ACTION: Adopted City Council Resolution No. 2026-87, authorizing joint application to participation in the Homekey+ P
rogram. Vote: 5-0.
____________________________
Clerk/Secretary
Department: City Manager’s Office Item No: C11
Prepared by: Jonathan Lung, Housing & Homeless Svcs Div. Mgr Meeting Date: May 26, 2026 Approved by:
Imelda Huerta, Assistant City Manager
John Conley, City Manager Agenda Location:
Consent
Calendar
SUBJE
CT: RESOLUTION AUTHORIZING AN APPLICATION FOR HOMEKEY+ FUNDING RECOM
MENDATION: Adopt City Council Resolution No. 2026- , authorizing joint application to participation in the Homekey+ Program.
CORREL
ATION TO CITY COUNCIL GOALS: Homelessness & Housing.
PRIO
R ACTION: On February 24, 2026, adopted City Council Resolution No. 2026-31, authorizing joint application to participation in the Homekey+ program; dopoted City Counil Resolution No. 2026-32, approving a Purchase and Sale Agreement for 952-958 Postal Way, Vista, CA 92083; adopted City Council Resolution No. 2026-33, approving a Buyer-Broker Representation Agreement with Jones Lang LaSalle Americas, Inc. for services related to the acquisition of 952-958 Postal Way; and adopted City Council Resolution No. 2026-34 amending the operating budget for Fiscal Years 2025/26 and 2026/27 (Vote: 4-0, O’Donnell Absent).
On Augus
t 26, 2025, directed staff to schedule a Closed Session Meeting to discuss potential real estate acquisition for Homekey+ projects (Vote: 5-0).
STAT
EMENT ON THE SUBJECT: The Homekey+ program, administered by the California Department of Housing and Community Development (HCD), provides competitive grant funding to local jurisdictions for the acquisition and development of housing serving people experiencing homelessness, particularly those requiring behavioral health supports.
On Augus
t 7, 2025, HCD released an amendment to the Notice of Funding Availability (NOFA) for Homekey+ to continue accepting application on a continuous over-the-counter basis until all funds are exhausted. The program provides funding for capital acquisition and development costs, with award amounts based on eligible project costs and local match contributions.
In par
tnership with nonprofit housing developer DignityMoves and nonprofit Transitional Age Youth (TAY) residential services provider Casa de Amparo (collectively, the “Partners”), staff is preparing an application to acquire the property at 952-958 Postal Way for use as a TAY Permanent Supportive Housing project to house 35 TAY exiting homelessness.
The proper
ty to be acquired is a recent conversion of two commercial offices structures to 36 one- bedroom apartments, including four ADA units, ranging between 400 – 600 sqft. Other property details AGENDA
REPORT
CITY COUNCIL
COMMUNITY DEVELOPMENT COMMISSION
SUCCESSOR AGENCY
BUENA SANITATION DISTRICT
JOINT POWERS FINANCING AUTHORITY
05/26/2026
C11
MEETING DATE: May 26, 2026 PAGE 2
SUBJECT: APPROVING AN APPLICATION FOR HOMEKEY+ FUNDING AND RELATED
DOCUMENTS
and improvements include a total of 76 parking spaces (including 4 ADA spaces), fencing around the entire property, three sets of washers and dryers, new trash enclosure, new mailboxes, new roofs, new fire sprinkler and alarm systems, and new exterior cameras. The property’s building plans are attached as Exhibit 3.
O
n February 24, 2026, the City Council approved four resolutions, one of which authorized the joint application for Homekey+ funds with the City’s Partners with a total project cost of up to $16.5M. Since the adoption of that resolution, the City and its Partners have added a request for operating subsidies from Homekey+ funds at $1,400 per unit.
The t
otal proposed project cost, including site acquisition, rehabilitation, improvements, operating subsidy, and other related eligible project costs is now $18.42M. Approval of this item will adopt a resolution authorizing the joint application for Homekey+ funds with a total project cost of no more than $20M, which will replace the resolution adopted on February 24, 2026, identifying a total project cost of up to $16.5M .
All other aspects of this project as previously approved on February 24, 2026, would remain unchanged, including the City’s $2.2M appropriation to support this project.
F
ISCAL IMPACT: There is no direct fiscal impact with approval of this item.
EXHIBITS:
1. City Council Resolution No. 2026- , authorizing joint application to participation in the Homekey+ Program
2. City Council Resolution No. 2026-31, authorizing joint application to participation in the Homekey+ Program
3. Postal Way Building Plans
05/26/2026
C11
RE
SOLUTION NO. 2026-
A RESOLUTION OF THE CITY COUNCIL OF THE CHARTERED CITY OF
VISTA, CALIFORNIA, AUTHORIZING JOINT APPLICATION TO AND PARTICIPATION IN THE HOMEKEY+ PROGRAM
The City Council of the City of Vista does resolve as follows:
1. Findings. The City Council hereby finds and declares the following:
A. The Department of Housing and Community Development (“HCD”) has issued a Notice of Funding Availability, dated November 26, 2024 (“NOFA”), for the Homekey+ Program (“Homekey+” or “Program”). HCD has issued the NOFA for Homekey+ grant funds pursuant to Health and Safety Code Section 50675.1.3 (Assem. Bill No. 140 (2021-2022 Reg. Sess.), §
20.); Health and Safety Code Section 50675.1.5 (Assem. Bill No. 531 (2023-2024 Reg. Sess.); Section 14184.402 of the Welfare and Institutions Code; Section 5891.5 of the Welfare and Institutions Code; and Round 5 and 6 of the Homeless Housing, Assistance and Prevention (HHAP) grant program. (Assem. Bill No. 129 (Chapter 40, Statutes 2023) and Assem. Bill No. 166 (Chapter 48, Statutes 2024), respectively.
B. The City of Vista (“Applicant”) desires to jointly apply for Homekey+ grant funds with DignityMoves and Casa de Amparo, Therefore, Applicant is joining DignityMoves and Casa de Amparo in the submittal of an application for Homekey+ funds (“Application”) to HCD for review and consideration.
C. HCD is authorized to administer Homekey+ pursuant to the Multifamily Housing Program (Chapter 6.7 (commencing with Section 50675) of Part 2 of Division 31 of the Health and Safety Code. Homekey+ funding allocations are subject to the terms and conditions of the NOFA, the Application, the HCD-approved STD 213, Standard Agreement (“Standard Agreement”), and all other legal requirements of the Homekey+ Program.
2. Action.
A. The City of Vista is hereby authorized and directed to submit a joint application to HCD in response to the NOFA, and to jointly apply for Homekey+ grant funds in a total amount not to exceed $20,000,000.
B. If the application is approved, the City of Vista is hereby authorized and directed to enter into, execute, and deliver a Standard Agreement in a total amount not to exceed $20,000,000, any and all other documents required or deemed necessary or appropriate to secure the Homekey+ funds from HCD and to participate in the Homekey+ Program, and all amendments thereto (collectively, the “Homekey+ Documents”).
C. The City of Vista acknowledges and agrees that it shall be subject to the terms and conditions specified in the Standard Agreement, and that the NOFA and Application will be incorporated in the Standard Agreement by reference and made a part thereof. Any and all activities, expenditures, information, and timelines represented in the application are enforceable through the Standard Agreement. Funds are to be used for the allowable expenditures and activities identified in the Standard Agreement. 05/26/2026
C11
EXHIBIT 1
RESOLUTION NO. 2026-
CITY COUNCIL OF THE CHARTERED CITY OF VISTA
PAGE 2
D. The City Manager is authorized to execute the application and all Homekey+ documents associated with the application on behalf of the City of Vista for participation in the Homekey+ Program.
3. Adoption. PASSED AND ADOPTED at a meeting of the City Council of the City of Vista held on May 26, 2026, by the following vote:
AYES:
NOES:
ABSTAIN:
APPROVED AS TO FORM:
WALTER CHUNG, CITY ATTORNEY
By:
APPROVED
Walter C. Chung
20260517133848
JOHN B. FRANKLIN, MAYOR
ATTEST:
KATHY VALDEZ, CITY CLERK
By:
05/26/2026
C11
RESOLUTION NO. 2026- 31
A RESOLUTION OF THE CITY COUNCIL OF THE CHARTERED CITY OF
VISTA, CALIFORNIA, AUTHORIZING JOINT APPLICATION TO AND PARTICIPATION IN THE HOMEKEY+ PROGRAM
The City Council of the City of Vista does resolve as follows:
1. Findings. The City Council hereby finds and declares the following :
A. The Department of Housing and Community Development (" HCD") has issued a Notice of Funding Availability , dated November 26, 2024 (" NOFA"), for the Homekey+ Program Homekey+" or " Program"). HCD has issued the NOFA for Homekey+ grant funds pursuant to Health and Safety Code Section 50675. 1. 3 ( Assem. Bill No. 140 ( 2021- 2022 Reg. Sess.), §
20.); Health and Safety Code Section 50675. 1. 5 ( Assem . Bill No. 531 ( 2023- 2024 Reg. Sess.); Section 14184. 402 of the Welfare and Institutions Code ; Section 5891. 5 of the Welfare and Institutions Code; and Round 5 and 6 of the Homeless Housing, Assistance and Prevention HHAP) grant program. ( Assem. Bill No. 129 ( Chapter 40 , Statutes 2023) and Assem. Bill No . 166 ( Chapter 48 , Statutes 2024), respectively.
B. The City of Vista (" City ") desires to jointly apply for Homekey+ grant funds with DignityMoves and Casa de Amparo, City is joining with DignityMoves and Casa de Amparo in the submittal of a joint application for Homekey+ funds (" Application") to HCD for review and consideration.
C. HCD is authorized to administer Homekey+ pursuant to the Multifamily Housing Program ( Chapter 6. 7 ( commencing with Section 50675) of Part 2 of Division 31 of the Health and Safety Code. Homekey+ funding allocations are subject to the terms and conditions of the NOFA, the Application , the HCD- approved STD 213 , Standard Agreement (" Standard Agreement "), and all other legal requirements of the Homekey+ Program .
2. Action.
A. The City of Vista is hereby authorized and directed to submit a joint Application to HCD in response to the NOFA, and to jointly apply for Homekey+ grant funds in a total amount not to exceed $ 16 , 500,000.
B. If the Application is approved , the City of Vista is hereby authorized and directed to enter into , execute , and deliver a Standard Agreement in a total amount not to exceed 16 , 500, 000, any and all other documents required or deemed necessary or appropriate to secure the Homekey+ funds from HCD and to participate in the Homekey+ Program , and all amendments thereto ( collectively , the " Homekey+ Documents ").
C. The City of Vista acknowledges and agrees that it shall be subject to the terms and conditions specified in the Standard Agreement, and that the NOFA and Application will be incorporated in the Standard Agreement by reference and made a part thereof. Any and all activities , expenditures , information , and timelines represented in the Application are enforceable through the Standard Agreement. Funds are to be used for the allowable expenditures and activities identified in the Standard Agreement. 05/26/2026
C11
EXHIBIT 2
RESOLUTION NO. 2026- 31
CITY COUNCIL OF THE CHARTERED CITY OF VISTA
PAGE2
D. The City Manager is authorized to execute the Application , the Homekey+ Documents , and any related documents, on behalf of the City of Vista for participation in the Homekey+ Program.
3. Adoption. PASSED AND ADOPTED at a meeting of the City Council of the City of Vista held on February 24 , 2026 , by the following vote :
AYES :
NOES :
ABSTAIN:
APPROVED
Walter C. Chung
20260218115734
Mayor Franklin, Contreras, Melendez, Fox (O'Donnell absent) None
None
05/26/2026
C11
Project Information
ASSESSOR'S PARCEL NO. 179-130-31
ADDRESS: 952 (BLDG A) & 958 (BLDG B) POSTAL WAY
VISTA, CA 92083
LOT AREA: 59,413 SF (1.36 AC)
BUILDING / LOT COVERAGE: 12,641 SF / 59413 SF = 21%
LANDSCAPE COVERAGE: 5% MINIMUM
15,358 SF / 59413 SF = 25.8%
LAND DISTURBANCE AREA: 2,235 SF
NEW IMPERVIOUS AREA: 0 SF
REPLACED IMPERVIOUS AREA: 1,835 SF
TYPE OF CONSTRUCTION: V-B
OCCUPANCY GROUP: R-2
PROPOSED USE: RESIDENTIAL APARTMENTS
FIRE SPRINKLERS: YES, NFPA 13R
FIRE ALARM: YES
STORIES: 2
FLOOR AREAS:
BUILDING 'A'
LEVEL 1 7,773 SF
LEVEL 2 7,661 SF
SUB-TOTAL 15,434 SF
BUILDING 'B'
LEVEL 1 4,868 SF
LEVEL 2 4,755 SF
SUB-TOTAL 9,622 SF
TOTAL: 25,056 SF
UNIT AREAS:
BUILDING 'A' (24 UNITS)
LEVEL 1 (12 UNITS) 6,438 SF
LEVEL 2 (12 UNITS) 5,949 SF
SUB-TOTAL 12,387 SF
BUILDING 'B' (12 UNITS)
LEVEL 1 (6 UNITS) 2,854 SF
LEVEL 2 (6 UNITS) 3,089 SF
SUB-TOTAL 5,944 SF
TOTAL: 18,331 SF
UNIT TYPES:
1-BEDROOM 35
STUDIO 1
TOTAL 36
Density
MAXIMUM ALLOWED DENSITY (30 D.U. PER ACRE):
30 x 1.36 ACRES: 40.8 UNITS
DENSITY PROVIDED: 36 UNITS
PROPOSED DEED-RESTRICTED LOW-INCOME UNITS (17%):
17% X 36 = 6.12: 7 UNITS
NUMBER OF CONCESSIONS ALLOWED: 2
NUMBER OF CONCESSIONS REQUESTED: 2
Parking
EXISTING PARKING:
STANDARD 71
ACCESSIBLE 6
TOTAL 77
REQUIRED PARKING:
ONE SPACE PER UNIT + 0.25 SPACES PER UNIT
36 UNITS 36
36 x 0.25 9
TOTAL 45
PROPOSED PARKING:
STANDARD 72
ACCESSIBLE (CBC TABLE 11B-208.2) 4
TOTAL 76
EV PARKING: 2
Project Summary
TWO EXISTING 2-STORY OFFICE BUILDINGS PERMITTED IN MARCH OF 1988 ARE BEING CONVERTED TO MULTI-FAMILY RESIDENTIAL APARTMENTS. A NEW TRASH ENCLOSURE AND PERIMETER FENCE ARE ALSO PROPOSED.
THE PROJECT IS NOT PUBLIC HOUSING AS DEFINED BY CBC CHAPTER 2.1 Code Statement
THE FOLLOWING CODES APPLY TO THE PROJECT:
2022 CALIFORNIA BUILDING CODE (CBC)
2022 CALIFORNIA MECHANICAL CODE (CMC)
2022 CALIFORNIA PLUMBING CODE (CPC)
2022 CALIFORNIA ELECTRICAL CODE (CEC)
2022 CALIFORNIA FIRE CODE (CFC)
2022 CALIFORNIA ENERGY CODE (CEnC)
2022 CALIFORNIA EXISTING BUILDING CODE (CXBC)
2022 CALIFORNIA GREEN BUILDING STANDARDS CODE (CALGREEN) Designations
LAND USE: MIXED USE (MU)
ZONING: SP1 DOWNTOWN VISTA SPECIFIC PLAN (SOUTH GATEWAY DISTRICT) COASTAL ZONE: NO
FIRE HAZARD SEVERITY ZONE: NO
WILDLAND URBAN INTERFACE ZONE: NO
FLOOD HAZARD AREA: NO
1 Building Code Allowable Area
CONSTRUCTION TYPE: V-B
OCCUPANCY GROUP: R-2
EXISTING USE: COMMERCIAL
PROPOSED USE: RESIDENTIAL
SPRINKLERS: YES, NFPA 13R
FIRE ALARM: YES
STANDPIPES: NO
STORIES: 2 (3 ALLOWED)
HEIGHT: 40' MAX.
ALLOWABLE AREA:
BASE ALLOWABLE AREA PER FLOOR (506.2): 7,000 SF x 2 FLOORS = 14,000 SF OPEN SPACE: 30' OR GREATER (SEE SITE PLAN)
AREA INCREASE FACTOR FOR FRONTAGE (506.3.3): 50% TO LESS 75% (SEE SITE PLAN) = 0.5 TOTAL ALLOWABLE INCREASE PER FLOOR: 7,000 x 1.5 = 10,500 SF TOTAL ALLOWABLE AREA: 10,500 x 2 FLOORS = 21,000 SF
Sheriff Department Notes
1. EACH TENANT 18 YEARS OF AGE AND OLDER MUST HAVE A MONTH-TO-MONTH LEASE OR LONGER.
2. STREET ADDRESS NUMBERS TO BE 12" MINIMUM SIZE IN A CONTRASTING COLOR FROM
THE BACKGROUND, MOUNTED ON THE BUILDING SO AS TO BE EASILY VISIBLE FROM THE STREET AND LIT AT NIGHT.
3. FRONT RESIDENTIAL ENTRY DOORS AND STORAGE ROOM DOORS SHALL BE STEEL- CLAD OR SOLID WOOD CONSTRUCTION. THERE SHALL BE NO GLASS WITHIN 40" OF DEADBOLTS INSTALLED AT THE FRONT DOOR. EACH EXTERIOR HINGED DOOR SHALL BE EQUIPPED WITH A SINGLE CYLINDER DEADBOLT WITH A 1" THROW AND HEAVY DUTY 4" STRIKE PLATE USING 3" SCREWS.
4. FRONT ENTRY DOORS SHALL BE EQUIPPED WITH 180-DEGREE DOOR VIEWER.
5. PUBLIC AMENITIES SHALL BE DESIGNED TIO DISCOURAGE MISUSE, E.G. BENCHES SHALL BE COMFORTABLE FOR SITTING BUT SLEEPING. WHERE POSSIBLE USE VANDAL- RESISTANT MATERIALS, E.G. PERFORATED OR WIRE MATERIALS TO DISCOURAGE GRAFFITI.
6. GRAFFITI-RESISTANT PAINT OR ANTI-GRAFFITI COATINGS SHALL BE USED ON WALLS, BENCHES, LIGHT POLES, SIGNS, ETC.
7. COMMON MAIL BOXES SHALL BE LOCATED IN WELL LIT, SECURE AREAS.
8. "SEE-THROUGH" FENCES, E.G. VERTICAL-DESIGN METAL WROUGHT IRON OR WELDED
MESH, INSTEAD OF SOLID WALLS OR HEDGES SHALL BE USED FOR BOUNDARIES WHERE PRIVACY OR ENVIRONMENTAL NOISE MITIGATION IS NOT NEEDED.
9. LANDSCAPING SHALL BE OF THE TYPE AND SITUATION TO MAXIMIZE OBSERVATION, WHILE PROVIDING THE DESIRED DEGREE OR AESTHETICS. MINIMIZE THE USE OF PLANTINGS WITH FOLIAGE OR SCREENING BETWEEN 30" AND 8 FEET ABOVE GRADE.
10. LUMINAIRES SHALL HAVE VANDAL-RESISTANT FIXTURES, IF ACCESSIBLE, OR BE NOT LESS THAN 8 FEET ABOVE GRADE.
11. SUFFICIENT ILLUMINATION SHALL BE INSTALLED THROUGHOUT THE PROJECT, ESPECIALLY IN PARKING AREAS. REPLACE BURNED-OUT LIGHTS PROMPTLY, LED LIGHTING IS MANDATORY THROUGHOUT THE PROJECT.
Legal Description
THE LAND REFERRED TO HEREIN BELOW IS SITUATED IN THE COUNTY OF SAN DIEGO, STATE OF CALIFORNIA, AND DESCRIBED AS FOLLOWS:
PARCEL A OF PARCEL MAP NO. 14122, IN THE CITY OF VISTA, COUNTY OF SAN DIEGO,
STATE OF CALIFORNIA, FILED IN THE OFFICE OF THE COUNTY RECORDER OF SAN DIEGO, JANUARY 21, 1986, AS INSTRUMENT NO. 86-025069 OF OFFICIAL RECORDS.
Project Directory
OWNER:
ESCONDIDO VENTURES, LLC
DARSHAN PATEL
1650 HOTEL CIRCLE NORTH, SUITE 120
SAN DIEGO, CA 92108
(619) 293 3349
[email protected]
STRUCTURAL ENGINEER:
MORGAN STRUCTURAL
(760) 690 7454
[email protected]
ARCHITECT:
ROBERT F TUTTLE ARCHITECT, INC.
38960 VISTA DAWN CT.
TEMECULA, CA 92592
(951) 302 5444
[email protected]
MEP ENGINEERS:
ENGCORE CONSULTING, INC.
FERNANDO BENDECK
1855 FIRST AVE, SUITE 100
SAN DIEGO, CA 92101
(858) 316 7017
[email protected]
Building and Accessibility Notes
1. ALTERATIONS IN COMMON AREAS SHALL COMPLY WITH CBC CHAPTER 11B.
2. AN AUTOMATIC SPRINKLER SYSTEM INSTALLED IN ACCORDANCE WITH CBC 903.3 SHALL BE PROVIDED TRHOUGHOUT ALL BUILDINGS WITH A GROUP R FIRE AREA.
3. ALL UNITS SHALL HAVE SMOKE ALARMS INSTALLED.
4. ALL ROOF STRUCTURES ARE TO REMAIN EXISTING. ANY PROPOSED MECHANICAL EQUIPMENT SHALL BE SCREENED BY THE BUILDING PARAPETS.
5. ACCESSIBILITY REQUIREMENTS PER CURRENT CODE SHALL BE MET AND INCLUDED ON THE BUILDING PERMIT PLAN SET.
CIVIC CEN
TER DR
SR-78
POSTAL W
AY
SANTA FE PL
SANTA FE AVE
Vicinity Map
NO SCALE
NORTH
Deferred Submittals
SUBMITTAL DOCUMENTS FOR DEFERRED SUBMITTAL ITEMS SHALL BE SUBMITTED TO
THE REGISTERED DESIGN PROFESSIONAL IS RESPONSIBLE CHARGE, WHO SHALL
REVIEW THEM AND FORWARD THEM TO THE BUILDING OFFICIAL WITH A NOTATION
INDICATING THAT THE DEFERRED SUBMITTAL DOCUMENTS HAVE BEEN REVIEWED AND
THAT THEY HAVE BEEN FOUND TO BE IN SUBSTANTIAL CONFIRMANCE WITH THE DESIGN OF THE BUILDING. THE DEFERRED SUBMITTAL ITEMS SHALL NOT BE INSTALLED UNTIL
THERE DESIGN AND SUBMITTAL DOCUMENTS HAVE BEEN APPROVED BY THE BUILDING OFFICIAL. CBC 107.3.4.1
1. AUTOMATIC FIRE SPRINKLER SYSTEM, NFPA 13R.
2. PHOTOVOLTAIC SYSTEM.
Scale
Set Date
Drawn By
Project Number
ALL DRAWINGS AND WRITTEN MATERIAL
APPEARING HEREIN CONSTITUTE ORIGINAL
AND UNPUBLISHED WORK OF THE
ARCHITECT AND MAY NOT BE DUPLICATED,
USED OR DISCLOSED WITHOUT WRITTEN
CONSENT OF ARCHITECT
SHEET NO.
12" = 1'-0"10/6/2025 10:58:13 AM
A0.0
Cover Sheet
Hotel Investment Group
Santa Fe Place Multi-Family
Author
Oct. 6, 2025
992952 & 958 Postal Way, Vista, CA 92083
Hotel Circle North, Suite 200, San Diego, CA 92108
SANTA FE PLACE
OFFICE CONVERSION TO MULTI-FAMILY RESIDENTIAL
952 & 958 POSTAL WAY
VISTA, CA 92083
Sheet List
Sheet No Sheet Name
Cu
rrent
Revision
A0.0 Cover Sheet 1
A0
.1 Specifications
A0.2 CalGreen Mandatory Measures
A0.3 CalGreen Mandatory Measures
A1.1 Site Plan 2
A1.2 Site Details 3
A2 Schedules 3
A3.1 Typical Details 2
A3.2 Typical Details 3
AA4.1 Building A Area Plans 3
AA4.2 Building A Floor Plans 3
AA4.3 Building A Roof Plan
AA5.1 Building A Elevations 3
AA5.2 Building A Sections
AA6.1 Building A Unit Plans 3
AA6.2 Building A Unit Plans 3
AA7 Building A Ceiling Plans 3
AAD1 Building A Demolition Plans
AB4.1 Building B Area Plans 1
AB4.2 Building B Floor Plans 3
AB5.1 Building B Elevations 1
AB5.2 Building B Sections
AB6.1 Building B Unit Plans West 3
AB6.2 Building B Unit Plans East 3
AB6.3 Building B Unit Plans East 3
ABD1 Building B Demolition Plans
S-1.0 General Notes
S-1.1 Typical Concrete Details
S-1.2 Typical Wood Details
S-2.0 Foundation Plan
S-2.1 Floor Framing Plan
S-2.2 Roof Framing Plan
S-3.0 Structural Details
M001 Mechanical Lead Sheet
M002 Mechanical Specifications
M003 Mechanical Specifications
M004 Mechanical Specifications
M211 Mechanical Building A Level 1 - Area A
M212 Mechanical Building A Level 1 - Area B
M221 Mechanical Building A Level 2 - Area A
M222 Mechanical Building A Level 2 - Area B
M231 Mechanical Building A Roof Plan
M311 Mechanical Building B Level 1
M312 Mechanical Building B Level 2
M331 Mechanical Building B Roof Plan
M501 Mechanical Details
M601 Mechanical Schedules
T001 Low-Rise Multi-Family Mandatory Measures - Building A T002 Low-Rise Multi-Family LMCC-ENV-01 T24 Forms - Building A T003 Low-Rise Multi-Family LMCC-MCH-01 T24 Forms - Building A T004 Low-Rise Multi-Family LMCC-PLB-01 T24 Forms - Building A T005 Low-Rise Multi-Family Mandatory Measures - Building B T006 Low-Rise Multi-Family LMCC-ENV-01 T24 Forms - Building B T007 Low-Rise Multi-Family LMCC-MCH-01 T24 Forms - Building B T008 Low-Rise Multi-Family LMCC-PLB-01 T24 Forms - Building B P001 Plumbing Lead Sheet
P002 Plumbing Schedules
P211 Plumbing Building A Level 1 - Area A
P212 Plumbing Building A Level 1 - Area B
P213 Plumbing Building A Level 1 Waste and Vent - Area A P214 Plumbing Building A Level 1 Waste and Vent - Area B P221 Plumbing Building A Level 2 - Area A
P222 Plumbing Building A Level 2 - Area B
P223 Plumbing Building A Level 2 Waste and Vent - Area A P224 Plumbing Building A Level 2 Waste and Vent - Area B P311 Plumbing Building B Level 1
P312 Plumbing Building B Level 2
P313 Plumbing Building B Level 1 Waste and Vent
P314 Plumbing Building B Level 2 Waste and Vent
P401 Plumbing Waste and Vent Diagram Building A
P402 Plumbing Domestic Water Diagram Building A
P401B Plumbing Waste and Vent Diagram Building B
P402B Plumbing Domestic Water Diagram Building B
P501 Plumbing Details
E001 Electrical Lead Sheet
E002 Electrical Fixture Schedules
EL101 Electrical Site Plan Lighting
EL102 Electrical Site Plan Lighting Calculations
EL211 Lighting Building A Level 1
EL212 Lighting Building A Level 1
EL221 Lighting Building A Level 2
EL221EM Lighting Building A Level 2
EL222 Lighting Building A Level 2
EL222EM Lighting Building A Level 2
EL311 Lighting Building B Level 1
EL312 Lighting Building B Level 1
EL312EM Lighting Building B Level 2
EP101 Electrical Site Plan Power
EP211 Power Building A Level 1
EP212 Power Building A Level 1
EP221 Power Building A Level 2
EP222 Power Building A Level 2
EP311 Power Building B Level 1
EP312 Power Building B Level 2
E401 Electrical 1-Line Diagram
E402 Electrical 1-Line Diagram
E601 Electrical Panel Schedules
E602 Electrical Panel Schedules
E603 Electrical Panel Schedules
TE01 Electrical Title 24 Forms
TE02 Electrical Title 24 Forms
TE03 Electrical Title 24 Forms
1 1
1 Delta Log
Delta Date Description
1 7/8/2024 Plan check 1, coordination
2 3
/12/2025 Coordination
3 7/30/2025 Fire Dept, SDG&E, Owner, Coordination
1 No. Description Date
1 Plan Check 1,
co
ordination
7/8/24
05/26/2026
C11
EXHIBIT 3
6. MAINTAIN AIR TEMPERATURE IN SPACES WHERE PRODUCTS WILL BE INSTALLED FOR TIME PERIOD BEFORE, DURING, AND AFTER INSTALLATION AS RECOMMENDED BY MANUFACTURER.
7. UPON COMPLETION OF INSTALLATION OF FLOOR COVERING, ADJACENT WORK, AND AFTER MATERIALS HAVE SET, CLEAN SURFACES AS RECOMMENDED BY MANUFACTURER.
09 51 - CEILING ACCESS PANELS
1. SPEC: ACCESS DOORS AND PANELS | FF SYSTEMS ACCESS PANELS | 12" X 12" DRYWALL INLAY ACCESS PANEL WITH DRYWALL FLANGE - DETACHABLE | SKU: F2DF-12-12 | SYSTEM F2 CODE: DF305305G127
2. SPEC: ACCESS DOORS AND PANELS | MILCOR | 12"X12" ARCHITECTURAL GRADE FLUSH DOOR | SKU: M-12-12-M | PRODUCT CODE: 3202-014
3. SPEC: ACCESS DOORS AND PANELS | MILCOR | 12" X12" STANDARD FLUSH DOOR FOR WALL OR CEILING INSTALLATION | SKU: DW-12-12-M | PRODUCT NUMBER: 3203-012
4. ALL ACCESS PANELS NEED TO BE ADEQUATE;Y SIZED BASED ON EQUIPMENT MAINTENANCE REQUIREMENTS AND EQUIPMENT REPLACEMENT REQUIREMENTS. REFER TO FINAL EQUIPMENT MANUFACTURERS INSTALLATION INSTRUCTIONS FOR MINIMUM REQUIRED ACCESS SIZE AND REQUIREMENTS. 09 65 & 68 - RESILIENT FLOORING AND CARPET
1. PROVIDE LABOR, MATERIAL, EQUIPMENT, AND SERVICES NECESSARY FOR THE INSTALLATION OF ALL RESILIENT FLOORING AS SHOWN ON THE DRAWINGS AND AS NOTED HEREIN.
2. CONDUCT ALL WORK IN CONFORMANCE WITH THE CBC AND RESILIENT FLOOR COVERING INSTITUTE WITH MATERIALS IN COMPLIANCE WITH ASTM STANDARDS FOR THEIR SPECIFIC USE.
3. COORDINATE FLOORING SUBCONTRACTOR WITH FRAMING AND CONCRETE CONTRACTORS TO ENSURE COMPATIBILITY OF ADHESIVES AND SUB-FLOOR SURFACE TEXTURE, MATERIALS, AND PREPARATION.
4. 4. MATERIALS:
A. AS INDICATED ON DRAWINGS.
B. VERIFY WITH ACOUSTICAL REPORT.
5. INSTALL IN COMPLIANCE WITH MANUFACTURER'S PRODUCT DATA, INCLUDING PRODUCT TECHNICAL
BULLETINS, PRODUCT CATALOG INSTALLATION INSTRUCTIONS AND PRODUCT CARTON INSTRUCTIONS FOR INSTALLATION.
6. MAINTAIN AIR TEMPERATURE IN SPACES WHERE PRODUCTS WILL BE INSTALLED FOR TIME PERIOD BEFORE, DURING, AND AFTER INSTALLATION AS RECOMMENDED BY MANUFACTURER.
7. UPON COMPLETION OF INSTALLATION OF FLOOR COVERING, ADJACENT WORK, AND AFTER MATERIALS HAVE SET, CLEAN SURFACES AS RECOMMENDED BY MANUFACTURER.
8. USE PRODUCTS THAT COMPLY WITH VOC CONTENT PER CALGREEN REQUIREMENTS AND AS NOTED IN THE ROOM FINISH NOTES.
09 91 - PAINTING
1. PROVIDE LABOR, MATERIAL, EQUIPMENT AND SERVICES NECESSARY FOR THE INSTALLATION OF ALL SURFACES WHERE SHOWN ON THE DRAWINGS AND AS NOTED HEREIN.
2. CONDUCT WORK IN COMPLIANCE WITH THE PAINTING AND DECORATING CONTRACTORS OF AMERICA (PDCA), "PAINTING SPECIFICATION MANUAL".
3. PROVIDE MATERIALS THAT ARE COMPATIBLE WITH ONE ANOTHER AND THE SUBSTRATES INDICATED UNDER
CONDITIONS OF SERVICE AND APPLICATION, AS DEMONSTRATED BY MANUFACTURER BASED ON TESTING AND FIELD EXPERIENCE.
4. EXCEPT WHERE SPECIFICALLY NOTED, ALL PAINT SHALL BE READY-MIXED AND PRE-TINTED. AGITATE ALL PAINT PRIOR TO AND DURING APPLICATION TO ENSURE UNIFORM COLOR, GLOSS, AND CONSISTENCY.
5. THINNER ADDITION SHALL NOT EXCEED MANUFACTURER'S PRINTED RECOMMENDATIONS. DO NOT USE SOLVENTS TO THIN WATER-BASED PAINTS. WHERE PAINT IS TO BE SPRAYED, THIN ACCORDING TO MANUFACTURER'S GUIDELINES.
6. APPLY PAINTS AND STAINS IN ACCORDANCE WITH MANUFACTURER'S PRINTED INSTALLATION INSTRUCTIONS.
INCLUDING, BUT NOT LIMITED TO, THE FOLLOWING MINIMUM STANDARDS:
A. SURFACES SHALL BE CLEAN, DRY, AND IN A SUITABLE CONDITION FOR FINISH SPECIFIED. REMOVE ALL OIL, GREASE, BOND BREAKING AGENTS, DUST, MILL SCALE, AND EFFLORESCENCE.
B. CRACKS, HOLES, AND KNOTS SHALL BE FILLED, SANDED SMOOTH, AND SEALED. WOOD SURFACES, EXCEPT RE SAWN WOOD, SHALL BE SANDED SMOOTH. SANDING DUST SHALL BE COMPLETELY REMOVED.
C. TRIM AND OUTER FINISH WORK SHALL BE BACK-PRIMED PRIOR TO INSTALLATION TO MINIMIZE INCONSISTENT SHRINKAGE.
D. EACH COAT SHALL BE UNIFORMLY APPLIED, WELL BRUSHED OUT, AND FREE OF BRUSH MARKS, RUNS, SAGS, OR SKIPS.
E. PAINT ALL EXPOSED EDGES OF TRIM TO MATCH THE TRIM FACE COLOR.
F. TOUCH UP ANY IMPERFECTIONS IN PAINTED SURFACES AFTER INSTALLATION OF TRIM, BASE, COUNTERS, ETC.
7. PAINT SHALL BE COMPLETE BEFORE HARDWARE IS INSTALLED.
8. PROTECT ALL ADJACENT SURFACES.
9. APPLICATION OF THE FIRST COAT CONSTITUTES ACCEPTANCE OF THE SURFACE.
SURPLUS PAINT WILL BE PROVIDED TO THE OWNER IN UNOPENED CONTAINERS (AMOUNT AS REQUESTED BY OWNER) FOR MAINTENANCE TOUCH-UP WORK.
10. SUBCONTRACTOR IS RESPONSIBLE FOR THE REMOVAL AND PROPER DISPOSAL OF ALL PAINT OR STAIN MATERIALS AND SUPPLIES AT JOB COMPLETION.
11. SUBCONTRACTOR IS RESPONSIBLE FOR ANY DAMAGE RESULTING FROM OVER SPRAY AND FOR ALL NECESSARY CLEAN-UP.
10 00 - SPECIALTIES
1. TOILET ACCESSORIES AS INDICATED IN ENLARGED RESTROOM AND BATH PLANS. INSTALL WITHIN ACCESSIBLE REACH RANGES. PROVIDE NECESSARY BLOCKING.
2. FIRE EXTINGUISHERS: UL CLASS 4-A MINIMUM WHERE SHOWN ON FLOOR PLANS. MAXIMUM TRAVEL DISTANCE 75 FEET.
21 13 21 - FIRE SPRINKLER SYSTEMS
1. PROVIDE LABOR, MATERIAL, EQUIPMENT AND SERVICES NECESSARY FOR THE INSTALLATION, REPAIR, AND / OR REHABILITATION OF THE EXISTING FIRE SPRINKLER SYSTEM.
2. CONDUCT WORK IN COMPLIANCE WITH NFPA 13.
3. COORDINATE THE WORK OF OTHER TRADES SO AS TO ASSURE THE PROPER FUNCTION OF THE SPRINKLER
SYSTEM AND TO AVOID INTERFERENCE WITH STRUCTURAL, MECHANICAL, ELECTRICAL, PLUMBING, OR ARCHITECTURAL FEATURES OF THE BUILDING.
4. COORDINATE WITH THE FIRE SPRINKLER AND ALARM TRADE TO ENSURE FULL AWARENESS OF THE LOCATION OF ALL CONTROL VALVES, FLOW SWITCHES, TAMPER SWITCHES AND ALARM AND SIGNAL SWITCHES.
5. SUBMIT SHOP DRAWINGS SHOWING THE PROPOSED LOCATIONS OF SPRINKLER HEADS
6. USE SPRINKLER HEADS OF THE SAME TYPE USED ELSEWHERE IN THE BUILDING
7. FIRE-SPRINKLER EXTENSIONS SHALL BE BRACED
22 00 - PLUMBING
SEE MECHANICAL DRAWINGS FOR PLUMBING SPECIFICATIONS
23 00 - HVAC
SEE MECHANICAL DRAWINGS FOR HVAC SPECIFICATIONS
25 00 - INTEGRATED AUTOMATION
SEE MECHANICAL AND ELECTRICAL DRAWINGS FOR AUTOMATION SPECIFICATIONS 26 00 - ELECTRICAL
SEE ELECTRICAL DRAWINGS FOR ELECTRICAL SPECIFICATIONS
27 00 - COMMUNICATIONS
1. DO NOT INTERRUPT UTILITIES SERVING FACILITIES WITHOUT OWNER'S APPROVAL.
2. COORDINATE MATERIALS AND EQUIPMENT SO THEY FORM AN INTEGRATED SYSTEM. MATCH COMPONENTS AND INTERCONNECTIONS FOR OPTIMUM FUTURE PERFORMANCE.
3. UNLESS NOTED OTHERWISE, PROVIDE SPARE FIBERS AND CONDUCTOR PAIRS IN CABLES, POSITIONS IN PATCH
PANELS, CROSS CONNECTS, AND TERMINAL STRIPS, AND SPACE IN BACKBONE CABLE TRAYS AND WIREWAYS TO ACCOMMODATE 50% FUTURE INCREASE IN ACTIVE STATION PAIRS.
4. COORDINATE PREMISES WITH LOCAL TELEPHONE CARRIER AND EQUIPMENT PROVIDER.
5. DISTRIBUTION CABLE: CATEGORY 6, FOUR-PAIR, 24 AWG, SOLID COPPER, UNSHIELDED, TWISTED PAIR IN PVC SHEATH.
6. BACKBOARD: 3/4" FIRE-RESISTANT INTERIOR GRADE PLYWOOD.
7. COMPLY WITH TIA 569-B RULES FOR SEPARATING UNSHIELDED COPPER COMMUNICATION AND DATA
PROCESSING EQUIPMENT CABLES FROM POTENTIAL EMI SOURCES, INCLUDING ELECTRICAL POWER LINES AND EQUIPMENT.
8. FACE PLATES SHALL MATCH ELECTRICAL POWER FACE PLATES.
9. IDENTIFY COMPONENTS OF THE COMMUNICATION SYSTEM.
10. TEST EACH SIGNAL PATH FOR END-TO-END PERFORMANCE FROM EACH END OF ALL PAIRS. 25 00 - INTEGRATED AUTOMATION
1. CONTROL OF GUEST ROOM LIGHTING, POWER AND HVAC SYSTEMS SHALL BE PER ENERGY COMPLIANCE REQUIREMENTS.
32 00 - EXTERIOR IMPROVEMENTS
1. SEE ARCHITECTURAL SITE PLAN AND CIVIL AND LANDSCAPE PLANS. 33 00 - UTILITIES
1. COMPLY WITH LOCAL UTILITY REQUIREMENTS. SEE ALSO CIVIL DRAWINGS.
9. INSTALL DOORS AND FRAMES IN ACCORDANCE WITH MANUFACTURER'S PRINTED INSTALLATION INSTRUCTION. 08 40 & 50 - STOREFRONTS AND WINDOWS
1. PROVIDE LABOR, MATERIAL, EQUIPMENT, AND SERVICES NECESSARY FOR THE INSTALLATION OF ALL STOREFRONTS AND WINDOWS WHERE SHOWN ON THE DRAWINGS AND AS NOTED HEREIN.
2. CONDUCT ALL WORK IN CONFORMANCE WITH THE CBC, AAMA AND WDMA MANUALS, AND IN COMPLIANCE WITH ASTM STANDARDS FOR THEIR SPECIFIC USE.
3. FIRE RATED WINDOWS SHALL STEEL FRAMES WITH WIRE GLASS OR FIRE GLASS AS NOTED IN THE WINDOW SCHEDULE AND WINDOW NOTES.
4. WINDOW FRAMES SHALL MATCH EXISTING PROFILE AND COLOR.
5. BEFORE INSTALLATION, VERIFY THAT OPENINGS ARE PLUMB AND SQUARE AND OF PROPER DIMENSION. REPORT FRAME DEFECTS OR UNSUITABLE CONDITIONS TO THE GENERAL CONTRACTOR BEFORE PROCEEDING.
BEGINNING OF INSTALLATION INDICATES ACCEPTANCE OF EXISTING CONDITIONS.
6. INSTALL STOREFRONTS AND WINDOWS IN ACCORDANCE WITH MANUFACTURER'S PRINTED INSTALLATION INSTRUCTION.
7. WINDOW GLASS, U-VALUES, AND SHGC RATINGS SHALL BE AS NOTED IN THE ENERGY COMPLIANCE FORMS AND/OR WINDOW NOTES.
8. SEE WINDOW NOTES AND/OR SITE PLAN FOR LOCATIONS OF WINDOWS REQUIRING SPECIAL STC RATINGS. 08 71 - DOOR HARDWARE
1. PROVIDE LABOR, MATERIAL, EQUIPMENT, AND SERVICES AS NECESSARY FOR THE INSTALLATION OF DOOR HARDWARE.
2. CONDUCT ALL WORK IN ACCORDANCE WITH THE CBC, INCLUDING ACCESSIBILITY REQUIREMENTS, AND LOCAL SECURITY REQUIREMENTS. OBTAIN ALL INTERACTING TYPES OF HARDWARE FROM A SINGLE MANUFACTURER.
PROVIDE HARDWARE TEMPLATES FOR PROPER INSTALLATION.
3. DOOR HARDWARE FOR EXTERIOR AND INTERIOR DOORS SHALL BE LEVER TYPE AS SELECTED BY OWNER.
DOORS SHALL HAVE A MINIMUM OF THREE (1-1/2 PAIR) HINGES. DOORS GREATER THAN 1-3/8", 36" WIDE OR 90" TALL SHALL HAVE A MINIMUM OF FOUR (2 PAIR) HINGES. EXTERIOR OUT SWINGING DOORS SHALL HAVE NONFERROUS HINGES WITH NON-REMOVABLE HINGE PINS. HINGES ON INTERIOR DOORS SHALL HAVE NON RISING PINS. LOW-FREQUENCY HINGES SHALL NOT BE USED.
4. EXTERIOR DOORS SHALL HAVE COMPLETE STOP-APPLIED WEATHER-STRIPPING, AND THRESHOLD WEATHERSTRIPPING.
5. INSTALLATION SHALL BE IN ACCORDANCE WITH LOCAL CODE AND SECURITY REQUIREMENTS, MANUFACTURER'S INSTRUCTIONS, AND AS INDICATED ON THE DRAWINGS FOR A COMPLETE, SMOOTH, AND PROPER OPERATION. 09 22 16 - NON STRUCTURAL METAL FRAMING
1. PROVIDE LABOR, MATERIAL, EQUIPMENT AND SERVICES NECESSARY FOR THE INSTALLATION OF ALL NON STRUCTURAL METAL FRAMING WHERE SHOWN ON THE DRAWINGS AND AS NOTED HEREIN.
2. CONDUCT WORK IN COMPLIANCE WITH THE CBC AND THE STEEL STUD MANUFACTURERS ASSOCIATION, WITH MATERIALS IN COMPLIANCE WITH ASTM C-645 AND C-754. INSTALL STEEL STUDS PER MANUFACTURER'S RECOMMENDATIONS.
3. CORROSION RESISTANT COATING SHALL COMPLY WITH ASTM A1003/A1003M AND ASTM A653/A653M G40 (Z120) OR
EQUIVALENT
4. MINIMUM STUD DIMENSIONS: WIDTH 1 5/8"; FLANGE 1 1/4"; RETURN 1/4"
5. STUD TRACKS SHALL MATCH GAUGE OF WALL STUDS.
6. PROVIDE CORNER ANGLE AT WALL EXTERIOR CORNERS AND SOFFIT EDGES.
7. USE FASTENERS OF TYPE, MATERIAL, SIZE, CORROSION RESISTANCE, HOLDING POWER, AND OTHER PROPERTIES REQUIRED TO FASTEN STEEL FRAMING AND FURRING MEMBERS SECURELY; COMPLYING WITH MANUFACTURER RECOMMENDATIONS.
09 24 - PORTLAND CEMENT PLASTER (STUCCO)
1. PROVIDE LABOR, MATERIAL, EQUIPMENT AND SERVICES NECESSARY FOR THE INSTALLATION OF PLASTER SYSTEM WHERE SHOWN ON THE DRAWINGS AND AS NOTED HEREIN.
2. CONDUCT ALL WORK IN CONFORMANCE WITH CBC 2507, 2510 AND 2512, ASSOCIATED ASTM STANDARDS, AND PORTLAND CEMENT ASSOCIATION'S PLASTER/STUCCO MANUAL.
3. PROVIDE AN ICC TESTED AND APPROVED 3-COAT SYSTEM COMPRISED OF SCRATCH, BROWN, AND FINISH COATS OVER METAL LATH OVER A WATER-RESISTIVE BARRIER OVER OPTIONAL SHEATHING.
A. PORTLAND CEMENT PER ASTM C150 FOR SCRATCH AND BROWN COATS. ACRYLIC FINISH COAT WITH INTEGRAL COLOR. COLOR AND FINISH AS NOTED ON ELEVATIONS.
B. METAL LATH PER ASTM C847, C933, C1032, AND C1063.
C. WATER-RESISTIVE BARRIER: GRADE D BUILDING PAPER, ONE LAYER AT OPEN STUDS; TWO LAYERS AT WOOD SHEATHING.
D. ALL REINFORCING BEADS, J-METAL, SCREEDS, CONTROL JOINTS, ETC., SHALL BE OF GALVANIZED METAL.
E. FOAM TRIM SHALL BE 1 LB/SF MIN. EPS APPLIED TO BASE COAT WITH MANUFACTURER'S ADHESIVE AND WRAPPED WITH 2 OZ. MIN. ALKALI RESISTANT WOVEN GLASS FIBER FABRIC. APPLY FINISH COAT OVER GLASS FIBER FABRIC.
4. INSTALL IN ACCORDANCE WITH THE MANUFACTURER'S PRINTED INSTALLATION INSTRUCTIONS AND BEST TRADE ASSOCIATION'S STANDARDS OF PRACTICE.
5. CONTROL JOINTS AS SHOWN ON ELEVATIONS OR 18'-0" O.C. MAX., FLAT PANELS 144 SF MAX., CURVED PANELS 100 SF. MAX., MAX. LENGTH TO WIDTH RATIO 2.5:1.
09 29 - GYPSUM BOARD
1. PROVIDE LABOR, MATERIAL, EQUIPMENT, AND SERVICES NECESSARY FOR THE INSTALLATION OF GYPSUM BOARD COMPLETE WHERE SHOWN ON DRAWINGS AND NOTED HEREIN.
2. CONDUCT ALL WORK IN CONFORMANCE WITH CALIFORNIA BUILDING CODE, CHAPTER 25; ASTM C-1396; AND GYPSUM ASSOCIATION GA-216-10 "APPLICATION AND FINISHING OF GYPSUM PANEL PRODUCTS".
3. PROVIDE GYPSUM BOARD AT LOCATIONS NOTED. PROVIDE ACCESSORIES AT ALL LOCATIONS AS REQUIRED FOR COMPLETE SYSTEM.
A. 5/8" THICK TYPE 'X' GYPSUM BOARD, TYPICAL. PROVIDE NUMBER OF LAYERS, MATERIALS, AND INSTALLATIONS IN COMPLIANCE WITH TESTED ASSEMBLIES.
B. IN WET AREAS, PROVIDE MOISTURE RESISTANT GYPSUM BOARD IN LOCATIONS SHOWN ON PLANS AND AS RECOMMENDED BY GYPSUM BOARD MANUFACTURER.
4. ACCESSORIES:
A. 4.1. 90 DEGREE RIGHT ANGLE CORNER BEAD AT ALL EXTERNAL CORNERS.
B. 4.2. CORROSION RESISTANT, L-TYPE EDGE TRIM AT ALL EXPOSED EDGES.
C. 4.3. SEMI-RIGID PVC FLEXIBLE CORNER BEAD AT RADIUSED OPENINGS.
D. 4.4. RESILIENT CHANNELS: PROVIDE MANUFACTURER'S SPECIAL SHAPED METAL FURRING CHANNEL IN GAGE AND SPACING AS REQUIRED FOR APPLICABLE FIRE OR SOUND RATED ASSEMBLIES.
E. 4.5. TAPE AND JOINT COMPOUND AS RECOMMENDED BY GYPSUM BOARD MANUFACTURER.
F. 4.6. PROVIDE PERMANENTLY RESILIENT SEALANT AT SOUND CONTROL JOINTS AS RECOMMENDED BY MANUFACTURER.
5. NAIL OR SCREW PER APPLICABLE CODE REQUIREMENTS. REFER TO DRAWINGS FOR SPECIAL NAILING AT SHEAR WALLS AND FIRE/SOUND RATED ASSEMBLIES. THE CONTRACTOR AT HIS OPTION MAY SUBSTITUTE WALLBOARD SCREWS OF EQUIVALENT PROPERTIES IN LIEU OF NAILS AS PERMITTED BY AUTHORITY HAVING JURISDICTION.
FASTENERS AT MULTIPLE LAYER APPLICATIONS SHALL BE SIZED ACCORDINGLY.
6. ALL GYPSUM BOARD SHALL BE OF THE TYPE, EDGE, CONFIGURATION, ARRANGEMENT AND MAXIMUM LENGTHS AVAILABLE TO MINIMIZE END TO END BUTT JOINTS. ALL JOINTS IN FINISHED SURFACES SHALL BE TAPED AND FINISHED WITH JOINT COMPOUND. REINFORCE ALL CORNERS AND CONCEAL EXPOSED NAIL OR SCREW HEADS WITH JOINT COMPOUND. METAL TRIM SHALL BE APPLIED TIGHTLY TO GYPSUM BOARD EDGES, PLUMB, LEVEL, TRUE TO PLAN, AND SECURELY ATTACHED. ALL GYPSUM WALL BOARD CONCEALING TUB NAILING FINS SHALL BE ALIGNED WITH ADJACENT WALL PLANES SUCH THAT THE TRUE WALL PLANE IS MAINTAINED.
7. FINISH LEVELS AS DESCRIBED IN ROOM FINISH SCHEDULE NOTES.
8. PREPARE EXISTING WALLS AS NECESSARY TO RECEIVE NEW FINISHES. 09 30 - CERAMIC TILE
1. PROVIDE LABOR, MATERIAL, EQUIPMENT, AND SERVICES NECESSARY FOR THE INSTALLATION OF ALL CERAMIC TILE WORK AS SHOWN ON THE DRAWINGS AND AS NOTED HEREIN.
2. INSTALLATION SHALL CONFORM TO TILE COUNCIL OF NORTH AMERICA'S "HANDBOOK FOR CERAMIC, GLASS, AND STONE TILE INSTALLATION", CURRENT EDITION.
3. CONDUCT ALL WORK IN CONFORMANCE WITH THE CBC, ICC EVALUATION REPORTS, AND MANUFACTURER'S
INSTALLATION REQUIREMENTS, WITH MATERIALS IN COMPLIANCE WITH ASTM STANDARDS FOR THEIR SPECIFIC USE.
4. MATERIALS:
A. FLOOR TILE: AS SELECTED BY INTERIOR DESIGNER.
B. GROUT: COLOR AS SELECTED BY INTERIOR DESIGNER.
C. PROVIDE NON-SLIP SURFACE AS TILED WALKING SURFACES.
5. CONTRACTOR SHALL INSPECT SUBSTRATE FOR READINESS TO RECEIVE TILE. REPORT DEFICIENCIES IMMEDIATELY IN WRITING TO THE ARCHITECT. FAILURE TO DO SO, OR COMMENCEMENT OF WORK WITHOUT SUCH NOTIFICATION, WILL CONSTITUTE AN ACCEPTANCE BY CONTRACTOR OF PREVIOUS WORK BY OTHERS.
6. VERIFY ALL SIZES AND DIMENSIONS BY TAKING FIELD MEASUREMENTS PRIOR TO INSTALLATION.
7. VERIFY ALL OPENINGS AS PLUMB, SQUARE, AND TRUE.
8. TILE SHALL BE THIN SET.
09 50 - SUSPENDED ACOUSTIC CEILINGS
1. SEE REFLECTED CEILING PLANS FOR SUSPENDED ACOUSTIC CEILING SPECIFICATIONS 09 65 - RESILIENT FLOORING
1. PROVIDE LABOR, MATERIAL, EQUIPMENT, AND SERVICES NECESSARY FOR THE INSTALLATION OF ALL RESILIENT FLOORING AS SHOWN ON THE DRAWINGS AND AS NOTED HEREIN.
2. CONDUCT ALL WORK IN CONFORMANCE WITH THE CBC AND RESILIENT FLOOR COVERING INSTITUTE WITH MATERIALS IN COMPLIANCE WITH ASTM STANDARDS FOR THEIR SPECIFIC USE.
3. COORDINATE FLOORING SUBCONTRACTOR WITH FRAMING AND CONCRETE CONTRACTORS TO INSURE COMPATIBILITY OF ADHESIVES AND SUB-FLOOR SURFACE TEXTURE, MATERIALS, AND PREPARATION.
4. MATERIALS:
4.1. AS INDICATED ON DRAWINGS.
4.2. VERIFY WITH ACOUSTICAL REPORT.
5. INSTALL IN COMPLIANCE WITH MANUFACTURER'S PRODUCT DATA, INCLUDING PRODUCT TECHNICAL BULLETINS, PRODUCT CATALOG INSTALLATION INSTRUCTIONS AND PRODUCT CARTON INSTRUCTIONS FOR INSTALLATION.
11. CONCRETE FOR GARDEN WALL FOOTINGS SHALL HAVE MINIMUM COMPRESSIVE STRENGTH OF 2500 PSI AT 28 DAYS. CEMENT TYPE SHALL BE THE SAME AS REQUIRED FOR THE BUILDING FOOTINGS. 03 33 - EXTERIOR CONCRETE POOL DECK
1. POOL CONSTRUCTION AND ASSOCIATED EQUIPMENT ARE DESIGN/BUILD BY THE POOL SUBCONTRACTOR.
2. SEE POOL PLAN NOTES WITHIN THESE PLANS FOR ADDITIONAL INFORMATION.
3. INTEGRAL COLORED CONCRETE AND FINISH SHALL BE AS NOTED ON POOL PLAN OR POOL PLAN NOTES 03 35 - GYPSUM CONCRETE UNDERLAYMENT
1. GYPSUM CONCRETE UNDERLAYMENT SHALL BE AS NOTED IN FLOOR/CEILING ASSEMBLY DETAILS. INSTALL PER MANUFACTURER'S INSTRUCTIONS.
2. SOUND REDUCTION BOARD AS NOTED IN FLOOR/CEILING ASSEMBLY DETAILS. INSTALL PER MANUFACTURER'S INSTRUCTIONS.
04 42 - UNIT MASONRY
1. PROVIDE LABOR, MATERIAL, EQUIPMENT, AND SERVICES NECESSARY FOR INSTALLATION AND COMPLETION OF ALL UNIT MASONRY AS SHOWN ON THE DRAWINGS AND AS NOTED HEREIN.
2. MASONRY SPECIFICATIONS SHOWN HERE ARE FOR NON-STRUCTURAL MASONRY CONSTRUCTION. SEE STRUCTURAL DRAWINGS FOR STRUCTURAL MASONRY SPECIFICATIONS.
3. CONCRETE MASONRY MATERIALS AND CONSTRUCTION SHALL CONFORM TO ACI 530.
4. CONCRETE MASONRY UNITS SHALL BE GRADE 'N' PER ASTM C 90 AND SHALL BE MADE WITH LIGHTWEIGHT AGGREGATE. MINIMUM NET COMPRESSIVE STRENGTH OF 1500 PSI AT 28 DAYS.
5. MORTAR SHALL CONFORM TO ASTM C 270 WITH A MINIMUM COMPRESSIVE STRENGTH OF 2000 PSI AT 28 DAYS.
6. GROUT SHALL CONFORM TO ASTM C 476 WITH A MINIMUM COMPRESSIVE STRENGTH OF 2000 PSI AT 28 DAYS.
7. REINFORCING BARS SHALL BE GRADE 40 PER ASTM A 615. SIZES AS SHOWN IN DETAILS.
8. LAY BLOCK IN RUNNING BOND PATTERN UNLESS NOTED OTHERWISE ON DRAWINGS. USE PRECISION FACE AND SPLIT FACE BLOCK WHERE SHOWN.
9. GROUT ALL CELLS SOLID CONTAINING REINFORCING.
05 12 - STRUCTURAL STEEL
1. SEE STRUCTURAL DRAWINGS FOR STRUCTURAL STEEL SPECIFICATIONS 06 10 - ROUGH CARPENTRY
1. SEE STRUCTURAL DRAWINGS FOR STRUCTURAL ROUGH CARPENTRY SPECIFICATIONS IN ADDITION TO THE FOLLOWING.
2. PROVIDE LABOR, MATERIAL, EQUIPMENT, AND SERVICES NECESSARY FOR INSTALLATION AND COMPLETION OF ALL ROUGH CARPENTRY AS SHOWN ON THE DRAWINGS AND AS NOTED HEREIN.
3. CONDUCT ALL WORK IN CONFORMANCE WITH THE CBC. ALL MATERIALS WILL BE IN COMPLIANCE WITH THE WEST COAST LUMBER INSPECTION BUREAU (WCLIB) AND THE AMERICAN PLYWOOD ASSOCIATION (APA) STANDARDS.
4. WORKMANSHIP: ALL MEMBERS SHALL BE FRAMED, ANCHORED, TIED AND BRACED SO AS TO DEVELOP THE STRENGTH AND RIGIDITY NECESSARY FOR THE PURPOSES FOR WHICH THEY ARE INTENDED.
5. INSTALL FIRE BLOCKS AND DRAFT STOPS PER CBC SECTION 718.
6. 2x SILL PLATES AT INTERIOR WALLS SHALL BE SECURED TO CONCRETE SLABS WITH .145" DIA. x 21/2" POWDER DRIVEN SHOT PINS AT 32" O.C. MAX., EXCEPT AS SHOWN OTHERWISE ON PLANS, AND 6" MAX. FROM SILL PLATE CORNERS AND SPLICES. RAMSET 1516SDC, ICC ESR-1799, OR APPROVED EQUAL. COMPLY WITH MFR'S SPECS.
7. PROVIDE BLOCKING AT WALL STOPS, TVs, KITCHEN CABINETS, VANITIES, HEADBOARDS, CEILING FANS, TOILET ACCESSORIES, AND CLOSET SHELF & POLE.
06 20 - FINISH CARPENTRY
1. PROVIDE LABOR, MATERIAL, EQUIPMENT, AND SERVICES NECESSARY FOR THE INSTALLATION OF FINISH CARPENTRY WHERE SHOWN ON THE DRAWINGS AND AS NOTED HEREIN.
2. INSTALL ALL FINISHED HARDWARE, PASSAGE DOORS, AND TOILET ACCESSORIES.
3. CONDUCT ALL WORK IN CONFORMANCE WITH THE CBC AND THE WOODWORK INSTITUTE'S, "MANUAL OF MILLWORK" CUSTOM GRADE REQUIREMENTS.
4. ALL INTERIOR DOOR FRAMES AND CASING, BASE, SHOE, SHELVING, AND WINDOW STOOL AND APRON AS INDICATED ON DRAWINGS.
5. INSTALL IN ACCORDANCE WITH THE BEST PRACTICES OF THIS TRADE, INCLUDING, BUT NOT LIMITED TO THE FOLLOWING:
A. ALL WORK SHALL BE MACHINED OR HAND-SANDED, SHARP EDGES AND SPLINTERS REMOVED AND COMPLETELY PREPARED FOR FINISH.
B. FULL LENGTH CONTINUOUS MATERIAL SHALL BE USED WHEREVER POSSIBLE OR SPECIFICALLY NOTED.
C. ALL JOINTS SHALL BE TIGHT AND TRUE AND SECURELY FASTENED. CORNERS SHALL BE NEATLY MITERED, BUTTED, OR COPED, WITH NAILS SET AND SURFACES FREE OF TOOL MARKS.
D. FRAMES SHALL BE SET PLUMB AND TRUE.
E. ALL NAILING SHALL BE DONE WITH FINISH NAILS WHERE PAINT OR STAIN IS TO COVER. 06 41 - CASEWORK
1. PROVIDE MATERIAL, EQUIPMENT, AND LABOR NECESSARY FOR INSTALLATION OF ALL CASEWORK AS SHOWN ON THE DRAWINGS AND AS NOTED HEREIN.
2. CASEWORK AND COUNTERTOPS AS INDICATED ON DRAWINGS.
3. INSTALL IN ACCORDANCE WITH THE BEST PRACTICES OF THIS TRADE, INCLUDING, BUT NOT LIMITED TO THE FOLLOWING:
A. ALL JOINTS SHALL BE TIGHT AND TRUE AND SECURELY FASTENED. CORNERS SHALL BE MITERED, BUTTED, OR COPED, NAILS SET, AND SURFACES FREE OF TOOL MARKS.
B. USE CONCEALED FASTENINGS WHERE POSSIBLE.
C. ALL CASEWORK SCHEDULED FOR PAINT OR STAIN FINISH SHALL BE SMOOTHLY DRESSED AND SANDED.
D. INSTALL ALL WORK LEVEL, PLUMB, SQUARE AND TRUE. SCRIBE MEMBERS ACCURATELY IN PLACE TO FIT ADJOINING SURFACES.
07 00 - THERMAL AND MOISTURE PROTECTION
1. PROVIDE LABOR, MATERIAL, EQUIPMENT, AND SERVICES NECESSARY FOR THE INSTALLATION OF THERMAL AND THERMAL AND MOISTURE PROTECTION SYSTEMS WHERE SHOWN ON THE DRAWINGS AND NOTED HEREIN.
2. CONDUCT ALL WORK IN CONFORMANCE WITH THE CBC WITH MATERIALS IN COMPLIANCE WITH ASTM STANDARDS FOR THEIR SPECIFIC USE.
3. ROOFING AND UNDERLAYMENT AS INDICATED IN ROOF PLAN NOTES.
4. FLASHING SHALL BE MINIMUM 26 GA. GALVANIZED STEEL, UNLESS NOTED OTHERWISE.
5. USE GLASS FIBER BATT INSULATION WITH 'R' VALUES PER MINIMUM ENERGY CODE REQUIREMENTS OR AS PER ENERGY COMPLIANCE FORMS, ACOUSTICAL REQUIREMENTS, AND RATED ASSEMBLY DETAILS.
6. INSTALL IN ACCORDANCE WITH MANUFACTURER'S PRINTED INSTALLATION INSTRUCTIONS INCLUDING, BUT NOT LIMITED TO, THE FOLLOWING:
A. INSTALL BATT INSULATION BETWEEN FLOOR JOISTS AND WALL STUDS.
B. INSULATION SHALL BE SECURELY INSTALLED AND TIGHTLY FITTED.
C. WIRES WILL BE USED FOR SUPPORT ON UNSUPPORTED SIDES.
7. SEALANTS: ELASTOMERIC COMPLYING WITH ASTM C920. MATCH COLOR OF ADJACENT MATERIALS. WHERE IN CONTACT WITH FOOD USE PRODUCTS COMPLYING WITH 21 CFR 177.2600.
8. FIRESTOP SEALANT AS NOTED IN FIRE ASSEMBLY DETAILS.
9. COMPLY WITH VOC LIMITS AS INDICATED IN CALGREEN NOTES.
10. RUBBERIZED ASPHALT FLASHING: POLYMER MODIFIED ASPHALT LAMINATED POLYETHYLENE FILM CONFORMING TO ASTM D 1970, SELF ADHERED. GCP APPLIED TECHNOLOGIES, W.R. MEADOWS, POLYGUARD PRODUCTS OR APPROVED EQUAL.
07 21 - INSULATION
1. PROVIDE LABOR, MATERIAL, EQUIPMENT, AND SERVICES NECESSARY FOR THE INSTALLATION OF THERMAL AND ACOUSTICAL INSULATION WHERE SHOWN ON THE DRAWINGS AND NOTED HEREIN.
2. CONDUCT ALL WORK IN CONFORMANCE WITH THE CBC WITH MATERIALS IN COMPLIANCE WITH ASTM STANDARDS FOR THEIR SPECIFIC USE.
3. USE GLASS FIBER BATT INSULATION WITH 'R' VALUES PER ACOUSTICAL REQUIREMENTS AND RATED ASSEMBLY DETAILS.
4. INSTALL IN ACCORDANCE WITH MANUFACTURER'S PRINTED INSTALLATION INSTRUCTIONS INCLUDING, BUT NOT LIMITED TO, THE FOLLOWING:
4.1. INSTALL BATT INSULATION BETWEEN FLOOR JOISTS AND WALL STUDS.
4.2. INSULATION SHALL BE SECURELY INSTALLED AND TIGHTLY FITTED.
4.3. WIRES WILL BE USED FOR SUPPORT ON UNSUPPORTED SIDES. 08 10 - DOORS
1. PROVIDE LABOR, MATERIAL, EQUIPMENT, AND SERVICES NECESSARY FOR THE INSTALLATION OF ALL DOORS WHERE SHOWN ON THE DRAWINGS AND AS NOTED HEREIN.
2. CONDUCT ALL WORK IN CONFORMANCE WITH THE CBC, WDMA I.S. 1A-11, AND AWI "ARCHITECTURAL WOODWORK STANDARDS", IN COMPLIANCE WITH NFPA AND ASTM STANDARDS FOR THEIR SPECIFIC USE.
3. FIRE RATED DOORS AND FRAMES SHALL BE LISTED BY UL, WARNOCK HERSEY, OR OTHER APPROVED TESTING LABORATORY, WITH LABELS INDICATING THE FIRE RESISTANCE OF THE DOOR AND FRAME.
4. DOOR FRAMES SHALL MATCH EXISTING PROFILE AND COLOR.
5. PROVIDE DOORS HAVING WIDTHS AND HEIGHTS AS NOTED ON PLANS WITH UNDERCUTS AS REQUIRED BY MOST CURRENT CMC. MATCH EXISTING DOORS IN SPECIES, GRAIN, STAIN, AND FINISH.
6. WHERE LOUVERS ARE SHOWN IN DOORS, VERIFY SIZES AND NET FREE VENTILATION AREA WITH MECHANICAL DRAWINGS.
7. PROVIDE WIRE GLASS IN RATED DOORS WITH VISION PANELS AS INDICATED IN PLANS.
8. BEFORE INSTALLATION, VERIFY THAT OPENINGS ARE PLUMB AND SQUARE AND OF PROPER DIMENSION. REPORT FRAME DEFECTS OR UNSUITABLE CONDITIONS TO THE GENERAL CONTRACTOR BEFORE PROCEEDING.
BEGINNING OF INSTALLATION INDICATES ACCEPTANCE OF EXISTING CONDITIONS.
6. SUBMITTALS MADE TO THE ARCHITECT SHALL BE COMPLETE, NEATLY ORGANIZED, AND CONCISE. INCOMPLETE SUBMITTALS, PHASED SUBMITTALS, ETC. WILL BE REJECTED. SUBMITTALS SHALL BE CLEARLY ORGANIZED, REFERENCE APPROPRIATE DRAWING SHEET NUMBERS, SPEC SECTIONS, ETC. WHERE RESUBMITTALS ARE
REQUIRED, THEY SHALL BE CLEARLY IDENTIFIED AS A REVISION WITH THE SAME SUBMITTAL NUMBER AND A VERSION SUFFIX. CONFUSING, DECEPTIVE, AND/OR MISLEADING SUBMITTALS WILL BE REJECTED WITH MINIMAL COMMENTARY DESCRIBING THE REASON FOR THE REJECTION. THE CONTRACTOR SHALL REVISE THE SUBMITTAL AND RESUBMIT.
7. NO SUBSTITUTIONS WILL BE PERMITTED WITHOUT A WRITTEN REQUEST TO THE ARCHITECT. SUCH REQUESTS
SHALL INCLUDE DIMENSIONAL, PERFORMANCE, AND MATERIAL SPECIFICATIONS, AND AN EXPLANATION AS TO WHY THE SUBSTITUTION IS SOUGHT. SUBSTITUTED ITEMS THAT DEVIATE FROM THE SPECIFIED ITEM MUST INCLUDE A LINE-BY-LINE DESCRIPTION OF THOSE DEVIATIONS. SUBSTITUTIONS AFFECTING COST MUST INCLUDE THE ASSOCIATED CREDIT. THE SUBMITTAL PROCESS SHALL NOT BE USED TO REQUEST SUBSTITUTIONS. SUBSTITUTION REQUESTS SHALL BE MADE SEPARATELY AS REQUIRED IN THESE SPECIFICATIONS. ONCE A SUBSTITUTION IS APPROVED, IT SHALL BE SUBMITTED VIA THE STANDARD SUBMITTAL
PROCESS FOR FINAL REVIEW
8. THE CONTRACTOR SHALL NOT BE RELIEVED OF THE RESPONSIBILITY FOR DEVIATIONS FROM THE CONTRACT
DOCUMENTS BY THE ARCHITECT'S OR CONSULTANTS' REVIEW STAMP UNLESS THE CONTRACTOR HAS
SPECIFICALLY INFORMED THE ARCHITECT IN WRITING OF SUCH DEVIATIONS AT THE TIME OF THE SUBMITTAL AND THE ARCHITECT HAS:
1. IF A SUBSTITUTION AFFECTS OTHER TRADES, THE GENERAL CONTRACTOR IS RESPONSIBLE TO ASCERTAIN
THE IMPACT OF THE PROPOSED CHANGES AND SHALL BE RESPONSIBLE FOR ALL ASSOCIATED COSTS WHICH MAY BE INCURRED THEREBY.
9. THE CONTRACTOR SHALL NOT BE RELIEVED OF RESPONSIBILITY FOR ERRORS IN SUBMITTALS BY THE PRESENCE OF THE ARCHITECT'S OR CONSULTANT'S REVIEW STAMP.
10. THE CONTRACTOR SHALL DIRECT SPECIFIC ATTENTION TO REVISIONS IN THE SUBMITTALS OTHER THAN THOSE THE ARCHITECT OR CONSULTANT REQUESTED. IN THE ABSENCE OF SUCH ATTENTION THE ARCHITECT'S OR CONSULTANT'S REVIEW OF A RESUBMISSION SHALL NOT APPLY TO SUCH REVISIONS.
11. SUBMITTALS SHOULD BE TRANSMITTED ELECTRONICALLY WHENEVER POSSIBLE AND PHYSICALLY ONLY WHEN NECESSARY. ELECTRONIC SUBMITTALS SHOULD BE SENT TO THE PROJECT MANAGER . WHERE THERE IS DOUBT AS TO WHETHER HARDCOPY IS NECESSARY, CONTACT THE PROJECT ARCHITECT OR PROJECT MANAGER.
12. WHERE THE WORDS "OR APPROVED EQUAL" OR "OR EQUIVALENT" APPEAR IN THE CONTRACT DOCUMENTS, DO
NOT ASSUME AN ALTERNATE MATERIAL, EQUIPMENT, OR METHOD WILL BE APPROVED AS EQUAL BY THE OWNER AND ARCHITECT UNLESS THE ITEM IS SPECIFICALLY APPROVED BY THE OWNER.
13. PROVIDE FIELD SAMPLES OF EXTERIOR FINISH MATERIALS MINIMUM 2' SQUARE SIZE. OWNER AND ARCHITECT NEED TO APPROVE SAMPLES PRIOR TO INSTALLING FINAL COLORS ON THE BUILDING.
14. WHERE MANUALS ARE REQUIRED TO BE SUBMITTED COVERING ITEMS INCLUDED IN THE WORK, PREPARE SUCH MANUALS IN DURABLE PLASTIC BINDERS WITH AT LEAST THE FOLLOWING:
1. IDENTIFY ON EACH BINDER THE GENERAL NATURE OF IT'S CONTENTS.
2. TYPEWRITTEN INDEX NEAR THE FRONT.
3. OPERATING AND MAINTENANCE INSTRUCTIONS OF ALL EQUIPMENT INVOLVED.
4. LIST OF REPLACEABLE PARTS, THEIR PART NUMBERS, CURRENT COST, CONTACT INFORMATION OF NEAREST VENDOR.
5. COPY OF ALL GUARANTEES AND WARRANTIES ISSUED.
6. COPY OF REVIEWED SHOP DRAWINGS MADE DURING CONSTRUCTION.
15. ALLOW 14 DAYS FOR ARCHITECT AND/OR CONSULTANTS TO REVIEW SUBMITTALS. ALLOW ADDITIONAL TIME FOR INTERRELATED SUBMITTALS.
16. THE FOLLOWING SUBMITTALS ARE REQUIRED:
03 CONCRETE
03 FORM WORK
04 MASONRY
04 ANCHORAGE AND REINFORCING
04 MULTI-STORY HOLD DOWN SYSTEM
05 STRUCTURAL STEEL, STAIRS, RAILINGS
06 FLOOR AND ROOF TRUSSES
07 ROOFING, FLASHING
07 WATERPROOFING
08 DOORS AND HARDWARE
08 STOREFRONTS
08 WINDOWS
10 SIGNAGE
10 TOILET ACCESSORIES
11 LINEN CHUTE
12 SITE AMENITIES, FURNITURE
13 POOL
14 ELEVATOR
21 FIRE SPRINKLERS / ALARM
22 PLUMBING
23 HVAC, ENERGY EFFICIENCY CONTROLS
26 ELECTRICAL
26 LIGHTING FIXTURES, MATERIALS, CONTROLS
46 SITE UTILITY MATERIALS
01 45 - QUALITY CONTROL
1. INFORM THE OWNER IN ADVANCE WHEN THE NEED FOR SPECIAL INSPECTIONS IS APPROACHING IN ORDER TO GIVE SUFFICIENT TIME TO SCHEDULE THE SPECIAL INSPECTION.
2. COMPLY WITH APPLICABLE LAWS, ORDINANCES, RULES, REGULATIONS AND ORDERS OF ANY PUBLIC AUTHORITY
HAVING JURISDICTION FOR THE SAFETY OF PERSONS AND PROPERTY, PROTECTING THEM FROM DAMAGE, INJURY OR LOSS. ERECT AND MAINTAIN SAFEGUARDS NECESSARY FOR SAFETY AND PROTECTION, INCLUDING FENCES, RAILINGS, BARRICADES, LIGHTING, POSTING OF DANGER SIGNS AND OTHER WARNINGS AGAINST HAZARDS. THE
CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR INITIATING, MAINTAINING AND SUPERVISING ALL SAFETY MEASURES IN CONNECTION WITH THE PROJECT.
3. ALL MATERIALS, PRODUCTS AND EQUIPMENT SHALL BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURER’S
INSTRUCTIONS AND RECOMMENDATIONS UNLESS MORE STRINGENT REQUIREMENTS ARE INDICATED IN THE CONTRACT DOCUMENTS.
4. EACH SUBCONTRACTOR AND SUPPLIER SHALL BE RESPONSIBLE FOR BEING FAMILIAR WITH AND INSURING THAT
ALL WORKMANSHIP AND/OR MATERIALS FURNISHED MEET WITH ALL APPLICABLE STATE, COUNTY, CITY, AND OTHER JURISDICTIONAL AGENCY REQUIREMENTS.
5. COPIES OF ANY CERTIFICATES OF COMPLIANCE REQUIRED BY AUTHORITIES HAVING JURISDICTION, SHALL BE FORWARDED TO THE BUILDING OWNER UPON COMPLETION OF WORK.
6. ALL MATERIALS FURNISHED SHALL BE NEW AND OF FIRST QUALITY. NO USED MATERIALS OR SECONDS WILL BE PERMITTED EXCEPT BY OWNER'S APPROVAL.
01 74 - CLEANING AND WASTE MANAGEMENT
1. THE CONTRACTOR SHALL BE FAMILIAR WITH THE CITY OF [CITY NAME] CONSTRUCTION MATERIAL REUSE, RECYCLING, AND DISPOSAL PROGRAM, AND HOW IT MAY AFFECT CONSTRUCTION ACTIVITIES.
2. KEEP THE PREMISES CLEAN OF ANY ACCUMULATED WASTE MATERIALS. REMOVE ALL TRASH, TOOLS,
SCAFFOLDING AND SURPLUS MATERIALS AS CONSTRUCTION PROGRESSES AND AT THE COMPLETION OF THE WORK. CLEAN ALL FIXTURES, EQUIPMENT, GLAZING, FLOORS AND OTHER SURFACES UPON COMPLETION OF THE WORK AND MAKE READY FOR OCCUPANCY.
3. FOLLOWING THE INSTALLATION OF FINISH FLOOR MATERIALS, PROTECT BY COVERING WITH TEMPORARY
COVERINGS AND/OR CLEAN THE FINISH FLOOR DAILY (AND MORE OFTEN IF NECESSARY) AT ALL TIMES WHILE WORK IS BEING PERFORMED IN THE SPACE IN WHICH FINISH MATERIALS HAVE BEEN INSTALLED. "CLEAN", FOR
THE PURPOSE OF THIS SUBPARAGRAPH, SHALL BE INTERPRETED AS MEANING FREE FROM ALL FOREIGN MATERIAL, WHICH MAY BE INJURIOUS TO THE FINISH FLOOR MATERIAL. 01 77 - CLOSEOUT PROCEDURE
1. PRIOR TO REQUESTING INSPECTION FOR SUBSTANTIAL COMPLETION (FOR EITHER ENTIRE WORK OR PORTIONS THEREOF), COMPLETE THE FOLLOWING AND LIST KNOWN EXCEPTIONS IN REQUEST:
A. INCLUDE SUPPORTING DOCUMENTATION FOR COMPLETION AS INDICATED IN THESE CONTRACT DOCUMENTS.
B. SUBMIT STATEMENT SHOWING ACCOUNTING OF CHANGES TO CONTRACT SUM.
C. PREPARE, SUBMIT AND COMPLETE A PUNCH LIST IN ACCORDANCE WITH GENERAL CONDITIONS.
D. SUBMIT SPECIFIC WARRANTIES, WORKMANSHIP/MAINTENANCE BONDS, MAINTENANCE AGREEMENTS, FINAL CERTIFICATIONS, AND SIMILAR DOCUMENTS.
E. OBTAIN AND SUBMIT RELEASES ENABLING OWNER'S FULL AND UNRESTRICTED USE OF THE WORK
AND ACCESS TO SERVICES AND UTILITIES, INCLUDING (WHERE REQUIRED) OCCUPANCY PERMITS, OPERATING CERTIFICATES, WAIVERS OF LIEN, AND SIMILAR RELEASES.
F. SUBMIT RECORD DRAWINGS, MAINTENANCE MANUALS, AND SIMILAR FINAL RECORD INFORMATION.
G. DELIVER TOOLS, SPARE PARTS, EXTRA STOCKS OF MATERIALS, AND SIMILAR PHYSICAL ITEMS TO OWNER.
H. COMPLETE START-UP TESTING OF SYSTEMS, AND INSTRUCTIONS OF OWNER'S OPERATING/MAINTENANCE PERSONNEL. DISCONTINUE (OR CHANGE OVER) AND REMOVE FROM
PROJECT SITE TEMPORARY FACILITIES AND SERVICES, ALONG WITH CONSTRUCTION TOOLS AND FACILITIES, MOCK-UPS, AND SIMILAR ELEMENTS.
I. COMPLETE FINAL CLEANING UP REQUIREMENTS, INCLUDING TOUCH-UP PAINTING OF MARRED SURFACES.
J. TOUCH-UP AND OTHERWISE REPAIR AND RESTORE MARRED, EXPOSED FINISHES.
2. UPON RECEIPT OF CONTRACTOR'S REQUEST, THE ARCHITECT WILL EITHER PROCEED WITH INSPECTION OR ADVISE CONTRACTOR OF PREREQUISITES NOT FULFILLED. FOLLOWING INITIAL INSPECTION, THE ARCHITECT WILL
ESTABLISH THE DATE OF SUBSTANTIAL COMPLETION, OR ADVISE CONTRACTOR OF WORK WHICH MUST BE PERFORMED PRIOR TO ESTABLISHING DATE; AND REPEAT INSPECTION WHEN REQUESTED AND ASSURED THAT WORK HAS BEEN SUBSTANTIALLY COMPLETED. RESULTS OF COMPLETED INSPECTION WILL FORM INITIAL "PUNCH- LIST" FOR FINAL ACCEPTANCE.
03 30 - CAST-IN-PLACE CONCRETE
1. SEE STRUCTURAL DRAWINGS FOR CONCRETE AND STEEL REINFORCEMENT SPECIFICATIONS.
2. EXTEND VAPOR RETARDER TO EXTREMITIES OF AREAS TO BE PROTECTED FROM VAPOR TRANSMISSION. PLACE, PROTECT AND REPAIR ACCORDING TO ASTM E1643 AND MANUFACTURER'S WRITTEN INSTRUCTIONS.
3. CLEAN REINFORCEMENT OF LOOSE RUST, MILL SCALE, EARTH, ICE AND OTHER FOREIGN MATERIALS.
4. SET WIRE TIES WITH ENDS DIRECTED INTO CONCRETE, NOT TOWARD EXPOSED CONCRETE SURFACES.
5. CONSTRUCT JOINTS TRUE TO LINE WITH FACES PERPENDICULAR TO SURFACE PLANE.
6. CONSTRUCT CONTRACTION JOINTS A DEPTH EQUAL TO AT LEAST 1/4 OF CONCRETE THICKNESS. TOOLED JOINTS SHALL HAVE A 1/8" RADIUS EDGES. ELIMINATE GROOVER TOOL MARKS. CUT SAWN JOINTS 1/8" WIDE WHEN
CUTTING ACTION WILL NOT TEAR, ABRADE, OR OTHERWISE DAMAGE SURFACE AND BEFORE CONCRETE DEVELOPS RANDOM CONTRACTION CRACKS.
7. AT ISOLATION JOINTS, INSTALL JOINT-FILLER STRIPS AT SLAB JUNCTIONS WITH VERTICAL SURFACES, SUCH AS COLUMN PEDESTALS, FOUNDATION WALLS, GRADE BEAMS, AND OTHER LOCATIONS.
8. PRIOR TO PLACING CONCRETE, VERIFY THAT INSTALLATION OF FORMWORK, REINFORCEMENT, AND EMBEDDED ITEMS ARE COMPLETE.
9. FINISH CONCRETE SURFACES TRUE TO LEVEL OR SLOPED WHERE SHOWN ON PLANS WITH A SURFACE SUITABLE TO RECEIVE FINISH MATERIALS.
10. PROTECT FRESHLY PLACED CONCRETE FROM PREMATURE DRYING AND EXCESSIVE COLD OR HOT TEMPERATURES. COMPLY WITH ACI 306.1 FOR COLD WEATHER PROTECTION AND ACI 305R FOR HOT WEATHER PROTECTION.
11. PATCH AND REPAIR DEFECTIVE AREAS WHEN APPROVED BY OWNER. REMOVE AND REPLACE CONCRETE THAT CANNOT BE PATCHED OR REPAIRED.
GENERAL NOTES
1. THE SCOPE OF THESE DRAWINGS IS A "BUILDER'S SET" OF PLANS. THESE DRAWINGS ARE SUFFICIENT TO
OBTAINING A BUILDING PERMIT, WHICH MEANS THAT NOT NECESSARILY ALL MATERIALS AND METHODS OF CONSTRUCTION ARE DESCRIBED IN THE DRAWINGS. THE SUCCESSFUL IMPLEMENTATION OF THESE DRAWINGS
REQUIRES A CLIENT, A CONTRACTOR AND SUBCONTRACTORS SUFFICIENTLY KNOWLEDGEABLE OF APPLICABLE CODES AND METHODS OF CONSTRUCTION. THE DRAWINGS DEPICT LOCATIONS, DIMENSIONS, TYPES OF MATERIALS AND GENERAL METHODS OF FASTENING. THEY ARE NOT INTENDED TO SPECIFY EVERY PARTICULAR PRODUCT OR METHOD.
2. DETAILS AND NOTATIONS OF DRAWINGS ARE INTENDED TO INDICATE TYPICAL CONDITIONS AND REQUIREMENTS.
NOT ALL VARIATIONS AND FIELD CONDITIONS ARE NECESSARILY INDICATED ON DRAWINGS. PRIOR TO START OF
WORK, CONTRACTOR SHALL EXAMINE ALL EXISTING AND NEW CONDITIONS AND REQUIREMENTS, IDENTIFY AND
COORDINATE WHERE MINOR VARIATIONS ARE NECESSARY TO PROPERLY COMPLETE THE WORK, AND EXECUTE SAME AT NO EXTRA COST TO OWNER.
3. NOTHING IN THESE DRAWINGS OR SPECIFICATIONS IS INTENDED TO PERMIT WORK IN VIOLATION OF GOVERNING CODES. IF ANY CONFLICTS BECOME APPARENT, OBTAIN CLARIFICATION FROM THE ARCHITECT. DO NOT PROCEED WITH ANY RELATED WORK UNTIL SUCH CONFLICTS HAVE BEEN RESOLVED.
4. IF DISCREPANCIES ARE FOUND IN THESE PLANS OR IF THERE ARE ANY QUESTIONS REGARDING THESE PLANS, CONTACT THE ARCHITECT.
5. SHOULD ANY CONFLICT BE FOUND IN OR BETWEEN DRAWINGS AND SPECIFICATIONS, THE ARCHITECT SHALL BE THE SOLE JUDGE AS TO WHICH PROVISION PREVAILS. THE CONTRACTOR SHALL BE DEEMED TO HAVE ESTIMATED
BASED ON THE MOST EXPENSIVE METHOD, THE MORE STRINGENT PROVISION, THE BETTER QUALITY, AND THE GREATER QUANTITY OF WORK.
6. WHEN USED IN THE CONTRACT DOCUMENTS, THE TERM "CONTRACTOR" SHALL BE UNDERSTOOD TO MEAN THE GENERAL CONTRACTOR AND SUBCONTRACTORS.
7. BEFORE COMMENCING WORK, FILE ALL REQUIRED CERTIFICATES OF INSURANCE WITH THE APPLICABLE DEPARTMENTS, OBTAIN ALL REQUIRED PERMITS, AND PAY ALL FEES REQUIRED BY GOVERNING AGENCIES.
8. OBTAIN AND PAY FOR PERMITS, INSPECTIONS, EXAMINATIONS, AND FEES OR CHARGES NECESSARY FOR COMPLETION OF THE WORK. THE COST OF OBTAINING PERMITS SHALL BE INCLUDED ON THE BID.
9. FILE ALL NECESSARY CERTIFICATES OF INSURANCE WITH THE LOCAL GOVERNING AUTHORITIES, PAY ALL FEES,
PROVIDE ANY AND ALL BONDS REQUIRED BY ANY LOCAL AGENCY IN ORDER TO ACCOMPLISH THE WORK HEREIN DESCRIBED.
10. ALL WORK SHALL BE IN ACCORDANCE WITH ALL GOVERNING LOCAL AUTHORITIES, CODES, AND REGULATIONS.
11. ALL NEW MECHANICAL, ELECTRICAL AND PLUMBING WORK SHALL BE CONCEALED WITHIN EXISTING OR NEW CONSTRUCTION, UNLESS OTHERWISE NOTED.
12. ENSURE THAT ALL PLUMBING, ELECTRICAL, MECHANICAL, AND FIRE CONTROL WORK IS PERFORMED BY PERSONS LICENSED IN THEIR TRADES AND THAT ALL REQUIRED INSPECTIONS AND SIGN-OFFS ARE OBTAINED.
13. BE FAMILIAR WITH THE VARIOUS TRADE ASSOCIATION MANUALS, TESTING STANDARDS AND PUBLICATIONS REFERRED TO IN THE SPECIFICATIONS.
14. AIA DOCUMENT A201, GENERAL CONDITIONS FOR THE CONTRACT FOR CONSTRUCTION, IS CONSIDERED PART OF
THIS CONTRACT WHETHER OR NOT IT IS IDENTIFIED IN THE AGREEMENT BETWEEN THE OWNER AND THE CONTRACTOR.
15. A COPY OF THE PLANS, STAMPED AND APPROVED BY THE BUILDING DEPARTMENT, SHALL BE ON THE PREMISES AT ALL TIMES AND AVAILABLE FOR INSPECTORS, OWNER AND ARCHITECT.
16. THE ENTIRE SET OF DRAWINGS ARE COMPLEMENTARY AND ARE NECESSARY TO CONSTRUCT THE PROJECT.
THE CONTRACTOR SHALL CAREFULLY STUDY AND COMPARE AND UNDERSTAND HOW ALL THE DISCIPLINES WORK TOGETHER TO PRODUCE THE FINAL PRODUCT. DO NOT RELY ONLY ON ONE DISCIPLINE. 00 00 - PROCUREMENT AND CONTRACTING
1. ALL CONTRACTORS SHALL VISIT AND EXAMINE THE JOBSITE, AND BECOME FAMILIAR WITH THE EXISTING CONDITIONS PRIOR TO BID SUBMISSION. LATER CLAIMS FOR WORK OR FOR DIFFICULTIES WHICH COULD HAVE BEEN FORESEEN HAD AN EXAMINATION BEEN MADE, WILL NOT BE RECOGNIZED.
2. BY SIGNING THE CONTRACT FOR CONSTRUCTION THE CONTRACTOR ACKNOWLEDGES THAT SUFFICIENT INFORMATION IS PROVIDED IN THESE PLANS TO CONSTRUCT THE PROJECT. 01 00 - FRANCHISE AND BRAND REQUIREMENTS
1. COMPLIANCE WITH BRAND STANDARDS IS REQUIRED. BRAND STANDARDS MAY CHANGE DURING THE COURSE OF THE PROJECT AND THE CONTRACTOR WILL BE HELD TO THE MOST CURRENT BRAND STANDARDS.
2. THE BRAND STANDARDS ARE AVAILABLE AT: [ BRAND WEB SITE ]
3. DURING THE COURSE OF CONSTRUCTION, A REPRESENTATIVE OF THE BRAND WILL VISIT THE PROJECT SITE SEVERAL TIMES. THIS REPRESENTATIVE WILL BE REVIEWING THE PROJECT FOR COMPLIANCE WITH THE BRAND STANDARDS. DEFICIENCIES WILL BE NOTED. THE CONTRACTOR WILL BE REQUIRED TO REMEDY ANY DEFICIENCIES AT HIS OWN EXPENSE.
4. FRANCHISE REQUIRED SUBMITTALS PREPARED BY THE CONTRACTOR OR SUBCONTRACTOR ARE TO BE
SUBMITTED TO THE FRANCHISE BY THE CONTRACTOR OR SUBCONTRACTORS AND COPIED TO THE ARCHITECT AND OWNER.
01 11 - SUMMARY OF WORK
1. THE WORK OF THIS CONTRACT COMPRISES THE GENERAL CONSTRUCTION REQUIRED TO CONSTRUCT A NEW (PROJECT) IN THE CITY AND STATE INDICATED ON THE COVER SHEET OF THESE PLANS.
2. THE WORK INCLUDES, BUT IS NOT LIMITED TO, SITE, ARCHITECTURAL, STRUCTURAL, MECHANICAL, PLUMBING AND ELECTRICAL SYSTEMS, AND THE INSTALLATION OF FURNITURE, FIXTURES AND EQUIPMENT (FF&E).
3. THE WORK OF THE PROJECT IS SHOWN IN THE DRAWINGS AND DESCRIBED IN THE VARIOUS SECTIONS OF THESE SPECIFICATIONS.
4. LIMIT USE OF THE PREMISES TO CONSTRUCTION ACTIVITIES. CONFINE OPERATIONS TO AREAS WITHIN CONTRACTED LIMITS.
5. KEEP DRIVEWAYS AND ENTRANCES SERVING THE PREMISES CLEAR AND AVAILABLE TO OWNER AT ALL TIMES. DO NOT USE THESE AREAS FOR STORAGE OF MATERIALS. SCHEDULE DELIVERIES TO MINIMIZE SPACE AND TIME REQUIREMENTS FOR STORAGE OF MATERIALS AND EQUIPMENT.
6. THE CONTRACTOR IS RESPONSIBLE FOR THE PROTECTION AND SAFE KEEPING OF MATERIALS AND EQUIPMENT STORED ON SITE.
01 26 - CONTRACT MODIFICATIONS PROCEDURE
1. MAINTAIN DETAILED RECORDS OF WORK DONE ON A TIME AND MATERIAL BASIS. PROVIDE FULL INFORMATION REQUIRED FOR EVALUATION OF PROPOSED CHANGES, AND TO SUBSTANTIATE COSTS OF CHANGES IN THE WORK.
2. DOCUMENT EACH QUOTATION FOR A CHANGE IN COST OR TIME WITH SUFFICIENT TIME TO ALLOW EVALUATION.
ON REQUEST, PROVIDE ADDITIONAL INFORMATION TO SUPPORT COMPUTATIONS.
3. FOR EACH CHANGE, FURNISH A DETAILED WRITTEN PROPOSAL ITEMIZED ACCORDING TO GENERAL CONDITIONS, ARTICLE 7.
4. CONDITIONS REQUIRING CLARIFICATION SHALL BE ADDRESSED IN REQUESTS FOR INFORMATION (RFI). SUBMIT RFIs FROM THE CONTRACTOR'S OFFICE OR FIELD OFFICE ONLY. RFIs FROM SUBCONTRACTORS OR SUPPLIERS WILL NOT BE ACCEPTED.
5. ARCHITECT'S OR CONSULTANTS' RESPONSE SHALL NOT BE CONSTRUED AS A CHANGE ORDER OR CHANGE DIRECTIVE, NOR DOES IT AUTHORIZE CHANGES IN THE CONTRACT SUM OR CONTRACT TIME.
6. SUBMIT RFIs ON CONTRACTOR'S TYPICAL RFI FORM. IF A WEB-BASED PROJECT MANAGEMENT TOOL IS USED, ALL RFIs SHALL HAVE AT LEAST ONE DOWNLOADABLE ATTACHMENT.
7. THE ARCHITECT WILL ADVISE OF MINOR CHANGES IN THE WORK NOT INVOLVING AN ADJUSTMENT TO CONTRACT
SUM OR CONTRACT TIME, AS AUTHORIZED BY THE OWNER/ARCHITECT AGREEMENT, BY ISSUING SUPPLEMENTAL INSTRUCTIONS.
8. THE ARCHITECT MAY ISSUE SUPPLEMENTAL INSTRUCTIONS WHICH INCLUDE A DETAILED DESCRIPTION OF A PROPOSED CHANGE WITH SUPPLEMENTARY OR REVISED DRAWINGS AND SPECIFICATIONS. CONTRACTOR WILL PREPARE AND SUBMIT AN ESTIMATE WITHIN 10 DAYS.
9. THE CONTRACTOR MAY PROPOSE A CHANGE BY SUBMITTING A REQUEST FOR CHANGE TO THE OWNER'S
REPRESENTATIVE, DESCRIBING THE PROPOSED CHANGE AND ITS FULL EFFECT ON THE WORK, A DESCRIPTION OF
THE REASON FOR THE CHANGE, AND THE EFFECT ON THE CONTRACT SUM AND CONTRACT TIME WITH FULL DOCUMENTATION AND A DESCRIPTION OF THE EFFECT ON THE WORK BY SEPARATE OR OTHER CONTRACTORS.
DOCUMENT REQUESTED SUBSTITUTIONS IN ACCORDANCE WITH SECTION 01 33 00.
10. FOR ALLOWANCE-COST ADJUSTMENT, BASE EACH CHANGE OF CONTRACT PROPOSAL ON THE DIFFERENCE
BETWEEN THE ACTUAL PURCHASE AMOUNT AND THE ALLOWANCE, MULTIPLIED BY THE FINAL MEASUREMENT OF WORK-IN-PLACE. WHERE APPLICABLE, INCLUDE REASONABLE ALLOWANCES FOR CUTTING LOSSES, TOLERANCES, MIXING WASTES, NORMAL PRODUCT IMPERFECTIONS, AND SIMILAR MARGINS.
11. SUBMIT CLAIMS FOR INCREASED COSTS BECAUSE OF A CHANGE IN SCOPE OR NATURE OF THE ALLOWANCE
DESCRIBED IN THE CONTRACT DOCUMENTS, WHETHER FOR THE PURCHASE ORDER AMOUNT OR THE CONTRACTOR'S HANDLING, LABOR, INSTALLATION, OVERHEAD, AND PROFIT. SUBMIT CLAIMS WITHIN 21 DAYS OF RECEIPT OF THE CHANGE OF CONTRACT AUTHORIZING WORK TO PROCEED. THE OWNER WILL REJECT CLAIMS SUBMITTED LATER THAN 21 DAYS.
12. PROMPTLY REVISE SCHEDULE OF VALUES AND APPLICATION FOR PAYMENT FORMS TO RECORD EACH AUTHORIZED CHANGE OF CONTRACT AS A SEPARATE LINE ITEM AND ADJUST THE CONTRACT SUM.
13. PROMPTLY REVISE PROGRESS SCHEDULES TO REFLECT ANY CHANGE IN CONTRACT TIME, REVISE SUB- SCHEDULES TO ADJUST TIMES FOR OTHER ITEMS OF WORK AFFECTED BY THE CHANGE, AND RESUBMIT. 01 33 - SUBMITTAL AND SUBSTITUTION PROCEDURE
1. SHOP DRAWINGS, PRODUCT DATA, SAMPLES AND SIMILAR SUBMITTALS ARE NOT CONTRACT DOCUMENTS. THEIR PURPOSE IS TO DEMONSTRATE HOW THE CONTRACTOR INTENDS TO CONFORM TO THE CONTRACT DOCUMENTS.
2. ARCHITECT AND CONSULTANT REVIEW OF SUBMITTALS IS FOR THE LIMITED PURPOSE OF CHECKING FOR
COMPLIANCE WITH THE CONTRACT DOCUMENTS, NOT FOR DETERMINING THE ACCURACY OR COMPLETENESS OF OTHER DETAILS SUCH AS DIMENSIONS AND QUANTITIES. SUCH REVIEW DOES NOT APPROVE SAFETY MEASURES OR CONSTRUCTION MEANS AND METHODS.
3. PREPARE A SUBMITTAL SCHEDULE FOR ARCHITECT'S REVIEW WITHIN 30 DAYS OF THE COMMENCEMENT OF CONSTRUCTION. NUMBER EACH SUBMITTAL. MAINTAIN THE SAME NUMBERING SCHEME FOR RESUBMITTALS, ADDING .1, .2, .3, ETC., AS NECESSARY.
4. ALL SUBMITTALS SHALL COME THROUGH THE CONTRACTOR. SUBMITTALS FROM ANY OTHER SOURCE WILL BE RETURNED WITH NO ACTION TAKEN.
5. SUBMITTALS SENT TO THE ARCHITECT FOR REVIEW SHALL BEAR A STAMP BY THE CONTRACTOR VERIFYING THE CONTRACTOR HAS:
A. REVIEWED AND APPROVED THE SUBMITTAL.
B. DETERMINED AND VERIFIED MATERIALS, FIELD MEASUREMENTS AND OTHER CRITERIA RELATED THERETO, OR WILL DO SO.
C. CHECKED AND COORDINATED THE INFORMATION CONTAINED WITHIN SUCH SUBMITTALS WITH THE WORK AND CONTRACT DOCUMENTS.
Scale
Set Date
Drawn By
Project Number
ALL DRAWINGS AND WRITTEN MATERIAL
APPEARING HEREIN CONSTITUTE ORIGINAL
AND UNPUBLISHED WORK OF THE
ARCHITECT AND MAY NOT BE DUPLICATED,
USED OR DISCLOSED WITHOUT WRITTEN
CONSENT OF ARCHITECT
SHEET NO.
12" = 1'-0"10/6/2025 10:58:14 AM
A0.1
Specifications
Hotel Investment Group
Santa Fe Place Multi-Family
Author
Oct. 6, 2025
992952 & 958 Postal Way, Vista, CA 92083
Hotel Circle North, Suite 200, San Diego, CA 92108
No. Description Date
05/26/2026
C11
Scale
Set Date
Drawn By
Project Number
ALL DRAWINGS AND WRITTEN MATERIAL
APPEARING HEREIN CONSTITUTE ORIGINAL
AND UNPUBLISHED WORK OF THE
ARCHITECT AND MAY NOT BE DUPLICATED,
USED OR DISCLOSED WITHOUT WRITTEN
CONSENT OF ARCHITECT
SHEET NO.
10/6/2025 10:58:18 AM
A0.2
CalGreen Mandatory
Measures
Hotel Investment Group
Santa Fe Place Multi-Family
Author
Oct. 6, 2025
992952 & 958 Postal Way, Vista, CA 92083
Hotel Circle North, Suite 200, San Diego, CA 92108
No. Description Date
05/26/2026
C11
Scale
Set Date
Drawn By
Project Number
ALL DRAWINGS AND WRITTEN MATERIAL
APPEARING HEREIN CONSTITUTE ORIGINAL
AND UNPUBLISHED WORK OF THE
ARCHITECT AND MAY NOT BE DUPLICATED,
USED OR DISCLOSED WITHOUT WRITTEN
CONSENT OF ARCHITECT
SHEET NO.
10/6/2025 10:58:22 AM
A0.3
CalGreen Mandatory
Measures
Hotel Investment Group
Santa Fe Place Multi-Family
Author
Oct. 6, 2025
992952 & 958 Postal Way, Vista, CA 92083
Hotel Circle North, Suite 200, San Diego, CA 92108
No. Description Date
05/26/2026
C11
UP
WD
WH
WH
FD
26.04 26.05
26.03 26.03
32.01 26.05 10.01
26.03 33.0233.01
26.04 26.05
26.03 33.05
33.04 33.03
33.06 26.05 33.09
33.07 33.08 33.07
26.02 26.05
33.06 26.0326.03
26.03 26.03
32.02 32.03
26.02 32.04
32.06 32.05
32.05 (E) TRASH
12.01 32.09
32.09 32.09
32.09 26.01
26.01 32.10
A1.1
5 A1.1
17 A1.2
5 A1.1
16 32.08
7 A1.1
TYP.
32.11 32.12
32.13 32.1432.13
32.13 32.13
32.13 32.06
BUILDING A
BUILDING B
SANTA FE PLACE
POSTAL W
AY
10.02 32.19
32.19 32.19
30' - 0"
30' - 0"
30' - 0"
30' - 0"
30' - 0"
10.03 32.21 32.21
A1.1
12 A1.1
21 32.22
32.23 (E) FIRE LANE
20' - 0"
(E) FIRE LANE
20' - 0"
SETBACK
41'-0".
A1.1
22 27.06
32.24 28.02
10.07 10.07
11' - 1" 11' - 1" 5' - 0" 12' - 0" 10' - 0"
(5) at 9'-9" +/- EA.
49' - 2"
(5) at 9'-9" +/- EA.
49' - 2"
(5) at 9'-9" +/- EA.
49' - 2"
(14) at 10'-0" EACH
140' - 0"
15 (8) at 10'-0" EACH
80' - 0"
(9) at 9'-8" EACH
87' - 0"
(7) at 9'-10" EACH
68' - 10"
4 2
(2) at 10'-0" EA.
20' - 0"
5 5 5
1 12
(4) at 10'-1" +/- EA.
40' - 6" 23' - 0"
(6) at 10'-0" EACH
60' - 0"
(E)
10' - 0"
18 9
27.09 18' - 0" 24' - 0" 18' - 0" 18' - 0" 24' - 0" 18' - 0" 18' - 0" 22'-9". 24' - 0" 18' - 0"
18' - 0"
18'-0".
18' - 0"
25'-5".17' - 0"2' - 8"
(E) FIRE LANE
20' - 0"
2 1/27/25
19' - 0"
2 2
WEST EAST 32.15
6 A1.1
2 3/12/25
10.05 2
3/12/25
3/4" SQUARE x 16 GA SMASH
POINT PICKETS AT 4-3/4" O.C.
1-1/2" SQUARE x 14 GA.
TOP RAIL
2-1/2" SQUARE x 14 GA. POSTS
8'-0" O.C. (TYPICAL)
12" DIAMETER x 24" DEEP
CONCRETE FOOTING (TYPICAL)
2 COATS OF PAINT, (TYPICAL)
PAINT COLOR TBD
O.C. TYP.
8'-0" NTS
6' - 2" VERIFY 4" 2' - 0"
7' - 0"
1-1/2" SQUARE x 14 GA.
BOTTOM RAIL
2% MAX SLOPE
CROSS SLOPE
2% MAX SLOPE
CROSS SLOPE
SMOOTH STEEL
KICK PLATE
10"
42"
WELDABLE GATE BOX WITH INTEGRAL STOP.
PROVIDE LOCKSET
EMBED STEEL POST
IN 12" DIA. x 24"
CONCRETE FOOTING
STEEL MESH AT GATE
& EXTEND 1' BOTH SIDES
1-1/2" SQUARE x 14 GA.
GATE FRAME
3/4" SQUARE x 16 GA.
SMASH POINT PICKETS
AT 4-3/4" O.C.
.
.
7' - 0"
MIN. CLR.
1' - 0"
MIN. CLEAR
2' - 0"
6' - 2" VERIFY 4" 2' - 0"
9' - 0" 5' - 0" 9' - 0"
32.05 32.06
32.20 32.19
18' - 0"
3' - 0"
32.18 (E) PLANTING AREA (E) PLANTING AREA
32.03 (E) FLARED
SIDES AT WALK,
TYPICAL
(E) BUILDING
3.01 ACCESSIBLE
PARKING
SIGNAGE1
A1.2
ACCESSIBLE
PARKING SIGNAGE,
WALL MOUNT
1 A1.2
32.25 32.20
9' - 0" 5' - 0"3' - 0"
18' - 0"
VERIFY
6' - 0"
6"4' - 0"6"
SLOPE DN
8.33% MAX
32.05 32.16
32.18 26.03
32.19 3.01
3.01 3.01 (E) PLANTING
AREA
(E) PLANTING
AREA
18' - 0"
3' - 0"
3' - 0"
3' - 0"
32.17 32.18
32.06 32.02
32.20 1
5' - 6"
3' - 6"
MIN. CLR.
2' - 0"
3.04 32.09
32.09 3.06 3.06
3.05 18"
4" 10" 4"
WHITE
PAINTED
STRIPES
32.12 32.03
32.20 5' - 0" 12' - 0"
4' - 0" 2' - 0" 18' - 0"
32.18 3' - 0"
4' - 0"
3' - 0"
27.09 Scale
Set Date
Drawn By
Project Number
ALL DRAWINGS AND WRITTEN MATERIAL
APPEARING HEREIN CONSTITUTE ORIGINAL
AND UNPUBLISHED WORK OF THE
ARCHITECT AND MAY NOT BE DUPLICATED,
USED OR DISCLOSED WITHOUT WRITTEN
CONSENT OF ARCHITECT
SHEET NO.
As indicated10/6/2025 10:58:31 AM
A1.1
Site Plan
Hotel Investment Group
Santa Fe Place Multi-Family
Author
Oct. 6, 2025
992952 & 958 Postal Way, Vista, CA 92083
Hotel Circle North, Suite 200, San Diego, CA 92108
1" = 20'-0"A1.1
10 Site
Keynotes
3.01 (E) 6" CONCRETE CURB
3.04 BACK OF (E) CONCRETE WALK
3.05 CONCRETE WALK
3.06 (E) CONCRETE WALK
10.01 (E) TOW-AWAY SIGNAGE
10.02 (E) TOW-AWAY SIGNAGE, REMOVE FROM POST AND FOOTING AND RELOCATE SIGN TO
NEW FENCE
10.03 MAILBOXES
10.05 KNOX KEY BOX. VERIFY MODEL AND MOUNTING LOCATION WITH FIRE DEPT
10.07 KNOX-VAULT SERIES 4400 KEY BOX, VERIFY FINAL LOCATION WITH FIRE DEPT.
RECESS MOUNT AT 5'-0" ABOVE STANDING SURFACE. PREMISES KEYS FOR ALL
BUILDING AREAS (GRAND MASTER SYSTEM KEYS) LABELED WITH APPROVED KEY
TAGS IDENTIFYING EACH DOOR OR AREA SERVED
12.01 BICYCLE PARKING, 8 BIKES
26.01 (E) ELECTRICAL SWITCHGEAR, PROTECT IN PLACE
26.02 (E) ELECTRICAL TRANSFORMER, PROTECT IN PLACE
26.03 (E) PARKING LIGHT POLE, SEE ELECTRICAL
26.04 (E) STREET LIGHT
26.05 (E) ELECTRICAL VAULT
27.06 27.09
28.02 AUTOMATIC GATES SHALL BE EQUIPPED WITH SENSORS CAPABLE OF DETECTING
EMERGENCY VEHICLE STROBE LIGHTS FROM ANY DIRECTION OF APPROACH (TOMAR "STROBESWITCH" OR APPROVED EQUAL) AND KNOX KEY-OPERATED ELECTRIC SWITCHES KEYED TO FIRE DEPT SPECIFICATIONS. BOTH THE STROBE DETECTOR AND
THE KEY SWITCH SHALL OVERRIDE ALL GATE FUNCTIONS AND OPEN THE GATE
32.01 (E) MONUMENT SIGN
32.02 ACCESSIBLE PATH STRIPING WITH STRIPES 3'-0" O.C., FEDERAL BLUE NO. 15090
32.03 (E) ACCESSIBLE PATH STRIPING WITH STRIPES 3'-0" O.C., REPAINT FEDERAL BLUE NO. 15090
32.04 CURB CUT AND RAMP FOR ACCESSIBLE ROUTE
32.05 (E) PAINTED ACCESSIBLE PARKING SYMBOL, REPAINT FEDERAL BLUE NO. 15090 WITH
WHITE BORDER
32.06 PAINTED ACCESSIBLE PARKING SYMBOL, FEDERAL BLUE NO. 15090 WITH WHITE BORDER
32.08 (E) VEHICULAR GATE, PROTECT IN PLACE
32.09 7'-0" HIGH PERIMETER FENCE, TUBULAR STEEL, PAINTED BLACK, MATCH DESIGN OF
VEHICULAR GATES
32.10 CONCRETE APRON
32.11 (E) CONCRETE WHEELSTOP
32.12 CONCRETE WHEELSTOP
32.13 (E) DOUBLE PARKING STRIPE WITH HALF-ROUND END, REPAINT WHITE PER DETAIL 11/A1.1
32.14 18" WIDE DOUBLE PARKING STRIPE WITH HALF-ROUND END, PAINT WHITE PER DETAIL 11/A1.1
32.15 PEDESTRIAN GATE, PAINTED TUBULAR STEEL, MATCH DESIGN OF VEHICULAR GATES
32.16 (E) PAINTED ACCESSIBLE AISLE 5'-0" WIDE WITH STRIPES 3'-0" O.C., REPAINT FEDERAL BLUE NO. 15090
32.17 PAINTED ACCESSIBLE AISLE 5'-0" WIDE WITH STRIPES 3'-0" O.C., FEDERAL BLUE NO. 15090
32.18 WHITE PAINTED LETTERS 12" HIGH
32.19 DETECTABLE WARNING
32.20 (E) SINGLE STRIPE, REPAINT FEDERAL BLUE NO. 15090
32.21 (E) CHAIN LINK GATES
32.22 GATE OPERATOR
32.23 (E) GATE CODE PEDESTAL, VERIFY LOCATION
32.24 REMOVE ALL (E) SPEED BUMPS AND/OR SPEED CONTROL DIPS THAT MAY INTERFERE
WITH EMERGENCY APPARATUS RESPONSES
32.25 SINGLE STRIPE, PAINT FEDERAL BLUE NO. 15090
33.01 (E) WATER METER
33.02 (E) BACK FLOW PREVENTER
33.03 (E) FIRE HYDRANT
33.04 (E) POST INDICATOR VALVE
33.05 (E) FIRE DEPARTMENT CONNECTION
33.06 (E) COMMUNICATIONS VAULT
33.07 (E) SEWER VAULT
33.08 (E) SEWER CLEANOUT
33.09 (E) UTILITIES VAULT
1/2" = 1'-0"A1.1
7 Perimeter Fence Metal
1/2" = 1'-0"A1.1
6 Perimeter Gate Metal
1/4" = 1'-0"A1.1
17 Accessible Parking 3
1/4" = 1'-0"A1.1
5 Accessible Parking 2
1/4" = 1'-0"A1.1
16 Accessible Parking 1
1/4" = 1'-0"A1.1
12 Postal Gate Plan
1 3/4" = 1'-0"A1.1
21 Typical Parking Stripe
1/4" = 1'-0"A1.1
22 Accessible Parking 4
2 NORTH
No. Description Date
1 Plan Check 1,
c
oordination
7/8/24
2 Coordination 3/12/25
05/26/2026
C11
5' - 0"12' - 8"MIN. CLEAR
5' - 0"
4.01 3.01
4.01 5-YARD BIN,
TYPICAL
9' - 4" 3' - 4" 1' - 4"
2 A1.2
26.03 6"6"
14' - 0"
5.07 22
A1.2
2 2
4.01 12.01
16 A1.2 5.06
4.01 12.01
A1.2
11 16
A1.2
4' - 3" 6' - 0"
3' - 2" 6' - 0"
4.01 12.01
16 A1.2
CENTER LINE WALL AND POST
CMU WALL PER PLAN
TUBE STEEL POST PER
STRUCTURAL
2" HEAVY DUTY HINGE
CONTINUOUSLY WELDED TO
GATE AND POST
16 GA. RIBBED
METAL GATE
L2x2x.25 STEEL
GATE FRAME
2"
42"
6' - 0"
2"
CONCRETE
BLOCK
ENCLOSURE
WELDABLE
GATE BOX WITH
INTEGRAL STOP
CORRRUGATED
METAL GATE,
MATCH TRASH
ENCLOSURE
GATES
3/16"
3" 3" 1 1/2"
7 1/2"
3" 3" 1 1/2"
5/8" DIA.
ANCHORS
1/4" THICK STEEL
BASE PLATE
STEEL POST
PER PLAN
7 1/2"
5 1/2" 2"
5 1/2" 2"
11 A1.2
3 3/16"
5/8" DIA. THREADED ROD WITH 3" MIN. EMBED.
INSTALL WITH SIMPSON ET-3G EPOXY (ICC
ESR-5309). SPECIAL INSPECTION REQUIRED
CMU CAP
STEEL BASE PLATE
PER PLAN
HSS4x4X1/4, PAINTED
MIN.
3"HEIGHT PER ELEVATIONS
1000S162-54 ROOF
JOISTS, PAINTED
METAL ROOF DECK PER
ROOF PLAN, PAINTED
(3) #10 HEX HEAD SELF
DRILLING ZINC SCREWS
3 #12 HEX HEAD SELF-DRILLING ZINC SCREWS
WITH HPDM WASHER 16" O.C. MAX.
3 FINISH GRADE
DOOR JAMB POST TO BE
EMBEDDED IN CONCRETE
AS SHOWN
1' - 6"
36".
1"
6" 3" 3"
3/4" SOLID SLIDE BOLT1" PIPE TYP.
DOOR DOOR
2' - 6"
4" 4"
SEE PLAN
MIN.
6"
2" CMU CAP
(2) #4 HORIZONTAL AT TOP
#4 VERTICAL 24" O.C.
#4 HORIZONTAL 24" O.C.
SPLIT FACE EXTERIOR
PRECISION FACE INTERIOR
4" CONCRETE SLAB
12"
3"
3"
2500 PSI CONCRETE
FOOTING WITH (3) #4
1/2" ROUND CORNERS
MIN. LAP
2' - 0"
#4 VERTICAL 24" O.C. WITH
ALTERNATING BENDS INTO
CONCRETE FOOTING
GRADE
8x8x16 INTEGRAL COLOR CMU,
COLOR PER ELEVATIONS
6' - 0"
MIN.
1' - 8"
9"
1' - 0" 80" ABOVE FINISH GRADE
PARKING ONLY
MINIMUM FINE
$250
VAN ACCESSIBLE
1" HIGH
LETTERING
ALL DISABLED PARKING SIGNS SHALL CONFIRM TO CALIFORNIA MANUAL OF UNIFORM TRAFFIC CONTROL DEVICES, SIGNS R99(CA) AND R100B(CA)
WHITE SYMBOL OF
ACCESSIBILITY ON DARK
BLUE BACKGROUND
70" SQ. IN. MIN. GALV.
SIGN W/ REFLECTIVE
PAINT
ADDITIONAL SIGN AT VAN
ACCESSIBLE SPACE
2" X 2" X 1/4" PAINTED
GALVANIZED STEEL TUBE SET
INTO CONCRETE (POST NOT
REQUIRED AT WALL)
11 1/2"
COLD FORMED
CLOSURE PANEL
METAL ROOF DECK
PER ROOF PLAN
METAL ROOF JOIST
PER DETAIL
1000C250-54
RIM JOIST
COLD FORMED
CLOSURE PANEL
CORRUGATED
ROOF DECK
1000C250-54
RIM JOIST
COLD FORMED
CLOSURE PANEL
1000C250-54
RIM JOIST
#12 HEX HEAD SELF-
DRILLING ZINC
SCREWS WITH HPDM
WASHER 16" O.C. MAX.
#12 HEX HEAD SELF-
DRILLING ZINC
SCREWS WITH
HPDM WASHER 16"
O.C. MAX., TYPICAL
AT ROOF DECK TO
FRAMING
3 3
4.01 5.06
5.07 22
A1.2
2 A1.2 1" / 1'-0"
2' - 0"
2' - 0"
2' - 0"
2' - 0"
5.06 3
6" DIA. PIPE BOLLARD,
SCHEDULE 80, FILL
WITH CONCRETE
3' - 0" 3' - 0"
CONCRETE FOOTING
6"
DIAMETER
18"
3"
CONCRETE SLAB
Scale
Set Date
Drawn By
Project Number
ALL DRAWINGS AND WRITTEN MATERIAL
APPEARING HEREIN CONSTITUTE ORIGINAL
AND UNPUBLISHED WORK OF THE
ARCHITECT AND MAY NOT BE DUPLICATED,
USED OR DISCLOSED WITHOUT WRITTEN
CONSENT OF ARCHITECT
SHEET NO.
As indicated10/6/2025 10:58:52 AM
A1.2
Site Details
Hotel Investment Group
Santa Fe Place Multi-Family
Author
Oct. 6, 2025
992952 & 958 Postal Way, Vista, CA 92083
Hotel Circle North, Suite 200, San Diego, CA 92108
1/4" = 1'-0"A1.2
5 Trash Enclosure Plan
1/4" = 1'-0"A1.2
18 Trash East Elevation
1/4" = 1'-0"A1.2
13 Trash North Elevation
1/4" = 1'-0"A1.2
3 Trash South Elevation
1/4" = 1'-0"A1.2
8 Trash West Elevation
Keynotes
3.01 (E) 6" CONCRETE CURB
4.01 8" SPLIT FACE CONCRETE BLOCK, PRECISION INTERIOR FACE,
ANGELUS BLOCK, TAN, OR APPROVED EQUAL
5.06 VERCO B-DECK OR APPROVED EQUAL. PAINT BROWN, SHERWIN WILLIAMS SW 6173, SEMI-GLOSS
5.07 6" DIAMETER PIPE BOLLARD IN CONCRETE FOOTING, FILL PIPE
WITH CONCRETE
12.01 BICYCLE PARKING, 8 BIKES
26.03 (E) PARKING LIGHT POLE, SEE ELECTRICAL
1 1/2" = 1'-0"A1.2
7 Trash Gate Post
1/2" = 1'-0"A1.2
6 Trash Enclosure Man Gate Elevation
3" = 1'-0"A1.2
12 Trash Enclosure Post Base Plate
1 1/2" = 1'-0"A1.2
11 Trash Enclosure Post Elevation
1 1/2" = 1'-0"A1.2
21 Trash Enclosure Post Footing
1 1/2" = 1'-0"A1.2
17 Trash Enclosure Slide Bolt
3/4" = 1'-0"A1.2
20 Trash Enclosure Wall Section
1 1/2" = 1'-0"A1.2
1 Accessible Parking Signage
1 1/2" = 1'-0"A1.2
16 Roof Edge
1/4" = 1'-0"A1.2
2 Trash Section
1/4" = 1'-0"A1.2
10 Trash Enclosure Roof Plan
3/4" = 1'-0"A1.2
22 Pipe Bollard
No. Description Date
2 Coordination 3/12/25
3 Fire Dept, SDG&E,
Owner, Coord.
7/30/25
05/26/2026
C11
Door Notes
1. ALL EGRESS DOOR OPERATION SHALL COMPLY WITH CBC 1010.1.9 THROUGH 1010.1.9.12.
2. EXCEPT AS PERMITTED BY CBC 1010.1.9 EGRESS DOORS SHALL BE READILY OPENABLE
FROM THE EGRESS SIDE WITHOUT THE USE OF A KEY OR SPECIAL KNOWLEDGE OR EFFORT.
3. DOORS FROM INDIVIDUAL DWELLING OR SLEEPING UNITS OF GROUP R OCCUPANCIES HAVING AN OCCUPANT LOAD OF 10 OR LESS ARE PERMITTED TO BE EQUIPPED WITH A
NIGHT LATCH, DEAD BOLT OR CHAIN, PROVIDED SUCH DEVICES ARE OPENABLE FROM THE INSIDE WITHOUT THE USE OF A KEY OR TOOL (CBC 1010.1.9.4.4).
4. WHERE EGRESS DOORS ARE USED IN PAIRS, APPROVED AUTOMATIC FLUSH BOLTS
SHALL BE PERMITTED TO BE USED, PROVIDED THAT THE DOOR LEAF HAVING THE
AUTOMATIC FLUSH BOLTS HAS NO DOORKNOB OR SURFACE-MOUNTED HARDWARE (1010.1.9.4.3).
5. IN OCCUPANCY GROUP A HAVING AN OCCUPANT LOAD OF 300 OR LESS AND GROUP B
THE MAIN EXTERIOR DOOR OR DOORS ARE PERMITTED TO BE EQUIPPED WITH KEY- OPERATED LOCKING DEVICES FROM THE EGRESS SIDE PROVIDED: THE LOCKING
DEVICE IS READILY DISTINGUISHABLE AS LOCKED AND A READILY VISIBLE DURABLE SIGN IS POSTED ON THE EGRESS SIDE ON OR ADJACENT TO THE DOOR STATING: "THIS DOOR TO REMAIN UNLOCKED WHEN BUILDING IS OCCUPIED." THE SIGN SHALL BE IN LETTERS 1 INCH HIGH ON A CONTRASTING BACKGROUND.
6. THE USE OF THE KEY-OPERABLE LOCKING DEVICE MUST BE REVOCABLE BY THE BUILDING OFFICIAL FOR DUE CAUSE (CBC 1010.1.9.4.2.3).
7. MANUALLY OPERATED FLUSH BOLTS OR SURFACE BOLTS ARE NOT PERMITTED (CBC 1010.1.9.5).
8. ALL PIN-TYPE DOOR HINGES ACCESSIBLE FROM THE OUTSIDE SHALL HAVE NONREMOVABLE HINGE PINS. HINGES SHALL HAVE MIN. 1/4" DIA. STEEL JAMB STUD WITH 1/4" MIN. PROTECTION.
9. THE STRIKE PLATE FOR LATCHES AND HOLDING DEVICE FOR PROJECTING DEAD BOLTS
IN WOOD CONSTRUCTION SHALL BE SECURED TO THE JAMB AND THE WALL FRAMING WITH SCREWS NO LESS THAN 2-1/2" LONG.
10. CYLINDER GUARDS SHALL BE INSTALLED ON ALL CYLINDER LOCKS WHENEVER THE
CYLINDER PROJECTS BEYOND THE FACE OF THE DOOR OR IS OTHERWISE ACCESSIBLE TO GRIPPING TOOLS.
11. WOOD DOORS SHALL BE 1-3/4" MIN. THICK WITH SOLID CORE CONSTRUCTION. HOLLOW METAL DOORS SHALL BE MIN. 16 GAUGE STEEL. DOOR STOPS AT IN-SWINGING DOORS
SHALL BE OF ONE-PIECE CONSTRUCTION WITH THE JAMB OR JOINED BY RABBET TO THE JAMB.
12. ALL GLASS OVER 9 SQUARE FEET IN AREA WITHIN 18" OF FLOOR OR 36" OF GRADE, AND
GLASS DOORS AND WALL PANELS SHALL BE LAMINATED OR FULLY TEMPERED (CBC 2406.4.3).
13. ALL GLAZING SHALL COMPLY WITH CBC SECTION 2400
14. DOOR HANDLES, PULLS, LATCHES, LOCKS AND OTHER OPERATING DEVICES SHALL BE INSTALLED 34 INCHES MINIMUM AND 44 INCHES MAXIMUM ABOVE THE FINISHED FLOOR.
CBC 11B-404.2.7. LOCKS USED ONLY FOR SECURITY PURPOSES AND NOT USED FOR NORMAL OPERATION ARE PERMITTED AT ANY HEIGHT. CBC 1010.1.9.2
15. DOOR AND WINDOW MANUFACTURERS SHALL PROVIDE A CERTIFICATE OF COMPLIANCE FOR ALL EXTERIOR DOORS AND WINDOWS INDICATING COMPLIANCE WITH TITLE 24.
16. CONTRACTOR SHALL FULLY INSULATE ALL DOORS, WINDOWS, AND OTHER JOINTS IN THE EXTERIOR WALLS IN COMPLIANCE WITH TITLE 24.
17. MAXIMUM EFFORT TO OPERATE DOORS SHALL NOT EXCEED 5 LBF FOR EXTERIOR AND
INTERIOR DOORS, SUCH PULL OR PUSH EFFORT BEING APPLIED AT RIGHT ANGLES TO HINGED DOORS AND AT THE CENTER PLANE OF SLIDING OR FOLDING DOORS.
COMPENSATING DEVICES OR AUTOMATIC DOOR OPERATORS MAY BE UTILIZED TO MEET THE ABOVE STANDARDS. WHEN FIRE DOORS ARE REQUIRED, THE MAXIMUM EFFORT
TO OPERATE THE DOOR MAY BE INCREASED TO THE MINIMUM ALLOWED BY THE APPROPRIATE ADMINISTRATIVE AUTHORITY, NOT TO EXCEED 15 LBF. CBC 11B-404.2.9
18. LABELED PROTECTIVE ASSEMBLIES: FIRE DOOR ASSEMBLIES SHALL BE LABELED BY AN APPROVED AGENCY. THE LABELS SHALL COMPLY WITH NFPA 80, AND SHALL BE PERMANENTLY AFFIXED TO THE DOOR OR FRAME. CBC 716.3.5
19. DOOR HARDWARE SHALL NOT REQUIRE TIGHT GRASPING, TIGHT PINCHING OR TWISTING OF THE WRIST (CBC 1010.1.9.1). THE UNLATCHING OF ANY DOOR OR LEAF, EXCEPT AT GUEST ROOMS, SHALL NOT REQUIRE MORE THAN ONE OPERATION. CBC 1010.1.9.3 ITEM 4, 1010.1.9.5 EXCEPTION 4
20. SUBMIT MANUFACTURER'S INSTALLATION INSTRUCTIONS FOR FIRE DOORS TO THE BUILDING INSPECTOR. CBC 716
21. MINIMUM DOOR WIDTH FOR HUMAN PASSAGE SHALL BE NOT LESS THAN 32 INCHES CLEAR. CBC 1010.1.1
22. NO FLOOR MOUNTED DOOR STOPS ARE PERMITTED
23. FIRE DOOR ASSEMBLIES IN EXIT ENCLOSURES AND EXIT PASSAGEWAYS SHALL HAVE A MAXIMUM TRANSMITTED TEMPERATURE END POINT OF NOT MORE THAN 450 DEGREES (F) ABOVE AMBIENT AT THE END OF 30 MINUTES OF STANDARD FIRE TEST EXPOSURE.
MAXIMUM TRANSMITTED TEMPERATURE RISE IS NOT LIMITED IF EQUIPPED
THROUGHOUT WITH AN AUTOMATIC SPRINKLER SYSTEM INSTALLED IN ACCORDANCE WITH CBC 903.3.1.1 (CBC 716.3.4)
24. STOREFRONT DOOR STILES SHALL BE WIDE (6" NOMINAL, 5-1/2" MIN). WIDER STILES MAY BE REQUIRED WHERE CARD READERS ARE MOUNTED ON DOORS.
25. DOOR HARDWARE, COLOR, AND FINISH SHALL COORDINATE WITH INTERIOR DESIGN THEME.
26. FIRE DOOR ASSEMBLIES REQUIRED TO HAVE A MINIMUM FIRE PROTECTION RATING OF 1/3 HOUR WHERE LOCATED IN CORRIDOR WALLS OR SMOKE BARRIER WALLS WITH A FIRE-RESISTANCE RATING PER TABLE 716.5 SHALL BE TESTED IN ACCORDANCE WITH NFPA 252 OR UL 10C WITHOUT HOSE STREAM TEST. CBC 716.3.4
27. FIRE DOORS SHALL BE SELF- OR AUTOMATIC-CLOSING AND SHALL BE EQUIPPED WITH A LATCH TO SECURE THE DOOR IN THE CLOSED POSITION. CBC 716.2.6.1 AND 716.2.6.2
28. FIRE DOORS, FRAMES, HARDWARE, AND ACCESSORIES THAT COMPRISE A FIRE DOOR ASSEMBLY SHALL BE LISTED FOR USE IN SUCH INSTALLATIONS. WHERE PANIC HARDWARE IS NOTED IN SCHEDULE IT SHALL BE FIRE EXIT HARDWARE.
29. AUTOMATIC SLIDING/BREAKAWAY DOORS SHALL BE STANLEY ACCESS DURA-GLIDE, ICC- ESR 1751, OR APPROVED EQUAL AND SHALL COMPLY WITH CBC 1010.1.4.3
30. GLASS COLOR OF ENTRANCE DOORS AND FINISH OF ALUMINUM STOREFRONTS PER
BUILDING ELEVATION DRAWINGS
31. PROVIDE ACCESSIBLE REMOTE CARD READERS AT ALL EXTERIOR ENTRANCE DOORS,
INCLUDING MAIN ENTRY, FITNESS CENTER, BUSINESS CENTER, MEETING ROOMS,
GUEST LAUNDRY
32. DOOR FRAMES IDENTIFIED AS "KD" SHALL BE PREFINISHED TIMELY. DOOR FRAMES IDENTIFIED AS "HM" SHALL HAVE A PAINTED FINISH.
33. MEETING ROOMS MUST HAVE A TAMPER PROOF 1-WAY VIEWER LOOKING INTO MEETING ROOM
34. ALL CHANGES IN LEVEL AT FLOOR TRANSITION PERMITTED TO BE 1/4" MAXIMUM OR 1/2" W/ 1:2 SLOPE (TYPICAL ALL THRESHOLDS)
35. DOOR FRAMES SHALL HAVE SILENCER BUTTONS UNLESS GASKETS ARE SPECIFIED.
36. ALL EXTERIOR HOLLOW METAL DOORS AND FRAMES SHALL BE INSULATED.
37. FILL ALL VOIDS ON THRESHOLDS WITH SEALANT TO MATCH GROUT.
38. DOORS SERVING A GROUP A OCCUPANCY, OR AN ASSEMBLY AREA NOT CLASSIFIED AS AN ASSEMBLY OCCUPANCY, HAVING AN OCCUPANT LOAD OF 50 OR MORE SHALL NOT BE PROVIDED WITH A LATCH OR LOCK UNLESS IT IS PANIC OR FIRE EXIT HARDWARE.
CBC 1010.1.9.4
39. DOOR FRAME THROAT DIMENSIONS SHALL BE VERIFIED BY THE GENERAL CONTRACTOR AND DOOR SUBCONTRACTOR PRIOR TO PURCHASING.
1. FIELD VERIFY ALL DIMENSIONS BEFORE FABRICATION OF WINDOW FRAMING AND GLAZING.
2. ALL EXTERIOR WINDOWS TO BE 1" DOUBLE GLAZED CLEAR GLASS. WHERE ALUMINUM FRAMES ARE USED, USE THERMALLY BROKEN FRAMES.
3. DOUBLE INSULATED ROOM UNIT GLAZING SHOULD BE DESIGNED FLUSH TO THE EXTERIOR FRAME TO PREVENT WATER BUILD-UP AND DIRT RETENTION.
4. WINDOW UNITS MAY USE ANNEALED GLASS WHERE PERMITTED.
5. PROVIDE INSECT SCREEN FOR ALL OPERABLE WINDOWS.
6. ALL OPENABLE WINDOWS, ONCE OPENED, MUST REMAIN IN THE OPEN POSITION WITHOUT HAVING TO BE PROPPED OPEN. ALL WINDOW SECTIONS MUST MEET OR EXCEED AWMA SPECIFICATIONS FOR COMMERCIAL WINDOWS.
7. "T" INDICATES AREA OF TEMPERED (SAFETY) GLAZING.
8. ESCAPE OR RESCUE WINDOWS SHALL HAVE A MINIMUM NET CLEAR OPENABLE AREA OF 5.7 SQUARE FEET. THE MINIMUM NET CLEAR OPENABLE HEIGHT DIMENSION SHALL BE 24 INCHES. THE MINIMUM NET CLEAR OPENABLE WIDTH DIMENSION SHALL BE 20 INCHES. AS A MEANS OF ESCAPE OR RESCUE, THEY SHALL HAVE A BOTTOM OF CLEAR OPENING HEIGHT NOT MORE THAN 44 INCHES ABOVE THE FLOOR.
9. FOR TYPICAL WINDOW FLASHING, SEE DETAIL
10. SAFETY GLAZING IN COMPLIANCE WITH CBC SECTION 2406.1.1 THROUGH 2406.1.4 SHALL
BE PROVIDED WHERE HAZARDOUS CONDITIONS EXIST AS DEFINED BY CBC SECTION 2406.3.
11. ALL GLAZING SHALL COMPLY WITH THE REQUIREMENTS SET FORTH IN CBC CHAPTER
24. 12. ALL EXTERIOR GLAZING SYSTEMS SHALL BE DESIGNED TO RESIST WIND LOADS AS SPECIFIED IN CBC 2404 & 1609A.
13. DOOR AND WINDOW MANUFACTURERS SHALL PROVIDE A CERTIFICATE OF COMPLIANCE
FOR ALL EXTERIOR DOORS AND EXTERIOR WINDOWS INDICATING COMPLIANCE WITH TITLE 24.
14. CONTRACTOR SHALL FULLY INSULATE INSIDE AND OUT ALL DOORS, WINDOWS, THRU-
WALL FIBERGLASS HVAC WALL SLEEVES AND OTHER JOINTS IN THE EXTERIOR WALLS IN COMPLIANCE WITH TITLE 24.
15. ALL EXTERIOR WINDOW AND DOOR GLASS TO COMPLY WITH THE FOLLOWING REQUIREMENTS:
DUAL PANE, LOW E CLEAR GLAZING.
SHGC = 0.23 MAX.
U-FACTOR = 0.34 MAX.
16. RESERVED
17. WINDOW FRAMES SHALL BE VINYL, UNLESS NOTED OTHERWISE. COLOR TBD.
18. WINDOWS SHALL COMPLY WITH STC REQUIREMENTS IN THE PROJECT ACOUSTICAL REPORT.
19. RESERVED.
20. WIRES IN WIRE GLASS SHALL BE VERTICAL AND HORIZONTAL.
21. THE QUANTITY COLUMN IN THE WINDOW SCHEDULE IS A CONVENIENCE FOR THE CONTRACTOR. DO NOT RELY ON THE QUANTITIES SHOWN. VERIFY ALL QUANITITIES BEFORE ORDERING WINDOWS.
22. AT HORIZONTAL SLIDING WINDOWS, SEE FLOOR PLANS FOR HANDING. INTERIOR SASH IS OPERABLE.
Window Notes
/5 A3.2
2 2 12/18/24
2 2/25/25
2 12/30/24
1. ALL INTERIOR FINISHES SHALL BE CLASSIFIED IN ACCORDANCE WITH IBC 803 AND TABLE 803.9.
2. FINISH MATERIAL SHALL BE APPLIED DIRECTLY TO 1 OR 2 HOUR RATED WALL OR CEILING NON-COMBUSTIBLE CONSTRUCTION, OR TO FURRING STRIPS NOT EXCEEDING 1 3/4". THE
FURRED SPACE SHALL BE FILLED WITH INORGANIC OR CLASS I MATERIAL OR FIRE STOPPED NOT TO EXCEED 8' IN ANY DIRECTION.
3. FINISH MATERIALS SET OUT OR DROPPED MORE THAN 1 3/4" FROM FIRE-RATED WALLS OR CEILINGS SHALL BE CLASS I, OR SPRINKLERED ON BOTH SIDES, OR FURRING STRIPS.
4. HANGERS AND ASSEMBLY MEMBERS OF DROPPED CEILINGS BELOW A ONE-HOUR
CEILING ASSEMBLY SHALL BE NON-COMBUSTIBLE MATERIALS, OR FIRE-RETARDANT TREATED WOOD.
5. ALL INTERIOR WALL OR CEILING FINISHES LESS THAN 1/4" THICK SHALL BE APPLIED DIRECTLY AGAINST A NON-COMBUSTIBLE BACKING.
6. WALL AND CEILING MATERIALS SHALL NOT EXCEED THE FLAME SPREAD CLASSIFICATIONS IN THE IBC.
7. FINISHES IN ALL AREAS, OTHER THAN THE CUSTOMER WAITING OR DINING AREAS MUST BE SMOOTH, NONABSORBENT, EASILY CLEANABLE, DURABLE AND LIGHT IN COLOR. (NOTE: LIGHT COLORED IS DEFINED AS HAVING A LIGHT REFLECTANCE VALUE OF 70% OR GREATER.)
8. RESERVED
9. ALL INTERIOR FLOOR FINISHES ARE TO BE SLIP RESISTANT WITH LESS THAN OR EQUAL TO 0.6 FRICTION COEFFICIENT FACTOR.
10. RESERVED
11. THE FLAME SPREAD INDEX OF INTERIOR FINISHES IN SPRINKLERED BUILDINGS SHALL BE PROVIDED IN ACCORDANCE WITH IBC TABLE 803.9, AS FOLLOWS:
CLASS A - INT. EXIT STAIRWAYS, RAMPS, AND PASSAGES
CLASS B - CORRIDORS, LOBBIES, AND EXIT ACCESS ENCLOSURES
CLASS C - ROOMS AND CLOSED SPACES
12. OPAQUE ACRYLIC CORNER GUARDS ARE REQUIRED AT WALL DIRECTION CHANGES IN HIGH TRAFFIC AREAS. THEY MUST BE A SOLID COLOR TO MATCH THE WALLCOVERING AND MUST BE SELF-ADHESIVE. EXPOSED SCREWS OR OTHER FASTENER ARE NOT PERMITTED.
13. ALL WALL COVERING SHALL BE CLASS 'A' AND COMPLY WITH FEDERAL SPECIFICATIONS CCS 408A AND CFFA W101 A, B, & C.
14. ALL WALLCOVERING ADHESIVES SHALL BE STRIPPABLE AND SHALL CONTAIN MILDEW INHIBITORS.
15. CURTAINS, DRAPES AND OTHER DECORATIVE MATERIALS SUSPENDED FROM WALLS OR
CEILINGS SHALL MEET THE FLAME SPREAD PROPAGATION PERFORMANCE CRITERIA OF NFPA 701 IN ACCORDANCE WITH 806.2, OR BE NON-COMBUSTIBLE. IBC 806.1
16. FLOORING: LUXURY VINYL TILE OVER SELF-LEVELING COMPOUND.
1. PAINTED WALLS AND CEILINGS TO RECEIVE ONE COAT OF PRIMER AND 2 COATS OF SEMI- GLOSS ENAMEL.
2. BARE WOODWORK TO RECEIVE ON COAT OF PRIMER AND 2 COATS OF GLOSS ENAMEL.
3. CEILINGS AND WALLS TO BE THE SAME COLOR.
4. WALLS WITH VINYL WALL COVERING TO RECEIVE ONE COAT OF PRIMER.
R1. SEE ENLARGED GUEST ROOM PLANS FOR TILE PATTERN;
ENGINEERED STONE THRESHOLD AT BATH DOOR;
CT111 AND CT321 WALL TILE AT BATH AND SHOWER ALCOVES.
R2. STAIR NOSING BURKE #565 OR EQUIVALENT.
R3. FRP TO 48" A.F.F. AT WET WALLS.
R4. CT WAINSCOT TO 48" A.F.F.
R5. THRESHOLD PVC 180 AT UNIT ENTRIES.
R6. SOFFIT OVER BED P311.
R7. HEADBOARD WALL ACCENT VINYL WC312 WALL OPPOSITE HEADBOARD P346.
R8. VANITY WALL WC306A.
R9. CTBSF BASE AND CT WALLS TO CEILING, 24" PAST SIDES OF JANITOR SINK R10. TEXTURED QT PERMITTED IN WALKING PATHS, SMOOTH QT REQUIRED UNDER
EQUIPMENT
R11. CLEAR SEALER
R12. SEAMS IN SHEET VINYL SHALL BE HEAT WELDED
ACT ACOUSTIC CEILING TILE (TEGULAR EDGE IN PUBLIC AREAS)
C CONCRETE
CS CONCRETE, CLEAR SEALER
CPT CARPET
CT CERAMIC TILE
CTB 6" CERAMIC TILE BASE WITH 3/8" COVE
CTBSF 6" CERAMIC TILE BASE WITH SLIM FOOT 3/8" COVE
DP DUAL PANE
EP EPOXY FLOORING
FRP FIBERGLASS REINFORCED PLASTIC
GB GYPSUM BOARD, ORANGE PEEL TEXTURE
GC GYPSUM CONCRETE
GCS GYPSUM CONCRETE, CLEAR SEALER
HM HOLLOW METAL
KD KNOCK DOWN
LVT LUXURY VINYL TILE
MRGP MOISTURE RESISTANT GYPSUM BOARD
M MASONRY
MS MASONRY, CLEAR SEALER
PT PAINT
PL PLASTIC LAMINATE
QT QUARRY TILE
QTB 6" QUARRY TILE BASE WITH 3/8" COVE
T TEMPERED
TSRV TOP SET RUBBER OR VINYL
TSV TOP SET VINYL
RAF RUBBER ATHLETIC FLOORING
SACT SCRUBBABLE ACOUSTIC CEILING TILE
S SOLID CORE
SV SHEET VINYL
VACT VINYL ACOUSTIC CEILING TILE
VCT VINYL COMPOSITION TILE
VWC VINYL WALL COVERING
VFGB VINYL FACED GYPSUM BOARD PANELS, 1/2"
WD WOOD
1. BATHROOM WALLS AND CEILINGS: ORANGE PEEL.
2. OTHER WALLS AND CEILINGS: LIGHT KNOCKDOWN.
Room Finish Notes
WALL AND CEILING TEXTURE
PAINTING REQUIREMENTS
ABBREVIATIONS LEGEND
FINISH SCHEDULE REMARKS
42"
57"
180-DEGREE
DOOR VIEWER,
ADDITIONAL
DOOR VIEWER
AT ACCESSIBLE
UNITS
A B
UNIT ENTRY HINGED SINGLE
FLUSH
C
HINGED SINGLE
FLUSH w/ LOUVERS
HIGH AND LOW
LOUVERS PER
MECHANICAL
3 A
HORIZONTAL SLIDING
B C
6' - 6"
5' - 0"
5' - 6"
5' - 0"
5' - 6"
4' - 0"
HORIZONTAL SLIDING HORIZONTAL SLIDING
D
5' - 0"
5' - 0"
HORIZONTAL SLIDING
E
4' - 6"
5' - 0"
HORIZONTAL SLIDING
F
4' - 0"
4' - 0"
HORIZONTAL SLIDING
G
4' - 0"
5' - 0"
SINGLE HUNG
H
3' - 6"
5' - 0"
SINGLE HUNG
J
3' - 0"
6' - 0"
SINGLE HUNG
K
3' - 0"
5' - 0"
SINGLE HUNG
M
2' - 6"
5' - 0"
SINGLE HUNG
N
2' - 0"
5' - 0"
SINGLE HUNG
L
3' - 0"
4' - 0"
SINGLE HUNG
P
2' - 0"
5' - 0"
FIXED
Q
2' - 0"
4' - 0"
SINGLE HUNG
R
4' - 0"
5' - 0"
HORIZONTAL SLIDING
3 1. ELECTRONIC LOCKSET AND DEADBOLT WITH 2-3/4"
BACKSET, 1" THROW, HEAVY DUTY 4" STRIKE PLATE
WITH 3" SCREWS, WALL STOP
2. PRIVACY LOCKSET
3. PASSAGE LATCHSET
4. LOCKSET
5. LOCKSET, THRESHOLD (SET IN MASTIC)
HARDWARE SETS
Scale
Set Date
Drawn By
Project Number
ALL DRAWINGS AND WRITTEN MATERIAL
APPEARING HEREIN CONSTITUTE ORIGINAL
AND UNPUBLISHED WORK OF THE
ARCHITECT AND MAY NOT BE DUPLICATED,
USED OR DISCLOSED WITHOUT WRITTEN
CONSENT OF ARCHITECT
SHEET NO.
As indicated10/6/2025 10:58:54 AM
A2
Schedules
Hotel Investment Group
Santa Fe Place Multi-Family
Author
Oct. 6, 2025
992952 & 958 Postal Way, Vista, CA 92083
Hotel Circle North, Suite 200, San Diego, CA 92108
Door Schedule
Mark
R
oom:
Name Description
Elevation
Type Width Height Thickness
Door
Material
Frame
Material
Hardware
Set Fire Rating Comments
A1 Elec Hinged Sgl B 3' - 0" 6' - 8" 1 3/4" HM HM Existing A
2 Telecom Hinged Sgl B 3' - 0" 6' - 8" 1 3/4" HM HM Existing A4 WH Hinged Sgl Louver C 3' - 0" 6' - 8" 1 3/4" HM HM 5 B1 Elec Hinged Sgl B 3' - 0" 6' - 8" 1 3/4" HM HM Existing B2 Water Heater Hinged Sgl B 3' - 0" 6' - 8" 1 3/4" HM HM Existing B3 Storage Hinged Sgl B 3' - 0" 6' - 8" 1 3/4" HM HM Existing B4 Telecom Hinged Sgl B 3' - 0" 6' - 8" 1 3/4" HM HM Existing B5 Storage Hinged Sgl B 3' - 0" 6' - 8" 1 3/4" HM HM Existing B6 Laundry Hinged Sgl B 3' - 0" 6' - 8" 1 3/4" HM HM 4
Door Schedule - Units
Type Mark Description
E
levation
Type Width Height Thickness
Door
Material
Frame
Material Unit Set No Fire Rating GR Closer Comments
U1 Entry Hinged Sgl A 3' - 0" 6' - 8" 1 3/4" HM WD 1
U
1R Entry Hinged Sgl A 3' - 0" 6' - 8" 1 3/4" HM HM 1 1/3 HR ■ U2 Bath Hinged Sgl B 2' - 6" 6' - 8" 1 3/4" Comp KD 2
U2A Bath Acc Hinged Sgl B 3' - 0" 6' - 8" 1 3/4" Comp KD 2 U3 Bed Hinged Sgl B 3' - 0" 6' - 8" 1 3/4" Comp KD 2
U4 Closet Hinged Sgl B 2' - 6" 6' - 8" 1 3/4" Comp KD 3 Window Schedule
Count Type Mark Description Width Height
F
rame
Material Glass Light Vent Comments
2 A Horz Slider 6' - 6" 5' - 0" Dual Pane, Low-E 26.00 13.6 5 7 B Horz Slider 5' - 6" 5' - 0" Dual Pane, Low-E 22.00 11.55 5 Bt Horz Slider 5' - 6" 5' - 0" Dual Pane, Low-E, Tempered 22.00 11.55 7 D Horz Slider 5' - 0" 5' - 0" Dual Pane, Low-E 20.00 10.50 7 E Horz Slider 4' - 6" 5' - 0" Dual Pane, Low-E 18.00 9.45 3 F Horz Slider 4' - 0" 4' - 0" Dual Pane, Low-E 12.80 6.72 13 G Sgl Hung 4' - 0" 5' - 0" Dual Pane, Low-E 14.60 8.00 15 H Sgl Hung 3' - 6" 5' - 0" Dual Pane, Low-E 12.78 7.00 4 Ht Sgl Hung 3' - 6" 5' - 0" Dual Pane, Low-E, Tempered 12.78 7.00 1 J Sgl Hung 3' - 0" 6' - 0" Dual Pane, Low-E 13.32 7.20 5 K Sgl Hung 3' - 0" 5' - 0" Dual Pane, Low-E 11.10 6.00 1 L Sgl Hung 3' - 0" 4' - 0" Dual Pane, Low-E 8.88 4.80 5 M Sgl Hung 2' - 6" 5' - 0" Dual Pane, Low-E 9.13 5.00 1 Nt Sgl Hung 2' - 0" 5' - 0" Dual Pane, Low-E, Tempered 7.30 4.00 1 Pt Fixed 2' - 0" 5' - 0" Dual Pane, Low-E, Tempered
2 Q Sgl Hung 2' - 0" 4' - 0" Dual Pane, Low-E 5.92 3.20 1 R Horz Slider 4' - 0" 5' - 0" Dual Pane, Low-E 16.00 8.40 1 X Fixed 4' - 0" 5' - 0" AL Existing Existing
2 2
2 2
DOOR TYPE U2X
REMOVED2
No. Description Date
2 Coordination 3/12/25
3 Fire Dept, SDG&E,
Owner, Coord.
7/30/25
3 3
DOOR A3
REMOVED3 3
3 05/26/2026
C11
7/8" EXTERIOR STUCCO
OVER METAL LATH OVER
30# BUILDING PAPER
2x4 OR 2x6 STUDS 16" O.C.
R15 BATT INSULATION AT
2x4 STUD WALLS, R21 AT
2x6 STUD WALLS
5/8" TYPE 'X'
GYPSUM BOARD
CBC TABLE 721.1 (1)
5-1/2” GLASS FIBER
INSULATION BATTS
STC 50 to 54
SOUND TESTS NRCC TL-93-098, TL-93-103,
IRC-IR-761, 3-98
1-HOUR FIRE
FIRE TESTS UL R14196, O5NK05371, 2-15-05,
UL DESIGN U309
GA FILE NOS. WP 3242 AND 3243 PLAN VIEW
RESILIENT CHANNELS 16" O.C.
ATTACHED AT RIGHT ANGLES TO
ONE SIDE OF STUDS WITH 1-1/4"
TYPE 'S' SCREWS
ONE LAYER TYPE X GYPSUM
WALLBOARD APPLIED PARALLEL
OR AT RIGHT ANGLES TO STUDS
SPACED 16" O.C. WITH 6d CEMENT
COATED NAILS, 1-7/8" LONG, 0.0915"
SHANK, 15/64" HEADS, 7" O.C.
STAGGER VERTICAL JOINTS 24"
FROM OPPOSITE SIDE
ONE LAYER 5/8" TYPE 'X' GYPSUM
BOARD APPLIED AT RIGHT ANGLES
TO CHANNELS WITH 1" TYPE 'S'
SCREWS 8" O.C. WITH VERTICAL
JOINTS LOCATED MIDWAY
BETWEEN STUDS
2x6 STUDS 16" O.C.
WATER RESISTANT GYPSUM
BOARD AT BATHROOMS
PROTECTIVE WRAP
AROUND DRAIN PIPE
AND HOT WATER LINE
REQUIRED CLEAR KNEE SPACE,
30" MINIMUM WIDE
MAXIMUM ALLOWABLE
TOE CLEARANCE
BASE PER ROOM
FINISH SCHEDULE
SINK PER PLUMBING
FIXTURE SCHEDULE
SIDES OF CABINET
AND BACK WALL
SHALL BE NON
ABSORBENT
27" MINIMUM
34" MAXIMUM
EXTEND FINISH FLOOR
SURFACE UNDER
CABINET TO WALL
NO SHARP OR ABRASIVE
SURFACES PERMITTED
UNDER SINK
ACCESSIBLE FAUCET PER PLUMBING FIXTURE
SCHEDULE, OPERABLE WITH ONE HAND WITHOUT
TIGHT GRASPING, PINCHING OR TWISTING
19" MINIMUM
MIN.
9"
MIN.
8"
(11" MIN.)
13"
MAX.
6"
TOP OF RIM AT OVERMOUNT SINKS,
OR COUNTERTOP AT UNDERMOUNT
PROTECTIVE WRAP
AROUND DRAIN PIPE
AND HOT WATER LINE
REQUIRED CLEAR KNEE
SPACE, 30" MINIMUM WIDE
MAXIMUM ALLOWABLE
TOE CLEARANCE
BASE PER ROOM
FINISH SCHEDULE
ACCESSIBLE LAVATORY PER
PLUMBING FIXTURE SCHEDULE
SIDES OF
CABINET AND
BACK WALL
SHALL BE NON
ABSORBENT
29" MINIMUM
34" MAXIMUM
EXTEND FINISH
FLOOR SURFACE
UNDER CABINET
TO WALL
NO SHARP OR ABRASIVE
SURFACES PERMITTED
UNDER SINK
ACCESSIBLE FAUCET PER PLUMBING FIXTURE
SCHEDULE, OPERABLE WITH ONE HAND WITHOUT
TIGHT GRASPING, PINCHING OR TWISTING
19" MAXIMUM
27" MINIMUM
MIN.
9"
11" MIN.
MAX.
6"
TOP OF RIM AT OVERMOUNT LAVS,
OR COUNTERTOP AT UNDERMOUNT
MIN.
8"
36" MAX
33" MIN.
10" MAX.
8" MIN.
1' - 3"
6' - 6" A.F.F.
12" MAX. 24" MIN. 24" MAX.
36" MAX.
33" MIN.
48" MAX.
2 1/2" 24" MIN.
6' - 10" A.F.F.
EQ EQ
HAND SHOWER
WITH 59" LONG
MIN. HOSE
12" MIN. 2 1/2"
TUB CONTROLS, OTHER THAN DRAIN STOPPER,
SHALL BE LOCATED WITHIN HATCHED AREA
12" MIN.
2' - 10"
24" MAX. 24" MIN. 12" MAX.
REMOVABLE
SEAT
60" MIN. CLEAR
30" MIN. CLEAR
24" MIN.
12" MIN.
GRAB BAR
30" x 60"
CLEAR
24" MIN.
GRAB BAR
54" MIN.
12" MAX. 42" MIN.
24" MIN.
9" MAX.
7" MIN.
19"
36" MAX. TO TOP OF GRIPPING SURFACE
33" MIN.
MIN.
12"
MIN.
12"
36" MIN. 6" MAX.
19" MAX.
17" MIN.
36" MAX. TO TOP OF GRIPPING SURFACE
33" MIN.
FLUSH VALVE ON WIDE SIDE, 44" MAX. A.F.F.
1134A.7.1
36" MIN. CLEAR
1124A.7.1 EXC.
36" MIN.
18" MAX.
17" MIN.
VANITY
48"
1 2
3 4
5 6
7 8
9 10
11 12
P
OGM
BASIS OF DESIGN:
SALISBURY INDUSTRIES
3312 - TYPE II
#8 x 1-1/2" WAFER HEAD
SCREWS 24" INTO
FRAMING OR BLOCKING
#8 x 1/2" WAFER HEAD
SCREWS AT EACH JOIST
WHERE BRACE OCCURS
150F125-30 OR 162S125-30
LATERAL BRACE AT MID-SPAN
WHERE JOIST TOTAL SPAN IS
BETWEEN 7"-5" AND 9'-7"
5/8" TYPE 'X'
GYPSUM BOARD
250S125-30 AT 24" O.C.
(2) #8 x 1/2" WAFER
HEAD SCREWS WHERE
VERTICAL OCCURS
362S125-30 VERTICAL SUPPORT
WHERE JOIST TOTAL SPAN IS 9'-7"
OR MORE. AT EACH JOIST, 7'-5"
O.C. MAX.
FIRE-STOP SEALANT MATERIAL PER UL
LISTINGS BELOW
FIRE RATED FLOOR/
CEILING PER FIRE
ASSEMBLY DETAILS
PIPE OR OTHER
PENETRATION OF FIRE
RATED FLOOR/ CEILING
ASSEMBLY
FIRESTOP COLLAR PER UL
LISTINGS AT ABS AND PVC
PENETRATIONS
UL F-C-1009 METALLIC PIPE (HILTI)
UL F-C-2382 PVC AND ABS (HILTI)
UL F-C-2310 PEX (HILTI)
FIRE-STOP SEALANT MATERIAL
PER UL LISTINGS BELOW
FIRE RATED WALL PER FIRE
ASSEMBLY DETAILS
PIPE OR OTHER
PENETRATION OF FIRE
RATED WALL
UL W-L-1479 METALLIC PIPE (3M)
UL W-L-2385 PVC, CPVC & ABS (3M)
UL W-L-2186 PEX (HILTI)
UL W-L-2165 ENT (HILTI)
UL W-L-3001 ROMEX (3M)
MIN.
2' - 0"
MEMBRANE PENETRATIONS BY STEEL BOXES
1. MEMBRANE PENETRATIONS IN WALLS AND PARTITIONS WITH UP TO 2-HR RATINGS ARE PERMITTED FOR STEEL ELECTRICAL BOXES THAT DO NO EXCEED 16 SQ. IN. IN AREA, PROVIDED THAT THE AGGREGATE AREA OF THE OPENINGS DOES NOT EXCEED 100 SQ. IN. IN ANY 100 SQ. FT. OF WALL AREA. THE ANNULAR SPACE AROUND SUCH BOXES SHALL NOT EXCEED 1/8".
BOXES ON OPPOSITE SIDES OF THE WALL OR PARTITION SHALL BE SEPARATED BY ONE OF THE FOLLOWING MEANS:
1.1 A HORIZONTAL DISTANCE NOT LESS THAN 24" IN WALLS WITH NON-COMMUNICATING STUD CAVITIES.
1.2. A DISTANCE NOT LESS THAN THE DEPTH OF THE WALL CAVITY WHERE THE CAVITY IS
FILLED WITH CELLULOSE LOOSE-FILL, ROCK WOOL, OR SLAG MINERAL WOOL INSULATION.
MIN.
D
1.3. SOLID FIRE BLOCKING IN CONFORMANCE WITH CBC 717.2.1.
1.4. PROTECTING BOTH BOXES BY LISTED PUTTY PADS.
SOLID FIRE BLOCKING
D
LISTED PUTTY PAD
ON BOTH BOXES
1.5 OTHER LISTED MATERIALS AND METHODS.
MEMBRANE PENETRATIONS BY BOXES OF OTHER MATERIAL
2. MEMBRANE PENETRATIONS BY LISTED ELECTRICAL BOXES OF ANY MATERIAL ARE PERMITTED,
PROVIDED SUCH BOXES HAVE BEEN TESTED FOR USE IN FIRE-RESISTANCE-TESTED ASSEMBLIES AND ARE INSTALLED IN ACCORDANCE WITH THE INSTRUCTIONS INCLUDED IN THE LISTING. THE ANNULAR SPACE AROUND SUCH BOXES SHALL NOT EXCEED 1/8" UNLESS LISTED OTHERWISE.
BOXES ON OPPOSITE SIDE OF THE WALL OR PARTITION SHALL BE SEPARATED BY ONE OF THE FOLLOWING MEANS:
2.1. THE HORIZONTAL DISTANCE SPECIFIED IN THE LISTING.
2.2. SOLID FIRE BLOCKING IN CONFORMANCE WITH CBC 718.2.2. SEE 1.3 ABOVE.
2.3. PROTECTING BOTH BOXES BY LISTED PUTTY PADS. SEE 1.4 ABOVE.
2.4. OTHER LISTED MATERIALS AND METHODS.
MEMBRANE PENETRATIONS OF BOXES ANY SIZE OR TYPE
3. MEMBRANE PENETRATIONS BY ELECTRICAL BOXES OF ANY SIZE OR TYPE, WHICH HAVE BEEN LISTED
AS PART OF A WALL OPENING PROTECTIVE MATERIAL SYSTEM FOR USE IN FIRE-RESISTANCE-RATED
ASSEMBLIES AND ARE INSTALLED IN ACCORDANCE WITH THE INSTRUCTIONS INCLUDED IN THE LISTING.
MEMBRANE PENETRATIONS BY BOXES OTHER THAN ELECTRICAL
4. MEMBRANE PENETRATIONS BY BOXES OTHER THAN ELECTRICAL BOXES, PROVIDED SUCH
PENETRATING ITEMS AND THE ANNULAR SPACE BETWEEN THE WALL MEMBRANE AND THE BOX, ARE
PROTECTED BY AN APPROVED MEMBRANE PENETRATION FIRES TOP SYSTEM INSTALLED AS TESTED IN ACCORDANCE WITH ASTM E 814 OR UL 1479, WITH A MINIMUM POSITIVE PRESSURE DIFFERENTIAL OF 0.01 INCH (2.49 PA) OF WATER, AND SHALL HAVE AN F AND T RATING OF NOT LESS THAN THE
REQUIRED FIRE-RESISTANCE RATING OF THE WALL PENETRATED AND BE INSTALLED IN ACCORDANCE WITH THEIR LISTING.
MEMBRANE PENETRATION BY SPRINKLER PIPE
5. THE ANNULAR SPACE CREATED BY THE PENETRATION OF AN AUTOMATIC SPRINKLER, PROVIDED IT IS COVERED BY A METAL ESCUTCHEON PLATE.
I-JOISTS 24"
O.C. MAX.
5/8" MIN. PLYWOOD
FLOOR SHEATHING
1-1/2" LIGHTWEIGHT
CONCRETE
9 1/2" MIN.
(2) LAYERS 1/2" TYPE 'X'
GYPSUM BOARD
GA FILE NO. FC5513, 1-HOUR
FIRE TEST: FM J.I. 2C9Q7.AC, 9-29-78, FM DESIGN FC-268
STC/IIC: 58/77 (CARPET AND PAD)
SOUND TEST: CALIFORNIA OFFICE OF NOISE CONTROL ASSEMBLY 2.1.4.2.1.9 BASE LAYER 1/2″ TYPE 'X' GYPSUM BOARD APPLIED AT RIGHT ANGLES TO RESILIENT CHAN NELS 16 O.C. WITH 1″ TYPE 'S' SCREWS 8″ O.C. AT END JOINTS AND 16″ O.C. IN THE FIELD OF THE PANELS. FACE LAYER 1/2" TYPE 'X' GYPSUM BOARD APPLIED AT RIGHT ANGLES TO RESILIENT CHANNELS WITH 1-5/8″ TYPE 'S' SCREWS 8″ O.C. AND 1-1/2″ TYPE G SCREWS 8″ O.C. AT BUTT JOINTS LOCATED MIDSPAN BETWEEN RESILIENT CHANNELS. RESILIENT CHANNELS APPLIED AT RIGHT ANGLES TO 9-1/2″ DEEP WOOD I-JOISTS 24 O.C. WITH 1-1/4″ TYPE 'S' SCREWS.
MINIMUM 3-1/2″ GLASS FIBER OR MINERAL FIBER BATT DRAPED OVER RESILIENT CHANNEL S AND CEILING MEMBRANE OR WITHIN THE CONCEALED SPACE. WOOD I-JOISTS SUPPORTING 19/32″ WOOD STRUCTURAL PANEL SUBFLOOR APPLIED AT RIGHT ANGLES TO I -JOISTS CONSTRUCTION ADHESIVE AND 6D RINGED SHANK NAILS 12″ O.C. 1-1/2″ LIGHTWEIGHT CONCRETE POURED OVER PLYWOOD.
MIN. R-11 BATT
INSULATION
RC-1 CHANNEL
24" O.C.
(E) 2x STUDS 16" O.C.
(E) STUCCO OVER METAL
LATH OVER BLDG PAPER
(E) STUCCO J-MOULD
(E) WEATHER RESISTANT
DECK COATING
(E) TREAD OR
LANDING SHEATHING
(E) 5/8" TYPE 'X'
GYPSUM BOARD
(E) PLYWOOD SHEATHING,
WHERE OCCURS
(E) STRINGER OR
LANDING JOIST
(E) INSULATION
(E) 5/8" TYPE 'X'
GYPSUM BOARD
5/8" TYPE 'X' GYPSUM
BOARD OVER METAL
CEILING FRAMING
ELECTRICAL ROOMDWELLING UNIT
2 (E) 5/8" TYPE 'X' GYPSUM
BOARD UNDER STAIR
STRINGERS
(E) 5/8" TYPE 'X'
GYPSUM BOARD
(E) 2x STUDS 16" O.C.
(E) INSULATION
(E) 5/8" TYPE 'X' GYPSUM
BOARD UNDER STAIR
STRINGERS
(E) 5/8" TYPE 'X'
GYPSUM BOARD
(E) 2x CEILING JOISTS
(E) 5/8" TYPE 'X'
GYPSUM BOARD
5/8" TYPE 'X' WATER-
RESISTANT GYPSUM
BOARD OVER METAL
CEILING FRAMING
ELECTRICAL ROOM BATHROOM
2x STUDS 16" O.C.
5/8" WATER RESISTANT GYPSUM
BOARD BEHIND SHOWER SURROUND
SEALANT
PREFABRICATED
SHOWER PAN
PREFABRICATED
SHOWER SURROUND
5/8" TYPE 'X' GYPSUM BOARD, FLOOR
TO CEILING BEHIND SHOWER PAN
5/8" WATER-RESISTANT GYPSUM
BOARD TO TUB FLANGE
PREFABRICATED
TUB SURROUND
TUB PER PLUMBING
2x STUDS 16" O.C.
5/8" TYPE 'X' GYPSUM BOARD,
FLOOR TO CEILING BEHIND TUB
ACOUSTIC SEALANT
FLOOR
SEALANT
#8 x 3 SCREWS INTO
FRAMING OR BLOCKING
#8 x 3" SCREWS AT EACH JOIST
WHERE BRACE OCCURS
2x3 FLAT LATERAL BRACE AT
MID-SPAN WHERE JOIST TOTAL
SPAN IS BETWEEN 7"-5" AND 9'-7"
5/8" TYPE 'X'
GYPSUM BOARD
2x4 CEILING JOISTS 24" O.C.
(2) #8 x 1/2" WAFER
HEAD SCREWS WHERE
VERTICAL OCCURS
2x3 VERTICAL SUPPORT WHERE
JOIST TOTAL SPAN IS 9'-7" OR MORE
AT EACH JOIST, 7'-5" O.C. MAX.
Scale
Set Date
Drawn By
Project Number
ALL DRAWINGS AND WRITTEN MATERIAL
APPEARING HEREIN CONSTITUTE ORIGINAL
AND UNPUBLISHED WORK OF THE
ARCHITECT AND MAY NOT BE DUPLICATED,
USED OR DISCLOSED WITHOUT WRITTEN
CONSENT OF ARCHITECT
SHEET NO.
As indicated10/6/2025 10:58:57 AM
A3.1
Typical Details
Hotel Investment Group
Santa Fe Place Multi-Family
Author
Oct. 6, 2025
992952 & 958 Postal Way, Vista, CA 92083
Hotel Circle North, Suite 200, San Diego, CA 92108
1 1/2" = 1'-0"A3.1
1 Exterior Wall 1-HR
1 1/2" = 1'-0"A3.1
2 Fire Partition (Party)
1" = 1'-0"A3.1
6 Accessible Sink Base
1" = 1'-0"A3.1
7 Accessible Lavatory Base
1/2" = 1'-0"A3.1
13 Accessible Tub Elevations
1/2" = 1'-0"A3.1
8 Accessible Tub Plan
1/2" = 1'-0"A3.1
12 Accessible Toilet
3/4" = 1'-0"A3.1
16 Mailbox Cluster 12 + Parcel
1 1/2" = 1'-0"A3.1
17 Drop Ceiling Mid-Span Support
1 1/2" = 1'-0"A3.1
10 Firestop at Floor Ceiling Penetration
1 1/2" = 1'-0"A3.1
15 Firestop at Wall Penetration
1 1/2" = 1'-0"A3.1
5 Membrane Penetrations
1 1 1/2" = 1'-0"A3.1
9 Floor Ceiling I-Joist 1-HR STC 50+
1 1/2" = 1'-0"A3.1
14 Fire Barrier at Stair 1
1 1/2" = 1'-0"A3.1
19 Fire Barrier at Stair 2
1 1/2" = 1'-0"A3.1
22 Shower at Wall
1 1/2" = 1'-0"A3.1
21 Tub at Wall
2 2/11/25
1 1/2" = 1'-0"A3.1
23 Drop Ceiling Mid-Span Support Wood
No. Description Date
1 Plan Check 1,
c
oordination
7/8/24
2 Coordination 3/12/25
05/26/2026
C11
C
5" MIN.
A
B
ROUGH OPENING
INSTALL 4" WIDE BUTTERFLY FLASHING PIECE "C" AT LOWER CORNERS OF OPENING; FLASHING SHOULD BE STARTED AT THE INTERIOR SURFACE OF THE
OPENING, OVER THE SILL FLASHING, THEN FOLDED OVER THE EXTERIOR
SURFACES OF THE SILL FLASHING AND PRESSED INTO PLACE
FIGURE 5
SET WINDOW NAILING FLANGE INTO SEALANT AND FASTEN TO STRUCTURE FIGURE 6
A
B
D D
E
F
G 2" MIN.
1' - 0" MIN.
2"
INSTALL DRIP FLASHING PIECE (NOT SHOWN) ACROSS TOP OF FRAME. APPLY FLASHING PAPER "E" AT HEAD, OVERLAPPING DRIP FLASHING AND JAMB PIECES. WEATHER
BARRIER PAPER, APPLIED WITH EXTERIOR FINISH MATERIAL, IS APPLIED SHINGLE FASHION. PIECE "F" UNDERLAYS THE SILL PIECE. PIECE "G" SHOULD OVERLAP PIECE "F" BY AT LEAST 2"
A
B
D D
FIGURE 3
INSTALL FLASHING PAPER PIECE "D" AT JAMBS. ATTACH AT EDGE OF OPENING ONLY; APPLY A BEAD OF SEALANT WITHIN 1/2" OF OPENING
FIGURE 4
C
A
B
ROUGH OPENING
D D
8" MIN. - 12" MAX.
6" MIN.
INSTALL SILL FLASHING PIECE "B"; EXTEND SILL FLASHING UP JAMB 4" MINIMUM
ROUGH OPENING
A
B
FIGURE 2
5" MIN.
INSTALL FLASHING PAPER: SILL PIECE "A" FIRST, ATTACH AT EDGE OF OPENING ONLY
MATERIALS
FLASHING PAPER AND WEATHER BARRIER PAPER: PER FEDERAL SPECIFICATION UU-B-90A; VAPOR BARRIER COATED AND REINFORCED. SEE SPECIFICATION FOR GRADE SILL FLASHING AND BUTTERFLY: 25 MIL BITUTHENE (VYCOR PLUS) DRIP FLASHING: PER SPECIFICATIONS
FIGURE 1
8" MIN. - 12" MAX.5" MIN.
8" MIN. - 12" MAX.
ROUGH OPENING
A
(E) STUCCO OVER
METAL OVER BLDG
PAPER, REPAIR AS
NECESESSARY
FLEXIBLE WINDOW
STRIP FLASHING
OVER NAILING FIN
5/8" TYPE 'X' GYPSUM BOARD,
REPAIR AS NECESSARY
PLYWOOD SHEATHING
(WHERE OCCURS) SEE
STRUCTURAL
HEADER PER STRUCTURAL
FILL GAP WITH SPRAY
FOAM INSULATION
SEALANT
SMOOTH FINISH
STUCCO OVER MESH
OVER FOAM TRIM
SLOPE TO DRAIN
1 1/2"
4"
INSULATION PER ENV FORMS
WINDOW PER
SCHEDULE
FLEXIBLE WINDOW
STRIP FLASHING
UNDER NAILING FIN
5/8" TYPE 'X' GYPSUM BOARD,
REPAIR AS NECESSARY
PLYWOOD SHEATHING
(WHERE OCCURS) SEE
STRUCTURAL
JAMB FRAMING
PER STRUCTURAL
FILL GAP WITH SPRAY
FOAM INSULATION
WINDOW PER
SCHEDULE
SEALANT
(E) STUCCO OVER
METAL LATH OVER
BLDG PAPER, REPAIR
AS NECESSARY
SLOPE TO DRAIN
1 1/2"
4"SMOOTH FINISH
STUCCO OVER MESH
OVER FOAM TRIM
(E) STUCCO OVER METAL
LATH OVER BLDG PAPER,
REPAIR AS NECESSARY
WINDOW PER SCHEDULE
WOOD FRAME WALL
PLYWOOD SHEATHING
(WHERE OCCURS) SEE
STRUCTURAL
5/8" TYPE 'X' GYPSUM BOARD,
REPAIR AS NECESSARY
SMOOTH FINISH
STUCCO OVER MESH
OVER FOAM TRIM
SLOPE TO DRAIN
1 1/2"
4"
FLEXIBLE WINDOW
STRIP FLASHING
UNDER NAILING FIN
WINDOW PER
SCHEDULE
SMOOTH FINISH
STUCCO OVER MESH
OVER FOAM TRIM
FLEXIBLE FLASHING
UNDER NAILING FIN
STUCCO J-MOULD
SEALANT OVER
BACK ROD
SEALANT OVER
BACK ROD
SLOPE PTAC SLEEVE
TO DRAIN TOWARD
THE EXTERIOR
PTAC LOUVER
STUCCO J-MOULD
FLEXIBLE
FLASHING BEHIND
STUCCO J-MOULD
5/8" TYPE 'X'
GYPSUM BOARD
PTAC SLEEVE
1 1/2"
VERIFY
STUCCO OVER METAL
LATH OVER BLDG PAPER,
REPAIR AS NECESSARY
STUCCO J-MOULD
SEALANT OVER
BACKER ROD
5/8 " TYPE 'X'
GYPSUM BOARD
JAMB FRAMING PER
STRUCTURAL
DOOR PER SCHEDULE
HOLLOW METAL
DOOR FRAME
STUCCO OVER METAL LATH
OVER BUILDING PAPER,
REPAIR AS NECESSARY
JAMB FRAMING
PER STRUCTURAL
5/8" TYPE 'X'
GYPSUM BOARD
HOLLOW METAL
DOOR FRAME
INSULATION
STUCCO J-MOULD
SEALANT OVER
BACKER ROD
DOOR PER
SCHEDULE
DECORATIVE SCREEN
PER ELEVATIONS
PVC CHANNEL ALL
FOUR SIDES,
FREEDOM 73004496
OR EQUIVALENT
#8 STAINLESS STEEL SCREWS
24" O.C. MAX. INTO (E) WOOD
STUDS, PREDRILL THROUGH
STUCCO AND FILL HOLE HALF
FULL WITH SEALANT BEFORE
SETTING SCREW
(E) STUCCO OVER
METAL LATH OVER
BUILDING PAPER
(E) PLYWOOD
WHERE OCCURS
NEOPRENE GASKET
BETWEEN STUCCO
AND CHANNEL
(E) WOOD HEADER
OR POST
2x2 P.T. TRIM, PRIMED
AND PAINTED
DECORATIVE SCREEN
PER ELEVATIONS
#8 STAINLESS STEEL
SCREWS 24" O.C. MAX.
(E) WALL FRAMING
2x2 P.T. TRIM, PRIMED
AND PAINTED
DECORATIVE SCREEN
PER ELEVATIONS
#8 STAINLESS STEEL
SCREWS 24" O.C. MAX.
PREDRILL HOLES THROUGH
STUCCO AND FILL HALF
FULL WITH SEALANT
(E) STUCCO
NEOPRENE GASKET
BETWEEN STUCCO
AND P.T. TRIM
HEAD AND JAMB
CONDITION
SILL CONDITION
(E) 2x FRAMING
(E) STUCCO OVER
METAL LATH OVER
BLDG PAPER
STUCCO OVER METAL
LATH OVER BLDG PAPER
2x4 INFILL
FRAMING 16" O.C.
5/8" TYPE 'X'
GYPSUM BOARD
REMOVE (E) STUCCO TO
RECEIVE NEW FINISHES FINISH STUCCO COAT
OVER FOAM TRIM
+/-
1"
+/-
1"
STUCCO OVER METAL
LATH OVER BLDG PAPER
(E) STUCCO BASE BELOW
26 GA. G.S. STUCCO
J-MOULD
SEALANT OVER
BACK ROD
(E) 8x8 POST
2x4 INFILL
FRAMING 16" O.C.
5/8" TYPE 'X'
GYPSUM BOARD
REMOVE (E) STUCCO TO
RECEIVE NEW FINISHES
(E) STUCCO
BASE BELOW
STUCCO OVER METAL
LATH OVER BLDG PAPER
26 GA. G.S. STUCCO
J-MOULD
SEALANT OVER
BACK ROD
2x4 INFILL
FRAMING 16" O.C.
26 GA. G.S. L-TRIM
DECORATIVE
SCREEN
14 A3.2
(E) 2x SILL
(E) STUCCO OVER METAL
LATH OVER BLDG PAPER
STUCCO OVER METAL
LATH OVER BLDG PAPER
2x4 INFILL
FRAMING 16" O.C.
5/8" TYPE 'X'
GYPSUM BOARD
REMOVE (E) STUCCO TO
RECEIVE NEW FINISHES
ELASTOMERIC FLASHING
UNDER BLDG PAPER
BLDG PAPER UNDER
ELASTOMERIC FLASHING
(E) 2x FRAMING 16" O.C.
STUCCO OVER METAL
LATH OVER BLDG PAPER
2x4 INFILL
FRAMING 16" O.C.
5/8" TYPE 'X'
GYPSUM BOARD
26 GA. G.S. STUCCO
J-MOULD
2x4 P.T.D.F
SILL PLATE
(E) CONCRETE
WALK, SAWCUT AS
NECESSARY FOR
NEW FOOTING
MIN.
6"
+/-
2"
ALIGN WITH TOP
OF (E) BLDG SLAB
(E) A.C. PAVING
CONCRETE
OR A.C. FILL
CONCRETE
FOOTING
FACE OF (E)
FOOTING BEYOND
MIN. CLR.
3"BOTTOM OF
FOOTING ALIGN
WITH BOTTOM OF (E)
ADJACENT FOOTING
#4 TOP AND
BOTTOM, EPOXY
TO (E) CONCRETE
FOOTING
20 A3.2
1. THREADED ROD OR DOWELS EMBEDDED IN EPOXY SHALL BE INSTALLED PER MANUFACTURER'S INSTRUCTIONS.
2. THREADED ROD OR DOWEL EMBEDMENT SHALL BE VERIFIED BY SPECIAL INSPECTION. SPECIAL INSPECTION NOT REQUIRED WHERE EPOXY IS USED IN ASSEMBLIES WHICH ARE NOT PART OF A LATERAL FORCE RESISTING SYSTEM.
3. ONLY NON-REBAR-CUTTING DRILL BITS SHALL BE USED TO DRILL HOLES IN EXISTING CONCRETE.
4. EPOXY SHALL BE SIMPSON SET-XP (ICC ESR-2508), OR APPROVED EQUAL.
5. DRILLED HOLES SHALL BE CLEANED OF CONCRETE DUST AND DEBRIS USING
EITHER A NYLON BRUSH AND A VACUUM OR A NYLON BRUSH AND COMPRESSED AIR. A BLOW-OUT BULB MAY BE USED IF A VACUUM OR COMRESSED AIR ARE NOT AVAILABLE.
6. PLACE EPOXY IN HOLE WITH CAULKING GUN OR SIMILAR DEVICE STARTING AT THE BOTTOM, FILLING HOLE APPROXIMATELY 2/3 FULL.
7. COAT ROD OR REBAR WITH SAME EPOXY AND INSERT INTO HOLE.
PROCEDURE
REBAR HOLE SIZE
REBAR
SIZE
BIT
DIA.
MIN.
DEPTH
#3
#4
#5
#6
#7
#8
1/2"
5/8"
3/4"
7/8"
1"
1 1/8"
3 1/2"
4 1/4"
5"
6 3/4"
7 3/4"
9"
ROD HOLE SIZE
ROD
SIZE
BIT
DIA.
MIN.
DEPTH
3/8"
1/2"
5/8"
3/4"
7/8"
1"
7/16"
9/16"
11/16"
13/16""
15/16"
1 1/16"
3 1/2"
4 1/4"
5"
6 3/4"
7 3/4"
9"
PER CHART
HOLE DEPTH
PER CHART
HOLE DIA.
THREADED
ROD OR REBAR
EPOXY GROUT
FACE OF EXISTING
CONCRETE
2x WOOD STUD
FRAME WALL
5/8" TYPE 'X'
GYPSUM BOARD
(2) LAYERS 1/2" TYPE 'X'
GYPSUM BOARD LAMINATED
TO FORM 6" GYPSUM STUD
SPACED AT 24" O.C. MAXIMUM
GA FILE NO WP 1330
1 HOUR ASSEMBLY
STAINLESS
STEEL CABINET MOUNT FOR HIGHEST OPERABLE PART NO HIGHER THAN 48" 5'-0" MAX MOUNTING HEIGHT TO TOP OF CABINET
5/8" TYPE 'X' EXTERIOR
GYPSUM SHEATHING AT
ALL SURFACES OF RECESS
STUCCO OVER
METAL LATH OVER
BLDG PAPER
2x WOOD STUD
FRAME WALL
Scale
Set Date
Drawn By
Project Number
ALL DRAWINGS AND WRITTEN MATERIAL
APPEARING HEREIN CONSTITUTE ORIGINAL
AND UNPUBLISHED WORK OF THE
ARCHITECT AND MAY NOT BE DUPLICATED,
USED OR DISCLOSED WITHOUT WRITTEN
CONSENT OF ARCHITECT
SHEET NO.
As indicated10/6/2025 10:58:58 AM
A3.2
Typical Details
Hotel Investment Group
Santa Fe Place Multi-Family
Author
Oct. 6, 2025
992952 & 958 Postal Way, Vista, CA 92083
Hotel Circle North, Suite 200, San Diego, CA 92108
1/2" = 1'-0"A3.2
5 Window Flashing Figures
3" = 1'-0"A3.2
6 Window Head Stucco Foam
3" = 1'-0"A3.2
7 Window Jamb Stucco Foam
3" = 1'-0"A3.2
8 Window Sill Stucco Foam
3" = 1'-0"A3.2
10 Window Sill PTAC Head Sill
3" = 1'-0"A3.2
11 Ext Door Head HM Stucco
3" = 1'-0"A3.2
12 Ext Door Jamb HM Stucco
3" = 1'-0"A3.2
15 Decorative Screen Face Mount
3" = 1'-0"A3.2
14 Decorative Screen Head Jamb
2 No. Description Date
2 Coordination 3/12/25
3 Fire Dept, SDG&E,
Owner, Coord.
7/30/25
3" = 1'-0"A3.2
16 Infill Framing at (E) Wall
3" = 1'-0"A3.2
17 Infill Framing at (E) Wood Post
3" = 1'-0"A3.2
18 Infill Framing at (E) Stucco Base
3 3" = 1'-0"A3.2
19 Infill Framing at Curb
12" = 1'-0"A3.2
20 Epoxy Anchor
5/26/25
3" = 1'-0"A3.2
21 Fire Extinguisher Cabinet
05/26/2026
C11
1 12
D D
A A
B B
CC
2 3 4 5 6 7 9 10 118
6438 SF
Level 1
1005 SF
Covered Walkway
58 SF
Stair 1
79 SF
Electrical 1
79 SF
Electrical 2
58 SF
Stair 2
58 SF
WH
266 SF
Min. Light 21 SF
Min. Vent 11 SF172 SF
Min. Light 14 SF
Min. Vent 7 SF
264 SF
Min. Light 21 SF
Min. Vent 11 SF 159 SF
Min. Light 13 SF
Min. Vent 6 SF
159 SF
Min. Light 13 SF
Min. Vent 6 SF
159 SF
Min. Light 13 SF
Min. Vent 6 SF
159 SF
Min. Light 13 SF
Min. Vent 6 SF
172 SF
Min. Light 14 SF
Min. Vent 7 SF
264 SF
Min. Light 21 SF
Min. Vent 11 SF
264 SF
Min. Light 21 SF
Min. Vent 11 SF
264 SF
Min. Light 21 SF
Min. Vent 11 SF
266 SF
Min. Light 21 SF
Min. Vent 11 SF
323 SF
Min. Light 26 SF
Min. Vent 13 SF
266 SF
Min. Light 21 SF
Min. Vent 11 SF
266 SF
Min. Light 21 SF
Min. Vent 11 SF
266 SF
Min. Light 21 SF
Min. Vent 11 SF
266 SF
Min. Light 21 SF
Min. Vent 11 SF
323 SF
Min. Light 26 SF
Min. Vent 13 SF
164 SF
Min. Light 13 SF
Min. Vent 7 SF
172 SF
Min. Light 14 SF
Min. Vent 7 SF
172 SF
Min. Light 14 SF
Min. Vent 7 SF
172 SF
Min. Light 14 SF
Min. Vent 7 SF
172 SF
Min. Light 14 SF
Min. Vent 7 SF
164 SF
Min. Light 13 SF
Min. Vent 7 SF
7 7
7 7
7 7
7 7
7 7
7 7
7 7
7 7
1 2
1 1
1 1
2 1
2 2
2 22
2 2
1 1
1 1
1 1
4 4
4 4
5 2 2
2 1 1
9.02 9.02
10' - 0"
3 3
1 12
D D
A A
B B
CC
2 3 4 5 6 7 9 10 118
82 SF
Stair 1
5949 SF
Level 1
82 SF
Stair 2
1548 SF
Egress Balcony
214 SF
Min. Light 17 SF
Min. Vent 9 SF
281 SF
Min. Light 22 SF
Min. Vent 11 SF
249 SF
Min. Light 20 SF
Min. Vent 10 SF
249 SF
Min. Light 20 SF
Min. Vent 10 SF
281 SF
Min. Light 22 SF
Min. Vent 11 SF
281 SF
Min. Light 22 SF
Min. Vent 11 SF
312 SF
Min. Light 25 SF
Min. Vent 12 SF
312 SF
Min. Light 25 SF
Min. Vent 12 SF
281 SF
Min. Light 22 SF
Min. Vent 11 SF
214 SF
Min. Light 17 SF
Min. Vent 9 SF
148 SF
Min. Light 12 SF
Min. Vent 6 SF
143 SF
Min. Light 11 SF
Min. Vent 6 SF
143 SF
Min. Light 11 SF
Min. Vent 6 SF
143 SF
Min. Light 11 SF
Min. Vent 6 SF
143 SF
Min. Light 11 SF
Min. Vent 6 SF
148 SF
Min. Light 12 SF
Min. Vent 6 SF
214 SF
Min. Light 17 SF
Min. Vent 9 SF
214 SF
Min. Light 17 SF
Min. Vent 9 SF
148 SF
Min. Light 12 SF
Min. Vent 6 SF
143 SF
Min. Light 11 SF
Min. Vent 6 SF
143 SF
Min. Light 11 SF
Min. Vent 6 SF
143 SF
Min. Light 11 SF
Min. Vent 6 SF
143 SF
Min. Light 11 SF
Min. Vent 6 SF
148 SF
Min. Light 12 SF
Min. Vent 6 SF
2 1 1
11 1 1
22 1
7 7
7 7
7 7
6A
6A
6A
6A
6B
6A
6A
7 7
7 6A 6A
6A6A
6B6A 6A
7 7
7 7
7 7
6A
6A
6A
6A
6A
6A
6B
< 50' PER CBC 1020.5 EXC. 2
19' - 9"
< 50' PER CBC 1020.5 EXC. 2
22' - 3"
< 50' PER CBC 1020.5 EXC. 2
19' - 9"
2 New 1-hour fire partition (party wall),
2x6 studs, 5/8" type 'X' gypsum
board both sides
New 1-hour fire partition (exterior corridor),
2x4 studs, stucco exterior, type 'X' gypsum
board interior
WALL TYPE LEGEND
1 3
Existing exterior wall, wood frame,
stucco exterior, gypsum board interior
Existing exterior wall, wood frame,
stucco both sides
Existing interior wall, wood frame,
gypsum board both sides
5 New 2x4 stud framed wall, stucco exterior,
5/8" type 'X' gypsum board interior
6A
New 1-hour fire partition (exterior corridor),
2x6 studs, stucco exterior, type 'X' gypsum
board interior
6B
7 /1 A3.1
/1 A3.1
/1 A3.1
/2 A3.1
4 Existing fire barrier, wood frame,
gypsum board both sides
Level 1
0"
Level 2
15' - 6"
Roof
25' - 6"
112 23456791011 8
Wall Area
4191 SF
Opening Area
736 SF
ALLOWABLE OPENING AREA ADJACENT TO PROPERTY LINE:
CBC TABLE 705.8
10' TO 15' FROM PROPERTY LINE, SPRINKLERED, UNPROTECTED OPENINGS = 45% MAX. 736 sf / 4191 sf = 17.6%
Scale
Set Date
Drawn By
Project Number
ALL DRAWINGS AND WRITTEN MATERIAL
APPEARING HEREIN CONSTITUTE ORIGINAL
AND UNPUBLISHED WORK OF THE
ARCHITECT AND MAY NOT BE DUPLICATED,
USED OR DISCLOSED WITHOUT WRITTEN
CONSENT OF ARCHITECT
SHEET NO.
1/8" = 1'-0"10/6/2025 10:59:06 AM
AA4.1
Building A Area Plans
Hotel Investment Group
Santa Fe Place Multi-Family
Author
Oct. 6, 2025
992952 & 958 Postal Way, Vista, CA 92083
Hotel Circle North, Suite 200, San Diego, CA 92108
1/8" = 1'-0"AA4.1
1 Level 1
1/8" = 1'-0"AA4.1
2 Level 2
Area Schedule (Code Analysis)
Level Name Area
Level 1 Level 1 6438 SF
L
evel 1 Covered Walkway 1005 SF
Level 1 Stair 1 58 SF
Level 1 Electrical 1 79 SF
Level 1 Electrical 2 79 SF
Level 1 Stair 2 58 SF
Level 1 WH 58 SF
Level 1 7773 SF
Level 2 Level 1 5949 SF
Level 2 Stair 2 82 SF
Level 2 Egress Balcony 1548 SF
Level 2 Stair 1 82 SF
Level 2 7661 SF
Grand Total 15434 SF
Unit Area Schedule
Name Area
101 A3 598 SF
1 02 A1 529 SF
103 A1 523 SF
104 A2 MF 523 SF
105 A1 523 SF
106 A2 MF 523 SF
107 A1 523 SF
108 A2 MF 523 SF
109 A1 523 SF
110 A2 MF 523 SF
111 A3 598 SF
112 A1 529 SF
Level 1 6438 SF
201 A4 452 SF
202 A4 452 SF
203 A5 518 SF
204 A5 518 SF
205 A6 549 SF
206 A5 485 SF
207 A6 549 SF
208 A5 485 SF
209 A5 518 SF
210 A5 518 SF
211 A5 452 SF
212 A4 452 SF
Level 2 5949 SF
Grand Total 12387 SF
Keynotes
9.02 (E) 5/8" TYPE 'X' GYPSUM BOARD AT WALLS AND CEILINGS UNDER STAIR. REPAIR AS NECESSARY TO FORM A COMPLETE TAPED
AND MUDDED MEMBRANE
1 1/8" = 1'-0"AA4.1
3 North Elevation Allowable Openings
No. Description Date
1 Plan Check 1,
c
oordination
7/8/24
3 Fire Dept, SDG&E,
Owner, Coord.
7/30/25
3 3
05/26/2026
C11
UP
FD
DN DN
FD
1 1
12 12
D D
A A
B B
CC
2 2
3 3
4 4
5 5
6 6
7 7
9 9
10 10
11 11
Unit A1
102 Unit A2 MF
104
Unit A2 MF
106
Unit A2 MF
108
Unit A2 MF
110
Unit A1
112
Unit A3
111
Unit A1
109
Unit A1
107
Unit A1
105
Unit A1
103
Unit A3
101
8 8
160' - 6"
3' - 6" 16' - 6" 6' - 9" 13' - 3" 10' - 0" 10' - 0" 13' - 3" 6' - 9" 16' - 6" 3' - 6" 50' - 0"
22' - 6" 22' - 6" 5' - 0"
5' - 0" 5' - 3" 20' - 0" 20' - 0" 20' - 0" 20' - 0" 20' - 0" 20' - 0" 20' - 0" 5' - 3" 5' - 0" 1 AA5.2
Elec
1 Telecom
2 WH
4 AA6.1
1 AA6.1
2 AA6.1
3 U1 U1 U1 U1 U1 U1
U1 U1 U1 U1 U1 U1
A4
A1
A2
G Ht G G Bt G G Ht G
G Ht G G G G Ht R
2 AA5.2
9' - 3" 10' - 9" 2' - 2" 4' - 7" 3' - 7" 9' - 8" 9' - 6" 3' - 9" 4' - 5" 2' - 4" 10' - 11" 9' - 1" Bt Bt Bt B
3' - 6" 16' - 6" 6' - 9" 13' - 3" 10' - 0" 10' - 0" 13' - 3" 6' - 9" 16' - 6" 3' - 6" 5' - 9 1/2" 7' - 5 1/2" 6' - 8" 3' - 4"6' - 0 1/2" 13' - 11 1/2" 3' - 4" 6' - 8" 7' - 5 1/2" 5' - 9 1/2" 13' - 11 1/2" 6' - 0 1/2"3' - 6" 13' - 0" B Bt B
13' - 0" 3' - 6"
3' - 6" 13' - 0" 13' - 0" 3' - 6"
3 AA5.2
9.02 9.02
M M
MM
23.04 10.07
23.0423.0423.0423.0423.04
23.04 23.04 23.04 23.04 23.04
14 A3.1
14 A3.1
19 A3.1
19 A3.1
U2 U2
3 3
AA4.2
3 10.09
3 10.09
3 26.11
26.12 21.01
22.05 3
3 8.07
1 1
12 12
D D
A A
B B
CC
2 2
3 3
4 4
5 5
6 6
7 7
9 9
10 10
11 11
2' - 1"2' - 1"
5' - 1"5' - 1"
2' - 1"2' - 1"
5' - 1"5' - 1"
4' - 11" 3' - 0" 4' - 2" 3' - 0" 4' - 11"
Unit A4
201
Unit A5
203
Unit A5
204
Unit A4
202
Unit A5
206
Unit A6
205
Unit A6
207
Unit A5
208
Unit A4
212
Unit A5
210
Unit A5
209
Unit A4
211
8 8
50' - 0"
22' - 6" 22' - 6" 5' - 0"
160' - 6"
5' - 0" 5' - 3" 20' - 0" 20' - 0" 20' - 0" 20' - 0" 20' - 0" 20' - 0" 20' - 0" 5' - 3" 5' - 0" 3' - 6" 16' - 6" 5' - 8" 14' - 4" 7' - 11" 4' - 2" 7' - 11" 14' - 4" 5' - 8" 16' - 6" 3' - 6" Corridor 1
221
Corridor 2
222
Corridor 3
223
Exit Balcony
224
1 AA5.2
AA6.2
1 AA6.2
2 AA6.2
3 U1R
U1R U1R
U1R
U1R U1R
U1RU1R
U1R
U1R U1R
U1R
H H H H H E
HEHHHHEH
14' - 6" 5' - 6" 5' - 6" 14' - 6"
17' - 3"5' - 3"
2 AA5.2
A A B
3' - 6" 16' - 6" 5' - 8" 14' - 4" 10' - 0" 10' - 0" 14' - 4" 5' - 8" 16' - 6" 3' - 6" 5' - 4 1/2" 8' - 7 1/2" 2' - 6" 5' - 8" 5' - 11" 8' - 5" 3' - 5" 6' - 7" 6' - 7" 3' - 5" 11' - 4" 3' - 0" 2' - 9" 2' - 11" 11' - 1" 5' - 5" B
5' - 4 1/2" 11' - 1 1/2" 3' - 4" 2' - 4" 5' - 9 1/2" 8' - 6 1/2"
B D D B H
8' - 6 1/2" 5' - 9 1/2" 2' - 6" 3' - 2" 11' - 1 1/2" 5' - 4 1/2"8' - 6" 11' - 6" 11' - 9" 8' - 3" E
3 AA5.2
OPERABLE WINDOWS ON LEVEL 2 ON THE NORTH SIDE OF THE BUILDING SHALL BE EQUIPPED WITH OPENING CONTROL OR FALL PROTECTION DEVICES CONFORMING TO ASTM F 2090. CBC 1015.8 SUCH DEVICES MAY BE INTEGRAL TO THE WINDOWS OR RETROFIT.
ANGEL VENTLOCK OR APPROVED EQUAL (www.angel-ventlock.com).
SINGLE ACTION AT HUNG WINDOWS. DUAL ACTION AT SLIDING WINDOWS. 1
23.0423.0423.0423.0423.0423.04
23.04 23.04 23.04 23.04 23.04 23.04
10.093 10.09
3 10.09
3 Floor Plan Notes
1. DIMENSIONS ARE FROM CENTERLINE OF GRID INTERSECTIONS OR FACE OF STUD, U.N.O.
2. INTERIOR NON-BEARING STUD WALLS FOR TYPE V-B 1-HR
CONSTRUCTION WITHIN INDIVIDUAL UNITS ARE 2x4 WOOD STUDS AT 24" O.C. U.N.O.
3. EXTERIOR STUD WALLS ARE EXISTING. FRAME-IN EXISTING
EXTERIOR OPENING WITH LUMBER OF THE SAME SIZE AND
SPACING.
4. PROVIDE BLOCKING AT ALL WALL STOPS, TV LOCATIONS, KITCHEN
CABINETS, VANITIES, HEADBOARDS, CEILING FANS, TOILET
ACCESSORIES, AND CLOSET SHELF & POLE.
5. PENETRATIONS OF FIRE-RESISTIVE WALLS, FLOOR/CEILINGS AND
ROOF CEILINGS SHALL BE PROTECTED WITH THROUGH
PENETRATION FIRE STOPS AND MEMBRANE PENETRATION FIRE
STOPS PER CBC 713. CAULK UNDER INTERIOR PARTY-WALL SILL PLATES.
6. SEE MECHANICAL, PLUMBING, AND ELECTRICAL SHEETS FOR
LOCATIONS AND SIZES OF ADDITIONAL WALL PENETRATIONS.
7. DO NOT SCALE DRAWINGS.
8. FOR FIRE RATINGS OF WALLS, SEE BUILDING AREA PLANS.
9. IN ACCESSIBLE UNITS THE HIGHEST AND LOWEST OPERABLE
PARTS OF ALL CONTROLS, DISPENSERS, RECEPTACLES, AND
OTHER OPERABLE EQUIPMENT, SHALL BE PLACED WITHIN 48" OF THE FLOOR BUT NOT LOWER THAN 15" FOR FORWARD REACH, OR
WITHIN 54" BUT NOT LESS THAN 9" FOR SIDE APPROACH.
ELECTRICAL AND COMMUNICATION EQUIPMENT RECEPTACLES ON
WALLS SHALL BE MOUNTED NO LOWER THAN 15" FROM THE FLOOR TO THE BOTTOM OF THE BOX.
10. MEMBRANE PENETRATIONS SHALL BE CONSTRUCTED PER DETAILS ON SHEET A3.
11. IN COMBUSTIBLE CONSTRUCTION, DRAFTSTOPPING SHALL BE
INSTALLED TO SUBDIVIDE FLOOR/CEILING ASSEMBLIES, PER CBC 718.3.
12. DRAFTSTOPPING MATERIALS SHALL NOT BE LESS THAN 1/2-INCH GYPSUM BOARD, 3/8 INCH WOOD STRUCTURAL PANEL, 3/8-INCH
PARTICLEBOARD, 1-INCH NOMINAL LUMBER, CEMENT FIBERBOARD,
BATTS OR BLANKETS OF MINERAL WOOL OR GLASS FIBER, OR
OTHER APPROVED MATERIALS ADEQUATELY SUPPORTED. THE
INTEGRITY OF DRAFTSTOPS SHALL BE MAINTAINED. CBC 718.3.1
13. SMOKE AND FIRE DAMPERS MUST BE INSTALLED IN THE
FOLLOWING LOCATIONS:
A. DUCT PENETRATIONS OF FIRE BARRIERS, EXCEPT EXIT
ENCLOSURES AND EXIT PASSAGEWAYS WHERE THEY ARE NOT
PERMITTED TO PENETRATE.
B. DUCTS PENETRATING SHAFTS.
C. DUCTS PENETRATING FIRE PARTITIONS AND FIRE RATED
CORRIDOR WALLS, EXCEPT THROUGH PENETRATIONS WHERE
THE DUCT IS 0.019" THICK STEEL WITH NO OPENINGS INTO THE CORRIDOR.
D. DUCTS PENETRATING SMOKE BARRIERS.
E. DUCTS PENETRATING HORIZONTAL ASSEMBLIES.
14. FIRE EXTINGUISHERS, SMOKE DETECTORS, & OTHER EMERGENCY DEVICES TO BE LOCATED PER LOCAL CODE. FIRE EXTINGUISHER CABINETS SHALL BE SEMI-RECESSED. INSTALL EXTERIOR FE
CABINETS PER DETAIL /21 A3.2
3 C
10 11
A3.2
16 A3.2
17 22.03
TYP.
OF (4)
A4
WH
4 22.04
Scale
Set Date
Drawn By
Project Number
ALL DRAWINGS AND WRITTEN MATERIAL
APPEARING HEREIN CONSTITUTE ORIGINAL
AND UNPUBLISHED WORK OF THE
ARCHITECT AND MAY NOT BE DUPLICATED,
USED OR DISCLOSED WITHOUT WRITTEN
CONSENT OF ARCHITECT
SHEET NO.
As indicated10/6/2025 10:59:12 AM
AA4.2
Building A Floor
Plans
Hotel Investment Group
Santa Fe Place Multi-Family
Author
Oct. 6, 2025
992952 & 958 Postal Way, Vista, CA 92083
Hotel Circle North, Suite 200, San Diego, CA 92108
1/8" = 1'-0"AA4.2
1 Level 1
1/8" = 1'-0"AA4.2
2 Level 2
Unit Type Schedule
Name Count
Unit A1 6
U
nit A2 MF 4
Unit A3 2
12 Unit A4 4
Unit A5 6
Unit A6 2
12 24
Keynotes
8.07 FIXED PANEL ADJACENT TO (E) GAS LINE
9.02 (E) 5/8" TYPE 'X' GYPSUM BOARD AT WALLS AND CEILINGS UNDER STAIR. REPAIR AS NECESSARY TO FORM A COMPLETE TAPED AND
MUDDED MEMBRANE
10.07 KNOX-VAULT SERIES 4400 KEY BOX, VERIFY FINAL LOCATION WITH FIRE DEPT. RECESS MOUNT AT 5'-0" ABOVE STANDING
SURFACE. PREMISES KEYS FOR ALL BUILDING AREAS (GRAND
MASTER SYSTEM KEYS) LABELED WITH APPROVED KEY TAGS
IDENTIFYING EACH DOOR OR AREA SERVED
10.09 FIRE EXTINGUISHER CABINET, RECESSED; 48" MAX. TO HIGHEST
OPERABLE PART
21.01 (E) FIRE SPRINKLER RISER
22.03 TANKLESS WATER HEATER PER PLUMBING
22.04 FLOOR DRAIN, TIE INTO (E) WASTE LINE NEAR GRID LINE C, SEE
PLUMBING
22.05 (E) GAS LINE ENTRY
23.04 FRAME OPENING FOR FUTURE 26" PTAC. PROVIDE POWER AND CONDENSATE IN SAME MANNER AS INSTALLED PTACs
26.11 NEMA 3R ENCLOSURE, SEE ELECTRICAL
26.12 (E) ELECTRICAL MAIN, SEE ELECTRICAL
1 NORTH
Window Schedule Bldg A
Count Type Mark Description Width Height
F
rame
Material Glass Light Vent Comments
2 A Horz Slider 6' - 6" 5' - 0" Dual Pane, Low-E 26.00 13.6 5 7 B Horz Slider 5' - 6" 5' - 0" Dual Pane, Low-E 22.00 11.55 5 Bt Horz Slider 5' - 6" 5' - 0" Dual Pane, Low-E, Tempered 22.00 11.55 2 D Horz Slider 5' - 0" 5' - 0" Dual Pane, Low-E 20.00 10.50 4 E Horz Slider 4' - 6" 5' - 0" Dual Pane, Low-E 18.00 9.45 11 G Sgl Hung 4' - 0" 5' - 0" Dual Pane, Low-E 14.60 8.00 12 H Sgl Hung 3' - 6" 5' - 0" Dual Pane, Low-E 12.78 7.00 4 Ht Sgl Hung 3' - 6" 5' - 0" Dual Pane, Low-E, Tempered 12.78 7.00 4 M Sgl Hung 2' - 6" 5' - 0" Dual Pane, Low-E 9.13 5.00 1 R Horz Slider 4' - 0" 5' - 0" Dual Pane, Low-E 16.00 8.40 No. Description Date
1 Plan Check 1,
c
oordination
7/8/24
3 Fire Dept, SDG&E,
Owner, Coord.
7/30/251/4" = 1'-0"AA4.2
3 Water Heater Plan
3 3
3 3
05/26/2026
C11
1 12
D
A
B
C
2 3 4 5 6 7 9 10 118
1 AA5.2
2 AA5.2
3 AA5.2
23.02 23.02
7.01 7.01
7.01 7.01
7.01 7.02
OPEN TO
BELOW
OPEN TO
BELOW
OPEN TO BELOW
Scale
Set Date
Drawn By
Project Number
ALL DRAWINGS AND WRITTEN MATERIAL
APPEARING HEREIN CONSTITUTE ORIGINAL
AND UNPUBLISHED WORK OF THE
ARCHITECT AND MAY NOT BE DUPLICATED,
USED OR DISCLOSED WITHOUT WRITTEN
CONSENT OF ARCHITECT
SHEET NO.
1/8" = 1'-0"10/6/2025 10:59:13 AM
AA4.3
Building A Roof Plan
Hotel Investment Group
Santa Fe Place Multi-Family
Author
Oct. 6, 2025
992952 & 958 Postal Way, Vista, CA 92083
Hotel Circle North, Suite 200, San Diego, CA 92108
1/8" = 1'-0"AA4.3
1 Roof
Keynotes
7.01 (E) ROOF TILE
7.02 (E) MEMBRANE ROOFING. PATCH AND REPAIR AS NEEDED AT NEW PENETRATIONS
23.02 GOOSENECK VENT, TYPICAL, SEE MECHANICAL
No. Description Date
05/26/2026
C11
Level 1
0"
Level 2
15' - 6"
Roof
25' - 6"
112 23456791011 8
7' - 0"2' - 0"2' - 0"7' - 0"
7.01 8.018.02
9.04 9.04
23.03 9.05
9.05 9.05
9.05 9.04 9.05 9.07
9.05 9.05
9.05 9.05
9.05 6
A3.2
7 A3.2
8 A3.2
10 A3.2
10 A3.2 SIM.
11 A3.2
12 A3.2
9.04 9.04
9' - 0" 10' - 0"
26.1026.11
3 3
Level 1
0"
Level 2
15' - 6"
Roof
25' - 6"
DA B C
7.01 9.04
9.04 6.12 6.08 5.02 8.02
6.07 6.09
9.03 10.04
3' - 6"
9.05 9.03
26.07 9.05
9.05 9.05 9.06
9.04 6.12
9.059.07
8' - 0"
6.12 26.10
15 A3.2
14 A3.2
14 A3.2
8' - 0"
4' - 0"
26.10 9.10
3 AA5.1
5 26.11
3 10' - 6"
22.05 Level 1
0"
Level 2
15' - 6"
Roof
25' - 6"
D ABC
7.01 5.028.02 9.04 6.12 6.08
9.04 6.07 6.09
9.03 10.04
9.05 9.06
6.12 9.05
9.10 9.05
26.07 9.04
9.05 9.07
8' - 0"
6.12 15
A3.2
14 A3.2
14 A3.2
8' - 0"
4' - 0"
26.10 3
Level 1
0"
Level 2
15' - 6"
Roof
25' - 6"
1 122 3 4 5 6 7 9 10 118
7.017.01
8.018.02 9.03 9.05 6.08
6.076.07
6.096.09
5.02 5.02
8.018.01
10.04 9.05
9.04 6.12
9.059.05
9.069.07
26.07 6.12 9.03 9.079.059.10
9.05 9.05
6.12 9.05
9.04 9.04
9.07 6.129.10
9.05 9.05
9.04 6.12
9.03 9.03 9.03
9.03 14
A3.2
14 A3.2
14 A3.2
14 A3.2
15 A3.2
3 3
26.11 3
Level 1
0"
17 A3.2
16 A3.2
18 A3.2
9.07 6.07
6.08 9.10
16 A3.2 SIM.
3 19
A3.2
22.06 Scale
Set Date
Drawn By
Project Number
ALL DRAWINGS AND WRITTEN MATERIAL
APPEARING HEREIN CONSTITUTE ORIGINAL
AND UNPUBLISHED WORK OF THE
ARCHITECT AND MAY NOT BE DUPLICATED,
USED OR DISCLOSED WITHOUT WRITTEN
CONSENT OF ARCHITECT
SHEET NO.
As indicated10/6/2025 11:00:19 AM
AA5.1
Building A Elevations
Hotel Investment Group
Santa Fe Place Multi-Family
Author
Oct. 6, 2025
992952 & 958 Postal Way, Vista, CA 92083
Hotel Circle North, Suite 200, San Diego, CA 92108
1/8" = 1'-0"AA5.1
1 North Elevation
1/8" = 1'-0"AA5.1
2 East Elevation
1/8" = 1'-0"AA5.1
3 West Elevation
1/8" = 1'-0"AA5.1
4 South Elevation
Keynotes
5.02 (E) FENCE AND GATE AT STAIRS
6.07 (E) WOOD POST, REPAINT, COLOR BROWN: SHERWIN WILLIAMS SW 6173, FLAT
6.08 (E) TWIN WOOD POST AND LINTEL, REPAINT, COLOR BROWN:
SHERWIN WILLIAMS SW 6173, FLAT
6.09 (E) WOOD BEAM, REPAINT, COLOR BROWN: SHERWIN WILLIAMS SW 6173, FLAT
6.12 DECORATIVE PVC LATTICE SCREEN, ACURIO LATTICEWORKS "ROMAN", OR APPROVED EQUAL
7.01 (E) ROOF TILE
8.01 WINDOW PER PLAN
8.02 DOOR PER PLAN
9.03 PAINTED STUCCO, MAIN BODY, WHITE: SHERWIN WILLIAMS SW 7013 IVORY COVE, FLAT
9.04 PAINTED STUCCO, ACCENT, GREEN (DOES NOT APPLY PER
PLANNING COMMISSION): SHERWIN WILLIAMS SW 9183 DARK
COVE, FLAT
9.05 PAINTED STUCCO, ACCENT TRIM, BROWN: SHERWIN WILLIAMS SW 6173, FLAT
9.06 MEDALLION: CORAFORM, CALIFORNIA 257 TRIM, CUT AND MITRE TO FORM 36" x 36" SQUARE, PAINTED COLOR 9.05
9.07 QUATREFOIL: CORAFORM, QUATREFOIL, 22" x 22", PAINTED COLOR 9.05
9.10 PAINTED STUCCO OVER 1-1/2"x5-1/2" FOAM TRIM, BROWN, SHERWIN WILLIAMS SW 6173, FLAT
10.04 BUILDING SIGNAGE, BRONZE
22.05 (E) GAS LINE ENTRY
22.06 FLUE VENT TERMINATION PER PLUMBING, PAINT TO MATCH
ADJACENT WALL COLOR
23.03 PTAC GRILLE PER MECHANICAL, PAINT TO MATCH
SURROUNDING BUILDING COLOR
26.07 COACH LANTERN, SEE ELECTRICAL
26.10 BRACKET LIGHT, SEE ELECTRICAL
26.11 NEMA 3R ENCLOSURE, SEE ELECTRICAL
1 No. Description Date
1 Plan Check 1,
c
oordination
7/8/24
3 Fire Dept, SDG&E,
Owner, Coord.
7/30/25
3 1/4" = 1'-0"AA5.1
5 Infill at (E) Arch
05/26/2026
C11
Level 1
0"
Level 2
15' - 6"
Roof
25' - 6"
DA B C
8' - 6"
6.01 6.02 6.03 6.056.05
3.02 6.05
6.01 6.01
6.06 23.02
9 A3.1
Level 1
0"
Level 2
15' - 6"
Roof
25' - 6"
DA B C
8' - 6"
8' - 6"
6.01 6.01
6.01 6.05 6.066.02 6.03
3.02 6.05
6.06 9.01
9.01 9
A3.1
5' - 4" +/-
Level 1
0"
Level 2
15' - 6"
Roof
25' - 6"
1 122 3 4 5 6 7 9 10 118
9 A3.1
Scale
Set Date
Drawn By
Project Number
ALL DRAWINGS AND WRITTEN MATERIAL
APPEARING HEREIN CONSTITUTE ORIGINAL
AND UNPUBLISHED WORK OF THE
ARCHITECT AND MAY NOT BE DUPLICATED,
USED OR DISCLOSED WITHOUT WRITTEN
CONSENT OF ARCHITECT
SHEET NO.
1/8" = 1'-0"10/6/2025 11:00:25 AM
AA5.2
Building A Sections
Hotel Investment Group
Santa Fe Place Multi-Family
Author
Oct. 6, 2025
992952 & 958 Postal Way, Vista, CA 92083
Hotel Circle North, Suite 200, San Diego, CA 92108
1/8" = 1'-0"AA5.2
1 Section 1
1/8" = 1'-0"AA5.2
2 Section 3
1/8" = 1'-0"AA5.2
3 Section 5
Keynotes
3.02 (E) CONCRETE SLAB
6.01 (E) ROOF FRAMING
6.02 (E) FLOOR FRAMING I-JOISTS 16" O.C.
6.03 (E) 18" GLULAM FLOOR BEAM
6.05 (E) 2x STUD WALL FRAMING
6.06 (E) DECK FRAMING
9.01 5/8" TYPE 'X' GYPSUM BOARD
23.02 GOOSENECK VENT, TYPICAL, SEE MECHANICAL
No. Description Date
05/26/2026
C11
SC
SC
SC
SC
SC
SC
B B
CC
9 9
10 10
23' - 6"
22' - 6"
20' - 0"
AA6.1
7 5' - 9" 16' - 9"
5' - 9" 4' - 0" 12' - 9"
8' - 1" 11' - 11"
10' - 8" 9' - 4"
U3
U2
U1
23.01 LIVING BEDROOM
BATH
23.04 22.02
10.08 9.09
26.08 B B
CC
7 7
23' - 3"
10' - 0" 13' - 3"
22' - 6"
AA6.1
8 1' - 7" 11' - 8"
4' - 0" 6' - 4" 2' - 11"
U1
U3
U2A
7' - 4" 15' - 2"
5' - 2"2' - 2"
8 A3.1
23.01 LIVING
BEDROOM
BATH
23.04 9.09
26.08 D D
CC
2 2
3 3
4 4
5' - 3" 20' - 0"
8' - 0" 12' - 0" 2' - 6"
22' - 6"
AA6.1
9 AA6.110
11' - 11" 8' - 1" 3' - 6"
12' - 2" 3' - 10" 6' - 6"
9' - 3" 2' - 8"
U3
23.01 LIVING
BEDROOM
BATH
23.04 22.02 10.08
9.09 26.08
1 6' - 8"
21"12"21"30"21"31"31"
3"10"38"36"18"27"27"8"
18" 66"
30" 18" 36"
40" 2" 4" 34"
30" 18"
6.10 36"
19"
11.01 11.02
11.04 11.06
22.02 40"
40" MAX.
38"
MIN. CLR.
29"
21"60"21"31"31"
MIN. CLR.
27"
3"10"33"36"18"54"8"
18" 66"
MAX.
34"
24" 12"
6 A3.1
4" 34" MAX.
7 A3.1
12 A3.1
6.10 11.01
11.02 11.04
11.06 42"
72"
18"
42"
54"36"43"21"27"27"8"
36"
12"21"12"21"32"38"21"31"32"
66"18"
11.01 11.02
11.06 11.04
B B
CC
9 9
10 10
2' - 4"
EQEQ
1 2' - 0"
28.01 GB
8' - 6"
GB
9' - 0"
GB
8' - 0" 9.08
EQ EQ
6' - 5"
EQ EQ
8' - 3" 7' - 1" 6' - 5"
EQ EQ EQ
1' - 10"
8.04 8.06
2 3
GB
8' - 6"
B B
CC
7 7
2' - 4"
EQ EQ
GB
8' - 0"
2' - 0"
GB
8' - 6"
28.01 GB
9' - 0"
1 9.08
EQ EQ EQ EQ
6' - 3"
EQ EQ EQ
6' - 3"7' - 3"8' - 3"
1' - 10"
8.04 8.06
2 3
3 D D
CC
2 2
3 3
4 4
2' - 4"
2' - 0"
GB
8' - 6"
GB
8' - 6"
GB
8' - 0"
28.01 1
9.08 EQ EQ EQ EQ
EQ EQ EQ EQ
6' - 3" 7' - 3" 8' - 3"
1' - 10"
EQ EQ
6' - 6"
8.04 8.06
2 3
3 6' - 8"
34"4"2"40"
6.10 36"
19"
22.02 KITCHENS AS DIMENSIONED ON ELEVATIONS
LIGHT SWITCHES 48" MAX. TO TOP OF BOX
RECEPTACLES 15" MIN. TO BOTTOM OF BOX
LIGHT SWITCHES AT VANITIES 42" TO CL
RECEPTACLES AT VANITIES 42" TO CL
Accessible Reach Ranges
Scale
Set Date
Drawn By
Project Number
ALL DRAWINGS AND WRITTEN MATERIAL
APPEARING HEREIN CONSTITUTE ORIGINAL
AND UNPUBLISHED WORK OF THE
ARCHITECT AND MAY NOT BE DUPLICATED,
USED OR DISCLOSED WITHOUT WRITTEN
CONSENT OF ARCHITECT
SHEET NO.
As indicated10/6/2025 11:00:30 AM
AA6.1
Building A Unit Plans
Hotel Investment Group
Santa Fe Place Multi-Family
Author
Oct. 6, 2025
992952 & 958 Postal Way, Vista, CA 92083
Hotel Circle North, Suite 200, San Diego, CA 92108
1/4" = 1'-0"AA6.1
1 Unit A1 Plan
1/4" = 1'-0"AA6.1
2 Unit A2 MF Plan
1/4" = 1'-0"AA6.1
3 Unit A3 Plan
3/8" = 1'-0"AA6.1
7 A1 Kitchen Bath Elevation
3/8" = 1'-0"AA6.1
8 A2 MF Kitchen Bath Elevation
3/8" = 1'-0"AA6.1
9 A3 Kitchen Elevation
1/4" = 1'-0"AA6.1
4 A1 Ceiling
1/4" = 1'-0"AA6.1
5 A2 MF Ceiling
1/4" = 1'-0"AA6.1
6 A3 Ceiling
Keynotes
6.10 PREFABRICATED WATER-RESISTANT TUB/SHOWER
SURROUND, MIN. 72" ABOVE DRAIN INLET
8.04 PROVIDE CEILING ACCESS DOOR IN EACH UNIT AT WATER
SHUTOFF VALVES, VERIFY SIZE AND LOCATION BEFORE
INSTALLATION
8.06 CEILING ACCESS PANEL WITH KEYED LOCK, 22"x30", BEST ACCESS DOORS 'BA-AHD' OR EQUIVALENT. PROVIDE 30"
SQUARE 1/2" PLYWOOD ADJACENT TO OPENING
9.08 5/8" TYPE 'X' MOISTURE RESISTANT GYPSUM BOARD
9.09 5/8" TYPE 'X' MOISTURE RESISTANT GYPSUM BOARD
BEHIND TUB/SHOWER SURROUND
10.08 SHOWER DOORS WITH SAFETY GLAZING CONFORMING TO
CBC 2406
11.01 REFRIGERATOR
11.02 GAS RANGE OVEN
11.04 RANGE HOOD EXHAUST
11.06 COUNTER TOP MICROWAVE
22.02 PREFABRICATED SHOWER PAN PER PLUMBING
23.01 PTAC PER MECHANICAL. PAINT PTAC GRILLE TO MATCH
SURROUNDING BUILDING COLOR
23.04 FRAME OPENING FOR FUTURE 26" PTAC. PROVIDE POWER
AND CONDENSATE IN SAME MANNER AS INSTALLED PTACs
26.08 ELECTRICAL SUB-PANEL, SEE ELECTRICAL
28.01 COMBINATION CARBON MONOXIDE SMOKE DETECTOR,
SEE ELECTRICAL
3/8" = 1'-0"AA6.1
10 A3 Bath Elevation
2 3/5/25
No. Description Date
1 Plan Check 1,
c
oordination
7/8/24
2 Coordination 3/12/25
3 Fire Dept, SDG&E,
Owner, Coord.
7/30/25
05/26/2026
C11
SC
SCSC
SC
SC
SC
B B
CC
9 9
10 10
20' - 0"
22' - 6"
20' - 5"2' - 1"
4' - 11" 17' - 7"
3' - 0"2' - 1"
20' - 0"
5' - 6" 14' - 6"
AA6.2
5 4
5' - 10" 14' - 7"
3' - 6" 8' - 1" 11' - 11"
5' - 2" 9' - 4"
VERIFY
5' - 2"
2' - 7" 9' - 4"
5' - 8" 3' - 10" 10' - 9"
U1R
U2
U3
23.01 LIVING
BEDROOM
BATH
23.04 22.02
10.08 9.09
26.08 B B
CC
7 7
22' - 6"
7' - 11" 14' - 4"
17' - 3"5' - 3"
3' - 0" 4' - 11" 14' - 4"
7' - 7" 6' - 9"
AA6.2
6 8' - 9" 13' - 9"
2' - 8" 11' - 8"
4' - 11" 6' - 9"
5' - 6" 1' - 3"
U1R U2
U3
23.01 LIVING
BEDROOM
BATH
23.04 10.08
9.09 26.08
22.02 D D
CC
6 6
14' - 4" 10' - 0"
22' - 6"
AA6.2
7 22' - 6"
6' - 9" 7' - 7"
1' - 3" 5' - 6"
13' - 9" 5' - 9" 3' - 0"
11' - 8" 2' - 8"
6' - 9" 4' - 11"
U2
U3
U1R
23.01 LIVING
BEDROOM
BATH
23.04 10.08
9.09 26.08
22.02 18" 66"
30" 38" 12" 12"
32" 30"
36"18"30"
11.01 11.06
30"21"32"24"
30" 18" 36"
12" 13" 31" 21"
36"
No drawer stack?
11.02 11.04
8"54"21"30"30"3"
32" 30" 21" 31" 31"
36"
18" 66"
11.06 11.02
11.01 11.04
32" 30" 21" 31" 31"
66"18"
30" 30" 21" 54" 8"
36"48"
11.06 11.02
11.01 11.04
B B
CC
9 9
10 10
EQ EQ
2' - 4"
28.01 1
GB
8' - 6"
GB
8' - 6"
GB
9' - 0"
9.08 EQ EQ
5' - 6"
2' - 8"
EQ EQ
5' - 4"
8.04 3
3 B B
CC
7 7
EQ EQ
2' - 4"
28.01 GB
8' - 6"
1 GB
9' - 0"
GB
8' - 6"
9.08 EQ EQ
5' - 4"
EQ EQ
7' - 0" 3' - 0"
EQ EQ EQ
8.04 3
3 D D
CC
6 6
EQ EQ
2' - 4"
28.01 GB
8' - 6"
1 GB
8' - 6"
9.08 GB
9' - 0"
EQ EQ EQ EQ
EQ EQ
9' - 5"12' - 4"
1' - 10"
EQ EQ EQ
5' - 5"
8.04 3
3 Scale
Set Date
Drawn By
Project Number
ALL DRAWINGS AND WRITTEN MATERIAL
APPEARING HEREIN CONSTITUTE ORIGINAL
AND UNPUBLISHED WORK OF THE
ARCHITECT AND MAY NOT BE DUPLICATED,
USED OR DISCLOSED WITHOUT WRITTEN
CONSENT OF ARCHITECT
SHEET NO.
As indicated10/6/2025 11:00:35 AM
AA6.2
Building A Unit Plans
Hotel Investment Group
Santa Fe Place Multi-Family
Author
Oct. 6, 2025
992952 & 958 Postal Way, Vista, CA 92083
Hotel Circle North, Suite 200, San Diego, CA 92108
1/4" = 1'-0"AA6.2
1 Unit A4 Plan
1/4" = 1'-0"AA6.2
2 Unit A5 Plan
1/4" = 1'-0"AA6.2
3 Unit A6 Plan
3/8" = 1'-0"AA6.2
4 A4 Kitchen Elevation A
3/8" = 1'-0"AA6.2
5 A4 Kitchen Elevation B
3/8" = 1'-0"AA6.2
6 A5 Kitchen Elevation
3/8" = 1'-0"AA6.2
7 A6 Kitchen Bath Elevation
1/4" = 1'-0"AA6.2
8 A4 Ceiling
1/4" = 1'-0"AA6.2
9 A5 Ceiling
1/4" = 1'-0"AA6.2
10 A6 Ceiling
Keynotes
8.04 PROVIDE CEILING ACCESS DOOR IN EACH UNIT AT
WATER SHUTOFF VALVES, VERIFY SIZE AND LOCATION
BEFORE INSTALLATION
9.08 5/8" TYPE 'X' MOISTURE RESISTANT GYPSUM BOARD
9.09 5/8" TYPE 'X' MOISTURE RESISTANT GYPSUM BOARD
BEHIND TUB/SHOWER SURROUND
10.08 SHOWER DOORS WITH SAFETY GLAZING CONFORMING
TO CBC 2406
11.01 REFRIGERATOR
11.02 GAS RANGE OVEN
11.04 RANGE HOOD EXHAUST
11.06 COUNTER TOP MICROWAVE
22.02 PREFABRICATED SHOWER PAN PER PLUMBING
23.01 PTAC PER MECHANICAL. PAINT PTAC GRILLE TO MATCH
SURROUNDING BUILDING COLOR
23.04 FRAME OPENING FOR FUTURE 26" PTAC. PROVIDE
POWER AND CONDENSATE IN SAME MANNER AS
INSTALLED PTACs
26.08 ELECTRICAL SUB-PANEL, SEE ELECTRICAL
28.01 COMBINATION CARBON MONOXIDE SMOKE DETECTOR,
SEE ELECTRICAL
No. Description Date
1 Plan Check 1,
c
oordination
7/8/24
3 Fire Dept, SDG&E,
Owner, Coord.
7/30/25
05/26/2026
C11
SCSC
SC
SC
SC
SC
SC
SC SC
SC SC
SC SC
SC SC
SC
SC
SC SC
SCSC
SC
SC
SC
SC
SCSC
SC
SC SC SC
SC
SC SC
SC
SC
SC
SC
SC
SCSC
SC
SC
SC
SC
SC
SC
SC
1 1
12 12
D D
A A
B B
CC
2 2
3 3
4 4
5 5
6 6
7 7
9 9
10 10
11 11
8 8
1 AA5.2
2 AA5.2
GB
8' - 6"
GB
8' - 6"
GB
8' - 6"
GB
8' - 6"
GB
8' - 6"
GB
8' - 6"
GB
8' - 6"
GB
8' - 6"
GB
8' - 6"
GB
8' - 6"
GB
8' - 6"
GB
8' - 6"
AA6.1
4AA6.1
5 AA6.1
6 3
AA5.2
GB
8' - 0"
GB
8' - 0"
GB
8' - 0"
GB
8' - 0"
GB
8' - 0"
GB
8' - 0"
GB
8' - 0"
GB
8' - 0"
GB
8' - 0"
GB
8' - 0"
GB
8' - 0"
GB
8' - 0"3
3 3
1 1
12 12
D D
A A
B B
CC
2 2
3 3
4 4
5 5
6 6
7 7
9 9
10 10
11 11
8 8
1 AA5.2
2 AA5.2
EQ EQ
EQEQ
2' - 7"2' - 8"
GB
8' - 6"
ST
8' - 0"
GB
8' - 6"
GB
8' - 6"
GB
8' - 6"
GB
8' - 6"
GB
8' - 6"
GB
8' - 6"
GB
8' - 6"
GB
8' - 6"
GB
8' - 6"
GB
8' - 6"
GB
8' - 6"
ST
8' - 0"
AA6.2
8 AA6.2
9 AA6.2
10 3
AA5.2
3 Scale
Set Date
Drawn By
Project Number
ALL DRAWINGS AND WRITTEN MATERIAL
APPEARING HEREIN CONSTITUTE ORIGINAL
AND UNPUBLISHED WORK OF THE
ARCHITECT AND MAY NOT BE DUPLICATED,
USED OR DISCLOSED WITHOUT WRITTEN
CONSENT OF ARCHITECT
SHEET NO.
1/8" = 1'-0"10/6/2025 11:00:40 AM
AA7
Building A Ceiling
Plans
Hotel Investment Group
Santa Fe Place Multi-Family
Author
Oct. 6, 2025
992952 & 958 Postal Way, Vista, CA 92083
Hotel Circle North, Suite 200, San Diego, CA 92108
1/8" = 1'-0"AA7
1 Level 1 Ceiling
1/8" = 1'-0"AA7
2 Level 2 Ceiling
No. Description Date
3 Fire Dept, SDG&E,
O
wner, Coord.
7/30/25
05/26/2026
C11
WH
WHWH
WH
WH
WH WH
1 1
12 12
D D
A A
B B
CC
2 2
3 3
4 4
5 5
6 6
7 7
9 9
10 10
11 11
8 8
Elec
1 Telecom
2 BathBath
7' - 3" 4' - 10 3/4"
3' - 2 1/2"
11 3/4"
3' - 8" 2' - 8" 7' - 1" 5' - 1 1/4" 5' - 1 3/4" 4' - 2" 4' - 2" 4' - 0" 7' - 8" 3' - 5 1/4" 5 3/4"
12' - 2"
5 3/4"
3' - 5 1/4" 7' - 6" 4' - 2" 4' - 0" 4' - 4" 5' - 1 3/4" 5' - 1 1/4" 7' - 1"
2' - 8" 3' - 8"
11 3/4"
3' - 2 1/2" 5' - 0 3/4" 7' - 1"
3' - 2 3/4" 16' - 9 1/4" 20' - 0"
2' - 3 1/4"
4' - 0" 13' - 8 3/4" 2 3/4" 19' - 6 1/2" 2 3/4" 13' - 8 3/4" 4' - 1 1/4" 2' - 2" 3' - 0 3/4"
16' - 11 1/4" 16' - 9 1/4" 3' - 2 3/4"
5.04 5.045.04
5.045.04
5.04 (E) CONDITIONS IN
THIS SUITE ARE
UNCLEAR, BUT
ALL INTERIOR
WALLS, WINDOWS
AND DOORS WILL
BE DEMOLISHED
1 1
12 12
D D
A A
B B
CC
2 2
3 3
4 4
5 5
6 6
7 7
9 9
10 10
11 11
8 8
13' - 7" 0"
6' - 5"
3' - 10" 7' - 9 1/2" 4' - 1 1/2" 3' - 6" 9" 20' - 0" 2" 7' - 7" 12' - 3" 9' - 7" 4' - 3" 1' - 6"
3' - 6"
1' - 2"
3' - 7" 10' - 3" 6' - 2" 9" 4' - 6" 8' - 3" 3' - 6" 3' - 0" 6' - 9" 13' - 3" 1' - 7" 4' - 4 1/4" 14' - 0 3/4" 7' - 2" 6' - 0" 5' - 10 3/4" 11 1/4"
14' - 0 3/4" 4' - 6 1/4" 1' - 5" 7' - 0" 6' - 6" 6' - 6"
5.04 5.04
5.04 5.04
5.045.04
Scale
Set Date
Drawn By
Project Number
ALL DRAWINGS AND WRITTEN MATERIAL
APPEARING HEREIN CONSTITUTE ORIGINAL
AND UNPUBLISHED WORK OF THE
ARCHITECT AND MAY NOT BE DUPLICATED,
USED OR DISCLOSED WITHOUT WRITTEN
CONSENT OF ARCHITECT
SHEET NO.
1/8" = 1'-0"10/6/2025 11:00:42 AM
AAD1
Building A Demolition
Plans
Hotel Investment Group
Santa Fe Place Multi-Family
Author
Oct. 6, 2025
992952 & 958 Postal Way, Vista, CA 92083
Hotel Circle North, Suite 200, San Diego, CA 92108
1/8" = 1'-0"AAD1
1 Level 1 Demo
1/8" = 1'-0"AAD1
2 Level 2 Demo
Keynotes
5.04 (E) STEEL PIPE COLUMN, PROTECT IN PLACE
No. Description Date
05/26/2026
C11
W
D
WH
WH
C
34 2
5 6
7 1
E
F
B
A
D
B'
A'
1053 SF
Level 1 Left
1111 SF
Covered Walkway 1961 SF
Level 1 Right
79 SF
Mechanical
305 SF
Covered Walkway
64 SF
Storage
42 SF
Covered
59 SF
Stair 2
2 1
2 2
1 2
1 1
4 3
1 7
7 7
1 1
2 1
1 2 2
1 1
2 1
4 7
7 7
7 3
1 3
1 1
56 SF
Elec
4 1
2 1
159 SF
Min. Light 13 SF
Min. Vent 6 SF
153 SF
Min. Light 12 SF
Min. Vent 6 SF
242 SF
Min. Light 19 SF
Min. Vent 10 SF
172 SF
Min. Light 14 SF
Min. Vent 7 SF
273 SF
Min. Light 22 SF
Min. Vent 11 SF
226 SF
Min. Light 18 SF
Min. Vent 9 SF
138 SF
Min. Light 11 SF
Min. Vent 6 SF
130 SF
Min. Light 10 SF
Min. Vent 5 SF
130 SF
Min. Light 10 SF
Min. Vent 5 SF
142 SF
Min. Light 11 SF
Min. Vent 6 SF
268 SF
Min. Light 21 SF
Min. Vent 11 SF
226 SF
Min. Light 18 SF
Min. Vent 9 SF
80 SF
Electrical
1 9.02
9.02 4
1 1
3 3
2 2
1 1
C
34 2
5 6
7 1
E
F
B
A
D
B'
A'
982 SF
Level 2 Left
1453 SF
Egress Balcony
1800 SF
Level 2 Right110 SF
Stair 1
105 SF
Stair 2
2 2
1 1 2
2 2
2 2
2 2
2 1
1 2
1 1
1 1
7 7
7 7
77 2
2 2
2 2
2 149 SF
Min. Light 12 SF
Min. Vent 6 SF
149 SF
Min. Light 12 SF
Min. Vent 6 SF
245 SF
Min. Light 20 SF
Min. Vent 10 SF
245 SF
Min. Light 20 SF
Min. Vent 10 SF
130 SF
Min. Light 10 SF
Min. Vent 5 SF
130 SF
Min. Light 10 SF
Min. Vent 5 SF
130 SF
Min. Light 10 SF
Min. Vent 5 SF
130 SF
Min. Light 10 SF
Min. Vent 5 SF
216 SF
Min. Light 17 SF
Min. Vent 9 SF
216 SF
Min. Light 17 SF
Min. Vent 9 SF
216 SF
Min. Light 17 SF
Min. Vent 9 SF
216 SF
Min. Light 17 SF
Min. Vent 9 SF
1 1
1 1
2 New 1-hour fire partition (party wall),
2x6 studs, 5/8" type 'X' gypsum
board both sides
New 1-hour fire partition (exterior corridor),
2x4 studs, stucco exterior, type 'X' gypsum
board interior
WALL TYPE LEGEND
1 3
Existing exterior wall, wood frame,
stucco exterior, gypsum board interior
Existing exterior wall, wood frame,
stucco both sides
Existing interior wall,
gypsum board both sides
5 New 2x4 stud framed wall, stucco exterior,
5/8" type 'X' gypsum board interior
6A
New 1-hour fire partition (exterior corridor),
2x6 studs, stucco exterior, type 'X' gypsum
board interior
6B
7 1 / A3
1 / A3
1 / A3
2 / A3
4 Existing fire barrier, wood frame,
gypsum board both sides
Scale
Set Date
Drawn By
Project Number
ALL DRAWINGS AND WRITTEN MATERIAL
APPEARING HEREIN CONSTITUTE ORIGINAL
AND UNPUBLISHED WORK OF THE
ARCHITECT AND MAY NOT BE DUPLICATED,
USED OR DISCLOSED WITHOUT WRITTEN
CONSENT OF ARCHITECT
SHEET NO.
1/8" = 1'-0"10/6/2025 11:05:02 AM
AB4.1
Building B Area Plans
Hotel Investment Group
Sante Fe Place Multi-Family
Author
Oct. 6, 2025
992958 Postal Way, Vista CA
1650 Hotel Circle North, Suite 200, San Diego, CA 92108 1/8" = 1'-0"AB4.1
1 Level 1
1/8" = 1'-0"AB4.1
2 Level 2
Area Schedule (Code Analysis)
Level Name Area
Level 1 Covered 42 SF
L
evel 1 Covered Walkway 1111 SF
Level 1 Covered Walkway 305 SF
Level 1 Elec 56 SF
Level 1 Electrical 80 SF
Level 1 Level 1 Left 1053 SF
Level 1 Level 1 Right 1961 SF
Level 1 Mechanical 79 SF
Level 1 Stair 1 57 SF
Level 1 Stair 2 59 SF
Level 1 Storage 64 SF
Level 1 4868 SF
Level 2 Egress Balcony 1453 SF
Level 2 Level 2 Left 982 SF
Level 2 Level 2 Right 1800 SF
Level 2 Private Decks 304 SF
Level 2 Stair 1 110 SF
Level 2 Stair 2 105 SF
Level 2 4755 SF
Grand Total 9622 SF
Unit Area Schedule
Name Area
101 B1 450 SF
1 02 B2 541 SF
103 B3 521 SF
104 B1 450 SF
105 B4 491 SF
106 B5 402 SF
Level 1 2854 SF
201 B1 450 SF
202 B1 450 SF
203 B6 450 SF
203 Private Deck 155 SF
204 B6 450 SF
204 Private Deck 153 SF
205 B7 491 SF
206 B7 491 SF
Level 2 3089 SF
Grand Total 5944 SF
Keynotes
9.02 (E) 5/8" TYPE 'X' GYPSUM BOARD AT WALLS AND CEILINGS UNDER STAIR. REPAIR AS NECESSARY TO FORM A COMPLETE TAPED AND
MUDDED MEMBRANE
1 Keep 26" PTAC these two rooms.
NORTH
No. Description Date
1 Plan Check 1,
c
oordination
7/8/24
05/26/2026
C11
UP
W
D
WH
WH
DN
DN
C C
3 3
4 4
2 2
5 6
6 7
7 1
1 E
F
B
A
D
B'
A'
Unit B1
116
6' - 0" 22' - 6" 22' - 6" 6' - 0"
Unit B1
113
Unit B3
115
Unit B2
114
15' - 0"
15' - 0"
40' - 3"
30' - 0"
10' - 3"
15' - 0"
15' - 0"
2 AB5.2
57' - 0"
50' - 3"
20' - 0" 20' - 0" 10' - 3"
30' - 0"
10' - 3"
38' - 10"
5' - 6"
33' - 4"
20' - 0" 20' - 0" 10' - 3"
5' - 0" 5' - 4" 4' - 11"
Unit B4
117
Unit B5
118
AB6.2
1 AB6.1
1 1
AB5.2
U1U1
U1 U1
B2
B3
B4
B5
U1
U1
B6
B1 Elec
1 Water Heater
2 Laundry
6 Storage
3 Telecom
4 Storage
5 D
H
K
M
H H
G
3 AB5.2
9.02 9.02
E
D
Pt
J
D
G
23.04 10.07
23.04 23.04
23.04 23.04
23.04 -
---
-
---
14 A3.1
19 A3.1
-
---
-
---
14 A3.1
19 A3.1
22.01 22.01
2 2/18/25
10.09 3
10.09 3
10.09 3
26.12 C
3 3
4 4
2 2
5 6
6 7
7 1
1 E
F
B
A
D
B'
A'
PRIVATE
BALCONY
AB6.1
3 2
AB5.2
EGRESS BALCONY
EGRESS BALCONY
EGRESS
BALCONY
EGRESS BALCONY
Unit B1
213
Unit B1
214
Unit B6
216
Unit B6
215
Unit B7
217
Unit B7
218
50' - 3"
20' - 0" 20' - 0" 10' - 3"
6' - 0" 22' - 6" 22' - 6" 6' - 0"
57' - 0"
20' - 0" 20' - 0" 10' - 3"
5' - 4" 4' - 11"5' - 0"
40' - 3"
30' - 0"
10' - 3"
15' - 0"
15' - 0"
5' - 6"
33' - 4"
38' - 10"
30' - 0"
10' - 3"
15' - 0"
15' - 0"
AB6.3
1 1
AB5.2
U1
U1U1
U1
U1
U1
EE
K K
L
F
F
D
D
X
3 AB5.2
K
Nt
F
Q Q
23.04 23.04
23.04 23.04
23.04 K
10.09 3
10.093
10.093
C
34 2
5 6
7 1
E
F
B
A
D
B'
A'
2 AB5.2
OPEN
OPEN
1 AB5.2
23.02 23.02
23.02 7.01
7.01 7.01
7.01 7.02
7.01 7.01
7.01 7.02
3 AB5.2
Floor Plan Notes
1. DIMENSIONS ARE FROM CENTERLINE OF GRID INTERSECTIONS OR FACE OF STUD, U.N.O.
2. INTERIOR NON-BEARING STUD WALLS FOR TYPE V-B 1-HR
CONSTRUCTION WITHIN INDIVIDUAL UNITS ARE 2x4 WOOD STUDS AT 24" O.C. U.N.O.
3. EXTERIOR STUD WALLS ARE EXISTING. FRAME-IN EXISTING
EXTERIOR OPENING WITH LUMBER OF THE SAME SIZE AND
SPACING.
4. PROVIDE BLOCKING AT ALL WALL STOPS, TV LOCATIONS, KITCHEN
CABINETS, VANITIES, HEADBOARDS, CEILING FANS, TOILET
ACCESSORIES, AND CLOSET SHELF & POLE.
5. PENETRATIONS OF FIRE-RESISTIVE WALLS, FLOOR/CEILINGS AND
ROOF CEILINGS SHALL BE PROTECTED WITH THROUGH
PENETRATION FIRE STOPS AND MEMBRANE PENETRATION FIRE
STOPS PER CBC 713. CAULK UNDER INTERIOR PARTY-WALL SILL PLATES.
6. SEE MECHANICAL, PLUMBING, AND ELECTRICAL SHEETS FOR
LOCATIONS AND SIZES OF ADDITIONAL WALL PENETRATIONS.
7. DO NOT SCALE DRAWINGS.
8. FOR FIRE RATINGS OF WALLS, SEE BUILDING AREA PLANS.
9. IN ACCESSIBLE UNITS THE HIGHEST AND LOWEST OPERABLE
PARTS OF ALL CONTROLS, DISPENSERS, RECEPTACLES, AND
OTHER OPERABLE EQUIPMENT, SHALL BE PLACED WITHIN 48" OF THE FLOOR BUT NOT LOWER THAN 15" FOR FORWARD REACH, OR
WITHIN 54" BUT NOT LESS THAN 9" FOR SIDE APPROACH.
ELECTRICAL AND COMMUNICATION EQUIPMENT RECEPTACLES ON
WALLS SHALL BE MOUNTED NO LOWER THAN 15" FROM THE FLOOR TO THE BOTTOM OF THE BOX.
10. MEMBRANE PENETRATIONS SHALL BE CONSTRUCTED PER DETAILS ON SHEET A3.
11. IN COMBUSTIBLE CONSTRUCTION, DRAFTSTOPPING SHALL BE
INSTALLED TO SUBDIVIDE FLOOR/CEILING ASSEMBLIES, PER CBC 718.3.
12. DRAFTSTOPPING MATERIALS SHALL NOT BE LESS THAN 1/2-INCH GYPSUM BOARD, 3/8 INCH WOOD STRUCTURAL PANEL, 3/8-INCH
PARTICLEBOARD, 1-INCH NOMINAL LUMBER, CEMENT FIBERBOARD,
BATTS OR BLANKETS OF MINERAL WOOL OR GLASS FIBER, OR
OTHER APPROVED MATERIALS ADEQUATELY SUPPORTED. THE
INTEGRITY OF DRAFTSTOPS SHALL BE MAINTAINED. CBC 718.3.1
13. SMOKE AND FIRE DAMPERS MUST BE INSTALLED IN THE
FOLLOWING LOCATIONS:
A. DUCT PENETRATIONS OF FIRE BARRIERS, EXCEPT EXIT
ENCLOSURES AND EXIT PASSAGEWAYS WHERE THEY ARE NOT
PERMITTED TO PENETRATE.
B. DUCTS PENETRATING SHAFTS.
C. DUCTS PENETRATING FIRE PARTITIONS AND FIRE RATED
CORRIDOR WALLS, EXCEPT THROUGH PENETRATIONS WHERE
THE DUCT IS 0.019" THICK STEEL WITH NO OPENINGS INTO THE CORRIDOR.
D. DUCTS PENETRATING SMOKE BARRIERS.
E. DUCTS PENETRATING HORIZONTAL ASSEMBLIES.
14. FIRE EXTINGUISHERS, SMOKE DETECTORS, & OTHER EMERGENCY DEVICES TO BE LOCATED PER LOCAL CODE. FIRE EXTINGUISHER CABINETS SHALL BE SEMI-RECESSED. INSTALL EXTERIOR FE
CABINETS PER DETAIL 21/A3.2. 3
Scale
Set Date
Drawn By
Project Number
ALL DRAWINGS AND WRITTEN MATERIAL
APPEARING HEREIN CONSTITUTE ORIGINAL
AND UNPUBLISHED WORK OF THE
ARCHITECT AND MAY NOT BE DUPLICATED,
USED OR DISCLOSED WITHOUT WRITTEN
CONSENT OF ARCHITECT
SHEET NO.
1/8" = 1'-0"10/6/2025 11:05:04 AM
AB4.2
Building B Floor
Plans
Hotel Investment Group
Sante Fe Place Multi-Family
Author
Oct. 6, 2025
992958 Postal Way, Vista CA
1650 Hotel Circle North, Suite 200, San Diego, CA 92108 1/8" = 1'-0"AB4.2
1 Level 1
1/8" = 1'-0"AB4.2
2 Level 2
1/8" = 1'-0"AB4.2
3 Roof
Keynotes
7.01 (E) ROOF TILE
7.02 (E) MEMBRANE ROOFING. PATCH AND REPAIR AS NEEDED AT NEW
PENETRATIONS
9.02 (E) 5/8" TYPE 'X' GYPSUM BOARD AT WALLS AND CEILINGS UNDER STAIR. REPAIR
AS NECESSARY TO FORM A COMPLETE TAPED AND MUDDED MEMBRANE
10.07 KNOX-VAULT SERIES 4400 KEY BOX, VERIFY FINAL LOCATION WITH FIRE DEPT.
RECESS MOUNT AT 5'-0" ABOVE STANDING SURFACE. PREMISES KEYS FOR ALL
BUILDING AREAS (GRAND MASTER SYSTEM KEYS) LABELED WITH APPROVED KEY
TAGS IDENTIFYING EACH DOOR OR AREA SERVED
10.09 FIRE EXTINGUISHER CABINET, RECESSED; 48" MAX. TO HIGHEST OPERABLE PART
22.01 WATER HEATER PER PLUMBING
23.02 GOOSENECK VENT, TYPICAL, SEE MECHANICAL
23.04 FRAME OPENING FOR FUTURE 26" PTAC. PROVIDE POWER AND CONDENSATE IN SAME MANNER AS INSTALLED PTACs
26.12 (E) ELECTRICAL MAIN, SEE ELECTRICAL
1 Window Schedule
Count
T
ype
Mark Description Width Height
Frame
Material Glass Light Vent Comments
5 D Horz Slider 5' - 0" 5' - 0" Dual Pane, Low-E 20.00 10.5 0 3 E Horz Slider 4' - 6" 5' - 0" Dual Pane, Low-E 18.00 9.45 3 F Horz Slider 4' - 0" 4' - 0" Dual Pane, Low-E 12.80 6.72 2 G Sgl Hung 4' - 0" 5' - 0" Dual Pane, Low-E 14.60 8.00 3 H Sgl Hung 3' - 6" 5' - 0" Dual Pane, Low-E 12.78 7.00 1 J Sgl Hung 3' - 0" 6' - 0" Dual Pane, Low-E 13.32 7.20 5 K Sgl Hung 3' - 0" 5' - 0" Dual Pane, Low-E 11.10 6.00 1 L Sgl Hung 3' - 0" 4' - 0" Dual Pane, Low-E 8.88 4.80 1 M Sgl Hung 2' - 6" 5' - 0" Dual Pane, Low-E 9.13 5.00 1 Nt Sgl Hung 2' - 0" 5' - 0" Dual Pane, Low-E, Tempered 7.30 4.00 1 Pt Fixed 2' - 0" 5' - 0" Dual Pane, Low-E, Tempered
2 Q Sgl Hung 2' - 0" 4' - 0" Dual Pane, Low-E 5.92 3.20 1 X Fixed 4' - 0" 5' - 0" AL Existing Existing
NORTH
No. Description Date
1 Plan Check 1,
c
oordination
7/8/24
2 Coordination 3/12/25
3 Fire Dept, SDG&E,
Owner, Coord.
7/30/25
3 05/26/2026
C11
Level 1
0"
Level 2
15' - 6"
Roof
25' - 6"
34 2 1
7.01 6.07
6.09 8.02 8.019.03
7.01 6.09
6.07 6.07
8.01 9.03 23.0310.06
9.04 9.05
9.07 9.05
9.04 9.04
9.05 9.05
6.12 6.12
-
---
14 A3.2 -
---
14 A3.2
Level 1
0"
Level 2
15' - 6"
Roof
25' - 6"
D B' A'
9.03 8.028.01
9.03 7.01
6.07 7.017.01
6.07 6.09
9.03 10.04
10.06 9.05
9.04 9.04
9.06 9.05
9.039.05
9.04 9.05
6.12 6.12
9.05 -
---
15 A3.2
-
---
14 A3.2
8' - 0"
4' - 0"
26.10 26.10
Level 1
0"
Level 2
15' - 6"
Roof
25' - 6"
3 421
7.01 9.03
9.036.08 8.02 8.01
9.03 6.09
6.07 6.07
9.03 7.01
7.01 6.07
9.05 9.04
9.05 9.059.07 9.07
9.05 9.05
9.04 9.03
9.04 9.06
9.05 6.12
6.12 9.059.05
9.05 -
---
14 A3.2
-
---
14 A3.2
Level 1
0"
Level 2
15' - 6"
Roof
25' - 6"
567
7.01 6.07
9.03 8.02
8.028.01 7.01
6.07 6.096.09
9.03 8.01
23.03 9.04
9.05 9.05 9.05
9.07 9.04
9.04 9.056.12 6.12
-
---
14 A3.2
-
---
14 A3.2
Level 1
0"
Level 2
15' - 6"
Roof
25' - 6"
C E FBA
7.01 9.03
6.07 6.09 7.01
6.07 8.01
8.028.02 9.03
10.04 10.06
9.05 9.06
9.04 9.07
9.05 9.05
9.04 9.05
9.03 6.12
6.12 -
---
15 A3.2
-
---
14 A3.2
8' - 0"
4' - 0"
26.10 Level 1
0"
Level 2
15' - 6"
Roof
25' - 6"
5 6 7
9.03 8.028.01
9.03 7.01
6.07 10.07
9.04 9.05
9.07 9.04
9.05 9.05
9.05 9.05
Scale
Set Date
Drawn By
Project Number
ALL DRAWINGS AND WRITTEN MATERIAL
APPEARING HEREIN CONSTITUTE
ORIGINAL AND UNPUBLISHED WORK OF
THE ARCHITECT AND MAY NOT BE
DUPLICATED, USED OR DISCLOSED
WITHOUT WRITTEN CONSENT OF
ARCHITECT
SHEET NO.
1/8" = 1'-0"10/6/2025 11:06:01 AM
AB5.1
Building B Elevations
Hotel Investment Group
Sante Fe Place Multi-Family
Author
Oct. 6, 2025
992958 Postal Way, Vista CA
1650 Hotel Circle North, Suite 200, San Diego, CA 92108 1/8" = 1'-0"AB5.1
1 South Elevation Right
1/8" = 1'-0"AB5.1
3 West Elevation
1/8" = 1'-0"AB5.1
4 North Elevation Right
1/8" = 1'-0"AB5.1
5 South Elevation Left
1/8" = 1'-0"AB5.1
2 East Elevation
1/8" = 1'-0"AB5.1
6 North Elevation Left
1 Keynotes
6.07 (E) WOOD POST, REPAINT, COLOR BROWN: SHERWIN WILLIAMS SW 6173, FLAT
6.08 (E) TWIN WOOD POST AND LINTEL, REPAINT, COLOR BROWN:
SHERWIN WILLIAMS SW 6173, FLAT
6.09 (E) WOOD BEAM, REPAINT, COLOR BROWN: SHERWIN WILLIAMS SW 6173, FLAT
6.12 DECORATIVE PVC LATTICE SCREEN, ACURIO LATTICEWORKS "ROMAN", OR APPROVED EQUAL
7.01 (E) ROOF TILE
8.01 WINDOW PER PLAN
8.02 DOOR PER PLAN
9.03 PAINTED STUCCO, MAIN BODY, WHITE: SHERWIN WILLIAMS SW 7013 IVORY COVE, FLAT
9.04 PAINTED STUCCO, ACCENT, GREEN (DOES NOT APPLY PER
PLANNING COMMISSION): SHERWIN WILLIAMS SW 9183 DARK
COVE, FLAT
9.05 PAINTED STUCCO, ACCENT TRIM, BROWN: SHERWIN WILLIAMS SW 6173, FLAT
9.06 MEDALLION: CORAFORM, CALIFORNIA 257 TRIM, CUT AND MITRE TO FORM 36" x 36" SQUARE, PAINTED COLOR 9.05
9.07 QUATREFOIL: CORAFORM, QUATREFOIL, 22" x 22", PAINTED COLOR 9.05
10.04 BUILDING SIGNAGE, BRONZE
10.06 BUILDING ADDRESS SIGNAGE, BRONZE
10.07 KNOX-VAULT SERIES 4400 KEY BOX, VERIFY FINAL LOCATION WITH FIRE DEPT. RECESS MOUNT AT 5'-0" ABOVE STANDING
SURFACE. PREMISES KEYS FOR ALL BUILDING AREAS (GRAND
MASTER SYSTEM KEYS) LABELED WITH APPROVED KEY TAGS
IDENTIFYING EACH DOOR OR AREA SERVED
23.03 PTAC GRILLE PER MECHANICAL, PAINT TO MATCH SURROUNDING
BUILDING COLOR
26.10 BRACKET LIGHT, SEE ELECTRICAL
No. Description Date
1 Plan Check 1,
c
oordination
7/8/24
05/26/2026
C11
Level 1
0"
Level 2
15' - 6"
Roof
25' - 6"
C E FBA
9' - 0"9' - 0"
6.01 6.01
23.027.01
6.01 6.02
6.05 6.06
9.01 9.01
6.03 6.06
6.05 -
---
9 A3
Level 1
0"
Level 2
15' - 6"
Roof
25' - 6"
DB'A'
6.01 6.01 6.05
6.056.05
6.06 6.05
23.02 6.02
9' - 0"
9' - 0"
6.05 3.02
-
---
9 A3
Level 1
0"
Level 2
15' - 6"
Roof
25' - 6"
3 4 2 1
7.01 6.01
6.01 23.02
7.01 6.01
6.05 6.05
6.05 6.05
3.02 6.02 6.06
6.05 6.05
6.05 6.06
9.01 9.01
-
---
9 A3
Scale
Set Date
Drawn By
Project Number
ALL DRAWINGS AND WRITTEN MATERIAL
APPEARING HEREIN CONSTITUTE ORIGINAL
AND UNPUBLISHED WORK OF THE
ARCHITECT AND MAY NOT BE DUPLICATED,
USED OR DISCLOSED WITHOUT WRITTEN
CONSENT OF ARCHITECT
SHEET NO.
1/8" = 1'-0"10/6/2025 11:06:04 AM
AB5.2
Building B Sections
Hotel Investment Group
Sante Fe Place Multi-Family
Author
Oct. 6, 2025
992958 Postal Way, Vista CA
1650 Hotel Circle North, Suite 200, San Diego, CA 92108 1/8" = 1'-0"AB5.2
2 Section 2
1/8" = 1'-0"AB5.2
1 Section 1
1/8" = 1'-0"AB5.2
3 Section 3
Keynotes
3.02 (E) CONCRETE SLAB
6.01 (E) ROOF FRAMING
6.02 (E) FLOOR FRAMING I-JOISTS 16" O.C.
6.03 (E) 18" GLULAM FLOOR BEAM
6.05 (E) 2x STUD WALL FRAMING
6.06 (E) DECK FRAMING
7.01 (E) ROOF TILE
9.01 5/8" TYPE 'X' GYPSUM BOARD
23.02 GOOSENECK VENT, TYPICAL, SEE MECHANICAL
No. Description Date
05/26/2026
C11
WD
W
H
SC
SC
SC
SC
SC
SCSC
SC
56 D
B'
AB6.1
9 AB6.1
AB6.15
30' - 0"
8' - 9"6' - 3"
AB6.18
21' - 2"12' - 2"
33' - 4"
24' - 1"9' - 3"
15' - 0"15' - 0"
8' - 8" 2' - 11" 9' - 7"
Unit B4
117
Unit B5
118
U1
U3U2
U1
B6
12' - 7"11' - 6"
15"
28"
MIN. CLR.
ø 5' - 0"
L3 L3
L2 L1
G D
G
Pt
J
48"
30"
30"x48" CLEAR
SPACE CENTERED
ON EQUIPMENT
LIVING
BEDROOM
BATH
Laundry
6 BEDROOM
LIVING
BATH
23.0123.01
6 23.04
23.04 AB6.110
9.09 9.09
26.08 U3
U2
26.08 22.01
1 10.09
3 10.09
3 56
D
B'
2' - 4"
EQEQEQ
3' - 0"
2' - 0"
28.01 1
EQEQ
EQEQ
EQ EQ
EQEQ
GB
9' - 0"
GB
9' - 0"
GB
9' - 0"
GB
9' - 0"
EQEQ
GB
8' - 0" GB
9' - 0"
GB
8' - 0"
9.08 9.08
2' - 4"
EQ EQ EQ
8.04 8.04
8.068.06
EQEQ
2 2
56 D
B'
15' - 0"15' - 0"
AB6.1 7
33' - 4"
21' - 5"11' - 11"
12' - 7"8' - 10"
Unit B7
217
Unit B7
218
U1U1
U2 U2
U3U3
F F
D D
LIVING
BEDROOM
BATH
LIVING
BATH
BEDROOM
23.0123.01
23.0423.04
9.099.09
26.08 8' - 9"6' - 3"6' - 3"8' - 9"
10.09 3
56 D
B'
EQEQEQ
2' - 0"
EQ EQ
EQEQ
EQEQ
EQEQ
GB
9' - 0"
GB
9' - 0"
9.089.08
2' - 4" 2' - 4"
EQEQEQ
EQ EQ
EQEQ
2' - 0"
EQ EQ
EQ EQ GB
9' - 0"
8.04 8.04
EQEQ
GB
9' - 0"
GB
9' - 0"
GB
9' - 0"
30" 18" 36"
31" 15" 33" 15" 28" 15"
15" 33" 15"
VERIFY
31" 12"
18" 66"
36"18"30"
12" 36"
11.01 11.03
11.05 30" 18" 36"
12"31"15"33"12"31"
18" 66"
12"
VERIFY
31"15"33"12"
36"18"30"
12" 36"
11.01 11.03
11.05 MIN.
15"
48" MAX.1
L1 L2
L3 L3
30" 18" 36"
12" 30" 12" 31" 12"
18" 66"
30" 18" 36"
31" 12" 30" 12" 31" 12"
12" 36"
11.01 11.03
11.05 40" 2" 4" 34"
6' - 8"
6.10 19"
40" 2" 4" 34"
6' - 8"
6.10 19"
Scale
Set Date
Drawn By
Project Number
ALL DRAWINGS AND WRITTEN MATERIAL
APPEARING HEREIN CONSTITUTE ORIGINAL
AND UNPUBLISHED WORK OF THE
ARCHITECT AND MAY NOT BE DUPLICATED,
USED OR DISCLOSED WITHOUT WRITTEN
CONSENT OF ARCHITECT
SHEET NO.
As indicated10/6/2025 11:06:10 AM
AB6.1
Building B Unit Plans
West
Hotel Investment Group
Sante Fe Place Multi-Family
Author
Oct. 6, 2025
992958 Postal Way, Vista CA
1650 Hotel Circle North, Suite 200, San Diego, CA 92108 1/4" = 1'-0"AB6.1
1 Level 1 Plan West
1/4" = 1'-0"AB6.1
2 Level 1 Ceiling West
1/4" = 1'-0"AB6.1
3 Level 2 Plan West
1/4" = 1'-0"AB6.1
4 Level 2 Ceiling West
3/8" = 1'-0"AB6.1
5 B4 Kitchen Elevation
3/8" = 1'-0"AB6.1
7 B7 Kitchen Elevation
3/8" = 1'-0"AB6.1
9 Laundry Elevation B
Keynotes
6.10 PREFABRICATED WATER-RESISTANT TUB/SHOWER
SURROUND, MIN. 72" ABOVE DRAIN INLET
8.04 PROVIDE CEILING ACCESS DOOR IN EACH UNIT AT
WATER SHUTOFF VALVES, VERIFY SIZE AND LOCATION
BEFORE INSTALLATION
8.06 CEILING ACCESS PANEL WITH KEYED LOCK, 22"x30",
BEST ACCESS DOORS 'BA-AHD' OR EQUIVALENT.
PROVIDE 30" SQUARE 1/2" PLYWOOD ADJACENT TO
OPENING
9.08 5/8" TYPE 'X' MOISTURE RESISTANT GYPSUM BOARD
9.09 5/8" TYPE 'X' MOISTURE RESISTANT GYPSUM BOARD
BEHIND TUB/SHOWER SURROUND
10.09 FIRE EXTINGUISHER CABINET, RECESSED; 48" MAX. TO
HIGHEST OPERABLE PART
11.01 REFRIGERATOR
11.03 ELECTRIC RANGE OVEN
11.05 WALL MOUNTED MICROWAVE WITH RANGE HOOD
EXHAUST
22.01 WATER HEATER PER PLUMBING
23.01 PTAC PER MECHANICAL. PAINT PTAC GRILLE TO MATCH
SURROUNDING BUILDING COLOR
23.04 FRAME OPENING FOR FUTURE 26" PTAC. PROVIDE
POWER AND CONDENSATE IN SAME MANNER AS
INSTALLED PTACs
26.08 ELECTRICAL SUB-PANEL, SEE ELECTRICAL
28.01 COMBINATION CARBON MONOXIDE SMOKE DETECTOR,
SEE ELECTRICAL
Laundry Equipment Schedule
Type
M
ark Description Manufacturer Model Comments
L1 Front Load Washer Encore Pro DLHF0315GC2 6" Pedestal L
2 Front Load Dryer Encore Pro WHLFP715GC2 6" Pedestal
L3 Stacked Washer Dryer Encore Pro WDLHS0315GC2
3/8" = 1'-0"AB6.1
6 B5 Kitchen Elevation
3/8" = 1'-0"AB6.1
8 B4 Bath Elevation
3/8" = 1'-0"AB6.1
10 Unit 5 Bath Elevation 2
3/5/25
No. Description Date
1 Plan Check 1,
c
oordination
7/8/24
2 Coordination 3/12/25
3 Fire Dept, SDG&E,
Owner, Coord.
7/30/25
3 05/26/2026
C11
WH
SC
SC
SC
SC
SC
SCSC
SC
C
34 2
E
B
AB6.2 2
AB6.2
6 AB6.2 4
20' - 0" 20' - 0"
22' - 6" 22' - 6"
AB6.28
AB6.2 3
20' - 0" 20' - 0"
10' - 9" 9' - 3"
2' - 0"
8' - 3"2' - 0"5' - 4"
Unit B1
113
Unit B2
114
Unit B3
115
Unit B1
116
AB6.2
7 U1U1
U3
U1U1
U3
15' - 7" 6' - 11" 12' - 0" 10' - 6"
13' - 1" 6' - 11" 6' - 7" 2' - 6" 10' - 11"
5' - 3"6' - 9"
U2
U3
9' - 0"
9' - 8"
10' - 11" 2' - 6" 6' - 7" 8' - 9" 11' - 3"
10' - 6" 12' - 0" 11' - 10" 10' - 8"
5' - 3" 6' - 9"
U3
U2
U2
8' - 0"
8' - 0"
E
H H
K
H
D D
M
LIVING
BATH
BEDROOM
LIVING
BEDROOM
CLOSET
BATH
BATH
BEDROOM
LIVING
BATHBEDROOM
LIVING
23.0123.01
23.0123.01
23.04 23.04
23.04 23.04
9.09 9.09
9.09 9.09
26.08 26.08
26.08 26.08
U4
2 22.01
U2
2 2/18/25
10.09 3
18" 66"
30" 18" 36"
30" 18"
12" 36"
30" 18" 36"
31" 12" 33" 15" 31"
12" 33" 15"
VERIFY
31"
11.01 11.03
11.05 26.08
31" 12" 33" 15" 31" 12"
12" 33" 15"
VERIFY
31" 12"
30" 18" 36"
12" 36"
18" 66"
30" 18" 36"
11.01 11.03
11.05 27"30"15"54"8"
66"18"
36"18"30"
31" 31" 15" 30" 27"
11.01 11.03
11.05 C
34 2 1
E
B
5' - 0"
4' - 1"
2' - 4"
1' - 10"
EQ EQ
EQ EQ
EQEQEQ
EQ EQ
5' - 7"
1' - 10"
3' - 9"3' - 9"
EQ EQ
28.01 1
EQ EQ
EQ EQ
EQ EQ
2' - 4"
EQ EQ
EQ EQ
GB
9' - 0"
GB
9' - 0"
GB
8' - 0"
GB
9' - 0"
GB
9' - 0"
GB
8' - 0"
GB
7' - 1"
GB
9' - 0"
GB
8' - 0"
9.08 9.08
9.08 GB
9' - 0"
GB
8' - 0"
9.08 2' - 4"
3' - 9"3' - 9"
EQ EQ
EQ EQ
EQ EQ
4' - 0" 4' - 0"
3' - 0"
8.04 8.04
8.04 8.04
8.068.06
8.068.06
EQEQ
EQEQ
2 2
2 2
2 3/5/25
GB
9' - 0" GB
9' - 0"
40" 2" 4" 34"
6.10 6' - 8"
36"
19"
34"4"2"40"
6.10 6' - 8"
36"
19"
40" 2" 4" 34"
6.10 36"
19"
Scale
Set Date
Drawn By
Project Number
ALL DRAWINGS AND WRITTEN MATERIAL
APPEARING HEREIN CONSTITUTE ORIGINAL
AND UNPUBLISHED WORK OF THE
ARCHITECT AND MAY NOT BE DUPLICATED,
USED OR DISCLOSED WITHOUT WRITTEN
CONSENT OF ARCHITECT
SHEET NO.
As indicated10/6/2025 11:06:15 AM
AB6.2
Building B Unit Plans
East
Hotel Investment Group
Sante Fe Place Multi-Family
Author
Oct. 6, 2025
992958 Postal Way, Vista CA
1650 Hotel Circle North, Suite 200, San Diego, CA 92108 1/4" = 1'-0"AB6.2
1 Level 1 Plan East
3/8" = 1'-0"AB6.2
2 B1 Kitchen Elevation
3/8" = 1'-0"AB6.2
4 B2 Kitchen Elevation
3/8" = 1'-0"AB6.2
6 B3 Kitchen Elevation
1/4" = 1'-0"AB6.2
5 Level 1 Ceiling East
Keynotes
6.10 PREFABRICATED WATER-RESISTANT TUB/SHOWER
SURROUND, MIN. 72" ABOVE DRAIN INLET
8.04 PROVIDE CEILING ACCESS DOOR IN EACH UNIT AT
WATER SHUTOFF VALVES, VERIFY SIZE AND LOCATION
BEFORE INSTALLATION
8.06 CEILING ACCESS PANEL WITH KEYED LOCK, 22"x30",
BEST ACCESS DOORS 'BA-AHD' OR EQUIVALENT.
PROVIDE 30" SQUARE 1/2" PLYWOOD ADJACENT TO
OPENING
9.08 5/8" TYPE 'X' MOISTURE RESISTANT GYPSUM BOARD
9.09 5/8" TYPE 'X' MOISTURE RESISTANT GYPSUM BOARD
BEHIND TUB/SHOWER SURROUND
10.09 FIRE EXTINGUISHER CABINET, RECESSED; 48" MAX. TO
HIGHEST OPERABLE PART
11.01 REFRIGERATOR
11.03 ELECTRIC RANGE OVEN
11.05 WALL MOUNTED MICROWAVE WITH RANGE HOOD
EXHAUST
22.01 WATER HEATER PER PLUMBING
23.01 PTAC PER MECHANICAL. PAINT PTAC GRILLE TO MATCH
SURROUNDING BUILDING COLOR
23.04 FRAME OPENING FOR FUTURE 26" PTAC. PROVIDE
POWER AND CONDENSATE IN SAME MANNER AS
INSTALLED PTACs
26.08 ELECTRICAL SUB-PANEL, SEE ELECTRICAL
28.01 COMBINATION CARBON MONOXIDE SMOKE DETECTOR,
SEE ELECTRICAL
3/8" = 1'-0"AB6.2
3 B3 Bath Elevation
3/8" = 1'-0"AB6.2
7 B1 Bath Elevation
3/8" = 1'-0"AB6.2
8 B2 Bath Elevation
2 3/5/25
No. Description Date
1 Plan Check 1,
c
oordination
7/8/24
2 Coordination 3/12/25
3 Fire Dept, SDG&E,
Owner, Coord.
7/30/25
3 05/26/2026
C11
SC
SC
SC
SC
SC
SC
SC
SC
C
34 2
E
B
AB6.33
22' - 6" 22' - 6"
20' - 0" 20' - 0"
12' - 3" 10' - 3" 12' - 0" 10' - 6"
12' - 3" 10' - 3" 12' - 0" 10' - 6"
20' - 0" 20' - 0"
10' - 11" 9' - 1" 9' - 1" 10' - 11"
6' - 2" 2' - 11" 2' - 11" 6' - 2"
13' - 5" 4' - 0" 2' - 7" 2' - 7" 4' - 0" 13' - 5"
13' - 5" 4' - 0" 2' - 7" 2' - 7" 4' - 0" 13' - 5"
5' - 3"6' - 9"7' - 0" 5' - 3"
6' - 9" 5' - 3"7' - 0" 5' - 3"
4' - 0" 11' - 6" 4' - 0" 11' - 9"
Unit B1
213
Unit B1
214
Unit B6
215
Unit B6
216
U1U1
U1 U1
U3
U2
U3
U2
U2
U3
U2
U3
9' - 2"9' - 2"
K Q Q K
Nt
K
EE
F
L
LIVING
BEDROOM
BATH
LIVING
BATH
BEDROOM
LIVING LIVING
BEDROOMBEDROOM BATH
BATH
23.0123.01
23.01 23.01
23.04 23.04
23.04 AB6.3
4 9.09
9.09 26.08
26.08 K
10.09 10.09
3 3
31" 12" 33" 15" 31" 13"
18" 66"
12" 33" 15"
VERIFY
31" 13"
30" 18" 36"
30" 18" 36"
12" 36"
11.01 11.03
11.05 C
34 2
E
B
2' - 0"
EQEQ
1' - 10"
1' - 10"
EQEQEQ
2' - 4"
EQEQ
5' - 2"
EQ EQ
2' - 0"
EQEQEQ
2' - 4"
28.01 1
EQ EQ
EQ EQ
GB
9' - 0"
GB
9' - 0"
GB
9' - 0"
GB
9' - 0"
GB
9' - 0"
GB
9' - 0"
9.08 9.08
2' - 0"
EQ EQ
EQEQ
EQEQGB
9' - 0"
9.08 GB
9' - 0"
GB
9' - 0"
EQEQGB
9' - 0"
9.08 2' - 4"
EQ EQ EQ
1' - 10"
1' - 10"
2' - 0" GB
9' - 0"
GB
9' - 0"
8.048.04
8.048.04
EQ EQ
6.10 40" 2" 4" 34"
6' - 8"
19"
Scale
Set Date
Drawn By
Project Number
ALL DRAWINGS AND WRITTEN MATERIAL
APPEARING HEREIN CONSTITUTE ORIGINAL
AND UNPUBLISHED WORK OF THE
ARCHITECT AND MAY NOT BE DUPLICATED,
USED OR DISCLOSED WITHOUT WRITTEN
CONSENT OF ARCHITECT
SHEET NO.
As indicated10/6/2025 11:06:18 AM
AB6.3
Building B Unit Plans
East
Hotel Investment Group
Sante Fe Place Multi-Family
Author
Oct. 6, 2025
992958 Postal Way, Vista CA
1650 Hotel Circle North, Suite 200, San Diego, CA 92108 1/4" = 1'-0"AB6.3
1 Level 2 Plan East
3/8" = 1'-0"AB6.3
3 B6 Kitchen Elevation
1/4" = 1'-0"AB6.3
2 Level 2 Ceiling East
Keynotes
6.10 PREFABRICATED WATER-RESISTANT TUB/SHOWER
SURROUND, MIN. 72" ABOVE DRAIN INLET
8.04 PROVIDE CEILING ACCESS DOOR IN EACH UNIT AT
WATER SHUTOFF VALVES, VERIFY SIZE AND LOCATION
BEFORE INSTALLATION
9.08 5/8" TYPE 'X' MOISTURE RESISTANT GYPSUM BOARD
9.09 5/8" TYPE 'X' MOISTURE RESISTANT GYPSUM BOARD
BEHIND TUB/SHOWER SURROUND
10.09 FIRE EXTINGUISHER CABINET, RECESSED; 48" MAX. TO
HIGHEST OPERABLE PART
11.01 REFRIGERATOR
11.03 ELECTRIC RANGE OVEN
11.05 WALL MOUNTED MICROWAVE WITH RANGE HOOD
EXHAUST
23.01 PTAC PER MECHANICAL. PAINT PTAC GRILLE TO MATCH
SURROUNDING BUILDING COLOR
23.04 FRAME OPENING FOR FUTURE 26" PTAC. PROVIDE
POWER AND CONDENSATE IN SAME MANNER AS
INSTALLED PTACs
26.08 ELECTRICAL SUB-PANEL, SEE ELECTRICAL
28.01 COMBINATION CARBON MONOXIDE SMOKE DETECTOR,
SEE ELECTRICAL
3/8" = 1'-0"AB6.3
4 B6 Bath Elevation
No. Description Date
1 Plan Check 1,
c
oordination
7/8/24
3 Fire Dept, SDG&E,
Owner, Coord.
7/30/25
3 05/26/2026
C11
WH
C C
3 3
4 4
2 2
5 6
6 7
7 1
1 E
F
B
A
D
B'
A'
2 AB5.2
1 AB5.2
3 AB5.2
5.04 C
34 2
5 6
7 1
E
F
B
A
D
B'
A'
2 AB5.2
1 AB5.2
3 AB5.2
5.04 Scale
Set Date
Drawn By
Project Number
ALL DRAWINGS AND WRITTEN MATERIAL
APPEARING HEREIN CONSTITUTE ORIGINAL
AND UNPUBLISHED WORK OF THE
ARCHITECT AND MAY NOT BE DUPLICATED,
USED OR DISCLOSED WITHOUT WRITTEN
CONSENT OF ARCHITECT
SHEET NO.
1/8" = 1'-0"10/6/2025 11:06:20 AM
ABD1
Building B Demolition
Plans
Hotel Investment Group
Sante Fe Place Multi-Family
Author
Oct. 6, 2025
992958 Postal Way, Vista CA
1650 Hotel Circle North, Suite 200, San Diego, CA 92108 1/8" = 1'-0"ABD1
1 Level 1 Demo
1/8" = 1'-0"ABD1
2 Level 2 Demo
Keynotes
5.04 (E) STEEL PIPE COLUMN, PROTECT IN PLACE
No. Description Date
05/26/2026
C11