EXHIBIT 4
100111290 1}
06/13/2023 C4 176 of 181
I ra •
124 77.17306320 92 , � 771,306331 7717306249 1,1730652719 77ill,7306311 1730652732 77.1F7306202 ` 7 J.7306318 7714306263 f23 120 1
W Connect existing r
7717306259 7717306345 1730652738 1730652748 drainage inlet to new 4 E "°` 7717306210 storm drain pipe
Convert existing open
channel to closed channel Protect existing :
Connect existing p CMU wall in lace Install wing headwall and drainage inlet to new by extending two (2) RCP trash capture device at storm drain pipe storm drain pipes. Size
p p n .� - 113065272
new open to closed
TBD during
design � ,
.g r717306325 .6237 11 3065272 771/306343 ' channel transition. Size TBD during design
Connect proposed a1-nle 1 storm drain to 7711 .306253 7,7j1,7306227
existing double 48" .,, THE required from VUSD storm drain. Remove r' _
for property access during �
existing wing type _ _ "�� construction headwall
)4
M /
ti
r 1440 4
Existing 10'
sidewalk and
driveway to remain �.
- Construct �♦ �
New 5' sidewalk, driveway to Existing 5'
curb and gutter access trash sidewalk to remain Widen roadway to match west �► end curb & sidewalk. Repair per SRF-06G capture device approx. 2' of existing roadway AC
pavement section per SRF-06G
New inlet to capture road
1:iul a — ► �*`
runoff, size and locationdh�mllllw
ell M. MLWMW TBD during design \,
Monte Mar Storm Drain Improvements Project
N
CITY OF VISTA n
1 inch = 50 feet
0 20 40 80
ft
Disclaimer:Map and parcel data are believed to be accurate,but accuracy is notguaranteed.This is not a legal document and should not be substituted for a title search,appraisal,survey,orforzoning verification. 06/13/2023 C4 177 of 181
Design / Build Services Agreement
MONTE MAR STORM DRAIN IMPROVEMENTS PROJECT (CIP No. 8905)
EXHIBIT 5
100111290 1}
06/13/2023 C4 178 of 181
AGREEMENT TO COMPLY WITH CALIFORNIA LABOR LAW REQUIREMENTS
TO BE EXECUTED BY BIDDER AND SUBMITTED WITH BID
[Labor Code§§ 1720, 1771.1, 1725.5, 1773.3, 1773.8, 1775, 1776, 1777.5, 1813, 1860, 1861, 37001 The undersigned Contractor certifies that it is aware of and hereby agrees to fully comply with the following provisions of California law:
1. No contractor or subcontractor may be listed on a bid proposal for a public works project unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5 [with limited exceptions from this requirement for bid purposes only under Labor Code section 1771.1(a)]. No contractor or subcontractor of any tier may be awarded a contract for public work on a public works project without proof of registration with the Department of Industrial Relations pursuant to Labor Code section 1725.5.
This project is subject to compliance monitoring and enforcement by the Department of Industrial Relations.
2. Contractor acknowledges that this contract is subject to the provisions of Division 2, Part 7, Chapter 1 (commencing with Section 1720) of the California Labor Code relating to public works and the awarding public agency ("Agency") and agrees to be bound by all the provisions thereof as though set forth in full herein.
3. Contractor agrees to comply with the provisions of California Labor Code Section 1773.8 which requires the payment of travel and subsistence payments to each worker needed to execute the work to the extent required by law.
4. Contractor agrees to comply with the provisions of California Labor Code Sections 1774 and 1775 concerning the payment of prevailing rates of wages to workers and the penalties for failure to pay prevailing wages. The Contractor shall, as a penalty to the Agency, forfeit not more than fifty dollars ($50) for each calendar day, or portion thereof, for each worker paid less than the prevailing rates as determined by the Director of Industrial Relations for the work or craft in which the worker is employed for any public work done under the contract by Contractor or by any subcontractor.
5. Contractor agrees to comply with the provisions of California Labor Code Section 1776 which require Contractor and each subcontractor to (1) keep accurate payroll records, (2) certify and make such payroll records available for inspection as provided by Section 1776, and (3) inform the Agency of the location of the records. The Contractor is responsible for compliance with Section 1776 by itself and all of its subcontractors.
6. Contractor agrees to comply with the provisions of California Labor Code Section 1777.5 concerning the employment of apprentices on public works projects, and further agrees that Contractor is responsible for compliance with Section 1777.5 by itself and all of its subcontractors.
7. Contractor agrees to comply with the provisions of California Labor Code Section 1813 concerning penalties for workers who work excess hours. The Contractor shall, as a penalty to the Agency, forfeit twenty-five dollars ($25)for each worker employed in the execution of the contract by the Contractor or by any subcontractor for each calendar day during which such worker is required or permitted to work more than 8 hours in any one calendar day and 40 hours in any one calendar week in violation of the provisions of Division 2, Part 7, Chapter 1,Article 3 of the California Labor Code.
8. Registrations under Section 1725.5 expire annually at the end of June, and Contractor is responsible for verifying the renewal status of each subcontractor, of any tier, working on this Contract, and providing City with an updated list of all subcontractors and their registration status. Subcontractors who do not timely renew their registration must be removed from the job site until they are registered.The removal of a subcontractor for failure to be registered shall not be cause for any extension of time or additional compensation of any nature under the Contract.
9. Contractor shall provide to City, as a condition precedent to the payment of Contractor's final retention, a complete list of all subcontractors who have worked on the Project, including their registration numbers. This list must be provided at least 30days prior to the payment of the final retention and shall be submitted under penalty of perjury.
10. To the fullest extent permitted by law and without limitation by the other provisions of this Contract relating to indemnification and insurance, Contractor shall also indemnify, defend and hold harmless City, 000195963
06/13/2023 C4 179 of 181
and its directors, officers, employees and agents from and against all liability, excluding penalties assessed against City under Labor Code Section 1773.3, but including, without limitation, associated investigation and administrative expenses, defense costs, reasonable attorneys' fees, expert witness fees, court costs, and costs of alternative dispute resolution, resulting from Contractor's failure to comply with the provisions of this section and of Article 2, Chapter 1, Part 7, Division 2 of the California Labor Code with respect to Contractor, all subcontractors of any tier, and their respective employees working under this Contract.
11. California Labor Code Sections 1860 and 3700 provide that every contractor will be required to secure the payment of compensation to its employees. In accordance with the provisions of California Labor Code Section 1861, Contractor hereby certifies as follows:
"I am aware of the provisions of Section 3700 of the Labor Code which require every employer to be insured against liability for worker's compensation or to undertake self-insurance in accordance with the provisions of that code, and I will comply with such provisions before commencing the performance of the work of this contract."
Signature Date
Name/Title Company:
000195963
06/13/2023 C4 180 of 181
I ra •
124 77.17306320 92 , � 771,306331 7717306249 1,1730652719 77ill,7306311 1730652732 77.1F7306202 ` 7 J.7306318 7714306263 f23 120 1
Connect existing r
7717306259 7717306345 1730652738 1730652748 drainage inlet to new 4 E "°` 7717306210 storm drain pipe
Convert existing open
channel to closed channel Protect existing :
Connect existing p CMU wall in lace Install wing headwall and drainage inlet to new by extending two (2) RCP trash capture device at storm drain pipe storm drain pipes. Size
p p TBD during design �.� - 113065272 new open to closed
g ,
.g r717306325 .6237 11 3065272 771/306343 ' channel transition. Size TBD during design
Connect proposed a'-ned 1 storm drain to 7711 .306253 7,7j1,7306227
existing double 48" .,, THE required from VUSD storm drain. Remove r' _
for property access during �
existing wing type _ _ "�� construction headwall
)4
M /
ti
r 1440 4
Existing 10'
sidewalk and
driveway to remain �.
- Construct �♦ �
New 5' sidewalk, driveway to Existing 5'
curb and gutter access trash sidewalk to remain Widen roadway to match west �► end curb & sidewalk. Repair per SRF-06G capture device approx. 2' of existing roadway AC
pavement section per SRF-06G
New inlet to capture road
1:iul a — ► �*`
runoff, size and locationdh�mllllw
ell M. MLWMW TBD during design \,
Monte Mar Storm Drain Improvements Project
N
CITY OF VISTA n
1 inch = 50 feet
0 20 40 80
ft
Disclaimer:Map and parcel data are believed to be accurate,but accuracy is notguaranteed.This is not a legal document and should not be substituted for a title search,appraisal,survey,orforzoning verification. 06/13/2023 C4 EXHIBIT 3 181 of 181