ACTION:
____________________________
Clerk/Secretary
Department: Engineering Item No: C13
Prepared by:
Matt Atteberry, Principal Engineer
Erin Adams, Management Analyst Meeting Date: June 14, 2022 Approved by:
Greg Mayer, City Engineer
Patrick Johnson, City Manager Agenda Location: Consent Calendar SUBJECT: FISCAL YEAR 2022/23 SB 1 ROAD REPAIR AND ACCOUNTABILITY ACT PROJECT LIST RECOMMENDATION: Adopt City Council Resolution No. 2022- , adopting the Fiscal Year 2022/23 SB 1 Road Repair and Accountability Act Project List.
CORRELATION TO CITY COUNCIL GOALS: (1) Fiscal Responsibility, and (2) Traffic: Continue to improve the flow of traffic for all forms of travel, reduce congestion, and improve our roads and sidewalks.
PRIOR ACTION: On June 22, 2021, adopted City Council Resolution No. 2021-102, adopting the Fiscal Year 2021/22 SB 1 Road Repair and Accountability Act Project List (Vote: 5-0).
On April 14, 2020, adopted City Council Resolution No. 2020-49, adopting the Fiscal Year 2020/21 SB 1 Road Repair and Accountability Act Project List (Vote: 5-0).
On April 9, 2019, adopted City Council Resolution No. 2019-41, adopting the Fiscal Year 2019/20 SB 1 Road Repair and Accountability Act Project List (Vote: 5-0).
STATEMENT ON THE SUBJECT: In 2017, Senate Bill (SB) 1, the Road Repair and Accountability Act of 2017, was signed into law. SB 1 increased per gallon gasoline and diesel fuel excise taxes, increased diesel fuel sales tax, vehicle registration fees, and provides for inflationary adjustments to tax rates in future years to address basic road maintenance rehabilitation and critical safety needs on both the state highway and local streets and road system.
A percentage of the Road Maintenance and Rehabilitation Account (RMRA) funding is apportioned to eligible cities and counties by the formula listed in the California Streets and Highways Code (SHC) Section 2032(h) for basic road maintenance, rehabilitation, and critical safety projects.
To be eligible for SB 1 RMRA funding, cities and counties are required to develop and submit a list of local street and road projects to the California Transportation Commission each fiscal year. This list must be submitted by an agency before it can receive an apportionment of funds from the State Controller. RMRA funds made available for the Local Streets and Roads Funding Program are prioritized for expenditures on basic road maintenance and rehabilitation projects, and on critical safety projects.
SHC Section 2030(b)(1) provides several examples of the types of uses for RMRA funding, which include, but are not limited to:
AGENDA
REPORT
CITY COUNCIL
COMMUNITY DEVELOPMENT COMMISSION
SUCCESSOR AGENCY
BUENA SANITATION DISTRICT
JOINT POWERS FINANCING AUTHORITY
06/14/2022 C13 Page 1 of 8
Approved above recommendation, adopted City Council Resolution No. 2022-88.
Vote: 5-0
MEETING DATE: June 14, 2022 PAGE 2
SUBJECT: FISCAL YEAR 2022/23 SB 1 ROAD REPAIR AND ACCOUNTABILITY ACT PROJECT LIST •Road Maintenance and Rehabilitation
•Safety Improvements
•Railroad Grade Separations
•Complete Streets Components (including active transportation purposes, pedestrian and bicycle safety projects, transit facilities, and drainage and stormwater capture projects in conjunction with other allowable projects)
•Traffic Control Devices
The project list, attached as Exhibit 2, must include a description and the location of each proposed project, a proposed schedule for each project’s completion, and the estimated useful life of the improvement. The City’s Five-Year Capital Improvement Project (CIP) budget includes several projects that meet the criteria established in SB 1. Past City Council direction has been to use the SB 1 funds for residential street rehabilitation to improve public residential streets throughout Vista. For Fiscal Year 2022/23, staff recommends submitting CIP No. 8313, Residential Street Rehabilitation, Construction, and Overlay Project, to the California Transportation Commission.
FISCAL IMPACT: This item relates to submitting projects to the state; it does not modify specific funding.
The City is projected to receive $2,353,959 in SB 1 funds for Fiscal Year 2022/23; if the City Council does not adopt a Project List, the City would not be eligible to receive this funding.
EXHIBITS:
1.City Council Resolution No. 2022- , adopting the Fiscal Year 2022/23 SB 1 Road Repair and Accountability Act Project List
2.List of local street and road repair projects proposed to receive SB 1 funds (Exhibit A to Resolution) 06/14/2022 C13 Page 2 of 8
00107813 1
RESOLUTION NO. 2022-
A RESOLUTION OF THE CITY COUNCIL OF THE CHARTERED CITY OF VISTA, CALIFORNIA, ADOPTING THE FISCAL YEAR 2022/23 SB 1 ROAD REPAIR AND
ACCOUNTABILITY ACT PROJECT LIST
The City Council of the City of Vista does resolve as follows:
1. Findings. The City Council hereby finds and declares the following:
A.Senate Bill 1 (SB 1), the Road Repair and Accountability Act of 2017 (Chapter 5, Statutes of 2017) was passed by the Legislature and signed into law by the Governor in April 2017 to address the significant multi-modal transportation funding shortfalls statewide.
B.SB 1 includes accountability and transparency provisions that will ensure the residents of the City of Vista are aware of the projects proposed for funding in our community and which projects have been completed each fiscal year.
C.The City Council of the City of Vista must adopt by resolution at a public meeting a list of projects proposed to receive fiscal year funding from the Road Maintenance and Rehabilitation Account (RMRA), created by SB 1, which must include a description and the location of each proposed project, a proposed schedule for the project’s completion, and the estimated useful life of the improvement.
D.The City of Vista will receive an estimated $2,353,959 in RMRA funding in Fiscal Year 2022/23 from SB 1.
E.This is the fifth year in which the City of Vista is receiving SB 1 funding and will enable the City of Vista to continue essential road maintenance and rehabilitation projects, safety improvements, repairing and replacing aging bridges, and increasing access and mobility options for the traveling public that would not have otherwise been possible without SB 1.
F.The City of Vista has undergone a robust public process to ensure public input into our community’s transportation priorities/the project list.
G. The City of Vista used a Pavement Management System to develop the SB 1 project list to ensure revenues are being used on the most high-priority and cost-effective projects that also meet the communities priorities for transportation investment.
H.The funding from SB 1 will help the City of Vista maintain and rehabilitate 146 streets throughout the City of Vista this year and similar projects into the future.
I.The 2018 California Statewide Local Streets and Roads Needs Assessment found that the City of Vista streets and roads are in a “good” condition and this revenue will help us increase the overall quality of our road system and will help keep its streets and roads into a “good” condition.
J.The SB 1 project list and overall investment in our local streets and roads infrastructure with a focus on basic maintenance and safety, investing in complete streets infrastructure, and using cutting-edge technology, materials and practices, will have significant positive co-benefits statewide.
06/14/2022 C13 Page 3 of 8
EXHIBIT 1
00107813 1
RESOLUTION NO. 2022-
CITY COUNCIL OF THE CHARTERED CITY OF VISTA
PAGE 2
2. Action.
A. The list of newly proposed projects that will be funded in-part or solely with Fiscal Year 2021/22 Road Maintenance and Rehabilitation Account revenues, as set forth in Exhibit A, is adopted by the City Council of the City of Vista.
3.Adoption. PASSED AND ADOPTED at a meeting of the City Council of the City of Vista held on June 14, 2022, by the following vote:
AYES:
NOES:
ABSTAIN:
JUDY RITTER, MAYOR
APPROVED AS TO FORM:
WALTER C. CHUNG, ACTING CITY ATTORNEY
By:
Attachment: Exhibit A
APPROVED
Walter C. Chung
20220602105707
ATTEST:
KATHY VALDEZ, CITY CLERK
By: _________________________________
06/14/2022 C13 Page 4 of 8
EXHIBIT A
The following list of newly proposed projects will be funded in-part or solely with Fiscal Year 2022-23 Road Maintenance and Rehabilitation Account revenues:
Project Title: CIP No. 8313 – Residential Street Rehabilitation, Construction and Overlay
Project Description: This project includes rehabilitation and maintenance of asphalt concrete street pavement areas, including replacement of deteriorated asphalt concrete street sections, overlay, and slurry seal. Work also includes replacement of curb ramps; repair of distressed curbs and gutters; and repair of sidewalks; as well as re-striping.
Project Location: The location of work will be along the following 146 street segments:
Activity Dr ( 725' N/Specialty Dr to Poinsettia Av )
Alderwood Cir ( White Birch Dr to End )
Amber Ln ( Eucalyptus Av to 220' S/Eucalyptus Av )
Anza Av (Bobier Drive to Arcadia Av)
Applewood Ln ( Sequoia Crest to City Limits )
Arcadia Av (Anza Av to E. Vista Way)
Avalon Dr ( Crescent Dr to Eucalyptus Av )
Avenida de Benito Juarez (W. California Av to Avenida de la Plaza) Balboa Cir ( Columbus Way to Columbus Way )
Baxter Cyn Rd ( Eastbrook Rd (N) to Eastbrook Rd (S) )
Beaumont Dr ( Eucalyptus Av to Coventry Rd )
Bel Air Dr W ( Alta Vista Dr to End )
Bellerive Ct ( Bellerive Dr to End )
Bellerive Dr ( Alta Vista Dr to Girard Way )
Bellerive Dr ( Girard Way to End )
Birch St ( Cades Way to Dogwood Way )
Bonair Rd ( Palomar Pl N/S to 300' N/Palomar Pl )
Bonair Rd ( Palomar Pl S/S to Foothill Dr )
Brewley Ln ( Live Oak Rd to Gateway Dr )
Brookhaven Pass ( Faraday St to Sycamore Av )
Brookhaven Pass ( Sycamore Av to Mountain Pass Cir )
Cabot Ct ( Columbus Way to End )
Cades Way ( Grand Av to End )
Calle Sinaloa ( Warmlands Av to Beverly Dr )
Calle Tijera ( Warmlands Av to End )
Catalina Av ( 190' E/Acropolis Pl to End )
Cherrywood St ( White Birch Dr to Alderwood Cir )
Clark Ct ( Coronado Pl S/S to End )
Clearwater Ridge ( Melrose Dr S to Ridgeline Av )
Cloverleaf Ct ( Brewley Ln to End )
Club Heights Ln ( Countryside Dr N/S to End )
Columbus Way ( Balboa Cir (S) to Shadowridge Dr S/S (W) ) Columbus Way ( Shadowridge Dr S/S (E) to Sonora Ct )
06/14/2022 C13 Page 5 of 8EXHIBIT 2
Columbus Way ( Sonora Ct to Balboa Cir (S) )
Coronado Pl ( Lupine Hills Dr to Magellan Ln )
Country Squire ( Countryside Dr N/S to End )
Countryside Dr ( Club Heights Ln to Countryside Pl )
Countryside Dr ( Countryside Pl to Melrose Dr S (N) )
Countryside Dr ( Melrose Dr S (S) to Club Heights Ln )
Countryside Pl ( Countryside Dr to End )
Coventry Rd ( Alta Vista Dr to Beaumont Dr )
Crescent Ct ( Crescent Ln W/S to End )
Crescent Dr ( Civic Center Dr to Orleavo Dr )
Crescent Ln ( Crescent Dr S/S to End )
Cromwell Way ( Alta Vista Dr N/S to End )
Cypress Dr ( Loni Ln to Santa Fe Av S N/S )
Cypress Dr ( Monte Vista Dr S/S to Loni Ln )
Dawson Dr ( Melrose Dr S to End )
Dawson Dr ( Ridgeline Av to Melrose Dr S )
Decision St ( 1255' W/Poinsettia Av to Scott St )
Dogwood Way ( La Mirada Dr to Grand Av )
Dolphin Cir ( Elm Dr E/S to End )
Eastbrook Rd ( Brookhaven Pass (N) to Reflection Cir )
Eastbrook Rd ( Reflection Cr to Brookhaven Pass (S) )
Elm Dr ( Warmlands Av to Independence Way )
Enterprise Ct ( Progress St to End )
Exectutive Ridge ( Poinsettia Av to End )
Fortune Way ( La Mirada Dr to End )
Foxtail St ( Brewley Ln to Shadowridge Dr )
Girard Ct ( Girard Way to End )
Girard Way ( Coventry Rd to Bellerive Dr )
Goldenrod Ln ( Lupine Hills Dr to End )
Grand Av ( Cades Way to Dogwood Way )
Grand Av ( Pointsettia Av to End )
Grand Av ( Sycamore Av to Cades Way )
Hatcreek Ct ( Lemonwood Ln to End )
Hot Springs Way ( Sycamore Av to End )
Independence Way ( Monte Mar Rd to Elm Dr )
Independence Way ( Warmlands Av to Monte Mar Rd )
Jasmine Ct ( Goldenrod Ln to End )
Jewell Ridge ( Opal Ridge to Dawson Dr )
Keystone Way ( Business Park Dr to End )
La Salle Ct ( Columbus Way to End )
Lemonwood Ln ( Brewley Ln to End )
Lewis Ct ( Coronado Pl S/S to End )
Lexington Dr ( Coventry Rd to Coventry Rd )
Liberty Way ( Business Park Dr to Scott St )
06/14/2022 C13 Page 6 of 8
Lindy Ln ( Monte Vista Dr N/S to End )
Lionshead Av ( Buisness Park Dr to City Limits )
Lynmar Ln ( Coventry Rd to Alta Vista Dr )
Lynmar Ln ( Coventry Rd to End )
Magellan Ln ( Lupine Hills Dr to Coronado Pl )
Meadow Lake Dr ( Vista Way E E/S to Glenmere Rd E/S )
N. Melrose (Oceanside Blvd to W. Vista Way)
Mesa Verde Dr ( (SPUR W) 550' W/Beverly Dr to End (W Cul-de-sac) ) Mesa Verde Dr ( (SPUR) 200' W/Beverly Dr to End (E Cul-de-sac) ) Monte Mar Rd ( Warmlands Av to Grandview Rd )
Moonglow Ct ( Brewley Ln N/S to End )
Mountain Pass Cir ( Melrose Dr S to End )
Oak Glen Dr ( Lupine Hills Rd to Oak Leaf Ct )
Oak Glen Dr ( Oak Leaf Ct to Live Oak Rd )
Oak Leaf Ct ( Oak Glen Dr to End )
Oak Ridge Way ( Melrose Dr S to Park Center Dr )
Oak Ridge Way ( Park Center Dr to End )
Oakcreek Ct ( Green Oak Rd to End )
Oakcreek Ln ( Green Oak Rd to End )
Old Foothill Dr ( San Clemente Av (E) S/S to 253' S/ San Clemente Av ) Opal Ridge ( Clearwater Ridge to Dawson Dr )
Opal Ridge ( Dawson Dr to End )
Opal Ridge ( Ridgeline Av to Clearwater Ridge )
Orange Grove Av ( Avalon Dr to Crescent Dr )
Palomar Pl ( Vista Way E to Oak Dr )
Park Center Dr ( Business Park Dr to End (N) )
Pearl Heights Rd ( Opal Ridge to Ridgeline Av )
Rancho Pacifica Pl ( Alta Vista Dr to End )
Reflection Cir ( Eastbrook Rd to End )
Ridgeline Av ( Opal Ridge to End )
San Clemente Av ( Calle Huerto to Luziero Dr )
San Clemente Av ( Foothill Dr to Calle Huerto )
Sapphire Ln ( Ridgeline Av to Opal Ridge )
Scott St ( Business Park Dr to Decision St )
Scott St ( Keystone Way to Liberty Way )
Scott St ( Liberty Way to Business Park Dr )
Sequoia Crest ( Applewood Ln to White Birch Dr )
Sequoia Crest ( Shadowridge Dr to Applewood Ln )
Shadow Ln ( Orange Grove Av to End )
Sierra Verde Dr ( Civic Center Dr to Gate )
Sonora Ct ( Columbus Way to End )
Specialty Dr ( Poinsettia Av to Decision St )
Stonecrest Ct ( Brewley Ln to End )
06/14/2022 C13 Page 7 of 8
Sycamore Av ( Melrose Dr S to Brookhaven Pass )
Tiger Tail Ln ( Tiger Tail Rd to End )
Tiger Tail Rd ( Eucalyptus Av to Beaumont Dr )
Via Christina ( (SPUR N) 560' W/Loop (N) begin to End ) Via Christina ( Foothill Dr to Via Pedro )
Via Christina ( Via Christina (Loop North begin) to Via Christina (Loop South end) )
Via Christina ( Via Pedro to Via Christina )
Via Pedro ( Via Christina to 590' S/Via Christina )
Vista Grande Dr ( Elevado Rd to City Limits )
Vista Grande Dr ( Warmlands Av to Elevado Dr )
Warmlands Av ( Foothill Dr to Calle Sinaloa )
White Birch Dr ( Alderwood Cir to Redwood Crest )
White Birch Dr ( Redwood Crest to End )
White Birch Dr ( Shadowridge Dr to Alderwood Cir )
Windsor Ct ( Avalon Dr to End )
Wolverine Way ( Beverly Dr to End )
Zada Ln ( Beaumont Dr to End )
Estimated Project Schedule: Start 07/2022 – Completion 06/2023 based on the components being funded with RMRA funds.
Estimated Project Useful Life: 15 years for overlay and 5 years for slurry seal 06/14/2022 C13 Page 8 of 8