bsd 2025 AR 06/24 cip 8131 change order buena outfall force main
Meeting
June 24, 2025
Body
Vista City Council
Pages
22
Original file
857 KB
Text extracted from the city's file for reading and search. Open the original on portal.laserfiche.com. That file is the official record.

ACTION:
____________________________

Clerk/Secretary
Department: Engineering Item No: C10
Prepared by:

Erin Adams, Administrative Programs Manager
Ken Knatz, Sewer Engineering Division Manager Meeting Date: June 24, 2025 Approved by:

Greg Mayer, Department Director
John Conley, City Manager Agenda Location: Consent Calendar S
UBJECT: CIP NO. 8131 – EMERGENCY MODIFICATIONS - BUENA OUTFALL FORCE MAIN PHASE III PROJECT – CONSTRUCTION CHANGE ORDER NO. 1
RE
COMMENDATION: Adopt Buena Sanitation District Resolution No. 2025- , approving Construction Change Order No. 1 to the contract with Dick Miller, Inc. for the Emergency Modifications - Buena Outfall Force Main Phase III Project (CIP No. 8131).

CO
RRELATION TO CITY COUNCIL GOALS: Routine operational item not directly corresponding to a specific City Council goal.

P
RIOR ACTION: On June 11, 2024, adopted Buena Sanitation District Resolution No. 2024-04, adopting a Capital Project Budget for Fiscal Years 2024/25 and 2025/26 (Vote: 5-0).

O
n June 25, 2024, adopted Buena Sanitation District Resolution No. 2024-08, awarding a construction contract to Dick Miller, Inc. for the Emergency Modifications – Buena Outfall Force Main Phase III Project (CIP No. 8131) (Vote: 4-0, Green absent).

S
TATEMENT ON THE SUBJECT: The Buena Outfall Force Main was constructed to replace a parallel outfall facility that conveys flow to the Encina Wastewater Authority. The pipeline did not function properly upon initial commissioning and is undergoing modifications to operate as originally intended.

C
hange Order No. 1 to the Construction Contract: This construction change order addresses the modifications contract force main pressurization scope of work. The project includes 16 locations to be converted from gravity flow to pressure flow along the 4-mile pipeline alignment. The work was originally specified to be conducted within the existing manholes to minimize construction impacts and eliminate costly reconstruction of the roadway. The contractor experienced numerous difficulties at the first location due to the constrained environment which has delayed the completion of the work. Staff recommends conducting open excavations to remove the manholes and install the mechanical pipeline closures to expedite the work and final commissioning of this critical pipeline.

F
ISCAL IMPACT: The cost of this change order is $980,284.96 for a new contract ceiling of $3,230,550.96. Approval of this staff recommendation will also amend the Capital Project Budget for Fiscal Years 2024/25 and 2025/26 by appropriating $753,000 from Buena funds to CIP 8131 to cover the cost of the change order and any other unforeseen costs.

AGENDA
REPORT

CITY COUNCIL

COMMUNITY DEVELOPMENT COMMISSION

SUCCESSOR AGENCY

BUENA SANITATION DISTRICT

JOINT POWERS FINANCING AUTHORITY
06/24/2025
C10
1 of 352
MEETING DATE: June 24, 2025 PAGE 2
SUBJECT: CIP NO. 8131 – EMERGENCY MODIFICATIONS - BUENA OUTFALL FORCE MAIN PHASE III PROJECT – CONSTRUCTION CHANGE ORDER NO. 1
EXHIBITS:

1. Buena Sanitation District Resolution 2025- , approving Construction Change Order No. 1 to the c
ontract with Dick Miller, Inc. for the for the Emergency Modifications - Buena Outfall Force Main P
hase III Project (CIP No. 8131)

2. Buena Sanitation District Resolution 2025- , amending the Capital Project Budget for Fiscal Years 2024/25 and 2025/26

3. Change Order No. 1

4. Original Contract with Dick Miller, Inc.
06/24/2025
C10
2 of 352
00056393 5
RESOLUTION NO. 2025-

A RESOLUTION OF THE BOARD OF DIRECTORS OF THE

BUENA SANITATION DISTRICT, APPROVING CONSTRUCTION CHANGE ORDER NO. 1 TO THE CONTRACT WITH DICK MILLER, INC. FOR THE EMERGENCY MODIFICATIONS – BUENA OUTFALL FORCE MAIN PHASE III PROJECT (CIP NO. 8131)
The Board of Directors of the Buena Sanitation District does resolve as follows:

1. Findings. The Board of Directors hereby finds and declares the following:

A. On June 25, 2024, the District awarded a construction contract to Dick Miller, Inc. for the Emergency Modification – Buena Outfall Force Main Phase III Project (CIP No. 8131).

B. The District now desires to amend the contract to address the modifications contract force main pressurization scope of work.

2. Action.

A. Construction Change Order No. 1 to the contract with Dick Miller, Inc. for the Emergency Modifications – Buena Outfall Force Main Phase III is approved, and the Chairperson is authorized to execute the change order.

3. Adoption. PASSED AND ADOPTED at a meeting of the Board of Directors of the Buena Sanitation District held on June 24, 2025, by the following vote:

AYES:

NOES:

ABSTAIN:

APPROVED AS TO FORM:

WALTER CHUNG, DISTRICT COUNSEL
By:

APPROVED
Walter C. Chung
20250610113303
JOHN B. FRANKLIN, CHAIRPERSON
ATTEST:

KATHY VALDEZ, CLERK OF THE BOARD
By:
06/24/2025
C10
3 of 352
EXHIBIT 1
00056393 5
RESOLUTION NO. 2025-

A RESOLUTION OF THE BOARD OF DIRECTORS OF THE

BUENA SANITATION DISTRICT, AMENDING THE CAPITAL PROJECT BUDGET FOR FISCAL YEARS 2024/25 AND 2025/26
The Board of Directors of the Buena Sanitation District does resolve as follows:

1. Findings. The Board of Directors hereby finds and declares the following:

A. On June 11, 2024, the Board of Directors adopted Resolution 2024-04, approving the Six-Year Capital Improvement Program, the Capital Project Budget for Fiscal Years 2024/25 AND 2025/26, and authorizing appropriations for Fiscal Years 2024/25 and 2025/26 capital projects.

B. The Board of Directors desires to amend the Capital Project Budget at this time to reflect changed circumstances.

2. Action.

A. The Capital Project Budget Fiscal Years 2024/25 and 2025/26 is amended as set forth in Exhibit A.

3. Adoption. PASSED AND ADOPTED at a meeting of the Board of Directors of the Buena Sanitation District held on June 24, 2025, by the following vote:

AYES:

NOES:

ABSTAIN:

APPROVED AS TO FORM:

WALTER CHUNG, DISTRICT COUNSEL
By:

JOHN FRANKLIN, CHAIRPERSON
ATTEST:

KATHY VALDEZ, CLERK OF THE BOARD
By:

APPROVED
Walter C. Chung
20240917152228
06/24/2025
C10
4 of 352
EXHIBIT 2
RESOLUTION NO. 2025-

BUENA SANITATION DISTRICT BOARD OF DIRECTORS
PAGE 1

EXHIBIT A

1. Account Number Account Description Increase Decrease 5060000.310410 Fund Balance 753,000$
5066515.578999.8131 Source Appropriation 753,000$
Appropriations are hereby made to fund Emergency Modifications - Buena Outfall Force Main Project - Construction Change Order No. 1.
06/24/2025
C10
5 of 352

200 Civic Center Drive ● Vista, California 92084-6240 ● 760-726-1340 CHA
NGE ORDER NO: 01 [CIP 8131]
PROJECT: Emergency Modifications-Buena Outfall Phase III Modifications CONTRACTOR: DMI Inc.

CONSTRUCTION MGR: Ken Knatz
Contractor is hereby directed by the City of Vista to make the following changes to the plans and specifications or do the following described work not included in the plans and specifications.

1. During construction, it was determined that the required work to install an electrofusi on c
oupling on the existing pipeline within the existing manhole along with victaulic couplings for the HDPE spool was not possible due to severe space limitations that were not antici pated dur
ing design. Therefore, each of the 16 existing manholes will require complete removal to install the closure pipe, backfill and finish paving. A credit is for the original contract work that is not being performed. The cost of this work is $980,284.96. 223 working days are added to the contract. See PCO #1 for details.

It i
s agreed that the full and final compensation for this work shall result in a final contract increase in the amount of $980,284.96.

R
eference is made to the Contract Documents with specific reference to Section 6-7.1 of the Supplementary General Provisions.

Total
additional cost associated with this Change Order is $980,284.96 Thi
s change order is not valid until signed by both the owner and the contractor. Signature of the contractor indicates his agreement herewith, for full compensation including mark-ups and extended overhead to the contract sum and adjustments to contract time. By executing this change order, the contractor agrees that no additional compensation or claims for items of work listed in this change order will be allowed. Any attempt to change this form by transmittals or other means shall render this change order void.

Docusign Envelope ID: 1F2A2CFF-903B-4057-983E-395FD3EBE00E 06/24/2025
C10
6 of 352
EXHIBIT 3

Page 2 ends

CHANGE ORDER NO: _01__ [CIP 8131]
PROJECT: Emergency Modifications-Buena Outfall Phase III Modifications

200 Civic Center Drive ● Vista, California 92084-6240 ● 760-726-1340

ACCEPTED BY CONTRACTOR:

Name Title Signature Date

RECOMMENDED BY CONSTRUCTION MANAGER:

Name Title Signature Date

APPROVED BY CITY ENGINEER:

Name Title Signature Date

APPROVED BY CITY MANAGER:

Name Title Signature Date

ORIGINAL CONTRACT SUM: $2,250,266.00
SUM OF PREVIOUSLY AUTHORIZED CHANGE ORDERS: $0.00
SUBTOTAL: $2,250,266.00
AMOUNT OF THIS CHANGE ORDER $980,284.96
NEW CONTRACT SUM: $3,230,550.96

ORIGINAL CONTRACT TIME: (WORKING DAYS) 100
ADJUSTED CONTRACT TIME PRIOR TO THIS CHANGE ORDER: 0
CONTRACT TIME WILL BE INCREASED BY: 223
NEW CONTRACT TIME (WORKING DAYS): 323
Docusign Envelope ID: 1F2A2CFF-903B-4057-983E-395FD3EBE00E June 4, 2025Esteban Montoya Project Manager
Sewer Eng. Mgr.Ken Knatz June 4, 2025
June 4, 2025CIty EngineerGreg Mayer
06/24/2025
C10
7 of 352
DocuSign Envelope ID: 21D16CDF- 89F1- 45E6- 9BOB- 78B4B4C6CABD

CONSTRUCTION CONTRACT
THIS CONTRACT is made and entered into as of sU- ne-
Agreement Date"), by and between the Buena Sanitation District, a County Sanitation District (" Agency"), and Dick Miller, Inc., a California corporation (" Contractor'). District and Contractor are sometimes individually referred to as a "Party" and collectively as "Parties." In consideration of the mutual covenants contained herein, Agency and Contractor agree as follows:

SECTION 1
The Contract Documents consisting of the PROJECT SPECIFICATIONS, comprised of the NOTICE INVITING BIDS, the INSTRUCTIONS TO BIDDERS, the accepted BID PROPOSAL; BID SCHEDULE; CONTRACTOR' S LICENSING STATEMENT; PROJECT REFERENCES; CONTRACTOR' S LIST OF SUBCONTRACTORS;; PUBLIC CONTRACT CODE STATEMENTS AND QUESTIONNAIRE; NON - COLLUSION AFFIDAVITS; the CONSTRUCTION CONTRACT,

CONTRACTOR' S CERTIFICATE, SUPPLEMENTARY GENERAL PROVISIONS, SUPPLEMENTARY TECHNICAL PROVISIONS, Special Provisions, Plans, Standard Plans and Specifications; together with all additions, deletions, modifications, appendices, and all addenda ( N/A), as prepared prior to the date of bid opening setting forth any modifications or interpretations of any said documents, are hereby incorporated in and made a part of this Contract as fully as if set forth herein.

SECTION 2
For and in consideration of the payments and agreements to be made and performed by the Agency as set forth in said Contract Documents, the Contractor agrees with the Agency to construct

BUENA OUTFALL FORCEMAIN PHASE III PROJECT
as specifically set forth in documents entitled

EMERGENCY MODIFICATIONS - BUENA OUTFALL FORCEMAIN PHASE III MODIFICATIONS ( CIP NO. 8131)
for which award of the Contract was made, to furnish at his own proper cost and expense all plant, labor, services, materials, tools, equipment, supplies, transportation, utilities and all other items and facilities necessary therefore, as provided in the Contract Documents, and to do everything required therein. In accordance with the provisions of Section 3700 of the Labor Code, the Contractor will be required to secure the payment of Worker' s Compensation Insurance for its employees.

SECTION 3
For furnishing all said services and materials, payment of premiums on insurance policies, obtaining all permits and licenses of a temporary nature, furnishing and removing all plant, temporary work or structures, tools, and equipment, and for doing all the Work contemplated and embraced in this Contract, also for all loss and damage arising out of the nature of the SUMMARY CONSTRUCTION — BSD LOCAL Page 1 of 3 DICK MILLER, INC. 00064030-110006403014888- 8192- 7108, v. 2
06/24/2025
C10
8 of 352
EXHIBIT 4
aforesaid work during its progress or prior to acceptance from the action of the elements and from any unforeseen difficulties which may arise or be encountered in the prosecution of the Work, and for all other risks of any description connected with the Work, also for all expenses incurred by or in consequence of the suspension or discontinuance of work, except such as in the said Contract Documents are expressly stipulated to be borne by the Agency, and for well and faithfully completing the Work and the whole thereof within the stipulated time and in the manner shown and described in the said documents, and in accordance with the requirements of the Engineer under them, the Agency will pay, and the Contractor shall receive in full compensation therefore, the prices set forth by him in the accepted bid. The total compensation will be computed on the basis of the units of work actually performed in accordance with the requirements of the Contract Documents and paid for at the stipulated prices named in the BID SCHEDULE for completion of the Work.

SECTION 4
The Agency hereby promises and agrees with the said Contractor to employ, and does hereby employ the said Contractor to provide the materials and to do the Work according to the terms and conditions herein contained and referred to, for the price aforesaid, and hereby contracts to pay the same at the time, in the manner, and upon the conditions set forth in the Contract Documents, and the Parties for themselves, their heirs, executors, administrators, successors and assigns do hereby agree to the full performance of the covenants herein contained.

SECTION 5
Contractor agrees to indemnify, defend, and save harmless, the Agency, its officers, agents, employees and volunteers from and against any and all claims, demands, damages, losses and expenses, defense costs including attorney fees, or liability of any kind or nature which the Agency, its officers, agents and employees may sustain or incur or which may be imposed upon them for injury to or death of persons, or damage to property as a result of, arising out of, or in any manner connected with the Contractor' s performance under the terms of this Contract, caused in whole or in part by any negligent or willful acts or omission of the Contractor, any subcontractor, anyone directly or indirectly employed by any of them or anyone for whose acts any of them may be liable, except where caused by the active negligence, sole negligence, or willful misconduct of the Agency.

Continued on page 3.]
SUMMARY CONSTRUCTION - BSD LOCAL Page 2 of 3 DICK MILLER, INC. 00064030- 1100064030 14888- 8192- 7108, v. 2
06/24/2025
C10
9 of 352
DocuSign Envelope ID: 21D16CDF- 89F1- 45E6- 9B0B- 78B4B4C6CABD SECTION 6
Contractor agrees that the Payment Bond and Performance Bond attached to/ submitted concurrentlywith this Contractarefor referencepurposesonly, and shallnot be considereda partof this Contract. Contractorfurtheragreesthat said bondsare separateobligationsof the Contractor and its surety, and that any attorneys' fee provision contained in any payment bond or performancebond shall not applyto this Contract. In the eventthere is any litigationbetween the Partiesarisingfrom the breachof this Contract, each Partywill bearits own attorneys' fees in the litigation.

IN WITNESS WHEREOF, the Parties have caused this Agreement to be executed as of the Agreement Date.

BUENA SANITATION DISTRICT, a County
Sanitation Distriah f
By.-
JOHN B. FFIANKLIN, CHAIRPERSON
ATTEST:

KATHY VALDEZ, CLERK OF THE BOARD
By:

APPROVED AS TO FORM:

WA
W'
1,
RQJ4W, DISTRICTCOUNSEL
Balkp
y:

RISK
MANAGEMENTREVIEW: DOLORES
GASCON, RISK MANAGERrCaGv5:
6 f By
k 0t° rs,Gascew

APPROVED
Amanda
L. Guy20240531091725
DICK
MILLER, INC., a Californiacoo
xngned by: By:
64ut-
A,. M Esteban
Montoya Project Manager Na
J By:

1. ALnedby:
i
cInGlen
Bullock Name/
Title President

SUMMARY
CONSTRUCTION — BSD LOCAL Page 3 of 3 DICK MILLER, INC. 00064030- 1] 0006403014888- 8192- 7108, v. 2
06/24/2025
C10
10 of 352
V

CITY OF VISTA

CITY OF VISTA ENGINEERING DEPARTMENT

PROJECT SPECIFICATIONS FOR

EMERGENCY MODIFICATIONS - BUENA OUTFALL

PHASE III MODIFICATIONS
C. I. P. No. 8131
Dwg. No. 4505
March 2024
06/24/2025
C10
11 of 352

PROJECT SPECIFICATIONS
for

EMERGENCY MODIFICATIONS - BUENA OUTFALL

FORCEMAIN PHASE III PROJECT
Greg Mayer, P.E.

Director of Engineering
C. I. P. No. 8131

CITY OF VISTA, CALIFORNIA
Prepared in the

OFFICE OF THE CITY ENGINEER

CITY OF VISTA, CALIFORNIA

ENGINEERING DEPARTMENT
200 Civic Center Drive
Vista, CA 92084- 6275
Date Signed
1 06/24/2025
C10
12 of 352

PROJECT SPECIFICATIONS FOR
EMERGENCY MODIFICATIONS - BUENA OUTFALL FORCEMAIN PHASE III PROJECT ( C. I. P. No. 8131)

TABLE OF CONTENTS

BIDDING AND CONTRACTUAL DOCUMENTS PAG ES
NoticeInviting Bids................................................................................................. 3- 5 Instructions to Bidders........................................................................................... 6- 21 Proposal Forms
BidProposal............................................................................................... 22- 25 BidSchedule.............................................................................................. 26- 30 Contractor' s Licensing Statement............................................................ 31- 32 Project References..................................................................................... 33- 34 Contractor' s List of Subcontractors.......................................................... 35- 36 Non - Collusion Declaration......................................................................... 37 BidSecurity Forms..................................................................................... 38- 40 Agreement and Bonds
Construction Contract................................................................................ 41- 43 Faithful Performance Bond....................................................................... 44- 45 PaymentBond............................................................................................ 46- 47 Contractor' s Certificate.............................................................................. 48 Non - Collusion Declaration for Subcontractors......................................... 49

SPECIAL PROVISIONS
Supplementary General Provisions........................................................................ 50- 160

APPENDICES
Standards are incorporated and made part of the specifications by reference.

Appendix A: Terra Costa Consulting Group, Inc. Geotechnical Report Appendix B: Greenbook Standard Specifications for Public Works Construction San Diego Greenbook Supplement
Appendix C: City of Vista Standard Drawings
Appendix D: City of Carlsbad Standard Drawings
Appendix E: San Diego Regional Standard Drawings
RAI
06/24/2025
C10
13 of 352
PART I

BIDDING AND CONTRACTUAL DOCUMENTS

NOTICE INVITING BIDS
PUBLIC NOTICE IS HEREBY GIVEN that sealed bids will be received by the City Clerk of the chartered City of Vista (" Agency") for furnishing all plant, labor, services, materials, tools, equipment, supplies, transportation, utilities and all other items and facilities necessary therefore, as provided in the Contract Documents, for the " EMERGENCY MODIFICATIONS - BUENA OUTFALL FORCEMAIN PHASE III PROJECT ( C. I. P. No. 8131)" in strict accordance with the Project Specifications and Plans on file in the City of Vista Engineering Department.

1. DATE OF OPENING BIDS
All Bidders are required to submit their bid electronically through the City' s Electronic Bidding System ( OpenGov). Hardcopy bids will not be accepted. Bidders must register by creating a free account with OpenGov at: https:// procurement. opengov. com/ signup.

Registered bidders may obtain bid materials and view submission procedures at:
https: Hsecure. opengov. com/ portal/ vista- ca. Bidders must also download this bid solicitation to appear on the Bidder' s List as a " Prospective Bidder," receive addenda, and submit a bid. Bids shall be submitted electronically no later than 2:00 PM on Thursday, April 18, 2024.

Immediately after the bid submission deadline, bids will be unsealed and posted at:
https: Hsecure. opengov. com/ portal/ vista- ca. OpenGov will determine the official time for the advertised bid opening and such determination will be final. Bid Tabulation results will be available through OpenGov.

Any bids not received in a timely manner on the Bid Opening Date, as described above, will not be considered.

Note: The City of Vista complies with the Americas with Disabilities Act. If you require reasonable accommodations for the bid opening, please contact the Office of the City Clerk, 760- 639- 6125, at least forty-eight (48) hours prior to the bid opening.

2. DESCRIPTION OF WORK
The Work generally consists of: Installation of appurtenances to an existing wastewater pipeline along Palomar Airport Road between Paseo Del Norte and El Camino Real. The project will relocate five existing air vacuum relief valves from within manholes in center westbound lane of to above ground locations. The work includes modifications to raise three ( 3) air vacuum valves to and construct dual air vacuum assemblies at grade, and two ( 2) modifications to raise single air vacuum valves with reconstruction at grade, with one new addition of a dual air vacuum valve to grade by way of modification within an existing gravity manhole with improvements to couple and construct a continuous pressurized pipeline segment, and one new single air vacuum valve in a unimproved easement area northeast of Palomar Airport Road and El Camino Real. The 3 06/24/2025
C10
14 of 352
work also includes modifications to convert fifteen ( 15) gravity pipeline segments within manholes to segments of continuous pressure pipeline at various locations along the alignment and includes mechanical and electrical improvements to protect two existing Odor Control Units from flooding when the system experiences higher flows in winter wet weather periods. The construction includes but is not limited to the above noted improvements in addition to asphalt and portland cement concrete removals, trenching, excavation, over -excavation, backfilling and compaction, pipeline modifications, mechanical piping, appurtenance installation, construction of electrical systems, restoration of existing surface improvements, irrigation, and erosion control and BMPs. An existing pipeline is available for bypassing the full flow during the project construction and no flow diversions or bypass pumping is required by the contractor to execute the work.

3. LOCATION OF WORK
The Work to be constructed is located on: Palomar Airport Road between Paseo Del Norte and El Camino Real in the City of Carlsbad, California.

4. CONTRACT DOCUMENTS
Contract documents are available electronically on the City' s OpenGov portal at:
https: Hsecure. opengov. com/ portal/ vista- ca.

5. CONTRACTOR' S LICENSE CLASSIFICATION
In accordance with the provisions of the California Public Contract Code Section 3300, the Agency has determined that the Contractor shall be required to possess a valid California Class A General Engineering Contractor License at the time that the Contract is awarded, and shall maintain said license( s) in good standing at all times during performance of the Work.

6. CONSTRUCTION COST OPINION AND TIME OF COMPLETION
The Engineer' s Opinion of Probable Construction Cost for this Project is One Million Five Hundred Thousand Dollars ($ 1, 500, 000) for the base bid items. All Work shall be completed in every detail to the satisfaction of the Agency within One Hundred ( 100) Working Days after the date of the NOTICE TO PROCEED.

7. PRE - BID MEETING
A Pre -Bid Meeting will be held on WEDNESDAY, April 3, 2024, AT 1:00 PM in the Delpy Conference Room located on the first floor of the City of Vista Civic Center, 200 Civic Center Drive, Vista, CA 92084- 6275 ( visitors must check in the lobby of City Hall). The scope of the Project and the bidding requirements are reviewed by the Agency and comments and questions from prospective bidders are discussed. PROSPECTIVE BIDDERS ARE ENCOURAGED TO ATTEND.
4 06/24/2025
C10
15 of 352

8. PROJECT ADMINISTRATION
All project related questions and requests for clarifications, changes, exceptions, and deviations to the terms and conditions set forth in this solicitation shall be submitted via Q& A" through the City' s Electronic Bidding System, OpenGov.

All questions must be submitted through the City' s Electronic Bidding System by the deadline listed in the City' s Electronic Bidding System, or if no deadline is listed, at least five ( 5) Working Days prior to the date fixed for opening of bids.

9. CITY CHARTER / WAGES
NOTICE IS HEREBY GIVEN that, pursuant to the Vista City Charter and the Vista Municipal Code, payment of prevailing wages and compliance with the California Labor Code Sections 1770 et seq IS required for this Project.

By ORDER of the chartered City of Vista, California
Kathy Valdez, City Clerk
City of Vista, California
7 06/24/2025
C10
16 of 352

INSTRUCTIONS TO BIDDERS

1. SITE REVIEW
Prospective bidders are expected to conduct a site review of the Project prior to submitting a bid.

2. LOCAL CONDITIONS AND BID QUANTITIES
Bidders shall read the Project Specifications and documents, examine the Plans, review available documents, and make their own estimates of the existing facilities and the difficulties that will attend the execution of the Work called for by the proposed Contract including federal, state, and local laws and regulations, local conditions, uncertainty of weather, traffic, soil conditions and all other contingencies.

Bidders shall satisfy themselves by personal examination of the location of the proposed Work, and by such other means as they may choose as to actual conditions and requirements, and as to the accuracy of the quantities stated in the BID SCHEDULE. The submission of a bid shall be conclusive evidence that the bidder has investigated and is satisfied as to the conditions to be encountered, as to the character, quality, and scope of work to be performed, as to the quantity of materials to be furnished, and as to the requirements of these Contract Documents.

Information derived from the Plans, Project Specifications, profiles or drawings, maps, other reports, or from the Engineer or his assistants, shall not relieve the bidder of this responsibility, and the interpretation of the data disclosed by borings or other preliminary investigations is not warranted or guaranteed, either expressly or implied, by the Agency. The bidder' s failure or omission to receive or examine any part of the Contract Documents or to visit the site and be familiar with the existing conditions, shall in no way relieve the bidder from obligation with respect to this bid or to the performance of the Work under this Contract.

The quantities of work or material stated in the unit price items of the BID SCHEDULE are supplied only to give an indication of the general scope of the Work. The Agency does not expressly or by implication agree that the actual amount of work or material will correspond therewith, but reserves the right to increase or decrease the amount of any unit price item of the Work by an amount up to and including twenty- five percent ( 25%) of any bid item( s), or to omit portions of such work as may be deemed necessary or expedient by the Engineer without a change in the unit price.

Bidders shall not, at anytime after the submission of a bid, make or have any claim for damages or anticipated profits or loss of profit or otherwise because of any difference between the quantities of work actually done and material furnished and those stated in said unit price items of the BID SCHEDULE.

The Bidder understands that the unit prices and total bid amount set forth by the Bidder in the BID SCHEDULE shall include all appurtenant expenses, premiums, taxes, royalties and fees. The Bidder shall make no reference in the BID SCHEDULE to sales tax, use tax, or any other tax. The Bidder shall make no reference in the BID SCHEDULE to any patent fees or royalties on any patented article or process which may be furnished or used or to any premium for insurance or 0 06/24/2025
C10
17 of 352
surety bonds in the Bid. All amounts bid shall be deemed and held to include any such taxes, fees, royalties or premiums which may be applicable.

The Contractor shall pay all license fees and royalties and assume all costs incident to the use in the performance of the Work or the incorporation in the Work of any invention, design, process, project, or device which is the subject of patent rights or copyrights held by others.

The Contractor shall pay all sales, consumer, use and other similar taxes for the Work or portions thereof provided by the Contractor which are legally enacted at the time bids are received by the Agency, whether or not yet effective. The total bid amount shall be deemed to include such taxes and the Contractor shall not be entitled to separate compensation for such taxes.

3. INTERPRETATION OF PLANS AND PROJECT SPECIFICATIONS
If any person contemplating the submittal of a bid for the proposed Contract is in doubt as to the meaning of any requirement of the Plans or Project Specifications, or he finds any discrepancies in or omissions from the Plans or Project Specifications, they shall submit a written request for an interpretation or correction thereof via " Q&A" through the City' s Electronic Bidding System, OpenGov.

The written request must be received by the deadline listed in the City' s Electronic Bidding System, or if no deadline is listed, at least five (5) Working Days prior to the date fixed for opening of bids. The person making the request will be responsible for its prompt delivery.

Interpretations or corrections will be made only by ADDENDA to the Project Specifications or by dated revisions of the drawings. Addenda will be sent to registered bidders that have downloaded this solicitation through the City' s Electronic Bidding System.

All addenda so issued shall become part of the Contract Documents. Acknowledgement of receipt of any and all addenda is required in the BID SCHEDULE. Failure of any bidder to receive any addenda shall not relieve such bidder from any obligations imposed by such addenda. The effect of all addenda to the Contract Documents shall be considered in the bid and said addenda shall be acknowledged on the Bid Proposal. Before submitting a bid, each bidder shall inform himself as to whether or not any addenda have been issued. Failure to determine the existence of any addenda, to obtain and review such addenda, or to include in the bid any obligations imposed by such addenda issued may render the bid irregular and may result in its rejection.

4. BIDDERS INTERESTED IN MORE THAN ONE BID
No person, firm or corporation shall make, file or be interested in more than one ( 1) bid for the same work unless alternative bids are specifically requested. A person, firm or corporation who has submitted a sub -proposal to a bidder, or who has quoted prices of materials to a bidder, is not disqualified from submitting a sub -proposal or quoting prices to other bidders. 7 06/24/2025
C10
18 of 352

5. FORM OF BID AND SIGNATURE
The bids shall be made on the Bid forms provided through the City' s Electronic Bidding System.

These documents shall constitute the bid. The bid shall be submitted electronically for this solicitation on the City' s OpenGov portal at: https:// secure. opengov. com/ portal/ cityofvista.

Bidders must also mail their bid security or original bidder' s bond with a postmarked date no later than the Bid Date as described in Section 11 Bid Security/ Return of Bid Securities below.

The Bid for the Work is intended to establish a total cost for the Work in its entirety. The Bidder shall state in the Bid the unit prices or Lump Sums for which he proposes to supply the labor, materials, supplies and equipment necessary to complete the Work required by the Contract Documents. Certain permit requirements, General Provisions, Supplementary General Provisions, and other work required by the Plans and/ or the Specifications may not be listed in the Bid Schedule and are, in general, applicable to more than one listed Bid Item. Other required work may not be listed as a separate item in the Bid Schedule, but is necessary to complete the Work described in the Plans and/ or the Project Specifications. The Bidder shall include the cost of all work not listed as a separate item in the Bid Schedule in the various related items of work listed in the Bid Schedule, so that the Bid for the Project reflects the total cost for completing the Work in its entirety.

If the proposal is made by an individual, it shall be signed and his full name and address shall be given; if it is made by a firm, it shall be signed with the partnership name by a member of the firm, who shall also sign his own name, and the name and address of each member shall be given; and if it is made by a corporation, the name of the corporation shall be signed by its duly authorized officer or officers attested by the corporate seal, and the names and titles of all officers of the corporation shall be given.

6. PREPARATION OF THE BID / REJECTION OF THE BID
The Bid shall be prepared such that it is complete and responsive to all requirements of the Contract Documents. The completed Bid shall consist of the following forms:
a) Bid Proposal
b) Bid Schedule
c) Contractor' s Licensing Statement
d) Project References
e) Contractor' s List of Subcontractors
f) Non - Collusion Declaration
g) Bid Security Form ( with bid bond, cash, certified check or cashier' s check included) Registered bidders may obtain the Contract Documents through the City' s Electronic Bidding System.

Blank spaces in the Bid shall be properly filled in ( using figures in the Bid Schedule). The Bid shall contain an acknowledgment of receipt of all addenda. 0 06/24/2025
C10
19 of 352
The phraseology of the Bid must not be changed, and no addition shall be made to the items mentioned therein. Alternative bids shall not be considered unless specifically requested and authorized by the Agency.

The Bid shall be signed in accordance with the " Instructions for Signing Bids, Bonds, and Contracts", included in the Contract Documents, and as required by the City' s Electronic Bidding System.

The bidder shall set forth for each unit basis item of work a unit price and a total for the item, and for each lump sum item a total for the item, all in clearly legible figures in the respective spaces provided for that purpose. In the case of unit basis items, the amount set forth under the " Item Total" column shall be the product of the unit price bid and the estimated quantity for the item. Unit prices shall not exceed two ( 2) decimal places.

All extensions of the unit prices bid and sums will be subject to verification by the Agency. If the unit prices entered by the Bidder exceed two ( 2) decimal places, the Agency will only use the first two ( 2) digits after the decimal points without rounding up or down.

In case of discrepancy between the unit price and the total set forth for a unit basis item, the unit price shall prevail, except as provided in ( a) or ( b), as follows:
a) If the amount set forth as a unit price is unreadable or otherwise unclear, or is omitted, or is the same as the amount as the entry in the item total column, then the amount set forth in the item total column for the item shall prevail and shall be divided bythe estimated quantity for the item and the price thus obtained shall be the unit price; b) If the product of the entered unit price and the estimated quantity is exactly off by a factor of ten, one hundred, etc., or one - tenth, or one - hundredth, etc. from the entered total, the discrepancy will be resolved by using the entered unit price or item total, whichever most closely approximates percentage - wise the unit price or item total in the Agency' s Final Estimate of cost.

Bids on lump sum items shall be item totals only; if any unit price for a lump sum item is included in a bid and it differs from the item total, the item total shall prevail.

If both the unit price and the item total are unreadable or otherwise unclear, or are omitted, the bid may be deemed irregular. Likewise if the item total for a lump sum item is unreadable or otherwise unclear, or is omitted, the bid may be deemed irregular unless the project being bid has only a single item and a clear, readable total bid is provided.

A Bid shall be considered irregular if certain situations occur, including, but not limited to, the following:
a) The Bid contains blank spaces that are not properly filled in. b) The Bid contains unauthorized provisions, conditions, limitations, or alternatives. c) The Bid is either not typewritten or not printed in ink.

M
06/24/2025
C10
20 of 352
d) The Bid contains interlineations, alterations, erasures, clerical errors or is otherwise illegible or unclear, or not properly initialed.
e) The Bid is not properly signed in accordance with the instructions. f) The Bid contains unit prices and/ or item totals that are unreadable or otherwise unclear, or are omitted.
g) The Bid contains a significant " material" difference between the bid total written in figures, the bid total written in words, and/ or the sum of the item totals after any math errors are corrected.

Bidder' s failure to submit the Bid on time through the City' s Electronic Bidding System, submit a complete Bid using all of the required Bid forms provided in the Contract documents or addenda, include a price for any Bid item that requires the Bidder to submit a price, acknowledge all addenda, or submit the appropriate Bid Security shall render the Bid non -responsive and shall be cause for its rejection.

In accordance with the provisions of Section 1771. 1( b) of the California Labor Code - the Agency will not accept bid or enter into a Contract without proof of the contractor' s current registration with the California Department of Industrial Relations pursuant to Section 1725. 5.

The Agency, in its sole discretion, reserves the right to reject any or all bids, and to waive any informalities or minor irregularities in the Bids, unless waiving such irregularity would give a competitive advantage to a Bidder.

7. ALTERNATIVE SCHEDULES
Bidders are directed to review the BID SCHEDULE and the appendices for details regarding the alternate bid items, if included.

The Agency will evaluate the bids based on the total amount of the Base Bid Items, and will not include the Alternate Bid Item( s) in determining the lowest responsible bidder. The Agency reserves the right to award the Contract on the Base Bid Items, and with or without any or all of the Alternate Bid Item( s). The Agency reserves the right to adjust the quantity of the Alternate Bid Item( s) after the award of contract.

8. LIST OF SUBCONTRACTORS FILED WITH BID
In accordance with the provisions of Sections 4100 through 4113, inclusive, of the Public Contract Code of the State of California (" Subletting and Subcontracting Fair Practices Act"), each bidder shall submit with his bid the name, location of place of business, and Contractor' s License Number of each proposed subcontractor who will perform work or labor or render service to the principal Contractor in an amount in excess of one- half of one percent ( 0. 5%) of the principal Contractor' s bid, or in the case of the construction of streets or highways, in excess of one- half of one percent ( 0. 5%) or ten thousand dollars ($ 10, 000), whichever is greater, and shall state the portion and dollar value of the Work which will be done by each such subcontractor in the List of Subcontractors form. If no subcontractor is listed for a portion of the Work, then the Contractor is required to perform that portion with his own forces. 10 06/24/2025
C10
21 of 352
An inadvertent error in listing the subcontractor' s license number shall not be grounds for filing a bid protest, or grounds for considering the bid nonresponsive, if the corrected contractor' s license number is submitted to the public entity by the prime contractor within 24 hours after the bid opening, provided that the corrected license number corresponds to the submitted name and location of the subcontractor.

Pursuant to Section 1725. 5 of the Labor Code of the State of California, no contractor may be awarded a public works contract and no subcontractor of any tier may work on a public works project without proof of registration with the Department of Industrial Relations. To comply with these regulations, each bidder being considered for award of the Contract shall submit to the Agency the names and PWC Registration Number of each proposed subcontractor of any tier who will perform work or labor or render service to the principal Contractor in any amount within 7 days after the bid opening date. The inadvertent listing on the bid documents of a subcontractor that is not registered with the California Department of Industrial Relations will not necessarily invalidate the bid. An unregistered subcontractor can be replaced with one who is registered.

9. NON - COLLUSION DECLARATIONS
The bidder is required to execute a Non - Collusion Declaration in the form attached hereto, and submit the form with the bid. The Agency reserves the right to require, before awarding the contract, that the principal Contractor secure from each proposed subcontractor a Non -Collusion Declaration in the form also attached hereto, and submit all forms to the Agency.

If at any time it shall be found that the person, firm or corporation to whom the Contract has been awarded has, in presenting any bid or bids, colluded with any other party or parties, then the Contract so awarded shall be null and void, and the Contractor and the Contractor' s sureties shall be liable to the Agency for all loss or damage which the Agency may suffer thereby, and the Agency may advertise anew for bids for such work.

10. BID SECURITY/ RETURN OF BID SECURITIES
Each bidder shall submit with his bid an unconditional certified or cashier' s check drawn on a solvent state or national bank, or a bidder' s bond with a responsible corporate surety, on the form attached hereto, subject to the provisions for " Bonds" herein. Unless otherwise stated in the Contract Documents, said bid security or bidder' s bond shall be in a sum at least ten percent 10%) of the total base bid amount, and shall be made payable to the Agency as a guaranty that the bidder will, if an award is made, in accordance with the terms of his bid, promptly execute a Contract in the required form, secure payment of Workmen' s Compensation, and furnish satisfactory Performance Bond, Payment Bond, and certificates of insurance, and endorsements within ten ( 10) Working Days following the posting of the Notice of Intent to Award a contract.

Notice of instructions to Principal and Surety regarding completion of Bidder' s Bond:
11 06/24/2025
C10
22 of 352
1) Principal' s signature with title must be properly notarized ( i.e., proprietorship, partnership, corporation, joint venture). If corporation, affix seal; 2) Signature of Attorney - in -Fact for Surety must be properly notarized; 3) Attach certified copy of Power of Attorney for Surety' s Attorney - in -Fact; and 4) If bond is executed in excess of surety company' s treasury limit, evidence of how bond was reinsured must be attached over signature of Attorney - in -Fact.

Bidders must scan and upload a copy of their bid security or bidder' s bond with their electronic bid submittal in OpenGov. Bidders must also mail their bid security or original bidder' s bond with a postmarked date no later than the Bid Date, to the following address:

ATTN: Ken Knatz
City of Vista Engineering Department
200 Civic Center Drive
Vista, CA 92084
The Bidder' s name and the name of the Project shall be clearly listed on the outside of the envelope. To be eligible for a contract award, the Bidder' s bid security or original bidder' s bond must be received by the Agency within ten ( 10) working days of the posting of the Notice of Intent to Award a contract.

If a bidder to whom an award is made fails or refuses to execute the Contract, secure the payment of Worker' s Compensation and furnish the required bonds and proof of insurance, all within the time stated in the provisions for " Execution of Contract / FAILURE TO EXECUTE CONTRACT" herein, the money represented by said check or bidder' s bond shall become and remain the property of the Agency, the amount thereof being agreed to by the bidder as liquidated damages due the Agency on account of the delay in the execution of the Performance Bond, Payment Bond, and proof of insurance coverage, and in the performance of work thereunder, resulting from such failure or refusal.

The Agency reserves the right to retain the bid security of the three ( 3) apparent lowest responsible Bidders until the Contract Documents have been formally executed by the successful Bidder and the Agency, and the successful Bidder has filed with the Agency the Faithful Performance Bond, the Contractor' s Payment Bond, and the insurance policies or certificates required by the Bid Documents, after which such bid securities will be returned to the respective Bidders whose bids they have accompanied.

11. PROJECT REFERENCES
All bidders shall provide evidence satisfactory to the Agency that the bidder has prior experience to properly perform in accordance with the terms of these Plans and Specifications by completing and submittingthe PROJECT REFERENCES spreadsheet with his bid. The PROJECT REFERENCES list shall include projects successfully performed by the Bidder of comparable magnitude that he or his associates are personally competent to manage the proposed undertaking, and to carry it forward to a successful conclusion.
12 06/24/2025
C10
23 of 352

12. LICENSE REQUIREMENTS
All prospective contractors submitting a bid shall have the appropriate license as required by these specifications. Failure to possess the specified license at the time of award shall render the bid as non -responsive and shall act as an absolute bar to award the Contract to any bidder not possessing said license at the time of award. Any Contract awarded to a contractor who was not properly licensed at the time of award or at any time during the Contract period shall be void pursuant to Section 7028. 15 of the Business and Professions Code. The Agency shall verify that a contractor is properly licensed prior to the award of the Contract as part of determining the lowest responsible and responsive bidder.

13. CONTRACTOR' S REQUIRED SHARE OF CONTRACT WORK
In accordance with Subsection 2- 3. 2, Self Performance of the Standard Specifications for Public Works Construction, the Contractor shall perform, with its own personnel from within its organization, Contract work amountingto at leastfifty percent ( 50%) of the Contract Price, except that any designated " Specialty Items" may be performed by subcontract and the amount of any such " Specialty Items" so performed may be deducted from the Contract Price before computing the amount of work required to be performed by the Contractor with its own personnel [ i.e. the percentage of work which will not be performed by a Bidder' s own forces will be determined by 1) adding the dollar value of all contracts shown on the list of subcontractors ( excluding the dollar amount of any specialty items), then ( 2) dividing such total by the Bidder' s Total Bid Amount ( excluding the dollar amount of specialty bid items)].

14. ANNUAL PUBLIC WORKS BIDDER REGISTRATION ( SB 854)
In accordance with the provisions of California Senate Bill 854, passed by the California State Senate on June 20, 2014, all contractors and subcontractors bidding and performing work on Public Works Projects must register on an annual basis with the California Department of Industrial Relations ( DIR) and furnish electronic payroll records to the Labor Commissioner' s Office.

In accordance with the provisions of Section 1771. 1( a) of the California Labor Code, a contractor or subcontractor shall not be qualified to bid on, be listed in a bid proposal, subject to the requirements of Section 4104 of the Public Contract Code, or engage in the performance of any Contract for public work, as defined in this chapter, unless currently registered and qualified to perform public work pursuant to Section 1725. 5. It is not a violation of this section for an unregistered contractor to submit a bid that is authorized by Section 7029. 1 of the Business and Professions Code or by Section 10164 or 20103. 5 of the Public Contract Code, provided the contractor is registered to perform public work pursuant to Section 1725. 5 at the time the Contract is awarded. Prime contractors and their subcontractors must possess and maintain such registration with DIR in order to be awarded contracts and to perform work.
13 06/24/2025
C10
24 of 352
The Agency will verify that the contractors or subcontractors that bid on, or are listed in the bid proposal of, this Contract are currently registered and qualified to perform public work pursuant to Section 1725. 5 in the State of California through the following URL website link at:
https:// dir. ca. gov/ Public- Works/ Contractors. html In accordance with the provisions of Section 1771. 1( a) of the California Labor Code - the Agency will not accept a bid or enter into a Contract without proof of the contractor' s current registration to perform public works pursuant to Section 1725. 5.

In accordance with the provisions of Section 1773. 3 of the California Labor Code, the Agency will provide notice to the Department of Industrial Relations of any public works Contract within thirty ( 30) days of the award, but in no event later than the first day in which a contractor has workers employed upon the public work, using the online PWC-100 " Extract of Public Works Contract Award" form, which can be found at:.
https:// www. dir.ca. gov/ pwc100ext/ Logi nPage. aspx
The online PWC-100 form is also transmitted to the Department of Apprenticeship Standards DAS) to inform them of the award of a contract.

15. MODIFICATION AND WITHDRAWAL OF THE BID
Any Bidder may modify his prior to the scheduled closing time for receipt of bids by submitting an amended bid through the City' s Electronic Bidding System.

A bidder may withdraw his bid before the hour fixed for opening bids, without prejudice to himself, by cancelling their bid submission through the City' s Electronic Bidding System. No proposal may be withdrawn after the hour fixed for opening bids without rendering the accompanying certified or cashier' s check or bidder' s bond subject to forfeiture as liquidated damages in like manner as in the case of failure to execute the Contract after award, as hereinafter provided.

After the bids have been publicly opened, they shall not be withdrawn by the Bidders for a period of at least ninety ( 90) calendar days subject to the execution stated in the paragraph below. The ninety ( 90) calendar day review period may be extended by the Agency and written approval by the Bidder.

A Bidder shall be permitted to withdraw a bid after the opening of the bids only if the Bidder established to the satisfaction of the Agency ALL of the following:
a) A clerical error was made by the Bidder in filling out the bid; and the error was not due to:
1) an error in judgment;
2) an error in inspecting the site of the Work, or;
3) an error in reading the Plans and Contract Documents. b) The clerical error made the bid materially different than the Bidder intended the bid to be. 14 06/24/2025
C10
25 of 352
c) The Bidder gave the Agency written notice within five ( 5) Working Days excluding Saturdays, Sundays, and State holidays, after the opening of the bids, in which said notice specifies in detail the nature of the error and how the error was made per Public Contract Code 5103( b).

16. ( INTENTIONALLY LEFT BLANK)

17. PUBLIC OPENING OF BIDS
No bid received after the time named or at any place other than the place stated in the Notice Inviting Bids shall be considered. Immediately after the bid submission deadline, bids will be unsealed and posted at: https:// secure. opengov. com/ portal/ vista- ca. OpenGov will determine the official time for the advertised bid opening and such determination will be final. Bid Tabulation results will be available through OpenGov.

After the bids are publicly opened, the Agency shall review all bids for responsiveness, compare the bids to the Engineer' s Opinion of Probable Cost and investigate the responsibility and qualifications of all Bidders to whom the award is contemplated, for a period not to exceed ninety 90) calendar days after the Bids have been opened. Based on the findings from the review of the Bids, the Agency will provide a Notice of Intent to Award a contract to all bidders.

Following the posting of the Notice of Intent to Award a contract, anyone interested in inspecting bid documents in person or receiving electronic copies shall make a request to the City Engineer following the posting of the Notice of Intent to Award a contract. Bid documents will be sent electronically, and appointments for inspection of the bid documents will be scheduled to occur, within five ( 5) Working Days after the request is received by the Agency.

18. DISQUALIFICATION OF BIDDERS
Any one or more of the following causes may be considered as sufficient for the disqualification of Bidder and the rejection of the Bidder' s bid or bids:
a) Submittal of more than one ( 1) bid for the same work from an individual firm, partnership, or corporation under the same or different names.
b) Evidence of collusion among Bidders.
c) Modification of BID SCHEDULE.
d) Submittal of an incomplete or invalid bid, and / or failure to include all required information, which precludes full analysis and review of said Bid and / or which precludes meaningful comparison of the Bid with other bids received by the Agency.

19. BID PROTESTS
Any bidder who submits a valid bid shall have the right to file a bid protest with the Agency before 5: 00 p.m. on the fifth Working Day following the posting date of the Notice of Intent to Award a 15 06/24/2025
C10
26 of 352
contract. However, bidder shall receive an extension to this deadline if the Agency has not fulfilled bidder' s request for electronic copies of the bid documents or for an opportunity to inspect the bid documents at least two ( 2) Working Days prior to the deadline. In such cases, bidder may submit a bid protest before 5: 00 p.m. on the fifth Working Day following the date on which bidder receives, or is provided an opportunity to inspect, the bid documents. Bid protests must be submitted in writing to the City Engineer of the City of Vista, City of Vista Civic Center, Engineering Department, 200 Civic Center Drive, Vista, California 92084- 6275. The time limits and requirements set forth in this section are mandatory, and are the bidder' s sole and exclusive remedy in the event of a bid protest, and failure to comply with these requirements shall constitute a waiver of any right to further pursue the bid protest, including filing a Government Code Claim or legal proceedings. If a protest is received from anyone other than a bidder, or after the specified time period, the protest shall be invalid. The protest shall conform to the following requirements:
a) The initial protest document shall contain a complete statement of the basis for the protest. b) The protest shall refer to the specific portion, or portions, of the document that form the basis for the protest.
c) The protest shall contain the name, address, and telephone number of the person representing the protesting party.
d) The party filing the protest shall concurrently transmit a copy of the initial protest document, and any attached documentation, to all other parties with a direct financial interest that may be adversely affected by the outcome of the protest. Such parties shall include all other bidders or proposers who appear to have a reasonable prospect of receiving an award depending upon the outcome of the protest.
e) The Agency shall issue a decision on the protest.

20. AWARD OF CONTRACT
No bidder may withdraw its bid for a period of ninety ( 90) calendar days.

The Contract shall be awarded within ninety ( 90) calendar days after the opening of bids, if it is in the interest of the Agency to do so. The Agency reserves the right to waive any informality or minor irregularities in any bid, to reject any or all bids, to reject one part of a bid and accept the other, except, to the extent that bids are qualified by specific limitations, to take bids under advisement for a period of ninety ( 90) calendar days after the date the bids are publicly opened, and to make award to the lowest responsible bidder as the interest of the Agency may require.

All terms and conditions contained in the Contract Documents shall become a part of the contract.
16 06/24/2025
C10
27 of 352

21. EXECUTION OF CONTRACT/ FAILURE TO EXECUTE CONTRACT
A bidder whose proposal is being recommended for acceptance shall execute a written Contract with the Agency, in the form of the CONSTRUCTION CONTRACT attached hereto, prior to contract award and within the time requested by the Agency. Thereafter, a bidder to whom an award is made shall secure the payment of Workmen' s Compensation, and furnish good and approved bonds and insurance certificates, all as required in the following paragraph and all in accordance with the provisions hereof, within ten ( 10) Working Days from the date of the posting of the Notice of Intent to Award a contract, by the Agency to the bidder, according to the address given by him in his proposal.

If a bidder to whom award is made fails or refuses execute the Contract prior to bid award, or to thereafter conform to any of the stipulated requirements in connection therewith, the money represented by his check or bidder' s bond shall become the property of the Agency, as provided in the provisions for " Bid Security" herein, any award made will be annulled, and, atthe discretion of the Agency, an award may be made to the bidder whose proposal is next most acceptable to the Agency, and such bidder shall fulfill every stipulation embraced herein as if he were the party to whom the first award was made. A corporation whose proposal is being recommended for acceptance may be required, before the Contract is executed, to furnish evidence of its corporate existence, of its right to do business in California, and of the authority of the officer signing the Contract and bonds for the corporation.

22. BONDS
Except as otherwise provided in the Contract Documents, a bidder to whom the Contract is awarded shall, within the time stated in the provisions for " EXECUTION OF CONTRACT/ FAILURE TO EXECUTE CONTRACT" herein, furnish a bond with an admitted corporate surety, or corporate sureties conditioned upon the faithful performance of the said bidder of all covenants and stipulations in the Contract. Said bond, hereinafter referred to as the Faithful Performance Bond, shall be in the form approved by the Agency and in the penal sum of at least one hundred percent 100%) of the total base bid amount payable under the Contract secured by two ( 2) or more sufficient sureties or by a surety company.

Within the time mentioned in the preceding paragraph, the bidder to whom the Contract is awarded shall also furnish a Payment Bond, approved by the Agency, in accordance with the provisions of Civil Code Section 3225- 3228, inclusive, and Sections 3247- 3252, inclusive.

Unless otherwise specified in the Contract Documents, said Payment Bond shall be in a sum not less than one hundred percent ( 100%) of the total amount payable by the terms of this Contract, but not less than the sum prescribed by Section 3248 of the Civil Code, in any case.

Each bond shall incorporate, by reference, the Contract, and be signed by both the Contractor and the Surety.

Sureties must:
1) be listed in the latest version of U.S. Department of Treasury Circular 570 at:
17 06/24/2025
C10
28 of 352
https:// www. fiscaI. treasury. gov/ fsreports/ ref/ suretVBnd/ c570 a- z. htm 2) be authorized to issue bonds in California;
3) have bonding limitation shown in said Circular 570 sufficient to provide bonds in the amount required for the contract.

The Agency will verify that the corporate surety or sureties that furnish bonds for this Contract are admitted sureties authorized to provide such services in the State of California through the following URL website link at:
http:// www. insurance. ca. gov
The surety or sureties on all bonds furnished must be satisfactory to the Agency. All insurance or surety companies providing insurance or surety bond( s) under the Contract shall be admitted in the State of California to transact the insurance business in the class of the type provided and shall have a general policy holder' s rating of " A" or higher and a Financial Class V ($ 10, 000, 000) or better as established in the most current A. M. Best' s Key Rating Guide or equivalent or greater rating established by another recognized rating entity such as Moody' s; provided however, that for the workers' compensation and employers' liability insurance business and having a general policy holders' rating of " A" or higher and a Financial Class VI or higher in the most current A.M.

Best' s Key Rating Guide. The party required to furnish bonds pursuant to these instructions shall furnish such bonds at his cost and expense. The Agency reserves the right to reject any bond if, in the opinion of the Engineer, the surety' s acknowledgment is not in the form included in the Contract Documents or in another form substantially as prescribed by law.

Surety companies and insurance companies shall familiarize themselves with all of the conditions and provisions of the contract, and they waive the right of special notification of any change or modification of the Contract or of decreased or increased work or of the cancellation of the contract, or of any other acts by the Agency or its authorized agents, under the terms of the contract. Notwithstanding the provisions of any other contract or agreement, the failure of any surety company or insurance companyto receive notification of any of the aforesaid changes shall in no way relieve the surety company or insurance company of its obligations under the contract. Notwithstanding any other provisions of the Contract Documents inconsistent with the provisions of this section, the Contractor shall not be responsible for the cost of repairing or restoring damage to the Work in excess of five percent ( 5%) of the Contract price caused by an act or acts of God, as defined in Public Contract Code Section 7105, occurring after the Contract for the Work is entered into.

To be approved, the Payment Bond must be in the form provided in these Project Specifications.

Unless a Contractor' s Payment Bond is filed and approved as herein provided, no claim in favor of the Contractor arising under the Contract shall be audited, allowed or paid by the Agency. Any persons named in Section 3181 of the California Civil Code shall receive payment of their respective claims in the manner provided by Chapter 4, Part 4, Division 3, Title 15 of the California civil Code upon having complied with the conditions of Section 3183 of the California Civil Code.

M
06/24/2025
C10
29 of 352

23. NOTIFICATION OF SURETY COMPANIES
The surety companies and other signers of any of the above mentioned bonds and insurance companies, shall familiarize themselves with all of the conditions and provisions of the contract, and they waive the right of special notification of any change or modification of the Contract or of extension of time, or of decreased or increased work, or of the cancellation of the Contract, or of any other act or acts by the Agency or its authorized agents, under the terms of the Contact; and failure to so notify the aforesaid surety companies or insurance companies of changes shall in no way relieve the surety companies of their obligation under the Contract.

24. LIABILITY INSURANCE
Before the Contract is executed on behalf of the Agency, a bidder to whom the Contract has been awarded shall furnish to the Agency a policy or certificate of protective liability insurance in which the Agency shall be named as an additional insured with the bidder. The policy shall insure the Agency, its officers and its employees, the bidder, his employees, and his subcontractors and their employees, and their heirs, agents, and employees, while acting within the scope of their duties, against all claims arising out of or in connection with the Work to be performed, and shall remain in full force and effect until the Work is accepted by the Agency. The policy shall provide for the limits stated with any insurance policy carried by the Agency. The public liability insurance shall be in the amounts set forth in of the Supplementary General Provisions. The insurance company shall meet the financial strength rating requirements set forth in the General Provisions.

25. INSURANCE CODE REQUIREMENTS
Attention is called to the provisions of the Insurance Code of the State of California with reference to the writing of insurance policies and bonds covering risks located in this state, and the premiums and commissions thereon. A bidder to whom the Contract is awarded shall furnish, at the time his bond or bonds are submitted for approval, satisfactory evidence that the requirements of said code have been observed.

26. ASSIGNMENT
In accordance with Section 4552 of the Government Code, the bidder shall conform to the following requirements. In submitting a bid to the Agency, the bidder offers and agrees that if the bid is accepted, it will assign to the Agency all rights, title and interest in and to all causes of action it may have under Section 4 of the Clayton Act ( 15 U.S.C. Section 15) or under the Cartwright Act [ Chapter 2 ( commencing with Section 16700) of Part 2 of Division 7 of the Business and Professions Code], arising from purchases of goods, services or materials by the Bidder for sale to the purchasing body pursuant to the bid. Such assignment shall be made and become effective at the time the purchasing body tenders final payment to the bidder. 19 06/24/2025
C10
30 of 352

27. WAGE RATES
Pursuant to the Vista City Charter and the Vista Municipal Code, payment of prevailing wages and compliance with the California Labor Code Sections 1770 et sea IS required for this Project.

It shall be mandatory upon the Contractor to whom the Contract is awarded, and upon all subcontractors under him, to pay not less than the general prevailing rates of wages to all workers employed in the execution of this Contract in accordance with the provisions of the California Labor Code and general law. Certified payroll on an approved compliance format is required for all work under this Contact and shall be submitted directly to the Labor Commissioner' s Office as required by law.

In accordance with the requirements of Section 1726 of the Labor Code, the Agency will ensure that public works contractors pay prevailing wages and are in compliance with public works laws and will report any suspected violations to the Labor Commissioner:

In accordance with the requirements of Section 1727 ( a) of the Labor Code, the Agency will withhold and retain all amounts required to satisfy any Civil Wage and Penalty Assessment.

Information on the current prevailingwages can be obtained by contactingthe State of California, Department of Industrial Relations, Division of Labor Statistics and Research, 45 Fremont Street, Suite 1160, San Francisco, California, 94105, ( 415) 703- 4774 or from the California Department of Industrial Relations' internet website at http:// www. dir. ca.gov.

28. SUBSTITUTION OF SECURITIES IN LIEU OF RETENTION
The Contractor may elect to receive one hundred percent ( 100%) of payments due under the Contract Documents from time to time, without retention from any portion of the payment by the Agency, if the Contractor deposits securities of equivalent value with the Agency in accordance with the provisions of Section 22300 of the California Public Contract Code. Such securities, if deposited by the Contractor, shall be valued by the Agency, whose decision on valuation of the securities shall be final. Securities eligible for investment under this provision shall be limited to those listed in Section and 16430 of the California Government Code.

INSTRUCTIONS FOR SIGNING BIDS, BONDS AND CONTRACTS

CORPORATIONS
Give name of corporation.

Proof of authorization shall be established ( pursuant to Corporation Code Section 313) when the corporate officers listed below both sign the documents:

Signatures: Chairman of Board or President or Vice -President AND Secretary or Assistant Secretary or Chief Financial Officer or Assistant Treasurer. 20 06/24/2025
C10
31 of 352
Affix corporate seal and Notary' s acknowledgment.

Others may sign to bind the corporation if the Agency has been furnished a certified copy of a resolution of the corporate board of directors authorizing them to do so.

PARTNERSHIPS
Signatures: All members of partnership. One may sign if the Agency has a copy of authorization i.e., a Certificate of Partnership ( State form LP-1 for Limited Partnerships) or a copy of the partnership agreement is sufficient to establish the authority of a single general partner to bind the partnership].

Affix Notary' s acknowledgment.

JOINT VENTURES
Give the names of the joint ventures.

Signatures: All joint ventures. One may sign if the Agency has a copy of authorization.

Affix Notary' s acknowledgment.

INDIVIDUALS
Signature: The individual.

Affix Notary' s acknowledgment.

FICTITIOUS NAMES
Show fictitious names.

BONDS
Satisfy all pertinent requirements shown above ( note: If the Bidder is a sole proprietorship, either a Fictitious Business Name Statement or a City of Vista business license is sufficient to establish the authority of an individual to bind the sole proprietorship).

In addition to all pertinent requirements above, give signature of Attorney - in -Fact and apply surety' s seal.
21 06/24/2025
C10
32 of 352

BID PROPOSAL
From: , Bidder,
For: The construction of

WASTEWATER PIPELINE MODIFICATIONS
as specifically set forth in documents entitled
EMERGENCY MODIFICATIONS - BUENA OUTFALL FORCEMAIN PHASE III PROJECT ( C. I. P. No. 8131) The undersigned hereby proposes and agrees that if his bid as submitted in the attached BID SCHEDULE be accepted, he will contract in the form so approved to perform all work for which a Contract may be awarded him, to furnish any and all plant, labor, services, materials, tools, equipment, supplies, transportation, utilities and all other items and facilities necessary therefore as provided in the Contract Documents, and to do everything required therein for the proposed Project as specifically set forth in said Contract Documents, together with appurtenances thereto, all as set forth on the Drawings and in the Project Specifications and other Contract Documents; and he further proposes and agrees to complete all the Work called for by the Drawings, Project Specifications, and other Contract Documents in strict conformity therewith within the time limits set forth therein; and that he will accept as full payment therefore the prices set forth in the BID SCHEDULE forming a part hereof.

The undersigned hereby submits either a Bid Bond or Bid Security in the form of Cash, a Cashier' s Check, or a Certified Check, using the forms included in these Bid Documents, properly made payable to CITY OF VISTA, hereinafter designated as the Agency, in an amountthat is at leastten percent ( 10%) of the total base bid amount. The Bid Bond or Bid Security is attached hereto and is given as a guaranty that the undersigned will execute the Contract and furnish the required bonds if awarded the Contract and, in case of failure to do so within the time provided, the proceeds of said bond or bid security shall be forfeited to the Agency. The Surety' s liability to the Agency for forfeiture of the face amount of the bond shall be considered as established.
22 06/24/2025
C10
33 of 352
It is understood and agreed that:

1. The undersigned has carefully examined all Bid documents and other Documents which will form the Contract, including all addenda as prepared prior to the date of bid opening setting forth any modifications or interpretations of any said documents.

2. The undersigned has, by investigating the site of work, by reviewing and analyzing the Plans and Specifications, and by otherwise familiarizing himself with the Project, has satisfied himself as to the nature and location of the Work and has fully informed himself as to all conditions and matters which can in any way affect the Work or the cost thereof.

3. The undersigned fully understands the scope of the Work and has included in the various related items of Work the cost of all work not listed as a separate item so that the Bid for the Project reflects the total cost for completing the Work in its entirety, has checked carefully all words and figures inserted in this Bid, and he further agrees that the Agency shall in no way be responsible for any errors or omissions in the preparation of this proposal.

4. The undersigned will execute the Contract and furnish the required Performance Bond, Payment Bond, and proof of insurance coverage within the stipulated time after the posting of a notice to him of acceptance of his bid by the Agency; and further, that this bid may not be withdrawn for a period of ninety ( 90) calendar days after the date set for the opening thereof unless otherwise required by law. If any bidder shall withdraw his bid within said period, the bidder shall be liable under the provisions of the Bid Security, or the bidder and his surety shall be liable under the Bid Bond, as the case may be.

5. The surety or sureties and insurance companies named in the space provided have agreed to furnish bonds, insurance, and endorsements in the form and amounts set forth in the Contract Documents in the event the Contract is awarded on the basis of this proposal.

6. The undersigned hereby certifies that this proposal is genuine and not sham or collusive or made in the interest or in behalf of any person not herein named, and the undersigned has not directly or indirectly induced or solicited any other bidder to put in a sham bid, or any other person, firm or corporation to refrain from bidding, and the undersigned has not in any manner sought by collusion to secure for himself an advantage over any other bidder.

7. In conformance with current statutory requirements of Section 1860, et. seq., of the Labor Code of the State of California, the undersigned confirms the following as his certification:

I am aware of the provisions of Section 3700 of the Labor Code which require every employer to be insured against liability for workers' compensation or to undertake self- insurance in accordance with the provisions of that code, and I will comply with such provisions before commencing the performance of the work of this contract."

8. Receipt of Addenda No. _ through _ is hereby acknowledged. ( If none, write " NONE") 23 06/24/2025
C10
34 of 352

9. In compliance with the Notice Inviting Bids and all the provisions hereinbefore stipulated, the undersigned, with full cognizance thereof, hereby proposes to perform the entire work for the prices set forth in the attached BID SCHEDULE upon which award of the Contract is made.

Continued on next page)
24 06/24/2025
C10
35 of 352
DATE: 20,

CORPORATE SEAL)
Name and address of all members
of the firm or names of all officers
of the corporation.

BIDDER' S NAME
BY
Signature
Printed Name
TITLE
BY
Signature
Printed Name
TITLE
BIDDER' S MAILING ADDRESS:

CORPORATION ORGANIZED UNDER THE LAWS

OF THE STATE OF
CONTRACTOR' S LICENSE #

EXPIRATION DA

CONTRACTOR' S LICENSE CLASS
SURETY OR SURETIES:

INSURANCE COMPANY:

I certify ( or declare) under penalty of perjury under the laws of the State of California that the foregoing is true and correct:

Date CONTRACTOR' S SIGNATURE
25 06/24/2025
C10
36 of 352

BID SCHEDULE
Pursuant to and in compliance with the Notice Inviting Bids and other Contract Documents relating to the proposal for the construction of

WASTEWATER PIPELINE MODIFICATIONS
as specifically set forth in documents entitled
EMERGENCY MODIFICATIONS - BUENA OUTFALL FORCEMAIN PHASE III PROJECT ( C. I. P. No. 8131) all in accordance with the Plans and Project Specifications on file at the City of Vista Engineering Department, the undersigned bidder, having familiarized himself with the terms of the Contract, the local conditions affecting the performance of the Contract and the cost of the Work at the place the Work is to be done; and with the Plans, Project Specifications and other Contract Documents, hereby stipulated; the Contractor agrees to complete the Contract, including all of its component parts and everything required to be performed, and to provide and furnish any and all labor, materials, tools, equipment, expendable supplies and all utility and transportation services necessaryto perform the Contract, and complete in a workmanlike manner all of the Work required in connection with the Contract, all in strict conformance with the Plans and Project Specifications on file at the City of Vista Engineering Department.

All items shall be finished and functional per Plans and the Contract Documents. Items designated with an ` S' in the Bid Item column of the Bid Schedule are Specialty Items per Subsection 2-3. 2 Self Performance") of the San Diego Regional Supplement to the Greenbook.

Notes:
1] Please type or print legibly in spaces provided in the BID SCHEDULE. 2] Please do not use pencil.
3] Unit Prices shall be entered to two ( 2) decimal places only. 26 06/24/2025
C10
37 of 352

BID SCHEDULE
PROJECT NAME: EMERGENCY MODIFICATIONS - BUENA OUTFALL FORCEMAIN PHASE III PROJECT C. I. P. No. 8131)
NAME OF BIDDER:

Base Bid Items
Bid
Of WorkDescriptionp Qty. Unit Unit Price Item Total
Item

GENERAL
1 Mobilization & Demobilization
1 LS
5% maximum of Total Base Bid)
2 Erosion Control and BMPS ( project < 1 AC earth 1 LS
disturbance, SWPPP not required)
3 Dewatering measures 1 LS
4 Traffic Control and Construction Staging per City of 1 LS Carlsbad requirements
5 Sheeting, Shoring and Bracing 1 LS
6 Utility Potholing ( Odor Control Easement Areas and 1 LS Medians)
7 Utility Potholing ( Roadway Area) 1 LS
8 Record Drawing (" As - Built") Plans ( stipulated
1 LS 1, 500 1, 500
amount)

REMOVALS
9 Remove and dispose of existing 6" PCC curb 30 LF
and gutter
10 Remove and dispose of existing 4" stamped 300 SF
PCC center median
11 Remove and dispose of existing trench 1 LS
excavation AC pavement and base

EARTHWORK
12 Roadway trench excavation 15 CY
13 Roadway trench over excavation and crushed 5 CY
rock trench stabilization
27 06/24/2025
C10
38 of 352
Bid
Item
Description Of Work Qty. Unit Unit Price Item Total
14 Roadway trench backfill ( pipe zone and backfill 15 CY zone) installation
15 Roadway Class II aggregate base 5 CY
SEWER SYSTEM [ Specialty Item( s)]
16 Modify existing combination air vacuum valve 3 EA
assembly with dual air vacuum valve assembly
Modify existing combination air vacuum valve
17 assembly with a single combination air vacuum 2 EA
valve
18 Install new dual air vacuum valve assembly 1 EA
19 Install new single air vacuum valve assembly 1 EA
Modify Odor Control Unit No. 2 ( all Easement
20 piping area excavation, mechanical piping, 1 LS
pumps, appurtenances, installation and
backfill)
Modify Odor Control Unit No. 3 ( all Easement
21 area excavation, mechanical piping, 1 LS
appurtenances, installation and backfill)
Modify Odor Control Unit No. 2 air and drain
22 pipeline connections ( all Roadway area 1 LS
mechanical piping)
Modify Odor Control Unit No. 3 air and drain
23 pipeline connections ( all Roadway area 1 LS
mechanical piping)
24 Modify existing manhole and couple HDPE 11 EA
piping with spool and appurtenances
25 Modify existing manhole and couple HDPE 1 EA
piping with tee and appurtenances
26 Modify existing manhole and couple HDPE with 4 EA
reducer and appurtenances

DRY UTILITY UNDERGROUND
Supply and install pre -cast PCC vault with
27 access lid at Odor Control No. 2 ( including 1 LS
excavation, disposals, placement and backfill)
Supply and install pre -cast PCC vault with
28 access lid at Odor Control No. 3 ( including 1 LS
excavation, disposals, placement and backfill)
ELECTRICAL SYSTEM [ Specialty Item( s)]
06/24/2025
C10
39 of 352
Bid
Description Of Work Qty. Unit Unit Price Item Total
Item
Supply and install pressure isolation electrical
29 control sensor, components, conduits, wires for 1 LS Odor Control Unit No. 2

GENERAL SURFACE IMPROVEMENTS
Construct T-patch trench re -surfacing per City
30 of Carlsbad City stds. ( temporary only prior to 30 Ton final 2" grind and overlay, base course 3/ 4"
aggregate full depth to finish surface)
31 Construct 2" grind / AC overlay per City of 60 Ton
Carlsbad stds.
32 Construct 4" PCC curb and gutter per City of 100 LF
Carlsbad stds.
33 Construct 4" Stamped and center median
300 SF
colored concrete per City of Carlsbad stds.
34 Install final striping and signing per City of 1 LS
Carlsbad stds.

LANDSCAPE IMPROVEMENTS [ Specialty Item( s)]
Repair, replace, relocate existing median
35 irrigation system in conflict with appurtenance
1 LS 10, 000 10, 000
installation per City of Carlsbad stds.

Allowance item - force account work)
TOTAL BASE BID FOR IMPROVEMENTS ( in figures):

NOTE: Determination of the lowest bid shall be based solely on the lowest TOTAL BASE BID FOR IMPROVEMENTS. Unit prices shall prevail over extended total and grand total prices. Late bids will not be accepted.

Alternate Bid Items
Bid
Description Unit Qty. Unit Price Item Total
Item
A- 1 Remove and dispose of existing PCC sidewalk 32 SF
A- 2 Install PCC sidewalk per City of Carlsbad stds. 32 SF Modify existing air valve assembly with dualA- 3 1 EA
assembly behind sidewalk
29 06/24/2025
C10
40 of 352
A- 4 Modify existing air valve assembly with single 1 EA assembly behind sidewalk
A- 5 Install 4" thick 4' x8' PCC dual air valve pad 32 SF A- 6 Install 4" thick 4' x4' PCC single air valve pad 16 SF NOTE: Determination of the lowest bid shall be based solely on the lowest TOTAL BASE BID FOR IMPROVEMENTS and not the alternative bid items. Alternative Bid Items are to establish pricing for air vacuum relief valve relocations behind the existing northerly sidewalk of Palomar Airport Road on private property in lieu of proposed base bid relocations to the center median. Buena Sanitation District is seeking easements from private property owners in parallel with project bidding and prefers to construct air vacuum valves in the alternate locations behind the sidewalk if permitted through easement acquisition. Unit prices shall prevail over extended total and grand total prices. Late bids will not be accepted.
30 06/24/2025
C10
41 of 352

CONTRACTOR' S LICENSING STATEMENT
The undersigned is licensed in accordance with the laws of the State of California providing for the registration of Contractors.

Contractor' s License Number:

Contractor' s License Class:

Expiration Date:

As described in the INSTRUCTIONS FOR SIGNING BIDS, BONDS AND CONTRACTS, complete and sign the appropriate section for your company)
Name of Individual Contractor ( Print or type):

Signature of Contractor:

Business Address:
or
Name of Partnership or Joint Venture Firm:

Business
Ad d ress:

Signature, printed name, title and address of members signing on behalf of the partnership:

Signature: Name:

Title:

Address:

Signature: Name:

Title:

Ad d ress:
or
Name of Corporation:

Business Address:

Corporation organized under the laws of the State of
31 06/24/2025
C10
42 of 352
Signature of Officer of Corporation Printed Name and Title Signature of Officer of Corporation Printed Name and Title 32 06/24/2025
C10
43 of 352

PROJECT REFERENCES
The Bidder shall provide evidence that the Bidder has had the prior experience to properly perform in accordance with the terms of these Plans and Project Specifications.

List ALL contracts with public agencies entered within the past five ( 5) years of the most recent projects for which the Bidder has completed work of similar size and complexity to this project as the General or Prime) Contractor, and the names and phone numbers of the contracting public agencies. Make copies of this page for listing additional projects.

Project
No.

Date Completed Public Agency Name,
Contact Person & Phone
Project Name and Description
of Work
Contract Amount

1. 2.

3. 4.

5. 6.

7. 33
06/24/2025
C10
44 of 352
Note: Attached pre- printed list to this page to list additional projects. 34 06/24/2025
C10
45 of 352

CONTRACTOR' S LIST OF SUBCONTRACTORS
PROJECT NAME: EMERGENCY MODIFICATIONS - BUENA OUTFALL FORCEMAIN PHASE III PROJECT C. I. P. No. 8131)
NAME OF 111919121
In accordance with Division 2, Part 1, Chapter 4 of the Public Contract Code, the prime Contractor shall submit with its Bid a list of subcontractors who will perform work in excess of one- half of one percent ( 0.5%) of the prime Contractor' s total Bid or $ 10, 000, whichever is greater.

Subcontractors listed must be properly licensed for the type of work they are to perform, and their license numbers must be indicated below. Do not list alternate subcontractors for the same work.

Name under which
Subcontractor is
licensed
License
No. and
Class
Address of Office,
Mill or Shop
DBE
Yes/ No)
Bid
Item
No( s).

Description of
Subcontractor' s
Portion of Work
Dollar Value
of
Subcontract
35 06/24/2025
C10
46 of 352
Provide additional copies of this sheet if needed)
36 06/24/2025
C10
47 of 352

NON - COLLUSION DECLARATION
EMERGENCY MODIFICATIONS - BUENA OUTFALL FORCEMAIN PHASE III PROJECT ( C. I. P. No. 8131)

TO BE EXECUTED BY BIDDER AND SUBMITTED WITH BID
The undersigned declares:

I am the of the party making the
foregoing bid.

Title) ( Company Name)
The bid is not made in the interest of, or on behalf of, any undisclosed person, partnership, company, association, organization, or corporation. The bid is genuine and not collusive or sham. The bidder has not directly or indirectly induced or solicited any other bidder to put in a false or sham bid. The bidder has not directly or indirectly colluded, conspired, connived, or agreed with any bidder or anyone else to put in a sham bid, or to refrain from bidding. The bidder has not in any manner, directly or indirectly, sought by agreement, communication, or conference with anyone to fix the bid price of the bidder or any other bidder, or to fix any overhead, profit, or cost element of the bid price, or of that of any other bidder. All statements contained in the bid are true. The bidder has not, directly or indirectly, submitted his or her bid price or any breakdown thereof, or the contents thereof, or divulged information or data relative thereto, to any corporation, partnership, company, association, organization, bid depository, or to any member or agent thereof, to effectuate a collusive or sham bid, and has not paid, and will not pay, any person or entity for such purpose.

Any person executing this declaration on behalf of a bidder that is a corporation, partnership, joint venture, limited liability company, limited liability partnership, or any other entity, hereby represents that he or she has full power to execute, and does execute, this declaration on behalf of the bidder.

I declare under penalty of perjury under the laws of the State of California that the foregoing is true and correct and that this declaration is executed on
at
Date) ( City) ( State)
Signature
Printed Name
Title
37 06/24/2025
C10
48 of 352

BID SECURITY FORM

BID BOND
KNOW ALL PERSONS BY THESE PRESENTS that:

Bond No.:

The Buena Sanitation District (" District") has issued an invitation for bids for the work described as follows:

Work Description.

Name, address, and telephone number of Bidder)
the undersigned bidder (" Principal"), has submitted the accompanying bid to City for the work.

Bidders are required under the provisions of the Contract to furnish a form of bidder' s security with their bid.

NOW, THEREFORE, we, the undersigned Principal, and
Name, address, and telephone number of Surety)
Surety") a duly admitted surety insurer under the laws of the State of California, as Surety, are held and firmly bound unto District in the penal sum not less than ten percent ( 10%) of the total base bid amount, in lawful money of the United States of America, for the payment of which sum well and truly to be made, we bind ourselves, our heirs, executors, administrators, successors, and assigns, jointly and severally, firmly by these presents.

THE CONDITION OF THIS OBLIGATION IS SUCH THAT, if the hereby bounded Principal shall not withdraw said bid within the period specified in the bidding specification, or, if no period be specified, for ninety ( 90) calendar days after the bid opening; or if the Principal does not attempt to withdraw the bid when the requirements of Public Contract Code § 5101 et seq. are not met; or if the Principal is awarded a contract for the work by District and, within the time and in the manner required by the bidding specification , or if no period be specified, within ten ( 10) working days after the Contract is awarded, enters into the written form of contract included with bidding specification, furnishes the required bonds, one to guarantee faithful performance and the other to guarantee payment for labor and materials, and furnishes the required insurance coverages, then this obligation shall become null and void; otherwise, it shall be and remain in full force and effect.

In case suit is brought upon this bond, Surety further agrees to pay all court costs incurred by District in the suit and reasonable attorneys' fees in an amount fixed by the court.

Surety, for value received, hereby stipulates and agrees that no change, extension of time for award of a contract after opening of bids, alteration, addition, modification, or supplement to the terms of the bidding documents, the work to be performed thereunder, or the Contract Documents shall in any way affect Surety' s obligations under this Bond, and Surety does hereby waive notice of any such change, extension of time, alteration, addition, modification or supplement to the terms of said Bidding Documents, the Work to be performed thereunder, or the Contract Documents. Surety hereby waives the provisions of California Civil Code §§ 2819, 2845, and 2849. District is an intended beneficiary of this bond and has all rights of a party thereto.
06/24/2025
C10
49 of 352
Text and signatures continued on next page.]
w
06/24/2025
C10
50 of 352
IN WITNESS WHEREOF, this instrument has been duly executed by Principal and Surety, on the date set forth below, the name of each corporate party being hereto affixed, and these presents duly signed by its undersigned representative( s) pursuant to authority of its governing body.

Dated:

Principal"
By:

Signature
Name and Title
Surety"
By:

By: By:

Signature
Name and Titlev
Seal)
Signature
Name and Title
Signature
Name and Title
Seal)
This bond must be dated, all signatures must be notarized, and evidence of the authority of any person signing as attorney - in -fact must be attached.
40 06/24/2025
C10
51 of 352

CONSTRUCTION CONTRACT
THIS CONTRACT is made and entered into as of
Agreement Date"), by and between the Buena Sanitation District, a County Sanitation District Agency"), and Name, status (" Contractor"). District and Contractor are sometimes individually referred to as a "Party" and collectively as " Parties."
follows:

In consideration of the mutual covenants contained herein, Agency and Contractor agree as SECTION 1
The Contract Documents consisting of the PROJECT SPECIFICATIONS, comprised of the NOTICE INVITING BIDS, the INSTRUCTIONS TO BIDDERS, the accepted BID PROPOSAL; BID SCHEDULE; CONTRACTOR' S LICENSING STATEMENT; PROJECT REFERENCES; CONTRACTOR' S LIST OF SUBCONTRACTORS;; PUBLIC CONTRACT CODE STATEMENTS AND QUESTIONNAIRE; NON - COLLUSION AFFIDAVITS; the CONSTRUCTION CONTRACT, CONTRACTOR' S CERTIFICATE,

SUPPLEMENTARY GENERAL PROVISIONS, SUPPLEMENTARY TECHNICAL PROVISIONS, Special Provisions, Plans, Standard Plans and Specifications; together with all additions, deletions, modifications, appendices, and all addenda ( No. ?), as prepared prior to the date of bid opening setting forth any modifications or interpretations of any said documents, are hereby incorporated in and made a part of this Contract as fully as if set forth herein.

SECTION 2
For and in consideration of the payments and agreements to be made and performed by the Agency as set forth in said Contract Documents, the Contractor agrees with the Agency to construct Emergency Modifications — Buena Outfall Forcemain Phase III ( CIP No. 8131) as specifically set forth in documents entitled
Project Plans and Specifications for Emergency Modifications — Buena Outfall Forcemain Phase III ( CIP No. 8131)
for which award of the Contract was made, to furnish at his own proper cost and expense all plant, labor, services, materials, tools, equipment, supplies, transportation, utilities and all other items and facilities necessary therefore, as provided in the Contract Documents, and to do everything required therein. In accordance with the provisions of Section 3700 of the Labor Code, the Contractor will be required to secure the payment of Worker' s Compensation Insurance for its employees.

SECTION 3
For furnishing all said services and materials, payment of premiums on insurance policies, obtaining all permits and licenses of a temporary nature, furnishing and removing all plant, temporary work or structures, tools, and equipment, and for doing all the Work contemplated and embraced in this Contract, also for all loss and damage arising out of the nature of the aforesaid work during its progress or prior to acceptance from the action of the elements and from any unforeseen difficulties which may 41 06/24/2025
C10
52 of 352
arise or be encountered in the prosecution of the Work, and for all other risks of any description connected with the Work, also for all expenses incurred by or in consequence of the suspension or discontinuance of work, except such as in the said Contract Documents are expressly stipulated to be borne by the Agency, and for well and faithfully completing the Work and the whole thereof within the stipulated time and in the manner shown and described in the said documents, and in accordance with the requirements of the Engineer under them, the Agency will pay, and the Contractor shall receive in full compensation therefore, the prices set forth by him in the accepted bid. The total compensation will be computed on the basis of the units of work actually performed in accordance with the requirements of the Contract Documents and paid for at the stipulated prices named in the BID SCHEDULE for completion of the Work.

SECTION 4
The Agency hereby promises and agrees with the said Contractor to employ, and does hereby employ the said Contractor to provide the materials and to do the Work according to the terms and conditions herein contained and referred to, for the price aforesaid, and hereby contracts to pay the same at the time, in the manner, and upon the conditions set forth in the Contract Documents, and the Parties for themselves, their heirs, executors, administrators, successors and assigns do hereby agree to the full performance of the covenants herein contained.

SECTION 5
Contractor agrees to indemnify, defend, and save harmless, the Agency, its officers, agents, employees and volunteers from and against any and all claims, demands, damages, losses and expenses, defense costs including attorney fees, or liability of any kind or nature which the Agency, its officers, agents and employees may sustain or incur or which may be imposed upon them for injury to or death of persons, or damage to property as a result of, arising out of, or in any manner connected with the Contractor' s performance under the terms of this Contract, caused in whole or in part by any negligent or willful acts or omission of the Contractor, any subcontractor, anyone directly or indirectly employed by any of them or anyone for whose acts any of them may be liable, except where caused by the active negligence, sole negligence, or willful misconduct of the Agency.

Continued on page 3.1
42 06/24/2025
C10
53 of 352
SECTION 6
Contractor agrees that the Payment Bond and Performance Bond attached to/ submitted concurrently with this Contract are for reference purposes only, and shall not be considered a part of this Contract.

Contractor further agrees that said bonds are separate obligations of the Contractor and its surety, and that any attorneys' fee provision contained in any payment bond or performance bond shall not apply to this Contract. In the event there is any litigation between the Parties arising from the breach of this Contract, each Party will bear its own attorneys' fees in the litigation.

IN WITNESS WHEREOF, the Parties have caused this Agreement to be executed as of the Agreement Date.

BUENA SANITATION DISTRICT, a County NAME, status
Sanitation District
By:

JOHN B. FRANKLIN, CHAIRPERSON
By:

Name/ Title
ATTEST: By:

KATHY VALDEZ, CLERK OF THE BOARD
M
APPROVED AS TO FORM:

WALTER CHUNG, DISTRICT COUNSEL
By:

RISK MANAGEMENT REVIEW:

DOLORES GASCON, RISK MANAGER
By:
43 Name/ Title
06/24/2025
C10
54 of 352

FAITHFUL PERFORMANCE BOND
Bond No.

Premium: $
Effective Date:

PAYMENT BOND

LABOR AND MATERIALS)
LD; GP; DWG
APN
KNOW ALL PERSONS BY THESE PRESENTS that:

The Buena Sanitation District (" District") has awarded a contract ( the " Contract") to ThePrincipal (" Principal") as follows:

Emergency Modifications — Buena Outfall Forcemain Phase III ( CIP No. 8131) which Contract, and all Contract Documents set forth therein, are incorporated herein and made a part thereof by this reference.

Principal is required under the terms of the Contract and the California Civil Code to furnish a bond to secure the prompt, full, and faithful payment of any Claimant, as hereinafter defined, for all labor, materials or services used or reasonably required for use in the performance of the work, concurrently with delivery to District of the signed Contract.

NOW, THEREFORE, we, the undersigned Principal, and
Name, address, and telephone number of Surety)
Surety") a duly admitted surety insurer under the laws of the State of California, as Surety, are held and firmly bound unto District in the penal sum of Amount Dollars ($ xxx), this amount being not less than one hundred percent ( 100%) of the total contract price, in lawful money of the United States of America, for the payment of which sum well and truly to be made, we bind ourselves, our heirs, executors, administrators, successors, and assigns, jointly and severally, firmly by these presents.

THE CONDITION OF THIS OBLIGATION IS SUCH THAT, if the hereby bounded Principal, his, her or its heirs, executors, administrators, successors or assigns, or subcontractors shall fail to pay any of the persons named in Division 4, Part 6, Title 3 of the California Civil Code (§ 9000 et seq.), or any amounts due under the Unemployment Insurance Code with respect to work or labor performed under the Contract, or for any amounts required to be deducted, withheld, and paid over to the Employment Development Department from the wages of employees of Principal and subcontractors pursuant to Section 13020 of the Unemployment Insurance Code, with respect to work or labor performed under the Contract (" Claimants"), Surety will pay for the same in an amount not exceeding the penal sum specified in this bond; otherwise, this obligation shall become null and void.

This bond shall inure to the benefit of any of the persons named in Division 4, Part 6, Title 3 of the California Civil Code (§ 9000 et seq.), so as to give a right of action to such persons or their assigns in any suit brought upon the bond.

In case suit is brought upon this bond to enforce or interpret this bond' s terms, Surety further agrees to pay all court costs and reasonable attorneys' fees in an amount fixed by the court. Principal and Surety agree that this Performance Bond shall not be considered a part of the Contract but rather is a separate obligation of Principal and its Surety, and that any attorneys' fee provision contained in this Performance Bond shall not apply to the Contract. In the event there is any litigation between the parties arising from the breach of the Contract, each party will bear its own attorneys' fees in the litigation. 44 06/24/2025
C10
55 of 352
FURTHER, Surety, for value received, hereby stipulates and agrees that no change, extension of time, alteration, addition or modification to the terms of the Contract, or of the work to be performed thereunder, or the specifications for the same, shall in any way affect its obligations under this bond, and it does hereby waive notice of any such change, extension of time, alteration, addition, or modification to the terms of the Contract or to the work or to the specifications thereunder. Surety hereby waives the provisions of California Civil Code §§ 2819, 2845, and 2849. District is an intended beneficiary of this bond and has all rights of a party thereto.

IN WITNESS WHEREOF, this instrument has been duly executed by Principal and Surety, on the date set forth below, the name of each corporate party being hereto affixed and these presents duly signed by its undersigned representative( s) pursuant to authority of its governing body.

Dated:

Principal" "' Surety"

THEPRINCIPAL
By:

Signature
Name and Title
By:

Signature
By: Name and Title
Signature
Name and Title
By:

Seal)
Signature
Name and Title
Seal)
This bond must be dated, all signatures must be notarized, and evidence of the authority of any person signing as attorney - in fact must be attached.
45 06/24/2025
C10
56 of 352

PAYMENT BOND
Bond No.

Premium: $
Effective Date:

PAYMENT BOND

LABOR AND MATERIALS)
DWG 4505
KNOW ALL PERSONS BY THESE PRESENTS that:

The Buena Sanitation District (" District") has entered into a contract ( the " Contract") with ThePrincipal (" Principal") as follows:

Emergency Modifications — Buena Outfall Forcemain Phase III ( CIP No. 8131) which Contract, and all Contract Documents set forth therein, are incorporated herein and made a part thereof by this reference.

Principal is required under the terms of the Contract and the California Civil Code to furnish a bond to secure the prompt, full, and faithful payment of any Claimant, as hereinafter defined, for all labor, materials or services used or reasonably required for use in the performance of the work, concurrently with delivery to District of the signed Contract.

NOW, THEREFORE, we, the undersigned Principal, and
Name, address, and telephone number of Surety)
Surety") a duly admitted surety insurer under the laws of the State of California, as Surety, are held and firmly bound unto District in the penal sum of Amount Dollars ($ xxx), this amount being not less than one hundred percent ( 100%) of the total contract price, in lawful money of the United States of America, for the payment of which sum well and truly to be made, we bind ourselves, our heirs, executors, administrators, successors, and assigns, jointly and severally, firmly by these presents.

THE CONDITION OF THIS OBLIGATION IS SUCH THAT, if the hereby bounded Principal, his, her or its heirs, executors, administrators, successors or assigns, or subcontractors shall fail to pay any of the persons named in Division 4, Part 6, Title 3 of the California Civil Code (§ 9000 et seq.), or any amounts due under the Unemployment Insurance Code with respect to work or labor performed under the Contract, or for any amounts required to be deducted, withheld, and paid over to the Employment Development Department from the wages of employees of Principal and subcontractors pursuant to Section 13020 of the Unemployment Insurance Code, with respect to work or labor performed under the Contract (" Claimants"), Surety will pay for the same in an amount not exceeding the penal sum specified in this bond; otherwise, this obligation shall become null and void.

This bond shall inure to the benefit of any of the persons named in Division 4, Part 6, Title 3 of the California Civil Code (§ 9000 et seq.), so as to give a right of action to such persons or their assigns in any suit brought upon the bond.

In case suit is brought upon this bond to enforce or interpret this bond' s terms, Surety further agrees to pay all court costs and reasonable attorneys' fees in an amount fixed by the court. Principal and Surety agree that this Performance Bond shall not be considered a part of the Contract but rather is a separate obligation of Principal and its Surety, and that any attorneys' fee provision contained in this Performance Bond shall not apply to the Contract. In the event there is any litigation between the parties arising from the breach of the Contract, each party will bear its own attorneys' fees in the litigation. 46 06/24/2025
C10
57 of 352
FURTHER, Surety, for value received, hereby stipulates and agrees that no change, extension of time, alteration, addition or modification to the terms of the Contract, or of the work to be performed thereunder, or the specifications for the same, shall in any way affect its obligations under this bond, and it does hereby waive notice of any such change, extension of time, alteration, addition, or modification to the terms of the Contract or to the work or to the specifications thereunder. Surety hereby waives the provisions of California Civil Code §§ 2819, 2845, and 2849. District is an intended beneficiary of this bond and has all rights of a party thereto.

IN WITNESS WHEREOF, this instrument has been duly executed by Principal and Surety, on the date set forth below, the name of each corporate party being hereto affixed and these presents duly signed by its undersigned representative( s) pursuant to authority of its governing body.

Dated:

Principal" "' Surety"

THEPRINCIPAL
By:

Signature
Name and Title
By:

Signature
By: Name and Title
Signature
Name and Title
By:

Seal)
Signature
Name and Title
Seal)
This bond must be dated, all signatures must be notarized, and evidence of the authority of any person signing as attorney - in -fact must be attached.
47 06/24/2025
C10
58 of 352

CONTRACTOR' S CERTIFICATE
EMERGENCY MODIFICATIONS - BUENA OUTFALL FORCEMAIN PHASE III PROJECT ( C. I. P. No. 8131)

CONTRACTOR' S CERTIFICATE PURSUANT TO
SECTION 18610F THE LABOR CODE
I am aware of the provisions of Section 3700 of the Labor Code that requires every employer to be insured against liability for Worker' s Compensation or to undertake self- insurance in accordance with the provisions of that Code, and I will comply with such provisions before commencing the performance of the Work of this Contract.

Name of Contractor
By:

Signature
Printed Name
Title
Date
By:

Signature
Printed Name
Title
Date
06/24/2025
C10
59 of 352

NON - COLLUSION DECLARATION FOR SUBCONTRACTORS
EMERGENCY MODIFICATIONS - BUENA OUTFALL FORCEMAIN PHASE III PROJECT C. I. P. No. 8131

TO BE EXECUTED BY EACH AWARDEE OF A SUBCONTRACT
The undersigned declares:

I am the
Title)
of the party making the foregoing bid.

Company Name)
The bid is not made in the interest of, or on behalf of, any undisclosed person, partnership, company, association, organization, or corporation. The bid is genuine and not collusive or sham. The bidder has not directly or indirectly induced or solicited any other bidder to put in a false or sham bid. The bidder has not directly or indirectly colluded, conspired, connived, or agreed with any bidder or anyone else to put in a sham bid, or to refrain from bidding. The bidder has not in any manner, directly or indirectly, sought by agreement, communication, or conference with anyone to fix the bid price of the bidder or any other bidder, or to fix any overhead, profit, or cost element of the bid price, or of that of any other bidder. All statements contained in the bid are true. The bidder has not, directly or indirectly, submitted his or her bid price or any breakdown thereof, or the contents thereof, or divulged information or data relative thereto, to any corporation, partnership, company, association, organization, bid depository, or to any member or agent thereof, to effectuate a collusive or sham bid, and has not paid, and will not pay, any person or entity for such purpose.

Any person executing this declaration on behalf of a bidder that is a corporation, partnership, joint venture, limited liability company, limited liability partnership, or any other entity, hereby represents that he or she has full power to execute, and does execute, this declaration on behalf of the bidder. The provisions of this declaration shall not be held as disqualifying a person, firm or corporation who has submitted a sub -proposal to one bidder from submitting separate sub -proposals or quoting prices for materials or work to other bidders.

I declare under penalty of perjury under the laws of the State of California that the foregoing is true and correct and that this declaration is executed on
at
Date) ( City) ( State)
Signature
Printed Name
Title
49 06/24/2025
C10
60 of 352

SUPPLEMENTARY GENERAL PROVISIONS
EMERGENCY MODIFICATIONS - BUENA OUTFALL FORCEMAIN PHASE III PROJECT C. I. P. No. 8131 This section makes additions, deletions, or revisions to PART 1 - GENERAL PROVISIONS of the 2012 Standard Specifications for Public Works Construction (" Green book"). All sections and subsections which are not changed remain in full force and effect.

SECTION 1 - TERMS, DEFINITIONS,

ABBREVIATIONS, UNITS OF MEASURE AND SYMBOLS
1- 1 GENERAL.

Modify this subsection by adding the following:

The terms " as shown," " as indicated," or " as specified" are understood to be followed by the phrase " in the Contract Documents."
Working titles having masculine gender, such as " workman" and " journeyman" and the pronoun he," are used in the Specifications for the sake of brevity, and are intended to refer to persons of either gender.
1- 2 TERMS AND DEFINITIONS.

Modify the following terms and definitions to read:

Agency or City or Owner - The legal entity for which the Work is being performed, either the City of Vista, the Vista Community Development Commission, or the Buena Sanitation District.

Board - Where the word Board appears in the Standard Specifications, it shall mean the officer or body constituting the awarding authority of the Agency, either the City Council of the City of Vista, the Commission of the Vista Community Development Commission, or the Board of the Buena Sanitation District.

Special Provisions - Means the Supplementary General Provisions and Technical Provisions of the Project Specifications.

Standard Plans or Standard Drawings - Means the most recent editions of the Standard Drawings of the City of Vista and the San Diego Regional Standard Drawings ( SDRSD), unless otherwise noted.

The City of Vista Standard Drawings takes precedence over the San Diego Regional Standard Drawings.

Specifications or Standard Specifications - The Standard Specifications of the Agency are the latest edition of the Standard Specifications for Public Works Construction (" Green book"), as written and 50 06/24/2025
C10
61 of 352
promulgated by Public Works Standards, Inc., together with the most current Cumulative Supplement adopted by the Greenbook Committee of Public Works Standards, Inc. and along with the latest San Diego Regional Supplement to " Greenbook" as approved and adopted by the San Diego Regional Standards Committee.

The Standard Specifications set forth above will control the general provisions, construction materials, and construction methods for this contract, except as amended by the Plans, Special Provisions, or other Contract Documents. The Special Provisions are supplemental to the provisions of the Standard Specifications, unless otherwise noted. Only those sections requiring elaborations, amendments specifying options, additions or deletions are called out.

Working Day - Modify c) as follows:

The Agency recognizes ten ( 10) holidays on which no work is to be scheduled, as follows:

HOLIDAY OBSERVED ON
New Year' s Day January 1
Martin Luther Day, Jr. Day 3rd. Monday in January
President' s Day 3rd Monday in February
Memorial Day Last Monday in May
Independence Day July 4
Labor Day 1st. Monday in September
Veteran' s Day November 11
Thanksgiving Day 4th. Thursday in November
The day after Thanksgiving Friday after 4th. Thursday in November Christmas Day December 25
Add the following new terms and definitions:

Acceptance - Formal action of the Agency in determining that the Contactor' s Work has been completed in accordance with the Contract, filing a Notice of Completion with the County Recorder, which stipulates that date that the Work was completed, and notifying the Contractor in writing of the acceptability of the Work.

Award of Contract ( Award) - Date of - Date on which the Mayor or designee executes the Contract.

ASTM Designations - The latest revised Specifications or tentative Specifications of the American Society for Testing and Materials.

Best Management Practices ( BMPs) - ( a) A measure implemented to protect water quality and reduce the potential for pollution ( associated with storm water runoff); ( b) Any program, technology, process, siting criteria, operating method, measure, or device that controls, prevents, removes, or reduce pollution.

CA MUTCD - California Manual on Uniform Traffic Control Devices. 51 06/24/2025
C10
62 of 352
Certificate of Compliance - A written document signed and submitted by a supplier or manufacturer that certifies that the material or assembled material supplied to the Work site complies with the requirements of the Contract Documents.

Disadvantaged Business Enterprise ( DBE) - A for -profit " small business concern" that is at least fifty- one percent ( 51%) owned and controlled by one or more socially and economically disadvantaged individuals certified by the California Department of Transportation ( Caltrans).

Inspector - The engineering or technical personnel authorized to act as agents for the Engineer in the supervision of work covered by these Specifications, limited to the particular duties entrusted to them.

Main orTrunkline Facility - An Owner owned and maintained principal subsurface conduit that collects sewage or storm drainage, or distributes potable water.

Material and Labor Bond - The Payment Bond as defined in the Civil Code of California relating to Payment Bond for Public Works.

Notice of Completion ( NOC) - A document the Agency will file with the County Recorder, if in the Agency' s judgment, the Work has been completed. NOC stipulates the date that the Engineer accepted the Work. See California Civil Code section 3093.

Portable Emissions Unit - Any type of portable equipment which may discharge air contaminants into the atmosphere as stated in the San Diego County Air Pollution Control District Rules and Regulations.

Project - Means the total construction of all improvements located on the Site identified in the plan drawings and contractual documents.

Project Specifications - Comprised of the Notice Inviting Bids, the Instructions to Bidders, the BID documents, the Contract Documents, the Special Provisions, which include the Supplementary General Provisions and the Technical Provisions, permits issued by jurisdictional regulatory agencies, all appendices, the Standard Specifications, and all reference Specifications.

Punchlist - List of incomplete items of Work and of items of Work that are not in conformance with the Contract.
1-3 ABBREVATIONS.
1-3. 2 Common Usage.

Add the following:

AC............................................ Asphalt Concrete AT& T ........................................ Local and long distance telephone company ( formerly SBC and Pacific Bell)
CGP......................................... Construction General Permit CMP......................................... Corrugated Metal Pipe 52 06/24/2025
C10
63 of 352
LUP.......................................... Linear Underground / Overhead Project NCTD....................................... North County Transit District NEC ......................................... National Electrical Code OSHA....................................... Occupational Safety and Health Administration ( Department of Labor) PCR......................................... Point of curb return SWMP ..................................... Storm Water Management Plan VID........................................... Vista Irrigation District WPCP...................................... Water Pollution Control Plan WDID....................................... Waste Discharge Identification Number 1-3. 3 Institutions.

Add the following institutions:

APWA....................................... American Public Works Association SDRWQCB ............................... California Regional Water Quality Control Board, San Diego Region SECTION 2 - SCOPE AND CONTROL OF THE WORK
2- 1 AWARD AND EXECUTION OF CONTRACT.

Revise to read as follows:
2- 1 AWARD AND EXECUTION OF CONTRACT. Award and Execution of Contract shall be as provided for in the Project Specifications, Notice Inviting Bids, Instructions to Bidders, or the Specifications.

For projects with a value of $ 150, 000 and less, the City Manager is authorized to award the Contract and the Agency will send a " Notice of Intent to Award" to the Contractor accepting the Bidder' s proposal. Within ten ( 10) Working Days of the date of this notification, the Contractor shall submit the completed " Agreement and Bonds" portion of the Contract and the insurance certificates. The City Manager will then execute the Contract for the Agency.

For projects with a value greater than $ 150, 000, the City Council will award the Contract. The Agency will send a " Notice of Intent to Award" to the Contractor. Within ten ( 10) Working Days of the date of this notice, the Contractor shall submit the completed " Agreement and Bonds" portion of the Contract and the insurance certificates. After the City Council approves the Contract, the Mayor will execute the Contract for the Agency.

Add the following new subsections:
2- 1. 1 Integration.

Oral Modifications Ineffective. No oral order, objection, direction, claim or notice by any party or person shall affect or modify any of the terms or obligations contained in the Contract Documents. 53 06/24/2025
C10
64 of 352
2- 1. 2 Change in Name and Nature of Contactor' s Legal Entity.

Should a change be contemplated in the name or nature of the Contractor' s legal entity, the Contractor shall first notify the Agency in order that proper steps may be taken to have the change reflected on the Contract.
2- 2 ASSIGNMENT.

Add the following paragraph:

In accordance with Section 4551 of the Government Code, the Contractor and subcontractors shall conform to the following requirements. In entering into a public works contract or a subcontract to supply goods, services or materials pursuant to a public works contract, the Contractor or subcontractor offers and agrees to assign to the awarding body all rights, title and interest in and to all causes of action it may have under Section 4 of the Clayton Act ( 15 U.S.C. Sec. 15) or arising from purchases of goods, services or materials pursuant to the public works Contract or the subcontract.

This assignment shall be made and become effective at the time the awarding body tenders final payment to the Contractor, without further acknowledgment by the parties. 2- 5 PLANS AND SPECIFICATIONS.
2- 5. 1 General.

Add the following to the second paragraph in this subsection:

As shown on the Plans or described in the Specifications, each element of the Work must be furnished complete, finished and functional. Figured dimensions on drawings shall govern, but work not dimensioned shall be as directed. Work not particularly shown or specified shall be the same as similar parts that are shown or specified. Specifications shall govern as to materials, workmanship and installation procedures. The specification calling for the higher material or workmanship shall prevail.

In the event of any doubt or question arising respecting the true meaning of the specifications, reference shall be made to the representative of the owner of the facility affected by the work, whose decision shall be final.

Replace the last paragraph with the following:

If the Contractor, either commencing work or in the course of the work, finds any discrepancy between the Specifications and the Plans, or between either and the physical conditions at the site of the Work, or finds any error or omission in any of the Plans, or in any survey, the Contractor shall promptly notify the Engineer in writing of any discrepancy, error, or omission. No work shall be done in any area of such discrepancy until the Engineer has given approval for same in writing. The Contractor shall forward written Requests for Information ( RFIs) to the Engineer in all such matters.

Only written authorization from the Agency shall be binding over any deviation or changes in the Plans and Project Specifications. If the Contractor observes that any Plans or Specifications are at variance with any applicable law, ordinance, regulation, order or decree, the Contactor shall promptly notify the Engineer in writing of such conflict.
54 06/24/2025
C10
65 of 352
The Engineer on receipt of any such written notice will promptly investigate the circumstances and give appropriate instruction to the Contractor in writing. Until such instructions are given, any work done by the Contractor, either directly or indirectly, after the Contractor' s discovery of such error, discrepancy or conflict, shall be at the Contractor' s own risk, and the Contractor shall bear all costs arising therefrom.
2-5. 2 Precedence of the Contract Documents.

Add the following:

With reference to the Drawings, the order of precedence, from highest to lowest, shall be as follows:
a) Figures govern over scale dimensions. In the event of any discrepancy between any drawings and the figures thereon, the figures shall be taken as correct. b) Detail drawings govern over general drawings
c) Large scale details shall take precedence over smaller scale drawings as to shape and details of construction.
d) Work not particularly shown or specified shall be the same as similar work that is shown or specified.
e) Addenda or Change Order drawings govern over Contract Drawings f) Contract Drawings govern over Standard Drawings
g) Contract Drawings govern over Shop Drawings
The specifications contained in the Agency' s Supplementary Special Provisions ( General and Technical) take precedence over the specifications contained in the San Diego Regional Supplement to the Greenbook and the Greenbook. The specifications contained in the San Diego Regional Supplement to the Greenbook take precedence over the specifications contained in the Greenbook.

Should it appear that the Work to be done, or any of the matters relative thereto, are not sufficiently detailed or explained on the Contract Documents, or in the event of any doubt or question arising respecting the true meaning of the Specifications, the Contractor shall forward written Requests for Information ( RFIs) to the Engineer for such further explanation as may be necessary and the Engineer' s decision shall be final and binding.
2- 5. 3 Submittals.
2- 5. 3. 1 General.

Add the following to the end of the first paragraph:

Promptly after the Notice to Proceed has been received by the Contractor, the Contractor shall provide to the Engineer a complete list of names and addresses of all suppliers of materials to be used on the Work.

Revise the third paragraph as follows:
55 06/24/2025
C10
66 of 352
The Contractor shall allow a minimum of five ( 5) Working Days for review of shop drawings and submittals. Each set of shop drawings or submittals shall be accompanied by a letter of transmittal and the Contractor' s certification ( see description of certification below).

Add the following paragraphs after the last paragraph:

All submittals shall be submitted prior to the start of the Work unless otherwise approved by the Engineer. No work shall begin until the construction schedule has been approved by the Engineer.

The Contractor shall submit for Agency review and approval shop drawings and submittals for all long lead supplies, materials, and equipment within five ( 5) Working Days after the Notice to Proceed letter has been issued. The Contractor shall furnish the Engineer with a statement from the vendors) that the order( s) for said supplies, materials, and equipment has been received and accepted by said vendor( s) within fifteen ( 15) Working Days of said Notice to Proceed.

No work shall begin on the respective items of work that require a submittal until the submittals for those items of work have been approved in writing by the Engineer. When submitted for the Engineer' s review, shop drawings shall include the Contractor' s certification that the Contractor has reviewed, checked, and approved the shop drawings as conforming to the requirements of the Contract Documents. The following Contractor' s certification shall appear on all submittals:

It is hereby certified that the ( equipment, material) shown and marked in this submittal is that proposed to be incorporated into this Project, is in compliance with the Contract Documents, can be installed in the allocated spaces, and is submitted for review.

Certified by:

Printed name:

Title:

Date:

A copy of each shop drawing and each sample as reviewed by the Engineer shall be kept in good order by the Contractor at the site and shall be available to the engineer. A review fee of two hundred dollars ($ 200. 00) will be withheld from the Contractor' s progress payment for every re -submittal after the third time a submittal has been reviewed and rejected.

Submittals shall be mailed, emailed or delivered to the City of Vista Engineering Department listed below. Submittals by facsimile ( FAX) are not acceptable.

City of Vista
Engineering Department
200 Civic Center Drive
Vista, CA 92084- 6275
Email: kknatz@cityofvista. com
56 06/24/2025
C10
67 of 352
2- 5. 3. 2 Working Drawings.

Add the following to Table 2- 5. 3. 2 (A):

TABLE 2- 5. 3. 2 ( A) Note
Item Subsection Number Title Subject
16 306- 1. 2. 2 Pipe laying Pipeline shop drawings
Notes: 1. The diagrams shall be of a size and scale to show clearly all necessary details. Pipeline layouts, for reference only, may be submitted in tabulated form in increasing order of alignment stationing.

2. Pipeline layout diagrams or schedules required for approval shall be submitted in accordance with 2- 5. 3. Layout diagrams or schedules are required for pipelines using pipe materials conforming to the indicated subsections.

The diagrams or schedules will be submitted for reference only, but curve layouts are required for approval.

Revise the fourth paragraph to read:

Working Drawings listed above as Items 4 - 7, 9, 10 - 15 shall be prepared by a Civil or Structural Engineer registered by the State of California.
2- 5. 3. 3 Shop Drawings.

Add the following after the last paragraph:

The following procedures will apply to shop drawing submittals:
a) The Contractor shall submit to the Engineer for review five ( 5) copies of all shop drawings.

These drawings shall be complete, certified by the Contractor, and shall contain all required information in detail. The Contractor shall make any corrections to shop drawings required by the Engineer.
b) It is considered reasonable that the Contractor shall make a complete and acceptable submittal to the Engineer by the third submission of a submittal item. 1) If a submittal is returned to the Contractor marked " No exceptions taken," formal revision and resubmission of said submittal will not be required. 2) If a submittal is returned to the Contractor marked " Make corrections noted," formal revision and resubmission of said submittal will not be required. 3) If a submittal is returned to the Contractor marked " Amend - Resubmit," the Contractor shall revise said submittal and shall resubmit the required number of copies of the revised submittal to the Engineer.
4) If a submittal is returned to the Contractor marked " Rejected - Resubmit," the Contractor shall revise said submittal and shall resubmit the required number of copies of said revised submittal to the Engineer.
c) When reviewed by the Engineer, each copy of the drawings will be stamped and signed by the Engineer.
d) Two sets of said drawings will be returned to the Contractor. 57 06/24/2025
C10
68 of 352
e) The review of the drawings shall not be construed as a complete check, but will indicate only that the general method of construction and detailing is satisfactory. The Contractor shall assume all responsibility for accuracy of data, details, and dimensions shown in the submittals. f) The Contractor agrees that if deviations, discrepancies, or conflicts between shop drawing submittals and the Contract Documents in the form of Plans and Specifications, except as particularly noted within the submittal, are discovered either prior to or after shop drawings submittals are processed by the Engineer, the Plans and Specifications shall control and shall be followed.
g) Revisions indicated on shop drawings shall be considered as changes necessary to meet the requirements of the Contract Plans and Specifications and shall not be taken as the basis of claims for Extra Work. The Contractor shall have no claims for damages or extension of time due to any delay resulting from making required revisions to shop drawings. The review of said drawings by the Engineering will apply to general design only and will in no way relieve the Contractor of responsibility for errors or omissions contained therein nor will such review operate to waive or modify any provisions or requirements contained in these Contract Specifications or on the Contract Drawings.
h) The Contractor shall furnish to the Engineer eight ( 8) copies of instruction and maintenance manuals and parts lists of all major equipment furnished. Data in these manuals shall cover completely all items as specified and as supplied.
i) Shop fabrication drawings and lay sheets are required for all steel pipelines sixteen inches and greater in diameter ( 16"+ 0). The drawings and lay sheets shall fully illustrate horizontal station and vertical elevation of all joints and angle points, true angular deflection at locations of combined vertical and horizontal bends, and horizontal station for pipeline appurtenances. 2- 5. 3. 4 Supporting Information.

Add the following paragraphs:

Compliance certificates and weigh slips shall be provided for all fill material, aggregate base, asphalt concrete, Portland Cement Concrete, reinforcing steel, etc. The Contractor shall submit mix designs for asphalt concrete and Portland Cement Concrete to the Engineer for approval. All asphalt concrete and Portland Cement Concrete weigh slips ( delivery tickets) shall include the mix design and number or the actual weights of aggregate, sand, cement and water in each truckload. In addition, the Contractor must schedule a meeting and meet with the Engineer each working day to confirm the quantities of materials shown on the weigh slips. The Engineer shall approve any admixtures prior to use. The Contractor shall submit to the Engineer a certified mill test report for each heat or size of reinforcing steel.

The Contractor shall submit the names and addresses of all suppliers of mineral construction materials, and the mine from which the materials were obtained, along with a copy of the Office of Mine Reclamation AB 3098 List ( per California Assembly Bill 3098) showing that the mining operation is listed, prior to delivering any mineral construction materials to the Project site. This documentation regarding the Office of Mine Reclamation AB 3098 List ( per California Assembly Bill 3098) shall be made a part of every submittal required on the Project that includes mineral construction materials.

Failure to identify the supplier and the mine may result in rejection of the submittal. 06/24/2025
C10
69 of 352
2- 5. 4 Record Drawings (" As- Builts").

Add the following new subsection:
2- 5. 4 Record Drawings (" As- Builts"). It shall be the Contractor' s responsibility to keep and maintain, on the job site, a clean, accurate, full- size and legible print set of Project plans that indicate all changes in work, modifications and existing conditions that are different from what is shown on the Plans. The Contractor shall record the location, by stationing to nearest foot, and the depth, by elevation to the nearest tenth of a foot (+/- 0. 1'), of all underground utility facilities, including pipes, valves, plugged tees, capped ends, etc. The Contractor shall record, by dimension and / or scale drawings, all wiring, conduits and pull boxes as actually installed. All information necessary to maintain and / or service any concealed work shall be noted on the record drawings. The locations by station of sewer laterals and water services ( both perpendicular and skewed) to their mains must be noted on the record drawings. Records shall be kept up to date with all entries checked by the Engineer before the Work is buried or covered up. The Contractor shall make the Record Drawings available for review by the Engineer at any time.

Upon completion of the Work and prior to final acceptance, the complete set of Plans, marked up to show as - built conditions, shall be delivered to the Engineer for review. Full compensation for preparing, maintaining and providing Record Drawings (" As- Builts") shall be included in the stipulated lump sum price for this item of work. If no item is shown in the bid, then the Contractor shall include all costs in the various items of work.
2- 6 WORK TO BE DONE.

Add the following paragraphs:

The Contractor shall supervise and direct the Work, using the Contractor' s best skill and attention.

The Contractor shall be solely responsible for all construction means, methods, techniques, sequences and procedures relating to the Work, and shall coordinate all portions of the Work under the contract, including the relations of the various trades to the progress of the Work, in accordance with these provisions.

The Contractor shall be responsible to the Agency for the acts and omissions of the Contractor' s employees, subcontractors and their agents and employees, and any other persons performing any of the Work under a Contract with the Contractor.

Any plan or method suggested to the Contractor by the Engineer but not specified or required, if adopted or followed in whole or in part, shall be used at the risk and responsibility of the Contractor; and the City and the Engineer will assume no responsibility therefore.

Nothing in these specifications shall be interpreted to make the Contractor an agent of the Agency.

Unless otherwise provided in these specifications, the Contractor shall provide and pay for furnishing all labor, materials, equipment, tools, implements, construction equipment and machinery, methods or processes, water, heat, utilities, transportation, and other facilities, services and 06/24/2025
C10
70 of 352
incidentals necessary for the proper execution and completion of the Work, whether temporary or permanent and whether or not incorporated or to be incorporated in the Work. Contractor shall leave the construction site in a neat, clean, and orderly condition upon completion of the Work. 2- 7 SUBSURFACE DATA.

Add the following paragraph:

The Contractor shall investigate the existing geotechnical ( soil) conditions prior to submitting a bid, and shall satisfy himself as to the existing geotechnical ( soil) conditions, and include all costs to address those conditions in the bid.

Refer to the Appendix for available geotechnical information along the pipeline alignment. 2- 8 RIGHT- OF- WAY.

Add the following paragraphs:

The Contractor shall not allow his employees to use private property for any reason or to use water or electricity from such property without written permission from the owner. The Contractor shall provide evidence of such permission in writing to the Engineer before entering upon such lands. In performing any work or doing any activity on lands outside the public rights -of -way, the Contractor shall comply with all applicable Federal, state and local laws, ordinances, codes and regulations. The Contractor shall indemnify and hold the Agency, its officials, officers, employees, and agents free and harmless from all claims or suits for damages occasioned by such work or activity, whether done according to this subsection and with permission from the owner or in violations of this subsection without permission from the owner.

For all projects the Contractor shall be fully responsible for locating and obtaining permission to use construction storage area( s) and stockpile site( s) in addition to staging areas provided by the Agency. Where the Contractor may find it advantageous to use private property, it shall arrange for its use. The Contractor shall assume full responsibility for its rental, preparation, maintenance and cleanup in a manner satisfactory to the Agency and the property owner. 2- 9 SURVEYING.
2- 9. 1 Permanent Survey Markers.

Delete the first paragraph and replace with the following paragraphs:
2- 9. 1 Permanent Survey Markers. The Contractor shall notify the Engineer and the Professional Land Surveyor or Registered Civil Engineer authorized to practice land surveying in the State of California (" Surveyor") performing construction staking at least five ( 5) Working Days before starting work to allow for the preservation of reference points, survey monuments, lot stakes ( tagged), benchmarks and other survey points.
06/24/2025
C10
71 of 352
In accordance with the Professional Land Surveyors Act ( State of California Business and Professions Code 8771( a), ( b) and 8773. 2 ( as amended by California Senate Bill 1563), the Surveyor performing construction staking for the Project shall file in the Office of the County Surveyor a Corner Record form or Record of Survey prior to the completion of construction for the replacement of survey monuments. The Contractor shall not disturb survey monuments, lot stakes ( tagged), or benchmarks without the consent of the Engineer, and in the case of willful or careless destruction, shall be liable for and charged with the cost of their replacement and of any expenses resulting from their unnecessary loss. Replacement shall be done only under the direction of the Engineer by a Register Land Surveyor or a Register Civil engineer authorized to practice land surveying within the State of California.

Upon submittal of all Corner Record forms or Records of Survey to the San Diego County Surveyor' s office, the Surveyor performing construction staking for the Project shall submit copies of the same records to the Agency. Upon acceptance and approval by the San Diego County Surveyor' s office, the Surveyor shall also submit Corner Record forms or Records of Survey ( Mylar) copies of the same records to the Agency prior to completion of the Project. 2- 9. 2 Survey Service.

Delete all three paragraphs and replace with the following:

All survey monuments, centerline ties and survey reference points shall be protected in place or reestablished where disturbed, in accordance with Section 8771 of the Professional Land Surveyor' s Act ( Business & Professions Code Section 8700 et seq.), prior to Project acceptance. 2- 9. 4 Line and Grade.

Replace the first and second paragraphs with the following:

All work, including finished surfaces, shall during its progress and upon completion conform to the lines, grades, cross -sections, elevations and dimensions shown on the Plans. All distances and measurements are given thereon and will be made in a horizontal plane. Three ( 3) consecutive points shown on the same rate of slope must be used in common in order to detect any variation from a straight line. In the event any discrepancy exists, it must be reported to the Engineer. Failure to make this report shall make the Contractor responsible for any error in the finished work. Minor deviations from approved Plans, whenever required by the exigencies of construction, shall be determined in all cases by the Engineer and authorized in writing.

Add the following paragraphs and table:

The Professional Land Surveyor or Registered Civil Engineer authorized to practice land surveying in the State of California (" Surveyor") performing construction staking will furnish construction stakes to prosecute the Work as part of the various items of work. Surveying and staking shall be performed using survey equipment and methods appropriate for the Work. For grades equal to or less than one- half percent ( 0. 5%), elevations for staking shall be established by differential leveling. The Surveyor 61 06/24/2025
C10
72 of 352
performing construction staking for the Project shall provide the following stakes as needed to complete the Work:

STAKE TYPE STAKE REQUIREMENTS
Clearing and Grubbing Show limits of Work at fifty foot ( 50') maximum intervals and at angle points
Slope Show rough grading for slopes at fiftyfoot ( 50') maximum intervals as needed for construction
Rough Grade Show rough grading for road subgrade on centerline at fifty foot 50') maximum intervals and on slopes as needed to achieve cut or fill to finished grade as indicated on a grade sheet Drainage Structure Two ( 2) front corners with line stakes with ten foot ( 10') maximum offset, invert elevations in and out, and information for top of structure elevation
Pipelines ( storm drain, At twenty- five foot ( 25') maximum intervals for invert elevation or sewer, water, etc.) top of pipe; also at change of alignment or grade Sewer and Storm Centerline, invert elevations in and out, and top of rim Drain Manholes
Road Base Establish finish base grade at centerline of street and intersections, provide " blue tops" at fifty foot ( 50') maximum on centerline of street and at ten to fifteen foot ( 10' - 15') grid within intersections
Finish Asphalt Grade At twenty- five foot ( 25') maximum intervals for irregular asphalt cuts and fills to set leveling surfaces and at ten to fifteen foot ( 10' 15') grid within intersections with additional stakes for landings at the bottom of curb ramps
Curb and Gutter At twenty- five foot ( 25') maximum intervals and at the top of driveway entrance wings
Curb Return At each quarter ( 1/ 4) delta with a stake at the curb return radius point
Curb Ramp Top and bottom of curb transitions, lip of depressed gutter, finished surface at four ( 4) corners of top landing, & transitions Driveway Centerline and wings ( join lines if matching to existing) Street Light and Traffic Five to seven foot ( 5' - 7') maximum offset showing centerline of Signal poles poles
The Surveyor performing construction control surveying / staking shall provide one ( 1) copy of all grade sheets to the Engineer.

The cost to reset construction survey stakes lost or destroyed during construction operations shall be borne by the Contractor.
2- 9. 5 Payment.

Add the following new subsection:
62 06/24/2025
C10
73 of 352
2-9. 5 Payment. The Professional Land Surveyor or Registered Civil Engineer authorized to practice land surveying in the State of California ( Land Surveyor) performing construction control surveying/ staking will furnish construction stakes to prosecute the Work, and no compensation will be made to the Contractor for delays to the Work caused by the Contractor' s lack of coordination with the Agency to schedule Construction Staking. Payment for all Work necessary for preserving, documenting, and re-establishing existing survey monuments, as specified, will be as shown in the bid, and no additional compensation will be allowed. The cost to reset stakes lost or destroyed during construction operations shall be borne by the Contractor. Payment for providing construction staking on the Project will be made by the Agency directly to the Land Surveyor under contract with the Agency. 2- 11 INSPECTION.

Delete the second sentence in its entirety. Add the following paragraphs to the end of this subsection:

All work which is defective and has been rejected shall be remedied, or removed and replaced and made good by the Contractor in an acceptable manner. Unsuitable materials may be rejected notwithstanding the fact that such unsuitable materials have been previously overlooked by the engineer and accepted.

No additional compensation will be allowed to the Contractor for the removal and replacement of remedial or defective work, or unsuitable materials.

Any work done beyond the lines and grades shown on the Plans or established by the Engineer, or any Extra Work done without written notice by the Engineer, will be considered as unauthorized work and will not be paid for. Upon order of the Engineer unauthorized work shall be remedied, removed or replaced at the Contractor' s expense.

Upon failure of the Contractor to comply promptly with any order of the Engineer made under Subsection 2- 11 (" INSPECTION."), the Agency may cause rejected or unauthorized work to be remedied, removed or replaced, and to deduct the costs from any monies due or to become due to the Contractor.

The Contractor shall notify the Agency at least twenty- four ( 24) hours in advance of the time required for the inspection of any Work which will be covered or which will require special inspection procedures.

The Agency will pay for costs of inspection and materials testing, sufficient to verify the quality of the Contractor' s work. Any retesting of failing areas, or costs due to the Contractor' s failure to be ready for inspections requested by the Contractor, shall be paid for by the Contractor.

If the Contractor elects to work under this Contract more than eight ( 8) hours a day or more than forty ( 40) hours in a week, Saturday, Sunday or Agency holidays, unless otherwise specified, he shall arrange with the Engineer for the required inspection service and pay the Overtime Inspection Fees which will be charged at the following rates:

NUMBER OF OVERTIME HOURS COST
4 hours or less per day 375. 00
4 to 8 hours per day 750. 00
When Overtime Inspection is required, the Contractor shall notify the Agency and pay inspection fees twenty- four ( 24) hours in advance. If the Contractor is directed by the Agency to work under this Contract 63 06/24/2025
C10
74 of 352
more than eight ( 8) hours a day or more than forty ( 40) hours a week, the Special Inspection fee requirements will be waived.

The Contractor shall notify the Engineer of the completion of the Work and the Engineer will make an inspection of the Work. The Engineer will not make the final inspection until the Work provided for and contemplated by the Contractor has been completed and the final clean up performed. The Contractor may be present at the final inspection. The Contractor will be notified in writing of any defects or deficiencies to be remedied. When notified that corrective work is completed, the Engineer will again inspect the Work and when the Engineer is satisfied that all work has been done in accordance with the Plans and Specifications, the Engineer will recommend that the Work be formally accepted. 2- 11. 1 Inspection by Other Jurisdictions.

Add the following new subsection:
2- 11. 1 Inspection by Other Jurisdictions. Whenever any part of the Work to be performed is under the jurisdiction or control of, or is to be paid for, in whole or in part, by another public agency, entity, or jurisdiction, including but not limited to another city, Vista Irrigation District, North County Transit District, the County of San Diego, the State of California, or the United States Government, such Work, in addition to Agency inspection, shall be subject to inspection and approval by the proper officials of such entities or jurisdictions.

Add the following new subsections:
2- 13 SITE EXAMINATION.
2- 13 SITE EXAMINATION. The Contractor shall have the sole responsibility of satisfying itself concerning the nature and location of the Work, and the general and location conditions, such as, but not limited to, all other matters which could in any way affect the Work or the costs thereof. The failure of the Contractor to acquaint itself with all available information regarding any applicable existing or future conditions shall not relieve it from the responsibility for properly estimating the difficulties, responsibilities, or costs of successfully performing the Work according to the Contract Documents. 2- 14 FLOW AND ACCEPTANCE OF WATER.
2- 14 FLOW AND ACCEPTANCE OF WATER. Storm, surface, nuisance, or other waters may be encountered at various times during construction of the Work. Therefore, the Contractor, by submitting a Bid, hereby acknowledges that it has investigated the risk arising from such waters, has prepared its Bid accordingly, and assumes any and all risks and liabilities arising there from. 2- 15 NOTICE OF THIRD PARTY CLAIMS.
2- 15 NOTICE OF THIRD PARTY CLAIMS. Pursuant to Public Contract Code Section 9201, the Agency will provide Contractor with timely notification of the receipt of any third - party claim relating to the Contract. Contractor shall attempt to verify and resolve claims promptly. 06/24/2025
C10
75 of 352
2- 16 SEPARATE CONTRACTS.
2- 16 SEPARATE CONTRACTS. The Agency reserves the right to let other contracts in connection with this Work or on the Project site. Contractor shall permit other contractors reasonable access and storage of their materials and execution of their work and shall properly connect and coordinate its Work with theirs.

To ensure proper execution of its subsequent Work, Contractor shall immediately inspect work already in place and shall at once report to the Engineer any problems with the work in place or discrepancies with the Contract Documents.

Contractor shall ascertain to its own satisfaction the scope of the Project and nature of any other contracts that have been or may be awarded by the Agency in prosecution of the Project to the end that Contractor may perform this Contract in the light of such other contracts, if any. Nothing herein contained shall be interpreted as granting to Contractor exclusive occupancy at site of the Project.

Contractor shall not cause any unnecessary hindrance or delay to any other contractor working on the Project. If simultaneous execution of any Contract for the Project is likely to cause interference with performance of some other contract or contracts, the Engineer will decide which Contractor shall cease Work temporarily and which contractor shall continue or whether work can be coordinated so that contractors may proceed simultaneously. The Agency shall not be responsible for any damages suffered or for extra costs incurred by Contractor resulting directly or indirectly from award, performance, or attempted performance of any other contract or contracts on the Project site.

SECTION 3 - CHANGES IN WORK
3- 1 CHANGES REQUESTED BY THE CONTRACTOR.
3- 1. 1 General.

Add the following to this subsection after the last sentence:

The Contractor shall give written notice of a proposed Change Order required for compliance with the Contract Documents within seven ( 7) Working Days of discovery of the facts giving rise to the proposed Change Order.

Add the following new subsection:
3- 1. 3 Cost Reduction Proposal.
3- 1.3 Cost Reduction Proposal. The Contractor may submit to the engineer in writing, proposals for modifying the Plans, Specifications, or other requirements of the Contract for the sole purpose of reducing the total cost of construction.

The cost reduction proposal must not impair, in any manner, the essential functions or characteristics of the Project such as service life, economy of operation, ease of maintenance, desired appearance, or design and safety standards.
65 06/24/2025
C10
76 of 352
The Contractor shall include the following information in the cost reduction proposal:
a) A description of both the existing Contract requirements for performing the work and the proposed changes.
b) An itemization of the Contract requirements that must be changed if the proposal is adopted. c) A detailed estimate of the cost of performing the work under the existing Contract and under the proposed change.
d) A statement of the time within which the engineer must make a decision thereon. e) The Contract items of Work affected by the proposed changes, including any quantity variation attributable thereto.

These provisions of this subsection do not require the Engineer to consider any cost reduction proposal which may be submitted hereunder; nor will the Agency be liable to the Contractor for failure to accept or act upon any cost reduction proposal the Contractor has submitted pursuant to this subsection, nor for any delays to the Work attributable to any such proposal.

If a cost reduction proposal is similar to the information included in the Contract Documents or adopted by the Agency after the advertisement for the Contract, the Engineer will not accept such proposal and reserves the right to make such changes without compensation to the Contractor under the provisions of this subsection.

The Contractor must continue to perform the Work in accordance with the requirements of the Contract until a Change Order, incorporating the cost reduction proposal has been issued. If a Change Order has not been issued by the date upon which the Contractor' s cost reduction proposal specified that a decision thereon should be made, or such other date as the Contractor may subsequently have specified in writing, such cost reduction proposal must be deemed rejected.

The Engineer is the sole judge of the acceptability of a cost reduction proposal and the estimated net savings. In determining the estimated net savings, the Agency has the right to disregard the Contract Bid prices if, in the judgment of the Engineer, such prices do not represent fair measure of the value of the work to be performed or to be deleted.

The Agency reserves the right, where it deems such action appropriate, to require the Contractor to share in the Agency' s costs of investigating the Contractor' s cost reduction proposal as a condition of considering such proposal. Where such a condition is imposed, the Contractor shall indicate his acceptance in writing allowing the Agency to deduct amounts payable to the Contractor for any monies due or that may become due to the Contractor under the Contract.

If the Engineer accepts your cost reduction proposal in whole or in part, the Engineer will issue a Change Order to incorporate the changes in the Plans and Specifications which are necessary to permit the cost reduction proposal, or such part of it as has been acceptable to be put into effect. If the Engineer' s approval is conditional, the Change Order will include any conditions upon which the Engineer' s approval is based.

The Change Order shall also include the estimated net savings in the cost of performing the Work due to the accepted cost reduction proposal and provides that the Contract cost be adjusted by crediting the Agency with fifty percent ( 50%) of estimated net savings amount. 06/24/2025
C10
77 of 352
The Contract time will not be extended by the acceptance of the cost reduction proposal and performance of the Work unless specified otherwise in the Change Order.

The amount specified as payable to the Contractor in the Change Order is full compensation for the cost reduction proposal and the performance of the Work.

The Agency expressly reserves the right to adopt a cost reduction proposal for general use on contracts administered by the Agency when it determines that said proposal is suitable for application to other contracts. When an accepted cost reduction proposal is adopted for general use, only the Contractor who first submitted such proposal will be eligible for compensation subject to this subsection, and in that case, only for contracts awarded prior to submission of the accepted cost reduction proposal.

The cost reduction proposals identical or similar to previously submitted proposals will be eligible for consideration and compensation under the provisions of this subsection, if the identical or similar, previously submitted proposal were not adopted for general application to other contracts administered by the Agency.

Subject to the provisions contained herein, the Agency must have the right to use all or any part of any submitted cost reduction proposal without obligation or compensation of any kind to the Contractor.

The Contractor must bear all costs to revise bonds for the Project to include the cost reduction incentive proposal Work.
3- 2 CHANGES INITIATED BY THE AGENCY.
3- 2. 1 General.

Add the following after the last paragraph:

Contractor shall not be entitled to claim or bring suit for damages, whether for loss of profits or otherwise, on account of any change resulting in a decrease or omission of any item or portion of work to be done. Whenever any change is made as provided for herein, such change shall be considered and treated as though originally included in the Contract, and shall be subject to all terms, conditions and provisions of the original Contract.
3- 2. 4 Agreed Prices.

Add the following to this subsection after the first sentence:

Agreed prices shall be negotiated before commencement of the Work. 3- 3 EXTRA WORK.
3- 3. 1 General.
67 06/24/2025
C10
78 of 352
Add the following to the first paragraph:

Any Extra Work performed by the Contactor without an approved Contract Change Order from the engineer shall be at the Contractor' s risk and the Contractor shall not be entitled to payment without an approved Change Order. All Extra work shall be adjusted daily upon report sheets furnished by the Contractor, reviewed by the Engineer and signed by both parties. The daily report shall be considered thereafter as the true record of Extra Work done. New and unforeseen work will be classed as Extra Work only when said work is not covered and cannot be paid for under any of the various items or combination of items for which a bid price appears in the Bid Forms.

Add the following:

The Agency reserves the right to direct the Contractor to solicit competitive Bids for Extra work. If required by the Engineer, you must obtain competitive Bids from Subcontractor acceptable to the Contractor and must deliver such Bids to the Engineer who will then determine which Bids will be accepted.

Any request by the Contractor to change the Contract Price to include the price of Extra Work must be by written notice to the Engineer and must include itemized estimates. The Contractor' s itemized estimates must detail all applicable elements of price ( e. g. labor and payroll costs, quantities, crew composition, production rates, material costs, Subcontractor and Supplier costs, equipment costs, and supplemental costs).

If the Contractor' s request to change the Contract Price arises from changes in the Schedule affecting all or part of the Project, or if the Contractor seeks a change in the Contract time, the Contractor' s request must include the analysis require by Subsection 6- 1 ("CONSTRUCTION SCHEDULE AND COMMENCEMENT OF THE WORK.").
3- 3. 2 Payment.
3- 3. 2. 1 General.

Replace the first sentence with the following.
3- 3. 2. 1 General. When the cost and time for Extra Work cannot be agreed upon prior to the commencement of the Work, the Agency will pay for Extra Work based on the accumulation of costs as provided herein and grant additional time to the Contract duration. Extra Work shall be paid for under a written Change Order, approved by the Agency, in accordance with the terms therein provided.

Generally, payment for Extra Work will be made at the unit price or lump sum previously agreed upon between the Contractor and the Agency.
3- 3. 2. 2. 3 Tools and Equipment Rental.

Replace the second paragraph in its entirety with the following:

I
06/24/2025
C10
79 of 352
Regardless of ownership, the rates to be used in determining equipment rental costs shall not exceed most current listed rates found in the Caltrans Labor Surcharge and Equipment Rental Rates, which is available online at:
http:// www. dot. ca. gov/ hq/ construc/ equipmnt. html Add the following new paragraphs:

Where the Contractor can substantiate thatthe rental rates prevailing locally exceed the published rate by more than fifteen percent ( 15%), the Contractor will be entitled to a rental rate adjustment.

For equipment not listed in said publication, rental rates must not exceed listed rates prevailing locally at equipment rental agencies or distributors, at the time the Work is performed.

Whenever possible, Extra work must be accomplished using equipment available on Site or owned by the Contractor. If a specific piece of equipment must be rented to be used exclusively for the Extra Work, the rental rate will be the invoiced rate.
3- 3. 2. 3 Markup.
3- 3. 2. 3. 1 Work by Contractor.

Replace the entire paragraph with the following.
3-3. 2. 3. 1 Work by Contractor: The following allowable overhead and profit percentages shown in Table 3-3. 2. 3. 1(A) below shall be added to the Contractor' s costs and shall constitute the markup for all overhead, insurance, and profits on work performed by the Contractor:

Table 3- 3. 2. 3. 1( A)

COMPONENT OVERHEAD PROFIT
Labor 10% 10%
Materials 10% 5%
Equipment Rental 10% 5%
Other Items and Expenditures 10% 5%
Regardless of the number of hierarchical tiers of Subcontractors, the five percent ( 5%) which is the Contractor' s allowance 3. 5% ( for overhead) and 1. 5% ( for profit) may be applied one time only to the performing Subcontractor' s total cost.

One percent ( 1%) shall be added to the sum of the costs and markups provided for in the subsection as compensation for bonding.
3- 3. 2. 3. 2 Work by Subcontractor.

Replace the entire paragraph with the following.
06/24/2025
C10
80 of 352
3-3. 2. 3. 2 Work by Subcontractor: When all or any part of the Extra Work is performed by a Subcontractor, the markup established in 3-3. 2. 3. 1 shall be applied to the Subcontractor' s actual cost of such work. A markup of ten percent ( 10%) on the first Five - Thousand Dollars ($ 5, 000) of the subcontracted portion of the Extra Work and a markup of five percent ( 5%) on work added in excess of Five - Thousand dollars ($ 5, 000) of the subcontracted portion of the Extra Work may be added by the Contractor.

The markups specified in Subsections 3- 3. 2. 3. 1 (" Work by Contractor.") and 3-3. 2. 3. 2 (" Work by Subcontractor.") shall be considered as full compensation and include, but not be limited to, the Contractor' s labor costs for personnel not working directly on the Extra Work, including the cost of administration and any tools or equipment that they may use. Such costs shall not be reported as labor or equipment costs elsewhere except when they are actually used in the performance of the Extra Work. Labor costs shall in that case be reported for the labor classification corresponding to the type and nature of Extra Work performed.
3- 3. 3 Daily Reports by Contractor.

Add the following as the first sentence:

The Contractor shall notify the Engineer at the beginning of each working day when Extra Work is in progress.

SECTION 4 - CONTROL OF MATERIALS
4- 1 MATERIALS AND WORKMANSHIP.
4- 1. 1 General.

Replace the subsection in its entirety with the following:
4- 1. 1 General. It is the intent of the Agency in drafting the Contract Documents to accept only first class work, materials, parts, equipment and workmanship. All materials, parts and equipment furnished by Contractor for the Work shall be new, high grade, free from defects, of specified kind and fully equal to samples when such samples are required. Used or secondhand materials, parts and equipment may be used only if permitted by the Specifications. When the quality or kind of material or articles required under the Contract are not particularly specified, the Contractor shall provide those representing the best of their class or kind. Quality of work shall be in strict accordance with generally accepted standards. Materials, parts and equipment shall be furnished in such quantities, kinds and at such times as to ensure uninterrupted progress of the Work.

The quality of material, parts, equipment and work shall be subject to approval by the Engineer.

The Engineer shall have access to the Work at all times during construction, and shall be furnished with every reasonable facility for securing full knowledge with regard to the progress, workmanship and character of the materials, parts and equipment used or employed in the Work. Materials and workmanship of a quality not conformingto the requirements of the Specifications shall be considered defective, and shall be subject to rejection. Defective work or material, whether in place or not, shall 70 06/24/2025
C10
81 of 352
be remedied or removed and replaced by the Contractor, at its expense, and defective materials shall be removed from the Work site immediately, at the Contractor' s expense, when so directed by the Engineer.

Any work done beyond the lines shown on the Plans or established by the Engineer, or any Extra Work done without written authority, will be considered unauthorized and will not be paid for by Agency.

Upon Contractor' s failure to comply promptly with any order of the Engineer made under the provisions of this Section, the Engineer shall have authority to cause such defective or unauthorized work to be remedied or removed and replaced, and to deduct the costs thereof from any monies due or to become due the Contractor. If the Work is found to be in compliance with these Specifications, the Engineer will furnish the Contractor with a certificate to that effect.

No rejected materials, the defects of which have been subsequently corrected, shall be used until approval in writing has been given by the Engineer. Upon failure of the Contractor to comply with any order of the Engineer made under the provisions of this subsection, the Engineer shall have the authority to remove and replace defective materials and to deduct the cost of removal and replacement from any monies due or to become due the Contractor.

If, during the prosecution of the work, the Contractor fails to immediately correct the defective or non -conforming work upon notice, or fails to correct the defective or non -conforming work in a manner conforming to the Contract Documents, the Engineer may order the Contractor to stop all or part of the Project. The Agency' s right to stop the Project does not give rise to any duty on the Agency' s part to stop Work for the Contractor' s benefit or the benefit of any other party. The Contractor shall bear all direct and indirect costs and damages that result from the Agency' s stop work notice.

When removing asbestos products, the Contractor shall comply with the requirements of Title 8, CCR, General Industry Safety Orders and Construction Safety Orders. 4- 1. 1. 1Agency -furnished Materials. The Agency may provide certain items ( e.g. traffic signal poles, mast arms, meter pedestals, street lights, etc.) for use by the Contractor for this Project at no cost to the Contractor as described in the Special Provisions. The Contractor shall inspect the materials / equipment prior to submitting a bid and shall satisfy himself of the suitability of the materials / equipment for use on the Project, and include all costs in the bid. The Contractor shall provide all hardware and any other materials, equipment and appurtenances necessary to use the Agency - furnished items in the Work.

Upon written request from the Contractor at least twenty- four ( 24) hours in advance, any materials equipment furnished by the Agency for the Project shaII be available to the Contractor to take delivery of the items during regular Public Works Department Working Hours at the Agency' s Public Works Yard at 1165 E. Taylor Street or the Agency' s Storage Yard at 2430 Lupine Hills Drive as designated by the Agency. The Contractor shall inspect the materials / equipment at time of pick- up and shall satisfy himself of the suitability and quantity of the materials / equipment for use on the Project. The Contractor shall provide loading at the Agency' s designated location, handling, transportation and delivery of the items to the Project site. The cost of handling and placing all materials / equipment after they are made available to the Contractor shall be considered as included in the Contract prices for items in connection with which they are used. No markup shall be applied to any material provided by the Agency.
71 06/24/2025
C10
82 of 352
The Contractor shall assume full responsibility for all Agency -furnished materials and/ or equipment made available to him as soon as loading commences. Deductions will be made from any monies due to the Contractor to make good any shortages and deficiencies, from any cause whatsoever, which may occur after said materials and/ or equipment have been furnished to the Contractor.
4- 1. 3 Inspection Requirements.
4- 1. 3. 1 General.

Revise the first paragraph to read as follows:
4- 1.3. 1 General. Unless otherwise specified in these Specifications, inspection may be required at the source for such typical materials and fabricated items including, but not limited to, bituminous paving mixtures, structural concrete, precast concrete, street lighting poles, metal fabrication, metal casting, welding, concrete pipe manufacture, protective coating application, plastic liner, fiberglass tanks, plastic liner pipe, and similar shop or plant operations.

Revise third sentence of the second paragraph to read as follows:

Special items of equipment such as designed electrical panel boards, large pumps, sewage plant equipment, etc., are subject to inspection at the source. 4- 1. 4 Test of Materials.

Add the following paragraphs:

Geotechnical ( soil) testing of fill materials, subgrade, subbase, and base will be conducted by the Agency and the Geotechnical Engineer. Geotechnical ( soil) tests may include relative compaction tests, sand equivalents tests, sieve analysis, R-values, etc. The results shall be presented directly by the laboratory to the Engineer. No base, concrete or pavement shall be placed before the subgrade, subbase, base and fill have been compacted, tested and approved. The cost of any initial geotechnical soil) test shall be borne by the Agency. Additional geotechnical ( soil) tests necessitated by a failure of one ( 1) or more of the initial tests shall be made by the laboratory at the expense of the Contractor.

The Contractor shall make allowances in his construction procedure to permit testing of the Work in progress by the Engineer and no additional compensation shall be paid to the Contractor for delays due to testing.

Testing of any cast -in -place structure or concrete surface improvement will be conducted by the Agency. Concrete tests may include slump tests, air content, and compressive strength. Any results shall be presented directly by the laboratory to the Engineer. The cost of any initial concrete test shall be borne by the Agency. Additional concrete tests necessitated by a failure of one ( 1) or more of the initial tests shall be made by the laboratory at the expense of the Contractor. The Contractor shall make allowances in his construction procedure to permit testing of the Work in progress by the Engineer and no additional compensation shall be paid to the Contractor for delays due to testing. 72 06/24/2025
C10
83 of 352
The Contractor shall maintain and secure all material samples on the Project site, available to the Engineer for inspection and evaluation during normal working hours.

All packaged, manufactured products / materials for use on the Work shall be delivered to the Project site in their original unopened containers, bearing thereon the manufacturer' s name and the brand name of the product.

Wherever any product/ material is selected to be used on the Work, all such products or materials shall be of the same brand and manufacturer throughout the Work.

All products / materials shall be stored in such a manner that they will be completely protected from weather damage.

The Contractor shall pay for all failing tests that the Contractor or the Agency' s representative request in conformance with the referenced specifications or as enumerated in the supplementary provisions.
4- 1. 6 Trade Names or Equals:

Add the following paragraphs:

In accordance with the provisions of Section 3400 of the California Public Contract Code, the Contractor shall be provided a period of not less than seven ( 7) Working Days after award of the Contract for submission of data substantiating a request for a substitution of an " equal" item. Data submitted after this time period may be rejected by the Agency.

The Contractor shall substantiate his offer for use of substitute materials, processes, or equipment, which he considers to be equivalent to that indicated, by submitting three ( 3) copies of a package of description, information, and performance data, showing the equality of the offered item, and such other necessary or related information as may be required by the Engineer ( including, but not limited to, complete calculations, technical specifications, samples, or published documents relating to the performance and physical characteristics of the proposed substitute). The burden of proof as to the comparative quality and suitability of alternative material, process, or equipment shall be the Contractor' s responsibility. Independent testing or evaluation at qualified test facilities, including destructive testing, may be required as a condition of acceptance. Life cycle costs of the substitute items must be equivalent to those of the items indicated. The Engineer may require the Contractor to furnish a special performance warranty or other surety with respect to any proposed substitute. The Engineer shall be the sole judge as to the comparative quality and suitability of the substitute items, and the Engineer' s decision shall be final.

The Contractor' s offer of the substitute items shall contain the following statements and/ or information that shall be considered by the Engineer in evaluating the proposed substitution:

1. A statement that the evaluation, and acceptance or rejection of the proposed substitute, will not prejudice the Contractor' s completion of the Project in the specified time. 73 06/24/2025
C10
84 of 352

2. A statement as to whether or not acceptance of the proposed substitute will require a change in the Contract Documents.

3. A list identifying all variations of the proposed substitute from that specified.

4. A description of available maintenance, repair, and replacement service.

5. An itemized estimate of all costs or credits that will result directly or indirectly from acceptance of the proposed substitute, including redesign and claims from others.

Add the following new subsections:
4- 1. 10 Removal of Interfering Obstructions.

The Contractor shall remove and dispose of all debris, abandoned structures, tree roots and obstructions of any character met during the process of excavation, it being understood that the cost of said removals are made a part of the unit price bid by the Contractor under other various items of work.
4- 1. 11 Procedure in Case of Damage to Public Property.

Any portions of curb, gutter, sidewalk or any other City improvement not identified for removal but damaged by the Contractor during the course of construction shall be replaced by the Contractor at the Contractor' s own cost, at no additional charge to the Agency. The cost of additional replacement of curb, gutter or sidewalk in excess of the estimated quantities shown in the BID SCHEDULE and Specifications and found necessary during the process of construction ( but not due to damage resultingfrom carelessness on the part of the Contractor during construction operations), shall be paid to the Contractor at the unit prices submitted in the Bid.

SECTION 5 - UTILITIES
5- 1 LOCATION.

Revise the third paragraph of this subsection to read as follows:

At least two ( 2) Working Days ( 48 hours minimum), but not more than fourteen ( 14) days, prior to any potholing or excavating, the Contractor shall contact Underground Service Alert of Southern California at 811, 800- 227- 2600 or 800- 422- 4133 for a Dig Alert I.D. Number and shall ensure that all existing underground utilities have been marked by their owners prior to any potholing or excavating. Section 4216 / 4217 of the Government Code requires a Dig Alert I.D. Number to be issued before a " Permit to Excavate" will be valid.

Revise the fourth paragraph of this subsection to read as follows:

Caltrans and certain other agencies are not required to become a member of Underground Service Alert of Southern California. The Contractor shall contact Caltrans and other non- member agencies 74 06/24/2025
C10
85 of 352
such as railroads, federal government and regional flood control districts for the location of their subsurface installations.

Revise the fifth paragraph of this subsection to read as follows:

Unless specified otherwise as previously potholed, elevations shown on the Plans for existing utilities are based on a search of record information available during the design only and are solely for the Contractor' s convenience. The Agency does not warrant the accuracy of the completeness of the location, elevation or type of existing utilities and substructures shown on the Plans. The Contractor shall pothole ( or by other suitable methods) and determine the location and depth of all utilities marked by their owners, and of all service connections and laterals, which may affect or be affected by the Contractor' s operations. The Contractor shall provide all survey necessary to locate the proposed alignment for potholing purposes. Said potholing shall be done ahead of trench excavation and pipe laying such that the information on horizontal location and depth, in the form of a tabulated pothole report with utility type, stations, top of pipe elevation, and clearance from proposed facility profile, shall be given to the Engineer at least fourteen ( 14) Working Days ahead of trench excavation or other construction but not greater than thirty ( 30) Working Days ahead of construction in that area.

The Contractor shall pothole all underground utilities which are shown on the Plans, or marked in the field by utility owners, as being within five feet ( 5') horizontal distance from the edge of any planned Project sewer main or lateral, water main or service, storm drain, electrical conduit, gas main, telephone and cable TV conduit, fiber optic conduit or irrigation conduit alignment, and which are within the trench excavation section or above the planned Project facility. The potholes shall be at all crossings of each utility and at one hundred foot ( 100') intervals along each parallel utility. The Contractor shall refill these potholes immediately after establishing those locations. The refilling shall conform to the relative compaction requirements for trenches. In the event obstructions not shown on the Plans are encountered during the progress of the Work which will require alterations to the Plans, or if potholing indicates utilities are located other than as shown on the Plans, the Engineer shall change the Plans and order the necessary deviation from the Project planned line and grade. The Contractor shall not make any deviation from the specified line and grade without approval by the Engineer. Should any deviations in the line and grade be permitted by the Engineer at the request of the Contractor, any additional costs for thrust blocks, valves, concrete, or other additional costs shall be borne by the Contractor. Full compensation for such work shall be considered as included in the prices bid for other items of work. No extension of time or additional compensation will be made for delays caused by failure of the Contractor to complete necessary potholing in a timely manner. The Contractor shall bear the cost of repairing or replacing any existing facility damaged by his potholing work, and shall have affected services back in operation within four ( 4) hours of interruption.

Add the following new subsection to read as follows:
5- 1. 1 Payment. The lump sum price for Utility Potholing in the BID SCHEDULE shall include all labor, materials, and equipment necessary to perform the work and document the results, and no additional compensation will be allowed. If no bid item is shown in the BID SCHEDULE the payment is considered to be included in the prices bid for various related items of the Work. 5- 2 PROTECTION.
75 06/24/2025
C10
86 of 352
Revise the second paragraph to read:

The Contractor shall furnish and place the necessary protection at its expense to ensure support of utilities located as shown on the Plans or in accordance with 5- 1. Any damage to a utility shall be repaired by the Contractor to the satisfaction of the organization owning the facility at no additional cost to the Agency. The Agency reserves the right, if so requested by the utility owner, to permit the utility owner to repair such damage, and all expenses of whatever nature arising from such damage shall be borne by the Contractor.

Revise the third paragraph to read:

Upon learning of the existence and location of any underground utility main structures omitted from or shown incorrectly on the Plans, the Contractor shall immediately notify the Engineer and utility owner in writing. When authorized by the Engineer, support or protection of the utility main substructure will be paid for as provided in Subsection 3- 2 or 3-3.

Add the following paragraph to this subsection:

During construction of the Work, some of the existing utilities may fall within the prism of trenches.

If the existing utility does fall within the Contractor' s trenches, the utility involved shall be supported properly by the Contractor to the satisfaction of the utility owner. The method of support of the utility, precautions to be taken during trench backfill and compaction, etc., shall be per the utility owner' s requirements. The cost to support and protect existing utilities shall be included in the various bid items and no additional compensation shall be allowed. The Contractor shall contact the utility owner should it anticipate such exposure of any of the existing utilities. 5- 4 RELOCATION.

Revise the third and fourth paragraphs to read:

The Contractor shall alter, relocate, or reconstruct all fire hydrants, traffic signal and street light pullboxes, sewer cleanouts and manholes, storm drain cleanouts and manholes, and other surface and subsurface structures owned by the City of Vista or by the City of Oceanside, or those facilities required in the Plans or Specifications to be altered, relocated, reconstructed, or adjusted to grade.

Payment for this work shall be as shown in the BID SCHEDULE. If no item is included in the Bid for this work, the cost for this work shall be included in the related items of Work. Temporary or permanent relocation or alteration of utilities requested by the Contractor for its convenience shall be its responsibility and it shall make all arrangements and bear all costs.

All water valve covers and meter boxes owned by VID; CP Test Station covers; electrical utility vaults and transformers; gas utility valve covers; telecommunication vaults, manholes and risers; and other surface and subsurface structures, not owned by the City of Vista, or required in the Plans or Specifications to be relocated or adjusted to grade " By Others", shall be relocated or adjusted to grade 76 06/24/2025
C10
87 of 352
by the owner of the respective utility. The Contractor shall notify each utility owner a minimum of two 2) Working Days before commencing the Work near their facilities.

Revise the fifth paragraph to read:

The utility owner will alter or relocate service connections as necessary within the limits of the Work or within temporary construction or slope easements. For sewer and water services, the Contractor shall arrange for the alteration or relocation of service connections as necessary between the sewer main or the water meter and property line, or between the sewer main or the water meter and the limits of temporary construction or slope easements. In all cases of alteration or relocation of service connections, the Contractor shall notify residences being affected a minimum of four ( 4) hours prior to said alteration or relocation, and service connections shall be returned to service in no more than four ( 4) hours. Payment for the alteration or relocation of sewer or water service connections shall be as shown in the Bid Schedule. If no item is included in the Bid for this work, the cost of this relocation shall be included in the Bid for the items of Work necessitating such relocation. Payment for the relocation of other utility service connections, when directed by the Engineer, shall be in accordance with 3- 2 or 3- 3. Payment will include the restoration of all existing improvements which may be affected thereby. The Contractor may agree with the owner of any utility to disconnect and reconnect interfering service connections. The Agency will not be involved in any such agreement. 5- 6 COOPERATION.

Revise the first paragraph to read:

The Contractor shall so conduct its operations as to permit access to the Work site and provide time for utility work to be accomplished during the progress of the Work. The Agency has initiated communication with the appropriate utility companies that provide for the various service connections or utility relocations and adjustments as noted on the Plans. The responsibility for coordination with utility companies will be transferred to the Contractor with the Notice to Proceed and the Contractor shall assume the responsibility for all further coordination with the utility company. The Contractor shall be responsible for maintaining contact with the utility company representatives and providing necessary effort in scheduling utility work so that delays in overall construction schedule are avoided and utility services are in place for connection upon completion of Contract construction.

Add the following paragraphs to this Subsection:

The Contractor shall be responsible for coordinating with utility companies and other public service agencies, as necessary, to assure timely relocation or adjustment of franchise utilities and other facilities within the specified Contract completion time. The Contractor shall schedule his work to accommodate the adjustments, relocations and / or replacements, to avoid interference with the Contractor' s work. The Contractor is required to contact the appropriate utility agencies within the construction corridor prior to the start of the Work for updates to the status of the utility work, and for details regarding their respective schedules and requirements ( i.e. inspections, etc.).

The Contractor shall contact the organizations at the beginning of the Project, obtain information on their requirements, provide them a construction schedule that meets their requirements, update the construction schedule on a weekly basis, meet with the company representatives, provide an 77 06/24/2025
C10
88 of 352
adequate construction window and a clear area for them to work, document meetings and coordination efforts, provide copies of all correspondence and other documentation to the Agency on a weekly basis, and perform all other necessary coordination work to the satisfaction of the organizations and the Engineer. Notifications by the Contractor shall be in writing, with proof of receipt.

Copies of each notification and proof of receipt shall be submitted to the Engineer.

SECTION 6 - PROSECTUTION, PROGRESS,

AND ACCEPTANCE OF THE WORK
6- 1 CONSTRUCTION SCHEDULE AND COMMENCEMENT OF WORK.
6- 1. 1 Construction Schedule.

Delete this section in its entirety and replace with the following:
6- 1. 1 Construction Schedule. Within ten ( 10) Working Days after execution of the Contract or at the Pre -Construction Meeting, and prior to the commencement of work, the Contractor shall submit its proposed construction schedule to the Engineer using a scheduling program ( e.g. Microsoft Project, Oracle' s Primavera or other approved equal program capable of producing the required information).

The construction schedule shall be in the form of a tabulation, bar or Gantt chart, or graph satisfactory to the Engineer, and in sufficient detail to show chronological relationship of all activities on the Project. Said activities include, but are not limited to, estimated start and finish dates of all tasks that make up each bid item, submittal of shop drawings to the Engineer for approval, procurement of materials, and scheduling of equipment. Along with the construction schedule, the Contractor shall submit a cash -flow projection showing the anticipated amount of each monthly payment that will become due the Contractor in accordance with the construction schedule.

The Contractor shall schedule and stage the Work on all streets to cause the least possible inconvenience to vehicular traffic ( including busses and trash vehicles), bicyclists, pedestrians, adjacent businesses, local residences and schools.

The Contract time listed in the Specifications is the Agency' s best estimate of how long it will take to complete the Work. The construction schedule shall reflect all Contract requirements, shall recognize the requirements of Subsection 5- 5 (" DELAYS."), and shall reflect completion of all work under the contract, including Punchlist items, in the specified time and in accordance with the Project Specifications and Plans. No schedule shall call for completion of the Project before or after the Contract completion date. The Project owns the float time and is not for the exclusive benefit of any Party. As such, liability for delay of the project completion date rests with the party actually causing the delay to the project completion date. By way of the Contractor assigning activity durations and proposing the sequence of the work, the Contractor hereby agrees to utilize sufficient and necessary management and other resources to perform the work in accordance with the construction schedule.

A Notice to Proceed shall be issued after the Pre -Construction Meeting, provided the Storm Water Pollution Prevention Plan ( SWPPP) and the Construction Staging / Traffic Control Plan have been submitted by the Contractor and accepted by the Engineer, and all other appropriate Contract 06/24/2025
C10
89 of 352
requirements are fulfilled. The Work shall start within ten ( 10) Working Days thereafter, and shall be diligently prosecuted to completion within the time provided in the Project Specifications.

For projects of forty- five ( 45) Working Days or more, the Contractor shall submit to the Engineer an updated construction schedule each month, showing the actual progress of the Work, as part of the Partial Payment request. Monthly progress payments are conditioned upon the Engineer receiving from the Contractor the monthly schedule update. Schedule updates must accurately reflect the " as - built" schedule. All changes to the schedule shall be highlighted or otherwise identified. Approved Change Orders shall also be incorporated in the updated schedule. It is highly recommended that a narrative be included with each update. The narrative should include a description of any logic changes made to the Project, a commentary as to gains and losses to critical and near critical activities, and a quantification of the gains and losses to the critical path. Failure to provide an updated construction schedule may result in withholding Contract payments until one is submitted.

If the Contractor desires to make a major change in the method of operations after commencing construction, or if the schedule fails to reflect the actual progress of the Work for any reason, the Contractor shall submit to the Engineer a revised construction schedule in advance of beginning revised operations. In the event that an action either by the Agency or the Contractor results in a delay to the schedule, it is beneficial if the parameters pertaining to that action are recorded as they happen.

Add the following new subsection:
6- 1. 3 Pre -Construction Meeting.
6- 1.3 Pre -Construction Meeting. A Pre -Construction Meeting shall be scheduled after the award and prior to construction. The Contractor ( Principal and Project Superintendent) and any subcontractor for five percent ( 5%) or more of the work shall attend and be prepared to provide or discuss the following information:
a) Construction schedule
b) Subcontractors
c) City of Vista Stormwater Permit and Storm Water Pollution Prevention Plan ( SWPPP), if required d) Traffic Control Plans
e) Survey requirements
f) Materials and delivery schedule
g) Local phone numbers for supervisory personnel
h) List of Emergency phone numbers ( see Subsection 7- 17 of these Specifications) i) Required permits
j) Coordination with other agencies
The Construction Schedule to be provided shall be as described in Subsection 6- 1. 1(" Construction Schedule.") of these Supplementary General Provisions.
6- 2 PROSECUTION OF THE WORK.

Insert the following paragraph after the first paragraph:
79 06/24/2025
C10
90 of 352
Contractor shall, at contractor' s sole cost and expense, be solely and completely responsible for all matters affecting the prosecution, progress and completion of the work ( both on and off thejob site), and for observing all laws and providing for public convenience and safety, safety of workers ( including its workers and those of its subcontractors, suppliers and others contributing to the work) and others, protection of property and rights of others, including location, maintenance and replacement of utilities whether shown on the plans or not, prior notification to utility owners, drainage from storm runoff, and all easements right- of-way and encroachment permits required by the City of Carlsbad. Nothing in the Agreement, the specifications, or other Contract Documents or AGENCY's approval of the plans and specifications, or inspection of the work is intended to include a review, inspection, acknowledgement of or responsibility for any such matters and AGENCY, AGENCY's engineer, and their consultants, and each of their directors, officers, employees and agents, shall have absolutely no responsibility or liability therefore.
6- 3 SUSPENSION OF THE WORK.
6- 3. 1 General.

Replace this subsection in its entirety with the following:
6-3. 1 General. The Engineer shall have the authority to suspend the Work, wholly or in part, for such period as the Engineer may deem necessary, due to unsuitable weather or to such other conditions including an act of God or Force Majeure) as are considered unfavorable for the suitable prosecution of the Work, or for such time as the Engineer may deem necessary due to the failure on the part of the Contractor to carry out orders given or to perform any provisions of the Work. The Contractor shall immediately comply with the written order of the Engineer to suspend the Work wholly or in part and shall not resume the Work until ordered to do so in writing by the Engineer. Such suspension shall be without liability to the Contractor on the part of the City except as otherwise specified in Subsection 6-6.3 Payment for Delays.").

In the event a suspension of work is ordered because of failure on the part of the Contractor to carry out orders given or to perform any provisions of the Work, such suspension of work shall not relieve the Contractor of his responsibility to complete the Work within the time limit set forth herein and shall not be considered cause for extension of the time for completion and, further, such suspension of work shall not entitle the Contractor to any additional compensation.

If the work is suspended or otherwise not continuously prosecuted for any cause whatsoever, within or without the time for completion, the Contractor shall, at his sole cost and expense, remove and replace all or any portion of the work already completed and inspected which Agency, at its sole discretion, could have been damaged during the suspension of work.
6- 6 DELAYS AND EXTENSIONS OF TIME.
6- 6. 2 Extension of Time.

Add the following paragraph to the end of this subsection:
06/24/2025
C10
91 of 352
Delays to the project caused by labor disputes or strikes involving trades not directly related to the project, or involving trades not affecting the project as a whole shall not warrant an extension of time.

Daily charges for time extensions or delays from other causes shall be limited to negotiated amounts, or if no amounts are agreed upon, shall not exceed those charges documented to Agency' s satisfaction for additional labor and material costs associated with the delay, and an amount not exceeding 10% thereof for overhead and profit.
6- 6. 4 Written Notice and Report.

Replace the paragraph in this subsection with the following:
6- 6. 4 Written Notice and Report. If the Contractor desires payment for a delay as specified in Subsection 6- 6. 3 (" Payment for Delays."), or an extension of time, it shall file with the Agency a written request and report of cause within ten ( 10) Working Days after the beginning of the event or occurrence giving rise to the delay. The written notice shall include a statement or estimate of the time extension or compensation being requested, documents supporting the request, including but not limited to evidence of all facts supporting the alleged claim and a current schedule showing the impact of the event or occurrence on the critical path. The request for payment or extension must be made at least fifteen ( 15) Working Days before the specified completion date. Failure by the Contractor to file these items within the times specified will be considered grounds for refusal by the Agency to consider such request.

By submitting a request for compensation or time extension, the Contractor agrees to make all books and records, including original bid estimates, subcontracts, daily reports, and correspondence, available to the Agency for review. The Contractor also agrees to include this requirement in all subcontracts.
6- 7 TIME OF COMPLETION.
6- 7. 1 General.

Delete the paragraph in this subsection and replace with the following:
6- 7. 1 General. The Contractor shall complete all portions of the Work, including Punchlist items, in accordance with the terms and conditions of the Contract Documents, within the number of days stated in the Notice Inviting Bids from the date of the Notice to Proceed. Construction on the Project shall begin within ten ( 10) Working Days of the Notice to Proceed and progress in good faith towards completion without unnecessary delay. The Contractor must work diligently to complete all Punchlist items within twenty ( 20) Working Days after the Engineer provides the Punchlist.

Contractor shall schedule multiple crews at different locations along the alignment to ensure the work is completed by the official start of 2024- 2025 winter rainy season on October 1. Completion of modifications are needed for Buena Sanitation District to meet peak wet weather flow requirements. This requirement has established the basis for the $ 2500 per day Liquidated Damages charges included in the contract. 6- 7. 2 Not Used.
06/24/2025
C10
92 of 352
Replace this subsection with the following:
6- 7. 2 Working Days / Hours.
6- 7. 2 Working Days / Hours. Unless otherwise specified, the Contractor' s activities for construction within Palomar Airport Road right- of- way shall be confined to nighttime working hours between 8: 30PM and 5: 30AM, Sunday through Thursday night. Contractor' s activities for Odor Control Unit No. 2 & 3 modifications within Buena Sanitation District' s easement areas is permitted during normal daytime working hours excepting any limitations imposed on the work from traffic control impacts to access the site from the Palomar Airport Road right of way.

No work shall be done on Saturdays, Sundays, or holidays without authorization by the Engineer or permitting agency. Deviation from these non -Working Days will not be permitted without the prior consent of the Engineer except in emergencies involving immediate hazard to persons or property.

Deviation from these working days and hours will not be permitted without the prior consent of the Engineer except in emergencies involving immediate hazard to persons or property. In the event of either a requested or emergency deviation during non -Working Days/ Hours, overtime inspection fees will be charged against the Contractor. The overtime inspection fees will be calculated at overtime rates and will be deducted from any amounts due the Contractor. 6- 8 COMPLETION, ACCEPTANCE, AND WARRANTY.
6- 8. 3 Warranty.

Replace the last paragraph with the following:

If at any time during the warranty period, or during the extended warranty period specified, the Engineer finds the Work, or any part of the Work, to be defective or not in conformance with the plans and specifications, whether or not manufactured, fabricated, installed, completed or overlooked and accepted by the Engineer, the Contractor must, in accordance with the Engineer' s written instructions and within the specified time limits, either correct the defective or non -conforming Work, or, if it has been rejected by the Engineer, remove it from the Site and replace it with non -defective and conforming Work.

The Engineer may determine in its sole discretion to accept defective work in lieu of requiring the Contractor to correct or remove and replace the defective work. However, the Contractor must bear all direct and indirect costs of the defective work, and the diminished value to the Project, as determined by the Engineer. If the Engineer' s acceptance of defective work occurs prior to Final Payment, the Engineer will issue a Change Order incorporating the necessary revisions in the Contract Documents with respect to the defective work and affording the Agency the appropriate decrease in the Contract Price.
06/24/2025
C10
93 of 352
If the Contractor fails to correct, remove, or replace defective work or non -conforming work within five ( 5) Working Days from the date of written notice from the Engineer, the Engineer may proceed expeditiously with any correction undertaken in accordance with this section. The Agency may remedy after five ( 5) Working Days from the date of written notice when the Contractor fails to correct the Work in accordance with the Contract Documents, or when he fails to comply with any other provision of the Contract Documents. If, in the opinion of the Agency, the non -conforming work or defective work creates a dangerous condition or requires immediate attention or correction to prevent further loss to the Agency or any other party, or to prevent interruption of operation of any Agency service or any service of any other party, The Agency will attempt to give notice required by this paragraph. If the contractor cannot be contacted or does not comply with the Agency' s request for correction within a reasonable time determined by the Agency, then the Agency or other party may proceed to provide attention or make required corrections, and the cost of all correction or attention shall be charged to and paid for by the Contractor. The Agency may remedy immediately in the event of an emergency.

When undertaking remedial action under this section, the City may: exclude the Contractor from all or part of the Site; take possession of all or part of the Work, and suspend the Contractor' s Work and or Services; and incorporate into the Project all materials and equipment stored at the Site or for which the City has paid but the Contractor has stored elsewhere.

The City will not allow an extension of the Contract Time or milestones because of any delay in the performance of the Project attributable to the City' s undertaking remedial action to correct Defective Work.

If the Contractor completes the Project or portions of the Project prior to the Notice of completion NOC), he must preserve equipment by developing and implementing a preventive maintenance program in compliance with manufacturer' s recommendations.

The Contractor must repair or replace the traffic signal and lighting system equipment within seventy- two ( 72) hours after notification of defects by the Engineer.

The Contractor must pay for any claims, costs, losses, and damages incurred by the Agency in remedying any deficiency ( e.g., all costs of repair or replacement of Defective Work and all costs of repair of any other Work on the Project destroyed or damaged by correction, removal, or replacement of your Defective Work).

Add the following paragraphs to the end of this subsection:

Replacement of earthfill or backfill, where it has settled below the required finish surfaces, shall be considered part of repairs of defective work, and any repair of surfacing constructed by the Contractor, which becomes necessary because of settlement or ground movement, shall be likewise considered part of such repair work.

Any existing improvements which are damaged by the Contractor' s operations, or any new work, including concrete, which is cracked, chipped, discolored, improperly finished, heaved, vandalized, or for any other reason does not conform to the specifications, shall be replaced by the Contractor at no additional cost to the Agency.
06/24/2025
C10
94 of 352
The parties agree that no certificate given, with the exception of the certificate of final payment, shall be conclusive evidence of the faithful performance of the Contract, either in whole or in part, and that no payment shall be construed to be in acceptance of any defective work or improper materials.

Further, the certificate of final payment shall not terminate the Contractor' s obligations under his warranty herein above. The Contractor agrees that payment of the amount due under the Contract and the adjustments and payments due for any work done in accordance with any alterations of the same, shall release the Agency, the Agency' s Council and its officials, officers and employees from any and all claims or liability on account of work performed under the Contract or any alteration thereof.

No materials, supplies, or equipment for the Work under this Contract shall be purchased subject to any chattel mortgage or under a conditional sale contract or other agreement or supplier. The Contractor warrants clear and good title to all materials, supplies, and equipment installed and incorporated in the Work and agrees upon completion of all work to deliver the premises, together with all improvements and appurtenances constructed or placed thereon by the Contractor, and further agrees that neither the Contractor nor any person, firm or corporation furnishing any material or labor for any work covered by the Contract shall have any right to a lien upon the premises or any improvement or appurtenance thereon, provided that this shall not preclude the Contractor from installing metering devices or other equipment of utility companies the title of which is commonly retained by the utility company. Nothing contained in this article, however, shall defeat or impair the right of such persons furnishing materials or labor under any bond given by the Contractor for their protection, or any right under any law permitting such persons to look to funds due the Contractor, which are in the hands of the Agency. The provisions of this article shall be inserted in all subcontracts and material contracts, and notices of its provisions shall be given to all persons furnishing materials for the Work when no formal contract is entered into for such materials.

With respect to all warranties, express or implied, from Subcontractors, manufacturers, or suppliers for Work performed and materials furnished under this Contract, the Contractor shall:
and
a) Obtain for Agency all warranties that would be given in normal commercial practice; b) Require all warranties to be executed, in writing, for the benefit of the Agency or other parties; c) Enforce all warranties for the benefit of the Agency or other parties, unless otherwise authorized in writing by the Agency.

This subsection shall not limit the Agency' s rights under this Contract or with respect to latent defects, gross mistakes, or fraud. The Agency specifically reserves all rights related to defective work, including but not limited to the defect claims pursuant to California Code of Civil Procedure Section 337. 15.
6- 9 LIQUIDATED DAMAGES.

Replace this subsection with the following:
6- 9 LIQUIDATED DAMAGES. Failure of the Contractor to complete the Work within the time allowed will result in possible damages being sustained by the Agency. For each consecutive working day in excess of the time specified for completion of Work, as adjusted in accordance with Subsection 6- 6 LEI
06/24/2025
C10
95 of 352
DELAYS AND EXTENSIONS OF TIME."), the Contractor shall pay to the Agency, or have withheld from monies due the Contractor, the sum of two thousand five hundred dollars ($ 2500. 00).

Execution of the Contract shall constitute agreement by the Agency and Contractor that the sum of two thousand five hundred dollars ($ 2500. 00) per working day is the value of the costs and actual damage caused by the failure of the Contractor to complete the Work within the allotted time. Such sum is liquidated damages and shall not be construed as a penalty, and may be deducted from payments due the Contractor if such delay occurs.

SECTION 7 - RESPONSIBILITIES OF THE CONTRACTOR
7- 1 THE CONTRACTOR' S EQUIPMENT AND FACILITIES.
7- 1. 1 General.

Replace the second paragraph with the following paragraph:

The Contractor shall provide his own sanitary accommodations, including enclosed portable toilets and hand washing stations, for the convenience of the workers on the Project. The accommodations shall be regularly maintained by a company that specializes in providing and maintaining those facilities. The Contractor shall ensure that all workers on the Project, including those of subcontractors, use the Contractor' s accommodations and do not use any public or private facilities while working on the Project.

Add the following paragraphs:

The Contractor must furnish adequate equipment to properly perform the Work in a workmanlike manner. Such equipment must be in good state of repair and maintained in such state during the progress of the Work. No worn or obsolete equipment shall be used, and in no case shall the maker' s rating of capacity for any equipment be exceeded. Equipment not suitable to produce the quality or work required for this Project will not be permitted to operate. Such equipment and facilities shall meet all requirements of applicable ordinances and laws.

All construction equipment, stationary or mobile, shall be equipped with properly operated and maintained muffler exhaust systems. Stockpiling in vehicle staging area shall be located as far as practical from occupied dwelling units and shall be subject to approval by the Engineer.

Full compensation for conforming to the requirements of this provision shall be considered as included in the Contract price paid for various items of work and no additional compensation will be allowed therefore.
7- 1. 2 Temporary Utility Services.

Add the following to this subsection:

L-IR
06/24/2025
C10
96 of 352
The Contractor shall contact Vista Irrigation District ( VID) to obtain a construction water meter and determine all terms, costs, conditions and regulations imposed on the Contractor for use thereof.

Contractor will be required to pay for usage of water through construction water meter. 7- 2 LABOR.
7- 2. 1 General.

Add the following paragraphs to this subsection:

No contractor or subcontractor of any tier may be awarded a Contract for public work on a public works project or work on a public works project without proof of registration with the Department of Industrial Relations pursuant to Labor Code section 1725. 5.

Registrations under Section 1725. 5 expire annually at the end of June, and Contractor is responsible for verifying the renewal status of each subcontractor, of any tier, working on this Contract, and providing City with an updated list of all subcontractors and their registration status. Subcontractors who do not timely renew their registration must be removed from the job site until they are registered.

The removal of a subcontractor for failure to be registered shall not be cause for any extension of time or additional compensation of any nature under the Contract.

In accordance with the requirements of Section 1771. 10) of the Labor Code, the Agency will observe and enforce any Stop Order issued by the Labor Commissioner where a contractor or subcontractor engages in the performance of any public work Contract without having been registered in violation of the requirements of Section 1725. 5 or this section, and will not allow the unregistered contractor or the unregistered subcontractor to work on any public works until the unregistered contractor or unregistered subcontractor is registered.

In accordance with the provisions of Section 1771. 4( a)( 1) of the California Labor Code, this project is subject to compliance monitoring and enforcement by the Department of Industrial Relations.

In accordance with the provisions of Section 1771. 4( a)( 2) of the California Labor Code, the prime contractor shall post job site notices, as prescribed by regulation. 7- 2. 2 Prevailing Wages.

Replace the subsection with the following paragraphs:

Pursuant to the Vista City Charter and the Vista Municipal Code, payment of prevailing wages and compliance with the California Labor Code Sections 1770 et seq IS required for this Project.

State prevailing rates of wages and classifications, as applicable to this contract, are ascertained and adopted by the State of California, Director of Industrial Relations ( DIR) pursuant to California Labor Code Article 2 of Chapter 1 of Part 7 of Division 2, as amended, which is made a part herein, and the provisions of Section 1777. 5 and 1777. 6 of the Labor Code concerning the employment of L.Q.
06/24/2025
C10
97 of 352
apprentices by the Contractor or any subcontractor under him. Certified payroll on an approved compliance format is required for all work under this Contract.

Pursuant to Section 1773 of the Labor Code, the general prevailing wage rates in the county, or counties, in which the Work is to be done have been determined by the Director of the California Department of Industrial Relations ( DIR). These wages are set forth in the General Prevailing Wage Rates for this Project, available at the California Department of Industrial Relations' ( DIR) Internet URL website link at:
http:// www. dir. ca. gov/ DLSR/ PWD
When the Contractor intends to use a craft or classification not shown in the wage provisions, it will be required to pay the wage rate of that craft or classification most closely related to that craft or classification as shown on the wage provisions. In case of disagreement between the Contractor and the Agency, the Engineer shall decide the prevailing wages for the labor.

The Contractor shall comply with the provisions of California Labor Code Section 1773. 8 which requires the payment of travel and subsistence payments to each worker needed to execute the work to the extent required by law.

The Contractor shall, as a penalty to the Agency, forfeit not more than fifty dollars ($ 50) for each calendar day, or portion thereof, for each worker paid less than the prevailing rates as determined by the Director of Industrial Relations for the work or craft in which the worker is employed for any public work done under the Contract by Contractor or by any subcontractor.

The state prevailing wage determination used for this Project is the latest determination on the bid advertising date. The federal wage determination used for this Project is the latest determination ten 10) Working Days before the bid opening. Within ten ( 10) days before the bid opening an addendum will be issued to holders of Plans and Project Specifications containing the latest Federal prevailing wage rate determinations to be used for the Project.

Attention is directed to the Federal minimum wage rate requirements. On Federally funded projects, if there is a difference between the minimum wage rates predetermined by the Secretary of Labor and the general prevailing wage rates determined by the Director of the California Department of Industrial Relations ( DIR) for similar classifications of labor, the Contractor and subcontractors shall pay not less than the higher wage rate. The Agency will not accept lower State wage rates not specifically included in the Federal minimum wage determinations. This includes " helper" ( or other classifications based on hours of experience) or any other classification not appearing in the Federal wage determinations. Where Federal wage rate determinations do not contain the State wage rate determinations otherwise available for use by the Contractor and subcontractors, the Contractor and subcontractors shall pay not less than the Federal minimum wage rate which most closely approximates the duties of the employees in question.

Add the following new subsection:
7- 2. 2. 1 Apprentices.
06/24/2025
C10
98 of 352
Attention is directed to the provisions of Section 1777. 5 and 1777. 6 of the labor Code concerning the employment of apprentices by the Contractor or any Subcontractor under him/ her. The Contractor and any Subcontractor under him/ her shall comply with the requirements of said sections in the employment of apprentices.

The Agency will provide notice to the Department of Industrial Relations of any public works Contract using the online PWC-100 form. The online PWC- 100 form is also transmitted to the Department of Apprenticeship Standards ( DAS) to inform them of the award of a contract. The Contractor and each subcontractor shall also submit a " Public Works Contract Award Information" form ( DAS form 140) to inform all applicable apprenticeship committees of the award of a contract.

The Contractor and each subcontractor shall provide written evidence to the Agency that the request for dispatch of apprentices to the training agencies has been completed using the DAS 142 form.

Contributions to a training fund, or the California Apprenticeship Council, for every worker on the job, are required.

The Contractor and all subcontractors shall submit to the Agency copies of the " Public Works Contract Award Information" forms ( DAS form 140) and all requests for dispatch of apprentices on the DAS 142 form. These DAS forms are available from the California Department of Industrial Relations' DIR) Division of Apprenticeship Standards website link at:
http:// www. dir. ca. gov/ DAS/ das. html
The Contractor is not required to use apprentices on projects under thirty thousand Dollars 30, 000).
7- 2. 3 Payroll Records.

Add the following after the first sentence:

In accordance with the requirements of the California Prevailing Wage Laws, Contractor and each Subcontractor shall keep an accurate payroll record, showing the name, address, social security number, work classification, straight time, and overtime hours worked each day and week, and the actual per diem wages paid to each journeyman, apprentice, worker, or other employee employed by him or her in connection with the work. The payroll records shall be certified and submitted to the DIR electronically in accordance with the California Prevailing Wage Laws. Contractor shall be subject to, and fully comply with, all California Prevailing Wage Laws, including, but not limited to, those pertaining to the maintenance and inspection of certified payroll records. Copies of the record of wages paid shall be certified by the Contractor and submitted to the DIR with each progress payment request. In the event of noncompliance with the requirements of this section for payroll records, and upon the request of the DIR, contractor penalties shall be withheld from Contract payments. 7- 3 LIABILITY INSURANCE.

Delete this section in its entirety and replace with the following:

The Contractor shall procure and maintain for the duration of the Contract, insurance against claims for injuries to persons or damages to property which may arise from or in connection with the performance of the work hereunder by the Contractor, his agents, representatives, employees, or subcontractors.

I
06/24/2025
C10
99 of 352
Without limiting the Contractor' s indemnification, it is agreed that the Contractor shall maintain in force at all times the following policy, or policies, of insurance covering its operations:
a) Commercial General Liability ( CGL) -- Insurance Work Office Form CG 00 01 covering CGL on an " occurrence" basis, including products, completed operations, property damage, bodily injury, and personal & advertising injury with limits no less than $ 2, 000, 000 per occurrence. If a general aggregate limit applies, either the general aggregate limit shall apply separately to this Project/ location or the general aggregate limit shall be twice the required occurrence limit.
b) Automobile Liability -- Insurance Work Office Form Number CA 0001 covering Code 1 (any auto), with limits no less than $ 2,000, 000 per accident for bodily injury and property damage. Any and all mobile equipment, including cranes, which are not covered under Automobile Liability, shall have said coverage provided for under Comprehensive General Liability policy.
c) Contractors Pollution Legal Liability ( for projects involving the public sewer system), appropriate to cover such activities as cleanup, removal, storage, or otherwise handling of hazardous or toxic chemicals, materials, substances, or any other pollutants; in an amount sufficient to cover potential losses from an incident, with limits no less than $ 1, 000, 000 per occurrence or claim, and $ 2,000, 000 policy aggregate. d) Transporters Pollution Liability ( for projects involving the public sewer system), to cover transportation of hazardous or toxic chemicals, materials, substances or any other pollutants, the Contractor shall provide an amount sufficient to cover potential losses from an incident, but not less than $ 1, 000, 000 per occurrence or claim, and $ 2, 000, 000 policy aggregate.

If the contractor maintains higher limits than the minimums shown above, the City requires and shall be entitled to coverage for the higher limits maintained bythe contractor. Any available insurance proceeds in excess of the specified minimum limits of insurance and coverage shall be available to the City.

Any deductibles or self -insured retentions must be declared to and approved by the City. At the option of the City, either: the contractor shall cause the insurer shall reduce or eliminate such deductibles or self -insured retentions as respects the City, its officers, officials, employees, and volunteers; or the Contractor shall provide a financial guarantee satisfactory to the City guaranteeing payment of losses and related investigations, claim administration, and defense expenses.

Certificates of insurance and a complete copy of the insurance policies evidencing the coverages required by the clauses set forth above shall be filed with the Agency prior to the effective date of this Agreement. This is a condition precedent to the formation of any obligation by the Agency to compensate the Contractor under this Agreement.

The insurance policies are to contain, or be endorsed to contain, the following provisions:

1. The City, its officers, officials, employees, and volunteers are to be covered as additional insureds on the CGL policy with respect to liability arising out of with respect to liability arising out of work or operations performed by or on behalf of the Contractor including materials, parts, or 06/24/2025
C10
100 of 352
equipment furnished in connection with such work or operations and automobiles owned, leased, hired, or borrowed by or on behalf of the Contractor. General liability coverage can be provided in the form of an endorsement to the Contractor' s insurance ( at least as broad as ISO Form CG 20 10, CG 1185 or both CG 20 10 and CG 20 37 forms if later revisions used), unless otherwise approved in advance by City.

2. For any claims related to this Project, the Contractor' s insurance coverage shall be primary insurance as respects the City, its officers, officials, employees, and volunteers. Any insurance or self- insurance maintained by the City, its officers, officials, employees, or volunteers shall be excess of the Contractor' s insurance and shall not contribute with it.

3. Each insurance policy required by this clause shall provide that coverage shall not be canceled, except with notice to the City.

Contractor may submit evidence of Builder' s Risk insurance in the form of Course of Construction coverage. Such coverage shall name the City as a loss payee as their interest may appear. If the Project does not involve new or major reconstruction, at the option of the City, an Installation Floater may be acceptable. For such Projects, a Property Installation Floater shall be obtained that provides for the improvement, remodel, modification, alteration, conversion or adjustment to existing buildings, structures, processes, machinery and equipment. The Property Installation Floater shall provide property damage coverage for any building, structure, machinery or equipment damaged, impaired, broken, or destroyed during the performance of the Work, including during transit, installation, and testing at the City' s site.

If any coverage required is written on a claims - made coverage form:

1. The retroactive date must be shown, and this date must be before the execution date of the Contract or the beginning of Contract work.

2. Insurance must be maintained and evidence of insurance must be provided for at least five ( 5) years after completion of Contract work.

3. If coverage is canceled or non -renewed, and not replaced with another claims - made policy form with a retroactive date prior to the Contract effective date, or start of work date, the Contractor must purchase extended reporting period coverage for a minimum of five ( 5) years after completion of Contract work.

4. A copy of the claims reporting requirements must be submitted to the City for review.

5. If the services involve lead -based paint or asbestos identification/ remediation, the Contractors Pollution Liability policy shall not contain lead -based paint or asbestos exclusions. If the services involve mold identification/ remediation, the Contractors Pollution Liability policy shall not contain a mold exclusion, and the definition of Pollution shall include microbial matter, including mold.

Insurance is to be placed with insurers with a current A.M. Best rating of no less than A: VII, unless otherwise approved by the City.

Contractor hereby agrees to waive rights of subrogation which any insurer of Contractor may acquire from Contractor by virtue of the payment of any loss. Contractor agrees to obtain any endorsement that may be necessary to affect this waiver of subrogation. The Workers' Compensation policy shall be endorsed with a waiver of subrogation in favor of the City for all work performed by the Contractor, its employees, agents and subcontractors.
o
06/24/2025
C10
101 of 352
Contractor shall furnish the City with original certificates and amendatory endorsements, or copies of the applicable insurance language, effecting coverage required by this Contract. All certificates and endorsements are to be received and approved by the City before work commences. However, failure to obtain the required documents prior to the work beginning shall not waive the Contractor' s obligation to provide them. The City reserves the right to require complete, certified copies of all required insurance policies, including endorsements, required by these specifications, at any time.

Contractor shall require and verify that all subcontractors maintain insurance meeting all the requirements stated herein, and Contractor shall ensure that City is an additional insured on insurance required from subcontractors. For CGL coverage, subcontractors shall provide coverage with a format least as broad as CG 20 38 04 13.

Contractor agrees to assist in every manner possible in the reporting and investigation of any accident and, upon request, to cooperate with all interested insurance carriers in the handling of any claim by securing and giving evidence and obtaining the attendance of witnesses as required for the resolution of any claim or lawsuit.

Nothing contained in these insurance requirements is to be construed as limiting the type, quality or quantity of insurance that the Contractor should maintain, or the extent of the Contractor' s responsibility or liability for payment of damages resulting for the Contractor' s operations under the contract. The carrying of the insurance specified herein shall not be construed to be a limitation of liability on the part of the Contractor or as a matter of law.

Add the following new subsection:
7- 3. 1 Failure to Procure Insurance.

Failure to Procure Insurance. Contractor' s failure to procure or maintain required insurance program shall constitute a material breach of Contract under which the Agency may immediately terminate the Contract or, at its discretion, procure or renew such insurance to protect the Agency' s interests and pay any and all premiums in connection herewith, and recover all monies so paid from Contractor, or deduct all monies so paid from payments due Contractor. 7- 5 PERMITS.

Add the following paragraphs:

The issuance of a permit based on Plans, specifications, and other data shall not prevent the Agency from ordering correction of errors in said Plans, specifications, or other data, or from preventing construction operations being carried on hereunder when in violation of any law, code or ordinance.

The Contractor shall meet the City of Carlsbad Storm Water Management Permit requirements.

As part of the permit application, the Contractor must submit a Storm Water Pollution Prevention Plan SWPPP) ( if required) to the Engineer for review and acceptance as required by the Regional Water Quality Control Board. The Contractor shall comply with all provisions of the permit throughout the 91 06/24/2025
C10
102 of 352
course of the Work. The permit must be approved by the Engineer prior to starting work. The Contractor shall include all costs for obtaining and complying with the requirements of the permit in the various items of work, and no additional compensation will be paid.

Compliance with the provisions of this section shall be considered as included in the various Contract items of work to which such regulations are applicable and no additional compensation shall be allowed therefore. Further, the enforcement of any requirements of the permits required during the performance of the Contract work shall not be made the basis for additional compensation.

The Contractor is required to obtain permit( s) from other agency ( agencies) to complete the Work in accordance with the Drawings and Project Specifications, the Agency will compensate the Contractor for the actual cost of the permit fee unless otherwise specified that the Contractor is responsible to pay the fee. The Contractor shall include all other costs associated with obtaining permits in various bid items for which the permit is required, and no additional compensation will be paid.

Add the following new subsections:
7- 5. 1 City of Vista Business License.
7- 5. 1 City of Vista Business License. A City of Vista Business License is required of the Contractor and all his/ her Subcontractors prior to execution of the Contract. A fee will be charged for any new Business Licenses or renewal of any expired Business Licenses. 7- 5. 2 City of Vista No -Fee Construction Permit.
7- 5.2 City of Vista No -Fee Construction Permit. After execution of the Contract and prior to beginning work, the Contractor shall applyfor and obtain a no -fee Construction Permit from the Agency.

Prior to applying for the permit, the Contractor shall first submit the following documents to the Engineer with proof that the policies / licenses are current:
1] Contractor' s License of appropriate classification. 2] City of Vista Business License [ see Subsection 7-5. 1(" City of Vista Business License.")] 31 General Liability Insurance Certificate. The Certificate shall be issued with the Agency listed as the Certificate Holder. The Agency shall also be listed as an additional insured. See the Supplementary General Provisions for additional Certificate requirements and the amounts and types of liability coverage. If any Subcontractor does not have the amount of liability insurance required in the Project Specifications, the General Contractor must produce evidence that the Subcontractor' s work is covered by the General Contractor' s liability insurance policy.
4] Worker' s Compensation Insurance Certificate. The Certificate shall be issued with the Agency listed as the Certificate Holder.
92 06/24/2025
C10
103 of 352
5] Waste Management Permit Application. The Contractor shall be required to recycle at least fifty percent ( 50%) of the generated waste in accordance with Vista Municipal Code Chapter

13. 17.

A permit will be issued by the Agency to the Contractor covering the Contractor and all Subcontractors.
7- 6 THE CONTRACTOR' S REPRESENTATIVE.

Replace the first two sentences with the following:

Before starting the Work, the Contractor shall provide in writing to the Agency a list of the representatives with local area codes and telephone numbers of at least two 2 persons in charge of or responsible for the Work, who can be reached for emergency work twenty- four ( 24) hours a day, seven ( 7) days a week.

Replace the third and fourth sentences with the following:

Contractor shall have on the site, at all times, a Superintendent who will be in charge of all aspects of the Contractor' s work. The Superintendent shall be the individual authorized to receive directions from the Engineer of the Project and who will at all times act as the Contractor' s representative. Any order or communication given to the Superintendent shall be deemed delivered to the Contractor.

Contractor shall only replace the Superintendent upon written approval of the Agency. The Agency shall have the right to request that the Contractor appoint a new Superintendent if the Engineer or the Agency determines that such a replacement would be in the best interest of the Project.

Add the following paragraphs:

The Contractor shall submit a daily report to the Engineer from the Contractor and all subcontractors, on forms approved by the Engineer. The report shall include a listing of all labor, materials and equipment involved for that working day. Failure to submit the daily report by the close of the next working day shall be just cause for the Agency to dispute progress pay requests. The Contractor shall coordinate daily with the Engineer to reconcile the report, and it shall be signed by both the Engineer and the Contractor. In the event of disagreement, pertinent notes shall be entered by each party to explain points which cannot be resolved immediately. Each party shall retain a signed copy of the report. Reports by subcontractors or others shall be submitted through the Contractor.

The report shall:
1] Show names of workers, classifications, and hours worked. 2] Show type of equipment, size, identification number, and hours of operation. 3] Describe the work done that working day, and what work was completed. 4] Describe status of any unresolved issues in such detail as the Agency may require. 7- 7 COOPERATION AND COLLATERAL WORK.

Replace the first paragraph with the following.
93 06/24/2025
C10
104 of 352
Nothing contained in these documents shall be interpreted as granting to the Contractor exclusive occupancy of the construction site for the Work. Should construction be under way or subsequently begun by other forces or by other contractors within or adjacent to the limits of the Work, or in the vicinity of the Work to be done under this Contract, the Contractor shall so conduct his operations as to interfere to the least possible extent with the Work of such other forces or contractors. If the performance of this Contract is likely to be interfered with by the simultaneous performance of some other forces or contractors, the Engineer will decide which contractor shall continue or whether the Work can proceed simultaneously.

Any difference or conflicts that may arise between the Contractor and such other forces or contractors because of delays or hindrance to each other, shall be adjusted and determined by the Engineer. If the Work of the Contractor is delayed because of any acts or omissions of any other contractor or force, the Contractor shall on that account have no claim for additional compensation or extra cost against the Agency.

Add the following paragraphs:

The Contractor shall perform the Work in such a manner as to maintain in operation all existing utilities and other public services. The Contractor shall allow operations and maintenance crews from any utility or other public service agency to access their facilities at anytime. Owners of the various utilities, and / or facilities at or near the Project site are as follows:

UTILITY OWNER
Gas and Electric Power Transmission and
Distribution Facilities
San Diego Gas & Electric Company

SDG& E)
Telephone and Communication Facilities AT& T Corporation Cable Television and / or Communication
Facilities
Cox Communications, Inc. , Times Warner
Cable, Crown Castle and/ or Coastal
Water and Sewer Carlsbad Municipal Water District
Sewer Vallecitos Municipal Water District
Traffic Signals, Street Lights, and Fiber Optic
Communication Facilities City of Carlsbad Public Works
Storm Drains I Cityof CarlsbadPublicWorks
7- 8 WORK SITE MAINTENANCE.
7- 8. 1 General.

Replace the second paragraph with the following:

The Contractor and all Subcontractors are required to clean up the site on a daily basis. This cleanup shall include, but not be limited to, the Contractor furnishing and operating a self -loading motorized street sweeper equipped with a functional water spray system or by hand ( depending on the size of the daily job/ cleanup), removal of all construction material that is no longer needed on the job site, daily removal of all construction rubbish/ trash away from the job site, proper storage of all construction equipment including traffic control devices that are not in use. The sweeper shall clean all paved areas within the Work site and all paved routes at least once each working day for the 06/24/2025
C10
105 of 352
purpose of keeping paved areas acceptably clean whenever construction, including restoration, is incomplete. It shall be the Contractor' s responsibility to keep vehicle and pedestrian travel ways broom clean at all times. Failure to comply with these daily cleanup requirements may result in the Agency performing the cleanup work and deducting the cost from the Contractor' s payment( s).

The sweeper shall be certified to conform to the South Coast Air Quality Management District' s SCAQMD) ( California) Rule 1186 requirements, which limit the amount of very fine particles of dust that can become airborne during sweeping operations. For additional information regarding SCAQMD' s Rule 1186, go to Internet URL website link at:
http:// www. aqmd. gov/ rules/ doc/ rll86/ rll86_ equip. pdf Upon completion and before making application for acceptance of the Work, the contractor shall clean the construction site and all ground occupied by him in connection with the Work of all rubbish, excess materials, temporary structures, and equipment. All parts of the Work area shall be left in a near and presentable condition.

Care should be taken to prevent spillage on streets over which hauling is done, and any such spillage or debris deposited on streets due to the Contractor' s operation shall be immediately cleaned up.

The Contractor shall remove and dispose of all structures, debris, or other obstructions to the construction of the Work as specified. Where such obstructions consist of improvements not required by law to be removed by the owner thereof, all such improvements shall be removed, maintained, and permanently replaced by the Contractor at his expense as required for performance of the Work.

The Contractor shall furnish all water necessary for compaction, cleaning, flushing, dust control, etc.

No separate payment will be made for any work performed or material used to control dust resulting from the Contractor' s performance of the Work, or by public traffic, either inside or outside the right- of-way.

Full compensation for conformingto the requirements of this Subsection 7- 8. 1 shall be considered as included in the various items of work involved and no additional compensation shall be allowed therefor.

Add the following paragraphs to this subsection:

EDCO Waste and Recycling Company has an exclusive franchise agreement with the Agency for waste hauling. If the Contractor requires waste disposal service, that service must be provided by EDCO. The Contractor is to make his own arrangements with EDCO and pay for all waste disposal, which is to be included in his overall Contract bid.

As a result of AB 939, the Agency has established a Construction and Demolition ( C& D) Recycling Ordinance ( Vista Municipal Code Chapter 13. 17) to help divert waste from landfills and to comply with mandates of the California Integrated Waste Management Board ( per City of Vista Ordinance No. 2006- 19). Many of the materials generated from construction and demolition projects can be recycled or reused. The Agency requires any contractor that generates debris to use a recycling service ( EDCO 95 06/24/2025
C10
106 of 352
or other Agency -approved recycling company) and fill out a Waste Management Plan ( WMP). The Contractor shall cooperate with the Agency' s Inspector and Agency' s Waste Management Compliance Officer in completing the WMP prior to obtaining the required " No Fee" Construction Permit. If you have any questions about the Agency' s Construction and Demolition Recycling Ordinance or how to get a copy of this form, please contact 760- 726- 1340 x 1264.

The Contractor shall provide copies of all receipts from EDCO and include all demolition costs in his construction bid.

Full compensation for furnishing all labor, materials, equipment and incidentals for clean- up and dust control as specified, including weekends and other non -working days at the Agency' s request, shall be considered as included in related items of work and no additional compensation will be allowed therefore.
7- 8. 2 Air Pollution Control.

Add the following paragraph:

All cold milling equipment, sandblast pots over one -hundred pounds ( 100 Ibs.), portable engines over fifty horsepower ( 50 HP), and auxiliary engines on construction equipment which are not used to drive equipment require permits from the San Diego County Air Pollution Control District ( SDAPCD).

The Contractor must obtain and maintain all required permits, and follow all permit requirements. 7- 8. 3 Noise Control.

Add the following paragraphs:

The Contractor shall comply with local ordinances regulating noise level ( see Vista Municipal Code Chapter 8. 32).

All construction activities ( including, but not limited to, the use of tools, machinery or equipment used in connection with construction operations), regardless of hours of operation, shall be kept below an average hourly sound level of seventy- five ( 75) dBA Leq measured at fifty feet ( 50') from the noise source. A noise level limit of ninety- five ( 95) dB at a distance of fifty feet ( 50') shall apply to all construction equipment on or related to the job whether owned by the Contractor or not. Examples include but are not limited to: equipment startups, equipment staging in or near the project, truck deliveries to the project, construction traffic loud talking, etc.

This ordinance applies to all grading operations and all public improvement construction on private or public property.

The Contractor shall not perform high -noise producing work ( e.g. jack - hammering, saw -cutting, sand blasting, cold milling, compacting, etc.) between the hours of 10: OOPM and 7:OOAM, unless the Contractor is directed to perform work at night as part of a unique project, to avoid excessive impacts to traffic, businesses, or schools. The Contractor shall provide written notification to all residential properties within five hundred feet ( 500') of the work zone at least seventy- two ( 72) hours in advance M.
06/24/2025
C10
107 of 352
of performing: 1) work during these hours; 2) high -noise producing during working hours. The proposed notification form and list of properties shall be submitted to the Engineer for approval.

Stationary construction equipment shall be placed such that emitted noises are directed away from sensitive noise receivers such as residential uses. The Contractor shall make every effort to create the greatest distance between noise sources and receptors during construction operations.

The Contractor shall use only such equipment on the Work and in such state or repair, that the emission of sound therefrom is within the noise tolerance level of that equipment, as established by accepted standards of the industry. Should the Agency determine that the muffling device on any equipment used on the Work is ineffective or defective so that the noise tolerance of such equipment, as established by accepted standards of the industry, is exceeded, such equipment shall not, after such determination by the Agency, be used on the Work until its muffling device is repaired or replaced so as to bring the noise tolerance level of such equipment within such standards. 7- 8. 4 Storage of Equipment and Materials.
7- 8.4. 1 General.

Add the following paragraphs:

The Contractor may use available spaces at the Public Works Satellite Yard on 2430 Lupine Hills Drive, as a staging area, at his own risk. The Contractor shall deliver all salvaged materials owned by the City of Vista or Buena Sanitation District, except for traffic signs, to this yard. Salvaged traffic signs shall be delivered to the Agency' s Public Works Yard at 1165 E. Taylor Street. The Contractor shall first coordinate with the Wastewater Supervisor at City of Vista Public Works, obtain written permission from the Public Works Department, and obtain a key and lock from them, before usingthe yard for any purpose. The Contractor shall return the site to its pre- existing condition after using any area for staying or storing materials or equipment.

The Contractor may be allowed to lease space at the south yard at the Encina Wastewater Authority near 6200 Avenida Encinas. Contact Encina at 760- 438- 3941 for requirements and details.

The Contractor shall implement and maintain all appropriate storm water pollution prevention BMP' s to prevent discharges from the staging and storage areas. If the Contractor chooses to use any of the possible staging areas, any adjacent sewer easements and access roads must remain accessible to Vista Public Works and Sanitation crews at all times of the day or night. After using any area for staging or storing materials or equipment, the Contractor shall clean up the staging and storage areas used for the project, and return them to their pre- existing condition, to the satisfaction of the Engineer, Encina and the Public Works Supervisor.

The Contractor shall obtain and maintain, at his own cost, a construction staging area outside of the right of way or outside the boundaries of the Agency' s property, unless a staging area is specifically shown on the Plans or described in the specifications. Any posted signs for or related to the staging area must be of professional quality and approved by the Engineer prior to placement. The staging area must be established, maintained and removed in a manner acceptable to the Engineer and the owner of the land where the staging area is situated. The Contractor shall be solely responsible for 97 06/24/2025
C10
108 of 352
the security and liability of the staging area. The staging area maybe fenced, lighted and locked. Guard dogs are not allowed at the construction staging area. Such staging areas shall meet all requirements of applicable standards, codes, ordinances and laws, and shall be established at least five ( 5) Working Days prior to commencement of work.

When any product, material or equipment is to be stored outside the highway or street right- of-way or Agency property, the Contractor shall first obtain written permission from the property owner on whose property the storage is to be made. The Contractor shall file with the Engineer an original permission letter, together with a written release from the property owner absolving the Agency or its employees from any and all responsibility in connection with storage of materials, products or equipment on said property.
7- 8.4. 3 Storage on Private Property.
7-8. 4.3 Storage on Private Property. The Contractor and all Subcontractors shall minimize the effects of construction operations upon private properties adjacent to the Work.

Prior to storing equipment or material on private property, the Contractor shall provide copies of all letters of permission or written agreements executed by affected property owners for the purpose of granting trespass rights to enter upon, stockpile or store Contractor' s supplies and equipment to the Engineer. The Contractor shall, as a penalty to the Agency, forfeit one hundred dollars ($ 100) per day as a fine for each parcel as determined by the Engineer for failure to provide copies of such documentation to the Engineer prior to storing equipment or material on private property. Said fine or fines will be deducted from the Contractor' s subsequent monthly progress payment. The Contractor is solely responsible to initiate contact and negotiate agreement with property owners if the Contractor should desire to use private property for storage or other purposes.

Materials or equipment placed on private property without owner' s consent or in breach of owner/ contractor Contract shall constitute ground for immediate issuance of a stop work notice to the Contractor. The Contractor shall then be required to suspend all operations until affected property is cleaned up and restored to original condition. Additional Contract days will not be granted due to stop work action against Contractor.
7- 8. 5. 3 Spill Prevention and Emergency Response Plan.

Add the following paragraphs to this subsection:

For any Project that involves the public sewer system, the Contractor shall develop and submit to the Engineer prior to the start of construction, for review and approval, a written Spill Prevention and Emergency Response Plan in accordance with Subsection 2-5. 3 (" Submittals."). The Contractor shall comply with the State regulations for No Spills and is responsible for preventing and containing any sewage spillage. The Spill Prevention and Emergency Response Plan shall be developed to respond to any construction related sewage spill( s). This plan shall include but is not limited to:
06/24/2025
C10
109 of 352
11 Identifying all nearby environmentally - sensitive areas such as waterways, channels, catch basins and entrances to existing storm drains.
21 Furnishing all necessary materials, supplies, tools, equipment, labor, and other services for spill containment and cleanup.
3] Making arrangements for an emergency response unit, stationed at or near the job site, comprised of emergency response equipment and trained personnel to be immediately dispatched in the event of a sewage spill( s). This could also include field biologists and/ or archaeologists, if in an environmentally - sensitive area such as a canyon. 41 Developing an emergency notification procedure, this includes an emergency response team roster with telephone numbers and arrangements for backup personnel and equipment, and an emergency notification roster of the designated Agency representatives. The emergency response unit shall be able to dispatch to the site twenty- four ( 24) hours a day seven ( 7) days a week including weekends and holidays. The Contractor shall designate primary and secondary representatives, their respective landline phone and cell phone numbers. These Contractor' s representatives shall be accessible and available at all times to respond immediately to any sewer spill event.
5] Identifying any property owners who maybe affected.

In case of a sewage spill( s), the Contractor shall act immediately without instructions from the Agency, to control the spill and take all appropriate steps to contain it in accordance with the Spill Prevention and Emergency Response Plan and this subsection. The Contractor shall immediately notify the Agency of the spill, describe all actions taken and shall report the Project name, location, and name of the Contractor. The Contractor shall, within three ( 3) Working Days from the occurrence of the spill, submit to the Engineer a written report describing the following information related to the spill:
1] The location ( using Thomas Guide Map pages and grids) of the spill. 2] The nature and estimated volume of the spill.
3] The date and time of the spill.
4] The duration of the spill.
5] The cause of the spill.
6] The type of remedial and/ or clean up measures taken ( including erosion control measures) and the date and time of implementation.
7] The corrective and/ or preventive actions taken to avoid the possibility of a recurrence. 8] The equipment used in spill response.
9] The environmentally - sensitive habitat such as a water body, if any, impacted. 01 06/24/2025
C10
110 of 352
10] The results of any necessary monitoring.
111 A list of who from the Agency was notified, and date / time of notification. 12] The date and time Contractor was notified of the spill. 13] The date and time Contractor arrived on site.

The Contractor shall exercise care not to damage existing public and private improvements, interrupt existing services and/ or facility operations that may cause a sewage spill. Any utility and/ or improvement damaged by the Contractor shall be immediately repaired at the Contractor' s expense.

If the construction operations damage an existing utility or damage or interrupt an existingservice that causes a sewer spill, the Contractor shall immediately notify the Agency representatives. The Contractor shall take all measures necessary to prevent further damage or service interruption to an impacted utility or service. The Contractor is responsible for any resulting sewage spill( s) from the Contractor' s work.

The Engineer may institute further corrective actions, as deemed necessary, to fully comply with existing laws, ordinances, codes, order or other pertinent regulations. The Contractor shall be responsible for all costs incurred for the corrective actions including mitigation measures ( habitat restoration, etc.) and obtaining after -the -fact permits if necessary, in environmentally sensitive areas.

These permits may include, but are not limited to, those from the Agency' s Engineering Department or Community Development Department, California Coastal Commission, U. S. Army Corps of Engineers and the California Department of Fish and Game.

It shall be the Contractor' s responsibility to assure that all field forces, including subcontractors, know and obey all safety and emergency procedures, including the Spill Response Plan applicable to the Work, to be maintained and followed at the job site. If in an environmentally sensitive area, such as canyon, stream, or lagoon, impacts must be minimized. Crews must be aware at the start of the job of any sensitive environmental habitats, breeding season restrictions, etc.

The Contractor shall take extreme care to prevent spills when working on sewer lines such as when making temporary connection and when connecting new lines into the sewer system. The Contractor shall not trap debris and/ or discharge rock or debris downstream.

If a sewer bypass is called for in the Plans and/ or Specifications or is needed to construct the Project, the Contractor is responsible for continuously monitoring the flow levels downstream and upstream of the construction location. This will allow the Contractor to make the earliest possible determination of a system failure that may result in a sewage backup and spill. The Contractor shall include the means and methods of monitoring the flow in the Spill Prevention and Emergency Response Plan.

The Contractor is responsible for the recovery and legal disposal of any spilled sewage and liability arising from causing a sewage spillage and shall defend, indemnify, protect, and hold harmless the Agency, its agents, officers, and employees, from and against all claims asserted, or liability established for damages or injuries to any person or property resulting from any sewage spill caused or claimed to be caused by the Contractor' s action or failure to take measures to prevent a spill. The 100
06/24/2025
C10
111 of 352
Contractor shall also be responsible for payment of any fines and/ or penalties assessed against the Agency for such sewage spills. The Contractor' s duty to indemnify and hold harmless shall not include any claims or liability arising from the established sole negligence or willful misconduct of the Agency, its agents, officers or employees.

The Contractor shall obtain and maintain an additional insurance coverage for Pollution Liability with its limits and requirements as set forth in Subsection 7- 3 (" LIABILITY INSURANCE."). The limits and requirements for pollution liability shall be in an amount sufficient to cover potential losses from sudden and accidental pollution. Unless otherwise provided for in the BID PROPOSAL, all costs associated with the requirements for " Sewage Spill Response Plan," including additional insurance, shall be included in the prices for other related bid items. Atthe request of the Engineer, the Contractor may be required to submit a cost breakdown for the items required to comply with the " Spill Prevention and Emergency Response Plan."
7- 8. 6 Water Pollution Control.
7- 8. 6. 1 General.

Add the following to this subsection:

The Contractor shall adhere to, the requirements of the San Diego Regional Water Quality Control Board RWQCB). All work shall be performed in accordance with ORDER NO. R9-2013- 0001, AS AMENDED BY ORDER NOS. R9- 2015- 0001 AND R9- 2015- 0100 NPDES NO. CAS0109266 - NATIONAL POLLUTANT DISCHARGE

ELIMINATION SYSTEM ( NPDES) PERMIT AND WASTE DISCHARGE REQUIREMENTS FOR DISCHARGES FROM THE MUNICIPAL SEPARATE STORM SEWER SYSTEMS ( MS4s) DRAINING THE WATERSHEDS WITHIN THE SAN DIEGO REGION, which can be found on the Internet at:
http:// www. waterboards. ca. gov/ rwgcb9/ water issues/ programs/ stormwater/ index. shtmI The Contractor shall adhere to, and shall perform in accordance with the requirements of Vista Municipal Code Chapter 13. 18 - Storm Water Management and Discharge Control Program.

The Contractor shall submit an erosion control plan showing all pollution prevention, erosion and sediment control, and site management practices, to the City Engineer for review and approval, and shall implement and maintain all appropriate measures to prevent polluted discharges from entering storm water conveyance facilities ( e.g. channels, storm drains, and water bodies). The Storm Water Management Permit application and erosion control plan must be prepared and submitted by the Contractor and approved by the City Engineer before any land disturbance activities can take place on the construction site.

For projects not subject to the Construction General Permit, before commencement, and until final acceptance of the Work by the City, the Contractor shall provide all measures necessary to avoid erosion and adverse drainage conditions, in conformance with the current Order and the City of Carlsbad requirements.
7- 8. 6. 1. 1 Compliance.
101
06/24/2025
C10
112 of 352
Add the following to this new subsection:

The Contractor shall make every effort to comply with the provisions of this subsection. However, should the Contractor violate any of the provisions of this subsection, or if pollution occurs in the work area for any reason, the Contractor shall immediately notify the City Engineer. If an unmitigated non - storm water discharge leaves the construction site, the Contractor shall immediately stop all the activity causing the discharge and mitigate the discharge and immediately notify the City Engineer or call the Storm Water Hotline at 760- 726- 1340 X 1686. In addition the Contractor shall, with seven 7) calendar days, submit written confirmation to the City Engineer describing the incident and corrective actions taken. If pollution, for whatever reason, is detected by the City Engineer before notification by the Contractor, the required written confirmation shall also include any explanation of why the Contractor had not notified the City Engineer.

As soon as practical, any and all waste material, sediment, debris or other pollution from any discharge shall be removed from the work area and/ or the drainage system by the Contractor. Any remedial actions will be the sole responsibility of the Contractor.

The Agency may make any further corrective actions, as deemed necessary, for abatement of water pollution if the Contractor has violated any of the provisions of this subsection. The Contractor shall be responsible for all costs incurred for the corrective actions. Failure to comply with the requirements of this subsection may result in the suspension of Work per Subsections 6-3 and 6- 6.3 SUSPENSION OF THE WORK." and " Paymentfor Delays."). The City' s Municipal Code ( Vista Municipal Code) Section 13. 18. 200 allows for administrative, misdemeanor penalties, infractions, and civil actions for non- compliance and enforcement actions that include stop work orders. Failure may also result in significant fines and possible imprisonment. A prosecuting authority may assess fines of up to $ 37, 500 per calendar day for each violation. The Contractor shall also reimburse the Agency for any fines assessed against and paid by the Agency and that are the result of the Contractor' s failure to comply with these specifications.

Compliance with the requirements of this subsection shall in no way relieve the Contractor from its responsibility to comply with other provisions of the Contract, in particular its responsibility for repair of damage and for preservation of property.
7- 8. 6. 2 Best Management Practices ( BMPs).

Add the following to this subsection:

Prior to commencement of any land disturbance activities, the Contractor shall educate all employees, subcontractors, and suppliers about storm water pollution prevention and mitigation measures needed during various construction activities to prevent the impacts originating from construction discharges. The Contractor shall ensure that all personnel are periodically trained in storm water and urban runoff management. A list of attendees and copies of the educational materials shall be kept on file at the site and submitted to the City Engineer at the conclusion of each training session, upon request.

The Contractor shall designate a qualified person who is trained and competent in the use of Best Management Practices ( BMPs) and who shall be on the site daily to evaluate the conditions of the site 102
06/24/2025
C10
113 of 352
with respect to storm water pollution prevention. This person shall ensure the implementation of the conditions of the Contract Documents, and other State and local regulations and ordinances with respect to the control of erosion, sediment and other forms of water pollution, as well as other waste management regulations.

The Contractor shall implement pollution control measures and BMPs to prevent the impounding of runoff, nuisance water, sediment movement, and debris movement from the construction site onto adjacent properties or from adjacent properties onto the construction site. If the City Engineer determines that the Contractor' s measures are not adequate, the Contractor shall provide whatever additional measures are required to gain compliance.

The Contractor shall protect with BMPs, such as gravel bags and filter fabric, all new and existing storm water conveyance system structures and other facilities from sedimentation or other related construction debris and discharges, or by any other equal product that is acceptable to the City Engineer. The Contractor shall schedule and conduct land disturbance operations, such as demolition, clearing, and grading, to minimize or avoid rain fall induced erosion and sediment discharges and prevent tracking at the construction site during ingress and egress. Water pollution control activities shall also consist of implementing good housekeeping BMPs to reduce the discharge of pollutants from construction sites. Such features as drainage gutters, slope protection blankets, and retention basins, if applicable to the site as described in the erosion control plan, shall be constructed prior to start of work. The Contractor shall prevent any discharge of concrete rinse water or other pollutant into a storm water conveyance facility by using physical barriers.

The Contractor shall maximize the preservation of existing native and non- native vegetation and minimize soil disturbance within the limits of Work.

The Contractor shall show on the erosion control plan all water pollution, erosion control, and sediment control BMPs for the Work including the locations for concrete washout, vehicle maintenance, staging, dispensing of fuel, and storage areas. Further, the Contractor shall show all pollutant control measures or BMPs to be used to confine construction waste in designated areas, including construction entrance stabilization and wheel -wash measures to reduce the tracking or deposition of sediment onto public and private roads.

During the dry season ( May 1 through September 30 each year), the Contractor shall inspect at least monthly all pollutant control measures or BMPs installed to mitigate construction activities during the dry season. During the rainy season ( October 1 through April 30 each year), the Contractor shall inspect at least weekly all pollutant control measures, inspect before and after every rain event and every twenty- four ( 24) hours during any prolonged rain event.

The Contractor shall implement the following water pollution control measures:
a) Minimum Water Quality Protection Requirements:
1) Eroded sediments and other pollutants must be retained on site and may not be transported from the Work site via sheet flow, swales, area drains, natural drainage, tracking by vehicles or equipment, or wind. Erosion from slopes and channels shall be controlled by implementing an effective combination of BMPs, such as the limiting of grading scheduled during the rainy season; planting and maintenance of vegetation on slopes; and cover to prevent or minimize erosion of susceptible slopes. 103
06/24/2025
C10
114 of 352
2) Stockpiles of earth and other work -related materials must be protected from being transported from the site by wind or water.
3) Fuels, oils, solvents, and other toxic and non - toxic substances shall be stored in accordance with the manufacturers' instructions. All storage containers shall be protected from the weather. Fuels, oils, solvents, and other toxic substances originating from the Contractor' s operations shall not be allowed to contaminate the soil, storm water or surface waters or enter the ground water or be placed where they will enter a live stream, channel, drain, or other water conveyance facility.
4) The Contractor may not wash excess or waste concrete onto the ground or into the public rights of way or any drainage system. Provisions shall be made to retain concrete wastes onsite with containment until it can be appropriately disposed of or recycled. 5) Trash and construction - related solid wastes must be deposited into a covered receptacle to prevent contamination of rainwater and dispersal by wind. 6) Vehicle and equipment traffic shall not track sediments and other materials from the construction site. The Contractor must stabilize the entrance roadways to the construction site to inhibit sediments from being deposited into the public rights of ways. Accidental depositions must be swept up immediately and may not be washed down by rain or by any other means. All loose soil and debris shall be removed from street areas upon starting operations and periodically thereafter as directed by the City Engineer. 7) Non -storm water, wash water and runoff from equipment and vehicle washing and any other activity shall be contained at the construction site. 8) The Contractor shall protect all new and existing storm drain system structures from sedimentation, or other construction related debris and discharges with gravel bags and filter fabric or by any other equal product or measure acceptable to the City Engineer.

Accumulated debris shall be cleaned up and properly disposed of by the Contractor to prevent the materials from entering or being carried into storm water conveyances. 9) When making sawcuts in pavement, use as little water as possible and perform during dry weather. Cover each storm drain inlet completely with filter fabric or plastic during the sawing operation and contain the slurry by placing straw bales, sandbags, or gravel dams around the inlets. After the liquid drains or evaporates, shovel or vacuum the slurry residue from the pavement or gutter and remove from site. Alternatively, a small onsite vacuum may be used to pick up the slurry as this will prohibit slurry from reaching storm drain inlets.
10) Pavement marking:

Schedule pavement marking activities for dry weather.

Develop paint handling procedures for proper use, storage, and disposal of paints.

Transfer and load paint and hot thermoplastic away from storm drain inlets.

Provide drop cloths and drip pans in paint mixing areas.

Properly maintain application equipment.

Street sweep all grindings. Yellow thermoplastic grindings may require special handling as they may contain lead.

Paints containing lead or tributyltin are considered a hazardous waste and must be disposed of properly.

Use water based paints whenever possible. If using water based paints, clean the application equipment in a sink that is connected to the sanitary sewer.

Properly store leftover paints if they are to be kept for the next job, or dispose of properly.
104
06/24/2025
C10
115 of 352
11) After the completion of the Work, the construction site shall be cleared of trash and debris and restored to a condition equal to or better than that existing before construction by completing all approved landscaping and permanent or post -construction sediment controls.
b) Erosion Control Plan
Whenever it appears that the construction site will have grading during the rainy season, or as requested by the City Engineer, the Contractor shall be prepared to execute a rain event action plan based on implementation of BMPs as specified in the Project' s Erosion Control Plan.

The Contractor shall mark with a stencil, concrete stamp, or ceramic tile every storm drain inlet within the Project boundaries to indicate that no dumping is allowed in storm drainage facilities that discharge in the ocean. The stencil or tiles are available from the City Engineer, with five ( 5) Working Days advance notice. On curb inlets, the stencil shall be placed at the curb line on the inlet roof, the stamp should be placed on the inlet roof or in the sidewalk behind the inlet, and the tile shall be affixed to the gutter with pavement - marker adhesive or inset in the concrete in the center of the inlet opening.

On catch basins, the stencil, stamp, and tile shall be placed or imprinted next to the inlet grate. Extra concrete may be required next to the grate to accommodate the stencil, stamp, or tile dimensions. 7- 8. 6. 5 Payment.

Replace the paragraphs in this subsection with the following:

All costs for the work required to comply with the requirements of this subsection shall be included in the bid item for Storm Water Pollution Prevention and Erosion Control as shown on the BID SCHEDULE. If no bid item is provided, the cost of the work required to comply with this subsection shall be considered as included in the prices bid for the various items of work. 7- 9 PROTECTION AND RESTORATION OF EXISTING IMPROVEMENTS.

Add the following paragraphs:

The Contractor shall exercise due care to avoid injury to existing improvements or facilities, utility facilities, signage, adjacent property, trees, turf, lawn and shrubbery that are to be relocated or not to be removed.

All trees, turf, lawn, and shrubbery that are not to be removed, and pole lines, fences, signs, survey markers and monuments, buildings and structures, conduits, pipelines under or above ground, sewer and waterlines, highway or street signs and facilities, and any other improvements or facilities within or adjacent to the Work shall be protected from damage. The Contractor shall provide and install suitable safeguards to protect such objects from damage. Relocations, repairs, replacements or reestablishments shall be equal to the existing improvements and shall match such improvements in finish and dimensions unless otherwise specified as approved by the Engineer.

In addition to any requirements imposed by law, the Contractor shall shore up, brace, underpin, and protect, as may be necessary, all foundations and other parts of all existing structures, and all portions of other existing facilities including waterlines, storm drains, and sewer lines, adjacent to 105
06/24/2025
C10
116 of 352
and adjoining the site of the Work, which are in any way affected by the excavations or other operations connected with the performance of the Work.

The Contractor shall maintain all existing roadside mailboxes and official signs other than those called for removal, including but not limited to directional, warning, advisory, regulatory and street markers. The mailboxes and signs shall be maintained in an erect and functional position and condition at all times during the construction period in either temporary or permanent location as designated by the Engineer. Any of these facilities which are damaged or lost shall be replaced by the Contractor at no cost to the Agency.

The Contractor shall maintain in operation all existing traffic signals and street lighting for the benefit of the public during the progress of the Work. Existing electric services, traffic signal equipment, traffic signs, and street lights that are being replaced or relocated shall remain in service until the replacement facilities are installed and operational or useable).

All costs involved in protection and restoration of existing improvements shall be included in related items of work and no additional compensation shall be allowed therefore. 7- 10 PUBLIC CONVENIENCE AND SAFETY.
7- 10. 1 Access.
7- 10. 1. 1 General.

Add the following paragraphs:

The Contractor shall make every effort to keep driveways open during working hours. After hours all driveways shall be accessible with smooth and safe crossings through the construction. 7- 10. 2 Work Area Traffic Control.
7- 10. 2. 1 General.

Add the following paragraph:

The Contractor shall prepare and submit a traffic control, construction phasing, and detour plan for approval by the Agency, showing how traffic and access will be maintained during the work.

At least two ( 2) lanes of traffic, one in each direction, must be kept open during construction periods on all streets. The Contractor shall furnish, install and maintain all necessary and appropriate signing and striping for lane closures to accommodate the work zone.

Emergency vehicles shall be permitted to pass through the work area without delay at all times.

Work shall be performed in a portion of the street section while the remainder of the street section is kept open and unobstructed until the newly -constructed improvements are ready for use by traffic.

The Contractor shall phase the removal operations so as to maintain the specified traffic lanes on existing pavement until sufficient new pavement is constructed to accommodate the traffic 106
06/24/2025
C10
117 of 352
requirements. A smooth, even surface and a condition satisfactory for traffic shall be maintained on the portion of street where the two -directional traffic is being maintained.

The Contractor shall cooperate with local authorities relative to handling local traffic and providing access to necessary services through the area and shall make his own arrangements relative to keeping the working area clear of parked vehicles.

If temporary ' No Parking' zones are part of the approved Traffic Control Plan, the Contractor shall be responsible for furnishing and posting temporary ' No Parking' signs a minimum of forty- eight ( 48) hours in advance of work. Signs shall have the correct legend and any other necessary information such as hours of the day; days of the week; dates that the temporary ' No Parking' zone applies; and citation of the applicable section of the California Vehicle Code or the Vista Municipal Code. Signs shall be posted at one -hundred foot ( 100') maximum intervals along the approved temporary ' No Parking' zone. Signs may be attached to existing sign and street light poles in the public right- of-way as approved in the Traffic Control Plan. When necessary to meet the spacing requirement or to ensure sign visibility, the Contractor shall furnish posts or barricades. The Contractor is responsible for the removal of all temporary " No Parking" signs and fasteners or tape used after the Work is completed on each street or alley.

The Contractor shall be responsible for furnishing and posting temporary ' No Parking' signs along all streets approved for closure. In addition to other requirements for temporary " No Parking" signs, No Parking" signs for temporary road closures shall be posted at one -hundred foot ( 100') maximum intervals on each side of the street to be closed, at all intersections, and ends of all cul- de- sac streets.

Implementation of traffic control devices per the approved Traffic Control Plan may not begin each workday before the hours specified on the approved Traffic Control Plan. In addition, construction work must be stopped before the end of the approved work period to allow sufficient time for all traffic control devices to be removed and for other devices and measures to be in place and operational as shown on the approved Traffic Control Plans within the specified time restrictions. The Contractor shall make adjustments to the construction staging and provide any required improvements or additional facilities, including temporary trench steel plate covers, temporary asphalt concrete pavement, barricades and delineators, and temporary signing and striping, which are necessary to make the work site functional and safe at all times. Improvements and facilities necessary to make the work site functional and safe shall be submitted to the Agency' s Traffic engineer for approval as part of the Traffic Control Plan.

Adequate drainage facilities shall be provided to maintain the traveled pavement surface in a condition free from ponding or running water. Water shall not be diverted from existing courses or allowed to pond on private property without the explicit permission, in writing, from the property owner.

Trenches in streets open to traffic shall be provided with temporary pavement surfacing, to maintain a smooth paved travel surface, if the street is not to be provided with permanent pavement surfacing within forty- eight ( 48) hours after pavement removal. Trench steel plate covers shall be recessed and even with the pavement surface and not be left in place longer than four ( 4) consecutive Working Days.
107
06/24/2025
C10
118 of 352
7- 10. 2. 2 Traffic Control Plan ( TCP).
7- 10. 2. 2. 1 General.

Add the following paragraphs:

The Contractor shall be prepared to discuss the traffic control plan and issues related to traffic control and access at the Pre -Construction Meeting. The Contractor shall submit traffic control plans for approval per Subsection 2- 5. 3. 4 (" Supporting Information.") at least ten ( 10) Working Days prior to commencement of work. All phases of the traffic control plans shall be prepared by a California licensed Traffic Control Services Consultant ( C31 Contractor' s License - Construction Zone traffic Control Contractor) or a California registered Civil or Traffic Engineer and performed in conformance to the requirements of the latest editions of the California Manual on Uniform Traffic Control Devices CA MUTCD) for Streets and Highways, Caltrans Standard Specifications and Standard Plans, the Traffic Control Plans included in the latest edition of the San Diego Regional Standard Drawings SDRSD), and the WATCH Manual ( Work Area Traffic Control Handbook). No work shall commence until this plan and each construction phase of the Work that significantly affects existing traffic operations has been reviewed and approved by the Engineer.

The Contractor' s Traffic Control Plan shall list the Working Days and Hours scheduled for each street and each phase of the work, as described in these Specifications.

The relocation and / or installation of traffic and / or parking signs and other directional signage, as required on the Plans, shall conform to the City of Carlsbad Standards, the California Manual on Uniform Traffic Control Devices ( CA MUTCD), Caltrans Standard Plans and Standard Specifications, San Diego Regional Standard Drawings ( SDRSD), and all current ADA regulations All signs, including those to be relocated or replaced, need to have their new locations approved bythe Traffic Engineering Division of the Engineering Department before placement. If not otherwise specified, the work required for Traffic Striping and Signing shall conform to these specifications and those in Section 314.

All signing, including " DETOUR AHEAD" signs and " OPEN DURING CONSTRUCTION" signs shall be proposed by the traffic control plan. The Engineer may direct alteration of the above sign messages and locations.

All traffic lanes shall have a minimum width of eleven feet ( 11') unless otherwise specified. In addition to the lane width specified herein, the Contractor shall maintain a clearance of two feet ( 2') feet to curbs, barricades, and other vertical obstructions.

It shall be the Contractor' s responsibility to notify the appropriate utility companies at least two weeks in advance, when access to the public right- of- way is altered in any way. Notifications by the Contractor shall be in writing, with proof of receipt. Copies of each notification and proof of receipt shall be submitted to the Engineer.
7- 10. 2. 2. 2 Payment.
1:
06/24/2025
C10
119 of 352
Add the following paragraph:

Full compensation for ( single or multi -phase) Traffic Control Plan and Construction Staging and furnishing Project traffic control, including the cost of all barricades, signs, all variable message signs, tools, equipment, incidentals, flagmen, providing notices, asphalt concrete and aggregate base for temporary resurfacing ( and its removal), temporary conflicting traffic stripe application and grinded removal, trench steel plate cover installation and removal, and any other safety measures used for the control of traffic, any temporary rerouting of traffic or maintenance of access to properties during the Project construction period shall be paid for by the lump sum price bid as shown on the BID SCHEDULE and no additional compensation will be allowed.
7- 10. 4 Safety.
7- 10. 4. 1 Work Site Safety.

Add the following new subsection:
7- 10. 4. 1.3 Safety for Night Work.
7- 10. 4. 1.3 Safety for Night Work. The delineation of the Work that will need to be performed at night during certain phases of the Project shall be indicated on the Traffic Control Plans. The Contractor shall conduct all work in a safe manner, but shall provide additional safety measures at night to ensure the safety of the public, the work force, Agency and utility staff, and anyone else who passes through or works in the Project area. All light fixtures shall be mounted and directed in a manner precluding glare to approaching traffic.

The Contractor shall submit a detailed written night work plan, which includes night -related traffic control equipment and materials, site safety rules, and safety training materials.

Payment for performing all work necessary to provide safety measures for night work shall be included in the bid items for which night work is required.

Add the following new subsection:
7- 10. 4. 1.4 Flood Lighting for Night Work.
7- 10. 4. 1. 4. 1 General.
7- 10. 4. 1.4. 1 General. When Night Work is being performed floodlights shall be used to illuminate the Work Site, flagger stations, equipment crossings and other hazardous areas. The flood lighting shall provide enough light to illuminate flagger stations, equipment crossing sand other hazardous areas so they are visible for a distance of one- half ( 0. 5) mile. Care shall be exercised to ensure that the flood lights do not shine into the eyes of oncoming traffic. Flood Lighting is not required when adequate street lighting systems are available and maintained as specified in Section 307 (" STREET LIGHTING AND TRAFFIC SIGNAL SYSTEMS.")
Add the following new subsection:
7- 10. 4. 1. 4. 2 Payment.
109
06/24/2025
C10
120 of 352
7- 10. 4. 1. 4. 2 Payment. The cost of furnishing, installing and maintain flood lighting shall be considered as included in the prices Bid for the various items of Work. 7- 10. 4. 2 Safety Orders.
7- 10. 4. 2. 1 General.

Add the following paragraphs to this subsection:

In accordance with generally accepted construction practices, the Contractor shall be solely and completely responsible for conditions of thejob site, includingsafety of all persons and property during performance of the Work, and the Contractor shall fully comply with all OSHA, State and Federal laws, rules, regulations and orders relating to safety of the public and workers.

Whenever, in the opinion of the Engineer, an emergency exists against which the Contractor has not taken sufficient precaution for the public safety, protection of utilities and protection of adjacent structures or property which may be damaged by the Contractor' s operations, and when in the opinion of the Engineer, immediate action shall be considered necessary in order to protect the public or property adjacent to the Contractor' s operations under this contract, the Engineer will order the Contractor to provide a remedy for the unsafe condition. If the Contractor fails to act on the situation, the Engineer may provide suitable protection to said interests by causing such work to be done and material to be furnished as may be necessary.

The cost and expense of said labor and material, together with the cost and expense of such repairs as are deemed necessary, shall be borne by the Contractor. All expenses by the Agency for emergency repairs will be deducted from the progress payments and the final payments due to the Contractor. However, if the Agency does not take such remedial measures, the Contractor is not relieved of the full responsibility for public safety.

The acceptance by the Agency of a copy of the State of California Department of Industrial Relations Division of Occupational Safety & Health ( CaIOSHA) permit to perform excavation or trench work shall in no way be construed to impose tort liability on the Agency or any of its officers or employees by reason of any damage to person, including death or property damage resulting from or arising out of the use of such plan, and the Contractor shall be fully responsible for any such damage and shall indemnify and hold harmless the Agency, its officers and employees from any loss or liability resulting from the use of such plan.
7- 10. 5 Security and Protective Devices.
7- 10. 5. 3 Steel Plate Covers.

Add to this subsection the Special Provisions listed in Subsection 7- 10. 5. 3 (" Steel Plate Covers.") in the latest edition of the San Diego Regional Supplement to the Greenbook with the following modifications:

Revise c) of the second paragraph of Subsection 7- 10. 5. 3 (" Steel Plate Covers.") in the latest edition of the San Diego Regional Supplement to the Greenbook to read as follows:
110
06/24/2025
C10
121 of 352
The surface of all structural steel plate covers used by the Contractor to bridge any excavation in the public right- of- way shall have a non- skid coating (" Skid Guard" or equal) with a minimum coefficient of friction = 0. 35 per California Test Method 342 for all traffic steel plate covers within the traveled roadway of streets and alleys, and a minimum coefficient of friction of 0. 50 per ASTM C 1028 for those steel plate covers in pedestrian crosswalks or accessible areas. The non- skid coating shall be black.

When required by the Engineer, the Contractor shall certify in writing to the Agency that the steel plate covers to be used in the Work meet the required static coefficient of friction. Also when required by the Engineer, the Contractor shall have the steel plate covers to be used in the Work tested in accordance with the above standards for the verification of the required static coefficient of friction.

Testing shall be done by an independent laboratory approved by the Engineer. The Contractor shall pay for any costs associated with the testing of the steel plate covers.

Replace the third paragraph of Subsection 7- 10. 5.3 (" Steel Plate Covers.") ( Method 1) and Method 2)] in the latest edition of the San Diego Regional Supplement to the Greenbook to read as follows:

Within any improved area ( adjacent surface to trench is either asphalt or concrete), trench steel plate covers shall be recessed into the existing paved roadway surface equal to the depth of the plate thickness and to a width and length equal to the dimension of the plate by cold -milling.

Add the following paragraph to the end of Subsection 7- 10. 5. 3 (" Steel Plate Covers.") in the latest edition of the San Diego Regional Supplement to the Greenbook:

Payment for performing all work necessary to provide Steel Plate Covers shall be included in the various items of work that required the steel plate covers and no additional compensation will be allowed therefore.
7- 11 PATENT FEES OR ROYALTIES.

Replace the subsection in its entirety with the following:

The Contractor shall absorb in its Bid all costs arising from the use of patented materials, equipment, devices, or processes used in or incorporated in the Work and agrees to indemnify and hold harmless the Agency and its duly authorized representatives, from all suits of law, or actions of every nature for or on account of the use of any patented materials, equipment, devices or processes. 7- 12. 2 Public Notification.
7- 12. 2 Public Notification. The Contractor shall prepare typewritten Public Notification fliers in English and Spanish per the BID SCHEDULE. Fliers shall notify residents and businesses of the Work and include information describing the Work, how it may affect them and contact information of Agency and Contractor personnel responsible for the work. The Engineer will provide the contact information for the Agency to be included on the flier at the Pre -Construction Meeting. The Contractor shall submit draft versions of the flier in English and Spanish to the Engineer for review and approval prior to starting the 111
06/24/2025
C10
122 of 352
Work. The Contractor shall to provide advance notifications of the Work to residents and businesses adjacent to or affected by the Work by hand delivering " door knob type" fliers distributed at least five ( 5) Working Days prior to Work.

These notices shall also be distributed at other times during the Work as required to notify affected people in the area of impending work, including, but not limited to, prior to commencing rehabilitation, resurfacing, or reconstruction work on streets that will affect access to traffic or pedestrians.

Based upon the work schedule, the Contractor shall notify residents and businesses of the work and post temporary " No Parking" signs to all residences and businesses located in the work limits and along any detour routes.

The Contractor shall provide additional notification for night work that creates excessive noise, as described in Subsection 7- 8. 3 (" Noise Control.") of these Specifications.

Full compensation for the Public Notification shall include all necessary labor, equipment, materials, and all other related costs for preparation, copying, and distribution shall be considered as included in the lump sum price Bid for Public Notification.

Add the following new subsections:
7- 15 RESPONSIBILITY FOR DAMAGE.
7- 15 RESPONSIBILITY FOR DAMAGE. In addition to the provisions of Subsection 7-3 (" Liability Insurance.") of the Standard Specifications as between the Agency and the Contractor, the Contractor shall take and assume all responsibility for the Work as stated herein and/ or shown on the Plans.

The Contractor shall bear all losses and damages directly or indirectly resulting to him, to the Agency, the Engineer, their officers, employees, and agents, or to others on account of the performance or character of the work, unforeseen difficulties, accidents or any other causes whatsoever.

The Contractor shall assume the defense of and indemnify and save harmless the Agency, the Engineer, their officers, employees, and agents respectively from all claims, loss, damage, injury and liability of every kind, nature, and description, directly or indirectly arising from the performance of the Contractor work, regardless of responsibility for negligence; and from any and all claims, loss, damage, injury, and liability, howsoever the same may be caused, resulting directly or indirectly from the nature of the work covered by the Contract, regardless of responsibility for negligence.

The Agency does not, and shall not; waive any rights against the Contractor which it may have be reason of the aforesaid hold harmless agreements, because of the acceptance by the Agency or deposit with the Agency by Contractor, of any insurance policies required herein or as described in Subsection 7-3. The aforesaid hold harmless agreement by Contractor shall apply to all damages and claims for damages of every kind suffered, or alleged to have been suffered by reason of any of the aforesaid operations of Contractor, or any Subcontractor, regardless of whether or not such insurance policies are determined to be applicable to any of such damages or claims for damages. 112
06/24/2025
C10
123 of 352
No act by the Agency, Engineer or their representatives in processing or accepting any plans, in releasing any bond, in inspecting or accepting any work, or of any other nature, shall in any respect relieve the Contractor or anyone else, from any legal responsibility, obligation or liability he might otherwise have.
7- 16 INDEMNIFICATION.
7- 16 INDEMNIFICATION. Contractor shall defend ( with counsel of Agency' s choosing), indemnify and hold the Agency, its officials, officers, agents, employees, and representatives free and harmless from any and all claims, demands, causes of action, costs, expenses, liabilities, losses, damages or injuries, in law or equity, regardless of whether the allegations are false, fraudulent, or groundless, to property or persons, including wrongful death, to the extent arising out of or incident to any acts, omissions or willful misconduct of Contractor, its officials, officers, employees, agents, consultants and contractors arising out of or in connection with the performance of the Work or this Contract, including claims made by Subcontractors for nonpayment, including without limitation the payment of all consequential damages and other related costs and expenses. Contractor shall defend, at Contractor' s own cost, expense and risk, with counsel of Agency' s choosing, any and all such aforesaid suits, actions or other legal proceedings of every kind that may be brought or instituted against Agency, its officials, officers, agents, employees and representatives. To the extent of its liability, Contractor shall pay and satisfy any judgment, award or decree that may be rendered against Agency, its officials, officers, employees, agents, employees and representatives, in any such suit, action or other legal proceeding. Contractor shall reimburse Agency, its officials, officers, agents, employees and representatives for any and all costs incurred by each of them in connection therewith or in enforcing the indemnity herein provided. The only limitations on this provision shall be those imposed by Civil Code Section 2782.
7- 17 EMERGENCY PHONE NUMBERS.
7- 17 EMERGENCY PHONE NUMBERS. The Contractor shall provide the Engineer an emergency contact name and telephone number prior to the start of the Work that may be used to contact the Contractor in the event of an emergency for the duration of the Contract. Contractor shall also keep a list of emergency telephone numbers on the job site. In the case that more than ten ( 10) employees are on the job site at anytime, said list shall be posted on a bulletin board, to be supplied and installed on the job site by the Contractor in a location visible and accessible to all employees. 7- 18 DOCUMENT RETENTION & EXAMINATION.
7- 18 DOCUMENT RETENTION & EXAMINATION. In accordance with Government Code Section 8546. 7, records of both the Agency and the Contractor shall be subject to examination and audit by the State Auditor General for a period of three ( 3) years after final payment. Contractor shall make available to the Agency any of the Contractor' s other documents related to the Project immediately upon request of the Agency.

In addition to the State Auditor rights above, the Agency shall have the right to examine and audit all books, estimates, records, contracts, documents, bid documents, subcontracts, and other data of 113
06/24/2025
C10
124 of 352
the Contractor ( including computations and projections) related to negotiating, pricing, or performing the modification in order to evaluate the accuracy and completeness of the cost or pricing data at no additional cost to the Agency, for a period of four ( 4) years after final payment. 7- 19 STATE LICENSE BOARD NOTICE.
7- 19 STATE LICENSE BOARD NOTICE. Contractors are required by law to be licensed and regulated by the Contractors' State License Board which has jurisdiction to investigate complaints against contractors if a complaint regarding a patent act or omission is filed within four ( 4) years of the date of the alleged violation. A complaint regarding a latent actor omission pertaining to structural defects must be filed within ten ( 10) years of the date of the alleged violation. Any questions concerning a contractor may be referred to the Registrar, Contractors' State License Board, P.O. Box 26000, Sacramento, California 95826.

SECTION 9 - MEASUREMENT AND PAYMENT
9- 3 PAYMENT.
9- 3. 1 General.

Add the following paragraph:

Except as may otherwise be provided in specific instances, nothing in the Contract shall be construed as vesting in the Contractor any property, any material, article or structure existing at the time of the award of Contract within the area in which the Work is to be done or in any material, article or structure subsequently furnished forthe Work bythe Agency, or in any material, article, structure or Workfurnished or performed by the Contractor after having been accounted for on an approved estimate supporting the Contractor' s demand for payment as provided in Subsection 9-3 (" Payment.") of the Greenbook. In the latter event any such material, article, structure or Work shall become the property of the Agency after being so accounted for.
114
06/24/2025
C10
125 of 352
9- 3. 2 PARTIAL AND FINAL PAYMENT.

Replace the fifth paragraph of this subsection:

Pursuant to Section 22300 of the California Public Contract Code, the Contractor may substitute securities for any money held by the Agency to ensure performance of the Contract. At the request and expense of the Contractor, securities equivalent to the amount withheld shall be deposited with the Agency, or with a state or federally chartered bank as an escrow agent, who shall return such securities to the Contractor upon satisfactory completion of the Contract. Deposit of securities with an escrow agent shall be subject to written Contract in accordance with the provisions of Section 22300 of the California Public Contract Code. For purposes of the escrow agreement, the Agency shall not certify that the Contract has been completed until at least forty five ( 45) calendar days after filing by the Agency of a Notice of Completion. Securities eligible for investment under this Section shall be limited to those listed in Section 16430 of the California Government Code, bank or savings and loan certificates of deposit, interest bearing demand deposit accounts, standby letters of credit, or any other security mutually agreed upon by the Contractor and the Agency.

Add the following paragraphs to this subsection:

Requests for partial payments shall be submitted in a form satisfactory to the Agency. At a minimum, the form shall include all bid items, itemized breakdowns of lump sum bid items from the schedule of values ( provided by Contractor), unit or lump sum prices bid, the quantities of each bid item for the current and past invoices, the dollar amount of each bid item, a total amount, and the name, address and phone number of the Contractor.

The Contractor shall meet with the Engineer to field measure quantities, and if an agreement is NOT reached, the disputed quantities shall be documented at that time. The Contractor shall not include in his invoice any quantities that have not been approved by the Engineer. The Engineer will not be required to pay for any disputed quantities of work until an agreement is reached with respect to the actual quantity in place. The Engineer may make payments for disputed quantities of work based on his own estimate, until such time that an agreement is reached.

The Agency will make partial payments in accordance with Section 20104. 50 of the Public Contract Code, and these specifications. The Agency will pay progress payments within thirty ( 30) calendar days of receipt of an undisputed, complete and properly prepared payment request from the Contractor, or pay interest to the Contractor equivalent to the legal rate set forth in subdivision ( a) of Section 685. 010 of the Code of Civil Procedure.

Any payment request determined not to be a proper payment request suitable for payment shall be returned to the Contractor as soon as practicable, but not later than seven ( 7) calendar days, after receipt.

As part of the monthly request for partial payment, the Contractor shall submit:
115
06/24/2025
C10
126 of 352
11 A list of all subcontractors who worked on the project, along with their PWC Registration Number, so the Agency can ensure that all contractors and subcontractors are registered as required by Labor Code Section 1771. 1;
21 Conditional and unconditional lien releases for the Contractor and all subcontractors; 3] An updated construction schedule ( showing actual progress of the Work); 4] The Record Drawings ( updated to indicate all changes made up to the end of the billing period). 5] Certified payroll records to the Labor Commissioner' s Office; Monthly progress payments are conditioned upon the Agency having received from the Contractor the monthly schedule update and other specified documents.

Contractor shall provide to City, as a condition precedent to the payment of Contractor' s final retention, a complete list of all subcontractors who have worked on the Project, including their PWC Registration Numbers. This list must be provided at least 30 days prior to the payment of the final retention and shall be submitted under penalty of perjury.

The Agency is required by State Law to withhold final payment to the Contractor until at least 30 days after PWC-100 information has been submitted to the DIR, including the list of subcontractors who worked on the Project.

Add the following paragraphs to this subsection:

A prime contractor or subcontractor shall pay any subcontractor not later than ten ( 10) Working Days of receipt of each progress payment for satisfactory performance in accordance with the provision in Section 7108. 5 of the California Business Code concerning prompt payment to subcontractors. The ten ( 10) Working Days is applicable unless a longer period is agreed to in writing.

Any delay or postponement of payment over thirty ( 30) calendar days may take place only for good cause and with the Agency' s prior written approval. Any violation of Section 7108. 5 shall subject the violating contractor or subcontractor to the penalties, sanction, and other remedies of that section.

The Agency will hold retainage from the prime contractor and will make prompt and regular incremental acceptances of portions, as determined by the Agency of the Contract work, and pay retainage to the prime contractor based on these acceptances. The prime contractor, or subcontractor, shall return all monies withheld in retention from a subcontractor within seven ( 7) calendar days after receiving payment for work satisfactorily completed and accepted including incremental acceptances of portions of the Contract work by the Agency. 9- 3. 3 Delivered Materials.

Add the following paragraph to this subsection:

Progress payments may include payment for specialty materials that will remain permanent features of the Work, not incorporated in the Work, but delivered and suitably stored at the site or at another location, insured and bonded by the Contractor and agreed to, in writing, by the Engineer.

Payment for stored materials will be based on a cost breakdown, acceptable to the Engineer, indicating the value and installation costs of such materials, provided each individual item has a value of more 116
06/24/2025
C10
127 of 352
than five - thousand dollars ($ 5, 000). The Agency will pay a maximum of seventy- five percent ( 75%) of the value of the material, until such time as the material is permanently installed in the Work. The Contractor shall submit a bill of sale, invoice, or other documentation warranting that the Contractor has received the materials free and clear of liens, charges, security interests, and encumbrances, and evidence that the materials and equipment are covered by appropriate property insurance. 9- 3. 4 Mobilization.

Delete this subsection in its entirety and replace with the following. 9- 3. 4 Mobilization and Demobilization. Mobilization and Demobilization shall consist of preparatory work and operations, including, but is not limited to those necessary for the move -on and move - off operations such as:
1] Supplying, maintaining, and finally removing temporary facilities; including portable field office, sanitary facilities, electric power, water, telephone and other utilities, enclosures for storage of construction equipment, products / materials and incidentals; 2] Furnishing all insurance, bonds, licenses, materials, tools, equipment and incidentals involved in mobilization and preparatory work and operations, including, but not limited to, those necessary for the movement of personnel, equipment, supplies, and incidental to the project; for all other facilities, sureties, work and operations which must be performed or costs incurred prior to beginning work or various contractor items on or off the project site; 3] Making arrangements for construction personnel vehicle parking; 4] Application and acquiring permits from other agencies as required for the Project; 5] For other items not directly related to the bid items.

Payment for Mobilization and Demobilization shall be paid by the lump sum price bid as shown on the BID SCHEDULE. If the Mobilization and Demobilization bid item states a maximum percentage of total base bid on the BID SCHEDULE, the Agency reserves the right to conform the bid item price to the maximum stated percentage. When the Agency has to conform the bid item price to the maximum stated percentage, such action does not constitute a reason for the Contractor to withdraw their bid.

If no separate item is shown in the bid for mobilization and demobilization, then the Contractor shall include all costs in the various items of work.

Placement of facilities and storage of construction equipment and materials shall be approved in advance by the Engineer. All such facilities and equipment shall remain the property of the Contractor.

The Contractor shall be held responsible for all damage caused during mobilization and demobilization. The Contractor shall leave all storage areas in a neat clean condition, satisfactory to the Engineer and in accordance with the provisions of storage permits set by the property owner.

When a separate bid item is included in the BID SCHEDULE, payments for mobilization and demobilization will be made in accordance to the following schedule:
117
06/24/2025
C10
128 of 352
a] When the approved monthly partial payment estimate of the amount earned, not including the amount earned for mobilization and demobilization, is ten percent ( 10%) or more of the original Contract amount, twenty- five percent ( 25%) of the Contract item price for mobilization and demobilization will be included in the estimate for payment. b] When the approved monthly partial payment estimate of the amount earned, not including the amount earned for mobilization and demobilization, is twenty- five percent ( 25%) or more of the original Contract amount, the total amount earned for mobilization and demobilization shall be fifty percent ( 50%) of the Contract item price for mobilization and demobilization will be included in the estimate for payment.
c] When the approved monthly partial payment estimate of the amount earned, not includingthe amount earned for mobilization and demobilization, is fifty percent ( 50%) or more of the original Contract amount, the total amount earned for mobilization and demobilization shall be seventy- five percent ( 75%) of the Contract item price for mobilization and demobilization will be included in the estimate for payment.
d] When the approved monthly partial payment estimate of the amount earned, not including the amount earned for mobilization and demobilization, is seventy- five percent ( 75%) or more of the original Contract amount, the total amount earned for mobilization and demobilization shall be ninety- five percent ( 95%) of the Contract item price for mobilization and demobilization will be included in the estimate for payment.
e] After final acceptance of the Project, the remaining unpaid amount, of the Contract item price for mobilization will be included for payment in the final progress payment. 9- 4 BID ITEMS.

Add the following new subsection:
9- 4 BID ITEMS. Payment for the work included in each Bid Item shall be made at the actual quantity constructed, using the units listed in the BID SCHEDULE and the Unit Prices included in the BID. All other work shown or mentioned on the Plans, in the Specifications, or in any one of the Contract Documents shall be considered as included in the related Bid Items shown in the BID SCHEDULE. The Contractor must complete all work that is shown or described in the Contract Documents, whether or not there is a specific Bid Item for that work, and no additional compensation will be allowed.
118
06/24/2025
C10
129 of 352

SUPPLEMENTARY TECHNICAL PROVISIONS
EMERGENCY MODIFICATIONS - BUENA OUTFALL FORCEMAIN PHASE III PROJECT ( C. I. P. No. 8131) This section makes additions, deletions, or revisions to PART 2 - CONSTRUCTION MATERIALS, PART 3 - CONSTRUCTION METHODS, PART 4 - ALTERNATE ROCK PRODUCTS, ASPHALT CONCRETE, PORTLAND CEMENT CONCRETE AND UNTREATED BASE MATERIAL, AND PART 5 - SYSTEM REHABILITATION of the 2012 Standard Specifications for Public Works Construction (" Green book"). As a convenience, these additions and amendments have been arranged in a format that parallels the Greenbook. All sections and subsections which are not changed remain in full force and effect. Additional Special Provision sections and subsections may be included in these supplements which may be written in a format different from that of the Standard Specifications. These additional Special Provision sections and subsections are intended to complement the Standard Specifications.

PART 2 - CONSTRUCTION MATERIALS
SECTION 200 - ROCK PRODUCTS
200- 1 ROCK PRODUCTS.
200- 1. 1 General.

Add the following paragraph to this subsection:

In accordance with the provisions of Section 20676 of the State of California Public Contract Code, it shall be mandatory upon the Contractor to whom the Contract is awarded, and upon all subcontractors and suppliers under him, to obtain all construction aggregate, sand, gravel, crushed stone, road base, fill materials, and any other mineral materials, including those used in other construction materials such as asphalt concrete and Portland Cement concrete, from a supplier that is included on the most current Office of Mine Reclamation AB 3098 List ( per California Assembly Bill 3098). Failure to identify the supplier and the mine may result in rejection of the submittal, and any work completed using materials from an unlisted mine will be SUBJECT TO REJECTION. 200- 1. 6 Stone for Riprap.
200- 1. 6. 1 General.

Replace the second sentence in the first paragraph with the following:

Quarrystone shall be angular ( used for higher velocities) and cobblestone shall be rounded ( used for slower velocities).
200- 2 UNTREATED BASE MATERIALS.
200- 2. 1 General.

Add the following paragraph to this subsection:
119
06/24/2025
C10
130 of 352
Aggregate base shall be Class 2 per Subsection 26- 1.02A, " Class 2 Aggregate Base" of the Caltrans Standard Specifications, and associated AGGREGATE GRADING REQUIREMENTS and QUALITY REQUIREMENTS tables or Crushed Aggregate Base per Subsection 200- 2. 2 (" Crushed Aggregate Base.") and as shown in the gradation in TABLE 200- 2. 2. 2 of Subsection 200- 2. 2. 2 Grading.") of the Greenbook.

Aggregate may include up to one hundred percent ( 100%) material processed from reclaimed asphalt concrete, Portland Cement concrete, lean concrete base, cement treated base or a combination of any of these materials. It should be noted, this does not change the specification requirements for material or placement quality. It is still the Contractor' s responsibility to verify that any blend of reclaimed paving materials with or without virgin materials shall meet all the specification requirements.

SECTION 201 - CONCRETE, MORTAR, AND RELATED MATERIALS
201- 1 PORTLAND CEMENT CONCRETE.
201- 1. 1. 1 General.

Add the following paragraph to this subsection after the first paragraph:

Contractor shall furnish the Engineer a copy of the mix design to be used and with legible certified weight - master' s certificate for each load of PCC delivered to the Work. Portland Cement concrete delivered to the project site having a water content and/ or slump greater than that specified in the mix design shall be rejected and removed from the Work site. 201- 1. 1. 2 Concrete Specified by Class and Alternate Class.

Revise the third paragraph of the subsection to read as follows:

The concrete class, alternate class, and maximum slump for various types of construction shall be as specified in Table 201- 1. 2. 2( A) except for the concrete class specified for Street Surface Improvements. Street Surface Improvements shall have a concrete class of 560- C- 3250. 201- 1. 2. 4 Chemical Admixtures.

Revise paragraph ( b) of this subsection to read as follows:
b) Accelerating Admixtures. Calcium Chloride shall not be used as an admixture. Other accelerating admixtures shall conform to ASTM C 494, accelerating ( Type C), or water - reducing and accelerating Type E) admixtures, shall be approved by the Engineer prior to use. 201- 1.4.4 Hand Mixing.
120
06/24/2025
C10
131 of 352
Replace the first sentence with the following:
201- 1.4. 4 Hand Mixing. Hand mixing concrete shall not be allowed except by prior permission from the Engineer and, if permitted, only when the amount of concrete required is less than one cubic yard ( 1 yd. 3). Prepackaged unmixed concrete shall not be allowed except by prior permission from the Engineer.
201- 2 REINFORCEMENT FOR CONCRETE.
201- 2. 2 Steel Reinforcement.
201- 2. 2. 1 Reinforcing Steel.

Replace the first sentence with the following:
201- 2. 2. 1 Reinforcing Steel. Unless otherwise specified, reinforcing steel, except longitudinal steel, shall be Grade 60 billet steel conforming to ASTM A615. 201- 3 EXPANSION JOINT FILLER AND JOINT SEALANTS.
201- 3. 1 General.

Replace the second paragraph of this subsection with the following:

All expansion joints shall be formed with joint filler and sealed with Type " A" two- part polyurethane sealant per Subsection 201- 3. 4 (" Type " A" Sealant ( Two - Part Polyurethane Sealant"). The filler shall be placed in the correct position before concrete is placed against it. Holes or joints in the joint filler shall be filled with joint sealant to prevent the passage of mortar or concrete from one side of the joint to the other.

SECTION 203 - BITUMINOUS MATERIALS
203- 5 SLURRY SEAL.
203- 5. 4 Emulsion - Aggregate Slurry ( EAS).
203- 5. 4. 2 Materials.
203- 5. 4. 2. 2 Emulsified Asphalt.

Replace the first two sentences of the first paragraph with the following:
203- 5. 4. 2. 2 Emulsified Asphalt. Emulsified asphalt shall be quick -set CQS-1h and contain latex.

Slow -set emulsified asphalt shall not be used without prior approval from Engineer.

Add the following paragraph at the end of the subsection:

Type 1 slurry seal shall be used on residential streets and Type 2 slurry seal shall be used on residential collector streets.
121
06/24/2025
C10
132 of 352
203- 5. 4. 2. 4 Latex.

Replace the first sentence with the following.
203- 5. 4. 2.4 Latex. Prior to use the addition and exact percentage of latex to be added shall be approved by the Engineer.
203- 6 ASPHALT CONCRETE.
203- 6. 1 General.

Add the following paragraphs to this subsection:

The grading of the combined aggregates and the percentages of asphalt binder shall be as follows:

Type III asphalt concrete, which includes Alternate Rock Products - Type S from Section 400, as mentioned in Subsection 203- 10. 2. 4 (" Composition and Grading.") IS NOTACCEPTABLE.

A minimum of five ( 5) Working Days prior to the paving operation, the Contractor shall submit to the Engineer the pavement supplier' s certification of gradation and oil content of the asphalt concrete to be used for this Contract.

SECTION 212 - LANDSCAPE AND IRRIGATION MATERIALS
212- 1 LANDSCAPE MATERIALS.

Revise this subsection to read as follows:
212- 1 LANDSCAPE MATERIALS. All landscape materials shall conform to all applicable City of Vista Standard Specifications for landscaping ( see list of Appendices in Table of Contents). If not otherwise specified in the City of Vista Standard Specifications for landscaping, landscape materials shall conform to the Greenbook, the San Diego Regional Supplement to the Greenbook, and these specifications.
212- 1. 1 Topsoil.
212- 1. 1. 1 General.

Replace this subsection with the following:
122
06/24/2025
C10
133 of 352
All topsoil shall be Class " A" (" imported"), as specified herein. 212- 1. 2 Soil Fertilizing and Conditioning Materials.
212- 1. 2. 5 Mulch.

Replace this subsection with the following:

All mulch shall be Type 1( ground wood product) as specified herein. 212- 1. 5 Headers, Stakes, and Ties.
212- 1. 5. 2 Headers and Stakes.

Replace the first paragraph as follows:

Headers shall be two inch by four inch ( 2" x 4") inch composite wood ( similar to " Trex") except that two one inch by four inch ( 1" x 6") boards shall be supplied for laminations on turns and curves.

Header stock shall be supplied in lengths of at least ten feet ( 10'). Stakes for headers shall be pointed one and one- half inch by eighteen inch ( 1-1/2" x 18") long of one -quarter inch ( 1/4") thick steel and be set at three feet ( 3') on center with stakes located within one foot ( 1') of both ends of each header.

Header joint splicing shall use four inch x six inch ( 4" x 6") galvanized steel truss plates. 212- 2 IRRIGATION SYSTEM MATERIALS.

Revise this subsection to read as follows:
212- 2 IRRIGATION SYSTEM MATERIALS. All irrigation materials shall conform to all applicable City of Vista Standard Specifications for irrigation ( see list of Appendices in Table of Contents). If not otherwise specified in the City of Vista Standard Specifications for irrigation, irrigation materials shall conform to the Greenbook, the San Diego Regional Supplement to the Greenbook, and these specifications.
212- 3 ELECTRICAL MATERIALS.
212- 3. 1 General.

Add the following paragraph to this subsection:

All electrical materials used for irrigation shall conform to all applicable City of Vista Standard Specifications for electrical materials for irrigation. If not otherwise specified in the City of Vista Standard Specification for electrical irrigation systems, electrical materials used for irrigation shall conform to the Greenbook, the San Diego Regional Supplement to the Greenbook, and these specifications.
123
06/24/2025
C10
134 of 352
PART 3 - CONSTRUCTION METHODS
SECTION 300 - EARTHWORK
300- 1 CLEARING AND GRUBBING.
300- 1. 1 General.

Add the following paragraphs to this subsection:

Clearing and Grubbing shall include the protection of all items to remain, sawcutting, cold milling AC pavement, demolition of existing improvements, salvaging existing materials ( topsoil) and improvements as specified or shown on the Plans, removal of deleterious materials, and proper disposal from the Project site of all existing surface and subsurface materials as required to construct the improvement as shown on the Plans and as described in the Specifications. Typical items to be removed include, but are not limited to, trash, fences, posts, poles, gates, street signs, AC dikes, AC paving, striping ( by grinding), decorative concrete, concrete driveway entrance, concrete sidewalk, concrete curb and gutter, concrete headwall structures, retaining walls, landscape border logs, decorative walls, concrete pavers, reinforcing steel, rock, boulders and cobbles, trees, stumps and roots, shrubs, other vegetation or organic materials, soil, irrigation systems, spoils, debris, sewer pipe, storm drain pipe, storm drain inlets and grates, electrical conduits and pullboxes, wire, utility cabinets or boxes, drinking fountains, guardrails, delineators, pavement markers, and all other objectionable materials which interfere with the Work whether or not specifically indicated on the Plans or otherwise shown to be protected or relocated. Abandoned utility lines and structures not removed with Engineer' s approval shall be filled with blown sand and conduits plugged. Concrete and bituminous pavement shall be removed to neatly sawed edges. Sawcuts shall be to a minimum depth of three inches ( 3").

Clearing and grubbing shall also include the relocation, adjusting or salvaging of all facilities so indicated on the Plans which are not designated as separate bid items or which are not included in other bid items.

If there are decorative items on private lots, including decorative concrete pavers, decorative wall blocks, rocks used for landscape decoration, boulders, and custom signs, and the Contractor would prefer to salvage items for the property owners, the items shall be removed carefully and placed at a location near the disturbed area on the private property, with the property owner' s approval.

The Contractor shall remove existing irrigation systems ( including both water supply and water distribution lines, electrical supply, and electrical control elements of the system) that are within the Project limits and place these materials on the property owner' s property. Contractor shall cap ends of cut lines and wires, and mark locations with lath so that property owner can locate them later.

Miscellaneous fencing materials may be encountered during Work. The terminal post of each fence removed shall be reinforced by bracing or other appropriate means to maintain the structural integrity of the portion of fence to remain. Relocation and reconnection of existing fences as shown on the Plans shall include all posts, hardware, and all incidentals necessary to complete the Work. 124
06/24/2025
C10
135 of 352
Terminations for all fire hydrants, WARF type services and associated piping to be removed and salvaged shall be in accordance with the Vista Irrigation District ( VID) standards. The minimum requirements shall include removal of piping back to the mainline, closing the valve, and installation of a blind flange and thrust block.

All existing water services shall be relocated or extended to behind curb or behind sidewalk if contiguous to curb. The Contractor shall inspect and verify that the existing service, including the connection at the main, meets current Vista Irrigation District ( VID) standards. Where existing services meet VID standards, extension of the service will be allowed at the price bid for water meter relocations.

All existing sewer or water facilities to be abandoned within the proposed Project limits shall be terminated at the mainline in accordance with district requirements. This shall include removal of the sewer and water service back to the main. The sewer lateral shall be capped with a fitting and sealed with concrete at the wye connection. The water service shall be terminated at the corporation stop and the stop closed.

During surface clearing operations, the Contractor shall not cover or bury any plant growth or other objectionable materials on public or private property. If the Contractor cannot successfully separate the plant growth from the surface soil and advertently or inadvertently mixes organic or other objectionable materials with the soil, the soil so contaminated shall be removed from the site by the Contractor. All costs, if any, associated with removing the soil mixed with organic or other objectionable materials and importing soil to replace said contaminated soil shall be borne by the Contractor and no additional payment shall be made to the Contractor.

During grading operations, the Contractor shall provide temporary graded driveways and continuing maintenance thereof to provide safe, smooth, stable and continuous access to all residences and businesses within the Project area. All costs, if any, associated with such grading operations shall be borne by the Contractor and no additional payment shall be made to the Contractor.

Unless otherwise noted on Plans, the Contractor shall protect all existing sewer, water, electric, telephone, communication, television, fire lines, street lights, traffic signal, red light cameras, irrigation, and other utilities, services and systems, whether shown on the Plans or not. The Contractor shall maintain all services in working condition during the course of the Work. The Contractor shall remove all existing abandoned pipelines and conduits of any type or use, and pipelines and conduits of any type or use that are abandoned during the course of the Work and shall replace said pipelines and conduits with properly compacted soils. The Contractor shall immediately restore to full operation any utilities, services or systems that are disturbed during the course of the Work. 300- 1. 3. 2 Requirements.

Revise paragraph a) to read as follows:
a) Bituminous Pavement. Bituminous pavement shall be removed to clean, straight lines.

Sawcutting of edges to be joined is required, unless the entire pavement section is removed by cold milling. Where only the surface of existing bituminous pavement is to be removed, the method of removal shall be cold milling or other method approved by the Engineer, and a minimum laying 125
06/24/2025
C10
136 of 352
depth of one and one- half inches ( 1- 1/ 2") of new pavement material shall be provided at the edge of new pavement. Where new bituminous pavement adjoins existing pavement, either at a trench or a section where pavement has been removed or is being widened, the edges where new pavement meets existing pavement shall be trimmed to neat straight lines and cold milled a minimum of one and one- half inches ( 1- 1/ 2") deep for a minimum of six inches ( 6") wide from the edge before paving or resurfacing, to ensure that all surfaces being paved or resurfaced are accessible to the rollers used to compact the subgrade or paving materials, and to provide an overlay key at the join line.

Revise the first two sentences of paragraph b) to read as follows:
b) Concrete Pavement. Concrete pavement shall be removed to neatly sawed edges. Sawcuts shall be made to a minimum depth of three inches ( 3").

Revise the first sentence of paragraph c) to read as follows:
c) Concrete Curb, Walk, Gutters, Driveways, and Alley Intersections. Concrete shall be removed to neatly sawed edges with saw cuts made to a minimum depth of three inches ( 3").

Revise the last sentence of paragraph c) to read as follows:

Curb and gutter shall be sawed to a minimum depth of three inches ( 3"), or otherwise as required to prevent damage to the adjacent concrete to remain, on a neat line at right angles to the curb face. 300- 1. 4 Payment.

Revise this subsection to read as follows:
300- 1.4 Payment. The BID SCHEDULE DOES NOT include a bid item for Clearing and Grubbing.

Full compensation for any necessary Clearing and Grubbing required to perform the construction operations specified or shown on the Plans will be considered as included in the price bid for the related items of work, and no additional compensation will be allowed therefore. Payment for removal and disposal of abandoned utilities shall be included in the various items of work and no additional compensation will be allowed therefore.
300- 2 UNCLASSIFIED EXCAVATION.
300- 2. 1 General.

Revise this subsection to read as follows:
300- 2. 1 General. Unclassified excavation shall consist of all excavation, including roadway excavation, removal and stockpiling of suitable material, mixing and moisture conditioning of dry material, mixing and drying of wet material by various methods, disposal of unsuitable materials 126
06/24/2025
C10
137 of 352
including cobbles, rocks and boulders), salvage and stockpile of existing topsoil for use on the Project, and all other required earthwork operations to bring all areas that are within the grading and excavation limits on both public and private property to the required subgrade elevations and cross sections as shown on the Plans and as required in the Project' s geotechnical investigation. Suitable excavated material may be used onsite to make all fills shown on the Plans. Unclassified excavation shall also include pumping and disposal of storm water and groundwater. Any tree roots or other deleterious material uncovered during excavation shall be completely removed and cut back so that new improvements will not be affected by future root growth.

In the event weather conditions make drying by aeration or other processes impractical as determined by the engineer, he may suspend the Work. However, the Contractor shall continuously provide for traffic and access requirements during the suspension period in conformance with these Technical Provisions. The Work shall be suspended as provided for in Section 6 (" PROSECUTION, PROGRESS, AND ACCEPTANCE OF THE WORK.") of the Standard Specifications except the suspension shall not be deemed to be suspension by the Agency for its own convenience or benefit.

Stockpiling of material and storage of equipment or supplies associated with excavation and/ or soil aeration activities within existing or proposed wetland, willow woodland or riparian areas is strictly prohibited.

The excavation, placement, conditioning, and compaction of material shall be in accordance with the Plans, Specifications, the City of Vista Development Code ( Chapter 17 Section 17. 56), and the Geotechnical Report, prepared by Terra Costa Consulting Group, Inc. The Geotechnical Report is available for viewing at the City of Vista Engineering Department. 300- 2. 2 Unsuitable Material.
300- 2. 2. 1 General.

Revise this subsection to read as follows:
300- 2. 2.1 General. All excess material generated by the grading operations that is not suitable for backfill shall be excavated and disposed of by the Contractor at a legal disposal site. The Agency makes no claim on the suitability or moisture content of the existing materials. Any suitable local borrow materials at the site that the Contractor wishes to re -use shall be stockpiled by the Contractor.

The location of stockpiles shall be approved by the Engineer prior to placement of materials, and all stockpiles shall be protected by erosion control measures.

All subgrade areas to receive fills or structures shall be inspected by the Geotechnical Engineer.

All alluvial and colluvial soils, loose or poorly compacted soils, or existing dry material must be reworked before the placement of base or concrete can proceed. Areas where soils are loose or poorly compacted shall be reworked by excavating, blending and recompactingthe loose soils to the specified compaction. The existing loose soils to be reworked shall be removed by the Contractor until a firm unyielding surface is exposed or to a depth determined by the Engineer. Dry materials shall be scarified and moisture conditioned to achieve the specified compaction. With the approval of the Geotechnical Engineer, the Contractor may choose to stabilize poorly -compacted areas with geogrid at his own expense.
127
06/24/2025
C10
138 of 352
If the Contractor wishes to temporarily stockpile material for disposal at a later date in any area other than the project area or construction staging area, the Contractor shall locate a suitable space which is outside the Public Right -of -Way and suitable to the Agency. The location of stockpiles shall be approved by the Engineer prior to placement of materials, and all stockpiles shall be protected by storm water pollution prevention and erosion control measures. The stockpiles shall be removed regularly from the Project site so as not to interfere with access to the Project.

If the excavated material is unsatisfactory as excavated for other uses in the Project, as determined by the Engineer, the Contractor shall remove and dispose of such excavated material off the site. The Contractor shall be responsible for obtaining a suitable legal disposal site for any unsuitable excavated materials in accordance with the appropriate section in the Standard Specifications.
300- 2. 2. 2 Wet Material.

Revise this subsection to read as follows:
300- 2. 2. 2 Wet Material. If required excavated material is unsatisfactory for the specified use on the Project solely because the material has a moisture content of four percent ( 4%) or more above the optimum moisture content, the Contractor shall process the material to reduce the moisture content to an optimum condition, or remove the material and replace it with suitable material. The material may be processed by blending the wet soil with soils having a lower moisture content and / or spreading the excavated material in a manner that enables the material to dry to optimum moisture content. With the approval of the Geotechnical Engineer, the Contractor may choose to stabilize unstable subgrade areas with geogrid at his own expense. 300- 2. 7 Selected Material.

Revise this subsection to read as follows:
300- 2. 7 Selected Material. Selected material encountered in excavation within the right- of-way shall be used as directed by the Engineer. Topsoil excavated within the limits of the Project may be considered as a selected material only for the purpose of backfilling areas to be planted. 300- 2. 8 Measurement.

Add the following paragraph to this subsection:

The Plans and the Specifications show work to be done which requires earthwork, both cut and fill, to establish the lines and grades shown on the Plans. The Agency has endeavored to establish reasonable accurate earthwork quantities of the work actually involved and these quantities represent the results of actual survey measurements and data and calculated adjustments for changes proposed on the Plans, however, due to the approximate nature of such data and therefore the difficulty of making accurate measurements of earthwork quantities for this type of project, the estimated quantities for grading will be assumed to be the actual quantity. The Contractor shall review 128
06/24/2025
C10
139 of 352
the site and make his own estimate of the Work required to complete the Project. No modifications shall be made to the quantity shown on the Plans and in the Specifications, unless additional quantities of grading are ordered by the Engineer.
300- 2. 9 Payment.

Revise this subsection to read as follows:
300- 2. 9 Payment. The BID SCHEDULE for this Project DOES NOT include a bid item for Unclassified Excavation. Full compensation for all necessary Unclassified Excavation required to perform the construction operations specified or shown on the Plans will be considered as included in the price bid for the related items of work, and no additional compensation will be allowed therefore.

The excavation, stockpiling, and placement of topsoil and suitable local borrow material will be included in Unclassified Excavation. Removing such material from the stockpile and placing it in its final position is also included in Unclassified Excavation. The Contractor may stockpile suitable local borrow material or import suitable borrow material; however, no separate payment will be made for excavating material from an optional stockpile or importing suitable borrow material and placing the material in its final position.

The removal and disposal of unsuitable material, and the over -excavating and reworking of material that can be made suitable, including groundwater removal by various drying procedures or other remedial geotechnical ( soil) treatment shall be included in Unclassified Excavation and no additional compensation will be allowed.

The over -excavation and processing or removal and disposal of wet materials shall be included in Unclassified Excavation and no additional compensation will be allowed.

No separate payment will be made for excavating topsoil temporarily stockpiled and placing in its final location on the slope and other areas to be planted for erosion control planting or landscaping, whether or not required by the Contract Documents or by the Engineer. 300- 3 STRUCTURE EXCAVATION AND BACKFILL.
300- 3. 1 General.

Add the following paragraphs to this subsection:

In accordance with the provisions of Section 20676 of the State of California Public Contract Code, it shall be mandatory upon the Contractor to whom the Contract is awarded, and upon all subcontractors and suppliers under him, to obtain all construction aggregate, sand, gravel, crushed stone, road base, fill materials, and any other mineral materials used for Structure Backfill, from a supplier that is included on the most current Office of Mine Reclamation AB 3098 List ( per California Assembly Bill 3098). Failure to identify the supplier and the mine may result in rejection of the submittal, and any work completed using materials from an unlisted mine will be SUBJECT TO REJECTION.
129
06/24/2025
C10
140 of 352
The excavation, placement, conditioning, and compaction of material shall be in accordance with the Plans, Specifications, the City of Vista Development Code ( Chapter 17 Section 17. 56), and the Geotechnical Report, prepared by Terra Costa Consulting Group, Inc. on file and available for viewing at the City of Vista Engineering Department.

The Contractor shall excavate to the lines and grades required, whether or not specifically shown on the Plans. The Contractor shall provide and remove all shoring, sheeting, bracing, cribbing, pumping, lagging, piling, tiebacks, soil anchors, shields, temporary retaining structures, planking, or other types of support for the walls of all open excavations required. The Contractor shall excavate and maintain the bottom of all trenches and excavations in a condition that is level, firm, clean and free from all debris or foreign matter. Excavations shall be kept free from water at all times. The Contractor shall remove any unsuitable material encountered below grade as directed bythe Engineer. 300- 3. 6 Payment.

Add the following paragraphs to this subsection:

Compensation for dewatering shall be considered as included in the lump sum price bid paid for Dewatering Measures or included as an incidental item to excavation and backfill or other items of work in the BID SCHEDULE and no additional compensation will be allowed therefore. Full compensation for any necessary work related to Unsuitable Materials required to perform the construction operations specified or shown on the Plans will be considered as included in the price bid for the related items of work, and no additional compensation will be allowed therefore.

Full compensation for supporting the excavation for structures shall include furnishing all labor, materials, tools, equipment, and incidentals and for doing all the work involved in providing excavation safety, shoring or sloping of excavations including, but not limited to, design of the shoring system; obtaining all necessary permits from the Division of Occupational Safety and Health; constructing shoring; and removal and disposal of the shoring materials; all as shown on the Plans, or as specified in the General Conditions, Standard Specifications, and these Supplementary Special Provisions; shall be considered as included in the related items of work and no additional compensation will be allowed.

No change will be made in the amount to be paid for supporting the excavation for structures as a result of required revisions in the excavation support details due to a type of soil encountered which requires a method of trench support different from that approved. 300- 4 UNCLASSIFIED FILL.
300- 4. 1 General.

Add the following paragraphs to this subsection:

The excavation, placement, conditioning, and compaction of material shall be in accordance with the Plans, Specifications, the City of Vista Development Code ( Chapter 17 Section 17. 56), and the Geotechnical Report, prepared by [ INSERT NAME OF CONSULTING GEOTECHNICAL FIRM, TITLE AND DATE OF GEOTECHNICAL REPORT AND ANY AMENDMENTS HERE]. The Geotechnical Report is INSERT THE DISPOSITION OF THE PROJECT'S GEOTECHNICAL REPORT HERE (e.g. " attached to these Project Specifications in its Appendices ( see list of Appendices in Table of Contents on Page 2)" or " on 130
06/24/2025
C10
141 of 352
the City of Vista FTP site" or " on file and available for viewing at the City of Vista Engineering Department" or " is not available for this Project")].

Any objectionable material, including organic and inorganic debris, shall be removed, and shall not be placed in the fill.

The Contractor shall establish rough grade of the areas to be planted by placing fill material to a minimum of six inches ( 6") below the finished grade shown on the Plans. The Contractor shall then complete the grading work to establish finished grade by placing a minimum of six inches ( 6") of topsoil that has been stockpiled from the existing site or imported.

Excess soil remaining from excavations on the Project site may only be used for fill material when rocks, lumps, cobbles, clods, base material, or other solid materials such as broken concrete or asphalt from removal operations are suitable for the particular area to be filled as determined by the Engineer and conform to the requirements of the geotechnical investigation. Broken concrete or asphalt pavement materials shall not be allowed within site grading fill areas or roadway fills less than three feet ( 3') in height, within three feet ( 3') of final grade in any area or within five feet ( 5') ( vertically) of the existing ground water table. Any concrete or asphalt placement shall be approved by the Geotechnical Engineer.

Concrete or asphalt pieces shall be less than six inches ( 6") in maximum dimension and surrounded by soil particles when used as compacted fill. No nesting shall occur. If the Contractor wishes to use any of the excess material remaining from the Project excavations for any purpose, the material must be suitable for use as fill or backfill and meet the requirements of Subsection 300- 4 (" UNCLASSIFIED FILL.") of the Standard Specifications and the geotechnical investigation for this Project. The Contractor shall first remove all organic material, construction debris, miscellaneous debris, rubbish, and other objectionable materials contained therein, then obtain tests of the material [( acceptable to the Geotechnical Engineering Laboratory) - NAME TYPE OFTEST, ETC. FOR PROJECTASAPPROPRIATE] to confirm its suitability.

Geotechnical ( soil) testing of all fill materials; subgrade, subbase, and base will be conducted by the Agency and the Geotechnical Engineer. Geotechnical ( soil) tests may include relative compaction tests, sand equivalent tests, sieve analysis, R-values, etc. The results shall be presented directly by the laboratory to the Engineer. No base or PCC pavement shall be placed prior to the subgrade or subbase being compacted, tested and approved by the Engineer.

The cost of any initial geotechnical ( soil) tests shall be borne by the Agency. Additional geotechnical ( soil) tests due to the failure of one ( 1) or more of the initial tests shall be conducted by the laboratory and any costs borne by the Contractor. The Contractor shall make allowances in his construction procedure to permit testing of the Work in progress by the Engineer, and no additional compensation shall be paid to the Contractor for delays due to testing.

Add the following new subsection:
300- 12 EROSION CONTROL.
300- 12. 1 General.
131
06/24/2025
C10
142 of 352
300- 12. 1 General. The Contractor shall provide erosion control and water pollution control conforming to the requirements shown on the Plans, as specified herein, and as elsewhere required by the Contract Documents. Erosion control and water pollution control shall include the Work specified herein, and such additional measures, as may be directed by the Engineer, to meet Best Management Practices, as defined herein, and to properly control erosion and storm water damage of the limits of work and construction impacts upon areas receiving drainage flows from within the limits of work.

The work covers the prevention, control and abatement of waterborne silts, sediments, earth materials, inorganics, chemicals, construction materials, trash, and debris in order that pollution of the existing onsite and downstream watercourses is prevented or minimized. The Work includes preventing, controlling or abating water polluting elements or materials which may result both directly and indirectly from within and outside the Project work limits. This includes water flow from, to, or through the site resulting from rainfall runoff, groundwater movement, and stream storm water discharge.

The work includes:
a] the exercise of care and the execution of every reasonable precaution by the Contractor as required by the conditions of the site, weather and construction activities involved; b] the implementation of construction of various devices, facilities, or features shown on the Plans; c] the implementation or construction of any devices, facilities, or programs as required conditions of any regulatory agency permits for the Project. The Work therefore includes, but is not limited to, the construction and / or installation of temporary devices such as hay ( straw) bales; silt fences; gravel bags; erosion control netting, fabric, blankets, or mats; silt or sediment basins; dikes or berms; swales, linings; ponds; diversion structures, pipes, and related facilities. d] the cleaning, repairing, silt and sediment removal, maintenance and the removal of devices.

Note: The Contractor' s attention is also directed to the specific requirements contained within the regulatory agency conditional agreements.

Unless other more restrictive requirements are specified elsewhere in the General Conditions or these Special Provisions, or as a requirement of regulatory or other Agency permits, the following minimum provisions shall be met:
a] Equipment and workers for emergency work shall be made available at all times during the rainy season. All necessary materials shall be stockpiled on site at convenient locations to facilitate rapid construction or deployment of temporary devices when rain is imminent. b] Devices shown on the Plans shall not be moved or modified without the approval of the Engineer. c] The Contractor shall restore all erosion control devices to working order to the satisfaction of the Engineer after each runoff -producing rainfall, and every 24 hours during a prolonged storm event, as needed.
d] The Contractor shall install additional erosion control measures as may be required by the Engineer due to uncompleted grading operations or unforeseen circumstances which may arise. 132
06/24/2025
C10
143 of 352
e] The Contractor shall be responsible and shall take necessary precautions to prevent public trespass onto areas when impounded waters create a hazardous condition. f] Duringthe rainy season and when rainfall is probable, graded areas around the Project perimeter must drain away from the face of slope at the conclusion of each working day. g] All removable protective devices shown shall be in place at the end of each working day when the five ( 5) calendar day rain probability forecast exceeds thirty percent ( 30%).

Compliance with the requirements of this subsection shall in no way relieve the Contractor from his responsibility to comply with the other provisions of the contract, in particular his responsibility for damage and for preservation or property.

Failure to take said measures satisfactory to the Engineer or regulatory agencies will subject Contractor to orders to cease operations. Any losses to Contractor associated therewith shall be at Contractor' s sole expense.
300- 12. 2 Grading Controls.
300- 12.2 Grading Controls. The Contractor shall protect all areas that have been graded and/ or cleared and grubbed as well as areas that have not been graded and/ or cleared and grubbed within the limits of work from erosion. The Contractor shall provide temporary earth berm, fiber rolls, gravel bags, silt fences, stabilized construction entrances and similar measures, coordinated with its construction procedures, as necessary and as shown on the Plans to control on site and off site erosion during the construction period. The Contractor shall protect areas which have been cleared and grubbed prior to excavation or embankment operations, and which are subject to runoff during the duration of the contract. The criteria used to determine the appropriate erosion control measures shall be the " Best Management Practices", hereinafter BMP, defined and described in the latest edition of the " California Storm Water Best Management - Construction Handbook" as published by the Storm Water Quality Task Force [ go to the CASQA on- line bookstore at the following URL to purchase, download or view handbook( s)]:
http:// www. cabmphandbooks. com
The Contractor shall maintain a copy of the latest edition of the " California Storm Water Best Management - Construction Handbook" on the Project site and shall conduct its operations in conformity to said Handbook.

Excavation and Embankment areas, while being brought to grade and during periods of completion prior to final surface construction, shall be protected from erosion and the resulting siltation of downstream facilities and adjacent areas, and be graded so as to direct runoff into impoundment areas within the limits of work where such runoff shall have pollutants removed by BMP methods. The Contractor shall provide protection by BMP measures to eliminate erosion and the siltation of downstream facilities and adjacent areas. These measures shall include all means necessary to prevent polluted runoff from leaving the site.
300- 12. 4 Payment.
133
06/24/2025
C10
144 of 352
300- 12. 4 Payment. Payment for all work required to provide Storm Water Pollution Prevention and Erosion Control shall be included in the lump sum price included in the Bid specified as Storm Water Pollution Prevention and Erosion Control. Such price shall include full compensation for preparing the Storm Water Management Permit, the Storm Water Pollution Prevention Plan ( SWPPP) where applicable, performing erosion control and water pollution control, conforming to the operational requirements herein, providingand maintaining all BMPs, removingall construction BMPs, conforming to the requirements of the current State Water Resources Control Board of California Order, and the current City of Carlsbad Grading Ordinance, and no additional compensation will be allowed therefore.

SECTION 301 - TREATED SOIL, SUBGRADE

PREPARATION AND PLACEMENT OF BASE MATERIALS
301- 1 SUBGRADE PREPARATION.
301- 1. 1 General.

Revise this subsection to read as follows:
301- 1. 1 General. This subgrade preparation specification shall govern the preparation of natural, filled, or excavated material prior to the final placement of subbase or base material, geotextile fabric, drainage facilities, pavement, curbs and gutters, driveways, sidewalks, retaining walls or any concrete facilities or roadway structures. Subgrade preparation shall include, but not be limited to scarification and moisture adjustment and compaction of the top twelve inches ( 12") of the subgrade in the pavement areas to ninety- five percent ( 95%) relative compaction, and attendant work, export of remaining excess material to a disposal site or spoil area acquired by the Contractor and pumping and disposal of storm and ground water. In areas where existing utilities may interfere with subgrade preparation work in the roadway prism, the Contractor may choose to place geogrid to stabilize the subgrade and reduce the depth of excavation.

Geotechnical ( soil) testing of all fill materials; subgrade, subbase, and base will be conducted by the Agency and the Geotechnical Engineer. Geotechnical ( soil) tests may include relative compaction tests, sand equivalent tests, sieve analysis, R-values, etc. The results shall be presented directly by the laboratory to the Engineer. No base or PCC pavement shall be placed prior to the subgrade or subbase being compacted, tested and approved by the Engineer.

The cost of any initial geotechnical ( soil) tests shall be borne by the Agency. Additional geotechnical ( soil) tests due to the failure of one ( 1) or more of the initial tests shall be conducted by the laboratory and any expenses borne by the Contractor. The Contractor shall make allowances in his construction procedure to permit testing of the Work in progress by the Engineer, authorized representative or the Inspector, and no additional compensation shall be paid to the Contractor for delays due to testing.
301- 1. 6 Adjustment of Manhole Frame and Cover Sets to Grade. 134
06/24/2025
C10
145 of 352
Revise the first paragraph of this subsection to read:

Utility valve, manhole, and vault frames and covers within an area to be paved or graded will be set by the owners thereof to finished grade. The Contractor shall adjust all storm drain manholes, sewer cleanouts and manholes, water valve sleeves and covers not adjusted by the owner, survey monument covers and other miscellaneous facilities requiring adjustment to the finished grade, unless the adjustment is designated as " By Others", in accordance with the Contract Documents. Existing manholes shall be ramped with a minimum of ten feet ( 10') round with temporary asphalt. Temporary asphalt ramps shall be completely removed prior to asphalt overlay. The area around each manhole must be compacted prior to paving. Contractor shall be responsible to provide all riser rings, grade rings, slip cans and/ or sleeves needed for adjustments. The Contractor shall coordinate with the various utility companies to ensure that the utility companies complete their adjustment work prior to the completion of the Work. Manholes in asphalt concrete pavement shall be set to finish grade in accordance with provisions of 302- 5. 8. In the case of Portland cement concrete pavement, manhole frames shall be set to finish grade before paving. Repaving required as a result of reconstructing or adjusting all manhole and vault frames and covers to grade shall be the responsibility of the Contractor and the cost thereof shall be included in the bid item for pavement.

Revise the second paragraph of this subsection to read:

The Contractor shall exercise care so that surface materials such as rocks, dirt, and debris do not enter sewer lines, manholes, valve and cleanout sleeves, and other utility facilities. In order to prevent contamination, Contractor shall provide a three- quarter inch ( 3/ 4") thick plywood platform to be placed on the concrete shelf at the bottom of sewer manholes prior to starting adjustment work. The shape of this platform shall conform to the circumference of the inside wall at the shelf elevation. After the manhole had been adjusted, the material accumulated on the plywood shelf along with the plywood shelf shall be removed from the manhole and disposed of in accordance with Subsection 300- 1. 3 Removal and Disposal of Materials.") The Contractor shall remove all debris from the interior of manholes, valve covers, and cleanouts and shall clean all foreign material from the top of the frames and covers. The Contractor shall include all costs in the related items of work, and no additional compensation will be allowed.

Add the following new paragraph( s) to this subsection:

Sewer and storm drain manholes belonging to all local public agencies shall be adjusted or reconstructed in accordance with the Vista Sewer System Design Standard Specifications, which are included in the appendices of these Specifications. Manholes on this project are or thirty- six inch ( 36") two- piece covers. For manholes that are in good condition, the Contractor shall adjust the manhole to grade using new precast concrete riser rings. If any manhole is defective to the extent that it requires fifteen inches or more ( 15+") of pre -cast concrete riser rings to adjust the cover to grade, the Contractor shall reconstruct the manhole as described in the Specifications. The Contractor shall protect the manhole covers from Prime Coat or Asphalt Concrete, or clean them if they are not protected properly.
135
06/24/2025
C10
146 of 352
301- 1. 7 Payment.

Revise this subsection to read as follows:
301- 1.7 Payment. The BID SCHEDULE DOES NOT include a bid item for subgrade preparation.

Full compensation for Subgrade Preparation required to perform the construction operations specified or shown on the Plans will be considered as included in the price bid for the related items of work, and no additional compensation will be allowed therefore.

Payment for grading operations in areas designated as " grade only" will be considered as included in the price for excavation or fill.

Payment for adjusting manhole frames and covers to grade, where the difference between the lowest point of manhole riser removal to the final elevation of the top of the frame is less than 15 inches or where the adjustment is accomplished by adjustment rings only, will be made at the Contract unit price for adjusting each manhole frame or cover, using either cast- iron riser rings or pre -cast concrete grade rings.

Payment for adjusting manhole frames and covers to grade, where the difference between the lowest point of manhole riser removal to the final elevation of the top of the frame is 15 inches or more, will be made at the Contract unit price for reconstructing each manhole frame or cover.

If no payment provision for manhole or vault adjustment or reconstruction is made, payment for such work will be considered included in the related items of work, and no additional compensation will be allowed.
301- 2. 3 Compacting.

Add the following as the first paragraph:
301- 2. 3 Compacting. It shall be the Contractor' s responsibility to provide adequate equipment and methods to accomplish the Work in accordance with these Specifications. The grading shall be done to the elevations provided in the Plans. Any field conditions that prevent the Contractor from matching design elevations shall be immediately notified to the Engineer.

Revise the third paragraph of this subsection to read as follows:

The relative compaction of each layer of compacted base material shall not be less than ninety- five percent ( 95%) for curbs, driveways and pavement for a minimum depth of one foot ( 1.0') below the grading plane. Compaction under sidewalks and in the excepted areas shall be as specified in Subsection 211- 1 (" Compaction Tests.") with each layer of compacted base material having a minimum compaction of ninety percent ( 90%).
301- 2. 4 Measurement and Payment.
136
06/24/2025
C10
147 of 352
Revise this subsection to read as follows:
301- 2. 4 Measurement and Payment. The quantities of new untreated aggregate base will be calculated using the square footage of the improvements constructed on the base, multiplied by the thickness of the base shown on the plans or specified. If the Engineer directs the Contractor to place additional base, the thickness requested by the Engineer will be used in calculating the pay quantity.

If the base thickness is increased by the Contractor for his convenience or to avoid performing additional required subgrade preparation, the additional base will not be included in the pay quantity.

Because the determination of whether untreated aggregate base will be needed in certain areas depends on the condition of the existing materials, it is a rough estimate for bidding purposes.

Subsequently, this bid item is exempt from the adjustment of bid unit prices under Subsection 3- 2. 2. 3 Decreases of More than 25 Percent.").

To confirm the pay quantities, the Contractor shall furnish to the Engineer at the time of delivery of the material to the job site a legible copy of a licensed weigh master' s certificate showing gross, tare, and net weights of each truckload of untreated base. Failure of the Contractor to provide a certificate to the Engineer by the end of the day on which the material represented by such certificate is delivered to the job site may, at the discretion of the Engineer, result in the forfeiture of all payment for such material, including any labor and equipment costs or related costs included in the price for furnishing and placing the untreated base.

Payment for untreated compacted aggregate base will be made by Bid Price per [ TON / CUBIC YARD] as shown in the bid.[ NOTE TO SPEC WRITER - IF THE EXISTING BASE CAN BE RE - USED THEN THE MEASUREMENT WILL HAVE TO BE A THEORETICAL CALCULATION] Such bid price shall include full compensation for clearing and grubbing; earthwork; subgrade preparation; supplying, placing, spreading, compacting, and finishing the untreated base; and all other work required to perform the construction operations specified or shown on the Plans, and no additional compensation will be allowed therefore.

SECTION 302 - ROADWAY SURFACING
302- 1 COLD MILLING OF EXISTING PAVEMENT.
302- 1. 1 General.

Add the following paragraphs:

For resurfacing, the existing asphalt concrete pavement shall be cold milled for pavement removal, header cuts and edge cuts, as detailed on the Plans and in the City of Vista Carlsbad Cold Milling Details. The Contractor shall cold mill pavement adjacent to all concrete gutters, median curbs, AC Berms, across intersecting side streets, and at the project limits. The cold milled area for edge cuts and header cuts on low - volume side streets will be at the width shown on the Plans, or a minimum of five feet ( 5') wide, and tapered from the one and one- half inches ( 1- 1/ 2") minimum depth to a depth of zero inches ( 0"). Header cuts for high - volume side streets and across the main street will be a 137
06/24/2025
C10
148 of 352
minimum of ten feet ( 10') wide, tapered from one and one- half inches ( 1- 1/ 2") minimum depth to zero inch ( 0") depth.

The Contractor shall cold mill around drain grates in the street, to maintain positive drainage toward the drainage structure after new asphalt concrete is placed. Prior to cold milling, the Contractor shall provide covers over all existing storm drain grates and inlets to prevent entry of debris.

The pavement removal thicknesses and resurfacing thicknesses may exceed the thickness of the existing asphalt concrete pavement. The contractor shall remove asphalt concrete, base, subbase, and subgrade materials to the specified depth, using cold milling or other removal methods. The Contractor shall be prepared to perform the required cold milling, removals, subgrade preparation, and compaction work before pavement is replaced, whether the existing asphalt concrete pavement section is thicker or thinner than the specified asphalt concrete pavement section.

Contractor shall furnish one or more cold milling machines operated by experienced workmen.

The surface produced shall have a tolerance so that a ten -foot ( 10') straight edge laid laterally will indicate variance of less than three - sixteenth of an inch ( 3/ 16"). Removal shall consist of: ( 1) planning and cutting the pavement to form a keyway header cut; and ( 2) removing the loosened material.

Loosened material shall be stored on the property of the Contractor and shall be disposed of off -site at the end of each workday.

Directly following the cold milling operation, all asphalt pavement joints within travel lanes that have vertical separation of more than one- half inch ( 1/ 2") shall be ramped with temporary asphalt concrete. Tamps shall be no less than ten feet ( 10') in length from the joint and shall extend across all travel lanes. Temporary asphalt ramps shall be completely removed and disposed of the job site prior to overlay application.

After cold milling and at least twenty-four ( 24) hours prior to overlay, all cracks shall be sealed in accordance with Subsection 302- 1. 7. 1(" Crack Sealing."). 302- 1. 8 Disposal of Millings.

Add the following paragraph:

Prior to acceptance of the work, the Contractor shall sweep and/ or remove all loose material created by the work from streets, gutters, curbs, medians, parkways, sidewalks, intersecting streets, adjacent lots, and driveways.
302- 1. 9 Traffic Signal Loop Detectors.

Add the following after the last sentence:

The Contractor shall notify the Engineer a minimum of three ( 3) Working Days prior to the start of cold milling asphalt concrete pavement on any street containing traffic signal loop detectors. 138
06/24/2025
C10
149 of 352
302- 5 ASPHALT CONCRETE PAVEMENT.
302- 5. 1 General.

Revise the first paragraph of this subsection to read as follows:
302- 5. 1 General. Asphalt concrete pavement shall consist of two ( 2) or more courses of a mixture of paving asphalt and graded aggregate as specified in Subsection 203- 6 (" Asphalt Concrete."), placed on a prepared surface of existing or new untreated base, or over existing paving, as necessary to construct the roadway as shown on the Plans or as required to complete the Work ( i.e. where new curb is placed, utility cuts, and manhole reconstruction area). The courses shall be of the type of mixture specified. The thickness of asphalt concrete pavement for initial patch areas next to gutters, spandrels, and curbs shall be a minimum of six inches ( 6"), and the thickness in trenches next to curbs and driveways and in trenches shall be one - inch ( 1") thicker than the existing pavement. The initial asphalt concrete patch base course for the items of work shown on the Plans shall be placed full depth from the aggregate base to the existing pavement surface as soon as the adjacent improvements are cured sufficiently to allow the paving to proceed. The initial asphalt concrete patch shall be placed in multiple move -ins to accommodate the required traffic control and staging phases, and to ensure that traffic is allowed to use the improvements as quickly as possible. Asphalt concrete in streets and parking lot areas where there is no base shall be placed on a prepared section of subgrade material to the thickness shown on the Plans. The surface course of asphalt concrete shall be a minimum of one and one- half inches ( 1- 1/ 2") thick with a one inch ( 1") minimum thickness at the overlay key. The surface course shall be placed in the minimum number of move -ins necessary to accommodate the required traffic control and staging phases, but minimize the joints in the new asphalt concrete surface. Before the surface course is placed, the edges of existing pavement shall be cold milled to form an overlay key as shown on the Plans or as specified.

In a parking lot, the entire accessible parking stall and loading area shall not exceed two percent

2. 00%) in any direction, NO EXCEPTIONS.

Add the following paragraph to read as follows:

Temporary asphalt concrete pavement and striping may be required to implement the traffic control and construction phasing shown on the Plans or specified. In sidewalk areas temporary AC surfacing shall be at least one inch ( 1") thick. In the streets, a greater thickness may be required.

Temporary surfacing and striping shall be placed before the end of the work period so traffic can be restored at the time of day specified, and it shall remain in place or be replaced regularly until the area is ready for permanent pavement and striping. Full compensation for all work required to install, maintain, and dispose of temporary asphalt concrete pavement and striping will be considered as included in the price bid for Traffic Control and Construction Phasing and no additional compensation will be allowed therefore.
302- 5. 4 Tack Coat.

Replace the first sentence of the first paragraph with the following. 139
06/24/2025
C10
150 of 352
302- 5. 4 Tack Coat. If the asphalt concrete pavement is being constructed directly upon an existing hard -surfaced pavement, a Tack Coat of PG 64- 10 paving asphalt shall be uniformly applied at a rate no less than 0. 07 gallons per square yard ( g/ sq. yd.) upon the existing pavement preceding the placement of asphalt concrete. Payment for this item shall be included in the unit price for the related asphalt concrete pavement or overlay and no additional compensation will be allowed.

Replace the third paragraph with the following:

If the asphalt concrete pavement is being constructed directly upon an existing hard -surfaced pavement, a Tack Coat of PG 64- 10 paving asphalt shall be uniformly applied at a rate no less than

0. 07 gallons per square yard ( g/ sq. yd.) upon the existing pavement preceding the placement of asphalt concrete. Payment for this item shall be included in the unit price for related asphalt concrete pavement or overlay and no additional compensation will be allowed. 302- 5. 5 Distribution and Spreading.

Add the following paragraphs:

In addition to the requirements in Subsection 302- 5. 5 (" Distribution and Spreading.") of the Standard Specifications, asphalt paving equipment shall be equipped with automatic screed controls and a sensing device or devices. When placing asphalt concrete, the automatic controls shall control the longitudinal grade and transverse slope of the screed. Grade and slope references shall be furnished, installed, and maintained by the Contractor.

At locations where new asphalt concrete pavement joins an unimproved shoulder, the Contractor shall taper the new asphalt edge by raking out all aggregate three - eighths inch or larger ( 3/ 8+") and feathering the new paving to forma smooth transition to join the unimproved shoulder. The transition shall extend a minimum of eighteen inches ( 18") onto the shoulder. Additional tack coat shall be applied to all tapered transitions to prevent raveling of the new pavement. Tapers shall be raked, rolled, and compacted so there is no lip exceeding one -quarter inch ( 1/ 4").

Should the methods and equipment furnished by the Contractor fail to produce a layer of asphalt concrete conforming to the requirements, including straightedge tolerance, of Subsection 302- 5. 6. 2 Density and Smoothness.") of the Standard Specifications, the paving operations shall be discontinued and the Contractor shall modify their equipment or furnish substitute equipment.

Careful attention shall be given to maintaining proposed surface drainage conditions during placement of asphalt overlay. Unless otherwise directed by the Engineer, existing drainage patterns shall be maintained.

Should the automatic screed controls fail to operate properly during any work period, the Contractor may use manual control of the spreading equipment for the remainder of the work period; however, the equipment shall be corrected or replaced with alternative automatically controlled equipment conforming to the requirements in this Subsection before starting another work period.

Prior to placing asphalt concrete, the Contractor shall provide covers over all existing storm drain grates and inlets to prevent entry of debris.
140
06/24/2025
C10
151 of 352
The streets identified for overlay may have rutting, offset crowns, high spots, or low spots that need to be corrected to re-establish the proper street grade. Cold milling shall be used to remove high spots.

Tack coat and leveling courses of asphalt concrete shall be placed to fill low spots and ruts and to re- establish street grades prior to the placement of asphalt concrete overlay. The Contractor shall use cold milling to remove high spots and to provide joints for AC leveling course, in areas as directed by the Engineer. The Contractor shall place tack coat in the areas delineated by the Engineer, and rake the edges of the variable thickness AC leveling course to create smooth feathering. If a quantity of AC leveling course is included in the Bid Schedule, it is a rough estimate for bidding purposes.

Subsequently, these bid items are exempt from the adjustment of bid unit prices under Subsection 3-

2. 2. 3 (" Decreases of More than 25 Percent."). If Leveling Course is needed, that work shall be directed by the Engineer in the field. The Contractor shall cooperate with the Engineer in placing the leveling course as required to re-establish street grades, and perform the work as directed by the Engineer. 302- 5. 6 Rolling.
302- 5. 6. 2 Density and Smoothness.

Add the following paragraphs to this subsection:

Contractor shall have a ten foot ( 10') straightedge onsite at all times during all paving operations for use in checking the smoothness of the surface.

The finished surface of the asphalt concrete pavement shall be placed three - eighths inch ( 3/ 8") above the gutter lip to allow full compaction of the asphalt at the gutter edge and to prevent damage to the gutter lip caused by the roller.

At curb ramps the finished surface of the asphalt concrete pavement shall be placed one -eighth inch ( 1/ 8") above the gutter lip. If the asphalt concrete surface is more than one -quarter inch ( 1/ 4") above the lip or if the slope of the asphalt concrete surface at the gutter lip exceeds five percent ( 5%), the Contractor shall grind the pavement until it is equal to or less than five percent ( 5%) and flush with the gutter lip.
302- 5. 7 Joints.

Add the following paragraph to this subsection:

Joints between successive runs shall be placed to match striped lane lines. If this placement pattern cannot be met, joints between successive runs shall be in the center of the driving lane. 302- 5. 8 Manholes ( and Other Structures).

Add the following paragraphs to this subsection:

The Contractor shall mark out and note locations of all manholes, covers, survey monuments, vaults, and other structures located at the street surface before paving operations commence. As the 141
06/24/2025
C10
152 of 352
paving operation proceeds, the Contractor shall mark all manholes and other structures with paint for the owner' s ease in locating them in case of an emergency.

The Contractor shall adjust all storm drain manholes, sewer cleanouts and manholes, water valve sleeves and covers, survey monument covers and other structures requiring adjustment to the finished grade within the areas to be paved or planted in accordance with these Project Specifications and the Standard Specifications. The Contractor shall coordinate the adjustment of the covers with the associated utility owner and make sure the utility covers are uncovered and adjusted to grade immediately after the final paving to maintain access in case of an emergency. Frames and covers may need to be temporarily adjusted to be safe and provide access to the utilities during separate base course and surface course paving operations, but only the final adjustment will be a pay item.

Repaving required as a result of reconstruction or adjusting frames and covers to grade shall be the responsibility of the Contractor and the cost thereof shall be included in the bid price paid for the related items of work requiring such adjustment.

Sewer and storm drain manholes belonging to Vista shall be adjusted or reconstructed in accordance with the Vista Sewer System Design Standard Specifications. Manholes are either twenty- four inch ( 24") single covers or thirty- six inch ( 36") two- piece covers. Some manholes have existing cast- iron adjustment rings. For manholes that are in good condition and have no more than one cast- iron adjustment ring, the Contractor may adjust the manholes to grade using another cast- iron adjustment ring, for a maximum of two cast- iron rings. If the grout around the upper precast concrete riser rings or the frame is defective, the Contractor shall adjust the manhole to grade by removing the cover and frame, salvaging the cast- iron rings, and removing the precast concrete rings until the grout in the remaining precast concrete rings is in good condition, as determined by the Engineer. Then the Contractor shall adjust the frame and cover to grade using new precast concrete riser rings. If the cover is sitting low in the existing frame or adjustment ring, or the frame or cover is defective, the Contractor shall salvage the existing frame, cover, and rings, supply a new frame and cover, and adjust the new frame and cover to grade using precast concrete riser rings. If any manhole is defective to the extent that it requires fifteen inches or more ( 15"+) of pre -cast concrete riser rings to adjust the cover to grade, the Contractor shall reconstruct the manhole as described in the Specifications.

The Contractor shall exercise care so that surface materials such as rocks, dirt, and debris do not enter sewer lines, manholes, valve and cleanout sleeves, and other utility structures. In order to prevent contamination, Contractor shall provide a three- quarter inch ( 3/ 4") thick plywood platform to be placed on the concrete shelf at the bottom of sewer manholes prior to cold milling pavement work.

The shape of this platform shall conform to the circumference of the inside wall at the shelf elevation.

After the manhole had been adjusted, the material accumulated on the plywood shelf along with the plywood shelf shall be removed from the manhole and disposed of in accordance with Subsection 300- 1. 3 (" Removal and Disposal of Materials.") The Contractor shall remove all debris from the interior of manholes, valve covers, and cleanouts and shall clean all foreign material from the top of the frames and covers.

Within five ( 5) Working Days of placing the asphalt concrete, the Contractor shall complete the adjustment of the manholes and miscellaneous utility frames and covers to grade. Immediately after the overlay operation, the Contractor shall mark all manhole and miscellaneous utility frames and cover locations with paint for ease of locating them in case of an emergency. 142
06/24/2025
C10
153 of 352
The tops of reset manholes and miscellaneous utility frames and covers shall meet the smoothness requirements as specified in Subsection 302- 5. 6. 2 (" Density and Smoothness.") and be reconstructed per the City of Vista Standard Drawing SWR- 33 (" SEWER MANHOLE RECONSTRUCTION").
302- 5. 9 Measurement and Payment.

Revise the first paragraph of this subsection to read as follows:
302- 5. 9 Measurement and Payment. Asphalt concrete pavement will be paid for at the Contract Unit Price per Ton as shown in the bid. Quantities of asphalt concrete pavement will be determined by adding up the total of all certified material tickets for asphalt concrete delivered and placed for the Project. The unit price bid for asphalt concrete pavement shall include full compensation for clearing and grubbing, unclassified excavation and fill, cold milling, subgrade preparation and applying tack coat, supplying and placing the base course and surface course asphalt concrete, compacting and finishing the asphalt concrete pavement, and all other related items of work, and no additional compensation will be allowed. Re -setting or adjusting manholes, covers, vaults, valves, boxes or other miscellaneous facilities to grade will be paid for as provided in Subsection 301- 1. 7 (" Payment.").

Add the following paragraphs:

The tonnage of all asphalt concrete pavement including two inch ( 2") Asphalt Concrete Overlay calculated using a density of asphalt of one hundred fifty five pounds per cubic foot ( 155 lbs./ ft3) in the following formula:

Tons of AC = ( Area in sq. ft.) x (Thickness in inches) x ( Unit Weight in lbs./ cu. ft.) / ( 24, 000) This formula will be used to adjust the tonnage based on the actual density of the asphalt concrete installed. The Contractor and Inspector shall measure the square footage of installed asphalt pavement for each completed section daily and adjust the calculated tonnage by the actual density to determine the theoretical tonnage at a thickness of two inches ( 2"). The theoretical tonnage will be compared to the certified material tickets for surface course asphalt concrete. The certified material tickets will be paid up to 1.03 times the theoretical tonnage for each section.

For other pavement areas where new structural section of asphalt concrete on aggregate base is being constructed, asphalt concrete pavement on aggregate base will be paid for at the Contract Unit Prices as shown in the bid. Quantities to be measured by the square foot will include all areas where existing asphalt concrete is removed, the street section is excavated to subgrade, the subgrade is prepared, aggregate base is placed and compacted, and asphalt concrete pavement is placed over the base. The unit price bid for this bid item shall include full compensation for clearing and grubbing; saw cutting, cold milling or other method of pavement removal; unclassified excavation fill; subgrade preparation; construction of aggregate base; applying tack coat; supplying and placing the initial asphalt concrete base course pavement; supplying and placing the asphalt concrete surface course; compacting and finishing the asphalt concrete pavement, and all other related items of work, and no 143
06/24/2025
C10
154 of 352
additional compensation will be allowed. Re -setting or adjusting manholes, covers, vaults, boxes or other facilities to grade will be paid for as provided in Subsection 301- 1. 7 (" Payment."). The specified thickness will be used to calculate the theoretical quantity, using the same formula as the pavement resurfacing.
302- 6 PORTLAND CEMENT CONCRETE PAVEMENT.
302- 6. 1 General.

Insert the following after the first sentence of the first paragraph:

Formwork shall be approved by the Engineer before placing concrete. The work shall include, but not be limited to, the saw cutting, removal and disposal of AC and sub -base, sub -grade preparation, base material, compaction, placement, materials, rebar, all labor, tools, equipment and incidentals necessary to do all of the work as specified on the Plans or as directed by the Engineer.

SECTION 303 - CONCRETE AND MASONRY CONSTRUCTION
303- 1 CONCRETE STRUCTURES.
303- 1. 1 General.

Add the following paragraph to this subsection:

Concrete footings for traffic signals and street lights and other structures such as steps, ramps and walls shall conform to these Plans, City of Vista Standards, Caltrans Standard Plans and Standard Specifications, the California Building Code ( CBC) and the San Diego Regional Standard Drawings SDRSD). If not otherwise specified in the Caltrans Specifications, concrete footings shall conform to these specifications and shall be approved by the Engineer. Full compensation for all required work to construct concrete footings will be considered as included in the related items of work. 303- 4 MASONRY CONSTRUCTION
Add the following new subsections:
303- 5 CONCRETE CURBS, WALKS, GUTTERS, CROSS GUTTERS, ALLY INTERSECTIONS, ACCESS RAMPS, AND DRIVEWAYS.
303- 5. 1 Requirements.
303- 5. 1. 1 General.

Revise the second paragraph of this subsection to read as follows:

Unless otherwise prescribed in Subsection 303- 5. 1.3 (" Driveway Entrances."), the minimum thickness of walks shall be four inches ( 4"). The height of curbs and the thickness of gutters, cross gutters, alley intersections, curb ramps and driveway aprons shall be as shown on the Plans. 144
06/24/2025
C10
155 of 352
303- 5. 1. 2 Drainage Outlets Through Curb.

Revise the first paragraph of this subsection to read as follows:

Where existing building or yard drains occur along the line of the Work, the new curb shall be suitably sleeved to provide for the continued function of such drains. Similar sleeves shall be installed to serve low areas on adjacent property where drainage has been affected by the Work. 303- 5. 1.3 Driveway Entrances.

Add the following paragraphs to this subsection:

Where walk is constructed adjacent to driveways, both commercial and residential, provisions shall be made for an accessible walkway within the right- of- way at the back of the sloped driveway apron, with a minimum width of forty- eight inches ( 48") and a maximum cross slope of two percent ( 2. 00%).

The longitudinal slope of the walk shall match the slope of the street, taken at the gutter lip or gutter flow line.

PCC Driveway Entrances and PCC Driveways shall be in accordance with City of Carlsbad standards.
303- 5. 1. 4 Curbs.

Add the following new subsection:
303- 5. 1. 4 Curb and Gutter. PCC Curb and Gutter shall be formed along the gutter lip using specified form material. For projects where curb and gutter is being constructed adjacent to existing pavement, a section of pavement twelve inches ( 12") wide, measured from the lip of the gutter, shall be removed to allow for the gutter lip to be formed. The twelve inch ( 12") slot shall be paved after the curb and gutter is fully cured, to avoid damage from paving operations.

The Contractor shall exercise great care to construct curbs conforming strictly to ADA standards at locations where curb ramps will be constructed. The curb face shall be depressed to a flush surface with no lip at the flowline. The slope of the asphalt leading up to the curb ramp shall not exceed five percent ( 5. 00%) for a distance of four feet ( 4') with a maximum two percent ( 2. 00%) cross slope per SDRSD No. G- 32A.

The Contractor shall install eight inch ( 8") mow curb in accordance with the San Diego Regional Standard Drawing ( SDRSD) No. L-3 (" CONCRETE MOWING STRIP"). All mow curb shall be reinforced as shown on the standard drawing. New mow curb shall have weakened plane joints every ten feet 10'), and expansion joints every thirty feet ( 30') and where new mow curb joins other improvements. 145
06/24/2025
C10
156 of 352
The Contractor shall identify locations of water and sewer laterals by stamping a " W" for water service and an " S" for sewer laterals in the green concrete curb after finish troweling is complete. The stamps shall be professionally fabricated, with letters three inches ( 3") high.

Expansion joints are required only at beginning and ending of curb returns. 303- 5. 1. 5 Wa Iks.

Add the following new subsection:
303- 5. 1. 5 Walks. Sidewalks shall be constructed in strict conformance with ADA standards. The cross slope on sidewalks shall in no case exceed two percent ( 2. 00%). The clear width of sidewalk shall not be less than forty- eight inches ( 48"), measured from the back of curb. Construction tolerances shall not be a reason to exceed the minimum or maximum standards of the ADA. The width of the top of the curb cannot be counted as part of the sidewalk clearance.

If a monolithic retaining curb at the back of curb ramp or sidewalk with a maximum height of six inches ( 6") is required to minimize erosion or match existing improvements or earth, the Contractor shall construct those retaining curbs at the back of the curb ramp or sidewalk to the limits determined by the Engineer. Retaining curbs shall not reduce the sidewalk clear width below the minimum of forty- eight inches ( 48").

Where curbs are sleeved to provide connections to the gutter for yard drains, new sidewalk shall be constructed with under - sidewalk drains, in accordance with Subsection 306- 7 (" Curb Drains.") and SDRSD D- 27 (" SIDEWALK UNDERDRAIN PIPE").

Any irrigation facilities removed or adjusted for the construction of the sidewalk or other work shall be replaced, relocated, or re -configured with similar materials, so that the irrigation system is fully functional. Unless there is a bid item for landscaping and irrigation, payment for this work will be considered as included with other items of work.

Any turf, sod or landscaping removed adjacent to the Work for the construction of the sidewalk shall be replaced with new turf, sod or landscaping of the same type from a commercial nursery.

Unless there is a bid item for landscaping and irrigation, payment for this work will be considered as included in the related items of work.

Expansion joints are required only at beginning and ending of curb returns. 303- 5. 2 Forms.
303- 5. 2. 2 Slip -Forms.

Add the following sentence to the end of the first paragraph:

Contractor shall give Engineer the opportunity to confirm the slip -form shoe is set at the correct batter for the concrete curb and gutter.
146
06/24/2025
C10
157 of 352
303- 5. 5 Finishing.
303- 5. 5. 4 Gutter.

Add the following before the first sentence of the first paragraph:
303- 5. 5. 4 Gutter. Cross gutters and spandrels shall be constructed in accordance with the Plans.

Prior to acceptance of the valley gutter constructed by the Contractor, a flow test shall be conducted by the Contractor in the presence of the Engineer. Any new work found to be defective shall be repaired or replaced by the Contractor in accordance with Subsection 303- 5. 7 (" Repairs and Replacements."). 303- 5. 7 Repairs and Replacements.

Revise this subsection to read as follows:
303- 5. 7 Repairs and Replacements. Any new work found to be defective or damaged, cracked, chipped, discolored, improperly finished, heaved, vandalized, or for any other reason does not conform to the specifications, prior to its acceptance, shall be replaced by the Contractor, at the Contractor' s expense, as approved by the Engineer.

The Contractor shall exercise great care in the construction of curb ramps to ensure compliance with the ADA standards. Any curb ramps that do not satisfy the ADA requirements in any aspect, including exceeding the minimum or maximum values by ANY amount, shall be removed and replaced by the Contractor at his expense. Construction tolerances shall not be a reason to exceed the minimum or maximum standards of the ADA.
303- 5. 9 Measurement and Payment.

Revise this subsection to read as follows:
303- 5. 9 Measurement and Payment. The BID SCHEDULE lists various items that include concrete construction. Items of work shall be measured and paid for as shown in the Bid.

PCC Pavement" for private driveway or flatwork shall be measured and paid for by the square foot as stated in the BID SCHEDULE. Quantities of " PCC Pavement" will be measured from the limit of the public PCC Driveway Entrance or public Alley -Type Drivewayto the pointwhere the new private driveway joins existing improvements, for the full width of the new driveway surface, typically on private property, or to the limits of the new PCC pavement as shown on the Plans. Full compensation for any necessary work required to perform the construction operations specified or shown on the Plans including clearing and grubbing, earthwork, subgrade preparation, placing reinforcing steel and dowels, adjusting locations of the removal and replacement limits to match existing joints or reduce the slope of the driveway surface, adjusting the profile of the new driveway surface to join existing improvements with a smooth transition and no sharp grade breaks and installing joints per SDRSD G-9 and G-10 SIDEWALK JOINT LOCATIONS" and " CONCRETE JOINT DETAILS") will be considered as included in the square foot price bid for " PCC Pavement" and no additional compensation will be allowed therefore.
147
06/24/2025
C10
158 of 352
PCC Sidewalk shall be measured and paid for by the square foot as stated in the BID SCHEDULE.

Quantities of PCC Sidewalk will be measured from the back of the curb to the back of the walk, and between adjacent concrete improvements covered by separate items in the bid, such as driveway entrances, curb ramps, cross gutters or alley aprons. The top surface of monolithic retaining curb with a maximum height of six inches ( 6") will be included in the quantity of sidewalk. Full compensation for any necessary work required to perform the construction operations specified or shown on the Plans, including clearing and grubbing, earthwork, grading adjacent swales for drainage, subgrade preparation, placing reinforcing steel and dowels, installing joints per SDRSD Nos. G-9 and G-10 SIDEWALK JOINT LOCATIONS" and " CONCRETE JOINT DETAILS"), installing under -sidewalk drain pipes through curb sleeves to the gutter and providing monolithic retaining curbs ortoe curbs as shown on the Plans or where designated by the Engineer, will be considered as included in the square foot price bid for PCC Sidewalk and no additional compensation will be allowed therefore.

PCC Curb Ramp shall be constructed in strict conformance with ADA standards and shall be paid for per each as specified on the BID SCHEDULE. The pay limit for each pedestrian access ramp ( or curb ramp) will include the area within the measurements from the back of the street curb, up to and including the twelve inch ( 12") wide border at the top of the ramp ( or ramps) and the ramp wings or integral curbs that make up the side of the curb ramp, which surrounds the truncated dome detectable warning surface pad. Intermediate landings within the limits of the main ramp will be included in the measurement for pedestrian access ramps ( or curb ramps). Concrete flatwork for the top landings, transition areas and ramping areas outside the border surrounding the truncated domes, and additional twelve inch ( 12") wide borders at the top of the secondary ramping areas will NOT be included in the measurement for pedestrian access ramps ( or curb ramps), but WILL BE measured and paid for with PCC Sidewalk. If integral curbs and hand railings are required for pedestrian access ramps ( or curb ramps), that work shall be included in the price paid for pedestrian access ramp ( or curb ramp) as shown in the bid. Full compensation for any necessary work required to perform the construction operations specified or shown on the Plans, including clearing and grubbing, earthwork, subgrade preparation, placing reinforcing steel and dowels, constructing a landing area in the street at the bottom of pedestrian access ramps ( or curb ramps), installing detectible warning surface pads, constructing integral curbs and handrails, and strictly complying with all ADA standards, will be considered as included in the per each price bid for PCC Pedestrian Access Ramp ( or PCC Curb Ramp) and no additional compensation will be allowed therefore.

PCC Cross gutter shall be measured and paid for by the square foot as stated in the BID SCHEDULE. Quantities of cross gutter will be measured along the line of the gutters and spandrels and include the monolithic curb around curb returns and across curb ramps, between adjacent concrete improvements covered by separate items in the bid, such as curb and gutter and curb ramps.

Only the top surface of the monolithic curb will be included in the measurement. Full compensation for any necessary work required to perform the construction operations specified or shown on the Plans, including clearing and grubbing, earthwork, subgrade preparation, installing joints per SDRSD Nos. G- 9 and G- 10 (" SIDEWALK JOINT LOCATIONS' and " CONCRETE JOINT DETAILS"), depressing curbs for curb ramps, constructing a landing area in the spandrel at the bottom of the ramp, shaping the gutter and spandrel for proper drainage so water does not pond in front of the curb ramp landing, and water testing for proper drainage patterns, will be considered as included in the square foot price bid for PCC Cross Gutter and no additional compensation will be allowed therefore. 06/24/2025
C10
159 of 352
For other items of work that include concrete construction for which there is no bid item, the cost of such items shall be included in the related Bid Items. Full compensation for any necessary work required to perform the construction operations specified or shown on the Plans will be considered as included in the price bid for the related items of work and no additional compensation will be allowed therefore.
303- 6 STAMPED CONCRETE.
303- 6. 2 Concrete Placement.

Replace the last sentence to read as follows:

The minimum size aggregate shall be 3/4". Concrete shall be tamped before stamping. 303- 6. 3 Pattern.

Revise the first paragraph to read as follows:
303- 6. 3 Pattern. The stamped concrete shall match existing median pattern. The pattern shall be implanted, indented, imprinted, or stamped into the surface by means of forms, molds, or other approved devices. The impressions shall be approximately 3/ 8" in width, not to exceed one- half inch 1/2") in depth and be ungrouted unless otherwise specified. Expansion joints and control joints shall be located so as not to disrupt the pattern. Medians shall be stamped such that the continuous lines of the pattern are approximately perpendicular to the curb lines and the staggered lines of the pattern are approximately parallel to the curb lines.
303- 7 COLORED CONCRETE.
303- 7. 1 General.

Revise the first sentence to read as follows:
303- 7. 1 General. Colored concrete shall be Scofield pigment color " Sorrento Red # 5059" produced by Method B ( Integral Color) as specified below.

Add the following subsection:
303- 7.5 Measurement and Payment. The payment for stamped, colored concrete shall be made at the price per square foot shown in the Bid. The Bid price shall include full compensation for all work required to stamp and color the concrete in the median strip, including, but not limited to, providing a sample before performing the work, supplying pigments and other materials, placing the colored concrete, stamping the concrete with the appropriate tools, finishing and curing the colored concrete with the required " Sorrento Red # 5059" curing compound, and sealing the colored concrete per the recommendations of the colored pigment manufacturer; and all other materials, labor, and equipment necessary to properly construct all the stamped, colored concrete, and no additional compensation will be allowed.
149
06/24/2025
C10
160 of 352
SECTION 306 - UNDERGROUND CONDUIT CONSTRUCTION
306- 1 OPEN TRENCH OPERATIONS.
306- 1. 1 Trench Excavation.
306- 1. 1. 1 General.

Add the following paragraphs after the third paragraph:

The groundwater removal work shall include furnishing, installing, and operating a dewatering system capable of dewatering any excavation for any work in progress or planned, and subsequent removal of such equipment from the site.

The Contractor shall limit the area to be excavated at any one time to that area which can be properly dewatered by the equipment in use. The equipment in use shall be both capable of removing any water that accumulates in the excavation and maintaining the excavation in a dry condition while construction is in progress. The surface of the ground shall be sloped away from the excavation or temporary dikes or pipe culverts provided to prevent surface water from entering the excavation.

Disposal of the water from the dewatering system shall be in such a way as not to damage or overload the existing drainage facilities in the area. Protect from injury any portion of the Work completed or in progress, surfaces of streets, lawns or private property. No water shall be directed across a public street outside the construction limits.

All water encountered during the excavation shall be disposed of by the Contractor in such a manner as will not damage public or private property or create a nuisance or health menace. The Contractor shall furnish, install, and operate pumps, pipes, appliances, and equipment of sufficient capacity to keep all excavations free from water until the excavation is backfilled, unless otherwise authorized by the Engineer. The Contractor shall provide all means or facilities necessary to conduct water to the pumps.

Discharge of pumped groundwater shall be in conformance with the requirements of the Regional Water Quality Control Board, the County of San Diego Department of Environmental Health, the City of Vista, and other agencies having jurisdiction. The Contractor shall obtain all required permits before pumped water from naturally occurring groundwater or from rainfall is discharged to any storm drain or sewer. A means shall be provided for desilting the water before discharging it where required by the Engineer or by the terms of the discharge permits.
306- 1. 1. 5 Removal and Replacement of Surface Improvements.

Revise this subsection to read as follows:
306- 1. 1. 5 Removal and Replacement of Surface Improvements. Bituminous pavement, concrete pavement, landscaping, fences, curbs, sidewalks, or driveways removed in connection with construction shall be removed and reconstructed in accordance with these specifications. 150
06/24/2025
C10
161 of 352
306- 1. 3 Backfill and Densification.
306- 1. 3. 1 General.

Add the following after the third paragraph:

Material obtained from the project excavations may only be used as backfill after it has been determined to be acceptable and approved by the Geotechnical Engineer and the Engineer. 306- 1.3.4 Backfilling Narrow Trenches.

Revise the first paragraph of this subsection to read as follows:
306- 1.3. 4 Backfilling Narrow Trenches. All narrow trenches for electrical and irrigation work shall be backfilled immediately after inspection and approval of the conduit placement by the Agency Inspector to minimize the length of time traffic control is required for the trench work. Narrow trenches are defined as ten inches ( 10") or less in width. Backfill for narrow trenches shall be placed as specified in Subsection 306- 1. 3. 1 (" General.") except as modified herein. Narrow trenches shall be backfilled by use of trench backfill slurry per Subsection 201- 1 (" PORTLAND CEMENT CONCRETE."), unless otherwise approved by the Engineer. Asphalt Concrete resurfacing of the trench per City of Carlsbad Standard Drawings.
306- 1.3. 5 Jetted Bedding and Backfill Compaction Requirements.

Replace the first paragraph with the following:
306- 1.3. 5 Jetted Bedding and Backfill Compaction Requirements. Except as specified otherwise, trench bedding and backfill densified thru jetting shall be densified to a minimum ninety percent ( 90%) relative compaction.
306- 1. 5 Trench Resurfacing.
306- 1.5. 1 Temporary Resurfacing.

Modify the fourth paragraph to read as follows:

Full compensation for the furnishing, placing, maintaining, removing, and disposing of temporary resurfacing materials shall be included in the unit price of the underground conduit. 306- 6 Traffic Control Devices
307- 17. 7 Vehicle Detectors.
307- 17. 7. 3 Inductive Loop Detectors.
307- 17. 7. 3. 1 General.
151
06/24/2025
C10
162 of 352
Add the following paragraphs to this subsection:

The Contractor shall mark out and document all locations of existing loop detectors, advanced loops, and home runs, before they are taken out of service, so that the existing loops can be replaced in -place. The mark -outs and documentation shall be approved by the inspector before work that disturbs the loops begins. The Contractor shall coordinate with the Inspector to confirm that all loops are working prior to being taken out of service.

New loops shall be installed in the new pavement surface course. Bicycle -sensitive detector loops shall be installed where shown on the Plans, or as specified. After the pavement work is completed, the Contractor shall return the detector loops to full operation. 307- 17. 7. 7 Payment.

Replace this subsection with the following:
307- 17. 7. 7 Payment. Payment for constructing each vehicle detectors shall be at the Contract Unit Price or lump sum price in the Bid for each type of detector. If no bid item is included, payment for the work shall be considered included in the related items of work that require vehicle detectors, and no additional compensation will be allowed.

SECTION 308 - LANDSCAPE AND IRRIGATION INSTALLATION
308- 1 GENERAL.

Revise this subsection to read as follows:
308- 1 GENERAL. The surface preparation, construction of irrigation system for landscape areas, and installation of plants required by the Plans shall conform to the City of Carlsbad standard special provisions for landscaping and irrigation and Technical Provisions from these specifications shall not take precedence over other Carlsbad specifications.

The Contractor shall replace / restore all existing landscaping, sod, topsoil, and irrigation disturbed during the course of construction activities. All replacement of sod shall be of the same type as existed and as approved by the Engineer.

All replacement and new installation of landscape and irrigation shall be of the same type, size, caliper, and spacing as existing and as approved by the Engineer. All areas disturbed by construction, not covered by sidewalk or paved materials shall be landscaped and irrigated in accordance with these Technical Provisions.

All new landscaping shall be planted on salvaged topsoil or new Class A imported topsoil for a depth of twelve inches ( 12") as approved by the Engineer. 152
06/24/2025
C10
163 of 352
During surface clearing operations, the Contractor shall not cover or bury any plant growth or other objectionable materials on public or private property. If the Contractor cannot successfully separate the plant growth from the surface soil and advertently or inadvertently mixes organic or other objectionable materials with the soil, the soil so contaminated shall be removed from the site by the Contractor. All costs, if any, associated with removing the soil mixed with organic or other objectionable materials and importing soil to replace said contaminated soil shall be borne by the Contractor and no additional payment shall be made to the Contractor.

The Contractor shall coordinate the removal and reconnection of the existing irrigation system with the property owner. As soon as the improvements in the area where portions of the existing irrigation system had been removed are completed, the Contractor shall reconnect and adjust the irrigation heads so that irrigation may commence. Reconnection may entail replacement and reconfiguration of sprinkler heads for appropriate irrigation coverage. The Contractor shall sufficiently irrigate areas of existing landscaping that are not being irrigated by the compromised irrigation system during the shutdown period.

Any irrigation facilities removed or adjusted for the construction of the sidewalk or other work shall be replaced, relocated, or re -configured with similar materials approved by the Engineer, so that the irrigation system is fully functional and appropriate for the landscaping being irrigated. 308- 7 PAYMENT.

Revise this subsection to read as follows:

Payment for the complete installation of Landscaping & Irrigation shall be at the lump sum price of landscape and irrigation repair as specified in the BID SCHEDULE, and shall constitute full compensation for all materials, labor, equipment, excavation, plant materials, irrigation materials, fine grading, geotechnical ( soil) analysis, topsoil import and placement in all planted areas, sod, and wild flower hydroseed, and all other work and incidentals necessary as specified and not included in a separate bid item and no additional compensation will be allowed therefore.

Payment for all irrigation work as specified in these specifications shall be included in the bid item for Landscaping & Irrigation Repair at the lump sum price bid as shown in the BID SCHEDULE and no additional compensation will be allowed therefore.

SECTION 314 - TRAFFIC STRIPING
314- 4 APPLICATION OF TRAFFIC STRIPING AND CURB AND PAVEMENT MARKINGS. 314- 4. 3 Painting Traffic Striping and Curb and Pavement Markings. 314- 4. 3. 1 General.

Replace the first sentence in the first paragraph with the following. 153
06/24/2025
C10
164 of 352
The work shall consist of applying painted ( including glass beads) traffic striping, curb and pavement markings, concrete wheel strops, and new red curb and blue curb at the locations shown on the Plans.

Add the following paragraphs:

If a portion of a crosswalk or limit line is disturbed by construction, then the entire crosswalk or limit line shall be removed and replaced, or restriped.

All striping, RPM' s, and pavement markings that are disturbed by construction shall be replaced.

If the Plans or Project Exhibits show striping plans, all interfering striping and marking shall be removed, and new striping and marking shall be installed as shown on the plans. If no striping plans are provided, existing striping shall be replaced in kind.

All intersection limit lines, pavement legends, and white crosswalks to be replaced shall be thermoplastic. Other striping and yellow crosswalks shall be painted. New raised pavement markers shall be installed as required by the California Manual on Uniform Traffic Control Devices and the Caltrans Standard Plans, even if they were not previously on the street. Blue raised reflective pavement markers shall be installed at all fire hydrants.

The locations of all signs, including those to be relocated or replaced, must be approved by the Traffic Engineering Division of the Engineering Department before placement. All signs shall be installed on metal sign posts, unless wood posts are specified. If wood posts are called out on the Plan, the posts shall be four inch by four inch ( 4" x 4") pressure - treated unpainted wood, anchored in undisturbed soil a minimum of twenty- four inches ( 24") below finished grade and backfilled with post - hole concrete above twenty inches ( 20") of sand). If in sidewalk area, wood post backfill shall be four inches ( 4") of concrete above twenty inches ( 20") of sand or gravel, inside an eight inch diameter ( 8" o) PVC sleeve. The installation of wood sign posts shall be rejected if posts are damaged, bent or splintered. Technical Provisions from these specifications shall take precedence over other specifications. If not otherwise specified, the work required for Traffic Striping and Signing shall conform to these specifications.
314- 4. 3. 7 Payment.

Replace the subsection in its entirety with the following:
314- 4.3. 7 Payment. The quantities of traffic striping, signing and pavement markings shall be measured as a lump sum, complete in place, as shown on the Plans, and as specified in the BID SCHEDULE. Payment for bid items related to all striping, signing and pavement markings shall be at the lump sum or unit prices specified in the BID SCHEDULE and shall constitute full compensation for all materials, labor, equipment, tools, mobilization, clearing and grubbing, excavation, placing and removing temporary striping and striping tabs, painting legends and pavement markings, salvaging signs and delivering them to the Agency' s Public Works Yard at 1165 E. Taylor Street, installing new signs on new and existing posts or poles, providing, painting and installing concrete wheel stops, painting new red curb and blue curb, painting all parking stalls, handicap legends, and incidentals necessary as specified, and no additional compensation will be allowed. 154
06/24/2025
C10
165 of 352
END OF SECTION***
155
06/24/2025
C10
166 of 352
156
06/24/2025
C10
167 of 352
Appendix A:

Terra Costa Consulting Group, Inc.

Geotechnical Report
157
06/24/2025
C10
168 of 352

EMERGENCY MOD

GENERAL NOTES

CONSTRUCTION PERMIT, FROM THE BUENA SANITATION DISTRICT/ CITY OF VISTA AND THE CITY OF CARLSBAD, IS REQUIRED FOR ALL CONTRACTORS PERFORMING ANY OF THE WORK SHOWN ON THIS PLAN. THE PERMIT CAN BE OBTAINED AT THE CITY OF VISTA COMMUNITY DEVELOPMENT SERVICES CENTER, 200 CIVIC CENTER DRIVE, VISTA, CA.

A PERMIT WILL BE ISSUED ONLY TO THE CONTRACTOR WHO IS TO PERFORM THE WORK. THE PERMITEE SHALL GIVE

NOTICE TO THE CITY OF VISTA ENGINEERING INSPECTION DEPARTMENT FOR A PRECONSTRUCTION CONFERENCE AT LEAST 48 HOURS PRIOR TO COMMENCING THE WORK. ANY WORK DONE WITHOUT PROPER INSPECTION WILL BE SUBJECT TO REJECTION. PHONE: ( 760) 639- 6113 FOR INSPECTION. SEE SHEET 2 FOR PERMIT REQUIREMENTS IN THE CITY OF CARLSBAD.

2. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE LOCATION AND PROTECTION OF ALL UTILTIES. FOR LOCATION OF UNDERGROUND UTILITIES, OR FOR EMERGENCY ASSISTANCE CALL:

UNDERGROUND SERVICE ALERT 811
SAN DIEGO GAS & ELECTRIC ( EMERGENCY) 800) 411- 7343
ATT ( EMERGENCY) DAIL) 611
CARLSBAD MUNICIPAL WATER DISTRICT ( EMERGENCY) 760) 438- 2722 COX CABLE ( EMERGENCY) 760) 599- 6063
ADELPHIA COMMUNICATIONS ( EMERGENCY) 760) 438- 7741
CITY OF VISTA ( COV) ( MAIN NUMBER) 760) 726- 1340
COV) ( ENG. DEPT. DIRECT LINE) 760) 639- 6111
COV) AFTER HOURS EMERGENCY ( EMERGENCY) 858) 756- 3006

DISPATCH FOR SEWER SPILLS
CITY OF CARLSBAD ( COC) ( STREETS/ SD) 760) 434- 2980
CITY OF CARLSBAD ( COC) ( SEWER/ WATER) 760) 428- 2722
VALLECITOS WATER DISTRICT ( MAIN NUMBER) 760) 744- 0460

3. ALL WORK SHALL BE DONE IN ACCORDANCE WITH THESE PLANS, THE STANDARD SPECIFICATIONS FOR PUBLIC WORKS

CONSTRUCTION, AND THE SAN DIEGO SPECIAL SUPPLEMENT TO THE STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION, 2015 EDITION, OR AS OTHERWISE LAST AMENDED.

4. " AS -BUILT" DRAWING( S) SHALL BE SUBMITTED BY THE ENGINEER OF WORK AND APPROVED BY THE CITY ENGINEER PRIOR TO THE ACCEPTANCE OF THE IMPROVEMENTS.

5. THE FOLLOWING NOTES ARE INTENDED TO PROVIDE INSTRUCTION TO THE CONTRACTOR BY THE ENGINEER OF WORK.

THE CITY ENGINEER' S SIGNATURE ON THESE PLANS DOES NOT CONSTITUTE APPROVAL OF ANY OF THESE NOTES, AND THE CITY WILL NOT BE RESPONSIBLE FOR THEIR ENFORCEMENT.

6. NEITHER THE OWNER NOR THE ENGINEER OF WORK WILL ENFORCE SAFETY MEASURES OR REGULATIONS. THE

CONTRACTOR SHALL DESIGN, CONSTRUCT, AND MAINTAIN ALL SAFETY DEVICES, INCLUDING SHORING, AND SHALL BE

SOLELY RESPONSIBLE FOR CONFORMING TO ALL LOCAL, STATE, AND FEDERAL SAFETY AND HEALTH STANDARD, LAWS, AND REGULATIONS.

7. CONTRACTOR SHALL MAKE EXPLORATION EXCAVATIONS AND LOCATE EXISTING UNDERGROUND FACILITIES WITHIN A 30 DAY SCHEDULE PRIOR TO CONSTRUCTION TO PERMIT REVISIONS TO PLANS IF REVISIONS ARE NECESSARY BECAUSE OF ACTUAL LOCATION OF EXISTING FACILITIES. NOTIFY ENGINEER OF WORK OF ANY DISCREPANCIES BETWEEN THESE PLANS AND ACTUAL FIELD CONDITIONS PRIOR TO STARTING CONSTRUCTION.

8. LOCATION AND ELEVATION OF IMPROVEMENTS TO BE MET BY WORK TO BE DONE SHALL BE CONFIRMED BY FIELD MEASUREMENTS PRIOR TO CONSTRUCTION OF NEW WORK.

9. BEFORE EXCAVATING FOR THIS CONTRACT, VERIFY LOCATION OF UNDERGROUND UTILITIES. THE EXISTENCE AND

LOCATION OF ANY UNDERGROUND UTILITY PIPES OR STRUCTURES SHOWN ON THESE PLANS HAS BEEN OBTAINED FROM AVAILABLE RECORDS ONLY AND MAY NOT REFLECT ALL EXISTING UTILITIES. LOCATIONS OF ALL EXISTING UTILITIES SHALL BE CONFIRMED BY FIELD MEASUREMENTS BY CONTRACTOR PRIOR TO CONSTRUCTION OF WORK.

10. CONTRACTOR IS REQUIRED TO TAKE PRECAUTIONARY MEASURES AND POTHOLE CROSSING UTILITIES AND REPORT FINDINGS TO ENGINEER AT LEAST 14 DAYS PRIOR TO EXCAVATION TO PROTECT AND UTILITY LINES SHOWN HEREON INCLUDING ALL OTHER UTILITY LINES NOT SHOWN.

11. WHERE TRENCHES ARE ADJACENT TO FUTURE BUILDINGS SITES, SOILS REPORTS WHICH CERTIFY THAT TRENCH

BACKFILL WAS COMPACTED AS DIRECTED BY THE SOILS ENGINEER IN ACCORDANCE WITH THE ON -SITE EARTHQUAKE SPECIFICATIONS SHALL BE SUBMITTED TO THE ENGINEER OF WORK BY A QUALIFIED SOILS ENGINEER.

12. SAFETY FENCES SHALL BE PROVIDED BY THE CONTRACTOR WHERE REQUIRED BY THE CITY ENGINEER.

13. DURING ACTIVE CONSTRUCTION, AREAS SHALL BE WATERED TO REDUCE FUGITIVE DUST.

14. CONTRACTOR SHALL ADJUST ALL PROPOSED AND EXISTING FACILITIES TO GRADE.

15. CONTRACTOR SHALL REMOVE/ REPLACE/ RELOCATE ALL EXISTING FACILITIES REQUIRED TO INSTALL PROPOSED IMPROVEMENTS, INCLUDING TRAFFIC LOOP DETECTORS.

16. CONTRACTOR SHALL REMOVE/ REPLACE/ RELOCATE ANY LANDSCAPING/ HARDSCAPING INCLUDING IRRIGATION PIPING

WHICH CONFLICTS IN ANY WAY WITH THE INSTALLATION OR PROPER FUNCTIONING OF THE PROPOSED IMPROVEMENTS.

17. CONTRACTOR SHALL OBTAIN AN EXCAVATION PERMIT FROM THE DIVISION OF INDUSTRIAL SAFETY BEFORE ANY EXCAVATION AND SHALL ADHERE TO ALL PROVISIONS OF THE STATE CONSTRUCTION SAFETY ORDERS.

18. CONTRACTOR MUST COMPLY WITH THE PROJECT' S MITIGATION MONITORING AND REPORTING PROGRAM ( MMRP) .

19. ALL CONSTRUCTION RELATED ACTIVITIES AND IMPACTS INCLUDING WORK WITHIN CONTRACTOR APPROVED STAGING AREAS SHALL NOT BE WITHIN ANY SENSITIVE HABITAT.

UNDERGROUND SERVICE ALERT
SECTION 4216 & 4217 OF THE GOVERNMENT CODE REQUIRES A

DIG ALERT IDENTIFICATION NUMBER BE ISSUED BEFORE A
Know wnatsbelow. "
PERMIT TO EXCAVATE" WILL BE VALID. FOR YOUR DIG ALERT I. D.

Call beforeyoudig. NUMBER CALL UNDERGROUND SERVICE ALERT TOLL FREE @ B11 TWO ( 2) WORKING DAYS BEFORE YOU DIG.

WEB ADDRESS: WWW. DIGALERT. ORG
IMPROVEMENT PLANS FOR:

IFICATIONS - BUENA OUTFACE FORCE MAIN
PHASE III ( CIP 8131)

SEWER NOTES

1. ALL SEWER IMPROVEMENTS SHALL BE DONE IN ACCORDANCE WITH THIS PLAN, THE STANDARD

SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION, THE SAN DIEGO REGIONAL STANDARD DRAWINGS ( SDRSD), AND THE CITY OF VISTA DRAWINGS ( COVSD), ALL AS LAST AMENDED. WHERE CONFLICTS ARISE, THE MORE STRINGENT SHALL PREVAIL.

2. THE CONTRACTOR MUST MAINTAIN ONSITE A SANITARY SEWER OVERFLOW PREVENTION AND RESPONSE ( SSOP& R) PLAN. PLAN MUST BE REVIEWED BY THE CITY/ DISTRICT ENGINEER BEFORE ANY WORK THAT MAY AFFECT ACTIVE PRIVATE OR PUBLIC SEWER FLOW. SHOULD A SPILL OCCUR,

THE CONTRACTOR SHALL CONTAIN THE SEWAGE FROM ENTERING WATER SURFACE AREAS AND

IMMEDIATELY CALL THE DISTRICT WASTEWATER DEPARTMENT AND INSPECTOR FOR INSPECTION, RESPONSE, AND REPORTING.
a. CITY OF VISTA/ BUENA SANITATION DISTRICT ( 7:30 AM TO 3:30 PM) ( 760) 726- 140 b. AMERICAN MESSAGING SERVICE ( AFTER WORKING HOURS) ( 800) 800- 9456

3. THE CONTRACTOR IS LIABLE FOR ANY AND ALL COSTS INCURRED BY THE CITY/ DISTRICT FOR

RESPONSE AND REPORTING, IN ADDITION TO ANY FINES AND PENALTIES THAT MAY APPLY REF. COV/ BSD SSOP& R, EWQCB 96- 04).

4. CONTRACTOR SHALL OBTAIN A CITY OF CARLSBAD RIGHT- OF- WAY PERMIT FOR ANY EXCAVATION WITHIN RIGHT- OF- WAY.

5. CONTRACTOR SHALL ACQUIRE A TRENCHING PERMIT FROM THE CALIFORNIA DIVISION OF INDUSTRIAL SAFETY ( CAL OSHA), IF REQUIRED, FOR ALL TRENCH WORK. COPY OF PERMIT SHALL BE SUBMITTED TO THE ENGINEER PRIOR TO START OF WORK.

6. THE CONTRACTOR SHALL NOTIFY THE ENGINEERING DEPARTMENT 48 HOURS IN ADVANCE OF BEGINNING WORK TO ARRANGE FOR INSPECTION ( 24- HOUR PHONE: ( 714- 639- 6113).

7. TRENCHING, PIPE BEDDING, BACKFILL, AND TRENCH WIDTH SHALL BE PER COVSD NO. SWR- 11 OR AS SHOWN ON THE PLANS. FILL AREAS MUST BE COMPACTED TO MINIMUM 95 PERCENT RELATIVE COMPACTION PRIOR TO PIPE INSTALLATION.

8. UNLESS OTHERWISE NOTED AS PREVIOUSLY POTHOLES ( PH) ELEVATIONS SHOWN ON THE PROFILE

FOR THE EXISTING UTILITIES ARE BASED ON A SEARCH OF THE AVAILABLE RECORDED INFORMATION ONLY AND ARE SOLELY FOR THE CONTRACTOR' S CONVENIENCE. THE CITY/ DISTRICT

DOES NOT GUARANTEE THAT IT HAS REVIEWED ALL AVAILABLE DATA PRIOR TO EXCAVATION,

CONTRACTOR SHALL VERIFY ALL EXISTING UTILITIES EITHER SHOWN ON THE PLANS OR MARKED IN THE FIELD IN ACCORDANCE WITH THE SPECIFICATIONS SECTION 5- 1.

9. AFTER COMPLETION OF PIPE LAYING AND THE INSTALLATION OF ALL SEWER STRUCTURES, AND

BEFORE PAVING, ALL MAIN LINE SEWERS, PRIVATE SEWER SERVICE LATERALS, AND STRUCTURES SHALL BE TESTED IN THE PRESENCE OF THE CITY/ DISTRICT ENGINEER OR HIS REPRESENTATIVE.

THE SEWER MAINS SHALL FIRST BE WAYNE BALLED, MANDRELED, AIR TESTED, AND THEN TELEVISED. MANHOLES SHALL BE VACUUM TESTED IN COMPLIANCE WITH ASTM C 1244- 93 BEFORE FINAL PAVING OR ACCEPTANCE OF SEWER MAINS, LATERALS, AND APPURTENANCES. VIDEO AND

REPORT SHALL BE PERFORMED USING NATIONAL ASSOCIATION OF SEWER SERVICE COMPANIES NASSCO) STANDARDS AT THE EXPENSE OF THE CONTRACTOR.

10. MANHOLE COVERS FOR PRIVATE SEWER SYSTEMS SHALL HAVE " PRIVATE SEWER" CAST INTO THE LID. PUBLIC COVERS SHALL HAVE " BUENA SANITATION DISTRICT" CAST INTO THE LID. MANHOLE COVERS AND RISER RINGS SHALL BE CONSTRUCTED IN ACCORDANCE WITH COVSD NO. SWR- 29 AND SWR- 30.

11. DETAILED RECORD DRAWINGS SHALL BE MAINTAINED AND UPDATED ON A DAILY BASIS BY THE CONTRACTOR DURING CONSTRUCTION AND SUBMITTED TO THE ENGINEER OF WORK. " AS -BUILT"

DRAWINGS SHALL BE SUBMITTED BY THE ENGINEER OF WORK TO THE CITY/ DISTRICT INSPECTOR PRIOR TO ACCEPTANCE OF THE PUBLIC SEWER SYSTEM. FINAL LOCATION AND ELEVATIONS OF

SEWER MAIN, MANHOLES, LATERALS, CLEANOUTS AND OTHER UTILITIES SHALL BE SHOWN ON THE RECORD DRAWINGS AND THE " AS BUILT" DRAWINGS.

12. ENTRY TO MANHOLES IS PERMIT - REQUIRED CONFINED SPACE ENTRY ( REF. SEC. 5156, 5157, AND 5158 OF CALIFORNIA OSHA TITLE 8 CCR GISO). SAID PERMIT AND PLAN MUST BE ISSUED BEFORE EACH ENTRY, MAINTAINED ONSITE AND PRESENTED TO CITY/ DISTRICT ENGINEER UPON REQUEST.

NON- COMPLIANCE MAY RESULT IN DEATH, FINES, OR IMPRISONMENT.

13. CONNECTIONS TO EXISTING SEWER PIPE OR MANHOLES SHALL ONLY BE DONE IN THE DIRECT PRESENCE OF THE DISTRICT INSPECTOR.

PALOMAR
i
m
Q
w
C3
T
GOLLE
a

PROJECT

LOCATION

VICINITY MAP
N. T. S
4 4
4 1
o

TEMECULA
SAN JUAN CAPISTRANO y
0 9
s

OCEANSIDE O VISTA '
1CARLSBAD

ESCONDIDO
0 PROJECT
l
1ULIAN
8 LOCATION '
RAMONA
POWAY
O 67 9

LA MESA
1r SPRING VALLEY

SAN DIEGO
0 CHULAVISTA 4

IMPERIAL BEACH
I 5

LOCATION MAP
N. T. S.

NO. DESCRIPTION CITY DATE VID DATE 55075

APPROVED CHANGES I ENGINEER OF WORK RCE
3/ 20/ 24
06/ 30/ 2024
EXP. LIC. DATE DATE

CONTRACTOR' S NOTES

CONTRACTOR AGREES THAT IN ACCORDANCE WITH GENERALLY ACCEPTED

CONSTRUCTION PRACTICES, CONTRACTOR WILL BE REQUIRED TO ASSUME SOLE AND

COMPLETE RESPONSIBILITY FOR JOB SITE CONDITIONS DURING THE COURSE OF

CONSTRUCTION OF THE PROJECT, INCLUDING SAFETY OF ALL PERSONS AND PROPERTY; THAT THIS REQUIREMENT SHALL BE MADE TO APPLY CONTINUOUSLY AND

NOT BE LIMITED TO NORMAL WORKING HOURS, AND CONTRACTOR FURTHER AGREES

TO DEFEND, INDEMNIFY AND HOLD AGENCY HARMLESS FROM ANY AND ALL LIABILITY,

REAL OR ALLEGED, IN CONNECTION WITH THE PERFORMANCE OF WORK ON THIS

PROJECT, EXCEPTING LIABILITY ARISING FROM THE SOLE NEGLIGENCE OF THE AGENCY.

SURVEY INFORMATION

BASIS OF COORDINATES FOR THIS SURVEY IS THE NORTH AMERICAN DATUM OF 1983 ( NAD 83) CALIFORNIA STATE PLANE COORDINATE SYSTEM OF 1983 CCS83) ZONE 6 ( EPOCH 1991. 35) BASED LOCALLY UPON THE FOLLOWING CONTROL POINTS PER RECORD OF SURVEY 17271. "

STATION NORTHING EASTING
138 1989695. 30 6233260. 66
97 1992628. 34 6250181. 59
65 1990055. 13 6244077. 31
GRID BEARING BETWEEN # 138 AND # 97 = N 80' 09' 58" E.

VERTICAL CONTROL: ( NGVD29)

ELEVATIONS SHOWN HEREON AR IN TERMS OF THE NORTH GEODETIC VERTICAL DATUM OF 1929 ( NGVD29) BASED LOCALLY UPON THE FOLLOWING CONTROL POINT PER RECORD OF SURVEY 17271."

BENCH MARK ELEVATION
CP # 86 275. 08'

TOPOGRAPHY SOURCE

UNDER PREVIOUS DESIGN CONTRACT)

AGURRE AND ASSOCIATES
8265 COMMERICAL STREET SUITE 1
H
LA MESA, CA 91942
TOPO SOURCE METHOD ( I.E. ALTA, PHOTOGRAMMETRY , ETC.)
TOPO SOURCE DATE: MARCH 1 , 2013
0 L
QpFESSIpN
LO
r"
m
No, 55075
Exp, 06-30-24
9TFOF CA`
0 G 1. 0

BUENA SANITATION DISTRICT
IMPROVEMENTPLANSFOR: EMERGENCY MODIFICATIONS

BUENA OUTFALL FORCE MAIN, PHASE III

TITLE SHEET

APPR VED
55075

G MAYER RCE
BENCH MARK: DATUM:

SEE SHEET 1 OF 52 - TITLE SHEET
06/ 30/ 24
SHEET 1 OF52

EXPIRES DATE
DRAWING NO.
4505
06/24/2025
C10
169 of 352
H
L
L
H
NOTES:

CONTRACTOR TO INSTALL A REDUCER SPOOL AT THE
SPECIFIED MANHOLE LOCATIONS (*) WHERE THE THICKER
DR PIPE WILL BE UTILIZED.
z
Q
CL
O
CD

BUENA SANITATION DISTRICT
IMPROVEMENTPLANSFOR: EMERGENCY MODIFICATIONS

BUENA OUTFALL FORCE MAIN, PHASE III

SHEET LIST, CONSTRUCTION NOTES &
NO. DESCRIPTION CITY DATE VID

APPROVED CHANGES
DATE 55075 06/ 30/ 2024
ENGINEER OF WORK RCE EXP. LIC. DATE
3/ 20/ 24
DATE
e141 EQUIPMENT LIST
v
2f APPROVED
z
SEE TITLE SHEET 55075 06/ 30/ 24
No. 55075 GREG MAYER RCE EXPIRES DATE
Exp 06- 30-2
C
Q BENCH MARK: DATUM:
9T I V I
F
F CAS -CFO SEE SHEET 1 OF 52 - TITLE SHEET
SHEET 2 OF52
DRAWING N0.
4505
Sheet List Table
DWG No. SHT No. TITLE

GENERAL
1 G1. 0 TITLE SHEET
2 G1. 1 SHEET LIST, CONSTRUCTION NOTES &

EQUIPMENT LIST
CIVIL
3 C1. 0 CONSTRUCTION VICINITY MAP
4 C2. OA MANHOLE # 4
5 C2. 0B MANHOLE # 4
6 C3. OA MANHOLE # 7
7 C3. 0B MANHOLE # 7
8 C4. OA MANHOLE # 11
9 C4. 0B MANHOLE # 11
10 C5. OA MANHOLE # 13
11 C5. 0B MANHOLE # 13
12 C6. OA MANHOLE # 24
13 C6. OB MANHOLE # 24
14 C7. OA MANHOLE # 32 & # 34
15 C7. OB MANHOLE # 32
16 C7. 00 MANHOLE # 34
17 C8. OA ODOR CONTROL # 2
18 C8. OB ODOR CONTROL # 2
19 C9. OA ODOR CONTROL # 3
20 C9. OB ODOR CONTROL # 3

MECHANICAL
21 M1. OA DUAL ASSEMBLY DETAIL
22 M1. 0B AIR COMBO DETAIL NEAR MH# 34
23 M1. 00 3 INCH COMBO VALVE DETAIL

ALTERNATIVE)
24 M2. OA GRAVITY TO FORCE MAIN DETAIL
25 M2. 0B GRAVITY TO FORCE MAIN DETAIL

ALTERNATIVE I)
26 M2. 00 GRAVITY TO FORCEMAIN DETAIL

ALTERNATIVE II)
27 M3. 0 ODOR CONTROL SITE LOCATIONS
28 M3. 1A ODOR CONTROL UNIT 2 DETAIL
29 M3. 1B ODOR CONTROL UNIT 2 DETAIL II
30 M3. 3 ODOR CONTROL UNIT 3 DETAIL
31 M4. 0 STANDARD DETAILS I
32 M4. 1 STANDARD DETAILS II
34 M4. 2 STANDARD DETAILS III
35 M4. 3 STANDARD DETAILS IV
36 M4. 4 STANDARD DETAILS V
37 M4. 5 STANDARD DETAILS VI

ELECTRICAL
38 E0. 0 ELECTRICAL GENERAL NOTES
39 E0. 1 ELECTRICAL LEGEND & ABBREVIATIONS
40 E1. 0 SINGLE LINE DIAGRAM
40 E2. 0 POWER & CTRL ODOR# 2 PLAN
41 E3. 0 AREA CLASSIFICATION ODOR# 2 PLAN
42 E4. 0 ELEM CTRL DIAGRAM I
43 E5. 0 CONTROL PNL- 2A PLC LAYOUT
44 E5. 1 CP- 2A PLC EQUIP LIST
45 E5. 2 CP- 2A PLC PWR & PLC MOD I
46 E5. 3 CP- 2A PLC MOD II
47 E5. 4 CP- 2A PLC MOD III
48 E5. 5 CP- 2A PLC 10 DIAGRAM
49 E6. 0 ELECTRICAL DETAILS I
50 E6. 1 ELECTRICAL DETAILS II
P& ID
51 10.0 P& ID LEGEND & SYMBOLS
52 11.0 ODOR CONTROL UNIT 2 P& ID

CONSTRUCTION NOTES
NO. DESCRIPTION
1 INSTALL 1- 1/ 4" SCH 80 PVC PIPE ( WELDED).
2 INSTALL 2" PVC SCH 80 PIPE (WELDED).
3 INSTALL 2" 90° PVC SCH 80 HORIZONTAL ELBOW.
4 INSTALL 2" 900 PVC SCH 80 VERTICAL ELBOW,
5 INSTALL 3" SS FEMALE TEE.
6 INSTALL 2" U-TUBE PVC VENT DISCHARGE WITH MESH.
7 INSTALL 2" D-26 AIR COMBINATION VALVE PER DETAIL D ON SHEET M4. 4. 8 INSTALL 2" x 1-1/ 4" SCH 80 PVC REDUCER (WELDED).
9 INSTALL 3" PVC SCH 80 PIPE ( WELDED).
10 INSTALL 3" PVC SCH 80 TEE (WELDED).
11 INSTALL 3" PVC SCH 80 BALL VALVE ( WELDED).
12 INSTALL 3" x 2" PVC SCH 80 REDUCER ( WELDED).
13 INSTALL 4" PVC SCH 80 PIPE ( WELDED).
14 INSTALL 4" x 4" x 2" SCH 80 PVC TEE ( WELDED).
15 INSTALL 3" 900 PVC SCH 80 ELBOW.
16 INSTALL 4" x 3" PVC SCH 80 REDUCER ( WELDED).
17 INSTALL 4" PVC SCH 80 FLANGE.
18 INSTALL 4" PVC SCH 80 BALL VALVE.
19 INSTALL 4" PVC SCH 80 UNION ( WELDED),
20 INSTALL 4" 45° PVC SCH 80 VERTICAL ELBOW ( WELDED).
21 INSTALL 4" 900 PVC SCH 80 HORIZONTAL ELBOW,
22 INSTALL 3" C-26 AIR COMBINATION VALVE PER DETAIL D ON M4. 4. 23 INSTALL 4" SCH 80 PVC CAP TO EXISTING MANHOLE PENETRATION. 24 INSTALL 8" PVC SCH 80 PIPE ( WELDED).
25 INSTALL 8" PVC SCH 80 FLANGE.
26 INSTALL 8" PVC SCH 80 BALL VALVE ( WELDED).
27 INSTALL 8" PVC SCH 80 COUPLING ( WELDED).
28 INSTALL 8" 90° PVC SCH 80 VERTICAL ELBOW ( WELDED).
29 INSTALL 8" D- 26 AIR COMBINATION VALVE ( FLANGED PER DETAIL D ON SHEET M4. 4. 30 INSTALL 8" SCH 80 PVC CAP TO EXISTING MANHOLE PENETRATION. 31 INSTALL 4" 900 PVC SCH 80 VERTICAL ELBOW.
32 CUT AND INSTALL 4" DRAIN HOLE IN VAULT FILLED WITH GRAVEL. 33 INSTALL 9' x 9' x 8. 5' PRECAST CONCRETE VAULT.
34 INSTALL SS 316E LADDER IN VAULT.
35 CONTRACTOR TO SAW CUT AND REPLACECONCRETE FLOOR SLAB. 36 INSTALL DH071 E/ ONE EXTREME SERIES SIMPLEX GRINDER PUMP STATIONS PER DETAIL C ON SHEET M4. 4.
37 INSTALL 4" SCH 80 PVC TEE.
38 INSTALL 6'- 4" x 5'- 3" x 5' PRECASTCONCRETE VAULT.
39 REMOVE AND REPAIR EXISTING 4" PVC SCH 80 LINE AT 0. 5% GRADE. 40 INSTALL 2' X 2' X 4" CONCRETE PAD.
41 INSTALL 3'- 0" X 3' - 0" ( MIN, CLEAR OPENING) H- 20 RATED ALUMINUM DOUBLE

DOOR ACCESSHATCH METAL SAFETYGRAFTING PER BILCO, OR ENGINEER APRROVED EQUAL.
42 INSTALL 1- 1/ 4" 90° SCH 80 PVC VERTICAL ELBOW (WELDED). 43 INSTALL 1- 1/ 4" SCH 80 PVC TEE ( WELDED).
44 INSTALL REMOVABLE BOLLARD PER DETAIL A ON SHEET M4. 1. 45 CONNECT PROPOSED PVC PIPING TO EXISTING PASSIVE ODOR CONTROL DRUM SCRUBBER.
46 CONNECT PROPOSED PVC PIPING TO EXISTING 3" RETURN LINE (WELDED). 47 CONNECT PROPOSED PVC PIPING TO THE EXISTING FLANGE FITTING IN ODOR CONTROL BUILDING.
48 INSTALL 2" PVC SCH 80 UNION ( WELDED).
49 INSTALL 2" PVC SCH 80 HAYWARD CHECK VALVE W/ 0. 5 OPENING PRESSURE, OR ENGINEER APPROVED EQUAL PER DETAIL A ON SHEET M4. 3,
50 CONTRACTOR TO TRENCH AND RESTOREMEDIAN.
51 INSTALL ELECTROFUSION BONDED COUPLING BY ICONIX WATERWORKS OR ENGINEER APPROVED EQUAL PER DETAIL B ON SHEET M4. 3.
52 INSTALL SSVICTAULIC COUPLING STYLE908, OR ENGINEER APPROVED EQUAL PER DETAIL D ON SHEET M4. 3.
53 INSTALL SS24" BLIND FLANGE BY FERGUSON OR ENGINEER APPROVED EQUAL. 54 INSTALL 4" 450 PVC SCH 80 HORIZONTAL ELBOW ( WELDED). 55 CONTRACTOR TO RESTORE PAVEMENT PER DETAIL A & CON SHEET M4. 0. 56 INSTALL 3" PVC SCH 80 WYE WITH REMOVABLE CAP.
57 INSTALL THRUST BLOCK AND ANCHOR BLOCK PER DETAIL BON SHEET M4. 1. 58 REMOVE AND REPLACE MANHOLE CONE IF NECESSARY FOR PLACEMENT OF FITTINGS.
59 REMOVE AND REPLACE EXISTING 8" HDPE X PVC TRANSTIONAL COUPLING. 60 INSTALL 24" IPSX 6" IPS ELECTROFUSION BRANCH BAFFLE, ELOFIT OR ENGINEER APPROVED EQUAL PER DETAIL E ON SHEET M4. 3.
61 DEMO INDICATED MINIMUM DISTANCE BEYOND THE INLET AND OUTLET OF THE EXISTING MANHOLE.
62 CONTRACTOR TO DETERMINE SAW CUT DISTANCE TO ALLOW ROOM FOR INDICATED PIPE FITTINGS.
63 INSTALL PIPE PENETRATION PER DETAIL C ON SHEET M4. 1. 64 INSTALL PRESSURE TRANSMITTER AND PRESSURE SWITCH PER DETAIL EON SHEET M4. 1.
65 INSTALL SS VERTICAL PIPE WALL SUPPORT PER ATLAS KBS- V, OR APPROVED EQUAL PER DETAIL D ON SHEET M4. 2.
66 PROTECT SADDLE USING NO- OX- ID, ONLY IF THE SADDLE IS METALLIC. 67 INSTALL PIPE SUPPORT PER DETAIL C ON SHEET M4. 2.
68 INSTALL 3" PVC SCH 80 UNION ( WELDED).
69 INJECT HIGH STRENGTH CONCRETE TYPE 5, 4500 PSI, WATER CEMENT RATIO 0.45 TO THE INDICATED AREA.
70 CONTRACTOR TO REPLACE CONCRETE CURB, SIDEWALK, AND PAVEMENT PER DETAIL B ON SHEET M4. 2.
71 CONTRACTOR TO PAINT EXPOSED VAULT TAN COLOR TO MATCH GROUND. 72 INSTALL 24" HDPE 3' SPOOL WITH GROOVED ENDS.
73 INSTALL ELECTRO FUSION FLEX RESTRAINT BY ICONIX WATERWORKS OR ENGINEER APPROVED EQUAL PER DETAIL C ON SHEET M4. 3.
74 CONNECT PROPOSED PVC SCH 80 PIPING TO EXISTING 2" RETURN LINE. 75 REMOVE AND REPLACE EXISTING 4" HDPE X PVC TRANSTIONAL COUPLING. 76 INSTALL 8" 45° PVC SCH 80 HORIZONTAL ELBOW ( WELDED). 77 INSTALL 2" PVC SCH 80 TRUE UNION.
78 INSTALL 4" PVC SCH 80 TRUE UNION.
79 REMOVE AND REPLACEUPPER MANHOLE CONE SECTION PER DETIAL A ON SHEET M4. 2.
80 INSTALL 3" PVC SCH 80 LONG RADIUS PVC ELBOW.
81 INSTALL 3" SS 316E FEMALE TEE.
82 INSTALL TEMPORARY STEEL PLATE COVERS PER DETAIL D ON SHEET M4. 2. 83 INSTALL WELDOLET.
84 INSTALL 3" PVC SCH 80 SOCKET.
85 INSTALL 3" PVC SCH 80 TRUE UNION.
86 INSTALL 6" 90° HDPE VERTICAL ELBOW.
87 INSTALL 6" HDPE X PVC TRANSTIONAL COUPLING.
88 INSTALL 6" x3" SCH 80 PVC REDUCER ( WELDED).
89 INSTALL 3" PVC SCH 80 WITH REMOVABLE CAP.
90 INSTALL CUSTOM FABRICATED HDPE REDUCER WITH GROOVED ENDS.

EQUIPMENT LIST
N0. DESCRIPTION TAG ID MF' R MODEL # DETAILS QTY
1 COMBINATION AIR VALVE V- 01040 A. R. I. D-26 2" REINFORCEDE NYLON WASTEWATER COMBINATION AIR VALVE, 3" NPSM FEMALE CONNECTION
1 2 COMBINATION AIR VALVE A. R. I. D- 26 3" REINFORCED NYLON WASTEWATER COMBINATION AIR VALVE, 3"

NPDM MALE CONNECTION
11 3 COMBINATION AIR VALVE V- 01045 A. R. I. D- 26 8" STAINLESS STEEL WASTEWATER COMBINATION AIR VALVE, 8"

FLANGED CONNECTION
1 4 LEVEL PRESSURE TRANSDUCER PIT- 1051 SEE SHEET M4. 5. 1 5 GRINDER PUMP STATION PMP- 01001 E/ ONE DH071- 124 SEE SHEET M4. 4. 1 6 AIR VAC ENCLOSURE PLACER WATERWORKS PW/ SJARVS- 6 28" X 28" X 48" ABOVE GROUND AIR RELEASE VALVE ENCLOSURE WITH SS HINGES AND ANCHOR PLATES FOR 3" AIR COMBINATION VALVE
11 7 AIR VAC ENCLOSURE PIPELINE PRODUCTS VCAS- 1424 14" X 24" ABOVE GROUND AIR RELEASE VALVE POLYETHYLENE ENCLOSURE FOR 2" AIR COMBINATION VALV
1 8 INTAKE FAN M- 01001 GREENHECK AER- 20- 03- 0605- VG 1/4 HP, 115/ 60/ 1 SIDEWALL DIRECT DRIVE EXHAUST FAN 1 9 EXHAUST FAN M- 01002 GREENHECK CUE- 080- VG 1I10 HP, 115/ 6011 V/C/ P CENTRIFUGAL DIRECT DRIVE WALL

EXHUASTFAN
1 10 PRESSURE SWITCH PS- 1052 SEE SHEET M4. 5. 1

PIPE DIAMETER
MANHOLE RIM ELEVATION ( FT.) INVERT ELEVATION ( FT.) RIM TO INV. ( FT.) 4 94. 26 87. 88 6. 38
7 79. 15 72. 74 6. 41
11 112. 57 103. 58 8. 99
13 129. 54 120. 57 8. 97
15 143. 51 135. 81 7. 7
16 157. 96 144. 88 13. 08
17 173. 58 163. 9 9. 68
18 184. 52 174. 11 10, 41
19 190. 7 179. 72 10. 98
20 193. 07 181. 1 11. 97
20A 200. 11 189. 92 10. 19
21 219. 17 209. 53 9. 64
22 244. 66 233. 96 10. 7
23 255. 12 246. 19 8. 93
24 271. 74 263. 33 8. 41
25 289. 77 275. 92 13. 85
26 297. 06 287. 48 9. 58
27 305. 47 288. 8 16. 67
28 306. 38 290. 28 16. 1
29 299. 17 291. 68 7.49
30 276. 57 266. 44 10. 13
31 269. 58 256. 54 13. 04
32 278, 37 270. 62 7. 75

GENERAL CONSTRUCTION NOTES
N0. DESCRIPTION QTY
1 MODIFY EXISTING COMBINATION AIR VALVE ASSEMBLY WITH DUAL ASSEMBLY PER SHEET M1. OA.
3 2 MODIFY EXISTING COMBINATION AIR VALVE ASSEMBLY WITH A SINGLE COMBINATION AIR VALVE.
2 3 INSTALL NEW DUAL COMBINATION AIR VALVE PER SHEET M1. OA. 1 4 INSTALL NEW SINGLE COMBINATION AIR VALVE PER SHEET M1. 06. 1 5 MODIFY ODOR CONTROL UNIT # 2 PER SHEET M3. 1A & M3. 16. 1 6 MODIFY ODOR CONTROL UNIT # 3 PER SHEET M3. 2. 1
7 MODIFY EXISTING MANHOLES WITH 3' HDPE SPOOL AND APPURTENANCES PER SHEET M2. OA.
15 8 MODIFY EXISTING MANHOLE WITH HDPE TEE AND APPURTENANCES PER SHEET M2. 0B.
1 9 MODIFY EXISTING MANHOLES WITH HDPE REDUCER AND APPURTENANCES PERSHEET M2. 00.
4 PIPE DIMENSION RATING ( DR)

APPLICATION MANHOLE

DOWNSTREAM

DIAMETER ( IN) / DR

UPSTREAM DIAMETER

IN) / DR
4 24/ 11 24/ 11
7 24/ 11 24/ 11
13 24/ 11 24/ 11

CONVERSTION

TO FORCEMAIN
15 24/ 11 24/ 17
16 24/ 17 24/ 17
17 24/ 17 24/ 17
18 24/ 17 24/ 17
19 24/ 17 30/ 17
20 30/ 17 24/ 17
20A 24/ 17 24/ 17
21 24/ 17 24/ 17
22 24/ 17 24/ 17
23 24/ 17 24/ 17
24 24/ 17 24/ 17
25 24/ 17 24/ 17
26 24/ 17 30/ 17
27 30/ 17 30/ 17
28 30/ 17 30/ 17
29 30/ 17 26/ 11
30 26/ 11 26/ 11
31 26/ 11 26/ 11
32 26/ 11 26/ 11
33 26/ 11 26/ 11
34 24/ 11 24/ 11
06/24/2025
C10
170 of 352

CITY OF CARLSBAD NOTES

GENERALNOTES
1) THIS PLAN SUPERSEDES ALL OTHER PLANS PREVIOUSLY APPROVED BY THE CITY 12) A PRE - CONSTRUCTION MEETING SHALL BE HELD AT THE SITE PRIOR TO THE I8} ALL OFF SITE HAUL ROUTES SHALL BE SUBMITTED BY THE CONTRACTOR TO OF CARLSBAD REGARDING IMPROVEMENTS SHOWN ON THIS SET OF PLANS. BEGINNING OF WORK AND SHALL BE ATTENDED BY ALL REPRESENTATIVES THE CITY ENGINEER FOR APPROVAL TWO FULL WORKING DAYS PRIOR TO RESPONSIBLE FOR CONSTRUCTION INSPECTION SUPERVISION TESTING AND BEGINNING OF WORK. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ANY 2) APPROVAL OF THIS PLAN DOES NOT LESSEN OR WAIVE ANY PORTION OF THE ALL OTHER ASPECTS OF THE WORK. THE CONTRACTOR SHALL SCHEDULE THE DEBRIS OR DAMAGE OCCURRING ALONG THE HAUL ROUTE OR ADJACENT CARLSBAD MUNICIPAL CODE. RESOLUTION OF CONDITIONAL APPROVAL. CITY MEETING BY CALLING THE INSPECTION LINE AT ( 760) 438- 3891 AT LEAST FIVE ( 5) STREETS A5 A RESULT OF THE GRADING OPERATION.

STANDARDS OR OTHER ADDITIONAL DOCUMENTS LISTED HEREON AS THEY MAY WORKING DAYS PRIOR TO STARTING CONSTRUCTION. APPROVED DRAWINGS PERTAIN TO THIS PROJECT THE ENGINEER IN RESPONSIBLE CHARGE SHALL MUST BE AVAILABLE PRIOR TO SCHEDULING. 19) NO BLASTING SHALL BE PERMITTED -

REVISE THESE PLANS WHEN NON- CONFORMANCE IS DISCOVERED- 13) ALL INSPECTION REQUESTS OTHER THAN FOR PRE - CONSTRUCTION MEETING 20) THE EXISTENCE AND LOCATION OF UTILITY STRUCTURES AND FACILITIES 3) CITY APPROVAL OF PLANS DOES NOT RELIEVE THE DEVELOPER OR ENGINEER- OF- WILL BE MADE BY CALLING THE ENGINEERING 24 HOUR INSPECTION REQUEST SHOWN ON THE CONSTRUCTION PLANS WERE OBTAINED BY A SEARCH OF THE WORK FROM RESPONSIBILITY FOR THE CORRECTION OF ERRORS AND OMISSIONS LINE AT ( 760) 438- 3891. INSPECTION REQUESTS MUST BE RECEIVED PRIOR TO AVAILABLE RECORDS. ATTENTION IS CALLED TO THE POSSIBLE EXISTENCE OF DISCOVERED DURING CONSTRUCTION. ALL PLAN REVISIONS SHALL BE PROMPTLY 2: 00 P- M. ON THE DAY BEFORE THE INSPECTION IS NEEDED. INSPECTIONS WILL OTHER UTILITY FACILITIES OR STRUCTURES NOT SHOWN OR IN A LOCATION SUBMITTED TO THE CITY ENGINEER FOR APPROVAL. BE MADE THE NEXT WORK DAY UNLESS YOU REQUEST OTHERWISE. REQUESTS DIFFERENT FROM THAT SHOWN ON THE PLANS. THE CONTRACTOR IS MADE AFTER 2: 00 P. M- WILL BE SCHEDULED FOR TWO FULL WORK DAYS LATER- REQUIRED TO TAKE DUE PRECAUTIONARY MEASURES TO PROTECT THE 4) A RIGHT- OF- WAY PERMIT FROM THE CITY ENGINEER WILL BE REQUIRED FOR ANY UTILITIES SHOWN ON THE PLANS AND ANY OTTER EXISTING FACILITIES OR WORK iN THE PUBLIC RIGHT OF WAY- PRIOR TO PERMIT ISSUANCE, A CERTIFICATE 14) THE OWNER AND/ OR APPLICANT THROUGH THE DEVELOPER AND/ OR STRUCTURES NOT SHOWN.

OF INSURANCE MUST BE FILED NAMING THE CITY OF CARLSBAD AS AN ADDITIONAL CONTRACTOR SHALL DESIGN, CONSTRUCT AND MAINTAIN ALL SAFETY INSURED ON THE PERMITTEE' S POLICY IN THE MINIMUM AMOUNT DEVICES. INCLUDING SHORING, AND SHALL BE SOLELY RESPONSIBLE FOR 21) THE CONTRACTOR SHALL VERIFY THE LOCATION OF ALL EXISTING FACILITIES OF $ 1, 000, 000- 00 FOR EACH OCCURRENCE OF LIABILITY. THE INSURANCE CONFORMING TO ALL LOCAL, STATE AND FEDERAL SAFETY AND HEALTH ABOVEGROUND AND UNDERGROUND) WITHIN THE PROJECT SITE WITHIN A 30 COMPANY WRITING THE POLICY MUST HAVE A RATING OF " A-" OR BETTER AND A STANDARDS, LAWS AND REGULATIONS. DAY SCHEDULE AND AT LEAST 14 DAYS AHEAD OF CONSTRUCTION SIZE CATEGORY OF CLASS V OR BETTER AS ESTABLISHED BY " BESTS" KEY RATING OPERATIONS TO PERMIT THE REVISION OF THE CONSTRUCTION PLANS IF IT IS GUIDE. 15) THE CONTRACTOR SHALL CONFORM TO LABOR CODE SECTION 6705 BY FOUND THAT THE ACTUAL LOCATIONS ARE IN CONFLICT WITH THE PROPOSED SUBMITTING A DETAIL PLAN TO THE CITY ENGINEER ANDIOR CONCERNED WORK. 5) NO WORK SHALL BE COMMENCED UNTIL ALL PERMITS HAVE BEEN OBTAINED FROM AGENCY SHOWING THE DESIGN OF SHORING. BRACING SLOPE OR OTHER THE CITY AND OTHER APPROPRIATE AGENCIES. PROVISIONS TO BE MADE OF WORKER PROTECTION FROM THE HAZARD OF 22) THE CONTRACTOR SHALL NOTIFY AFFECTED UTILITY COMPANIES ( SEE BELOW) CAVING GROUND DURING THE EXCAVATION OF SUCH TRENCH OR TRENCHES AT LEAST TWO FULL WORKING DAYS PRIOR. TO STARTING CONSTRUCTION 6) REVISION OF THESE PLANS MAY BE REQUIRED IF THE PROPOSED IMPROVEMENTS OR DURING THE PIPE INSTALLATION THEREIN- THIS PLAN MUST BE PREPARED NEAR THEIR FACILITIES AND SHALL COORDINATE WORK WITH A COMPANY ARE NOT CONSTRUC- ED PRIOR TO THE DEADL. INE DATE OF THE IMPROVEMENT FOR ALL TRENCHES FIVE FEET { 5} OR MORE IN DEPTH AND APPROVED BY THE REPRESENTATIVE.

AGREEMENT. CITY ENGINEER AND/ OR CONCERNED AGENCY PRIOR TO EXCAVATION. IF THE PLAN VARIES FROM THE SHORING SYSTEM STANDARDS ESTABLISHED BY THE UNDERGROUND SERVICE ALERT ( 800) 422- 4133 7) NO REVISIONS WILL BE MADE TO THESE PLANS WITHOUT THE WRITTEN APPROVAL CONSTRUCTION SAFETY ORDERS TITLE 8 CALIFORNIA ADMINISTRATIVE CODES SDG& E ( 800) 660- 7343 OF THE CITY ENGINEER, NOTED WITHIN THE REVISION BLOCK. ON THE THE PLAN SHALL BE PREPARED BY A REGISTERED ENGINEER AT THE PACIFIC BFLL ( 800) 892- 0123 APPROPRIATE SHEET OF THE PLANS AND TITLE SHEET, CONTRACTOR' S EXPENSE. A COPY DF THE OSHA EXCAVATION PERMI T MUST BE TIME WARNER CABLE ( 760) 438- 7741 SUBMITTED TO THE INSPECTOR PRIOR TO EXCAVATION- COX COMMUNICATIONS ( 760) 806- 9809 8) ORIGINAL DRAWING SHALL BECOME THE PROPERTY OF THE CITY UPON BEING CITY OF CARLSBAD ( STREETS AND STORM DRAIN) ( 760) 434- 2980 SIGNED BY THE CITY ENGINEER. 16) IF ANY ARCHAEOLOGICAL RESOURCES ARE DISCOVERED WITHIN ANY WORT{ CITY OF CARLSBAD ( SEWER. WATER & RECLAIMED WATER) ( 760 ) 438- 2722 ZONE DURING CONSTRUCTION, OPERATIONS WILL CEASE IMMEDIATELY AND SAN DIEGUITO WATER DISTRICT ( 760) 633- 2650 9) THE ORIGINAL DRAWING SHALL BE REVISED TO REFLECT AS - BUILT CONDITIONS BY THE PERMITTEE WILL NOTIFY THE CITY ENGINEER. OPERATIONS WILL NOT LEUCAD[ A WASTEWATER DISTRICT ( 760) 753- 0155 THE ENGINEER - OF - WORK PRIOR TO FINAL ACCEPTANCE OF THE WORK BY THE RESTART UNTIL THE PERMITTEE HAS RECEIVED WRITTEN AUTHORITY FROM VALLECITOS WATER DISTRICT ( 760) 744- 0460 CITY. THE CITY ENGINEER TO DO SO. OLIVENHAIN WATER DISTRICT ( 760) 753- 6466 BUENA SANITATION DISTRICT ( 760) 726- 1340
10) ACCESS FOR FIRE AND OTHER EMERGENCY VEHICLES SHALL BE 17) ALL OPERATIONS CONDUCTED ON THE SITE OR ADJACENT THERETO WHICH KINDER MORGAN ( 619) 279- 1251 MAINTAINED] TO THE PROJECT SITE AT ALL TIMES DURING CONSTRUCTION. IMPACTS TRAFFIC. INCLUDING WARMING UP, REPAIR, ARRIVAL. DEPARTURE OR

OPERATION OF TRUCKS, EARTHMOVING EQUIPMENT, CONSTRUCTION 11) WHERE TRENCHES ARE WITHIN CITY EASEMENTS. A SOILS REPORT COMPRISED EQUIPMENT AND ANY OTHER ASSOCIATED GRADING EQUIPMENT SHALL BE OF: SUMMARY SHEET ( B) LABORATORY WORK SHEETS AND ( C) COMPACTION LIMITED TO THE PERIOD BETWEEN 9: 00 P. M. AND 6: 00 A. M. EACH DAY, MONDAY PRELIMINARY TRAFFIC CONTROL

CURVES, SHALL BE SUBMITTED BY A PROFESSIONAL ENGINEER OF THE STATE OF THRU FRIDAY AND NO EARTHMOVING OR GRADING OPERATIONS SHALL BE CALIFORNIA, PRINCIPALLY DOING BUSINESS IN THE FIELD OF APPLIED SOILS CONDUCTED ON WEEKENDS OR HOLIDAYS. WORK WHICH HAS NO IMPACT ON SEE SPECIFICATIONS APPENDIX L FOR FULL REFERENCE- MECHANICS- THE SOILS REPORT WILL BE SUBMITTED TO THE CITY ENGINEERING TRAFFIC MAY COMMENCE NO EARLIER THAN 6: 00 PM. ( A LIST OF CITY OF CONTRACTOR SHALL BE RESPONSIBLE FOR SUBMITTAL AND FINAL INSPECTOR WITHIN TWO WORKING DAYS OF CONIPLETION OF FIELD TESTS. THE CARLSBAD HOLIDAYS IS AVAILABLE AT THE ENGINEERING DEPARTMENT ACCEPTANCE OF TRAFFIC CONTROL PLAN.

WRITTEN FIELD COMPACTION REPORT( S) SHALT. BE IMMEDIATELY SUBMITTED TO COUNTER.) 24" FORCEMAIN

OPEN - CUT TRENCH
g
C-- 8
U
LU
Uj
N a-
C
tr r
to
O
T

U U , LN
LLl W
Q 0
CK
0 35
n.
u
G l
5 -

PALOMARAIRPORTROAD-
2 4
I it
4 4iCV
1 2
O
c-
3 c- 4

L ODOR CONTROL
fol. m SITE # 1
I '
Know what's below.

Call beforeyoudig.
lottec — 6/ 28/ 2016 4 36: 47 PQ -. Saved — 6/ 27/ 20' 6 10: 42: 52 AN :: N: \ PR0J\ 838/ Currer. t Submittal\ Oeaign\ gan\ 838-- G- 62.dwy :: kector. Robledo 10 u
Cq 11
PALO14ARR1gpO
RTr tiAt) 12
KEY
MAP LEGEND30"
124" GRAVITYSEWER OPEN -

CUT TRENCHINDEX

TO DRAWINGSSHT
DWG DESCRIPTION1
G- 1 TITLE SHEE' r 2
G- 2 CITY OF CARLSBADNOTES, KEY MAP AND INDEX TO DRAWINGS 3 G- 3 SEWER, CONST. NOTES LEGEND, SEQ. OF CONST- AND SIGNING AND STRIPINGNOTES 4
G- 4 GENERAL ABBREVIATIONS, LEGENDS AND SYMBOLS5
C- 1 PASEO DEL NORTEBUENA OUTFALL AND VALLECITOSOUTFALL CONNECTION6
C- 2 PASEO DEL NORTESTA 10+ 00 TO 20+ 00 7
C- 3 PASEO DEL NORTESTA 20+ 00 TO 22+ 00, PALOMARAIRPORT ROAD STA 22+ 00 TO STA 30+ 00 8
C- 4 PAL- OMARAIRPORTROAD STA 30+ 00 TO STA 40+ 00 9
C- 5 PALOMAR AIRPORT ROAD STA 40{• 00 TO STA 50+ 00 10
0- 6 PALOMARAIRPORT ROAD STA 50+ 00 TO STA 60+ 00 11
C- 7 PALOMARAIRPORT ROAD STA 60+ 00 TO STA 70+ 00 12
C- 8 PALOMARAIRPORT ROAD STA 70+ 00 TO STA 80+ 00 13
C- 9 PALOMARAIRPORT ROAD STA 80+ 00 TO STA 90+ 00 14
C- 10 PALOMARAIRPORT ROAD STA 90+ 00 TO STA 100+ 00 15
C- 11 PALOMARAIRPORT ROAD STA 100+ 00 TO STA 110+ 00 16 C- 12 PALOMARAIRPORT ROAD STA 110+ 00 TO STA 120+ 00 17 C- 13 PALOMARAIRPORT ROAD STA 120+ 00 TO STA 130+ 00 18 C- 14 PALOMARAIRPORT ROAD STA 130+ 00 TO STA 140+ 00 19 C- 15 PALOMARAIRPORT ROAD STA 140+ 00 TO STA 150+ 00 20 C- 16 PALOMARAIRPORT ROAD STA 150+ 00 TO STA 160+ 00 21 C- 17 PALOMARAIRPORT ROAD STA 160+ 00 TO STA 169+ 00 22 C- 18 PALOMARAIRPORT ROAD STA 169+ 00 TO STA 179+ 00 23 C- 19 PALOMARAIRPORT ROAD STA 179+ 00 TO STA 189+ 00 24 C- 20 PALOMARAIRPORT ROAD STA 189+ 00 TO STA 196+ 00 25 C- 21 PALOMAR AIRPORT ROAD STA 196+ 00 TO STA 201+ 95 26 C- 22 CIVIL DETAILS 27
C- 23 MECHANICALDETAILS 28
S- 1 STRUCTURALNOTES & ABBREVIATIONS29
S- 2 ODOR CONTROLYARD & SITE PLANS 30
S- 3 ODOR CONTROLENCLOSURE FOUNDATION AND ROOF FRAMING
PLAN 31
S- 4 ODOR CONTROLENCLOSURE ELEVATION AND SECTIONS
32 S- 5 DIVERSIONSTRUCTURE PLANS AND SECTIONSVALLECITOS AND BUENAOUTFALL CONNECTION33
S- 6 DETAILS 34
S- 7 STRUCTURALSTANDARD DETAILS - 1 35
S- 8 STRUCTURALSTANDARD DETAILS - 2 36
E- 1 ELECTRICALNOTES AND ABBREVIATIONS37
E- 2 ODOR CONTROLSITE # 1 ELECTRICALSITE PLAN 38
E- 3 ODOR CONTROLSITE # 2 ELECTRICALSITE PLAN 39
E- 4 SINGLE LINE DIAGRAMSAND PANEL SCHEDULESODOR
CONTROLSITE #
3 24
r
g
z 2;.
aAi ODOR
7 23 0

CONTROL
SITE P
13 Q #
2 7
00}
7 22 C
15 17
20 Coll C-
13 ---- e- j4- -- r' -'
21 14Efl

PALOMAR
OAKS WAY - - El 18D
16 7
1 9

CONSULTANT
AT
LEE & RO, Inc. San
Diego, Californi DESCRIPTION
UTY DATE AD DATA SCALE HORIZONTAL:
1 APPROVED
CHANGES I VERTICAL: NONE 26"

FORCEMAINOPEN -
CUT TRENCH32
31 30 ,
c:,
47ail,140th &'rREEr REFERENCE
DRAWINGS SET=

SPECIFICATIONSAPPENDIX A FORFULL REFERENCE - KEY
MAP DWG INDEX 0
MH #
1 GMH #
13 25 MH # 25 2
1 MH #2 GMH #
14 26 MH # 26 3
MH # 3 15 MH # 15 27 MH # 27 4
MH # 4 16 MH # 16 28 MH # 28 5
MH # 5 17 MH # 17 29 MH # 29 6
MH # 6 18 MH # 18 30 MH # 30 MH #
7 19 MH # 19 31 MH # 31 78
1S JMH #8 2[] MH # 20 32 MH # 32 t
9 ]] MH # 9 GMH #
21 G
MH #
33 10
MH # 10 22 MH # 22 34 MH # 34 11
MH - 411 23 MH # 23 35 MH NO. V1- V3 12
MH # 12 24 MH # 24 36 MH NO. B1- B3 FLOW

DIVERSIONSTRUCTURE WEST
CONNECTIONTO 1)
BUENAOUTFALL 2)

VALECITOSOUTFALL EAST

CONNECTIONAT ( E) BUENAOUTFALL FORCEMAIN
26"

FORCEMAINTRENCHLESS
ti
3 34 r
4 o
G'
p
L 29
6 9 33
G-
2 BUENA

SANITATIONDISTRICT MPROVEMENT
PLANS FOR: BUENA

OUTFALL FORCE MAIN, PHASE III CITY

OF CARLSBADNOTES KEY
MAP AND INDEX TO DRAWINGSjq-
ot,`
No
C.

I. P. NO. 8131 tiAPPROVEDM'

SEE TITLE SHEET HEFT
2 OF 39 DISTRICTENGINEER RCE EXPIRES' BENCH
MARK: SLt SHEFT'I OA7i1h1: I15G5 DRAWNG N0. CDP
14- 06 COC DWG N0. 485- 5 4505 x
CD
Cf)
w
W
W
0 U
LL
a
J
W
W

GENERAL
CONSTRUCTIONNOTES NO.

DESCRIPTIONQTY 1

MODIFYEXISTING COMBINATIONAIR VALVEASSEMBLYWITH DUAL ASSEMBLY PER SHEETM1. 0A. 3
2 MODIFYEXISTING COMBINATIONAIR VALVEASSEMBLYWITH A SINGLECOMBINATION AIR VALVE. 2
3 INSTALLNEW DUAL COMBINATIONAIR VALVEPER SHEETM1. 0A. 1 4 INSTALLNEW SINGLECOMBINATIONAIR VALVEPER SHEETM1. 0B. 1 5 MODIFYODOR CONTROLUNIT # 2 PERSHEETM3. 1A & M3. 1B. 1 6 MODIFYODOR CONTROLUNIT # 3 PERSHEETM3. 2. 1 7

MODIFYEXISTINGMANHOLESWITH T HDPESPOOLAND APPURTENANCESPER SHEETM2. OA. 11
8 MODIFYEXISTINGMANHOLEWITH HDPE TEE ANDAPPURTENANCESPER SHEET M2. 06. 1
9 MODIFYEXISTING MANHOLES WITH HDPE REDUCERAND APPURTENANCESPER SHEETM2. 00. 4
NnTF_
q- 1.

FOR EXISTING3" AIRCOMBINATIONVALVES, REUSE IN OTHERPROPOSED LOCATIONS. 2.

FOR EXISTING2" AIRCOMBINATIONVALVES, SALVAGE TO THECITY. 3.

REUSEEXISTING24" BLINDFLANGESAT MANHOLE #7 ANDMANHOLE32.

SALVAGEOTHER EXISTINGBLIND FLANGESTO THECITY. 1`
0 w
H
06/24/2025
C10
171 of 352
110
100
TIN
70 30+ 00
MANHOLE # 4
c 4 .,
U o 0
c;
0 U7Ld
c
y)
RIGHT OF WAY cnv
Q 4
log
31+ 00

PROPOSED DUAL

ASSEMBLY
5: 17: 52 PM :: N: \ PROJ\ 838\ Current
32+ 00 33+ 00 34+ 00 35+ 00 36+ 00 37+ 00 38+ 00 39+ 00 F

PALOMAR
M

IRI ORT RD
X. ELEC 1, 2 E TRAFFIC-
gym_.: ._, _ .., ,
ON
dwg :: Hector. Robledo
116
a
An+ nn
oiv
r ,.....
z,
Lo
ado
lm
x
I„:

CONSULTANT
ANTLEE & RO, Inc.

San Diego, California
NO. DESCRIPTION CiTr DATE VID DATE SCALE
HORIZONTAL: 1"= 40'
APPROVED CHANGES VERTICAL: 1"= B'

EXISTING COMBINATION AIR VALVE - PROPOSED DUAL ASSEMBLY

PLAN VIEW
SCALE: NTS
110
100

IIIIIIII&OX

IIIIIIIIIIIIIWI
A BU ILTj

CONSTRUCTION NOTES

OEXCAVATE,

BACKFILL AND COMPACT PIPE TRENCH
PER COV STD DWG SWR- 11 AND SWR- 12.
2O

RESURFACE AC PAVEMENT PER COV STD DWG
GS- 26 AND GS- 28. WHEN THE LOCATION OF THE

TRENCH CROSSES A LANE WIDTH, BOTH LANES
FOR A LENGTH OF 20' AHEAD AND 20' BEHIND THE
CROSSING POINT SHALL BE PAVED FULL WIDTH.

OINSTALL24" 0DR11HDPE4710 (IPS) FORCEMAINWITH HEAT FUSED JOINTS. 18 INSTALL 6- FT 0 MANHOLE SIM TO COV STD DWG
SWR- 04, SWR- 07, SWR- 28, SWR- 29 AND SWR- 30B.
25 INSTALL HEAT FUSED HDPE TEE FITTING W/ 24" PJ

BRANCH FOR FLG ADAPTED FORCEMAIN OUTLET

INCLUDING BACKING RINGS, INTERNAL STIFFENER

PLATES, AND ALL HARDWARE/ APPURTENANCES
INCLUDING 24" x 6" 0 REDUCING FLANGE. PER
DETAIL 1/ C- 23.
26 PROVIDE 3" 0 SEWAGE COMBINATION AIR VALVE
A. R. I. D- 023, OR EQUAL) WITH VENTED MH COVER.

DISPOSITION NOTES
70 1 PROTECT IN PLACE.
2 POTHOLE EXIST CROSSING UTILITIES AND
REPORT FINDINGS TO ENGINEER AT LEAST 14
DAYS PRIOR TO TRENCH EXCAVATION.

IIIIIIIIIIIII01
40+ 00
Lo
U
r
LLJ
40+00 p LLI
is o U)
o Lu
d Z
VELOCITY ( FT/ S) d/ D
NO. CDWP FWWP DWq7lw77p
3 3. 52 8. 13 p1

PIPELINE DATA

NUMBER RADIUS LENGTH

LINE/ CHORD

DIRE TI N
1-5 109. 18 N87' 49' 47. 28" E
C4 2279. 00 172. 38 N89' 59' 48. 28" E
L6 1133. 42 S87° 50' 10. 72" E
Q N
U
7 E
O
E E
40' 0l 40' 80'
SCALE. 1" = 40' C- 4 ccn
LLJ
Z

BUENA SANITATION DISTRICT IL-'
J-
LIJ
IMPROVEMENT PLANS FOR: n

BUENA OUTFALL FORCE MAIN, PHASE III

OPALOMAR AIRPORT ROAD
STA 30+ 00 TO STA 40+ 00
U
pRpFESS/N
LO
FZ
C. I. P. NO. 8131). LL
2 APPROVED O
No. C7 807 G' m SEE 11TLE SHEET
HEET 8 OF 39DISTRICT ENGINEER RCE EXPIRES DATE
sT9 C i V lF
BENCH MARK: SEE SHEET 1 DATUM: USGS DRANING N0.

LLJ
CFCAL\Fp CDP 14- 06, COC DWG NO. 485- 5 4505
1/ 1TrA-

1. LOCATION OF DUAL COMBINATION ASSEMBLY SHALL BE ON
THE CENTER MEDIAN UNLESS OTHERWISE SPECIFIED.

2. INSTALL BOLLARDS AROUND DUAL COMBINATION AIR VALVES.

3. CONTRACTOR SHALL TEMPORARILY REMOVE AND RESTORE

ANY CONFLICTING IRRIGATION SYSTEM IN THE CENTER
MEDIAN.

W
06/24/2025
C10
172 of 352
A
ai# Sit*
AO
a' . s 49.
w
IL
h*
1RY
Y

CENTER MEDIAN
k
Ll
T--
MANHOLE # 4

PROPOSED LOCATION
TREE/
LANDSCAPINGFmiL
PROPOSED DUAL= ,

ASSEMBLY
r -
4 r + 1
x lm"
1 F
MANHOLE # 4
0 L

AERIAL VIEW GROUND VIEW
SCALE: NTS SCALE: NTS
z
Q
CL

EXISTING COMBINATION AIR VALVE - PROPOSED DUAL ASSEMBLY 0 0
C2. OB

BUENA SANITATION DISTRICT
IMPROVEMENTPLANSFOR: EMERGENCY MODIFICATIONS

BUENA OUTFALL FORCE MAIN, PHASE III
Q
oFEDoNgl
MANHOLE # 4

APPROVED
SEE TITLE SHEET 55075 06/ 30/ 24
SHEET 5 OF52
No, 55075 GREG MAYER RCE EXPIRES DATE
yt Exp, 06-30-2 r
3/ 20/ 24 `
BENCH MARK: DATUM: DRAWING NO.

NO. DESCRIPTION CITY DATE viD DATE 55075 06/ 30/ 2024 9 IVI F
F CAS -CFO SEE SHEET 1 OF 52 — TITLE SHEET 4505
APPROVED CHANGES ENGINEER OF WORK RCE EXP. LIC. DATE DATE 06/24/2025
C10
173 of 352
70 50
40 Z 5 WCL
o
fL
a
fig-- w
0 W Wq H_ c)of ca0W o q>
N 0)
J
MANHOLE 1 FT ¢ W W z
EXIST GRADE r>~ ram+.

CC'
w DEEPER THAN p
W q OVER OF W W
H — BID PLANS_ — m
PIPELINE_
Wo
AS
cn
o N
0co0
Jm
a
j w —
i
m
o W " C VW w OUWx "
Cl :E cs- 5 2
co S-
0_0253El33
LID
W v r— 5= 0. 0047U
n1 Z q
cr
CO ( O h + co
to
t + U
W
a O 1
r
OD
N Cv
co V
0 ( 0 (, N LO >
O
O
O CA

W I OW O
t
Iti. h UN
ti + CV a W C~DIWWa^ ti +
CV
pOj N LO f7
00 0L0 N
W o UJO
W row - j WW c~
nW n Ci0 0 (: ¢
o Coo
t C6rn(0 a) 000 p
c.> co nW Ww O W to
Z S=-

0. 00135= 0. 02531- 0 CO0 Nt` F— LO ti r`
cn N N Cn
MLU (
T > w — ¢-- w— E— F_ 00
O
Z Q
QJ C CnCo
W
W > 11 ao
w g W
IL Cn LL Ciup
J
2 W =
II C~ nu co
N U 3
m Coo a tYWco w
i-
N
a- i Q rn
0 N rn
o
co LO
to
CO
W Cn L)
I¢- `O co
W I¢-
i w
U_ W N
0 N
Cq 05

INSTALL
24" HDPEDR11 PE4710 BUTT FUSED FORCEMAINU
u O mW
oO to

LO PROFILE SCALES LO
D_
D' W SCALE: HORIZ 1"= 40' VERT
1"= 8' 50+
00 51+ 00 52+ 00 53+ 00 54+ 00 55+ 00 56+ 00 EX.

TEL Ow
r ..
18" RCP 1 2 s
PL&

2. ' RCP 1 2' q EX.

ELEC APN ,? 1
2 Ek.

Ids, RW # II : EK. Gets ", 4• , Ev Lam _
CAN — C
R--- _ -- =77-
T - -- - G - _
T - W _
LO
50+00Q N .. W _€tT
l W -
N - N -_ - W L Nl _-__. W U = _ _ - _ -
C5
51+ 00 I 52+ 00 53+ 00 A+ nn 56+ 00 Lll
Lu
Ry %
MH # 6 STA5 64 I I 04 rn
18 25 N N „' _. -- - - 18
25 26 O
LLJ R' J " L
t F.: - - TM t• --- - -- - R V - - - RW - W - 2 " — — rn Q
ht'
i ----- RW ---- rj RW - RW RW ----- i'`( - 57+
00 58+ 00 59+ 00 60+ 00 MANHOLE #
7 7-
7 r $.

EX.

ELEC o EX C& C X.
72' RCP 1 2 d l MH #
T !* 57+ 59 06 / H\
61 - -- RW -- Inv
F-
J
Z .
r o EX. CUR EX.

C& C II Q ` - ---
t lJ..- EX 30' DIP RW 4 -- ---- -.
iN -- --- h ---- - ._ Vy. Vy. WW. W.. W W z— I
i
l: /- 4
x; "
APN
211-
040= 33 . a C
R RD
j PALOMA T
A hRPO24' DIP SS';%: 3• a
dry.'
Know
what'
s below. Callberore
ym dig. ted — 6/
18/ 20194: 15: 55 PIN PROPOSEDSINGLE
ASSEMBLY 4H #
8 STA159+09.00 18251W T - w

O W RW - ---- O
U) o EX.

C&
C06 o
M N coS — --
5—
in r-
o
s----
ems -
s - -
VCP SS
APN. 21 040-= 66 — EX." 30"
YCPSS x N
A
S
B U I C T] CONSTRUCTIONNOTES "

OEXCAVATE, BACKFILL
AND

COMPACT PIPE TRENCH PER COV
STD DWG SWR- 11 AND SWR-12. ORESURFACEAC

PAVEMENT
PER COV STD DWG GS- 26
ANDGS-28. WHENTHE LOCATIONOF THE TRENCHCROSSES
A LANE WIDTH, BOTH LANES 90 FOR
A
LENGTHOF20' AHEADAND29 BEHINDTHECROSSINGPOINT
SHALL BE PAVED FULLWIDTH. OINSTALL24"
O
DR11HDPE4710 ( IPS) FORCEMAINWITH HEAT
FUSED JOINTS. 18 INSTALL
6- FT 0 ARMOROCKPOLYMERCONCRETE 80 MANHOLE
SIM TO COV STDDWG SWR- 04, SWR- D7, SWR- 28,
SWR- 29 AND SWR-30B. 25 INSTALL
HEAT FUSED HDPE TEE FITTINGW/ 24" 01 BRANCHFOR

FLG ADAPTEDFORCEMAINOUTLET INCLUDING BACKING

RINGS, INTERNAL STIFFENERPLATES, AND
ALL HARDWARE/APPURTENANCES70 INCLUDING
24" x 6" 0 REDUCINGFLANGE. PER DETAIL 1/
C- 23. 26 PROVIDE
3" 01 SEWAGECOMBINATIONAIR VALVE A. R.

I. D- 023, OREQUAL) WITH VENTED MH COVER. 60 DISPOSITION NOTES 1 PROTECT
IN PLACE. POTHOLEEXIST

CROSSING UTILITIES AND REPORT FINDINGSTO
ENGINEER AT LEAST 14 DAYS PRIOR50 TO
TRENCH EXCAVATION. 40 VELOCITY (
FT/
S) d/ D NO. CDWP
FWWP CDWP FWWP 3 3.
52 8. 13 1 1 tNOTE: 0

1. AR/
ARV COMBINATIONVALVE LOCATION TO BE DETERMINED.

PIPELINEDATA

NUMBER RADIUS

LENGTH LINEICHORD DIRECTION
C5
2221.
00 869. 66 N80° 56' 46. 46" E L7 430.
01 N69° 43' 43. 64" E 0z V
w J 10
U) = U
H
LLI

CONFORMED SET
08/ 2018 CONSULTANTe., OfESS,
0Q VERTICAL
ALIGNMENTREVISION 04/ 2019 R. LOAF L4 LEE &
RO, Inc. W ND.

C7 8 San Diepo.

California # NO. DESCRIPTION
CITY DATE ND DATE SCALE HORIZONTAL: 1"=
40' NSF v1
o
e

APPROVED

CHANGES
VERTICAL: 1-= 8' ° F CAS
Saved — 6/
15/ 20194: 15: 19 PM :: V:\ PROJ\ 838\Current Submittal \Design\ civil\ 838— CO6. dwg :: Boyana.Angelova EXISTING COMBINATION

AIR VALVE - PROPOSEDSINGLE ASSEMBLY PLAN VIEW
SCALE: NTS
O L
O
U
40,
0'
40, 80' 1 SCALE. •
1" =
40 C- 6 n W Z
BUENA

SANITATION
DISTRICT w IMPROVEMENT
PLANS
FOR: n BUENA OUTFALL

FORCE MAIN, PHASE III O PALOMAR
AIRPORTROAD STA 50+
00 TO STA60+ 00 U C. I.

P. NO. 8131LL APPROVED O

SEE TITLE

SHEETDISTRICTENGINEER
RCE EXPIRES DATE HEET 10
OF 39 J BENCH MARK:

SEE SHEET 1 DAIUM: USGS DRAWINGNO. 4505 W
W
i
CDP
14-06, COC DWG NO. 485- 5 AInTGC- 1.

LOCATION

OF SINGLE COMBINATIONASSEMBLYSHALL BE ON THE CENTER
MEDIANUNLESS OTHERWISESPECIFIED. 2. INSTALL
BOLLARDSAROUND SINGLE COMBINATIONAIR VALVES. 3. CONTRACTOR

SHALL TEMPORARILY REMOVEAND RESTORE ANY CONFLICTING
IRRIGATIONSYSTEM IN THE CENTERMEDIAN. RIGHT OF
WAY SIM 1`
0 W
z
Q
CL
0 7­
1 06/24/2025
C10
174 of 352
db

PROPOSED LOCATION

7. ova
L
dal i
MANHOLE # 7 --

TREE/ LANDSCAPING

PROPOSED SINGLE ASSEMBLY
u -
ram_
s

4._
MANHOLE # 7 CENTER MEDIAN z
brLL—

AERIAL VIEW GROUND VIEW V)
SCALE: NTS SCALE: NTS ~
V)
z
Q
CL

EXISTING COMBINATION AIR VALVE - PROPOSED SINGLE ASSEMBLY 0 0
C3. 0B

BUENA SANITATION DISTRICT
IMPROVEMENTPLANSFOR: EMERGENCY MODIFICATIONS

BUENA OUTFALL FORCE MAIN, PHASE III
Q
oFEDNq MANHOLE # 7

APPROVED
SEE TITLE SHEET 55075 06/ 30/ 24
No, 55075 GREG MAYER RCE EXPIRES DATE
SHEET 7 OE52
Exp. 06-30-2
3/ 20/ 24
JET
BENCH MARK: DATUM: DRAWING N0.

NO. DESCRIPTION CITY DATE viD DATE 55075 06/ 30/ 2024 9 I V I F
F CAS -CFO SEE SHEET 1 OF 52 — TITLE SHEET 4505
APPROVED CHANGES ENGINEER OF WORK RCE EXP. LIC. DATE DATE 06/24/2025
C10
175 of 352
NOTES:

CONSTRUCTION NOTES 1. LOCATION OF DUAL COMBINATION ASSEMBLY SHALL BE ON THE CENTER MEDIAN UNLESS OTHERWISE SPECIFIED.
0 EXCAVATE, BACKFILL AND COMPACT PIPE TRENCH 2. INSTALL BOLLARDS AROUND DUAL COMBINATION AIR VALVES.

PER COV STD DWG SWR- 11 AND SWR- 12.

3. CONTRACTOR SHALL TEMPORARILY REMOVE AND RESTORE

0. O

RESURFACE AC PAVEMENT PERCOVSTDDWG
ANY CONFLICTING IRRIGATION SYSTEM IN THE CENTER MEDIAN. Al Lq GS- 26 AND GS- 28. WHEN THE LOCATION OF THE 120 120 TRENCH CROSSES A LANE WIDTH, BOTH LANES
FOR A LENGTH OF 20' AHEAD AND 20' BEHIND THE
CROSSING POINT SHALL BE PAVED FULL WIDTH. 2,4
O
INSTALL 24" 0 DR11 HDPE 4710 ( IPS) FORCEMAIN
WITH HEAT FUSED JOINTS.
110 110 18 INSTALL 6- FT 0 ARMOROCK POLYMER CONCRETE
MANHOLE SIM TO COV STD DWG SWR- 04, SWR- 07,
SWR- 28, SWR- 29 AND SWR- 30B.
25 INSTALL HEAT FUSED HDPE TEE FITTING W/ 24" 0

BRANCH FOR FLG ADAPTED FORCEMAIN OUTLET

INCLUDING BACKING RINGS, INTERNAL STIFFENER
100 100 PLATES, AND ALL HARDWARE/ APPURTENANCES
INCLUDING 24" x 6" 0 REDUCING FLANGE. PER
Ci
DETAIL 1/ C- 23.
26 PROVIDE 3" 0 SEWAGE COMBINATION AIR VALVE
90 90 (
A. R. I. D- 023, OR EQUAL) WITH VENTED MH COVER.
ui
Ln

DISPOSITION NOTES
80 80
1 PROTECT IN PLACE.
2 POTHOLE EXIST CROSSING UTILITIES AND REPORT
FINDINGS TO ENGINEER AT LEAST 14 DAYS PRIOR
TO TRENCH EXCAVATION.
70 70
80+ 00 81+ 00 82+ 00 83+ 00 84+ 00 85+ 00 86+ 00 87+ 00 88+ 00 89+ 00 90+ 00 L T
MANHOLE # 11
t
1- 135x:
a 12

2. cP <1Y ' y04 30
O
O
25 18
1 2 -
00 — -
W- — - -- 1-- - - ---- - - -- - - --- -
O
O_ - _ = _ - _ ---- - —_ --- -- --- _ ---- ---- - ----- -- - - _ - _ O W - — .. _- 31+ 00
W .. - g 00 C7 83+ 00i + + + © " + - - - - - trt - - - - + 90+00 O W LLB80+ 00 u7__ ___ 1 6 r`
N z RIGHT OF WAY
Rw
E 8" RYY ' MH 10 STA 84 0 II r i of
18 25 -
Qg 5.-_ — S - g — s --- 5 -- S S— N-- S---- S-- ---- 5 S-- —-- 5 -- oS 0--
5---- S—
S-- —
s _ — s —— ---- — - S--- — s— _ 5-- _ — S —_ S__—_..-.-- s—= — Rs---.— Z
to LLI
x.. e EaY > 6 DIP S t _. -- - EX. CABLE. _ `
0 40' 0' 40' 80'
M Y _ . - kFiv- 2i2- 040- 1d \ „ s - - -- X. 21 VLP SS c _ _ , in 1 1
AI
APN 212- 04 - 64 _ „` - - C 9
fi EX. 30 VCP -
CALF
z
Ld
T
40 fn

BUENA SANITATION DISTRICT
LLl
IMPROVEMENT PLANS FOR: / J

BUENA OUTFALL FORCE MAIN, PHASE III Z
PALOMAR AIRPORT ROAD 0
Q
CONFORMED SET 08/ 2018 CONSULTANT STA 80+ 00 TO STA 90+ 00 U QRpFE55/
0 VERTICAL ALIGNMENT REVISION 09/ 2019 °
P. LOF9 C. I. P. NO. 8131 LI_
L LEE & RO, Inc. y8071, z
AIR°° o CL
No. C7 m
SEE 11TLE SHEET
HEET 13 OF 39
San Diego, Califomia
a

DISTRICT ENGINEER RCE EXPIRES DATE J
Knowwhat's below.

Call Y++ .

HORIZONTAL: 1 "= 40' * sr9 C / V \ -*
BENCH MARK: SEE SHEET 1 DATUM: USGS DRAWING N0.

NO. DESCRIPTION CITY DATE MD DATE SCALE
rFof capF°
APPROVED CHANGES VERTICAL: 1"= 8' CDP 14- 06, COC DWG NO. 485- 5 4505 J O Plotted - 9/ 6/ 2019 11: 04: 23 AM :: Saved - 9/ 6/ 2019 10: 55: 54 AM :: V:\ PROJ\ 838\ Current Submittal\ Design\ civil\ 838- CO9.dwg :: Boyano. Angelova O

PROPOSED DUAL
ASSEMBLY C4. OA

EXISTING COMBINATION AIR VALVE - PROPOSED DUAL ASSEMBLY

BUENA SANITATION DISTRICT
PLAN VIEW IMPROVEMENTPLANSFOR: EMERGENCY MODIFICATIONS
SCALE: NTS

BUENA OUTFALL FORCE MAIN, PHASE III
QoFESSIONq MANHOLE # 11
M4
c APPROVED
SEE TITLE SHEET 55075 06/ 30/ 24
SHEET 8 OF52
No, 55075 GREG MAYER RCE EXPIRES DATE
3/ 20/ 24 *
Exp, 06- 30-2
s Q BENCH MARK: DATUM: DRAWING N0.

NO. DESCRIPTION CITY DATE VID DATE 55075 06/ 30/ 2024 9T C7V 4505F F CA IFO SEE SHEET 1 OF 52 - TITLE SHEET
APPROVED CHANGES ENGINEER OF WORK RCE EXP. LIC. DATE DATE I- z
N
N
o EXIST GRADE

OVER OF
MANHOLE 2 FT w
o DEEPER THAN W
o

PIPELINE AS - BID PLANS
o v w
o
MANHOLE 2. 5 FT s= o. 0033 S=- OA033
b

DEEPER THAN W
00 AS - BID PLANS
o W
O S= 0. 0155
Cl)
W
c O ZW
W 3
q CO
t MON q V q
d.

V: q M > Q
O O
N
W W

N O M T W
O W Sf t` M o` rN V O o0000 > W rn
O
00 W W U
z
a) M .},
m W
MO W a
0( nC J M W
W W W
w EOM ¢ Ll. Q
O`'
ai ao: W3 000 Urn u~il i
n>. w
I— W jor
VELOCITY ( FT/ S) d/ D
NO. CDWP FWWP CDWP FWWP
3 3. 52 8. 13 1 1

PIPELINE DATA

NUMBER RADIUS LENGTH

LINE/ CHORD

DIRECTION
L8 355. 51 S81 ° 02' 08. 01 " E
C7 2329. 00 108. 34 S79° 40' 23. 19" E
L9 1326. 63 S78° 20' 25. 69" E
06/24/2025
C10
176 of 352
MANHOLE # 11

PROPOSED DUAL

ASSEMBLY
i
01 .

AERIAL VIEW
SCALE: NTS
1 p
R
a

CENTER MEDIAN

PROPOSED LOCATION
I"
lz
I/
Cali WtIOILsale Fla
Hour
Fitness

EXISTING COMBINATION AIR VALVE - PROPOSED DUAL ASSEMBLY MANHOLE # 11

GROUND VIEW
SCALE: NTS
ry
z
I
W
V)
V)
z
Q
n
0 0
06/24/2025
C10
177 of 352
NOTES:

CONSTRUCTION NOTES 1. LOCATION OF DUAL COMBINATION ASSEMBLY SHALL BE ON THE CENTER MEDIAN UNLESS OTHERWISE SPECIFIED.

O
EXCAVATE, BACKFILL AND COMPACT PIPE TRENCH 2. INSTALL BOLLARDS AROUND DUAL COMBINATION AIR VALVES.

PER COV STD DWG SWR- 11 AND SWR- 12.

3. CONTRACTOR SHALL TEMPORARILY REMOVE AND RESTORE
2O

RESURFACE AC PAVEMENT PER COV STD DWG
ANY CONFLICTING IRRIGATION SYSTEM IN THE CENTER MEDIAN. GS- 26 AND GS- 28. WHEN THE LOCATION OF THE

TRENCH CROSSES A LANE WIDTH, BOTH LANES
140 140 GROSSING POINT

FOR A LENGTH
FSHALLBE PAVED OFULLHWIDTH.

IND E

OINSTALL
24" 0 DR11 HOPE 4710 ( IPS) FORCEMAIN
WITH HEAT FUSED JOINTS.
18 INSTALL 6- FT 0 ARMOROCK POLYMER CONCRETE
13030
MANHOLE SIM TO COV STD DWG SWR- 04, SWR- 07,
SWR- 28, SWR- 29 AND SWR- 30B.
25 INSTALL HEAT FUSED HOPE TEE FITTING W/ 24" 0

BRANCH FOR FLG ADAPTED FORCEMAIN OUTLET

INCLUDING BACKING RINGS, INTERNAL STIFFENER
OVER qOF
PIPELINE 00 PLATES, ANDALL HARDWARE/ APPURTENANCES
120
0)
04120 INCLUDING 24" x 6" 0 REDUCING FLANGE. PER
DETAIL VC- 23.
38 PROVIDE 2" 0 SEWAGE COMBINATION AIR VALVE
A. R. 1. D- 025, OR EQUAL) W/ VENTED MH COVER.
110 110

DISPOSITION NOTES
1 PROTECT IN PLACE.
100

POTHOLE EXIST CROSSING UTILITIES AND
100 REPORT FINDINGS TO ENGINEER AT LEAST 14
DAYS PRIOR TO TRENCH EXCAVATION.
90 90
100+ 00 101+ 00 102+ 00 103+ 00 104+ 00 105+ 00 106+ 00 107+ 00 108+ 00 109+ 00 110+ 00

AS BUILT
C011I H SONS MANHOLE # 13
j Ex-' 36" CMP ABAN f
ei
w r REMOVE CONFLICT PO.
a

AND DISPOSE AT CIT
5 ' 2 {
w —
i
1 Ex. i - vim 1 2 n m
r
1 2
g —
1 05+ 0 O +
04+ 0 `
O - - - - - = _ ,- . lL. _ -- r - 7+ _`-
o
Oy - .===
109+00 a0
103+ 0 _ _ 1 6 i . 110+00 N
Oy „ m 1 MLI #13ST 108+ p — ram--" _
r-
i j' — — I
of V5
2 " _ RIGHT OF WAY
O W
O
f W,
y 1 — EX 1 EX W Oy —
I O
W 0
O `'
o - __
F- f _ -,-= v
CURB— -- — --
SOFj S -- S
0 0 z LIJ
k . ,
s ,
rp0 o 4 S
V
c
Oy --- " s-
t f
y
M^ Q-
LL

S - - - - - - - - - -
E)hy - _
ZI

77. LLIY Z -
r-, _ . _ - --
Ata ' `_-",,, _----
r
a , F.. • a. $ --._ gym _
a _ - 1
a

A UTFALL
SCALE: 1 490' - U7
I--
Lu

BUENA SANITATION DISTRICT
Lu
IMPROVEMENT PLANS FOR: n V J

BUENA OUTFALL FORCE MAIN, PHASE III
O
z

PALOMAR AIRPORT ROAD Q
CONFORMED SET 08/ 2018 CONSULTANT STA 100+ 00 TO STA 110+ 00 U
OFESS/pN
0 VERTICAL ALIGNMENT REVISION 09/ 2019 .

LOVFFZc APPROVED
C. I. P. NO. 8131
O CLAFLEE & RO ILAnc. No. C7 807' m SEE TITLE SHEET
CqL A HEET 15 OF 39
San DiegoIft1w, California # * DISTRICT ENGINEER RCE EXPIRES DATE KnowwhaYsbe OW.
s P BENCH MARK: SEE SHEET 1 DA7UM: USGS LI- I
NO• DESCRIPTION aTY oA wo DAB HOR ONTAL: 1"= 40' T9r6 I V DRAWING NO.

Call !>Eforeya, dig.

SCALE F of CAI. \ ° 4505 J OAPPROVED CHANGES VER CAL: 1"= 8' CDP 14- 06, COC DWG NO. 485- 5 Plotted — 9/ 6/ 2019 1: 35: 44 PM :: Saved — 9/ 6/ 2019 1: 25: 07 PM :: V:\ PROJ\ 838\ Current Submittal\ Design\ civil\ 838— Cit. dwg :: Boyana. Angelova O

PROPOSED DUAL

ASSEMBLY
C5. OA

EXISTING COMBINATION AIR VALVE - PROPOSED DUAL ASSEMBLY

BUENA SANITATION DISTRICT

PLAN VIEW
SCALE: NI IMPROVEMENTPLANSFOR: EMERGENCY MODIFICATIONS

BUENA OUTFALL FORCE MAIN, PHASE III
QoFESSIONq MANHOLE # 13
M4

APPROVED
SEE TITLE SHEET 55075 06/ 30/ 24
SHEET 10 OF52
No, 55075 GREG MAYER RCE EXPIRES DATE
Exp, 06-30- 2
3/ 20/ 24 BENCH MARK: DATUM: DRAWING NO.

NO. DESCRIPTION i ICITY
DATE VID DATE 55075 06/ 30/ 2024 4505F
F CA IFO SEE SHEET 1 OF 52 — TITLE SHEET
APPROVED CHANGES ENGINEER OF WORK RCE EXP. LIC. DATE DATE 2 oWMANHOLE2 FT

DEEPER THAN
AS - BID PLANS m o
w
i
Al0

EXIST GRADE
rn 3
0 a
U NU om
I- oco
U
O W 0., U OD O pO wm_ wwCn V — O W
O
oz
5=0.0185 pip W I
m M
Q S=0.0093 U
wW
coo
o
Q
aoo N mLJ1 W W
COO
O
O M Od1 O
t
Uo 0o
0a?
U
o
mW
00 W
n- W V) rn°
F000
W
II w
INSTALL 24" HDPE DR11 PE4710 BUTT FUSED FORCEMAIN

PROFILE SCALES
SCALE: HORIZ 1 "= 40'
VERT 1"=8a
VELOCITY ( FT/ S) d/ D
NO. CDWP FWWP CDWP FWWP
3 3. 52 8. 13 1 1

PIPELINE DATA

NUMBER RADIUS LENGTH LINE/ CHORD

DIRECTION
CS 2029. 00 1069. 31 S63° 14' 33. 68" E
L10 389. 02 S48° 08' 41. 67" E
06/24/2025
C10
178 of 352

TREE/ LANSCAPING
MANHOLE # 7

AERIAL VIEW
SCALE: NTS

PROPOSED

LOCATION

PROPOSED DUAL

ASSEMBLY

EXISTING COMBINATION AIR VALVE - PROPOSED DUAL ASSEMBLY f` CAITCm

GROUND VIEW
SCALE: NTS
MANHOLE # 7
z
L
z
Q
n
06/24/2025
C10
179 of 352
MH# 24
STA 157+ 75. 00
RIM EL= 271. 74
0z
U
o 175.7LF@S=00247

EXIST GRADE '
r
00 ,` ) OVER q OF
N N PIPELINE — ' v
14 w N f
cj co (6
co S=00459 m
N M
W W
ov
O+
371.OLF@
co
mu+ mco
orn
r
N
NUJ
cM
N LJJ
00 N U w
N
w

C) EXIST
GRADE w v 13 a U
OVER
q OFC
i PIPELINE
O W O
U) o LoW
co Z
pg22 0rn m o(
D o c6J
N
Qn NNv) Q
12 Q 0492
o 0m
m m M f1915
F@S
r
N N N rn
W o+ W 11

INSTALL
24" HDPEDR17 PE4710 BUTT FUSED GRAVITY PIPELINE PROFILE SCALES SCALE:

HORIZ 1"= 40' I
VERT
1"= 8' NEW

DUAL COMBINATIONAIR VALVEASSEMBLYPLAN
VIEW SCALE:

NTS VELOCITY (
FT/ S) d/ D NO.

CDWP FWWP CDWP FWWP 11

11. 49 14. 41 0. 310. 4812

12. 50 15. 72 0. 290. 4513

11. 21 14. 04 0. 310. 4914
j 8. 96 11. 09 0. 370. 60 PIPELINE

DATA LIN /

HO D NUMBER

RADIUS LENGTH DIRECTION
L13
1539. 60 N42° 00' 35. 04" E NOTES:

LOCATION

OF DUALCOMBINATIONASSEMBLY SHALL BE ON THE CENTER
MEDIAN UNLESS OTHERWISESPECIFIED. INSTALL
BOLLARDSAROUND DUAL COMBINATIONAIR VALVES. CONTRACTOR

SHALL TEMPORARILYREMOVE AND RESTOREANY
CONFLICTINGIRRIGATION SYSTEM IN THECENTERMEDIAN. MANHOLE # 24 RIGHT
OF WAYry
z
I
W
V)
V)
z
Q
n
06/24/2025
C10
180 of 352
MANHOLE # 24

AERIAL VIEW
SCALE: NTS

TREE/ LANDSCAPING

PROPOSED DUAL

ASSEMBLY

NEW DUAL COMBINATION AIR VALVE ASSEMBLY
MANHOLE # 24

GROUND VIEW
SCALE: NTS
n rp 1Trn nn^ n^ nrn
0 L
z
Q
I
CL
0 0
06/24/2025
C10
181 of 352
0161
290
280
270
260
250

RIGHT OF WAY
m wmft below.

CB11bdm repdig.

So d - 7/ 17/ 2020 4; 1& 22 FIM t-
196+ 00 197+ 00 198+ 00 199+ 00 200+ 00 201+ 00 202+ 00 MANHOLE # 32
k'( t4BLE

ODNFORYEA SET

VERTICAL ALIGNMENT REVISION

DESCRIPTION

PLAN VIEW
SCALE: NTS

CONSTRUCTION NOTES
1 EXCAVATE, BACKFILL AND COMPACT PIPE TRENCF
PER COV STD DWG SWR- 11 AND SWR- 12,
02 RESURFACE AC PAVEMENT PER COV STD DWG
GS-26 AND GS-28. WHEN THE LOCATION OF THE

TRENCH CROSSES A LANE W DTH, BOTH LANES
300 FOR A LENGTH OF 20' AHEAD AND 20' BEHIND THE
CROSSING POWT SHALL BE PAVED FULL WIDTH.

INSTALL 24- 0 DR11 HDPE 4710 (IPS) FORCEMAIN
WITH HEAT FUSED JOINTS.
290 INSTALL 26" 0 DR 11 HDPE 4710 ( IPS) FORCEMAINWITH
HEAT FUSED JOINTS. 15
INSTALL40" 0 DIAMETERCONTINUOUSWELDED STL
CASINGPIPE WITH 518" MIN. WALLTHICKNESS. INSTALL
BY THESORE, JACK ANO/ OR TUNNEL260
METHOD.
270
260
Ftifl
MANHOLE #
34 EXISTINGEASEMENTS: EASEMENT
FOR SLOPE & CONSTRUCTIONREC.
711511992ASDOC. NO. 1992-0443332D. R. a 40•
o' 40,
80,
SCALE: f" — 40' vwso+
e SEWEREASEMENT
REC. 713V1964
AT FILFJPAGE NO. 130512 O.

R. AND 1115/ 1965AT FiLE1PAGENO. 1287 D•
R. I ] SLOPEANDCONSTRUCTION
EASEMENTREC. 711WIMAS DOC. NO.
1992- 044331O. R. f OUTILITYEASEMENTREC,
7/
29/ 1975 ASINST. NO.75.0197623O, R. 0 SEWER EASEMENTREC, 41191, M AS DOC• NO. 2002.0331D24O. R. DISPOSITIONNOTESi l

PROTECT IN
PLACE, POTHOLEEXIST CRQSSfNGUTILITIES

AND REPORTFINIDMOS TO ENGINEER
AT LEAST 14 DAYS PRIORTO TRENCH
EXCAVATION. PROVIDETEMPORARYORANGE CONSTRUCTION

FENCING AROUND LIMITS OF
WORK AS DETERMINEDBY CONTRACTOR. COMPLY

WITH SITECONSTRAINT RUQUMEMENTSSTATED
ON DWG G- 3. CONSULTANT
Aff LEE & RO,
Inc.

San0" o, Collfomlo
0TV 1 GATEMD
dA1C HORIZONTAL- I - V S I VERTICAL: 1 ".
8' ALTERNATIVE1 P- 1B
INSTALL e•
FT
0 ARMOROCKPOLYMERCONCRETEMANHOLESIM TO COV
STD DWGSWR-D4, SWR-07, SWR- 28, SM- 29
AND SWR-308. INSTALLHEATFUSEDHDPE
TEE FITTINGW124" 0 BRANCHFOR FLG ADAPTED

FORCEMAINOUTLETINCLUDINGBACKING RINGS, INTERNAL
STIFFENER PLATES. AND ALL HARDWAREIAPPURTENANCES
INCLUDING24" x 6"
0 REDUCINGFLANGE, PERDETAIL110- 23. 0
PROVIDET' 0
SEWAGECOMBINATIONAIRVALVEA. R. I. D-
1123, OREQUAL) WITHVENTEDMH COVER. 27 SAWCUT, REMOVEAND

REPLACECONCRETECURB AND GUTTER IN - KIND
TO NEAREST CJ PER SDRSDG- 2 AND G-

11. 28SAVVCUT, REMOVEAND

REPLACECONCRETESIDEWALKIN - KIND TO
NEAREST CJ PER SDRSDG- 7, G- 9 AND4-

11. 3ORESTOREALLPORTIONS

OF IMPACTED LANDSCAPING, SHRUBBERY & IRRIGATIONTO
OWG1NAL CONDITION, AS ACCEPTED
BY CM. INTERCONNECTTO EXIST13UENA

OUTFALL FORCEMAININCLUDINGSHUTDOWNAND
CONNECTION TO EXIST 24"
0 WYEBRANCHOUTLET. CONTRACTORSHALLPOTHOLE

AND VERIFY LOCATIONOF TIE-
IN AND 24" x 10' FLG ECCENTRICREDUCERAND 18"

BLIND FLG PLUGVALVEPER EXISTRECORD
OVVG D- 3530. WITH ENGINEERPRIORTO EXCAVATION
OF RECEIVINGPIT. CONTRACTORSHALLREPORT

AND CONFIRM EXISTINGWYE FITTING, PRESSURE
RATING AND FLG COMPATIBILITY. 37 INSTALL
2- 24"
0 HOPE 45" VERTICALBENDFITTINGWITHHEAT FUSEDJOINTS,

PIPELINEDATA UMBER RADIUS
LENGTH 08
4C17 201, 27
1 N68°
23' 28,08"E 79,32 47.27
N51'23' 28, 02" E L10 482.86 Nab"
23' 02, 2D" E L20 10. 72 N9°
5T 0& 39" W C- 21 BUENASANITATION DISTRICTIMMOVEMENT

PLANTS FOR- BUENA

CUTI- ALL FORCE

MAIN, PHASE III PALOMAR AIRPORT ROAD STA
195+ 00 TO
STA 201+ 95 C. I. P. NO.
8131125OF BENCHHARK,

SEESHEET
I CAnAtVS0IMERNa CDP 14-
06, COC
DWG NO. 485- 5 4505 i- Ld X!] d
LILT
LY
0 LL_
Z
a
XJ
U)
0 LEI
z
Ld
I_
LLI
I
CL
0 0
J
Ld
J
NOTES:

1. 2.

3. 4.

LOCATION
OF
SINGLE

COMBINATION
ASSEMBLY AT MANHOLE 32 SHALL BE ON
THECENTERMEDIANUNLESSOTHERWISESPECIFIED. INSTALL BOLLARDSAROUND

COMBINATION
AIR VALVE AT MANHOLE # 32. CONTRACTORSHALL

TEMPORARILYREMOVE

AND RESTOREANY CONFLICTINGIRRIGATIONSYSTEM
IN THE CENTER MEDIAN. LOCATIONOF SINGLE COMBINATION
ASSEMBLY AT MANHOLE 34 SHALL BE ON
THEGROUNDWITHCONCRETEPAD. ON z z LL_
LLI
z
z
z
z
z
n
06/24/2025
C10
182 of 352

TREE/ LANSCAPING
K A A A 11 I / 11 r 1Ln n

AERIAL VIEW
SCALE: NTS

EXISTING COMBINATION AIR VALVE - PROPOSED DUAL ASSEMBLY

GROUND VIEW
SCALE: NTS
MANHOLE # 32
06/24/2025
C10
183 of 352
MANHOLE # 34

AERIAL VIEW
SCALE: NTS

NEW SINGLE COMBINATION AIR VALVE ASSEMBLY
r .. - • r
f,
ivy++y
s.. , + r.'. '
4 • «
t + '
tii '!' '
M
x.... • ' .

T - - p s r :# t - a ! k ra • y. + 4 ^ r .. i- r

GROUND VIEW
SCALE: NTS
a
L
z
Q
n
06/24/2025
C10
184 of 352
170
160
150
140
130
120
o 0 orn
N J
f
w

EXIST GRADE
OVER qOF MANHOLE 2. 58 FT f

PIPELINE
DEEPER THAN 0.
r
r
A5- BID PLANS
1 ti

0. r a
r
fl3S2
P 0.

T O C6
U
II
04- J f r r -
O 51
U
o WQ 1 — — o W
WE
o
CN W
r
cf7 W
r Z Z
J r 596.7 LFQ S=D015 J Q J
J
0) U
rn ¢ ¢
u- co
U co
ra y;
Ncq
O Lu
1 INSTALL 24" HDPE DR17 PE4710 BUTT FUSED GRAVITY PIPELINE

PROFILE SCALES
SCALE: HORIZ 1"= 40'
VERT 1"=81
120+ 00 121+ 00 122+ 00 123+ 00 124+ 00 125+ 00
0 cS a '
N -` c
Co 2
i STA
20 EX ELEC
EX. CABLE
0 40' 0' 40' 80'
Know what' s below. SCALE. 1" = 40'
C211beforeyoudig.

Plotted - 9/ 6/ 2019 12: 22: 05 PM :: Soved - 9/ 6/ 2019 12: 20: 20 PM :: VAPR0J% 638\ Cur IRS
EX. TEI
X. 30' VCP SS

3. dwg :: Boyana. Angelow

EXISTING ODOR CONTROL
UNIT # 2
126+ 00
17 28 `
39 5TA125+ .
50 127+ 00

EXISTING

EASEMENT
128+ 00 129+ 00 130+ 00

AS BU I L T
r I;: I•: ?. :. s 3
APN 212- 097_- 42
J ;
21 o T t s
30 32 -` ooCfR CQROL SITE S- 2
Imo. Y 1- 2
27 14 127+ 00128. 00
T
A iiiiiiiiiiiiiiimT1
m 1 11
own
f.
0 I
1 rtimi 1 i - v or w
aS i J
MANHOLE # 16

CONFORMED SET CONSULTANT
a VERTICAL ALIGNMENT REVISION 0912019
L LEE & R4, Inc.

San DTagn. California
N0. DESCRIPTION Orr nA7E qo pA1E SCALE
HORIZONTAL: V- 40'
APPROVED CHANGES VERTICAL- 1"= 8'

PLAN VIEW
SCALE: NTS

CONSTRUCTION NOTES

EXCAVATE, BACKFILL AND COMPACT PIPE TRENCH
PER COV STD DWG SWR- 11 AND SWR- 12.

ORESURFACE

AG PAVEMENT PER COV STD DWG
GS- 26 AND GS- 28. WHEN THE LOCATION OF THE

TRENCH CROSSES A LANE WIDTH, BOTH LANES
170
FOR A LENGTH OF 20' AHEAD AND 20' BEHIND THE
CROSSING POINT SHALL BE PAVED FULL WIDTH.

INSTALL 24" O DR17 HDPE 4710 ( IPS} GRAVITY

SEWER PIPELINE WITH HEAT FUSED JOINTS
14 INSTALL 8" 0 FLEXIBLE COUPLING AND FLANGED
160
FRP FA DUCT ( EXPOSED). INSTALL RESTRAINED
TRANSITION COUPLING FOR BURIED SCH 80 PVC

PIPING PER ALPHA BY ROMAC, OR APPROVED
EQUAL.
17 INSTALL 1" 0 K- COPPER RECYCLED WATER
SERVICE CONNECTION WITH NEW 314" METER PER
150 CMWD STD DWG NO. W- 3, W- 8 AND W- 9.

CONTRACTOR SHALL APPLY FOR NEW CMWD
RECYCLED WATER SERVICE.
20 INSTALL 5- FT 0 PRESSURE ARMOROCK POLYMER

CONCRETE MANHOLE SHAFT AND PRESSURE
140
PLATE ( 36") WITHOUT REDUCER PER SPPWC
DETAIL 329- 2 ( WITHOUT STEPS).
27 SAWCUT, REMOVE AND REPLACE CONCRETE CURB

AND GUTTER IN - KIND TO NEAREST CJ PER SDRSD
G- 2 AND G- 11.
130 28 SAWCUT, REMOVE AND REPLACE CONCRETE
SIDEWALK IN - KIND TO NEAREST CJ PER SDRSD G- 7
G- 9 AND G- 11.
30 RESTORE ALL PORTIONS OF IMPACTED

LANDSCAPING, SHRUBBERY & IRRIGATION TO
120
ORIGINAL CONDITION, AS ACCEPTED BY CM.
32 INSTALL I- BOx 5000 2 STAGE ACTIVE ODOR

CONTROL BIO- REACTOR BY INTEGRITY MUNICIPAL
SYSTEMS. PROVIDE CMU BLOCK ENCLOSURE AND
SDG& E ELECTRICAL SERVICE METER.
39 INSTALL 8" 0 FUSED HDPF LATERAL PROVIDE MJ
ADAPTER COUPLING FOR TRANSITION TO 8" SDR 3:

PVC PIPELINE.

DISPOSITION NOTES
z PROTECTINPLACE.
z

POTHOLE EXIST CROSSING UTILITIES AND
REPORT FINDINGS TO ENGINEER AT LEAST 14
DAYS PRIOR TO TRENCH EXCAVATION.

VELOCITY ( FTIS) d/ D
NO. CDWP FWWP CDWP FWWP
4 7. 50 9. 09 0. 42 0. 71
5 1 13, 13 0. 33 0. 52
Li-
0 U
C- 13 ccn
W
z

BUENA SANITATION DISTRICT H
LIJ
IMPROVEMENT PLANS FOR: a_

BUENA OUTFALL FORCE MAIN, PHASE III

OPALOMAR AIRPORT ROAD
U
E&Sr STA 120+ 00 TO STA 130+ 00
R.

Lp107
4 Fy
C. I. P. NO. 8131 LJ-
y
APPROVECNo.C7 m SEE TITLE SHEET
HEFT 17 OF 39r a

DISTRICT ENGINEER RCE EXPIRES DATE
BENCH MARK: SEE SHEET 1 DATUM. USGS WplylyG Nf7.

W
9T
WCDP 14- 06, COC DWG Na. 485- 5 4505
J

PIPELINE DATA

NUMBER RADIU H
G O

DIRECTION
C9 1971. 00 i3T2. 93 S68` 06' 00. 17" E
L11 1133, 32 S88° 03' 18. 66" E

1. CONTRACTOR TO CONFIRM ELEVATIONS OF LATERAL CONNECTIONS AND EXISTING UTILITIES PRIOR TO CONSTRUCTION.

2. STAY WITHIN EXISTING EASEMENTS FOR CONSTRUCTION.

RIGHT OF WAY
z
z
V J
z
Q
CD
CD
7­ 1
06/24/2025
C10
185 of 352
PIP

LAMP POST
a
y 7
1 MANHOLE # 16

ODOR CONTROL UNIT

AERIAL VIEW
SCALE: NTS
MANHOLE # 16

LAMP POST

GROUND VIEW
SCALE: NTS
0 L
06/24/2025
C10
186 of 352
320
310
300
U
aWn
290 Z
H
280 15
270
0 o
C5 Q ti
169+ 00
297.5 LF Q 8T0. 0037
m
11 Q FXIST GRADENCD
Lu
OVER q OF

F PIPELINE
o
00 cat~
m.
ft
En
375.0 LF @ S=0.0037'117T
N 47
LO6 voice
INN NN
Cj) W 06u
INSTALL 30" HDPE DR17 PE4710 BUTT FUSED GRAVITY PIPELINE

PROFILE SCALES
SCALE: HORIZ 1"i
I VERT 1"= 8°
J
w
Lim < nN
r
1 Q + W
Q LL
cn` t
O p U
U U
LLJ
c) Wa
O
Z
o I—
N QtiW Qlmi
a + r
CO (
6 17 S= 007
N U criN U N U N
w m Lu
N
Lu ce) W w v w co
ON] N
c* f
o
ff'
yr
0 0
o N
Qph ¢ ani
co
j N
mw
oM j ry
ww
u i;'- 6, (
6 ll
Il N 5; IEN
EL [ Y ' Ii rY uu
d 0' LLl
INSTALL 26" 0 HDPE DR11 PE4710 BUTT FUSED FORCEMAIN
170+ 00 171+ 00 172+ 00 173+ 00 174+ 00 175+ 00 176+ 00

ODOR CONTROL
UNIT # 3
177+ 00
s •-
1 a . a
a•
Ir
I
f. i. ems: ra..S• ^:
i i_. . ra,-...,-+
r- ;
iv -
r—- _{,. o- S ' •= n:. .`.`
oil
11 1 9 1 - --- - ix.

Iwo --- Tea -
NOW
CURR
EX. GAS
0© h
r`
4F
FIX7
1 IN,
ET
r •-.'
Ili- o, rl e+• f l !<
r"//
rE - Irlrrr.„ Tit
wrIr
N' L ••.,, 9 c
rv..1 .
1 .
e . r n.:• cl .-• liL` 1 - j MREoEr-
Knowwrlafs below.

Callbeforeyoudig.

Plotted - 6/ 26/ 2020 3: 09: 59 PM :: Saved - 3: 09: 28 PM :: vc\ PROD\ 838iiiii ni Su Boyano. Angelova MANHOLE # 29
F
178+ 00
Y"
1 2 I 29C
I
179+ 00
AS 0U IIT
T
U
C) W
X
k 0 = `- E= 179+ DO r
L,
CONFORMED SET 08/ 1 CONSULTANT
Q VERTICAL ALIGNMENT REVISION 0612020
AT LEE & RO, Inc.

San Diego. California
N0. DESCRIPTION CITY
DATE-7 ND DATE SCALE
HORIZONTAL: 1"= 40'
APPROVED CHANGES VERTICAL 1"- 8•
E

CONSTRUCTION ' NOTES
0 EXCAVATE, BACKFILL AND COMPACT PIPE TRENCH
PER COV STD DWG SWR- 11 AND SWR- 12.

RESURFACE AC PAVEMENT PER COV STD DWG
V GS-26ANDGS-28. WHENTHELOCATIONOFTHE

TRENCH CROSSES A LANE WIDTH, BOTH LANES
320 FOR A LENGTH OF 20' AHEAD AND 20' BEHIND THE
CROSSING POINT SHALL BE PAVED FULL WIDTH.

INSTALL 30" 0 DR17 HDPE 4710 ( IPS) GRAVITY
SEWER PIPELINE WITH HEAT FUSED JOINTS.
310 J
INSTALL 26" 0 DR11 HDPE 4710 ( IPS) FORCEMAIN
WITH HEAT FUSED JOINTS.
10 INSTALL 4" 0 SCH 80 PVC SEWER PIPELINE W/

SOLVENT WELD JOINTS AND ALL REQUIRED
FITTINGS.
300 13 INSTALL SEWER CLEANOUT PER SDRSD SC- 01.

PROVIDE 6" OR 8" 0 FRAME AND LID PER COV STD
DWG SWR- 9A OR SWR- 9B.
18 INSTALL 6- FT 0 ARMOROCK POLYMER CONCRETE
MANHOLE SIM TO COV STD DWG Si SWR- 07,
290 SWR- 28, SWR- 29 AND SWR- 30B.
19 INSTALL 5- FT 0 ARMOROCK POLYMER CONCRETE
MANHOLE SIM TO COV STD DWG Si Si
SWR- 28, SWR- 29 AND SWR- 3013.
280 27 SAWCUT, REMOVE AND REPLACE CONCRETE CURB

AND GUTTER IN - KIND TO NEAREST CJ PER SDRSD
G- 2 AND G- 11.
28 SAWCUT, REMOVE AND REPLACE CONCRETE
SIDEWALK IN - KIND TO NEAREST CJ PER SDRSD G- 7
270
G- 9 AND G- 11.
33 INSTALL TWO ( 2) 100 CFM PASSIVE ODOR CONTROL

DRUM SCRUBBERS BY PURAFIL ( OR APPROVED
EQUAL) WITH UV INHIBITED HDPE ENCLOSURE.
40 PROVIDE VENTED MH COVER INSERTS WI VENTED
MH COVER & FRAME. PROVIDE FRW INDUSTRIES,
INC. PEACEMAKER " INFLOW PROTECTOR INSERTS,"
OR EQUAL. LIFTS TO BASKET SHALL BE TYPE 316
SST.

DISPOSITION NOTES
2 POTHOLE EXIST CROSSING UTILITIES AND
REPORT FINDINGS TO ENGINEER AT LEAST 14
DAYS PRIOR TO TRENCH EXCAVATION.

VELOCITY ( FT/ S) d/ D
NO. CDWP FWWP CDWP FWWP
0 4. 43 5. 29 0. 45 0. 78
17 3. 00 6. 92 1 1

PIPELINE DATA

NUMBER RADIUS LENGTH

LINEICHORD

DIRECTION
5 1524. 24 N53" 4655.78' E W
0 0
40'
0• 40' ' 90, 0
SCALE.-
r' = 40' C-'
18 v) w
z
BUENA
SANITATIONDISTRICT w

IMPROVEMENT
PLANS FOR: D_ RUENA
OUTFALL FORCE MAIN, PHASE III 2 PALOMAR
AIRPORT ROAD 0 STA
169+ 00 TO STA 179+ 00 0 G.

I. P. NO. 22MLL_ APPROVED
0 SEE

TITLE SHEET DISTRICT

ENGINEER RCE EXPIRES DATE HEET
22 OF 39 J BENCH
MARK: SEE SHEET1 DATi USGS DRANrNG NO 4505
Li
w
J
CDP14- 06, COC DWG NO. 485- 511 1.

CONTRACTORTO CONFIRMELEVATIONSOF LATERALCONNECTIONSAND
EXISTINGUTILITIES PRIOR TO CONSTRUCTION. 2.

STAY WITHINEXISTINGEASEMENTSDURING CONSTRUCTION. RIGHT
OF WAY
06/24/2025
C10
187 of 352
FENCE
I ' 00010'
WI. TAT wwiam.. Y r. T.,=. 1. I r.

AERIAL VIEW
SCALE: NTS
MANHOLE # 29
a
Immol
HILL

GROUND VIEW
SCALE: NTS
low
0 I
I
O
O
06/24/2025
C10
188 of 352

EXISTING MEDIAN
d
O d
d °
8 d
d
p1
4 PLAN VIEW
SCALE: NTS
a
EXISTING 24" X 24" HEAT INFUSED HDPE

TEE ( SEE PIPE TABLE FOR THE

APPLICABLE DIMENSION RATING)

SECTION A - A
SCALE: N. T. S

IDPE TEE
210
LEGEND:

CONSTRUCTION NOTE ( THIS SHEET)
EQUIPMENT LIST CALLOUT ( SEE SHEET G1. 1)
EQUIPMENT:

O2 3" AIR COMBINATION VALVE
3" VALVE ENCLOSURE
NOTES:

SECTION B- B
SCALE: N. T. S

CONSTRUCTION NOTES
NO. DESCRIPTION
5 INSTALL 3" SS FEMALE TEE.
9 INSTALL 3" PVC SCH 80 PIPE ( WELDED).
11 INSTALL 3" PVC SCH 80 BALL VALVE ( WELDED).
13 INSTALL 4" PVC SCH 80 PIPE ( WELDED).
22 INSTALL 3" C- 26 AIR COMBINATION VALVE PER DETAIL D ON M4. 4. 44 INSTALL REMOVABLE BOLLARD PER DETAIL A ON SHEET M4. 1. 50 CONTRACTOR TO TRENCH AND RESTORE MEDIAN.
56 INSTALL 3" PVC SCH 80 WYE WITH REMOVABLE CAP.
57 INSTALL THRUST BLOCK AND ANCHOR BLOCK PER DETAIL B ON SHEET M4. 1. 80 INSTALL 3" PVC SCH 80 LONG RADIUS PVC ELBOW.
83 INSTALL WELDOLET.
85 INSTALL 3" PVC SCH 80 TRUE UNION.
86 INSTALL 6" 900 HDPE VERTICAL ELBOW.
z
Q

1. ALL PVC MATERIAL SHALL BE SCH. 80.
0 2. CONTRACTOR TO RESTORE CENTER MEDIAN CONCRETE WITH SIMILAR COLOR AND PATTERN TO EXISTING MEDIAN. O

3. MANHOLE SHALL BE LOCATED IN THE STREET, THE DISTANCE FROM THE SIDEWALK WILL VARY ON THE LOCATION. O 06/24/2025
C10
189 of 352

EXISTING

EXISTING PLUG VALVE

W/ BLIND FLANGE

EXISTIN
OUT
EXISTING 26" HDPE
bUALL: N. 1. 6
I
SLOPE (0.5%)
ow

SECTION A
SCALE: N. T. S
LEGEND:

X CONSTRUCTION NOTE ( THIS SHEET)
EQUIPMENT LIST CALLOUT ( SEE SHEET G1. 1)
EQUIPMENT:
02 3" AIR COMBINATION VALVE
3" VALVE ENCLOSURE

CONSTRUCTION NOTES
NO. DESCRIPTION
9 INSTALL 3" PVC SCH 80 PIPE ( WELDED).
55 CONTRACTOR TO RESTORE PAVEMENT PER DETAIL A & C ON SHEET M4. 0. 56 INSTALL 3" PVC SCH 80 WYE WITH REMOVABLE CAP.
57 INSTALL THRUST BLOCK AND ANCHOR BLOCK PER DETAIL B ON SHEET M4. 1. 60 INSTALL 24" IPS X 6" IPS ELECTROFUSION BRANCH SAFFLE, ELOFIT OR ENGINEER APPROVED EQUAL PER DETAIL E ON SHEET M4. 3. 66 PROTECT SADDLE USING NO- OX- ID, ONLY IF THE SADDLE IS METALLIC. 86 INSTALL 6" 90" HDPE VERTICAL ELBOW.
87 INSTALL 6" HDPE X PVC TRANSTIONAL COUPLING.
88 INSTALL 6" x3" SCH 80 PVC REDUCER ( WELDED).

A1 1TCG'.

1. ALL PVC MATERIAL SHALL BE SCH. 80.

2. CONTRACTOR TO VERIFY EXISTING FITTINGS AND MATERIAL & REPORT FINDINGS TO ENGINEER. ry
z
I
z
Q
n
06/24/2025
C10
190 of 352
LEGEND:

CONSTRUCTION NOTE ( THIS SHEET)
EQUIPMENT LIST CALLOUT ( SEE SHEET G1. 1)
EQUIPMENT:

O2 3" AIR COMBINATION VALVE
3" VALVE ENCLOSURE
Kin' r0C.

1. ALL PVC MATERIAL SHALL BE SCH. 80.

EXISTING STREET & CURB
4' X 4' CONCRETE PAD FOR

SINGLE COMBO VALVE
4' X 8' CONCRETE PAD FOR

DUAL COMBO VALVE

EXISTING SIDEWALK
VARIES

NEW RIW BOUNDARY
13 Q
11 56
9 d a • •
0 ARIES VARIES
80 d °
57 EXISTING GROUND
I I -

NEW EASEMENT BOUNDARY

SECTION VIEW - ALTERNATIVE LOCATION BEHIND SIDEWALK

CONSTRUCTION NOTES
NO. DESCRIPTION
9 INSTALL 3" PVC SCH 80 PIPE ( WELDED).
11 INSTALL 3" PVC SCH 80 BALL VALVE ( WELDED).
13 INSTALL 4" PVC SCH 80 PIPE ( WELDED).
56 INSTALL 3" PVC SCH 80 WYE WITH REMOVABLE CAP.
57 INSTALL THRUST BLOCK AND ANCHOR BLOCK PER DETAIL B ON SHEET M4. 1. 80 INSTALL 3" PVC SCH 80 LONG RADIUS PVC ELBOW.

SCALE: N. T. S
Q
n
06/24/2025
C10
191 of 352
w
HDPE

EXISTING
PIPE
2'- 0" M I 1
OUTLET
d
d°
L V IV111 1.
61 c-.o

SLOPE INLET
d °
U)
w
d (
j
d
a
EXI
101-011 F

SIDE VIEW
SCALE: N. T. S

SECTION A - A
SCALE: N. T. S
E
PHASE 1

1. CONTRACTOR TO EXPOSE THE END OF THE INLET AND OUTLET PIPE IN THE MANHOLE. CONTRACTOR ON THE FIELD TO DETERMINE IF 2' MINIMUM IS SUFFICIENT.

2. PARTIAL BREAK/ DEMOLISH MANHOLE BENCH & FLOOR AS NECESSARY TO ALLOW FOR FITTINGS. CONTRACTOR ON THE FIELD TO DETERMINE SAW CUT DISTANCE.

SIDE VIEW
SCALE: N. T. S
PHASE 2

1. INSTALL ELECTRO FUSION RESTRAINT TO THE EXISTING PIPE AND NEW ELECTRO FUSION COUPLING.

2. INSTALL SS VICTAULIC COUPLING WITH HDPE SPOOL W/ GROOVED ENDS.

PHASE 1 N. T. S. I A I PHASE 2

CONSTRUCTION NOTES
NO. DESCRIPTION
51 INSTALL ELECTRO FUSION BONDED COUPLING BY ICONIX WATERWORKS OR ENGINEER APPROVED EQUAL PER DETAIL B ON SHEET M4. 3. 52 INSTALL SS VICTAULIC COUPLING STYLE 908, OR ENGINEER APPROVED EQUAL PER DETAIL D ON SHEET M4.3. 58 REMOVE AND REPLACE MANHOLE CONE IF NECESSARY FOR PLACEMENT OF FITTINGS. 61 DEMO INDICATED MINIMUM DISTANCE BEYOND THE INLET AND OUTLET OF THE EXISTING MANHOLE. 62 CONTRACTOR TO DETERMINE SAW CUT DISTANCE TO ALLOW ROOM FOR INDICATED PIPE FITTINGS. 69 INJECT HIGH STRENGTH CONCRETE TYPE 5, 4500 PSI, WATER CEMENT RATIO 0.45 TO THE INDICATED AREA. 72 INSTALL 24" HDPE T SPOOL WITH GROOVED ENDS.
73 INSTALL ELECTRO FUSION FLEX RESTRAINT BY ICONIX WATERWORKS OR ENGINEER APPROVED EQUAL PER DETAIL C ON SHEET M4. 3. 79 REMOVE AND REPLACE UPPER MANHOLE CONE SECTION PER DETIAL A ON SHEET M4. 2.

NOTES:

HDPE

EXISTING
PIPE
PHASE 3
d
a
c
d
d

SIDE VIEW
SCALE: N. T. S

SECTION B- B
SCALE: N. T. S

1. REPAIR THE FLOOR, INLET AND OUTLET OPENINGS W/ HIGH STRENGTH CONCRETE.

2. REPAIR EXISTING MANHOLE PER CITY STANDARDS.
z
Q
O
O
N. T. S. I B PHASE 3 N. T. S. I C

1. SEE SHEET C1. 0 FOR MANHOLE RIM & INVERT ELEVATIONS FOR EACH RESPECTIVE MANHOLE.

2. SEE SHEET C1. 0 FOR VARYING PIPE SIZE AND DIMENSION RATIO ( DR).

3. ALL NUTS & BOLTS SHALL BE SS 316.

NO. DESCRIPTION CITY DATE VID DATE 55075

APPROVED CHANGES ENGINEER OF WORK RCE
3/ 20/ 24
06/ 30/ 2024
EXP. LIC. DATE DATE
FESSIONq
z
No. 55075
Exp. 06-30-2
cjvTFOF C
M2. OA

BUENA SANITATION DISTRICT
IMPROVEMENTPLANSFOR: EMERGENCY MODIFICATIONS

BUENA OUTFALL FORCE MAIN, PHASE III

GRAVITY TO FORCE MAIN DETAIL

PPROVED
SEE TITLE SHEET 55075 06/ 30/ 24

GREG MAYER RCE EXPIRES DATI
BENCH MARK: DATUM:

SEE SHEET 1 OF 52 — TITLE SHEET
SHEET 24 OF52
DRAWING NO.
4505
06/24/2025
C10
192 of 352
H
EXI
PIPE 10'- 011 ,

SIDE VIEW
SCALE: N. T. S

SECTION A - A
PHASE 1
SCALE: N. T. S

1. CONTRACTOR TO EXPOSE THE END OF THE INLET AND OUTLET PIPE IN THE MANHOLE. CONTRACTOR ON THE FIELD TO DETERMINE IF 2' MINIMUM IS SUFFICIENT.

2. PARTIAL BREAK/ DEMOLISH MANHOLE BENCH & FLOOR AS NECESSARY TO ALLOW FOR FITTINGS. CONTRACTOR TO DETERMINE SAW CUT DISTANCE.

PHASE 1

CONSTRUCTION NOTES
NO. DESCRIPTION
51 INSTALL ELECTRO FUSION BONDED COUPLING BY ICONIX WATERWORKS OR ENGINEER APPROVED EQUAL PER DETAIL B ON SHEET M4. 3. 52 INSTALL SS VICTAULIC COUPLING STYLE 908, OR ENGINEER APPROVED EQUAL PER DETAIL D ON SHEET M4. 3. 53 INSTALL SS 24" BLIND FLANGE BY FERGUSON OR ENGINEER APPROVED EQUAL. 58 REMOVE AND REPLACE MANHOLE CONE IF NECESSARY FOR PLACEMENT OF FITTINGS. 61 DEMO INDICATED MINIMUM DISTANCE BEYOND THE INLET AND OUTLET OF THE EXISTING MANHOLE. 62 CONTRACTOR TO DETERMINE SAW CUT DISTANCE TO ALLOW ROOM FOR INDICATED PIPE FITTINGS. 69 INJECT HIGH STRENGTH CONCRETE TYPE 5, 4500 PSI, WATER CEMENT RATIO 0.45 TO THE INDICATED AREA. 73 INSTALL ELECTRO FUSION FLEX RESTRAINT BY ICONIX WATERWORKS OR ENGINEER APPROVED EQUAL PER DETAIL C ON SHEET M4. 3.

F
EXI
f

SIDE VIEW
SCALE: N. T. S
PHASE 2

1. INSTALL FUSION BONDED HDPE DR 17 COUPLING TO THE EXISTING PIPE END WITH AN HDPE NIPPLE W/ GROOVED END.

PHASE 2
NOTES:

1. SEE SHEET C1. 0 FOR MANHOLE RIM & INVERT ELEVATIONS FOR RESPECTIVE MANHOLE.

2. SEE SHEET C1. 0 FOR VARYING PIPE SIZE AND DIMENSION RATIO ( DR) FOR FITTINGS.

3. WHEN POSSIBLE, REUSE EXISTING 24" BLIND FLANGE AT GRAVITY MANHOLE LOCATIONS.

NO. DESCRIPTION ICITY

APPROVED CHANGES
rw!
1-
EXI
f

SIDE VIEW
SCALE: N. T. S

SECTION B- B
SCALE: N. T. S
PHASE 3
REPAIR THE FLOOR, INLET AND OUTLET OPENINGS W/ HIGH STRENGTH CONCRETE. ry
0 I
W
V)
V)
z
Q
n
N. T. S. B PHASE 3 N. T. S. C
CD
O

DATE VID
I
DATE 55075

ENGINEER OF WORK RCE
3/ 20/ 24
06/ 30/ 2024
EXP. LIC. DATE DATE
OFESSION9
z
r,
No. 55075
Exp. 06-30-2
CIVI

TFOFCAVZF
M2. 0B

BUENA SANITATION DISTRICT
IMPROVEMENTPLANSFOR: EMERGENCY MODIFICATIONS

BUENA OUTFALL FORCE MAIN, PHASE III

GRAVITY TO FORCE MAIN DETAIL

APPROVED
SEE TITLE SHEET 55075 06/ 30/ 24

GREG MAYER RCE EXPIRES DATE
BENCH MARK: DATUM:

SEE SHEET 1 OF 52 — TITLE SHEET
SHEET 25 OF52
DRAWING NO.
4505
06/24/2025
C10
193 of 352
HDPE

EXISTING

PIPE ( SEE
NOTE 2)
PHASE 1
PHASE 1
OUTLET
d
a
a
m d
d
d A.

X X
d
d
a
d cd
dA e
a
11'- 0"

SIDE VIEW
SCALE: N. T. S

SECTION A - A
SCALE: N. T. S
HDPE

EXISTING

PIPE ( SEE
NOTE 2)
E

1. CONTRACTOR TO EXPOSE THE END OF THE INLET AND OUTLET PIPE IN THE MANHOLE. CONTRACTOR ON THE FIELD TO DETERMINE IF INDICATED MINIMUM IS SUFFICIENT.

2. PARTIAL BREAK/ DEMOLISH MANHOLE BENCH & FLOOR AS NECESSARY TO ALLOW FOR FITTINGS. CONTRACTOR ON THE FIELD TO DETERMINE SAW CUT DISTANCE.

N. T. S. I A
F
EX
I

SIDE VIEW
SCALE: N. T. S
PHASE 2

1. INSTALL HDPE REDUCER. IF THE LENGTH OF THE REDUCER IS TOO LONG TO FIT IN THE EXISTING MANHOLE, DEMOLISH AND REPLACE THE ENTIRE MANHOLE.

2. INSTALL ELECTRO FUSION RESTRAINT TO THE EXISTING PIPE AND NEW ELECTRO FUSION COUPLING.

PHASE 2

CONSTRUCTION NOTES
NO. DESCRIPTION
51 INSTALL ELECTRO FUSION BONDED COUPLING BY ICONIX WATERWORKS OR ENGINEER APPROVED EQUAL PER DETAIL B ON SHEET M4. 3. 52 INSTALL SS VICTAULIC COUPLING STYLE 908, OR ENGINEER APPROVED EQUAL PER DETAIL D ON SHEET M4. 3. 58 REMOVE AND REPLACE MANHOLE CONE IF NECESSARY FOR PLACEMENT OF FITTINGS. 61 DEMO INDICATED MINIMUM DISTANCE BEYOND THE INLET AND OUTLET OF THE EXISTING MANHOLE. 62 CONTRACTOR TO DETERMINE SAW CUT DISTANCE TO ALLOW ROOM FOR INDICATED PIPE FITTINGS. 69 INJECT HIGH STRENGTH CONCRETE TYPE 5, 4500 PSI, WATER CEMENT RATIO 0.45 TO THE INDICATED AREA. 73 INSTALL ELECTRO FUSION FLEX RESTRAINT BY ICONIX WATERWORKS OR ENGINEER APPROVED EQUAL PER DETAIL C ON SHEET M4. 3. 79 REMOVE AND REPLACE UPPER MANHOLE CONE SECTION PER DETIAL A ON SHEET M4.2. 90 INSTALL CUSTOM FABRICATED HDPE REDUCER WITH GROOVED ENDS.

NOTES:
md
F
EX
I

SIDE VIEW
SCALE: N. T. S
m

SECTION B- B
SCALE: N. T. S
PHASE 3

1. REPAIR THE FLOOR, INLET AND OUTLET OPENINGS W/ HIGH STRENGTH CONCRETE.

2. REPAIR EXISTING MANHOLE PER CITY STANDARDS.
0 z
Q
O
O
N. T. S. I B PHASE 3 N. T. S. I C
7--]

1. SEE SHEET C1. 0 FOR MANHOLE RIM & INVERT ELEVATIONS FOR EACH RESPECTIVE MANHOLE.

2. SEE SHEET C1. 0 FOR VARYING PIPE SIZE AND DIMENSION RATIO ( DR) FOR FITTINGS.

3. CONTRACTOR TO PROVIDE AND VERIFY DIMENSIONS OF FITTINGS TO FIT WITHIN THE EXISTING MANHOLE STRUCTURE.

4. ALL NUTS & BOLTS SHALL BE SS 316.

NO. DESCRIPTION CITY DATE VID DATE : 55075

APPROVED CHANGES I ENGINEER OF WORK RCE
3// 20/ 24
06/ 30/ 2024
EXP. LIC. DATE DATE
QoFEssloNq
z
No. 55075
Exp. 06-30-2
cIVZ
OF
M2. 00

BUENA SANITATION DISTRICT
IMPROVEMENTPLANSFOR: EMERGENCY MODIFICATIONS

BUENA OUTFALL FORCE MAIN, PHASE III

GRAVITY TO FORCEMAIN DETAIL

PPROVED
SEE TITLE SHEET 55075 06/ 30/ 24

GREG MAYER RCE EXPIRES DATE
BENCH MARK: DATUM:

SEE SHEET 1 OF 52 — TITLE SHEET
SHEET 26 OF52
DRAWING NO.
4505
06/24/2025
C10
194 of 352
Knowwhat's below.

Call beforeyoudig.

Plotted — 7/ 11/ 2016 8: 56: 53 AM::

E) DUMPSTER &

ENCLOSURE WALL

DECHLORINATIONMODULE
E)
FENCEill
3"
SCH80 PVCD 8"

PVCFA PROPOSED

LIMITS OF EASEMENT
314"
W 8"

WYE (TYP) O / /
8" CLEANOUT3"
SCH80 PVCD 4
E)

WALLZACTIVE
ODORS-
3 ENCLOSUREBUILDING ODOR
CONTROLSITE # 1 PLANSCALE:
1" = 10' 1
CONC PAD 6
o
PROPOSED LIMITS \ 4e
OF EASEMENT / 4
CLEANOUT12\ \ `/ \
2-
10 I
4" 0 BUTTERFLYISOLATION S
i
VALVE ( TYP OF 2) s, PASSIVE
ODOR 5 DRUM
SCRUBBERC- 22 ! Z"
SCH80PVDD / X, i / 4"
SCH80 PVCFA Q /
4"
0 BUTTERFLYISOLATION / VALVE (
TYP OF 2) 4"
SCH80 PVCMH / HDPE
x ' VC\PENETRATION
TRAiJSITION\`\\
IE
295.8 COUPLING\\
26"
HDPEFM 2"

FUSEDHDPE LATERAL
30"

HDPEGRAVITY
SEWER MH #
29 4"

FUSEDHDPE LATERAL
ODOR
CONTROLSITE # 3 PLANSCALE:
1" = 10' 12/
3/ 20156: 08: 18 PM :: N:\ PROJ\838\ CurrentSubmittal\ Design\ struc\ 838— SO2. dwg :: Hector. Robledo m

1. PIPE MINIMUMSLOPE TO DRAIN: 1/ 4 "/ FT. AND 3'- 6" MINCOVER. 2.

FIELD ROUTE ALL MECHANICALFA ANDDRAIN, AS SHOWNOR AS OTHERWISE DETERMINED BY FIELDCONDITIONS. PROVIDE ALL FITTINGS
AS REQUIRED. ACHIEVE MINIMUM CLEARANCESUNLESS OTHERWISE APPROVED. ALL DIMENSIONSSHOWN ARE NOMINALAND SHALL

BE FIELDLOCATEDAND VERIFIEDPRIOR TO INSTALLATIONBY THE
CONTRACTOR. 3.

ALL FA PIPINGBELOW GRADE SHALL BE SCH80 PVC. ALL ABOVEGRADE FA PIPINGSHALL BE FLG FRP W/ WHITEGEL COAT FINISH. FOR
REFERENCEONLY 5'-
0" 18'- 8" 6'- 4" DECHLORINATION
MODULE
o
71 PROPOSED

LIMITS CD
II

OF EASEMENTI

III I , I
R/
W — II II—
a I
R/
W — — N
5 II U I
II I 3/
4" RWSERVICEMETER I II 8" CLEANOUTACTIVE

ODOR A II

I IENCLOSURE
BUILDING S 3 II I I
II _ II I
I / 314"
RW 8"
SCH80 PVCFA II
3"
SCH80 PVC
D II
I HDPE
x PVCII 1 l TRANSITION
1 II I I8" 0 BUTTERFLYISOLATION COUPLING
I II I IVALVE ( TYP OF 2) I
JJ TO SCH80 PVC24" HDPE3"
FUSEDHDPE1 / J
MH
PENETRATIONz — — — — — — — —
5—

GRAVITY

SEWER LATERAL
1 1 //
1---_—
IE15s
5— I
8"
FUSEDHDPE MH # 16 LATERAL
I 1
I

PALOMARAIRPORTROAD I
ODOR
CONTROLSITE # 2 PLANr2 SCALE:
1" = 10' HORIZONTAL

CONTROL ONORTHING

EASTING
1 1988347. 7270 6234287. 6685 2
1988359. 2511 6234279. 7318 3
1988369. 8365 6234295. 1019 4
1988358. 3124 6234303. 0386 5
1988883. 2936 6244111. 6682 6
1988897. 2783 6244112. 1431 7
1988896. 6450 6244130. 7950 8
1988882. 6603 6244130. 3201 9
1991263. 0098 6248206. 5461 10
1991253. 3146 6248213. 6173 11
1991249. 7789 6248208. 7697 12
1991259. 4742 6248201. 6985 AS
BUILTSCALE:•
mam
v
III
O
r cn
rV VnJcn
W
Ld
W
In
In
r
n V
J o
z
U
Q O
CL W
W
O J
O
06/24/2025
C10
195 of 352
EXISTING 24" HDPE DR 11
12'- 9"±

PROTECT IN
EXISTI1'

EXISTING PIF

CONNECTION

PLAN VIEW
SCALE: N. T. S
EXISTING I ® EQUIPMENT:

BLOWER
EL. ± 158. 0'
EQUIPMENT 2" COMBINATION AIR VALVE
EXISTING STREET EXISTING SIDEWALK 40 EXISTING ( D 8" COMBINATION AIR VALVE AND CURB 41 33
6 1
EL. ± 156. 0'

LEVEL PRESSURE TRANSMITTER
47 & PRESSURE SWITCH

GRINDER PUMP STATION
2" AIR VAC ENCLOSURE
000111 63 34 EL. ± 153. 31 27A 63 - m
24 Ne
Q
C
28 EL. ± 153. 42
0 SECTION A
SCALE: N. T. S

SECTION B

CONSTRUCTION NOTES
NO. DESCRIPTION
1 INSTALL 1- 1/ 4" SCH 80 PVC PIPE ( WELDED).
2 INSTALL 2" PVC SCH 80 PIPE ( WELDED).
3 INSTALL 2" 900 PVC SCH 80 HORIZONTAL ELBOW.
4 INSTALL 2" 900 PVC SCH 80 VERTICAL ELBOW.
6 INSTALL 2" U- TUBE PVC VENT DISCHARGE WITH MESH.
8 INSTALL 2" x 1- 1/4" SCH 80 PVC REDUCER ( WELDED).
9 INSTALL 3" PVC SCH 80 PIPE ( WELDED).
10 INSTALL 3" PVC SCH 80 TEE ( WELDED).
11 INSTALL 3" PVC SCH 80 BALL VALVE ( WELDED).
12 INSTALL 3" x 2" PVC SCH 80 REDUCER ( WELDED).
13 INSTALL 4" PVC SCH 80 PIPE ( WELDED).
14 INSTALL 4" x 4" x 2" SCH 80 PVC TEE ( WELDED).
16 INSTALL 4" x 3" PVC SCH 80 REDUCER ( WELDED).
20 INSTALL 4" 450 PVC SCH 80 VERTICAL ELBOW ( WELDED).
24 INSTALL 8" PVC SCH 80 PIPE ( WELDED).
25 INSTALL 8" PVC SCH 80 FLANGE.
26 INSTALL 8" PVC SCH 80 BALL VALVE ( WELDED).
27 INSTALL 8" PVC SCH 80 COUPLING ( WELDED).
28 INSTALL 8" 900 PVC SCH 80 VERTICAL ELBOW ( WELDED).
29 INSTALL 8" D- 26 AIR COMBINATION VALVE ( FLANGED).
30 INSTALL 8" SCH 80 PVC CAP TO EXISTING MANHOLE PENETRATION. 32 CUT AND INSTALL 4" DRAIN HOLE IN VAULT FILLED WITH GRAVEL. 33 INSTALL 9' x 9' x 8.5' PRECAST CONCRETE VAULT.
34 INSTALL SS 316L LADDER IN VAULT.
35 CONTRACTOR TO SAW CUT AND REPLACE CONCRETE FLOOR SLAB. 36 INSTALL DH071 E/ ONE EXTREME SERIES SIMPLEX GRINDER PUMP STATIONS. 38 INSTALL 6'-4" x 5'-3" x 5' PRECAST CONCRETE VAULT.
40 INSTALL 2' X 2' X 4" CONCRETE PAD.
41 INSTALL T- O" X T - 0" ( MIN. CLEAR OPENING) H-20 RATED ALUMINUM DOUBLE DOOR ACCESS HATCH METAL SAFETY GRAFTING PER BILCO, OR ENGINEER APRROVED EQUAL. 42 INSTALL 1- 1/4" 900 SCH 80 PVC VERTICAL ELBOW ( WELDED). 43 INSTALL 1- 1/4" SCH 80 PVC TEE ( WELDED).
46 CONNECT PROPOSED PVC PIPING TO EXISTING 3" RETURN LINE ( WELDED). 47 CONNECT PROPOSED PVC PIPING TO THE EXISTING FLANGE FITTING IN ODOR CONTROL BUILDING.
57 INSTALL THRUST BLOCK AND ANCHOR BLOCK PER DETAIL B ON SHEET M4. 1. 59 REMOVE AND REPLACE EXISTING 8" HDPE X PVC TRANSTIONAL COUPLING. 63 INSTALL PIPE PENETRATION PER DETAIL C ON SHEET M4. 1. 64 INSTALL PRESSURE TRANSMITTER AND PRESSURE SWITCH PER DETAIL E ON SHEET M4. 1. 67 INSTALL PIPE SUPPORT PER DETAIL C ON SHEET M4. 2.
68 INSTALL 3" PVC SCH 80 UNION ( WELDED).
76 INSTALL 8" 450 PVC SCH 80 HORIZONTAL ELBOW ( WELDED). 77 INSTALL 2" PVC SCH 80 UNION.

NOTES:

SCALE: N. T. S

1. ALL PVC MATERIAL SHALL BE SCH. 80.

2. CONSTRUCTION TO REMAIN IN EXISTING EASEMENTS.

3. CONTRACTOR TO POTHOLE AND CONFIRM ELEVATIONS OF EXISTING UTILITIES AND PIPING PRIOR TO CONSTRUCTION.

4. 2" VENT LINE TO RISE IN GRADE FROM THE 4" RETURN LINE TO THE RISER BEHIND THE EXISTING ODOR CONTROL UNIT # 2 STRUCTURE.

5. CONTRACTOR TO VERIFY ALL LOCATIONS LABELED AS " TBD".

6. ALL PIPING BEHIND CURB SHALL BE BACKFILLED WITH 1-SACK SAND SLURRY AND WITH 1 FT NATIVE BACKFILL TO FINISHED SURFACE, ALL OTHER MATERIAL SHALL BE REMOVED AND DISPOSED OF PROPERLY.
z
I
W
V)
V)
iI
z
Q
CL
06/24/2025
C10
196 of 352
6 T4
I
BLOWER
EQUIPMENT NOTES:

1. ALL PVC MATERIAL SHALL BE SCH. 80.

2. CONSTRUCTION TO REMAIN IN EXISTING EASEMENTS.

3. CONTRACTOR TO POTHOLE AND CONFIRM ELEVATIONS OF EXISTING UTILITIES AND PIPING PRIOR TO CONSTRUCTION.

I

EXISTING
65 ( TYP.)
47 z
1124 ' I I '
II =
1 ILI
28 EL. ± 153. 42 V)
4 3
24 V)
z
Q
CL

SECTION A
SCALE: N. T. S
O
O
7- 1
M3. 1B

BUENA SANITATION DISTRICT
IMPROVEMENTPLANSFOR: EMERGENCY MODIFICATIONS

BUENA OUTFALL FORCE MAIN, PHASE III
ODOR CONTROL UNIT 2 DETAIL IIQoFESSIONq

APPROVED
SEE TITLE SHEET 55075 06/ 30/ 24
r SHEET 29 OF52
No, 55075 GREG MAYER RCE EXPIRES DATE
Exp. 06-30-2
3/ 20/ 2420
T
BENCH MARK: DATUM: DRAWING NO.

NO. DESCRIPTION CITY DATE VID DATE
i -
55075 06/ 30/ 2024 9 I V I-
F
OF SEE SHEET 1 OF 52 — TITLE SHEET 4505
APPROVED CHANGES ENGINEER OF WORK RCE EXP. LIC. DATE DATE CAS -CFO z CONSTRUCTION NOTES
NO. DESCRIPTION
2 INSTALL 2" PVC SCH 80 PIPE.
3 INSTALL 2" 90° PVC SCH 80 HORIZONTAL ELBOW.
4 INSTALL 2" 90° PVC SCH 80 VERTICAL ELBOW.
6 INSTALL 2" U-TUBE PVC VENT DISCHARGE WITH MESH.
24 INSTALL 8" PVC SCH 80 PIPE.
2g INSTALL 8" 90° PVC SCH 80 VERTICAL ELBOW ( WELDED).
65 INSTALL SS VERTICAL PIPE WALL SUPPORT PER ATLAS KBS- V, OR APPROVED EQUAL PER DETAIL D ON SHEET M4. 1.
06/24/2025
C10
197 of 352

EXISTIN(

EXISTING
EXISTING 2" PIPE
6 I

EXISTING EASEMENT
EXISTING 30" HDPE DR 17 EXISTING PIPE

CONNECTIONS

PLAN VIEW
SCALE: N. T. S

EXISTING PAD

KISTING EASEMENT
EXISTING 26" HDPE DR 11

EXISTING STREET

AND CURB
EL. ± 294. 2'

EXISTING SIDEWALK
75 SLOPE (0.5%)
0 r: YlcTlnlr DACCI\/ D nnnD

SECTION A
SCALE: N. T. S

SECTION B
SCALE: N. T. S
NOTES:

1. ALL PVC MATERIAL SHALL BE SCH. 80.

2. CONSTRUCTION TO REMAIN IN EXISTING EASEMENTS.

3. CONTRACTOR TO POTHOLE AND CONFIRM ELEVATIONS OF EXISTING UTILITIES AND PIPING PRIOR TO CONSTRUCTION.

4. ALL PIPING BEHIND CURB SHALL BE BACKFILLED WITH 1- SACK SAND SLURRY AND WITH 1

FT NATIVE BACKFILL TO FINISHED SURFACE, ALL OTHER MATERIAL SHALL BE REMOVED AND DISPOSED OF PROPERLY.

CYICTIAI(_
IVV. 1 1vil
2 INSTALL 2" PVC SCH 80 PIPE ( WELDED).
3 INSTALL 2" 900 PVC SCH 80 HORIZONTAL ELBOW.
13 INSTALL 4" PVC SCH 80 PIPE ( WELDED).
17 INSTALL 4" PVC SCH 80 FLANGE.
18 INSTALL 4" PVC SCH 80 BALL VALVE.
19 INSTALL 4" PVC SCH 80 UNION ( WELDED).
21 INSTALL 4" 900 PVC SCH 80 HORIZONTAL ELBOW.
22 INSTALL 4" D- 26 AIR COMBINATION VALVE.
23 INSTALL 4" SCH 80 PVC CAP TO EXISTING MANHOLE PENETRATION. 24 INSTALL 8" PVC SCH 80 PIPE ( WELDED).
31 INSTALL 4" 900 PVC SCH 80 VERTICAL ELBOW.
32 CUT AND INSTALL 4" DRAIN HOLE IN VAULT FILLED WITH GRAVEL. 37 INSTALL 4" SCH 80 PVC TEE.
38 INSTALL 6'-4" x 5'- 3" x 5' PRECAST CONCRETE VAULT.
39 REMOVE AND REPAIR EXISTING 4" PVC SCH 80 LINE AT 0. 5% GRADE. 41 INSTALL T- 0" X T - 0" ( MIN. CLEAR OPENING) H- 20 RATED ALUMINUM DOUBLE DOOR ACCESS HATCH METAL SAFETY GRAFTING PER BILCO, OR ENGINEER APRROVED EQUAL. 45 CONNECT PROPOSED PVC PIPING TO EXISTING PASSIVE ODOR CONTROL DRUM SCRUBBER. 48 INSTALL 2" PVC SCH 80 UNION ( WELDED).
49 INSTALL 2" PVC SCH 80 VALTERRA CHECK VALVE, OR ENGINEER APPROVED EQUAL. 54 INSTALL 4" 450 PVC SCH 80 HORIZONTAL ELBOW ( WELDED). 57 INSTALL THRUST BLOCK AND ANCHOR BLOCK PER DETAIL B ON SHEET M4. 1. 63 INSTALL PIPE PENETRATION PER DETAIL C ON SHEET M4. 1. 67 INSTALL PIPE SUPPORT PER DETAIL C ON SHEET M4. 2.
71 CONTRACTOR TO PAINT EXPOSED VAULT TAN COLOR TO MATCH GROUND. 74 CONNECT PROPOSED PVC SCH 80 PIPING TO EXISTING 2" RETURN LINE. 75 REMOVE AND REPLACE EXISTING 4" HDPE X PVC TRANSTIONAL COUPLING.

LEGEND:

X CONSTRUCTION NOTE ( THIS SHEET)
EQUIPMENT LIST CALLOUT ( SEE SHEET G1. 1)
EQUIPMENT:

Q2 4" COMBINATION AIR VALVE
06/24/2025
C10
198 of 352
MIN. 1. 5' TO LIP MIN. 1. 5' TO LIP

OF GUTTER OF GUTTER

AC SURFACE COURSE -

1. 5' MIN. AC SURFACE 1. 83' M
f V MIN. COURSE 0. 5' MIN.

EXISTING AC
I
EXISTING AC \ ( BOTH SI

EXISTING

AGGREGATE BASE
COMPACT TOP 12"

NATIVEOF NVE BACKFILLOFATI
BASE

AC I COMPACT
AGGREGATE 083'
MAX. BASE

MATERIALTO EXISTING

AGGREGATE
BASE

DENSITY
95%

DENSITYCOMPACT

NATIVE CEMENT SLURRY BACKFILL
TO 90% BACKFILL CLASS DENSITY
380- E- 800TYPE

A TYPE B EXCAVATED

TRENCH ROCKSAW TRENCH SEE
SRF- 08B FOR TRENCHPAVING NOTES) ( SEE SRF- 08B FOR TRENCHPAVING NOTES) AC

SURFACE I
IF

DISTANCEFROM LIP OF GUTTERTO EDGEOF TRENCHCOURSE
3' MIN. EXCEEDS 15, TYPE A ORTYPEB TRENCHMAY BE USEDf
V MIN. 3/ 8" LIP EXISTING

AC EXISTING

CURB & GUTTER EXISTING

AGGREGATE

BASE BASE AC IF DISTANCEFROM LIP COMPACT

AGGREGATE COMPACT
TOP 12" OF GUTTERTO EDGEBASE

MATERIALTO OF
NATIVEBACKFILL OF TRENCHEXCEEDS 95%

DENSITYTO
95% DENSITY15, TYPE A ORTYPEB COMPACT

NATIVE TRENCH MAY BE USEDBACKFILL
TO 90% AC SURFACEDENSITY

TYPE C COURSE TRENCH
ADJACENT TO GUTTEREXISTING AC 1 MIN. ROCKSAW

OR EXCAVATED) EDGE OF SEE
SRF- 08B FOR TRENCHPAVING NOTES) n . 4.. PAVEMENT
BASE

AC ASPHALT

LEGEND EXISTING AGGREGATE
BASE C
COMPATPA12"
NEW1/ 2" MEDIUMASPHALT COMPACT AGGREGATE TOP N
NEW3/ 4" MEDIUMASPHALT BASE
MATERIALTO NATIVE 95/
o DENSITYBACKFILL TO EXISTING

ASPHALT COMPACT
NATIVE 95% DENSITYBACKFILL
TO 90% DENSITY
TYPE

D NATIVE
BACKFILL = S. E. 30 ( MINIMUM); NATIVE
BACKFILL MAY BE REPLACEDWITH 2 SACKTRENCH AT EDGEOF PAVEMENTCEMENT SLURRY IF APPROVEDBY CITYENGINEER (SEE SRF- 08B FOR TRENCHPAVING NOTES) Revision By ApprvdDate CITY
OF VISTANew
DS 10/ 89 STANDARD DRAWING Updated
GL TS 05/ 07/ 12 CITY ENGI EER, DATE RCE
55075 TRENCH

RESURFACINGDRAWBI

NG SRF-
08A NUER: SRF-
08A TRENCHRESURFACING (CITY OF VISTA) LIMIT
OF 3" GRINDMIN. i
ii i0i0ii i i0i i SAWCUT

LINE TYPICAL
1 -
FT. ASPHALT CONCRETE MIN.

FINISH COURSE SEE
GS- 28 LIMIT
OF 3" GRINDEXISTING
AC ( TYP.)
AND

BASE ASPHALT

CONCRETE BASE
COURSE, SEE GS- 28 AGGREGATE

BASE PIPE

BEDDINGAND BACKFILLPER PROJECT

PLANS, SPECIFICATIONS, AND
CITY STANDARDS. NOTES:

1. THEDETAILSHOWN ABOVE APPLIES TO TRENCHWIDTHS LESS THAN 25 INCHES. 2.

EXISTINGA. C. SHALLBE CUT AND REMOVEDIN SUCHA MANNERSO AS NOT TO TEAR, BULGE OR DISPLACEADJACENT PAVEMENT. EDGES SHALL BE CLEANAND VERTICAL. ALL CUTS SHALL BE PARALLELOR PERPENDICULAR TO STREETCENTERLINE, WHEN PRACTICAL. 3.

BASEMATERIALSHALL BE REPLACEDTO DEPTHOF EXISTINGBASE OR A MINIMUMOF 6 INCHES, WHICHEVERIS GREATER. A. C. MAYBE SUBSTITUTEDFOR BASE MATERIALAT THE CITY ENGINEER'S DISCRETION. 4.

WHENTHE EDGE OF THE GRIND AREA IS WITHIN24 INCHESOF EDGEOF PAVEMENT, ANY STRUCTURE, AN ADJACENT

TRENCH PATCH OR OTHERPAVING JOIN LINE, THE GRIND AREA SHALL BE EXTENDEDTO THE EXISTING STRUCTURE OR JOIN LINE. 5.

WHENTHE EDGE OF THE GRIND LIES WITHINA WHEELPATH, THE GRIND AREA SHALL BE EXTENDEDTO THE NEAREST LANE LINE OR EDGEOF PAVEMENT. 6.

IN AN EFFORTTO MAINTAINA STREET'S EXPECTEDLIFESPAN, RETURN THE STREETTO THE SAME OR SIMILARCONDITION

AS BEFORETHE TRENCHINGTOOK PLACE, AND TO MEETCITY OF CARLSBADAND GREENBOOKSTANDARDS PERTAINING TO ROADSMOOTHNESS: A)

IF THETRENCHIS LOCATEDWITHIN A BIKELANE, THEN THE ENTIREBIKE LANE WIDTH SHALL BE COLD PLANED 1- 1/ 2" MINIMUMAND OVERLAYED1- 1/ 2" MINIMUM. B) IF THETRENCHIN WITHIN24" OF A CONCRETESTRUCTURE ( I. E. LIP OF GUTTER, VAULT, ETC.) THEN THE AREA BETWEENTHE TRENCHAND THE CONCRETESTRUCTURE SHALL BE COLDPLANED 1- 1/ 2" MINIMUMAND OVERLAYED1- 1/ 2" MINIMUM. C)
IF THETRENCHIS LOCATEDLONGITUDINALLYWITHIN THE TRAVELLANE OF A PRIME, MAJOR, OR 4- LANECOLLECTORSTREET, THEN THE ENTIRELANE SHALL BE COLD -PLANE 1- 1/ 2" MINIMUMAND OVERLAYED1- 1/ 2" MINIMUM. HOWEVER, THE CITY ENGINEERMAY, ON A CASE -BY - CASE BASIS

AND AT HIS/ HER SOLE DISCRETION, MODIFY THE REQUIREMENTTO COLDPLANE AND OVERLAY THE ENTIRELANE BASED ON THE FOLLOWINGCRITERIA: ( 1) EXISTINGCONDITION OF THE PAVEMENT; ( 2) FUTUREREHABILITATIONSTRATEGIES AND SCHEDULE; (3) DEPTHOF TRENCH; (4) OTHER TRENCH WORK IN THE AREA; (5) EXISTENCEOF A COMPARABLETRENCH PAVING TECHNOLOGY OR TECHNIQUESWHICH WOULD ACHIEVE THE DESIREDROAD SMOOTHNESSAND LONGEVITY; AND ( 6) OTHERSITE - SPECIFICCONDITIONS AND FACTORSDEEMED BY THE CITY ENGINEER TO ALLEVIATETHE NEED TO COLD -PLANE AND OVERLAYTHE ENTIRELANE. REV.

APPROVEDDATE CITY OF CARLSBADTRENCH
RESURFACING4
DATE
22 ASPHALT

CONCRETE PAVEMENT CITY

ENGINEERDATE FOR
TRENCHWIDTHS LESS THAN 25" ST' ANDARDNNoGS- 25 GENERAL
PROVISIONS A.

THE GENERALCONTRACTOR IS REQUIREDTO OBTAINA CITYRIGHT- OF- WAY PERMIT FOR ANY AND ALL WORK PERFORMEDWITHIN THE CITY RIGHT- OF- WAY. B.

ALL WORK PERFORMEDREQUIRES CITY INSPECTION. C.

IN NO CASE SHALL TEMPORARYASPHALT OR PLATESBE LEFT IN PLACELONGER THAN TEN ( 10) WORKING DAYS ABOVE TRENCH TYPES A, C & D; NO TRENCHESSHALL BE LEFTOPEN OVERNIGHT. D.

CONSTRUCTIONMATERIALS & CONSTRUCTION METHODS ARE CONSIDEREDTHE MINIMUMREQUIRED AND MAY BE REVISEDBY THE CITY AT ANY TIME. E.

ALL TRENCHINGREQUIRES COMPACTION TESTING OF THE BACKFILLAND AGGREGATEBASE UNLESS WAIVED BY THE CITY ENGINEER. F.

ALL TRENCHPLATES SHALL BE RECESSED (SEE STANDARDDRAWINGS SRF- 11A & SRF- 11B). CONSTRUCTION MATERIALS A.

ASPHALTCONCRETE ( AC): 1/ 2" SURFACECOURSE = C2- AR- 4000-RAP; 3/ 4" BASE COURSE _ B- AR-4000-RAP ( PERFORMANCEGRADE ( PG) ASPHALTBINDER PG 64- 10 MAYBESUBSTITUTEDFOR THE SPECIFIED AR GRADEASPHALT BINDER). B.

AGGREGATEBASE: CLASS 2 ( PER CALTRANSSPECIFICATION SUBSECTION 26- 1. 02B) OR CRUSHEDAGGREGATE BASE ( PER 2012 GREENBOOKSUBSECTION 200- 2. 2). C.

SLURRYBACKFILL: ROCKSAW TRENCH - CLASS 380- E- 800; ALL OTHER: CLASS 190- E- 400 (OR AS APPROVED).

D.

TACK COAT: AR- 4000 PAVING ASPHALT OR GRADESS- 1h EMULSIFIEDASPHALT ( PER 2012 GREENBOOKSUBSECTION 302- 5. 4). CONSTRUCTION
METHODS A.

TYPE A, C & D TRENCHES1.

EXISTINGAC PAVINGSHALL BE SAWCUTAND REMOVEDALONG CLEAN, STRAIGHT LINES, TAKING CARE NOT TO UPLIFTOR TEARADJOININGPAVING ( PER 2012 GREENBOOK300- 1. 3. 2). 2.

AGGREGATEBASE MATERIALTO BE REPLACEDTO DEPTHOF EXISTINGBASE. A MINIMUMOF 6" AC MAY BE SUBSTITUTEDFOR BASE WITH PRIOR CITY APPROVAL. 3.

A TACKCOAT OF ASPHALTICEMULSION OR PAVINGASPHALT SHALL BE APPLIEDTO ALL CONTACTSURFACES.

4. AC BASECOURSE TO MEETEXISTING STREET GRADE - LEAVING DEPRESSIONS FOR CAP PAVINGIS NOT ALLOWED. 5.

AC BASE COURSE DEPTH SHALL BE 1" DEEPERTHAN EXISTING - MINIMUM 4" DEPTHAC SHALLBE HOT - PLANT MIX. 6.

COLDPLANE EXISTING AC PAVEMENTTO A MINIMUMDEPTH OF ONE- HALF THICKNESSOF EXISTINGAC - NOT TO EXCEED2". 7.

AC SURFACECOURSE SHALL BE PLACEDUSING A SPREADERBOX OR PAVINGMACHINE AND SHALL BE DENSIFIED / FINISHED PER 2012 GREENBOOK302- 5. 6. 1 & 302- 5. 6. 2. 8.

AC RESURFACINGSHALL BE SEAL COATED WITH EMULSIFIEDASPHALT AND COVEREDWITH SAND UNLESS WAIVED BY CITY ENGINEER. B.

TYPE B TRENCH1.

CEMENTSLURRY SHALL HAVE A MINIMUM4" SLUMPAND BE THOROUGHLYCONSOLIDATED WITH VIBRATORS AND TAMPED. 2.

CEMENTSLURRY SHALL BE LEFT1/ 2" LOWFROM EXISTINGSTREET SURFACE; TEMPORARY AC SHALLBE PLACEDOVER SLURRY IN ALLAREASSUBJECT TO VEHICLEOR PEDESTRIANTRAFFIC. 3.

ALLOWSLURRY FIVE ( 5) DAYSTO CUREBEFORE PLANING. 4.

COLDPLANE EXISTING AC PAVEMENTTO A MINIMUMDEPTH OF ONE- HALF THICKNESSOF EXISTINGAC - NOT TO EXCEED2". 5.

A TACKCOAT OF ASPHALTICEMULSION OR PAVINGASPHALT SHALL BE APPLIEDTO ALL SURFACES. 6.

AC SURFACECOURSE SHALL BE PLACEDUSING A SPREADERBOX OR PAVINGMACHINE AND SHALL BE DENSIFIED / FINISHED PER 2012 GREENBOOK302- 5. 6. 1 & 302- 5. 6. 2. 7.

AC RESURFACINGSHALL BE SEAL COATED WITH EMULSIFIEDASPHALT AND COVEREDWITH SAND UNLESS WAIVED BY CITY ENGINEER. Revision__
By ApprvdDate CITY
OF VISTANew
DS 10/ 89 STANDARD DRAWING Updated
GL TS 05/ 07/ 12 CITY ENGINEER, DATE TRENCH
RESURFACINGRCE 55075 STANDARD
NOTES NUMBER:

SRF- 08B FULL
LANE WIDTH 12 FT. MIN. ASPHALT
CONCRETE 26"
TO 48" FINISH COURSE SEE
GS- 28 LIMIT
OF 3" GRINDLIMIT
OF 3" GRIND - EXISTING AC ( TYP.) TYP.)

AND BASE SAWCUT

LINE TYPICAL
ASPHALT CONCRETE 7ABASE

COURSE,
SEE GS- 28 GGREGATE

BASE PIPE
BEDDINGAND BACKFILLPER 0

PROJECTPLANS, SPECIFICATIONS, AND
CITY STANDARDS. NOTES:

1. THEDETAILSHOWN ABOVE APPLIES TO TRENCHWIDTHS FROM 26 INCHESTO 48 INCHES. 2.

EXISTINGA. C. SHALLBE CUT AND REMOVEDIN SUCHA MANNERSO AS NOT TO TEAR, BULGE OR DISPLACEADJACENT PAVEMENT. EDGES SHALL BE CLEANAND VERTICAL. ALL CUTSSHALL BE PARALLELOR PERPENDICULAR TO STREETCENTERLINE, WHEN PRACTICAL. 3.

BASEMATERIALSHALL BE REPLACEDTO DEPTHOF EXISTINGBASE OR A MINIMUMOF 6 INCHES, WHICHEVERIS GREATER. A. C. MAYBE SUBSTITUTEDFOR BASE MATERIALAT THE CITY ENGINEER'S DISCRETION. 4.

WHENTHE EDGE OF THE GRIND AREA IS WITHIN24 INCHESOF EDGEOF PAVEMENT, ANY STRUCTURE, AN ADJACENT

TRENCH PATCH, OR OTHERPAVING JOIN LINE, THE GRINDAREA SHALL BE EXTENDEDTO THE EXISTING STRUCTUREOR JOINLINE. 5.

WHENTHE EDGE OF THE GRIND LIES WITHIN A WHEELPATH, THE GRIND AREA SHALL BE EXTENDEDTO THE NEAREST LANE LINE OR EDGEOF PAVEMENT. 6.

IN AN EFFORTTO MAINTAINA STREET'S EXPECTEDLIFESPAN, RETURN THE STREETTO THE SAMEOR SIMILAR

CONDITIONAS BEFORETHE TRENCHINGTOOK PLACE, AND TO MEETCITY OF CARLSBADAND GREENBOOK STANDARDS PERTAINING TO ROADSMOOTHNESS: A)

IF THETRENCHIS LOCATEDWITHIN A BIKELANE, THEN THE ENTIREBIKE LANE WIDTH SHALL BE COLD PLANED 1- 1/ 2" MINIMUMAND OVERLAYED1- 1/ 2" MINIMUM. B) IF THETRENCHIN WITHIN24" OF A CONCRETESTRUCTURE ( I. E. LIP OF GUTTER, VAULT, ETC.) THEN THE AREA BETWEENTHE TRENCHAND THE CONCRETESTRUCTURE SHALL BE COLDPLANED1- 1/ 2" MINIMUMAND OVERLAYED1- 1/ 2" MINIMUM. C)
IF THETRENCHIS LOCATEDLONGITUDINALLYWITHIN THE TRAVELLANE OF A PRIME, MAJOR, OR 4- LANECOLLECTORSTREET, THEN THE ENTIRELANE SHALL BE COLD -PLANE 1- 1/ 2" MINIMUMAND OVERLAYED1- 1/ 2" MINIMUM. HOWEVER, THE CITY ENGINEERMAY, ON A CASE -BY - CASEBASIS

AND AT HIS/ HER SOLE DISCRETION, MODIFY THE REQUIREMENTTO COLDPLANE AND OVERLAY THE ENTIRELANE BASED ON THE FOLLOWINGCRITERIA: ( 1) EXISTINGCONDITION OF THE PAVEMENT; ( 2) FUTUREREHABILITATIONSTRATEGIES AND SCHEDULE; (3) DEPTHOF TRENCH; (4) OTHER TRENCH WORK IN THEAREA; (5) EXISTENCEOF A COMPARABLETRENCH PAVING TECHNOLOGY OR TECHNIQUESWHICH WOULD ACHIEVE THE DESIREDROAD SMOOTHNESSAND LONGEVITY; AND ( 6) OTHERSITE - SPECIFICCONDITIONS AND FACTORSDEEMED BY THE CITY ENGINEER TO ALLEVIATETHE NEED TO COLD -PLANE AND OVERLAYTHE ENTIRELANE. REV.

APPROVEDDATE CITY OF CARLSBADTRENCH
RESURFACING4/
29/2022ASPHALT

CONCRETE PAVEMENT CITY

ENGINEERDATE SUPPLEMETAL
FOR
TRENCHWIDTHS FROM 26" TO 48" STANDARDNNO. GS- 26 GS- 25 TO GS- 29 TRENCHRESURFACING (CITY OF CARLSBAD) N. T.

S. I A ww.
0 0
J N
Y
U
m _j
w b\ 0 o
m W N
0 x
U
zwWo
z
N
O o w
z
o
a-
w
w Wm
N3/
4"

CRUSHEDROCK ENCASEMENT
NOTES: TEMPORARY
TRENCH

BOX OR SHORINGWHEREREQUIRED

BY SOIL CONDITIONSAS DETERMINED BY
GEOTECHNICAL ENGINEERr MAX.

SLOPEPER PROJECT TRENCHWIDTH =
GEOTECHICAL ENGINEER MINIMUM = ( PIPE
OD NIC BELLS) +
16" ONLY IN WET GROUNDMAXIMUM = (PIPE
OD CONDITIONS, WRAP NIC BELLS) +
24" BEDDING W/ NON- WOVENGEOTEXTILEMIRAFI
140N OR SIMILAR

WITH OVERLAP EQUAL

TO WARNING THE
TRENCH WIDTH a PIPE
T A
P E O. D.

BELLM AX. DEPTHOF TEMPORARY TRENCH
04 z
1: 2
BOX
PER
ASTM D2321 TOP OF
P I P E 6" MIN.

BENEATHPIPE OR 2"
MIN. BENEATHBELL WHICHEVER

IS GREATER FIRM
TRENCH

BOTTOM TO BE
CREATEDUSING 3/ 4"
CRUSHEDROCKIN SIZE. BRIDGE

NATIVE SOILS UNTIL

FIRM SUBGRADE FORMS (
SEE NOTE 3).

THICKNESSAS RECOMMENDED/ REQUIRED

BY GEOTECHNICAL
ENGINEER. 1.

ALL
PIPINGSHALL BE INSTALLED IN ACCORDANCE W/ ASTM D2321 (STANDARDPRACTICE FOR UNDERGROUND INSTALLATION OF PIPE FOR SEWERS & OTHERGRAVITY - FLOW APPLICATIONS). 2. (*) INDICATES MINIMUM RELATIVE COMPACTION. 3. UNDISTURBED
NATIVESOIL IS ANTICIPATEDTO BE 85% RELATIVECOMPACTIONAT TRENCH BOTTOM, WHICH IS SUITABLE AS " FIRM TRENCHBOTTOM." IF THE TRENCHBOTTOMIS LESS THAN85% RELATIVECOMPACTION, CONTRACTOR SHALL PLACE CRUSHED ROCK AS INDICATEDBY TRENCH DETAIL. 4. PROVIDE COMPACTIONEFFORT SUITABLE TO UNIFORMLY LOADTHE ENTIRE CIRCUMFERENCEOF THE PIPE. RevisionBy I ApprvdDateCITY OF
VISTA New SJ
Gm STANDARDDRAWING CITY ENGIN

STANDARDSEWER
PIPE ZONE RCE 55075 ER, DATE

AND TRENCH
BACKFILLDRAWING SWR- 11
SWR- 11

STANDARDSEWERPIPE ZONE AND TRENCH BACKFILL (CITY OF VISTA) FULLROAD WIDTH - GUTTER TO GUTTER 48, ASPHALT

CONCRETE

FINISH COURSE
n SEE
GS-28 LIMITOF
3" GRINDLIMITOF
3" GRIND - EXISTINGAC ( TYP.) TYP.) AND

BASE SAWCUTLINE

ASPHALT CONCRETE TYPICAL BASE
COURSE, SEE GS- 28 AGGREGATEBASE

PIPE BEDDING
AND BACKFILL PER 0 PROJECT
PLANS,

SPECIFICATIONS, AND CITY
STANDARDS. NOTES: 1.

THE
DETAILSHOWNABOVE APPLIES TO TRENCH WIDTHSGREATER THAN 48 INCHES. 2. EXISTING A. C. SHALLBE CUT ANDREMOVEDIN SUCH A MANNERSOAS NOT TO TEAR, BULGEOR DISPLACEADJACENT PAVEMENT. EDGES SHALL BE CLEAN AND VERTICAL. ALL CUTS SHALL BE PARALLEL OR PERPENDICULARTO STREET CENTERLINE, WHEN PRACTICAL. 3. BASE MATERIALSHALL BE REPLACEDTO DEPTH OF EXISTING BASEOR A MINIMUMOF 6 INCHES, WHICHEVERIS GREATER. A. C. MAYBE SUBSTITUTEDFORBASE MATERIALAT THE CITYENGINEER'S DISCRETION. 4.

IN

AN EFFORTTO MAINTAIN A STREET' S EXPECTED LIFESPAN, RETURN THE STREET TO THE SAMEOR SIMILAR CONDITION

AS BEFORE THE TRENCHINGTOOKPLACE, AND TO MEET CITYOF CARLSBADANDGREENBOOK STANDARDS PERTAINING TO ROAD SMOOTHNESS: A) IF

THE TRENCHIS LOCATED WITHINA BIKE LANE, THEN THE ENTIRE BIKE LANE WIDTH SHALL BE COLD PLANED1- 1/ 2" MINIMUMANDOVERLAYED1- 1/ 2" MINIMUM. B) IF THE TRENCHIN WITHIN 24" OF A CONCRETESTRUCTURE (I. E. LIPOF GUTTER, VAULT, ETC.) THEN

THE AREA BETWEENTHE TRENCH AND THE CONCRETESTRUCTURESHALL BE COLD PLANED 1- 1/ 2" MINIMUMANDOVERLAYED1- 1/ 2" MINIMUM. C) IF
THE TRENCHIS LOCATED LONGITUDINALLYWITHIN THE TRAVEL LANE OF A PRIME, MAJOR, OR 4- LANECOLLECTORSTREET, THEN THE ENTIRELANE SHALL BE COLD - PLANE1- 1/ 2" MINIMUMAND OVERLAYED1- 1/ 2" MINIMUM. HOWEVER, THE CITY ENGINEERMAY, ON A CASE -BY -

CASE BASISAND AT HIS/ HERSOLEDISCRETION, MODIFYTHE REQUIREMENTTO COLD PLANE AND OVERLAYTHE ENTIRE LANE BASED ON THE FOLLOWINGCRITERIA: (1) EXISTING CONDITION OF THE PAVEMENT2 FUTURE REHABILITATIONSTRATEGIESAND SCHEDULE; ( 3) DEPTH OF TRENCH; (4) OTHER TRENCHWORK IN THE AREA; (5) EXISTENCEOF A

COMPARABLETRENCHPAVING TECHNOLOGYOR TECHNIQUES WHICHWOULD ACHIEVE THE DESIRED ROAD SMOOTHNESSAND LONGEVITY; AND ( 6) OTHER SITE -SPECIFIC CONDITIONSAND FACTORS

DEEMEDBY THE CITYENGINEERTO ALLEVIATE THE NEED TO COLD - PLANEAND OVERLAYTHE ENTIRE LANE. REV. APPROVED

DATE CITY OF CARLSBADTRENCHRESURFACING
a DATE
z

ASPHALT

CONCRETE

PAVEMENT CITY ENGINEER

DATE TAL FOR
TRENCH
WIDTHSGREATER THAN 48" STANDARDUNNo. GS- 27 NOTES: 1. A TACK
COATOF ASPHALTICEMULSIONOR PAVING ASPHALT SHALLBE APPLIED TO EXISTINGA. C.

OR P. C. C. CONTACTSURFACESPRIORTO RESURFACING PER SSPWCSECTION 302- 5.

2. ASPHALTCONCRETE
RESURFACING - BASE COURSE: a. MINIMUMTOTAL
A. C. THICKNESSSHALLBE ONE INCH GREATERTHAN EXISTINGb. AC SHALL BE B- PG 64- 10 OR III B2- PG 64- 10 OR III B3- PG 64- 10 FOR BASE COURSE. IF APPROVED BY THECITY ENGINEER, 1/ 2" AC MIXESINCLUDINGCl- PG 64- 10, C2- PG 64- 10, III- C2- PG 64- 10 AC MIXESALSOMAY BE USED FOR BASECOURSE. III C3 AC MIXSHALLNOT BE USED FOR BASECOURSE. PG 70- 10 OR MODIFIEDASPHALTBINDER

MAY ALSO BE USED WITH ANY OF THE AC MIXESIF APPROVEDBY THE CITY ENGINEER. c. BASE COURSE

SHALL BE LAID DOWN WITHSELF PROPELLEDPAVINGMACHINEAND COMPACTEDPER SSPWC SECTION 302- 5a. 3. ASPHALTCONCRETE
RESURFACING (FINISH COURSE) a. PROVIDE 3
INCH DEEP GRINDAND A. C. FINISH COURSEC2- PG64- 10 OR III- C2- PG64- 10 OR III- C3- PG 64- 10. PG 70- 10 OR MODIFIEDASPHALTBINDERMAY ALSO BE USED WITH ANY OF THE AC MIXESIF APPROVEDBY THECITY ENGINEER. b. FINISHCOURSE

FOR RESURFACINGSHALL BE LAID DOWN USINGA SELF- PROPELLEDPAVING MACHINEAND COMPACTED. c. SMOOTHNESSAND

COMPACTIONOF RESURFACINGSHALL MEETTHE REQUIREMENTSOF SEC 302- 5 SSPWCEXCEPTTHATTHE SMOOTHNESSSHALL BE DETERMINED OVER

THE LENGTH AND WIDTH OF PAVED AREAS DISTURBEDBY THE CONTRACTOR' S OPERATIONS. 4. SURFACETREATMENT
TOMATCH EXISTING PAVEMENTSURFACE ( SLURRY, CHIP SEAL, ETC.) 5. SLOUGHING OF

TRENCHUNDER PAVEMENTSHALL BE CAUSE FOR REQUIRINGADDITIONALPAVEMENTAND BASE. 6. MULTIPLETRENCHES

ONTHE SAME STREETSEGMENTWILL REQUIRE FULL WIDTHMILL AND OVERLAYTO A DEPTH OF 2 INCHES MINIMUM. MULTIPLETRENCHES INCLUDES MAIN LINE TRENCH WITH LATERALTRENCHES OR PARALLEL TRENCHES ON THE SAME STREETSEGMENT. 7.

ASPHALT CONCRETE
FINISHCOURSE MATERIAL SHALL MATCH EXISTING SURFACE ASPHALT CONCRETE MATERIAL. IF

EXISTING STREET IS SURFACED WITH MODIFIEDAC, THEN THE FINALFINISH COURSESHALL ALSO BE WITH THE SIMILARMODIFIEDAC. CONVENTIONALAC MATERIALMAY BE USED

IN THE FINAL FINISHCOURSEWITH MINIMUM TOTAL AC THICKNESS ONE INCH GREATER THAN THE EXISTING AC FINISHCOURSE IF REQUESTEDAND APPROVEDBY THE CITY ENGINEER.

REV. I APPROVED
DATEICITY OF CARLSBAD4/ 29/ 2022

NOTESFORASPHALT

CONCRETECITY ENGINEER DATE TRENCHRESURFACING SUPPLEMENTAL GS- 28

STANDARD
NO. N.T. S.

C NO. DESCRIPTIONCITY
DATE VID DATE 55075 APPROVED CHANGES ENGINEER
OF WORK RCE 3/ 20/ 24
06/30/ 2024
EXP.LIC. DATE
DATE OFESSIONqz No.
55075
yt
Exp. 06-
30- 2 r CIVI TF OF
C
AVZF N. T.S.

I B 0 z Q
M4.
0 BUENA

SANITATIONDISTRICT
IMPROVEMENTPLANS FOR:

EMERGENCYMODIFICATIONSBUENAOUTFALL FORCE

MAIN, PHASE III STANDARDDETAILS I

PPROVED SEE TITLE
SHEET
55075 06/ 30/ 24 GREGMAYERRCE
EXPIRES DATI BENCH MARK: DATUM:

SEE SHEET 1
OF 52 - TITLESHEETSHEET 31 OF52
DRAWINGNO. 4505
06/24/2025
C10
199 of 352
1 / 4" Steel Plate welded to top
burrs removed).
4" Diameter Steel Pipe
1/ 2" Expansion Joint
Back of curb or joint
15" DiameterSteelPipeSleevein walk----,
Concrete to be same
as walk
Four Link;
Three Linl
Make bowl shaped r
in concrete to acco
three links of chain
5" Diameter Steel Pipe
z
18„
9„ 9„
18" Diameter

HASP DETAIL
NOTES

1. Chain to be 1/ 4" proof coil chain galvanized steel.

Weld four links to post and three links to pipe sleeve.

2. All metal to be hat — dip galvanized after fabrication.

Revision By ApprovedDate SAN [ DIED® REGIONAL STANIPAR3 I1RAV\ 1ING ORIGINAL Kercheval 12 75
Revised D. Gerschoffe 09/ 15
Reviewed D. Gerschoffer 10/ 18

DEMOUNTABLE POST
Reviewed I RPIS. Engeda 03/ 22
M- 16 DEMOUNTABLE POST ( SDRS)

LEGEND ON PLANS
O

RECOMMENDED BY THE SAN DIEGO

REGIONAL STANDARDS COMMITTEE
Oy,. Yf 1 9?2
hairperson R. C. E. 52241 - Date

DRAWING
M- 16NUMBER

ZY PACK

N-SHRINK
ROUT
PIPE 0 PER PLANS

OUTER FACE OF WALL,

SEE STRUCTURAL PLANS

FOR REINFORCING

WALL PENETRATION ( DRY PIT)

I PIPE PENETRATION DETAIL
N. T. S. I A

BLOCKS WHERE

DIRECTED
BEND
CROSS
e'
x
sti U I-
w o
s`
O
18" MINIMUM T

INTO NATIVE MATERIAL

REDUCER

SEE NOTE
2 BELOW
CAP/
PLUGUSE SHORT LENGTH \
e•

END CAP
s
WIDTH

TEE PLAN

STREET/ GROUND

SURFACE

TEE ELEVATION
NOTES:
1) FOR ADDITIONAL THRUST BLOCKS, ANCHOR BLOCKS AND NOTES SEE WT- 01 ( 2 OF 3) & ( 3 OF 3) 2) THE ANCHOR BLOCKS ON VERTICAL BENDS REQUIRE AGENCY APPROVAL R2VISIOnByIApprovedDate SAN DIEGO REGIONAL STANDARD DRAWING

RECOMMENDED DIEGO

REGIONAL STANDARDS COMMITTEE
e3 ? f 1° 21
ORIGINAL Kercheval 12 75
Reviewed MR B. KNOLL 10/ 15

CONCRETE THRUST AND ANCHOR

BLOCK INSTALLATIONS
Reviewed MR B. KNOLL 10/ 18 Chairperson R. C. E. 52241 Date Reviewed RP S. Engeda 03/ 22 DRAWING
NUMBER WT- 01 (, OF 3)

VALVE SUPPORT BLOCK
VALVE
SIZE

DIMENSION
A"

DIMENSION
B"
4" 12" 12"
6" 12" 12"
8" 13" 14"
10" 14" 16"
12" 15" 18"
DIMENSION " C" = TRENCH WIDTH

PLUS TWO TIMES THE PIPE DIAMETER
111i111:0- L—IN I. 7_ 1i, NP.[• 1: S 7[• Z•1: 01

MINIMUM BEARING AREA IN SQUARE FOOT
SEE NOTE 2
MAIN TEES 90' 45' 221'

SIZE BEND BEND BEND
4" 4 5 3 1. 5
6" 8 10 5 2. 5
8" 12 16 9 4. 5
10" 17 24 13 6. 5
12" 24 33 19 9. 5

VALVE SUPPORT
PLAN

BOTTOM OF

TRENCH TYP
s.

DIMENSION " A"

CLEAR BELL OR
FLG, SEE NOTE 5

VALVE SUPPORT

ELEVATION

CONCRETE BLOCK

I TYPICAL
DIMENSION " C"
NOTES:
1) REFER TO AGENCY SPECIFICATIONS WHERE APPLICABLE
2) BEARING AREA BASED ON SOIL BEARING VALUE OF 1500 PSF AND 225 PSI LINE PRESSURE AND A MINIMUM OF 36" COVER
FOR BEARING= 1000 PSF, 1. 5 x AREA SHOWN
FOR BEARING= 500 PSF, 3. 0 x AREA SHOWN
3) DESIGN ENGINEER SHALL DETERMINE SIZES, REFER TO AGENCY SPECIFICATIONS FOR THRUST

AND ANCHOR BLOCK SIZING
4) THRUST BLOCKS SHALL BE CENTERED ON THE FITTING SO THAT THE BEARING AREA IS

EXACTLY OPPOSITE THE RESULTANT DIRECTION OF THRUST
5) CONCRETE SHALL BE PLACED SO THAT FITTINGS AND VALVES WILL BE ACCESSIBLE FOR

REPAIR OR REPLACEMENT
6) ALL THRUST AND ANCHOR BLOCKS SHALL BE POURED AGAINST WETTED UNDISTURBED SOIL 7) FOR MINIMUM CONCRETE CURING TIME REFER TO AGENCY SPECIFICATIONS 8) FOR ADDITIONAL THRUST BLOCKS SEE WT- 01 ( 1 OF 3) & ( 3 OF 3)

ED BYSAN
Revision By Approved Date SAN [ DIEGO REGIONAL STANDARD [ DRAVYING REGONALNSTANDAR SECOMMDTIlEEE ORIGINAL Kercheval 12 75
Reviewed MR B. KNOLL 10/ 15
W P" me
Reviewed MR B. KNOLL 10/ 18 CONCRETE THRUST AND ANCHOR Chairperson R. C. E. 52241 Date Reviewed RP S. Engeda 03/ 22 BLOCK INSTALLATIONS DRAWING NUMBER WT- 01 ( 2 of 3)
WT- 01 CONCRETE THRUST AND ANCHOR BLOCK INSTALLATIONS ( SDRS) S. S. WEDGE
OFFSET 304 S.S. F
6'-0" MAX
2" STRIP OF
RUBBER
FABRIC
N. T. S. I C I PIPE HANGER DETAIL

CACE OF WALL

DIMENSIONS
PIPE
SIZE A

HOLE SIZE
B
BOLT
SIZE
3 91/ 2 7/ 16 3/ 8
4 10 9/ 16 9/ 16 1/2
5 1111/ 16 9/ 16 1/2
6 14 3/8 9/ 16 1/2
8 16 7/ 16 9/ 16 1/2
10 211/ 2 13/ 16 3/4
12 24 7/ 8 13/ 16 3/4
18 31 13/ 16 3/ 4
24 37 1 11/ 16 1

SERVICE SADDLE TAP

SMITH & BLAIR, OR EQUAL)
I
DRAIN
S.S2" BALLVALVE (TYP.)
DIAPHRAGM SEAL ( TYP) ( AS REQ.)
S. S2" W4" REDUCER (ASREQ-D)
1"
1" TAPPED ONNECTIO ( PVC) I S.S. ( TYP.)
PS

PIPE PER PLAN

PLAN VIEW

PRESSURE TRANSDUCER

PULSATION DAMPENER ( TYP)

PRESSURE SWITCH
SCALE: NTS
N. T. S. D PRESSURE SWITCH/ TRANSDUCER DETAIL
NO. DESCRIPTION CITY DATE

APPROVED CHANGES
VID DATE 55075 06/ 30/ 2024
ENGINEER OF WORK RICE EXP. LIC. DATE
NITS
PLAN
NITS
24" MINIMUM ( TYP)
z
N
I

TEE WITH GATE VALVES GATE WELL TYPICAL
SEE WV- 01 & WV- 02

IE EDGEOF TRENCH

TYPICAL

BUTTERFLY

VALVE ( TYP)

ACTUATOR
TYPICAL -- — — — --

BEARING SAND BAGS
AREA " B" I —

TYPICAL MASONRY SUPPORT

TYPICAL

BEARING BLOCKS, TYPICAL

PLAN AREA A TYP SECTION WITH REDWOOD

WEDGES AS REQ' D

NITS NITS

TEE WITH BUTTERFLY VALVES ON MAIN
F-Ill
PLAN

GATE WELL TYPICAL
SEE WV- 01 & WV- 5-2-
I
1111IIII
Nom
Ui''®
1 TEE WITH BUTTERFLY VALVES
NOTES:
1) BEARING AREA " B" MUST BE EQUAL TO OR GREATER THAN THE AREA REQUIRED FOR A 90'

ELBOW INSTALLATION
2) INSTALL SAND BAGS AROUND BUTTERFLY VALVE ACTUATOR TO ISOLATE IT FROM CONCRETE 3) BFV' S INSTALLED AT CROSSES OR TEES REQUIRE A FLANGED DUCTILE IRON SPOOL TO BE

INSTALLED BETWEEN THE FITTING AND VALVE IN ACCORDANCE WITH THE AGENCY

SPECIFICATIONS
RevisionBy ApprovedDate

RECOMMENDED BY THE SAN DIEGO
SAN [ DIEGO REGIONAL STANIDARID [ DRAWING REGIONAL STANDARDS COMMITTEE ORIGINAL Kercheval 12 75
Reviewed MR B. KNOLL 10/ 15
Reviewed MR B. KNOLL 10/ 18 CONCRETE THRUST AND ANCHOR Chairperson R. C. E. 52241 Date Reviewed RP S. Engeda 03/ 22 BLOCK INSTALLATIONS DRAWING WT- 01 ( 3 OF3) NUMBER

SECTION A - A
SCALE: NTS
NOTES:

1. DIAPHRAGM SEALS TO BE INSTALLED ON ALL PROCESS PIPING UNLESS FLUID IS POTABLE/ RECYCLED WATER.

2. COORDINATE INSTALLATION OF ISOLATION BALL VALVE TO PROVIDE

ADEQUATE CLEARANCE FROM PIPE IN OPEN POSITION
N. T. S. E
G
Ess l
D Mq` F
c
No. 55075
3/ 20/ 24 * Exp. 06-30-2
DATE
N. T. S. I B
W
0 LL_
W
V J
z
Q
CL
O
O
M4. 1

BUENA SANITATION DISTRICT
IMPROVEMENTPLANSFOR: EMERGENCY MODIFICATIONS

BUENA OUTFALL FORCE MAIN, PHASE III
STANDARD DETAILS 11
PROVED
SEE TITLE SHEET 55075 06/ 30/ 24
GREG MAYER RCE EXPIRES DA1
BENCH MARK: DATUM:

SEE SHEET 1 OF 52 — TITLE SHEET
SHEET 32 OF52
DRAWING NO.
4505
06/24/2025
C10
200 of 352
MINIMUM 1" AC
3'
OVER 11" CONCRETE 2, REMODEL EXISTING SEWER
F_
MANHOLE ( SEE NOTE 2 BELOW)

EXISTING GRADE

ADJUSTMENT OF EXISTING

MANHOLE SHOULD NOT CAUSE

PROPOSED GRADE

THE TOTAL LENGTH OF THE
RISER TO EXCEED 18" MAXIMUM
w N w^. X 11rr
w V) Z Q ` . . m m m
0 wi•1eo
z Z z- : 4 12" 12Q
wNw
L' "
rOi REMOVE ANY EXISTING STEPS AND
z REPAIR ANY DAMAGE TO WALL
0 w
U
Zo
C9 U
z
V) 3
1 w
X z
w
LEVEL
a 4' OR 5' 0
N ( SEE NOTE 4)
z
v7
Xw
bi

Q SXHSEIL F EXISTINGSEWERMAIN
m
z EXISTINGCHANNEL
I- N
w
NOTES:

1. SALVAGEABLE MATERIALS SHALL BE DELIVERED TO THE CITY OF VISTA PUBLIC WORKS YARD.

2. REPLACE EXISTING 2' 0 RISERS, FRAMES, CONES AND COVERS WITH NEW 3' 0 RISERS, FRAMES, CONES AND COVERS. RECONSTRUCT EXISTING SEWER MANHOLES PER SAN DIEGO REGIONAL STANDARD DRAWINGS:

SM- 01 ( 48" 0 PRECAST MANHOLE INSTALLATION),
SM- 02 ( 60" 0 PRECAST MANHOLE INSTALLATION) AND
M- 3 ( 36" MANHOLE FRAME AND TWO CONCENTRIC COVERS HEAVY DUTY).

3. APPLY NEW COAT OF HIGH — STRENGTH NON — SHRINKING MORTAR AND CONCRETE TO THE EXTERIOR WALLS. LEGEND

4. CONSTRUCT EXISTING SEWER MANHOLES PER SAN DIEGO REGIONAL STANDARD DRAWINGS:

SMH
SM- 01 ( 48" 0 PRECAST MANHOLE INSTALLATION),
SM- 02 ( 60" 0 PRECAST MANHOLE INSTALLATION)
Revision _ By ± 2pryd Date

CITY OF VISTA
New TH 07/ 08/ 93 STANDARD DRAWING
Updated TR SS 04/ 19/ 08 CITY ENGINEER, DATE
USEWER
MANHOLE RCE 55075 Updated
TR GM 01/ 31/ 13 RECONSTRUCTION
NUBIER: SWR-33 SWR- 33

SEWERMANHOLERECONSTRUCTION (CITY OF VISTA) SUPPORTON
PIPE SUPPORTAT FLANGE FLANGEO.

D. 3/ 8"

PLATEDRILLEDTO GS U-

BOLTANDI MATCH FLANGE

BOLTS HARDWAREGRINNEL (
2)- BOLTS MIN. FIG. 137
OR EQUALOf W
II
Z_
CV
1 /
4 ROUNDCORNERS

AND EDGES
3/ 8"
PLATE, WIDTHEQUAL TO PIPE 1/ 4
FLANGEO. D. ROUNDEDCORNERS & EDGES 3"
STD.

STEEL5/ 8" THROUGHBOLTPIPE, 3"

LONG W/NUT &

LOCKWASHERMALLEABLEIRON
REDUCER 21/
2" EXTRASTRONGSTEEL PIPE (

MIN) Q ATTACH
DIRECTLY TO BASE PLATEuj WHEN
HEIGHT
LESS THAN 9" PLUS PIPEO.

D./ 2 4)- TACK
WELDSAT 90a L----I
3" EXTRA
STRONGSTL. PIPE FIELDVERIFY

REQ' D INSTALLATIONLENGTH) BASE PLATE

ROUNDCORNERS

EDGES FLOOR,
WALL

OR CEILINGI
I •
I I•• e• ••Ii.' •• .
aII

GROUT OR
DRY PACK3/
4" MIN., 1 1/ 2" 2" MAX. —
1/ (TYP) PIPE SUPPORT

ANCHORBOLTS

W/ LOCK WASHERS,

DOUBLENUTTED

AT SLAB LOCATION
MEMBER

BASE PLATE
ANCHORBOLTS FLOOR 3/
8 X 9 X 9 4- 5/ 8" CEILING5/
8 X 9 X 9 4- 3/ 4" WALL5/
8 X 9 X 9 4- 3/ 4" NOTES: 1.

AS
AN ALTERNATE, IF ADJUSTMENT IS NOT NECESSARY, DELETE21/ 2" PIPEANDREDUCERAND WELD 3" STEEL PIPEDIRECTLY
TO 3/ 8" PLATEATTACHEDTO PIPE FLANGE. 2. HOT
DIP GALVANIZEAFTERFABRICATION. DO NOT
CUTOR WELDAFTERGALVANIZING. 3. FIG.
264 AS APPROVEDBY ENGINEER. FORH >
T- 0", CONTRACTORSHALLUSE GRINNELLN. T.

S N. T.

S. I A NOMINAL4"

THICKNESSAREATO

BE REMOVEDEXISTINGSCORE
MARK 5', OR FROMJOINTIN EXISTINGJOINT PANEL, WHICHEVER

IS LESS U I

SIDEWALK

PLAN I EXISTING SCORE
MARK ­,, AREA TO

BE REMOVEDEXISTINGJOINT

SIDEWALK SECTION
AKtA IU
DC KLMUVLUmill. 5% OR

FROMJOINTIN PANEL, WHICHEVER

IS LESS FROMEXISTING

JOINT OR EDGE

OF CURB EX CURB
LINE
H U
H
U
GUTTER
LINE

CURB PLAN

STING JOINT

OR EDGE AREATO
BE REMOVED5' MIN. FROMEXISTINGEXISTINGJOINT

OR EDGE EXISTINGSCORE
MARK 5' MIN. JOINTOR EDGE OF PAVEMENTd = d
U U

PAVEMENT SECTION

REMAINING EDGE

TO BE SMOOTHAND
TRUE WITH 1- 1/
2" MIN. NO SHATTER

E CONCRETE
T
NOTE: TO
BE
REMOVEDj SAW CUT

1. SIDEWALK
CROSSSLOPE SHALL BE 2% MAX. G 2.

WHEN
DISTANCEFROM " AREA TO BE REMOVED" TO EXISTING JOINT, EDGE OR SCORE MARK IS LESS THANMINIMUMSHOWN, "AREA TO BE REMOVED" SHALLSECTION BE EXTENDED TO JOINT, EDGEOR SCORE MARK. SHOWINGCUT ReVision B
Approved DateSAN DIEGO

REGIONALSTANDARD DRAWING RECOMMENDED BY

THE SAN DIEGOREGIONALSTANDARDS
COMMITTEE s zr
zo2zORIGINALKERCHEVAL
12/ 75 UPDATEDCV
MR/ CV 11/ 11 CONCRETECURB,

GUTTER, SIDEWALKAND

PAVEMENT REVIEWEDCV
CV 12/ 15 ChairpersonR. C. E. 52241DateReviewed RP
S. Engeda03/ 22 REMOVAL REMOVAL

AND REPLACEMENTDRAWINGNUMBER
G-
11 CONCRETECURB, GUTTER, SIDEWALKAND PAVEMENT REMOVALAND PLACEMENT ( SDRD) SAW CUT

AND MILL SURFACETO A DEPTHEQUALTO STEEL PLATECOVER THICKNESS ( SEE NOTE 10ON STANDARDDRAWINGSRF- 11 B) NON-SKID
COATING (SEE NOTE 11 ON STANDARDDRAWINGSRF- 118) 12" MINIMUM

STEELPLATE COVERS WITH THICKNESSAPPROPRIATETO CARRY ON ALL ANTICIPATEDLOAD ( SEE NOTE 3ON STANDARDDRAWINGSRF- 118) 17MINIMUMOPEN

TRENCHTYPICAL

CROSS SECTION
17MINIMUMOPENINGSGREATER
THAN1/
4"

SHALL BE

FILLEDWITHCOLD M
I X

A S P H
A L T MATERIALRevisionI t3v
I
Apprvd DateCITYOFVISTA New
TR SS 11/
30/ 08 STANDARDDRAWINGTEMPORARYSTEEL PLATE CITY

ENGINEER, DATE RCE
55075 COVERS NUMBER:

SRF- 11A

TEMPORARY STEEL PLATECOVERS (
CITY OF VISTA) C NO. DESCRIPTIONICITY

APPROVED

CHANGES DATE VID
DATE 55075
06/ 30/ 2024 ENGINEER OF WORKRCE
EXP. LIC. DATE NOTES: 1. THE CONTRACTOR
SHALL
PROVIDESUITABLESTEEL PLATE COVERS WHERE TRAFFIC MUST CROSS TRENCHES. 2. THE USE OF

STEELPLATE COVERSSHALLBE APPROVEDBY THE ENGINEERINGINSPECTION DIVISIONPRIOR TO INITIATION OF CONSTRUCTION. 3. SEE SANDIEGO
REGIONAL "GREENBOOK" SUPPLEMENTSUBSECTION7- 10. 5. 3 FORSTEELPLATECOVERTHICKNESSTABLE. THE THICKNESS OF THE STEELPLATE COVERSFOR TRENCH WIDTHS EXCEEDING SIXTY-THREE INCHES ( 63" 0 SHALL BE ESTABLISHEDIN AN ANALYSISCOMPLETED BY A LICENSED PROFESSIONALCIVILORSTRUCTURAL ENGINEER REGISTEREDIN THE STATE OF CALIFORNIA. THE ANALYSIS SHALLBE BASED ON A- 36 GRADE STEELWITHHS20-44 TRUCK LOADINGPER THECALTRANSBRIDGE DESIGNSPECIFICATIONSMANUAL AND A MAXIMUM STEEL PLATE COVERDEFLECTION OF 1/ 7, WHEN EXPERIENCINGSAIDLOADING.

FOR SITUATIONS WHERE MULTIPLE LAYERSOF STEEL PLATE COVERS ( OR STACKED STEEL PLATE COVERSDARE TO BE EMPLOYED, THE SEAMS (I. E. THE INTERFACEBETWEENTHESTEELPLATE

COVERS SIDE - BY - SIDE) OF THE UPPERLAYER SHALLBE PLACED PERPENDICULARTO THE SEAMS OF THE UNDERLYINGSTEEL PLATECOVERS. 4. TEMPORARYSTEEL PLATE COVERINSTALLATION SHALL NOT EXCEED FOUR ( 40 CONSECUTIVEWORKINGDAYS. 5. THE TOPSIDE OF

THE STEEL PLATE COVERSSHALL BE FLAT AND FREE OF ANY CLIPS, CHAINS, ATTACHMENTS, WELDMENTSOR SURFACE IRREGULARITIES. 6. STEELPLATE COVERS
WITH A PERMANENTDISPLACEMENT (I. E. DISPLACEMENT ANYWHERE ONTHESURFACE OF THE STEEL PLATE COVERWITHRESPECTTO A PLANEFORMED BY THEOUTSIDEEDGESD THATEXCEEDS1/ 7SHALL NOT BE USEDFORSTEEL PLATECOVERINGPURPOSES. STEELPLATE COVERS THAT DEVELOP A PERMANENTDISPLACEMENT EXCEEDING1/ 7' DURING SERVICE SHALL BEREMOVEDAND REPLACED. 7. THE STEEL PLATE COVERS

SHALL BE PROVIDEDWITH THE APPROPRIATENUMBEROF KEYHOLESLOTSOR CIRCULAR HOLESFOR HANDLING, LIFTING, INSTALLATIONAND REMOVALPURPOSES. 8. THE CONTRACTORSHALL AVOID USINGA LONG SERIES OF STEEL PLATECOVERSTHAT RUNPARALLELTO VEHICULAR TRAFFICWHEELPATH. 9.

STEEL PLATE COVERS SHALL
BE INSTALLEDTO OPERATE WITH MINIMUMNOISE. W. THE PAVEMENTSHALL BE

COLD -MILLEDTO A DEPTHEQUAL TO THE THICKNESSOF THE STEELPLATECOVER AND TO A WIDTH AND LENGTHEQUALTO THE DIMENSIONSOF THE STEELPLATE COVER. ADDITIONALMETHODSOF SECURINGSTEEL PLATE COVERS MAYBEREQUIRED DEPENDINGON FIELD CONDITIONS. 11. THE SURFACEOF ALL

STRUCTTRALSTEELPLATE COVERSUSED BY THE CONTRACTORTO BRIDGE ANY EXCAVATIONIN THE PUBLIC RIGHT- OF- WAYSHALLHAVE A NONSKIDCOATING ("SKID GUARD" OREQUALD WITH A MINIMUM COEFFICIENTOF FRICTION = 0. 35 PER CALIFORNIATEST METHOD342 FOR ALL TRAFFICSTEEL PLATECOVERSWITHINTHE TRAVELEDROADWAYOF STREETS AND ALLEYS, AND A MINIMUM COEFFICIENTOF FRICTIONOF 0. 50 PER ASTM C 1028FORTHOSESTEEL PLATECOVERSIN PEDESTRIANCROSSWALKSOR ACCESSIBLEAREAS. THE NON- SKIDCOATING SHALL BE BLACK. WHEN REQUIRED BY THE ENGINEER, THE CONTRACTOR OR

PERMITTEESHALL CERIFYIN WRITINGTO THE AGENCY THATTHE STEELPLATECOVERS TO BE USED IN THE WORKMEETTHE REQUIREDSTATICCOEFFICIENTOF FRICTION. ALSO WHEN REQUIRED BY THE

ENGINEER, THE CONTRACTOR SHALLHAVE THE STEELPLATE COVERS TO BE USED IN THE WORK

TESTEDIN ACCORDANCEWITH THE ABOVE STANDARDSFOR THE VERIFICATIONOF THE REQUIREDSTATICCOEFFICIENT OF FRICTION. TESTING SHALL BE DONEBY AN INDEPENDENTLABORATORYAPPROVEDBY THE ENGINEER.

THE CONTRACTOR OR PERMITTEESHALL PAY FOR ANY COSTS ASSOCIATEDWITH THE TESTING OF THE STEEL PLATECOVERS. Revision _By Apprvd Date CITY OF VISTANew TR
SS 11/ 30/
08 STANDARDDRAWINGUpdatedTR HH 05/ 07/
12 TEMFOORARYSTEEL PLATERCE 55075EER,
DATE COVERS (NOTES) DRAWINGNUMBER:

IMF-`
1 ` 1 El
N. T. S. I D
Q OFESSION9No. 550753/
20/24 *
Exp. 06-
30-2 CIVI\- DATETF OFC
N.

T.

S. I B
A z Q OO
M4.
2 BUENA

SANITATION

DISTRICT

IMPROVEMENTPLANS
FOR: EMERGENCY MODIFICATIONS

BUENA OUTFALLFORCEMAIN, PHASE

III STANDARD DETAILS III PPROVED SEE
TITLE SHEET 55075
06/
30/ 24 GREG MAYER RCEEXPIRESDAT
BENCH MARK: DATUM: SEE SHEET
1 OF 52 —
TITLE SHEET SHEET33 OF52 DRAWINGNO.
4505
06/24/2025
C10
201 of 352
parTS IIST
lA

1. Face Seal O- Ring - C

2. Body
B
F

3. Wafer Disc O-RingD G

4. Wafer Disc

5. Wafer Disc Spring

6. Body O- Ring 710,

7. Body

8. Face Seal O-Ring
J
DImeNSIONS - INcHeS / mIIIImeTerS
SIZe a B c D e F 9 H J
in / DN in/ mm in/ mmin/ mm in/ mm
I I
in/ mm in/ mm in/ mm in/ mm in/ mm
2/ 50 1. 80/ 45 25/ 6 - 4.00/ 1011 2.03/ 51 5. 25/ 133 - 2- 1/ 2 / 65 2. 30 / 58 25/ 6 - 4. 75 / 120 2. 43 / 61 6. 00 / 152 - 3/ 80 2. 40/ 61 25/ 6 - 5. 25/ 133 3. 00/ 76 6. 50/ 165 - 4 / 100 2. 90 / 73 50 / 12 . 75 / 19 6. 75 / 171 4. 00 / 101 9. 00 / 228 . 75 / 190 22.50 / 572 45. 00 / 1143 6 / 150 3. 00 / 76 50 / 12 . 88 / 22 8. 63 / 219 5. 77 / 146 11. 13 / 28 9. 50 / 241 22.50 / 572 45. 00 / 1143 8 / 200 4. 93 / 125 75 / 19 . 95 / 24 10. 88 / 276 7. 63 / 193 13. 38 / 33 11. 75 / 29 22.50 / 572: 45. 00 / 1143 Pressure Rating for ALL Sizes - 150 PSI @ 70° F Non -Shock Consult Hayward for DN100 Wafer Check Dimension
OpeNINg / SeaIINg preSSure - pSl
SIZe
I OpeNINg preSSure WITH SprlNg
in / DN
I I
SeaIINg pressure ( WITH Or WITHOuT SprlNg)*
2/ 50 0. 5 3. 0
2- 1/ 2 / 65 0. 5 3. 0
3/ 80 0. 5 3. 0
4 / 100 0. 5 3. 0
6 / 150 0. 5 3. 0
8 / 200 0. 5 3. 0
Sealing Pressure Preliminary and subject to change
FIOW raTeS - IN gpm prODucT WeIgHTS
NOmINaI SIZe NOmINaI SIZe
IBS/ Kg
in / DN
CV
in / DN
2/ 50 93 2/ 50 1. 01 /. 46
2- 1/ 2 / 65 144 2- 1/ 2 / 65 1. 62 / . 73
3/ 80 187 3/ 80 1. 93/. 87
4 / 100 346 4 / 100 3. 73 / 1. 69
6 / 150 848 6 / 150 6. 34 / 2. 88
8 / 200 1643 8 / 200 14. 05 / 6. 37
www. haywardflowcontrol. com • 1. 888. 429. 4635

HAYWARD CHECK VALVE
victaulic. com

4. 0 DIMENSIONS
Style 908 - IPS Standard
Y
0 O Tol
O O
I`-
R_-
1 T
Z_
0110)
6 0
16" - 18" IPS & 20 - 36" IPS
0 400 - 450 mm ISO 500 - 900 mm ISO
Pipe End
IPS Size Separation3 Bolt/ Nut Weight
Actual
Outside Joint Assembled Approximate
Nominal Diameter Allowable Qty. Size R T ( dia.) X y Z Each) inches inches inches inches inches inches inches inches inches lb mm mm mm mm mm mm mm kg
16 16. 000
406. 4

0. 20

5. 1
4 7/ 8 x 5 1 /2

18. 14
461

23. 32
592

9. 50
241
158. 0

72. 0
18 20. 14
512

18. 000
457. 2

0. 20

5. 1
4 7/ 8 x 5 1 /2

25. 56
649

9. 50
241
178. 0

81. 0
20 15. 8
400. 3

1. 0

25. 4

27. 97
710

20. 000
508. 0

0. 20

5. 1
4 7/ 8 x 5 1 /2

27. 82
707

10. 00
254
247. 0
112. 0
22 17. 3
438. 4

1. 0

25. 4

30. 24
768

22. 000
558. 8

0. 20

5. 1
4 7/ 8 x 5 1/ 2

29. 48
749

10. 50
267
277. 0
125. 6
24 18. 0
457. 2

1. 0

25. 4

32. 25
819

24. 000
609. 6

0. 25

6. 4
4 1 x 6

32. 24
819

12. 00
305
366. 0
166. 0
26 18. 0
457. 2

1. 0

25. 4

33. 60
853

26. 000
660. 4

0. 25

6. 4
4 1 x6

34. 04
865

12. 50
318
390
177
28 20. 0
508. 0

1. 0

25. 4

36. 62
930

28. 000
711. 2

0. 25

6. 4
4 1 x 6

36. 48
927

13. 00
330
455. 0
206. 4
30 22. 0
558. 8

1. 0

25. 4

40. 19
1021

30. 000
762. 0

0. 25

6. 4
4 1 1/ 8 x 7

39. 92
1014

13. 50
343
525. 0
238. 1
32 24. 0
609. 6

1. 0

25. 4

40. 59
1031

32. 000
812. 8

0. 25

6. 4
4 1 1 /8 x 7

40. 70
1034

14. 00
356
594. 0
269. 4
36 22. 3
565. 4

1. 0

25. 4

43. 81
1113

36. 000 0. 25
914. 4 6. 4
4 1 1 /4 x 7

44. 76
1137

15. 25
387
726. 0
329. 3
3 The allowable pipe end separation dimension is for system layout puposes only.

VICTAULIC COUPLING STYLE 908
N. T. S
N. T. S
11 A
2 IPS

NOMINAL
SIZE
ID D L
24 24. 0000 29. 6500 15.3500
26 26. 0000 32. 1200 16.5400
28 28. 0000 34. 5900 17.3200
30 30. 0000 37. 0600 17.7200
MAX OPERATINGPRESSURE - GAS: 150PSI, WATER: 240PSI @ 73.41 F (2311Q FUSABLE FROM SDR9 - SDR17 PIPE
PE80, PE100, PE3408, PE4710
NSF, ASTM F714, F1055, D2513, D3035, D3350, AWWA C906
2 A I ICONIX ELECTRO FUSION COUPLER
1 DISCLAIMER:
1) All dimensions approximate, subject to change without notice Angle tolerance is 11 21 - All other dimensions to 111" 2) This drawing only applicable if a copy is referenced at time of order.

Without a copy of drawing, fitting construction may differ from that shown 3) Subject to ICONIX Waterworks Standard Terms and Conditions DATE:
10/ 28/ 2020
Abbotsford, B.C. ( 604) 850- 0441
Hornby, ON ( 905) 693- 0008

ALL DIMENSION IN INCHES

UNLESS OTHERWISE SPECIFIED
1 TITLE:

ELECTRO FUSION COUPLER
A%
I_1
N. T. S
0 A
2 NOMINAL AXIAL
A B C

SIZE RESISTANCE
6"- 63" 9500 LBS 7. 5000 2. 4500 1. 5600
6u IPS/ DIPS - 10u IPS/ DIPS fusible to SDR 9 to SDR 17 12u IPS/ DIPS - 6311 IPS fusible to SDR 9 to SDR 32. 5
General suggested guidelines. Please confirm with engineer for actual project requirements.* Axial Resistance based on a safety factor of 2

B I ICONIX EC RESTRAINT
1 DISCLAIMER:
1) All dimensions approximate and drawing is used as a basis only. 2) Subject to change without notice due to supply from manufacturers 3) Subject to ICON Ix Waterworks Standard Terms and Conditions DATE:
04/ 13/ 2021
Abbotsford, B. C. ( 604) 850- 0441
Hornby, ON ( 905) 693- 0008

ALL DIMENSION IN INCHES

UNLESS OTHERWISE SPECIFIED
1 TITLE:

ELECTRO FUSION FLEX

RESTRAINT
3 A
N. T. S. I C

ELECTROFUSION FITTINGS
Ns - - S

HIGH VOLUME BRANCH SADDLE

WITH BELTS
WeldableonpipeOR17 - 15.5 - 13.5 - 11 - 9.3. 9 - 73 - 7 ND1/ DtMaxHole
W
PE4710 230PSI SDR11 •
Nominal
q,ty Weight Volume Max Price
Code Diameter 6
Pack. pallet Ib/p. fF/ p,
OD1 OD2 S min L1 L D Hole `.,, , e
Each
Not x ND2)
12EICOLTLO606 6" IPS x 6" IPS 2 24 14. 850 1. 4126 8. 625 6. 625 0. 603 6. 30 12. 60 7. 87 5. 20 180 PSI $ 610.48 12EICOLTLOB06 8" IPS x 6" IPS 2 24 14. 850 1. 4126 8. 625 6. 625 0. 603 6. 30 12. 60 7. 87 5. 20 180 PSI $ 643. 04 ~ 12EICOLTL1006 10" IPS x 6" IPS 2 24 13. 200 1. 4126 10. 750 6. 625 0. 603 6. 30 12. 60 7. 87 5. 20 180 PSI $ 688.40 12EICOLTL1206 12" IPS x 6" IPS 2 24 14, 300 1. 4126 12. 750 6. 625 0. 603 6. 30 12. 60 7. 87 5. 20 180 PSI $ 763.97 12EICOLTL1406 14" IPS x 6" IPS 2 24 14. 300 1. 4126 14. 000 6. 625 0. 603 6. 30 12. 60 7. 87 5. 20 180 PSI $ 794.21 12EICOLTL1606 16" IPS x 6" IPS 2 24 13. 750 1. 4126 16. 000 6. 625 0. 603 6. 30 12. 60 7. 87 5. 20 180 PSI $ 824.45 12EICOLTL1806 18" IPS x 6" IPS 2 24 14. 850 1. 4126 18. 000 6. 625 0. 603 6. 30 12. 60 7. 87 5. 20 180 PSI $ 887.23 12EICOLTL2006 20" IPS x 6" IPS 2 24 13. 750 1. 4126 20. 000 6. 625 0. 603 6. 30 12. 60 7. 87 5. 20 180 PSI $ 1,008.16 12EICOLTL2206 22" IPS x 6" IPS 2 24 13. 750 1. 4126 22. 000 6. 625 0. 603 6. 30 12. 60 7. 87 5. 20 180 PSI $ 1,160.50 12EICOLTL2406 24" IPS x 6" IPS 2 24 14. 080 1. 4126 24. 000 6. 625 0. 603 6. 30 12. 60 7. 87 5. 20 180 PSI $ 1,374.46 \ L 12EICOLTL2606 26" IPS x 6" IPS 2 24 - - 26. 000 6. 625 0. 603 6. 30 12. 60 7. 87 5. 20 180 PSI $ 1,450. 04 12EICOLTL2806 28" IPS x 6" IPS 2 24 14. 300 1. 4126 28. 000 6. 625 0. 603 6. 30 12. 60 7. 87 5. 20 180 PSI $ 1,526.78 12EICOLTL3006 30" IPS x 6" IPS 2 24 13. 750 1. 4126 30. 000 6. 625 0. 603 6. 30 12. 60 7. 87 5. 20 $ 1,680. 27 12EICOLTL3206 32" IPS x 6" IPS - - - - 32. 000 6. 625 0. 603 6. 30 12. 60 7. 87 5. 20 $ 1,831.44 12EICOLTL3606 36" IPS x 6" IPS 2 24 17. 600 1. 4126 36. 000 6. 625 0. 603 6. 30 12. 60 7. 87 5. 20 $ 1,984.94 12EICOLTL4006 40" IPS x 6" IPS 2 24 17. 600 1. 4126 40. 000 6. 625 0. 603 6. 30 12. 60 7. 87 5. 20 $ 2,444.25 O12EICOLTL4206 42" IPS x 6" IPS 2 24 17. 600 1. 4126 42. 000 6. 625 0. 603 6. 30 12. 60 7. 87 5. 20 $ 2, 444. 25 12EICOLTL4806 48" IPS x 6" IPS - - - - 48. 000 6. 625 0. 603 6. 30 12. 60 7. 87 5. 20 $ 4,883.85 0 12EICOLTL1008 10" IPS x 8" IPS - - - - 10. 750 8. 625 0. 785 8. 66 19. 68 10. 63 6. 90 180 PSI $ 1,323. 29 12EICOLTL1208 12" IPS x 8" IPS 1 8 28. 512 2. 6652 12. 750 8. 625 0. 785 8. 66 19. 68 10. 63 6. 90 180 PSI $ 1,374.46 12EIGOLTLI408 14" IPS x 8" IPS - - - - 14. 000 8. 625 0. 785 8. 66 19. 68 10. 63 6. 90 180 PSI $ 1,526. 78 12EICOLTLI608 16" IPS x 8" IPS 2 8 26. 950 3. 8140 16. 000 8. 625 0. 785 8. 66 19. 68 10. 63 6. 90 180 PSI $ 1,526.78 M4. 3 12EICOLTLI808 18" IPS x 8" IPS - - - - 18.000 8.625 0. 785 8. 66 19.68 10. 63 6. 90 180 PSI $ 1,607.02 All measures are in inches unless otherwise mentioned.
36 PE Polyethylene Wereservetherighttovarydimensionswithoutnotice; checkthewebsiteforthe updateddimensions.

ELECTROFUSION BRAND SADDLE
D
NO. DESCRIPTION CITY
I

DATE VID
I
DATE 55075

APPROVED CHANGES ENGINEER OF WORK RCE
3/ 20/ 24
06/ 30/ 2024
EXP. LIC. DATE DATE
N. T. S. I E
ESSION9
z
Ce No. 55075
yt Exp. 06-30-2 r
Cam'

TCIVI F
OF

C AVZF BUENA

SANITATIONDISTRICT IMPROVEMENT
PLANS FOR: EMERGENCYMODIFICATIONS BUENA

OUTFALL FORCE MAIN, PHASE III STANDARD

DETAILS IV APPROVED
SEE
TITLE SHEET 55075 06/ 30/ 24 GREG

MAYER RCE EXPIRES DATE BENCH
MARK: DATUM: SEE
SHEET 1 OF 52 - TITLE SHEET SHEET
34 OF52DRAWING
NO. 4505
06/24/2025
C10
202 of 352
Features: Lightweight two- piece ( Base &
Cover) design allows easy, 360' access to
the valve
Top cover locks to the base with an
automatic internal latch
An integrated padlock tab can be used
for added security
Engineered for low - maintenance & graffiti
resistant performance
Size: Available in 3 standard sizes.

Material: Manufactured from low density
polyethylene with U.V. inhibitors for
maximum life
Finish: Available in 7 aesthetically pleasing
colors for commercial or residential
settings:

Blue
Green
Purple
Jan
Yellow
Granite Mix
Sandstone Mix
Polyethylene Valve Enclosure

PART NUMBER

ADVANTAGE SERIES
COVER

LOCKPLATE
BASE
Polyethylene Valve Enclosure
Part No. A" B"
VCAS- 1424 14" 24"
VCAS- 1830 18" 30"
VCAS- 2436 24" 36"
1 DIMENSIONS ARE IN INCHES I DO NOT SCALE DRAWING I DRW: OSBORNE I REV. A 2" AIR VAC ENCLOSURE
NA0050P07
GRADE
76in
1930mm]
COVER
OVER

DISCHARGE
123. 7in
3142mm]

41. 6in
1057mm]

36. 3in
922mm]
GRADE
641 n
2144mm]
INVERT
DEPTH
DH071- 124

GRADE MUST

SLOPE AWAY

FROM STATION
NOTE: DIMENSIONS ARE FOR REF. ONLY

CONCRETE BALLAST NOT REQUIRED
DISCHARGE: 1- 1/ 4in FEMALE PIPE THREAD
INLET: EPDM GROMMET FOR 4in DWV

PIPE ( STANDARD)
II 11
u l., l ,
II 11
II!!! 11
Ce. o n
GRINDER PUMP STATION - MODEL DH071
N. T. S.

N. T. S
C
1325 Furneaux Road, Plumas Lakes, CA. 95961
530) 742- 9675
www. placerwaterworks. com
C
IQ

ABOVE GROUND SEWAGE AIR RELEASE VALVE ENCLOSURE

KING VIEW SPACE
3/ 8" x 2" SST

LOCK GUARD

QED TOP
CE

RECESS LOCK DETAIL A

ESSED LOCK
ATION

XPANDED METAL
14 GA. STEEL

CONSTRUCTIO

DEODORIZER HANG
OPTIONAL 1" STYROFO

INSUALTION BONDED

TO SST PANEL

INLESS STEEL
A. PANEL
1 3/ 4" x 1 3/ 4" x 3/ 16" -

ROFOAM INSUALTION

DOOR FRAME

ED TO SST PANEL

ERNAL STAINLESS

EL HINGES

E FRAME
2" x 3/ 16"
4) 3/ 8" x 2 1 /2" x 5" -

ANCHOR FEET
100% ACCESS FOR

SERVICING
NU I t5:

1. ENCLOSURE TYPE: ABOVE GROUND AIR RELEASE VALVE

2. DOOR FRAME MATERIAL: 1- 3/ 4" X 1- 3/ 4" X 3/ 16" ANGLE IRON

3. EXPANDED METAL SCREEN IS NO. 9 BY 1- 1/ 2" WELDED EVERY 6"

4. DOORS WITH INTERNAL STAINLESS STEEL HINGES

5. ( 4) FOUNDATION ANCHOR PLATES 3/ 8" WITH 5/ 8" DIA. HOLE

6. PARTS SAND BLASTED TO SSPC- 5 STANDARD SURFACE PROFILE OF 2. 0 TO 3. 0 MILS A 7. POWDER COATED ZINC RICH PRIMER 2 TO 3 MILS W/ SUPER DUTY TOP COATED.

8. ALL WELDING DONE PER AWS SPECIFICATIONS.
3/ 8" CONTINUOUS

AIR GAP SPACE ALONG

ALL MEASUREMENT STATED ARE INSIDE MEASUREMEN
CAT. # WIDTH DOOR) LENGTH HEIGHT
PW/ SJARVS- 2 12 12 30
PW/ SJARVS- 3 20 20 30
PW/ SJARVS- 4 24 24 36
PW/ SJARVS- 6 28 28 48
PW/ SJARVS- 8 32 32 56
CAT#. SJARVS ABOVE GROUND ARV ENCLOSURE SEWAGE
Copyrighted 2015 Placer Waterworks, Inc. © All Rights Reserved - For Duplication Authorization may obtain thru: kkern@placerwaterworks. com *** CB: K. K 08- 14- 2015 REV. 05 8 7 6 5 4 3 2 1
A I 3" AIR VALVE ENCLOSURE
A. R. I. D- 26
Dimensions and Weight
C
B
A
6 AQuestla
Directing the Flow
FL Flanged
THR - Threaded
RN Reinforced Nylon
DI Ductile Iron
Model
Dimensions
Inch) Connection Weight ( Lbs) Orifice Area ( Sq2)
A B C RN ST ST A/ V Auto.

D- 26 2" ( 50 mm) THR 10. 1 21. 3 2" NPSM Female 18 29 3. 04 0. 0133 D- 26 2" ( 50 mm) FL 10. 1 21.6 2" NPSM Female 19 35 3.04 0. 0133 D- 26 NS 2" ( 50 mm) THR 12. 9 21.3 2" NPSM Male 19 30 3.04 0. 0133 D- 26 NS 2" ( 50 mm) FL 12. 9 21.6 2" NPSM Male 20 36 3.04 0. 0133 Cast Steel ST ST
D- 26 3" ( 80 mm) THR 19. 3 24. 2 3" NPSM Female 48 51 7787 0. 024 D- 26 3" ( 80 mm) FL 19.3 24. 2 3" NPSM Female 54 56 7. 787 0. 024 D- 26 NS 3" ( 80 mm) THR 23. 6 24. 2 3" NPSM Male 50 53 7787 0. 024 D- 26 NS 3" ( 80 mm) FL 23. 6 24. 2 3" NPSM Male 55 57 7787 0. 024 RN
D- 26 3" ( 80 mm) THR 13.7 23. 9 3" NPSM Female 33 7787 0. 024 D- 26 3" ( 80 mm) FL 13. 7 24. 4 3" NPSM Female 34 7787 0. 024 D- 26 NS 3" ( 80 mm) THR 170 23. 9 3" NPSM Male 34 7787 0. 024 D- 26 NS 3" ( 80 mm) FL 17.0 24. 4 3" NPSM Male 36 7.787 0. 024

DI ST ST
D- 26 4" ( 100 mm) FL 19.8 32. 4 4" Flanged NPSM F 96 101 12. 17 0. 048 D- 26 NS 4" ( 100 mm) FL 22. 5 33. 1 4" Flanged NPSM F 107 112 12. 17 0. 048 Vertical Cover DI ST ST
D- 26 6" ( 150 mm) FL 19. 4 32. 3 6" Flanged / Grooved 206 98. 0 2739 0.048 D- 26 8" ( 150 mm) FL 24. 1 42. 2 8" Flanged / Grooved 328 157. 0 48. 67 0.048 Horizontal Cover DI ST ST
D- 26 6" ( 150 mm) FL 20. 7 36. 7 6" Flanged / Grooved 1 220 1 106. 0 2739 0.048 D- 26 8" ( 200 mm) FL 25. 2 48. 4 8" Flanged / Grooved 1 350 1 164. 0 48. 67 0. 048 NOTE
The cover assembly with the discharge elbow can be set in four directions.

Dimension A in the picture and in the table shows the maximum product width.

This width can be reduced by changing the direction.

All product weights and dimensions are approximate,
due to the differences in flange standards, materials and variable accessories.

AIR COMBINATION VALVE N. T. S. I D I NOT USED
C
NO. DESCRIPTION CITY DATE VID DATE 55075

APPROVED CHANGES ENGINEER OF WORK RICE
3/ 20/ 24
06/ 30/ 2024
EXP. LIC. DATE DATE
N. T. S. I E
OFESSION9
z
r,- 1
No. 55075
yt Exp. 06-30-2

TFOFCAVZF
C
N. T. S. I B
0 W
M4. 4

BUENA SANITATION DISTRICT
IMPROVEMENTPLANSFOR: EMERGENCY MODIFICATIONS

BUENA OUTFALL FORCE MAIN, PHASE III

STANDARD DETAILS V

PPROVED
SEE TITLE SHEET 55075 06/ 30/ 24

GREG MAYER RCE EXPIRES DATE
BENCH MARK: DATUM:

SEE SHEET 1 OF 52 - TITLE SHEET
SHEET 35 OF52
DRAWING NO.
4505
06/24/2025
C10
203 of 352

LNGREENHECK
Building Value in Air.

Job Name: CUE- 080- VG Cut Sheet
Tag: MK 1
Quantity: 1
Printed Date: March 1, 2024
Model: CUE- 080- VG
Centrifugal Direct Drive Wall Exhaust Fan
Standard Construction Features: Aluminum housing. Centrifugal backward inclined aluminum composite for sizes 60- 95) wheel. Direct driven motor mounted on vibration isolation.

Fan Configuration
Drive type Direct
Performance
Requested Volume ( CFM) 300
Actual Volume ( CFM) 300
Total External SP ( in. wg) 0. 2
Fan RPM 1, 298
Operating Power ( bhp) 0. 03
Startup Power ( bhp) 0. 03
Air Stream Temp ( F) 70
Start- up Temp ( F) 70
Air Density ( Ibs/ ft^ 3) 0. 075
Elevation ( ft) 156
Static Efficiency (%) 33
Outlet Velocity ( ft/ min) 750
Motor
Size ( hp) 1/ 10
V/ C/ P 115/ 60/ 1
NEC FLA ( Amps) 1. 5
Min Circuit Ampacity ( MCA) 1. 9
Max Overload Production ( MOP) 15
Short Circuit Current Rating ( SCCR) 5 kA
FLA - based on tables 150 or 148 of National Electric Code 2002. Actual motor FLA may vary, for sizing thermal overload, consult factory.

MCA and MOP values shown only account for the motor, not accessories damper actuator, field supplied VFD, etc.).

SCCR is a rating on components and assemblies representing the maximum level of short- circuit current that a component or assembly can withstand without causing a fire or shock hazard. A short circuit exceeding this rating can cause catastrophic and violent equipment, component and enclosure failure.

0. 45
rn 0. 4
3 0.35

0. 3

0. 25
y 0. 2
ri 0.15

0. 1
in 0.05
n
V. VSO

0. 032 a
x

0. 028 m

0.024 w3

0. 02 a

0. 016

0. 012 =

0. 008
tZ.

Systel - 0. 004 m`
0 0 50 100 150 200 250 300 350 400 450
Volume ( CFM)
Fan curve
Brake horsepower curve
O OperatingPointSP
Operating Bhp point
Max system curve
System curve
Sound
Octave Bands( hz) LwA dBA Sones

62. 5 125 250 500 1000 2000 4000 8000
Inlet 63 69 63 56 55 53 47 39 61 50 5. 4
QIinCQ
Greenheck Fan Corporation certifies that the model shown herein

WORI CIIDE
is licensed to bear the AMCA Seal. The ratings shown are based on + L
oERTIiIED tests and procedures performed in accordance with AMCA RRTIRW Publication 211 and AMCA Publication 311 and comply with the t Ji VAD requirementsoftheAMCACertifiedRatingsProgram.TheAMCA Ll 66h,
go certified ratings seal applies to sound and air performance ratings nR onlyPerformancecertifiedisforinstallationtypeA: Freeinlet, freeoutlet. Power rating does not include transmission Iosses. Perfornance ratings do not include the effects of a ppurtenances. The sound ratings shown are loudness values in hemispherical sones at 1. 5 m ( 5 ft) in a hemispherical free field calculated per ANSI/ AMCA Standard 301. Values shown are for Installation Type A: free inlet hemispherical sone Ievels. dBA levels are not licensed by AMCA International. The AMCA Certified Ratings Seal for Sound applies to inlet sone ratings only.

Page 1 of 2 ends
← All documents from this meeting