ACTION:
____________________________
Clerk/Secretary
Department: Engineering Item No: C5
Prepared by:

Erin Adams, Management Analyst
Jason Rivera, Capital Projects Manager Meeting Date: February 14, 2023 Approved by:

Greg Mayer, City Engineer
Amanda Lee, Acting City Manager Agenda Location: Consent Calendar SUBJECT: CIP 8312: TOWNSITE DRIVE COMPLETE STREETS PROJECT – AWARD OF

CONTRACT
RECOMMENDATION: Adopt City Council Resolution No. 2023- , awarding a construction contract to L.C. Paving & Sealing, Inc. for the Townsite Drive Complete Streets Project (CIP No. 8312).

CORRELATION TO CITY COUNCIL GOALS: (1) Fiscal Responsibility, (2) Climate and Environmental Responsibility, and (3) Traffic: Continue to improve the flow of traffic for all forms of travel, reduce congestion, and improve our roads and sidewalks.

PRIOR ACTION: On June 28, 2022, adopted City Council Resolution No. 2022-108, approving a Six- Year Capital Improvement Program and FYs 2022/23 and 2023/24 Capital Project Budget and authorizing appropriations for Fiscal Years 2022/23 and 2023/24 Capital Projects (Vote: 4-0, Ritter absent (Ritter experienced technical difficulties)).

STATEMENT ON THE SUBJECT: Capital Improvement Project (CIP) No. 8312, Townsite Drive Complete Streets Project, will transform Townsite Drive and W. Los Angeles Drive into a calmed environment, where all users are safely accommodated by constructing sidewalks, traffic circles, curb extensions, bike lanes, sharrows and high visibility crosswalks. The project will also construct curb extensions, bus stop shelters, and two mid-block pedestrian traffic signals on N. Santa Fe Avenue between Orange Street and Bobier Drive.

Staff advertised the project for competitive bids on December 22, 2022, on the City’s procurement website and online procurement portal, OpenGov. On January 17, 2023, the following seven bids were received:

Bidder’s Name Office Location Total Bid Amount
L.C. Paving & Sealing, Inc.Escondido, CA $3,150,284.05 I E General Engineering, Inc.Beaumont, CA $3,296,174.00 Dick Miller, Inc.San Marcos, CA $3,390,349.33
Portillo Concrete, Inc.Lemon Grove, CA $3,555,555.55
Granite Construction Company Carlsbad, CA $3,712,712.00 Blue Pacific Engineering & Construction San Diego, CA $3,837,574.00 LB Civil Construction Escondido, CA $4,322,721.50
Engineer’s Estimate: $3,576,000.00
AGENDA
REPORT

CITY COUNCIL

COMMUNITY DEVELOPMENT COMMISSION

SUCCESSOR AGENCY

BUENA SANITATION DISTRICT

JOINT POWERS FINANCING AUTHORITY
02/14/2023 C5 1 of 68
Approved above recommendation, adopted City Council Resolution No. 2023-11.

Vote: 5-0

MEETING DATE: February 14, 2023 PAGE 2
SUBJECT: CIP 8312: TOWNSITE DRIVE COMPLETE STREETS PROJECT —AWARD OF

CONTRACT
Staff reviewed the bid of$3,150,284.05 from L.C. Paving & Sealing, Inc., and determined they are the lowest responsible bidder who responded to all the requirements of the bid request. Therefore, staff recommends that the City Council award the contract for the Townsite Drive Complete Streets Project (CIP No. 8312) to L.C. Paving & Sealing, Inc.

FISCAL IMPACT: The construction contract is $3,150,284.05, with a 10 percent contingency for a total budget of$3,465,312.46. Sufficient funding is budgeted and available in the Fiscal Years 2022/23 and 2023/24 Capital Improvement Budgets in CIP No. 8312, Townsite Drive Complete Streets Source Appropriation Accounts (Nos. 1176203.578999.8312, 1106580.578999.8312, 1106595.578999.8312 and 1286565.578999.8312).

EXHIBITS:

1. City Council Resolution 2023- , awarding a construction contract to L.C. Paving & Sealing, Inc. for the Townsite Drive Complete Streets Project (CIP No. 8312)

2. Contract with L.C. Paving & Sealing, Inc.

3. Bid Documents
02/14/2023 C5 2 of 68

RESOLUTION NO. 2023-

A RESOLUTION OF THE CITY COUNCIL OF THE CHARTERED CITY OF VISTA, CALIFORNIA, AWARDING A CONSTRUCTION CONTRACT TO L.C.

PAVING & SEALING, INC. FOR THE TOWNSITE DRIVE COMPLETE
STREETS PROJECT (CIP NO. 8312)
The City Council of the City of Vista does resolve as follows:

1. Findings. The City Council hereby finds and declares the following:

A. The City solicited bids for the Townsite Drive Complete Streets Project (CIP No. 8312), and on January 17, 2023 public bids for construction were opened and L.C. Paving & Sealing, Inc. was the lowest bidder.

B. Staff determined that the bid submitted by L.C. Paving & Sealing, Inc. is responsive in all material aspects to the request for bids, and that the bid from L.C. Paving & Sealing, Inc. for construction of the Townsite Drive Complete Streets Project has been determined to be the lowest responsive, responsible bid.

2. Action.

A. The contract between the City of Vista and L.C. Paving & Sealing, Inc. in the amount of $3,150,284.05 is approved, and the Mayor is authorized to execute the contract.

3. Adoption. PASSED AND ADOPTED at a meeting of the City Council of the City of Vista held on February 14, 2023, by the following vote:

AYES:

NOES:

ABSTAIN:

JOHN B. FRANKLIN, MAYOR
APPROVED AS TO FORM: ATTEST:

WALTER CHUNG, CITY ATTORNEY KATHY VALDEZ, CITY CLERK By: By:

APPROVED
Walter C.Chung
20230202162143
000292137 EXHIBIT 1
02/14/2023 C5 3 of 68

CONSTRUCTION CONTRACT
THIS CONTRACT is made and entered into as of
("Contract Date"), by and between the City of Vista, a chartered municipal corporation ("Agency"), and L.C. Paving & Sealing, Inc., a California corporation ("Contractor"). Agency and Contractor are sometimes individually referred to as a "Party" and collectively as "Parties." In consideration of the mutual covenants contained herein, Agency and Contractor agree as follows:

SECTION 1
The Contract Documents consisting of the PROJECT SPECIFICATIONS, comprised of the NOTICE INVITING BIDS, the INSTRUCTIONS TO BIDDERS, the accepted BID PROPOSAL; BID SCHEDULE; CONTRACTOR'S LICENSING STATEMENT; PROJECT REFERENCES; CONTRACTOR'S LIST OF SUBCONTRACTORS; EQUAL EMPLOYMENT OPPORTUNITY CERTIFICATION; NONLOBBYING CERTIFICATION FOR FEDERAL-AID CONTRACTS; DISCLOSURE OF LOBBYING ACTIVITIES (IF REQUIRED); DEBARMENT AND SUSPENSION CERTIFICATION; PUBLIC CONTRACT CODE STATEMENTS AND QUESTIONNAIRE; NON-COLLUSION AFFIDAVITS; BID SECURITY FORM (WITH BID BOND, CASH, CERTIFIED CHECK OR CASHIER'S CHECK INCLUDED); EXHIBIT 15-G LOCAL AGENCY BIDDER DBE COMMITMENT (CONSTRUCTION CONTRACT); EXHIBIT 15- H DBE INFORMATION — GOOD FAITH EFFORT, the CONSTRUCTION CONTRACT,

PAYMENT BOND, CONTRACTOR'S CERTIFICATE, SUPPLEMENTARY GENERAL PROVISIONS, SUPPLEMENTARY TECHNICAL PROVISIONS, Special Provisions, Plans, Standard Plans and Specifications; together with all additions, deletions, modifications, appendices, and all addenda (No. 1), as prepared prior to the date of bid opening setting forth any modifications or interpretations of any said documents, are hereby incorporated in and made a part of this Contract as fully as if set forth herein.

SECTION 2
For and in consideration of the payments and agreements to be made and performed by the Agency as set forth in said Contract Documents, the Contractor agrees with the Agency to construct
TOWNSITE DRIVE COMPLETE STREETS PROJECT (CIP NO. 8132)
as specifically set forth in documents entitled
TOWNSITE DRIVE COMPLETE STREETS PROJECT (CIP NO. 8312)
for which award of the Contract was made, to furnish at his own proper cost and expense all plant, labor, services, materials, tools, equipment, supplies, transportation, utilities and all other items and facilities necessary therefore, as provided in the Contract Documents, and to do everything required therein. In accordance with the provisions of Section 3700 of the Labor Code, the Contractor will be required to secure the payment of Worker's Compensation Insurance for its employees.

SUMMARY CONST-COV FED CALTRANS Page 1 of 3 L.C. PAVING&SEALING, INC. [00064029-1]00110322 1 EXHIBIT 2
02/14/2023 C5 4 of 68

SECTION 3
For furnishing all said services and materials, payment of premiums on insurance policies, obtaining all permits and licenses of a temporary nature, furnishing and removing all plant, temporary work or structures, tools, and equipment, and for doing all the Work contemplated and embraced in this Contract, also for all loss and damage arising out of the nature of the aforesaid work during its progress or prior to acceptance from the action of the elements and from any unforeseen difficulties which may arise or be encountered in the prosecution of the Work, and for all other risks of any description connected with the Work, also for all expenses incurred by or in consequence of the suspension or discontinuance of work, except such as in the said Contract Documents are expressly stipulated to be borne by the Agency, and for well and faithfully completing the Work and the whole thereof within the stipulated time and in the manner shown and described in the said documents, and in accordance with the requirements of the Engineer under them, the Agency will pay, and the Contractor shall receive in full compensation therefore, the prices set forth by him in the accepted bid. The total compensation will be computed on the basis of the units of work actually performed in accordance with the requirements of the Contract Documents and paid for at the stipulated prices named in the BID SCHEDULE for completion of the Work.

SECTION 4
The Agency hereby promises and agrees with the said Contractor to employ, and does hereby employ the said Contractor to provide the materials and to do the Work according to the terms and conditions herein contained and referred to, for the price aforesaid, and hereby contracts to pay the same at the time, in the manner, and upon the conditions set forth in the Contract Documents, and the Parties for themselves, their heirs, executors, administrators, successors and assigns do hereby agree to the full performance of the covenants herein contained.

SECTION 5
Contractor agrees to indemnify, defend, and save harmless, the Agency, its officers, agents, employees and volunteers from and against any and all claims, demands, damages, losses and expenses, defense costs including attorney fees, or liability of any kind or nature which the Agency, its officers, agents and employees may sustain or incur or which may be imposed upon them for injury to or death of persons, or damage to property as a result of, arising out of, or in any manner connected with the Contractor's performance under the terms of this Contract, caused in whole or in part by any negligent or willful acts or omission of the Contractor, any subcontractor, anyone directly or indirectly employed by any of them or anyone for whose acts any of them may be liable, except where caused by the active negligence, sole negligence, or willful misconduct of the Agency.

SECTION 6
Contractor agrees that the Payment Bond and Performance Bond attached to/submitted concurrently with this Contract are for reference purposes only, and shall not be considered a part of this Contract. Contractor further agrees that said bonds are separate obligations of the Contractor and its surety, and that any attorneys' fee provision contained in any payment bond or performance bond shall not apply to this Contract. In the event there is any litigation between the Parties arising from the breach of this Contract, each Party will bear its own attorneys' fees in the litigation.

SUMMARY CONST-COV FED CALTRANS Page 2 of 3 L.C. PAVING&SEALING, INC. [00064029-11 00110322 1
02/14/2023 C5 5 of 68

SECTION 7
Contractor agrees to abide by all required contract provisions of federal-aid construction contracts per Exhibit A, which is hereby incorporated in and made a part of this Contract as fully as if set forth herein. Contractor agrees to pay generally prevailing wages per the Federal Prevailing Wage Rate Determination as provided in Exhibit B or pursuant to California law (8 CCR § 16001) where California prevailing wage rates are higher than the applicable federal rate.

IN WITNESS WHEREOF, the Parties have caused this Contract to be executed as of the Contract Date.

CITY OF VISTA, a chartered municipal L.C. PAVING & SEALING, INC., a corporation California corporation
By:

By:

JOHN FRANKLIN, MAYOR
Name/Title
ATTEST:

KATHY VALDEZ, CITY CLERK By:

By:

Name/Title
APPROVED AS TO FORM:

WALTER CHUNG, CITY ATTORNEY
By:

RISK MANAGEMENT REVIEW:

DOLORES GASCON, RISK MANAGER
By:

APPROVED
Amanda L.Guy
20230119092449
SUMMARY CONST—COV FED CALTRANS Page 3 of 3 L.C. PAVING&SEALING, INC. [00064029-1]00110322 1
02/14/2023 C5 6 of 68

PROPOSAL FORAYS

BID PROPOSAL
From: LC Paving& Sealing. Inc. Bidder,
To: City of Vista, City Clerk's Office
200 Civic Center Drive
Vista, CA 92084-6275
For: The construction of

STREET IMPROVEMENTS
as specifically set forth in documents entitled
TOWNSITE DRIVE COMPLETE STREETS PROJECT- CIP NO. 8312
Federal Project No.ATPL-5382(038)
The undersigned hereby proposes and agrees that if his bid as submitted in the attached BID SCHEDULE be accepted, he will contract in the form so approved to perform all work for which a Contract may be awarded him,to furnish any and all plant, labor,services, materials,tools,equipment, supplies, transportation, utilities and all other items and facilities necessary therefore as provided in the Contract Documents,and to do everything required therein for the proposed Project as specifically set forth in said Contract Documents, together with appurtenances thereto, all as set forth on the Drawings and in the Project Specifications and other Contract Documents; and he further proposes and agrees to complete all the Work called for by the Drawings, Project Specifications, and other Contract Documents in strict conformity therewith within the time limits sel. forth therein; and that he will accept as full payment therefore the prices set forth in the BID SCHEDULE forming a part hereof.

The undersigned hereby submits either a Bid Bond or Bid Security in the form of Cash, a Cashier's Check,or a Certified Check, using the forms included in these Bid Documents, properly made payable to CITY OF VISTA, hereinafter designated as the Agency,in an amountthat is at leastten percent(10%) of the total base bid amount The Bid Bond or Bid Security is attached hereto and is given as a guaranty that the undersigned will execute the Contract and furnish the required bonds if awarded the Contract and, in case of failure to do so within the time provided,the proceeds of said bond or bid security shall be forfeited to the Agency. The Surety's liability to the Agency for forfeiture of the face amount of the bond shall be considered as established.
23 02/14/2023 C5 7 of 68

It is understood and agreed that:

1. The undersigned has carefully examined all Bid documents and other Documents which will form the Contract, including all addenda as prepared prior to the date of bid opening setting forth any modifications or interpretations of any said documents.

2. The undersigned has, by investigating the site of work, by reviewing and analyzing the Plans and Specifications, and by otherwise familiarizing himself with the Project, has satisfied himself as to the nature and location of the Work and has fully informed himself as to all conditions and matters which can in any way affect the Work or the cost thereof.

3. The undersigned fully understands the scope of the Work and has included in the various related items of Work the cost of all work not listed as a separate item so that the Bid for the Project reflects the total cost for completing the Work in its entirety, has checked carefully all words and figures inserted in this Bid, and he further agrees that the Agency shall in no way be responsible for any errors or omissions in the preparation of this proposal.

4. The undersigned will execute the Contract and furnish the required Performance Bond, Payment Bond,and proof of insurance coverage within the stipulated time after the posting of a notice to him of acceptance of his bid by the Agency; and further, that this bid may not be withdrawn for a period of ninety(90)Calendar days after the date set for the opening thereof unless otherwise required by law. If any bidder shall withdraw his bid within said period, the bidder shall be liable under the provisions of the Bid Security, or the bidder and his surety shall be liable under the Bid Bond, as the case may be.

5. The surety or sureties and insurance companies named in the space provided have agreed to furnish bonds, insurance,and endorsements in the form and amounts setforth in the Contract Documents in the event the Contract is awarded on the basis of this proposal.

6. The undersigned hereby certifies that this proposal is genuine and not sham or collusive or made in the interest or in behalf of any person not herein named, and the undersigned has not directly or indirectly induced or solicited any other bidder to put in a sham bid, or any other person,firm or corporation to refrain from bidding,and the undersigned has not in any manner sought by collusion to secure for himself an advantage over any other bidder.

7. In conformance with current statutory requirements of Section 1860, et. Seq., of the Labor Code of the State of California,the undersigned confirms the following as his certification:
"I am aware of the provisions of Section 3700 of the Labor Code which require every employer to be insured against liability for workers' compensation or to undertake self-insurance in accordance with the provisions of that Code, and I will comply with such provisions before commencing the performance of the work of this contract."

8. Receipt of Addenda No. through J_is hereby acknowledged. (If none, write "NONE"}. 24 02/14/2023 C5 8 of 68

9. The prospective bidder certifies, by INITIALING AFTER THE FOLLOWING STATEMENT and by signing and submitting this bid,to the best of his or her knowledge and belief,that:

No federal appropriated funds have been paid or will be paid, by or on behalf of the undersigned, to any person influencing or attempting to influence an officer or employee of any federal agency, a Member of Congress, an officer or employee of Congress, or an employee of a Member of Congress in connection with the awarding of any federal contract, the making of any federal grant,the making of any federal loan, the entering into of any cooperative agreement, and the extension, continuation, renewal, amendment, or modification of any frralntract, grant, loan, or cooperative agreement.

Initials
Ifanyfunthan federal appropriated funds have been paid or will be paid to any person for influencing or attempting to influence an officer or employee of any federal agency, a Member of Congress, an officer or employee of Congress, or an employee of a Member of Congress in connection with this federal contract, grant, loan, or cooperative agreement, the undersigned shall complete and submit Standard Form-LLL, "Disclosure of Lobbying Activities," in accordance with its instructions.

This certification is a material representation of fact upon which reliance was placed when this transaction was made or entered into. Submission of this certification is a prerequisite for making or entering into this transaction imposed by Section 1352, Title 31, U.S. Code. Any person who fails to file the required certifications shall be subject to a civil penalty of not less than $10,000 and not more than $100,000 for each such failure.

The prospective participant also agrees by submitting his or her bid or proposal that he or she shall require that the language of this certification be included in all lower tier subcontracts, which exceed $100,0000 and that all such sub-recipients shall certify and disclose accordingly.

10. In compliance with the Notice Inviting Bids and all the provisions hereinbefore stipulated, the undersigned, with full cognizance thereof, hereby proposes to perform the entire work for the prices set forth in the attached BID SCHEDULE upon which award of the Contract is made. (Continued on next page)
25 02/14/2023 C5 9 of 68

DATE: , 20 7 BIDDER'S AM E L avin & Scaling, Inc.

BY
Si Lure
se Salinas
Printed Name
TITLE President
BY
Signature
Printed Name
TITLE
(CORPORATE SEAL) BIDDER'S MAILING ADDRESS:

Name and address of all members 620 Al ine Way Escondido CA 92029 of the firm or names of all officers
of the corporation.

CORPORATION ORGANIZED UNDER THE LAWS
Josc Salinas: President Vice President OF THE STATE OF -and Sem= California.

CONTRACTOR'S LICENSE # 621610
EXPIRATION DATE 08/31/2024
CONTRACTOR'S LICENSE CLASS A, B, & C-12
SURETY OR SURETIES: Alliant Insurance Services
INSURANCE COMPANY:

I certify (or declare) under penalty of perjury under the laws of the State of California that the foregoing is true and correct:
r �
Date A6fOR'S SIGNATURE
26 02/14/2023 C5 10 of 68

BID SCHEDULE
To be completed through the City's Electronic Bidding System (ProcureNow) Pursuant to and in compliance with the Notice Inviting Bids and other Contract Documents relating to the proposal for the construction of

STREETS IMPROVEMENTS
as specifically set forth in documents entitled
TOWNSITE DRIVE COMPLETE STREETS PROJECT- CIP NO.8312
Federal Project No.ATPL-5382(038)
all in accordance with the Project Specifications on file at the City of Vista Engineering Department, the undersigned bidder, having familiarized himself with the terms of the Contract,the local conditions affecting the performance of the Contract and the cost of the Work at the place the Work is to be done; and with the Plans, Project Specifications and other Contract Documents, hereby stipulated; the Contractor agrees to complete the Contract, including all of its component parts and everything required to be performed, and to provide and furnish any and all labor, materials, tools, equipment, expendable supplies and all utility and transportation services necessary to perform the Contract, and complete in a workmanlike manner all of the Work required in connection with the Contract, all in strict conformance with the Plans and Project Specifications on file at the City of Vista Engineering Department.

All items shall be finished and functional per Plans and the Contract Documents. Items designated with an 'S' in the Bid Item column of the Bid Schedule are Specialty Items per Subsection 2-3.2 ("Self Performance") of the San Diego Regional Supplement to the Greenbook. There are NO designated Specialty Items in this Project.
27 02/14/2023 C5 11 of 68

DESCRIPTION OF BASE BID ITEMS
(Bidders to scan and Include with Bid package)
TOWNSITE DRIVE COMPLETE STREETS PROJECT- CIP NO.8312
Federal Project No.ATPL-5382(038)
General
Bfid—Item 1 - Mobilization & Demobilization: Bid item shall include full compensation for all bonds, insurance, sureties, licenses, permits, facilities, labor, equipment and material necessary to complete all work required in advance of construction operations, and upon the initiation of construction operations, to mobilize all required equipment, materials and personnel on-site, and complete all associated and appurtenant work in accordance with the Standard Specifications, the Supplementary General Provisions, and as directed by the Engineer. The Bid Item shall also include all labor, equipment and material required to clean-up and restore the site, demobilize and remove all equipment, materials, staging and temporary BMPs, and complete all work required at the end of construction operations in accordance with the Standard Specifications,the Supplementary General Provisions of these Specifications, and as directed by the Engineer. The lump sum price for this item shall not exceed 5%of the total contract price (5% maximum of Total Base Bid and Additive Alternate Bid Combined).

Bid Item 2 - Prroiect Information Sigma: Bid item shall include full compensation for all coordination, labor, equipment and material required to furnish and place project information signs per Section 7-12.1 of the Supplementary Provision of these Specifications.

Bid Item 3. Public Notification per Supplementary General Provisions, Section 7-12.2. Bid item shall include all necessary labor, equipment, materials, and all other related costs for preparation, copying, and distribution shall be considered as included in the lump sum price Bid for Public Notification Bid Item 4 - Storm Water Pollution Prevention and Erosion Control Plan. SWPPP: Bid item shall include full compensation for labor, materials and equipment to review, modify, implement SWPPP, all work necessary to complete a project NOI, certify the project SWPPP, compile and submit project PRDs (Permit Registration Documents), appoint a project QSD and QSP, install all required construction phase BMPs, complete all required pre-construction SWPPP documentation and associated work as required to ensure the project's full compliance with State Water Resources Board's General Construction Permit(Order No. 2009-0009-DWQ)and Section 7-8.6 of the Supplementary General Provisions.

Bid Item 5 - Corm Water Pollution Prevention and Erosion Control: Bid item shall include full compensation for all labor, equipment and materials required to complete all work necessary to place, maintain, repair and replace all temporary construction BMPs in accordance with Section 7-8.6 of the Supplementary General Provisions of these Specifications and the City of Vista Stormwater Management Permit Application Form & Reference Information in the Appendices to these Specifications. Also, see Subsection 7-8.1 of the Supplementary General Provisions of these Specifications and the City of Vista's Waste Management Plan form in the Appendices to these Specifications. Bid item shall include all necessary labor, equipment, materials, and all other related costs for preparation, installation and adjustments shall be considered as included in the bid price.

Bid Item 6 --Traffic Control and Opristruction Staging Bid item shall include full compensation for all labor, equipment and materials required to complete all work required to prepare, submit and obtain approved Traffic Control Plans from the City of Vista Traffic Engineering Division; handle traffic (including flagging costs and person(s)to safely control pedestrian and vehicular traffic),furnish tools, equipment and incidentals,and for doing all work involved in staging constructing, furnishing, placing, removing, storing, maintaining, moving to new locations, replacing and disposing of the components of the traffic control system(including traffic control devices, temporary steel plate bridging, temporary road resurfacing); installation and removal of all required temporary 28 02/14/2023 C5 12 of 68

striping and signing associated and appurtenant work as specified in the Standard Specifications, Section 7-10 of the Supplementary General Provisions of these Specifications, and as directed by the Engineer. This bid item shall also include the completion, submittal and processing of a no-fee encroachment permit (application form is included in the Appendices to these Specifications).

Bid Item 7 - Utiltty Potholing-: Bid item shall include full compensation for all coordination, labor, equipment and material required to locate, protect and restore all existing utilities and improvements which "may be affected" or "are affected" bythe Work in accordance with the Standard Specifications,the Supplementary General Provisions of these Specifications, and as directed by the Engineer. The location, protection, and restoration of existing utilities and improvements (including street pavements, sidewalks and landscaping/irrigation), specifically identified for payment under other bid items shall not be included for payment within this bid item. All other location, protection and restoration required to complete the Work shall be incorporated into this bid item. The City will provide utility as builts.

Bid Item S -Survey Monument Preservation: Bid item shall include full compensation for all labor, equipment and materials required to complete all work required for the preservation of survey monuments.

Bid Item 9 - Record DrawingrAs_Buitt") Plans {stipulated amount): Bid item shall include full compensation for all labor,equipment and material required to provide City with accurate"red line" plans showingthe exact location of all improvements, existing utilities,that have been modified as part of the Work.

REMOVAL DISPOSAL/SALVAGE/ REPLACEMENT/RECONSTRUCT/RELOCATE/ADJUSTMENT Bid Item 10 - Clearing and Grubbing_ Bid item shall include full compensation for all labor, equipment and material required to complete all work necessary to remove and dispose all natural and artificial objectionable material within the limits of excavation,as required to complete the Work and additional clearing and grubbing as may be identified within the Contract including but not limited to, landscaping, vegetation, trees, roots, stumps, irrigation, yard drains, concrete pavement, pavers, concrete walks, curbs, gutters, cross gutters, spandrels, curb ramps, curb returns, driveways, sawcuts, cold plane, all AC and concrete surface improvements, mailboxes, fencing, walls, gates and private encroachments in the right of way (which interfere with the proposed work) in accordance with the Standard Specifications, the Supplementary General Provisions, the Supplementary Technical Provisions 300-1, as shown on the Plans and as directed by the Engineer and any other related work shall be considered as included or included in the costs of other work. Existing thickness may vary. No additional compensation will be made.

Bid ttern 11 - Remove and disposp, of existing AC Me Bid item shall include full compensation for all labor, equipment and material required to complete all work necessary to remove and dispose all AC Dike (Berm) within the limits of excavation in accordance with the Standard Specifications, the Supplementary General Provisions, the Supplementary Technical Provisions, as shown on the Plans and as directed by the Engineer and any other related work shall be considered as included or included in the costs of other work. Existing thickness may vary. No additional compensation will be made.

Bid Item 12 7--_ftmove,andi f xi n P i w Ik: Bid item shall include full compensation for all labor, equipment and material required to complete all work necessary to remove and dispose all PCC sidewalk including curb ramps within the limits of excavation in accordance with the Standard Specifications, the Supplementary General Provisions, the Supplementary Technical Provisions, as shown on the Plans and as directed by the Engineer and any other related work shall be considered as included or included in the costs of other work. Existing thickness may vary. No additional compensation will be made. 29 02/14/2023 C5 13 of 68

Bid Item 13 - Remove an dispose f existingIRCCdENgLA ; Bid item shall include full compensation for all labor, equipment and material required to complete all work necessary to remove and dispose all PCC driveway within the limits of excavation in accordance with the Standard Specifications, the Supplementary General Provisions, the Supplementary Technical Provisions, as shown on the Plans and as directed by the Engineer and any other related work shall be considered as included or included in the costs of other work. Existing thickness may vary.

No additional compensation will be made.

Bid Item 14 - Remove and dispose of existing B" PCC curb and gutter, Bid item shall include full compensation for all labor, equipment and material required to complete all work necessary to remove and dispose all 6" PCC curb and gutter within the limits of excavation in accordance with the Standard Specifications,the Supplementary General Provisions, the Supplementary Technical Provisions, as shown on the Plans and as directed by the Engineer and any other related work shall be considered as included or included in the costs of other work. Existing thickness may vary. No additional compensation will be made.

Bid Item 15 - Remove and dispose gf e)OsUng AC pavement and base: Bid item shall include full compensation for all labor, equipment and material required to complete all work necessary to remove and dispose all AC pavement and base within the limits of excavation in accordance with the Standard Specifications, the Supplementary General Provisions, the Supplementary Technical Provisions, as shown on the Plans and as directed by the Engineer and any other related work shall be considered as included or included in the costs of other work. Existing thickness may vary. No additional compensation will be made.

Bid item 16 - Remove and Tispose of existing PCC pavement and base: Bid item shall include full compensation for all labor, equipment and material required to complete all work necessary to remove and dispose all PCC pavement and base within the limits of excavation in accordance with the Standard Specifications, the Supplementary General Provisions, the Supplementary Technical Provisions, as shown on the Plans and as directed by the Engineer and any other related work shall be considered as included or included in the costs of other work. Existing thickness may vary. No additional compensation will be made.

Bidltem 17 - Remove and dispose of existing PCC median- Bid item shall include full compensation for all labor, equipment and material required to complete all work necessary to remove and dispose all PCC median within the limits of excavation in accordance with the Standard Specifications, the Supplementary General Provisions, the Supplementary Technical Provisions, as shown on the Plans and as directed by the Engineer and any other related work shall be considered as included or included in the costs of other work. No additional compensation will be made.

Bid Item 18 - Remove and di se of existing guardrail: Bid item shall include full compensation for all labor, equipment and material required to complete all work necessary to remove and dispose all guardrail within the limits of excavation in accordance with the Standard Specifications, the Supplementary General Provisions, the Supplementary Technical Provisions,as shown on the Plans and as directed by the Engineer and any other related work shall be considered as included or included in the costs of other work. No additional compensation will be made.

Bid Item la- Remove an dispose of existing,driainage structures: Bid item shall include full compensation for all labor,equipment and material required to complete all work necessaryto remove and dispose all existing drainage structures within the project limits in accordance with the Standard Specifications, the Supplementary General Provisions, the Supplementary Technical Provisions, as shown on the Plans and as directed by the Engineer and any other related work shall be considered as included or included in the costs of other work. No additional compensation will be made.
30 02/14/2023 C5 14 of 68

Bid Item 20- Remove existingstOpingand Ravement markings y__grinding orsandblastingLBid item shall include full compensation for all labor, equipment and material required to complete all work necessary to remove and dispose all existing striping and pavement parking within the project limits in accordance with the Standard Specifications, the Supplementary General Provisions, the Supplementary Technical Provisions, as shown on the Plans and as directed by the Engineer and any other related work shall be considered as included or included in the costs of other work. No additional compensation will be made.

Bid Item 21- Remove and salvage existing,roadside signs and poles- Bid item shall include full compensation for all labor, equipment and material required to complete all work necessary to remove and dispose all existing roadside signs and poles within the project limits in accordance with the Standard Specifications, the Supplementary General Provisions, the Supplementary Technical Provisions, as shown on the Plans and as directed by the Engineer and any other related work shall be considered as included or included in the costs of other work. No additional compensation will be made.

Bid Item 22 - Relocate existing roadside signs and poles: Bid item shall include full compensation for all labor, equipment and material required to complete all work necessary for the relocation of existing roadside signs and poles within the project limits in accordance with the Standard Specifications, the Supplementary General Provisions,the Supplementary Technical Provisions, as shown on the Plans and as directed by the Engineer and any other related work shall be considered as included or included in the costs of other work. No additional compensation will be made.

Bid Rem 23-Adjus-texisting manholes to grade gerCtty of Vi9a 5 ndard Drawln WR-29: Bid item shall include full compensation for all labor, equipment and material required to complete all work necessary to adjust existing manholes to grade within the project limits in accordance with City of Vista Standard Drawing SWR-29, the Standard Specifications, the Supplementary General Provisions, the Supplementary Technical Provisions, as shown on the Plans and as directed by the Engineer and any other related work shall be considered as included or included in the costs of other work. No additional compensation will be made.

Bid Item 24- Reconstruct existing mailbox and120aLMCfty of Vista Standard Drawing SRF-D4 including reflectlye addre numbers in front and_51de of mailbox(2"minimum): Bid item shall include full compensation for all labor, equipment and material required to complete all work necessary to relocate, reconstruct, or replace existing mailbox and post per City of Vista Standard DrawingSRF-04 including reflective address numbers in front and side of mailbox (2" minimum) as shown on the plans, in accordance with the Contract Drawings, Standard Specifications,the Supplementary General Provisions,the Supplementary Technical Provisions and as directed by the Engineer, any other related work shall be considered as included or included in the costs of other work.

Earthwork
Bid Item 2 -SubgLade greparation: Bid item shall include full compensation for all labor,equipment and material required to complete all work necessary for the roadway, parkway, slope excavation, transitions to existing, grading, compaction, dewatering, export/dispose excess material, borrow, subgrade preparation and restoration as required to complete the Work in accordance with the Standard Specifications, the Supplementary General Provisions, the Supplementary Technical Provisions, typical section as shown on the Plans, the Plans and as directed by the Engineer and any other related work shall be considered as included or included in the costs of other work. No additional compensation will be made.
31 02/14/2023 C5 15 of 68

Storm Drain System
Bid Item 26- 18" (2000-D minimum) reinforced concrete storm drain pipe (RCP) r C of V Standard Drawing, DRN 2: Bid item shall include full compensation for all labor, equipment and material required to complete all work necessary to install 18" (2000-D minimum) reinforced concrete storm drain pipe (RCP) in accordance with City of Vista Standard Drawing DRN-02, as shown on the Plans and as directed by the Engineer and any other related work shall be considered as included or included in the costs of other work. No additional compensation will be made.

Bid Item 27 -Type 'B'curb inlet per SDRSD No. D-02 including-stencil (Size per Plans): Bid item shall include full compensation for all labor, equipment and material required to complete all work necessary to install Type 'B' curb inlet in accordance with San Diego Regional Standard Drawings (SDRSD) No. D-02, as shown on the Plans and as directed by the Engineer and any other related work shall be considered as included or included in the costs of other work. No additional compensation will be made.

Bid it
m 2 - Parkway Drain (per Plans): Bid item shall include full compensation for all labor, equipment and material required to complete all work necessaryto install Parkway Drains, as shown on the Plans and as directed by the Engineer and any other related work shall be considered as included or included in the costs of other work.

No additional compensation will be made
Bid Item 29 - Rectangular FIurne Drain r PI n5 : Bid item shall include full compensation for all labor, equipment and material required to complete all work necessaryto install Rectangular Flume Drain, as shown on the Plans and as directed by the Engineer and any other related work shall be considered as included or included in the costs of other work. No additional compensation will be made Bid Item 30 -- Drijinjige Ditch per SDRSQ No. D-7 : Bid item shall include full compensation for all labor, equipment and material required to complete all work necessary to install Drainage Ditch D-75, as shown on the Plans and as directed by the Engineer and any other related work shall be considered as included or included in the costs of other work. No additional compensation will be made Bid Item 31.-Sidewalk underdrain pipe perSDRSD No.D-27: Bid item shall include full compensation for all labor, equipment and material required to complete all work necessaryto install sidewalk underdrain pipe in accordance with San Diego Regional Standard Drawings (SDRSD) No. D-27, as shown on the Plans and as directed by the Engineer and any other related work shall be considered as included or included in the costs of other work. No additional compensation will be made.

Bid-ftem 32 - Pi ll r for 18" R P per aDRSD No. 2: Bid item shall include full compensation for all labor, equipment and material required to complete all work necessary to install pipe collar for 18" RCP, in accordance with San Diego Regional Standard Drawings (SDRSD) No. D-62, as shown on the Plans and as directed by the Engineer and any other related work shall be considered as included or included in the costs of other work. No additional compensation will be made.

Electrical System [Specialty Item(s)]
Bid Item 33 - Modify electrical system for t light Bid item shall include full compensation for all labor, equipment, material and coordination with utility owners, required to complete all work to modify electrical system for street lights in accordance with the Standard Specifications, the Supplementary General Provisions, the Supplementary Technical Provisions,as shown on the Plans and as directed by the Engineer and any other related work shall be considered as included or included in the costs of other work. No additional compensation will be made.
32 02/14/2023 C5 16 of 68

Traffic Signal System [Specialty Item(s)]
Bid ftem 34 - Traffic sign- i s em at the intersection-of T wnsite Dr. and N. Santa Fe Ave.). including, but not limAe-d-to.-rnast arms polesF sigLial h and in i a ' n •accessibig-Mestrian sigl3alsw luminares:Cily standard street n m ins• other fiWalpole- and signal mast arm-mounted signs: ff ecessa!y conduitsm all necessary conductors loop rielectors: pull boxes: all necessary wiring&cabling: conduit&wiring connection between the traffic signal cabinet and the traffic signal and all other work shown on the Projed Plans and in the Specifications.:

Bid item shall include full compensation for all labor, equipment and material required to complete all work necessary for all traffic signal work atTownsite Dr and N Santa Fe Ave,including all coordination with utility owners, in accordance with the Standard Specifications, the Supplementary General Provisions, the Supplementary Technical Provisions, as shown on the Plans and as directed by the Engineer and any other related work shall be considered as included or included in the costs of other work. No additional compensation will be made.

Bid Item 35 - Traffic signal syst. m at the intersection of N. Santa Fe Ave. and Nevada Ave. including. but not limited to, mast„arms: signal heads and indications: accessible pedestrian signals: iuminares: signal pole-and signal m n d i ll negessajy conduitsKll necessaty cond=ors; fo II bmeso controller cabinet and all internal components: emer enc vehicle preem tion tem• batte back-up sntern 1 necessary Wiring&cabling conduit&wiring nnection be a traffic i l cabinet and traffic signal lighting 1 ic mgter s-e-iyjcem andall other work shown on the PrQject Plans andin the Specificatons.: Bid item shall include full compensation for all labor, equipment and material required to complete all work necessary for all traffic signal work at N Santa Fe Ave and Nevada Ave, including all coordination with utility owners, in accordance with the Standard Specifications, the Supplementary General Provisions, the Supplementary Technical Provisions, as shown on the Plans and as directed by the Engineer and any other related work shall be considered as included or included in the costs of other work. No additional compensation will be made.

Bid Item 36 - Traffic signal system on N.Santa Fe Avenue approxim 520 feet south of Indian Rock Road jM1VdInL but not limitedmast arms: i I heads andin i ible nedestrian signalse luminaresm signa I I nd si gnalm rm-rn nted signsm a Iln n its:a11necessa!y condijetom loop dele-etorsp pull boxes: controller cabinet and all internal com onQnts: emergency vQhicle preemption system: battery back- up systems all necessary wiring&cabling: conduit wiring connection between the traffic signal..cabinet and the traffic i I & 1110ting electrilc meterservice; n II other work shown on the PrQject Plans andin the Specifications: Bid item shall include full compensation for all labor, equipment and material required to complete all work necessary for all traffic signal work at N Santa Fe Ave and approximately 520 feet south of Indian Rock Rd, including all coordination with utility owners, in accordance with the Standard Specifications, the Supplementary General Provisions, the Supplementary Technical Provisions, as shown on the Plans and as directed by the Engineer and any other related work shall be considered as included or included in the costs of other work. No additional compensation will be made.

Bid item 37 - !Me 11I-617 for Dual Type III-CF1 traffic signal lighting electric meter service (includinl-qkcuft breakers and ca in t and service conduit bebween electric meter service and SDG&E service point at th intersection of per thq Protect Plans and Specifications. SDG&E rgguiremenM and the SDG&E Electric Underg[ound Meter & Service Location form n i : Bid item shall include full compensation for all labor, equipment and material required to complete all work necessary for installation of electric meter service including all coordination and approvals with SDGE in accordance with the Standard Specifications, the Supplementary General Provisions, the Supplementary Technical Provisions, as shown on the Plans and as directed by the Engineer and any other related work shall be considered as included or included in the costs of other work. No additional compensation will be made.
33 02/14/2023 C5 17 of 68

Bid ttem 38 - Type III-BF for Dual Type 4-CF11 traffic signal & lighting electric meter service (including circuit breakersinet), and-s-erdee condult Detween elle=iq meter ser&e and intersection of per the Project Plans and Specifications. SDG&E requirements,. and the SDG&E Electric Underground Meter & Service„Location form Lsee Appendices]: Bid item shall include full compensation for all labor, equipment and material required to complete all work necessary for installation of electric meter service including all coordination and approvals with SDGE in accordance with the Standard Specifications, the Supplementary General Provisions, the Supplementary Technical Provisions, as shown on the Plans and as directed by the Engineer and any other related work shall be considered as included or included in the costs of other work. No additional compensation will be made.

GENERAL SURFACE IMPROVEMENTS
Bid Item 39 - Class 2 a e a e 95%com action : Bid item shall include full compensation for all labor, equipment and material required to complete all work necessary for installation of class 2 aggregate base (95% compaction) in accordance with the Standard Specifications, the Supplementary General Provisions, the Supplementary Technical Provisions,as shown on the Plans and as directed by the Engineer and any other related work shall be considered as included or included in the costs of other work. No additional compensation will be made.

Bid Item 40 - fthaft concrete pavement Bid item shall include full compensation for all labor, equipment, material, and mobilization for installation of asphalt concrete, i.e. Hot Mix Asphalt (HMA), compacted in place for slot patch in front of curb and new pavement sections. The Work shall include, but may not necessarily be limited to prime coat,tack coat, distribution,spreading, rolling,compacting,joining,adjusting(resetting)of manholes and other structures, associated and appurtenant work, in accordance with Section 302-5. of the Supplementary General Provisions, the Standard Specifications, the Supplementary Technical Provisions and as directed by the Engineer, called for in the plans and any other related work shall be considered as included or included in the costs of other work. Bid item includes work related to full depth of paving restoration required for trench repair work. No additional compensation will be made.

Bid Item 41.-fthaitconcrete payegjentfor drNewaytransitions 3"AC : Bid item shall include full compensation for all labor, equipment, material, and mobilization for installation of asphalt concrete, i.e. Hot Mix Asphalt (HMA), compacted in place for driveway replacements to transition from the back of proposed driveway entrances to existing driveway pavement. The Work shall include, but may not necessarily be limited to prime coat, tack coat, distribution, spreading, rolling, compacting, joining, adjusting (resetting) of manholes and other structures, associated and appurtenant work, in accordance with Section 302-5. of the Supplementary General Provisions, the Standard Specifications, the Supplementary Technical Provisions and as directed by the Engineer, called for in the plans and any other related work shall be considered as included or included in the costs of other work. Bid item includes work related to full depth of paving restoration required for trench repair work. No additional compensation will be made.

Bid-Item 42 - 2" Grind and Ov rla : Bid item shall include full compensation for all labor, equipment, material, and mobilization for the removal of 2-inches of existing AC pavement. The Work shall include milling, removal, hauling, disposal, and associated work, in accordance with Section 302-1 of the Supplementary General Provisions, the Standard Specifications,the Supplementary General Provisions, and as directed by the Engineer, called for in the plans and any other related work shall be considered as included or included in the costs of other work. Bid item shall include full compensation for all labor, equipment, material, and mobilization for installation of and 2-inch surface course of asphalt concrete. C2-PG 64-10 RAP, compacted in place.The final AC surface will be completed at the end of the project to provide a clean, uniform, and finished look throughout the project limits.

The Work shall include, but may not necessarily be limited to tack coat or trackless tack coat, distribution, spreading, rolling, compacting, joining, adjusting (resetting) of manholes and other structures, associated and 34 02/14/2023 C5 18 of 68

appurtenant work, in accordance with Section 302-5 of the Supplementary General Provisions, the Standard Specifications,the Supplementary General Provisions,and as directed by the Engineer,and any other related work shall be considered as included or included in the costs of other work. No additional compensation will be made.

Bid Item 43 - Type 2Quick-set Emul ion a to Sir S-1h er reenbook Subsections 203-5.("SLURRY SEAL")and 302-4,("SLURRYSEAL SURFACING."): Bid item shall include full compensation for all labor, equipment and material required to complete all work necessaryfor installation of Type 2 quick-set emulsion-aggregate slurry CQS-1h in accordance with Greenbook subsection 203-5 and 302-4, as shown on the Plans and as directed by the Engineer and any other related work shall be considered as included or included in the costs of other work.

The entire length of Townsite Drive and areas of N. Santa Fe with in the project limits shall be install slurry. No additional compensation will be made.

Bid Item 44 - 6N Type 'G' curb and gutter per SDR ❑ No. G-2 with 6w aggregate base: Bid item shall include full compensation for all labor, equipment and material required to construct 4" curb and gutter per SDRSD G-2, on minimum of 6" class 2 base under curb and gutter as directed by the Engineer, shown on the plans, according to these specifications and any other related work shall be considered as included or included in the costs of other work. No additional compensation will be made.

Bid item 45- 6"Type 'B-T median curb per SDRSD No G-6T Bid item shall include full compensation for all labor, equipment and material required to complete all work necessary for installation of 6" type B-31 median curb in accordance with SDRSD No. G-6, as shown on the Plans and as directed by the Engineer and any other related work shall be considered as included or included in the costs of other work. No additional compensation will be made.

Bi�ern_46-Type B AC Dike perSDRSD No.G-5. Bid item shall include full compensation for all labor, equipment and material required to complete all work necessary for installation of type B median curb in accordance with SDRSD No. G-5, as shown on the Plans and as directed by the Engineer and any other related work shall be considered as included or included in the costs of other work. No additional compensation will be made.

Bid ftem 47 - Type A Rollback Curb and Gutter (per Plans) with 6" aggregate base: Bid item shall include full compensation forall labor,equipment and material required to complete all work necessaryfor installation of type A rollback curb and gutter, on 6" aggregate base in accordance with the Standard Specifications, the Supplementary General Provisions, the Supplementary Technical Provisions, as shown on the Plans and as directed by the Engineer and any other related work shall be considered as included or included in the costs of other work. No additional compensation will be made.

BidJtem 48 - Type B Rollback Curb and Gutter (per Plans) with 6" aggregate base Bid item shall include full compensation for all labor, equipment and material required to complete all work necessary for installation of type B rollback curb and gutter, on 6" aggregate base in accordance with the Standard Specifications, the Supplementary General Provisions, the Supplementary Technical Provisions, as shown on the Plans and as directed by the Engineer and any other related work shall be considered as included or included in the costs of other work. No additional compensation will be made.

Bid Item 49- PCC Sidewalk ger SDRSQ No. G-7 with 6"aggregate base: Bid item shall include full compensation for all labor, equipment and material required to construct concrete sidewalk per SDRSD G-7, on 6" aggregate base as directed by the Engineer, shown on the plans, according to these specifications and any other related work shall be considered as included or included in the costs of other work. No additional compensation will be made.
35 02/14/2023 C5 19 of 68

Bid Item 50 - 6m We x 6" Thick Permeable Concr : Bid item shall include full compensation for all labor, equipment and material required to complete all work necessary for installation of 6" wide x 6" thick permeable concrete in accordance with the Standard Specifications, the Supplementary General Provisions, the Supplementary Technical Provisions,as shown on the Plans and as directed by the Engineer and any other related work shall be considered as included or included in the costs of other work. No additional compensation will be made.

Bid Item-51 - 6" Integral colored and textured/stamped PCC Median Surfacing on 6" aggregate base: Bid item shall include full compensation for all labor, equipment and material required to complete all work necessary for installation of median surfacing on 6" aggregate base in accordance with the Standard Specifications, the Supplementary General Provisions, the Supplementary Technical Provisions, as shown on the Plans and as directed by the Engineer and any other related work shall be considered as included or included in the costs of other work. No additional compensation will be made. Color and stamp approval to be determined.

Bid Item 52 - POC Cross gutter per SDRSD N -12 on i2" aggagate base: Bid item shall include full ompensation for all labor, equipment and material required to complete all work necessary for installation of PCC cross gutter in accordance with the SDRSD No. G-12 on 12" aggregate base, as shown on the Plans and as directed by the Engineer and any other related work shall be considered as included or included in the costs of other work. No additional compensation will be made.

Bid Item 53 - PCC Driveway Entrance e�,9D Nos. G-14D. G-14F, CCV SRF-05A_Qn 6" aggregate base: Bid item shall include full compensation for all labor, equipment and material required to construct concrete driveway replacements per SDRSD G-14D and G-1417, as directed by the Engineer, shown on the plans, according to these specifications and any other related work shall be considered as included or included in the costs of other work.

No additional compensation will be made.

Bid Item 54 - PIX Driveway transitions 5.5"thick on 4"aggregate base: Bid item shall include full compensation for all labor, equipment and material required to construct concrete driveway replacements to transition from the back of proposed driveways entrance to existing driveway pavement, as directed by the Engineer, shown on the plans, according to these specifications and any other related work shall be considered as included or included in the costs of other work. No additional compensation will be made.

Bid Item 55 - Type 'A' r T 'B') PQQ curb ram rarnp per SIDIRSID N -27 Qn r : Bid item shall include full compensation for all labor, equipment and material required to complete all work necessary for installation of type A or B PCC curb ramp in accordance with SDRSD No. G-27, on 6" aggregate base, and reestablish any cut irrigation lines from the work, in accordance with the Standard Specifications, the Supplementary General Provisions, the Supplementary Technical Provisions, as shown on the Plans and as directed by the Engineer and any other related work shall be considered as included or included in the costs of other work. No additional compensation will be made.

Bid Item 56 - Type V PCC curb ramp ger SDRSD No. G-29 on 6" a=9ate base: Bid item shall include full compensation for all labor,equipment and material required to complete all work necessary for installation of type A or B PCC curb ramp in accordance with SDRSD No. G-29,on 6"aggregate base,and reestablish any cut irrigation lines from the work, in accordance with the Standard Specifications, the Supplementary General Provisions, the Supplementary Technical Provisions,as shown on the Plans and as directed by the Engineer and any other related work shall be considered as included or included in the costs of other work. No additional compensation will be made.
36 02/14/2023 C5 20 of 68

Bid Item 57 - Type U PCC Curia Ramp per SDRS❑ No. G-31 on fi" aggregate base: Bid item shall include full compensation forall labor,equipment and material required to complete all work necessaryfor installation of type D PCC curb ramp per SDRSD G-31, on 6" aggregate base, in accordance with the Standard Specifications, the Supplementary General Provisions, the Supplementary Technical Provisions, as shown on the Plans and as directed by the Engineer and any other related work shall be considered as included or included in the costs of other work. No additional compensation will be made.

Bid Item 58 - Truncated er SDR D No. G-30: Bid item shall include full compensation for all labor, equipment and material required to complete all work necessary for installation of truncated domes (dark gray color) in accordance with SDRSD No. G-30, as shown on the Plans and as directed by the Engineer and any other related work shall be considered as included or included in the costs of other work. No additional compensation will be made.

Bid item shall include full compensation for all labor, equipment and material required to install geogrid fabric when unsuitable material are discovered and approved for installation, as directed by the Engineer, according to these specifications and any other related work shall be considered as included or included in the costs of other work. No additional compensation will be made. If no geogrid is installed the Contractor will not be entitled to any compensation for this bid item.

Bid - Final striping andi in : Bid item shall include full compensation for all labor, equipment and material required to install or apply new pavement striping, markings, signage, and relocate signage as directed by the Engineer, shown on the plans, according to these specifications and any other related work shall be considered as included or included in the costs of other work. No additional compensation will be made.

Bid Item 61 -- Bus Shelter with solar and LED Iightingand concrete bus shelter Dad APpendixJ flan . Bid item shall include full compensation for all labor, equipment and material required to complete all work necessary for installation of bus shelters, pads and NCTD signage in accordance with the Standard Specifications, the Supplementary General Provisions, the Supplementary Technical Provisions, as shown on the Plans and as directed by the Engineer and any other related work shall be considered as included or included in the costs of other work. The bid item shall include removal, disposal, and replacement of existing sidewalk at the bus shelter locations with 4" thick PCC on 6" aggregate base. In addition, bid item shall include full compensation for preparing, submitting, and obtaining City of Vista Building/Planning department approvals for bus shelter shop drawings including contractor's structural engineering calculation,material, equipment&color approvals,and any other related work shall be considered included. In addition, shelters must comply with Buy America provision for iron and steel materials with proper documentation. No additional compensation will be made. 37 02/14/2023 C5 21 of 68

CONTRACTOR'S LICENSING STATEMENT
TOWNSITE DRIVE COMPLETE STREETS PROJECT- CIP NO. 8312
Federal Project No.ATPL-5382(038)
The undersigned is licensed in accordance with the laws of the State of California providing for the registration of Contractors.

Contractor's License Number: 621610
Contractor's License Class: A, B, &C-12
Expiration Dale: 08/31/2024
(As described in the INSTRUCTIONS FOR SIGNING BIDS, BONDS AND CONTRACTS, complete and sign the appropriate section for your company)
Name of Contractor(Print or type.):

Signature of Contractor
Business Address:
or �.

Name of Partnership or Joint Venture Firm:

Business Address:

Signature, printed name,title and address of members signing on beha the partnership:

Signature: Name: Title:

Address:

Signature: Name: Title:

Address:
or
Name of Corporation: LC Paving& Sealing, Inc.

Business Address: 620 Alpine Way Escondido CA 92029
Corporation organized under the laws of the State of California Jose Salinas President
Sig ture of Officer of Corporation Printed Name and Title Signature of Officer of Corporation Printed Name and Title 38 02/14/2023 C5 22 of 68

PROJECT REFERENCES
TOWNSITE DRIVE COMPLETE STREETS PROJECT- CIP NO.8312
Federal Project No.ATPL-5382(038)
The Bidder shall provide evidence that the Bidder has had the prior experience to properly perform in accordance with the terms of these Plans and Project Specifications.

List ALL contracts with public agencies entered within the past five(5)years of the most recent projects for which the Bidder has completed work of similar size and complexity to this project as the General (or Prime) Contractor, and the names and phone numbers of the contracting public agencies. Make copies of this page for listing additional projects. Highlight projects with pervious concrete installation.

Project Date Completed Public Agency Name, Protect Name and Description or Contract Amount No. Contact Penton&Phone Work
Please See Attached
Sheet

2. 3.

4. 5.

6. 7.

Note: Attach a pre-printed list to this page to list additional projects. 39 02/14/2023 C5 23 of 68

A*w

REFERENCES
CITY OF ENCINITAS JOHN UGROB
505 S VULCAN AVENUE [email protected]
ENCINITAS, CA 760-633-2854
*ANNUAL CONTRACT $1,100,000.00
CITY OF RIVERSIDE FRED CERDA
3900 MAIN STREET [email protected]
RIVERSIDE, CA 951-826-5599
BID 7690 ADA FOOTPATH
$799,000.00 MAY 2020
CITY OF MENIFEE DON SHARP
29844 HAUN ROAD [email protected]
MENIFEE, CA 92586 951.723.3726

ADAMS AVENUE STREET IMPROV
$789,165.20 — MAY 2021
CITY OF VISTA JASON RIVERA
200 CIVIC CENTER DRIVE [email protected]
VISTA, CA 92084 760.643.5422
*2022 PEDESTRIAN MOBILITY
$467,949.45 — OCT 2022
02/14/2023 C5 24 of 68

CONTRACTOR'S LIST OF SUBCONTRACTORS
PROJECT NAME: TOWNSRE DRIVE COMPLETE STREETS PROJECT- CIP NO. 8312 Federal Project No.ATPL-5382(038)
NAME OF BIDDER: LC Paving & Sealing, Inc.

In accordance with Division 2, Part 1. Chanter 4 of the Public Contract Code,the prime Contractor shall submit with its Bid a list of s u bcontra ctors who will perform work in excess of one-half of one percent(0 5'A)of the prime Contractor's. total Bid or$10 000 whichever is reater.

Subcontractors listed must be properly licensed for the type of work they are to perform, and their license numbers must be indicated below. Do not list alternate subcontractors for the same work.

Name under which Ucense No. Address of OfVlce, DBE Bid Descriptlon of Dollar Value Subcontractor Is licensed and Class Mill or Shop (YmVNo) Item Subcontractor's of No(s). Portion of Work Subcontract
Pavement Recycling 569352 A 10240 San Sevaine Way No 15&42 A/C Pavement $ 145,946.76 Y g Jurupa Valley CA 91752 Removal&Cold Systems,Inc
Milling Existing
AC Pavement
Perry Electric 747931 C 10 P.O.Box 710130 No 33-38 Electrical Work, $410,000.00 Santee CA 92072 Street Lights,
Traffic Signals,
and Traffic Loops
Landmark Consulting PLS 8414 4373 Viewridge Ave No 8 $24,390.00 San Diego CA Survey Monuments
92123
WG Construction 921873 A 1017 El Cajon Blvd No 26-28 Storm Drain& $90 290.00 Suite B El Cajon CA & Facility Upgrades
92020 32
American Asphalt South 784969 A 19729 El Rivino Rd No 43 Crack Sealing& $217,421.60 Riverside CA Type II Slurry
92509 Seal
IF NO SUBCONTRACTORS ARE LISTED BIDDER MUST INITIAL ONLY ONE OF THE FOLLOWING OPTIONS:

Initial here if no subcontractor(s) will be performing Work;OR Initial here if all subcontractor(s)will be performing Work valued less than the greater of 0.5%of bid or$10,000, whichever is greater.
40 02/14/2023 C5 25 of 68

CONTRACTOR'S LIST OF SUBCONTRACTORS
PROJECT NAME: TOWNSITE DRIVE COMPLETE STREETS PROJECT- CIP NO.8312 Federal Project No.ATPL-5382(038)
NAME OF BIDDER: LC Paying& Sealing., Inc.

In accordance with Division 2 Part 1 Cha oter 4 of the Public Ccntract Code the p rime Contractor shall submit with its Bid a list_of subcontractors who will perform work in excess of one-half of one percent(0 5%1 of the. rs� ime Contractor's. total Bid or$10,000. whichever is greater.

Subcontractors listed must be properly licensed for the type of work they are to perform, and their license numbers must be indicated below. Do not list alternate subcontractors for the same work.

Name under which License No. Address of Office, DBE Bid Description of Dollar Value Subcontractor Is Ncensed and Class MIII or Shop (Yu/No) Item Subcontractor's of NoW. Portion of Work Subcontract
f7A10w`0EI y (,G�7/o 20-22 'Traffic Signs,ZS6 ;� 1 5Aa D la50 e,4 & Striping&
Ci'3 Z 21 G 60 Pavement Marking
0 IF NO SUBCONTRACTORS ARE LISTED, BIDDER MUST INITIAL ONLY ONE OF THE FOLLOWING OPTIONS:

Initial here if no subcontractor(s) will be performing Work;OR Initial here if all subcontractor(s)will be performing Work valued less than the greater of 0.5%of bid or$10,000, whichever is greater.
40 02/14/2023 C5 26 of 68

CERTIFICATION REGARDING DEBARMENT,SUSPENSION, PROPOSED DEBARMENT,AND OTHER

RESPONSIBILITY MATTERS
48 CFR 52.209-5
TOWNSITE DRIVE COMPLETE STREETS PROJECT- CIP NO. 8312
Federal Project No. ATPL-5382 (038)
Bidders: please read all information, complete checkboxes 1 A through 1 F and sign the form.

1. The Bidder certifies,to the best of its knowledge and belief,that the Bidder and/or any of its Principals, and/or any of its prospective subcontractors for this award:
(A) Are ❑ Are not presently debarred, suspended, proposed for debarment, or declared ineligible for the award of contracts by any Federal,State or local agency; (B) Have ❑ have not ®, within a three-year period preceding this offer, been convicted of or had a civil judgment rendered against them for: commission of fraud or a criminal offense in connection with obtaining, attempting to obtain, or performing a public (Federal, State, or local) contract or subcontract; violation of Federal or State antitrust statutes relating to the submission of offers; or commission of embezzlement,theft,forgery, bribery,falsification or destruction of records, making false statements,tax evasion, violating Federal, State or local criminal tax laws, or receiving stolen property (if Bidder checks "have",the Bidder shall also see 52.209-7, if included in this solicitation); (C) Are ❑ are not X presently indicted for, or otherwise criminally or civilly charged by a governmental entity with, commission of any of the offenses enumerated in subdivision (B)of this provision; (D) Have ❑ have not ry�, within a three-year period preceding this offer, been notified of any delinquent Federal, State or local taxes in an amount that exceeds$3,000 for which the liability remains unsatisfied (E) Have ❑ have not �within a 3-year period precedingthis offer, had one or more contracts terminated for default by any Federal,State or local agency;and
(F) Have ❑ does not have 1�an Active Exclusion on the System for Award Management (SAM), which is available at https://sam.go� 1.

2. The Bidder shall provide immediate written notice to the Contracting Officer if, at any time prior to contract award,the Bidder learns that its certification was erroneous when submitted or has become erroneous by reason of changed circumstances.

3. The certifications of this provision above are material representation of fact upon which reliance was placed when making award. If it is later determined that the Bidder knowingly rendered an erroneous certification, in addition to other remedies available to the Government,the Contracting Officer may terminate the contract resulting from this solicitation for default.

4. Where the Bidder is unable to certify to any of the statements in this certification, such prospective participant shall attach an explanation to this certification form.

Company Name: LC Paving& Sealing, Inc. Date:

Name: Jose Salinas Signature:
(President or Authorized OfficialofConsultant)
Guidance:

A. Bidder's (or its subcontractors') inability to certify to the items in paragraph (1)(B), (1)(C), (1)(D), and (1)I will not necessarily result in withholding of an award.However,this certification will be considered in connection with a determination of the Bidder's responsibility. Failure of the Bidder to furnish a certification or provide 41 02/14/2023 C5 27 of 68

such additional information as required in paragraph(4)above or as requested by the Contra ctingOfficer may render the Bidder nonresponsible.

B. Nothing contained in the foregoing shall be construed to require establishment of a system of records in order to render, in good faith,the certification required by paragraph (1) of this provision. The knowledge and information of an Bidder is not required to exceed that which is normally possessed by a prudent person in the ordinary course of business dealings.

C. Principal, for the purposes of this certification, means an officer, director, owner, partner, or a person having primary management or supervisory responsibilities within a business entity(e.g., general manager; plant manager; head of a division or business segment; and similar positions).

D. Federal taxes are considered delinquent if both of the following criteria apply:

1. The tax liability is finally determined. The liability is finally determined if it has been assessed.A liability is not finally determined if there is a pending administrative or judicial challenge. In the case of a judicial challenge to the liability, the liability is not finally determined until all judicial appeal rights have been exhausted.

2. The taxpayer is delinquent in making payment.A taxpayer is delinquent if the taxpayer has failed to pay the tax liability when full payment was due and required.A taxpayer is not delinquent in cases where enforced collection action is precluded.

3. Examples:
i) The taxpayer has received a statutory notice of deficiency, under I.R.C. § 6212, which entitles the taxpayer to seek Tax Court review of a proposed tax deficiency.This is not a delinquent tax because it is not a final tax liability. Should the taxpayer seek Tax Court review,this will not be a final tax liability until the taxpayer has exercised all judicial appeal rights. ii) The IRS has filed a notice of Federal tax lien with respect to an assessed tax liability, and the taxpayer has been issued a notice under I.R.C. § 6320 entitling the taxpayer to request a hearing with the IRS Office of Appeals contesting the lien filing, and to further appeal to the Tax Court if the IRS determines to sustain the lien filing. In the course of the hearing,the taxpayer is entitled to contest the underlying tax liability because the taxpayer has had no prior opportunity to contest the liability. This is not a delinquent tax because it is not a final tax liability. Should the taxpayer seek tax court review, this will not be a final tax liability until the taxpayer has exercised all judicial appeal rights.
iii) The taxpayer has entered into an installment agreement pursuant to I.R.C. § 6159. The taxpayer is making timely payments and is in full compliance with the agreement terms.The taxpayer is not delinquent because the taxpayer is not currently required to make full payment. iv) The taxpayer has filed for bankruptcy protection. The taxpayer is not delinquent because enforced collection action is stayed under 11 U.S.C. 362 (the Bankruptcy Code). 42 02/14/2023 C5 28 of 68

Approved by OMB
0348-0046

DISCLOSURE OF LOBBYING ACTIVITIES
TOWNSITE DRIVE COMPLETE STREETS PROJECT- CIP NO.8312
Federal Project No.ATPL-5382(038)
Complete this form to disclose lobbying activities pursuant to 31 U.S.C. 1352 (See reverse for public burden disclosure)

1. Type of Federal Action: 2. Status of Federal Action: 3. Report Type:
1861. contract 1861. bid/offer/applicatio 1861. initial filing b.grant n b. material change
c. cooperative agreement b. initial award
d. loan c. post-award For material change only:
e. loan guarantee Year quarter
f. loan insurance Date of last report

4. Name and Address of Reporting Entity: 5. If Reporting Entity in No.4 is Subawardee, Prime Subawardee Enter Name and Address of Prime:

Tier , if Known:

Congressional Districts if known: Congressional Distri4 if known:

6. Federal Department/Agency: 7. Federal Program Name/Description:

CFDA Number, if applicable:

S. Federal Action Number,if known. 9. Award Amount, if known:
1861. a.Name and Address of Lobbying b. Individuals Performing Services(including address if Registrant different from No. 10a)
(if individual, last name, first name, MI): (last name, first name, MI):

11. Information requested through this form Is authorized by title 31 U.S.C.section 1352. This disclosure of lobbying Signature:
activities is a material representation of fact upon which reliance was placed by the tier above when this transaction Print Name:
was made or entered into.This disclosure Is required pursuant to 31 U.S.C.1352.This information will be reported to the Title:

Congress semi-annually and will be available for public inspection.Any person who fails to file the required disclosure Telephone No.: Date:
shall be subject to a civil penalty of not less than$10,000 and not more than$100,000 for each such failure.

Federal Use Only Authorized for Local Reproduction Standard Form-LLL(Rev.7-97)
43 02/14/2023 C5 29 of 68

INSTRUCTIONS FOR COMPLETION OF SF-LLL, DISCLOSURE OF LOBBYING ACTIVITIES This disclosure form shall be completed by the reporting entity, whether subawardee or prime Federal recipient, at the initiation or receipt of a covered Federal action, or a material change to a previous filing, pursuant to title 31 U.S.C. section 1352. The filing of a form is required for each payment or agreement to make payment to any lobbying entity for influencing or attempting to influence an officer or employee of any agency, a Member of Congress, an officer or employee of Congress, or an employee of a Member of Congress in connection with a covered Federal action. Complete all items that apply for both the initial filing and material change report. Refer to the implementing guidance published by the Office of Management and Budget for additional information.

1. Identify the type of covered Federal action for which lobbying activity is and/or has been secured to influence the outcome of a covered Federal action.

2. Identify the status of the covered Federal action.

3. Identify the appropriate classification of this report. If this is a followup report caused by a material change to the information previously reported, enter the year and quarter in which the change occurred. Enter the date of the last previously submitted report by this reporting entity for this covered Federal action.

4. Enter the full name, address, city, State and zip code of the reporting entity. Include Congressional District, if known. Check the appropriate classification of the reporting entity that designates if it is, or expects to be, a prime or subaward recipient. Identify the tier of the subawardee, e.g.,the first subawardee of the prime is the 1st tier. Subawards include but are not limited to subcontracts, subgrants and contract awards under grants.

5. If the organization filing the report in item 4 checks "Subawardee,"then enter the full name, address, city, State and zip code of the prime Federal recipient. Include Congressional District, if known.

6. Enter the name of the federal agency making the award or loan commitment. Include at least one organizational level below agency name, if known. For example, Department of Transportation, United States Coast Guard.

7. Enter the Federal program name or description for the covered Federal action (item 1). If known, enter the full Catalog of Federal Domestic Assistance (CFDA) number for grants, cooperative agreements, loans, and loan commitments.

8. Enter the most appropriate Federal identifying number available for the Federal action identified in item 1 (e.g., Request for Proposal (RFP) number; Invitations for Bid (IFB) number; grant announcement number;the contract, grant, or loan award number;the application/proposal control number assigned by the Federal agency). Included prefixes, e.g., "RFP-DE-90-001."

9. For a covered Federal action where there has been an award or loan commitment bythe Federal agency, enter the Federal amount of the award/loan commitment for the prime entity identified in item 4or5.

10. (a) Enter the full name, address, city, State and zip code of the lobbying registrant under the Lobbying Disclosure Act of 1995 engaged by the reporting entity identified in item 4 to influence the covered Federal action.
(b) Enter the full names of the individual(s) performing services,and include full address if different from 10(a). Enter Last Name, First Name, and Middle Initial (MI).

11. The certifying official shall sign and date the form, print his/her name, title, and telephone number.

According to the Paperwork Reduction Act,as amended, no persons are required to respond to a collection of information unless it displays a valid OMB control Number. The valid OMB control number forthis information collection is OMB No.0348-0046. Public reporting burden for this collection of information is estimated to average 10 minutes per response, including time for reviewing instructions,searching existing data sources,gathering and maintainingthe data needed,and completing and reviewingthe collection of information. Send comments regardingthe burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden,to the Office of Management and Budget, Paperwork Reduction Project(0348- 0046),Washington, DC 20503
44 02/14/2023 C5 30 of 68

NON-LOBBYING CERTIFICATION FOR FEDERAL-AID CONTRACTS
(Byrd Anti-Lobbying Amendment Compliance&Certification) TOWNSITE DRIVE COMPLETE STREETS PROJECT- CIP NO. 8312
Federal Project No.ATPL-5382(038)
For all contracts above the limit prescribed in FAR Section 52.203-12(g), or its successor regulation (currently $100,000),the Bidder must complete and sign the following:

The following certification and disclosure regarding payments to influence certain federal transactions are made per the provisions contained in FAR 52.203-11 and 52.203-12 and 31 U.S.C. 1352,the "Byrd Anti- Lobbying Amendment."
(a) FAR 52.203-12, "Limitation on Payments to Influence Certain Federal Transactions" is hereby incorporated by reference into this certification.
(b) The prospective Bidder certifies, by signing and submitting this bid or proposal,to the best of his or her knowledge and belief,that:

1. No Federal appropriated funds have been paid or will be paid, by or on behalf of the undersigned, to any person for influencing or attempting to influence an officer or employee of any Federal agency, a Member of Congress, an officer or employee of Congress, or an employee of a Member of Congress in connection with the awarding of any Federal contract,the making of any Federal grant,the making of any Federal loan,the entering into of any cooperative agreement, and the extension, continuation, renewal, amendment, or modification of any Federal contract, grant, loan, or cooperative agreement.

2. If any funds other than Federal appropriated funds have been paid or will be paid to any person for influencing or attempting to influence an officer or employee of any Federal agency, a Member of Congress, an officer or employee of Congress, or an employee of a Member of Congress in connection with this Federal contract,grant, loan, or cooperative agreement,the undersigned shall complete and submit Standard Form-LLL, "Disclosure of Lobbying Activities," in conformance with its instructions.

3. He or she will include the language of this certification in all subcontract awards at any tier and require that all recipients of subcontract awards in excess of$100,000 shall certify and disclose accordingly.
(c) This certification is a material representation of fact upon which reliance was placed when this transaction was made or entered into. Submission of this certification is a prerequisite for making or entering into this transaction imposed by Section 1352, Title 31, U.S. Code. Any person who fails to file the required certification shall be subject to a civil penalty of not less than $10,000 and not more than $100,000 for each such failure.
45 02/14/2023 C5 31 of 68

EQUAL EMPLOYMENT OPPORTUNITY CERTIFICATION
Executive Order 11246
TOWNSITE DRIVE COMPLETE STREETS PROJECT- CIP NO. 83.2
Federal Project No.ATPL-5382(038)
This certification is required by the Equal Employment Opportunity Regulations of the Secretary of Labor (41 CFR 60-1.7(b) (1)) and must be submitted by bidders and proposed subcontractors only in connection with contracts and subcontracts which are subject to the equal opportunity clause. Contracts and subcontracts which are exempt from the equal opportunity clause are set forth in 41 CFR 60-1.5. (Generally only contracts or subcontracts of$10,000 or under are exempt).

The Prime Contractor and Proposed Subcontractors shall each complete and sign a separate certification form.

1. Bidder/ proposed subcontractor has participated in a previous contract or subcontract subject to the Equal Opportunity Clauses, as required by Executive Orders 10925, 11114, 11246, or 11375. r .

YES, If yes, identify the most recentcontract: r T
❑ NO

2. Compliance reports were required to be filed in connection with such contract or subcontract. r
3 YES, If yes, identify the most recent contract: rt r Lt3{q'e'� ❑ NO

3. Bidder/ proposed subcontractor has filed all compliance reports due under applicable instructions.

Il YES
❑ NO

4. Have you ever been or are you being considered for sanction due to violation of Executive Order 11246,as amended?
❑ YES
Ll NO
Proposed prime contractors and subcontractors who have participated in a previous contract or subcontract subject to the Executive Orders and have not filed the required reports should note that 41 CFR 60-1.7(b) (1) prevents the award of contracts and subcontracts unless such contractor submits a report covering the delinquent period or such other period specified by the Federal Highway Administration or by the Director, Office of Federal Contract Compliance, U.S. Department of Labor. (Continued on next page)
46 02/14/2023 C5 32 of 68

EQUAL EMPLOYMENT OPPORTUNITY CERTIFICATION
Executive Order 11246
TOWNSITE DRIVE COMPLETE STREETS PROJECT- CIP NO.8312
Federal Project No.ATPL-5382(038)
(Continued)
Signing this Proposal on the signature portion thereof shall also constitute signature of this Certification.

LC Paving& Scaling, Inc.

Company
President
Si a ure Title Date
Signature Title Date
47 02/14/2023 C5 33 of 68

NON SEGREGATED FACILITIES CERTIFICATION EXECUTIVE ORDER 11246 (30 F.R. 12319-25)
TOWNSITE DRIVE COMPLETE STREETS PROJECT- CIP NO.8312
Federal Project No.ATPL-5382(038)
This certification is required pursuant to Executive Order 11246 (30 F.R. 12319-25). The bidder's attention is called to the clause entitled Equal Employment Opportunity of the General Conditions of the Contract for Construction.
"Segregated facilities," as used in this provision, means any waiting rooms, work areas, rest rooms and wash rooms, restaurants and other eating areas,time clocks, locker rooms and other storage or dressing areas, parking lots, drinking fountains, recreation or entertainment areas, transportation, and housing facilities provided for employees,that are segregated by explicit directive or are in fact segregated on the basis of race, color, religion, or national origin because of habit, local custom, or otherwise.

By the submission of this bid, the bidder certifies that it does not and will not maintain or provide for its employees any segregated facilities at any of its establishments, and that it does not and will not permit its employees to perform their services at any location under its control where segregated facilities are maintained. The bidder agrees that a breach of this certification isa violation of the Equal Employment Opportunity clause in the contract.

The bidder further agrees that (except where it has obtained identical certifications from proposed subcontractors for specific time periods) prior to entering into subcontracts which exceed $10,000 and are not exempt from the requirements of the Equal Employment Opportunity clause, it will obtain identical certifications from the proposed subcontractors; retain the certifications in its files; and forward the following notice to the proposed subcontractors (except if the proposed subcontractors have submitted identical certifications for specifictime periods):

ProspectiveNotice to n for ifi Non-
segregated Facilities
A Certification of Non-segregated Facilities must be submitted before the award of a subcontract exceeding$10,000 which is not exempt from the provisions of the Equal Employment Opportunity clause of the prime contract. The certification may be submitted either for each subcontract or for all subcontracts during a period (i.e., quarterly, semiannually, or annually).

I, hereby certify that all the information stated herein, as well as any information provided in the accompaniment herewith, is true and accurate.

Company: LC Paving& Sealing. Inc.

President
Si u re Title Date
Signature Title Date
48 02/14/2023 C5 34 of 68

NON-COLLUSION DECLARATION
TOWNSIITE DRIVE COMPLETE STREETS PROJECT- CIP NO. 8312
Federal Project No.ATPL-5382(038)
The undersigned declares:

I am the President of LC Pavinia& Scaling, Inc. ,the party making the foregoing bid. (Title) (Company Name)
The bid is not made in the interest of, or on behalf of, any undisclosed person, partnership, company, association, organization, or corporation. The bid is genuine and not collusive or sham. The bidder has not directly or indirectly induced or solicited any other bidder to put in a false or sham bid. The bidder has not directly or indirectly colluded, conspired, connived, or agreed with any bidder or anyone else to put in a sham bid, or to refrain from bidding. The bidder has not in any manner, directly or indirectly, sought by agreement, communication, or conference with anyone to fix the bid price of the bidder or any other bidder, or to fix any overhead, profit, or cost element of the bid price, or of that of any other bidder. All statements contained in the bid are true. The bidder has not, directly or indirectly, submitted his or her bid price or any breakdown thereof, or the contents thereof, or divulged information or data relative thereto, to any corporation, partnership, company, association, organization, bid depository, or to any member or agent thereof, to effectuate a collusive or sham bid, and has not paid, and will not pay, any person or entity for such purpose.

Any person executing this declaration on behalf of a bidder that is a corporation, partnership,joint venture, limited liability company, limited liability partnership, or any other entity, hereby represents that he or she has full power to execute, and does execute,this declaration on behalf of the bidder. declare under penalty of perjury under the laws of the State of California that the foregoing is true and correct and that this declaration is executed on .

LJS Of Lh� , at nfi(6�t)o
(Date) City)- (State)
Si ure
se Salinas
'Printed Name
President
Title
49 02/14/2023 C5 35 of 68

PUBLIC CONTRACT CODE QUESTIONNAIRE AND STATEMENTS
TOWNSITE DRIVE COMPLETE STREETS PROJECT- CIP NO.8312
Federal Project No.ATPL-5382(038)

TO BE EXECUTED BY BIDDER AND SUBMITTED WITH BID
Public Contract Code Section 10285.1 Statement
In conformance with Public Contract Code Section 10285.1 (Chapter 376, Stats. 1985), the bidder hereby declares under penalty of perjury under the laws of the State of California that the bidder ❑has been
Was not been
convicted within the preceding three years of any offenses referred to in that section, including any charge of fraud, bribery, collusion, conspiracy, or any other act in violation of any state or Federal antitrust law in connection with the bidding upon, award of, or performance of,any public works contract,as defined in Public Contract Code Section 1101,with any public entity,as defined in Public Contract Code Section 1100, including the Regents of the University of California or the Trustees of the California State University. The term "bidder" is understood to include any partner, member, officer, director, responsible managing officer, or responsible managing employee thereof, as referred to in Section 10285.1.

Note: The bidder must place a checkmark after "has" or "has not" in one of the blank spaces provided. The above Statement is part of the Proposal. Signing this Proposal on the signature portion thereof shall also constitute signature of this Statement. Bidders are cautioned that making a false certification may subject the certifier to criminal prosecution.

Public Contract Code Section 10162 Questionnaire
In conformance with Public Contract Code Section 10162,the Bidder shall complete, under penalty of perjury, the following questionnaire:

Has the bidder, any officer of the bidder, or any employee of the bidder who has a proprietary interest in the bidder, ever been disqualified, removed, or otherwise prevented from bidding on, or completing a federal, state, or local government project because of a violation of law or a safety regulation? ❑ Yes 1XNo
If the answer is yes, explain the circumstances in the following space 50 02/14/2023 C5 36 of 68

CONTRACTOR'S CERTIFICATION ON FEDERAL REQUIREMENTS
TOWNSITE DRIVE COMPLETE STREETS PROJECT- CIP NO. 83J2
Federal Project No.ATPL-5382(038)
1 hereby certify that I have reviewed the Federal requirements for Coronavirus Local Fiscal Recovery Fund in the INSTRUCTIONS TO BIDDERS section of these Specifications and in Appendix B to these Specifications and fully understand all my obligations if the Project is awarded to me.

Project Name: Townsite Dr Complete Streets Project
Location: City of Vista
Amount of Bid: $ �
LC Paving& Scaling, Inc.

Name of Bidder
Jose Salinas. President
Print Name and Title
620 Alpine Way
Street Address
Escondido CA 92029
City, State Zip Code
t--t/
Sign ur
51 02/14/2023 C5 37 of 68

BID SECURffY FORM r �
(For Cash or Checks)
Note: This form is to be used when the Bidder chooses to submit cash or a check instead of a bid bond as bid security. Cash or a cashier's or certified check in the amount of not less than ten percent(109/6) of the total Base Bid must accompany the bid.

KNOW ALL PERSONS BY THESE PRESENTS that:

WHEREAS the City of Vista ("Agency") has issued an invitation for bids for the work described as follows:

Work Description.

WHEREAS
(Name, address, and telephone number of Bidder)
the undersigned bidder("Bidder"), has submitted the accompanying bid to Agency for the work.

WHEREAS, bidders are required under the provisions of the Vista Municipal Code to furnish a form of bidder's security with their bid.

NOW, THEREFORE, the undersigned Bidder, is held and firmly bound unto Agency in the penal sum not less than ten percent(10%)of the total base bid amount, in lawful money of the United States of America in the form of*Cash, *a Certified Check, *a Cashier's Check (* Strike out the inapplicable words) for the payment of which sum we bind ourselves, our heirs, executors, administrators, successors, and assigns, jointly and severally, firmly by these presents.

THE CONDITION OF THIS OBLIGATION IS SUCH THAT, if the Bidder shall not withdraw said bid within the period specified in the bidding specification, or, if no period be specified, for ninety (90) calendar days after the bid opening; or if the Bidder does not attempt to withdraw the bid when the requirements of Public Contract Code§5101 et seq. are not met; or if the Bidder is awarded a contract for the work by Agency and, within the time and in the manner required by the bidding specification , or if no period be specified, within ten (10) working days after the Contract is awarded, enters into the written form of contract included with bidding specification, furnishes the required bonds, one to guarantee faithful performance and the other to guarantee payment for labor and materials, and furnishes the required insurance coverages, then this obligation shall become null and void and the cash or check shall be returned to Bidder; otherwise, the proceeds of the cash or check shall become the property of the Agency and the Bidder shall have no further interest therein. (Text and signatures continued on page 2)
Townsite Drive Complete Streets Project - CIP No.8312
Federal Project No.ATPL-5382 (038)
Bid Security Form Page 1
52 02/14/2023 C5 38 of 68

In case suit is brought against the Bidder based on this obligation, Bidder further agrees to pay all court costs incurred by Agency in the suit and reasonable attorneys' fees in an amount fixed by the court.

IN WITNESS WHEREOF, this instrument has been duly executed by Bidder on the date set forth below, the name of each corporate officer being hereto affixed, and these presents duly signed by its undersigned representative(s) pursuant to authority of its governing body.

Dated:

Bidder
By:

Its
By:

Its
(Seal)
This form must be dated,all signatures must be notarized, and evidence of the authority of any person signing as attomey-in-fact must be attached.

Townsite Drive Complete Streets Project - CIP No. 8312
Federal Project No.ATPL-5382 (038)
Bid Security Form Page 2
53 02/14/2023 C5 39 of 68

Bond No, CMGB00015571

BID BOND
KNOW ALL PERSONS BY THESE PRESENTS that:

The City of Vista ("City")has issued an invitation for bids for the work described as follows,- Work Description.

Townsite Drive Complete Streets Project CIP NO.8312 Federal Project No.ATPL-5382(038) LC Paving&Sealing,Inc.620 Alpine Way,Escondido,CA 92029(760)752-1674 (Name,address,and telephone number of Bidder)
the undersigned bidder("Principal'), has submitted the accompanying bid to City for the work.

Bidders are required under the provisions of the Contract to furnish a form of bidder's security with their bid.

NOW,THEREFORE,we, the undersigned Principal, and
Argonaut Insurance Company,c/o CMGIA,20335 Ventura Blvd.,Ste 426,Woodland Hills,CA 91364(866)363-2642 (Name,address,and telephone number of Surety)
("Surety") a duly admitted surety insurer under the laws of the State of California, as Surety, are held and firmly bound unto City in the penal sum not less than ten percent(10%)of the total base bid amount, in lawful money of the United States of America, for the payment of which sum well and truly to be made,we bind ourselves, our heirs, executors, administrators, successors, and assigns,jointly and severally, firmly by these presents.

THE CONDITION OF THIS OBLIGATION IS SUCH THAT, if the hereby bounded Principal shall not withdraw said bid within the period specified in the bidding specification, or, if no period be specified, for ninety (90) calendar days after the bid opening; or if the Principal does not attempt to withdraw the bid when the requirements of Public Contract Code §5101 et seq. are not met; or if the Principal is awarded a contract for the work by City and, within the time and in the manner required by the bidding specification,or if no period be specified,within ten(10)working days after the Contract is awarded, enters into the written form of contract included with bidding specification, furnishes the required bonds, one to guarantee faithful performance and the other to guarantee payment for labor and materials, and furnishes the required insurance coverages, then this obligation shall become null and void; otherwise, it shall be and remain in full force and effect.

In case suit is brought upon this bond, Surety further agrees to pay all court costs incurred by City in the suit and reasonable attorneys'fees in an amount fixed by the court.

Surety, for value received, hereby stipulates and agrees that no change, extension of time for award of a contract after opening of bids, alteration, addition, modification, or supplement to the terms of the bidding documents, the work to be performed thereunder,or the Contract Documents shall in any way affect Surety's obligations under this Bond, and Surety does hereby waive notice of any such change,extension of time, alteration, addition, modification or supplement to the terms of said Bidding Documents, the Work to be performed thereunder, or the Contract Documents. Surety hereby waives the provisions of California Civil Code §§2819, 2845, and 2849. City is an intended beneficiary of this bond and has all rights of a party thereto. (Text and signatures continued on page 2)
Townsite Drive Complete Streets Project- CIP No.8312
Federal Project No.ATPL-5382(038)
Bid Bond Page 1
54 02/14/2023 C5 40 of 68

IN WITNESS WHEREOF, this instrument has been duly executed by Principal and Surety, on the date set forth below, the name of each corporate party being hereto affixed, and these presents duly signed by its undersigned representative(s) pursuant to authority of its governing body.

Dated: January 13,2022
"Principal" "'Surety"
LC Paving&Sealing,Inc. Argonaut Insurance Company r
By: g
S' ure 5i tur
_ �QT n i a Craciy, tto v -Fuc
Name and Title Name and Tit
By: By:

Signature Sig nature
Name Name
(Seal) (Seal)
This bond must be dated,all signatures must be notarized,and evidence of the authority of any person signing as attomey-in-fact must be attached.

Townsite Drive Complete Streets Project- CIP No.8312
Federal Project No.ATPL-5382(038)
Bid Bond Page 2
55 02/14/2023 C5 41 of 68

ACKNOWLEDGMENT
A notary public or other officer completing this
certificate verifies only the identity of the individual who signed the document to which this certificate is
attached, and not the truthfulness, accuracy, or
validity of that document.

State of California
County of San Diego
On -J before me, Marisa Haas, Notary Public (insert name and title of the officer)
personally appeared Jose A. Salinas
who proved to me on the basis of satisfactory evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument.

I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct.

WITNESS my h n Cicial . �4 MARISAANN NAAS Notary Public-California ,
L San Diaav County
Commission N 2306119
''�►�y Comm,Explras Sap 24,2023
Signature v�'1. (Seal)
02/14/2023 C5 42 of 68

Bond No.: CMGB00015571
Argonaut Insurance Company
Deliveries Only: 225 W. Washington, 24th Floor
Chicago, IL 60606
United States Postal Service: P.O. Box 469011, San Antonio, TX 78246

POWER OF ATTORNEY
KNOW ALL MEN BY THESE PRESENTS: That the Argonaut Insurance Company,a Corporation duly organized and existing under the laws of the State of Illinois and having its principal office in the County of Cook,Illinois does hereby nominate,constitute and appoint:

Gabriella Grad' Sh3it)Lee Lossno.Sw hanic Hn a Shear.Elizabeth Santos Slacc•Garcia Mal tthew D iordsi C hristoolier Coroncl Their hare and lawful agent(s)and attomey(s)-in-fact,each in their separate capacity if more than one is named af���ipv�����vc'''. to make,execute,seal and deliver for and on its behalf as surety,and as its act and deed any and all bonds,contracts,agreements of indemnity an�dlot dertakings in suretyship provided, however,that the penal sum of any one such instrument executed hereunder shall not exceed the sum of:
+tirR
This Power of Attorney is granted and is signed and sealed under and by the authority of the following Resolution adopted by the Board of Directors of Argonaut Insurance Company:
"RESOLVED,That the President,Senior Vice President,Vice President,Assistant Vick l eNdent, ecretary,Treasurer and each of them hereby is authorized to execute powers of attomey,and such authority can be executed by use of facsim�ignature,which may be attested or acknowledged by arty officer or attorney,of the Company,qualifying the attorney or attorneys named in the given1power of attorney,to execute in behalf of,and acknowledue as the act and deed of the Argonaut Insurance Company,all bond undertakings and contracts of suretyship,and to affix the corporate seal thereto." IN WITNESS WHEREOF,Argonaut Insurance Company has caused its-official seal to be hereunto affixed and these presents to be signed by its duly authorized officer on the 19th day of November,2021, _ Argonaut Insurance Company SEAL: by:
••.[L1NOIf'.•' T.

STATE OF TEXAS Gary E.Grose President
COUNTY OF HARRIS SS:

On this 19th day of November,2021 A.D.,before me,a Notary Public of the State of Texas,in and for the County of Harris,duly commissioned and qualified,came THE ABOVE OFFICER OF THE COMPANY,to me personally known to be the individual and officer described in,and who executed the preceding instrument,and he acknowledged the execution of same,and being by me duly swam,deposed and said that he is the officer of the said Company aforesaid,and that the seal affixed to the preceding instrument is the Corporate Seal of said Company,and the said Corporate Seal and his signature as officer were duly affixed and subscribed to the said instrument by the authority and direction of the said corporation,and that Resolution adopted by the Board of Directors of said Company,referred to in the preceding instrument is now in force- IN TESTIMONY WHEREOF,I have hereunto set my hand,and affixed my Official Seal at the County of Harris,the day and year first above written tltL. ,, rn, YY-.uJtn
�, KnTHLEEN M MFF_KS
NOTARY PU6LIG
��' STA-E OF EXAS
Ml'f'OhAM EXF'(]7;7 125
NOTARY ID 55�902-5 (NotarvPublic)
1,the undersigned Officer of the Argonaut Insurance Company,Illinois Corporation,do hereby certify that the original POWER OF ATTORNEY of which the foregoing is a full,true and correct copy is still in full force and effect and has not been revoked.

IN WITNESS WHEREOF,I have hereunto set my hand,and affixed the Seal of said Company,on the 13th day of January 2023.

SEAL:a; ---
:: � r949 2C
Austin W.King Secretary
IF YOU HAVE QUESTIONS ON AUTHENTICITY OF THIS DOCUMENT CALL(833)820-9137- 02/14/2023 C5 43 of 68

CALIFORNIA ALL-PURPOSE ACKNOWLEDGMENT CIVIL CODE§ 1189 A notary public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached,and not the truthfulness,accuracy,or validity of that document.

State of California j
County of Los Angeles }
On JAN 13 2023 before me, Lucas Patterson, Notary Public Date Here Insert Name and Title of the Officer
personally appeared Gabriella Gradv
Name(s)of Signer(s)
who proved to me on the basis of satisfactory evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their signature(s)on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument. certify under PENALTY OF PERJURY under the laws
of the State of California that the foregoing paragraph is true and correct.

WITNESS my hand and official seal.
*my
LUCAS PAMRSONNotary Public.CaliforniaSignature
Los Angeles CountyCommission#2352264 Signature of Notary Public Comm.Expires Mar 19,2025
Place Notary Seal Above

OPTIONAL
Though this section is optional, completing this information can deter alteration of the docum or fraudulent reattachment of this form to an unintended document.

Description of Attached Document
Title or Type of Document: Docum ate:

Number of Pages: Signer(s) Other Than Named Abo
Capacity(ies) Claimed by Signer(s)
Signer's Name: Signer's Name:
❑Corporate Officer — Title(s): ❑ Corporate Officer — Title(s):
❑Partner — ❑ Limited ❑Gener [I Partner — El Limited ❑General El Individual ElAttorne ' act ❑ Individual ❑Attorney in Fact ❑Trustee ❑ !an or Conservator ❑Trustee ❑Guardian or Conservator ❑Other: ❑ Other:

Signer Is resenting: Signer Is Representing:
02014 National Notary Association • www.NationaiNotary.org • 1-800-US NOTARY(1-800-876-6827) Item#5907 02/14/2023 C5 44 of 68

CONTRACTOR'S CERTIFICATE
TOWNSITE DRIVE COMPLETE STREETS PROJECT- CIP NO. 8312
Federal Project No.ATPL-5382(038)

CONTRACTOR'S CERTIFICATE PURSUANT TO
SECTION 1861 OF THE LABOR CODE
I am aware of the provisions of Section 3700 of the Labor Code that requires every employer to be insured against liability for Worker's Compensation or to undertake self-insurance in accordance with the provisions of that Code, and I will comply with such provisions before commencing the performance of the Work of this Contract.

LC Paving& Sealing. Inc.

Name of Co for
By:

Si Lure
Jo ' alinas
P ted Name
President
Title,J
� )(p V�
Date
By:

Signature
Printed Name
Title
Date
64 02/14/2023 C5 45 of 68

NON-COLLUSION DECLARATION FOR SUBCONTRACTORS
TOWNSITE DRIVE COMPLETE STREETS PROJECT- CIP NO. 8312
Federal Project No.ATPL-5382 (038)

TO BE EXECUTED BY EACH AWARDEE OF A SUBCONTRACT
The undersigned declares:

Chief Operations Officer Pavement Recycling Systems, Inc. am the of the party making the foregoing bid. (Title) (Company Name)
The bid is not made in the interest of, or on behalf of, any undisclosed person, partnership, company, association, organization, or corporation. The bid is genuine and not collusive or sham. The bidder has not directly or indirectly induced or solicited any other bidder to put in a false or sham bid. The bidder has not directly or indirectly colluded, conspired, connived, or agreed with any bidder or anyone else to put in a sham bid, or to refrain from bidding. The bidder has not in any manner, directly or indirectly, sought by agreement, communication, or conference with anyone to fix the bid price of the bidder or any other bidder, or to fix any overhead, profit, or cost element of the bid price, or of that of any other bidder. All statements contained in the bid are true. The bidder has not, directly or indirectly, submitted his or her bid price or any breakdown thereof, or the contents thereof, or divulged information or data relative thereto, to any corporation, partnership, company, association, organization, bid depository, or to any member or agent thereof, to effectuate a collusive or sham bid, and has not paid, and will not pay, any person or entity for such purpose.

Any person executing this declaration on behalf of a bidder that is a corporation, partnership,joint venture, limited liability company, limited liability partnership, or any other entity, hereby represents that he or she has full power to execute, and does execute, this declaration on behalf of the bidder. The provisions of this declaration shall not be held as disqualifying a person,firm or corporation who has submitted a sub-proposal to one bidder from submitting separate sub-proposals or quoting prices for materials or work to other bidders.

I declare under penalty of perjury under the laws of the State of California that the foregoing is true and correct and that this declaration is executed on
Jan 16, 2023 Jurupa Valley California
at
(Date) (City) (State)
rr
Signature
Kurt Eddy
Printed Name
Chief Operations Officer
Title
65 02/14/2023 C5 46 of 68

Sub Contractor Non Collusion - Ready for
Signature
Final Audit Report 2023-01-16
Created: 2023-01-16
By: Vanessa Duran([email protected])
Status: Signed
Transaction ID: CBJCHBCAASAAdBwDIFdvB4oLUb7JOA30gpJZMT29zQbt "Sub Contractor Non Collusion - Ready for Signature" History Document created by Vanessa Duran ([email protected]) 2023-01-16-6:16:08 PM GMT
Document emailed to [email protected] for signature 2023-01-16-6:17:25 PM GMT
Email viewed by [email protected]
2023-01-16-6:22:49 PM GMT
Signer [email protected] entered name at signing as Kurt Eddy 2023-01-16-6:44:52 PM GMT
I
Document e-signed by Kurt Eddy([email protected]) I
Signature Date:2023-01-16-6:44:54 PM GMT-Time Source:server I* Agreement completed.
2023-01-16-6:44:54 PM GMT
Adobe Acrobat Sign
02/14/2023 C5 47 of 68

NON-COLLUSION DECLARATION FOR SUBCONTRACTORS
TOWNSITE DRIVE COMPLETE STREETS PROJECT—CIP NO. 8312
Federal Project No.ATPL-5382 (038)

TO BE EXECUTED BY EACH AWARDEE OF A SUBCONTRACT
The undersigned declares:

I am the Estimator of_T&M Electric Inc the party making the foregoing tBtle) (Company Name)
The bid is not made in the interest of, or on behalf of, any undisclosed person, partnership, company, association, organization, or corporation. The bid is genuine and not collusive or sham. The bidder has not directly or indirectly induced or solicited any other bidder to put in a false or sham bid. The bidder has not directly or indirectly colluded, conspired, connived, or agreed with any bidder or anyone else to put in a sham bid, or to refrain from bidding. The bidder has not in any manner, directly or indirectly, sought by agreement, communication, or conference with anyone to fix the bid price of the bidder or any other bidder, or to fix any overhead, profit, or cost element of the bid price, or of that of any other bidder. All statements contained in the bid are true.The bidder has not, directly or indirectly, submitted his or her bid price or any breakdown thereof, or the contents thereof, or divulged information or data relative thereto, to any corporation, partnership, company, association, organization, bid depository, or to any member or agentthereof,to effectuate a collusive or sham bid, and has not paid, and will not pay, any person or entity for such purpose.

Any person executing this declaration on behalf of a bidder that is a corporation, partnership,joint venture, limited liability company, limited liability partnership, or any other entity, hereby represents that he or she has full power to execute, and does execute, this declaration on behalf of the bidder. The provisions of this declaration shall not be held as disqualifying a person,firm or corporation who has submitted a sub-proposal to one bidder from submitting separate sub-proposals or quoting prices for materials or work to other bidders.

I declare under penalty of perjury under the laws of the State of California that the foregoing is true and correct and that this declaration is executed on
_1-16-23 , at—Santee _California
(Date) J (City) (State)
Signature
Danny Ferguson
Printed Name
Estimator
Title
02/14/2023 C5 48 of 68

NON-COLLUSION DECLARATION FOR SUBCONTRACTORS
TOWNSITE DRIVE COMPLETE STREETS PROJECT—CIP NO. 8312
Federal Project No.ATPL-5382 (038)

TO BE EXECUTED BY EACH AWARDEE OF ASUBCONTRACT
The undersigned declares: W
I am the k171 � the party making the foregoing bid. (Title) (Company Name)
The bid is not made in the interest of, or on behalf of, any undisclosed person, partnership, company, association, organization, or corporation. The bid is genuine and not collusive or sham. The bidder has not directly or indirectly induced or solicited any other bidder to put in a false or sham bid. The bidder has not directly or indirectly colluded, conspired, connived, or agreed with any bidder or anyone else to put in a sham bid, or to refrain from bidding.The bidder has not in any manner, directly or indirectly, sought by agreement, communication, or conference with anyone to fix the bid price of the bidder or any other bidder, or to fix any overhead, profit, or cost element of the bid price, or of that of any other bidder. All statements contained in the bid are true. The bidder has not, directly or indirectly, submitted his or her bid price or any breakdown thereof, or the contents thereof, or divulged information or data relative thereto, to any corporation, partnership, company, association, organization, bid depository, or to any member or agent thereof, to effectuate a collusive or sham bid, and has not paid, and will not pay, any person or entity for such purpose.

Any person executing this declaration on behalf of a bidder that is a corporation, partnership,joint venture, limited liability company, limited liability partnership, or any other entity, hereby represents that he or she has full power to execute, and does execute, this declaration on behalf of the bidder. The provisions of this declaration shall not be held as disqualifying a person,firm or corporation who has submitted a sub-proposal to one bidder from submitting separate sub-proposals or quoting prices for materials or work to other bidders.

I declare under penalty of perjury under the laws of the State of California that the foregoing is true and correct that this declaration is executed on
at
(Dat (City) (State)
Signature
Printe Nanmre.
+u
Title
65 02/14/2023 C5 49 of 68

NON-COLLUSION DECLARATION FOR SUBCONTRACTORS
TOWNSITE DRIVE COMPLETE STREETS PROJECT- CIP NO. 8312
Federal Project No.ATPL-5382(038)

TO BE EXECUTED BY EACH AWARDEE OF A SUBCONTRACT
The undersigned declares:

I am the Mel Land+ of Landmark C011su1ti11 the party making the foregoing bid. (Title) (Company Name)
The bid is not made in the interest of, or on behalf of, any undisclosed person, partnership, company, association, organization, or corporation. The bid is genuine and not collusive or sham. The bidder has not directly or indirectly induced or solicited any other bidder to put in a false or sham bid. The bidder has not directly or indirectly colluded, conspired, connived, or agreed with any bidder or anyone else to put in a sham bid, or to refrain from bidding. The bidder has not in any manner, directly or indirectly, sought by agreement, communication, or conference with anyone to fix the bid price of the bidder or any other bidder, or to fix any overhead, profit, or cost element of the bid price, or of that of any other bidder. All statements contained in the bid are true. The bidder has not, directly or indirectly, submitted his or her bid price or any breakdown thereof, or the contents thereof, or divulged information or data relative thereto, to any corporation, partnership, company, association, organization, bid depository, or to any member or agent thereof, to effectuate a collusive or sham bid, and has not paid, and will not pay, any person or entity for such purpose.

Any person executing this declaration on behalf of a bidder that is a corporation, partnership, joint venture, limited liability company, limited liability partnership, or any other entity, hereby represents that he or she has full power to execute, and does execute, this declaration on behalf of the bidder. The provisions of this declaration shall not be held as disqualifying a person,firm or corporation who has submitted a sub-proposal to one bidder from submitting separate sub-proposals or quoting prices for materials or work to other bidders.

I declare under penalty of perjury under the laws of the State of California that the foregoing is true and correct and that this declaration is executed on
01/1 3/23 at San Diego California
, ,
(Date) (City) (State)
Signature
Printed Name
Mel Lando, PE, Principal,/CEO
Title
65 02/14/2023 C5 50 of 68

NON-COLLUSION DECLARATION FOR SUBCONTRACTORS
TOWNSITE DRIVE COMPLETE STREETS PROJECT - CIP NO.8312
Federal Project No.ATPL-5382 (038)

TO BE EXECUTED BY EACH AWARDEE OF A SUBCONTRACT
The undersigned declares:

I am the "TN�L'Tr _. of �I�7Lw�CE �ae�the party making the foregoing bid. (Title) (Company Name)
The bid is not made in the interest of, or on behalf of, any undisclosed person, partnership, company, association, organization, or corporation. The bid is genuine and not collusive or sham. The bidder has not directly or indirectly induced or solicited any other bidder to put in a false or sham bid. The bidder has not directly or indirectly colluded, conspired, connived, or agreed with any bidder or anyone else to put in a sham bid, or to refrain from bidding. The bidder has not in any manner, directly or indirectly, sought by agreement, communication, or conference with anyone to fix the bid price of the bidder or any other bidder, or to fix any overhead, profit, or cost element of the bid price, or of that of any other bidder. All statements contained in the bid are true. The bidder has not, directly or indirectly, submitted his or her bid price or any breakdown thereof, or the contents thereof, or divulged information or data relative thereto, to any corporation, partnership, company, association, organization, bid depository, or to any member or agent thereof, to effectuate a collusive or sham bid, and has not paid, and will not pay, any person or entity for such purpose.

Any person executing this declaration on behalf of a bidder that is a corporation, partnership,joint venture, limited liability company, limited liability partnership, or any other entity, hereby represents that he or she has full power to execute, and does execute, this declaration on behalf of the bidder. The provisions of this declaration shall not be held as disqualifying a person,firm or corporation who has submitted a sub-proposal to one bidder from submitting separate sub-proposals or quoting prices for materials or work to other bidders.

I declare under penalty of perjury underthe laws of the State of California that the foregoing is true and correct and that this declaration is executed on l.�`�( +
t/16 , at ❑n1`�+�Cra
(bate) (City) (State)
Signatur
a4 b
Printed Name
Title
65 02/14/2023 C5 51 of 68

NON-COLLUSION DECLARATION FOR SUBCONTRACTORS
TOWNSITE DRIVE COMPLETE STREETS PROJECT- CIP NO. 8312
Federal Project No.ATPL-5382(038)

TO BE EXECUTED BY EACH AWARDEE OF A SUBCONTRACT
The undersigned declares:

I am the %a a- of -tm�,,��.,_:� +4a ��ti- ,the party making the foregoing bid. (Title) (Company Name)
The bid is not made in the interest of, or on behalf of, any undisclosed person, partnership, company, association, organization, or corporation. The bid is genuine and not collusive or sham_ The bidder has not directly or indirectly Induced or solicited any other bidder to put in a false or sham bid. The bidder has not directly or indirectly colluded,conspired, connived, or agreed with any bidder or anyone else to put in a sham bid, or to refrain from bidding.The bidder has not in any manner, directly or indirectly,sought by agreement, communication,or conference with anyone to fix the bid price of the bidder or any other bidder, or to fix any overhead, profit, or cost element of the bid price, or of that of any other bidder. All statements contained in the bid are true. The bidder has not, directly or indirectly, submitted his or her bid price or any breakdown thereof, or the contents thereof, or divulged information or data relative thereto, to any corporation, partnership, company, association, organization, bid depository, or to any member or agent thereof, to effectuate a collusive or sham bid,and has not paid, and will not pay,any person or entity for such purpose.

Any person executing this declaration on behalf of a bidder that is a corporation, partnership,joint venture, limited liability company,limited liability partnership, or any other entity,hereby represents that he or she has full power to execute, and does execute, this declaration on behalf of the bidder_ The provisions of this declaration shall not be held as disqualifying a person,firm or corporation who has submitted a sub-proposal to one bidder from submitting separate sub-proposals or quoting pricesfor materials or work to other bidders.

I declare under penalty of perjury under the laws of the State of California thatthe foregoing is true and correct and that this declaration is executed on
(Date) (City) (State)
Signature
Printed Name
Title
65 02/14/2023 C5 52 of 68

000,11,1111111111,11,Illjlllllll'I

CITY OF VISTA

F N ( A
January 4, 2023
ADDENDUM NO. 1
To the Contract Documents for:

Townsite Drive Complete Streets Project
C.I.P. No. 8312, Federal Project No.ATPL-5382 (38)
D-4639, LD#21-025
City of Vista
200 Civic Center Drive
Vista, CA 92084-6240
IC-79
C! Y EK<NEER
To All Contract Document Holders of Record: All contract drawings,specifications, contract documents and other bidding directives remain unchanged except drawings, specifications, sections or parts of sections added to, revised, deleted or clarified by this Addendum.

CHANGES TO THE BIDDING AND CONTRACTURAL DOCUMENTS

1. Bid Opening date change.

The Townsite Drive Complete Street Project, West California Ave., C.I.P. No. 8312 is a Federally funded project that requires the prevailing wages to be fixed within 10 days prior to the bid opening. Due to download issues with the sam.gov website, the prevailing wages were not available until Jan 4, 2023.To meet the 10-day requirement,the bid opening date is changed to Tuesday,January 17, 2023, at 2:00 PM.

2. Prevailing Wage Determination
Add the following prevailing wages to the contract documents:

The Townsite Drive Complete Street Project, West California Ave., C.I.P. No. 8312 is a Federally funded project that requires the prevailing wages to be fixed within 10 days prior to the bid opening.Attached are the prevailing wages to use for this project.

END OF ADDENDUM

Page 1 of 1 ends

02/14/2023 C5 53 of 68

California Secretary of State
Electronic Certified Copy
I, ALEX PADILLA, Secretary of State of the State of California, hereby certify that the attached transcript of 2 pages is a full, true and correct copy of the original record in the custody of the California Secretary of State's office.
aF T IN WITNESS WHEREOF, I execute
� EVREW, this certificate and affix the Great
r"e P Seal of the State of California on
aW _4 r this day of October 29, 2020

ALEX PADILLA
Secretary of State
Verification Number: KWW2AWK
Entity (File) Number: C3286410
To verify the issuance of this Certificate, use the Verification Number above with the Secretary of State Electronic Verification Search available at bizfile.sos.ca.gov
02/14/2023 C5 54 of 68

California Secretary of State
n Electronic Filing Secretary of State
�•�� �� State of California
Corporation - Statement of Information
Entity Name: L.C. PAVING & SEALING, INC.

Y
Entity (File) Number: C3286410 Q
File Date: 10/27/2020
Entity Type: Corporation Y
Jurisdiction: CALIFORNIACj
o
Document ID: GK49303 E
Detailed Filing Information
O

1. Entity Name: L.C. PAVING & SEALING, INC.
ca
U T

2. Business Addresses: ; 'o
a. Street Address of Principal
Office in California: 620 ALPINE WAY
ESCONDIDO, California 92029 U
United States of America
O a�
U �
b. Mailing Address 620 ALPINE WAY
ESCONDIDO, California 92029
United States of America
c. Street Address of Principal
Executive Office: 620 ALPINE WAY
ESCONDIDO, California 92029
United States of America o

3. Officers: M
rn
a. Chief Executive Officer: JOSE A. SALINAS Y CD
620 ALPINE WAY
ESCONDIDO, California 92029 ,
United States of America C:

N
b. Secretary: JOSE A. SALINAS E
620 ALPINE WAY 0
U
ESCONDIDO, California 92029 O
United States of America 0
0211412W bizfile._ for online filings, Orches, business records, and resources 55 Of 68

64-�1,tN
�. California Secretary of State
Electronic Filing
Officers (cont'd):
c. Chief Financial Officer: JOSE A. SALINAS
620 ALPINE WAY
ESCONDIDO, California 92029
United States of America Y
a

4. Director: JOSE A. SALINAS N
620 ALPINE WAY
ESCONDIDO, California 92029 Y
`
Number of Vacancies on the Board of United States of America a) o Directors: 0 E

5. Agent for Service of Process: Z
JOSE A. SALINAS
620 ALPINE WAY O ZE
ESCONDIDO, California 92029 M �
United States of America ;,,U
_ o

6. Type of Business: CONSTRUCTION (D a, CU
a) U
a--j O
M 0
L)
N ai
By signing this document, I certify that the information is true and correct and that I am authorized by (� California law to sign.

Electronic Signature: Marisa Haas
Use bizfile.sos.ca.gov for online filings, searches, business records, and resources. o co
Y
C�
I�
C
N
E
U
O
r)
02/14/2023 C5 56 of 68

Local Assistance Procedures Manual Exhibit 15-G Construction Contract DBE Commitment
EXHIBIT 15-G CONSTRUCTION CONTRACT DBE COMMITMENT

1. Local Agency: 2.Contract DBE Goal: 6%

3. Project Description: Townsite Drive Complete Streets Project

4. Project Location: Vista,California
5 Bidder's Name: LC Paving& Sealing,Inc. 6. Prime Certified DBE: Ip 7. Bid Amount: $ 3,150,284.50 8 Total Dollar Amount for ALL Subcontractors: $ 1,005,338.30 9.Total Number of ALL Subcontractors. 6

10. Bid 12. DBE 14. DBE
Item 11. Description of Work,Service,or Materials Certification 13 DBE Contact Information Dollar Number Supplied Number (Must be certified on the date bids are opened) Amount 1-7,9-19 All Construction Items Not Including Specialty Sub Contracted 20499 LC Paving&Sealing.Inc.Marisa Haas 760-752-1743 $2,144,945.00 23-25 29-31,39-42144-591 & 61
20-22 Striping Removals,Signage&Pavement ivlarldrtgs Line Items 20,22.&.60 32232 Statewide Stripes,Inc. Sean Bayot 858-560-6887 $ 117.290.00 Local Agency to Complete this Section upon Execution of Award

21. Local Agency Contract Number:
$2,262,235.00

15.TOTAL CLAIMED DBE PARTICIPATION

22. Federal-Aid Project Number: 71.80 %

23. Bid Opening Date:

24.Contract Award Date:

IMPORTANT: Identify all DBE firms being claimed for credit,

25.Award Amount: regardless of tier. Names of the First Tier DBE Subcontractors and their respective item(s)of work listed above must be consistent, where applicable with the names and items of the work in the Local Agency certifies that all DBE certifications are valid and information on "Subcontractor Li abmitt d with your bid.Written confirmation of this form is complete and accurate. each listed is re (0, Lc7

26. Local Agency Representative's Signature 27. Date 16. reparer's Signature 17. Date a1�l cc _160'`1S2-I_7 3

28.Local Agency Representative's Name 29. Phone 18. Preparer's Name �- 19.Phone 6 30. Local Agency Representative's Title 20. Preparer's Title DISTRIBUTION: 1. Original-Local Agency

2. Copy-Caltrans District Local Assistance Engineer(DLAE). Failure to submit to DLAE within 30 days of contract execution may result in de-obligation of federal funds on contract.

3. Include additional copy with award package.

LPP 18-01 Page 1 of 3
January 02/14/2023 57 of 68 2019

Local Assistance Procedures Manual Exhibit 15-G Construction Contract DBE Commitment
ADA Notice: For individuals with sensory disabilities,this document is available in alternate formats For information call(916)654-6410 or TDD(916)654- 3880 or write Records and Forms Management,1120 N Street,MS-89,Sacramento,CA 95814.

INSTRUCTIONS—CONSTRUCTION CONTRACT DBE COMMITMENT

CONTRACTOR SECTION

1. Local Agency- Enter the name of the local agency that is administering the contract.

2. Contract DBE Goal- Enter the contract DBE goal percentage as it appears on the project advertisement.

3. Project Location - Enter the project location(s)as it appears on the project advertisement.

4. Project Description - Enter the project description as it appears on the project advertisement(Bridge Rehab, Seismic Rehab, Overlay, Widening, etc).

5. Bidder's Name- Enter the contractor's firm name.

6. Prime Certified DBE- Check box if prime contractor is a certified DBE.

7. Bid Amount- Enter the total contract bid dollar amount for the prime contractor.

8. Total Dollar Amount for ALL Subcontractors—Enter the total dollar amount for all Subcontracted contractors.

SUM =(DBEs+all Non-DBEs). Do not include the prime contractor information in this count.

9. Total number of ALL subcontractors— Enter the total number of all subcontracted contractors. SUM =(DBEs+all Non-DBEs). Do not include the prime contractor information in this count.

10. Bid Item Number- Enter bid item number for work, services, or materials supplied to be provided.

11. Description of Work, Services,or Materials Supplied - Enter description of work, services, or materials to be provided. Indicate all work to be performed by DBEs including work performed by the prime contractor's own forces, if the prime is a DBE. If 100%of the item is not to be performed or furnished by the DBE, describe the exact portion to be performed or furnished by the DBE. See LAPM Chapter 9 to determine how to count the participation of DBE firms.

12. DBE Certification Number- Enter the DBE's Certification Identification Number. All DBEs must be certified on the date bids are opened.

13. DBE Contact Information - Enter the name,address, and phone number of all DBE subcontracted contractors.

Also, enter the prime contractor's name and phone number, if the prime is a DBE.

14. DBE Dollar Amount- Enter the subcontracted dollar amount of the work to be performed or service to be provided. Include the prime contractor if the prime is a DBE. See LAPM Chapter 9 for how to count full/partial participation.

15. Total Claimed DBE Participation -$: Enter the total dollar amounts entered in the "DBE Dollar Amount"column. %: Enter the total DBE participation claimed ("Total Claimed DBE Participation Dollars" divided by item "Bid Amount"). If the total %claimed is less than item "Contract DBE Goal,"an adequately documented Good Faith Effort (GFE) is required (see Exhibit 15-H DBE Information -Good Faith Efforts of the LAPM).

16. Preparer's Signature-The person completing the DBE commitment form on behalf of the contractor's firm trust sign their name.

17. Date- Enter the date the DBE commitment form is signed by the contractor's preparer.

18. Preparer's Name- Enter the name of the person preparing and signing the contractor's DBE commitment form.

19. Phone- Enter the area code and phone number of the person signing the contractor's DBE commitment form.

20. Preparer's Title- Enter the position/title of the person signing the contractor's DBE commitment form.

LOCAL AGENCY SECTION

21. Local Agency Contract Number- Enter the Local Agency contract number or identifier.

22. Federal-Aid Project Number- Enter the Federal-Aid Project Number(s).

23. Bid Opening Date- Enter the date contract bids were opened.

24. Contract Award Date- Enter the date the contract was executed.

25. Award Amount— Enter the contract award amount as stated in the executed contract.

26. Local Agency Representative's Signature-The person completing this section of the form for the Local Agency must sign their name to certify that the information in this and the Contractor Section of this form is complete and accurate.

27. Date- Enter the date the DBE commitment form is signed by the Local Agency Representative.

28. Local Agency Representative's Name- Enter the name of the Local Agency Representative certifying the contractor's DBE commitment form.

29. Phone- Enter the area code and phone number of the person signing the contractor's DBE commitment form.

LPP 18-01 Page 2 of
E-3 January 2019
02/14/2023 C5 58 of 68

Local Assistance Procedures Manual Exhibit 15-G Construction Contract DBE Commitment

30. Local Agency Representative Title- Enter the position/title of the Local Agency Representative certifying the contractor's DBE commitment form. `
LPP 18-01 Page 3 of 3
E-4
January2019
02/14/2023 C5 59 of 68

Local Assistance Procedures Manual Exhibit 15-H Proposer/Contractor Good Faith Effort
EXHIBIT 15-H: PROPOSER/CONTRACTOR GOOD FAITH EFFORTS
Cost Proposal Due Date PE/CE
Federal-aid Project No(s) _ Bid Opening Date _ CON The established a Disadvantaged Business Enterprise (DBE) goal of

0.00% for this contract. The information provided herein shows the required good faith efforts to meet or exceed the DBE contract goal.

Proposers or bidders submit the following information to document their good faith efforts within five (5) cr.lenda! days from cost proposal due date or bid opening. Proposers and bidders are recommended to submit the following information even if the Exhibit 10-01: Consultant Proposal DBE Commitments or Exhibit 15-G:

Construction Contract DBE Commitment indicate that the proposer or bidder has met the DBE goal. This form protects the proposer's or bidder's eligibility for award of the contract if the administering agency determines that the bidder failed to meet the goal for various reasons, e.g., a DBE firm was not certified at bid opening, or the bidder made a mathematical error.

The following items are listed in the Section entitled "Submission of DBE Commitment" of the Special Provisions, please attach additional sheets as needed:

A. The names and dates of each publication in which a request for DBE participation for this project was placed by the bidder(please attach copies of advertisements or proofs of publication):

Publications Dates of Advertisement
B. The names and dates of written notices sent to certified DBEs soliciting bids for this project and the dates and methods used for following up initial solicitations to determine with certainty whether the DBEs were interested (please attach copies of solicitations, telephone records, fax confirmations, etc.).

Names of DBEs Solicited Date of Initial Solicitation Follow Up Methods and Dates

Page 1 of 3 ends

E-5 May 2020
02/14/2023 C5 60 of 68

Local Assistance Procedures Manual Exhibit 15-H Proposer/Contractor Good Faith Effort
C. The items of work made available to DBE firms including those unbundled contract work items into economically feasible units to facilitate DBE participation. It is the bidder's responsibility to demonstrate that sufficient work to facilitate DBE participation in order to meet or exceed the DBE contract goal.

Items of Proposer or Bidder Breakdown of Amount Percentage Work Normally Performs Item Items ($) Of (Y/N) Contract
Pick 0.00%
Pick 0.00%
Pick 0.00%
Pick 0.00%
D. The names, addresses and phone numbers of rejected DBE firms, the reasons for the bidder's rejection of the DBEs, the firms selected for that work (please attach copies of quotes from the firms involved), and the price difference for each DBE if the selected firm is not a DBE:

Names, addresses and phone numbers of rejected DBEs and the reasons for the bidder's rejection of the DBEs:

Names, addresses and phone numbers of firms selected for the work above:

E. Efforts (e.g. in advertisements and solicitations) made to assist interested DBEs in obtaining information related to the plans, specifications and requirements for the work which was provided to DBEs:

Page 2 of 3 ends

E-6 May 2020
02/14/2023 C5 61 of 68

Local Assistance Procedures Manual Exhibit 15-H Proposer/Contractor Good Faith Effort
F. Efforts (e.g. in advertisements and solicitations) made to assist interested DBEs in obtaining bonding, lines of credit or insurance, necessary equipment, supplies, materials, or related assistance or services, excluding supplies and equipment the DBE subcontractor purchases or leases from the prime contractor or its affiliate:

G. The names of agencies, organizations or groups contacted to provide assistance in contacting, recruiting and using DBE firms (please attach copies of requests to agencies and any responses received, i.e., lists, Internet page download, etc.):

Name of Agency/Organization Method/Date of Contact Results H. Any additional data to support a demonstration of good faith efforts:

Page 3 of 3 ends

E-7 May 2020
02/14/2023 C5 62 of 68

Bond No.

Premium: $
Effective Date:

PAYMENT BOND
(LABOR AND MATERIALS)
KNOW ALL PERSONS BY THESE PRESENTS that:

The City of Vista ("City") has awarded a contract (the "Contract") to L.C. Paving & Sealing, Inc. ("Principal"), as follows:

Townsite Drive Complete Streets Project(CIP No. 8312),
which Contract, and all Contract Documents set forth therein, are incorporated herein and made a part thereof by this reference.

Principal is required under the terms of the Contract and the California Civil Code to furnish a bond to secure the prompt,full, and faithful payment of any Claimant, as hereinafter defined, for all labor, materials or services used or reasonably required for use in the performance of the work, concurrently with delivery to City of the signed Contract.

NOW, THEREFORE, we, the undersigned Principal, and
(Name, address,and telephone number of Surety)
("Surety") a duly admitted surety insurer under the laws of the State of California, as Surety, are held and firmly bound unto City in the penal sum of Three Million One Hundred Fifty Thousand Two Hundred Eighty Four Dollars and Five Cents ($3,150,284.05), this amount being not less than one hundred percent (100%) of the total contract price, in lawful money of the United States of America, for the payment of which sum well and truly to be made, we bind ourselves, our heirs, executors, administrators, successors, and assigns,jointly and severally, firmly by these presents.

THE CONDITION OF THIS OBLIGATION IS SUCH THAT, if the hereby bounded Principal, his, her or its heirs, executors, administrators, successors or assigns, or subcontractors shall fail to pay any of the persons named in Division 4, Part 6, Title 3 of the California Civil Code(§ 9000 et seq.), or any amounts due under the Unemployment Insurance Code with respect to work or labor performed under the Contract, or for any amounts required to be deducted, withheld, and paid over to the Employment Development Department from the wages of employees of Principal and subcontractors pursuant to Section 13020 of the Unemployment Insurance Code,with respect to work or labor performed under the Contract ("Claimants"), Surety will pay for the same in an amount not exceeding the penal sum specified in this bond; otherwise, this obligation shall become null and void.

This bond shall inure to the benefit of any of the persons named in Division 4, Part 6, Title 3 of the California Civil Code (§ 9000 et seq.), so as to give a right of action to such persons or their assigns in any suit brought upon the bond.

In case suit is brought upon this bond to enforce or interpret this bond's terms, Surety further agrees to pay all court costs and reasonable attorneys' fees in an amount fixed by the court. Principal and Surety agree that this Performance Bond shall not be considered a part of the Contract but rather is a separate obligation of Principal and its Surety, and that any attorneys'fee provision contained in this Performance Bond shall not apply to the Contract.

In the event there is any litigation between the parties arising from the breach of the Contract, each party will bear its own attorneys' fees in the litigation.

FURTHER, Surety, for value received, hereby stipulates and agrees that no change, extension of time, alteration, addition or modification to the terms of the Contract, or of the work to be performed thereunder, or the specifications for the same, shall in any way affect its obligations under this bond, and it does hereby waive notice of any such change, extension of time, alteration, addition, or modification to the terms of the Contract or to the work or to the specifications thereunder. Surety hereby waives the provisions of California Civil Code §§ 2819, 2845, and 2849.

City is an intended beneficiary of this bond and has all rights of a party thereto.

CITY OF VISTA Page 1 of 2 L.C.PAVING&SEALING,INC. 00065304 5[00065304 31 PAYMENT BOND(LABOR&MATERIALS) 02/14/2023 C5 63 of 68

IN WITNESS WHEREOF, this instrument has been duly executed by Principal and Surety, on the date set forth below, the name of each corporate party being hereto affixed and these presents duly signed by its undersigned representative(s) pursuant to authority of its governing body.

Dated:
"Principal" "'Surety"
L.C. PAVING & SEALING, INC.

By:

Signature
Name and Title By:

Signature
By: Name and Title
Signature
Name and Title By:

Signature
(Seal)
Name and Title
(Seal)
This bond must be dated, all signatures must be notarized, and evidence of the authority of any person signing as attorney-in-fact must be attached.

APPROVED
Amanda L.Guy
20230119094639
CITY OF VISTA Page 2 of 2 L.C.PAVING&SEALING,INC. 00065304 5[00065304 3] PAYMENT BOND(LABOR&MATERIALS) 02/14/2023 C5 64 of 68

Bond No.

Premium: $
Effective Date:

PERFORMANCE BOND
KNOW ALL PERSONS BY THESE PRESENTS that:

The City of Vista ("City") has awarded a contract (the "Contract") with L.C. Paving & Sealing, Inc. ("Principal") as follows:

Townsite Drive Complete Streets Project(CIP No. 8132),
which Contract, and all Contract Documents set forth therein, are incorporated herein and made a part thereof by this reference.

Principal is required under the terms of the Contract to furnish a bond guaranteeing the prompt, full, and faithful performance of the Contract concurrently with delivery of the signed Contract to City.

NOW, THEREFORE, we, the undersigned Principal, and
(Name, address,and telephone number of Surety)
("Surety") a duly admitted surety insurer under the laws of the State of California, as Surety, are held and firmly bound unto City in the penal sum of Three Million One Hundred Fifty Thousand Two Hundred Eighty Four Dollars and Five Cents ($3,150,284.05), this amount being not less than one hundred percent (100%) the total contract price, in lawful money of the United States of America, for the payment of which sum well and truly to be made, we bind ourselves, our heirs, executors, administrators, successors, and assigns,jointly and severally, firmly by these presents.

THE CONDITION OF THIS OBLIGATION IS SUCH THAT, if the hereby bounded Principal, his, her or its heirs, executors, administrators, successors or assigns, shall in all things stand to and abide by, and well and truly keep and perform all the undertakings, terms, covenants, conditions and agreements in the Contract and any alteration thereof made as therein provided, on Principal's part to be kept and performed, all within the time and in the manner therein specified, and in all respects according to their true intent and meaning, and shall indemnify and hold harmless City and its officers, agents,and others as therein provided,from any and all losses, liability and damages, claims, judgments, stop payment notices, costs, and fees of every description, whether imposed by law or equity, which may be incurred by City by reason of the failure or default on the part of Principal in the performance of any or all of the terms or the obligations of the Contract Documents, as they may be amended and supplemented including, but not limited to, Principal's liability for City's damages (including direct and consequential damages incurred by City for: rental expenses; losses of use, income, profit, business, and reputation; increased financing costs; and loss of management or employee productivity or of the services of such persons) caused by Principal's delays, as well as Principal's liability for other delay damages or liquidated damages, and any warranties or guarantees required thereunder; then this obligation shall become null and void; otherwise, it shall be and remain in full force and effect.

When City declares that Principal is in default under the Contract, Surety shall promptly, take one of the following actions:
(a) Remedy the default;
(b) Undertake through its agents or independent contractors reasonably acceptable to City, to complete the Project according to the Contract Documents' terms and conditions then in effect including without limitation, all obligations with respect to warranties, guarantees, and the payment of liquidated damages; or, if required by City; (c) Obtain a bid or bids for completing the Contract in accordance with its terms and conditions using a procurement methodology approved by City, select a contractor or contractors—acceptable to City—to complete all of the Work, and arrange for a contract between the contractor(s)and City, to be secured with performance and payment bonds executed by an admitted surety insurer equivalent to the bonds issued on the Construction Contract, CITY OF VISTA Page 1 of 3 L.C.PAVING&SEALING,INC. 00065305 5[00065305 31 PERFORMANCE BOND(FAITHFUL PERFORMANCE) 02/14/2023 C5 65 of 68

and Surety shall make available, as the Work progresses, sufficient funds to pay the cost of completion less the balance of the Contract Sum, and to pay and perform all obligations of Principal under the Contract and Contract Documents, including other costs and damages for which Surety is liable under this Bond and all obligations with respect to warranties, guarantees, and the payment of liquidated damages as a result of Contractor's default; (d) Waive its right to perform and complete, arrange for completion, or obtain a new contractor and with reasonable promptness under the circumstances:
(i) After investigation, determine the amount for which it may be liable to City and, as soon as practicable after the amount is determined, make payment to City; or (ii) Deny liability in whole or in part and notify City, citing the reasons for denial.

If Surety does not proceed as provided above with reasonable promptness, Surety shall be deemed to be in default on this Bond seven days after receipt of an additional written notice from City to Surety demanding that Surety perform its obligations under this Bond, and City shall be entitled to enforce any remedy available to City. If Surety admits liability and tenders payment, and City refuses the payment, or Surety has denied liability, in whole or in part, without further notice City shall be entitled to enforce any remedy available to City.

In case suit is brought upon this bond, Surety further agrees to pay all court costs and reasonable attorneys' fees in an amount fixed by the court. Principal and Surety agree that this Performance Bond shall not be considered a part of the Contract but rather is a separate obligation of Principal and its Surety, and that any attorneys' fee provision contained in this Performance Bond shall not apply to the Contract. In the event there is any litigation between the parties arising from the breach of the Contract, each party will bear its own attorneys' fees in the litigation.

FURTHER, Surety, for value received, hereby stipulates and agrees that no change, extension of time, alteration, addition or modification to the terms of the Contract, or of the work to be performed thereunder, or the specifications for the same, shall in any way affect its obligations under this bond, and it does hereby waive notice of any such change, extension of time, alteration, addition, or modification to the terms of the Contract or to the work or to the specifications thereunder. Surety hereby waives the provisions of California Civil Code §§ 2819, 2845, and 2849.

City is an intended beneficiary of this bond and has all rights of a party thereto. [Text and signatures continued on page 3.]
CITY OF VISTA Page 2 of 3 L.C.PAVING&SEALING,INC. 00065305 5[00065305 31 PERFORMANCE BOND(FAITHFUL PERFORMANCE) 02/14/2023 C5 66 of 68

IN WITNESS WHEREOF, two (2) identical counterparts of this instrument, each of which shall for all purposes be deemed an original hereof, have been duly executed by Principal and Surety, on the date set forth below, the name of each corporate party being hereto affixed and these presents duly signed by its undersigned representative(s) pursuant to authority of its governing body.

Dated:
"Principal" "'Surety"
L.C. PAVING &SEALING, INC.

By:

Signature
Name and Title By:

Signature
By: Name and Title
Signature
Name and Title By:
(Seal) Signature
Name and Title
(Seal)
This bond must be dated, all signatures must be notarized, and evidence of the authority of any person signing as attorney-in-fact must be attached.

APPROVED
Amanda L.Guy
20230119094810
CITY OF VISTA Page 3 of 3 L.C.PAVING&SEALING,INC. 00065305 5[00065305 3] PERFORMANCE BOND(FAITHFUL PERFORMANCE) 02/14/2023 C5 67 of 68

EXHIBIT 3

BID DOCUMENTS

ON FILE IN CITY CLERK'S OFFICE
EXHIBIT 3
02/14/2023 C5 68 of 68