G GCEXH0540LBI 8.9 CNG 12/12/2016 Active 552,417$ 88.53% CA-95-X333 City of Visalia ROUTE Standard 2028 Good 0.02 1605 F15028 15GGD2715G1187634 1414519 2016 Gillig BRT LOWFLOOR 2016 Cummins ISL G GCEXH0540LBI 8.9 CNG 12/12/2016 Active 552,417$ 88.53% CA-95-X333 City of Visalia ROUTE Standard 2028 Good 0.02 1606 F15029 15GGD2717G1187635 1414520 2016 Gillig BRT LOWFLOOR 2016 Cummins ISL G GCEXH0540LBI 8.9 CNG 12/12/2016 Active 552,417$ 88.53% CA-95-X333 City of Visalia ROUTE Standard 2028 Good 0.02 1607 F15976 15GGD2719G1187636 1414523 2016 Gillig BRT LOWFLOOR 2016 Cummins ISL G GCEXH0540LBI 8.9 CNG 12/12/2016 Active 552,417$ 88.53% CA-95-X333 City of Visalia ROUTE Standard 2028 Good 0.02 1801 F16196 1M9TH16J6JL816252 1442465 2018 Proterra CATALYST E2 Electricity 11/01/2018 Active 894,965$ 80.00% C-51034-A City of Visalia ROUTE Standard 2030 Excellent 1802 F16200 1M9TH16J1JL816255 1442467 2018 Proterra CATALYST E2 Electricity 11/01/2018 Active 894,965$ 80.00% C-51034-A City of Visalia ROUTE Standard 2030 Excellent 1803 F16201 1M9TH16J1JL816257 1442466 2018 Proterra CATALYST E2 Electricity 11/01/2018 Active 894,965$ 80.00% C-51034-A City of Visalia ROUTE Standard 2030 Excellent 2101 F17052 7JZTG12J9ML000413 1485752 2021 Proterra CATALYST E2 Electricity 10/01/2021 Active 899,499$ 88.53% CA-2020-195 City of Visalia ROUTE Standard 2033 Excellent 2102 F17053 7JZTG12J0ML000414 1485753 2021 Proterra CATALYST E2 Electricity 10/01/2021 Active 899,499$ 88.53%/85.00% CA-2020-072 City of Visalia ROUTE Standard 2033 Excellent 2103 F17054 7JZTG12J2ML000415 1485754 2021 Proterra CATALYST E2 Electricity 10/01/2021 Active 899,499$ 88.53%/85.00% CA-2020-072 City of Visalia ROUTE Standard 2033 Excellent 2104 F17055 7JZTG12J4ML000416 1485755 2021 Proterra CATALYST E2 Electricity 10/01/2021 Active 899,499$ 88.53%/85.00% CA-2020-072 City of Visalia ROUTE Standard 2033 Excellent 2301 5FYB8KJ02PF106730 1485843 2023 New Flyer XE35 Electricity 12/01/2023 Active 85.00% CA-2022-099 City of Visalia ROUTE Standard 2035 Excellent 2302 5FYB8KJ04PF106731 1485844 2023 New Flyer XE35 Electricity 12/02/2023 Active 85.00% CA-2022-099 City of Visalia ROUTE Standard 2035 Excellent 2401 15GGB2819R3199085 1606139 2024 Gillig Low Floor Electricity 985,355$ 85.00% CA-2022-187 City of Visalia ROUTE Standard 2036 Excellent 2402 15GGB2810R3199086 1606140 2024 Gillig Low Floor Electricity 985,355$ 88.53% CA-2022-099 City of Visalia ROUTE Standard 2036 Excellent 6267 F11437 1VHGF3W2886704161 1278510 2008 Orion ORV 2008 Cummins ISL G BCEXH0540LBD 8.8 CNG 10/09/2008 Active 441,370$ 80.00% CA-90-Y473 City of Visalia ROUTE Standard 2020 Good 0.02 6268 F11433 1VHGF3W2286704270 1278511 2008 Orion ORV 2008 Cummins ISL G BCEXH0540LBD 8.8 CNG 10/09/2008 Active 441,370$ 80.00% CA-90-Y473 City of Visalia ROUTE Standard 2020 Good 0.02 6269 F11432 1VHGF3W2486704271 1278512 2008 Orion ORV 2008 Cummins ISL G BCEXH0540LBD 8.8 CNG 10/14/2008 Active 441,370$ 80.00% CA-90-Y473 City of Visalia ROUTE Standard 2020 Good 0.02 6270 F11434 1VHGF3W2986704279 1278513 2008 Orion ORV 2008 Cummins ISL G BCEXH0540LBD 8.8 CNG 10/14/2008 Active 441,370$ 80.00% CA-90-Y473 City of Visalia ROUTE Standard 2020 Good 0.02 6271 F11436 1VHGF3W2586704280 1278514 2008 Orion ORV 2008 Cummins ISL G BCEXH0540LBD 8.8 CNG 10/14/2008 Active 441,370$ 80.00% CA-90-Y473 City of Visalia ROUTE Standard 2020 Good 0.02 6272 F11435 1VHGF3W2086704283 1278515 2008 Orion ORV 2008 Cummins ISL G BCEXH0540LBD 8.8 CNG 10/14/2008 Retired 441,370$ 80.00% CA-90-Y473 City of Visalia ROUTE Standard 2020 Good 0.02 6273 F11429 1VHGF3W2886704290 1278516 2008 Orion ORV 2008 Cummins ISL G BCEXH0540LBD 8.8 CNG 10/14/2008 Active 447,372$ 88.53% CA-95-X039 City of Visalia ROUTE Standard 2020 Good 0.02 6274 F11428 1VHGF3W2X86704291 1278517 2008 Orion ORV 2008 Cummins ISL G BCEXH0540LBD 8.8 CNG 11/17/2008 Active 447,372$ 88.53% CA-95-X039 City of Visalia ROUTE Standard 2020 Good 0.02 6276 F11431 1VHGF3W2286704298 1293273 2008 Orion ORV 2008 Cummins ISL G BCEXH0540LBD 8.8 CNG 11/21/2008 Active 447,372$ 88.53% CA-95-X039 City of Visalia ROUTE Standard 2020 Good 0.02 6283 F12554 1VHGH3W20A6706065 1320149 2010 Orion FXRB 2010 Cummins ISL G ACEXH0540LBD 8.9 CNG 03/25/2010 Active 483,471$ 88.53% CA-95-X046 City of Visalia ROUTE Standard 2022 Good 0.02 6284 F12555 1VHGH3W20A6706597 1320142 2010 Orion FXRB 2010 Cummins ISL G ACEXH0540LBD 8.9 CNG 07/24/2010 Active 483,471$ 88.53% CA-95-X046 City of Visalia ROUTE Standard 2022 Good 0.02 6285 F12556 1VHGH3W26A6706622 1320141 2010 Orion FXRB 2010 Cummins ISL G ACEXH0540LBD 8.9 CNG 06/04/2010 Active 483,471$ 88.53% CA-95-X046 City of Visalia ROUTE Standard 2022 Good 0.02 6286 F12557 1VHGH3W28A6706623 1320143 2010 Orion FXRB 2010 Cummins ISL G ACEXH0540LBD 8.9 CNG 09/27/2010 Active 483,471$ 88.53% CA-95-X046 City of Visalia ROUTE Standard 2022 Good 0.02 6287 F12558 1VHGH3W29A6706121 1320140 2010 Orion FXRB 2010 Cummins ISL G ACEXH0540LBD 8.9 CNG 04/23/2010 Active 479,209$ 88.53% CA-95-X046 City of Visalia ROUTE Standard 2022 Good 0.02 6288 F12559 1VHGH3W23A6706633 1320138 2010 Orion FXRB 2010 Cummins ISL G ACEXH0540LBD 8.9 CNG 05/17/2010 Active 479,209$ 88.53% CA-95-X046 City of Visalia ROUTE Standard 2022 Good 0.02 6289 F12560 1VHGH3W25A6706634 1320139 2010 Orion FXRB 2010 Cummins ISL G ACEXH0540LBD 8.9 CNG 05/25/2010 Active 479,209$ 88.53% CA-95-X046 City of Visalia ROUTE Standard 2022 Good 0.02
2. Dial-a-Ride
Fleet #
Fixed
Asset # VIN
License
Plate Manufacture Year Bus Make Bus Model
Engine Model
Year
Engine
Manufacturer Engine Model
Engine Family
Name Displacement (L) Fuel Type
Chassis (if
Applicable) Date In-Service Status Retired Date Purchase Price Fed % Grant # Tile Holder Mode Bus
Type Useful Life Condition
Low NOx Certificate
Standard (g/hp-hr)
1101 F12561 1FDFE4FS4BDA68529 1374759 2011 Elkhart Coach Elkhart Coach 2011 Ford V10 BFMXF0265NAT 6.8 CNG Ford 08/29/2011 Active 133,191$ 100.00% CA-95-X152 City of Visalia DAR Cutaway 2018 Good 1102 F12562 1FDFE4FS0BDA68527 1374707 2011 Elkhart Coach Elkhart Coach 2011 Ford V10 BFMXF0265NAT 6.8 CNG Ford 08/29/2011 Active 133,191$ 100.00% CA-95-X152 City of Visalia DAR Cutaway 2018 Good 1103 F12563 1FDFE4FS2BDA72725 1374762 2011 Elkhart Coach Elkhart Coach 2011 Ford V10 BFMXF0265NAT 6.8 CNG Ford 08/29/2011 Active 133,191$ 100.00% CA-95-X152 City of Visalia DAR Cutaway 2018 Good 1104 F12564 1FDFE4FS2BDA68528 1374758 2011 Elkhart Coach Elkhart Coach 2011 Ford V10 BFMXF0265NAT 6.8 CNG Ford 08/29/2011 Active 133,191$ 100.00% CA-95-X152 City of Visalia DAR Cutaway 2018 Good 1105 F12565 1FDFE4FS9BDA68526 1374760 2011 Elkhart Coach Elkhart Coach 2011 Ford V10 BFMXF0265NAT 6.8 CNG Ford 08/29/2011 Active 133,191$ 100.00% CA-95-X152 City of Visalia DAR Cutaway 2018 Good 1106 F12566 1FDFE4FS0BDA68530 1374761 2011 Elkhart Coach Elkhart Coach 2011 Ford V10 BFMXF0265NAT 6.8 CNG Ford 08/29/2011 Active 133,191$ 100.00% CA-95-X152 City of Visalia DAR Cutaway 2018 Good 1950 F16173 1FDEE4F66JDC41819 1559613 2018 Strarcraft Allstar 2018 Ford V10 JFMXF0265NAT 6.8 CNG Ford 03/11/2019 Active 143,770$ 80.00% CA-2018-143 City of Visalia DAR Cutaway 2026 Good 1951 F16174 1FDEE4F64JDC41821 1559611 2018 Strarcraft Allstar 2018 Ford V10 JFMXF0265NAT 6.8 CNG Ford 03/11/2019 Active 143,770$ 80.00% CA-2018-143 City of Visalia DAR Cutaway 2026 Good 1952 F16175 1FDEE4F66JDC41822 1559612 2018 Strarcraft Allstar 2018 Ford V10 JFMXF0265NAT 6.8 CNG Ford 03/11/2019 Active 143,770$ 80.00% CA-2018-143 City of Visalia DAR Cutaway 2026 Good 1953 F16176 1FDEE4F65JDC41827 1559614 2018 Strarcraft Allstar 2018 Ford V10 JFMXF0265NAT 6.8 CNG Ford 03/11/2019 Active 143,770$ 80.00% CA-2018-143 City of Visalia DAR Cutaway 2026 Good 6282 F11616 1FD4E45S38DA18545 1326576 2008 Strarcraft Allstar 2008 Ford V10 8FMXE0265GAT 6.8 CNG Ford 12/01/2008 Retired 12/31/2020 99,257$ 88.53% CA-95-X039 City of Visalia DAR Cutaway 2015 Good
3. Trolley
Fleet #
Fixed
Asset # VIN
License
Plate Manufacture Year Bus Make Bus Model
Engine Model
Year
Engine
Manufacturer Engine Model
Engine Family
Name Displacement (L) Fuel Type
Chassis (if
Applicable) Date In-Service Status Retired Date Purchase Price Fed % Grant # Tile Holder Mode Bus
Type Useful Life Condition
Low NOx Certificate
Standard (g/hp-hr)
1874 F13257 1F66F5DY6D0A04780 1405513 2013 Supreme CLASSIC TROLLY 2013 Ford V10 DFMXF0265NAT 6.8 CNG 08/21/2013 Active 216,580$ 83.00% CA-58-0010 City of Visalia TROLLEY Standard 2025 Good 1829 F13764 1F66F5DY4D0A13395 1405452 2013 Supreme CLASSIC TROLLY 2013 Ford V10 DFMXF0265NAT 6.8 CNG 08/21/2013 Active 214,467$ 83.00% CA-58-0010 City of Visalia TROLLEY Standard 2025 Good
4. Sequoia Shuttle
Fleet #
Fixed
Asset # VIN
License
Plate Manufacture Year Bus Make Bus Model
Engine Model
Year
Engine
Manufacturer Engine Model
Engine Family
Name Displacement (L) Fuel Type
Chassis (if
Applicable) Date In-Service Status Retired Date Purchase Price Fed % Grant # Tile Holder Mode Bus
Type Useful Life Condition
Low NOx Certificate
Standard (g/hp-hr)
106 F10572 1FGXE45S57DA83621 1253475 2007 Strarcraft Allstar 2007 Ford V10 7FMXH06.8AS4 6.8 Gasoline Ford 03/09/2007 Active 73,118$ 88.53% CA-20-X001 City of Visalia SEKI Cutaway 2014 Good 107 F10573 1FGXE45S37DA88235 1253474 2007 Strarcraft Allstar 2007 Ford V10 7FMXH06.8AS4 6.8 Gasoline Ford 03/09/2007 Active 73,118$ 88.53% CA-20-X001 City of Visalia SEKI Cutaway 2014 Good 108 F10574 1FGXE45S77DA88237 1253477 2007 Strarcraft Allstar 2007 Ford V10 7FMXH06.8AS4 6.8 Gasoline Ford 03/09/2007 Active 73,118$ 88.53% CA-20-X001 City of Visalia SEKI Cutaway 2014 Good 109 F10575 1FGXE45S87DA88246 1253472 2007 Strarcraft Allstar 2007 Ford V10 7FMXH06.8AS4 6.8 Gasoline Ford 03/09/2007 Active 73,118$ 88.53% CA-20-X001 City of Visalia SEKI Cutaway 2014 Good 110 F10576 1FGXE45SX7DA88250 1253470 2007 Strarcraft Allstar 2007 Ford V10 7FMXH06.8AS4 6.8 Gasoline Ford 03/09/2007 Active 73,118$ 88.53% CA-20-X001 City of Visalia SEKI Cutaway 2014 Good 111 F10577 1FGXE45SX7DA88247 1253471 2007 Strarcraft Allstar 2007 Ford V10 7FMXH06.8AS4 6.8 Gasoline Ford 03/09/2007 Active 73,118$ 0.00% Non-FTA Funded City of Visalia SEKI Cutaway 2014 Good 112 F10578 1FGXE45S57DA88236 1253473 2007 Strarcraft Allstar 2007 Ford V10 7FMXH06.8AS4 6.8 Gasoline Ford 03/09/2007 Active 73,118$ 0.00% Non-FTA Funded City of Visalia SEKI Cutaway 2014 Good 113 F10579 1FGXE45S47DA88261 1253469 2007 Strarcraft Allstar 2007 Ford V10 7FMXH06.8AS4 6.8 Gasoline Ford 03/09/2007 Active 73,118$ 0.00% Non-FTA Funded City of Visalia SEKI Cutaway 2014 Good 114 F11419 1FD4E45S38DB13638 1312562 2008 Strarcraft Allstar 2008 Ford V10 8FMXH06.8AS4 6.8 Gasoline Ford 07/11/2008 Active 69,047$ 88.53% CA-90Y335 City of Visalia SEKI Cutaway 2015 Good 115 F11421 1FD4E45S58DB13639 1312563 2008 Strarcraft Allstar 2008 Ford V10 8FMXH06.8AS4 6.8 Gasoline Ford 07/03/2008 Active 69,047$ 88.53% CA-90Y335 City of Visalia SEKI Cutaway 2015 Good 116 F11819 1FD4E45SX8DB60164 1339349 2008 Strarcraft Allstar 2009 Ford V10 9FMXE06.8AFA 6.8 Gasoline Ford 09/22/2009 Active 73,137$ 100.00% CA-20-X003 City of Visalia SEKI Cutaway 2016 Good 117 F11820 1FD4E45S98DB60172 1345183 2008 Strarcraft Allstar 2009 Ford V10 9FMXE06.8AFA 6.8 Gasoline Ford 09/22/2009 Active 73,137$ 100.00% CA-20-X003 City of Visalia SEKI Cutaway 2016 Good 118 F13255 1FDFE4FS7DDA59584 1407564 2013 Elkhart Coach Elkhart Coach 2013 Ford V10 DFMXE06.8AFA 6.8 Gasoline Ford 04/17/2013 Active 88,958$ 100.00% CA-20-X011 City of Visalia SEKI Cutaway 2020 Good 119 F13256 1FDFE4FS5DDA59583 1407563 2013 Elkhart Coach Elkhart Coach 2013 Ford V10 DFMXE06.8AFA 6.8 Gasoline Ford 04/17/2013 Active 88,958$ 100.00% CA-20-X011 City of Visalia SEKI Cutaway 2020 Good 120 F14495 1FDFE4FS5FDA17739 1473302 2015 Strarcraft Allstar 2014 Ford V10 EFMXE06.8AFA 6.8 Gasoline Ford 05/01/2015 Active 0.00% Non-FTA Funded City of Visalia SEKI Cutaway 2022 Good 121 F15022 1FDXE45577DA91722 1258808 2007 Glaval Glaval 2007 Ford V10 7FMXH06.8BST 6.8 Gasoline Ford 07/26/2016 Active 2,500$ 0.00% Non-FTA Funded City of Visalia SEKI Cutaway 2023 122 F15025 1FDXE45S07DA91724 1258810 2007 Glaval Glaval 2007 Ford V10 7FMXH06.8BST 6.8 Gasoline Ford 07/26/2016 Active 2,500$ 0.00% Non-FTA Funded City of Visalia SEKI Cutaway 2023 123 F15024 1FDXE45S27DA91725 1258811 2007 Glaval Glaval 2007 Ford V10 7FMXH06.8BST 6.8 Gasoline Ford 07/26/2016 Active 1,000$ 0.00% Non-FTA Funded City of Visalia SEKI Cutaway 2023 124 F15023 1FDXE45S37DA87909 1258814 2007 Glaval Glaval 2007 Ford V10 7FMXH06.8BST 6.8 Gasoline Ford 07/26/2016 Active 1,000$ 0.00% Non-FTA Funded City of Visalia SEKI Cutaway 2023 1201 F12887 15GGB301XC1179190 1368750 2012 Gillig BRT LOWFLOOR 2012 Cummins ISB CCEXH0408BAN 6.7 Diesel Hybrid 03/26/2012 Active 646,763$ 80.00% CA-58-0010 City of Visalia SEKI Standard 2024 Good
VISALIA TRANSIT VEHICLES
Buses
Exhibit D Visalia Transit Fleet
1202 F12886 15GGB3011C1179191 1368755 2012 Gillig BRT LOWFLOOR 2012 Cummins ISB CCEXH0408BAN 6.7 Diesel Hybrid 03/26/2012Active 646,763$ 80.00%CA-58-0010 City of Visalia SEKI Standard 2024Good 1203 F12885 15GGB3013C1179192 1368754 2012 Gillig BRT LOWFLOOR 2012 Cummins ISB CCEXH0408BAN 6.7 Diesel Hybrid 03/26/2012Active 646,763$ 80.00%CA-58-0010 City of Visalia SEKI Standard 2024Good 1204 F12884 15GGB3015C1179193 1368753 2012 Gillig BRT LOWFLOOR 2012 Cummins ISB CCEXH0408BAN 6.7 Diesel Hybrid 03/26/2012Active 646,763$ 80.00%CA-20-X009 City of Visalia SEKI Standard 2024Good 1205 F12883 15GGE3010C1092356 1368751 2012 Gillig BRT LOWFLOOR 2012 Cummins ISB CCEXH0408BAN 6.7 Diesel Hybrid 03/26/2012Active 633,741$ 80.00%CA-58-0010 City of Visalia SEKI Standard 2024Good 1206 F12882 15GGE3012C1092357 1368752 2012 Gillig BRT LOWFLOOR 2012 Cummins ISB CCEXH0408BAN 6.7 Diesel Hybrid 03/26/2012Active 633,741$ 80.00%CA-58-0010 City of Visalia SEKI Standard 2024Good 1820 F15236 15GGE3019J3093295 1442456 2018 Gillig BRT LOWFLOOR 2018 Cummins B6.7 JCEXH0408BAV 6.7 Diesel Hybrid 05/21/2018Active 736,808$ 0.00%NPS Capital City of Visalia SEKI Standard 2030Excellent 1821 F15233 15GGE3010J3093296 1442457 2018 Gillig BRT LOWFLOOR 2018 Cummins B6.7 JCEXH0408BAV 6.7 Diesel Hybrid 05/21/2018Active 736,808$ 0.00%NPS Capital City of Visalia SEKI Standard 2030Excellent
5. V-LINE
Fleet #
Fixed
Asset # VIN
License
Plate Manufacture Year Bus Make Bus Model
Engine Model
Year
Engine
Manufacturer Engine Model
Engine Family
Name Displacement (L) Fuel Type
Chassis (if
Applicable) Date In-Service Status Retired Date Purchase Price Fed % Grant # Tile Holder Mode Bus
Type Useful Life Condition
Low NOx Certificate
Standard (g/hp-hr)
1501 F14688 1FDFE4FS4GDC05487 1473632 2016 Strarcraft Allstar 2016 Ford V10 GFMXF0265NAT 6.8 CNG Ford 11/18/2015Active 123,615$ 80.00%64CC15-00342 City of Visalia V-LINE Cutaway 2022Good 1502 F14686 1FDFE4FS0GDC05487 1473630 2016 Strarcraft Allstar 2016 Ford V10 GFMXF0265NAT 6.8 CNG Ford 11/18/2015Active 123,615$ 80.00%64CC15-00342 City of Visalia V-LINE Cutaway 2022Good 1503 F14687 1FDFE4FS2GDC05488 1473631 2016 Strarcraft Allstar 2016 Ford V10 GFMXF0265NAT 6.8 CNG Ford 11/18/2015Active 123,615$ 80.00%64CC15-00342 City of Visalia V-LINE Cutaway 2022Good 1930 F16438 15GGD3116K3194118 1442508 2019 Gillig BRT LOWFLOOR 2019 Cummins L9N KCEXH0540LBM 8.9 CNG 10/14/2019Active 656,939$ 0.00%CA-2019-135 City of Visalia V-LINE Standard 2031Good 0.02 1931 F16439 15GGD3118K3194119 1442509 2019 Gillig BRT LOWFLOOR 2019 Cummins L9N KCEXH0540LBM 8.9 CNG 10/14/2019Active 656,939$ 0.00%CA-2019-135 City of Visalia V-LINE Standard 2031Good 0.02
6. LOOP Buses
Fleet #
Fixed
Asset # VIN
License
Plate Manufacture Year Bus Make Bus Model
Engine Model
Year
Engine
Manufacturer Engine Model
Engine Family
Name Displacement (L) Fuel Type
Chassis (if
Applicable) Date In-Service Status Retired Date Purchase Price Fed % Grant # Tile Holder Mode Bus
Type Useful Life Condition
Low NOx Certificate
Standard (g/hp-hr)
6278 F11621? 1FD4E45S58DA18529 1320437? 2008 Strarcraft Allstar 2008 Ford V10 8FMXE0265GAT 6.8 CNG Ford 11/21/2008Active 99,257$ 88.53%CA-95-X039 City of Visalia DAR Cutaway 2015Good Revenue Vehicles
Fleet # Fixed Asset # VIN License Plate
Manufacture
Year Make Model Fuel Type
Date In-
Service Status Retired Date
Purchase
Price Fed % Grant # Mode Useful Life Condition # of Seats GVWR (lbs.) Odometer
Reading (mi.)
Odometer
Reading Date
MV1 57WMD1B67EM100041 2015 Mobility VenturesMV1 CNG 03/24/2015Active 60,918$ 100.00%CA-58-0010 Supervisor/Revenue 7 Good 5 MV2 57WMD1B61EM100035 2015 Mobility VenturesMV1 CNG 03/24/2015Active 60,918$ 100.00%CA-58-0010 Supervisor/Revenue 7 Good 5 UT 1FDAX4HR3AEA09043 2010 Ford F-450 Deisel 09/08/2010Active 50,633$ 100.00%CA-20-X003 SEKI Service Truck 7 Good 3 2002 Chevy S-10 Service Truck Parts
Equipment ID assigned by Fleet
VEHICLE PURPOSE EQUIP. ID
PRIUS CAR TRANSIT 223208
N/A GENERAL ALLOCATION (EVERY DIVISION HAS AN ALLOCATION NUMBER)415000 FORD TRUCK SERVICE TRUCK ( USED AT PARK DURING SEASON) 415002 TAHOE SUV TRANSIT 415004
FORD TRUCK TRANSIT BUILDING MAINTENANCE 415006
IONIQ CAR OUTREACH COORDINATOR 415007
SVC Date
FLEET #
VEH
YEAR
PURCHAS
E DATE STATUS MAKE / MODEL FAMILY VIN NUMBER Vin Actual PLATE Y/N
LICENSE
#
PURCHASE
PRICE: Action
Current
Location
Useful
Life Condition Notes
V-1 2006 FORIV TRAILER 4x4 TWDH226P194971 4X4TWDH226P194971 1322773 1322773 18,500.00$ Park V-2 2006 FORIV TRAILER 4x4 TWDH296P194563 4X4TWDH296P194563 1322773 1322772 18,500.00$ Park Frame/body twisted. Next Replacement V-3 2006 FORIV TRAILER 4x4 TWDH286P100374 4X4TWDH296P100374 1322773 1322775 18,500.00$ Park V-5 2006 FORIV TRAILER 4x4 TWDH296P194658 4X4TWDH296P194658 1322773 1322776 18,500.00$ Park V-7 2006 FORIV TRAILER 4x4 TCKH275P094067 4X4TCKH275P094067 1322773 1322771 18,500.00$ Park V-8 2006 FORIV TRAILER 4x4 TWDH276P194626 4X4TWDH276P194626 1322773 1322777 18,500.00$ Park Next Replacement V-9 2006 FORIV TRAILER 4x4 TSMH2060C008704 4X4TSMH206C008704 1322773 1344525 3,995.00$ Park V-10 2006 Retire FORIV TRAILER 4x4 TSMH275JC14843 4X4TSMH275J014848 1344524 175145 3,995.00$ Cain Yard DisposeFlooring beyond repair. Can't be sold (FEMA) V-11 2006 FORIV TRAILER 4x4 TWDH236P194655 4X4TWDH236P194655 1322773 1344526 3,995.00$ Cain Yard V-12 2006 FORIV TRAILER 4x4 TWDH216P194847 4X4TWDH216P194847 1344523 1233184 3,995.00$ Park V-14 2005 Wildwood 4x4 4X4TSMX245C007152 1ED1H2628X1578374 N/A 1414532 13,272.60$ Cain Yard V-17 2006 SUMMIT 4XTTN222X6C764923 N/A N/A 148783 Cain Yard V-18 2021 01/28/2022 Dutchman Kodiak 227BH 4YDT22720MJ970552 1NL1G2728M3043325 1485782 1485781 30,089.72$ Park NEW V-19 2021 01/28/2022 Gulf Stream Enlighten 25BH 1NL1G2728M3043325 4YDT22720MJ970552 1485781 1485782 26,081.14 $ Park NEW
VISALIA TRANSIT VEHICLES
Sequoia Shuttle Trailers
SVC Date
FLEET #
VEH
YEAR
PURCHASE
DATE STATUS MAKE / MODEL FAMILY Vin Actual
PLATE
Y/N
LICENSE
#
AuctionV-15 1999 Retire FORIV TRAILER 4x4 4X4TSMX245C007152 N/A1414534 AuctionV-6 2006 Retire FORIV TRAILER 4x4 4X4TWDH266P19506913228151322815 AuctionV-13 2006 Retire FORIV TRAILER 4x4 4X4TSMH2061016524 N/A1344527 AuctionV-16 2005 Retire FLEETWOOD PEGAS 4CF2R292951500406N/A 1414533 AuctionV-4 2006 FORIV TRAILER 4x4 4X4TSMH206JO16524 13227741322774 Fleet #
Fixed
Asset # plate VIN
License
Plate
Manufacture
Year
Bus
Make
Bus
Model
Engine
Model
Year
Engine
Manufactur
er Engine Model
Engine
Family
Name
Displace
ment (L)
Fuel
Type
Useful
Life
Conditio
n
Low NOx
Certificate
Standard
(g/hp-hr)
Low NOx
Executive
Order
Number
Length
(ft.)
# of
Seats
GVWR
(lbs.)
Odometer
Reading
(mi.)
Odometer
Reading
Date
auction 6292 F15019 1VAGF3W28967048081290921 2009 Orion FXRB 2009 Cummins ISL G 9CEXH0540LBD8.9 CNG #REF! Good 0.02 A-021-0492 35 33 42,540 592,04211/01/2022 auction 6293 F15018 1VHGF3W2X967048091290923 2009 Orion FXRB 2009 Cummins ISL G 9CEXH0540LBD8.9 CNG #REF! Good 0.02 A-021-0492 35 33 42,540 599,18211/01/2022 auction 6260 F10198 1VHGF3L28667024891233418 2006 Orion ORV 2006 John DeerePOWERTECH 8.16JDXH08.10668.1 CNG #REF! Good 35 33 42,540 489,89005/31/2021 auction 6261 F10200 1VHGF3L24667024901233419 2006 Orion ORV 2006 John DeerePOWERTECH 8.16JDXH08.10668.1 CNG #REF! Good 35 33 42,540 227,58805/31/2021 auction 6262 F10202 1VHGF3L27667025021233420 2006 Orion ORV 2006 John DeerePOWERTECH 8.16JDXH08.10668.1 CNG #REF! Good 35 33 42,540 488,51906/23/2021 auction 6265 F10209 1VHGF3L28667025111233423 2006 Orion ORV 2006 John DeerePOWERTECH 8.16JDXH08.10668.1 CNG #REF! Good 35 33 42,540 208,51805/31/2021 auction 6266 F10211 1VHGF3L23667025141233424 2006 Orion ORV 2006 John DeerePOWERTECH 8.16JDXH08.10668.1 CNG #REF! Good 35 33 42,540 306,97905/31/2021 auction 1853 F10963 4UZAACB338CZ862221263939 2008 FreightlinerSTARTRANS2008 Cummins B GAS PLUS8CEXH0359BBG5.9 CNG #REF! Good 22 32 25,500 57,07005/31/2021 auction 1858 F10965 4UZAACB318CZ862211263938 2008 FreightlinerSTARTRANS2008 Cummins B GAS PLUS8CEXH0359BBG5.9 CNG #REF! Good 22 32 25,500 62,68305/31/2021 auction 1860 F10964 4UZAACB358CZ862231263940 2008 FreightlinerSTARTRANS2008 Cummins B GAS PLUS8CEXH0359BBG5.9 CNG #REF! Good 22 32 25,500 60,65205/31/2021 auction 6257 F07698 15GGB201041073181416227 2004 Gillig LOW FLOOR2004 DETROIT S50 4DDXH08.5FJG8.5 Diesel #REF! Good 35 31 39,500 460,46211/01/2022 auction 6258 F07699 15GGB201241073182416228 2004 Gillig LOW FLOOR2004 DETROIT S50 4DDXH08.5FJG8.5 Diesel #REF! Good 35 31 39,500 577,10911/01/2022 auction 6259 F07697 15GGB201441073183416229 2004 Gillig LOW FLOOR2004 DETROIT S50 4DDXH08.5FJG8.5 Diesel #REF! Good 35 31 39,500 489,62211/01/2022 auction 6277 F11621 1FD4E45S78DA185331320437 2008 StrarcraftAllstar 2008 Ford V10 8FMXE0265GAT6.8 CNG #REF! Good 23 18 22,000 159,71111/01/2022