Cities Index.
cc 2024 AR 05/28 cip 8331 fire station 3 replacement projectCIP 8331 Fire Station 3 Replacement Project - First Amendment

Vista City Council
May 28, 2024

Document
cc 2024 AR 05/28 cip 8331 fire station 3 replacement projectCIP 8331 Fire Station 3 Replacement Project - First Amendment
Meeting
May 28, 2024
Body
Vista City Council
Pages
2
Original file
34 KB
Text extracted from the city's file for reading and search. Open the original on portal.laserfiche.com. That file is the official record.

ACTION:
____________________________
Clerk/Secretary
Department: Engineering Item No: C6
Prepared by:

Erin Adams, Administrative Programs
Manager Meeting Date: May 28, 2024
Approved by:

Greg Mayer, Director of Engineering
John Conley, City Manager Agenda Location: Consent Calendar SUBJECT: CIP NO. 8331 – FIRE STATION NO. 3 REPLACEMENT PROJECT – FIRST AMENDMENT TO THE AGREEMENT WITH ERICKSON-HALL CONSTRUCTION CO.

RECOMMENDATION:

1. Adopt City Council Resolution No. 2024- , approving the first amendment to the agreement with Erickson-Hall Construction Co. for design/build services for the Fire Station No. 3 Replacement Project (CIP No. 8331).

2.Adopt City Council Resolution No. 2024- , amending the Capital Project Budget for Fiscal Years 2022/23 and 2023/24.

CORRELATION TO CITY COUNCIL GOALS: Public Safety.

PRIOR ACTION: On October 11, 2022, the City Council adopted Resolution No. 2022-149 approving an agreement with Erickson-Hall Construction Co. for design/build services for the Fire Station No. 3 Replacement Project (CIP No. 8331) (Vote: 4-0, Green absent).

On June 28, 2022, adopted City Council Resolution No. 2022-108, approving the Six-Year Capital Improvement Program and FYs 2022/23 and 2023/24 Capital Project Budget and authorizing appropriations for Fiscal Years 2022/23 and 2023/24 Capital Projects (Vote: 4-0, Ritter absent (Ritter experienced technical difficulties)).

STATEMENT ON THE SUBJECT: Vista Fire Station No. 3, located at 1070 Old Taylor Street (Vicinity Map included as Exhibit 5), is over 60 years old and is in need of modernization. Capital Improvement Program (CIP) Project No. 8331, the Fire Station No. 3 Replacement Project, will demolish the existing structures and construct an approximately 8,200 square foot fire station and all appurtenances. The replacement will provide a new facility built to current essential services standards to allow for firefighters to rapidly respond to the growing needs of the community. In addition, the project includes remodeling an existing Vista Unified School District (VUSD) building, located at 1250 Arcadia Avenue, to temporarily serve as the fire station during the fire station reconstruction. A separate License Agreement for temporary use of the VUSD facility was previously processed.

First Amendment to the Design-Build Agreement. On October 11, 2022, City Council awarded the Design-Build Team (DBT) of Erickson-Hall Construction Co. (Erickson-Hall) the design portion of the project. The DBT has completed the design, and staff has negotiated a Guaranteed Maximum Price AGENDA
REPORT

CITY COUNCIL

COMMUNITY DEVELOPMENT COMMISSION

SUCCESSOR AGENCY

BUENA SANITATION DISTRICT

JOINT POWERS FINANCING AUTHORITY
Approved above recommendation, adopted the following: City Council Resolution No. 2024-66, Vote:
5-0; City Council Resolution No. 2024-67, Vote: 5-0.

MEETING DATE: MAY 28, 2024 PAGE 2
SUBJECT: CIP NO. 8331 – FIRE STATION NO. 3 REPLACEMENT PROJECT – FIRST AMENDMENT TO THE AGREEMENT WITH ERICKSON-HALL CONSTRUCTION CO.
(GMP) with the DBT and recommends approval of the first amendment to establish the GMP of $15,149,181. The proposed amendment to the agreement with Erickson-Hall establishes the GMP and allows the DBT to begin Phase 2 construction services and Phase 3 operation/startup services as specified in Sections 6 and 7 of the original agreement (Exhibit 4).

Appropriation Request. The appropriation request is necessary due to a significant cost increase. The cost for off-site work items is significantly higher than estimated. The cost for undergrounding of overhead utilities, the traffic signal, the street improvements, and the water and sewer connections, increased from an estimated $1.27 million to a bid cost of $1.75 million.

The costs for labor and materials were higher than estimated. The bidding process to establish the GMP and the bid leveling process resulted in bids that were consistently higher in all of the trades. The plans are very complete, so the scope of work is well defined. The bid leveling process was reviewed in detail by the City’s construction management team to ensure that all of the work was included in the bids and that the best value bid was selected.

Based on conversations and information provided by the City of Oceanside and the City of San Diego, both of whom are currently proceeding with fire station projects, the construction management team believes the cost of labor and materials have increased significantly in the past two years. The City of San Diego stated they believe the cost has increased 50 percent over the last four years, and their budget for Fire Station No. 48 has increased from $22 million to $32 million in the past year. The City of Oceanside’s anticipated increase in cost is 25 percent.

In response to concerns about the increase in the GMP over prior estimates, Erickson-Hall prepared a list of value engineering items for consideration. A number of these items, that did not change the quality or the program for the project were implemented, and a savings of $257,859 was included in the GMP, as detailed in Exhibit “A” to the Amendment.

After all the analysis and comparison of fire station data from other local cities, the City’s construction management team believes that the GMP proposed by Erickson-Hall is fair and represents the current market. Therefore, staff recommends approval of the GMP included in the proposed contract amendment and proceeding with the project at this time.

FISCAL IMPACT: The cost of this amendment is $14,340,331 for a new contract ceiling of $15,149,181 for Erickson-Hall to provide design-build services for the Design and Construction of the Fire Station No. 3 Replacement Project Phase 2 and Phase 3. City Council approval of the staff recommendation will amend the Capital Project Budget for Fiscal Years 2022/23 and 2023/24 by authorizing the appropriations of $4,919,704 from available fund balance in the Underground Utility Fees, Fire Development Impact Fees, and Prop L Reserve accounts (Nos. 0010000.310526, 1100000.310525, and 0010000.310744).

EXHIBITS:

1.City Council Resolution No. 2024- , approving the first amendment to the agreement with Erickson- Hall Construction Co. for design/build services for the Fire Station No. 3 Replacement Project (CIP No. 8331)

2.City Council Resolution No. 2024- , amending the Capital Project Budget for Fiscal Years 2022/23 and 2023/24

3.First Amendment with Erickson-Hall Construction Co.

4.Original Contract with Erickson-Hall Construction Co.

5.Vicinity Map
05/28/2024 C6 2 of 262

00029213 7
RESOLUTION NO. 2024-

A RESOLUTION OF THE CITY COUNCIL OF THE CHARTERED CITY OF

VISTA, CALIFORNIA, APPROVING THE FIRST AMENDMENT TO THE AGREEMENT WITH ERICKSON-HALL CONSTRUCTION CO. FOR
DESIGN/BUILD SERVICES FOR THE FIRE STATION NO. 3 REPLACEMENT PROJECT (CIP NO. 8331)
The City Council of the City of Vista does resolve as follows:

1. Findings. The City Council hereby finds and declares the following:

A. On October 11, 2022, the City of Vista entered into an agreement with Erickson- Hall Construction Co. for design/build services for the Fire Station No. 3 Replacement Project (CIP No. 8331).

B. On December 12, 2023, the Zoning Administrator approved Zoning Administrator Resolution No. 2023-29, approved the Site Development Plan for Fire Station No. 3 and associated improvements, and found that pursuant to Section 15332 of the California Code of Regulations (CEQA Guidelines) the project is exempt from environmental review because it is an in-fill development project that meets the following five in-fill conditions of Class 32 exemptions: (a) it would be consistent with the applicable designations and policies of the City’s General Plan and Zoning Ordinance; (b) it would be developed within City limits on a site no more than five acres that is substantially surrounded by urban uses; (c) the project site does not contain any habitat for endangered, rare or threatened species; (d) approval of the project would not result in significant effects related to traffic, noise, air quality or water quality; and (e) the site can be adequately served by all required public utilities and services.

C, The City now desires to amend the agreement with Erickson-Hall Construction Co. to establish the Guaranteed Maximum Price (GMP) of $15,149,181.

2. Action.

A. The First Amendment to the agreement between the City of Vista and Erickson- Hall Construction Co. for design/build services for the Fire Station No. 3 Replacement Project establishing the Guaranteed Maximum Price (GMP) of $15,149,181 is approved, and the Mayor is authorized to execute the amendment.
05/28/2024 C6 3 of 262
EXHIBIT 1

00029213 7EXH 01 2024 Resolution template -COV (00029213-8xBECB1).docx RESOLUTION NO. 2024-

CITY COUNCIL OF THE CHARTERED CITY OF VISTA
PAGE 2

3.Adoption. PASSED AND ADOPTED at a meeting of the City Council of the City of Vista held on May 28, 2024, by the following vote:

AYES:

NOES:

ABSTAIN:

APPROVED AS TO FORM:

WALTER CHUNG, CITY ATTORNEY
By:

APPROVED
Walter C. Chung
20240520100955
JOHN B. FRANKLIN, MAYOR
ATTEST:

KATHY VALDEZ, CITY CLERK
By:
05/28/2024 C6 4 of 262

00029213 7
RESOLUTION NO. 2024-

A RESOLUTION OF THE CITY COUNCIL OF THE CHARTERED CITY OF

VISTA, CALIFORNIA, AMENDING THE CAPITAL PROJECT BUDGET FOR FISCAL YEARS 2022/23 AND 2023/24
The City Council of the City of Vista does resolve as follows:

1.Findings. The City Council hereby finds and declares the following:

A.On June 28, 2022, the City Council adopted Resolution 2022-108 approving the Six-Year Capital Improvement Program, the Capital Project Budget for Fiscal Years 2022/23 and 2023/24, and authorizing appropriations for Fiscal Years 2022/23 and 2023/24 capital projects.

B.The City Council desires to amend the Capital Project Budget at this time to reflect changed circumstances.

2.Action.

A.The Capital Project Budget for Fiscal Years 2022/23 and 2023/24 is amended as set forth in Exhibit A.

3.Adoption. PASSED AND ADOPTED at a meeting of the City Council of the City of Vista held on May 28, 2024, by the following vote:

AYES:

NOES:

ABSTAIN:

APPROVED AS TO FORM:

WALTER CHUNG, CITY ATTORNEY
By:

JOHN FRANKLIN, MAYOR
ATTEST:

KATHY VALDEZ, CITY CLERK
By:

APPROVED
Walter C. Chung
20240117140803
05/28/2024 C6 5 of 262
EXHIBIT 2

RESOLUTION NO. 2024-

CITY COUNCIL FOR THE CHARTERED CITY OF VISTA
PAGE 1 EXHIBIT A

1. Account Number Account Description Increase Decrease 1100000.310525 Fire Development Impact Fees 350,000$
1106576.578999.8331 Source Appropriation 350,000$
0010000.310526 Underground Utility Fees 529,272$
0026608.578999.8331 Source Appropriation 529,272$
0010000.310744 Prop L 4,040,432$
0026556.578999.8331 Source Appropriation 4,040,432$
0020090.482001 Transfer In from Fund 001 4,569,704.00$
0010900.590002 Transfer Out to Fund 002 4,569,704.00$
Appropriations are hereby made to fund Fire Station No. 3 Replacement Project (CIP No. 8331). 05/28/2024 C6 6 of 262

00098064 4

FIRST AMENDMENT TO THE CONTRACT BETWEEN THE CITY OF VISTA AND ERICKSON-HALL CONSTRUCTION CO. FOR DESIGN / BUILD
SERVICES FOR THE FIRE STATION NO. 3 PROJECT (CIP NO. 8331) THIS FIRST AMENDMENT (“First Amendment”) to the Contract between the City of Vista and Erickson-Hall Construction Co., dated October 11, 2022 (“Contract”), is made and entered into as of _______________________ (“First Amendment Date”), by and between the City of Vista, a chartered municipal corporation (“City”), and Erickson-Hall Construction Co, a California corporation (“Contractor”).

Recitals: City and Contractor now desire to enter into a First Amendment to the Contract by modifying the terms of the Contract.

NOW, THEREFORE, in consideration of these recitals and the mutual covenants contained herein, City and Contractor agree as follows:

1.The Guaranteed Maximum Price (GMP) for construction of Temporary Fire Station No 3 and permanent Fire Station No. 3, is hereby established as $15,149,181.00, which includes $808,850.00 in preconstruction and design services, in accordance with Section 1.3 of the Contract. A breakdown of the GMP is included as Exhibit A.

2.The construction schedule is established as set forth in Exhibit B.

3.The City Engineer is directed to approve the 100% construction documents prior to Written Notice to Proceed with Construction Services pursuant to Vista Municipal Code Section 2.30.020.B.

4.All other conditions of the Contract not specifically amended or superseded by the terms herein shall continue in full force and effect. [Text and signatures on following page.]
05/28/2024 C6 7 of 262
EXHIBIT 3

Contract Amendment

Page 2 ends

00098064 44875-8967-1866, v. 2
IN WITNESS WHEREOF, the parties have executed and entered into this First Amendment as of the First Amendment Date.

CITY OF VISTA, a chartered municipal
corporation
By:

JOHN B. FRANKLIN, MAYOR
ATTEST:

KATHY VALDEZ, CITY CLERK
By:

APPROVED AS TO FORM:

WALTER CHUNG, CITY ATTORNEY
By:

RISK MANAGEMENT REVIEW:

DOLORES GASCON, RISK MANAGER
By:

APPROVED
Amanda L. Guy
20240501100518
ERICKSON-HALL CONSTRUCTION CO.,
a California corporation
By:

NAME/Title
By:

NAME/Title
05/28/2024 C6 8 of 262

Erickson-Hall Construction Co.

GMP BREAKDOWN- 04/25/2024

EXHIBIT A
Erickson-Hall Construction Co.

Page 1 of 2 ends

#Vista Fire Station #3

BID DATE
3/7/2024
1 Erosion Control/SWPPP 62,723$
2 Survey 36,300$
3 Fence 292,492$
4 Asphalt 157,397$
5 Earthwork & Demolition 298,214$
6 Concrete & Reinforcing Steel 976,493$
7 Masonry 151,851$
8 Structural & Misc. Steel 254,816$
9 Rough Carpentry & Plaster & Ext. Clading 1,190,895$
10 Finish Carpentry & Casework 382,042$
11 Waterproofing, Insulation & Sealants 80,065$
12 Sheet Metal & Metal Wall Panels, Skylights 354,286$
13 Roofing 32,543$
14 Doors, Frames, and Hardware 476,805$
15 Glazing & Storefronts 66,450$
16 Drywall 319,918$
17 Ceramic Tile 77,590$
18 Acoustic Ceiling 32,100$
19 Flooring 91,170$
20 Painting 204,729$
21 Signage 48,700$
22 Division 10 Specialties 37,877$
23 Misc Specialties & Equipment 152,668$
24 Roller Shades & Elevator 252,557$
25 Fire Sprinklers 84,421$
26 Plumbing / Site Utilities 931,960$
27 HVAC 612,425$
28 Electrical / Low Voltage 1,845,555$
29 Landscape 234,700$
30 Final Clean 18,145$
31 Traffic Signal 371,174$
32 FF&E Allowance 75,000$
33 Solar Photovoltaic Allowance 369,818$
34 Temporary Fire Station 874,346$
35 Temporary Fire Station (Add/Cut)5,889$
36 Main Station Final SDG&E Design Changes 95,246$
37 Value Engineering Selected by Owner (257,859)$
38 SUBTOTAL 11,291,501$
39 Construction Contingency (3.5%)395,203$
40 General Conditions 851,567$
41 Site Specific Conditions (Tab 32)465,350$
42 Construction Administration (PBK Architects)121,000$ 43 SUBTOTAL 13,124,620$
44 OH & Profit (6%)787,477$
45 SUBTOTAL 13,912,097$
46 Liability Insurance (1%)139,121$
47 COC Insurance (1%)139,121$
48 SUBTOTAL 14,190,339$
49 Design & Preconstruction 808,850$
50 SUBTOTAL 14,999,189$
51 Bond (1%)149,992$
52 TOTAL DESIGN AND CONSTRUCTION 15,149,181$
05/28/2024 C6 9 of 262

Erickson-Hall Construction Co.

GMP CLARIFICATIONS - 04/25/24

EXHIBIT A - CONTINUED
The attached Vista Fire Station #3 - GMP Breakdown (Exhibit A) reflects the bid documents as listed below:

This GMP is based on the following documents:

A Vista Fire Station #3 Drawings, dated February 08, 2024.

B Vista Fire Station #3 Project Manual, dated February 2024 C Geotechnical Report by NOVA Services, dated December 12, 2022 D Addendum 01, dated February 26, 2024
E Bid Clarification 01, dated February 26, 2024
F Addendum 02, dated March 04, 2024
G Bid Clarification 02, dated March 04, 2024
H Polished/Stained concrete finish at Apparatus Bay floors included I Accepted Value Engineering Items dated 4/25/2024
WORK SCOPE CLARIFICATION ITEMS:

J Includes allowance for materials testing and inspections K City of Vista IT to provide expansion drive slots for CCTV, Local switch (POE), and patch panels.

L Radio antenna/cabling is an allowance, scope is unknown M Excludes traffic control permit cost
N Excludes encroachment permit cost
O Excludes grading and demolition permit cost
P Excludes building permit cost
Q Excludes utility company costs and fees
R Excludes audio visual equipment (Spec Section 27 41 00) S Excludes "nailable" insulation at roof, but we do include the 1.5" rigid insulation beneath metal roofing panels.

T Exercise Equipment, TV's, Sound System, BBQ, Mattresses, Trash Cans, Utensils, Pots, Pans, dishes, etc….

To be purchased from FF&E Allowance
U Exclude utility company meters, fees, etc…
V Liquid waterproofing behind solid surface shower walls in lieu of nobleseal roll product on plans X Radio, Antenna, Wiring, Cabling & Connections included as an allowance Y Excludes future Bid Clarification(s) for changes as a result of city plan check comments and final AHJ approval ACCEPTED VALUE ENGINEERING:

Value Engineering List
4/25/2024
#ACCEPTED VALUE ENGINEERING ITEMS Owner
Selected
1 Remove perforated panels at site fencing 83,895$
2 Remove anti-graffiti coating from perforated panels at site fencing 9,240$ 3 Remove fence and gate (G5) perpendicular to building at Electrical room 7,630$ 6 Remove casework requirements for Monitored Compliance & Certified Seismic Installation Program 8,000$ 8 Remove factory painting (pre-finish) of Hardie siding 24,095$ 9 Subsitute galvanized guardrail north of exercise room, in leiu of Stainless Steel 5,000$ 13 Reduce height of athletic flooring base at exercise room from 24" to 12"1,218$ 15 Substitute fiberglass batt insulation at interior walls and ceilings, in lieu of rock-wool 12,630$ 16 Substitute kraft faced batt insulation at exterior walls and ceilings, in lieu of FSK foil facing 9,050$ 17 Remove the tubular skylights 17,500$
19 Reduce restroom wall tile and change from 7' to 4' wainscot at toilet and urinal areas 18,894$ 21 Remove double skim coat at Level 5 Drywall finish, roll-applied final coat only 14,000$ 22 Remove anti-graffiti coating at interior yard side of masonry wall (not exposed to the public)2,459$ 23 Remove anti-graffiti coating at exterior building walls in secure area (not accessible to public)15,060$ 25 Substitute standard stucco color coat, in lieu of acrylic plaster 7,961$ 26 Remove painting of plaster 3,649$
30 Remove XHHW insulation on feeders 4,300$
31 Substitute Aluminum feeders, in lieu of copper 4,300$ 35 Remove conduit for HVAC thermostat control wiring in accessible ceiling spaces 3,235$ 39 Remove Plymovent crab return system from single deep app bays 5,743$ Total Value Engineering Items Selected by Owner 257,859$ Erickson-Hall Construction Co.

Page 2 of 2 ends

05/28/2024 C6 10 of 262

ID Task Name Duration Start Finish
1 CITY OF VISTA - FIRE STATION NO. 3 REPLACEMENT PROJECT 558 days Wed 9/20/23 Fri 12/5/25 2 TEMP FS - BID PHASE (1 OF 2)59 days Wed 9/20/23 Thu 12/14/23 3 REPLACEMENT FS - BID PHASE (2 OF 2)90 days Thu 2/8/24 Fri 6/14/24 4 PUBLIC BIDDING 20 days Thu 2/8/24 Thu 3/7/24
5 JOB WALK NON-MANDATORY 0 days Thu 2/15/24 Thu 2/15/24 6 RFI DEADLINE 0 days Fri 2/23/24 Fri 2/23/24
7 FINAL ADDENDUM 0 days Mon 3/4/24 Mon 3/4/24
8 BIDS DUE @ 2PM 0 days Thu 3/7/24 Thu 3/7/24
9 GMP Preparation 22 days Fri 3/8/24 Mon 4/8/24
10 GMP NEGOTIATIONS 16 days Tue 4/9/24 Tue 4/30/24
11 CITY COUNCIL APPROVAL - MAY 28TH 0 days Mon 4/8/24 Tue 5/28/24 12 NOTICE TO PROCEED ISSUED 0 days Wed 5/29/24 Wed 5/29/24 13 SUBCONTRACTING 12 days Thu 5/30/24 Fri 6/14/24
14 TEMP FS - CONSTRUCTION (3.5 MONTHS)78 days Mon 6/17/24 Fri 10/4/24 44 OWNER ACTIVITIES 5 days Fri 10/4/24 Thu 10/10/24
45 OWNER MOVE-IN TO TEMP STATION 1 day Fri 10/4/24 Fri 10/4/24 46 FIRE TRAINING EXERCISES 4 days Mon 10/7/24 Thu 10/10/24 47 REPLACEMENT FS - CONSTRUCTION (14 MONTHS)290 days Fri 10/11/24 Fri 12/5/25 48 MOBILIZE 10 days Fri 10/11/24 Thu 10/24/24
57 DEMO/GRADING 26 days Mon 10/21/24Tue 11/26/24
66 FOUNDATION/SOG 57 days Wed 11/27/24Thu 2/20/25
92 BUILDING STRUCTURE 74 days Fri 2/21/25 Thu 6/5/25
115 FINISHES 160 days Mon 4/21/25 Fri 12/5/25
157 OFF-SITE WORK 66 days Thu 5/15/25 Mon 8/18/25
173 SITE WORK 71 days Thu 6/19/25 Mon 9/29/25
210 SUBSTANTIAL COMPLETION 0 days Fri 12/5/25 Fri 12/5/25 CITY OF VISTA - FIRE STATION NO. 3 REPLACEMENT PROJECT 12/5 9/20 TEMP FS - BID PHASE (1 OF 2)
REPLACEMENT FS - BID PHASE (2 OF 2)6/14
2/8 PUBLIC BIDDING
JOB WALK NON-MANDATORY 2/15
RFI DEADLINE 2/23
FINAL ADDENDUM 3/4
BIDS DUE @ 2PM 3/7
3/8 GMP Preparation
4/9 GMP NEGOTIATIONS
CITY COUNCIL APPROVAL - MAY 28TH 5/28
NOTICE TO PROCEED ISSUED 5/29
5/30 SUBCONTRACTING
TEMP FS - CONSTRUCTION (3.5 MONTHS)10/4
OWNER ACTIVITIES 10/10
10/4 OWNER MOVE-IN TO TEMP STATION
10/7 FIRE TRAINING EXERCISES
REPLACEMENT FS - CONSTRUCTION (14 MONTHS)12/5
MOBILIZE 10/24
DEMO/GRADING 11/26
FOUNDATION/SOG 2/20
BUILDING STRUCTURE 6/5
FINISHES 12/5
OFF-SITE WORK 8/18
SITE WORK 9/29
SUBSTANTIAL COMPLETION 12/5
May Jun Jul AugSep OctNovDec Jan FebMarAprMayJun Jul AugSep Oct NovDec Jan FebMar AprMay Jun Jul AugSep OctNovDec Jan FebMar AprMay Jun Jul AugSep OctNovDec Jan FebMar Qtr 2, 2022 Qtr 3, 2022 Qtr 4, 2022 Qtr 1, 2023 Qtr 2, 2023 Qtr 3, 2023 Qtr 4, 2023 Qtr 1, 2024 Qtr 2, 2024 Qtr 3, 2024 Qtr 4, 2024 Qtr 1, 2025 Qtr 2, 2025 Qtr 3, 2025 Qtr 4, 2025 Qtr 1, 2026 2022 2023 2024 2025

EXHIBIT B
FIRE STATION NO. 3 REPLACEMENT (CIP 8331)

CONSTRUCTION SCHEDULE
Project Start: Wed 9/20/23
Project Finish: Fri 12/5/25
Data Date: Thu 4/25/24
Run Date: Thu 4/25/24

Page 1 of 1 ends

05/28/2024 C6 11 of 262

SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE

THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN ACCORDANCE WITH THE POLICY PROVISIONS.

INSURER(S) AFFORDING COVERAGE
INSURER F :

INSURER E :

INSURER D :

INSURER C :

INSURER B :

INSURER A :

NAIC #
NAME:CONTACT
(A/C, No):FAX
E-MAILADDRESS:

PRODUCER
(A/C, No, Ext):PHONE

INSURED
REVISION NUMBER:CERTIFICATE NUMBER:COVERAGES
IMPORTANT: If the certificate holder is an ADDITIONAL INSURED, the policy(ies) must have ADDITIONAL INSURED provisions or be endorsed.

If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s).

THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS

CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER, AND THE CERTIFICATE HOLDER.

OTHER:
(Per accident)
(Ea accident)
$
$
N / A
SUBR
WVD
ADDL
INSD

THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS

CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. $
$
$
$PROPERTY DAMAGE
BODILY INJURY (Per accident)
BODILY INJURY (Per person)

COMBINED SINGLE LIMIT

AUTOS ONLY

AUTOSAUTOS ONLY

NON-OWNED

SCHEDULEDOWNED

ANY AUTO

AUTOMOBILE LIABILITY
Y / N

WORKERS COMPENSATION

AND EMPLOYERS' LIABILITY
OFFICER/MEMBER EXCLUDED?
(Mandatory in NH)
DESCRIPTION OF OPERATIONS below
If yes, describe under

ANY PROPRIETOR/PARTNER/EXECUTIVE
$
$
$
E.L. DISEASE - POLICY LIMIT
E.L. DISEASE - EA EMPLOYEE
E.L. EACH ACCIDENT

EROTH-STATUTEPER

LIMITS(MM/DD/YYYY)POLICY EXP(MM/DD/YYYY)POLICY EFFPOLICY NUMBERTYPE OF INSURANCELTRINSR DESCRIPTION OF OPERATIONS / LOCATIONS / VEHICLES (ACORD 101, Additional Remarks Schedule, may be attached if more space is required)

EXCESS LIAB
UMBRELLA LIAB $EACH OCCURRENCE
$AGGREGATE
$
OCCUR

CLAIMS-MADE
DED RETENTION $
$PRODUCTS - COMP/OP AGG
$GENERAL AGGREGATE
$PERSONAL & ADV INJURY
$MED EXP (Any one person)
$EACH OCCURRENCE
DAMAGE TO RENTED $PREMISES (Ea occurrence)

COMMERCIAL GENERAL LIABILITY

CLAIMS-MADE OCCUR
GEN'L AGGREGATE LIMIT APPLIES PER:

POLICY PRO-JECT LOC

CERTIFICATE OF LIABILITY INSURANCE DATE (MM/DD/YYYY)

CANCELLATION

AUTHORIZED REPRESENTATIVE
ACORD 25 (2016/03)
© 1988-2015 ACORD CORPORATION. All rights reserved.

CERTIFICATE HOLDER
The ACORD name and logo are registered marks of ACORD
HIRED

AUTOS ONLY
9/1/2023
Alliant Insurance Services, Inc.
701 B Street, 6th floor
San Diego CA 92101
Susan Koelle
619-541-4851
[email protected]
License#: 0C36861 National Union Fire Insurance 19445
ERICCON-01 Illinois Union Insurance Compa 27960Erickson-Hall Construction Company 500 Corporate Drive
Escondido CA 92029-1353
New Hampshire Insurance Compan 23841
Navigators Insurance Company 42307
480907868
A X 1,000,000
X 300,000
10,000
1,000,000
2,000,000
X
Y Y 5856940 9/1/2023 9/1/2024
2,000,000
A 1,000,000
X
X X
X X
Y Y 5717908 9/1/2023 9/1/2024
Comp. Deductible 250
D X 10,000,000
X
LA23EXCZ0EUHDIV 9/1/2023 9/1/2024
10,000,000
PRODUCTS COMP. OP AGG 10,000,000
C XY0141958499/1/2023 9/1/2024
1,000,000
1,000,000
1,000,000
B Builders Risk-All Risk
Flood and Earthquake excluded I21058671 013 9/1/2023 9/1/2024 Per Occurrence Dedt. Per Occurrence
$40,000,000
$10,000
Coverage: Contractors Professional and Pollution Liability Carrier: AXIS Surplus Insurance Company
Policy Number: CM005110-02-2023
Policy Period: 9/1/2023 - 9/1/2024
Contractors Professional Liability: Each Claim Limit $3,000,000; Aggregate Limit $4,000,000; SIR Each Claim: $25,000 Contractors Pollution Liability: Each Claim Limit $5,000,000; Aggregate Limit $5,000,000; SIR Each Claim: $15,000 Re: #4224, Design / Build Services for the Fire Station #3 Project, CIP #8331.

City of Vista is included as Additional Insured, per project aggregate applies. Umbrella/Excess Liability follow form for General Liability and Business Auto.

City of Vista
200 Civic Center Drive
Vista CA 92084
05/28/2024 C6 12 of 262

05/28/2024 C6 13 of 262

05/28/2024 C6 14 of 262

05/28/2024 C6 15 of 262

05/28/2024 C6 16 of 262

05/28/2024 C6 17 of 262

05/28/2024 C6 18 of 262

05/28/2024 C6 19 of 262

05/28/2024 C6 20 of 262

05/28/2024 C6 21 of 262

05/28/2024 C6 22 of 262

05/28/2024 C6 23 of 262

05/28/2024 C6 24 of 262

05/28/2024 C6 25 of 262

05/28/2024 C6 26 of 262

05/28/2024 C6 27 of 262

05/28/2024 C6 28 of 262
EXHIBIT 4

05/28/2024 C6 29 of 262

05/28/2024 C6 30 of 262

05/28/2024 C6 31 of 262

05/28/2024 C6 32 of 262

05/28/2024 C6 33 of 262

05/28/2024 C6 34 of 262

05/28/2024 C6 35 of 262

05/28/2024 C6 36 of 262

05/28/2024 C6 37 of 262

05/28/2024 C6 38 of 262

05/28/2024 C6 39 of 262

05/28/2024 C6 40 of 262

05/28/2024 C6 41 of 262

05/28/2024 C6 42 of 262

05/28/2024 C6 43 of 262

05/28/2024 C6 44 of 262

05/28/2024 C6 45 of 262

05/28/2024 C6 46 of 262

05/28/2024 C6 47 of 262

05/28/2024 C6 48 of 262

05/28/2024 C6 49 of 262

05/28/2024 C6 50 of 262

05/28/2024 C6 51 of 262

05/28/2024 C6 52 of 262

05/28/2024 C6 53 of 262

05/28/2024 C6 54 of 262

05/28/2024 C6 55 of 262

05/28/2024 C6 56 of 262

05/28/2024 C6 57 of 262

05/28/2024 C6 58 of 262

05/28/2024 C6 59 of 262

05/28/2024 C6 60 of 262

05/28/2024 C6 61 of 262

05/28/2024 C6 62 of 262

05/28/2024 C6 63 of 262

05/28/2024 C6 64 of 262

05/28/2024 C6 65 of 262

05/28/2024 C6 66 of 262

05/28/2024 C6 67 of 262

05/28/2024 C6 68 of 262

05/28/2024 C6 69 of 262

05/28/2024 C6 70 of 262

05/28/2024 C6 71 of 262

05/28/2024 C6 72 of 262

05/28/2024 C6 73 of 262

05/28/2024 C6 74 of 262

05/28/2024 C6 75 of 262

05/28/2024 C6 76 of 262

05/28/2024 C6 77 of 262

05/28/2024 C6 78 of 262

05/28/2024 C6 79 of 262

05/28/2024 C6 80 of 262

05/28/2024 C6 81 of 262

05/28/2024 C6 82 of 262

05/28/2024 C6 83 of 262

05/28/2024 C6 84 of 262

05/28/2024 C6 85 of 262

05/28/2024 C6 86 of 262

05/28/2024 C6 87 of 262

05/28/2024 C6 88 of 262

05/28/2024 C6 89 of 262

05/28/2024 C6 90 of 262

05/28/2024 C6 91 of 262

05/28/2024 C6 92 of 262

05/28/2024 C6 93 of 262

05/28/2024 C6 94 of 262

05/28/2024 C6 95 of 262

05/28/2024 C6 96 of 262

05/28/2024 C6 97 of 262

05/28/2024 C6 98 of 262

05/28/2024 C6 99 of 262

05/28/2024 C6 100 of 262

05/28/2024 C6 101 of 262

05/28/2024 C6 102 of 262

05/28/2024 C6 103 of 262

05/28/2024 C6 104 of 262

05/28/2024 C6 105 of 262

05/28/2024 C6 106 of 262

05/28/2024 C6 107 of 262

05/28/2024 C6 108 of 262

05/28/2024 C6 109 of 262

05/28/2024 C6 110 of 262

05/28/2024 C6 111 of 262

05/28/2024 C6 112 of 262

05/28/2024 C6 113 of 262

05/28/2024 C6 114 of 262

05/28/2024 C6 115 of 262

05/28/2024 C6 116 of 262

05/28/2024 C6 117 of 262

05/28/2024 C6 118 of 262

05/28/2024 C6 119 of 262

05/28/2024 C6 120 of 262

05/28/2024 C6 121 of 262

05/28/2024 C6 122 of 262

05/28/2024 C6 123 of 262

05/28/2024 C6 124 of 262

05/28/2024 C6 125 of 262

05/28/2024 C6 126 of 262

05/28/2024 C6 127 of 262

05/28/2024 C6 128 of 262

05/28/2024 C6 129 of 262

05/28/2024 C6 130 of 262

05/28/2024 C6 131 of 262

05/28/2024 C6 132 of 262

05/28/2024 C6 133 of 262

05/28/2024 C6 134 of 262

05/28/2024 C6 135 of 262

05/28/2024 C6 136 of 262

05/28/2024 C6 137 of 262

05/28/2024 C6 138 of 262

05/28/2024 C6 139 of 262

05/28/2024 C6 140 of 262

05/28/2024 C6 141 of 262

05/28/2024 C6 142 of 262

05/28/2024 C6 143 of 262

05/28/2024 C6 144 of 262

05/28/2024 C6 145 of 262

05/28/2024 C6 146 of 262

05/28/2024 C6 147 of 262

05/28/2024 C6 148 of 262

05/28/2024 C6 149 of 262

05/28/2024 C6 150 of 262

05/28/2024 C6 151 of 262

05/28/2024 C6 152 of 262

05/28/2024 C6 153 of 262

05/28/2024 C6 154 of 262

05/28/2024 C6 155 of 262

05/28/2024 C6 156 of 262

05/28/2024 C6 157 of 262

05/28/2024 C6 158 of 262

05/28/2024 C6 159 of 262

05/28/2024 C6 160 of 262

05/28/2024 C6 161 of 262

05/28/2024 C6 162 of 262

05/28/2024 C6 163 of 262

05/28/2024 C6 164 of 262

05/28/2024 C6 165 of 262

05/28/2024 C6 166 of 262

05/28/2024 C6 167 of 262

05/28/2024 C6 168 of 262

05/28/2024 C6 169 of 262

05/28/2024 C6 170 of 262

05/28/2024 C6 171 of 262

05/28/2024 C6 172 of 262

05/28/2024 C6 173 of 262

05/28/2024 C6 174 of 262

05/28/2024 C6 175 of 262

05/28/2024 C6 176 of 262

05/28/2024 C6 177 of 262

05/28/2024 C6 178 of 262

05/28/2024 C6 179 of 262

05/28/2024 C6 180 of 262

05/28/2024 C6 181 of 262

05/28/2024 C6 182 of 262

05/28/2024 C6 183 of 262

05/28/2024 C6 184 of 262

05/28/2024 C6 185 of 262

05/28/2024 C6 186 of 262

05/28/2024 C6 187 of 262

05/28/2024 C6 188 of 262

05/28/2024 C6 189 of 262

05/28/2024 C6 190 of 262

05/28/2024 C6 191 of 262

05/28/2024 C6 192 of 262

05/28/2024 C6 193 of 262

05/28/2024 C6 194 of 262

05/28/2024 C6 195 of 262

05/28/2024 C6 196 of 262

05/28/2024 C6 197 of 262

05/28/2024 C6 198 of 262

05/28/2024 C6 199 of 262

05/28/2024 C6 200 of 262

05/28/2024 C6 201 of 262

05/28/2024 C6 202 of 262

05/28/2024 C6 203 of 262

05/28/2024 C6 204 of 262

05/28/2024 C6 205 of 262

05/28/2024 C6 206 of 262

05/28/2024 C6 207 of 262

05/28/2024 C6 208 of 262

05/28/2024 C6 209 of 262

05/28/2024 C6 210 of 262

05/28/2024 C6 211 of 262

05/28/2024 C6 212 of 262

05/28/2024 C6 213 of 262

05/28/2024 C6 214 of 262

05/28/2024 C6 215 of 262

05/28/2024 C6 216 of 262

05/28/2024 C6 217 of 262

05/28/2024 C6 218 of 262

05/28/2024 C6 219 of 262

05/28/2024 C6 220 of 262

05/28/2024 C6 221 of 262

05/28/2024 C6 222 of 262

05/28/2024 C6 223 of 262

05/28/2024 C6 224 of 262

05/28/2024 C6 225 of 262

05/28/2024 C6 226 of 262

05/28/2024 C6 227 of 262

05/28/2024 C6 228 of 262

05/28/2024 C6 229 of 262

05/28/2024 C6 230 of 262

05/28/2024 C6 231 of 262

05/28/2024 C6 232 of 262

05/28/2024 C6 233 of 262

05/28/2024 C6 234 of 262

05/28/2024 C6 235 of 262

05/28/2024 C6 236 of 262

05/28/2024 C6 237 of 262

05/28/2024 C6 238 of 262

05/28/2024 C6 239 of 262

05/28/2024 C6 240 of 262

05/28/2024 C6 241 of 262

05/28/2024 C6 242 of 262

05/28/2024 C6 243 of 262

05/28/2024 C6 244 of 262

05/28/2024 C6 245 of 262

05/28/2024 C6 246 of 262

05/28/2024 C6 247 of 262

05/28/2024 C6 248 of 262

05/28/2024 C6 249 of 262

05/28/2024 C6 250 of 262

05/28/2024 C6 251 of 262

05/28/2024 C6 252 of 262

05/28/2024 C6 253 of 262

05/28/2024 C6 254 of 262

05/28/2024 C6 255 of 262

05/28/2024 C6 256 of 262

05/28/2024 C6 257 of 262

05/28/2024 C6 258 of 262

05/28/2024 C6 259 of 262

05/28/2024 C6 260 of 262

05/28/2024 C6 261 of 262

^_
^_
E

V
i
s
t
a

W
y
Tay lo r St
O ld T a y l o r S t
E Ta y l o r S t
Arcadia Av
A u tu mn L n
Larkhill Dr
LagunaDr
TemporaryFire Station1250 Arcadia Ave
VistaFire Station No. 31070 Old Taylor St
Project Vicinity Map 0 125 250
Feet±
05/28/2024 C6 262 of 262