Cities Index.
cc 2024 AR 12/10 cip 8902 city-wide ev charging stations project

Vista City Council
December 10, 2024

Document
cc 2024 AR 12/10 cip 8902 city-wide ev charging stations project
Meeting
December 10, 2024
Body
Vista City Council
Pages
2
Original file
23 KB
Text extracted from the city's file for reading and search. Open the original on portal.laserfiche.com. That file is the official record.

ACTION:
____________________________
Clerk/Secretary
Department: Engineering Item No: C10
Prepared by:

Daniel Carns, Capital Projects Manager
Erin Adams, Administrative Programs Manager Meeting Date: December 10, 2024 Approved by:

Greg Mayer, Engineering Director
John Conley, City Manager Agenda Location: Consent Calendar SUBJECT: CIP NO. 8902 – CITY-WIDE ELECTRIC VEHICLE CHARGING STATIONS PROJECT –

FIRST AMENDMENT TO THE AGREEMENT WITH PAR WESTERN LINE

CONTRACTORS, LLC
RECOMMENDATION: Adopt City Council Resolution No. 2024- , approving the first amendment to the agreement with PAR Western Line Contractors, LLC for design/build services for the City-Wide Electric Vehicle Charging Stations Project (CIP No. 8902).

CORRELATION TO CITY COUNCIL GOALS: Climate and Environmental Responsibility.

PRIOR ACTION: On June 25, 2024, adopted City Council Resolution No. 2024-109, approving an agreement with PAR Western Line Contractors, LLC. for design/build services for the City-Wide Electric Vehicle Charging Stations Project (CIP No. 8902) (Vote: 4-0, Green absent).

On June 11, 2024, adopted City Council Resolution No. 2024-86, adopting a Capital Project Budget for Fiscal Years 2024/25 and 2025/26 (Vote: 5-0)
STATEMENT ON THE SUBJECT: Capital Improvement Program (CIP) Project No. 8902, the City-Wide Electric Vehicle Charging Stations Project, will design, upgrade electrical services, construct ADA parking and access improvements, and install electric vehicle (EV) charging stations at ten City-owned properties.

The ten sites are located at the Civic Center, Public Works, Sports Park, Luz Duran Park, Brengle Terrace Park, Breeze Hill Park, Shadowridge Park, Wave Water Park, Downtown Parking Lot, and Fire Station No.

6. A total of 99 EV charging stalls consisting of Level 2 and Level 3 chargers for fleet and public use are proposed at these sites. Additionally, this Project promotes the City’s EV Fleet Transition Plan, the Climate Action Plan, and provides GHG-reducing co-benefits by increasing the availability of EV charging stations.

First Amendment to the Design-Build Agreement. On June 25, 2024, the City Council awarded the Design-Build Team (DBT) of PAR Western Line Contractors, LLC (PAR Western) to begin Phase 1 of the project. As outlined in the Design-Build Agreement (Exhibit 4), Phase 1 included development of 90% design plans and the preparation of a Guaranteed Maximum Price (GMP). City staff reviewed the 90% plans and the GMP and negotiated the project costs down from the original amount of $4,398,360 for 90 EV Stalls to the final GMP amount of $3,839,304 for 99 EV stalls. Staff recommends the approval of this first amendment to establish the GMP of $3,839,304 and allow the DBT to proceed with Phase 2 AGENDA
REPORT

CITY COUNCIL

COMMUNITY DEVELOPMENT COMMISSION

SUCCESSOR AGENCY

BUENA SANITATION DISTRICT

JOINT POWERS FINANCING AUTHORITY
Approved above recommendation, adopted City Council Resolution No. 2024-196. Vote: 5-0

ACTION:

____________________________
Clerk/Secretary

Department: Engineering Item No: C10
Prepared by:

Daniel Carns, Capital Projects Manager
Erin Adams, Administrative Programs Manager Meeting Date: December 10, 2024 Approved by:

Greg Mayer, Engineering Director
John Conley, City Manager Agenda Location: Consent Calendar

SUBJECT: CIP NO. 8902 – CITY-WIDE ELECTRIC VEHICLE CHARGING STATIONS PROJECT –

FIRST AMENDMENT TO THE AGREEMENT WITH PAR WESTERN LINE

CONTRACTORS, LLC

RECOMMENDATION: Adopt City Council Resolution No. 2024- , approving the first amendment to the agreement with PAR Western Line Contractors, LLC for design/build services for the City-Wide Electric Vehicle Charging Stations Project (CIP No. 8902).

CORRELATION TO CITY COUNCIL GOALS: Climate and Environmental Responsibility.

PRIOR ACTION: On June 25, 2024, adopted City Council Resolution No. 2024-109, approving an agreement with PAR Western Line Contractors, LLC. for design/build services for the City-Wide Electric Vehicle Charging Stations Project (CIP No. 8902) (Vote: 4-0, Green absent).

On June 11, 2024, adopted City Council Resolution No. 2024-86, adopting a Capital Project Budget for Fiscal Years 2024/25 and 2025/26 (Vote: 5-0)

STATEMENT ON THE SUBJECT: Capital Improvement Program (CIP) Project No. 8902, the City-Wide Electric Vehicle Charging Stations Project, will design, upgrade electrical services, construct ADA parking and access improvements, and install electric vehicle (EV) charging stations at ten City-owned properties.

The ten sites are located at the Civic Center, Public Works, Sports Park, Luz Duran Park, Brengle Terrace Park, Breeze Hill Park, Shadowridge Park, Wave Water Park, Downtown Parking Lot, and Fire Station No.

6. A total of 99 EV charging stalls consisting of Level 2 and Level 3 chargers for fleet and public use are proposed at these sites. Additionally, this Project promotes the City’s EV Fleet Transition Plan, the Climate Action Plan, and provides GHG-reducing co-benefits by increasing the availability of EV charging stations.

First Amendment to the Design-Build Agreement. On June 25, 2024, the City Council awarded the Design-Build Team (DBT) of PAR Western Line Contractors, LLC (PAR Western) to begin Phase 1 of the project. As outlined in the Design-Build Agreement (Exhibit 4), Phase 1 included development of 90% design plans and the preparation of a Guaranteed Maximum Price (GMP). City staff reviewed the 90% plans and the GMP and negotiated the project costs down from the original amount of $4,398,360 for 90 EV Stalls to the final GMP amount of $3,839,304 for 99 EV stalls. Staff recommends the approval of this first amendment to establish the GMP of $3,839,304 and allow the DBT to proceed with Phase 2

AGENDA
REPORT

CITY COUNCIL

COMMUNITY DEVELOPMENT COMMISSION

SUCCESSOR AGENCY

BUENA SANITATION DISTRICT

JOINT POWERS FINANCING AUTHORITY
12/10/2024 C10 1 of 225

MEETING DATE: DECEMBER 10, 2024 PAGE 2
SUBJECT: CIP NO. 8902 – CITY-WIDE ELECTRIC VEHICLE CHARGING STATIONS PROJECT –

FIRST AMENDMENT TO THE AGREEMENT WITH PAR WESTERN LINE CONTRACTORS, LLC
construction services and Phase 3 operation/startup services as specified in Sections 6 and 7 of the original Agreement.

FISCAL IMPACT: The cost of this amendment is $3,377,214, which covers construction costs for the project. Phase 1 design services were $462,090, which brings the new contract ceiling to $3,839,304 for PAR Western to provide design-build services for the design and construction of the City-Wide Electric Vehicle Charging Stations Project, Phase 2 and Phase 3. Sufficient funding is budgeted and available in the Fiscal Years 2024/25 and 2025/26 Capital Improvement Budgets in CIP No. 8902, the City-Wide Electrical Vehicle Charging Stations Project Source Appropriation Accounts (Nos. 0026555.578999.8902, 1176208.578999.8902 and 1516302.578999.8902).

EXHIBITS:

1.City Council Resolution No. 2024- , approving the first amendment to the agreement with PAR Western Line Contractors, LLC for design/build services for the City-Wide Electric Vehicle Charging Stations Project (CIP No. 8902)

2.First Amendment to agreement with PAR Western Line Contractors, LLC

3.Original Agreement with PAR Western Line Contractors, LLC 12/10/2024 C10 2 of 225

00029213 7
RESOLUTION NO. 2024-

A RESOLUTION OF THE CITY COUNCIL OF THE CHARTERED CITY OF

VISTA, CALIFORNIA, APPROVING THE FIRST AMENDMENT TO THE

AGREEMENT WITH PAR WESTERN LINE CONTRACTORS, LLC FOR

DESIGN/BUILD SERVICES FOR THE CITY-WIDE ELECTRIC VEHICLE CHARGING STATIONS PROJECT (CIP NO. 8902)
The City Council of the City of Vista does resolve as follows:

1. Findings. The City Council hereby finds and declares the following:

A. On June 25, 2024, the City entered into an agreement with PAR Western Line Contractors, LLC for design/build services for the City-Wide Electric Vehicle Charging Stations Project (CIP No. 8902).

B. The City now desires to amend the agreement with PAR Western Line Contractors, LLC to establish the Guaranteed Maximum Price of $3,839,304.

2. Action.

A. The First Amendment to the agreement between the City of Vista and PAR Western Line Contractors, LLC for design/build services for the City-Wide Electric Vehicle Charging Stations Project establishing the Guaranteed Maximum Price of $3,839,304 is approved and the Mayor is authorized to execute the amendment.

3. Adoption. PASSED AND ADOPTED at a meeting of the City Council of the City of Vista held on December 10, 2024, by the following vote:

AYES:

NOES:

ABSTAIN:

APPROVED AS TO FORM:

WALTER CHUNG, CITY ATTORNEY
By:

APPROVED
Walter C. Chung
20241126090031
JOHN B. FRANKLIN, MAYOR
ATTEST:

KATHY VALDEZ, CITY CLERK
By:
12/10/2024 C10 3 of 225
EXHIBIT 1

00098064 4

FIRST AMENDMENT TO THE CONTRACT BETWEEN THE CITY OF VISTA

AND PAR WESTERN LINE CONTRACTORS, LLC FOR DESIGN / BUILD SERVICES FOR THE CITY-WIDE EVSE PROJECT CIP NO. 8902
THIS FIRST AMENDMENT (“First Amendment”) to the Contract between the City of Vista and PAR Western Line Contractors, LLC, dated June 25, 2024 (“Contract”), is made and entered into as of _______________________ (“First Amendment Date”), by and between the City of Vista, a chartered municipal corporation (“City”), and PAR Western Line Contractors, LLC, a Delaware limited liability company (“Contractor”).

Recitals: City and Contractor now desire to enter into a First Amendment to the Contract by modifying the terms of the Contract.

NOW, THEREFORE, in consideration of these recitals and the mutual covenants contained herein, City and Contractor agree as follows:

1.The Guaranteed Maximum Price (GMP) for construction of the City-Wide EVSE Project (Phase II), is hereby established as $3,377,214, which is in addition to the $462,090 in preconstruction design services (Phase I), in accordance with Section 1.3 of the Contract. A breakdown of the GMP is included in Exhibit A.

2.The construction schedule is established and set forth in Exhibit B.

3.The City Engineer is directed to approve the 100% construction documents prior to Written Notice to Proceed with Construction Services pursuant to Vista Municipal Code Section 2.30.020.B

4.All other conditions of the Contract not specifically amended or superseded by the terms herein shall continue in full force and effect. [Text and signatures follow on page 2.]
12/10/2024 C10 4 of 225
EXHIBIT 2

Contract Amendment

Page 2 ends

00098064 44862-9422-8218, v. 2
IN WITNESS WHEREOF, the parties have executed and entered into this First Amendment as of the First Amendment Date.

CITY OF VISTA, a chartered municipal
corporation

By:

JOHN B. FRANKLIN, MAYOR

ATTEST:

KATHY VALDEZ, CITY CLERK

By:

APPROVED AS TO FORM:

WALTER CHUNG, CITY ATTORNEY

By:

RISK MANAGEMENT REVIEW:

DOLORES GASCON, RISK MANAGER

By:

APPROVED
Amanda L. Guy
20241114093939

PAR WESTERN LINE CONTRACTORS,
LLC, a Delaware limited liability corporation

By:

NAME/Title

By:

NAME/Title

12/10/2024 C10 5 of 225

Item #Description Quantity Unit Unit Price Total

CONSTRUCTION SERVICES - PHASE II

1.00 Final Design Details & Permitting 1 LS $134,700.00 $134,700.00

2.00 Electrical Switchgear/Service Panels 1 LS $677,996.00 $677,996.00

3.00 Conduit and Conductors 1 LS $350,050.00 $350,050.00

4.00 Trenching and/or Boring 1 LS $513,147.00 $513,147.00

5.00 Equipment Pads, Concrete or Paving 1 LS $860,328.00 $860,328.00

6.00 Bollards 1 LS $109,223.00 $109,223.00

7.00 Fencing and Gates 1 LS $0.00 $0.00

8.00 Striping and Signage 1 LS $48,550.00 $48,550.00

9.00 Miscellaneous, Balance of System 1 LS $12,000.00 $12,000.00

10.00 Commissioning 1 LS $104,500.00 $104,500.00

11.00 Labor, including coordination with City's selected charge management software (CMS) provider.1 LS $58,500.00 $58,500.00

12.00 Bonding & Insurance (included below)0 LS $0.00 $0.00

ALLOWANCE ITEMS
AL1 Redesign for Power Your Drive 1 LS $55,000.00 $55,000.00 AL2 LS $0.00 $0.00
AL3
AL4
CONSTRUCTION SERVICES PHASE II - SUBTOTAL $2,923,994.00 10% Cost of Work Fee $292,400.00
Total $3,216,394.00

1.00% Bond Costs $32,164.00
Total with Bond $3,248,558.00
5% Contingency $160,820.00
Total w/ Contingency $3,377,214.00
City of Vista Public and Fleet Charging Infrastructure - Rates & Fees Breakdown - GMP

EXHIBIT A
12/10/2024 C10 6 of 225

ID Task
Mode
Task Name Duration Start Finish Actual Finish % Complete 1 Phase 1 157.5 days Tue 6/18/24 Mon 2/3/25 NA 43%
2 Receive NTP 0 days Tue 6/18/24 Tue 6/18/24 Tue 6/18/24 100% 3 Receive Design Documents 3 days Mon 7/15/24 Wed 7/17/24 Wed 7/17/24 100% 4 Charger MFG Confirmed 0 days Mon 7/15/24 Mon 7/15/24 Mon 7/15/24 100% 5 DESIGN 137.5 days Tue 7/16/24 Mon 2/3/25 NA 48%
6 Charger Models Defined 8 days Tue 7/16/24 Thu 7/25/24 Thu 7/25/24 100% 7 CD30 Design Analysis 9 days Thu 7/18/24 Tue 7/30/24 Tue 7/30/24 100% 8 City of Vista - CD30 Design Page Turn 5 days Tue 7/30/24 Mon 8/5/24 Mon 8/5/24 100% 9 City of Vista - CD30 Design Plan Approved 0 days Mon 8/5/24 Mon 8/5/24 Mon 8/5/24 100% 10 Utility Coordination 105 days Wed 7/31/24 Thu 1/2/25 NA 34% 11 City of Vista - SDG&E Design Released 0 days Wed 7/31/24 Wed 7/31/24 Wed 7/31/24 100% 12 SDG&E Site Visits 5 days Mon 9/16/24 Fri 9/20/24 Fri 9/20/24 100% 13 SDG&E Load Requests Submitted 20 days Sat 8/3/24 Fri 9/6/24 Fri 9/6/24 100% 14 SDG&E Load Increases Approved 34 days Tue 9/3/24 Fri 10/18/24 NA 60% 15 SDG&E Utility Design Complete 21 wks Wed 7/31/24 Thu 1/2/25 NA 10% 16 Conceptual Design CD90 10 wks Tue 8/6/24 Tue 10/15/24 NA 90% 17 CD90 Designs Complete 0 days Tue 10/15/24 Tue 10/15/24 NA 0% 18 City of Vista - CD90 Design Review 3 wks Wed 10/16/24 Tue 11/5/24 NA 50% 19 City of Vista - CD90 Designs Approved 5 days Tue 10/22/24 Tue 11/12/24 NA 50% 20 Issue for Permit Design 10 days Wed 11/13/24 Fri 11/29/24 NA 0% 21 Issue for Construction 2 wks Mon 1/20/25 Mon 2/3/25 NA 0% 22 GMP 15 days Wed 10/16/24 Tue 11/5/24 NA 33%
23 Finalize GMP 10 days Wed 10/16/24 Tue 10/29/24 NA 50% 24 GMP Submitted 0 days Tue 10/29/24 Tue 10/29/24 NA 0% 25 City of Vista - GMP Review 1 wk Wed 10/30/24 Tue 11/5/24 NA 0% 26 City of Vista GMP Approved 0 days Tue 11/5/24 Tue 11/5/24 NA 0% 27 Permitting 32.5 days Mon 12/2/24 Mon 1/20/25 NA 0%
28 Permit Reviews 6.5 wks Mon 12/2/24 Mon 1/20/25 NA 0% 29 All Permits Obtained 0 days Mon 1/20/25 Mon 1/20/25 NA 0% 30 Phase 1 Design Complete 0 days Mon 2/3/25 Mon 2/3/25 NA 0% 31 Phase 2 390 days Wed 11/6/24 Wed 5/13/26 NA 0%
32 Phase 2 NTP 5 days Wed 11/6/24 Tue 11/12/24 NA 0%
33 Issue for Record 4 wks Wed 11/13/24 Fri 12/13/24 NA 0% 34 PROCUREMENT 100 days Wed 11/6/24 Wed 4/2/25 NA 0%
35 Blink LV2 Chargers 12 wks Wed 11/13/24 Wed 2/12/25 NA 0% 36 Blink LV3 Chargers 5 mons Wed 11/6/24 Wed 4/2/25 NA 0% 37 SWGR 13 wks Wed 11/13/24 Wed 2/19/25 NA 0%
38 Disconnects 6 wks Wed 11/13/24 Wed 1/1/25 NA 0%
39 Transformers 12 wks Wed 11/13/24 Wed 2/12/25 NA 0%
40 Control Cable 2 wks Wed 11/13/24 Fri 11/29/24 NA 0%
41 Precast Foundations 3 wks Wed 11/13/24 Fri 12/6/24 NA 0% 42 CONSTRUCTION 300 days Thu 3/20/25 Wed 5/13/26 NA 0%
43 Site 12: Shadow Ridge Park 4 wks Thu 3/20/25 Wed 4/16/25 NA 0% 44 Site 3: Wave Waterpark 10 wks Thu 4/3/25 Wed 6/11/25 NA 0% 45 Site 9: Breeze Hill Park 4 wks Thu 5/15/25 Wed 6/11/25 NA 0% 46 Site 11: Luz Duran Park 4 wks Thu 5/29/25 Wed 6/25/25 NA 0% 47 Site 8: Fire Station 6 4 wks Thu 6/12/25 Wed 7/9/25 NA 0% 48 Site 2: Civic Center 15 wks Thu 6/26/25 Wed 10/8/25 NA 0% 49 Site 6: Vista Sports Park 6 wks Thu 9/11/25 Wed 10/22/25 NA 0% 50 Site 1: Public Works 14 wks Thu 9/25/25 Wed 12/31/25 NA 0% 51 Site 5: Downtown 12 wks Thu 12/4/25 Wed 2/25/26 NA 0% 52 Site 4: Brengle Terrace Park 15 wks Thu 1/29/26 Wed 5/13/26 NA 0% 53 Commissioning 1 wk Thu 2/12/26 Wed 2/18/26 NA 0%
54 TTM Installation 12 wks Thu 11/27/25 Wed 2/18/26 NA 0% 55 Operational 0 days Wed 2/18/26 Wed 2/18/26 NA 0%
6/18
7/15
8/5
8/5
7/31
10/15
10/29
11/5
1/20
2/3
2/18

J J A S O N D J F M A M J J A S O N D J F M A M
2025 2026
Task
Split
Milestone
Summary
Project Summary
Inactive Task
Inactive Milestone
Inactive Summary
Manual Task
Duration-only
Manual Summary Rollup
Manual Summary
Start-only
Finish-only
External Tasks
External Milestone
Deadline
Progress
Manual Progress
City of Vista: Design-Build EV
Preliminary Schedule
PAR Western Line Contractors, LLC

Page 1 ends

Project: City of Vista - Citywise
Date: Tue 10/29/24

EXHIBIT B
12/10/2024 C10 7 of 225

12/10/2024 C10 8 of 225
EXHIBIT 3

12/10/2024 C10 9 of 225

12/10/2024 C10 10 of 225

12/10/2024 C10 11 of 225

12/10/2024 C10 12 of 225

12/10/2024 C10 13 of 225

12/10/2024 C10 14 of 225

12/10/2024 C10 15 of 225

12/10/2024 C10 16 of 225

12/10/2024 C10 17 of 225

12/10/2024 C10 18 of 225

12/10/2024 C10 19 of 225

12/10/2024 C10 20 of 225

12/10/2024 C10 21 of 225

12/10/2024 C10 22 of 225

12/10/2024 C10 23 of 225

12/10/2024 C10 24 of 225

12/10/2024 C10 25 of 225

12/10/2024 C10 26 of 225

12/10/2024 C10 27 of 225

12/10/2024 C10 28 of 225

12/10/2024 C10 29 of 225

12/10/2024 C10 30 of 225

12/10/2024 C10 31 of 225

12/10/2024 C10 32 of 225

12/10/2024 C10 33 of 225

12/10/2024 C10 34 of 225

12/10/2024 C10 35 of 225

12/10/2024 C10 36 of 225

12/10/2024 C10 37 of 225

12/10/2024 C10 38 of 225

12/10/2024 C10 39 of 225

12/10/2024 C10 40 of 225

12/10/2024 C10 41 of 225

12/10/2024 C10 42 of 225

12/10/2024 C10 43 of 225

12/10/2024 C10 44 of 225

12/10/2024 C10 45 of 225

12/10/2024 C10 46 of 225

12/10/2024 C10 47 of 225

12/10/2024 C10 48 of 225

12/10/2024 C10 49 of 225

12/10/2024 C10 50 of 225

12/10/2024 C10 51 of 225

12/10/2024 C10 52 of 225

12/10/2024 C10 53 of 225

12/10/2024 C10 54 of 225

12/10/2024 C10 55 of 225

12/10/2024 C10 56 of 225

12/10/2024 C10 57 of 225

12/10/2024 C10 58 of 225

12/10/2024 C10 59 of 225

12/10/2024 C10 60 of 225

12/10/2024 C10 61 of 225

12/10/2024 C10 62 of 225

12/10/2024 C10 63 of 225

12/10/2024 C10 64 of 225

12/10/2024 C10 65 of 225

12/10/2024 C10 66 of 225

12/10/2024 C10 67 of 225

12/10/2024 C10 68 of 225

12/10/2024 C10 69 of 225

12/10/2024 C10 70 of 225

12/10/2024 C10 71 of 225

12/10/2024 C10 72 of 225

12/10/2024 C10 73 of 225

12/10/2024 C10 74 of 225

12/10/2024 C10 75 of 225

12/10/2024 C10 76 of 225

12/10/2024 C10 77 of 225

12/10/2024 C10 78 of 225

12/10/2024 C10 79 of 225

12/10/2024 C10 80 of 225

12/10/2024 C10 81 of 225

12/10/2024 C10 82 of 225

12/10/2024 C10 83 of 225

12/10/2024 C10 84 of 225

12/10/2024 C10 85 of 225

12/10/2024 C10 86 of 225

12/10/2024 C10 87 of 225

12/10/2024 C10 88 of 225

12/10/2024 C10 89 of 225

12/10/2024 C10 90 of 225

12/10/2024 C10 91 of 225

12/10/2024 C10 92 of 225

12/10/2024 C10 93 of 225

12/10/2024 C10 94 of 225

12/10/2024 C10 95 of 225

12/10/2024 C10 96 of 225

12/10/2024 C10 97 of 225

12/10/2024 C10 98 of 225

12/10/2024 C10 99 of 225

12/10/2024 C10 100 of 225

12/10/2024 C10 101 of 225

12/10/2024 C10 102 of 225

12/10/2024 C10 103 of 225

12/10/2024 C10 104 of 225

12/10/2024 C10 105 of 225

12/10/2024 C10 106 of 225

12/10/2024 C10 107 of 225

12/10/2024 C10 108 of 225

12/10/2024 C10 109 of 225

12/10/2024 C10 110 of 225

12/10/2024 C10 111 of 225

12/10/2024 C10 112 of 225

12/10/2024 C10 113 of 225

12/10/2024 C10 114 of 225

12/10/2024 C10 115 of 225

12/10/2024 C10 116 of 225

12/10/2024 C10 117 of 225

12/10/2024 C10 118 of 225

12/10/2024 C10 119 of 225

12/10/2024 C10 120 of 225

12/10/2024 C10 121 of 225

12/10/2024 C10 122 of 225

12/10/2024 C10 123 of 225

12/10/2024 C10 124 of 225

12/10/2024 C10 125 of 225

12/10/2024 C10 126 of 225

12/10/2024 C10 127 of 225

12/10/2024 C10 128 of 225

12/10/2024 C10 129 of 225

12/10/2024 C10 130 of 225

12/10/2024 C10 131 of 225

12/10/2024 C10 132 of 225

12/10/2024 C10 133 of 225

12/10/2024 C10 134 of 225

12/10/2024 C10 135 of 225

12/10/2024 C10 136 of 225

12/10/2024 C10 137 of 225

12/10/2024 C10 138 of 225

12/10/2024 C10 139 of 225

12/10/2024 C10 140 of 225

12/10/2024 C10 141 of 225

12/10/2024 C10 142 of 225

12/10/2024 C10 143 of 225

12/10/2024 C10 144 of 225

12/10/2024 C10 145 of 225

12/10/2024 C10 146 of 225

12/10/2024 C10 147 of 225

12/10/2024 C10 148 of 225

12/10/2024 C10 149 of 225

12/10/2024 C10 150 of 225

12/10/2024 C10 151 of 225

12/10/2024 C10 152 of 225

12/10/2024 C10 153 of 225

12/10/2024 C10 154 of 225

12/10/2024 C10 155 of 225

12/10/2024 C10 156 of 225

12/10/2024 C10 157 of 225

12/10/2024 C10 158 of 225

12/10/2024 C10 159 of 225

12/10/2024 C10 160 of 225

12/10/2024 C10 161 of 225

12/10/2024 C10 162 of 225

12/10/2024 C10 163 of 225

12/10/2024 C10 164 of 225

12/10/2024 C10 165 of 225

12/10/2024 C10 166 of 225

12/10/2024 C10 167 of 225

12/10/2024 C10 168 of 225

12/10/2024 C10 169 of 225

12/10/2024 C10 170 of 225

12/10/2024 C10 171 of 225

12/10/2024 C10 172 of 225

12/10/2024 C10 173 of 225

12/10/2024 C10 174 of 225

12/10/2024 C10 175 of 225

12/10/2024 C10 176 of 225

12/10/2024 C10 177 of 225

12/10/2024 C10 178 of 225

12/10/2024 C10 179 of 225

12/10/2024 C10 180 of 225

12/10/2024 C10 181 of 225

12/10/2024 C10 182 of 225

12/10/2024 C10 183 of 225

12/10/2024 C10 184 of 225

12/10/2024 C10 185 of 225

12/10/2024 C10 186 of 225

12/10/2024 C10 187 of 225

12/10/2024 C10 188 of 225

12/10/2024 C10 189 of 225

12/10/2024 C10 190 of 225

12/10/2024 C10 191 of 225

12/10/2024 C10 192 of 225

12/10/2024 C10 193 of 225

12/10/2024 C10 194 of 225

12/10/2024 C10 195 of 225

12/10/2024 C10 196 of 225

12/10/2024 C10 197 of 225

12/10/2024 C10 198 of 225

12/10/2024 C10 199 of 225

12/10/2024 C10 200 of 225

12/10/2024 C10 201 of 225

12/10/2024 C10 202 of 225

12/10/2024 C10 203 of 225

12/10/2024 C10 204 of 225

12/10/2024 C10 205 of 225

12/10/2024 C10 206 of 225

12/10/2024 C10 207 of 225

12/10/2024 C10 208 of 225

12/10/2024 C10 209 of 225

12/10/2024 C10 210 of 225

12/10/2024 C10 211 of 225

12/10/2024 C10 212 of 225

12/10/2024 C10 213 of 225

12/10/2024 C10 214 of 225

12/10/2024 C10 215 of 225

12/10/2024 C10 216 of 225

12/10/2024 C10 217 of 225

12/10/2024 C10 218 of 225

12/10/2024 C10 219 of 225

12/10/2024 C10 220 of 225

12/10/2024 C10 221 of 225

12/10/2024 C10 222 of 225

12/10/2024 C10 223 of 225

12/10/2024 C10 224 of 225

12/10/2024 C10 225 of 225

← All documents from this meeting