Department: City Manager
® CITY COUNCIL
❑ COMMUNITY DEVELOPMENT COMMISSION
❑ SUCCESSOR AGENCY
❑ BUENA SANITATION DISTRICT
❑ JOINT POWERS FINANCING AUTHORITY
Item No: D1
Cassidy McCarthy, CAP Program Administrator
Prepared by: Joshua Sino Cruz, Assistant to the City Mgr. Meeting Date: October 3, 2024 Imelda Huerta, Assistant City Manager
Approved by: John Conley, City Manager Agenda Location: Workshop SUBJECT: CLIMATE ACTION PLAN IMPLEMENTATION UPDATE
RECOMMENDATION: Discuss the implementation progress on the City's Climate Action Plan and provide direction to staff.
CORRELATION TO CITY COUNCIL GOALS: A Cleaner, More Beautiful Vista; Climate and Environmental Responsibility; Traffic
PRIOR ACTION: On August 27, 2024, adopted City Council Resolution No. 2024-142, accepting grant funds from CalTrans Sustainable Transportation Grant and amending the Capital Project Budget for Fiscal Years 2024-25 and 2025-26. (Vote 5-0) On June 25, 2024, adopted City Council Resolution No. 2024-109, approving an agreement with Par Western Line Contractors, LLC for design/build services for the City -Wide Electric Vehicle Charging Stations Project (CIP no. 8902). (Vote 4-0, Green absent) On June 11, 2024, received an update on the Street Lighting Assessment Project and directed staff to install solar lights in the identified 66 locations, allocate the remainder of the funds for additional solar lights, and organize a community workshop for input on potential locations of lights around residential, commercial, and parks. Directed City Attorney to investigate recourse against SDG&E. (Vote 5-0)
Please see Exhibit 1 for a Comprehensive List of Prior City Council Actions.
STATEMENT ON THE SUBJECT: The City of Vista's Climate Action Plan (CAP) was first adopted in 2012 and updated in 2021. The CAP provides a comprehensive roadmap to reduce greenhouse gas (GHG) emissions and address the challenges of climate change in the city. In general, a CAP is a long- range plan that outlines specific strategies to reduce GHG emissions. The City of Vista's CAP sets a baseline for past and current GHG emissions, includes forecasts of future emissions, and establishes targets to help California, and the community reduce future emissions. In the long term, the CAP will also help achieve multiple community goals such as improving air quality, enhancing safety, reducing heat island effect, and improving public health and the quality of life.
The CAP identifies 7 strategies and 13 measures to help the City reach its GHG reduction goals:
ACTION:
Clerk/Secretary
10/03/2024 D 1 Page 1 of 145
MEETING DATE: OCTOBER 3, 2024
PAGE 2
SUBJECT: CLIMATE ACTION PLAN IMPLEMENTATION UPDATE
(Climate Action Plan Document — Table 4-2 Implementation Strategy Matrix) Responsible Staff
Implementation Ease of
Measure Title Category Department) Implementation
Agency Timeframe Costs Implementation
9 cY
Strategy 1: Increase Use of Zero-Emission1A1ter1ka11ve Fuel Vehicles T-1
Transition to a Clean and More Fuel-
Efficient Municipal Vehicle Fleet
Municipal Operations
PW
Mid -Term
_o,v
Low
T-2
Increase EV Charging Stations at Public
Municipal Operations
CD; PW
Short -Term
_aVv
Medium
Facilities
TA
Require EV Charging Stations at New
New Ordinances and Code Updates
BD; CD
Mid -Term
_CV.,
Medium
Multi -Family and Commercial
Developments
Strategy 2: Reduce Vehicle Miles Traveled
T-4
Participate in the SANDAG's iCommute
Partnerships; Education and Outreach
CM; CD
Ongoing
LoVv
Low
Vanpool Program
T-5
Implement the City s. Bicycle Master
Planning
CD, ENG
Ongoing
Medium
Medium
Plan
T-5
Increase Density and Mixed -Use
Planning
CM; CD
L ;ng-e•m
Medium
High
Development
Strategy 3: Reduce Fossil Fuel Use
T-7 Require Electric -Powered or Alternative New Ordinances and Code Updates BD; CD Short -Term Low Low Fueled Construction Equipment
Strategy4: Increase Building Energy Efficiency
E-1 Implement Energy Efficient Projects in Municipal Operations PW Mid -Term Medium Medium Municipal Facilities
Responsible Staff
Implementation Ease of
Measure Title Category Department) Implementation
Agency Timeframe Costs Implementation
9 cY
Strategy 5: Increase Renewable and Zero -Carbon Energy
E-2
Continue PV Installation at Municipal
Municipal Operations
PW, ENG
Ongoing
_a�v
Lo,;
Facilities
E-3
Join a Program to Increase Grid -Supply
Financ -•g and Incentives; Partnersr os:
CM
Long -Term
High
High
Renewable and Zero -Carbon Electricity
Education and Outreach
Strategy 6: Reduce and Recycle Solid Waste
W-1 Reduce Solid Waste Disposal and New Ordinances and Code Updates; :1W Mid -Term Vedium High Increase Recycling Partnerships
Strategy 7: Carbon Sequestration
C-1
Increase Tree Planting at Municipal
Municipal Operations, Partnerships
PW
Short -Term
_o+r:
Medium
Facilities and Public Rights -of -Way
C-2
Increase Tree Planting at New Private
New Ordinances and Code Updates;
CD; PW
Short -Term
_a%v
Medium
Properties
Education and Outreach
Notes: BD = Building Division; CD = Community Development Department; CM = City Manager's Office; ENG = Engineering Department; EV = electric vehicle; PV = Photovoltaic; PW = Public Works Department; SANDAL = San Diego Association of Governments Source: Ascent Environmental 2019.
Earlier this year, staff had created an implementation monitoring report for the Climate Action Campaign (Exhibit 2). The breakdown of CAP measure progress in the monitoring report has been updated with the most current information detailed below. Staff will update the monitoring report after this workshop, incorporating Councils' direction, and then publish the report on the City's website for public access. 10/03/2024 D 1 Page 2 of 145
MEETING DATE: OCTOBER 3, 2024 PAGE 3
SUBJECT: CLIMATE ACTION PLAN IMPLEMENTATION UPDATE
At the last CAP Update Workshop on October 5 2023, Council asked staff for a full update on every CAP measure, and the information presented below includes data collected from 2020 to the current date.
While the CAP was updated in 2021, all data projections and measures were established from 2019 data, therefore, including 2020 in the progress and success of the measures is appropriate for data collection and reporting.
Lastly, the City has not received a completed and up to date GHG Inventory from SANDAG since 2019 which reported on data from 2016 (Exhibit 3). The GHG Inventory that SANDAG provided to the City in 2023 (Exhibit 4) was incomplete due to the impacts of COVID-19 on SANDAG's modeling system, but did include some updates with 2021 data. SANDAG has informed local jurisdictions who rely on this reporting to track the progress/effectiveness of the CAP measures that they will not be providing these GHG inventories any longer. However, staff will ensure that an updated GHG inventory is included in the next CAP update.
Strategy 1 — Increase Use of Zero-Emission/Alternative Fuel Vehicles Measure T-1: Transition to a Clean and More Fuel -Efficient Municipal Vehicle Fleet • Goal: Replace 47 vehicles to EV or PHEV by 2030
• Description from CAP:
o Replace non-public safety vehicles (e.g., passenger cars and light -duty gasoline trucks) that are scheduled for replacement with electric or alternative fuel vehicles, including EVs and PHEVs.
Background:
o The City currently has 130 total vehicles in its fleet. Of those, 87 are considered non-public safety vehicles and 20 of them are considered passenger cars. Per the EPA, a light duty gasoline truck or vehicle is a vehicle that weighs less than 10,000 lbs. Out of the 67 other non-public safety vehicles, 43 of them could be considered a light -duty vehicle; however, since they have additional equipment installed on them, they are categorized as a midsize to heavy duty vehicle. When these vehicles are over 10,000 lbs., they are no longer considered a light duty vehicle and, therefore, replacing them would not help the City reach this goal.
Since 2020, the City has been able to replace 4 of our fleet passenger vehicles with EV's.
Every vehicle in the City's fleet has an approximate seven-year replacement schedule with a budget tied to that scheduled replacement. However, the City's normal practice is to keep vehicles longer than seven years if they are in good working condition and have low milage.
In the next coming fiscal year, one vehicle is in the class and scheduled to be transitioned to an EV or Plug In Hybrid Electric Vehicle (PHEV) .
Progress on this measure has been difficult due the availability of adequate replacements for our current fleet needs from vehicle manufacturers, and the cost and availability of passenger EV and PHEVs. In addition, with only one level 2 charger at the Civic Center and one level 2 charger at the Public Works yard, each of which can only charge two vehicles, the City does not currently have the infrastructure in place to transition all of their vehicles to EV or PHEV. With the citywide EV charging project (see Measure T-2 below), an additional eight level two dual port chargers will be installed at the Public Works yard exclusively for the City's fleet use.
The California Air Resources Board (CARB) Advanced Clean Fleets regulation that was adopted in April 2023 applies to many different fleets, including those that are owned by 10/03/2024 D 1 Page 3 of 145
MEETING DATE: OCTOBER 3, 2024
PAGE 4
SUBJECT: CLIMATE ACTION PLAN IMPLEMENTATION UPDATE
local government. This regulation requires fleet operators to transition all of their non-public safety fleet, including heavy duty and specialty vehicles, to 100% Zero Emission Vehicles no later than 2045. It should be noted that any PHEV purchased to reach the CAP goal, is not in line with this regulation because the requirement is for zero emissions and PHEV's still have emissions.
• Goal Status-
o In Progress
Next Steps:
o Achieving this target will depend on advancements in electric vehicle technology and more affordable pricing, making the transition to an EV fleet more practical and feasible. Our Fleet team has been working with other cities and attending workshops hosted by the California Air Resources Board to come up with solutions to not only meet our CAP goal but also the state mandate of having 100% of our fleet to be zero emissions by 2045. Staff is prepared to follow the Milestones option from CARB which commits the City to phasing in Zero Emission Vehicles into the fleet between 2025 and 2042 depending on the type of vehicle and usage, as provided below.
Percentage of vehicles that must be ZEVs
Milestone Group 1: Box trucks, vans, buses with two axles, yard tractors, light -duty package delivery vehicles
Milestone Group 2: Work trucks, day cab tractors, pickup trucks, buses with three axles
Milestone Group 3: Sleeper cab tractors and specialty vehicles 100lo 25% 50% 75% 100%
2025 2028 2031 2033 2035and
beyond
2027 2030 2033 2036 2039and
beyond
2030 2033 2036 2039 2042and
beyond
Staff will continue to search for any grant or funding opportunities that help local governments transition their fleet to EV's or installing more EV charging stations to support a full electric fleet.
Measure T-2: Increase Electric Vehicle Charging Stations at Public Facilities • Goal: Install 20 public EV charging stations by 2030
• Description from CAP:
o Install Level 2 or better EV charging stations at city -owned facilities (e.g., downtown public parking areas and Civic Center) available for public use.
Background:
o Currently the City has one level two charger at public works, one level two charger at the Civic Center, and two level two chargers at the public parking lot on the corner of E.
Broadway and Citrus. Each of these chargers can charge two cars at once, however, they charge a car at roughly 25 miles per hour rate. Additionally, the chargers available for public use are the chargers located at the noted public parking. 10/03/2024 D 1 Page 4 of 145
MEETING DATE: OCTOBER 3, 2024
PAGE 5
SUBJECT: CLIMATE ACTION PLAN IMPLEMENTATION UPDATE
Staff are actively working on CIP project #8902, which plans to increase the number of EV charging stations at public facilities across the city. This project's Request for Proposals (RFP) for the design build phase was approved by council in June 2024, and it plans to install 90 EV chargers at various public locations. The current proposed plan is to install 14 level three direct current fast chargers, which will charge a car at a roughly 200 miles per hour rate, and 76 level two chargers, which will charge a car at a roughly 28 miles per hour rate. The 12 public facility sites that have been identified for this project are Civic Center, Public Works, Fire Stations 5 & 6, Wave Waterpark, Brengle Terrace Park, the Broadway & Citrus Parking Lot, Sports Park, Breeze Hill Park, Luz Duran Park, Bub Williamson Park, and Shadowridge Park. For locations that already have chargers, the chargers from this plan will replace/upgrade the current chargers as part of the total 90 installations. The project is expected to be completed by 2026 and is currently at a 30% design, and the City's contractors are working with SDG&E on new service applications for seven of the sites.
• Goal Status:
o In Progress - Goal will be met and/or surpassed by 2030.
Next Steps:
o Staff will continue to keep council updated on progress with CIP #8902 as we move forward with the project. Staff is also currently working on additional grants to supplement funding for the project.
Measure T-3: Require Electric Vehicle Charging Stations at New Multi -Family and Commercial Developments
• Goal: Install 188 new EV charging stations at new multi -family developments by 2030 and Install 108 new EV charging stations at new commercial developments by 2030. • Description from CAP:
o Require that three percent of total parking spaces required in new multi -family projects have EV charging stations, and six percent of total parking spaces required in new commercial projects have EV charging stations, starting in 2021.
Background:
o The City does not currently have any requirements that exceed the State's requirements for EV charging at new developments. The CALGreen requirements that came into effect July 2024 for EV chargers at new multifamily, hotels and motels is that 40% of their parking spaces need to have access to low power level 2 receptacles (where the user provides their own external charging cable), and 10 percent of their parking spaces have level 2 electric vehicle supply equipment or charging station. For non-residential or commercial new developments CALGreen requires anywhere from 0 percent to 25 percent of the parking spaces are either EV Capable (wired for a charger) or EV Ready (with charging equipment) depending on the size of the development. There are also other requirements that specify that certain nonresidential building types like grocery, retail, warehouse, manufacturing, or office need to have at least one EV Charger and a minimum number of high output level 2 chargers.
The current process for tracking the number of EV chargers that are installed at private developments is triggered when a developer or property owner pulls a permit through the Community Development department; however, there is no differentiation between new or existing developments. Based off permits that have been issued since 2020 for either EV 10/03/2024 D 1 Page 5 of 145
MEETING DATE: OCTOBER 3, 2024
PAGE 6
SUBJECT: CLIMATE ACTION PLAN IMPLEMENTATION UPDATE
chargers or Solar Installation with EV chargers, there have been at total of 143 chargers installed at private developments, either new or existing. Of the 143 chargers, 63 were installed in commercial developments, 64 were installed in residential developments, and 16 were installed in multifamily developments.
• Goal Status'
o In Progress
• Next Steps:
o This goal is directly related to the volume of new developments and while progress is ongoing, the number of new developments will influence the ability to meet the 2030 goal.
Staff is currently monitoring state code regulations.
Strategy 2 — Reduce Vehicle Miles Traveled
Measure T-4: Participate in the San Diego Association of Government's iCommute Vanpool Program • Goal: Maintain a minimum of 18 SANDAG vanpools annually that start or end in the city. • Description from CAP:
o Promote and encourage participation in SANDAG's iCommute Vanpool Program by businesses in the city.
Background:
o SANDAG's iCommute program has been rebranded to SANDAG's Sustainable Transportation Services, and they still offer a Vanpool program through commute with Enterprise or Green Commuter. Through this program, SANDAG offers businesses a monthly subsidy of $500 to $600 to run a carpooling commuter van to and from their businesses. This allows for businesses to offer an alternative commuting benefit to their employees while also promoting carpooling. Currently there are 13 vanpools that are either starting or ending in Vista, which are either run by Commute with Enterprise or Green Commuter and can be subsidized by SANDAG.
Staff have advertised the program to Vista businesses through the Economic Development Newsletter and have started to evaluate internally with our Human Resources department and Commute with Enterprise to provide this benefit to City employees. • Goal Status:
o In Progress - Likely that goal will be met by 2030 deadline. • Next Steps:
o The next steps are to continue to promote this program with SANDAG Sustainable Commutes and the Economic Development team. In addition, to implement one or two vanpools that are for City employee benefit.
Measure T-5: Implement the City's Bicycle Master Plan
• Goal: Install an additional 12 miles of two-way bicycle lanes (Class II or better) by 2030. 10/03/2024 D 1 Page 6 of 145
MEETING DATE: OCTOBER 3, 2024
PAGE 7
SUBJECT: CLIMATE ACTION PLAN IMPLEMENTATION UPDATE
• Description from CAP:
o Implement projects identified in the City's Bicycle Master Plan, including adding new bicycle lanes and improving existing bicycle lanes. Support the SANDAG Regional Bicycle Plan Inland Rail Trail segment that is within the City's boundary.
Background:
o The Bicycle master plan was developed and published in 2014 and created a Citywide Bicycle Network with a prioritization list of projects. These projects involved implementing new or improving current bicycle infrastructure, and were prioritized based on criteria related to demand, safety, and feasibility of implementation. Adding bicycle lanes requires additional traffic studies and can require restriping or road widening to allow for enough space to add a fully separated bike lane. The City has added separated bike lanes on North Avenue/W Los Angeles Drive/Townsite Drive from East Drive to E. Vista Way as a part of the Townsite Complete Streets Project. This project added 2.2 miles of bike lanes and is anticipated to be completed by the end of the year.
Additionally, staff have been working on improving the safety of the current infrastructure by implementing green bicycle lanes (Exhibit 5). Since 2020, the City has implemented green paint along both sides of the 7-mile stretch of Melrose within City limits, the 2.5 miles for Vista Village Drive/East Vista Way from the 78 to Taylor Street, and the 1.3-mile stretch of N. Santa Fe from Vista Village Drive to Bobier Drive.
• Goal Status:
o In Progress
Next Steps:
o The City plans to continue adding the green paint to existing bike lanes along W. Vista Way, Olive Avenue, W. Bobier Drive, S. Santa Fe Avenue from Civic Center Drive to the City border, on Business Park Drive from Sycamore to Poinsettia, and on Live Oak, Lupine Hills and Shadowridge Drive (please reference Exhibit 6). This will add an approximate 20 additional miles of green bike lane infrastructure, totaling about 30 miles throughout the City.
Staff are also working on implementing protected bike lanes on the City's major roads in the next few months. These protected bike lanes will be implemented where Class II bike lanes already exist on major roads and do not add new bike facilities where they did not previously exist. Staff recently submitted a grant application to carry out a comprehensive update to the current bicycle master plan.
Lastly, the next section of SANDAG's Inland Rail Trail that extends from Mar Vista Drive to Civic Center Drive has started construction as is expected to be complete by 2027. Once this one -mile section is complete, SANDAG is scheduled to begin construction on the final two-mile section within Vista from Civic Center Drive to North Avenue (Exhibit 7).
Measure T-6: Increase Densitv and Mixed -Use Development • Goal: Complete the Vista Palomar and Vista Melrose 47 projects • Description from CAP:
o Increase density and destination accessibility in the Opportunity Areas identified in the General Plan and the SANDAG Smart Growth Areas.
10/03/2024 D 1 Page 7 of 145
MEETING DATE: OCTOBER 3, 2024
PAGE 8
SUBJECT: CLIMATE ACTION PLAN IMPLEMENTATION UPDATE
Background:
o Both the Vista Palomar and Vista Melrose 47 projects have been completed. The Vista Melrose 47 project is a 47-unit condominium development at 1630 S. Melrose Drive that has open space amenities, landscaping, and associated improvements. This development amended the General Plan to change the land use designation from Rural Residential and Commercial to Mixed Use. The Vista Palomar project is a 100-room hotel and 191 condominium unit development at 2100 W. San Marcos Boulevard that has open space amenities, landscaping, and associated improvements. This development amended the General Plan to change the land use designation from Research Light Industrial to Mixed Use.
• Goal Status:
o Complete - Goal is met and could be surpassed by 2030. • Next Steps:
o The current General Plan Update for 2050 focuses on increasing mixed use and density within the City's core areas. This will help boost this measure within the CAP by making it easier for developers to add higher density developments to areas with greater access to public transit and amenities.
Strategy 3 — Reduce Fossil Fuel Use
Measure T-7: Require Electric -Powered or Alternative Fueled Construction Equipment • Goal: Require that 30% of construction equipment in new development projects be electric - powered or alternatively fueled
• Description from CAP:
o Require the use of alternative fuel or electric -powered construction equipment in new development projects.
Background:
Currently, the city does not have an ordinance or requirement for developers to use a certain percentage of electric or alternatively fueled construction equipment for any kind of development. In addition, the City does not have any policy on how to enforce the use of specific equipment onsite. Staff is unaware of any state regulations or requirements for developers to use specific equipment, or of any other local jurisdictions that currently have regulations on alternatively fueled construction equipment. However, the City is already implementing this goal to the Maximum Extent Practicable by including a "Standard Environmental Conditions" section in their Conditions of Approval language for discretionary projects, which reads as follows:
"The following actions shall be implemented throughout construction to minimize emission of 03 precursors (NOx and VOCs):
a) Turn off all diesel -powered vehicles and gasoline -powered equipment when not in use for more than five minutes.
b) Use electric or natural gas -powered construction equipment in lieu of gasoline or diesel -powered engines, where feasible.
c) Require 10% of construction fleet use any combination of diesel catalytic converters, diesel oxidation catalysts, diesel particulate filters, and /or GARB -certified Tier III equipment or better.
d) Support and encourage ridesharing and transit incentives for the construction crew." 10/03/2024 D 1 Page 8 of 145
MEETING DATE: OCTOBER 3, 2024
PAGE 9
SUBJECT: CLIMATE ACTION PLAN IMPLEMENTATION UPDATE
• Goal Status-
o In Progress/Not Feasible
• Next Steps:
o Achieving this goal will depend on future advancements in electrical construction equipment, state law, and local initiatives. Staff will continue to monitor state laws and regulations as well as what other cities are doing to decrease emissions in off -road transportation.
Strategy 4 — Increase Building Energy Efficiency
Measure E-1: Implement Energy Efficient Projects in Municipal Facilities • Goal: Complete energy efficiency projects identified in the 2018 energy audit that will reduce municipal facility energy use by 1 million kWh by 2030. • Description from CAP:
o Implement energy efficiency projects (i.e., interior and exterior lighting retrofits and HVAC system adjustments) identified in the 2018 energy audit conducted for the Civic Center, Public Works Department, Wave Water Park, Fire Stations, and Recreation Center.
Background:
o The 2018 energy audit (Exhibit 8) called for nine lighting and mechanical energy efficiency projects at Public Works, the Civic Center and the Wave Waterpark. These projects include:
1. Replace and retrofit exterior fixtures with new LED fixtures and retrofit kits
2. Replace and retrofit interior fluorescent troffers with new LED fixtures and LED retrofit kits
3. Replace and retrofit recessed can CFLs with recessed can LED retrofit kits
4. Upgrade fluorescent MR16 lamps to LED MR16 lamps
5. Upgrade non-incentivized miscellaneous lighting to LED
6. Implement Advanced Lighting Controls at Civic Center
7. Install variable frequency drives on Wave Water Park pool pumps
8. Optimal Start/Stop HVAC
9. Implement Occupancy -Based Zone Setback Controls for HVAC The City has completed projects one through five and project seven. Projects six, eight and nine were implemented prior to the audit. In addition to the LED upgrades at Public Works, the Civic Center and the Wave Waterpark, staff upgraded the interior and exterior lighting to LED at the Jim Porter Recreation Center, and all fire stations. • Goal Status-
o Complete - Goal is met and could be surpassed by 2030.
Next Steps:
o At this time this goal is met, with extra effort toward the goal being made with the energy efficiency upgrades that have occurred at additional city facilities. Staff will continue to pursue energy efficiency projects with all new facility upgrades and maintenance. In addition, staff will continue to research grants that could benefit energy efficiency in other ways at city facilities.
10/03/2024 D 1 Page 9 of 145
MEETING DATE: OCTOBER 3, 2024
PAGE 10
SUBJECT: CLIMATE ACTION PLAN IMPLEMENTATION UPDATE
Strategy 5 — Increase Renewable and Zero -Carbon Energy Measure E-2: Continue Photovoltaic Installation at Municipal Facilities • Goal: Install 400 kW new behind -the -meter PV at city facilities by 2030. • Description from CAP:
o Complete photovoltaic (PV) installation at the Public Works Yard carports and identify additional PV Installation Opportunities at other city facilities.
Background:
o The PV installation at Public Works has been completed, which included solar panels added to the two carports as well as on the roof of the new administrative building. Staff has not currently documented the energy production from this project but are currently working with the contractor to obtain the energy conservation data. In addition to this project, there are currently solar panels at the Senior Center, which were installed in 2010, and have produced 697.483 kW since installation.
In terms of upcoming solar projects at city facilities, staff are currently working on a solar project for the Civic Center as well as Fire Station 3. The Civic Center project plans to add solar carports above the Alta Vista Parking lot, which will provide 621 kW behind -the -meter PV. This project will require the parking lot to be closed for 6 months and its estimated date of completion is March 2025. The Fire Station 3 project is in design and the estimated power output for the project based on a model run is 35kW. This project is estimated to be completed by December 2025.
In addition, in June 2024 City Council directed staff to install solar streetlights in 66 locations within the city, which is in addition to 12 pilot locations. These lights are energy efficient, less expensive than traditional electric streetlights, and align with the City's climate action goals. • Goal Status:
o In Progress - Goal will be met and/or surpassed by 2030.
Next Steps:
o With the completion of the Civic Center project, the goal will be reached and exceeded, and with the completion of the Fire Station 3 project and the solar streetlight project, the City is committing to adding PV at more city facilities. Staff will continue to pursue grants and other opportunities to add solar to city facilities, including researching battery storage potential.
Measure E-3: Join a Program to Increase Grid -Supply Renewable and Zero -Carbon Electric • Goal: Achieve 90 percent renewable or zero -carbon electricity by 2030 • Description from CAP:
o Join a program to increase grid -supply renewable and zero -carbon electricity beyond the RPS mandate for 2030.
• Background:
o As of April of this year, the City of Vista is officially enrolled with Clean Energy Alliance which offers three different renewable energy options. The City Council has elected to opt up to 100 percent renewable energy for all city facilities and operations. In addition, Council voted to enroll all of Vista's residents and businesses in 50 percent renewable with 75 10/03/2024 D 1 Page 10 of 145
MEETING DATE: OCTOBER 3, 2024
PAGE 11
SUBJECT: CLIMATE ACTION PLAN IMPLEMENTATION UPDATE
percent carbon free energy. Currently, Vista has a 96.4 percent participation rate with 66 percent of customers opting down to 50 percent renewable energy, and 0.7 percent customers opting up to 100 percent renewable energy.
With 96.4 percent of the city running on at least 50 percent renewable energy and the 260 customers who have opted up to 100 percent renewable energy, the City is on a good path to reach the goal laid out in the CAP of 90 percent renewable or zero -carbon electricity by 2030.
• Goal Status:
o In Progress — Likely that goal will be met by 2030.
• Next Steps:
o The next steps to reach this goal are to continue to provide outreach and education to our residents and businesses and encourage them to opt -up to 100 percent renewable energy with Clean Energy Alliance. In addition, one of Council's 2024-2026 goals is to ensure a high enrollment rate in the Clean Energy Alliance program.
Strategy 6 — Reduce and Recycle Solid Waste
Measure W-1 Reduce Solid Waste Disposal and Increase Recycling • Goal: Achieve 85 percent waste diversion citywide (equivalent to reducing per capita waste landfilled to two lbs. per person) by 2030.
• Description from CAP:
o Work with waste haulers to set citywide solid waste reduction and recycling goal Background:
o Staff have been working with our waste hauler, EDCO, as well as other organizations, including I Love a Clean San Diego, Solana Center and the Vista Chamber of Commerce to educate the public and keep Vista in compliance with state law. While the City is in compliance with state law, Vista's current total diversion rate is 25.9 percent. For each sector individually the diversion rates are residential at 46.4 percent, commercial at 11.7 percent, and roll -off at 15.1 percent. Details are included in Exhibits 9 and 10.
EDCO has been providing ongoing customer support, education, and community presentations, and sends out regular customer newsletters. They also provide route inspections to identify concerns, alert customers and provide related educational materials.
They provide individual site reviews for commercial accounts to help right size containers and educate customers on organic waste diversion. In addition, I Love a Clean San Diego holds an annual "Save Your Scraps" workshop for Vista residents to learn about food waste reduction, proper waste stream separation and composting. They also held an organic waste recycling workshop at the library in the last year and had several webinars over the past couple of years.
Lastly, staff are working with Solana Center for Environmental Innovation for the City's food recovery programming. Solana Center is providing education and technical assistance related to food waste reduction, edible food recovery, recycling, and organics waste diversion to all identified Food Recovery Organizations and Tier 1 and 2 food waste generators. Currently there are 50 commercial edible food generators and 11 food recovery services and/organizations located within Vista. In 2023, 1,292,910 pounds of 10/03/2024 D 1 Page 11 of 145
MEETING DATE: OCTOBER 3, 2024
PAGE 12
SUBJECT: CLIMATE ACTION PLAN IMPLEMENTATION UPDATE
edible food was recovered from food generators by these food recovery services and organizations.
• Goal Status:
o In Progress
Next Steps:
o While achieving 85 percent waste diversion by 2030 presents challenges, efforts are ongoing to move toward this target. Staff rely heavily on our contractors and partners to help educate our businesses and residents about proper disposal. Staff will continue to work with our partners to ensure compliance in state law and is continuing to explore initiatives to help boost the City's diversion rate.
Strategy 7 — Carbon Sequestration
Measure C-1: Increase Tree Planting at Municipal Facilities and Public Rights -of Way • Goal: Plant an average of 100 trees annually through 2030 (1,300 net new trees by 2030). • Description from CAP:
o Develop a program to track tree planting and maintenance at city facilities, public parks, and public rights -of -way
Background:
o Since 2020, the City of Vista has planted 871 trees at various city facilities, public parks, and public rights -of -way across the city. The majority of these trees were able to be planted through grant funding assistance and coordination with UrbanCorp. The City currently has a Street Tree Master Plan that was published in 2007, which recommended priorities for tree plantings in the public right of way on residential and arterial streets. Currently the City's contractor, West Coast Arborists, assist staff in maintaining and tracking the 16,000- tree inventory in the city along with the 5,000 vacant sites suitable for a street tree. • Goal Status:
o In Progress — Likely that goal will be met by 2030 deadline.
Next Steps:
o Staff will continue to focus on tree planting and with future park and public space redevelopment. Staff anticipates the City will reach its goal by 2030. The current future redevelopment list is:
■ N. Santa Fe Drive Re -Development
• Will plant around 125 trees in median and along both sides of N. Santa Fe with irrigation
■ Inland Rail Trail Development
■ Avenida de La Plaza & Avendia de Benito Juarez Park Development ■ Hacienda & Matagual Park Development
■ Breeze Hill Park Development
■ Wiivay Park Development
Staff is continuing to work on new policies and initiatives, like incorporating planting street trees into the Residential Tree Giveaway Program, to help the city reach and exceed this goal.
10/03/2024 D 1 Page 12 of 145
MEETING DATE: OCTOBER 3, 2024 PAGE 13
SUBJECT: CLIMATE ACTION PLAN IMPLEMENTATION UPDATE
Measure C-2: Increase Tree Planting at New Private Properties • Goal: Plant an average of 500 new trees annually at new developments through 2030 (5,500 net new trees by 2030)
• Description from CAP:
o Enforce the new development tree requirements from landscape plans and track the new trees planted
Background:
o The City updated it's landscape manual in 2022 to require one tree per every 4-6 parking spots depending on the development type. Staff researched all landscape plans that had been approved since 2020 and have found that 2,266 trees have been planted at new developments; 1,231 have been planted at Commercial Developments, 951 have been planted at Multifamily Developments, and 84 have been planted at Residential Developments.
• Goal Status:
o In Progress — Likely that goal will be met by 2030 deadline. • Next Steps:
It is likely the City will meet this goal as staff continue to encourage and require additional tree planting where possible at new developments as part of their landscaping plans.
The progress above reflects the work that has been done to directly address Vista's CAP measures, however there are multiple City projects and programs that have been ongoing which indirectly support CAP measures and GHG reduction efforts.
Residential Tree Giveaway Program
The residential tree giveaway program started on Earth Day, April 22, 2024. The purpose of the program is to increase local tree canopy on private properties, improve wildlife habitat, and mitigate the effects of climate change. This program is funded by an allocation of $50,000 from the year end fund balance of Fiscal Year 2023-2024 by the City Council. The program provides trees or pollinator plants free of charge to City of Vista residents, either by delivery, a voucher, or a reimbursement program. There is an approved list of trees which includes native trees, regionally friendly trees, utility friendly trees, fruit trees, and pollinator plant options (Exhibit 11, page 6) which was modeled after the SDG&E tree rebate program list and was approved by the City's Public Works Team. The program is open to City of Vista residents who own the property they reside in or have approval from the property owner to plant an Approved Plant at their residence. The program also limits one approved plant per residential address and does not obligate the City to provide a replacement plant if the plant received fails to thrive.
The tree giveaway program has been successful with over 300 applicants, out of which 257 have been approved, and currently 236 trees have been delivered/picked up by residents. Out of the trees received, over half of them have been from the fruit tree options. For a full break down and summary of the current status of the tree program, please reference Exhibit 11, page 7. All approved participants are required to follow the Tree Planting Guidelines, take the Tree Steward Pledge and follow the Young Tree Best Care Practices listed in the Program Policy (Exhibit 11, page 1). As a note, the Tree Planting Guidelines exclude planting the tree in any public right-of-way. To confirm the trees have been planted, all tree program recipients are also required to send a photo of their planted tree to the City. 10/03/2024 D 1 Page 13 of 145
MEETING DATE: OCTOBER 3, 2024 PAGE 14
SUBJECT: CLIMATE ACTION PLAN IMPLEMENTATION UPDATE
The majority of the denied applicants are from residents who live in the county, and not within City limits.
When county residents apply, they are directed to the SDG&E tree rebate program where they will be able to be reimbursed for a tree if they are still interested in a free tree.
While this program does not directly influence the implementation of CAP Measure C-2 (Planting on New Private Property), it does support the underlying purpose of increasing Vista's tree canopy. Staff plans to continue to advertise this program to the public and believes there is enough funding to last the program through Earth Month 2025, after which more funding will need to be allocated to continue to the program.
Ash Can Program
The Ash Can program started in January of 2024 with the donation of three cigarette butt cannisters (ash cans) by the Surfrider Foundation. These ash cans help mitigate tobacco waste litter in the areas where it is most frequently found. The City's Community Improvement team has been servicing the three Ash Cans every week and has recorded their use since their installment in March 2024 (Exhibit 12, page 17).
The success for the three Ash Cans led to staff exploring other options and now the City is partnering with I Love a Clean San Diego to have 15 additional Ash Cans posted in the high foot traffic areas of the City.
Staff utilized the support of summer interns to monitor three routes in the City over a three week period in summer, 2024, where each route passed by a suggested location from either City Council, the Environmental Commission, or Vista Community Clinic. The interns notated locations that had continuous tobacco waste after being cleaned up weekly. At the August Environmental Commission meeting, the locations that had continuous tobacco waste were presented to the Commission and they voted to add the Ash Cans at the locations listed on Exhibit 12, page 16. The 15 that are provided from I Love a Clean San Diego will be installed, serviced, and maintained by their Cigarette Litter Ambassadors. The three that the City owns will still be serviced and maintained by the Community Improvement Team. Staff plans to continue to monitor the program and work with Public Works, Stormwater Programs, and the Communications team to further advertise this program to decrease litter.
While this program does not directly influence the implementation of CAP measure W-1 (Reducing Solid Waste) it does support a Cleaner Vista and promote education on proper disposal of hazardous materials.
Polystyrene Ban & Single Use Plastics Reduction Program At the end of 2023, Staff sent a letter to all food service providers with a Vista Business License educating the businesses about the Polystyrene (or Styrofoam) Ban and the Single Use Plastics Reduction Program.
Currently in Vista, no food service providers (restaurants, cafes, grocery stores etc.) should be providing their customers polystyrene products with prepared food (food or drinks that are prepared by the food service provider that are ready to be consumed). In addition, no food service providers should be providing their customers with single use foodware (including straws, forks, condiment packets) unless the customer requests them.
Both ordinances are complaint -based and require a resident to formally submit a notice to the city that a local food service provider is not obeying the ordinances. Starting in August of 2024, residents can now submit their complaint/report a business via the Access Vista App, prior to which residents had to email or call the city to report a business. When a business is reported, staff provides businesses education and outreach and gives them 30 days to enact a compliance plan. Staff also notifies the business if they are applicable for the 6-month waiver (if they gross less than $1 million a year). If the business is non- responsive or refuses to comply with the ordinances, they are then referred to Code Enforcement.
Since the fall of 2023 the city has received 13 reports of food service providers who are violating the Municipal Code, with 12 for serving Styrofoam products and one for providing single use foodware without request. In addition, there are currently 3 active waivers for businesses who required more time to comply with the ordinances or transition away from polystyrene products. Staff has only had to engage Code 10/03/2024 D 1 Page 14 of 145
MEETING DATE: OCTOBER 3, 2024 PAGE 15
SUBJECT: CLIMATE ACTION PLAN IMPLEMENTATION UPDATE
Enforcement with one business, and Code Enforcement confirmed they had transitioned away from polystyrene products following enforcement.
Staff plan to continue to provide education and outreach to businesses regarding these ordinances through work with the Economic Development team, the Communications team, and partnering with the Chamber of Commerce. While this program does not directly influence the implementation of CAP measure W-1 (Reducing Solid Waste), it does support a Cleaner Vista as well as increasing recycling as businesses transition to recyclable plastic or compostable paper takeout containers.
San Diego Regional Green Business Network
In 2024, Staff initiated a partnership with the San Diego Regional Green Business Network, which is a free consulting program provided by the San Deigo Green Building Council. The partnership helps businesses adopt environmentally sustainable practices through targeted outreach and certification. Green businesses implement practices that focus on energy efficiency, water conservation, and waste reduction to help reduce costs of operation and fight climate change. Currently, two Vista businesses have become certified through the Green Business Network, and one Vista business is in the process of becoming certified. To boost these numbers, staff are fostering a connection between the San Diego Regional Green Business Network and the Vista Chamber of Commerce. In addition, staff have worked with the Economic Development team to promote the network through newsletters.
This program promotes education and outreach to businesses on how their practices can impact the environment through water and energy use, the transportation options to their facilities, use of toxic chemicals, and their recycling and waste practices.
E-Bike Safety and Rebate Program
The E-Bike Safety & Rebate Program began in June of 2024, with the purpose of promoting safe and sustainable transportation options and enhancing community awareness of bike safety for Vista residents.
The City of Vista partnered with the San Diego County Bicycle Coalition to conduct both virtual and in person bike safety training classes. The program has been successful with 100 participants and $2,200 of rebates being distributed to Vista residents to -date.
In addition, staff have been working with Vista Unified School District (VUSD) since the winter of 2023 to promote VUSD's bike safety program. All students who ride their bike to school must have a permit that VUSD issues them after they participate in an hour-long bike safety class. VUSD promotes the city's current safety trainings to families and coordinated with staff to ensure students who participate receive credit toward their permit.
This program supports Strategy 2, which is to reduce vehicle miles traveled.
Events — Earth Month & Cyclovia
Staff has worked to boost public awareness of the City's environmental programs through several outreach events. Two that have been predominately focused on the city's sustainability efforts are staff's participation in the Alta Vista Botanical Gardens Earth Day festival in April of 2024 as well as the City's inaugural Cyclovia Vista Event in September of 2024. Each of these events were centered around public awareness of the City's sustainability efforts as well as the programs the city offers for its businesses and residents.
Grants
Since the CAP Implementation Update last year, staff have been working on securing more grant funding for more CAP and Sustainability related projects. Below is a list of all grants the city has been awarded, that are pending, or possible viable options:
10/03/2024 D 1 Page 15 of 145
MEETING DATE: OCTOBER 3, 2024
PAGE 16
SUBJECT: CLIMATE ACTION PLAN IMPLEMENTATION UPDATE
Awarded:
• IPM Alliance grant: Develop/implement sustainable IPM plan- includes education and outreach $167,203
• USDA, Urban and Community Forest program- trees and irrigation on N. Santa Fe from Vista Village to Bobier $1,593,798
• CalRecycle SB 1383- organics $266,591
• Caltrans Sustainable Transportation Planning Grant- City-wide sustainable transportation planning. $400,000
Pending:
• ICARP Urban Tree Management Plan $250,000 requested
• FEMA AFG- Source Capture Exhaust Extraction Systems $269,300 requested • DOT FHWA — 90 EV Charging Stations on city owned property $1,440,000 requested • Caltrans ATP- City-wide ATP $752,000 requested
Upcoming grant opportunities:
• SANDAG SGIP- CAP update amount to be determined.
Environmental Commission
The final program being implemented by staff is the new Environmental Commission. The Commission started in April of 2024 with the purpose of promoting and supporting the City's climate and environmental responsibility goals and advising the City Council and the City Manager on matters related to environmental health, environmental conservation, environmental justice, and environmental sustainability in the city. The Commission has met 6 times so far this year and have been advising on the several climate action initiatives, and created a Workplan (Exhibit 13), as well as received reports from the City's Stormwater Team, the City's Arborist, and CEA. As the Commission grows and develops, staff will bring new programs and initiatives to the Commission for approval and their recommendations to City Council.
FISCAL IMPACT: There are no direct fiscal impacts associated with the staff recommendation.
EXHIBITS:
1. Prior City Council Actions
2. Vista's CAP Implementation Monitoring Report March 2024
3. 2019 ReCAP GHG Inventory (2016 Data)
4. 2020 ReCAP GHG Inventory (Incomplete Data)
5. 2024 Bicycle Infrastructure Map
6. Existing and Future Green Bike Lanes Map
7. Inland Rail Trail Factsheet & Map
8. Vista's 2018 Energy Audit Report
9. Vista's Annual Tonnage Report 2023
10. Vista's CalRecycle Compliance Report 2023
11. Tree Program
12. Ash Can Program
13. Environmental Commission Work Plan 2024-2026
10/03/2024 D 1 Page 16 of 145
OCTOBER 3, 2024 CITY COUNCIL WORKSHOP
CAP Implementation Update
Prior City Council Actions
On August 27, 2024, adopted City Council Resolution No. 2024-142, accepting grant funds from CalTrans Sustainable Transportation Grant and amending the Capital Project Budget for Fiscal Years 2024-25 and 2025-26 (Vote 5-0).
On June 25, 2024, adopted City Council Resolution No. 2024-109, approving an agreement with Par Western Line Contractors, LLC for design/build services for the City -Wide Electric Vehicle Charging Stations Project (CIP no. 8902) (Vote 4-0, Green absent).
On June 11, 2024, received an update on the Street Lighting Assessment Project and directed staff to install solar lights in the identified 66 locations, allocate the remainder of the funds for additional solar lights, and organize a community workshop for input on potential locations of lights around residential, commercial, and parks. Directed City Attorney to investigate recourse against SDG&E (Vote 5-0).
On May 28, 2024, adopted City Council Resolution No. 2024-66, approving the first amendment to the agreement with Erickson -Hall Construction Co. for design/build services for the Fire Station No. 3 Replacement Project (CIP No. 8331) and adopted City Council Resolution No. 2024-67 amending the Capital Project Budget for Fiscal Years 2022/2023 and 2023-2024 (Vote 5-0).
On May 28, 2024, established a Preferred Land Use Alternative by selecting Sustainable Focused Growth Alternative (Vote 4-1, Franklin opposed).
On May 14, 2024, received an update on the Street Lighting Assessment project and provided direction to staff to: begin pilot program of 12 solar streetlights; continue to work with SDG&E to evaluate 45 exiting wood electrical poles for new streetlights; initiate design and construction of 21 new concrete pole electric streetlights; and return to the City Council within 30 days to report:
(1) options for retrofitting traditional concrete poles with solar power; (2) ability to connect solar streetlights to electrical power; and (3) experience of the City of Los Angeles solar light program (Vote 4-0, Green absent).
On May 14, 2024, discussed and provided input on the ashcan pilot program and directed staff to have the Environmental commission help develop a plan to expand and evaluate the program (No Vote Taken).
On April 9, 2024, discussed and approved the proposed a -bike safety training course with an affiliated rebate program (Vote 5-0).
On March 23, 2024, confirmed appointments to the Environmental Commission (Vote 4-0, Melendez absent).
On March 12, 2024, discussed the status of City facilities and provided direction to staff (No Vote Taken).
On January 23, 2024, adopted City Council Resolution No. 2024-11, approving a contract with Kimley-Horn and Associates, Inc. for the design of the Emeral Drive Complete Streets Improvement Project (CIP No. 8357) (Vote 5-0).
10/03/2024 D 1 Page 17 of 145
On January 9, 2024, opened, conducted, and closed a public hearing to receive testimony regarding amending Chapter 10.68 of the Vista Municipal Code regarding bicycles and introduced and adopted City Council Ordinance No. 2024-1, entitled "An Ordinance of the City Council or the Chartered City of Vista, California, amending Chapter 10.68 of the Vista Municipal Code regarding bicycles" (Vote 5-0).
On December 12, 2023, adopted City Council Resolution No. 2023-205, awarding a construction contract to Fordyce Construction, Inc. for the 2023 Pedestrian Mobility Sidewalk Project - Avenida De Benito Juarez from W. California Avenue to W. Connecticut Ave. (CIP No. 8290) (Vote 5-0).
On November 14, 2023, opened, conducted and closed a public hearing to receive public testimony regarding the Clean Energy Alliance default power supply selection and adopted City Council Resolution No. 2023-200, setting the Clean Energy Alliance default power supply option within the jurisdiction of the City of Vista to "Clean Impact Plus - 50% Renewable and 75% Carbon Free Energy." and adopted City Council Resolution No. 2023-201, setting the Clean Energy Alliance power supply option for city -owned facilities and operations to "Green Impact - 100% Renewable Energy" (Vote 5-0).
On November 14, 2023, introduced and adopted City Council Ordinance No. 2023-13, adding Chapter 2.50 to the Vista Municipal Code to establish an Environmental Commission (Vote 5-0).
October 5, 2023, discussed the status of the City's Climate Action Plan and provided direction to staff (No Vote Taken).
On September 26, 2023, discussed the formation and provided direction to staff to form an Environmental Commission (Vote 5-0).
On September 7, 2023, discussed City -owned properties that are vacant or underdeveloped, and provided direction to staff (No vote taken).
On August 22, 2023, adopted City Council Resolution No. 2023-154, approving an Agreement with Baker Electric & Renewables, LLC for design/build services for the Civic Center Solar Project (CIP No. 8334) (Vote 5-0).
On June 13, 2023, City Council Resolution No. 2023-90, awarding a contract to NV5, Inc. for as - needed engineering survey services (Vote 5-0).
On December 13, 2022, adopted City Council Resolution No. 2022-188, amending the Operating Budget for Fiscal Years 2021/22 and 2022/23, and amending the Capital Project Budget for Fiscal Years 2022/23 and 2023/24 (Vote 5-0).
On November 15, 2022, City Council Resolution No. 2022-168, approving application(s) for specified grants from the Budget Act of 2022/23 (Vote 5-0).
On October 10, 2022, City Council Resolution No. 2022-151, awarding a contract to STC Traffic, Inc. for the City Lighting Assessment and Consulting services (Vote 4-0, Green absent).
On June 28, 2022, adopted City Council Resolution No. 2022-113, authorizing the execution of the Joint Exercise of Powers Agreement for membership in the Clean Energy Alliance, a Community Choice Aggregation Joint Powers Authority, and allowing Mayor's appointment of a member and alternate member to the Board of Directors of the Clean Energy Alliance; and 10/03/2024 D 1 Page 18 of 145
introduced and adopted City Council Ordinance 2022-9, obtaining the City Council's decision, pursuant to Public Utilities Code section 366.2 (c)(12), to implement a Community Choice Aggregation Program within thew jurisdiction of the City of Vista by participating in the Clean Energy Alliance, under the terms and conditions provided in the Joint Powers Agreement (Vote 5-0).
On June 28, 2022, adopted City Council Resolution No. 2022-108, approving a Six Year Capital Improvement Program and FYs 2022/23 and 2023/24 Capital Project Budget and authorizing appropriations for Fiscal Years 2022/23 and 2023/24 Capital Projects (Vote 4-0, Ritter absent (Ritter experienced technical difficulties)).
On May 3, 2022, by consensus, supported the City joining the Clean Energy Alliance, a Community Choice Energy (CCE) Program, and directed staff to begin working on the application requirements (No Vote Taken).
On March 8, 2022, City Council Resolution No. 2022-27, awarding a contract to Biglione Construction Management, Inc. for as -needed construction management services for fire stations and general building renovations (Vote 5-0).
On September 28, 2021, adopted City Council Resolution no. 2021- 168, amending the Operating Budget for Fiscal Years 2021/ 22 and 2022/ 23 (Vote 3- 2, Contreras and Melendez opposed).
On September 14, 2021, adopted City Council Resolution No. 2021-140, amending the Operating Budget for Fiscal Years 2021/ 22 and 2022/ 23, with the revised appropriation of the$ 275, 000 allocated for one Sheriff's Deputy to the Lighting Landscape and Maintenance line item (Vote 3-0, Ritter and Green absent).
On August 24, 2021, discussed priorities for allocating excess cannabis revenues and approved funding for the following: 1) cannabis decoy and enforcement operations, 2) youth cannabis prevention and early intervention, 3) youth scholarships, 4) increased lighting in neighborhoods, 5) increased park restroom maintenance and 6) addition of one Sheriff's deputy and two Park Directors/ Enforcers (Vote on items 1- 5, 5- O; Vote on item 6: 3- 2, Contreras and Melendez opposed).
On June 1, 2021, held a workshop to discuss the Climate Action Plan (CAP) Update and the findings of the CCA Technical Feasibility Study and directed staff to finalize the CAP Update and further evaluate governance structure options for the formation of a CCA and report back to the City Council (Vote 5-0).
On June 25, 2019, approved a request for proposals (RFP) for CCA and directed staff to release the RFP, subject to approval of the partner cities of San Marcos and Escondido (Vote 5-0).
On April 9, 2019, staff discussed the policy recommendations in the Climate Action Plan Update.
The City Council directed staff to move forward with the Climate Action Plan Update and prepare a request for proposals to evaluate the feasibility of CCA for review by the City Council (Vote 5- 0).
On August 28, 2018, received a staff report on the Climate Action Plan Update and, by consensus, supported staff efforts and direction, particularly related to increasing the City's tree canopy, and directed staff to bring additional details and associated costs to a future meeting (No Vote Taken). 10/03/2024 D 1 Page 19 of 145
On March 13, 2018, received a staff report on the process of updating the Climate Action Plan with the City Council (No Vote Taken).
On December 10, 2013, adopted City Council Resolution No. 2013- 171, approving an Addendum to the Vista 2030 General Plan Update Program Environmental Impact Report, and City Council Resolution No. 2013- 172, adopting the Climate Action Plan (Vote 4- 1, Campbell opposed). 10/03/2024 D 1 Page 20 of 145
V, s
C A L I F 0 R N I A
•fir - �`.. '•�;., y�'ti
t
Climate Action Plan Annual
Monitoring Report @)
March zoz4
CITY OF VISTA
C A L I F 0 R N I A
:1019:4K9]&W191it9:
ExecutiveSummary....................................................................3 Greenhouse Gas Inventory.........................................................8 Progress Per Measure.................................................................9 Equity& Jobs.............................................................................15 Energy...........................................................................9............16 Transportation & Land Use........................................................17 Zero Waste & Trees....................................................................19 City of Vista Annual Climate Action Plan Monitoring Report 2024 12 10/03/2024 D 1 Page 22 of 145
Executive Summary
The City of Vista (City) developed its 2021 Climate
Action Plan (CAP) to serve as a comprehensive roadmap
that outlines the specific activities to reduce greenhouse gas (GHG) emissions and the potential impacts of
climate change within the City. The CAP is consistent
with and complementary to statewide legislation and
regulatory mandates and establishes locally based
strategies and measures that will not only reduce GHG
emissions, but also improve the livability and quality of life in the city.
Implementation of the CAP requires ongoing
management, oversight, and collaboration, ensuring that measures translate to real GHG emissions reductions.
Successful implementation requires investment, long-
term commitments, and widespread community
participation.
Monitoring CAP measures is an important part of
ensuring the success of the CAP in achieving the City's 2030 reduction target. The City monitors progress
towards the 2030 goal by participating in SANDAG's
biennial update of its local GHG inventory. City staff
provides periodic updates to the City Council on CAP
implementation and efforts. The City will again update
the CAP in alignment with the 2050 General Plan Update, to ensure CAP measures remain implementable and
feasible, adjusting measures based on changing
conditions or demands, and incorporating new
technology not considered in the previous CAPs.
Ongoing partnerships between community
residents, businesses, property owners, the City, and
other agencies and organizations in the region are
essential for successful implementation. On a
communitywide level, individuals and businesses can
play an important role in reducing GHG emissions by
changing habits to produce less waste or using
alternative modes of transportation.
City of Vista Annual Climate Action Plan Monitoring Report 2024 13 10/03/2024 D 1 Page 23 of 145
Executive Summary
Achieving the 2030 reduction targets requires implementation of the reduction strategies and measures identified in the CAP. The Monitoring Report builds upon Chapter 4 of the CAP, "Implementation and Monitoring," and outlines how the City has been implementing CAP measures. Implementation of certain strategies and measures requires the City to develop new ordinances, programs, and plans, or modify existing ones. This requires careful consideration of the operational and capital resources needed, in addition to staff resources, timing, phasing, and monitoring of implementation.
GHG reduction strategies included in the CAP span a variety of activity sectors; the CAP implementation process is a collaborative and inter -departmental City effort with various departments taking primary or secondary responsibility for the implementation of specific measures. In 2024, a Climate Action Working Group was established to have an internal common place for city departments to collaborate and share information on CAP implementation progress.
This report is currently a working document, and will not be officially published until the fall of 2024, during City Council Workshop. This will coincide with the annual CAP Update City Council Workshop, the first of which was held in October of 2023. The previous workshop did not have a monitoring report to go along with it but did have a staff report as well as went over city projects that supported ongoing CAP implementation efforts. All information from the previous update can be found online, and the recording of the workshop can be found here:
https://www.youtube.com/watch?v=HYPgXU7gel E
City of Vista Annual Climate Action Plan Monitoring Report 2024 14 10/03/2024 D 1 Page 24 of 145
Executive Summary
The 2021 CAP Update modeled citywide
emissions projects based on a continuation of
current trends in activity, population, and job
growth. The city met its 2020 emissions
reduction target under Business As Usual
conditions, but to meet the City's 2030 reduction
target, the goals of the measures listed in the
2021 CAP Update will need to be reached. These
goals can be supplemented by other climate
friendly actions as well to achieve even higher
emissions reductions.
z
w
J
E5
a
w
N W
N
00 U-0
O
U) --
z
O
O
LU
w
X
GHG Reduction Targets
700,000
600,000
500,000
400,000
300,000
200,000
100,000
0 603,000
521,000
350,000
2012 (baseline) 2020 2030
BASELINE & TARGETS BY YEAR
J
----------------------------------------------------------------------------------------------------------------------
CAP MEASURE PROGRESS
Completed In Progress Not Started
As of March of 2024, the City of Vista has achieved the goals of two measures, is in progress with ten measures, and has not started one measure. Out of the ten that are in progress, five of them are on schedule, two of them are awaiting resources, and three of them require more data to be gathered to determine if they are on schedule or will need to await more resources. When a measure's goal is in progress but awaiting resources, that means that there might not be the technology or funds available to complete the goal quickly, however there is still progress being made on the goal at a slower pace. The one measure that has yet to be started will be started by the end of 2024, it has not been started yet due to staff availability. Table 1 on the next two pages is a quick summary of each measure, discussed more in the Progress Per Measure section of this report.
City of Vista Annual Climate Action Plan Monitoring Report 2024 15 10/03/2024 D 1 Page 25 of 145
Executive Summary
Table 1 Measure Summary
Responsible Staff
Implementation Ease of
Measure Title Category Department/ Implementation
Timeframe Implementation
Agency Costs
9 Y
Strategy 1: Increase Use of
Zero-Emission/Alternative Fuel Vehicles
Transition to a Clean and
Municipal
T-1
More Fuel -Efficient
PW
Mid -Term
Low
Low
Municipal Vehicle Fleet
Operations
Increase EV Charging
Municipal
T-2
Stations at Public
Operations
CD; PW
Short -Term
Low
Medium
Facilities
Require EV Charging
New
T-3
Stations at New Multi-
Ordinances
BD; CD
Mid -Term
Low
Medium
Family and Commercial
and Code
Developments
Updates
Strategy 2: Reduce Vehicle Miles Traveled
Participate in the
Partnerships;
T-4
SANDAG's iCommute
Education
CM; CD
Ongoing
Low
Low
Vanpool Program
nd
Outreach
T-5
Implement the City's
Planning
CD, ENG
Ongoing
Medium
Medium
Bicycle Master Plan
T-6
Increase Density and
Planning
CM; CD
Long -Term
Medium
High
Mixed -Use Development
Strategy 3: Reduce Fossil
Fuel Use
Require Electric -Powered
New
T-7
or Alternative Fueled
Ordinances
BD; CD
Short -Term
Low
Low
Construction Equipment
and Code
Updates
Strategy 4: Increase Building Energy Efficiency
Implement Energy
Municipal
E-1
Efficient Projects in
PW
Mid -Term
Medium
Medium
Municipal Facilities
Operations
Notes: BD = Building Division; CD = Community Development Department; CM = City Manager's Office; ENG = Engineering Department,- EV = electric vehicle; PV = Photovoltaic; PW = Public Works Department; SANDAG = San Diego Association of Governments Source: Ascent Environmental 2019.
City of Vista Annual Climate Action Plan Monitoring Report 2024 16 10/03/2024 D 1 Page 26 of 145
Executive Summary
Table 1 Measure Summary
Responsible Staff
Implementation Ease of
ure MeasTitle Category Department/ Implementation
Agency Timeframe Costs Implementation
9 Y
Strategy 5: Increase Renewable and Zero -Carbon Energy
E 2
Continue PV Installation at
Municipal
PW, ENG
Ongoing
Low
Low
Municipal Facilities
Operations
Financing
and
Join a Program to
Incentives;
E-3
Increase Grid -Supply
Partnerships;
CM
Long -Term
High
High
Renewable and Zero-
Education
Carbon Electricity
and
Outreach
Strategy 6: Reduce and Recycle Solid Waste
New
Reduce Solid Waste
Ordinances
W-1
Disposal and Increase
and Code
PW
Mid -Term
Medium
High
Recycling
Updates;
Partnerships
Strategy 7: Carbon Sequestration
Increase Tree Planting at
Municipal
C-1
Municipal Facilities and
Operations;
PW
Short -Term
Low
Medium
Public Rights -of -Way
Partnerships
New
Ordinances
Increase Tree Planting at
and Code
C 2
Updates;
CD; PW
Short -Term
Low
Medium
New Private Properties
Education
and
Outreach
Notes: BD = Building Division; CD = Community Development Department; CM = City Manager's Office; ENG = Engineering Department; EV = electric vehicle; PV = Photovoltaic; PW = Public Works Department; SANDAG = San Diego Association of Governments Source: Ascent Environmental 2019.
City of Vista Annual Climate Action Plan Monitoring Report 2024 17 10/03/2024 D 1 Page 27 of 145
Greenhouse Gas Inventory
The city has been working toward GHG emission reductions and to meet the targets set forth in our 2021 CAP Update. The GHG inventory that our 2021 Update has is a baseline 2012 GHG Inventory. The City acquires their GHG inventory through SANDAG's RECAP snapshots which are meant to be published every two years. The most recent, complete, inventory is from 2016 data (Figure 1), as the 2020 inventory (Figure 2) did not include on -road transportation. Based on figures 1 & 2, without sufficient on -road transportation data, which accounts for over half of GHG emissions, the 2020 inventory cannot be a reliable data source for progress tracking. SANDAG should be publishing a new GHG inventory for each city mid 2025 which will give each city a better idea on their progress toward reducing their GHG emissions.
Figure 1: Figure 2:
GHGINVENTORY*
'This GHG irmentory is based on 2016 data. I ?
537,000 MT CO,e
Total GHG emissions
estimated ror 2016
■ ON -ROAD TRANSPORTATION
0 ELECTRICITY
■ NATURAL GAS
■ SOLID WASTE
■ WATER
■ WASTEWATER
■ OFF -ROAD TRANSPORTATION
2020 GHG
Inventory*
`This GHG inventory is based on
best available data from 2020
for all listed secto rs and excludes MT CO2e
on -road transportation
150,OD0
QELECTRICITY
NATURALGAS
A SOLID WASTE
© WATER
WASTEWATER
A OFF -ROAD
TRANSPORTATION
ON -ROAD
TRANSPORTATION
Sourrx. PzMS, Call— SAN L,
135,000
1MD)o
76,000
M
JIB
26,000
17,000 4�, �
Q
- ■ "'.
NOT
AVA - E
Comparing the complete 2016 GHG Inventory against the 2012 baseline, the city did accomplish an 11 % reduction in emissions. With new technology, legislation, and the adoption and implementation of the 2021 CAP, the City anticipates more significant reductions than what was seen from 2012 to 2016.
City of Vista Annual Climate Action Plan Monitoring Report 2024 18 10/03/2024 D 1 Page 28 of 145
Progress Per Measure
The following section provides a brief update on each of the measures in the 2021 Climate Action Plan Update. Each table identifies the strategy, measure, goal for each measure, implementation category, primary department responsible, imp status, and the key actions taken per measure. The completion and progress for each of these measures is a quick snapshot at where the city is as of March 2024. The role of the Climate Action Plan Program Administrator was vacant for six months of 2023, so now that this role is filled and there is a dedicated staff member for implementing and managing the implementation of the CAP the city anticipates the progress on these goals to accelerate.
Strategy 1: Increase Use of Zero-Emission/Alternative Fuel Vehicles Measure T-1- Transition to a Clean and More Fuel -Efficient Municipal Vehicle Fleet Goal: Replace 47 vehicles to EV or PHEV by 2030
Category:
I Municipal Operations
Primary Department:
PW
Status:
In Progress, Awaiting Resources
Have currently replaced 6 vehicles, 4 of them in 2023
Key Actions Taken:
All vehicles on a 7-year replacement schedule aligned with annual budget Many EV providers have a waitlist, and there are not affordable options for cities to replace their mid -heavy-duty trucks currently on the market.
Strategy 1: Increase Use of Zero-Emission/Alternative Fuel Vehicles Measure T-2 - Increase Electric Vehicle Charging Stations at Public Facilities Goal: Install 20 Level 2 or better EV charging stations at city -owned facilities available for public use by 2030 Category:
I Municipal Operations
Primary Department:
I CD & PW
Status:
I In Progress, On Schedule
Currently being worked on as a CIP project and in design phase, which will install around 90 EV chargers across the city for public use at city owned facilities.
Key Actions Taken:
Preliminary design suggests city will surpass this goal Project should be complete by 2026
i i i
City of Vista Annual Climate Action Plan Monitoring Report 2024 19 10/03/2024 D 1 Page 29 of 145
Progress Per Measure
Strategy 1: Increase Use of Zero-Emission/Alternative Fuel Vehicles Measure T-3 - Require Electric Vehicle Charging Stations at New Multi -Family and Commercial Developments Goal: Install 188 new EV charging stations at new multi -family developments by 2030 Install 108 new EV charging station at new commercial developments by 2030 New Ordinances
I
Building Division & Community
7 Category:
and Code Updates
Primary Department:
Development Department
Status:
In Progress, More Data Needed
Working to establish a quantifiable list of how many EV charging stations have been installed in the past 3 years at new developments
Key Actions Taken:
State law requires 5% EV Charger Installed parking spaces for new multifamily developments and will increase to 10% for new multifamily developments in July 2024 and 5% for new commercial developments in July 2024
Strategy 2: Reduce Vehicle Miles Traveled
Measure T-4 - Participate in the San Diego Association of Government's iCommute Vanpool Program Goal: Maintain a minimum of 18 SANDAG vanpools annually that start or end in the city Partnerships; Education
Primary
Category:
& Outreach
Department:
City Manager & Community Development
Status:
In Progress, On Schedule
Continuously meeting with SANDAG to establish alternative commuting options for City employees
Key Actions
Taken:
Working on advertising SANDAG's Sustainable Transportation program to other businesses in Vista to create more education and participation in sustainable commuting by either carpooling, public transit, biking, or walking
City of Vista Annual Climate Action Plan Monitoring Report 2024 110 10/03/2024 D 1 Page 30 of 145
Progress Per Measure
Strategy 2: Reduce Vehicle Miles Traveled
Measure T-5 - Implement the City's Bicycle Master Plan
Goal: Install an additional 12 miles of two-way bicycle lanes (Class II or better) by 2023 Category:
I Planning
Primary Department:
Community Development & Engineering
Status:
In Progress, Awaiting Resources
Have been updating infrastructure through city with green bike lanes, additional bicycles lanes and updating bicycle ordinance to include a -bikes Key Actions Taken:
SANDAG working to complete Vista portion of the Inland Rail Trail to be completed by 2029
Awaiting funds to be able to re -do the Bicycle Master Plan (2015) O�O
Strategy 2: Reduce Vehicle Miles Traveled
Measure T-6 - Increase Density and Mixed -Use Development Goal: Complete the Vista Palomar and Vista Melrose 47 Projects Category:
I Planning
Primary Department:
City Manager & Community Development
Status:
In Progress, On Schedule
Vista Palomar Project is Pending Review and Vista Melrose is Approved Key Actions Taken:
Vista is currently going through a General Plan Update, where the focus is increasing mixed use and higher density along the main traffic corridors Multiple high -density projects in the city have been approved or on the road to approval ME
Strategy 3: Reduce Fossil Fuel Use
Measure T-7 - Require Electric -Powered or Alternative Fueled Construction Equipment Goal: Require that 30% of construction equipment in new development projects be electric -powered or alternatively fueled.
New Ordinances and
Building Department and Community
Category:
Code Updates
Primary Department:
Development
Status:
Not Started
This has not been initiated at the City yet, there has not been sufficient staff support to Key Actions Taken:
research, develop, and implement
City plans to initiate this policy late 2024
City of Vista Annual Climate Action Plan Monitoring Report 2024 111 10/03/2024 D 1 Page 31 of 145
Progress Per Measure
Strategy 4: Increase Building Efficiency
Measure E-1- Implement Energy Efficient Projects in Municipal Facilities Goal: Complete energy efficiency projects identified in the 2018 energy audit that will reduce municipal facility energy use by 1 million kWh by 2030
Category:
I Municipal Operations
Primary Department:
Public Works
Status
Completed, Ongoing
In 2020, completed a city-wide LED lighting upgrade in partnership with SANDAG, TRC, and the California Conservation Corp.
Key Actions Taken:
With every remodel or renovation to city facilities energy efficient practices are being worked into the design
I�
r
Strategy 5: Increase Renewable and Zero -Carbon Energy
Measure E-2 - Continue Photovoltaic Installation at Municipal Facilities Goal: Install 400 kW new behind -the -meter PV at city facilities by 2030 Category:
I Municipal Operations
Primary Department: I Public Works & Engineering
Status:
In Progress, On Schedule
PV installation at our Public Works admin building completed in 2022 Key Actions Taken:
Current projects in the works to add solar carports to the Civic Center Parking Lot and Fire Station 3 to be completed by 2027
These projects will exceed the kW behind the meter amounts for this goal City of Vista Annual Climate Action Plan Monitoring Report 2024 112 10/03/2024 D 1 Page 32 of 145
Progress Per Measure
Strategy 5: Increase Renewable and Zero -Carbon Energy
Measure E-3 - Join a Program to Increase Grid -Supply Renewable and Zero -Carbon Electricity Goal: Achieve 90% renewable or zero -carbon electricity by 2030 Financing and Incentives; Partnerships;
Primary
Category:
Education and Outreach
Department:
City Manager
Status:
Complete, Ongoing
In 2022 City Council entered a Joint Powers Agreement with the Clean Energy Alliance, a Community Choice Aggregator
Key
In Nov. 2023 the city council selected a 50% renewable and 75% carbon free option as the default Actions
selection for Vista residents and businesses and 100% renewable energy for all city facilities and Taken
municipal operations
City encouraging businesses and residents to opt up to 100% renewable energy, and CEA states that the 50% renewable to grow to 100% renewable energy by 2023.
OL jp--
CLEAN ENERGYALLIANCE
Strategy 6: Reduce and Recycle Solid Waste
Measure W-1- Reduce Solid Waste Disposal and Increase Recycling Goal: Achieve 85% waste diversion citywide by 2030
New Ordinances and Code Updates;
Category:
Partnerships
Primary Department:
Public Works
Status:
In Progress, More Data Needed
Organics recycling mandated by SB 1383 starting in 2022, has helped increase waste diversion from the landfill
Key
Actions
Vista's partnership with our waste hauler, EDCO, helps with communication to our residents and Taken:
businesses about organics recycling and how to recycle right Working to compile cities current disposal rate
City of Vista Annual Climate Action Plan Monitoring Report 2024 113 10/03/2024 D 1 Page 33 of 145
Progress Per Measure
Strategy 7: Carbon Sequestration
Measure C-1- Increase Tree Planting at Municipal Facilities and Public Rights -of -Way Goal: Plant an average of 100 trees annually through 2030 (1,300 trees by 2030) Category:
I Municipal Operations; Partnerships
Primary Department:
I Public Works
Status:
In Progress, On Schedule
From 2020-2023 city received several grants which resulted in planting around 875 trees at municipal facilities and public right of way
Key Actions Taken:
City received another grant to plant an additional 175 trees in the public right of way with irrigation to be completed by 2026
With every new project and renovation, the city looks at incorporating trees to the landscape design
r
Strategy 7: Carbon Sequestration
Measure C-2 - Increase Tree Planting at New Private Properties Goal: Plant an Everage of 500 new trees annually at new developments through 2030 (5,500 net new trees by 2030) New Ordinances and Code
I
Primary
Category:
Updates; Education and Outreach
Department:
Community Development &Public Works
Status:
In Progress, More Data Needed
City's landscaping manual was updated in 2022 and requires 1 tree per every 4-6 parking spots depending on the development type
Key Actions Taken:
City Council requests all developers of new projects to add as many trees as possible to the project during the landscape design
City of Vista Annual Climate Action Plan Monitoring Report 2024 114 10/03/2024 D 1 Page 34 of 145
Equity &Jobs
While the City of Vista is fortunate to not have too large of a disadvantaged population currently, there is a continuous focus on our communities of concern. These communities are those that face larger economic, health and environmental burdens than others within our city.
The majority of grants that the City applies for are targeted to disadvantaged and environmental justice communities. Through these grants the Vista was able to fund the upcoming tree planting project along North Santa Fe Avenue that will benefit communities who struggle the most with urban canopy. During all public meetings there are opportunities for members of any community to participate and the most recent general plan meetings were also held by district to promote inclusion.
Vista's CAP does not call for creating green jobs, however it is an effort the city fully supports.
Creating jobs that provide a benefit to the environment or conserve natural resources not only helps the beautification of the city but also boost the local green economy. In 2022, the City of Vista created the Climate Action Plan Program Administrator role at the city and created two positions for the Community Improvement Team, which exemplifies the support of high paying green jobs. In addition, with all the implementation efforts laid out within the CAP, the City partners, contracts, and utilizes several businesses that provide green services like sustainable transportation planning, solar panel and EV charging installation, and clean energy procurement.
Lastly, the City of Vista has recently become a partner with the San Diego Regional Green Business Network which is a free consultation program that all Vista businesses can take advantage of to become a Certified Green Business with the State. This program will help all Vista businesses, regardless of size or revenues, to conserve energy, reduce waste, and implement more sustainable practices.
City of Vista Annual Climate Action Plan Monitoring Report 2024 115 10/03/2024 D 1 Page 35 of 145
Energy
In August of 2022, the City of Vista and Clean Energy Alliance (CEA), a Community Choice Aggregator, signed a joint powers agreement, allowing Vista to be apart of their clean energy program effective April of 2024. In November of 2023, the City Council agreed to have the default power supply for residents & businesses be a 50% renewable with a 75% carbon free energy choice.
Council also voted to have all city facilities and operations have the default of 100% renewable energy. Currently, the city has been organizing outreach opportunities and engagement events with our residents and businesses to encourage them to "opt up" to 100% renewable energy if that is a feasible financial option for them.
Joining the CEA assists the city with their energy efficiency goals because they offer programs to help homeowners and renters be more energy efficient. The City shares information to the public via social media on tips and tricks to save energy and water in partnership with other organizations as well. Though the city does not control water delivery to their residents and business, handled by a separate entity Vista Irrigation District, the city does encourage water conservation through our stormwater division. With that said the City has been installing smart controller irrigation systems to our parks and medians which monitor when it rains and will postpone watering until several days after a rain event.
Another large task the city is taking on related to energy is transitioning the municipal fleet to electric vehicles and encouraging the transition to electric vehicles to our residents/visitors by adding the necessary infrastructure. While there are some roadblocks with transitioning the larger or midsize vehicles in our fleet due to availability and affordability of technology, the obstacle the city has faced with the light duty vehicles is not having the charging infrastructure in place. To combat this the city has engaged in a citywide capital improvement project which will add around 90 EV chargers across the city. These chargers will be installed at city owned properties and be fully accessible to the public. Having a citywide EV charging infrastructure will provide residents reassurance that they will have a place to charge their vehicle while out enjoying the many amenities the city has to offer and encourage those who do not own an EV to consider transitioning to one.
City of Vista Annual Climate Action Plan Monitoring Report 2024 116 10/03/2024 D 1 Page 36 of 145
Transportation & Land Use
In 2024, the City began working with SANDAG's Sustainable Transportation division to start establishing sustainable commuter benefits for its employees. There were previous efforts, however they struggled with the impact of the COVID pandemic. Working with SANDAG has resulted in conducting a citywide survey for employees to identify how they currently commute to and from work. The data from this survey is now being used to create educational tools and build programs for city employees to encourage the use of more sustainable modes of transportation besides single occupancy vehicles. Once Vista has an established program, the City will advertise the program to the businesses of Vista and encourage other employers to create sustainable commuting programs for their employees. With this, the City of Vista is on track to establish more sustainable modes of transportation for both our employees, businesses, and residents.
Another way the City is aiming to reduce vehicle miles traveled on our roadways by our residents and businesses is implementing more mixed use and high density within our highly trafficked areas. The City is currently going through the process of updating their general plan for 2050, and the primary focus of this update is adding higher density mixed use areas along the main traffic corridors to reduce Vehicle Miles Traveled (VMT) for the growing population as more housing is developed. With all new developments, affordable housing or commercial, there are considerations for how people will be traveling around, in, and out of the city with an emphasis on access to public transportation.
City of Vista Annual Climate Action Plan Monitoring Report 2024 117 10/03/2024 D 1 Page 37 of 145
Transportation & Land Use
The City of Vista is actively working on updating biking infrastructure and policy around the city as called out in the Bicycle Master Plan. These efforts can be seen in new green bike lanes, adding separated bicycle lanes, and updating the City's bicycle ordinance. The city has also been working toward the program recommendations called out in the Bicycle Master Plan and will be partnering with SANDAG and the San Diego County Bicycle Coalition to have bicycling safety courses offered to the public for free in 2024. Paired with these bicycling safety courses will also be an a -bike rebate program for residents to help promote cycling as a transportation option in the City.
In addition to biking infrastructure and policy, the City is seeking to fund several Complete Streets projects through Active Transportation Program Grants and state earmarks. Currently, the City is nearing completion on the Townsite Complete Streets projects which was developed to encourage increase use of active modes of transportation such as biking and walking. The project should be completed in summer 2024 and transformed approximately 1.2 miles of Townsite Drive by constructing sidewalks, updating ADA ramps, constructing four roundabouts, curb extensions high visibility crosswalks and sharrows.
. a11
Vista has also been installing roundabouts in its higher traffic areas to calm traffic and increase walkability of the city. The City has adopted a traffic calming program as a way to address speed in residential areas which allows residents to request traffic calming measures to be implemented in their neighborhoods. These measures can be anything from additional striping or signage to installation of speed humps in the neighborhood.
City of Vista Annual Climate Action Plan Monitoring Report 2024 118 10/03/2024 D 1 Page 38 of 145
Zero Waste
The City works closely with our waste hauler, EDCO, to work with and educate our businesses and residents on waste diversion, organics recycling, and waste reduction methods.
The City of Vista is also a member of the Regional Solid Waste Association (RSWA) and works with the Solana Center which has been helping monitor the city's progress on SB1383 which has the requirement to divert 75% of the city's organic waste from the landfill, to be recycled/composted or if edible, recovered for redistribution to those in need.
In addition to diverting organic waste and recovering edible food to meet the city's waste diversion goals, in 2021 the City Council approved an ordinance which bans food service providers (restaurants, cafes, food trucks, etc.) from providing their customers prepared food in polystyrene, or Styrofoam, containers. The City has been spreading awareness to their food service providers on the polystyrene ban as well as the states single use food ware accessories and condiments reduction (AB 1276) through email, mailers, newsletters, and in person visits.
Trees
The City of Vista is on the path to reach their goal tree canopy coverage target and planting goals as outlined in the 2021 CAP Update. In the past three years the city has planted nearly 1,000 trees and has projects and programs in the works that promise to continue to increase planting. In addition, the City's landscaping manual for new developments was updated and it now requires one tree to be planted for every four to six parking spots depending on the development type. One of the upcoming projects that is fully funded by grant funds is tree planting with irrigation along the North Santa Fe corridor which runs through one of Vista's disadvantaged communities.
Starting in 2024, the City of Vista will begin a pilot program for a Residential Free Tree Giveaway, where residents will be able received a free tree by delivery or pick up or be reimbursed for purchasing a tree at a Vista nursery. The City is also looking to apply for grants that will help them fund and develop an urban forestry plan.
It
City of Vista Annual Climate Action Plan Monitoring Report 2024 119 10/03/2024 D 1 Page 39 of 145
A- 0
CJ
The ReCAP Snapshot is prepared for the City as a part of the SANDAG Regional Climate Action Planning Framework (ReCAP) to support, but not replace, cities' monitoring greenhouse gas (GHG) emissions and/or climate action plan (CAP) implementation over time. Climate planning activities vary by jurisdiction and are dependent on a variety of factors, such as funding and staff capacity. As the first edition of Snapshots (November 2019), this document will set a baseline for monitoring trends into the future. More information, including a FAQ document and Methods and Data Sources Summary, is available at www.sandag.org/climate .
RECENT ACCOMPLISHMENTS
0 Hosted a successful CAP Update community outreach program (6 meetings, private and public interest groups, website, surveys, photo history).
Received the 2019 Association of Environmental Professionals (AEP) Outstanding Public Involvement Award for CAP community engagement.
Updated the Energy Roadmap which will supplement the City's CAP.
Initiating process to evaluate Community Choice Energy (CCE) within the City.
Received funding to plant 550 new trees citywide.
GHG INVENTORY*
*This GHG inventory is based on 2016 data.
5373000 MTCO2e
Total GHG emissions
estimated for 2016
■ ON -ROAD TRANSPORTATION
■ ELECTRICITY
■ NATURAL GAS
■ SOLID WASTE
■ WATER
■ WASTEWATER
■ OFF -ROAD TRANSPORTATION
10/03/2024
100s093
population in 2016
19 square miles
30s681
occupied housing
units in 2016*
Current CAP progress:
Adopted 2012
Subregion:
North County Inland
* Opup
�hr�0,�e1 45nclude
grouarters.
These select activity data represent best available data* for common GHG reduction activities included in local CAPs across the SANDAG region and may not align precisely to GHG reduction measures and/or the metrics identified within a jurisdiction's CAP. Community -wide activities occur within a jurisdiction's boundaries; municipal activities occur at City -owned facilities. For more information on data sources, the Methods and Data Sources Summary is available at www.sandag.org/climate .
TRANSPORTATION
COMMUNITY -WIDE (DATA YEAR: 2016-2018)
20 public electric
vehicle chargers
6,277
clean vehicles registered
(9% total registered vehicles)
�, 32 total miles of bike lanes
12,229 passengers on
and off transit per weekday
4 local businesses
participating in SANDAG
iCommute program events
MUNICIPAL (DATA YEAR:2018)
2 electric vehicle chargers
4 clean vehicles in fleet
WATER + WASTEWATER
ENERGY EFFICIENCY
COMMUNITY -WIDE (DATA YEAR: 2016-2017)
471,543 MWh
00000472
of electricity consumed
0P150H
14.7 million therms
of natural gas consumed
9,007 MWh
electricity saved through
OSDG&E
programs
MUNICIPAL (DATA YEAR:2018)
5,605 MWh
of electricity consumed
44,055 therms
of natural gas consumed
_
1 energy efficiency project
installed, which resulted in
4 first -year reductions of:
19,244 kWh
RENEWABLE ENERGY
COMMUNITY -WIDE (DATA YEAR:2016) COMMUNITY -WIDE (DATA YEAR:2016-2018) 108 gallons 43% renewables in
water used/person/day =' grid electricity supply
61 gallons wastewater �� 35 MW PV online
produced/person/day
MUNICIPAL (DATA YEAR:2018)
SOLID WASTE
COMMUNITY -WIDE (DATA YEAR:2016)
5.4 Ibs waste disposed
in landfill/person/day
58/ waste diverted
SANDAG
47 kW total PV capacity
CARBON SEQUESTRATION
MUNICIPAL (DATA YEAR:2018)
04 50 trees planted annually
CREPIG
City of 491PI/M41D Snapshot - November 2019 Erbhltion * Snapshot activitR8gEYr4JhE)JeaJ4E)6 through 2018, depending on the most recently available year for each activity. Activity data represents a single year.
Re
CAP
SANDAG
Image 1: Total Freeway Vehicle Miles Traveled in
San Diego Region (2019, 2020, 2021)
The ReCAP Snapshot is prepared for the City as
1.4 a part of the SANDAG Regional Climate Action
1.2 +2019
Planning Framework (ReCAP) to support, but
10 +2020
not replace, cities' monitoring of greenhouse gas
Ln
iv y2021
(GHG) emissions and/or climate action plan (CAP)
0.8 implementation over time. The 2020 Snapshots are
�
0 0.6 i
unique as the Covid-19 pandemic had impacts on
m 0.4
Region wide peak
our day-to-day activities in 2020. More information,
period highway
includinga FAQ document is available at
0.2 travel was down
-16.7% in 2020
FAQ (sandag.org).
- from 2019
1 2 3 4 5 6 7 8 9 10 11 12
Month
2020 GHG
Source: PeMS, Caltrans. SANDAG 2020 State of the Commute Report Inventory*
*This GHG inventory is based on
VISTA
best available data from 2020
QUICK
for all listed sectors and excludes MT CO2e
on -road transportation
150,000
102,928
© ELECTRICITY 135,000
population in 2020
A NATURAL GAS
19 square miles
100,000
III SOLID WASTE
31 537
76,000
® WATER
occupied housing
�,
units in 2020
WASTEWATER 50,000
s Current CAP progress:
Updated 2021
O
OFF -ROAD
TRANSPORTATION
26,000
® Subregion:
17,000L_,�.o
000
ON -ROAD
NOT North County Inland
■AVAILABLE
TRANSPORTATION 0
Image 2
The 2020 GHG emissions inventory was prepared using the best available data for each emissions category and does not include on -road transportation. The activity data for electricity, natural gas, solid waste, and water sectors are based on tracked and observed usage for the year and therefore, correctly reflect the impacts of Covid-19. However, for on -road transportation, the vehicle miles traveled (VMT) data are estimates from the SANDAL activity based model (ABM). The most recent SANDAG activity based model, ABM2+, was last calibrated with observed data from 2016 and forecasts 2020 VMT. While transportation historically accounts for the largest share of GHG emissions in an inventory, the forecasted VMT does not take into account the impacts of the Covid-19 pandemic and cannot be updated to provide 2020 VMT data for each jurisdiction. Caltrans PeMS data provides observed regional VMT on freeways for 2020. Image 1 compares the observed VMT on freeways in the San Diego region for the years 2019, 2020 and 2021. The observed data is only available for freeway and it cannot be scaled down to individual jurisdictions which have different configuration of roads. While other sources of data and anecdotal experience show lower VMT in 2020, there is no data for how each jurisdiction's VMT changed during 2020. The Caltrans PeMS data set shows similar travel trends in 2021 as in 2019 which suggests that lower VMT in 2020 is likely due to the impacts of the Covid-19 pandemic and may not sustain long term.
GHG emissions inventories are one tool to support, but not replace, monitoring of CAP implementation at the local level. Together, a GHG emis,,Sj lbT/y6 f4nd activity data reflect CAP implemen,61n progress. Page 42 Of 145
These select activity data represent data for the year 2020 for common GHG reduction activities included in local CAPS across the SANDAG region and may not align precisely with GHG reduction measures and/ or metrics identified within a jurisdiction's CAP. Community -wide activities occur within a jurisdiction's boundaries; municipal activities occur at City -owned facilities. For more information on data sources, the Methods and Data Sources Summary is available at sandag.org/climate.
Transportation
Energy Use
COMMUNITY -WIDE
COMMUNITY -WIDE
23 public electric
00000a" 417,544 MWh of electricity
lip
vehicle chargers
8+0�00,V consumed
11,673 alternative fuel
14 million therms
vehicles (12% of total
registered vehicles)
of natural gas consumed
1,064 zero emission
vehicles
Renewable Energy
(1% of total registered vehicles)
Ap
34 total miles of bicycle
COMMUNITY -WIDE
lanes
31% renewables in SDG&E
--Fi
10,166 passengers on and
11ftoft electricity supply
NQ�
off transit per weekday
RQ
I 52 MW PV Capacity
'
2 local businesses
MUNICIPAL
participating in SANDAG
47 kW PV Capacity
iCommute program events
MUNICIPAL
Solid Waste
4 electric vehicle chargers*
COMMUNITY -WIDE
4 clean vehicles in fleet
11 5.4 Ibs waste disposed
in landfill/person/day
Water +
Wastewater
58% waste diverted
COMMUNITY -WIDE
*EV chargers include both municipal fleet and
109 gallons
publicly available chargers.
of water used/person/day
64.5 gallons of wastewater
produced/person/day
SANDAG
[EPIC
City of Vista 1 2020 ReCAP Snapshot - April 2023
10/03/2024 D 1
Frazee Rd
2m
0 ti
00 a�
Gio
via
Olive Dr O."40
a
a'
Legend:
c
a
N
Q
Z
0 0
J
r
W
w
cx
w
7 w
to
Note' pv
Lake Blvd
N
a
v
0 Oceanside
OLIVE
V
DR HACIE
MELROSE WY
CV
CITY OF VISTA
Bike Lane
Bike Route
� Multi -Use Path
■ ■ ■ mom Proposed Multi -Use Path
TAYLF,
OR
ARCADIA AV
W LOS
"1NGELES\_
. TOWNSZ���
QWALE TERRACE -DR
•• I I�
R HEATHER DR V f \
J���Pps ��Q STq DR
LYP
TUsq� JZ
E TAYLOR ST
r
1A,.. DO DE
jOMA DR
'w4EIBOBIEWD
Z
Z.
9L
Q
N
z 'Q
UN, i
w���� /
JP� �
`CRESS •
VIEW W9
MPR'vISTAPDR
0?-
FARADq
P� S1
-,.--- - - - - -- -�
cEN-�EFt DR
QP
j'alotY►ar A�rP
octgd
a
v
MONTE \ZSiA DR
44 Al,
,p
DR
San �► ac co' g1v d
O`
T
�v
e
7�
W San Marcos $w d
asc
�10)
Z
Note:
Green bike lane paint
applied at intersections
only.
,6
Ce
via
Oceanside
NORTH AV
:OLIVE AV,
ov,
Olive Dr
a
v
o
=.1
w
L
w
�
z
...
O
9)
r_
3 C
a
sW VISTA WY = $ ---
NP�I=�R HACIENDA DR
6 W LOS
"�NGELES°� O�
POWNSZ0E
1:.
�p
JP�
`CRESS
VIEW' z
VALE TERRACE DR
HEATHER DR
JZ��PO
A�(P
EUCALYPTS
q�
O� �rA•FFgV
�v
Lti
MARVISTA DR
LQke 81w 9DR.
c,.
4OPINE HILLS OR
Gary' � 0-,,OAKR�.
IISHADOWRIDGE DR
oNGHORN DR
CITY OF VISTA
Le end
Next Phase Green Bike Lanes "ian"tAirPwtRd
Already Implemented Green Bike Lanes
O
U
W
4 v
MONTE �ZSw DR
11 �
I
ER DRi s
QP� GENE c
FARADq
Py ST
7 �
ortgd
j'alomar A�rP
der°se
Or
W San Marcos $w d
asohi 1
Transportation
INLAND RAIL TRAIL -
SAN MARCOS TO VISTA
FACT SHEET
SANDAG
GO by BIKE Program
Scan the QR code to visit
the project vvebpage for the
Inland Rail Trail
401 B Street, Suite 800
San Diego, CA 92101
(619) 699-1900
Fax (619) 699 1905
SAN DAG.org
OSANDAGregion
© SANDAG
OSANDAGregion
SANDAGregion
jn SANDAG
The Project
The Inland Rail Trail is a proposed 21-mile
Class I bikeway that will run through the
cities of Escondido, San Marcos, Vista,
and Oceanside, as well as a portion of
the unincorporated County of San Diego.
A Class I bikeway is a multi -use path
that is physically separate from motor
vehicle traff c. The easternmost section
of the Inland Rail Trail was completed
in 2009 by the cities of Escondido and
San Marcos and extends seven miles
between the Escondido Transit Center
and the intersection of West Mission
Road and North Pacif c Street in the City
of San Marcos.
The San Marcos to Vista segment of
the Inland Rail Trail will be a seven -mile
Class I bikeway. The project begins at
the intersection of West Mission Road
and North Pacif c Street in San Marcos,
and ends at the intersection of North
Melrose Drive and West Bobier Drive in
Oceanside. When completed, the path
will provide access to fve SPRINTER
stations. The project is generally located
in the North County Transit District
(NCTD) right-of-way.
NORTH MELROSE
19141wlol-)ill
The westernmost portion of the Inland
Rail Trail, which will extend the bikeway
seven more miles from the intersection
of North Melrose Drive and West Bobier
Drive to Wisconsin Avenue in the City of
Oceanside, will be part of a future project.
Project Features
The San Marcos to Vista segment of the
Inland Rail Trail will generally consist of
an eight to ten -foot -wide trail with a two -
foot -wide unpaved shoulder on each for
a total width of 12 to 14 feet. Additional
project features include:
Fencing on both sides of the bikeway
(where necessary)
Landscaping
Lighting
Retaining walls in areas with steep slopes
SPRINTER connections and rest stops
Drainage improvements
A bridge over Buena Creek
Minor intersection crossing
improvements
(Continued on reverse)
4JL—
DRIVE
CENTER DRIVE
1M/AR VISTA DRIVE
COUNTY OF
SAN DIEGO
\ NCHER DRIVE CARLSBAD PACIFICOCEAN © VISTA PACIFIC STREET Legend: s
Phase l: Completed -Opened to the public in February 2017 (1 mile) 5 Phase 2: Completed -Opened to the public in January 2021(3 miles) Phase 3: In Final Design -Construction anticipated to begin in 2023 (l mile) SAN MARCOS Phase 4: In Final Design- Construction anticipated to begin in 2026(2miles) O SPRINTERstation ESCONDI
O Previously Completed Segment
O Future Segment
N
10/03/2024 D1 Page 46 of 145
SANDAL
Op E CON i0
0 o
sBapoA0.ik91ppg
NORTH COUNTY
TRANSIT DISTRICT _
The Need
The Inland Rail Trail is considered a
priority project by SANDAG and is
an important part of the San Diego
Regional Bike Plan Early Action Program
(EAP). The completion of this trail and
other bikeways will help create a more
comfortable, convenient, and connected
regional bike network.
The EAP is an initiative that was
approved by the SANDAG Board of
Directors in 2013 to build a regional
network of high -quality bikeways
and complete streets that reimagine
how we use space on our roadways.
Together, these projects aim to make
it easier, safer, and more practical for
people of all ages and abilities to use
active transportation, including biking,
walking, skating, scooting, and using a
wheelchair.
Planning for a more bike -friendly region
helps address complex and interrelated
issues, including traff c congestion, air
pollution, climate change, public health,
and livability. By creating a robust
regional bike network by 2050, the plan
can make a difference in these areas of
concern, thereby improving existing and
future quality of life in the San Diego
region.
Project Status -
San Marcos to Vista Segment
Phase 1: Construction of the one -mile
segment that extends between North
Pacif c Street and Cherimoya Drive in the
City of San Marcos began in 2015 and was
completed and opened to the public in
February2017.
Phase 2: This phase was divided into
south and north segments, which were
completed and opened to the public in
January 2021.
- Construction of the south segment that
extends 2.5 miles between Cherimoya
Drive and Mar Vista Drive through
unincorporated San Diego County and
the City of Vista began in late 2016.
- Construction of the north segment that
extends a half -mile between North Drive
in the City of Vista and North Melrose
Drive in the City of Oceanside began in
late 2017.
Phase 3: Construction of the one -mile
segment that will extend between Mar
Vista Drive and Civic Center Drive in the
City of Vista is expected to begin in 2023
and open to the public in 2024.
Phase 4: Construction of the remaining
two miles that will extend between Civic
Center Drive and North Drive in the City
of Vista is expected to begin in 2026 and
open to the public in 2029.
Project Costs -
San Marcos to Vista Segment
The current budget for the project is $37.1
million, which is funded by a variety of
sources, including the regional TransNet
half -cent sales tax administered by
SANDAG.
For More Information
Visit KeepSanDiegoMoving.com/
InlandRailTrail or contact the SANDAG
GO by BIKE Team via email at
GObyBIKE&sandag.org or
by phone at our toll -free construction
hotline: (833) 899-BIKE (2453).
10/03/2024
Brought to you by the SANDAG TransNet Program May2022
D 1 Page 47 of 145 6747
TRC
Results you can rely on
Prepared by
Stephen Brett Reno
Lake Casco, PE
TRC Energy Services
9685 Research Drive
Irvine, CA 92618
City of Vista
200 Civic Center Dr.,Vista, CA 92084
Comprehensive Energy Audit Report
April 17, 2018
i
10/03/2024
D1
Energy Audit Report I City of Vista Government Facilities Q%SANIMG Table of Contents
1. Purpose of the Audit..............................................................................................................................2
2. Facility Description.................................................................................................................................3
3. Energy Savings and Cost Summary......................................................................................................4
3.1 Mechanical Systems............................................................................................................................6
3.2 Lighting Systems................................................................................................................................. 8 3.3 Controls Systems..............................................................................................................................10
3.4 Lighting Energy Efficiency Measures (EEM).....................................................................................11 EEM 1 — Replace and retrofit exterior fixtures with new LED fixtures and retrofit kits..............11 EEM 2 — Replace and retrofit interior fluorescent troffers with new LED fixtures and LED retrofitkits.......................................................................................................................................... 12 EEM 3 — Replace and retrofit recessed can CFLs with recessed can LED retrofit kits..............13 EEM 4 — Upgrade fluorescent MR16 lamps to LED MR16 lamps .................................................. 14 EEM 5 — Upgrade non-incentivized miscellaneous lighting to LED.............................................15 EEM 6 — Implement Advanced Lighting Controls...........................................................................16
3.5 Mechanical Energy Efficiency Measures (EEM)...............................................................................18 EEM 7 — Install variable frequency drives on Wave Water Park pool pumps..............................18 EEM8 — Optimal Start/Stop..............................................................................................................19 EEM 9 — Implement Occupancy -Based Zone Setback Controls ................................................... 20 Attachments................................................................................................................................................21 TRC Energy Services
10/03/2024
1 D1
April 17, 2018
Energy Audit Report I City of Vista Government Facilities DA
1. Purpose of the Audit
TRC Energy Services has completed a HVAC and Lighting audits various government facilities for the City of Vista and identified energy efficiency opportunities that have the potential to reduce total costs by $112,172 annually while also improving building comfort and safety, and reducing maintenance costs. This report details the audits for the City of Vista's Civic Center, Public Works Department, and Wave Water Park.
The City may be able to implement some of the recommended measures without detailed engineering.
Other measures will require more detailed engineering analysis of feasibility and constructability. This study does not include specific design instructions and is not intended as a design document. Projects have not been developed to design level. The design professional or other persons following the recommendations shall accept responsibility and liability for the results.
As technical consultants TRC Energy Services remains product and vendor neutral. The products presented in this report represent examples of the possible products that could be used for the project. The products were chosen based on their technological feasibility, efficiency and impact on the project economics. The analysis herein is based on the performance and pricing of these particular products. It should be noted that if the City would like to move forward with products other than those shown in this report, the analysis would need to be revised based on updated product performance and costs.
Acknowledgments
Special thanks to Keith Gardner and Mickey Romero of the City of Vista, Anna Lowe of the San Diego Association of Governments (SANDAG), as well as Adrian Salas and Chris Nanson of San Diego Gas & Electric (SDGE) for all their help and cooperation throughout the audit and reporting process.
TRC Energy Services 2 April 17, 2018
10/03/2024 D 1 Page 50 of 145
Energy Audit Report I City of Vista Government Facilities �SANDAG
2. Facility Description
The scope of this audit report covers (3) sites — The Vista Civic Center, Public Works facility, and Wave Water Park.
Site
Civic Center
..Number __JMMLnual
200 Civic Center Dr, Vista 92084 6542325866
kWh
1,335,989
Public Works
1165 E Taylor St, Vista 92084 9921051273
173,776
Wave Water Park
101 Wave Dr, Vista 92084 7606487402
586,284
Civic Center
The Vista Civic Center property contains parking, a garden, and a 100,000 sqft building constructed in 2010. The building houses a number of offices for public servants, numerous conference rooms, and a community room attached with kitchens and an event area. City council meets in the Center's council chambers twice a month. The Civic Center is occupied from 6am to 6pm Monday through Friday.
The property, split into two buildings varying from one to three floors, is heated and cooled by (6) AC units that operate from 4am to 5pm. The interior of the building is lit primarily by fluorescent T8 troffers and compact fluorescent can fixtures. The building's exterior walkways are illuminated by compact fluorescent can fixtures and bollards.
Public Works Facility
The Public Works facility serves the nearby community with services such as street repair, graffiti cleanup, and sewer system management. Its property is made up of several buildings covering a total of 14,000 sqft that house staff offices, shop areas, a fuel station and fleet parking. The facility is typically occupied 40 to 50 hours per week, Monday through Friday with most staff gone by 4pm. Fridays experience reduced occupancy as an alternative work schedule has staff gone every Friday, but staying later Monday through Thursday.
The facilities buildings are of industrial -style single -floor design, with metal exterior walls and roofs.
Heating and cooling for the facility is provided by a mix of gas and DX packaged units. The interior of the facility is illuminated by a mix of fluorescent T8 and T12 fixtures. The exterior is lit by several different wattages of HPS wall packs and pole top mounted fixtures. Additional electrical loads include personal computers and shop equipment.
Civic Center
Public Works
TRC Energy Services 3 April 17, 2018
10/03/2024 D 1 Page 51 of 145
Energy Audit Report I City of Vista Government Facilities �SANDAG
Wave Water Park
The Wave Water Park contains a large water slide, lazy river, competition pool, a playground for small children, and a concession area which sells food and swimming equipment. The park's slide and lazy river are open for five months a year during the summer, from 6am to 8pm. The competition pool remains available year-round for local practice sessions and competitions, 6am-10pm for five months during the summer, and 5am-8am/12pm-10pm during the winter.
A small heat pump conditions the park's front office, while small split units cool the snack bar. The majority of the interior of the facility is illuminated by fluorescent T8 fixtures, but T12s remain in the snack bar, front office and patio covers. Many types of HID flood lighting illuminate the parks' exterior areas. The park's pools are filtered by (6) pool pumps which cycle water at a constant speed.
Wave Water Park
3. Energy Savings and Cost Summary
Based on the site audits, TRC identified various energy efficiency measures. We sub -divided the measures into four categories:
1. Interior Lighting
All measures involving the illumination of building interiors.
2. Exterior Lighting
All measures involving the illumination of building exteriors, walkways, and parking lots.
3. Advanced Lighting Controls
All measures relating to advanced control systems at the Civic Center, including occupancy sensors, daylighting sensors, and HVAC system optimization.
4. Pool Pump VFDs
Relating to the installation of pool pump VFDs at Wave Water Park, along with associated control systems.
TRC Energy Services
10/03/2024
4 D1
April 17, 2018
Energy Audit Report I City of Vista Government Facilities �SANDAG
TRC did not consider onsite generation technologies such as renewable energy as a part of this study.
Also, the audited sites are not enrolled in any SDGE demand generation (DG), demand response (DR), or permanent load shifting (PLS) programs. The Vista Civic Center manages its own demand response system without assistance from SDGE in order to avoid peak demand charges.
While HVAC systems were audited, their associated energy saving measures will be evaluated at a later phase.
Table 3.1 below lists all the measures identified with project implementation economics. The tables estimated the annual utility savings based on a blended utility rate. Please find additional details on each measure in the Energy Efficiency Measure Description section below. *Linear surface mounted fixtures, MR16 fixtures, and exterior fixtures are currently assumed to not qualify for SDGE midstream incentives.
Solution
Code
"B.-ildin
tCLty
-]I
21 Electricity
Savings
7,725
Electric
.-
1.89 L Savings
7,725
Electric
Deman
1.89 Ann.algC,:
Savin
$1,093.57
Potential
Incentive
$0.00
Project
Implementation
cost
$9,993.53
Net
Implementation
cost
$9,993.53
Net Simple]
Payback
Period
9.1 Public Works
EEM-1:
Water Park
63 47,983
15.26 60,934
14.86 $6,648.00
$0.00
$38,977.30
$38,977.30
5.9 Exterior LED
Civic Center
8 919
0.23 919
0.23 $155.73
$0.00
$2,353.92
$2,353.92
15.1 EEM-2: LED
Public Works
145
19,263
7.87 19,263
7.87 $4,334.18
$3,625.00
$44,467.70
$40,842.70
9.4 Troffers
Civic Center
849
100,988
34.94 100,988
34.94 $19,590.39
$21,225.00
$210,977.25
$189,752.25
9.7 EEM-3:LED
Water Park
20 708
0.22 433
0.16 $150.91
$140.00
$2,700.96
$2,560.96
17.0 CANS
Civic Center
618
55,367
18.15 55,367
18.15 $9,228.32
$4,165.00
$60,901.94
$56,736.94
6.1 EEM-4: LED
Civic Center
48 4,941
1.73 4,941
1.73 $810.13
$0.00
$2,468.22
$2,468.22
3.0 MR16s
Public Works
88 5,538
2.03 5,538
2.03 $1,397.88
$0.00
$25,323.98
$25,323.98
18.1 EEM-5: No
Water Park
105
56,533
19.16 77,280
18.96 $9,243.29
$0.00
$42,928.42
$42,928.42
4.6 Incentive
Civic Center
374
42,329
14.02 42,329
14.02 $7,266.51
$0.00
$54,490.75
$54,490.75
7.5 EEM-6:
Advanced
Civic Center
793
45,854
11.36 45,854
11.36 $7,204.97
$1,375.61
$107,143.23
$105,767.62
14.7 Lighting
Controls
EEM 7: Non-
Water Park
N/A
118,847
6.96 118,847
6.96 $33,396.01
10,551.76
72,576.96
62,025.20
1.9 HVAC VFD
EEM 8:
Optimal
Civic Center
N/A
3,620
1.42 3,620
1.42 $796.38
$289.59
$4,700.63
$4,411.03
5.5 Start/Stop
EEM 9: Occ-
Based Zone
Civic Center
N/A
49,344
24.63 49,344
24.63 $10,855.60
$3,947.49
$9,758.26
$5,810.76
0.5 Setback
TOTAL
3,132
559,959
159.87
593,382
159.21
$112,171.86
$45,319.45
$689,763.05
$644,443.58
5.7 TRC Energy Services 5 April 17, 2018
10/03/2024 D 1 Page 53 of 145
Energy Audit Report I City of Vista Government Facilities DA
3.1 Mechanical Systems
Civic Center
The Vista Civic Center is primarily conditioned by DX packaged units with hot water reheat at their dependent VAV boxes. The hot water is provided by forced draft boilers. Areas of the Civic Center with unique occupancy periods or equipment loads, such as council chambers and server rooms, are served by smaller dedicated AC units. The units are roughly 8 years old and are in good condition.
Tables 4.1 and 4.2 below summarize the site's HVAC equipment. Refer to Attachment D to view the fully detailed existing HVAC system.
Rooftop Packaged DX Unit
L Tag
AC-1
Area Served
Comm Center
Equipment Type
DX Package - VAV
Fan
CFM
16,000
Coolingipment
Capacity
(MBH)
482.4
Capacity
(MBH)
1 259.2
S.P.
(in.wg.j)Nj
2.0 20
W
(GPMl)
17.3 AC-2
Floors 1&2 West
DX Package - VAV
24,000
734.4
388.8
2.0 30
25.9 AC-3
Floor 3
DX Package - VAV
24,000
691.2
388.8
2.0 30
25.9 AC-4
Floor 2 East
DX Package - VAV
24,000
691.2
388.8
2.0 30
25.9 AC-5
Floor 1 East
DX Package - VAV
34,000
994.5
550.8
2.6 50
36.7 AC-6
Council Chambers
DX Package
5,000
157.7
252.0
1.7 5
-
FC-1
Server Room
Split Fan Coil
3,750
89.2 -
0.5 2
FC-2
Server Room
Split Fan Coil
3,750
89.2 0.5
2 FC-3
IT Room
Split Fan Coil
2,500
58.7 0.5
1.5 -
TRC Energy Services 6
10/03/2024 D 1
April 17, 2018
Energy Audit Report I City of Vista Government Facilities Q"NDAG
Wave Water Park
The Wave Water Park's pools are served by (4) circulation pumps and (4) booster pumps. The existing pumps run at a constant speed 24/7 to meet flow requirements dictated by minimum turnover rate while the pools are occupied. When the pools are unoccupied, the existing pump motors are incapable of turning down to meet lower flowrate requirements.
See tables 4.2 and 4.3 below for a summary of the site's pump schedule and occupancy hours. Refer to Attachment A for a full list of existing fixtures and proposed replacements/controls.
Pump/Serves
Competition Pool
Pump Type
Circulation
HP
20 Flowrate
(GPM)
900
Age
10 yrs
5,842
8,760
195
Slides 1 Pump - Flash Flood
Booster
40 3,000
<1 yrs
N/A
Open Hours
N/A
Slides 1 Pump - Salsa Twist
Booster
40 3,000
<1 yrs
N/A
Open Hours
N/A
Slides 2 Booster -Slam Dunk
Booster
25 1,800
<1 yrs
N/A
Open Hours
N/A
Slides 2 Booster - Tubulation
Booster
25 1,800
<1 yrs
N/A
Open Hours
N/A
System
Competition Pool
Off Season
Days
212
Off Season
Hours Open
2,756
Off Season
Hours Closed
2,332
On Season
Days
153
On Season
Hours Open
2,448
On Season
Hours Closed
1,224
Receiving Pool
212
0 5,088
153
2,142
1,530
Lazy River
212
0 5,088
153
2,142
1,530
Children's Pool
212
0 5,088
153
2,142
1,530
Booster 1
212
0 5,088
153
2,142
1,530
Booster 2
212
0 5,088
153
2,142
1,530
The existing pumps run at a constant speed 24/7 to meet flow requirements dictated by minimum turnover rate while the pools are occupied. When the pools are unoccupied, the existing pump motors are incapable of turning down to meet lower flowrate requirements.
TRC Energy Services
10/03/2024
7 D1
April 17, 2018
Energy Audit Report I City of Vista Government Facilities Q40NDAG
3.2 Lighting Systems
The Civic Center's interior is primarily lit by linear fluorescent T8 troffers in offices and hallways, and compact fluorescent lamp can fixtures in lobbies, restrooms, and corridors. The building's exterior, excluding the parking lots, is primarily illuminated by compact fluorescent lamp can fixtures and step lights, as well as bollards.
Civic Center lobby with compact fluorescent lamp can fixtures The Public Works facility is composed of numerous small buildings. Interior areas are primarily lit by 2-lamp 2'x4' fluorescent T8 32W recessed troffers. The majority of the lights are controlled via manual controls, which rely on users to turn on and off. The exterior of the facility is lit mostly by 10OW Metal Halide wall packs, which illuminate parking areas and walkways dusk to dawn. s
}
�r
i'
Public Works corridor with recessed troffers
TRC Energy Services 8 April 17, 2018
10/03/2024 D 1 Page 56 of 145
Energy Audit Report I City of Vista Government Facilities Q40NDAG The Wave Water Park's interior is primarily illuminated by 2-lamp fluorescent T8 32W strip fixtures, but T12 fixtures remain in the snack bar, front office and patio covers. Various lighting fixtures are used to illuminate the park's exterior areas. Special water-resistant Vapor Tight fixtures are used to contain exterior linear fluorescent lamps. The competition pool is lit from underwater by 50OW incandescent pool lamps. Building exteriors are lined with high pressure sodium wall packs, while pool walkways and parking lots are lit by metal halide flood lamps. Decorative mission bell fixture containing metal halide lamps illuminate walkways around the exterior of the park. The lights operate on a schedule that corresponds to the park's seasonal hours.
Water Park flood lights and surface troffers
Table 3.4 below details the most common lamps and fixtures found in each site, broken down by area. For a comprehensive lighting count with additional values, refer to Attachment A.
Location Types
Interior Offices
Lamp Types
Fluorescent T8
Fixture
typesSite
Recessed Troffer
Wattage
59 Fixtures
112
Hours
2470
Manual
Public
Interior Labor
Area
Fluorescent T8
Recessed Troffer
59 33
2470
Manual
Fluorescent T8
Strip
34-68
88 2470
Works
Exterior
MH
Wall Pack
50-100
19 4100
EMS
Scheduling
MH
Flood
100-200
2 4100
Interior Offices
CFL
Recessed Can
33 295
3120
Occupancy
Sensors, EMS
Scheduling
MR16
Wall Wash
37 25
1 3120
Fluorescent T8
Recessed Troffer
59 694
3120
Civic
Center
Interior
Common
Areas
Fluorescent T8
Recessed Troffer
59 155
3120
Occupancy
Sensors, EMS
Scheduling
CFL
Recessed Can
33 264
3120
Fluorescent T8
Strip
59 30
3120
Halogen
Downlight
100
20 3120
PAR
Downlight
70 20
3120
MR16
Wall Wash
37-74
20 3120
Fluorescent T8
Surface Mount
31-64
140
3120
TRC Energy Services 9 April 17, 2018
10/03/2024 D 1 Page 57 of 145
Energy Audit Report I City of Vista Government Facilities �Sd4NDAG
Exterior
Fluorescent
Biax
Bollard
39 49
4100
EMS
Scheduling
CFL
Step Light
18-42
30 4100
FluorescentTS
Pole Mount
64 8
4100
CFL
Wall Pack
40 8
4100
CFL
Recessed Can
33 103
4100
Staff Areas
Fluorescent T8
Strip
59 21
3970
Interior Public
Areas
CFL
Recessed Can
33-52
20 1 2750
Scheduling
Fluorescent T8
Strip
59 32
3970
Water
Pool Lighting
MH
Flood
128-458
31 2885
Incandescent
Underwater
500
37 2885
Park
Other Exterior
Fluorescent T8
Vapor Tight
30 14
1530
Scheduling
HPS
Wall Pack
100
17 3650
MH
Mission Bell
400
9 3650
LPS
Shoebox
248
4 3650
3.3 Controls Systems
The Vista Civic Center's lighting is currently controlled by an Intelligent Lighting Control lighting controls system which is mainly for scheduling. Certain areas within the Center, such as offices, are controlled via wall or ceiling mounted occupancy sensors. Although the Center receives a large amount of sunlight due to its long, curved design, no daylighting controls system is currently installed. The lighting controls system is not integrated into the building's HVAC Energy Management System (EMS) and has no dimming functionality.
The Civic Center's HVAC system is controlled via Alerton energy management system (EMS). The AC units are mainly controlled via their on board controller. However, the scheduling is done through the EMS.
The zone boxes are controlled through the EMS system. The site has roughly 1-3 rooms to a VAV box, which regulate airflow to keep temperatures between 70 and 74 degrees. 20011
@ —�
waignq.\`�i r-
wanmg
waiting :___�
226
75 0 T
21MQIOB
Pa � ran�ng SBCIfI
— _ y
1 ®gI� waihng 74 V T 2O 2128 1
9d/I"""// waiurvu ,T oh 224
21 '?'FB219t22B wanu'9 r
x r
EMS Screenshot with Zoning
TRC Energy Services
10/03/2024
0 D1
April 17, 2018
Energy Audit Report I City of Vista Government Facilities Q40NDAG
3.4 Lighting Energy Efficiency Measures (EEM)
EEM 1— Replace and retrofit exterior fixtures with new LED fixtures and retrofit kits NOTE: This exterior lighting currently does not receive incentivizes from SANDAG, but may be revisited in Quarter 2 of 2018.
The Public Works facility and Wave Water Park have exterior parking lots and walkways illuminated by metal halide and high pressure sodium wall packs and pole -mounted area lights. The Civic Center's exterior walkways are lit by CFL Can downlights. This measure recommends to replace and retrofit all HID and CFL fixtures with equivalent LED fixtures.
The proposed LED fixtures feature equivalent or greater lighting output than the existing fixtures, thus maintaining or improving lighting levels while reducing energy consumption by roughly 70%. Additionally, they offer truer color rendering values than conventional area lighting methods, which is useful for nighttime visibility and security. LED lights also reduce maintenance costs associated with bulb replacement due to their significantly longer lifespans, which is especially applicable to elevated lights which require extra time to replace. Proposed LED exterior fixtures offer reduced uplight, backlight, and glare due to their directional design, which reduces light pollution. The proposed LED fixtures are found on the Design Lights Consortium (DLC) and Energy Star (ES) Qualified Product Lists.
Table 3.5 below details the main fixtures proposed by this measure. Refer to Attachment A for a full list of exisung
Public
Timures
Location
Types
ana pro osea re iacememsiconTrois.
ProposedSite
LED Type
RAB wall pack
LED Wattage
40 Total Fbrtures
19 Hours
ip
4100
..
Controls
Works
Exterior
RAB flood light
80 2
4100
Basic Sensors
Civic Center
Exterior
RAB wall pack
12 8
4100
EMS Scheduling
Pool
RAB flood light
80-150
31 2885
EMS Scheduling
Maxlite Vapor Tight Linear
30 14
1530
Water Park
Other
RAB wall pack
40 17
3650
Basic Sensors,
Exterior
Remphos retrofit module
150
9 3650
EMS Scheduling
RAB Area light
80 4
3650
In some cases, this measure triggers 2016 Title 24 Code, thus will require additional Title 24 compliant controls. Timeclocks or photocells currently control the exterior fixtures. This measure proposes that that the luminaires included in this measure, which trigger code, feature fixture integrated occupancy based dimming controls that reduce light levels when the space is unoccupied.
TRC Energy Services 11 April 17, 2018
10/03/2024 D 1 Page 59 of 145
Energy Audit Report I City of Vista Government Facilities Q40NDAG
On -bill savings are based on the actual annual operating hours for the exterior zones. Refer to Attachment A for more details on the actual operating hours of the different areas of the facility. The IOU program savings are based on the applicable statewide workpapers. This measure is eligible for incentives under SDGE midstream incentive type — Exterior LED.
EEM 2 — Replace and retrofit interior fluorescent troffers with new LED fixtures and LED retrofit kits
Public
145 19,263 7.87
Works
EEM-2: LED Civic
Troffers Center
849 100,988 34.94
TOTAL
994 120,251 42.81
19,263 1 7.87 1 $4,334.18 1 $3,625.00 1 $44,467.70 1 $40,842.70 9.4 100,988 1 34.94 1 $19,590.39 1 $21,225.00 1 $210,977.25 1 $189,752.25 120,251 1 42.81 1 $23,924.57 1 $24,850.00 1 $255,444.95 1 $230,594.95
9.7 9.6
The interiors of the sites are lit primarily by linear fluorescent T8 and T12 recessed and surface mounted troffers. This measure recommends to retrofit all fluorescent recessed and surface mounted troffers with equivalent LED fixtures.
LED retrofit kits are a cost effective conversion that eliminate the need for a full fixture replacement. The proposed LED fixtures and retrofit kits feature equivalent or greater lighting output than the existing fixtures, thus maintaining or improving lighting levels while reducing energy consumption by roughly 60%. In addition to consuming less energy, LED lights reduce maintenance costs associated with bulb replacement due to their significantly longer lifespans- the proposed LED troffers are rated for over 50,000 hours and come with 5 year warranties, nearly double the lifespan of typical linear fluorescent lamps. Because they convert energy into light at a greater efficiency, they also emit less waste heat into building interiors, reducing cooling loads. The proposed LED fixtures and retrofit kits are all found on the Design Lights Consortium (DLC) Qualified Product List, meaning they meet premium quality standards and qualify for SDGE lighting upgrade incentives.
Table 3.6 below details the main fixtures proposed by this measure. Refer to Attachment A for a full list of existina fixtures and Droposed replacements/controls.
Interior Offices
26-39 1
112
2470
Basic Sensors
Public Works
Manual
Interior Labor Area
Lithonia
volumetric
26-39
33 2470
Lutron Occupancy
Civic Center Interior Offices
retrofit kit
26 39
26-39
694
20 3120
2750
& Daylighting
Water Park Interior Public Areas
EMS Scheduling
Parts of this measure including office spaces and corridors trigger 2016 Title 24 Code, and will require additional Title 24 compliant controls such as dimming controls in most of the spaces. The majority of the existing fixtures included in this measure are turned on manually and do not feature any occupancy or dimming controls. For Public Works and Wave Water Park, this measure considered the additional cost to install dimming switches and occupancy controls, which reduce light levels when the space is unoccupied, in areas where applicable. Vista Civic Center's proposed controls are considered in a separate measure.
TRC Energy Services 12 April 17, 2018
10/03/2024 D 1 Page 60 of 145
Energy Audit Report I City of Vista Government Facilities Q40NDAG EEM 3 — Replace and retrofit recessed can CFLs with recessed can LED retrofit kits Water 20 708 0.22 433 0.16 $150.91 $140.00 $2,700.96 $2,560.96 17.0 EEM-3: Park
Commercial Civic 618 55,367 18.15 55,367 18.15 $9,228.32 $4,165.00 $60,901.94 $56,736.94 6.1 LED CAN Center
TOTAL 638 56,075 18.37 55,800 18.31 $9,379.24 $4,305.00 $63,602.90 $59,297.90 6.3 Recessed can CFLs can be found on all the sites in areas such as restrooms, lobbies, storage rooms, and corridors. The majority of the fixtures contain 6" 32W CFLs. This measure recommends replacing the CFL can fixtures with equivalent LED retrofit kits.
LED retrofit kits eliminate the need for a full fixture replacement by converting existing fixtures into LED - compatible units. The proposed LED retrofit kits reduce energy consumption by roughly 60% while outputting equal or
greater lumens than the existing fixtures, thereby maintaining or improving lighting levels while consuming less energy. While CFLs have lifespans of roughly 8,000 hours, the proposed LED retrofits have lifespans of 50,000 hours. This 525% increase in lifespans translates to reduced maintenance costs associated with bulb replacement. Because LEDs convert energy into light at a greater efficiency, they also emit less waste heat into building interiors, reducing cooling loads. The proposed LED retrofit kits are all found on the Design Lights Consortium (DLC) and Energy Star (ES) Qualified Product List, meaning they meet premium quality standards and qualify for SANDAG lighting upgrade incentives.
Table 3.7 below details the main fixtures proposed by this measure. Refer to Attachment A for a full list of existina fixtures and proposed replacements/controls.
Interior Offices
12-42
1 295
3120
Lutron Occupancy &
Civic Center Interior Common Areas Lithonia
12-42
264
3120
Daylighting
recessed can
103
3120
EMS Scheduling
Exterior retrofit kit
12-42
20 2750
EMS Scheduling
Water Park Interior Public Areas 12-42
Parts of this measure including office spaces and corridors trigger 2016 Title 24 Code, and will require additional Title 24 compliant controls such as dimming controls in most of the spaces. The majority of the existing fixtures included in this measure are turned on manually and do not feature any occupancy or dimming controls. For Public Works and Wave Water Park, this measure considered the additional cost to install dimming switches and occupancy controls, which reduce light levels when the space is unoccupied, in areas where applicable. Vista Civic Center's proposed advanced controls are considered in a separate measure.
On -bill savings are based on the actual annual operating hours of the buildings. Refer to Attachment A for more details on the actual operating hours of the different areas of the facility. The IOU program savings are based on the On -Bill savings and the incentives have been calculated based on applicable statewide workpapers. This measure is eligible for incentives under SDGE midstream incentive type — Commercial LED CAN.
TRC Energy Services 13 April 17, 2018
10/03/2024 D 1 Page 61 of 145
Energy Audit Report I City of Vista Government Facilities Q41NDAG EEM 4 — Upgrade fluorescent MR16 lamps to LED MR16 lamps NOTE: LED MR16 lamps are no longer incentivized by SDG&E.
On -Bill Savings IOU Program Savings
Electric Electric Annual Project Net 4Payba
Electricity Electricity Potential
Solution Savin s Demand Savings Demand Utility Cost Incentive Implementation Implementation Code Building0 g Reduction g Reduction Savings Cost Cost ��M(kWh/yr) (kW) (kWh/yr)l� ($/yr) $) ($) $) EEM-4: LED The Civic Center's lobbies contain 37W fluorescent MR16 wall wash fixtures, used both for illumination and aesthetic appeal. This measure recommends replacing the fluorescent MR16 bulbs with equivalent LED MR16 bulbs.
The proposed LED bulbs feature equivalent or greater lighting output than the existing bulbs, thus maintaining or improving lighting levels while reducing energy consumption by roughly 70%. LEDs are capable of producing more natural looking light, which is especially applicable for MR16 scenarios which often involve spotlighting certain displays. In addition to consuming less energy, LED lights realize further savings by reducing maintenance costs associated with bulb replacement due to their significantly longer lifespans. Because they convert energy into light at a greater efficiency, they also emit less waste heat into building interiors, reducing cooling loads. The proposed LED fixtures are all found on the Energy Star (ES) Qualified Product List.
Table 3.8 below details the main fixtures proposed by this measure. Refer to Attachment A for a full list of existing fixtures and proposed replacements/controls.
On -bill savings are based on the actual annual operating hours of the buildings. Refer to Attachment A for more details on the actual operating hours of the different areas of the facility. This measure is eligible for incentives under SDGE midstream incentive type — LED MR16.
TRC Energy Services 14 April 17, 2018
10/03/2024 D 1 Page 62 of 145
Energy Audit Report I City of Vista Government Facilities QSANDAG EEM 5 — Upgrade non-incentivized miscellaneous lighting to LED Miscellaneous lighting around the three sites is provided by inefficient lamps and fixtures that do not fit into existing SDGE incentive groups, such as the Wave Water Park's incandescent underwater pool lighting.
This measure recommends replacing these lamps and fixtures with equivalent LED products.
The proposed LED replacements will reduce energy consumption by roughly 60% while maintaining equal or greater lighting output and increasing color quality. LED lights reduce maintenance costs associated with bulb replacements, feed less waste heat into interior buildings, and produce less light pollution such as glare. Proposed LED Biax, T8 and T5 lamps utilize line voltage directly, so existing ballast types will not persist after the retrofit.
Table 3.9 below details the main fixtures proposed by this measure. Refer to Attachment A for a full list of existing fixtures and proposed replacements/controls.
" WE
"Types"rop
LED
Tota I
Annual
Site
Location
sedLED Type
Cree suspended surface mount
Wattage
23 Fixtures
88 Hours
2470
Controls
Manual
Public Works
Public Work Area
Philips CorePro linear US
14 20
3120
Lutron
Interior Common
Occupancy &
Cree suspended surface mount
23 47
3120
Civic Center
Areas
Daylighting
Remphos T8 tube
15 140
3120
Philips Biax lamp
11 49
3120
EMS Scheduling
Exterior
Remphos T5 tube
14 8
3120
EMS Scheduling
Interior Staff Areas
Cree suspended surface mount
23 68
3972
Basic Sensors,
Water Park
Scheduled
Pool Lighting
J&J Electronics Pool Light
58 37
2885
Scheduled
Many of the existing fixtures included in this measure are turned on manually and do not feature any occupancy or dimming controls. This measure considered the additional cost to install dimming switches and occupancy controls, which reduce light levels when the space is unoccupied, in areas where new lighting controls are already being installed.
On -bill savings are based on the actual annual operating hours of the buildings. Refer to Attachment A for more details on the actual operating hours of the different areas of the facility. This measure not eligible for incentives.
TRC Energy Services 15 April 17, 2018
10/03/2024 D 1 Page 63 of 145
Energy Audit Report I City of Vista Government Facilities �SANDAG
EEM 6 — Implement Advanced Lighting Controls
EEM-6: Civic 793 45,854 11.36 45,854 11.36
Advanced Center
Lighting
Controls TOTAL 793 45,854 11.36 45,854 11.36
$7,204.97 $1,375.61 $107,143.23 $105,767.62 14.7
$7,204.97 $1,375.61 $107,143.23 $105,767.62 14.7
Conventional lighting systems are manually controlled on/off by users, which leaves a significant margin for wasted energy. Users will leave lights on in unoccupied rooms, lighting fixtures will over -light spaces, and the system cannot dynamically react to sunlight entering its space.
The City is interested in advanced lighting controls at the Civic Center. The Lutron advanced lighting controls package proposed in this audit will include high -precision occupancy sensors equipped with advanced motion sensors capable of detecting miniscule movements. The sensors will turn off their dependent lighting fixtures when they sense that their space is unoccupied. The system can be integrated into the building's existing Allerton Energy Management System (EMS) and will control dependent lighting fixtures, allowing the fixtures' power to be tuned down to prevent over -lighting. The system can be programmed to operate along with the sites existing Demand Reduction plans. Finally, daylighting sensors will measure light entering through windows and will dim surrounding lights accordingly, to save energy and maintain a natural level of light throughout the facility.
Table 3.10 below details the equipment proposed by this measure. Refer to Attachment A for a full list of existing and proposed controls equipment.
Power Pack
Power delivery and dimming
274
Occupancy Sensor - Wall
General purpose
20 30%
Occupancy Sensor - Ceiling
Used in corridors
229 30%
Smart Switch
Switch with dimming controls
224 -
Daylighting Sensor
Dims fixtures relative to natural window light
46 5%
Tuning
Lighting output calibration
232 14%
�5 y
Lutron Vive ceiling occupancy sensor and wireless hub
TRC Energy Services 16 April 17, 2018
10/03/2024 D 1 Page 64 of 145
Energy Audit Report I City of Vista Government Facilities �SONDAG
On -bill savings are based on the actual annual operating hours of the buildings. Refer to Attachment A for more details on the actual operating hours of the different areas of the facility, as well as a detailed schedule of existing and proposed equipment. Equipment was selected to comply with Title 24 2016 requirements.
Savings as a result of tuning and daylighting sensors are eligible for incentives under SDGE targeted incentive type — Lighting — Interior Lighting Controls.
TRC Energy Services
10/03/2024
17 D1
April 17, 2018
Energy Audit Report I City of Vista Government Facilities Q4PNDAG
3.5 Mechanical Energy Efficiency Measures (EEM)
EEM 7 — Install variable frequency drives on Wave Water Park pool pumps EEM 7: Water 118,847 6.96 118,847
Non- Park
HVAC
VFD TOTAL 118,847 6.96 118,847
6.96 1 $33,396.01 1 10,551.76 1 72,576.96 1 62,025.20
6.96 1 $33,396.01 1 $10,551.76 1 $72,576.96 1 $62,025.20
1.9 1.9
An ideal solution for meeting the minimum flow requirements of the filter, heater, and chemical control without using the excessive energy required to meet turn -over requirements is implementing variable frequency drive (VFD) control on the pump motor. VFD control on a pump motor can allow for reduced motor speeds and therefore reduced pumping during closed periods and full pumping capacity during open hours to the public. It is recommended that the pool pump motor VFD be operated in such a way that only the minimum flow requirement is met while the pool is closed and operate at the required turn -over rate while the pool is open. As a part of this scope, the old electric motors will be replaced with new premium efficient inverter duty motors.
Pool pump motor VFDs can be controlled in one of two ways, constant speed or constant flow. The constant speed approach involves having the VFD scheduled to operate the motor at a set speed once the pool closes. The constant flow approach involves the VFD working in unison with a flow meter to maintain a scheduled amount of flow. TRC recommends using the constant flow option as it is the best approach for maintaining energy savings and ensuring that turn -over requirements are being met. The savings calculations have been set up using a conservative 20% reduction in flow during closed periods. It is recommended that this lower flow boundary be explored in small increments, seeing how the equipment reacts to the reduced flow. The lower the flow setting, the more energy savings that can be obtained.
Table 3.11 below details the equipment proposed by this measure. Refer to Attachment B for a full breakdown of existina and proposed eauioment, as well as ooeratina hours.
Competition Pool 20 900 837 (93%) 5,204 6.00 675 (75%) 3,556 7.40 Receiving Pool 15 600 408 (68%) 2,142 1.57* 408 (68%) 6,618 1.57* Lazy River 15 600 408 (68%) 2,142 6.00 408 (68%) 6,618 6.00 *Note: Minimum turnover rate for receiving pool is less than 6 hours because of the minimum filter flow rate required.
This measure considered the additional cost to install flow sensors and powered interlocks to control the variable frequency drives.
This measure triggers Title 22 code- Division 4 Chapter 20 requiring specific turnovers for each pool while occupied. On -bill savings are based on the actual annual operating hours of the site. Refer to Attachment B for more details on the actual operating hours of the different areas of the facility. The existing equipment is used as baseline and no ISP is applicable. This measure is eligible for incentives under the SDGE targeted solutions "Non-HVAC VFD" and "Motors — Non HVAC Motors".
TRC Energy Services 18 April 17, 2018
10/03/2024 D 1 Page 66 of 145
Energy Audit Report I City of Vista Government Facilities �SANDAG
EEM 8 —Optimal Start/Stop
EEM 8: Civic 3,620 1.42 3,620 1.42 $796.38 $289.59 $4,700.63 Optimal Center
Star/Stop TOTAL 3,620 1 1.42 1 3,620 1 1.42 1 $796.38 1 $289.59 1 $4,700.63 $4,411.03 5.5
$4,411.03 5.5
The air conditioning units (ACs 2-5) serving Civic Center main building are typically scheduled from 4 am to 5 pm. The unit (AC 1) serving the community center building is scheduled from 6 am to 6 pm. The units are started earlier than the building business hours to bring the building zones at its set points at the start of business hours. This existing control strategy of fixed scheduling leaves room for optimization to unit run times.
This measure recommends implementing automated optimal start/stop control strategy through the Civic Center's Alerton EMS. As a part of this control strategy, the existing unit schedules will be maintained, but the unit activation will be dynamically decided by the control system. The control system will monitor the building loads and activate the air conditioning units between the scheduled hours, while maintaining the zone temperatures within its set points. This strategy will reduce the air handling units' operating hours resulting in reduction in energy use.
Refer to Attachment D for more details on HVAC controls savings calculations, including equipment and scheduling. This measure is eligible for incentives under the SDG&E targeted solution "HVAC — Controls/Controlling Equipment".
TRC Energy Services 19 April 17, 2018
10/03/2024 D 1 Page 67 of 145
Energy Audit Report I City of Vista Government Facilities Q4PNDAG EEM 9 — Implement Occupancy -Based Zone Setback Controls The Civic Center has (130) HVAC zones. The HVAC system is currently scheduled at unit level. The units serving the main building are scheduled from 4 am to 5 pm. The unit serving community center is scheduled from 6 am to 6 pm. The zones are maintained at their occupied cooling and heating setpoints irrespective of their occupancy during the business hours.
This measure recommends implementing zone setback controls based on the occupancy. Zones with dedicated thermostats such as conference rooms, office areas and the community center spaces will be targeted. Zones that have multiple areas controlled by a single thermostat will be excluded from this measure.
As a part of this control strategy, the Lutron Vive system will provide occupancy inputs to the Alerton control system. If no occupancy is detected for 30 minutes the control system will increase the temperature deadband in unoccupied zones and force the associated VAV boxes to their minimum flow set point. The proposed occupied hours setback temperature set points will be programmed such that the zone can be brought back to occupied mode temperatures to prevent any discomfort to occupants. Savings are realized by reduction in cooling and heating energy.
Refer to Attachment D for more details on HVAC controls savings calculations, including equipment and scheduling. This measure is eligible for incentives under the SDG&E targeted solution "HVAC — Controls/Controlling Equipment".
TRC Energy Services 20 April 17, 2018
10/03/2024 D 1 Page 68 of 145
Energy Audit Report I City of Vista Government Facilities DA Attachments
Attachment A — Lighting Calculations: Lighting Calculations Vista w SDGE Midstream.xlsx Attachment B — VFD Calculations: Wave WP- Pool Pump VFDs.xlsx Attachment C — Spec Sheets: Spec Sheets -zip
Attachment D — eQuest Package: eQuest Package.zip
TRC Energy Services
10/03/2024
21 D1
April 17, 2018
CTRC
Results you can rely on
I
Prepared by
Stephen Brett Reno
Lake Casco, PE
TRC Energy Services
9685 Research Drive
Irvine, CA 92618
City of Vista
200 Civic Center Dr.,Vista, CA 92084
�SANDAG
Comprehensive Energy Audit Report
August 8, 2018
10/03/2024 D 1 Page 70 of 145
Energy Audit Report I City of Vista Fire Stations Q"NIMG Table of Contents
1. Purpose of the Audit.............................................................................................................................. 2 2. Facility Descriptions............................................................................................................................... 3 3. Energy Savings and Cost Summary...................................................................................................... 5 3.1 Mechanical Systems............................................................................................................................7
3.2 Lighting Systems...............................................................................................................................13
3.1 Process Systems...............................................................................................................................17
3.2 Lighting Energy Efficiency Measures (EEM)..................................................................................... 18 EEM 1 — Retrofit existing fluorescent troffers with LED equivalents................................................... 18 EEM 2 — Upgrade 4' linear fluorescent lamps to LED......................................................................... 19 EEM 3 — Replace existing HID exterior fixtures with LED exterior fixtures.........................................20 EEM 4 — Unincentivized LED Upgrades..............................................................................................21 EEM 5 — Implement Advanced Lighting Controls................................................................................ 22 3.3 Mechanical Energy Efficiency Measures (EEM)............................................................................... 23 EEM 6 — HVAC system maintenance..................................................................................................23 Refrigerant Charge Adjustment..................................................................................................... 23 Airflow Adjustment........................................................................................................................ 23 Evaporator & Condenser Coil Cleaning.........................................................................................24 EEM 7 — New Evaporator Fan Motors with Variable Air Volume Control ............................................ 25 EEM 8 — Implement Occupancy Setback Controls..............................................................................26
3.1 Process Energy Efficiency Measures (EEM).....................................................................................27 EEM 9 — Faucet aerators and low -flow showerheads......................................................................... 27 EEM 10 — Upgrade diesel generators with circulating block heaters .................................................. 28 Attachments................................................................................................................................................ 29 TRC Energy Services 1 August 8, 2018
10/03/2024 D 1 Page 71 of 145
Energy Audit Report I City of Vista Fire Stations (AMNDAG
1. Purpose of the Audit
TRC Energy Services has completed audits for Lighting, Mechanical, Controls and Process measures for six fire stations located within the City of Vista and identified energy efficiency opportunities that have the potential to reduce total utility costs by $45,937 annually, while also improving building comfort and safety, and reducing maintenance workload. This report details the audit findings and their opportunities.
The City may be able to implement some of the recommended measures without detailed engineering.
Other measures will require more detailed engineering analysis of feasibility and constructability. This study does not include specific design instructions and is not intended as a design document. Projects have not been developed to design level. The design professional or other persons following the recommendations shall accept responsibility and liability for the results.
As technical consultants TRC Energy Services remains product and vendor neutral. The products presented in this report represent examples of the possible products that could be used for the project. The products were chosen based on their technological feasibility, efficiency and impact on the project economics. The analysis herein is based on the performance and pricing of these particular products. It should be noted that if the City would like to move forward with products other than those shown in this report, the analysis would need to be revised based on updated product performance and costs.
Acknowledgments
Special thanks to Keith Gardner and Mickey Romero of the City of Vista, Anna Lowe of the San Diego Association of Governments (SANDAG), as well as Adrian Salas and Chris Nanson of San Diego Gas & Electric (SDGE) for all their help and cooperation throughout the audit and reporting process.
TRC Energy Services 2 August 8, 2018
10/03/2024 D 1 Page 72 of 145
Energy Audit Report I City of Vista Fire Stations
Q"NDAG
2. Facility Descriptions
The scope of this audit report covers (6) fire stations, discussed below.
Site
Fire Station No.1
Address
175 N. Melrose Dr., Vista, CA 92083
SA Number
7547289026
159,482
1,202
Fire Station No.2
1050 Valley Dr., Vista, CA 92084
2040379273
43,375
343
Fire Station No.3
1070 Old Taylor St., Vista, CA 92084
2622684826
49,622
521
Fire Station No.4
2121 Thibodo Rd., Vista, CA 92081
4234597921
59,417
767
Fire Station No.S
2009 S. Melrose Dr., Vista, CA 92081
3345058525
115,264
1,189
Fire Station No.6
651 E. Vista Hwy., Vista, CA 92084
3167775370
112,987
1,612
III:
Fire Station 2
u
Fire Station 1 is a 11,290 sqft site that houses staff 24 hours a day. The building has a large garage to house support
vehicles and equipment. Around the exterior of the building is a substantial amount of outdoor parking.
The spaces are conditioned by two split system AC units and two packaged AC units equipped with gas heating. The two split system units are controlled manually, while the two packaged units are integrated into a Carrier CCNWeb Energy Management System (EMS). The building's interior is lit by linear fluorescent T8 fixtures. The exterior of the building is illuminated by metal halide and compact fluorescent flood and wall pack fixtures.
Fire Station 2 is a 4,260 sqft facility built to house staff at all times. As this site is slated for demolition, only measures with very low payback periods were proposed. The garage, which houses both equipment and vehicles, sits adjacent to the offices and living spaces.
The spaces are conditioned by two interior heating ventilation units, and one rooftop packaged AC unit equipped with gas heating. This station is not controlled by the central EMS and relies on manual HVAC control. The building's interior is lit linear T8 and T12 fluorescent fixtures. The exterior of the building is illuminated by metal halide and compact fluorescent wall pack fixtures.
Fire Station 3 is a 4,998 sqft building that houses firefighter staff 24/7. As this site is slated for demolition, only measures with very low payback periods were proposed. The garage, constructed for vehicles and equipment, takes up the center of the site, with offices and living spaces on the side.
The spaces are conditioned by one window AC unit and two packaged AC units equipped with gas heating. This station is not controlled by the central EMS and relies on manual HVAC control. The building's interior is lit linear T8 and T12 fluorescent fixtures. The exterior of the building is illuminated by metal halide and LED flood and wall pack fixtures.
TRC Energy Services 3 August 8, 2018
10/03/2024 D 1 Page 73 of 145
Energy Audit Report I City of Vista Fire Stations
Q"NDAG
Fire Statinn 4
Fire Station 6
Fire Station 4 is a 6,977 sqft facility built to house firefighters at all times of day. The firehouse's garage is located in the center, with living spaces, offices, and a gym located on both sides.
The spaces are conditioned by one split AC system and two rooftop packaged AC units equipped with gas heating. All of the conditioning units are controlled manually with no
integration to the central EMS. The building's interior is lit linear T8 and T12 fluorescent fixtures. The exterior of the building is illuminated by metal halide and LED flood and wall pack fixtures.
Fire Station 5 is the largest of the fire stations audited at 13,628 sqft. The building contains living spaces, offices, exercise facilities, and a large garage space for vehicle and equipment storage.
The spaces are conditioned by two split AC system and four rooftop packaged AC units equipped with gas heating. The packaged units are controlled via the central EMS while the split systems are controlled manually. A single 100 gal domestic hot water heater serves the site's hot water needs.
The building's interior is lit linear T8 fluorescent fixtures, CFL high bay fixtures, and skylights. The exterior of the building is illuminated by metal halide and CFL wall pack fixtures.
Fire Station 6 is 11,305 sqft site that houses staff 24 hours a day. The building has a large garage to house support
vehicles and equipment. Around the exterior of the building is outside parking and a yard.
The spaces are conditioned by one split system AC unit and three packaged AC units equipped with gas heating. The one split system units is controlled manually, while the three packaged units are controlled by the central EMS. One 100 gallon hot water heater supplies hot water to the site. The building's interior is lit linear fluorescent T8 fixtures and skylights. The exterior of the building is illuminated by metal halide and CFL wall pack fixtures.
TRC Energy Services
10/03/2024
4 D1
August 8, 2018
Energy Audit Report I City of Vista Fire Stations
(AMNDAG
3. Energy Savings and Cost Summary
Based on the site audits, TRC identified various energy efficiency measures. Measures were subdivided into the following categories:
1. Lighting Systems
All measures involving the illumination of the fire stations.
2. Mechanical Systems
All measures involving the fire stations' HVAC systems.
3. Process Systems
All measures related to non-HVAC equipment operations at the stations.
TRC did not consider onsite generation technologies such as renewable energy as a part of this study.
Also, the audited sites are not enrolled in any SDGE demand generation (DG), demand response (DR), or permanent load shifting (PLS) programs.
Table 3.1 below lists all the measures identified with project implementation economics. The tables estimated the annual utility savings based on a blended utility rate. Please find additional details on each measure in the Energy Efficiency Measure Description section below.
Code
Building
City
Savings
Electric
Demand
Natural
Gas
Annual
TotalElectricity
Incentive
Project
Payback
(kWh)
Reduction
Savings
Savings
Cost
Cost
PeriodSolution
FS-1
95 28,558
4.47 -106
$2,654
$1,279
$31,394
$30,115
11 EEM-1:
Upgrade
FS-4
50 5,398
1.89 -51
$1,156
$680
$16,661
$15,981
14 Fluorescent
Troffers to
FS-5
31 5,976
0.98 -54
$577
$349
$6,985
$6,636
11 LED
FS-6
53 13,582
2.20 -92
$1,268
$520
$13,999
$13,480
11 FS-1
2 249
0.04 0
$20
$10
$63
$53
3 FS-2
55 12,783
2.01 -53
$966
$275
$2,808
$2,533
3 EEM-2:
Upgrade
FS-3
48 14,934
2.38 -65
$1,138
$240
$3,107
$2,867
3 Linear
Fluorescent
FS-4
8 399
0.17 -1
$79
$40
$251
$211
3 Lamps to LED
FS-5
4 572
0.10 -6
$47
$20
$126
$106
2 FS-6
6 860
0.14 -9
$66
$30
$189
$159
2 EEM-3:
FS-1
1 591
0.13 0
$69
$35
$524
$489
7 Upgrade
Exterior
FS-4
3 927
0.23 0
$134
$95
$1,588
$1,493
11 Fixtures to
LED
FS-6
2 1,186
0.27 0
$139
$70
$891
$821
6 FS-1
196
34,070
5.73 -74
$3,214
$0
$30,295
$30,295
9 FS-2
41 8,358
1.72 -6
$866
$0
$4,624
$4,624
5 EEM-4:
Unincentivized
FS-3
77 15,181
2.73 -54
$1,406
$0
$8,450
$8,450
6 LED Upgrades
FS-4
80 13,537
3.52 -3
$2,156
$0
$29,523
$29,523
14 FS-5
180
34,651
6.46 -76
$3,453
$0
$26,584
$26,584
8 TRC Energy Services 5 August 8, 2018
10/03/2024 D 1 Page 75 of 145
Energy Audit Report I City of Vista Fire Stations
On
ectricity
18,918
-Bill
Electric
Demand
Reduction
3.39 Natural
I Gas
Savings
-43
Annual
..Payback
Savings
$1,794
l
$0
Project
Cost
$12,885
Net
Cost
$12,885
.-
Net
Periode
7 Solution ..Incentive
Building
MJ§avings
FS-6
121
FS-1
80 13,190
0.63 0
$678
$0
$17,322
$17,322
26 EEM 5:
FS-4
22 6,500
0.74 0
$488
$0
$7,066
$7,066
14 Lighting
Controls
FS-5
46 8,667
0.45 0
$440
$0
$10,275
$10,275
23 FS-6
40 7,438
0.28 0
$307
$0
$7,444
$7,444
24 FS-1
1 3,567
7.74 89
$668
$0
$2,406
$2,406
4 FS-2
1 298
0.64 4
$53
$0
$235
$235
4 EEM 6: HVAC
FS-3
1 1,110
2.41 28
$208
$0
$749
$749
4 System
Maintenance
FS-4
1 1,415
3.02 19
$252
$0
$1,117
$1,117
4 FS-5
1 2,419
5.23 53
$448
$0
$1,700
$1,700
4 FS-6
1 2,457
5.25 32
$439
$0
$1,941
$1,941
4 EEM
FS-1
2 20,728
6.85 2
$3,494
$3,109
$10,029
$6,919
2 7: New
Variable Air
FS-4
3 8,752
2.89 1
$1,475
$1,313
$27,413
$26,100
18 Volume
Evaporator Fan
FS-5
4 21,189
7.00 2
$3,572
$3,178
$20,057
$16,879
5 Motors
FS-6
4 15,201
5.02 1
$2,562
$2,280
$20,057
$17,777
7 FS-1
1 12,342
0.00 0
$2,080
$987
$4,145
$3,158
2 EEM 8:
FS-4
1 4,602
0.00 0
$775
$368
$4,145
$3,777
5 Occupancy
Setback
FS-5
1 12,970
0.00 0
$2,185
$1,038
$7,255
$6,217
3 FS-6
1 8,577
0.00 0
$1,445
$686
$6,218
$5,532
4 FS-1
11 0
0.00 41
$31
$120
$403
$283
9 EEM rs &Low Faucet
Aerators
FS-4
6 0
0.00 21
$16
$60
$210
$150
9 Flow
Showerheads
FS-5
10 0
0.00 31
$23
$80
$316
$236
10 FS-6
10 0
0.00 31
$23
$80
$316
$236
10 FS-1
1 2,559
0.43 0
$431
$0
$1,117
$1,117
3 FS-2
1 3,520
0.59 0
$593
$0
$1,008
$1,008
2 EEM 10:
FS-3
1 3,520
0.59 0
$593
$0
$1,008
$1,008
2 Circulating Block
Heaters
FS-4
1 3,520
0.59 0
$593
$0
$1,008
$1,008
2 FS-5
1 2,559
0.43 0
$431
$0
$1,117
$1,117
3 FS-6
1 2,559
0.43 0
$431
$0
$1,117
$1,117
3 1,307
380,387
89.76 -338
$45,937
$16,942
$348,141
$331,199
7.2 TRC Energy Services 6 August 8, 2018
10/03/2024 D 1 Page 76 of 145
Energy Audit Report I City of Vista Fire Stations (AMNDAG
3.1 Mechanical Systems
Fire Station 1 has its HVAC system controlled via Carrier CCNWeb EMS, Stations 5 and 6 are controlled via the city's central Alerton EMS, and Fire Stations 4 is scheduled for EMS integration as well. The energy management systems control seasonal heating/cooling setpoints, economizer settings, and supply air temperatures. Thermostats in stations integrated with EMS controls have three temperature control settings: Cooling, Heating, and Off.
Fire Station 1
Fire Station 1 is conditioned by two rooftop packaged AC units equipped with gas heating and two split system AC units. The packaged AC units are controlled by via Carrier CCNWeb EMS and are equipped with economizers. The packaged units currently service their dependent zones with constant speed supply fan motors and no occupancy setback controls. Hot water is supplied to Fire Station 1 by a 100 gallon Cyclone XL domestic hot water heater, with an input capacity of 250,000 Btu/h.
The tables below summarize the site's HVAC equipment. Refer to Attachment B to view the fully detailed existing HVAC system.
Packaged AC Unit — Gas Heating
Tag
Area Served
Equipment Type
Make
Cooling..
CapacityEquipment
..
AC-1
IT Room
Split System AC
Liebert
Unknown
I Unknown
n/a
n/a
AC-2
Gym
Split System AC
Mitsubishi
42,000
9.1 n/a
n/a
1st floor: Hallways,
Package Unit AC-
AC-3
York
60,000
12.2 81,000
81%
Offices, & Training Rm
Gas Heating
2nd floor: Kitchen &
Package Unit AC-
AC-4
York
210,000
11.0 240,000
80%
Dorms
Gas Heating
TRC Energy Services 7 August 8, 2018
10/03/2024 D 1 Page 77 of 145
Energy Audit Report I City of Vista Fire Stations
C"NDAG
Fire Station 2
Fire Station 2 is conditioned by one packaged AC unit in the attic and two heating ventilation units. All the units are equipped with gas heating and are controlled manually rather than by the central EMS. The packaged unit currently services its dependent zones with a constant speed supply fan motor and no occupancy setback controls. The station receives hot water from one 81 gallon domestic hot water heater and one 30 gallon domestic hot water heater, with input capacities of 199,000 Btu/h and 32,000 Btu/h.
The tables below summarize the site's HVAC equipment. Refer to Attachment B to view the fully detailed existing HVAC system.
Packaged AC Unit — Gas Heating
TRC Energy Services 8 August 8, 2018
10/03/2024 D 1 Page 78 of 145
Energy Audit Report I City of Vista Fire Stations
Q"NDAG
Fire Station 3
Fire Station 3 is conditioned by two packaged AC units equipped with gas heating and one window AC unit.
All the units are controlled manually and are not integrated with the central EMS. The packaged units are not controlled by occupancy setback controls and supply air to their dependent zones at a constant volume.
One 75 gallon domestic hot water heater with an input capacity of 76,000 Btu/h provides hot water to the fire station.
The tables below summarize the site's HVAC equipment. Refer to Attachment B to view the fully detailed existing HVAC system.
Packaged AC Unit — Gas Heating
TRC Energy Services 9 August 8, 2018
10/03/2024 D 1 Page 79 of 145
Energy Audit Report I City of Vista Fire Stations
Q"NDAG
Fire Station 4
Fire Station 4 is conditioned by three packaged AC units equipped with gas heating and one window AC unit. The packaged units have no occupancy setback integration and supply air to their dependent zones at a constant flowrate. All the units are controlled manually, not by the central EMS. Hot water is supplied to Fire Station 4 by one 81 gallon domestic hot water heater with an input capacity of 154,000 Btu/h.
The tables below summarize the site's HVAC equipment. Refer to Attachment B to view the fully detailed existing HVAC system.
Packaged AC Unit — Gas Heating
Cooling..
Equipment
Tag
Area Served I
Equipment .-
Make
Capacitypaciii
Efficiency
AC-1
Gym
Split System AC
Fujitsu
18,000
12.5 n/a
n/a
AC-2
Dorms
Package Unit AC-
Day &
Unknown
Unknown
Unknown
Unknown
Gas Heating
Night
AC-3
Kitchen & Day Area
Package Unit AC-
Day &
Unknown
Unknown
Unknown
Unknown
Gas Heating
Night
AC-4
Main office & lobby
Package Unit AC-
Payne
30,000
Unknown
32,000
80%
Gas Heating
TRC Energy Services
10/03/2024
10 D1
August 8, 2018
Energy Audit Report I City of Vista Fire Stations
(AMNDAG
Fire Station 5
Fire Station 5 is conditioned by four packaged AC units equipped with gas heating and three split system AC units. The packaged AC units are controlled via the central Alerton EMS, while the split system units are controlled manually. The packaged units currently service their dependent zones with constant speed supply fan motors and no occupancy setback controls. The station receives hot water from one 100 gallon domestic hot water heater with an input capacity of 250,000 Btu/h.
The tables below summarize the site's HVAC equipment. Refer to Attachment B to view the fully detailed existing HVAC system.
Packaged AC Unit — Gas Heating
Cooling..HeatingEquipment
Tag
Area Served
- .-
Make
CapacityCapacity
Kitchen, Day Room,
Package Unit AC-
AC-1
York
48,000
12.2 60,000
81%
Crew Offices
Gas Heating
Women's
Package Unit AC-
AC-2
Restroom, Offices
Gas Heating
York
90,000
11.8 100,000
81%
Package Unit AC-
AC-3
Dorms
York
48,000
12.2 60,000
81%
Gas Heating
Dorms & Dorm
Package Unit AC-
AC-4
York
90,000
11.8 100,000
81%
Hallways
Gas Heating
AC-5
Unknown
Split System AC
York
48,000
11.2 n/a
n/a
AC-6
IT Room
Split System AC
Mitsubishi
24,000
9.1 n/a
n/a
AC-7
Gym
Split System AC
Mitsubishi
24,000
9.1 n/a
n/a
TRC Energy Services
10/03/2024
11 D1
August 8, 2018
Energy Audit Report I City of Vista Fire Stations
Q"NDAG
Fire Station 6
Fire Station 6 is conditioned by four packaged AC units equipped with gas heating and two split system AC units. The packaged AC units are controlled by the central Alerton EMS, while the split system units are controlled manually. The packaged units supply air at a constant speed and are not equipped with occupancy setback controls. Hot water is supplied to Fire Station 5 by one 100 gallon domestic hot water heater with an input capacity of 250,000 Btu/h.
The tables below summarize the site's HVAC equipment. Refer to Attachment B to view the fully detailed existing HVAC system.
Packaged AC Unit — Gas Heating
Equipment
Cooling..
Tag
Area Served
Equipment Type
Make
Capacity
Efficiencl
Capacity
Efficiency
Kitchen, Day Room,
Package Unit AC-
AC-1
York
48,000
12.2 60,000
80%
Crew Offices
Gas Heating
Women's
Package Unit AC-
AC-2
Restroom, Offices
Gas Heating
York
48,000
12.2 60,000
80%
Package Unit AC-
AC-3
Dorms
York
78,000
11.8 100,000
80%
Gas Heating
Dorms & Dorm
Package Unit AC-
AC-4
York
24,000
11.5 56,000
80%
Hallways
Gas Heating
AC-5
IT Room
Split System AC
Mitsubishi
24,000
9.1 n/a
n/a
AC-6
Gym
Split System AC
Mitsubishi
24,000
9.1 n/a
n/a
TRC Energy Services
10/03/2024
12 D1
August 8, 2018
Energy Audit Report I City of Vista Fire Stations (AMNDAG
3.2 Lighting Systems
All of the fire stations have basic lighting control systems in a portion of their spaces. These lighting control systems use occupancy sensors capable of turning off lights in vacant areas, but are not capable of dimming and are not integrated with the central EMS.
.4 r am r I -I I I -
IntelliRelay Lighting Control System
Fire Station 1's interior is lit primarily by 1'x4', 2'x4', and 2'x2' linear fluorescent recessed troffers and compact fluorescent recessed cans. Its exterior is illuminated by more compact fluorescent recessed cans along the building perimeter, and a variety of compact fluorescent and metal halide floods and wall packs illuminating the parking space. A small number of the interior troffers are controlled via basic occupancy sensors.
Fire Station 1 2'x4' Recessed Troffer
TRC Energy Services 13
10/03/2024 D 1
August 8, 2018
Energy Audit Report I City of Vista Fire Stations
Q"NDAG
Fire Station 2 is illuminated by 1'x4' linear fluorescent surface mounted troffers and compact fluorescent recessed square and can fixtures. Its exterior is lit by more compact fluorescent recessed square fixtures along the building perimeter, and high pressure sodium wall packs illuminating the parking space. A sizeable portion of the interior troffers are controlled via basic occupancy sensors.
Fire Station 2 Recessed Square CFL Fixture
Fire Station 3 contains mostly 1'x4' linear fluorescent surface mounted troffers and 2'x2' linear fluorescent recessed troffers. High pressure sodium wall packs illuminate its exterior. Most of the interior troffers are controlled via basic occupancy sensors.
ti
-rat-c -- -• `-^-y- _"".-_ -" ,_..- .- -- - V.� -
Fire Station 3 2'x2' Recessed Linear Fluorescent Troffer TRC Energy Services
10/03/2024
14 D1
August 8, 2018
Energy Audit Report I City of Vista Fire Stations
Q"NDAG
Fire Station 4 contains 1'x4' linear fluorescent surface fixtures and 2'x4' linear fluorescent recessed troffer.
The exterior of the station is lit mostly by incandescent and high pressure sodium wall -mounted fixtures.
Interior and exterior lighting fixtures are controlled manually.
Fire Station 4 1'x4' linear fluorescent surface mounted fixture Fire Station 5 is lit primarily by 0.5'x4' and 2'x2' linear fluorescent recessed troffers and compact fluorescent recessed cans. High pressure sodium and compact fluorescent wall packs illuminate the building's exterior spaces. The interior troffers and recessed cans are controlled via basic occupancy sensors.
Fire Station 5 Compact Fluorescent Recessed Can
TRC Energy Services
10/03/2024
15 D1
August 8, 2018
Energy Audit Report I City of Vista Fire Stations
(AMNDAG
Fire Station 6 is serviced by 2'x2' linear fluorescent recessed troffers, compact fluorescent recessed cans, and LED high bay fixtures. The exterior spaces of the station are lit by compact fluorescent and high pressure sodium flood lights and wall packs. Basic occupancy sensors control the interior troffers and recessed cans.
Fire Station 6 2'x2' Recessed Linear Fluorescent Troffer TRC Energy Services
10/03/2024
W.
D1
August 8, 2018
Energy Audit Report I City of Vista Fire Stations C"NDAG
3.1 Process Systems
Each fire station is backed up by a diesel generator currently equipped with a conventional thermosiphon pumps and heater. These backup generators guarantee the fire stations can carry out their duties even in the case of a power outage. These generators were inspected for prospective efficiency measures.
The water process systems serving the fire stations were assessed as well. Faucets and showerheads were inspected for their flowrate to identify potential energy saving measures.
Fire Station 1
Equipment
Diesel Generator
Make
Kohler
ModelSite
230REOZJO
230 kW
Fire Station 2
Diesel Generator
Kohler
60ROZJGI
54 kW
Fire Station 3
Diesel Generator
Kohler
20ROZJ81
25 kW
Fire Station 4
Diesel Generator
Kohler
Unknown
60 kW
Fire Station 5
Diesel Generator
Kohler
230REOZJO
230 kW
Fire Station 6
Diesel Generator
Kohler
230REOZJO
230 kW
Kohler Diesel Generator
TRC Energy Services
10/03/2024
17 D1
August 8, 2018
Energy Audit Report I City of Vista Fire Stations Q"NDAG
3.2 Lighting Energy Efficiency Measures (EEM)
Potential incentive estimates are based on current offerings and are subject to changes in incentive policies. Incentives on exterior LED expire 12/31/18.
EEM 1— Retrofit existing fluorescent troffers with LED equivalents FS-1
1 95
28,558 1
4.47 -106
1 $2,654
$1,279
$31,394
$30,115.31
11 EEM-1:
FS-4
50 5,398
1.89 -51
$1,179
$680
$16,661
$15,981.11
14 Upgrade
Fluorescent
FS-5
31 5,976
0.98 -54
$577
$349
$6,985
$6,635.74
11 Troffers to
FS-6
53 13,582
2.20 -92
$1,268
$520
$13,999
$13,479.74
11 LED
TOTAL
229
53,514
9.54 -302.55
$5,678
$2,827
$69,039
$66,212
11.7 The interiors of the fire stations are primarily lit by troffers equipped with linear fluorescent lamps. This measure covers the retrofitting of existing fluorescent troffers with LED troffers.
The proposed LED fixtures feature equivalent or greater lighting output than the existing fixtures, thus maintaining or improving lighting levels while reducing energy consumption by roughly 60%. Additionally, they offer truer color rendering values than conventional area lighting methods. LED lights also reduce maintenance costs associated with bulb and ballast replacement due to their significantly longer lifespans (100,000+ hours). LED fixtures create less waste heat, reducing the cooling load on their respective buildings. Finally, the proposed LED fixtures are capable of integrating with advanced controls systems that can adjust the fixtures' light outputs based on tenant requirements. All proposed LED fixtures are rated Premium in the Design Lights Consortium (DLC) Qualified Product Lists.
As the fixtures are planned to be tuned down via lighting controls, the energy savings shown for this measure do not reflect the full available savings. On -bill savings are based on the actual annual operating hours of the buildings. Refer to Attachment A for more details on the actual operating hours of the different areas of the facility. This measure is eligible for incentives under SDGE midstream incentive types — Interior LED 1x4, 2x2, and 2x4 Troffer.
Representative existing 2'x4' fluorescent troffer vs LED 2'x4' troffer TRC Energy Services 18 August 8, 2018
10/03/2024 D 1 Page 88 of 145
Energy Audit Report I City of Vista Fire Stations
(AMNDAG
EEM 2 — Upgrade 4' linear fluorescent lamps to LED
While most of the sites' 4' linear fluorescent lamps are contained within troffers eligible for full fixture replacement incentives, a portion are located within other fixture types. For these tubes, a lamp -for -lamp LED replacement is recommended.
Lamp for lamp upgrades are an incredibly economical option due to their low associated material and labor costs. As Fire Stations 2 and 3 are slated for demolition in the near future, full fixture replacements would not pay themselves off with energy savings before the end of their use. For this reason, lamp replacements were favored over fixtures replacements in Fire Stations 2 and 3, which are slated for demolition in the near future.
The proposed LED lamps offer equal or greater lighting output than the existing fluorescent lamps, capable of maintaining or improving lighting levels while reducing energy consumption by roughly 65%. The proposed lamps are compatible with Type A and B install types, meaning they can be easily plugged in and used or rewired for line voltage installation. Although LED lamps cannot dim like full LED fixtures, they are being primarily proposed in Fire Stations 2 and 3, which are not being equipped with advanced lighting controls capable of dimming. All proposed LED lamps are listed in the Design Lights Consortium (DLC) Qualified Product Lists and rated to 50,000+ hours.
On -bill savings are based on the actual annual operating hours of the buildings. Refer to Attachment A for more details on the actual operating hours of the different areas of the facility. This measure is eligible for incentives under SDGE midstream incentive type — Interior 4' LED T8 Lamp Representative existing 4' fluorescent tube vs 4' LED tube TRC Energy Services 19 August 8, 2018
10/03/2024 D 1 Page 89 of 145
Energy Audit Report I City of Vista Fire Stations
CSANDAG
EEM 3 — Replace existing HID exterior fixtures with LED exterior fixtures EEM-3: FS-1 1 1 591
0.13 0 $69
$35 $524
$488.64
7 Upgrade FS-4 3 927
0.23 0 $135
$95 $1,588
$1,492.97
11 Exterior
Fixtures to FS-6 2 1,186
0.27 0 $139
$70 $891
$821.22
6 LED TOTAL 6 2,704
0.63 0.00 $342
$200 $3,003
$2,803
8.2 The fire stations' exterior spaces are illuminated by fixtures containing high pressure sodium, incandescent, linear fluorescent, metal halide, and compact fluorescent lamps. This measure covers replacing incentive - eligible exterior fixtures with equivalent LED fixtures.
LED exterior fixtures offer a number of advantages over standard fixtures. In addition to requiring roughly 65% less energy, they also produce less glare and uplight than their HID counterparts, creating a more comfortable environment for nearby residents and reducing overall light pollution. The longer life span of LED fixtures (100,000+ hours) is especially advantageous at reducing maintenance costs for hard -to -reach elevated fixtures such as wall packs and flood fixtures. The truer color offered by the LED fixtures also increases nighttime visibility, improving nearby safety and security. All proposed LED fixtures are rated Premium in the Design Lights Consortium (DLC) Qualified Product Lists.
On -bill savings are based on the actual annual operating hours of the buildings. Refer to Attachment A for more details on the actual operating hours of the different areas of the facility. This measure is eligible for incentives under SDGE midstream incentive types — LED Wall -Mounted Area Lighting.
F.
73 Representative existing HID wall pack vs LED wall pack TRC Energy Services 20 August 8, 2018
10/03/2024 D 1 Page 90 of 145
Energy Audit Report I City of Vista Fire Stations
(AMNDAG
EEM 4— Unincentivized LED Upgrades
,
q-111
lectricity
Savings
Iecl
tric
D. and
Natural
Gas
Annual
Total
Potential
Incentive
Project
Implementation
Net
Implementation
Net Simpll
Payback
Solution Code
FS-1
196
34,070
R ducti.
5.73 Savings
-74
Savings
,
$3,214
$0
cost
$30,295
Cost
$30,295.29
Period
9 FS-2
41 8,358
1.72 -6
$866
$0
$4,624
$4,623.72
5 EEM-4:
FS-3
77 15,181
2.73 -54
$1,406
$0
$8,450
$8,450.38
6 Unincentivize
FS-4
80 19,999
3.52 -16
$2,188
$0
$29,523
$29,522.96
14 d LED
Upgrades
FS-5
180
34,651
6.46 -76
$3,453
$0
$26,584
$26,584.27
8 FS-6
121
18,918
3.39 -43
$1,794
$0
$12,885
$12,885.39
7 TOTAL
695
131,177
23.55 -269.18
$12,922
$0
$112,362
$112,362
8.7 Miscellaneous lighting around the six stations is provided by inefficient lamps and fixtures that do not fit into existing SDGE incentive groups. Examples include decorative fixtures, recessed cans, mid -range wall packs, strip fixtures, and linear fluorescent tubes of lengths other than 4 feet.
Although this measure is not incentivized, it was still proposed due to the high potential energy savings and lighting quality improvements offered by LED lamps and fixtures. LED lights reduce energy consumption by 60-70% compared to their standard -efficiency counterparts, reduce maintenance costs by offering much longer lifespans of 50,000+ hours, and reduce the cooling loads in buildings by creating less waste heat.
Proposed LED lamps and fixtures are rated in the Design Lights Consortium (DLC) or Energy Star (ES) Qualified Product Lists.
On -bill savings are based on the actual annual operating hours of the buildings. Refer to Attachment A for more details on the actual operating hours of the different areas of the facility. This measure not eligible for incentives.
Representative unincentivized standard fixtures and their LED equivalents TRC Energy Services
10/03/2024
21 D1
August 8, 2018
Energy Audit Report I City of Vista Fire Stations
(AMNDAG
EEM 5 — Implement Advanced Lighting Controls
FS-1
13,190
0.63 0
$678
$0
$17,322
$17,322.44
26 FS-4
6,500
0.74 0
$510
$0
$7,066
$7,065.57
14 EEM 5: Lighting
Controls
FS-5
8,667
0.45 0
$440
$0
$10,275
$10,274.91
23 FS-6
7,438
0.28 0
$307
$0
$7,444
$7,443.89
24 TOTAL
35,795
2.10 0.00
$1,935
$0
$42,107
$42,107
21.8 Conventional lighting systems are manually controlled on/off by users, which leaves a significant margin for wasted energy. Users will leave lights on in unoccupied rooms, lighting fixtures will over -light spaces, and the system cannot dynamically react to sunlight entering its space.
This measure proposes lighting controls systems in Fire Stations 1 and 4-6. Fire Stations 2 and 3 are excluded as they will be demolished before the benefits of this measure can be fully realized. The Lutron lighting controls package proposed in this audit will include high -precision occupancy sensors that will turn off their dependent lighting fixtures when they sense that their space is unoccupied. The system will control dependent lighting fixtures, allowing the fixtures' power to be tuned down to prevent over -lighting.
Additionally, the proposed Lutron controls system is BACNet compatible and can communicate with the EMS to control HVAC systems. Finally, photosensors will measure light entering through windows and can dynamically adjust light fixture levels to save energy and maintain light levels throughout the facility.
The paybacks for this measure are high but they do not reflect total amount of savings made possible by this measure. The occupancy setback controls solution presented in the Mechanical Efficiency Measure section is also facilitated by the lighting controls presented.
On -bill savings are based on the actual annual operating hours of the buildings. Refer to Attachment A for more details on the actual operating hours of the different areas of the facility, as well as a detailed schedule of existing and proposed equipment. Equipment was selected to comply with and exceed Title 24 2016 requirements.
Lutron Vive ceiling occupancy sensor and wireless hub
TRC Energy Services 22 August 8, 2018
10/03/2024 D 1 Page 92 of 145
Energy Audit Report I City of Vista Fire Stations
QSANDAG
3.3 Mechanical Energy Efficiency Measures (EEM)
EEM 6 — HVAC system maintenance
Solution Code
Site
FS-1
,c,t
Savi ngs
3,567
n-
E
-d
Re I u ction
7.74 89
Annual
Total Potential
Incentive
Savings
$668 $0
Project
Implementation
Cost
$2,406
Net
Implementation
Cost
$2,406
Net Simple
Payback
Period
4 FS-2
298
0.64 4
$53
$0
$235
$235
4 EEM 6: HVAC
FS-3
1,110
2.41 28
$208
$0
$749
$749
4 System
FS-4
1,415
3.02 19
$252
$0
$1,117
$1,117
4 Maintenance
FS-5
2,419
5.23 53
$448
$0
$1,700
$1,700
4 FS-6
2,457
5.25 32
$439
$0
$1,941
$1,941
4 TOTAL
11,264
24.29 1 224.22
$2,067
1 $0
$8,148
$8,148
3.9 Advanced maintenance strategies can enable an AC unit to operate at or near its optimal efficiency. This measure accounts for the quality maintenance to be done to all the existing package units, a total of 16 units, in order to increase their performance. This measure follows the recommendations of the highest available industry standard —Standard 180— and ensures the units maintains that level of performance for the life of a multi -year Maintenance Agreement.
Refer to Attachment B — Mechanical Calculations for more detailed information on the existing HVAC equipment of each building, as well as calculation methodology.
The EEM accounts for the following submeasures:
Refrigerant Charge Adjustment
This sub measure involves refrigerant charge correction to nonresidential direct expansion (DX) air-cooled HVAC units. When an HVAC unit's refrigerant charge does not meet the manufacturer recommended levels it results in a decrease in the unit's energy efficiency ratio (EER). Some units may be undercharged, which can result in decreased power draw but potentially longer run times. Other units may be overcharged, which can result in increased power draw but potentially shorter run times. In either case, energy savings can be achieved by correcting refrigerant charge to optimum levels based on the manufacturers' specifications.
The energy savings and costs of the EEM were determined based on PGE work paper PGE3PHVC160 (Refrigerant Charge Adjustment (RCA)).
Air flow Adjustment
When a building has balanced air flow, it means every room receives the right amount of air in order to ensure that it remains at an ideal temperature throughout the year. Along with keeping members of the building comfortable, correctly balanced airflow has the dual bonus of improving energy efficiency and reducing utility spending. This can be done by many ways, such as adjusting the system dampers or the small levers located on the round branch ducts.
The energy savings and costs of the EEM were determined based on Southern California Edison (SCE) work paper SCE17HCO29 (Residential HVAC Quality Maintenance).
TRC Energy Services 23 August 8, 2018
10/03/2024 D 1 Page 93 of 145
Energy Audit Report I City of Vista Fire Stations (AMNDAG Evaporator & Condenser Coil Cleaning
Dirty or fouled evaporators and condensers restrict air flow, reduce heat transfer efficiency and compressor efficiency, and can increase compressor run time. Coil cleaning eliminates air blockages between fins and can remove dust, grime, and other contaminants from the fin and tube heat transfer surfaces thus improving heat transfer efficiency, decreasing compressor run time, and increasing efficiency The energy savings and costs of the EEM were determined based on PGE work papers PGE3PHVC158 (Evaporator Coil Cleaning) & PGE3PHVC156 (Condenser Coil Cleaning).
Worker performing condenser coil maintenance
TRC Energy Services
10/03/2024
24 D1
August 8, 2018
Energy Audit Report I City of Vista Fire Stations
Q"NDAG
EEM 7 — New Evaporator Fan Motors with Variable Air Volume Control Solution
-41EIS
Site
'"c'ty
vngs
Electric
mand
DeCode
Reduction
Natural
Gas
Savings
Annual
Total
Savings
Potential
Incentive
Project
Implementation
Cost
Net
Implementation
Cost
Net
Simple
Payback
Period
7:
FS-1
2 20,728 6.85 2 $3,494 $3,109 $10,029 $6,919
2 New
Variable
FS-4
3 8,752
2.89 1
$1,475
$1,313
$27,413
$26,100
18 Air Volume
FS-5
4 21,189
7.00 2
$3,572
$3,178
$20,057
$16,879
5 Evaporator
Fan
FS-6
4 15,201
5.02 1
$2,562
$2,280
$20,057
$17,777
7 Motors
TOTAL
13 65,870
21.76 1 6.22
1 $11,103 1
$9,881
$77,556
$67,675
6.1 The AC units currently serving the fire stations supply air to their dependent zones at a constant rate, varying the temperature of the supply air to meet conditioning needs. This measure recommends replacing the existing evaporator fan motors with high efficiency variable speed smart motors, which can be controlled to vary flowrate to condition spaces.
A number of the fire stations' package unit are older than 10 years, but are still in good operating condition and do not warrant a complete replacement of the unit. The units currently use shaded pole motors, and the first stage of this measure proposes installing new and more efficient electronically commutated (EC) motors. In addition to being roughly 20% more efficient than standard motors, the EC motors will realize increased savings through enabling more efficient controls.
Variable Air Volume systems are more capable of integrating with temperature control systems, reducing energy consumed by the compressors, and consuming less energy through their system fans. This measure will integrate with the building control system, so the AC units can receive information from the EMS regarding zone occupancy and temperature requirements and respond accordingly. By doing so, the HVAC system will reduce energy wasted when over -conditioning spaces.
This measure applies to sites that are currently or will be managed by an EMS. These sites are Fire Stations 1 and 4, 5, and 6. Note that Fire Station 4 is currently not integrated into an EMS. The Fire Station 4 costs in the measure include the integration of its HVAC systems to the central Alerton EMS.
The savings of these EEM were developed through the use of the representative building eQuest model developed (See Attachment D). The EEM applies to 15 package units, described in the table below. This measure is eligible for incentives under the SDGE targeted solutions "Constant Air Volume to Variable Air Volume Conversions".
Site Name
Fire Station 1
Equipment Type
Package Unit AC- Gas Heating
Qty
1 Make
York
Model Number
ZJ060S08N2AZZ10002C
Tonnage
5.0 Fire Station 1
Package Unit AC- Gas Heating
1 York
ZJS21OS24P2AZZ10004B
17.5 Fire Station 4
Package Unit AC- Gas Heating
2 Day & Night
Unknown
3.5 Fire Station 4
Package Unit AC- Gas Heating
1 Payne
PY3GNAA30040NA
2.5 Fire Station 5
Package Unit AC- Gas Heating
1 York
ZJ048To6N2BAAIC
4.0 Fire Station 5
Package Unit AC- Gas Heating
1 York
ZH090S1ON2BAA4B
7.5 Fire Station 5
Package Unit AC- Gas Heating
1 York
ZJ048T06N2BAAIC
4.0 Fire Station 5
Package Unit AC- Gas Heating
1 York
ZH090S1ON2BAA4B
7.5 Fire Station 6
Package Unit AC- Gas Heating
2 York
ZJ048T06N2BAA1C
4.0 Fire Station 6
Package Unit AC- Gas Heating
1 York
ZH078S1ON2BAA4B
6.5 Fire Station 6
Package Unit AC- Gas Heating
1 York
D2NX024D05606NXA
2.0 TRC Energy Services 25 August 8, 2018
10/03/2024 D 1 Page 95 of 145
Energy Audit Report I City of Vista Fire Stations
(AMNDAG
EEM 8 — Implement Occupancy Setback Controls
Each fire station is conditioned by several packaged AC units with several associated thermal zones. The zones are maintained at their occupied cooling and heating setpoints irrespective of their occupancy levels.
This measure recommends implementing zone setback controls based on the occupancy.
As a part of this control strategy, the Lutron advanced lighting controls system will provide occupancy inputs to the control system. If no occupancy is detected for a predetermined amount of time, the control system will increase the temperature deadband in unoccupied zones and force the associated HVAC supply fans to their minimum flow set point. The proposed occupied setback temperature set points will be programmed such that the zone can be brought back to occupied mode temperatures to prevent any discomfort to occupants. Savings are realized by reduction in cooling and heating energy when zones are unoccupied.
This measure is very cost effective as most of the equipment costs involved are already borne by the lighting controls measure. The costs for this measure include connecting the proposed lighting control system to the EMS to send occupancy data, in addition to programming of the actual setback controls.
This measure applies to Fire Stations 1 and 4, 5, and 6. Fire Stations 2 and 3 are excluded as they are not being proposed advanced Lutron controls due to their planned demolition.
The savings of these EEM were developed through the use of the representative building eQuest model developed (See Attachment D). This measure is eligible for incentives under the SDG&E targeted solution "HVAC — Controls/Controlling Equipment".
Lutron smart switch with integrated occupancy sensor
TRC Energy Services 26 August 8, 2018
10/03/2024 D 1 Page 96 of 145
Energy Audit Report I City of Vista Fire Stations
Q"NDAG
3.1 Process Energy Efficiency Measures (EEM)
EEM 9 — Faucet aerators and low -flow showerheads
TRC recommends replacing any standard flow faucets with faucet aerators. The Environmental Protection Agency (EPA) has a special classification for more efficient faucets known as Water Sense. Water Sense labeled bathroom sink faucets and accessories that use a maximum of 1.5 gallons per minute can reduce a sink's water flow by 30% or more from the standard flow of 2.2 gallons per minute without sacrificing performance.
In addition to saving water, there is also an energy savings associated with faucet aerators, as less water is required to be heated. Savings for this measure are per faucet, and based on SCE work paper SCE17WP004, which assumes a baseline case of 2.2 GPM, and a proposed case of 1.7 GPM. Faucet aerators and low flow showerheads have both low material and installation costs, making them especially appealing. Savings calculated for this measure are not all encompassing as they do not include the potential utility savings realized by reduced water consumption.
The table below details the standard -flow faucets and showerheads within the stations that are considered for this measure. Fire Stations 2 and 3 were excluded because they are planned to be demolished before this measure can pay for itself in savings.
Site
Fire Station 1
Equipment
Normal Showerhead
Quantity
6 Fire Station 4
Normal Faucet
3 Fire Station 4
Normal Showerhead
3 Fire Station 5
Normal Faucet
6 Fire Station 5
Normal Showerhead
4 Fire Station 6
Normal Faucet
6 Fire Station 6
Normal Showerhead
4 This measure is eligible for partial rebates under the SDG&E targeted solution "Low Flow Showerhead".
TRC Energy Services 27 August 8, 2018
10/03/2024 D 1 Page 97 of 145
Energy Audit Report I City of Vista Fire Stations
QSANDAG
EEM 10 — Upgrade diesel generators with circulating block heaters Solution Code Site
FS-1
City
1 Savings
2,559
DemandMMIJElectric,ty Electric
Reduction
0.43 Natural
avings
0.00 Annual
Savings
$431
Potentlailpl
Incent v
$0
Project
Cost
$1,117
Ne'__W__4e�
Cos t
$1,117
e
Period
3 FS-2
1 3,520
0.59 0.00
$593
$0
$1,008
$1,008
2 EEM 10: FS-3
1 3,520
0.59 0.00
$593
$0
$1,008
$1,008
2 Circulating FS-4
1 3,520
0.59 0.00
$593
$0
$1,008
$1,008
2 Block Heaters
FS-5
1 2,559
0.43 0.00
$431
$0
$1,117
$1,117
3 FS-6
1 2,559
0.43 0.00
$431
$0
$1,117
$1,117
3 TOTAL 1
6 18,236
1 3.06
1 0.00 1
$3,073 1
$0
1 $6,375
1 $6,375
2.1 The fire stations are currently backed up by diesel generators equipped with conventional thermosiphon pumps and heaters. This measure recommends replacing the existing pumps with a recirculation pump and a smaller electric resistance heater. Due to the excellent payback, this measure applies to all of the fire stations.
Conventional thermosiphon heaters rely on the change in density in order to circulate heated coolant. This type of circulation leads to non -uniform temperature distribution, where the coolant is warmer at the top of the block and colder at the bottom, which requires the electric resistance heater to operate for a longer duration. This also means that there is waste heat in sections of the block, as the heater must operate to maintain a certain temperature, so the top of the block will always be hotter than necessary. Replacing thermosiphon heaters with electrical pump heaters can provide energy savings. By pumping the heated coolant, a more uniform temperature is obtained throughout the engine block. As a result of using a recirculation pump, a smaller electric resistance heater can be used to heat the coolant as there will be a more uniform temperature achieved through the mixing of fluid throughout the engine block.
Savings for this measure are based off SCE workpaper SCE17HC055. Refer to Attachment B for more details on the savings calculations performed for this measure. The existing equipment is used as baseline and no ISP is applicable.
Circulating block heater on a diesel generator
TRC Energy Services 28 August 8, 2018
10/03/2024 D 1 Page 98 of 145
Energy Audit Report I City of Vista Fire Stations
CSANDAG
Attachments
Attachment A — Lighting Calculations Vista Fire Stations Attachment B — Mechanical Calculations Vista Fire Stations Attachment C — Specifications
Attachment D — eQuest Package Vista Fire Stations
TRC Energy Services
10/03/2024
29 D1
August 8, 2018
T R
Results you can rely on
Prepared by
Sergio Corona
Lake Casco, PE
TRC Energy Services
9685 Research Drive
Irvine, CA 92618
�SANDAG
City of Vista Jim Porter Recreation Center
1200 Vale Terrace Dr, Vista, CA 92084
Comprehensive Energy Audit Report
October 5, 2018
10/03/2024
D1
Energy Audit Report I City of Vista Jim Porter Recreation Center Table of Contents
0�"vaG
1. Purpose of the Audit............................................................................................................
2. Facility Description...............................................................................................................
3. Energy Savings and Cost Summary....................................................................................
3.1 Mechanical Systems..........................................................................................................
3.2 Lighting Systems...............................................................................................................
3.3 Lighting Energy Efficiency Measures (EEM).....................................................................
EEM 1 — Retrofit existing fluorescent troffers with LED equivalents ...........................
EEM 2 — Upgrade Surface Mount and High Bay 4' linear fluorescent fixtures to LED EEM 3 — Replace existing HID exterior fixtures with LED exterior fixtures .................
EEM 4 — Unincentivized LED Upgrades...........................................................................
EEM 5 — Replace existing HID Ball Field Fixtures..........................................................
Refrigerant Charge Adjustment...........................................................................................
Airflow Adjustment..............................................................................................................
Evaporator & Condenser Coil Cleaning...............................................................................
EEM 7 — New HVAC Smart Motors...................................................................................
EEM 8 — Implement Occupancy Setback Controls.........................................................
Attachments................................................................................................................................ .2
.3
.3
.4
.6
.7
.7
.8
.9
.9
10 11
11 11
12 13
14 TRC Energy Services
10/03/2024
1 D1
September 28, 2018
Energy Audit Report I City of Vista Jim Porter Recreation Center (AMNDAG
1. Purpose of the Audit
TRC Energy Services has completed audits for Lighting, Mechanical, and Controls measures for the Jim Porter Recreation Center located, within the City of Vista, and identified energy efficiency opportunities that have the potential to reduce total utility costs by $21,667 annually, while also improving building comfort and safety, and reducing maintenance workload. This report details the audit findings and their opportunities.
The City may be able to implement some of the recommended measures without detailed engineering.
Other measures will require more detailed engineering analysis of feasibility and constructability. This study does not include specific design instructions and is not intended as a design document. Projects have not been developed to design level. The design professional or other persons following the recommendations shall accept responsibility and liability for the results.
As technical consultants TRC Energy Services remains product and vendor neutral. The products presented in this report represent examples of the possible products that could be used for the project. The products were chosen based on their technological feasibility, efficiency and impact on the project economics. The analysis herein is based on the performance and pricing of these particular products. It should be noted that if the City would like to move forward with products other than those shown in this report, the analysis would need to be revised based on updated product performance and costs.
Acknowledgments
Special thanks to Keith Gardner of the City of Vista, Anna Lowe of the San Diego Association of Governments (SANDAG), as well as Adrian Salas and Chris Nanson of San Diego Gas & Electric (SDGE) for all their help and cooperation throughout the audit and reporting process.
TRC Energy Services 2 September 28, 2018
10/03/2024 D 1 Page 102 of 145
Energy Audit Report I City of Vista Jim Porter Recreation Center QS�QNDAG
2. Facility Description
The scope of this audit report covers the Jim Porter Recreation Center, discussed below.
Site Address SA Number Annual kWh
Jim Porter Recreation Center 1200 Vale Terrace Dr., Vista, CA 92084 7727388997 114,154* Ball Field Lighting 1200 Vale Terrace Dr., Vista, CA 92084 9918213518 99,926 *Billing Data was not readily available for this service account. Annual kWh was estimated based on available data from a previous roadmap billing data.
The Recreation Center is a 16,500 sqft building that hosts events, and afterschool and summer vacation activities. The building consists of a high bay gymnasium, an auditorium, classrooms, offices, and a kitchen area. Typical hours of operation for the office areas are Monday through Friday, 7am to 5pm. Events are hosted on Friday and weekend
afternoons, typically from April to December. The
Recreation Center and surrounding sports fields are served by two separate electric meters. There is no natural gas usage at this facility. The surrounding sports fields include basketball and tennis courts, as well as two softball fields. -ws770,�*.
OLWo The spaces are conditioned by three packaged heat pumps �' hlditrr�r�r and three packaged AC units. The building's interior is lit by linear fluorescent T8 fixtures, recessed CFL fixtures, and new LED recessed Troffers. The exterior of the building is illuminated by high pressure sodium, and LED wall pack fixtures. The surrounding ball fields are lit by metal halide flood lights.
3. Energy Savings and Cost Summary
Based on the site audits, TRC identified various energy efficiency measures. Measures were subdivided into the following categories:
1. Lighting
All measures involving the interior and exterior illumination of the building
2. Mechanical Systems
All measures involving the building's HVAC systems.
TRC did not consider onsite generation technologies such as renewable energy as a part of this study.
Also, the audited sites are not enrolled in any SDGE demand generation (DG), demand response (DR), or permanent load shifting (PLS) programs.
Table 3.1 below lists all the measures identified with project implementation economics. The tables estimated the annual utility savings based on a blended utility rate. Please find additional details on each measure in the Energy Efficiency Measure Description section below.
TRC Energy Services 3 September 28, 2018
10/03/2024 D 1 Page 103 of 145
Energy Audit Report I City of Vista Jim Porter Recreation Center "DA 4,350
1.69 $954
$900
$10,570
$9,670
10.1 EEM-1: Upgrade Fluorescent
45 Troffers to LED
EEM-2: Install New LED Bay
17 5,020
1.97 $1,082
$580
$10,954
$10,374
9.6 Fixtures
EEM-3: Install New LED Exterior
12 6,544
1.60 $912
$0
$7,747
$7,747
8.5 Wall Packs
EEM-4: Replace CFL Recessed
Can Lighting with new LED
4 224
0.10 $54
$0
$404
$404
7.4 Recessed Fixtures
EEM-5: Install New LED Field
76 62,920
51.68 $17,418
$0
$181,045
$181,045
10.4 Lighting
EEM 6: HVAC System
6 6,514
6.92 $1,713
$0
$4,924
$4,924
2.9 Maintenance
EEM 7: New Variable Air
5 4,180
2.00 $1,100
$627
$5,303
$4,676
4.3 Volume Evaporator Fan Motors
EEM 8: Occupancy Setback
5 10,191
-3.00
$2,681
$815
$9,263
$8,448
3.2 Totals
99,942
62.96 $25,913
$2,922
$230,211
$227,288
8.8 3.1 Mechanical Systems
The Jim Porter Rec Center's HVAC system is divided into five zones: Offices and Lobby area, Auditorium, Dance Studio, Classrooms, and Gymnasium. The HVAC units servings the Offices and Lobby, Classrooms, and Auditorium are controlled by hermostats and are programmed to operate during normal business hours at a setpoint of 72°F. During hosted events, the setpoint in the Auditorium is lowered to 70OF for the duration of the event. The HVAC unit in the Dance studio is manually turned on and off when the space is occupied.
The gymnasium is not conditioned, but is ventilated by four 1.5 HP exhaust fans, which are manually turned on and off when the space is occupied for basketball and volleyball games.
The Recreation Center is conditioned by three packaged Carrier heat pumps, and three Trane Packaged AC units. These units are about 14 years old on average but are currently in good condition and do not warrant a full replacement at this time. All the HVAC units at the site are equipped with economizers, and currently service their dependent zones with constant speed supply fan motors and no occupancy setback controls. Domestic Hot water is supplied by an electric 50 gallon Rheem Fury domestic hot water heater, with an input capacity of 4500W.
The tables below summarize the site's HVAC equipment. Refer to Attachment B to view the fully detailed existing HVAC system.
TRC Energy Services 4 September 28, 2018
10/03/2024 D 1 Page 104 of 145
Energy Audit Report I City of Vista Jim Porter Recreation Center DAG
Packaged Heat Pump Unit
Area Served
Equipment Type
Make
Yearof
CoolingEquipment
CapacityTag
..
Mfg.
..
•P
Package Unit Heat
HP-1
Office & Lobby
Carrier
2006
42,000
7.67 40.5
2.66 Pump
Package Unit Heat
HP-2
Auditorium
Carrier
2001
115,000
7.84 110.0
2.95 Pump
Package Unit Heat
HP-3
Auditorium
Carrier
2007
115,000
8.95 110.0
2.90 Pump
Package Unit AC-
AC-4
Dance Studio
Trane
2005
108,000
8.78 n/a
n/a
No Heating
Package Unit AC
AC-5
Office &Lobby
Trane
2002
35,000
8.60 n/a
n/a
No Heating
Package Unit AC-
AC-6
Classrooms
Trane
2002
88,000
8.60 n/a
n/a
No Heating
EF-1
Gymnasium
1.5 HP Exhaust Fan
Unknown
Unknown
n/a
n/a
n/a
n/a
EF-2
Gymnasium
1.5 HP Exhaust Fan
Unknown
Unknown
n/a
n/a
n/a
n/a
EF-3
Gymnasium
1.5 HP Exhaust Fan
Unknown
Unknown
n/a
n/a
n/a
n/a
EF-4
Gymnasium
1.5 HP Exhaust Fan
Unknown
Unknown
n/a
n/a
n/a
n/a
TRC Energy Services 5 September 28, 2018
10/03/2024 D 1 Page 105 of 145
Energy Audit Report I City of Vista Jim Porter Recreation Center Q"NDAG
3.2 Lighting Systems
The Recreation Center has basic lighting control systems in a portion of their spaces. These lighting control systems use occupancy sensors capable of turning off lights in vacant areas but are not capable of dimming.
The building's interior is lit primarily by 1'x4' and 2'x4' linear fluorescent and LED recessed troffers, and compact fluorescent recessed cans. Its exterior is illuminated by and LED wall packs, and High Pressure Sodium wall packs along the building perimeter. The gym is illuminated by 2'x4' Linear Fluorescent high bay fixtures. A small number of the interior troffers are controlled via integrated occupancy sensors.
Gymnasium 2'x4' High Bay fixture
The adjacent ball fields are lit by 1000W Metal Halide flood lights that are controlled by a Musco control system. These lights are set to turn on at dusk and shut off at 10:30pm. The ball field lights are served by a separate meter and are billed based on a ASTODPSW billing rate. /* , 3
Field Lighting Musco Control Panel
TRC Energy Services 6 September 28, 2018
10/03/2024 D 1 Page 106 of 145
Energy Audit Report I City of Vista Jim Porter Recreation Center
3.3 Lighting Energy Efficiency Measures (EEM)
EEM 1— Retrofit existing fluorescent troffers with LED equivalents The interior of the recreation center is primarily lit by troffers equipped with linear fluorescent lamps. This measure covers the retrofitting of existing 2x4 fluorescent troffers with LED retrofit kits, and the existing 1 x4 fluorescent troffers with LED troffers.
The proposed LED fixtures feature equivalent or greater lighting output than the existing fixtures, thus maintaining or improving lighting levels while reducing energy consumption 45%. Additionally, they offer truer color rendering values than conventional area lighting methods. LED lights also reduce maintenance costs associated with bulb and ballast replacement due to their significantly longer lifespans (100,000+ hours). LED fixtures create less waste heat, reducing the cooling load on their respective buildings. All proposed LED fixtures are rated Premium in the Design Lights Consortium (DLC) Qualified Product Lists.
Conventional lighting systems are manually controlled on/off by users, which leaves a significant margin for wasted energy. Users will leave lights on in unoccupied rooms, and lighting fixtures will over -light spaces.
In order to meet Title 24 standards, a wireless lighting controls package proposed in this audit will include high -precision occupancy sensors that will turn off their dependent lighting fixtures when they sense that their space is unoccupied.
On -bill savings are based on the actual annual operating hours of the buildings. Refer to Attachment A for more details on the actual operating hours of the different areas of the facility. This measure is eligible for incentives under SDGE midstream incentive types — Interior LED 1x4 Troffers and Interior LED 2x4 Troffer Retrofit Kits.
s
Representative existing 2'x4' fluorescent troffer vs LED 2'x4' troffer TRC Energy Services 7 September 28, 2018
10/03/2024 D 1 Page 107 of 145
Energy Audit Report I City of Vista Jim Porter Recreation Center Lutron Vive ceiling occupancy sensor and wireless hub
EEM 2 — Upgrade Surface Mount and High Bay 4' linear fluorescent fixtures to LED The gym is lit primarily by 2'x4' 6 lamp linear fluorescent high bay fixtures. Another 1'x4' linear fluorescent fixture is found in a storage area. The lights are currently controlled by an on/off switch. This measure covers the retrofitting of existing fluorescent high bay and surface mount fixtures with LED fixtures. All proposed LED fixtures are rated Premium in the Design Lights Consortium (DLC) Qualified Product Lists.
The gym High Bay fixtures include integrated occupancy sensors to further increase savings and to meet Title 24 compliance standards. These sensors are designed for High Bay Applications and have the ability to dim or shut off after a predetermined amount of time without activity.
On -bill savings are based on the provided usage schedule for the gym. The gym is used primarily on the weekends for basketball and volleyball games and sees the most usage from November to April. Refer to Attachment A for more details on the actual operating hours of the different areas of the facility. This measure is eligible for incentives under SDGE midstream incentive type — Low/High Bay Fixture.
Representative existing 2'x4' fluorescent bay fixture vs 4' LED bay fixture TRC Energy Services 8 September 28, 2018
10/03/2024 D 1 Page 108 of 145
Energy Audit Report I City of Vista Jim Porter Recreation Center Ql"NDAG EEM 3 — Replace existing HID exterior fixtures with LED exterior fixtures The exterior spaces are illuminated by fixtures containing high pressure sodium lamps and LEDs. This measure covers replacing incentive -eligible exterior wall pack fixtures with equivalent LED fixtures.
LED exterior fixtures offer a number of advantages over standard fixtures. In addition to requiring roughly 65% less energy, they also produce less glare and uplight than their HID counterparts, creating a more comfortable environment for nearby residents and reducing overall light pollution. The longer life span of LED fixtures (100,000+ hours) is especially advantageous at reducing maintenance costs for hard -to -reach elevated fixtures such as wall packs and flood fixtures. The truer color offered by the LED fixtures also increases nighttime visibility, improving nearby safety and security. All proposed LED fixtures are rated Premium in the Design Lights Consortium (DLC) Qualified Product Lists. California Title 24 requires exterior luminaires under 24 feet to be controlled by a motion sensor to automatically reduce lighting power 40-90 percent during vacant periods. The proposed lighting fixtures are equipped to with integrated motion sensors in order to meet this requirement and to further increase savings.
On -bill savings are based on a dusk to dawn schedule. Refer to Attachment A for more details on the actual operating hours of the different areas of the facility. This measure is eligible for incentives under SDGE midstream incentive types — LED Wall -Mounted Area Lighting.
Representative existing HID wall pack vs LED wall pack
EEM 4— Unincentivized LED Upgrades
Miscellaneous lighting around recreation center is provided by inefficient recessed fixtures that do not fit into existing SDGE incentive groups. Although this measure is not incentivized, it was still proposed due to the high potential energy savings and lighting quality improvements offered by LED fixtures. The proposed TRC Energy Services 9 September 28, 2018
10/03/2024 D 1 Page 109 of 145
Energy Audit Report I City of Vista Jim Porter Recreation Center Q"NDAG
LED lights reduce energy consumption by 63% compared to their standard -efficiency counterparts, reduce maintenance costs by offering much longer lifespans of 50,000+ hours, and reduce the cooling loads in buildings by creating less waste heat. Proposed LED fixtures are rated in the Energy Star (ES) Qualified Product Lists.
On -bill savings are based on the actual annual operating hours of the buildings. Refer to Attachment A for more details on the actual operating hours of the different areas of the facility. This measure not eligible for incentives.
Representative unincentivized standard fixtures and their LED equivalents EEM 5 — Replace existing HID Ball Field Fixtures
The sports fields adjacent to the recreation center are illuminated by inefficient 1000-watt metal halide flood lights. These lights are controlled by a Musco Controls System and operate from dusk to 10:30pm.
While SDG&E does not incentivize Architectural Flood and Spot Luminaires, this measure was still proposed due to the high potential energy savings and lighting quality improvements offered by LED fixtures. Implementing this measure could reduce energy consumption by about 60% compared to the Metal Halide flood lights currently in use and reduce maintenance costs by offering much longer lifespans of 100,000+ hours. In the case of field lighting, a typical one -for -one replacement is not always recommended or required. It is suggested that the City of Vista request a lighting design from the lighting vendor prior to the installation of the new fixtures. This could further reduce the quantity of fixtures, while improving implementation cost and energy savings. On -bill savings are based on the described field operating hours of 1,218 hours per year. Refer to Attachment A for more details on the actual operating hours of the different areas of the facility.
Representative Field Flood standard fixtures and their LED equivalents TRC Energy Services 10 September 28, 2018
10/03/2024 D 1 Page 110 of 145
Energy Audit Report I City of Vista Jim Porter Recreation Center AG EEM 6 — HVAC system maintenance
Solution Code Unit
HP-1
On -Bill
Electricity
Savings
505
Electric
Demand
Reduction
0.55 Annual Total
Savings
$133
Potential
Incentive
$0
Project
Implementation
Cost
$374
Net
Implementation
Cost
$374
Net Simple
Payback Period
2.8 HP-2
1,444
1.57 $380
$0
$1,069
$1,069
2.8 EEM 6: HVAC System HP-3
1,444
1.57 $380
$0
$1,069
$1,069
2.8 Maintenance AC-4
1,522
1.57 $400
$0
$1,176
$1,176
2.9 AC-5
457
0.47 $120
$0
$353
$353
2.9 AC-6
1,142
1.18 $300
$0
$882
$882
2.9 TOTAL
6,514
6.92 $1,713
$0
$4,924
$4,924
2.9 Advanced maintenance strategies can enable an AC unit to operate at or near its optimal efficiency. This measure accounts for the quality maintenance to be done to all the existing package units, a total of 16 units, in order to increase their performance. This measure follows the recommendations of the highest available industry standard —Standard 180— and ensures the units maintains that level of performance for the life of a multi -year Maintenance Agreement.
Refer to Attachment B — Mechanical Calculations for more detailed information on the existing HVAC equipment of each building, as well as calculation methodology.
The EEM accounts for the following submeasures:
Refrigerant Charge Adjustment
This sub measure involves refrigerant charge correction to nonresidential direct expansion (DX) air-cooled HVAC units. When an HVAC unit's refrigerant charge does not meet the manufacturer recommended levels it results in a decrease in the unit's energy efficiency ratio (EER). Some units may be undercharged, which can result in decreased power draw but potentially longer run times. Other units may be overcharged, which can result in increased power draw but potentially shorter run times. In either case, energy savings can be achieved by correcting refrigerant charge to optimum levels based on the manufacturers' specifications. The energy savings and costs of the EEM were determined based on PGE work paper PGE3PHVC160 (Refrigerant Charge Adjustment (RCA)).
Air flow Adjustment
When a building has balanced air flow, it means every room receives the right amount of air in order to ensure that it remains at an ideal temperature throughout the year. Along with keeping members of the building comfortable, correctly balanced airflow has the dual bonus of improving energy efficiency and reducing utility spending. This can be done by many ways, such as adjusting the system dampers, or the small levers located on the round branch ducts. The energy savings and costs of the EEM were determined based on Southern California Edison (SCE) work paper SCE17HCO29 (Residential HVAC Quality Maintenance).
Evaporator & Condenser Coil Cleaning
Dirty or fouled evaporators and condensers restrict air flow, reduce heat transfer efficiency and compressor efficiency, and can increase compressor run time. Coil cleaning eliminates air blockages between fins and can remove dust, grime, and other contaminants from the fin and tube heat transfer surfaces thus improving heat transfer efficiency, decreasing compressor run time, and increasing efficiency TRC Energy Services 11 September 28, 2018
10/03/2024 D 1 Page 111 of 145
Energy Audit Report I City of Vista Jim Porter Recreation Center C"NDAG
The energy savings and costs of the EEM were determined based on PGE work papers PGE3PHVC158 (Evaporator Coil Cleaning) & PGE3PHVC156 (Condenser Coil Cleaning).
Worker performing condenser coil maintenance
EEM 7 — New HVAC Smart Motors
Solution Code Unit
HP-1
Electricity
Savings
(kWh/yr)
430
Electric
Demand
Reduction
(W)
0.21 Annual Total
Savings
($/yr)
$113
Potential
Incentive
$65
Project
Implementation
Cost
$960
Net
Implementation
Cost
M
$895
Net Simple
Payback Period
A
7.9 HP-2
1,229
0.59 $323
$184
$1,212
$1,027
3.2 EEM 7: New HVAC HP-3
Smart Motors
1,229
0.59 $323
$184
$1,212
$1,027
3.2 AC-5
369
0.18 $97
$SS
$708
$653
6.7 AC-6
922
0.44 $243
$138
$1,212
$1,073
4.4 TOTAL
4,180
2.00 $1,100
$627
$5,303
$4,676
4.3 The package HVAC units currently serving Recreation Center are older than 10 years but are still in good condition and are not recommended to replace at this time. The supply fans serving these units currently operate at constant speed and provide conditioned air to the zones during occupied hours. The supply fan motors are inefficient and are a good candidate for replacement.
This measure proposes replacing the supply fan motors with new intelligent switched reluctance type smart programmable motors. These motors can be programmed based on the zone thermostat to modulate the speed down to 30% once the zone setpoint is met.
The savings of these EEM were developed through the use of the representative building eQuest model developed (See Attachment D). The EEM applies to five package units, described in the table below. This TRC Energy Services
10/03/2024
12 D1
September 28, 2018
Energy Audit Report I City of Vista Jim Porter Recreation Center (AMNDAG
measure is eligible for incentives under the SDGE targeted solutions "Constant Air Volume to Variable Air Volume Conversions". Unit AC-4, which serves the Dance Studio was not included in this measure, since it is used sparingly and therefore would not have a significant impact on the energy savings.
HP-1
Equipment Type
Package Unit HP
Qty
1 Make
Carrier
ModelUnit .-
50JS-042--- 601--
3.5 HP-2
Package Unit HP
1 Carrier
50HJQ012--- 631--
10.0 HP-3
Package Unit HP
1 Carrier
50HJQ012--- 631--
10.0 AC-5
Package Unit AC- Cooling Only
1 Trane
WSC036MROA01BD100A1 1300000
3.0 AC-6
Package Unit AC- Cooling Only
1 Trane
WSC090A4ROA09C000A1 B00000
7.5 EEM 8 — Implement Occupancy Setback Controls
HP-1
1,049
-0.31
$276
$84
$1,853
$1,769
6.4 HP-2
2,997
-0.88
$788
$240
$1,853
$1,613
2.0 EEM 8: Occupancy HP-3
Setback
2,997
-0.88
$788
$240
$1,853
$1,613
2.0 AC-5
899
-0.26
$237
$72
$1,853
$1,781
7.5 AC-6
2,248
-0.66
$591
$180
$1,853
$1,673
2.8 TOTAL
10,191
-3.00
$2,681
$815
$9,263
$8,448
3.2 The Jim Porter Recreation Center is conditioned by several packaged AC and Heat Pump units with several associated thermal zones. Currently, the zones are scheduled to maintain their occupied cooling and heating setpoints irrespective of their occupancy levels. This measure recommends implementing zone setback controls based on the occupancy.
As a part of this control strategy, the proposed lighting controls system will provide occupancy inputs to the new smart thermostats. If no occupancy is detected for a predetermined amount of time, the control system will increase the temperature set point to 78°F during cooling mode and lower the setpoint to 680F during heating mode, and force the associated HVAC supply fans to their minimum flow set point. The proposed occupied setback temperature set points will be programmed such that the zone can be brought back to occupied mode temperatures to prevent any discomfort to occupants. Savings are realized by reduction in cooling and heating energy when zones are unoccupied. The costs for this measure include labor and material for installing the ceiling mounted occupancy sensors, new programmable thermostats, and integrating the proposed lighting controls into the thermostats to send occupancy data, in addition to programming of the actual setback controls.
The savings of these EEM were developed through the use of the representative building eQuest model developed (See Attachment D). This measure is eligible for incentives under the SDG&E targeted solution "HVAC — Controls/Controlling Equipment". Unit AC-4, which serves the Dance Studio was not included in this measure, since it is used sparingly and therefore would not have a significant impact on the energy savings.
TRC Energy Services 13 September 28, 2018
10/03/2024 D 1 Page 113 of 145
Energy Audit Report I City of Vista Jim Porter Recreation Center Q"WDAG
Attachments
Attachment A — Lighting Calculations Jim Porter Rec Center Attachment B — Mechanical Calculations Jim Porter Rec Center Attachment C — Specifications
Attachment D — eQuest Package Jim Porter Rec Center
TRC Energy Services
10/03/2024
14 D1
September 28, 2018
City of Vista Tonnage Report 2023 EDCO
January
February
March
April
May
June
=July
August
September
October
November
December
Total
Total Collected
Residential - Total Collected
0 9,285.7r'
3,491.72
:0
3,182.41
3,930.99
3,793.29
4,211.90
4,172.32
3,759.61
4,031.21
3,887.95
3,856.83
3,868.71
3,508.97
45,695.91
Commercial - Total Collected
4,191.51
3,736.89
4,484.05
4,048.83
4,513.93
4,273.92
4,028.40
4,547.60
3,983.95
4,293.87
4,192.52
3,978.62
50,274.09
Rolloff - Total Collected
1,602.48
1,660.99
1,720.69
1,665.43
1,900.18
1,860.81
1,530.24
2,033.06
1,860.38
1,791.12
1,789.46
1,627.84
21,042.68
Residential Diversion Rate
41.7%
45.9%
48.1%
51.6%
48.3%
46.6%
45.6%
48.1%
46.9%
46.4%
44.2%
42.6%
46.4%
Commercial Diversion Rate
9.1%
10.5%
11.9%
11.5%
12.4%
13.0%
12.2%
12.6%
12.6%
11.5%
11.5%
11.8%
11.7%
Roll -Off Diversion Rate
14.3%
17.1%
14.6%
13.5%
14.9%
13.1%
13.4%
16.1%
12.9%
15.4%
16.5%
19.5%
15.1%
Total Diversion collected
2,068.14
2,135.08
2,677.18
2,645.56
2,873.21
2,741.74
2,409.18
2,838.48
2,564.32
2,562.28
2,489.78
2,282.62
30,287.57
Total Disposed collected
7,217.57
6,445.21
7,458.55
6,861.99
7,752.80
7,565.31
6,909.07
7,773.39
7,167.96
7,379.54
7,360.91
6,832.81
86,725.11
Total Diversion Rate collectd
22.3%
24.9%
26.4%
27.8%
27.0%
26.6%
25.9%
26.7%
26.3%
25.8%
25.3%
25.0%
25.9%
Residential Trash
2,035.49
1,722.88
2,038.29
1,836.59
•0
2,179.55
2,229.87
2,045.86
2,091.67
2,064.17
2,065.58
2,157.09
0:
2,014.85
24,481.89
Residential Recycle
523.82
478.05
526.61
474.39
509.66
509.13
485.76
496.51
491.74
493.84
536.50
536.23
6,062.24
Residential Organics
Commercial Trash
932.41
3,809.42
981.48
3,345.19
1,366.09
3,950.33
1,482.31
i•
3,584.35
1,522.69
3,955.78
1,433.32
3,718.06
1,227.99
3,537.81
1,443.03
3,976.05
1,332.04
3,483.68
1,297.41
3,799.27
1,175.12
3,709.46
957.89
3,508.20
15,151.78
44,377.60
Commercial Recycle
303.98
264.68
365.20
302.07
338.79
346.64
284.92
337.28
287.08
296.64
279.51
265.41
3,672.20
Commercial Organics
78.11 127.02
168.52
162.41
219.36
209.22
205.67
234.27
213.19
197.96
203.55
205.01
2,224.29
Roll -Off Trash
1,372.66
1 1,377.14
i
1,469.93
1,441.05
1,617.47
0:1�1
1,617.38
1,325.40
0. 1,705.67
1,620.11
1,514.69
1,494.36
1,309.76
17,865.62
Roll -Off Drywall
-
Roll -Off Inerts
-
Roll -Off C&D Recycled
117.66
152.54
140.51
118.72
121.85
139.16
108.71
185.18
110.90
141.4
1165.64
185.77
1,688.11
Roll -Off C&D Residual
Roll -Off Metals
-
Roll -Off Organics Recyled
94.55 1 114.69
1 90.97
1 88.14
149.65
82.79 79.08
121.00
1 101.75
1 121.43
107.64
110.83
1 1,262.52
Roll -Off Recycle
1 17.611
16.62 1 19.28
1 17.52
1 11.21
21.48 17.05
21.211
27.62 1 13.53
21.82 21.48
1 226.43
Confidential 10/03/2024 Pagel Page 115 of 145 6/12/2024
SB 1383 Compliance Report 2024
Date: 3/31/2024
City: Vista
Total Number of Residential Accounts: 18,138
- Single-family: 17,774
- Multi -family: 364
Total Number of Commercial Accounts: 1,511
- Businesses: 1,211
- Multi -family: 300
SB 1383 Compliance
Multi family complexes with 4 units and less are included in residential counts. Multi- family complexes with S units and more are included in commercial counts. Commercial accounts are compliant when the generator subscribes to the 3- container system or has an approved waiver or verified third party collector.
Residential Collection Container System
Q1
Q2
Q3
Q4
Total Number of Generators
18,138
# of Generators w/ 3- Container System
18,135
Total Number Non -Compliant
3 Percent in Compliance
99.98%
Commercial Collection Container System
Q1
Q2
Q3
Q4
Total Number of Generators
1,511
# of Generators w/ 3- Container System
1,330
- # of Generators w/ De Minimis Waiver
156
- # of Generators w/ Space Waiver
0 - # of Generators w/ Self Haul Form
0 -Verified Third Party
0 Total Number Non -Compliant
25*
Percent in Compliance
98%
* 8 Pending Waivers
CITY OF VISTA
C A L I F 0 R h I A
10/03/2024
D1
City of Vista
Residential Tree/Pollinator Plant Giveaway Program Policy Program
This policy describes the City of Vista's Residential Tree/Pollinator Plant Giveaway Program (Program), which provides trees and pollinator plants free of charge to residents of Vista that meet Program requirements. It provides the process for requesting, planting, and caring for a new tree or pollinator plant under the Program. Residents may participate in the Private Tree/Pollinator Plant Planting Initiative or Residential Tree/Pollinator Plant Giveaway Events.
Program applications will be accepted until Program funds have been expended, and will be approved on a first -come, first -served basis.
a. Private Tree/Pollinator Plant Planting Initiative
Through the Private Property Tree/Pollinator Plant Planting Initiative, Residents can request: one (1) Voucher for picking up an Approved Plant at a Local Nursery; free curbside delivery of an Approved Plant from a Local Nursery; or reimbursement for an Approved Plant purchased at a Local Nursery. Residents must submit an application and meet other Program requirements described in this policy. b. Residential Tree/Pollinator Plant Giveaway Events
Through Residential Tree/Pollinator Plant Giveaway Events, Residents can pick up one (1) free Approved Plant at a City of Vista sponsored giveaway event. Residents must submit an application and meet other Program requirements described in this policy.
II. Purpose
The Program provides trees and pollinator plants to Vista residents to advance environmental equity, instill a sense of belonging, and improve overall health and quality of life for residents and visitors. The Program increases the local tree canopy on private properties, improves wildlife habitat, and mitigates the effects of climate change. The Program further raises public awareness of the benefits of trees and pollinator plants.
III. Definitions
For the purposes of this policy, the following definitions shall apply:
a. Residents: a person living within the city limits of Vista, CA who has verifiable proof of residency. This includes driver's license with a current address, a state of California ID card with a current address, or official mail such as a billing statement from a utility provider with a form of photo identification.
b. Approved Plant: a tree or pollinator plant that is listed on the Vista Private Planting Program List which is posted on the City's webpage.
c. Local Nursery: a nursery that is located in Vista, CA and has an active Vista business license.
d. Proof of Purchase: a receipt from a local nursery which specifies the kind of Approved Plant purchase, the purchase price, where it was purchased, and when it was purchased. 4PWM72-024' D 1 Page 117 of 145
e. Voucher: a certificate from the City to approved Program applicants to cover the cost of a 10 to 15-gallon Approved Plant from a City -selected Local Nursery. f. Planting Location Checklist: a list of required planting conditions for an Approved Plant.
IV. Eligibility Requirements
The Program is open to Residents who own property in the City of Vista or have approval from the property owner to plant an Approved Plant. Participants must follow the Tree Planting Guide, which excludes planting locations in any public right-of-way. The Program limits one Approved Plant per residential address and does not obligate the City to provide a replacement if an Approved Plant fails to thrive.
All participants are required to email, mail or deliver a complete application form in person to the Civic Center. The application is available on the City's Residential Tree Giveaway webpage.
The application requires applicants to submit their name, address, proof of address, certification of suitable planting conditions (including property owner approval), and Waiver of Liability (see Section VI). Participants who receive trees must also agree to the Tree Steward Pledge (see Section VII) and follow the Young Tree Best Care Practices (see Section VIII).
V. Application Process
a. Private Tree/Pollinator Plant Planting Initiative with Voucher i. Complete and submit the application to reserve an Approved Plant Submit a complete application form and Staff will confirm its completion, including that the applicant's address is located within the City of Vista. ii. Receive a Voucher to pick up an Approved Plant
After the application is approved by the City, participants will receive a Voucher via email for an Approved Plant at a specified Local Nursery. iii. Bring Voucher to Local Nursery to choose your Approved Plant Approved applicants bring their Voucher to the specified Local Nursery and present it to the nursery staff onsite. Nursery staff collect the Voucher and direct the resident to the designated area for Approved Plants. Plant options will vary depending on Local Nursery availability. Residents who pick up their Approved Plant must transport it from the Local Nursery to their residence. iv. Plant your Approved Plant at your residence
Once you have your Approved Plant, you must plant it in an area that meets the Tree Planting Guidelines and, for trees, you must follow the Young Tree Care Best Practices.
v. Send confirmation of planting to City
T&M72-024' D 1 Page 118 of 145
Participants must send the City proof of planting by sending a photo of the planted Approved Plant to [email protected].
b. Private Tree/Pollinator Plant Planting Initiative with Curbside Drop Off i. Complete and submit the application to reserve an Approved Plant Submit a complete application form and Staff will confirm its completion, including that the applicant's address is located within the City of Vista.
Participants requesting a curbside drop off must give a first and second Approved Plant species preference. The second preference will be used if none of the first preference is in stock.
Receive confirmation of application approval and delivery date Participants will receive an email from the City confirming their application has been approved and the date that their Approved Plant will be delivered curbside at their residence. The Local Nursery only provides curbside drop off and is not responsible for placing the Approved Plant at a desired location on the property. iii. Plant your Approved Plant at your residence
Once you have your Approved Plant, you must plant it in an area that meets the Tree Planting Guidelines and, for trees, you must follow the Young Tree Care Best Practices.
iv. Send confirmation of planting to City
Participants must send the City proof of planting by sending a photo of the planted Approved Plant to [email protected].
c. Private Tree/Pollinator Plant Planting Initiative with Reimbursement i. Purchase an Approved Plant from a Local Nursery
Go to a Local Nursery and purchase an Approved Plant. Retain your proof of purchase that demonstrates the plant is an Approved Plant, was purchased from a Local Nursery, and lists the cost of the item and date of purchase. The City will only reimburse an Approved Plant purchase that is under $100.00. ii. Plant your Approved Plant at your residence
Once you have your Approved Plant, you must plant it in an area that meets the Tree Planting Guidelines and, for trees, you must follow the Young Tree Care Best Practices.
iii. Complete and submit the reimbursement application with proof of purchase and planting within 30 days of purchase
Submit a complete reimbursement application form with proof of purchase and proof of planting (photo of the planted Approved Plant). Staff will confirm application completion, including that the applicant's address is located within the City of Vista.
4PWM72-024' D 1 Page 119 of 145
iv. Receive your reimbursement from the City
After the application is approved by the City, participants will receive reimbursement from the City via check, mailed to the City of Vista address listed on the application form.
d. Residential Tree/Pollinator Plants Giveaway Events
i. Attend a Residential Tree/Pollinator Plants Giveaway Event The City occasionally hosts Residential Tree/Pollinator Plants Giveaway Events at which the City will provide Approved Plants at no cost to Residents. These events may be in partnership with other City events and may include a tree planting workshop.
ii. In Person Application Process
Participants must complete and submit an application form in -person at the Residential Tree/Pollinator Plants Giveaway Event. If the application is approved by the City, participants will receive an available Approved Plant and must transport it from the event to their residence.
iii. Plant your Approved Plant at your residence
Once you have your Approved Plant, you must plant it in an area that meets the Planting Location Checklist and, for trees, you must follow the Young Tree Care Best Practices.
iv. Send confirmation of planting to City
Participants must send the City proof of planting by sending a photo of the planted Approved Plant to [email protected].
VI. Waiver of Liability
As part of the Program application, participants acknowledge and accept the following:
"I agree to hold harmless the City and each officer and employee thereof from any and all claims, demands, losses, damages or expenses that applicant may sustain or incur resulting from the City's Residential Tree/Pollinator Plant Giveaway Program." VII. Tree Steward Pledge
Experts agree that a newly planted tree typically needs one year for each inch in diameter of the trunk to regain a normal root system. For example, a three-inch diameter newly planted tree will need at least three years in the ground to become fully established. As part of the application, Program participants must agree to the following:
T&M72-024' D 1 Page 120 of 145
"I pledge to plant my tree using the best practices videos on the City's website, paying special attention to site placement, using the tree's root flare to determine proper planting depth, and potential conflicts and/or conditions that may affect the tree's health as it establishes and grows into maturity.
I pledge to water my tree regularly (10-15 gallons per week for a period of up to 5 years) to help it fully establish and grow strong.
I pledge to maintain a watering basin at the base of my tree, and I will keep this area free of debris.
I pledge to keep my tree properly staked for a period of two years before removing them, so its trunk doesn't slant while its roots are growing and forming a strong foundation.
I pledge to monitor the health of my tree and will contact a certified arborist or tree expert for guidance as necessary."
VIII. Young Tree Care Best Practices
All trees start small and much of a tree's success and development is determined in its first five years during a period referred to as young tree establishment. During this time, the tree is spreading critical roots and branches, adapting to environmental conditions (like water availability), and gaining stability from interactions with winds and storms/drought. Therefore, young tree care activities are essential — like supplemental watering, prune training, temporary staking, and mulching. Note: many of these activities can taper off to as -needed activities after the tree is established.
For the best possible outcome for your tree, it is highly recommended that prior to the pickup and planting of your tree, you review tree planting guidelines and videos posted on the Tree & Urban Forest Management webpage or attend a tree planting workshop hosted by Tree San Diego.
Consideration of your planting location is extremely important. Contact DigAlert (Call 811) to make sure you are avoiding your underground utilities such as; water, sewer, electrical, and gas lines. Tree roots can be destructive to these underground utilities. In addition to not being in the public right-of-way, your tree should not be planted closer than 5 feet to a sidewalk as tree roots can interfere with the stability of the sidewalk.
T&M72-024' D 1 Page 121 of 145
V
CITY OF VISTA
C A L I F 0 R H I A
Qualifying Trees and Pollinators
a A a
— Arroyo Willow*
Native Trees
Fremont Cottonwood*
—
African Sumac*
Hollyleaf Cherry
'
Utility Friendly
Crape Myrtle
Honey Mesquite*
Trees
Desert Museum Palo Verde*
Red Willow*
Golden Medallion
Sandbar Willow*
Fremont Cottonwood
Little Gem Magnolia
Scrub Oak*
Black Willow* Western Sycamore
Newport Purple -Leaf Plum*
Golden Medallion
Western Redbud
Blue Elderberry* Desert Willow*
Coastal Live Oak Engelmann Oak
African Fern Pine
Regionally Friendly Aleppo Pine
Apple
Trees
Apricot
Australia Willow
Fruit Trees
_
Cherry*
Bay Laurel
R g-
Brisbane Box
Guava*
=
Peach
Deodar Cedar*
Plum
Fruitless Mulberry*
Pomegranate*
Purple Leaf
•
PeachTree
Loquat*
Strawberry Tree Eastern Redbud*
Nectarine
Wilson Olive
Indian Laurel Fig
Strawberry Tree
—
Narrowleaf Milkweed*
Jacaranda
Pollinators
Sweetgum*
—
Woolly pod Milkweed*
10/03/2024
*Trees that are available for Reimbursement Program Only.
List is subject to change of to nursery availability. Pa 122 of 145
0. a
e@
e
3 m
m
#
a
a
s
e
e
e
e
ƒ
§
a
m
±
k
..
3 /
E
CZ¥
§
E
O
ƒ
E
.>
±
w
2 e
%
M R
%
/
§
/
§
R
§
%
£
\
£
7 \
\
2 _
§
%
/
>1
f
_
c
2 n
m
=
g
5 §ELco
U
e
7CO
§
m
k
7 3
±cn
U
c
±
?
%
%?//
e
e
a
a
e
cn
k
0 E
�
k_
/
§
�
�
ƒ
ƒ
\
%
�
�
o
/
b
\
»
/
c
CD
/
e
�
)
\
5 a)�
-
�
%
_
4 «
I
£
»
»
E
/
>
ƒ
L-
�
a-
":T
q
/
/
m
CD
#
m
w
2 <
d
a
/
/
V)
}
Q
2 /
7 .
u
*
\\
2 c�
a
/
v/
2 k
3 U
D
�"lq% 2024 Dl Page123 Of145
CIpF VISTA D1: Ash Can Placement and Program
--7- _ � ilk
-
C I TY 0 F V I S TA. C 0 M
• Location Suggestions:
2. Corner of North Santa Fe & Townsite
*Per Public Works Team - No additional Signage can be added to this location 10/03/2024
D1
• Location Suggestions:
3. Corner of North Santa Fe & California
10/03/2024
D1 Page 126 of 145
CITY/ pF VISTAD1: Ash Can Placement and Program
CITYOFVISTA. COM
• Location Suggestions:
6. On Main Street, In Front of Vista Village Pub
*This location will be replacing a current Citv Owned Ash Can 10/03/2024 D1 Page 128 of 145
• Location Suggestions:
7. In the Alley Behind Curbside Cafe
*This location will be replacing a current City Owned Ash Can 10/03/2024 D1 Page 129 of 145
• Location Suggestions:
8. In Front of the Vistonian on S. Santa Fe
10/03/2024
D1 Page 130 of 145
CITY/ pF V�STq DI: Ash Can Placement and Program
7IW
y --�--_ •,,,, � �Er�e•as M�xi��n Fo z ��'�
—47
MtI
'�Ctvic_C.enPe'r Dr`
C vrc`Cenier Dr
k� Q
CITYOFVISTA.COM
• Location Suggestions:
.`
10. Corner of South Citrus and East Broadway
-9.ml
10/03/2024 D1 Page 132 of 145
CITY OF VISTA
71-F
V."
D1: Ash Can Placement and Program
C I TYOFV I STA.CO M
• Location Suggestions:
12. Near the Gazebo at the Indiana & Main Street
10/03/2024
D1
• Location Suggestions:
13. In the Parking Lot behind Vista Village Pub
10/03/2024
D1 Page 135 of 145
CITY/ pF VISTA D 1: Ash Can Placement and Program
...
CITYOFVISTA.COM
CITY/ pF VISTAD1: Ash Can Placement and Program
\
AL si
\\` _
V n:
CITYOFVISTA.COM
• Alternate Location Suggestion:
On Main Street in Front of B&B Liquor
(several reports of litter from VCC clean up )
F I
h. A
10/03/2024 D1 Page 138 of 145
City Owned Ash Can Locations
'All
New ILACSD Ash Can Locations
10/03/2024 Dl Page 139 of 145
Service
Date
Main Street
butts in
container
VVP butts on
ground
Alley butts
in
container
Curbside
butts on
ground
Olive butts
in
container
NCTD
butts on
ground
3/18/2024
4 0
5 0
9 37
3/25/2024
17 0
7 3
8 3
4/1/2024
12 0
11 0
10 1
4/8/2024
10 1
9 0
11 1
4/15/2024
8 0
12 0
9 0
4/22/2024
8 1
10 1
12 15
4/29/2024
17 0
11 0
21 2
5/6/2024
22 0
12 0
14 1
5/13/2024
25 0
2 0
19 3
5/20/2024
24 1
22 0
11 2
5/28/2024
26 1
6 0
15 2
6/3/2024
25 0
7 0
12 4
6/10/2024
29 0
11 0
15 2
6/18/2024
39 0
15 0
40 3
6/24/2024
34 0
11 0
17 1
7/1/2024
44 0
6 0
22 0
7/8/2024
25 0
15 2
14 1
7/13/2024
20 0
40 0
25 0
7/22/2024
51 1
63 0
33 2
7/27/2024
15 3
30 0
35 4
8/5/2024
45 0
34 0
26 0
8/12/2024
47 0
39 0
19 3
8/19/2024
44 0
29 1
29 0
8/26/2024
29 1
35 16
0 9/3/2024
25 0
35 tl
17 0
9/9/2024
7 2
44 17
1 9/16/2024
26 0
30 0
34 6
9/23/2024
23 1
31 0
19 0
Averages 1 25.04 1 0.43 1 20.79 1 0.29 1 18.89 13.36
10/03/2024 D1 Page 140 of 145
Workplan Development Guidelines
Step 1: Review purpose of Commission as defined by the Vista Municipal Code 2.50.010 Step 2: Discuss and Review relevant City Council Goals, Climate Action Plan Goals & previously discussed interests Step 3: Brainstorm goals, projects, or priorities of the Commission and determine the following:
1. Identify priorities, goals, projects, ideas, etc.
2. Determine benefit, if project or item is completed
3. Is it mandated by State or local law?
4. Is it City Council directed?
5. Would the task or item require a policy change at City Council level?
6. Resources needed for completion?
a. Support staff, volunteers, subcommittee?
7. Completion time?
a. 6 months? 1 year? 2 years?
8. Measurement criteria?
a. How will we know we are on track and it is effective? Step 4: Prioritize projects from urgent to low priority Step 5: Prepare final work plan for commission approval Step 6: Use final workplan throughout the term of the plan as a guide to focus in on the work at hand Step 7: Report out on work plan priorities to City Council, which should include:
1. List of "approved" priorities or goals
2. Status of each item, including any additional resources required in order to complete
3. If an item on the list is not finished, indicated why it didn't occur and list out any additional time and/or resources that will be needed in order to complete
10/03/2024 D 1 Page 141 of 145
Environmental Commission
Work Plan 2024-2026
Commission's Purpose:
Per VMC 2.50.010, the purpose of the Environmental Commission is to promote and support the City's climate and environmental responsibility goals and to advise the City Council and the City Manager on matters relating to the environmental health, environmental conservation, environmental justice, and environmental sustainability in the City. 2024-2026 City Council Goals Related to Commission:
• A Cleaner, More Beautiful Vista
o Increase litter cleanup activities
o Eliminate visible blight, illegal graffiti, junk and debris o Continue to work with Caltrans to improve the on/off ramp areas o Implement beautification projects in neighborhoods that are neglected o Enhance the public right-of-way where possible
• Climate and Environmental Responsibility
o Establish certified cool zones
o Ensure high enrollment rate in our Clean Energy Alliance o Pursue grant funding for climate and environmental responsibility o Increase the solar at City facilities
o Increase the number of electric vehicle charging stations o Create more tree canopies, community gardens, pocket parks, etc. o Encourage more food pantries to deal with food resiliency 10/03/2024 D 1 Page 142 of 145
2021 CAP Update Goals
• Strategy 1— Increase use of zero-emission/alternative fuel vehicles o Measure T-1: Transition to a clean and more efficient municipal vehicle fleet o Measure T-2: Increase electric vehicle charging stations at public facilities o Measure T-3: Require electric vehicle charging stations at new multi -family and commercial developments • Strategy 2 — Reduce vehicle miles traveled
o Measure T-4: Participate in the San Diego Association of Government's iCommute vanpool program o Measure T-5: Implement the City's bicycle master plan o Measure T-6: Increase Density and Mixed -Use Development • Strategy 3 — Reduce fossil fuel use
o Measure T-7: Require electric -powered or alternative fueled construction equipment • Strategy 4 — Increase building energy efficiency
o Measure E-1: Implement energy efficient projects in municipal facilities • Strategy 5 — Increase renewable and zero -carbon energy o Measure E-2: Continue photovoltaic installation at municipal facilities o Measure E-3: Join a program to increase grid -supply renewable and zero -carbon electricity • Strategy 6 — Reduce and recycle solid waste
o Measure W-1: Reduce solid waste disposal and increase recycling • Strategy 7 — Carbon sequestration
o Measure C-1: Increase tree planting at municipal facilities and public rights -of -way o Measure C-2: Increase tree planting at new private properties Ideas from 412412024 Meeting:
• Reduction of litter, waste, plastics, tobacco waste
• Increasing Ash Can Program
• Increasing Tree canopy & community gardens
• Improving bike safety at schools
• Raise awareness in the Sustainability Activities at the City • Look into more food pantries
• Make sure communities of concern have access to programs • Find a climate friendly way to decorate for the holidays 10/03/2024 D 1 Page 143 of 145
Environmental Commission Workplan 2024-2026
Priority
Commission Projects
FocusAreas
Status
Residential Tree Program has been successful, approving 180+ trees for 1 Increase Vista's Tree Canopy
4 residents as of June 2024. Staff has updated the Approved List to include a wider range of Native Trees & Pollinator Plants. Staff plans to do another push for program advertisement in Fall 2024.
2 Promote Current Community Clean Ups &
6 Current efforts being spearheaded by outside organizations, Stormwater Initiate Future Clean Ups
division hosts cleanups a few times a year
3 Review Current CAP Progress to prepare for
2 Commission to start receiving reports on CAP status at July 2024 CAP Update
Meeting, CAP will need to start update no later than 2026 4 Research & Implement Sustainable Special
3 Events
Organics Composting & Recycling Outreach
EDCO advertises Organics & Recycling Tips through their quarterly 5 Campaign
1 Newsletter, Staff held a workshop with the Vista Chamber on organics & recycling for businesses in May 2024
6 Expand Single Use Plastics Reduction &
1 June 2024: Staff working with IT to incorporate Polystyrene Use Styrofoam Ban Program
Reporting to Access Vista App
7 Support Outreach for City's Sustainability
5 Staff tables many community events, including Earth Day 2024 Efforts
8 Research Green Awards programs for the City,
5 Staff currently working on promoting the Green Business Network Businesses & Community
through the Vista Chamber
9 Research & Promote Solar & Battery Programs
7 Clean Energy Alliance has the Solar Plus Program for residents 10 Research Opportunities to Increase Walkable
8 Communities
11 Expand Ash Can Program
6 Commission received presentation from VCC & made a decision on when to go to Council with expanded program in June 2024
12 Promote Increase in Bike Safety &
8 Staff currently partnering with San Diego County Bike Coalition for the E- Infrastructure
bike Safety Program.
10/03/2024 D 1 Page 144 of 145
13 Research & Initiate Electric Vehicle Purchasing
and Charging Incentive Programs
7 City currently working on CIP project that will bring around 90 EV chargers to city owned facilities for public use
14 Become a member of Bee City USA
4 15
Initiate a Pollinator Program
4 Pollinators included on the tree giveaway program
16 Implement a Native Plant Policy
4 Commission Focus Areas
1 Solid Waste Reduction
2 CAP Update Review
3 Beautify Vista
4 Greening Vista
5 Sustainability Outreach
6 Litter Abatement
7 Energy Efficiency
8 Sustainable Transportation
Environmental Commission Additional Future Workplan Projects Priority
Commission Projects
Focus Areas
Status
17 Monitor Success of SB1383 Implementation
1 18
Research & Promote Programs to Reduce Vehicle Miles Traveled in Vista 8 19
Participate in the Water Conservation Challenge
5 20
Research & Implement Sustainable Holiday Decorations
3 21
Monitor Construction & Demolition Diversion
1 22
Promote Outreach Stormwater Pollution
6 23
Research & Create a Citywide Rebate Program hub to promote the Inflation Reduction Act incentives (Heat Pumps & Induction Cooktops) 7 24
Research & Implement adopt -a -block and/or adopt -a -drain program 4 25
Research educational programs for people to pick up their pet waste 4 10/03/2024 D1 Page 145 of 145
Climate Action Plan Implementation
Update
City Council Workshop 10.3.2024
CITYOFVISTA.COM
• Background:
—The Climate Action Plan (CAP) was adopted
2012 and updated 2021
— Contains
7 Strategies and
13 measures
— Previous
CAP update was
Oct.
5th 2023
CITY OF D1. CAP Implementation Update
CITYOFVISTA.COM
The ReCAP Snapshot is prepared for the City as
a part of the SANDAL Regional climate Action
Planning Framework (Pe CAP) to support, but
not replace, cities' monitoring afgreenhouse gas
(GHG) emissions and/or climate action plan (CAP)
Implementation aver time. The 2020 Snapshots are
unique as the Covid-1g pandemic had impacts on
our day -to -ay activities in 2020. More information,
including a FAQ doeument is available at
FAQ (sandag.org).
2020 GHG
Inventory*
cHainwnt— =gas —
be4 avalude Cats fmm 2120
for all Istetl sxtws and excludes
mad r���or�oa
I© ELECTRICITY
® NATURALGAS
m souD—L
© WATER
® WASTEWATER
OFF -Roan
TRANSPORTATION
ON -ROAD
TRANSPORTATION
MTCo2e
'sop.
Image 1:T 1 Freeway Vehicle Mike Tre Ie in
San D11* Region 12019. 202 ,, 20211
14 1.0 �`rop
i2-
ae
m 0.4 Pe io .de peak
a2 pedptl nlRnway
trawl was d—i
-11, 2U20
mm 2e19
1 z a 4 s s 1 s 9 1R n 12
Ma1th
�,.�p�M��alaa,�saR��ds� �we�mm�keood
135,000
N
1OOp00
WOW
A
so,aoo � k
O2151000
n,OOo O
a ■ IIIIIIIIIII� 3,000. Av
ImarwJ
102,928
population in 2020
19 square miles
31,537
occupied housing
units in 2020
Current CAP progress:
Updated 2021
Subregion:
North County Inland
• G H G Inventory
— Measures the amount of green
house gases from various
community activities
— City previously received these
from SANDAG, but will no longer
— Most recent inventory was
incomplete
— City will need to pursue an
additional inventory with future
CAP Update
0 CITYOFVISTA.COM
• Strategy 1 - Increase Use of Zero Emission/Alternative Fuel Vehicles — Measure T-1: Transition to a Clean and more Fuel -
Efficient Municipal Vehicle Fleet
• Goal: Replace 47 non-public safety, light duty vehicles to EV or PH EV by 2030
• Status: In progress
• City only has 43 non-public safety, light duty vehicles in their fleet
• Currently the City has replaced 4 vehicles in their fleet with EV's
• Strategy 1 - Increase Use of Zero
Emission/Alternative Fuel Vehicles
— Measure T-1: Transition to a
Clean and more Fuel -Efficient
Municipal Vehicle Fleet
• Staff is following the CARB
Milestones program to phase
into a 100% Zero Emission
Vehicle fleet by 2042
• Strategy 1 - Increase Use of Zero Emission/Alternative Fuel Vehicles — Measure T-2: Increase Electric Vehicle Charging Stations at Public Facilities
• Goal: Install 20 public EV charging stations by 2030
• Status: In Progress - Goal will be met and/or surpassed by 2030 • Currently there are two EV chargers for public use in historic downtown Vista
• CIP Project 8902 will add 90 EV Chargers (14 Level 3 fast chargers & 76 Level 2 chargers) at city owned properties with most of them being for public use
• Strategy 1 - Increase Use of Zero Emission/Alternative Fuel Vehicles — Measure T-3: Require Electric Vehicle Charging Stations at New Multi -Family and Commercial Developments
• Goal: Install 188 new EV charging stations at new multi -family developments by 2030 and Install 108 new EV charging stations at new commercial developments by 2030
• Status: In progress
• The City follows the states requirements for EV charging at new developments
• Since 2020 there have been 63 chargers at commercial
developments, and 16 at multifamily developments
• Strategy 1 - Increase Use of Zero Emission/Alternative Fuel Vehicles
— Measure T-3: Require Electric Vehicle Charging
Stations at New Multi -Family and Commercial
Developments
• Goal is dependent on new
developments being built within the city
• Staff is monitoring state law and
regulations and internally discussing if
a code update may be needed
• Strategy 2 - Reduce Vehicle Miles Traveled
— Measure T-4: Participate in the San Diego Association of Government's Commute Vanpool Program
• Goal: Maintain a minimum of 18 SANDAG vanpools annually that start or end in the city
• Status: In progress
• Currently there are 13 vanpools that start or end in Vista • Staff has been advertising the program to Vista businesses through the Economic Development Newsletter & Our Vista Magazine and internally for Vista staff
• Strategy 2 - Reduce Vehicle Miles Traveled
— Measure T-5: Implement the City's Bicycle Master Plan • Goal: Install an additional 12 miles of two-way bicycle lanes (Class II or better) by 2030
• Status: In Progress
• Bicycle Master plan was published in 2014 and created a citywide bicycle network with a prioritization list of projects. • City has added 2.2 miles of bike lanes since 2020
• SA N DAG's Inland Rail Trail will add 3 miles of two-way bike lanes connecting North County Cities
• Strategy 2 - Reduce Vehicle Miles Traveled
— Measure T-5: Implement the City's
Bicycle Master Plan
• City has been improving the safety of
the current biking infrastructure with
green paint and separating bike
lanes
• Staff also received a grant to do a
comprehensive update to the bicycle
master plan
it intersections �1
CITY OF VISTA
areaw tmgemerxec Breen wwe pares ...
• Strategy 2 - Reduce Vehicle Miles Traveled
— Measure T-6: Increase Density and
Mixed -Use Development
• Goal: Complete the Vista Palomar and Vista
Melrose 47 projects
• Status: Complete - Goal is met and could
be surpassed by 2030
• Both projects are complete and the General
Plan Update for 2050 focuses on
increasing mixed use and density in City's
high traffic areas
• Strategy 3 - Reduce Fossil Fuel Use
— Measure T-7: Require Electric -Powered or Alternative Fueled Construction Equipment
• Goal: Require that 30% of construction equipment in new development projects be electric -powered or alternatively fueled
• Status: In Progress / Not Feasible
• City and state does not have an ordinance or requirement for developers to use a certain percentage of electric or
alternatively fueled equipment
Strategy 3 - Reduce Fossil Fuel Use
— Measure T-7: Require Electric -Powered or Alternative Fueled Construction Equipment
• City includes a condition of approval to use electric or alternative powered equipment where feasible
• Staff will continue to monitor state laws & regulations to see if there is a need for a code change
• Achieving this goal would require advancements in
technology for alternatively fueled construction equipment
Strategy 4 - Increase Building Energy Efficiency
— Measure E-1: Implement Energy Efficient Projects in
Municipal Facilities
• Goal: Complete energy efficiency projects identified in the 2018 energy audit that will reduce municipal facility energy use by 1 million kWh by 2030
• Status: Complete - goal is met and could be surpassed by 2030 • Staff confirmed that that all projects have been completed either prior or after the audit's completion
• Staff will continue to pursue energy efficiency projects with all new facility upgrades and maintenance
• Strategy 5 - Increase Renewable and Zero -Carbon Energy — Measure E-2: Continue Photovoltaic Installation at
Municipal Facilities
• Goal: Install 400 kW behind -the -meter PV at city facilities by 2030
• Status: In progress - goal will be met and/or surpassed by 2030 • PV installation at Public Works has been completed and there is solar at the Senior Center
• The Civic Center project will add 621 kW behind -the -meter PV and is expected to be completed by March 2025 .;.
• Staff will continue to pursue grants and other solar ��� opportunities T
• Strategy 5 - Increase Renewable and Zero -Carbon Energy — Measure E-3: Join a Program to Increase Grid -Supply
Renewable and Zero -Carbon Electricity
• Goal: Achieve 90% renewable or zero -carbon electricity by 2030 • Status: In progress - likely that goal will be met by 2030 • The City officially enrolled themselves in 100% renewable energy and all other Vista energy customers in 50% renewable and 75% carbon free energy with Clean Energy Alliance in April 2024 • Vista has a 96.4% participation rate
• Staff will continue to provide outreach and education to residents and businesses, encouraging them to opt -up to 100% renewable energy
Strategy 6 - Reduce and Recycle Solid Waste
— Measure W-1: Reduce Solid Waste Disposal and Increase Recycling
• Goal: Achieve 85% waste diversion citywide (equivalent to reducing per capita waste landfilled to two lbs. per person) by 2030. • Status: In Progress
• The City is in compliance with state law, but the current total diversion rate is 25.9% or about 5.6 lbs. per person
• City works with EDCO, I Love a Clean San Diego and the Solana Center to educate residents and businesses
Strategy 6
Enviri nI I ( �ntal Times„,
B f a - ewsd6orltyou v7on ant and crestomek cern!'ces
Organics Recycling Tips to Reduce Odors & Critters
Summer sou
Warm weather ran bring umque chagenges for recycling your organic waste. Hoverer, It down heve m mesa stlnky food 1 Inside This lssu scmps!Below iewtlpstohelp reduce odors anddder Mr ,s. �' a 1. Freeze your Scraps: Place the fxoaen organic waste dlreclly ' a�� r into yom organka aft the night before, or the ...Luis of your mlleetlon dry to help prevent sdnky earls.
Holiday Schedule Layer it om Anything yn can do to keep the contents of ym organics cart dry: cola really help to reduce adax
3. Wrapping your food snaps to paper, bags, newspaper or placing them In grassy playa mwd.g seprnubn x. ana bares wIr help keep yam cart dry. If yov have ]andscape waste m coffee grounds, they make an ezcellent topping for food scraps. They will help absorb moisture and mhtinirs owm.bents m: odor! Please remember do not sae p!astic bep sf arty kind, as they coat—i-le the �°'naY��Y °^ material.
4. Keep it dean: Rinse your cart with mild map and water when necessary. Pieampour the a leymbv��➢.yto➢owing dirty ante,onss the lava and never its Me street or down she storm dmin! Follow with �hotidry,>u ®ire w..t, T,mIling IAmgsada Into your cart.
5. Dealing with Pats: Bugs am admded m organic materiel as It breaks dawn By keeping woma., n.y the cart lid closed a all times, placing your cart out for collection every week and mIl e,Ing the tips above, It will really help ainlm[se the bugs In yourorganice—L Nay°rsa�.
Where to Dispose of Household Hazardous Waste?
aru®,nub. uo�a,.a
"b'b°w�'�awiun, Hazardous waste is unused ce lehwer portions of products containing a,il�,b T�jy y� tmtic chemlosh used around the home. Products labeled Cantlen, Warning, Deng., Pelson, Tnr ,Flammable arCmmshe ere considered Can We Hdp? hazardous.
Residents may vlslt the North County Reglanal Household Hazardous ai a er Waste(HrTW) collection tudity located a 1145 East Taylor Street,Vista. (>uour�°rt �a �, open 5emrdays(except hogday weekends) 9a.m. to 3 p.m. '�c"e%"� �' z Residents 65 or older, ar houselwlde possescing n mglstered handl p .ynase �naWaa placard can arrange for free door-to-door collection sernces by calling ®� (809) 714-1195.
- Reduce and Recycle Solid Waste
— Measure W-1: Reduce Solid Waste
Disposal and Increase Recycling
• City hosts annual workshops and EDCO
helps educate residents and
businesses
• Staff will continue to work with our
partners to ensure compliance and
work toward our diversion goal
Strategy 7 - Carbon Sequestration
— Measure C-1: Increase Tree Planting at
Municipal Facilities and Public Rights of
Way
• Goal: Plant an average of 100 trees annually
through 2030 (1,300 net new trees by 2030)
• Status: In progress - likely that goal will be met
by 2030 deadline
• Since 2020, Vista has planted 871 trees at
various city facilities, parks, and public rights -of - way
• Staff will continue to focus on tree planting with
future park and public space redevelopment
;
• Strategy 7 - Carbon Sequestration
— Measure C-2: Increase Tree Planting at New Private
Properties
• Goal: Plant an average of 500 new trees annually at new developments through 2030 (5,500 net new trees by 2030) • Status: In Progress - Likely that goal will be met by 2030 • City's landscape manual was updated in 2022 which requires one tree per every 4-6 parking spots
• There have been 2,266 trees have been planted at new
developments since 2020
• Staff will continue to push for additional tree planting
CITY OF D1, CAP Implementation Update
ether Prole
CITYOFVISTA.COM
Residential Tree Giveaway Program
— Program started April 22, 2024
— Over 300 applicants
• 257 approved and 236 trees have been given
to residents
— Residents are required to take a tree
steward pledge, follow young tree best care
practices and send in a photo of their
planted tree
— Should have funding through Earth Day
2025
— Helps support Measure C-2 of the CAP
�1!•j c�P��ta
ht`j�° •M�9 b\are@ e�\ma��
p000 •'• • e • • Q�
W^e`
W"'Pta°r,c�a�ae ae
�o�ua���va �� 9�a tt^saaea�9 ;s
�^ate9^eat °^�tde t°s P
�ne�°�'�e\ctiat4°Q' nfo�t
c{oFV�'!
FREE 1'
\ IQE
Giant a tree rhisSEEs�
0 000
.
w,
Ptog el'n'�F �T �itfty n
esitlen�rt rn r °n Ci t Pilp a
uaf`a�9h rhl `sway r
O o00
orynta t thai 9 b/e �92
blb�tte tot iy fOP Fj�T=Vista
anO�"Mscan
Q Q
�
nsttryaaQR �t'�to
r40
Ash Can Program
— Started in January 2024
— Currently 3 ash cans that are city
owned
— Staff working on Agreement with I Love
a Clean San Diego to install and service
the 15 additional Ash Cans
— Locations were voted on by the
Environmental Commission
.1
I
i a VS r T, &M-9y
Mxe ull-,
". iL�
Q-R%5,KM,, 9 " WIT,
"M M
'VIE
W4
City Owned Ash Can Locations= New ILACSD Ash Can Locations
CITYOMS&COM
VIST A IS FOAM FREE!
pER V MC 11•04
Banned
plates 0 .
Styrofoam
'#,�
ciryoev�n
products Bowls �� roiY�tnene
Include
fstytosnam>'s
eav'emely difCiNlt
A
14 to reoycie, "'ng
,• DE
_XUL 0(�
� r 't alarga
comi�nent of
Littet and
CDMIDA DE N
pollution, the
[esun bein8
SOLO USO
� dan+age to loc
�� wildlife ani
DISPONIBLES
LEpRNMORE ` SOLO
ok�_°
Takennt j�
got
Containets �yt
� L
LEY DE CALIFORNIA
AB 1276
i III�v
N1
�y
I
UBiFNGA MAN
INFONMACION
Polystyrene Ban & Single Use Plastics
Reduction Program
- Starting in 2023, food service providers are
no longer allowed to provide polystyrene
(Styrofoam) products to their customers
- Complaint based process, where people can
report receiving Styrofoam on the Access
Vista App
Businesses are presented with education
and outreach and requested to be on a
compliance plan prior to potentially being
served a fine
- Waiver program offered to out of compliance
businesses who are eligible
- Supports measure W-1 of CAP
• San Diego Regional Green
Business Network
— Free Consulting program to help
Vista businesses adopt
environmentally friendly practices
— Focus on energy efficiency, water
conservation and waste reduction
— Since 2024, staff has been
advertising the program through
Economic Development and the
Chamber
— Supports several CAP measures
Cl1. nF`
'vC
/SCCN CCCEfO,
IPME4 ° o
GR
EEN � t
Cp
BUs�HEs�
.KEEN
NARK
�;, t,. CERS\F\e econoc�m�e^to coma°^
� c
V�ER� � Ude asoP°Skecpt^ttas
NGi`� obteo9. oae 9
` ` • oPa a P/Otea'ec e\ NMCl fYf flff �►.
Eice/ G v O f `O PYb a o amb e^te PoCI
Nme UYIffICH(/Ef N4EYYIC% dflflCp
�� . Rea sz N \\os cc°rsos IfNC jM�tf!
6RN RK • aFlt oeeea °\e�9o� oo` e
sos
obl¢^et m9s
�o
; � .�&
.k
• E-Bike Safety and Rebate Program
— Began in June 2024, promoting safe
and sustainable transportation
options
— Staff working with VUSD since the
winter of 2023 to promote VUSD's
bike safety program & new permit
requirements for students
— Classes held once a month by the
Bike Coalition
— Supports Strategy 2 of the CAP
• Events - Earth Month & Cyclovia
— Earth Month 2024
• Vista participated in the Alta Vista
Botanical Gardens Earth Day festival
— Cyclovia
• Staff hosted first ever Cyclovia
festival in Vista to promote
sustainability, clean air, and active
transportation
CYC V I A
vise
• G ra nts
— Awarded:
• Integrated Pest Management Plan - $167,203
• Urban and Community Forestry Program for N. Santa Fe tree canopy - $1,593,798 • CalRecycle SB1383 Organics - $266,591
• CalTrans Sustainable Transportation Planning - $400,000 — Pending:
• ICARP Urban Tree Management Plan - $250,000
• Source Capture Exhaust Extraction Systems - $269,300
• CalTrans Citywide Active Transportation Planning- $752,000 — Upcoming:
• SANDAG Sustainable Growth CAP Update Funding- TBD
• Environmental Commission
— Started in April 2024
— Promotes the City's climate and
environmental goals while advising City
Manager and Council on environmental
matters
— Established a 2-year Workplan, 16 goal
p ro j e cts
— Receives presentations from many Not
different environmentally focused
P �me
organizations
ppBN t0 ENE P�e�m m„maoeoA 9pO��
✓ team obouc°�meA rreA °"d
5ec�^w\ ed
wcvre en.mo^
✓ F'ed ouch°`^' Y°" aa^
wy,atY°" can da to fie�P
Clry of V� �
CAOq
MIEpC R7p
!AS'S OOLES PMA
CITY OF D1, CAP Implementation Update
CITYOFVISTA.COM
Possible CAP Outline
1. Citizen Involvement
a. Environmental Commission
b. Emergency declaration
c. Informing the commission
d. Dashboards — Citizen safety and inclusion
i. American forests
ii. Equity Quant
iii. City dashboards
iv. Climate Trace
v. WasteMAP
vi. Alert California
vii. NOAA's Climate Ready Nation
e. Measurable goals, frequent reporting, remediation as needed
2. Power Generation
a. Microgrids, VPPS, CEA and DERMS leading to IOT
b. Support model law and adopting VPP standards
c. Renters: Community Power, Balcony Solar, EV Charging
3. Sustainable Transport (#1 for venters)
a. Master trail plan
b. 15-minute villages connected with public transit
i. Integrate super blocks and complete streets
c. Empanel a depave team
4. Reduce building emissions (#2 for renters)
a. Use integrative design (Amory Lovins) to retrofit building for efficiency
b. Use Passive House, LEED, California's Build -It -Green standards
S. Implement California's Nature -Based Solutions (NBS) standard a. Expand tree canopy
b. Install as many mini -forests as possible
i. At least one in every school
ii. School district CAP
c. Establish no -vehicular zones and a "downtown" area
i. Include a tree covered Sokolow
d. Establish chemical safety regulations
L Ban PFAS (Roundup) and other harmful chemicals
ii. Ban artificial turf
ill. Ban single -use plastics
iv. Ban outdoor smoking and smoking in multi -family
housing
e. Fashion (#5 for renters)
6. Water projects
a. Plan for quantity
L Water reuse
ii. Swales
ill. Greywater reuse
iv. Stormwater capture system
v. Incentive everyone: remove grass, rain barrels
vi. Encourage low -flow appliances
b. Water quality
L Monitor tests and report on dashboard
7. Food and Agriculture (#3 for renters)
a. Encourage all farms to use regenerative techniques (Marin Carbon Project)
b. Open a Free Food Market like D10 Community Market in San Francisco
8. Reduce Embedded Carbon
a. Steel and cement
b. Require integrative design
9. Climate Finance (#4 for renters)
a. Establish a Public Bank (Green Bank)
b. Remove cash from top 4 US banks
c. Divest fossil projects
d. Give employees fossil -free retirement investment options e. Cancel insurance policies if company insures fossil
projects
10. Set up 9 committees in Environmental Commission