CITY OF VISALIA
Corporation Yard Master Plan (RFP No. 25-26-45)
REVISED: SEPTEMBER 14, 2026
VISALIA CIVIC CENTER VISALIA EMERGENCY COMMUNICATIONS CENTER
P O M O N A W A T E R R E S O U R C E S
HEADQUARTERS & MAINTENANCE YARD
T U S T I N W A T E R A D M I N B U I L D I N G ,
CORPORATE YARD, & EOC
WESTMINSTER CORPORATE YARD
W A L N U T C R E E K
CORPORATE YARD
S A N T A C R U Z C O U N T Y
SANITATION DISTRICT
A C C E S S S E R V I C E S A N T E L O P E V A L L E Y P A R A T R A N S I T
OPERATIONS & MAINTENANCE CENTER
A C C E S S S E R V I C E S P A R A T R A N S I T
OPERATIONS & MAINT. CENTER
Why Our Team?
Significant
experience with:
Public Works,
Corporate, & City
Yards
Maintenance Services
Facilities
LEED Silver, Gold,
Platinum & Net Zero
Energy Facilities
Southern California
Experience with
Projects of Similar
Size, Scale, & Needs in
the Region
Unparalleled corporate yard expertise
and portfolio.
Local project experience and delivery
from Concept to Keys.
Highlighted
Projects:
Visalia Emergency
Communication Center
Visalia Civic Center
Visalia Fire Station
No.51
Tustin Water Admin
Building, Corporate
Yard, & EOC
Westminster Corporate
Yard
Access Services
Southwest Region
Paratransit Operations
& Maintenance Center
Demonstrated development experience
managing projects from assessment
through implementation.
CONFIDENTIAL
California Civil Code § 3426.1 (d); California Evidence Code section 1040 and 1060; California Government Code section 6254(k); Freedom of Information Act, 5 U.S.C. § 552(b)(4) DO NOT RELEASE WITHOUT GRIFFIN STRUCTURES’ CONSENT & REDACTIONS
TABLE OF CONTENTS
A. General Information 1
B. Proposed Program Approach 11
C. Staff Qualifications & Related Experience 16
D. Proposed Fee Structure 41
E. Conflict of Interest Statement 42
Appendix 43
September 14, 2026
City of Visalia
Purchasing Division
707 W. Acequia Avenue, Visalia, CA 93291
RE: City of Visalia Corporation Yard Master Plan (RFP No. 25-26-45) Dear Selection Committee Members,
Griffin Structures is pleased to submit this proposal to assist the City of Visalia in developing a comprehensive Corporation Yard Master Plan.
We understand that this effort is about more than evaluating buildings and preparing conceptual site plans. The City is seeking a roadmap for how its operational campus should evolve over the coming decades to support a growing community, changing workforce needs, expanding fleet requirements, alternative fueling technologies, and increasingly complex service delivery demands. The fundamental question is not simply what improvements are needed, but rather whether the existing Corporation Yard can continue to support the City’s long-term operational needs and, if so, what investments should be prioritized to maximize efficiency, resiliency, and value.
At Griffin, we specialize in helping public agencies answer exactly these types of questions. Unlike firms that approach master planning primarily through the lens of architecture or engineering, Griffin serves as an owner’s representative and strategic planning advisor. Our role is to help agencies make informed decisions regarding facilities, operations, funding, implementation, and long-term capital investment. We bring together facility assessment, operational programming, financial planning, cost estimating, implementation strategy, and stakeholder engagement into a single planning process designed to support decision-making.
Our team has successfully delivered similar assessments, strategic facility master plans, operational studies, and implementation strategies for public agencies throughout California, including public works facilities, corporation yards, fleet maintenance operations, fire stations, police facilities, civic campuses, and other essential service infrastructure.
Through these efforts, we have helped agencies evaluate future growth, operational efficiency, facility modernization opportunities, funding strategies, and phased implementation approaches while maintaining uninterrupted service delivery.
For Visalia, we believe the greatest value of this planning effort will be providing City leadership with a clear and defensible framework for future decision-making. The final Master Plan should not only identify what improvements are needed, but establish when they should occur, how they should be prioritized, what they are likely to cost, and how they can be implemented while maintaining ongoing operations. Ultimately, the plan should serve as a practical guide for future capital investment rather than a document that sits on a shelf.
Griffin also brings the benefit of prior experience working with the City of Visalia and familiarity with the City’s organizational structure, operational stakeholders, decision-making processes, and capital planning environment. While we recognize that this effort must stand on its own merits, our existing understanding of the City’s facilities planning objectives and operational culture will allow our team to focus less time learning the organization and more time evaluating opportunities, validating future needs, and developing actionable recommendations. We believe this familiarity will accelerate stakeholder engagement, improve planning efficiency, and ultimately provide greater value to the City throughout the master planning process.
We appreciate the opportunity to submit our qualifications and look forward to the possibility of partnering with the City on this important initiative. Should you have any questions regarding our proposal, please do not hesitate to contact us.
Sincerely,
Dustin Alamo, CCM, DBIA, LEED AP, DRE #01930629
Vice President Strategic Services & Principal-In-Charge P: (949) 497-9000 x263 | E: [email protected] We hereby acknowledge receipt of all addenda.
1 TECHNOLOGY DRIVE, BLDG i, STE 829 , IRVINE, CA | 949 497 9000 | WWW.GRIFFINSTRUCTURES.COM
STANTON CORPORATE YARD
A. GENERAL INFORMATION
A. G eneral I nformation GRIFFIN STRUCTURES 1
Founded in 1981, Griffin Structures is a diversified
Owner's Representative / Program, Project and
Construction Management firm serving public,
private, non-profit, and institutional sectors.
With hundreds of projects completed across
California, Griffin brings deep expertise in
planning and delivering complex facilities,
with particular experience in public works
projects within the Central Valley communities
as well as in the development of maintenance
yards.
Griffin Structures maintains over four decades
of stability in providing public sector, industry
leading service to our clients. We offer a wealth
of supportive resources pertaining to specialists
well-versed in the delivery of public amenities
with direct experience local to the City.
Firm Introduction
Firm Name & Address
Griffin Structures, Inc.
1 Technology Drive Building i, Suite 829
Irvine, CA 92618
Telephone No. & Email Address
949.497.9000 x263
[email protected]
Federal Tax ID
330756139
Owners / Officers
Griffin Structures, Inc. is solely owned by Roger
Torriero, CEO.
Organization Type
California “S” Corporation
Number of Years in Business
Griffin Structures has been serving the public,
private and non-profit sector for 45 years.
Account Representative
Dustin Alamo, Vice President
(See telephone no. & email address to the left)
Surety & Business Tax Certification Info
Griffin Structures acknowledges the information
requested in the RFP related to surety
information and business tax certification. This
information is being coordinated internally and
will be provided prior to contract execution, as
required by the City. Surety information will be
provided through the proposer’s bonding / surety
representative, and business tax certificate
information will be provided by the proposer’s
administrative /business licensing representative.
The proposer confirms its intent to satisfy
all applicable bonding, insurance, licensing,
and business tax certification requirements
associated with this procurement.
CHIEF EXECUTIVE OFFICER
Roger Torriero
PRESIDENT
Jon Hughes
CHIEF FINANCIAL OFFICER
Mark Hoglund
EXEC VP + VICE PRESIDENTS
Operations
Strategic Services
Public-Private Partnerships
PROJECT EXECUTIVES
CORPORATE
Administration
Marketing
OPERATIONS
Program &
Construction Mgmt.
Strategic Services
A. G eneral I nformation GRIFFIN STRUCTURES 2
By researching and evaluating current
and future needs and engaging users
before facility planning begins, Griffin
Structures can assist clients in creating
a framework for solid, informationbased decision-making, providing clear options and tradeoffs for initial capital
outlay, facility delivery methods and
the budgetary considerations of future
maintenance and operating costs.
Available Strategic Services are included
below.
Strategic Services
STRATEGIC SERVICES AVAILABLE
Space Efficiency Studies
Operational Assessments
Needs Assessment
Space Planning
Programming
Facility Condition Assessment
Benchmarking Studies
Feasibility Studies
Capital Assessment
Campus Master Planning
Phasing Analysis
Implementation Strategies
Relocation Planning &
Management
Portfolio Utilization Analysis
Sustainability
F I N A L
REPORT
PROJECT
O R I E N T A T I O N
/ KICKOFF
D A T A
GATHERING
C O N C E P T
C O S T &
P R E L I M I N A R Y
SCHEDULE
NEEDS
A S S E S S M E N T
ANALYSIS
CONCEPTUAL
PLANTS
D E T A I L E D
S P A C E
PROGRAM
TYPICAL PROCESS MAP
A. G eneral I nformation GRIFFIN STRUCTURES 3
DESCRIPTION
Griffin Structures provided Program and
Construction Management services for
the City of Tustin Water Administration
Building, Corporate Yard & Emergency
Operations Center project, featuring
modern administrative offices, fleet and
maintenance facilities, operational support
spaces, and a resilient EOC.
VALUE + SIZE
$15,200,000 | 17,300 SF
REFERENCE
City of Tustin
Jason Churchill
Deputy Public Works Director
(714) 573-3355
[email protected]
RELEVANCY
Corporate Yard Programming, MultiUser Yard Master Plan
T U S T I N W A T E R A D M I N I S T R A T I O N B U I L D I N G , C O R P O R A T E Y A R D &
EMERGENCY OPERATIONS CENTER TUSTIN, CA
References & Referrals
DESCRIPTION
Griffin Structures provided Program and
Construction Management services for
the Westminster Corporation Yard project,
including demolition of a 29,000 SF facility,
construction of a new 40,000 SF operations
building, upgraded yard circulation,
modernized shop and storage areas, and a
10,000 SF Police training expansion.
VALUE + SIZE
$20,000,000 | 40,000 SF
REFERENCE
City of Westminster
Marwan Youssef, PE
Public Works Director (Ret.)
(714) 548-3460
[email protected]
RELEVANCY
Corporate Yard Programming
WESTMINSTER CORPORATE YARD WESTMINSTER, CA
DESCRIPTION
Griffin provided Program and Construction
Management services for the Southwest
Region Paratransit Operations and
Maintenance Facility. The project focuses
on a phased build out strategy using a
progressive design build approach. Each
phase of the project ensures that ongoing
site activity is maintained while facilities
are optimized into a functional yard
supporting administrative, maintenance,
and parking for their operation.
VALUE + SIZE
$40,000,000 | 76,000 SF
REFERENCE
Access Services
F Scott Jewell
Director, Administration Access
Services
[email protected]
(213) 270-6000
RELEVANCY
Corporate Yard Programming
A C C E S S S E R V I C E S S O U T H W E S T R E G I O N P A R A T R A N S I T O P E R A T I O N S & MAINTENANCE CENTER COMPTON, CA
A. G eneral I nformation GRIFFIN STRUCTURES 4
07/09/2026
Forms
A. G eneral I nformation GRIFFIN STRUCTURES 5
Griffin Structures, Inc.
1 Technology Dr, Building i, Suite 829, Irvine, CA 92618 Dustin Alamo
Vice President
07/09/2026
Forms
A. G eneral I nformation GRIFFIN STRUCTURES 6
Griffin Structures, Inc.
1 Technology Dr, Building i, Suite 829, Irvine, CA 92618 07/09/2026
Dustin Alamo, Vice President
Forms
A. G eneral I nformation GRIFFIN STRUCTURES 7
Forms
Griffin Structures, Inc.
1 Technology Dr, Building i, Suite 829, Irvine, CA 92618 Griffin Structures Inc.
Dustin Alamo 07/09/2026
Roger Torriero, CEO
A. G eneral I nformation GRIFFIN STRUCTURES 8
Griffin Structures, Inc.
1 Technology Dr, Building i, Suite 829, Irvine, CA 92618 Dustin Alamo
Vice President
07/09/2026
Forms
A. G eneral I nformation GRIFFIN STRUCTURES 9
Forms
Vice President
Dustin Alamo
1 Technology Dr, Building i, Suite 829, Irvine, CA 92618 Griffin Structures, Inc. 330756139
07/09/2026
(949) 497-9000 x263
07/09/2026
A. G eneral I nformation GRIFFIN STRUCTURES 1 0
Forms
Vice President
07/09/2026
Dustin Alamo
Griffin Structures, Inc.
T U S T I N W A T E R A D M I N I S T R A T I O N B U I L D I N G ,
CORPORATE YARD & EMERGENCY OPERATIONS CENTER
B. PROPOSED PROGRAM APPROACH
B. P roposed P rogram A pproach GRIFFIN STRUCTURES 1 1
Project Understanding
The City of Visalia seeks a comprehensive Corporation Yard Master Plan that will provide a long-term roadmap for modernizing, optimizing, and expanding the City’s primary operational campus in support of essential municipal services. Located on approximately 25 acres at 335 N. Cain Street, the Corporation Yard serves as the operational hub for Public Works, Fleet Maintenance, Streets, Traffic Safety, Solid Waste, Parks, Trails, Urban Forestry, Buildings, and related support functions. The facility has evolved over time to support growing operational demands and now serves a workforce and fleet operation that exceeds the functional capacity of many of its existing facilities.
Our understanding is that the City is seeking more than a traditional facility assessment. Rather, the City desires a data-driven planning effort that evaluates existing facility conditions, operational workflows, space utilization, staffing growth, fleet evolution, alternative fuel transitions, and long-term service demands to determine the most effective path forward. This includes evaluating whether future needs can be accommodated within the existing Corporation Yard footprint or whether expansion, consolidation, redevelopment, or utilization of alternative City-owned properties should be considered.
A successful master planning effort must balance operational efficiency, employee safety, fleet functionality, infrastructure modernization, sustainability goals, and fiscal responsibility. Equally important will be engaging operational staff throughout the planning process to ensure recommendations reflect the realities of daily service delivery while establishing a practical and implementable roadmap for future capital investment. We recognize that maintaining uninterrupted municipal operations during future implementation phases will be a critical consideration influencing both facility planning and phasing recommendations.
Given the complexity of the site and the interrelationship between operational divisions, we believe the greatest value to the City will come from a planning process that combines facility condition assessments, operational programming, site planning, implementation strategy development, and financial feasibility analysis into a single integrated master planning effort. The resulting Master Plan should serve as a decision-making framework that positions Visalia to strategically invest in its operational facilities over the next twenty years while maintaining flexibility to adapt to future workforce, fleet, technology, and sustainability initiatives.
P O M O N A W A T E R R E S O U R C E S
HEADQUARTERS & YARD
B. P roposed P rogram A pproach GRIFFIN STRUCTURES 12
Proposed Program
Approach
T A S K 1 - P R O J E C T P L A N N I N G A N D
COORDINATION
A successful master planning effort begins with
establishing clear objectives, decision-making
processes, communication protocols, and stakeholder
expectations. Griffin will work closely with City
leadership and project stakeholders to confirm
project goals, refine the work plan, establish project
governance, and create a roadmap for stakeholder
engagement throughout the planning process.
Because the Corporation Yard supports numerous City
departments and operational functions, maintaining
alignment throughout the planning process will
be critical to ensuring recommendations are both
operationally practical and organizationally supported.
Griffin will provide ongoing project management,
coordination, and communication to keep the project
moving efficiently while maintaining transparency and
stakeholder involvement.
Activities
• Conduct kickoff meeting with City leadership and
project stakeholders
• Confirm project objectives, schedule, deliverables,
and communication protocols
• Establish project governance and review
procedures
• Facilitate monthly coordination meetings
• Maintain project schedule, action items, and
decision log
T A S K 2 - S T A K E H O L D E R A N D
STAFF ENGAGEMENT
The success of any Corporation Yard Master Plan
is directly influenced by the participation of the
individuals who operate and maintain the facility on
a daily basis. Griffin will facilitate a collaborative
planning process designed to capture operational
insights, validate future needs, and build consensus
around potential improvements. Working closely with
City staff, we will engage leadership, supervisors,
operational personnel, and key stakeholders to
understand existing challenges, operational goals,
and future requirements. This will occur both thru
questionnaires and in-person interviews help ensure
recommendations reflect both strategic objectives and
day-to-day operational realities.
Activities
• Develop stakeholder engagement plan and
stakeholder roster
• Conduct departmental interviews and operational
workshops
• Facilitate site tours with operational staff
• Establish and facilitate Advisory Group meetings
• Document stakeholder feedback and planning
priorities
T U S T I N W A T E R A D M I N B U I L D I N G ,
CORPORATE YARD & EOC
B. P roposed P rogram A pproach GRIFFIN STRUCTURES 13
T A S K 3 - D A T A C O L L E C T I O N ,
F A C I L I T Y A S S E S S M E N T , A N D
OPERATIONAL PROGRAMMING
This task represents the foundation of the master
planning effort and will establish a comprehensive
understanding of how the Corporation Yard functions
today and what will be required to support future
operations. Griffin will evaluate existing facilities,
infrastructure, operational workflows, staffing
levels, fleet operations, storage functions, and site
utilization to identify constraints, opportunities,
and future requirements. Building upon the facility
assessment, Griffin will work with City staff to develop a comprehensive operational space program that
defines current and projected needs over the planning
horizon. Special attention will include differentiating the nuances between needs and wants. This analysis
will provide the basis for evaluating future alternatives and investment strategies.
Activities
• Review existing plans, studies, staffing data, fleet
inventories, and operational information
• Conduct facility condition assessments and
operational evaluations
• Assess site circulation, storage areas, fleet
operations, fueling systems, and support
infrastructure
• Evaluate building systems, accessibility, safety,
security, and operational functionality
• Identify constraints, deficiencies, and
modernization opportunities
• Develop operational space program and future
growth projections
• Evaluate future staffing, fleet, storage, parking,
and infrastructure requirements
• Assess opportunities involving adjacent and
alternative City-owned properties
T A S K 4 - C O N C E P T U A L D E S I G N
AND SITE PLANNING
Using information gathered during the assessment and
programming phases, Griffin will develop conceptual
planning alternatives that address current deficiencies while supporting the City’s long-term operational
goals. Alternatives will explore varying approaches
to modernization, expansion, redevelopment,
consolidation, and future growth. Each alternative
will be evaluated based on operational efficiency,
implementation feasibility, flexibility, sustainability, safety, and overall value to the City.
Activities
• Develop up to three conceptual site layout
alternatives
• Evaluate operational adjacencies and workflow
efficiencies
• Analyze circulation, access, security, and safety
considerations
• Evaluate future expansion opportunities and
operational flexibility
• Incorporate sustainability and resiliency initiatives • Facilitate stakeholder review and alternative
evaluation workshops
• Refine preferred planning alternative
STANTON PUBLIC WORKS YARD
B. P roposed P rogram A pproach GRIFFIN STRUCTURES 14
T A S K 5 - C O S T E S T I M A T I N G A N D
IMPLEMENTATION STRATEGY
Once a preferred direction has been established,
Griffin will prepare planning-level cost estimates
and develop a practical implementation framework
designed to guide future investment decisions.
Recommendations will consider operational continuity,
funding constraints, phasing opportunities, and future
flexibility. Recognizing that implementation may occur
over many years, this phase will establish a clear
roadmap that allows the City to strategically advance
projects as funding becomes available.
Activities
• Prepare planning-level cost estimates for
alternatives
• Refine estimates for the preferred master plan
• Develop implementation sequencing and phasing
strategies
• Identify operational continuity considerations
• Establish capital improvement priorities
T A S K 6 - D R A F T A N D F I N A L
MASTER PLAN DEVELOPMENT
The final phase focuses on synthesizing the analysis,
recommendations, graphics, and implementation
strategies into a comprehensive Master Plan document
that will serve as the City’s roadmap for future
investment and decision-making. The final Master Plan
will be designed to support future budgeting, capital
planning initiatives, and policy discussions while
clearly communicating recommendations to City staff,
leadership, and elected officials.
Activities
• Prepare detailed Master Plan outline
• Develop Draft Master Plan
• Incorporate City and stakeholder comments
• Prepare Final Master Plan and supporting graphics
• Develop executive presentation materials
• Present findings and recommendations to City
Council
WESTMINSTER CORPORATE YARD
B. P roposed P rogram A pproach GRIFFIN STRUCTURES 1 5
Project Schedule
VISALIA EMERGENCY COMMUNICATIONS CENTER
C. STAFF QUALIFICATIONS & RELATED EXPERIENCE
C. S taff Q ualifications & R elated Ex perience GRIFFIN STRUCTURES 16 Santa Cruz Sanitation District Facilities Plan Pre-Development
STRATEGIC SERVICES PROVIDED PROGRAM / CONSTRUCTION MANAGEMENT Griffin Structures is assisting the county of Santa Cruz in the development of a Facilities Plan that will guide the District’s investment in current and future facilities. The D.A. Porath Sanitation Facility is an existing property that serves as the primary pumping station between the eastern County sewer system and the City of Santa Cruz Treatment Plant. There are three buildings on the 7.4-acre property: Pump Building, Services Building, and Storage Warehouse. D.A. Porath is located at 2750 Lode Street within the community of Live Oak in the unincorporated County.
The District also plans to acquire a smaller satellite operations facility in the southern portion of the District’s service range. Therefore, the Facilities Plan is needed to strategically allocate District resources between the two facilities and guide acquisition of the future satellite Operations Facility and development of Master Plans.
The scope of work generally includes the following project components:
• Programming Needs Analysis
• Operations and Staffing Plan
• Environmental Analysis of satellite Operations Facility property • Master Plan for satellite Operations Facility
VALUE
$20,000,000
SIZE
28,000 SF
DATES
2021 - Ongoing
CONTACT
County of Santa Cruz
Travis Cary
Director of Capital Projects
(831) 454-2339
[email protected]
FIRM EXPERIENCE
C. S taff Q ualifications & R elated Ex perience GRIFFIN STRUCTURES 17 Griffin Structures in partnership with LPA Design Studios, developed the Santa Cruz Sanitation District Facilities Plan. The study focused on adding additional operational square footage within the sites current footprint and
maximizing parking for fleet operations.
The Project Includes:
• Site evaluation
• User interviews and staff engagement
• Program evaluation
• Program test fits and blocking
• Conceptual design renderings
• Construction budget and phasing plan
Santa Cruz Sanitation District
Facilities Plan
CONCEPTUAL DESIGN AND SITE PLAN LAYOUTS
PROGRAM BLOCKING & TEST FITS
SITE ASSESSMENT
PROGRAMMING & CONCEPTUAL LAYOUTS
C. S taff Q ualifications & R elated Ex perience GRIFFIN STRUCTURES 18 Westminster Corporation Yard Pre-Development
STRATEGIC SERVICES PROVIDED PROGRAM & CONSTRUCTION MANAGEMENT Griffin Structures provided program management and feasibility assessments for the City of Westminster and their Public Works operations.
With an aging infrastructure and code violations throughout the yard, Griffin Structures was hired to perform a needs assessment on the future space requirements of the facility. Re-purposing some buildings, consolidating others, and repositioning the real estate into a logical, safe work flow was a solution our team developed while working with the City.
Future space needs and code requirements were evaluated as part of the project to ensure administrative space, and shop and storage areas would meet future service requirements. Operational & facility review including coordinated of civil, geotechnical, and environmental surveys. A 40,000 SF program was prepared through site assessment, user interviews, and facility reviews.
The final study outlined a phased approach to keep vehicle maintenance operations running through construction while the existing 29,000 SF Public Works facility was demolished to support the rebuild of the future building.
VALUE
$20,000,000
SIZE
40,000 SF
DATES
2013 - 2017
CONTACT
City of Westminster
Marwan Youssef, PE
Public Works Director (Ret.)
(714) 548-3460
[email protected]
FIRM EXPERIENCE
C. S taff Q ualifications & R elated Ex perience GRIFFIN STRUCTURES 19 Working with the City of Westminster, Griffin Structures developed a corporate yard plan that brought operations back to code requirements through structured renovations and new buildings while keeping yard functions active.
Griffin Structures supported the project through initial assessment, programming, conceptual design, and finally brought the project to fruition as project designated
program and construction managers.
The Project Includes:
• Site evaluation
• User interviews and staff engagement
• Program test fits and blocking
• Conceptual design renderings
• Construction budget and phasing plan
• Program & construction management
Westminster Corporate Yard
FUTURE SITE PLAN LAYOUTS
BLOCKING TEST FITS
INITIAL SITE ASSESSMENT
PROGRAMMING & CONCEPTUAL LAYOUTS
C. S taff Q ualifications & R elated Ex perience GRIFFIN STRUCTURES 2 0 Hayward Corporate Yard Pre-Development
STRATEGIC SERVICES PROVIDED FEASIBILITY STUDY & PROGRAMMING Griffin Structures teamed with LPA Architects to modernize the City of Hayward’s Corporation Yard addressing the evolving needs of the Public Works Utilities Division and Maintenance Services Department. The team is providing an in-depth needs assessment, site evaluation, master plan, building program, conceptual design, and a phased construction plan to ensure uninterrupted operations.
The project focuses on enhancing circulation and parking capacity on site through the development of a parking garage. The 80,000 SF primary building is re-developed as workshops, crew rooms, long term storage, and modern facility amenities. Sustainability was a key point in the project and program elements included EV charging initiatives, solar energy opportunities, and optimized space usage. The final plan is flexible to be phased and developed over the next ten years and support the Public Works department operations through future growth and Key focal points of the project include enhancing circulation and parking transformation.
VALUE
$136,000,000
SIZE
240,000 SF
DATES
2025 - 2026
CONTACT
City of Hayward
Alex Ameri
Director of Public Works
(510) 583-4700
[email protected]
FIRM EXPERIENCE
C. S taff Q ualifications & R elated Ex perience GRIFFIN STRUCTURES 21 Partnering with LPA Design Studios, Griffin Structures
worked with the City of Hayward to develop the Hayward
Corporate Yard Feasibility Plan and Needs Assessment.
The plan evaluates corporate yard operations and
consolidates yard activities into two buildings freeing up access and circulation throughout the yard.
The Project Includes:
• Site and circulation evaluation
• Facility condition assessment
• User interviews and staff engagement
• Program evaluation
• Conceptual test fits and blocking
• Construction budget and phasing plan
Hayward Corporate Yard
PHASING PLANS
PROGRAM TEST FITS
INITIAL SITE ASSESSMENT
PROGRAMMING & CONCEPTUAL LAYOUTS
C. S taff Q ualifications & R elated Ex perience GRIFFIN STRUCTURES 22 Whittier City Yard Pre-Development
STRATEGIC SERVICES PROVIDED FEASIBILITY STUDY & PROGRAM Griffin Structures is working with the City of Whittier to assess their City Yard operations and develop a 20 year future program to support ongoing operations. The yard is located in Northwest Whittier and surrounded by the active Whittier Greenway Trail and Hadley Street. City officials are seeking options for modernizing the yard operations within their current footprint.
Griffin Structures provided an in-depth site assessment, facility condition evaluation, and space program in support of master plan efforts for yard operations. This ambitious project serves as a strategic guide for the City, enabling phased renovations and systematic budgeting over the next 5, 10, and 15 years. At the heart of this initiative lies a thorough examination of existing buildings, site circulation, and major site utilities, ensuring that each aspect of the City Yard is ready to meet future demands.
VALUE
$20,000,000
SIZE
47,000 SF
DATES
2025 - 2025
CONTACT
Leon Vasquez
Public Works Manager
(562) 567-9528
[email protected]
FIRM EXPERIENCE
C. S taff Q ualifications & R elated Ex perience GRIFFIN STRUCTURES 2 3 The Whittier City Yard Needs Assessment and Planning
Study evaluates the City’s yard operations and utilizes future-focused programming to develop a new yard
layout that prioritizes site access, vehicle circulation, and spatial optimization.
The Project Includes:
• Site evaluation
• Parking and circulation analysis
• Facility condition assessment
• User interviews and staff engagement
• Program evaluation
• Conceptual test fits and blocking
Whittier City Yard
PROGRAM TEST FITS
SITE ASSESSMENT
PROGRAMMING & CONCEPTUAL LAYOUTS
C. S taff Q ualifications & R elated Ex perience GRIFFIN STRUCTURES 24
DESCRIPTION
Griffin Structures assessed the feasibility of a shared Corporate Yard facility for the County of San Mateo, and the Cities of Belmont, San Carlos, and Redwood City,
consolidating their existing yards that support essential public works functions. To assess the feasibility of a
joint-use yard, the study evaluated the 17.33-acre Countyowned site that offers sufficient area to accommodate a consolidated facility. The team explored various facility management models presenting governance frameworks for
a shared facility. A proposed program for the joint facility supported consolidated services with suggestions for more efficient operations to streamline work processes. The study evaluated the logistical, operational, and financial viability of this joint facility, focusing on streamlining operations, enhancing resource sharing, and optimizing space while
addressing each city’s specific needs.
The final program consisted of 130,000 SF in building space with a total of 12.6 acres in development and a preliminary construction cost of $315 million. The study culminates in a comprehensive program, governance framework, timeline,
and preliminary budget, giving the four jurisdictions a robust foundation to evaluate the future of a shared corporate yard.
VALUE + SIZE
$315,000,000 | 130,000 SF
OWNER + CONTACT
County of San Mateo
Justin Mates
Deputy County Executive
(650) 363-4136
[email protected]
DATES
January 2025 | July 2025
San Mateo Joint Corporate Yard Pre-Development
SAN MATEO, CA
FIRM EXPERIENCE
C. S taff Q ualifications & R elated Ex perience GRIFFIN STRUCTURES 25
DESCRIPTION
Griffin was initially selected by the to develop a Space Needs Analysis for the relocation of the City’s Public Works Maintenance Yard. Subsequent to the Space Needs Analysis, Griffin Structures also provided Program and Construction Management services for the maintenance yard relocation.
The project involves two phases: (1) Phase 1 of the project encompasses site improvements at three separate locations throughout the City.
The improvements will include new material bins; new
waste disposal facilities; steel canopies for protection of materials for compliance with WQMP requirements; the
construction of a new Bomb Squad storage facility complete with CCTV; evidence vehicle storage; security fencing; and mechanical, electrical and plumbing improvements. (2)
Phase 2 will encompass the comprehensive renovation of
the existing storage warehouse into office facilities for the relocation of facility maintenance staff, traffic control staff, theater scene assembly facility, structural retrofit, and the construction of a new mechanical mezzanine.
VALUE + SIZE
$18,000,000 | 40,000 SF
CLIENT + CONTACT
City of Walnut Creek
Rich Payne
Public Services Manager
(925) 943-5899 x2437
[email protected]
DATES
June 2016 | June 2019
Walnut Creek Public Works Yard Pre-Development
CITY OF WALNUT CREEK, CA
FIRM EXPERIENCE
C. S taff Q ualifications & R elated Ex perience GRIFFIN STRUCTURES 26 Griffin Structures collaborates closely with our cost estimators, and architects to ensure effective communication between the team, that design concepts are translated into practical, constructible plans aligned with client expectations, and information gathered is routinely shared and coordinated across each task in the project. We work in tandem with the City to coordinate the project monitoring site assessment activity, capturing progress, and working collectively to deliver projects on schedule and in budget. Our primary goal is to streamline all aforementioned collaborative efforts, ensuring a well-executed project which aligns with client expectations, operating as one team and as an overall extension of client staff.
In order to offer the highest value to the City of Visalia, we have included a highly experienced, comprehensive team of individuals to provide specialty services for this project. Resumes for our proposed team outlining their education, experience, and credentials are provided within the following pages. We additionally confirm that no person designated as “key” to the project shall be removed or replaced without the prior written concurrence of the City.
Team Organization
PRIMARY CONTACT
C O S T
ESTIMATING
Ariana Ramzian
CMIT
Griffin Structures
Sr. Program Analyst
S P A C E
A S S E S S M E N T
Hailey Muller
Griffin Structures
Project Manager
Dustin Alamo
CCM, DBIA, LEED AP, DRE
BROKER #01930629
Griffin Structures
Principal-In-Charge
Krista Beatie
CMIT
Griffin Structures
Sr. Program Analyst
Ryan Craven
CPE, CMIT
HLCM
Cost Estimator
Project Manager
SUBCONSULTANTS
C O N C E P T U A L
DESIGN
Jeremy Hart
AIA, LEED AP BD+C, NCARB
LPA Design Group Inc.
Project Architect
C. S taff Q ualifications & R elated Ex perience GRIFFIN STRUCTURES 2 7 Dustin Alamo
CCM, DBIA, LEED AP, DRE BROKER #01930629
Principal-in-Charge
EDUCATION
Bachelor of Architecture, University of
Colorado, Boulder
CERTIFICATION
Certified Construction Manager (CCM)
Design-Build Institute of America (DBIA)
Associate
LEED Accredited Professional
State of California Licensed Real Estate
Broker DRE #01930629
AFFILIATIONS
Construction Management Association of
America, Member
Design-Build Institute of America (DBIA),
Member
U.S. Green Building Council, Member
YEARS OF EXPERIENCE
22 QUALIFICATIONS
Dustin serves as the Vice President of Strategic Services for Griffin Structures, Inc. His primary responsibilities include the executive management of all needs assessment and master planning projects ranging by facility type, including corporate yards, administration facilities, library and cultural arts buildings, law enforcement facilities, fire safety facilities, community and senior centers, utility facilities, and others. In addition, Dustin is skilled at developing long-term facility plans (ranging from $10M to $400M) which incorporate future space requirements, phasing considerations, and capital funding mechanisms such as bonds, repositioning real estate assets, and public private partnerships (P3).
With a formal background in architecture, Dustin is
knowledgeable in aspects of design. He understands the process and skill-set required for developing and building architectural programs, site plans, floor plans, elevations, and technical detailing. Dustin is a Certified Construction Manager (CCM), LEED accredited professional and a licensed Real Estate Broker in the state of California.
REPRESENTATIVE EXPERIENCE
Visalia Capital Improvement Plan, CA
Visalia Civic Center
Visalia Emergency Communication Center
Visalia Fire Stations
Tustin Water Administration Building, Corporate Yard & EOC, CA Westminster Corporate Yard, CA
Access Services, Southwest Region Paratransit Ops. & Maint. Facility, CA Pomona Water Resources Headquarters & Yard, CA
Access Services, Antelope Valley Paratransit Ops. & Maint. Facility, CA Stanton Corporate Yard, CA
Santa Cruz County Sanitation District Facilities Plan & Maint. Yard, CA Walnut Creek Corporate Yard Pre-Development, CA
Hayward Corporate Yard Pre-Development, CA
San Mateo County Joint Use Corporation Yard Pre-Development, CA Whittier Corporate Yard Pre-Development, CA
Morgan Hill Maintenance & Ops. Yard Pre-Development, CA Laguna Beach Facilities Master Plan Corporate Yard, CA
Orange Corporate Yard Pre-Development, CA
C. S taff Q ualifications & R elated Ex perience GRIFFIN STRUCTURES 28 Hailey Muller
Project Manager
EDUCATION
Master of Data Analytics, Oregon State
University
Bachelor of Business Planning & Market
Analysis, Whitworth University
YEARS OF EXPERIENCE
10 QUALIFICATIONS
Hailey Muller is a Project Manager with extensive experience leading complex planning initiatives that require adaptable strategies and cross-disciplinary coordination. She specializes in guiding projects through changing requirements by aligning scope, schedule, and resources to optimize facility and land use outcomes. Her work on public sector and higher education projects emphasizes collaborative leadership, data-informed decision-making, and the successful delivery of comprehensive master plans, space utilization studies, and design efforts.
Hailey’s strong foundation in data analytics, supported by her master’s studies in data science and over ten years of experience in the facilities planning industry, enables her to manage projects efficiently while driving teams toward the highest and best use of space.
REPRESENTATIVE EXPERIENCE
Hayward Corporate Yard Pre-Development, CA
San Mateo County Joint Use Corporation Yard Pre-Development, CA Santa Maria Utilities Yard Pre-Development, CA
Whittier City Yard Pre-Development, CA
San Bernardino County Strategic Facilities Master Plan, CA Laguna Beach Facilities Master Plan Corporate Yard, CA
Chaffey Community College District Master Plan, Rancho Cucamonga, CA Grossmont Cuyamaca Community College District
Amendment 5 Program Moves, El Cajon, CA
Cuyamaca Space Utilization, Rancho San Diego, CA
Space Utilization Studies, El Cajon, CA
Riverside Community College District IETTC Master Plan, CA San Bernardino Community College District Facilities Master Plan, CA Bucknell University Lower Campus Planning Study, Lewisburg, PA Cuyahoga Community College Master Plan, Highland Hills, OH Des Moines Area Community College Master Plan, Ankeny, IA Florida International University Campus Master Plan, Miami, FL Lane College Campus Master Plan, Jacksonville, FL
Marist College Campus Plan Update, Poughkeepsie, NY
McKinstry Coolidge High School Renovations, Coolidge, AZ Millersville University Study, Millersville, PA
C. S taff Q ualifications & R elated Ex perience GRIFFIN STRUCTURES 2 9 Ariana Ramzian
CMIT
Sr. Program Analyst
EDUCATION
Master of Arts, Interior Architecture &
Design, Academy of Art University
Bachelor of Science, Managerial
Economics, University of California, Davis
CERTIFICATION
Construction Manager in Training (CMIT)
AFFILIATIONS
Construction Management Association of
America, Member
YEARS OF EXPERIENCE
8 QUALIFICATIONS
As part of Griffin Structures’ Strategic Services division, Ariana is an experienced space planner. Her background in providing needs assessments and auditing allows for Ariana to effectively interview stakeholders, analyze data, and formulate conclusions and recommendations on operational efficiencies. As a Project Analyst at Griffin, Ariana utilizes her process skills to then prepare staff and space projections while organizing an assortment of detailed documentation in an orderly, logical manner. Ariana develops building and needs assessments, feasibility studies, master plans, and technical reports. Ariana is an excellent communicator whose strengths include synthesizing complex data into tables, charts, and narratives which are easily comprehended by a variety of stakeholders.
REPRESENTATIVE EXPERIENCE
Access Services, Antelope Valley Paratransit Operations & Maintenance Facility, CA
Santa Cruz County Sanitation District Facilities Plan & Maint. Yard, CA Laguna Beach Facilities Master Plan, CA
Whittier City Yard Pre-Development, CA
OC Mosquito & Vector Control District, CA
San Bernardino County Strategic Facilities Master Plan, CA County of Orange Facilities Strategic Plan, CA
San Jacinto Civic Center, CA
Eastvale Civic Center (City Hall, Library, Senior & Community Center, Police Station, Fire Station), CA
OCERS Headquarters, Santa Ana, CA
San Juan Capistrano Paseo Adelanto Mixed-Use Housing & City Hall, CA Atwater Public Safety Master Plan, CA
Anaheim Civic Center, CA
Laguna Beach Community & Susi-Q Senior Center, CA
Jurupa Community Services District Maint. & Water Treatment Yard, CA Newport Beach Corporate Yard, CA
Inglewood Main Library & Innovation Center Renovation, CA Tustin Police Department, CA
Tustin Legacy Annex Space Planning (Parking, Recreation & Police) PreDevelopment, CA Monterey Public Safety Facility Feasibility Study, CA
C. S taff Q ualifications & R elated Ex perience GRIFFIN STRUCTURES 3 0 Krista Beatie
CMIT
Sr. Program Analyst
EDUCATION
Master of Interior Architecture, Chatham
University
Bachelor of Science, Brigham Young
University
CERTIFICATION
Construction Manager in Training (CMIT)
AFFILIATIONS
Construction Real Estate Women (CREW)
U.S. Green Building Council (USGBC)
YEARS OF EXPERIENCE
9 QUALIFICATIONS
As a Program Analyst for Griffin Structures, Krista Beatie serves in our Strategic Services division to assist the Griffin Structures team to provide early programming for all client types. With a Master’s in Interior Architecture at Chatham University, Krista Beatie has served on a variety of project types, from public safety facilities, educational institutions to commercial architecture and design.
Through her education and experience, Krista has developed a passion for sustainability and holistic design, assisting her clients to realize the full potential of their space.
REPRESENTATIVE EXPERIENCE
Whittier City Yard Pre-Development CA
San Mateo County Joint Use Corporation Yard Pre-Development, CA Santa Maria Utilities Department, CA
County of Orange Facilities Strategic Plan, CA
San Bernardino County Strategic Facilities Master Plan, CA Laguna Beach Facilities Master Plan, CA
Anaheim Civic Center, CA
Los Alamitos Civic Center, CA
Menifee City Hall, CA
San Jacinto Civic Center, CA
San Rafael LIbrary & Community Center, CA
Orange County Employees Retirement System (OCERS) HQ, CA Rancho Palos Verdes Civic Center (Community Center, Plaza, EOC/ Maintenance Yard, Council Chambers), CA
Laguna Beach Community & Susi-Q Senior Center, CA
Los Altos Police Department Predevelopment, CA
Los Alamitos Police Department, CA
Rancho Palos Verdes Civic Center (Community Center, Plaza, EOC/ Maintenance Yard, Council Chambers), CA
Atwater Public Safety Master Plan Predevelopment, CA
Oxnard Police Department Predevelopment, CA
Inglewood Main Library & Innovation Center Renovation, CA Anneliese Schools Facilities Master Plan, CA
Morgan Hill Corporate Yard, CA
OC Mosquito & Vector Control District, CA
C. S taff Q ualifications & R elated Ex perience GRIFFIN STRUCTURES 3 1 Ryan Craven
CPE, CMIT
Cost Estimator Project Manager
EDUCATION
Bachelor of Science, Construction
Engineering, National University, Costa
Mesa
CERTIFICATION
Certified Public Estimator (CPE)
Construction Manager in Training (CMIT)
AFFILIATIONS
American Society of Plumbing Engineers
(ASPE)
Association for the Advancement of Cost
Engineering (AACE)
Construction Management Association of
America, Member
YEARS OF EXPERIENCE
19 QUALIFICATIONS
Ryan is an expert in value engineering and construction cost estimating, including master planning, conceptual, schematic design development, and construction document phases. He is a skilled mediator, participating in change order preparation, validation, and negotiation. He has reconciliation experience with general contractors and subcontractors, and communicates well with all design team members, promoting open-door dialogue and effective project solutions.
REPRESENTATIVE EXPERIENCE
Visalia Capital Improvement Plan, CA
Visalia Civic Center
Visalia Emergency Communication Center
Visalia Fire Stations
Tustin Water Administration Building, Corporate Yard & EOC, CA Westminster Corporate Yard, CA
Pomona Water Resources Headquarters & Yard, CA
Santa Cruz County Sanitation District Facilities Plan & Maint. Yard, CA Stanton Corporate Yard, CA
Hayward Corporate Yard Pre-Development, CA
Morgan Hill Maintenance & Ops. Yard Pre-Development, CA County of Orange Facilities Strategic Plan, CA
San Bernardino County Strategic Facilities Master Plan, CA SchoolsFirst Federal Credit Union Headquarters, Tustin, CA Rancho Palos Verdes Civic Center (Community Center, Plaza, EOC/ Maintenance Yard, Sheriff Substation, Council Chambers), CA Eastvale Civic Center (City Hall, Library, Senior & Community Center, Police Station, Fire Station), CA
Buena Park Police Department Headquarters, CA
San Bernardino County, High Desert Government Center, Hesperia, CA San Juan Capistrano Paseo Adelanto Mixed-Use Housing & City Hall, CA San Bernardino County 323 Court Street, Public Defenders’ Building, CA Watsonville Civic Center, CA
Fullerton Multigenerational Community Center, CA
Laguna Beach Community & Susi-Q Senior Center, CA
Lake Forest Civic & Community Center, CA
Newport Beach Marina Park Community & Sailing Center, CA C. S taff Q ualifications & R elated Ex perience GRIFFIN STRUCTURES 32 Jeremy Hart
AIA, LEED AP BD+C, NCARB
Project Architect
EDUCATION
Bachelor of Architecture
Cal Poly Pomona
CERTIFICATION
Licensed Architect, California
No. 29148
LEED Accredited Professional
AFFILIATIONS
American Institute of Architects
U.S. Green Building Council
YEARS OF EXPERIENCE
27 QUALIFICATIONS
As Director of Civic + Cultural at LPA, Jeremy Hart designs with discovery and impact in mind. With more than 25 years of experience, he believes that the direction of design should reflect the will of the community.
As an architect and a history buff, Jeremy is driven by the desire to create and influence our environment in a meaningful way. He asserts that architects’ ability to create meaningful impressions on people can influence a community, interactions and the surrounding environment. Jeremy approaches each project like a puzzle that needs to be solved, uncovering each factor that may contribute to a project. Jeremy strives to learn how the project site and environment will inform the functional requirements of the building program and the values of the community.
REPRESENTATIVE EXPERIENCE
Hayward Corporate Yard Pre-Development, CA
Irvine Fire Station No.20, CA
County of Orange Civic Center Facilities Strategic Plan, Santa Ana, CA County of Orange Admin North, Santa Ana, CA
County of Orange Admin South, Santa Ana, CA
Laguna Beach Community & Susi-Q Senior Center, CA
Cathedral City Fire Station No. 411, CA
Salinas Police Services Headquarters, CA
Campbell Police Department Headquarters, CA
Chino Hills Government Center & City Hall, CA
Hesperia Police Department Headquarters, CA
San Bernardino County, CA
Government Center Public Defenders’ Building
High Desert Government Center Public Safety Operations Center Valley Communication Center 222 Hospitality Building
Brentwood City Hall & Council Chambers, CA
Hesperia Civic Center (City Hall & Library), CA
Santa Cruz County Sanitation District Master Plan, CA
West Hollywood Aquatics & Recreation Center, CA
Laguna Niguel Crown Valley Civic Center, CA
Chino Hills Library, CA
C. S taff Q ualifications & R elated Ex perience GRIFFIN STRUCTURES 33
DESCRIPTION
Griffin Structures has partnered with the City of Visalia to deliver a multi-phase Public Safety Capital Improvement Program that enhances the City’s emergency response,
public safety, and municipal operations. Following
the successful completion of the Visalia Emergency
Communications Center (VECC), which includes a stateof-the-art 3,500-square-foot dispatch center, Emergency Operations Center, and Fire Administration offices, Griffin Structures is providing Construction Management services for the next phase of the program. This includes construction of a new 50,000-square-foot Civic Center housing Public Safety Administration, City Finance, Council Chambers and a 16,500-square-foot Evidence Processing and Storage
Building as well as Fire Station 51, a new two-battalion fire station located on 1.46 acres adjacent to the City’s police headquarters.
Throughout the program, Griffin Structures has collaborated closely with City staff and design consultants to maintain uninterrupted emergency operations while delivering critical public infrastructure that supports Visalia’s long-term growth and service needs.
VALUE + SIZE
$113,000,000 | >100,000 SF
OWNER + CONTACT
City of Visalia
Mike Porter
Civil Engineer
[email protected]
(559) 713-4412
INVOLVEMENT
Program & Construction Management
STATUS OF COMPLETION
ECC: 2015 - 2017
Fire Station: 2024 - Ongoing
Civic Center: 2023 - Ongoing
Visalia Capital Improvement Plan
(Civic Center, Emergency Communications Center & Fire Station)
VISALIA, CA
C. S taff Q ualifications & R elated Ex perience GRIFFIN STRUCTURES 34
DESCRIPTION
Griffin Structures was selected by Access Services to provide Program and Construction Management services for the
Southwest Region Paratransit Operations and Maintenance Facility. The project will be implemented in multiple phases as funding becomes available. Access recently acquired
the building, and Phase One will focus on making the
facilities and site functional for interim use by the operator, alleviating parking demands at a secondary location. Phase Two will deliver maintenance bays and administrative
spaces while optimizing on-site parking capacity. Phase Three will introduce a parking structure to accommodate expanded operational needs in the future. To ensure
flexibility and cost control, the project is being delivered through a Progressive Design-Build approach, allowing
collaborative design solutions to be balanced with budget limitations at each stage.
VALUE + SIZE
$40,000,000 | 76,000 SF | 6 Acres
OWNER + CONTACT
Access Services
F Scott Jewell
Director, Administration Access Services
[email protected]
(213) 270-6000
INVOLVEMENT
Program & Construction Management
STATUS OF COMPLETION
November 2024 - In Progress
Access Services, Southwest Region Paratransit Operations & Maintenance Facility
CITY OF COMPTON, CA
C. S taff Q ualifications & R elated Ex perience GRIFFIN STRUCTURES 3 5
DESCRIPTION
Access Services (Access) is the ADA paratransit
transportation service provider for Los Angeles County.
Access serves the citizens of Los Angeles County by
providing ADA complaint accessible transportation services.
Griffin was selected to provide Program and Construction Management to assist in the identification of a property which will function as an operating facility in order to conduct paratransit operations in the Southern service
region.
Access Services operational service area is further defined as south from the northern city limits of Vernon, Maywood, Bell Gardens, Downey, Santa Fe Springs, and south from the city limits of Whittier to the Pacific Ocean. The property will likely feature a build-to-suit option with a turnkey 50,000 SF new facility including 3-4 acres of excess land.
We continue to assist Access Services in overseeing the design and bid package of the operating facility and related property improvements.
VALUE + SIZE
$26,800,000 | 50,000 SF
OWNER + CONTACT
Access Services
F Scott Jewell
Director, Administration Access Services
[email protected]
(213) 270-6000
INVOLVEMENT
Program & Construction Management
STATUS OF COMPLETION
June 2020 - In Progress
Access Services, Antelope Valley Paratransit (Fleet) Operations & Maintenance Facility
CITY OF EL MONTE, CA
C. S taff Q ualifications & R elated Ex perience GRIFFIN STRUCTURES 36
DESCRIPTION
Griffin Structures was selected to provide Program and
Construction Management services for the new Water
Resources Headquarters and Corporate Yard. This new
facility will include a modularly-constructed Administration Building (17,600 SF), new Warehouse (7,200 SF) and
Shops (8,900 SF) buildings, covered parking canopies and equipment storage (23,000 SF), site walls and gates (1,700 SF), covered material storage bins, vehicular and pedestrian concrete paving (130,000 SF) and landscape planting and irrigation (13,000 SF).
All additions will be supported with below and aboveground utility systems, site lighting, and site-wide security and access control systems. A special emphasis has also been placed on maximizing the use of this facility by designing spaces for multi-use and flexible sizing, as well as ease-ofmaintenance, durability, and the overall sustainability of the facility.
VALUE + SIZE
$32,000,000 | 34,000 SF
OWNER + CONTACT
Pomona Water Resources Department
Chris Diggs
Water Resources Director
(909) 620-2251
[email protected]
INVOLVEMENT
Program & Construction Management
STATUS OF COMPLETION
October 2022 - June 2024
AWARDS
LEED Silver
Pomona Water Resources Headquarters & Yard
CITY OF POMONA, CA
C. S taff Q ualifications & R elated Ex perience GRIFFIN STRUCTURES 37
DESCRIPTION
Griffin Structures provided Program and Construction
Management for the new Tustin Corporate Yard and
Emergency Operations Center. The project consisted
of demolition of an existing fire station and facilities maintenance office trailers; and construction of a new
17,284 SF corporate yard office building including a stateof-the-art Emergency Operations Center, back up emergency dispatch center, and RACES (Radio Amateur Civil Emergency Service) room.
The facility includes a new wellness center for City staff use, locker rooms, new water lab, facilities maintenance offices, break room, and conference rooms. The project also encompasses new covered parking, photo voltaics, and a
new landscape demonstration garden.
VALUE + SIZE
$16,000,000 | 18,000 SF
OWNER + CONTACT
City of Tustin
Jason Churchill
Deputy Public Works Director
(714) 573-3355
[email protected]
INVOLVEMENT
Program & Construction Management
STATUS OF COMPLETION
June 2018 - January 2021
*Although this project is outside of the three year window, we felt it pertinent to include with our submission.
Tustin Water Administration Building, Corporate Yard &
Emergency Operations Center
CITY OF TUSTIN, CA
C. S taff Q ualifications & R elated Ex perience GRIFFIN STRUCTURES 3 8
DESCRIPTION
With an aging infrastructure and code violations throughout the yard, Griffin Structures was hired to perform a needs assessment on the future space requirements of the facility.
Re-purposing some buildings, consolidating others, and
repositioning the real estate into a logical, safe work flow was a solution our team developed while working with the City. A phased approach was developed to keep vehicle
maintenance operations running through construction.
The existing 29,000 SF Public Works facility was demolished and replaced with a 40,000 SF building. The project was delivered on a design-build basis. Team responsibility
included Program and Construction Management and
coordination of civil, geotechnical, and environmental
surveys.
VALUE + SIZE
$20,000,000 | 40,000 SF
OWNER + CONTACT
City of Westminster
Marwan Youssef, PE
Public Works Director (Ret.)
(714) 548-3460
[email protected]
INVOLVEMENT
Program & Construction Management
STATUS OF COMPLETION
October 2013 - October 2017
*Although this project is outside of the three year window, we felt it pertinent to include with our submission.
Westminster Corporate Yard
CITY OF WESTMINSTER, CA
C. S taff Q ualifications & R elated Ex perience GRIFFIN STRUCTURES 39
DESCRIPTION
We performed PMCM services for the City of Stanton Public Works Department’s New Corporate Yard facility. This 1.5 acre project featured the following:
• 6,000 SF Administration Building
• Emergency Operations Center
• Community Room (that can be reserved by the public
for special groups and meetings)
• 8,000 SF Warehouse
• Vehicle Maintenance Bays with canopy structures
• Fueling Station
The Facility was designed to fully sustainable standards with numerous “green” energy-saving features incorporated throughout the building. The new facility replaced the
outdated city yard and provided optimized and efficient space for all departmental functions.
VALUE + SIZE
$5,200,000 | 14,000 SF
OWNER + CONTACT
City of Stanton
Nick Guilliams
Former Public Works Dir.
(651) 554-3213
[email protected]
INVOLVEMENT
Program & Construction Management
STATUS OF COMPLETION
June 2008 - June 2010
*Although this project is outside of the three year window, we felt it pertinent to include with our submission.
AWARDS
APWA Project of the Year
CMAA Project Achievement Award
Stanton Corporate Yard
CITY OF STANTON, CA
C. S taff Q ualifications & R elated Ex perience GRIFFIN STRUCTURES 4 0
PUBLIC SECTOR PARTNERSHIP
As our references will attest, Griffin Structures possesses extensive experience within the public sector, including publicly built projects of virtually every delivery method, public-sector decision making processes, procurement, consensus building, formal submittals and approval processes. We are ready to adjust and finely tailor our documentation to aid the City in moving this project forward. We regularly attend and participate in workshops with industry partners and stakeholders, as well as prepare presentations to Planning Departments, Councils, Citizens Oversight Committees, and additional stakeholders. We hope that you will ascertain our ability to maneuver projects through many departments and approval processes from our 45 years of relevant and representative experience. This well-rounded experience will serve the City well and will allow our team to provide and successfully turn over fully functional facilities to your community.
DEMONSTRATED COST & SCHEDULE SUCCESS
As a result of Griffin Structures’ extensive experience with protecting Client interests utilizing our hybrid design, construction, and owner mindset, Griffin Structures projects are historically completed on schedule and budget.
Additionally, we offer an unparalleled level of technical expertise that allows us to unlock unique cost savings opportunities through use of innovative design considerations, as well as forward thinking planning to get ahead of potential road blocks, agency approvals, jurisdictional considerations, industry barriers, or potential schedule impacts.
This success includes Griffin Structures’ completion of the $400M County of Orange Civic Center ahead of schedule and with $8.1M returned savings to the County. This project along with several local projects local to the City which are slated for timely delivery on budget is only a representation of the plethora of public sector work delivered in a manner which exceed client and community expectations.
DESIGN RECOGNITION
Within our extensive portfolio, several of the projects of which we have served have been recognized for innovative design approaches and accomplished in a way that well balances their delivery to achieve client goals.From the first all-electric recreation amenity in the state for the City of Mountain View, we have additional recognized projects, including countless AIA distinct projects, LEED Platinum, Net Zero, AIA Top 10 COTE, and additional designations. This includes LEED Platinum and Net Zero Energy Half Moon Bay Library, Net Zero Energy Burlingame Community Center, and several others.
COUNTY OF ORANGE CIVIC CENTER
WESTMINSTER CORPORATE YARD
D. PROPOSED FEE STRUCTURE
D. P roposed F ee S tructure GRIFFIN STRUCTURES 41
SEALED FEE PROPOSAL
As outlined in the RFP, the Proposed Fee Structure is provided as a separate, sealed envelope, well as within a separate folder titled “Fees” on the USB drive.
This fee section remains blank in the four (4) copies of the proposal.
P O M O N A W A T E R R E S O U R C E S H E A D Q U A R T E R S & YARD
E. CONFLICT OF INTEREST STATEMENT
E. C onflict of I nterest S tatement GRIFFIN STRUCTURES 42 Conflict of Interest
Griffin Structures does not have any financial, business or other relationship with the City or any member of the City staff that may have an impact on the outcome of the project. Additionally, we do not have any current clients who may have a financial interest in the outcome of the project.
Thank you.
STANTON PUBLIC WORKS YARD
A C C E S S S E R V I C E S A N T E L O P E V A L L E Y P A R A T R A N S I T
OPERATIONS & MAINTENANCE CENTER
APPENDIX
A ppendi x GRIFFIN STRUCTURES 4 3
Addendum Acknowledgement
Griffin Structures, Inc. 07/09/2026
A ppendi x GRIFFIN STRUCTURES 4 4
Exceptions
We have reviewed the City of Visalia’s Sample Contract - Professional Services Agreement and kindly request the following proposed exceptions and deviations.
S A M P L E C O N T R A C T - P R O F E S S I O N A L S E R V I C E S A G R E E M E N T F O R T H E C I T Y
OF VISALIA CORPORATION YARD MASTER PLAN
• XII. INDEMNIFICATION AND INSURANCE. Section A. Respectfully request to delete “and CITY designated volunteers”
• XII. INDEMNIFICATION AND INSURANCE. Section A. Insert “to the extent” following “liability or consequential damages”. Section reads: “As respects acts, errors, or omissions in the performance of services, CONSULTANT agrees to indemnify and hold harmless CITY, it s elected and appointed officers, employees from and against any and all claims, demands, losses, defense costs, liability or consequential damages to the extent arising directly out of CONSULTANT’s negligent acts, errors or omissions in the performance of his/her services under the terms of this Agreement, except to the extent those arise out of the negligence of CITY.
• XII. INDEMNIFICATION AND INSURANCE. Section B. Respectfully request to delete “and designated volunteers”
• XII. INDEMNIFICATION AND INSURANCE. Section C. Respectfully request to delete “agents” • XII. INDEMNIFICATION AND INSURANCE. Section C. Respectfully request to delete “and volunteers” • XII. INDEMNIFICATION AND INSURANCE. Section C. Insert “to the extent” following “or consequential damages of any kind or nature”. Section reads: “As respects all acts or omissions which do not arise directly out of the performance of services, including but not limited to those acts or omissions normally covered by general and automobile liability insurance, CONSULTANT agrees to indemnify, defend (at CITY’s option), and hold harmless CITY, its elected and appointed officers, employees, representatives from and against any and all claims, demands, defense costs, liability, or consequential damages or any kind or nature to the extent arising out of or in connection with CONSULTANT’s (or CONSULTANT’s subcontractors, if any) performance or failure to perform, under the terms of this Agreement; except to the extent those which arise out of negligence of CITY.”
• XII. INDEMNIFICATION AND INSURANCE. Section F - Insurance Policy Clause. Request to delete from clause “limited in scope or coverage”
• XII. INDEMNIFICATION AND INSURANCE. Section F - Commercial General Liability and Comprehensive Automobile Liability Policies. Request to delete from clause “representatives and volunteers”
VISALIA CIVIC CENTER VISALIA EMERGENCY COMMUNICATIONS CENTER
P O M O N A W A T E R R E S O U R C E S
HEADQUARTERS & MAINTENANCE YARD
T U S T I N W A T E R A D M I N B U I L D I N G ,
CORPORATE YARD, & EOC
WESTMINSTER CORPORATE YARD
W A L N U T C R E E K
CORPORATE YARD
S A N T A C R U Z C O U N T Y
SANITATION DISTRICT
A C C E S S S E R V I C E S A N T E L O P E V A L L E Y P A R A T R A N S I T
OPERATIONS & MAINTENANCE CENTER
A C C E S S S E R V I C E S P A R A T R A N S I T
OPERATIONS & MAINT. CENTER