ACTION:

____________________________
Clerk/Secretary

Department: Engineering Item No: C7
Prepared by:

Erin Adams, Administrative Programs Manager
Allison McLaughlin, Senior Engineer Meeting Date: August 12, 2025 Approved by:

Greg Mayer, Department Director
John Conley, City Manager Agenda Location: Consent Calendar

SUBJECT: CIP NO. 8343 – TRASH CAPTURE BMP DEVICE ANALYSIS – AWARD OF CONTRACT

RECOMMENDATION: Adopt City Council Resolution No. 2025- , awarding a contract to Rick Engineering Company for professional services for the Trash Capture BMP Device Analysis (CIP No. 8343).

CORRELATION TO CITY COUNCIL GOALS: Climate and Environmental Responsibility

PRIOR ACTION: On June 11, 2024, adopted City Council Resolution No. 2024 -86, adopting a Capital Project Budget for Fiscal Years 2024/25 and 2025/26 (Vote: 5-0).

STATEMENT ON THE SUBJECT: The purpose of Capital Improvement Project (CIP) No. 8343, is to control trash discharging to the ocean and surface waters through the municipal separate storm sewer system (MS4) to meet the requirements imposed by the State Water Resources Control Board (SWRCB) (Resolution No. 2015-0019) and the San Diego Regional Water Quality Control Board (SDRWQCB) (Order No. R9-2017-0077), attached as Exhibits 3 and 4, respectively. This project will analyze the City’s existing trash capture best management practice (BMP) inventory and provide engineering plans for the installation of additional BMP’s in order to achieve full compliance with these requirements.

On April 16, 2025, staff issued a Request for Proposals (RFP) for professional services for the Trash Capture BMP Device Analysis Project (CIP No. 8343). The RFP was advertised on the City’s website and the City’s electronic procurement portal, OpenGov.

The following two firms responded to the RFP:

Firm Office Location
O’Day Consultants, Inc. Carlsbad, CA
Rick Engineering Company San Diego, CA

Staff reviewed the proposals based upon predetermined criteria identified in the RFP, including experience with similar projects, understanding of project objectives and requirements, and quality of work. Staff then reviewed the schedule of rates and determined both to be fair and equitable with respect to expertise and geographic region. Staff recommend awarding the contract for professional services for the Trash Capture BMP Analysis (CIP No. 8343) to Rick Engineering Company.

AGENDA
REPORT

CITY COUNCIL

COMMUNITY DEVELOPMENT COMMISSION

SUCCESSOR AGENCY

BUENA SANITATION DISTRICT

JOINT POWERS FINANCING AUTHORITY
08/12/2025
C7
1 of 237
MEETING DATE: August 12, 2025 PAGE 2
SUBJECT: CIP NO. 8343 – TRASH CAPTURE BMP DEVICE ANALYSIS – AWARD OF CONTRACT FISCAL IMPACT: The contract has a ceiling of $684,650 over a two-year term with an option to extend it up to one additional year. Sufficient funding is budgeted and available in the Fiscal Years 2024/25 and 2025/26 Capital Improvement Budgets in CIP No. 8343, Source Appropriation Account (No. 5116650.578999.8343).

EXHIBITS:

1. City Council Resolution 2025- , awarding contract to Rick Engineering Company for professional services for the Trash Capture BMP Analysis (CIP No. 8343)

2. Contract with Rick Engineering, Inc.

3. State Water Resources Control Board Resolution No. 2015-0019

4. San Diego Regional Water Quality Control Board Order No. R9-2017-0077 08/12/2025
C7
2 of 237
0 0029213 7
RESOLUTION NO. 2025-

A RESOLUTION OF THE CITY COUNCIL OF THE CHARTERED CITY OF

VISTA, CALIFORNIA, AWARDING A CONTRACT TO RICK ENGINEERING

COMPANY FOR PROFESSIONAL SERVICES FOR THE TRASH CAPTURE BMP DEVICE ANALYSIS (CIP NO. 8343)
The City Council of the City of Vista does resolve as follows:

1. Findings. The City Council hereby finds and declares the following:

A. Pursuant to section 3.08.060B of the Vista Municipal Code, a request for proposals (RFP) was issued on April 16, 2025.

B. Two proposals were submitted in response to the RFP and were evaluated based upon the predetermined set of criteria identified in the RFP.

C. Staff recommends the selection of Rick Engineering Company as the consultant to provide professional services for the Trash Capture BMP Device Analysis (CIP No. 8343).

2. Action.

A. The contract between the city of Vista and Rick Engineering Company for professional services for the Trash Capture BMP Device Analysis is approved, and the Mayor is authorized to execute the contract.

3. Adoption. PASSED AND ADOPTED at a meeting of the City Council of the City of Vista held on August 12, 2025, by the following vote:

AYES:

NOES:

ABSTAIN:

APPROVED AS TO FORM:

WALTER CHUNG, CITY ATTORNEY
By:

APPROVED
Walter C. Chung
20250730151041
JOHN B. FRANKLIN, MAYOR
ATTEST:

KATHY VALDEZ, CITY CLERK
By:
08/12/2025
C7
3 of 237
EXHIBIT 1
Professional Services (Non-Construction) (RFP)(NPW)
1 of 9

RICK ENGINEERING COMPANY
[51960-2] 00051960 4

CONTRACT FOR PROFESSIONAL SERVICES
FOR TRASH CAPTURE BMP DEVICE ANALYSIS (CIP NO. 8343)
THIS “CONTRACT” is entered into by and between the “Parties” as of ___________________ (“Contract Date”).

1.0 THE “PARTIES”
The “City”:

CITY OF VISTA, a chartered municipal
corporation
200 Civic Center Drive
Vista, CA 92084
Working Contact: Allison McLaughlin
Billing Contact: Erin Adams
The “Contractor”
RICK ENGINEERING COMPANY, a
California corporation
5620 Friars Road
San Diego, CA 92110
Contact: Venkat Gummadi

2.0 BASIC TERMS

2.1 The “Services” to be performed by Contractor are set forth in the Request for Proposals attached as Exhibit A.

2.2 The “Required License” for the Services is: N/A.

2.3 Contractor, an entity holding the Required License, desires to enter into this “Contract” with City for the Services.

2.4 The “Project” for which the Services are required is described in Exhibit A.

2.5 Contractor has submitted to City a Proposal to perform the Services dated May 22, 2025 (“Exhibit B”).

2.6 The “Contract Ceiling Price” is: $684,650

2.7 Any references in Exhibit A or Exhibit B to “Consultant” shall mean Contractor for the purposes of this Contract.

3.0 CONTRACT TERM

3.1 This Contract shall take effect as of the Contract Date.

3.2 This Contract shall be in effect for 24 calendar months (“Term”) from the Contract Date. The Term may be extended at the City’s option for an additional 12 months, in increments of City’s choice, for a maximum Term of 36 months from the Contract Date.

3.3 City may terminate this Contract upon 30-days’ written notice to Contractor. In such event, or upon request of City, Contractor shall assemble all City documents in the Contractor's possession, put them in order for proper filing and closing, and deliver the documents to City. In the event of termination, Contractor shall be paid for work performed to the termination date. City shall make the final determination as to the portion of tasks completed and the compensation to be paid.
08/12/2025
C7
4 of 237
EXHIBIT 2
Professional Services (Non-Construction) (RFP)(NPW) 2 of 9 RICK ENGINEERING COMPANY [51960-2] 00051960 4

4.0 SCOPE
Contractor shall perform all Services including, but not limited to, the furnishing of all tools, equipment, materials, software, and supplies, and for furnishing all transportation, services, including fuel, power and water, essential communications, and the performance of all labor, work, or other operations, as may be required from time to time, in accordance with Exhibit A and Exhibit B. In the event of a conflict between the provisions of Exhibit A and Exhibit B, the provisions of Exhibit A shall control.

5.0 COMPENSATION

5.1 City shall pay Contractor for the Services to be performed as set forth in Exhibit B.

5.2 An invoice for payment shall be submitted in a form satisfactory to City. At a minimum, the invoice shall include: the purchase order number, the work order number, a description of the work performed, and a total amount.

5.3 Changes in, additions to, or deductions from the Services, including increases or decreases in any item or portion of the Services, shall be set forth in a written change order executed by City and by the Contractor which shall specify:

5.3.1 The changes, additions, and deductions to be made.

5.3.2 The increase or decrease in compensation due the Contractor, if any.

5.3.3 Adjustment in the time of completion, if any.

5.4 Contract Ceiling Price

5.4.1 In no event shall City be liable for paying more than the Contract Ceiling Price for Contractor's services rendered under this contract.

5.4.2 If it becomes foreseeable that Contractor will need to perform services such that the cumulative total of costs to City will exceed the maximum permitted by this Contract, any such cost overrun will be handled pursuant to the change order procedure in Vista Municipal Code Chapter 3.08. City and Contractor recognize that City lacks authority to exceed the cost ceiling without the express authorization of the City Council. If the maximum cost to City for this Contract is exceeded unexpectedly, payment shall be made as mutually agreeable and disputes shall be handled pursuant to this Contract, but work shall cease as soon as is reasonably feasible once the cost ceiling plus allowable change orders, if any, is exceeded.

5.5 Except as provided in Exhibit B, Contractor shall not be reimbursed for any expenses incurred in rendering services under this Contract. 08/12/2025
C7
5 of 237
Professional Services (Non-Construction) (RFP)(NPW) 3 of 9 RICK ENGINEERING COMPANY [51960-2] 00051960 4

6.0 CONTRACT DOCUMENTS
The Contract comprises the following documents including all additions, deletions, modifications, and appendices and all addenda setting forth any modifications or interpretations of any these documents: Documents required under Exhibits A–E.

7.0 TIME FOR COMPLETION AND COMMENCEMENT OF SERVICES
All Services under the Contract must be completed in compliance with the schedule in Exhibit A.

8.0 STANDARD OF PERFORMANCE

8.1 Contractor represents and warrants that it has the training, qualifications, experience, and facilities necessary to properly perform the Services required under this Contract in a thorough, competent, and professional manner. At all times Contractor shall faithfully, competently and to the best of its ability, experience, and talent, perform all services described herein. In meeting its obligations under this Contract, Contractor shall employ, at a minimum, generally accepted standards and practices utilized by persons engaged in providing services similar to those required of Contractor under this Contract.

8.2 Contractor shall keep itself informed of and comply with all applicable federal, state, and local laws, statutes, codes, ordinances, regulations, and rules in effect during the Term of this Contract. Contractor shall obtain any and all licenses, permits and authorizations necessary to perform the services set forth in this Contract, including any business licenses required by City. Neither City, nor any elected or appointed boards, officers, officials, employees, or agents of City, shall be liable, at law or in equity, as a result of any failure of Contractor to comply with this Section.

9.0 CONTRACTOR’S STATUS; CONTRACTOR’S EMPLOYEES

9.1 Contractor shall perform the services provided for herein in Contractor's own way as an independent contractor and in pursuit of Contractor's independent calling. Contractor is not to be considered an employee of City, nor shall any employees of Contractor be considered employees of City, for any purpose. Contractor shall be under the direction and control of City staff only as to the results to be accomplished. This Contract is not intended to create the relationship of partnership, joint venture, or association between City and Contractor.

9.2 Contractor represents and warrants that all professional services required under this Contract shall be provided by a person or persons duly licensed by the State of California to provide those types of services.

9.3 Neither Contractor, nor any of Contractor's officers, employees, or agents, shall obtain any rights to retirement, health care or any other benefits which may otherwise accrue to City’s employees. Contractor expressly waives any claim Contractor may have to any such rights.

9.4 Contractor is aware of the requirements of the Immigration Reform and Control Act of 1986 and shall comply with those requirements, including, but not limited to, verifying the eligibility for employment of all of Contractor’s officers, employees, agents, and subcontractors that are included in this Contract.

08/12/2025
C7
6 of 237
Professional Services (Non-Construction) (RFP)(NPW) 4 of 9 RICK ENGINEERING COMPANY [51960-2] 00051960 4

9.5 The payment made to Contractor pursuant to this Contract shall be the full and complete compensation to which Contractor and Contractor’s officers, employees, agents, and subcontractors are entitled for performance of any work under this contract. Neither Contractor nor Contractor’s officers or employees are entitled to any salary or wages, or retirement, health, leave or other fringe benefits applicable to employees of the City. City will not make any federal or state tax withholdings on behalf of Contractor. City shall not be required to pay any workers' compensation insurance on behalf of Contractor.

9.6 Contractor agrees to defend and indemnify City for any obligation, claim, suit, or demand for tax, retirement contribution including any contribution to the Public Employees Retirement System (PERS), social security, salary or wages, overtime payment, or workers' compensation payment which City may be required to make on behalf of Contractor or any employee of Contractor, or any employee of Contractor construed to be an employee of City, for work done under this contract. This is a continuing obligation that survives the termination of this Contract.

10.0 CIVIL RIGHTS

10.1 Contractor agrees to comply with Title VII of the Civil Rights Act of 1964, as amended, the California Fair Employment Practices Act, the Americans with Disabilities Act of 1990, any other applicable federal and state laws and regulations hereinafter enacted.

10.2 Contractor shall not knowingly deny an opportunity or benefit, discriminate against or harass, any employee or applicant for employment on account of the person’s race, color, ethnicity, national origin, ancestry, religion, creed, veteran status, physical disability, mental disability, medical condition, marital status, sex, sexual orientation, age, or other status protected from workplace discrimination by state or federal law.

10.3 Contractor shall not knowingly give preferential treatment to any applicant for employment on the basis of race, color, ethnicity, national origin, ancestry, religion, creed, physical disability, mental disability, medical condition, marital status, sex, or sexual orientation.

10.4 This section shall be interpreted in a manner that is consistent with the California and United States Constitutions and applicable state and federal statutes governing workplace discrimination. The terms used in this section shall have the same meaning as defined in state statutes governing the same subject matter.

10.5 Nothing in this section shall be interpreted as prohibiting bona fide occupational qualifications consistent with applicable state and federal law and reasonably necessary to the normal operation of Contractor. Nothing in this section shall be interpreted as prohibiting regulations and policies to prevent nepotism or conflicts of interest.

10.6 Nothing in this Section shall be interpreted as prohibiting action taken to establish or maintain eligibility for any federal program, where ineligibility would result in a loss of federal funds to City.

10.7 To the fullest extent permitted by law and without limitation by the other provisions of this Contract relating to indemnification and insurance, Contractor shall also indemnify, defend, and hold harmless City, and its directors, officers, employees, and agents from and against all liability (including without limitation all claims, damages, penalties, fines, and judgments, associated investigation and administrative expenses, and defense costs, 08/12/2025
C7
7 of 237
Professional Services (Non-Construction) (RFP)(NPW) 5 of 9 RICK ENGINEERING COMPANY [51960-2] 00051960 4
including but not limited to reasonable attorneys' fees, court costs, and costs of alternative dispute resolution) resulting from any claim of discrimination or harassment, including but not limited to sexual harassment, arising from the conduct of the Contractor or any of the Contractor’s officers, employees, agents, licensees, or subcontractors. In the event of a discrimination or harassment complaint against any employee, agent, licensee, or subcontractors of Contractor or its subcontractors, Contractor shall take immediate and appropriate action in response to such complaint, including, but not limited to termination or appropriate discipline of any responsible employee, agent, licensee, or subcontractors. The provisions of this Section survive completion of the services or termination of the Contract.

11.0 CONTROL OF SERVICES
Each Party shall appoint a representative who shall have the authority to represent and act for that Party (“Representative”). Any written or verbal directions or requests of City's Representative delivered to the Contractor’s Representative shall have the same force and effect as if delivered to the Contractor. The Contractor's Representative shall have the authority to sign any change order, coordinate the work of all subcontractors and make other decisions pertaining to the Contract.

12.0 ASSIGNMENT AND SUBCONSULTING

12.1 Neither this Contract nor any interest herein may be transferred, assigned, conveyed, hypothecated, or encumbered voluntarily or by operation of law, whether for the benefit of creditors or otherwise, without the prior written approval of the City. Transfers restricted hereunder shall include the transfer to any person or group of persons acting in concert of more than twenty-five (25%) of the present ownership and/or control of Contractor, taking all transfers into account on a cumulative basis. In the event of any such unapproved transfer, including any bankruptcy proceeding, this Contract shall be void. No approved transfer shall release the Contractor or any surety of Contractor of any liability hereunder without the express consent of City.

12.2 Contractor shall be fully responsible to the City for any acts and omissions of Contractor's subcontractor, including persons either directly or indirectly employed by subcontractor, in the event Contractor subcontracts any of the work to be performed under this contract. Contractor's responsibility under this paragraph shall be identical to Contractor's liability for acts and omissions of Contractor and employees of the Contractor. Nothing contained in this Contract shall create any contractual relationship between City and any subcontractor of Contractor, but Contractor shall bind every subcontractor and every subcontractor of a subcontractor by the terms of this contract applicable to Contractor's work, unless such change, omission, or addition is approved in advance in writing by the City Manager or the City Manager’s designee. All subcontractors are subject to the prior written review and approval of the City Manager or the City Manager’s designee.

13.0 LICENSES
If a license of any kind, which term is intended to include evidence of registration, is required of Contractor, its employees, agents, or subcontractors by federal, state, or local law, Contractor warrants that such license has been obtained, is valid and in good standing, and that any required bond has been posted in accordance with all applicable laws and regulations. 08/12/2025
C7
8 of 237
Professional Services (Non-Construction) (RFP)(NPW) 6 of 9 RICK ENGINEERING COMPANY [51960-2] 00051960 4

14.0 FINANCIAL RECORDS

14.1 Contractor shall maintain any and all documents, ledgers, books of account, invoices, vouchers, canceled checks, or records demonstrating or relating to Contractor’s performance of services pursuant to this Contract or evidencing or relating to expenditures and disbursements charged to City pursuant to this Contract. Any and all such documents or records shall be maintained in accordance with generally accepted accounting principles and shall be sufficiently complete and detailed so as to permit an accurate evaluation of the services provided by Contractor pursuant to this Contract. Any and all such documents or records shall be maintained for three years from the date of execution of this Contract and to the extent required by laws relating to audits of public agencies and their expenditures. It is expressly understood and agreed that the provisions of this Section will survive termination of this Contract.

14.2 Any and all records or documents required to be maintained pursuant to this Section shall be made available for inspection, audit and copying, at any time during regular business hours, upon request by City or its designated representative. Copies of such documents or records shall be provided directly to the City for inspection, audit and copying when it is practical to do so; otherwise, unless an alternative is mutually agreed upon, such documents and records shall be made available at Contractor's address indicated for receipt of notices in this Contract or the primary location from which services are rendered, whichever is closer.

15.0 OWNERSHIP OF DOCUMENTS
Upon delivery, the work product, including without limitation, all original reports, writings, recordings, drawings, files, and detailed calculations developed under this contract are the property of City. Contractor agrees that all copyrights which arise from creation of the work pursuant to this contract shall be vested in City and waives and relinquishes all claims to copyright or other intellectual property rights in favor of City. City acknowledges that its use of the work product is limited to the purposes contemplated by the scope of Services and that Contractor makes no representation of the suitability of the work product for use in or application to circumstances not contemplated by the scope of Services.

16.0 CONFIDENTIALITY

16.1 Contractor shall treat all information obtained from City in the performance of this Contract as confidential and proprietary to City. Contractor shall treat all records and work product prepared or maintained by Contractor in the performance of this Contract as confidential.

16.2 Contractor agrees that it will not use any information obtained as a consequence of the performance of work for any purpose other than fulfillment of Contractor’s scope of Services. Contractor will not disclose any information prepared for City, or obtained from City or obtained as a consequence of the performance of work to any person other than City, or its own employees, agents or subcontractors who have a need for the information for the performance of Services under this Contract unless such disclosure is specifically authorized in writing by City.

16.3 Contractor’s obligations under this paragraph shall survive the termination of this Contract.
08/12/2025
C7
9 of 237
Professional Services (Non-Construction) (RFP)(NPW) 7 of 9 RICK ENGINEERING COMPANY [51960-2] 00051960 4

17.0 CONFLICT OF INTEREST REQUIREMENT
Contractor agrees that, to the extent applicable, it shall comply with and be bound by all laws and regulations deriving from the relationship of the Contractor to the City, including the Political Reform Act (Government Codes Section 87100 et seq.) Chapters 2.32 or 2.33 of the Vista Municipal Code, the Community Redevelopment Act (Health & Safety Code 33000 et seq.) and all regulations promulgated thereunder (collectively “Conflict Laws”). As a condition precedent to the formation of this Contract, Contractor warrants and covenants that it is adequately informed regarding the obligations and duties imposed by the Conflict Laws and that to the best of Contractor's knowledge and belief, there exists no conflict of interest (under the laws) that would disqualify the Contractor from participation in any decisions arising out of the performance of this Contract. Prior to commencement of any work in the performance of this Contract, Contractor shall comply with any applicable requirements of Chapter 2.32 of the Vista Municipal Code, including any requirement to file a financial disclosure statement with the City Clerk.

Contractor further agrees that no employee, agent or subcontractor for Contractor shall perform any work for the City pursuant to this Contract which will violate the Conflict Laws.

18.0 PROHIBITION OF FINANCIAL INTEREST BY CITY OFFICIAL Contractor warrants and covenants to City that no City Official has or will have any current or future financial interest in this Contract as of the date approved, nor shall Contractor promise, offer, or enter into any written, oral or implied Contract, to provide any financial interest or remuneration of any kind or manner to any City official with respect to this Contract. For purposes of this Section, the term “City Official” shall mean and include any elected or appointed officer of City, any employee of City, or any spouse or financial dependent of a City official or employee. A violation of this provision shall render this Contract null and void and Contractor shall be subject to restitution of all fees or money paid or earned under this Contract.

19.0 DUTY OF INDEMNIFICATION

19.1 To the fullest extent permitted by law, Contractor shall (1) immediately defend and (2) indemnify City, and its directors, officers, and employees from and against all liabilities regardless of nature or type that arise out of, pertain to, or relate to the negligence, recklessness, or willful misconduct of Contractor, or its employees, agents, or subcontractors.

Liabilities subject to the duties to defend and indemnify include, without limitation, all claims, losses, damages, penalties, fines, and judgments; associated investigation and administrative expenses; defense costs, including but not limited to reasonable attorneys’ fees; court costs; and costs of alternative dispute resolution (“Duty of Indemnification”). Contractor’s obligations to both defend and indemnify apply unless it is finally adjudicated that the liability or liabilities, in whole or in part, do not arise out of, pertain to, or relate to the negligence, recklessness, or willful misconduct of Contractor or its employees, agents, or subcontractors. Defense counsel shall be approved by City.

19.2 The review, acceptance or approval of Contractor’s work or work product by any indemnified party shall not affect, relieve, or reduce Contractor’s indemnification or defense obligations. This Section survives completion of the services or the termination of this contract.

The provisions of this Section are not limited by and do not affect the provisions of this contract relating to insurance.

19.3 Contractor’s costs of defense shall not exceed Contractor’s proportionate percentage of fault as adjudicated by a court of law, as required by California Civil Code section 2782.8.
08/12/2025
C7
10 of 237
Professional Services (Non-Construction) (RFP)(NPW) 8 of 9 RICK ENGINEERING COMPANY [51960-2] 00051960 4

20.0 INSURANCE AND BONDS
Contractor shall comply with the insurance provisions set forth in Exhibit C.

21.0 SERVICE OF NOTICE

21.1 Any notice, which either Party may desire to give to the other Party, must be in writing and may be given by personal delivery to the Party’s Representative or by overnight courier service to the Party’s address set forth in Section 1.0. Notice may also be given by mailing it by registered or certified mail, return receipt requested, to the other Party at the address set forth in Section 1.0. Any notice given by mail will be deemed given 48 hours after such notice is deposited in the United States mail, addressed as provided with postage fully prepaid.

21.2 A Party may change its address by giving notice as provided above, and the changed address shall thereafter be deemed to be the address set forth in Section 1.0.

22.0 SPECIAL PROVISIONS
This Contract is subject to, and Contractor shall comply with, the special provisions referenced in Exhibit E, if any.

23.0 EXHIBITS
All documents referenced as exhibits in this Contract, or referenced in an exhibit to this Contract, are incorporated herein.

24.0 APPLICABLE LAW, VENUE
This Contract shall be construed and enforced under the laws of the State of California. If any action is commenced by any Party to this Contract, such action shall be filed in a court of competent jurisdiction within the County of San Diego, California.

25.0 COUNTERPARTS; ELECTRONIC SIGNATURES; ELECTRONIC DELIVERY This Agreement may be executed in separate counterparts, none of which need contain the signatures of both Parties, and each of which, when so executed, shall be deemed an original and all together shall constitute and be one of the same instrument. The Parties agree that this Agreement, whether executed by electronic signature, digital signature, or constituting a scanned or electronically reproduced copy or image of this Agreement bearing the signatures of the Parties, will be deemed an original and will represent competent evidence of the execution, terms and existence of this Agreement notwithstanding the failure or inability to produce an original executed Agreement or counterpart thereof, and without the requirement that the unavailability of such original executed Agreement or counterpart thereof first be proven.

Further, the exchange of this entire executed Agreement (and/or such exhibit(s) or document(s)) that is in photostatic or portable document format (.pdf) form by electronic mail or by another electronic means shall be considered original(s) and shall constitute effective execution and delivery of the original(s).

26.0 MODIFICATIONS
This Contract contains the entire agreement, between the Parties and supersedes all prior negotiations, discussions, obligations, and rights of the Parties in respect of each other regarding the subject matter of this Contract. There is no other written or oral understanding 08/12/2025
C7
11 of 237
Professional Services (Non-Construction) (RFP)(NPW) 9 of 9 RICK ENGINEERING COMPANY [51960-2] 00051960 4
between the Parties. No modification, amendment or alteration of this Contract shall be valid unless it is in writing and signed by all Parties.

[Continued on page 9.]

27.0 EXECUTION
IN WITNESS WHEREOF; the Parties hereto have executed this Contract as of the Contract Date.

“City”

CITY OF VISTA, a chartered municipal
corporation

By:

JOHN B. FRANKLIN, MAYOR

ATTEST:

KATHY VALDEZ, CITY CLERK

By:

APPROVED AS TO FORM:

WALTER CHUNG, CITY ATTORNEY

By:

APPROVED
Allegra Frost
20250711153116

RISK MANAGEMENT REVIEW:

ANALISA HOLBROOK, RISK MANAGER

By:

“Contractor”

RICK ENGINEERING COMPANY, a
California corporation

By:

Name/Title

By:

Name/Title

08/12/2025
C7
12 of 237

00051960 4 Exhibit A

EXHIBIT A

REQUEST FOR PROPOSALS

08/12/2025
C7
13 of 237

1 REQUEST FOR PROPOSALS (RFP)

FOR PROFESSIONAL SERVICES

FOR

Trash Capture BMP Device Analysis
CIP 8343

Issue Date: April 16, 2025

Submittal Deadline: May 22, 2025 at 4:00PM

08/12/2025
C7
14 of 237

2 REQUEST FOR PROPOSALS

TRASH CAPTURE BMP DEVICE ANALYSIS

I. INTRODUCTION

The City of Vista is soliciting proposals fr om qualified professional engineering firms (Consultant) to analyze the potential candidat e projects for trash capture structural devices.

This RFP includes a description of the proposal requirements, criteria for selection, and the scope of services to be provided by the Consultant.

All interested firms must have sufficient, r eadily available resources in the form of trained personnel, support services, specialized subconsultants, and financial resources to carry out the work without delay or shortcomings.

All Consultants must create an account on the City’s Electronic Bidding System, OpenGov Procurement to subm it a proposal. Consultants can register using the ‘Sign Up’ link at the top of the page at:

https://procurement.opengov.com/portal/cityofvista

Once registered, Consultants mu st download this solicitation in order to appear on the Bidder’s List as a “Prospective Bidder.” Consultants that fail to specifically download this solicitation will not ap pear on the Bidders’ Li st and will be unable to participate or be considered for this RFP. See further inst ructions related to OpenGov Procurement under Section VIII (Proposal), below.

The Consultant and all subconsul tants shall have a City of Vista Business License prior to award of contract. Business licenses can be obtained at www.vistabl.com. A City of Vista Business License is not required to propose on this request for proposals.

II. BACKGROUND AND PROJECT DESCRIPTION

The City of Vista (City) is required to cont rol trash discharging to the ocean and surface waters through the municipa l separate storm sewer Syst em (MS4) to meet the requirements imposed by the State Wate r Resources Control Board (SWRCB) (Resolution No. 2015-0019) and the San Diego Region Water Quality Control Board (SDRWQCB) (Order No. R9-2017-0077). To co mply with these requi rements, the City prepared a Track 2 Implementation Plan (Cit y of Vista, 2018) that documented the baseline trash loads and target reductions from the City’s priority land use (PLU) areas, 08/12/2025
C7
15 of 237

3 identified key strategies to achieve these targets, quantified load reductions achieved by existing strategies, and established an implementation schedule.

Track 2 allows permittees to install, operate, and maintain any combination of full capture systems, multi-benefit projects, other treatment controls, and/ or institutional controls for PLUs. The permittee must demonstrate that such combination achieves full capture system equivalency.

From the implementation pl an, the baseline trash generat ed from the PLUs is 11,130 gallons/year. Trash reduction through non-structural BMPs such as street sweeping and other non-structural BMPs is 4900 gallons/year . The plan anticipates that the remaining portion of the load reduction (6,230 ga llons/year) will be achieved through the installation of structural trash capture devices.

In 2024, the City elected to prepare a California Mandated Trash Cleanup Drainage Master Plan (CMTC DMP) to:

• Compile high resolution geospatial data for the PLU storm drain system within the City’s sphere of influence (SOI). This includes development of a comprehensive Geographic Information System (GIS) inventory of structure and conveyance features within the study area.

• Assess drainage to estimate the flow conveyance capacities of the existing storm drain systems draining to PLU areas. Drainage assessment includes hydrologic and hydraulic (H&H) analysis performed to establish the level of service of the storm drain system.

• Develop a list of multi-benefit capital improvement projects (CIPs) that can be used to meet the remaining trash load reduction requirements while also providing additional benefits such as flood resiliency and water quality improvements.

This report summarizes the efforts completed to collect and update data required for H&H modelling and opportunities identified to address the City’s concern on trash control. In addition, a GIS tool was developed by Rick Engineering to analyze the volume of trash removed by each BMP.

A list of 31 potential structural opportunities was generated per this report. It is important to note that only preliminary screening and desktop review has been performed. Each opportunity shall be further evaluated for f easibility and detailed design. It can be expected that existing conditions within the storm drain system and ROW may make some of these opportunities infeasible or require substantial changes to successfully implement. In some cases, these change s may impact the location and therefore drainage area and corresponding trash captur e benefit of each opportunity and the program as a whole.
08/12/2025
C7
16 of 237

4 III. PROPOSED SCOPE OF SERVICES

The Consultant shall furnish all services as required in order to analyze the existing trash capture BMPs already installed in the City and also t he potential candidate project locations in the CMTC DMP. Consult ant is encouraged to and will be evaluated on modifications and completeness of the scope of work and abi lity to demonstrate innovative, advanced, and well-thought-out me thodologies that the City may not have specifically identified in the scope of work.

The scope of services shall generally include the following:

A. Using the GIS tool and methodology dev eloped by Rick Engineering, determine the volume of trash being removed by the existing trash capture BMP’s currently installed in the City. T here are currently 41 full-c apture trash devices and 397 partial-capture devices. This analysis wi ll determine the remaining trash load that is required to be reduced.
a. Prepare a technical memo summarizing this analysis.
b. Workshop with the City to choose 15 c andidate BMPs for furt her analysis in order to satisfy the remaining trash load reduction requirements.

B. Analyze 15 candidate BMPs out of the 31 identified in the CMTC DMP. a. Prepare 30% plans for these regional and subregional BM Ps in order to determine feasibility. These plans s hould include existing right-of-way and property lines, topography, existing utilities, approximate size and location of the structural device, preliminary co st estimates, as well as any other relevant information affecting the potential installation of these devices. b. Analyze the volume of trash removed by each of these potential devices and provide a recommendation for the 10 bes t candidate devices for satisfying the trash load reduction requirements.

C. Prepare 90% plans for the selected 10 devices.
a. Plans should include detailed site design, hydrology calculations, device specifications, and cost estimates.

D. Prepare 100% plans for the selected 10 devices.
a. Consultant shall provide final design plans, specifications, and cost estimate per City Standards suitable for competitive bidding.

IV. CITY RESPONSIBILITIES

The City will be responsible for the following:

1. Furnish Data: Furnish all reasonably available records and information, including reports, as-built plans, photos, correspondence, etc.

2. Staff Support: Provide staff support and time as required and agreed to in advance of the study.
08/12/2025
C7
17 of 237

5 3. Process and respond to requests to the City.

4. Provide contact informat ion for both internal staff and external stakeholders if applicable.

5. Review submittals from the Consultant in a timely manner.

V. COORDINATION

Coordination with the City, other Consulta nts, property owners, and other involved stakeholders may be required.

The City will decide the manner in which the project coordi nation is undertaken. At the City’s option, coordination efforts may be performed by the C onsultant’s direct contact, by the Consultant acting though the City or by the City only. When coordination efforts require agreement, such agreement shall be coordinated through the City.

VI. PROJECT PROGRESS

The Contract shall begin upon approval by the City, and the Consultant shall commence work after notification to proceed by the City.

The Consultant is advised that any recommendation for contract award is not binding on the City until the Agreement is fully executed and approved by the City.

Progress Review Meetings shall be held at intervals deemed appropriate by the City. At or before each of thes e meetings, the Consultant shall furnish two (2) copies of all completed or partially completed work products which have been developed or altered since the last Progress Review Meeting.

Progress Reports shall be submitted at regular intervals agreed upon mutually, indicating progress achieved during the reporting period in relation to the progress scheduled. The Consultant shall provide the Cit y with the Progress Repo rt at least four (4) working days before the Progress Meeting.

VII. PROPOSAL

A. Schedule. The City’s schedule for the selection process is as follows:

1. City Releases RFP April 16, 2025

2. Deadline for questions May 15, 2025 at 4:00 PM

3. Proposals Due May 22, 2025 at 4:00 PM

4. Notice of Consultant Shortlist May 28, 2025
08/12/2025
C7
18 of 237

6 5. Consultant Interview June 4, 2025

6. Notice of Consultant Selection June 17, 2025

7. Complete Negotiation of Agreement June 26, 2025

8. Council Award September 2025

A Notice to Proceed for this project is t entatively scheduled to be issued in September 2025. Upon issuance of Notice to Proceed, the Consultant sha ll submit a detailed schedule for the project including milestones and progress reports.

All dates are subject to change, and the City reserves the right to extend the date by which proposals are due.

All questions must be submitted via “Q&A” through the City’s Electronic Bidding System, OpenGov Procurement. Phone call or email questions will not be accepted. Answers to all submitted questions will be pr ovided in an addendum through OpenGov Procurement.

To receive addenda and submit a proposal, Consultants shall register on the City’s Electronic Bidding System at https://procurement.opengov.com/portal/cityofvista. Once registered, Consultants must download the RFP while logged in under their own name and identification number to appear on the Electronic Prospe ctive Bidders List as a “Prospective Bidder.” Consultants that fail to download the RFP will not appear on the Electronic Prospective Bidders List and their proposals will be considered non- responsive. If a Consultant is unable to register or download the RFP from OpenGov Procurement, a Consultant representative may contact OpenGov Procurement to troubleshoot the problem.

All proposal documents and supplement ary documents must be uploaded using OpenGov Procurement pr ior to event date and time as in structed in this solicitation.

Once file(s) have been uploaded and the Submi ssion Status shows as “Submitted” the submission is complete. At that point respondents will re ceive an email confirmation from OpenGov Procurement.

OpenGov Procurement will determine the official time for t he advertised proposal due date and such determination will be final. Any proposals not received in a timely manner on the Proposal Due Date, as described above, will not be considered.

B. Proposal Submittal Requirements.

In order to maintain uniformity with all proposals furnished by the Consultants, the City requests that the proposals be limit ed to a maximum of twenty five (25) single-sided 8.5” x 11” pages (excluding cover letter, front and back covers, section dividers and resumes). 11” x 17” single-sided foldouts may be used for 08/12/2025
C7
19 of 237

7 graphics only and will count as one page. Proposals shall include the following elements:

1. COVER LETTER – A cover letter shall summarize key elements and guarantee that key personnel will be committed to perform the required tasks throughout the duration of the contract. The cover le tter shall be limited to two (2) pages and shall include a contact name, email, phone number and full address for the Consultant. The cover letter shall incl ude a statement that the Consultant can meet the City’s insurance requirem ents and is prepared to execute the Professional Services Master Agreem ent as written, and will not make any changes to the project team without authorization of the Cit y. In cases, where a team member voluntary leaves a firm, the Consultant shall provide the City a proposal for a substitute team member subject to the approval of the City.

2. COMPANY INFORMATION
a. Identification of Responder;
b. Legal name and address of the company (partnership, corporation, joint venture, etc.);
c. Identification of the par ent company (if applicable); d. Addresses of offices located in San Diego County;
e. Number of employees in San Diego County;
f. Name, title, address and telephone number of person to contact concerning the proposal.

3. PROJECT UNDERSTANDING AND APPROACH – Discuss the Consultant’s understanding of the project, and any suggestions or special concerns that the City and the Consultant should address fo r a successful project. Provide a narrative rendition of the technical and management approach proposed for this project. Show how all required tasks are to be completed.

4. DETAILED SCOPE OF SERVICES
a. Provide a detailed scope of work c ontaining any additional services or tasks the Consultant sees as necessary for the successful completion of the project. The scope of work sha ll include any information required to further clarify the scope of work incl uded in the RFP. The scope of work shall reflect the schedule and fee estimate included in this section. b. Provide a detailed project schedule, in cluding stages of work, time frames, and ability to perform the required services in a timely manner. c. Provide a detailed breakdown of t he number of hours for each staff classification (including both professional and administrative classifications) as they relate to ea ch task identified in the Scope of Work.

A fee table will not be requi red at this time. Consultants selected for interview will be asked provide a final fee table at the interview.

08/12/2025
C7
20 of 237

8 5. PROJECT TEAM AND ORGANIZATION CHART
a. Describe project organization, includi ng identification and responsibilities of key personnel.
b. Indicate roles of prime and all sub-consultants.
c. Provide a discussion of the experience of the Project Manager and other key staff members that would be involved with this project. d. Provide resumes of the Project M anager, Project Engineer, and other key staff members who will work on this project. The resume shall include relevant experience, education, licens es, and certifications. The resume for each individual shall not exceed one (1) page in length. Resumes shall be included as an appendix to the main document.
e. Describe proposed line-of-communication between the City, prime team members, and sub-consultants.

6. EXPERIENCE
a. Provide a brief description of consultant's experience in completing similar projects within the last 5 years.
b. Provide a detailed di scussion of specialized experience in completing scope of required services listed above.
c. Provide three (3) similar projects which your firm has completed within the last 5 years. Projects currently being performed may be submitted for consideration. Project informati on should include a brief project description, agency or client name, t heir telephone number(s), the year of project completion, and the project construction cost.
d. Identify team members proposed for this project and their roles on the representative similar projects.

7. REFERENCES – The Consultant shall prov ide a minimum of three (3) references for similar projects for th e prime firm. At least one reference shall be from the projects listed in Item 6.c of EXPERIENCE. At a minimum, ea ch reference shall include the client’s name and location, number of projects completed for the client, client contact name and phone number.

8. STANDARD HOURLY BILL RA TES – The Consultant’s Standard Hourly Billing Rates for all classifications of staff likely to be involved in the project shall be included along with the mark-up rate for any non-labor expenses and sub- consultants.

9. EXCEPTIONS TO RFP – Provide a statem ent that the Cons ultant has read, understands, and takes no exc eption to the RFP or the terms of the City’s Standard Consulting Agreement, atta ched as ATTACHMENT “A”. If the Consultant does take exception(s) to any portion of the RFP, th e specific portion to which exception is taken shall be identified and explained.

08/12/2025
C7
21 of 237

9 10. ADDENDA TO THE RFP – Provide a statement that the Consultant has received all addenda, and include the addendum numbers and dates.

11. All copies shall be signed by an indivi dual or, if a corporat ion, a corporation officer with the power to bind the company or corporation to its proposal. To be considered, all proposals shall be completely responsive to this RFP.

VIII. CRITERIA FOR SELECTION

The City's consultant evaluation and selection process is based on Qualifications Based Selection (QBS) for professi onal services. An evaluation committee appointed by the City Engineer will review the proposals. The criteria and weight for evaluating the proposals submitted will be as follows:

1. Project Understanding: Demons trated understanding of the project requirements, degree of creativity and innovation demonstrated with respect to the project approach and scope of work, and reasonableness of the schedule for the work and how the time has been allocated to specific tasks (30 points)

2. Responsiveness to Client’s Needs: Familiarity with City, State, and federal requirements and procedures; and thoroughness and completeness of proposal in response to RFP (20 points)

3. Firm’s Experience with Similar Projects: Technical experience of project team in performing work of a closely related nature, experience working with public agencies, record of completing work on schedule and within budget. (15 points)

4. Staff and Project Experience: Qualificat ions of project team staff members, key personnel’s level of involvement in performing related work, logic of project organization, and adequacy of labor commitment. (15 points)

5. Knowledge of Local Hydrology and Dr ainage: Familiarity of local drainage basins, hydrology, and history of improvements and flooding within watershed area. (10 points)

6. Quality of Work Product: Demonstrated technical ability based on relevance and quality of sample work product (10 points)

Fee Schedule (separate electronic file uploa ded to OpenGov Procurement ). The fee schedule of the top ranked Consultant will be opened at the conclusion of the consultant evaluation and sele ction process. Fees will not be used to determine the ranking of the consultants. The City may interview a short list of top ranked qualified consultants or proceed directly to negotia ting the final fee schedule with the top ranked consultant. The ultimate cons ultant selection wil l be based upon both technical merit and value to the City.

The contract award, if any, will go to the Consultant whose proposal best serves the interests of the City, as it determines in it s sole discretion accord ing to the evaluation 08/12/2025
C7
22 of 237

10 criteria described above.

The individual or composite ratings and evaluation forms prepared by City’s evaluators will not be revealed.

IX. REQUIREMENTS FO R PROVIDING SERVICES

The selected Consultant shall be expected to comply with all applicable federal, state, and local regulations, and contract provisions. The selected consultant will be expected to perform the work as described in this RFP.

Consultant shall carry out the instructions received from the City and shall cooperate with the City and other involved agencies.

The Consultant will be required to assume responsibility for all services offered in their proposals. The selected cons ultant will be the sole point of contact with regard to contractual matters, including payment of any and all charges resulting from contracts.

The Consultant shall have a Quality Control and Quality Assurance (QA/QC) plan in effect during the entire time work is being performed under the Agreement. The QC/QA plan shall establish a process whereby plans and other work products are independently checked, corrected, and back checked, and all job-related correspondence and memoranda are dated and then bound in appropriate job files.

Consultant is responsible for researching available records, determining their usefulness on this project, and paying any charges for copies of records.

All exhibits, studies, reports, plans, specific ations, estimates, calculations, and other documents shall be prepared in accordance with the scope of work. Plans and exhibits shall be computer drafted in AutoCAD, ArcView or other compatible software and delivered to the City of Vista at project completion on electronic media in a format readable by the City, along with .pdf files for archival purposes.

The exhibits, studies, reports, plans, specifications, estimates, calculations, and other documents furnished under the Agreement shall be of a quality acceptable to the City. All work products shall be of neat appearance, well organized, technically and grammatically correct, internally consistent, thoroughly reviewed and checked, dated, designated with an accurate “percent complete” number, and having the maker and checker identified. The minimum standard of appearance, organization and content of the drawings and other work products shall be that of similar types provided by the Consultant in its Proposal as Sample Work Products and as set forth in related City of Vista standards and guidelines.

The Consultant shall modify its work as necessary to meet the level of acceptability defined by the criteria above.

The Consultant has total responsibility for the accuracy and completeness of the studies, reports, exhibits, plans and related designs, specifications and estimates prepared and 08/12/2025
C7
23 of 237

11 shall check all such materials accordingly. The reports, plans, and other work products will be reviewed by the City for conformity with the requirements of the Agreement. Reviews by the City do NOT include detailed review or checking of design or the accuracy with which such designs are depict ed on the plans. The resp onsibility for accuracy and completeness of such items remains solely that of Consultant.

All completed work, including surveys, workshop documents, schematic designs, ancillary reports, calculations, correspondence, and all other work product developed as part of this project, whether in written, video, or electronic formats, becomes the property of the City at the end of the project.

X. ESTABLISHMENT OF FEES

The Consultant shall be paid based upon hourly rates and unit costs for services rendered as negotiated.

Sub-consultant costs shall be allocated on a per task basis but does not need to be broken out by each staff classifications. The City limits mark up for sub- consultants and direct costs to 5%. This information will be used by City staff to evaluate the reasonableness of the estimat ed cost of services and will be used in negotiating the final fee amounts for the contract agreement. Hourly rates shall be based on work occurring in 2025 and 2026. Pr oposed rates shall clearly correlate with names and classifications of staff likely to be involved with the projects.

The Consultant shall be paid based upon hour ly rates for services rendered as negotiated.

There will be no compensation to the C onsultant for hours expended due to the Consultant’s errors and omissions. There will be no adjustments including an increase in the hourly rate.

XI. METHOD OF PAYMENT

The Consultant shall submit monthly invoices to the City. Each invoice shall include a detailed breakdown of t he services, the tasks, the hours, the personnel, and staff type who worked on the project, and hourly rates. No more than 85 percent of the total payment amount will be made prior to the final completion and approval of all work and delivery of final products.

XII. CONSULTING AGREEMENT

A sample Standard Consulting Agreement is enc losed for review, as Attachment “A”.

The RFP and the Consultant ’s Proposals will be attached and become part of the Agreement as exhibits.

08/12/2025
C7
24 of 237

12 Any subsequent changes in the RFP from the dat e of issuance to the date of submittal will result in an addendum by t he issuing office to those parties who have provided the proper notice of interest in responding to the RFP.

The signer of the proposal must declare in writing that the only person, persons, company or parties interested in the proposal as principals are name d therein; that the proposal is made without collusion with any ot her person, persons, company, or parties submitting a proposal; that it is in all res pects fair and in good faith without collusion or fraud; and, that the signer of the proposal has full authority to bind the principal proposer.

Please refer to the sample agreement for the necessary amounts of general liability, automotive, worker’s com pensation and professional liability insurance. The appropriate endorsements are also shown within the sample contract agreement. The insurance certificate shall in clude the City of Vista and the Buena Sanitation District, its officers and employees as insured or additional insured.

XIII. ASSIGNED REPRESENTATIVES

The City will assign a responsible represent ative to administer the contract, and to assist the Consultant in obt aining information. The Consul tant also shall assign a responsible representative (Project Manager), who shall be identified in the proposal.

The Consultant’s representative will remain in responsible charge of the Consultant’s duties from the Notice-to-Pr oceed through project completion. If the Consultant’s Project Manager should be unable to continue with the project, then the Consultant shall notify the City’s representative in writing. The City’s representative shall first approve any substitution of representatives or sub- consultants identified in the proposal in writing. The City reserves the right to review and approve/ disapprove all key staff and sub-consultant substitution or removal, and may consider such changes not approved to be a breach of contract. This breach of contract will not apply if the Project Manager leaves the Consulting firm.

XIV. RIGHT TO REJECT PROPOSALS

The City reserves the right to delay the project or reject any or all proposals submitted and no representation is made hereby that any contract will be awarded pursuant to this RFP or otherwise.

The City reserves the right to extend the due date for the proposal, accept or reject any or all proposals received as a result of this request, negotiate with any qualified consultant or cancel this RFP in part or in its entirety. The City may require the selected 08/12/2025
C7
25 of 237

13 consultant to participate in negotiations and to submit such techni cal, fee, or other revisions of their proposals as may result from negotiations.

All costs incurred in the preparation of the proposal, the submission of additional information and/or any aspect of a proposal prio r to award of a written contract will be borne by the Respondent. The City will provide only the staff assistance and documentation specifically referred to her ein and will not be responsible for any other cost or obligation of any kind, which may be incurred by the Respondent. All proposals submitted to the City of Vista become the property of the City.

XV. DISCLOSURE

The City is a public agency subject to the disclosure requirements of the Public Records Act, California Government Code Section 6250 and following. These requirements include an exemption for “trade secrets”. If any proprietary information is contained in or attached to the written proposal, it must be clearly identified. In order to protect trade secrets from disclosure, pursuant to a public Records Acts request, you must agree in writing to defend and indemnify the City of Vista if litigation results.

XVI. LATE, MODIFIED, OR WITHDRAWN PROPOSAL

Any Proposal received after the exact time specified for submittal will not be considered.

Any modification of a proposal, except a modi fication resulting from the City's request for "best and final" offer, is subject to the same conditions as the initial submission.

Proposals may be withdrawn by written notice received at any time prior to Notice of Intent to Award. Thereafter, all proposals constitute firm offers, subject to negotiation and execution of definitive documents that will remain open and cannot be revoked, withdrawn, or modified for a period of six (6) months thereafter.

Attachment A: City of Vist a Standard Consulting Agreement

Attachment B: California Mandated Tr ash Cleanup Drainage Master Plan

08/12/2025
C7
26 of 237

14 ATTACHMENT “A”

Standard Consulting Agreement

08/12/2025
C7
27 of 237

15 ATTACHMENT “B”

California Mandated Trash Cleanup Drainage Master Plan

08/12/2025
C7
28 of 237
Professional Services (Non-Construction) (RFP)(NPW) 1 of 9 NAMEX [51960-2] 00051960 4

CONTRACT FOR PROFESSIONAL SERVICES

TYPE OF SERVICES
THIS “CONTRACT” is entered into by and between the “Parties” as of ___________________ (“Contract Date”).

1.0 THE “PARTIES”
The “City”:

CITY OF VISTA, a chartered municipal
corporation
200 Civic Center Drive
Vista, CA 92084

Working Contact: workingname
Billing Contact: billingname
The “Contractor”

NAMEX, statusx
Address1
Address2

Contact: contactname

2.0 BASIC TERMS

2.1 The “Services” to be performed by Contractor are set forth in the Request for Proposals attached as Exhibit A.

2.2 The “Required License” for the Services is: type.

2.3 Contractor, an entity holding the Required License, desires to enter into this “Contract” with City for the Services.

2.4 The “Project” for which the Services are required is described in Exhibit A.

2.5 Contractor has submitted to City a Proposal to perform the Services dated proposaldate (“Exhibit B”).

2.6 The “Contract Ceiling Price” is: pricex

2.7 Any references in Exhibit A or Exhibit B to “Consultant” shall mean Contractor for the purposes of this Contract.

3.0 CONTRACT TERM

3.1 This Contract shall take effect as of the Contract Date.

3.2 This Contract shall be in effect for xx calendar months (“Term”) from the Contract Date. The Term may be extended at the City’s option for an additional yy months, in increments of City’s choice, for a maximum Term of zz months from the Contract Date.

3.3 City may terminate this Contract upon 30-days’ written notice to Contractor. In such event, or upon request of City, Contractor shall assemble all City documents in the Contractor's possession, put them in order for proper filing and closing, and deliver the documents to City. In the event of termination, Contractor shall be paid for work performed to the termination date. City shall make the final determination as to the portion of tasks completed and the compensation to be paid.
08/12/2025
C7
29 of 237
Professional Services (Non-Construction) (RFP)(NPW) 2 of 9 NAMEX [51960-2] 00051960 4

4.0 SCOPE
Contractor shall perform all Services including, but not limited to, the furnishing of all tools, equipment, materials, software, and supplies, and for furnishing all transportation, services, including fuel, power and water, essential communications, and the performance of all labor, work, or other operations, as may be required from time to time, in accordance with Exhibit A and Exhibit B. In the event of a conflict between the provisions of Exhibit A and Exhibit B, the provisions of Exhibit A shall control.

5.0 COMPENSATION

5.1 City shall pay Contractor for the Services to be performed as set forth in Exhibit B.

5.2 An invoice for payment shall be submitted in a form satisfactory to City. At a minimum, the invoice shall include: the purchase order number, the work order number, a description of the work performed, and a total amount.

5.3 Changes in, additions to, or deductions from the Services, including increases or decreases in any item or portion of the Services, shall be set forth in a written change order executed by City and by the Contractor which shall specify:

5.3.1 The changes, additions, and deductions to be made.

5.3.2 The increase or decrease in compensation due the Contractor, if any.

5.3.3 Adjustment in the time of completion, if any.

5.4 Contract Ceiling Price

5.4.1 In no event shall City be liable for paying more than the Contract Ceiling Price for Contractor's services rendered under this contract.

5.4.2 If it becomes foreseeable that Contractor will need to perform services such that the cumulative total of costs to City will exceed the maximum permitted by this Contract, any such cost overrun will be handled pursuant to the change order procedure in Vista Municipal Code Chapter 3.08. City and Contractor recognize that City lacks authority to exceed the cost ceiling without the express authorization of the City Council. If the maximum cost to City for this Contract is exceeded unexpectedly, payment shall be made as mutually agreeable and disputes shall be handled pursuant to this Contract, but work shall cease as soon as is reasonably feasible once the cost ceiling plus allowable change orders, if any, is exceeded.

5.5 Except as provided in Exhibit B, Contractor shall not be reimbursed for any expenses incurred in rendering services under this Contract. 08/12/2025
C7
30 of 237
Professional Services (Non-Construction) (RFP)(NPW) 3 of 9 NAMEX [51960-2] 00051960 4

6.0 CONTRACT DOCUMENTS
The Contract comprises the following documents including all additions, deletions, modifications, and appendices and all addenda setting forth any modifications or interpretations of any these documents: Documents required under Exhibits A–E.

7.0 TIME FOR COMPLETION AND COMMENCEMENT OF SERVICES
All Services under the Contract must be completed in compliance with the schedule in Exhibit A.

8.0 STANDARD OF PERFORMANCE

8.1 Contractor represents and warrants that it has the training, qualifications, experience, and facilities necessary to properly perform the Services required under this Contract in a thorough, competent, and professional manner. At all times Contractor shall faithfully, competently and to the best of its ability, experience, and talent, perform all services described herein. In meeting its obligations under this Contract, Contractor shall employ, at a minimum, generally accepted standards and practices utilized by persons engaged in providing services similar to those required of Contractor under this Contract.

8.2 Contractor shall keep itself informed of and comply with all applicable federal, state, and local laws, statutes, codes, ordinances, regulations, and rules in effect during the Term of this Contract. Contractor shall obtain any and all licenses, permits and authorizations necessary to perform the services set forth in this Contract, including any business licenses required by City. Neither City, nor any elected or appointed boards, officers, officials, employees, or agents of City, shall be liable, at law or in equity, as a result of any failure of Contractor to comply with this Section.

9.0 CONTRACTOR’S STATUS; CONTRACTOR’S EMPLOYEES

9.1 Contractor shall perform the services provided for herein in Contractor's own way as an independent contractor and in pursuit of Contractor's independent calling. Contractor is not to be considered an employee of City, nor shall any employees of Contractor be considered employees of City, for any purpose. Contractor shall be under the direction and control of City staff only as to the results to be accomplished. This Contract is not intended to create the relationship of partnership, joint venture, or association between City and Contractor.

9.2 Contractor represents and warrants that all professional services required under this Contract shall be provided by a person or persons duly licensed by the State of California to provide those types of services.

9.3 Neither Contractor, nor any of Contractor's officers, employees, or agents, shall obtain any rights to retirement, health care or any other benefits which may otherwise accrue to City’s employees. Contractor expressly waives any claim Contractor may have to any such rights.

9.4 Contractor is aware of the requirements of the Immigration Reform and Control Act of 1986 and shall comply with those requirements, including, but not limited to, verifying the eligibility for employment of all of Contractor’s officers, employees, agents, and subcontractors that are included in this Contract.

08/12/2025
C7
31 of 237
Professional Services (Non-Construction) (RFP)(NPW) 4 of 9 NAMEX [51960-2] 00051960 4

9.5 The payment made to Contractor pursuant to this Contract shall be the full and complete compensation to which Contractor and Contractor’s officers, employees, agents, and subcontractors are entitled for performance of any work under this contract. Neither Contractor nor Contractor’s officers or employees are entitled to any salary or wages, or retirement, health, leave or other fringe benefits applicable to employees of the City. City will not make any federal or state tax withholdings on behalf of Contractor. City shall not be required to pay any workers' compensation insurance on behalf of Contractor.

9.6 Contractor agrees to defend and indemnify City for any obligation, claim, suit, or demand for tax, retirement contribution including any contribution to the Public Employees Retirement System (PERS), social security, salary or wages, overtime payment, or workers' compensation payment which City may be required to make on behalf of Contractor or any employee of Contractor, or any employee of Contractor construed to be an employee of City, for work done under this contract. This is a continuing obligation that survives the termination of this Contract.

10.0 CIVIL RIGHTS

10.1 Contractor agrees to comply with Title VII of the Civil Rights Act of 1964, as amended, the California Fair Employment Practices Act, the Americans with Disabilities Act of 1990, any other applicable federal and state laws and regulations hereinafter enacted.

10.2 Contractor shall not knowingly deny an opportunity or benefit, discriminate against or harass, any employee or applicant for employment on account of the person’s race, color, ethnicity, national origin, ancestry, religion, creed, veteran status, physical disability, mental disability, medical condition, marital status, sex, sexual orientation, age, or other status protected from workplace discrimination by state or federal law.

10.3 Contractor shall not knowingly give preferential treatment to any applicant for employment on the basis of race, color, ethnicity, national origin, ancestry, religion, creed, physical disability, mental disability, medical condition, marital status, sex, or sexual orientation.

10.4 This section shall be interpreted in a manner that is consistent with the California and United States Constitutions and applicable state and federal statutes governing workplace discrimination. The terms used in this section shall have the same meaning as defined in state statutes governing the same subject matter.

10.5 Nothing in this section shall be interpreted as prohibiting bona fide occupational qualifications consistent with applicable state and federal law and reasonably necessary to the normal operation of Contractor. Nothing in this section shall be interpreted as prohibiting regulations and policies to prevent nepotism or conflicts of interest.

10.6 Nothing in this Section shall be interpreted as prohibiting action taken to establish or maintain eligibility for any federal program, where ineligibility would result in a loss of federal funds to City.

10.7 To the fullest extent permitted by law and without limitation by the other provisions of this Contract relating to indemnification and insurance, Contractor shall also indemnify, defend, and hold harmless City, and its directors, officers, employees, and agents from and against all liability (including without limitation all claims, damages, penalties, fines, and judgments, associated investigation and administrative expenses, and defense costs, 08/12/2025
C7
32 of 237
Professional Services (Non-Construction) (RFP)(NPW) 5 of 9 NAMEX [51960-2] 00051960 4
including but not limited to reasonable attorneys' fees, court costs, and costs of alternative dispute resolution) resulting from any claim of discrimination or harassment, including but not limited to sexual harassment, arising from the conduct of the Contractor or any of the Contractor’s officers, employees, agents, licensees, or subcontractors. In the event of a discrimination or harassment complaint against any employee, agent, licensee, or subcontractors of Contractor or its subcontractors, Contractor shall take immediate and appropriate action in response to such complaint, including, but not limited to termination or appropriate discipline of any responsible employee, agent, licensee, or subcontractors. The provisions of this Section survive completion of the services or termination of the Contract.

11.0 CONTROL OF SERVICES
Each Party shall appoint a representative who shall have the authority to represent and act for that Party (“Representative”). Any written or verbal directions or requests of City's Representative delivered to the Contractor’s Representative shall have the same force and effect as if delivered to the Contractor. The Contractor's Representative shall have the authority to sign any change order, coordinate the work of all subcontractors and make other decisions pertaining to the Contract.

12.0 ASSIGNMENT AND SUBCONSULTING

12.1 Neither this Contract nor any interest herein may be transferred, assigned, conveyed, hypothecated, or encumbered voluntarily or by operation of law, whether for the benefit of creditors or otherwise, without the prior written approval of the City. Transfers restricted hereunder shall include the transfer to any person or group of persons acting in concert of more than twenty-five (25%) of the present ownership and/or control of Contractor, taking all transfers into account on a cumulative basis. In the event of any such unapproved transfer, including any bankruptcy proceeding, this Contract shall be void. No approved transfer shall release the Contractor or any surety of Contractor of any liability hereunder without the express consent of City.

12.2 Contractor shall be fully responsible to the City for any acts and omissions of Contractor's subcontractor, including persons either directly or indirectly employed by subcontractor, in the event Contractor subcontracts any of the work to be performed under this contract. Contractor's responsibility under this paragraph shall be identical to Contractor's liability for acts and omissions of Contractor and employees of the Contractor. Nothing contained in this Contract shall create any contractual relationship between City and any subcontractor of Contractor, but Contractor shall bind every subcontractor and every subcontractor of a subcontractor by the terms of this contract applicable to Contractor's work, unless such change, omission, or addition is approved in advance in writing by the City Manager or the City Manager’s designee. All subcontractors are subject to the prior written review and approval of the City Manager or the City Manager’s designee.

13.0 LICENSES
If a license of any kind, which term is intended to include evidence of registration, is required of Contractor, its employees, agents, or subcontractors by federal, state, or local law, Contractor warrants that such license has been obtained, is valid and in good standing, and that any required bond has been posted in accordance with all applicable laws and regulations. 08/12/2025
C7
33 of 237
Professional Services (Non-Construction) (RFP)(NPW) 6 of 9 NAMEX [51960-2] 00051960 4

14.0 FINANCIAL RECORDS

14.1 Contractor shall maintain any and all documents, ledgers, books of account, invoices, vouchers, canceled checks, or records demonstrating or relating to Contractor’s performance of services pursuant to this Contract or evidencing or relating to expenditures and disbursements charged to City pursuant to this Contract. Any and all such documents or records shall be maintained in accordance with generally accepted accounting principles and shall be sufficiently complete and detailed so as to permit an accurate evaluation of the services provided by Contractor pursuant to this Contract. Any and all such documents or records shall be maintained for three years from the date of execution of this Contract and to the extent required by laws relating to audits of public agencies and their expenditures. It is expressly understood and agreed that the provisions of this Section will survive termination of this Contract.

14.2 Any and all records or documents required to be maintained pursuant to this Section shall be made available for inspection, audit and copying, at any time during regular business hours, upon request by City or its designated representative. Copies of such documents or records shall be provided directly to the City for inspection, audit and copying when it is practical to do so; otherwise, unless an alternative is mutually agreed upon, such documents and records shall be made available at Contractor's address indicated for receipt of notices in this Contract or the primary location from which services are rendered, whichever is closer.

15.0 OWNERSHIP OF DOCUMENTS
Upon delivery, the work product, including without limitation, all original reports, writings, recordings, drawings, files, and detailed calculations developed under this contract are the property of City. Contractor agrees that all copyrights which arise from creation of the work pursuant to this contract shall be vested in City and waives and relinquishes all claims to copyright or other intellectual property rights in favor of City. City acknowledges that its use of the work product is limited to the purposes contemplated by the scope of Services and that Contractor makes no representation of the suitability of the work product for use in or application to circumstances not contemplated by the scope of Services.

16.0 CONFIDENTIALITY

16.1 Contractor shall treat all information obtained from City in the performance of this Contract as confidential and proprietary to City. Contractor shall treat all records and work product prepared or maintained by Contractor in the performance of this Contract as confidential.

16.2 Contractor agrees that it will not use any information obtained as a consequence of the performance of work for any purpose other than fulfillment of Contractor’s scope of Services. Contractor will not disclose any information prepared for City, or obtained from City or obtained as a consequence of the performance of work to any person other than City, or its own employees, agents or subcontractors who have a need for the information for the performance of Services under this Contract unless such disclosure is specifically authorized in writing by City.

16.3 Contractor’s obligations under this paragraph shall survive the termination of this Contract.
08/12/2025
C7
34 of 237
Professional Services (Non-Construction) (RFP)(NPW) 7 of 9 NAMEX [51960-2] 00051960 4

17.0 CONFLICT OF INTEREST REQUIREMENT
Contractor agrees that, to the extent applicable, it shall comply with and be bound by all laws and regulations deriving from the relationship of the Contractor to the City, including the Political Reform Act (Government Codes Section 87100 et seq.) Chapters 2.32 or 2.33 of the Vista Municipal Code, the Community Redevelopment Act (Health & Safety Code 33000 et seq.) and all regulations promulgated thereunder (collectively “Conflict Laws”). As a condition precedent to the formation of this Contract, Contractor warrants and covenants that it is adequately informed regarding the obligations and duties imposed by the Conflict Laws and that to the best of Contractor's knowledge and belief, there exists no conflict of interest (under the laws) that would disqualify the Contractor from participation in any decisions arising out of the performance of this Contract. Prior to commencement of any work in the performance of this Contract, Contractor shall comply with any applicable requirements of Chapter 2.32 of the Vista Municipal Code, including any requirement to file a financial disclosure statement with the City Clerk.

Contractor further agrees that no employee, agent or subcontractor for Contractor shall perform any work for the City pursuant to this Contract which will violate the Conflict Laws.

18.0 PROHIBITION OF FINANCIAL INTEREST BY CITY OFFICIAL Contractor warrants and covenants to City that no City Official has or will have any current or future financial interest in this Contract as of the date approved, nor shall Contractor promise, offer, or enter into any written, oral or implied Contract, to provide any financial interest or remuneration of any kind or manner to any City official with respect to this Contract. For purposes of this Section, the term “City Official” shall mean and include any elected or appointed officer of City, any employee of City, or any spouse or financial dependent of a City official or employee. A violation of this provision shall render this Contract null and void and Contractor shall be subject to restitution of all fees or money paid or earned under this Contract.

19.0 DUTY OF INDEMNIFICATION

19.1 To the fullest extent permitted by law, Contractor shall (1) immediately defend and (2) indemnify City, and its directors, officers, and employees from and against all liabilities regardless of nature or type that arise out of, pertain to, or relate to the negligence, recklessness, or willful misconduct of Contractor, or its employees, agents, or subcontractors.

Liabilities subject to the duties to defend and indemnify include, without limitation, all claims, losses, damages, penalties, fines, and judgments; associated investigation and administrative expenses; defense costs, including but not limited to reasonable attorneys’ fees; court costs; and costs of alternative dispute resolution (“Duty of Indemnification”). Contractor’s obligations to both defend and indemnify apply unless it is finally adjudicated that the liability or liabilities, in whole or in part, do not arise out of, pertain to, or relate to the negligence, recklessness, or willful misconduct of Contractor or its employees, agents, or subcontractors. Defense counsel shall be approved by City.

19.2 The review, acceptance or approval of Contractor’s work or work product by any indemnified party shall not affect, relieve, or reduce Contractor’s indemnification or defense obligations. This Section survives completion of the services or the termination of this contract.

The provisions of this Section are not limited by and do not affect the provisions of this contract relating to insurance.

19.3 Contractor’s costs of defense shall not exceed Contractor’s proportionate percentage of fault as adjudicated by a court of law, as required by California Civil Code section 2782.8.
08/12/2025
C7
35 of 237
Professional Services (Non-Construction) (RFP)(NPW) 8 of 9 NAMEX [51960-2] 00051960 4

20.0 INSURANCE AND BONDS
Contractor shall comply with the insurance provisions set forth in Exhibit C.

21.0 SERVICE OF NOTICE

21.1 Any notice, which either Party may desire to give to the other Party, must be in writing and may be given by personal delivery to the Party’s Representative or by overnight courier service to the Party’s address set forth in Section 1.0. Notice may also be given by mailing it by registered or certified mail, return receipt requested, to the other Party at the address set forth in Section 1.0. Any notice given by mail will be deemed given 48 hours after such notice is deposited in the United States mail, addressed as provided with postage fully prepaid.

21.2 A Party may change its address by giving notice as provided above, and the changed address shall thereafter be deemed to be the address set forth in Section 1.0.

22.0 SPECIAL PROVISIONS
This Contract is subject to, and Contractor shall comply with, the special provisions referenced in Exhibit E, if any.

23.0 EXHIBITS
All documents referenced as exhibits in this Contract, or referenced in an exhibit to this Contract, are incorporated herein.

24.0 APPLICABLE LAW, VENUE
This Contract shall be construed and enforced under the laws of the State of California. If any action is commenced by any Party to this Contract, such action shall be filed in a court of competent jurisdiction within the County of San Diego, California.

25.0 COUNTERPARTS; ELECTRONIC SIGNATURES; ELECTRONIC DELIVERY This Agreement may be executed in separate counterparts, none of which need contain the signatures of both Parties, and each of which, when so executed, shall be deemed an original and all together shall constitute and be one of the same instrument. The Parties agree that this Agreement, whether executed by electronic signature, digital signature, or constituting a scanned or electronically reproduced copy or image of this Agreement bearing the signatures of the Parties, will be deemed an original and will represent competent evidence of the execution, terms and existence of this Agreement notwithstanding the failure or inability to produce an original executed Agreement or counterpart thereof, and without the requirement that the unavailability of such original executed Agreement or counterpart thereof first be proven.

Further, the exchange of this entire executed Agreement (and/or such exhibit(s) or document(s)) that is in photostatic or portable document format (.pdf) form by electronic mail or by another electronic means shall be considered original(s) and shall constitute effective execution and delivery of the original(s).

26.0 MODIFICATIONS
This Contract contains the entire agreement, between the Parties and supersedes all prior negotiations, discussions, obligations, and rights of the Parties in respect of each other regarding the subject matter of this Contract. There is no other written or oral understanding 08/12/2025
C7
36 of 237
Professional Services (Non-Construction) (RFP)(NPW) 9 of 9 NAMEX [51960-2] 00051960 4
between the Parties. No modification, amendment or alteration of this Contract shall be valid unless it is in writing and signed by all Parties.

[Continued on page 9.]

27.0 EXECUTION
IN WITNESS WHEREOF; the Parties hereto have executed this Contract as of the Contract Date.

“City”

CITY OF VISTA, a chartered municipal
corporation

By:

JOHN CONLEY, CITY MANAGER
JOHN B. FRANKLIN, MAYOR

ATTEST:

KATHY VALDEZ, CITY CLERK

By:

APPROVED AS TO FORM:

WALTER CHUNG, CITY ATTORNEY

By:

RISK MANAGEMENT REVIEW:

ANALISA HOLBROOK, RISK MANAGER

By:

“Contractor”

NAMEX, statusx

By:

Name/Title

By:

Name/Title

08/12/2025
C7
37 of 237

00051960 4 Exhibit A

EXHIBIT A

REQUEST FOR PROPOSALS

08/12/2025
C7
38 of 237

00051960 4 Exhibit B

EXHIBIT B
CONTRACTOR’S PROPOSAL

08/12/2025
C7
39 of 237

00051960 4 Exhibit C, Page 1 of 3

EXHIBIT C

INSURANCE REQUIREMENTS
Contractor shall procure and maintain for the duration of the contract, insurance against claims for injuries to persons or damages to property which may arise from or in connection with the performance of the work hereunder by the Contractor, his agents, representatives, employees, or subcontractors. Nothing in these provisions shall limit Contractor’s Duty of Indemnification.

MINIMUM SCOPE AND LIMIT OF INSURANCE
Coverage shall be at least as broad as:

1. Commercial General Liability (“CGL”): Insurance Services Office Form CG 00 01 covering CGL on an “occurrence” basis, including products, completed operations, property damage, bodily injury, and personal & advertising injury with limits no less than $2,000,000 per occurrence. If a general aggregate limit applies, either the general aggregate limit shall apply separately to this Project/location or the general aggregate limit shall be twice the required occurrence limit.

2. Automobile Liability: Insurance Services Office Form Number CA 0001 covering Code 1 (any auto), with limits no less than $2,000,000 per accident for bodily injury and property damage.

3. Workers’ Compensation insurance as required by the State of California, with Statutory Limits, and Employers’ Liability insurance with a limit of no less than $1,000,000 per accident for bodily injury or disease.

Contractor shall also provide the additional coverages checked below and at least as broad as:

4. Professional Liability, with limits no less than $1,000,000 per occurrence or claim, and $2,000,000 policy aggregate.

If the Contractor maintains higher limits than the minimums shown above, City requires and shall be entitled to coverage for the higher limits maintained by the Contractor. Any available insurance proceeds in excess of the specified minimum limits of insurance and coverage shall be available to City.

Deductibles and Self-Insured Retentions
Any deductibles or self-insured retentions must be declared to and approved by City. At the option of City, either: the Contractor shall cause the insurer shall reduce or eliminate such deductibles or self-insured retentions as respects City, its officers, officials, employees, and volunteers; or the Contractor shall provide a financial guarantee satisfactory to City guaranteeing payment of losses and related investigations, claim administration, and defense expenses.

Other Insurance Provisions
The insurance policies are to contain, or be endorsed to contain, the following provisions:

1. The City, its officers, officials, employees, and volunteers are to be covered as additional insureds on the CGL policy with respect to liability arising out of with respect 08/12/2025
C7
40 of 237

00051960 4 Exhibit C, Page 2 of 3
to liability arising out of work or operations performed by or on behalf of the Contractor including materials, parts, or equipment furnished in connection with such work or operations and automobiles owned, leased, hired, or borrowed by or on behalf of the Contractor. General liability coverage can be provided in the form of an endorsement to the Contractor’s insurance (at least as broad as ISO Form CG 20 10, CG 11 85 or both CG 20 10 and CG 20 37 forms if later revisions used), unless otherwise approved in advance by City.

2. For any claims related to this Project, the Contractor’s insurance coverage shall be primary insurance as respects City, its officers, officials, employees, and volunteers.

Any insurance or self-insurance maintained by City, its officers, officials, employees, and volunteers shall be excess of the Contractor’s insurance and shall not contribute with it.

3. Each insurance policy required by this clause shall provide that coverage shall not be canceled, except with notice to City.

Claims Made Policies
If any coverage required is written on a claims-made coverage form:

1. The retroactive date must be shown, and this date must be before the execution date of the contract or the beginning of contract work.

2. Insurance must be maintained and evidence of insurance must be provided for at least five (5) years after completion of contract work.

3. If coverage is canceled or non-renewed, and not replaced with another claims-made policy form with a retroactive date prior to the contract effective, or start of work date, the Contractor must purchase extended reporting period coverage for a minimum of five (5) years after completion of contract work.

4. A copy of the claims reporting requirements must be submitted to City for review.

Acceptability of Insurers
Insurance is to be placed with insurers with a current A.M. Best rating of no less than A: VII, unless otherwise acceptable to City.

Waiver of Subrogation
Contractor hereby agrees to waive rights of subrogation which any insurer of Contractor may acquire from Contractor by virtue of the payment of any loss. Contractor agrees to obtain any endorsement that may be necessary to affect this waiver of subrogation. The Workers’ Compensation policy shall be endorsed with a waiver of subrogation in favor of City for all work performed by the Contractor, its employees, agents and subcontractors.

Verification of Coverage
Contractor shall furnish City with original certificates and amendatory endorsements, or copies of the applicable insurance language, effecting coverage required by this contract. All certificates and endorsements are to be received and approved by City before work commences. However, failure to obtain the required documents prior to the work beginning shall not waive the Contractor’s obligation to provide them. City reserves the right to require 08/12/2025
C7
41 of 237

00051960 4 Exhibit C, Page 3 of 3
complete, certified copies of all required insurance policies, including endorsements, required by these specifications, at any time.

Subcontractors
Contractor shall require and verify that all subcontractors maintain insurance meeting all the requirements stated herein, and Contractor shall ensure that City is an additional insured on insurance required from subcontractors. For CGL coverage, subcontractors shall provide coverage with a format least as broad as CG 20 38 04 13.

Special Risks or Circumstances
City reserves the right to modify these requirements, including limits, based on the nature of the risk, prior experience, insurer, coverage, or other circumstances.

08/12/2025
C7
42 of 237

00051960 4 Exhibit D

AGREEMENT TO COMPLY WITH CALIFORNIA LABOR LAW REQUIREMENTS [Labor Code §§ 1720, 1771.1, 1773.8, 1775, 1776, 1777.5, 1813, 1860, 1861, 3700]

NOT APPLICABLE TO THIS CONTRACT

08/12/2025
C7
43 of 237

00051960 4 Exhibit E

EXHIBIT E

SPECIAL PROVISIONS
This Contract is subject to the following provisions, if checked:

1. State of California grant conditions, as attached.

2. Federal grant conditions, as attached.

3. Other conditions, as attached.

08/12/2025
C7
44 of 237

08/12/2025
C7
45 of 237

City of Vista
California Mandated Trash Cleanup
Drainage Master Plan
March 2024

Prepared For
City of Vista
200 Civic Center Drive
Vista, California 92084

Prepared By
Rick Engineering Company
5620 Friars Road
San Diego, California 92110

Geosyntec Consultants
2355 Northside Dr Suite 250
San Diego, California 92108

08/12/2025
C7
46 of 237

Contents

1.0 INTRODUCTION ........................................................................................................................................ 1

1.1 Limita Ɵons................................................................................................................................................... 1

2.0 HIGH RESOLUTION GEOSPATIAL DATA ....................................................................................................... 2

2.1 Raw Geospa Ɵal Data ................................................................................................................................... 4

2.2 Development of GIS Inventory .............................................................................................. ...................... 4

2.3 Revised Geospa Ɵal Data ............................................................................................................................. 5

3.0 DRAINAGE ASSESSMENT .......................................................................................................................... 8

3.1 Drainage Pa Ʃerns ........................................................................................................................................ 8

3.1.1 Subcatchment Delinea Ɵons ............................................................................................................. 8

3.1.2 Surface Conveyance ...................................................................................................... ................. 11

3.2 Exis Ɵng CondiƟon ..................................................................................................................................... 11

3.2.1 Exis Ɵng CondiƟon Model Methodology ........................................................................................ 11

3.2.2 Exis Ɵng CondiƟon Results ............................................................................................................. 12

4.0 TRASH STRATEGIES ................................................................................................................................. 13

4.1 2018 Track 2 Implementa Ɵon Plan ........................................................................................................... 13

4.2 Scope and Approach of Tras h Order Drainage Planning ........................................................................... 13

4.3 Trash Capture Opportunity Iden ƟficaƟon ................................................................................................. 14

4.3.1 Structural Op Ɵons and Screening Criteria ..................................................................................... 14

4.3.2 Opportunity Iden ƟficaƟon and Screening ..................................................................................... 15

4.4 Performance of Candidate Structural Projects ......................................................................................... 18

4.4.1 Trash Genera Ɵon Rates ................................................................................................................. 18

4.4.2 Methodology for Co mbining Control Types .................................................................................. 19

4.4.3 Results ................................................................................................................. .......................... 20

4.5 Intended Uses ............................................................................................................. .............................. 25

4.5.1 Advancing Sub-Regional and Re gional Structural Controls ........................................................... 25

4.5.2 Priori Ɵzing A reas for Inlet and Site-scale Controls ........................................................................ 26

5.0 REFERENCES ........................................................................................................................................... 27

08/12/2025
C7
47 of 237

Tables
Table 2-1: GeospaƟal Data Inventory ........................................................................................................................ 4 Table 2-2: IniƟal City GIS Storm Drain Data Inventory ............................................................................................... 5 Table 2-3: Revised City GIS Storm Drain Data Inventory and Inventory of Assets Modeled ..................................... 6 Table 2-4: EdiƟng Status of the Storm Drain Inventory ............................................................................................. 7 Table 2-5: Model Status of Conduits and JuncƟons .................................................................................................. 7 Table 3-1: Subwatershed Summary Table ................................................................................................................ 11 Table 4-1: Summary of 2018 Track 2 ImplementaƟon Plan ..................................................................................... 13 Table 4-2: Manufactured Structural Controls Summary .......................................................................................... 15 Table 4-3: Screening Criteria for Regional and Sub-Regional Controls .................................................................... 15 Table 4-4: Priority Land Use GeneraƟon Rates. ....................................................................................................... 19 Table 4-5: Structural Controls Opportunity Summary ............................................................................................. 21 Table 4-6: Total Benefit Update ............................................................................................................................... 25

Figures
Figure 2-1: City of Vista Limits ................................................................................................................................... 3 Figure 3-1: Drainage Areas of ExisƟng CondiƟon ...................................................................................................... 9 Figure 3-2: Major Subwatershed Drainage Areas .................................................................................................... 10

Appendices
A. Data EdiƟng
B. H&H
C. GIS Dataset Exhibits
D. Trash Strategies Exhibits
E. Regional OpportuniƟes

08/12/2025
C7
48 of 237

March 2024
Acronyms/Abbreviations
Acronym/AbbreviaƟon DefiniƟon
1-D 1-Dimensional
ALU alternaƟve land use
BMP best management pracƟce
cfs cubic feet per second
CMTC California Mandated Trash Cleanup
DEM digital elevaƟon model
DMP Drainage Master Plan
Ō foot, feet
GIS geographic informaƟon system
GPLU general plan land use
H&H hydrology and hydraulics
MS4 municipal separate storm sewer
system
NAVD 88 North American VerƟcal Datum of 1988
NGVD 29 NaƟonal GeodeƟc VerƟcal Datum of 1929
NOAA NaƟonal Oceanic and Atmospheric AdministraƟon
PLU priority land use
ROW right-of-way
SDRWQCB San Diego Regional Water Quality Control Board
SSURGO Soil Survey Geographic Database
SWMM Storm Water Management Model
SWRCB State Water Resources Control Board

08/12/2025
C7
49 of 237

1 March 2024

1.0 Introduction
The City of Vista (City) is required to control trash discharging to the ocean and surface waters through the municipal separate storm sewer System (MS4) to meet the requirements imposed by the State Water Resources Control Board (SWRCB) (Resolu Ɵon No. 2015-0019) and the San Diego Region Water Quality Control Board (SDRWQCB) (Order No. R9-2017-0077). To comply with these requirements, the City prepared a Track 2 ImplementaƟon Plan (City of Vista, 2018) that documented the baseline trash loads and target reduc Ɵons from the City’s priority land use (PLU) areas, idenƟfied key strategies to achieve these targets, quanƟfied load reducƟons achieved by exisƟng strategies, and established an implementaƟon schedule. From the implementaƟon plan, the baseline trash generated from the PLUs is 11,130 gallons/year, trash reducƟon already achieved is 6,360 gallons/year (57%), and the remaining trash load to reduce by December 2, 2030, is 4,770 gallons/year (43%).

The City elected to prepare this California Mandated Trash Cleanup Drainage Master Plan (CMTC DMP) to:
• Compile high resolu Ɵon geospa Ɵal data for the PLU storm drain system within the City’s sphere of influence (SOI). This includes development of a comprehensive Geographic Informa Ɵon System (GIS) inventory of structure and conveyance features within the study area. • Assess drainage to esƟmate the flow conveyance capaciƟes of the exisƟng storm drain systems draining to PLU areas. Drainage assessment includes hydrologic and hydraulic (H&H) analysis performed to establish the level of service of the storm drain system.
• Develop a list of mulƟ-benefit capital improvement projects (CIPs) that can be used to meet the remaining trash load reducƟon requirements (4,770 gallons/year; 43%) while also providing addiƟonal benefits such as flood resiliency and water quality improvements.

This report summarizes the e fforts completed to collect and update data required for H&H modelling and opportuniƟes idenƟfied to address the City’s concern on trash control.

1.1 Limitations
This California Mandated Trash Cleanup Drainage Master Plan is a planning level study to iden Ɵfy mulƟ-benefit structural strategies that the City can implement to meet the SWRCB and SDRWQCB requirements. This report has been prepared for master planning purposes only, as a guide for engineers, planners, developers, and City sta ff.

The methods used and outlined within this CMTC DM P were selected for these purposes. Final design requirements will di ffe r a s a r e s u l t o f s i t e - s p e c ific constraints, condi Ɵons, City standards, and other factors.

Detailed engineering calcula Ɵons and inves ƟgaƟons should be prepared for the implementa Ɵon of any of the projects outlined in this study. In addi Ɵon, coordinaƟon with adjacent municipali Ɵes or state agencies may be required for projects that cross jurisdicƟonal boundaries. 08/12/2025
C7
50 of 237

2 March 2024

2.0 High Resolution Geospatial Data
A high-resoluƟon geospaƟal dataset is of key importance for conducƟ ng H&H analyses, including calcula Ɵon of flow rates required to comply with the trash capture requirements. Geospa Ɵal data necessary for these analyses include: an accurate topographic representaƟon of the study area, ground cover/land use informaƟon, and iniƟal storm drain asset inventory.

Prior to conducƟng analyses, steps were taken to improve the quality of Vista’s geospaƟal dataset. Data ediƟng for this study was emphasized in 15 focus ar eas within Vista city limits (See Figure 2-1). Each focus area had large proporƟons consisƟng of PLU areas. Within these zones, a focused effort was made to compile, review, and digiƟze data into one comprehensive dataset with asset connec Ɵvity. Data sources used to accomplish this included as- built plans and improvement drawings. If necessary, assump Ɵons were made to establish connec Ɵvity of data in the non-focus areas and improve spa Ɵal representaƟon of the storm drain system infrastructure, typically based on review of topography and imagery.

The revised dataset was used for H&H analyses supporƟng trash capture modeling efforts. Appendix A provides addiƟonal details of the data ediƟng process and describes assumpƟons that were made. 08/12/2025
C7
51 of 237
Service Layer Credits: World Topographic
Map: SanGIS, California State Parks, Esri,
HERE, Garmin, SafeGraph, GeoTechnologies,
Inc, METI/NASA, USGS, Bureau of Land
Management, EPA, NPS, USDA
World Hillshade: Esri, NASA, NGA, USGS,
FEMA
Agua Hed ionda C
reek
San Marc os Creek
Buena Vista C r eek
12 141015
1 6
8 2 4
7 11
13 5
3 9
Date of Exhibit: 1/6/2023
Source: Esri Community Basemap / SANDAG 2017 Imagery
C:\RICK\Projects\WMP\19378_VistaDMP\GIS\Pro\VistaDMP_FactSheet\VistaDMP_FactSheet.aprx City of Vista Limits

CMTC TRASH ORDER DRAINAGE MASTER PLAN
T
0 0.5 1
Miles
Legend
Vista Sphere of Influence
Focus Areas
Municiple Boundaries
City Boundary
Major Streams
08/12/2025
C7
52 of 237

4 March 2024

2.1 Raw Geospatial Data
Several different sources of data composed the iniƟal geospaƟal dataset. The uƟlized data sets are summarized in Table 2-1 with their associated version dates.

Table 2-1: GeospaƟal Data Inventory
Data Layer Version Date Source (Agency)
DEM 2014 SANDAG
Aerial Imagery 2017 SANDAG
Topography 2018 SANGIS
Storm Drain Network Files (Drain
Conveyance, Drain Structures)1
Downloaded 04/2021 City of Vista
2030 General Plan Land Use2 Downloaded 04/2021 City of Vista Hydrologic Soil Groups (SSURGO) 2015 SSURGO dataset, Web Soil Survey, USGS
Parcel Layer 2019 SANGIS
Floodplain Layers 2016 Federal Emergency Management
Agency
Municipal Boundaries 2018 SANGIS
Imagery 2017 San Diego
1GIS database received from the City labeled “stormwater.gbd” 2GIS database received from the City labeled “citygisdata.gbd”

2.2 Development of GIS Inventory
The storm drain data necessary for the preparaƟon of this CMTC DMP consists of the horizontal layout of the storm drain system, size and material of conduits, and flowline elevaƟons. This informaƟon will require periodic updates to keep an up-to-date representaƟon of the Citywide GIS storm drain conveyance system.

Desktop analyses involved upda Ɵng the storm drain assets and conveyance informa Ɵon in the City’s ini Ɵal GIS dataset. This was completed through review of as-built and improvement plan drawings, aerial imagery, Google Earth observaƟons, and field observaƟons for select locaƟons. The horizontal locaƟon of drainage structures in the inventory was corrected to match aerial imagery. For structures in which depth measurements were not accessible on site and survey or as-built drawing data was not available, engineering judgment was used to assign an invert elevaƟon based on upstream and downstream drainage connec Ɵons. AƩribute data was revised to document these as assumed inverts. A Digital Eleva Ɵon Model (DEM) was u Ɵlized to update rim eleva Ɵons for drainage structures not previously iden Ɵfied in the ini Ɵal data. Google Earth and Street View were used to update the locaƟon and type of each inlet and drainage structure. A datum shi Ō of 2.3 feet was applied to the data that was at the NaƟonal GeodeƟc VerƟcal Datum of 1929 (NGVD 29) to convert to North American VerƟcal Datum of 1988 (NAVD 88).
08/12/2025
C7
53 of 237

5 March 2024
Table 2-2: IniƟal City GIS Storm Drain Data Inventory
Inventory Number Length (mi)
Conduits 5,687 233.3
JuncƟons 4,960 N/A

2.3 Revised Geospatial Data
Table 2-3 provides a summary of the changes to the iniƟal storm drain inventory received from the City. The iniƟal inventory was updated for storm drains and the addi Ɵon of missing drainage structures such as inlets, pipe segments, cleanouts, and outlets. When necessary, the following updates were made through referencing as-built data as well as through Google Earth and Google Street observaƟons conducted via desktop analysis:

• Split iniƟal storm drain pipe segments to include drainage structures and laterals, • Added storm drain pipes and culverts not included in the iniƟal inventory, and • Added detenƟon basins, including water quality basins, if iden Ɵfied on as-builts or was clearly iden Ɵfiable in aerial imagery.

08/12/2025
C7
54 of 237

6 March 2024
Table 2-3: Revised City GIS Storm Drain Data Inventory and Inventory of Assets Modeled All Inventory Modeled Inventory
Type Number Length
(mi) Type Number Length
(mi)
Conduits
Channel 804 99.4
Conduits
Channel 414 47.6
Culvert 23 0.3 Culvert 22 0.3
Ditch 319 17.3 Ditch 54 3.5
Flowline 342 24.6 Flowline 203 14.2
Storm Drain 4,743 97.4 Storm Drain 3,194 71.1
Other 6 0.2 Other - 0
Unknown 34 3.4 Unknown - 0
Sum 6,271 242.6 Sum 3,887 136.7
JuncƟons
Basin 11
JuncƟons
Basin 8
Channel
confluence 551 Channel
confluence 281
Combo Inlet 17 Combo Inlet 14
Connector 2,050 Connector 1,362
Curb Inlet 1,257 Curb Inlet 1,015
Grate Inlet 427 Grate Inlet 284
Headwall 754 Headwall 239
Inlet 946 Inlet 309
Manhole 55 Manhole 49
Other 56 Other 18
Outlet 822 Outlet 303
Unknown 117 Unknown -
Sum 7,063 Sum 3,882

08/12/2025
C7
55 of 237

7 March 2024
As shown, many assets and conveyance segments were added to the inventory via this process. Error! Not a valid bookmark self-reference. displays how the data was edited and which were added, removed, and changed.

Table 2-5 further summarizes the number of assets that are included in the models, and which are not. Storm drains 18 inches and larger and associated structures were modeled in the 15 focus areas and storm drains 36 inches and larger and associated structures were mode led in the remaining areas. Note, the areas draining to systems that are not modeled discharge to the downstream system that is modeled. Model extents start upstream of the backbone system and end at the major ouƞall. The model does not include major FEMA-mapped channels.

Table 2-4: EdiƟng Status of the Storm Drain Inventory
Status Count
Conduits
Added 282
Changed Field 5,411
Moved 264
Remove 38
Other 276
Sum 6,271
Junctions
Added 1,938
Changed Field 4,845
Moved 47
Other 190
Remove 43
Sum 7,063

Table 2-5: Model Status of Conduits and JuncƟons
Model Status Count
Conduits
Yes 3,887
No 2,384
Sum 6,271
Junctions
Yes 3,882
No 3,181
Sum 7,063

08/12/2025
C7
56 of 237

8 March 2024

3.0 Drainage Assessment
Drainage assessment was accomplished using a 1-Dimensional (1-D) H&H model in PCSWMM so Ōware that combines surface and sub-surface drainage pa Ʃerns within the City’s SOI. An exis Ɵng condi Ɵon model was prepared which presents a high-resolu Ɵon visual rendering of the combined surface and sub-surface drainage paƩerns within the study area. For the purposes of this study, the 2-year, 10-year, and 100-year storm events were used to evaluate the storm drain infrastructure and provide informa Ɵon on potenƟal mulƟ-benefit trash capture projects.

This secƟon presents the following:
• Overview of the exisƟng drainage paƩerns (SecƟon 3.1) • Model Setup Methodology (SecƟon 3.2.1)
• Modeling Results (SecƟon 3.2.2)

3.1 Drainage Patterns
The study area for the drainage assessment is ap proximately 32.5 square miles (20,791.9 acres) and flows in a westerly direcƟon toward the Pacific Ocean. For this study, the study area was subdivided into subwatersheds and modeled with a 1-D dual drainage system connected to 1-D storm drain.

3.1.1 Subcatchment Delineations
Semi-automated delineaƟon tools were used in GIS and PCSWMM to create iniƟal delineaƟons of subcatchments and flow paths for each storm water collec Ɵon point (inlet, basin, cross-gu Ʃer, etc.). AŌer the iniƟal delineaƟon, the subcatchment areas were modi fied through reviewing exis Ɵng topography and aerial imagery, resul Ɵng in 1,932 subcatchments (not including the subcatchments in Loma Alta), shown in Figure 3-1. Due to the high resoluƟon of the topographic data, the GIS delinea Ɵon tools were able to generally iden Ɵfy flow paths along curbed roadways, through backyards, and across driveways, establishing an e ffecƟve baseline for subcatchment delineaƟons.
08/12/2025
C7
57 of 237
08/12/2025
C7
58 of 237
08/12/2025
C7
59 of 237

11 March 2024
These subcatchments were then combined resulƟng in three (3) overall subwatershed systems with major storm drain ouƞalls contribuƟng to Buena Vista Creek, Agua Hedionda Creek, and the San Luis Rey River. Refer to Table 3-1 for subwatershed name and area informaƟon. The San Luis Rey subwatershed drains northwest to the San Luis Rey River and has four (4) discharge loca Ɵons near the City’s municipal boundaries or sphere of in fluence (SOI).

Buena Vista drains in a southwest direcƟon into Buena Vista Creek and has one (1) discharge locaƟon just past the City’s sphere of influence border. Agua Hedionda is the most southern subwatershed and has seven (7) discharge locaƟons at the edge of the City’s SOI that will con fluence at Agua Hedionda Creek. The 0.2 square miles of subcatchments within the City’s SOI draining to Loma Alta Creek were iniƟally considered but were ulƟmately not included in analysis because there is a small amount of PLU areas in the subwatershed.

Table 3-1: Subwatershed Summary Table
Subwatershed
Area
(square
miles)
Percent of
Total Study
Area
Agua Hedionda 16.5 51%
Buena Vista 13.3 41%
San Luis Rey 2.7 8%
Sum 32.5

The delineaƟons were used in conjuncƟon with land use and NRCS soil data to provide the hydrologic parameters necessary for H&H modeling as explained in Appendix B. The proposed land use is based on available data from SANGIS. The General Plan Land Use Map and the Hydrologic Soils Group Map exhibits in Appendix C show the different land use and soil types for the exisƟng condiƟon.

3.1.2 Surface Conveyance
An important component of analyzing the stormwater conveyance system is consideraƟon of the variety of surface conveyance types (e.g., natural drainage ways, ditches, channels, and roadway conveyance systems) that connect to the underground drainage infrastructure throughout the City.

3.2 Existing Condition

3.2.1 Existing Condition Model Methodology
The corrected GIS storm drain inventory discussed in Sec Ɵon 2.0 was imported into PCSWMM and formed the basis of the 1-D conveyance porƟon of the study area model. Storm drain networks were viewed horizontally with reference to aerial imagery and ver Ɵcally by viewing the storm drain pro files generated within the program to verify the suitability of the data for modeling purposes.

The DEM, located in Appendix C, was used to develop a 1-D dual drainage to represent stormwater flows in streets, alleys, open channels, and open space areas. This DEM was also used to obtain rim eleva Ɵons at points of 08/12/2025
C7
60 of 237

12 March 2024
connecƟon to the storm drain conveyance system. The capaciƟes of the storm drain system were evaluated based on the 2014 San Diego Hydraulic Manual cr iteria Refer to Appendix B for speci fic criteria use to flag de ficient systems.

The H&H model has the capability to quan Ɵfy the shallow surface a ƩenuaƟon (detenƟon) occurring in the right- of-way (ROW) and open spaces and assess its effect on the peak flows entering the storm drain system (peak flow rates entering the system may be a Ʃenuated, which may reduce the size of required improvements). While the aƩenuaƟon occurring in the present Ɵme is important in understanding the current condi Ɵon and its impacts to the drainage infrastructure, this area cannot be guaranteed to remain available during future development. As a result, future studies should assess the impacts of the re moval of this storage volume from the system. Refer to Appendix B for a more detailed descripƟon of PCSWMM hydraulic methodology and modeling.

3.2.2 Existing Condition Results
Results of H&H modeling were obtained for the 1-year, 1-hour storm event for trash capture strategy development, as well as 24-hour storm event at the 2-, 10-, and 100-year return period. Precipita Ɵon data was obtained from NOAA Atlas 14 PrecipitaƟon Frequency Data Server (PFDS), as discussed in Appendix B of this report.

08/12/2025
C7
61 of 237

13 March 2024

4.0 Trash Strategies
In 2018, the City developed a Track 2 ImplementaƟon Plan (City of Vista, 2018). The plan outlined a combinaƟon of structural and non-structural controls anƟcipated to be implemented to comply with the 2015 Statewide Trash Amendments, as used by San Diego Region Water Quality Control Board Order No. R9-2017-0077. CollecƟvely, these regulaƟons are referred to as the Trash Order. The Trash Order requires full capture equivalency from PLUs by December 2nd, 2030. One of the primary objec Ɵves of this CMTC DMP was to assist with strategic implementaƟon of structural control installaƟon, feasibility, and prioriƟzaƟon to achieve full capture compliance.

4.1 2018 Track 2 Implementation Plan
The City’s Track 2 ImplementaƟon Plan (City of Vista, 2018) documented baseline loads and target load reducƟons from the City’s PLU areas, idenƟfied key strategies to achieve these targets, quan Ɵfied load reducƟons achieved by exisƟng strategies, and presented an implementa Ɵon schedule. The plan iden Ɵfies that an addi Ɵonal 4,770 gallons of trash per year, must be removed annually by December 2 nd, 2030, to achieve full capture compliance (an addi Ɵonal 43% reduc Ɵon in baseline trash load). The plan an Ɵcipates that a substan Ɵal porƟon of load reducƟon will be achieved through the installa Ɵon of structural trash capture devices. Key components of this ImplementaƟon Plan are summarized in Table 4-1.

Table 4-1: Summary of 2018 Track 2 ImplementaƟon Plan

PLU
Area PLU Load (Gallons/Year) Percent of Baseline Load
(Acres)
Baseline 3,200 11,130 NA
Total ExisƟng Treated 701 6,360 57%
Treated by Structural – Full Capture 70 280 3%
Treated by Structural – ParƟal Capture NA2 1,180 11%
Addressed by Street Sweeping NA2 3,565 32%
Addressed by Other Nonstructural NA2 1,335 12%
Remaining Trash to be Removed 3,130 4,770 43%
1Includes area tributary to full capture devices only.
2Area not specified in ImplementaƟon Plan.

4.2 Scope and Approach of Trash Order Drainage Planning The approach taken to iden Ɵfy loca Ɵons for poten Ɵal structural trash capture devices involved three primary elements, each of which are discussed in secƟons noted:

1. Define structural trash capture opƟons, including regional, subregional, and inlet-scale controls, including the condiƟons under which each of these op Ɵons would be priori Ɵzed. Sec Ɵon 4.3.1 includes de finiƟons and screening criteria for these categories of controls.
08/12/2025
C7
62 of 237

14 March 2024

2. IdenƟfy poten Ɵal opportuni Ɵes for subregional and regional structural controls and priori Ɵze these opportuniƟes to idenƟfy candidate project locaƟons and project types. SecƟon 4.3.2 documents the technical methodology and results of this process.

3. QuanƟfy trash capture performance of the iden Ɵfied list of candidate projects. Sec Ɵon 4.4 summarizes the performance of candidate projects.

The results of this effort will support the development of trash-focused capital projects list, including regional and subregional controls. The results will idenƟfy focus areas where one of these capital structural project types is not idenƟfied. In these areas, the City may prioriƟze distributed inlet controls and source control efforts.

4.3 Trash Capture Opportunity Identification
The trash capture opportunity idenƟficaƟon process that follows was built upon a geospaƟal analysis of the City’s storm drain system and priority land uses (Sec Ɵon 2 and 3), the PCSWMM model of the exis Ɵng drainage condiƟons (SecƟon 3) and developing a menu of candidate trash capture strategies and screening criteria.

4.3.1 Structural Options and Screening Criteria
Three categories of structural trash capture devices were idenƟfied to characterize potenƟal project types, defined below. All full capture systems must be approved by the SWRCB. For more informa Ɵon on full capture systems approved by the SWRCB, a list of cer Ɵfied devices is maintained at the SWRCB Trash Implementa Ɵon Program website.

Regional Controls are large mulƟ-benefit devices within large drainage areas, having the potenƟal to capture and remove trash from storm drain system main line pipes. Regional controls can be below ground (e.g., large ba ffle boxes or hydrodynamic separators (HDS)) or at the surface (e.g., deten Ɵon basins, wetland basins, or reten Ɵon basins). Regional controls can be installed either in-line or off-line (where stormwater is diverted out of the channel or storm drain to the control
Sub-Regional Controls remove trash from smaller storm drain laterals before they Ɵe into larger storm drain mainlines and are typically manufactured devices such as hydrodynamic separators that can be installed within the right of way (ROW). This category of control is intended to be replicable at mul Ɵple locaƟons using “off-the- shelf” vendor products with limited engineering and customiza Ɵon requirements. Such devices typically treat a design flowrate less than 40 cubic feet per second (cfs), with a circular pipe 60-inches or less in diameter. This translates to a drainage area not exceeding 120-acres (assuming typical runo ff coe fficients within the City).

However, the device type can limit the allowable drainage area treated. Table 4-2 provides examples of larger sizes offered for these devices and their flow capaci Ɵes. A trash removal system with mul Ɵple devices could be considered, but such system would be considered a Regional Control due to increased complexity of project design, cost, and treatment area. In comparison to regional controls, these systems tend to be smaller and require less customizaƟon of the design for the given opportunity.

08/12/2025
C7
63 of 237

15 March 2024
Table 4-2: Manufactured Structural Controls Summary
Vendor Product/Name Model Number and Unit
Diameter (Ō) Flowrate (cfs) Largest Inflow Pipe
Diameter (in)
Hydro InternaƟonal,
Downstream Defender 12, 12’ Diameter 38 36
Contech CDS 10-C, 10’ Diameter 88 Not Available, assumed less than 72
BioClean Debris
SeparaƟng Baffle Box 11-34-136, Diameter NA 120 72

Distributed Inlet Controls consist of full capture systems such as connector pipe screens, baskets, and inserts that can be installed within storm drain inlets within the ROW. These controls are compara Ɵvely low cost but require more frequent maintenance and can reduce inlet capacity. These controls were not speci fically evaluated for implementaƟon under this plan; however, areas were Regional and Sub-Regional Controls have not been idenƟfied and where exis Ɵng controls are absent, may be areas to prioriƟze the implementa Ɵon of addi Ɵonal distributed inlet controls using available funding and implementaƟon programs.

Regional and Sub-Regional Controls were the focus of this work and are the controls most dependent upon specific design constraints and opportuni Ɵes in order to be integrated e ffecƟvely into the exis Ɵng storm drain system.

Table 4-3 summarizes some of the key constraints and opportuni Ɵes associated with Regional and Sub-Regional Controls.

Table 4-3: Screening Criteria for Regional and Sub-Regional Controls Structural Control Type Typical Treatment
Range (Trash Event)
ConnecƟng Storm
Drain Diameter
Regional – Retrofit or MulƟ-Benefit Greater than 120 cfs Site dependent Regional – Manufactured Controls Greater than 120 cfs 60-inches and up Sub-Regional Up to 40 cfs 36 to 60-inches

4.3.2 Opportunity Identification and Screening
This mul Ɵ-step process involved a broad GIS-based desktop analysis for poten Ɵal opportuni Ɵes followed by screening and prioriƟzaƟon of candidate project locaƟons. Each key step in this process is described below.

Step 1: Compile GIS Data Sources
To support both opportunity iden ƟficaƟon and screening, various available datasets were compiled. These included GIS layers and model results, as described below.

Land Use (polygon layer). This dataset includes land use categories and proposed land use categories, including classificaƟon as priority land use or alternaƟve land use (based on proposed land use). This is the same layer used 08/12/2025
C7
64 of 237

16 March 2024
in the 2018 Track 2 Implementa Ɵon Plan. The following land uses were classi fied as PLUs, where PLUs included mulƟple higher-resoluƟon land use categories:
• Commercial
o Commercial Office
o Commercial Service
o General Commercial
o Neighborhood Commercial
• Industrial
o Industrial General
o Research Light Industrial
• Mixed Urban
• High-Density ResidenƟal
o High-Density ResidenƟal
o Medium High-Density ResidenƟal
• TransportaƟon

The remaining land uses were classi fied as alternaƟve land uses (ALUs) apart from Open Space and Open Space ResidenƟal. ALUs are mapped as “developed area” in the included exhibits and aƩachments included in this plan.

Right of Way (polygon). This dataset is provided by SanGIS.org and consists of polygons showing dedicated rights- of-way (ROW) within the County of San Diego. The dataset is a subset of the Parcel dataset maintained by SanGIS and is updated quarterly (data downloaded 2.22.2022 was used for this analysis). The ROW layer and the land use layer are conƟnuous and complementary (do not overlap).

Drainage System Network (line and point layers). This dataset was developed as part of the PCSWMM model of exisƟng condiƟons. It includes conduit types, dimensions, and nodal linkage informaƟon.

Drainage Areas (polygon). This dataset was developed by R I C K a s p a r t o f t h e P C S W M M m o d e l o f e x i sƟng condiƟons. It defines the drainage area to each modeled inlet in the PCSWMM model. In some cases, each inlet is delineated and modeled. In other cases, the model is of coarser resolu Ɵon and does not have a watershed delineat
ed to the inlet. The drainage area layer also includes downstream node rouƟng. This can be used to idenƟfy the overall rouƟng of flow within the watershed, at a higher level than link node rouƟng.

ExisƟng Full Trash Capture Devices. This dataset was compiled from various sources and provides an inventory of exisƟng full trash capture systems, primarily inlet-scale devices. This includes the point loca Ɵon of these features and the corresponding drainage area. Data sources for this layer included:
• Trash_Catch_Area (polygon) – Includes site boundary (a ssumed to be drainage area), PLU, and Catch_ID fields, sourced from the ‘PLUs_Inlets_TT.mxd’ provided by the City, • BMP_Points (point) -- Includes point features with best management prac Ɵce (BMP) aƩributes from the geodatabase Ɵtled ‘RWQCB_Data’ provided by the City.

ExisƟng Development Site BMPs (polygon). Other BMPs have been installed over Ɵm e a s p a r t o f p r i o r i t y development projects (PDP). This da ta is maintained in a geodatabase Ɵtled ‘RWQCB_Data’ (same as 08/12/2025
C7
65 of 237

17 March 2024
‘BMP_Points’) and includes a ‘BMP_Site’ layer which was provided by the City. This in cludes BMPs that provide some trash capture performance, such as hydrodynamic separators, but may not be sized to the full trash capture flowrate. PDP sizing criteria are normally lower than trash capture sizing criteria. Addi Ɵonally, typical BMPs required on PDP sites are not required to be full capture cer Ɵfied. The ‘BMP_Site’ polygons were assumed to be the contribuƟng/captured drainage area. This layer was amended to include the Paseo Santa Fe Phase II and Phase III site areas (‘PSF_PhaseII_area’ and ‘PSF_PhaseIII_Area’) provided by the City.

Regional DetenƟon Basins. The loca Ɵons of major deten Ɵon basins that were included in the PCSWMM model were compiled. These are opportuni Ɵes for the addi Ɵon of trash capture devices which could include screens at the basin inlet, overflow, or bypass outlet. Three major basins were idenƟfied: 1) Santa Fe, 2) Brengle Terrace, and 3) Monte Vista.

Step 2: Adapt PCSWMM Models for Trash Planning
The exisƟng condiƟons PCSWMM model was uƟlized as the primary tool for idenƟfying candidate project locaƟons.

The model was adapted to enable esƟmaƟon of provisional trash flowrates.

The Trash Amendments de fine a Full Capture System as “a treatment control, or series of treatment controls, including but not limited to, a mul Ɵ-benefit project or a low-impact development control that traps all par Ɵcles 5mm or greater, and has a design treatment capacity…. not less than the peak flow rate, Q, resulƟng from a one- year, one-hour storm in the subdrainage area…”]
A version of the PCSWMM model was developed to represent the trash design storm. To provide reasonable conservaƟsm in this calculaƟon, a 6-hour pre-weƫng period with 0.1 inches per hour of rainfall followed by one hour with the 1-year, 1-hour storm intensity (0.41 inches) was included. The results of this model represent the provisional trash capture flowrate for each conduit in the model. This analysis was primarily used to help assess potenƟal structural control opƟons; it is not intended for project design.

Step 3: Develop Screening Database
Using the datasets described above, a screening database was developed to help idenƟfy potenƟal locaƟons within the network. This database started from the conduits in the drainage system network. Key aƩributes included:
• Conduit
geometry (e.g., circular, rectangular, irregular)
• Conduit dimension (most applicable to circular and rectangular shapes) • ExisƟng trash flowrate from PCSWMM model results
Step 4: Perform Screening
This analysis began by conduc Ɵng a broad query of poten Ɵal structural project loca Ɵons. The following ini Ɵal screening criteria was used to idenƟfy pipe segments that may be most strategically valuable for regional and sub- regional controls:
• Conduit geometry equal to “circular” – this supports the broadest range of o ff-the-shelf vendor technologies.
• Trash flowrate greater than or equal to 20 cfs – below this, it may not be worthwhile to pursue a sub- regional project and inlet-scale projects may be preferred. 08/12/2025
C7
66 of 237

18 March 2024

The screening criteria did not apply to the three potenƟal basin projects. This produced a result of more than 366 pipe segments and three basins. The drainage boundaries layer was then used to trace the upstream area to each of these pipe segments and basins.

Based on inspecƟon of these results, it was found that the list of potenƟal opportuniƟes included many conƟguous conduit segments that represented minor variaƟons of the same opportunity and were not disƟnctly different. It was also determined that some opportuniƟes were nested within other opportuniƟes, so their drainage areas overlapped. ExisƟng overlap areas were determined by incorporaƟng the drainage areas to large regional flood control basins. Finally, potenƟal opportuniƟes intersecƟng the ROW layer were idenƟfied, in some cases tracing up or downstream to adjust potenƟal opportuniƟes so that they coincided with the public ROW.

Based on these observaƟons, the screening results were curated to idenƟfy potenƟal opportuniƟes that addressed disƟnctly di fferent areas and had drainage areas that did not overlap with other poten Ɵal opportuni Ɵes. This narrowed the list down to 31 candidate projects. In a few cases, due to adjustments during the screening process, pipe segments and drainage areas were adjusted and resulted in screened parameters slightly less than the screened criteria (i.e., trash flow less than 20).

Exhibit 1 in Appendix D includes a package of map exhibits showing the 31 candidate projects iden Ɵfied through this screening step.

4.4 Performance of Candidate Structural Projects
The purpose of this secƟon is to quanƟfy the trash load reducƟon performance of the candidate projects idenƟfied above. These calculaƟons were performed in GIS using standard trash genera Ɵon rates. The methodology also accounted for the combined e ffects of di fferent types of controls to avoid poten Ɵal double-coun Ɵng where different controls address the same overlapping area.

4.4.1 Trash Generation Rates
Table 4-4 summarizes the baseline trash genera Ɵon rates (gallons/acre/year) for each PLU. These are the same generaƟon rates used in the 2018 Track 2 Implementa Ɵon Plan. For ALUs, calcula Ɵons were performed using a range from 0.5 gallons/acre/year to 1 gallon/acre/year. While the City has not established a genera Ɵon rate for ALUs, this tabula Ɵon allows for a simple sensi Ɵvity analysis. ALU genera Ɵon rates of 1.0 gallons/acre/year have been used within San Diego County by other Co-permiƩees.

08/12/2025
C7
67 of 237

19 March 2024
Table 4-4: Priority Land Use GeneraƟon Rates.

Priority Land Use (PLU)
Mean Volume Based
Trash GeneraƟon Rates
(gallons/acre/year)
Commercial 6
Industrial 2.6
Mixed Urban 3.7
High-Density ResidenƟal 2.5
Public TransportaƟon StaƟons 3.7
AlternaƟve 0.5 to 1.0

4.4.2 Methodology for Combining Control Types
Several key assumpƟons and decisions were incorporated into the analysis to understand the intersecƟon between potenƟal structural projects, exisƟng structural projects (both full and parƟal capture), and exisƟng non-structural controls. This was an important step to accurately account for the addi Ɵonal load reduc Ɵon provided by the candidate controls beyond the load reduc Ɵon that is currently provided. Mul Ɵple scenarios exist where the potenƟal for overlapping capture was idenƟfied and resolved. • Overlapping Full Capture Drainage Areas: The strategies idenƟfied in this study are regional or subregional structural controls. By nature, these controls have larger drainage areas and have the potenƟal to include areas with exis Ɵng full capture systems. In this case credit was taken for the area that was not already fully captured. AddiƟonally, several the opportuniƟes idenƟfied include nested opportuniƟes, example BV- 2 and Santa Fe DetenƟon Basin. In the case of nested opportuni Ɵes, both opportuniƟes were included in the list of results, but the trash reducƟon credit was limited to the area captured by the larger project(not the nested projects).
• Non-Structural Load ReducƟons within Structural Project Drainage Areas: Non-structural controls (Street Sweeping and Other Non-Structural Controls) are already assumed to provide reducƟons of 32% and 12% respecƟvely (44% of baseline) across all PLU areas. To avoid crediƟng load reducƟon that is already claimed for non-structural controls, the total load captured by candidate structural opportuniƟes idenƟfied in this study was reduced by 44%. This is effecƟvely the same as reducing the trash generaƟon rates in Table 4-4 by 44%.
• Overlapping Full and Par Ɵal Capture Systems: In the Implementa Ɵon Plan, the total load reduc Ɵon achie
ved by parƟal capture systems was 1,180 gallons/year. Based on the City’s GIS inventory, there are a total of 730 acres of sites treated by par Ɵal capture BMPs. Of these 730 acres, approximately 170 acres drain to the potenƟal structural controls idenƟfied in this DMP . Loads were not explicitly allocated to each drainage area because sizing and capture e fficiency informa Ɵon is not available. Therefore, a simple 08/12/2025
C7
68 of 237

20 March 2024
proraƟng approach was used to avoid double counƟng this bene fit. The total load reduc Ɵon idenƟfied here is adjusted by a factor of 170/730 Ɵmes the 1,180 gallons/year. This equates to 275 gallons/year removed by exisƟng parƟal capture systems that is not available to be removed by new structural controls.

4.4.3 Results
The resul Ɵng performance of the candidate structural projects is summarized in Error! Reference source not found. on a per-project basis. The table is listed in descending order of the amount (percentage) of PLU treated by candidate project. This does not imply a preferred order of implementaƟon and there are many addiƟonal factors that influence prioriƟzaƟon, as discussed in SecƟon 4.5.

Each opportunity, its contribuƟng drainage area, and key characterisƟcs are idenƟfied in Appendix D. OpportuniƟes and drainage areas are preliminary, based on available desktop informa Ɵon at the Ɵme of this report. Drainage areas and opportunity aƩributes should be verified as part of subsequent project planning and design. AddiƟonal opportuniƟes may exist.

08/12/2025
C7
69 of 237

21 March 2024
Table 4-5: Structural Controls Opportunity Summary
Proposed
Regional or
Subregional
ID
BMP Category BMP
Type
Total
Drainage
Area (ac)
PLU
Area
(Ac)
PLU Area
w/ExisƟng
Full
Capture
(Ac)
PLU Area
w/ExisƟng
ParƟal
Capture
(Ac)
PotenƟal
Full Capture
Load
(Gallons/Yr)1
ALU
Area
(Ac)
PotenƟal
ALU Load at

0.5 Gallons
per Year
(Gallons/Yr)
PotenƟal
ALU Load at

1.0 Gallons
per Year
(Gallons/Yr)
PLU % of
Total
Catchment
AH-9 Subregional HDS 110 100 0 24 303 11 5 11 91%
AH-5 Subregional HDS 95 84 4 10 217 12 6 12 88%
AH-10 Subregional HDS 67 58 28 5 151 9 4 9 87%
AH-6 Regional/Subregional HDS 105 90 0 24 234 15 8 15 86% AH-12 Subregional HDS 69 49 0 0 129 20 10 20 71%
AH-11 Subregional HDS 66 45 0 5 117 21 10 21 68%
AH-2 Subregional HDS 191 124 0 40 437 67 34 67 65%
BV-19 Subregional HDS 53 31 0 12 148 23 11 23 58%
BV-182 Regional/Subregional HDS 59 29 0 8 170 31 15 31 49% 08/12/2025
C7
70 of 237

22 March 2024
Proposed
Regional or
Subregional
ID
BMP Category BMP
Type
Total
Drainage
Area (ac)
PLU
Area
(Ac)
PLU Area
w/ExisƟng
Full
Capture
(Ac)
PLU Area
w/ExisƟng
ParƟal
Capture
(Ac)
PotenƟal
Full Capture
Load
(Gallons/Yr)1
ALU
Area
(Ac)
PotenƟal
ALU Load at

0.5 Gallons
per Year
(Gallons/Yr)
PotenƟal
ALU Load at

1.0 Gallons
per Year
(Gallons/Yr)
PLU % of
Total
Catchment
BV-12 Subregional HDS 78 37 0 3 152 40 20 40 47%
BV-8 Subregional HDS 121 53 0 7 234 68 34 68 44%
BV-5 Regional/Subregional HDS 99 40 0 7 159 58 29 58 40% BV-3 Regional/Subregional HDS 439 167 0 8 510 272 136 272 38% AH-82 Regional/Subregional HDS 110 39 12 0 176 71 35 71 35% BV-202 Regional/Subregional HDS 57 19 0 1 68 38 19 38 33% BV-62 Subregional HDS 151 45 0 5 125 106 53 106 30%
BV-162 Subregional HDS 130 37 0 1 98 94 47 94 28%
BV-112 Subregional HDS 91 25 0 1 97 65 33 65 27%
08/12/2025
C7
71 of 237

23 March 2024
Proposed
Regional or
Subregional
ID
BMP Category BMP
Type
Total
Drainage
Area (ac)
PLU
Area
(Ac)
PLU Area
w/ExisƟng
Full
Capture
(Ac)
PLU Area
w/ExisƟng
ParƟal
Capture
(Ac)
PotenƟal
Full Capture
Load
(Gallons/Yr)1
ALU
Area
(Ac)
PotenƟal
ALU Load at

0.5 Gallons
per Year
(Gallons/Yr)
PotenƟal
ALU Load at

1.0 Gallons
per Year
(Gallons/Yr)
PLU % of
Total
Catchment
BV-2 Regional Baffle
Box 867 217 0 12 673 649 325 649 25%
BV-4 Subregional HDS 174 43 0 0 167 131 66 131 25%
BV-102 Subregional Baffle
Box 107 26 0 0 81 82 41 82 24%
BV-13 Subregional HDS 96 20 0 7 61 76 38 76 21%
BV-7 Subregional HDS 126 25 0 0 93 101 51 101 20%
BV-15 Subregional HDS 86 16 0 6 58 70 35 70 19%
SL-1 Regional/Subregional HDS 203 36 0 0 144 168 84 168 18% BV-14 Subregional Baffle
Box 74 13 0 1 46 60 30 60 18%
AH-3 Regional/Subregional HDS 617 104 12 0 351 513 256 513 17% BV-17 Subregional HDS 66 11 0 0 45 55 27 55 17%
08/12/2025
C7
72 of 237

24 March 2024
Proposed
Regional or
Subregional
ID
BMP Category BMP
Type
Total
Drainage
Area (ac)
PLU
Area
(Ac)
PLU Area
w/ExisƟng
Full
Capture
(Ac)
PLU Area
w/ExisƟng
ParƟal
Capture
(Ac)
PotenƟal
Full Capture
Load
(Gallons/Yr)1
ALU
Area
(Ac)
PotenƟal
ALU Load at

0.5 Gallons
per Year
(Gallons/Yr)
PotenƟal
ALU Load at

1.0 Gallons
per Year
(Gallons/Yr)
PLU % of
Total
Catchment
BV-9 Subregional HDS 474 41 0 0 214 434 217 434 9%
S SANTA FE Basin Retro fit 841 26 0 1 102 814 407 814 3%

BRENGLE
TE Basin Retrofit 1233 9 0 0 22 1225 612 1225 1%
1Full Capture load reported in this table does not include 44% discount to account for exisƟng non-structural controls. The 44% discount is included in the results in Table 4-6. 2Italicized opportuniƟes are part of a larger full capture drainage area (i.e., nested opportuniƟes). 08/12/2025
C7
73 of 237

25 March 2024
The potenƟal load reducƟon of these candidate projects can provide a significant addiƟon to exisƟng progress documented in the Track 2 ImplementaƟon Plan as summarized in Table 4-6.

Table 4-6: Total Benefit Update
2018 ImplementaƟon Plan Summary
PLU Area
(Acres)
PLU Load
(Gallons/Year)
Percent of Baseline
Load Captured
Baseline Area 3200 11,130 NA
Removal by ExisƟng
Structural and Non-Structural
BMPs
70 (structural, full capture only) 6,360 57%
Remaining aŌer ExisƟng
BMPs -- 4,770 43%
New Structural BMP OpportuniƟes (this DMP)
Area
(Acres)
Load
(Gallons/Year)
Percent of Baseline
Load Captured
New Candidate Structural
OpportuniƟes, PLU benefits
only1
1,400 (PLU) 2,4002,3 22%
AddiƟonal From ALU (0.5
gal/yr) 4,910 (ALU) 2,460 22%
AddiƟonal From ALU (1.0
gal/yr) 4,910 (ALU) 4,910 44%
1Does not include ALU area, load reducƟon, exisƟng Full Capture Area, or Load already treated. 2Includes a 44% reducƟon to account for the claimed non-structural reducƟons. 3This total is reduced by 275 gallon/year to account for the claimed reducƟons from overlapping parƟal capture controls.

Table 4-6 indicates that the combined effect of regional and sub-regional candidate BMPs can equal or exceed the remaining target load reduc Ɵon when accoun Ɵng for ALU loading captured by these BMPs. There are also substanƟal PLU areas that would not be treated as part of these regional and sub-regional candidate projects.

These areas would be candidate for inlet-scale or site-scale controls.

4.5 Intended Uses
The results and opportuni Ɵes summarized in this chapter are intended to be used at the planning level to (1) idenƟfy potenƟal priority loca Ɵons for addi Ɵonal structural controls, and (2) priori Ɵze the construcƟon of inlet scale or site-scale devices where regional or sub-regional structural control opportuniƟes are not idenƟfied.

4.5.1 Advancing Sub-Regional and Regional Structural Controls The analysis presented in the previous sec Ɵons demonstrates how these opportuni Ɵes have been idenƟfied and screened to prioriƟze loca Ɵons with the poten Ɵal for signi ficant capture and overall e fficiency in a Ʃaining the target reducƟons. The resulƟng opportuniƟes can provide substanƟal progress towards aƩaining target reducƟons. 08/12/2025
C7
74 of 237

26 March 2024
It is important to note that only preliminary screening and desktop review has been performed. Each opportunity should be further evaluated for feasibility and detailed design. It can be expected that exis Ɵng condiƟons within the storm drain system and ROW may make some of these opportuniƟes infeasible or require substanƟal changes to successfully implement. In some cases, these changes may impact the locaƟon and therefore drainage area and corresponding trash capture benefit of each opportunity and the program as a whole. At a minimum the following steps are expected to be a part of the feasibility and design process:
• Evaluate physical constraints at each opportunity that could impact the feasibility of installa Ɵon, operaƟons, and maintenance of potenƟal capture systems, • Evaluate the exisƟng and potenƟal impacts of potenƟal capture system on storm drain hydraulics and level of service,
• Where opportuniƟes are determined to be feasible, refine system design and sizing based on site-specific condiƟons,
• Update BMP inventory and planning documents with final design parameters (system type, flow rate, drainage area, PLU treated, etc.).

While the opportuniƟes idenƟfied in this plan may provide significant capture potenƟal, there are likely addiƟonal opportuniƟes that can provide similar bene fit that have not been iden Ɵfied (i.e., diversions from backbone channels or box culverts). Where other CIP projects ar e planned and implemented (i.e., storm drain capacity improvements or replacements) it is recommended that the Trash Planning Map included as Exhibit 2 in Appendix D be reviewed to quickly idenƟfy potenƟal overlapping and nearby projects, or to idenƟfy areas of significant PLU where no structural controls have been idenƟfied.

AddiƟonal feasibility analysis was performed for four opportuniƟes and documented in Appendix E.

4.5.2 Prioritizing Areas for Inlet and Site-scale Controls For planning purposes, PLU areas not being ‘treated’ by candidate projects in Appendix D may be considered most suitable for inlet and site-scale trash capture controls. Notable areas include the vicinity of downtown (Vista Village Drive and E. Vista Way, commercial areas near Sycamore Avenue, and por Ɵons of the Vista business park. For areas within the ROW and adjacent to PLUs, inlets and storm drain infrastructure may be improved with state- cerƟfied trash capture inserts or screen devices. For areas on private sites, the City may consider other mechanisms to capture trash from these areas (such as development requirements or incenƟve programs). In field visual trash screening assessments may be conducted to further priori Ɵze areas for targeted installaƟon of inlet or site-scale controls.

08/12/2025
C7
75 of 237

27 March 2024

5.0 References
Chow, V. T. (1959). Open-channel hydraulics. New York: McGraw-Hill.

City of Vista, 2009. Drainage Master Plan Update. Prepared by Dudek.

City of Vista, 2018. Track 2 Implementa Ɵon Plan: For Compliance with San Diego Region Water Quality Control Board Order No. R9-2017-0077. Prepared by HDR.

County of San Diego, 2003. San Diego County Hydrology Manual.

County of San Diego, 2014. San Diego County Hydraulic Design Manual.

NOAA (Na Ɵonal Oceanic and Atmospheric Administra Ɵon). 2011. Precipita Ɵon Frequency Atlas of the United States, Volume 6, Version 2, Precipita Ɵon Frequency Data Server (PFDS). NOAA Atlas 14. Revised 2014.

Accessed June 2020. hƩps://hdsc.nws.noaa.gov/hdsc/pfds/pfds_map_cont.html

08/12/2025
C7
76 of 237

A. Data Editing

08/12/2025
C7
77 of 237

1 This appendix presents the workflow and assumptions made to update the City’s initial GIS storm drain asset inventory. This workflow can be repeated in the future to make additional updates and/or integration of the CMTC DMP data into City’s system(s).

I. Creating a Working Inventory Dataset
• A schema was developed for the CMTC DMP. The GI S team reviewed the fields to assess which CMTC DMP and initial data fields to adopt into the final schema that will be part of the City’s system.
• Each asset of the initial storm drain asset inventory was assigned a Facility ID. These assets are summarized under the ‘All Inventory’ column in Table 2-3. o This Facility ID can be used to track the asset back to it’s the initial dataset. o The separate junctions files from the City’s inventory were compiled into one (1) junction file and the separate conduit files were compiled into one (1) conduit file. o Coordination was done to determine which fields from the CMTC DMP schema were necessary to bring over to the final dataset.
 Field mapping was performed to associate the initial data into the CMTC DMP data editing schema. The CMTC DMP data supersedes the initial data because it consolidates duplicate fields. The CMTC DMP schema does not include fields that were unnecessary for data editing so it is important to note that these field be considered when incorporating the data into the City systems. • Any data that was added during the CMTC DMP pr ocess has a CMTC DMP Facility ID but will not have a City ID. There are also duplicate named conduits because the initial inventory was split to add junctions and connect systems together. A City Facility ID needs to be added to all new conduits and junctions per City protocol.
• Conduit and junction features were assigned general types to group similar facilities together.

Their assignments came from their initial type if available, Google Earth observations, plans, or assumptions based on their upstream and downst ream conduits. The datum used for the CMTC DMP is NAVD88. All initial elevations (in NGVD29) in the junctions and conduits inventory were increased by 2.3’ to convert the elevations to NAVD88.

08/12/2025
C7
78 of 237

2 II. Procedure to Add Additional Data
The following procedures were followed to add additional data to the storm drain asset inventory:

Rules and Assumptions:
• In general, conduits and junctions were snapped together to maintain a fully connected system. • These steps assume that the data is being added from plans, survey, or another verified data source.
• When junctions were visible from the ground, they were placed at the appropriate location according to available imagery and topography.
o If imagery does not have the locations of the data, pdf’s or tiff’s of plans were georeferenced as a horizontal data source.

Steps:

1. Junctions were added first at the proper location according to imagery or topography. All junctions must have:
a. Type:

Junctions Definitions
Type Definition
Basin A point representation of a polygon basin.

Channel confluence Junction between channel or flowline conduits. Typically, at intersections of conduits or when channel/flowline properties change.

Combo Inlet Typically, a Type C inlet per regional standard drawings—has a curb opening and grate.

Connector Connects underground conduits. Typically added when pipes are connecting and there is no surface manhole.

Curb Inlet Typically, a Type B inlet per regional standard drawings—has an opening in the street curb.

Grate Inlet Typically, a Type I or G inlet per regional standard drawings—has a grate opening on the street.

Headwall A surface opening connected to a culvert or at the upstream end of a channel, flowline, or ditch.

Inlet A surface opening connected to a storm drain that is not verified for its type.

Manhole Like a connector but has a manhole lid at the surface.

Other Junctions that do not fit into other categories. Examples include risers and tin whistles.

Outlet A surface discharge point connected to a subsurface conduit. b. Invert Elevation/Rim Elevation:
 The rim elevation was assu med from the 2018 LiDAR surface. Junctions that are exposed—headwall, outlet, basin—have the same invert elevation as rim elevation.
 If the invert elevation was not known from the data source, the invert elevation was set based on the slope of the connecting pipe. If the slope was not available, engineering assumptions were used to calculate the minimum depth of cover that 08/12/2025
C7
79 of 237

3 may be used over the pipe ( i.e. invert elevation = rim elevation – 2’ cover – height of pipe)
c. Additional fields were populated, if appropriate:
 Data source: as-built, plan, site visit, drawing number  Date Source Year: Year of plan approval
 Applicable assumptions made if not all information is known: Type, elevation, placement. Elevation assumptions should make it clear if the elevation came from upstream, downstream, or is based on a rim and cover calculation.  Any additional comments to provide more context of the edit.

2. Conduits were drawn and snapped to the appropriate junctions on their upstream and downstream end.

3. Storm drain pipes (36” or larger) are defined as ‘backbones’ and generally any pipe intersecting the backbone are ‘laterals’. It is possible for two (2) systems to be considered backbone systems to intersect, and they will then become part of a larger backbone system. a. In general, backbone systems are trunklines that convey flows from the headwaters to the outlet. Laterals convey smaller areas that flow into backbone systems.

4. In the case where a conduit is joining another, longer conduit, the longer conduit was split and a junction was added and snapped at the split location for the system to stay connected.

Initial Data Data After Editing

08/12/2025
C7
80 of 237

4 5. All conduits include:
a. Type:

Conduit Definitions
Type Definition
Channel Surface drainage conduit. Engineered or natural. Typically connecting backbone systems together.

Culvert Subsurface drainage conduit exposed to the surface on both ends. Considered subsurface because the pipe itself is underground.

Ditch Surface drainage conduit. Typically engineered. Typically connecting lateral systems together.

Flowline Surface drainage conduit that acts as a connector path that does not fit the definition of a channel or ditch. Examples include connecting outlets to basin nodes and outlets to inlets via street gutters.

Storm Drain Subsurface drainage conduit.

b. Cross-section geometry: Circular, ellipse, rectangular, etc. c. Material: RCP, Concrete, CMP, HDPE, etc.
 The associated manning’s roughness n should be applied for modeling purposes.

Conduit Roughness
Conduit Material Manning's Roughness (n)
ACP (Asbestos Cement Pipe) 0.013
Asphalt 0.015
CMP (Corrugated Metal Pipe) 0.024
Concrete 0.018
CIPP (Cured-in-place-pipe) 0.015
Earthen 0.06
HDPE (High-Density Polyethylene Pipe) 0.013
RCP (Reinforced Concrete Pipe) 0.013
Steel 0.011

d. Upstream and Downstream elevations or slope
e. Cross-section size/Dimensions: The dimension of the conduit includes the height, width, and side slopes.
 Example:
• If the cross section is circular, the conduit was given a height but no width. • If the cross section is rectangular, the conduit was given a height and width.
08/12/2025
C7
81 of 237

5 • If the cross section is trapezoidal, the conduit was given a height, width, side slopes (ration is horizontal:vertical).
f. Applicable additional fields were populated, if appropriate:
 Data source: as-built, plan, site visit drawing
 Date Source Year: Year of plan
 Assumptions, if not all information is known: Type, elevation, material, size, placement. Elevation assumptions were made clear if the elevation was sourced from upstream, downstream, or is based on a rim and cover calculation. g. Any additional comments to provide more context of the edit.

6. All conduits include a junction on both ends.
a. Conversely, all junctions were connected to a conduit. If a junction was not connected to a conduit (orphan), the flows to the junction would not be conveyed to the system. • A snapping step followed this process to make sure that conduits and junctions were connected and there were no orphan facilities.

III. Additional Assumptions Made During the Study’s Data Editing A. The first step in data correction was making any applicable global edits to the dataset —Horizontal and Vertical Corrections
• Junction and conduits were connected by snapping them together with GIS tools. Any conduit that did not have a junction was assigned a junction at its end. • Assumption: Junctions and conduits not connected to anything were assumed to connect to another facility within a 2’ tolerance. Th is assumes that when the facilities were created, they were meant to be connect to each other. Junctions were added globally because a conduit always needs a junction at its upstream and downstream end. The table below defines what junction type was assigned based on the conduit upstream and downstream of the junction. If there is no conduit defined, that means one does not exist on that end of a junction. Assumed inlets were checked to make sure they existed in priority zones.

Conduits Upstream of Junction Conduit downstream of Junction Junction Assigned Channel Outlet
Culvert Outlet
Ditch Outlet
Flowline Outlet
Conduit Outlet
Storm Drain Outlet
Channel Channel Channel confluence
Channel Culver t Headwall
Channel Ditch Channel confluence
Channel Flowline Channel confluence
Channel Conduit Headwall
Channel Storm Drain Headwall
Culvert Channel Outlet
Culvert Culver t Connector
Culvert Ditch Outlet
08/12/2025
C7
82 of 237

6 Culvert Flowline Outlet
Culvert Conduit Connector
Culvert Storm Drain Connector
Ditch Channel Channel confluence
Ditch Culver t Headwall
Ditch Ditch Channel confluence
Ditch Flowline Channel confluence
Ditch Conduit Headwall
Ditch Storm Drain Headwall
Flowline Channel Channel confluence
Flowline Culver t Headwall
Flowline Ditch Channel confluence
Flowline Flowline Channel confluence
Flowline Conduit Headwall
Flowline Storm Drain Headwall
Conduit Channel Outlet
Conduit Culver t Connector
Conduit Ditch Outlet
Conduit Flowline Outlet
Conduit Conduit Connector
Conduit Storm Drain Connector
Channel Headwall
Culvert Headwall
Ditch Headwall
Flowline Headwall
Conduit Inlet
Storm Drain Inlet
Initial Data Data After Editing

08/12/2025
C7
83 of 237

7 • Once the system was snapped together, junction and conduit invert elevations were shared to the adjacent facility to populate missing data (i.e ., a junction missing an elevation was assigned the invert elevation of the conduit directly downstream) o Assumption: This assumes that the junctions and conduits have the same elevations as the conduits and junctions they are connected to, respectively. If the downstream conduit did not have invert elevations the junction was assigned the invert elevation of the upstream conduit.
• Conduits missing cross sections and types were assigned cross sections based on their geometry and types were assigned based on the geometry and cross section. o Assumption: This assumes that and unknown type conduit with a GEOM1 of 18” is an 18” circular storm drain.

08/12/2025
C7
84 of 237

8 B. The next step was performing detailed editing. Different approaches were taken in Priority and Non-Priority Zones.
• Priority Zones
o The main backbone and laterals were checked to identify missing data and plans were requested.
 35 areas were requested, and 98 plans were provided and reviewed.  Assumption: Areas were assigned for as-built requests through tagging conduits as priority as-builts, secondary as-builts, or site visits. The backbone is considered to be a system that is at least 36” in diameter and is the main conveyance of the system. Laterals are small systems or single conduits that connect to the backbone.
o Data was added if it was in a plan or if it needed to be added even after the global add tool.
 Assumption: If the plans were available, junctions and conduits were added based on the plans. If there were no available plans, data was added based on visual inspections in Google and through logical cases if there was a missing conduit, but it was obviously needed to connect the system (like a flowline).

Initial Data Data After Editing

o If a junction type was missing it would be visually inspected in Google StreetView.

Similarly, data was moved to either connect the system or because it was wrong based on visual inspections in Google.
 Assumption: This assumes that the Google StreetView imag e is still accurate to initial conditions.
o Inventory labeled as private was connected into the system if it was part of the backbone system and most of the information existed.
08/12/2025
C7
85 of 237

9  Assumption: This assumes that small private inventory was not part of the backbone and would not be corrected during this effort. o Data was removed based on City comments (some facilities were labeled as abandoned), plans, or visual inspections in Google StreetView to confirm that a junction did not exist.  Assumption: This assumes that the Google StreetView imag e is still accurate to initial conditions. Visual inspections were used when there were multiple junctions and neither were labeled as removed or were different types (connector and inlet). o If after requesting plans, there was still missing information in the pipes (i.e. lateral pipes that are connected are missing elevations), they were kept as part of the system but had elevations added that connected to the plan-checked storm drain  Assumption: In these cases, the junction, usually an inlet, could be seen in Google. • Non-priority Zones
o The goal for these zones was to connect the backbone system without requesting plans. o If a junction type was missing a global edit on the type of conduit.  Assumption: The same junction-conduit relationship table used during the global edits was used to define what junction type was assigned based on the conduit upstream and downstream of the junction with an unknown type. o Data was added, moved, and removed in a sim ilar fashion as the process in the priority zones but on a much smaller scale.
 Assumption: The non-priority zones were not the focus of the data editing task and data was only added if it was necessary to connect vital systems to the main backbone of the overall inventory. Data was also added if it was necessary to connect a system that would not have functioned without the added data. If a system was not connected but the contributing area was over 20 acres, junctions and flow paths or channels or ditches were added based on visual inspection to tie the systems together.
o Generally, for non-priority zones, laterals were connected to the nearest manhole or connector on the backbone.
 Assumption: This task was part of the cleanup from the global edit that connected conduits and junctions. If the data appeared to exist (through visual inspection on Google Maps, existence of elevation data or city comments, etc.), the data was connected.

C. Tag Data to Be Included in Modeling
• If a private storm drain system had missing information and the size was 42 inches or larger it was modeled as it is most likely part of a backbone system. o Conversely, if a private storm drain system has missing information and the size is 36 inches or smaller, it was not modeled.
• If the storm drain was private and less than 36", it will was not modeled. o Additionally, for non-priority zones, if a system was missing vital information (size, connection to adjacent pipes or backbone) and was not necessary to keep delineation sizes under 40 acres, the system was not modeled.
08/12/2025
C7
86 of 237

10 • Pipe sizes were assessed and if they were not large enough to be considered part of the backbone, they were not included.
o Assumption: If a storm drain is 2” it is not going to be part of the backbone system and will not be included in modeling.
• Channels, ditches, and flow paths were marked as not modeled if they were at the upstream end of the watershed and their contributing area was less than 40 acres. o Assumption: These facilities do not need to be included in modeling because of their small drainage area and not being part of the backbone.
• Conduits outside of the sphere of influence are not modeled and points on the edge of the sphere of influence were added to act as the inflow points of these systems. o Assumption: These conduits were classified as channels and ditches in the initial data. The effort to correct these systems and add in the necessary storm drain, junctions, and channels is beyond the scope of the project.

Initial Data Data After Editing

D. Update Datum and Edit Elevations—Vertical Corrections • The data was brought into PCSWMM and:
o All data with invert elevations had 2.3’ added to their invert elevation to convert the data from the NGVD29 to NAVD88 datum.
o All junctions were assigned rim elevations based on the 2018 DEM.  Assumption: NAVD88 is a more recent datum and considered to be more accurate than NGVD29. The data was raised 2.3’ based on the analyzing sample elevations from NGVD29 and NAVD88 DEM’s
08/12/2025
C7
87 of 237

11 • All junctions that were exposed to the group (headwalls, outlets, channel confluences) were given invert elevations equaling the rim elevation.
• The remaining junctions with no elevations were given a minimum of 2’ of cover to the furthest extent practicable.
o Assumption: The 2’ of cover is based on the 2014 San Diego County Hydraulic Design Manual. If there was not 2’ of cover available because of a large pipe size, shallow slopes, or tying into initial elevation inventory, the invert elevation was raised to try to keep a

0.5% conduit slope.

08/12/2025
C7
88 of 237
19378 CMTC Vista DMP
Field Definition
objectid * A standard field created by ArcGIS
DMP Facility ID DMP unique ID
name An unused field created for the name of the facility Conduit Type The type of conduit the facility is (storm drain, culvert, channel, ditch, flowline, etc.) geom1 The depth of the cross section (ft)
geom2 The width of the cross section (ft)
Inlet Elevation (ft) Invert elevation of the upstream inlet (ft) Outlet Elevation (ft) Invert elevation of the downstream inlet (ft) width A single field to check the bottom width of the cross section in the City's original data (ft) last_edited_user Who last edited the data
last_edited_date Date of last edit
roughness The manning's n roughness value
xsection The conduit's cross section
depth The depth of the cross section (ft)
Width Top A single field to check the top width of the cross section in the City's original data (ft) barrels The nubmer of barrels in a conduit
material The material of the conduit that informs the manning's roughness status The status of the data editing process
Plan Name The name of the plan of reference
Plan Number The number of the plan of reference
Plan Sheet # The sheet of the plan of reference
Date The year of the plan of reference
ownership Ownership
Origin_Ownership Origin of ownership info
Origin_Data Origin of data
modeled Status if node should be included in model
DMP Comment A comment left by the editor during the study AConnection Assumption--connection to system
amaterial Assumption--material type
adsinvert Assumption--downstream invert elevation
asize Assumption--conduit size
ausinvert Assumption--upstream invert elevation
culvrtcode The culvert code to compute losses
slope The slope of the conduit (ft/ft)
Dimension (ft) The dimension of the conduit from City data geom3 Left side slope
geom4 Right side slope
Bottom Width Bottom width of the channel
Outlet Node Name of the node on the outlet end of the conduit. (Linked to NEWUNITID) City Facility ID The unique ID the City assigned the facility City X Section The cross section of the facility from City data City ID An additional ID the City assigned the facility City Comments The comments the City noted about the facility City CIP Name The CIP name associated with the facility City Depth The City calculated depth underground of the facility City Diameter The diameter of the facility based from the City City Width The width of the facility based from the City City Width Bottom The bottom width of the facility based from the City City Width Top The top of the facility based from the City City Conduit Type The conduit type of the facility based from the City City Source The source of the data in the City's data
Inlet Node Name of the node on the inlet end of the conduit. (Linked to NEWUNITID) created_user The individual who created the facility during the data editing process created_date The date the individual created the facility during the data editing process globalid * A Universal Unique ID assigned to a facility by ArcGIS because the data was saved in a geodatabase shape * A standard field created by ArcGIS
Zone The priority zone in which the facility exists
Data Request A note made by the editor if they want to request additional data to edit the facility Watershed The watershed in which the facility exists
Scratch Modeled A scratch field used during the modeling process Delineation Comments Additional comments left by the editors during the delineation process Datum The datum used for the facilities as a reference for future data. The data is in NGVD88 Plan year The year of the plan that references the particular facility u2stat Denotes if the upstream junction is surcharing or not in the 2-year, 24-hour storm u10stat Denotes if the upstream junction is surcharing or not in the 10-year, 24-hour storm u100stat Denotes if the upstream junction is surcharing or not in the 100-year, 24-hour storm Conduit Metadata
The metadata associated with the conduits to provide context for the conduit GIS fields:
08/12/2025
C7
89 of 237
19378 CMTC Vista DMP
Field Definition
Max Flow 100yr (cfs) 100-year maximum (peak) absolute computed flow in the conduit during the simulation (flow units).

Max Flow 10yr (cfs) 10-year maximum (peak) absolute computed flow in the conduit during the simulation (flow units).

Max Flow 2yr (cfs) 2-year maximum (peak) absolute computed flow in the conduit during the simulation (flow units).

Max Velocity 100yr (ft/s) 100-year maximum computed velocity in the conduit during the simulation (feet/second or meters/second).

Max Velocity 10yr (ft/s) 10-year maximum computed velocity in the conduit during the simulation (feet/second or meters/second).

Max/Full Flow 100yr 2-year maximum computed velocity in the conduit during the simulation (feet/second or meters/second).

Max/Full Flow 10yr 100-year maximum (peak) fraction of conduit full flow computed during the simulation (fraction).

Max Velocity 2yr (ft/s) 10-year maximum (peak) fraction of conduit full flow computed during the simulation (fraction).

Max/Full Flow 2yr 2-year maximum (peak) fraction of conduit full flow computed during the simulation (fraction).

Max/Full Depth 100yr 100-year maximum fraction of a conduit full depth computed during the simulation (fraction).

Max/Full Depth 10yr 10-year maximum fraction of a conduit full depth computed during the simulation (fraction).

Max/Full Depth 2yr 2-year maximum fraction of a conduit full depth computed during the simulation (fraction).

Contributing Area 100yr (ac) The contributing area to the facility (acres) Contributing Area 10yr (ac) The contributing area to the facility (acres) Contributing Area 2yr (ac) The contributing area to the facility (acres) Max Volume 100yr (ft³) 100-year maximum computed volume of water in the conduit during the simulation (ft3) Max Volume 10yr (ft³) 10-year maximum computed volume of water in the conduit during the simulation (ft3) Max Volume 2yr (ft³) 2-year maximum computed volume of water in the conduit during the simulation (ft3) USSur100 The upstream MAXHGL-Rim elevation (ft) in the 100-year, 24-hour storm USSur10 The upstream MAXHGL-Rim elevation (ft) in the 10-year, 24-hour storm USSur2 The upstream MAXHGL-Rim elevation (ft) in the 2-year, 24-hour storm Compiled Max Flow 100yr (cfs) The sum of the max flow of the major and minor systems in the 100-year, 24-storm Compiled Max Flow 10yr (cfs) The sum of the max flow of the major and minor systems in the 10-year, 24-storm Compiled Max Flow 2yr (cfs) The sum of the max flow of the major and minor systems in the 2-year, 24-storm st_length(shape) Length of conduit
Plan Check Noted if a plan was checked during the study 08/12/2025
C7
90 of 237
19378 CMTC Vista DMP
objectid * A standard field created by ArcGIS
DMP Facility ID DMP unique ID
Junction Type The type of junction the facility is (channel confluence, connector, inlet, headwall, basin, etc.) invertelev Invert elevation
rimelev Rim elevation
depth The depth of the junction underground (ft)
status The status of the data editing process
plan The name of the plan of reference
Plan Number The number of the plan of reference
Plan Sheet The sheet of the plan of reference
DMP Comments A comment left by the editor during the study ownership Ownership
Origin_Ownership Origin of ownership info
Origin_Data Origin of data
modeled Status if node should be included in model
AsBuilt Year The year of the plan of reference
Assume Invert Assumption related to the invert elevation City Junction Type The junction type of the facility based from the City City NAVD88 Rim The rim elevation of the junction in the NAVD88 datum City NGVD29 Rim The rim elevation of the junction in the NGVD29 datum City ID An additional ID the City assigned the facility City Facility ID The unique ID the City assigned the facility City Status A code from the City denoting if a facility's status City Source The source of the data in the City's data
City Comments The comments the City noted about the facility created_user The individual who created the facility during the data editing process created_date The date the individual created the facility during the data editing process last_edited_user Who last edited the data
last_edited_date Date of last edit
globalid * A Universal Unique ID assigned to a facility by ArcGIS because the data was saved in a geodatabase shape * A standard field created by ArcGIS
Zone The priority zone in which the facility exists
Data Request A note made by the editor if they want to request additional data to edit the facility startctype The conduit type upstream of the facility
endctype The conduit type downstream of the facility
Watershed The watershed in which the facility exists
Scratch Modeled A scratch field used during the modeling process Delineation Comments Additional comments left by the editors during the delineation process Datum The datum used for the facilities as a reference
Plan Year The year of the plan that references the particular facility Max HGL 100yr (ft) 100-year maximum computed HGL in the mode during the simulation (ft) Max HGL 10yr (ft) 10-year maximum computed HGL in the mode during the simulation (ft) Max HGL 2yr (ft) 2-year maximum computed HGL in the mode during the simulation (ft) Max Lat Inflow 100yr (cfs) 100-year maximum (peak) computed lateral inflow into the node during the simulation (cfs) Max Lat Inflow 10yr (cfs) 10-year maximum (peak) computed lateral inflow into the node during the simulation (cfs) Max Lat Inflow 2yr (cfs) 2-year maximum (peak) computed lateral inflow into the node during the simulation (cfs) Max Total Inflow 100yr (cfs) 100-year maximum (peak) computed total inflow into the node during the simulation (cfs) Max Total Inflow 10yr (cfs) 10-year maximum (peak) computed total inflow into the node during the simulation (cfs) Max Total Inflow 2yr (cfs) 2-year maximum (peak) computed total inflow into the node during the simulation (cfs) Total Lat Inflow 100yr (MG) 100-year total computed volume of lateral inflow coming into the node during the simulation (MG) Total Lat Inflow 10yr (MG) 10-year total computed volume of lateral inflow coming into the node during the simulation (MG) Total Lat Inflow 2yr (MG) 2-year total computed volume of lateral inflow coming into the node during the simulation (MG) Total Inflow 100yr (MG) 100-year total computed volume of inflow into the node during the simulation (MG) Total Inflow 10yr (MG) 10-year total computed volume of inflow into the node during the simulation (MG) Total Inflow 2yr (MG) 2-year total computed volume of inflow into the node during the simulation (MG) SUR100 The upstream MAXHGL-Rim elevation (ft) in the 100-year, 24-hour storm SUR10 The upstream MAXHGL-Rim elevation (ft) in the 10-year, 24-hour storm SUR2 The upstream MAXHGL-Rim elevation (ft) in the 2-year, 24-hour storm STAT100 Denotes if the junction is surcharing or not in the 2-year, 24-hour storm STAT10 Denotes if the junction is surcharing or not in the 10-year, 24-hour storm STAT2 Denotes if the junction is surcharing or not in the 100-year, 24-hour storm Plan Check Noted if a plan was checked during the study Junction Metadata
The metadata associated with the junctions to provide context for the conduit GIS fields:
08/12/2025
C7
91 of 237

B. H&H

08/12/2025
C7
92 of 237

1 1.0 Introduction
This appendix summarizes the hydrology and hydraulics modelling methodology used in this CMTC DMP.

The results from the analysis are populated as an attribute to the GIS dataset provided to the City at the conclusion of this project.

2.0 Hydrology - Methodology

2.1 Rainfall
Point precipitation data for the study area was ob tained from the National Oceanic and Atmospheric Administration (NOAA) Atlas 14 Precipitation Frequency Data Server (PFDS) (NOAA 2011). The NOAA data was used because it has more recent data, has a longe r record, and is planned for adoption in the next update of the San Diego County hydrology manual. The end result is a site specific intensity rather than a County-wide equation.

Table 2-1: City of Vista local 24-Hour NOAA precipitation depth (inches) Basin Lat. Long.
1-yr,
1-hr
Precip.
(in.)
2-yr,
24-hr
Precip.
(in.)
10-yr,
24-hr
Precip.
(in.)
100-yr,
24-hr
Precip.
(in.)
Agua Hedionda 33.1696 -117.2178 .435 2.15 3.27 5.11
Buena Vista 33.2044 -117.2362 .431 2.11 3.2 5.01
San Luis Rey 33.2313 -117.2340 .411 1.97 3.01 4.77
Source: NOAA 2011.

Notes: in. = inches; Lat. = latitude; Long. = longitude.

2.1.1 Rainfall Pattern
Setting up a storm simulation in EPA’s Storm Water Management Model (SWMM) requires a hyetograph to distribute rainfall across the subcatchments over the storm duration. Based on guidance in Hydrologic Analysis of Ungaged Watersheds Using HEC-1, the ne sted storm distribution was selected for the study (USACE 1982). The nested storm provides the peak intensities necessary to assess drainage infrastructure at the inlet scale (up to 5-minute rainfall intensities) while preserving the total volume of runoff generated from the storm duration.

2.1.2 Rainfall Hyetograph Development
To develop the unit intensity duration relationship for the study area, NOAA precipitation depth data from the centroids of the Agua Hedionda, Buena Vista, and San Luis Rey were obtained for the 2-, 10-, 100- year, 24-hour, and the 1-year, 1-hour storm events. Rainfall data obtained from the NOAA PFDS was used 08/12/2025
C7
93 of 237

2 to generate an updated intensity-duration relation ship for use within the study area. The 100-year precipitation depth data from these rain gages, and the City of Vista study area is shown in Figure 2-1 (NOAA 2011).

Figure 2-1: 100-year, 24-hour precipitation depth
The resulting rainfall intensity-duration data points generated from the NOAA precipitation depth data were reviewed and plotted for comparison (NOAA 2011). This was done to visually identify any discrepancy in the intensity-duration pairs when plotte d. The intensity-duration pairs will appear linear on a log-log scale. When plotted, the rainfall data collected at the centroids of the drainage basins yielded a linear intensity-duration relationship (Figure 2-2). Th is plot provides a comparison of the 100-year 24- hour precipitation intensities for the drainage basins with the project area centroid. 0 1
2 3
4 5
6 0 200 400 600 800 1000 1200 1400 1600
Precipitation (inches)
Time (min)
100-Year 24-Hour Precipitation
NOAA Atlas 14 - Vista, CA
Agua Hedionda
Buena Vista
San Luis Rey
08/12/2025
C7
94 of 237

3 Figure 2-2. 100-year intensity-duration relationship.

Though the intensities plotted exhibit similar patterns for the centroids of the drainage basins and the project area for the City, relationship of magnitude of intensity for each drainage basin varied with the intensity of the center of the study area. It was de termined that the rainfall data aggregated for each drainage basin would be appropriate for modeling purposes. The precipitation data pairs were entered in 5-minute increments. Precipitation de pths at certain durations were obtained directly from NOAA Atlas 14 (NOAA 2011). Precipitation depths bounded by the given values were determined by log-log interpolation at 5-minute increments.

The incremental precipitation data was then arranged into a (2/3, 1/3) rainfall distribution with the storm peak occurring at 16 hours, as described in the 2003 San Diego County Hydrology Manual, hyetograph, as seen in
Figure 2-3.

0.1 1
10 55 0 5 0 0
Rainfall Intensity (inches/hour)
Time (min)
100-Year 24-Hour Intensity-Duration
NOAA Atlas 14 - Vista, CA
Agua
Hedionda
Buena Vista
San Luis Rey
08/12/2025
C7
95 of 237

4 Figure 2-3: 100-year, 24-hour intensity hyetograph

2.2 Hydrologic Modeling
The developed hyetographs were imported into PCSWMM as a DAT file with 5-minute time steps. Both the existing and proposed condition H&H models utilized the data from the hyetographs to generate the runoff hydrographs for each subcatchment. Refer to Section 2.0 of this memo for more information regarding the hydraulic analysis methodology and modeling approach.

PCSWMM uses EPA’s SWMM Version 5 (SWMM5) engine, which uses the nonlinear reservoir modeling methodology to estimate the rainfall-runoff relationship for a subarea. Nonlinear reservoir modeling uses a combination of mass conservation and the Manning E quation to determine the volumetric flow rate from a subcatchment. SWMM5 requires several para meters to calibrate each subcatchment. The parameters include:
• area (in acres),
• characteristic width of the subcatchment,
• slope,
• percent impervious,
• Manning’s “n” values for pervious and impervious overland surfaces, • depression storage for pervious and impervious surfaces, • percent of impervious area with no depression storage, and • infiltration parameters.

0.00 0.50

1.00 1.50

2.00 2.50

3.00 3.50

4.00 4.50

5.00 0.00

0.50 1.00

1.50 2.00

2.50 3.00

3.50 4.00

4.50 5.00
4:00 8:00 12:00 16:00 20:00 24:00
Rainfall Intensity (inches/Hour)
Total Precipitation (inches)
Time (HH:MM)
100-Year, 24 Hour Storm Event Rainfall Intensity Hyetograph Agua Hedionda Basin, Vista DMP
Total Precipitation (inches)
Intensity (inches/hour)
08/12/2025
C7
96 of 237

5 The Green-Ampt Method was used to estimate infiltration potential, which requires the following parameters: soil capillary suction head, soil saturated hydraulic conductivity, and initial moisture deficit (i.e., the difference between soil porosity and initial moisture content). This method was chosen over the others because it considers variable water content conditions.

Each subcatchment is connected via a conveyance node and link network (e.g., inlets and pipes), which routes runoff generated toward the storm drain system outfall. Refer to Section 2.0 for more information regarding the hydraulic analysis methodology and modeling procedures.

The overland Manning’s “n” values are: 0.012 for impervious cover, and 0.10 for pervious cover. These values are further documented in Table 3-5 of the Storm Water Management Model Reference Manual Volume I – Hydrology (2016).

The land cover feature class was used to determine the percent impervious for each subcatchment based on assigned impervious percentages to each land use. The land use shapes were intersected with the inlet drainage area delineations to perform an area-weighting analysis of the average impervious cover. Refer to Appendix B for a map which documents the land uses throughout the study area and the assigned impervious percentage for each land use.

Soil parameters were obtained using Appendi x G of the Model BMP Design Manual (2018). The distribution of hydrologic soil groups within the st udy area is based on the USA Soils Hydrologic Group ArcGIS feature class for National Resources Conservation Service hydrologic soil groups (refer to appendix B for an exhibit documenting the mapped NRCS hydrologic soil groups within the study area).

3.0 Hydraulics - Methodology

3.1 Flow Routing
The PCSWMM platform uses SWMM5 to perform hydraulic calculations and presents flow routing options to be selected for the model. Flow routing is go verned by the equations of continuity, mass, and momentum—also known as the St. Venant Flow eq uations—with flexibility offered to the modeler regarding the complexity of the terms considered in the equations. The program allows the modeler to select from the Steady Flow, Kinematic Wave, and Dynamic Wave routing options. The Manning normal depth equation is used in all routing options to relate flow depth, flow rate, and surface friction.

Steady Flow routing was judged to be inappropriate for modeling this study area as it does not represent flow routing per a defined time step during the simulation. It is the simplest computation method that translates the inflow hydrographs directly downstream without any change in shape and simply uses the normal depth equations to relate flow rates, depths, and cross-sectional areas of the conveyance network.

This method does not represent any backwater effects or pressurized flow and does not consider the user- defined computational time steps during the storm simulation.

Kinematic Wave routing was not selected for this study as it was incompatible with the 2-D analysis. It employs a simplified form of the momentum equation but does not consider all of the equation’s terms.

This routing method does not account for any backwater effects or pressurized flow.

08/12/2025
C7
97 of 237

6 Dynamic Wave routing was the option selected for all analyses performed in this study. The purpose of this study was to produce a model that would most closely relate the actual conditions of the dynamic relationship between surface and subsurface convey ance, and potential flooding concerns. This routing option considers all terms of the St. Venant Flow equations and presents the most theoretically correct results accounting for backwater effects, pressurized flow, flow attenuation, and reversal of flow. The caveat in selecting this routing option, however, was maintaining numerical stability in the model by using extremely small computational time st eps that resulted in significant simulation times for 2-D analyses.

The time steps must be small enou gh to analyze the short conduits in the model so the computational time steps were based on the shortest conduit and checked through a simplified Courant equation.

3.2 Conveyance Material and Manning’s Roughness Coefficients In PCSWMM, the Manning roughness values are associat ed with a conveyance material database. Each channel, pipe, and conduit in the 1-D portion of the model must have a material code assigned to it; in that way, the resistance to flow and energy losses along the conduit length can be calculated.

Table
3-1 lists the material types and the associated Manning’s “n” value assigned to each material code in the models. The Manning’s conduit roughness values were assigned based on table 3-4 of the Urban Drainage Design Manual (Federal Highway Administration, 2009). Manning’s overland “n” values for subcatchment routing were selected using the Storm Water Management Model Reference Manual Volume I - Hydrology as reference (Rossman 2016).

Table 3-1. Conveyance material abbreviations and Manning’s roughness coefficients Material Roughness Description
CMP 0.024 Corrugated Metal Pipe
PVC 0.013 Polyvinyl Chloride
RCP 0.013 Reinforced Concrete Pipe

3.3 Storm Water Inlet Modeling
The initial storm drain inventory includes 1,861 inlet or catch basin structures for the collection of surface runoff from streets, ditches, swales, and overland flow. Undersized storm water inlets can limit the efficiency of the existing conveyance infrastructu re to collect and convey runoff during storm events; however, detailed sizes of each inlet and type are needed to assess in the model. For the purposes of this DMP study, the model assumes the approach flow can enter the inlet, and the potential restriction for conveyance is being modeled based on the size of the outgoing pipe and required head to allow conveyance in the pipe. If the pipe is a limiting fa ctor, then the portion of storm water flows exceeding the capacity of the outgoing pipe (from each inlet) is bypassed along the surface via street conveyance in the dual drainage models.

3.4 1-D Dual Drainage Model
The development of the 1-D hydraulic model includes development of a • Minor System: Pipe/open channel drainage network for all pipes 18-inches and larger. Pertinent pipes having less than 18-inch diameters also were included in the model if they were considered part of the primary backbone storm drain system s. Key hydraulic structures such as culverts, 08/12/2025
C7
98 of 237

7 outfalls, and pipes also were included in the 1-D model, as were hydraulic structures that control the flow entering or discharging from the primary system, and • Major System: Conveyance features parallel to the storm drain and represents street flow. These features reflect a typical street cross section.

A dual drainage model is created by connecting th e minor and major systems. The major and minor systems are linked at points where exchange of storm water between the surface conveyance system and the engineered storm water conveyance system coul d occur—typically at storm drain inlets, manholes, connectors, headwalls, and outlet structures. This a pproach allows for conservation of total flow when minor system capacity is exceeded. The dual drainage model was then run and solved, representing the storm water conveyance on the street and in the sub-surface storm water conveyance system.

The 1-D dual drainage model was executed based on general plan land uses using the runoff hydrographs resulting from NOAA rainfalls for the 2-, 10-, and 100-year, 24-hour storm events; and the 1-year, 1-hour storm event was run to identify potential locations for state trash capture compliance purposes.

3.5 Conveyance Capacity
The capacities of the storm drain system were e valuated based on the 2014 San Diego Hydraulic Manual criteria that the hydraulic grade line is maintained 1- foot below the ground surface or gutter flow.

Conduits are flagged if their upstream junction is within 1-foot of the ground elevation or modelled as surcharging. A headwall or junction that has the same rim and invert elevations used a measurement of invert elevation plus height of pipe plus 2- feet as the ground elevation from which to measure surcharging depths.

08/12/2025
C7
99 of 237

8 Agua Hedionda Basin Centroid Data

08/12/2025
C7
100 of 237

9 08/12/2025
C7
101 of 237

10 Buena Vista Basin Centroid Data

08/12/2025
C7
102 of 237

11 08/12/2025
C7
103 of 237

12 San Luis Rey Basin Centroid Data

08/12/2025
C7
104 of 237

13 08/12/2025
C7
105 of 237

C. GIS Dataset Exhibits

08/12/2025
C7
106 of 237
Ground Surface Elevation Map

CMTC TRASH ORDER DRAINAGE MASTER PLAN
LEGEND
City of Vista
Ground Surface Elevation (Ft)

3.0255
1756.86
\\cp.rickeng.com\projects\WMP\19378_VistaDMP\GIS\Pro\VistaDMP_FactSheet\VistaDMP_FactSheet.aprx Data Sources: City of Vista, SANGIS, SADAG
3,000 0 3,000
Feet T
08/12/2025
C7
107 of 237
General Plan Land Use Map

CMTC TRASH ORDER DRAINAGE MASTER PLAN
LEGEND
City of Vista
Residential
Rural Residential
Low Density Residential
Medium-Low Density Residential
Medium Density Residential
Medium-High Density Residential
High Density Residential
Mixed Use
Open Space Residential
Commercial
Commercial
Commercial Office
Commercial Service
Neighborhood Commercial
Parks and Open Space
Active Parks
Passive Parks
Parks and Recreation
Open Space Reserves & Preserves
Open Space
Water
Other Services
Civil Activity
Agriculture
Auto Dealership
Research Light Industrial
Light Industry
Heavy Industry
Industrial General
Transportation and Other
Freeway
Other Transportation and Maintenance
Parking
Railroad Right-of-Way
\\cp.rickeng.com\projects\WMP\19378_VistaDMP\GIS\Pro\VistaDMP_FactSheet\VistaDMP_FactSheet.aprx Data Sources: City of Vista, SANGIS, SADAG
4,000 0 4,000
Feet T
08/12/2025
C7
108 of 237
Hydrologic Soils Group Map

CMTC TRASH ORDER DRAINAGE MASTER PLAN
LEGEND
City of Vista
Hydrologic Soil Type
A
B
C
D
\\cp.rickeng.com\projects\WMP\19378_VistaDMP\GIS\Pro\VistaDMP_FactSheet\VistaDMP_FactSheet.aprx Data Sources: City of Vista, SANGIS, SADAG
3,000 0 3,000
Feet T
08/12/2025
C7
109 of 237

D. Trash Strategies

08/12/2025
C7
110 of 237
P:\Projects\SW0337_VistaTrashMasterPlan\04_Technical\4.01_GIS\05_ArcPRO\ProProject\ProjectExhibits\ProjectExhibits.aprx; May2022

Page 70 ends

Feet
¯
Channel
Flowline
Storm Drain
Culvert
Ditch
Other
Potential Structural Opportunity*
Drainage Area*
City of Vista
Developed Area
Priority Land Use
Detention Basin
VISTA
SA
S12

ASSIIIISSIIIIIIIIIIIS ATTTTTTAAAAI ATAVIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIISSIIIIIIIIIIIISIIIISSSVVIIIVVVVVVVVVVVVVVVVVVVVVVVVVVVVIIIIIIIIVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVV TTTSSSSSSSSSSSSSSSSSSSSSSSSSSIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIISSSSSSSSSSSSSSSSSSSSSSSSSSSSSTTSS AAAAATAAAAATTAATAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAVVVVVVVIIIIVVVIIIIIIIIIIIIIIIIIVVVVVVVVVVVVVVVVVVVVVVIIIIIIIIIIIIIIIIISSSSSSSSSSSSTTTTTTSTTSSSSSTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAATATTAAAATAAAAAATTTTTTTTTTATTTTTATTTTTTTAAAAAAAAAAAAASSSSTTTTTTTTTTTTTTTTVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVV AAAAAAAAAAAAASSSSSSSSSSSSSSSTTSTTSTTSTTTTTTTTTTTSSSSTSSSSSSSSSTSSTSSIIIIIIIIIIIIIIIIIIIIISSSSIIIIIIIIIIIIIIIIIVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVIIVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVISSSSIIIIIIIIIIIIIIIIIIIIIIIIIIIISSIIIIIIIIIIIIISSISIIIIIIIIIIIIIIISSIISSSSSSSSSSSSSSSSSSSSSSSSSSSSSS DEVICE
TYPE

DRAINAGE AREA
(acres)

PLU AREA
(acres)

TRASH FLOW
(cfs)
100-YR FLOW
(cfs)
439 167HDS
BV-3: BV-C02884
141 714
Potential Structural Opportunity
*Opportunities and drainage areas are preliminary, based on available desktop information at the time of this report. Drainage areas and opportunity attributes should be verified as part of subsequent project planning and design. Additional opportunities may exist.

Potential structural
opportunity identified
based on Screening
Based on (Proposed) Priority Land Uses
Trash event flow from
modified PCSWMM Model
From Exisitng Conditions
Drainage Model
Drainage Area aggregated
from Existing Conditions
Drainage Model
Developed Area is all land uses
except Open Spaces and Open
Space Residential
Priority Land Uses
Based on (Proposed)
Structural Opportunity ID
Conduit Name
Key Map
08/12/2025
C7
111 of 237
P:\Projects\SW0337_VistaTrashMasterPlan\04_Technical\4.01_GIS\05_ArcPRO\ProProject\PotentialStrucOpps_LayoutMap.aprx; May2022

Page 1 ends

0 4,000 8,000
Feet
¯
Channel
Flowline
Storm Drain
Culvert
Ditch
Other
Potential Structural Opportunity*
Drainage Area*
City of Vista
Developed Area
Priority Land Use
Detention Basin
Potential Structural Opportunities
Overview Map
*Opportunities and drainage areas are preliminary, based on available desktop information at the time of this report. Drainage areas and opportunity attributes should be verified as part of subsequent project planning and design.

Additional opportunities may exist.
08/12/2025
C7
112 of 237

VISTA VIL
LA

GE VALE T ERRACE

CIVIC CE
NTER

FOOTHIL
L

BOB IER

VAL E TER RACE
VISTA
P:\Projects\SW0337_VistaTrashMasterPlan\04_Technical\4.01_GIS\05_ArcPRO\ProProject\ProjectExhibits\ProjectExhibits.aprx; May2022

Page 20 ends

Feet
¯
Channel
Flowline
Storm Drain
Culvert
Ditch
Other
Potential Structural Opportunity*
Drainage Area*
City of Vista
Developed Area
Priority Land Use
Detention Basin
S14SAN LUIS
REY
VISTA

SAN MARCOS
S11
DEVICE
TYPE

DRAINAGE AREA
(acres)

PLU AREA
(acres)

TRASH FLOW
(cfs)
100-YR FLOW
(cfs)
1233 9Retrofit
BT-Basin: Brengle T errace Detention Basin
31 1508
Potential Structural Opportunity
*Opportunities and drainage areas are preliminary, based on available desktop information at the time of this report. Drainage areas and opportunity attributes should be verified as part of subsequent project planning and design. Additional opportunities may exist. 08/12/2025
C7
113 of 237
MAIN

CIVIC CENTE

RVISTA VIL
LAGE

VALE TERRA CE
OCEAN
SIDE
OLIVE
BOBIER

VISTASANTA FE

MELROSE

SANTA FE
P:\Projects\SW0337_VistaTrashMasterPlan\04_Technical\4.01_GIS\05_ArcPRO\ProProject\ProjectExhibits\ProjectExhibits.aprx; May2022

Page 30 ends

Feet
¯
Channel
Flowline
Storm Drain
Culvert
Ditch
Other
Potential Structural Opportunity*
Drainage Area*
City of Vista
Developed Area
Priority Land Use
Detention Basin
S14SAN LUIS
REY
VISTA

SAN MARCOS
S11
DEVICE
TYPE

DRAINAGE AREA
(acres)

PLU AREA
(acres)

TRASH FLOW
(cfs)
100-YR FLOW
(cfs)
867 217Baffle Box
BV-2: BV-C04940
268 750
Potential Structural Opportunity
*Opportunities and drainage areas are preliminary, based on available desktop information at the time of this report. Drainage areas and opportunity attributes should be verified as part of subsequent project planning and design. Additional opportunities may exist. 08/12/2025
C7
114 of 237
MAIN
OLIVE

VALE TERRACE

VISTA V
ILLAGE
VISTA
CIV

IC CENT
ER

VALE TERR ACE

FOOTHIL
L

MONTE VIST A
BUENA
CREE
K

SANTA FE

SANTA FE

SANTA FE
SR-78 EB
SR-78 EB
SR-78 WB
SR-78 WB
P:\Projects\SW0337_VistaTrashMasterPlan\04_Technical\4.01_GIS\05_ArcPRO\ProProject\ProjectExhibits\ProjectExhibits.aprx; May2022

Page 40 ends

Feet
¯
Channel
Flowline
Storm Drain
Culvert
Ditch
Other
Potential Structural Opportunity*
Drainage Area*
City of Vista
Developed Area
Priority Land Use
Detention Basin
S14SAN LUIS
REY
VISTA

SAN MARCOS
S11
DEVICE
TYPE

DRAINAGE AREA
(acres)

PLU AREA
(acres)

TRASH FLOW
(cfs)
100-YR FLOW
(cfs)
841 26Retrofit
SSF-Basin: S Santa Fe Detention Basin
70 313
Potential Structural Opportunity
*Opportunities and drainage areas are preliminary, based on available desktop information at the time of this report. Drainage areas and opportunity attributes should be verified as part of subsequent project planning and design. Additional opportunities may exist. 08/12/2025
C7
115 of 237
CANNON
M
ELROSE
LAKE
M
ELRO
SE
SYCAM
OR
E

SHADOW RIDGE
SR-78 WB
SR-78 EB
P:\Projects\SW0337_VistaTrashMasterPlan\04_Technical\4.01_GIS\05_ArcPRO\ProProject\ProjectExhibits\ProjectExhibits.aprx; May2022

Page 50 ends

Feet
¯
Channel
Flowline
Storm Drain
Culvert
Ditch
Other
Potential Structural Opportunity*
Drainage Area*
City of Vista
Developed Area
Priority Land Use
Detention Basin
S14SAN LUIS
REY
VISTA

SAN MARCOS
S11
DEVICE
TYPE

DRAINAGE AREA
(acres)

PLU AREA
(acres)

TRASH FLOW
(cfs)
100-YR FLOW
(cfs)
617 104HDS
AH-3: AH-C02620
49 145
Potential Structural Opportunity
*Opportunities and drainage areas are preliminary, based on available desktop information at the time of this report. Drainage areas and opportunity attributes should be verified as part of subsequent project planning and design. Additional opportunities may exist. 08/12/2025
C7
116 of 237
FOOTH
IL
L
MAIN

VALE TERRACE

VISTA VILLAGE
VISTA
CIVIC
CENTER

VALE TERRACE

MONTE VISTA
SAN
TA FE
SR-78 EB
SR-78 WB
P:\Projects\SW0337_VistaTrashMasterPlan\04_Technical\4.01_GIS\05_ArcPRO\ProProject\ProjectExhibits\ProjectExhibits.aprx; May2022

Page 60 ends

Feet
¯
Channel
Flowline
Storm Drain
Culvert
Ditch
Other
Potential Structural Opportunity*
Drainage Area*
City of Vista
Developed Area
Priority Land Use
Detention Basin
S14SAN LUIS
REY
VISTA

SAN MARCOS
S11
DEVICE
TYPE

DRAINAGE AREA
(acres)

PLU AREA
(acres)

TRASH FLOW
(cfs)
100-YR FLOW
(cfs)
474 41HDS
BV-9: BV-C03942
29 28
Potential Structural Opportunity
*Opportunities and drainage areas are preliminary, based on available desktop information at the time of this report. Drainage areas and opportunity attributes should be verified as part of subsequent project planning and design. Additional opportunities may exist. 08/12/2025
C7
117 of 237

MELROSE
MAIN
VISTA

EMERALD
CIVIC
CENTER
VISTA

VISTA VILLAGE
BOBIER

OCEANSIDE
MELR
OSE

SANTA FE
OLIVE
SR-78 EBSR-78 WB
P:\Projects\SW0337_VistaTrashMasterPlan\04_Technical\4.01_GIS\05_ArcPRO\ProProject\ProjectExhibits\ProjectExhibits.aprx; May2022

Page 70 ends

Feet
¯
Channel
Flowline
Storm Drain
Culvert
Ditch
Other
Potential Structural Opportunity*
Drainage Area*
City of Vista
Developed Area
Priority Land Use
Detention Basin
S14SAN LUIS
REY
VISTA

SAN MARCOS
S11
DEVICE
TYPE

DRAINAGE AREA
(acres)

PLU AREA
(acres)

TRASH FLOW
(cfs)
100-YR FLOW
(cfs)
439 167HDS
BV-3: BV-C02884
141 714
Potential Structural Opportunity
*Opportunities and drainage areas are preliminary, based on available desktop information at the time of this report. Drainage areas and opportunity attributes should be verified as part of subsequent project planning and design. Additional opportunities may exist. 08/12/2025
C7
118 of 237

OSBORNE
VISTA
P:\Projects\SW0337_VistaTrashMasterPlan\04_Technical\4.01_GIS\05_ArcPRO\ProProject\ProjectExhibits\ProjectExhibits.aprx; May2022

Page 80 ends

Feet
¯
Channel
Flowline
Storm Drain
Culvert
Ditch
Other
Potential Structural Opportunity*
Drainage Area*
City of Vista
Developed Area
Priority Land Use
Detention Basin
S14SAN LUIS
REY
VISTA

SAN MARCOS
S11
DEVICE
TYPE

DRAINAGE AREA
(acres)

PLU AREA
(acres)

TRASH FLOW
(cfs)
100-YR FLOW
(cfs)
203 36HDS
SL-1: SL-C03455
36 255
Potential Structural Opportunity
*Opportunities and drainage areas are preliminary, based on available desktop information at the time of this report. Drainage areas and opportunity attributes should be verified as part of subsequent project planning and design. Additional opportunities may exist. 08/12/2025
C7
119 of 237
P:\Projects\SW0337_VistaTrashMasterPlan\04_Technical\4.01_GIS\05_ArcPRO\ProProject\ProjectExhibits\ProjectExhibits.aprx; May2022

Page 90 ends

Feet
¯
Channel
Flowline
Storm Drain
Culvert
Ditch
Other
Potential Structural Opportunity*
Drainage Area*
City of Vista
Developed Area
Priority Land Use
Detention Basin

SAN LUIS
REY
VISTA

SAN MARCOS
S12
DEVICE
TYPE

DRAINAGE AREA
(acres)

PLU AREA
(acres)

TRASH FLOW
(cfs)
100-YR FLOW
(cfs)
191 124HDS
AH-2: AH-C04706
65 376
Potential Structural Opportunity
*Opportunities and drainage areas are preliminary, based on available desktop information at the time of this report. Drainage areas and opportunity attributes should be verified as part of subsequent project planning and design. Additional opportunities may exist. 08/12/2025
C7
120 of 237
P:\Projects\SW0337_VistaTrashMasterPlan\04_Technical\4.01_GIS\05_ArcPRO\ProProject\ProjectExhibits\ProjectExhibits.aprx; May2022

Page 100 ends

Feet
¯
Channel
Flowline
Storm Drain
Culvert
Ditch
Other
Potential Structural Opportunity*
Drainage Area*
City of Vista
Developed Area
Priority Land Use
Detention Basin

SAN LUIS
REY
VISTA

SAN MARCOS
S12
DEVICE
TYPE

DRAINAGE AREA
(acres)

PLU AREA
(acres)

TRASH FLOW
(cfs)
100-YR FLOW
(cfs)
174 43HDS
BV-4: BV-C03391
54 194
Potential Structural Opportunity
*Opportunities and drainage areas are preliminary, based on available desktop information at the time of this report. Drainage areas and opportunity attributes should be verified as part of subsequent project planning and design. Additional opportunities may exist. 08/12/2025
C7
121 of 237
P:\Projects\SW0337_VistaTrashMasterPlan\04_Technical\4.01_GIS\05_ArcPRO\ProProject\ProjectExhibits\ProjectExhibits.aprx; May2022

Page 110 ends

Feet
¯
Channel
Flowline
Storm Drain
Culvert
Ditch
Other
Potential Structural Opportunity*
Drainage Area*
City of Vista
Developed Area
Priority Land Use
Detention Basin

SAN LUIS
REY
VISTA

SAN MARCOS
S12
DEVICE
TYPE

DRAINAGE AREA
(acres)

PLU AREA
(acres)

TRASH FLOW
(cfs)
100-YR FLOW
(cfs)
151 45HDS
BV-6: BV-C03019
52 196
Potential Structural Opportunity
*Opportunities and drainage areas are preliminary, based on available desktop information at the time of this report. Drainage areas and opportunity attributes should be verified as part of subsequent project planning and design. Additional opportunities may exist. 08/12/2025
C7
122 of 237

VALE TER RACE

BO BIER
VI STA

SANTA FE
P:\Projects\SW0337_VistaTrashMasterPlan\04_Technical\4.01_GIS\05_ArcPRO\ProProject\ProjectExhibits\ProjectExhibits.aprx; May2022

Page 120 ends

Feet
¯
Channel
Flowline
Storm Drain
Culvert
Ditch
Other
Potential Structural Opportunity*
Drainage Area*
City of Vista
Developed Area
Priority Land Use
Detention Basin
S14SAN LUIS
REY
VISTA

SAN MARCOS
S11
DEVICE
TYPE

DRAINAGE AREA
(acres)

PLU AREA
(acres)

TRASH FLOW
(cfs)
100-YR FLOW
(cfs)
130 37HDS
BV-16: BV-C03061
10 56
Potential Structural Opportunity
*Opportunities and drainage areas are preliminary, based on available desktop information at the time of this report. Drainage areas and opportunity attributes should be verified as part of subsequent project planning and design. Additional opportunities may exist. 08/12/2025
C7
123 of 237
CIV
IC
CENTER

MONTE VISTA

SANTA FE

SANTA FE
SR-78 EB
SR-78 EB
SR-78 WB
SR-78 WB
SR-78 WB
P:\Projects\SW0337_VistaTrashMasterPlan\04_Technical\4.01_GIS\05_ArcPRO\ProProject\ProjectExhibits\ProjectExhibits.aprx; May2022

Page 130 ends

Feet
¯
Channel
Flowline
Storm Drain
Culvert
Ditch
Other
Potential Structural Opportunity*
Drainage Area*
City of Vista
Developed Area
Priority Land Use
Detention Basin
S14SAN LUIS
REY
VISTA

SAN MARCOS
S11
DEVICE
TYPE

DRAINAGE AREA
(acres)

PLU AREA
(acres)

TRASH FLOW
(cfs)
100-YR FLOW
(cfs)
126 25HDS
BV-7: BV-C04664
45 208
Potential Structural Opportunity
*Opportunities and drainage areas are preliminary, based on available desktop information at the time of this report. Drainage areas and opportunity attributes should be verified as part of subsequent project planning and design. Additional opportunities may exist. 08/12/2025
C7
124 of 237
LAKE

VISTA WY

EMERALD

COLLEGE
VISTA
SR-78 WB
SR-78 WB
SR-78 EB
SR-78 EB
SR-78 EB
SR-78 EB
P:\Projects\SW0337_VistaTrashMasterPlan\04_Technical\4.01_GIS\05_ArcPRO\ProProject\ProjectExhibits\ProjectExhibits.aprx; May2022

Page 140 ends

Feet
¯
Channel
Flowline
Storm Drain
Culvert
Ditch
Other
Potential Structural Opportunity*
Drainage Area*
City of Vista
Developed Area
Priority Land Use
Detention Basin
S14SAN LUIS
REY
VISTA

SAN MARCOS
S11
DEVICE
TYPE

DRAINAGE AREA
(acres)

PLU AREA
(acres)

TRASH FLOW
(cfs)
100-YR FLOW
(cfs)
121 53HDS
BV-8: BV-C01529
41 187
Potential Structural Opportunity
*Opportunities and drainage areas are preliminary, based on available desktop information at the time of this report. Drainage areas and opportunity attributes should be verified as part of subsequent project planning and design. Additional opportunities may exist. 08/12/2025
C7
125 of 237
P:\Projects\SW0337_VistaTrashMasterPlan\04_Technical\4.01_GIS\05_ArcPRO\ProProject\ProjectExhibits\ProjectExhibits.aprx; May2022

Page 150 ends

Feet
¯
Channel
Flowline
Storm Drain
Culvert
Ditch
Other
Potential Structural Opportunity*
Drainage Area*
City of Vista
Developed Area
Priority Land Use
Detention Basin

SAN LUIS
REY
VISTA

SAN MARCOS
S12
DEVICE
TYPE

DRAINAGE AREA
(acres)

PLU AREA
(acres)

TRASH FLOW
(cfs)
100-YR FLOW
(cfs)
110 100HDS
AH-9: AH-C02146
34 155
Potential Structural Opportunity
*Opportunities and drainage areas are preliminary, based on available desktop information at the time of this report. Drainage areas and opportunity attributes should be verified as part of subsequent project planning and design. Additional opportunities may exist. 08/12/2025
C7
126 of 237
P:\Projects\SW0337_VistaTrashMasterPlan\04_Technical\4.01_GIS\05_ArcPRO\ProProject\ProjectExhibits\ProjectExhibits.aprx; May2022

Page 160 ends

Feet
¯
Channel
Flowline
Storm Drain
Culvert
Ditch
Other
Potential Structural Opportunity*
Drainage Area*
City of Vista
Developed Area
Priority Land Use
Detention Basin

SAN LUIS
REY
VISTA

SAN MARCOS
S12
DEVICE
TYPE

DRAINAGE AREA
(acres)

PLU AREA
(acres)

TRASH FLOW
(cfs)
100-YR FLOW
(cfs)
110 39HDS
AH-8: AH-C04130
35 242
Potential Structural Opportunity
*Opportunities and drainage areas are preliminary, based on available desktop information at the time of this report. Drainage areas and opportunity attributes should be verified as part of subsequent project planning and design. Additional opportunities may exist. 08/12/2025
C7
127 of 237
P:\Projects\SW0337_VistaTrashMasterPlan\04_Technical\4.01_GIS\05_ArcPRO\ProProject\ProjectExhibits\ProjectExhibits.aprx; May2022

Page 170 ends

Feet
¯
Channel
Flowline
Storm Drain
Culvert
Ditch
Other
Potential Structural Opportunity*
Drainage Area*
City of Vista
Developed Area
Priority Land Use
Detention Basin

SAN LUIS
REY
VISTA

SAN MARCOS
S12
DEVICE
TYPE

DRAINAGE AREA
(acres)

PLU AREA
(acres)

TRASH FLOW
(cfs)
100-YR FLOW
(cfs)
107 26Baffle Box
BV-10: BV-C03314
31 166
Potential Structural Opportunity
*Opportunities and drainage areas are preliminary, based on available desktop information at the time of this report. Drainage areas and opportunity attributes should be verified as part of subsequent project planning and design. Additional opportunities may exist. 08/12/2025
C7
128 of 237
P:\Projects\SW0337_VistaTrashMasterPlan\04_Technical\4.01_GIS\05_ArcPRO\ProProject\ProjectExhibits\ProjectExhibits.aprx; May2022

Page 180 ends

Feet
¯
Channel
Flowline
Storm Drain
Culvert
Ditch
Other
Potential Structural Opportunity*
Drainage Area*
City of Vista
Developed Area
Priority Land Use
Detention Basin

SAN LUIS
REY
VISTA

SAN MARCOS
S12
DEVICE
TYPE

DRAINAGE AREA
(acres)

PLU AREA
(acres)

TRASH FLOW
(cfs)
100-YR FLOW
(cfs)
105 90HDS
AH-6: AH-C02519
42 271
Potential Structural Opportunity
*Opportunities and drainage areas are preliminary, based on available desktop information at the time of this report. Drainage areas and opportunity attributes should be verified as part of subsequent project planning and design. Additional opportunities may exist. 08/12/2025
C7
129 of 237

EMERALD

COLLEGE
VISTA
SR-78 EB
SR-78 EB
SR-78 WB
SR-78 WB
SR-78 WB
P:\Projects\SW0337_VistaTrashMasterPlan\04_Technical\4.01_GIS\05_ArcPRO\ProProject\ProjectExhibits\ProjectExhibits.aprx; May2022

Page 190 ends

Feet
¯
Channel
Flowline
Storm Drain
Culvert
Ditch
Other
Potential Structural Opportunity*
Drainage Area*
City of Vista
Developed Area
Priority Land Use
Detention Basin
S14SAN LUIS
REY
VISTA

SAN MARCOS
S11
DEVICE
TYPE

DRAINAGE AREA
(acres)

PLU AREA
(acres)

TRASH FLOW
(cfs)
100-YR FLOW
(cfs)
99 40HDS
BV-5: BV-C11891
33 114
Potential Structural Opportunity
*Opportunities and drainage areas are preliminary, based on available desktop information at the time of this report. Drainage areas and opportunity attributes should be verified as part of subsequent project planning and design. Additional opportunities may exist. 08/12/2025
C7
130 of 237
P:\Projects\SW0337_VistaTrashMasterPlan\04_Technical\4.01_GIS\05_ArcPRO\ProProject\ProjectExhibits\ProjectExhibits.aprx; May2022

Page 200 ends

Feet
¯
Channel
Flowline
Storm Drain
Culvert
Ditch
Other
Potential Structural Opportunity*
Drainage Area*
City of Vista
Developed Area
Priority Land Use
Detention Basin

SAN LUIS
REY
VISTA

SAN MARCOS
S12
DEVICE
TYPE

DRAINAGE AREA
(acres)

PLU AREA
(acres)

TRASH FLOW
(cfs)
100-YR FLOW
(cfs)
96 20HDS
BV-13: BV-C05379
25 204
Potential Structural Opportunity
*Opportunities and drainage areas are preliminary, based on available desktop information at the time of this report. Drainage areas and opportunity attributes should be verified as part of subsequent project planning and design. Additional opportunities may exist. 08/12/2025
C7
131 of 237
P:\Projects\SW0337_VistaTrashMasterPlan\04_Technical\4.01_GIS\05_ArcPRO\ProProject\ProjectExhibits\ProjectExhibits.aprx; May2022

Page 210 ends

Feet
¯
Channel
Flowline
Storm Drain
Culvert
Ditch
Other
Potential Structural Opportunity*
Drainage Area*
City of Vista
Developed Area
Priority Land Use
Detention Basin

SAN LUIS
REY
VISTA

SAN MARCOS
S12
DEVICE
TYPE

DRAINAGE AREA
(acres)

PLU AREA
(acres)

TRASH FLOW
(cfs)
100-YR FLOW
(cfs)
95 84HDS
AH-5: AH-C05668_61
44 243
Potential Structural Opportunity
*Opportunities and drainage areas are preliminary, based on available desktop information at the time of this report. Drainage areas and opportunity attributes should be verified as part of subsequent project planning and design. Additional opportunities may exist. 08/12/2025
C7
132 of 237
P:\Projects\SW0337_VistaTrashMasterPlan\04_Technical\4.01_GIS\05_ArcPRO\ProProject\ProjectExhibits\ProjectExhibits.aprx; May2022

Page 220 ends

Feet
¯
Channel
Flowline
Storm Drain
Culvert
Ditch
Other
Potential Structural Opportunity*
Drainage Area*
City of Vista
Developed Area
Priority Land Use
Detention Basin

SAN LUIS
REY
VISTA

SAN MARCOS
S12
DEVICE
TYPE

DRAINAGE AREA
(acres)

PLU AREA
(acres)

TRASH FLOW
(cfs)
100-YR FLOW
(cfs)
91 25HDS
BV-11: BV-C04932
32 178
Potential Structural Opportunity
*Opportunities and drainage areas are preliminary, based on available desktop information at the time of this report. Drainage areas and opportunity attributes should be verified as part of subsequent project planning and design. Additional opportunities may exist. 08/12/2025
C7
133 of 237
P:\Projects\SW0337_VistaTrashMasterPlan\04_Technical\4.01_GIS\05_ArcPRO\ProProject\ProjectExhibits\ProjectExhibits.aprx; May2022

Page 230 ends

Feet
¯
Channel
Flowline
Storm Drain
Culvert
Ditch
Other
Potential Structural Opportunity*
Drainage Area*
City of Vista
Developed Area
Priority Land Use
Detention Basin

SAN LUIS
REY
VISTA

SAN MARCOS
S12
DEVICE
TYPE

DRAINAGE AREA
(acres)

PLU AREA
(acres)

TRASH FLOW
(cfs)
100-YR FLOW
(cfs)
86 16HDS
BV-15: BV-C01257
23 61
Potential Structural Opportunity
*Opportunities and drainage areas are preliminary, based on available desktop information at the time of this report. Drainage areas and opportunity attributes should be verified as part of subsequent project planning and design. Additional opportunities may exist. 08/12/2025
C7
134 of 237
P:\Projects\SW0337_VistaTrashMasterPlan\04_Technical\4.01_GIS\05_ArcPRO\ProProject\ProjectExhibits\ProjectExhibits.aprx; May2022

Page 240 ends

Feet
¯
Channel
Flowline
Storm Drain
Culvert
Ditch
Other
Potential Structural Opportunity*
Drainage Area*
City of Vista
Developed Area
Priority Land Use
Detention Basin

SAN LUIS
REY
VISTA

SAN MARCOS
S12
DEVICE
TYPE

DRAINAGE AREA
(acres)

PLU AREA
(acres)

TRASH FLOW
(cfs)
100-YR FLOW
(cfs)
78 37HDS
BV-12: BV-C03348
27 147
Potential Structural Opportunity
*Opportunities and drainage areas are preliminary, based on available desktop information at the time of this report. Drainage areas and opportunity attributes should be verified as part of subsequent project planning and design. Additional opportunities may exist. 08/12/2025
C7
135 of 237
P:\Projects\SW0337_VistaTrashMasterPlan\04_Technical\4.01_GIS\05_ArcPRO\ProProject\ProjectExhibits\ProjectExhibits.aprx; May2022

Page 250 ends

Feet
¯
Channel
Flowline
Storm Drain
Culvert
Ditch
Other
Potential Structural Opportunity*
Drainage Area*
City of Vista
Developed Area
Priority Land Use
Detention Basin

SAN LUIS
REY
VISTA

SAN MARCOS
S12
DEVICE
TYPE

DRAINAGE AREA
(acres)

PLU AREA
(acres)

TRASH FLOW
(cfs)
100-YR FLOW
(cfs)
74 13HDS
BV-14: BV-C03730
24 124
Potential Structural Opportunity
*Opportunities and drainage areas are preliminary, based on available desktop information at the time of this report. Drainage areas and opportunity attributes should be verified as part of subsequent project planning and design. Additional opportunities may exist. 08/12/2025
C7
136 of 237
P:\Projects\SW0337_VistaTrashMasterPlan\04_Technical\4.01_GIS\05_ArcPRO\ProProject\ProjectExhibits\ProjectExhibits.aprx; May2022

Page 260 ends

Feet
¯
Channel
Flowline
Storm Drain
Culvert
Ditch
Other
Potential Structural Opportunity*
Drainage Area*
City of Vista
Developed Area
Priority Land Use
Detention Basin

SAN LUIS
REY
VISTA

SAN MARCOS
S12
DEVICE
TYPE

DRAINAGE AREA
(acres)

PLU AREA
(acres)

TRASH FLOW
(cfs)
100-YR FLOW
(cfs)
69 49HDS
AH-12: AH-C02252
22 136
Potential Structural Opportunity
*Opportunities and drainage areas are preliminary, based on available desktop information at the time of this report. Drainage areas and opportunity attributes should be verified as part of subsequent project planning and design. Additional opportunities may exist. 08/12/2025
C7
137 of 237
P:\Projects\SW0337_VistaTrashMasterPlan\04_Technical\4.01_GIS\05_ArcPRO\ProProject\ProjectExhibits\ProjectExhibits.aprx; May2022

Page 270 ends

Feet
¯
Channel
Flowline
Storm Drain
Culvert
Ditch
Other
Potential Structural Opportunity*
Drainage Area*
City of Vista
Developed Area
Priority Land Use
Detention Basin

SAN LUIS
REY
VISTA

SAN MARCOS
S12
DEVICE
TYPE

DRAINAGE AREA
(acres)

PLU AREA
(acres)

TRASH FLOW
(cfs)
100-YR FLOW
(cfs)
67 58HDS
AH-10: AH-C02703
27 113
Potential Structural Opportunity
*Opportunities and drainage areas are preliminary, based on available desktop information at the time of this report. Drainage areas and opportunity attributes should be verified as part of subsequent project planning and design. Additional opportunities may exist. 08/12/2025
C7
138 of 237
P:\Projects\SW0337_VistaTrashMasterPlan\04_Technical\4.01_GIS\05_ArcPRO\ProProject\ProjectExhibits\ProjectExhibits.aprx; May2022

Page 280 ends

Feet
¯
Channel
Flowline
Storm Drain
Culvert
Ditch
Other
Potential Structural Opportunity*
Drainage Area*
City of Vista
Developed Area
Priority Land Use
Detention Basin

SAN LUIS
REY
VISTA

SAN MARCOS
S12
DEVICE
TYPE

DRAINAGE AREA
(acres)

PLU AREA
(acres)

TRASH FLOW
(cfs)
100-YR FLOW
(cfs)
66 45HDS
AH-11: AH-C04726
26 138
Potential Structural Opportunity
*Opportunities and drainage areas are preliminary, based on available desktop information at the time of this report. Drainage areas and opportunity attributes should be verified as part of subsequent project planning and design. Additional opportunities may exist. 08/12/2025
C7
139 of 237
P:\Projects\SW0337_VistaTrashMasterPlan\04_Technical\4.01_GIS\05_ArcPRO\ProProject\ProjectExhibits\ProjectExhibits.aprx; May2022

Page 290 ends

Feet
¯
Channel
Flowline
Storm Drain
Culvert
Ditch
Other
Potential Structural Opportunity*
Drainage Area*
City of Vista
Developed Area
Priority Land Use
Detention Basin

SAN LUIS
REY
VISTA

SAN MARCOS
S12
DEVICE
TYPE

DRAINAGE AREA
(acres)

PLU AREA
(acres)

TRASH FLOW
(cfs)
100-YR FLOW
(cfs)
66 11HDS
BV-17: BV-C01900
23 133
Potential Structural Opportunity
*Opportunities and drainage areas are preliminary, based on available desktop information at the time of this report. Drainage areas and opportunity attributes should be verified as part of subsequent project planning and design. Additional opportunities may exist. 08/12/2025
C7
140 of 237
P:\Projects\SW0337_VistaTrashMasterPlan\04_Technical\4.01_GIS\05_ArcPRO\ProProject\ProjectExhibits\ProjectExhibits.aprx; May2022

Page 300 ends

Feet
¯
Channel
Flowline
Storm Drain
Culvert
Ditch
Other
Potential Structural Opportunity*
Drainage Area*
City of Vista
Developed Area
Priority Land Use
Detention Basin

SAN LUIS
REY
VISTA

SAN MARCOS
S12
DEVICE
TYPE

DRAINAGE AREA
(acres)

PLU AREA
(acres)

TRASH FLOW
(cfs)
100-YR FLOW
(cfs)
59 29HDS
BV-18: BV-C01552
23 170
Potential Structural Opportunity
*Opportunities and drainage areas are preliminary, based on available desktop information at the time of this report. Drainage areas and opportunity attributes should be verified as part of subsequent project planning and design. Additional opportunities may exist. 08/12/2025
C7
141 of 237
P:\Projects\SW0337_VistaTrashMasterPlan\04_Technical\4.01_GIS\05_ArcPRO\ProProject\ProjectExhibits\ProjectExhibits.aprx; May2022

Page 310 ends

Feet
¯
Channel
Flowline
Storm Drain
Culvert
Ditch
Other
Potential Structural Opportunity*
Drainage Area*
City of Vista
Developed Area
Priority Land Use
Detention Basin

SAN LUIS
REY
VISTA

SAN MARCOS
S12
DEVICE
TYPE

DRAINAGE AREA
(acres)

PLU AREA
(acres)

TRASH FLOW
(cfs)
100-YR FLOW
(cfs)
57 19HDS
BV-20: BV-C03037
22 202
Potential Structural Opportunity
*Opportunities and drainage areas are preliminary, based on available desktop information at the time of this report. Drainage areas and opportunity attributes should be verified as part of subsequent project planning and design. Additional opportunities may exist. 08/12/2025
C7
142 of 237

EMERALD
VISTA
SR-78 WB
SR-78 WB
SR-78 EB
SR-78 EB
SR-78 EB
SR-78 EB
P:\Projects\SW0337_VistaTrashMasterPlan\04_Technical\4.01_GIS\05_ArcPRO\ProProject\ProjectExhibits\ProjectExhibits.aprx; May2022

Page 320 ends

Feet
¯
Channel
Flowline
Storm Drain
Culvert
Ditch
Other
Potential Structural Opportunity*
Drainage Area*
City of Vista
Developed Area
Priority Land Use
Detention Basin
S14SAN LUIS
REY
VISTA

SAN MARCOS
S11
DEVICE
TYPE

DRAINAGE AREA
(acres)

PLU AREA
(acres)

TRASH FLOW
(cfs)
100-YR FLOW
(cfs)
53 31HDS
BV-19: BV-C01616
22 110
Potential Structural Opportunity
*Opportunities and drainage areas are preliminary, based on available desktop information at the time of this report. Drainage areas and opportunity attributes should be verified as part of subsequent project planning and design. Additional opportunities may exist. 08/12/2025
C7
143 of 237
P:\Projects\SW0337_VistaTrashMasterPlan\04_Technical\4.01_GIS\05_ArcPRO\ProProject\PartialFullCap.aprx; May2022 0 4,000 8,000
Feet
¯
Drainage Area*
City of Vista
Developed Area
Priority Land Use
Existing Full Capture Area
Existing Partial Capture Area Trash Planning Map
*Opportunities and drainage areas are preliminary, based on available desktop information at the time of this report. Drainage areas and opportunity attributes should be verified as part of subsequent project planning and design.

Additional opportunities may exist.
08/12/2025
C7
144 of 237

E. Regional Opportunities

08/12/2025
C7
145 of 237

1 Background
Additional feasibility analysis was performed to iden tify four structural opportunities that can be integrated directly into the Capital Improvement Program (CIP) list. The feasibility analysis considered available as-builts and GIS data with focus on wet-utilities (stormwater, sewer), 2014 LiDAR topography, and a site visit conducted on October 11, 2022. Also, this feasibility analysis prioritized baffle boxes over hydrodynamic separators to reduce the depth within the systems to factor in the available hydraulic head and/or increase the ease of maintenance. Narrative for each of the selected four structural opportunities is presented below.

08/12/2025
C7
146 of 237

2 BV-2
Overview: BV-2 is located near the intersection of Redlands Street and West Orange Street. This regional opportunity receives runoff from 217 acres of PLU area and has a trash capture rate of 268 feet per second (CFS). The proposed design for BV-2 includes three (3) Contech 10-20 DSBBs with 54-inch diversion pipes.

A low flow diversion is proposed to intersect the existing 6.5-foot by 14.5-foot culvert approximately 100 feet upstream from the downstream headwall of the culvert and discharge treated water at the downstream headwall. The three DSBBs are to be loca ted along the east side of Redlands Street, each with its own inlet and outlet. The low flows are to split with a flow splitting device so each DSBB receives equal flow. After out-letting from the DSBBs the treated water would flow into a 54-inch pipe along the center of Redlands Street before discharging back into the channel. The invert depth of the proposed pipes for the DSBBs were approximately 7.4 feet below the surface. The feasibility of the BV-2 opportunity was determined using as-built drawing D3210 and GIS elevation data.

Opportunity and Constraints : This location had limited space because of the existing culvert and sewer line running along the centerline of Redlands Street. To avoid existing infrastructure, a linear design was proposed. While this design requires new piping, it requires minimal rerouting of the existing infrastructure. There is an existing storm drain line running east to west across Redlands Street between the second and third DSBBs. The inlet on the west side of Redlands Street is proposed to be treated by the third DSBB by tying in to the third DSBBs inlet pipe. The inlet from the east side of Redlands Street is proposed to remain untreated and flow into the 54-inch outlet pipe along the center of Redlands Street.

View looking north along Orange Street View looking upstream from culvert headwall

08/12/2025
C7
147 of 237

3 BV-3
Overview: BV-3 is located at the intersection of West Vista Way and South Melrose Drive within Caltrans Right-of-Way (ROW). This regional control had a PL U area of 167 acres and a trash capture rate of 141 feet per second (CFS). The proposed design for BV-3 includes two Contech 11-16-128 DSBBs with 54-inch pipes. The low flow diversion was proposed to intersect the existing 7-foot storm drain approximately 70 feet downstream from South Vista Way and discharge the treated flows approximately 90 feet downstream. The two DSBBs were arranged side by side, each with its own inlet and outlet. The low flows are to split with a flow splitting device so each DSBB receives equal flow. After out-letting from the DSBBs, the treated flows will discharge from the DSBBs into a 54-inch pipe before discharging back into the main storm drain line. The invert depth of the proposed pipes for the DSBBs were approximately 17 feet below the surface. The feasibility of the BV-3 opportunity was determined using as-built drawing D1835 and GIS elevation data.

Opportunity and Constraints:
• Gold Drive Alternative: Gold Drive is a cul-de-sac approximately 900 feet north of West Vista Way.

Placing the DSBBs at Gold Drive was determined to be infeasible due to the depth of the sewer invert compared to the main line invert. Diversions from the mainline would interfere with the existing sewer line. It was not feasible to use DSBBs at this location without relocating the existing sewer line.
• Caltrans ROW Alternative: The main constraint at this location was also the existing sewer line.

Approximately 70 feet downstream from Vista Way the storm drain line crossed under the sewer.

The proposed low flow diversion is downstream from the intersection of the sewer line and the storm drain. Having the low flow diversion downstream of the sewer line avoids any necessity to reroute the sewer line. The other item to consider is the need to coordinate with Caltrans to site this structural control with the ROW.

View looking south across West Vista Way Vi ew of potential DSBB location looking east

08/12/2025
C7
148 of 237

4 AH-2
Overview: AH-2 is located near the intersection of Faraday Way and Brookhaven Pass. This regional control had a PLU area of 124 acres and a trash captur e rate of 65 feet per second (CFS). The proposed design for AH-2 includes one Contech 11-16-128 DSBB wi th a 54-inch pipe. The low flow diversion was proposed to intersect the existing 54-inch storm dr ain at the center of Brookhaven Pass along Faraday Street and discharge the treated flows approximatel y 35 feet downstream. The invert depth of the proposed pipe for the DSBB was approximately 13 f eet below the surface. The feasibility of the AH-2 opportunity was determined using as-built drawing D3310. In addition to the proposed DSBB, there is a proposal to reroute the new storm drain along Eastbrook Road and Brookhaven Pass.

Opportunity and Constraints: There are very few constraints at the AH-2 location. There is adequate space for the DSBB at the intersection. The proposed storm drain re-route will need to buck grade on Eastbrook Road, northwest of the DSBB.

View looking west on Faraday Street View looking west across Brookheaven Pass

08/12/2025
C7
149 of 237

5 AH-9
Overview: AH-9 is located near the intersection of Business Park Drive and Poinsettia Avenue. This regional control had a PLU area of 100 acres and a tr ash capture rate of 34 feet per second (CFS). The proposed design for AH-9 includes one Contech 6-12-90 DSBB with a 36-inch pipe. The low flow diversion was proposed to divert from the existing 66-inch storm drain on west of Business Park Drive and discharge the treated flows approximately 55 feet downstream. The invert depth of the proposed pipes for the DSBB was approximately 24 feet below the surface. The feasibility of the AH-9 opportunity was determined using as-built drawing D3009 and GIS elevation data.

Opportunity and Constraints: There are very few constraints at the AH-9 location. The depth of the manhole to access the DSBB could present a problem during maintenance activities and will require additional design features (e.g., access ramp). The road is raised, and the storm drain bucks grade before the proposed DSBB location. The potential locations of the DSBB were limited by the Vista city limit to the west and an open channel to the east of Business Park Drive.

View looking North on Business Park Drive View looking South on Business Park Drive

08/12/2025
C7
150 of 237
08/12/2025
C7
151 of 237
08/12/2025
C7
152 of 237
08/12/2025
C7
153 of 237
08/12/2025
C7
154 of 237

00051960 4 Exhibit B

EXHIBIT B
CONTRACTOR’S PROPOSAL

08/12/2025
C7
155 of 237
1 City of Vista | Trash Capture BMP Device Analysis CIP 8343

REQUEST FOR PROPOSAL

TRASH CAPTURE BMP
DEVICE ANAL YSIS, CIP 8343
City of Vista
5620 Friars Road, San Diego, CA 92110
WWW.RICKENGINEERING.COM
(619) 291-0707
May 22, 2025
BV-20
BV-6
SL-1
AH-9
AH-2
AH-11
AH-12
AH-6
AH-10
BV-19
BV-18
BV-13
SSF-Basin
AH-3
HDS
Baffle Box
Structure Type
Retro/f_it
AH-8
BV-8
BV-7
BV-9
BV-16
BV-4
BV-12
BT-Basin
AH-5
BV-5
BV-11
BV-15
BV-17
BV-3
BV-2
BV-14
BV-10
District 1
District 2
District 3
District 4
Untitled
Legend
300 ft
N ➤➤N
Data SIO, NOAA, U.S. Navy, NGA, GEBCO
Data SIO, NOAA, U.S. Navy, NGA, GEBCO
Data SIO, NOAA, U.S. Navy, NGA, GEBCO
Image Landsat / Copernicus
Image Landsat / Copernicus
Image Landsat / Copernicus
Data LDEO-Columbia, NSF , NOAA
Data LDEO-Columbia, NSF , NOAA
Data LDEO-Columbia, NSF , NOAA
08/12/2025
C7
156 of 237
1 City of Vista | Trash Capture BMP Device Analysis CIP 8343 I. Cover Letter
May 22, 2025
City of Vista
Erin Adams, Administrative Programs Manager
200 Civic Center Drive
Vista, CA 92084
RE: Proposal to Provide Trash Capture BMP Device Analysis, CIP 8343 Dear Selection Committee,
Rick Engineering Company (RICK) is pleased to submit our proposal to support the City of Vista (City) with the Trash Capture BMP Device Analysis. This effort builds upon our prior work developing the City’s California Mandated Trash Cleanup Drainage Master Plan (CMTC DMP). Our team offers specialized expertise in stormwater planning, trash capture implementation, and CIP design to help advance the City’s structural trash control strategy in full alignment with SDRWQCB Order No. R9-2017-0077 and SWRCB Resolution No. 2015-0019.

With over 70 years of experience delivering high-quality civil engineering, water resources, GIS, and land surveying services throughout the region, RICK is well positioned to lead this effort. We are proud to partner with D-Max Engineering, Inc. (D-Max) for Trash Amendments compliance planning and AirX Utility Surveyors (AirX) for subsurface utility engineering services. Together, we offer the City a clear and defensible path toward achieving full trash capture system equivalency.
[ TRASH LOAD ANALYSIS AND EQUIVALENCY DEMONSTRATION . RICK developed the GIS-based tool used in the CMTC DMP to quantify trash removal. We will refine and apply this tool in collaboration with City staff and D-Max who brings deep experience supporting San Diego Region Copermittees with Trash Amendments compliance to analyze the City’s 41 full-capture and 397 partial-capture devices, quantify remaining load reduction needs, and identify viable candidate BMPs. [ PRACTICAL DESIGN EXPERTISE FROM CONCEPT TO 100% PS&E . Our team brings proven experience in siting and delivering regional and subregional BMPs within constrained ROWs and complex utility environments. We have successfully designed and delivered numerous award-winning trash capture projects in the past five years for agencies including the County of San Diego, City of Santee, and City of San Diego. Several additional BMPs are currently in concept and design phases. We will leverage this experience to develop 30%, 90%, and final 100% design plans for selected devices, including detailed layouts, hydrology, cost estimates, and bid-ready documents per City standards. [ COLLABORATION, INDUSTRY LEADERS AND AUTHORS OF REGIONAL STANDARDS. RICK and D-Max have a long-standing record of collaboration on stormwater and infrastructure projects throughout the region. Our team members have authored regional Hydrology Manuals (including sections of the new County of San Diego Hydrology Manual that is planned for adoption in 2025), Drainage Design Manuals, BMP Design Manuals, and served on numerous Technical Advisory Committees. D-Max’s planning expertise complements RICK’s engineering and implementation capabilities, ensuring practical, constructible, and locally informed solutions tailored to the City’s needs. (619) 291-0707
rickengineering.com
5620 Friars Road,
San Diego, CA 92110

SAN DIEGO ORANGE RIVERSIDE SACRAMENTO SAN LUIS OBISPO SANTA CLARITA PHOENIX TUSCON LAS VEGAS DENVER 08/12/2025
C7
157 of 237
2 City of Vista | Trash Capture BMP Device Analysis CIP 8343 Our proposal is organized in full compliance with the RFP requirements. The RICK Team, including all proposed key personnel, is fully committed to performing the required tasks for the duration of the contract. No changes to the project team will be made without City authorization. We are prepared to execute the Professional Services Master Agreement as written and can meet all City insurance requirements. The signature below is from an individual authorized to bind the firm.

As requested in RFP Section VII.B, our proposal includes the following sections:

The RICK Team stands ready with local staff, technical expertise, and commitment to support the City in the analysis, planning, and design of structural trash capture devices required to meet its trash load reduction obligations. If you have any questions, please contact me at (619) 204-5979 or [email protected].

We appreciate the opportunity to continue supporting the City and look forward to helping advance its compliance and infrastructure goals.

Sincerely,
Rick Engineering Company
Venkat Gummadi, PE, QSP/D, CPESC
Project Manager

SECTION
I. COVER LETTER
II. COMPANY INFORMATION
III. PROJECT UNDERSTANDING & APPROACH
IV. DETAILED SCOPE OF SERVICES
V. PROJECT TEAM & ORGANIZATIONAL CHART
VI. EXPERIENCE
VII. REFERENCES
VIII. STANDARD HOURL Y BILL RATES
IX. EXCEPTIONS TO RFP
X. ADDENDA TO THE RFP
APPENDIX: RESUMES
PAGE
1 3
4 7
11 16
23 24
25 25
A-1

RICK TEAM CONTACT INFORMATION
Venkat Gummadi, PE, QSD/P, CPESC
Rick Engineering Company
5620 Friars Road, San Diego, CA 92110
[email protected]
(619) 204-5979
08/12/2025
C7
158 of 237
3 City of Vista | Trash Capture BMP Device Analysis CIP 8343 II. Company Information
RICK will provide the City of Vista (City) with a highly qualified team of experts to support the analysis, planning, and design of structural trash capture devices required to meet City’s trash load reduction obligations. RICK will serve as the prime consultant on this project, supported by D-MAX Engineering, Inc. (D-MAX ) with Trash Amendments compliance planning and AirX Ut
ility Surveyors (AirX) wit h subsurface utility engineering services.

A. IDENTIFICATION OF RESPONDER
E. NUMBER OF EMPLOYEES IN SAN DIEGO
COUNTY
B. LEGAL NAME AND ADDRESS
F. NAME, TITLE, ADDRESS, TELEPHONE, & EMAIL
OF POINT-OF-CONTACTC. IDENTIFICATION OF THE PARENT COMPANY D. ADDRESSES OF OFFICES LOCATED IN SAN

DIEGO COUNTY
Rick Engineering Company (RICK)
5620 Friars Road, San Diego, CA 92110
190 employees
Not applicable Venkat Gummadi, PE, QSD/P. CPESC, Project Manager 5620 Friars Road, San Diego, CA 92110
(619) 204-5979
[email protected]
Glenn A. Rick Engineering & Development
(dba Rick Engineering Company)
5620 Friars Road, San Diego, CA 92110
FIRM OVERVIEW. RICK is a local multidisciplinary
engineering, planning, and design firm known for
providing high-quality service and value to clients for 70 years. Our company’s broad array of engineering
disciplines allows us to provide comprehensive services that can be managed in-house to assure optimum
project quality and efficiency. Our services include:
[ Water Resources
[ Geographic Information
System (GIS)
[ Survey & Mapping
[ Civil Engineering
[ Environmental Studies
SPECIALIZED EXPERTISE. The RICK Water
Resources Division will lead this project with assistance from RICK’s Civil and Surveying/Mapping Divisions. We
have 35 stormwater specialists and engineers in our
Water Resources Division, and we will be working on
this project from our local San Diego office.

RICK’s Water Resources Division is a regional leader
in Hydrology and Hydraulics (H&H), designing trash
capture devices, and water quality. Our experience
extends across all stages of a project life cycle,
including planning, design, construction, and operation and maintenance (O&M). RICK has significant
experience working with the regulations, processes, and personnel of various agencies including the Regional
Water Quality Control Board (RWQCB), Caltrans, the
Federal Emergency Management Agency (FEMA),
US Army Corps of Engineers (USACE), and California
Department of Fish and Wildlife (CDFW). As regulations
and criteria change, RICK stays on the forefront of
understanding and implementing the requirements for
hydrology and water quality.

ORGANIZATION STRUCTURE. RICK is structured
as a California corporation with its President, Chief
Operating Officer, Principals, Associate Principals, and Associates in ownership positions. The corporation
has a strong financial standing with rating agencies,
including Dun & Bradstreet.

I am grateful to Rick Engineering as part of
our team working on our most challenging
projects. We can always count on Rick
Engineering to come up with innovative and unique
solutions when required.
~ Elle Lotfi, City of San Diego
[ Traffic Engineering
[ Transportation
Engineering
[ Landscape Architecture
[ Community Planning
[ Urban Design
08/12/2025
C7
159 of 237
4 City of Vista | Trash Capture BMP Device Analysis CIP 8343 This section summarizes our project understanding, technical approach, and management approach.

PROJECT UNDERSTANDING
The City of Vista is taking a proactive approach to
comply with the State Water Resources Control Board
(SWRCB) Trash Amendments (Resolution No. 2015-
0019) and the San Diego Regional Water Quality
Control Board (SDRWQCB) MS4 Permit (Order No.

R9-2017-0077). Through its Track 2 Implementation
Plan, the City has developed a strategy that integrates both structural and non-structural Best Management
Practices (BMPs) to achieve full trash capture system
equivalency across Priority Land Use (PLU) areas.

While non-structural BMPs such as enhanced street
sweeping are projected to remove approximately 4,900
gallons of trash per year, an estimated 6,230 gallons
per year must still be addressed through structural
controls. To support this effort, RICK previously assisted the City in developing the California Mandated Trash
Cleanup Drainage Master Plan (CMTC DMP), which
identified 31 candidate locations for potential BMPs
(shown in Figure below) and included a GIS-based tool
to evaluate trash capture effectiveness.

The objective of this project is to verify the performance of existing devices, screen and prioritize candidate
BMPs, and ultimately deliver PS&E documents for 10
feasible and effective trash capture devices. This

work will support the City’s transition from planning to implementation while ensuring regulatory compliance,
cost efficiency, and long-term maintainability.

TECHNICAL APPROACH
The RICK Team brings extensive experience in
stormwater planning, urban retrofit design, and
regulatory compliance. Our approach is tailored to
align with the City’s goals and ensure defensible,
constructible outcomes while remaining adaptable to
field conditions and stakeholder feedback. Section IV
provides a detailed scope of work that builds on the
technical approach described here. Below, we highlight
key technical considerations that will be addressed
early in the project to set the stage for success:
[ Alternative Land Use Credits: Evaluate and
document credit opportunities for BMPs treating
non-PLU areas.
[ Hydrology: Select appropriate hydrologic methods
and obtain early concurrence on sizing criteria
based on watershed characteristics and rainfall
data. Different methods and approaches exist based
on what is considered acceptable.
[ Hydraulics: Assess hydraulic capacity of existing
systems and incorporate sizing considerations for
bypass design and sizing of trash capture devices
where design constraints exist.
[ Project Types/Devices: Selecting appropriate
project types/devices, retrofits vs regional vs.
subregional based site feasibility and watershed
characteristics.
[ Double Counting: Establish clear crediting
protocols to avoid overestimating benefits from
combined strategies.
[ Regulatory Defensibility: Align analysis and
design methods with SWRCB and SDRWQCB
guidance to ensure robust, traceable compliance
documentation.
[ Partial Capture Devices: Account for existing
and planned partial capture devices in overall
compliance calculations.
[ Overlapping BMPs: Ensure proper crediting in
locations where multiple BMPs overlap or provide
cumulative benefits.

III. Project Understanding & Approach
08/12/2025
C7
160 of 237
5 City of Vista | Trash Capture BMP Device Analysis CIP 8343 [ Utility Conflicts and Access: Identify utility and
access constraints early to prevent costly redesigns
or infeasible projects.
[ Maintenance Feasibility: Design with long-term
O&M in mind, using standard City equipment and
practices to ensure sustainability.
[ Workflow Integration: Incorporate maintenance
procedures and data collection into the City’s
existing Public Works workflows and asset
management systems.

With a strong track record supporting more than half
of the San Diego region’s Copermittees on Trash
Amendments compliance, D-Max brings deep regulatory
insight to inform realistic assumptions and adaptive
strategies from the outset. Together, the RICK Team is
uniquely positioned to guide the City in advancing this critical initiative. Through transparent collaboration, strategic planning, and practical design solutions,
we will deliver a clear, defensible path to achieving
full trash capture system equivalency.

MANAGEMENT APPROACH. RICK is known for delivering quality projects on time and within budget. A key to our success is the regular use of project control tools, procedures, and methods. These support planning, scheduling, scope and budget monitoring while also aiding document control, cost estimating, and adapting to project changes. To be effective, RICK project staff engage in project controls and management of best practices at the project onset as they document the project expectations and track actual performance. The RICK disciplined management approach is based on the five key components below.

THE FIVE KEY COMPONENTS OF THE RICK MANAGEMENT APPROACH 1 2 3 4 5
Communication
& Coordination
Cost
Controls
Project Planning
& Scheduling
Quality Assurance/
Quality Control
Continual
Improvement

COMMUNICATION & COORDINATION
Our approach to effective project management
is rooted in clear and effective communication.

Communication plays a key role in meeting project
objectives, reducing risk, and maintaining project
schedule and budget. We understand how important
clear and transparent project communication is to the
City. We will employ key communication strategies with
City counterparts to deliver a successful project.

PROJECT PLANNING & SCHEDULING
Detailed planning at the beginning of the project
is essential to reduce risk, ensure quality, and
maintain schedule and budget. Upon receiving the
Notice to Proceed, the RICK Team will create a detailed schedule using Microsoft Project to organize the overall project tasks and budget, while tracking actual versus
scheduled work and costs. Critical-path items, staffing resources, and cost estimates will be documented and
tracked.

COST CONTROLS
We take the financial restrictions that exist
seriously for our clients and avoid in every
possible way making any changes to the project budget.

Our clients frequently note the dedicated efforts made by RICK staff in this regard. The best way to control costs is to establish a well-defined project scope in collaboration with our clients. Determining our clients’ needs and
goals up front and organizing the project to achieve
those specific goals drastically reduces changes as the project progresses.

RICK leverages advanced project control tools such as Microsoft Project and Deltek Vision to provide the City of Vista with real-time project tracking, efficient resource allocation, and proactive risk management. These tools enhance
transparency, accountability, and decision-making.

ID Task Name
Duration Start Finish Predecessors Resource Names
1 Clairemont Mesa Blvd./SR-163 Improvements - West Ramps 1579 days Mon 7/6/09 Fri 7/24/15
2 Aerial Mapping/Surveying
54 days Mon 7/13/09 Fri 9/25/09
3 Aerial Topography (Flight)
6 days Mon 7/13/09 Mon 7/20/09
4 Electronic Topography Data Compilation
11 days Mon 8/3/09 Mon 8/17/09
5 Obtain CT Encroachment Permit for Field Surveying
44 days Thu 7/16/09 Wed 9/16/09
6 Prepare Field Survey Data
7 days Thu 9/17/09 Fri 9/25/09 5
7 Research
10 days Mon 7/6/09 Fri 7/17/09
8 Obtain City and Caltrans As-Builts
5 days Mon 7/6/09 Fri 7/10/09
9 Obtain Utility Company Schematics/.As-Builts
10 days Mon 7/6/09 Fri 7/17/09
10 Obtain Record Maps/Caltrans Right of Way Maps
5 days Mon 7/6/09 Fri 7/10/09
11 Obtain Centerline and R/W Electronic Data from Caltrans Surveys 5 days Mon 7/6/09 Fri 7/10/09
12 Kickoff PDT Meeting
1 day Thu 9/17/09 Thu 9/17/09
13 30% Design (Geometric Approval Drawings (GADs))
84 days Mon 9/28/09 Thu 1/21/10
14 Geometric Design
20 days Mon 9/28/09 Fri 10/23/09 2,6
15 Determine Existing Utility Facilities
3 days Mon 9/28/09 Wed 9/30/09 2,6
16 Identify Design Exceptions
1 day Mon 10/26/09 Mon 10/26/09 14
17 Determine Grading Impacts
2 days Mon 10/26/09 Tue 10/27/09 14
18 Determine Preliminary R/W Impacts
2 days Mon 10/26/09 Tue 10/27/09 14
19 Caltrans/City Reviews GADs
30 days Wed 10/28/09 Tue 12/8/09 16,17,18
20 Compile/Address GADs Comments
5 days Tue 1/5/10 Mon 1/11/10 19
21 Caltrans/City Approve GADs
8 days Tue 1/12/10 Thu 1/21/10 20
22 65% Design Milestone
90 days Wed 1/20/10 Tue 5/25/10
23 Prepare Roadway & Drainage Plans
45 days Fri 1/22/10 Thu 3/25/10 21
24 Prepare Drainage Report
22 days Fri 1/22/10 Mon 2/22/10
25 Prepare Design Exception Fact Sheets
22 days Mon 2/15/10 Tue 3/16/10
26 Prepare Geotechnical Design Report (GDR) (Ninyo & Moore) 83 days Wed 1/20/10 Fri 5/14/10
27 Obtain Encroachment Permit
55 days Wed 1/20/10 Tue 4/6/10
28 Prepare GDR
28 days Wed 4/7/10 Fri 5/14/10 27
29 Prepare Quantities
7 days Fri 3/26/10 Mon 4/5/10 23
30 Prepare Landscape Concept Exhibit
10 days Mon 3/22/10 Fri 4/2/10
31 Prepare Right of Way Requirements Map
5 days Fri 3/26/10 Thu 4/1/10 23
32 Prepare Modified Access Report & Resolution of Change 5 days Fri 3/26/10 Thu 4/1/10
33 Caltrans/City Reviews 65% Submittal Package
30 days Wed 4/7/10 Tue 5/18/10 24,25,23,31,32
34 Compile/Address 65% Submittal Comments
5 days Wed 5/19/10 Tue 5/25/10 33
35 90% Design Milestone
249 days Mon 4/19/10 Thu 3/31/11
36 Prepare/Revise Roadway & Drainage Plans
30 days Wed 5/26/10 Tue 7/6/10 34
37 Prepare Stage Construction Concepts
20 days Mon 4/19/10 Fri 5/14/10
38 Prepare Traffic Plans
65 days Wed 7/7/10 Tue 10/5/10 36
39 Prepare Landscape & Irrigation Plans
30 days Wed 7/7/10 Tue 8/17/10 36
40 Utility Conflict List & Coordination
10 days Wed 5/26/10 Tue 6/8/10 34
41 Update Transportation Management Plan (TMP)
14 days Wed 5/26/10 Mon 6/14/10 34
42 Prepare SWPPP
30 days Wed 7/7/10 Tue 8/17/10 36
43 Update Storm Water Data Report (SWDR)
20 days Wed 7/7/10 Tue 8/3/10 36
44 Update Drainage Report
50 days Wed 7/7/10 Tue 9/14/10 36
45 Finalize Geotechnical Design Report (GDR) (Ninyo & Moore) 25 days Wed 5/26/10 Tue 6/29/10 34
46 Prepare Draft Special Provisions List of Items
2 days Wed 10/6/10 Thu 10/7/10 36,38,39
47 Update Quantities
2 days Wed 10/6/10 Thu 10/7/10 36,38,39
48 Caltrans Approval: Design Exception Fact Sheets
1 day Fri 2/18/11 Fri 2/18/11 36,38,39,46,47
49 Caltrans/City Reviews 90% Submittal Package
30 days Fri 2/18/11 Thu 3/31/11 36,38,39,37,46,47
50 City: Provide Notice to Proceed to Rick Engineering Company for Phase 2 1 day Fri 4/1/11 Fri 4/1/11 49
51 100% Design Milestone (Log-in Submittal)
75 days Mon 4/4/11 Fri 7/15/11
52 Address Plans, Specifications, and Estimates Comments 45 days Mon 4/4/11 Fri 6/3/11 50
53 Finalize Reports (e.g. SWPPP, TMP, SWDR)
45 days Mon 4/4/11 Fri 6/3/11 50
54 Prepare Slope Stake Notes and Cross Sections
45 days Mon 4/4/11 Fri 6/3/11 50
55 Caltrans/City Review and Approval
30 days Mon 6/6/11 Fri 7/15/11 52,54
56 Final PS&E
60 days Mon 7/18/11 Fri 10/7/11
57 Submit Final PS&E Package to Caltrans/City
20 days Mon 7/18/11 Fri 8/12/11 55
58 Final District Circulation Submittal
30 days Mon 8/15/11 Fri 9/23/11 57
59 Final Office of the Engineer Submittal
30 days Mon 8/15/11 Fri 9/23/11 57
60 Caltrans approves Encroachment Permit
2 wks Mon 9/26/11 Fri 10/7/11 59,58
61 Advertise & Award (Funding Becomes Available)
3 mons Mon 7/1/13 Fri 9/20/13
62 Construction
18 mons Mon 9/23/13 Fri 2/6/15 61
63 Project Closeout/As-Builts
6 mons Mon 2/9/15 Fri 7/24/15 62
9/17
Jun Jul u e Oct o e Jan e MarApr a Jun Jul u e Oct o e Jan e MarApr a Jun Jul u e Oct o e Jan e MarApr a Jun Jul Au e Oct o e Jan e MarApr a Jun Jul u e Oct o e Jan e MarApr a Jun Jul u e Oct o e Jan e MarApr a Jun Jul u 2nd Half 1st Half 2nd Half 1st Half 2nd Half 1st Half 2nd Half 1st Half 2nd Half 1st Half 2nd Half 1st Half 2nd H Task
Split
Progress
Milestone
Summary
Project Summary
External Tasks
External Milestone
Deadline
Clairemont Mesa Blvd./State Route 163 Improvements - West Ramps J-15822
Rick Engineering Company
Prepared by: E. Camerino

Page 1 of 1 ends

T:\15822\_docs\Schedule\Project Schedule_020811.mpp
Date: February 10, 2011
08/12/2025
C7
161 of 237
6 City of Vista | Trash Capture BMP Device Analysis CIP 8343 RICK controls costs through an effective combination
of tracking and management activities, including:
[ Weekly expenditure tracking, report
compilation, and report review by the Project
Manager using Deltek Vision
[ Effective staff supervision
[ Continuity of staff assignments
[ Continuous project communication
[ Timely resolution of project issues
[ Monthly detailed reports (expenditures vs.
budget; completion progress vs. plan, etc.)

QUALITY ASSURANCE/

QUALITY CONTROL
Delivering quality products is a foundational
component of RICK’s business practice. The RICK
Quality Assurance and Quality Control Program is
comprehensive and based on proven techniques and
years of experience. With more than seven decades of
experience, RICK has earned a reputation for producing
high-quality work, as evidenced by its many long-term
clients. No matter the project size, we are committed to understanding our clients’ needs, meeting the quality
requirements and standards specified, and surpassing
our clients’ expectations.

As a matter of practice, RICK promotes continual
emphasis and commitment to quality control through
all project phases. Our efforts are facilitated by utilizing the Company’s Manual on Quality Control Standards,
periodic quality control seminars, peer reviews, and
staff performance reviews throughout the year. We
apply these measures to all levels of work, including
project scheduling, internal reviews, record-keeping
documentation, and plan preparation. A quality control
plan is prepared for each project, and the assigned
Project Manager maintains the requisite checklists.

Quality control reviews are coordinated by our QA/
QC Manager (Brendan Hastie and John Quenzer)
and conducted by an independent Project Manager
throughout the development of a project.

CONTINUAL IMPROVEMENT
Our team continually improves when we identify
best practices and the project team documents
lessons learned throughout the project life-cycle. We
share this project data across RICK’s multiple disciplines and integrate it into the company’s institutional
knowledge base. The experience gained from one
project can benefit future projects and improve company capabilities and the service we provide to the City.

RICK’s management approach to projects is not one
size fits all. We understand the need to constantly
adapt to fit the needs outlined by the City’s Project
Manager. We know that a successful project starts with
a clear understanding and development of the scope
and fee from concept to completion of construction.

This approach helps ensure that assumptions are in
alignment for the success of the project.

RICK's Quality Manual
08/12/2025
C7
162 of 237
7 City of Vista | Trash Capture BMP Device Analysis CIP 8343 IV. Detailed Scope of Services
To meet the City’s objectives for this Trash Capture BMP Device Analysis project, the RICK Team (consultant) will provide the following services. To successfully complete the project, we added the Project Management and Meetings task as Task 1.

TASK 1: PROJECT MANAGEMENT AND

MEETINGS
The consultant will provide project management
services including:

A. PROGRESS REVIEW MEETINGS: The consultant will
participate in up to six (6) meetings. Meetings will focus on data delivery and City review to maintain schedule
adherence and ensure regular feedback. The Consultant
will prepare agendas prior to each meeting and submit
meeting minutes to the City within five (5) business days for review and concurrence. Meeting topics will include:
i. Kickoff Meeting: Discuss project goals, review
available City data, and establish communication
protocols with key City staff and consultants.
ii. Trash Loading Workshop: Review updated trash
loading calculations and select 15 candidate
BMPs for further analysis.
iii. 30% Design Meeting: Present 30% plans,
updated trash calculations, and confirm the
projects advancing to 90% and 100% PS&E
development.
iv. 90% PS&E Review: Discuss 90% plans,
specifications, estimates, and proposed revisions
for 100% submittals.
v. Final Design Review: Review 100% PS&E
submittals and trash loading calculations.
vi. One Additional Meeting: Reserved for project
development needs.

B. PROJECT MANAGEMENT: The consultant will
provide monthly progress reports and invoices for the
project duration. Monthly progress reports will include the reporting period, work completed in reporting
period, work anticipated in upcoming reporting period,
identification of critical path items/decisions, and a
budget and schedule update. A monthly progress report
template will be shared with the City at the start of the project to get concurrence on format. In addition, the
Consultant will maintain open communication for the
duration of the project. Weekly internal team meetings will ensure that project tasks are proceeding as scheduled
to meet the City’s needs. Questions requiring City input will be coordinated immediately to maintain the project schedule.

Deliverables:
[ Meeting agendas and minutes (up to 6 meetings).
[ Monthly progress memoranda (up to 15 months).

TASK 2: TRASH LOADING CALCULATIONS
The consultant will provide the following services under this task:

A. INVENTORY OF EXISTING TRASH CAPTURE
BMPS: Review the inventory of 41 full-capture and 397
partial-capture trash BMPs. Where feasible, drainage
areas will be refined to quantify trash load reductions not yet credited in the CMTC DMP.

B. 10% CONCEPTS OF 31 TRASH CAPTURE
CANDIDATE BMPS: Perform a desktop review of
31 candidate sites. Provide a qualitative narrative of
advantages/disadvantages and annotated imagery for
use during the candidate selection workshop.

C. REFINEMENTS TO TRASH LOADING
CALCULATIONS: Coordinate with City staff to refine
trash loading estimates from existing BMPs and
determine the remaining required load reduction.

Revisions will primarily focus on accounting for alternative land uses and overlapping BMP scenarios.

D. DRAFT TECHNICAL MEMO: The analysis from this
task will be summarized in a draft technical memo that
will be circulated prior to the workshop.

E. FINAL TECHNICAL MEMO: Updates to the draft
technical memo based on feedback received from
the workshop and one round of written consolidated
comments from the City.

Deliverables:
[ Refined GIS inventory of existing trash capture
BMPs
[ 10% Concepts for 31 Trash Capture Candidate
BMPs
[ Draft Technical Memo
[ Final Technical Memo (updates based on one
round of written comments from City staff)
08/12/2025
C7
163 of 237
8 City of Vista | Trash Capture BMP Device Analysis CIP 8343 TASK 3: 30% CONCEPTS FOR 15

CANDIDATE BMPS
The consultant will provide the following services under this task:

A. COMPILE BASELINE DATA: Review City-provided
data and compile digital basemap information, including right-of-way, property lines, LiDAR topography, and
existing utilities. Up to two (2) days of field survey are assumed to collect flowline data.

B. 30% PLANS AND PRELIMINARY COST
ESTIMATES: Prepare 30% design plans and preliminary
cost estimates for 15 candidate BMPs. These may
include retrofits, subregional, or regional projects. Some plans may be developed using vendor shop drawings,
depending on project type.

C. REFINEMENTS TO TRASH LOADING
CALCULATIONS: The consultant will calculate the
volume of trash removed at each of the 15 locations
and provide a recommendation for the projects needed
to meet the load reduction requirements.

Deliverables:
[ 30% Plans and Preliminary Cost Estimates for 15
Candidate BMPs
[ Updated Trash Loading Calculations and
recommendations for projects needed to meet the
load reduction requirements (PowerPoint format).

TASK 4: 90% PS&E FOR UP TO 10 BMPS
For scoping purposes, it is assumed selected BMPs
will include a mix of retrofit, subregional, and regional projects, without system upgrades (e.g., storm drain
upsizing or ADA improvements). The consultant will
provide the following services under this task:

A. 90% PLANS: Develop 90% design plans for up to 10
BMPs. Final selection will be confirmed following Task

3. Up to 10 utility potholes and 8 days of field survey are assumed.

B. HYDROLOGIC AND HYDRAULIC (H&H) ANALYSIS:

The consultant will prepare H&H analysis required for
sizing the trash capture devices. This analysis will be documented in a draft design memo.

C. SPECIFICATIONS AND COST ESTIMATES: Develop
draft specifications and cost estimates for each project.

D. REFINEMENTS TO TRASH LOADING
CALCULATIONS: The consultant will calculate the
volume of trash removed at each of the project location using the information from the designs from the 90%
plans and will document the findings in a draft design
memo.

Deliverables:
[ 90% Plans, Specifications, and Cost Estimates
[ Draft Design Memo (includes H&H analysis and
trash loading calculations).

TASK 5: 100% PS&E FOR UP TO 10
BMPS
The consultant will provide the following services under this task:

A. 100% PLANS: Update 90% plans to final 100%
design incorporating one round of City comments. Plans
will conform to City standards.

B. HYDROLOGIC AND HYDRAULIC (H&H) ANALYSIS:

Revise H&H analysis based on design updates.

Document in the final design memo.

C. SPECIFICATIONS AND COST ESTIMATES: Prepare
final specifications and cost estimates based on
feedback.

D. REFINEMENTS TO TRASH LOADING
CALCULATIONS: Update trash removal volumes based
on 100% designs and document in the final memo.

Deliverables:
[ 100% Plans, Specifications, and Cost Estimates.
[ Final Design Memo (includes final H&H analysis
and trash loading calculations).

TASK 6: AS-NEEDED SERVICES
The consultant will provide as-needed services that
are deemed necessary and not planned as part of the
base scope after receiving written (email) authorization from the City Project Manager. For fee estimation
purposes 120 hours of professional services is
assumed under this task. The task is also meant to
cover any specialized subconsultants (Structural and
Geotechnical) based on projects selected for final
design.
08/12/2025
C7
164 of 237
* Not counted towards page count.
9 PROJECT SCHEDULE. The proposed schedule assumes City Council approval in September 2025 and issuance of a Notice to Proceed, with the project commencing on October 1, 2025, and concluding in December 2026.

The detailed project schedule is provided below, with all consultant work tasks highlighted in blue and City staff responsibilities highlighted in green. The project is proposed to be completed within 15 months. 1-Oct
15-Oct
29-Oct
12-Nov
26-Nov
10-Dec
24-Dec
7-Jan
21-Jan
4-Feb
18-Feb
4-Mar
18-Mar
1-Apr
15-Apr
29-Apr
13-May
27-May
10-Jun
24-Jun
8-Jul
22-Jul
5-Aug
19-Aug
2-Sep
16-Sep
30-Sep
14-Oct
28-Oct
11-Nov
25-Nov
9-Dec
23-Dec
a. Progress Review Meetings (6 meetings) ШШ ШШШ Ш
b. Project Management (15 months)
City Staff to provide available data
a. Inventory of Existing Trash Capture BMPs
b. 10% Concepts of 31 Trash Capture Candidate BMPs
c. Refinements to Trash Loading Calculations
d. Draft Technical Memo
City Staff review of Draft Technical Memo
e. Final Technical Memo
City Staff to provide available data
a. Compile Baseline Data
b. 30% Plans and Preliminary Cost Estimates
c. Refinements to Trash Loading Calculations
City Staff review of 30% Concepts
a. 90% Plans
b. Hydrologic and Hydraulic Analysis
c. Specifications and Cost Estimates
d. Refinements to Trash Loading Calculations
City Staff review of 90% PS&E
a. 100% Plans
b. Hydrologic and Hydraulic Analysis
c. Specifications and Cost Estimates
d. Refinements to Trash Loading Calculations
a. As-Needed Services
Task 4: 90% PS&E for up to 10 BMPs
Task 1: Project Management and Meetings
Task 2: Trash Loading Calculations
Task 3: 30% Concepts for 15 Candidate BMPs
Task 5: 100% PS&E for up to 10 BMPs
Task 6: As-Needed Services
LEGEND

CONSULTANT TASK CITY RESPONSIBLE TASK
08/12/2025
C7
165 of 237
* Not counted towards page count.
10 DETAILED HOURS BREAKDOWN. The table below provides the detailed breakdown of the number of hours anticipated for each staff classification (including both professional and administrative classification) for each task identified in the detailed scope of services presented in Section IV.

Labor
Classification
Principal
Associate Principal
Principal Project
Manager
Associate Project
Manager
Assistant Project
Manager
Senior Technical
Manager
Principal Designer
Associate
Designer(s)
Assistant Designer
GIS Asset Manager
GIS Project Manager/
Programmer
Project Administrator
Two-Person Survey
Party
a. Progress Review Meetings (6 meetings) 10 30 60 100 24 b. Project Management (15 months) 30 30 60 120 16
Task 1 Sub-Total 40 60 60 60 220 40
a. Inventory of Existing Trash Capture BMPs 4 40 10 16 20 90 24 b. 10% Concepts of 31 Trash Capture Candidate BMPs 4 4 40 48 c. Refinements to Trash Loading Calculations 2 16 80 12 110 60 d. Draft Technical Memo 1 8 20 29 28
e. Final Technical Memo 1 4 8 13 16
Task 2 Sub-Total 4 4 36 40 148 10 28 20 290 128
a. Compile Baseline Data 2 4 40 40 40 8 16 150
b. 30% Plans and Preliminary Cost Estimates 18 30 50 80 80 260 160 20 12 710 140 c. Refinements to Trash Loading Calculations 2 10 40 8 60 30 Task 3 Sub-Total 20 32 64 120 120 340 160 28 20 16 920 170 a. 90% Plans 4 16 24 160 160 330 64 758 30
b. Hydrologic and Hydraulic Analysis 2 12 4 8 160 186
c. Specifications and Cost Estimates 4 80 84
d. Refinements to Trash Loading Calculations 2 4 32 4 42 20 Task 4 Sub-Total 8 20 40 4 8 160 240 192 330 4 64 1070 50 a. 100% Plans 2 2 6 40 100 200 8 358
b. Hydrologic and Hydraulic Analysis 1 8 4 4 80 97
c. Specifications and Cost Estimates 2 20 22
d. Refinements to Trash Loading Calculations 1 2 20 23 12 Task 5 Sub-Total 4 4 16 4 4 40 120 100 200 8 500 12
a. As-Needed Services 4 24 80 12 120
Task 6 Sub-Total 4 24 80 12 120
Total Project Hours 80 60 240 8 12 360 480 920 700 80 40 60 80 3120 400 RICK
RICK Total Hours
Task 5: 100% PS&E for up to 10 BMPs
Task 6: As-Needed Services
D-Max Hours
Task 2: Trash Loading Calculations
Task 3: 30% Concepts for 15 Candidate BMPs
Task 4: 90% PS&E for up to 10 BMPs
Task 1: Project Management and Meetings
08/12/2025
C7
166 of 237
1 | Page

IV. Detailed Scope of Services
To meet the City’s objectives for this Trash Capture BMP Device Analysis project, the RICK Team (consultant) will provide the following services. To successfully complete the project, we added the Project Management and Meetings task as Task 1.

TASK 1: PROJECT MANAGEMENT AND MEETINGS
The consultant will provide project management services including:

A. PROGRESS REVIEW MEETINGS : The consultant will participate in up to six (6) meetings.

Meetings will focus on data delivery and City review to maintain schedule adherence and ensure regular feedback. The Consultant will prepare agendas prior to each meeting and submit meeting minutes to the City within five (5) business days for review and concurrence.

Meeting topics will include:
i. Kickoff Meeting: Discuss project goals, review available City data, and establish communication protocols with key City staff and consultants. ii. Trash Loading Quantification Approach Workshop: Review assumptions and approach for quantifying trash load reductions from existing full capture and partial capture BMPs.
iii. Trash Loading Workshop: Review updated trash loading calculations and strategize on number of structural BMPs required to achieve full trash capture system equivalency.
iv. 30% Design Meeting: Present 30% plans, updated trash calculations, and confirm the projects advancing to 90% and 100% PS&E development.
v. 90% PS&E Review: Discuss 90% plans, specifications, estimates, and proposed revisions for 100% submittals.
vi. Final Design Review: Review 100% PS&E submittals and trash loading calculations.

B. PROJECT MANAGEMENT : The consultant will provide monthly progress reports and invoices for the project duration. Monthly progress reports will include the reporting period, work completed in reporting period, work anticipated in upcoming reporting period, identification of critical path items/decisions, and a budget and schedule update. A monthly progress report template will be shared with the City at the start of the project to get concurrence on format. In addition, the Consultant will maintain open co mmunication for the duration of the project. Weekly internal team meetings will ensure that project tasks are proceeding as scheduled to meet the City’s needs. Questions requiring City input will be coordinated immediately to maintain the project schedule. 08/12/2025
C7
167 of 237
2 | Page

Deliverables:
• Meeting agendas and minutes (up to 6 meetings).
• Monthly progress memoranda (up to 15 months).

TASK 2: TRASH LOADING CALCULATIONS
The consultant will provide the following services under this task:

A. INVENTORY OF EXISTING TRASH CAPTURE BMPS: Review the inventory of 1,110 BMPs which includes a combination of full- capture and partial-capture trash BMPs. Where feasible, drainage areas will be refined to quantify trash load reductions not yet credited in the CMTC DMP .

B. REFINEMENTS TO TRASH LOADING CALCULATIONS: Coordinate with City staff to refine trash loading estimates from existing BMPs and determine the remaining required load reduction. Revisions will primarily focus on accounting for alternative land uses and overlapping BMP scenarios.

C. DRAFT TECHNICAL MEMO : The analysis from this task will be summarized in a draft technical memo that will be circulated prior to the workshop.

D. FINAL TECHNICAL MEMO : Updates to the draft technical memo based on feedback received from the workshop and one round of written consolidated comments from the City.

Deliverables:
• Refined GIS inventory of existing trash capture BMPs
• Draft Technical Memo
• Final Technical Memo (updates based on one round of written comments from City staff)
The findings from T ask 2 will dictate the number of structur al BMPs needed for the City to achieve full trash capture system equivalency. The following tasks and fee estimates are included for planning purposes. At conclusion of Task 2, the scope and fee of the remaining tasks may be modified at the discretion of the City Project Manager, with mutual agreement by the Consultant Project Manager.

TASK 3: 30% CONCEPTS
The consultant will provide the following services under this task:
08/12/2025
C7
168 of 237
3 | Page

A. COMPILE BASELINE DATA : Review City-provided data and compile digital basemap information, including right-of-way, property lines, LiDAR topography, and existing utilities.

Up to two (2) days of field survey are assumed to collect flowline data.

B. 30% PLANS AND PRELIMINARY COST ESTIMATES : Prepare 30% design plans and preliminary cost estimates for 15 candidate BMPs. These may include retrofits, subregional, or regional projects. Some plans may be developed using vendor shop drawings, depending on project type.

C. REFINEMENTS TO TRASH LOADING CALCULATIONS: The consultant will calculate the volume of trash removed at each of the 15 locations and provide a recommendation for the projects needed to meet the load reduction requirements.

Deliverables:
• 30% Plans and Preliminary Cost Estimates for 15 Candidate BMPs • Updated Trash Loading Calculations and recommendations for projects needed to meet the load reduction requirements (PowerPoint format).

TASK 4: 90% PS&E
For scoping purposes, it is assumed selected BMPs will include a mix of retrofit, subregional, and regional projects, without system upgrades (e.g., storm drain upsizing or ADA improvements). The consultant will provide the following services under this task:

A. 90% PLANS : Develop 90% design plans for up to 10 BMPs. Final selection will be confirmed following Task 3. Up to 8 days of field survey are assumed.

B. HYDROLOGIC AND HYDRAULIC (H&H) ANALYSIS : The consultant will prepare H&H analysis required for sizing the trash capture devices. This analysis will be documented in a draft design memo.

C. SPECIFICATIONS AND COST ESTIMATES: Develop draft specifications and cost estimates for each project.

D. REFINEMENTS TO TRASH LOADING CALCULATIONS: The consultant will calculate the volume of trash removed at each of the project location using the information from the designs from the 90% plans and will document the findings in a draft design memo.

Deliverables:
• 90% Plans, Specifications, and Cost Estimates
• Draft Design Memo (includes H&H analysis and trash loading calculations). 08/12/2025
C7
169 of 237
4 | Page

TASK 5: 100% PS&E
The consultant will provide the following services under this task:

A. 100% PLANS : Update 90% plans to final 100% design incorporating one round of City comments. Plans will conform to City standards.

B. HYDROLOGIC AND HYDRAULIC (H&H) ANALYSIS: Revise H&H analysis based on design updates. Document in the final design memo.

C. SPECIFICATIONS AND COST ESTIMATES: Prepare final specifications and cost estimates based on feedback.

D. REFINEMENTS TO TRASH LOADING CALCULATIONS: Update trash removal volumes based on 100% designs and document in the final memo.

Deliverables:
• 100% Plans, Specifications, and Cost Estimates.
• Final Design Memo (includes final H&H analysis and trash loading calculations).

TASK 6: AS-NEEDED SERVICES
The consultant will provide as-needed services that are deemed necessary and not planned as part of the base scope after receiving written (email) authorization from the City Project Manager. For fee estimation purposes, 120 hours of professional services assumed under this task. The task is also meant to cover any specialized subconsultants (Structural and Geotechnical) based on projects selected for final design. 08/12/2025
C7
170 of 237
11 City of Vista | Trash Capture BMP Device Analysis CIP 8343 V. Project Team & Organizational
Chart
THE RICK TEAM. The strongest asset of our RICK
Team is the personnel we have assigned to the Trash
Capture BMP Device Analysis project. We proudly offer
the City a team of industry-leading experts, all of whom have many years of relevant experience and have worked
together as a cohesive team on a number of projects in
the San Diego region.

For the Trash Capture BMP Device Analysis project,
Principal-in-Charge and Project Manager Venkat
Gummadi, PE, CPESC, QSD/P, will be responsible for
managing the project’s day-to-day activities and serving as the City’s main point-of-contact. He is well-versed in leading multi-disciplinary teams on complex projects.

As the Principal of RICK, he will provide corporate
resources, and commitment. John Quenzer, CPSWQ,
QSD/P from D-Max will serve as a strategic advisor for
Trash Amendment compliance planning and will support
with conducting quality control reviews throughout
the project and prior to deliverable finalization. Trash Order Compliance tasks will be led by Andrew Thies,
CFM, water resources and hydrology and hydraulic
(H&H) studies will be led by Mariah Rodriguez, PS&E
development will be led by Nick Dorner, PE, and GIS
Asset Management related tasks will be led by Mikala
Randich.

MARIAH

RODRIGUEZ

ANDREW THIES
CFM

VENKAT GUMMADI

PE, QSD/P, CPESC

NICK DORNER
PE

JOHN QUENZER

MS, CPSWQ, QSD/PMIKALA RANDICH

WATER RESOURCES/H&H LEAD
[ Led hydraulic modeling for more than
10 trash capture devices in last 5
years
[ Supporting the County develop a
standardized methodology to analyze
trash capture devices
[ Supports stormwater plan reviews for
County and Port infrastructure

TRASH COMPLIANCE LEAD
[ Certified Floodplain Manager
[ Specializes in Drainage Master Plans
and developing GIS-based tools for
trash compliance planning
[ Exclusively serving public clients

PRINCIPAL-IN-CHARGE &

PROJECT MANAGER
[ 17 Years of Specialized Local
Drainage and Water Quality
experience
[ Led development of more than 20
trash capture devices in last 5 years
[ Author of Regional Hydrology,
Drainage & BMP Design Manuals

CIVIL LEAD
[ Specializes in PS&E development in
constrained ROWs and complex utility
environments
[ Engineer of Work on numerous
award-winning projects including a
trash capture project
[ Project Engineer on major
infrastructure projects in San Diego

QA/QC & STRATEGIC ADVISOR
[ 22 years in municipal stormwater
planning and compliance
[ Supported more than half of San
Diego Copermittees with trash
compliance planning efforts
[ Expert in developing equivalent
alternative land use methodologies

GIS LEAD
[ Specializes in GIS and asset
management for public agencies
[ MS4 GIS inventory updates for the
County of San Diego
[ Street sweeping route optimization
tool development for City of San
Diego

OUR KEY PERSONNEL
08/12/2025
C7
171 of 237
12 City of Vista | Trash Capture BMP Device Analysis CIP 8343 ORGANIZATIONAL CHART. A well-organized team, with a clear division of responsibilities, is essential to successful delivery of a project with the complexity of the City’s Trash Capture BMP Device Analysis. Our project team is structured to provide all services specified in the RFP and to be responsive to project goals and City’s needs.

We selected local subject-matter experts who have many years of relevant experience and have worked together as a cohesive team on several projects in Vista and its surrounding watersheds. Our organization chart identifies our key personnel, the requisite disciplines and support staff, as well as the reporting/communication structure within the team. All proposed staff shown are fully committed to the needs of this project, from start to finish.

LINES OF COMMUNICATION. Timely, clear, and concise communication is a key component of RICK’s proven project management approach. We will communicate frequently and candidly within our team (including subconsultants) and with the City on technical, contractual, and administrative matters.

As the main point-of-contact, Venkat will keep in regular communication with the City, including email, telephone, and face-to-face meetings as appropriate based on circumstances. We understand the value of people’s time and the value of clear communication. When a brief email will suffice, that will be the communication method used. If a more complex issue arises that requires a face-to-face meeting, Venkat will schedule a meeting with the City and appropriate project team members.

PRINCIPAL-IN-CHARGE/PROJECT MANAGER:

Venkat Gummadi, PE, QSD/P , CPESC *

WATER RESOURCES / H&H CIVIL

SURVEYING & POTHOLING

TRASH ORDER COMPLIANCE
GIS
Mariah Rodriguez *
Laura Henry, PE
Christopher Mattox, PE
Eric Hengesbaugh, PE
Nick Dorner, PE *
Carson Edgington, PE
Olivia Lincoln, PE
Shavger Rekani, PE, CFM
Geff Dye, PLS
(AirX)
Gabriel Mercado
Andrew Thies, CFM *

(D-Max)
John Quenzer, MS, CPSWQ, QSD/P *
Teresa Lyndon, MS, CPSWQ, QISP , QSD
Alexandra Cortes, MS, EIT
Mikala Randich
Mario Terrazas
Ben Alonzo, GISP
QA/QC & STRATEGIC ADVISOR(S):

Brendan Hastie, PE, LEED AP
John Quenzer, MS, CPSWQ, QSD/P *
* KEY PERSONNEL
All team members are RICK staff unless otherwise noted.

Resumes for all staff identified above are included in the Appendix. 08/12/2025
C7
172 of 237
13 City of Vista | Trash Capture BMP Device Analysis CIP 8343 SUBCONSULTANTS. Our teaming decisions are driven
by our client’s needs and the projects’ features. We seek strategic teaming partnerships that align with the specific needs of our clients and the unique requirements of each project. We prioritize strategic partnerships that provide the optimal combination of technical expertise, local
knowledge, and qualified personnel. For this project,
we have partnered with D-Max for Trash Amendments
compliance planning and AirX for subsurface utility
engineering services. Both firms bring extensive local
experience, in-depth understanding of City projects, and a strong track record of successful collaboration with
RICK.

D-MAX is a local
environmental consulting
firm that specializes
in National Pollutant
Discharge Elimination System (NPDES) permit program
services for municipalities. Since 1996, D-Max has
worked with 20 municipalities in San Diego, Orange,
Imperial, and Riverside Counties on various stormwater
projects. D-Max staffs a team of 12 stormwater
professionals including civil engineers, environmental
scientists, environmental chemists, and biologists
who are experienced with municipal NPDES permit
requirements in Southern California, specifically the
Regional Water Quality Control Board (Regional Board)
Order No. R9-2013-0001, as amended by Order
No. R9-2015-0001 and Order No. R9-2015-0100
(Municipal Permit) and the Trash Amendments. D-Max
is a State-certified small business enterprise (SBE) and is organized as a California corporation. D-Max staff
are dedicated to the success of City projects and will
schedule work items to successfully complete the City’s scope of work.

AIRX has been providing quality
subsurface utility engineering
services in Southern California
since 2003 and is considered
one of San Diego’s subsurface
utility engineering technology leaders. Our services
ensure work and cost efficiency and most importantly,
safety. AirX offers a comprehensive package that
includes vacuum excavation; utility locating services
including contract locating in support of USA One Call
Center; ground penetrating radar (GPR); video inspection (CCTV) of ducts, sewer, and storm drains; traffic control plans; permit processing; traffic control equipment &
set-up; documentation and road surface repairs. It is our goal to provide our clients with superior services that can be tailored to meet their needs. AirX has worked
within the City of Vista throughout its history, and has recently held the on-call potholing contract with Vista Irrigation District. AirX was also involved in the City of Vista’s Nevada and Lemon Sidewalks and Lighting
project, drafting traffic control plans and providing
traffic control equipment setup so geotechnical borings could be performed. Job site and public safety are our
top priority. Our standard, ongoing training programs
consist of MTS/NCTD Guide and Regulations for
Non-Railroad Contractors, 40 Hour HAZWOPER, 10
Hour OSHA Contractor’s Safety, NUCA Confined Space
Entry and Competent Person, Traffic Control Technician/ Flagger, Emergency First Aid/CPR and Defensive Driver.

Additional training is also provided for use of specific equipment and practices pertinent to the trade and
services we provide. AirX is a California state-certified “Small Business Enterprise”, CPUC-certified “Women’s
Business Enterprise”, federal SBA certified WOBC,
and with the National Women’s Business Enterprise
Certification (WBENC).

KEY PERSONNEL QUALIFICATIONS SUMMARY.

As the prime consultant, RICK understands the
importance of focused attention, responsiveness, and
adherence to time and budget constraints. Our team is
fully committed to dedicating the time, expertise, and
resources needed to deliver a high-quality project that aligns with the City’s goals. Summaries of key team
members with relevant local experience are provided
below, with full resumes included in the Appendix.

PRINCIPAL-IN-CHARGE AND
PROJECT MANAGER | VENKAT
GUMMADI, PE, CPESC, QSD/P will
lead the project, overseeing all aspects
including staffing, schedule and cost
management, and deliverable quality.

Venkat is a Principal at RICK, where
he manages a design team for preparing hydrologic,
hydraulic, and water quality treatment analyses and
design. He is well-versed in leading multidisciplinary
teams and delivering successful outcomes. Venkat
served as the project manager for the CMTC DMP and
similar trash planning studies for County of San Diego
and City of San Diego. Venkat led PS&E development for
multiple trash capture projects including South Mission Road and Smugglers Gulch for County of San Diego,
Newman Environmental Wetland System (NEWS) for
City of Newman, outfall retrofits at Los Peñasquitos
creek for City of San Diego. In addition, Venkat also led multiple preliminary engineering reports exploring various trash capture design alternatives for multiple municipal agencies in San Diego County. Venkat was the lead
author on multiple regional guidance documents,
including Model BMP Design Manual, Watershed
08/12/2025
C7
173 of 237
14 City of Vista | Trash Capture BMP Device Analysis CIP 8343 Management Area Analysis, phase two of the Water
Quality Equivalency Guidance Document, and is currently supporting the County Flood Control Section with
updates to the 2003 County Hydrology Manual.

STRATEGIC ADVISOR AND QA/QC
| JOHN QUENZER, CPSWQ, QSD/P
will serve as a strategic advisor for
Trash Amendment compliance planning
and will support with conducting quality
control reviews throughout the project
and prior to deliverable finalization. John
has been involved in Trash Amendments compliance
planning since the State Water Board adopted them in
2015. He has developed comparisons for the Track 1
and Track 2 compliance approaches and presented the
results to management for several jurisdictions. John has worked with over half the San Diego region Copermittees on Trash Amendments compliance planning and
will provide insight on different implementation and
compliance approaches. For Track 2 agencies like
the City, that includes how to take credit for different structural and non-structural strategies, avoiding double counting strategies for BMPs in the same vicinity,
how to complete the Full Capture System Equivalency
calculations, and integrating maintenance procedures
and data collection into the Public Works’ existing
workflows and data management systems.

TRASH ORDER COMPLIANCE|
ANDREW THIES, CFM will lead trash
order compliance related tasks. He
specializes in using GIS to develop
asset inventories, assess conditions,
model capacities, and create integrated
solutions for asset management
programs. Andrew performs advanced hydrologic and
hydraulic calculations using multiple platforms, with
expertise in 1D and 1D-2D storm drain modeling. He is
proficient in tools like EPA SWMM, ICM, HEC-RAS, and
GIS integration with asset management programs. He
was integral in developing the GIS-based tool as part
of the CMTC DMP to quantify trash removal. He has
supported the County of San Diego with developing
similar trash compliance planning tools and is currently supporting the County with the development of a
roadmap to update the MS4 inventory in GIS.

WATER RESOURCES AND H&H |
MARIAH RODRIGUEZ will lead water
resources and H&H studies. Mariah
in the last two years supported the
County Field Engineering, Drainage
department perform plan check reviews
for compliance with County Hydrology
Manual, Hydraulic Design Manual, and BMP Design
Manual standards, for storm water infrastructure located within the public right-of-way. Mariah was the lead water resources designer on four plus trash capture design
projects for the County including the award-winning Los Coches Creek Dry Weather Diversion and Trash Capture
project. Regional full capture systems are typically
diverted off main storm drain conveyance facilities with the introduction of cleanouts, drop structures, and/or weir walls. A primary challenge in designing these systems
is ensuring that the existing storm drain conveyance
capacity is maintained, improved, or not negatively
impacted with the proposed improvements required to
divert low flows. This gets challenging when existing
storm drain systems are undersized and do not meet
current hydraulic design criteria. At the request of the County CIP division Mariah is currently developing a
memorandum that documents different types of analyses
and a preferred approach to perform hydraulic analysis to design a full capture system. The intent is to standardize the modeling approach to have consistency with project
designs and streamline project approvals.

CIVIL ENGINEERING | NICK
DORNER, PE will lead the PS&E
development. Nick is an Associate
Principal at RICK and oversees a group
of experienced staff. Nick has overseen
the design and preparation of PS&E
for trash capture devices (Avenida De
La Playa, Streamview Drive), numerous storm drain and
water quality projects, transportation infrastructure, water infrastructure, and public improvement projects. Nick
has broad experience throughout San Diego County
and his projects have been recognized by ASCE, APWA,
and ACEC. Nick’s involvement in many award-winning
projects provides him with the experience needed to
ensure that RICK and City standards are adhered,
enabling successful design and construction.

GIS ASSET MANAGEMENT |
MIKALA RANDICH will lead GIS Asset
Management related tasks. Mikala
specializes in integrating spatial data and
asset management software systems
to efficiently manage and analyze a
range of assets, including stormwater
infrastructure, roads, right-of-way, sidewalks, and more.

She concentrates on creating a successful end-to-end
product for clients, from determining target functionality requirements, efficient field data collection, technological data integrations, extensive support documentation,
and seamless product delivery. She enjoys sharing
innovations, lessons learned, and best practices with
other experts in the Public Works and geospatial fields and has presented on GIS/Asset Management projects at
the ESRI User Conference and the Public Works Expo at
the San Diego Convention Center.
08/12/2025
C7
174 of 237
15 City of Vista | Trash Capture BMP Device Analysis CIP 8343 AVAILABILITY & CAPACITY. RICK and our subconsultant team bring the experience, bandwidth, and flexibility required to successfully deliver the Trash Capture BMP Device Analysis project. We are committed to deploying the appropriate personnel with the time and expertise necessary to meet the City’s expectations. All proposed team members are available to serve in their designated roles for the full duration of the project. Our scalable team structure enables us to mobilize efficiently from day one, adapt to changes in project needs, and ensure continuous support through completion. We offer not only capacity but also the right combination of skills to meet project demands effectively and efficiently.
* Staffing level availability shown as an anticipated average percentage, with all staff available 100% when needed for the project.

PROPOSED PERSONNEL AVAILABILITY
PROPOSED PERSONNEL FIRM ROLE * AVAILABILITY
Venkat Gummadi, PE, QSD/P, CPESC RICK Principal-In-Charge & Project Manager 60% Brendan Hastie, PE, LEED AP RICK QA/QC & Strategic Advisor 20% John Quenzer, MS, CPSWQ, QSD/P D-Max QA/QC & Strategic Advisor; Trash Order Compliance 20%
Andrew Thies, CFM RICK Trash Order Compliance 60%
Teresa Lyndon, MS, CPSWQ, QISP, QSD D-Max Trash Order Compliance 60% Alexandra Cortes, MS, EIT D-Max Trash Order Compliance 70% Mariah Rodriguez RICK Water Resources / H&H 60%
Laura Henry, PE RICK Water Resources / H&H 10%
Christopher Mattox, PE RICK Water Resources / H&H 70%
Eric Hengesbaugh, PE, MS RICK Water Resources / H&H 70% Nick Dorner, PE RICK Civil 40%
Carson Edgington, PE RICK Civil 20%
Olivia Lincoln, PE RICK Civil 70%
Shavger Rekani, PE, CFM RICK Civil 40%
Geff Dye, PLS RICK Surveying & Potholing 20%
Gabriel Mercado AirX Surveying & Potholing 20%
Mikala Randich RICK GIS 60%
Mario Terrazas RICK GIS 80%
Ben Alonzo, GISP, MS, GIS RICK GIS 40%
08/12/2025
C7
175 of 237
16 City of Vista | Trash Capture BMP Device Analysis CIP 8343 VI. Experience
With decades of directly related project experience and comprehensive in-house water resources, civil engineering and surveying capabilities, the RICK Team presents unique benefits to the City. Our Team includes regional leaders in infrastructure design, H&H, and water quality. Our experience extends across all stages of a project life cycle, including planning, design, construction, and operation and maintenance (O&M). We have provided similar services for a variety of local municipalities and public agencies, including the cities of Santee, San Diego, and the County of San Diego.

RICK makes it a practice to stay at the forefront of interpreting and implementing regulation and criteria changes for hydrology and water quality. This local experience and familiarity with ever-changing criteria provide significant value to clients and project stakeholders. For example, four RICK staff who are proposed for this project are actively supporting the County Flood Control Section update the 2003 County of San Diego Hydrology Manual. These updates are planned for adoption later this year. We are familiar with the updates and, in consultation with the City, can incorporate these changes into the Trash Capture BMP Device Analysis.

CITY OF VISTA EXPERIENCE. RICK has worked in Vista for more than two decades providing water resources, surveying, mapping, and land development services for a variety of clients. For the City, RICK supported the development of the 1997 Master Plan of Drainage and the CMTC DMP.

As depicted in the adjacent map, RICK has worked on many projects in and around Vista. This experience equates to an understanding of local conditions and regulations and established relationships with City staff, regulators, and project stakeholders, which enhances our team’s ability to efficiently deliver the Trash Capture BMP Device Analysis.

RICK’s experience with the City in the past 5 years includes traffic control for the West Vista Way Sewer Improvement project.

D-Max has worked on stormwater projects for the City of Vista for over 20 years. Recently D-Max work has been focused on maintenance planning and reporting for Public Works staff. D-Max is also familiar with the City’s overall stormwater program and conveyance system through past work updating the City’s JRMP and completing field inspections and outfall monitoring.

Date: 12/8/2020 - Last saved by: MTERRAZAS - Path: \\cp.rickeng.com\projects\C_SD_W\Proposal\2020_11_VistaTrashOrderDMP\GIS\RickExperience_Vista.mxd 15 78

SAN MARCOSSAN MARCOS
5 76

CARLSBADCARLSBAD

OCEANSIDEOCEANSIDE

VISTAVISTA

UNICORPORATEDUNICORPORATED

SAN DIEGO COUNTYSAN DIEGO COUNTY

ESCONDIDOESCONDIDO
SOURCE: USGS
0 1 20.5
Miles
RICK Projects
RICK Water Resources Projects
RICK Experience Map
Vista, CA
City of Vista - Trash Order DMP
Date: 12/8/2020 - Last saved by: MTERRAZAS - Path: \\cp.rickeng.com\projects\C_SD_W\Proposal\2020_11_VistaTrashOrderDMP\GIS\RickExperience_Vista.mxd 15 78

SAN MARCOSSAN MARCOS
5 76

CARLSBADCARLSBAD

OCEANSIDEOCEANSIDE

VISTAVISTA

UNICORPORATEDUNICORPORATED

SAN DIEGO COUNTYSAN DIEGO COUNTY

ESCONDIDOESCONDIDO
SOURCE: USGS
0 1 20.5
Miles
RICK Projects
RICK Water Resources Projects
RICK Experience Map
Vista, CA
City of Vista - Trash Order DMP

RICK EXPERIENCE IN THE VISTA AREA
08/12/2025
C7
176 of 237
17 City of Vista | Trash Capture BMP Device Analysis CIP 8343 SPECIALIZED EXPERIENCE. The following
summarizes the RICK Team’s experience with the two
main elements for this Trash Capture BMP Device
Analysis project:
[ Trash Amendment Compliance Planning:

D-Max has been involved in Trash Amendments
compliance planning since the State Water Board
adopted them in 2015 and has supported more
than half of the San Diego County Copermittees.

The table below shows the Trash Amendments work
completed by D-Max for various San Diego County
Copermittees. D-Max will leverage this experience
to provide insights into different implementation and
compliance approaches. For Track 2 agencies like
the City of Vista, that includes how to take credit
for different structural and non-structural strategies, avoiding double counting strategies for BMPs in
the same vicinity, how to complete the Full Capture
System Equivalency calculations, and integrating
maintenance procedures and data collection into
the Public Works’ existing workflows and data
management systems.
[ Implementation of Trash Capture BMPs: RICK
brings unparalleled experience with design and
implementation of trash capture BMPS within
constrained ROWs and complex utility environments.

We have successfully designed and delivered
numerous award-winning trash capture projects in
the past five years for agencies including the County
of San Diego, City of Santee, and City of San Diego.

Several additional BMPs are currently in concept,
design, and construction phases and these are
highlighted in the project examples included in this
Section. We will leverage this experience to develop
30%, 90%, and final 100% design plans for selected
devices, including detailed layouts, hydrology,
cost estimates, and bid-ready documents per City
standards.

Compliance Track Evaluation
Track 1 Compliance Planning
Track 2 Implementation Plan
Full Capture System Design or
Feasibility Assessment
Equivalent Alternative Land
Use Methodology
Trash Source Identification
StudiesClient
City of Carlsbad 
City of Chula Vista    
City of El Cajon    
City of Encinitas  
City of Escondido     
City of Lemon Grove   
City of National City    
City of Oceanside     
City of Poway  
City of San Diego 
City of San Marcos  
City of Santee   
County of San Diego 
Port of San Diego   
08/12/2025
C7
177 of 237
18 City of Vista | Trash Capture BMP Device Analysis CIP 8343

SPECIALIZED EXPERIENCE KEY PERSONNEL

TRASH LOADING CALCULATIONS
30% CONCEPTS
90% PS&E
100% PS&E

VENKAT GUMMADI, PE, CPESC, QSD/P

JOHN QUENZER, CPSWQ, QSD/P

ANDREW THIES, CFM

MARIAH RODRIGUEZ

NICK DORNER, PE

MIKALA RANDICHPROJECTS
As-Needed Professional Storm Water Consulting &
Engineering Services, County of San Diego
(See Page 19)
        
Newman Environmental Wetland System (NEWS),
City of Newman
(See Page 20)      
Water Resources Engineering, MDS, & Plan Review
Services, City of Santee
(See Page 21)      
As-Needed Professional Storm Water Consulting &
Engineering Services, City of San Diego
(See Page 22)          
California Mandated Trash Cleanup Drainage Master
Plan, City of Vista
   
Auburn Creek Regional Trash Capture BMPs,
City of San Diego
        
Spring Valley Multi Benefit Planning Study,
County of San Diego
   
Streamview Drive Multi Use Treatment Area,
City of San Diego
      
Sweetwater Lane Park Trash Capture Project,
County of San Diego
    
Spring Valley Regional Trash Capture,
County of San Diego
   
Smugglers Gulch Improvements Project,
County of San Diego       
Trash Amendment Implementation Plan Update,
City of Carlsbad  
Trash Amendment Related Projects, Port of San Diego     Compliance and Implementation Planning for the San
Diego Trash Order, City of Oceanside   
Los Peñasquitos Outfall Retrofits for Trash Capture,
City of San Diego
      
Los Coches Dry Weather and Trash Capture Project,
County of San Diego
     
SPECIALIZED EXPERIENCE MATRIX. The
following matrix provides an overview of the RICK
Team’s relevant local experience in completing
similar projects within the last 5 years. These
projects included nearly identical services to those
anticipated for the Trash Capture BMP Device
Analysis. In most cases, the original team has
been in place for the duration of the assignment.

The matrix highlights the applicable specialized
experience as well as key personnel participation.

This project history demonstrates our proven
ability to provide all services required for the Trash
Capture BMP Device Analysis development.
08/12/2025
C7
178 of 237
19 City of Vista | Trash Capture BMP Device Analysis CIP 8343

COUNTY OF SAN DIEGO
As-Needed Professional Storm Water
Consulting & Engineering Services

COMPANY & PROJECT

MANAGER
County of San Diego
Stephanie Gaines,
Project Manager
(619) 964-8337
[email protected]

PROJECT DURATION
2015 - Ongoing

PROJECT VALUE
Sweetwater Lane Trash Capture
$250,000
Los Coches Trash Capture
$200,000
San Marino Drive Trash Capture
$110,000

SERVICES PROVIDED
[Trash Loading Calculations
[Trash Amendment Planning
Studies
[Feasibility Studies
[Preliminary Engineering
Reports
[PS&E Development

KEY PERSONNEL
[Venkat Gummadi
[Brendan Hastie
[Andrew Thies
[Mariah Rodriguez
[Laura Henry
[Chris Mattox
[Eric Hengesbaugh
[Nick Dorner
[Carson Edgington
[Olivia Lincoln
[Shavger Rekani
[Geff Dye
[Makaila Randich
[Mario Terrazas
[Ben Alonzo
Since 2015, RICK successful delivered over 30 task orders covering 23 projects associated with Trash Amendment related support to the County of San Diego Department of Public Works. These include planning level studies, preliminary concept development, preliminary engineering reports, PS&E development, and during construction support. Representative projects include:
[ Constructed trash capture projects include:

Z Sweetwater Lane Park Trash Capture Project
Z Los Coches Dry Weather Diversion Pilot Project
Z San Marino Drive Green Streets and Trash Capture Project [ PS&E for trash capture projects in progress:

Z South Mission Road (Northern Segment) Green Street Projects 1 (Currently in Bid)
Z Goldentop Road Modular Wetland and Trash Capture Project (Currently in Bid)
Z Smugglers Gulch (Treats 4 square miles)
[ Preliminary Engineering Reports for the following trash capture projects:

Z Estrella Park Biofiltration and Trash Capture (Constructed) Z Magnolia Avenue Green Street Project
Z South Mission Road (South) Green Street Project
Z Spring Valley Regional Trash Capture (Treats 6,000 acres) Z Sweetwater Road Green Street Project
Z Winter Gardens Infiltration Regional BMP
[ Trash Amendments Planning Studies
Z Spring Valley Trash Amendment Pilot Study Phase 1 and Phase 2 Z Countywide Inlet Mapping, Collection, and Drainage Area Delineations Sweetwater Lane
Trash Capture
Estrella Park Biofiltration
and Trash Capture
Spring Valley – Coanda Screen Alternative
Smugglers Gulch Trash Capture Fence
08/12/2025
C7
179 of 237
20 City of Vista | Trash Capture BMP Device Analysis CIP 8343

CITY OF NEWMAN
Newman Environmental Wetland System

COMPANY & PROJECT

MANAGER
City of Newman,
Council for Watershed Health
Darla Elswick, PhD
(805) 540-0145
[email protected]

PROJECT DURATION
2018 - Ongoing

PROJECT VALUE
Total Project: $5M
Trash Capture Retrofit:
$30,000 for 3 outfalls in the
basin and treats about 1,200
acres of City of Newman

SERVICES PROVIDED
[Trash Loading Calculations
[Concept Studies
[PS&E Development
[Water Quality and Hydraulic
Analysis
[Flow and Water Quality
Monitoring
[Grant Support

KEY PERSONNEL
[Venkat Gummadi
[Mariah Rodriguez
[Brendan Hastie
RICK collaborated with the Council for Watershed Health (CWH), Dr. Darla Elswick, and UC Merced to support the City of Newman’s vision to develop the Newman Community Conservation Area (NCCA), which is a large-scale plan focused on providing water quality, water resiliency, recreational, and wildlife benefits to the community. One component of the NCAA is the Newman Environmental Wetland System (NEWS) project designed to treat agricultural runoff and urban stormwater runoff and meet California State Trash Amendments. CWH and the project team supported the application and successful award of a State Water Resources Control Board’s (SWRCB) Proposition 1 Storm Water Technical Assistance grant to fund the project. RICK was responsible for initial project concept through complete engineering design (PS&E). Our team is supporting construction management throughout construction. The project is in the final stages of construction.

NEWS is a constructed stormwater treatment wetland designed to meet project performance and multi-benefit objectives set forth by the City and SWRCB. Its many benefits include decreasing pollutant loading to the San Joaquin River from urban and agricultural runoff, trash capture, mimicking natural wetland functions and processes, augmenting groundwater supply to the Delta-Mendota Subbasin, and providing community benefits such as recreation, aesthetic improvements, and environmental learning opportunities.

NEWS has three primary design features: a sediment forebay, high and low marsh, and micropool. Each feature targets different processes to improve water quality, remove trash, and opportunistic infiltration. The design includes approved Full Trash Capture devices to address the State Trash Amendments. Water treatment includes sedimentation, biological, and biochemical processes. Treated water flows back to Miller Ditch, and ultimately to the San Joaquin River.

Project performance assessment includes water quality monitoring and collection of information to support operational and maintenance needs. NEWS includes flow monitoring at key points, water level monitoring in basin, weather monitoring, and water quality sample collection. As part of a partnership between the City and University of California, Merced, Dr. Marc Buetel and Engineering Department students will conduct sample collection and data management. NEWS will provide a long-term educational benefit for Dr. Buetel’s students, serving as a real-world laboratory, fostering the next generation’s imagination and ingenuity for future GI design. Data and information gathered as part of the NEWS performance assessment will support on-going management of the project as well as informing similar designs statewide.

NEWS is uniquely designed to
form a butterfly, tying into the
theme of preserving natural open
space in the NCAA.
08/12/2025
C7
180 of 237
21 City of Vista | Trash Capture BMP Device Analysis CIP 8343

CITY OF SANTEE
City of Santee Water Resource Engineering,
MDS, & Plan Review Services

COMPANY & PROJECT

MANAGER
City of Santee
Steve Miller,
Principal Civil Engineer
(619) 258-4100 x176
[email protected]

PROJECT DURATION
2017 - Ongoing

PROJECT VALUE
Mast Park - $300,000

SERVICES PROVIDED
[ Trash Capture PS&E
[ H&H Studies and Review
[ Plan Review Services
[ GIS-Based Storm Drain
Inventory and Mapping
[ Capital Improvement
Projects (CIP) Planning and
Prioritization
[ Technical Assistance and
Regulatory Compliance for
Water Quality
[Grant Funding Support

KEY PERSONNEL
[Brendan Hastie
[Shavger Rekani
[Venkat Gummadi
[Andrew Thies
[Eric Hengeshbaugh
RICK has maintained a long-standing partnership with the City of Santee, significantly contributing to water resource management through multiple contracts.

Projects and consulting services provided through these contracts have enhanced water quality, improved drainage infrastructure, and ensured regulatory compliance, consistently supporting the City’s stormwater management and infrastructure goals.

This relationship reflects RICK’s commitment to quality and innovation.

As-Needed Civil Design: As a subconsultant, RICK led the water resource engineering for a variety of CIP projects from the conceptual stage through Final PS&E and construction (including long-term O&M planning and support). One award-winning project is highlighted below:
[ Mast Park: RICK played a pivotal role in identifying the opportunity to include Multi-Benefit Regional BMPs (and Trash Capture) into the large Park Redevelopment project. In expedited fashion, we supported the City in securing grant funding to integrate these additional elements into the project design and construction. The BMPs provide significant pollutant load reduction from hundreds of acres of otherwise untreated existing development previously discharging directly into SD River, while also increasing groundwater recharge, and allowing Disc Golf to be played throughout the series of swales and basins. Potential ACP credit was also calculated and “banked” for potential City use in the future.
[ Other Projects: Sycamore Creek Maintenance, Prospect-Mesa Pedestrian Crossing, Woodside Avenue Roundabout – Drainage and GI.

Master Drainage Study (MDS): In 2023, RICK updated the Citywide MDS with advanced hydrologic and hydraulic analysis, identifying key deficiencies and proposing seven high-priority Capital Improvement Projects (CIP). Our GIS-based updates support long-term stormwater management and future development planning.

As-Needed Plan Review Services: Since 2017, RICK has provided plan review services, reviewing drainage and water quality documents for both discretionary and ministerial permits. Our reviews of Drainage / H&H Studies, PDP SWQMPs, and PDP Exempt Green Street projects have ensured technical and regulatory standards are met, safeguarding Santee’s infrastructure, water resources, and compliance.

Mast Park
2023 Master Drainage Study
08/12/2025
C7
181 of 237
22 City of Vista | Trash Capture BMP Device Analysis CIP 8343

CITY OF SAN DIEGO
As-Needed Professional Storm Water
Consulting & Engineering Services

COMPANY & PROJECT

MANAGER
City of San Diego
Ronak Rekani,
Senior Civil Engineer
(619) 277-4125
[email protected]

PROJECT DURATION
2018 - Ongoing

PROJECT VALUE
ADLP Trash Capture - $860,000

SERVICES PROVIDED
[Hydrology and Hydraulics
[Drainage Design
[Trash Capture PS&E
[Surveying
[Mapping
[ADA Upgrades
[Street Resurfacing

KEY PERSONNEL
[Venkat Gummadi
[Brendan Hastie
[Andrew Thies
[Mariah Rodriguez
[Chris Mattox
[Eric Hengesbaugh
[Nick Dorner
[Olivia Lincoln
[ Shavger Rekani
[Geff Dye
[Makaila Randich
[John Quenzer
Since 2018, RICK supported with more than 10 projects associated with Trash Amendment related support to the City of San Diego Stormwater and Engineering and Capital Projects departments. These include preliminary concept development, PS&E development, and construction support.

Representative projects include:
[ Constructed trash capture projects include:

Z Avenida De La Playa (ADLP)
[ PS&E for trash capture projects in progress:

Z Southcrest Green Infrastructure (In construction)
Z Auburn Creek Regional Trash Capture BMPs (RICK and D-Max are collectively supporting the city on this project that will implement trash capture BMPs at 4 different locations along Auburn Creek) Z Streamview Drive Multi Use Treatment Area
Z Los Peñasquitos Lagoon outfall retrofits for trash capture (3 locations) [ Preliminary Concepts
Z Trash capture alternatives for Montongo Mitigation Site Z Maple Canyon Storm Drain Upgrade - Phase 3
08/12/2025
C7
182 of 237
23 City of Vista | Trash Capture BMP Device Analysis CIP 8343 VII. References
As requested in the RFP, three (3) references for projects that are similar in scope are provided below. These references correspond to the first three projects listed in Section VI: Experience. The projects are with similar scopes of work to those anticipated on this City project. We encourage you to contact these clients to confirm our qualifications, quality of work, and ability to control cost and maintain schedule.

County of San Diego
City of Newman
City of Santee
Location
Location
Location
Contact
Contact
Contact
San Diego, California
Newman, California
Santee, California
Stephanie Gaines, Project Manager
Darla Elswick, PhD, City of Newman
Steve Miller, Principal Civil Engineer
Address
Address
Address
Phone
Phone
Phone
5500 Overland Avenue, Suite 310,
San Diego, CA 92123
938 Fresno Street,
Newman, CA 95360
10601 N. Magnolia Avenue,
Santee, CA 92071
(619) 964-8337
(858) 540-0145
(619) 258-4100 x 176
Email
Email
Email
Number of
Projects
Number of
Projects
Number of
Projects
[email protected]
[email protected]
[email protected]
RICK has completed more than 40 task orders in the last five years for Stephanie’s group at the County.

These include multiple award winning trash capture projects that are constructed and operational.

Darla was the client representative overseeing RICK’s work in design of the NEWS project. The project construction is nearly complete. This project includes basin retrofit to treat City of Newman and comply with the State Trash Amendment Requirements.

RICK supported City of Santee with implementation of a regional trash capture device at Mast Park.

Reference 1:

Reference 2:

Reference 3:

Newman Environmental Wetland System – Trash Capture Retrofit – Treats 1,200 acres 08/12/2025
C7
183 of 237
24 City of Vista | Trash Capture BMP Device Analysis CIP 8343 VIII. Standard Hourly Bill Rates
BILLING. RICK will submit monthly
invoices with a progress report. The
progress report will include the reporting
period, work completed in the reporting
period, work anticipated in the upcoming
reporting period, critical path items/
decisions, and budget and schedule
update.

REIMBURSABLE AND
SUBCONSULTANT MARKUP.

Printing, reproduction, deliveries,
transportation, and other reimbursable
expenses will be billed at cost.

Subconsultant markup is listed at 4%
of total price to cover overhead and
administration.

RICK – HOURLY BILL RATES

PERSONNEL LABOR CATEGORY HOURLY RATE
Venkat Gummadi
Brendan Hastie
Carson Edgington
Principal $300
Geff Dye
Nick Dorner
Shavger Rekani
Associate Principal $280
Associate/Manager $260
Andrew Thies
Olivia Lincoln Principal Project Manager $245
Chris Mattox
Eric Hengesbaugh
Laura Henry
Associate Project Manager $220
Mariah Rodriguez Assistant Project Manager $200
Senior Technical Manager $200
Principal Designer $175
Associate Designer $160
Assistant Designer $145
Mikala Randich GIS Asset Manager $200
Ben Alonzo
Mario Terrazas
GIS Project Manager/
Programmer $180
Party Chief (Prevailing Wage) $225
Chainman (Prevailing Wage) $195
Survey Analyst $200
Project Administrator $90
Applicable to City of Vista Trash Capture BMP Device Analysis – Effective till December 31, 2026
08/12/2025
C7
184 of 237
25 City of Vista | Trash Capture BMP Device Analysis CIP 8343 IX. Exceptions to RFP
X. Addenda to the RFP
Authorized Signer
RICK reviewed, understands, and takes no exceptions to the City’s RFP, all issued addenda, and the terms of the City’s Standard Consulting Agreement.

RICK acknowledges that there has been no addenda issued via ProcureNow for this RFP.

RICK acknowledges Q&A Released on May 12, 2025.

Project Manager, Venkat Gummadi, PE, QSD/P, CPESC is authorized to sign and bind RICK to this proposal. Our proposal is made without collusion with any other person, persons, company, or parties submitting a proposal and is in all respects fair and in good faith without collusion or fraud.

Venkat Gummadi, PE, QSD/P, CPESC
Principal, Project Manager
Los Coches Dry Weather Diversion and Trash Capture Project.

Construction Completed in July 2024 and treats 162 acres. 08/12/2025
C7
185 of 237
26 City of Vista | Trash Capture BMP Device Analysis CIP 8343 APPENDIX:

RESUMES
08/12/2025
C7
186 of 237
* Not counted towards page count.

A-1
Venkat Gummadi PE, QSD/QSP , CPESC
Principal-in-Charge/Project Manager
Venkat will lead this project, overseeing all aspects including staffing, schedule and cost management, and deliverable quality. Venkat is a Principal at RICK, where he manages a design team for preparing hydrologic, hydraulic, and water quality treatment analyses and design. He is well-versed in leading multidisciplinary teams and delivering successful outcomes for projects similar to the City’s Trash Capture BMP Device Analysis project. Venkat was the lead author on multiple regional guidance documents, including Model BMP Design Manual, Watershed Management Area Analysis, phase two of the Water Quality Equivalency Guidance Document, and is currently supporting the County Flood Control Section with updates to the 2003 County Hydrology Manual that is planned for adoption in 2025.

PROJECT EXPERIENCE
City of Vista, California Mandated Trash Cleanup Drainage Master Plan, Vista, CA: Venkat was the Project Manager that supported the City develop a planning level Trash Order Drainage Master Plan to identify multibenefit structural strategies that the City can implement to meet the State Trash Amendment requirements. This study included: i) compilation of high-resolution geospatial data for the PLU storm drain system within the City’s sphere of influence. This included development of a comprehensive Geographic Information System inventory of structure and conveyance features within the study area; ii) estimate flow conveyance capacity of the existing drainage systems draining PLU areas. Drainage assessment includes hydrologic and hydraulic (H&H) analysis performed to establish the level of service of the storm drain system; and iii) identification of regional and subregional structural strategies that can be used to meet the remaining trash load reduction requirements while also providing additional benefits such as flood resiliency and water quality improvements.

City of Newman, Newman Environmental Wetland System (NEWS), Newman, CA: Venkat was the Project Manager responsible for designing water resources elements of a constructed stormwater treatment wetland designed to meet project performance and multi-benefit objectives set forth by the City of Newman and SWRCB.

NEWS has three primary design features: a sediment forebay, high and low marsh, and micropool. Each feature targets different processes to improve water quality, remove trash, and opportunistic infiltration. The design includes approved Full Trash Capture devices to address the State Trash Amendments for approximately 1,200 acres.

County of San Diego, Spring Valley Regional Trash Capture – Initial Analysis, San Diego, CA: Venkat is currently serving as the Principal-in-Charge supporting the County with preparation of a PER initial analysis for the Spring Valley Regional Trash Capture located within Spring Valley Community. The PER initial analysis is evaluating 5 options for providing trash capture at the Caltrans culvert outfall (contributing drainage area of 6,000 acres). The five options that are being evaluated are: 1) Upstream diversion with subsurface trash device at outfall; 2) Subsurface trash device at outfall with pump and storage vaults; 3) Subsurface trash device at outfall with downstream confluence; 4) COANDA device at outfall; and 5) Trash net at outfall.

Caltrans is planning to fund a portion of this project, and the County is planning to move this project to PS&E development and construction.

EXPERIENCE
17 Years

EDUCATION
MS, Civil Engineering,
San Diego State University
BS, Civil Engineering,
Gandhi Institute of Technology
and Management (GITAM)

REGISTRATION/

CERTIFICATION
Professional Engineer (PE), CA
No. 81958
Qualified SWPPP Developer
(QSD) / Qualified SWPPP
Practitioner (QSP), No. 268
Certified Professional in
Erosion and Sediment Control
(CPESC), No. 6027

PROFESSIONAL

AFFILIATIONS
California Stormwater Quality
Association (CASQA)
08/12/2025
C7
187 of 237
* Not counted towards page count.

A-2
Brendan Hastie PE, LEED AP
QA/QC & Strategic Advisor
Brendan Hastie will serve as QA/QC and Strategic Advisor for this contract. Brendan has dedicated his entire career to specializing in stormwater-related programs and projects, bringing over two decades of experience in supporting the County. He has played a pivotal role in the local community’s engagement with the 2001, 2007, and 2013 MS4 Permits for the San Diego Region, frequently delivering presentations and participating in Technical Advisory Committees alongside the RWQCB, County, and various stakeholder groups. Since 2015, Brendan has adeptly managed this contract and will continue to oversee task order managers, subcontractors, and support staff upon its renewal. His expertise in leading multi-disciplinary teams and delivering high- quality projects ensures a veteran project manager who deeply understands the needs of the County, the demands of the contract, and the nuances of managing tasks from inception to close-out.

PROJECT EXPERIENCE
City of Vista, California Mandated Trash Cleanup Drainage Master Plan, Vista, CA: Brendan was the Principal-in-Charge that supported the City develop a planning level Trash Order Drainage Master Plan to identify multibenefit structural strategies that the City can implement to meet the State Trash Amendment requirements. This study included: i) compilation of high-resolution geospatial data for the PLU storm drain system within the City’s sphere of influence. This included development of a comprehensive Geographic Information System inventory of structure and conveyance features within the study area; ii) estimate flow conveyance capacity of the existing drainage systems draining PLU areas. Drainage assessment includes hydrologic and hydraulic (H&H) analysis performed to establish the level of service of the storm drain system; and iii) identification of regional and subregional structural strategies that can be used to meet the remaining trash load reduction requirements while also providing additional benefits such as flood resiliency and water quality improvements.

City of Santee, Mast Park, Santee, CA: Brendan played a pivotal role in identifying the opportunity to include Multi-Benefit Regional BMPs (and Trash Capture) into the large Park Redevelopment project. In expedited fashion, we supported the City of Santee in securing grant funding to integrate these additional elements into the project design and construction. The BMPs provide significant pollutant load reduction from hundreds of acres of otherwise untreated existing development previously discharging directly into San Diego River, while also increasing groundwater recharge, and allowing Disc Golf to be played throughout the series of swales and basins. Potential ACP credit was also calculated and “banked” for potential use in the future.

City of Newman, Newman Environmental Wetland System (NEWS), Newman, CA: Brendan was the Principal-in-Charge responsible for designing water resources elements of a constructed stormwater treatment wetland designed to meet project performance and multi-benefit objectives set forth by the City of Newman and SWRCB.

NEWS has three primary design features: a sediment forebay, high and low marsh, and micropool. Each feature targets different processes to improve water quality, remove trash, and opportunistic infiltration. The design includes approved Full Trash Capture devices to address the State Trash Amendments for approximately 1,200 acres.

EXPERIENCE
25 Years

EDUCATION
BS, Civil Engineering,
Penn State University

REGISTRATION/

CERTIFICATION
Professional Engineer (PE), CA
No. 65809
LEED Accredited Professional,
USGBC

PROFESSIONAL

AFFILIATIONS
FMA, APWA; CASQA, ULI,
WQIP for San Diego River,
Green BMP Workgroup for San
Diego River Watershed,
County of San Diego Low
Impact Development Handbook
Update (2014)
City of San Diego Alternative
Compliance Program (2017)
County of San Diego Regional
Storm Water Capture and
Feasibility Study (2018)
County of San Diego Hydrology
Manual Update (2019)
08/12/2025
C7
188 of 237
* Not counted towards page count.

A-3
John Quenzer MS, CPSWQ, QSD/P
QA/QC & Strategic Advisor; Trash Order Compliance
John Quenzer is an environmental scientist with extensive experience in the development and implementation of municipal storm water programs.

PROJECT EXPERIENCE
City of Escondido, Trash Order Implementation Planning and Mapping, Escondido, CA: Prepared compliance track overview. Developed criteria for Full Capture System location selection, cost estimations for the 10-year compliance timeframe, Track 1 submittals to the Regional Board, and alternative land use swapping methodology. Oversaw a pilot monitoring study to evaluate hydraulic impact of large connector pipe screens that treat multiple upstream storm drains and an evaluation of regional trash capture device feasibility.

City of Oceanside, Trash Amendments Compliance Planning, Oceanside, CA:

Prepared compliance track overview. Oversaw estimates for the 10-year compliance time frame, device locations, drainage area delineations, and Track 1 submittal.

Currently working on developing a Track 2 implementation plan.

City of El Cajon, Trash Amendments Compliance Planning, El Cajon, CA:

Prepared compliance track overview. Once the City selected Track 1, prepared a feasibility analysis to identify FCD installation criteria at select Priority Land Uses within the City. Managed a hydraulics assessment and prioritized trash control device locations based on that analysis. Prepared Alternative Land Use Memorandum, cost estimates for the 10-year compliance time frame, FCD selection and delineations, and submittals to the Regional Board.

City of Carlsbad, Trash Amendments Compliance Planning, Carlsbad, CA:

Carlsbad, CA. Project Manager. Updating to the City’s Track 2 implementation plan to improve usability and incorporate proposed regional trash capture device.

City of San Marcos, Trash Amendments Compliance Planning, San Marcos, CA:

Project Manager. Revising the City’s Track 2 implementation plan and internal data management procedures.

City of Encinitas, Trash Amendments Compliance Planning, Encinitas CA:

Project Manager. Developed the City’s Track 2 implementation plan.

Trash Amendments Compliance Planning, National City, CA: Project Manager.

Developed the City’s Track 2 implementation plan; completed trash control BMP feasibility evaluations.

Port of San Diego, Equivalent Alternative Land Use Methodology, San Diego, Ca. Project Manager. Currently working to develop a substitution methodology for locations where trash control devices are not feasible.

EXPERIENCE
22 Years

EDUCATION
MS, Environmental Engineering
and Science, Johns Hopkins
University,
BS, Environmental Chemistry,
University of California, San
Diego

REGISTRATION/

CERTIFICATION
Certified Professional in Storm
Water Quality (CPSWQ),
No. 693
Qualified SWPPP Developer
(QSD)/Qualified SWPPP
Practitioner (QSP), No. 24039
08/12/2025
C7
189 of 237
* Not counted towards page count.

A-4
Andrew Thies CFM
Trash Order Compliance
Andrew Thies will lead trash order compliance related tasks. He specializes in using GIS to develop asset inventories, assess conditions, model capacities, and create integrated solutions for asset management programs. Andrew performs advanced hydrologic and hydraulic calculations using multiple platforms, with expertise in 1D and 1D-2D storm drain modeling. He is proficient in tools like EPA SWMM, ICM, HEC-RAS, and GIS integration with asset management programs. He was integral in developing the GIS-based tool as part of the CMTC DMP to quantify trash removal. He has supported the County of San Diego with developing similar trash compliance planning tools and is currently supporting the County with the development of a roadmap to update the MS4 inventory in GIS.

PROJECT EXPERIENCE
City of Vista, California Mandated Trash Cleanup Drainage Master Plan, Vista, CA: Andrew was the Deputy Project Manager that supported the City develop a planning level Trash Order Drainage Master Plan to identify multibenefit structural strategies that the City can implement to meet the State Trash Amendment requirements. This study included: i) compilation of high-resolution geospatial data for the PLU storm drain system within the City’s sphere of influence. This included development of a comprehensive Geographic Information System inventory of structure and conveyance features within the study area; ii) estimate flow conveyance capacity of the existing drainage systems draining PLU areas. Drainage assessment includes hydrologic and hydraulic (H&H) analysis performed to establish the level of service of the storm drain system; and iii) identification of regional and subregional structural strategies that can be used to meet the remaining trash load reduction requirements while also providing additional benefits such as flood resiliency and water quality improvements.

County of San Diego, Countywide Inlet Mapping, Collection, and Drainage Area Delineations, San Diego, CA: Andrew served as Project Manager. RICK prepared inlet mapping and delineations to over 5,500 inlets collecting surface flow within County of San Diego. The existing inlet and storm drain inventory were edited and corrected to align with the 2014 or later LiDAR and imagery. Inlets were flagged if they received flow from priority land use (PLU) areas. To support the effort to comply with the State Trash Amendments, part of the final submittal provided contributing acres to each of these inlets and the area and type of PLU and non-PLU area within the contributing area along with a pathway to compliance.

County of San Diego, Rainbow Creek Watershed Implementation Plan, San Diego, CA: The Rainbow Creek Watershed Implementation Plan was prepared to achieve TMDL compliance within the Rainbow region of the Santa Margarita watershed of the County of San Diego. Efforts included compiling and correcting the existing inventory, identifying priority outfalls, and creating a 1D/2D H&H model to determine potential drainage impacts on proposed structural BMPs. Work aimed to provide improved water quality benefits without negatively impacting flood conditions and culminated in six final PERs.

City of Lemon Grove, Lemon Grove Drainage Master Plan, Lemon Grove, CA:

Andrew served as Project Manager for this project, where he assessed the drainage components of the DMP by utilizing high-resolution spatial datasets to generate detailed H&H models. A holistic modeling program was used to prepare models for the 2, 10, and 100-Year (24-Hour) storm events for over five square miles of the City.

EXPERIENCE
12 Years

EDUCATION
BS, Civil Engineering,
San Diego State University

REGISTRATION/

CERTIFICATION
ASFPM Certified Floodplain
Manager, No. US-17-09950

PROFESSIONAL

AFFILIATIONS
California Stormwater Quality
Association (CASQA)
Floodplain Management
Association (FMA)
American Public Works
Association (APWA)
08/12/2025
C7
190 of 237
* Not counted towards page count.

A-5
Teresa Lyndon MS, CPSWQ, QISP , QSD
Trash Order Compliance
Teresa Lyndon is an environmental scientist with a strong background in Trash Amendments implementation planning and Municipal storm water permit compliance.

PROJECT EXPERIENCE
Trash Order Implementation Planning and Mapping, Escondido, CA: Used ArcHydro GIS tools to prepare inlet scale drainage area delineations for the City, and then oversaw manual QC to refine the automated delineations. Once the City selected Track 1, assisted with Full Capture System location selection, drainage area delineations, cost estimations for the 10-year compliance timeframe, submittals to the Regional Board, and alternative land use swapping methodology. Worked with the City to develop a pilot monitoring study for large Connector Pipe Screens that treat multiple upstream storm drains. Worked with the City to determine how information will be tracked in their asset management database for annual reporting. Prepared analysis of Regional BMPs and cost estimates.

City of El Cajon, Trash Amendments Compliance Planning, El Cajon, CA: In 2018, assisted with the Alternative Land Use Memorandum methodology submitted to the Regional Board. Conducted field assessments with City staff and selected trash control device locations and associated delineations in subsequent years.

Trash Amendments Compliance Planning, Oceanside, CA: Prepared a comparison of the Track 1 and Track 2 compliance pathways. Once the City selected Track 1, assisted with the completion of a Feasibility Analysis which determined FCS installation criteria at select Priority Land Uses within the City. She worked with the City to prepare and Alternative Land Use Memorandum, cost estimates for the 10-year compliance time frame, trash control device selection and delineations, and is working to track information in the City’s asset management database.

Storm Water Services, Lemon Grove, CA: Assisted with preparation of 2018 track 1 submittals to the Regional Board. Currently working on device locations for FY 26.

Equivalent Alternative Land Use Methodology, Port of San Diego: Oversaw the preparation of trash control device drainage area delineations and coordinated field visits for pilot devices. Coordinated with vendors to determine device feasibility and updated cost estimates for FY 25. Currently working to develop a substitution methodology for locations where a small individual inlet trash control device is not feasible.

Storm Water Services, Santee, CA: In 2018, worked with the City to prepare cost estimates to select specific FCD locations for the 10-year compliance timeframe.

Prepared the Jurisdictional Map and Time Schedule submittal to the Regional Board for compliance with the Trash Order. Recently, prepared revised list of planned trash control device locations based on new installation criteria and constraints based on vendor feedback. Also provided updated cost estimates for FY 25 through FY 30 based on inflation and anticipated steel tariffs.

EXPERIENCE
11 Years

EDUCATION
MS, Environmental Science,
California State University,
Chico
BA, Environmental Analysis and
Design, University of California,
Irvine

REGISTRATION/

CERTIFICATION
Qualified Industrial Storm Water
Practitioner (QISP), No. 01208
Certified Professional in Storm
Water Quality (CPSWQ),
No. 1416
Qualified SWPPP Developer
(QSD)/Qualified SWPPP
Practitioner (QSP), No. 28244
08/12/2025
C7
191 of 237
* Not counted towards page count.

A-6
Alexandra Cortes MS, EIT
Trash Order Compliance
Alexandra Cortes is an engineer with experience in water resources, storm water drainage design, and sustainability.

PROJECT EXPERIENCE
City of San Diego, Auburn Creek Trash Capture Devices, San Diego, CA: As Support Staff, responsibilities included review of the design of several full capture systems, and regional best management practices. Reviewed feasibility of proposed locations as compared to alternative locations, considering proposed capacity, required head, utility conflicts, and elements that could complicate maintenance.

Where feasible, new locations were suggested.

City of San Diego, Mission Bay Watershed and San Diego River Master Plans, Support Staff. As Support Staff, Alexandra mapped stormwater conveyance system features and updated attributes based on reviewing as-built plans. Prepared one-dimensional and two-dimensional hydraulic analysis of the Mission Bay and San Diego River watersheds using PCSWMM to identify areas of flooding and potential locations for regional Best Management Practices. Developed cost estimates and project prioritization scoring system for proposed improvements.

City of San Diego, CIP Concept Designs, Support Staff. As Support Staff, prepared hydrology and hydraulics studies in PCSWMM, HEC-HMS, HEC-RAS, HY-8, and WSPG to evaluate potential drainage improvements at sites in the Mission Bay and San Diego Bay watersheds. Developed alternatives analyses, level of service evaluations, and cost estimates. Evaluated performance in existing conditions and climate change scenarios.

City of San Diego, Waterways Maintenance Plan, Support Staff, San Diego, CA:

As Support Staff, developed detailed CAD models of open proposed design, removal/ repair quantities and recommendations for maintenance activities were provided to the city and incorporated into a City-wide maintenance plan.

San Diego Unified Port District, Trash Amendments Compliance Planning, Support Staff, San Diego, CA: As Support Staff, completed field work and drainage area delineations to assess feasibility for full capture system installation in approximately 20 locations in the Port’s drainage system. Prepared BMP Design Manual update that incorporates requirements to install trash control BMPs.

County of San Diego, Flood Control Support, San Diego, CA: As Support Staff, reviewed Letter of Map Revision and Conditional Letter of Map Revision (LOMR/ CLOMR) applications submitted by private developments for acceptance by FEMA to assure compliance with FEMA and County floodplain and floodway requirements.

Reviewed HEC-RAS models and hydrologic/hydraulic analyses associated with the re-mapping of the floodplain and/or floodway.

EXPERIENCE
4 Years

EDUCATION
MS, Environmental Engineering,
University of California,
Berkeley
BS, Renewable Energy
Engineering, CETYS University,
Mexico

REGISTRATION/

CERTIFICATION
HAZWOPER 40 certified
08/12/2025
C7
192 of 237
* Not counted towards page count.

A-7
Mariah Rodriguez EIT
Water Resources / H&H
Mariah Rodriguez is an Assistant Project Manager at RICK with extensive experience working on public agency projects, specializing in hydrologic and hydraulic studies supporting street improvements and bridge analyses and the design of Low Impact Development (LID) and Hydromodification Management facilities in support of water quality objectives. Additionally, Mariah has experience preparing and reviewing Water Quality Management Plan (WQMP) reports in the region and processing Conditional Letter of Map Revisions (CLOMRs) and Letter of Map Revisions (LOMRs) through FEMA. She is currently supporting the County develop a guidance document to standardize hydraulic analysis for trash capture devices.

PROJECT EXPERIENCE
County of San Diego, Department of Public Works Field Engineering, Drainage Technical Assistance, San Diego, CA: Mariah is currently working as adjunct staff for the County of San Diego Department of Public Works, Field Engineering, Drainage department performing plan check reviews for compliance with County Hydrology Manual, Hydraulic Design Manual, and BMP Design Manual standards, for storm water infrastructure located within the public right-of-way. Tasks include reviewing and processing plans, technical studies, and calculations for improvements within the public right-of-way. Additionally, Mariah provides support for coordination and meetings with engineers / clients to discuss project related comments and resolve project issues.

County of San Diego, Los Coches Creek Dry Weather Diversion Pilot Program, San Diego, CA: County of San Diego, Los Coches Creek Dry Weather Diversion Pilot Program, San Diego, CA: Mariah served as the Lead Water Resources Designer for the analysis and design of an off-line stormwater diversion system providing trash capture and dry weather flow treatment. The proposed design will divert dry weather and wet weather flows from the main storm drain line to full capture treatment control device. Dry weather flows will be diverted from the treatment control device to a nearby sanitary sewer for treatment. During wet weather conditions, the diversion and full-capture treatment control device have been designed to capture and treat the peak flow rate resulting from a 1-year, 1-hour storm event, to meet the States Trash Amendment requirements, prior to reaching its outfall location at Los Coches Creek.

This project will serve as a pilot program for treatment of persistent dry weather flows.

A Drainage Study and Standard Stormwater Quality Management Plan (SWQMP) were prepared to support the plan sets documenting the methodologies and results of the analyses performed.

County of San Diego, Woodside Basin Retrofit - Limited Preliminary Engineering Report, San Diego, CA: Mariah is serving as the Lead Water Resources Designer for the analysis and conceptual design of retrofitting existing storm drain infrastructure near Woodside Avenue Basin. Hydrologic, hydraulic, and continuous simulation water-quality modeling are being performed to quantify existing baseline conditions, which will be used to compare proposed retrofit options. These options include (1) retrofitting the existing debris structure to meet California Trash Amendment requirements, treating the entire upstream watershed; (2) optimizing the diversion geometry conveying stormwater to Woodside Avenue Basin; and (3) retrofitting the outlet structure at the downstream end of the basin. The study uses realtime data to assess water-quality benefits of the retrofits.

EXPERIENCE
7 Years

EDUCATION
BS, Civil Engineering,
California State University, San
Luis Obispo

REGISTRATION/

CERTIFICATION
Engineer-in-Training (EIT), CA
No. 164295
08/12/2025
C7
193 of 237
* Not counted towards page count.

A-8
Laura Henry PE
Water Resources / H&H
Laura Henry is an Associate Project Engineer with RICK. Laura is part of a design team for hydrologic and hydraulic analyses for private development and public works projects. She has contributed to the preparation of several local design manuals and standards, including; the San Diego County Hydrology Manual (June 2003) and the Model BMP Design Manual (Feb. 2016, updated 2018). Laura attends meetings of the Technical Advisory Committee for the Hydromodification Management Plan for San Diego County, and has extensive experience preparing and reviewing hydromodification management studies. She is familiar with water quality issues in San Diego County and appropriate BMPs to target pollutants of concern. Laura has extensive experience in drainage design. She has designed storm water conveyance structures, detention and desilting basins, trash capture devices, low impact development (LID) features, structural pollutant control best management practices (BMPs) including bioretention and biofiltration BMPs, hydromodification management features, erosion protection, and storm water treatment units.

PROJECT EXPERIENCE
Prepare Text for San Diego County Hydrology Manual Addressing NOAA Atlas 14 Precipitation Data, San Diego, CA: At the County of San Diego’s request, Laura authored new sections of the County Hydrology Manual that incorporates NOAA Atlas 14 precipitation data and led the preparation of example calculations for the Hydrology Manual Workbook. In addition, Laura made multiple presentations to the TAC to facilitate review and update of new manual material. This manual update is planned for adoption in early 2025.

San Diego County Regional Watershed Management Area Analysis (Regional WMAA), San Diego, CA: Laura prepared portions of the San Diego County Regional WMAA, a document prepared for the San Diego County Storm Water Copermittees under the 2013 Municipal Storm Water Permit. She prepared GIS data and exhibits characterizing 27 San Diego County streams, identifying natural and engineered reaches, constrictions, armoring, crossings, and structures. She prepared criteria and mapping for hydromodification management plan applicability and exemptions. She prepared criteria for determining stabilized conveyance systems that may qualify for exemption from hydromodification management requirements.

Support for Mission Valley Community Plan Update EIR, San Diego, CA: Laura prepared a Water Resources Technical Report discussing existing drainage and water quality issues in the Mission Valley Community. The study evaluated local “onsite” drainage and water quality issues for storm water runoff originating in the community as well as watershed characteristics and watershed-wide water quality issues for the San Diego River and three major tributaries of the San Diego River (Alvarado Creek, Murphy Canyon Creek, and Murray Canyon Creek). She prepared text for the EIR discussing riverine flooding issues related to the San Diego River including levees, low-water crossings, and grade controls.

City of El Cajon Downtown Specific Plan Study Area Existing Condition Drainage Master Plan, El Cajon, CA: Laura prepared existing condition hydrologic analyses for the Downtown Specific Plan Study Area (approximately 0.82 square miles), identified existing condition capacities and locations of potential deficiencies in the existing storm water conveyance system, and identified portions of the study area subject to the requirements of the NFIP. Watersheds studied include County Ditch Creek, Washington Creek, and a portion of the Forester Creek.

EXPERIENCE
26 Years

EDUCATION
MS, Civil Engineering,
San Diego State University
BS, Civil Engineering,
San Diego State University

REGISTRATION/

CERTIFICATION
Professional Engineer (PE), CA
No. 61535
08/12/2025
C7
194 of 237
* Not counted towards page count.

A-9
Christopher Mattox PE
Water Resource Engineering
Christopher (Chris) Mattox is an Associate Project Manager in RICK’s Water Resources Division. Chris serves on a design team that prepares hydrologic and hydraulic analyses, drainage system design, water quality, trash capture devices, and hydromodification management designs for public works and private developments projects. He has extensive experience using continuous simulation models (i.e., Stormwater Management Model (SWMM) and San Diego BMP Sizing Spreadsheet) to analyze projects for compliance with Final Hydromodification Management Criteria.

He has prepared numerous PDP SWQMPS, WQMPs, and HMPs and is skilled in the use of HEC-1, HEC-HMS, and the Rational Method for hydrologic modeling and basin routing, as well as HEC-RAS, and CivilGeo for hydraulic and sediment transport analysis.

PROJECT EXPERIENCE
County of San Diego, Mapleview Street Green Infrastructure Improvement Preliminary Engineering Report, San Diego, CA: Chris led the development of a conceptual-level Preliminary Engineering Report (PER) for a portion of Mapleview Street in association with the County of San Diego Watershed Protection Programs (WPP) initiative to improve stormwater quality through implementation of a “complete street” (Green infrastructure improvements). Five (5) conceptual water quality design alternatives were ultimately developed as part of this effort. Also, a hydrologic and hydraulic analysis was prepared to address flooding concerns by evaluating the capacity of an existing culvert and downstream flood control channel at the intersection of Ashwood Street and Mapleview Street. Chris currently serves as the project engineer for the construction document stage and final technical reports, including the drainage study and Green Streets SWQMP, which are prepared in support of the final PS&E.

County of San Diego, South Mission Road (Northern Segment) Green Street Projects 1 and 2, San Diego, CA: Chris is currently serving as the Water Resources Project Manager currently supporting the County with development of PS&E for the South Mission Road (Northern Segment) Green Street Projects 1 and 2 in Fallbrook Community. The project will use green infrastructure elements to capture and treat stormwater runoff from a 21.7-acre drainage area composed of commercial, transportation, and other land uses along South Mission Road in Fallbrook. The project benefits include stormwater treatment provided by tree wells, biofiltration basins, and a below-ground trash capture device and implementation of ADA-compliant sidewalk improvements to enhance pedestrian access..

ADDITIONAL PROJECT EXPERIENCE:
[ County of San Diego, Estrella Park Water Quality Improvement Preliminary Engineering Report, San Diego, CA
[ County of San Diego, Goldentop Road Water Quality Improvement PS&E, San Diego, CA
[ County of San Diego, Ashwood Street Corridor Improvements, San Diego, CA
[ County of San Diego, Woodside Avenue Sidewalk Improvement Project, San Diego, CA

EXPERIENCE
11 Years

EDUCATION
BS, Environmental Engineering,
North Carolina State University

REGISTRATION/

CERTIFICATION
Professional Engineer (PE), CA
No. 96303
NC, No. 053039

PROFESSIONAL

AFFILIATIONS
American Society of Civil
Engineers (ASCE)
American Public Works
Association (APWA)
08/12/2025
C7
195 of 237
* Not counted towards page count.

A-10
Eric Hengesbaugh PE
Water Resource Engineering
Eric Hengesbaugh is an Associate Project Manager in RICK’s Water Resources Division where he manages a design team that focuses on hydrologic and hydraulic analyses, drainage system design, water quality, trash capture devices, and hydromodification management designs for public works projects and private developments. Eric has also been a lead in the effort for the City of San Diego to inspect drainage assets including culverts, basins, and channels.

PROJECT EXPERIENCE
County of San Diego, Top Ten Green Streets Review, San Diego, CA: Eric is currently supporting the County with an initial analysis for 10 projects identified in the Green Streets Clean Water Plan. The 10 projects are in Lakeside, Ramona and North County Metro Communities. The initial analysis includes confirmation of drainage areas and available right-of-way, creating updated concept exhibits, and performing water quality calculations.

County of San Diego, Magnolia Avenue Green Streets Project, San Diego, CA:

Eric supported the County with development of a limited PER for Magnolia Avenue Green Streets Project located within the communities of Lakeside and Bostonia. The project is intended to reduce pollutants from stormwater runoff into Forester Creek and the San Diego River through the installation of green infrastructure elements, including a trash capture element. The project investigated Magnolia Avenue and three other potential areas, including portions of Vernon Way, West Bradley Avenue and Denny Way, to address drainage and water quality benefits in these areas.

City of Chula Vista, Alternative Compliance Program through NSMPs, Chula Vista, CA: Eric served as the project engineer to assist the City of Chula Vista in the development of alternative compliance credits based on the additional water quality benefits that are generated through NSMPs. Eric also presented the program to the San Diego Regional Water Quality Control Board, and the program was approved in 2023. This project was funded through the SB 2 Planning Grant..

ADDITIONAL PROJECT EXPERIENCE:
[ County of San Diego, South Mission Road (South) Green Street Project, San Diego, CA
[ County of San Diego, Guajome Park BMP and Sports Complex BMP Initial Analysis, San Diego, CA
[ County of San Diego, Woodside Avenue Green Infrastructure Improvement Final Engineering Report, San Diego, CA
[ City of San Diego, Southcrest Green Infrastructure, San Diego, CA

EXPERIENCE
7 Years

EDUCATION
MS, Recreation Sports
Management,
Cal State University, Northridge
BS, Civil & Environmental
Engineering,
University of California, Los
Angeles

REGISTRATION/

CERTIFICATION
Professional Engineer (PE), CA
No. 93931

PROFESSIONAL

AFFILIATIONS
Floodplain Managers
Association – Emerging
Professionals
San Diego Regional
Representative
08/12/2025
C7
196 of 237
* Not counted towards page count.

A-11
Nick Dorner PE
Civil
Nick Dorner will lead the PS&E development. Nick is an Associate Principal at RICK and oversees a group of experienced staff. Nick has overseen the design and preparation of PS&E for trash capture devices (Avenida De La Playa, Streamview Drive), numerous storm drains and water quality projects, transportation infrastructure, water infrastructure, and public improvement projects. Nick has broad experience throughout San Diego County and his projects have been recognized by ASCE, APWA, and ACEC. Nick’s involvement in many award-winning projects provides him with the experience needed to ensure that RICK and City standards are adhered, enabling successful design and construction.

PROJECT EXPERIENCE
City of San Diego, Avenida De La Playa Emergency Storm Drain, San Diego, CA: Nick served as Project Engineer for this award-winning emergency storm drain design project. This Design Build Emergency Project involved the removal of an existing precast box culvert and construction of a cast in place box culvert along Avenida De La Playa in La Jolla. The project also removed an existing nutrient separating baffle box and replaced it with a trash capture device, removed and replaced existing surface improvements along Avenida De La Playa due to damage that was caused by a failure of the existing precast box culvert.

City of San Diego, Streamview Drive Improvements Phase 2, San Diego, CA: The project involves the design of a roadway diet along Streamview Drive. The project will narrow the existing roadway and install five roundabouts in order to reduce excessive speeds, will provide class II bike lanes, design of new ADA facilities, replace over 130 driveways, replace/upgrade bus stops, install water quality facilities including trash capture devices, replace and install new storm drainage, water, and sewer facilities, and relocate dry utilities. Nick is serving as the Project Manager for this project and is responsible for overseeing the contract, development of PS&E, coordination with the City of San Diego, project scheduling, budget control, and construction support.

South Mission Beach Storm Drain and Green Infrastructure, San Diego, CA:

Nick was Project Manager of this design project, which evaluated the upsizing, realignment, and replacement of the existing storm drain systems that feed into Mariners Basin and the Mission Bay Jetty, as well as new storm drain systems to connect existing low points throughout South Mission Beach and implementation of water quality BMPs.

West Mission Bay Drive Bridge Replacement, San Diego, CA: Project Engineer for the Civil Design Team and was responsible for the development of the PS&E, preparation of the Design Standard Deviation Document (DSDD), and coordination with various agencies and stakeholders impacted by the project. The project involved the removal of the existing W. Mission Bay Drive Bridge and design of two new bridges across the San Diego River between I- 8 and SeaWorld, to accommodate future traffic volumes and increase access for pedestrians and bicyclists in the area. The design also included the widening of the I- 8 WB Exit Ramp and W. Mission Bay Drive/Sports Arena Blvd.; design of Class I Shared Use Paths; ADA design; design of water, sewer, and drainage facilities; development of bioretention basins; traffic signing and striping; traffic signal modifications; staged construction development; and hydraulic analysis of the San Diego River.

EXPERIENCE
13 Years

EDUCATION
BS, Civil Engineering,
San Diego State University

REGISTRATION/

CERTIFICATION
Professional Engineer (PE), CA
No. 83491

PROFESSIONAL

AFFILIATIONS
American Society of Civil
Engineers (ASCE)
American Public Works
Association (APWA)
American Public Works
Association (APWA)
Transportation Committee Chair
and Past Treasurer
08/12/2025
C7
197 of 237
* Not counted towards page count.

A-12
Carson Edgington PE
Civil
Carson Edgington is a Principal at RICK’s San Diego office. He manages a design team of engineers, designers, and drafters for an array of land development and public works projects including grading, surface improvements, transportation, water quality projects, flood control facilities, and sub-surface utilities (water/wastewater). Carson has extensive experience in preparing grading, drainage, and alignment studies, as well as final engineering documents. He has also worked closely with local agencies throughout the counties of San Diego and Riverside to process and facilitate plan approvals.

PROJECT EXPERIENCE
County of San Diego, Mapleview Street Biofiltration and Channel Restoration Project, San Diego, CA: Chris served as the Engineer of Work to develop a PER and followed up with PS&E development for the Mapleview Street Biofiltration and Channel Restoration Project in Lakeside Community. This project installed approximately 4,400 square feet of vegetated stormwater BMPs, approximately 550 linear feet of stormwater conveyance channel improvements, and approximately 2,500 linear feet of new sidewalk, with 6 pedestrian ramps. This project is a multiple awards winner in 2024 including awards from CMAA, APWA, and CASQA.

County of San Diego, Sweetwater Lane Park Trash Capture Project, San Diego, CA: Carson served as the Engineer of Work to develop a PER and followed up with PS&E development for the Sweetwater Lane Park Trash Capture Project in the Spring Valley Community. As part of this project, a sub-surface trash capture device was installed beneath the parking lot of Sweetwater Lane Community Park. The device was designed to capture trash, debris, and sediment from a 274-acre drainage area upstream of the park. In 2023, the Sweetwater Lane Community Park Trash Capture Project was recognized as a “Project of the Year” by the San Diego/Imperial County Chapter of the American Public Works Association.

ADDITIONAL PROJECT EXPERIENCE:
[ San Marino Drive Green Streets and Trash Capture Project [ Los Coches Dry Weather Diversion Pilot Project
[ South Mission Road (Northern Segment) Green Street Projects 1 & 2 [ Rainbow Green Streets Project
[ Goldentop Road Modular Wetland and Trash Capture Project. [ Lakeside and Spring Valley Debris and Access Control Structures. [ Ruxton Avenue Channel Conversion

EXPERIENCE
29 Years

EDUCATION
BS, General Engineering,
Idaho State University

REGISTRATION/

CERTIFICATION
Professional Engineer (PE), CA
No. 76519

PROFESSIONAL

AFFILIATIONS
American Public Works
Association (APWA)
Society of American Military
Engineers (SAME)
08/12/2025
C7
198 of 237
* Not counted towards page count.

A-13
Olivia Lincoln PE
Civil
Olivia Lincoln is an Principal Project Engineer in the Public Works – Transportation Division at RICK. She has assisted in the oversight in the design and PS&E for various public and private infrastructure improvement projects using County and other local agency standards. Her design experience includes complete streets and green streets principles; shared-use components such as paths, bicycle lanes, and pedestrian walkways; storm drain network improvements; stormwater management; trash capture devices, water-quality analysis; and BMPs to treat and infiltrate surface runoff .

PROJECT EXPERIENCE
County of San Diego, Smuggler’s Gulch Improvement Project, San Diego, CA:

Olivia as the Civil Project Manager is currently supporting the County with development of PS&E for the Smuggler’s Gulch Improvement project located in the Tijuana River Valley Regional Park. This project addresses stormwater, sediment and trash issues in Smuggler’s Gulch through the addition of a sedimentation basin, replacement of an undersized road culvert, and the addition of trash capture devices.

County of San Diego, Woodside Avenue Sidewalk Improvement Project, San Diego, CA: Olivia serves at the project engineer and lead designer for this $8.1M project located in the community of Lakeside. Improvements include integrated curb extensions, bike lanes, sidewalks and curb ramps, transit facilities, standardized driveways, dispersion areas and biofiltration facilities. RICK has supported this project through traffic, lighting, and stormwater studies, conceptual design, utility and ROW coordination, and PS&E design. The project corridor is over a mile long and densely packed with 8+ utility agencies and 65+ commercial and residential properties. Project challenges include utility coordination and careful consideration to balancing local design standards, continuity with existing features, and public feedback.

County of San Diego, Rancho Santa Fe Roundabouts Project, San Diego, CA: Olivia serves as the project engineer for this project located in the community of Rancho Santa Fe which proposes three roundabouts along Paseo Delicias at the intersections of Via De La Valle, El Montevideo, and El Camino Del Norte. Torus software was used to confirm roundabout geometrics, including fastest path, inscribed circle diameters and central island diameters. The project seeks to reduce impact to right-of-way, environmentally sensitive areas, historic properties, as well as existing pedestrian, bicyclist, transit, and equestrian routes. The project includes preliminary, 70%, 100% and Final design.

County of San Diego, Ashwood Street Corridor Improvements, San Diego, CA:

The project proposes to improve 1.2 miles of roadway of Ashwood St from Mapleview St to Willow Rd in the County of San Diego. Proposed improvements will enhance ingress and egress of El Capitan High School and provide a signalized intersection at Willow Rd and Ashwood St. The project will implement various water quality features along the corridor. Olivia’s responsibilities include oversight and design related to the development of PS&E for improvements totaling $3.6M in construction costs, including BMP and storm drain systems, erosion control, traffic signal modification, traffic control, and an on-site wastewater treatment system.

ADDITIONAL PROJECT EXPERIENCE:
[ County of San Diego, Pamo Road Bridge over Santa Ysabel Creek, San Diego, CA

EXPERIENCE
10 Years

EDUCATION
MS, Civil and Environmental
Engineering,
Northeastern University
BS, Environmental Engineering,
University of Vermont

REGISTRATION/

CERTIFICATION
Professional Engineer (PE), CA
No. 88643

PROFESSIONAL

AFFILIATIONS
American Society of Civil
Engineers (ASCE)
Younger Member Forum (YMF)
Member Women in
Transportation Seminar (WTS)
08/12/2025
C7
199 of 237
* Not counted towards page count.

A-14
Shavger Rekani PE, CFM
Civil
Shavger Rekani has experience in a variety of water resources projects, including environmental compliance, stormwater compliance, hydrologic and hydraulic analysis, storm drain and drainage design, flood plain studies, hydromodification management, and waterquality treatment facilities. He has prepared and processed projects through various municipal agencies throughout California and national resource agencies. He is very familiar with drainage design requirements, including variable hydrologic and hydraulic criteria throughout California; and has prepared studies and designs ranging from the conceptual phase to final engineering, including providing water resources CEQA support, preparing and processing CLOMRs and LOMRs.

PROJECT EXPERIENCE
County of San Diego, Preliminary Engineering Reports, San Diego, CA: Shavger is currently serving as the Principal-in-charge/Project Manager for development of the following preliminary engineering reports (several of these propose trash capture devices) using the County of San Diego template:
[ Magnolia Avenue Green Streets Project
[ South Mission Road (South) Green Street Project
[ Osborne Street Green Street Project
[ Fairway Drive Green Street Project
[ Top Ten Green Streets Review – Initial Analysis
[ Guajome Park BMP and Sports Park Initial Analysis
City of San Diego, Various Emergency Storm Drain Projects, San Diego, CA:

Shavger is the Project Manager/Engineer of Work responsible for managing the project as a subconsultant, preparing the plan package, drainage study, and meeting and coordinating with the various team members and client. The projects include the removal or abandonment of the failed storm drain, typically CMP, installation of the new storm drain system and associated upstream inlet(s), slope/scour repair, and slope revegetation. The services provided by RICK on these projects include field surveying, hydrologic and hydraulic analysis (H&H analysis), storm drain with outlet energy dissipation design, grading design for the eroded side slopes, providing surface improvements (curb ramps, pavement replacement, sidewalk, etc.), revegetation, and mapping services (easement verification, plat and legals).

ADDITIONAL PROJECT EXPERIENCE:
[ WRCOG, Offsite Alternative Compliance Program Development Support, Riverside, CA
[ San Diego Unified Port District, Offsite Alternative Compliance Program Development, San Diego, CA
[ City of San Diego, Sunset Cliffs Natural Drainage Improvements, San Diego [ City of San Diego, Maple Canyon Restoration Phase 1 and 2, San Diego, CA

EXPERIENCE
13 Years

EDUCATION
MS, Civil Engineering,
San Diego State University
BS, Civil Engineering,
San Diego State University

REGISTRATION/

CERTIFICATION
Professional Engineer (PE), CA
No. 90893
Certified Floodplain Manager,
CA, No. US-19-11088

PROFESSIONAL

AFFILIATIONS
Building Industry Association
(BIA) - Stormwater Task Force
American Public Works
Association (APWA)
California Stormwater Quality
Association (CASQA)
08/12/2025
C7
200 of 237
* Not counted towards page count.

A-15
Geoffrey Dye PLS
Associate Principal
Geoffrey (Geff) Dye is an Associate Principal at RICK. A third-generation surveyor with more than 39 years of experience providing services for public and private projects.

His experience includes, land title surveys, topographic & design surveys, GPS surveys, site plans, aerial mapping control, legal description preparation, monument preservation, settlement monitoring, boundaries, utility systems mapping, and right- of-way and easement determinations. Geff has managed construction staking for roadways, utilities, highways, bridges, parks, boundary and topographic surveys, and other infrastructure improvements. He is also responsible for scheduling and coordinating field activities for survey crew throughout San Diego.

PROJECT EXPERIENCE
City of San Diego, As-Needed Land Surveying Services, San Diego, CA: Geff was the Field Project Manager for the current As-Needed Surveying Contract for the City of San Diego. He coordinates and manages daily activities for multiple on-going tasks orders including monument inventory, right-of-way surveys, aerial surveys, design surveys and construction staking projects.

ESA Secondary Connection, San Diego County, CA: Field supervisor for the Aerial Mapping and right of way surveying for the Padre Dam Water District’s ESA Secondary Connection Project as a sub-consultant to Black & Veatch.

Harrah’s Rincon Expansion Project, San Diego County, CA: Served as field supervisor performing detailed topographic site survey necessary for the site design for the Garden Tower renovation. The renovation included new spas, fire pits, a water feature, private room patios, landscape planters, decorative screen walls, security fencing, and drainage systems.

I-805 & Telegraph Canyon Road Interchange, Chula Vista, CA: Performed for the City of Chula Vista, served as Party Chief to start the project and supervised the completion. This project involved layout based on Caltrans procedures. The scope of work included widening the ramps, as well as a portion of Telegraph Canyon Road.

McMillin’s Lomas Verdes, Chula Vista, CA: Served as Field Supervisor for the construction of Phase 2 and Phase 3. Geoffrey also supervised the construction staking of the pedestrian bridge at the intersection of East Palomar and La Media.

Otay Valley Regional Park, Staging Areas, San Diego, CA: Served as Field Supervisor for the topographic mapping of six separate staging areas with the proposed Otay Valley Regional Park trail system. Field tasks also included establishing horizontal and vertical survey control and existing right-of-way and property boundaries adjacent to the proposed staging area sites.

Padre Dam Water District, San Diego County, CA: Field supervisor for on-call surveying contract for the Padre Dam Water District. Work to date has included field design surveys and various construction-staking tasks for several small facilities improvement projects.

Record of Survey Monumentation, Chula Vista, CA: Served as Field Supervisor for the preparation and processing of several records of survey monumentation for various residential communities within the City of Chula Vista. Work also included setting horizontal and vertical control based on City’s Geodetic Control Network and Benchmark Book. Also included was filing the records of survey with the County of San Diego.

EXPERIENCE
39 Years

REGISTRATION/

CERTIFICATION
Professional Land Surveyor
(PLS), CA No. 8150

PROFESSIONAL

AFFILIATIONS
California Land Surveyors
Association (CLSA)
AGC San Diego - Associated
General Contractors of America
08/12/2025
C7
201 of 237
* Not counted towards page count.

A-16
Gabriel Mercado
Utility Potholing
Gabriel Mercado has been with AirX since 2013, working from the ground up as a laborer and potholer to potholing project manager, locating supervisor and now operations manager. Gabriel supervises and coordinates scheduling for multiple crews to ensure timely completion of projects.

PROJECT EXPERIENCE
SDG&E Line 1600 Couser Canyon North Hydrotest, Valley Center, CA: Gabriel provided project management, pothole layout and utility locating on the SDG&E Line 1600 Rice Canyon Hydrotest project, a project where AirX potholed wrinkles and bends in the 16-inch diameter gas transmission line to provide depths and soil conditions at those locations. Prior to a hydrotest, to improve piggability and the integrity of the line, the project looks to replace wrinkle bends, short radius elbows, and pressure control fittings at these sites. Coordination with private property owners, remote work sites away from roadways, and heavy rainfall conditions proved challenging on this project. A total of 22 potholes and 3 trenches were excavated, and 1 manhole was dipped on the project.

SDG&E C451AS Cutover Load to C519, Escondido, CA: Gabriel provided locating supervision and QA/QC on a SDGE electrical distribution project. Utility locating and markout was completed on approximately 1/2 mile of Oak Hill Drive in Escondido, with three smaller ~ 150-foot sections added later on at each end of the alignment.

One Fiber Verizon As-Needed Potholing (North County, San Diego, CA: Gabriel provided project management for the One Fiber Verizon project with Henkels & McCoy, supervising 1-4 vacuum excavation crews on a daily basis as they potholed utilities ahead of fiber optic installations at various locations throughout North County, San Diego. AirX vacuum trucks were also hooked up to rocksaw attachments and put on “creep mode” so that shallow mini-trenches could be dug for the installation. This fast- moving project lasted for 16 months.

Sycamore to Peñasquitos (SX to PQ) 230kV Line Project, NV5 (Cities of San Diego and Poway, CA: Gabriel provided labor, traffic control-, field safety-, and pothole-supervision on an approximately 16.7-mile proposed transmission line in San Diego as part of the Sycamore to Peñasquitos (SX to PQ) 230Kv Line Project. AirX was tasked to investigate utilities and find obstructions on proposed vault locations along the proposed alignment. The project consisted of two parts (East and West) and totaled 746 potholes on an extremely accelerated schedule and required night and day work.

EXPERIENCE
11 Years
08/12/2025
C7
202 of 237
* Not counted towards page count.

A-17
Mikala Randich
GIS
Mikala is a GIS Asset Manager at RICK’s San Diego office, bringing her municipal, federal GIS, and asset management expertise to the company; she specializes in integrating spatial data and asset management software systems to efficiently analyze a range of assets, including stormwater infrastructure, roads, right-of-way, sidewalks, and additional campus infrastructure.

While creating successful end-to-end products for clients, Mikala utilizes efficient field data collection, technological data integrations, extensive support documentation, and seamless product delivery. Using ArcGIS Pro, Esri’s ArcGIS suite, and individual client unique asset management programs, Mikala supports clients with asset management planning and optimization through spatial analysis. She is collaborating with RICK’s Water Resources team to develop maintenance plan routes for efficient inspection of local pipelines, which will optimize public works vehicle routing and use inspection data to communicate maintenance recommendations via an interactive dashboard.

PROJECT EXPERIENCE
County of San Diego, Roadmap to Update MS4 GIS Inventory San Diego, CA:

Mikala is currently supporting the County in developing a GIS database schema for MS4 stormwater infrastructure, conducting plan document research in unincorporated areas, updating the GIS inventory, and documenting a detailed roadmap process to ensure an iterative and replicable process for the client for years to come.

City of San Diego, As-Needed GIS Support, San Diego, CA: Mikala is currently supporting the City by managing a task order to provide as-needed GIS services.

Tasks performed under this include, as-built digitization, ownership research, inventory grouping to support inspections and maintenance, and updates to existing street sweeping GIS data to make it usable for navigation.

Stormwater Maintenance and Budget Plan, Town of Folly Beach, Charleston County, SC*: Mikala was a project manager to develop a recommendation plan to reduce flooding and improve drainage for a problematic flooding area for a local municipality. A combination of field work (asset location verification and collection of key attribution), GIS mapping, and asset condition modeling was used to determine two scenario plans: an optimization of asset condition scenario, and a limited budget scenario. Effective management and communication regarding technical requirements, in-field edits, and optimized scheduling to meet the 10-week deadline were necessary to make this project a success.

Correcting County Stormwater Infrastructure Datasets, Charleston County, SC*: Mikala was the project responsible for overhauling a archive of decades-old stormwater GPS data into a complete and usable GIS dataset. Mikala utilized ESRI’s enterprise versioned geodatabases, ArcGIS Online, and Collector in conjunction with Cartegraph asset management software to capture and store the stormwater asset data. In combining the spatial and editing strength of ESRI’s suite of products with asset management principles in the Public Works environment, This initiative was recognized by APWA and was accepted as a speaker presentation at the PWX (Public Works Expo) conference.

EXPERIENCE
7 Years

EDUCATION
BS, Environmental Sciences,
Florida State University

REGISTRATION/

CERTIFICATION
Deploying and Maintaining a
Multiuser Geodatabase, ESRI,
2019

PROFESSIONAL

AFFILIATIONS
Director, American Public
Works Association (APWA),
South Carolina Chapter
Member, GIS Public
Lowcountry Users Group

* Indicates work with
previous employer.
08/12/2025
C7
203 of 237
* Not counted towards page count.

A-18
Mario Terrazas
GIS
Mario Terrazas is an Geographic Information System (GIS) Project Manager and 3D modeling specialist working in the GIS Division at RICK’s San Diego office. With a strong background in CAD design and graphic design at California Polytechnic University, Pomona, Mario is experienced in computer modeling and animation, AutoCAD, Microstation, 3-D Studio and other graphic design and mapping products.

He helps lead the company’s application of various GIS processes on projects, providing innovative GIS solutions, 3-D modeling of existing and proposed site conditions, computer photo simulations, site visualizations, slope analysis and intervisibility studies.

PROJECT EXPERIENCE
California Mandated Trash Cleanup Drainage Master Plan, City of Vista, CA:

Mario was the primary GIS Analyst that supported the City develop a planning level Trash Order Drainage Master Plan to identify multibenefit structural strategies that the City can implement to meet the State Trash Amendment requirements. This study included: i) compilation of high-resolution geospatial data for the PLU storm drain system within the City’s sphere of influence. This included development of a comprehensive Geographic Information System inventory of structure and conveyance features within the study area; ii) estimate flow conveyance capacity of the existing drainage systems draining PLU areas. Drainage assessment includes hydrologic and hydraulic (H&H) analysis performed to establish the level of service of the storm drain system; and iii) identification of regional and subregional structural strategies that can be used to meet the remaining trash load reduction requirements while also providing additional benefits such as flood resiliency and water quality improvements.

City of San Diego, Chollas Watershed Master Plan, San Diego, CA: Mario worked to build a GIS-centric model of the Chollas Creek study area assessing the drainage and water quality infrastructure best practices necessary to meet storm water quality regulations and flood control services requirements. Mario’s responsibilities include managing all GIS efforts including the development of the GIS geodatabase design, inventorying existing conditions storm drain, creating innovative automated processes to bridge GIS and H&H model applications, and mapping efforts. The processed data was designed to be compatible and seamlessly integrate with City’s internal GIS data structure in order to provide the City with a method to allocate resources in order to lift the study area flood control levels of service to adopted City Standards.

City of Carlsbad, GIS-Based Master Drainage Plan, Carlsbad, CA: Mario assisted in the development and day to day maintenance of a custom ArcInfo GIS application to automate the Master Drainage Plan data entry and design process. The program automated the process of basin and facility data entry, land use and soil type assignments, and calculations of drainage basin areas, flowline lengths, and area runoff coefficients. The program also formatted this data in a format, which allowed direct importation into the Advanced Engineering Software (AES) Storm Information Management System (SIMS) design module. Mario worked hand in hand with Water Resources Engineers to trouble shoot the automation process of CADD to GIS to AES and back to GIS. After drainage design was complete the data was imported from AES SIMS into ArcView, allowing an interactive query, display, analysis, and future modifications by the City of Carlsbad.

EXPERIENCE
24 Years

EDUCATION
Coursework in Computer
Graphic and CAD Design,
California State Polytechnic
University, Pomona
Coursework in Visual Basic
Programming Language,
MiraCosta College, Oceanside
Coursework in Web Design,
MiraCosta College, Oceanside

ESRI COURSEWORK
Geometric Network Design
ArcGIS Server Map Tuning
Geocoding with ArcGIS
Geoprocessing with
ArcGIS 2005-2017 ESRI,
UCConstruction

PROFESSIONAL

AFFILIATIONS
SoCal Urban and Regional
Information Systems
Association (URISA)
San Diego Regional GIS
Council
Geospatial San Diego
08/12/2025
C7
204 of 237
* Not counted towards page count.

A-19
Ben Alonzo GISP
GIS
Ben is a GIS Programmer at RICK. He has extensive experience in the field with over a decade of experience performing increasingly complex tasks to support a range of GIS and programming projects. Ben is highly adept with ESRI GIS Desktop and Server software, and leveraging programming/scripting to improve project efficiency.

He frequently provides cartographic, data management and application development support to internal Project Managers or external clients while incorporating complex geographic analysis to meet project requirements. Beyond core GIS skills, he brings programming expertise in Python, C#, JavaScript, and SQL to automate processes, augment analysis capability, manage databases, and provide innovative interactive products to clients. This unique skill set has been utilized on numerous DMPs, involving the creation of several GIS tools and scripts to enhance the workflow process and final deliverables.

PROJECT EXPERIENCE
California Mandated Trash Cleanup Drainage Master Plan, City of Vista, CA:

Mario was the GIS Programmer that supported the City develop a planning level Trash Order Drainage Master Plan to identify multibenefit structural strategies that the City can implement to meet the State Trash Amendment requirements. This study included:
i) compilation of high-resolution geospatial data for the PLU storm drain system within the City’s sphere of influence. This included development of a comprehensive Geographic Information System inventory of structure and conveyance features within the study area; ii) estimate flow conveyance capacity of the existing drainage systems draining PLU areas. Drainage assessment includes hydrologic and hydraulic (H&H) analysis performed to establish the level of service of the storm drain system; and iii) identification of regional and subregional structural strategies that can be used to meet the remaining trash load reduction requirements while also providing additional benefits such as flood resiliency and water quality improvements.

City of El Cajon, GIS Programmer/Analyst, Citywide Master Drainage Plan, El Cajon, CA: Ben assisted with the existing citywide storm drain system; in support of the development of a Master Drainage Plan. Data sources included as-built plans, City survey records, field data, and GPS collected storm drain information. The inventory was stored in an ArcSDE geodatabase allowing multiple simultaneous updates to the system in a controlled and set environment. He utilized several custom ArcInfo, ArcGIS and ArcMap applications to automate the Master Drainage Plan data entry, design and exhibit process. He created interactive Web App with existing conditions and study results with 20 GIS layers, and performed in ArcSDE geodatabase maintenance and processed data updates. He produced GIS exhibits and provided deliverables.

GIS Programmer/Analyst, Master Drainage Plans (MDPs) for San Diego County Special Drainage Areas (SDAs) 1 & 8, Spring Valley & Ramona, CA: In his role, Ben worked with members of the Water Resources Division to create a detailed storm drain inventory for approximately 130 square-miles of the County of San Diego.

Created interactive Web App with SDA-3, SDA-7, 10 basins and storm drain data and produced GIS exhibits and provided deliverables. Data sources included as-built plans, County survey records, field data, and GPS collected storm drain information.

EXPERIENCE
35 Years

EDUCATION
MS, GIS, Penn State University
BA, Geography, Utah State
University

REGISTRATION/

CERTIFICATION
GIS Professional Certificate,
No. 99321

PROFESSIONAL

AFFILIATIONS
Urban and Regional Information
Systems Association (URISA)
Association of American
Geographers (AAG)
08/12/2025
C7
205 of 237
20 City of Vista | Trash Capture BMP Device Analysis CIP 8343 / 5620 Friars Road, San Diego, CA 92110
/ (619) 291-0707
/ WWW.RICKENGINEERING.COM
08/12/2025
C7
206 of 237
1 City of Vista | Trash Capture BMP Device Analysis CIP 8343

FEE SCHEDULE FOR

TRASH CAPTURE BMP
DEVICE ANAL YSIS, CIP 8343
C over Letter
Hour ly Billing Rates
a . Rick Engineering Company
b . D-Max Engineering, Inc.
c . AirX Utility Surveyors
C ost-Loaded Work Plan
May 22, 2025
5620 Friars Road, San Diego, CA 92110
WWW.RICKENGINEERING.COM
(619) 291-0707
08/12/2025
C7
207 of 237
1 City of Vista | Trash Capture BMP Device Analysis CIP 8343 Cover Letter
May 22, 2025
City of Vista
Erin Adams, Administrative Programs Manager
200 Civic Center Drive
Vista, CA 92084
RE: Proposal to Provide Trash Capture BMP Device Analysis, CIP 8343 Dear Selection Committee,
Rick Engineering Company (RICK) has developed a Cost-Loaded Work Plan for the development of the Trash Capture BMP Device Analysis. The technical and professional services associated with the work are described in the proposal presented as a separate file.

Hourly Billing Rates were included for RICK and its subconsultant partners, D-Max Engineering, Inc. and AirX Utility Surveyors. The cost-loaded Work Plan includes a breakdown of labor hours and proposed cost by employee billing classification, together with the cost of non-labor and subconsultant services. The labor breakdown is based on the listing of work tasks correlated to the Scope of Services described in the proposal.

Subconsultant costs are allocated on a per-task basis, but are not broken out by each staff classification.

We are excited about this opportunity to collaborate with you and the City of Vista team. If you have any questions or need additional information, please contact Venkat Gummadi at (619) 204-5979 or vgummadi@ rickengineering.com.

Sincerely,
Rick Engineering Company

Venkat Gummadi, PE, QSP/D, CPESC
Project Manager
(619) 291-0707
rickengineering.com
5620 Friars Road,
San Diego, CA 92110

SAN DIEGO ORANGE RIVERSIDE SACRAMENTO SAN LUIS OBISPO SANTA CLARITA PHOENIX TUSCON LAS VEGAS DENVER 08/12/2025
C7
208 of 237
2 City of Vista | Trash Capture BMP Device Analysis CIP 8343 Hourly Billing Rates
BILLING. RICK will submit monthly
invoices with a progress report. The
progress report will include the reporting
period, work completed in the reporting
period, work anticipated in the upcoming
reporting period, critical path items/
decisions, and budget and schedule
update.

REIMBURSABLE AND
SUBCONSULTANT MARKUP.

Printing, reproduction, deliveries,
transportation, and other reimbursable
expenses will be billed at cost.

Subconsultant markup is listed at 4%
of total price to cover overhead and
administration.

RICK

PERSONNEL LABOR CATEGORY HOURLY RATE
Venkat Gummadi
Brendan Hastie
Carson Edgington
Principal $300
Geff Dye
Nick Dorner
Shavger Rekani
Associate Principal $280
Associate/Manager $260
Andrew Thies
Olivia Lincoln Principal Project Manager $245
Chris Mattox
Eric Hengesbaugh
Laura Henry
Associate Project Manager $220
Mariah Rodriguez Assistant Project Manager $200
Senior Technical Manager $200
Principal Designer $175
Associate Designer $160
Assistant Designer $145
Mikala Randich GIS Asset Manager $200
Ben Alonzo
Mario Terrazas
GIS Project Manager/
Programmer $180
Party Chief (Prevailing Wage) $225
Chainman (Prevailing Wage) $195
Survey Analyst $200
Project Administrator $90
Applicable to City of Vista Trash Capture BMP Device Analysis – Effective till December 31, 2026
08/12/2025
C7
209 of 237
3 City of Vista | Trash Capture BMP Device Analysis CIP 8343 OTHER CHARGES. Subcontracted services,
such as sub consultants, outside testing, drilling,
and surveyors, will be charged at cost plus 4%.

Other project-specific costs, such as rentals,
expendable or special supplies, special project
insurance, permits and licenses, shipping,
subsistence, tolls and parking, outside copying/
printing, etc., will be charged at cost. Mileage
will not be charged. Meals, lodging, and travel
expenses, when pre-approved by the City, will be
charged at cost or at standard per diem rates, as
applicable.

Client will be responsible for any applicable taxes
in addition to the fees.

Field and hourly services will be charged portal to portal from our office, with a two-hour minimum.

Appearance as expert witnesses at court trials, mediation, arbitration hearings and depositions will be charged at $250/ hour. Time spent preparing for such appearances will be charged at the above standard hourly rates.
1This fee schedule is proposed for work in 2025 and 2026. Updates to the fee schedule for work in future years will be proposed as applicable and will be based on the CPI increase from the preceding year.

D-MAX
July 1, 2025 – December 31, 2026

LABOR CLASSIFICATION HOURLY RATE
Word Processor/Admin $95
Drafter $108
Technician $92
Senior Technician $107
Staff Scientist I $117
Staff Scientist II $132
Staff Scientist III $143
Assistant Project Scientist $154
Project Scientist $172
Senior Scientist $195
Principal Scientist $226
Staff Engineer I $135
Staff Engineer II $150
Assistant Project Engineer $175
Project Engineer $195
Senior Engineer $215
Principal Engineer $240
08/12/2025
C7
210 of 237
4 City of Vista | Trash Capture BMP Device Analysis CIP 8343 RICK Engineering Attn: Venkat Gummadi, [email protected] City of Vista Trash Capture
To be determined
Total Number of Estimated Potholes: 0
Project Management & Report Preparation
Project Management (QAQC/USA Mark-Out / Standby Coord. / Pothole Layout) No.: 0 hours @ $165 per hour= $0 Report drafting No.: 0 hours @ $125 per hour= $0
Prevailing Wage Processing (Apprentice Reporting and Certified Payroll) No.: 0 hours @ $125 per hour= $0 Specialty Training No.: 0 hours @ $140 per hour= $0
Sub-total $0
Potholing ~ 8 Hour Onsite Minimum (Portal-to-Portal)
Potholing Daily Rate (2-man crew) No.: 0 @ $4,000 per day= $0 ^^includes shoulder closure or narrow lane closure, backfill and AC cold patch Third Laborer for Hot Patch Cap No.: 0 @ $1,600 per day= $0 Slurry Delivery by third party - Initial Delivery, Prevailing Rate No.: 0 @ $3,500 each= $0 Slurry Delivery by third party - Subsequent Deliveries, Prevailing Rate No.: 0 @ $900 each= $0 Mobilization (portal-to-portal) No.: 0 @ $400 per hour= $0 Potholing 1-Man / 1-Vacuum Truck Hourly Rate No.: 0 @ $275 per hour= $0 Manhole Dips No.: 0 @ $100 each= $0
Haulage and Dump Fee (Non-Hazardous only) No.: 0 @ $350 per load= $0 Sub-total $0
Wet & Dry Utility Locating (4 hour onsite minimum per man) Locating - 1 Man & Equipment (Elec, Mag, Sonic, GPR) No.: 0 hours @ $205 per man hour= $0 Locating - CCTV Truck and 2 Crew No.: 0 hours @ $410 per man hour= $0 Sub-total $0
Traffic Control
Traffic Control/ROW plans - 11"X17" No.: 0 @ $175 p/sheet= $0 Permit processing No.: 0 hours @ $120 per hour= $0
Minimal Traffic Control Equipment (w/CCTV only) No.: 0 each @ $150 each= $0 Bike Lane, Shoulder or Narrow Lane Closure (Excludes Arrow Board) No.: 0 each @ $350 each= $0 Small Intersections/Standard Lane Closures (Up to 500' + tapers) No.: 0 each @ $550 each= $0 Large Intersections/Multiple Lane Closures No.: 0 each @ $750 each= $0 Additional Arrow Board No.: 0 days @ $150 per day= $0
Night Work Premium No.: 0 nights @ $350 per night= $0
No. Flagmen 0 $145 per hour for 0 hours= $0
$0
Concrete and Asphalt Patching
Aquaphalt Permanent Patch w/Saw Cut No.: 0 @ $150 each= $0 AC Hot Mix Patch w/Saw Cut 2'x2' T-Cut (Crew of 2) No.: 0 @ $3,500 per day= $0 AC Hot Mix Patch Grind and Overlay (Crew of 4) No.: 0 @ $6,500 per day= $0 Coring - 12" Diameter No.: 0 @ $130 each= $0
Sidewalk Panel Replacement No.: 0 $0
Sub-total $0
Estimate Total: $0.00
XBD2025-340 City of Vista Trash Capture - Prevailing Wage Rates - RICK Eng AL

Call for Quote
Sub-total
Certified Flagman / Addt'l Laborer
AIRX Utility Surveyors, Inc.

Pricing on this document is valid for 90 days from the date above.

PREVAILING WAGE RATE SHEET
May 19, 2025
Project Location:

Project Name:

Prepared For:

Page 1 of 2 ends