SCE’s Charge Ready Transport (CRT) Program offers low-to no-cost electrical system upgrades to support the installation of electric vehicle (EV) charging equipment for qualifying vehicles. This program provides a unique opportunity for fleet operators choosing to acquire electric vehicles by providing support and reducing the costs with installing the necessary charging equipment.

When a customer is approved to participate in the program, SCE will design, construct, and install the necessary infrastructure on both the utility-side and customer-side of the electric meter. If the customer prefers, they can perform the customer-side of the meter electrical work and receive a rebate. Additional rebates are available to school districts, transit agencies, and eligible companies within disadvantaged communities.

This program provides a great opportunity for
fleet owners and other operators of industrial
vehicles including:
• Medium and heavy-duty trucks, shuttles,
and vans
• Transit buses
• School buses
• Transportation refrigeration units
• Airport ground support equipment
• Port equipment
• Forklifts and other off-road equipment

CHARGE READY TRANSPORT
Clean Energy to Fuel Southern California’s
Electric Vehicle Truck and Bus Fleets
Program Highlights
1 SCE will:
• Perform on-site visits to evaluate site’s electrical infrastructure needs. • Develop utility-side and customer-side of the meter cost estimates. • Design, secure permit, project manage and install the necessary infrastructure. Participants will have the option to instead perform the necessary work on their side of the meter and receive a make-ready rebate.2 • Install a separate meter dedicated to the EV charging infrastructure and waive customer demand charges through 2030 for EV rates TOU-EV-8 and TOU-EV-9.
• Make final inspections once the charging equipment is installed.

Customer Requirements:
• Lease or purchase at least two medium or heavy-duty battery powered EVs or convert at least two fossil-fuel vehicles to electric. • Select, purchase and install SCE approved charging equipment in the quantity approved by SCE.
• Keep the charging equipment operational for at least ten years. • Provide data related to charging equipment usage for a minimum of five years (on-road vehicles only).
• Grant easement may be required.
sce.com/CRT
1 Additional terms & conditions apply.
2 SCE will provide a rebate of the lesser of 80% of the customer participant actual installation cost or 80% of SCE’s average direct cost for installing the customer-side make-ready infrastructure.

Interested? Let’s talk.

Call your SCE Account Manager or
email chargereadytransport@
sce.com if you have questions or
want to find out how
this program may work for your
business.

You can also visit sce.com/CRT
for more information.