December 21, 2020. Authorized the City Manager to award the construction contract for RFB 20-21- 21, Site Demolition and Clearing of the Oakes Basin in the amount of $178,760.
June 21, 2021. City Council adopted Resolution No. 2021-33 approving the application for grant funds from the Urban Flood Protection Grant Program. The grant application is for the Oakes Basin expansion project.
May 17, 2021. City Council authorized the filing of the Notice of Completion for RFB 20-21-21, Site Demolition and Clearing of the Oakes West Basin (north of Highway 198 and east of Road 152).
December 12, 2020. City Council awarded the construction contract for RFB 20-21-21, Site Demolition and Clearing of the Oaks West Basin (north of Highway 198 and east of Road 152) to ARES General Engineering of Prather, CA in the amount of $178,760.
May 6, 2019. City Council authorized the Notice of Completion for the removal of the orchard and vineyard on a 17 acre site located in the area of the future Tower Street (Rd 148) and the SR-198 interchange.
August 20, 2018. City Council authorized the City Manager to award a construction contract for RFB 17-18-78 to the lowest responsible bidder, HD Matthews Demolition & Excavation, Inc. in the amount of $109,000.00 for the removal of the orchard and vineyard on a 17-acre site located in the area of the future Tower Street and SR-198 Interchange.
January 1, 2014. Real property negotiations for the Peoples Basin, Oakes Basin, and the Goshen Basin.
November 21, 2013. City Council authorized the City Manager to execute a professional service agreement with Provost & Prichard Consulting Group for RFP 12-13-71, in the amount of $319,351 for Engineering Design and Regulatory Services to develop one new storm basin (Peoples Basin) and expand two other storm basins (Oakes and Goshen Basins). This project is primarily funded by a $4,615,174 grant from the California Department of Water Resources (DWR) as a Lower Kaweah River and Mill Creek Flood Control Improvements Project.
December 13, 2012. City Council authorized the City Manager to execute the Funding Agreement with the California Department of Water Resources for the $4,615,174 Flood Corridor Grant for the Lower Kaweah River and Mill Creek System Flood Control Improvement Projects.
February 22, 2011. City Council authorized the submission of an application for up to $5 million for a “Proposition 84 and 1E” California Department of Water Resources Flood Corridor Program Grant to develop storm runoff basins along the Lower Kaweah River, Mill Creek, and the City’s storm drain Visalia City Council Page 4 of 5 Printed on 3/26/2026
powered by Legistar™428
File #: 25-0730 Agenda Date: 4/6/2026 Agenda #: 10.
system. (Resolution 2011-05 required).
April 17, 2006. City Council authorized the execution of the agreement with Kaweah Delta Water Conservation District to divert storm water flows from Mill Creek into joint use basins.
Alternatives: None.
Recommended Motion (and Alternative Motions if expected):
I move to authorize the City Manager to award the construction contract for the Peoples Basin Project to Yanez Construction, Inc. in the amount of $2,020,025.00, transfer $170,000 within the Storm Sewer Deficiency fund (222) out of the Flood Layoff Feasibility Study project (CP0712) to the Peoples Basin Project (CP8334), and accept and appropriate an additional $730,000 grant funding from the State of California Department of Water Resources..
Environmental Assessment Status: The environmental assessment has been completed during the design process.
CEQA Review: Initial Study and Notice of Determination (NOD) for a Mitigated Negative Declaration (MND) No 2018-76.
Deadline for Action: 04/06/2026
Attachments:
1. Project Location Map.
2. RFB 25-26-28 Draft Construction Contract
3. Yanez Construction, Inc. Bid Proposal
4. Yanez Construction, Inc. Ownership Disclosure Form
Strategic Goal: Indicates which City Strategic Goal(s) this item supports. Check all that apply. ☐
Economic
Vitality
☐
Organizational
Excellence
☐
Fiscal
Strength
☒
Infrastructure &
Growth
☐
Quality of
Life
Visalia City Council Page 5 of 5 Printed on 3/26/2026
powered by Legistar™429
430
November 2025 RFB-25-26-28 29
Peoples Basin Pipeline Project
SECTION 4 CONTRACT
CONTRACT
CITY OF VISALIA
STATE OF CALIFORNIA
This Contract for the construction of the PEOPLES BASIN PIPELINE Project, is made between the City of Visalia, (hereinafter “the City”), and ___Yanez Construction, Inc. _, (hereinafter referred to as Contractor) both parties having authority to enter into this Contract do agree to the following:
ARTICLE I - For and in consideration of the payments hereinafter mentioned to be made by the City, and under the conditions expressed in this Contract and Contract Documents (as those terms are defined in City of Visalia Engineering Standard Specifications), including the bonds submitted with this Contract, Contractor agrees at his own cost and expense, to do all the work and furnish all the materials necessary to construct and complete in a good, workmanlike, and substantial manner, the PEOPLES BASIN PIPELINE Project, as a fully operational and functional facility for the intended purpose in accordance with the Contract Documents, and in accordance with the reference documents listed in the Contract Documents, which are also made a part hereof.
Said work to be done is shown upon the following plans:
RFB No.: 25-26-28
Project Name: PEOPLES BASIN PIPELINE PROJECT
Project No.: 3010-72000/CP8334-999
which said plans are hereby made a part of this contract.
ARTICLE II - Contractor agrees to receive and accept the following prices as full compensation for furnishing all materials and for doing all the work described in this Contract; also for all loss or damage arising out of the nature of the work aforesaid, or from the action of the elements, or from any unforeseen difficulties or obstructions which may arise or be encountered in the prosecution of the work until its acceptance by the City of Visalia and for all risks of every description connected with the work; also for all expenses incurred by or in consequence of the suspension or discontinuance of work and for well and faithfully completing the work, and the whole thereof, in the manner and according to the Contract Documents, and requirements of the Engineer under them, to wit:
431
November 2025 RFB-25-26-28 30
Peoples Basin Pipeline Project
432
November 2025 RFB-25-26-28 31
Peoples Basin Pipeline Project 433
November 2025 RFB-25-26-28 32
Peoples Basin Pipeline Project
ARTICLE III - Contractor hereby agrees to indemnify and hold City and its officers, agents, employees and assigns, harmless from any liability imposed for injury (as defined by Government code 810.8), whether arising before or after completion of work hereunder, or in any manner directly or indirectly caused, occasioned or contributed to, or claimed to be caused, occasioned or contributed to, in whole or in part, by reason of any act or omission, including strict liability or negligence of Contractor, or of anyone acting under Contractor's direction or control or on its behalf, in connection with or incident to or arising out of the performance of this contract.
It is the intent of the parties that Contractor will indemnify, defend, and hold harmless City and its officers, agents, employees, and assigns, from any and all claims, demands, costs, suits or actions as set forth above regardless of the existence of passive concurrent negligence, on the part of the City or anyone acting under its direction or control or on its behalf. It is further the intent of the parties that this indemnification required is not intended to relieve City from liability for the active negligence of City, its officers, agency and employees.
The Contractor shall continuously protect City property, including work under construction, from damage, loss, or liability of any kind to persons or property arising in connection with the contract, direct or indirect, including that arising from rainfall, flood waters, and other action of the elements and all acts of third parties.
This indemnity and hold harmless provision, insofar as it may be adjudged to be against public policy, shall be void and unenforceable only to the minimum extent necessary so that the remaining terms of this indemnity and hold harmless provision may be within public policy and enforceable.
In an emergency affecting the safety of life or limb, work site, or any property, the Contractor is hereby permitted and directed to act at their discretion to prevent such threatened loss of injury, and in the event any instructions are given by the City of Visalia in any emergency, the Contractor shall unconditionally comply therewith.
With respect to the performance of work under this agreement, the Contractor shall maintain and shall require all of its subcontractors to maintain insurance as described below.
Worker's Compensation insurance with statutory limits, and employer's liability insurance with limits of not less than $1,000,000 per accident.
Commercial General Liability insurance with a combined single limit of not less than $1,000,000 per occurrence. Such insurance shall include products/completed operations liability, owner's and Contractor's protective, blanket contractual liability, personal injury liability, broad form property damage coverage and explosion, collapse and underground hazard coverage. Such insurance shall (a) name City, its appointed 434
November 2025 RFB-25-26-28 33
Peoples Basin Pipeline Project
and elected officials, officers, employees and agents as insureds; and (b) be primary with respect to any insurance or self-insurance programs maintained by the City; and (c) contain Standard cross liability provisions. Such additional insured endorsement maintained by Contractor and its subcontractors shall not be required to provide coverage for City for the active negligence of City.
Commercial Automobile Liability insurance with a combined single limit of not less than $1,000,000 per occurrence. Such insurance shall include coverage for owned, hired and non-owned automobiles and shall be provided by a business automobile policy.
Contractor shall furnish properly executed certificates of insurance to City prior to commencement of work under this agreement, such certificates shall:
a. Clearly evidence all coverage required above, including specific evidence of a separate endorsement naming the City as an insured;
b. Indicate whether coverage provided is on a claims made or occurrence basis; and c. Provide that such insurance shall not be materially changed, terminated, or allowed to expire except on 30-days prior written notice to City’s Purchasing Division, Attention:
Purchasing
707 W. Acequia Avenue
Visalia, CA 93291.
Such insurance shall be maintained from the time work first commences until completion of the work under this Agreement if an occurrence policy form is used. If a claims made policy is used, coverage shall be maintained during the contract term and for a period extending 5 years beyond the contract date. Contractor shall replace such certificates for policies expiring prior to completion of work under this agreement and shall continue to furnish certificates 4 years beyond the contract term, when Contractor has a claims made form(s). If Contractor, for any reason, fails to maintain insurance coverage which is required pursuant to this agreement, the same shall be deemed a material breach of contract. City, at its sole option, may terminate this agreement and/or obtain damages from the Contractor resulting from said breach.
Alternatively, City may purchase such required insurance coverage, and without further notice to Contractor, City may deduct from sums due to Contractor any premium costs advanced by City for such insurance.
This insuring provision, insofar as it may be adjudged to be against public policy or in violation of Insurance Code Section 11580.04, shall be void and unenforceable only to the minimum extent necessary so that the remaining terms of the insuring provisions herein may be within public policy and enforceable. 435
November 2025 RFB-25-26-28 34
Peoples Basin Pipeline Project
ARTICLE IV - It is further expressly agreed by and between the City and the Contractor that should there be any conflict between the terms of this instrument and the bid or proposal of said Contractor, then this instrument shall control and nothing herein shall be considered as an acceptance of the said terms of said proposal conflicting with this instrument.
Executive Order N-6-22 – Russia Sanctions - On March 4, 2022, Governor Gavin Newsom issued Executive Order N-6-22 (the EO) regarding Economic Sanctions against Russia and Russian entities and individuals. “Economic Sanctions” refers to sanctions imposed by the U.S. government in response to Russia’s actions in Ukraine, as well as any sanctions imposed under state law. The EO directs state agencies to terminate contracts with, and to refrain from entering any new contracts with, individuals or entities that are determined to be a target of Economic Sanctions. Accordingly, should the State determine Contractor is a target of Economic Sanctions or is conducting prohibited transactions with sanctioned individuals or entities, that shall be grounds for termination of this agreement. The State shall provide Contractor advance written notice of such termination, allowing Contractor at least 30 calendar days to provide a written response. Termination shall be at the sole discretion of the State.
IN WITNESS WHEREOF, the parties have executed this agreement as of the date opposite their respective signatures.
CITY OF VISALIA
____________________________ _______
City Manager Date
CONTRACTOR
______________________________________
By: Authorized Agent Date
ATTEST:
____________________________ _______
Chief Deputy City Clerk Date
______________________________________
Print Name, Title
APPROVED AS TO FORM:
____________________________ _______
City Attorney Date
____________________________ _______
Risk Manager Date
____________________________ _______
Project Manager Date
436
November 2025 RFB-25-26-28 35
Peoples Basin Pipeline Project
SECTION 5 CONTRACT BOND FORMS
437
November 2025 RFB-25-26-28 36
Peoples Basin Pipeline Project
5-1 PAYMENT BOND
CITY OF VISALIA
PAYMENT BOND
(To Accompany Contract)
Bond No. ____________________
WHEREAS, the City of Visalia, has awarded to Contractor _____________________________________________ _________________________, hereafter designated as the “Principal”, a contract for the work described as follows:
____________________________________________________________________________________________, referred to hereafter as “Contract.”
AND WHEREAS, said Principal is required to furnish a bond in connection with said contract, to secure the payment of claims of laborers, mechanics, materialmen and other persons as provided by law.
NOW, THEREFORE, we the undersigned Principal and _____________________________________________, referred to as “Surety” are bound unto the City of Visalia in the sum of $___________________________________ ________________________________________________ dollars ($ ___________________________), for which payment, we bind ourselves, jointly and severally.
THE CONDITION OF THIS OBLIGATION IS SUCH, that if said Principal or its subcontractors shall fail to pay any of the persons named in Civil Code Section 9100, or amounts due under the California Unemployment Insurance Code with respect to work or labor performed by such claimant, or any amounts required to be deducted, withheld, and paid pursuant to the California Revenue and Taxation Code for the wages of employees of the Principal and his subcontractors, with respect to such work and labor, that the Surety herein will pay for the same in an amount not exceeding the sum specified in this bond, otherwise the above obligation shall be void. In case suit is brought upon this bond, the surety will pay a reasonable attorney’s fee to be fixed by the court.
This bond shall inure to the benefit of any of the persons, companies, or corporations, named in Civil Code Section 9100 as to give a right of action to such persons, entities, or their assigns in any suit brought upon this bond.
The Surety, for value received, hereby stipulates and agrees that no change, extension of time, alteration, or addition to the terms of the Contract or to the work to be performed under the Contract, or the specifications accompanying the Contract shall in any way affect its obligations on this bond, and Surety does hereby waive notice of any such change, extension of time, alteration, or addition to the terms of the Contract, or to the specified work, or the specifications. Surety hereby waives the provisions of Civil Code Sections 2819 and 2845.
IN WITNESS WHEREOF, We have hereunto executed this instrument on the date indicated below. Persons signing for a corporation or entity hereby represent that they are doing so pursuant to a grant of authority by the governing body.
_________________________________ _______ _________________________________ _______ Name of Principal Date Name of Surety Date
_________________________________ _________________________________ Signature for Principal Signature for Surety
_________________________________ _________________________________ Printed Name and Title Printed Name and Title
Correspondence or claims relating to this bond
should be sent to the surety at the following
address:
___________________________
___________________________
___________________________
438
November 2025 RFB-25-26-28 37
Peoples Basin Pipeline Project
CERTIFICATE OF ACKNOWLEDGEMENT
State of California
County of ________________________________________ SS
On ____________ ___________________ before me _________________________________________________, personally appeared ____________________________________________________________________________, who proved to me on the basis of satisfactory evidence to the be the person(s) whose name is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument.
I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct.
(SEAL) Notary Public
A notary public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document.
439
November 2025 RFB-25-26-28 38
Peoples Basin Pipeline Project
5-2 PERFORMANCE BOND
CITY OF VISALIA
PERFORMANCE BOND
(To Accompany Contract)
Bond No. ____________________
WHEREAS, the City of Visalia, has awarded to Contractor _____________________________________________ _________________________, hereafter designated as the “Principal”, a contract for the work described as follows:
_____________________________________________________________________________________________, referred to hereafter as “Contract.”
AND WHEREAS, said Principal is required to furnish a bond in connection with the above Contract, guaranteeing the faithful performance thereof:
NOW, THEREFORE, we the undersigned Principal and ______________________________________________, referred to as “Surety” are held firmly bound to the City of Visalia in the sum of $ ___________________________ _________________________________________________ dollars ($ ______________________________), to be paid to said City or its certain attorney, its successors and assigns: for which payment, well and truly to be made, we bind ourselves, our heirs, executors and administrators, successors or assigns, jointly and severally, firmly by these presents.
THE CONDITION OF THIS OBLIGATION IS SUCH, that if the above bound Principal, its heirs, executors, administrators, successors or assigns, shall in all things stand to and abide by and well and truly keep and perform the covenants, conditions, and agreements in the Contract and any alteration thereof, made as therein provided, on it or their part to be kept and performed within the time and in the manner therein specified, and in all respects according to their intent and meaning, and shall indemnify and save harmless the City of Visalia, its officers and agents, as therein stipulated, then this obligation shall become and be null and void; otherwise it shall be and remain in full force and virtue.
The said Surety, for value received, hereby stipulates and agrees that no change, extension of time, alteration, or addition to the terms of the Contract or to the work to be performed under the Contract, or the specifications accompanying the Contract shall in any way affect its obligations on this bond, and Surety does hereby waive notice of any such change, extension of time, alteration, or addition to the terms of the Contract, or to the specified work, or the specifications. Surety hereby waives the provisions of Civil Code Sections 2819 and 2845.
IN WITNESS WHEREOF, We have hereunto executed this instrument on the date indicated below. Persons signing for a corporation or entity hereby represent that they are doing so pursuant to a grant of authority by the governing body.
_________________________________ _______ _________________________________ _______ Name of Principal Date Name of Surety Date
_________________________________ _________________________________ Signature for Principal Signature for Surety
_________________________________ _________________________________ Printed Name and Title Printed Name and Title
Correspondence or claims relating to this bond
should be sent to the surety at the following
address:
___________________________
___________________________
___________________________
___________________________
NOTE: Signatures of those executing for the Surety must be properly acknowledged and Surety’s Power of Attorney must be attached.
440
November 2025 RFB-25-26-28 39
Peoples Basin Pipeline Project
CERTIFICATE OF ACKNOWLEDGEMENT
State of California
County of ________________________________________ SS
On ____________ ___________________ before me _________________________________________________, personally appeared ____________________________________________________________________________, who proved to me on the basis of satisfactory evidence to the be the person(s) whose name is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument.
I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct.
(SEAL) Notary Public
A notary public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document.
441
November 2025 RFB-25-26-28 40
Peoples Basin Pipeline Project
5-3 MAINTENANCE BOND
CITY OF VISALIA
MAINTENANCE BOND
(To Accompany Contract)
Bond No. ____________________
WHEREAS, The City of Visalia, has awarded to Contractor ____________________________________________ _________________________, hereafter designated as the “Principal”, a contract for the work described as follows:
_____________________________________________________________________________________________, referred to hereafter as “Contract.”
AND WHEREAS, said Principal is required to furnish a bond in connection with said contract, guaranteeing the correction of deficiencies during the specified maintenance period of one (1) year from the date the notice of completion for work performed under said contract has been recorded or the date the work was completed if no notice of completion is recorded:
NOW, THEREFORE, we the undersigned Principal and ______________________________________________, referred to as “Surety” are held firmly bound to the City of Visalia in the sum of $___________________________ __________________________________________________ dollars ($ _____________________________), to be paid to City of Visalia or its certain attorney, its successors and assigns: for which payment, well and truly to be made, we bind ourselves, our heirs, executors and administrators, successors or assigns, jointly and severally, firmly by these presents.
THE CONDITION OF THIS OBLIGATION IS SUCH, the named Principal has made specific guarantees to the City concerning the work, labor and materials furnished for the construction of said improvements as stated above.
If Principal complies with these guarantees for a period of one (1) year from the date of the notice of completion for work performed under said contract has been recorded or the date the work was completed if no notice of completion is recorded, then this obligation shall be null and void. If City notifies Surety that Principal has not met its guarantee, then Surety shall indemnify City for losses incurred up to the amount listed above. The City shall give written notice to the Principal during the one (1) year period specified in this obligation of any defect of the guaranteed work that becomes apparent. This obligation shall remain in full force and effect until any defect identified in said written notice are repaired by the Principal and accepted in writing by the City.
The said Surety, for value received, hereby stipulates and agrees that no change, alteration, or addition to the terms of the Contract or to the work to be performed under the Contract, or the specifications accompanying the Contract shall in any way affect its obligations on this bond, and Surety does hereby waive notice of any such change, alteration, or addition to the terms of the Contract, or to the specified work, or the specifications. Surety hereby waives the provisions of Civil Code Sections 2819 and 2845.
IN WITNESS WHEREOF, We have hereunto executed this instrument on the date indicated below. Persons signing for a corporation or entity hereby represent that they are doing so pursuant to a grant of authority by the governing body.
_________________________________ _______ _________________________________ _______ Name of Principal Date Name of Surety Date
_________________________________ _________________________________ Signature for Principal Signature for Surety
_________________________________ _________________________________ Printed Name and Title Printed Name and Title
442
November 2025 RFB-25-26-28 41
Peoples Basin Pipeline Project
Correspondence or claims relating to this bond
should be sent to the surety at the following
address:
___________________________
___________________________
___________________________
___________________________
NOTE: Signatures of those executing for the Surety must be properly acknowledged and Surety’s Power of Attorney must be attached.
443
444
445
446
447
Visalia City Council
Staff Report
Visalia City Council
707 W. Acequia
Visalia, CA 93291
File #: 25-0736 Agenda Date: 4/6/2026 Agenda #: 11.
Agenda Item Wording:
Approve revised resolution - Consider approval of revised Resolution No. 2026-08, per City Council adoption at the March 16, 2026 public hearing to uphold the appeal and overturn the Visalia Planning Commission's adoption of Condition of Approval No. 3, for Conditional Use Permit No. 2025 -32.
Agenda Date: 04/06/2026
Prepared by:
Colleen A. Moreno, Assistant Planner, [email protected], (559) 713-4031; Paul Bernal, Planning and Community Preservation Director, [email protected], (559) 713- 4025
Department Recommendation:
Staff recommends that the City Council adopt the revised Resolution No. 2026-08, which reflects the decision of the City Council to uphold the appeal and overturn Planning Commission’s Condition of Approval No. 3, which limited the hours of operation of the drive-thru use for Conditional Use Permit No. 2025-32. The attached revised resolution includes the Conditions of Approval as originally presented to the Planning Commission on February 9, 2026.
Summary:
The attached Resolution No. 2026-08 is revised to reflect the decision of the City Council to uphold the appeal of the applicant and overturn the Planning Commission’s adoption of Condition of Approval No. 3, which limited the hours of operation of the proposed drive-thru use to cease operations by 10:00 P.M. daily for Conditional Use Permit (CUP) No. 2025-32. The resolution included with the March 16, 2026 staff report was written for denial of the appeal, and upholding Planning Commission’s approval of the CUP subject to the drive thru lane only being allowed to operate until 10:00 P.M.
The City Council’s action to uphold the appeal and thus allow the drive-thru hours to operate as proposed by the applicant (Exhibit “A”), requires that a new resolution reflecting Council’s approval must be prepared. The revised resolution includes all applicable conditions of project approval based on the conditions for conditional use permits in the City of Visalia.
Background Discussion:
The City Council conducted a public hearing on March 16, 2026, regarding the appeal of Planning Commission’s adoption of Condition of Approval No. 3, which limited the hours of operation of the proposed drive-thru of Conditional Use Permit No. 2025-32 to close at 10:00 P.M. every night of the week.
On February 18, 2026, staff received an appeal of the Planning Commission’s approval of CUP No. 2025-32, subject to Condition of Approval No. 3. The appeal was filed by Javi Maldonado, the applicant of the conditional use permit. The reason for the appeal was due to the limitation of the Visalia City Council Page 1 of 2 Printed on 3/24/2026
powered by Legistar™448
File #: 25-0736 Agenda Date: 4/6/2026 Agenda #: 11.
applicant of the conditional use permit. The reason for the appeal was due to the limitation of the hours of operation for the drive-thru use. The appellant contended that limiting the hours of the drivethru lane would negatively impact the business and was not consistent with other surrounding drivethrus, such as the Jack in the Box on West Caldwell Avenue and South Court Street that operates 24 hours a day, 7 days a week.
The City Council, after receiving a staff presentation and public testimony, concluded that the limitation of hours was unnecessary based on the location of the project, existing ambient noise levels, and the existence of a block wall along the south property boundary of the existing residential uses to the north of the project site. Based on this, the City Council approved the motion to uphold the appeal and overturn Planning Commission’s adoption of Condition of Approval No. 3.
Fiscal Impact including annual maintenance and operating costs: None.
Prior Council Action:
At the March 16, 2026, City Council meeting, Council upheld the appeal of the applicant and overturned the Visalia Planning Commission’s adoption of Condition of Approval No. 3 for Conditional Use Permit No. 2025-32.
Alternatives: N/A
Recommended Motion (and Alternative Motions if expected):
I move to approve revised Resolution No. 2026-08, for Conditional Use Permit No. 2025-32.
Environmental Assessment Status: The project is Categorically Exempt under Section 15332 of the Guidelines for the Implementation of the California Environmental Quality Act (CEQA), Categorical Exemption No. 2025-58.
CEQA Review: The project is Categorically Exempt under Section 15332.
Deadline for Action: 04/06/2026
Attachments:
1. Revised Resolution No. 2026-08
2. Notice of Exemption No. 2025-58 for Conditional Use Permit No. 2025-32
3. Exhibit A - Operational Hours of Conditional Use Permit No. 2025-32
4. Aerial Map
Strategic Goal: Indicates which City Strategic Goal(s) this item supports. Check all that apply. ☒
Economic
Vitality
☐
Organizational
Excellence
☐
Fiscal
Strength
☒
Infrastructure &
Growth
☐
Quality of
Life
Visalia City Council Page 2 of 2 Printed on 3/24/2026
powered by Legistar™449
Resolution No. 2026-08
RESOLUTION NO. 2026-08
A RESOLUTION OF THE CITY COUNCIL OF THE
CITY OF VISALIA APPROVING THE APPEAL AND OVERTURNING THE PLANNING COMMISSION’S ADOPTION OF CONDITION OF APPROVAL NO. 3, MODIFYING
THE HOURS OF OPERATION OF THE DRIVE-THRU OF CONDITIONAL USE PERMIT NO. 2025-32, A REQUEST TO CONSTRUCT A 4,130 SQUARE FOOT BUILDING WITH A DRIVE-THRU WITHIN 250-FEET OF RESIDENTIAL WITHIN SUBAREA “A” OF THE CALDWELL 51 SPECIFIC PLAN. THE SITE IS LOCATED AT
THE SOUTHEAST CORNER OF WEST CALDWELL AVENUE AND SOUTH
STONEBROOK STREET IN THE C-R (REGIONAL COMMERCIAL) ZONE (APN: 122-390-002).
WHEREAS, Conditional Use Permit No. 2025-32 is a request to construct a 4,130 square foot building with a drive-thru lane within 250-feet of residential uses to the north within subarea “A” of the Caldwell 51 Specific Plan. The site is located at the southeast corner of West Caldwell Avenue and South Stonebrook Street in the C-R (Regional Commercial) zone (APN: 122-390-002); and
WHEREAS, the Planning Commission of the City of Visalia, after duly published notice, did hold a public hearing before said Commission on February 9, 2026, and concluded said hearing on that date; and
WHEREAS, the Planning Commission of the City of Visalia approved Conditional Use Permit No. 2025-32 with the modified condition, Condition of Approval No. 3, which limits the hours of operation for the drive-thru to 10:00 P.M. every night of the week; and
WHEREAS, the Planning Commission of the City of Visalia finds the Conditional Use Permit with the modification to the Conditions of Approval, to be in accordance with Section 17.38.110 of the Zoning Ordinance of the City of Visalia based on the evidence contained in the staff report and testimony presented at the public hearing; and WHEREAS, an appeal of the Planning Commission’s modified Conditions of Approval for Conditional Use Permit No. 2025-32, was received on February 18, 2026; and
WHEREAS, the City Council of the City of Visalia, after ten (10) days published notice held a public hearing before said Council on March 16, 2026; and WHEREAS, the City Council after receiving a staff presentation and public comment, finds the approval of Conditional Use Permit No. 2025-32, with the requested hours of operation by the applicant, was made in accordance with Chapter 17.38 (Conditional Use Permits) of the City of Visalia, based on evidence contained in the staff report and testimony presented at the public hearing; and WHEREAS, the City Council finds the project to be Categorically Exempt consistent with the California Environmental Quality Act (CEQA) and City of Visalia Environmental Guidelines, pursuant to CEQA Section 15332; and 450
Resolution No. 2026-08
NOW, THEREFORE BE IT FURTHER RESOLVED that the City Council of the City of Visalia makes the following specific findings based on the evidence presented:
1. That the proposed use and proposed hours of operation by the applicant is consistent with the policies and intent of the General Plan and Zoning Ordinance.
The City Council concluded the proposed operating hours as requested by the applicant of the drive-thru will not have a direct impact to the neighboring residential uses in the existing neighborhoods that are adjacent or nearby the project site and would therefore not be materially injurious to properties or improvements in the vicinity.
BE IT FURTHER RESOLVED that the City Council upholds the appeal, and approves the Conditional Use Permit No. 2025-32, with the operating hours as proposed by the applicant, on the real property here in above described in accordance with the terms of this resolution, and subject to the following conditions:
1. That the Conditional Use Permit shall be developed consistent with the comments and conditions of Site Plan Review No. 2025-112, incorporated herein by reference.
2. That the use shall be operated in substantial compliance with the site plan, floor plan, and operational statement, in Exhibits “A”, “B”, “C”, “D”, and “E” of the Planning Commission staff report dated February 9, 2026. Any changes or intensification of the use are subject to review by the City Planner and may subsequently be required to be reviewed by the Planning Commission.
3. That the project comply with the Caldwell 51 Specific Plan.
4. That no significant direct or indirect light or glare may fall upon adjacent residential uses.
5. That the use would be subject to the City of Visalia Noise Ordinance and that the noise emailed from the drive-thru teller speaker box shall meet all community noise standards as identified in the City’s Noise Ordinance Chapter 8.36
6. All new building signage shall require a separate building permit and shall be designated consistent with the Sign Ordinance of the City of Visalia Municipal Code Chapter 17.48 and the Caldwell 51 Specific Plan.
7. That all other federal, state and city laws, codes and ordinances be complied with. 451
Environmental Document # 2025-58
NOTICE OF EXEMPTION
City of Visalia
315 E. Acequia Ave.
Visalia, CA 93291
To: County Clerk
County of Tulare
County Civic Center
Visalia, CA 93291-4593
Conditional Use Permit No. 2025-32
PROJECT TITLE
Southeast corner of W Caldwell Ave and S Stonebrook St. (APN: 122-392-002)
PROJECT LOCATION
Visalia Tulare
PROJECT LOCATION - CITY COUNTY
A request to construct a drive-thru restaurant and a second restaurant tenant space within the Caldwell Area 51 Specific Plan.
DESCRIPTION - Nature, Purpose, & Beneficiaries of Project City of Visalia, 315 E. Acequia Avenue, Visalia, CA 93291, [email protected]
NAME OF PUBLIC AGENCY APPROVING PROJECT
BJ Perch, Perch Construction Inc., 7034 Pershing Ave., Suite A Visalia CA 93291
NAME AND ADDRESS OF APPLICANT CARRYING OUT PROJECT
Same as above
NAME AND ADDRESS OF AGENT CARRYING OUT PROJECT
EXEMPT STATUS: (Check one)
Ministerial - Section 15073
Emergency Project - Section 15071
Categorical Exemption - Section 15332
Statutory Exemptions- State code number:
Infill development project on site of no more than five acres
REASON FOR PROJECT EXEMPTION
Colleen Moreno, Assistant Planner (559) 713-4031
CONTACT PERSON AREA CODE/PHONE
January 20, 2026
DATE Brandon Smith
ENVIRONMENTAL COORDINATOR
452
Friday, September 26, 2025 1:21:06 PM - IMG_4789.jpg
453
Aerial Map
Stonebrook
Lincoln
W Caldwell Ave
S Stonebrook St
W Caldwell Ave
PACKWOOD
Vicinity Map
Ben
Maddox
Riggin
Houston
Ma Mineral King in
Walnut
Goshen
St
Jo h ns
DemareeNoble Mooney
Akers Hwy 99
Lovers Lane
Pla
za
Shirk
Betty
Hwy 198
.
Project Site
0 0.01 0.02 0.04 Miles
454
Visalia City Council
Staff Report
Visalia City Council
707 W. Acequia
Visalia, CA 93291
File #: 25-0737 Agenda Date: 4/6/2026 Agenda #: 12.
Agenda Item Wording:
Award a construction contract for the fiscal year 2025-26 Cape Seal Project - Authorize the City Manager to award a contract to VSS International in the amount $1,573,325 for the construction of the fiscal year 2025-26 cape seal project.
Agenda Date: 04/06/2026
Prepared by:
Danny Galindo, Public Works Manager, [email protected] , 713-4186 Nick Bartsch, Public Works Director, [email protected] ,713-4052 Department Recommendation: Staff recommends that the City Council authorize the City Manager to award a contract to VSS International, Inc. in the amount $1,573,325 for the construction of the fiscal year 2025-26 cape seal project (CIP 1410-72000/CP0247-999).
Summary:
RFB 25-26-33 for the fiscal year 2025-26 Cape Seal Project (CIP 1410-72000/CP0247-999) was advertised in the newspaper on January 23, 2026, posted on Bidnet, and notifications were sent to contractors who provide this service. On February 26, 2026, City staff opened (5) bids that were submitted for the project. The results are summarized below and are listed in the order from lowest to highest bid.
No. Contractor Location Bid
1 VSS International, Inc. West Sacramento, Ca $1,573,325 2 American Pavement Systems Modesto, Ca $1,690,556.34
3 Dryco Construction Freemont, Ca $1,726,726
4 Pavement Co. Sacramento, Ca $1,790,303.41
5 Dolittle Construction Snoquaimie, Wa $1,866,999.99
VSS International submitted the lowest bid. Through review of their submitted bid documents, it was determined they were the most responsive and responsible bidder. VSS International completed Visalia’s FY 23-24 and FY 24-25 Cape Seal Projects successfully, and on time. Public Works staff and the Public Works Inspector commented that VSS International previously performed quality work in a timely manner with excellent communication.
Background Discussion:
This project includes the application of cape seal to various streets identified in the City’s pavement management program. The work will be focused on specific streets throughout the City as shown in the attached map.
To increase the longevity of the pavement surface, it is necessary for the City to maintain the pavement of the streets properly and promptly. Applying cape seal treatments at this life-stage of the Visalia City Council Page 1 of 3 Printed on 3/30/2026
powered by Legistar™455
File #: 25-0737 Agenda Date: 4/6/2026 Agenda #: 12.
pavement of the streets properly and promptly. Applying cape seal treatments at this life-stage of the streets is beneficial as it extends the pavement life at a relatively inexpensive price. As streets deteriorate further, without this preventive maintenance, future maintenance becomes more expensive and time consuming.
The cape seal maintenance treatment must be performed with consideration to the public. Public outreach is required to notify the residents in the work zone and to provide expectations on the extents of traffic control to be performed. Cape seal consists of an application of a chip seal followed by a microsurfacing application onto the selected roadways. The chip seal consists of applying an asphalt-rubber seal binder combined with a heated application of aggregate cover material. After the chip seal has cured, the microsurfacing application is applied. This secondary application consists of a mixture of aggregate, emulsified asphalt, mineral filler, and other additives that creates a new drivable surface over the chip seal.
Prior to the chip seal process, the streets will be swept and prepared as necessary. The contractor will be required to provide access during the treatment process. The chip seal portion can be performed relatively quickly, 1-2 days depending on area, and provides a semi-finished surface which is typically opened within 24 hours following the treatment. Once the chip seal has cured, the roadway will be opened for 1-2 weeks until the microsurfacing is applied. During this time, the street will be swept again to remove excess aggregates left behind from the chip seal. Once the microsurfacing has been applied and been allowed to fully cure, the roadway is opened back up to the public within 24 hours typically. “No Parking” signs will be posted and flyers will be handed out to residents and businesses three (3) working days prior to beginning the cape seal work in the affected areas.
This project is funded solely using Measure N funds. The residents of Visalia passed Measure ‘N’ in November of 2016 to increase the City’s ability to perform street maintenance as one of its primary objectives (CP0247).
Fiscal Impact including annual maintenance and operating costs:
The Measure N Cape Seal Project for FY 2025-26 (CIP 1410-72000/CP0247-999) has a current budget of $1,901,089.
Budget Summary FY 2025-26 Cape Seal Project, CP0247
Project Budget $1,901,089
Estimated Project Cost:
Construction Cost $1,573,325
Construction Contingency (10%) $157,332
Construction Management (2%) $31,467
Construction Inspection (3%) $47,200
Geotechnical Testing (1.5%) $23,600
Total Project Cost $1,832,924
Estimated Project Budget Surplus $68,165
Visalia City Council Page 2 of 3 Printed on 3/30/2026
powered by Legistar™456
File #: 25-0737 Agenda Date: 4/6/2026 Agenda #: 12.
Unexpended funds following completion of the project will be returned to the fund source from which they were originated.
Prior Council Action:
- May 19, 2025 - City Council awarded the construction contract for FY 24-25 Cape Seal Project to VSS International, Inc.
- October 6, 2025 City Council authorized the City Manager to file a Notice of Completion for the construction of the FY 24-25 Cape Seal Project
Alternatives: None recommended
Recommended Motion (and Alternative Motions if expected):
I motion to authorize the City Manager to award a contract to VSS International, Inc. in the amount $1,573,325 for the construction of the fiscal year 2025-26 cape seal project.
Environmental Assessment Status: N/A
CEQA Review: N/A
Deadline for Action: 04/06/2026
Attachments:
VSS International Bid
Summary of Bids
RFB 25-26-33
Cape Seal Layout
Levine Act
Strategic Goal: Indicates which City Strategic Goal(s) this item supports. Check all that apply. ☐
Economic
Vitality
☐
Organizational
Excellence
☐
Fiscal
Strength
☒
Infrastructure &
Growth
☐
Quality of
Life
Visalia City Council Page 3 of 3 Printed on 3/30/2026
powered by Legistar™457
458
459
460
461
462
463
464
465
466
467
468
469
470
471
472
473
474
475
476
477
478
479
480
481
482
483
484
485
486
487
488
489
490
491
492
493
494
495
496
497
498
499
500
501
502
503
504
505
506
507
508
509
510
511
512
513
514
515
516
517
518
519
520
521
522
523
524
525
526
527
528
529
530
531
532
533
534
535
536
CITY OF VISALIA, CALIFORNIA
PUBLIC WORKS DEPARTMENT
STREETS DIVISION
CONSTRUCTION SPECIFICATIONS
FOR CONSTRUCTION ON
REQUEST FOR BID (RFB) NO. 25-26-33
FY 25-26 CAPE SEAL PROJECT
Bid Submittal Deadline: 2:00 P.M. on Thursday, February 26, 2026 PROJECT NO. 1410-72000/CP0247-999
Dated: January 2026
537
RFB 25-26-33, FY 25-26 CAPE SEAL PROJECT
i
TABLE OF CONTENTS Page No.
NOTICE TO CONTRACTORS................................................................................................................1 BID PROPOSAL.........................................................................................................................................4 SUBCONTRACTORS LIST....................................................................................................................20 CONTRACTOR’S REFERENCE FORM .............................................................................................22 SUBMIT WITH BID ................................................................................................................................24 BIDDERS BOND ......................................................................................................................................24 CONTRACT..............................................................................................................................................26 CONTRACT BOND FORMS..................................................................................................................31 CONTRACTOR’S FINAL PAYMENT AFFIDAVIT ..........................................................................39 STANDARD SPECIFICATIONS ...........................................................................................................40 SPECIAL PROVISIONS SECTIONS 60-80..........................................................................................41 SECTION 60 JOB SPECIFIC PROVISIONS ...................................................................................41 60-1 Bid Proposal...........................................................................................................................41 60-2 Subcontracting .......................................................................................................................42 60-3 Prevailing Wages ...................................................................................................................42 60-4 Beginning of Work.................................................................................................................42 60-5 Work Hours............................................................................................................................43 60-6 Liquidated Damages ..............................................................................................................43 60-7 Project Size ............................................................................................................................43 60-8 Construction Surveying/Staking ............................................................................................43 60-9 Traffic Detours.......................................................................................................................43 60-10 Location to Salvage Items......................................................................................................43 60-11 Storage of Materials...............................................................................................................43 60-12 Coordination of Work ............................................................................................................44 60-13 Utility Coordination ...............................................................................................................44 60-14 Meetings.................................................................................................................................45 60-15 Environmental Mitigation & Requirements...........................................................................45 60-16 Payment for Items Not Covered by Specific Bid Items.........................................................45 60-17 Standard Specification Amendments.....................................................................................45 60-18 Copies of Plans and Construction Specifications...................................................................45 60-19 Department of Industrial Relations Requirements, Public Works Contractor Registration Program and Project Labor Agreements................................................................................46 SECTION 61 GENERAL REQUIREMENTS...................................................................................47 61-1 General description of the work.............................................................................................47 61-2 Preconstruction conference ....................................................................................................47 61-3 Location of work....................................................................................................................47 61-4 Qualifications of the contractor..............................................................................................47 61-5 Construction schedule and order of work ..............................................................................47 61-6 Cooperation with others.........................................................................................................47 61-7 Materials submittals...............................................................................................................48 61-8 Project site maintenance.........................................................................................................48 61-9 Water for construction ...........................................................................................................49 61-10 Testing during construction....................................................................................................49 538
RFB 25-26-33, FY 25-26 CAPE SEAL PROJECT
ii
61-11 Certificates of compliance......................................................................................................49 61-12 Contractor's investigation of jobsite.......................................................................................49 61-13 Signs.......................................................................................................................................49 61-14 Field office .............................................................................................................................49 61-15 Temporary services................................................................................................................49 61-16 Special security requirements ................................................................................................50 61-17 Disposition of equipment and materials.................................................................................50 SECTION 62 MOBILIZATION..........................................................................................................50 62-1 General...................................................................................................................................50 SECTION 63 PERMITS ......................................................................................................................50 SECTION 64 MAINTENANCE AND CONTROL OF TRAFFIC..................................................51 64-1 General...................................................................................................................................51 64-2 Related Information ...............................................................................................................51 64-3 Materials and Methods...........................................................................................................51 64-4 Parking & Notifications & Portable Changeable Message Sign (PCMS) Requirements ......51 64-5 Traffic Control .......................................................................................................................54 64-6 Measurement and Payment ....................................................................................................55 SECTION 65 CAPE SEAL ..................................................................................................................55 65-1 General Description of the Work ...........................................................................................55 65-2 Pre-Qualification....................................................................................................................55 SECTION 66 CHIP SEAL CONSTRUCTION METHOD ..............................................................55 66-1 General...................................................................................................................................55 66-2 Surface Preparation ................................................................................................................56 66-3 Asphalt-Rubber Binder ..........................................................................................................56 66-4 Aggregate Cover Material (screenings) .................................................................................63 66-5 Traffic.....................................................................................................................................66 66-6 Payment..................................................................................................................................66 SECTION 67 MICRO-SURFACING .................................................................................................67 67-1 General...................................................................................................................................67 67-2 Surface Preparation ................................................................................................................67 67-3 Micro-Surfacing Material.......................................................................................................67 67-4 Micro Surfacing Mix Design ...............................................................................................69 67-5 SpreadingEquipment.............................................................................................................70 67-6 Application.............................................................................................................................71 67-7 Curing ....................................................................................................................................71 67-8 Traffic....................................................................................................................................71 67-9 Clean Up ................................................................................................................................71 67-10 Payment..................................................................................................................................71 SECTION 68 SIGNAGE, STRIPING AND PAVEMENT MARKINGS ........................................72 68-1 Painted Traffic Stripes & Pavement Markings ......................................................................72 68-2 Painted Traffic Stripes & Pavement Markings ......................................................................73 SECTION 69 RAISED PAVEMENT MARKERS ............................................................................73 69-1 General...................................................................................................................................73 69-2 Measurement and Payment ....................................................................................................73 SECTION 80 DESCRIPTION OF BID ITEMS ................................................................................75 539
RFB 25-26-33, FY 25-26 CAPE SEAL PROJECT
iii
STATE FUNDING REQUIREMENTS..................................................................................................77 80-1 State Funding Requirements..................................................................................................77 APPENDIX A – City of Visalia Labor Compliance Manual
APPENDIX B – State Prevailing Wages
APPENDIX C – Cape Seal Map
APPENDIX D – Cape Seal List
Additional Attachments:
City of Visalia Engineering Standards
City of Visalia Engineering Standard Amendments
City of Visalia Encroachment Permit Policy
540
RFB 25-26-33, FY 25-26 CAPE SEAL PROJECT
1 CITY OF VISALIA, CA
NOTICE TO CONTRACTORS
SEALED BIDS will be received at the office of the Purchasing Division, City Hall West, 707 W. Acequia, Visalia, California 93291, until 2:00 p.m. on Thursday, February 26, 2026, for furnishing materials, supplies, equipment and labor for performing the work as specified in the approved Plans, the Standard Specifications, the Construction Specifications and other Contract Documents for the following project:
Project Name: FY 25-26 CAPE SEAL
Project No.: 1410-72000/CP0247-999
RFB No.: 25-26-33
Bids are required for the entire work, complete and in place. Bids may be shipped or delivered as specified in Section 60, Special Provisions.
TIME OF COMPLETION: 55 working days
NON-MANDATORY PRE-BID MEETING: There will be a non-mandatory Pre-Bid meeting on Monday, February 9, 2026 beginning at 10:00am in the Council Chambers at City Hall, 707 W.
Acequia Avenue, Visalia, CA 93291. Attendance at this meeting is not required to submit a bid for this project however it is recommended as project details will be discussed.
QUESTIONS: Direct questions regarding this Project to the Purchasing Department by email:
[email protected]. Questions must be received by Tuesday, February 17, 2026.
PROJECT BUDGET: The City of Visalia does not provide an Engineer’s Estimate however the total approved Project Budget for the FY 25-26 CAPE SEAL project as was approved in the City’s Capital Improvement Program for this project is approximately $1,175,000.00. The total approved Project Budget is an estimate of the total project delivery costs which includes but is not limited to construction, engineering design, construction support, city project management and administrative costs.
TO OBTAIN SPECIFICATIONS AND BID DOCUMENTS: Plans, forms of proposals, bonds, and other contract documents may be requested from the office of the Purchasing Division, 707 W. Acequia, Visalia, California 93291, by telephone (559) 713-4334, or by email: [email protected]. If documents do not exceed our email capacity, they will be emailed to the requestor. Otherwise, a sharefile link will be provided to the requestor to download the plans/specifications. A copy of the plans and bidding documents are also available at various builders’ exchanges or can be downloaded by registered users of BidNetDirect.
No bid will be considered unless it is made on the specified proposal form furnished by the City of Visalia.
The following documents must be completed and submitted with the bid (pages 4-25) of this RFB document):
Bid Proposal & Acknowledgement of Addenda
Public Contract Code Questionnaire/Statement
Equal Employment Opportunity Compliance Certificate
Clean Air and Water Pollution Control Certificate
Non-Collusion Affidavit
Workers Compensation Compliance Certificate
Drug Free Workplace Certification
Disclosures
Certification of Anti-Kickback Compliance
Americans With Disabilities Act Compliance Certificate 541
RFB 25-26-33, FY 25-26 CAPE SEAL PROJECT
2 Certificate of Non-Segregated Facilities
Debarment and Suspension Certification
Iran Contracting Act Certification
Bid Proposal Contract
Subcontractors List
Contractor’s Reference Form
Bidders Bond/Bid Security
All addenda issued during the bidding process must be signed and submitted with the bid document.
BIDDER’s Bond: Each bid must be accompanied by cash, cashier's check, certified check, or bidder's bond made payable to the City of Visalia for an amount equal to at least ten percent (10%) of the amount of bid, such guaranty to be forfeited should the bidder to whom the contract is awarded fail to enter into the contract.
Depending on the nature of the project, other documents may be included by the City and shall be completed in all respects and submitted by the bidder with the bid or as otherwise indicated by the City.
All bids are to be compared on the basis of the Engineer’s estimate of the quantities of work to be done as shown in the bid proposal form. No bid will be accepted from a Contractor who has not been licensed in accordance with provisions of Chapter 9 of Division 3 of the State of California Business and Professions Code. This project requires the Contractor to have a Class A or combination of Class C licenses to perform all aspects of work.
All Contractors and/or subcontractors shall be required to obtain a City of Visalia Business Tax Certificate.
No payment will be made to any Contractor until such license is obtained.
PUBLIC WORKS PROJECT: Bidders/Contractors must be registered with the State of California Department of Industrial Relations in compliance with SB854 which states: A contractor or subcontractor shall not be qualified to bid on, be listed in a bid proposal, subject to the requirements of Section 4104 of the Public Contract Code, or engage in the performance of any contract for public work, as defined in this chapter, unless currently registered and qualified to perform public work pursuant to Section 1725.5.
Awarded Contractor will be required to furnish electronic payroll records for project to the Labor Commissioner
Per California Labor Code, the following statements are hereby incorporated into RFB-25-26-33 As set forth in CLC section 1771.1(a), all contractors and subcontractors must be currently registered and qualified to perform public work pursuant to CLC section 1725.5 to be qualified to bid, be listed in a bid proposal, or perform any public work for the COV. Proof of registration for each contractor and subcontractor listed on the bid is required.
As set forth in CLC section 1771.4(a)(1), notice is given that this project is a public works project, subject to compliance monitoring and enforcement by the Department of Industrial Relations.
As set forth in CLC section 1773, the COV shall obtain the general prevailing rate per diem wages and the general prevailing rate for holiday and overtime work in the locality in which the public work is to be performed for each craft, classification, or type of worker needed to execute the contract from the Director of Industrial Relations. In accordance with labor code section 1773.2, this information is to be included in the bid specifications and in the contract itself.
This project will be subject to all applicable State Wage Determinations. The Contractor will be responsible for paying wages from the State Wage Determinations for all trades. The wages are set forth in the General Prevailing Wage Rates for this project, available at City of Visalia address and available from the California Department of Industrial Relations’ Internet web site: http://www.dir.ca.gov/dlsr/PWD/index.htm. 542
RFB 25-26-33, FY 25-26 CAPE SEAL PROJECT
3 In accordance with the provisions of Section 1770 of the Labor Code, the Director of the Department of Industrial Relations of the State of California has ascertained the general prevailing rate of wage: and employer payments for health and welfare, pension, vacation, travel time and subsistence pay as provided in Section 1773.8, apprenticeship or other training programs authorized by Section 3093, and similar purposes applicable to the work to be done. These rates shall be a part of the Contract and are on file in the office of the City Engineer and will be made available to any interested person on request. The Contractor must ensure that employees and applicants for employment are not discriminated against because of their race, color, religion, sex or national origin.
Pursuant to Section 22300 of the California Public Contract Code (Section 10263 of the Public Contract Code for State Agencies), the Contractor may substitute securities for any money held by the Owner to insure performance of the contract. At the request and expense of the Contractor, securities equivalent to the amount withheld shall be deposited with the Owner or with a State or federally chartered banks as an escrow agent, who shall return such securities to the Contractor upon satisfactory completion of the contract. Deposit of securities with an escrow agent shall be subject to written agreement in accordance with the provisions of Section 22300. The Owner shall not certify that the contract has been completed until at least 30 days after filing by the Owner of a Notice of Completion. Securities eligible for investment under this Section shall be limited to those listed in Section 16430 of the California Government Code, bank or savings and loan certificates of deposit, interest bearing demand deposit accounts, standby letters of credit, or any other security mutually agreed upon by the Contractor and the public agency.
Executive Order N-6-22 – Russia Sanctions On March 4, 2022, Governor Gavin Newsom issued Executive Order N-6-22 (the EO) regarding Economic Sanctions against Russia and Russian entities and individuals. “Economic Sanctions” refers to sanctions imposed by the U.S. government in response to Russia’s actions in Ukraine, as well as any sanctions imposed under state law. By submitting a bid or proposal, Contractor represents that it is not a target of Economic Sanctions. Should the State determine Contractor is a target of Economic Sanctions or is conducting prohibited transactions with sanctioned individuals or entities, that shall be grounds for rejection of the Contractor’s bid/proposal any time prior to contract execution, or, if determined after contract execution, shall be grounds for termination by the State.
THE CITY HEREBY AFFIRMATIVELY ENSURES that Minority Business Enterprises and Disadvantaged Business Enterprises (DBE) will be afforded full opportunity to submit proposals in response to this notice. Individuals and/or entities submitting bids/proposals to the City of Visalia will not be discriminated against on the basis of race, religious creed, color, national origin, ancestry, physical or mental disability, medical condition, genetic information, marital status, gender, gender identity or expression, age, sexual orientation, or military and veteran status in any consideration leading to the award of contract.
The City of Visalia reserves the right to reject any or all bids.
CITY OF VISALIA
Danny Galindo, Project Manager
543
RFB 25-26-33, FY 25-26 CAPE SEAL PROJECT
4 BID PROPOSAL
FROM: CONTRACTOR
Company Name of Bidder
Bids are required for the entire work complete and in place. Contractor must fill out all portions of Bid Proposal Form, including the Schedule for Base Bid and Additive Bid Schedule (if any).
For improvement of:
RFB No.: 25-26-33
Project Name: FY 25-26 CAPE SEAL
Project No.: 1410-72000/CP0247-999
To the City Clerk of the City of Visalia:
The undersigned as bidder declares that he has carefully examined the location of the proposed work, that he has examined the plans and specifications, and read the accompanying instructions to bidders, and hereby proposes and agrees, if this proposal is accepted, to furnish all materials and do all the work required to complete said work in accordance with said Plans, if any, Standard Specifications, Construction Specifications and Contract Documents in the time and manner therein prescribed, for the unit price or lump sum price set forth in the following Bid Schedule:
FY 25/26 CAPE SEAL BID PROJECT
ITEM DESCRIPTION OF WORK QUANTITY UNIT
UNIT
PRICE TOTAL
NO. ($) ($)
1 Mobilization & Demobilization 1 LS
2 Traffic Control 1 LS
3 Measure N Signage 1 LS
4 Asphalt Rubber Chip Seal
(3/8" Grading) 227,085.59 SY
5 Micro-Surfacing (Type II) 227,085.59 SY
6 Striping and Pavement Markings 1 LS
7 Raised Pavement Markers
(Approx. 9 Blue RPMs) 1 LS
TOTAL BID AMOUNT ($) = _____________
All bids are checked for accuracy. In case of a discrepancy between unit price and total, the unit price shall prevail.
The LOWEST BIDDER will be determined on the LOWEST TOTAL BID AMOUNT.
The award of the Contract, if it is awarded, will be to the lowest responsive, responsible bidder whose proposal complies with all the requirements prescribe herein. 544
RFB 25-26-33, FY 25-26 CAPE SEAL PROJECT
5 If this proposal shall be accepted and the undersigned shall fail to contract as aforesaid and to deliver the payment, performance, and maintenance bonds in the sums to be determined as aforesaid, with surety satisfactory to the City of Visalia, and to deliver all required insurance policies within ten (10) days, not including Sundays and legal holidays, after the bidder has received notice that the contract has been awarded, the City Council may, at its option, determine that the bidder has abandoned the Contract, and thereupon this proposal and the acceptance thereof shall be null and void, and the forfeiture of such security accompanying this proposal shall operate and the same shall be the property of the City of Visalia.
Bidder acknowledges receipt of the following addenda:
No. , dated , 20___
No. , dated , 20___
No. , dated , 20___
No. , dated , 20___
No. , dated , 20___
No. , dated , 20___
545
RFB 25-26-33, FY 25-26 CAPE SEAL PROJECT
6 SUBMIT WITH BID
PUBLIC CONTRACT CODE SECTION 10162 QUESTIONNAIRE
In accordance with Public Contract Code Section 10162, the Bidder hereby completes, under penalty of perjury, the following questionnaire:
Has the bidder, or any office of the bidder, or any employee who has a proprietary interest in the bidder, ever been disqualified, removed, or otherwise prevented from bidding on, or completing a federal, state, or local government project because of a violation of law or a safety regulation? Yes______ No______
If the answer is yes, explain the circumstances in the following space:
PUBLIC CONTRACT CODE SECTION 10232 STATEMENT
In accordance with Public Contract Code Section 10232, the Contractor, hereby states under penalty of perjury, that no more than one final unappealable finding of contempt of court by a federal court has been issued against the Contractor within the immediately preceding two-year period because of the Contractor’s failure to comply with an order of a federal court which orders the Contractor to comply with an order of the National Labor Relations Board.
Note: The above Questionnaire and Statement are a part of the Proposal. Signing this Proposal on the signature portion thereof shall also constitute signature, under penalty of perjury, of this Questionnaire and Statement.
Bidders are cautioned that making a false certification may subject the certifier to criminal prosecution.
SUBMIT WITH BID
546
RFB 25-26-33, FY 25-26 CAPE SEAL PROJECT
7 EQUAL EMPLOYMENT OPPORTUNITY COMPLIANCE CERTIFICATE
(EXECUTIVE ORDER 11246)
Equal Opportunity Clause
Unless exempted by rules, regulations or orders of the Secretary of Labor issued pursuant to Executive Orders 10925, 11114 or Section 204 of Executive Order 11246 of September 24, 1965, during the performance of each contract with the City of Visalia, the BIDDER agrees as follows:
1. The BIDDER will not discriminate against any employee or applicant for employment because of race, color, religion, gender, national origin or political affiliation. The BIDDER will take affirmative action to ensure that applicants are employed, and that employees are treated during employment, without regard to their race, color, religion, gender, national origin or political affiliation. Such action shall include, but not be limited to, the following: employment upgrading, demotion or transfer, recruitment or recruitment advertising, layoff or termination, rates of pay or other forms of compensation, and selection for training, including apprenticeship. The BIDDER agrees to post in conspicuous places, available to employees and applicants for employment, notices to be provided by the contracting officer setting forth the provisions of this nondiscrimination clause.
2. The BIDDER will, in all solicitations or advertisements for employees, placed by or on behalf of the BIDDER, state that all qualified applicants will receive consideration for employment without regard to race, color, religion, gender, national origin or political affiliation.
3. The BIDDER will send to each labor union or representative of workers with which he has a collective bargaining agreement or other contract or understanding, a notice to be provided by the agency contracting officer, advising the labor union or the workers’ representative of the BIDDER’s commitments under Section 202 of Executive Order 11246 of September 24, 1965, and shall post copies of the notice on conspicuous places available to employees and applicants for employment.
4. The BIDDER will comply with all provisions of Executive Order 11246 of September 24, 1965, and the rules, regulations and relevancy orders of the Secretary of Labor.
5. The BIDDER will furnish all information and reports required by Executive Order 11246 of September 24, 1965, and by the rules, regulations and relevant orders of the Secretary of Labor, or pursuant thereto, and will permit access to his books, records and accounts by the contracting agency and the Secretary of Labor for purposes of investigation to ascertain compliance with such rules, regulations and orders.
6. In the event of the BIDDER’s non-compliance with the non-discrimination clauses of this subcontract or with any of such rules, regulations or orders, this subcontract may be canceled, terminated or suspended, in whole, or in part and the BIDDER may be declared ineligible for further government contracts in accordance with the procedures authorized in accordance with Executive Order 11246 of September 24, 1965, and such other sanctions may be imposed and remedies invoked as provided in Executive Order 11246 of September 24, 1965, or by rule, regulation or order of the Secretary of Labor, or otherwise provided by law.
7. The BIDDER will include the provisions of Paragraphs (1) through (7) in every subcontract or purchase order unless exempted by rules, regulations or orders of the Secretary of Labor issued pursuant to Section 204 of Executive Order 11246 of September 24, 1965, so that such provisions will be binding upon each SUBBIDDER or vendor. The BIDDER will take such action with respect to any subcontract or purchase order as the contracting agency may direct as a means of enforcing such provisions including sanctions for non-compliance. Provided, however, that in the event the BIDDER becomes involved in, or is threatened with litigation with a SUBBIDDER or vendor as a 547
RFB 25-26-33, FY 25-26 CAPE SEAL PROJECT
8 result of such direction by the contracting agency, the BIDDER may request the United States to enter into such litigation to protect the interest of the United States.
Company: ______________________________________________ Business Address: ______________________________________________ Signature: ______________________________________________ Name ______________________________________________
Title ______________________________________________
Date: ______________________________________________
It is noted that Executive Order 011246 was rescinded in January 2026. 548
RFB 25-26-33, FY 25-26 CAPE SEAL PROJECT
9 SUBMIT WITH BID
CLEAN AIR AND WATER POLLUTION CONTROL CERTIFICATION
(AIR 42 U.S.C. § 7401 et seq., 40 CFR Part 15.61, 49 CFR Part 18; WATER: 33 U.S.C. § 1251)
BIDDER agrees that any facility to be used in the performance of the contract, or to benefit from the contract, is not listed on the Environmental Protection Agency List of Violating Facilities.
BIDDER also agrees to comply with all the requirements of Section 114 of the Clean Air Act, as amended, 42 U.S.C. 1857 et seq. and Section 308 of the Federal Water Pollution Control Act, as amended 33 U.S.C. 1251 et seq. relating to the inspection, monitoring, entry, reports and information, as well as all other requirements specified in Section 114 and Section 308 of the Acts, respectively, and all other regulations and guidelines issued thereunder.
BIDDER agrees that as a condition for award of the contract, the BIDDER will notify the awarding official of the receipt of any communication from the EPA indicating that a facility to be used for the performance of, or benefit from, the contract is under consideration to be listed on the EPA List of Violating Facilities.
Company: ______________________________________________ Business Address: ______________________________________________ Signature: ______________________________________________ Name ______________________________________________
Title ______________________________________________
Date: ______________________________________________
549
RFB 25-26-33, FY 25-26 CAPE SEAL PROJECT
10 SUBMIT WITH BID
NON-COLLUSION AFFIDAVIT
(Title 23 United States Code Section 112 and Public Contract Code Section 7106) In accordance with Title 23 United States Code section 112 and Public Contract Code 7106 the bidder declares that bid is not made in the interest of, or on behalf of, any undisclosed person, partnership, company, association, organization, or corporation; that the bid is genuine and not collusive or sham; the bidder has not directly or indirectly induced or solicited any other bidder to put in a false or sham bid, and has not directly or indirectly colluded, conspired, connived, or agreed with any bidder or anyone else to put in a sham bid, or that anyone shall refrain from bidding; that the bidder has not in any manner, directly or indirectly, sought by agreement, communication, or conference with anyone to fix the bid price of the bidder or any other bidder, or to fix any overhead, profit, or cost element of the bid price, or of that of any other bidder, or to secure any advantage against the public body awarding the contract of anyone interested in the proposed contract; that all statements contained in the bid are true; and, further, that the bidder has not, directly or indirectly, submitted his or her bid price or any breakdown thereof, or the contents thereof, or divulged information or data relative thereto, or paid, and will not pay, any fee to any corporation, partnership, company association, organization, bid depository, or to any member or agent thereof to effectuate a collusive or sham bid.
__________________________________________ ________________________ Signature Date
Note: The above Non-Collusion Affidavit is part of the Proposal. Signing this Proposal on the signature portion thereof shall also constitute signature of this Non-Collusion Affidavit.
Bidders are cautioned that making a false certification may subject the certifier to criminal prosecution. 550
RFB 25-26-33, FY 25-26 CAPE SEAL PROJECT
11 SUBMIT WITH BID
CERTIFICATION CONCERNING WORKER'S
COMPENSATION INSURANCE
STATE OF CALIFORNIA )
) ss
CITY OF VISALIA )
I am aware of the provisions of Section 3700 of the Labor Code which requires every employer to be insured against liability for workers' compensation or to undertake self-insurance in accordance with the provisions of that code, and I will comply with such provisions before commencing the performance of the work of this Contract.
Date:
Signature:
551
RFB 25-26-33, FY 25-26 CAPE SEAL PROJECT
12 SUBMIT WITH BID
SUBMIT WITH BID
552
RFB 25-26-33, FY 25-26 CAPE SEAL PROJECT
13 DISCLOSURE STATEMENTS
The following disclosure and statement apply to the Bidder/Proposer/Contractor/Consultant/Vendor/Supplier or Company:
1. submitting a bid or proposal in response to a solicitation by City of Visalia; or
2. as Awardee of a contract/purchase order which is subject to approval by the Visalia City Council.
OWNERSHIP DISCLOSURE
_________________________________________________________________ Name of Bidder/Proposer/Contractor/Consultant/Vendor/Supplier or Company _________________________________________________________________ Address
List the names of all principals, partners, and/or trustees. For corporations, provide names of officers, directors and all stockholders owning more than 10% equity interest in corporation:
_________________________________________________________________________________________________ __________________________________________________________________________________________________ __________________________________________________________________________________________________ __________________________________________________________________________________________________
CALIFORNIA LEVINE ACT STATEMENT
California Government Code Section 84308, also known as the “Levine Act,” can prohibit members of the Visalia City Council from participating in any action related to a contract if he or she receives any political contributions totaling more than $250 within the previous twelve (12) months, and for twelve (12) months following the date a final decision concerning the contract has been made, from the person or company awarded the contract. The Levine Act also requires disclosure of such contribution(s) by a party to be awarded a specific contract.
The following website contains a list of current Visalia City Council Members, https://www.visalia.city/government/city_council/default.asp. You are responsible for reviewing the names of Visalia City Council Members prior to making the following disclosure:
1. Have you or your company, or any agent on behalf of you or your company, made any political contributions of more than $250 to a Visalia City Council Member in the twelve (12) months preceding the date of the submission of your proposals or the anticipated date of any City Council action related to this contract? YES:_____ NO:_____ If yes, please identify the City Council Member(s) and date(s) of contribution in the space below:
Council Member(s) Name Date of Contribution(s)
______________________________ ________________________ Answering YES, does not preclude the City of Visalia from awarding a contract to your firm or from taking any subsequent action related to the contract. It does, however, preclude the identified Visalia City Council Member(s) from participating in any actions related to this contract.
NOTICE: The disclosure duty under state law continues for twelve (12) months after the award. If the above information regarding contributions changes during this time after the award, then the awardee is required to update this disclosure form. _________________________________________________________________________________ Print or Type Name of Bidder/Proposer/Contractor/Consultant/Supplier/Vendor/Company __________________________________________ ____________________________________ Signature of Company Authorized Individual Print or Type Name of Authorized Individual
SUBMIT WITH BID
553
RFB 25-26-33, FY 25-26 CAPE SEAL PROJECT
14 CERTIFICATION OF ANTI-KICKBACK COMPLIANCE
(48 Stat. 948; 62 Stat. 740; 63 Stat. 108; Title 18 U.S.C. § 8741; and 40 U.S.C. (c)) By submission of a Bid, the BIDDER certifies that it has read the “Anti-Kickback Procedures,” referenced above and that neither it nor any of its employees has performed or participated in any prohibited actions, as defined in that provision, relating to the award of the Contract. By commencing performance of the Contract work, the selected BIDDER certifies to Anti-Kickback Compliance.
Company: ______________________________________________ Business Address: ______________________________________________ Signature: ______________________________________________ Name of Signing Official: ______________________________________________ Title of Signing Official: ______________________________________________ Date: ______________________________________________
Company Seal:
554
RFB 25-26-33, FY 25-26 CAPE SEAL PROJECT
15 SUBMIT WITH BID
AMERICANS WITH DISABILITIES ACT COMPLIANCE CERTIFICATE
By submission of a bid, the BIDDER certifies it will comply with the Americans with Disabilities Act, 42 U.S.C., 12101 et. seq., and will maintain compliance throughout the life of this Contract. By commencing performance of the Contract work, the selected BIDDER certifies to the Americans with Disabilities Act compliance.
Company: ______________________________________________ Business Address: ______________________________________________ Signature: ______________________________________________ Name of Signing Official: ______________________________________________ Title of Signing Official: ______________________________________________ Date: ______________________________________________
Company Seal:
555
RFB 25-26-33, FY 25-26 CAPE SEAL PROJECT
16 SUBMIT WITH BID
CERTIFICATE OF NONSEGREGATED FACILITIES
(BIDDERS/SUBCONTRACTORS)
1. “Segregated facilities,” as used in this provision, means any waiting rooms, work areas, rest rooms and wash rooms, restaurants and other eating areas, time clocks, locker rooms and other storage or dressing areas, parking lots, drinking fountains, recreation or entertainment areas, transportation, and housing facilities provided for employees, that are segregated by explicit directive or are in fact segregated on the basis of race, color, religion, or national origin, because of habit, local custom, or otherwise.
2. By the submission of a bid, the BIDDER certifies that it does not and will not maintain or provide for its employees any segregated facilities at any of its establishments, and that it does not and will not permit its employees to perform their services at any location under its control where segregated facilities are maintained. The BIDDER agrees that a breach of this certification is a violation of the Equal Opportunity clause in the contract.
3. By submission of the bid, the BIDDER further agrees that (except where it has obtained identical certifications from proposed SUBCONTRACTORs for specific time periods) it will:
a. Obtain identical certifications from proposed SUBCONTRACTORs before the award of subcontracts under which the SUB-BIDDER will be subject to the Equal Opportunity clause;
b. Retain such certifications in its files; and
c. Forward this certification and the following notice to the proposed SUBCONTRACTORs:
NOTICE OF PROSPECTIVE SUBCONTRACTORS OF REQUIREMENT
FOR CERTIFICATION OF NONSEGREGATED FACILITIES
A certificate of Nonsegregated Facilities must be submitted before the award of a subcontract under which the SUBCONTRACTOR will be subject to the equal Opportunity clause. The certification may be submitted either for each SUBCONTRACTOR for all subcontracts during a period (i.e., quarterly, semi-annually, or annually).
4. By commencing performance of the Contract work, the selected BIDDER certifies to the Nonsegregated Facilities provisions above.
Company:
Business Address:
Signature:
Name:
Title:
Date:
SUBMIT WITH BID
556
RFB 25-26-33, FY 25-26 CAPE SEAL PROJECT
17 IRAN CONTRACTING ACT CERTIFICATION
(Public Contract Code Section 2200 et seq.)
As required by California Public Contract Code Section 2204, the Contractor certifies subject to penalty for perjury, that the option checked below relating to the Contractor’s status in regard to the Iran Contracting Act of 2010 (Public Contract Code Section 2200 et seq.) is true and correct:
Please check one:
__ The Contractor is not:
(1) Identified on the current list of persons and entities engaged in investment activities in Iran prepared by the California Department of General Services in accordance with subdivision (b) of Public Contract Code Section 2203; or
(2) A financial institution that extends, for 45 days or more, credit in the amount of $20,000,000 or more to any other person or entity identified on the current list of persons and entities engaging in investment activities in Iran prepared by the California Department of General Services in accordance with subdivision (b) of Public Contract Code Section 2203, if that person or entity uses or will use the credit to provide goods or services in the energy sector in Iran.
__ The City has exempted the Contractor from the requirements of the Iran Contracting Act of 2010 after making a public finding that, absent the exemption, the City will be unable to obtain the goods and/or services to be provided pursuant to the Contract. __ The amount of the Contract payable to the Contractor for the Project does not exceed $1,000,000 over the life of the contract (up to 5 years).
Signature: __________________________________ Printed Name: _________________________ Title: ______________________________________ Agency Name: _________________________ Date:____________________
Note: In accordance with Public Contract Code Section 2205, false certification of this form shall be reported to the California Attorney General and may result in civil penalties equal to the greater of $250,000 or twice the Contract amount, termination of the Contract and/or eligibility to bid on contracts for three years.
SUBMIT WITH BID
557
RFB 25-26-33, FY 25-26 CAPE SEAL PROJECT
18 BID PROPOSAL CONTRACT
Accompanying this proposal is $________________________ cash, cashier's check, certified check, or bidder's bond in the amount equal to at least ten percent (10%) of the total bid.
The names of all persons interested in the foregoing proposal as principals are as follows:
IMPORTANT NOTICE: If bidder or other interested person is a corporation, state legal name of corporation, also names of the president, secretary, treasurer, director and manager thereof and all stockholders owning more than 10% equity interest in corporation; if a co-partnership, state true name of firm, also names of all individual copartners composing firm; if bidder or other interested person is an individual, state first and last name in full.
______________________________________________________________________________ Print Name of Corporation or True Name of Firm
______________________________________________________________________________ Print Officer’s Name or Copartner’s Name and Title
______________________________________________________________________________ Print Officer’s/Stockholder Name or Copartner’s Name and Title ______________________________________________________________________________ Print Officer’s/Stockholder Name or Copartner’s Name and Title ______________________________________________________________________________ Print Officer’s/Stockholder Name or Copartner’s Name and Title ______________________________________________________________________________ Print Officer’s/Stockholder Name or Copartner’s Name and Title Licensed in accordance with an act providing for the registration of Contractors, License No.______________________, Class of License(s) _____________________________, License Expiration Date _____________________________________.
Department of Industrial Relations Registration No. _____________________________________.
The representations made herein are made under penalty of perjury. Any bid not containing this information, or a bid containing information which is subsequently proven false, shall be considered non-responsive and shall be rejected by the City of Visalia.
Signature of Authorized Person(s)
______________________________________________________________________________ Signature Title
______________________________________________________________________________ Print Name
NOTE: If bidder is a corporation, the legal name of the corporation shall be set forth above together with the signature of the officer or officers authorized to sign contracts on behalf of the corporation; if bidder is 558
RFB 25-26-33, FY 25-26 CAPE SEAL PROJECT
19 a co-partnership, the true name of the partner or partners authorized to sign contracts on behalf of the copartnership; and if bidder is an individual, his signature shall be placed above. If signature is by an agent, other than an officer of a corporation or a member of a partnership, a Power of Attorney must be on file with the City Clerk prior to opening bids or submitted with the bid; otherwise, the bid will be disregarded as irregular and unauthorized.
Business Address______________________________________________________________ Street Address
______________________________________________________________ City State Zip Code
Business Telephone Number _____________________________________________________ Place of Residence _______________________________________ Dated: ___________ E-mail
559
RFB 25-26-33, FY 25-26 CAPE SEAL PROJECT
20 SUBMIT WITH BID
SUBCONTRACTORS LIST
In accordance with the provisions of Section 2-8 “Designation of Subcontractors,” of the Standard Specifications, each bidder shall list below the name and location of place of business of each subcontractor who will perform a portion of the contract work in an amount in excess of one-half of one percent of the total contract price or $10,000, whichever is greater. In each instance, the nature and extent of the work to be sublet shall be described.
The general Contractor to whom the contract is awarded will not be permitted, without the written consent of the Engineer, to substitute any person as subcontractor in place of the subcontractor designated in the original bid, or to permit any subcontract to be assigned or transferred, or to allow it to be performed by anyone other than the original subcontractor. The Engineer may consent to the substitution of another person as subcontractor, if the original subcontractor, after having reasonable opportunity to do so, shall fail or refuse to execute, when said written contract is based upon the conditions of the general contract and complies with the subcontractor's written bid.
The failure of the Contractor to specify a subcontractor for any portion of the contract work in excess of onehalf of one percent or $10,000 of the total contract price shall be deemed to indicate that the Contractor intends to perform such portion himself. The subletting or subcontracting of work for which is in excess of one-half of one percent or $10,000 of the total contract price, will be allowed only with the written consent of the Engineer.
Complete Columns 1 and 4 and submit with the bid. Complete columns 2 and 3 and submit with the bid or fax to (559) 713-4801 within twenty-four (24) hours after the bid opening. Failure to provide complete information in Columns 1 through 4 will result in a non-responsive bid. See the following page for the SUBCONTRACTORS LIST table.
In Column 1 the Contractor shall also list the Subcontractor’s Department of Industrial Relations (DIR) Registration Number. This registration number is required to comply with California Labor Code provisions including section 1725.5.
560
RFB 25-26-33, FY 25-26 CAPE SEAL PROJECT
21 SUBMIT WITH BID
SUBCONTRACTORS LIST
BIDDING AGENCY:______________________________________________________ Column 1
Business Name, Location,
Contractor License Number,
Class of License, DIR
Registration Number, and
e-mail address
Column
2 Bid Item
No(s).
Column 3
A) Subcontracted
Cumulative Dollar
Amount &
B) Subcontracted
Percent of total
project
Column 4
Description of Subcontracted
Work
561
RFB 25-26-33, FY 25-26 CAPE SEAL PROJECT
22 SUBMIT WITH BID
CONTRACTOR’S REFERENCE FORM
Name of Proposing Company
Representative Name and Title
Phone Number & E-mail
THIS FORM IS TO BE SUBMITTED WITH BID.
The City reserves the right to require any Contractor to complete and submit this form at any time.
References must not be relatives of the Contractor’s representative or owners. The references given must be for clients with projects similar in size and nature to the proposed project within the last five years. See Section 2-14 “Contractor Qualification Requirements,” for further instructions.
Reference 1
Client’s name
Description of device/project and
total project cost
Contact Person
Address
City and Zip Code
Phone Number
E-mail Address
Reference 2
Client’s name
Description of device/project and
total project cost
Contact Person
Address
City and Zip Code
Phone Number
E-mail Address
Reference 3
Client’s name
Description of device/project and
total project cost
Contact Person
Address
City and Zip Code
Phone Number
E-mail Address
562
RFB 25-26-33, FY 25-26 CAPE SEAL PROJECT
23 Reference 4
Client’s name
Description of device/project and
total project cost
Contact Person
Address
City and Zip Code
Phone Number
E-mail Address
Reference 5
Client’s name
Description of device/project and
total project cost
Contact Person
Address
City and Zip Code
Phone Number
E-mail Address
563
RFB 25-26-33, FY 25-26 CAPE SEAL PROJECT
24 SUBMIT WITH BID
BIDDERS BOND
Known all men by these presents:
That we, _______________________________________________ as principal, and ________________________________________ as surety, are held and firmly bound unto the City of Visalia in the sum of ten percent (10%) of the total amount of the bid of the principal, to be paid to the said City or its certain attorney, its successors and assigns, for which payment well and truly to be made, we bind ourselves, our heirs, executors, and administrators, successors, or assigns, jointly and severally, firmly by these presented.
In no case shall the liability of the surety hereunder exceed the sum of $____________________.
THE CONDITION OF THIS OBLIGATION IS SUCH, that whereas the principal has submitted the abovementioned bid to the City of Visalia for certain construction specifically described as follows, for which bids are to be opened at ________________________ on _______________________________________ for improvement of:
RFB No.: 25-26-33
Project Name: FY 25-26 CAPE SEAL
Project No.: 1410-72000/CP0247-999
NOW THEREFORE, if the aforesaid principal is awarded the contract, and within the time and manner required under the specifications, after the prescribed form in accordance with the bid, and files the two bonds with the City of Visalia, one to guarantee faithful performance and the other to guarantee payment of labor and materials, as required by law, then this obligation shall be null and void, otherwise it shall be and remain in full force and virtue.
564
RFB 25-26-33, FY 25-26 CAPE SEAL PROJECT
25 BIDDER'S BOND
In the event suit is brought upon this bond by the obligee and judgment is recovered, the surety shall pay all costs incurred by the obligee in such suit, including a reasonable attorney's fee to be fixed by the court.
IN WITNESS WHEREOF, we have hereunto set our hands and seals on this _____________________ day of _____________________________20_____. _______________________________________(Seal)
_______________________________________(Seal)
_______________________________________(Seal)
_______________________________________(Seal)
_______________________________________(Seal)
_______________________________________(Seal)
Surety
_____________________________________________
Address
_____________________________________________
City and Zip Code
NOTE: Signatures of those executing for the surety must be properly acknowledged. 565
RFB 25-26-33, FY 25-26 CAPE SEAL PROJECT
26 CONTRACT
CITY OF VISALIA
STATE OF CALIFORNIA
This Contract for the construction of the FY 25-26 CAPE SEAL, is made between the City of Visalia, (hereinafter “The City”), and _______________________________________, (hereinafter referred to as Contractor) both parties having authority to enter into this Contract do agree to the following:
ARTICLE I - For and in consideration of the payments hereinafter mentioned to be made by the City, and under the conditions expressed in this Contract and Contract Documents (as those terms are defined in City of Visalia Engineering Standard Specifications), including the bonds submitted with this Contract, Contractor agrees at his own cost and expense, to do all the work and furnish all the materials necessary to construct and complete in a good, workmanlike, and substantial manner, the FY 25-26 CAPE SEAL, as a fully operational and functional facility for the intended purpose in accordance with the Contract Documents, and in accordance with the reference documents listed in the Contract Documents, which are also made a part hereof.
Said work to be done is shown upon the following plans:
RFB No.: 25-26-33
Project Name: FY 25-26 CAPE SEAL
Project No.: 1410-72000/CP0247-999
which said plans are hereby made a part of this contract.
ARTICLE II - Contractor agrees to receive and accept the following prices as full compensation for furnishing all materials and for doing all the work described in this Contract; also for all loss or damage arising out of the nature of the work aforesaid, or from the action of the elements, or from any unforeseen difficulties or obstructions which may arise or be encountered in the prosecution of the work until its acceptance by the City of Visalia and for all risks of every description connected with the work; also for all expenses incurred by or in consequence of the suspension or discontinuance of work and for well and faithfully completing the work, and the whole thereof, in the manner and according to the Contract Documents, and requirements of the Engineer under them, to wit:
566
RFB 25-26-33, FY 25-26 CAPE SEAL PROJECT
27 COMPLETED BID SCHEDULE TO BE INSERTED HERE IN FINAL CONTRACT 567
RFB 25-26-33, FY 25-26 CAPE SEAL PROJECT
28 ARTICLE III - Contractor hereby agrees to indemnify and hold City and its officers, agents, employees and assigns, harmless from any liability imposed for injury (as defined by Government code 810.8), whether arising before or after completion of work hereunder, or in any manner directly or indirectly caused, occasioned or contributed to, or claimed to be caused, occasioned or contributed to, in whole or in part, by reason of any act or omission, including strict liability or negligence of Contractor, or of anyone acting under Contractor's direction or control or on its behalf, in connection with or incident to or arising out of the performance of this contract.
It is the intent of the parties that Contractor will indemnify, defend, and hold harmless City and its officers, agents, employees, and assigns, from any and all claims, demands, costs, suits or actions as set forth above regardless of the existence of passive concurrent negligence, on the part of the City or anyone acting under its direction or control or on its behalf. It is further the intent of the parties that this indemnification required is not intended to relieve City from liability for the active negligence of City, its officers, agency and employees.
The Contractor shall continuously protect City property, including work under construction, from damage, loss, or liability of any kind to persons or property arising in connection with the contract, direct or indirect, including that arising from rainfall, flood waters, and other action of the elements and all acts of third parties.
This indemnity and hold harmless provision, insofar as it may be adjudged to be against public policy, shall be void and unenforceable only to the minimum extent necessary so that the remaining terms of this indemnity and hold harmless provision may be within public policy and enforceable.
In an emergency affecting the safety of life or limb, work site, or any property, the Contractor is hereby permitted and directed to act at their discretion to prevent such threatened loss of injury, and in the event any instructions are given by the City of Visalia in any emergency, the Contractor shall unconditionally comply therewith.
With respect to the performance of work under this agreement, the Contractor shall maintain and shall require all of its subcontractors to maintain insurance as described below.
Worker's Compensation insurance with statutory limits, and employer's liability insurance with limits of not less than $1,000,000 per accident.
Commercial General Liability insurance with a combined single limit of not less than $1,000,000 per occurrence. Such insurance shall include products/completed operations liability, owner's and Contractor's protective, blanket contractual liability, personal injury liability, broad form property damage coverage and explosion, collapse and underground hazard coverage. Such insurance shall (a) name City, its appointed and elected officials, officers, employees and agents as insureds; and (b) be primary with respect to any insurance or self-insurance programs maintained by the City; and (c) contain Standard cross liability provisions. Such 568
RFB 25-26-33, FY 25-26 CAPE SEAL PROJECT
29 additional insured endorsement maintained by Contractor and its subcontractors shall not be required to provide coverage for City for the active negligence of City.
Commercial Automobile Liability insurance with a combined single limit of not less than $1,000,000 per occurrence. Such insurance shall include coverage for owned, hired and non-owned automobiles and shall be provided by a business automobile policy.
Contractor shall furnish properly executed certificates of insurance to City prior to commencement of work under this agreement, such certificates shall:
a. Clearly evidence all coverage required above, including specific evidence of a separate endorsement naming the City as an insured;
b. Indicate whether coverage provided is on a claims-made or occurrence basis; and c. Provide that such insurance shall not be materially changed, terminated, or allowed to expire except on 30-days prior written notice to City’s Purchasing Division, Attention:
Purchasing
707 W. Acequia Avenue
Visalia, CA 93291.
Such insurance shall be maintained from the time work first commences until completion of the work under this Agreement if an occurrence policy form is used. If a claim made policy is used, coverage shall be maintained during the contract term and for a period extending 5 years beyond the contract date. Contractor shall replace such certificates for policies expiring prior to completion of work under this agreement and shall continue to furnish certificates 4 years beyond the contract term, when Contractor has a claim made form(s). If Contractor, for any reason, fails to maintain insurance coverage which is required pursuant to this agreement, the same shall be deemed a material breach of contract. City, at its sole option, may terminate this agreement and/or obtain damages from the Contractor resulting from said breach. Alternatively, City may purchase such required insurance coverage, and without further notice to Contractor, City may deduct from sums due to Contractor any premium costs advanced by City for such insurance.
This insuring provision, insofar as it may be adjudged to be against public policy or in violation of Insurance Code Section 11580.04, shall be void and unenforceable only to the minimum extent necessary so that the remaining terms of the insuring provisions herein may be within public policy and enforceable. 569
RFB 25-26-33, FY 25-26 CAPE SEAL PROJECT
30 ARTICLE IV - It is further expressly agreed by and between the City and the Contractor that should there be any conflict between the terms of this instrument and the bid or proposal of said Contractor, then this instrument shall control and nothing herein shall be considered as an acceptance of the said terms of said proposal conflicting with this instrument.
Executive Order N-6-22 – Russia Sanctions. On March 4, 2022, Governor Gavin Newsom issued Executive Order N-6-22 (the EO) regarding Economic Sanctions against Russia and Russian entities and individuals. “Economic Sanctions” refers to sanctions imposed by the U.S. government in response to Russia’s actions in Ukraine, as well as any sanctions imposed under state law. The EO directs state agencies to terminate contracts with, and to refrain from entering any new contracts with, individuals or entities that are determined to be a target of Economic Sanctions. Accordingly, should the State determine Contractor is a target of Economic Sanctions or is conducting prohibited transactions with sanctioned individuals or entities, that shall be grounds for termination of this agreement. The State shall provide Contractor advance written notice of such termination, allowing Contractor at least 30 calendar days to provide a written response. Termination shall be at the sole discretion of the State.
IN WITNESS WHEREOF, the parties have executed this agreement as of the date opposite their respective signatures.
CITY OF VISALIA
____________________________ _______
City Manager Date
CONTRACTOR
______________________________________
By: Authorized Agent Date
______________________________________
Print Name, Title
APPROVED AS TO FORM:
____________________________ _______
City Attorney Date
____________________________ _______
Risk Manager Date
____________________________ _______
Project Manager Date
570
RFB 25-26-33, FY 25-26 CAPE SEAL PROJECT
31 CONTRACT BOND FORMS
571
RFB 25-26-33, FY 25-26 CAPE SEAL PROJECT
32 CITY OF VISALIA
PAYMENT BOND
(To Accompany Contract)
Bond No. ____________________
WHEREAS, the City of Visalia, has awarded to Contractor _____________________________________________ _________________________, hereafter designated as the “Principal”, a contract for the work described as follows:
____________________________________________________________________________________________, referred to hereafter as “Contract.”
AND WHEREAS, said Principal is required to furnish a bond in connection with said contract, to secure the payment of claims of laborers, mechanics, materialmen and other persons as provided by law.
NOW, THEREFORE, we the undersigned Principal and _____________________________________________, referred to as “Surety” are bound unto the City of Visalia in the sum of $___________________________________ ________________________________________________ dollars ($ ___________________________), for which payment, we bind ourselves, jointly and severally.
THE CONDITION OF THIS OBLIGATION IS SUCH, that if said Principal or its subcontractors shall fail to pay any of the persons named in Civil Code Section 9100, or amounts due under the California Unemployment Insurance Code with respect to work or labor performed by such claimant, or any amounts required to be deducted, withheld, and paid pursuant to the California Revenue and Taxation Code for the wages of employees of the Principal and his subcontractors, with respect to such work and labor, that the Surety herein will pay for the same in an amount not exceeding the sum specified in this bond, otherwise the above obligation shall be void. In case suit is brought upon this bond, the surety will pay a reasonable attorney’s fee to be fixed by the court.
This bond shall inure to the benefit of any of the persons, companies, or corporations, named in Civil Code Section 9100 as to give a right of action to such persons, entities, or their assigns in any suit brought upon this bond.
The Surety, for value received, hereby stipulates and agrees that no change, extension of time, alteration, or addition to the terms of the Contract or to the work to be performed under the Contract, or the specifications accompanying the Contract shall in any way affect its obligations on this bond, and Surety does hereby waive notice of any such change, extension of time, alteration, or addition to the terms of the Contract, or to the specified work, or the specifications.
Surety hereby waives the provisions of Civil Code Sections 2819 and 2845.
IN WITNESS WHEREOF, We have hereunto executed this instrument on the date indicated below. Persons signing for a corporation or entity hereby represent that they are doing so pursuant to a grant of authority by the governing body.
_________________________________ _______ _________________________________ _______ Name of Principal Date Name of Surety Date
_________________________________ _________________________________ Signature for Principal Signature for Surety
_________________________________ _________________________________ Printed Name and Title Printed Name and Title
Correspondence or claims relating to this bond
should be sent to the surety at the following
address:
___________________________
___________________________
___________________________
NOTE: Signatures of those executing for the Surety must be properly acknowledged and Surety’s Power of Attorney must be attached.
572
RFB 25-26-33, FY 25-26 CAPE SEAL PROJECT
33 CERTIFICATE OF ACKNOWLEDGEMENT
State of California
County of ________________________________________ SS
On ____________ ___________________ before me _________________________________________________, personally appeared ____________________________________________________________________________, who proved to me on the basis of satisfactory evidence to the be the person(s) whose name is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument.
I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct.
(SEAL) Notary Public
A notary public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document. 573
RFB 25-26-33, FY 25-26 CAPE SEAL PROJECT
34 CITY OF VISALIA
PERFORMANCE BOND
(To Accompany Contract)
Bond No. ____________________
WHEREAS, the City of Visalia, has awarded to Contractor _____________________________________________ _________________________, hereafter designated as the “Principal”, a contract for the work described as follows:
_____________________________________________________________________________________________, referred to hereafter as “Contract.”
AND WHEREAS, said Principal is required to furnish a bond in connection with the above Contract, guaranteeing the faithful performance thereof:
NOW, THEREFORE, we the undersigned Principal and ______________________________________________, referred to as “Surety” are held firmly bound to the City of Visalia in the sum of $ ___________________________ _________________________________________________ dollars ($ ______________________________), to be paid to said City or its certain attorney, its successors and assigns: for which payment, well and truly to be made, we bind ourselves, our heirs, executors and administrators, successors or assigns, jointly and severally, firmly by these presents.
THE CONDITION OF THIS OBLIGATION IS SUCH, that if the above bound Principal, its heirs, executors, administrators, successors or assigns, shall in all things stand to and abide by and well and truly keep and perform the covenants, conditions, and agreements in the Contract and any alteration thereof, made as therein provided, on it or their part to be kept and performed within the time and in the manner therein specified, and in all respects according to their intent and meaning, and shall indemnify and save harmless the City of Visalia, its officers and agents, as therein stipulated, then this obligation shall become and be null and void; otherwise it shall be and remain in full force and virtue.
The said Surety, for value received, hereby stipulates and agrees that no change, extension of time, alteration, or addition to the terms of the Contract or to the work to be performed under the Contract, or the specifications accompanying the Contract shall in any way affect its obligations on this bond, and Surety does hereby waive notice of any such change, extension of time, alteration, or addition to the terms of the Contract, or to the specified work, or the specifications. Surety hereby waives the provisions of Civil Code Sections 2819 and 2845.
IN WITNESS WHEREOF, We have hereunto executed this instrument on the date indicated below. Persons signing for a corporation or entity hereby represent that they are doing so pursuant to a grant of authority by the governing body.
_________________________________ _______ _________________________________ _______ Name of Principal Date Name of Surety Date
_________________________________ _________________________________ Signature for Principal Signature for Surety
_________________________________ _________________________________ Printed Name and Title Printed Name and Title
Correspondence or claims relating to this bond
should be sent to the surety at the following
address:
___________________________
___________________________
___________________________
___________________________
NOTE: Signatures of those executing for the Surety must be properly acknowledged and Surety’s Power of Attorney must be attached.
574
RFB 25-26-33, FY 25-26 CAPE SEAL PROJECT
35 CERTIFICATE OF ACKNOWLEDGEMENT
State of California
County of ________________________________________ SS
On ____________ ___________________ before me _________________________________________________, personally appeared ____________________________________________________________________________, who proved to me on the basis of satisfactory evidence to the be the person(s) whose name is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument.
I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct.
(SEAL) Notary Public
A notary public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document. 575
RFB 25-26-33, FY 25-26 CAPE SEAL PROJECT
36 CITY OF VISALIA
MAINTENANCE BOND
(To Accompany Contract)
Bond No. ____________________
WHEREAS, The City of Visalia, has awarded to Contractor ____________________________________________ _________________________, hereafter designated as the “Principal”, a contract for the work described as follows:
_____________________________________________________________________________________________, referred to hereafter as “Contract.”
AND WHEREAS, said Principal is required to furnish a bond in connection with said contract, guaranteeing the correction of deficiencies during the specified maintenance period of one (1) year from the date the notice of completion for work performed under said contract has been recorded or the date the work was completed if no notice of completion is recorded:
NOW, THEREFORE, we the undersigned Principal and ______________________________________________, referred to as “Surety” are held firmly bound to the City of Visalia in the sum of $___________________________ __________________________________________________ dollars ($ _____________________________), to be paid to City of Visalia or its certain attorney, its successors and assigns: for which payment, well and truly to be made, we bind ourselves, our heirs, executors and administrators, successors or assigns, jointly and severally, firmly by these presents.
THE CONDITION OF THIS OBLIGATION IS SUCH, the named Principal has made specific guarantees to the City concerning the work, labor and materials furnished for the construction of said improvements as stated above. If Principal complies with these guarantees for a period of one (1) year from the date of the notice of completion for work performed under said contract has been recorded or the date the work was completed if no notice of completion is recorded, then this obligation shall be null and void. If City notifies Surety that Principal has not met its guarantee, then Surety shall indemnify City for losses incurred up to the amount listed above. The City shall give written notice to the Principal during the one (1) year period specified in this obligation of any defect of the guaranteed work that becomes apparent. This obligation shall remain in full force and effect until any defect identified in said written notice are repaired by the Principal and accepted in writing by the City.
The said Surety, for value received, hereby stipulates and agrees that no change, alteration, or addition to the terms of the Contract or to the work to be performed under the Contract, or the specifications accompanying the Contract shall in any way affect its obligations on this bond, and Surety does hereby waive notice of any such change, alteration, or addition to the terms of the Contract, or to the specified work, or the specifications. Surety hereby waives the provisions of Civil Code Sections 2819 and 2845.
IN WITNESS WHEREOF, We have hereunto executed this instrument on the date indicated below. Persons signing for a corporation or entity hereby represent that they are doing so pursuant to a grant of authority by the governing body.
_________________________________ _______ _________________________________ _______ Name of Principal Date Name of Surety Date
_________________________________ _________________________________ Signature for Principal Signature for Surety
_________________________________ _________________________________ Printed Name and Title Printed Name and Title
576
RFB 25-26-33, FY 25-26 CAPE SEAL PROJECT
37 Correspondence or claims relating to this bond
should be sent to the surety at the following
address:
___________________________
___________________________
___________________________
___________________________
NOTE: Signatures of those executing for the Surety must be properly acknowledged and Surety’s Power of Attorney must be attached.
577
RFB 25-26-33, FY 25-26 CAPE SEAL PROJECT
38 CERTIFICATE OF ACKNOWLEDGEMENT
State of California
County of ________________________________________ SS
On ____________ ___________________ before me _________________________________________________, personally appeared ____________________________________________________________________________, who proved to me on the basis of satisfactory evidence to the be the person(s) whose name is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument.
I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct.
(SEAL) Notary Public
A notary public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document. 578
RFB 25-26-33, FY 25-26 CAPE SEAL PROJECT
39 CONTRACTOR’S FINAL PAYMENT AFFIDAVIT
I, ___________________________________, declare under penalty of perjury under the (Affidavit’s Name)
laws of the State of California and the provisions of the California Labor Code:
§1771, §1773.1, §1775, §1776, §1777.5, §1813 and §1815 that:
1. I am the ____________________________of ________________________and I (Officer, Owner, Partner) (Company)
am responsible for the payment of persons employed by _____________________________ (Company)
who performed work on the City of Visalia Project entitled:
2. During all payroll periods from ______________through ____________, (first work date) (last work date)
All persons employed by __________________________________________on this project (Company)
have at all times been paid, at a minimum, the specified general prevailing rate of per diem wages and any amounts due.
3. During all payroll periods on this project, all apprenticeship requirements have been complied with.
Executed and sworn to this day of , ______
(Day) (Month) (Year)
___________________________________ __________________
(Signature) (Date)
This is to be completed and submitted to the City of Visalia with the Contractor’s Final Payment Request.
The Contractor is responsible for collecting this completed form from all subcontractors and must keep a copy in Contractor’s files. The City reserves the right to request a copy of the signed subcontractor affidavits at any time.
579
RFB 25-26-33, FY 25-26 CAPE SEAL PROJECT
40 STANDARD SPECIFICATIONS
The “City of Visalia Engineering Standard Specifications” Section 1 through Section 59, and any amendments or addenda thereto, are referenced herewith in its entirety and have been included in the RFB and Contract Documents. Copies of the most recent “City of Visalia Engineering Standard Specifications” may be obtained from the City of Visalia website at:
http://www.visalia.city/depts/community_development/engineering/engineering_documents.asp or from City Hall East, 315 E. Acequia Ave., Visalia, California, 93291, for a nominal fee. 580
RFB 25-26-33, FY 25-26 CAPE SEAL PROJECT
41 SPECIAL PROVISIONS SECTIONS 60-80
SECTION 60 JOB SPECIFIC PROVISIONS
60-1 Bid Proposal
Bids shall be submitted in a sealed envelope. The outside, upper left-hand corner of the envelope will have the Bidder’s Name and mailing address. In the center of the envelope it shall be addressed as follows:
City of Visalia Purchasing Department
707 W. Acequia Avenue
Visalia, CA 93291
The lower left-hand corner shall be clearly marked:
Sealed Bid For: 25-26-33, CAPE SEAL PROJECT
Submittal Deadline: 2:00 P.M. on THURSDAY, FEBRUARY 26, 2026 Bids/RFP’s must be received prior to the date and time stated. Bids received after the Bid Deadline will be rejected. Bids may be shipped via Fed Ex or UPS or may be hand-delivered during normal business hours.
Delivery of Bid: When sending a bid via Fed Ex, UPS, etc., it is the responsibility of the Bidder to ensure that Bid is received during open office hours. Office Hours are 7:30am – 5:00pm Monday through Thursday. We are closed on Fridays and major holidays. Bids are not delivered or received when office is closed.
The City utilizes an outside service for delivery and sorting incoming mail, and therefore, mailing a bid via U.S. Mail is not recommended as there could be a delay in receiving bids by the deadline. Bids must be received prior to the deadline. The City will not accept a postmark as evidence of delivery.
Night Drop Box: If delivering a bid after hours, a Night Drop Box is located at Visalia City Hall, 707 W. Acequia Avenue, Visalia, CA 93291. Enter the west parking lot of the building off of Stevenson Street. The Drop Box is labeled “Night Drop” and is located on the building across from the bicycle racks. The Night Drop Box should only be utilized if City Offices are Closed. The Night Drop Box is checked prior to the bid deadline. 581
RFB 25-26-33, FY 25-26 CAPE SEAL PROJECT
42 60-2 Subcontracting
Should any bidder propose subcontracting any part of the work covered by these Construction Documents, he shall submit with his bid a description of the work to be done by each subcontractor and the name and location of the place of business of each subcontractor as a part of the “Bidder’s Proposal”. The Contractor shall perform work equaling at least fifty percent (50%) of the value of the original total bid with the Contractor’s own employees and equipment, owned or rented, with or without operators.
No subcontract releases the Contractor from the contract or relieves the Contractor of their responsibility for a subcontractor’s work. If the Contractor violates Pub Cont Code § 4100 et seq., the City of Visalia may exercise the remedies provided under Pub Cont Code § 4110. The City may refer the violation to the Contractors State License Board as provided under Pub Cont Code § 4111. Each subcontract must comply with the contract. Each subcontractor must have an active and valid State contractor’s license with a classification appropriate for the work to be performed (Bus & Prof Code, § 7000 et seq.). Submit copies of subcontracts upon request by the Engineer. Before subcontracted work starts, submit a Subcontracting Request form. Do not use a debarred contractor; a current list of debarred contractors is available at the Department of Industrial Relations web site at:
http://www.dir.ca.gov/dlse/debar.html
Upon request by the Engineer, immediately remove and not again use a subcontractor who fails to prosecute the work satisfactorily. Noncompliance shall be corrected. Payment for subcontracted work involved will be withheld from progress payments due or to become due, until correction is made. Failure to comply may result in termination of the contract.
60-3 Prevailing Wages
This project will be subject to all applicable State Wage Determinations. The Contractor will be responsible for paying wages from the State Wage Determinations for all trades. The wages are set forth in the General Prevailing Wage Rates for this project, available at City of Visalia address and available from the California Department of Industrial Relations’ Internet web site: http://www.dir.ca.gov/dlsr/PWD/index.htm. 60-4 Beginning of Work
The Contractor shall begin work within Ten (10) days after receiving notice that the contract has been approved (Notice to Proceed) and shall diligently prosecute the same to final completion of the total project Fifty-Five (55) working days after that work begins (mobilization).
The first paragraph of Standard Specification Section 8-6 Beginning of Work shall be deleted and replaced with the following paragraph:
The City of Visalia should hold a preconstruction conference with the Contractor and other entities affected by the work within ten (10) days after the City Council awards the Contract. The Contractor shall begin work within the number of days listed above in this section after receiving notice that the contract has been approved (Notice to Proceed). The Contractor shall be responsible for obtaining the approved Encroachment Permit, submitting all of the other documents required by the City, obtaining all necessary permits, and obtaining all approvals/acceptances required for the project prior to starting construction. Should the Contractor fail to obtain the required permits and approvals within the number of days listed in this section for the beginning of work after the Notice to Proceed is issued, the length of time beyond the number of days 582
RFB 25-26-33, FY 25-26 CAPE SEAL PROJECT
43 listed will be subtracted as working days from the Contract. The Contractor shall commence work under the contract within the time specified above and shall diligently prosecute the same to completion within the time limit provided. The Contractor shall not begin work in advance of receiving the Notice to Proceed without written authorization from the Engineer. The Contractor shall notify the Inspector and Engineer in writing a minimum of two (2) working days prior to starting work. 60-5 Work Hours
Working hours on arterials and collectors shall be 9:00 am to 3:00 pm Monday thru Friday. All other roadways shall be 7:00 am to 4:00 pm Monday thru Friday. If night or weekend work is requested, it shall be approved by the City prior to beginning the work.
60-6 Liquidated Damages
The Contractor shall pay the City of Visalia the sum of THREE THOUSAND DOLLARS ($3,000.00) per day for each and every calendar day delay in finishing the work as required for final completion within the number of working days prescribed above. All final paperwork, funding paperwork, operation and maintenance manuals, other manuals, warranties, extra materials, bonds, and all other items/documents required in the Contract Documents shall be properly completed and submitted to the City within the time limit specified for completion of the work or Liquidated Damages will apply until such time all items are properly completed and submitted to the City.
60-7 Project Size
The Contractor will be required to comply with all of the Dust Control, Water Pollution Prevention, and other permitting requirements of the Standard Specifications. 60-8 Construction Surveying/Staking
The City Surveying Crew will NOT be providing Construction Staking/Surveying services in accordance with Section 5-14 for this project.
60-9 Traffic Detours
Shall be detailed in your submitted traffic control plan and approved by the City prior to construction. 60-10 Location to Salvage Items
All items specified in the Contract Documents to be salvaged shall be cleaned, sorted, and delivered to the City of Visalia Corporation Yard at 336 N. Ben Maddox Way, Visalia, CA 93292. Corporation Yard is a locked facility therefore Contractor must coordinate with City’s Project Manager to make deliveries. 60-11 Storage of Materials
The Contractor shall obtain the prior approval of the City of Visalia (City) for any area or space required for Contractor's storage during construction operations. Materials, equipment, etc., shall not be piled or stored in any location which shall interfere with the conduct of normal City functions and shall not constitute a hazard to persons or property. Any required safety precautions such as signs, danger signals, lanterns, barricades, etc., shall be installed and maintained by the Contractor during construction operations. Use of any private property shall have written permission from the property owner. A copy of which shall be provided to the Project Manager.
583
RFB 25-26-33, FY 25-26 CAPE SEAL PROJECT
44 Full compensation for conforming to the requirements of this Section shall be considered as being included in the total contract price and no additional compensation shall be made therefor. 60-12 Coordination of Work
It shall be the responsibility of the Contractor to maintain overall coordination of the work. Based on the general contract Construction Schedule prepared in accordance with these Specifications, the Contractor shall obtain from each subcontractor, including the private utility companies, Southern California Edison, AT&T, Southern California Gas Co., California Water Service Co., Comcast, and others, a similar schedule and shall be responsible for all parties maintaining these schedules or for coordinating changes necessitated in order to meet the specified time of completion of the work. The Contractor shall coordinate with all subcontractors and utilities prior to construction and throughout the duration of construction to ensure that the project schedule is maintained.
Full compensation for conforming to the requirements of this Section shall be considered as being included in the total Contract price and no additional compensation shall be made therefor. 60-13 Utility Coordination
The Contractor shall be responsible for coordinating all of the necessary utility work associated with the project with the appropriate utility companies including, but not limited to, Southern California Edison, AT&T, Southern California Gas Co., California Water Service Co., Comcast and any other utility company whose infrastructure will be affected by the City project. The Contractor shall coordinate with all of the affected companies prior to commencing construction and throughout the duration of construction.
The Contractor shall provide a minimum of 5 working days notification, or a longer notification time as required by the utility, whichever is greater, to the utility to perform simple infrastructure modifications like raising and lowering valve cans. Much longer notification lead times are required for more significant infrastructure adjustments like re-routing laterals, installing new laterals and lines, and other infrastructure modifications. The Contractor shall be responsible for coordinating with the utility and providing the proper notification. No utility infrastructure shall be covered by the project improvements prior to the utility being notified and completely tying out their infrastructure so it can be located.
Gas Company valves and facilities must be accessible at all times throughout the duration of construction.
During paving operations the Contractor shall have the Gas Company present to raise valve cans and other infrastructure. The Contractor will be responsible for performing paving operations in a manner to place, compact, and finish hot mix asphalt paving around gas cans and infrastructure.
Unless noted otherwise in the Plans or Special Provisions, for all other utilities the Contractor shall coordinate and have the utilities complete the raising of valve cans and other infrastructure within 5 working days of the final paving operations being completed. All utilities will be responsible for raising and placing concrete collars around their own infrastructure per City Standards and Specifications. The Contractor will be responsible for placing the final top lift of hot mix asphalt on top of all utility company valve and infrastructure collars. Hot Mix Asphalt shall be supplied and placed in accordance with the Standard Plans and Standard Specifications. The Contractor shall be responsible for installing the top lift of asphalt as soon as possible after the concrete collars have cured.
584
RFB 25-26-33, FY 25-26 CAPE SEAL PROJECT
45 Full compensation for conforming to the requirements of this Section shall be considered as being included in the total Contract price and no additional compensation shall be made therefor, except for traffic control as noted in the following paragraph.
The Contractor shall provide traffic control in accordance with Section 12 “Traffic Control; Construction Area Traffic Control Devices,” of the Standard Specifications for all utility companies as necessary for the utility companies to complete their work for the project. Full compensation for this traffic control will be included in the lump sum price paid for Traffic Control. No additional payment will be made therefor. 60-14 Meetings
The Contractor shall be required to attend meetings with the City of Visalia, as determined by the engineer, throughout the duration of the construction project. The Contractor is required to provide updated construction schedules at this meeting. The construction work for the next two weeks following the meeting will be discussed and coordinated. The Contractor should be prepared to discuss construction means and methods and equipment and crew availability at this meeting. At the Engineer’s option, the City may prepare minutes for each meeting and forward them to Contractor; Contractor’s failure to correct the minutes within two (2) working days shall be deemed agreement with the content of the minutes. The City has the right to audiotape or videotape any meeting.
Full compensation for conforming to the requirement of this Section shall be considered as being included in the total Contract price and no additional compensation shall be made therefore. 60-15 Environmental Mitigation & Requirements
This maintenance project has no significant impacts on the environment and no environmental mitigations are required at this time. The Contractor must still comply with any State and Local environmental requirements that may apply.
60-16 Payment for Items Not Covered by Specific Bid Items Wherever work called for and described in the Contract Documents is not specifically covered in the bid items, payment for such work shall be considered as being included in the total contract price, and no additional compensation will be allowed therefor.
60-17 Standard Specification Amendments
The “City of Visalia Engineering Standard Specification Amendments,” most current edition available at the time of bidding, is referenced herewith in its entirety and is included in the RFB and Contract Documents.
Copies of the most recent “City of Visalia Engineering Standard Specification Amendments” may be obtained from the City of Visalia website at:
http://www.visalia.city/depts/community_development/engineering/engineering_documents.asp. 60-18 Copies of Plans and Construction Specifications
The City will provide the Contractor with a thumb drive with the project Plans and Construction Specifications at no cost. It shall be the responsibility of the Contractor to procure and pay for any additional copies or any other documents needed.
585
RFB 25-26-33, FY 25-26 CAPE SEAL PROJECT
46 60-19 Department of Industrial Relations Requirements, Public Works Contractor Registration Program and Project Labor Agreements
All contractors and subcontractors bidding and performing work on Public Works Projects must:
Register on an annual basis with the California Department of Industrial Relations (DIR) Furnish electronic payroll records for new projects to the Labor Commissioner No contract will be awarded unless that contractor and all subcontractors are registered with the California Department of Industrial Relations (DIR). Bids by unregistered contractors may be rejected as nonresponsive.
A contractor or subcontractor shall not be qualified to bid on, be listed in a bid proposal, subject to the requirements of Section 4104 of the Public Contract Code or engage in the performance of any contract for public work, as defined in this chapter, unless currently registered and qualified to perform public work pursuant to Section 1725.5. It is not a violation of this section for an unregistered contractor to submit a bid that is authorized by Section 7029.1 of the Business and Professions Code or by Section 10164 or 20103.5 of the Public Contract Code, provided the contractor is registered to perform public work pursuant to Section 1725.5 at the time the contract is awarded.
If a project labor agreement (the term “project labor agreement” is defined in Public Contract Code 2500(b)(1) as a pre-hire collective bargaining agreement that establishes terms and conditions of employment for a specific construction project or projects and is an agreement described in Section 158(f) of Title 29 of the United States Code) is used, then it must comply with the taxpayer protection provisions set forth in Public Contract Code section 2500(a). City of Visalia has no ordinances requiring or prohibiting such agreements.
586
RFB 25-26-33, FY 25-26 CAPE SEAL PROJECT
47 SECTION 61 GENERAL REQUIREMENTS
61-1 General description of the work
The work to be completed under this contract consists of furnishing all labor, materials, tools, equipment, transportation, supplies, and incidentals for performing all the work involved in the FY 25-26 Cape Seal project in the City of Visalia, in accordance with attached maps and street lists, specifications, contract documents and requirements of the bid documents.
61-2 Preconstruction conference
The City of Visalia will hold a preconstruction conference with the Contractor and other entities affected by the work within ten (10) days after the City Council awards the Contract. This conference will give the City and Contractor the opportunity to discuss the preliminary construction schedule, traffic control plan, proposed sequence of work, notification procedures for public agency and property owner, and construction procedures. The Contractor's superintendent for this project shall be present and shall have reviewed the contract documents and be prepared to discuss the work. 61-3 Location of work
The project sites are located in the City of Visalia, Tulare County, California. The specific site locations are designated on the street lists and attached maps. 61-4 Qualifications of the contractor
The Contractor, in order to qualify for award of contract, shall have been engaged in the construction of Cape Seal street projects similar to that specified herein. This project requires the Contractor to have a Class A or combination of Class C licenses to perform all aspects of work. All Contractors, General Contractors, and Subcontractors shall have a minimum experience of five projects of similar size and nature to the proposed project. All General Contractors shall be required to submit a complete CONTRACTOR’S REFERENCE FORM with their bid unless otherwise noted on the blank copy of this form located in the beginning portion of the bidding documents.
Contractor shall ensure, to the satisfaction of the Engineer, the personnel assigned are experienced and competent to carry out the proposed construction.
61-5 Construction schedule and order of work
Contractor shall submit a construction schedule in conformance with the requirements of the Contract Documents. This schedule shall indicate job completion within the specified time. If at any time the average rate of daily progress is applied to the remaining contract time with the result that late completion is indicated, the City may order a new schedule to aid in timely completion of the project. 61-6 Cooperation with others
At all times, Contractor shall extend full cooperation to other contractors and to all others performing work within or adjacent to the project areas, including employees and contractors of the City and all utilities and their employees. The Contractor is required to provide 2 responsible contacts for 24-hour contact in the case of emergency. The Project Manager shall be notified if anyone else is working on the same street at the same time.
587
RFB 25-26-33, FY 25-26 CAPE SEAL PROJECT
48 61-7 Materials submittals
Contractor shall review, stamp with his approval, and submit for review by Engineer, three copies of material submittals as required by the Contract Documents. The submittals shall include, but not necessarily be limited to, the following items:
Traffic Control Plan
Chip Seal Screenings
Asphalt-Rubber Binder Formulation
Microsurface Aggregate
Microsurface Emulsion
Micro-Surfacing Mix Design
Traffic Striping Layout Plan
Traffic Striping Paint
Reflective Beads
Traffic Markers (raised)
Traffic Marker Adhesive
61-8 Project site maintenance
Protection of Existing Improvements
All existing improvements, including fences, curbs, gutters, sidewalks, landscaping, irrigation systems, structures, signs, poles, etc., located adjacent to the work area shall be protected from any damage and preserved in their previously existing conditions throughout the duration of the project.
Should any improvements become damaged through the actions of the Contractor, it shall be repaired to its pre-existing condition at the contractor’s expense and at no expense to the City or Owner.
Protection of Existing Utilities
All existing utilities adjacent to the work area shall be protected from any damage and preserved in their previously existing condition throughout the duration of the project. Any damage to these lines shall be repaired to the satisfaction of the respective utility company at the contractor’s expense and at no additional expense to the City or owner.
Cleanup and Dust Control
Throughout all phases of construction, including any suspension of work, and until final acceptance of the project, Contractor shall keep the work site clean and free of rubbish and debris. Materials and equipment shall be removed from the site as soon as they are no longer necessary. Upon completion of the work and before final inspections, the entire worksite shall be cleared of equipment, unused materials, and rubbish so as to present a satisfactory, clean, and neat appearance.
All cleanup costs shall be included in the various other items of work, and no additional compensation will be made therefore.
Sanitation
Contractor shall provide and maintain enclosed toilets at a location or locations accessible to and for the use of employees engaged in the work. These facilities shall be maintained in a neat, sanitary condition. They shall comply with all applicable laws, ordinances, and regulations regarding public health and sanitation.
588
RFB 25-26-33, FY 25-26 CAPE SEAL PROJECT
49 61-9 Water for construction
The use of water for any construction purpose shall conform to the provisions of Section 17 of the Standard Specifications and these Special Provisions. Potable water for construction will not be provided by the City of Visalia from existing facilities. The contractor shall make all arrangements to transport and supply water.
Cal Water Service Company operates the water service in the City of Visalia. A meter can be rented from Cal Water for water and shall, at contractor’s own expense, provide facilities for conveying water from a fire hydrant to the point of use. Full compensation for developing, obtaining, and applying water shall be included in the various other items of work, and no additional compensation will be made therefore. 61-10 Testing during construction
Initial tests of materials will be performed at no expense to the Contractor. However, the cost of all retesting required due to failure of the material to meet specifications will be deducted from the money due or that may become due Contractor under contract.
61-11 Certificates of compliance
Contractor shall furnish certificates of compliance for all materials furnished (i.e. that they comply with the Specifications, and with previously approved samples and submittals). 61-12 Contractor's investigation of jobsite
It is the Contractor's responsibility to inspect the jobsite and familiarize himself with all conditions which may affect the work described herein whether or not such conditions are correctly represented or shown on the maps, street lists, plans, specifications and other and Contract Documents. Contractor shall take all such conditions into account in the preparation of his bid and shall provide City with a complete, satisfactory project as specified. Submission of a bid shall indicate the contractor's evidence of jobsite inspections and familiarization with conditions.
61-13 Signs
No advertising signs of any kind will be permitted except by written permission of the City. 61-14 Field office
A field office as such is not required.
61-15 Temporary services
Fences, Barricades, Warning Signs, and Lights
To conform to CAL-OSHA regulations, other State of California and local codes, rules, regulations, and ordinances for protection of workers, public and private property, provide, install and maintain barricades, warning devices and other protection required therefore.
Provide temporary fencing, etc., as required to protect stored materials, equipment and miscellaneous items from theft, vandalism and unauthorized access. Contractor's Access, Work and Storage Areas
Delivery to and removal from the work area of equipment and materials shall be the responsibility of the Contractor.
Telephone
Contractor shall provide cellular telephone service to the site at all times when contract work is being performed. Contractor shall arrange for such telephone service and provide the City with the telephone number.
589
RFB 25-26-33, FY 25-26 CAPE SEAL PROJECT
50 Field Toilets
The Contractor shall furnish, install, and remove at the completion of the job, all sanitary; i.e., portable toilet facilities required for the completion of the job. The type and location of the facilities shall be subject to acceptance by the City.
All sanitary facilities shall be made available for use by all workers, subcontractors, consultants, and City personnel associated with the project.
The Contractor shall maintain the sanitary facilities in a proper, safe, and sanitary condition for the duration of the work. Facilities shall be provided in sufficient quantities to comply with CAL-OSHA regulations.
Existing facilities shall not be used by Contractor's employees or subcontractors. 61-16 Special security requirements
The Contractor's workers and equipment shall be limited to the work areas as designated by this contract, or as directed by the City.
61-17 Disposition of equipment and materials
All waste from this work shall be removed from the site and disposed of at an approved dumpsite location by the Contractor at the Contractor's expense.
SECTION 62 MOBILIZATION
62-1 General
Preparatory Work: Mobilization conforming to Section 11 of the Standard Specifications shall consist of preparatory work and operations, including, but not limited to, those necessary for the movement of personnel, equipment, supplies, and incidentals to the project site; secured equipment and materials storage areas, demobilizations and other facilities necessary for work on the project; and for all other work and operations which must be performed or costs incurred prior to beginning or after work on the various contract items on the project site.
SECTION 63 PERMITS
The job site is located within the City of Visalia. A City of Visalia Business Tax Certificate, which may be obtained at City Hall West (707 W. Acequia Avenue), is required prior to commencement of the project. For more information, please call the Business Tax Division at (559) 713-4326 or [email protected].
An encroachment permit will also be required to work within the City’s right of way. It will be the responsibility of the Contractor to apply for and obtain the encroachment permit from the Encroachment Permit Office ([email protected]). The encroachment permit fees are waived on this City project.
All work embraced herein shall be accomplished in accordance with all applicable Standards, Codes, Regulations, or Specifications issued by any governmental agency having jurisdiction over the work in progress. Contractor shall prepare and deliver to the proper agency any report or records which may be required in connection with the project and obtain any permits which may be required.
Payments for obtaining permits shall be included in the item for Mobilization and shall include full compensation for all labor, materials, equipment, tools, and incidentals required to complete the work as specified herein.
590
RFB 25-26-33, FY 25-26 CAPE SEAL PROJECT
51 SECTION 64 MAINTENANCE AND CONTROL OF TRAFFIC
64-1 General
All traffic control devices and sufficient personnel shall be provided to maintain a safe and orderly flow of traffic around the construction operation.
64-2 Related Information
The following sections contain information and materials relating to this item, except as modified herein:
Caltrans Manual of Warning Signs, Lights, and Devices for Use in Performance of Work upon Highways
City of Visalia Encroachment Permit Policy Manual May 2015 City of Visalia Engineering Standard Specifications
64-3 Materials and Methods
Traffic control devices shall conform to the State of California Department of Transportation (CalTrans) Manual of Warning Signs, Lights, and Devices/or Use in Performance of Work upon Highways, latest revision. Maintenance and control of traffic shall conform to the Standard Specifications for Maintenance of Traffic and Detours, the traffic control requirements of said standard specifications, and to the City's standard specifications for traffic control per the Encroachment Permit Policy Manual. The Contractor shall submit a traffic control plan to the City for approval prior to the initiation of Cape Seal operations (see 64- 5). Contractor shall provide traffic control devices and flagger personnel sufficient to maintain a safe and orderly flow of traffic around the construction operation as approved by the encroachment permit. 64-4 Parking & Notifications & Portable Changeable Message Sign (PCMS) Requirements 64-4.1 Advanced Public Notification
Measure N Signage
The contractor will be required to place Measure N signage at the beginning of the project from all directions on major arterials and major collectors as directed by the City. The signs will be supplied by the City. The contractor will supply the type-3 barricades to install the signs prior to beginning the actual Cape Seal work. The sign installation shall meet the standards for normal traffic control sign standards per the CA State MUTCD. The contractor will be responsible for removing the signage and delivering to the City’s corporation yard upon the completion of the project per the Project Manager’s direction.
Payment for Measure N Signage shall be included in the contract lump sum price for “Measure N Signage” and shall include full compensation for furnishing all labor, materials, tools, equipment and incidentals, and for doing the work needed to install Measure N Signs and as describe in this section.
591
RFB 25-26-33, FY 25-26 CAPE SEAL PROJECT
52 No Parking Notification
Three (3) working days prior to beginning Cape Seal work in an area, the Contractor will deliver City approved written notices to all adjacent residents and businesses and tenants. Copies of notices will be posted by the Contractor on the NO PARKING signs when they are erected or posted.
Notices for Cape Seal work will include the following: a general description of the Cape Seal process, problems associated with the staining of material by the asphalt, the date and approximate time that a particular street is to receive this treatment and a list of other streets included for that day, expected traffic delays, no parking requirements on the street, the possibility of towed cars, and the name, address and phone number of the contractor's superintendent and the City Project Manager. All signs to be provided by the Contractor shall be approved by the Engineer before they are delivered and installed by the Contractor.
Deliver written notices to each affected occupant of adjacent property not less than three (3) working days prior to start of work. Post “No Parking, Tow Away Zone” signs on barricades three (3) working days prior to start of work. Be responsible for maintaining traffic control, as shown on drawings, as the work progresses. Exercise care to ensure the asphalt rubber binder and microsurfacing does not get on the existing gutters, drive approaches, etc. Take care to avoid applying any asphalt rubber binder and micro-surfacing beyond the limits of work.
The Contractor will be responsible for posting "No Parking" signs, with date and time of work at least three (3) working days in advance of construction. Any required removal of parked cars shall be coordinated through the Public Works Department and the City Police Department. Towing fees will be paid by the City. The "No Parking" signs shall be removed immediately once the street can be driven on by the public.
The Contractor will be responsible for noticing all of the residents. Notices will include ContractorCity approved dates for the work and contact information.
The Cape Seal work shall not occur on waste pickup days. It is the Contractor's responsibility to coordinate with the City in this regard.
The Notice will inform all residents not to leave waste containers on the street until the scheduled pick-up day. If waste containers are left on the streets, it shall be the Contractor's responsibility to remove or relocate outside the pavement area adjacent to the residence or business it belongs to or arrange for proper removal of the containers at no additional cost to the City. Likewise, if the City must return for pick-up due to unscheduled Contractor activity, any additional charges shall be the responsibility of the Contractor.
The contractor will also notify the following agencies:
Visalia Transit
U.S. Postal Service
Emergency Services
School Districts
Utility Companies
Payment for notifications as described in this section shall be included in the contract price for the respective Cape Seal Project Area and shall include full compensation for furnishing all labor, materials, tools, equipment and incidentals, and for doing the notifications as describe in this section. 592
RFB 25-26-33, FY 25-26 CAPE SEAL PROJECT
53 64-4.2 Portable Changeable Message Sign (PCMS) Requirements Portable Changeable Message Signs (PCMS) shall be installed on all Collector and Arterial streets approaching entrances to subdivisions where work will be carried out or where lane restrictions, lane closures or road closures will occur. Other streets may require PCMS as directed by the City of Visalia depending on the proposed phasing of work or field conditions. PCMS shall be installed prior to construction in advance of the direct project area on each approaching roadway indicating the start and end dates of construction as follows:
1. PCMS shall be installed a minimum of three (3) working days in advance of roadway restrictions and advance notice of a project.
2. PCMS shall be installed a minimum of seven (7) working days in advance of roadway closures.
3. PCMS shall be installed as directed by the City Engineer.
All PCMS shall remain in place until construction starts on the affected street. The wording shown on the PCMS shall be as follows for the following situations:
Closure Situation:
ROAD
CLOSED
AHEAD
BEGINNING DATE
TO
END DATE
USE
POSTED
DETOUR
Lane Restriction Situation:
ROAD
WORK
AHEAD
BEGINNING DATE
TO
END DATE
EXPECT
DELAYS
Commencing Work Situation:
ROAD
WORK
STARTS
BEGINNING DATE
TO
END DATE
EXPECT
DELAYS
The contractor shall be responsible for the placement of any PCMS and all other devices necessary as required by the California MUTCD to assure safety to the public at all times during construction.
Each PCMS shall have the proper traffic control measures in advance of each location to alert motorists of a potential obstruction in the roadway. Traffic lanes or sidewalks shall not be obstructed by the PCMS unless approved by the City of Visalia. The Contractor shall check the PCMS daily to ensure they are functioning properly with the appropriate message. The contractor shall repair or replace any PCMS that is not functioning properly within four (4) hours of being notified.
All costs for providing all PCMS as specified herein shall be included in the lump sum price bid for Portable Changeable Message Signs (PCMS).
Payment for PCMS signs shall be included in the lump sum contract price bid item for Portable Changeable Message Signs (PCMS) and shall be compensation in full for furnishing all overhead, labor, materials, tools, equipment, and appurtenances necessary to complete the work in accordance with the requirements of the contract documents. No additional payment will be made for work incidental to each item unless specifically noted.
593
RFB 25-26-33, FY 25-26 CAPE SEAL PROJECT
54 64-5 Traffic Control
The Contractor shall submit an application for an encroachment permit with fully detailed traffic control plans for City approval. The encroachment permit and plans shall be submitted at the latest, by the time of the pre-construction meeting. Due to the time it takes to review the encroachment permit and traffic control plans, these should be submitted as soon as possible.
The plan shall incorporate:
The proposed schedule, including times-of-day, for Chip Seal application, Micro-Surfacing application, striping and sweeping to maintain maximum access to adjacent properties for all streets.
The Contractor shall schedule his operations and carry out the work in a manner to cause the least disturbance and/or interference with the normal flow of traffic over the areas to be treated. Treated portions of the pavement surfaces shall be kept closed and free from traffic until penetration, in the opinion of the Engineer, has become complete and the area is suitable for traffic.
The timing of work for these streets, and the maintenance of half-street access as required to accommodate through street traffic flows and business and commercial access during business hours shall be scheduled and provided to the City's satisfaction.
Provision of written notice each work day to the City's Project Manager of the access, egress, and traffic diversions proposed for the following work day, to allow traffic control provisions to be timely discussed and to provide timely notification to the police and fire departments, Postal Service, school districts and transit facilities.
The Contractor shall place proper detour signs, barricades, flagmen, cones, and other warning devices prior to the work each day.
These additional requirements in no way relieve the Contractor from its obligation to comply with the other standards set forth in Section 37 of the Caltrans Standard Specifications. ROAD WORK AHEAD (C23) signs shall be placed on all public road approaches to any project site before any work commences on the sites. FRESH OIL (W21-2), 15 MPH (W13-1P) and LOOSE GRAVEL (W8-7) signs shall be used on all streets receiving the seal. These signs shall be maintained for the duration of construction, including sweeping, and shall be removed once construction and sweeping are complete.
FRESH OIL (W21-2), 15 MPH (W13-1P) and LOOSE GRAVEL (W8-7) signs shall be furnished and placed adjacent to both sides of the traveled way on each block. Additional signs shall be placed at a maximum of 500-foot intervals and at public roads entering the seal coat area. All signs shall conform to the requirements for construction area signs in Section 12, "Construction Area Traffic Control Devices," of the Standard Specifications.
Maintain at least half street through access at all times on all streets (except cul-de-sacs 300 feet or less in length) including all streets providing sole access to abutting properties.
Provide flagmen, signs or lights, as required, to assure that damage does not occur to fresh seal coat or traffic markings.
Take all feasible steps to minimize project impacts upon traffic flows, access and egress while protecting workers and work in progress.
594
RFB 25-26-33, FY 25-26 CAPE SEAL PROJECT
55 Respond promptly and effectively to any traffic safety, access and egress concerns expressed by the Engineer or the City's Representative and by local public safety (police and fire) personnel, inside and outside of normal business hours.
The Contractor shall be totally responsible for traffic control. Failure or refusal to construct and maintain detours and controls at the proper time shall be sufficient cause for closing down the work until such detours and controls are in satisfactory condition for safe use by the public.
If, in the opinion of the Engineer, proper signing is not being used, the Contractor shall stop all operations until safe signing and barricading is achieved.
Bring all discrepancies to the immediate attention of the City Engineer. 64-6 Measurement and Payment
Payment for traffic control shall be included in the lump sum contract price bid item for Traffic Control and shall be compensation in full for furnishing all overhead, labor, materials, tools, equipment, and appurtenances necessary to complete the work in accordance with the requirements of the contract documents. No additional payment will be made for work incidental to each item unless specifically noted.
SECTION 65 CAPE SEAL
65-1 General Description of the Work
This work shall consist of furnishing all labor, material, and equipment necessary to perform all operations for the application of the asphalt maintenance process involved in Cape Seal. All work shall be in accordance with these specifications, the applicable maps and street lists, and subject to the terms and conditions of this contract.
This Cape Seal Project shall consist of a Chip Seal application followed by a Micro-Surfacing application as specified in these specifications.
65-2 Pre-Qualification
The Contractor shall have had a minimum experience of five (5) projects in the application of Cape Seals or be capable of demonstrating sufficient technical expertise in the application of Cape Seals and have successfully completed projects to the satisfaction of their clients.
SECTION 66 CHIP SEAL CONSTRUCTION METHOD
66-1 General
This Chip Seal consists of applying an asphalt-rubber binder seal followed by heated cover material precoated with asphalt binder. Therefore, the Chip Seal method shall be generally comprised of the following tasks:
Surface Preparation
Application of an asphalt-rubber binder seal coat
Application of aggregate cover material (screenings)
595
RFB 25-26-33, FY 25-26 CAPE SEAL PROJECT
56 The Contractor shall exercise care to prevent oil from being deposited on concrete surfaces. The Contractor shall remove oil each day from the surfaces not designated to be cape sealed. No additional streets shall be Chip sealed until this cleanup has been performed. The Engineer shall approve the method of the oil removal.
Contractor shall install temporary raised pavement markers once the chip seal is cured until the roadway surface is ready for permanent raised pavement markers.
Contractor shall wait a minimum of fourteen (14) days between application of Chip Seal and MicroSurfacing. 66-2 Surface Preparation
Immediately prior to the application of the asphalt-rubber binder, the surface shall be thoroughly cleaned in order to ensure adequate adhesion of the asphalt-rubber binder to the existing pavement surface.
The Contractor shall remove any vegetation within the limits of the surface treatment by applying an approved herbicide. The herbicide shall be applied at least ten (10) days prior to the surfacing operation or as directed by the manufacturer of the approved herbicide. Reward and Round-Up are pre-approved herbicides. All other herbicides shall be submitted by the Contractor for approval by the agency and shall be certified for use in the State of California for the specific use intended. The application of the herbicide shall be performed in accordance with all applicable regulations. Any and all fines or clean-up costs for unlawful misuse or discarding of herbicides shall be the sole responsibility of the Contractor. Mixtures and spread rates for the herbicides shall be determined by the manufacturer's specifications. Wash down of equipment or discarding of herbicides shall not enter the catch basins or other drainage facilities.
Remove all existing thermoplastic striping, thermoplastic legends and raised pavement markers within the surfacing limits. When removing the raised pavement markers, the Contractor shall remove excess adhesive left on pavement caused from the removal of raised pavement markers. If excessive pavement damage occurs from the removal of raised pavement makers, the damage shall be repaired by filling with patching material.
Removal shall be done to the satisfaction of the Engineer.
Immediately prior to the Surfacing operations, the Contractor shall sweep the entire surface with vacuum-assisted power brooms. The equipment used by the contractor for pavement cleaning and excess aggregate removal shall include a self-propelled rotary power broom, mobile pick-up broom or top dumping mobile pick-up broom.
Before asphalt-rubber binder placement, all covers, drain inlet covers, monument covers, and all other utility covers shall be protected from the Contractors surfacing operations by applying a sheet of plastic, cut to fit, or placing a plastic bag over the exposed facilities or other methods approved by the Engineer.
All traces of plastic and excess surfacing material shall be removed from all covers of facilities and other utility covers as quickly as possible after the application of the Chip Seal before opening roadway to traffic.
Plastic will need to be re-installed before micro-surfacing operations. 66-3 Asphalt-Rubber Binder
After preparation of roadway surface, the asphalt rubber binder shall be applied as the next step of the chip seal process. The asphalt-rubber binder itself shall be a mixture of the following components:
596
RFB 25-26-33, FY 25-26 CAPE SEAL PROJECT
57 Asphalt Cement
Asphalt Modifier
CRM (Crumb Rubber Modifier)
66-3.1 Asphalt Cement
The type and grade of asphalt cement utilized to manufacture the asphalt-rubber binder shall be Performance Graded (PG) asphalt cement, PG 64-10 or PG 70-10. See the following table for asphalt cement requirements.
Table #1
PG Asphalt Binders
Quality characteristic Test method Requirement
597
RFB 25-26-33, FY 25-26 CAPE SEAL PROJECT
58 PG
58-22a
PG
64-10
PG
64-16
PG
64-28
PG
70-10
Original Binder
Flash point (min, °C) AASHTO T 48 230 230 230 230 230
Solubility b (min, %) AASHTO T 44 99 99 99 99 99
Viscosity at 135 °Cc
(max, Pa•s)
AASHTO T 316 3.0 3.0 3.0 3.0 3.0
Dynamic shear
Test temperature at 10 rad/s
(°C)
G*/sin(delta) (min, kPa)
G*/sin(delta) (max, kPa)
AASHTO T 315 58
1.00 2.00
64 1.00
2.00 64
1.00 2.00
64 1.00
2.00 70
1.00 2.00
RTFOf teste
mass loss (max, %)
AASHTO T 240 1.00 1.00 1.00 1.00 1.00
RTFOf Test Aged Binder
Dynamic shear
Test temperature at 10 rad/s
(°C)
G*/sin(delta) (min, kPa)
AASHTO T 315 58
2.20 64
2.20 64
2.20 64
2.20 70
2.20 Ductility at 25 °C (min, cm) AASHTO T 51 75 75 75 75 75 PAVg
Test temperature (°C)
AASHTO R 28 100 100 100 100 110
RTFOf Test and PAVg Aged Binder
Dynamic shear,
Test temperature at 10 rad/s
(°C)
G*sin(delta) (max, kPa)
AASHTO T 315 22d
5000
31d
5000
28d
5000
22d
5000
34d
5000
Creep stiffness,
Test temperature, °C
S-value (max, MPa)
M-value (min)
AASHTO T 313 -12
300
0.300
0 300
0.300
-6
300
0.300
-18
300
0.300
0 300
0.300
a Use as asphalt rubber base stock for high mountain and high desert area. b The Engineer waives solubility requirements if the supplier is an authorized material source as defined by the Department's Certification Program for Suppliers of Asphalt. c The Engineer waives this specification if the supplier provides written certification the asphalt binder can be adequately pumped and mixed at temperatures meeting applicable safety standards. d Test the sample at 3 °C higher if it fails at the specified test temperature. G*sin(delta) remains 5000 kPa maximum.
e The residue from mass change determination may be used for other tests. f RTFO means rolling thin film oven.
g PAV means Pressure Aging Vessel.
66-3.2 Asphalt Modifier
The asphalt modifier will be a resinous, high flash point, aromatic hydrocarbon compound and shall conform to the requirements in Table #2.
Table #2
Asphalt Modifier Requirements
598
RFB 25-26-33, FY 25-26 CAPE SEAL PROJECT
59 Test Parameter ASTM Designation Requirement
Viscosity, cSt. At 212° F (100° C) D 445 X +/- 3 •
Flash Point, COC, degrees F (C) D 92 410˚ F (210˚ C) minimum Molecular Analysis: Asphaltenes,
percent by mass
D 2007 0.1 maximum
Aromatics, percent by mass D 2007 55 minimum
The symbol “X” is the viscosity of the asphalt modifier the Contractor proposes to furnish. The Value of “X” which the Contractor proposes shall be between 19 and 36 and shall be submitted in writing to the assigned City Project Manager. Any proposed changes to these requirements requested by the Contractor, in the value “X” shall require a new asphalt-rubber binder design. 66-3.3 Crumb Rubber Modifier (CRM)
The CRM used shall be produced primarily from the processing of automobile and truck tires. The rubber shall be produced by ambient temperature grinding processes only. Two types of CRM shall be used on this project; Reclaimed Tire Rubber (“scrap tire”) CRM and High Natural Rubber CRM.
The high natural CRM shall consist of ground or granulated rubber derived from materials that utilize high natural rubber sources. The gradation of both types of CRM when tested in accordance with CA Test 385 (dry sieve only) and using a 100-gram sample, shall meet the requirements in Table #3.
Table #3
CRM Grading Requirements
Sieve Size Reclaimed Tire CRM
Percent Passing
High Natural CRM
Percent Passing
#8 (2.36 mm) 100 100
#10 (2 mm) 98 - 100 100
#16 (1.18 mm) 45 - 75 95 - 100
#30 (600 m) 2 - 20 35 - 85
#50 (300 m) 0 - 6 10 - 30
#100 (150 m) 0 - 2 0 - 4
#200 (75 m) --- 0 - 1
The use of CRM from multiple sources is acceptable provided that the overall blend of rubber meets the gradation requirements.
The individual CRM particles, irrespective of diameter, shall not be greater in length than 3/16 of an inch (5mm).
The CRM shall have a specific gravity of between 1.10 and 1.2 as determined by California Test 208, and shall be free of loose fabric, wire and other contaminants except that up to 3 percent (by weight of rubber) calcium carbonate or talc may be added to prevent the rubber particles from sticking together. If calcium carbonate or talc is added, it must first be discussed and approved by the City Engineer. The rubber shall be sufficiently dry so as to be free flowing and not produce a foaming problem when blended with the hot asphalt cement. The CRM shall be accepted by certification from the rubber supplier. The Reclaimed Tire 599
RFB 25-26-33, FY 25-26 CAPE SEAL PROJECT
60 CRM material shall conform to the chemical analysis in Table # 4 and the High Natural Rubber CRM shall conform to the chemical analysis in Table #5.
Table #4
Reclaimed Tire CRM Chemical Requirements
Test ASTM Test
Method
Minimum Maximum
Acetone Extract D 297 6.0 % 16.0 %
Ash Content D 297 8.0 % ----
Carbon Black Content D 297 28.0 % 38.0 %
Rubber Hydrocarbon D 297 42.0 % 65.0 %
Natural Rubber Content D 297 22.0 % 39.0 %
Table #5
High Natural Rubber CRM Chemical Requirements
Test ASTM Test
Method
Minimum Maximum
Acetone Extract D 297 4.0 % 16.0 %
Rubber Hydrocarbon D 297 50.0 % ----
Natural Rubber Content D 297 40.0 % 48.0 %
66-3.4 Asphalt-Rubber Binder Mixture
The percentage of asphalt cement mixed with asphalt modifier shall be 79 ± 1 percent by weight of the total Asphalt-Rubber Binder Mixture. The percentage of CRM shall be 21 ± 1 percent by weight of the total Asphalt-Rubber Binder Mixture.
The asphalt binder mixed with the asphalt modifier shall have the following proportions:
2.5 to 6.0 percent by weight of asphalt modifier
94.0 to 97.5 percent by weight of asphalt cement
The exact percentage shall be determined by the binder design submitted by the asphalt-rubber binder supplier.
The CRM shall have the following proportions:
24 ± 2 percent by weight of high natural rubber CRM
76 ± 2 percent by weight of reclaimed tire rubber (scrap) CRM The exact CRM content shall be determined by the binder design submitted by the asphalt-rubber binder supplier. During membrane placement the CRM percentage shall not fluctuate by more than 1 (one) percent by weight of total asphalt-rubber binder mixture.
The temperature of the asphalt cement and asphalt modifier mix (asphalt mix) shall be between 375 F and 440 F (190 C and 227 C) at the addition of the CRM. The asphalt mix and the CRM shall be combined and mixed together homogenously in the asphalt-rubber blending unit and reacted in the distributor or a reaction vessel for a minimum period of 45 minutes from the time the CRM is added to the asphalt mix. The temperature of the asphalt-rubber binder mixture shall be above 375 (190 C) during the reaction period but shall not exceed 425 F (219 C) at any time. Exceeding the 440 F (227 C) limit will be grounds for rejection of the affected binder material.
600
RFB 25-26-33, FY 25-26 CAPE SEAL PROJECT
61 The asphalt-rubber binder shall meet the following criteria in Table #6, when the reaction is complete.
Table #6
Specification Limits for Asphalt-Rubber Binder
Quality characteristic Test method Requirement
Cone penetration at 25 °C
(0.10 mm) ASTM D217 25–60
Resilience at 25 °C (%
rebound) ASTM D5329 18–50
Softening point (°C) ASTM D36/D36M 55–88
Viscosity at 375 °F (Pa•s
x 10-3)a ASTM D7741/D7741M 1,500–2,500
a Prepare sample for viscosity test under California Test 388.
The viscosity shall be conducted by using a hand held HAAKE VISCOMETER: Model VT-02 with rotor 1, 24mm in depth x 53mm in height, or equivalent. The reacted asphalt-rubber binder shall be maintained at a temperature of not less than 375° F (190° C) and not more than 425° F (219° C).
If any of the material in a batch of asphalt-rubber binder is not used with-in four hours after the reaction period is complete, heating of the material shall be discontinued. When the asphalt-rubber binder temperature cools below 375° F (190° C) and is then reheated, it shall be considered a reheat cycle. The total number of reheat cycles shall not exceed two (2). The binder material shall be uniformly reheated to a temperature of not less than 375° F (190° C). Additional scrap tire CRM may be added to the reheated asphalt-rubber binder and reacted for a minimum of 45 minutes and shall not exceed 10 percent of the total binder weight. Reheated asphalt-rubber binder shall conform to the requirements for blended asphalt-rubber. 66-3.5 Asphalt-Rubber Binder Formula Submittals
The asphalt-rubber supplier shall furnish to the assigned City Project Manager within 15 days of the Notice to Proceed, the asphalt-rubber binder formulation which shall contain the following information:
Asphalt Cement
Source of Asphalt Cement
Grade of Asphalt Cement
Percentage of Asphalt Cement by total weight of asphalt-rubber mixture Asphalt Modifier
Source of Modifier
Grade of Modifier
Percentage of Modifier by total weight of asphalt-rubber mixture Reclaimed Tire Rubber (CRM)*
Source of CRM
601
RFB 25-26-33, FY 25-26 CAPE SEAL PROJECT
62 Grade of CRM
Percentage of CRM by total weight of the asphalt-rubber mixture High Natural Rubber (CRM)*
Source of CRM
Grade of CRM
Percentage of CRM by total weight of the asphalt-rubber mixture *If CRM from more than one source is to be utilized, then the above information will be required for each type and source of CRM used.
66-3.6 Application of Asphalt-Rubber Binder
Asphalt-rubber binder material shall be applied only when the existing surface is dry and the atmospheric temperature is above 55 F (13 C) and rising. Generally, asphalt-rubber binder shall be blended only under the following conditions:
1. The pavement surface temperature shall be 55 F (13 C) and rising
2. The pavement surface is clean and dry
3. The wind conditions are not excessive
4. All of the construction equipment such as the asphalt-rubber distributor, aggregate spreader, and haul trucks loaded with cover material, rollers and brooms are in position and ready to commence placement operations.
5. Rain is not imminent.
The asphalt-rubber mixture shall be applied to the roadway immediately following mixing and reaction at a temperature of 385 F to 415 F (176C to 231 C) at a rate of 0.55 to 0.65 gallons per square yard.
Transverse joints shall be constructed by placing building paper across and over the end of the previous asphalt-rubber application. Once the application has progressed beyond the paper, the paper shall be removed immediately and disposed of as directed by the engineer. The use of paper may be discontinued if the Contractor chooses to squeegee the excess asphalt-rubber binder material at the transverse joints prior to the placement of the cover aggregate. All longitudinal joints shall not exceed a 12-inches (30 cm) overlap.
Distributor bar height, distribution, speed and shielding materials shall be utilized to reduce the effects of excess wind upon the spray distribution (fan). The Engineer shall delay or reschedule work when high gusting or dirty winds prevent or adversely affect asphalt-rubber binder or cover aggregate application.
The application of asphalt-rubber binder to areas not accessible with the distributor bar on the distributor truck shall be accomplished by using pressurized hand wands or other means approved by the engineer.
The contractor shall comply with all federal, State and Local environmental laws, regulations and ordinances including, but not limited to, air quality requirements. 66-3.7 Equipment
All equipment utilized in the production and application of asphalt-rubber binder materials shall meet the requirements herein. Equipment shall include, but not be limited to:
602
RFB 25-26-33, FY 25-26 CAPE SEAL PROJECT
63 An asphalt cement heating tank with a hot oil heat transfer system or a retort heating system capable of heating the asphalt cement and asphalt modifier to the proper temperature for blending with the CRM.
An asphalt-rubber mechanical blender shall have a two stage continuous mixing process capable of producing a homogenous blend of asphalt mix and CRM, at the mix design specified ratios, as directed by the engineer. This unit shall be equipped with a granulated rubber feed system capable of supplying the asphalt cement feed system, as not to interrupt the continuity of the blending process.
The maximum capacity of the primary blending vessel shall be 500 gallons (1900 liters). Both the primary and secondary blenders shall be equipped with an agitation device orientated horizontally in the blending vessel. The blending unit shall be capable of fully blending the individual rubber particles with the asphalt cement. A separate asphalt cement feed pump and finished product pump are required. This unit shall have an asphalt cement totalizing meter in gallons and a flow rate meter in gallons per minute.
A trailer mounted self-powered distributor truck equipped with a heating unit, and an internal mixing device capable of maintaining a uniform mixture of asphalt mix and CRM. It shall be equipped with a full circulating spreader bar and pumping system capable of applying asphalt-rubber material within 0.05 gallons per square yard tolerance of the specified application rate, and must achieve a uniform covering of the surface to be treated. The distributor shall have a boot board on the rear of the vehicle and a bootman shall accompany the distributor. The bootman shall ride in a position so that all the spray bar tips are in full view and readily assessable for unplugging, if a plugged tip should occur. The distributor shall also include a tachometer, pressure gauge, a volume-measuring device, thermometer and shall also have a computer rate control (CRC) installed.
66-4 Aggregate Cover Material (screenings)
Aggregate cover material shall be immediately applied to the roadway surface after the application of the asphalt-rubber binder. The aggregate cover material shall be composed of adequate aggregate material precoated with PG asphalt binder. 66-4.1 Material
Aggregate shall be black or gray and composed of clean and durable crushed rock or crushed gravel conforming to the following requirements:
Precoated Screenings Acceptance Criteria
Quality characteristic Test method Requirement
603
RFB 25-26-33, FY 25-26 CAPE SEAL PROJECT
64 Los Angeles Rattler Loss
(max, %)
Loss at 100 revolutions
Loss at 500 revolutions
California Test 211 10
40 Film stripping (max, %) California Test 302 25
Cleanness value (min) California Test 227 80
Durability (min) California Test 229 52
Proposed aggregate samples shall be submitted to the asphalt-rubber supplier prior to the preparation of the mix design to test the aggregate for stripping characteristics. All testing results shall be submitted to the assigned City Project Manager.
If the aggregate is to be crushed stone, it shall be manufactured from sound, hard, durable material of quality accepted by the City Engineer and crushed to specification size. All strata, streaks and pockets of clay, dirt, sandstone, soft rock or other unsuitable material accompanying the sound rock shall be discarded and not allowed to enter the crusher.
If the aggregate material is to be crushed gravel, it shall consist of hard, durable fragments of stone or gravel of accepted quality and crushed to specification size. All strata, streaks, pockets of sand, excessively fine gravel, clay or other unsuitable material including all stones, rocks and boulders of inferior quality shall be discarded and not allowed to enter the crusher. The crushing of the gravel shall separate the #4, 3/8, and ½ inch (4.75, 9, and 12 mm) sieves and shall have a minimum 95% of the particles with a minimum of one fractured face and 90% of the particles shall have a minimum of two fractured faces.
The crushed aggregate shall not contain more than 8% by weight of flat or elongated pieces and shall be free from wood, roots and vegetable or other organic extraneous matter. The crushed coarse aggregate shall have a percentage of wear not more than 10 at 100 revolutions and not more than 40 at 500 revolutions, as determined by California Test # 211.
Film Stripping will be determined according to California Test #302 and shall not exceed 25. Cleanness Value will be determined according to California Test #227 and shall have a minimum value of 80. The Durability will be determined according to California Test #229 and shall have a minimum value of 52.
The aggregate shall show no evidence of disintegration nor show a total loss greater than 12% when subjected to 5 cycles of the sodium sulfate accelerated soundness test specified in ASTM C88.
The crushed aggregate for asphalt rubber applications shall meet the requirements for gradation given in Table 7, when tested in accordance with ASTM C136.
Table #7
Aggregate Gradation Requirements
604
RFB 25-26-33, FY 25-26 CAPE SEAL PROJECT
65 3/8 inch SAM (Strain Alleviating Membrane) &
SAMI (Strain Alleviating Membrane Interlayer)
Aggregate Gradation
Sieve Size Percent Passing
3/4 inch (15 mm) 100
½ inch (12 mm) 95-100
3/8 inch (9 mm) 70 - 85
1/4 inch (4.75 mm) 0 - 15
#8 (2.36 mm) 0 - 5
#200 (75 m) 0 - 1
The aggregate shall be hot pre-coated with 0.5 to 1.0 percent of paving grade asphalt cement. The City Engineer shall determine the appropriate amount of pre-coat. The pre-coated aggregate shall have a “salt and pepper” appearance and when used hot shall be supplied to the project site at 250 F to 325 F (121 C to 162 C).
66-4.2 Application of Aggregate Cover Material (Screenings) Aggregate cover material shall be applied immediately onto the asphalt-rubber binder, after application, at a rate of 28 to 40 pounds per square yard. The actual amount selected within this range will be determined in the field based on the appearance of the SAM after initial rolling. At all times the application rate shall be kept to a minimum.
At the time of application, when using hot pre-coated aggregate, the temperature of the aggregate shall range from 225 F to 325 F (121 C to 162 C)
66-4.3 Equipment
Trucks for hauling the aggregate cover material shall be tailgate discharge and shall be equipped with a device to lock onto the hitch of the cover material spreader. Haul trucks shall also be compatible with the cover aggregate spreader so that the dump bed will not push down on the spreader when fully raised, or have too short of a bed which results in aggregate spillage while dumping into the receiving hopper.
The cover material (chip) spreader shall be a self-propelled machine with an aggregate receiving hopper in the rear, belt conveyors to carry the pre-coated aggregate to the front, and a full width spreading hopper.
The spreader shall be in good mechanical condition and be capable of applying the aggregate cover uniformly across the spread width, and at the specified application rate. When utilizing the hot pre-coated aggregate, heat-treated belts should be installed on the spreader.
The mixture shall be agitated and spread uniformly in the surfacing box by means of twin shafted paddles or spiral augers fixed in the spreader box. At the discretion of the Engineer, a non-auger baffle box may be used. A front seal shall be provided to ensure no loss of the mixture at the road contact point. The rear seal shall act as a final strike-off and shall be adjustable. The spreader box and rear strike-off shall be designed 605
RFB 25-26-33, FY 25-26 CAPE SEAL PROJECT
66 and operated so that a uniform consistency is achieved to produce a free flow of material to the rear strikeoff. The spreader box shall have suitable means provided to side shift the box to compensate for variations in the pavement geometry.
66-4.4 Rolling
A minimum of three operational self-propelled pneumatic-tired rollers, and one steel-wheel roller, shall be used for the required rolling of the cover material. The pneumatic-tired rollersshall carry a minimum loading of 3,000 pounds (1361 kg) on each wheel at a minimum pressure of 90 pounds per square inch in each tire.
Usage of the steel wheel roller should be based on the hardness value of the aggregate material.
Sufficient rollers shall be used for the initial rolling to cover the width of the aggregate spread with one pass, and to accomplish the required embedment of the aggregate cover material. The first pass shall be made immediately behind the cover material spreader as the aggregate is being placed. If the spreading is stopped for an extended period, the cover material spreader shall move ahead or off to the side so that all cover material may be immediately rolled. Three complete passes with rollers shall be made with the pneumatic rollers for all streets. For arterials and collector streets, one pass with the steel wheel roller is required or to the satisfaction of the City.
At some project locations, or when production rates dictate, additional or fewer rollers may be utilized as directed by the engineer. At no time shall there be less than 3 (three) operational pneumatic-tired rollers and 1 (one) 12 to 14 ton operational steel wheel roller on the project. 66-4.5 Sweeping
The Contractor shall be responsible for sweeping and cleaning of the streets prior-to and after treatment.
The equipment used by the contractor for pavement cleaning and excess aggregate removal shall include a self-propelled rotary power broom, mobile pick-up broom or top dumping mobile pick-up broom All sand used during the treatment must be removed no later than 24 hours after treatment of the street. This shall be accomplished by mechanical sweeping. All streets must be cleaned of any material to the satisfaction of the Engineer.
If, after sand is swept and in the opinion of the Engineer a hazardous condition exists on the roadway, the contractor must apply additional sand and sweep same no later than 24 hours following sand removal. No additional compensation will be allowed for reapplication and removal of sand. 66-5 Traffic
Except when it is necessary that hauling equipment must travel on the newly applied SAM, traffic of all types shall be kept off the application until it has had time to set properly. The speed of the hauling equipment shall not exceed 15 miles per hour (24 kilometers per hour) when traveling over an application that has not had sufficient time to properly set.
66-6 Payment
Payment for the Asphalt-Rubber Chip Seal shall include full compensation for furnishing labor, materials, equipment, and incidentals, vegetation removal, sweeping, and all work involved in mixing, applying, and protecting the asphalt-rubber chip seal until it has set as shown on the maps, street lists, the standard 606
RFB 25-26-33, FY 25-26 CAPE SEAL PROJECT
67 specifications, and these special provisions and as directed by the engineer. Asphalt-Rubber chip seal shall be measured and paid for by square yards on the work completed and accepted by the City of Visalia.
SECTION 67 MICRO-SURFACING
67-1 General
The Contractor shall furnish all labor, equipment, material, supplies, signage, traffic control, and other incidentals necessary to provide Micro Surfacing. Micro Surfacing shall consist of a mixture of an approved aggregate, polymer-modified emulsified asphalt, mineral filer, water, and specified additives, proportioned, mixed and uniformly spread over a properly prepared asphalt surface. The completed Micro Surfacing shall leave a homogeneous mat, adhere firmly to the prepared surface, and have a skid-resistant surface texture throughout its service life.
67-2 Surface Preparation
Micro-surfacing shall not be applied onto the roadway surface until 14 days minimum after the chip seal has been installed.
Immediately prior to applying the Micro Surfacing, the surface shall be cleared of all loose material, oil, debris, grease spots, vegetation and other objectionable material. Any standard cleaning method will be acceptable. If water is used, cracks shall be allowed to dry thoroughly before Micro Surfacing.
All utility covers, drain inlets, manholes, valve boxes, survey monuments and other service entrances shall be protected from the Contractors surfacing operations by applying a sheet of plastic, cut to fit, or placing a plastic bag over the exposed facilities or other methods approved by the Engineer. 67-3 Micro-Surfacing Material
The micro-surfacing material for this project shall consist of the following:
Aggregate
Emulsified Asphalt
Mineral Filler
Specified Additives
Water
67-3.1 Aggregate
The aggregate shall consist of manufactured granite crusher fines. The smooth textured crusher fines shall have less than 1.25% water absorption. The aggregate shall be black or gray in color and clean and free from organic matter, other deleterious substances and clay balls. Oversized granular material and/or presence of clay balls will require the project to be stopped and shall meet the following requirements:
Gradation Table – Aggregate (percent passing)
Sieve Size Type II Tolerance
3/8” 100
607
RFB 25-26-33, FY 25-26 CAPE SEAL PROJECT
68 No.4 94-100 + or - 5%
No. 8 65-90 + or - 5%
No. 16 40-70 + or - 5%
No. 30 25-50 + or - 5%
No. 50 18-30 + or - 4%
No. 100 10-21 + or - 3%
No. 200 5-15 + or - 2%
• Resistance to Degradation (ASTM C131grading D) 20% maximum loss • Soundness of Aggregate
• Sand Equivalent Value
(ASTM C88)
(ASTM D2419A)
15% maximum loss
55 minimum
• LA Abrasion (AASHTO T96) 20% maximum loss
The aggregate shall also comply with the following requirements:
Micro-Surfacing Aggregate
Quality characteristic Test Method Requirement
Sand equivalent (min) California Test 217 65
Durability index (min) California Test 229 65
Percentage of crushed
particles (min, %)a California Test 205 95
Los Angeles Rattler
Loss at 500 revolutions
(max, %)b
California Test 211 35
a Crushed particles must have at least 1 fractured face. b California Test 211 must be performed on the aggregate before crushing. 67-3.2 Emulsified Asphalt
The emulsion for Micro Surfacing shall be Emulsified Asphalt (CQS-1P) conforming to CDOT Table 702-
12. The modified emulsion shall contain a minimum of 3% polymer, SBR latex, or natural latex by weight, with the following properties:
Test on Emulsion Minimum Maximum AASHTO Test
Viscosity, Say bolt Furol, 25 C (77 F),s 15 90 T-59
Storage Stability Test, One day, % 1 T-59
608
RFB 25-26-33, FY 25-26 CAPE SEAL PROJECT
69 Particle Charge Test Positive
Sieve Test, %(a) 0.3 T-59
Distillation:
Oil distillate, by volume, % - .5 T-59
Residue by evaporation, % 62* - T-59
Test on Residue from Distillation:
Penetration, 25 C (77 F), 100g (.22 lbs), 5s 40 90 T-49 Ductility, 25 C (77 F), 50 mm (2”) / sec 50 - T-51
Solubility in Trichloroethylene, % 97 - T-44
Softening Point, Ring-and-Ball, C (F) 57.2 (135) - T-53 *The standard distillation procedure shall be modified as follows:
The temperature on the lower thermometer shall be brought slowly to 350 F +/- 20 F and maintained at this point for 20 minutes. The total distillation shall be completed in 60+/- 5 minutes from the first application of heat.
67-3.3 Mineral Filler
Hydrated lime, cement, or other approved filler meeting the requirements of ASTM D242 shall be used if required by the mix design. They shall be considered as part of the dry aggregate. Fillershall be of the specific type specified in the mix design.
67-3.4 Additives
Additives may be used to accelerate or retard the break-set of the Micro Surfacing or to improve the resulting finished surface. The use of additives in the Micro Surfacing mix (or individual materials) shall be made initially in quantities predetermined by the mix design with field adjustments, if required, after approval by the Project Manager.
67-3.5 Water
All water used shall be potable and free of dissolved materials which may affect the mix characteristics or finished characteristics of the product.
67-4 Micro Surfacing Mix Design
Before work begins, the Contractor shall submit a mix design covering the specific materials to be used on the project. The manufacturer of the polymer modified emulsion shall develop the job mix formula and present certified test results for the Contractor's approval. Compatibility of the aggregate and polymer modified emulsified asphalt shall be certified by the emulsion manufacturer. The mix design shall be in accordance with the ISSA TB-136 Wet Track Abrasion Loss, Six Day Soak with a maximum loss of 75 grams/sf. The emulsion supplier shall also provide a base line of emulsion to the owner for testing of latex percentages. The Micro Surfacing mixture shall meet the following specifications:
ISSA TEST NO. DESCRIPTION SPECIFICATION
609
RFB 25-26-33, FY 25-26 CAPE SEAL PROJECT
70 ISSA TB-113 Mix Time at 77°F Controllable to 120 seconds Minimum
ISSA TB-114 Wet Stripping Pass (90% Minimum)
ISSA TB-139
Wet Cohesion
@ 30 Minutes Minimum (Set)
@ 60 Minutes Minimum (Traffic)
12 kg-cm Minimum
20 kg-cm or Near Spin Minimum
ISSA TB-100
Wet-Track Abrasion Loss
One-hour Soak
Six-day Soak
50 g/ft2 (538 g/m2) Maximum
75 g/ft2 (807 g/m2) Maximum
ISSA TB-147
Lateral Displacement
Specify Gravity after 1,000 Cycles of
125 lb (56.71 kg)
5% Maximum
2.10 Maximum
ISSA TB-109 Excess Asphalt by LWT Sand Adhesion 50 g/ft2 (538 g/m2) Maximum ISSA TB-144 Classification Compatibility 11 Grade Points Minimum (AAA, BBA)
The City shall approve the design mix and all Micro Surfacing materials and methods prior to use and shall designate the proportions to be used within the following limits:
Residual Asphalt 5.5% to 9.5% by dry weight of aggregate Mineral Filler 0% to 3% by dry weight of aggregate Polymer Based Modifier Shall be a minimum of 3% solids content
Water (Potable) As required to provide proper consistency 67-5 SpreadingEquipment
The mixture shall be agitated and spread uniformly in the surfacing box by means of twin-shafted paddles or spiral augers fixed in the spreader box. A front seal shall be provided to ensure no loss of the mixture at the road contact point. The rear seal shall act as a final strike-off and shall be adjustable. The spreader box and rear strike-off shall be so designed and operated that a uniform consistency is achieved and a free flow of material is provided to the rear strike-off. The spreader box shall have suitable means provided to side shift the box to compensate for variations in the pavement geometry.
Each mixing unit to be used in the performance of the work shall be calibrated in the presence of the B.A.R. prior to the start of the project. Previous calibration documentation covering the exact materials to be used may be acceptable, provided that no more than 60 days have lapsed. The documentation shall include an individual calibration of each material at various settings that can be related to the machine metering devices.
Any component replacement affecting material proportioning requires that the machine be recalibrated. No machine will be allowed to work on the project until the calibration has been completed and/or accepted. 610
RFB 25-26-33, FY 25-26 CAPE SEAL PROJECT
71 ISSA Inspector’s Manual describes a method of machine calibration. ISSA contractors and/or machine manufacturers may also provide methods of machine calibration. 67-6 Application
Micro surfacing shall be placed at a rate of 20-32 lb/SY for Type II (Dry pounds per yard).
Micro surfacing shall not be applied if either the pavement or air temperature is below 50°F (10°C) and falling but may be applied when both pavement and air temperatures are above 45°F (7°C) and rising. No Micro Surfacing shall be applied when there is the possibility of freezing temperatures at the project location within 24 hours after application. The Micro Surfacing shall not be applied when weather conditions prolong opening to traffic beyond a reasonable time.
If truck-mounted mixer-spreaders are used, keep at least 2 operational spreaders at the job site during placement. Approved hand squeegees, with burlap drags, shall be used to spread Micro Surfacing in areas not accessible to the Micro Surfacing spreader box. Care shall be exercised in leaving no unsightly appearance from handwork.
Care shall be taken to ensure straight lines along curbs and shoulders. No runoff on these areas will be permitted. Lines at intersections shall be kept straight to provide a good appearance. 67-7 Curing
Areas receiving Micro Surfacing will be allowed to cure from one to three hours or until the treated pavement will not be damaged by traffic. The Contractor will protect the area with suitable barricades or markers for the full curing period. Areas which are damaged within 24 hours of application of Micro Surfacing, or prior to moving to new work locations, shall be repaired by the Contractor at his expense. 67-8 Traffic
Suitable methods shall be used by the contractor to protect the Micro Surfacing from damage from all types of vehicular traffic. Opening to traffic does not constitute acceptance of the work. The Project Manager shall be notified of the methods to be used. In areas that are subject to an increased rate of sharp-turning vehicles, additional time may be required for a more complete cure of the Micro Surfacing mat to prevent damage. Slight tire marks may be evident in these areas after opening but will diminish over time with rolling traffic. If these areas are not severely rutted, they should be considered as normal characteristics of Micro Surfacing.
67-9 Clean Up
All areas, such as manways, gutters and intersections, shall have the Micro Surfacing removed as specified by the Project Manager. The Contractor shall remove any debris associated with the performance of the work on a daily basis. All plastic shall be removed from covers at the end of the project before traffic is opened to the public.
67-10 Payment
The Micro Surfacing shall be measured and paid for by the square yards on the work completed and accepted by the buyer. The price shall be full compensation for furnishing all materials; for preparation, 611
RFB 25-26-33, FY 25-26 CAPE SEAL PROJECT
72 mixing and applying these materials; and for all labor, equipment, tools, test design, cleanup and incidentals necessary to complete and warrant the job as specified herein.
SECTION 68 SIGNAGE, STRIPING AND PAVEMENT MARKINGS
68-1 Painted Traffic Stripes & Pavement Markings
Painted traffic stripes (traffic lines) and pavement markings shall be applied in conformance with the provisions in Section 46, "Traffic Stripes, signs, and Pavement Markings," of the City Standard Specifications and these special provisions. Traffic stripes and pavement markings shall be applied 2 weeks after the completion of the Cape Seal application.
Contractor shall submit a plan showing the locations of existing striping and pavement markings in sufficient detail to lay out the striping again after the resurfacing operations have been completed. This plan shall be submitted prior to Asphalt Rubber Chip Seal application.
After the Micro-Surfacing the contractor shall cat track the areas to be striped and request approval of the layout from city staff prior to re-striping the roadway.
Paint for traffic stripes and pavement markings shall conform to the following State Specifications:
Paint Type Color State Specification No.
Water-Based PTWB01 White, Yellow, and Black PT-100VOC
Thinning of paint will not be allowed.
Black paint shall be required in the center for Detail 22.
The Contractor shall provide the Engineer with a Certificate of Compliance in conformance with the provisions of Section 6-1.07, "Certificates of Compliance." The certificate shall certify that the paint complies with the specifications
Where striping joins existing striping, the Contractor shall begin and end the transition from the existing striping pattern into or from the new striping pattern a sufficient distance to ensure continuity of the striping pattern.
Traffic stripes and pavement markings shall be applied only on dry surfaces and only during periods of favorable weather. Painting shall not be performed when the atmospheric temperature is below 50° F when using water-based paint, when freshly painted surfaces may become damaged by rain, fog, or condensation; nor when it can be anticipated that the atmospheric temperature will drop below the aforementioned 50° F.
Surfaces which are to receive traffic stripes and pavement markings shall be cleaned of all dirt and loose material.
Each coat of paint for any traffic stripe shall be applied in one pass of the striping machine, regardless of the number, widths and patterns of individual stripes involved.
Paint shall be applied in 2 coats approximately as follows:
Water-based paints @ square foot coverage per gallon:
215sf/gal - 1st coat
612
RFB 25-26-33, FY 25-26 CAPE SEAL PROJECT
73 215sf/gal - 2nd coat
Traffic stripes and pavement markings shall be free of runs, drag marks, stretch marks, and debris. 68-2 Painted Traffic Stripes & Pavement Markings
The approximate quantities of pavement marking and scripting replacement required for the project is measured in lump sum and shall match what was covered due to this project work. Below is a sample of the type of markings to be replaced.
"BIKE LANE" markers
"STOP" markers
"STOP AHEAD” markers
White Stop Lines
White Crosswalk Lines
Yellow Crosswalk Lines
White Bike Lane Striping (7501 of bike lane)
"Dashed" Yellow Centerline
“White Undulation" Striping (8 undulations, five 1 foot-wide stripes each) "Dashed" White Striping
Solid White Striping
Solid Double Yellow Striping
It shall, however, be the responsibility of the Contractor to replace what was there before the work started, in accordance with these specifications all such markers and striping affected by the project regardless of variations from the above listing. No additional or lesser lump sum payment from that bid will be made. Full payment will be the lump sum bid.
SECTION 69 RAISED PAVEMENT MARKERS
69-1 General
Raised Pavement Markers shall be as specified in Section 47 “Raised Pavement Markers” of the Standard Specifications. As a part of this Contract the Contractor shall replace all raised pavement markers in the streets where the Cape Seal is applied on arterials and collector streets or as required. Contractor shall also install raised pavement markers in front of fire hydrants regardless of whether the marker was present or not prior to construction.
69-2 Measurement and Payment
Measurement and payment for installing Raised Pavement Markers will be made on a lump sum basis and shall include full compensation for furnishing all labor, materials, tools, equipment and incidentals and for 613
RFB 25-26-33, FY 25-26 CAPE SEAL PROJECT
74 doing all the work involved therein as shown on the Plans, as specified in the Specifications, the Special Provisions, the Contract Documents, or as directed by the Engineer. 614
RFB 25-26-33, FY 25-26 CAPE SEAL PROJECT
75 SECTION 80 DESCRIPTION OF BID ITEMS
The bid item descriptions in this section are meant to provide a brief summary of the work included under each item. The Contractor shall refer to the Plans, Standard Specifications, Special Provisions, and other Contract Documents for the complete details and requirements for the work being performed under this contract.
80-01 Mobilization & Demobilization
Payment for Mobilization & Demobilization shall be at the contract lump sum price and shall include full compensation for furnishing all labor, materials, tools, equipment, and incidentals, and for doing all the work in accordance with Section 11 “Mobilization & Demobilization,” of the Standard Specifications, the Special Provisions, the Contract Documents, and as directed by the Engineer including, but not limited to the following:
Mobilization shall consist of preparatory work and operations, including, but not limited to, those necessary for the movement of personnel, equipment, supplies, and incidentals to the project site; for the establishment of all offices, buildings, staging yards, and other facilities necessary for the work on the project; and for all other work and operations which must be performed or costs incurred prior to beginning work on the various contract items on the project site, including, but not limited to permits and bond premiums and insurance premiums.
Demobilization shall consist of all closing work and operations, including, but not limited to, those necessary for the movement of personnel, equipment, supplies, and incidentals off the project site, and all other work and operations which must be performed to complete the project, including clean-up.
No additional payment will be made therefor.
80-02 Traffic Control
Payment for Traffic Control shall be at the contract lump sum price and shall include full compensation for furnishing all labor, materials, tools, equipment and incidentals, and for doing all the work in accordance with Section 12 “Traffic Control; Construction Area Traffic Control Devices,” of the Standard Specifications, the Special Provisions, the Contract Documents, and as directed by the Engineer including, but not limited to, furnishing equipment, signs, devices, barriers, pavement markings, channelizers, flaggers as required, performing road closures and detours, temporary pavement installation and removal and disposal, temporary fences, securing approval of traffic control plans, traffic control plan design, notifications, providing convenient access to adjacent residences and businesses, and all devices required for the control of traffic as herein provided. No additional payment will be made therefor. 80-03 Portable Changeable Message Signs (PCMS)
Payment for Portable Changeable Message Signs (PCMS) shall be at the contract lump sum price and shall include full compensation for furnishing all labor, materials, tools, equipment and incidentals, and for doing all the work in accordance with Section 12 “Traffic Control; Construction Area Traffic Control Devices,” of the Standard Specifications, Section 64-4.2 of these Special Provisions, the Contract Documents, and as directed by the Engineer including, but not limited to, furnishing, transporting, installing, maintaining, and removing Portable Changeable Message Signs to the satisfaction of the City of Visalia. No additional payment will be made therefor.
80-04 Measure N Signage
Payment for Measure N Signage shall be at the contract lump sum price and shall include full compensation for furnishing all labor, materials, tools, equipment and incidentals, and for doing the respective work needed to install Measure N Signs in accordance with Section 12 “Traffic Control” of the Standard Specifications, Section 64-4.1 of these Special Provisions, the Contract Documents, and as directed by the Engineer 615
RFB 25-26-33, FY 25-26 CAPE SEAL PROJECT
76 including, but not limited to, furnishing equipment, furnishing signs, installation, removal and salvaging of signs and associated work. No additional payment will be made therefor. 80-05 Asphalt Rubber Chip Seal (3/8” Grading)
Payment for Asphalt Rubber Chip Seal (3/8” Grading) shall be at the contract price paid by the square yard as shown on the bid item schedule and shall include full compensation for furnishing all labor, materials, tools, equipment and incidentals, and for doing all the work in accordance with Section 27 “Bituminous Seals,” of the Standard Specifications, the Special Provisions, the Contract Documents, and as directed by the Engineer including, but not limited to, notification to the public, clearing the roadways, cleaning the roadway, preparing the roadway, spreading, placing, and curing the chip seal complete in place. If seals are being paid for by the square yard, the deductions listed in Caltrans Standard Specification Section 37 will still apply. No additional payment will be made therefor. 80-06 Micro-Surfacing (Type II)
Payment for Micro-Surfacing (Type II) shall be at the contract price paid by the square yard as shown on the bid item schedule and shall include full compensation for furnishing all labor, materials, tools, equipment and incidentals, and for doing all the work in accordance with Section 27 “Bituminous Seals,” of the Standard Specifications, the Special Provisions, the Contract Documents, and as directed by the Engineer including, but not limited to, noticing the public, clearing the roadways, cleaning the roadway, preparing the roadway, spreading, placing, and curing the Micro-Surfacing complete in place. If seals are being paid for by the square yard, the deductions listed in Caltrans Standard Specification Section 37 will still apply. No additional payment will be made therefor.
80-07 Striping and Pavement Markings
Payment for Striping and Pavement Markings shall be at the contract lump sum price and shall include full compensation for furnishing all labor, materials, tools, equipment and incidentals, and for doing all the signing, striping, and pavement marking work in accordance with Section 46 “Traffic Stripes, Signs, and Pavement Marking,” of the Standard Specifications, Section 68 of the Special Provisions, the Contract Documents, and as directed by the Engineer for providing all signing, striping and pavement marking, along the trail and roadways complete in place. No additional payment will be made therefor.
80-08 Raised Pavement Markers
Payment for Raised Pavement Markers shall be at the contract lump sum price and shall include full compensation for furnishing all labor, materials, tools, equipment and incidentals, and for doing all the work in accordance with Section 47 “Raised Pavement Markers,” of the Standard Specifications, Section 67 “Raised Pavement Markers” of the Special Provisions, the Contract Documents, and as directed by the Engineer for providing and installing Raised Pavement markers, complete in place. No additional payment will be made therefor.
616
RFB 25-26-33, FY 25-26 CAPE SEAL PROJECT
77 STATE FUNDING REQUIREMENTS
80-1 State Funding Requirements
80-1.1 Labor
Attention is directed to the provisions and penalties applicable to workmen permitted to labor more than eight (8) hours in a calendar day, to labor discrimination, and to employment of alien labor. This project is prevailing wage. See Section 7 “Legal Relations and Responsibility”, for all prevailing wage requirements.
No discrimination shall be made in the employment of persons within Public Works because of race, color, or religion of such persons and every Contractor for Public Works violating this section is subject to the penalties imposed for a violation of Chapter 1 pf Part VII, Division 2 of the California Labor Code, in accordance with the provisions of Section 1735 of Said Code. 617
RFB 25-26-33, FY 25-26 CAPE SEAL PROJECT
78 APPENDIX A
City of Visalia Labor Compliance Manual
618
RFB 25-26-33, FY 25-26 CAPE SEAL PROJECT
79 APPENDIX B
State Prevailing Wages
APPENDIX C
619
RFB 25-26-33, FY 25-26 CAPE SEAL PROJECT
80 Cape Seal Map
APPENDIX D
620
RFB 25-26-33, FY 25-26 CAPE SEAL PROJECT
81 Cape Seal List
621
622
623
Visalia City Council
Staff Report
Visalia City Council
707 W. Acequia
Visalia, CA 93291
File #: 25-0738 Agenda Date: 4/6/2026 Agenda #: 13.
Agenda Item Wording:
Authorize the purchase of three (3) Skydio unmanned aerial systems (UAS) - Request authorization to award a purchase contract with Axon Enterprise located in Scottsdale, Arizona for two (2) Skydio X10 UAS and one (1) R10 Indoor UAS in the amount of $53,600 under a Sourcewell cooperative procurement agreement under contract #101223 and appropriate $18,470 from the General Fund.
Agenda Date: 04/06/2026
Prepared by: Police Chief Jason Salazar, 713-4215, [email protected] ; Captain Daniel Ford, 713-4151, [email protected] ; Lieutenant Clay Moffett, 713- 4408, [email protected] ; Financial Analyst Liz Ybarra, 713-4250, [email protected] Department Recommendation: Request authorization to award a purchase contract with Axon Enterprise, Inc. located in Scottsdale, Arizona for two (2) Skydio X10 UAS and one (1) R10 Indoor UAS from Axon Enterprise in the amount of $53,600 under Sourcewell Contract #101223 and appropriate $18,470 from the General Fund.
Summary:
The Visalia Police Department has utilized unmanned aerial systems (UAS) for approximately eight years, primarily operating consumer-grade DJI Mavic drones assigned to individual pilots. In addition, the Department maintains two larger DJI Matrice drones equipped with FLIR cameras for nighttime and preplanned operations and DJI Avata drones for indoor operations. While these systems have supported UAS operations, pilots have identified several operational limitations.
The smaller DJI Mavic drones have limited flight times, particularly during summer months when extreme heat degrades battery performance and has resulted in in-flight failures. Additionally, these drones lack integrated thermal imaging capabilities, restricting their effectiveness during nighttime operations. Their consumer-grade construction has also raised durability concerns. Further, DJI drones are manufactured outside the United States and are subject to frequent design changes, requiring replacement of proprietary parts and batteries when models are updated.
The Department currently deploys one DJI Matrice 30T drone at each district substation, allowing pilots access to FLIR-equipped platform when needed. These drones provide superior imaging, thermal capability, and extended flight time, making them the most effective assets in the current fleet. Purchasing two additional drones with comparable capabilities will allow for more rapid deployment and improve situational awareness for on-scene first responders.
Staff had originally planned on replacing the current drones with like models. However, the intended replacements were no longer available, and the United States FCC has since banned the use of foreign-made drones for replacement or new UAS platforms for use in law enforcement. Replacing the smaller DUI drones with law-enforcement-specific Skydio X10 drones, manufactured in the Visalia City Council Page 1 of 3 Printed on 4/2/2026
powered by Legistar™624
File #: 25-0738 Agenda Date: 4/6/2026 Agenda #: 13.
the smaller DUI drones with law-enforcement-specific Skydio X10 drones, manufactured in the United States, will provide capabilities consistent with the Matrice 30T while allowing more rapid deployment and remaining compliant with new federal guidelines. Additionally, the Skydio X10 drone platform is the superior law enforcement drone. The chassis design allows for hardware and software upgrades while maintaining its original chassis. This allows for drone technology to evolve as technology and advancements advance without the cost of purchasing a new drone. Additionally, their advanced imaging and flight performance will enhance situational awareness and improve officer and public safety.
This shift in drone technology has changed the operational deployment strategy for the department.
Instead of permanently assigning drones to each individual drone operator, these drones will now be issued to trained officers at the start of each shift and deployed as incidents require. The proposed deployment model will support a range of operations and units. Drones are used to assist in tracking subjects fleeing from officers, assisting members of the HOPE team in identifying encampments in areas not easily visible, and help to provide enhanced situational awareness during high-risk arrest details handled by the department’s Special Enforcement Unit and SWAT Team. Drones have also proven to be resources for other City divisions such as Fire (HAZMAT and large fire responses) and were heavily used during the flooding events of 2023.
Additionally, the Department currently utilizes DJI Avata indoor drones for interior reconnaissance; however, these systems have experienced connectivity and durability issues. The Skydio R10 indoor drone is purpose-built for law enforcement and offers enhanced obstacle avoidance and indoor flight capability, allowing officers to conduct interior visual assessments prior to entry. This capability supports de-escalation, intelligence gathering, and improved safety outcomes for officers, suspects, and the public.
Background Discussion:
The Visalia Police UAS Unit currently consists of ten (10) pilots and ten (10) DJI drones. Of the ten drones in the fleet, seven (7) are older Mavics, of which three are inoperable, one (1) is an indoor Avata, and the remaining two (2) are Matrices.
Through discussions within the UAS Unit and the wider law enforcement industry, establishing a responsible replacement schedule is difficult. Rapid advances in drone technology make it hard to predict how long companies will support current software and hardware. For example, the 2017 DJI Mavic 2 still receives software updates and replacement batteries, though batteries are now only made by non-DJI companies. Additional factors determine how long a drone remains operational.
Frequency of use, duration (battery life), type of operation (such as flying in heavy winds), and specific needs (like FLIR, spotlight, or PA system) all affect drone longevity.
The purchase of law-enforcement-specific Skydio drones provides a significant improvement in the ability to maintain hardware and upgrade technology as it is developed. The Skydio X10 drone uses the same chassis design and appearance, with only the hardware and software improved These software and hardware updates are offered at a discounted rate to Skydio customer. Skydio is an American manufacturer based in San Mateo, California. Additionally, Skiydio has partnered with AXON and is developing drone technology that will interact with current AXON products used by the department, such as BWC, Taser, and signal-sidearm activation. This integration will activate the drone’s camera systems to record and capture use of force events from the drone’s overhead position.
Visalia City Council Page 2 of 3 Printed on 4/2/2026
powered by Legistar™625
File #: 25-0738 Agenda Date: 4/6/2026 Agenda #: 13.
Fiscal Impact including annual maintenance and operating costs: Axon’s national contract with Sourcewell provides government agencies with cooperative procurement solutions and is valid until December 15, 2027. Both products on the quote are listed on the contract price listing with matching product codes. The current available budget is $35,132. Staff is requesting a transfer of funds from CIP budget 001/EQ0219 in the amount of $10,800 and CIP budget 012/EQ0208 in the amount of $24,332 to create a single multi-funded CIP account. To complete the funding, an additional appropriation of $18,470 is necessary from the General Fund for a total purchase price of $53,600.
There are no additional operating costs with this purchase.
Prior Council Action: N/A
Alternatives: Do not replace current drones that are becoming inoperable.
Recommended Motion (and Alternative Motions if expected):
Request authorization to award a purchase contract with Axon Enterprise, Inc. located in Scottsdale, Arizona for two (2) Skydio X10 UAS and one (1) R10 Indoor UAS from Axon Enterprise in the amount of $53,600 under a Sourcewell cooperative procurement agreement under contract #101223 and appropriate $18,470 from the General Fund.
Environmental Assessment Status: N/A
CEQA Review: N.A
Deadline for Action: 04/06/2026
Attachments: Axon Quote, Sourcewell contract with price listing Strategic Goal: Indicates which City Strategic Goal(s) this item supports. Check all that apply. ☐
Economic
Vitality
☒
Organizational
Excellence
☐
Fiscal
Strength
☒
Infrastructure &
Growth
☒
Quality of
Life
Visalia City Council Page 3 of 3 Printed on 4/2/2026
powered by Legistar™626
627
628
629
630
631
632
633
634
635
636
637
638
639
640
641
642
643
644
645
646
647
648
649
650
651
652
653
654
655
656
657
658
659
660
661
662
Visalia City Council
Staff Report
Visalia City Council
707 W. Acequia
Visalia, CA 93291
File #: 25-0739 Agenda Date: 4/6/2026 Agenda #: 14.
Agenda Item Wording:
Purchase of Altec bucket truck and appropriation of funds- Authorize the City Manager to award the purchase of an Altec bucket truck from Altec Industries in the amount of $249,353.13 and appropriate funds from the Vehicle Replacement Fund.
Agenda Date: 04/06/2026
Prepared by:
Danny Galindo, Public Works Manager, [email protected] , 713-4186 Nick Bartsch, Public Works Director, [email protected] ,713-4052 Department Recommendation: Staff recommends that City Council authorize the City Manager to award the purchase of an Altec bucket truck from Altec Industries, Inc. in the amount of $249,353.13 and appropriate funds from the Vehicle Replacement Fund (502).
Summary:
Staff obtained a quote for the purchase of a 2025 Dodge Ram 5500 Articulating Telescopic Aerial Device (Non-Insulated AT48S) under Sourcewell contract #110421-ALT from Altec Industries to replace a 2009 Ford F550 Bucket Truck in the amount of $249,353.13.
Background Discussion:
The current 2009 Ford F-550 bucket truck with 104,495 miles, has encountered significant mechanical issues, and after an assessment, Staff received an initial repair quote of $24,000.
However, after previously making identical repairs on a similar vehicle, it was determined that specific method of repair was not reliable. Therefore, a more substantial repair, including an engine replacement valued in excess of $50,000, would be required. Given its age, continued investment in the current vehicle is not recommended. The truck’s overall lifetime costs have already reached $133,736.55, which highlights the ongoing expense of keeping it operational.
This truck is an essential part of the Traffic Maintenance Division’s operations, used for the installation and maintenance of traffic signals and streetlights. Given its critical role and the high cost of repairs, Staff recommends the replacement of the vehicle to ensure continued efficiency in operations and to avoid further escalating maintenance costs.
Altec Industries, Inc. has provided a Sourcewell quote for the equipment that meets the needs and applications of the Traffic Safety Division. The specific truck in question is available now, but the process to custom order and build a new truck is currently approximately 2 years.
Sourcewell Cooperative Purchasing helps the City save time and money by purchasing from ready-to -use, competitively solicited contracts. Cooperative Purchasing is “Procurement conducted by, or on behalf of, one or more Public Procurement Units,” as defined by the American Bar Association Model Visalia City Council Page 1 of 2 Printed on 4/2/2026
powered by Legistar™663
File #: 25-0739 Agenda Date: 4/6/2026 Agenda #: 14.
Procurement Code for State and Local Governments. Sourcewell streamlines the purchasing process by developing Requests for Purchase for national competitive solicitations that meet or exceed local requirements. Because Altec Industries, Inc. are already competitively bid by Sourcewell, the City is able to utilize that contract to obtain the Sourcewell price.
Fiscal Impact including annual maintenance and operating costs:
The purchase for the new Altec Lift will be in the amount of $249,353.13 and will require appropriation of funds from the Vehicle Replacement Fund (502).
Prior Council Action: None
Alternatives: None recommended
Recommended Motion (and Alternative Motions if expected):
I motion to authorize the City Manager to award the purchase of an Altec bucket truck from Altec Industries, Inc. in the amount of $249,353.13 and appropriate funds from the Vehicle Replacement Fund.
Environmental Assessment Status: N/A
CEQA Review: N/A
Deadline for Action: 04/06/2026
Attachments:
Altec Quote
Specs
Vehicle Purchase Authorization Form
Cost Analysis
Vehicle Evaluation
Sourcewell Contract
Sourcewell Contract Extension
Sorcewell pricing
Strategic Goal:
☐
Economic
Vitality
☐
Organizational
Excellence
☐
Fiscal
Strength
☒
Infrastructure &
Growth
☐
Quality of
Life
Visalia City Council Page 2 of 2 Printed on 4/2/2026
powered by Legistar™664
Quote Number: 1991330 - 1
Altec, Inc.
We Wish To Thank You For Giving Us The Pleasure
And Opportunity of Serving You
UTILITY EQUIPMENT AND BODIES SINCE 1929
March 18, 2026
Our 97th Year
Ship To: Bill To:
CITY OF VISALIA
336 NORTH BEN MADDOX WAY
VISALIA, CA 93292
US
Attn: TONY PIRES
Phone: 559-8520605
Email: [email protected]
CITY OF VISALIA
336 N BEN MADDOX
VISALIA, CA 93292
United States
Altec Quotation Number: 1991330 - 1
Account Manager: Rhawnie Kraak
Technical Sales Rep: Cameron D Jones
Item Description Qty Price
Unit
1. Altec Model AT48S Articulating Telescopic Aerial Device, non-insulating with proportional joystick upper controls. Built in accordance to ALTEC's standard specifications and to include the following features:
1 A. Ground to Bottom of Platform Height: 47.0 feet at 7.3 feet from centerline of rotation (14.31 m at 2.22 m)
B. Working Height: 52.0 feet (15.84 m)
C. Maximum reach to edge of platform with Upper Boom Non- overcenter: 31.7 feet (at 21.6 feet platform height)
D. Upper boom extension: 110 inches
E. Continuous rotation
F. Articulating Arm: Articulation is from -3 to 82 degrees. Insulator provides 19 inches of isolation.
G. Compensation System: By raising the articulating arm only, the telescopic boom maintains its relative angle in relation to the ground. The work position is achieved through a single function operation.
H. Upper Boom: Articulation is from -25 to 85 degrees. The fiberglass section provides a minimum of 33.1 inches of isolation in the upper boom (when retracted and 64.6 inches when extended).
I. Platform leveling is achieved by a hydraulic master-slave leveling system. This lifetime system is very low maintenance.
J. Control System:
1) Control Handle: A single handle controller. The control handle is black in color.
The handle also includes an interlock guard that reduces the potential for inadvertent boom operation.
2) Auxiliary Control Covers: Non-tested blue silicon covers for auxiliary controls. 3) Control Console: Non-tested non-metallic control console plate. 4) Boom Tip Covers: Non-tested non-metallic boom tip covers. The covers are not dielectrically tested, but they may provide some protection against electrical hazards.
665
Quote Number: 1991330 - 1
Altec, Inc.
We Wish To Thank You For Giving Us The Pleasure
And Opportunity of Serving You
UTILITY EQUIPMENT AND BODIES SINCE 1929
Item Description Qty Price
K. Hydraulic system: Open center (full pressure), maximum flow 6 GPM, maximum operating pressure 3,000.
M. Unit is painted with a powder coat paint process which provides a finish-painted surface that is highly resistant to chipping, scratching, abrasion and corrosion.
Paint is electrostatically applied to the inside as well as outside of fabricated parts then high temperature cured prior to assembly ensuring maximum coverage and protection.
N. Manuals: Two (2) Operator's and Maintenance/Parts Manuals. One(1) in printed format and one(1) in electronic format available at connect.altec.com containing instructional markings indicating hazards inherent in the operation of an aerial device.
O. Unit meets or exceeds ANSI 92.2 standards.
2. Pedestal 1
3. Single 2-Man Platform, Aluminum (Non-Insulated), 60" x 36" x 45", End Mount, 180 Degree Rotation.
1 4. Platform Mounted Single Handle Controls 1
5. Material Handling Jib/Winch, Hydraulically Articulating, Top Mounted, Round (ARM Jib) 1
6. Rubber Floor Liner With Drainage For 60 x 36 x 45 inch (1524 x 914 x 1143 mm) aluminum platform
1 7. Hydraulic Tool Circuit at Platform: Control easily accessible to the operator activates the tool circuit. One set of hydraulic tool outlets at the boom tip; they consist of one set of quick disconnect couplings at the platform, a valve assembly inside the control cover, and detented control handle. Operates open center tools
1 8. Engine Start/Stop & Secondary Stowage System: 12 VDC powered motor and pump assembly for temporary operation of the unit in a situation wherein the primary hydraulic source fails. Electric motor is powered by the chassis battery. This feature allows the operator to completely stow the booms, platform, and outriggers. Secondary Stowage & Start/Stop is activated with an air plunger at the platform or momentary switch at the lower control station and outriggers.
1 9. 120 Volt Receptacle Installed At Platform 1
10. Jib Stick, 52" L, Extension Dependent, Non-Certified, grey in color 1
11. Platform Mounted Extendible Supports for Holding Signs 1
12. Slip Ring: Required for engine start/stop, secondary stowage system, and throttle control options
1 13. Outriggers, Primary, Modified A-Frame, 30''-34'' Chassis Height, Electric Interlock, No Valves On Legs, 112'' Spread, Fixed Shoe (AT48M/ME/P/PE/S/SE) 1 666
Quote Number: 1991330 - 1
Altec, Inc.
We Wish To Thank You For Giving Us The Pleasure
And Opportunity of Serving You
UTILITY EQUIPMENT AND BODIES SINCE 1929
Item Description Qty Price
14. Auxiliary Vertical H Frame Outriggers with fixed shoe. For installation on a 30 to 34 inch chassis frame height.
1 A. Maximum Spread: 87 inches
B. Outrigger Motion Alarms
C. Outrigger Interlocks: will not allow the unit to be operated until the outriggers have been at least partially deployed
15. Lifting Eye - lifting eye on underside of lower boom. Rated at 1,000lbs (454kg) lifting capacity.
1 16. Winch load line swivel hook 1
17. Altec Unit Powder Painted White 1
Unit & Hydraulic Acc.
18. Subbase 1
19. Electric Outrigger Controls for two (2) sets of outriggers, drive hydraulic outrigger control valves. Durable weather proof sealed electronic switches mounted in aluminum boxes located at the rear of the unit unless otherwise specified. 1 20. Steel Reservoir, 15 gallon capacity, rectangular, 26" L x 8.5" W x 20" H, and includes breather caps and dipsticks
1 21. Temperature Sight Gauge 1
22. Hydraulic Oil HVI-22 with Dye (Standard) 25
23. Standard Pump For PTO 1
24. Electric Shifted PTO 1
25. Standard PTO/Transmission Functionality for Small Ford and Dodge Chassis 1 Body
26. 122 inch Platform Line Body (half flat deck) suitable for installing on any 4x2 chassis with an approximate CA dimension of 84 inches, built in accordance with the following specifications:
1 A. Basic body fabricated from A40 grade 100% zinc alloy steel. 667
Quote Number: 1991330 - 1
Altec, Inc.
We Wish To Thank You For Giving Us The Pleasure
And Opportunity of Serving You
UTILITY EQUIPMENT AND BODIES SINCE 1929
Item Description Qty Price
B. All doors are full, double paneled, self-sealed with built-in drainage for maximum weather-tightness. Stainless steel hinge rods extend full length of door.
C. All doors are to contain stainless steel flush type, single point, two-stage rotary paddle latches with recessed handles, including keyed locks and strikers. Door latches are bolted to the outer door panel.
D. Heavy-gauge welded steel frame construction with structural channel crossmembers and treadplate floor.
E. All edges are either rolled or folded for strength and safety.
F. Integrated door header drip rail at top for maximum weather protection.
G. Fender panels are either roll formed or have neoprene fenderettes mechanically fastened.
H. Steel treated for improved primer bond and rust resistance.
I. Automotive underseal applied to entire underside of body.
J. Primer applied to complete interior and exterior of body.
K. Automotive type non-porous door seals mechanically fastened to the door facing.
L. 122 inch overall body length.
M. 96 inch overall body width.
N. 46 inch sidepack on streetside.
O. 20 inch body compartment depth.
P. Body finish paint color - Altec White.
Q. Finish paint body at body manufacturer.
R. 3 inch high retainer with corner washouts around the flatbed portion of body.
S. Gas shock type rigid door holders for vertical doors.
T. Chains on all horizontal doors.
U. Standard master body locking system.
V. One chock holder in fender panel on streetside of body.
W. Hotstick shelf extending the full length of body on streetside.
X. Two (2) hotstick brackets installed on streetside.
Y. Drop-down hotstick door installed on streetside.
Z. 1st vertical streetside (LH) - Two (2) adjustable shelves with removable dividers on 4 inch centers.
AA. 2nd vertical streetside (LH) - Two (2) adjustable shelves with removable dividers on 4 inch centers.
AB. 1st horizontal streetside (LH) - One (1) fixed shelf with removable dividers on 4 inch centers installed on bottom of compartment.
AC. Rear vertical streetside (LH) - Two (2) adjustable shelves with removable dividers on 4 inch centers.
AD. Flatbed (RH) - Flatbed in lieu of horizontal or vertical compartments.
AE. One (1) 360 degree recessed d-ring installed in the curbside of body floor toward cab of truck.
AF. One (1) 360 degree recessed d-ring installed in the curbside of body floor toward tailboard.
AG. 48 inch tailshelf with integrated side access steps with wooden retaining board at top. Includes one (1) U-shaped grab handle, one (1) post-style grab handle, and a 3 inch high fixed steel retaining rail with corner wash-out.
AH. One (1) steel electrical enclosure box, with one (1) drop-down door, chain door holders, and keyed latch. To be 40'' L x 22'' H x 20'' D and vented. Installed front curbside beneath flatbed.
AI. E-track installed on streetside interior cargo wall, as far forward as possible, 10'' 668
Quote Number: 1991330 - 1
Altec, Inc.
We Wish To Thank You For Giving Us The Pleasure
And Opportunity of Serving You
UTILITY EQUIPMENT AND BODIES SINCE 1929
Item Description Qty Price
below compartment top.
Body and Chassis Accessories
27. Underride Protection Bumper Installed At Rear 1
28. Receiver Hitch, 2'', Class 3 1
29. Set Of Eye Bolts for Trailer Safety Chain, installed one each side of towing device mount. 1
30. SuperSpring Installed at Streetside Rear Leaf Spring to Level Chassis 1
31. Rigid Step Mounted Beneath Side Access Steps (Installed To Extend Approx. 2'' Outward) 1
32. Platform Rest, Rigid with Rubber Tube 1
33. Articulating Arm Rest for a Telescopic Unit 1
34. Boom Rest for a Telescopic Unit 1
35. Wood Outrigger Pad, 19'' x 19'' x 2.5'', With Rope Handle 4
36. Outrigger Pad Holder, 20" L x 20" W x 7" H, Fits 19.5" x 19.5" And Smaller Pads, Bolt-On, Bottom Washout Holes, 3/4" Lip Retainer
2 37. Pendulum Retainers For Outrigger Pad Holders 2
38. Install outrigger pad holders under body on curbside behind rear axle. 1
39. Mud Flaps With Altec Logo (Pair) 1
40. Wheel Chocks, Rubber, 9.75'' L x 7.75'' W x 5.00'' H, with 4'' L Metal Hairpin Style Handle (Pair)
1 41. Wheel Chock Holder, Installed Under Body on Curbside Behind Outrigger Pad Holder 1
42. Slope Indicator Assembly (Pair) For Machine With Outriggers 1
43. Safety Harness & 4.5 FT Lanyard (Medium To X-large) 2
44. Driveaway Safety Kit 1
45. Vinyl manual pouch for storage of all operator and parts manuals 1 669
Quote Number: 1991330 - 1
Altec, Inc.
We Wish To Thank You For Giving Us The Pleasure
And Opportunity of Serving You
UTILITY EQUIPMENT AND BODIES SINCE 1929
Item Description Qty Price
Electrical Accessories
46. Lights and reflectors in accordance with FMVSS #108 lighting package. (Complete LED, including LED reverse lights)
1 47. 4-Corner Strobes, Amber, LED, Two (2) Surface Mounted Lights In Grille, Two (2) Round Lights At Rear
1 48. Strobe Beacons, Amber LED, with Brush Guard, Installed on Post at Front of Body, One (1) Each Side (Standard) (Tecniq #K10-AAAD-1)
1 49. Dual Tone Back-Up With Outrigger Motion Alarm 1
50. PTO Hour Meter, Digital, with 10,000 Hour Display 1
51. 7-Way Trailer Receptacle (Blade Type) Installed At Rear 1
52. Dodge Upfitter Switches (Supplied with Chassis) 1
53. Inverter with Minimum 2000W 120V @ 16A Pure Sine Wave Output, Hardwired to Outlets and 12VDC Input. Features Include Surge Ratings at 300 Percent for 1 ms, 200 Percent for 100 ms and 2/0 AWG 12V Wiring.
1 54. Inverter Wired Battery Hot To Switch Mounted In Chassis Cab 1
55. Install inverter inside underbody storage box on curbside. 1
56. 120 Volt GFCI Receptacle, includes weather-Resistant enclosure. Installed in curbside underbody box
1 57. GFCI Receptacle Hardwired To Protect Additional Non-GFCI Duplex Receptacles. 1
58. Install Wiring for Additional Non-GFCI Receptacle Located at Platform (15 Amps Maximum)
1 59. Power Distribution Module (PDM-6A), 6 Accessory Circuits, CAN Signals, Installed, Chevy/International CV, Ford, Dodge
1 60. Dodge Module 1
61. Install Chassis (OEM) Supplied Backup Camera in Final Assembly 1
62. Install secondary stowage system. 1
670
Quote Number: 1991330 - 1
Altec, Inc.
We Wish To Thank You For Giving Us The Pleasure
And Opportunity of Serving You
UTILITY EQUIPMENT AND BODIES SINCE 1929
Item Description Qty Price
63. Install Remote Start/Stop system in Final Assembly. 1
64. Install Outrigger Interlock System 1
65. Heavy Duty Secondary Stowage Pump 1
66. One Emergency Stop Located at Ground Level Installed at the Rear of the Vehicle 1
67. PTO Indicator Light Installed In Cab 1
Finishing Details
68. Powder Coat Unit Altec White 1
69. Finish Paint Body Accessories Above Body Floor Altec White 1
70. Altec Standard; Components mounted below frame rail shall be coated black by Altec. i.e. step bumpers, steps, frame extension, pintle hook mount, dock bumper mounts, D-rings, receiver tubes, accessory mounts, light brackets, under-ride protection, etc. Components mounted to under side of body shall be coated black by Altec. i.e. Wheel chock holders, mud flap brackets, pad carriers, boxes, lighting brackets, steps, and ladders. 1 71. Apply Non-Skid Coating to all walking surfaces 1
72. English Safety And Instructional Decals 1
73. Vehicle Height Placard - Installed In Cab 1
74. Placard, HVI-22 Hydraulic Oil 1
75. Stability test unit according to ANSI requirements. 1
76. Focus Factory Build 1
77. Delivery Of Completed Unit 1
78. As Built Electrical And Hydraulic Schematics To Be Included In The Manual Pouch 1 Chassis
79. Altec Supplied Chassis 1
671
Quote Number: 1991330 - 1
Altec, Inc.
We Wish To Thank You For Giving Us The Pleasure
And Opportunity of Serving You
UTILITY EQUIPMENT AND BODIES SINCE 1929
Item Description Qty Price
80. Altec Stock Chassis 1
A. 2025 Model Year
B. Dodge Ram 5500
C. Regular Cab
D. 4x2 Drivetrain
E. Chassis Color - White
F. Cummins 6.7L Turbo Diesel (Dodge)
G. 325 HP Engine Rating
H. ZF Powerline 8AP850 Automatic Transmission (Dodge Chassis) I. Clear Cab to Axle Length - 84 inches
J. Wheelbase Length - 168.5 inches
K. 19,500 LBS Gross Vehicle Weight Rating (GVWR)
L. 7,250 LBS Front Axle Weight Rating (FAWR)
M. 13,500 LBS Rear Axle Weight Rating (RAWR)
N. Dodge 3500-5500 Single Horizontal Right Side Exhaust O. Hydraulic Brakes
P. Park Brake In Rear Wheels
Q. NFH - RAM 52 Gallon Fuel Tank (Rear)
R. RAM 9 Gallon DEF Tank (Under Cab Left Hand)
S. 225/70R19.5 Front Tire
T. 225/70R19.5 Rear Tire
U. LBN - Dodge PTO Prep Package (Right Hand Side PTO)
V. AZB - Heavy Duty Front Suspension Group
W. Cold Weather Group (Includes Block Heater)
X. Ambulance Prep Package
Y. No Idle Engine Shut-Down Required
Z. 50-State Emissions
AA. Clean Idle Certification
AB. Air Conditioning
AC. AM/FM Radio
AD. Backup Camera, OEM Supplied
AE. Bluetooth
AF. Cruise Control
AG. Dodge Uconnect
AH. Keyless Entry
AI. Limited Slip Rear Axle
AJ. Power Door Locks
AK. Power Mirrors with Heated Glass
AL. Power Windows
AM. Tilt Steering Wheel
AN. Trailer Brake Controller (Factory Installed)
AO. Vinyl Split Bench Seat
AP. Collision Mitigation
672
Quote Number: 1991330 - 1
Altec, Inc.
We Wish To Thank You For Giving Us The Pleasure
And Opportunity of Serving You
UTILITY EQUIPMENT AND BODIES SINCE 1929
Item Description Qty Price
Additional Pricing
81. Standard Altec Warranty: One (1) year parts warranty, one (1) year labor warranty, ninety (90) days warranty for travel charges, limited lifetime structural warranty 1 82. Administration Fees 1
83. Documentation Fees 1
84. State Tire Tax 1
Miscellaneous
85. Carb Registered State (California) 1
Altec Industries, Inc.
BY
Cameron D Jones
*Pricing in this quote does not include potential cost impacts related to the EPA emission regulations scheduled to take effect in calendar year 2027 for all medium and heavy duty engines. Chassis OEM's anticipate these regulatory changes may result in additional increases estimated between $15,000 and $25,000.
673
Quote Number: 1991330 - 1
Altec, Inc.
We Wish To Thank You For Giving Us The Pleasure
And Opportunity of Serving You
UTILITY EQUIPMENT AND BODIES SINCE 1929
Notes:
1 Altec will make every effort to honor this quotation, subject to the following provisions. Prices for equipment with production start dates 12 months and beyond are budgetary only due to irregular cost inflation and market volatility. These prices will be reviewed based on market conditions and confirmed closer to the production date.
For a quoted chassis model year beyond the current open order bank, chassis model year, specifications and price should be considered estimates only and subject to change. Chassis model year, specifications and price will be reviewed and confirmed when specific model year information becomes available from the OEM. 2 Estimated Delivery: 4-6 months after receipt of order PROVIDING:
A. Customer supplied chassis (if applicable) is received a minimum of sixty (60) days before scheduled delivery.
B. Customer approval drawings are returned by requested date.
C. Customer supplied accessories are received by date necessary for compliance with scheduled delivery.
D. Customer expectations are accurately captured prior to major components being ordered (body, chassis) and line set date. Unexpected additions or changes made after this time or at a customer inspection will delay the delivery of the vehicle.
Estimated Delivery is based on information at time of quote and is subject to change.
Altec reserves the right to change suppliers in order to meet customer delivery requirements, unless specifically identified, by the customer, during the quote and or ordering process. 3 This quotation is valid until APR 27,2026. After this date, please contact Altec Industries, Inc. for a possible extension.
4 F.O.B. - #FOB_TERMS#
5 Interest charge of 1/2% per month to be added for late payment. 6 FINANCING AVAILABLE: Please contact Altec Capital at (888) 408-8148 or email [email protected] for more information.
7 Price does not reflect any local, state or Federal Excise Taxes (F.E.T). The quote also does not reflect any local title or licensing fees. All appropriate taxes will be added to the final price in accordance with regulations in effect at time of invoicing.
8 Changes made to this order may affect whether or not this vehicle is subject to F.E.T. A review will be made at the time of invoicing and any applicable F.E.T. will be added to the invoice amount. 9 Any payment made by a credit card may be subject to a surcharge fee. 10 Altec Standard Warranty:
One (1) year parts warranty.
One (1) year labor warranty.
Ninety (90) days warranty for travel charges.
Warranty on structural integrity of the following major components is to be warranted for so long as the initial purchaser owns the product: Booms, boom articulation links, hydraulic cylinder structures, outrigger 674
Quote Number: 1991330 - 1
Altec, Inc.
We Wish To Thank You For Giving Us The Pleasure
And Opportunity of Serving You
UTILITY EQUIPMENT AND BODIES SINCE 1929
weldments, pedestals, subbases and turntables.
Altec is to supply a self-directed, computer based training (CBT) program. This program will provide basic instruction in the safe operation of this aerial device. This program will also include and explain ANSI and OSHA requirements related to the proper use and operation of this unit.
Altec offers its standard limited warranty with the Altec supplied components which make up the Altec Unit and its installation, but expressly disclaims any and all warranties, liabilities, and responsibilities, including any implied warranties of fitness for a particular purpose and merchantability, for any customer supplied parts Altec designs and manufactures to applicable Federal Motor Vehicle Safety and DOT standards 11 Altec Extended Warranty Option:
An Altec Extended Warranty is an extension of Altec's Limited Warranty and protects you from the repair cost associated with defects of materials and workmanship after the standard Limited Warranty expires.
Altec offers many types of coverages and coverage packages. Ask your Altec account manager for details.
Quotes are available upon request.
12 After the initial warranty period, Altec Industries, Inc. offers mobile service units, in-shop service and same day parts shipments on most parts from service locations nationwide at an additional competitive labor and parts rate. Call 877-GO-ALTEC for all of your Parts and Service needs. 13 Trade-in offer is conditional upon equipment being maintained to DOT (Department of Transportation) operating and safety standards and remaining in compliance of DOT until arrival at an Altec Facility. This will include, but is not limited to engine, tires, lights, brakes, glass, etc. All equipment, i.e., jibs, winches, pintle hooks, trailer connectors, etc., are to remain with unit unless otherwise agreed upon in writing by both parties.
ALTEC Industries reserves the right to re-negotiate its trade-in offer if these conditions are not met.
All reasonable and necessary expenses required of ALTEC Industries to execute transportation of the trade-in will be invoiced to the customer for payment if these conditions are not met to maintain DOT standards.
Customer may exercise the option to rescind this agreement in writing within sixty (60) days after receipt of purchase order. After that time ALTEC Industries will expect receipt of trade-in vehicle upon delivery of new equipment as part of the terms of the purchase order unless other arrangements have been made. 14 The final fully loaded weight of the truck and structural ratings of the hitch assembly may reduce the towing capacity and the vertical load capacity of the finished truck. These capacities may not match the ratings of the chassis or hitch.
15 Altec takes pride in offering solutions that provide a safer work environment for our customers. In an effort to focus on safety, we would encourage you to consider the following items:
Outrigger pads (When Applicable)
Fall Protection System
Fire extinguisher/DOT kit
Platform Liner (When Applicable)
Altec Sentry Training
Wheel Chocks
The aforementioned equipment can be offered in our new equipment quotations. If you find that any of these 675
Quote Number: 1991330 - 1
Altec, Inc.
We Wish To Thank You For Giving Us The Pleasure
And Opportunity of Serving You
UTILITY EQUIPMENT AND BODIES SINCE 1929
items have not been listed as priced options with an item number in the body of your quotation and are required by your company, we would encourage you to contact your Altec Account Manager and have an updated quote version sent to you. These options must be listed with an item number in the quotation for them to be supplied by Altec.
16 Altec values your data privacy. The Altec Family of Companies (including Altec, Inc., and it's subsidiaries) may collect telematics data from the equipment you own. Please review Altec's Equipment Data Privacy Notice on www.altec.com for more information. By purchasing equipment from Altec, you consent to Altec's right to collect and use such data.
17 RECOMMENDED OPTIONS AND ACCESSORIES: These options are not included in the quote total price.
Selected options will change the quote total. Any options added after initial order will be re-quoted.
676
Quote Number: 1991330
Opportunity Number: 26193102
Sourcewell Contract #: 110421-ALT
Date: 3/16/2026
REFERENCE ALTEC MODEL
Sourcewell
Price
Commercial
List Price
Discou
nt %
Articulating Telescopic Aerial Device (Non-Insulated AT41S) $227,323 $234,353 3% (A.)
1 AT41S-US48 Articulating Telescopic Aerial Device (Non-Insulated AT48S) $13,456 $13,872 3% 2 3
4 (A1.)
1 LIC CA Fee To Process Exempt License Plate Request $139 $139 0% 2 3
4 5
6 7
8 9
10 SOURCEWELL OPTIONS TOTAL: $240,918 $248,365 3%
(B.)
1 UNIT $0
2 UNIT & HYDRAULIC ACC $0
3 BODY Stock Body ILO Contract -$284
4 BODY & CHASSIS ACC $0
5 ELECTRICAL $0
6 FINISHING $0
7 CHASSIS MY 2025 RAM 5500 -$12,042
8 OTHER Altec MY Price Adjustment -$8,864
OPEN MARKET OPTIONS TOTAL: -$21,190
$10,775.00
$10.50
(C.)
1 2
3 4
WARRANTY: Standard Altec Warranty for Aerials and Derricks - One (1) year parts warranty One (1) year labor warranty Ninety (90) days TRADE-IN: Please ask your Altec Account Manager for more information CHASSIS: Per Altec Commercial Standard
DELIVERY: TBD Based on availability, FOB Customer Location TERMS: Net 30 days
BEST VALUE: Altec boasts the following "Best Value" features: Altec ISO Grip Controls for Extra Protection, Only Lifetime Warranty on Structural Components in Industry, Largest Service Network in Industry (Domestic and Overseas), Altec SENTRY Web/CD Based Training, Dedicated/Direct Gov't Sales Manager, In-Service Training with Every Order.
TO ORDER: To order, please contact the Altec Account Manager listed above. **Pricing valid for 45 days**
NOTES
PAINT COLOR: White to match chassis, unless otherwise specified Altec Account Manager: Rhawnie Kraak
PRICING: Altec will make every effort to honor this quotation, subject to the following provisions. Prices for equipment with production start dates 12 months and beyond are considered budgetary due to potential cost inflation, market volatility, and tariff implications. These prices will be reviewed based on market conditions and confirmed closer to the production date. Quotes and orders with chassis model years beyond the current open order bank are estimates only. Altec's turn-key pricing is subject to change based on chassis pricing received from the OEM.
Chassis model year, specifications, and price will be reviewed and confirmed when specific model year information becomes available from the OEM, and any chassis price difference, including adjustments for tariffs, will be passed through to the customer.
Altec Industries, Inc.
SOURCEWELL OPTIONS ON CONTRACT (Unit)
SOURCEWELL OPTIONS ON CONTRACT (General)
OPEN MARKET ITEMS (Customer Requested)
ADDITIONAL ITEMS (items are not included in total above) AT41S
Quoted for: City of Visalia
Sourcewell 110421-ALT Quote Template - Q1-2026 (11)
677
From: Steve Ellis
To: Danny Galindo
Cc: Steve Ellis
Subject: Sent from Snipping Tool 416915
Date: Monday, March 23, 2026 2:08:00 PM
Attachments: image001.png
image002.png
Steve Ellis
Fleet Maintenance Supervisor
336 North Ben Maddox Way • Visalia, CA 93292
P: 559-713-4182
E: [email protected]
A BETTER WAY OF LIVING Visalia.gov
678
679
680
681
682
683
684
685
686
687
688
689
690
691
692
693
694
695
696
697
698
699
700
701
702
703
704
705
706
707
708
709
710
711
712
713
714
715
716
Altec #110421-ALT
Pricing for contract #110421-ALT offers Sourcewell participating agencies the following discounts:
• Up to a 5% discount off list price
• Up to a 28.6% discount off the typical seller’s fee on items purchased through JJ Kane Auctioneers (an Altec Company)
717
Rating
1-10
Rating
1-5
X Specialty Vehicle yes no
Recommendations:
Vehicle Description:
Year: Mileage \ Hours: Completed By: (Print Name & Initial) Vehicle #: Make: Model:
416915 Ford F550
2009 104,495 S.Ellis
10 ENGINE:
Engine has recently had a fuel system issue. Quote to repair is $24,000.00 with no garuntee it will remedy the issue. This is becoming a common issue among our light fleet diesel powered vehicles. 5 5
5 3
4 3
3 38
Transmission/Differential:
Transmission has discolored fluid. Wire harnesses are becoming brittle Power Take Off:
Hydrualic hoses and motors are having continuous leaks requiring special maintenance to be performed only by Altec technicians causing continuous down time.
Chassis Outside: (including tires, brakes & windows)
tires and brakes are showing normal wear and tear. Glass is good. Service body needs paint.
Toolboxes and shelving showing wear and tear close to failure in some areas.
Suspension System:
Showing normal wear and tear. But could be causeing some of the premature tire wear on the front axle.
Vehicle Interior:
Seat and floorboards are worn. Harnesses are beginning to fall from the dash and have several Cooling System:
Good condition but, hoses will need replacment upon repair of the fuel system.
Steering System:
Heavy Eqipment: 0-15=Excellent, 16-30=Good, 31-45=Fair, 46-60=Poor Light Eqipment: 0-11=Excellent, 12-25=Good, 26-37=Fair, 38-50=Poor Vehicle Evaluation Form
Rating Guide: (1-10) 1=Excellent to 10=Unservicable; (1-5) 1=Excellent to 5= Unservicable areas that have been tied back up under the dash. Dash is cracked and some controls are loose.
Component: (Comments)
Component: (Comments)
Total Scoring Key:
Steering components showing regulare wear and tear,
718
719
Visalia City Council
Staff Report
Visalia City Council
707 W. Acequia
Visalia, CA 93291
File #: 25-0741 Agenda Date: 4/6/2026 Agenda #: 15.
Agenda Item Wording:
Award a contract to Ray Gaskin Service for parts and service- Authorize the City Manager to award an annual contract to Ray Gaskin Service for service, repair, and parts for New Way refuse truck bodies. The contract shall not exceed $150,000 annually, totaling $750,000 over the term of the contract, with an option to renew annually for up to (4) additional one-year terms.
Agenda Date: 04/06/2026
Prepared by:
Danny Galindo, Public Works Manager, [email protected] , 713-4186 Nick Bartsch, Public Works Director, [email protected] ,713-4052 Department Recommendation: Staff recommends that the City Council authorize the City Manager to award an annual contract to Ray Gaskin Service for service, repair, and parts for New Way refuse truck bodies. The contract shall not exceed $150,000 annually, totaling $750,000 over the term of the contract, with an option to renew annually for up to (4) additional one-year terms.
Summary:
The Solid Waste Division currently operates over 25 commercial front-load trucks that require ongoing parts and service. Ray Gaskin Service is the authorized regional dealer for New Way, located in Bakersfield, and has provided a sole-source letter indicating such. Staff is requesting an annual contract for parts and services provided by Ray Gaskin Service.
Background Discussion:
Ruckstell California Sales Co. was previously the authorized dealer for New Way refuse truck equipment. New Way has since removed Ruckstell and designated Ray Gaskin Service as the authorized dealer for this region.
The City of Visalia operates over 25 refuse truck bodies manufactured by New Way. To maintain fleet reliability and operational consistency, timely access to specialized parts, repairs, and service is essential. Utilizing the authorized dealer ensures compatibility, warranty compliance, and proper maintenance of this equipment.
Fiscal Impact including annual maintenance and operating costs:
Expenditures are paid initially out of the Fleet Maintenance Fund. These costs are then charged to the vehicle user department monthly, as incurred.
Prior Council Action: None
Alternatives: None recommended
Visalia City Council Page 1 of 2 Printed on 4/2/2026
powered by Legistar™720
File #: 25-0741 Agenda Date: 4/6/2026 Agenda #: 15.
Recommended Motion (and Alternative Motions if expected):
I motion to authorize the City Manager to award an annual contract to Ray Gaskin Service for service, repair, and parts for New Way refuse truck bodies. The contract shall not exceed $150,000 annually, totaling $750,000 over the term of the contract, with an option to renew annually for up to (4) additional one-year terms.
Environmental Assessment Status: N/A
CEQA Review: N/A
Deadline for Action: 04/06/2026
Attachments:
Sole Source Letter
Pricing
Levine Act
Strategic Goal: Indicates which City Strategic Goal(s) this item supports. Check all that apply. ☐
Economic
Vitality
☒
Organizational
Excellence
☐
Fiscal
Strength
☐
Infrastructure &
Growth
☐
Quality of
Life
Visalia City Council Page 2 of 2 Printed on 4/2/2026
powered by Legistar™721
Parts Manager: Tim Dvorak; [email protected]
Sr. Parts Specialist: Keith Kult; [email protected] Replacement Parts for Municipal Customers
DATE: 6/4/2025
Dear City of Visalia,
I am writing to inform you that Ray Gaskin Service is our sole source distributor of New Way® & ROTO PAC® parts and service, for your area.
Our distributor territories are protected, and we do not allow other distributors to ship into areas that they do not service. If you have any questions on this matter, please feel free to call us.
Keep in mind that the use of parts and other assemblies from another manufacturer as substitutes for New Way original equipment manufacturer (OEM) products WILL void a unit’s limited warranty.
Sincerely,
Keith Kult
Senior Parts Specialist
722
Exhibit No. _______
The following disclosure and statement apply to the Bidder/Proposer/Contractor/Consultant/ Vendor/Supplier or Company:
1. submitting a bid or proposal in response to a solicitation by City of Visalia; or
2. as Awardee of a contract/purchase order which is subject to approval by the Visalia City Council.
OWNERSHIP DISCLOSURE
____________________________________________________________________________ Name of Bidder/Proposer/Contractor/Consultant/Vendor/Supplier or Company _________________________________________________________________________________________________________ Address
List the names of all principals, partners, and/or trustees. For corporations, provide names of officers, directors and all stockholders owning more than 10% equity interest in corporation:
_________________________________________________________________________________________ _________________________________________________________________________________________ _________________________________________________________________________________________ _________________________________________________________________________________________
CALIFORNIA LEVINE ACT STATEMENT
California Government Code Section 84308, also know as the “Levine Act,” can prohibit members of the Visalia City Council from participating in any action related to a contract if he or she receives any political contributions totaling more than $250 within the previous twelve (12) months, and for twelve (12) months following the date a final decision concerning the contract has been made, from the person or company awarded the contract. The Levine Act also requires disclosure of such contribution(s) by a party to be awarded a specific contract.
The following website contains a list of current Visalia City Council Members, https://www.visalia.city/government/city_council/default.asp . You are responsible for reviewing the names of Visalia City Council Members prior to making the following disclosure:
1. Have you or your company, or any agent on behalf of you or your company, made any political contributions of more than $250 to a Visalia City Council Member in the twelve (12) months preceding the date of the submission of your proposals or the anticipated date of any City Council action related to this contract? YES:_____ NO:_____. If yes, please identify the City Council Member(s) and date(s) of contribution in the space below:
Council Member(s) Name Date of Contribution(s)
Answering YES, does not preclude the City of Visalia from awarding a contract to your firm or from taking any subsequent action related to the contract. It does, however, preclude the identified Visalia City Council Member(s) from participating in any actions related to this contract.
NOTICE: The disclosure duty under state law continues for twelve (12) months after the award. If the above information regarding contributions changes during this time after the award, then the awardee is required to update this disclosure form.
____________________________________________________________________________ Print or Type Name of Bidder/Proposer/Contractor/Consultant/Supplier/Vendor/Company __________________________________________ _____________________________ Signature of Company Authorized Individual Print or Type Name of Authorized Individual Ray Gaskin Service
14572 Rancho Vista Dr. Fontana, CA 92335
William McIntosh- President
Patrick McIntosh- Vice President
Lori McIntosh- Secretary
Shawn McIntosh- Treasure
X
Ray Gaskin Service
Bobby Ziello
723
RGS
RAY GASKIN SERVICE
14572 RANCHO VISTA DR.
FONTANA, CA 92335
PHONE: 909-574-7000 FAX: 909-574-7005
Whom it may concern,
This letter is intended for the City of Visalia to state both labor cost and parts pricing. Ray Gaskin Service has a standard labor rate of $196 per hour for both inhouse and on-site labor. Ray Gaskin Service also offers an emergency labor rate for after hours of $294 per hour. All parts will be sold to the city at the manufacturer’s suggested list price.
Sincerely,
Bobby Ziello
Ray Gaskin Service
Sales Manager
724
Visalia City Council
Staff Report
Visalia City Council
707 W. Acequia
Visalia, CA 93291
File #: 25-0745 Agenda Date: 4/6/2026 Agenda #: 16.
Agenda Item Wording:
Authorization for payment to Ray Gaskin Service- Authorize the payment of Ray Gaskin invoices for parts for refuse truck bodies in the amount of $113,413.93.
Agenda Date: 04/06/2026
Prepared by:
Danny Galindo, Public Works Manager, [email protected] <mailto:[email protected]> , 713- 4186
Nick Bartsch, Public Works Director, [email protected] <mailto:[email protected]> ,713-4052 Department Recommendation: Staff recommends that the City Council authorize the payment of outstanding invoices from Ray Gaskin Service totaling $113,413.93 for parts ordered for repairs on New Way refuse truck bodies.
Summary:
The Solid Waste Division operates over 25 commercial front-load trucks daily, requiring ongoing parts and service. These repairs are performed regularly to keep the fleet operational. Payment of these invoices is necessary while staff works to establish a formal contract.
Background Discussion:
Multiple parts were required to complete repairs on the City’s New Way solid waste front-load trucks.
These parts were previously sourced through Ruckstell, the City’s contracted vendor. However, Ruckstell lost its dealership contract with New Way. Ray Gaskin Service is now the authorized local representative for New Way sales, parts, and service.
Due to an internal administrative issue, a formal agreement with the newly authorized dealer was not executed in a timely manner following this transition. As a result, services continued without an approved contract in place, and invoices accumulated over an extended period. Staff acknowledges this lapse and takes responsibility for the delay. Upon identification, staff initiated corrective action to formalize the agreement and bring forward all outstanding invoices for approval. Internal procedures are being reviewed and reinforced to ensure contracts are executed in advance of services and similar oversights do not occur in the future.
Fiscal Impact including annual maintenance and operating costs:
Expenditures are paid initially out of the Fleet Maintenance Fund (501). These costs are then charged to the vehicle user department monthly, as incurred.
Prior Council Action: None
Visalia City Council Page 1 of 2 Printed on 4/2/2026
powered by Legistar™725
File #: 25-0745 Agenda Date: 4/6/2026 Agenda #: 16.
Alternatives: None recommended
Recommended Motion (and Alternative Motions if expected):
I motion to authorize the payment of outstanding invoices to Ray Gaskin Service totaling $113,413.93.
Environmental Assessment Status: N/A
CEQA Review: N/A
Deadline for Action: 04/06/2026
Attachments:
Outstanding Invoice list
Strategic Goal: Indicates which City Strategic Goal(s) this item supports. Check all that apply. ☐
Economic
Vitality
☒
Organizational
Excellence
☐
Fiscal
Strength
☐
Infrastructure &
Growth
☐
Quality of
Life
Visalia City Council Page 2 of 2 Printed on 4/2/2026
powered by Legistar™726
Ray Gaskin Service - Outstanding Invoices
Sales Tax
Correction
Invoice # Date Invoice Amount Taxable Non-Taxable 0.085 Revised Invoice
Amount Variance
56095 03/17/2025 $ 239.36 $ 221.12 $ - $ 18.80 $ 239.92 $ (0.56) 56202 03/26/2025 $ 58.44 $ 27.64 $ 28.52 $ 2.35 $ 58.51 $ (0.07) 56934 06/04/2025 $ 232.56 $ 190.10 $ 26.78 $ 16.16 $ 233.04 $ (0.48) 56982 06/09/2025 $ 222.81 $ 177.60 $ 30.56 $ 15.10 $ 223.26 $ (0.45) 57011 06/10/2025 $ 594.76 $ 449.00 $ 108.72 $ 38.17 $ 595.89 $ (1.13) 57131 06/30/2025 $ 10,855.05 $ 8,194.04 $ 1,985.00 $ 696.49 $ 10,875.53 $ (20.48) 57202 06/26/2025 $ 2,266.37 $ 1,777.47 $ 342.26 $ 151.08 $ 2,270.81 $ (4.44) 57309 07/09/2025 $ 7,477.73 $ 6,474.90 $ 468.65 $ 550.37 $ 7,493.92 $ (16.19) 57457 07/23/2025 $ 2,813.72 $ 2,516.91 $ 89.16 $ 213.94 $ 2,820.01 $ (6.29) 57628 08/06/2025 $ 82.58 $ 57.69 $ 20.13 $ 4.90 $ 82.72 $ (0.14) 57675 08/12/2025 $ 412.17 $ 264.21 $ 126.16 $ 22.46 $ 412.83 $ (0.66) 57763 08/19/2025 $ 491.38 $ 453.93 $ 38.58 $ 492.51 $ (1.13) 57845 08/27/2025 $ 2,210.08 $ 2,041.64 $ 173.54 $ 2,215.18 $ (5.10) 57855 08/27/2025 $ 1,848.09 $ 1,707.24 $ 145.12 $ 1,852.36 $ (4.27) 57871 09/02/2025 $ 28,254.65 $24,946.56 $ 1,250.00 $ 2,120.46 $ 28,317.02 $ (62.37) 57988 09/05/2025 $ 46.44 $ 42.90 $ 3.65 $ 46.55 $ (0.11) 58436 10/14/2025 $ 547.02 $ 472.11 $ 35.96 $ 40.13 $ 548.20 $ (1.18) 58580 10/27/2025 $ 27,504.65 $24,946.56 $ 500.00 $ 2,120.46 $ 27,567.02 $ (62.37) 58797 11/11/2025 $ 479.83 $ 379.24 $ 69.30 $ 32.24 $ 480.78 $ (0.95) 58963 12/02/2025 $ 1,886.10 $ 1,691.16 $ 55.42 $ 143.75 $ 1,890.33 $ (4.23) 59231 12/17/2025 $ 4,608.83 $ 3,286.07 $ 1,051.66 $ 279.32 $ 4,617.05 $ (8.22) 59255 12/18/2025 $ 138.56 $ 128.00 $ 10.88 $ 138.88 $ (0.32) 59435 01/06/2026 $ 18,311.23 $16,735.56 $ 194.99 $ 1,422.52 $ 18,353.07 $ (41.84) 59572 01/15/2026 $ 270.63 $ 250.00 $ 21.25 $ 271.25 $ (0.62) 59573 01/15/2026 $ 411.35 $ 380.00 $ 32.30 $ 412.30 $ (0.95) 59701 01/29/2026 $ 120.16 $ 84.84 $ 28.32 $ 7.21 $ 120.37 $ (0.21) 59984 02/24/2026 $ 782.84 $ 723.18 $ 61.47 $ 784.65 $ (1.81) Total $ 113,167.39 $ 113,413.93 $ (246.54)
*All Invoices received from vendor on 3/17/2026, email attached 727
1 Errica Salinas
From: Steve Ellis
Sent: Thursday, March 26, 2026 9:03 AM
To: Errica Salinas
Cc: Steve Ellis
Subject: FW: Invoices from Ray Gaskin Service
Attachments: Inv_56095_from_Ray_Gaskin_Service_1866281_14236.pdf; Inv_59984 _from_Ray_Gaskin_Service_2071303_14236.pdf; Inv_57675_from_Ray_Gaskin_Service_ 1950049_14236.pdf; Inv_57855_from_Ray_Gaskin_Service_1958260_14236.pdf; Inv_57457 _from_Ray_Gaskin_Service_1940236_14236.pdf; Inv_57628_from_Ray_Gaskin_Service_ 1947165_14236.pdf; Inv_57202_from_Ray_Gaskin_Service_1927140_14236.pdf; Inv_59701 _from_Ray_Gaskin_Service_2056256_14236.pdf; Inv_58797_from_Ray_Gaskin_Service_ 2001886_14236.pdf; Inv_57763_from_Ray_Gaskin_Service_1954534_14236.pdf; Inv_57131 _from_Ray_Gaskin_Service_1929530_14236.pdf; Inv_59435_from_Ray_Gaskin_Service_ 2034970_14236.pdf; Inv_56934_from_Ray_Gaskin_Service_1915511_14236.pdf; Inv_57845 _from_Ray_Gaskin_Service_1957827_14236.pdf; Inv_57988_from_Ray_Gaskin_Service_ 1962309_14236.pdf; Inv_59572_from_Ray_Gaskin_Service_2042076_14236.pdf; Inv_57309 _from_Ray_Gaskin_Service_1933761_14236.pdf; Inv_59231_from_Ray_Gaskin_Service_ 2020917_14236.pdf; Inv_59573_from_Ray_Gaskin_Service_2042104_14236.pdf; Inv_58963 _from_Ray_Gaskin_Service_2012889_14236.pdf; Inv_57011_from_Ray_Gaskin_Service_ 1919522_14236.pdf; Inv_56982_from_Ray_Gaskin_Service_1917774_14236.pdf; Inv_59255 _from_Ray_Gaskin_Service_2022529_14236.pdf; Inv_57871_from_Ray_Gaskin_Service_ 1959610_14236.pdf; Inv_56202_from_Ray_Gaskin_Service_1872131_14236.pdf; Inv_58580 _from_Ray_Gaskin_Service_1991780_14236.pdf; Inv_58436_from_Ray_Gaskin_Service_ 1983616_14236.pdf
Steve Ellis
Fleet Maintenance Supervisor
From: Accounts Payable <[email protected]>
Sent: Tuesday, March 17, 2026 4:00 PM
To: Steve Ellis <[email protected]>
Subject: FW: Invoices from Ray Gaskin Service
From: "Intuit E-Commerce Service" <[email protected]> Sent: Tuesday, March 17, 2026 11:11 AM
To: Ryan Gonzalez <[email protected]>
Cc: Accounts Payable <[email protected]>
Subject: Invoices from Ray Gaskin Service
728
2 ray gaskin service 2025
Email: [email protected]
Phone: 909-574-7000
Powered by QuickBooks.
Dear Visalia, City of,
Please find your invoices attached.
Thank you for your business. We appreciate it very much.
Sincerely,
Ray Gaskin Service
Here’s a list of all your due invoices:
Invoice No. Due date Amount Action
56095 04/16/2025 239.36
Pay offline
(cash, check or other modes)
56202 04/25/2025 58.44
Pay offline
(cash, check or other modes)
56934 06/04/2025 232.56
Pay offline
(cash, check or other modes)
56982 06/09/2025 222.81
Pay offline
(cash, check or other modes)
57011 06/10/2025 594.76
Pay offline
(cash, check or other modes)
57202 06/26/2025 2,266.37
Pay offline
(cash, check or other modes)
57131 07/30/2025 10,855.05 Pay offline
729
3 (cash, check or other modes)
57309 08/08/2025 7,477.73
Pay offline
(cash, check or other modes)
57675 08/12/2025 412.17
Pay offline
(cash, check or other modes)
57457 08/22/2025 2,813.72
Pay offline
(cash, check or other modes)
57628 09/05/2025 82.58
Pay offline
(cash, check or other modes)
57763 09/18/2025 491.38
Pay offline
(cash, check or other modes)
57855 09/26/2025 1,848.09
Pay offline
(cash, check or other modes)
57845 09/26/2025 2,210.08
Pay offline
(cash, check or other modes)
57871 10/02/2025 28,254.65
Pay offline
(cash, check or other modes)
57988 10/05/2025 46.44
Pay offline
(cash, check or other modes)
58436 11/13/2025 547.02
Pay offline
(cash, check or other modes)
58580 11/26/2025 27,504.65
Pay offline
(cash, check or other modes)
58797 12/11/2025 479.83
Pay offline
(cash, check or other modes)
730
4 58963 01/01/2026 1,886.10
Pay offline
(cash, check or other modes)
59231 01/16/2026 4,608.83
Pay offline
(cash, check or other modes)
59255 01/17/2026 138.56
Pay offline
(cash, check or other modes)
59435 02/05/2026 18,311.23
Pay offline
(cash, check or other modes)
59572 02/14/2026 270.63
Pay offline
(cash, check or other modes)
59573 02/14/2026 411.35
Pay offline
(cash, check or other modes)
59701 02/28/2026 120.16
Pay offline
(cash, check or other modes)
59984 03/26/2026 782.84
Pay offline
(cash, check or other modes)
If you do not recognize the sender or the transaction, reach out to [email protected] Intuit, Inc. All rights reserved. Privacy | Security | Terms of service 731
Visalia City Council
Staff Report
Visalia City Council
707 W. Acequia
Visalia, CA 93291
File #: 25-0751 Agenda Date: 4/6/2026 Agenda #: 17.
Agenda Item Wording:
Approve purchase of solid waste pilot electric truck - Approve the purchase of one 2025 model year solid waste electric residential side loader demonstrator truck from Haaker, Inc. through the Sourcewell Cooperative in the amount of $876,368.58 and appropriate $876,368.58 from the Solid Waste Enterprise Fund.
Agenda Date: 04/06/2026
Prepared by: Jason Serpa, Public Works Manager, 713-4533, [email protected]; Nick Bartsch, Public Works Director, 713-4052, [email protected] Department Recommendation: Staff recommends that Council approve the purchase of one 2025 model year solid waste electric residential side loader demonstrator truck from Haaker, Inc. in the amount of $876,368.58 and appropriate $876,368.58 from the Solid Waste Enterprise Fund.
Summary:
Staff are recommending the purchase of an all-electric 2025 model year McNeilus Volterra solid waste demonstrator side loader truck. After extensive research and comparisons of capable models, including reference work of other operators in California, staff is confident in the performance of the electric truck and its ability to do the work of the City’s standard internal combustion alternatives.
Coupled with the available incentives from the Air Board and HVIP to lower the upfront capital cost, the timing is optimal to purchase and pilot this all-electric model. The fact that the truck could be repaired in Tulare as needed, is also an asset.
Background Discussion:
The State of California and the California Air Resources Board have mandated that State and local agencies begin converting their heavy-duty fleets to zero-emission beginning January 1, 2024.
Currently, there are two effective options, battery-electric and hydrogen fuel cell vehicles.
Unfortunately, low-emission Compressed Natural Gas (CNG) does not qualify towards meeting the mandated regulation. Due to the lack of hydrogen fuel-cell vehicles entering the market, batteryelectric technology is currently the only commercially available and logistically feasible option in the market today. City staff recognize the immediate need to pilot an electric solid waste truck for a longterm benefit of testing, while also developing a possible strategy and pathway to successfully satisfy the Advanced Clean Fleets (ACF) requirements.
Historically, the City of Visalia Solid Waste Division has procured a mix of CNG and diesel fueled vehicles to replace or grow the solid waste fleet. Due to the zero-emission regulations in the State of California, the City began the process of researching alternative fuel vehicles, and subsequently, the viability and affordability of purchasing an electric solid waste truck. Staff took the approach of studying various types of electric truck products available for sale, then coming to a recommendation based on the performance and future ownership costs of the vehicle.
Visalia City Council Page 1 of 4 Printed on 4/2/2026
powered by Legistar™732
File #: 25-0751 Agenda Date: 4/6/2026 Agenda #: 17.
After reviewing products from multiple battery-electric truck manufacturers and being able to demo several trucks on the City’s routes, one manufacturer performed better than its competitors. Due to the ease of operation, purpose-built design for reduced maintenance and equipment longevity, and perhaps most importantly, battery efficiency, the McNeilus/Volterra is the preferred and recommended option, having the ability to perform the same duties as the City’s current internal combustionpowered equipment.
With any new technology or product, there is a need to do due diligence by contacting other cities and private operators that are running the specific electric truck product staff is considering.
Additionally, the specific truck under consideration was tested for 2 full days onsite so that Solid Waste staff along with Fleet Maintenance personnel could weigh in on the truck’s capabilities and/or drawbacks.
Even through initially testing new electric truck technology and getting good references, staff understand that with any new technology, extended testing, specific to the City of Visalia and its solid waste operation, is most valuable before a more extensive investment of converting the entire fleet and installing charging infrastructure is made. This is why staff is proposing a pilot as the best option.
The pilot would purchase one truck, put that truck into service, and observe the compatibility and comparability of operational costs. Subsequent purchases would then be evaluated and considered upon the successful performance of the pilot truck.
Fiscal Impact including annual maintenance and operating costs:
After the selective process of choosing an electric model that could take the place of one of the City’s CNG equivalents, staff recommend the McNeilus Volterra. This truck had the most upside in range, capacity, and good references (See previously given presentation attached). In addition, having a local dealer in Tulare, CA was a positive for support contact and warranty parts and repairs, if needed.
Haaker, Inc. is the McNeilus dealer in the area and is able to extend pricing according to a Sourcewell Cooperative contract (Contract# 110223-MCN). Sourcewell Cooperative Purchasing helps the City save time and money by purchasing from ready-to-use, competitively solicited contracts. Cooperative Purchasing is “Procurement conducted by, or on behalf of, one or more Public Procurement Units,” as defined by the American Bar Association Model Procurement Code for State and Local Governments. Sourcewell streamlines the purchasing process by developing Requests for Purchase for national competitive solicitations that meet or exceed local requirements.
The electric truck pilot will be an addition to the fleet as a growth vehicle and take the place of one of the two growth vehicles that staff is planning to take to Council before the end of FY25/26. Even though this electric truck will serve as a pilot program, staff feels that it is capable enough to be an addition to the fleet and can help in savings by taking the place of an already planned growth vehicle.
Staff was also given the option of purchasing a brand new 2026 model year truck or an identical demonstrator 2025 model year truck with 1,781 miles on the odometer. Because the trucks were identical, staff has chosen to recommend the 2025 demo truck for less cost.
The cost breakdown of the demo truck and additional equipment is below, along with the appropriation needed for this purchase to Haaker, Inc., the local McNeilus dealer.
CIP Project #
Total Amount
Budgeted
Demo Electric
Truck Initial Charger
Appropriation
Needed
NEW CIP $0.00 $848,035.38 $28,333.20 $876,368.58
Visalia City Council Page 2 of 4 Printed on 4/2/2026
powered by Legistar™733
File #: 25-0751 Agenda Date: 4/6/2026 Agenda #: 17.
CIP Project #
Total Amount
Budgeted
Demo Electric
Truck Initial Charger
Appropriation
Needed
NEW CIP $0.00 $848,035.38 $28,333.20 $876,368.58
City staff was also able to obtain an HVIP grant (Hybrid and Zero-Emission Truck and Bus Voucher Incentive Project) in the amount of $150,000 which will be issued as a reimbursement after the initial purchase. There is also a possibility of being able to stack an additional Air Board Truck Replacement Program grant (which the City has already qualified and contracted for) in the amount of $120,832, dependent on the type of funding we receive from HVIP. Even though these amounts are a cost reduction to the initial capital needed to purchase the electric truck, the appropriation amount above is not inclusive of the reductions since they are considered reimbursements.
CNG versus Electric:
Even though the initial capital investment of a battery-electric-powered truck is greater than its CNGpowered equivalent that the City is accustomed to purchasing, staff have prepared a side-by-side comparison of the expected 10-year life costs of the electric-powered options compared to the City’s typical internal combustion-powered natural gas vehicle. As seen below, the initial capital to purchase the electric truck is higher, but the electric truck does make strides in payback by year ten (in accordance with the City’s current vehicle replacement schedule), achieving an anticipated near equal total cost of ownership, with maintenance and fuel being the greatest in contrast. Staff would like to note that due to State requirements, diesel trucks are no longer considered a viable option to purchase and will be unavailable in the future, so it is not considered in the comparisons below. 10-year Electric VS CNG Comparison
CNG Electric Demo Electric New
Purchase Price $527,371.08 $848,035.38 $931,171.35
Initial Charger $0.00 $28,333.20 $28,333.20
Grant Dollars HVIP $0.00 ($150,000.00) ($150,000.00)
Total Purchase Price (including tax) $527,371.08 $726,368.58 $809,504.55 Estimated Repairs (related to Parts & Labor) $285,919.67 $209,035.87 $209,035.87 Estimated Preventative Maintenance $38,082.29 $19,041.14 $19,041.14 Estimated Fuel $152,433.44 $114,478.50 $114,478.50
Total Cost of Ownership (Annual) $1,003,806.48 $1,068,924.09 $1,152,060.06 *For details on the assumptions made to make the above comparison, please see the pilot presentation attached to this staff report.
**Only one grant amount is shown as a cost reduction in the figure above. An additional $120,832 may reduce the electric price if the grant is stackable after the HVIP voucher is issued to the City.
Even though staff is recommending the purchase of an identical 2025 model year demonstrator electric truck with 1,781 miles, the new 2026 model year purchase truck option and price are also listed in the comparison above and given as an alternative buying option and motion below. The new 2026 electric McNeilus Volterra would be an additional $83,135.97. Both model year trucks are Visalia City Council Page 3 of 4 Printed on 4/2/2026
powered by Legistar™734
File #: 25-0751 Agenda Date: 4/6/2026 Agenda #: 17.
2026 electric McNeilus Volterra would be an additional $83,135.97. Both model year trucks are identical in equipment and technology.
Prior Council Action: Council has approved Diesel and CNG truck purchases in the past for budgeted replacements and growth vehicles.
Alternatives: Alternative #1: To not approve the purchase of a pilot solid waste electric truck.
Alternative #2: (if Council chooses to alternatively purchase the new electric McNeilus Volterra): I move to approve the purchase of a new electric pilot 2026 model year solid waste residential side loader truck from Haaker, Inc. through the Sourcewell Cooperative in the amount of $959,504.55 and appropriate $959,504.55 from the Solid Waste Enterprise Fund.
Recommended Motion (and Alternative Motions if expected):
I move to approve the purchase of an electric pilot 2025 model year solid waste residential side loader demo truck from Haaker, Inc. through the Sourcewell Cooperative in the amount of $876,368.58 and appropriate $876,368.58 from the Solid Waste Enterprise Fund.
Environmental Assessment Status: N/A
CEQA Review: N/A
Deadline for Action: 04/06/2026
Attachments: Vehicle Authorization Form, McNeilus Sourcewell Contract, Sourcewell Pricing Quote - Demo Truck, Sourcewell Pricing Quote - New Truck, Electric Pilot Truck Presentation, Electric Pilot Truck Presentation Staff Report
Strategic Goal: Indicates which City Strategic Goal(s) this item supports. Check all that apply. ☐
Economic
Vitality
☐
Organizational
Excellence
☐
Fiscal
Strength
☒
Infrastructure &
Growth
☐
Quality of
Life
Visalia City Council Page 4 of 4 Printed on 4/2/2026
powered by Legistar™735
736
737
738
739
740
741
742
743
744
745
746
747
748
749
750
751
752
753
754
755
756
757
758
759
760
761
762
763
764
765
766
767
768
769
770
771
772
773
4490 South K Street, Tulare, CA 93274
(559) 220-8897 ~ haakerrefuse.com
QUOTE
February 9, 2026
TO: CITY OF LOS VISALIA ATTN: JASON SERPA
336 N. BEN MADDOX WAY (559) 715-4533
VISALIA, CA 93292 [email protected]
In accordance with your request, we are pleased to submit the following proposal for your consideration and approval based on the Sourcewell Cooperative Purchasing Agreement – Contract #110223-MCN.
ONE (1) DEMO McNEILUS VOLTERRA ZSL
VIN: 4M9CGDKFXSM265081
Electric 40-Yard Zero Radius Automated Side Loader.
STANDARD AND OPTIONAL EQUIPMENT INCLUDES: CHASSIS CHASSIS TYPE MCNEILUS CHASSIS CHASSIS MAKE MCNEILUS CHASSIS MODEL VOLTERRA CHASSIS MODEL YEAR 2025 CHASSIS VIN YEAR 2025 RISE TABLET MOUNT INSTALLED NO FUEL TYPE ELECTRIC BATTERY PACK PRIMARY FUEL SYSTEM ELECTRIC PROPULSION SYSTEM EV BATTERY CAPACITY 3-STRING 498 KWH CHARGE PORT MODEL SAE J1772CCS1 200-AMP CHARGE PORT LOCATION CENTER, FOV, BELOW WINDSHIELD PUMP DRIVE BODY MOUNTED ELECTRIC MOTOR STEERING CONFIGURATION CURB SIDE SEATED STEERING CAB SEATS CS AIR / SS FIXED CAB MIRRORS HEATED ELECTRIC CAB MIRRORS FRONT RECOVERY HOOK BUMPER MOUNTED RECOVERY PIN REAR MUDFLAPS BLACK MCNEILUS LOGO NOISE GENERATOR TRUE BODY CAPACITY ZSL 31YD LNG FLR LRG TG LO PRO BODY FLOOR THICKNESS 3/16" AR200 (HEAVY DUTY) HOPPER FLOOR 3/16" AR400 TG BUMPER WIDTH 96 INCHES TG SEAL HARD RUBBER SEAL BODY OPTIONS HOPPER TOP DOOR TOP DOOR W/O BRUSH SKIRT JOYSTICK STYLE INTEGRATED JOYSTICK CS OUTSIDE CONTROLS FRONT FENDER TG BODY ARM UP FLASHING LED IN DASH DISPLAY TAILGATE PROP OPENING STANDARD OPENING PACKER FOLLOWER STANDARD 10GA 50KSI PANEL PACKER FOLLOWER HINGE COVER YES, INCLUDED IN EVERY TRUCK X-WEAR IS STANDARD YES, INCLUDED IN EVERY TRUCK CLEANOUT DOOR SPILL TRAY CURB SIDE AND STREET SIDE HYDRAULICS HYDRAULIC RESERVOIR STEEL CS INSIDE OF BODY HYDRAULIC FLUID CASTROL HV32 DUAL RANGE HYD RESERVOIR FLUSH QD #16 MALE QD SUC AND #16 MALE RET HYDRAULIC RETURN FILTER IN-TANK FILTER FILL THROUGH FILTER #16 MALE QD IN FILTER TUBE HYDRAULIC PUMP DUAL AXIAL PISTON PUMPS PACKER/EJECTOR CYLINDER MAILHOT RES SUCTION SHUTOFF VALVE BALL VALVE W/ YELLOW HANDLE LOW HYD OIL LEVEL WARNING OIL LEVEL BUILT IN CAB DISPLAY TEMP SENSOR IN RESERVOIR YES, INCLUDED IN EVERY TRUCK TELL TALE HYD TEMP GAUGE BUILT INTO DISPLAY HYD FLUID SAMPLE PORT CHECK FLUID KP14NV 90DEG PRESSURE TEST PORT INTEGRATED READING IN DISPLAY SERVICE LIFT BODY SERVICE LIFT W/OUT PUMP LIGHTING LED LIGHT PACKAGE PROGRAMMABLE STROBE LIGHTS HOPPER LIGHTS ONE GROTE ROUND LED ARM WORK LIGHTS ONE GROTE ROUND LED MID BODY WORK LIGHTS BOX MTD GROTE LED MID-BODY DOT OVAL LIGHT OVAL AMBER TURN SIGNAL/MARKER CENTER STOP LIGHT GROTE LIGHT CENTER OF TG TG STROBE ACTIVATION ACTIVATED WHEN BODY ENABLED TG CAMERA ASSIST LIGHTS DUAL GROTE ROUND LED CAMERA CAMERA SYSTEM INTEGRATED 360 CAMERA SYSTEM TAILGATE CAMERA REAR VIEW IN 360 CAMERA SYSTEM CAB CAMERA SS VIEW IN 360 CAMERA SYSTEM ALLEY CAMERA ALLEY VIEW IN 360 CAMERA SYST HOPPER CAMERA HOPPER VIEW IN 360 CAMERA SYST ARM CAMERA ARM VIEW IN 360 CAMERA SYSTEM CAMERA DISPLAY INTEGRATED IN CAB DVR MOUNTED IN CAB DVR INTEGRATED W/ 360 CAM SYST ARMS AND FORKS ARM MODEL 12 FT EXTENDED REACH ARM-96GAL ARM FINGERS STANDARD FINGER GRABBER ARM CONTROLS CS JOYSTICK CONTROL AUTOLOAD INTEGRATED IN ARM CONTROLS GRABBER OPEN INTERLOCK INTEGRATED IN ARM CONTROLS MISC BODY CENTER BUMPER MOUNT TOOLBOX 16"D X 14"H X 24" W ALUMINUM SHOVEL ONE 11" PLASTIC SHOVEL HOLDER ON BODY CURB SIDE HOPPER WALL BROOM ONE BROOM HOLDER ON BODY (STRAP INCLUDED) CLEAN-OUT TOOL CLEANOUT HOE (BODY MOUNT) CLEAN OUT TOOL HOLDER BODY MOUNT WHEEL CHOCK HLD,SIDE OF BODY SINGLE ALUMINUM CURBSIDE HOLDER WITH 2 BLOCKS ROADWAY SIGN 32X96 SAFETY TRIANGLE SAFETY KIT BOLTED INSIDE BUMPER TOOL BOX 20 POUND FIRE EXTINGUISHER CS HEADFRAME MTD FIRE EXT FIRE EXTINGUISHER IN CAB NO ADDITIONAL FIRE EXT IN CAB FALL RESTRAINTS SALA HOOK ON ROOF SPILL KIT 20 EPI-CM SPILL KIT SPILL KIT MOUNTING LOC CS ICC BUMPER COLLISION WARNING SYSTEM INTEGRATED ZF ONGUARDMAX ADD TOP SPOT MIRROR CURBSIDE AND STREETSIDE BACKUP ALARM PRECO 1059 DUAL TONE PAINT 774
*Quoted pricing is based on the order date, except for tariffs, which are applied based on the equipment’s build date.
Any such tariffs will be documented and shared with you. Please note this price does not include potential future tariffs, including anticipated trade tariffs on raw materials in 2026 under the IEEPA and Section 232 of the Trade PAINT SCHEME PAINT LAYOUT ON FILE NUMBER OF BODY COLORS QTY 2 BODY PAINT CATEGORY 2 COLOR, MEDIUM COMPLEXITY BODY COLOR 1 DESCRIPTION MACK WHITE BODY COLOR 1 CODE HST914321 PRIMARY BODY COLOR SHADE LIGHT BODY COLOR 2 DESCRIPTION CANDY APPLE RED BODY COLOR 2 CODE HST500580 CAB / HOOD PAINT PACKAGE STANDARD STOCK PAINT SCHEME CONSPICUITY TAPE YES, INCLUDED IN EVERY TRUCK DECAL LANGUAGE ANSI COMPLIANT ENGLISH AUTOMATED ARM COLOR BLACK NUMBER OF CAB COLORS QTY 1 CAB PAINT CATEGORY 1 COLOR, MEDIUM COMPLEXITY CAB COLOR 1 DESCRIPTION AXALTA N0006 WHITE/L0006/905935 CAB COLOR 1 CODE HST938497 BATTERY PANEL COLOR DESCRIPTION AXALTA N0006 WHITE/L0006/905935 BATTERY PANEL COLOR CODE HST938497 PRIMARY BATTERY PANEL COLOR SHADE LIGHT AXLE ELECTRIC AXLE TANDEM ALLISON 100S, 2X23K LBS, GAWR DIFFERENTIAL LOCK TRUE FRONT TIRE SIZE 315/80R22.5 FRONT TIRE MAKE BRIDGESTONE TANDEM WHEEL CONFIGURATION DUAL TANDEM TIRE MAKE BRIDGESTONE REAR SUSPENSION HENDRICKSON HAULMAXX SPRING TAG AXLE QUANTITY ONE TAG MAKE/MODEL WATSON 13.5K STLK TAG WHEEL ENDS 10 STUD DUCTILE, HP TAG WHEEL MATERIAL ALUMINUM, CLEAN BUFF TAG TIRE BRIDGESTONE R250 255/70R 22.5 TAG TIRE ARRANGEMENT SINGLE DISHED INSIDE TAG AXLE LOCK TRUE AUX AXLE REGULATOR LOC SS BETWEEN CAB AND BODY AUX AXLE PRESSURE GAUGE INTEGRATED IN DASH DISPLAY SUBSCRIPTIONS CLEARSKY,8-YEAR,VOLTERRA SCALES PRICING FOR 1 UNIT:
BODY LIST PRICE: ........................................................................................... $ 795,774.00 SOURCEWELL AND HAAKER DISCOUNT ..................................................... ($ -38,499.00) BODY SUBTOTAL: ......................................................................................... $ 757,275.00 DEALER PREP / PDI: ............................................................................................ $ 1,200.00 TRAINING ........................................................................................................... $ 1,200.00 FREIGHT: ......................................................................................................... $ 15,000.00 UNIT SUBTOTAL: ............................................................................................ $ 774,675.00 SALES TAX (8.50%): ........................................................................................ $ 65,847.38 FLOORING: ......................................................................................................... $ 7,513.00 UNIT TOTAL PRICE: ....................................................................................... $ 848,035.38 Expansion Act.
THE PROPERTY HEREIN IS GUARANTEED BY MANUFACTURER'S WARRANTY ONLY AND SELLER MAKES NO WARRANTY EXPRESSED OR IMPLIED,
OF MERCHANTABILITY OR OTHERWISE, OR OF FITNESS FOR ANY PARTICULAR PURPOSE, THAT EXTENDS BEYOND THE ABOVE DESCRIPTION OF THE EQUIPMENT.
NOTE: Price is good for 90 Days . Cost increases due to the addition of Government mandated safety or environmental devices incurred after the date of this proposal, will be charged to you at our cost. Proof of such costs, if any, will be documented.
TAXES: SALES TAX applicable at time of delivery will be shown on our invoice. FEDERAL EXCISE TAXES, if applicable, will require payment unless a properly executed Exemption Certificate is submitted.
DELIVERY: 180-220 Days TERMS: Net Terms
Add-On/Cooperative Purchase Authorization: Haaker Equipment Company offers the above proposed price, terms and conditions to any governmental agency or subdivision in the State of California or Nevada for a period not to exceed a full calendar year from the date of original purchaser’s purchase order or contract.
We appreciate the opportunity to present this proposal and look forward to being of further and continued service.
HAAKER EQUIPMENT COMPANY ACCEPTED BY: BY: Matt Frazier DATE: MATT FRAZIER
SALES REPRESENTATIVE
775
4490 South K Street, Tulare, CA 93274
(559) 220-8897 ~ haakerrefuse.com
QUOTE
December 16, 2025
TO: CITY OF LOS VISALIA ATTN: JASON SERPA
336 N. BEN MADDOX WAY (559) 715-4533
VISALIA, CA 93292 [email protected]
In accordance with your request, we are pleased to submit the following proposal for your consideration and approval. Sourcewell Cooperative Purchasing Agreement – Contract #110223-MCN.
ONE (1) NEW McNEILUS VOLTERRA ZSL
Electric 40-Yard Zero Radius Automated Side Loader.
STANDARD AND OPTIONAL EQUIPMENT INCLUDES: CHASSIS CHASSIS TYPE MCNEILUS CHASSIS CHASSIS MAKE MCNEILUS CHASSIS MODEL VOLTERRA CHASSIS MODEL YEAR 2026 CHASSIS VIN YEAR 2026 RISE TABLET MOUNT INSTALLED NO FUEL TYPE ELECTRIC BATTERY PACK PRIMARY FUEL SYSTEM ELECTRIC PROPULSION SYSTEM EV BATTERY CAPACITY 3-STRING 498 KWH CHARGE PORT MODEL SAE J1772CCS1 200-AMP CHARGE PORT LOCATION CENTER, FOV, BELOW WINDSHIELD PUMP DRIVE BODY MOUNTED ELECTRIC MOTOR STEERING CONFIGURATION CURB SIDE SEATED STEERING CAB SEATS CS AIR / SS FIXED CAB MIRRORS HEATED ELECTRIC CAB MIRRORS FRONT RECOVERY HOOK BUMPER MOUNTED RECOVERY PIN REAR MUDFLAPS BLACK MCNEILUS LOGO NOISE GENERATOR TRUE BODY CAPACITY ZSL 31YD LNG FLR LRG TG LO PRO BODY FLOOR THICKNESS 3/16" AR200 (HEAVY DUTY) HOPPER FLOOR 3/16" AR400 TG BUMPER WIDTH 96 INCHES TG SEAL HARD RUBBER SEAL BODY OPTIONS HOPPER TOP DOOR TOP DOOR W/O BRUSH SKIRT JOYSTICK STYLE INTEGRATED JOYSTICK CS OUTSIDE CONTROLS FRONT FENDER TG BODY ARM UP FLASHING LED IN DASH DISPLAY TAILGATE PROP OPENING STANDARD OPENING PACKER FOLLOWER STANDARD 10GA 50KSI PANEL PACKER FOLLOWER HINGE COVER YES, INCLUDED IN EVERY TRUCK X-WEAR IS STANDARD YES, INCLUDED IN EVERY TRUCK CLEANOUT DOOR SPILL TRAY CURB SIDE AND STREET SIDE HYDRAULICS HYDRAULIC RESERVOIR STEEL CS INSIDE OF BODY HYDRAULIC FLUID CASTROL HV32 DUAL RANGE HYD RESERVOIR FLUSH QD #16 MALE QD SUC AND #16 MALE RET HYDRAULIC RETURN FILTER IN-TANK FILTER FILL THROUGH FILTER #16 MALE QD IN FILTER TUBE HYDRAULIC PUMP DUAL AXIAL PISTON PUMPS PACKER/EJECTOR CYLINDER MAILHOT RES SUCTION SHUTOFF VALVE BALL VALVE W/ YELLOW HANDLE LOW HYD OIL LEVEL WARNING OIL LEVEL BUILT IN CAB DISPLAY TEMP SENSOR IN RESERVOIR YES, INCLUDED IN EVERY TRUCK TELL TALE HYD TEMP GAUGE BUILT INTO DISPLAY HYD FLUID SAMPLE PORT CHECK FLUID KP14NV 90DEG PRESSURE TEST PORT INTEGRATED READING IN DISPLAY SERVICE LIFT BODY SERVICE LIFT W/OUT PUMP LIGHTING LED LIGHT PACKAGE PROGRAMMABLE STROBE LIGHTS HOPPER LIGHTS ONE GROTE ROUND LED ARM WORK LIGHTS ONE GROTE ROUND LED MID BODY WORK LIGHTS BOX MTD GROTE LED MID-BODY DOT OVAL LIGHT OVAL AMBER TURN SIGNAL/MARKER CENTER STOP LIGHT GROTE LIGHT CENTER OF TG TG STROBE ACTIVATION ACTIVATED WHEN BODY ENABLED TG CAMERA ASSIST LIGHTS DUAL GROTE ROUND LED CAMERA CAMERA SYSTEM INTEGRATED 360 CAMERA SYSTEM TAILGATE CAMERA REAR VIEW IN 360 CAMERA SYSTEM CAB CAMERA SS VIEW IN 360 CAMERA SYSTEM ALLEY CAMERA ALLEY VIEW IN 360 CAMERA SYST HOPPER CAMERA HOPPER VIEW IN 360 CAMERA SYST ARM CAMERA ARM VIEW IN 360 CAMERA SYSTEM CAMERA DISPLAY INTEGRATED IN CAB DVR MOUNTED IN CAB DVR INTEGRATED W/ 360 CAM SYST ARMS AND FORKS ARM MODEL 12 FT EXTENDED REACH ARM-96GAL ARM FINGERS STANDARD FINGER GRABBER ARM CONTROLS CS JOYSTICK CONTROL AUTOLOAD INTEGRATED IN ARM CONTROLS GRABBER OPEN INTERLOCK INTEGRATED IN ARM CONTROLS MISC BODY CENTER BUMPER MOUNT TOOLBOX 16"D X 14"H X 24" W ALUMINUM SHOVEL ONE 11" PLASTIC SHOVEL HOLDER ON BODY CURB SIDE HOPPER WALL BROOM ONE BROOM HOLDER ON BODY (STRAP INCLUDED) CLEAN-OUT TOOL CLEANOUT HOE (BODY MOUNT) CLEAN OUT TOOL HOLDER BODY MOUNT WHEEL CHOCK HLD,SIDE OF BODY SINGLE ALUMINUM CURBSIDE HOLDER WITH 2 BLOCKS ROADWAY SIGN 32X96 SAFETY TRIANGLE SAFETY KIT BOLTED INSIDE BUMPER TOOL BOX 20 POUND FIRE EXTINGUISHER CS HEADFRAME MTD FIRE EXT FIRE EXTINGUISHER IN CAB NO ADDITIONAL FIRE EXT IN CAB FALL RESTRAINTS SALA HOOK ON ROOF SPILL KIT 20 EPI-CM SPILL KIT SPILL KIT MOUNTING LOC CS ICC BUMPER COLLISION WARNING SYSTEM INTEGRATED ZF ONGUARDMAX ADD TOP SPOT MIRROR CURBSIDE AND STREETSIDE BACKUP ALARM PRECO 1059 DUAL TONE PAINT PAINT SCHEME PAINT LAYOUT ON FILE NUMBER OF BODY COLORS QTY 2 BODY PAINT CATEGORY 2 COLOR, MEDIUM COMPLEXITY BODY COLOR 1 DESCRIPTION MACK WHITE BODY COLOR 1 CODE HST914321 776 PRIMARY BODY COLOR SHADE LIGHT BODY COLOR 2 DESCRIPTION CANDY APPLE RED BODY COLOR 2 CODE HST500580 CAB / HOOD PAINT PACKAGE STANDARD STOCK PAINT SCHEME CONSPICUITY TAPE YES, INCLUDED IN EVERY TRUCK DECAL LANGUAGE ANSI COMPLIANT ENGLISH AUTOMATED ARM COLOR BLACK NUMBER OF CAB COLORS QTY 1 CAB PAINT CATEGORY 1 COLOR, MEDIUM COMPLEXITY CAB COLOR 1 DESCRIPTION AXALTA N0006 WHITE/L0006/905935 CAB COLOR 1 CODE HST938497 BATTERY PANEL COLOR DESCRIPTION AXALTA N0006 WHITE/L0006/905935 BATTERY PANEL COLOR CODE HST938497 PRIMARY BATTERY PANEL COLOR SHADE LIGHT AXLE ELECTRIC AXLE TANDEM ALLISON 100S, 2X23K LBS, GAWR DIFFERENTIAL LOCK TRUE FRONT TIRE SIZE 315/80R22.5 FRONT TIRE MAKE BRIDGESTONE TANDEM WHEEL CONFIGURATION DUAL TANDEM TIRE MAKE BRIDGESTONE REAR SUSPENSION HENDRICKSON HAULMAXX SPRING TAG AXLE QUANTITY ONE TAG MAKE/MODEL WATSON 13.5K STLK TAG WHEEL ENDS 10 STUD DUCTILE, HP TAG WHEEL MATERIAL ALUMINUM, CLEAN BUFF TAG TIRE BRIDGESTONE R250 255/70R 22.5 TAG TIRE ARRANGEMENT SINGLE DISHED INSIDE TAG AXLE LOCK TRUE AUX AXLE REGULATOR LOC SS BETWEEN CAB AND BODY AUX AXLE PRESSURE GAUGE INTEGRATED IN DASH DISPLAY SUBSCRIPTIONS CLEARSKY,8-YEAR,VOLTERRA SCALES PRICING FOR 1 UNIT:
UNIT PRICE: ................................................................................................... $ 862,863.13 SOURCEWELL AND HAAKER DISCOUNT ..................................................... ($ -35,499.00) BODY SUBTOTAL: ......................................................................................... $ 827,364.13 DEALER PREP / PDI: ........................................................................................... $ 1,200.00 SERVICE TRAINING: ............................................................................................ $1,550.00 FREIGHT: ........................................................................................................... $18,490.00 UNIT SUBTOTAL: ........................................................................................... $ 848,604.13 SALES TAX (8.50%): ............................................................................................................ $ 72,131.35 FLOORING: .......................................................................................................... $8,416.87 UNIT PRICE: VISALIA, CA: ................................................................................ $ 929,152.35 *PLUS EST. TARIFFS: ........................................................................................ $2,019.00
PLUS APPLICABLE DMV FEES
*Quoted pricing is based on the order date, except for tariffs, which are applied based on the equipment’s build date.
Any such tariffs will be documented and shared with you. Please note this price does not include potential future tariffs, including anticipated trade tariffs on raw materials in 2026 under the IEEPA and Section 232 of the Trade Expansion Act.
THE PROPERTY HEREIN IS GUARANTEED BY MANUFACTURER'S WARRANTY ONLY AND SELLER MAKES NO WARRANTY EXPRESSED OR IMPLIED,
OF MERCHANTABILITY OR OTHERWISE, OR OF FITNESS FOR ANY PARTICULAR PURPOSE, THAT EXTENDS BEYOND THE ABOVE DESCRIPTION OF THE EQUIPMENT.
NOTE: Price is good for 15 Days . Cost increases due to the addition of Government mandated safety or environmental devices incurred after the date of this proposal, will be charged to you at our cost. Proof of such costs, if any, will be documented.
TAXES: SALES TAX applicable at time of delivery will be shown on our invoice. FEDERAL EXCISE TAXES, if applicable, will require payment unless a properly executed Exemption Certificate is submitted.
DELIVERY: 180-220 Days TERMS: Cash on Delivery
Add-On/Cooperative Purchase Authorization: Haaker Equipment Company offers the above proposed price, terms and conditions to any governmental agency or subdivision in the State of California or Nevada for a period not to exceed a full calendar year from the date of original purchaser’s purchase order or contract.
We appreciate the opportunity to present this proposal and look forward to being of further and continued service.
HAAKER EQUIPMENT COMPANY ACCEPTED BY: BY: Matt Frazier DATE: MATT FRAZIER
SALES REPRESENTATIVE
777
Solid Waste Electric Truck
Pilot
778
visalia.gov
Why electrify?
The State of California and the California Air Resources Board have mandated that State and local agencies begin converting their heavyduty fleets to zero emission starting 2024. CNG does not qualify as meeting the regulations. This leaves electric as the only alternative, as hydrogen fuel cell trucks are still not available.
A pilot electric vehicle will assist staff in getting real world data on the new technology, specific to the City of Visalia over an extended period of time.
There are now enough users of electric trucks to obtain good references and information.
779
visalia.gov
Research Process and Information Gathering Overview
Staff researched and demo’ed viable solid waste trucks from various manufacturers and configurations. This included ensuring the Transit charging station was compatible, and also included the Fleet Department for servicing and maintenance questions. After selecting a preferred manufacturer for viability and experience, staff collected testimonials and researched current operators of the selected truck within, and outside, California.
After ensuring that the truck was a operationally viable alternative for a current CNG truck, staff compiled data and cost figures, including initial quotes, to determine the lifetime cost of an electric truck versus the City’s current CNG platform. 780
visalia.gov
Trucks Considered
Trucks that Staff considered and their general operating specifications:
*extra legal weight capacity capable on electric trucks due to tag axle (except Battle Motors) Mack LR Electric Peterbilt 520EV Battle Motors McNeilus Volterra CNG Comparable Electric Battery Capacity 334 kWh 400 kWh 400kWh 498 kWh N/A Battery Type Lithium-Ion Lithium-Iron Phosphate Lithium-Iron Phosphate Lithium-Ion N/A Range 100 miles 150 miles 210 miles 150 miles 150 miles GVWR (Gross Vehicle Weight Rating) 72,000 lbs 77,020 lbs 66,000 lbs 66,000 lbs 60,000 lbs Maximum Legal Weight (CA) 59,500 lbs 59,500 lbs 57,500 lbs 59,500 lbs 51,500 lbs Payload 16,500 lbs 17,060 lbs 17,340 lbs 19,280 lbs 14,400 lbs Charging (@150kW) 2 hours 3-4 hours 3 hours 4 hours N/A Capacity 28 cubic yards 28 cubic yards 28 and 31 yard options 31 cubic yards 28 cubic yards 781
visalia.gov
Staff Selection Criteria
Mack LR Electric – Battery capacity and range was not desirable. Peterbilt 520EV – Was a viable truck, but seemed to perform with less battery efficiency compared to alternative. Was able to complete route as needed. Not many on the road or sold.
Battle Motors – Not enough experience (sales in CA) outside of demo that warranted comparison.
McNeilus Volterra – Was a viable truck that seemed to check off all operational needs, with the best range and turning radius. Was able to complete route as needed.
Many operators throughout California for references.
782
visalia.gov
Staff Selection – McNeilus Volterra
Local McNeilus dealer is located in Tulare, CA.
Able to service and provide warranty work locally.
Two options available:
New truck, ordered through the Sourcewell Cooperative Demo Truck, also available through the Sourcewell Cooperative (due to mileage being less than 3,500. (Current mileage is 1,721) *Demo Truck is also still grant eligible as verified through the Air Resources Board.
783
visalia.gov
McNeilus Volterra Considerations
Knowing the cost of an electric alternative to CNG would have a higher upfront cost, staff considered what grant options were available to bridge the cost gap.
In addition, staff considered the lifetime cost of owning an electric truck versus a CNG model to determine if any cost savings are anticipated due to the difference in fuel and maintenance needs.
784
visalia.gov
Lifetime Cost Comparison: Electric vs. CNG
Electric Advantages
Lower estimated repairs
Lower estimated maintenance
Lower estimated cost of fuel (charge)
Electric Drawbacks
Higher up-front capital cost
Possible unknowns due to experience
Possible repair delays
785
visalia.gov
General Assumptions for Comparison
CNG Truck
210 working days per year
10-year life
90 miles average per day, per route
No Air Board Incentives
Electric Truck
210 working days per year
10-year life
90 miles average per day, per route
Air Board Incentives (HVIP, Truck Replacement Program) 786
visalia.gov
Assumptions for Comparison
CNG Truck
CNG fuel - $1.61/gal (current price)
CNG Fuel Use – 45 DGE per day (60% of max 75 DGE)
Repairs and Maintenance based on 10-year actual averages Electric Truck
Electricity - $0.22/kWh (off-peak)
50% battery use per day (249 kWh)
Repairs at a factor of 73.11% of CNG
Maintenance at a factor of 50% of CNG *
*based on operator 2-year actuals
787
visalia.gov
10-year Total Cost Comparison versus CNG
* Potential to stack an additional $120,832 Air Board Grant, if qualified after purchase. 10-year Electric VS CNG Comparison
CNG Electric Demo Electric New
Purchase Price $527,371.08 $848,035.38 $931,171.35
Initial Charger $0.00 $28,333.20 $28,333.20
Grant Dollars HVIP $0.00 ($150,000.00) ($150,000.00)
Total Purchase Price (including tax) $527,371.08 $726,368.58 $809,504.55 Estimated Repairs (related to Parts & Labor) $285,919.67 $209,035.87 $209,035.87 Estimated Preventative Maintenance $38,082.29 $19,041.14 $19,041.14 Estimated Fuel $152,433.44 $114,478.50 $114,478.50
Total Cost of Ownership (Annual) $1,003,806.48 $1,068,924.09 $1,152,060.06 788
visalia.gov
10-year Total Repair and Mtc Cost Comparison vs CNG
789
visalia.gov
Additional Purchase Requirements
Maintenance Requirements
PPE required for servicing electric vehicles
General safety equipment for the Fleet department related to high electric current (barricades, etc.)
Additional specialized high voltage training (included in purchase) Charging Backup Solutions/Opportunities
Initial Charger (Backup)
Future Solar Consideration
790
791
Agenda Item Wording:
..title
Presentation of solid waste electric truck pilot – Presentation of staff recommended solid waste electric truck pilot and comparative analysis. ..body
Agenda Date: 04/06/2026
Prepared by: Jason Serpa, Public Works Manager, 713-4533, [email protected]; Nick Bartsch, Public Works Director, 713-4052, [email protected] Department Recommendation: Staff recommends that the City Council receive the presentation on the Solid Waste Division’s recommendation of a pilot electric solid waste truck.
Summary:
The State of California and the California Air Resources Board have mandated that State and local agencies begin converting their heavy-duty fleets to zero-emission beginning January 1, 2024. Currently, there are effectively two options, battery-electric and hydrogen fuel cell vehicles. Unfortunately, low-emission Compressed Natural Gas (CNG) does not qualify towards meeting the mandated regulation. Due to the lack of hydrogen fuel-cell vehicles entering the market, battery-electric technology is currently the only commercially available and logistically feasible option in the market today. City staff recognize the immediate need to pilot an electric solid waste truck for a long-term benefit of testing, while also developing a possible strategy and pathway to successfully satisfy the Advanced Clean Fleets (ACF) requirements.
Background Discussion:
Historically, the City of Visalia Solid Waste Division has procured a mix of CNG and diesel fueled vehicles to replace or grow the solid waste fleet. Due to the zero-emission regulations in the State of California, the City began the process of researching alternative fuel vehicles, and subsequently, the viability and affordability of purchasing an electric solid waste truck. Staff took the approach of studying various types of electric truck products available for sale, then coming to a recommendation based on the performance and future ownership costs of the vehicle.
After reviewing products from multiple battery-electric truck manufacturers and being able to demo several trucks on the City’s routes, one manufacturer performed better than its competitors. Due to the ease of operation, purpose-built design for reduced maintenance and equipment longevity, and perhaps most importantly, battery efficiency, the McNeilus/Volterra is the preferred option, having the ability to perform the same duties as the City’s current internal combustion-powered equipment.
With any new technology or product, there is a need to do due diligence by contacting other cities and private operators that are running the specific electric truck product staff is considering. Additionally, the specific truck under consideration was tested for 2 full days onsite so that Solid Waste staff along with Fleet Maintenance personnel could weigh in on the truck’s capabilities and/or drawbacks.
792
References:
Four different current operators of the McNeilus/Volterra truck were interviewed over the phone, ranging in experience from 1-2 years of running the specific equipment. It is noted that almost all the referenced operators listed below did purchase a few trucks initially for testing and now have many more trucks in the fleet and/or ordered. These operators were:
Republic Services (Huntington Beach, CA)
Pride Disposal (Sherwood, OR)
Waste Management (Sun Valley, CA)
Republic Services (Long Beach, CA)
Even though the number of trucks varied from each fleet, ranging from 2 to 10 trucks, the operators listed above all had as much real-life experience as could be expected with the new electric trucks. They all had similar routes with an average of 1,100 – 1,250 cans, comparable to our daily loads.
The first operator staff contacted was Republic Services in Huntington Beach, CA. They have operated five (5) total trucks – (2) trucks for about a year, and (3) trucks for 10 months.
They are also scheduled to receive seven (7) more within the next 12 months. Their approach was similar in that they wanted to pilot two (2) trucks before committing to more, and they have become increasingly confident in the performance of the Volterra electric truck provided by McNeilus. Staff received positive information regarding minimum downtime and the ability of the truck to replace an internal combustion counterpart.
The second contact was Pride Disposal from Sherwood, OR. This solid waste company serves a few communities in Oregon and has two (2) Volterra trucks that they have operated for 2 years. This operator, being the most experienced in terms of time with the equipment, was able to answer more detailed questions regarding technician repairs and training, in addition to information on charging stations and the portable chargers that they deployed. This contact had very specific knowledge on the McNeilus Volterra due to his extensive time rolling out the truck and testing from the beginning of procurement. They were able to articulate many nuances of the truck, including that tires (while not different than any other internal combustion-powered (ICE) vehicle) may be the most expensive regular maintenance item, as many other preventative maintenance items (like oil changes) are no longer needed. They also mentioned that other items like brakes and fluids would have a greater maintenance interval, lowering the overall cost of preventative maintenance and breakdowns as compared to ICE trucks. It was also encouraging to note that even on their worst day (including a 2-hour breakdown), their longest route (by mileage and number of pick-ups), hilly terrain, and on a 90-degree day, the truck still came in with a 23% charge on the battery. On a normal day, the battery charge would typically end at 40% - 80%, depending on the route based on 1,100 can pickups.
Staff’s third contact, Waste Management from Sun Valley, CA, currently has nine (9) McNeilus Volterras, with eight (8) of them being side-loader operations. Their experience started in September of 2025. They stated that they have had no issues with the cab and chassis. Regarding the body, they have had typical mechanical issues pertaining to hydraulic lines and sensors, but nothing major. The longest downtime they have 793
experienced for repair was 2 weeks, and out of their 9 trucks, 7 have had no issues at all.
The advice they wanted to impart to future users was to ensure that any new truck purchased has the latest programming to avoid the sensor issues they had on a couple of trucks. They also gave us the latest software version upgrade so we can ensure that it is completed on a truck if we decide to purchase one.
Staff then contacted a fourth operator of the McNeilus product, Republic Services in Long Beach, CA. Even though their base was in Long Beach, they serve many communities, including school districts. They currently run twelve (12) McNeilus Volterra trucks and expect delivery of ten (10) more within the year. Their experience with McNeilus goes back 16 months, as they received one of the first Volterras to be sold. They stated that in the first couple of months they had extreme issues regarding software that needed upgrading, and some minor hydraulic issues. After those bugs were worked out, they have been happy with the product and have experienced nearly no downtime. They did have a battery issue with the very first truck they received, which needed to have a warranty replacement of the battery pack. Overall, they are happy with the product and state that the support response they receive from their dealer is top notch, with a technician being dispatched on the same day of issue in most instances.
Even through initially testing new electric truck technology and getting good references, staff understand that with any new technology, extended testing, specific to the City of Visalia and its solid waste operation, is most valuable before a more extensive investment of converting the entire fleet and installing charging infrastructure is made. This is why staff is proposing a pilot as the best option. The pilot would purchase one truck, put that truck into service, and observe the compatibility and comparability of operational costs.
Subsequent purchases would then be evaluated and considered upon the successful performance of the pilot truck.
Service:
This type of new vehicle technology, especially specialized equipment like an electric solid waste truck, requires specialized training on the fleet service side. The local McNeilus and Volterra dealer is located in Tulare. They will be responsible for conducting service training with the City’s Fleet Maintenance technicians, including the low and high voltage training, necessary for safety around electric vehicles. This type of training is included in the purchase of the Volterra truck, including information on all necessary tooling that will need to be purchased for the service of these trucks.
Along with the specialized training for high voltage repairs, staff will need to procure specialized personnel protective equipment and supplies. Even though the costs of these items are the same as PPE that the fleet mechanics would otherwise buy for other types of battery electric equipment, it is important to acknowledge.
The City also has the option to have the local dealer perform all required routine maintenance at the cost of $1,000 per quarter, or $4,000 annually, per vehicle. These costs will be further evaluated through the pilot to determine cost effectiveness, convenience, and efficiency.
Charging Infrastructure:
794
In regard to the presented pilot, staff plans to utilize Transit’s available charging station, as it has already been tested in its ability to charge the McNeilus Volterra. For longer term consideration, if the City continues with a plan of electrifying fleet operations, staff will incorporate additional infrastructure into the Corporation Yard master plan and research avenues for additional grant opportunities that exist, like Southern California Edison’s programs for infrastructure upgrades. For reference, a single level 2 charger station can run from $25,000 - $75,000, depending on existing site, and a level 3 fast charger can run up to $250,000 for a single fast charger station.
Staff also researched a backup charging unit. This unit could be utilized to charge the truck overnight in the same manner as the Transit charging station, or used as a backup if charging infrastructure went down. This charger was quoted at $28,333.20, tax included, and is included in the cost breakdown in the financial section below.
Fiscal Impact including annual maintenance and operating costs: Even though the initial capital investment of a battery-electric-powered truck is greater than its CNGpowered equivalent that the City is accustomed to purchasing, staff have prepared a sideby-side comparison of the expected lifetime costs of the electric-powered options compared to the City’s typical internal combustion-powered natural gas vehicle. As seen below, the initial capital to purchase the electric truck is higher, but the electric truck does make strides in payback by year ten (in accordance with the City’s current vehicle replacement schedule), achieving an anticipated near equal total cost of ownership, with maintenance and fuel being the greatest in contrast. Staff would like to note that due to State requirements, diesel trucks are no longer considered a viable option to purchase and will be unavailable in the future, so it is not considered in the comparisons below.
Staff has been presented with two purchasing options that are shown above. The manufacturer has an electric demo truck available with 1,721 miles that could be sold to the City at a discount. It was used as a demonstration vehicle for the industry to try out and is readily available for purchase. It is identical to the new electric truck that is proposed above at the higher price point.
Possible additional grant availability:
There is a very high probability that the City would also be able to apply its previously awarded Truck Replacement Program grant from the California Air Resources Board of an 10-year Electric VS CNG Comparison
CNG Electric Demo Electric New
Purchase Price $527,371.08 $848,035.38 $931,171.35
Initial Charger $0.00 $28,333.20 $28,333.20
Grant Dollars HVIP $0.00 ($150,000.00) ($150,000.00)
Total Purchase Price (including tax) $527,371.08 $726,368.58 $809,504.55 Estimated Repairs (related to Parts & Labor) $285,919.67 $209,035.87 $209,035.87 Estimated Preventative Maintenance $38,082.29 $19,041.14 $19,041.14 Estimated Fuel $152,433.44 $114,478.50 $114,478.50
Total Cost of Ownership (Annual) $1,003,806.48 $1,068,924.09 $1,152,060.06 795
additional $128,832.00. The use of this grant will be dependent on the type of funding that the larger HVIP grant (above) is funded from. The Truck Replacement Program grant amount is not reflected in any of the cost estimates above and will aid in further lowering the overall initial cost, if it materializes.
Prior Council Action: Council has approved Diesel and CNG truck purchases in the past for budgeted replacements and growth vehicles.
Alternatives: N/A
Recommended Motion (and Alternative Motions if expected):
..recommendation
No motion necessary.
Environmental Assessment Status: N/A
CEQA Review: N/A
Deadline for Action: 04/06/2026
Attachments: Solid Waste Electric Truck Pilot Presentation Strategic Goal: Indicates which City Strategic Goal(s) this item supports. Check all that apply. ☐
Economic
Vitality
☐
Organizational
Excellence
☐
Fiscal
Strength
☒
Infrastructure
& Growth
☐
Quality
of Life
796
Visalia City Council
Staff Report
Visalia City Council
707 W. Acequia
Visalia, CA 93291
File #: 25-0723 Agenda Date: 4/6/2026 Agenda #: 1.
Agenda Item Wording:
Public Hearing to consider land use changes - land use changes to the properties owned by the Tulare County Office of Education and located at 11720 and 11836 Ave 264 and 6200 South Mooney Boulevard (APNs: 122-470-003, 122-480-004, 122-480-008, and 122-480-018):
1. Adoption of Initial Study / Mitigated Negative Declaration prepare by Tulare County Office of Education consistent with the California Environmental Quality Act (Resolution No. 2026-21).
2. General Plan Amendment No. 2025-05: A request by Tulare County Office of Education (TCOE) to expand the Urban Development Boundary for 24.32 acres east of their current administrative offices located at 6200 South Mooney Boulevard and to change the land use designations on APN: 122-480-004 from Commercial Mixed Use to Public/Institutional and APNs: 122-470-003, 122-480-008 and -018 from Agriculture to Public/Institutional (Resolution No. 2026-19).
3. Introduction and First Reading of Ordinance No. 2026-01 for Prezone and Change of Zone No. 2025-06: A request by TCOE to change the zoning designation on APN: 122-480-004 from C-MU (Mixed-Use Commercial) to QP (Quasi-Public) and to prezone APNs: 122-470-003, 122 -480-008 and -018 to QP (Quasi-Public) (Ordinance No. 2026-01, required).
4. Initiation of Proceedings for Annexation No. 2025-03: A request by TCOE to initiate annexation of APNs: 122-470-003, 122-480-008, and 122-480-018 into the city limits of Visalia (Resolution No. 2026-20).
Agenda Date: 04/06/2026
Prepared by:
Josh Dan, Senior Planner, (559)713-4003, [email protected] Paul Bernal, Planning and Community Preservation Director, (559) 713-4025, [email protected]
Department Recommendation:
The Planning Commission recommends that the City Council take the following actions, consistent with the staff recommendation made to Planning Commission on March 23, 2026:
A. Adoption of Initial Study / Mitigated Negative Declaration prepared by TCOE consistent with the California Environmental Quality Act (Resolution No. 2026-21).
B. Adopt Resolution No. 2026-19, approving General Plan Amendment No. 2025-05 which does the following:
i. Expand the Urban Development Growth Boundary (UDB) to include the 24.32-acre parcel (APN: 122-470-003) east of the current TCOE facility at 6200 South Mooney Boulevard; and
ii. Establish a land use designation for the 24.32-acre parcel (APN: 122-470-003) which is Visalia City Council Page 1 of 8 Printed on 4/2/2026
powered by Legistar™797
File #: 25-0723 Agenda Date: 4/6/2026 Agenda #: 1.
ii. Establish a land use designation for the 24.32-acre parcel (APN: 122-470-003) which is located outside the City’s UDB from Agriculture to Public/Institutional and re-designate their current campus at 6200 South Mooney Boulevard (APN: 122-480-004 from Commercial Mixed Use to Public/Institutional.
C. Introduce the first reading of Ordinance No. 2026-01 for approval of Prezone and Change of Zone No. 2025-06, which does the following:
i. The proposal seeks to prezone unincorporated territory to confirm the zone designation of QP which is consistent with the land use designations of Public/Institutional for APNs:
122-470-003, 122-480-008, and 122-480-018 that will apply to that territory upon annexation to the city; and
ii. Change of Zone will change the existing zoning for the TCOE site (APN: 122-480-004) from C-MU (Commercial Mixed Use) to QP (Quasi-Public), which is also consistent with the General Plan Amendment No. 2025-05.
D. Adopt Resolution No. 2026-20, initiating proceedings for Annexation No. 2025-03 which will complete the following:
i. Initiation of Proceedings for Annexation No. 2025-03 a request by TCOE to annex a total of 37.5-acres parcel into the City Limits of Visalia; and ii. Authorize the detachment from County Service Area No. 1 in accordance with State and County requirements; and
iii. Authorize the City Manager to sign and enter into a Pre-Annexation Agreement (Resolution No. 2026-20 required).
It is standard practice for staff to recommend the upholding of a Planning Commission action.
Furthermore, if approved by the City Council, staff will file the Annexation application with LAFCO.
The recommendation to land use and zoning designations will facilitate the Tulare County Office of Education proposed campus expansion with additional facilities to its existing administrative office and conference center located at 6200 South Mooney Boulevard. TCOE has acquired portions of adjacent properties which will be merged with the existing site, expanding their overall campus site by approximately 12.54 acres.
Summary:
This proposal aids in consolidation and centralization of existing TCOE offices, which are located at 7000 West Doe Avenue and other sites, while hosting professional development training courses and workshops for district employees. If all entitlements are approved, the contiguous sites will be developed in a manner to provide internal access via drive aisles, along with other onsite improvements including curbing, drainage, and utility infrastructure, see Exhibit “A”. In addition, the expansion will also have an additional vehicular access point from Avenue 264 / Liberty Avenue (see Site Plan in Exhibit “A”).
The existing TCOE facility located at 6200 South Mooney Boulevard, was completed in 2016. The existing 11-acre campus includes administration offices and a conference center. The existing building is 91,596 square feet consisting of a three-story professional office building and a singlestory conference center. The site design included three landscaped ponding areas for stormwater retention and a greenbelt along the northern property line. On the east side of the property, 2.5 acres were reserved for future expansion. Parking provided onsite totals 379 stalls used by employees and visitors. The only existing vehicular ingress and egress onto the site is provided via South Mooney Visalia City Council Page 2 of 8 Printed on 4/2/2026
powered by Legistar™798
File #: 25-0723 Agenda Date: 4/6/2026 Agenda #: 1.
visitors. The only existing vehicular ingress and egress onto the site is provided via South Mooney Boulevard. In addition to administrative offices and support to TCOE schools and facilities, the existing campus is also used to host conferences, educational training, and up to three large-scale conferences per year.
The proposed campus expansion is expected to provide five (5) additional buildings providing space for offices, classrooms, and conference meeting space. Each building, square footage, and proposed use are listed in Table 1-1 below and are depicted in Exhibit “A”.
Table 1: Existing and Proposed TCOE Buildings
BLDG No. Square Feet Stories Purpose / Use
100 (existing) 91,569 3 Existing admin and conf. center 200 (proposed) 50,985 1 Offices
300 (proposed) 50,985 1 Offices
400 (proposed) 6,227 1 Three classrooms and training kitchen 500 (proposed) 6,227 1 Conference / Board Room
600 (proposed) 35,264 1 Warehouse
To assist in the overall development of the TCOE campus expansion, TCOE will be purchasing two adjacent sites to provide land area for these onsite improvements. A proposed stormwater ponding basin will be constructed along the southern boundary of the property for on-site drainage. New parking facilities surrounding the development will provide an additional 388 parking stalls, including 17 accessible spaces. Between the existing and proposed parking stalls, 767 stalls will be provided onsite.
To facilitate this request, in addition to the entitlements listed above (i.e., General Plan Amendment, Prezone and Change of Zone, and Annexation) the following Conditional Use Permit (CUP) entitlement was also required. CUP No. 2025-28, approved by the Planning Commission on March 23, 2026, was required due to schools being listed as a conditionally permitted use in the QuasiPublic zone. Staff supports TCOE’s campus expansion as the project complies with General Plan land use policies as stated in the General Plan analysis section below.
Of the entitlements required, only Conditional Use Permit No. 2025-28 was in the Planning Commission’s purview. The use permit was a requirement for the proposed classrooms on site to accompany the office spaces, storage building, and board / conference room.
The applicant has detailed in the operational statement and verbally that the use of the site is intended for the consolidation of their existing facilities to this one location. The facility is intended for use by TCOE employees and teachers; however, the TCOE board / conference room is subject to the Civic Center Act which requires that their facilities be made available to the public via the TCOE Board approved fees schedule. The applicant has further identified that TCOE meetings and events will have priority whereas others will have to schedule around TCOE’s established meeting and event dates.
Planning Commission Public Hearing:
The Planning Commission conducted a hearing on March 23, 2026, to consider the general plan amendment, prezone and change of zone, annexation, and conditional use permit for the TCOE project. The only public comment received was from Jeff Ramsey, Director of General Services with TCOE. The Planning Commission was unanimous in their approval of the conditional use permit Visalia City Council Page 3 of 8 Printed on 4/2/2026
powered by Legistar™799
File #: 25-0723 Agenda Date: 4/6/2026 Agenda #: 1.
TCOE. The Planning Commission was unanimous in their approval of the conditional use permit based on the findings in the staff report and resolution, and unanimous in their recommendation of approval to the City Council for the general plan amendment, prezone and change of zone, and annexation.
General Plan Land Use and Zoning Compatibility:
The General Plan describes that the Public/Institutional land use classification applies to lands owned by public entities, including City Hall and other City buildings, County buildings, schools, the Municipal Airport, and hospitals. Specifically, Land Use Policy LU-P-108 supports the designation of land for Public/Institutional uses including city, county, and other government buildings as well as schools. Additionally, the General Plan’s Parks, Schools, Community Facilities, and Utilities Element details in several policies the promotion of educational alternatives, like charter schools, per the following policies:
PSCU-P-34: Coordinate land use and development with school location and site design, working with the Visalia Unified School District and other districts to ensure that adequate facilities are available and integrated with neighborhoods.
PSCU-P-39: Promote the location and development of vocational and trade schools and alternative and continuing education programs such as Visalia Charter Independent Study.
PSCU-P-44: Support efforts to involve youth in leadership and job training programs.
Permitting the expansion of the TCOE campus meets General Plan Objective LU-O-13 by minimizing urban sprawl and leap-frog development by supporting the expansion of the TCOE campus which is within the Visalia planning area, thereby promoting orderly growth instead of fragmented development. In addition, supporting the expansion of the TCOE campus will help preserve educational diversity in Visalia’s economic base which may help increase the stability of jobs and support economic competitiveness by aligning education with local needs. Expansion of the existing facility for the proposed uses would be in keeping with the City of Visalia’s goals and polices of supporting educational growth opportunities while coordinating with school districts to offer alternative education facilities, which in turn, deliver long-term community benefits by expanding critical publicserving educational institutions.
Parking:
The proposed expansion entails uses for office, board/conference rooms, classrooms, and storage/warehousing. Pursuant to the Visalia Municipal Code Chapter 17.34, off street parking and loading facilities, the following parking criteria is applied for the uses:
1. Offices - Section 17.34.020.F.4: Offices, including all public and professional offices, except as otherwise specified: one parking space for each two hundred fifty (250) square feet of building area, with a minimum of four parking spaces.
2. Classrooms - Section 17.34.020.C.3: High schools, one parking space for each employee plus seven parking spaces for each classroom.
3. Warehousing - Section 17.34.020.F.17: Storage and warehouses: one parking space for each one thousand (1,000) square feet of building area.
Visalia City Council Page 4 of 8 Printed on 4/2/2026
powered by Legistar™800
File #: 25-0723 Agenda Date: 4/6/2026 Agenda #: 1.
Staff has provided Table 1-2 (below) to provide analysis of the parking requirements for each building:
Table 1-2: Parking
BLDG No. Floor area VMC Ratio Required
200 50,985 1:250 sq. ft. (Offices) 204
300 50,985 1:250 sq. ft. (Offices) 204
400 6,227 1 per employee & 7 per Classroom (3
classrooms)
24 500 6,227 1 per 4 seats (100 seats)25
600 35,264 1:1,000 sq. ft. (warehouses) 35
Considering the parking ratios and floor areas provided, 492 parking stalls would be required for the additional buildings based on the parking ratios as prescribed in the Zoning Ordinance. The existing facility’s 379 parking stalls, in addition to the 388 stalls proposed, provides a total of 767 stalls across the entire TCOE campus.
Staff would note that the existing TCOE building was not developed through the City’s permitting process and therefore parking ratios for the site were established based on their needs and not the city’s parking ratios. However, the total number of parking stalls provided is justified due to the operational characteristics of the TCOE campus. Specifically, not all buildings are intended to be occupied simultaneously or at full capacity throughout the day. The campus will function with staggard schedules, varying program hours, and intermittent use of certain facilities. Based on the operational needs for the TCOE site, staff concludes the parking provided adequately serves the project site without resulting in adverse “spillover” parking impacts to the surrounding area.
Access, Connectivity, and Circulation:
Mooney Boulevard (State Route 63) is state highway that has full improvements across the existing facility’s frontage. The secondary vehicular access point at Avenue 264 is needed to facilitate adequate fire access and to provide a secondary point of ingress/egress for the TCOE campus. The Engineering Division has identified that full improvements to Avenue 264 will not be warranted at this time; however, should additional development be considered for the undeveloped portion of the site, additional street improvements will be required. The extent of these improvements would include sidewalks, curb, gutter, park strip landscaping, city streetlights, etc., to City standards. It should be noted that there is also a gated access point set off the roadway (Avenue 264), which serves as the secondary point of access to the site.
The existing facility and proposed expansion will be connected via interior drive aisles which are expected to integrate into the overall layout. Some demolition of existing improvements like solar canopies and stormwater gutters will need to occur and be reconfigured, however, there is no concern from staff regarding the cohesion of the two phases.
Landscaping, Lighting, and Fencing:
The existing facility is fully landscaped along its Mooney Boulevard frontage and has a “greenbelt” of landscaping around its perimeter. The proposed expansion will mirror a similar landscaping design.
Furthermore, the existing Mooney Boulevard frontage has black wrought iron fencing and access gates, whereas the remainder of the perimeter is predominantly fenced with chain-link fencing. Visalia City Council Page 5 of 8 Printed on 4/2/2026 powered by Legistar™801
File #: 25-0723 Agenda Date: 4/6/2026 Agenda #: 1.
gates, whereas the remainder of the perimeter is predominantly fenced with chain-link fencing.
Exhibit “A” shows that similar styled gates and fencing are expected around the perimeter expansion and secondary access point. The proposed seven-foot-tall decorative metal fence is consistent with the fence height and placement requirements established in municipal code Chapter 17.36 Fences, Walls and Hedges for similar uses.
Environmental Review:
The proposed project was previously evaluated pursuant to the California Environmental Quality Act (CEQA) by TCOE which acted as the Lead Agency for the project. TCOE prepared an Initial Study and Mitigated Negative Declaration (MND) for the project and, following a 30-day circulation of the document for public review, TCOE adopted the Mitigated Negative Declaration and approved moving forward with the project finding that, with implementation of identified mitigation measures, the project would not result in significant environmental impacts.
The City, acting as a Responsible Agency for purposes of CEQA, is required to consider the environmental effects of the project as shown in the environmental document prepared by TCOE before acting on the project. The City is required to impose feasible mitigation measures within its jurisdiction.
TCOE consulted with City staff on the preparation of the Initial Study and MND. The City has independently reviewed and considered the Initial Study and MND, together with the administrative record associated with the Lead Agency’s approval of the project, and finds that the environmental document adequately evaluates the environmental impacts of the project.
Table 3-19 of the IS/MND produced by TCOE identifies the Mitigation Monitoring and Reporting Program for the project. The table recognizes measures intended for:
· One (1) Agricultural Resources related to impacts to Prime Farmland. · Three (3) Biological Resources related to protecting nesting Swainsons hawks, roosting pallid bat and western mastiff bat, obtaining a permit from the SWRCB for impacts to jurisdictional waters, protecting nesting birds;
· Two (2) Cultural Resources related to whether any accidental discovery of unidentified archaeological remains or human remains during development or ground-moving activities in the project boundary.
Fiscal Impact including annual maintenance and operating costs: None.
Prior Council Action: None.
Other:
The Planning Commission held a public hearing on March 23, 2026, to consider the general plan amendment, prezone and change of zone, annexation, and conditional use permit for the TCOE project site. The Planning Commission approved the conditional use permit, based on the findings in the staff report, and recommended approval to the City Council the general plan amendment, prezone and change of zone, and annexation request. The vote for all four entitlements was 4-0 with Vice Chair Davis recused.
Alternatives:
The City Council may, in lieu of the recommended motion specified above, consider any of the Visalia City Council Page 6 of 8 Printed on 4/2/2026
powered by Legistar™802
File #: 25-0723 Agenda Date: 4/6/2026 Agenda #: 1.
The City Council may, in lieu of the recommended motion specified above, consider any of the following alternatives:
1. Deny the General Plan Amendment, Prezone and Change of Zone, and Annexation; or
2. Refer the matter back to Planning Commission; or,
3. Continue the matter to a future City Council hearing.
Recommended Motion (and Alternative Motions if expected):
1. I move to approve Resolution No. 2026-21, adopting Initial Study / Mitigated Negative Declaration.
2. I move to approve Resolution No. 2026-19, approving General Plan Amendment No. 2025-05.
3. I move to introduce for the first reading of Ordinance No. 2026-01, approving Prezone and Change of Zone No. 2025-06.
4. I move to approve Resolution No. 2026-20, to initiate proceedings for Annexation No. 2025-03, authorizing the detachment of property from County Service Area No. 1, and authorize the City Manager to enter into a Pre-Annexation Agreement between the City of Visalia and the property owners.
Environmental Assessment Status:
TCOE prepared an Initial Study and Mitigated Negative Declaration (MND) for the project and, following circulation of the document for public review, TCOE Board adopted the Mitigated Negative Declaration and approved moving forward with the project finding that, with implementation of identified mitigation measures, the project would not result in significant environmental impacts.
TCOE consulted with City staff on the preparation of the Initial Study and MND. The City has independently reviewed and considered the Initial Study and MND, together with the administrative record associated with the Lead Agency’s approval of the project and finds that the environmental document adequately evaluates the environmental impacts of the project. Therefore, staff recommends the Mitigated Negative Declaration be adopted for this project.
CEQA Review:
The proposed project was previously evaluated pursuant to the California Environmental Quality Act (CEQA) by TCOE which acted as the Lead Agency for the project. TCOE prepared an Initial Study and Mitigated Negative Declaration (MND) for the project and, following a 30-day circulation of the document for public review, TCOE adopted the Mitigated Negative Declaration and approved moving forward with the project finding that, with implementation of identified mitigation measures, the project would not result in significant environmental impacts.
The City, acting as a Responsible Agency for purposes of CEQA, is required to consider the environmental effects of the project as shown in the environmental document prepared by TCOE before acting on the project. The City is required to impose feasible mitigation measures within its jurisdiction.
TCOE consulted with City staff on the preparation of the Initial Study and MND. The City has independently reviewed and considered the Initial Study and MND, together with the administrative record associated with the Lead Agency’s approval of the project, and finds that the environmental document adequately evaluates the environmental impacts of the project.
Table 3-19 of the IS/MND produced by TCOE identifies the Mitigation Monitoring and Reporting Visalia City Council Page 7 of 8 Printed on 4/2/2026
powered by Legistar™803
File #: 25-0723 Agenda Date: 4/6/2026 Agenda #: 1.
Table 3-19 of the IS/MND produced by TCOE identifies the Mitigation Monitoring and Reporting Program for the project. The table recognizes measures intended for:
· One (1) Agricultural Resources related to impacts to Prime Farmland. · Three (3) Biological Resources related to protecting nesting Swainsons hawks, roosting pallid bat and western mastiff bat, obtaining a permit from the SWRCB for impacts to jurisdictional waters, protecting nesting birds;
Two (2) Cultural Resources related to whether any accidental discovery of unidentified archaeological remains or human remains during development or ground-moving activities in the project boundary.
Deadline for Action: 04/06/2026
Attachments:
1. City Council Resolution No. 2026-21 - Initial Study / Mitigated Declaration
2. City Council Resolution No. 2026-19 - General Plan Amendment No. 2025-05
3. City Council Ordinance No. 2026-01 - Prezone and Change of Zone No. 2025-06
4. City Council Resolution No. 2026-20 - Annexation No. 2025-03
5. Planning Commission Staff Report - March 23, 2026
6. Exhibit “A” - Site Plan(s)
7. City Council PowerPoint Presentation
Strategic Goal: Indicates which City Strategic Goal(s) this item supports. Check all that apply. ☒
Economic
Vitality
☐
Organizational
Excellence
☐
Fiscal
Strength
☒
Infrastructure &
Growth
☒
Quality of
Life
Visalia City Council Page 8 of 8 Printed on 4/2/2026
powered by Legistar™804
Resolution No. 2026-21
RESOLUTION NO. 2026-21
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF VISALIA,
ADOPTING TULARE COUNTY OFFICE OF EDUCAITON MITIGATED
NEGATIVE DECLARATION, WHICH EVALUATES ENVIRONMENTAL
IMPACTS FOR GENERAL PLAN AMENDMENT NO. 2025-05, PREZONE AND CHANGE OF ZONE NO. 2025-06, AND ANNEXATION NO. 2025-03 WHEREAS, the project consisting of General Plan Amendment No. 2025-05, Prezone and Change of Zone No. 2025-06, and Annexation No. 2025-03 (hereinafter “Project”) is a request to amend Urban Development Boundary (UDB) to include APN: 122-470-003; the General Plan land use designation of APN: 122-470-003 from Agriculture to Public/Institutional and APN: 122-480-004 from Commercial Mixed Use to Public/Institutional 9.42 acres; and to Prezone and Change of Zone on APN: 122-480-004 from C-MU (Mixed-Use Commercial) to QP (Quasi-Public) and to prezone APNs: 122-470-003, 122-480-008 and -018 to QP (Quasi-Public). The site is located at 11720 and 11836 Ave 264 and 6200 South Mooney Boulevard (APNs: 122-470-003, 122-480-004, 122-480- 008, and 122-480-018); and,
WHEREAS, the City Council of the City of Visalia, following a period of ten (10) days after published notice, held a public hearing before said Council on April 6, 2026; and, WHEREAS, an Initial Study was prepared by Tulare County Office of Education which disclosed that no significant environmental impacts would result from the Project, subject to mitigation; and,
WHEREAS, on the basis of this Initial Study, a Mitigated Negative Declaration has been prepared for the Project pursuant to the California Environmental Quality Act of 1970 (CEQA); and, WHEREAS, the Initial Study and Mitigated Negative Declaration for the Project were prepared and noticed for review and comment for 45 days beginning on January 16, 2026, and ending on March 2, 2026; and,
WHEREAS, the Tulare County Office of Education received no comments on the Initial Study and Mitigated Negative Declaration; and,
WHEREAS, the City Council considers that the proposed project has no new effects that could occur, or new mitigation measures that would be required that have not been addressed within the scope of the Tulare County Office of Education produced Initial Study / Mitigated Negative Declaration for the Project, certified by the Visalia City Council on April 6, 2026, by Resolution No. 2026-21. The Initial Study / Mitigated Negative Declaration adequately analyzed and addressed this proposed project and determined, with mitigation, that there would not be significant impacts resulting from the development of the Tulare County Office of Education Project.
A Mitigation and Monitoring Plan adopted with the Initial Study / Mitigated Negative Declaration 805
Resolution No. 2026-21
includes mitigation measures that reduce or eliminate the severity of some of these impacts to a level that is less than significant.
NOW, THEREFORE, BE IT RESOLVED that the Tulare County Office of Education prepared Initial Study and Mitigated Negative Declaration was prepared consistently with the California Environmental Quality Act and the City of Visalia Environmental Guidelines.
BE IT FURTHER RESOLVED that the City Council of the City of Visalia hereby finds, on the basis of the whole record before it, that there is no substantial evidence that the project will have a significant effect on the environment and hereby adopts the Tulare County Office of Education prepared Initial Study and Mitigated Negative Declaration. The documents and other material which constitute the record of the proceedings upon which the decisions based are located at the office of the City Planner, 315 East Acequia Avenue, Visalia, California, 93291.
PASSED AND ADOPTED: April 6, 2026 LESLIE B. CAVIGLIA, CITY CLERK
STATE OF CALIFORNIA )
COUNTY OF TULARE ) ss.
CITY OF VISALIA )
I, Leslie B. Caviglia, City Clerk of the City of Visalia, certify the foregoing is the full and true Resolution 2026-21 passed and adopted by the Council of the City of Visalia at a regular meeting held on April 6, 2026.
Dated:April 06, 2026 LESLIE B. CAVIGLIA, CITY CLERK
By Reyna Rivera, Chief Deputy City Clerk
806
Resolution No. 2026-19
RESOLUTION NO. 2026-19
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF VISALIA, APPROVING GENERAL PLAN AMENDMENT NO. 2025-05: A REQUEST BY TULARE
COUNTY OFFICE OF EDUCAITONTO EXPAND THE URBAN DEVELOPMENT BOUNDARY FOR 24.32 ACRES EAST OF THEIR CURRENT ADMINISTRATIVE OFFICES LOCATED AT 6200 SOUTH MOONEY BOULEVARD AND TO CHANGE THE LAND USE DESIGNATION OF APN: 122-480-004 FROM COMMERCIAL MIXED USE TO PUBLIC/INSTITUTIONAL AND APNS: 122-470-003, 122-480-008, 122-480-018 FROM AGRICULTURAL TO PUBLIC/INSTITUTIONAL. THE SITE IS LOCATED AT 6200 SOUTH MOONEY BOULEVARD AND 11720 AND 11836 AVE 264
(APNS: 122-470-003, 122-480-004, 122-480-008, and 122-480-018).
WHEREAS, General Plan Amendment No. 2025-05 is a request by Tulare County Office of Education to expand the Urban Development Boundary for 24.32 acres east of their current administrative offices located at 6200 South Mooney Boulevard and to change the land use designations on APN: 122-480-004 from Commercial Mixed Use to Public/Institutional and APNs: 122-470-003, 122-480-008 and 122-480-018 from Agriculture to Public/Institutional.
The site is located at 6200 South Mooney Boulevard and 11720 and 11836 Ave 264 (APNs:
122-470-003, 122-480-004, 122-480-008, and 122-480-018); and, WHEREAS, the Planning Commission of the City of Visalia, after duly published notice, held a public hearing before said Commission on March 23, 2026; and, WHEREAS, the Planning Commission of the City of Visalia considered the General Plan Amendment in accordance with Section 17.54.060 of the Zoning Ordinance of the City of Visalia based on evidence contained in the staff report and testimony presented at the public hearing, and recommended approval of said General Plan Amendment; and, WHEREAS, the Planning Commission of the City of Visalia recommends approval of General Plan Amendment No. 2025-05; and,
WHEREAS, the City Council of the City of Visalia, following a period of ten (10) days after published notice, held a public hearing for General Plan Amendment No. 2025-05 on April 6, 2026.
WHEREAS, the proposed project was previously evaluated pursuant to the California Environmental Quality Act (CEQA) by the Tulare County Office of Education which acted as the Lead Agency for the project. Tulare County Office of Education prepared an Initial Study and Mitigated Negative Declaration (MND) for the project and, following a 30-day circulation of the document for public review, the Lead Agency adopted the Mitigated Negative Declaration and approved moving forward with the project finding that, with implementation of identified mitigation measures, the project would not result in significant environmental impacts; and 807
Resolution No. 2026-19
WHEREAS, the City, acting as a Responsible Agency for purposes of CEQA, is required to consider the environmental effects of the project as shown in the environmental document prepared by the Tulare County Office of Education before acting on the project and the City is required to impose feasible mitigation measures within its jurisdiction; and WHEREAS, the Initial Study prepared for the project disclosed that no significant environmental impacts would result from this project subject to the mitigation measures identified in the Mitigation Monitoring and Reporting Program for the project. The table recognizes measures intended for, Agricultural Resources related to impacts to Prime Farmland, Biological Resources related to protecting nesting Swainsons hawks, roosting pallid bat and western mastiff bat, obtaining a permit from the SWRCB for impacts to jurisdictional waters, protecting nesting birds, and Cultural Resources related to whether any accidental discovery of unidentified archaeological remains or human remains during development or ground-moving activities in the project boundary.
NOW, THEREFORE, BE IT RESOLVED that the City Council adopt the Tulare County Office of Education’s Mitigated Negative Declaration for General Plan Amendment No. 2025- 05 that was prepared consistent with the California Environmental Quality Act BE IT FURTHER RESOLVED that the City Council of the City of Visalia approves General Plan Amendment No. 2025-05, based on the following specific findings and evidence presented:
1. That the proposed General Plan Amendment is consistent with the goals, objectives, and policies of the General Plan, and is not detrimental to the public health, safety, or welfare, or materially injurious to properties or improvements in the vicinity.
2. That the proposed General Plan Amendment from 23.32 acres of Agricultural to Public Institutional will not impose new land uses or development that will adversely affect the subject site or adjacent properties.
3. That the proposed land use designation under the proposed General Plan Amendment results in a land use that will suitably buffer and provide an efficient transition between the existing commercial, agricultural, and residential uses surrounding the site.
4. That TCOE prepared an Initial Study and Mitigated Negative Declaration (MND) for the project and, following a 30-day circulation of the document for public review, TCOE adopted the Mitigated Negative Declaration and approved moving forward with the project finding that, with implementation of identified mitigation measures, the project would not result in significant environmental impacts. TCOE consulted with City staff on the preparation of the Initial Study and MND. The City has independently reviewed and considered the Initial Study and MND, together with the administrative record associated with the Lead Agency’s approval of the project and finds that the environmental document adequately evaluates the environmental impacts of the project. Therefore, staff recommends the Mitigated Negative Declaration be adopted for this project. 808
Resolution No. 2026-19
BE IT FURTHER RESOLVED that the City Council of the City of Visalia approves General Plan Amendment No. 2025-02, as shown on Attachment “A” of this Resolution, on the real property described herein, in accordance with the terms of this resolution and under the provisions of Section 17.54.080 of the Ordinance Code of the City of Visalia.
PASSED AND ADOPTED: April 6, 2026 LESLIE B. CAVIGLIA, CITY CLERK
STATE OF CALIFORNIA )
COUNTY OF TULARE ) ss.
CITY OF VISALIA )
I, Leslie B. Caviglia, City Clerk of the City of Visalia, certify the foregoing is the full and true Resolution 2026-19 passed and adopted by the Council of the City of Visalia at a regular meeting held on April 6, 2026.
Dated: April 06, 2026 LESLIE B. CAVIGLIA, CITY CLERK
By Reyna Rivera, Chief Deputy City Clerk
809
Resolution No. 2026-19
ATTACHMENT “A”
GENERAL PLAN AMENDMENT NO. 2025-05
Visalia City Council
Resolution No. 2026-19
810
ORDINANCE NO. 2026-01
ORDINANCE NO. 2026-01
AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF VISALIA APPROVING A PREZONING AND CHANGE OF ZONE ORDINANCE NO. 2025-06: A REQUEST BY
TULARE COUNTY OFFICE OF EDUCATION TO CHANGE THE ZONING
DESIGNATION ON APN: 122-480-004 FROM C-MU (MIXED-USE COMMERCIAL) TO QP (QUASI-PUBLIC) AND TO PREZONE APNs: 122-470-003, 122-480-008 and 122- 480-018 to QP (QUASI-PUBLIC). THE SITE IS LOCATED AT 6200 SOUTH MOONEY BOULEVARD AND 11720 AND 11836 AVE 264
(APNS: 122-470-003, 122-480-004, 122-480-008, AND 122-480-018).
WHEREAS, Prezone and Change of Zone No. 2025-06 is a request by Tulare County Office of Education to change the zoning designation on APN: 122-480-004 from C-MU (Mixed-Use Commercial) to QP (Quasi-Public) and to prezone APNs: 122-470-003, 122-480-008 and -018 to QP (Quasi-Public). The site is located at 11720 and 11836 Ave 264 and 6200 South Mooney Boulevard (APNs: 122-470-003, 122-480-004, 122-480-008, and 122-480-018); and
WHEREAS, Tulare County Office of Education has submitted entitlement applications with the City of Visalia for General Plan Amendment No. 2025-05 and Annexation No. 20225-03, to facilitate expansion of the existing Tulare County Office of Education facilities at 6200 South Mooney Boulevard by expanding the Urban Development Boundary and annexation of APNs: 122-470-003, 122-480-008, and 122- 480-018 for a total acreage of 37.5-acres of unincorporated territory to be prezoned QP (Quasi-Public) to that territory upon annexation to the city. The Change of Zone will change the existing zoning for the Tulare County Office of Education (APN: 122-480-004) site from C-MU (Commercial Mixed Use) to QP (Quasi-Public), which is also consistent with the General Plan Amendment No. 2025-05; and
WHEREAS, the proposed Q-P (Quasi-Public) zone district is consistent with Public Institutional land use designations of the General Plan, respectively, in accordance with Table 9-1: Consistency Between the Plan and Zoning; and WHEREAS, Government Code (CGC) § 56375(a)(7) requires, as a condition to annexation, that a city prezone of the territory to be annexed or present evidence satisfactory to the Local Agency Formation Commission (LAFCO) that the existing development entitlements on the territory are consistent with the city's general plan; and WHEREAS, pursuant to the City's Municipal Code and State Planning and Zoning Law, the Planning Commission of the City of Visalia is authorized to review and make recommendations to the City Council of the City of Visalia for actions related to the establishment of land use and zone designations on behalf of the City, which include General Plan Amendments and Change of Zones and extends to prezone actions; and 811
ORDINANCE NO. 2026-01
WHEREAS, the Planning Commission of the City of Visalia, after duly published notice, held a public hearing before said Commission on March 23, 2026, and considered the Prezone and Change of Zone No. 2025-06 to be in accordance with Chapter 17.02, Chapter 17.06, and Chapter 17.44 of the Zoning Ordinance of the City of Visalia and on the evidence contained in the staff report and testimony presented at the public hearing, and recommended that the City Council approve an Ordinance for the Prezone and Change of Zone No. 2025-06; and
WHEREAS, the Planning Commission of the City of Visalia recommended approval of the Prezoning for the Project; and,
WHEREAS, the City Council of the City of Visalia, after ten (10) days published notice, held a 1st reading and public hearing for the Prezone of the Annexation on April 6, 2026; and,
WHEREAS, the City Council of the City of Visalia finds the Prezone and Change of Zone No. 2025-06 to be in accordance with Chapter 17.02, Chapter 17.06, and Chapter
17.44 of the Zoning Ordinance of the City of Visalia and on the evidence contained in the staff report and testimony presented at the public hearing; and, WHEREAS, the proposed project was previously evaluated pursuant to the California Environmental Quality Act (CEQA) by the Tulare County Office of Education which acted as the Lead Agency for the project. Tulare County Office of Education prepared an Initial Study and Mitigated Negative Declaration (MND) for the project and, following a 30-day circulation of the document for public review, the Lead Agency adopted the Mitigated Negative Declaration and approved moving forward with the project finding that, with implementation of identified mitigation measures, the project would not result in significant environmental impacts; and
WHEREAS, the City, acting as a Responsible Agency for purposes of CEQA, is required to consider the environmental effects of the project as shown in the environmental document prepared by the Tulare County Office of Education before acting on the project and the City is required to impose feasible mitigation measures within its jurisdiction; and WHEREAS, the City Council considers that the proposed project has no new effects that could occur, or new mitigation measures that would be required that have not been addressed within the scope of the Tulare County Office of Education produced Initial Study / Mitigated Negative Declaration (IS/MND) for the Project, certified by the Visalia City Council on April 6, 2026, by Resolution No. 2026-21. The IS/MND adequately analyzed and addressed this proposed project and determined with mitigation that there would not be significant impacts resulting from the development of the Tulare County Office of Education Project. A Mitigation and Monitoring Plan adopted with the IS/MND includes mitigation measures that reduce or eliminate the severity of some of these impacts to a level that is less than significant.
812
ORDINANCE NO. 2026-01
NOW, THEREFORE, BE IT RESOLVED, that the City Council of the City of Visalia finds that IS/MND for the Tulare County Office of Education Project, was prepared consistent with the California Environmental Quality Act and City of Visalia Environmental Guidelines.
BE IT FURTHER RESOLVED that the City Council of the City of Visalia approves an Ordinance to Prezone and Change of Zone No. 2025-06, pursuant to Visalia Municipal Code Section 17.44.090 based on the following specific findings and evidence presented:
1. That the proposed Prezone and Change of Zone is consistent with the intent of the General Plan and Zoning Ordinance, and is not detrimental to the public health, safety, or welfare, or materially injurious to properties or improvements in the vicinity.
2. That the proposed Change of Zone from C-MU (Mixed-Use Commercial) to QP (Quasi-Public) will not impose new land uses or development that will adversely affect the subject site or adjacent properties.
3. That the proposed zoning designations under the proposed Change of Zone results in zoning and land uses that suitably buffer and provide an efficient transition between the existing commercial, agricultural, and residential zoning and uses surrounding the site.
4. The site is physically suitable (including ability to meet requested zoning regulations, access, provision of utilities, compatibility with adjoining land uses, and absence of physical constraints) for the requested zoning designations and anticipated land uses.
5. That the proposed prezoning, is being processed in accordance with Chapter 17.44 of the Visalia Municipal Code, is being done to achieve the objectives of the Zoning Ordinance prescribed in Section 17.02.020, which are established as a means to preserve and promote the public health, safety and welfare of the city, and of the public generally and to facilitate growth and expansion of the municipality in a precise and orderly manner, and is being done to confirm the classification of the zone designation that is consistent with the Visalia General Plan, in accordance with Section 17.06.050 of the Zoning Ordinance.
813
ORDINANCE NO. 2026-01
6. That Tulare County Office of Education prepared an Initial Study and Mitigated Negative Declaration (MND) for the project and, following circulation of the document for public review, Tulare County Office of Education adopted the Mitigated Negative Declaration and approved moving forward with the project finding that, with implementation of identified mitigation measures, the project would not result in significant environmental impacts. Tulare County Office of Education consulted with City staff on the preparation of the Initial Study and MND. The City has independently reviewed and considered the Initial Study and MND, together with the administrative record associated with the Lead Agency’s approval of the project, and finds that the environmental document adequately evaluates the environmental impacts of the project. Therefore, staff recommends the Mitigated Negative Declaration be adopted for this project.
BE IT FURTHER RESOLVED that the City Council of the City of Visalia approves the 1st Reading of an Ordinance of the Prezone and Change of Zone No. 2025-06, as depicted per Exhibit “A”, on the real property described herein, in accordance with the terms of this resolution and under the provisions of Chapter 17.02, Chapter 17.06, and Chapter 17.44 of the Ordinance Code of the City of Visalia.
PASSED AND ADOPTED: BRETT TAYLOR, MAYOR
ATTEST: ___________________________
LESLIE CAVIGLIA, CITY CLERK APPROVED BY CITY ATTORNEY
___________________________
STATE OF CALIFORNIA)
COUNTY OF TULARE ) ss.
CITY OF VISALIA )
I, Leslie Caviglia, City Clerk of the City of Visalia, certify the foregoing is the full and true Ordinance 2026-01 passed and adopted by the Council of the City of Visalia at a regular meeting held on April 6, 2026, and certify a summary of this ordinance will be published in the Visalia Times Delta.
Dated: April 06, 2026 LESLIE CAVIGLIA, CITY CLERK
By Reyna Rivera, Chief Deputy City Clerk
814
ORDINANCE NO. 2026-01
EXHIBIT “A” OF ORDINANCE NO. 2026-01,
AN ORDINANCE OF THE CITY COUNCIL
APPROVING A PREZONING AND CHANGE OF ZONE NO. 2025-06
WHICH PERTAINS TO THE TULARE COUNTY OFFCE OF EDUCATION.
BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF VISALIA:
Section 1: The zone classifications of the Zoning Map shall be changed as follows, upon the effective date of Annexation No. 2025-03.
815
Resolution No. 2026-20
RESOLUTION NO. 2026-20
A RESOLUTION OF APPLICATION BY THE CITY OF VISALIA REQUESTING THE
CITY OF VISALIA TO INITIATE PROCEEDINGS FOR FILING WITH THE TULARE COUNTY LOCAL AGENCY FORMATION COMMISSION ANNEXATION NO. 2025-03 AND DETACHMENT OF PROPERTY FROM COUNTY SERVICE AREA NO. 1, PERTAINING TO THREE PARCELS TOTALING 37.5 ACRES. THE SITE WOULD BE
ZONED QP (QUASI-PUBLIC) WHICH IS CONSISTENT WITH THE GENERAL PLAN LAND USE DESIGNATION OF PUBLIC/INSTITUTIONAL. THE SITE IS LOCATED AT 6200 SOUTH MOONEY BOULEVARD AND 11720 AND 11836 AVE 264 (APNS: 122-470-003, 122-480-004, 122-480-008, and 122-480-018) WHEREAS, Annexation No. 2025-03 is a request to annex three parcels totaling
37.5 acres into the City limits. The three parcels will be zoned QP (Quasi-Public) which is consistent with the General Plan Land Use Designation of Public/Institutional for the project site. The site is located at 6200 South Mooney Boulevard and 11720 and 11836 Ave 264 (APNs: 122-470-003, 122-480-004, 122-480-008, and 122-480-018); and WHEREAS, the City Council of the City of Visalia desires to initiate proceedings for annexation to said city of territory described on the attached legal description and map herein as Exhibit “B”; and
WHEREAS, the Council of the City of Visalia desires to annex said property to the City of Visalia for the following reasons: The annexation will contribute to and facilitate orderly growth and development of both the City and the territory proposed to be annexed; will facilitate and contribute to the proper and orderly layout, design and construction of streets, gutters, sanitary and storm sewers and drainage facilities, both within the City and within the territory proposed to be annexed; and will provide and facilitate proper overall planning and zoning of lands and subdivision of lands in said City and said territory in a manner most conducive of the welfare of said City and said territory; and WHEREAS, this proposal is made pursuant to the Cortese-Knox-Hertzburg Local Government Reorganization Act of 2000, commencing with Section 56000 of the Government Code of the State of California; and
WHEREAS, the territory proposed to be annexed is uninhabited per Government Code Section 56046; and
WHEREAS, the property proposed to be annexed is adjacent to City Limits; and 816
Resolution No. 2026-20
WHEREAS, the territory proposed to be annexed is located in Voting District 2 as identified in the Election District Map adopted by the City Council on February 22, 2022, per Resolution No. 2022-11; and
WHEREAS, the Council of the City of Visalia, after a 10-day public notification period, held a public hearing on April 6, 2026, and found the project consistent with the General Plan; and
WHEREAS, the proposed project was previously evaluated pursuant to the California Environmental Quality Act (CEQA) by the Tulare County Office of Education which acted as the Lead Agency for the project. Tulare County Office of Education prepared an Initial Study and Mitigated Negative Declaration (MND) for the project and, following a 30-day circulation of the document for public review, the Lead Agency adopted the Mitigated Negative Declaration and approved moving forward with the project finding that, with implementation of identified mitigation measures, the project would not result in significant environmental impacts; and
WHEREAS, the City, acting as a Responsible Agency for purposes of CEQA, is required to consider the environmental effects of the project as shown in the environmental document prepared by the Tulare County Office of Education before acting on the project and the City is required to impose feasible mitigation measures within its jurisdiction; and
WHEREAS, the Initial Study prepared for the project disclosed that no significant environmental impacts would result from this project subject to the mitigation measures identified in the Mitigation Monitoring and Reporting Program for the project. The table recognizes measures intended for, Agricultural Resources related to impacts to Prime Farmland, Biological Resources related to protecting nesting Swainsons hawks, roosting pallid bat and western mastiff bat, obtaining a permit from the SWRCB for impacts to jurisdictional waters, protecting nesting birds, and Cultural Resources related to whether any accidental discovery of unidentified archaeological remains or human remains during development or ground-moving activities in the project boundary; and WHEREAS, the City Council hereby makes the following findings with regard to the project:
1. That the Annexation is consistent with the intent of the General Plan and Zoning Ordinance, and is not detrimental to the public health, safety, or welfare, or materially injurious to properties or improvements in the vicinity. 817
Resolution No. 2026-20
2. That the proposed Annexation, which will re-designate 24.32-acres of AE-20 (Agricultural Exclusive 20-acre) County zone district to Q-P (Quasi-Public) City zone district, will not impose new land uses or development that will adversely affect the subject site or adjacent properties.
3. That the parcel is not located within an Agricultural Preserve.
4. That the parcel will be annexed into Voting District 2 per the Council Election Voting District Map.
5. That the Tulare County Office of Education prepared an Initial Study and Mitigated Negative Declaration (MND) for the project and, following circulation of the document for public review, Tulare County Office of Education adopted the Mitigated Negative Declaration and approved moving forward with the project finding that, with implementation of identified mitigation measures, the project would not result in significant environmental impacts. Tulare County Office of Education consulted with City staff on the preparation of the Initial Study and MND.
The City has independently reviewed and considered the Initial Study and MND, together with the administrative record associated with the Lead Agency’s approval of the project, and finds that the environmental document adequately evaluates the environmental impacts of the project. Therefore, staff recommends the Mitigated Negative Declaration be adopted for this project.
NOW, THEREFORE, BE IT RESOLVED that the Council of the City of Visalia requests the following actions:
1. Application is hereby made to the Executive Officer of the Local Agency Formation Commission (LAFCO), County of Tulare, State of California, for an annexation of territory illustrated in the map attached as Exhibit “A”.
2. Proceedings shall be taken for this annexation proposal pursuant to Title 5, Division 3, Part 3 of the California Government Code and other relevant provisions of the Cortese-Knox-Hertzberg Local Government Reorganization Act of 2000.
3. In conjunction with the proceedings being taken for this annexation proposal, application is also hereby being made to the Executive Officer of the Local Agency Formation Commission, County of Tulare, State of California, for detachment from County Service Area No. 1.
4. The Council hereby requests waiver of the conducting authority proceedings in accordance with Government Code Section 56663(c).
5. Upon annexation, the territory shall be zoned Q-P (Quasi-Public) consistent with the pre-zoning designated by the General Plan Land Use Map. 818
Resolution No. 2026-20
6. Upon annexation, the territory shall be assigned to Voting District 2 and the Election District Map adopted on February 22, 2022, per Resolution No. 2022-11 shall be amended to reflect the new territory assigned to Voting District 2.
7. The City Clerk of the City of Visalia is authorized and directed to file a certified copy of this resolution with the Executive Officer of Tulare County LAFCO.
8. The applicant(s) shall enter into a Pre-Annexation Agreement with the City which memorializes the required fees, policies, and other conditions applicable to the annexation. The Pre-Annexation Agreement is attached herein as Exhibit “B”. The agreement is subject to approval as to form by the City Attorney and subject to clerical and form modifications as approved by the City Manager.
PASSED AND ADOPTED: April 6, 2026 LESLIE B. CAVIGLIA, CITY CLERK
STATE OF CALIFORNIA )
COUNTY OF TULARE ) ss.
CITY OF VISALIA )
I, Leslie B. Caviglia, City Clerk of the City of Visalia, certify the foregoing is the full and true Resolution 2026-20 passed and adopted by the Council of the City of Visalia at a regular meeting held on April 6, 2026.
Dated: April 6, 2026 LESLIE B. CAVIGLIA, CITY CLERK
By Reyna Rivera, Chief Deputy City Clerk
819