ACTION:
____________________________
Clerk/Secretary
Department: Engineering Item No: C7
Prepared by:

Michael Hilker, Capital Projects Manager
Erin Adams, Management Analyst Meeting Date: March 8, 2022 Approved by:

Greg Mayer, City Engineer
Patrick Johnson, City Manager Agenda Location: Consent Calendar SUBJECT: CIP NO. 8301 – SMILAX-MIMOSA SEWER CAPACITY IMPROVEMENTS PROJECT – FIRST AMENDMENT TO THE AGREEMENT WITH TC CONSTRUCTION COMPANY, INC.

RECOMMENDATION:

1. Adopt Buena Sanitation District Resolution No. 2022- , approving the first amendment to the agreement with TC Construction Company, Inc. for design/build services for the Smilax-Mimosa Sewer Capacity Improvements Project (CIP No. 8301).

2. Adopt Buena Sanitation District Resolution No. 2022- , adopting an addendum to the Supplemental Program Environmental Impact Report for the 2017 Comprehensive Sewer Master Plan Update State Clearinghouse No. 2007091072, regarding the Smilax-Mimosa Sewer Capacity Improvements Project (CIP No. 8301).

CORRELATION TO CITY COUNCIL GOALS: Routine operational item not directly corresponding to a specific City Council goal.

PRIOR ACTION: On November 10, 2020, the District Board adopted Resolution No. 2020-30 approving an agreement with TC Construction Company, Inc. for design/build services for the Smilax-Mimosa Sewer Improvements Project (Vote: 5-0).

On June 23, 2020, the District Board adopted Resolution No. 2020-23 approving the Six-Year Capital Improvement Program, the Capital Project Budget for Fiscal Years 2020/21 and 2021/22, and authorizing appropriations for Fiscal Years 2020/21 and 2021/22 capital projects (Vote: 5-0).

On November 14, 2017, the District Board adopted Resolution No. 2017-10 certifying the Final Supplemental Program Environmental Impact Report Prepared for the 2017 Comprehensive Sewer Master Plan, adopting environmental findings pursuant to the California Environmental Quality Act, and adopting a mitigation, monitoring, and report program (Vote: 5-0).

STATEMENT ON THE SUBJECT: Capital Improvement Program (CIP) Project No. 8301, the Smilax- Mimosa Sewer Capacity Improvements Project, identified in the City's 2017 Comprehensive Sewer Master Plan Update, addresses capacity deficient sewer pipelines located in portions of the County of San Diego and the City of San Marcos that are part of the Buena Sanitation District, in the vicinity of Smilax Road and Mimosa Avenue. A Vicinity Map is included as Exhibit 6. The project includes approximately 1,300 linear feet of new 12-inch polyvinyl chloride (PVC) pipeline, and eight new manholes within Mimosa Avenue and AGENDA
REPORT

CITY COUNCIL

COMMUNITY DEVELOPMENT COMMISSION

SUCCESSOR AGENCY

BUENA SANITATION DISTRICT

JOINT POWERS FINANCING AUTHORITY
03/08/2022 C7 1 of 159
Approved above recommendation, adopted the following: 1) Buena Sanitation District Resolution No. 2022-8; and 2) Buena Sanitation District Resolution No. 2022-9. Vote: 5-0

MEETING DATE: MARCH 8, 2022 PAGE 2
SUBJECT: SMILAX-MIMOSA SEWER CAPACITY IMPROVEMENTS PROJECT— FIRST AMENDMENT TO THE AGREEMENT WITH TC CONSTRUCTION COMPANY, INC.
partially in Smilax Road to relieve overcapacity sewer mains in the project area. The majority of the improvements will be constructed by open-cut trenching methods. Trenchless construction methods are required for two segments due to the presence of existing reinforced concrete box culverts which includes pipe jacking and pipe ramming. Dewatering may be required based on the water table at time of construction. Nine existing manholes in the project area will also be rehabilitated with structural improvements.

First Amendment to the Design-Build Agreement. On November 10, 2020, City Council awarded the Design-Build Team (DBT) of TC Construction Company, Inc. (TC Construction) the design portion of the project. The DBT has completed 90-percent of the design, and staff has negotiated a Guaranteed Maximum Price (GMP) with the DBT and recommends approval of the first amendment to establish the GMP of$2,500,553.77. The proposed amendment to the agreement with TC Construction establishes the GMP and allows the DBT to begin Phase 2 construction services and Phase 3 operation/startup services as specified in Sections 6 and 7 of the original agreement (Exhibit 4).

Addendum to the Program Environmental Impact Report. An addendum to the 2017 certified Supplemental Program Environmental Impact Report (SPEIR; State Clearinghouse #2007091072)was prepared for the Smilax-Mimosa Sewer Capacity Improvements Project. The 2017 SPEIR updates tiers from the 2008 Sewer Master Plan Update Program Environmental Impact Report for the City of Vista Comprehensive Sewer Master Plan. The addendum to the SPEIR has been prepared in conformance with the provisions of the California Environmental Quality Act (CEQA) and the State Guidelines for the Implementation of the CEQA. The Smilax-Mimosa Sewer Capacity Improvements Project would not have any significant effects on the environment that either have not already been analyzed in the prior SPEIR or that are more significant than previously analyzed. Pursuant to CEQA Guidelines Section 15168(c), CEQA does not apply to such effects.

Staff recommends adopting the Addendum to the SPEIR for the Smilax-Mimosa Sewer Capacity Improvements Project (CIP No. 8301).

FISCAL IMPACT: The cost of this amendment is $1,969,516.73, for a new contract ceiling of $2,500,553.77 for TC Construction to provide design-build services for the Design and Construction of the Smilax-Mimosa Sewer Capacity Improvements Project Phase 2 and Phase 3. Sufficient funding is available in the Fiscal Years 2020/2021 and 2021/2022 Capital Improvement Budget for CIP No. 8301 Smilax-Mimosa Sewer Capacity Improvements Project.

EXHIBITS:

1. Buena Sanitation District Resolution No. 2022- , approving the first amendment to the agreement with TC Construction Company, Inc. for design/build services for the Smilax-Mimosa Sewer Capacity Improvements Project (CIP No. 8301)

2. Buena Sanitation District Resolution No. 2022- , adopting an addendum to the Supplemental Program Environmental Impact Report for the 2017 Comprehensive Sewer Master Plan Update State Clearinghouse No. 2007091072, regarding the Smilax-Mimosa Sewer Capacity Improvements Project (CIP No. 8301)

3. First Amendment with TC Construction Company, Inc.

4. Original Contract with TC Construction Company, Inc. (on file in the City Clerk's Office)

5. Addendum to the Supplement Program Environmental Impact Report

6. Location Map
03/08/2022 C7 2 of 159

RESOLUTION NO. 2022-

A RESOLUTION OF THE BOARD OF DIRECTORS OF THE

BUENA SANITATION DISTRICT, APPROVING THE FIRST AMENDMENT TO THE AGREEMENT WITH TC CONSTRUCTION COMPANY, INC. FOR

DESIGN/BUILD SERVICES FOR THE SMILAX-MIMOSA SEWER CAPACITY IMPROVEMENTS PROJECT (CIP NO. 8301)
The Board of Directors of the Buena Sanitation District does resolve as follows:

1. Findings. The Board of Directors hereby finds and declares the following:

A. On November 10, 2020, the Buena Sanitation District entered into an agreement with TC Construction Company, Inc. for design/build services for the Smilax-Mimosa Sewer Capacity Improvements Project (CIP No. 8301).

B. The Buena Sanitation District now desires to amend the agreement with TC Construction Company, Inc. to establish the Guaranteed Maximum Price (GMP) of $2,500,553.77.

2. Action.

A. The First Amendment to the agreement between the Buena Sanitation District and TC Construction Company, Inc. for design/build services for the Smilax-Mimosa Sewer Capacity Improvements Project establishing the Guaranteed Maximum Price (GMP) of $2,500,553.77 is approved, and the Chairperson is authorized to execute the amendment.

3. Adoption. PASSED AND ADOPTED at a meeting of the Board of Directors of the Buena Sanitation District held on March 8, 2022, by the following vote:

AYES:

NOES:

ABSTAIN:

JUDY RITTER, CHAIRPERSON
APPROVED AS TO FORM: ATTEST:

DAROLD PIEPER, DISTRICT COUNSEL KATHY VALDEZ, CLERK OF THE BOARD By: By:

APPROVED
Darold Pieper
20220215160543
001057142 EXHIBIT 1
03/08/2022 C7 3 of 159

RESOLUTION NO. 2022-

A RESOLUTION OF THE BOARD OF DIRECTORS OF THE

BUENA SANITATION DISTRICT, ADOPTING AN ADDENDUM TO THE

SUPPLEMENTAL PROGRAM ENVIRONMENTAL IMPACT REPORT FOR THE 2017 COMPREHENSIVE SEWER MASTER PLAN UPDATE STATE
CLEARINGHOUSE NO. 2007091072, REGARDING THE SMILAX-MIMOSA SEWER CAPACITY IMPROVEMENTS PROJECT (CIP NO. 8301)
The Board of Directors of the Buena Sanitation District does resolve as follows:

1. Findings. The Board of Directors hereby finds and declares the following:

A. On November 14, 2017, the Board of Directors adopted the Buena Sanitation District Resolution No. 2017-10 certifying the Final Supplemental Program Environmental Impact Report prepared for the 2017 Comprehensive Sewer Master Plan, adopting environmental finding pursuant to the California Environmental Act, and adopting a Mitigation, Monitoring, and Reporting Program.

B. The proposed project does not create substantial changes or new information of substantial importance that was not previously examined in the SPEIR; therefore, preparation of a subsequent EIR is not required under CEQA. The proposed project which is the basis of this addendum may be approved administratively as an activity covered within the scope of the 2017 Comprehensive Sewer Master Plan SPEIR.

2. Action.

A. The addendum to the Supplemental Program Environmental Impact Report for the 2017 Comprehensive Sewer Master Plan Update State Clearinghouse No. 2007091072, regarding the Smilax-Mimosa Sewer Capacity Improvements Project (CIP No. 8301) is approved by the District Council.
001057162 EXHIBIT 2
03/08/2022 C7 4 of 159

RESOLUTION NO. 2022-

BOARD OF DIRECTORS OF THE BUENA SANITATION DISTRICT
PAGE 2

3. Adoption. PASSED AND ADOPTED at a meeting of the Board of Directors of the Buena Sanitation District held on March 8, 2022, by the following vote:

AYES:

NOES:

ABSTAIN:

JUDY RITTER, CHAIRPERSON
APPROVED AS TO FORM: ATTEST:

DAROLD PIEPER, DISTRICT COUNSEL KATHY VALDEZ, CLERK OF THE BOARD By: By:

APPROVED
Darold Pieper
20220215161709
00105716 200105716.DOCX
03/08/2022 C7 5 of 159

FIRST AMENDMENT TO THE CONTRACT BETWEEN THE BUENA
SANITATION DISTRICT AND TC CONSTRUCTION COMPANY, INC. FOR

DESIGN/BUILD SERVICES FOR THE SMILAX-MIMOSA SEWER
IMPROVEMENTS PROJECT (CIP NO. 8301)
THIS FIRST AMENDMENT ("First Amendment") to the Contract between the Buena Sanitation District and TC Construction Company, Inc., dated November 10, 2020 ("Contract"), is made and entered into as of ("First Amendment Date"), by and between the Buena Sanitation District, a County Sanitation District ("District"), and TC Construction Company, Inc., a California corporation ("Contractor").

Recitals: District and Contractor now desire to enter into a First Amendment to the Contract by modifying the terms of the Contract.

NOW, THEREFORE, in consideration of these recitals and the mutual covenants contained herein, District and Contractor agree as follows:

1. The Guaranteed Maximum Price (GMP) is hereby established as $2,500,553.77 in accordance with Section 13 of the Contract including $531,037.04 in Phase I preconstruction and design services and a five percent contingency. A breakdown of the GMP is included as Exhibit A.

2. All other conditions of the Contract shall continue in full force and effect.

IN WITNESS WHEREOF, the parties have executed and entered into this First Amendment as of the First Amendment Date.

BUENA SANITATION DISTRICT, a County TC CONSTRUCTION COMPANY, INC., a Sanitation District California corporation
By: By:

JUDY RITTER, CHAIRPERSON
NAME/Title
ATTEST:

KATHY VALDEZ, CLERK OF THE BOARD By:

By: NAME/Title
APPROVED AS TO FORM:

DAROLD PIEPER, DISTRICT COUNSEL
By:

RISK MANAGEMENT REVIEW:

DOLORES GASCON, RISK MANAGER
By:

APPROVED
Darold Pieper
20220214142706
001056502 EXHIBIT 3
03/08/2022 C7 6 of 159

EXHIBIT A
Smilax-Mimosa Sewer Improvements-Rates&Fees Breakdown-GMP-Guaranteed Maximum Price-Rev. 1-26-22 Item ff Description Quantity Unit Unit Price Total General Conditions Insurance Costs @ 2% Grand Total

CONSTRUCTION SERVICES-PHASE II

2.01 Construction Survey Staking 1 LS $10,000.00 $10,000.00

2.02 Engineering Support for Cal Trans Encroach Permit 1 LS $5,000.00 $5,000.00

2.03 Environmental Coordination/MMRP/Permit Compliance 1 LS $6,500.00 $6,500.00

2.06 Engineering Participation in Weekly Meetings 1 LS $7,500.00 $7,500.00

2.07 Engineering Svcs for Submittal Reviews,Constructi 1 LS $7,500.00 $7,500.00

2.08 Community Liaison Services,Outreach,Notification 1 LS $14,000.00 $14,000.00

2.09 Geotechnical Inspection&Testing 1 LS $42,000.00 $42,000.00

2.10 Mobilization 1 LS $35,318.00 $35,318.00

2.11 Furnish&Implement WPCP,BMP'S,Street Sweeping 1 LS $28,126.00 $28,126.00

2.12 Potholing 1 LS $11,304.00 $11,304.00

2.13 Traffic Control 1 LS $86,904.00 $86,904.00

2.14 Shoring&Bracing 1 LS $29,531.00 $29,531.00

2.16 Construct New 12"PVC Sewer Main on Mimosa Ave 1302 LF $313.81 $408,580.62

2.17 Pipe Ram Beneath SDX1-Dual 6'x6'RCB 1 LS $31,148.00 $31,148.00

2.18 Pipe Ram Beneath SDX2-6'x8'RCB 1 LS $26,711.00 $26,711.00

2.19 New 4'Dia.Concrete Sewer Manholes 8 EA $19,695.00 $157,560.00

2.22 Clean&CCTV Inspection of 8"Sewer 1302 LF $4.55 $5,924.10

2.29 Cut In Manhole#9&Reconnect Sewer Lateral for 366 Smilax Rc 1 EA $26,593.00 $26,593.00

2.37 Manhole Rehab-Clean&Line w/Raven 405 9 EA $2,950.001 $26,550.00

2.38 Abandon&Fill Exist Sewer-Btwn New MH 8 and 3166 Smilax Rd 90 LF $45.60 $4,104.00

2.39 Trench Resurfacing-7"AC on 11"AB-35W 1302 LF $85.30 $111,060.60

2.40 Trench Grind&Overlay-1.5"D x 4.5'W 1302 LF $15.40 $20,050.80

2.41 Full Width Grind&Overlay-1"D 8172 SF $2.06 $16,834.32

2.42 Striping 1 LS $8,738.00 $8,738.00

2.43 Clean,Reinspect Pipelines Up&Downstream of MH 3173 1 LS $2,960.00 $2,960.00

ALLOWANCE ITEMS
AL1 Rock Breaking&Handling Allowance 160 CY $560.00 $89,600.00 AL2 Dewatering Allowance 1 LS $41,953.00 $41,953.00 AL3 Pipe&Fittings Escalation Allowance 1 LS $6,778.00 $6,778.00 AL4 Full Width Grind&Overlay-1"D-County ROW-Allowance 45000 SF $1.47 $65,970.00 CONSTRUCTION SERVICES PHASE II-SUBTOTAL $1,334,798.44 $157,097.00 $29,837.91 $1,521,733.35

OPERATION/START UP SERVICES-PHASE III

3.00 Final CCTV&Reports 1 LS $11,247.00 $11,247.00

3.01 Punch List Work 1 LS $9,063.00 $9,063.00

3.02 Demobilization&Site Clean-up 1 LS $17,038.00 $17,038.00

3.03 As-Builts&Closeout of Engineering Documentation 1 LS $4,500.00 $4,500.00

3.04 11 Month Post Construction Inspection 1 LS $15,773.00 $15,773.00

3.05 Engineering Support 1 LS $5,000.00 $5,000.00 OPERATION/START UP SERVICES-PHASE III-SUBTOTAL $62,621.00 $28,739.001 $1,827.201 $93,187.20 $1,397,419.441 $185,836.001 $31,665.111 $1,614,920.55 Change Order Rates:Cost+15%
15%Cost of Work Fee $242,238.08

1.0%Bond Costs $18,571.59
Grand Total $1,875,730.22
5%Contingencyl $93,786.51
Total w/Contingency $1,969,516.73
03/08/2022 C7 7 of 159

Original Contract with TC Construction Company, Inc.

On file in the City Clerk's Office
EXHIBIT 4
03/08/2022 C7 8 of 159

Smilax- Mimosa
Sewer Improvements Project
Addendum to the 2017 Comprehensive Sewer Master Plan
Supplemental Program Environmental Impact Report
Prepared for:

City of Vista &Buena Sanitation District
Engineering Department
200 Civic Center Drive
Vista, California 92084
Prepared by:

Michael Baker International
9755 Clairemont Mesa Boulevard,Suite 100
San Diego, California 92124
January 2022
EXHIBIT 5
03/08/2022 C7 9 of 159

Smilax-Mimosa Sewer Improvements Project
This page left blank intentionally.
03/08/2022 C7 10 of 159

Smilax-Mimosa Sewer Improvements Project

TABLE OF CONTENTS

1.0 INTRODUCTION AND PROJECT DESCRIPTION....................................................................... 1

1.1 Project Location........................................................................................................... 1

1.2 Project Background...................................................................................................... 1 ExistingConditions............................................................................................................... 2

1.3 Project Description ...................................................................................................... 3 Mimosa Avenue Sewer Realignment....................................................................................... 3 SpringdaleEstates................................................................................................................ 3 CoralTree Manor................................................................................................................. 4 CaltransCrossing................................................................................................................. 4 Construction ....................................................................................................................... 5 Operations and Maintenance................................................................................................ 5 AnticipatedPermits.............................................................................................................. 6

1.4 Purpose of this Addendum and Basis for Decision to Prepare Addendum............................11

1.5 Determination............................................................................................................12

1.6 Evaluation of Environmental Impacts.............................................................................13

2.0 ENVIRONMENTALINITIALSTUDYCHECKLIST......................................................................14 I. AESTH ETICS............................................................................................................14 II. AGRICULTURE AND FORESTRY RESOURCES..................................................................15 III. Al R QUALITY............................................................................................................17 IV. BIOLOGICAL RESOURCES...........................................................................................21 V. CULTURAL RESOURCES.............................................................................................25 VI. GEOLOGYANDSOILS................................................................................................29 VI I. G REEN HOUSE GAS EM I SSI ONS...................................................................................32 VI II. HAZARDS AND HAZARDOUS MATERIALS......................................................................34 IX. HYDROLOGY AND WATER QUALITY.............................................................................38 X. LAND USE AND PLANNING.........................................................................................43 XI. MINERALRESOURCES...............................................................................................46 XII. NOISE.....................................................................................................................47 XII I. POPULATION AND HOUSING......................................................................................51 XIV. PUBLIC SERVICES......................................................................................................52 XV. RECREATION...........................................................................................................54 XVI. TRANSPORTATION AND CIRCULATION.........................................................................55 XVI I. UTI LITI ES AN D SERVICE SYSTEMS................................................................................59 XVI II. MANDATORY FI NDI NGS ............................................................................................62

3.0 REFERENCES.................................................................................................................64

4.0 LIST OF PREPARERS........................................................................................................66 i
03/08/2022 C7 11 of 159

Smilax-Mimosa Sewer Improvements Project

LIST OF APPENDICES
A Biological Resources Documentation
B Cultural Resources Memorandum
C Geotechnica I Investigation

LIST OF FIGURES
Figure 1 Regional/Local Vicinity Map....................................................................................... 7 Figure 2 Mimosa Avenue Improvements Identified in CSMP........................................................ 8 Figure 3 Proposed Improvements............................................................................................ 9 Figure 4 Existing Conditions —Manhole Locations.....................................................................10 ii
03/08/2022 C7 12 of 159

Smilax-Mimosa Sewer Improvements Project
1 .0 INTRODUCTION AND PROJECT DESCRIPTION
This Addendum to the certified Supplemental Program Environmental Impact Report (SPEIR; State Clearinghouse [SCH] #2007091072)for the 2017 City of Vista (City)/Buena Sanitation District (District) Comprehensive Sewer Master Plan (CSMP) is intended to address infrastructure improvements previously identified for the Smilax Road/Mimosa Avenue Capital Improvements Project [(CIP)#8301].The 2017 CSMP SPEIR was preparedto provide an updated evaluationthe District's anticipated infrastructure improvement projects originally identified in the 2007 Sewer Master Plan Update(SMPU)and the associated certified City of Vista 2007Sewer Master Plan Update Program EIR(2008 PEIR;SCH No.2007091072).

The California Environmental Quality Act (CEQA)Guidelines Sections 15162 through 15164 set forth the criteria for determining the appropriate additional environmental documentation, if any, to be completed when there is a previously adopted Negative Declaration (ND)or a previously certified EIR covering the project forwhich a subsequent discretionary action is required.This Environmental Review Update Checklist Form has bee n pre pa red inaccordance wit hCEQAGuideIines Sect ion 15164(e)toexplainthe rationalefor determining whether any additional environmental documentation is needed for the subject discretionary action. In accordance with CEQA Guidelines Section 15164, this document tiers from the more recently certified 2017 CSMP SPEIR which updates the 2008 PEIR.The Buena Sanitation District serves as the lead agency, as defined by CEQA Guidelines Section 15367, for review and approval of the CEQA Addendum.

CEQA Guidelines Section 15164(a) states that the lead agency or responsible agency shall prepare an Addendum to a previously certified EIR if some changes or additions are necessary but none of the conditions described in Section 15162 calling for preparation of a Subsequent or Supplemental EIR have occurred. Pursuant to CEQA Guidelines §15164(e), the analysis provided herein is intended to evaluate whether a change in circumstances has occurred,or whether new information available forthe project since the time of certification of the 2017 CSMP SPEI R triggers the need to prepare a subsequent EIR or MND,to provide justification for the preparation and use of this Addendum. Pursuant to CEQA Guidelines §15164(d),this Addendum is intended to inform the District's consideration and action on the project. 1 .1 Project Location
Lands affected bythe proposed sewer infrastructure improvements are located in the City of San Marcos and the County of San Diego; refer to Figure 1, Regional/Local Vicinity Map, and Figure 3, Proposed Improvements.The affected land areas are generally located tothe north and south of State Route 78 (SR 78) between Mimosa Avenue to the west and just west of Community Drive to the east. The Buena Sanitation District provides sewer service for the project area, but it lies within the jurisdiction ofthe County and San Marcos.

All improvements would occur along existing sewer alignments within roadway rights-of-way or existing public easements, either currently under District ownership or other affected agencies,with exception of limited improvements within the Coral Tree Manor(apartments)and Springdale Estates(mobile home park) developments which would be located within existing public easements or on privately owned property. 1 .2 Project Background
The 2007 SMPU and 2017 CSMP were developed to restore theCity's sewersystemto an acceptable physical condition, provide adequate hydraulic capacity to minimize sanitary sewer overflows, and address newly approved State wastewater regulations. The 2008 PEIR and 2017 CSMP SPEIR provide comprehensive analyses of the sewer system and needed improvements through a combination of operations input, maintenance assessments, and hydraulic modeling resulting in several capacity- and condition-related capital improvement program recommendations involving thousands of sewer components,including those related to the proposed improvements(CI P#8301).
1 03/08/2022 C7 13 of 159

Smilax-Mimosa Sewer Improvements Project
The City of Vista 2007SMPU and 2017 CSMP identify four types of capital improvement projects(CI Ps)for implementation.These include the following:
• Category 1:CI Capacity and Condition Project(Hardscape Environs) • Category 2:CIP Capacity and Condition Projects(Cross-Country Environs) • Category3:Operations and Management(O&M)Program Operations and Pump Station Operations, Maintenance,and Rehabilitation;and
• Category4:Out-of-Service Area Project(s)
The improvements to the Smilax Road/Mimosa Avenue (CIP#8301)were originally identified in the 2007 SMPU and 2017 CSMP and were considered a Category 2(Cross-Country)CIP;however,such improvements have been revised based upon further analysis and,as currently designed,the alignment for the proposed Smilax Road/Mimosa Avenue sewer infrastructure improvements vary from that originally analyzed in the 2008 SM PU PEI R a nd 2017 CSM P SPEI R;refer to Figure 2,Mimosa Avenue I mprovements Identified in CSMP, and Figure 3, Proposed Improvements.

The proposed Cl P improvements (sewer realignment)would extend down the centerline of Mimosa Avenue within the existing right-of-way,are now considered to meet the Category 1(Hardscape)classification; refer to Section 1.4, Project Description. As such, the environmental impacts and required mitigation measures for the currently proposed project would be similartothose previously evaluated for Category 1 projects in the 2017 CSMP SPEI R.The proposed improvements would be implemented to redirect existing flows away from downstream pipelines having insufficient capacity and would not result in any new significant environmental impacts or mitigation measures compared to those evaluated in the previous 2008 SMPU PEI R and 2017 CSMP SPEI R, nor would it result in a greater degree of significance of impacts. For these reasons, CEQA review of the proposed improvements does not warrant preparation of a subsequent or supplemental EIR or Mitigated Negative Declaration. The proposed action is considered to be covered by the scope of the 2017 CSMP SPEI R.Therefore,the proposed project that is the basis of this Addendum may be approved by the District as a subsequent activity covered within the scope of the 2017 CSMP SPEI R.

Additionally, other associated activities (i.e., manhole construction and rehabilitation, pipe relining to support adequate wastewater flows and prevent leakage and/or failure,etc.)considered to be maintenance activities bythe District are proposed to ensure that the sewer infrastructure system continues to function properly and that adequate service can be provided to District customers. These improvements were not specifically identified as capital improvement projects in the 2007 SMPU or 2017 CSMP,and therefore,were not evaluated inthe associated El Rs.However,such improvements are considered and evaluated herein in association with CIP#8301,as appropriate.

Existing Conditions
The District has identified several sewer mains that have insufficient capacityor are structurally deficient in the vicinity of Smilax Road and Mimosa Avenue.To address these issues,a new bypass sewer line is proposed to be constructed in order to bypass flows around overloaded pipelines,and structurally deficient pipelines will be repaired. Such improvements are identified as Capital Improvement Project#8301 in the City of Vista's C I P.

The pipelines with insufficient capacity are located south of Mimosa Avenue, between Smilax Road and Poinsettia Avenue. These pipelines are installed in easements crossing through private property and environmentally sensitive areas, which make the installation of larger pipelines prohibitively difficult.

Instead,flows will be redirected awayfrom these pipelines with bypass sewers installed in Mimosa Avenue, south of SR 78.

Additionally, previous sewer assessments have shown that several sewer pipelines in the vicinity of the Springdale Estates a nd Cora I Tree Manor north of SR 78 have structura I deficiencies a nd infiltration through 2 03/08/2022 C7 14 of 159

Smilax-Mimosa Sewer Improvements Project
the pipe walls.Two oft hese pipelines,between manholes B03166 and B03168,are located with an area that mays upport environmentally sensitive resources and are difficult to access.

A previous assessment of the sewer main B03172-BO3173 reported concerns with its structural integrity and hydraulic capacity.This pipeline is critical tothe sewer system as it crosses through the Caltrans right-of-way (ROW)for SR 78.

Additionally, nine manholes within the project vicinity have been identified to be rehabilitated (manholes B03174-BO3182 and B04106).Seven are located south of SR 78, between Mimosa Avenue and Smilax Road.

Two are located in Smilax Road,just north of SR 78.The locations of these manholes are shown in Figure 3, Proposed Improvements.
1 .3 Project Description
The proposed improvements are generally comprised of the following: 1)Mimosa Avenue relief sewer that will reroute flow awayfrom the overcapacity sewer mains running between manhole B03173 and B02078, 2) Springdale Estates rehabilitation between manholes B03166 and B03168;3)evaluation of point repairs (needed to support relining of pipe or just needed in lieu of relining entire segment); 4)Caltrans right-of- waycrossing;and,5)evaluation of individual manholes to be rehabilitated.

Mimosa Avenue Sewer Realignment
A sewer main realignment is proposed within the Mimosa Avenue right-of-way; refer to Figure 3, Proposed Improvements. The proposed improvements consist of approximately 1,306 linear feet of new 12-inch diameter PVC sewer beginningat a proposed sewer manhole installed at the i ntersection of Mimosa Avenue and Smilax Road,just northerlyof manhole B03173.This will reroute flow away from the overcapacity sewer mains downstream of manhole B03173.

The majority of such improvements would be constructed via cut-and-cover trenching construction methods.Trenchless construction methods are anticipated fortwo segments due tothe presence of existing reinforced concrete box culverts and access restraints. Trenchless construction methods may include pipejacking and/or pipe ramming. Construction activities would be subject to District standards for the protection of stormwater and implementation of a water quality management plan prepared and implemented by qualified stormwater professional in compliance with the requirements of the National Pollution Discharge Elimination System (NPDES) General Construction Permit. Best management practices for the protection of stormwater are anticipated to include the installation of gravel bags around storm drain inlets and the covering of any stockpiles to achieve erosion and sedimentation control.Such practiceswould be implemented by the construction contractor as part of the right-of-way permit issued for the proposed improvements. The water quality management plan will be subject to review and approval by the City of Vista Engineer prior to the commencement of work.

Additionally, maintenance improvements are proposed to ensure that facilities continue to function properly and that adequate service can be provided to District customers.These improvements are as follows:

Springdale Estates
Four locations between the two pipelines between manholes B03166 and B03168 that are experiencing infiltration and mineral deposits and therefore require trenchless repairs.The existing lining between the manholes is structurally intact for much of the pipeline. Removing the existing liner to install a new liner would not provide a significant benefit.To avoid excessive damage to the existing liner,the mineral deposits surrounding points of infiltration will be removed using a high-pressure water sprayer. Chemical grout injection will be used to repair the infiltration points,and liner point repairs are proposed to repa it da mage to the existing liner.
3 03/08/2022 C7 15 of 159

Smilax-Mimosa Sewer Improvements Project
Coral Tree Manor
The pipeline segment between B03172 and B03171 is exhibiting circumferential cracking inseveral locations and would be relined. There are two laterals along this portion of the pipeline that would be reconnected after the liner is installed.There are also two locations exhibiting large cracks that will require an open cut repa ir to enha nce the integrity of the host pipe prior to relining.

The pipeline segment between B03171 and B03170 is experiencing external infiltration approximately midway along the pipe segment and multiple cracks are present in the pipe just upstream from manhole B03171. This entire segment will be relined. Additionally, there are four service laterals that will be reconnected after the liner is installed. There are also encrusted deposits along this pipeline segment that will be removed during the cleaning process, prior to the liner insertion.

Caltrans Crossing
The existing 8-inch vitrified clay pipeline (VCP)is generally structurally intact and in good condition, but has experienced debris buildup and a possible sag may occur approximately490 feet downstream of manhole B03172.A proposed manhole will be installed approximately 355 feet downstream of manhole B03172. No action is needed for the sewer main between manhole B03172 and the proposed manhole.The sewer main between the proposed manhole and the lateral connection at 460 feet downstream of manhole B03172, approximately90feet of existing sewer line will be abandoned.

The existing sewer lateral for the house at 366 Smilax Road will remain connected to the existing s ewer main,and therefore,the section of pipeline between the lateral and manhole B03173 will remain in service.

A proposed manhole will be constructed directly upstream of this lateral, and the pipeline between the lateral and manhole B03173 will be cleaned and rehabilitated with cured-in-place-pipe (CIPP) lining.

Additionally, manhole B03172 and manhole 3114 in Smilax Road will be rehabilitated. A size increase to accommodate future flows is not required for this sewer main.

Manhole Rehabilitation
Existing manholes in the reach that include the B03174-BO3182 alignment,south of Mimosa Avenue and east of Smilax Road,and B04106 in Mimosa Avenue,are recommended for rehabilitation.The rehabilitation would consist of two parts: 1)sandblasting and relining the interior of the manholes,and 2) replacing the existing frame and covers with three-foot diameter frames and covers. The lining would consist of application of 100%solids, high build epoxy. The replacement of the frame and covers would also include removal and replacement ofthe cone sections of the manhole to accommodate the larger manhole covers.

In orderto perform this work,the top section of the manholes would be excavated,and the cone sections removed; this will entail additional pavement removal and replacement for those manholes that are currently in paved areas.

Site Access
Short-Term Construction Access and Staging
Generally, the areas where improvements are proposed are located within existing public easements or roadway rights-of-way and would therefore be easily accessed.Access may be more restricted within improvement areas located within easements or on privately owned property. Outreach to the residents and property owners of the Coral Tree Manor complex and Springdale Estates would be required to coordinate accesstothe affected pipelines orother infrastructure requiring rehabilitation adjacent tothese developments.Coordination may include processing blanket easements and/or temporary right ofentryto enable the proposed maintenance activities.

Construction staging areas would be temporarily located within existing public utility easements or roadway rights-of-way and not on private lands.Construction staging would occur along the affected alignments to 4 03/08/2022 C7 16 of 159

Smilax-Mimosa Sewer Improvements Project
allow for ready access to construction equipment and materials in proximity to areas where active construction is undertaken. Equipment and materials would be removed once construction is completed.

Long-Term Operations and Maintenance Access
Access to the infrastructure facilities for ongoing maintenance purposes would occur similar to that as for the construction phase.Access would continue to be provided via existing public utility easements and/or roadway rights-of-way,with permissions granted forfacilities located on private properties on an as-needed basis.

Lighting
Construction would occur during typical daytime hours (generally 7:00 a.m.to 7:00 p.m. Monday through Saturday) consistent with applicable agency regulations pertaining to allowable hours of construction.

However, limited nighttime lighting may be required for temporary construction occurring during nighttime hours to avoid or minimize service disruptions.Any nighttime lighting would be temporary,and would be shielded and directed downward to reduce potential adverse lighting effects on surrounding land uses.As the proposed improvements would occur underground, no permanent nighttime lightingwould be installed for access or maintenance purposes.

Construction
Site Earthwork and Excavation
Site preparation and construction would occur in accordance with accepted construction standards and requirements. Pipe trenching and export of approximately 193 cubic yards of deleterious material and of similar quantities of pipe bedding material is anticipated. Based on inspection,a similar qua ntityof material may need to be exported and more favorable material imported for trench backfill.

It is anticipated that excavation associated with the proposed improvements would extend to a maximum of approximately 18 feet below ground surface. Such excavations would require use of a concrete saw to remove the existing pavement and allow for access to the affected pipelines. Following completion of construction,all ground surface areas disturbed bythe proposed improvements would be returned totheir prior condition.

Schedule
Project construction activities generally fall into three main categories: (1) site preparation, (2) repair and/or installation, and (3) cleanup. Construction of the proposed improvements is anticipated to be completed over a period of approximately 5 months.

Construction would primarily occur during daylight hours,generally Mondaythrough Friday, between 7:00 a.m.and 7:00 p.m.,as required to meet the construction schedule,and consistentwith restrictions set forth in the Cityof Vista Noise Ordinance(Municipal Code,Chapter8.32, Noise Control);San Diego County Code Sections 36.408 and 36.409, Construction Equipment; and City of San Marcos Noise Ordinance (Municipal Code, Chapter 10.25, Noise), as applicable. However, it is anticipated that some nighttime work would be required in order to minimize disruption of sewer service to surrounding residents(i.e.,in proximityto Coral Tree Manor and Springdale Estates Mobile Home Park)during peak demand hours.Such nighttime work is expected to require potential temporary shut-off of service. Construction work performed outside of the normal work schedule would be coordinated with other affected agencies as appropriate and would conform to applicable public notification requirements to ensure that affected residents are aware of and can plan for any temporary disruption in service.

Operations and Maintenance
Typical ongoing operations and maintenance activities over the long-termwould be the responsibility of the District and would include, but may not be limited to,routine monitoring,documentation,and reporting of equipment conditions and maintenance needs; routine maintenance; and, repair on an as-needed or 5 03/08/2022 C7 17 of 159

Smilax-Mimosa Sewer Improvements Project
emergency basis. It is anticipated that any ongoing monitoring and maintenance would require a minimal number of staff. Additional staff may be required for intermittent repair or replacement purposes, depending upon the nature of the work to be performed.

Anticipated Permits
A construction phase Water Quality Control Plan will be implemented in accordance with the City of Vista watershed and jurisdictional plan, Vista Municipal Code, Chapter 13.18, Stormwater Management and Discharge Control Program.This will be coordinated with the County of San Diegoand CityofSan Marcos to ensure compliance with the required right-of-way permit. If dewatering is required, it is anticipated to be discharged into the Buena Sanitation sewer system. Dewatering would not be applicable if the proposed improvements are not extended near/below the groundwater level. The need for dewatering during construction,if applicable,would be identified during the pending geotechnical investigation.A Special Use Discharge Permit would be required from the Encina Wastewater District should groundwater be encountered or identified.

Additionally, coordination with potentially affected utility companies (electrical, cable, etc.) would be required to avoid potential conflicts.
6 03/08/2022 C7 18 of 159

Murrieta
74 RiversideProjCounty 2w
San Clc.cnte 'Pb
IF
Escondido 'A It
tv ect,adsbad San MarcosF{ + r
Ar
Beach p
Solana
Dell Mar an t
Santee 0
7 , ,
, l S,by t 4y}��♦Fl
6 6E Cal
each'- Mexico
i d� r P~
Propose °�,� -���. �:�--� _ f� � � • :r Y a w - .Nk
R r
Project
'Location
_ ti46 at ' #
I#�� �
%
4r joy.
ab
IL
71 r
Michel ��iker
•
1 1 : 1 • • •

_ �pR
�6$8fi5 p4 EIC3t�':
�� HG�I0i4,ip-dr' 'f�Q
T
=.R4C4 r 7
•� � ,
AV
Dii
CO
Y
,tiS} °4YCINOANISL4�try. sv _ IYFf�' J LEGENO Y.
:'.. Buena SanIkai0cn DiWck
^ rsitpry Sewer Cp3itipTt SySken1
r UP eorld+i►on ImproverneMs NeaT Term 0 Feel 1.000

SMILAX-MIMOSA SEWER IMPROVEMENTS PROJECT
IN I E RNA TFI'DN A Q Mimosa Avenue Improvements Identified in CSMP File.181869Figures.indd Source:City of Vista 2017 CSMP Supplemental Program EIR(Figure 3-17) Figure 2 03/08/2022 C7 20 of 159

t
�. M7Ow MH N0 3 401
MHIN0:11) 4k IRK �►
• ! MH NED
04 O MH
MH 4105
r. # j � t • A
L
�• MH 31742 •�
' Q" 1 8 ? \`�MH N0:6r� MHj31;0AV
"11 1
MH 2O78 O " 4 •
— • �iMH 3176 MH'3369 'r ■
• MH p-L zI
j MH 3383 0 rO MH 3174 a�O,�Nx H �� ! � _ �- MH 3482 MH 3181 .MH 3173 ,f MH 368
MH 3094
4 F �4744,
� is
Proposed MH
Proposed MH Rehab
Proposed Open Cut
1 •+ 1 - R r •
y • InternalPipe
MH Access in Cleared Easem
r f � �� •/ rQe0 • ■ `
Existing Sewer Alignment
•y � j .}
Michael Baker • • • • • •
•
1 1 : 1 • •

IL _
S �.
411
J.

MH3178 4 ` y. \
MHj3170
MH2O78 �_ �� + �* • y + H3176 MH3169-
3174 MH NO`7 '.� f
MH N( 8
• ,..ryrye� i�r L �
�¢� MH 318� � � � � .�3173 ` MH 31 8 � � � r • \� H 31182 O, .�: /
• r
i�� - •�• •�� �• � �MH3167T '� •.. • , � MH 3094 t.

Y r
4t. Proposed MH Rehab
W.

INS
Proposed Open Cut
Internal Pipe Rehab
MH Access in Cleared Easement
Existing Sewer Alignment
s
Michael Baker
1 1 : 1 • •

Smilax-Mimosa Sewer Improvements Project
1 .4 Purpose of this Addendum
and Basis for Decision to Prepare Addendum
CEQA Guidelines Sections 15162 through 15164 set forth the criteria for determining the appropriate additional environmental documentation,ifany,to be completed when there is a previously adopted Notice of Determination for a previously certified EIRfora project.

The previous 2008 SMPU PEIR and 2017 CSMP SPEIR referenced above comply with CEQA Guidelines §15168(a),which requiresthat a programmatic environmental document be prepared fora series of actions that can be characterized as one large program, with each action related as logical parts in the chain of contemplated actions.Typically,such a programcan involve individual activities/projects carried out under the same authorizing statutory or regulatory authority and having generally similar environmental effects which can be mitigated in similar ways(§15168[a][4]).PEI Rs generally analyze broad environmental effects of the program acknowledging that site-specific environmental reviews may be required for subsequent implementing activities/projects. When a subsequent project within the program is proposed for implementation, it must undergo additional CEQA review(§15168[c])to confirm whether it would result in any new significant environmental effects or increase the severity of any previously identified environmental effects.CEQA Guidelines§15162-15164 provide the circumstances under which a subsequent project that has been evaluated in a previously certified PEIR may warrant a subsequent EIR or Mitigated Negative Declaration (MND), a supplement to an EIR or MND, or an Addendum to an EIR or MND, based on the significance or severityof new or increased environmental impacts that could result from project changes, new information,changing circumstances,orchangesto mitigation measures or alternatives.If determined that a subsequent project would not have any new or greater significant environmental effects than what was concluded for that project in a PEIR, then a subsequent or supplemental EIR or MND is not required, and the Lead Agency may relyon a CEQAAddendum to approve the subsequent project(§15164[a]and[b]).

For CIP#8301,the currently proposed project is different from its counterparts as described and evaluated in the 2017 CSMP PPEIR. The analysis in this Addendum is based on current detailed design plans for CIP #8301 involving a new pipeline alignment and associated improvements; referto Figure 2.

Pursuant to CEQA Guidelines §15164(e), the analysis provided herein is intended to evaluate whether a change in circumstances hasoccurred,orwhether new information available forthe project since the time of certification ofthe 2017 CSMP SPEI R triggers the need to prepare a subsequent EIR or MND,to provide justification for the preparation and use of this Addendum. Pursuant to CEQA Guidelines §15164(d), this Addendum is intended to inform the District's consideration and action on the project. District approval of this Addendum requires concurrence by the City of Vista's Community Development Director that all procedures required bythe District were followed. Pursuant to CEQA Guidelines§15164(c),this Addendum need not be circulated for public review.

The project could potentially result in one or more of the following environmental effects.As appropriate, mitigation measures identified in the 2017 SPEIR EIR would be implemented to reduce potential environmental effects resultingwith the proposed improvements to a level of less than significant.Referto the evaluations provided in Section 2.0, Environmental Initial Study Checklist, below, for additional discussion.
❑ Aesthetics ❑ Agriculture/Forestry Resources ❑ Air Quality ■ Biological Resources ■ Cultural Resources ❑ Geology/Soils ❑ Greenhouse Gas Emissions ■ Hazards/Hazardous Materials ❑ Hydrology/Water Quality ❑ Land Use/Planning ❑ Mineral Resources ■ Noise ❑ Population/Housing ❑ Public Services ❑ Recreation ■ Transportation/Traffic ❑ Utilities/Service Systems ■ Mandatory Findings of Significance
11 03/08/2022 C7 23 of 159

Smilax-Mimosa Sewer Improvements Project
1 .5 Determination
On the basis of this initial evaluation
• 1 find that the proposed project WOULD NOT have any significant effects on the environment that either have not already been analyzed in the prior SPEIR or that are more significant than previously analyzed. Pursuant to CEQA Guidelines Section 15168(c}, CEQA does not apply to such effects. A Notice of Determination (Section 15094) will be filed.

O 1 find that the proposed project will have effects that either have not been analyzed in the prior SPEIR or are more significant than described in the prior SPEIR.With respect to those effects that are subject to CEQA, I find that such effects WOULD NOT be significant and a NEGATIVE DECLARATION will be prepared.

O 1 find that the proposed project will have effects that either have not been analyzed in the prior SPEIR or are more significant than described inthe prior SPEIR. Ifind that although those effects could be significant, there will not be a significant effect in this case because revisions in the project have been made by or agreed to by the project proponent. A MITIGATE NEGATIVE DECLARATION will be prepared.

O 1 find that the proposed project would have effects that either have not been analyzed in a prior SPEIR or are more significant than described in the prior SPEIR. Ifind that those effects WOULD be significant,and an ENVIRONMENTAL IMPACT REPORT is required to analyze those effects that are subject to CEQA.

Signature Date
For
12 03/08/2022 C7 24 of 159

Smilax-Mimosa Sewer Improvements Project
1 .6 Evaluation of Environmental Impacts

1. A brief explanation is required for all answers except "No Impact" answers that are adequately supported bythe information sources a lead agency cites in the parentheses following each question.

A"No Impact"answer is adequately supported if the referenced information sources showthat the impact simply does not apply to projects like the one involved (e.g., the project falls outside a fault rupture zone).A"No Impact"answer should be explained where it is based on project-specific factors as well as general standards(e.g.,the project will not expose sensitive receptors to pollutants,based on a project-specific screening analysis).

2. All answers must take account of the whole action involved, including off-site as well as on-site, cumulative as well as project-level, indirect as well as direct, and construction as well as operational impacts.

3. For the purposes of this checklist,"prior SPEI R"means the environmental impact report certified for the 2017 CSMP.

4. Once the lead agency has determined that a particular physical impact may occur as a result of an improvement contemplated under the CSMP, then the checklist must indicate whether that impact has already been analyzed inthe prior SPEIR or whetherthe new significant impact is due to unusual circumstances or substantial new information,as indicated inthe column headings. Iftheeffect of the project is not more significant than what has already been analyzed,that effect of the project is not subject to CEQA. The brief explanation accompanying this determination should include page and section references tothe portions of the prior SPEIR containingthe analysis ofthat effect.The brief explanation shall also indicate whether the prior SPEIR included any mitigation measures to substantially lessen that effectand whether those measures have been incorporated into the project.

5. If all effects of an improvement contemplated under CSMP were analyzed in the prior SPEIR, CEQA does not apply to the project,and the lead agencyshall file a Notice of Determination.

6. Effects of an improvement contemplated under CSMP that has not been analyzed in a prior EIR are subject to CEQA.With respect to those effects of individua I improvements contemplated under CSMP that are subject to CEQA,the checklist shall indicate whether impacts have been previously analyzed in the SPEIR, new significant impacts due to unusual circumstances or substantial new information, less than significant impact with SPEIR mitigation measures applied, less than significant impact,or no impact Ifthere are one or more "Significant Impact"entrieswhen the determination is made,an EIR is required. The EIR should be limited to analysis of those effects determined to be significant. (Section 15128).

7. "SPEIR Mitigation Measure(s)Applicable" applies where the incorporation of mitigation measures from the SPEIR will reduce an effect of project that is subject to CEQAfrom"Significant Impact"to a "Less than Significant Impact."The lead agency must describe the SPEIR mitigation measures, and briefly explain how those measures reduce the effect to a less than significant level.

8. The explanation of each issue should identify:
a. the significance criteria or threshold,if any, used to evaluate each question;and b. the mitigation measure identified, if any,to reduce the impact to less than significance. 13 03/08/2022 C7 25 of 159

Smilax-Mimosa Sewer Improvements Project

2.0 ENVIRONMENTAL INITIAL STUDY CHECKLIST
I. AESTHETICS
New
Significant
Impact due
to Unusual
Circum- No Impact
Impact stances or or Less SPEIR New
Analyzed Substantial than Mitigation Mitigation in the New Significant Measure(s) Measure(s)
Would the project: SPEIR Information Impact Applicable Required a) Have a substantial adverse effect on a
scenic vista? ❑ ❑ 0 ❑ ❑
b) Substantially damage scenic
resources, including,but not limited
to,trees,rock outcroppings,and ❑ ❑ ■ ❑ ❑ historic buildings within a state
scenic highway?
c) Substantiallydegradethe
existingvisual characteror ❑ ❑ 0 ❑ ❑ quality of the site and its
surroundings?
d) Create a new source of substantial
light or glare which would ❑ ❑ 0 ❑ ❑ adversely affect day or nighttime
views in the area?
a) Have a substantial adverse effect on a scenic vista? No Impact. Temporary construction activities would be visible at the time when the proposed improvements are being undertaken,with a limited number of construction-related vehicles and equipment being present within the areas where improvements would occur; however, once completed, such improvements would be underground and would not be discernible within the affected area. The City of Vista General Plan 2030 does not identify any designated scenic vistas on lands affected by the projector within the project vicinity. Additionally, no designated scenic vistas are identified in either the County of San Diego General Plan (County of San Diego 2011) or the City of San Marcos General Plan (City of San Marcos 2012)as being in the project vicinity.

Due to such conditions, the project would not have a substantial adverse effect on such resources. No impact would occur in this regard.
b) Substantially damage scenic resources,including, but not limited to, trees, rock outcroppings, and historic buildings within a state scenic highway?
No Impact.The project improvements are located just to the south and north of State Route(SR) 78;refer to Figure 3, Proposed Improvements.SR 78 is not identified as an officially designated as a scenic highway by the California Department of Transportation (Caltrans) (Caltrans 2018). No other scenic highways are located within proximity to the project area. As such, the proposed project would not damage scenic resources within a statescenic highway.No impact would occur in this regard. 14 03/08/2022 C7 26 of 159

Smilax-Mimosa Sewer Improvements Project
c) Substantially degrade the existing visual character or quality of the site and its surroundings? Less than Significant Impact.The project area is highly urbanized and built out and does not support features or elements having high scenic value or character.Some temporary disturbance would be visible during construction, but would be limited to the area in proximity to the proposed improvements. All equipment and vehicles would be removed once the improvements are completed. Such temporary disturbance is therefore not anticipated to substantially degradethe existing visual character or quality of the site and its surroundings.Additionally,theproject proposes improvements to an existing sewer pipeline and laterals,as well as a number of manholes;such elements would be located below ground surface and would not be visible once construction is completed. Impacts relative tothis issue are considered to be less than significant.
d) Create anew source of substantiallight or glare that would adversely affect day or nighttime views in the area?
Less than Significant Impact. Some nighttime construction may be required to minimize potential service disruption to area residential uses (i.e., residents of Vista Meadows Mobile Home Community). As such, nighttime lighting may be utilized in proximity to the affected areas and would be limited to that required to ensure worker safety and visibility.It is anticipated thatsuch construction activitywould be limited to two to three nights. Such activities would be subject to conformance with applicable nighttime construction lighting requirements and approval bythe affected jurisdiction.All nighttime lighting would be localized and limited to that needed for safety and adequate access. All such lighting would be shielded and directed downward to avoid the potential for light trespass or spillover onto adjacent properties. Any nighttime lighting used would be removed from the affected areas upon the completion of construction.

Upon completion of the proposed improvements, all project-associated improvements would be below ground, and therefore, would not require illumination or incorporate elements with the potential for adverse glare effects.Therefore,impactswould be less than significant in regard tothis issue.

II. AGRICULTURE AND FORESTRY RESOURCES
New Significant
Impact due to
Unusual No Impact
Impact Circumstances or Less SPEIR New Analyzed or Substantial than Mitigation Mitigation in the New Significant Measure(s) Measure(s) Would the project: SPEIR Information Impact Applicable Required a) Convert Prime Farmland,
Unique Farmland,or
Farmland of Statewide
Importance(Farmland),as
shown on the maps prepared ❑ ❑ 0 ❑ ❑
pursuanttothe Farmland
Mapping and Monitoring
Program of the California
Resources Agency,to non-
agricultural use?
b) Conflictwithexistingzoning
for agricultural use, or a ❑ ❑ 0 ❑ ❑
Williamson Actcontract?
15 03/08/2022 C7 27 of 159

Smilax-Mimosa Sewer Improvements Project
c) Conflict with existingzoning
for,or cause rezoning of,
forest land(as defined in
Public Resources Code
section 12220(g)),
timberland (as defined by
Public Resources Code ❑ ❑ 0 ❑ ❑
section 4526),or
timberland zoned
Timberland Production(as
defined by Government
Code section 51104(g))?
d) Result in the loss of forest
land or conversion of forest ❑ ❑ 0 ❑ ❑
land to non-forest use?
e) Involve other changes in the
existing environment which,
due to their location or
nature,could result in ❑ ❑ 0 ❑ ❑
conversion of Farmland, to
non-agricultural use or
conversion of forest land to
non-forest use?
a) Convert Prime Farmland, Unique Farmland, or Farmland of Statewide Importance (Farmland), as shown on the maps prepared pursuant to the Farmland Mapping and Monitoring Program of the California Resources Agency,to non-agricultural use?
No Impact.The proposed project site is located in a highly urbanized area within the County of San Diego andtheCityofSan Marcos.Surrounding land usesgenerallyincludesingle-and multi-family residential uses.

The lands affected by the improvements are currently disturbed and/or developed, with the majority of lands currently surfaced with as pha Itic pavement;refer to Figure 3, Proposed Improvements.

No lands affected by the proposed project support agricultural resources or lands designated as Prime Farmland, Unique Farmland,or Farmland of Statewide or Local Importance asshown onthe maps prepared pursuant to the Farmland Mapping and Monitoring Program; rather, all affected lands are designated as Urban and Built-Up Land,which are lands "occupied by structures with a building density of at least 1 unit to 1.5 acres, or approximately 6 structures to a 10-acre parcel. Common examples include residential, industrial, commercial, institutional facilities, cemeteries, airports, golf courses,sanitary landfills, sewage treatment, and water control structures" (CDC 2018). Therefore, the project would not convert any designated Farmland to a non-agricultural use.No impact would occur relative tothis issue. b) Conflict with existing zoning for agricultural use,or a Williamson Act contract? No Impact.Refer to Response 11(a),above.As the proposed improvements along Mimosa Avenue are within the roadway right-of-way, the land is not zoned; properties surrounding the areas where improvements would occur are generally zoned for single-family and multi-family residential use and are not intendedfor agricultural use purposes. Additionally, none of the affected lands are under a Williamson Act Contract.

Therefore, the project would not conflict with existing zoning for agricultural use, or a Williamson Act Contract. No impact would occur.
16 03/08/2022 C7 28 of 159

Smilax-Mimosa Sewer Improvements Project
c) Conflict with existing zoning for, or cause rezoning of,forest land(as defined in Public Resources Code section 12220(g)), timberland (as defined by Public Resources Code section 4526), or timberland zoned Timberland Production(as defined by Government Code section 51104(g))? No Impact. Refer to Response I I(a),above.The project site does not conta i n forest lands ortimberland.The County of San Diego does not have any existing Timberland Production Zones. Therefore, project implementation would not conflict with existing zoning for,or cause rezoning of, forestland,timberland,or timberland production zones. No impact would occur.
d) Result in the loss of forest land or conversion of forest land to non forest use? No Impact. Refer to Response II(a), above.The project site does not contain any forestlands as defined in Public Resources Code Section 12220(g);therefore, project implementation would not result in the loss or conversion of forestland to a non-forest use. I n addition,the project is not located in the vicinity of off-site forest resources. No impact would occur.
e) Involve other changes in the existing environment which,due to their location or nature,could result in conversion of Farmland, to non-agricultural use or conversion of forest land to non forest use? No Impact.Refer to Response II(a),above.The project site and surrounding area within a radiusofa quarter mile do not contain any active agricultural operations or lands designated as Prime Farmland, Unique Farmland, or Farmland of Statewide or Local Importance as shown on the maps prepared pursuant to the Farmland Mapping and Monitoring Program(CDC2018).Nodes ignated forest land occurswithinthe project area. Therefore,the proposed project would not involve changes in the existing environment that would result in conversion of farmland to nonagricultural use or conversion of forestland to non-forest use.

Therefore, no impact would occur relative to this issue.

III. AIR QUALITY
New
Significant
Impact due
Where available,the significance criteria to Unusual established by the applicable air quality Circum- No Impact Impact stances or or Less SPEIR New
management orair pollution control district Analyzed Substantial than Mitigation Mitigation may be relied upon to make the following in the New Significant Measure(s) Measure(s) determinations.Wouldthe project: SPEIR Information Impact Applicable Required a) Conflictwith or obstruct 0 ❑ 0 ❑ ❑ implementation of the applicable air
quality plan?
b) Violate any air qualitystandard or 0 ❑ 0 ❑ ❑ contribute substantially to an
existing or projected air quality
violation?
c) Result in a cumulatively considerable ❑ ❑ 0 ❑ ❑ net increase of any criteria pollutant
for which the project region is non-
attainment under an applicable
federal or state ambient air quality
standard(including releasing
emissions which exceed quantitative
thresholds for ozone precursors)?
17 03/08/2022 C7 29 of 159

Smilax-Mimosa Sewer Improvements Project
d) Expose sensitive receptors to ❑ ❑
substantial pollutant
concentrations?
e) Create objectionable odors 0 ❑ ❑ affecting substantial
number of people?
a) Conflict with or obstruct implementation of the applicable air quality plan? Less than Significant Impact.

Direct Effects-Construction and Operations:The area affected bythe proposed improvements is located within the San Diego Air Basin(SDAB).The San Diego Air Pollution Control District(SDAPCD)implements the County of San Diego's portion of the State Implementation Plan(SIP)which identifies guidance to be applied as part of the Regional Air Quality Strategy(RAQS)to achieve acceptable air quality. A significant impact would occur if a project would result in a conflict with or obstruct implementation of the San Diego County RAQS or the SIP.

As analyzed in the 2017 CSMP SPEIR, construction emissions from CSMP projects are not anticipated to exceed the SDAPCD thresholds or obstruct implementation of the RAQS for the SDAB. Projects that are consistent with existing General Plan documents, used to develop air emissions budgets for air quality planning and attainment,would be considered consistent with the RAQS and the SIP.To be consistent with the existing General Plan, a project must propose the same or less development as accounted for in the General Plan. If General Plan consistency is demonstrated, the project would be in compliance with applicable rules and regulations adopted by the SDAPCD through its air quality planning process, and a conflict would not occur.

The 2017 CSMPwas determinedto be consistent withthe General Plans for the Cities of Vista,Oceanside, Carlsbad,and San Marcosaswell asthe San Diego County General Plan and North County Metro Subregional Plan.The latest SANDAG growth forecasts were used to develop assumptions regarding future growth and associated sewer infrastructure needs in the affected area. Asa result,the 2017 CSMP was determined to be in compliance with applicable rules and regulations adopted bythe SDAPCD,and would not conflict with or obstruct implementation of the RAQS or SIP. Consequently, projects identified in the 2017 CSMP would be consistent with applicable air quality plans.

The proposed improvements would not result in changes to the City's or County's General Plan land use designations, nor would they generate unplanned area population growth. Impacts would be less than significant inthis regard.

Indirect Effects:The proposed improvements would enhance the existing sewer infrastructure system to ensure that the District can provide adequate reliable service to its customers and reduce the potential for system failure or emergency maintenance.Such improvements would not indirectly generate new area population growth or serve unplanned growth. No indirect impacts would occur. b) Violate any air quality standard or contribute substantially to an existing or projected air quality violation?
Less than Significant Impact.

The SDAPCD establishes daily significance thresholds for the certain criteria air pollutants including carbon monoxide (CO), nitrogen oxides (NOx), reactive organic gases (ROG), sulfur dioxide (SOA respirable particulate matter with an aerodynamic diameter of 10 microns or less (PMlo), and respirable particulate matter with anaerodynamicdia meter of2.5 microns or less(PM 2.5).A significant impact on air qua litywould 18 03/08/2022 C7 30 of 159

Smilax-Mimosa Sewer Improvements Project
occur if a project exceeded the significance thresholds and resulted in violations of air quality standards and/or substantial contributions to existingor anticipated air quality violations.

Direct Effects—Construction: Construction of the proposed infrastructure improvements would result in short-term emissions thatwould include fugitive dustfrom ground disturbance activities and from operation of construction equipment and vehicles (i.e., ROG, NOx, CO, S02). The proposed improvements would require limited ground disturbance.Standard SDAPCDdust control practiceswould be implemented during the construction phase.Additionally, exhaust emissions from construction equipment and vehicles would vary depending on the type and intensity of the construction activity. Construction of the proposed improvements is anticipated totake approximately5 months and would therefore be relatively short-term in nature.

The 2008 SMPU PEI R evaluated a conservative construction scenario which considered a scenario in which all near-term capacity-related improvements, upto 11,781 feet of pipeline installation,would occur within the period of one year. Under such a scenario,it was concluded that resulting emissions would not exceed applicable thresholds. Such findings were incorporated into the 2017 CSMP SPEIR. As the proposed improvements would be reduced as compared to the whole of CIP projects evaluated in the 2008 SMPU PEI R,emissions from construction of the proposed improvements would not be expected to exceed SDAPCD daily significance thresholds.

Construction of the proposed improvements would not exceed an air quality standard or contribute substantiallyto an existing or projected air quality violation. Impacts would be less than significant.

Direct Effects-Operations: Ongoing maintenance activities associated with the proposed improvements would require a limited number of worker vehicle trips for purposes of inspection on a routine basis. The 2017 CSMP SPEIR considered an operations scenario which included potential air pollutant emissions associated with 15 maintenance workers, or 30 daily trips for CIP projects. It was determined that operational emissions underthis scenario would be less than SDAPCDthresholds.Based on the limited scope of the proposed sewer infrastructure improvements,it is anticipated that associated maintenance activities would involve fewerthan 15workers on a routine basis.Operational emissions associated with the proposed improvements are therefore anticipated to be belowthe adopted thresholds.A less than significant impact would result.

Indirect Effects: Due to the nature of the proposed improvements, the indirect generation of criteria pollutant emissions would not result.The improvements would not spur new area population growth or a change in land use that would generate air pollutant emissions. No indirect impacts would occur. c) Result in a cumulatively considerable net increase of any criteria pollutant for which the project region is in non-attainment under an applicable federal or state ambient air quality standard (including releasing emissions that exceed quantitative thresholds for ozone precursors)? Less than Significant Impact.

Direct Effects-Construction: The SDAB is designated as nonattainment for the federal standard for ozone and the state standards for ozone, PM1o, and PM2.s. Significant cumulative air quality impacts may result from emissions of the ozone precursors volatile organic compounds (VOCs) and NOx, as well as PM10 and PM2.5.Cumulatively considerable net increases may occur if two or more projects located within proximity would be constructed simultaneously,or if emissions generated by construction of a project exceed adopted thresholds for VOC, NOx, PMso,or PM2.5.

As the land area affected by the proposed improvements is limited,it is not anticipated that construction activities would occur adjacent to and at the same time as another construction project. In addition, construction criteria pollutant emissions generated bythe proposed improvements would be below SDAPCD thresholds; refer to Response I II(B),above.As a result, construction of the proposed improvements is not considered to contribute to a potential cumulative airquality impact. Impacts would be less than significant. 19 03/08/2022 C7 31 of 159

Smilax-Mimosa Sewer Improvements Project
Direct Effects-Operations:Limited emissions would be generated by routine maintenance of the proposed improvements. Based on the discussion under Response 1II(b)above,cumulative air quality impacts resulting from operations would therefore be less than significant.

Indirect Effects:The proposed improvements are intended to enhance and maintain the District's sewer infrastructure system and would not result in the generation of new area population growth that could generate air pollutant emissions that would contribute to a cumulatively considerable impact. No indirect impacts would occur in this regard.
d) Expose sensitive receptors to substantial pollutant concentrations? Less than Significant Impact.

Direct Effects-Construction and Operations:Sensitive receptors are defined as facilities or land uses that include members of the population that are particularly sensitive to the effects of air pollutants, such as children, the elderly, and people with illnesses. Examples of these sensitive receptors are residences, schools, hospitals,and daycare centers.CARB has identified the following groups of individuals as the most likely to be affected by air pollution: the elderly over 65, children under 14, athletes, and persons with cardiovascular and chronic respiratory diseases such as asthma, emphysema, and bronchitis. Sensitive receptors in the vicinity of the proposed improvements are existing single-and multi-family residences located along Mimosa Avenue, Smilax Road, and other affected alignments where such uses are present (Coral Tree Manor and Springdale Estates mobile home park).

As identified in the 2017 CSMP PSEI R,air emissions that could result from both construction and operation of projects identified in the 2017 CSMP would be below significance thresholds. Furthermore,the existing sewerfacilities do not generate substantial sources of toxic air contaminant(TAC)emissions that could pose or contribute to a health risk. Additionally, the construction period would be temporary and short-term.

Potential impacts related tosubstantial pollutant concentrations are considered lessthan significant.

Indirect Effects: Due to the nature of the proposed improvements (underground), the proposed improvements would not generate pollutants and would therefore not indirectly result in the exposure of sensitive receptors to substantial pollutant concentrations. I mpacts would be less than significant. e) Create objectionable odors affecting a substantial number of people? Less than Significant Impact.

Direct Effects-Construction: Potential odors generated during construction of the proposed improvement may include use of asphalt during repaving activities and/or emissions from diesel engines (i.e., from construction vehicles or equipment). As the area affected by the proposed improvements is limited, and construction would be short-term, construction activities are not anticipated to expose a substantial number of people to odors. Further,odors(i.e.,diesel exhaust)tend to dissipate within short distances. As such, impacts are considered less than significant.

Direct Effects-Operations:Objectionable odors maybe generated by the sewer system,due to its nature of collecting and transporting wastewater.The pipeline improvements proposed would not result in a new source of odors in the area. New or rehabilitated manholes would still be located in proximity to local residential(i.e.,sensitive)uses; however,SDAPCD Rule 51 prohibits emissions,including odor emissions,in such quantities of air contaminants or other material,which may result in injury, detriment, nuisance,or annoyance to public health. Impacts pertaining to operational odors would remain less than significant.

Indirect Effects: Due to the nature of the proposed improvements (underground), the project would not create objectionable odors affectinga substantial number of people. Minor odors may be generated during routine maintenance activities,but would be limited to the affected area and temporary. No impact would occur in this regard.
20 03/08/2022 C7 32 of 159

Smilax-Mimosa Sewer Improvements Project
IV. BIOLOGICAL RESOURCES
New
Significant
Impact due
to Unusual
Circum- No Impact
Impact stances or or Less SPEIR New
Analyzed Substantial than Mitigation Mitigation in the New Significant Measure(s) Measure(s) Would the project: SPEIR Information Impact Applicable Required a) Have a substantial adverse effect,either
directly or through habitat modifications,
on any species identified as a candidate,
sensitive,orspecial status species in local 0 ❑ ❑ ❑ or regional plans,policies, or regulations,
or by the California Department of Fish
and Wildlife or U.S.Fish and Wildlife
Service?
b) Have a substantial adverse effect on any
riparian habitat or other sensitive
natural community identified in local or ❑ 0 ❑ ❑ regional plans,policies, regulations,or
by the California Department of Fish and
Wildlife or US Fish and Wildlife Service?
c) Have a substantial adverseeffecton
federally protected wetlands as defined
by Section 404of the Clean WaterAct
(including,but not limited to, marsh, ■ ❑ ■ ❑ ❑ vernal pool,coastal,etc.)through direct
removal,filling,hydrological interruption,
or other means?
d) Interfere substantially with the movement
of any native resident or migratoryfish or
wildlife species or with established native ❑ 0 ❑ ❑ resident or migratory wildlife corridors,or
impede the use of native wildlife nursery
sites?
e) Conflict with any local policies or
ordinances protecting biological ❑ 0 ❑ ❑ resources,such as a tree
preservation policyor ordinance?
f) Conflictwith the provisions of an adopted
Habitat Conservation Plan,Natural
Community Conservation Plan,or other ■ ❑ ■ ❑ ❑ approved local, regional,orstate habitat
conservation plan?
a) Have a substantial adverse effect, either directly or through habitat modifications, on any species identified as a candidate, sensitive,or special status species in local or regional plans, policies or regulations,or by the California Department of Fish and Wildlife or U.S.Fish and Wildlife Service? 21 03/08/2022 C7 33 of 159

Smilax-Mimosa Sewer Improvements Project
Based upon relevant database searches conducted, 74 federal or state endangered, threatened, or candidate plant and wildlife species have been documented within the project area(CNDDB 2021;CNPS 2021); refer to Appendix A for a full list of such species,along with the current federal,state,and CDFW status of each,as applicable. Sensitive wildlife species withthe potential to occur in the area include, but are not limited to: tri-colored blackbird; coastal California gnatcatcher;California black rail; southwestern willow flycatcher; least Bell's vireo; monarch - California overwintering population; and, Quino checkerspot butterfly. Sensitive plant species with the potential to occur in the area include: San Diego button-celery; Encinitas bacccharis; Del Mar manzanita;San Diego thorn-mint; spreading navarretia;and thread-leaved brodiaea.

Although such resources may have been documented in the project area, as discussed in greater detail below, it is not anticipated that project construction or operational activities would directly or adversely affect any such species due to the highly developed (i.e., paved surface)and/or disturbed nature of lands upon which the proposed improvements would occur,combined with the absence of suitable habitat that would have the potential to support such species.

Additionally, Buena Creek,trends generally north/south in the vicinity of the project area.The creek flows under SR 78 and is identified as supporting riverine habitat(USFWS 2021).1 SPEIR Mitigation Measure Applicable.

Direct Effects - Construction: The project site is located within a highly urbanized area and is developed/disturbed in nature. As stated, project construction activities would be limited to existing roadway rights-of-way,with some general maintenance activities(manhole replacement/rehabilitation and slip lining pipeline repairs) occurring within limited portions of existing easements or privately owned property, which may support ornamental vegetation. Due to the existing disturbed/developed conditions, high-quality habitat is not present. However, limited suitable nesting habitatin the form of non-native and ornamental trees may be present in areas adjacent to the proposed improvements.As such, bird species covered under the Migratory Bird Treaty Act (MBTA) may be affected by project construction, if such activities occur during the nesting season (generally January 16 to August 31). To ensure that potential project effects on migratory species are minimized, mitigation measure B10-1 from the 2017 CSMP SPEIR would be implemented. Impactswould be reduced to less than significantwith mitigation incorporated.

Direct Effects - Operations: Any ongoing operational maintenance activities would occur in previously disturbed/developed areas where sewer infrastructure is already in place.As such, it is not anticipated that project operations would require the removal of any sensitive vegetation or habitat. Direct impacts would be less than significant inthis regard.

Indirect Effects: As the proposed improvements would be located underground, the project would not indirectly affect any known special-status species or their habitats. No impact would occur. b) Have a substantial adverse effect on any riparian habitat or other sensitive natural community identified in local or regional plans, policies or regulations, or by the California Department of Fish and Wildlife or U.S.Fish and Wildlife Service?
Less than Significant Impact.
1 Riverine includes all wetlands and deep water habitats contained within a channel,with two exceptions:(1) wetlands dominated by trees,shrubs, persistent emergents,emergent mosses,or lichens;and (2) habitats with water containing ocean-derived salts of 0.5 ppt orgreater.A channel is an open conduit either naturally or artificially created which periodically or continuously contains moving water,or which forms a connecting link between two bodies of standing water.
22 03/08/2022 C7 34 of 159

Smilax-Mimosa Sewer Improvements Project
Direct Effects—Construction and Operations:The area affected by the proposed improvements is highly urbanized and developed/disturbed. Improvements would occur within existing roadway rights-of-way or within developed residential properties; no riparian or other sensitive naturaIcommunityoccurwithin the areas that would be disturbed by the proposed improvements. Impacts would be less than significant.

Indirect Effects:The proposed improvements would be located underground. No riparian habitat or other sensitive natural commu nit ieswould be indirectly affected. Impactswould be less than significant. c) Have a substantial adverse effect on federally protected wetlands, as defined by Section 404 of the Clean Water Act(including, but not limited to, marsh, vernal pool, coastal wetlands, etc.)through direct removal,filling, hydrological interruption,or othermeans? Less than Significant Impact.

Direct Effects-Construction and Operations: The area affected by the proposed improvements is highly urbanized and developed/disturbed. Improvements would occur within existing roadway rights-of-way or within developed residential properties.

Improvements within Mimosa Avenue would occur within the roadway right-of-way and surface disturbance would be limited. The proposed improvements would not result in the disturbance of any wetland habitat. Additionally, the proposed maintenance improvements have been designed to avoid potential disturbance of any such resources through sensitive construction techniques(i.e.,limited surface disturbance and/or slip lining of affected pipelines).Therefore, project construction and operations would not adversely affect any federally protected wetlands, as defined by Section 404 of the Clean Water Act through direct removal, filling, hydrological interruption, or other means. Impacts would be less than significant.

Indirect Effects: The proposed improvements would be located underground. No indirect effects on wetlands would therefore result,and no impact would occur. d) Interfere substantially with the movement of any native resident or migratory fish or wildlife species or with established native resident or migratory wildlife corridors,or impede the use of native wildlife nursery sites?
Less than Significant Impact.

Direct Effects-Construction and Operations:The project area is highly urbanized and developed/disturbed in nature; no established wildlife corridors or nursery sites are present on lands affected by the proposed improvements.A less than significant impact would occur. Refer alsoto Response IV(a),above.

Indirect Effects:The proposed improvements would be located under the ground surface and would not affect migratory species or established migratory wildlife corridors.No indirect impacts would occur. e) Conflict with any local policies or ordinances protecting biological resources, such as a tree preservation policy or ordinance?
No Impact.

Direct Effects- Construction and Operations: The proposed improvements would occur within existing roadway rights-of-wayorwithin developed/disturbed residential properties and/or public easements. Due to the disturbed nature of the site, the project would not involve the removal of mature trees or other sensitive vegetation types. Limited removal of ornamental landscape trees and/or shrubs that are not protected under local policies or ordinances may occur to allow access; however, the removal of any sensitive or protected plant species is not required or proposed. The project would not conflict with any local policies or ordinances protecting biological resources,such as a tree preservation policyor ordinance.

No impact would occur.
23 03/08/2022 C7 35 of 159

Smilax-Mimosa Sewer Improvements Project
Indirect Effects:The proposed improvements would be constructed below the ground surface.The project would therefore not conflict with any local policies or ordinances protecting biological resources,such as a tree preservation policy or ordinance. No impact would occur. f) Conflict with the provisions of an adopted Habitat Conservation Plan, Natural Community Conservation Plan, or other approved local, regional,or state habitat conservation plan? Less than Significant Impact.

Construction and Operations: The County of San Diego's Multiple Species Conservation Program(MSCP) is a comprehensive planning process intended toaddressthe protection of multiple plant and animal species in San Diego County.The MSCP is currently being developed,and therefore, has not yet been adopted.The MSCP is a The MSCP is comprised of three separate planning areas covering unincorporated regions of San Diego. The MSCP Plans associated with each of the planning areas are the County Subarea Plan (South County Plan), North County Plan,and East County Plan, respectively. The North County Plan will extend the scope of the MSCP to contribute to the conservation of sensitive species and habitats while providing a streamlined permitting process for landowners, agricultural operators, businesses,and residents in the unincorporated regions of northwestern San Diego County.The North County Plan Area encompasses approximately345,000 acres in and around the unincorporated communities of Bonsall, De Luz, Fallbrook, Harmony Grove, Rancho Santa Fe, Lilac, Pala, Pauma Valley, Rainbow, Ramona, Rincon Springs, Twin Oaks Valley,and Valley Center within the County'sjurisdiction(CountyofSan Diegon.d.)and includes the project area.

As a joint Habitat Conservation Plan/Natural Corn mu nit iesConservation Plan(HCP/NCCP),the North County Plan will provide the basis for the County to receive a federal and state incidental take permit to"cover" specific animal and plant species. This allows the incidental take permit to be extended to future development projects that comply with the MSCP,so that such projects are not required to secure their own separate incidental take permit from the U.S. Fish and Wildlife Service and California Departmentof Fish and Wildlife.

However, as the land areas where the proposed improvements would occur are developed/disturbed and do not support sensitive biological resources,the projectwould not conflict with the provisions of the MHCP or otherapproved local, regional,or state habitat conservation plan. Impacts would be less than significant in this regard.

Indirect Effects:The proposed improvements would be constructed below the ground surface.Therefore, the project would not result in physical improvements that would conflict with the provisions of the County's MSCP or other approved local,regional,orstate habitat conservation plan. No impactwould occur.

SPEIR Mitigation Measure(s)Applicable
2017CSMPSPEIR Mitigation Measure 1310-1:MBTA Nest Avoidance.

If construction activities occur between January 15 and September 15, a preconstruction survey(within seven days prior to construction activities)shall be conducted by a qualified biologist to determine if active nests are present within or adjacent to the area proposed for development in order to avoid the nesting activities of breeding birds/raptors. The results of the survey shall be submitted to the District (and made available to the Wildlife Agencies, upon request)prior to initiation of any construction activities.

If nesting activities within 200 feet of the proposed work area are not detected,construction activities may proceed. If nesting activities are confirmed, construction activities shall be delayed within an appropriate buffer(e.g.,300feet)from the active nest until the young birds have fledged and left the nest or until the nest is no longer active as determined by a qualified biologist based on field conditions. The results of all biological monitoring shall be submittedto the District(and made available to the Wildlife Agencies,upon request).
24 03/08/2022 C7 36 of 159

Smilax-Mimosa Sewer Improvements Project
V. CULTURAL RESOURCES
New
Significant
Impact due
to Unusual
Circum- No Impact
Impact stances or or Less SPEIR New
Analyzed Substantial than Mitigation Mitigation in the New Significant Measure(s) Measure(s) Would the project: SPEIR Information Impact Applicable Required a) Cause a substantial adverse change in
the significance of historical resource ■ ❑ ❑ ■ ❑ as defined in§15064.5?
b) Cause a substantial adverse change
in the significance of an ❑ ❑ 0 ❑ archaeological resource pursuant
to §15064.5?
c) Directly or indirectly destroy a unique
paleontological resource or site or unique ■ ❑ ❑ ■ ❑ geologic feature?
d) Disturb any human remains,
includingthose interred outside of 0 ❑ ❑ 0 ❑ formal cemeteries?
e) Cause a substantial adverse change
in the significance of Tribal 0 ❑ ❑ 0 ❑ Cultural Resourceas defined in
Public Resources Code§21074?
a) Cause a substantial adverse change in the significance of a historical resource as defined in§15064.5? SPEIR Mitigation MeasureApplicable.

Direct Effects - Construction and Operations: The proposed improvements would not result in the realignment of an existing local roadway that may have the potential to directly impact existing off-site historic resources.Any ground disturbance would occur within existing public rights-of-way,easements,or on limited private propertyand would betemporary.

No historic resources identified in the Vista General Plan 2030 Update are located within proximityto the proposed sewer infrastructure improvements (City of Vista 2011a). Similarly, according to the San Diego County General Plan Final Program EIR,no historic resourcesare located on lands affected bythe proposed sewer infrastructure improvements (CountyofSan Diego2011).

In conformance with mitigation measure CULT-2 of the 2017 CSMP SPEIR, Michael Baker International prepared a Cultural Resources Memorandum for the project(Michael Baker 2022). A records search ofthe project area and a one-quarter-mile radius was conducted at the South Coastal Information Center(SCIC) on October 11, 2021. The SCIC at San Diego State University is part of the California Historical Resources Information System,an affiliate of the California Office of Historic Preservation(OHP).The SCIC is the official state repository of cultural resources records and reports for San Diego County.

As part of the records search and other background research,the following federal and state inventories were reviewed: California Points of Historical Interest (2022); California Historical Landmarks (2022); Archaeological Determinations ofEligibilityfor San Diego County(2012);and Built Environment Resources Directory(2021) (Michael Baker 2022). The directory includes resources evaluated for listing and listed in the National Register of Historic Places(NRHP), National Historic Landmarks,California Register of Historical 25 03/08/2022 C7 37 of 159

Smilax-Mimosa Sewer Improvements Project
Resources(CRHR),California Historical Landmarks,and California Points of Historical Interest for San Diego County.

Based on the results of the searches conducted, no previously recorded cultural resources were identified within the project area. Twelve cultural resources were identified within one-quarter mile of the project area. The records search identified 23 previous cultural resources studies that have been conducted within one-quarter mile of the project area, 11 of which included portions of the project area (Michael Baker 2022).

Additionally, on October 6, 2021, Michael Baker submitted a request to the Native American Heritage Commission (NAHC) to conduct a records search of the Sacred Lands File for the project area. On November 14, 2021, the NAHC relayed the results of the Sacred Lands File search were negative for cultural resources(Michael Baker2022).

Based on the negative results of the SCIC records search and Sacred Lands search, project construction activities would not occur within 25 feet of a known NRHP or CRHR eligible or listed historic structure.

Although project construction activities would occur within 25 feet of buildings in the Coral Tree Manor apartments complex, the complex was developed in 1987 and does not require consideration for potential historical significance.Construction activities would occur within the Springdale Estates mobile home park, but not within 25 feet of any permanent structures.

Pursuant to mitigation measure CULT-2 of the 2017 CSMP SPEIR, on December 13, 2021, a letter and maps were sent to Ms. Cami Mojado of the San Luis Rey Band of Mission Indians via U.S. mail and via email to notify her of the proposed project. Ms. Mojado replied via email on December 17, 2021, stating she was having a problem opening the file and asked if Michael Baker could resend it. Michael Baker emailed the letteragain to Ms. Mojado the same day, and let her know the hard copy sent via U.S. mail was delivered on December 15, 2021, according to the delivery receipt. Michael Baker sent a follow-up email to Ms. Mojado on December 27, 2021. No response has been received to date (Michael Baker 2022 .

Based on the negative results of the SCIC records search and the Sacred Lands File search, and lack of correspondence received from the San Luis Rey Band of Mission Indians, no known or potential historical or Native American cultural resources have been identified within the project area. With conformance to the requirements identified in mitigation measure CULT-2 of the 2017 CSMP SPEIR,the project would not cause a substantial adverse change in the significance of a historical resource as defined in §15064, and potential impacts would be less than significant.

Indirect Effects: Construction activities may cause ground vibration to occur which can indirectly result in damage to adjacent structures or other physical elements. Due to the limited nature and scope of the proposed infrastructure improvements, it is not anticipated that construction methods or equipment anticipated to be used would generate substantial groundborne vibration that may adversely affect area land uses or structures. No indirect impactsto historic resources are anticipated inthis regard. b) Cause a substantial adverse change in the significance of an archaeological resource pursuant to §15064.5?
SPEIR Mitigation MeasureApplicable.

Direct Effects-Construction and Operations:Refer to Response V(a),above. In conformancewith mitigation measure CULT-2 of the 2017 CSMP SPEIR, a SCIC records search and Sacred Lands File search were conducted,and notification was sent to the San Luis Rey Band of Mission Indians.As previously described, based on the results of such efforts, no known historical or cultural resources would be adversely affected 26 03/08/2022 C7 38 of 159

Smilax-Mimosa Sewer Improvements Project
by construction and/or operation of the project as proposed. Further, as indicated in mitigation measure CULT-2,as such results were found to be negative, archaeological monitoring during project construction is not required (as described in 2017 CSMP SPEIR mitigation measure CULT-3,Archaeological Monitoring); however,the District may elect to implementsuch monitoring efforts as desired based on District standards for construction projects.

With conformance to the requirements identified in mitigation measure CULT-2 of the 2017 CSMP SPEIR, the project would not cause a substantial adverse change in the significance of an archaeological resource pursuant to§15064.5. Potential impacts would be less than significant.

Indirect Effects: Due to the nature of the project, the proposed infrastructure improvements would not induce new area growth or development that could indirectlycause ground disturbance or adversely affect archaeological resources.No indirect impacts would occur. c) Directly or indirectly destroy a unique paleontological resource or site or unique geologic feature? SPEIR Mitigation MeasureApplicable.

Direct Effects-Construction and Operations: Lands affected bythe proposed improvements are underlain by geologic deposits of the Peninsular Ranges geomorphic province. Geologic units consist of the Eocene- age Santiago Formation and Cretaceous-age Granitic Rock(Tonalite) (Geocon 2021). No unique geologic features are presenton lands affected bythe proposed improvements.

Project trenching for the proposed improvements in Mimosa Avenue is estimated to reach a maximum of approximately 18 feet.As indicated in the 2017 CSMP SPEIR,pipeline improvements,where extending to a depth of 10 feet or greater, located in areas characterized with a moderate to high sensitivity for paleontological resources have the potential to directly destroy paleontological resources during excavation activities.Therefore,mitigation measure CULT-4 as identified in the 2017 CSMP SPEIR, is required to reduce potential impacts to paleontological resources through implementation of a monitoring and reporting program.

Indirect Effects:Due tothe nature of the project,the proposed sewer infrastructure improvements would not induce new area growth that could indirectly affect unknown paleontological resources. No indirect impacts would occur.
d) Disturb any human remains,including those interred outside of formal cemeteries? SPEIR Mitigation MeasureApplicable.

Direct Effects-Construction: Referto Response V(b),above. Duetothe developed/disturbed characterof the affected area,is not anticipated that human remains would be encountered during construction of the limited infrastructure improvements proposed. However, undiscovered human remains may be encountered during limited ground disturbing activities. Implementation of mitigation measure CULT-5 of the 2017 CSMP SPEIR would be required to reduce potential impacts to human remains to less than significant.

Direct Effects-Operations:The proposed improvements would be constructed below the ground surface.

Operational maintenance activities would require limited ground disturbance and would occur at areas previously disturbed by infrastructure improvements. As such, operations are not anticipated to disturb human remains. Impactswould be less than significant.

Indirect Effects:Due to the nature of the project,the proposed improvements would not induce new area growth that could disturb areas where unknown human remains may be discovered. No indirect impacts would occur.
27 03/08/2022 C7 39 of 159

Smilax-Mimosa Sewer Improvements Project
e) Cause a substantial adverse change in the significance of a Tribal Cultural Resource as defined in Public Resources Code§21074?
SPEIR Mitigation MeasureApplicable
Direct Effects— Construction: Refer to Response V(b), above. As described above, in conformance with mitigation measure CULT-2 of the 2017 CSMP SPEIR,a SCIC records search and Sacred Lands File search were conducted, and notification was sent to the San Luis Rey Band of Mission Indians. Based on the results of such efforts, no known historical or cultural resources would be adversely affected by construction a nd/or operation of the project as proposed. With conformance to the requirements identified in mitigation measure CULT-2 of the 2017 CSMP SPEIR,the project would not cause a substantial adverse change inthe significance of any known resources,and potential impactswould be less than significant.

Direct Effects—Operations: Once operational,the proposed improvements would be below the ground surface and are not anticipated to disturb any buried tribal cultural resources.Directimpacts in this regard would be less than significant.

Indirect Effects:Due tothe nature of the project,the proposed improvements would not induce new area growth that would have the potential to adverselyaffect tribal cultural resources.No indirect impacts would occur.

SPEIR Mitigation Measures Applicable
2017 CSMP SPEI R Mitigation Measure CULT-2: Project-Specific Archaeological Survey.

Prior to the issuance of project-specific construction documents for CIP Capacity and Condition Projects (Hardscape and Cross County Environs), Pump Station Rehabilitations,and Out-of-Service Area Projects,a Qualified Archaeologist approved by the City shall contact the NAHC regarding a Sacred Lands File Search for the project area. In addition, the City shall request a written response from the San Luis Rey Band of Mission Indians(SLR Band)(a tribe traditionally and culturally affiliated with the site)regarding whether the site of the 2017 CSMP improvement project may potentially affect Native American resources. If the NAHC and/or the SLR Band confirms potential known resources,a pedestrian survey(i.e., physical walkover)shall first be conducted by the Qualified Archaeologist and a TCA(traditionally and culturally affiliated) Native American Monitor.Should the pedestrian survey identify Native American cultural resources,the Qualified Archeologist shall, in consultation with the TCA Native American monitor and the SLR Band, make an immediate written evaluation of the significance and appropriate treatment ofthe resource, including any avoidance measures, additional testing and evaluations, or data recovery plans, and Pre-Excavation Agreements withtheTribe. IftheSLR Band confirms, in consultation with the Qualified Archaeologist,that there is a potential for unknown resources to be uncovered during construction activities,then Mitigation Measure CULT-3,Archaeological Monitoring,shall be implemented. 2017CSMPSPEIR Mitigation Measure CULT-4: Paleontological Monitoring.

Monitoring during construction grading or trenching shall be required for all CIP conveyance projects (Hardscape and Cross-Country Environs)that would excavate to a depth of ten feet or more. Prior to the issuance of project specific construction documents, the District Engineer shall retain a Professional Paleontologist to observe all earth-disturbing activities. All fossil materials recovered during mitigation monitoring shall be cleaned, identified, cataloged,and analyzed in accordance with standard professional practices.The results ofthe field work and laboratoryanalysis shall be submitted in a technical report and the entire collection transferred to an approved facility. 2017 CSMP SPEI R Mitigation Measure CULT-5: Disturbance to Human Remains.

As specified by California Health and Safety Code Section 7050.5, if human remains are found on the project site during construction or during archaeological work,the person responsible forthe excavation,or his or her authorized representative, shall immediately notify the San Diego County Coroner's office by telephone. No further excavation or disturbance of the discoveryor any nearby area reasonably suspected 28 03/08/2022 C7 40 of 159

Smilax-Mimosa Sewer Improvements Project
to overlie adjacent remains (as determined by the Qualified Archaeologist and/or the traditionally and culturally affiliated [TCA] Native American Monitor)shall occur until the Coroner has made the necessary findings as to origin and disposition pursuant to Public Resources Code 5097.98.If such a discovery occurs, a temporary construction exclusion zone shall be established surroundingthe area of the discovery so that the area would be protected(as determined bythe Qualified Archaeologist and/or the TCA Native American Monitor),and consultation and treatment could occur as prescribed bylaw.As further defined by State law, the Coroner would determine within two working days of being notified if the remains are subject to his or her authority. Ifthe Coroner recognizesthe remainsto be Native American, he or she shall contact the NAHC within 24 hours. The NAHC would make a determination as to the Most Likely Descendent. If Native American remains are discovered,the remains shall be kept "in situ" ("in place"),or in a secure location in close proximity to where they were found, and the analysis of the remains shall only occur on site in the presence ofthe TCA Native American Monitor.

VI. GEOLOGYAND SOILS
New
Significant
Impact due
to Unusual
Circum- No Impact
Impact stances or or Less SPEIR New
Analyzed Substantial than Mitigation Mitigation in the New Significant Measure(s) Measure(s) Would the project: SPEIR Information Impact Applicable Required a) Expose people orstructuresto
potential substantial adverse
effects,including the risk of loss,
injury,or death involving:
i. Rupture of known earthquake fault,
as delineated on the most recent
Alquist-Priolo Earthquake Fault
Zoning Map issued by the State
Geologist for the area or based on ❑ ❑ 0 ❑ ❑ other substantial evidence of
known fault?Refer to Division of
Mines and GeologySpecial
Publication42.
ii. Strong seismicground shaking? ❑ ❑ ■ ❑ ❑ iii. Seismic-related ground failure,
including liquefaction? ❑ ❑ 0 ❑ ❑
iv. Landslides? ❑ ❑ ■ ❑ ❑
b) Result insubstantial soil erosion or
the loss of topsoil? ❑ ❑ 0 ❑ ❑
c) Be located on a geologic unit or soil that is
unstable,or that would become unstable
asa result of the project,and potentially ❑ ❑ ❑ ❑ result in on- or off-site landslide,lateral
spreading,subsidence, liquefactionor
collapse?
29 03/08/2022 C7 41 of 159

Smilax-Mimosa Sewer Improvements Project
New
Significant
Impact due
to Unusual
Circum- No Impact
Impact stances or or Less SPEIR New
Analyzed Substantial than Mitigation Mitigation in the New Significant Measure(s) Measure(s) Would the project: SPEIR Information Impact Applicable Required d) Be located on expansive soil,as defined
in Table 18-1-B of the Uniform Building ❑ ❑ 0 ❑ ❑ Code(1994),creating substantial risks
to life or property?
e) Have soils incapable of adequately
supporting the use of septictanks or
alternative wastewater disposal systems ❑ ❑ ■ ❑ ❑ where sewers are not available forthe
disposal of wastewater?
A Geotechnical Investigation(Geocon 2021;see Appendix C)was prepared by Geocon, Inc.for the project.

Relevant findings from the reports are incorporated below. a) Expose people or structures to potential substantial adverse effects,including the risk of loss,injury, or death involving:
i. Rupture of a known earthquake fault,as delineated on the most recent A lquis t-Priolo Earthquake Fault Zoning Map issued by the State Geologist for the area or based on other substantial evidence of a known fault?
Less than Significant Impact. As stated in the City of Vista General Plan 2030 Update PEIR, the City is not located on any known active or potentially active faults as defined by the California Geological Survey and is not located within an Alquist-Priolo Earthquake Fault Zone.Similarly,the Countyof San Diego General Plan Update Final Program EIR does not identify the land areas affected by the proposed improvements as being within an Alquist-Priolo fault zone, nor are any known active of potentially active faults identified on or nearthe project site(CountyofSan Diego2011).As indicated in the Cityof San Marcos General Plan Safety Element, no known active or potentially active regional faults are located within San Marcos(CityofSan Marcos 2012).

The Rose Canyon Fault is located approximately 12 miles west of the Cityand is the nearest earthquake fault zone. As such, fault rupture within the City is considered to be low (City of Vista 2011b) and it is not anticipated that this fault would adversely affect the project site. Further,the project would be required to conform with current seismic structural design standards of the CCR Title 24(California Building Standards Code)to ensure stability and minimize potential adverse effects from potential ground rupture. As such, impacts would be less than significant.
ii. Strong seismic ground shaking?
Less than Significant Impact.Refer also to Res ponseVI(a)(i),above.A seismic event along the Rose Canyon Fault could result in seismic ground shaking at the project site. Seismic ground shaking may have the potential to affect the in-ground structures associated with the proposed improvements. Project compliance with design recommendations identified in the project-specific Geotechnical Investigation (Geocon 2021; see Appendix C), in combination with seismic design standards identified in the current version of the California Building Standards Code,which have been incorporated into the District's construction standards, would reduce the potential to expose people or structuresto potential substantial adverse effects,including 30 03/08/2022 C7 42 of 159

Smilax-Mimosa Sewer Improvements Project
the risk of loss, injury, or death from strong seismic ground shaking. Project conformance with such recommendations and standards would reduce potential impactsto less than significant. iii. Seismic-related ground failure,including liquefaction? No Impact. Referalso to Responses VI(a)(i)and (ii), above. Liquefaction is the phenomenon whereby soils lose shear strength and exhibit fluid-like flow behavior. Loose granularsoils are most susceptible to these effects,with liquefaction generally restricted to saturated or near-saturated soils at depths of less than 50 feet. Liquefaction normally occurs in soils such as sand in which the strength is purely friction. However, liquefaction has occurred in soils otherthan clean sand.Liquefaction occurs under vibratory conditions such as those induced by a seismic event.

Due to the lack of a permanent, near-surface groundwater table and the very dense nature of the underlying formational materials, liquefaction potential for the affected area is considered to be very low (Geocon 2021). As such, it is not anticipated that the project would result in exposure of people or structures to potential substantial adverse effects, including the risk of loss, injury, or death involving seismic-related ground failure, including liquefaction. No impact would occur in this regard. iv. Landslides?
No Impact. Non-seismically induced landslides can be caused by water from rainfall, septic systems, landscaping, or other origins that infiltrate slopes with unstable material. The land area affected by the proposed improvements is generallyflat and does not contain steepslopes(i.e.,greaterthan 25 percent) that would be susceptible to the potential for landslide occurrence. According to findings in the Geotechnical Investigation (Geocon 2021; see Appendix C), no signs or evidence of previous or potential slope instability was observed during the field exploration for the improvements along Mimosa Drive; no landslides are present on or adjacent to the subject site. Therefore, no impact would occur from the exposure of people or structures to potential adverse effects from landslides. b) Result in substantial soil erosion or the loss of topsoil? Less than Significant Impact. During the project construction period, ground disturbance would result in the exposure of soils which may be susceptible to erosion. The project would be subject to conformance with the City of Vista Grading and Erosion Control Ordinance, as applicable,to minimize the potential for erosion to occur. Upon completion of the proposed improvements, disturbed areas within the existing roadways would be repaved as needed; other improvements proposed would occur below the ground surface and would therefore not substantially disturb affected soils or result in the potential for surface erosion. No stockpiles or open soil would remain at the completion of construction activities. As such,it is not anticipated that the project would result in substantial soil erosion or the loss of topsoil. Impacts would be less than significant.
c) Be located on a geologic unit or soil that is unstable, or that would become unstable as a result of the project, and potentially result in on- or off-site landslide, lateral spreading, subsidence, liquefaction, or collapse?
Less than Significant Impact.Refer to Response VI(a),above.As indicated in the Geotechnical Investigation prepared for the project, the subject site is underlain by granite rock, with areas of artificial fill and the Santiago Formation(below the artificial fill). Due tothe dense nature of the underlying geologic formations, the potential for liquefaction is considered to be very low. Additionally,affected soils are not susceptibleto landslide (Geocon 2021; see Appendix C)and are considered to be relatively stable. It is anticipated that other maintenance improvements proposed (e.g., manhole maintenance)would not result in potential adverse effects due to an unstable geologic unit or soil or result in on-or off-site landslide, lateral spreading, subsidence, liquefaction, or collapse, due to the nature of the proposed activities. Impacts would be less than significant.
31 03/08/2022 C7 43 of 159

Smilax-Mimosa Sewer Improvements Project
d) Be located on expansive soil,as defined in Table 18-1-B of the Uniform Building Code(1994),creating substantial risks to life or property?
No Impact.The Geotechnical Investigation prepared for the proposed project indicates that on-site soils encountered are considered to be non-expansive as defined by the California Building Code Section 1803.5.3,and it is anticipated thatthe majority of soils encountered possess a very low to medium expansion potential(Geocon 2021;see Appendix C). No impact would occur in this regard. e) Have soils incapable of adequately supporting the use of septic tanks or alternative wastewater disposal systems where sewers are not available for the disposal of wastewater? No Impact.The project is a sewer infrastructure improvement project and does not propose development of residentialor other land uses that would generatethe need for the use ofseptictanksor other alternative wastewater disposal systems.No impact would occur in this regard.

VII. GREENHOUSE GAS EMISSIONS
New
Significant
Impact due
to Unusual
Circum- No Impact
Impact stances or or Less SPEIR New
Analyzed Substantial than Mitigation Mitigation in the New Significant Measure(s) Measure(s) Would the project: SPEIR Information Impact Applicable Required a) Generate greenhouse gas emissions,
either directly or indirectly,that may 0 ❑ 0 ❑ ❑ have a significant impact on the
environment?
b) Conflict with an applicable plan,policy
or regulation adopted forthe purpose ❑ 0 ❑ ❑ of reducing the emissionsof
greenhouse gases?
c) Result in the wasteful,inefficient,or ❑ 0 ❑ ❑ unnecessary consumption of energy?
a) Generate greenhouse gas emissions, either directly or indirectly, that may have a significant impact on the environment?
Less than Significant Impact. Certain gases in the earth's atmosphere, classified as greenhouse gases (GHGs), playa critical role indeterminingthe earth's surface temperature.Prominent GHGs contributing to the greenhouse effect are carbon dioxide (CO2), methane (CHA and nitrous oxide (N20). Human-caused emissions of these GHGs in excess of natural ambient concentrations are believed to be responsible for intensifying the greenhouse effectand leadingto a trend of unnatural warmingofthe earth's climate, known as global climate change or global warming.

The project would not impede the attainment of the GHG reduction goals for 2030 or 2050 identified in Executive Order(EO)S-03-05 and SB 32. EO S-03-05 establishes the following goals:GHG emissions should be reduced to 2000 levels by 2010,to 1990 levels by 2020,a nd to 80 percent below 1990 levels by 2050.SB 32 establishes a statewide GHG emissions reduction target wherebythe California Air Resources Board (CARB),in adopting rules and regulations to achievethe maximum technologically feasible and cost-effective 32 03/08/2022 C7 44 of 159

Smilax-Mimosa Sewer Improvements Project
GHG emissions reductions, shall ensure that statewide GHG emissions are reduced to at least 40 percent below 1990 levels by December 31,2030.

In order to meet the statewide GHG emissions reduction targets set for 2020 and 2050, the City of Vista developed an interim threshold in 2016; however, no guidance or revised thresholds have since been adopted to address the GHG reduction target beyond 2020.The 2016 interim guidance identifies a "bright line"threshold which considers future anticipated development within the City.A level of 1,185 metric tons (MT)of carbon dioxide equivalent (CO2e)was identified as capturing an estimated 90 percent of the Citys GHG emissions attributable to such anticipated future development. In evaluating whether a proposed development project is substantially contributing to achievement ofthe established GHG emissions targets identified in the CAP and AB 32,total GHG emissions of a project in its first fully operational year must not exceed the identified "bright line" threshold. If project emissions do not exceed the threshold, a project is not considered to have a significant environmental impact,either directly or indirectly,due tothe generation of GHG emissions.

Direct Effects — Construction and Operations:The evaluation of annual GHG emissions resulting with implementation of the 2017 CSMP considered a conservative scenario in which all near-term capacity- related improvements identified in the CMSP occurred at the same time (not amortized).Such a scenario was intendedto provide a worst-casescenario for the potential generation of GHG emissions resulting with the intended improvements to the District's infrastructure facilities. Such annual GHG emissions from construction were calculated to reach approximately 1,059 MT CO2e.As such, under a worst-case scenario, the adopted threshold of 1,185 MT CO2e would not be exceeded.

Project construction would require the operation of construction vehicles and equipment, delivery of supplies,and worker-generated vehicle trips.Due to the nature and extent of the proposed improvements, such project-related construction emissions would be limited and short term.Over the long term, routine maintenance of the affected sewer infrastructure facilities would occur on a periodic basis and would require use of maintenance vehicles and equipment that would generate GHG emissions; however, long-term maintenance requirements are not expected to generate a substantial number of vehicle trips or GHG- related emissions from equipment operation,due to the typical limited scale and nature.Additionally,the proposed improvements would not result in an increase in wastewater treatment demands,which could havethe potential to increase GHG-related emissions.

The proposed infrastructure improvements are consistent with those anticipated in the District's Master Plan. Therefore, it can be assumed that anticipated GHG emissions generated by the proposed improvements would result in a less than significant impact, similar to that identified in the 2017 CSMP SPEIR. Impacts in this regard aretherefore considered to be less than significant.

Indirect Effects: Construction and operation of the proposed improvements are not anticipated to result in a net increase in indirect GHG emissions from energy use,solid waste disposal,or water use.The resulting infrastructure would be passive and would not generate solid waste or result in energy or water use.The proposed improvements would therefore not result in a net increase in energy demand. Indirect effects in this regard would be less than significant.
b) Conflict with an applicable plan, policy, or regulation adopted for the purpose of reducing the emissions of greenhouse gases?
Less than Significant Impact. Refer to Response VII(a), above. The project would generate limited GHG emissions during construction and operations and would not exceed the significance threshold adopted by the City of Vista. As such, the project is not anticipated to conflict with an applicable plan, policy, or regulation adopted for the purpose of reducing GHG emissions.Impactswould be less than significant. 33 03/08/2022 C7 45 of 159

Smilax-Mimosa Sewer Improvements Project
c) Result in the wasteful,inefficient,or unnecessary consumption of energy? Direct Effects—Construction:Refer to Response VI I(a),above. Energy use during short-term construction of the proposed improvements would result in the consumption of fossil fuels from operation of construction vehicles and equipment. Standard construction practices and equipment would be utilized and would not be anticipatedto result in the wasteful,inefficient,or unnecessary consumption of energy as a result. Impacts would be less thansignificant inthis regard.

Direct Effects—Operations:Referto Response VII(a),above.Operation is not anticipated to result in a net increase in energy use,due to the nature of the sewer infrastructure improvements proposed.Therefore, operation would not result in the wasteful, inefficient, or unnecessary consumption of energy. Impacts would be less than significant.

Indirect Effects:The proposed improvements would not result in indirect effects related to energy as construction and operation would not enable or encourage any off-site energy use. No impact would occur.

VIII. HAZARDS AND HAZARDOUS MATERIALS
New
Significant
Impact due
to Unusual
Circum- No Impact
Impact stances or or Less SPEIR New
Analyzed Substantial than Mitigation Mitigation in the New Significant Measure(s) Measure(s)
Would the project: SPEIR Information Impact Applicable Required a) Create a significant hazardto the
public or the environment through ❑ 0 ❑ ❑ the routine transport,use, or
disposal of hazardous materials?
b) Create a significant hazardto the
public or the environment
through reason ably foreseeable
upsetand accident conditions ■ ❑ ❑ ■ ❑ involvingthe releaseof
hazardous materials intothe
environment?
c) Emit hazardous emissions or handle
hazardous or acutely hazardous
materials,substances,orwaste within ■ ❑ ■ ❑ ❑ one-quarter mile of an existing or
proposed school?
d) Be located on a site which is
included on a list of hazardous
materials sites compiled pursuantto
Government Code Section65962.5 ■ ❑ ■ ❑ ❑ and,asa result,would it create a
significant hazard to the publicor
the environment?
34 03/08/2022 C7 46 of 159

Smilax-Mimosa Sewer Improvements Project
New
Significant
Impact due
to Unusual
Circum- No Impact
Impact stances or or Less SPEIR New
Analyzed Substantial than Mitigation Mitigation in the New Significant Measure(s) Measure(s)
Would the project: SPEIR Information Impact Applicable Required e) For a project locatedwithin an airport
land use plan or,where such a plan
has not been adopted, within two
miles of a public airport or public use ■ ❑ ■ ❑ ❑ airport,wouldthe project result in a
safety hazard for people residingor
working in the project area?
f) For a projectwithin thevicinityof a
private airstrip,wouldthe project ■ ❑ ■ ❑ ❑ result in a safety hazard for people
g) Impair implementation of or
physically interfere with an ❑ ❑ 0 ❑ adopted emergency response plan
or emergency evacuation plan?
h) Expose people orstructuresto a
significant riskof loss,injury or death
involving wildland fires, including ❑ ❑ 0 ❑ where wild lands are adjacent to
urbanized areas orwhere residences
are intermixedwithwildlands?
a) Create a significant hazard to the public or the environment through the routine transport, use, or disposal of hazardous materials?
Less than Significant Impact.

Direct Effects - Construction: Construction activities would require limited use of potentially hazardous substances that may include fuels and oils associated with construction vehicles and equipment, hydraulic fluids,and/or solvents.The construction contractorwould be required to implement standard construction practice and safety procedures related to the transport, use, and disposal of hazardous materials. With conformance to applicable federal, state, and local regulations pertaining to the use and handling of hazardous substances, typical use of construction-related hazardous materials for the proposed improvements would not create a significant hazardtothe public. Impactswould be less than significant.

Direct Effects- Operations: Due to the nature of the sewer infrastructure system, the use of hazardous materials in operations is not anticipated. Such activities would not create a hazard to the public of the environment through the routine transport,use,or disposal of hazardous materials. No impactwould occur.

Indirect Effects:Short-term construction activities may involve the transport,use,and disposal of hazardous materials.These activities are unlikely to result in adverse, indirect effects to adjacent land uses. Indirect impacts are considered lessthan significant.
35 03/08/2022 C7 47 of 159

Smilax-Mimosa Sewer Improvements Project
b) Create a significant hazard to the public or the environment through reasonably foreseeable upset and accident conditions involving the release of hazardous materials into the environment? SPEIR Mitigation MeasureApplicable.

Direct Effects-Construction:Construction of the proposed improvements would requirethe limited use of toxic and/or hazardous substances that are typical for construction-related activities (i.e., oils, fuels, hydraulic fluids,and solvents).Although the potential for accidental releases(e.g.,spilling of hydraulic fluids or diesel fuel from on-site construction equipment maintenance) does exist, it is anticipated any such incidents would be limited to small volumes and/or low concentrations.The construction contractor would be required to implement standard construction controls and safety proceduresto avoid accident conditions and properly minimize such conditions in such an event.Additionally,construction would involve excavation activities,which could encounter undocumented contaminated soils and/or groundwater. Implementation of mitigation measure HAZ-1 as identified in the 2017 CSMP SPEIR would be required to reduce potential impacts to less than significant.

Direct Effects-Operations:The proposed improvements are intended to reduce the potential for pipeline leaks or infrastructure failure that could create a significant hazard to the public or the environment.

Potential direct effects from system operations are anticipated to be less than significant in this regard.

Indirect Effects: Potential indirect effects resulting with the proposed improvements may occur with accidental releaseof hazardous materialsduring construction. Implementation of mitigation measure HAZ- 1 as identified in the 2017 CSMP SPEIR would reduce indirect impacts to less than significant. c) Emit hazardous emissions or handle hazardous or acutely hazardous materials,substances,or waste within one-quarter mile of an existing orproposed school? Less than Significant Impact.

Direct Effects- Construction:The nearest school to the project site is the Joli Ann Leichtag Elementary School, located at 653 Poinsettia Avenue, adjacent to the southern portion of where maintenance improvements are proposed(manhole rehabilitation). However,due tothe limited nature of the intended construction activities and conformance with applicable federal, state,and local standardsforthe handling and disposal of hazardous substances,it is not anticipated that the proposed improvements would result in the emission or handling of hazardous materials thatwould cause a significant effecttothe existing school.

Impacts would be less than significant.

Direct Effects- Operations: The proposed sewer infrastructure system would operate underground and would not generally require the use of hazardous materials.Once constructed,the proposed improvements would not adverselyaffect anyarea schools.Impactsare considered lessthan significant.

Indirect Effects: No adverse indirect impacts toschools from project implementation are anticipated. d) Be located on a site which is included on a list of hazardous materials sites compiled pursuant to Government Code Section 65962.5 and,as a result, would it create a significant hazard to the public or the environment?
Less than Significant Impact.

Direct Effects-Construction and Operations:The affected land area is not located on a site included on a list of hazardous material sites pursuant to Government Code Section 65962.5. No sites identified in the State Water Resources Control Board's (SWRCB) Geotracker database (SWRCB 2021) or the California Department of Toxic Substances Control's (DTSC) Envirostor database (DTSC 2021)occur on the affected lands.One site was listed at the Joli Ann Leichtag Elementary School, located adjacent tothe south of where improvements would occur;however,thissite was an investigation and no action was required(DTSC 2021).

Impacts would be less than significant inthis regard.
36 03/08/2022 C7 48 of 159

Smilax-Mimosa Sewer Improvements Project
Indirect Effects: No adverse, indirect impacts associated with hazardous materials sites have been identified.
e) For a project located within an airport land use plan or, where such a plan has not been adopted, within two miles of a public airport or public use airport,would the project result in a safety hazard for people residing or working in the project area?
No Impact.

Direct Effects-Construction and Operations: The affected area is not located within an airport influence area. The nearest airport to the project site is the McClellan-Palomar Airport, located approximately 4.4 miles tothe southwest.Due to distance,the proposed improvements would not result in an airplane safety hazard for the temporary construction workers or occasional ma intena nce workers. No impact would occur.

Indirect Effects:Noadverse indirect impactsto airports are anticipated from project implementation. f) For a project within the vicinity of a private airstrip, would the project result in a safety hazard for people residing or working in the project area?
No Impact.There are no private airstrips located in the vicinity of the project site. Therefore, no impact would occur relativetothis issue.
g) Impair implementation of or physically interfere with an adopted emergency response plan or emergency evacuation plan?
SPEI R Mitigation Measu res Applicable.

Direct Effects- Construction:Construction occurring within Mimosa Avenue, Smilax Road, and/or other public rights-of-way,easements,or private properties may have the potential to result in temporary effects on circulation in the area. Lane reductions may result in impaired emergency vehicle access. Potential impacts would be reduced with incorporation of 2017 CSM P SPE I R mitigation measure TR-1,a s a ppropriate to the improvements undertaken, to reduce impacts to less than significant. Refer also to Section XVI, Transportation and Traffic.

Direct Effects-Operations:Once constructed,the proposed improvements would be located underground.

As such, no impairment or physical interference with an adopted emergency response plan or emergency evacuation plan would result. No impact would occur.

Indirect Effects: The proposed improvements would be underground and would not interfere with emergency access.No indirect impacts would occur.
h) Expose people or structures to a significant risk of loss, injury, or death involving wildland fires, including where wildlands are adjacent to urbanized areas or where residences are intermixed with wildlands?
SPEIR Mitigation Measures Applicable.

Direct Effects-Construction and Operation:The project site is located in a highly urbanized area.According tothe California Department of Fire and Forestry(Calfire)the siteis not identified as a Very High Fire Hazard Severity Zone (VHFHSZ)for a Local Responsibility Area (SRA) (Calfire 2021)or a Local Responsibility Area (LRA) (Calfire 2021), and therefore, the potential risk of wildfire is considered to be low. As proposed infrastructure improvements would occur below the ground surface, the project would not result in structural elements that would expose people or structures to a significant risk of loss, injury, or death involving wildland fires, including where wildlands are adjacent to urbanized areas or where residences are intermixed with wildlands. However, per the 2017 CSMP SPEIR, mitigation measures HAZ-3 and HAZA would be implemented to ensure that the risk for wildfire is minimized to the extent feasible by keeping 37 03/08/2022 C7 49 of 159

Smilax-Mimosa Sewer Improvements Project
construction and staging areas clear of combustible materials and by ensuring that sufficient fire suppression equipment is available if needed. Impacts would be reduced to less than significantwith incorporation of mitigation measures HAZ-3and HAZ-4.

Indirect Effects:The proposed improvements would be located underground and would therefore not expose people or structures to a significant risk of loss, injury,or death involving wildland fires. No impact would occur.

Applicable Mitigation Measures
2017 CSMPSPEIR Mitigation Measure HAZ-1:Halt Construction Work if Potentially Hazardous Materials are Encountered.

All construction contractors shall immediately stop all surface or subsurface activities in the event that potentially hazardous materials are encountered,an odor is identified,or considerably stained soil is visible.

Contractors shall follow all applicable local, state,and federal regulations regarding discovery, response, disposal, and remediation for hazardous materials encountered during the construction process. These requirements shall be included in the contractor specifications.

If any hazardous materials,wastesites,or vapor intrusion risks are identified prior to or during construction, a qualified professional, in consultation with appropriate regulatory agencies,will develop and implement a plan toremediate the contamination and properlydisposeof the contaminated material.

If material imports are proposed, the contractor shall furnish the City with appropriate documentation certifying that the imported materials are free of contamination. 2017 CSMPSPEIR Mitigation Measure HAZ-3:Keep Construction Area Clear of Combustible Materials.

During construction,construction contractors shall ensure that staging areas,welding areas,or areas slated for construction using spark-producing equipment shall be cleared of combustible vegetation or other materials that could serve as fire fuel.All vegetation clearing shall be coordinated with a qualified biologist and any required permits prior to removal. The contractor shall keep these areas clear of combustible materials in order to maintain a firebreak. Any construction equipment that normally includes a spark arrester shall be equipped with an arrester in good working order. This includes, but is not limited to, vehicles, heavyequipment,andchainsaws.
2017 CSMP SPEI R Mitigation Measure HAZ-4:Provide Accessible Fire Suppression Equipment.

Work crews shall be required to have sufficient fire suppression equipment readily available to ensure that any fire resulting from construction activities is immediately extinguished. All off-road equipment using internal combustion engines shall be equipped with sparkarrestors.

IX. HYDROLOGYAND WATER QUALITY
New
Significant
Impact due
to Unusual
Circum- No Impact
Impact stances or or Less SPEIR New
Analyzed Substantial than Mitigation Mitigation in the New Significant Measure(s) Measure(s) Would the project: SPEIR Information Impact Applicable Required a) Violate anywater quality standards
orwaste discharge requirements? ❑ ❑ ❑ 38 03/08/2022 C7 50 of 159

Smilax-Mimosa Sewer Improvements Project
New
Significant
Impact due
to Unusual
Circum- No Impact
Impact stances or or Less SPEIR New
Analyzed Substantial than Mitigation Mitigation in the New Significant Measure(s) Measure(s) Would the project: SPEIR Information Impact Applicable Required b) Substantially deplete groundwater
suppliesor interfere substantially with
groundwater recharge such thatthere
would be a net deficit in aquifer volume
or a lowering of the local groundwater ■ ❑ ■ ❑ ❑ table level(e.g.,the production rate of
pre- existing nearbywellswould drop to
a level which would not support existing
land uses or planned usesforwhich
permits have been granted)?
c) Substantially alterthe existing drainage
pattern of the site or area,including
through the alteration of the course ofa ■ ❑ ■ ❑ ❑ stream or river,in a manner which would
result in substantial erosion or siltation
on-or off-site?
d) Substantially alterthe existing drainage
pattern of the site or area,including
through the alteration of the course ofa
stream or river,or substantially increase ■ ❑ ■ ❑ ❑ the rate or amount of surface runoff in a
manner which would result in flooding
on-or off- site?
e) Create or contribute runoff water which
would exceed the capacity of existing or
planned stormwater drainage systems ■ ❑ ■ ❑ ❑ or provide substantial additional
sourcesof polluted runoff?
f) Otherwise substantially degrade water ■ ❑ ❑ ■ ❑ quality?
g) Place housing within a 100-year flood
hazard area as mapped on a federal
flood Hazard Boundary or Flood ■ ❑ ■ ❑ ❑ Insurance Rate Map orotherflood
hazard delineation map?
h) Place within a 100-yearflood hazard
area structures which would impede or ■ ❑ ■ ❑ ❑ redirectflood flows?
i) Expose people or structures to a
significant riskof loss,injury or death ■ ❑ ■ ❑ ❑ involving flooding,including flooding as
a result of the failure of a levee or dam?
j) Inundation byseiche,tsunami,or ■ ❑ ■ ❑ ❑ mudflow?
39 03/08/2022 C7 51 of 159

Smilax-Mimosa Sewer Improvements Project
a) Violate any water quality standards or waste discharge requirements? SPEIR Mitigation MeasureApplicable
Direct Effects - Construction: Construction activities associated with the proposed improvements may generate potential sediments, fuels, hydraulic fluids,solvents,and/or other substances that may have the potential to affect water quality. Construction activities would require demolition, excavation/trenching, stockpiling of soils, re-paving, and/or similar activities. Construction would generally occur within paved public rights-of-ways or developed/disturbed properties(i.e.,parking lots)and run-off would be discharged into the local storm drain system.

The proposed improvements would be subject to local erosion control and grading standardsto ensure that the potential for construction-related contaminants to enter local storm drains and receiving waters is minimized. Construction activities would be subject to District standards for the protection of stormwater and implementation of a water quality management plan prepared and implemented by a qualified stormwater professional in compliance with the requirements of the NPDES General Construction Permit, in order to minimize any pollutant discharge generated. Best management practices for the protection of stormwater are anticipated to include the installation of gravel bags around storm drain inlets and the covering of any stockpiles to achieve erosion and sedimentation control. Such practices would be implemented by the construction contractor as part of the right-of-way permit issued for the proposed improvements. The water quality management plan will be subject to review and approval by the City of Vista Engineer prior to the commencement of work. Furthermore, the project would be subject to implementation of mitigation measure HWQ-1, as identified in the 2017 CSMP SPEIR, for stormwater protection. Therefore, with incorporation of mitigation measure HWQ-1, construction of the proposed improvements would not violate water quality standards or waste discharge requirements, and impacts would be less than significant.

Direct Effects-Operations: Periodic maintenance ofthe proposed improvements would be performedvia existing/proposed manholes and would not be anticipatedto require any ground disturbance. Maintenance would require minimal ground disturbing activities and is not anticipated to contribute to or result in water quality contamination.Operational impacts would be less than significant in this regard.

Indirect Effects:The proposed improvements would enhance operation and functionality of the affected sewer system while reducing the potential for leaks or infrastructure failure,which may in turn, indirectly contribute to decreased water quality. No indirect impacts would occur. b) Substantially deplete groundwater supplies or interfere substantially with groundwater recharge such that there would be a net deficit in aquifer volume or a lowering of the local groundwater table level (e.g.,the production rate of pre-existing nearby wells would drop to a level which would not support existing land uses or planned uses for which permits have been granted)? Less than Significant lmpact.

Direct Effects - Construction:The proposed improvements would not involve the use of groundwater.

Dewatering of the construction area along Mimosa Avenue is not anticipated to be required based upon the fact that groundwater was not encountered during the geotechnical field investigation (Geocon 2021). If dewatering is required, it is anticipated to be discharged into the Buena Sanitation sewer system.

Dewatering would not be applicable if the proposed improvements are not extended near/below the groundwater level. The need for dewatering during construction, if applicable,would be identified during the pending geotechnical investigation. A Special Use Discharge Permit would be required should groundwater be encountered or identified.Any potential effects on groundwater would be short-term and would occur in conformance with applicable state and local regulations and permitting requirements.

Impacts would be less than significant.
40 03/08/2022 C7 52 of 159

Smilax-Mimosa Sewer Improvements Project
Direct Effects - Operations: Operation of the proposed improvements would not require the use of groundwater. No impact would occur.

Indirect Effects: Following construction, disturbed surfaces would be restored to existing conditions; no increase in impervious surfaces is anticipated.The projectwould therefore not contribute to indirecteffects on groundwater supplies or recharge. No impact would occur. c) Substantially alter the existing drainage pattern of the site or area, including through the alteration of the course of a stream or river, in a manner which would result in substantial erosion or siltation on-or off-site?
Less than Significant lmpact.

Direct Effects-Construction:Construction activities(for example,trenching)may temporarilyalter surface runoff drainage patterns in the areas affected by the proposed improvements. Such activities would be requiredto comply with Countyof San Diego's Grading Ordinance requirements toensure that substantial erosion or siltation on-or off-site do not occur. Construction impacts would be less than significant in this regard.

Direct Effects - Operations: Upon completion of the infrastructure improvements, disturbed ground surfaces would be restored to existing conditions,and no substantial erosion or siltation effects would occur.

Impacts to drainage patternswould be less than significant inthis regard.

Indirect Effects:The proposed improvements would be located below ground and would therefore not result in potential indirect effects on surface drainage patterns.No impact would occur. d) Substantially alter the existing drainage pattern of the site or area, including through the alteration of the course of a stream or river, or substantially increase the rate or amount of surface runoff in a manner which would result in flooding on-or off-site?
Less than Significant lmpact.

Direct Effects-Construction:Due to nature of the proposed improvements and limited surface disturbance required, no increase in the rate or amount of surface runoff or potential for on-site or off-site flooding would occur. Impacts would be less than significant.

Direct Effects- Operations: Following completion of the proposed improvements, any disturbed surface areas would be restored to existing conditions,and no increase in impervious surfaces or surface runoff would occur that may result in flooding. Impacts would be less than significant.

Indirect Effects:The proposed improvements would be located below ground and would therefore not result in potential indirect effects on surface drainage patterns.No impact would occur. e) Create or contribute runoff water which would exceed the capacity of existing or planned stormwater drainage systems or provide substantial additional sources of polluted runoff? Less than Significant Impact.

Direct Effects - Construction: Refer to Response IX(a), above, regarding stormwater water quality. As stated, due to the nature of the proposed improvements and limited surface disturbance required, no increase in the rate or amount of surface runoff is anticipated.Therefore,the proposed improvements are not anticipated to create or contribute runoff water that would exceed the capacity of existing or planned stormwater drainage systems or provide substantial additional sources of polluted runoff. Impacts would be less than significant.

Direct Effects-Operations:Following construction,areas disturbed bythe proposed improvements would be restored to existing conditions; no increase in impervious surfaces or surface runoff would occur. Project 41 03/08/2022 C7 53 of 159

Smilax-Mimosa Sewer Improvements Project
operations would not create or contribute runoff water that would exceed the capacity of existing or planned stormwater drainage systems or provide substantial additional sources of polluted runoff. No impact would occur.

Indirect Effects:The proposed improvements are intended to improve the existing infrastructure system and reduce the potential for leaking and/or associated effects on water quality deterioration. No indirect impacts would occur in this regard.
f) Otherwise substantially degrade water quality?
SPEIR Mitigation MeasureApplicable
Direct Effects-Construction: Refer Response IX(a),above.

Direct Effects-Operations:Referto Response IX(a),above.

Indirect Effects:Refer Response IX(a),above.
g) Place housing within a 1 00-yearflood hazard area as mapped on a federal flood Hazard Boundary or Flood Insurance Rate Map or other flood hazard delineation map? No Impact.

Direct Effects - Construction and Operations:. No new housing is proposed, nor would the proposed improvements generate new population growth or the need for construction of additional housing that would be located within a 100-year flood hazard area. No impact would occur as a result of project implementation.

Indirect Effects:The project is intended to ensure that adequate wastewater services can continue to be provided bythe District. No new housing is proposed,nor would the proposed improvements generate new population growth or the need for construction of additional housing that would be located within a 100- yearflood hazard area. No indirect impacts would occur as a result of project implementation. h) Place within a 100-year flood hazard area structures which would impede or redirect flood flows? No Impact.

Direct Effects - Construction and Operations: The proposed improvements would be constructed underground and would require minimal ground disturbance during installation. No substantial change to on-site drainage patterns would occur;no structureswould be placed within a 100-yearflood hazard area.

Therefore, the project would not impede or redirect existing flood flows. No impact would occur in this regard.

Indirect Effects:The project does not propose the construction of any physical structures within a 100-year flood hazard area. No indirect impacts would result with project implementation. i) Expose people or structures to a significant risk of loss, injury or death involving flooding, including flooding as a result of the failure of a levee or dam?
Less than Significant Impact. Maerkle/Squires Dam is located approximately 2.8 miles southwest of the project area in the City of Carlsbad.According to the 2008 SMPU PEIR,the area affected by the proposed infrastructure improvements is not subject to inundation in the event of dam failure (City of Vista 2008).

Impacts would be less than significant.
j) Inundation by seiche,tsunami,ormudflow?
No Impact. The project area is located approximately 7.5 miles to the east of the Pacific Ocean; due to distance and topography, the potential for inundation by tsunami is considered to below (Geocon 2021). 42 03/08/2022 C7 54 of 159

Smilax-Mimosa Sewer Improvements Project
Additionally, no large bodies of water are located in the project vicinity that would be subject to a seiche event.The lands affected by the proposed improvements are generally flat and no steep slopes are present.

Due to such conditions, inundation of the site by seiche or mudflow is considered to be low. No impact would occur in this regard.

SPEIR Mitigation Measures Applicable
2017 CSMP SPEIR Mitigation Measure HWQ-1: Assess Project Risk, Receiving Water Vulnerability, and I mplement a Water Quality Protection Strategy.

The construction contractor will assessthe receiving watervulnerabilityand develop a SWPPP that complies with the requirements of the NPDES General Construction Permit (Order2009-0009-DWQas amended by 2010 0014-DWQand 2012-006-DWQ)based on the project-specific risk level subject to the City Engineer's approval. The SWPPP shall identify specific actions and BMPs relating to the prevention of stormwater pollution from project-related construction sources by identifying a practical sequence for site restoration, BMP implementation, contingency measures, responsible parties,and agency contacts. The SWPPP shall reflect localized surface hydrological conditions,localjurisdictional requirements.and shall be reviewed and approved by the City Engineer prior to commencement of work.

The SWPPP shall be prepared by a qualified SWPPP developer with BMPs selected to achieve maximum pollutant removal and that represent the best available technology that is economically achievable. BMPs for soil stabilization and erosion control practices and sediment control practices will also be required.

Performance and effectiveness of these BMPsshall be determined either byvisual means where applicable (i.e.,observation of above-normal sediment release),or by actua I water sa mpling in cases where verification of contaminant reduction or elimination, (e.g., inadvertent petroleum release) is required to determine adequacy of the measure.

The SWPPP shall also address other project-specific water quality threats, as required for individual improvements including but not limited to,temporary dewatering,hydrostatic testing,and other resources permits as required under the Federal Clean WaterAct,County Grading Ordnance,and State Fish and Game Code, as applicable. Construction and post-construction BMPs will be designed to avoid the creation of standing water and potential mosquito breeding habitat.

X. LAND USE AND PLANNING
New Significant
Impact due to
Unusual Circum- SPEIR New
Impact stances or No Impact or Less Mitigation Mitigation Analyzed in Substantial New than Significant Measure(s)Measure(s) Would the Project: the SPEIR Information Impact Applicable Required a) Physically divide an established 0 ❑ 0 ❑ ❑ community?
b) Conflict with any applicable land ■ ❑ 0 ❑ ❑ use plan,policy, or regulation of an
agencywith jurisdiction over the
project(including,but not limited
to the general plan,specific plan,
local coastal program, or zoning
ordinance)adopted forthe
purpose of avoiding or mitigating
an environmental effect?
c) Conflictwith any applicable habitat ❑ ❑ ❑ conservation plan or natural
community conservation plan?
43 03/08/2022 C7 55 of 159

Smilax-Mimosa Sewer Improvements Project
a) Physically divide an established community?
Less than Significant Impact.

Direct Effects - Construction: Construction of the proposed sewer infrastructure improvements and maintenance activities would require improvements along Mimosa Drive, Smilax Road, and other public rights-of-way, easements, and private properties. Due to the nature of the proposed improvements (i.e., below ground surface), it is not anticipated that construction would result in the physical division an established community; however, temporary disturbances may occur to area access routes. Potential construction effects on the surrounding community would be minimized due to the limited area affected by the proposed improvements and the length of time required to complete the intended improvements.

Construction impacts would be less than significant inthis regard.

Direct Effects-Operations:The area affected bythe proposed improvements is highly urbanized occurs on previously developed/ and/or disturbed lands, generally surrounded by multi-family and single-family residential uses. The project does not include significant new infrastructure,such as major roadways or water supply systems or utilities, that would induce population growth or alter existing land uses.

Additionally, the proposed improvements would not remove barriers to growth, generate extraordinary economic growth,generate an indirect inducement to significant growth,be a precedent-setting action,or encroach into open space. Therefore, project operations would not significantly disrupt or divide the established community. No impact would occur.

Indirect Effects: Due to the nature of the intended sewer infrastructure improvements,the project does not propose any physical elements that would result in the division of an established community. Once construction is completed,the result of any project-related disturbance would be underground. No impact would occur in this regard.
b) Conflict with any applicable land use plan,policy,or regulation of an agency with jurisdiction over the project(including, but not limited to the general plan, specific plan, local coastal program,or zoning ordinance)adopted for the purpose of avoiding or mitigating an environmental effect? Less than Significant Impact.

Direct Effects-Construction:Land uses adjacent to the proposed improvement areas a re largely single-and multi-family residential. Construction would occur primarily within or adjacent to existing roadway rights- of-way, easements,or within private property and could result in temporary disruption of circulation on affected streets and/or neighborhood access,increased noise and dust, and public safety effects, among other effects.

As identified in the 2017 CSMP SPEI R,the proposed improvements areconsidered to be consistent with the general plans of the cities of Vista,Carlsbad,Oceanside,San Marcos,and the County of San Diego as such plans do not preclude construction of new or updated sewer facilities. Additionally, the proposed improvements would reduce potential environmental harm that may result with failureof old and degraded sewer infrastructure.As such,construction of the proposed improvements would not conflict with plans and polices of an agency with jurisdiction overthe project area adopted forthe purposeof avoiding or mitigating for adverse environmental effects. Impactswould be less than significant.

Direct Effects - Operations: The improvements identified in the 2017 CSMP were based on the latest regional growth forecasts developed by the San Diego Association of Governments (SANDAG), consistent with the adopted land uses defined in the City's General Plan 2030 Update and adopted land use plans of other adjacent jurisdictions within the City and District service area boundaries. The proposed improvements would be consistent with the 2017 CSMP and would serve the projected service populations of the Cityand District,consistent with SANDAG projections.

Additionally,the proposed improvements would not conflict with the goals and policies ofthe Public Safety, Facilities,and Services Element of the City's General Plan 2030 Update,and would support Goal PSFS 9 for 44 03/08/2022 C7 56 of 159

Smilax-Mimosa Sewer Improvements Project
the provision of sanitary sewer facilities to accommodate the safe,efficient,and cost-effective disposal of waste,commensurate with existingand anticipated future development.For development approval by local jurisdictions outside of the City, but within the City's service areas, conformance with Policy LU-14.1 of the San Diego County General Plan and Policy LU-14.1 of the San Marcos General Plan, which pertain to coordination between local service providers to ensure provision of an adequate wastewater system, is required.

As discussed in Response VI I(a),the City adopted a CAP in 2013 to reduce GHG emissions in accordance with AB 32. In 2016,the City adopted interim guidance for evaluating discretionary projects in compliance with AB 32 requirements.The proposed improvements would not exceed the threshold and would not generate GHG emissions that may have a significant impact on the environment. Therefore, implementation of the proposed infrastructure improvements would not conflict with the interim guidance orthe CAP.

As identified in the 2017 CSMP PSEI R, all future projects identified in the 2017 CSMP Update are considered to be either compatible with local land use regulations or would be compatible, subject to use permit limitations.The proposed improvements would be underground and would not be visible once construction is complete. Construction of the improvements would not preclude existing land uses on surrounding properties, norfuture development of surrounding lands. Impactsare considered lessthan significant.

Indirect Effects: No new, unplanned development or change in existing or planned land uses would occur with the proposed infrastructure improvements. Impacts would be less than significant. c) Conflict with any applicable habitat conservation plan or natural community conservation plan? Less than Significant Impact.

Direct Effects—Construction and Operation: Referto Responses I Va)and I Vf),above pertaining to existing conditions affecting the project site.The project area is located within the boundaries of the County's MSCP which is currently being developed, and therefore, has not yet been adopted. The North County Plan Area encompasses approximately 345,000acres in and around the unincorporated communities of Bonsall, De Luz, Fallbrook, Harmony Grove, Rancho Santa Fe, Lilac, Pala, Pauma Valley, Rainbow, Ramona, Rincon Springs,Twin Oaks Valley,and Valley Center within the County's jurisdiction(CountyofSan Diego n.d.).

Due to the nature of the proposed improvements and the developed character of lands affected by the proposed improvements, the developed nature of surrounding lands, and the lack of sensitive biological resources,the project is not anticipated to conflict with the MSCP. Impacts would be less than significant.

Indirect Effects: No new, unplanned development or change in existing or planned land uses would occur with the proposed infrastructure improvements. Indirect impacts would be less than significant. 45 03/08/2022 C7 57 of 159

Smilax-Mimosa Sewer Improvements Project
XI. MINERAL RESOURCES
New
Significant
Impact due
to Unusual
Circum- No Impact
Impact stances or or Less SPEIR New
Analyzed Substantial than Mitigation Mitigation in the New Significant Measure(s) Measure(s) Would the project: SPEIR Information Impact Applicable Required a) Result in the loss of availability of a known
mineral resource that would be of value ❑ ❑ 0 ❑ ❑ to the region and the residents of the
state?
b) Result in the loss of availability of a
locally- important mineral resource
recoverysite delineated on local ❑ ❑ ■ ❑ ❑ general plan,specific plan or other land
use plan?
a) Result in the loss of availability of a known mineral resource that would be of value to the region and the residents of the state?
The term "mineral resource"refers to a concentration or occurrence of a naturally occurring material in such form or amount that economic extraction of a commodity is currently potentially feasible.

Less than Significant Impact.Mineral resources that would be of future value to the state or region have not been identified in the project area.The County of San Diego General Plan identifies lands potentially affected by the proposed improvements as MRZ-3(County of San Diego 2011).Areas designated as MRZ- 3 have undetermined mineral resource significance;the significance of areas containing mineral deposits cannot be evaluated from available data.

The proposed improvements would not result in the extraction of any mineral resources,and therefore, such resources would remain available for extraction if future mining is indeed proposed. Additionally, the project area is generally surrounded by developed lands supporting single- and multi-family residential uses, which would be incompatible with any future extraction of mineral resources. A future mining operation at the project site would likely create a significant impact to neighboring properties relative to noise,air quality,traffic,and/or other issues.As such, mineral extraction is currently infeasible.

Therefore, project implementation would not result in the loss of availability of a known mineral resource.

Impacts would be less than significant.
b) Result in the loss of availability of a locally important mineral resource recovery site delineated on a local general plan, specific plan, or other land use plan? No Impact. As described above, the project site is located in an area designated as MRZ-3. The proposed improvements would largely occur within existing roadway rights-of-way or within residential properties, within a highly urbanized area (i.e., developed/disturbed lands). No locally important mineral resource recovery sites delineated on a local general plan, specific plan, or other land use plan occur within the project area. Therefore, the loss of availability of any such resources would not occur with project implementation. No impact would occur in this regard.
46 03/08/2022 C7 58 of 159

Smilax-Mimosa Sewer Improvements Project
XII. NOISE
New
Significant
Impact due
to Unusual
Circum- No Impact
Impact stances or or Less SPEIR New
Analyzed Substantial than Mitigation Mitigation in the New Significant Measure(s) Measure(s) Would the project: SPEIR Information Impact Applicable Required a) Result in exposureof personsto or
generation of noise levels in excess of
standards established in the local ■ ❑ ❑ ■ ❑ general plan or noise ordinance,or
applicable standards of other agencies?
b) Result in exposure of persons to or
generation of excessive groundborne ■ ❑ ■ ❑ ❑ vibration orgroundborne noise levels?
c) Result in a substantial permanent
increase in ambient noise levels in the ■ ❑ ■ ❑ ❑ project vicinity above levels existing
withoutthe project?
d) Result in a substantial temporary or
periodic increase in ambient noise levels ■ ❑ ❑ ■ ❑ in the project vicinity above levels
existing without the project?
e) For a project locatedwithin an airport
land use plan or,where such a plan has
not been adopted, within two miles ofa ■ ❑ ■ ❑ ❑ public airport or public use airport,
would the project expose people residing
or working in the project areato
f) For a project within the vicinityofa
private airstrip,would the project expose ■ ❑ ■ ❑ ❑ people residing or working in the project
area to excessive noise levels?
a) Exposure of persons to or generation of noise levels in excess of standards established in the local general plan or noise ordinance, or applicable standards of other agencies? SPEIR Mitigation Measures Applicable.

Direct Effects- Construction: The proposed improvements would result in the generation of noise from operation of construction equipment and vehicles, trenching, pipe and manhole installation and repair, backfilling,and repaving,as appropriate.

The City of Vista adopted the County of San Diego's Noise Control Ordinance by reference,which is enforced throughthe City's Municipal Code.The City's Code limits operational noise generation ata common property line with a residential zone to 50 dBA Leq(1-hour)between 7:00 a.m.and 10:00 p.m.and 45 dBA Leq(1-hour) between 10:00 p.m. and 7:00 a.m. (Municipal Code Chapter 8.32, Noise Control). Construction noise in excess of 75 dBA Leq(8-hour)at residences or between the hours of 7:00 p.m.and 7:00 a.m.of the next day, 47 03/08/2022 C7 59 of 159

Smilax-Mimosa Sewer Improvements Project
on Sundays, or on a holiday is prohibited. Additionally, Chapter 10.24, Noise, of the City of San Marcos Municipal Code restricts noise resulting with the erection or demolition of building,grading or excavation of land, or the start-up and use of heavy equipment such as dump trucks and graders or jackhammers, to Monday through Friday between the hours of 7:00 a.m.and 6:00 p.m.and on Saturdays 8:00 a.m.to 5:00 p.m.(City of San Marcos 2021).

The analysis in the 2017 CSMP SPEIR assumed that during peak excavation and earthwork activities,each individual improvement project identified in the 2017 CSMP may involve up to two construction crews working simultaneously. Construction activities associated with the identified projects would result in a temporary increase in ambient noise levels above existing conditions.Sound levels of typical construction equipment generally range from 70 dBA(A-weighted sound level)to 90 dBA at 50 feet from the source.

When multiple pieces of equipment operate at the same time,combined noise levels increase. However, such noise levels attenuate with increasing distance from the source.

Construction-related noise associated with the 2017 CSMP was determined to have the potential to exceed the thresholds established in the City of Vista Noise Control Ordinance and the County of San Diego Noise Control Ordinance of 75 dBA for more than 8 hours during any 24 hour period; measured at the property line where the noise source is located or on any occupied property where the noise is being received.

Construction and rehabilitation efforts forthe proposed componentswould resultin potential noise impacts to various types of sensitive receptors in the surrounding vicinity (i.e., residential uses). The proposed construction activities would increase ambient noise levels above existing conditions, which may be perceived as annoying to area sensitive receptors. Therefore,short-term noise impacts associated with construction of the 2017 CSMP improvements could potentiallybe significant. Where construction activities occur within 200 feet of noise sensitive land uses,mitigation measure NV-1 of the 2017 CMP SPEIR would be implemented to minimize potential construction noise. Potential impacts would be reduced to less than significant with incorporation of such mitigation. It should also be noted that any temporary noise effects generated by project-related construction would be substantially reduced due tothe existing ambient noise environment influenced by traffic traveling along SR 78.

Vehicle trips associated with delivery of supplies to the staging areas and affected improvement areas, as well as worker-relatedtrips,would be limited and anticipated to generate only minimal and temporary noise on local roadways that may potentially affect nearbysensitive uses.However,it is not anticipated that such activities would result in exceedance of established noise standards. Further, as stated in the 2017 CSMP PSEI R,assuming an average crew size of 15,including inspectors,construction activities could generate up to 60 round-trip personal automobile trips per day for the identified Cl P projects.Compared tothe existing vehicle trips that occur on major arterial,collector,and local roadways within the Cityon a daily basis,the SPEIR found that noise generated by construction traffic associated with the 2017 CSMP would not be discernable.Such impacts would be less than significant.

Direct Effects-Operations:Operational noise may be generated by routine maintenance of the affected infrastructure components over the long-term which may involve on-site improvements, construction worker and deliveryvehicle trips,and use of equipment. However,it is anticipated that system maintenance would occur intermittently and would be short-term and would not substantially differ from existing maintenance and repair activities currently undertaken by the District.As such, noise generated by future maintenance activities is not anticipated to exceed established noise limits for residential properties within the project vicinity and would not result in exposure of sensitive receptors to excessive noise levels.A less than significant impact would occur.

Indirect Effects—The proposed improvements tothe sewer infrastructure system would not indirectly result in population or other area growth that would increase existing noise levels.No indirect noise impacts would occur.
48 03/08/2022 C7 60 of 159

Smilax-Mimosa Sewer Improvements Project
b) Exposure of persons to or generation of excessive groundborne vibration or groundborne noise levels? Less than Significant Impact.

Direct Effects - Construction: Increases in groundborne vibration and noise levels attributable to the proposed improvements would be primarily associated with short-term construction-related activities.

Construction would have the potential to result in varying degrees of temporary groundborne vibration, depending on the specific construction equipment used and the operations involved. Ground vibration generated by construction equipment spreads through the ground and diminishes in magnitude with increases in distance.

Construction-related ground vibration is normally associated with impact equipment such as pile drivers and jackhammers, and the operation of some heavy-duty construction equipment, such as dozers and trucks. Excessive groundborne vibration and noise can result from construction activities such astrenching, uses of vibratory rollers for soil compaction,or blasting.

As evaluated in the 2017 CSMP SPEIR, typically, vibration levels equal to or greater than 0.2 PPV (peak particle velocity)in units of inches per second,or 94 velocity decibel(VdB),are considered significantas that is the level at which building damage may occur to fragile non-engineered timber and masonry structures (Cityof Vista 2017).Vibratory rollers can generate groundborne vibration at 0.210 at a distance of 25 feet; however,the vibration level dissipatesto belowthe threshold by adding only 1 additional foot of separation from the source. Pile driving would not be required for the proposed improvements. Other construction equipment(i.e.,small vibratory plate compactor or hand held equipment)would generate substantially less groundborne vibration than a vibratory roller. It is not anticipated that equipment used for the proposed improvements would result in substantial groundborne vibration levels which exceed 0.2 in/sec PPV or greater at adjacent residences in the affected areas. I mpacts associated with construction equipment are considered to be less than significant based on the speed atwhich groundborne vibration and noisedissipate from the source.

Direct Effects-Operations:Operation of the affected sewer infrastructure would not generate groundborne vibration. Impacts would be less than significant.

Indirect Effects—The proposed improvements would not result in indirect effects that would generate substantial groundborne vibration levels.No indirect vibration impacts would occur. c) Result in a substantial permanent increase in ambient noise levels in the project vicinity above levels existing without the project?
Less than Significant Impact. Referto Response XI I(a),above. Limited noise maybe generated by periodic maintenance activities in routine investigations and/or repair. However, such activities would not be anticipated to exceed allowable noise thresholds adopted for residential properties s identified in the City's Noise Ordinance. Further,all maintenance work, including routine or emergency repairs,would be subject to conformance with the City's Noise Ordinance,and incorporation of noise-reduction measures(i.e., use of sound blankets or temporary noise screens) if appropriate to minimize disturbance to adjacent properties. I mpacts would be less than significant.
d) A substantial temporary or periodic increase in ambient noise levels in the project vicinity above levels existing without the project?
SPEIR Mitigation Measures Applicable.

Direct Effects — Construction: Refer to Response XII(a), above. Project construction may temporarily generate noise levels in excess of standards setforth in the City's Noise Ordinance. Mitigation measure NV-1, as identified in the 2017 CSMP SPEIR, would be implemented to reduce potential project- generated construction noise.
49 03/08/2022 C7 61 of 159

Smilax-Mimosa Sewer Improvements Project
Direct Effects—Operation:Refer to Response XII(a),above.

Indirect Effects:Refer to Response XI I(a),above.
e) For a project located within an airport land use plan or, where such a plan has not been adopted, within two miles of a public airport or public use airport, would the project expose people residing or working in the project area to excessive noise levels?
No Impact.The project area is not located within the boundaries of an airport land use plan. The nearest airport to the site is the McClellan-Palomar Airport, located approximately 4.4 miles to the southwest.

Additionally,the Oceanside Municipal Airport is located approximately9.1 miles tothe northwest,andthe U.S. Marine Corps Air Station Camp Pendleton lies approximately 12.7 miles to the northwest of the site.

The project would therefore not expose people residing or working in the area to excessive noise levels,due to distance from any public airports. No impact would occur. f) For a project within the vicinity of a private airstrip, would the project expose people residing or working in the project area to excessive noise levels?
No Impact.There are no private airstrips located in the vicinity of the project site. Therefore, no impact would occur relativetothis issue.

Applicable Mitigation Measures
2017 CSMP SPEI R Mitigation Measure NV-1:Construction Noise Reduction Measures.

The Construction Contractor shall demonstrate to the satisfaction of the City Engineer that the following noise control techniques are implemented during the clearing,demolition,grading and construction phases of projects identified in the 2017 CSMP within 200 feet of noise-sensitive land uses. • Heavy equipment repair and contractor staging shall be conducted at sites as far as practical from nearby residences.
• Construction equipment, including vehicles, generator and compressors, shall be maintained in proper operating condition and shall be equipped with manufacturers' standard noise control devices or better(e.g., mufflers,acoustical lagging,and/or engine enclosures). • Temporary sound barriers (or curtains), stockpiles or excavated materials, or other effective shielding or enclosure techniques shall be used where construction noise would exceed 90 dBA within less than 50 feet from a noise sensitive receptor. • Construction work, including on-site equipment maintenance and repair, shall be limited to the hours specified in the noise ordinance of the affected jurisdiction(s). • Electrical power shall be supplied from commercial power supply, wherever feasible, in order to avoid or minimize the use of engine-driven generators.
• Electrically powered equipment shall be used instead of pneumatic or internal-combustion powered equipment,where feasible.
• Unnecessary idling of internal combustion engines(i.e.,in excess of 5 minutes)shall be prohibited. • Operating equipment shall be designed to comply with all applicable local,state, and federal noise regulations.
• Construction site and access road speed limits shall be established and enforced during the construction period.
• If lighted traffic control devices are to be located with 500 feet of residences,the devices shall be powered by batteries,solarpower,or similarsources,and not be an internal combustion engine. 50 03/08/2022 C7 62 of 159

Smilax-Mimosa Sewer Improvements Project
• The use of noise-producing signals,including horns,whistles,alarms,and bells, shall be for safety warning purposes only.
• No project-related public address or music system shall be audible at any adjacent sensitive receptor.
• The construction contractors shall provide advance notice, between 2 and 4 weeks prior to construction, by mail to all residents or property owners within 200 feet of the alignment. The announcement shall state specifically where and when construction will occur in the area. If construction delays or more than seven days occur, an additional notice shall be made, either in person or by mail. The City shall publish a notice of impending construction on the City webske, stating when and where construction will occur.
• The construction contractors shall identify and provide a public liaison person before and during construction to respond to concerns of neighboring residents about noise and other construction disturbance.The construction contractors shall also establish a program for receiving questions or complaints during construction and develop procedures for responding to callers. Procedures for reaching the public liaison officer via telephone or in person shall be included in notices distributed to the public in accordance with the information above.

XIII. POPULATION AND HOUSING
New
Significant
Impact due
to Unusual
Circum- No Impact
Impact stances or or Less SPEIR New
Analyzed Substantial than Mitigation Mitigation in the New Significant Measure(s) Measure(s) Would the project: SPEIR Information Impact Applicable Required a) Induce substantial population growth
inan area,e ithe r directly(for example,
by proposing new homes and ❑ ❑ 0 ❑ ❑ businesses)or indirectly(for example,
through extension of roads or other
infrastructure)?
b) Displace substantial numbersof
existing housing,necessitating ❑ ❑ 0 ❑ ❑ the constructionof replacement
housing elsewhere?
c) Displace substantial numbers of
people, necessitatingthe ❑ ❑ 0 ❑ ❑ construction of replacement housing
elsewhere?
a) Induce substantial population growth in an area, either directly (for example, by proposing new homes and businesses)or indirectly(for example,through extension of roads or other infrastructure)? No Impact.The proposed improvements to the existing sewer infrastructure system are intended to ensure the continued provision of adequate wastewater services tothe District's service population,consistentwith that intended bythe 2017 CSMP.The proposed improvements would not induce substantial area population growth, either directly or indirectly. No impact would occur in this regard. 51 03/08/2022 C7 63 of 159

Smilax-Mimosa Sewer Improvements Project
b) Displace substantial numbers of existing housing, necessitating the construction of replacement housing elsewhere?
No Impact.The majority of the proposed improvements would occur within existing rights-of-way; limited improvements would occur within existing easements and/or on privately owned residential properties.

However,the project would not result in the displacement of any existing housing,and no construction of replacement housing is required. No impact would occur. c) Displace substantial numbers of people, necessitating the construction of replacement housing elsewhere?
No Impact.The majorityof the proposed improvements would occurwithin existing rights-of-way; limited improvements would occur within existing easements and/or on privately owned residential properties.

However, the project would not result in the displacement of any people, and no construction of replacement housing is required. No impact would occur.

XIV. PUBLICSERVICES
New
Significant
Impact due
to Unusual
Circum- No Impact
Impact stances or or Less SPEIR New
Analyzed Substantial than Mitigation Mitigation in the New Significant Measure(s) Measure(s) Would the project: SPEIR Information Impact Applicable Required Result in substantial adverse physical impacts associated withthe provision of new or physically altered governmental facilities,need for new or physically altered governmental facilities,the construction of which could cause significant environmental impacts,in orderto maintain acceptable service ratios,responsetimes orother performance objectivesfor anyof the public services:
a) Fire protection? ❑ ❑ ■ ❑ ❑ b) Police protection? ❑ ❑ ■ ❑ ❑ c) Schools? ❑ ❑ ■ ❑ ❑
d) Parks? ❑ ❑ ■ ❑ ❑
e) Other publicfacilities? ❑ ❑ ■ ❑ ❑ a) Fire protection?
b) Police protection?
c) Schools?
d) Parks?
e) Other public facilities?
XIV.a)No Impact.The City of Vista Fire Department and Vista Fire Protection District provide fire protection services to the project site and surrounding community.The Vista Fire Department serves the residents of the City of Vista and the Vista Fire Protection District.The Fire Department is a full service department, providing services including fire prevention and suppression, emergency medical services, and technical rescue and hazardous materials mitigation.The Fire Department oversees and administersthe contractwith 52 03/08/2022 C7 64 of 159

Smilax-Mimosa Sewer Improvements Project
the Vista Fire Protection District and provides support tothe District Board, advisingthem on policy and procedures(City of Vista n.d.).

The Fire Department operates six strategically located fire stations.Vista Station Number 4, located at 2121 Thibodo Road,Vista,a pproximately0.7 miles northwest oft he projects ite,provides fire protections ervices to the project area.

Construction activities would be short term and the need for fire protection services is not anticipated,due tothe nature of the project.Once the sewer infrastructure is fully operational,all such improvements would be underground,and would therefore not be anticipated to pose a potential fire risk. The proposed project does not include new homes or other land uses that would require additional fire protection services or that would adverselyaffect local response times for emergency vehicles.

The project would not result in substantial adverse physical impacts associated with the provision of new or physically altered governmental facilities or the need for new or physically altered governmental facilities, the construction of which could cause significant environmental impacts, in order to maintain acceptable service ratios,response times, or other performance objectives for fire protection services.Therefore, no impact would occur relative to fire protection.

XIV.b)No Impact. Police protection services for the project area are provided by the San Diego County Sheriff's Department,which is under contract with the City.The sheriff's department operatesfrom its main station located at 325 South Melrose Drive,Suite 210, approximately3.4 miles northwest of the proposed project site.

Construction activities would be short term and the need for law enforcement services is not anticipated, due to the nature of the project.Once the sewer infrastructure is fully operational,all such improvements would be underground,and would therefore not be a nticipated to pose a risk for vandalism or other security risk.The proposed project does not include new homes or other land uses that would require additional law enforcement services orthat would adversely affect local response times in the event of an emergency.

The project would not result in substantial adverse physical impacts associated with the provision of new or physically altered governmental facilities or the need for new or physically altered governmental facilities, the construction of which could cause significant environmental impacts, in order to maintain acceptable service ratios,response times,or other performance objectivesfor police protection services.Therefore,no impact would occur relative to police protection.

XIV.c)No Impact.The project would not change existing demand for school services,as the project would not result in an increase in area population.Therefore,the project would have no impact related to school services.

XIV.d)No Impact.The project would not result in an increase in area population and would not prompt the need for new or altered parks.Therefore,the project would have no impact related to parks.

XIV.e)No Impact.The project would not result in an increase in area population and would not prompt the need for new or altered other public services,such as libraries.Therefore,the project would have no i mpact in this regard.
53 03/08/2022 C7 65 of 159

Smilax-Mimosa Sewer Improvements Project
XV. RECREATION
New
Significant
Impact due
to Unusual
Circum- No Impact
Impact stances or or Less SPEIR New
Analyzed Substantial than Mitigation Mitigation in the New Significant Measure(s) Measure(s) Would the project: SPEIR Information Impact Applicable Required a) Increasethe use ofexisting neighborhood
and regional parks or other recreational
facilities such thatsubstantial physical ❑ ❑ ■ ❑ ❑ deterioration of the facilitywould occur
or be accelerated?
b) Does the project include recreational
facilities or require the construction or
expansion of recreational facilities which ❑ ❑ 0 ❑ ❑ might have an adverse physical effect on
the environment?
a) Increase the use of existing neighborhood and regional parks or other recreational facilities such that substantial physical deterioration of the facility would occur or be accelerated? No Impact.The proposed project would not result in improvements that would generate an increase in area population that would,in turn, have the potential to increase demand for recreational resources within the service area.Therefore,the project would not be anticipated to increase the use of existing neighborhood or regional parks or other recreational facilities such that substantial physical deterioration of the facility would occur or be accelerated.No impact would occur.
b) Does the project include recreational facilities or require the construction or expansion of recreational facilities which might have an adverse physical effect on the environment? No Impact. Due to the nature of the proposed sewer infrastructure improvements,the project does not include recreational facilities, nor does it require the construction or expansion of recreational facilities, which might have an adverse physical effect on the environment. No impact would occur in this regard. 54 03/08/2022 C7 66 of 159

Smilax-Mimosa Sewer Improvements Project
XVI. TRANSPORTATION AND CIRCULATION
New
Significant
Impact due
to Unusual
Circum- No Impact
Impact stances or or Less SPEIR New
Analyzed Substantial than Mitigation Mitigation in the New Significant Measure(s) Measure(s) Would the project: SPEIR Information Impact Applicable Required a) Conflictwith an applicable plan,ordinance
or policy establishing measures of
effectiveness for the performance ofthe
circulation system,taking into account all
modes of transportation including mass
transit and non-motorized travel and ■ ❑ ■ ❑ ❑ relevant components of the circulation
system, including but not limited to
intersections,streets, highways and
freeways,pedestrian and bicycle paths,
and mass transit?
b) Conflict with an applicable congestion
management program,including,but not
limited to level of service standards and
travel demand measures,orother ■ ❑ ❑ ■ ❑ standards established by the county
congestion management agency for
designated roads or highways?
c) Result in a change in air traffic patterns,
including either an increase in traffic ■ ❑ ■ ❑ ❑ levels or a change in location that results
in substantial safetyrisks?
d) Substantially increase hazards dueto
a design feature(e.g.,sharp curves or
dangerous intersections)or ■ ❑ ❑ ■ ❑ incompatible uses(e.g.,farm
equipment)?
e) Result in inadequate emergency access? ■ ❑ ❑ ■ ❑ f) Conflict with adopted policies,plansor
programs regarding publictransit,
bicycle,or pedestrian facilities,or ■ ❑ ❑ ■ ❑ otherwise decrease the performance or
safety of such facilities?
a) Conflict with an applicable plan, ordinance or policy establishing measures of effectiveness for the performance of the circulation system,taking into account all modes of transportation including mass transit and non-motorized travel and relevant components of the circulation system,including but not limited to intersections, streets, highways and freeways,pedestrian and bicycle paths, and mass transit?
Less than Significant Impact.
55 03/08/2022 C7 67 of 159

Smilax-Mimosa Sewer Improvements Project
Direct Effects—Construction:The North County Transit District operates its BREEZE bus service within the City of Vista. Route 332 runs along Sycamore Avenue, La Mirada Drive, and Poinsettia Avenue to the northwest/southwest/south; Route305 runs along South Santa Fe Avenue/Mission Road tothe north/east.

Due to distance from the area where improvements are proposed,project construction would not interfere or conflict with the provision of BREEZE bus services(NCTD2021).

No designated bicycle lanes are present along Mimosa Avenue in the area where improvements are proposed, nor along other streets where other infrastructure improvements(maintenance)would occur.An existing sidewalk segment (approximately 250 feet in length with no connection to other sidewalks) is present along the west side of Mimosa Avenue in the western portion of the alignment affected by the improvements and along both sides of Smilax Avenue; sidewalks are not present along other roadways affected by the proposed improvements. Temporary sidewalk closure of the sidewalk along Mimosa Avenue may be required; however, as it does not provide connection to a larger pedestrian network, temporary closure is not anticipated to disrupt pedestrian movement in the area or decrease the performance or safetyof such facilities.

Due to the limited and short-term nature of the proposed improvements,and the lack of access to public transit or other non-motorized travel(pedestrian and bicycle movement)in the affected area,the proposed improvements are not anticipated to conflict with an applicable plan, ordinance or policy establishing measures of effectiveness for the performance of the circulation system; refer also to Response XVI(fl, below. Impacts would be less than significant.

Direct Effects—Operations:The proposed sewer infrastructure improvements would be undergrounded and operations would not directly affect surface circulation systems once construction is completed. No impact would occur.

Indirect Effects:Due tothe nature of the proposed sewer infrastructure improvements and the condition that such improvements would be undergrounded, no indirect effects are anticipated. No impact would occur.
b) Conflict with an applicable congestion management program, including, but not limited to level of service standards and travel demand measures, or other standards established by the county congestion management agency for designated roads or highways? SPEIR Mitigation Measures Applicable.

Direct Effects- Construction: All improvements would occur along existing sewer line alignments within existing public easements or roadway rights-of-way either currently under District ownership or other affected agencies,with exception of limited segments within the Coral Tree Manor and Springdale Estates developments which are located within easementson privatelyowned property.

Construction-related activities would have the potential to result in temporary disruption to circulation along public streets due to the proposed improvements that may require partial street or lane closures,as well as temporary disruption of access to residences and businesses along the construction route. The Districtwould maintain,to the extent feasible,safe and adequate pedestrian and vehicular access;however, if access is blocked by construction,an alternative access route would be provided. Mitigation measure TR- 1 is proposed to address temporary, construction-related impacts to the circulation network through the preparationofa project-specific traffic control plan.

As stated in the 2017CSMPSPEIR,the analysis assumed that, based on trip generation characteristics,each improvement project may require up to two construction crews of 15 persons each generating up to 60 personal commute round trips per day, as well as up to 10 daily haul trucks trips to accommodate the delivery of construction materials and equipment and/or soil import/export(City of Vista 2017a).The SPEIR determined that under this scenario, the improvement projects identified would not result in significant impacts to roadway operations or capacity. Therefore, it is anticipated that the traffic generated by 56 03/08/2022 C7 68 of 159

Smilax-Mimosa Sewer Improvements Project
construction of the proposed improvements would be consistent with that analyzed in the SPEIR; construction impacts in this regard would be less than significant.

Direct Effects-Operations:Once construction is completed,affected roadways would be returnedtotheir prior condition to ensure that the proposed improvements do not result in any permanent effects to area circulation. Due to the nature of the proposed improvements and operational characteristics, the project would not conflict with an applicable congestion management program,or plan,ordinance,or policy related to the performance of the circulation system.Impactswould be less than significant.

Indirect Effects:During construction,area traffic mayavoid Mimosa Avenue andtherefore be redistributed within the area; however, affected roads are generally low volume and any temporary redistribution of traffic would not be anticipated to adversely affect other area roadways and/or intersections. Indirect impacts are considered lessthan significant in this regard. c) Result in a change in air traffic patterns, including either an increase in traffic levels or a change in location that results in substantial safety risks?
No Impact.The proposed infrastructure improvements would occur underground and no physical structures are proposed that would affect air traffic patterns,cause an increase air traffic,or causea change in location that would result in potential safety risks.No impact would occur. d) Substantially increase hazards due to a design feature(e.g.,sharp curves or dangerous intersections) or incompatible uses(e.g.,farm equipment)?
SPEIR Mitigation Measures Applicable.

Direct Effects-Construction:During construction,temporary lane closures maybe required to allow for the proposed improvements within the affected right-of-way.To ensure public safety and minimize potential safety hazards,mitigation measureTR-1,as identified in the 2017 CSMP SPEIR,would require preparation and implementation of a Traffic Control Plan for roadways and intersections affected by the proposed project. Implementation of mitigation measure TR-1 would reduce potential impacts to less than significant.

Direct Effects-Operations:The proposed improvements would not include new permanent design features or incompatible uses that would adversely affect vehicular or other means of transportation on affected roadways.Additionally,as the improvements would be installed underground, no physical design features or incompatible uses that could decrease public safetywould result. Impacts are considered to be less than significant.

Indirect Effects: Due to the nature of the proposed infrastructure improvements(underground),the project would not include installation of any roadway design features(e.g.,sharp curves or dangerous intersections) or incompatible uses that would increase safety hazards. However, construction-related traffic may temporarily affect vehicular(including buses), bicycle,and pedestrian movement along affected roadways, thereby potentially affecting public safetyor restricting or delaying access to existing land uses. Mitigation measure TR-1 of the CSMP SPEI R would be implemented to reduce potential safety hazards by requiring the preparation of a project-specific Traffic Control Plan prior to the start of construction. Impacts would be reduced to less than significant with mitigation incorporated. e) Result in inadequate emergency access?
SPEIR Mitigation Measures Applicable.

Direct Effects-Construction: Project construction would result in disturbance within the roadway right-of- way that may temporarily affect emergency access. Such activity may require lane closures and/or a reduction in the width of travel ways during the construction phase.Implementation of mitigation measure TR-1, as identified in the 2017 CSMP SPEIR, would be required to reduce potential impacts on emergency access to less than significant.
57 03/08/2022 C7 69 of 159

Smilax-Mimosa Sewer Improvements Project
Direct Effects - Operations: The proposed sewer infrastructure improvements would be located underground. No direct effects on emergency access would therefore result. No impact would occur in this regard.

Indirect Effects:The proposed infrastructure improvements would be located underground. No indirect effects on emergency access would therefore result.No impact would occur in this regard. fJ Conflict with adopted policies, plans, or programs regarding public transit, bicycle, or pedestrian facilities,or otherwise decrease the performance orsafety of such facilities? SPEIR Mitigation Measures Applicable.

Direct Effects-Construction:Refer to Response XVI(a),above. The proposed improvements may result in reduced travel width of roadways and sidewalks within the project area.Alternative means of transportation and circulation patterns in proximity to the project area may therefore be temporarily affected and may include direct disruption of bus service or pedestrian or bicycle access on adjacent lands or roadways.

Mitigation measureTR-1 is proposed to address temporary access for alternative transportation modes and would reduce potential impacts to less than significant. With incorporation of such mitigation, the project would not conflict with adopted policies, plans,or programs regarding publictransit,bicycle,or pedestrian facilities,or otherwise decrease the performance or safety of such facilities.

Direct Effects - Operations: The proposed improvements would be underground and the proposed improvements would function similar to existing sewer infrastructure maintained by the District. Impacts would be less than significant.

Indirect Effects:The proposed infrastructure improvements would be located underground. No indirect effects on public transit, bicycle, pedestrian facilities or other such transportation systems would therefore result. No impact would occur in this regard.

Applicable SPEIR Mitigation Measures
2017 CSMPSPEIR Mitigation MeasureTR-1: Prepare and Implementa Traffic Control Plan.The construction contractor shall prepare a Traffic Control Plan for roadways and intersections affected by individual 2017 CSMP improvements for approval by the District Engineer.The Traffic Control Plan shall include, but not be limited to,the following elements based on local site and roadway conditions:
• Provide street layout showing location of construction activity and surrounding streets to be used as detour routes, including "special signage." Post a minimum 72-hour advance warning of construction activities within affected roadways to allow motoriststo select alternative routes. • Restrict delivery of construction materials to non-peak travel periods (9:00 a.m. — 3:00 p.m.)as appropriate.Weekend and night workshifts will be allowed in non-residential areasonly. • Maintainthe maximum travel-lane capa city during non-construction periods and provide flagger- control at construction sites to manage traffic control and flows. • Limit the construction work zone in each block to a width that,at a minimum, maintains alternate one-way traffic flow past the construction zone.
• Maintain access for driveways and private roads,except for brief periods of construction,in which case property owners will be notified.
• Require temporary steel-plate trench crossings, as needed, to maintain reasonable access to homes, businesses,and streets.When required by the applicable encroachment permit, maintain the existing lane configuration during nonworking hours by covering the trench with steel plates or by using temporary backfill.
• Require appropriate warning signage and safety lighting for construction zones. 58 03/08/2022 C7 70 of 159

Smilax-Mimosa Sewer Improvements Project
• Access for emergency vehicles sha I I be maintained at a I It imes. Police,fire,and emergency services shall be notified of the timing, location, and duration of construction activities that could hinder and/or delay emergency access through the construction period. • Coordinate with NCTD to plan,as needed,fort he temporary relocation of bus stops and/or detour of transit routes on affected pipeline alignments.
• Identify detours, where available, for bicyclists and pedestrians in areas potentially affected by project construction.
• Provide adequate off-street parking locations for workers'vehicles and construction equipment in those areas where on-street parking availability is insufficient. • Repair and restore the roadway ROW to its original conditions or better upon completion of work.

XVII. UTILITIES AND SERVICE SYSTEMS
New
Significant
Impact due
to Unusual
Circum- No Impact
Impact stances or or Less SPEIR New
Analyzed Substantial than Mitigation Mitigation in the New Significant Measure(s) Measure(s) Would the project: SPEIR Information Impact Applicable Required a) Exceed wastewate r treatment
requirements of the applicable ❑ ❑ ■ ❑ ❑ Regional Water Quality Control Board?
b) Require orresult in the construction of
newwater or wastewater treatment
facilities or expansion of existingfacilities, ❑ ❑ ■ ❑ ❑ the construction ofwhich could cause
significant environmental effects?
c) Require or result in the construction of
new stormwater drainage facilities or
expansion of existing facilities,the ❑ ❑ ■ ❑ ❑ construction of which could cause
significant environmental effects?
d) Have sufficient water supplies available
to serve the project from existing ❑ ❑ ■ ❑ ❑ entitlements and resources,or are new
or expanded entitlements needed?
e) Result in a determination by the
wastewater treatment providerwhich
serves or may serve the projectthat it has ❑ ❑ ■ ❑ ❑ adequate capacity to servethe project's
projected demand in addition to the
f) Be served by a landfill with sufficient
permitted capacity to accommodate ❑ ❑ ■ ❑ ❑ the project's solid waste disposal
needs?
59 03/08/2022 C7 71 of 159

Smilax-Mimosa Sewer Improvements Project
New
Significant
Impact due
to Unusual
Circum- No Impact
Impact stances or or Less SPEIR New
Analyzed Substantial than Mitigation Mitigation in the New Significant Measure(s) Measure(s) Would the project: SPEIR Information Impact Applicable Required g) Comply with federal,state,and local
statutes and regulations related to solid ❑ ❑ ❑ waste?
a) Exceed wastewater treatment requirements of the applicable Regional Water Quality Control Board? Less than Significant Impact. The project is intended to provide improvements to the existing sewer infrastructure system and would not generate new population growth or substantially increase demand for wastewater services that would exceed wastewater treatment requirements of the applicable Regional Water Quality Control Board.The project would be consistent with infrastructure improvements identified in the 2017 CSMP to address needed enhancements to the sewer system to ensure that adequate wastewater service can be maintained by the District over the long term. Impacts would be less than significant.
b) Require or result in the construction of new water or wastewater treatment facilities or expansion of existing facilities,the construction of which could cause significant environmental effects? Less than Significant Impact. The Encina Wastewater Authority's Water Pollution Control Facility accommodates wastewater that flows through the sewer infrastructure affected by the proposed improvements.The facility has adequate capacityto accommodate existing and projected flows within the infrastructure elements affected by the project (City of Vista 2017b). The proposed improvements would not generate new area population growth that would create new demands for water or wastewater treatmentfacilitiesor expansion of existing facilities,and would instead serve the same service area as under existing conditions. Impacts would be less than significant. c) Require or result in the construction of new stormwater drainage facilities or expansion of existing facilities,the construction of which could cause significant environmental effects? No Impact.The proposed improvements would not require the construction of new stormwater drainage facilities or expansion of existing facilities.Any areas disturbed bythe project would be restored to existing conditions once construction is complete.The project would not result in an increase in stormwater runoff that would require new drainage facilities.No impact would occur. d) Have sufficient watersupplies available to serve the project from existing entitlements and resources, or are new or expanded entitlements needed?
No Impact. Due to the nature of the project (sewer infrastructure improvements), the proposed improvements would not generate the need for domestic water supplies. No impact would occur relative to this issue.
60 03/08/2022 C7 72 of 159

Smilax-Mimosa Sewer Improvements Project
e) Result in a determination by the wastewater treatment provider which serves or may serve the prgfect that it has adequate capacity to serve the project-s projected demand in addition to the provider's existing commitments?
No Impact.See Response XVI I(a),above.The project would result in improvements to the District's existing sewer infrastructure system in conformance with the intent of the 2017 CSMP to ensure that adequate wastewater service can continue to be provided over the long term to District customers. No increase in area population or demand for wastewater treatment services would occur as a result of the proposed improvements. As such, the project would not adversely affect the capacity of the District to serve the provider's existing commitments. No impact would occur. f) Be served by a landfill with sufficient permitted capacity to accommodate the project's solid waste disposal needs?
Less than Significant Impact. The City of Vista is served by the Sycamore Landfill, located at 8514 Mast Boulevard in San Diego.The landfill has a maximum permitted throughput of 5,000 tons of solid waste per day and a remaining capacityof 113,972,637 cubic yards(Ca lRecycle 2019).

Due to the nature of the project, on-site construction and maintenance activities may generate a limited amount of solid waste(e.g.,removed asphalt or soils).As such,anywaste generated would be minimal and would not exceedthe permitted capacityof Sycamore Landfill. g) Comply with federal,state,and local statutes and regulations related to solid waste? Less than Significant Impact.The project would be required to comply with applicable federal, state, and local statutes and regulations related to solid waste disposal, including disposal of any construction waste.

Impacts would be less than significant.
61 03/08/2022 C7 73 of 159

Smilax-Mimosa Sewer Improvements Project
XVIII. MANDATORY FINDINGS
New Significant
Impact due to No Impact
Impact Unusual Circum- or Less SPEIR New
Analyzed stances or than Mitigation Mitigation
in the Substantial New Significant Measure(s) Measure(s) Environmental Issue Area: SPEIR Infnrmatinn Impact Applicable Required a) Doesthe project havethe
potential to degradethe quality
of the environment,substantially
reduce the habitat of a fish or
wildlife species,cause a fish or
wildlife population to drop below
self-sustaining levels,threatento ❑ ❑ ❑ ■ ❑ eliminate a plant or animal
community,reduce the numberor
restrictthe range of rare or
endangered plant or animal or
eliminate important examples of
the major periods of California
history or prehistory?
b) Does the project have impacts
that are individually limited,but
cumulatively considerable?
("Cumulatively considerable"
meansthatthe incremental
effects of a project are ❑ ❑ ■ ❑ ❑
considerable when viewed in
connectionwith the effects of
past projects,the effects of
current projects,and the effects
of probable future projects)?
c) Does the project have
environmental effects which
would cause substantial adverse ❑ ❑ ❑ ■ ❑ effects on human beings,either
directly or indirectly?
a) Have the potential to degrade the quality of the environment, substantially reduce the habitat of a fish or wildlife species,cause a fish or wildlife population to drop belowself-sustaining levels,threaten to eliminate a plant or animal community, reduce the number or restrict the range of a rare or endangered plant or animal or eliminate important examples of the major periods of California history or prehistory?
SPEIR Mitigation Measures Applicable.

Due to the developed/disturbed nature of the area affected bythe proposed improvements,and the general absence of biological resources on the site(s), the proposed improvements would have a low potential to degrade the quality of the environment,substantially reduce the habitat of a fish or wildlife species,cause a fish or wildlife population to drop below self-sustaining level, threaten to eliminate a plant or animal community, or restrict the range of a rare or endangered plant or animal. The proposed improvements would implement 2017CSMPSPEIR mitigation measure 1310-1toavoid potential impacts that mayoccurto breeding birds protected under the M BTA a nd that may nest is nearby ornamental trees during construction. 62 03/08/2022 C7 74 of 159

Smilax-Mimosa Sewer Improvements Project
Similarly,due tot he developed/disturbed nature oft he affected lands,it is not anticipated that the proposed improvements would eliminate important examples of the major period of California history or prehistory.

Through implementation of the above-identified mitigation, impacts would be less than significant. b) Have impacts that are individually limited, but cumulatively considerable? ("Cumulatively considerable"means that the incremental effects of a project are considerable when viewed in connection with the effects of past projects,the effects of current projects,and the effects of probable future projects)?
Less than Significant Impact.The proposed improvements are located within a highly urbanized area and substantial new development projects are not anticipated to occur in the vicinity. Due to the limited scope of the proposed improvements and short-term construction period, combined with a lack of potential impacts resulting with operations, cumulatively considerable impacts are not anticipated when such improvements are considered in connection with other projects.The proposed improvements identified in the 2017 CSMP would be required to implement mitigation measures from the 2017 CSMP SPEIR, as appropriate,therebyfurther reducing potentially significant impacts. Impacts inthis regard are considered to be less than significant.
c) Have environmental effects which would cause substantial adverse effects on human beings, either directly or indirectly?
SPEIR Mitigation Measures Applicable.

Potential impacts resultingfrom the release of hazardous materials, impairment of emergency access,and generation of noise during the temporary construction period would have the potential to adversely affect human beings. Compliance with standard regulations and implementation of the mitigation measures identified herein,consistent with the 2017 CSMP SPEI R,would reduce impacts to lessthan significant levels.

Standard construction controls and safety procedures would be implemented during construction to minimize potential associated with exposure to hazardous materials such as oils, fuels, hydraulic fluids, and/or solvents used during construction. Mitigation measure HAZ-1 from the 2017 CSMP SPEIR would be implemented to reduce potential impacts associated with any undocumented contaminated soils and/or groundwater that may be encountered during excavation activities. Additionally, implementation of mitigation measure TR-1 from the 2017 CSMP SPEIR would ensure that sufficient emergency access is maintained along affected roadways during construction. Implementation of mitigation measure NV-1from the 2017 CSMP SPEIR would reduce potential construction noise levels at nearby residential uses to within limits identified in the City's noise ordinance. Incorporation of these mitigation measures would ensure that the proposed improvements would not have potential environmental effects that maycause a substantial adverse effect on human beings. Impacts would be reduced to less than significant. 63 03/08/2022 C7 75 of 159

Smilax-Mimosa Sewer Improvements Project

3.0 REFERENCES
CDC(California Department of Conservation).2018.California Important Farmland Finder. https:Hmaps.conservation.ca.gov/DLRP/ClFF/.

Calfire(CaIifornia Department of Fire and Forestry Resources).2021. FHSZViewer. https:Hegis.fire.ca.gov/FHSZ/.

Cal Recycle(California Depart mentofResources Recycling and Recovery).2019.Solid Waste Information System Facility Detail:Sycamore Landfill(37-AA-0023).
https://www2.caIrecycIe.ca.gov/SolidWaste/SiteActivity/Details/1798?siteI D=2871.

Caltrans(California Department of Transportation). 2018.California State Scenic Highway System Map. https:Hcaltrans.maps.arcgis.com/apps/webappviewer/index.html?id=465dfd3d807c46cc8e8O57116flaa caa.

CDFW(California Department of Fish and Wildlife). 2021.CNDDB Quickview Tool in BIOS. https:Happs.wildlife.ca.gov/bios/?tool=cnddbQuick.

CNPS(California Native Plant Society).2021. Rare Plant Program,Inventory of Rare and Endangered Plants of California(online edition,v9-01 1.0). https://www.rareplants.cnps.org .

DTSC(California Department of Toxic Substances Control).2021. Envirostor Database. https://www.envirostor.dtsc.ca.gov/public/ma p/?myaddress--vista+ca+mimosa+drive.

Geocon, Inc.2021.Geotechnical Investigation-Smilax-Mimosa Sewer Improvements(CI P 8301).

Michael Baker International.2022.Cultural Resources Memorandum.

NCTD(North CountyTransit District).2021.System Map. https:Hgonctd.com/wp- content/uploads/2021/04/System-Ma p-April-2021-for-Web.pdf.

SANDAG(San Diego Association of Governments).2003. Multiple Habitat Conservation Program (Final MHCP Executive Summary).
https://www.sandag.org/programs/environment/habitat_preservation/mhcp_exec_sum.pdf .

San Diego,Countyof. 2011.General Plan Update Final Program EIR. https://www.sandiegocounty.gov/content/sdc/pds/gpupdate/environmentaI.htm1 . . Planning and Development Services. North County Plan. n.d. (no date). https://www.sandiegocounty.gov/content/sdc/pds/mscp/nc/overview.htmI#pla noverview.

San Marcos,Cityof. 2012.General Plan. https://www.san-marcos.net/departments/development- services/planning/genera I-plan.
.2021(current as of March 31). Municipal Code.Chapter 10.24, Noise. https:Hlibra ry.municode.com/ca/sa n_marcos/codes/code_of_ordina nces?node I d=TIT10PUSAMOWE_CH

10.24NO.

SWRCB(State Water Resources Control Board).2021.Geotracker Database. https:Hgeotracker.waterboards.ca.gov/map/?CM D=runreport&myaddress=mimosa+avenue+vista+ca.

USFWS(US Fish and Wildlife Service). 2021. National Wetlands Inventory. https://www.fws.gov/wetlands/data/Mapper.html .

Vista,Cityof.2008. Program Environmental Impact Reportforthe Cityof Vista 2007 Sewer Master Plan Update(SCH#2007091072).
2011a.Vista General Plan 2030 Update.
2011b.Vista General Plan 2030 Update Draft Program Environmental Impact Report. 64 03/08/2022 C7 76 of 159

Smilax-Mimosa Sewer Improvements Project
2017a.Supplemental Program Environmental I mpact Report for Comprehensive Sewer Master Plan Update(SCH#2007091072).
2017b.Comprehensive Sewer Master Plan Update.
n.d. (no date). Fire Department. https://www.cityofvista.com/residents/fire-department . 65 03/08/2022 C7 77 of 159

Smilax-Mimosa Sewer Improvements Project

4.0 LIST OF PREPARERS
City of Vista
John Conley Director of Community Development and Engineering Michael Hilker Capital Projects Manager
Michael Baker International
Carlos Mendoza, PE Civil Engineer/Project Manager Bob Stark, AICP Environmental Project Manager/Quality Assurance Nicole Marotz, AICP, LEED AP Senior Environmental Planner Margo Nayyar Senor Associate/Cultural Resources Department Manager Supporting Technical Studies
Cultural Resources Memorandum
Michael Baker International Susan Zamudio-Gurrola, MHP Kholood Abdo, RPA
Geotechnicol
GEOCON, Inc. Yong Wang, GE
Michael C. Ertwine, CEG
66 03/08/2022 C7 78 of 159

APPENDIX A:

BIOLOGICAL RESOURCES
03/08/2022 C7 79 of 159

10/28/21,9:31 PM BIOS viewer 5.96.99
CALIFORNIA DEPARTMENT OF Welcome Guest! Register Log in FISH and WILDLIFE BIOS*
er.f
Obt
ti' g�fi
�4
V

SAN MARCOS
yi ' A-
TF
Q
SanGIS, Esfl, HERE P95nGI
https://apps.,Qc Mti 2022tool=cnddbQ,ick C7 80 of 159 1/1

CDFW California Natural Diversity Database Results;USGS Quad-San Marcos;October 2021 Element-Type Scientific-Name Common-Name Element-Code Federal_Statu State-Status CDFW_Status CA_Rare_I Quad_Code Quad_Name Data_Status Taxonomic-Sort Animals-Amphibians Spea hammondii western spadefoot AAABF02020 None None SSC - 3311722 SAN MARCOS Mapped Animals-Amphibians-Scaphiopodidae-Spea hammondii Animals-Birds Accipiter cooperii Cooper's hawk ABNKC12040 None None WL - 3311722 SAN MARCOS Mapped and Unprocessed Animals-Birds-Accipitridae-Accipiter cooperii Animals-Birds Accipiter striatus sharp-shinned hawk ABNKC12020 None None WL - 3311722 SAN MARCOS Unprocessed Animals-Birds-Accipitridae-Accipiter striatus Animals-Birds Aquila chrysaetos golden eagle ABNKC22010 None None FP;WL - 3311722 SAN MARCOS Unprocessed Animals-Birds-Accipitridae-Aquilachrysaetos Animals-Birds Circus hudsonius northern harrier ABNKC11011 None None SSC - 3311722 SAN MARCOS Unprocessed Animals-Birds-Accipitridae-Circus hudsonius Animals-Birds Elanus leucurus white-tailed kite ABNKC06010 None None FP - 3311722 SAN MARCOS Unprocessed Animals-Birds-Accipitridae-Elanus leucurus Animals-Birds Agelaius tricolor tricolored blackbird ABPBXB0020 None Threatened SSC - 3311722 SAN MARCOS Mapped Animals-Birds-Icteridae-Agelaius tricolor Animals-Birds Icteria virens yellow-breasted chat ABPBX24010 None None SSC - 3311722 SAN MARCOS Unprocessed Animals-Birds-Icteriidae-Icteria virens Animals-Birds Lanius ludovicianus loggerhead shrike ABPBR01030 None None SSC - 3311722 SAN MARCOS Unprocessed Animals-Birds-Laniidae-Lanius ludovicianus Animals-Birds Setophaga petechia yellow warbler ABPBX03010 None None SSC - 3311722 SAN MARCOS Unprocessed Animals-Birds-Parulidae-Setophaga petechia Animals-Birds Aimophila ruficeps canescens southern California rufous-crowned sparrow ABPBX91091 None None WL - 3311722 SAN MARCOS Mapped and Unprocessed Animals-Birds-Passerellidae-Aimophila ruficeps canescens Animals-Birds Artemisiospiza belli belli Bell's sage sparrow ABPBX97021 None None WL - 3311722 SAN MARCOS Unprocessed Animals-Birds-Passerellidae-Artemisiospiza belli belli Animals-Birds Polioptila californica californica coastal California gnatcatcher ABPBJ08081 Threatened None SSC 3311722 SAN MARCOS Mapped and Unprocessed Animals-Birds-Polioptilidae-Polioptila californica californica Animals-Birds Laterallus jamaicensis coturniculus California black rail ABNME03041 None Threatened FP - 3311722 SAN MARCOS Mapped Animals-Birds-Rallidae-Laterallus jamaicensis coturniculus Animals-Birds Athene cunicularia burrowing owl ABNSB10010 None None SSC - 3311722 SAN MARCOS Unprocessed Animals-Birds-Strigidae-Athene cunicularia Animals-Birds Calypte costae Costa's hummingbird ABNUC47020 None None - - 3311722 SAN MARCOS Unprocessed Animals-Birds-Trochilidae-Calypte costae Animals-Birds Empidonax traillii extimus southwestern willow flycatcher ABPAE33043 Endangered Endangered - - 3311722 SAN MARCOS Unprocessed Animals-Birds-Tyrannidae-Empidonaxtrailliiextimus Animals-Birds Vireo bellii pusillus least Bell's vireo ABPBW01114 Endangered Endangered - - 3311722 SAN MARCOS Mapped and Unprocessed Animals-Birds-Vireonidae-Vireo bellii pusillus Animals-Crustaceans Branchinecta sandiegonensis San Diego fairy shrimp ICBRA03060 Endangered None - - 3311722 SAN MARCOS Mapped and Unprocessed Animals-Crustaceans-Branchinectidae-Branchinecta sandiegonensis Animals-Insects Danaus plexippus pop.1 monarch-California overwintering population IILEPP2012 Candidate None - - 3311722 SAN MARCOS Unprocessed Animals-Insects-Nymphalidae-Danaus plexippus pop.1 Animals-Insects Euphydryas editha quino quino checkerspot butterfly IILEPK405L Endangered None - - 3311722 SAN MARCOS Unprocessed Animals-Insects-Nymphalidae-Euphydryas editha quino Animals-Mammals Neotoma lepida intermedia San Diego desert woodrat AMAFF08041 None None SSC - 3311722 SAN MARCOS Unprocessed Animals-Mammals-Cricetidae-Neotoma lepida intermedia Animals-Mammals Chaetodipus fallax fallax northwestern San Diego pocket mouse AMAFD05031 None None SSC - 3311722 SAN MARCOS Unprocessed Animals-Mammals-Heteromyidae-Chaetodipus fallax fallax Animals-Mammals Dipodomys simulans Dulzura kangaroo rat AMAFD03170 None None - - 3311722 SAN MARCOS Unprocessed Animals-Mammals-Heteromyidae-Dipodomys simulans Animals-Mammals Taxidea taxus American badger AMAJF04010 None None SSC - 3311722 SAN MARCOS Mapped Animals-Mammals-Mustelidae-Taxidea taxus Animals-Mammals Corynorhinus townsendii Townsend's big-eared bat AMACCO8010 None None SSC - 3311722 SAN MARCOS Mapped Animals-Mammals-Vespertilionidae-Corynorhinus townsendii Animals-Mammals Lasiurus cinereus hoary bat AMACC05030 None None - - 3311722 SAN MARCOS Mapped Animals-Mammals-Vespertilionidae-Lasiurus cinereus Animals-Mammals Lasiurus xanthinus western yellow bat AMACC05070 None None SSC - 3311722 SAN MARCOS Mapped Animals-Mammals-Vespertilionidae-Lasiurus xanthinus Animals-Reptiles Anniella stebbinsi Southern California legless lizard ARACCO1060 None None SSC - 3311722 SAN MARCOS Mapped Animals-Reptiles-Anniellidae-Anniella stebbinsi Animals-Reptiles Arizona elegans occidentalis California glossy snake ARADB01017 None None SSC - 3311722 SAN MARCOS Mapped Animals-Reptiles-Colubridae-Arizona elegans occidentalis Animals-Reptiles Diadophis punctatus similis San Diego ringneck snake ARADB1001A None None - - 3311722 SAN MARCOS Unprocessed Animals-Reptiles-Colubridae-Diadophis punctatus similis Animals-Reptiles Salvadora hexalepis virgultea coast patch-nosed snake ARADB30033 None None SSC - 3311722 SAN MARCOS Mapped and Unprocessed Animals-Reptiles-Colubridae-Salvadora hexalepis virgultea Animals-Reptiles Coleonyx variegatus abbotti San Diego banded gecko ARACD01031 None None SSC - 3311722 SAN MARCOS Unprocessed Animals-Reptiles-Gekkonidae-Coleonyx variegatus abbotti Animals-Reptiles Thamnophis hammondii two-striped gartersnake ARADB36160 None None SSC - 3311722 SAN MARCOS Unprocessed Animals-Reptiles-Natricidae-Thamnophis hammondii Animals-Reptiles Phrynosoma blainvillii coast horned lizard ARACF12100 None None SSC - 3311722 SAN MARCOS Mapped and Unprocessed Animals-Reptiles-Phrynosomatidae-Phrynosoma blainvillii Animals-Reptiles Plestiodon skiltonianus interparietalis Coronado skink ARACH01114 None None WL - 3311722 SAN MARCOS Mapped and Unprocessed Animals-Reptiles-Scincidae-Plestiodon skiltonianus interparietalis Animals-Reptiles Aspidoscelis hyperythra orange-throated whiptail ARACJ02060 None None WL - 3311722 SAN MARCOS Mapped and Unprocessed Animals-Reptiles-Teiidae-Aspidoscelis hyperythra Animals-Reptiles Aspidoscelis tigris stejnegeri coastal whiptail ARACJ02143 None None SSC - 3311722 SAN MARCOS Mapped and Unprocessed Animals-Reptiles-Teiidae-Aspidoscelis tigris stejnegeri Animals-Reptiles Crotalus ruber red-diamond rattlesnake ARADE02090 None None SSC - 3311722 SAN MARCOS Mapped and Unprocessed Animals-Reptiles-Viperidae-Crotalus ruber Community-Terrestrial San Diego Mesa Claypan Vernal Pool San Diego Mesa Claypan Vernal Pool CTT44322CA None None - - 3311722 SAN MARCOS Mapped Community-Terrestrial-San Diego Mesa Claypan Vernal Pool Community-Terrestrial Southern Riparian Forest Southern Riparian Forest CTT61300CA None None - - 3311722 SAN MARCOS Mapped Community-Terrestrial-Southern Riparian Forest Community-Terrestrial Southern Riparian Scrub Southern Riparian Scrub CTT63300CA None None - - 3311722 SAN MARCOS Mapped Community-Terrestrial-Southern Riparian Scrub Community-Terrestrial Southern Sycamore Alder Riparian Woodland Southern Sycamore Alder Riparian Woodland CTT62400CA None None - - 3311722 SAN MARCOS Mapped Community-Terrestrial-Southern Sycamore Alder Riparian Woodland Plants-Bryophytes Sphaerocarpos drewiae bottle liverwort NBHEP35030 None None 113.1 3311722 SAN MARCOS Mapped Plants-Bryophytes-Sphaerocarpaceae-Sphaerocarpos drewiae Plants-Vascular Eryngium aristulatum var.parishii San Diego button-celery PDAPIOZO42 Endangered Endangered - 113.1 3311722 SAN MARCOS Mapped Plants-Vascular-Apiaceae-Eryngium aristulatum var.parishii Plants-Vascular Aspleniumvespertinum western spleenwort PPASP021PO None None - 4.2 3311722 SAN MARCOS Unprocessed Plants-Vascular-Aspleniaceae-Aspleniumvespertinum Plants-Vascular Artemisia palmeri San Diego sagewort PDASTOS160 None None - 4.2 3311722 SAN MARCOS Unprocessed Plants-Vascular-Asteraceae-Artemisia Palmeri Plants-Vascular Baccharisvanessae Encinitas baccharis PDASTOWOPO Threatened Endangered - 113.1 3311722 SAN MARCOS Mapped Plants-Vascular-Asteraceae-Baccharisvanessae Plants-Vascular Centromadia parryi ssp.australis southern tarplant PDAST4ROP4 None None - 113.1 3311722 SAN MARCOS Mapped Plants-Vascular-Asteraceae-Centromadia parryi ssp.australis Plants-Vascular Holocarpha virgata ssp.elongata curving tarplant PDAST4X041 None None - 4.2 3311722 SAN MARCOS Unprocessed Plants-Vascular-Asteraceae-Holocarpha virgata ssp.elongata Plants-Vascular Isocoma menziesii var.decumbens decumbent goldenbush PDAST57091 None None - 113.2 3311722 SAN MARCOS Mapped Plants-Vascular-Asteraceae-Isocoma menziesii var.decumbens Plants-Vascular Microseris douglasii ssp.platycarpha small-flowered microseris PDAST6E062 None None - 4.2 3311722 SAN MARCOS Unprocessed Plants-Vascular-Asteraceae-Microseris douglasii ssp.platycarpha Plants-Vascular Psilocarphus brevissimus var.multiflorus Delta woolly-marbles PDAST711012 None None - 4.2 3311722 SAN MARCOS Unprocessed Plants-Vascular-Asteraceae-Psilocarphus brevissimus var.multiflorus Plants-Vascular Harpagonella palmeri Palmer's grapplinghook PDBOROH010 None None - 4.2 3311722 SAN MARCOS Mapped and Unprocessed Plants-Vascular-Boraginaceae-Harpagonella Palmeri Plants-Vascular Lepidium virginicum var.robinsonii Robinson's pepper-grass PDBRA1M114 None None - 4.3 3311722 SAN MARCOS Unprocessed Plants-Vascular-Brassicaceae-Lepidium virginicum var.robinsonii Plants-Vascular Convolvulus simulans small-flowered morning-glory PDCON05060 None None - 4.2 3311722 SAN MARCOS Unprocessed Plants-Vascular-Convolvulaceae-Convolvulussimulans Plants-Vascular Dichondra occidentalis western dichondra PDCON08060 None None - 4.2 3311722 SAN MARCOS Unprocessed Plants-Vascular-Convolvulaceae-Dichondra occidentalis Plants-Vascular Arctostaphylos glandulosa ssp.crassifolia Del Mar manzanita PDERI040E8 Endangered None - 113.1 3311722 SAN MARCOS Mapped Plants-Vascular-Ericaceae-Arctostaphylos glandulosa ssp.crassifolia Plants-Vascular Comarostaphylis diversifolia ssp.diversifolia summer holly PDERIOB011 None None 113.2 3311722 SAN MARCOS Mapped Plants-Vascular-Ericaceae-Comarostaphylis diversifolia ssp.diversifolia Plants-Vascular Tetracoccus dioicus Parry's tetracoccus PDEUPlC010 None None - 113.2 3311722 SAN MARCOS Mapped Plants-Vascular-Euphorbiaceae-Tetracoccus dioicus Plants-Vascular Quercus dumosa Nuttall's scrub oak PDFAG050DO None None - 113.1 3311722 SAN MARCOS Mapped Plants-Vascular-Fagaceae-Quercus dumosa Plants-Vascular Quercus engelmannii Engelmann oak PDFAG050KO None None - 4.2 3311722 SAN MARCOS Unprocessed Plants-Vascular-Fagaceae-Quercus engelmannii Plants-Vascular Juncus acutus ssp.leopoldii southwestern spiny rush PMJUN01051 None None 4.2 3311722 SAN MARCOS Unprocessed Plants-Vascular-Juncaceae-Juncusacutusssp.leopoldii Plants-Vascular Acanthomintha ilicifolia San Diego thorn-mint PDLAM01010 Threatened Endangered - 113.1 3311722 SAN MARCOS Mapped and Unprocessed Plants-Vascular-Lamiaceae-Acanthomintha ilicifolia Plants-Vascular Monardella hypoleuca ssp.lanata felt-leaved monardella PDLAM180A2 None None - 113.2 3311722 SAN MARCOS Mapped Plants-Vascular-Lamiaceae-Monardella hypoleuca ssp.lanata Plants-Vascular Hordeum intercedens vernal barley PMPOA380EO None None - 3.2 3311722 SAN MARCOS Unprocessed Plants-Vascular-Poaceae-Hordeum intercedens Plants-Vascular Navarretia fossalis spreading navarretia PDPLM00080 Threatened None - 113.1 3311722 SAN MARCOS Mapped Plants-Vascular-Polemoniaceae-Navarretia fossalis Plants-Vascular Adolphia californica California adolphia PDRHAO1010 None None - 213.1 3311722 SAN MARCOS Mapped Plants-Vascular-Rhamnaceae-Adolphia californica Plants-Vascular Ceanothus verrucosus wart-stemmed ceanothus PDRHA041JO None None - 213.2 3311722 SAN MARCOS Mapped Plants-Vascular-Rhamnaceae-Ceanothus verrucosus Plants-Vascular Chamaebatia australis southern mountain misery PDROSOA010 None None - 4.2 3311722 SAN MARCOS Unprocessed Plants-Vascular-Rosaceae-Chamaebatia australis Plants-Vascular Horkelia truncata Ramona horkelia PDROSOWOGO None None - 113.3 3311722 SAN MARCOS Mapped Plants-Vascular-Rosaceae-Horkelia truncata Plants-Vascular Selaginella cinerascens ashy spike-moss PPSEL01090 None None 4.1 3311722 SAN MARCOS Unprocessed Plants-Vascular-Selaginellaceae-Selaginella cinerascens Plants-Vascular Brodiaeafilifolia thread-leaved brodiaea PMLILOCO50 Threatened Endangered - 113.1 3311722 SAN MARCOS Mapped Plants-Vascular-Themidaceae-Brodiaeafilifolia Plants-Vascular Brodiaeaorcuttii Orcutt'sbrodiaea PMLILOCOBO None None - 113.1 3311722 SAN MARCOS Mapped Plants-Vascular-Themidaceae-Brodiaeaorcuttii 03/08/2022 C7 81 of 159

California Native Plant Society(CNPS)Database,Rare Plant Program,2021 Inventory of Rare and Endangered Plants of California(USGS 7.5'Quadrangle San Marcos,3311722)Onlir 3E+06 Website https://www.rareplants.cnps.org[ accessed 29 October 2021].

ScientificName CommonName Family Lifeform CRPR GRank SRank CESA FESA BloomingP Habitat ElevationLov,ElevationHi CAEndemic EOTotal EOA EOB EOC EOD EOX EOU EOHistoric EORecent EOExtant EOPossibly EOExtirpat EOThreatL DateAdded LastUpdate Chaparral,Coastal scrub,Valley and
Acanthomintha ilicifolia San Diego thorn-mint Lamiaceae annual herb 16.1 G1 S1 CE FT Apr-Jun foothill grassland,Vernal pools 35 3150 FALSE 85 5 24 10 8 26 12 42 43 59 19 7 78 1/1/1974 0:00 7/14/20210:00 Baccharis vanessae Encinitas baccharis Asteraceae perennial deciduous shrub 16.1 G1 S1 CE FT Aug-Nov Chaparral,Cismontane woodland 195 2360 TRUE 31 1 8 1 5 4 12 16 15 27 0 4 20 1/1/1980 0:00 8/25/20210:00 Chaparral,Cismontane woodland,Coastal
Brodiaea filifolia thread-leaved brodiaea Themidaceae perennial bulbiferous herb 16.1 G2 S2 CE FT Mar-Jun scrub,Playas,Valley and foothill grassland, 80 3675 TRUE 141 8 21 22 15 12 63 32 109 129 6 6 72 1/1/1974 0:00 8/25/20210:00 Coastal scrub,Valley and foothill
Eryngium aristulatum var.parishii San Diego button-celery Apiaceae annual/perennial herb 16.1 G5T1 S1 CE FE Apr-Jun grassland,Vernal pools 65 2035 FALSE 83 2 14 8 13 12 34 37 46 71 2 10 60 1/1/1974 0:00 5/26/20210:00 03/08/2022 C7 82 of 159

',
U.S. Fish and Wildlife Service
National Wetlands Inventory National Wetlands Inventory 2 xA! , •• ,Y, a �•!• - Y:. a.•T.l..

If
•'� r, '� ,` r' ,•� r -'�.1�
1:11,454
„ � ,. � _-��` �• .�; �r fir` 0 0.075 0.15 0.3 mi .' '� t , ��/�^•►+ }, �. , j� ! 1^•`," 3�uf�e:- i,Maxar, 0Eye,Earth's r eographicS irbus DS, 0 0.15 0.3 0.6 km "� t r,, U AeroGR1D,IGN,and the GIS User Commugity October 28, 2�21 This map is for general reference only.The US Fish and Wildlife Service is not responsible for the accuracy or currentness of the base data shown on this map.All wetlands related data should Wetlands Freshwater Emergent Wetland Lake be used in accordance with the layer metadata found on the Wetlands Mapper web site.

Estuarine and Marine Deep water Freshwater Forested/Shrub Wetland Other Estuarine and Marine Wetland
`! Freshwater Pond 7 Riverinenp \'ry 'yi 03/08/2022 C" This pageTn prSdGced bj e NWI mapper

APPENDIX B:

CULTURAL RESOURCES
03/08/2022 C7 84 of 159

Michael Baker
We Make o Di f ference
I N T E R N AT 1 0 N A L
January 17,2022
City of Vista and Buena Sanitation District
Michael Hilker,Capital Projects Manager
Engineering Department
200 Civic Center Drive
Vista,California 92084
SUBJECT: CULTURAL RESOURCES MEMORANDUM FOR THE PROPOSED SMILAX-MIMOSA SEWER

IMPROVEMENTS PROJECT,COUNTY OF SAN DIEGO,CALIFORNIA
Dear Mr. Hilker:

Michael Baker International (Michael Baker) prepared this memorandum in support of the proposed Smilax-Mimosa Sewer Improvements Project(project) located in the City of San Marcos and the County of San Diego, California. The project is proposed by the City of Vista (City)/Buena Sanitation District (District) which serves the project area. The District serves as the lead agency under the California Environmental Quality Act (CEQA). Michael Baker conducted a literature review which included the previously certified Supplemental Program Environmental Impact Report (EIR) for the 2077 City of Vista/Buena Sanitation District Comprehensive Sewer Master Plan (CSMP) (HDR 2017), and the previously certified City of Vista 2007 Sewer Master Plan Update Program E/R(Dudek 2008), a cultural resources records search at the South Coastal Information Center(SCIC),a Sacred Lands File search by the Native American Heritage Commission (NAHC), and notification of the project to the San Luis Rey Band of Mission Indians. Michael Baker prepared this memorandum to document efforts satisfying cultural resources mitigation measure CULT-2 of the 2017 CSMP Supplemental Program EIR.

PROJECT LOCATION AND DESCRIPTION
The project area is located in the City of San Marcos and the County of San Diego,generally to the north and south of State Route 78,between Mimosa Avenue to the west,and approximately Community Drive to the east.The project area is depicted in an unsectioned area of Township 12 South,Range 3 West,on the United States Geological Survey San Marcos, California 7.5-minute quadrangle.The project area is generally developed with single-family, multi-family, and institutional properties, roads, and State Route 78.

The proposed capital improvement program (CIP) improvements (sewer realignment) would extend down the centerline of Mimosa Avenue within the existing right-of-way and are considered to meet the Category 1 (CIP Capacity and Condition Project- Hardscape Environs)classification as defined in CSMP.

The proposed improvements would be implemented to redirect existing flows away from downstream pipelines having insufficient capacity. Additionally, other associated activities considered to be maintenance activities by the District (e.g., manhole construction and rehabilitation, pipe relining to support adequate wastewater flows and prevent leakage and/or failure) are proposed to ensure that the sewer infrastructure system continues to function properly and that adequate service can be 5 Hutton Centre Drive,Suite 500 1 Santa Ana,CA 92707
MBAKERINTL.COM Office:949-472.35051 Fax:949-472.8373 1 mbakerintl.com 03/08/2022 C7 85 of 159

provided to District customers.The maximum depth of excavation is anticipated to be 18 feet below ground surface for trenching for the proposed improvements.

Improvements would primarily occur along existing sewer alignments within roadway rights-of-way or existing public easements,either currently under District ownership or other affected agencies,with the exception of limited improvements within the Coral Tree Manor apartments and Springdale Estates mobile home park, which would be located within existing public easements or on privately owned property.The Coral Tree Manor apartments were developed in 1987 and the Springdale Estates mobile home park was developed circa early 1970s.No alterations or demolition activities are proposed for any of the buildings or structures on either property.

CULTURAL RESOURCES RECORDS SEARCH
Per Michael Baker's request,the SCIC conducted a records search of the project area and a one-quarter- mile radius on October 11,2021.The SCIC at San Diego State University is part of the California Historical Resources Information System, an affiliate of the California Office of Historic Preservation (OHP). The SCIC is the official state repository of cultural resources records and reports for San Diego County. As part of the records search and background research, the following federal and state inventories were reviewed:
• California Points of Historical Interest(OHP 2022). • California Historical Landmarks (OHP 2022).
• Archaeological Determinations of Eligibility for San Diego County(OHP 2012). • Built Environment Resources Directory(OHP 2021).The directory includes resources evaluated for listing and listed in the National Register of Historic Places (NRHP), National Historic Landmarks, California Register of Historical Resources (CRHR), California Historical Landmarks, and California Points of Historical Interest for San Diego County.

No previously recorded cultural resources were identified within the project area. Twelve cultural resources were identified within one-quarter mile of the project area, and are described briefly in the table below.

Smilax-Mimosa Sewer Improvements Project 2
Cultural Resources Memorandum
03/08/2022 C7 86 of 159

Resource Name/ Address Type OHP Historical Relationship to P-Number/ ••-/ Resource Project
Trinomial Eligibility •
• `
P-37-018190 2732 South Santa Industrial Under 50 years of No Within Fe Avenue building age at time of approximately recording; 0.17 mile
recommended
ineligible for NRHP;
not evaluated for
CRHR or local listing
P-37-018191 2709 South Santa Commercial Under 50 years of No Within Fe Avenue building age at time of approximately recording; 0.15 mile
recommended
ineligible for NRHP;
not evaluated for
CRHR or local listing
P-37-018193 144 Smilax Road Single-family Recommended No Within residence ineligible for NRHP; approximately
not evaluated for 0.10 mile
CRHR or local
designation
P-37-018194 139 Smilax Road Single-family Recommended No Within residence ineligible for NRHP; approximately
not evaluated for 0.10 mile
CRHR or local
designation
P-37-018195 135 Smilax Road Single-family Under 50 years of No Within residence age at time of approximately
recording; 0.10 mile
recommended
ineligible for NRHP;
not evaluated for
CRHR or local listing
Smilax-Mimosa Sewer Improvements Project 3
Cultural Resources Memorandum
03/08/2022 C7 87 of 159

Resource Name/ Address Type OHP Historical Relationship to P-Number/ ••-/ Resource Project
Trinomial • • under
• `
P-37-018196 121 Smilax Road Single-family Under 50 years of No Within residence age at time of approximately
recording; 0.15 mile
recommended
ineligible for NRHP;
not evaluated for
CRHR or local listing
P-37-018197 113 Smilax Road Single-family Under 50 years of No Within residence age at time of approximately
recording; 0.15 mile
recommended
ineligible for NRHP;
not evaluated for
CRHR or local listing
N/A 333 Poinsettia Single-family 6Y:Determined No Within Avenue residence ineligible for NRHP approximately by consensus 0.70 mile
through Section
106 process—Not
evaluated for CRHR
or local listing
P-37-025309/ N/A Prehistoric Found to be a Yes Within CA-SDI-016787 site—lithic significant resource approximately workshop/ under CEQA 200 feet
hunting
station
P-37-030664/ N/A Prehistoric Not evaluated No Within CA-SDI-019476 site—lithic approximately
scatter 0.10 mile
Highway 395/ Highway 395 Road Recommended Yes Within P-37-033557 eligible for NRHP approximately and CRHR 0.45 mile
P-37-038298 425 Smilax Road Single-family Recommended No Within residence ineligible for NRHP approximately
and CRHR 180 feet
The records search identified 23 previous cultural resources studies that have been conducted within one-quarter mile of the project area, 11 of which included portions of the project area. See summary table below.

Report Author(s) Date Title In Project Identified No. Area? Resources
in Project
SD-00224 Carrico,Richard 1977 Archaeological Survey of the San Marcos No No General College Community Plan Area San
Marcos,California
Smilax-Mimosa Sewer Improvements Project 4
Cultural Resources Memorandum
03/08/2022 C7 88 of 159

Report Author(s) Date Title In Project Identified • Area? Resources
in •
SD-00696 Fink,Gary R. 1974 Archaeological Survey for the Proposed No No Widening of South Santa Fe Avenue,Vista,
California
SD-01031 Gallegos,Dennis 1983 Archaeological Report for Yes No Business/Industrial,Richmar,Lake San
Marcos and Barham/Discovery Community
Plan,San Marcos,California
SD-01600 White,Robert S. 1990 An Archaeological Assessment of A 16+/- No No Acre Parcel in the 700 Block of Plumosa
Avenue,Vista,San Diego County
SD-03075 Carrico,Richard, 1995 Historic Property Survey Report for the Yes No Andrew Pigniolo, State Route 78 Corridor Enhancement Brian Glenn,and Project li-Sd-78,P.M.5.3-9.8,965100,City Kathleen of Vista,California
Crawford
SD-03374 Glenn,Brian K. 1993 A Positive Archaeological Survey Report Yes No for the Sycamore Avenue Interchange
Project 11-SD-78 PM 8.7/9.8 11221-184970
Vista,California
SD-06162 Glenn,Brian 1993 A Positive Archaeological Survey Report No No for the Sycamore Avenue Interchange
Project
SD-06698 White,Robert 1990 An Archaeological Assessment of A 16+ No No Acre Parcel in the 700 Block of Plumosa
Avenue,Vista,San Diego County
SD-07157 Smith,Brian 1999 Negative Archaeological Survey Report: No No the Northwoods Apartment Project
SD-07274 Carrico,Richard 1995 Historic Property Survey Report for the Yes No State Route 78 Corridor Enhancement
Project 11-SD-78,P.M.5.3-9.8,965100 City
of Vista,California
SD-08546 Dolan,Christy 2003 First Supplemental Historic Property No No Survey Report:South Santa Fe Avenue
Reconstruction Project
SD-09579 Guerrero,Monica 2004 Cultural Resource Survey and Test Report Yes No C.,Dennis R. for the San Marcos School District San Gallegos,and Marcos,California
Tracy Stropes
SD-09600 Cook,John 2005 Cultural Resources Survey for Smilax Road Yes No Extension Project,San Diego County,
California
Smilax-Mimosa Sewer Improvements Project 5
Cultural Resources Memorandum
03/08/2022 C7 89 of 159

Report Author(s) Date Title In Project Identified • Area? Resources
in •
SD-10551 Arrington,Cindy 2006 Cultural Resources Final Report of Yes No Monitoring and Findings for the Qwest
Network Construction Project,State of
California
SD-11228 Marben-Laird 1987 Historic Resource Survey,A Project of the No No Associates City of Vista,California
SD-11524 Rosenberg,Seth 2007 A Cultural Resources Evaluation for the Yes No A.,Adriane Vista and Buena Sanitation District 2007 Dorrler,and Brian Sewer Master Plan Update
F.Smith
SD-12039 Guerrero,Monica 2007 Cultural Resources Monitoring Report for No No and Dennis R. the North County Transit District(NCTD) Gallegos Sprinter Rail Project Oceanside to
Escondido,California
SD-12418 Clowery-Moreno, 2008 Results of the Mitigation Monitoring and Yes No Sara and Brian F. Data Recovery Program for the San Marcos Smith Unified School District Elementary School
#2 Project
SD-14140 Robbins-Wade, 2003 Archaeological Records Search and No No Mary Literature Review,Vallecitos Water District
Master Plan Update San Diego County,
California
SD-15740 Sarah A.Williams 2015 Cultural Resource Records Search and Site No No and Carried D. Visit Results for Verizon Wireless Candidate Wills 'Smilax',2638 South Santa Fe Avenue,San
Marcos,San Diego County,California.EBI
Project No.61140935
SD-17337 Gilbert,Rebecca 2016 Archaeological Monitoring Report for Hqt No No H. Homes Oleander Avenue Project in San
Marcos,San Diego County,California
SD-17813 Tang,Bai and 2019 Historic-Period Building Evaluation 425 Yes No Terri Jacquemain Smilax Road Assessor's Parcel Number 217-191-02 San Marcos-Vista Area,San
Diego County,California
SD-18211 Campbell-King, 2018 Cultural Resources Due Diligence Study for Yes No Breana and Joe the Smilax Project,Unincorporated San
Power Diego County,California

NATIVE AMERICAN HERITAGE COMMISSION SACRED LANDS FILE RECORDS SEARCH On October 6,2021,Michael Baker submitted a request to the NAHC to conduct a records search of the Sacred Lands File for the project area.On November 14,2021,the NAHC relayed the results of the Sacred Lands File search were negative for cultural resources.

Smilax-Mimosa Sewer Improvements Project 6
Cultural Resources Memorandum
03/08/2022 C7 90 of 159

NATIVE AMERICAN TRIBAL NOTIFICATION
Pursuant to mitigation measure CULT-2 in the 2017 CSMP Supplemental Program EIR,on December 13,2021,a letter and maps were sent to Ms.Cami Mojado of the San Luis Rey Band of Mission Indians (SLR Band)via USPS mail and email to notify her of the proposed project.Ms.Mojado replied via email on December 17,2021,stating she was having a problem opening the file and asked if Michael Baker could resend it.Michael Baker emailed the letter again to Ms.Mojado the same day,and let her know the hard copy sent via USPS mail was delivered on December 15,2021,according to the delivery receipt.Michael Baker sent a follow-up email to Ms.Mojado on December 27,2021. No response has been received as of the date of this memorandum.

APPLICABLE MITIGATION MEASURES
The table below summarizes the cultural resources mitigation measures identified in the previously certified CSMP Supplemental Program EIR(HDR 2017),and the applicability of the mitigation measures to the current project.

MM# LANGUAGE APPLICABILITY
CULT-1 Construction-Related Vibration. Prior to the issuance of No. CULT-1 does not apply, as project-specific construction documents for CIP project construction activities Capacity and Condition Projects (Hardscape Environs), would not occur within 25 feet of the City Engineer shall determine whether construction a known NRHP or CRHR eligible activities would occur within 25 feet of a NRHP or CRHR or listed historic structure. eligible or listed historic structure. For structures that Although project construction have not been previously evaluated, the City Engineer activities would occur within 25 shall consult with a qualified Architectural Historian feet of buildings in the Coral Tree approved by the City to conduct an evaluation of the Manor apartments complex, the structure. complex was developed in 1987
and does not require
If the structure is determined eligible or already eligible consideration for potential or listed in the NRHP or CRHR, a structural evaluation historical significance. shall be conducted by a Professional Structural Engineer Construction activities would to identify maximum allowable levels of vibration during occur within the Springdale construction. If a historic determination is required, the Estates mobile home park, but engineer shall provide recommendations on not within 25 feet of any approaches to stabilization in conjunction with vibration permanent structures. monitoring. Permanent stabilization measures shall
follow the Secretary of the Interior's guidelines for the treatment of historic properties. If the buildings are
temporarily stabilized for the duration of construction activities,when removed,the buildings shall be restored to their pre-construction condition when the
stabilization measures are removed.

CULT-2 Project-Specific Archaeological Survey. Prior to the Yes. CULT-2 applies because the issuance of project-specific construction documents for current project qualifies as a"CIP CIP Capacity and Condition Projects (Hardscape and Capacity and Condition Project Smilax-Mimosa Sewer Improvements Project 7
Cultural Resources Memorandum
03/08/2022 C7 91 of 159

Cross County Environs), Pump Station Rehabilitations, (Hardscape and Cross County and Out-of-Service Area Projects, a Qualified Environs)".

Archaeologist approved by the City shall contact the
NAHC regarding a Sacred Lands File Search for the
project area. In addition,the City shall request a written response from the San Luis Rey Band of Mission Indians
(SLR Band) (a tribe traditionally and culturally affiliated with the site) regarding whether the site of the 2017
CSMP improvement project may potentially affect
Native American resources. If the NAHC and/or the SLR
Band confirms potential known resources, a pedestrian
survey (i.e., physical walk over) shall first be conducted by the Qualified Archaeologist and a TCA (traditionally and culturally affiliated) Native American Monitor.

Should the pedestrian survey identify Native American
cultural resources, the Qualified Archeologist shall, in consultation with the TCA Native American monitor and
the SLR Band, make an immediate written evaluation of
the significance and appropriate treatment of the resource, including any avoidance measures, additional
testing and evaluations,or data recovery plans,and Pre- Excavation Agreements with the Tribe. If the SLR Band
confirms, in consultation with the Qualified Archaeologist, that there is a potential for unknown
resources to be uncovered during construction activities, then Mitigation Measure CULT-3, Archaeological Monitoring,shall be implemented.

CULT-3 Archaeological Monitoring.Cultural resource mitigation No. CULT-3 does not currently monitoring shall be conducted to provide for the apply as no known identification, evaluation, treatment, and protection of archaeological resources have any cultural resources that are affected by or may be been identified within the discovered during the construction of the proposed project area, and the potential project. The monitoring shall consist of the full-time for unknown archaeological presence of a Qualified Archaeologist and a TCA resources to be uncovered (traditionally and culturally affiliated) Native American during construction activities Monitor,and the monitoring activities shall be identified has not been identified. and defined in a Pre-Excavation Agreement between the
City's Engineering Department and the San Luis Rey
Band. The purpose of this agreement shall be to
formalize protocols and procedures for the protection,
treatment, and disposition of, but not limited to, such items as Native American human remains, funerary
objects, cultural and religious landscapes, ceremonial
items, traditional gathering areas and cultural items,
located and/or discovered through the cultural resource mitigation monitoring program in conjunction with the
construction of the proposed project, including Smilax-Mimosa Sewer Improvements Project 8
Cultural Resources Memorandum
03/08/2022 C7 92 of 159

additional archaeological surveys and/or studies, excavations, geotechnical investigations, soil surveys, grading,or any other ground disturbing activities.Other tasks of the monitoring program shall include the following:
• The requirement for cultural resource mitigation
monitoring shall be noted on all applicable
construction documents, including demolition
plans,grading plans,etc.
• The Qualified Archaeologist and TCA Native
American Monitor shall attend all applicable pre-
construction meetings with the Contractor
and/or associated Subcontractors.
• The Qualified Archaeologist shall maintain
ongoing collaborative consultation with the TCA
Native American Monitor during all ground
disturbing or altering activities, as identified
above.
• The Qualified Archaeologist and/or TCA Native
American Monitor may halt ground-disturbing
activities if archaeological artifact deposits or
cultural features are discovered. In general,
ground-disturbing activities shall be directed
away from these deposits for a short time to
allow a determination of potential significance,
the subject of which shall be determined by the
Qualified Archaeologist and the TCA Native
American Monitor, in consultation with the San
Luis Rey Band.Ground disturbing activities shall
not resume until the Qualified Archaeologist, in
consultation with the TCA Native American
Monitor, deems the cultural resource or feature
has been appropriately documented and/or
protected. At the Qualified Archaeologist's
discretion, the location of ground disturbing
activities may be relocated elsewhere on the
project site to avoid further disturbance of
cultural resources.
• The Qualified Archaeologist and/or TCA Native
American Monitor may also halt ground
disturbing activities around known
archaeological artifact deposits or cultural
features if, in their respective opinions, there is
the possibility that they could be damaged or
destroyed.
• The avoidance and protection of discovered
unknown and significant cultural resources
and/or unique archaeological resources is the
. ............ . . ............ . . ............ . . ............ . . .............. .. . ............ . .. ............... . .. ................. .. . ............ .. ................ .. ............... .. ................ .. ................ . ................. . .. ..............................

Smilax-Mimosa Sewer Improvements Project 9
Cultural Resources Memorandum
03/08/2022 C7 93 of 159

preferable mitigation for the proposed project.If
avoidance is not feasible, a Data Recovery Plan
may be authorized by the City as the Lead
Agency under CEQA.If data recovery is required,
then the San Luis Rey Band shall be notified and
consulted in drafting and finalizing any such
recovery plan.
• Prior to the release of any Bonds associated with
the construction of improvements noted in the
2017 CSMP, a Monitoring Report and/or
Evaluation Report, which describes the results,
analysis and conclusions of the cultural resource
mitigation monitoring efforts (such as, but not
limited to, a Data Recovery Program) shall be
submitted by the Qualified Archaeologist,along
with the TCA Native American Monitor's notes
and comments, to the City's Director of
Community Development for approval.

CULT-4 Paleontological Monitoring. Monitoring during Yes. CUL-4 applies because the construction grading or trenching shall be required for current proposed project all CIP conveyance projects (Hardscape and Cross- qualifies as a "CIP conveyance Country Environs)that would excavate to a depth of ten project (Hardscape and Cross feet or more. Prior to the issuance of project specific County Environs)" and construction documents,the City Engineer shall retain a excavation is anticipated to Professional Paleontologist to observe all earth- reach 18 feet below ground disturbing activities.All fossil materials recovered during surface. mitigation monitoring shall be cleaned, identified, cataloged, and analyzed in accordance with standard
professional practices. The results of the field work and laboratory analysis shall be submitted in a technical
report and the entire collection transferred to an approved facility.

CULT-5 Disturbance to Human Remains. As specified by Yes. CULT-5 applies because it is California Health and Safety Code Section 7050.5, if required by the California Health human remains are found on the project site during and Safety Code should human construction or during archaeological work, the person remains be found on the project responsible for the excavation, or his or her authorized site during project construction representative, shall immediately notify the San Diego or archaeological activities.

County Coroner's office by telephone. No further
excavation or disturbance of the discovery or any nearby area reasonably suspected to overlie adjacent remains
(as determined by the Qualified Archaeologist and/or
the TCA (traditionally and culturally affiliated) Native American Monitor) shall occur until the Coroner has
made the necessary findings as to origin and disposition pursuant to Public Resources Code 5097.98. If such a
Smilax-Mimosa Sewer Improvements Project 10
Cultural Resources Memorandum
03/08/2022 C7 94 of 159

discovery occurs, a temporary construction exclusion
zone shall be established surrounding the area of the
discovery so that the area would be protected (as
determined by the Qualified Archaeologist and/or the
TCA Native American Monitor), and consultation and
treatment could occur as prescribed by law. As further
defined by State law, the Coroner would determine
within two working days of being notified if the remains are subject to his or her authority. If the Coroner recognizes the remains to be Native American,he or she
shall contact the Native American Heritage Commission
(NAHC) within 24 hours. The NAHC would make a
determination as to the Most Likely Descendent. If Native American remains are discovered, the remains
shall be kept"in situ" ("in place"), or in a secure location in close proximity to where they were found, and the
analysis of the remains shall only occur on-site in the presence of the TCA Native American Monitor.

This memorandum satisfies the requirements of mitigation measure CULT-2, which includes completing a Sacred Lands File search for the project area, and notification of the project to the SLR Band. Neither the Sacred Lands File search nor the SLR Band identified known or potential Native American cultural resources within the project area, and therefore, no impacts to known cultural or historic resources are anticipated.

Although mitigation measure CULT-3—Archaeological Monitoring does not apply,the City/District may request the SLR Band to provide TCA Native American monitoring services should the City/District consider it necessary during the course of project construction.

PREPARER QUALIFICATIONS
This memorandum was prepared by Michael Baker International Senior Architectural Historian Susan Zamudio-Gurrola, MHP, and Senior Archaeologist Kholood Abdo, MA, RPA, and reviewed for quality control by Senior Cultural Resources Manager Margo Nayyar,MA.

Ms. Zamudio-Gurrola is an architectural historian with eight years of experience in cultural resource management. Her experience includes conducting archival research and built environment surveys, conducting evaluations for the NRHP, CRHR, and local designations, assessing integrity of historic resources, developing historic context statements, reviewing projects for conformance with the Secretary of the Interior's Standards, and preparing cultural resources studies in compliance with the California Environmental Quality Act(CEQA),National Environmental Protection Act(NEPA),Section 106 of the National Historic Preservation Act (NHPA), and local ordinances. She also prepares cultural resources sections for CEQA environmental documents such as initial studies and environmental impact reports,and has demonstrated experience preparing Caltrans-format cultural resources studies,finding of effect documents, and Historic American Buildings Survey/Historic American Engineering Record documentation for buildings and structures. Ms.Zamudio-Gurrola meets the Secretary of the Interior's Professional Qualification Standards for history and architectural history.

Smilax-Mimosa Sewer Improvements Project 1 1
Cultural Resources Memorandum
03/08/2022 C7 95 of 159

Ms. Abdo is an archaeologist with 26 years of experience in prehistoric and historical archaeology and cultural resources management. Her experience includes writing technical reports, including NEPA, NHPA,and CEQA compliance documents.She has supervised and managed all phases of archaeological fieldwork, including survey, Phase II testing and evaluations and data recovery,and monitoring at sites throughout California and Arizona since 1999. In her current capacity as senior archaeologist and laboratory director,Ms.Abdo oversees the processing,analysis,and curation of artifact collections from both prehistoric and historical sites. Her cultural material analysis experience includes flaked and ground stone lithics, glass, prehistoric and historic ceramic, and bead analysis. Ms. Abdo meets the Secretary of the Interior's Professional Qualification Standards for prehistory and historical archaeology.

Ms. Nayyar is a senior architectural historian with 12 years of cultural management experience in California, Nevada, Arizona, Idaho, Texas, and Mississippi. Her experience includes built environment surveys, evaluation of historic-era resources using guidelines outlined in the NRHP and CRHR, and preparation of cultural resources technical studies pursuant to CEQA and Section 106 of the NHPA, including identification studies, finding of effect documents, memorandum of agreements, programmatic agreements, and Historic American Buildings Survey/Historic American Engineering Record/Historic American Landscapes Survey mitigation documentation. She prepares cultural resources sections for CEQA environmental documents, including infill checklists, initial studies, and environmental impact reports, as well as NEPA environmental documents, including environmental impact statements and environmental assessments. She also specializes in municipal preservation planning, historic preservation ordinance updates, Native American consultation, and provision of Certified Local Government training to interested local governments.She develops Survey 123 and Esri Collector applications for large-scale historic resources surveys,and authors NRHP nomination packets.

Ms. Nayyar meets the Secretary of the Interior's Professional Qualification Standards for history and architectural history.

Sincerely,
Susan Zamudio-Gurrola,MHP Kholood Abdo,RPA
Senior Architectural Historian Senior Archaeologist Attachments:

Attachment 1 — Figures
Attachment 2— NAHC Sacred Lands File Search
Attachment 3— Native American Tribal Notification
Smilax-Mimosa Sewer Improvements Project 12
Cultural Resources Memorandum
03/08/2022 C7 96 of 159

REFERENCES
California Office of Historic Preservation (OHP).2012.Archaeological Determinations of Eligibility for San Diego County.
—2021. Built Environment Resources Directory for San Diego County.Accessed January 4,2022, https://ohp.parks.ca.gov/?page id=30338
—2022."California Historical Resources".Accessed January 4,2022, https:Hohp parks.ca.gov/Iistedresources/
H D R.2017.Supplemental Program En vironmental Impact Report for the 2017 City of l/ista/Buena Sanitation District Comprehensive Sewer MasterPlan(CSMP).On file with Michael Baker International.

Smilax-Mimosa Sewer Improvements Project 13
Cultural Resources Memorandum
03/08/2022 C7 97 of 159

Attachment 1
Figures
03/08/2022 C7 98 of 159

6 AVIL AN
* s72m mOUNTAIF i
POAK
N T E C A Ny�r pE5 rANOXS SEAL
lR44K ....li,'
Fi. tt
Fallbraak.
r41
til CBf Reef `r �
>ENDLfTON P
SL �
x .f
� 2
Camp - 7
5 Pendlaso M1t r - Map Detail
�MCAS F, =Bonsall
P [AYPPEHoIFrau ` i
AL r
o� San Diego
WARE �x �,
>rvuNTArh y County
'= i, a ARsawe_ Itif
e3h Cide Muni y
n
Airport A, r` AAAS
Vista nG.i
❑ceanside `�, `j � ate,
`�.: 78
Carlsbad ft2,0,�3f �+5In Marcos
}qt c C l d l a n --�yi
Paiornar AirporLL Alr[nrr it •
-I' E scondide
�n p`�uIBNa7k`{�r
�I
Ramona
1Airport
S4ryrA rCfAR1A
ti
Encinitas
'J 882 w
i�3rNq,7,lri�r I k
�r l�
n
Solana Beach . J
Pow fy ;:"
f. p�UUI
E
O 0�
ANy H 67
KEARNY" th
1hIF 5 R :• � h _
i„ P1ir any l t k
rlca �Lakesi
Project Location

SMILAX-MIMOSA SEWER
_ N 0 2.5 5 10 IMPROVEMENT PROJECT INTERNATIONAL Miles Regional Vicinity
Source:Esri,ArcGIS Online,National Geographic World Map:Vista,California 03/08/2022 C7 99 of 15�igure 1

1�S'an MarcoSrQqu
�=
WAT
,4.

W a
RA
.
:."- N f> ■ ll�lfe �� Marcos
Michael Baker '
r
1 1 : 1 11 •

/'' � �� � � y•sue" �/.._ ''r '✓ � , « ` �/�i?`o .f�f. ,,. o. .•:. \..+ d• -_may! �� � �� �� S�-l� Al
AMP
It
«,fir
•A ♦ •' l• r�
► ! '� t{q 3'/' "mil
�4
r
v
u
-.♦ t, ..r � .. . �. 1. A w a.• � , y
Y✓ �'yr r L r
,�`,. �r„ fir• . ? � ,/ � `rr
31,
�_ ;�\ 1 L.� `'\f ♦, 4 ,` ice r—)t 4)
:•r by �` % • r L { .t ,�'.
ma�yy'',.

Proposed Open Cut • Existing MH
MH Access in Cleared Easement O Proposed—MH
Internal Pipe Rehab O Proposed MH Rehab
Existing Sewer Alignment

SMILAX-MIMOSA SEWER
_ N 0 250 500 1,000 IMPROVEMENT PROJECT INTERNATIONAL Feet Project Area
I Source:Esri,ArcGIS Online,2021 Nearmap Imagery:Vista,California 03/08/2022 C7 101 of 15�igure 3

Attachment 2
NAHC Sacred lands File Search
03/08/2022 C7 102 of 159

r 1+`w�• STATE OF CALIFORNIA Gavin Newsom.Governor •

NATIVE AMERICAN HERITAGE COMMISSION
z 111 1
d s
2 November 14, 2021
Margo Nayyar
Michael Baker International
CHAIRPERSON Laura Miranda o.na Via Email to: [email protected] [email protected] &[email protected] Luiseno
VICE CHAIRPERSON Re: Mimosa Avenue Sewer Addendum Project, San Diego County Reginald Pagaling
Chumash
Dear Ms. Nayyar:

PARLIAMENTARIAN
Russell Attebery A record search of the Native American Heritage Commission (NAHC) Sacred Lands File (SLF) Karuk was completed for the information you have submitted for the above referenced project. The results were negative. However, the absence of specific site information in the SLF does not COMMISSIONER indicate the absence of cultural resources in any project area. Other sources of cultural William Mungary resources should also be contacted for information regarding known and recorded sites.

Paiute/White Mountain
Apache Attached is a list of Native American tribes who may also have knowledge of cultural resources in the project area. This list should provide a starting place in locating areas of potential COMMISSIONER adverse impact within the proposed project area. I suggest you contact all of those indicated; Isaac Bojorquez if they cannot supply information, they might recommend others with specific knowledge. By Ohlone-Costanoan contacting all those listed,your organization will be better able to respond to claims of failure to consult with the appropriate tribe. If a response has not been received within two weeks of COMMISSIONER notification, the Commission requests that you follow-up with a telephone call or email to Sara Dutschke Miwok ensure that the project information has been received.

If you receive notification of change of addresses and phone numbers from tribes, please notify COMMISSIONER Buffy McQuillen me. With your assistance,we can assure that our lists contain current information.

Yokayo Porno,Yuki,
Nomlaki If you have any questions or need additional information, please contact me at my email address: [email protected].

COMMISSIONER
Wayne Nelson
Luiseno Sincerely,COMMISSIONER AIU41.'
Stanley Rodriguez oxn�Kumeyaay
Andrew Green
EXECUTIVE SECRETARY Cultural Resources Analyst
Christina Snider
Pomo Attachment

NAHC HEADQUARTERS
1550 Harbor Boulevard
Suite 100
West Sacramento,
California 95691
(916) 373-3710
[email protected]
NAHC.ca.gov

Page 1 of 1 ends

03/08/2022 C7 103 of 159

Attachment 3
Native American Tribal Notification
03/08/2022 C7 104 of 159

From: ZarrudioGurmla.Susan
To: cirmiadcOsirmssionlndlans.am crrs"ssicnindians(SamaiLmm Cc: mhilkerdbdtvofvista.com:Thomas.Acunafnv5.com: Marotx. Nicole Subject: Notification-5milax-Mimosa Sewer Improvements Project Date: Monday,December 13,2021 1:33:00 PM
Attachments: 2021-12-13 Notification Letter SLR Band of Mission Indians.odf Dear Ms. Mojado,
Please see the attached notification letter and maps for the Smilax-Mimosa Sewer Improvements Project.A copy of this letter is also being sent via LISPS mail.

Thank you for your time,
Susan Zarnudio-Gurrola,MHP I Senior Architectural Historians she/her 5051 Verdugo Way, Suite 300 1 Camarillo, CA 93012 1 [0]805-384-4090 [M1 310-592-0815 [email protected] I www.mbaker'ntl.com 8 03/08/2022 C7 105 of 159

Michael Baker We Moke o Difference
I N T E R N AT 1 0 N A L
December 13,2021
San Luis Rey Band of Mission Indians
Attention:Cami Mojado
1889 Sunset Drive
Vista,CA 92081
[email protected]
[email protected]
RE: NOTIFICATION FOR THE SMILAX-MIMOSA SEWER IMPROVEMENTS PROJECT, CITY OF VISTA & BUENA

SANITATION DISTRICT
Dear Ms.Mojado:

This correspondence has been prepared on behalf of the City of Vista(City)and Buena Sanitation District(District) to provide notification of the proposed Smilax-Mimosa Sewer Improvements Project(proposed project).

As indicated on the attached maps,the land areas affected by the proposed project are located in the City of San Marcos and unincorporated San Diego County, generally to the north and south of State Route 78, between Mimosa Avenue to the west and Community Drive to the east.The proposed sewer improvements would redirect existing flows away from downstream pipelines that have insufficient capacity.Associated activities would include manhole construction and rehabilitation and pipe relining to prevent leakage or breaks.All improvements would occur along existing sewer alignments within roadway rights-of-way or existing public easements.It is anticipated that project construction will commence in the 15i quarter of 2022.

The proposed action was evaluated in the Supplemental Program Environmental Impact Report (SPEIR) for the 2017 City of Vista/Buena Sanitation District Comprehensive Sewer Master Plan. The SPEIR includes mitigation requirements to protect tribal cultural resources. It is anticipated that construction mitigation monitoring will be provided consistent with mitigation measures CULT-2, -3, -4, and -5 of the Final 2017 SPEIR (available at https://www.cityofvista.com/home/showpublisheddocument/l 3661/636450396562570000).

In compliance with mitigation requirements of the SPEIR, the City and District completed a records search and requested a Sacred Lands File search from the Native American Heritage Commission. Both searches yielded negative results. In order to complete mitigation requirements,the City and District are required to contact you directly in the event you have record of any known resources that may be affected by the project and wish to provide comments.

If you have any questions or concerns regarding this project relative to tribal cultural resources, please respond within 14 days from receipt of this letter. I can be contacted at (805) 384-4090 or via e-mail at [email protected],you may contact Michael Hilker,Capital Projects Manager, of the City of Vista and Buena Sanitation District at 760-643-5428 or [email protected].

Please also note that the City/District will be contracting with NV5 for the proposed project. Mr. Tom Acuna, Environmental Manager,at NV5 is available at 858-385-2195 or [email protected],and will be the contact for any during-construction monitoring,as needed.

Thank you for your assistance.

Sincerely,
03/08/2022 C7 106 of 159

San Luis Rey Band of Mission Indians
RE:Smilax Mimosa SLR Band IetterSmilax-Mimosa Sewer Improvements Project

Page 2 ends

Senior Architectural Historian
Attachments: Attachment 1—Figures
CC:Mr.Michael Hilker,Capital Projects Manager,City of Vista&Buena Sanitation District Mr.Thomas Acuna,NV5
03/08/2022 C7 107 of 159

6 AVIL AN
* s72m mOUNTAIF i
POAK
N T E C A Ny�r pE5 rANOXS SEAL
lR44K ....li,'
Fi. tt
Fallbraak.
r41
til CBf Reef `r �
>ENDLfTON P
SL �
x .f
� 2
Camp - 7
5 Pendlaso M1t r - Map Detail
�MCAS F, =Bonsall
P [AYPPEHoIFrau ` i
AL r
o� San Diego
WARE �x �,
>rvuNTArh y County
'= i, a ARsawe_ Itif
e3h Cide Muni y
n
Airport A, r` AAAS
Vista nG.i
❑ceanside `�, `j � ate,
`�.: 78
Carlsbad ft2,0,�3f �+5In Marcos
}qt c C l d l a n --�yi
Paiornar AirporLL Alr[nrr it •
-I' E scondide
�n p`�uIBNa7k`{�r
�I
Ramona
1Airport
S4ryrA rCfAR1A
ti
Encinitas
'J 882 w
i�3rNq,7,lri�r I k
�r l�
n
Solana Beach . J
Pow fy ;:"
f. p�UUI
E
O 0�
ANy H 67
KEARNY" th
1hIF 5 R :• � h _
i„ P1ir any l t k
rlca �Lakesi
Project Location

SMILAX-MIMOSA SEWER
_ N 0 2.5 5 10 IMPROVEMENT PROJECT INTERNATIONAL Miles Regional Vicinity
Source:Esri,ArcGIS Online,National Geographic World Map:Vista,California 03/08/2022 C7 108 of 15�igure 1

1�S'an MarcoSrQqu
�=
WAT
,4.

W a
RA
.
:."- N f> ■ ll�lfe �� Marcos
Michael Baker '
r
1 1 : 1 1 • • •

/'' � �� � � y•sue" �/.._ ''r '✓ � , « ` �/�i?`o .f�f. ,,. o. .•:. \..+ d• -_may! �� � �� �� S�-l� Al
AMP
It
«,fir
•A ♦ •' l• r�
► ! '� t{q 3'/' "mil
�4
r
v
u
-.♦ t, ..r � .. . �. 1. A w a.• � , y
Y✓ �'yr r L r
,�`,. �r„ fir• . ? � ,/ � `rr
31,
�_ ;�\ 1 L.� `'\f ♦, 4 ,` ice r—)t 4)
:•r by �` % • r L { .t ,�'.
ma�yy'',.

Proposed Open Cut • Existing MH
MH Access in Cleared Easement O Proposed—MH
Internal Pipe Rehab O Proposed MH Rehab
Existing Sewer Alignment

SMILAX-MIMOSA SEWER
_ N 0 250 500 1,000 IMPROVEMENT PROJECT INTERNATIONAL Feet Project Area
I Source:Esri,ArcGIS Online,2021 Nearmap Imagery:Vista,California 03/08/2022 C7 110 of 15�igure 3

ZamudioGurrola, Susan
From: Carmen Mojado
Sent: Friday, December 17, 2021 9:10 AM
To: ZamudioGurrola, Susan
Subject: EXTERNAL: Re: Notification - Smilax-Mimosa Sewer Improvements Project Hi Susan,
Can you please resend the notification letter,we are having problem opening the file on this end.

Hope all is well,
Carmen Mojado
President of Saving Sacred Sites
Saving Sacred Sites I Vista, CA
cjmojado()icloud.com
On Dec 13, 2021, at 1:33 PM, ZamudioGurrola, Susan wrote:

Dear Ms. Mojado,
Please see the attached notification letter and maps for the Smilax-Mimosa Sewer Improvements Project. A copy of this letter is also being sent via USPS mail.

Thank you for your time,
Susan Zamudio-Gurrola, MHP I Senior Architectural Historian I she/her 5051 Verdugo Way, Suite 300 1 Camarillo, CA 93012 1 [0] 805-384-4090 1 [M] 310-592-0815 [email protected] I www.mbakerintl.com f V Q in O Michael Baker e foe o E

03/08/2022 07 111 of 159

ZamudioGurrola, Susan
From: ZamudioGurrola, Susan
Sent: Friday, December 17, 2021 9:22 AM
To: Carmen Mojado
Subject: RE: EXTERNAL: Re: Notification - Smilax-Mimosa Sewer Improvements Project Attachments: 2021-12-13_Notification Letter-SLR Band of Mission Indians.pdf Yes,of course. A copy is attached. Also,the hard copy of the letter was delivered on December 15, 2021 to 1889 Sunset Drive, Vista, CA according to the USPS delivery receipt.

Thank you,
Susan Zamudio-Gurrola, MHP I Senior Architectural Historian I she/her Michael Baker International I We Make a Difference
5051 Verdugo Way, Suite 300 1 Camarillo, CA 93012
[0] 805-384-4090 1 [M] 310-592-0815
[email protected] I www.mbakerintl.com From: Carmen Mojado
Sent: Friday, December 17, 20219:10 AM
To:ZamudioGurrola, Susan
Subject: EXTERNAL: Re: Notification -Smilax-Mimosa Sewer Improvements Project Hi Susan,
Can you please resend the notification letter,we are having problem opening the file on this end.

Hope all is well,
Carmen Mojado
President of Saving Sacred Sites
Saving Sacred Sites I Vista, CA
cimoiado(cDicloud.com
On Dec 13, 2021, at 1:33 PM, ZamudioGurrola, Susan wrote:

Dear Ms. Mojado,
Please see the attached notification letter and maps for the Smilax-Mimosa Sewer Improvements Project. A copy of this letter is also being sent via USPS mail.

Thank you for your time,
Susan Zamudio-Gurrola, MHP I Senior Architectural Historian I she/her 5051 Verdugo Way, Suite 300 1 Camarillo, CA 93012 1 [0] 805-384-4090 1 [M] 310-592-0815 [email protected] I www.mbakerinti.com f %F Q in O 03/08/2022 07 112 of 159

Michael Baker
e foe o L

03/08/2022 07 113 of 159

10-U UNITED STATES
POST13L SERVICE
December 15, 2021
Dear Susan Zamudio Gurrola:

The following is in response to your request for proof of delivery on your item with the tracking number:
9514 8066 8321 1347 7416 31.

Status: Delivered, Left with Individual
Status Date /Time: December 15, 2021, 12:02 pm
Location: VISTA, CA 92081
Postal Product: First-Class Mail°
Extra Services: Certified MaiITM
Return Receipt Electronic
ShipmentDetails
Weight: 1.0oz
Destination Delivery Address
Street Address: 1889 SUNSET DR
City, State ZIP Code: VISTA, CA 92081-6314
Recipient •
C 1 1!l77
Signature of Recipient: 4✓ 16_�_;
1889 SUNSET DR VISTA,CA
92081
Address of Recipient:

Note: Scanned image may reflect a different destination address due to Intended Recipient's delivery instructions on file.

Thank you for selecting the United States Postal Service°for your mailing needs. If you require additional assistance, please contact your local Post Office TM or a Postal representative at 1-800-222-1811.

Sincerely,
United States Postal Service°
475 L'Enfant Plaza SW
Washington, D.C. 20260-0004
03/08/2022 C7 114 of 159

ZamudioGurrola, Susan
From: ZamudioGurrola, Susan
Sent: Monday, December 27, 2021 12:04 PM
To: Carmen Mojado
Subject: FW: EXTERNAL: Re: Notification - Smilax-Mimosa Sewer Improvements Project Attachments: 2021-12-13_Notification Letter-SLR Band of Mission Indians.pdf Hello again,
I wanted to follow-up and check if you have any comments or questions regarding the Smilax-Mimosa Sewer Improvements Project?
Thanks for your time,
Susan Zamudio-Gurrola, MHP I Senior Architectural Historian I she/her Michael Baker International We Make a Difference
5051 Verdugo Way, Suite 300 Camarillo, CA 93012
[0] 805-384-4090 1 [M] 310-592-0815
[email protected] I www.mbakerintl.com From:ZamudioGurrola, Susan
Sent: Friday, December 17, 2021 9:22 AM
To: Carmen Mojado
Subject: RE: EXTERNAL: Re: Notification -Smilax-Mimosa Sewer Improvements Project Yes, of course.A copy is attached. Also,the hard copy of the letter was delivered on December 15, 2021 to 1889 Sunset Drive, Vista, CA according to the USPS delivery receipt.

Thank you,
Susan Zamudio-Gurrola, MHP I Senior Architectural Historian I she/her Michael Baker International We Make a Difference
5051 Verdugo Way, Suite 300 Camarillo, CA 93012
[0] 805-384-4090 1 [M] 310-592-0815
[email protected] I www.mbakerintl.com From: Carmen Mojado
Sent: Friday, December 17, 2021 9:10 AM
To:ZamudioGurrola, Susan
Subject: EXTERNAL: Re: Notification -Smilax-Mimosa Sewer Improvements Project Hi Susan,
Can you please resend the notification letter, we are having problem opening the file on this end.

Hope all is well,
Carmen Mojado
President of Saving Sacred Sites
03/08/2022 07 115 of 159

APPENDIX C:

GEOTECHNICAL INVESTIGATION
03/08/2022 C7 116 of 159

GEOTECHNICAL INVESTIGATION

SMILAX-MIMOSA SEWER
IMPROVEMENTS (CIP 8301 )

COUNTY OF SAN DIEGO AND

CITY OF SAN MARCOS, CALIFORNIA
",11,621 N
C X s
T I PREPARED FOR
EN V11110

T I L
TC CONSTRUCTION COMPANY, INC.

SANTEE, CALIFORNIA
SEPTEMBER 3, 2021
PROJECT NO. G2689-22-01
/ / C7 117 of 159

GEOCOlaf
INC ❑ RP❑ RATED
G E 0 T E C H N I C A L ■ E N V I R O N M E N T A L M A T E R I A L Sff Project No. G2689-22-01
September 3,2021
TC Construction Company,Inc.
10540 Prospect Avenue
Santee, California 92071
Attention: Mr. Elan Schier
Subject: GEOTECHNICAL INVESTIGATION
SMILAX-MIMOSA SEWER IMPROVEMENTS (CIP 8301)

COUNTY OF SAN DIEGO AND CITY OF SAN MARCOS, CALIFORNIA
Dear Mr. Schier:

In accordance with your request and authorization of our Proposal No. LG-20343 dated August 11, 2020 (revised August 13, 2020), Task 2, we performed our geotechnical investigation to evaluate the underlying soil and geologic conditions and potential geologic hazards for the subject project.

The accompanying report presents the results of our study and conclusions and recommendations pertaining to geotechnical aspects of the proposed project. The site is suitable for the proposed improvements provided the recommendations of this report are incorporated into the design and construction of the planned project.

Should you have questions regarding this report, or if we may be of further service, please contact the undersigned at your convenience.

Very truly yours,

GEOCON INCORPORATED
Yong Wang Michael C. Ertwine
GE 2775 `� Q�gFESs�ON CEG 2659
YW:MCE:arm � micKAELC.

N0.2775 m ��
w m O ERTWINE
d S� „ d �{
(e-mail) Addressee No.2659
s�pr�CHN`GP,P * CERTIFIED

ENGINEERING
�TFOF CALIFS N� GEOLOGIST
QF CA��F��
6960 Flanders Drive ■ 5an Diego,California 92121-297A Mi Telephone 858.558.6900 ■ Fax 858.558.6159 03/08/2022 C7 118 of 159

TABLE OF CONTENTS

1. PURPOSE AND SCOPE.................................................................................................................4

2. SITE AND PROJECT DESCRIPTION...........................................................................................5

3. GEOLOGIC SETTING....................................................................................................................5

4. SOIL AND GEOLOGIC CONDITIONS ........................................................................................6

4.1 Artificial Fill(Qaf) ................................................................................................................7

4.2 Santiago Formation(Ts)........................................................................................................7

4.3 Tonalite (Granitic Rock) (Kt)................................................................................................7

5. GROUNDWATER..........................................................................................................................7

6. GEOLOGIC HAZARDS .................................................................................................................8

6.1 Regional Faulting and Seismicity..........................................................................................8

6.2 Liquefaction...........................................................................................................................9

6.3 Storm Surge, Tsunamis, and Seiches.....................................................................................9

6.4 Landslides............................................................................................................................10

6.5 Erosion.................................................................................................................................10

7. CONCLUSIONS AND RECOMMENDATIONS.........................................................................11

7.1 General.................................................................................................................................11

7.2 Excavation and Soil Characteristics....................................................................................11

7.3 Temporary Slope and Excavation Support..........................................................................12

7.4 Jacking Pit and Thrust Block...............................................................................................13

7.5 Trenchless Construction......................................................................................................14

7.6 Ground Control and Improvement.......................................................................................15

7.7 Bearing Capacity for Pipeline..............................................................................................15

7.8 Design of Flexible Pipe.......................................................................................................16

7.9 Corrosion.............................................................................................................................16

7.10 Dewatering...........................................................................................................................17

7.11 Pipe Bedding and Trench Backfill.......................................................................................17

7.12 Suitability of Excavated Materials as Pipe Bedding and Trench Backfill...........................17

7.13 Preliminary Pavement Recommendations...........................................................................18

7.14 Plan Review.........................................................................................................................18

APPENDIX A

FIELD INVESTIGATION

APPENDIX B

LABORATORY TESTING

LIST OF REFERENCES
03/08/2022 C7 119 of 159

GEOLOGIC RECONNAISSANCE

1. PURPOSE AND SCOPE
This report presents the results of our geotechnical investigation for the proposed Smilax-Mimosa Sewer Improvements (CIP 8301) project in the County of San Diego and the City of San Marcos, California(see Vicinity Map). In general,the project is located near Smilax Road and Mimosa Avenue where they are adjacent to State Route 78 (SR-78) corridor. The purpose of this geotechnical investigation is to evaluate the surface and subsurface geologic conditions, construction conditions along the project alignment, and to provide recommendations regarding geotechnical aspects of constructing the proposed sewer improvements.

PROPOSED ALIGNMENT
e
l
Vicinity Map
The scope of this investigation included reviewing readily available published and unpublished geologic literature (see List of References), performing a field investigation and laboratory testing, performing engineering analyses and preparing this report. We also performed a partial observation of the subsurface condition during the recent potholing operations arranged by TC Construction,Inc.

We performed a field investigation on August 5 and 6, 2021, that included drilling 5 small diameter exploratory borings to a maximum depth of approximately 19%2 feet. Boring logs and other details of Geocon Project No.G2689-22-01 -4- September 3,2021 03/08/2022 C7 120 of 159

the field investigation are presented in Appendix A. The approximate locations of the borings are shown on Site Plan/Geologic Map, Figure 1. We tested selected soil samples obtained during the field investigation to evaluate pertinent physical and chemical properties for engineering analyses and to assist in providing recommendations for the installation of the sewer pipeline. Details of the laboratory tests and a summary of the test results are presented in Appendix B.

The recommendations presented herein are based on analysis of the data obtained from the exploratory borings,laboratory test results,and our experience with similar soil and geologic conditions.

2. SITE AND PROJECT DESCRIPTION
The final project plans are not available for our use at the time of preparing this report. Based on the currently available project plans and information, we understand that the proposed improvements consist of approximately 1,257 LF of new 12-inch diameter PVC sewer extending from Station 10+00 to Station 22+57. The Site Plan/Geologic Map, Figure 1 shows the approximate plan view and profile view of the proposed sewer alignment. The surface elevations along the project alignment range between approximately 434 and 444 feet above mean sea level(MSL), and the planned invert levels of the sewer pipeline are between approximately 422 and 433 feet(MSL).

We further understand that the majority of the proposed improvements will be constructed via cut-and- cover trenching construction methods. Trenchless construction methods are considered for 2 segments due to the presence of existing Reinforced Concrete Box (RCB) culverts and access restraints near the Stations 10+57 and 17+20 as depicted on the profile view of Figure 1, Site Plan/Geologic Map. The trenchless construction methods may include pipejacking and/or pipe ramming.

The site description and proposed development are based on a site reconnaissance, review of the geologic literature, and currently available project information. If final project plans differ from those described herein, Geocon Incorporated should be contacted for review of the plans and possible revisions to this report.

3. GEOLOGIC SETTING
Regionally, the site is located in the Peninsular Ranges geomorphic province. The province is bounded by the Transverse Ranges to the north, the San Jacinto Fault Zone on the east, the Pacific Ocean coastline on the west, and the Baja California on the south. The province is characterized by elongated northwest-trending mountain ridges separated by straight-sided sediment-filled valleys. The northwest trend is further reflected in the direction of the dominant geologic structural features of the province that are northwest to west-northwest trending folds and faults, such as the nearby Rose Canyon fault zone.

The site is within the coastal plain of San Diego County. The coastal plain is underlain by a thick sequence of relatively undisturbed and non-conformable sedimentary bedrock units that thicken to the Geocon Project No.G2689-22-01 -5- September 3,2021 03/08/2022 C7 121 of 159

west and range in age from Upper Cretaceous age through the Pleistocene-age which have been deposited on Cretaceous-age to Jurassic-age igneous and volcanic bedrock. Geomorphically, the coastal plain is characterized by a series of 21, stair-stepped marine terraces (younger to the west) which have been dissected by westly flowing drainages. The coastal plain is a relatively stable block that is dissected by relatively few faults consisting of the potentially active La Nacion Fault Zone and the active Rose Canyon Fault Zone.

Locally,the site is located on the western margin of the coastal plain. Younger marine and non-marine sedimentary units unconformably overly older the intrusive igneous rock and make up the geologic sequence along the alignment. These geologic units consist the Eocene-age Santiago Formation, and the Cretaceous-age Granitic Rock (Tonalite). We expect artificial fills were placed during historic development in the local area along with the construction of SR-78. We did not encounter alluvium within the current exploratory borings. The Regional Geologic Map(Kennedy Tan, 2008)presents the geologic units within the vicinity of the site.

A
I �� PROJECT ALIGNMEN
}} TTsa
'
Kt
rJ_ �
41 r
GEDCON LEGEND: N ._, f•�
T^ - Qya...Young n"AlhVILM
IV` j� q�.. quaternary Nluvium Tsa.- Santiago FD=atlon 10 _ Kt.. Tanalite(Grenft Rack) �J
Mn... Santiaco Peak Metawlcar „
J
Qya
I -
Regional Geologic Map

4. SOIL AND GEOLOGIC CONDITIONS
We encountered one surficial soil units (consisting of artificial fill) and two formational units (consisting of the Santiago Formation, and Granitic Rock) during our field exploration. The occurrence, distribution, and description of each unit encountered is shown on the Site Plan/Geologic Geocon Project No.G2689-22-01 -6- September 3,2021 03/08/2022 C7 122 of 159

Map, Figure 1, and on the boring logs in Appendix A. The surficial soil and geologic units are described herein in order of increasing age.

4.1 Artificial Fill (Qaf)
We encountered artificial fill in each of the borings to depths ranging from about 15 to 18 feet below the existing roadway surface. In general,the upper 5 feet of the artificial fill consists of medium dense silty sand and clayey sand, and stiff sandy clay. The artificial fill at depths of greater than 5 feet generally consists of stiff to very stiff, sandy to fat clays with few layers of gravel within the fill matrix.

4.2 Santiago Formation (Ts)
We encountered the Tertiary-age Santiago Formation in Boring B-2 through B-5, below the artificial fill to the maximum depth explored of 19%2 feet. This sedimentary geologic unit encountered consists of very stiff to hard, sandy to clayey siltstones, and dense clayey sandstone.

4.3 Tonalite (Granitic Rock) (Kt)
We encountered Cretaceous-age granitic rock in Boring B-1 at approximately 15 feet below the artificial fill. In published literature this geologic unit is described as "Tonalite"because of the mostly coarse-grained texture, and composition of hornblende and biotite minerals (Kennedy and Tan, 2005).

The Granitic Rock in this geomorphic region is generally at various stages of the weathering process and possesses a medium- to coarse-grained phaneritic (visible) texture with corestones interspersed within the unit. The granitic rock unit encountered in Boring B-1, to the maximum extent explored of 19%2 feet, consists of completely weathered (saprolite) to moderately weathered, weak to moderately strong granitic rock,which excavates to a silty, fine to coarse-grained sand. This unit typically exhibits low expansion potential and adequate shear strength.

5. GROUNDWATER
We did not encounter groundwater or seepage during our site investigation. However, it is not uncommon for shallow seepage conditions to develop where none previously existed when sites are irrigated or infiltration is implemented. Seepage is dependent on seasonal precipitation, irrigation, land use, among other factors, and varies as a result. Proper surface drainage will be important to future performance of the project. We do not expect groundwater to be encountered during construction of the proposed improvements.

Geocon Project No.G2689-22-01 -7- September 3,2021 03/08/2022 C7 123 of 159

6. GEOLOGIC HAZARDS

6.1 Regional Faulting and Seismicity
A review of the referenced geologic materials and our knowledge of the general area indicate the site is not underlain by active, inactive, or potentially active faults. An active fault is defined by the California Geological Survey (CGS) as a fault showing evidence for activity within the last 11,700 years. The site is not located within a State of California Earthquake Fault Zone.

The USGS has developed a program to evaluate the approximate location of faulting in the area of properties. The following figure presents the location of the existing faulting in the San Diego County and Southern California region. The fault traces are shown as solid, dashed and dotted that represent well-constrained, moderately constrained and inferred, respectively. The fault line colors represent faults with ages less than 150 years (red), 15,000 years (orange), 130,000 years (green), 750,000 years (blue)and 1.6 million years(black).

F�w
�RnnsA
Ocean side 'Vista
Carlsbad'
�n Marcos
Escondido'
Ran —
nor, .Ramona
Enrinika� -` saNr�exvn vn� t+
$.

Faults in Southern California
The San Diego County and Southern California region is seismically active. The following figure presents the occurrence of earthquakes with a magnitude greater than 2.5 from the period of 1900 through 2015 according to the Bay Area Earthquake Alliance website.

Geocon Project No.G2689-22-01 -8- September 3,2021 03/08/2022 C7 124 of 159

Earthquakes � r ■ ■
M5q 190a19B0 C lamella ���� ■ �' ..

O _°{J' •
'M2.5'.198aJan 2015 O • • � "' ' a
f All.rt:•:�k V p p •
Magrritude �f,,:. F�aia p O'
�/�. • •
O 0 Cam Pindl`Wn O°.c r moire �� a 000 Corps Bari+ •• � ■
M3. M4. M5+ MB+ M7. s • C
• �n ti
i • 0 •
1000-100 1980.1900 1000.2900 2000.2010 2010.2015
Oceanside Vlsla
■
na7a Celle. O •:.,tkl.,•I SITE •
• 1 an F.larr.:
■
• •4- V
■ rn
O• iZ
Pows• op
. � � • Tj MGaS hl:amar
AH
Earthquakes in Southern California
Considerations important in seismic design include the frequency and duration of motion and the soil conditions underlying the site. Seismic design of structures should be evaluated in accordance with the California Building Code(CBC) guidelines currently adopted by the local agency.

6.2 Liquefaction
Liquefaction typically occurs when a site is located in a zone with seismic activity, onsite soils are cohesionless or silt/clay with low plasticity, groundwater is encountered within 50 feet of the surface and soil densities are less than about 70 percent of the maximum dry densities. If the four previous criteria are met, a seismic event could result in a rapid pore water pressure increase from the earthquake-generated ground accelerations. Due to the lack of a permanent, near-surface groundwater table and the very dense nature of the underlying formational materials, liquefaction potential for the site is considered very low.

6.3 Storm Surge, Tsunamis, and Seiches
Storm surges are large ocean waves that sweep across coastal areas when storms make landfall. Storm surges can cause inundation, severe erosion and backwater flooding along the waterfront. The site is located approximately 7'/z miles from the Pacific Ocean and an elevation of approximately 430 feet or greater above Mean Sea Level (MSL); therefore, the potential of storm surges affecting the site is considered low.

Geocon Project No.G2689-22-01 -9- September 3,2021 03/08/2022 C7 125 of 159

A tsunami is a series of long period waves generated in the ocean by a sudden displacement of large volumes of water. Causes of tsunamis include underwater earthquakes, volcanic eruptions, or offshore slope failures. We consider the risk of a tsunami hazard at the site to be low due to the distance from the Pacific Ocean and the site elevations.

A seiche is a run-up of water within a lake or embayment triggered by fault- or landslide-induced ground displacement. The site is not located adjacent to a body of water. Therefore, we consider the potential for seiches to impact the site low.

6.4 Landslides
We did not observe evidence of previous or incipient slope instability at the site during our study.

Published geologic mapping indicates that landslides are not present on or adjacent to the site.

Therefore,we opine the potential for a landslide is not a concern for this project.

6.5 Erosion
The site is gently sloping to the northwest and is not located adjacent to the Pacific Ocean or a free- flowing drainage where active erosion is occurring. We do not expect erosion to be a concern for this project. In addition, we expect the proposed improvement would not increase the potential for erosion if properly designed.

Geocon Project No.G2689-22-01 - 10- September 3,2021 03/08/2022 C7 126 of 159

7. CONCLUSIONS AND RECOMMENDATIONS

7.1 General

7.1.1 From a geotechnical engineering standpoint, it is our opinion that subsurface conditions along the project alignment are suitable for the proposed pipeline improvement, provided the recommendations presented herein are implemented in design and construction of the project.

7.1.2 Our field investigation indicates artificial fill, Santiago Formation and granitic rock underlie the proposed sewer alignment. The proposed sewer will likely be installed within artificial fill and Santiago Formation.

7.1.3 We did not encounter groundwater in our borings. Other than nuisance perched water, groundwater is not expected to significantly affect the proposed construction.

7.1.4 With the exception of possible strong seismic shaking, significant geologic hazards were not observed or are known to exist on the site that would adversely affect the proposed improvement.

7.2 Excavation and Soil Characteristics

7.2.1 Excavation of the in-situ soil should be possible with moderate to heavy effort using conventional heavy-duty equipment. Excavation of the formational materials will require very heavy effort and may generate oversized material using conventional heavy-duty equipment during the grading operations. If granitic rock is encountered, very heavy effort or rock breaking could be needed to excavate.

7.2.2 The soil encountered in the field investigation is considered to be "non-expansive" and "expansive" (expansion index [EIl of less than 20 and greater than 20, respectively) as defined by 2019 California Building Code (CBC) Section 1803.5.3. We expect a majority of the soil encountered possess a "very low" to "medium" expansion potential (expansion index of 90 or less) in accordance with ASTM D 4829. Table 7.2 presents soil classifications based on the expansion index.

TABLE 7.2

EXPANSION CLASSIFICATION BASED ON EXPANSION INDEX
Expansion Index(EI) ASTM 1 4829 Expansion 2019 CBC Expansion Classification
0-20 Very Low Non-Expansive
21—50 Low
51—90 Medium
91 —130 High Expansive
Greater Than 130 Very High
Geocon Project No.G2689-22-01 - 11 - September 3,2021 03/08/2022 C7 127 of 159

7.3 Temporary Slope and Excavation Support

7.3.1 Temporary excavations should be made in conformance with OSHA requirements. The artificial fill should be considered a Type B (Type C soil if seepage or groundwater is encountered) soil and the Santiago Formation and granitic rock should be considered a Type A soil (Type B soil if seepage or groundwater is encountered) in accordance with OSHA requirements. However, the contractor's competent person should confirm and make the final decision of these soil types based on the soils encountered during construction. In general, special shoring requirements will not be necessary if temporary excavations will be less than 5 feet in height. Temporary excavations greater than 5 feet in height, however, should be sloped back at an appropriate inclination. These excavations should not be allowed to become saturated or to dry out. Surcharge loads should not be permitted to a distance equal to the height of the excavation from the top of the excavation. The top of the excavation should be a minimum of 15 feet from the edge of existing improvements.

Excavations steeper than those recommended or closer than 15 feet from an existing surface improvement should be shored in accordance with applicable OSHA codes and regulations.

7.3.2 Temporary, unsupported cuts in undocumented fill should not be steeper than 1:1 (horizontal:vertical)up to 20 feet in height. Again,the contractor's competent person should make the final decision on excavation inclinations based on conditions encountered during construction. In general, excavations in the Santiago Formation and granitic rock can be made with slopes of 3/4:1. Excavation slopes should be checked by an engineering geologist or geotechnical engineer to evaluate the existence of zones of weakness, groundwater seepage, or adversely oriented fractures that could form local areas of slope instability to aid the contractor's competent person in selecting appropriate inclinations. Flatter slopes, shoring or safety shields will be needed in areas where sloughing, raveling or running is encountered. The contractor should be made aware of this potential and have the equipment available on site to flatten slopes or install shoring if necessary. Loose or easily erodible soils may be present locally and should be removed from the faces of excavation side slopes before personnel begin work below the slopes.

7.3.3 Where a portable safety shield is used to protect workers, the sidewall of the trench is not directly supported. Therefore, use of a shield generally should be limited to open areas to minimize the effects on adjacent improvements or settlement of the ground surface behind the shield. Shields should be sized to minimize clearance between trench and shield walls.

Unsupported trenches should be backfill immediately after removal of the shield.

7.3.4 Temporary cantilevered shoring can be designed for an active soil pressure equivalent to the pressure exerted by a fluid density of 25 pcf. Temporary multi-braced shoring should be designed using a lateral pressure envelope acting uniformly on the back of the shoring and Geocon Project No.G2689-22-01 - 12- September 3,2021 03/08/2022 C7 128 of 159

applying a pressure equal to 16H, where H is the height of the shoring in feet (resulting pressure in pounds per square foot). Also, lateral earth pressure due to the surcharging effects of adjacent structures or traffic loads should be considered where appropriate during design of the shoring system.

7.3.5 Passive soil pressure resistance for embedded portions of soldier piles can be estimated based on an equivalent fluid weight of 300 pounds per cubic foot(pcf) for artificial fill, and 400 pcf for Santiago Formation and granitic rock.

7.3.6 Lateral movement of shoring is associated with vertical ground settlement outside of the excavation. It is important that the shoring system allow limited amounts of lateral displacement. We recommend that horizontal movements of the shoring wall be accurately monitored and recorded during excavation if adjacent settlement sensitive improvements are present.

7.3.7 Lagging should keep pace with excavation. The excavation should not be advanced deeper than three feet below the bottom of lagging at any time. These unlagged gaps of up to 3 feet should only be allowed to stand for short periods of time in order to decrease the probability of soil instability and should never be unsupported overnight. Backfilling should be conducted when necessary between the back of lagging and excavation sidewalls to reduce sloughing in this zone, and all voids should be filled by the end of each day.

7.3.8 The condition of existing streets and other structures around the perimeter of the planned excavation should be documented prior to the start of shoring and excavation work. Special attention should be given to documenting existing cracks or other indications of differential settlement within these adjacent pavements and other improvements.

7.4 Jacking Pit and Thrust Block

7.4.1 We understand that trenchless construction methods including pipejacking and/or ramming are considered for the installation or propose sewer beneath the 2 existing RCB boxes near the Stations 10+57 and 17+20.

7.4.2 Shoring for the excavation of jacking and reception pits, if applicable, should be designed utilizing the parameters in Section 7.3. Shoring should generally be extended 10 feet or more below the excavation bottoms if sheet piles or similar systems are used in soil sites.

Sealing sheet-pile into formation may also be utilized to accommodate bottom heave if groundwater is encountered and formational material is competent. If dewatering is used to drain only the interior of the pit, inclusion of hydrostatic pressure is considered necessary.

Geocon Project No.G2689-22-01 - 13- September 3,2021 03/08/2022 C7 129 of 159

7.4.3 Excavated soil should not be placed within a horizontal distance equal to the depth of excavation from the edge of the excavation. If soil is stored within this zone, a vertical surcharge pressure of 130H psf(where H equals the height of the stockpiled soils) should be added to the above active pressures.

7.4.4 If heavy seepage and/or groundwater is encountered, bottom heave should be taken into consideration if the shoring system represents an impermeable barrier to water. A layer of freely draining gravel or crushed rock (2 or more feet thick) would assist in reducing the potential for piping as well as to provide a working pad for trenchless construction.

7.4.5 Thrust blocks used to resist lateral loads from the connecting pipes can be designed with an allowable lateral bearing pressure of 300 psf per foot of depth for artificial fill, and 400 psf per foot for Santiago Formation and granitic rock. Frictional resistance between the thrust restraint system and the supporting soil can be calculated using an ultimate friction factor of

0.4. Allowable lateral loads and friction values should be determined by the designer using factors of safety appropriate to the load conditions.

7.4.6 The design and construction of thrust block should take into account the potential for settlement behind the supports, including settlement resulting from deflection of bracing.

7.4.7 Any fill associated with the jacking/receiving pits should be mechanically compacted in layers to the finish ground surface. Backfill should be compacted to at least 90 percent of maximum dry density as determined by ASTM D 1557 at or slightly above optimum moisture content.

7.5 Trenchless Construction

7.5.1 Pipe jacking and/or microtunneling should be constructed in accordance with the Greenbook Standard Specifications for Public Works Construction, Sections 306-2 and/or 306-8, to maintain the line and grade of the proposed pipe. All underground openings should be constructed in strict compliance with the California Department of Industrial Relations, Division of Occupational Safety and Health, Mining and Tunneling Unit, OSHA, and Cal- OSHA for work safety and public liability.

7.5.2 Along the proposed trenchless construction near the approximate Station 10+57, granitic rock with varying degree of weathering were encountered few feet below the proposed sewer invert level in our boring. The contractor should select the appropriate drill bits or tunneling machine cutting tools suitable to accommodate cemented zones and resistant materials if encountered.

Geocon Project No.G2689-22-01 - 14- September 3,2021 03/08/2022 C7 130 of 159

7.5.3 The line friction load acting on the pipeline as it is jacked behind the shield is influenced by many factors and is therefore difficult to estimate. However, line friction load during jacking operation can be reduced by the application of lubricating fluids, such as bentonite-based lubricants or polymer-based lubricants. The selection and application of such a lubricant should be determined by the contractor.

7.6 Ground Control and Improvement

7.6.1 Earth pressure counter-balance tunneling systems are available which rely on mechanical systems to balance earth pressures. By reducing changes in pressures experienced by the ground as tunneling proceeds, potential deflections at the ground surface can be reduced.

The type of tunneling,drilling,pipejacking, or pipe ramming system used can be selected by the contractor. It is important that the contractor be provided with complete soil, underground utility, and groundwater information so that appropriate equipment can be mobilized. In addition, providing adequate information before the project starts will be vital if claims for changed conditions are filed during construction.

7.6.2 The contractor should monitor existing pavement areas and adjacent improvements for surface deflection(settlement or heave) during construction so that appropriate modification to the excavation and shoring system as well as pipejacking, pipe bursting, pipe ramming, directional drilling, and microtunneling equipment are implemented to minimize the surface deflection in a timely manner.

7.6.3 In addition to existing improvements, other underground utilities may exist near and above the proposed pipe. The actual depths and locations of some of these pipes may not be known accurately. The bedding for these pipes may also carry significant quantities of water. To reduce the settlement potential and avoid damaging adjacent pipelines (by undermining the pipe if the bedding material is encountered in the heading), the bedding material supporting the overlying pipe can be stabilized locally using cement grout from the ground surface.

7.7 Bearing Capacity for Pipeline

7.7.1 Our test borings indicated that on-site soils generally have adequate bearing capacity for support of the proposed pipeline. If unsuitable materials, as determined during construction by the engineer, are encountered near trench bottom elevations, they should be overexcavated to firm materials, in accordance with the latest edition of the Greenbook, Standard Specifications for Public Works Construction. The weight of the pipe, water and compacted backfill above the pipe will not result in a significant increase in load over the present overburden. Consequently,pipeline settlement should be negligible.

Geocon Project No.G2689-22-01 - 15- September 3,2021 03/08/2022 C7 131 of 159

7.8 Design of Flexible Pipe

7.8.1 Loading on the pipeline will depend on the depth of cover and the unit weight of compacted backfill. An average total unit weight of 130 pounds per cubic feet (pcf) can be used to calculate the overburden pressure on the pipe. The modulus of soil reaction (E') used in determination of pipe deflection depends mainly on the compacted densities of bedding and backfill materials. It also varies slightly with the depth of pipe and the soil type. The estimated soil modulus for the subject pipeline is approximately 1,700 pounds per square inch (psi), assuming bedding materials will be imported and the backfill materials will be derived locally and compacted to a minimum relative compaction of 90 percent (based on ASTM D 1557).

7.9 Corrosion

7.9.1 We tested soil sample for potential of hydrogen (pH) and resistivity, water-soluble sulfate content, and chloride content laboratory tests to aid in evaluating the corrosion potential to subsurface structures. Appendix B presents the laboratory test results. The test results indicate the on-site materials at the location tested possesses "SO" sulfate exposure to concrete structures as defined by 2019 CBC Section 1904 and ACI 318-14 Chapter 19. The presence of water-soluble sulfates is not a visually discernible characteristic; therefore, other soil samples from the site could yield different concentrations. Additionally, over time landscaping activities (i.e., addition of fertilizers and other soil nutrients) may affect the concentration.

7.9.2 According to Caltrans Corrosion Guidelines (Version 3.2, May 2021), a site is considered corrosive to structural elements if one or more of the following conditions exist for the representative soil and/or water samples taken at the site: chloride concentration is 500 ppm or greater, sulfate concentration is 1500 ppm or greater, or the pH is 5.5 or less. Caltrans LRFD Memo to Designer 3-1 (MTD 3-1, June 2014) provides the similar criteria with an additional condition that the soil has a minimal resistivity of 1000 ohm-centimeters or less.

The soil sample we tested does not meet the definition of a corrosive environment per Caltrans Corrosion Guidelines.

7.9.3 Geocon Incorporated does not practice in the field of corrosion engineering. If corrosion sensitive improvements are planned, we recommend that further evaluations by a corrosion engineer be performed to incorporate the necessary precautions to avoid premature corrosion on buried metal pipes and concrete structures in direct contact with the soils.

Geocon Project No.G2689-22-01 - 16- September 3,2021 03/08/2022 C7 132 of 159

7.10 Dewatering

7.10.1 Groundwater was not encountered during our field investigation that was generally extended below the currently proposed sewer invert level. Significant amounts of seepage, if encountered during pit and/or trench excavation, should be pumped away to facilitate the installation of pipeline.

7.11 Pipe Bedding and Trench Backfill

7.11.1 Pipe bedding is defined as that material supporting, surrounding and extending to 1 foot above the top of the pipe, in accordance with the latest edition of the Greenbook, Standard Specifications for Public Works Construction. Materials used for pipe bedding should consist of free draining granular soil such as sand, gravel or crushed aggregate containing no rocks greater than 1 inch in maximum dimension and having a sand equivalent of not less than 30. Pipe bedding should conform to the Greenbook. Placement should be performed in accordance with these specifications.

7.11.2 Trench backfill is the material placed above the bedding, starting at 1 foot above the top of the pipe. Backfill should be predominately granular and should contain no organic debris and no rocks greater than 6 inches in maximum dimension.

7.11.3 Trench backfill should be mechanically compacted. Flooding or jetting should not be allowed. In general, backfill should be placed in lifts 8 inches or less in loose thickness, moisture conditioned to near the optimum moisture content, and compacted to at least 90 percent relative compaction based on the ASTM D 1557 laboratory test method. The upper 12 inches of backfill beneath paved areas should be compacted to at least 95 percent relative compaction. All references to optimum moisture content and relative compaction in this report are based on the ASTM D 1557 test method.

7.12 Suitability of Excavated Materials as Pipe Bedding and Trench Backfill

7.12.1 Soils excavated from on-site materials will have variable quantities of fine particles and oversized materials are not expected to be suitable for use as pipe bedding without processing but will generally be suitable for use as trench backfill (without oversize materials), from a geotechnical engineering standpoint. A sample of on-site materials was tested for sand equivalent that yields a result of 21 (see Appendix B).

7.12.2 All deleterious materials should be replaced and not be used in backfill. Disposal of unsuitable materials should follow relevant environmental and governmental regulations.

No materials considered hazardous or that would require special handling, removal and disposal were encountered in boring.

Geocon Project No.G2689-22-01 - 17- September 3,2021 03/08/2022 C7 133 of 159

7.13 Preliminary Pavement Recommendations

7.13.1 The existing pavement along the project alignment appears to be in poor to fair condition.

The thickness of asphalt concrete encountered in our borings generally ranged between 5 and 6 inches. We performed laboratory R-Value test on a collected subgrade soil sample to provide preliminary recommendations for structural pavement sections for the subject roadway. An R-Value of 16 was tested for a sample taken from the upper 5 feet of subgrade soil in Boring B-5. For the purposes of preliminary design, we recommended 5 inches of asphalt concrete over 15 inches of Class II aggregate base for the pavement structural sections assuming a traffic index identify (TI) of 8.0. Subgrade soils with the R-Value less than the recommended for design (16), if encountered during construction, should be mitigated and/or replacement.

7.13.2 The upper 12 inches of the subgrade soil should be compacted to a dry density of at least 95 percent of the laboratory maximum dry density based on ASTM D 1557 near to slightly above optimum moisture content beneath pavement sections.

7.13.3 Base materials should conform to Section 26-1.028 of the Standard Specifications for The State of California Department of Transportation (Caltrans) with a 3/4-inch maximum size aggregate. The asphalt concrete should conform to Section 203-6 of the Standard Specifications for Public Works Construction (Greenbook). The Class 2 base material should also be compacted to a dry density of at least 95 percent of the laboratory maximum dry density based on ASTM D 1557 near to slightly above optimum moisture content beneath pavement sections.

7.13.4 Asphalt concrete should be compacted to a density of at least 95 percent of the laboratory Hveem density in accordance with ASTM D 2726.

7.14 Plan Review

7.14.1 We recommend that the final plans and specifications be reviewed by Geocon Incorporated to evaluate if the plans and details have been prepared in substantial conformance with the recommendations contained within this report.

Geocon Project No.G2689-22-01 - 18- September 3,2021 03/08/2022 C7 134 of 159

LIMITATIONS AND UNIFORMITY OF CONDITIONS

1. The firm that performed the geotechnical investigation for the project should be retained to provide testing and observation services during construction to provide continuity of geotechnical interpretation and to check that the recommendations presented for geotechnical aspects of site development are incorporated during site grading, construction of improvements, and excavation of foundations. If another geotechnical firm is selected to perform the testing and observation services during construction operations, that firm should prepare a letter indicating their intent to assume the responsibilities of project geotechnical engineer of record. A copy of the letter should be provided to the regulatory agency for their records. In addition, that firm should provide revised recommendations concerning the geotechnical aspects of the proposed development, or a written acknowledgement of their concurrence with the recommendations presented in our report. They should also perform additional analyses deemed necessary to assume the role of Geotechnical Engineer of Record.

2. The recommendations of this report pertain only to the site investigated and are based upon the assumption that the soil conditions do not deviate from those disclosed in the investigation. If any variations or undesirable conditions are encountered during construction, or if the proposed construction will differ from that anticipated herein, Geocon Incorporated should be notified so that supplemental recommendations can be given. The evaluation or identification of the potential presence of hazardous or corrosive materials was not part of the scope of services provided by Geocon Incorporated.

3. This report is issued with the understanding that it is the responsibility of the owner or his representative to ensure that the information and recommendations contained herein are brought to the attention of the architect and engineer for the project and incorporated into the plans, and the necessary steps are taken to see that the contractor and subcontractors carry out such recommendations in the field.

4. The findings of this report are valid as of the present date. However, changes in the conditions of a property can occur with the passage of time, whether they be due to natural processes or the works of man on this or adjacent properties. In addition, changes in applicable or appropriate standards may occur, whether they result from legislation or the broadening of knowledge. Accordingly, the findings of this report may be invalidated wholly or partially by changes outside our control. Therefore,this report is subject to review and should not be relied upon after a period of three years.

Geocon Project No.G2689-22-01 September 3,2021 03/08/2022 C7 135 of 159

SMILAX-MIMOSA SEWER IMPROVEMENTS

SAN DIEGO COUNTY, CALIFORNIA
450 450
c p�'a aac' w ap<
faS ti86
mx� +
«s
B-3 -
440 <S a0 440 one a N B 2N
w� �u
< p ■-\\
430 �30
7 J
w
.. f-3 '� 5=0.55% -. 11 5-0.55% —
0' 50' 100' 150' 200'
I #+
420 ,' 7 420 IN4USHION RrrcT}!� �� HORIZONTAL SCALE 1`100' Kt _ -
10+0 11+00 12+00 13+00 14+00 15+00 16+00 17+00 18+00 19+00 20+00 21+00 Nk22+00 Pros-Ex. GAS
-- PH 9 IX. 8"VCP SEWER

1.0%SLOPE PER
B-5 owls BU-9-6A
Qaf/* :. --:f O
EX. 3 GAS \r
\ PH 7—BOT IX.8'x 5'BOX CULVERT W———W— T
°\ REPLACE EX. STRIPING —W -- PH 10—IX. TER \ B-4 __ __W--
w EX. 8"ACP WA R
\
�\ �EX. 3"GAS h --W E�--
N — W—
F` —W
B-3
�/_�1� f — �; —W——
�EX. 24' x 5' BOX tri4y�e.�f/•! •t��i '�' \ F �—f —W— E� EX. 3"GAS X. 8"ACP WATER / ��++CC��^^ °\\ pH 6—EX. 0ASJ —W EX. 8 X 5' BOX CULVERT Z-1
, Qaf/� .. .-W— PH 5-IX.B"WIED FO LINEEX. 8"ACP WATERa4,-IX. WATER IX"24' x 5' BOX CULVERT WATERS \��

GEOCON LEGEND
Qaf........ARTIFICIAL FILL
TSa........SANTIAGO FORMATION((Dotted Where Buried) �f�f`�f� Kt........TONALITE(GRANITIC ROCK)(Dotted Where Buried) I+j t OCON ���

INCORPORATED
........APPROX.LOCATION OF GEOLOGIC CONTACT GEOTECHNICAL ■ ENVIRONMENTAL ■ MATERIALS (Dotted Where Buried) 6960 FLANDERS DRIVE-SAN DIEGO,CALIFORNIA 92121-2974 PHONE 858 558-6900-FAX 858 558-6159
B 5�........APPROX.LOCATION OF BORING PROJECT NO. G2689-22-01 FIGURE 1
........APPROX.DEPTH TO FORMATION(In Feet) SITE PLAN/GEOLOGIC MAP DATE 09-03 -2021 Plotted:09/07/2021 4:57PM I By:ALVIN LADRILLONO I File Location:Y:\PROJECTS\G2689-22-01(Smilax-Mimosa Sewer Improvements)\SHEETS\G2689-22-01 Geo Map.dwg 03/08/2022 C7 136 of 159

APPENDIX A
�
03/08/2022 C7 137 of 159

APPENDIX A

FIELD INVESTIGATION
We performed our field exploration on August 5 and 6, 2021, which consisted of a site reconnaissance, and drilling 5 exploratory borings. The Site Plan/Geologic Map, Figure 1, shows the approximate locations of the exploratory borings. The boring logs are presented in this Appendix. We located the borings in the field using a measuring tape and existing reference points; therefore, actual boring locations may deviate slightly. The geotechnical borings were drilled to a depth of approximately 19%2 feet below existing grade using an Ingersoll Rand(IR)A-300, track-mounted drill rig equipped with 8-inch-diameter hollow-stem augers.

We obtained samples during our subsurface exploration using either a California sampler or a Standard Penetration Test (SPT) sampler. Both samplers are composed of steel and are driven to obtain relatively undisturbed soil samples. The California sampler has an inside diameter of 2.5 inches and an outside diameter of 2.875 inches. Up to 18 rings are placed inside the sampler that is 2.4 inches in diameter and 1 inch in height. The SPT sampler has an inside diameter of 1.5 inches and an outside diameter of 2 inches. We obtained ring samples at appropriate intervals,placed them in moisture-tight containers, and transported them to the laboratory for testing. The type of sample is noted on the exploratory boring logs.

The samplers were driven 12 inches and 18 inches for Modified California sampler and SPT sampler, respectively. The sampler is connected to A rods and driven into the bottom of the excavation using a 140-pound hammer with a 30-inch drop. Blow counts are recorded for every 6 inches the sampler is driven. The penetration resistances shown on the boring logs are shown in terms of blows per foot. The values indicated on the boring logs are the sum of the last 12 inches of the sampler. If the sampler was not driven for 12 inches, an approximate value is calculated in term of blows per foot or the final 6-inch interval is reported. These values are not to be taken as N-values as adjustments have not been applied.

We estimated elevations shown on the boring logs either from a topographic map or by using a benchmark.

We visually examined, classified, and logged the soil encountered in the borings in general accordance with American Society for Testing and Materials (ASTM) practice for Description and Identification of Soils (Visual-Manual Procedure D 2488). The logs depict the soil and geologic conditions observed and the depth at which samples were obtained.

Geocon Project No.G2869-22-01 September 3,2021 03/08/2022 C7 138 of 159

PROJECT NO. G2689-22-01
r w BORING B 1 Z LU
DEPTH O Q SOIL O Z LL Z L Of SAMPLE O :

N Uj
NO LU
p Z CLASS ELEV. (MSL.) 434' DATE COMPLETED 08-05-2021 U)� o U `O FEET J 70 (USCS) Z LU OJ }a O Z EQUIPMENT IRA-300 BY:M.ERTWINE a m Op

MATERIAL DESCRIPTION
0 5"ASPHALT CONCRETE
B1-1 SC ARTIFICIAL FILL(Qaf)
X.

Medium dense,moist,dark brown,Clayey,fine to coarse SAND 271 --- -------gC ------------------------ ——— ———
CL Stiff,moist,grayish brown,SiltyCLAY
4 ——— -------------- ----------------- --- ——— ——— B1-2 SC Dense,moist,dark brown, Clayey,fine to coarse SAND 29 115.7 13.5 6 8 /l
-Gravel layer
10 ��.
131-3 -Abundant gravel in sandy clay matrix 34 f.-
12 :
�f
14 f-
B1-4 + + GRANITIC ROCK(Kt) 50 112.5 14.9 + Dense,damp,yellowish brown,Clayey,fine to coarse SAND;decomposed 16 + + GRANITIC ROCK(Saprolite)
+
+ +
+
18 —y ——— ---
B1-5 + + Highly weathered,moderately strong,yellowish brown GRANITIC ROCK; 97/99" ++ excavates with heavy effort
+
BORING TERMINATED AT 19.5 FEET
Groundwater not encountered
Figure A-1, G2689-22-01.GPJ
Log of Boring B 1, Page 1 of 1
❑...SAMPLE SYMBOLS SAMPLING UNSUCCESSFUL ...STANDARD PENETRATION TEST ...DRIVE SAMPLE(UNDISTURBED) ®...DISTURBED OR BAG SAMPLE Q ...CHUNK SAMPLE 1 ...WATER TABLE OR Q...SEEPAGE NOTE: THE LOG OF SUBSURFACE CONDITIONS SHOWN HEREON APPLIES ONLY AT THE SPECIFIC BORING OR TRENCH LOCATION AND AT THE DATE INDICATED. IT IS NOT WARRANTED TO BE REPRESENTATIVE OF SUBSURFACE CONDITIONS AT OTHER LOCATIONS AND TIMES.

GEOCON
03/08/2022 C7 139 of 159

PROJECT NO. G2689-22-01
r w BORING B 2 Z LU
DEPTH O Q SOIL O Z LL Z L Of SAMPLE O :

N Uj
NO LU
p Z CLASS ELEV. (MSL.) 437' DATE COMPLETED 08-05-2021 U)� o U `O FEET J 70 (USCS) Z LU OJ }a O Z 0 EQUIPMENT IRA-300 BY:M.ERTWINE a m Op

MATERIAL DESCRIPTION
0 6"ASPHALT CONCRETE
. :t. SM-SC ARTIFICIAL FILL(Qaf)
o 44 II_ Medium dense,moist,grayish brown,Silty,fine coarse SAND;some clay and 2 l`` trace gravel
4 - - -- ——— ————————————————————————————————— ——— ——— --- B2-1 CL Very stiff,moist,brown,Silty CLAY;trace gravel 37 6 8
10 �
B_-2 -Few gravel and cobble in Sandy CLAY matrix,sampling unsuccessful 48 12 -Gravel lense
14 ——— ——— ——— ——— ---
B2-3 Very dense,damp,brown,Silty SAND;abundant gravel,poor recovery 50/5.5" 16 18
132-4 ML SANTIAGO FORMATION(Tsa) 30 93.1 27.3 Very stiff,moist,light gray mottled reddish brown,Clayey SILTSTONE BORING TERMINATED AT 19.5 FEET
Groundwater not encountered
Figure A-2, G2689-22-01.GPJ
Log of Boring B 2, Page 1 of 1
❑...SAMPLE SYMBOLS SAMPLING UNSUCCESSFUL ...STANDARD PENETRATION TEST ...DRIVE SAMPLE(UNDISTURBED) ®...DISTURBED OR BAG SAMPLE Q ...CHUNK SAMPLE 1 ...WATER TABLE OR Q...SEEPAGE NOTE: THE LOG OF SUBSURFACE CONDITIONS SHOWN HEREON APPLIES ONLY AT THE SPECIFIC BORING OR TRENCH LOCATION AND AT THE DATE INDICATED. IT IS NOT WARRANTED TO BE REPRESENTATIVE OF SUBSURFACE CONDITIONS AT OTHER LOCATIONS AND TIMES.

GEOCON
03/08/2022 C7 140 of 159

PROJECT NO. G2689-22-01
r w BORING B 3 Z LU LLJ 8-1
DEPTH O Q SOIL O Z LL Z L Of SAMPLE O :

N Uj
NO LU
p Z CLASS ELEV. (MSL.) 441' DATE COMPLETED 08-05-2021 U)� o U `O FEET J 70 (USCS) Z LU }a O Z EQUIPMENT IRA-300 BY:M.ERTWINE a m Op

MATERIAL DESCRIPTION
0 5"ASPHALT CONCRETE
SC ARTIFICIAL FILL(Qaf)
Medium dense,moist,grayish brown,Clayey,fine to coarse SAND;trace 2 f gravel
B3-1 CL Stiff,moist,grayish brown,Silty CLAY
4 --- ---
-- —---- ————— ————— ------ ——— ——— ——— B3-2 CL Verystiff,yellowish to grayish brown,Sandy CLAY;some gravel 19 6 8
10 ——— --------------- ----------------- --- ——— ———B3-3 I SM Medium dense,moist,brown,Silty,fine to coarse SAND 20 114.2 8.1 12 j--F:1.
14 B3-4 _ ML SANTIAGO FORMATION(Tsa) 59 16 Hard,moist,light gray,Sandy SILTSTONE
18 133-5 88/9"
lt
BORING TERMINATED AT 19.3 FEET
Groundwater not encountered
Figure A-3, G2689-22-01.GPJ
Log of Boring B 3, Page 1 of 1
❑...SAMPLE SYMBOLS SAMPLING UNSUCCESSFUL ...STANDARD PENETRATION TEST ...DRIVE SAMPLE(UNDISTURBED) ®...DISTURBED OR BAG SAMPLE Q ...CHUNK SAMPLE 1 ...WATER TABLE OR Q...SEEPAGE NOTE: THE LOG OF SUBSURFACE CONDITIONS SHOWN HEREON APPLIES ONLY AT THE SPECIFIC BORING OR TRENCH LOCATION AND AT THE DATE INDICATED. IT IS NOT WARRANTED TO BE REPRESENTATIVE OF SUBSURFACE CONDITIONS AT OTHER LOCATIONS AND TIMES.

GEOCON
03/08/2022 C7 141 of 159

PROJECT NO. G2689-22-01
r w BORING B 4 Z LU LLJ 8-1
DEPTH O Q SOIL O Z LL Z L Of SAMPLE O :

N Uj
NO LU
p Z CLASS ELEV. (MSL.) 442' DATE COMPLETED 08-05-2021 U)� o U `O FEET J 70 (USCS) Z LU }a O Z EQUIPMENT IRA-300 BY:M.ERTWINE a m Op

MATERIAL DESCRIPTION
0 5"ASPHALT CONCRETE
. r:t. SM ARTIFICIAL FILL(Qaf)
o
44 I I Medium dense,moist,dark brown,Silty,fine coarse SAND :1``-
2 4
1 J ——— ——— ---
B4-1 CL Stiff,moist,dark brown,Sandy CLAY 14 6 8
10 ——— --- --------— —————————————————— --- ——— ——— B4-2 CH Verystiff,moist,brown to grayish brown,fat CLAY 28 109.6 19.6 12 14
B4-3 _ ML SANTIAGO FORMATION(Tsa) 41 16 Hard,moist,gray,Sandy SILTSTONE
18 --- -------- ---ty------------------- --- --- --- B4-4 <k< SM Dense,moist,light brown,Silty,fine to coarse SANDSTONE 47 BORING TERMINATED AT 19.5 FEET
Groundwater not encountered
Figure A-4, G2689-22-01.GPJ
Log of Boring B 4, Page 1 of 1
❑...SAMPLE SYMBOLS SAMPLING UNSUCCESSFUL ...STANDARD PENETRATION TEST ...DRIVE SAMPLE(UNDISTURBED) ®...DISTURBED OR BAG SAMPLE Q ...CHUNK SAMPLE 1 ...WATER TABLE OR Q...SEEPAGE NOTE: THE LOG OF SUBSURFACE CONDITIONS SHOWN HEREON APPLIES ONLY AT THE SPECIFIC BORING OR TRENCH LOCATION AND AT THE DATE INDICATED. IT IS NOT WARRANTED TO BE REPRESENTATIVE OF SUBSURFACE CONDITIONS AT OTHER LOCATIONS AND TIMES.

GEOCON
03/08/2022 C7 142 of 159

PROJECT NO. G2689-22-01
r w BORING B 5 Z LU
DEPTH O Q SOIL O Z LL Z L Of SAMPLE O :

N Uj
NO LU
p Z CLASS ELEV. (MSL.) 444' DATE COMPLETED 08-06-2021 U)� o U `O FEET J 70 (USCS) Z LU OJ }a O Z EQUIPMENT IRA-300 BY:M.ERTWINE a m Op

MATERIAL DESCRIPTION
0 6"ASPHALT CONCRETE
——— ————— -----——— ---
{- r SM ARTIFICIAL FILL(Qaf)
4 I Medium dense,moist,dark gayish brown,Silty,fine coarse SAND 2 --- ————————————————————————————————---——— ——— --- CL Stiff,moist,brown,Silty CLAY
4 ——— ————————————————————————————————— ——— ——— --- B5-2 CH Very stiff,moist,dark brown,mottled grayish brown,fat CLAY 43 119.6 14.3 6 8
10 — --- —————————————— —————————————————---——— ——— --- B5-3 CH Stiff,moist,brown mottled grayish brown,fat CLAY 15 12 14
B5-4 r° SC SANTIAGO FORMATION(Tsa) 54 104.7 19.8 16 ° . . Dense,moist,gray to grayish brown,Clayey SANDSTONE 18 B5-5 f °°° -Trace gravel clasts;weathered saprolitic 5015 BORING TERMINATED AT 19.5 FEET
Groundwater not encountered
Figure A-5, G2689-22-01.GPJ
Log of Boring B 5, Page 1 of 1
❑...SAMPLE SYMBOLS SAMPLING UNSUCCESSFUL ...STANDARD PENETRATION TEST ...DRIVE SAMPLE(UNDISTURBED) ®...DISTURBED OR BAG SAMPLE Q ...CHUNK SAMPLE 1 ...WATER TABLE OR Q...SEEPAGE NOTE: THE LOG OF SUBSURFACE CONDITIONS SHOWN HEREON APPLIES ONLY AT THE SPECIFIC BORING OR TRENCH LOCATION AND AT THE DATE INDICATED. IT IS NOT WARRANTED TO BE REPRESENTATIVE OF SUBSURFACE CONDITIONS AT OTHER LOCATIONS AND TIMES.

GEOCON
03/08/2022 C7 143 of 159

APPENDIX 4 0
03/08/2022 C7 144 of 159

APPENDIX B

LABORATORY TESTING
We performed laboratory tests in accordance with generally accepted test methods of the American Society for Testing and Materials (ASTM) or other suggested procedures. Selected soil samples were tested for in-place dry density and moisture content, maximum density and optimum moisture content, direct shear strength, plasticity index, gradation, sand equivalent, corrosion potential, and R-Value characteristics. The results of our laboratory tests are presented herein. The in-place dry density and moisture content of the samples tested are presented on the boring logs in Appendix A.

SUMMARY OF LABORATORY MAXIMUM DRY DENSITY

AND OPTIMUM MOISTURE CONTENT TEST RESULTS
ASTM D 1557
0 Maximum Optimum
Sample No. 1 i • 1ry Density Moisture Content B3-1 Grayish brown,Clayey,fine to coarse SAND 138.8 6.3

SUMMARY OF LABORATORY WATER-SOLUBLE SULFATE TEST RESULTS CALIFORNIA TEST NO. 417
�. i o• Water-Soluble
Exposure
B3-1 1 to 5 1 Qaf 0.016 SO

SUMMARY OF LABORATORY CHLORIDE TEST RESULTS
AASHTO T 291
Sample No. Depth(Feet) Geologic Unit Chloride Ion Chloride Ion B3-1 1 to 5 Qaf 81 0.008

SUMMARY OF LABORATORY POTENTIAL OF HYDROGEN (PH)

AND RESISTIVITY TEST RESULTS
CALIFORNIA TEST NO. 643
Minimum
Sample i I i i
(ohm-centimeters)
B3-1 1 to 5 Qaf 8.4 2,000
Geocon Project No.G2689-22-01 B- I - September 3,2021 03/08/2022 C7 145 of 159

SUMMARY OF LABORATORY DIRECT SHEAR TEST RESULTS
ASTM D 3080
Dry Moisture Content Peak Peak [Ultimate'l Samp 1 i 1 of- Angle
No.

Unit (pcf) Initial Final Cohesion
oil
i
i
131-2 5 Qaf 115.7 13.5 18.1 1790[1550] 16 [18] 132-4 18.5 Tsa 93.1 27.3 32.4 910 [600] 29 [28] 133-3 10 Qaf 114.2 8.1 16.0 380 [380] 35 [35] 134-2 10 Qaf 109.2 19.6 21.9 450 [270] 30 [31] 135-2 5 Qaf 119.6 14.3 17.8 1200 [920] 18 [20] Ultimate at end of test at 0.25 inch deflection.

SUMMARY OF LABORATORY SAND EQUIVALENT TEST RESULTS
ASTM D 2419
Sample No. 1 Geologic i
131-1 1 to 5 Qaf 21

SUMMARY OF LABORATORY PLASTICITY INDEX TEST RESULTS
ASTM D 4318
No. 1 Geologic
131-1 1 to 5 Qaf 33 21 12
133-1 1 to 5 Qaf 32 19 13
135-1 1 to 5 Qaf 33 16 17
NP=Non-Plastic

SUMMARY OF LABORATORY RESISTANCE VALUE (R-VALUE)TEST RESULTS ASTM D 2844
Sample No. Approx. Sample 1 (Geologic Depth
135-1 1 to 5 Qaf 16
Geocon Project No.G2689-22-01 B-2- September 3,2021 03/08/2022 C7 146 of 159

SAMPLE NO.: B I-2 GEOLOGIC UNIT: Qaf
SAMPLE DEPTH (FT): 5 NATURAUREMOLDED: N
ACTUAL NORMAL STRESS (PSF): 1000 3000 5000 --
WATER CONTENT (%): 12.5 16.1 12.0 13.5
DRY DENSITY(PCF): 122.5 108.6 115.9 115.7
WATER CONTENT (%): 16.5 21.7 16.0 18.1
PEAK SHEAR STRESS (PSF): 2243 2360 3419 --
ULT.-E.O.T. SHEAR STRESS (PSF): 1980 2353 3309 --

RESULTS
COHESION, C (PSF) 1790
PEAK FRICTION ANGLE (DEGREES) 16
ULTIMATE COHESION, C (PSF) 1550
FRICTION ANGLE (DEGREES) 18
4000
7000
5 K PEAK
3500
........................ ULTIMATE
6000
3000
2500 3 K u-
s000
CA
Ln
kn Ln
oc 2000 w 4000
Ln
Q 1500
= I K ,a
3000
fA x
N
1000
2000
500
0 1000
0 0.05 0.1 0.15 0.2 0.25 0.3 HORIZONTAL DEFORMATION (IN) 0
1K 3 K 5 K 0 1000 2000 3000 4000 5000 6000 1 K PEAK A 3 K PEAK A 5 K PEAK
X 1 K ULTIMATE X 3 K ULTIMATE X 5 K ULTIMATE NORMAL STRESS(PSF) GE O C{ON OF)INCORPORATED

SMILAX-MIMOSA

GEOTECHNICAL CONSULTANTS
6960 FLANDERS DRIVE SAN DIEGO, CALIFORNIA 92121-2974
PHONE 858 558-6900 FAX 858 558-6159 PROJECT NO.: G2689-22-01 03/08/2022 C7 147 of 159

SAMPLE NO.: 1132-4 GEOLOGIC UNIT: Tsa
SAMPLE DEPTH (FT): 18.5 NATURAUREMOLDED: N =v mz !
ACTUAL NORMAL STRESS (PSF): 1000 3000 5000 --
WATER CONTENT (%): 27.4 26.7 27.8 27.3
DRY DENSITY(PCF): 94.0 90.0 95.2 93.1
=hETEl? TES COUDITI! US
rl
WATER CONTENT (%): 32. 34.0 31.1 32.4
PEAK SHEAR STRESS (PSF): 1642243 3871 --
ULT.-E.O.T. SHEAR STRESS (PSF): 1 125 2243 3270 --

RESULTS
COHESION, C (PSF) 910
PEAK FRICTION ANGLE (DEGREES) 29
ULTIMATE COHESION, C (PSF) 600
FRICTION ANGLE (DEGREES) 28
7000
PEAK
........................ ULTIMATE
6000
3999
3 K 5000
LL
a �n
Ln
fA Ln
owc w 4000
Ln
I= Ln
Q
w Q
N = 3000
innn
2000
-0 5 599 0.05 0.1 0.15 0.2 0.25 0 3 1000
HORIZONTAL DEFORMATION (IN) 0
1 K 3 K 5 K 0 1000 2000 3000 4000 5000 6000 1 K PEAK A 3 K PEAK A 5 K PEAK
X 1 K ULTIMATE X 3 K ULTIMATE X 5 K ULTIMATE NORMAL STRESS(PSF) GEOC{ON OF)INCORPORATED

SMILAX-MIMOSA

GEOTECHNICAL CONSULTANTS
6960 FLANDERS DRIVE SAN DIEGO, CALIFORNIA 92121-2974
PHONE 858 558-6900 FAX 858 558-6159 PROJECT NO.: G2689-22-01 03/08/2022 C7 148 of 159

SAMPLE NO.: 1133-3 GEOLOGIC UNIT: Qaf
SAMPLE DEPTH (FT): 10 NATURAUREMOLDED: N ACTUAL NORMAL STRESS (PSF): 890 3170 --
WATER CONTENT(%): 9.4 5.9 9.0 8.1
DRY DENSITY(PCF): 121.7 109.6 1 1 1.4 114.2
CTEII? TES C�Tlous
WATER CONTENT (%): 13.6 16.7 17.6 16.0
PEAK SHEAR STRESS (PSF): 962 2687 4157 --
ULT.-E.O.T. SHEAR STRESS (PSF): 962 2687 4157 - COHESION, C (PSF) 380
PEAK FRICTION ANGLE (DEGREES) 35
ULTIMATE 7
COHESION, C (PSF) 380
FRICTION ANGLE (DEGREES) 35
4500
7000
4000 4 K
6000
3500 ------- PEAK

ULTIMATE
LL 3000 5000
CA LL
2K a
Ln 2500
kn
o"'c w 4000
v~i 2000 H
� N
Q �
N 1500 w 3000
x
N
1000 lK
2000
500
0 1000

0.000 0.050 0.100 0.150 0.200 0.250 0.300 HORIZONTAL DEFORMATION (IN) 0
1K 3K 5K 0 1000 2000 3000 4000 5000 6000 A 1 K PEAK A 3 K PEAK A 5 K PEAK
X 1 K ULTIMATE X 3 K ULTIMATE X 5 K ULTIMATE NORMAL STRESS(PSF)

IGE O CON

INCORPORATED

SMILAX-MIMOZA

GEOTECHNICAL CONSULTANTS
6960 FLANDERS DRIVE SAN DIEGO, CALIFORNIA 92121-2974
PHONE 858 558-6900 FAX 858 558-6159 PROJECT NO.: G2689-22-01 03/08/2022 C7 149 of 159

SAMPLE NO.: 1134-2 GEOLOGIC UNIT: Qaf
SAMPLE DEPTH (FT): 10 NATURAUREMOLDED: N ACTUAL NORMAL STRESS (PSF): 1000 3000 5000 --
WATER CONTENT (%): 19.2 21.1 18.6 19.6
DRY DENSITY(PCF): 110.1 107.3 110.2 109.2
- - •
WATER CONTENT (%): 21.5 23.7 20.5 21.9
PEAK SHEAR STRESS (PSF): 897 2402 3163 --
ULT.-E.O.T. SHEAR STRESS (PSF): 699 2409 3091 -- WWI
COHESION, C (PSF) 450
PEAK FRICTION ANGLE (DEGREES) 30
ULTIMATE 7
COHESION, C (PSF) 270
FRICTION ANGLE (DEGREES) 31
3500
7000
K PEAK
3000 ........................ ULTIMATE
6000
2500
3 K 5000
u-
Ln 2000
o"'c w 4000
Ln
1500 Ln
Q �
= I K w 3000
v� x
1000
2000 '
500
0 1000
0 0.05 0.1 0.15 0.2 0.25 0.3 ' HORIZONTAL DEFORMATION (IN) 0
1K 3 K 5 K 0 1000 2000 3000 4000 5000 6000 1 K PEAK A 3 K PEAK A 5 K PEAK
X 1 K ULTIMATE X 3 K ULTIMATE X 5 K ULTIMATE NORMAL STRESS(PSF) 0 GE O C{ON OF)INCORPORATED

SMILAX-MIMOSA

GEOTECHNICAL CONSULTANTS
6960 FLANDERS DRIVE SAN DIEGO, CALIFORNIA 92121-2974
PHONE 858 558-6900 FAX 858 558-6159 PROJECT NO.: G2689-22-01 03/08/2022 C7 150 of 159

SAMPLE NO.: BS-2 GEOLOGIC UNIT: Qaf
SAMPLE DEPTH (FT): S' NATURAUREMOLDED: N
7 ACTUAL NORMAL STRESS (PSF): 1000 3000 5000 --
WATER CONTENT (%): 14.1 14.9 14. 114 33
DRY DENSITY(PCF): 122.3 118.3 118.1 1 19.6
• . 71954
WATER CONTENT (%): 16.79.3 17.3 17.8
PEAK SHEAR STRESS (PSF): 1882 2808 --
ULT.-E.O.T. SHEAR STRESS (PSF): 133354 2808 --

RESULTS
COHESION, C (PSF) 1200
PEAK FRICTION ANGLE (DEGREES) 18
ULTIMATE COHESION, C (PSF) 920
FRICTION ANGLE (DEGREES) 20
3000
7000
PEAK
2500 - - ULTIMATE
5 K 6000
2000
�i 5000
LL
Ln 1500
owfA
c w 4000
Ln
1000 Ln
Q
w Q
N = 3000
500
3K
2000
0 0.05 0.1 0.15 0.2 0.25 03
-500 1000
HORIZONTAL DEFORMATION (IN) 0
1 K 3 K 5 K 0 1000 2000 3000 4000 5000 6000 1 K PEAK A 3 K PEAK A 5 K PEAK
X 1 K ULTIMATE X 3 K ULTIMATE X 5 K ULTIMATE NORMAL STRESS(PSF) GEOC{ON OF)INCORPORATED

SMILAX- MIMOSA SEWER

GEOTECHNICAL CONSULTANTS
6960 FLANDERS DRIVE SAN DIEGO, CALIFORNIA 92121-2974
PHONE 858 558-6900 FAX 858 558-6159 PROJECT NO.: G2689-22-01 mmmi
03/08/2022 C7 151 of 159

TEST RESULTS

SAMPLE GEOLOGIC LIQUID

SOIL TYPE
•
. UNIT LIMIT LIMIT INDEX
BI-I Qaf 33 21 12 CL
80 LOW PLASTICITY F 4 HIGH PLASTICITY
70 P�?�
60 CL CH
X
50 •61-1
Z ■
t: 40
U
p
J 30
a
20 MH-OH
10 CL-M
0 ML I ML-OL
0 10 20 30 40 50 60 70 80 90 100 110 120

LIQUID LIMIT

DESCRIPTIONSOIL TYPE
CH High-Plasticity Clay
CL Low-Plasticity Clay
ML Low-Plasticity Silt
CL-ML Low-Plasticity Clay to Low-Plasticity Silt MH-OH High-Plasticity Silt to High-Plasticity, Organic Silt ML-OL Low-Plasticity Silt to Low-Plasticity, Organic Silt GEO{CON

I N C O R P O R A T E D
SMILAX

GEOTECHNICAL CONSULTANTS
6960 FLANDERS DRIVE - SAN DIEGO, CALIFORNIA 92121-2974 PROJECT NO.: G2689-22-01 PHONE 858 558-6900 - FAX 858 558-6159
03/08/2022 C7 152 of 159

TEST RESULTS

SAMPLE GEOLOGIC LIQUID

SOIL TYPE
•
. UNIT LIMIT LIMIT INDEX
133-1 Qaf 32 19 13 CL
80 LOW PLASTICITY F 4 HIGH PLASTICITY
70 P�?�
60 CL CH
X
50 •63-1
Z ■
t: 40
U
p
J 30
a
20 • MH-OH
10 CL-M
0 ML I ML-OL
0 10 20 30 40 50 60 70 80 90 100 110 120

LIQUID LIMIT

DESCRIPTIONSOIL TYPE
CH High-Plasticity Clay
CL Low-Plasticity Clay
ML Low-Plasticity Silt
CL-ML Low-Plasticity Clay to Low-Plasticity Silt MH-OH High-Plasticity Silt to High-Plasticity, Organic Silt ML-OL Low-Plasticity Silt to Low-Plasticity, Organic Silt GEO{CON

I N C O R P O R A T E D
SMILAX

GEOTECHNICAL CONSULTANTS
6960 FLANDERS DRIVE - SAN DIEGO, CALIFORNIA 92121-2974 PROJECT NO.: G2689-22-01 PHONE 858 558-6900 - FAX 858 558-6159
03/08/2022 C7 153 of 159

TEST RESULTS

SAMPLE GEOLOGIC LIQUID

SOIL TYPE
•
. UNIT LIMIT LIMIT INDEX
135-1 Qaf 33 16 17 CL
80 LOW PLASTICITY F 4 HIGH PLASTICITY
70 P�?�
60 CL CH
X
50 •65-1
Z ■
t: 40
U
p
J 30
a
20 MH-OH
10 CL-M
0 ML I ML-OL
0 10 20 30 40 50 60 70 80 90 100 110 120

LIQUID LIMIT

DESCRIPTIONSOIL TYPE
CH High-Plasticity Clay
CL Low-Plasticity Clay
ML Low-Plasticity Silt
CL-ML Low-Plasticity Clay to Low-Plasticity Silt MH-OH High-Plasticity Silt to High-Plasticity, Organic Silt ML-OL Low-Plasticity Silt to Low-Plasticity, Organic Silt GEO{CON

I N C O R P O R A T E D
SMILAX

GEOTECHNICAL CONSULTANTS
6960 FLANDERS DRIVE - SAN DIEGO, CALIFORNIA 92121-2974 PROJECT NO.: G2689-22-01 PHONE 858 558-6900 - FAX 858 558-6159
03/08/2022 C7 154 of 159

�lii�:l�■ III
III■�■IIII■�IIII��■IIIY�■■II�II�

ui�4■ III
III■�■IIII■�IIII�\■IIIY�■■II�II�
III■�■IIII■■IIIA�■IIII■ru°III
III■1■IIA■'�IIIII�■■IIII■■II�II�

Ilii'±� III
III■�■IIII■�11111�1■IIIY�■■II�II�
IIIIIC����:�����: !�I.fl�l III■
IpIIn■�■IIIIII■�IIIAu�■■IIIM�■II�II�
III■�■IIII■■IIIA�■IIIII�■■Ilpll�
III■1■IIA■'�IIIII�■■IIIII�■■II�III�

LIST OF REFERENCES

1. 2019 California Building Code, California Code of Regulations, Title 24, Part 2, based on the 2018 International Building Code, prepared by California Building Standards Commission, dated July 2019.

2. California Department of Conservation,Division of Mines and Geology,Probabilistic Seismic Hazard Assessment for the State of California, Open File Report 96-08, 1996.

3. California Geological Survey, Seismic Shaking Hazards in California, Based on the USGS/CGS Probabilistic Seismic Hazards Assessment (PSHA) Model, 2002 (revised April 2003). 10%probability of being exceeded in 50 years.
http://redirect.conservation.ca.gov/c LIr hm/pshama / shamain.html

4. County of San Diego, San Diego County Multi Jurisdiction Hazard Mitigation Plan, San Diego, California—Final Draft, dated 2017

5. Historical Aerial Photos. http://www.historicaerials.com

6. Jennings, C. W., 1994, California Division of Mines and Geology, Fault Activity Map of California and Adjacent Areas, California Geologic Data Map Series Map No. 6.

7. Kennedy, M. P., and S. S. Tan, 2007, Geologic Map of the Oceanside 30'x60' Quadrangle, California,USGS Regional Map Series Map No. 3, Scale 1:100,000.

8. Unpublished reports, aerial photographs, and maps on file with Geocon Incorporated.

9. USGS computer program, Seismic Hazard Curves and Uniform Hazard Response Spectra, http://geohazards.usgs.gov/designmaps/us/application.php .

Geocon Project No.G2689-22-01 September 3,2021 03/08/2022 C7 158 of 159

74 RiversideProject San M)rcos
'San Clements
Al
Oceanside Escondido W� OF
Floi 5I f
Site
T '*; �x
xx
San
Diego
Santee
E Cajon
La e—
805 ea Chula Vista
` • W
Mexico .14
AN
- x; - Propns -
Pa)
Jill '191
,.
r � .
r r
Miche$I Ik9r _