ACTION:
____________________________
Clerk/Secretary
Department: Engineering Item No: C11
Prepared by:
Erin Adams, Administrative Programs Manager
Daniel Carns, Capital Projects Manager Meeting Date: August 11, 2026 Approved by:
Greg Mayer, Department Director
John Conley, City Manager Agenda Location: Consent Calendar SUBJECT: CIP 8402B – NORTH INDIANA AVENUE SIDEWALK PROJECT – AWARD OF CONTRACT RECOMMENDATION: Adopt City Council Resolution No. 2026- , awarding a contract to RAC Construction & Engineering, Inc. for the North Indiana Avenue Sidewalk Project (CIP No. 8402B) CORRELATION TO CITY COUNCIL GOALS: Traffic: Continue to enhance mobility safety, improve the flow of traffic for all forms of travel, reduce congestion, and improve our roads and sidewalks.
PRIOR ACTION: On June 6, 2026, adopted City Council Resolution No. 2026-98, adopting a Capital Project Budget for Fiscal Years 2026/27 and 2027/28 (Vote: 5-0).
STATEMENT ON THE SUBJECT: The North Indiana Avenue Sidewalk Project (CIP) No. 8402B involves the construction of new sidewalk, curb and gutter along North Indiana Avenue, between The Circle and East Washington Street. The project is located within an existing developed neighborhood roadway where pedestrians currently lack a continuous sidewalk path of travel. The proposed improvements will enhance pedestrian and ADA safety by closing gaps in the existing sidewalk network and installing ADA-compliant curb ramps and crossings.
Staff advertised the project for competitive bids on the City’s procurement website and online procurement portal, OpenGov. On June 25, 2026, the following fifteen bids were received:
Bidder’s Name Office Location Total Bid Amount
Sael Construction Corporation San Diego, CA $164,655.00 RAC Construction & Engineering, Inc. San Diego, CA $176,999.00 Miramar General Engineering National City, CA $177,764.00 A. B. Hashimi, Inc. San Diego, CA $180,011.00
LC Paving & Sealing, Inc. Escondido, CA $184,072.00
Pavement Rehab Company Yorba Linda, CA $188,000.00
HSCC, Inc. El Cajon, CA $197,400.00
RGC General Engineering Inc. Chula Vista, CA $203,672.00 In The Dirt Engineering Ramona, CA $221,229.50
YBS Construction Engineering San Diego, CA $222,342.75
De La Fuente Construction, Inc. San Diego, CA $230,808.44 Van Engineering, Inc. Wildomar, CA $240,016.00
Fordyce Construction, Inc. Santee, CA $246,958.00
AGENDA
REPORT
CITY COUNCIL
COMMUNITY DEVELOPMENT COMMISSION
SUCCESSOR AGENCY
BUENA SANITATION DISTRICT
JOINT POWERS FINANCING AUTHORITY
Approved above recommendation, adopted City Council Resolution No. 2026-128. Vote: 5-0
ACTION:
____________________________
Clerk/Secretary
Department: Engineering Item No: C11
Prepared by:
Erin Adams, Administrative Programs Manager
Daniel Carns, Capital Projects Manager Meeting Date: August 11, 2026 Approved by:
Greg Mayer, Department Director
John Conley, City Manager Agenda Location: Consent Calendar SUBJECT: CIP 8402B – NORTH INDIANA AVENUE SIDEWALK PROJECT – AWARD OF CONTRACT RECOMMENDATION: Adopt City Council Resolution No. 2026- , awarding a contract to RAC Construction & Engineering, Inc. for the North Indiana Avenue Sidewalk Project (CIP No. 8402B) CORRELATION TO CITY COUNCIL GOALS: Traffic: Continue to enhance mobility safety, improve the flow of traffic for all forms of travel, reduce congestion, and improve our roads and sidewalks.
PRIOR ACTION: On June 6, 2026, adopted City Council Resolution No. 2026-98, adopting a Capital Project Budget for Fiscal Years 2026/27 and 2027/28 (Vote: 5-0).
STATEMENT ON THE SUBJECT: The North Indiana Avenue Sidewalk Project (CIP) No. 8402B involves the construction of new sidewalk, curb and gutter along North Indiana Avenue, between The Circle and East Washington Street. The project is located within an existing developed neighborhood roadway where pedestrians currently lack a continuous sidewalk path of travel. The proposed improvements will enhance pedestrian and ADA safety by closing gaps in the existing sidewalk network and installing ADA-compliant curb ramps and crossings.
Staff advertised the project for competitive bids on the City’s procurement website and online procurement portal, OpenGov. On June 25, 2026, the following fifteen bids were received:
Bidder’s Name Office Location Total Bid Amount
Sael Construction Corporation San Diego, CA $164,655.00 RAC Construction & Engineering, Inc. San Diego, CA $176,999.00 Miramar General Engineering National City, CA $177,764.00 A. B. Hashimi, Inc. San Diego, CA $180,011.00
LC Paving & Sealing, Inc. Escondido, CA $184,072.00
Pavement Rehab Company Yorba Linda, CA $188,000.00
HSCC, Inc. El Cajon, CA $197,400.00
RGC General Engineering Inc. Chula Vista, CA $203,672.00 In The Dirt Engineering Ramona, CA $221,229.50
YBS Construction Engineering San Diego, CA $222,342.75
De La Fuente Construction, Inc. San Diego, CA $230,808.44 Van Engineering, Inc. Wildomar, CA $240,016.00
Fordyce Construction, Inc. Santee, CA $246,958.00
AGENDA
REPORT
CITY COUNCIL
COMMUNITY DEVELOPMENT COMMISSION
SUCCESSOR AGENCY
BUENA SANITATION DISTRICT
JOINT POWERS FINANCING AUTHORITY
08/11/2026 C11 1 of 436
MEETING DATE: August 11, 2026 PAGE 2
SUBJECT: CIP 8402B – NORTH INDIANA AVENUE SIDEWALK PROJECT – AWARD OF CONTRACT Palm Engineering Construction Company, Inc San Diego, CA $263,043.00 Dick Miller, Inc. San Marcos, CA $265,376.00
On June 29,2026, staff received a bid protest from RAC Construction & Engineering, Inc., (attached as Exhibit 2) stating there were material deviations in Sael Construction Corporation’s bid. Engineering staff reviewed the bid protest with the City Attorney’s Office. The City agrees with RAC Construction & Engineering, Inc.’s protest and rejected Sael Construction Corporation’s bid.
Staff reviewed the bid from the next lowest bidder of $176,999 from RAC Construction & Engineering, Inc. and has determined that they are the lowest responsible bidder who responded to all the requirements of the bid request.
Staff recommends that the City Council award the contract for the North Indiana Avenue Sidewalk Project (CIP No. 8402B) to RAC Construction & Engineering, Inc.
FISCAL IMPACT: The construction contract is $176,999, with 10% contingency for a total budget of $194,698.90. Sufficient funding is budgeted and available in the Fiscal Years 2026/27 and 2027/28 Capital Improvement Budgets in CIP No. 8402B, the CDGB Sidewalk Appropriation Account (No. 1036301.578999.8402B).
EXHIBITS:
1.City Council Resolution 2026- , awarding a contract to RAC Construction & Engineering, Inc. for the North Indiana Avenue Sidewalk Project (CIP No. 8402B)
2.Bid Protest from RAC Construction & Engineering, Inc.
3.City Response to Bid Protest
4.Contract with RAC Construction & Engineering, Inc.
08/11/2026 C11 2 of 436
RESOLUTION NO. 2026-
A RESOLUTION OF THE CITY COUNCIL OF THE CHARTERED CITY OF
VISTA, CALIFORNIA, AWARDING A CONTRACT TO RAC CONSTRUCTION & ENGINEERING, INC. FOR THE NORTH INDIANA AVENUE SIDEWALK PROJECT (CIP NO. 8402B)
The City Council of the City of Vista does resolve as follows:
1. Findings. The City Council hereby finds and declares the following:
A. The City solicited bids for the North Indiana Avenue Sidewalk Project (CIP No. 8402B) and on June 25, 2026, public bids for construction were opened an Sael Construction Corporation was the lowest bidder.
B. The City received a bid protest stating there were material deviations in Sael Construction Corporation’s bid.
C. City staff reviewed the bid, agree with the bid protest, and rejected the bid from Sael Construction Corporation.
D. Staff determined the bid from the next lowest bidder submitted by RAC Construction & Engineering, Inc. is responsive in all material aspects to the request for bids, and that the bid from RAC Construction & Engineering, Inc. for the North Indiana Avenue Sidewalk Project has been determined to be the lowest responsive, responsible bid.
2. Action.
A. The contract between the City of Vista and RAC Construction & Engineering, Inc. for the North Indiana Avenue Sidewalk Project is approved, and the Mayor is authorized to execute the contract.
3. Adoption. PASSED AND ADOPTED at a meeting of the City Council of the City of Vista held on August 11, 2026, by the following vote:
AYES:
NOES:
ABSTAIN:
APPROVED AS TO FORM:
WALTER CHUNG, CITY ATTORNEY
By:
APPROVED
Walter C. Chung
20260728103927
JOHN B. FRANKLIN, MAYOR
ATTEST:
KATHY VALDEZ, CITY CLERK
By:
08/11/2026 C11 3 of 436
EXHIBIT 1
California Contractor’s License # A/B – 1073141 5811 Barbarossa Ct., San Diego, CA 92115 | (760) 497-6668 | [email protected] SBA 8(a) DBE #51009 ELBE/SLBE #17RC1818 DGS SBE #2027349 PSWMSDC MBE #AZ17581 CPUC MBE #22000146 DIR #1000855111
June 29, 2026
Project: – North Indiana Avenue Sidewalk Improvements (C.I.P. No. 8402B) Subject: Protest of the Bid Submitted by Sael Construction Corporation Dear City Engineer:
This letter constitutes a formal bid protest submitted by RAC Construction & Engineering, Inc. ("Protestor") concerning the bid submitted by Sael Construction Corporation ("Sael") for the above- referenced project. This protest is filed in accordance with the City's protest procedures. Protestor submited a valid bid on this project and has a direct financial interest in the outcome.
For the reasons set forth below, Protestor respectfully requests that the City find Sael's bid non- responsive and Sael a non-responsible bidder, and that the City reject Sael's bid in its entirety.
I.STATEMENT OF THE BASIS FOR THE PROTEST
Sael's bid package contains numerous material defects, omissions, false statements, and internal inconsistencies that go to the responsiveness of the bid and the responsibility of the bidder. Each deficiency is identified below with reference to the specific portion of the bid documents at issue.
A.The Bid Proposal Is Not Signed (Pages 27–30)
08/11/2026 C11 4 of 436
EXHIBIT 2
California Contractor’s License # A/B – 1073141
5811 Barbarossa Ct., San Diego, CA 92115 | (760) 497-6668 | [email protected] SBA 8(a) DBE #51009 ELBE/SLBE #17RC1818 DGS SBE #2027349 PSWMSDC MBE #AZ17581 CPUC MBE #22000146 DIR #1000855111
The Bid Proposal signature page contains no signature on the "BY" signature line. The bid proposal itself is therefore unexecuted. An unsigned bid proposal is a material defect that renders the bid non- responsive, as the City cannot enforce the bidder's offer.
B. No Corporate Seal Affixed (Page 30)
The space designated for the corporate seal is blank. No corporate seal was affixed to the bid proposal as called for on the form.
C. No Surety Listed / Misidentified Surety (Page 30)
The "Surety or Sureties" field does not identify a surety — it contains only the word "Bond." In addition, the insurance company is listed as "Western Surety Company." The bidder failed to properly name its surety in the space provided as required.
D. Contractor's Licensing Statement Left Blank / Wrong Entity Type (Page 38)
Sael's W-9 identifies the company as an S-Corporation, yet the corporation section of the Contractor's Licensing Statement was left entirely blank. Instead, the bidder completed the statement as an Individual Contractor. The form was not completed in the section appropriate to the bidder's actual legal structure.
E. False, Incomplete, and Defective Project References (Page 39)
08/11/2026 C11 5 of 436
California Contractor’s License # A/B – 1073141
5811 Barbarossa Ct., San Diego, CA 92115 | (760) 497-6668 | [email protected] SBA 8(a) DBE #51009 ELBE/SLBE #17RC1818 DGS SBE #2027349 PSWMSDC MBE #AZ17581 CPUC MBE #22000146 DIR #1000855111
The Project References page directs the bidder to list ALL public-agency contracts within the past five years performed as the General (or Prime) Contractor on projects of similar size and complexity. Sael's references are materially false and/or incomplete:
Reference 1 – City of Vista, Street Rehabilitation Project 2025 ($450,000): This project was awarded to Rove Engineering, Inc., not Sael. Sael was not the prime/general contractor. (See City of Vista Notice of Intent to Award and OpenGov record:
https://procurement.opengov.com/portal/cityofvista/projects/167089/selected-vendor.) The listed completion date — "02/30/2026" — is also an impossible date (February has no 30th day) and is a future date.
Reference 2 – City of La Mesa, Street Resurfacing Project ($80,000): This project was awarded to Pal General Engineering, not Sael. Sael was not the prime/general contractor. (See https://vendors.planetbids.com/portal/15382/bo/bo-detail/87529#bidResults.) Reference 3 – City of San Diego, I-15/Friars Road Interchange Project ($390,000): No records exist of Sael Construction ever working as a prime/general contractor for the City of San Diego. (See https://www.sandiego.gov/cip/reports/constructioncontracts.) The references also fail to provide required contact information (contact person and phone) and fail to provide a description of work.
Misrepresenting prior prime/general contractor experience is a material misstatement bearing directly on both responsiveness and the bidder's responsibility and qualifications.
F. Defective Subcontractor List (Page 40)
The Contractor's List of Subcontractors states "N/A." However, per the California Contractors State License Board (CSLB), Sael Construction carries only a clerical/office workers' compensation classification code (8810 – Clerical Office Employees). This strongly indicates that Sael does not self- perform field construction work and intends to use subcontractors, yet none are listed, in apparent conflict with the Subletting and Subcontracting Fair Practices Act (Public Contract Code Div. 2, Pt. 1, Ch. 4) and the self-performance requirements of the bid documents.
08/11/2026 C11 6 of 436
California Contractor’s License # A/B – 1073141
5811 Barbarossa Ct., San Diego, CA 92115 | (760) 497-6668 | [email protected] SBA 8(a) DBE #51009 ELBE/SLBE #17RC1818 DGS SBE #2027349 PSWMSDC MBE #AZ17581 CPUC MBE #22000146 DIR #1000855111
G. Inconsistent and Defective Bid Amount; Placeholder Text (Page 42)
The Contractor's Certification on Federal Contract Requirements shows a conflicting bid amount — "165,655" and "$164,655." The two figures do not agree.
H. EEO Certification – Unsupported Claims (Page 47)
On the Equal Employment Opportunity Certification, Sael answered "YES" to having participated in a prior contract subject to the equal opportunity clause and identified the City of El Cajon, but no contract was provided in either location where the most recent contract was to be identified.
I. Bid Bond Not Signed or Notarized by the Principal (Pages 53–54)
The Bid Bond was not signed by the Principal (Sael). The "Principal" signature block, name, and title are blank, and there is no corporate seal for the Principal. The bond form expressly requires: "This bond must be dated, all signatures must be notarized, and evidence of the authority of any person signing as attorney-in-fact must be attached." The bond bears only the Surety's attorney-in-fact signature (Caleb Cathey) and notarization; the Principal failed to execute and notarize the bond as required. A defective bid security renders the bid non-responsive.
J. Bidder Responsibility – Pending CSLB Citation (CSLB Records)
CSLB records reflect a pending citation against Sael Construction Corporation (Citation No. 2 2024 001823, dated 01/24/2025, Status: PENDING). This pending disciplinary matter is relevant to the City's determination of Sael's responsibility as a bidder.
08/11/2026 C11 7 of 436
California Contractor’s License # A/B – 1073141
5811 Barbarossa Ct., San Diego, CA 92115 | (760) 497-6668 | [email protected] SBA 8(a) DBE #51009 ELBE/SLBE #17RC1818 DGS SBE #2027349 PSWMSDC MBE #AZ17581 CPUC MBE #22000146 DIR #1000855111
II. SPECIFIC PORTIONS OF THE DOCUMENTS FORMING THE BASIS OF THE PROTEST
Bid Proposal and signature page (pp. 27–30) – unsigned bid; no corporate seal; no surety listed; misspelled surety.
Contractor's Licensing Statement (p. 38) – corporation section blank; Project References (p. 39) – false/incomplete prime-contractor references; impossible completion date; missing contact and work-description information.
Contractor's List of Subcontractors (p. 40) – "N/A" inconsistent with CSLB classification (8810).
Contractor's Certification on Federal Contract Requirements (p. 42) – conflicting bid amounts; placeholder text.
Equal Employment Opportunity Certification (p. 47) – unsupported prior-contract claims.
Bid Bond and notarial certificate (pp. 53–54) – Principal failed to sign/notarize.
CSLB License Detail (Workers' Comp classification 8810) and Complaint Disclosure (pending citation).
III. RELIEF REQUESTED
Based on the foregoing material defects, misrepresentations, and inconsistencies, Protestor respectfully requests that the City:
Find Sael Construction Corporation's bid non-responsive; Find Sael Construction Corporation a non-responsible bidder; and Reject Sael's bid and award the contract to the lowest responsive and responsible bidder.
IV. CONTACT INFORMATION FOR THE PROTESTING PARTY
Ruben Claudio
08/11/2026 C11 8 of 436
California Contractor’s License # A/B – 1073141
5811 Barbarossa Ct., San Diego, CA 92115 | (760) 497-6668 | [email protected] SBA 8(a) DBE #51009 ELBE/SLBE #17RC1818 DGS SBE #2027349 PSWMSDC MBE #AZ17581 CPUC MBE #22000146 DIR #1000855111
CEO
RAC Construction & Engineering, Inc
5811 Barbarossa Ct San Diego CA 92115
760-497-6668
[email protected]
In accordance with the City's protest procedures, Protestor is concurrently transmitting a copy of this protest and all attachments to all other parties with a direct financial interest who may be adversely affected by the outcome, including all bidders with a reasonable prospect of award.
Thank you for your consideration of this protest. Please contact the undersigned with any questions or to request additional supporting documentation.
Respectfully submitted,
Do not hesitate to call me with any questions.
Sincerely,
Ruben Claudio
Owner/President
08/11/2026 C11 9 of 436
27 BID PROPOSAL
From: ______________________________________________________________, Bidder, For: The construction of
STREET IMPROVEMENTS
as specifically set forth in documents entitled
NORTH INDIANA AVENUE SIDEWALK IMPROVEMENTS (C.I.P. No. 8402B) The undersigned hereby proposes and agrees that if his bid as submitted in the attached BID SCHEDULE be accepted, he will contract in the form so approved to perform all work for which a Contract may be awarded him, to furnish any and all plant, labor, services, materials, tools, equipment, supplies, transportation, utilities and all other items and facilities necessary therefore as provided in the Contract Documents, and to do everything required therein for the proposed Project as specifically set forth in said Contract Documents, together with appurtenances thereto, all as set forth on the Drawings and in the Project Specifications and other Contract Documents; and he further proposes and agrees to complete all the Work called for by the Drawings, Project Specifications, and other Contract Documents in strict conformity therewith within the time limits set forth therein; and that he will accept as full payment therefore the prices set forth in the BID SCHEDULE forming a part hereof.
The undersigned hereby submits either a Bid Bond or Bid Security in the form of Cash, a Cashier’s Check,or a Certified Check, using the forms included in these Bid Documents, properly made payable to CITY OF VISTA,hereinafter designated as the Agency,in an amount that is at least ten percent (10%) of the total base bid amount. The Bid Bond or Bid Security is attached hereto and is given as a guaranty that the undersigned will execute the Contract and furnish the required bonds if awarded the Contract and, in case of failure to do so within the time provided, the proceeds of said bond or bid security shall be forfeited to the Agency. The Surety’s liability to the Agency for forfeiture of the face amount of the bond shall be considered as established.
Sael Construction Corporation
08/11/2026 C11 10 of 436
28 It is understood and agreed that:
1. The undersigned has carefully examined all Bid documents and other Documents which will form the Contract, including all addenda as prepared prior to the date of bid opening setting forth any modifications or interpretations of any said documents.
2. The undersigned has, by investigating the site of work, by reviewing and analyzing the Plans and Specifications, and by otherwise familiarizing himself with the Project, has satisfied himself as to the nature and location of the Work and has fully informed himself as to all conditions and matters which can in any way affect the Work or the cost thereof.
3. The undersigned fully understands the scope of the Work and has included in the various related items of Work the cost of all work not listed as a separate item so that the Bid for the Project reflects the total cost for completing the Work in its entirety, has checked carefully all words and figures inserted in this Bid, and he further agrees that the Agency shall in no way be responsible for any errors or omissions in the preparation of this proposal.
4. The undersigned will execute the Contract and furnish the required Performance Bond, Payment Bond, and proof of insurance coverage within the stipulated time after the posting of a notice to him of acceptance of his bid by the Agency; and further, that this bid may not be withdrawn for a period of ninety (90) calendar days after the date set for the opening thereof unless otherwise required by law. If any bidder shall withdraw his bid within said period, the bidder shall be liable under the provisions of the Bid Security, or the bidder and his surety shall be liable under the Bid Bond, as the case may be.
5. The surety or sureties and insurance companies named in the space provided have agreed to furnish bonds, insurance, and endorsements in the form and amounts set forth in the Contract Documents in the event the Contract is awarded on the basis of this proposal.
6. The undersigned hereby certifies that this proposal is genuine and not sham or collusive or made in the interest or in behalf of any person not herein named, and the undersigned has not directly or indirectly induced or solicited any other bidder to put in a sham bid, or any other person, firm or corporation to refrain from bidding,and the undersigned has not in any manner sought by collusion to secure for himself an advantage over any other bidder.
7. In conformance with current statutory requirements of Section 1860, et. seq., of the Labor Code of the State of California, the undersigned confirms the following as his certification:
“I am aware of the provisions of Section 3700 of the Labor Code which require every employer to be insured against liability for workers’ compensation or to undertake self-insurance in accordance with the provisions of that code,and I will comply with such provisions before commencing the performance of the work of this contract.”
8. Receipt of Addenda No. ___ through ___ is hereby acknowledged. (If none, write “NONE”).
1 1
08/11/2026 C11 11 of 436
29 9. The prospective bidder certifies, by INITIALING AFTER THE FOLLOWING STATEMENT and by signing and submitting this bid, to the best of his or her knowledge and belief, that:
No federal appropriated funds have been paid or will be paid, by or on behalf of the undersigned, to any person influencing or attempting to influence an officer or employee of any federal agency, a Member of Congress, an officer or employee of Congress, or an employee of a Member of Congress in connection with the awarding of any federal contract, the making of any federal grant, the making of any federal loan, the entering into of any cooperative agreement, and the extension, continuation, renewal, amendment, or modification of any federal contract, grant, loan, or cooperative agreement.
Initials _______
If any funds other than federal appropriated funds have been paid or will be paid to any person for influencing or attempting to influence an officer or employee of any federal agency, a Member of Congress, an officer or employee of Congress, or an employee of a Member of Congress in connection with this federal contract, grant, loan, or cooperative agreement, the undersigned shall complete and submit Standard Form-LLL, “Disclosure of Lobbying Activities,” in accordance with its instructions. The “Disclosure of Lobby Activities” is form Attachment G on page 12-87 of Exhibit 12-E titled “Federal Requirements for Federal-Aid Construction Project”.
This certification is a material representation of fact upon which reliance was placed when this transaction was made or entered into. Submission of this certification is a prerequisite for making or entering into this transaction imposed by Section 1352, Title 31, U.S. Code. Any person who fails to file the required certifications shall be subject to a civil penalty of not less than $10,000 and not more than $100,000 for each such failure.
The prospective participant also agrees by submitting his or her bid or proposal that he or she shall require that the language of this certification be included in all lower tier subcontracts, which exceed $100,0000 and that all such sub-recipients shall certify and disclose accordingly.
10. In compliance with the Notice Inviting Bids and all the provisions hereinbefore stipulated, the undersigned, with full cognizance thereof, hereby proposes to perform the entire work for the prices set forth in the attached BID SCHEDULE upon which award of the Contract is made. (Continued on next page)
08/11/2026 C11 12 of 436
30 DATE: ________________, 20_____ BIDDER’S NAME___________________________
BY______________________________________
Signature
________________________________________
Printed Name
TITLE____________________________________
BY______________________________________
Signature
________________________________________
Printed Name
TITLE____________________________________
(CORPORATE SEAL) BIDDER'S MAILING ADDRESS:
Name and address of all members ________________________________________ of the firm or names of all officers
of the corporation. ________________________________________
CORPORATION ORGANIZED UNDER THE LAWS
_________________________________ OF THE STATE OF
_________________________________ ________________________________________
_________________________________ CONTRACTOR'S LICENSE # _________________
_________________________________ EXPIRATION DATE_________________________
_________________________________ CONTRACTOR'S LICENSE CLASS______________
_________________________________ SURETY OR SURETIES: _____________________
_________________________________ ________________________________________
_________________________________ INSURANCE COMPANY:
_________________________________ ________________________________________
I certify (or declare) under penalty of perjury under the laws of the State of California that the foregoing is true and correct:
______________ _________________________________
Date CONTRACTOR'S SIGNATURE
June, 24 26 Sael Construction Corporation
Ahmed Hussein
President
Ahmed Hussein
2173 Camino Del Este #6115
San Diego, CA92108 1086338
01/30/2028
A, B
2173 Camino Del Este #6115
San Diego, CA92108
Westren Suerty Company
Bond
06/24/2026
California
NO SURETY LISTED
NO CORP SEAL
NO SIGNITURE ON BID PROPOSAL
08/11/2026 C11 13 of 436
31 BID SCHEDULE
To be completed through the City’s Electronic Bidding System (OpenGov Procurement)
Pursuant to and in compliance with the Notice Inviting Bids and other Contract Documents relating to the proposal for the construction of
STREET IMPROVEMENTS
as specifically set forth in documents entitled
NORTH INDIANA AVENUE SIDEWALK IMPROVEMENTS (C.I.P. No. 8402B)
all in accordance with the Plans and Project Specifications on file at the City of Vista Engineering Department, the undersigned bidder, having familiarized himself with the terms of the Contract, the local conditions affecting the performance of the Contract and the cost of the Work at the place the Work is to be done; and with the Plans, Project Specifications and other Contract Documents, hereby stipulated; the Contractor agrees to complete the Contract, including all of its component parts and everything required to be performed, and to provide and furnish any and all labor, materials, tools, equipment, expendable supplies and all utility and transportation services necessary to perform the Contract, and complete in a workmanlike manner all of the Work required in connection with the Contract, all in strict conformance with the Plans and Project Specifications on file at the City of Vista Engineering Department.
All items shall be finished and functional per Plans and the Contract Documents. Items designated with an ‘S’ in the Bid Item column of the Bid Schedule are Specialty Items per Subsection 3-2 (“SELF-PERFORMACE”) of the San Diego Regional Supplement to the Greenbook.
08/11/2026 C11 14 of 436
32 BID SCHEDULE
(Provided for reference only)
PROJECT NAME: NORTH INDIANA AVENUE SIDEWALK IMPROVEMENTS (C.I.P.No.8402B) TO BE COMPLETED THROUGH THE CITY’S ELECTRONIC OPENGOV PROCUREMENT BIDDING SYSTEM
NOTE 1: The Bid Schedule Worksheet is only provided as a reference for preparing the bid. Only the unit prices and totals entered in the OpenGov Procurement bidding system will be considered valid for purposes of the City’s bid evaluation. The low bidder bid schedule from OpenGov Procurement will be printed and inserted into the final contract documents.
Note 2: Unit prices shall prevail over extended total and grand total prices. Late bids will not be accepted. The following “Description of Base Bid Items” is part of the Bid Schedule and shall be submitted with the bid.
Bid Items
Bid
Item Description Of Work Qty. Unit
GENERAL
1 Mobilization, Demobilization, bonds &
insurance. (5% maximum of Total Base Bid) 1 LS
2 Project Information Sign 2 EA
3 Public Notification per Supplementary General
Provisions, Section 7-12.2 1 LS
4 Storm Water Pollution Prevention and Erosion
Control 1 LS
5 Traffic Control and Construction Staging for all
work 1 LS
6 Utility Potholing and Coordination 1 LS
7 Unforeseen Field Conditions (stipulated amount) $15,000 8 Record Drawing (“As-Built”) Plans (stipulated
amount) $2,000
REMOVAL / RELOCATE / ADJUSTMENT
9 Remove and dispose existing vegetation, roots,
shrubs, landscaping, fences, and any other
existing improvements conflicting with new
improvements.
1 LS
10 Remove Private Property Encroachments at 326
& 332 N Indiana Ave and return encroachments
to property owner
1 LS
11 Tree Removal 4 LS
08/11/2026 C11 15 of 436
33 Bid
Item Description Of Work Qty.Unit
12 Relocate, Reconstruct, Rotate or Replace existing
mailbox and post per City of Vista Standard
Drawing SRF-04 including reflective address
numbers in front and side of mailbox (2”
minimum)
2 EA
13 Relocate existing metal mailbox (includes
construction of new footing) 1 EA
14 Reconfigure Existing Private Irrigation Systems
and Replace Groundcover to Match Existing
Private Landscaping Disturbed by Construction
1 LS
15 Adjust Street Light Utility Box to Finish Grade 1 EA
EARTHWORK
16 Unclassified excavation 1 LS
GENERAL SURFACE IMPROVEMENTS
17 Asphalt concrete pavement for full depth
pavement restoration, 1’ wide slot patch, 6"
depth per SRF-13 58 LF
18 6” Type G’ curb and gutter per SDRSD No. G-2
with 6" of aggregate base 61 LF
19 PCC Cross Gutter and spandrel per SDRSD No. G-
12 on 6" aggregate base (includes curb) 70 SF
20 4" PCC Sidewalk per SDRSD No. G-7 with 6" of
aggregate base 1877 SF
21 PCC Driveway Entrance per SDRSD No. G-14A
with 6" aggregate base 54 SF
22 PCC Alley Driveway Entrance per SDRSD G-14E
on with 6" aggregate base 100 SF
23 PCC curb ramp Type A with grey detectable
warning surface per G-27A on 6” aggregate base 4 EA
24 PCC curb ramp Type D with grey detectable
warning surface per G-31 on 6” aggregate base 1 EA
TRAFFIC IMPROVEMENTS
25 Document existing striping to replace in kind,
remove conflicting markings, install new
striping, crosswalks and pavement markings
per Plan, relocate signs on new posts per TRF-
06 1 LS
BID SCHEDULE WORKSHEET – END
08/11/2026 C11 16 of 436
34 (Provided for reference only)
BID SCHEDULE TO BE COMPLETED THROUGH THE CITY’S ELECTRONIC BIDDING SYSTEM (OPENGOV PROCUREMENT)
NOTE: Determination of the lowest bid shall be based solely on the lowest TOTAL BASE BID FOR IMPROVEMENTS.
Unit prices shall prevail over extended total and grand total prices. Late bids will not be accepted.
Description of Base Bid Items:
(Scan and Include with Bid Package)
Bid Item 1, Mobilization & Demobilization, bonds & insurance. (5% maximum of Total Base Bid): Bid item shall include full compensation for all bonds, insurance, sureties, licenses, permits, facilities, labor, equipment and material necessary to complete all work required in advance of construction operations, and upon the initiation of construction operations, to mobilize all required equipment, materials and personnel on-site, and complete all associated and appurtenant work in accordance with the Standard Specifications, the Supplementary General Provisions, and as directed by the Engineer. The Bid Item shall also include all labor, equipment and material required to clean-up and restore the site, demobilize and remove all equipment, materials, and staging, and complete all work required at the end of construction operations in accordance with the Standard Specifications, the Supplementary General Provisions, and as directed by the Engineer. The lump sum price for this item shall not exceed 5% of the total contract price (5% maximum of Total Bid).
Bid Item 2, Project Information Sign: Bid item shall include full compensation for labor, materials and equipment to fabricate, install and maintain project information sign, placed at the North or South edge of the project, providing project and funding information throughout project duration.
Bid Item 3, Public Notification per Supplementary General Provisions, Section 7-12.2: Bid item shall include all necessary labor, equipment, materials, and all other related costs for preparation, copying, and distribution shall be considered as included in the lump sum price Bid for Public Notification Bid Item 4, Storm Water Pollution Prevention and Erosion Control: Bid item shall include full compensation for submitting the required storm water permit (located in the appendix) including all labor, equipment and materials required to complete all work necessary to install, maintain, repair and replace all temporary construction BMPs to prevent the discharge of any materials into the storm drain system. No additional compensation will be made.
Bid Item 5, Traffic Control and Construction Staging for all work: Bid item shall include full compensation for all labor, equipment and materials required to complete all work required to prepare, submit and obtain approved Traffic Control Plans from the City of Vista Traffic Engineering Department and handle traffic (including flagging costs and person(s) to safely control pedestrian and vehicular traffic for single lane closures, furnish tools, equipment and incidentals, and for doing all work involved in staging constructing, furnishing, placing, removing, storing, maintaining, moving to new locations, replacing and disposing of the components of the traffic control system (including traffic control devices, temporary steel plate bridging, temporary road resurfacing); installation and removal of all required temporary striping and signing associated and appurtenant work as specified in the Standard Specifications, the Supplementary General Provisions, per plans and as directed by the Engineer. No additional compensation will be made.
Bid Item 6, Utility Coordination and Potholing: Bid item shall include full compensation for all labor, equipment, and material required to coordinate with all utilities agencies which “may be affected” or “are affected” by the Work in accordance with the Standard Specifications, the Supplementary General Provisions, and as directed by the Engineer. The location, protection, and restoration of existing utilities and improvements, specifically identified for payment under other bid items shall not be included for payment 08/11/2026 C11 17 of 436
35 within this bid item. All other locations, protection and restoration required to complete the Work shall be incorporated into this bid item.
Bid Item 7, Unforeseen Field Conditions (stipulated amount): Bid item shall include full compensation for all labor, equipment and material required to repair, construct, rehabilitate, remove, dispose, relocate, adjust any necessary and unforeseen site feature, utility infrastructure, surface improvements, or unsuitable soil condition, as directed by the Engineer, according to these specifications. No additional compensation will be made. This Bid Item is not subject to Section 3 Changes In Work, and no payment will be made unless the Engineer provides a written Notice to Proceed, or written approval for this bid item.
Bid Item 8, Record Drawing (“As-Built”) Plans (stipulated amount): Bid item shall include full compensation for all labor, equipment and material required to provide City with accurate “red line” plans showing the exact location of all improvements, existing utilities, that have been modified as part of the Work.
Bid Item 9, Remove and dispose existing vegetation, roots, shrubs, landscaping, fences, and any other existing improvements conflicting with new improvements: Bid item shall include full compensation for all labor, equipment and material required to complete all work necessary to remove and legally dispose all natural and artificial objectionable material within the limits of excavation, as required to complete the Work and additional clearing and grubbing as may be identified within the Contract including but not limited to, landscaping, vegetation, shrubs, tree and shrub trimming, roots, stumps, irrigation, yard drains, AC and PCC driveways, AC and PCC sidewalks, decorative pavers, aggregate base, curbs, gutters, drainage pipes, fences, block walls or other surface features in conflict with the project improvements. No additional compensation will be made.
Bid Item 10, Remove Private Property Encroachments and return encroachments back to property owner: Bid item shall include full compensation for all labor, equipment and material required to complete all work necessary to remove, salvage without damage, store and return all private property encroachments, at 326 & 332 N Indiana Ave, in conflict with the project improvements, in the Public Right of Way back to its respective property owner as required to complete the Work. City sent Notice to Property Owners which ordered the removal of all encroachments by August 1st, 2026. Work under this bid items shall be in accordance with the Contract Drawings, Standard Specifications, the Supplementary General Provisions, the Supplementary Technical Provisions and as directed by the Engineer, any other related work shall be considered as included or included in the costs of other work for this item. No additional compensation will be made.
Bid Item 11, Tree Removal: Bid item shall include full compensation for all labor, equipment and material required to complete all work necessary to remove and legally dispose any tree, stump and root network within the limits of excavation, as required to complete the Work in accordance with the Contract Drawings, Standard Specifications, the Supplementary General Provisions, the Supplementary Technical Provisions and as directed by the Engineer, any other related work shall be considered as included or included in the costs of other work. No additional compensation will be made.
Bid Item 12, 'Relocate, Reconstruct, Rotate or Replace existing mailbox and post per City of Vista Standard Drawing SRF-04 including reflective address numbers in front and side of mailbox (2” minimum): Bid item shall include full compensation for all labor, equipment and material required to complete all work necessary to relocate, reconstruct, rotate or replace existing mailbox and post per City of Vista Standard Drawing SRF- 04 including reflective address numbers in front and side of mailbox (2” minimum), including coordination with property owner, as shown on the plans, in accordance with the Contract Drawings, Standard Specifications, the Supplementary General Provisions, the Supplementary Technical Provisions and as directed by the Engineer, any other related work shall be considered as included or included in the costs of other work. Work associated with notification and any coordination with property owner and/or mail agency is included in the cost of work for this bid item. No additional compensation will be made. 08/11/2026 C11 18 of 436
36 Bid Item 13, Relocate existing metal mailbox (includes construction of new footing): Bid item shall include full compensation for all labor, equipment and material required to complete all work necessary to relocate, remove, rotate and place existing metal mailbox and metal post with new 12”x18”x36” concrete footing, as shown on the plans, in accordance with the Contract Drawings, Standard Specifications, the Supplementary General Provisions, the Supplementary Technical Provisions and as directed by the Engineer, any other related work shall be considered as included or included in the costs of other work. Work associated with notification and any coordination with property owner and/or mail agency is included in the cost of work for this bid item. No additional compensation will be made.
Bid Item 14, Reconfigure Existing Private Irrigation Systems and Replace Groundcover to Match Existing Private Landscaping Disturbed by Construction.: Bid item shall include full compensation for all labor, materials, and equipment required to reconfigure private irrigation affected by the proposed improvements, verify irrigation working order, replace turf/groundcover/sod to match private landscaping as directed by the Engineer, shown on the plans, according to these specifications, plumbing code and any other related work shall be considered as included or included in the costs of other work. No additional compensation will be made.
Bid Item 15, Adjust Street Light Utility Box to Finish Grade: Bid item shall include full compensation for all labor, equipment and material required to adjust existing street light electric pull box covers flush and even with final and temporary finish surfaces per Contract Specifications and any other related work shall be considered as included or included in the costs of other work. No additional compensation will be made.
Bid Item 16, Unclassified excavation: Bid item shall include full compensation for all labor, equipment and material required to complete all work necessary for the roadway, parkway, slope excavation, transitions to existing, grading, compaction, dewatering, export excess material, borrow, subgrade preparation, restoration, and export of excess soil to a legal disposal site as required to complete the Work in accordance with the Standard Specifications, the Supplementary General Provisions, the Supplementary Technical Provisions 300- 2, typical section as shown on the Plans, the Plans and as directed by the Engineer and any other related work shall be considered as included or included in the costs of other work. No additional compensation will be made.
Bid Item 17, Asphalt concrete pavement for full depth pavement restoration, 1’ wide slot patch, 6" depth per SRF-13: Bid item shall include full compensation for all labor, equipment, material, and mobilization for installation of asphalt concrete, i.e. Hot Mix Asphalt (HMA), compacted in place. The Work shall include, but may not necessarily be limited to prime coat, tack coat, distribution, spreading, rolling, compacting, joining, adjusting (resetting) of manholes and other structures, associated and appurtenant work, in accordance with Section 302-5. of the Supplementary General Provisions, the Standard Specifications, the Supplementary Technical Provisions and as directed by the Engineer, called for in the plans and any other related work shall be considered as included or included in the costs of other work. No additional compensation will be made
Bid Item 18, 6” Type ‘G’ curb and gutter per SDRSD No. G-2 with 6” aggregate base: Bid item shall include full compensation for all labor, equipment and material required to construct 6” curb and gutter per SDRSD G-2, on minimum of 6” class 2 base under curb and gutter as directed by the Engineer, shown on the plans, according to these specifications and any other related work shall be considered as included or included in the costs of other work. This bid item includes curb and gutter quantities associated with driveway entrances or driveway wings. No additional compensation will be made.
Bid Item 19, PCC Cross Gutter per SDRSD No. G-12 with 6” aggregate base: Bid item shall include full compensation for all labor, equipment and material required to construct concrete curb, cross gutter and 08/11/2026 C11 19 of 436
37 spandrel per SDRSD G-12, on minimum of 6” class 2 base as directed by the Engineer, shown on the plans, according to these specifications and any other related work shall be considered as included or included in the costs of other work. No additional compensation will be made.
Bid Item 20, 4” PCC sidewalk per SDRSD No. G-07 with 6” aggregate base: Bid item shall include full compensation for all labor, equipment and material required to construct concrete sidewalk per SDRSD G-07, on minimum of 6” class 2 base as directed by the Engineer, shown on the plans, according to these specifications and any other related work shall be considered as included or included in the costs of other work. No additional compensation will be made. This bid item quantity excludes the area of the sidewalk behind all driveway entrances, since that portion is included in the description for the bid item 19 Driveway Entrance.
Bid Item 21, PCC Driveway Entrance per SDRSD No. G-14A per plan with 6" aggregate base: Bid item shall include full compensation for all labor, equipment and material required to dowel new driveway into existing driveway, construct concrete driveway per SDRSD G-14A as modified per plan on 6” compacted aggregate base, as directed by the Engineer, shown on the plans, according to these specifications and any other related work shall be considered as included or included in the costs of other work. No additional compensation will be made
Bid Item 22, PCC Driveway Entrance per SDRSD G-14E with 6" aggregate base: Bid item shall include full compensation for all labor, equipment and material required to dowel new driveway into existing driveway, construct concrete driveway per SDRSD G-14E per plan on 6” compacted aggregate base, as directed by the Engineer, shown on the plans, according to these specifications and any other related work shall be considered as included or included in the costs of other work. No additional compensation will be made
Bid Item 23, PCC curb ramp Type A with grey detectable warning surface per G-27A on 6” aggregate base: Bid item shall include full compensation for all labor, equipment and material required to construct concrete curb ramps with truncated domes (dark grey color), sidewalk, and 6” aggregate base per SDRSD G-29 as directed by the Engineer, shown on the plans, according to these specifications, curb ramp checklist and any other related work shall be considered as included or included in the costs of other work. No additional compensation will be made.
Bid Item 24, PCC curb ramp Type D with grey detectable warning surface per G-31 on 6” aggregate base: Bid item shall include full compensation for all labor, equipment and material required to construct concrete curb ramps with truncated domes (dark grey color), sidewalk, and 6” aggregate base per SDRSD G-31 as directed by the Engineer, shown on the plans, according to these specifications, curb ramp checklist and any other related work shall be considered as included or included in the costs of other work. No additional compensation will be made.
Bid Item 25, Document existing striping to replace in kind, remove conflicting markings, install new striping, crosswalks and pavement markings per Plan, relocate signs on new posts per TRF-06: Bid item shall include full compensation for all labor, equipment and material required to document and remove existing pavement markings (by grinding or sandblasting), install or apply new thermoplastic pavement markings, install or apply painted striping, install or relocate traffic signs on new posts, per Caltrans Standard Details A24A-F, City of Vista Traffic Standards, as directed by the Engineer, shown on the plans, according to these specifications and any other related work shall be considered as included or included in the costs of other work. Prior to construction, contractor shall document all signing and striping that will be affected by construction and replace as needed. No additional compensation will be made.
--END OF BID SCHEDULE--
08/11/2026 C11 20 of 436
38 CONTRACTOR'S LICENSING STATEMENT
The undersigned is licensed in accordance with the laws of the State of California providing for the registration of Contractors.
Contractor's License Number: _________________________________________________________________
Contractor's License Class: _________________________________________________________________
Expiration Date: _________________________________________________________________
(As described in the , complete and sign the
appropriate section for your company)
Name of Individual Contractor (Print or type): ____________________________________________________
Signature of Contractor: _________________________________________________________________
Business Address: _________________________________________________________________
or
Name of Partnership or Joint Venture Firm: ____________________________________________________
Business Address: ________________________________________________________________________
Signature, printed name, title and address of members signing on behalf of the partnership:
Signature: _____________________ Name: ______________________ Title: ______________________
Address: _________________________________________________________________________________
Signature: _____________________ Name: ______________________ Title: ______________________
Address: _________________________________________________________________________________
or
Name of Corporation: ________________________________________________________________________
Business Address: ________________________________________________________________________
Corporation organized under the laws of the State of _____________________________________________
_______________________________________ __________________________________________ Signature of Officer of Corporation Printed Name and Title
_______________________________________ __________________________________________ Signature of Officer of Corporation Printed Name and Title
1086338
A
01/30/2028
Ahmed Hussein
2173 Camino Del Este #6115 San Diego, CA92108
COMPANY IS IDENTIFIED ON IT W-9 AS AN S-CORP AND AREA WAS LEFT BLANK(SEE W-9) 08/11/2026 C11 21 of 436
39 PROJECT REFERENCES
The Bidder shall provide evidence that the Bidder has had the prior experience to properly perform in accordance with the terms of these Plans and Project Specifications.
List contracts with public agencies entered within the past five (5)years of the most recent projects for which the Bidder has completed work of similar size and complexity to this project as the General (or Prime) Contractor, and the names and phone numbers of the contracting public agencies. Make copies of this page for listing additional projects.
Project
No. Date Completed Public Agency Name,
Contact Person & Phone
Project Name and Description of
Work Contract Amount
1. 2.
3. 4.
5. 6.
7. Note: Attached pre-printed list to this page to list additional projects. 02/30/2026 Street Rehabilitation Project 2025 $450,000City of Vist 09/30/2024 City of La Mesa STREET RESURFACING PROJECT $80,000 City of San Diego01/30/2026 I-15/Friars Road Interchange Project $390,000 THIS PROJECT WAS AWARDED TO ROVE ENGINEERING. SAEL WAS NOT THE PRIME/GENERAL AS HIGHLIGHTED IN THE ABOVE INSTRUCTIONS(SEE LINK): https://procurement.opengov.com/portal/cityofvista/projects/167089/selected-vendor THIS PROJECT WAS AWARDED TO PAL GENERAL ENGINEERING. SAEL WAS NOT THE PRIME/GENERAL AS HIGHLIGHTED IN THE ABOVE INSTRUCTIONSSEE LINK: https://vendors.planetbids.com/portal/15382/bo/bo-detail/87529#bidResults NO RECORDS HAVE BEEN LOCATED OF SAEL CONSTRUCTION EVER WORKING IN THE CAPACITY OF A PRIME/GENERAL FOR THE CITY OF SAN DIEGOLINK: https://www.sandiego.gov/cip/reports/constructioncontracts
NO CONTACT INFORMATION PROVIDED NO DESCIPTION OF WORK PROVIDED 08/11/2026 C11 22 of 436
40 CONTRACTOR’S LIST OF SUBCONTRACTORS
PROJECT NAME: NORTH INDIANA AVENUE SIDEWALK IMPROVEMENTS (C.I.P.No.8402B)
NAME OF BIDDER: ______________________________________________________________________________
In accordance with Division 2, Part 1, Chapter 4 of the Public Contract Code, the prime Contractor shall submit with its Bid a list of subcontractors who will perform work in excess of one-half of one percent (0.5%) of the prime Contractor’s total Bid or $10,000, whichever is greater.
Subcontractors listed must be properly licensed for the type of work they are to perform, and their license numbers must be indicated below. Do not list alternate subcontractors for the same work.
Name under which
Subcontractor is licensed
License No.
and Class
Address of Office,
Mill or Shop
DBE
(Yes/No)
Bid
Item
No(s).
Description of
Subcontractor’s
Portion of Work
Dollar Value
of
Subcontract
(Provide additional copies of this sheet if needed)
Sael Construction Corporation
N/A
ACCORDING TO CSLB, SAEL CONSTRUCTION ONLY CARRIES A CLERICAL/OFFICEWORKERS COMP CODE (8810 SEE ATTACHED) THIS WOULD INDICATE SAEL UTILIZING SUBCONTRACTORS HOWEVER, NONE ARE LISTED 08/11/2026 C11 23 of 436
41 NON-COLLUSION DECLARATION
NORTH INDIANA AVENUE SIDEWALK IMPROVEMENTS (C.I.P. No. 8402B)
TO BE EXECUTED BY BIDDER AND SUBMITTED WITH BID
The undersigned declares:
I am the __________________ of _________________________________, the party making the foregoing bid. (Title) (Company Name)
The bid is not made in the interest of, or on behalf of, any undisclosed person, partnership, company, association, organization, or corporation. The bid is genuine and not collusive or sham. The bidder has not directly or indirectly induced or solicited any other bidder to put in a false or sham bid. The bidder has not directly or indirectly colluded, conspired, connived, or agreed with any bidder or anyone else to put in a sham bid, or to refrain from bidding. The bidder has not in any manner, directly or indirectly, sought by agreement, communication, or conference with anyone to fix the bid price of the bidder or any other bidder, or to fix any overhead, profit, or cost element of the bid price, or of that of any other bidder. All statements contained in the bid are true. The bidder has not, directly or indirectly, submitted his or her bid price or any breakdown thereof, or the contents thereof, or divulged information or data relative thereto, to any corporation, partnership, company, association, organization, bid depository, or to any member or agent thereof, to effectuate a collusive or sham bid, and has not paid, and will not pay, any person or entity for such purpose.
Any person executing this declaration on behalf of a bidder that is a corporation, partnership, joint venture, limited liability company, limited liability partnership, or any other entity, hereby represents that he or she has full power to execute, and does execute, this declaration on behalf of the bidder.
I declare under penalty of perjury under the laws of the State of California that the foregoing is true and correct and that this declaration is executed on
________________________, at ________________________________, ___________________________.” (Date) (City) (State)
________________________________________
Signature
________________________________________
Printed Name
________________________________________
Title
President Sael Construction Corporation
06/24/2026 San Diego California
Ahmed Hussein
President
08/11/2026 C11 24 of 436
42 CONTRACTOR’S CERTIFICATION ON FEDERAL CONTRACT
REQUIREMENTS
I hereby certify that I have reviewed the federal construction contract-related requirements (included in appendices A, B, and C) imposed on the Contractor(s) of CDBG Grant Program- funded construction projects and fully understand all my obligations if the project is awarded to me.
Project Name:
Location:
Amount of Bid: $
Name of Bidder
Print Name and Title
Street Address
City, State Zip Code
Signature
North Indiana Avenue Sidewalk Improvements (C.I.P. No. 8402B) Type text hereVista, California
Sael Construction Corporation
Ahmed Hussein / President
2173 Camino Del Este #6115
San Diego, CA92108
165,655$164,655
08/11/2026 C11 25 of 436
43 Certification Regarding Debarment, Suspension, Proposed Debarment, and Other Responsibility Matters (Per 48CFR 52.209-5)
1. The Bidder certifies, to the best of its knowledge and belief, that the Bidder and its Principals, and any of its prospective subcontractors for this award:
a) Are not presently debarred, suspended, proposed for debarment, or declared ineligible for the award of contracts by any Federal, State or local agency;
b) Have not, within a three-year period preceding this offer, been convicted of or had a civil judgment rendered against them for: commission of fraud or a criminal offense in connection with obtaining, attempting to obtain, or performing a public (Federal, State, or local) contract or subcontract; violation of Federal or State antitrust statutes relating to the submission of offers; or commission of embezzlement, theft, forgery, bribery, falsification or destruction of records, making false statements, tax evasion, violating Federal, State or local criminal tax laws, or receiving stolen property (if Bidder checks “have”, the Bidder shall also see 52.209-7, if included in this solicitation);
c) Are not presently indicted for, or otherwise criminally or civilly charged by a governmental entity with, commission of any of the offenses enumerated in subdivision (a)(1)(i)(B) of this provision;
d) Have not, within a three-year period preceding this offer, been notified of any delinquent Federal, State or local taxes in an amount that exceeds $3,000 for which the liability remains unsatisfied.
e) Have not, within a 3-year period preceding this offer, had one or more contracts terminated for default by any Federal, State or local agency; and
f) Do not have an Active Exclusion on the System for Award Management (SAM), which is available at https://sam.gov/
2. The Bidder shall provide immediate written notice to the Contracting Officer if, at any time prior to contract award, the Bidder learns that its certification was erroneous when submitted or has become erroneous by reason of changed circumstances.
3. The certification in paragraph (1) of this provision is a material representation of fact upon which reliance was placed when making award. If it is later determined that the Bidder knowingly rendered an erroneous certification, in addition to other remedies available to the Government, the Contracting Officer may terminate the contract resulting from this award for default.
4. Where the Bidder is unable to certify to any of the statements in this certification, such prospective participant shall attach an explanation to this certification form.
Company Name: Date:
Name: Signature:
(President or Authorized Official of Consultant)
Guidance:
(A) Bidder’s (or its subconsultant’s) inability to certify to the items in paragraph (1)(B), (1)(C), (1)(D), and (1)(E) will not necessarily result in withholding of an award. However, this certification will be considered in connection with a determination of the Bidder's responsibility. Failure of the Bidder to furnish a certification or provide such additional information as required in paragraph (4) above or as requested by the Contracting Officer may render Sael Construction Corporation 06/24/2026
Ahmed Hussein
08/11/2026 C11 26 of 436
44 Certification Regarding Debarment CONT.
the Bidder nonresponsible. Nothing contained in the foregoing shall be construed to require establishment of a system of records in order to render, in good faith, the certification required by paragraph (1) above. The knowledge and information of an Bidder is not required to exceed that which is normally possessed by a prudent person in the ordinary course of business dealings.
(B) “Principal”, for the purposes of this certification, means an officer, director, owner, partner, or a person having primary management or supervisory responsibilities within a business entity (e.g., general manager; plant manager; head of a division or business segment; and similar positions). (C) Federal taxes are considered delinquent if both of the following criteria apply:(i) The tax liability is finally determined. The liability is finally determined if it has been assessed. A liability is not finally determined if there is a pending administrative or judicial challenge. In the case of a judicial challenge to the liability, the liability is not finally determined until all judicial appeal rights have been exhausted. (ii) The taxpayer is delinquent in making payment. A taxpayer is delinquent if the taxpayer has failed to pay the tax liability when full payment was due and required. A taxpayer is not delinquent in cases where enforced collection action is precluded.
Examples. (i) The taxpayer has received a statutory notice of deficiency, under I.R.C. § 6212, which entitles the taxpayer to seek Tax Court review of a proposed tax deficiency. This is not a delinquent tax because it is not a final tax liability. Should the taxpayer seek Tax Court review, this will not be a final tax liability until the taxpayer has exercised all judicial appeal rights. (ii) The IRS has filed a notice of Federal tax lien with respect to an assessed tax liability, and the taxpayer has been issued a notice under I.R.C. § 6320 entitling the taxpayer to request a hearing with the IRS Office of Appeals contesting the lien filing, and to further appeal to the Tax Court if the IRS determines to sustain the lien filing. In the course of the hearing, the taxpayer is entitled to contest the underlying tax liability because the taxpayer has had no prior opportunity to contest the liability. This is not a delinquent tax because it is not a final tax liability. Should the taxpayer seek tax court review, this will not be a final tax liability until the taxpayer has exercised all judicial appeal rights.(iii) The taxpayer has entered into an installment agreement pursuant to I.R.C. § 6159. The taxpayer is making timely payments and is in full compliance with the agreement terms. The taxpayer is not delinquent because the taxpayer is not currently required to make full payment.(iv) The taxpayer has filed for bankruptcy protection. The taxpayer is not delinquent because enforced collection action is stayed under 11 U.S.C. 362 (the Bankruptcy Code). 08/11/2026 C11 27 of 436
45 _________
______________
_________
_____________
_______________________
DISCLOSURE OF LOBBYING ACTIVITIES Approved by OMB
Complete this form to disclose lobbying activities pursuant to 31 U.S.C. 1352 0348-0046 (See reverse for public burden disclosure.)
1. Type of Federal Action:
a.contract
b.grant
c.cooperative agreement
d.loan
e.loan
f.loan insurance
2. Status of Federal Action:
a.bid/offer/application
b.initial award
c.post-award
3. Report Type:
a.initial filing
b.material change
For Material Change Only:
year quarter
date of last report
4. Name and Address of Reporting Entity:
Prime Subawardee
Tier , if known :
Congressional District, if known : 4c
5. If Reporting Entity in No. 4 is a Subawardee, Enter Name and Address of Prime:
Congressional District, if known :
6. Federal Department/Agency:7. Federal Program Name/Description:
CFDA Number, if applicable :
8. Federal Action Number, if known :9. Award Amount, if known :
$
10. a. Name and Address of Lobbying Registrant b. Individuals Performing Services (including address if ( if individual, last name, first name, MI ):different from No. 10a ) (last name, first name, MI ):
11. Information requested through this form is authorized by title 31 U.S.C. section 1352. This disclosure of lobbying activities is a material representation of fact upon which reliance was placed by the tier above when this transaction was made or entered into. This disclosure is required pursuant to 31 U.S.C. 1352. This information will be available for public inspection. Any person who fails to file the required disclosure shall be subject to a civil penalty of not less than $10,000 and not more than $100,000 for each such failure.
Signature:
Print Name:
Title:
Telephone No.:Date:
Federal Use Only:Authorized for Local Reproduction
Standard Form LLL (Rev. 7-97)
INDICATE “N/A”IF NO LOBBYING ACTIVITIES
loan
loan
loan insurance
guarantee
N/A
NOT COMPLETED
08/11/2026 C11 28 of 436
46 INSTRUCTIONS FOR COMPLETION OF SF-LLL, DISCLOSURE OF LOBBYING ACTIVITIES This disclosure form shall be completed by the reporting entity, whether subawardee or prime Federal recipient, at the initiation or receipt of a covered Federal action, or a material change to a previous filing, pursuant to title 31 U.S.C. section 1352. The filing of a form is required for each payment or agreement to make payment to any lobbying entity for influencing or attempting to influence an officer or employeeof any agency, a Member of Congress, an officer or employeeof Congress, or an employeeof a Member of Congress in connection with a covered Federal action. Completeall items that apply for both the initial filing and material change report. Refer to the implementing guidance published by the Office of Management and Budget for additional information.
1. Identify the type of covered Federal action for which lobbying activity is and/or has been secured to influence the outcome of a covered Federal action.
2. Identify the status of the covered Federal action.
3. Identify the appropriate classification of this report. If this is a followup report caused by a material change to the information previously reported, enter the year and quarter in which the change occurred. Enter the date of the last previously submitted report by this reporting entity for this covered Federal action.
4. Enter the full name,address, city, State and zip code of the reportingentity.Include CongressionalDistrict, if known. Check the appropriate classification of the reporting entity that designates if it is, or expects to be, a prime or subaward recipient. Identify the tier of the subawardee, e.g., the first subawardee of the prime is the 1st tier. Subawards include but are not limited to subcontracts, subgrants and contract awards under grants.
5. If the organization filing the report in item 4 checks "Subawardee," then enter the full name, address, city, State and zip code of the prime Federal recipient. Include Congressional District, if known.
6. Enter the name of the Federal agency making the award or loan commitment. Include at least one organizationallevel below agency name, if known. For example, Department of Transportation, United States Coast Guard.
7. Enter the Federal program name or description for the covered Federal action (item 1). If known, enter the full Catalog of Federal Domestic Assistance (CFDA) number for grants, cooperative agreements, loans, and loan commitments.
8. Enter the most appropriate Federal identifying number available for the Federal action identified in item 1 (e.g., Request for Proposal (RFP) number; Invitation for Bid (IFB) number; grant announcement number; the contract, grant, or loan award number; the application/proposal control number assigned by the Federal agency). Include prefixes, e.g., "RFP-DE-90-001."
9. For a covered Federal action where there has been an award or loan commitment by the Federal agency, enter the Federal amount of the award/loan commitment for the prime entity identified in item 4 or 5.
10. (a) Enter the full name, address, city, State and zip code of the lobbying registrant under the Lobbying Disclosure Act of 1995 engaged by the reporting entity identified in item 4 to influence the covered Federal action. (b) Enter the full names of the individual(s) performing services, and include full address if different from 10 (a). Enter Last Name, First Name, and Middle Initial (MI).
11. The certifying official shall sign and date the form, print his/her name, title, and telephone number.
According to the Paperwork Reduction Act, as amended, no persons are required to respond to a collection of information unless it displays a valid OMB Control Number. The valid OMB control number for this information collection is OMB No. 0348-0046. Public reporting burden for this collection of information is estimated to average 10 minutes per response, including time for reviewing instructions, se arching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding the burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Office of Management and Budget, Paperwork Reduction Project (0348-0046), Washington, DC 20503.
08/11/2026 C11 29 of 436
47 EQUAL EMPLOYMENT OPPORTUNITY CERTIFICATION
Executive Order 11246
This certification is required pursuant to Executive Order 11246 (30 F. R. 12319-25). The implementing rules and regulations provide that any bidder or prospective contractor, or any of their proposed subcontractors, shall state as an initial part of the bid or negotiations of the contract whether it has participated in any previous contract or subcontract subject to the equal opportunity clause, and, if so, whether it has filed all compliance reports due under applicable instructions.
Where the certification indicates that the bidder has not filed a compliance report due under applicable instructions, such bidder shall be required to submit a compliance report within seven calendar days after bid opening. No contract shall be awarded unless such report is submitted.
1. Bidder has participated in a previous contract or subcontract subject to the Equal Opportunity Clauses, as required by Executive Orders 10925, 11114, 11246, or 11375.
YES, If yes, identify the most recentcontract:
NO
2. Compliance reports were required to be filed in connection with such contract or subcontract.
YES, If yes, identify the most recentcontract:
NO
3. Bidder has filed all compliance reports due under applicable instructions.
YES
NO
4. Have you ever been or are you being considered for sanction due to violation of Executive Order 11246, as amended?
YES
NO
Company:
Signature Title Date
Signature Title Date
City of El Cajon
City of El Cajon
Sael Construction Corporation
President 06/24/2026
NO CONTRACT PROVIDED
NO CONTRACT PROVIDED
08/11/2026 C11 30 of 436
48 NON-SEGREGATED FACILITIES CERTIFICATION EXECUTIVE ORDER 11246 (30 F.R. 12319-25)
This certification is required pursuant to Executive Order 11246 (30 F.R. 12319-25). The bidder's attention is called to the clause entitled Equal Employment Opportunity of the General Conditions of the Contract for Construction.
"Segregated facilities," as used in this provision, means any waiting rooms, work areas, rest rooms and wash rooms, restaurants and other eating areas, time clocks, locker rooms and other storage or dressing areas, parking lots, drinking fountains, recreation or entertainment areas, transportation, and housing facilities provided for employees, that are segregated by explicit directive or are in fact segregated on the basis of race, color, religion, or national origin because of habit, local custom, or otherwise.
By the submission of this bid, the bidder certifies that it does not and will not maintain or provide for its employees any segregated facilities at any of its establishments, and that it does not and will not permit its employees to perform their services at any location under its control where segregated facilities are maintained. The bidder agrees that a breach of this certification is a violation of the Equal Employment Opportunity clause in the contract.
The bidder further agrees that (except where it has obtained identical certifications from proposed subcontractors for specific time periods) prior to entering into subcontracts which exceed $10,000 and are not exempt from the requirements of the Equal Employment Opportunity clause, it will obtain identical certifications from the proposed subcontractors; retain the certifications in its files; and forward the following notice to the proposed subcontractors (except if the proposed subcontractors have submitted identical certifications for specific timeperiods):
Notice to Prospective Subcontractors of Requirement for Certifications of Non- segregated Facilities
A Certification of Non-segregated Facilities must be submitted before the award of a subcontract exceeding $10,000 which is not exempt from the provisions of the Equal Employment Opportunity clause of the prime contract. The certification may be submitted either for each subcontract or for all subcontracts during a period (i.e., quarterly, semiannually, or annually).
I, hereby certify that all the information stated herein, as well as any information provided in the accompaniment herewith, is true and accurate.
Company:
Signature Title Date
Signature Title Date
Sael Construction Corporation
President 06/24/2026
08/11/2026 C11 31 of 436
49 NON-LOBBYING CERTIFICATION FOR FEDERAL-AID CONTRACTS
The prospective participant certifies, by signing and submitting this bid or proposal, to the best of his or her knowledge and belief, that:
1. No Federal appropriated funds have been paid or will be paid, by or on behalf of the undersigned, to any person for influencing or attempting to influence an officer or employee of any Federal agency, a Member of Congress, an officer or employee of Congress, or an employee of a Member of Congress in connection with the awarding of any Federal contract, the making of any Federal grant, the making of any Federal loan, the entering into of any cooperative agreement, and the extension, continuation, renewal, amendment, or modification of any Federal contract, grant, loan, or cooperative agreement.
2. If any funds other than Federal appropriated funds have been paid or will be paid to any person for influencing or attempting to influence an officer or employee of any Federal agency, a Member of Congress, an officer or employee of Congress, or an employee of a Member of Congress in connection with this Federal contract, grant, loan, or cooperative agreement, the undersigned shall complete and submit Standard Form-LLL, "Disclosure of Lobbying Activities," in conformance with its instructions.
This certification is a material representation of fact upon which reliance was placed when this transaction was made or entered into. Submission of this certification is a prerequisite for making or entering into this transaction imposed by Section 1352, Title 31, U.S. Code. Any person who fails to file the required certification shall be subject to a civil penalty of not less than $10,000 and not more than $100,000 for each suchfailure.
The prospective participant also agrees by submitting his or her bid or proposal that he or she shall require that the language of this certification be included in all lower tier subcontracts, which exceed $100,000 and that all such subrecipients shall certify and disclose accordingly.
BIDDER’S SIGNATURE DATE
06/24/2026
08/11/2026 C11 32 of 436
50 NON-COLLUSION DECLARATION
, being first duly sworn, deposes and says that
he is of the party making the
attached bid; that the bid is not made in the interest of, or on behalf of, any undisclosed person, partnership, company, association, organization, or corporation; that the bid is genuine and not collusive or sham; that the bidder has not directly or indirectly induced or solicited any other bidder to put in a false or sham bid, and has not directly or indirectly colluded, conspired, connived, or agreed with any bidder or anyone else to put in a sham bid, or that anyone shall refrain from bidding; that the bidder has not in any manner, directly or indirectly, sought by agreement, communication, or conference with anyone to fix the bid price of the bidder or any other bidder, or to fix any overhead, profit, or cost element of the bid price, or of that of any other bidder, or to secure any advantage against the public body awarding the contract of anyone interested in the proposed contract; that all statements contained in the bid are true; and, further, that the bidder has not, directly or indirectly, submitted his or her bid price or any breakdown thereof, or the contents thereof, or divulged information or data relative thereto, or paid, and will not pay, any fee to any corporation, partnership, company association, organization, bid depository, or to any member or agent thereof to effectuate a collusive or sham bid.
I certify (or declare) under penalty of perjury under the laws of the State of California that the foregoing is true and correct.
Name of Bidder
Signature
Printed Name and Title
Dated
Ahmed Hussein
President Sael Construction Corporation
Sael Construction Corporation
Ahmed Hussein / President
06/24/2026
08/11/2026 C11 33 of 436
08/11/2026 C11 34 of 436
BOND NOT SIGNED OR NOTARIZED BY PRINCIPLE AS REQUIRED ABOVE 08/11/2026 C11 35 of 436
08/11/2026 C11 36 of 436
08/11/2026 C11 37 of 436
08/11/2026 C11 38 of 436
08/11/2026 C11 39 of 436
NOTICE OF INTENT TO AWARD CONTRACT
City Project Name: Street Rehabilitation Project 2025 (CIP Nos. 8313 & 8225)
Bid Opening Date: 05/27/2025 NOI Posting Date: 05/28/2025 Project Manager: Matt Atteberry NOI Posting Location: OpenGov.com
This is a notice of the City of Vista’s intent to award a contract for the above-referenced project. Staff intends to recommend that the City of Vista City Council award the above-referenced project to:
Rove Engineering, Inc.
Any bidder who submits a valid bid shall have the right to file a bid protest before 5:00 p.m. on the fifth working day following the posting date of this Notice of Intent to Award. However, if bidder has requested and not received copies of competitor bids by the deadline, bidder may submit a bid protest before 5:00 p.m. on the fifth working day following the date on which bidder receives copies of competitor bids. Bid protests must be submitted in writing to the City Engineer of the City of Vista, City of Vista Civic Center, Engineering Department, 200 Civic Center Drive, Vista, California 92084- 6275.
All protests shall contain: (i) a complete statement of the basis for the protest; (ii) the specific portion, or portions, of the document that form the basis of the protest; and (iii) the name, address, and telephone number of the person representing the protesting party. The party fling the protest shall concurrently transmit a copy of the initial protest document, and any attached documentation, to all other parties with a direct financial interest that may be adversely affected by the outcome of the protest, including all other bidders or proposers who appear to have a reasonable prospect of receiving an award depending upon the outcome of the protest. 08/11/2026 C11 40 of 436
08/11/2026 C11 41 of 436
EXHIBIT 3
08/11/2026 C11 42 of 436
California Contractor’s License # A/B – 1073141
5811 Barbarossa Ct., San Diego, CA 92115 | (760) 497-6668 | [email protected] SBA 8(a) DBE #51009 ELBE/SLBE #17RC1818 DGS SBE #2027349 PSWMSDC MBE #AZ17581 CPUC MBE #22000146 DIR #1000855111
June 29, 2026
Project: – North Indiana Avenue Sidewalk Improvements (C.I.P. No. 8402B)
Subject: Protest of the Bid Submitted by Sael Construction Corporation
Dear City Engineer:
This letter constitutes a formal bid protest submitted by RAC Construction & Engineering, Inc. ("Protestor") concerning the bid submitted by Sael Construction Corporation ("Sael") for the above- referenced project. This protest is filed in accordance with the City's protest procedures. Protestor submited a valid bid on this project and has a direct financial interest in the outcome.
For the reasons set forth below, Protestor respectfully requests that the City find Sael's bid non- responsive and Sael a non-responsible bidder, and that the City reject Sael's bid in its entirety.
I. STATEMENT OF THE BASIS FOR THE PROTEST
Sael's bid package contains numerous material defects, omissions, false statements, and internal inconsistencies that go to the responsiveness of the bid and the responsibility of the bidder. Each deficiency is identified below with reference to the specific portion of the bid documents at issue.
A. The Bid Proposal Is Not Signed (Pages 27–30)
08/11/2026 C11 43 of 436
California Contractor’s License # A/B – 1073141
5811 Barbarossa Ct., San Diego, CA 92115 | (760) 497-6668 | [email protected] SBA 8(a) DBE #51009 ELBE/SLBE #17RC1818 DGS SBE #2027349 PSWMSDC MBE #AZ17581 CPUC MBE #22000146 DIR #1000855111
The Bid Proposal signature page contains no signature on the "BY" signature line. The bid proposal itself is therefore unexecuted. An unsigned bid proposal is a material defect that renders the bid non- responsive, as the City cannot enforce the bidder's offer.
B. No Corporate Seal Affixed (Page 30)
The space designated for the corporate seal is blank. No corporate seal was affixed to the bid proposal as called for on the form.
C. No Surety Listed / Misidentified Surety (Page 30)
The "Surety or Sureties" field does not identify a surety — it contains only the word "Bond." In addition, the insurance company is listed as "Western Surety Company." The bidder failed to properly name its surety in the space provided as required.
D. Contractor's Licensing Statement Left Blank / Wrong Entity Type (Page 38)
Sael's W-9 identifies the company as an S-Corporation, yet the corporation section of the Contractor's Licensing Statement was left entirely blank. Instead, the bidder completed the statement as an Individual Contractor. The form was not completed in the section appropriate to the bidder's actual legal structure.
E. False, Incomplete, and Defective Project References (Page 39)
08/11/2026 C11 44 of 436
California Contractor’s License # A/B – 1073141
5811 Barbarossa Ct., San Diego, CA 92115 | (760) 497-6668 | [email protected] SBA 8(a) DBE #51009 ELBE/SLBE #17RC1818 DGS SBE #2027349 PSWMSDC MBE #AZ17581 CPUC MBE #22000146 DIR #1000855111
The Project References page directs the bidder to list ALL public-agency contracts within the past five years performed as the General (or Prime) Contractor on projects of similar size and complexity. Sael's references are materially false and/or incomplete:
Reference 1 – City of Vista, Street Rehabilitation Project 2025 ($450,000): This project was awarded to Rove Engineering, Inc., not Sael. Sael was not the prime/general contractor. (See City of Vista Notice of Intent to Award and OpenGov record:
https://procurement.opengov.com/portal/cityofvista/projects/167089/selected-vendor.) The listed completion date — "02/30/2026" — is also an impossible date (February has no 30th day) and is a future date.
Reference 2 – City of La Mesa, Street Resurfacing Project ($80,000): This project was awarded to Pal General Engineering, not Sael. Sael was not the prime/general contractor. (See https://vendors.planetbids.com/portal/15382/bo/bo-detail/87529#bidResults.) Reference 3 – City of San Diego, I-15/Friars Road Interchange Project ($390,000): No records exist of Sael Construction ever working as a prime/general contractor for the City of San Diego. (See https://www.sandiego.gov/cip/reports/constructioncontracts.) The references also fail to provide required contact information (contact person and phone) and fail to provide a description of work.
Misrepresenting prior prime/general contractor experience is a material misstatement bearing directly on both responsiveness and the bidder's responsibility and qualifications.
F. Defective Subcontractor List (Page 40)
The Contractor's List of Subcontractors states "N/A." However, per the California Contractors State License Board (CSLB), Sael Construction carries only a clerical/office workers' compensation classification code (8810 – Clerical Office Employees). This strongly indicates that Sael does not self- perform field construction work and intends to use subcontractors, yet none are listed, in apparent conflict with the Subletting and Subcontracting Fair Practices Act (Public Contract Code Div. 2, Pt. 1, Ch. 4) and the self-performance requirements of the bid documents.
08/11/2026 C11 45 of 436
California Contractor’s License # A/B – 1073141
5811 Barbarossa Ct., San Diego, CA 92115 | (760) 497-6668 | [email protected] SBA 8(a) DBE #51009 ELBE/SLBE #17RC1818 DGS SBE #2027349 PSWMSDC MBE #AZ17581 CPUC MBE #22000146 DIR #1000855111
G. Inconsistent and Defective Bid Amount; Placeholder Text (Page 42)
The Contractor's Certification on Federal Contract Requirements shows a conflicting bid amount — "165,655" and "$164,655." The two figures do not agree.
H. EEO Certification – Unsupported Claims (Page 47)
On the Equal Employment Opportunity Certification, Sael answered "YES" to having participated in a prior contract subject to the equal opportunity clause and identified the City of El Cajon, but no contract was provided in either location where the most recent contract was to be identified.
I. Bid Bond Not Signed or Notarized by the Principal (Pages 53–54)
The Bid Bond was not signed by the Principal (Sael). The "Principal" signature block, name, and title are blank, and there is no corporate seal for the Principal. The bond form expressly requires: "This bond must be dated, all signatures must be notarized, and evidence of the authority of any person signing as attorney-in-fact must be attached." The bond bears only the Surety's attorney-in-fact signature (Caleb Cathey) and notarization; the Principal failed to execute and notarize the bond as required. A defective bid security renders the bid non-responsive.
J. Bidder Responsibility – Pending CSLB Citation (CSLB Records)
CSLB records reflect a pending citation against Sael Construction Corporation (Citation No. 2 2024 001823, dated 01/24/2025, Status: PENDING). This pending disciplinary matter is relevant to the City's determination of Sael's responsibility as a bidder.
08/11/2026 C11 46 of 436
California Contractor’s License # A/B – 1073141
5811 Barbarossa Ct., San Diego, CA 92115 | (760) 497-6668 | [email protected] SBA 8(a) DBE #51009 ELBE/SLBE #17RC1818 DGS SBE #2027349 PSWMSDC MBE #AZ17581 CPUC MBE #22000146 DIR #1000855111
II. SPECIFIC PORTIONS OF THE DOCUMENTS FORMING THE BASIS OF THE PROTEST
Bid Proposal and signature page (pp. 27–30) – unsigned bid; no corporate seal; no surety listed; misspelled surety.
Contractor's Licensing Statement (p. 38) – corporation section blank; Project References (p. 39) – false/incomplete prime-contractor references; impossible completion date; missing contact and work-description information.
Contractor's List of Subcontractors (p. 40) – "N/A" inconsistent with CSLB classification (8810).
Contractor's Certification on Federal Contract Requirements (p. 42) – conflicting bid amounts; placeholder text.
Equal Employment Opportunity Certification (p. 47) – unsupported prior-contract claims.
Bid Bond and notarial certificate (pp. 53–54) – Principal failed to sign/notarize.
CSLB License Detail (Workers' Comp classification 8810) and Complaint Disclosure (pending citation).
III. RELIEF REQUESTED
Based on the foregoing material defects, misrepresentations, and inconsistencies, Protestor respectfully requests that the City:
Find Sael Construction Corporation's bid non-responsive; Find Sael Construction Corporation a non-responsible bidder; and Reject Sael's bid and award the contract to the lowest responsive and responsible bidder.
IV. CONTACT INFORMATION FOR THE PROTESTING PARTY
Ruben Claudio
08/11/2026 C11 47 of 436
California Contractor’s License # A/B – 1073141
5811 Barbarossa Ct., San Diego, CA 92115 | (760) 497-6668 | [email protected] SBA 8(a) DBE #51009 ELBE/SLBE #17RC1818 DGS SBE #2027349 PSWMSDC MBE #AZ17581 CPUC MBE #22000146 DIR #1000855111
CEO
RAC Construction & Engineering, Inc
5811 Barbarossa Ct San Diego CA 92115
760-497-6668
[email protected]
In accordance with the City's protest procedures, Protestor is concurrently transmitting a copy of this protest and all attachments to all other parties with a direct financial interest who may be adversely affected by the outcome, including all bidders with a reasonable prospect of award.
Thank you for your consideration of this protest. Please contact the undersigned with any questions or to request additional supporting documentation.
Respectfully submitted,
Do not hesitate to call me with any questions.
Sincerely,
Ruben Claudio
Owner/President
08/11/2026 C11 48 of 436
27 BID PROPOSAL
From: ______________________________________________________________, Bidder, For: The construction of
STREET IMPROVEMENTS
as specifically set forth in documents entitled
NORTH INDIANA AVENUE SIDEWALK IMPROVEMENTS (C.I.P. No. 8402B) The undersigned hereby proposes and agrees that if his bid as submitted in the attached BID SCHEDULE be accepted, he will contract in the form so approved to perform all work for which a Contract may be awarded him, to furnish any and all plant, labor, services, materials, tools, equipment, supplies, transportation, utilities and all other items and facilities necessary therefore as provided in the Contract Documents, and to do everything required therein for the proposed Project as specifically set forth in said Contract Documents, together with appurtenances thereto, all as set forth on the Drawings and in the Project Specifications and other Contract Documents; and he further proposes and agrees to complete all the Work called for by the Drawings, Project Specifications, and other Contract Documents in strict conformity therewith within the time limits set forth therein; and that he will accept as full payment therefore the prices set forth in the BID SCHEDULE forming a part hereof.
The undersigned hereby submits either a Bid Bond or Bid Security in the form of Cash, a Cashier’s Check,or a Certified Check, using the forms included in these Bid Documents, properly made payable to CITY OF VISTA,hereinafter designated as the Agency,in an amount that is at least ten percent (10%) of the total base bid amount. The Bid Bond or Bid Security is attached hereto and is given as a guaranty that the undersigned will execute the Contract and furnish the required bonds if awarded the Contract and, in case of failure to do so within the time provided, the proceeds of said bond or bid security shall be forfeited to the Agency. The Surety’s liability to the Agency for forfeiture of the face amount of the bond shall be considered as established.
Sael Construction Corporation
08/11/2026 C11 49 of 436
28 It is understood and agreed that:
1. The undersigned has carefully examined all Bid documents and other Documents which will form the Contract, including all addenda as prepared prior to the date of bid opening setting forth any modifications or interpretations of any said documents.
2. The undersigned has, by investigating the site of work, by reviewing and analyzing the Plans and Specifications, and by otherwise familiarizing himself with the Project, has satisfied himself as to the nature and location of the Work and has fully informed himself as to all conditions and matters which can in any way affect the Work or the cost thereof.
3. The undersigned fully understands the scope of the Work and has included in the various related items of Work the cost of all work not listed as a separate item so that the Bid for the Project reflects the total cost for completing the Work in its entirety, has checked carefully all words and figures inserted in this Bid, and he further agrees that the Agency shall in no way be responsible for any errors or omissions in the preparation of this proposal.
4. The undersigned will execute the Contract and furnish the required Performance Bond, Payment Bond, and proof of insurance coverage within the stipulated time after the posting of a notice to him of acceptance of his bid by the Agency; and further, that this bid may not be withdrawn for a period of ninety (90) calendar days after the date set for the opening thereof unless otherwise required by law. If any bidder shall withdraw his bid within said period, the bidder shall be liable under the provisions of the Bid Security, or the bidder and his surety shall be liable under the Bid Bond, as the case may be.
5. The surety or sureties and insurance companies named in the space provided have agreed to furnish bonds, insurance, and endorsements in the form and amounts set forth in the Contract Documents in the event the Contract is awarded on the basis of this proposal.
6. The undersigned hereby certifies that this proposal is genuine and not sham or collusive or made in the interest or in behalf of any person not herein named, and the undersigned has not directly or indirectly induced or solicited any other bidder to put in a sham bid, or any other person, firm or corporation to refrain from bidding,and the undersigned has not in any manner sought by collusion to secure for himself an advantage over any other bidder.
7. In conformance with current statutory requirements of Section 1860, et. seq., of the Labor Code of the State of California, the undersigned confirms the following as his certification:
“I am aware of the provisions of Section 3700 of the Labor Code which require every employer to be insured against liability for workers’ compensation or to undertake self-insurance in accordance with the provisions of that code,and I will comply with such provisions before commencing the performance of the work of this contract.”
8. Receipt of Addenda No. ___ through ___ is hereby acknowledged. (If none, write “NONE”).
1 1
08/11/2026 C11 50 of 436
29 9. The prospective bidder certifies, by INITIALING AFTER THE FOLLOWING STATEMENT and by signing and submitting this bid, to the best of his or her knowledge and belief, that:
No federal appropriated funds have been paid or will be paid, by or on behalf of the undersigned, to any person influencing or attempting to influence an officer or employee of any federal agency, a Member of Congress, an officer or employee of Congress, or an employee of a Member of Congress in connection with the awarding of any federal contract, the making of any federal grant, the making of any federal loan, the entering into of any cooperative agreement, and the extension, continuation, renewal, amendment, or modification of any federal contract, grant, loan, or cooperative agreement.
Initials _______
If any funds other than federal appropriated funds have been paid or will be paid to any person for influencing or attempting to influence an officer or employee of any federal agency, a Member of Congress, an officer or employee of Congress, or an employee of a Member of Congress in connection with this federal contract, grant, loan, or cooperative agreement, the undersigned shall complete and submit Standard Form-LLL, “Disclosure of Lobbying Activities,” in accordance with its instructions. The “Disclosure of Lobby Activities” is form Attachment G on page 12-87 of Exhibit 12-E titled “Federal Requirements for Federal-Aid Construction Project”.
This certification is a material representation of fact upon which reliance was placed when this transaction was made or entered into. Submission of this certification is a prerequisite for making or entering into this transaction imposed by Section 1352, Title 31, U.S. Code. Any person who fails to file the required certifications shall be subject to a civil penalty of not less than $10,000 and not more than $100,000 for each such failure.
The prospective participant also agrees by submitting his or her bid or proposal that he or she shall require that the language of this certification be included in all lower tier subcontracts, which exceed $100,0000 and that all such sub-recipients shall certify and disclose accordingly.
10. In compliance with the Notice Inviting Bids and all the provisions hereinbefore stipulated, the undersigned, with full cognizance thereof, hereby proposes to perform the entire work for the prices set forth in the attached BID SCHEDULE upon which award of the Contract is made. (Continued on next page)
08/11/2026 C11 51 of 436
30 DATE: ________________, 20_____ BIDDER’S NAME___________________________
BY______________________________________
Signature
________________________________________
Printed Name
TITLE____________________________________
BY______________________________________
Signature
________________________________________
Printed Name
TITLE____________________________________
(CORPORATE SEAL) BIDDER'S MAILING ADDRESS:
Name and address of all members ________________________________________ of the firm or names of all officers
of the corporation. ________________________________________
CORPORATION ORGANIZED UNDER THE LAWS
_________________________________ OF THE STATE OF
_________________________________ ________________________________________
_________________________________ CONTRACTOR'S LICENSE # _________________
_________________________________ EXPIRATION DATE_________________________
_________________________________ CONTRACTOR'S LICENSE CLASS______________
_________________________________ SURETY OR SURETIES: _____________________
_________________________________ ________________________________________
_________________________________ INSURANCE COMPANY:
_________________________________ ________________________________________
I certify (or declare) under penalty of perjury under the laws of the State of California that the foregoing is true and correct:
______________ _________________________________
Date CONTRACTOR'S SIGNATURE
June, 24 26 Sael Construction Corporation
Ahmed Hussein
President
Ahmed Hussein
2173 Camino Del Este #6115
San Diego, CA92108 1086338
01/30/2028
A, B
2173 Camino Del Este #6115
San Diego, CA92108
Westren Suerty Company
Bond
06/24/2026
California
NO SURETY LISTED
NO CORP SEAL
NO SIGNITURE ON BID PROPOSAL
08/11/2026 C11 52 of 436
31 BID SCHEDULE
To be completed through the City’s Electronic Bidding System (OpenGov Procurement)
Pursuant to and in compliance with the Notice Inviting Bids and other Contract Documents relating to the proposal for the construction of
STREET IMPROVEMENTS
as specifically set forth in documents entitled
NORTH INDIANA AVENUE SIDEWALK IMPROVEMENTS (C.I.P. No. 8402B)
all in accordance with the Plans and Project Specifications on file at the City of Vista Engineering Department, the undersigned bidder, having familiarized himself with the terms of the Contract, the local conditions affecting the performance of the Contract and the cost of the Work at the place the Work is to be done; and with the Plans, Project Specifications and other Contract Documents, hereby stipulated; the Contractor agrees to complete the Contract, including all of its component parts and everything required to be performed, and to provide and furnish any and all labor, materials, tools, equipment, expendable supplies and all utility and transportation services necessary to perform the Contract, and complete in a workmanlike manner all of the Work required in connection with the Contract, all in strict conformance with the Plans and Project Specifications on file at the City of Vista Engineering Department.
All items shall be finished and functional per Plans and the Contract Documents. Items designated with an ‘S’ in the Bid Item column of the Bid Schedule are Specialty Items per Subsection 3-2 (“SELF-PERFORMACE”) of the San Diego Regional Supplement to the Greenbook.
08/11/2026 C11 53 of 436
32 BID SCHEDULE
(Provided for reference only)
PROJECT NAME: NORTH INDIANA AVENUE SIDEWALK IMPROVEMENTS (C.I.P.No.8402B) TO BE COMPLETED THROUGH THE CITY’S ELECTRONIC OPENGOV PROCUREMENT BIDDING SYSTEM
NOTE 1: The Bid Schedule Worksheet is only provided as a reference for preparing the bid. Only the unit prices and totals entered in the OpenGov Procurement bidding system will be considered valid for purposes of the City’s bid evaluation. The low bidder bid schedule from OpenGov Procurement will be printed and inserted into the final contract documents.
Note 2: Unit prices shall prevail over extended total and grand total prices. Late bids will not be accepted. The following “Description of Base Bid Items” is part of the Bid Schedule and shall be submitted with the bid.
Bid Items
Bid
Item Description Of Work Qty. Unit
GENERAL
1 Mobilization, Demobilization, bonds &
insurance. (5% maximum of Total Base Bid) 1 LS
2 Project Information Sign 2 EA
3 Public Notification per Supplementary General
Provisions, Section 7-12.2 1 LS
4 Storm Water Pollution Prevention and Erosion
Control 1 LS
5 Traffic Control and Construction Staging for all
work 1 LS
6 Utility Potholing and Coordination 1 LS
7 Unforeseen Field Conditions (stipulated amount) $15,000 8 Record Drawing (“As-Built”) Plans (stipulated
amount) $2,000
REMOVAL / RELOCATE / ADJUSTMENT
9 Remove and dispose existing vegetation, roots,
shrubs, landscaping, fences, and any other
existing improvements conflicting with new
improvements.
1 LS
10 Remove Private Property Encroachments at 326
& 332 N Indiana Ave and return encroachments
to property owner
1 LS
11 Tree Removal 4 LS
08/11/2026 C11 54 of 436
33 Bid
Item Description Of Work Qty.Unit
12 Relocate, Reconstruct, Rotate or Replace existing
mailbox and post per City of Vista Standard
Drawing SRF-04 including reflective address
numbers in front and side of mailbox (2”
minimum)
2 EA
13 Relocate existing metal mailbox (includes
construction of new footing) 1 EA
14 Reconfigure Existing Private Irrigation Systems
and Replace Groundcover to Match Existing
Private Landscaping Disturbed by Construction
1 LS
15 Adjust Street Light Utility Box to Finish Grade 1 EA
EARTHWORK
16 Unclassified excavation 1 LS
GENERAL SURFACE IMPROVEMENTS
17 Asphalt concrete pavement for full depth
pavement restoration, 1’ wide slot patch, 6"
depth per SRF-13 58 LF
18 6” Type G’ curb and gutter per SDRSD No. G-2
with 6" of aggregate base 61 LF
19 PCC Cross Gutter and spandrel per SDRSD No. G-
12 on 6" aggregate base (includes curb) 70 SF
20 4" PCC Sidewalk per SDRSD No. G-7 with 6" of
aggregate base 1877 SF
21 PCC Driveway Entrance per SDRSD No. G-14A
with 6" aggregate base 54 SF
22 PCC Alley Driveway Entrance per SDRSD G-14E
on with 6" aggregate base 100 SF
23 PCC curb ramp Type A with grey detectable
warning surface per G-27A on 6” aggregate base 4 EA
24 PCC curb ramp Type D with grey detectable
warning surface per G-31 on 6” aggregate base 1 EA
TRAFFIC IMPROVEMENTS
25 Document existing striping to replace in kind,
remove conflicting markings, install new
striping, crosswalks and pavement markings
per Plan, relocate signs on new posts per TRF-
06 1 LS
BID SCHEDULE WORKSHEET – END
08/11/2026 C11 55 of 436
34 (Provided for reference only)
BID SCHEDULE TO BE COMPLETED THROUGH THE CITY’S ELECTRONIC BIDDING SYSTEM (OPENGOV PROCUREMENT)
NOTE: Determination of the lowest bid shall be based solely on the lowest TOTAL BASE BID FOR IMPROVEMENTS.
Unit prices shall prevail over extended total and grand total prices. Late bids will not be accepted.
Description of Base Bid Items:
(Scan and Include with Bid Package)
Bid Item 1, Mobilization & Demobilization, bonds & insurance. (5% maximum of Total Base Bid): Bid item shall include full compensation for all bonds, insurance, sureties, licenses, permits, facilities, labor, equipment and material necessary to complete all work required in advance of construction operations, and upon the initiation of construction operations, to mobilize all required equipment, materials and personnel on-site, and complete all associated and appurtenant work in accordance with the Standard Specifications, the Supplementary General Provisions, and as directed by the Engineer. The Bid Item shall also include all labor, equipment and material required to clean-up and restore the site, demobilize and remove all equipment, materials, and staging, and complete all work required at the end of construction operations in accordance with the Standard Specifications, the Supplementary General Provisions, and as directed by the Engineer. The lump sum price for this item shall not exceed 5% of the total contract price (5% maximum of Total Bid).
Bid Item 2, Project Information Sign: Bid item shall include full compensation for labor, materials and equipment to fabricate, install and maintain project information sign, placed at the North or South edge of the project, providing project and funding information throughout project duration.
Bid Item 3, Public Notification per Supplementary General Provisions, Section 7-12.2: Bid item shall include all necessary labor, equipment, materials, and all other related costs for preparation, copying, and distribution shall be considered as included in the lump sum price Bid for Public Notification Bid Item 4, Storm Water Pollution Prevention and Erosion Control: Bid item shall include full compensation for submitting the required storm water permit (located in the appendix) including all labor, equipment and materials required to complete all work necessary to install, maintain, repair and replace all temporary construction BMPs to prevent the discharge of any materials into the storm drain system. No additional compensation will be made.
Bid Item 5, Traffic Control and Construction Staging for all work: Bid item shall include full compensation for all labor, equipment and materials required to complete all work required to prepare, submit and obtain approved Traffic Control Plans from the City of Vista Traffic Engineering Department and handle traffic (including flagging costs and person(s) to safely control pedestrian and vehicular traffic for single lane closures, furnish tools, equipment and incidentals, and for doing all work involved in staging constructing, furnishing, placing, removing, storing, maintaining, moving to new locations, replacing and disposing of the components of the traffic control system (including traffic control devices, temporary steel plate bridging, temporary road resurfacing); installation and removal of all required temporary striping and signing associated and appurtenant work as specified in the Standard Specifications, the Supplementary General Provisions, per plans and as directed by the Engineer. No additional compensation will be made.
Bid Item 6, Utility Coordination and Potholing: Bid item shall include full compensation for all labor, equipment, and material required to coordinate with all utilities agencies which “may be affected” or “are affected” by the Work in accordance with the Standard Specifications, the Supplementary General Provisions, and as directed by the Engineer. The location, protection, and restoration of existing utilities and improvements, specifically identified for payment under other bid items shall not be included for payment 08/11/2026 C11 56 of 436
35 within this bid item. All other locations, protection and restoration required to complete the Work shall be incorporated into this bid item.
Bid Item 7, Unforeseen Field Conditions (stipulated amount): Bid item shall include full compensation for all labor, equipment and material required to repair, construct, rehabilitate, remove, dispose, relocate, adjust any necessary and unforeseen site feature, utility infrastructure, surface improvements, or unsuitable soil condition, as directed by the Engineer, according to these specifications. No additional compensation will be made. This Bid Item is not subject to Section 3 Changes In Work, and no payment will be made unless the Engineer provides a written Notice to Proceed, or written approval for this bid item.
Bid Item 8, Record Drawing (“As-Built”) Plans (stipulated amount): Bid item shall include full compensation for all labor, equipment and material required to provide City with accurate “red line” plans showing the exact location of all improvements, existing utilities, that have been modified as part of the Work.
Bid Item 9, Remove and dispose existing vegetation, roots, shrubs, landscaping, fences, and any other existing improvements conflicting with new improvements: Bid item shall include full compensation for all labor, equipment and material required to complete all work necessary to remove and legally dispose all natural and artificial objectionable material within the limits of excavation, as required to complete the Work and additional clearing and grubbing as may be identified within the Contract including but not limited to, landscaping, vegetation, shrubs, tree and shrub trimming, roots, stumps, irrigation, yard drains, AC and PCC driveways, AC and PCC sidewalks, decorative pavers, aggregate base, curbs, gutters, drainage pipes, fences, block walls or other surface features in conflict with the project improvements. No additional compensation will be made.
Bid Item 10, Remove Private Property Encroachments and return encroachments back to property owner: Bid item shall include full compensation for all labor, equipment and material required to complete all work necessary to remove, salvage without damage, store and return all private property encroachments, at 326 & 332 N Indiana Ave, in conflict with the project improvements, in the Public Right of Way back to its respective property owner as required to complete the Work. City sent Notice to Property Owners which ordered the removal of all encroachments by August 1st, 2026. Work under this bid items shall be in accordance with the Contract Drawings, Standard Specifications, the Supplementary General Provisions, the Supplementary Technical Provisions and as directed by the Engineer, any other related work shall be considered as included or included in the costs of other work for this item. No additional compensation will be made.
Bid Item 11, Tree Removal: Bid item shall include full compensation for all labor, equipment and material required to complete all work necessary to remove and legally dispose any tree, stump and root network within the limits of excavation, as required to complete the Work in accordance with the Contract Drawings, Standard Specifications, the Supplementary General Provisions, the Supplementary Technical Provisions and as directed by the Engineer, any other related work shall be considered as included or included in the costs of other work. No additional compensation will be made.
Bid Item 12, 'Relocate, Reconstruct, Rotate or Replace existing mailbox and post per City of Vista Standard Drawing SRF-04 including reflective address numbers in front and side of mailbox (2” minimum): Bid item shall include full compensation for all labor, equipment and material required to complete all work necessary to relocate, reconstruct, rotate or replace existing mailbox and post per City of Vista Standard Drawing SRF- 04 including reflective address numbers in front and side of mailbox (2” minimum), including coordination with property owner, as shown on the plans, in accordance with the Contract Drawings, Standard Specifications, the Supplementary General Provisions, the Supplementary Technical Provisions and as directed by the Engineer, any other related work shall be considered as included or included in the costs of other work. Work associated with notification and any coordination with property owner and/or mail agency is included in the cost of work for this bid item. No additional compensation will be made. 08/11/2026 C11 57 of 436
36 Bid Item 13, Relocate existing metal mailbox (includes construction of new footing): Bid item shall include full compensation for all labor, equipment and material required to complete all work necessary to relocate, remove, rotate and place existing metal mailbox and metal post with new 12”x18”x36” concrete footing, as shown on the plans, in accordance with the Contract Drawings, Standard Specifications, the Supplementary General Provisions, the Supplementary Technical Provisions and as directed by the Engineer, any other related work shall be considered as included or included in the costs of other work. Work associated with notification and any coordination with property owner and/or mail agency is included in the cost of work for this bid item. No additional compensation will be made.
Bid Item 14, Reconfigure Existing Private Irrigation Systems and Replace Groundcover to Match Existing Private Landscaping Disturbed by Construction.: Bid item shall include full compensation for all labor, materials, and equipment required to reconfigure private irrigation affected by the proposed improvements, verify irrigation working order, replace turf/groundcover/sod to match private landscaping as directed by the Engineer, shown on the plans, according to these specifications, plumbing code and any other related work shall be considered as included or included in the costs of other work. No additional compensation will be made.
Bid Item 15, Adjust Street Light Utility Box to Finish Grade: Bid item shall include full compensation for all labor, equipment and material required to adjust existing street light electric pull box covers flush and even with final and temporary finish surfaces per Contract Specifications and any other related work shall be considered as included or included in the costs of other work. No additional compensation will be made.
Bid Item 16, Unclassified excavation: Bid item shall include full compensation for all labor, equipment and material required to complete all work necessary for the roadway, parkway, slope excavation, transitions to existing, grading, compaction, dewatering, export excess material, borrow, subgrade preparation, restoration, and export of excess soil to a legal disposal site as required to complete the Work in accordance with the Standard Specifications, the Supplementary General Provisions, the Supplementary Technical Provisions 300- 2, typical section as shown on the Plans, the Plans and as directed by the Engineer and any other related work shall be considered as included or included in the costs of other work. No additional compensation will be made.
Bid Item 17, Asphalt concrete pavement for full depth pavement restoration, 1’ wide slot patch, 6" depth per SRF-13: Bid item shall include full compensation for all labor, equipment, material, and mobilization for installation of asphalt concrete, i.e. Hot Mix Asphalt (HMA), compacted in place. The Work shall include, but may not necessarily be limited to prime coat, tack coat, distribution, spreading, rolling, compacting, joining, adjusting (resetting) of manholes and other structures, associated and appurtenant work, in accordance with Section 302-5. of the Supplementary General Provisions, the Standard Specifications, the Supplementary Technical Provisions and as directed by the Engineer, called for in the plans and any other related work shall be considered as included or included in the costs of other work. No additional compensation will be made
Bid Item 18, 6” Type ‘G’ curb and gutter per SDRSD No. G-2 with 6” aggregate base: Bid item shall include full compensation for all labor, equipment and material required to construct 6” curb and gutter per SDRSD G-2, on minimum of 6” class 2 base under curb and gutter as directed by the Engineer, shown on the plans, according to these specifications and any other related work shall be considered as included or included in the costs of other work. This bid item includes curb and gutter quantities associated with driveway entrances or driveway wings. No additional compensation will be made.
Bid Item 19, PCC Cross Gutter per SDRSD No. G-12 with 6” aggregate base: Bid item shall include full compensation for all labor, equipment and material required to construct concrete curb, cross gutter and 08/11/2026 C11 58 of 436
37 spandrel per SDRSD G-12, on minimum of 6” class 2 base as directed by the Engineer, shown on the plans, according to these specifications and any other related work shall be considered as included or included in the costs of other work. No additional compensation will be made.
Bid Item 20, 4” PCC sidewalk per SDRSD No. G-07 with 6” aggregate base: Bid item shall include full compensation for all labor, equipment and material required to construct concrete sidewalk per SDRSD G-07, on minimum of 6” class 2 base as directed by the Engineer, shown on the plans, according to these specifications and any other related work shall be considered as included or included in the costs of other work. No additional compensation will be made. This bid item quantity excludes the area of the sidewalk behind all driveway entrances, since that portion is included in the description for the bid item 19 Driveway Entrance.
Bid Item 21, PCC Driveway Entrance per SDRSD No. G-14A per plan with 6" aggregate base: Bid item shall include full compensation for all labor, equipment and material required to dowel new driveway into existing driveway, construct concrete driveway per SDRSD G-14A as modified per plan on 6” compacted aggregate base, as directed by the Engineer, shown on the plans, according to these specifications and any other related work shall be considered as included or included in the costs of other work. No additional compensation will be made
Bid Item 22, PCC Driveway Entrance per SDRSD G-14E with 6" aggregate base: Bid item shall include full compensation for all labor, equipment and material required to dowel new driveway into existing driveway, construct concrete driveway per SDRSD G-14E per plan on 6” compacted aggregate base, as directed by the Engineer, shown on the plans, according to these specifications and any other related work shall be considered as included or included in the costs of other work. No additional compensation will be made
Bid Item 23, PCC curb ramp Type A with grey detectable warning surface per G-27A on 6” aggregate base: Bid item shall include full compensation for all labor, equipment and material required to construct concrete curb ramps with truncated domes (dark grey color), sidewalk, and 6” aggregate base per SDRSD G-29 as directed by the Engineer, shown on the plans, according to these specifications, curb ramp checklist and any other related work shall be considered as included or included in the costs of other work. No additional compensation will be made.
Bid Item 24, PCC curb ramp Type D with grey detectable warning surface per G-31 on 6” aggregate base: Bid item shall include full compensation for all labor, equipment and material required to construct concrete curb ramps with truncated domes (dark grey color), sidewalk, and 6” aggregate base per SDRSD G-31 as directed by the Engineer, shown on the plans, according to these specifications, curb ramp checklist and any other related work shall be considered as included or included in the costs of other work. No additional compensation will be made.
Bid Item 25, Document existing striping to replace in kind, remove conflicting markings, install new striping, crosswalks and pavement markings per Plan, relocate signs on new posts per TRF-06: Bid item shall include full compensation for all labor, equipment and material required to document and remove existing pavement markings (by grinding or sandblasting), install or apply new thermoplastic pavement markings, install or apply painted striping, install or relocate traffic signs on new posts, per Caltrans Standard Details A24A-F, City of Vista Traffic Standards, as directed by the Engineer, shown on the plans, according to these specifications and any other related work shall be considered as included or included in the costs of other work. Prior to construction, contractor shall document all signing and striping that will be affected by construction and replace as needed. No additional compensation will be made.
--END OF BID SCHEDULE--
08/11/2026 C11 59 of 436
38 CONTRACTOR'S LICENSING STATEMENT
The undersigned is licensed in accordance with the laws of the State of California providing for the registration of Contractors.
Contractor's License Number: _________________________________________________________________
Contractor's License Class: _________________________________________________________________
Expiration Date: _________________________________________________________________
(As described in the , complete and sign the
appropriate section for your company)
Name of Individual Contractor (Print or type): ____________________________________________________
Signature of Contractor: _________________________________________________________________
Business Address: _________________________________________________________________
or
Name of Partnership or Joint Venture Firm: ____________________________________________________
Business Address: ________________________________________________________________________
Signature, printed name, title and address of members signing on behalf of the partnership:
Signature: _____________________ Name: ______________________ Title: ______________________
Address: _________________________________________________________________________________
Signature: _____________________ Name: ______________________ Title: ______________________
Address: _________________________________________________________________________________
or
Name of Corporation: ________________________________________________________________________
Business Address: ________________________________________________________________________
Corporation organized under the laws of the State of _____________________________________________
_______________________________________ __________________________________________ Signature of Officer of Corporation Printed Name and Title
_______________________________________ __________________________________________ Signature of Officer of Corporation Printed Name and Title
1086338
A
01/30/2028
Ahmed Hussein
2173 Camino Del Este #6115 San Diego, CA92108
COMPANY IS IDENTIFIED ON IT W-9 AS AN S-CORP AND AREA WAS LEFT BLANK(SEE W-9) 08/11/2026 C11 60 of 436
39 PROJECT REFERENCES
The Bidder shall provide evidence that the Bidder has had the prior experience to properly perform in accordance with the terms of these Plans and Project Specifications.
List contracts with public agencies entered within the past five (5)years of the most recent projects for which the Bidder has completed work of similar size and complexity to this project as the General (or Prime) Contractor, and the names and phone numbers of the contracting public agencies. Make copies of this page for listing additional projects.
Project
No. Date Completed Public Agency Name,
Contact Person & Phone
Project Name and Description of
Work Contract Amount
1. 2.
3. 4.
5. 6.
7. Note: Attached pre-printed list to this page to list additional projects. 02/30/2026 Street Rehabilitation Project 2025 $450,000City of Vist 09/30/2024 City of La Mesa STREET RESURFACING PROJECT $80,000 City of San Diego01/30/2026 I-15/Friars Road Interchange Project $390,000 THIS PROJECT WAS AWARDED TO ROVE ENGINEERING. SAEL WAS NOT THE PRIME/GENERAL AS HIGHLIGHTED IN THE ABOVE INSTRUCTIONS(SEE LINK): https://procurement.opengov.com/portal/cityofvista/projects/167089/selected-vendor THIS PROJECT WAS AWARDED TO PAL GENERAL ENGINEERING. SAEL WAS NOT THE PRIME/GENERAL AS HIGHLIGHTED IN THE ABOVE INSTRUCTIONSSEE LINK: https://vendors.planetbids.com/portal/15382/bo/bo-detail/87529#bidResults NO RECORDS HAVE BEEN LOCATED OF SAEL CONSTRUCTION EVER WORKING IN THE CAPACITY OF A PRIME/GENERAL FOR THE CITY OF SAN DIEGOLINK: https://www.sandiego.gov/cip/reports/constructioncontracts
NO CONTACT INFORMATION PROVIDED NO DESCIPTION OF WORK PROVIDED 08/11/2026 C11 61 of 436
40 CONTRACTOR’S LIST OF SUBCONTRACTORS
PROJECT NAME: NORTH INDIANA AVENUE SIDEWALK IMPROVEMENTS (C.I.P.No.8402B)
NAME OF BIDDER: ______________________________________________________________________________
In accordance with Division 2, Part 1, Chapter 4 of the Public Contract Code, the prime Contractor shall submit with its Bid a list of subcontractors who will perform work in excess of one-half of one percent (0.5%) of the prime Contractor’s total Bid or $10,000, whichever is greater.
Subcontractors listed must be properly licensed for the type of work they are to perform, and their license numbers must be indicated below. Do not list alternate subcontractors for the same work.
Name under which
Subcontractor is licensed
License No.
and Class
Address of Office,
Mill or Shop
DBE
(Yes/No)
Bid
Item
No(s).
Description of
Subcontractor’s
Portion of Work
Dollar Value
of
Subcontract
(Provide additional copies of this sheet if needed)
Sael Construction Corporation
N/A
ACCORDING TO CSLB, SAEL CONSTRUCTION ONLY CARRIES A CLERICAL/OFFICEWORKERS COMP CODE (8810 SEE ATTACHED) THIS WOULD INDICATE SAEL UTILIZING SUBCONTRACTORS HOWEVER, NONE ARE LISTED 08/11/2026 C11 62 of 436
41 NON-COLLUSION DECLARATION
NORTH INDIANA AVENUE SIDEWALK IMPROVEMENTS (C.I.P. No. 8402B)
TO BE EXECUTED BY BIDDER AND SUBMITTED WITH BID
The undersigned declares:
I am the __________________ of _________________________________, the party making the foregoing bid. (Title) (Company Name)
The bid is not made in the interest of, or on behalf of, any undisclosed person, partnership, company, association, organization, or corporation. The bid is genuine and not collusive or sham. The bidder has not directly or indirectly induced or solicited any other bidder to put in a false or sham bid. The bidder has not directly or indirectly colluded, conspired, connived, or agreed with any bidder or anyone else to put in a sham bid, or to refrain from bidding. The bidder has not in any manner, directly or indirectly, sought by agreement, communication, or conference with anyone to fix the bid price of the bidder or any other bidder, or to fix any overhead, profit, or cost element of the bid price, or of that of any other bidder. All statements contained in the bid are true. The bidder has not, directly or indirectly, submitted his or her bid price or any breakdown thereof, or the contents thereof, or divulged information or data relative thereto, to any corporation, partnership, company, association, organization, bid depository, or to any member or agent thereof, to effectuate a collusive or sham bid, and has not paid, and will not pay, any person or entity for such purpose.
Any person executing this declaration on behalf of a bidder that is a corporation, partnership, joint venture, limited liability company, limited liability partnership, or any other entity, hereby represents that he or she has full power to execute, and does execute, this declaration on behalf of the bidder.
I declare under penalty of perjury under the laws of the State of California that the foregoing is true and correct and that this declaration is executed on
________________________, at ________________________________, ___________________________.” (Date) (City) (State)
________________________________________
Signature
________________________________________
Printed Name
________________________________________
Title
President Sael Construction Corporation
06/24/2026 San Diego California
Ahmed Hussein
President
08/11/2026 C11 63 of 436
42 CONTRACTOR’S CERTIFICATION ON FEDERAL CONTRACT
REQUIREMENTS
I hereby certify that I have reviewed the federal construction contract-related requirements (included in appendices A, B, and C) imposed on the Contractor(s) of CDBG Grant Program- funded construction projects and fully understand all my obligations if the project is awarded to me.
Project Name:
Location:
Amount of Bid: $
Name of Bidder
Print Name and Title
Street Address
City, State Zip Code
Signature
North Indiana Avenue Sidewalk Improvements (C.I.P. No. 8402B) Type text hereVista, California
Sael Construction Corporation
Ahmed Hussein / President
2173 Camino Del Este #6115
San Diego, CA92108
165,655$164,655
08/11/2026 C11 64 of 436
43 Certification Regarding Debarment, Suspension, Proposed Debarment, and Other Responsibility Matters (Per 48CFR 52.209-5)
1. The Bidder certifies, to the best of its knowledge and belief, that the Bidder and its Principals, and any of its prospective subcontractors for this award:
a) Are not presently debarred, suspended, proposed for debarment, or declared ineligible for the award of contracts by any Federal, State or local agency;
b) Have not, within a three-year period preceding this offer, been convicted of or had a civil judgment rendered against them for: commission of fraud or a criminal offense in connection with obtaining, attempting to obtain, or performing a public (Federal, State, or local) contract or subcontract; violation of Federal or State antitrust statutes relating to the submission of offers; or commission of embezzlement, theft, forgery, bribery, falsification or destruction of records, making false statements, tax evasion, violating Federal, State or local criminal tax laws, or receiving stolen property (if Bidder checks “have”, the Bidder shall also see 52.209-7, if included in this solicitation);
c) Are not presently indicted for, or otherwise criminally or civilly charged by a governmental entity with, commission of any of the offenses enumerated in subdivision (a)(1)(i)(B) of this provision;
d) Have not, within a three-year period preceding this offer, been notified of any delinquent Federal, State or local taxes in an amount that exceeds $3,000 for which the liability remains unsatisfied.
e) Have not, within a 3-year period preceding this offer, had one or more contracts terminated for default by any Federal, State or local agency; and
f) Do not have an Active Exclusion on the System for Award Management (SAM), which is available at https://sam.gov/
2. The Bidder shall provide immediate written notice to the Contracting Officer if, at any time prior to contract award, the Bidder learns that its certification was erroneous when submitted or has become erroneous by reason of changed circumstances.
3. The certification in paragraph (1) of this provision is a material representation of fact upon which reliance was placed when making award. If it is later determined that the Bidder knowingly rendered an erroneous certification, in addition to other remedies available to the Government, the Contracting Officer may terminate the contract resulting from this award for default.
4. Where the Bidder is unable to certify to any of the statements in this certification, such prospective participant shall attach an explanation to this certification form.
Company Name: Date:
Name: Signature:
(President or Authorized Official of Consultant)
Guidance:
(A) Bidder’s (or its subconsultant’s) inability to certify to the items in paragraph (1)(B), (1)(C), (1)(D), and (1)(E) will not necessarily result in withholding of an award. However, this certification will be considered in connection with a determination of the Bidder's responsibility. Failure of the Bidder to furnish a certification or provide such additional information as required in paragraph (4) above or as requested by the Contracting Officer may render Sael Construction Corporation 06/24/2026
Ahmed Hussein
08/11/2026 C11 65 of 436
44 Certification Regarding Debarment CONT.
the Bidder nonresponsible. Nothing contained in the foregoing shall be construed to require establishment of a system of records in order to render, in good faith, the certification required by paragraph (1) above. The knowledge and information of an Bidder is not required to exceed that which is normally possessed by a prudent person in the ordinary course of business dealings.
(B) “Principal”, for the purposes of this certification, means an officer, director, owner, partner, or a person having primary management or supervisory responsibilities within a business entity (e.g., general manager; plant manager; head of a division or business segment; and similar positions). (C) Federal taxes are considered delinquent if both of the following criteria apply:(i) The tax liability is finally determined. The liability is finally determined if it has been assessed. A liability is not finally determined if there is a pending administrative or judicial challenge. In the case of a judicial challenge to the liability, the liability is not finally determined until all judicial appeal rights have been exhausted. (ii) The taxpayer is delinquent in making payment. A taxpayer is delinquent if the taxpayer has failed to pay the tax liability when full payment was due and required. A taxpayer is not delinquent in cases where enforced collection action is precluded.
Examples. (i) The taxpayer has received a statutory notice of deficiency, under I.R.C. § 6212, which entitles the taxpayer to seek Tax Court review of a proposed tax deficiency. This is not a delinquent tax because it is not a final tax liability. Should the taxpayer seek Tax Court review, this will not be a final tax liability until the taxpayer has exercised all judicial appeal rights. (ii) The IRS has filed a notice of Federal tax lien with respect to an assessed tax liability, and the taxpayer has been issued a notice under I.R.C. § 6320 entitling the taxpayer to request a hearing with the IRS Office of Appeals contesting the lien filing, and to further appeal to the Tax Court if the IRS determines to sustain the lien filing. In the course of the hearing, the taxpayer is entitled to contest the underlying tax liability because the taxpayer has had no prior opportunity to contest the liability. This is not a delinquent tax because it is not a final tax liability. Should the taxpayer seek tax court review, this will not be a final tax liability until the taxpayer has exercised all judicial appeal rights.(iii) The taxpayer has entered into an installment agreement pursuant to I.R.C. § 6159. The taxpayer is making timely payments and is in full compliance with the agreement terms. The taxpayer is not delinquent because the taxpayer is not currently required to make full payment.(iv) The taxpayer has filed for bankruptcy protection. The taxpayer is not delinquent because enforced collection action is stayed under 11 U.S.C. 362 (the Bankruptcy Code). 08/11/2026 C11 66 of 436
45 _________
______________
_________
_____________
_______________________
DISCLOSURE OF LOBBYING ACTIVITIES Approved by OMB
Complete this form to disclose lobbying activities pursuant to 31 U.S.C. 1352 0348-0046 (See reverse for public burden disclosure.)
1. Type of Federal Action:
a.contract
b.grant
c.cooperative agreement
d.loan
e.loan
f.loan insurance
2. Status of Federal Action:
a.bid/offer/application
b.initial award
c.post-award
3. Report Type:
a.initial filing
b.material change
For Material Change Only:
year quarter
date of last report
4. Name and Address of Reporting Entity:
Prime Subawardee
Tier , if known :
Congressional District, if known : 4c
5. If Reporting Entity in No. 4 is a Subawardee, Enter Name and Address of Prime:
Congressional District, if known :
6. Federal Department/Agency:7. Federal Program Name/Description:
CFDA Number, if applicable :
8. Federal Action Number, if known :9. Award Amount, if known :
$
10. a. Name and Address of Lobbying Registrant b. Individuals Performing Services (including address if ( if individual, last name, first name, MI ):different from No. 10a ) (last name, first name, MI ):
11. Information requested through this form is authorized by title 31 U.S.C. section 1352. This disclosure of lobbying activities is a material representation of fact upon which reliance was placed by the tier above when this transaction was made or entered into. This disclosure is required pursuant to 31 U.S.C. 1352. This information will be available for public inspection. Any person who fails to file the required disclosure shall be subject to a civil penalty of not less than $10,000 and not more than $100,000 for each such failure.
Signature:
Print Name:
Title:
Telephone No.:Date:
Federal Use Only:Authorized for Local Reproduction
Standard Form LLL (Rev. 7-97)
INDICATE “N/A”IF NO LOBBYING ACTIVITIES
loan
loan
loan insurance
guarantee
N/A
NOT COMPLETED
08/11/2026 C11 67 of 436
46 INSTRUCTIONS FOR COMPLETION OF SF-LLL, DISCLOSURE OF LOBBYING ACTIVITIES This disclosure form shall be completed by the reporting entity, whether subawardee or prime Federal recipient, at the initiation or receipt of a covered Federal action, or a material change to a previous filing, pursuant to title 31 U.S.C. section 1352. The filing of a form is required for each payment or agreement to make payment to any lobbying entity for influencing or attempting to influence an officer or employeeof any agency, a Member of Congress, an officer or employeeof Congress, or an employeeof a Member of Congress in connection with a covered Federal action. Completeall items that apply for both the initial filing and material change report. Refer to the implementing guidance published by the Office of Management and Budget for additional information.
1. Identify the type of covered Federal action for which lobbying activity is and/or has been secured to influence the outcome of a covered Federal action.
2. Identify the status of the covered Federal action.
3. Identify the appropriate classification of this report. If this is a followup report caused by a material change to the information previously reported, enter the year and quarter in which the change occurred. Enter the date of the last previously submitted report by this reporting entity for this covered Federal action.
4. Enter the full name,address, city, State and zip code of the reportingentity.Include CongressionalDistrict, if known. Check the appropriate classification of the reporting entity that designates if it is, or expects to be, a prime or subaward recipient. Identify the tier of the subawardee, e.g., the first subawardee of the prime is the 1st tier. Subawards include but are not limited to subcontracts, subgrants and contract awards under grants.
5. If the organization filing the report in item 4 checks "Subawardee," then enter the full name, address, city, State and zip code of the prime Federal recipient. Include Congressional District, if known.
6. Enter the name of the Federal agency making the award or loan commitment. Include at least one organizationallevel below agency name, if known. For example, Department of Transportation, United States Coast Guard.
7. Enter the Federal program name or description for the covered Federal action (item 1). If known, enter the full Catalog of Federal Domestic Assistance (CFDA) number for grants, cooperative agreements, loans, and loan commitments.
8. Enter the most appropriate Federal identifying number available for the Federal action identified in item 1 (e.g., Request for Proposal (RFP) number; Invitation for Bid (IFB) number; grant announcement number; the contract, grant, or loan award number; the application/proposal control number assigned by the Federal agency). Include prefixes, e.g., "RFP-DE-90-001."
9. For a covered Federal action where there has been an award or loan commitment by the Federal agency, enter the Federal amount of the award/loan commitment for the prime entity identified in item 4 or 5.
10. (a) Enter the full name, address, city, State and zip code of the lobbying registrant under the Lobbying Disclosure Act of 1995 engaged by the reporting entity identified in item 4 to influence the covered Federal action. (b) Enter the full names of the individual(s) performing services, and include full address if different from 10 (a). Enter Last Name, First Name, and Middle Initial (MI).
11. The certifying official shall sign and date the form, print his/her name, title, and telephone number.
According to the Paperwork Reduction Act, as amended, no persons are required to respond to a collection of information unless it displays a valid OMB Control Number. The valid OMB control number for this information collection is OMB No. 0348-0046. Public reporting burden for this collection of information is estimated to average 10 minutes per response, including time for reviewing instructions, se arching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding the burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Office of Management and Budget, Paperwork Reduction Project (0348-0046), Washington, DC 20503.
08/11/2026 C11 68 of 436
47 EQUAL EMPLOYMENT OPPORTUNITY CERTIFICATION
Executive Order 11246
This certification is required pursuant to Executive Order 11246 (30 F. R. 12319-25). The implementing rules and regulations provide that any bidder or prospective contractor, or any of their proposed subcontractors, shall state as an initial part of the bid or negotiations of the contract whether it has participated in any previous contract or subcontract subject to the equal opportunity clause, and, if so, whether it has filed all compliance reports due under applicable instructions.
Where the certification indicates that the bidder has not filed a compliance report due under applicable instructions, such bidder shall be required to submit a compliance report within seven calendar days after bid opening. No contract shall be awarded unless such report is submitted.
1. Bidder has participated in a previous contract or subcontract subject to the Equal Opportunity Clauses, as required by Executive Orders 10925, 11114, 11246, or 11375.
YES, If yes, identify the most recentcontract:
NO
2. Compliance reports were required to be filed in connection with such contract or subcontract.
YES, If yes, identify the most recentcontract:
NO
3. Bidder has filed all compliance reports due under applicable instructions.
YES
NO
4. Have you ever been or are you being considered for sanction due to violation of Executive Order 11246, as amended?
YES
NO
Company:
Signature Title Date
Signature Title Date
City of El Cajon
City of El Cajon
Sael Construction Corporation
President 06/24/2026
NO CONTRACT PROVIDED
NO CONTRACT PROVIDED
08/11/2026 C11 69 of 436
48 NON-SEGREGATED FACILITIES CERTIFICATION EXECUTIVE ORDER 11246 (30 F.R. 12319-25)
This certification is required pursuant to Executive Order 11246 (30 F.R. 12319-25). The bidder's attention is called to the clause entitled Equal Employment Opportunity of the General Conditions of the Contract for Construction.
"Segregated facilities," as used in this provision, means any waiting rooms, work areas, rest rooms and wash rooms, restaurants and other eating areas, time clocks, locker rooms and other storage or dressing areas, parking lots, drinking fountains, recreation or entertainment areas, transportation, and housing facilities provided for employees, that are segregated by explicit directive or are in fact segregated on the basis of race, color, religion, or national origin because of habit, local custom, or otherwise.
By the submission of this bid, the bidder certifies that it does not and will not maintain or provide for its employees any segregated facilities at any of its establishments, and that it does not and will not permit its employees to perform their services at any location under its control where segregated facilities are maintained. The bidder agrees that a breach of this certification is a violation of the Equal Employment Opportunity clause in the contract.
The bidder further agrees that (except where it has obtained identical certifications from proposed subcontractors for specific time periods) prior to entering into subcontracts which exceed $10,000 and are not exempt from the requirements of the Equal Employment Opportunity clause, it will obtain identical certifications from the proposed subcontractors; retain the certifications in its files; and forward the following notice to the proposed subcontractors (except if the proposed subcontractors have submitted identical certifications for specific timeperiods):
Notice to Prospective Subcontractors of Requirement for Certifications of Non- segregated Facilities
A Certification of Non-segregated Facilities must be submitted before the award of a subcontract exceeding $10,000 which is not exempt from the provisions of the Equal Employment Opportunity clause of the prime contract. The certification may be submitted either for each subcontract or for all subcontracts during a period (i.e., quarterly, semiannually, or annually).
I, hereby certify that all the information stated herein, as well as any information provided in the accompaniment herewith, is true and accurate.
Company:
Signature Title Date
Signature Title Date
Sael Construction Corporation
President 06/24/2026
08/11/2026 C11 70 of 436
49 NON-LOBBYING CERTIFICATION FOR FEDERAL-AID CONTRACTS
The prospective participant certifies, by signing and submitting this bid or proposal, to the best of his or her knowledge and belief, that:
1. No Federal appropriated funds have been paid or will be paid, by or on behalf of the undersigned, to any person for influencing or attempting to influence an officer or employee of any Federal agency, a Member of Congress, an officer or employee of Congress, or an employee of a Member of Congress in connection with the awarding of any Federal contract, the making of any Federal grant, the making of any Federal loan, the entering into of any cooperative agreement, and the extension, continuation, renewal, amendment, or modification of any Federal contract, grant, loan, or cooperative agreement.
2. If any funds other than Federal appropriated funds have been paid or will be paid to any person for influencing or attempting to influence an officer or employee of any Federal agency, a Member of Congress, an officer or employee of Congress, or an employee of a Member of Congress in connection with this Federal contract, grant, loan, or cooperative agreement, the undersigned shall complete and submit Standard Form-LLL, "Disclosure of Lobbying Activities," in conformance with its instructions.
This certification is a material representation of fact upon which reliance was placed when this transaction was made or entered into. Submission of this certification is a prerequisite for making or entering into this transaction imposed by Section 1352, Title 31, U.S. Code. Any person who fails to file the required certification shall be subject to a civil penalty of not less than $10,000 and not more than $100,000 for each suchfailure.
The prospective participant also agrees by submitting his or her bid or proposal that he or she shall require that the language of this certification be included in all lower tier subcontracts, which exceed $100,000 and that all such subrecipients shall certify and disclose accordingly.
BIDDER’S SIGNATURE DATE
06/24/2026
08/11/2026 C11 71 of 436
50 NON-COLLUSION DECLARATION
, being first duly sworn, deposes and says that
he is of the party making the
attached bid; that the bid is not made in the interest of, or on behalf of, any undisclosed person, partnership, company, association, organization, or corporation; that the bid is genuine and not collusive or sham; that the bidder has not directly or indirectly induced or solicited any other bidder to put in a false or sham bid, and has not directly or indirectly colluded, conspired, connived, or agreed with any bidder or anyone else to put in a sham bid, or that anyone shall refrain from bidding; that the bidder has not in any manner, directly or indirectly, sought by agreement, communication, or conference with anyone to fix the bid price of the bidder or any other bidder, or to fix any overhead, profit, or cost element of the bid price, or of that of any other bidder, or to secure any advantage against the public body awarding the contract of anyone interested in the proposed contract; that all statements contained in the bid are true; and, further, that the bidder has not, directly or indirectly, submitted his or her bid price or any breakdown thereof, or the contents thereof, or divulged information or data relative thereto, or paid, and will not pay, any fee to any corporation, partnership, company association, organization, bid depository, or to any member or agent thereof to effectuate a collusive or sham bid.
I certify (or declare) under penalty of perjury under the laws of the State of California that the foregoing is true and correct.
Name of Bidder
Signature
Printed Name and Title
Dated
Ahmed Hussein
President Sael Construction Corporation
Sael Construction Corporation
Ahmed Hussein / President
06/24/2026
08/11/2026 C11 72 of 436
08/11/2026 C11 73 of 436
BOND NOT SIGNED OR NOTARIZED BY PRINCIPLE AS REQUIRED ABOVE 08/11/2026 C11 74 of 436
08/11/2026 C11 75 of 436
08/11/2026 C11 76 of 436
08/11/2026 C11 77 of 436
08/11/2026 C11 78 of 436
NOTICE OF INTENT TO AWARD CONTRACT
City Project Name: Street Rehabilitation Project 2025 (CIP Nos. 8313 & 8225)
Bid Opening Date: 05/27/2025 NOI Posting Date: 05/28/2025 Project Manager: Matt Atteberry NOI Posting Location: OpenGov.com
This is a notice of the City of Vista’s intent to award a contract for the above-referenced project. Staff intends to recommend that the City of Vista City Council award the above-referenced project to:
Rove Engineering, Inc.
Any bidder who submits a valid bid shall have the right to file a bid protest before 5:00 p.m. on the fifth working day following the posting date of this Notice of Intent to Award. However, if bidder has requested and not received copies of competitor bids by the deadline, bidder may submit a bid protest before 5:00 p.m. on the fifth working day following the date on which bidder receives copies of competitor bids. Bid protests must be submitted in writing to the City Engineer of the City of Vista, City of Vista Civic Center, Engineering Department, 200 Civic Center Drive, Vista, California 92084- 6275.
All protests shall contain: (i) a complete statement of the basis for the protest; (ii) the specific portion, or portions, of the document that form the basis of the protest; and (iii) the name, address, and telephone number of the person representing the protesting party. The party fling the protest shall concurrently transmit a copy of the initial protest document, and any attached documentation, to all other parties with a direct financial interest that may be adversely affected by the outcome of the protest, including all other bidders or proposers who appear to have a reasonable prospect of receiving an award depending upon the outcome of the protest. 08/11/2026 C11 79 of 436
SUMMARY CONST – COV FED CDBG
RAC CONSTRUCTION & ENGINEERING, INC.
[00064029-1] 00070093 1
CONSTRUCTION CONTRACT
THIS CONTRACT is made and entered into as of _____________________________ (“Contract Date”), by and between the City of Vista, a chartered municipal corporation (“Agency”), and RAC Construction & Engineering, Inc., a California corporation (“Contractor”). Agency and Contractor are sometimes individually referred to as a “Party” and collectively as “Parties.”
In consideration of the mutual covenants contained herein, Agency and Contractor agree as follows:
SECTION 1
The Contract Documents consisting of the PROJECT SPECIFICATIONS, comprised of the NOTICE INVITING BIDS, the INSTRUCTIONS TO BIDDERS, the accepted BID PROPOSAL; BID SCHEDULE; CONTRACTOR’S LICENSING STATEMENT; PROJECT REFERENCES; CONTRACTOR’S LIST OF SUBCONTRACTORS; CONTRACTOR’S CERTIFICATION ON FEDERAL CONTRACT REQUIREMENTS; CERTIFICATION REGARDING DEBARMENT, SUSPENSION, PROPOSED DEBARMENT, AND OTHER RESPONSIBILITY MATTERS;
DISCLOSURE OF LOBBYING ACTIVITIES AND INSTRUCTIONS FOR COMPLETION OF SF - LLL, DISCLOSURE OF LOBBYING ACTIVITIES; EQUAL EMPLOYMENT OPPORTUNITY CERTIFICATION; NON-SEGREGATED FACILITIES CERTIFICATION; NON-LOBBYING CERTIFICATION FOR FEDERAL-AID CONTRACTS; NON-COLLUSION DECLARATION (Federal Form); ; BID SECURITY FORM (WITH BID BOND, CASH, CERTIFIED CHECK OR CASHIER’S CHECK INCLUDED); the CONSTRUCTION CONTRACT, PAYMENT BOND, CONTRACTOR’S CERTIFICATE, SUPPLEMENTARY GENERAL PROVISIONS, SUPPLEMENTARY TECHNICAL PROVISIONS, Special Provisions, Plans, Standard Plans and Specifications; together with all additions, deletions, modifications, appendices, and all addenda (1), as prepared prior to the date of bid opening setting forth any modifications or interpretations of any said documents, are hereby incorporated in and made a part of this Contract as fully as if set forth herein.
SECTION 2
For and in consideration of the payments and agreements to be made and performed by the Agency as set forth in said Contract Documents, the Contractor agrees with the Agency to construct
NORTH INDIANA AVENUE SIDEWALK PROJECT
as specifically set forth in documents entitled
NORTH INDIANA AVENUE SIDEWALK PROJECT (CIP NO. 8402B)
for which award of the Contract was made, to furnish at his own proper cost and expense all plant, labor, services, materials, tools, equipment, supplies, transportation, utilities and all other items and facilities necessary therefore, as provided in the Contract Documents, and to do everything required therein. In accordance with the provisions of Section 3700 of the Labor Code, the Contractor will be required to secure the payment of Worker’s Compensation Insurance for its employees.
08/11/2026 C11 80 of 436
EXHIBIT 4
SUMMARY CONST – COV FED CDBG Page 2 of 3 RAC CONSTRUCTION & ENGINEERING, INC. [00064029-1] 00070093 1
SECTION 3
For furnishing all said services and materials, payment of premiums on insurance policies, obtaining all permits and licenses of a temporary nature, furnishing and removing all plant, temporary work or structures, tools, and equipment, and for doing all the Work contemplated and embraced in this Contract, also for all loss and damage arising out of the nature of the aforesaid work during its progress or prior to acceptance from the action of the elements and from any unforeseen difficulties which may arise or be encountered in the prosecution of the Work, and for all other risks of any description connected with the Work, also for all expenses incurred by or in consequence of the suspension or discontinuance of work, except such as in the said Contract Documents are expressly stipulated to be borne by the Agency, and for well and faithfully completing the Work and the whole thereof within the stipulated time and in the manner shown and described in the said documents, and in accordance with the requirements of the Engineer under them, the Agency will pay, and the Contractor shall receive in full compensation therefore, the prices set forth by him in the accepted bid. The total compensation will be computed on the basis of the units of work actually performed in accordance with the requirements of the Contract Documents and paid for at the stipulated prices named in the BID SCHEDULE for completion of the Work.
SECTION 4
The Agency hereby promises and agrees with the said Contractor to employ, and does hereby employ the said Contractor to provide the materials and to do the Work according to the terms and conditions herein contained and referre d to, for the price aforesaid, and hereby contracts to pay the same at the time, in the manner, and upon the conditions set forth in the Contract Documents, and the Parties for themselves, their heirs, executors, administrators, successors and assigns do hereby agree to the full performance of the covenants herein contained.
SECTION 5
Contractor agrees to indemnify, defend, and save harmless, the Agency, its officers, agents, employees and volunteers from and against any and all claims, demands, damages, losses and expenses, defense costs including attorney fees, or liability of any kind or nature which the Agency, its officers, agents and employees may sustain or incur or which may be imposed upon them for injury to or death of persons, or damage to property as a result of, arising out of, or in any manner connected with the Contractor’s performance under the terms of this Contract, caused in whole or in part by any negligent or willful acts or omission of the Contractor, any subcontractor, anyone directly or indirectly employed by any of them or anyone for whose acts any of them may be liable, except where caused by the active negligence, sole negligence, or willful misconduct of the Agency.
SECTION 6
Contractor agrees that the Payment Bond and Performance Bond attached to/submitted concurrently with this Contract are for reference purposes only, and shall not be considered a part of this Contract. Contractor further agrees that said bonds are separate obligations of the Contractor and its surety, and that any attorneys’ fee provision contained in any payment bond or performance bond shall not apply to this Contract. In the event there is any litigation between the Parties arising from the breach of this Contract, each Party will bear its own attorneys’ fees in the litigation.
08/11/2026 C11 81 of 436
SUMMARY CONST – COV FED CDBG Page 3 of 3 RAC CONSTRUCTION & ENGINEERING, INC. [00064029-1] 00070093 1
SECTION 7
Contractor agrees to abide by all required contract provisions of fed eral-aid construction contracts per Exhibit A, which is hereby incorporated in and made a part of this Contract as fully as if set forth herein. Contractor agrees to pay generally prevailing wages per the Federal Prevailing Wage Rate Determination as provided in Exhibit B or pursuant to California law (8 CCR § 16001) where California prevailing wage rates are higher than the applicable federal rate.
IN WITNESS WHEREOF, the Parties have caused this Contract to be executed as of the Contract Date.
CITY OF VISTA, a chartered municipal
corporation
By:
JOHN B. FRANKLIN, MAYOR
ATTEST:
KATHY VALDEZ, CITY CLERK
By:
APPROVED AS TO FORM:
WALTER CHUNG, CITY ATTORNEY
By:
RISK MANAGEMENT REVIEW:
ANALISA HOLBROOK, RISK MANAGER
By:
RAC CONSTRUCTION & ENGINEERING,
INC., a California corporation
By:
Name/Title
By:
Name/Title
APPROVED
Amanda L. Guy
20260710093626
08/11/2026 C11 82 of 436
The 2026 CDBG Sidewalk Project, N Indiana Ave Sidewalk Improvements. (C.I.P. No. 8402B) is a Federally funded project (Community Development Block Grant, CDBG) that requires the prevailing wages to be fixed 10 days prior to the bid opening. Attached are the prevailing wages to use for this project.
08/11/2026 C11 83 of 436
ADDENDUM NO. 1
N Indiana Ave Sidewalk Improvements
2. Working Days
Increase Working Day requirement from twenty-five (25) to Forty (40) within the contract documents:
Bid Documents: Part 1 Section 6 (Page 6) Modify the second sentence (bolded) in the paragraph to:
“The Engineer’s Opinion of Probable Construction Cost for this Project is two hundred thousand dollars ($200,000). All Work shall be completed in every detail to the satisfaction of the Agency within Forty (40) Working Days”
END OF ADDENDUM
08/11/2026 C11 84 of 436
08/11/2026 C11 85 of 436
08/11/2026 C11 86 of 436
08/11/2026 C11 87 of 436
08/11/2026 C11 88 of 436
08/11/2026 C11 89 of 436
08/11/2026 C11 90 of 436
08/11/2026 C11 91 of 436
08/11/2026 C11 92 of 436
08/11/2026 C11 93 of 436
08/11/2026 C11 94 of 436
08/11/2026 C11 95 of 436
08/11/2026 C11 96 of 436
08/11/2026 C11 97 of 436
08/11/2026 C11 98 of 436
08/11/2026 C11 99 of 436
08/11/2026 C11 100 of 436
08/11/2026 C11 101 of 436
08/11/2026 C11 102 of 436
08/11/2026 C11 103 of 436
08/11/2026 C11 104 of 436
08/11/2026 C11 105 of 436
08/11/2026 C11 106 of 436
08/11/2026 C11 107 of 436
08/11/2026 C11 108 of 436
08/11/2026 C11 109 of 436
08/11/2026 C11 110 of 436
CITY OF VISTA ENGINEERING DEPARTMENT
PROJECT SPECIFICATIONS FOR
NORTH INDIANA AVENUE SIDEWALK PROJEC
(C.I.P. No. 8402B)
JUNE 2026
THIS IS A FEDERALLY FUNDED PROJECT
Community Development Block Grant (CDBG)
FEDERAL & STATE LABOR COMPLIANCE APPLY
CFDA No. 14.218
Grant Number: #B-25-MC-06-0575
08/11/2026 C11 111 of 436
08/11/2026 C11 112 of 436
1 PROJECT SPECIFICATIONS FOR
NORTH INDIANA AVENUE SIDEWALK IMPROVEMENTS (C.I.P. No. 8402B) N. INDIANA AVE (THE CIRCLE TO WASHINGTON STREET)
TABLE OF CONTENTS
BIDDING AND CONTRACTUAL DOCUMENTS PAGE
Notice Inviting Bids ........................................................................................................ 3
Instructions to Bidders .................................................................................................. 6
Proposal Forms
Bid Proposal ...................................................................................................... 27 Bid Schedule ..................................................................................................... 31 Contractor’s Licensing Statement ................................................................... 38 Project References ........................................................................................... 39 Contractor’s List of Subcontractors................................................................. 40 Non-Collusion Declaration (Bidder) .................................................................. 41 Contractor’s Certification on Federal Contract Requirements…………….…… 42 Certification Regarding Debarment, Suspension, Proposed Debarment, and Other Responsibility Matters …………….……….……….… 43 Disclosure of Lobbying Activities and Instructions for Completion of SF-LLL, Disclosure of Lobbying Activities ………………………………………45 Equal Employment Opportunity Certification ................................................... 47 Non-Segregated Facilities Certification ............................................................ 48 Non-Lobbying Certification for Federal-Aid Contracts ...................................... 49 Non-Collusion Declaration (Federal Form) ...................................................... 50 Bid Security Form ............................................................................................. 51 Bid Bond ……………………………………………………………………………………………… 53
Agreement and Bonds
Construction Contract……………………………………………………………………….……55
Faithful Performance Bond .............................................................................. 58 Payment Bond .................................................................................................. 61 Contractor's Certificate .................................................................................... 63 Non-Collusion Declaration for Subcontractors ............................................... 64
SPECIAL PROVISIONS
Supplementary General Provisions........................................................................ 65 Supplementary Technical Provisions ..................................................................... 128 08/11/2026 C11 113 of 436
2 APPENDICES
Appendix A: Federal Requirements for Federal CDBG Construction Projects (Exhibit A to the Contract)
Appendix B: Federal Labor Standards Provisions and Federal Prevailing Wage Rates (Exhibit B to the Contract)
Appendix C: Federal Requirements and Special Provisions Appendix D: City of Vista Engineering Construction Survey Request Instructions and Form
Appendix E: City of Vista Stormwater Management Permit Application Form & Reference Information
Appendix F: Potential Staging and Storage Area Exhibits Appendix G: City of Vista Standard Drawings, Pacific Geosource Forta-Fi Fibers and Ace XP Polymer Fiber
Appendix H: San Diego Regional Standard Drawings
Appendix I: Sample Public Notification Documents
Appendix J: Project Sign Layout Example
Appendix K: City of Vista Encroachment Permit
PLANS
NORTH INDIANA AVENUE SIDEWALK IMPROVEMENTS – CIP 8402B, D-4746 (per separate document)
08/11/2026 C11 114 of 436
3 PART I
BIDDING AND CONTRACTUAL DOCUMENTS
NOTICE INVITING BIDS
PUBLIC NOTICE IS HEREBY GIVEN that sealed bids will be received by the City Clerk of the chartered City of Vista (“Agency”) for furnishing all plant, labor, services, materials, tools, equipment, supplies, transportation, utilities and all other items and facilities necessary therefore, as provided in the Contract Documents, for the “NORTH INDIANA AVENUE SIDEWALK IMPROVEMENTS (C.I.P. No. 8402B)” in strict accordance with the Project Specifications and Plans on file in the City of Vista Engineering Department.
1. DATE OF OPENING BIDS
All Bidders are required to submit their bid electronically through the City’s Electronic Bidding System (OpenGov Procurement). Hardcopy bids will not be accepted. Bidders must register by creating a free account with OpenGov Procurement at: https://secure.procurenow.com/signup .
Registered bidders may obtain bid materials and view submission procedures at:
https://secure.procurenow.com/portal/cityofvista . Bidders must also download this bid solicitation to appear on the Bidder’s List as a “Prospective Bidder,” receive addenda, and submit a bid. Bids shall be submitted electronically no later than 2:00 PM (on the dot) on Thursday June 25, 2025.
Immediately after the bid submission deadline, bids will be unsealed and posted at:
https://secure.procurenow.com/portal/cityofvista . OpenGov Procurement will determine the official time for the advertised bid opening and such determination will be final. Bid Tabulation results will be available through OpenGov Procurement
Any bids not received in a timely manner on the Bid Opening Date, as described above, will not be considered.
Note: The City of Vista complies with the Americas with Disabilities Act. If you require reasonable accommodations for the bid opening, please contact the Office of the City Clerk, 760-639-6125, at least forty-eight (48) hours prior to the bid opening.
2. DESCRIPTION OF WORK
The Work generally consists of: stormwater pollution prevention and erosion control, demolition and removal/disposal, traffic control and construction staging, clearing and grubbing, site grading and subgrade preparation, aggregate base, PCC curb & gutter, PCC and AC driveway, PCC sidewalk, signing and striping, private property removals and returns, and other related work. The project improvements are shown on the plans D-4746, LD26-041 included in the bid package.
3. LOCATION OF WORK
08/11/2026 C11 115 of 436
4 The Work to be constructed is located on the East side of North Indiana Avenue from East Orange Street (at The Circle) to E Washington Street, along the frontage of 302 to 332 North Indiana Avenue in the City of Vista, California.
4. CONTRACT DOCUMENTS
Contract documents are available electronically on the City’s OpenGov Procurement portal at:
https://secure.procurenow.com/portal/cityofvista .
5. CONTRACTOR'S LICENSE CLASSIFICATION
In accordance with the provisions of the California Public Contract Code Section 3300, the Agency has determined that the Contractor shall be required to possess a valid California Class A General Engineering Contractor License at the time that the Contract is awarded, and shall maintain said license(s) in good standing at all times during performance of the Work.
6. CONSTRUCTION COST OPINION AND TIME OF COMPLETION
The Engineer’s Opinion of Probable Construction Cost for this Project is two hundred thousand dollars ($200,000). All Work shall be completed in every detail to the satisfaction of the Agency within Twenty-five (25) Working Days after the date of the NOTICE TO PROCEED.
7. PRE-BID MEETING
A Pre-Bid Meeting will not be held for this project.
8. PROJECT ADMINISTRATION
All project related questions and requests for clarifications, changes, exceptions, and deviations to the terms and conditions set forth in this solicitation shall be submitted via “Q&A” through the City’s Electronic Bidding System, OpenGov Procurement.
All questions must be submitted through the City’s Electronic Bidding System by the deadline listed in the City’s Electronic Bidding System, or if no deadline is listed, at least five (5) Working Days prior to the date fixed for opening of bids.
9. DAVIS-BACON ACT – MINIMUM WAGES
This is a federally-assisted project and Davis-Bacon (DBRA) requirements will be strictly enforced. Federal Labor Standards provisions HUD-4010 will be incorporated into the successful bidder’s Contract and is attached to this bid packet. Contractors, including all 08/11/2026 C11 116 of 436
08/11/2026 C11 117 of 436
6 INSTRUCTIONS TO BIDDERS
1. SITE REVIEW
Prospective bidders are expected to conduct a site review of the Project prior to submitting a bid.
2. LOCAL CONDITIONS AND BID QUANTITIES
Bidders shall read the Project Specifications and documents, examine the Plans, review available documents, and make their own estimates of the existing facilities and the difficulties that will attend the execution of the Work called for by the proposed Contract including federal, state, and local laws and regulations, local conditions, uncertainty of weather, traffic, soil conditions and all other contingencies.
Since incorporation in 1963 and chartering in 2007, the City of Vista has constructed numerous projects throughout the City. The projects may have led to development of files and records that may materially affect the Contract. All bidders are strongly encouraged to request copies of those records and familiarize themselves with those records.
Bidders shall satisfy themselves by personal examination of the location of the proposed Work, and by such other means as they may choose as to actual conditions and requirements, and as to the accuracy of the quantities stated in the BID SCHEDULE. The submission of a bid shall be conclusive evidence that the bidder has investigated and is satisfied as to the conditions to be encountered, as to the character, quality and scope of work to be performed, as to the quantity of materials to be furnished, and as to the requirements of these Contract Documents.
Information derived from the Plans, Project Specifications, profiles or drawings, maps, other reports, or from the Engineer or his assistants, shall not relieve the bidder of this responsibility, and the interpretation of the data disclosed by borings or other preliminary investigations is not warranted or guaranteed, either expressly or implied, by the Agency. The bidder’s failure or omission to receive or examine any part of the Contract Documents or to visit the site and be familiar with the existing conditions, shall in no way relieve the bidder from obligation with respect to this bid or to the performance of the Work under this Contract.
The quantities of work or material stated in the unit price items of the BID SCHEDULE are supplied only to give an indication of the general scope of the Work. The Agency does not expressly or by implication agree that the actual amount of work or material will correspond therewith, but reserves the right to increase or decrease the amount of any unit price item of the Work by an amount up to and including twenty-five percent (25%) of any bid item(s), or to omit portions of such work as may be deemed necessary or expedient by the Engineer without a change in the unit price.
Bidders shall not, at any time after the submission of a bid, make or have any claim for damages or anticipated profits or loss of profit or otherwise because of any difference between the quantities of work actually done and material furnished and those stated in said unit price items of the BID SCHEDULE.
08/11/2026 C11 118 of 436
7 The Bidder understands that the unit prices and total bid amount set forth by the Bidder in the BID SCHEDULE shall include all appurtenant expenses, premiums, taxes, royalties and fees. The Bidder shall make no reference in the BID SCHEDULE to sales tax, use tax, or any other tax. The Bidder shall make no reference in the BID SCHEDULE to any patent fees or royalties on any patented article or process which may be furnished or used or to any premium for insurance or surety bonds in the Bid. All amounts bid shall be deemed and held to include any such taxes, fees, royalties or premiums which may be applicable.
The Contractor shall pay all license fees and royalties and assume all costs incident to the use in the performance of the Work or the incorporation in the Work of any invention, design, process, project, or device which is the subject of patent rights or copyrights held by others.
The Contractor shall pay all sales, consumer, use and other similar taxes for the Work or portions thereof provided by the Contractor which are legally enacted at the time bids are received by the Agency, whether or not yet effective. The total bid amount shall be deemed to include such taxes and the Contractor shall not be entitled to separate compensation for such taxes.
3. USE OF MINORITY/WOMAN-OWNED BUSINESS ENTERPRISES (MBE/WBE)
The City of Vista hereby notifies all bidders that it will affirmatively ensure that in any Contract entered into pursuant to this advertisement, Minority/Woman-owned Business Enterprises (MBE/WBE) will be afforded full opportunity to submit bids in response to this invitation.
Information about the MBE/WBE Program can be found in the Appendices. The Agency may require the low bidder and sub-contractors to submit any MBE/WBE certifications within four (4) Working Days after bid opening.
Prospective bidders should be particularly aware of pre-bid outreach requirements to prospective MBE/WBE subcontractors and suppliers, as these requirements must be fulfilled prior to bid opening. The Contractor or subcontractor shall not discriminate on the basis of race, color, national origin, religious creed, ancestry, physical handicap, medical condition, marital status, age or sex in the performance of this contract. All bidders shall document and submit Good Faith Effort documentation. If the Good Faith Effort documentation is not submitted or is deemed inadequate, bidders may be considered non-responsive.
4. INTERPRETATION OF PLANS AND PROJECT SPECIFICATIONS
If any person contemplating the submittal of a bid for the proposed Contract is in doubt as to the meaning of any requirement of the Plans or Project Specifications, or he finds any discrepancies in or omissions from the Plans or Project Specifications, they shall submit a written request for an interpretation or correction thereof via “Q&A” through the City’s Electronic Bidding System, OpenGov Procurement.
The written request must be received by the deadline listed in the City’s Electronic Bidding System, or if no deadline is listed, at least five (5) Working Days prior to the date fixed for opening of bids. The person making the request will be responsible for its prompt delivery.
08/11/2026 C11 119 of 436
8 Interpretations or corrections will be made only by ADDENDA to the Project Specifications or by dated revisions of the drawings. Addenda will be sent to registered bidders that have downloaded this solicitation through the City’s Electronic Bidding System.
All addenda so issued shall become part of the Contract Documents. Acknowledgement of receipt of any and all addenda is required in the BID SCHEDULE. Failure of any bidder to receive any addenda shall not relieve such bidder from any obligations imposed by such addenda. The effect of all addenda to the Contract Documents shall be considered in the bid and said addenda shall be acknowledged on the Bid Proposal. Before submitting a bid, each bidder shall inform himself as to whether or not any addenda have been issued. Failure to determine the existence of any addenda, to obtain and review such addenda, or to include in the bid any obligations imposed by such addenda issued may render the bid irregular and may result in its rejection.
5. BIDDERS INTERESTED IN MORE THAN ONE BID
No person, firm or corporation shall make, file or be interested in more than one (1) bid for the same work unless alternative bids are specifically requested. A person, firm or corporation who has submitted a sub-proposal to a bidder, or who has quoted prices of materials to a bidder, is not disqualified from submitting a sub-proposal or quoting prices to other bidders.
6. FORM OF BID AND SIGNATURE
The bids shall be made on the Bid forms provided through the City’s Electronic Bidding System.
These documents shall constitute the bid. The bid shall be submitted electronically for this solicitation on the City’s OpenGov Procurement portal at:
https://secure.procurenow.com/portal/cityofvista . Bidders must also mail their bid security or original bidder’s bond with a postmarked date no later than the Bid Date as described in Section 11 Bid Security / Return of Bid Securities below.
The Bid for the Work is intended to establish a total cost for the Work in its entirety. The Bidder shall state in the Bid the unit prices or Lump Sums for which he proposes to supply the labor, materials, supplies and equipment necessary to complete the Work required by the Contract Documents. Certain permit requirements, General Provisions, Supplementary General Provisions, and other work required by the Plans and/or the Specifications may not be listed in the Bid Schedule and are, in general, applicable to more than one listed Bid Item. Other required work may not be listed as a separate item in the Bid Schedule, but is necessary to complete the Work described in the Plans and/or the Project Specifications. The Bidder shall include the cost of all work not listed as a separate item in the Bid Schedule in the various related items of work listed in the Bid Schedule, so that the Bid for the Project reflects the total cost for completing the Work in its entirety.
If the proposal is made by an individual, it shall be signed and his full name and address shall be given; if it is made by a firm, it shall be signed with the partnership name by a member of the firm, who shall also sign his own name, and the name and address of each member shall be given; and if it is made by a corporation, the name of the corporation shall be signed by its duly 08/11/2026 C11 120 of 436
9 authorized officer or officers attested by the corporate seal, and the names and titles of all officers of the corporation shall be given.
7. PREPARATION OF THE BID / REJECTION OF THE BID
The Bid shall be prepared such that it is complete and responsive to all requirements of the Contract Documents. The completed Bid shall consist of the following forms:
a) Bid Proposal – (reminder to acknowledge receipt of addenda #8, and initial #9, page 27) b) Bid Schedule (to be completed through the City’s Electronic Bidding System, OpenGov.) c) Description of Bid Items (copy, include and upload with bid package, pages 34-37) d) Contractor’s Licensing Statement (page 38)
e) Project References (page 39)
f) Contractor’s List of Subcontractors – (reminder to initial one of the 2 options at bottom if applicable on page 45)
g) Non-Collusion Declaration (Federal Form - page 41)
h) Contractor’s Certification on Federal Contract Requirements (page 42) i) Certification Regarding Debarment, Suspension, Proposed Debarment, and Other Responsibility Matters (page 43-44)
j) Disclosure of Lobbying Activities and Instructions for Completion of SF-LLL, Disclosure of Lobbying Activities (page 45)
k) Equal Employment Opportunity Certification (page 47) l) Non-Segregated Facilities Certification (page 48)
m) Non-Lobbying Certification for Federal-Aid Contracts (page 49) n) Non-Collusion Declaration (Federal Form - page 50)
o) Bid Security Form (with bid bond, cash, certified check or cashier’s check included). Scan, upload and mail according to page 15-16. Forms on page 51-58.+ p) Non-Collusion Declaration for Subcontractors (Federal Form - page 64)
Registered bidders may obtain the Contract Documents through the City’s Electronic Bidding System. If any bid forms are missing from the Contract Documents obtained by the Bidder, directly from OpenGov Procurement or through other means, it shall be the Bidder's responsibility to contact the Agency and obtain all required Bid Document forms prior to submitting a bid.
Blank spaces in the Bid shall be properly filled in (using figures in the Bid Schedule). The Bid shall contain an acknowledgment of receipt of all addenda.
The phraseology of the Bid must not be changed, and no addition shall be made to the items mentioned therein. Alternative bids shall not be considered unless specifically requested and authorized by the Agency.
The Bid shall be signed in accordance with the “Instructions for Signing Bids, Bonds, and Contracts”, included in the Contract Documents, and as required by the City’s Electronic Bidding System.
.
The bidder shall set forth for each unit basis item of work a unit price and a total for the item, and for each lump sum item a total for the item, all in clearly legible figures in the respective 08/11/2026 C11 121 of 436
10 spaces provided for that purpose. In the case of unit basis items, the amount set forth under the "Item Total" column shall be the product of the unit price bid and the estimated quantity for the item. Unit prices shall not exceed two (2) decimal places.
All extensions of the unit prices bid and sums will be subject to verification by the Agency. If the unit prices entered by the Bidder exceed two (2) decimal places, the Agency will only use the first two (2) digits after the decimal points without rounding up or down.
In case of discrepancy between the unit price and the total set forth for a unit basis item, the unit price shall prevail, except as provided in (a) or (b), as follows:
a) If the amount set forth as a unit price is unreadable or otherwise unclear, or is omitted, or is the same as the amount as the entry in the item total column, then the amount set forth in the item total column for the item shall prevail and shall be divided by the estimated quantity for the item and the price thus obtained shall be the unit price;
b) If the product of the entered unit price and the estimated quantity is exactly off by a factor of ten, one hundred, etc., or one-tenth, or one-hundredth, etc. from the entered total, the discrepancy will be resolved by using the entered unit price or item total, whichever most closely approximates percentage-wise the unit price or item total in the Agency's Final Estimate of cost.
Bids on lump sum items shall be item totals only; if any unit price for a lump sum item is included in a bid and it differs from the item total, the item total shall prevail.
If both the unit price and the item total are unreadable or otherwise unclear, or are omitted, the bid may be deemed irregular. Likewise if the item total for a lump sum item is unreadable or otherwise unclear, or is omitted, the bid may be deemed irregular unless the project being bid has only a single item and a clear, readable total bid is provided.
A Bid shall be considered irregular if certain situations occur, including, but not limited to, the following:
a) The Bid contains blank spaces that are not properly filled in. b) The Bid contains unauthorized provisions, conditions, limitations, or alternatives. c) The Bid is either not typewritten or not printed in ink. d) The Bid contains interlineations, alterations, erasures, clerical errors or is otherwise illegible or unclear, or not properly initialed.
e) The Bid is not properly signed in accordance with the instructions. f) The Bid contains unit prices and/or item totals that are unreadable or otherwise unclear, or are omitted.
g) The Bid contains a significant “material” difference between the bid total written in figures, the bid total written in words, and/or the sum of the item totals after any math errors are corrected.
Bidder’s failure to submit the Bid on time through the City’s Electronic Bidding System, submit a complete Bid using all of the required Bid forms provided in the Contract documents or addenda, include a price for any Bid item that requires the Bidder to submit a price, acknowledge all 08/11/2026 C11 122 of 436
11 addenda, or submit the appropriate Bid Security shall render the Bid non-responsive and shall be cause for its rejection.
In accordance with the provisions of Section 1771.1(b) of the California Labor Code – the Agency will not accept bid or enter into a Contract without proof of the contractor’s current registration with the California Department of Industrial Relations pursuant to Section 1725.5.
The Agency, in its sole discretion, reserves the right to reject any or all bids, and to waive any informalities or minor irregularities in the Bids, unless waiving such irregularity would give a competitive advantage to a Bidder.
8. ALTERNATIVE SCHEDULES
Bidders are directed to review the BID SCHEDULE and the appendices for details regarding the alternate bid items, if included.
The Agency will evaluate the bids based on the total amount of the Base Bid Items, and will not include the Alternate Bid Item(s) in determining the lowest responsible bidder. The Agency reserves the right to award the Contract on the Base Bid Items, and with or without any or all of the Alternate Bid Item(s). The Agency reserves the right to adjust the quantity of the Alternate Bid Item(s) after the award of contract.
9. LIST OF SUBCONTRACTORS FILED WITH BID
In accordance with the provisions of Sections 4100 through 4113, inclusive, of the Public Contract Code of the State of California (“Subletting and Subcontracting Fair Practices Act”), each bidder shall submit with his bid the name, location of place of business, and Contractor’s License Number of each proposed subcontractor who will perform work or labor or render service to the principal Contractor in an amount in excess of one-half of one percent (0.5%) of the principal Contractor's bid, or in the case of the construction of streets or highways, in excess of one-half of one percent (0.5%) or ten thousand dollars ($10,000), whichever is greater, and shall state the portion and dollar value of the Work which will be done by each such subcontractor in the List of Subcontractors form. If no subcontractor is listed for a portion of the Work, then the Contractor is required to perform that portion with his own forces.
An inadvertent error in listing the subcontractor’s license number shall not be grounds for filing a bid protest, or grounds for considering the bid nonresponsive, if the corrected contractor’s license number is submitted to the public entity by the prime contractor within 24 hours after the bid opening, provided that the corrected license number corresponds to the submitted name and location of the subcontractor.
Pursuant to Section 1725.5 of the Labor Code of the State of California, no contractor may be awarded a public works contract and no subcontractor of any tier may work on a public works project without proof of registration with the Department of Industrial Relations. To comply with these regulations, each bidder being considered for award of the Contract shall submit to the Agency the names and PWC Registration Number of each proposed subcontractor of any tier 08/11/2026 C11 123 of 436
12 who will perform work or labor or render service to the principal Contractor in any amount within 7 days after the bid opening date. The inadvertent listing on the bid documents of a subcontractor that is not registered with the California Department of Industrial Relations will not necessarily invalidate the bid. An unregistered subcontractor can be replaced with one who is registered.
10. NON-COLLUSION DECLARATIONS
The bidder is required to execute a Non-Collusion Declaration in the form attached hereto, and submit the form with the bid. The Agency reserves the right to require, before awarding the contract, that the principal Contractor secure from each proposed subcontractor a Non-Collusion Declaration in the form also attached hereto, and submit all forms to the Agency.
If at any time it shall be found that the person, firm or corporation to whom the Contract has been awarded has, in presenting any bid or bids, colluded with any other party or parties, then the Contract so awarded shall be null and void, and the Contractor and the Contractor’s sureties shall be liable to the Agency for all loss or damage which the Agency may suffer thereby, and the Agency may advertise anew for bids for such work.
11. ADDITIONAL FORMS FOR FEDERALLY-FUNDED PROJECTS
For Federally-funded projects, the bidder is required to complete and execute the Equal Employment Opportunity Certification, the Non-Lobbying Certification for Federal-Aid Contracts, the Disclosure of Lobbying Activities (if required), the Debarment and Suspension Certification, EXHIBIT 15-G LOCAL AGENCY BIDDER DBE COMMITMENT, AND EXHIBIT 15-H DBE INFORMATION – GOOD FAITH EFFORT, in the form attached hereto, and submit the forms with the bid.
This project is being financed with Community Development Block Grant (CDBG) funds (24 CFR Part 570) from the U.S. Department of Housing and Urban Development (HUD). All contracts using this federal funding are subject to certain Special Federal Provisions and additional Federal Requirements;, including but not limited to: HUD Federal Labor Standards Provisions (HUD 4010); Davis-Bacon Prevailing Wages; Section 3 Economic Opportunities Requirements (24 CFR Part 75); and Executive Order #11246. Information pertaining to federal CDBG construction Contract requirements are included in this Invitation for Bids and Project Specifications for this Project. Bidders are required to review and comply with all federal requirements.
For Federally-funded projects, the bidder is required to complete and execute the following Certifications and Forms, in the form attached hereto, and submit the forms with the bid:
NOTE: Any bid that does not include the forms listed above, completed and signed, along with all other required forms in the bid submittal, may be considered non- responsive.
REGARDING SECTION 3 OF THE HOUSING AND URBAN DEVELOPMENT ACT OF 1968, this project requires to the greatest extent feasible, under Section 3 of the HUD Act 08/11/2026 C11 124 of 436
13 of 1968, that opportunities for training and employment be given to low-income residents and businesses in the project area. A Section 3 Compliance Guide and Section 3 Contract Clauses are provided in the Project Specifications.
The bidder is cautioned that making a false certification may subject the bidder to criminal prosecution. If at any time it shall be found that the person, firm or corporation to whom the Contract has been awarded has, in presenting any bid or bids, has provided false information, then the Contract so awarded shall be null and void, and the Contractor and the Contractor’s sureties shall be liable to the Agency for all loss or damage which the Agency may suffer thereby, and the Agency may advertise anew for bids for such work.
The purpose of Section 3 of the Housing and Urban Development Act of 1968 (12 U.S.C. 1701u) (Section 3) is to ensure that employment and other economic opportunities generated by certain HUD financial assistance shall, to the greatest extend feasible, and consistent with existing Federal State, and local laws and regulations, be directed to low and very-low income individuals, especially recipients of government assistance for housing, and to business concerns which provide economic opportunities to low and very low income individuals. (Section 3 means section 3 of the Housing and Urban Development Act of 1968, as amended 12 U.S.C. 1701u).
Section 3 requirements apply to all contractors and subcontractors performing work in connection with projects and activities funded by public housing assistance covered by Section 3, regardless of the amount of the contract or subcontract. Section 3 covered contracts do not include contracts for the purchase of supplies and materials unless the contract includes the installation of the materials.
A business concern seeking to qualify for a Section 3 contracting preference shall certify or submit evidence that the business concern qualifies as a Section 3-business concern. (Refer to What Is A Section 3 Business Concern?). The Section 3 business must also be able to demonstrate its ability to complete the contract. The ability to perform successfully under the terms and conditions of the proposed contract is required of all contractors and subcontractors subject to the procurement standards of 24 CFR 85.36, 24 CFR 85.36b(8).
Contractors who do not qualify as Section 3 business concerns, but who enter into contracts with the City of Vista, must agree to comply with certain general conditions (refer to Section 3 Clause).
All contractors and subcontractors, including Section 3 businesses, must comply with these general conditions. Included in these conditions is the requirement that each contractor and subcontractor submit with each pay request a report of Section 3 compliance (refer to Section 3 Compliance Report). Failure to comply with these general conditions may lead to sanctions which can include termination of the contract for default and suspension or debarment from future HUD-assisted contracts (refer to Sanctions for Contractor’s Noncompliance).
More information and requirements for Federal-Aid Construction Projects are included in the Appendices to these Specifications, and are applicable to this Contract.
12. BID SECURITY / RETURN OF BID SECURITIES
08/11/2026 C11 125 of 436
14 Each bidder shall submit with his bid an unconditional certified or cashier's check drawn on a solvent state or national bank, or a bidder's bond with a responsible corporate surety, on the form attached hereto, subject to the provisions for “Bonds” herein. Unless otherwise stated in the Contract Documents, said bid security or bidder's bond shall be in a sum at least ten percent (10%) of the total base bid amount, and shall be made payable to the Agency as a guaranty that the bidder will, if an award is made, in accordance with the terms of his bid, promptly execute a Contract in the required form, secure payment of Workmen's Compensation, and furnish satisfactory Performance Bond, Payment Bond, and certificates of insurance, and endorsements within ten (10) Working Days following the posting of the Notice of Intent to Award a contract.
Notice of instructions to Principal and Surety regarding completion of Bidder’s Bond:
1) Principal’s signature with title must be properly notarized (i.e., proprietorship, partnership, corporation, joint venture). If corporation, affix seal; 2) Signature of Attorney-in-Fact for Surety must be properly notarized; 3) Attach certified copy of Power of Attorney for Surety’s Attorney-in-Fact; and 4) If bond is executed in excess of surety company’s treasury limit, evidence of how bond was reinsured must be attached over signature of Attorney-in-Fact.
Bidders must scan and upload a copy of their bid security or bidder’s bond with their electronic bid submittal in OpenGov Procurement.
Bidders must also mail their bid security or original bidder’s bond with a postmarked date no later than the Bid Date, to the following address:
ATTN: DANIEL CARNS, PE
City of Vista Engineering Department
200 Civic Center Drive
Vista, CA 92084
If a bidder to whom an award is made fails or refuses to execute the Contract, secure the payment of Worker's Compensation and furnish the required bonds and proof of insurance, all within the time stated in the provisions for “Execution of Contract / FAILURE TO EXECUTE CONTRACT” herein, the money represented by said check or bidder's bond shall become and remain the property of the Agency, the amount thereof being agreed to by the bidder as liquidated damages due the Agency on account of the delay in the execution of the Performance Bond, Payment Bond, and proof of insurance coverage, and in the performance of work thereunder, resulting from such failure or refusal.
The Agency reserves the right to retain the bid security of the three (3) apparent lowest responsible Bidders until the Contract Documents have been formally executed by the successful Bidder and the Agency, and the successful Bidder has filed with the Agency the Faithful Performance Bond, the Contractor’s Payment Bond, and the insurance policies or certificates required by the Bid Documents, after which such bid securities will be returned to the respective Bidders whose bids they have accompanied.
13. PROJECT REFERENCES
08/11/2026 C11 126 of 436
15 All bidders shall provide evidence satisfactory to the Agency that the bidder has prior experience to properly perform in accordance with the terms of these Plans and Specifications by completing and submitting the PROJECT REFERENCES spreadsheet with his bid. The PROJECT REFERENCES list shall include projects successfully performed by the Bidder of comparable magnitude that he or his associates are personally competent to manage the proposed undertaking, and to carry it forward to a successful conclusion.
14. LICENSE REQUIREMENTS
All prospective contractors submitting a bid shall have the appropriate license as required by these specifications. Failure to possess the specified license at the time of award shall render the bid as non-responsive and shall act as an absolute bar to award the Contract to any bidder not possessing said license at the time of award. Any Contract awarded to a contractor who was not properly licensed at the time of award or at any time during the Contract period shall be void pursuant to Section 7028.15 of the Business and Professions Code. The Agency shall verify that a contractor is properly licensed prior to the award of the Contract as part of determining the lowest responsible and responsive bidder.
15. CONTRACTOR'S REQUIRED SHARE OF CONTRACT WORK
In accordance with Subsection 3-2, SELF-PERFORMACE of the Standard Specifications for Public Works Construction, the Contractor shall perform, with its own personnel from within its organization, Contract work amounting to at least fifty percent (50%) of the Contract Price, except that any designated "Specialty Items" may be performed by subcontract and the amount of any such "Specialty Items" so performed may be deducted from the Contract Price before computing the amount of work required to be performed by the Contractor with its own personnel [i.e. the percentage of work which will not be performed by a Bidder’s own forces will be determined by (1) adding the dollar value of all contracts shown on the list of subcontractors (excluding the dollar amount of any specialty items), then (2) dividing such total by the Bidder’s Total Bid Amount (excluding the dollar amount of specialty bid items)].
Specialty Items shall be as listed in Subsection 3-2 (“SELF-PERFORMACE.”) of the latest edition of the San Diego Regional Supplement of the Standard Specifications for Public Works Construction (“Greenbook”) and as identified with an “S” in the Bid Item Number column of the BID SCHEDULE.
16. ANNUAL PUBLIC WORKS BIDDER REGISTRATION (SB 854)
In accordance with the provisions of California Senate Bill 854, passed by the California State Senate on June 20, 2014, all contractors and subcontractors bidding and performing work on Public Works Projects must register on an annual basis with the California Department of Industrial Relations (DIR) and furnish electronic payroll records to the Labor Commissioner’s Office.
08/11/2026 C11 127 of 436
16 In accordance with the provisions of Section 1771.1(a) of the California Labor Code, a contractor or subcontractor shall not be qualified to bid on, be listed in a bid proposal, subject to the requirements of Section 4104 of the Public Contract Code, or engage in the performance of any Contract for public work, as defined in this chapter, unless currently registered and qualified to perform public work pursuant to Section 1725.5. It is not a violation of this section for an unregistered contractor to submit a bid that is authorized by Section 7029.1 of the Business and Professions Code or by Section 10164 or 20103.5 of the Public Contract Code, provided the contractor is registered to perform public work pursuant to Section 1725.5 at the time the Contract is awarded. Prime contractors and their subcontractors must possess and maintain such registration with DIR in order to be awarded contracts and to perform work.
The Agency will verify that the contractors or subcontractors that bid on, or are listed in the bid proposal of, this Contract are currently registered and qualified to perform public work pursuant to Section 1725.5 in the State of California through the following URL website link at:
https://services.dir.ca.gov/gsp?id=dir_contractors&table=x_cdoi2_letf_core_contracto r_lookup
In accordance with the provisions of Section 1771.1(a) of the California Labor Code – the Agency will not accept a bid or enter into a Contract without proof of the contractor’s current registration to perform public works pursuant to Section 1725.5.
In accordance with the provisions of Section 1773.3 of the California Labor Code, the Agency will provide notice to the Department of Industrial Relations of any public works Contract within thirty (30) days of the award, but in no event later than the first day in which a contractor has workers employed upon the public work, using the online PWC-100 “Extract of Public Works Contract Award” form, which can be found at:.
https://www.dir.ca.gov/pwc100ext/LoginPage.aspx
The online PWC-100 form is also transmitted to the Department of Apprenticeship Standards (DAS) to inform them of the award of a contract.
17. MODIFICATION AND WITHDRAWAL OF THE BID
Any Bidder may modify his prior to the scheduled closing time for receipt of bids by submitting an amended bid through the City’s Electronic Bidding System.
A bidder may withdraw his bid before the hour fixed for opening bids, without prejudice to himself, by cancelling their bid submission through the City’s Electronic Bidding System. No proposal may be withdrawn after the hour fixed for opening bids without rendering the accompanying certified or cashier's check or bidder's bond subject to forfeiture as liquidated damages in like manner as in the case of failure to execute the Contract after award, as hereinafter provided.
08/11/2026 C11 128 of 436
17 After the bids have been publicly opened, they shall not be withdrawn by the Bidders for a period of at least ninety (90) calendar days subject to the execution stated in the paragraph below. The ninety (90) calendar day review period may be extended by the Agency and written approval by the Bidder.
A Bidder shall be permitted to withdraw a bid after the opening of the bids only if the Bidder established to the satisfaction of the Agency ALL of the following:
a) A clerical error was made by the Bidder in filling out the bid; and the error was not due to:
1) an error in judgment;
2) an error in inspecting the site of the Work, or;
3) an error in reading the Plans and Contract Documents. b) The clerical error made the bid materially different than the Bidder intended the bid to be. c) The Bidder gave the Agency written notice within five (5) Working Days excluding Saturdays, Sundays, and State holidays, after the opening of the bids, in which said notice specifies in detail the nature of the error and how the error was made per Public Contract Code 5103(b).
18. (INTENTIONALLY LEFT BLANK)
19. PUBLIC OPENING OF BIDS
No bid received after the time named or at any place other than the place stated in the Notice Inviting Bids shall be considered. Immediately after the bid submission deadline, bids will be unsealed and posted at: https://secure.procurenow.com/portal/cityofvista . OpenGov Procurement will determine the official time for the advertised bid opening and such determination will be final. Bid Tabulation results will be available through OpenGov Procurement.
After the bids are publicly opened, the Agency shall review all bids for responsiveness, compare the bids to the Engineer’s Opinion of Probable Cost and investigate the responsibility and qualifications of all Bidders to whom the award is contemplated, for a period not to exceed ninety (90) calendar days after the Bids have been opened. Based on the findings from the review of the Bids, the Agency will provide a Notice of Intent to Award a contract to all bidders.
Following the posting of the Notice of Intent to Award a contract, anyone interested in inspecting bid documents in person or receiving electronic copies shall make a request to the City Engineer following the posting of the Notice of Intent to Award a contract. Bid documents will be sent electronically, and appointments for inspection of the bid documents will be scheduled to occur, within five (5) Working Days after the request is received by the Agency.
20. DISQUALIFICATION OF BIDDERS
Any one or more of the following causes may be considered as sufficient for the disqualification of Bidder and the rejection of the Bidder’s bid or bids:
08/11/2026 C11 129 of 436
18 a) Submittal of more than one (1) bid for the same work from an individual firm, partnership, or corporation under the same or different names.
b) Evidence of collusion among Bidders.
c) Modification of BID SCHEDULE.
d) Submittal of an incomplete or invalid bid, and / or failure to include all required information, which precludes full analysis and review of said Bid and / or which precludes meaningful comparison of the Bid with other bids received by the Agency.
21. BID PROTESTS
Any bidder who submits a valid bid shall have the right to file a bid protest with the Agency before 5:00 p.m. on the fifth Working Day following the posting date of the Notice of Intent to Award a contract. However, bidder shall receive an extension to this deadline if the Agency has not fulfilled bidder’s request for electronic copies of the bid documents or for an opportunity to inspect the bid documents at least two (2) Working Days prior to the deadline. In such cases, bidder may submit a bid protest before 5:00 p.m. on the fifth Working Day following the date on which bidder receives, or is provided an opportunity to inspect, the bid documents. Bid protests must be submitted in writing to the City Engineer of the City of Vista, City of Vista Civic Center, Engineering Department, 200 Civic Center Drive, Vista, California 92084-6275. The time limits and requirements set forth in this section are mandatory, and are the bidder’s sole and exclusive remedy in the event of a bid protest, and failure to comply with these requirements shall constitute a waiver of any right to further pursue the bid protest, including filing a Government Code Claim or legal proceedings. If a protest is received from anyone other than a bidder, or after the specified time period, the protest shall be invalid. The protest shall conform to the following requirements:
a) The initial protest document shall contain a complete statement of the basis for the protest. b) The protest shall refer to the specific portion, or portions, of the document that form the basis for the protest.
c) The protest shall contain the name, address, and telephone number of the person representing the protesting party.
d) The party filing the protest shall concurrently transmit a copy of the initial protest document, and any attached documentation, to all other parties with a direct financial interest that may be adversely affected by the outcome of the protest. Such parties shall include all other bidders or proposers who appear to have a reasonable prospect of receiving an award depending upon the outcome of the protest.
e) The Agency shall issue a decision on the protest.
22. AWARD OF CONTRACT
No bidder may withdraw its bid for a period of ninety (90) calendar days.
The Contract shall be awarded within ninety (90) calendar days after the opening of bids, if it is in the interest of the Agency to do so. The Agency reserves the right to waive any informality or minor irregularities in any bid, to reject any or all bids, to reject one part of a bid and accept the other, except, to the extent that bids are qualified by specific limitations, to take bids under 08/11/2026 C11 130 of 436
19 advisement for a period of ninety (90) calendar days after the date the bids are publicly opened, and to make award to the lowest responsible bidder as the interest of the Agency may require.
All terms and conditions contained in the Contract Documents shall become a part of the contract.
23. EXECUTION OF CONTRACT / FAILURE TO EXECUTE CONTRACT
A bidder whose proposal is being recommended for acceptance shall execute a written Contract with the Agency, in the form of the CONSTRUCTION CONTRACT attached hereto, prior to contract award and within the time requested by the Agency. Thereafter, a bidder to whom an award is made shall secure the payment of Workmen's Compensation, and furnish good and approved bonds and insurance certificates, all as required in the following paragraph and all in accordance with the provisions hereof, within ten (10) Working Days from the date of the posting of the Notice of Intent to Award a contract, by the Agency to the bidder, according to the address given by him in his proposal.
If a bidder to whom award is made fails or refuses execute the Contract prior to bid award, or to thereafter conform to any of the stipulated requirements in connection therewith, the money represented by his check or bidder's bond shall become the property of the Agency, as provided in the provisions for “Bid Security” herein, any award made will be annulled, and, at the discretion of the Agency, an award may be made to the bidder whose proposal is next most acceptable to the Agency, and such bidder shall fulfill every stipulation embraced herein as if he were the party to whom the first award was made. A corporation whose proposal is being recommended for acceptance may be required, before the Contract is executed, to furnish evidence of its corporate existence, of its right to do business in California, and of the authority of the officer signing the Contract and bonds for the corporation.
24. BONDS
Except as otherwise provided in the Contract Documents, a bidder to whom the Contract is awarded shall, within the time stated in the provisions for “EXECUTION OF CONTRACT / FAILURE TO EXECUTE CONTRACT” herein, furnish a bond with an admitted corporate surety, or corporate sureties conditioned upon the faithful performance of the said bidder of all covenants and stipulations in the Contract. Said bond, hereinafter referred to as the Faithful Performance Bond, shall be in the form approved by the Agency and in the penal sum of at least one hundred percent (100%) of the total base bid amount payable under the Contract secured by two (2) or more sufficient sureties or by a surety company.
Within the time mentioned in the preceding paragraph, the bidder to whom the Contract is awarded shall also furnish a Payment Bond, approved by the Agency, in accordance with the provisions of Civil Code Section 3225-3228, inclusive, and Sections 3247-3252, inclusive.
Unless otherwise specified in the Contract Documents, said Payment Bond shall be in a sum not less than one hundred percent (100%) of the total amount payable by the terms of this Contract, but not less than the sum prescribed by Section 3248 of the Civil Code, in any case.
08/11/2026 C11 131 of 436
20 Each bond shall incorporate, by reference, the Contract, and be signed by both the Contractor and the Surety.
Sureties must:
1) be listed in the latest version of U.S. Department of Treasury Circular 570 at:
https://www.fiscal.treasury.gov/fsreports/ref/suretyBnd/c570_a-z.htm
2) be authorized to issue bonds in California;
3) have bonding limitation shown in said Circular 570 sufficient to provide bonds in the amount required for the contract.
The Agency will verify that the corporate surety or sureties that furnish bonds for this Contract are admitted sureties authorized to provide such services in the State of California through the following URL website link at:
http://www.insurance.ca.gov
The surety or sureties on all bonds furnished must be satisfactory to the Agency. All insurance or surety companies providing insurance or surety bond(s) under the Contract shall be admitted in the State of California to transact the insurance business in the class of the type provided and shall have a general policy holder's rating of "A" or higher and a Financial Class V ($10,000,000) or better as established in the most current A. M. Best's Key Rating Guide or equivalent or greater rating established by another recognized rating entity such as Moody’s; provided however, that for the workers' compensation and employers' liability insurance business and having a general policy holders' rating of "A" or higher and a Financial Class VI or higher in the most current A.M.
Best's Key Rating Guide. The party required to furnish bonds pursuant to these instructions shall furnish such bonds at his cost and expense. The Agency reserves the right to reject any bond if, in the opinion of the Engineer, the surety's acknowledgment is not in the form included in the Contract Documents or in another form substantially as prescribed by law.
Surety companies and insurance companies shall familiarize themselves with all of the conditions and provisions of the contract, and they waive the right of special notification of any change or modification of the Contract or of decreased or increased work or of the cancellation of the contract, or of any other acts by the Agency or its authorized agents, under the terms of the contract. Notwithstanding the provisions of any other contract or agreement, the failure of any surety company or insurance company to receive notification of any of the aforesaid changes shall in no way relieve the surety company or insurance company of its obligations under the contract. Notwithstanding any other provisions of the Contract Documents inconsistent with the provisions of this section, the Contractor shall not be responsible for the cost of repairing or restoring damage to the Work in excess of five percent (5%) of the Contract price caused by an act or acts of God, as defined in Public Contract Code Section 7105, occurring after the Contract for the Work is entered into.
To be approved, the Payment Bond must be in the form provided in these Project Specifications.
08/11/2026 C11 132 of 436
21 Unless a Contractor’s Payment Bond is filed and approved as herein provided, no claim in favor of the Contractor arising under the Contract shall be audited, allowed or paid by the Agency. Any persons named in Section 3181 of the California Civil Code shall receive payment of their respective claims in the manner provided by Chapter 4, Part 4, Division 3, Title 15 of the California civil Code upon having complied with the conditions of Section 3183 of the California Civil Code.
25. NOTIFICATION OF SURETY COMPANIES
The surety companies and other signers of any of the above mentioned bonds and insurance companies, shall familiarize themselves with all of the conditions and provisions of the contract, and they waive the right of special notification of any change or modification of the Contract or of extension of time, or of decreased or increased work, or of the cancellation of the Contract, or of any other act or acts by the Agency or its authorized agents, under the terms of the Contact; and failure to so notify the aforesaid surety companies or insurance companies of changes shall in no way relieve the surety companies of their obligation under the Contract.
26. LIABILITY INSURANCE
Before the Contract is executed on behalf of the Agency, a bidder to whom the Contract has been awarded shall furnish to the Agency a policy or certificate of protective liability insurance in which the Agency shall be named as an additional insured with the bidder. The policy shall insure the Agency, its officers and its employees, the bidder, his employees, and his subcontractors and their employees, and their heirs, agents, and employees, while acting within the scope of their duties, against all claims arising out of or in connection with the Work to be performed, and shall remain in full force and effect until the Work is accepted by the Agency. The policy shall provide for the limits stated with any insurance policy carried by the Agency. The public liability insurance shall be in the amounts set forth in of the Supplementary General Provisions. The insurance company shall meet the financial strength rating requirements set forth in the General Provisions.
27. INSURANCE CODE REQUIREMENTS
Attention is called to the provisions of the Insurance Code of the State of California with reference to the writing of insurance policies and bonds covering risks located in this state, and the premiums and commissions thereon. A bidder to whom the Contract is awarded shall furnish, at the time his bond or bonds are submitted for approval, satisfactory evidence that the requirements of said code have been observed.
28. ASSIGNMENT
In accordance with Section 4552 of the Government Code, the bidder shall conform to the following requirements. In submitting a bid to the Agency, the bidder offers and agrees that if the bid is accepted, it will assign to the Agency all rights, title and interest in and to all causes of 08/11/2026 C11 133 of 436
22 action it may have under Section 4 of the Clayton Act (15 U.S.C. Section 15) or under the Cartwright Act [Chapter 2 (commencing with Section 16700) of Part 2 of Division 7 of the Business and Professions Code], arising from purchases of goods, services or materials by the Bidder for sale to the purchasing body pursuant to the bid. Such assignment shall be made and become effective at the time the purchasing body tenders final payment to the bidder.
29. WAGE RATES
Pursuant to the Vista City Charter and the Vista Municipal Code, payment of prevailing wages and compliance with the California Labor Code Sections 1770 et seq IS required for this Project.
On Federally-funded projects, if there is a difference between the minimum wage rates predetermined by the Secretary of Labor and the general prevailing wage rates determined by the Director of the California Department of Industrial Relations for similar classifications of labor, the Contractor and subcontractors shall not pay less than the higher wage rate. The Supplementary General Conditions contain additional information regarding State and Federal prevailing wages.
This Project is funded with federal grant funds. Within ten (10) calendar days before the bid opening an addendum will be issued containing the latest Federal prevailing wage rate determinations to be used for the Project. More information and requirements are stated in Form FHWA 1273 titled “Federal Requirements for Federal-Aid Construction Projects”, included in the Specifications.
DAVIS-BACON ACT – This is a federally-assisted project and Davis-Bacon (DBRA) requirements will be strictly enforced. Federal Labor Standards provisions HUD-4010 will be incorporated into the successful bidder’s Contract and is attached hereto to this bid packet. Contractors, including all subcontractors and apprentices, must be eligible to participate. Bidders shall download, if applicable, an updated Wage Decision 10 days prior to Bid Opening, which will be applicable to the contract. Within ten (10) calendar days before the bid opening an addendum will be issued containing the latest Federal prevailing wage rate determinations to be used for the Project.
30. SUBSTITUTION OF SECURITIES IN LIEU OF RETENTION
The Contractor may elect to receive one hundred percent (100%) of payments due under the Contract Documents from time to time, without retention from any portion of the payment by the Agency, if the Contractor deposits securities of equivalent value with the Agency in accordance with the provisions of Section 22300 of the California Public Contract Code. Such securities, if deposited by the Contractor, shall be valued by the Agency, whose decision on valuation of the securities shall be final. Securities eligible for investment under this provision shall be limited to those listed in Section and 16430 of the California Government Code.
31. PROMPT PAYMENT OF SUBCONTRACTOR(S) PROVISIONS
08/11/2026 C11 134 of 436
23 The Contractor shall pay each subcontractor under this Contract for satisfactory performance of its Contract no later than ten (10) Working Days from receipt by the Contractor of payment from the Agency. As required by Public Contract Code Section 7107, the Contractor shall release all retention owed to subcontractors for satisfactory completion of accepted work within seven (7) calendar days (thirty (30) calendar days per Federal Code of Regulations 49CFR26.29 for federally funded projects) after receipt of retention from the Agency.
32. USE OF UNITED STATES FLAG VESSELS
The CONTRACTOR agrees-
1. To utilize privately owned United States-flag commercial vessels to ship at least 50 percent of the gross tonnage (computed separately for dry bulk carries, dry cargo liners, and tankers) involved, whenever shipping any equipment, material, or commodities pursuant to this contract, to the extent such vessels are available at fair and reasonable rates for United States-flag commercial vessels.
2. To Furnish within 20 days following the date of loading for shipments originating within the United State or within 30 working days following the date of loading for shipments originating outside the United States, a legible copy of a rated “on-board” commercial ocean bill-of- lading in English for each shipment of cargo described in paragraph (1) of this section to both the Contracting Officer (through the prime contractor in the case of subcontractor bills- of-lading) and to the Division of National Cargo, Office of Market Development, Maritime Administration, Washington, DC 20590.
3. To insert the substance of the provisions of this clause in all subcontracts issued pursuant to this contract.
Maintain records and submit reports documenting your performance under this section.
33. COPELAND ACT ANTI-KICK BACK REQUIREMENTS
This project requires the enforcement of the Copeland Anti-Kick Back Act (18 USC 874) and Department of Labor regulations (29CFR, Part 3), which require that each contractor or subcontractor shall be prohibited from inducing, by any means, any person employed in the construction, completion, or repair of public work, to give up any part of the compensation to which he/she is otherwise entitled. The recipients of funds under this project shall report all suspected or reported violations to: City of Vista, Housing Division, 200 Civic Center Drive, Vista, CA 92084, 760.639.6191.
34. CONFLICT OF INTEREST
In the procurement of supplies, equipment, construction, and services by sub-recipients, the conflict of interest provisions in 24 CFR 85.36, OMB Circular A-110, and 24 CFR 570.611, respectively, shall apply. No employee, officer or agent of the sub-recipient shall participate in selection, or in the award or administration of a Contract supported by Federal funds if a conflict of interest, real or apparent, would be involved.
35. COMPLIANCE WITH CLEAN AIR AND WATER ACTS
08/11/2026 C11 135 of 436
24 During the performance of this Contract , the contractor and all subcontractors shall comply with the requirements of the Clean Air Act, as amended, 42 USC 1857 et seq., the Federal Water Pollution Control Act, as amended, 33 USC 1251 et seq., and the regulations of the Environmental Protection Agency with the respect thereto, at 40 CFR Part 15, as amended.
08/11/2026 C11 136 of 436
25 INSTRUCTIONS FOR SIGNING BIDS, BONDS AND CONTRACTS
CORPORATIONS
Give name of corporation.
Proof of authorization shall be established (pursuant to Corporation Code Section 313) when the corporate officers listed below both sign the documents:
Signatures: Chairman of Board or President or Vice-President AND Secretary or Assistant Secretary or Chief Financial Officer or Assistant Treasurer.
Affix corporate seal and Notary's acknowledgment.
Others may sign to bind the corporation if the Agency has been furnished a certified copy of a resolution of the corporate board of directors authorizing them to do so.
PARTNERSHIPS
Signatures: All members of partnership. One may sign if the Agency has a copy of authorization [i.e., a Certificate of Partnership (State form LP-1 for Limited Partnerships) or a copy of the partnership agreement is sufficient to establish the authority of a single general partner to bind the partnership].
Affix Notary's acknowledgment.
JOINT VENTURES
Give the names of the joint ventures.
Signatures: All joint ventures. One may sign if the Agency has a copy of authorization.
Affix Notary's acknowledgment.
INDIVIDUALS
Signature: The individual.
Affix Notary's acknowledgment.
FICTITIOUS NAMES
Show fictitious names.
Satisfy all pertinent requirements shown above (note: If the Bidder is a sole proprietorship, either a Fictitious Business Name Statement or a City of Vista business license is sufficient to establish the authority of an individual to bind the sole proprietorship).
08/11/2026 C11 137 of 436
26 BONDS
In addition to all pertinent requirements above, give signature of Attorney-in-Fact and apply surety's seal.
08/11/2026 C11 138 of 436
27 BID PROPOSAL
From: ______________________________________________________________, Bidder,
For: The construction of
STREET IMPROVEMENTS
as specifically set forth in documents entitled
NORTH INDIANA AVENUE SIDEWALK IMPROVEMENTS (C.I.P. No. 8402B)
The undersigned hereby proposes and agrees that if his bid as submitted in the attached BID SCHEDULE be accepted, he will contract in the form so approved to perform all work for which a Contract may be awarded him, to furnish any and all plant, labor, services, materials, tools, equipment, supplies, transportation, utilities and all other items and facilities necessary therefore as provided in the Contract Documents, and to do everything required therein for the proposed Project as specifically set forth in said Contract Documents, together with appurtenances thereto, all as set forth on the Drawings and in the Project Specifications and other Contract Documents; and he further proposes and agrees to complete all the Work called for by the Drawings, Project Specifications, and other Contract Documents in strict conformity therewith within the time limits set forth therein; and that he will accept as full payment therefore the prices set forth in the BID SCHEDULE forming a part hereof.
The undersigned hereby submits either a Bid Bond or Bid Security in the form of Cash, a Cashier’s Check, or a Certified Check, using the forms included in these Bid Documents, properly made payable to CITY OF VISTA, hereinafter designated as the Agency, in an amount that is at least ten percent (10%) of the total base bid amount. The Bid Bond or Bid Security is attached hereto and is given as a guaranty that the undersigned will execute the Contract and furnish the required bonds if awarded the Contract and, in case of failure to do so within the time provided, the proceeds of said bond or bid security shall be forfeited to the Agency. The Surety’s liability to the Agency for forfeiture of the face amount of the bond shall be considered as established.
08/11/2026 C11 139 of 436
28 It is understood and agreed that:
1. The undersigned has carefully examined all Bid documents and other Documents which will form the Contract, including all addenda as prepared prior to the date of bid opening setting forth any modifications or interpretations of any said documents.
2. The undersigned has, by investigating the site of work, by reviewing and analyzing the Plans and Specifications, and by otherwise familiarizing himself with the Project, has satisfied himself as to the nature and location of the Work and has fully informed himself as to all conditions and matters which can in any way affect the Work or the cost thereof.
3. The undersigned fully understands the scope of the Work and has included in the various related items of Work the cost of all work not listed as a separate item so that the Bid for the Project reflects the total cost for completing the Work in its entirety, has checked carefully all words and figures inserted in this Bid, and he further agrees that the Agency shall in no way be responsible for any errors or omissions in the preparation of this proposal.
4. The undersigned will execute the Contract and furnish the required Performance Bond, Payment Bond, and proof of insurance coverage within the stipulated time after the posting of a notice to him of acceptance of his bid by the Agency; and further, that this bid may not be withdrawn for a period of ninety (90) calendar days after the date set for the opening thereof unless otherwise required by law. If any bidder shall withdraw his bid within said period, the bidder shall be liable under the provisions of the Bid Security, or the bidder and his surety shall be liable under the Bid Bond, as the case may be.
5. The surety or sureties and insurance companies named in the space provided have agreed to furnish bonds, insurance, and endorsements in the form and amounts set forth in the Contract Documents in the event the Contract is awarded on the basis of this proposal.
6. The undersigned hereby certifies that this proposal is genuine and not sham or collusive or made in the interest or in behalf of any person not herein named, and the undersigned has not directly or indirectly induced or solicited any other bidder to put in a sham bid, or any other person, firm or corporation to refrain from bidding, and the undersigned has not in any manner sought by collusion to secure for himself an advantage over any other bidder.
7. In conformance with current statutory requirements of Section 1860, et. seq., of the Labor Code of the State of California, the undersigned confirms the following as his certification:
“I am aware of the provisions of Section 3700 of the Labor Code which require every employer to be insured against liability for workers’ compensation or to undertake self-insurance in accordance with the provisions of that code, and I will comply with such provisions before commencing the performance of the work of this contract.”
8. Receipt of Addenda No. ___ through ___ is hereby acknowledged. (If none, write “NONE”).
08/11/2026 C11 140 of 436
29 9. The prospective bidder certifies, by INITIALING AFTER THE FOLLOWING STATEMENT and by signing and submitting this bid, to the best of his or her knowledge and belief, that:
No federal appropriated funds have been paid or will be paid, by or on behalf of the undersigned, to any person influencing or attempting to influence an officer or employee of any federal agency, a Member of Congress, an officer or employee of Congress, or an employee of a Member of Congress in connection with the awarding of any federal contract, the making of any federal grant, the making of any federal loan, the entering into of any cooperative agreement, and the extension, continuation, renewal, amendment, or modification of any federal contract, grant, loan, or cooperative agreement.
Initials _______
If any funds other than federal appropriated funds have been paid or will be paid to any person for influencing or attempting to influence an officer or employee of any federal agency, a Member of Congress, an officer or employee of Congress, or an employee of a Member of Congress in connection with this federal contract, grant, loan, or cooperative agreement, the undersigned shall complete and submit Standard Form-LLL, “Disclosure of Lobbying Activities,” in accordance with its instructions. The “Disclosure of Lobby Activities” is form Attachment G on page 12-87 of Exhibit 12-E titled “Federal Requirements for Federal-Aid Construction Project”.
This certification is a material representation of fact upon which reliance was placed when this transaction was made or entered into. Submission of this certification is a prerequisite for making or entering into this transaction imposed by Section 1352, Title 31, U.S. Code. Any person who fails to file the required certifications shall be subject to a civil penalty of not less than $10,000 and not more than $100,000 for each such failure.
The prospective participant also agrees by submitting his or her bid or proposal that he or she shall require that the language of this certification be included in all lower tier subcontracts, which exceed $100,0000 and that all such sub-recipients shall certify and disclose accordingly.
10. In compliance with the Notice Inviting Bids and all the provisions hereinbefore stipulated, the undersigned, with full cognizance thereof, hereby proposes to perform the entire work for the prices set forth in the attached BID SCHEDULE upon which award of the Contract is made.
(Continued on next page)
08/11/2026 C11 141 of 436
30 DATE: ________________, 20_____ BIDDER’S NAME___________________________
BY______________________________________
Signature
________________________________________
Printed Name
TITLE____________________________________
BY______________________________________
Signature
________________________________________
Printed Name
TITLE____________________________________
(CORPORATE SEAL) BIDDER'S MAILING ADDRESS:
Name and address of all members ________________________________________ of the firm or names of all officers
of the corporation. ________________________________________
CORPORATION ORGANIZED UNDER THE LAWS
_________________________________ OF THE STATE OF
_________________________________ ________________________________________
_________________________________ CONTRACTOR'S LICENSE # _________________
_________________________________ EXPIRATION DATE_________________________
_________________________________ CONTRACTOR'S LICENSE CLASS______________
_________________________________ SURETY OR SURETIES: _____________________
_________________________________ ________________________________________
_________________________________ INSURANCE COMPANY:
_________________________________ ________________________________________
I certify (or declare) under penalty of perjury under the laws of the State of California that the foregoing is true and correct:
______________ _________________________________
Date CONTRACTOR'S SIGNATURE
08/11/2026 C11 142 of 436
31 BID SCHEDULE
To be completed through the City’s Electronic Bidding System (OpenGov Procurement)
Pursuant to and in compliance with the Notice Inviting Bids and other Contract Documents relating to the proposal for the construction of
STREET IMPROVEMENTS
as specifically set forth in documents entitled
NORTH INDIANA AVENUE SIDEWALK IMPROVEMENTS (C.I.P. No. 8402B)
all in accordance with the Plans and Project Specifications on file at the City of Vista Engineering Department, the undersigned bidder, having familiarized himself with the terms of the Contract, the local conditions affecting the performance of the Contract and the cost of the Work at the place the Work is to be done; and with the Plans, Project Specifications and other Contract Documents, hereby stipulated; the Contractor agrees to complete the Contract, including all of its component parts and everything required to be performed, and to provide and furnish any and all labor, materials, tools, equipment, expendable supplies and all utility and transportation services necessary to perform the Contract, and complete in a workmanlike manner all of the Work required in connection with the Contract, all in strict conformance with the Plans and Project Specifications on file at the City of Vista Engineering Department.
All items shall be finished and functional per Plans and the Contract Documents. Items designated with an ‘S’ in the Bid Item column of the Bid Schedule are Specialty Items per Subsection 3-2 (“SELF-PERFORMACE”) of the San Diego Regional Supplement to the Greenbook.
08/11/2026 C11 143 of 436
32 BID SCHEDULE
(Provided for reference only)
PROJECT NAME: NORTH INDIANA AVENUE SIDEWALK IMPROVEMENTS (C.I.P. No. 8402B)
TO BE COMPLETED THROUGH THE CITY’S ELECTRONIC OPENGOV PROCUREMENT BIDDING SYSTEM
NOTE 1: The Bid Schedule Worksheet is only provided as a reference for preparing the bid. Only the unit prices and totals entered in the OpenGov Procurement bidding system will be considered valid for purposes of the City’s bid evaluation. The low bidder bid schedule from OpenGov Procurement will be printed and inserted into the final contract documents.
Note 2: Unit prices shall prevail over extended total and grand total prices. Late bids will not be accepted. The following “Description of Base Bid Items” is part of the Bid Schedule and shall be submitted with the bid.
Bid Items
Bid
Item Description Of Work Qty. Unit
GENERAL
1 Mobilization, Demobilization, bonds &
insurance. (5% maximum of Total Base Bid) 1 LS
2 Project Information Sign 2 EA
3 Public Notification per Supplementary General
Provisions, Section 7-12.2 1 LS
4 Storm Water Pollution Prevention and Erosion
Control 1 LS
5 Traffic Control and Construction Staging for all
work 1 LS
6 Utility Potholing and Coordination 1 LS
7 Unforeseen Field Conditions (stipulated amount) $15,000 8 Record Drawing (“As-Built”) Plans (stipulated
amount) $2,000
REMOVAL / RELOCATE / ADJUSTMENT
9 Remove and dispose existing vegetation, roots,
shrubs, landscaping, fences, and any other
existing improvements conflicting with new
improvements.
1 LS
10 Remove Private Property Encroachments at 326
& 332 N Indiana Ave and return encroachments
to property owner
1 LS
11 Tree Removal 4 LS
08/11/2026 C11 144 of 436
33 Bid
Item Description Of Work Qty. Unit
12 Relocate, Reconstruct, Rotate or Replace existing
mailbox and post per City of Vista Standard
Drawing SRF-04 including reflective address
numbers in front and side of mailbox (2”
minimum)
2 EA
13 Relocate existing metal mailbox (includes
construction of new footing) 1 EA
14 Reconfigure Existing Private Irrigation Systems
and Replace Groundcover to Match Existing
Private Landscaping Disturbed by Construction
1 LS
15 Adjust Street Light Utility Box to Finish Grade 1 EA
EARTHWORK
16 Unclassified excavation 1 LS
GENERAL SURFACE IMPROVEMENTS
17 Asphalt concrete pavement for full depth
pavement restoration, 1’ wide slot patch, 6"
depth per SRF-13 58 LF
18 6” Type G’ curb and gutter per SDRSD No. G-2
with 6" of aggregate base 61 LF
19 PCC Cross Gutter and spandrel per SDRSD No. G-
12 on 6" aggregate base (includes curb) 70 SF
20 4" PCC Sidewalk per SDRSD No. G-7 with 6" of
aggregate base 1877 SF
21 PCC Driveway Entrance per SDRSD No. G-14A
with 6" aggregate base 54 SF
22 PCC Alley Driveway Entrance per SDRSD G-14E
on with 6" aggregate base 100 SF
23 PCC curb ramp Type A with grey detectable
warning surface per G-27A on 6” aggregate base 4 EA
24 PCC curb ramp Type D with grey detectable
warning surface per G-31 on 6” aggregate base 1 EA
TRAFFIC IMPROVEMENTS
25 Document existing striping to replace in kind,
remove conflicting markings, install new
striping, crosswalks and pavement markings
per Plan, relocate signs on new posts per TRF-
06 1 LS
BID SCHEDULE WORKSHEET – END
08/11/2026 C11 145 of 436
34 (Provided for reference only)
BID SCHEDULE TO BE COMPLETED THROUGH THE CITY’S ELECTRONIC BIDDING SYSTEM (OPENGOV PROCUREMENT)
NOTE: Determination of the lowest bid shall be based solely on the lowest TOTAL BASE BID FOR IMPROVEMENTS.
Unit prices shall prevail over extended total and grand total prices. Late bids will not be accepted.
Description of Base Bid Items:
(Scan and Include with Bid Package)
Bid Item 1, Mobilization & Demobilization, bonds & insurance. (5% maximum of Total Base Bid): Bid item shall include full compensation for all bonds, insurance, sureties, licenses, permits, facilities, labor, equipment and material necessary to complete all work required in advance of construction operations, and upon the initiation of construction operations, to mobilize all required equipment, materials and personnel on-site, and complete all associated and appurtenant work in accordance with the Standard Specifications, the Supplementary General Provisions, and as directed by the Engineer. The Bid Item shall also include all labor, equipment and material required to clean-up and restore the site, demobilize and remove all equipment, materials, and staging, and complete all work required at the end of construction operations in accordance with the Standard Specifications, the Supplementary General Provisions, and as directed by the Engineer. The lump sum price for this item shall not exceed 5% of the total contract price (5% maximum of Total Bid).
Bid Item 2, Project Information Sign: Bid item shall include full compensation for labor, materials and equipment to fabricate, install and maintain project information sign, placed at the North or South edge of the project, providing project and funding information throughout project duration.
Bid Item 3, Public Notification per Supplementary General Provisions, Section 7-12.2: Bid item shall include all necessary labor, equipment, materials, and all other related costs for preparation, copying, and distribution shall be considered as included in the lump sum price Bid for Public Notification Bid Item 4, Storm Water Pollution Prevention and Erosion Control: Bid item shall include full compensation for submitting the required storm water permit (located in the appendix) including all labor, equipment and materials required to complete all work necessary to install, maintain, repair and replace all temporary construction BMPs to prevent the discharge of any materials into the storm drain system. No additional compensation will be made.
Bid Item 5, Traffic Control and Construction Staging for all work: Bid item shall include full compensation for all labor, equipment and materials required to complete all work required to prepare, submit and obtain approved Traffic Control Plans from the City of Vista Traffic Engineering Department and handle traffic (including flagging costs and person(s) to safely control pedestrian and vehicular traffic for single lane closures, furnish tools, equipment and incidentals, and for doing all work involved in staging constructing, furnishing, placing, removing, storing, maintaining, moving to new locations, replacing and disposing of the components of the traffic control system (including traffic control devices, temporary steel plate bridging, temporary road resurfacing); installation and removal of all required temporary striping and signing associated and appurtenant work as specified in the Standard Specifications, the Supplementary General Provisions, per plans and as directed by the Engineer. No additional compensation will be made.
Bid Item 6, Utility Coordination and Potholing: Bid item shall include full compensation for all labor, equipment, and material required to coordinate with all utilities agencies which “may be affected” or “are affected” by the Work in accordance with the Standard Specifications, the Supplementary General Provisions, and as directed by the Engineer. The location, protection, and restoration of existing utilities and improvements, specifically identified for payment under other bid items shall not be included for payment 08/11/2026 C11 146 of 436
35 within this bid item. All other locations, protection and restoration required to complete the Work shall be incorporated into this bid item.
Bid Item 7, Unforeseen Field Conditions (stipulated amount): Bid item shall include full compensation for all labor, equipment and material required to repair, construct, rehabilitate, remove, dispose, relocate, adjust any necessary and unforeseen site feature, utility infrastructure, surface improvements, or unsuitable soil condition, as directed by the Engineer, according to these specifications. No additional compensation will be made. This Bid Item is not subject to Section 3 Changes In Work, and no payment will be made unless the Engineer provides a written Notice to Proceed, or written approval for this bid item.
Bid Item 8, Record Drawing (“As-Built”) Plans (stipulated amount): Bid item shall include full compensation for all labor, equipment and material required to provide City with accurate “red line” plans showing the exact location of all improvements, existing utilities, that have been modified as part of the Work.
Bid Item 9, Remove and dispose existing vegetation, roots, shrubs, landscaping, fences, and any other existing improvements conflicting with new improvements: Bid item shall include full compensation for all labor, equipment and material required to complete all work necessary to remove and legally dispose all natural and artificial objectionable material within the limits of excavation, as required to complete the Work and additional clearing and grubbing as may be identified within the Contract including but not limited to, landscaping, vegetation, shrubs, tree and shrub trimming, roots, stumps, irrigation, yard drains, AC and PCC driveways, AC and PCC sidewalks, decorative pavers, aggregate base, curbs, gutters, drainage pipes, fences, block walls or other surface features in conflict with the project improvements. No additional compensation will be made.
Bid Item 10, Remove Private Property Encroachments and return encroachments back to property owner: Bid item shall include full compensation for all labor, equipment and material required to complete all work necessary to remove, salvage without damage, store and return all private property encroachments, at 326 & 332 N Indiana Ave, in conflict with the project improvements, in the Public Right of Way back to its respective property owner as required to complete the Work. City sent Notice to Property Owners which ordered the removal of all encroachments by August 1st, 2026. Work under this bid items shall be in accordance with the Contract Drawings, Standard Specifications, the Supplementary General Provisions, the Supplementary Technical Provisions and as directed by the Engineer, any other related work shall be considered as included or included in the costs of other work for this item. No additional compensation will be made.
Bid Item 11, Tree Removal: Bid item shall include full compensation for all labor, equipment and material required to complete all work necessary to remove and legally dispose any tree, stump and root network within the limits of excavation, as required to complete the Work in accordance with the Contract Drawings, Standard Specifications, the Supplementary General Provisions, the Supplementary Technical Provisions and as directed by the Engineer, any other related work shall be considered as included or included in the costs of other work. No additional compensation will be made.
Bid Item 12, 'Relocate, Reconstruct, Rotate or Replace existing mailbox and post per City of Vista Standard Drawing SRF-04 including reflective address numbers in front and side of mailbox (2” minimum): Bid item shall include full compensation for all labor, equipment and material required to complete all work necessary to relocate, reconstruct, rotate or replace existing mailbox and post per City of Vista Standard Drawing SRF- 04 including reflective address numbers in front and side of mailbox (2” minimum), including coordination with property owner, as shown on the plans, in accordance with the Contract Drawings, Standard Specifications, the Supplementary General Provisions, the Supplementary Technical Provisions and as directed by the Engineer, any other related work shall be considered as included or included in the costs of other work. Work associated with notification and any coordination with property owner and/or mail agency is included in the cost of work for this bid item. No additional compensation will be made. 08/11/2026 C11 147 of 436
36 Bid Item 13, Relocate existing metal mailbox (includes construction of new footing): Bid item shall include full compensation for all labor, equipment and material required to complete all work necessary to relocate, remove, rotate and place existing metal mailbox and metal post with new 12”x18”x36” concrete footing, as shown on the plans, in accordance with the Contract Drawings, Standard Specifications, the Supplementary General Provisions, the Supplementary Technical Provisions and as directed by the Engineer, any other related work shall be considered as included or included in the costs of other work. Work associated with notification and any coordination with property owner and/or mail agency is included in the cost of work for this bid item. No additional compensation will be made.
Bid Item 14, Reconfigure Existing Private Irrigation Systems and Replace Groundcover to Match Existing Private Landscaping Disturbed by Construction.: Bid item shall include full compensation for all labor, materials, and equipment required to reconfigure private irrigation affected by the proposed improvements, verify irrigation working order, replace turf/groundcover/sod to match private landscaping as directed by the Engineer, shown on the plans, according to these specifications, plumbing code and any other related work shall be considered as included or included in the costs of other work. No additional compensation will be made.
Bid Item 15, Adjust Street Light Utility Box to Finish Grade: Bid item shall include full compensation for all labor, equipment and material required to adjust existing street light electric pull box covers flush and even with final and temporary finish surfaces per Contract Specifications and any other related work shall be considered as included or included in the costs of other work. No additional compensation will be made.
Bid Item 16, Unclassified excavation: Bid item shall include full compensation for all labor, equipment and material required to complete all work necessary for the roadway, parkway, slope excavation, transitions to existing, grading, compaction, dewatering, export excess material, borrow, subgrade preparation, restoration, and export of excess soil to a legal disposal site as required to complete the Work in accordance with the Standard Specifications, the Supplementary General Provisions, the Supplementary Technical Provisions 300- 2, typical section as shown on the Plans, the Plans and as directed by the Engineer and any other related work shall be considered as included or included in the costs of other work. No additional compensation will be made.
Bid Item 17, Asphalt concrete pavement for full depth pavement restoration, 1’ wide slot patch, 6" depth per SRF-13: Bid item shall include full compensation for all labor, equipment, material, and mobilization for installation of asphalt concrete, i.e. Hot Mix Asphalt (HMA), compacted in place. The Work shall include, but may not necessarily be limited to prime coat, tack coat, distribution, spreading, rolling, compacting, joining, adjusting (resetting) of manholes and other structures, associated and appurtenant work, in accordance with Section 302-5. of the Supplementary General Provisions, the Standard Specifications, the Supplementary Technical Provisions and as directed by the Engineer, called for in the plans and any other related work shall be considered as included or included in the costs of other work. No additional compensation will be made
Bid Item 18, 6” Type ‘G’ curb and gutter per SDRSD No. G-2 with 6” aggregate base: Bid item shall include full compensation for all labor, equipment and material required to construct 6” curb and gutter per SDRSD G-2, on minimum of 6” class 2 base under curb and gutter as directed by the Engineer, shown on the plans, according to these specifications and any other related work shall be considered as included or included in the costs of other work. This bid item includes curb and gutter quantities associated with driveway entrances or driveway wings. No additional compensation will be made.
Bid Item 19, PCC Cross Gutter per SDRSD No. G-12 with 6” aggregate base: Bid item shall include full compensation for all labor, equipment and material required to construct concrete curb, cross gutter and 08/11/2026 C11 148 of 436
37 spandrel per SDRSD G-12, on minimum of 6” class 2 base as directed by the Engineer, shown on the plans, according to these specifications and any other related work shall be considered as included or included in the costs of other work. No additional compensation will be made.
Bid Item 20, 4” PCC sidewalk per SDRSD No. G-07 with 6” aggregate base: Bid item shall include full compensation for all labor, equipment and material required to construct concrete sidewalk per SDRSD G-07, on minimum of 6” class 2 base as directed by the Engineer, shown on the plans, according to these specifications and any other related work shall be considered as included or included in the costs of other work. No additional compensation will be made. This bid item quantity excludes the area of the sidewalk behind all driveway entrances, since that portion is included in the description for the bid item 19 Driveway Entrance.
Bid Item 21, PCC Driveway Entrance per SDRSD No. G-14A per plan with 6" aggregate base: Bid item shall include full compensation for all labor, equipment and material required to dowel new driveway into existing driveway, construct concrete driveway per SDRSD G-14A as modified per plan on 6” compacted aggregate base, as directed by the Engineer, shown on the plans, according to these specifications and any other related work shall be considered as included or included in the costs of other work. No additional compensation will be made
Bid Item 22, PCC Driveway Entrance per SDRSD G-14E with 6" aggregate base: Bid item shall include full compensation for all labor, equipment and material required to dowel new driveway into existing driveway, construct concrete driveway per SDRSD G-14E per plan on 6” compacted aggregate base, as directed by the Engineer, shown on the plans, according to these specifications and any other related work shall be considered as included or included in the costs of other work. No additional compensation will be made
Bid Item 23, PCC curb ramp Type A with grey detectable warning surface per G-27A on 6” aggregate base: Bid item shall include full compensation for all labor, equipment and material required to construct concrete curb ramps with truncated domes (dark grey color), sidewalk, and 6” aggregate base per SDRSD G-29 as directed by the Engineer, shown on the plans, according to these specifications, curb ramp checklist and any other related work shall be considered as included or included in the costs of other work. No additional compensation will be made.
Bid Item 24, PCC curb ramp Type D with grey detectable warning surface per G-31 on 6” aggregate base: Bid item shall include full compensation for all labor, equipment and material required to construct concrete curb ramps with truncated domes (dark grey color), sidewalk, and 6” aggregate base per SDRSD G-31 as directed by the Engineer, shown on the plans, according to these specifications, curb ramp checklist and any other related work shall be considered as included or included in the costs of other work. No additional compensation will be made.
Bid Item 25, Document existing striping to replace in kind, remove conflicting markings, install new striping, crosswalks and pavement markings per Plan, relocate signs on new posts per TRF-06: Bid item shall include full compensation for all labor, equipment and material required to document and remove existing pavement markings (by grinding or sandblasting), install or apply new thermoplastic pavement markings, install or apply painted striping, install or relocate traffic signs on new posts, per Caltrans Standard Details A24A-F, City of Vista Traffic Standards, as directed by the Engineer, shown on the plans, according to these specifications and any other related work shall be considered as included or included in the costs of other work. Prior to construction, contractor shall document all signing and striping that will be affected by construction and replace as needed. No additional compensation will be made.
--END OF BID SCHEDULE--
08/11/2026 C11 149 of 436
38 CONTRACTOR'S LICENSING STATEMENT
The undersigned is licensed in accordance with the laws of the State of California providing for the registration of Contractors.
Contractor's License Number: _________________________________________________________________
Contractor's License Class: _________________________________________________________________
Expiration Date: _________________________________________________________________
(As described in the INSTRUCTIONS FOR SIGNING BIDS, BONDS AND CONTRACTS, complete and sign the appropriate section for your company)
Name of Individual Contractor (Print or type): ____________________________________________________
Signature of Contractor: _________________________________________________________________
Business Address: _________________________________________________________________
or
Name of Partnership or Joint Venture Firm: ____________________________________________________
Business Address: ________________________________________________________________________
Signature, printed name, title and address of members signing on behalf of the partnership:
Signature: _____________________ Name: ______________________ Title: ______________________
Address: _________________________________________________________________________________
Signature: _____________________ Name: ______________________ Title: ______________________
Address: _________________________________________________________________________________
or
Name of Corporation: ________________________________________________________________________
Business Address: ________________________________________________________________________
Corporation organized under the laws of the State of _____________________________________________
_______________________________________ __________________________________________ Signature of Officer of Corporation Printed Name and Title
_______________________________________ __________________________________________ Signature of Officer of Corporation Printed Name and Title 08/11/2026 C11 150 of 436
39 PROJECT REFERENCES
The Bidder shall provide evidence that the Bidder has had the prior experience to properly perform in accordance with the terms of these Plans and Project Specifications.
List ALL contracts with public agencies entered within the past five (5) years of the most recent projects for which the Bidder has completed work of similar size and complexity to this project as the General (or Prime) Contractor, and the names and phone numbers of the contracting public agencies. Make copies of this page for listing additional projects.
Project
No. Date Completed Public Agency Name,
Contact Person & Phone
Project Name and Description of
Work Contract Amount
1. 2.
3. 4.
5. 6.
7. Note: Attached pre-printed list to this page to list additional projects. 08/11/2026 C11 151 of 436
40 CONTRACTOR’S LIST OF SUBCONTRACTORS
PROJECT NAME: NORTH INDIANA AVENUE SIDEWALK IMPROVEMENTS (C.I.P. No. 8402B)
NAME OF BIDDER: ______________________________________________________________________________
In accordance with Division 2, Part 1, Chapter 4 of the Public Contract Code, the prime Contractor shall submit with its Bid a list of subcontractors who will perform work in excess of one-half of one percent (0.5%) of the prime Contractor’s total Bid or $10,000, whichever is greater.
Subcontractors listed must be properly licensed for the type of work they are to perform, and their license numbers must be indicated below. Do not list alternate subcontractors for the same work.
Name under which
Subcontractor is licensed
License No.
and Class
Address of Office,
Mill or Shop
DBE
(Yes/No)
Bid
Item
No(s).
Description of
Subcontractor’s
Portion of Work
Dollar Value
of
Subcontract
(Provide additional copies of this sheet if needed)
08/11/2026 C11 152 of 436
41 NON-COLLUSION DECLARATION
NORTH INDIANA AVENUE SIDEWALK IMPROVEMENTS (C.I.P. No. 8402B)
TO BE EXECUTED BY BIDDER AND SUBMITTED WITH BID
The undersigned declares:
I am the __________________ of _________________________________, the party making the foregoing bid. (Title) (Company Name)
The bid is not made in the interest of, or on behalf of, any undisclosed person, partnership, company, association, organization, or corporation. The bid is genuine and not collusive or sham. The bidder has not directly or indirectly induced or solicited any other bidder to put in a false or sham bid. The bidder has not directly or indirectly colluded, conspired, connived, or agreed with any bidder or anyone else to put in a sham bid, or to refrain from bidding. The bidder has not in any manner, directly or indirectly, sought by agreement, communication, or conference with anyone to fix the bid price of the bidder or any other bidder, or to fix any overhead, profit, or cost element of the bid price, or of that of any other bidder. All statements contained in the bid are true. The bidder has not, directly or indirectly, submitted his or her bid price or any breakdown thereof, or the contents thereof, or divulged information or data relative thereto, to any corporation, partnership, company, association, organization, bid depository, or to any member or agent thereof, to effectuate a collusive or sham bid, and has not paid, and will not pay, any person or entity for such purpose.
Any person executing this declaration on behalf of a bidder that is a corporation, partnership, joint venture, limited liability company, limited liability partnership, or any other entity, hereby represents that he or she has full power to execute, and does execute, this declaration on behalf of the bidder.
I declare under penalty of perjury under the laws of the State of California that the foregoing is true and correct and that this declaration is executed on
________________________, at ________________________________, ___________________________.” (Date) (City) (State)
________________________________________
Signature
________________________________________
Printed Name
________________________________________
Title
08/11/2026 C11 153 of 436
42 CONTRACTOR’S CERTIFICATION ON FEDERAL CONTRACT
REQUIREMENTS
I hereby certify that I have reviewed the federal construction contract-related requirements (included in appendices A, B, and C) imposed on the Contractor(s) of CDBG Grant Program- funded construction projects and fully understand all my obligations if the project is awarded to me.
Project Name:
Location:
Amount of Bid: $
Name of Bidder
Print Name and Title
Street Address
City, State Zip Code
Signature
08/11/2026 C11 154 of 436
43 Certification Regarding Debarment, Suspension, Proposed Debarment, and Other Responsibility Matters (Per 48CFR 52.209-5)
1. The Bidder certifies, to the best of its knowledge and belief, that the Bidder and its Principals, and any of its prospective subcontractors for this award:
a) Are not presently debarred, suspended, proposed for debarment, or declared ineligible for the award of contracts by any Federal, State or local agency;
b) Have not, within a three-year period preceding this offer, been convicted of or had a civil judgment rendered against them for: commission of fraud or a criminal offense in connection with obtaining, attempting to obtain, or performing a public (Federal, State, or local) contract or subcontract; violation of Federal or State antitrust statutes relating to the submission of offers; or commission of embezzlement, theft, forgery, bribery, falsification or destruction of records, making false statements, tax evasion, violating Federal, State or local criminal tax laws, or receiving stolen property (if Bidder checks “have”, the Bidder shall also see 52.209-7, if included in this solicitation);
c) Are not presently indicted for, or otherwise criminally or civilly charged by a governmental entity with, commission of any of the offenses enumerated in subdivision (a)(1)(i)(B) of this provision;
d) Have not, within a three-year period preceding this offer, been notified of any delinquent Federal, State or local taxes in an amount that exceeds $3,000 for which the liability remains unsatisfied.
e) Have not, within a 3-year period preceding this offer, had one or more contracts terminated for default by any Federal, State or local agency; and
f) Do not have an Active Exclusion on the System for Award Management (SAM), which is available at https://sam.gov/
2. The Bidder shall provide immediate written notice to the Contracting Officer if, at any time prior to contract award, the Bidder learns that its certification was erroneous when submitted or has become erroneous by reason of changed circumstances.
3. The certification in paragraph (1) of this provision is a material representation of fact upon which reliance was placed when making award. If it is later determined that the Bidder knowingly rendered an erroneous certification, in addition to other remedies available to the Government, the Contracting Officer may terminate the contract resulting from this award for default.
4. Where the Bidder is unable to certify to any of the statements in this certification, such prospective participant shall attach an explanation to this certification form.
Company Name: Date:
Name: Signature:
(President or Authorized Official of Consultant)
Guidance:
(A) Bidder’s (or its subconsultant’s) inability to certify to the items in paragraph (1)(B), (1)(C), (1)(D), and (1)(E) will not necessarily result in withholding of an award. However, this certification will be considered in connection with a determination of the Bidder's responsibility. Failure of the Bidder to furnish a certification or provide such additional information as required in paragraph (4) above or as requested by the Contracting Officer may render 08/11/2026 C11 155 of 436
44 Certification Regarding Debarment CONT.
the Bidder nonresponsible. Nothing contained in the foregoing shall be construed to require establishment of a system of records in order to render, in good faith, the certification required by paragraph (1) above. The knowledge and information of an Bidder is not required to exceed that which is normally possessed by a prudent person in the ordinary course of business dealings.
(B) “Principal”, for the purposes of this certification, means an officer, director, owner, partner, or a person having primary management or supervisory responsibilities within a business entity (e.g., general manager; plant manager; head of a division or business segment; and similar positions).
(C) Federal taxes are considered delinquent if both of the following criteria apply:(i) The tax liability is finally determined. The liability is finally determined if it has been assessed. A liability is not finally determined if there is a pending administrative or judicial challenge. In the case of a judicial challenge to the liability, the liability is not finally determined until all judicial appeal rights have been exhausted. (ii) The taxpayer is delinquent in making payment. A taxpayer is delinquent if the taxpayer has failed to pay the tax liability when full payment was due and required. A taxpayer is not delinquent in cases where enforced collection action is precluded.
Examples. (i) The taxpayer has received a statutory notice of deficiency, under I.R.C. § 6212, which entitles the taxpayer to seek Tax Court review of a proposed tax deficiency. This is not a delinquent tax because it is not a final tax liability. Should the taxpayer seek Tax Court review, this will not be a final tax liability until the taxpayer has exercised all judicial appeal rights. (ii) The IRS has filed a notice of Federal tax lien with respect to an assessed tax liability, and the taxpayer has been issued a notice under I.R.C. § 6320 entitling the taxpayer to request a hearing with the IRS Office of Appeals contesting the lien filing, and to further appeal to the Tax Court if the IRS determines to sustain the lien filing. In the course of the hearing, the taxpayer is entitled to contest the underlying tax liability because the taxpayer has had no prior opportunity to contest the liability. This is not a delinquent tax because it is not a final tax liability. Should the taxpayer seek tax court review, this will not be a final tax liability until the taxpayer has exercised all judicial appeal rights.(iii) The taxpayer has entered into an installment agreement pursuant to I.R.C. § 6159. The taxpayer is making timely payments and is in full compliance with the agreement terms. The taxpayer is not delinquent because the taxpayer is not currently required to make full payment.(iv) The taxpayer has filed for bankruptcy protection. The taxpayer is not delinquent because enforced collection action is stayed under 11 U.S.C. 362 (the Bankruptcy Code). 08/11/2026 C11 156 of 436
45 _________
______________
_________
_____________
_______________________
DISCLOSURE OF LOBBYING ACTIVITIES Approved by OMB
Complete this form to disclose lobbying activities pursuant to 31 U.S.C. 1352 0348-0046 (See reverse for public burden disclosure.)
1. Type of Federal Action:
a. contract
b. grant
c. cooperative agreement
d. loan
e. loan
f. loan insurance
2. Status of Federal Action:
a. bid/offer/application
b. initial award
c. post-award
3. Report Type:
a. initial filing
b. material change
For Material Change Only:
year quarter
date of last report
4. Name and Address of Reporting Entity:
Prime Subawardee
Tier , if known :
Congressional District, if known : 4c
5. If Reporting Entity in No. 4 is a Subawardee, Enter Name and Address of Prime:
Congressional District, if known :
6. Federal Department/Agency: 7. Federal Program Name/Description:
CFDA Number, if applicable :
8. Federal Action Number, if known : 9. Award Amount, if known :
$
10. a. Name and Address of Lobbying Registrant b. Individuals Performing Services (including address if ( if individual, last name, first name, MI ): different from No. 10a ) (last name, first name, MI ):
11. Information requested through this form is authorized by title 31 U.S.C. section 1352. This disclosure of lobbying activities is a material representation of fact upon which reliance was placed by the tier above when this transaction was made or entered into. This disclosure is required pursuant to 31 U.S.C. 1352. This information will be available for public inspection. Any person who fails to file the required disclosure shall be subject to a civil penalty of not less than $10,000 and not more than $100,000 for each such failure.
Signature:
Print Name:
Title:
Telephone No.: Date:
Federal Use Only: Authorized for Local Reproduction
Standard Form LLL (Rev. 7-97)
INDICATE “N/A” IF NO LOBBYING ACTIVITIES
guarantee
08/11/2026 C11 157 of 436
46 INSTRUCTIONS FOR COMPLETION OF SF-LLL, DISCLOSURE OF LOBBYING ACTIVITIES This disclosure form shall be completed by the reporting entity, whether subawardee or prime Federal recipient, at the initiation or receipt of a covered Federal action, or a material change to a previous filing, pursuant to title 31 U.S.C. section 1352. The filing of a form is required for each payment or agreement to make payment to any lobbying entity for influencing or attempting to influence an officer or employeeof any agency, a Member of Congress, an officer or employeeof Congress, or an employeeof a Member of Congress in connection with a covered Federal action. Completeall items that apply for both the initial filing and material change report. Refer to the implementing guidance published by the Office of Management and Budget for additional information.
1. Identify the type of covered Federal action for which lobbying activity is and/or has been secured to influence the outcome of a covered Federal action.
2. Identify the status of the covered Federal action.
3. Identify the appropriate classification of this report. If this is a followup report caused by a material change to the information previously reported, enter the year and quarter in which the change occurred. Enter the date of the last previously submitted report by this reporting entity for this covered Federal action.
4. Enter the full name, address, city, State and zip code of the reporting entity. Include Congressional District, if known. Check the appropriate classification of the reporting entity that designates if it is, or expects to be, a prime or subaward recipient. Identify the tier of the subawardee, e.g., the first subawardee of the prime is the 1st tier. Subawards include but are not limited to subcontracts, subgrants and contract awards under grants.
5. If the organization filing the report in item 4 checks "Subawardee," then enter the full name, address, city, State and zip code of the prime Federal recipient. Include Congressional District, if known.
6. Enter the name of the Federal agency making the award or loan commitment. Include at least one organizationallevel below agency name, if known. For example, Department of Transportation, United States Coast Guard.
7. Enter the Federal program name or description for the covered Federal action (item 1). If known, enter the full Catalog of Federal Domestic Assistance (CFDA) number for grants, cooperative agreements, loans, and loan commitments.
8. Enter the most appropriate Federal identifying number available for the Federal action identified in item 1 (e.g., Request for Proposal (RFP) number; Invitation for Bid (IFB) number; grant announcement number; the contract, grant, or loan award number; the application/proposal control number assigned by the Federal agency). Include prefixes, e.g., "RFP-DE-90-001."
9. For a covered Federal action where there has been an award or loan commitment by the Federal agency, enter the Federal amount of the award/loan commitment for the prime entity identified in item 4 or 5.
10. (a) Enter the full name, address, city, State and zip code of the lobbying registrant under the Lobbying Disclosure Act of 1995 engaged by the reporting entity identified in item 4 to influence the covered Federal action.
(b) Enter the full names of the individual(s) performing services, and include full address if different from 10 (a). Enter Last Name, First Name, and Middle Initial (MI).
11. The certifying official shall sign and date the form, print his/her name, title, and telephone number.
According to the Paperwork Reduction Act, as amended, no persons are required to respond to a collection of information unless it displays a valid OMB Control Number. The valid OMB control number for this information collection is OMB No. 0348-0046. Public reporting burden for this collection of information is estimated to average 10 minutes per response, including time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding the burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Office of Management and Budget, Paperwork Reduction Project (0348-0046), Washington, DC 20503.
08/11/2026 C11 158 of 436
47 EQUAL EMPLOYMENT OPPORTUNITY CERTIFICATION
Executive Order 11246
This certification is required pursuant to Executive Order 11246 (30 F. R. 12319-25). The implementing rules and regulations provide that any bidder or prospective contractor, or any of their proposed subcontractors, shall state as an initial part of the bid or negotiations of the contract whether it has participated in any previous contract or subcontract subject to the equal opportunity clause, and, if so, whether it has filed all compliance reports due under applicable instructions.
Where the certification indicates that the bidder has not filed a compliance report due under applicable instructions, such bidder shall be required to submit a compliance report within seven calendar days after bid opening. No contract shall be awarded unless such report is submitted.
1. Bidder has participated in a previous contract or subcontract subject to the Equal Opportunity Clauses, as required by Executive Orders 10925, 11114, 11246, or 11375.
YES, If yes, identify the most recent contract:
NO
2. Compliance reports were required to be filed in connection with such contract or subcontract.
YES, If yes, identify the most recent contract:
NO
3. Bidder has filed all compliance reports due under applicable instructions. YES
NO
4. Have you ever been or are you being considered for sanction due to violation of Executive Order 11246, as amended?
YES
NO
Company:
Signature Title Date
Signature Title Date
08/11/2026 C11 159 of 436
48 NON-SEGREGATED FACILITIES CERTIFICATION EXECUTIVE ORDER 11246 (30 F.R. 12319-25)
This certification is required pursuant to Executive Order 11246 (30 F.R. 12319-25). The bidder's attention is called to the clause entitled Equal Employment Opportunity of the General Conditions of the Contract for Construction.
"Segregated facilities," as used in this provision, means any waiting rooms, work areas, rest rooms and wash rooms, restaurants and other eating areas, time clocks, locker rooms and other storage or dressing areas, parking lots, drinking fountains, recreation or entertainment areas, transportation, and housing facilities provided for employees, that are segregated by explicit directive or are in fact segregated on the basis of race, color, religion, or national origin because of habit, local custom, or otherwise.
By the submission of this bid, the bidder certifies that it does not and will not maintain or provide for its employees any segregated facilities at any of its establishments, and that it does not and will not permit its employees to perform their services at any location under its control where segregated facilities are maintained. The bidder agrees that a breach of this certification is a violation of the Equal Employment Opportunity clause in the contract.
The bidder further agrees that (except where it has obtained identical certifications from proposed subcontractors for specific time periods) prior to entering into subcontracts which exceed $10,000 and are not exempt from the requirements of the Equal Employment Opportunity clause, it will obtain identical certifications from the proposed subcontractors; retain the certifications in its files; and forward the following notice to the proposed subcontractors (except if the proposed subcontractors have submitted identical certifications for specific timeperiods):
Notice to Prospective Subcontractors of Requirement for Certifications of Non- segregated Facilities
A Certification of Non-segregated Facilities must be submitted before the award of a subcontract exceeding $10,000 which is not exempt from the provisions of the Equal Employment Opportunity clause of the prime contract. The certification may be submitted either for each subcontract or for all subcontracts during a period (i.e., quarterly, semiannually, or annually).
I, hereby certify that all the information stated herein, as well as any information provided in the accompaniment herewith, is true and accurate.
Company:
Signature Title Date
Signature Title Date
08/11/2026 C11 160 of 436
49 NON-LOBBYING CERTIFICATION FOR FEDERAL-AID CONTRACTS
The prospective participant certifies, by signing and submitting this bid or proposal, to the best of his or her knowledge and belief, that:
1. No Federal appropriated funds have been paid or will be paid, by or on behalf of the undersigned, to any person for influencing or attempting to influence an officer or employee of any Federal agency, a Member of Congress, an officer or employee of Congress, or an employee of a Member of Congress in connection with the awarding of any Federal contract, the making of any Federal grant, the making of any Federal loan, the entering into of any cooperative agreement, and the extension, continuation, renewal, amendment, or modification of any Federal contract, grant, loan, or cooperative agreement.
2. If any funds other than Federal appropriated funds have been paid or will be paid to any person for influencing or attempting to influence an officer or employee of any Federal agency, a Member of Congress, an officer or employee of Congress, or an employee of a Member of Congress in connection with this Federal contract, grant, loan, or cooperative agreement, the undersigned shall complete and submit Standard Form-LLL, "Disclosure of Lobbying Activities," in conformance with its instructions.
This certification is a material representation of fact upon which reliance was placed when this transaction was made or entered into. Submission of this certification is a prerequisite for making or entering into this transaction imposed by Section 1352, Title 31, U.S. Code. Any person who fails to file the required certification shall be subject to a civil penalty of not less than $10,000 and not more than $100,000 for each such failure.
The prospective participant also agrees by submitting his or her bid or proposal that he or she shall require that the language of this certification be included in all lower tier subcontracts, which exceed $100,000 and that all such subrecipients shall certify and disclose accordingly.
BIDDER’S SIGNATURE DATE
08/11/2026 C11 161 of 436
50 NON-COLLUSION DECLARATION
, being first duly sworn, deposes and says that
he is of the party making the
attached bid; that the bid is not made in the interest of, or on behalf of, any undisclosed person, partnership, company, association, organization, or corporation; that the bid is genuine and not collusive or sham; that the bidder has not directly or indirectly induced or solicited any other bidder to put in a false or sham bid, and has not directly or indirectly colluded, conspired, connived, or agreed with any bidder or anyone else to put in a sham bid, or that anyone shall refrain from bidding; that the bidder has not in any manner, directly or indirectly, sought by agreement, communication, or conference with anyone to fix the bid price of the bidder or any other bidder, or to fix any overhead, profit, or cost element of the bid price, or of that of any other bidder, or to secure any advantage against the public body awarding the contract of anyone interested in the proposed contract; that all statements contained in the bid are true; and, further, that the bidder has not, directly or indirectly, submitted his or her bid price or any breakdown thereof, or the contents thereof, or divulged information or data relative thereto, or paid, and will not pay, any fee to any corporation, partnership, company association, organization, bid depository, or to any member or agent thereof to effectuate a collusive or sham bid.
I certify (or declare) under penalty of perjury under the laws of the State of California that the foregoing is true and correct.
Name of Bidder
Signature
Printed Name and Title
Dated
08/11/2026 C11 162 of 436
51 BID SECURITY FORM
(For Cash or Checks)
Note: This form is to be used when the Bidder chooses to submit cash or a check instead of a bid bond as bid security. Cash or a cashier’s or certified check in the amount of not less than ten percent (10%) of the total Base Bid must accompany the bid.
KNOW ALL PERSONS BY THESE PRESENTS that:
WHEREAS the City of Vista (“Agency”) has issued an invitation for bids for the work described as follows:
Work Description.
WHEREAS
(Name, address, and telephone number of Bidder)
the undersigned bidder (“Bidder”), has submitted the accompanying bid to Agency for the work.
WHEREAS, bidders are required under the provisions of the Vista Municipal Code to furnish a form of bidder’s security with their bid.
NOW, THEREFORE, the undersigned Bidder, is held and firmly bound unto Agency in the penal sum not less than ten percent (10%) of the total base bid amount, in lawful money of the United States of America in the form of *Cash, *a Certified Check, *a Cashier’s Check (* Strike out the inapplicable words) for the payment of which sum we bind ourselves, our heirs, executors, administrators, successors, and assigns, jointly and severally, firmly by these presents.
THE CONDITION OF THIS OBLIGATION IS SUCH THAT, if the Bidder shall not withdraw said bid within the period specified in the bidding specification, or, if no period be specified, for ninety (90) calendar days after the bid opening; or if the Bidder does not attempt to withdraw the bid when the requirements of Public Contract Code §5101 et seq. are not met; or if the Bidder is awarded a contract for the work by Agency and, within the time and in the manner required by the bidding specification , or if no period be specified, within ten (10) working days after the Contract is awarded, enters into the written form of contract included with bidding specification, furnishes the required bonds, one to guarantee faithful performance and the other to guarantee payment for labor and materials, and furnishes the required insurance coverages, then this obligation shall become null and void and the cash or check shall be returned to Bidder; otherwise, the proceeds of the cash or check shall become the property of the Agency and the Bidder shall have no further interest therein. [Text and signatures continued on page 2.]
08/11/2026 C11 163 of 436
52 BID SECURITY FORM
In case suit is brought against the Bidder based on this obligation, Bidder further agrees to pay all court costs incurred by Agency in the suit and reasonable attorneys’ fees in an amount fixed by the court.
IN WITNESS WHEREOF, this instrument has been duly executed by Bidder on the date set forth below, the name of each corporate officer being hereto affixed, and these presents duly signed by its undersigned representative(s) pursuant to authority of its governing body.
Dated:
Bidder
By:
Its
By:
Its (Seal)
This form must be dated, all signatures must be notarized, and evidence of the authority of any person signing as attorney-in-fact must be attached.
08/11/2026 C11 164 of 436
53 Bond No.:
BID BOND
KNOW ALL PERSONS BY THESE PRESENTS that:
The City of Vista (“City”) has issued an invitation for bids for the work described as follows:
Work Description.
(Name, address, and telephone number of Bidder)
the undersigned bidder (“Principal”), has submitted the accompanying bid to City for the work.
Bidders are required under the provisions of the Contract to furnish a form of bidder’s security with their bid.
NOW, THEREFORE, we, the undersigned Principal, and
(Name, address, and telephone number of Surety)
(“Surety”) a duly admitted surety insurer under the laws of the State of California, as Surety, are held and firmly bound unto City in the penal sum not less than ten percent (10%) of the total base bid amount, in lawful money of the United States of America, for the payment of which sum well and truly to be made, we bind ourselves, our heirs, executors, administrators, successors, and assigns, jointly and severally, firmly by these presents.
THE CONDITION OF THIS OBLIGATION IS SUCH THAT, if the hereby bounded Principal shall not withdraw said bid within the period specified in the bidding specification, or, if no period be specified, for ninety (90) calendar days after the bid opening; or if the Principal does not attempt to withdraw the bid when the requirements of Public Contract Code §5101 et seq. are not met; or if the Principal is awarded a contract for the work by City and, within the time and in the manner required by the bidding specification , or if no period be specified, within ten (10) working days after the Contract is awarded, enters into the written form of contract included with bidding specification, furnishes the required bonds, one to guarantee faithful performance and the other to guarantee payment for labor and materials, and furnishes the required insurance coverages, then this obligation shall become null and void; otherwise, it shall be and remain in full force and effect.
In case suit is brought upon this bond, Surety further agrees to pay all court costs incurred by City in the suit and reasonable attorneys’ fees in an amount fixed by the court.
Surety, for value received, hereby stipulates and agrees that no change, extension of time for award of a contract after opening of bids, alteration, addition, modification, or supplement to the terms of the bidding documents, the work to be performed thereunder, or the Contract Documents shall in any way affect Surety’s obligations under this Bond, and Surety does hereby waive notice of any such change, extension of time, alteration, addition, modification or supplement to the terms of said Bidding Documents, the Work to be performed thereunder, or the Contract Documents. Surety hereby waives the provisions of California Civil Code §§ 2819, 2845, and 2849. City is an intended beneficiary of this bond and has all rights of a party thereto. [Text and signatures continued on page 2.]
08/11/2026 C11 165 of 436
54 IN WITNESS WHEREOF, this instrument has been duly executed by Principal and Surety, on the date set forth below, the name of each corporate party being hereto affixed, and these presents duly signed by its undersigned representative(s) pursuant to authority of its governing body.
Dated:
“Principal”
By: Signature
Name and Title
By: Signature
Name
(Seal)
“`Surety”
By: Signature
Name and Title
By: Signature
Name
(Seal)
This bond must be dated, all signatures must be notarized, and evidence of the authority of any person signing as attorney-in-fact must be attached.
08/11/2026 C11 166 of 436
55 CONSTRUCTION CONTRACT
THIS CONTRACT is made and entered into as of _____________________________ (“Contract Date”), by and between the City of Vista, a chartered municipal corporation (“Agency”), and Namex, status (“Contractor”). Agency and Contractor are sometimes individually referred to as a “Party” and collectively as “Parties.”
In consideration of the mutual covenants contained herein, Agency and Contractor agree as follows:
SECTION 1
The Contract Documents consisting of the PROJECT SPECIFICATIONS, comprised of the NOTICE INVITING BIDS, the INSTRUCTIONS TO BIDDERS, the accepted BID PROPOSAL; BID SCHEDULE; CONTRACTOR’S LICENSING STATEMENT; PROJECT REFERENCES; CONTRACTOR’S LIST OF SUBCONTRACTORS; CONTRACTOR’S CERTIFICATION ON FEDERAL CONTRACT REQUIREMENTS; CERTIFICATION REGARDING DEBARMENT, SUSPENSION, PROPOSED DEBARMENT, AND OTHER RESPONSIBILITY MATTERS; DISCLOSURE OF LOBBYING
ACTIVITIES AND INSTRUCTIONS FOR COMPLETION OF SF-LLL, DISCLOSURE OF LOBBYING ACTIVITIES; EQUAL EMPLOYMENT OPPORTUNITY CERTIFICATION; NON-SEGREGATED FACILITIES CERTIFICATION; NON-LOBBYING CERTIFICATION FOR FEDERAL-AID CONTRACTS; NON-COLLUSION DECLARATION (Federal Form); ; BID SECURITY FORM (WITH BID BOND, CASH, CERTIFIED CHECK OR CASHIER’S CHECK INCLUDED); the CONSTRUCTION CONTRACT, PAYMENT BOND, CONTRACTOR’S CERTIFICATE, SUPPLEMENTARY GENERAL PROVISIONS, SUPPLEMENTARY TECHNICAL PROVISIONS, Special Provisions, Plans, Standard Plans and Specifications; together with all additions, deletions, modifications, appendices, and all addenda (No. ___), as prepared prior to the date of bid opening setting forth any modifications or interpretations of any said documents, are hereby incorporated in and made a part of this Contract as fully as if set forth herein.
SECTION 2
For and in consideration of the payments and agreements to be made and performed by the Agency as set forth in said Contract Documents, the Contractor agrees with the Agency to construct
PROJECT
as specifically set forth in documents entitled
DOCUMENTS
for which award of the Contract was made, to furnish at his own proper cost and expense all plant, labor, services, materials, tools, equipment, supplies, transportation, utilities and all other items and facilities necessary therefore, as provided in the Contract Documents, and to do everything required therein. In accordance with the provisions of Section 3700 of the Labor Code, the Contractor will be required to secure the payment of Worker’s Compensation Insurance for its employees.
08/11/2026 C11 167 of 436
56 SECTION 3
For furnishing all said services and materials, payment of premiums on insurance policies, obtaining all permits and licenses of a temporary nature, furnishing and removing all plant, temporary work or structures, tools, and equipment, and for doing all the Work contemplated and embraced in this Contract, also for all loss and damage arising out of the nature of the aforesaid work during its progress or prior to acceptance from the action of the elements and from any unforeseen difficulties which may arise or be encountered in the prosecution of the Work, and for all other risks of any description connected with the Work, also for all expenses incurred by or in consequence of the suspension or discontinuance of work, except such as in the said Contract Documents are expressly stipulated to be borne by the Agency, and for well and faithfully completing the Work and the whole thereof within the stipulated time and in the manner shown and described in the said documents, and in accordance with the requirements of the Engineer under them, the Agency will pay, and the Contractor shall receive in full compensation therefore, the prices set forth by him in the accepted bid. The total compensation will be computed on the basis of the units of work actually performed in accordance with the requirements of the Contract Documents and paid for at the stipulated prices named in the BID SCHEDULE for completion of the Work.
SECTION 4
The Agency hereby promises and agrees with the said Contractor to employ, and does hereby employ the said Contractor to provide the materials and to do the Work according to the terms and conditions herein contained and referred to, for the price aforesaid, and hereby contracts to pay the same at the time, in the manner, and upon the conditions set forth in the Contract Documents, and the Parties for themselves, their heirs, executors, administrators, successors and assigns do hereby agree to the full performance of the covenants herein contained.
SECTION 5
Contractor agrees to indemnify, defend, and save harmless, the Agency, its officers, agents, employees and volunteers from and against any and all claims, demands, damages, losses and expenses, defense costs including attorney fees, or liability of any kind or nature which the Agency, its officers, agents and employees may sustain or incur or which may be imposed upon them for injury to or death of persons, or damage to property as a result of, arising out of, or in any manner connected with the Contractor’s performance under the terms of this Contract, caused in whole or in part by any negligent or willful acts or omission of the Contractor, any subcontractor, anyone directly or indirectly employed by any of them or anyone for whose acts any of them may be liable, except where caused by the active negligence, sole negligence, or willful misconduct of the Agency.
SECTION 6
Contractor agrees that the Payment Bond and Performance Bond attached to/submitted concurrently with this Contract are for reference purposes only, and shall not be considered a part of this Contract.
Contractor further agrees that said bonds are separate obligations of the Contractor and its surety, and that any attorneys’ fee provision contained in any payment bond or performance bond shall not apply to 08/11/2026 C11 168 of 436
57 this Contract. In the event there is any litigation between the Parties arising from the breach of this Contract, each Party will bear its own attorneys’ fees in the litigation.
SECTION 7
Contractor agrees to abide by all required contract provisions of federal-aid construction contracts per Exhibit A, which is hereby incorporated in and made a part of this Contract as fully as if set forth herein.
Contractor agrees to pay generally prevailing wages per the Federal Prevailing Wage Rate Determination as provided in Exhibit B or pursuant to California law (8 CCR § 16001) where California prevailing wage rates are higher than the applicable federal rate.
IN WITNESS WHEREOF, the Parties have caused this Contract to be executed as of the Contract Date.
CITY OF VISTA, a chartered municipal
corporation
By:
JOHN FRANKLIN, MAYOR
ATTEST:
KATHY VALDEZ, CITY CLERK
By:
APPROVED AS TO FORM:
WALTER CHUNG, CITY ATTORNEY
By:
RISK MANAGEMENT REVIEW:
ANALISA HOLBROOK, RISK MANAGER
By:
NAMEX, status
By:
Name/Title
By:
Name/Title
08/11/2026 C11 169 of 436
58 Bond No.
Premium: $
Effective Date:
PERFORMANCE BOND
LD; GP; DWG
APN
KNOW ALL PERSONS BY THESE PRESENTS that:
The City of Vista (“City”) has awarded a contract (the “Contract”) to THEPRINCIPAL (“Principal”) for the work described as follows:
Work Description,
which Contract, and all Contract Documents set forth therein, are incorporated herein and made a part thereof by this reference.
Principal is required under the terms of the Contract to furnish a bond guaranteeing the prompt, full, and faithful performance of the Contract concurrently with delivery of the signed Contract to City.
NOW, THEREFORE, we, the undersigned Principal, and
,
(Name, address, and telephone number of Surety)
(“Surety”) a duly admitted surety insurer under the laws of the State of California, as Surety, are held and firmly bound unto City in the penal sum of amount Dollars ($xxx), this amount being not less than one hundred percent (100%) the total contract price, in lawful money of the United States of America, for the payment of which sum well and truly to be made, we bind ourselves, our heirs, executors, administrators, successors, and assigns, jointly and severally, firmly by these presents.
THE CONDITION OF THIS OBLIGATION IS SUCH THAT, if the hereby bounded Principal, his, her or its heirs, executors, administrators, successors or assigns, shall in all things stand to and abide by, and well and truly keep and perform all the undertakings, terms, covenants, conditions and agreements in the Contract and any alteration thereof made as therein provided, on Principal’s part to be kept and performed, all within the time and in the manner therein specified, and in all respects according to their true intent and meaning, and shall indemnify and hold harmless City and its officers, agents, and others as therein provided, from any and all losses, liability and damages, claims, judgments, stop payment notices, costs, and fees of every description, whether imposed by law or equity, which may be incurred by City by reason of the failure or default on the part of Principal in the performance of any or all of the terms or the obligations of the Contract Documents, as they may be amended and supplemented including, but not limited to, Principal’s liability for City’s damages (including direct and consequential damages incurred by City for: rental expenses; losses of use, income, profit, business, and reputation; increased financing costs; and loss of management or employee productivity or of the services of such persons) caused by Principal’s delays, as well as Principal’s liability for other delay damages or liquidated damages, and any warranties or guarantees required thereunder; then this obligation shall become null and void; otherwise, it shall be and remain in full force and effect.
When City declares that Principal is in default under the Contract, Surety shall promptly, take one of the following actions:
(a) Remedy the default;
(b) Undertake through its agents or independent contractors reasonably acceptable to City, to complete the Project according to the Contract Documents’ terms and conditions then in effect including without limitation, all obligations with respect to warranties, guarantees, and the payment of liquidated damages; or, if required by City;
08/11/2026 C11 170 of 436
59 (c) Obtain a bid or bids for completing the Contract in accordance with its terms and conditions using a procurement methodology approved by City, select a contractor or contractors — acceptable to City — to complete all of the Work, and arrange for a contract between the contractor(s) and City, to be secured with performance and payment bonds executed by an admitted surety insurer equivalent to the bonds issued on the Construction Contract, and Surety shall make available, as the Work progresses, sufficient funds to pay the cost of completion less the balance of the Contract Sum, and to pay and perform all obligations of Principal under the Contract and Contract Documents, including other costs and damages for which Surety is liable under this Bond and all obligations with respect to warranties, guarantees, and the payment of liquidated damages as a result of Contractor’s default; (d) Waive its right to perform and complete, arrange for completion, or obtain a new contractor and with reasonable promptness under the circumstances:
(i) After investigation, determine the amount for which it may be liable to City and, as soon as practicable after the amount is determined, make payment to City; or (ii) Deny liability in whole or in part and notify City, citing the reasons for denial.
If Surety does not proceed as provided above with reasonable promptness, Surety shall be deemed to be in default on this Bond seven days after receipt of an additional written notice from City to Surety demanding that Surety perform its obligations under this Bond, and City shall be entitled to enforce any remedy available to City. If Surety admits liability and tenders payment, and City refuses the payment, or Surety has denied liability, in whole or in part, without further notice City shall be entitled to enforce any remedy available to City.
In case suit is brought upon this bond, Surety further agrees to pay all court costs and reasonable attorneys’ fees in an amount fixed by the court. Principal and Surety agree that this Performance Bond shall not be considered a part of the Contract but rather is a separate obligation of Principal and its Surety, and that any attorneys’ fee provision contained in this Performance Bond shall not apply to the Contract. In the event there is any litigation between the parties arising from the breach of the Contract, each party will bear its own attorneys’ fees in the litigation.
FURTHER, Surety, for value received, hereby stipulates and agrees that no change, extension of time, alteration, addition or modification to the terms of the Contract, or of the work to be performed thereunder, or the specifications for the same, shall in any way affect its obligations under this bond, and it does hereby waive notice of any such change, extension of time, alteration, addition, or modification to the terms of the Contract or to the work or to the specifications thereunder. Surety hereby waives the provisions of California Civil Code §§ 2819, 2845, and 2849.
City is an intended beneficiary of this bond and has all rights of a party thereto. [Text and signatures continued on page 3.]
08/11/2026 C11 171 of 436
60 IN WITNESS WHEREOF, two (2) identical counterparts of this instrument, each of which shall for all purposes be deemed an original hereof, have been duly executed by Principal and Surety, on the date set forth below, the name of each corporate party being hereto affixed and these presents duly signed by its undersigned representative(s) pursuant to authority of its governing body.
Dated:
“Principal”
THEPRINCIPAL
By: Signature
Name and Title
By: Signature
Name
(Seal)
“`Surety”
By: Signature
Name and Title
By: Signature
Name
(Seal)
This bond must be dated, all signatures must be notarized, and evidence of the authority of any person signing as attorney-in-fact must be attached.
08/11/2026 C11 172 of 436
61 Bond No.
Premium: $
Effective Date:
PAYMENT BOND
(LABOR AND MATERIALS)
LD; GP; DWG
APN
KNOW ALL PERSONS BY THESE PRESENTS that:
The City of Vista (“City”) has awarded a contract (the “Contract”) to THEPRINCIPAL (“Principal”) for the work described as follows:
Work Description,
which Contract, and all Contract Documents set forth therein, are incorporated herein and made a part thereof by this reference.
Principal is required under the terms of the Contract and the California Civil Code to furnish a bond to secure the prompt, full, and faithful payment of any Claimant, as hereinafter defined, for all labor, materials or services used or reasonably required for use in the performance of the work, concurrently with delivery to City of the signed Contract.
NOW, THEREFORE, we, the undersigned Principal, and
,
(Name, address, and telephone number of Surety)
(“Surety”) a duly admitted surety insurer under the laws of the State of California, as Surety, are held and firmly bound unto City in the penal sum of amount Dollars ($xxx), this amount being not less than one hundred percent (100%) of the total contract price, in lawful money of the United States of America, for the payment of which sum well and truly to be made, we bind ourselves, our heirs, executors, administrators, successors, and assigns, jointly and severally, firmly by these presents.
THE CONDITION OF THIS OBLIGATION IS SUCH THAT, if the hereby bounded Principal, his, her or its heirs, executors, administrators, successors or assigns, or subcontractors shall fail to pay any of the persons named in Division 4, Part 6, Title 3 of the California Civil Code (§ 9000 et seq.), or any amounts due under the Unemployment Insurance Code with respect to work or labor performed under the Contract, or for any amounts required to be deducted, withheld, and paid over to the Employment Development Department from the wages of employees of Principal and subcontractors pursuant to Section 13020 of the Unemployment Insurance Code, with respect to work or labor performed under the Contract (“Claimants”), Surety will pay for the same in an amount not exceeding the penal sum specified in this bond; otherwise, this obligation shall become null and void.
This bond shall inure to the benefit of any of the persons named in Division 4, Part 6, Title 3 of the California Civil Code (§ 9000 et seq.), so as to give a right of action to such persons or their assigns in any suit brought upon the bond.
In case suit is brought upon this bond to enforce or interpret this bond’s terms, Surety further agrees to pay all court costs and reasonable attorneys’ fees in an amount fixed by the court. Principal and Surety agree that this Performance Bond shall not be considered a part of the Contract but rather is a separate obligation of Principal and its Surety, and that any attorneys’ fee provision contained in this Performance Bond shall not apply to the Contract.
In the event there is any litigation between the parties arising from the breach of the Contract, each party will bear its own attorneys’ fees in the litigation.
FURTHER, Surety, for value received, hereby stipulates and agrees that no change, extension of time, alteration, addition or modification to the terms of the Contract, or of the work to be performed thereunder, or the specifications for the same, shall in any way affect its obligations under this bond, and it does hereby waive notice of any such change, extension of time, alteration, addition, or modification to the terms of the Contract or to the work or to the specifications thereunder. Surety hereby waives the provisions of California Civil Code §§ 2819, 2845, and 2849.
City is an intended beneficiary of this bond and has all rights of a party thereto.
08/11/2026 C11 173 of 436
62 IN WITNESS WHEREOF, this instrument has been duly executed by Principal and Surety, on the date set forth below, the name of each corporate party being hereto affixed and these presents duly signed by its undersigned representative(s) pursuant to authority of its governing body.
Dated:
“Principal”
THEPRINCIPAL
By: Signature
Name and Title
By: Signature
Name
(Seal)
“`Surety”
By: Signature
Name and Title
By: Signature
Name
(Seal)
This bond must be dated, all signatures must be notarized, and evidence of the authority of any person signing as attorney-in-fact must be attached.
08/11/2026 C11 174 of 436
63 CONTRACTOR'S CERTIFICATE
NORTH INDIANA AVENUE SIDEWALK IMPROVEMENTS (C.I.P. No. 8402B)
CONTRACTOR'S CERTIFICATE PURSUANT TO
SECTION 1861 OF THE LABOR CODE
I am aware of the provisions of Section 3700 of the Labor Code that requires every employer to be insured against liability for Worker's Compensation or to undertake self-insurance in accordance with the provisions of that Code, and I will comply with such provisions before commencing the performance of the Work of this Contract.
___________________________________
Name of Contractor
By: ________________________________
Signature
___________________________________
Printed Name
___________________________________
Title
___________________________________
Date
By: ________________________________
Signature
___________________________________
Printed Name
___________________________________
Title
___________________________________
Date
08/11/2026 C11 175 of 436
64 NON-COLLUSION DECLARATION FOR SUBCONTRACTORS
NORTH INDIANA AVENUE SIDEWALK IMPROVEMENTS (C.I.P. No. 8402B)
TO BE EXECUTED BY EACH AWARDEE OF A SUBCONTRACT
The undersigned declares:
I am the __________________ of _________________________________, the party making the foregoing bid. (Title) (Company Name)
The bid is not made in the interest of, or on behalf of, any undisclosed person, partnership, company, association, organization, or corporation. The bid is genuine and not collusive or sham. The bidder has not directly or indirectly induced or solicited any other bidder to put in a false or sham bid. The bidder has not directly or indirectly colluded, conspired, connived, or agreed with any bidder or anyone else to put in a sham bid, or to refrain from bidding. The bidder has not in any manner, directly or indirectly, sought by agreement, communication, or conference with anyone to fix the bid price of the bidder or any other bidder, or to fix any overhead, profit, or cost element of the bid price, or of that of any other bidder. All statements contained in the bid are true. The bidder has not, directly or indirectly, submitted his or her bid price or any breakdown thereof, or the contents thereof, or divulged information or data relative thereto, to any corporation, partnership, company, association, organization, bid depository, or to any member or agent thereof, to effectuate a collusive or sham bid, and has not paid, and will not pay, any person or entity for such purpose.
Any person executing this declaration on behalf of a bidder that is a corporation, partnership, joint venture, limited liability company, limited liability partnership, or any other entity, hereby represents that he or she has full power to execute, and does execute, this declaration on behalf of the bidder. The provisions of this declaration shall not be held as disqualifying a person, firm or corporation who has submitted a sub-proposal to one bidder from submitting separate sub-proposals or quoting prices for materials or work to other bidders.
I declare under penalty of perjury under the laws of the State of California that the foregoing is true and correct and that this declaration is executed on
________________________, at ________________________________, ___________________________.” (Date) (City) (State)
________________________________________
Signature
________________________________________
Printed Name
________________________________________
Title
08/11/2026 C11 176 of 436
65 SUPPLEMENTARY GENERAL PROVISIONS
NORTH INDIANA AVENUE SIDEWALK IMPROVEMENTS (C.I.P. No. 8402B)
This section makes additions, deletions, or revisions to PART 1 – GENERAL PROVISIONS of the 2024 Standard Specifications for Public Works Construction (“Greenbook”). All sections and subsections which are not changed remain in full force and effect.
SECTION 1 – GENERAL, TERMS, DEFINITIONS,
ABBREVIATIONS, UNITS OF MEASURE AND SYMBOLS
1-1 GENERAL.
Add the following paragraphs to this subsection:
The terms “as shown,” “as indicated,” or “as specified” are understood to be followed by the phrase “in the Contract Documents.”
Working titles having a masculine gender, such as “workman” and “journeyman” and the pronoun “he,” are used in the Specifications for the sake of brevity, and are intended to refer to persons of either gender.
1-2 TERMS AND DEFINITIONS.
Modify the following terms and definitions to read as follows:
Agency or City or Owner - The legal entity for which the Work is being performed, either the City of Vista, the Vista Community Development Commission, or the Buena Sanitation District.
Board – Where the word Board appears in the Standard Specifications, it shall mean the officer or body constituting the awarding authority of the Agency, either the City Council of the City of Vista, the Commission of the Vista Community Development Commission, or the Board of the Buena Sanitation District.
Special Provisions - Means the Supplementary General Provisions and Technical Provisions of the Project Specifications.
Standard Plans or Standard Drawings - Means the most recent editions of the Standard Drawings of the City of Vista and the San Diego Regional Standard Drawings (SDRSD), unless otherwise noted.
The City of Vista Standard Drawings takes precedence over the San Diego Regional Standard Drawings.
Specifications or Standard Specifications - The Standard Specifications of the Agency are the latest edition of the Standard Specifications for Public Works Construction (“Greenbook”), as written and 08/11/2026 C11 177 of 436
66 promulgated by Public Works Standards, Inc., together with the most current Cumulative Supplement adopted by the Greenbook Committee of Public Works Standards, Inc. and along with the latest San Diego Regional Supplement to “Greenbook” as approved and adopted by the San Diego Regional Standards Committee.
The Standard Specifications set forth above will control the general provisions, construction materials, and construction methods for this contract, except as amended by the Plans, Special Provisions, or other Contract Documents. The Special Provisions are supplemental to the provisions of the Standard Specifications, unless otherwise noted. Only those sections requiring elaborations, amendments specifying options, additions or deletions are called out.
Working Day - Modify c) as follows:
The Agency recognizes ten (10) holidays on which no work is to be scheduled, as follows:
HOLIDAY OBSERVED ON
New Year’s Day January 1
Martin Luther Day, Jr. Day 3rd Monday in January
President’s Day 3rd Monday in February
Memorial Day Last Monday in May
Independence Day July 4
Labor Day 1st Monday in September
Veteran’s Day November 11
Thanksgiving Day 4th Thursday in November
The day after Thanksgiving Friday after 4th Thursday in November Christmas Day December 25
Add the following new terms and definitions to this subsection:
Acceptance – Formal action of the Agency in determining that the Contactor’s Work has been completed in accordance with the Contract, filing a Notice of Completion with the County Recorder, which stipulates that date that the Work was completed, and notifying the Contractor in writing of the acceptability of the Work.
Award of Contract (Award) – Date of – Date on which the Mayor or designee executes the Contract.
ASTM Designations – The latest revised Specifications or tentative Specifications of the American Society for Testing and Materials.
Best Management Practices (BMPs) – (a) A measure implemented to protect water quality and reduce the potential for pollution (associated with storm water runoff); (b) Any program, technology, process, siting criteria, operating method, measure, or device that controls, prevents, removes, or reduce pollution.
CA MUTCD – California Manual on Uniform Traffic Control Devices.
08/11/2026 C11 178 of 436
67 Disadvantaged Business Enterprise (DBE) - A for-profit “small business concern” that is at least fifty- one percent (51%) owned and controlled by one or more socially and economically disadvantaged individuals certified by the California Department of Transportation (Caltrans).
Inspector – The engineering or technical personnel authorized to act as agents for the Engineer in the supervision of work covered by these Specifications, limited to the particular duties entrusted to them.
Main or Trunkline Facility - An Owner owned and maintained principal subsurface conduit that collects sewage or storm drainage, or distributes potable water.
Material and Labor Bond - The Payment Bond as defined in the Civil Code of California relating to Payment Bond for Public Works.
Notice of Completion (NOC) – A document the Agency will file with the County Recorder, if in the Agency’s judgment, the Work has been completed. NOC stipulates the date that the Engineer accepted the Work. See California Civil Code section 3093.
Portable Emissions Unit - Any type of portable equipment which may discharge air contaminants into the atmosphere as stated in the San Diego County Air Pollution Control District Rules and Regulations.
Project - Means the total construction of all improvements located on the Site identified in the plan drawings and contractual documents.
Project Specifications - Comprised of the Notice Inviting Bids, the Instructions to Bidders, the BID documents, the Contract Documents, the Special Provisions, which include the Supplementary General Provisions and the Technical Provisions, permits issued by jurisdictional regulatory agencies, all appendices, the Standard Specifications, and all reference Specifications.
Punchlist – List of incomplete items of Work and of items of Work that are not in conformance with the Contract.
1-3 ABBREVATIONS.
1-3.2 Common Usage.
Add the following abbreviations to this subsection:
AC .................... ........................ Asphalt Concrete AT&T ................ ........................ Local and long distance telephone company (formerly SBC and Pacific Bell)
CGP ................. ........................ Construction General Permit LUP .................. ........................ Linear Underground / Overhead Project NCTD ............... ........................ North County Transit District OSHA ............... ........................ Occupational Safety and Health Administration (Department of Labor) PCR ................. ........................ Point of curb return 08/11/2026 C11 179 of 436
68 SWMP ............. ........................ Storm Water Management Plan VID................... ........................ Vista Irrigation District WPCP .............. ........................ Water Pollution Control Plan WDID ............... ........................ Waste Discharge Identification Number
1-3.3 Institutions.
Add the following institutions to this subsection:
APWA ............... ........................ American Public Works Association SDRWQCB ....... ........................ California Regional Water Quality Control Board, San Diego Region
1-7 AWARD AND EXECUTION OF CONTRACT.
Modify this subsection to read as follows:
1-7 AWARD AND EXECUTION OF CONTRACT. Award and Execution of Contract shall be as provided for in the Project Specifications, Notice Inviting Bids, Instructions to Bidders, or the Specifications.
For projects with a value of $150,000 and less, the City Manager is authorized to award the Contract and the Agency will send a “Notice of Intent to Award” to the Contractor accepting the Bidder’s proposal. Within ten (10) Working Days of the date of this notification, the Contractor shall submit the completed “Agreement and Bonds” portion of the Contract and the insurance certificates. The City Manager will then execute the Contract for the Agency.
For projects with a value greater than $150,000, the City Council will award the Contract. The Agency will send a “Notice of Intent to Award” to the Contractor. Within ten (10) Working Days of the date of this notice, the Contractor shall submit the completed “Agreement and Bonds” portion of the Contract and the insurance certificates. After the City Council approves the Contract, the Mayor will execute the Contract for the Agency.
1-7.3 Integration.
Add the following new subsection:
1-7.3 Integration. Oral Modifications Ineffective. No oral order, objection, direction, claim or notice by any party or person shall affect or modify any of the terms or obligations contained in the Contract Documents.
1-7.4 Change in Name and Nature of Contactor’s Legal Entity.
Add the following new subsection:
08/11/2026 C11 180 of 436
69 1-7.4 Change in Name and Nature of Contactor’s Legal Entity. Should a change be contemplated in the name or nature of the Contractor’s legal entity, the Contractor shall first notify the Agency in order that proper steps may be taken to have the change reflected on the Contract.
SECTION 2 – SCOPE OF THE WORK
2-1 WORK TO BE DONE.
Add the following paragraphs to this subsection:
The Contractor shall supervise and direct the Work, using the Contractor’s best skill and attention.
The Contractor shall be solely responsible for all construction means, methods, techniques, sequences and procedures relating to the Work, and shall coordinate all portions of the Work under the contract, including the relations of the various trades to the progress of the Work, in accordance with these provisions.
The Contractor shall be responsible to the Agency for the acts and omissions of the Contractor’s employees, subcontractors and their agents and employees, and any other persons performing any of the Work under a Contract with the Contractor.
Any plan or method suggested to the Contractor by the Engineer but not specified or required, if adopted or followed in whole or in part, shall be used at the risk and responsibility of the Contractor; and the City and the Engineer will assume no responsibility therefore.
Nothing in these specifications shall be interpreted to make the Contractor an agent of the Agency.
Unless otherwise provided in these specifications, the Contractor shall provide and pay for furnishing all labor, materials, equipment, tools, implements, construction equipment and machinery, methods or processes, water, heat, utilities, transportation, and other facilities, services and incidentals necessary for the proper execution and completion of the Work, whether temporary or permanent and whether or not incorporated or to be incorporated in the Work. Contractor shall leave the construction site in a neat, clean, and orderly condition upon completion of the Work.
2-2 PERMITS.
Add the following paragraphs to this subsection:
The issuance of a permit based on Plans, specifications, and other data shall not prevent the Agency from ordering correction of errors in said Plans, specifications, or other data, or from preventing construction operations being carried on hereunder when in violation of any law, code or ordinance.
The Contractor shall submit to the Engineer for review and approval a completed City of Vista Storm Water Management Permit application (see Appendices or contact the Agency for forms and instructions). As part of the permit application, the Contractor must submit a Storm Water Pollution Prevention Plan (SWPPP) to the Engineer for review and acceptance as required by the Regional Water 08/11/2026 C11 181 of 436
70 Quality Control Board. The Contractor shall comply with all provisions of the permit throughout the course of the Work. The permit must be approved by the Engineer prior to starting work. The Contractor shall include all costs for obtaining and complying with the requirements of the permit in the various items of work, and no additional compensation will be paid.
Compliance with the provisions of this section shall be considered as included in the various Contract items of work to which such regulations are applicable and no additional compensation shall be allowed therefore. Further, the enforcement of any requirements of the permits required during the performance of the Contract work shall not be made the basis for additional compensation.
If the Contractor is required to obtain permit(s) from other agency (agencies) to complete the Work in accordance with the Drawings and Project Specifications, the Agency will compensate the Contractor for the actual cost of the permit fee unless otherwise specified that the Contractor is responsible to pay the fee. The Contractor shall include all other costs associated with obtaining permits in various bid items for which the permit is required, and no additional compensation will be paid.
2-2.1 City of Vista Business License.
Add the following new subsection:
2-2.1 City of Vista Business License. A City of Vista Business License is required of the Contractor and all his/her Subcontractors prior to execution of the Contract. A fee will be charged for any new Business Licenses or renewal of any expired Business Licenses.
2-2.2 City of Vista No-Fee Construction Permit.
Add the following new subsection:
2-2.2 City of Vista No-Fee Construction Permit. After execution of the Contract and prior to beginning work, the Contractor shall apply for and obtain a no-fee Construction Permit from the Agency.
Prior to applying for the permit, the Contractor shall first submit the following documents to the Engineer with proof that the policies / licenses are current:
1] Contractor’s License of appropriate classification.
2] City of Vista Business License [see Subsection 2-2.1 (“City of Vista Business License.”)]
3] General Liability Insurance Certificate. The Certificate shall be issued with the Agency listed as the Certificate Holder. The Agency shall also be listed as an additional insured. See the Supplementary General Provisions for additional Certificate requirements and the amounts and types of liability coverage. If any Subcontractor does not have the amount of liability insurance required in the Project Specifications, the General Contractor must produce evidence that the Subcontractor's work is covered by the General Contractor's liability insurance policy.
08/11/2026 C11 182 of 436
71 4] Worker's Compensation Insurance Certificate. The Certificate shall be issued with the Agency listed as the Certificate Holder.
5] Waste Management Permit Application. The Contractor shall be required to recycle at least fifty percent (50%) of the generated waste in accordance with Vista Municipal Code Chapter
13.17. A permit will be issued by the Agency to the Contractor covering the Contractor and all Subcontractors.
2-3 RIGHT-OF-WAY.
Add the following paragraphs to this subsection:
The Contractor shall not allow his employees to use private property for any reason or to use water or electricity from such property without written permission from the owner. The Contractor shall provide evidence of such permission in writing to the Engineer before entering upon such lands. In performing any work or doing any activity on lands outside the public rights-of-way, the Contractor shall comply with all applicable Federal, state and local laws, ordinances, codes and regulations. The Contractor shall indemnify and hold the Agency, its officials, officers, employees, and agents free and harmless from all claims or suits for damages occasioned by such work or activity, whether done according to this subsection and with permission from the owner or in violations of this subsection without permission from the owner.
For all projects the Contractor shall be fully responsible for locating and obtaining permission to use construction storage area(s) and stockpile site(s) in addition to staging areas provided by the Agency. Where the Contractor may find it advantageous to use private property, it shall arrange for its use. The Contractor shall assume full responsibility for its rental, preparation, maintenance and cleanup in a manner satisfactory to the Agency and the property owner.
2-4 COOPERATION AND COLLATERAL WORK.
Replace the first paragraph in this subsection with the following:
Nothing contained in these documents shall be interpreted as granting to the Contractor exclusive occupancy of the construction site for the Work. Should construction be under way or subsequently begun by other forces or by other contractors within or adjacent to the limits of the Work, or in the vicinity of the Work to be done under this Contract, the Contractor shall so conduct his operations as to interfere to the least possible extent with the Work of such other forces or contractors. If the performance of this Contract is likely to be interfered with by the simultaneous performance of some other forces or contractors, the Engineer will decide which contractor shall continue or whether the Work can proceed simultaneously.
Any difference or conflicts that may arise between the Contractor and such other forces or contractors because of delays or hindrance to each other, shall be adjusted and determined by the Engineer. If the Work of the Contractor is delayed because of any acts or omissions of any other contractor or force, the 08/11/2026 C11 183 of 436
72 Contractor shall on that account have no claim for additional compensation or extra cost against the Agency.
Add the following paragraphs to this subsection:
The Contractor shall perform the Work in such a manner as to maintain in operation all existing utilities and other public services. The Contractor shall allow operations and maintenance crews from any utility or other public service agency to access their facilities at any time. Owners of the various utilities, and / or facilities at or near the Project site are as follows:
UTILITY OWNER
Gas and Electric Power Transmission and
Distribution Facilities
San Diego Gas & Electric Company
(SDG&E)
Telephone and Communication Facilities AT&T Corporation Cable Television and / or Communication
Facilities
Cox Communications, Inc. , Times Warner
Cable, Crown Castle and/or Coastal
Sewer City of Vista Public Works and Buena
Sanitation District
Traffic Signals, Street Lights, and Fiber Optic
Communication Facilities City of Vista Public Works
Storm Drains City of Vista Public Works
Well Water Distribution or Irrigation City of Vista Public Works Water Vista Irrigation District (VID)
Bus / Railroad North County Transit District (NCTD)
State Highways California Department of Transportation
(Caltrans), District 11
For the NORTH INDIANA AVENUE SIDEWALK IMPROVEMENTS, the following coordination and scheduling information is provided for the Contractor’s information.
1] The Contractor shall contact SDG&E, AT&T, Charter and Cox Communication, at least 2 weeks prior to final paving date to allow them the opportunity to locate their valves, vaults, manholes, and other structures, to facilitate them adjusting their utility appurtenances to grade after the contractor completes the final AC surface course paving.
2] The Contractor shall contact VID at least 2 weeks in advance of starting any work on the project, and coordinate the project schedule with them throughout the project, to facilitate them scheduling their crews to raise valve covers at the same time the Contractor is placing the final AC surface course paving.
2-5 THE CONTRACTOR’S EQUIPMENT AND FACILITIES.
2-5.1 General.
Replace the second paragraph in this subsection with the following paragraph:
08/11/2026 C11 184 of 436
73 The Contractor shall provide his own sanitary accommodations, including enclosed portable toilets and hand washing stations, for the convenience of the workers on the Project. The accommodations shall be regularly maintained by a company that specializes in providing and maintaining those facilities. The Contractor shall ensure that all workers on the Project, including those of subcontractors, use the Contractor’s accommodations and do not use any public or private facilities while working on the Project.
Add the following paragraphs to this subsection:
The Contractor must furnish adequate equipment to properly perform the Work in a workmanlike manner. Such equipment must be in good state of repair and maintained in such state during the progress of the Work. No worn or obsolete equipment shall be used, and in no case shall the maker’s rating of capacity for any equipment be exceeded. Equipment not suitable to produce the quality or work required for this Project will not be permitted to operate. Such equipment and facilities shall meet all requirements of applicable ordinances and laws.
All construction equipment, stationary or mobile, shall be equipped with properly operated and maintained muffler exhaust systems. Stockpiling in vehicle staging area shall be located as far as practical from occupied dwelling units and shall be subject to approval by the Engineer.
Full compensation for conforming to the requirements of this provision shall be considered as included in the Contract price paid for various items of work and no additional compensation will be allowed therefore.
2-5.2 Temporary Utility Services.
Add the following paragraph to this subsection:
The Contractor may contact Vista Irrigation District (VID) to obtain a construction water meter and determine all terms, costs, conditions, and regulations imposed on the Contractor for use thereof.
Contractor will be required to pay for usage of water through construction water meter.
If VID does not have a construction water meter available, the Contractor shall use a water truck or other water storing equipment for use on the project and obtain water from offsite. Water can be obtained from the Public Works Yard at 1165 East Taylor Street, or at Vista Sports Park at 1630 Sports Park Way
2-6 CHANGES REQUESTED BY THE CONTRACTOR.
Add the following paragraph to this subsection:
The Contractor shall give written notice of a proposed Change Order required for compliance with the Contract Documents within seven (7) Working Days of discovery of the facts giving rise to the proposed Change Order.
08/11/2026 C11 185 of 436
74 2-6.1 Cost Reduction Proposal.
Add the following new subsection:
2-6.1 Cost Reduction Proposal. The Contractor may submit to the engineer in writing, proposals for modifying the Plans, Specifications, or other requirements of the Contract for the sole purpose of reducing the total cost of construction.
The cost reduction proposal must not impair, in any manner, the essential functions or characteristics of the Project such as service life, economy of operation, ease of maintenance, desired appearance, or design and safety standards.
The Contractor shall include the following information in the cost reduction proposal:
a) A description of both the existing Contract requirements for performing the work and the proposed changes.
b) An itemization of the Contract requirements that must be changed if the proposal is adopted. c) A detailed estimate of the cost of performing the work under the existing Contract and under the proposed change.
d) A statement of the time within which the engineer must make a decision thereon. e) The Contract items of Work affected by the proposed changes, including any quantity variation attributable thereto.
These provisions of this subsection do not require the Engineer to consider any cost reduction proposal which may be submitted hereunder; nor will the Agency be liable to the Contractor for failure to accept or act upon any cost reduction proposal the Contractor has submitted pursuant to this subsection, nor for any delays to the Work attributable to any such proposal.
If a cost reduction proposal is similar to the information included in the Contract Documents or adopted by the Agency after the advertisement for the Contract, the Engineer will not accept such proposal and reserves the right to make such changes without compensation to the Contractor under the provisions of this subsection.
The Contractor must continue to perform the Work in accordance with the requirements of the Contract until a Change Order, incorporating the cost reduction proposal has been issued. If a Change Order has not been issued by the date upon which the Contractor’s cost reduction proposal specified that a decision thereon should be made, or such other date as the Contractor may subsequently have specified in writing, such cost reduction proposal must be deemed rejected.
The Engineer is the sole judge of the acceptability of a cost reduction proposal and the estimated net savings. In determining the estimated net savings, the Agency has the right to disregard the Contract Bid prices if, in the judgment of the Engineer, such prices do not represent fair measure of the value of the work to be performed or to be deleted.
The Agency reserves the right, where it deems such action appropriate, to require the Contractor to share in the Agency’s costs of investigating the Contractor’s cost reduction proposal as a condition of considering such proposal. Where such a condition is imposed, the Contractor shall indicate his 08/11/2026 C11 186 of 436
75 acceptance in writing allowing the Agency to deduct amounts payable to the Contractor for any monies due or that may become due to the Contractor under the Contract.
If the Engineer accepts your cost reduction proposal in whole or in part, the Engineer will issue a Change Order to incorporate the changes in the Plans and Specifications which are necessary to permit the cost reduction proposal, or such part of it as has been acceptable to be put into effect. If the Engineer’s approval is conditional, the Change Order will include any conditions upon which the Engineer’s approval is based.
The Change Order shall also include the estimated net savings in the cost of performing the Work due to the accepted cost reduction proposal and provides that the Contract cost be adjusted by crediting the Agency with fifty percent (50%) of estimated net savings amount.
The Contract time will not be extended by the acceptance of the cost reduction proposal and performance of the Work unless specified otherwise in the Change Order.
The amount specified as payable to the Contractor in the Change Order is full compensation for the cost reduction proposal and the performance of the Work.
The Agency expressly reserves the right to adopt a cost reduction proposal for general use on contracts administered by the Agency when it determines that said proposal is suitable for application to other contracts. When an accepted cost reduction proposal is adopted for general use, only the Contractor who first submitted such proposal will be eligible for compensation subject to this subsection, and in that case, only for contracts awarded prior to submission of the accepted cost reduction proposal.
The cost reduction proposals identical or similar to previously submitted proposals will be eligible for consideration and compensation under the provisions of this subsection, if the identical or similar, previously submitted proposal were not adopted for general application to other contracts administered by the Agency.
Subject to the provisions contained herein, the Agency must have the right to use all or any part of any submitted cost reduction proposal without obligation or compensation of any kind to the Contractor.
The Contractor must bear all costs to revise bonds for the Project to include the cost reduction incentive proposal Work.
2-7 CHANGES INITIATED BY THE AGENCY.
2-7.1 General.
Add the following paragraph to this subsection:
Contractor shall not be entitled to claim or bring suit for damages, whether for loss of profits or otherwise, on account of any change resulting in a decrease or omission of any item or portion of work to be done. Whenever any change is made as provided for herein, such change shall be considered 08/11/2026 C11 187 of 436
76 and treated as though originally included in the Contract, and shall be subject to all terms, conditions and provisions of the original Contract.
2-8 EXTRA WORK.
Add the following paragraphs to this subsection:
Any Extra Work performed by the Contactor without an approved Contract Change Order from the engineer shall be at the Contractor’s risk and the Contractor shall not be entitled to payment without an approved Change Order. All Extra work shall be adjusted daily upon report sheets furnished by the Contractor, reviewed by the Engineer and signed by both parties. The daily report shall be considered thereafter as the true record of Extra Work done. New and unforeseen work will be classed as Extra Work only when said work is not covered and cannot be paid for under any of the various items or combination of items for which a bid price appears in the Bid Forms.
The Agency reserves the right to direct the Contractor to solicit competitive Bids for Extra work. If required by the Engineer, you must obtain competitive Bids from Subcontractor acceptable to the Contractor and must deliver such Bids to the Engineer who will then determine which Bids will be accepted.
Any request by the Contractor to change the Contract Price to include the price of Extra Work must be by written notice to the Engineer and must include itemized estimates. The Contractor’s itemized estimates must detail all applicable elements of price (e.g. labor and payroll costs, quantities, crew composition, production rates, material costs, Subcontractor and Supplier costs, equipment costs, and supplemental costs).
If the Contractor’s request to change the Contract Price arises from changes in the Schedule affecting all or part of the Project, or if the Contractor seeks a change in the Contract time, the Contractor’s request must include the analysis require by Subsection 6-1 (“CONSTRUCTION SCHEDULE AND COMMENCEMENT OF THE WORK.”).
SECTION 3 – CONTROL OF WORK
3-1 ASSIGNMENT.
Add the following paragraph to this subsection:
In accordance with Section 4551 of the Government Code, the Contractor and subcontractors shall conform to the following requirements. In entering into a public works contract or a subcontract to supply goods, services or materials pursuant to a public works contract, the Contractor or subcontractor offers and agrees to assign to the awarding body all rights, title and interest in and to all causes of action it may have under Section 4 of the Clayton Act (15 U.S.C. Sec. 15) or arising from purchases of goods, services or materials pursuant to the public works Contract or the subcontract.
This assignment shall be made and become effective at the time the awarding body tenders final payment to the Contractor, without further acknowledgment by the parties. 08/11/2026 C11 188 of 436
77 3-3 SUBCONTRACTORS.
Replace the first paragraph in this subsection with the following:
The Contractor shall give personal attention to the fulfillment of the Contract. The Contractor shall keep the Work under its control. Subcontractors shall be considered employees of the Contractor. The Contractor shall be fully responsible for the acts and omissions of its subcontractors and of persons directly or indirectly employed by its subcontractors, as it is for the acts and omissions of persons directly or indirectly employed by the Contractor. The Contractor shall require each Subcontractor to be bound by all obligations of this Contract by appropriate written agreement. Each subcontract agreement shall preserve and protect the rights of the Agency. Should any Subcontractor fail to perform the work undertaken by the Subcontractor to the satisfaction of the Agency, said Subcontractor shall be removed immediately from the Work upon request by the Engineer and shall not again be employed on the Work. The Contractor shall be held liable for all deficient Subcontractor work. Nothing contained in these Contract Documents shall create any contractual relationship between any Subcontractor and the Agency.
Add the following paragraphs to this subsection:
The Agency will not conduct business with an individual, firm or organization, and the Contractor shall not employ or otherwise use any Subcontractor, supplier, or equipment vendor at any tier that is on the U.S. General Services Administration’s “List of Parties Excluded from Federal Procurement and Non-Procurement Programs.”
A list of individuals, firms and organizations debarred, suspended or who have voluntarily excluded themselves from Federal Procurement and Non-Procurement Programs is maintained by the U.S.
General Services Administration. A copy of the “Excluded Parties List System” is available for Contractor’s use at the U.S. General Services Administration’s Internet URL website link at:
https://sam.gov/content/exclusions
or can be obtained from the Superintendent of Documents, U.S. Government Printing Office, Washington, D.C. 20402; 202-783-3238.
3-5 INSPECTION.
Delete the second sentence in its entirety. Add the following paragraphs to the end of this subsection:
All work which is defective and has been rejected shall be remedied, or removed and replaced and made good by the Contractor in an acceptable manner. Unsuitable materials may be rejected notwithstanding the fact that such unsuitable materials have been previously overlooked by the engineer and accepted. No additional compensation will be allowed to the Contractor for the removal and replacement of remedial or defective work, or unsuitable materials.
Any work done beyond the lines and grades shown on the Plans or established by the Engineer, or any Extra Work done without written notice by the Engineer, will be considered as unauthorized work 08/11/2026 C11 189 of 436
78 and will not be paid for. Upon order of the Engineer unauthorized work shall be remedied, removed or replaced at the Contractor’s expense.
Upon failure of the Contractor to comply promptly with any order of the Engineer made under Subsection 3-5 (“INSPECTION.”), the Agency may cause rejected or unauthorized work to be remedied, removed or replaced, and to deduct the costs from any monies due or to become due to the Contractor.
The Contractor shall notify the Agency at least twenty-four (24) hours in advance of the time required for the inspection of any Work which will be covered or which will require special inspection procedures.
INSPECTION TYPE PHONE NUMBER
City of Vista Building Inspection 760-639-6106
City of Vista Engineering Inspection 760-639-6113
City of Vista Landscape and Irrigation Inspection 760-643-5467
The Agency will pay for costs of inspection and materials testing, sufficient to verify the quality of the Contractor’s work. Any retesting of failing areas, or costs due to the Contractor’s failure to be ready for inspections requested by the Contractor, shall be paid for by the Contractor.
If the Contractor elects to work under this Contract more than eight (8) hours a day or more than forty (40) hours in a week, Saturday, Sunday or Agency holidays, unless otherwise specified, he shall arrange with the Engineer for the required inspection service and pay the Overtime Inspection Fees which will be charged at the following rates:
NUMBER OF OVERTIME HOURS COST
4 hours or less per day $375.00
4 to 8 hours per day $750.00
When Overtime Inspection is required, the Contractor shall notify the Agency and pay inspection fees twenty-four (24) hours in advance. If the Contractor is directed by the Agency to work under this Contract more than eight (8) hours a day or more than forty (40) hours a week, the Special Inspection fee requirements will be waived.
The Contractor shall notify the Engineer of the completion of the Work and the Engineer will make an inspection of the Work. The Engineer will not make the final inspection until the Work provided for and contemplated by the Contractor has been completed and the final clean up performed. The Contractor may be present at the final inspection. The Contractor will be notified in writing of any defects or deficiencies to be remedied. When notified that corrective work is completed, the Engineer will again inspect the Work and when the Engineer is satisfied that all work has been done in accordance with the Plans and Specifications, the Engineer will recommend that the Work be formally accepted.
3-5.1 Inspection by Other Jurisdictions.
Add the following new subsection:
08/11/2026 C11 190 of 436
79 3-5.1 Inspection by Other Jurisdictions. Whenever any part of the Work to be performed is under the jurisdiction or control of, or is to be paid for, in whole or in part, by another public agency, entity, or jurisdiction, including but not limited to another city, Vista Irrigation District, North County Transit District, the County of San Diego, the State of California, or the United States Government, such Work, in addition to Agency inspection, shall be subject to inspection and approval by the proper officials of such entities or jurisdictions.
3-6 THE CONTRACTOR’S REPRESENTATIVE.
Replace the first two sentences in this subsection with the following:
Before starting the Work, the Contractor shall provide in writing to the Agency a list of the representatives with local area codes and telephone numbers of at least two (2) persons in charge of or responsible for the Work, who can be reached for emergency work twenty-four (24) hours a day, seven (7) days a week.
Replace the third and fourth sentences in this subsection with the following:
Contractor shall have on the site, at all times, a Superintendent who will be in charge of all aspects of the Contractor’s work. The Superintendent shall be the individual authorized to receive directions from the Engineer of the Project and who will at all times act as the Contractor’s representative. Any order or communication given to the Superintendent shall be deemed delivered to the Contractor.
Contractor shall only replace the Superintendent upon written approval of the Agency. The Agency shall have the right to request that the Contractor appoint a new Superintendent if the Engineer or the Agency determines that such a replacement would be in the best interest of the Project.
Add the following paragraphs to this subsection:
The Contractor shall submit a daily report to the Engineer from the Contractor and all subcontractors, on forms approved by the Engineer. The report shall include a listing of all labor, materials and equipment involved for that working day. Failure to submit the daily report by the close of the next working day shall be just cause for the Agency to dispute progress pay requests. The Contractor shall coordinate daily with the Engineer to reconcile the report, and it shall be signed by both the Engineer and the Contractor. In the event of disagreement, pertinent notes shall be entered by each party to explain points which cannot be resolved immediately. Each party shall retain a signed copy of the report. Reports by subcontractors or others shall be submitted through the Contractor.
The report shall:
1] Show names of workers, classifications, and hours worked. 2] Show type of equipment, size, identification number, and hours of operation. 3] Describe the work done that working day, and what work was completed. 4] Describe status of any unresolved issues in such detail as the Agency may require.
3-7 CONTRACT DOCUMENTS.
3-7.1 General.
08/11/2026 C11 191 of 436
80 Add the following to the second paragraph in this subsection:
As shown on the Plans or described in the Specifications, each element of the Work must be furnished complete, finished and functional. Figured dimensions on drawings shall govern, but work not dimensioned shall be as directed. Work not particularly shown or specified shall be the same as similar parts that are shown or specified. Specifications shall govern as to materials, workmanship and installation procedures. The specification calling for the higher material or workmanship shall prevail.
In the event of any doubt or question arising respecting the true meaning of the specifications, reference shall be made to the representative of the owner of the facility affected by the work, whose decision shall be final.
Replace the last paragraph in this subsection with the following:
If the Contractor, either commencing work or in the course of the work, finds any discrepancy between the Specifications and the Plans, or between either and the physical conditions at the site of the Work, or finds any error or omission in any of the Plans, or in any survey, the Contractor shall promptly notify the Engineer in writing of any discrepancy, error, or omission. No work shall be done in any area of such discrepancy until the Engineer has given approval for same in writing. The Contractor shall forward written Requests for Information (RFIs) to the Engineer in all such matters.
Only written authorization from the Agency shall be binding over any deviation or changes in the Plans and Project Specifications. If the Contractor observes that any Plans or Specifications are at variance with any applicable law, ordinance, regulation, order or decree, the Contactor shall promptly notify the Engineer in writing of such conflict.
The Engineer on receipt of any such written notice will promptly investigate the circumstances and give appropriate instruction to the Contractor in writing. Until such instructions are given, any work done by the Contractor, either directly or indirectly, after the Contractor’s discovery of such error, discrepancy or conflict, shall be at the Contractor’s own risk, and the Contractor shall bear all costs arising therefrom.
3-7.2 Precedence of the Contract Documents.
Add the following paragraphs to this subsection:
With reference to the Drawings, the order of precedence, from highest to lowest, shall be as follows:
a) Figures govern over scale dimensions. In the event of any discrepancy between any drawings and the figures thereon, the figures shall be taken as correct. b) Detail drawings govern over general drawings
c) Large scale details shall take precedence over smaller scale drawings as to shape and details of construction.
d) Work not particularly shown or specified shall be the same as similar work that is shown or specified.
e) Addenda or Change Order drawings govern over Contract Drawings f) Contract Drawings govern over Standard Drawings
g) Contract Drawings govern over Shop Drawings
08/11/2026 C11 192 of 436
81 The specifications contained in the Agency’s Supplementary Special Provisions (General and Technical) take precedence over the specifications contained in the San Diego Regional Supplement to the Greenbook and the Greenbook. The specifications contained in the San Diego Regional Supplement to the Greenbook take precedence over the specifications contained in the Greenbook.
Should it appear that the Work to be done, or any of the matters relative thereto, are not sufficiently detailed or explained on the Contract Documents, or in the event of any doubt or question arising respecting the true meaning of the Specifications, the Contractor shall forward written Requests for Information (RFIs) to the Engineer for such further explanation as may be necessary and the Engineer’s decision shall be final and binding.
3-8 SUBMITTALS.
3-8.1 General.
Add the following to the end of the first paragraph in this subsection:
Promptly after the Notice to Proceed has been received by the Contractor, the Contractor shall provide to the Engineer a complete list of names and addresses of all suppliers of materials to be used on the Work.
Modify the second paragraph in this subsection as follows:
The Contractor shall allow a minimum of ten (10) Working Days for review of shop drawings and submittals. Each set of shop drawings or submittals shall be accompanied by a letter of transmittal and the Contractor’s certification (see description of certification below).
Add the following paragraphs to this subsection:
All submittals shall be submitted prior to the start of the Work unless otherwise approved by the Engineer. No work shall begin until the construction schedule has been approved by the Engineer.
The Contractor shall submit for Agency review and approval shop drawings and submittals for all long lead supplies, materials, and equipment within five (5) Working Days after the Notice to Proceed letter has been issued. The Contractor shall furnish the Engineer with a statement from the vendor(s) that the order(s) for said supplies, materials, and equipment has been received and accepted by said vendor(s) within fifteen (15) Working Days of said Notice to Proceed.
No work shall begin on the respective items of work that require a submittal until the submittals for those items of work have been approved in writing by the Engineer. When submitted for the Engineer’s review, shop drawings shall include the Contractor’s certification that the Contractor has reviewed, checked, and approved the shop drawings as conforming to the requirements of the Contract Documents. The following Contractor’s certification shall appear on all submittals:
“It is hereby certified that the (equipment, material) shown and marked in this submittal is that proposed to be incorporated into this Project, is in compliance with the Contract Documents, can be installed in the allocated spaces, and is submitted for review.
08/11/2026 C11 193 of 436
82 Certified by: ________________________________________ Printed name: ________________________________________
Title: ________________________________________
Date: ________________________________________
A copy of each shop drawing and each sample as reviewed by the Engineer shall be kept in good order by the Contractor at the site and shall be available to the engineer. A review fee of two hundred dollars ($200.00) will be withheld from the Contractor’s progress payment for every re-submittal after the third time a submittal has been reviewed and rejected.
Submittals shall be mailed, emailed or delivered to the City of Vista Engineering Department listed below. Submittals by facsimile (FAX) are not acceptable.
City of Vista
Engineering Department
200 Civic Center Drive
Vista, CA 92084-6275
Email: [email protected]
3-8.2 Working Drawings.
Add the following to Table 3-8.2:
TABLE 3-8.2 Note
Item Subsection Number Title Subject
15 306-7 Pipe laying Pipeline shop drawings
16 306-5 Dewatering Dewatering Plan
Notes: 1. The diagrams shall be of a size and scale to show clearly all necessary details. Pipeline layouts, for reference only, may be submitted in tabulated form in increasing order of alignment stationing.
2. Pipeline layout diagrams or schedules required for approval shall be submitted in accordance with 3-8.3. Layout diagrams or schedules are required for pipelines using pipe materials conforming to the indicated subsections.
The diagrams or schedules will be submitted for reference only, but curve layouts are required for approval.
Modify the fourth paragraph in this subsection to read as follows:
Working Drawings listed above as Items 4-7, 9-15 and 16 shall be prepared by a Civil or Structural Engineer registered by the State of California.
3-8.3 Shop Drawings.
Add the following to this subsection:
The following procedures will apply to shop drawing submittals:
08/11/2026 C11 194 of 436
83 a) The Contractor shall submit to the Engineer for review five (5) copies of all shop drawings.
These drawings shall be complete, certified by the Contractor, and shall contain all required information in detail. The Contractor shall make any corrections to shop drawings required by the Engineer.
b) It is considered reasonable that the Contractor shall make a complete and acceptable submittal to the Engineer by the third submission of a submittal item. (1) If a submittal is returned to the Contractor marked “No exceptions taken,” formal revision and resubmission of said submittal will not be required. (2) If a submittal is returned to the Contractor marked “Make corrections noted,” formal revision and resubmission of said submittal will not be required. (3) If a submittal is returned to the Contractor marked “Amend-Resubmit,” the Contractor shall revise said submittal and shall resubmit the required number of copies of the revised submittal to the Engineer.
(4) If a submittal is returned to the Contractor marked “Rejected-Resubmit,” the Contractor shall revise said submittal and shall resubmit the required number of copies of said revised submittal to the Engineer.
c) When reviewed by the Engineer, each copy of the drawings will be stamped and signed by the Engineer.
d) Two sets of said drawings will be returned to the Contractor. e) The review of the drawings shall not be construed as a complete check, but will indicate only that the general method of construction and detailing is satisfactory. The Contractor shall assume all responsibility for accuracy of data, details, and dimensions shown in the submittals. f) The Contractor agrees that if deviations, discrepancies, or conflicts between shop drawing submittals and the Contract Documents in the form of Plans and Specifications, except as particularly noted within the submittal, are discovered either prior to or after shop drawings submittals are processed by the Engineer, the Plans and Specifications shall control and shall be followed.
g) Revisions indicated on shop drawings shall be considered as changes necessary to meet the requirements of the Contract Plans and Specifications and shall not be taken as the basis of claims for Extra Work. The Contractor shall have no claims for damages or extension of time due to any delay resulting from making required revisions to shop drawings. The review of said drawings by the Engineering will apply to general design only and will in no way relieve the Contractor of responsibility for errors or omissions contained therein nor will such review operate to waive or modify any provisions or requirements contained in these Contract Specifications or on the Contract Drawings.
h) The Contractor shall furnish to the Engineer eight (8) copies of instruction and maintenance manuals and parts lists of all major equipment furnished. Data in these manuals shall cover completely all items as specified and as supplied.
i) Shop fabrication drawings and lay sheets are required for all steel pipelines sixteen inches and greater in diameter (16”+ Ø). The drawings and lay sheets shall fully illustrate horizontal station and vertical elevation of all joints and angle points, true angular deflection at locations of combined vertical and horizontal bends, and horizontal station for pipeline appurtenances.
3-8.4 Supporting Information.
Add the following items to this subsection:
08/11/2026 C11 195 of 436
84 n) City of Vista Stormwater Management Permit and Storm Water Pollution Prevention Plan (SWPPP), if required, per Subsection 2-2 (“PERMITS.”).
o) Waste Management Plan Permit Application per Subsection 3-12 (“WORK SITE MAINTENANCE.”).
p) Noise Control Notification per Subsection 3-12.3 (“Noise Control.”). q) Traffic Control Plans per Subsection 601-2 (“Traffic Control Plan (TCP).”). r) Night Work Plan per Subsection 5-7.1.3 (“Safety for Night Work.”).
Add the following paragraphs to this subsection:
Compliance certificates and weigh slips shall be provided for all fill material, aggregate base, asphalt concrete, Portland Cement Concrete, reinforcing steel, etc. The Contractor shall submit mix designs for asphalt concrete and Portland Cement Concrete to the Engineer for approval. All asphalt concrete and Portland Cement Concrete weigh slips (delivery tickets) shall include the mix design and number or the actual weights of aggregate, sand, cement and water in each truckload. In addition, the Contractor must schedule a meeting and meet with the Engineer each working day to confirm the quantities of materials shown on the weigh slips. The Engineer shall approve any admixtures prior to use. The Contractor shall submit to the Engineer a certified mill test report for each heat or size of reinforcing steel.
The Contractor shall submit the names and addresses of all suppliers of mineral construction materials, and the mine from which the materials were obtained, along with a copy of the Office of Mine Reclamation AB 3098 List (per California Assembly Bill 3098) showing that the mining operation is listed, prior to delivering any mineral construction materials to the Project site. This documentation regarding the Office of Mine Reclamation AB 3098 List (per California Assembly Bill 3098) shall be made a part of every submittal required on the Project that includes mineral construction materials.
Failure to identify the supplier and the mine may result in rejection of the submittal.
3-8.7 Record Drawings (“As-Builts”).
Add the following new subsection:
3-8.7 Record Drawings (“As-Builts”). It shall be the Contractor's responsibility to keep and maintain, on the job site, a clean, accurate, full-size and legible print set of Project plans that indicate all changes in work, modifications and existing conditions that are different from what is shown on the Plans. The Contractor shall record the location, by stationing to nearest foot, and the depth, by elevation to the nearest tenth of a foot (+/- 0.1’), of all underground utility facilities, including pipes, valves, plugged tees, capped ends, etc. The Contractor shall record, by dimension and / or scale drawings, all wiring, conduits and pull boxes as actually installed. All information necessary to maintain and / or service any concealed work shall be noted on the record drawings. The locations by station of sewer laterals and water services (both perpendicular and skewed) to their mains must be noted on the record drawings. Records shall be kept up to date with all entries checked by the Engineer before the Work is buried or covered up. The Contractor shall make the Record Drawings available for review by the Engineer at any time.
08/11/2026 C11 196 of 436
85 Upon completion of the Work and prior to final acceptance, the complete set of Plans, marked up to show as-built conditions, shall be delivered to the Engineer for review. Full compensation for preparing, maintaining and providing Record Drawings (“As-Builts”) shall be included in the stipulated lump sum price for this item of work. If no item is shown in the bid, then the Contractor shall include all costs in the various items of work.
3-9 SUBSURFACE DATA.
Add the following paragraph to this subsection:
The Contractor shall investigate the existing geotechnical (soil) conditions prior to submitting a bid, and shall satisfy himself as to the existing geotechnical (soil) conditions, and include all costs to address those conditions in the bid. Upon removal of the existing surface improvements and excavation to subgrade by the Contractor, the Agency will sample existing soils for analysis of the R- value, moisture content, and compaction. Upon determination of the existing geotechnical (soil) conditions and a final street structural section, the Agency will advise the Contractor regarding addition of geogrid or adjustments to the thickness of the aggregate base and the asphalt concrete layers.
Final payment for the approved street structural section will be made pursuant to the unit prices listed in the bid, based on actual quantities of the materials placed, and no additional compensation will be allowed.
3-10 SURVEYING.
3-10.1 General.
Replace all three paragraphs in this subsection with the following:
3-10.1 General. The Contractor shall notify the Engineer and the Professional Land Surveyor or Registered Civil Engineer authorized to practice land surveying in the State of California (“Surveyor”) performing construction staking at least five (5) Working Days before starting work to allow for the preservation of reference points, survey monuments, lot stakes (tagged), benchmarks and other survey points.
In accordance with the Professional Land Surveyors Act (State of California Business and Professions Code 8771(a), (b) and 8773.2 (as amended by California Senate Bill 1563), the Surveyor performing construction staking for the Project shall file in the Office of the County Surveyor a Corner Record form or Record of Survey prior to the completion of construction for the replacement of survey monuments. The Contractor shall not disturb survey monuments, lot stakes (tagged), or benchmarks without the consent of the Engineer, and in the case of willful or careless destruction, shall be liable for and charged with the cost of their replacement and of any expenses resulting from their unnecessary loss. Replacement shall be done only under the direction of the Engineer by a Register Land Surveyor or a Register Civil engineer authorized to practice land surveying within the State of California.
Upon submittal of all Corner Record forms or Records of Survey to the San Diego County Surveyor’s office, the Surveyor performing construction staking for the Project shall submit copies of the same records to the Agency. Upon acceptance and approval by the San Diego County Surveyor’s office, the 08/11/2026 C11 197 of 436
86 Surveyor shall also submit Corner Record forms or Records of Survey (Mylar) copies of the same records to the Agency prior to completion of the Project.
The Contractor shall notify the Engineer and the Surveyor performing construction staking in writing by submitting a completed “City of Vista Engineering Construction Survey Request Instructions and Form” found in Appendices (see list of Appendices in Table of Contents on Page 2) at least ten (10) Working Days before survey services will be required in connection with the laying out of any portion of the Work. The Surveyor performing construction staking for the Project shall set and station stakes for clearing limits, rough grade, sewers, storm drains, water, dry utilities, structures, finish (precise) grade, curbs, headers, base grade, pavement and other improvements. The Surveyor shall submit acceptable preconstruction survey tie notes to the Engineer for approval. A corresponding cut or fill to finish grade (or flowline) will be indicated on the Surveyor’s grade (cut) sheet. The Contractor shall be required to excavate all holes necessary for offset line and grade stakes if in excess of one-half foot (0.5’) deep.
All survey monuments, centerline ties and survey reference points shall be protected in place or reestablished where disturbed, in accordance with Section 8771 of the Professional Land Surveyor’s Act (Business & Professions Code Section 8700 et seq.), prior to Project acceptance.
3-10.2 Line and Grade.
Replace the first and second paragraphs in this subsection with the following:
All work, including finished surfaces, shall during its progress and upon completion conform to the lines, grades, cross-sections, elevations and dimensions shown on the Plans. All distances and measurements are given thereon and will be made in a horizontal plane. Three (3) consecutive points shown on the same rate of slope must be used in common in order to detect any variation from a straight line. In the event any discrepancy exists, it must be reported to the Engineer. Failure to make this report shall make the Contractor responsible for any error in the finished work. Minor deviations from approved Plans, whenever required by the exigencies of construction, shall be determined in all cases by the Engineer and authorized in writing.
Add the following paragraphs and table to this subsection:
The Professional Land Surveyor or Registered Civil Engineer authorized to practice land surveying in the State of California (“Surveyor”) performing construction staking will furnish construction stakes to prosecute the Work as part of the various items of work. Surveying and staking shall be performed using survey equipment and methods appropriate for the Work. For grades equal to or less than one- half percent (0.5%), elevations for staking shall be established by differential leveling. The Surveyor performing construction staking for the Project shall provide the following stakes as needed to complete the Work:
STAKE TYPE STAKE REQUIREMENTS
Clearing and Grubbing Show limits of Work at fifty foot (50’) maximum intervals and at angle points
08/11/2026 C11 198 of 436
87 STAKE TYPE STAKE REQUIREMENTS
Slope Show rough grading for slopes at fifty foot (50’) maximum intervals as needed for construction
Rough Grade Show rough grading for road subgrade on centerline at fifty foot (50’) maximum intervals and on slopes as needed to achieve cut or fill to finished grade as indicated on a grade sheet Drainage Structure Two (2) front corners with line stakes with ten foot (10’) maximum offset, invert elevations in and out, and information for top of structure elevation
Pipelines (storm drain,
sewer, water, etc.)
At twenty-five foot (25’) maximum intervals for invert elevation or top of pipe; also at change of alignment or grade
Sewer and Storm
Drain Manholes
Centerline, invert elevations in and out, and top of rim Road Base Establish finish base grade at centerline of street and intersections, provide “blue tops” at fifty foot (50’) maximum on centerline of street and at ten to fifteen foot (10’ - 15’) grid within intersections
Finish Asphalt Grade At twenty-five foot (25’) maximum intervals for irregular asphalt cuts and fills to set leveling surfaces and at ten to fifteen foot (10’ - 15’) grid within intersections with additional stakes for landings at the bottom of curb ramps
Curb and Gutter At twenty-five foot (25’) maximum intervals and at the top of driveway entrance wings
Curb Return At each quarter (1/4) delta with a stake at the curb return radius point
Curb Ramp Top and bottom of curb transitions, lip of depressed gutter, finished surface at four (4) corners of top landing, & transitions Driveway Centerline and wings (join lines if matching to existing) Street Light and Traffic
Signal poles
Five to seven foot (5’ - 7’) maximum offset showing centerline of poles
The Surveyor performing construction control surveying / staking shall provide one (1) copy of all grade sheets to the Engineer.
The cost to reset construction survey stakes lost or destroyed during construction operations shall be borne by the Contractor.
3-10.3 Payment.
Add the following new subsection:
3-10.3 Payment. The Professional Land Surveyor or Registered Civil Engineer authorized to practice land surveying in the State of California (Land Surveyor) performing construction control surveying / staking will furnish construction stakes to prosecute the Work, and no compensation will be made to the Contractor for delays to the Work caused by the Contractor’s lack of coordination with the Agency to schedule Construction Staking. Payment for all Work necessary for preserving, 08/11/2026 C11 199 of 436
88 documenting, and re-establishing existing survey monuments, as specified, will be as shown in the bid, and no additional compensation will be allowed. The cost to reset stakes lost or destroyed during construction operations shall be borne by the Contractor. Payment for providing construction staking on the Project will be made by the Agency directly to the Land Surveyor under contract with the Agency.
3-11 CONTRACT INFORMATION SIGNS.
3-11.1 City of Vista Project Information Signs.
Add the following new subsection:
3-11.1 City of Vista Project Information Signs. Before the start of any work, the Contractor shall design, supply, install, and maintain (2) aluminum 4’ x 4’ signs to inform the public about the Project.
The signs shall be designed and made by a professional sign company. Sample artwork for each sign is included in the appendices (see list of Appendices in Table of Contents on Page 2). The Contractor shall submit the sign layout to the Engineer for approval before signs are fabricated.
Information on the sign shall include: City name with seal, Project name and CIP number, limits of Project, month and year when Project shall begin and end, funding source(s), and names of the City Council.
Project Information Signs shall be posted with 4” x 4” wood posts within the parkway adjacent to the street at a location approved by the Engineer and at least seven feet (7’) above the pedestrian travel way. Signs and sign posts shall be located within the public right-of-way and may not hinder or obstruct driver’s line of sight. The text on the sign shall be large and legible from a distance. All signs provided by the Contractor shall be protected by an anti-graffiti coating similar to 3M/1160.. Signs shall be posted at least three (3) Working Days prior to start of construction and remain posted until the final job walk is completed. The signs shall then be removed and property disposed. Contractor shall be responsible for the maintenance of these signs until removed.
For the NORTH INDIANA AVENUE SIDEWALK IMPROVEMENTS, the (2) signs on East Indian Rock Road shall be placed at the each limit of the Project, and shall not be in conflict with vehicular or pedestrian traffic or be the cause of any safety concerns.
Full compensation for the Project Information Signs, including design, construction, anti-graffiti coating, deployment, maintenance, and salvage removal / delivery at project completion to the Agency’s Public Works Yard at 1165 E. Taylor Street, and furnishing of all necessary labor, equipment, materials, and all other related costs shall be considered as included in the Bid price for “Project Information Sign.” Payment for the Project Information Signs shall be paid under the unit price bid for each sign as shown on the BID SCHEDULE at ninety percent (90%) for the completed installation of the signs, ten percent (10%) for the removal and delivery of the signs upon completion of the Work and no additional compensation shall be allowed therefore.
3-11.2 Public Notification.
Add the following new subsection:
08/11/2026 C11 200 of 436
89 3-11.2 Public Notification. The Contractor shall prepare typewritten Public Notification fliers in English and Spanish per the BID SCHEDULE. Fliers shall notify residents and businesses of the Work and include information describing the Work, how it may affect them and contact information of Agency and Contractor personnel responsible for the work. The Engineer will provide the contact information for the Agency to be included on the flier at the Pre-Construction Meeting. The Contractor shall submit draft versions of the flier in English and Spanish to the Engineer for review and approval prior to starting the Work. The Contractor shall to provide advance notifications of the Work to residents and businesses adjacent to or affected by the Work by hand delivering “door knob type” fliers distributed at least five (5) Working Days prior to Work.
These notices shall also be distributed at other times during the Work as required to notify affected people in the area of impending work, including, but not limited to, prior to commencing rehabilitation, resurfacing, or reconstruction work on streets that will affect access to traffic or pedestrians.
Based upon the work schedule, the Contractor shall notify residents and businesses of the work and post temporary “No Parking” signs to all residences and businesses located in the work limits and along any detour routes.
The Contractor shall provide additional notification for night work that creates excessive noise, as described in Subsection 3-12.3 (“Noise Control.”) of these Specifications.
Full compensation for the Public Notification shall include all necessary labor, equipment, materials, and all other related costs for preparation, copying, and distribution shall be considered as included in the lump sum price Bid for Public Notification.
3-12 WORK SITE MAINTENANCE.
3-12.1 General.
Replace the second paragraph in this subsection with the following:
The Contractor and all Subcontractors are required to clean up the site on a daily basis. This cleanup shall include, but not be limited to, the Contractor furnishing and operating a self-loading motorized street sweeper equipped with a functional water spray system or by hand (depending on the size of the daily job/cleanup), removal of all construction material that is no longer needed on the job site, daily removal of all construction rubbish/trash away from the job site, proper storage of all construction equipment including traffic control devices that are not in use. The sweeper shall clean all paved areas within the Work site and all paved routes at least once each working day for the purpose of keeping paved areas acceptably clean whenever construction, including restoration, is incomplete. It shall be the Contractor’s responsibility to keep vehicle and pedestrian travel ways broom clean at all times. Failure to comply with these daily cleanup requirements may result in the Agency performing the cleanup work and deducting the cost from the Contractor’s payment(s).
The sweeper shall be certified to conform to the South Coast Air Quality Management District’s (SCAQMD) (California) Rule 1186 requirements, which limit the amount of very fine particles of dust that can become airborne during sweeping operations. For additional information regarding SCAQMD’s Rule 1186, go to Internet URL website link at:
08/11/2026 C11 201 of 436
90 http://www.aqmd.gov/home/rules-compliance/rules/fleet-rules/sweepers
Upon completion and before making application for acceptance of the Work, the contractor shall clean the construction site and all ground occupied by him in connection with the Work of all rubbish, excess materials, temporary structures, and equipment. All parts of the Work area shall be left in a near and presentable condition.
Care should be taken to prevent spillage on streets over which hauling is done, and any such spillage or debris deposited on streets due to the Contractor's operation shall be immediately cleaned up.
The Contractor shall remove and dispose of all structures, debris, or other obstructions to the construction of the Work as specified. Where such obstructions consist of improvements not required by law to be removed by the owner thereof, all such improvements shall be removed, maintained, and permanently replaced by the Contractor at his expense as required for performance of the Work.
The Contractor shall furnish all water necessary for compaction, cleaning, flushing, dust control, etc.
No separate payment will be made for any work performed or material used to control dust resulting from the Contractor’s performance of the Work, or by public traffic, either inside or outside the right-of-way.
Full compensation for conforming to the requirements of this Subsection 3-12.1 shall be considered as included in the various items of work involved and no additional compensation shall be allowed therefor.
Add the following paragraphs to this subsection:
EDCO Waste and Recycling Company has an exclusive franchise agreement with the Agency for waste hauling. If the Contractor requires waste disposal service, that service must be provided by EDCO. The Contractor is to make his own arrangements with EDCO and pay for all waste disposal, which is to be included in his overall Contract bid.
As a result of AB 939, the Agency has established a Construction and Demolition (C&D) Recycling Ordinance (Vista Municipal Code Chapter 13.17) to help divert waste from landfills and to comply with mandates of the California Integrated Waste Management Board (per City of Vista Ordinance No. 2006-19). Many of the materials generated from construction and demolition projects can be recycled or reused. The Agency requires any contractor that generates debris to use a recycling service (EDCO or other Agency-approved recycling company) and fill out a Waste Management Plan (WMP). The Contractor shall cooperate with the Agency’s Inspector and Agency’s Waste Management Compliance Officer in completing the WMP prior to obtaining the required “No Fee” Construction Permit. If you have any questions about the Agency’s Construction and Demolition Recycling Ordinance or how to get a copy of this form, please contact the City of Vista at (760) 639-6108.
The Contractor shall provide copies of all receipts from EDCO and include all demolition costs in his construction bid.
08/11/2026 C11 202 of 436
91 Full compensation for furnishing all labor, materials, equipment and incidentals for clean-up and dust control as specified, including weekends and other non-working days at the Agency’s request, shall be considered as included in related items of work and no additional compensation will be allowed therefore.
3-12.2 Air Pollution Control.
Add the following paragraph to this subsection:
All cold milling equipment, sandblast pots over one-hundred pounds (100 lbs.), portable engines over fifty horsepower (50 HP), and auxiliary engines on construction equipment which are not used to drive equipment require permits from the San Diego County Air Pollution Control District (SDAPCD).
The Contractor must obtain and maintain all required permits, and follow all permit requirements.
3-12.3 Noise Control.
Add the following paragraphs to this subsection:
The Contractor shall comply with local ordinances regulating noise level (see Vista Municipal Code Chapter 8.32).
All construction activities (including, but not limited to, the use of tools, machinery or equipment used in connection with construction operations), regardless of hours of operation, shall be kept below an average hourly sound level of seventy-five (75) dBA Leq measured at fifty feet (50’) from the noise source. A noise level limit of ninety-five (95) dB at a distance of fifty feet (50’) shall apply to all construction equipment on or related to the job whether owned by the Contractor or not. Examples include but are not limited to: equipment startups, equipment staging in or near the project, truck deliveries to the project, construction traffic loud talking, etc.
This ordinance applies to all grading operations and all public improvement construction on private or public property.
The Contractor shall not perform high-noise producing work (e.g. jack-hammering, saw-cutting, sand blasting, cold milling, compacting, etc.) between the hours of 10:00PM and 7:00AM, unless the Contractor is directed to perform work at night as part of a unique project, to avoid excessive impacts to traffic, businesses, or schools. The Contractor shall provide written notification to all residential properties within five hundred feet (500’) of the work zone at least seventy-two (72) hours in advance of performing: 1) work during these hours; 2) high-noise producing during working hours. The proposed notification form and list of properties shall be submitted to the Engineer for approval.
Stationary construction equipment shall be placed such that emitted noises are directed away from sensitive noise receivers such as residential uses. The Contractor shall make every effort to create the greatest distance between noise sources and receptors during construction operations.
The Contractor shall use only such equipment on the Work and in such state or repair, that the emission of sound therefrom is within the noise tolerance level of that equipment, as established by 08/11/2026 C11 203 of 436
92 accepted standards of the industry. Should the Agency determine that the muffling device on any equipment used on the Work is ineffective or defective so that the noise tolerance of such equipment, as established by accepted standards of the industry, is exceeded, such equipment shall not, after such determination by the Agency, be used on the Work until its muffling device is repaired or replaced so as to bring the noise tolerance level of such equipment within such standards.
3-12.4 Storage of Equipment and Materials.
3-12.4.1 General.
Add the following paragraphs to this subsection:
For the NORTH INDIANA AVENUE SIDEWALK IMPROVEMENTS, the Contractor may use, at his own risk, the City’s vacant lot located at 1125 E. Taylor Street (APN 171-250-30) as a staging area and for parking construction equipment when not in use. The Contractor may also use, at his own risk, a vacant lot on the north side of West Vista Way next to Coast Equipment Rental, a paved parking lot on the south side of West Vista Way at the Emerald Drive intersection, a vacant lot on the north side of Hacienda Drive west of Pomelo Drive, excess road right of way where Hacienda Drive splits west of La Tortuga Drive, a small areas along Business Park Drive between Park Center Drive and Scott Street, excess road right of way along Crescent Drive west of Avalon Drive, the two sides of the driveway to the old Sycamore Mobile Home Park at 751 East Vista Way, or some excess road right of way at the intersection of Vale Terrace Drive and Williamston Drive. Exhibits showing these potential staging and storage areas are included in the appendices (see list of Appendices in Table of Contents on Page 2), and the sites are indicated on the Index Maps of the Plans. The Contractor shall place asphalt concrete cold milling spoils at any of the staging and storage sites used for this project, as directed by the Engineer and by Public Works, to stabilize the surface. The Contractor shall implement and maintain all appropriate storm water pollution prevention BMP’s to prevent discharges from the staging and storage areas. If the Contractor chooses to use any of the possible staging areas, any adjacent sewer easements and access roads must remain accessible to Vista Public Works and Sanitation crews at all times of the day or night. After using any area for staging or storing materials or equipment, the Contractor shall clean up the staging and storage areas used for the project, and return them to their pre-existing condition, to the satisfaction of the Engineer and the Public Works Supervisor.
The Contractor shall obtain and maintain, at his own cost, a construction staging area outside of the right of way or outside the boundaries of the Agency’s property, unless a staging area is specifically shown on the Plans or described in the specifications. Any posted signs for or related to the staging area must be of professional quality and approved by the Engineer prior to placement. The staging area must be established, maintained and removed in a manner acceptable to the Engineer and the owner of the land where the staging area is situated. The Contractor shall be solely responsible for the security and liability of the staging area. The staging area maybe fenced, lighted and locked. Guard dogs are not allowed at the construction staging area. Such staging areas shall meet all requirements of applicable standards, codes, ordinances and laws, and shall be established at least five (5) Working Days prior to commencement of work.
When any product, material or equipment is to be stored outside the highway or street right-of-way or Agency property, the Contractor shall first obtain written permission from the property owner on whose property the storage is to be made. The Contractor shall file with the Engineer an original permission letter, together with a written release from the property owner absolving the Agency or its 08/11/2026 C11 204 of 436
93 employees from any and all responsibility in connection with storage of materials, products or equipment on said property.
3-12.4.2 Storage in Public Streets.
Add the following paragraphs to this subsection:
Personal vehicles of the Contractor’s employees shall not be parked on any section closed to the public traffic.
No equipment or materials may be stored on public street rights-of-way unless pre-approved by the City of Vista Traffic Engineering Division.
3-12.4.3 Storage on Private Property.
Add the following new subsection:
3-12.4.3 Storage on Private Property. The Contractor and all Subcontractors shall minimize the effects of construction operations upon private properties adjacent to the Work.
Prior to storing equipment or material on private property, the Contractor shall provide copies of all letters of permission or written agreements executed by affected property owners for the purpose of granting trespass rights to enter upon, stockpile or store Contractor's supplies and equipment to the Engineer. The Contractor shall, as a penalty to the Agency, forfeit one hundred dollars ($100) per day as a fine for each parcel as determined by the Engineer for failure to provide copies of such documentation to the Engineer prior to storing equipment or material on private property. Said fine or fines will be deducted from the Contractor’s subsequent monthly progress payment. The Contractor is solely responsible to initiate contact and negotiate agreement with property owners if the Contractor should desire to use private property for storage or other purposes.
Materials or equipment placed on private property without owner's consent or in breach of owner/contractor Contract shall constitute ground for immediate issuance of a stop work notice to the Contractor. The Contractor shall then be required to suspend all operations until affected property is cleaned up and restored to original condition. Additional Contract days will not be granted due to stop work action against Contractor.
3-12.6 Water Pollution Control.
3-12.6.1 General.
Add the following to this subsection:
The Contractor shall adhere to, the requirements of the San Diego Regional Water Quality Control Board (RWQCB). All work shall be performed in accordance with ORDER NO. R9-2013-0001, AS AMENDED BY ORDER NOS. R9-2015-0001 AND R9-2015-0100 NPDES NO. CAS0109266 - NATIONAL 08/11/2026 C11 205 of 436
94 POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES) PERMIT AND WASTE DISCHARGE
REQUIREMENTS FOR DISCHARGES FROM THE MUNICIPAL SEPARATE STORM SEWER SYSTEMS (MS4s) DRAINING THE WATERSHEDS WITHIN THE SAN DIEGO REGION, which can be found on the Internet at:
http://www.waterboards.ca.gov/rwqcb9/water_issues/programs/stormwater/index.shtml
The Contractor shall adhere to, and shall perform in accordance with the requirements of Vista Municipal Code Chapter 13.18 – Storm Water Management and Discharge Control Program.
As part of the application for City of Vista Storm Water Management Permit, the Contractor shall submit an erosion control plan showing all pollution prevention, erosion and sediment control, and site management practices, to the City Engineer for review and approval, and shall implement and maintain all appropriate measures to prevent polluted discharges from entering storm water conveyance facilities (e.g. channels, storm drains, and water bodies). The Storm Water Management Permit application and erosion control plan must be prepared and submitted by the Contractor and approved by the City Engineer before any land disturbance activities can take place on the construction site.
3-12.6.1.1 Compliance.
Add the following new subsection:
3-12.6.1.1 Compliance. The Contractor shall make every effort to comply with the provisions of this subsection. However, should the Contractor violate any of the provisions of this subsection, or if pollution occurs in the work area for any reason, the Contractor shall immediately notify the City Engineer. If an unmitigated non-storm water discharge leaves the construction site, the Contractor shall immediately stop all the activity causing the discharge and mitigate the discharge and immediately notify the City Engineer or call the Storm Water Hotline at 760-643-2804. In addition the Contractor shall, with seven (7) calendar days, submit written confirmation to the City Engineer describing the incident and corrective actions taken. If pollution, for whatever reason, is detected by the City Engineer before notification by the Contractor, the required written confirmation shall also include any explanation of why the Contractor had not notified the City Engineer.
As soon as practical, any and all waste material, sediment, debris or other pollution from any discharge shall be removed from the work area and/or the drainage system by the Contractor. Any remedial actions will be the sole responsibility of the Contractor.
The Agency may make any further corrective actions, as deemed necessary, for abatement of water pollution if the Contractor has violated any of the provisions of this subsection. The Contractor shall be responsible for all costs incurred for the corrective actions. Failure to comply with the requirements of this subsection may result in the suspension of Work per Subsections 6-6 and 6-4.3 (“SUSPENSION OF THE WORK.” and “Payment for Delays.”). The City’s Municipal Code (Vista Municipal Code) Section 13.18 allows for administrative, misdemeanor penalties, infractions, and civil actions for non-compliance and enforcement actions that include stop work orders. Failure may also result in significant fines and possible imprisonment. A prosecuting authority may assess fines of up to 08/11/2026 C11 206 of 436
95 $37,500 per calendar day for each violation. The Contractor shall also reimburse the Agency for any fines assessed against and paid by the Agency and that are the result of the Contractor’s failure to comply with these specifications.
Compliance with the requirements of this subsection shall in no way relieve the Contractor from its responsibility to comply with other provisions of the Contract, in particular its responsibility for repair of damage and for preservation of property.
3-12.6.2 Best Management Practices (BMPs).
Add the following to this subsection:
Prior to commencement of any land disturbance activities, the Contractor shall educate all employees, subcontractors, and suppliers about storm water pollution prevention and mitigation measures needed during various construction activities to prevent the impacts originating from construction discharges. The Contractor shall ensure that all personnel are periodically trained in storm water and urban runoff management. A list of attendees and copies of the educational materials shall be kept on file at the site and submitted to the City Engineer at the conclusion of each training session, upon request.
The Contractor shall designate a qualified person who is trained and competent in the use of Best Management Practices (BMPs) and who shall be on the site daily to evaluate the conditions of the site with respect to storm water pollution prevention. This person shall ensure the implementation of the conditions of the City of Vista Storm Water Management Permit, erosion control plan, Contract Documents, and other State and local regulations and ordinances with respect to the control of erosion, sediment and other forms of water pollution, as well as other waste management regulations.
The Contractor shall implement pollution control measures and BMPs to prevent the impounding of runoff, nuisance water, sediment movement, and debris movement from the construction site onto adjacent properties or from adjacent properties onto the construction site. If the City Engineer determines that the Contractor’s measures are not adequate, the Contractor shall provide whatever additional measures are required to gain compliance.
The Contractor shall protect with BMPs, such as gravel bags and filter fabric, all new and existing storm water conveyance system structures and other facilities from sedimentation or other related construction debris and discharges, or by any other equal product that is acceptable to the City Engineer. The Contractor shall schedule and conduct land disturbance operations, such as demolition, clearing, and grading, to minimize or avoid rain fall induced erosion and sediment discharges and prevent tracking at the construction site during ingress and egress. Water pollution control activities shall also consist of implementing good housekeeping BMPs to reduce the discharge of pollutants from construction sites. Such features as drainage gutters, slope protection blankets, and retention basins, if applicable to the site as described in the erosion control plan, shall be constructed prior to start of work. The Contractor shall prevent any discharge of concrete rinse water or other pollutant into a storm water conveyance facility by using physical barriers.
The Contractor shall maximize the preservation of existing native and non-native vegetation and minimize soil disturbance within the limits of Work.
08/11/2026 C11 207 of 436
96 The Contractor shall show on the erosion control plan all water pollution, erosion control, and sediment control BMPs for the Work including the locations for concrete washout, vehicle maintenance, staging, dispensing of fuel, and storage areas. Further, the Contractor shall show all pollutant control measures or BMPs to be used to confine construction waste in designated areas, including construction entrance stabilization and wheel-wash measures to reduce the tracking or deposition of sediment onto public and private roads.
During the dry season (May 1 through September 30 each year), the Contractor shall inspect at least monthly all pollutant control measures or BMPs installed to mitigate construction activities during the dry season. During the rainy season (October 1 through April 30 each year), the Contractor shall inspect at least weekly all pollutant control measures, inspect before and after every rain event and every twenty-four (24) hours during any prolonged rain event.
The Contractor shall implement the following water pollution control measures:
(a) Minimum Water Quality Protection Requirements:
(1) Eroded sediments and other pollutants must be retained on site and may not be transported from the Work site via sheet flow, swales, area drains, natural drainage, tracking by vehicles or equipment, or wind. Erosion from slopes and channels shall be controlled by implementing an effective combination of BMPs, such as the limiting of grading scheduled during the rainy season; planting and maintenance of vegetation on slopes; and cover to prevent or minimize erosion of susceptible slopes. (2) Stockpiles of earth and other work-related materials must be protected from being transported from the site by wind or water.
(3) Fuels, oils, solvents, and other toxic and non-toxic substances shall be stored in accordance with the manufacturers’ instructions. All storage containers shall be protected from the weather. Fuels, oils, solvents, and other toxic substances originating from the Contractor’s operations shall not be allowed to contaminate the soil, storm water or surface waters or enter the ground water or be placed where they will enter a live stream, channel, drain, or other water conveyance facility.
(4) The Contractor may not wash excess or waste concrete onto the ground or into the public rights of way or any drainage system. Provisions shall be made to retain concrete wastes onsite with containment until it can be appropriately disposed of or recycled. (5) Trash and construction-related solid wastes must be deposited into a covered receptacle to prevent contamination of rainwater and dispersal by wind. (6) Vehicle and equipment traffic shall not track sediments and other materials from the construction site. The Contractor must stabilize the entrance roadways to the construction site to inhibit sediments from being deposited into the public rights of ways. Accidental depositions must be swept up immediately and may not be washed down by rain or by any other means. All loose soil and debris shall be removed from street areas upon starting operations and periodically thereafter as directed by the City Engineer. (7) Non-storm water, wash water and runoff from equipment and vehicle washing and any other activity shall be contained at the construction site. (8) The Contractor shall protect all new and existing storm drain system structures from sedimentation, or other construction related debris and discharges with gravel bags and filter fabric or by any other equal product or measure acceptable to the City Engineer. 08/11/2026 C11 208 of 436
97 Accumulated debris shall be cleaned up and properly disposed of by the Contractor to prevent the materials from entering or being carried into storm water conveyances. (9) When making sawcuts in pavement, use as little water as possible and perform during dry weather. Cover each storm drain inlet completely with filter fabric or plastic during the sawing operation and contain the slurry by placing straw bales, sandbags, or gravel dams around the inlets. After the liquid drains or evaporates, shovel or vacuum the slurry residue from the pavement or gutter and remove from site. Alternatively, a small onsite vacuum may be used to pick up the slurry as this will prohibit slurry from reaching storm drain inlets.
(10) Pavement marking:
• Schedule pavement marking activities for dry weather. • Develop paint handling procedures for proper use, storage, and disposal of paints. • Transfer and load paint and hot thermoplastic away from storm drain inlets. • Provide drop cloths and drip pans in paint mixing areas. • Properly maintain application equipment.
• Street sweep all grindings. Yellow thermoplastic grindings may require special handling as they may contain lead.
• Paints containing lead or tributyltin are considered a hazardous waste and must be disposed of properly.
• Use water based paints whenever possible. If using water based paints, clean the application equipment in a sink that is connected to the sanitary sewer. • Properly store leftover paints if they are to be kept for the next job, or dispose of properly.
(11) After the completion of the Work, the construction site shall be cleared of trash and debris and restored to a condition equal to or better than that existing before construction by completing all approved landscaping and permanent or post-construction sediment controls.
(b) Erosion Control Plan
Whenever it appears that the construction site will have grading during the rainy season, or as requested by the City Engineer, the Contractor shall be prepared to execute a rain event action plan based on implementation of BMPs as specified in the Project’s Erosion Control Plan.
The Contractor shall mark with a stencil, concrete stamp, or ceramic tile every storm drain inlet within the Project boundaries to indicate that no dumping is allowed in storm drainage facilities that discharge in the ocean. The stencil or tiles are available from the City Engineer, with five (5) Working Days advance notice. On curb inlets, the stencil shall be placed at the curb line on the inlet roof, the stamp should be placed on the inlet roof or in the sidewalk behind the inlet, and the tile shall be affixed to the gutter with pavement-marker adhesive or inset in the concrete in the center of the inlet opening.
On catch basins, the stencil, stamp, and tile shall be placed or imprinted next to the inlet grate. Extra concrete may be required next to the grate to accommodate the stencil, stamp, or tile dimensions.
3-12.6.5 Payment.
Replace the paragraphs in this subsection with the following:
08/11/2026 C11 209 of 436
98 All costs for the work required to comply with the requirements of this subsection shall be included in the bid item for Storm Water Pollution Prevention and Erosion Control as shown on the BID SCHEDULE. If no bid item is provided, the cost of the work required to comply with this subsection shall be considered as included in the prices bid for the various items of work.
3-13 COMPLETION, ACCEPTANCE, AND WARRANTY.
3-13.2 Acceptance.
Add the following paragraphs to this subsection:
Contractor shall be responsible for the care, maintenance of and any damage to all Water Facilities which have not been accepted by VID, except any damage caused by the active negligence of VID, its agents, employees or representatives.
VID shall not be required to accept the Water Facilities or any portion thereof until all Water Facilities have been completed to VID’s satisfaction. Furthermore, VID shall be permitted to use and operate any portion of the Water Facilities completed sufficiently to pass all field tests, after being placed into service by VID.
3-13.3 Warranty.
Replace the first paragraph in this subsection with the following:
The Work shall be warranted by the Contractor against defective materials and workmanship for a period of one (1) year, or longer as specified below:
a) The warranty period for installed fiber optic cable shall be two (2) years. b) The warranty period for the Work under Section 500 must be at least three (3) years. c) The warranty period for LED signal modules requires at least three (3) years of manufacturer’s warranty.
d) The warranty period for LED luminaires requires at least ten (10) years of manufacturer’s warranty. Provide documentation verifying that the LED luminaire model(s) being offered for the Project are covered by the ten-year warranty.
The warranty period shall begin when the Work is accepted as complete by the Agency after the Notice of Completion has been recorded at the County Recorder’s Office.
Replace the last paragraph in this subsection with the following:
If at any time during the warranty period, or during the extended warranty period specified, the Engineer finds the Work, or any part of the Work, to be defective or not in conformance with the plans and specifications, whether or not manufactured, fabricated, installed, completed or overlooked and accepted by the Engineer, the Contractor must, in accordance with the Engineer’s written instructions and within the specified time limits, either correct the defective or non-conforming Work, or, if it has 08/11/2026 C11 210 of 436
99 been rejected by the Engineer, remove it from the Site and replace it with non-defective and conforming Work.
The Engineer may determine in its sole discretion to accept defective work in lieu of requiring the Contractor to correct or remove and replace the defective work. However, the Contractor must bear all direct and indirect costs of the defective work, and the diminished value to the Project, as determined by the Engineer. If the Engineer’s acceptance of defective work occurs prior to Final Payment, the Engineer will issue a Change Order incorporating the necessary revisions in the Contract Documents with respect to the defective work and affording the Agency the appropriate decrease in the Contract Price.
If the Contractor fails to correct, remove, or replace defective work or non-conforming work within five (5) Working Days from the date of written notice from the Engineer, the Engineer may proceed expeditiously with any correction undertaken in accordance with this section. The Agency may remedy after five (5) Working Days from the date of written notice when the Contractor fails to correct the Work in accordance with the Contract Documents, or when he fails to comply with any other provision of the Contract Documents. If, in the opinion of the Agency, the non-conforming work or defective work creates a dangerous condition or requires immediate attention or correction to prevent further loss to the Agency or any other party, or to prevent interruption of operation of any Agency service or any service of any other party, The Agency will attempt to give notice required by this paragraph. If the contractor cannot be contacted or does not comply with the Agency’s request for correction within a reasonable time determined by the Agency, then the Agency or other party may proceed to provide attention or make required corrections, and the cost of all correction or attention shall be charged to and paid for by the Contractor. The Agency may remedy immediately in the event of an emergency.
When undertaking remedial action under this section, the City may: exclude the Contractor from all or part of the Site; take possession of all or part of the Work, and suspend the Contractor’s Work and or Services; and incorporate into the Project all materials and equipment stored at the Site or for which the City has paid but the Contractor has stored elsewhere.
The City will not allow an extension of the Contract Time or milestones because of any delay in the performance of the Project attributable to the City’s undertaking remedial action to correct Defective Work.
For Building Projects which require a certificate of occupancy, not including sewer and water facilities, if the Contractor fails to correct the defective work listed on the Agency’s “Punchlist” within forty-five (45) Working days after the Contract Time, he must reimburse the Agency for all costs to provide inspection services required to monitor Work beyond the forty-five (45) days. The Agency will bill the Contractor for the additional inspection at the Agency’s established rates.
If the Contractor completes the Project or portions of the Project prior to the Notice of completion (NOC), he must preserve equipment by developing and implementing a preventive maintenance program in compliance with manufacturer's recommendations.
The Contractor must repair or replace the traffic signal and lighting system equipment within seventy-two (72) hours after notification of defects by the Engineer.
08/11/2026 C11 211 of 436
100
The Contractor must pay for any claims, costs, losses, and damages incurred by the Agency in remedying any deficiency (e.g., all costs of repair or replacement of Defective Work and all costs of repair of any other Work on the Project destroyed or damaged by correction, removal, or replacement of your Defective Work).
Add the following paragraphs to this subsection:
Replacement of earthfill or backfill, where it has settled below the required finish surfaces, shall be considered part of repairs of defective work, and any repair of surfacing constructed by the Contractor, which becomes necessary because of settlement or ground movement, shall be likewise considered part of such repair work.
Any existing improvements which are damaged by the Contractor’s operations, or any new work, including concrete, which is cracked, chipped, discolored, improperly finished, heaved, vandalized, or for any other reason does not conform to the specifications, shall be replaced by the Contractor at no additional cost to the Agency.
The parties agree that no certificate given, with the exception of the certificate of final payment, shall be conclusive evidence of the faithful performance of the Contract, either in whole or in part, and that no payment shall be construed to be in acceptance of any defective work or improper materials.
Further, the certificate of final payment shall not terminate the Contractor’s obligations under his warranty herein above. The Contractor agrees that payment of the amount due under the Contract and the adjustments and payments due for any work done in accordance with any alterations of the same, shall release the Agency, the Agency’s Council and its officials, officers and employees from any and all claims or liability on account of work performed under the Contract or any alteration thereof.
No materials, supplies, or equipment for the Work under this Contract shall be purchased subject to any chattel mortgage or under a conditional sale contract or other agreement or supplier. The Contractor warrants clear and good title to all materials, supplies, and equipment installed and incorporated in the Work and agrees upon completion of all work to deliver the premises, together with all improvements and appurtenances constructed or placed thereon by the Contractor, and further agrees that neither the Contractor nor any person, firm or corporation furnishing any material or labor for any work covered by the Contract shall have any right to a lien upon the premises or any improvement or appurtenance thereon, provided that this shall not preclude the Contractor from installing metering devices or other equipment of utility companies the title of which is commonly retained by the utility company. Nothing contained in this article, however, shall defeat or impair the right of such persons furnishing materials or labor under any bond given by the Contractor for their protection, or any right under any law permitting such persons to look to funds due the Contractor, which are in the hands of the Agency. The provisions of this article shall be inserted in all subcontracts and material contracts, and notices of its provisions shall be given to all persons furnishing materials for the Work when no formal contract is entered into for such materials.
With respect to all warranties, express or implied, from Subcontractors, manufacturers, or suppliers for Work performed and materials furnished under this Contract, the Contractor shall:
a) Obtain for Agency all warranties that would be given in normal commercial practice; b) Require all warranties to be executed, in writing, for the benefit of the Agency or other parties; and
08/11/2026 C11 212 of 436
101
c) Enforce all warranties for the benefit of the Agency or other parties, unless otherwise authorized in writing by the Agency.
This subsection shall not limit the Agency’s rights under this Contract or with respect to latent defects, gross mistakes, or fraud. The Agency specifically reserves all rights related to defective work, including but not limited to the defect claims pursuant to California Code of Civil Procedure Section 337.15.
3-14 SITE EXAMINATION.
Add the following new subsection:
3-14 SITE EXAMINATION. The Contractor shall have the sole responsibility of satisfying itself concerning the nature and location of the Work, and the general and location conditions, such as, but not limited to, all other matters which could in any way affect the Work or the costs thereof. The failure of the Contractor to acquaint itself with all available information regarding any applicable existing or future conditions shall not relieve it from the responsibility for properly estimating the difficulties, responsibilities, or costs of successfully performing the Work according to the Contract Documents.
3-15 FLOW AND ACCEPTANCE OF WATER.
Add the following new subsection:
3-15 FLOW AND ACCEPTANCE OF WATER. Storm, surface, nuisance, or other waters may be encountered at various times during construction of the Work. Therefore, the Contractor, by submitting a Bid, hereby acknowledges that it has investigated the risk arising from such waters, has prepared its Bid accordingly, and assumes any and all risks and liabilities arising there from.
3-16 NOTICE OF THIRD PARTY CLAIMS.
Add the following new subsection:
3-16 NOTICE OF THIRD PARTY CLAIMS. Pursuant to Public Contract Code Section 9201, the Agency will provide Contractor with timely notification of the receipt of any third-party claim relating to the Contract. Contractor shall attempt to verify and resolve claims promptly.
3-17 SEPARATE CONTRACTS.
Add the following new subsection:
3-17 SEPARATE CONTRACTS. The Agency reserves the right to let other contracts in connection with this Work or on the Project site. Contractor shall permit other contractors reasonable access and storage of their materials and execution of their work and shall properly connect and coordinate its Work with theirs.
08/11/2026 C11 213 of 436
102
To ensure proper execution of its subsequent Work, Contractor shall immediately inspect work already in place and shall at once report to the Engineer any problems with the work in place or discrepancies with the Contract Documents.
Contractor shall ascertain to its own satisfaction the scope of the Project and nature of any other contracts that have been or may be awarded by the Agency in prosecution of the Project to the end that Contractor may perform this Contract in the light of such other contracts, if any. Nothing herein contained shall be interpreted as granting to Contractor exclusive occupancy at site of the Project.
Contractor shall not cause any unnecessary hindrance or delay to any other contractor working on the Project. If simultaneous execution of any Contract for the Project is likely to cause interference with performance of some other contract or contracts, the Engineer will decide which Contractor shall cease Work temporarily and which contractor shall continue or whether work can be coordinated so that contractors may proceed simultaneously. The Agency shall not be responsible for any damages suffered or for extra costs incurred by Contractor resulting directly or indirectly from award, performance, or attempted performance of any other contract or contracts on the Project site.
SECTION 4 – CONTROL OF MATERIALS
4-1 GENERAL.
Replace this subsection with the following:
4-1 GENERAL. It is the intent of the Agency in drafting the Contract Documents to accept only first class work, materials, parts, equipment and workmanship. All materials, parts and equipment furnished by Contractor for the Work shall be new, high grade, free from defects, of specified kind and fully equal to samples when such samples are required. Used or secondhand materials, parts and equipment may be used only if permitted by the Specifications. When the quality or kind of material or articles required under the Contract are not particularly specified, the Contractor shall provide those representing the best of their class or kind. Quality of work shall be in strict accordance with generally accepted standards. Materials, parts and equipment shall be furnished in such quantities, kinds and at such times as to ensure uninterrupted progress of the Work.
The quality of material, parts, equipment and work shall be subject to approval by the Engineer.
The Engineer shall have access to the Work at all times during construction, and shall be furnished with every reasonable facility for securing full knowledge with regard to the progress, workmanship and character of the materials, parts and equipment used or employed in the Work. Materials and workmanship of a quality not conforming to the requirements of the Specifications shall be considered defective, and shall be subject to rejection. Defective work or material, whether in place or not, shall be remedied or removed and replaced by the Contractor, at its expense, and defective materials shall be removed from the Work site immediately, at the Contractor’s expense, when so directed by the Engineer.
Any work done beyond the lines shown on the Plans or established by the Engineer, or any Extra Work done without written authority, will be considered unauthorized and will not be paid for by Agency.
Upon Contractor’s failure to comply promptly with any order of the Engineer made under the provisions of this Section, the Engineer shall have authority to cause such defective or unauthorized work to be remedied or removed and replaced, and to deduct the costs thereof from any monies due or to become 08/11/2026 C11 214 of 436
103
due the Contractor. If the Work is found to be in compliance with these Specifications, the Engineer will furnish the Contractor with a certificate to that effect.
No rejected materials, the defects of which have been subsequently corrected, shall be used until approval in writing has been given by the Engineer. Upon failure of the Contractor to comply with any order of the Engineer made under the provisions of this subsection, the Engineer shall have the authority to remove and replace defective materials and to deduct the cost of removal and replacement from any monies due or to become due the Contractor.
If, during the prosecution of the work, the Contractor fails to immediately correct the defective or non-conforming work upon notice, or fails to correct the defective or non-conforming work in a manner conforming to the Contract Documents, the Engineer may order the Contractor to stop all or part of the Project. The Agency’s right to stop the Project does not give rise to any duty on the Agency’s part to stop Work for the Contractor’s benefit or the benefit of any other party. The Contractor shall bear all direct and indirect costs and damages that result from the Agency’s stop work notice.
When removing asbestos products, the Contractor shall comply with the requirements of Title 8, CCR, General Industry Safety Orders and Construction Safety Orders.
4-1.1 Agency-furnished Materials.
Add the following new subsection:
4-1.1 Agency-furnished Materials. The Agency may provide certain items (e.g. traffic signal poles, mast arms, meter pedestals, street lights, etc.) for use by the Contractor for this Project at no cost to the Contractor as described in the Special Provisions. The Contractor shall inspect the materials / equipment prior to submitting a bid and shall satisfy himself of the suitability of the materials / equipment for use on the Project, and include all costs in the bid. The Contractor shall provide all hardware and any other materials, equipment and appurtenances necessary to use the Agency- furnished items in the Work.
Upon written request from the Contractor at least twenty-four (24) hours in advance, any materials / equipment furnished by the Agency for the Project shall be available to the Contractor to take delivery of the items during regular Public Works Department Working Hours at the Agency’s Public Works Yard at 1165 E. Taylor Street or the Agency’s Storage Yard at 2430 Lupine Hills Drive as designated by the Agency. The Contractor shall inspect the materials / equipment at time of pick-up and shall satisfy himself of the suitability and quantity of the materials / equipment for use on the Project. The Contractor shall provide loading at the Agency’s designated location, handling, transportation and delivery of the items to the Project site. The cost of handling and placing all materials / equipment after they are made available to the Contractor shall be considered as included in the Contract prices for items in connection with which they are used. No markup shall be applied to any material provided by the Agency.
The Contractor shall assume full responsibility for all Agency-furnished materials and/or equipment made available to him as soon as loading commences. Deductions will be made from any monies due to the Contractor to make good any shortages and deficiencies, from any cause 08/11/2026 C11 215 of 436
104
whatsoever, which may occur after said materials and/or equipment have been furnished to the Contractor.
4-3 INSPECTION.
4-3.1 General.
Modify the first paragraph to read as follows:
4-3.1 General. Unless otherwise specified in these Specifications, inspection may be required at the source for such typical materials and fabricated items including, but not limited to, bituminous paving mixtures, structural concrete, precast concrete, street lighting poles, metal fabrication, metal casting, welding, concrete pipe manufacture, protective coating application, plastic liner, fiberglass tanks, plastic liner pipe, and similar shop or plant operations.
Modify the third sentence of the second paragraph to read as follows:
Special items of equipment such as designed electrical panel boards, large pumps, sewage plant equipment, etc., are subject to inspection at the source.
4-4 TESTING.
Add the following paragraphs to this subsection:
Geotechnical (soil) testing of fill materials, subgrade, subbase, and base will be conducted by the Agency and the Geotechnical Engineer. Geotechnical (soil) tests may include relative compaction tests, sand equivalents tests, sieve analysis, R-values, etc. The results shall be presented directly by the laboratory to the Engineer. No base, concrete or pavement shall be placed before the subgrade, subbase, base and fill have been compacted, tested and approved. The cost of any initial geotechnical (soil) test shall be borne by the Agency. Additional geotechnical (soil) tests necessitated by a failure of one (1) or more of the initial tests shall be made by the laboratory at the expense of the Contractor.
The Contractor shall make allowances in his construction procedure to permit testing of the Work in progress by the Engineer and no additional compensation shall be paid to the Contractor for delays due to testing.
Testing of any cast-in-place structure or concrete surface improvement will be conducted by the Agency. Concrete tests may include slump tests, air content, and compressive strength. Any results shall be presented directly by the laboratory to the Engineer. The cost of any initial concrete test shall be borne by the Agency. Additional concrete tests necessitated by a failure of one (1) or more of the initial tests shall be made by the laboratory at the expense of the Contractor. The Contractor shall make allowances in his construction procedure to permit testing of the Work in progress by the Engineer and no additional compensation shall be paid to the Contractor for delays due to testing.
The Contractor shall maintain and secure all material samples on the Project site, available to the Engineer for inspection and evaluation during normal working hours.
08/11/2026 C11 216 of 436
105
All packaged, manufactured products / materials for use on the Work shall be delivered to the Project site in their original unopened containers, bearing thereon the manufacturer’s name and the brand name of the product.
Wherever any product / material is selected to be used on the Work, all such products or materials shall be of the same brand and manufacturer throughout the Work.
All products / materials shall be stored in such a manner that they will be completely protected from weather damage.
The Contractor shall pay for all failing tests that the Contractor or the Agency’s representative request in conformance with the referenced specifications or as enumerated in the supplementary provisions.
4-6 TRADE NAMES:
Add the following paragraphs to this subsection:
In accordance with the provisions of Section 3400 of the California Public Contract Code, the Contractor shall be provided a period of not less than seven (7) Working Days after award of the Contract for submission of data substantiating a request for a substitution of an "equal" item. Data submitted after this time period may be rejected by the Agency.
The Contractor shall substantiate his offer for use of substitute materials, processes, or equipment, which he considers to be equivalent to that indicated, by submitting three (3) copies of a package of description, information, and performance data, showing the equality of the offered item, and such other necessary or related information as may be required by the Engineer (including, but not limited to, complete calculations, technical specifications, samples, or published documents relating to the performance and physical characteristics of the proposed substitute). The burden of proof as to the comparative quality and suitability of alternative material, process, or equipment shall be the Contractor’s responsibility. Independent testing or evaluation at qualified test facilities, including destructive testing, may be required as a condition of acceptance. Life cycle costs of the substitute items must be equivalent to those of the items indicated. The Engineer may require the Contractor to furnish a special performance warranty or other surety with respect to any proposed substitute. The Engineer shall be the sole judge as to the comparative quality and suitability of the substitute items, and the Engineer’s decision shall be final.
The Contractor’s offer of the substitute items shall contain the following statements and/or information that shall be considered by the Engineer in evaluating the proposed substitution:
1. A statement that the evaluation, and acceptance or rejection of the proposed substitute, will not prejudice the Contractor’s completion of the Project in the specified time.
2. A statement as to whether or not acceptance of the proposed substitute will require a change in the Contract Documents.
3. A list identifying all variations of the proposed substitute from that specified.
4. A description of available maintenance, repair, and replacement service. 08/11/2026 C11 217 of 436
106
5. An itemized estimate of all costs or credits that will result directly or indirectly from acceptance of the proposed substitute, including redesign and claims from others.
4-9 REMOVAL OF INTERFERING OBSTRUCTIONS.
Add the following new subsection:
4-9 REMOVAL OF INTERFERING OBSTRUCTIONS. The Contractor shall remove and dispose of all debris, abandoned structures, tree roots and obstructions of any character met during the process of excavation, it being understood that the cost of said removals are made a part of the unit price bid by the Contractor under other various items of work.
4-10 PROCEDURE IN CASE OF DAMAGE TO PUBLIC PROPERTY.
Add the following new subsection:
4-10 PROCEDURE IN CASE OF DAMAGE TO PUBLIC PROPERTY. Any portions of curb, gutter, sidewalk or any other City improvement not identified for removal but damaged by the Contractor during the course of construction shall be replaced by the Contractor at the Contractor’s own cost, at no additional charge to the Agency. The cost of additional replacement of curb, gutter or sidewalk in excess of the estimated quantities shown in the BID SCHEDULE and Specifications and found necessary during the process of construction (but not due to damage resulting from carelessness on the part of the Contractor during construction operations), shall be paid to the Contractor at the unit prices submitted in the Bid.
SECTION 5 – LEGAL RELATIONS AND RESPONSIBILITIES
5-3 LABOR.
5-3.1 General.
Add the following paragraphs to this subsection:
No contractor or subcontractor of any tier may be awarded a Contract for public work on a public works project or work on a public works project without proof of registration with the Department of Industrial Relations pursuant to Labor Code section 1725.5.
Registrations under Section 1725.5 expire annually at the end of June, and Contractor is responsible for verifying the renewal status of each subcontractor, of any tier, working on this Contract, and providing City with an updated list of all subcontractors and their registration status.
Subcontractors who do not timely renew their registration must be removed from the job site until they are registered. The removal of a subcontractor for failure to be registered shall not be cause for any extension of time or additional compensation of any nature under the Contract.
08/11/2026 C11 218 of 436
107
In accordance with the requirements of Section 1771.1(j) of the Labor Code, the Agency will observe and enforce any Stop Order issued by the Labor Commissioner where a contractor or subcontractor engages in the performance of any public work Contract without having been registered in violation of the requirements of Section 1725.5 or this section, and will not allow the unregistered contractor or the unregistered subcontractor to work on any public works until the unregistered contractor or unregistered subcontractor is registered.
In accordance with the provisions of Section 1771.4(a)(1) of the California Labor Code, this project is subject to compliance monitoring and enforcement by the Department of Industrial Relations.
In accordance with the provisions of Section 1771.4(a)(2) of the California Labor Code, the prime contractor shall post job site notices, as prescribed by regulation.
5-3.2 Prevailing Wages.
Replace this subsection with the following paragraphs:
Pursuant to the Vista City Charter and the Vista Municipal Code, payment of prevailing wages and compliance with the California Labor Code Sections 1770 et seq IS required for this Project.
State prevailing rates of wages and classifications, as applicable to this contract, are ascertained and adopted by the State of California, Director of Industrial Relations (DIR) pursuant to California Labor Code Article 2 of Chapter 1 of Part 7 of Division 2, as amended, which is made a part herein, and the provisions of Section 1777.5 and 1777.6 of the Labor Code concerning the employment of apprentices by the Contractor or any subcontractor under him. Certified payroll on an approved compliance format is required for all work under this Contract.
Pursuant to Section 1773 of the Labor Code, the general prevailing wage rates in the county, or counties, in which the Work is to be done have been determined by the Director of the California Department of Industrial Relations (DIR). These wages are set forth in the General Prevailing Wage Rates for this Project, available at the California Department of Industrial Relations’ (DIR) Internet URL website link at:
http://www.dir.ca.gov/DLSR/PWD
When the Contractor intends to use a craft or classification not shown in the wage provisions, it will be required to pay the wage rate of that craft or classification most closely related to that craft or classification as shown on the wage provisions. In case of disagreement between the Contractor and the Agency, the Engineer shall decide the prevailing wages for the labor.
The Contractor shall comply with the provisions of California Labor Code Section 1773.8 which requires the payment of travel and subsistence payments to each worker needed to execute the work to the extent required by law.
The Contractor shall, as a penalty to the Agency, forfeit not more than fifty dollars ($50) for each calendar day, or portion thereof, for each worker paid less than the prevailing rates as determined by 08/11/2026 C11 219 of 436
108
the Director of Industrial Relations for the work or craft in which the worker is employed for any public work done under the Contract by Contractor or by any subcontractor.
For projects using Federal funds, the Federal minimum wage rates used for the project are those predetermined by the United States Secretary of Labor within ten (10) Working Days before the bid opening. These wages are available at the United States Secretary of Labor website link at:
http://www.dir.ca.gov/DLSR/PWD
The state prevailing wage determination used for this Project is the latest determination on the bid advertising date. The federal wage determination used for this Project is the latest determination ten (10) Working Days before the bid opening. Within ten (10) days before the bid opening an addendum will be issued to holders of Plans and Project Specifications containing the latest Federal prevailing wage rate determinations to be used for the Project.
Attention is directed to the Federal minimum wage rate requirements. On Federally funded projects, if there is a difference between the minimum wage rates predetermined by the Secretary of Labor and the general prevailing wage rates determined by the Director of the California Department of Industrial Relations (DIR) for similar classifications of labor, the Contractor and subcontractors shall pay not less than the higher wage rate. The Agency will not accept lower State wage rates not specifically included in the Federal minimum wage determinations. This includes “helper” (or other classifications based on hours of experience) or any other classification not appearing in the Federal wage determinations. Where Federal wage rate determinations do not contain the State wage rate determinations otherwise available for use by the Contractor and subcontractors, the Contractor and subcontractors shall pay not less than the Federal minimum wage rate which most closely approximates the duties of the employees in question.
5-3.2.1 Apprentices.
Add the following new subsection:
5-3.2.1 Apprentices. Attention is directed to the provisions of Section 1777.5 and 1777.6 of the labor Code concerning the employment of apprentices by the Contractor or any Subcontractor under him/her. The Contractor and any Subcontractor under him/her shall comply with the requirements of said sections in the employment of apprentices.
The Agency will provide notice to the Department of Industrial Relations of any public works Contract using the online PWC-100 form. The online PWC-100 form is also transmitted to the Department of Apprenticeship Standards (DAS) to inform them of the award of a contract. The Contractor and each subcontractor shall also submit a “Public Works Contract Award Information” form (DAS form 140) to inform all applicable apprenticeship committees of the award of a contract.
The Contractor and each subcontractor shall provide written evidence to the Agency that the request for dispatch of apprentices to the training agencies has been completed using the DAS 142 form.
Contributions to a training fund, or the California Apprenticeship Council, for every worker on the job, are required.
08/11/2026 C11 220 of 436
109
The Contractor and all subcontractors shall submit to the Agency copies of the “Public Works Contract Award Information” forms (DAS form 140) and all requests for dispatch of apprentices on the DAS 142 form. These DAS forms are available from the California Department of Industrial Relations’ (DIR) Division of Apprenticeship Standards website link at:
http://www.dir.ca.gov/DAS/das.html
The Contractor is not required to use apprentices on projects under thirty thousand Dollars ($30,000).
5-3.3 Payroll Records.
Add the following paragraph to this subsection:
In accordance with the requirements of the California Prevailing Wage Laws, Contractor and each Subcontractor shall keep an accurate payroll record, showing the name, address, social security number, work classification, straight time, and overtime hours worked each day and week, and the actual per diem wages paid to each journeyman, apprentice, worker, or other employee employed by him or her in connection with the work. The payroll records shall be certified and submitted to the DIR electronically in accordance with the California Prevailing Wage Laws. Contractor shall be subject to, and fully comply with, all California Prevailing Wage Laws, including, but not limited to, those pertaining to the maintenance and inspection of certified payroll records. Copies of the record of wages paid shall be certified by the Contractor and submitted to the DIR with each progress payment request. In the event of noncompliance with the requirements of this section for payroll records, and upon the request of the DIR, contractor penalties shall be withheld from Contract payments.
5-4 INSURANCE.
5-4.1 General.
Delete this subsection in its entirety and replace with the following:
The Contractor shall procure and maintain for the duration of the Contract, insurance against claims for injuries to persons or damages to property which may arise from or in connection with the performance of the work hereunder by the Contractor, his agents, representatives, employees, or subcontractors.
Without limiting the Contractor's indemnification, it is agreed that the Contractor shall maintain in force at all times the following policy, or policies, of insurance covering its operations:
(a) Commercial General Liability (CGL) -- Insurance Work Office Form CG 00 01 covering CGL on an “occurrence” basis, including products, completed operations, property damage, bodily injury, and personal & advertising injury with limits no less than $2,000,000 per occurrence. If a general aggregate limit applies, either the general aggregate limit shall apply separately to this Project/location or the general aggregate limit shall be twice the required occurrence limit.
08/11/2026 C11 221 of 436
110
(b) Automobile Liability -- Insurance Work Office Form Number CA 0001 covering Code 1 (any auto), with limits no less than $2,000,000 per accident for bodily injury and property damage. Any and all mobile equipment, including cranes, which are not covered under Automobile Liability, shall have said coverage provided for under Comprehensive General Liability policy.
If the contractor maintains higher limits than the minimums shown above, the City requires and shall be entitled to coverage for the higher limits maintained by the contractor. Any available insurance proceeds in excess of the specified minimum limits of insurance and coverage shall be available to the City.
Any deductibles or self-insured retentions must be declared to and approved by the City. At the option of the City, either: the contractor shall cause the insurer shall reduce or eliminate such deductibles or self-insured retentions as respects the City, its officers, officials, employees, and volunteers; or the Contractor shall provide a financial guarantee satisfactory to the City guaranteeing payment of losses and related investigations, claim administration, and defense expenses.
Certificates of insurance and a complete copy of the insurance policies evidencing the coverages required by the clauses set forth above shall be filed with the Agency prior to the effective date of this Agreement. This is a condition precedent to the formation of any obligation by the Agency to compensate the Contractor under this Agreement.
The insurance policies are to contain, or be endorsed to contain, the following provisions:
1. The City, its officers, officials, employees, and volunteers are to be covered as additional insureds on the CGL policy with respect to liability arising out of with respect to liability arising out of work or operations performed by or on behalf of the Contractor including materials, parts, or equipment furnished in connection with such work or operations and automobiles owned, leased, hired, or borrowed by or on behalf of the Contractor. General liability coverage can be provided in the form of an endorsement to the Contractor’s insurance (at least as broad as ISO Form CG 20 10, CG 11 85 or both CG 20 10 and CG 20 37 forms if later revisions used), unless otherwise approved in advance by City.
2. For any claims related to this Project, the Contractor’s insurance coverage shall be primary insurance as respects the City, its officers, officials, employees, and volunteers. Any insurance or self-insurance maintained by the City, its officers, officials, employees, or volunteers shall be excess of the Contractor’s insurance and shall not contribute with it.
3. Each insurance policy required by this clause shall provide that coverage shall not be canceled, except with notice to the City.
Contractor may submit evidence of Builder’s Risk insurance in the form of Course of Construction coverage. Such coverage shall name the City as a loss payee as their interest may appear. If the Project does not involve new or major reconstruction, at the option of the City, an Installation Floater may be acceptable. For such Projects, a Property Installation Floater shall be obtained that provides for the improvement, remodel, modification, alteration, conversion or adjustment to existing buildings, structures, processes, machinery and equipment. The Property Installation Floater shall provide property damage coverage for any building, structure, machinery or equipment damaged, impaired, broken, or destroyed during the performance of the Work, including during transit, installation, and testing at the City’s site.
08/11/2026 C11 222 of 436
111
If any coverage required is written on a claims-made coverage form:
1. The retroactive date must be shown, and this date must be before the execution date of the Contract or the beginning of Contract work.
2. Insurance must be maintained and evidence of insurance must be provided for at least five (5) years after completion of Contract work.
3. If coverage is canceled or non-renewed, and not replaced with another claims-made policy form with a retroactive date prior to the Contract effective date, or start of work date, the Contractor must purchase extended reporting period coverage for a minimum of five (5) years after completion of Contract work.
4. A copy of the claims reporting requirements must be submitted to the City for review.
5. If the services involve lead-based paint or asbestos identification/remediation, the Contractors Pollution Liability policy shall not contain lead-based paint or asbestos exclusions. If the services involve mold identification/remediation, the Contractors Pollution Liability policy shall not contain a mold exclusion, and the definition of Pollution shall include microbial matter, including mold.
Insurance is to be placed with insurers with a current A.M. Best rating of no less than A: VII, unless otherwise approved by the City.
Contractor hereby agrees to waive rights of subrogation which any insurer of Contractor may acquire from Contractor by virtue of the payment of any loss. Contractor agrees to obtain any endorsement that may be necessary to affect this waiver of subrogation. The Workers’ Compensation policy shall be endorsed with a waiver of subrogation in favor of the City for all work performed by the Contractor, its employees, agents and subcontractors.
Contractor shall furnish the City with original certificates and amendatory endorsements, or copies of the applicable insurance language, effecting coverage required by this Contract. All certificates and endorsements are to be received and approved by the City before work commences. However, failure to obtain the required documents prior to the work beginning shall not waive the Contractor’s obligation to provide them. The City reserves the right to require complete, certified copies of all required insurance policies, including endorsements, required by these specifications, at any time.
Contractor shall require and verify that all subcontractors maintain insurance meeting all the requirements stated herein, and Contractor shall ensure that City is an additional insured on insurance required from subcontractors. For CGL coverage, subcontractors shall provide coverage with a format least as broad as CG 20 38 04 13.
Contractor agrees to assist in every manner possible in the reporting and investigation of any accident and, upon request, to cooperate with all interested insurance carriers in the handling of any claim by securing and giving evidence and obtaining the attendance of witnesses as required for the resolution of any claim or lawsuit.
Nothing contained in these insurance requirements is to be construed as limiting the type, quality or quantity of insurance that the Contractor should maintain, or the extent of the Contractor's responsibility or liability for payment of damages resulting for the Contractor's operations under the contract. The carrying of the insurance specified herein shall not be construed to be a limitation of liability on the part of the Contractor or as a matter of law.
08/11/2026 C11 223 of 436
112
5.4.2 General Liability Insurance
Delete this subsection in its entirety
5.4.4 Auto Liability Insurance
Delete this subsection in its entirety
5-4.5 Failure to Procure Insurance.
Add the following new subsection:
5-4.5 Failure to Procure Insurance. Contractor’s failure to procure or maintain required insurance program shall constitute a material breach of Contract under which the Agency may immediately terminate the Contract or, at its discretion, procure or renew such insurance to protect the Agency’s interests and pay any and all premiums in connection herewith, and recover all monies so paid from Contractor, or deduct all monies so paid from payments due Contractor.
5-6 PATENT FEES OR ROYALTIES.
Delete the subsection in its entirety and replace with the following:
The Contractor shall absorb in its Bid all costs arising from the use of patented materials, equipment, devices, or processes used in or incorporated in the Work and agrees to indemnify and hold harmless the Agency and its duly authorized representatives, from all suits of law, or actions of every nature for or on account of the use of any patented materials, equipment, devices or processes.
5-7 SAFETY.
5-7.2 Safety Orders.
5-7.2.1 General.
Add the following paragraphs to this subsection:
In accordance with generally accepted construction practices, the Contractor shall be solely and completely responsible for conditions of the job site, including safety of all persons and property during performance of the Work, and the Contractor shall fully comply with all OSHA, State and Federal laws, rules, regulations and orders relating to safety of the public and workers.
Whenever, in the opinion of the Engineer, an emergency exists against which the Contractor has not taken sufficient precaution for the public safety, protection of utilities and protection of adjacent structures or property which may be damaged by the Contractor’s operations, and when in the opinion 08/11/2026 C11 224 of 436
113
of the Engineer, immediate action shall be considered necessary in order to protect the public or property adjacent to the Contractor’s operations under this contract, the Engineer will order the Contractor to provide a remedy for the unsafe condition. If the Contractor fails to act on the situation, the Engineer may provide suitable protection to said interests by causing such work to be done and material to be furnished as may be necessary.
The cost and expense of said labor and material, together with the cost and expense of such repairs as are deemed necessary, shall be borne by the Contractor. All expenses by the Agency for emergency repairs will be deducted from the progress payments and the final payments due to the Contractor. However, if the Agency does not take such remedial measures, the Contractor is not relieved of the full responsibility for public safety.
The acceptance by the Agency of a copy of the State of California Department of Industrial Relations Division of Occupational Safety & Health (CalOSHA) permit to perform excavation or trench work shall in no way be construed to impose tort liability on the Agency or any of its officers or employees by reason of any damage to person, including death or property damage resulting from or arising out of the use of such plan, and the Contractor shall be fully responsible for any such damage and shall indemnify and hold harmless the Agency, its officers and employees from any loss or liability resulting from the use of such plan.
5-7.8 Steel Plate Covers.
5-7.8.1 General.
Add the following paragraphs to this subsection:
The surface of all structural steel plate covers used by the Contractor to bridge any excavation in the public right-of-way shall have a non-skid coating (“Skid Guard” or equal) with a minimum coefficient of friction = 0.35 per California Test Method 342 for all traffic steel plate covers within the traveled roadway of streets and alleys, and a minimum coefficient of friction of 0.50 per ASTM C 1028 for those steel plate covers in pedestrian crosswalks or accessible areas. The non-skid coating shall be black.
When required by the Engineer, the Contractor shall certify in writing to the Agency that the steel plate covers to be used in the Work meet the required static coefficient of friction. Also, when required by the Engineer, the Contractor shall have the steel plate covers to be used in the Work tested in accordance with the above standards for the verification of the required static coefficient of friction.
Testing shall be done by an independent laboratory approved by the Engineer. The Contractor shall pay for any costs associated with the testing of the steel plate covers.
5-8 RESPONSIBILITY FOR DAMAGE.
Add the following new subsection:
5-8 RESPONSIBILITY FOR DAMAGE. In addition to the provisions of Subsection 5-4 (“INSURANCE of the Standard Specifications as between the Agency and the Contractor, the Contractor shall take and assume all responsibility for the Work as stated herein and/or shown on the Plans.
08/11/2026 C11 225 of 436
114
The Contractor shall bear all losses and damages directly or indirectly resulting to him, to the Agency, the Engineer, their officers, employees, and agents, or to others on account of the performance or character of the work, unforeseen difficulties, accidents or any other causes whatsoever.
The Contractor shall assume the defense of and indemnify and save harmless the Agency, the Engineer, their officers, employees, and agents respectively from all claims, loss, damage, injury and liability of every kind, nature, and description, directly or indirectly arising from the performance of the Contract or work, regardless of responsibility for negligence; and from any and all claims, loss, damage, injury, and liability, howsoever the same may be caused, resulting directly or indirectly from the nature of the work covered by the Contract, regardless of responsibility for negligence.
The Agency does not, and shall not; waive any rights against the Contractor which it may have be reason of the aforesaid hold harmless agreements, because of the acceptance by the Agency or deposit with the Agency by Contractor, of any insurance policies required herein or as described in Subsection 5-4. The aforesaid hold harmless agreement by Contractor shall apply to all damages and claims for damages of every kind suffered, or alleged to have been suffered by reason of any of the aforesaid operations of Contractor, or any Subcontractor, regardless of whether or not such insurance policies are determined to be applicable to any of such damages or claims for damages.
No act by the Agency, Engineer or their representatives in processing or accepting any plans, in releasing any bond, in inspecting or accepting any work, or of any other nature, shall in any respect relieve the Contractor or anyone else, from any legal responsibility, obligation or liability he might otherwise have.
5-9 INDEMNIFICATION.
Add the following new subsection:
5-9 INDEMNIFICATION. Contractor shall defend (with counsel of Agency’s choosing), indemnify and hold the Agency, its officials, officers, agents, employees, and representatives free and harmless from any and all claims, demands, causes of action, costs, expenses, liabilities, losses, damages or injuries, in law or equity, regardless of whether the allegations are false, fraudulent, or groundless, to property or persons, including wrongful death, to the extent arising out of or incident to any acts, omissions or willful misconduct of Contractor, its officials, officers, employees, agents, consultants and contractors arising out of or in connection with the performance of the Work or this Contract, including claims made by Subcontractors for nonpayment, including without limitation the payment of all consequential damages and other related costs and expenses. Contractor shall defend, at Contractor’s own cost, expense and risk, with counsel of Agency’s choosing, any and all such aforesaid suits, actions or other legal proceedings of every kind that may be brought or instituted against Agency, its officials, officers, agents, employees and representatives. To the extent of its liability, Contractor shall pay and satisfy any judgment, award or decree that may be rendered against Agency, its officials, officers, employees, agents, employees and representatives, in any such suit, action or other legal proceeding. Contractor shall reimburse Agency, its officials, officers, agents, employees and representatives for any and all costs incurred by each of them in connection therewith or in enforcing the indemnity herein provided. The only limitations on this provision shall be those imposed by Civil Code Section 2782.
08/11/2026 C11 226 of 436
115
5-10 EMERGENCY PHONE NUMBERS.
Add the following new subsection:
5-10 EMERGENCY PHONE NUMBERS. The Contractor shall provide the Engineer an emergency contact name and telephone number prior to the start of the Work that may be used to contact the Contractor in the event of an emergency for the duration of the Contract. Contractor shall also keep a list of emergency telephone numbers on the job site. In the case that more than ten (10) employees are on the job site at any time, said list shall be posted on a bulletin board, to be supplied and installed on the job site by the Contractor in a location visible and accessible to all employees.
The following emergency telephone numbers are listed for the convenience of the Contractor to assist in complying with these requirements:
AGENCY PHONE NUMBER
City of Vista Fire Department (North County Dispatch) 858-756-3006 City of Vista Fire Department (Emergency) 911
San Diego County Sheriff’s Office (Emergency) 911
Tri-City Medical Center, 4002 Vista Way, Oceanside, CA 92056 911 San Diego Gas and Electric (Gas Emergency) 800-611-7343 San Diego Gas and Electric (Electrical Emergency) 800-411-7343
5-11 DOCUMENT RETENTION & EXAMINATION.
Add the following new subsection:
5-11 DOCUMENT RETENTION & EXAMINATION. In accordance with Government Code Section 8546.7, records of both the Agency and the Contractor shall be subject to examination and audit by the State Auditor General for a period of three (3) years after final payment. Contractor shall make available to the Agency any of the Contractor’s other documents related to the Project immediately upon request of the Agency.
In addition to the State Auditor rights above, the Agency shall have the right to examine and audit all books, estimates, records, contracts, documents, bid documents, subcontracts, and other data of the Contractor (including computations and projections) related to negotiating, pricing, or performing the modification in order to evaluate the accuracy and completeness of the cost or pricing data at no additional cost to the Agency, for a period of four (4) years after final payment.
5-12 STATE LICENSE BOARD NOTICE.
Add the following new subsection:
08/11/2026 C11 227 of 436
116
5-12 STATE LICENSE BOARD NOTICE. Contractors are required by law to be licensed and regulated by the Contractors’ State License Board which has jurisdiction to investigate complaints against contractors if a complaint regarding a patent act or omission is filed within four (4) years of the date of the alleged violation. A complaint regarding a latent act or omission pertaining to structural defects must be filed within ten (10) years of the date of the alleged violation. Any questions concerning a contractor may be referred to the Registrar, Contractors’ State License Board, P.O. Box 26000, Sacramento, California 95826.
SECTION 6 – PROSECUTION AND PROGRESS OF THE WORK
6-1 CONSTRUCTION SCHEDULE AND COMMENCEMENT OF WORK.
6-1.1 Construction Schedule.
Delete this subsection in its entirety and replace with the following:
6-1.1 Construction Schedule. Within ten (10) Working Days after execution of the Contract or at the Pre-Construction Meeting, and prior to the commencement of work, the Contractor shall submit its proposed construction schedule to the Engineer using a scheduling program (e.g. Microsoft Project, Oracle’s Primavera or other approved equal program capable of producing the required information).
The construction schedule shall be in the form of a tabulation, bar or Gantt chart, or graph satisfactory to the Engineer, and in sufficient detail to show chronological relationship of all activities on the Project. Said activities include, but are not limited to, estimated start and finish dates of all tasks that make up each bid item, submittal of shop drawings to the Engineer for approval, procurement of materials, and scheduling of equipment. Along with the construction schedule, the Contractor shall submit a cash-flow projection showing the anticipated amount of each monthly payment that will become due the Contractor in accordance with the construction schedule.
The Contractor shall schedule and stage the Work on all streets to cause the least possible inconvenience to vehicular traffic (including busses and trash vehicles), bicyclists, pedestrians, adjacent businesses, local residences and schools..
The Contract time listed in the Specifications is the Agency’s best estimate of how long it will take to complete the Work. The construction schedule shall reflect all Contract requirements, shall recognize the requirements of Subsection 402-5 (“DELAYS DUE TO UTILITY CONFLICTS.”), and shall reflect completion of all work under the contract, including Punchlist items, in the specified time and in accordance with the Project Specifications and Plans. No schedule shall call for completion of the Project before or after the Contract completion date. The Project owns the float time and is not for the exclusive benefit of any Party. As such, liability for delay of the project completion date rests with the party actually causing the delay to the project completion date. By way of the Contractor assigning activity durations and proposing the sequence of the work, the Contractor hereby agrees to utilize sufficient and necessary management and other resources to perform the work in accordance with the construction schedule.
A Notice to Proceed shall be issued after the Pre-Construction Meeting, provided the Storm Water Pollution Prevention Plan (SWPPP) and the Construction Staging / Traffic Control Plan have been submitted by the Contractor and accepted by the Engineer, and all other appropriate Contract 08/11/2026 C11 228 of 436
117
requirements are fulfilled. The Work shall start within ten (10) Working Days thereafter, and shall be diligently prosecuted to completion within the time provided in the Project Specifications.
For projects of forty-five (45) Working Days or more, the Contractor shall submit to the Engineer an updated construction schedule each month, showing the actual progress of the Work, as part of the Partial Payment request. Monthly progress payments are conditioned upon the Engineer receiving from the Contractor the monthly schedule update. Schedule updates must accurately reflect the “as- built” schedule. All changes to the schedule shall be highlighted or otherwise identified. Approved Change Orders shall also be incorporated in the updated schedule. It is highly recommended that a narrative be included with each update. The narrative should include a description of any logic changes made to the Project, a commentary as to gains and losses to critical and near critical activities, and a quantification of the gains and losses to the critical path. Failure to provide an updated construction schedule may result in withholding Contract payments until one is submitted.
If the Contractor desires to make a major change in the method of operations after commencing construction, or if the schedule fails to reflect the actual progress of the Work for any reason, the Contractor shall submit to the Engineer a revised construction schedule in advance of beginning revised operations. In the event that an action either by the Agency or the Contractor results in a delay to the schedule, it is beneficial if the parameters pertaining to that action are recorded as they happen.
6-1.3 Pre-Construction Meeting.
Add the following new subsection:
6-1.3 Pre-Construction Meeting. A Pre-Construction Meeting shall be scheduled after the award and prior to construction. The Contractor (Principal and Project Superintendent) and any subcontractor for five percent (5%) or more of the work shall attend and be prepared to provide or discuss the following information:
a) Construction schedule
b) Subcontractors
c) City of Vista Stormwater Permit and Storm Water Pollution Prevention Plan (SWPPP), if required d) Traffic Control Plans
e) Survey requirements
f) Materials and delivery schedule
g) Local phone numbers for supervisory personnel
h) List of Emergency phone numbers (see Subsection 7-17 of these Specifications) i) Required permits
j) Coordination with other agencies
The Construction Schedule to be provided shall be as described in Subsection 6-1.1 (“Construction Schedule.”) of these Supplementary General Provisions.
6-2 PROSECUTION OF THE WORK.
Add the following paragraph after the first paragraph in this subsection:
08/11/2026 C11 229 of 436
118
Contractor shall, at contractor’s sole cost and expense, be solely and completely responsible for all matters affecting the prosecution, progress and completion of the work (both on and off the job site), and for observing all laws and providing for public convenience and safety, safety of workers (including its workers and those of its subcontractors, suppliers and others contributing to the work) and others, protection of property and rights of others, including location, maintenance and replacement of utilities whether shown on the plans or not, prior notification to utility owners, drainage from storm runoff, and all easements right-of-way and encroachment permits. Nothing in the Agreement, the specifications, or other Contract Documents or AGENCY’s or VID’s approval of the plans and specifications, or inspection of the work is intended to include a review, inspection, acknowledgement of or responsibility for any such matters and AGENCY or VID, AGENCY’s engineer or VID’s engineer, and their consultants, and each of their directors, officers, employees and agents, shall have absolutely no responsibility or liability therefore.
6-3 TIME OF COMPLETION.
6-3.1 General.
Replace this subsection with the following:
6-3.1 General. The Contractor shall complete all portions of the Work, including Punchlist items, in accordance with the terms and conditions of the Contract Documents, within the number of days stated in the Notice Inviting Bids from the date of the Notice to Proceed. Construction on the Project shall begin within ten (10) Working Days of the Notice to Proceed and progress in good faith towards completion without unnecessary delay. The Contractor must work diligently to complete all Punchlist items within twenty (20) Working Days after the Engineer provides the Punchlist.
During the course of construction of the Work, the Agency may require the Contractor to complete portions or phases of the Project, including backfill, compaction, testing, paving and site cleanup, before the Contractor will be allowed to proceed with other portions or phases of the Project. The specific requirements and limits, if necessary for this Contract, are either specified in the Special Provisions, shown on the construction drawings, or shall be determined by the Engineer.
6-3.3 Working Days / Hours.
Add the following new subsection:
6-3.3 Working Days / Hours. Unless otherwise specified, the Contractor’s activities shall be confined to normal working hours between 7:00AM and 5:00PM, Monday through Friday. Lane closures will require flaggers and also be confined to the hours between 8:30AM and 3:30PM, Monday through Friday. If 2-directional lanes remain open, work hours may be extended from 8am-4pm.
No work shall be done on Saturdays, Sundays, or holidays without authorization by the Engineer.
Deviation from these non-Working Days will not be permitted without the prior consent of the Engineer except in emergencies involving immediate hazard to persons or property.
Deviation from these working days and hours will not be permitted without the prior consent of the Engineer except in emergencies involving immediate hazard to persons or property. In the event of either a requested or emergency deviation during non-Working Days / Hours, overtime inspection fees 08/11/2026 C11 230 of 436
119
will be charged against the Contractor. The overtime inspection fees will be calculated at overtime rates and will be deducted from any amounts due the Contractor.
6-4 DELAYS AND EXTENSIONS OF TIME.
6-4.2 Extensions of Time.
Add the following paragraph to this subsection:
Delays to the project caused by labor disputes or strikes involving trades not directly related to the project, or involving trades not affecting the project as a whole shall not warrant an extension of time.
Daily charges for time extensions or delays from other causes shall be limited to negotiated amounts, or if no amounts are agreed upon, shall not exceed those charges documented to Agency’s satisfaction for additional labor and material costs associated with the delay, and an amount not exceeding 10% thereof for overhead and profit.
6-4.4 Written Notice and Report.
Replace the paragraph in this subsection with the following:
6-4.4 Written Notice and Report. If the Contractor desires payment for a delay as specified in Subsection 6-4.3 (“Payment for Delays.”), or an extension of time, it shall file with the Agency a written request and report of cause within ten (10) Working Days after the beginning of the event or occurrence giving rise to the delay. The written notice shall include a statement or estimate of the time extension or compensation being requested, documents supporting the request, including but not limited to evidence of all facts supporting the alleged claim and a current schedule showing the impact of the event or occurrence on the critical path. The request for payment or extension must be made at least fifteen (15) Working Days before the specified completion date. Failure by the Contractor to file these items within the times specified will be considered grounds for refusal by the Agency to consider such request.
By submitting a request for compensation or time extension, the Contractor agrees to make all books and records, including original bid estimates, subcontracts, daily reports, and correspondence, available to the Agency for review. The Contractor also agrees to include this requirement in all subcontracts.
6-6 SUSPENSION OF THE WORK.
6-6.1 General.
Replace this subsection with the following:
6-6.1 General. The Engineer shall have the authority to suspend the Work, wholly or in part, for such period as the Engineer may deem necessary, due to unsuitable weather or to such other conditions (including an act of God or Force Majeure) as are considered unfavorable for the suitable prosecution of the Work, or for such time as the Engineer may deem necessary due to the failure on the part of the Contractor to carry out orders given or to perform any provisions of the Work. The Contractor shall 08/11/2026 C11 231 of 436
120
immediately comply with the written order of the Engineer to suspend the Work wholly or in part and shall not resume the Work until ordered to do so in writing by the Engineer. Such suspension shall be without liability to the Contractor on the part of the City except as otherwise specified in Subsection 6-4.3 (“Payment for Delays.”).
In the event a suspension of work is ordered because of failure on the part of the Contractor to carry out orders given or to perform any provisions of the Work, such suspension of work shall not relieve the Contractor of his responsibility to complete the Work within the time limit set forth herein and shall not be considered cause for extension of the time for completion and, further, such suspension of work shall not entitle the Contractor to any additional compensation.
If the work is suspended or otherwise not continuously prosecuted for any cause whatsoever, within or without the time for completion, the Contractor shall, at his sole cost and expense, remove and replace all or any portion of the work already completed and inspected which Agency, at its sole discretion, could have been damaged during the suspension of work.
6-9 LIQUIDATED DAMAGES.
Replace this subsection with the following:
6-9 LIQUIDATED DAMAGES. Failure of the Contractor to complete the Work within the time allowed will result in damages being sustained by the Agency. For each consecutive working day in excess of the time specified for completion of Work, as adjusted in accordance with Subsection 6-4 (“DELAYS AND EXTENSIONS OF TIME.”), the Contractor shall pay to the Agency, or have withheld from monies due the Contractor, the sum of five hundred dollars ($500.00).
Execution of the Contract shall constitute agreement by the Agency and Contractor that the sum of five hundred dollars ($500.00) per working day is the value of the costs and actual damage caused by the failure of the Contractor to complete the Work within the allotted time. Such sum is liquidated damages and shall not be construed as a penalty, and may be deducted from payments due the Contractor if such delay occurs.
SECTION 7 – MEASUREMENT AND PAYMENT
7-3 PAYMENT.
7-3.1 General.
Add the following paragraph to this subsection:
Except as may otherwise be provided in specific instances, nothing in the Contract shall be construed as vesting in the Contractor any property, any material, article or structure existing at the time of the award of Contract within the area in which the Work is to be done or in any material, article or structure subsequently furnished for the Work by the Agency, or in any material, article, structure or Work furnished or performed by the Contractor after having been accounted for on an approved estimate supporting the Contractor's demand for payment as provided in Subsection 7-3 (“Payment.”) of the Greenbook. In the 08/11/2026 C11 232 of 436
121
latter event any such material, article, structure or Work shall become the property of the Agency after being so accounted for.
7-3.2 Partial and Final Payment
Replace the fifth paragraph of this subsection with the following:
Pursuant to Section 22300 of the California Public Contract Code, the Contractor may substitute securities for any money held by the Agency to ensure performance of the Contract. At the request and expense of the Contractor, securities equivalent to the amount withheld shall be deposited with the Agency, or with a state or federally chartered bank as an escrow agent, who shall return such securities to the Contractor upon satisfactory completion of the Contract. Deposit of securities with an escrow agent shall be subject to written Contract in accordance with the provisions of Section 22300 of the California Public Contract Code. For purposes of the escrow agreement, the Agency shall not certify that the Contract has been completed until at least forty five (45) calendar days after filing by the Agency of a Notice of Completion. Securities eligible for investment under this Section shall be limited to those listed in Section 16430 of the California Government Code, bank or savings and loan certificates of deposit, interest bearing demand deposit accounts, standby letters of credit, or any other security mutually agreed upon by the Contractor and the Agency.
Add the following paragraphs to this subsection:
Requests for partial payments shall be submitted in a form satisfactory to the Agency. At a minimum, the form shall include all bid items, itemized breakdowns of lump sum bid items from the schedule of values (provided by Contractor), unit or lump sum prices bid, the quantities of each bid item for the current and past invoices, the dollar amount of each bid item, a total amount, and the name, address and phone number of the Contractor.
The Contractor shall meet with the Engineer to field measure quantities, and if an agreement is NOT reached, the disputed quantities shall be documented at that time. The Contractor shall not include in his invoice any quantities that have not been approved by the Engineer. The Engineer will not be required to pay for any disputed quantities of work until an agreement is reached with respect to the actual quantity in place. The Engineer may make payments for disputed quantities of work based on his own estimate, until such time that an agreement is reached.
The Agency will make partial payments in accordance with Section 20104.50 of the Public Contract Code, and these specifications. The Agency will pay progress payments within thirty (30) calendar days of receipt of an undisputed, complete and properly prepared payment request from the Contractor, or pay interest to the Contractor equivalent to the legal rate set forth in subdivision (a) of Section 685.010 of the Code of Civil Procedure.
Any payment request determined not to be a proper payment request suitable for payment shall be returned to the Contractor as soon as practicable, but not later than seven (7) calendar days, after receipt.
As part of the monthly request for partial payment, the Contractor shall submit:
08/11/2026 C11 233 of 436
122
1] A list of all subcontractors who worked on the project, along with their PWC Registration Number, so the Agency can ensure that all contractors and subcontractors are registered as required by Labor Code Section 1771.1;
2] Conditional and unconditional lien releases for the Contractor and all subcontractors; 3] An updated construction schedule (showing actual progress of the Work); 4] The Record Drawings (updated to indicate all changes made up to the end of the billing period). 5] Certified payroll records to the Labor Commissioner’s Office;
Monthly progress payments are conditioned upon the Agency having received from the Contractor the monthly schedule update and other specified documents.
Contractor shall provide to City, as a condition precedent to the payment of Contractor’s final retention, a complete list of all subcontractors who have worked on the Project, including their PWC Registration Numbers. This list must be provided at least 30 days prior to the payment of the final retention and shall be submitted under penalty of perjury.
The Agency is required by State Law to withhold final payment to the Contractor until at least 30 days after PWC-100 information has been submitted to the DIR, including the list of subcontractors who worked on the Project.
A prime contractor or subcontractor shall pay any subcontractor not later than ten (10) Working Days of receipt of each progress payment for satisfactory performance in accordance with the provision in Section 7108.5 of the California Business Code concerning prompt payment to subcontractors. The ten (10) Working Days is applicable unless a longer period is agreed to in writing.
Any delay or postponement of payment over thirty (30) calendar days may take place only for good cause and with the Agency’s prior written approval. Any violation of Section 7108.5 shall subject the violating contractor or subcontractor to the penalties, sanction, and other remedies of that section.
The Agency will hold retainage from the prime contractor and will make prompt and regular incremental acceptances of portions, as determined by the Agency of the Contract work, and pay retainage to the prime contractor based on these acceptances. The prime contractor, or subcontractor, shall return all monies withheld in retention from a subcontractor within seven (7) calendar days after receiving payment for work satisfactorily completed and accepted including incremental acceptances of portions of the Contract work by the Agency.
For Federally funded projects, Federal Law (49CFR26.29) requires that any delay or postponement or payment over thirty (30) calendar days of receipt of each payment may take place only for good cause and with the Agency’s prior written approval. These requirements shall not be construed to limit or impair any contractual, administrative, or judicial remedies otherwise available to the prime contractor or subcontractor in the event of a dispute involving late payment or nonpayment by the prime contractor, deficient subcontract performance, and/or noncompliance by a subcontractor. This provision applies to both DBE and non-DBE prime contractors and subcontractors.
For Federally funded projects, Federal Law (49CFR26.29) requires that the prime contractor, or subcontractor, shall return all monies withheld in retention from all subcontractors within thirty (30) calendar days after receiving payment for work satisfactorily completed and accepted including incremental acceptances of portions of the Contract work by the Agency. Any delay or postponement of payment may take place only for good cause and with the Agency’s prior written approval. Any 08/11/2026 C11 234 of 436
123
violation of these provisions shall subject the violating prime contractor or subcontractor to the penalties, sanctions and other remedies specified in Section 7108.5 of the California Business and Professions Code. This requirement shall not be construed to limit or impair any contractual, administrative, or judicial remedies otherwise available to the prime contractor or subcontractor in the event of: a dispute involving late payment or nonpayment by the prime contractor; deficient subcontract performance; and/or noncompliance by a subcontractor. This clause applies to both DBE and non-DBE prime contractors and subcontractors.
7-3.3 Delivered Materials.
Add the following paragraph to this subsection:
Progress payments may include payment for specialty materials that will remain permanent features of the Work, not incorporated in the Work, but delivered and suitably stored at the site or at another location, insured and bonded by the Contractor and agreed to, in writing, by the Engineer.
Payment for stored materials will be based on a cost breakdown, acceptable to the Engineer, indicating the value and installation costs of such materials, provided each individual item has a value of more than five-thousand dollars ($5,000). The Agency will pay a maximum of seventy-five percent (75%) of the value of the material, until such time as the material is permanently installed in the Work. The Contractor shall submit a bill of sale, invoice, or other documentation warranting that the Contractor has received the materials free and clear of liens, charges, security interests, and encumbrances, and evidence that the materials and equipment are covered by appropriate property insurance.
7-3.4 Mobilization.
Delete this subsection in its entirety and replace with the following:
7-3.4 Mobilization and Demobilization. Mobilization and Demobilization shall consist of preparatory work and operations, including, but is not limited to those necessary for the move-on and move-off operations such as:
1] Supplying, maintaining, and finally removing temporary facilities; including portable field office, sanitary facilities, electric power, water, telephone and other utilities, enclosures for storage of construction equipment, products / materials and incidentals;
2] Furnishing all insurance, bonds, licenses, materials, tools, equipment and incidentals involved in mobilization and preparatory work and operations, including, but not limited to, those necessary for the movement of personnel, equipment, supplies, and incidental to the project; for all other facilities, sureties, work and operations which must be performed or costs incurred prior to beginning work or various contractor items on or off the project site;
3] Making arrangements for construction personnel vehicle parking;
4] Application and acquiring permits from other agencies as required for the Project;
5] For other items not directly related to the bid items. 08/11/2026 C11 235 of 436
124
Payment for Mobilization and Demobilization shall be paid by the lump sum price bid as shown on the BID SCHEDULE. If the Mobilization and Demobilization bid item states a maximum percentage of total base bid on the BID SCHEDULE, the Agency reserves the right to conform the bid item price to the maximum stated percentage. When the Agency has to conform the bid item price to the maximum stated percentage, such action does not constitute a reason for the Contractor to withdraw their bid.
If no separate item is shown in the bid for mobilization and demobilization, then the Contractor shall include all costs in the various items of work.
Placement of facilities and storage of construction equipment and materials shall be approved in advance by the Engineer. All such facilities and equipment shall remain the property of the Contractor.
The Contractor shall be held responsible for all damage caused during mobilization and demobilization. The Contractor shall leave all storage areas in a neat clean condition, satisfactory to the Engineer and in accordance with the provisions of storage permits set by the property owner.
When a separate bid item is included in the BID SCHEDULE, payments for mobilization and demobilization will be made in accordance to the following schedule:
a] When the approved monthly partial payment estimate of the amount earned, not including the amount earned for mobilization and demobilization, is ten percent (10%) or more of the original Contract amount, twenty-five percent (25%) of the Contract item price for mobilization and demobilization will be included in the estimate for payment.
b] When the approved monthly partial payment estimate of the amount earned, not including the amount earned for mobilization and demobilization, is twenty- five percent (25%) or more of the original Contract amount, the total amount earned for mobilization and demobilization shall be fifty percent (50%) of the Contract item price for mobilization and demobilization will be included in the estimate for payment.
c] When the approved monthly partial payment estimate of the amount earned, not including the amount earned for mobilization and demobilization, is fifty percent (50%) or more of the original Contract amount, the total amount earned for mobilization and demobilization shall be seventy-five percent (75%) of the Contract item price for mobilization and demobilization will be included in the estimate for payment.
d] When the approved monthly partial payment estimate of the amount earned, not including the amount earned for mobilization and demobilization, is seventy-five percent (75%) or more of the original Contract amount, the total amount earned for mobilization and demobilization shall be ninety-five percent (95%) of the Contract item price for mobilization and demobilization will be included in the estimate for payment.
e] After final acceptance of the Project, the remaining unpaid amount, of the Contract item price for mobilization will be included for payment in the final progress payment.
7-3.7 Agreed Prices.
Add the following to this subsection:
08/11/2026 C11 236 of 436
125
Agreed prices shall be negotiated before commencement of the Work.
7-4 PAYMENT FOR EXTRA WORK.
7-4.1 General.
Replace the first sentence in this subsection with the following:
When the cost and time for Extra Work cannot be agreed upon prior to the commencement of the Work, the Agency will pay for Extra Work based on the accumulation of costs as provided herein and grant additional time to the Contract duration. Extra Work shall be paid for under a written Change Order, approved by the Agency, in accordance with the terms therein provided. Generally, payment for Extra Work will be made at the unit price or lump sum previously agreed upon between the Contractor and the Agency.
7-4.2.3 Tools and Equipment Rental.
Replace the second paragraph in this subsection with the following:
Regardless of ownership, the rates to be used in determining equipment rental costs shall not exceed most current listed rates found in the Caltrans Labor Surcharge and Equipment Rental Rates, which is available online at:
https://dot.ca.gov/programs/construction/equipment-rental-rates-and-labor-surcharge
Add the following paragraphs to this subsection:
Where the Contractor can substantiate that the rental rates prevailing locally exceed the published rate by more than fifteen percent (15%), the Contractor will be entitled to a rental rate adjustment.
For equipment not listed in said publication, rental rates must not exceed listed rates prevailing locally at equipment rental agencies or distributors, at the time the Work is performed.
Whenever possible, Extra work must be accomplished using equipment available on Site or owned by the Contractor. If a specific piece of equipment must be rented to be used exclusively for the Extra Work, the rental rate will be the invoiced rate.
7-4.3 Markup.
7-4.3.1 Work by Contractor.
Replace the paragraph in this subsection with the following:
7-4.3.1 Work by Contractor: The following allowable overhead and profit percentages shown in Table 7-4.3.1 below shall be added to the Contractor’s costs and shall constitute the markup for all overhead, insurance, and profits on work performed by the Contractor:
08/11/2026 C11 237 of 436
126
Table 7-4.3.1
COMPONENT OVERHEAD PROFIT
Labor 10% 10%
Materials 10% 5%
Equipment Rental 10% 5%
Other Items and Expenditures 10% 5%
Regardless of the number of hierarchical tiers of Subcontractors, the five percent (5%) which is the Contractor’s allowance 3.5% (for overhead) and 1.5% (for profit) may be applied one time only to the performing Subcontractor’s total cost.
One percent (1%) shall be added to the sum of the costs and markups provided for in the subsection as compensation for bonding.
7-4.3.2 Work by Subcontractor.
Replace the paragraph in this subsection with the following:
7-4.3.2 Work by Subcontractor: When all or any part of the Extra Work is performed by a Subcontractor, the markup established in 7-4.3.1 shall be applied to the Subcontractor’s actual cost of such work. A markup of ten percent (10%) on the first Five-Thousand Dollars ($5,000) of the subcontracted portion of the Extra Work and a markup of five percent (5%) on work added in excess of Five-Thousand dollars ($5,000) of the subcontracted portion of the Extra Work may be added by the Contractor.
The markups specified in Subsections 7-4.3.1 (“Work by Contractor.”) and 7-4.3.2 (“Work by Subcontractor.”) shall be considered as full compensation and include, but not be limited to, the Contractor’s labor costs for personnel not working directly on the Extra Work, including the cost of administration and any tools or equipment that they may use. Such costs shall not be reported as labor or equipment costs elsewhere except when they are actually used in the performance of the Extra Work. Labor costs shall in that case be reported for the labor classification corresponding to the type and nature of Extra Work performed.
7-4.4 Daily Reports.
Add the following as the first sentence in this subsection:
The Contractor shall notify the Engineer at the beginning of each working day when Extra Work is in progress.
7-6 BID ITEMS.
Add the following new subsection:
08/11/2026 C11 238 of 436
127
7-6 BID ITEMS. Payment for the work included in each Bid Item shall be made at the actual quantity constructed, using the units listed in the BID SCHEDULE and the Unit Prices included in the BID. All other work shown or mentioned on the Plans, in the Specifications, or in any one of the Contract Documents shall be considered as included in the related Bid Items shown in the BID SCHEDULE. The Contractor must complete all work that is shown or described in the Contract Documents, whether or not there is a specific Bid Item for that work, and no additional compensation will be allowed.
For the North Indiana Avenue Sidewalk Improvement Project, the Bid Items in the BID SCHEDULE are summarized for the General items applicable to the entire project and for the three main types of Street Rehabilitation and Resurfacing projects as shown on the Plans. A breakdown of the Bid Item quantities by Project Location, as described on the Plans, is included in the appendices (see list of Appendices in Table of Contents on Page 2) to these Specifications.
08/11/2026 C11 239 of 436
128
SUPPLEMENTARY TECHNICAL PROVISIONS
NORTH INDIANA AVENUE SIDEWALK IMPROVEMENTS (C.I.P. No. 8402B)
This section makes additions, deletions, or revisions to PART 2 – CONSTRUCTION MATERIALS, PART 3 – CONSTRUCTION METHODS, PART 4 – EXISTING IMPROVEMENTS, PART 5 – PIPELINE SYSTEM REHABILITATION, PART 6 – TEMPORARY TRAFFIC CONTROL, PART 7 – STREET LIGHTING AND TRAFFIC SIGNAL SYSTEMS, AND PART 8 – LANDSCAPING AND IRRIGATION of the 2024 Standard Specifications for Public Works Construction (“Greenbook”). As a convenience, these additions and amendments have been arranged in a format that parallels the Greenbook. All sections and subsections which are not changed remain in full force and effect. Additional Special Provision sections and subsections may be included in these supplements which may be written in a format different from that of the Standard Specifications. These additional Special Provision sections and subsections are intended to complement the Standard Specifications.
PART 2 - CONSTRUCTION MATERIALS
SECTION 200 – ROCK MATERIALS
200-1 ROCK PRODUCTS.
200-1.1 General.
Add the following paragraph to this subsection:
In accordance with the provisions of Section 20676 of the State of California Public Contract Code, it shall be mandatory upon the Contractor to whom the Contract is awarded, and upon all subcontractors and suppliers under him, to obtain all construction aggregate, sand, gravel, crushed stone, road base, fill materials, and any other mineral materials, including those used in other construction materials such as asphalt concrete and Portland Cement concrete, from a supplier that is included on the most current Office of Mine Reclamation AB 3098 List (per California Assembly Bill 3098). Failure to identify the supplier and the mine may result in rejection of the submittal, and any work completed using materials from an unlisted mine will be SUBJECT TO REJECTION.
200-2 UNTREATED BASE MATERIALS.
200-2.1 General.
Add the following paragraph to this subsection:
Aggregate base shall be Class 2 per Subsection 26-1.02B, “Class 2 Aggregate Base” of the Caltrans Standard Specifications, and associated AGGREGATE GRADING REQUIREMENTS and QUALITY REQUIREMENTS tables or Crushed Aggregate Base per Subsection 200-2.2 (“Crushed Aggregate Base.”) and as shown in the gradation in TABLE 200-2.2.2 of Subsection 200-2.2.2 (“Grading.”) of the Greenbook.
Aggregate may include up to one hundred percent (100%) material processed from reclaimed asphalt concrete, Portland Cement concrete, lean concrete base, cement treated base or a 08/11/2026 C11 240 of 436
129
combination of any of these materials. It should be noted, this does not change the specification requirements for material or placement quality. It is still the Contractor’s responsibility to verify that any blend of reclaimed paving materials with or without virgin materials shall meet all the specification requirements.
SECTION 201 – CONCRETE, MORTAR, AND RELATED MATERIALS
201-1 PORTLAND CEMENT CONCRETE.
201-1.1 General.
Add the following paragraph to this subsection after the first paragraph:
Contractor shall furnish the Engineer a copy of the mix design to be used and with legible certified weight-master’s certificate for each load of PCC delivered to the Work. Portland Cement concrete delivered to the project site having a water content and/or slump greater than that specified in the mix design shall be rejected and removed from the Work site.
201-1.2.6.3 Accelerating Admixtures
Modify this subsection to read as follows:
Calcium Chloride shall not be used as an admixture. Other accelerating admixtures shall conform to ASTM C 494, accelerating (Type C), or water-reducing and accelerating (Type E) admixtures, shall be approved by the Engineer prior to use.
201-1.3.3 Concrete Specified by Class and Alternate Class.
Modify the third paragraph of the subsection to read as follows:
The concrete class, alternate class, and maximum slump for various types of construction shall be as specified in Table 201-1.3.3 except for the concrete class specified for Street Surface Improvements. Street Surface Improvements shall have a concrete class of 560-C-3250.
201-1.5.4 Hand Mixing.
Replace the first sentence in this subsection with the following:
Hand mixing concrete shall not be allowed except by prior permission from the Engineer and, if permitted, only when the amount of concrete required is less than one cubic yard (1 yd.3).
Prepackaged unmixed concrete shall not be allowed except by prior permission from the Engineer.
201-2 REINFORCEMENT FOR CONCRETE.
201-2.2 Steel Reinforcement.
201-2.2.1 Reinforcing Steel.
08/11/2026 C11 241 of 436
130
Replace the first sentence in this subsection with the following:
Unless otherwise specified, reinforcing steel, except longitudinal steel, shall be Grade 60 billet steel conforming to ASTM A615.
201-3 EXPANSION JOINT FILLER AND JOINT SEALANTS.
201-3.1 General.
Replace the second paragraph of this subsection with the following:
All expansion joints shall be formed with joint filler and sealed with Type “A” two-part polyurethane sealant per Subsection 201-3.4 (“Type “A” Sealant (Two-Part Polyurethane Sealant”). The filler shall be placed in the correct position before concrete is placed against it. Holes or joints in the joint filler shall be filled with joint sealant to prevent the passage of mortar or concrete from one side of the joint to the other.
SECTION 203 – BITUMINOUS MATERIALS
203-5 RUBBERIZED EMULSION-AGGREGATE SLURRY (REAS).
203-5.1 General.
Add the following paragraph to this subsection:
Type 1 slurry seal shall be used on residential streets and Type 2 slurry seal shall be used on residential collector streets.
203-6 ASPHALT CONCRETE.
203-6.1 General.
Add the following paragraphs to this subsection:
The grading of the combined aggregates and the percentages of asphalt binder shall be as follows:
Class and Grade
Three-quarter inch (3/4”) Base Course B-PG 64-10 RAP
One-half inch (1/2”) Surface Course C2-PG 64-10 RAP
A minimum of five (5) Working Days prior to the paving operation, the Contractor shall submit to the Engineer the pavement supplier’s certification of gradation and oil content of the asphalt concrete to be used for this Contract.
08/11/2026 C11 242 of 436
131
SECTION 207 – GRAVITY PIPE
207-2 REINFORCED CONCRETE PIPE (RCP).
207-2.9 Basis for Acceptance.
207-2.9.1 General.
Delete this subsection in its entirety and replace with the following:
207-9.1 General. The basis for acceptance shall be by the D-load bearing strength test, compliance with these specifications, inspections of the pipe manufacture and inspection of the completed pipe.
209-7 PIPELINE IDENTIFICATION.
209-7.2 Requirements.
Add the following to this subsection:
Detectable Underground Utility Marking Tape shall have a minimum 0.005” overall thickness, with no less than a 35 gauge (AWG) aluminum foil core. The foil must be visible from both sides. The layers shall be laminated together with the extrusion lamination process, not adhesives. No inks or printing shall extend to the edges of the tape. All printing shall be encased to avoid ink rub-off. Detectable Underground Utility Marking Tape shall conform to the properties listed in TABLES 209-7.2 (A) and 209-7.2 (B) below.
TABLE 209-7.2 (A)
DETECTABLE UNDERGROUND UTILITY MARKING TAPE PROPERTIES
PROPERTY METHOD VALUE
Thickness ASTM D2103 0.0056”
Tensile strength ASTM D882 25 lbs/inch (5,500 psi)
Elongation ASTM D882-88 50 dynes/cm2
Flexibility ASTM D671-81 Pliable hand
Inks Manufacturing specifications Heat-set Mylex
Message repeat Manufacturing specifications Every 20”
Foil Manufacturing specifications Dead soft/annealed
Top layer Manufacturing specifications Virgin PET
Bottom layer Manufacturing specifications Virgin LDPE
Adhesives Manufacturing specifications >30%, solid 1.5#/R Bond strength Boiling H2O at 100 degrees Celsius Five (5) hours without peel Colors APWA Code See Table 209-7.2 (B) below
TABLE 209-7.2 (B)
DETECTABLE UNDERGROUND UTILITY MARKING TAPE COLORS
08/11/2026 C11 243 of 436
132
COLOR UTILITY MARKED
Red Electric power, distribution, transmission, and municipal electric systems.
Yellow Gas and oil distribution and transmission, dangerous materials, product and steam.
Orange Telephone and telegraph systems, police and fire communications, and cable television.
Blue Water systems.
Green Sanitary and storm sewer systems, nonpotable.
209-7.3 Material Approvals.
Add the following new subsection:
209-7.3 Material Approvals. Detectable Underground Utility Marking Tape shall meet the requirements of each of the following agency / association publications:
(1) Department of Transportation, Materials Transportation Bureau, Office of Pipeline Safety.
USAS code for pressure piping B31.8, paragraph 192.321(e).
(2) National Transportation Safety Board, Washington, DC, Special Study Prevention of Damage to Pipelines. Adopted June 7, 1974. Report NTSB-PSS-73-1.
(3) American Petroleum Institute (API). Recommended practice for marking buried liquid petroleum pipelines - APR RP 1109.
(4) General Services Administration, Washington, DC, Public Buildings Service Guide Specification for Mechanical and Electrical Equipment - PBS 4-1501, Amendment 2, Page 501-14, Paragraph 18, Subparagraph 18.1, Clause 18.1.1.
(5) Rural Electrification Authority (REA), U.S. Department of Agriculture, Washington, DC, National Electrical Safety Code for Underground Construction for remote and immediate hazards.
SECTION 213 – ENGINEERING GEOSYNTHETICS
213-5 GEOTEXTILES AND GEOGRIDS.
Revise this subsection to read as follows:
213-5 GEOTEXTILES AND GEOGRIDS. Geosynthetic material used for reinforcing the subgrade or aggregate base, if necessary as determined by the Geotechnical Engineer or the City Engineer, shall be Geogrid BX1100.
08/11/2026 C11 244 of 436
133
Add the following new Section:
SECTION 220 – MISCELLANEOUS
220-1 RESIDENTIAL MAILBOX.
220-1.1 General.
220-1.1 General. Mailboxes shall be of standard size (typically 8.75”H x 6.75”W x 19.0”D), made of solid aluminum, painted white by the manufacturer, and shall be approved by the United States Post Office. The mailbox shall be mounted on a pressure treated post and platform as shown on the City of Vista Standard Drawing SRF-04 consisting of a four-inch by four-inch (4”x 4”) pressure treated post (primed and painted with white solid body satin), one and one-half inches (1-1/2”) thick redwood or pressure treated platform (6.75”W x 19”D), and four galvanized lag bolts.
Prior to purchasing the new mailboxes the CONTRACTOR shall submit shop drawings to the ENGINEER for approval showing the manufacturers catalog sheets and including all mounting and installation details.
PART 3 - CONSTRUCTION METHODS
SECTION 300 – EARTHWORK
300-1 CLEARING AND GRUBBING.
300-1.1 General.
Add the following paragraphs to this subsection:
Clearing and Grubbing shall include the protection of all items to remain, sawcutting, cold milling AC pavement, demolition of existing improvements, salvaging existing materials (topsoil) and improvements as specified or shown on the Plans, removal of deleterious materials, and proper disposal from the Project site of all existing surface and subsurface materials as required to construct the improvement as shown on the Plans and as described in the Specifications. Typical items to be removed include, but are not limited to, trash, fences, posts, poles, gates, street signs, AC dikes, AC paving, striping (by grinding), decorative concrete, concrete driveway entrance, concrete sidewalk, concrete curb and gutter, concrete headwall structures, retaining walls, landscape border logs, decorative walls, concrete pavers, reinforcing steel, rock, boulders and cobbles, trees, stumps and roots, shrubs, other vegetation or organic materials, soil, irrigation systems, spoils, debris, sewer pipe, storm drain pipe, storm drain inlets and grates, electrical conduits and pullboxes, wire, utility cabinets or boxes, drinking fountains, guardrails, delineators, pavement markers, and all other objectionable materials which interfere with the Work whether or not specifically indicated on the Plans or otherwise shown to be protected or relocated. Abandoned utility lines and structures not removed with Engineer’s approval shall be filled with blown sand and conduits plugged. Concrete and bituminous 08/11/2026 C11 245 of 436
134
pavement shall be removed to neatly sawed edges. Sawcuts shall be to a minimum depth of three inches (3”).
Clearing and grubbing shall also include the relocation, adjusting or salvaging of all facilities so indicated on the Plans which are not designated as separate bid items or which are not included in other bid items.
If there are decorative items on private lots, including decorative concrete pavers, decorative wall blocks, rocks used for landscape decoration, boulders, and custom signs, and the Contractor would prefer to salvage items for the property owners, the items shall be removed carefully and placed at a location near the disturbed area on the private property, with the property owner’s approval.
The Contractor shall remove existing irrigation systems (including both water supply and water distribution lines, electrical supply, and electrical control elements of the system) that are within the Project limits and place these materials on the property owner’s property. Contractor shall cap ends of cut lines and wires, and mark locations with lath so that property owner can locate them later.
Miscellaneous fencing materials may be encountered during Work. The terminal post of each fence removed shall be reinforced by bracing or other appropriate means to maintain the structural integrity of the portion of fence to remain. Relocation and reconnection of existing fences as shown on the Plans shall include all posts, hardware, and all incidentals necessary to complete the Work.
Terminations for all fire hydrants, WARF type services and associated piping to be removed and salvaged shall be in accordance with the Vista Irrigation District (VID) standards. The minimum requirements shall include removal of piping back to the mainline, closing the valve, and installation of a blind flange and thrust block.
All existing water services shall be relocated or extended to behind curb or behind sidewalk if contiguous to curb. The Contractor shall inspect and verify that the existing service, including the connection at the main, meets current Vista Irrigation District (VID) standards. Where existing services meet VID standards, extension of the service will be allowed at the price bid for water meter relocations.
All existing sewer or water facilities to be abandoned within the proposed Project limits shall be terminated at the mainline in accordance with district requirements. This shall include removal of the sewer and water service back to the main. The sewer lateral shall be capped with a fitting and sealed with concrete at the wye connection. The water service shall be terminated at the corporation stop and the stop closed.
During surface clearing operations, the Contractor shall not cover or bury any plant growth or other objectionable materials on public or private property. If the Contractor cannot successfully separate the plant growth from the surface soil and advertently or inadvertently mixes organic or other objectionable materials with the soil, the soil so contaminated shall be removed from the site by the Contractor. All costs, if any, associated with removing the soil mixed with organic or other objectionable materials and importing soil to replace said contaminated soil shall be borne by the Contractor and no additional payment shall be made to the Contractor.
During grading operations, the Contractor shall provide temporary graded driveways and continuing maintenance thereof to provide safe, smooth, stable and continuous access to all 08/11/2026 C11 246 of 436
135
residences and businesses within the Project area. All costs, if any, associated with such grading operations shall be borne by the Contractor and no additional payment shall be made to the Contractor.
Unless otherwise noted on Plans, the Contractor shall protect all existing sewer, water, electric, telephone, communication, television, fire lines, street lights, traffic signal, red light cameras, irrigation, and other utilities, services and systems, whether shown on the Plans or not. The Contractor shall maintain all services in working condition during the course of the Work. The Contractor shall remove all existing abandoned pipelines and conduits of any type or use, and pipelines and conduits of any type or use that are abandoned during the course of the Work and shall replace said pipelines and conduits with properly compacted soils. The Contractor shall immediately restore to full operation any utilities, services or systems that are disturbed during the course of the Work.
300-1.4 Payment.
Modify this subsection to read as follows:
300-1.4 Payment. The BID SCHEDULE DOES NOT include a bid item for Clearing and Grubbing.
Full compensation for any necessary Clearing and Grubbing required to perform the construction operations specified or shown on the Plans will be considered as included in the price bid for the related items of work, and no additional compensation will be allowed therefore. Payment for removal and disposal of abandoned utilities shall be included in the various items of work and no additional compensation will be allowed therefore.
300-2 UNCLASSIFIED EXCAVATION.
300-2.1 General.
Modify this subsection to read as follows:
300-2.1 General. Unclassified excavation shall consist of all excavation, including roadway excavation, removal and stockpiling of suitable material, mixing and moisture conditioning of dry material, mixing and drying of wet material by various methods, disposal of unsuitable materials (including cobbles, rocks and boulders), salvage and stockpile of existing topsoil for use on the Project, and all other required earthwork operations to bring all areas that are within the grading and excavation limits on both public and private property to the required subgrade elevations and cross sections as shown on the Plans and as required in the Project’s geotechnical investigation. Suitable excavated material may be used onsite to make all fills shown on the Plans. Unclassified excavation shall also include pumping and disposal of storm water and groundwater. Any tree roots or other deleterious material uncovered during excavation shall be completely removed and cut back so that new improvements will not be affected by future root growth.
In the event weather conditions make drying by aeration or other processes impractical as determined by the engineer, he may suspend the Work. However, the Contractor shall continuously provide for traffic and access requirements during the suspension period in conformance with these Technical Provisions. The Work shall be suspended as provided for in Section 6 (“PROSECUTION, 08/11/2026 C11 247 of 436
136
PROGRESS, AND ACCEPTANCE OF THE WORK.”) of the Standard Specifications except the suspension shall not be deemed to be suspension by the Agency for its own convenience or benefit.
Stockpiling of material and storage of equipment or supplies associated with excavation and/or soil aeration activities within existing or proposed wetland, willow woodland or riparian areas is strictly prohibited.
The excavation, placement, conditioning, and compaction of material shall be in accordance with the Plans, Specifications, the City of Vista Development Code (Chapter 17 Section 17.56), to the discretion of the City Engineer.
300-2.2 Unsuitable Material.
300-2.2.1 General.
Modify this subsection to read as follows:
300-2.2.1 General. All excess material generated by the grading operations that is not suitable for backfill shall be excavated and disposed of by the Contractor at a legal disposal site. The Agency makes no claim on the suitability or moisture content of the existing materials. Any suitable local borrow materials at the site that the Contractor wishes to re-use shall be stockpiled by the Contractor.
The location of stockpiles shall be approved by the Engineer prior to placement of materials, and all stockpiles shall be protected by erosion control measures.
All subgrade areas to receive fills or structures shall be inspected by the Geotechnical Engineer.
All alluvial and colluvial soils, loose or poorly compacted soils, or existing dry material must be reworked before the placement of base or concrete can proceed. Areas where soils are loose or poorly compacted shall be reworked by excavating, blending and recompacting the loose soils to the specified compaction. The existing loose soils to be reworked shall be removed by the Contractor until a firm unyielding surface is exposed or to a depth determined by the Engineer. Dry materials shall be scarified and moisture conditioned to achieve the specified compaction. With the approval of the Geotechnical Engineer, the Contractor may choose to stabilize poorly-compacted areas with geogrid at his own expense.
If the Contractor wishes to temporarily stockpile material for disposal at a later date in any area other than the project area or construction staging area, the Contractor shall locate a suitable space which is outside the Public Right-of-Way and suitable to the Agency. The location of stockpiles shall be approved by the Engineer prior to placement of materials, and all stockpiles shall be protected by storm water pollution prevention and erosion control measures. The stockpiles shall be removed regularly from the Project site so as not to interfere with access to the Project.
If the excavated material is unsatisfactory as excavated for other uses in the Project, as determined by the Engineer, the Contractor shall remove and dispose of such excavated material off the site. The Contractor shall be responsible for obtaining a suitable legal disposal site for any unsuitable excavated materials in accordance with the appropriate section in the Standard Specifications.
08/11/2026 C11 248 of 436
137
300-2.2.2 Wet Material.
Modify this subsection to read as follows:
300-2.2.2 Wet Material. If required excavated material is unsatisfactory for the specified use on the Project solely because the material has a moisture content of four percent (4%) or more above the optimum moisture content, the Contractor shall process the material to reduce the moisture content to an optimum condition, or remove the material and replace it with suitable material. The material may be processed by blending the wet soil with soils having a lower moisture content and / or spreading the excavated material in a manner that enables the material to dry to optimum moisture content. With the approval of the Geotechnical Engineer, the Contractor may choose to stabilize unstable subgrade areas with geogrid at his own expense.
300-2.7 Selected Material.
Modify this subsection to read as follows:
300-2.7 Selected Material. Selected material encountered in excavation within the right-of-way shall be used as directed by the Engineer. Topsoil excavated within the limits of the Project may be considered as a selected material only for the purpose of backfilling areas to be planted.
300-2.8 Measurement.
Add the following paragraph to this subsection:
The Plans and the Specifications show work to be done which requires earthwork, both cut and fill, to establish the lines and grades shown on the Plans. The Agency has endeavored to establish reasonable accurate earthwork quantities of the work actually involved and these quantities represent the results of actual survey measurements and data and calculated adjustments for changes proposed on the Plans, however, due to the approximate nature of such data and therefore the difficulty of making accurate measurements of earthwork quantities for this type of project, the estimated quantities for grading will be assumed to be the actual quantity. The Contractor shall review the site and make his own estimate of the Work required to complete the Project. No modifications shall be made to the quantity shown on the Plans and in the Specifications, unless additional quantities of grading are ordered by the Engineer.
300-2.9 Payment.
Modify this subsection to read as follows:
300-2.9 Payment. The BID SCHEDULE for this Project DOES include a bid item for Unclassified Excavation. Full compensation for all necessary Unclassified Excavation required to perform the construction operations specified or shown on the Plans will be considered as included in the price bid for Unclassified Excavation, and no additional compensation will be allowed therefore.
08/11/2026 C11 249 of 436
138
The excavation, stockpiling, and placement of topsoil and suitable local borrow material will be included in Unclassified Excavation. Removing such material from the stockpile and placing it in its final position is also included in Unclassified Excavation. The Contractor may stockpile suitable local borrow material or import suitable borrow material; however, no separate payment will be made for excavating material from an optional stockpile or importing suitable borrow material and placing the material in its final position.
The removal and disposal of unsuitable material, and the over-excavating and reworking of material that can be made suitable, including groundwater removal by various drying procedures or other remedial geotechnical (soil) treatment shall be included in Unclassified Excavation and no additional compensation will be allowed.
The over-excavation and processing or removal and disposal of wet materials shall be included in Unclassified Excavation and no additional compensation will be allowed.
No separate payment will be made for excavating topsoil temporarily stockpiled and placing in its final location on the slope and other areas to be planted for erosion control planting or landscaping, whether or not required by the Contract Documents or by the Engineer.
300-3 STRUCTURE EXCAVATION AND BACKFILL.
300-3.1 General.
Add the following paragraphs to this subsection:
In accordance with the provisions of Section 20676 of the State of California Public Contract Code, it shall be mandatory upon the Contractor to whom the Contract is awarded, and upon all subcontractors and suppliers under him, to obtain all construction aggregate, sand, gravel, crushed stone, road base, fill materials, and any other mineral materials used for Structure Backfill, from a supplier that is included on the most current Office of Mine Reclamation AB 3098 List (per California Assembly Bill 3098). Failure to identify the supplier and the mine may result in rejection of the submittal, and any work completed using materials from an unlisted mine will be SUBJECT TO REJECTION.
The excavation, placement, conditioning, and compaction of material shall be in accordance with the Plans, Specifications, the City of Vista Development Code (Chapter 17 Section 17.56).
The Contractor shall excavate to the lines and grades required, whether or not specifically shown on the Plans. The Contractor shall provide and remove all shoring, sheeting, bracing, cribbing, pumping, lagging, piling, tiebacks, soil anchors, shields, temporary retaining structures, planking, or other types of support for the walls of all open excavations required. The Contractor shall excavate and maintain the bottom of all trenches and excavations in a condition that is level, firm, clean and free from all debris or foreign matter. Excavations shall be kept free from water at all times. The Contractor shall remove any unsuitable material encountered below grade as directed by the Engineer.
300-3.7 Payment.
Add the following paragraphs to this subsection:
08/11/2026 C11 250 of 436
139
Compensation for dewatering shall be considered as included in the lump sum price bid paid for Dewatering Measures or included as an incidental item to Unclassified excavation or other items of work in the BID SCHEDULE and no additional compensation will be allowed therefore. Full compensation for any necessary work related to Unsuitable Materials required to perform the construction operations specified or shown on the Plans will be considered as included in the price bid for the related items of work, and no additional compensation will be allowed therefore.
Full compensation for supporting the excavation for structures shall include furnishing all labor, materials, tools, equipment, and incidentals and for doing all the work involved in providing excavation safety, shoring or sloping of excavations including, but not limited to, design of the shoring system; obtaining all necessary permits from the Division of Occupational Safety and Health; constructing shoring; and removal and disposal of the shoring materials; all as shown on the Plans, or as specified in the General Conditions, Standard Specifications, and these Supplementary Special Provisions; shall be considered as included in the related items of work and no additional compensation will be allowed.
No change will be made in the amount to be paid for supporting the excavation for structures as a result of required revisions in the excavation support details due to a type of soil encountered which requires a method of trench support different from that approved.
300-4 UNCLASSIFIED FILL.
300-4.1 General.
Add the following paragraphs to this subsection:
The excavation, placement, conditioning, and compaction of material shall be in accordance with the Plans, Specifications, the City of Vista Development Code (Chapter 17 Section 17.56).
Any objectionable material, including organic and inorganic debris, shall be removed, and shall not be placed in the fill.
The Contractor shall establish rough grade of the areas to be planted by placing fill material to a minimum of six inches (6”) below the finished grade shown on the Plans. The Contractor shall then complete the grading work to establish finished grade by placing a minimum of six inches (6”) of topsoil that has been stockpiled from the existing site or imported.
Excess soil remaining from excavations on the Project site may only be used for fill material when rocks, lumps, cobbles, clods, base material, or other solid materials such as broken concrete or asphalt from removal operations are suitable for the particular area to be filled as determined by the Engineer and conform to the requirements of the geotechnical investigation. Broken concrete or asphalt pavement materials shall not be allowed within site grading fill areas or roadway fills less than three feet (3’) in height, within three feet (3’) of final grade in any area or within five feet (5’) (vertically) of the existing ground water table. Any concrete or asphalt placement shall be approved by the Geotechnical Engineer.
Concrete or asphalt pieces shall be less than six inches (6”) in maximum dimension and surrounded by soil particles when used as compacted fill. No nesting shall occur. If the Contractor wishes to use any of the excess material remaining from the Project excavations for any purpose, the material must be suitable for use as fill or backfill and meet the requirements of Subsection 300-4 (“UNCLASSIFIED FILL.”) of the Standard Specifications and the geotechnical investigation for this Project. The 08/11/2026 C11 251 of 436
140
Contractor shall first remove all organic material, construction debris, miscellaneous debris, rubbish, and other objectionable materials contained therein, then obtain tests of the material from the project’s Geotechnical Engineering Laboratory to confirm its suitability for placement. Material shall be tested and approved by the Engineer prior to placement.
Geotechnical (soil) testing of all fill materials; subgrade, subbase, and base will be conducted by the Agency and the Geotechnical Engineer. Geotechnical (soil) tests may include relative compaction tests, sand equivalent tests, sieve analysis, R-values, etc. The results shall be presented directly by the laboratory to the Engineer. No base or PCC pavement shall be placed prior to the subgrade or subbase being compacted, tested and approved by the Engineer.
The cost of any initial geotechnical (soil) tests shall be borne by the Agency. Additional geotechnical (soil) tests due to the failure of one (1) or more of the initial tests shall be conducted by the laboratory and any costs borne by the Contractor. The Contractor shall make allowances in his construction procedure to permit testing of the Work in progress by the Engineer, and no additional compensation shall be paid to the Contractor for delays due to testing.
300-4.10 Payment.
Modify this subsection to read as follows:
300-4.10 Payment. The BID SCHEDULE for this Project DOES NOT list a bid item for Unclassified Fill. Full compensation for any necessary Unclassified Fill required to perform the construction operations specified or shown on the Plans will be considered as included in the price bid for the related items of work, and no additional compensation will be allowed therefore.
300-5 BORROW EXCAVATION.
300-5.2 Imported Borrow.
Add the following paragraph to this subsection:
In accordance with the provisions of Section 20676 of the State of California Public Contract Code, it shall be mandatory upon the Contractor to whom the Contract is awarded, and upon all subcontractors and suppliers under him, to obtain all construction aggregate, sand, gravel, crushed stone, road base, fill materials, and any other mineral materials used for Imported Borrow, from a supplier that is included on the most current Office of Mine Reclamation AB 3098 List (as proposed in California Assembly Bill 3098 and now codified in Section 2717.(b) of the State of California Public Resources Code). Failure to identify the supplier and the mine may result in rejection of the submittal, and any work completed using materials from an unlisted mine will be SUBJECT TO REJECTION.
300-5.4 Measurement and Payment.
Modify this subsection to read as follows:
08/11/2026 C11 252 of 436
141
300-5.4 Measurement and Payment. The BID SCHEDULE for this Project DOES NOT list a bid item for borrow excavation. Full compensation for any necessary borrow required to perform the construction operations specified shall be considered as included in the related items of work for which the borrow excavation is required, and no additional compensation will be allowed therefore.
300-12 EROSION CONTROL.
300-12.1 General.
Add the following new subsection:
300-12.1 General. The Contractor shall provide erosion control and water pollution control conforming to the requirements shown on the Plans, as specified herein, and as elsewhere required by the Contract Documents. Erosion control and water pollution control shall include the Work specified herein, and such additional measures, as may be directed by the Engineer, to meet Best Management Practices, as defined herein, and to properly control erosion and storm water damage of the limits of work and construction impacts upon areas receiving drainage flows from within the limits of work.
The work covers the prevention, control and abatement of waterborne silts, sediments, earth materials, inorganics, chemicals, construction materials, trash, and debris in order that pollution of the existing onsite and downstream watercourses is prevented or minimized. The Work includes preventing, controlling or abating water polluting elements or materials which may result both directly and indirectly from within and outside the Project work limits. This includes water flow from, to, or through the site resulting from rainfall runoff, groundwater movement, and stream storm water discharge.
The work includes:
a] the exercise of care and the execution of every reasonable precaution by the Contractor as required by the conditions of the site, weather and construction activities involved;
b] the implementation of construction of various devices, facilities, or features shown on the Plans;
c] the implementation or construction of any devices, facilities, or programs as required conditions of any regulatory agency permits for the Project. The Work therefore includes, but is not limited to, the construction and / or installation of temporary devices such as hay (straw) bales; silt fences; gravel bags; erosion control netting, fabric, blankets, or mats; silt or sediment basins; dikes or berms; swales, linings; ponds; diversion structures, pipes, and related facilities.
d] the cleaning, repairing, silt and sediment removal, maintenance and the removal of devices.
Note: The Contractor’s attention is also directed to the specific requirements contained within the regulatory agency conditional agreements.
Unless other more restrictive requirements are specified elsewhere in the General Conditions or these Special Provisions, or as a requirement of regulatory or other Agency permits, the following minimum provisions shall be met:
a] Equipment and workers for emergency work shall be made available at all times during the rainy season. All necessary materials shall be stockpiled on site at convenient locations to facilitate rapid construction or deployment of temporary devices when rain is imminent. 08/11/2026 C11 253 of 436
142
b] Devices shown on the Plans shall not be moved or modified without the approval of the Engineer.
c] The Contractor shall restore all erosion control devices to working order to the satisfaction of the Engineer after each runoff-producing rainfall, and every 24 hours during a prolonged storm event, as needed.
d] The Contractor shall install additional erosion control measures as may be required by the Engineer due to uncompleted grading operations or unforeseen circumstances which may arise.
e] The Contractor shall be responsible and shall take necessary precautions to prevent public trespass onto areas when impounded waters create a hazardous condition.
f] During the rainy season and when rainfall is probable, graded areas around the Project perimeter must drain away from the face of slope at the conclusion of each working day.
g] All removable protective devices shown shall be in place at the end of each working day when the five (5) calendar day rain probability forecast exceeds thirty percent (30%).
Compliance with the requirements of this subsection shall in no way relieve the Contractor from his responsibility to comply with the other provisions of the contract, in particular his responsibility for damage and for preservation or property.
Failure to take said measures satisfactory to the Engineer or regulatory agencies will subject Contractor to orders to cease operations. Any losses to Contractor associated therewith shall be at Contractor’s sole expense.
300-12.2 Grading Controls.
Add the following new subsection:
300-12.2 Grading Controls. The Contractor shall protect all areas that have been graded and/or cleared and grubbed as well as areas that have not been graded and/or cleared and grubbed within the limits of work from erosion. The Contractor shall provide temporary earth berm, fiber rolls, gravel bags, silt fences, stabilized construction entrances and similar measures, coordinated with its construction procedures, as necessary and as shown on the Plans to control on site and off site erosion during the construction period. The Contractor shall protect areas which have been cleared and grubbed prior to excavation or embankment operations, and which are subject to runoff during the duration of the contract. The criteria used to determine the appropriate erosion control measures shall be the “Best Management Practices”, hereinafter BMP, defined and described in the latest edition of the "California Storm Water Best Management – Construction Handbook" as published by the Storm Water Quality Task Force [go to the CASQA on-line bookstore at the following URL to purchase, download or view handbook(s)]:
http://www.cabmphandbooks.com
The Contractor shall maintain a copy of the latest edition of the "California Storm Water Best Management – Construction Handbook" on the Project site and shall conduct its operations in conformity to said Handbook.
08/11/2026 C11 254 of 436
143
Excavation and Embankment areas, while being brought to grade and during periods of completion prior to final surface construction, shall be protected from erosion and the resulting siltation of downstream facilities and adjacent areas, and be graded so as to direct runoff into impoundment areas within the limits of work where such runoff shall have pollutants removed by BMP methods. The Contractor shall provide protection by BMP measures to eliminate erosion and the siltation of downstream facilities and adjacent areas. These measures shall include all means necessary to prevent polluted runoff from leaving the site.
300-12.4 Payment.
Add the following new subsection:
300-12.4 Payment. Payment for all work required to provide Storm Water Pollution Prevention and Erosion Control shall be included in the lump sum price included in the Bid specified as Storm Water Pollution Prevention and Erosion Control. Such price shall include full compensation for preparing the Storm Water Management Permit, the Storm Water Pollution Prevention Plan (SWPPP) where applicable, performing erosion control and water pollution control, conforming to the operational requirements herein, providing and maintaining all BMPs, removing all construction BMPs, conforming to the requirements of the current State Water Resources Control Board of California Order, and no additional compensation will be allowed therefore.
SECTION 301 –SUBGRADE PREPARATION, TREATED MATERIALS,
AND PLACEMENT OF BASE MATERIALS
301-1 SUBGRADE PREPARATION.
301-1.1 General.
Modify this subsection to read as follows:
301-1.1 General. This subgrade preparation specification shall govern the preparation of natural, filled, or excavated material prior to the final placement of subbase or base material, geotextile fabric, drainage facilities, pavement, curbs and gutters, driveways, sidewalks, retaining walls or any concrete facilities or roadway structures. Subgrade preparation shall include, but not be limited to scarification and moisture adjustment and compaction of the top twelve inches (12”) of the subgrade in the pavement areas to ninety-five percent (95%) relative compaction, and attendant work, export of remaining excess material to a disposal site or spoil area acquired by the Contractor and pumping and disposal of storm and ground water. In areas where existing utilities may interfere with subgrade preparation work in the roadway prism, the Contractor may choose to place geogrid to stabilize the subgrade and reduce the depth of excavation.
Geotechnical (soil) testing of all fill materials; subgrade, subbase, and base will be conducted by the Agency and the Geotechnical Engineer. Geotechnical (soil) tests may include relative compaction tests, sand equivalent tests, sieve analysis, R-values, etc. The results shall be presented directly by 08/11/2026 C11 255 of 436
144
the laboratory to the Engineer. No base or PCC pavement shall be placed prior to the subgrade or subbase being compacted, tested and approved by the Engineer.
The cost of any initial geotechnical (soil) tests shall be borne by the Agency. Additional geotechnical (soil) tests due to the failure of one (1) or more of the initial tests shall be conducted by the laboratory and any expenses borne by the Contractor. The Contractor shall make allowances in his construction procedure to permit testing of the Work in progress by the Engineer, authorized representative or the Inspector, and no additional compensation shall be paid to the Contractor for delays due to testing.
301-1.7 Payment.
Revise this subsection to read as follows:
301-1.7 Payment. The BID SCHEDULE DOES NOT include a bid item for subgrade preparation. Full compensation for Subgrade Preparation required to perform the construction operations specified or shown on the Plans will be considered as included in the price bid for the related items of work], and no additional compensation will be allowed therefore.
Payment for grading operations in areas designated as “grade only” will be considered as included in the price for excavation or fill.
301-2 UNTREATED BASE.
301-2.1 General.
Add the following to this subsection:
Concrete curb, gutter, sidewalk, driveway, and flatwork shall be placed on untreated compacted aggregate base, unless the existing material under the areas being repaired is determined to be firm and unyielding by the Engineer. New Asphalt Concrete Pavement shall also be placed on untreated compacted aggregate base. Untreated compacted aggregate base shall have the following thicknesses under respective concrete surface improvement unless shown otherwise on the Plans or specified:
PCC Sidewalk shall be placed on six inches (6”) of untreated compacted aggregate base.
PCC Curb and Gutter shall be placed on six inches (6”) of untreated compacted aggregate base.
PCC Driveway Entrance shall be placed on six inches (6”) of untreated compacted aggregate base.
Asphalt Concrete Pavement shall be placed on untreated compacted aggregate base, using the thicknesses shown on the Plans.
The Contractor will be allowed to reuse any existing base that is removed if the base material is removed without being contaminated by subgrade soils or other deleterious materials. The re-used base material must be moisture conditioned and compacted to 95% relative compaction (unless otherwise specified). The Contractor shall provide water and compact the surface of any base material 08/11/2026 C11 256 of 436
145
that will form the foundation for subsequent improvements, to meet the requirements of the Plans and specifications. The Contractor shall remove and replace any existing aggregate base that becomes contaminated.
301-2.3 Compacting.
Add the following as the first paragraph:
301-2.3 Compacting. It shall be the Contractor’s responsibility to provide adequate equipment and methods to accomplish the Work in accordance with these Specifications. The grading shall be done to the elevations provided in the Plans. Any field conditions that prevent the Contractor from matching design elevations shall be immediately notified to the Engineer.
Revise the third paragraph of this subsection to read as follows:
The relative compaction of each layer of compacted base material shall not be less than ninety- five percent (95%) for curbs, driveways and pavement for a minimum depth of one foot (1.0’) below the grading plane. Compaction under sidewalks and in the excepted areas shall be as specified in Subsection 211-1 (“COMPACTION TESTS.”) with each layer of compacted base material having a minimum compaction of ninety percent (90%).
301-2.4 Measurement and Payment.
Revise this subsection to read as follows:
301-2.4 Measurement and Payment. The quantities of new untreated aggregate base will be calculated using the square footage of the improvements constructed on the base, multiplied by the thickness of the base shown on the plans or specified. If the Engineer directs the Contractor to place additional base, the thickness requested by the Engineer will be used in calculating the pay quantity.
If the base thickness is increased by the Contractor for his convenience or to avoid performing additional required subgrade preparation, the additional base will not be included in the pay quantity.
Because the determination of whether untreated aggregate base will be needed in certain areas depends on the condition of the existing materials, it is a rough estimate for bidding purposes.
To confirm the pay quantities, the Contractor shall furnish to the Engineer at the time of delivery of the material to the job site a legible copy of a licensed weigh master’s certificate showing gross, tare, and net weights of each truckload of untreated base. Failure of the Contractor to provide a certificate to the Engineer by the end of the day on which the material represented by such certificate is delivered to the job site may, at the discretion of the Engineer, result in the forfeiture of all payment for such material, including any labor and equipment costs or related costs included in the price for furnishing and placing the untreated base.
Payment for untreated compacted aggregate base will be made by Bid Price per CUBIC YARD as shown in the bid. Such bid price shall include full compensation for clearing and grubbing; earthwork; subgrade preparation; supplying, placing, spreading, compacting, and finishing the untreated base; 08/11/2026 C11 257 of 436
146
and all other work required to perform the construction operations specified or shown on the Plans, and no additional compensation will be allowed therefore.
SECTION 302 – ROADWAY SURFACING
Revise this subsection to read as follows:
302-5 ASPHALT CONCRETE PAVEMENT.
302-5.1 General.
Modify the first paragraph of this subsection to read as follows:
302-5.1 General. Asphalt concrete pavement shall consist of two (2) or more courses of a mixture of paving asphalt and graded aggregate as specified in Subsection 203-6 (“ASPHALT CONCRETE.”), placed on a prepared surface of existing or new untreated base, or over existing paving, as necessary to construct the roadway as shown on the Plans or as required to complete the Work (i.e. where new curb is placed, utility cuts, and manhole reconstruction area). The courses shall be of the type of mixture specified. The thickness of asphalt concrete pavement for initial patch areas next to gutters, spandrels, and curbs shall be a minimum of six inches (6”), and the thickness in trenches next to curbs and driveways and in trenches shall be one-inch (1”) thicker than the existing pavement. The initial asphalt concrete patch base course for the items of work shown on the Plans shall be placed full depth from the aggregate base to the existing pavement surface as soon as the adjacent improvements are cured sufficiently to allow the paving to proceed. The initial asphalt concrete patch shall be placed in multiple move-ins to accommodate the required traffic control and staging phases, and to ensure that traffic is allowed to use the improvements as quickly as possible. Asphalt concrete in streets and parking lot areas where there is no base shall be placed on a prepared section of subgrade material to the thickness shown on the Plans. The surface course of asphalt concrete shall be a minimum of one and one-half inches (1-1/2”) thick with a one inch (1”) minimum thickness at the overlay key. The surface course shall be placed in the minimum number of move-ins necessary to accommodate the required traffic control and staging phases, but minimize the joints in the new asphalt concrete surface. Before the surface course is placed, the edges of existing pavement shall be cold milled to form an overlay key as shown on the Plans or as specified.
In a parking lot, the entire accessible parking stall and loading area shall not exceed two percent (2.00%) in any direction, NO EXCEPTIONS.
Add the following paragraph to read as follows:
Temporary asphalt concrete pavement and striping may be required to implement the traffic control and construction phasing shown on the Plans or specified. In sidewalk areas temporary AC surfacing shall be at least one inch (1”) thick. In the streets, a greater thickness may be required.
Temporary surfacing and striping shall be placed before the end of the work period so traffic can be restored at the time of day specified, and it shall remain in place or be replaced regularly until the area is ready for permanent pavement and striping. Full compensation for all work required to install, maintain, and dispose of temporary asphalt concrete pavement and striping will be considered as included in the price bid for Traffic Control and Construction Phasing and no additional compensation will be allowed therefore.
08/11/2026 C11 258 of 436
147
302-5.2.3 Tack Coat.
Replace the first sentence of the first paragraph in this subsection with the following:
If the asphalt concrete pavement is being constructed directly upon an existing hard-surfaced pavement, a Tack Coat of PG 64-10 paving asphalt shall be uniformly applied at a rate no less than
0.07 gallons per square yard (g/sq. yd.) upon the existing pavement preceding the placement of asphalt concrete. Payment for this item shall be included in the unit price for the related asphalt concrete pavement or overlay and no additional compensation will be allowed.
302-5.9 Placement.
302-5.9.1 General.
Add the following paragraphs to this subsection:
Asphalt paving equipment shall be equipped with automatic screed controls and a sensing device or devices. When placing asphalt concrete, the automatic controls shall control the longitudinal grade and transverse slope of the screed. Grade and slope references shall be furnished, installed, and maintained by the Contractor.
At locations where new asphalt concrete pavement joins an unimproved shoulder, the Contractor shall taper the new asphalt edge by raking out all aggregate three-eighths inch or larger (3/8+”) and feathering the new paving to form a smooth transition to join the unimproved shoulder. The transition shall extend a minimum of eighteen inches (18”) onto the shoulder. Additional tack coat shall be applied to all tapered transitions to prevent raveling of the new pavement. Tapers shall be raked, rolled, and compacted so there is no lip exceeding one-quarter inch (1/4”).
Should the methods and equipment furnished by the Contractor fail to produce a layer of asphalt concrete conforming to the requirements, including straightedge tolerance, of Subsection 302-5.11 Compaction and 302-5.12 Smoothness of the Standard Specifications, the paving operations shall be discontinued and the Contractor shall modify their equipment or furnish substitute equipment.
Careful attention shall be given to maintaining proposed surface drainage conditions during placement of asphalt overlay. Unless otherwise directed by the Engineer, existing drainage patterns shall be maintained.
Should the automatic screed controls fail to operate properly during any work period, the Contractor may use manual control of the spreading equipment for the remainder of the work period; however, the equipment shall be corrected or replaced with alternative automatically controlled equipment conforming to the requirements in this Subsection before starting another work period.
Prior to placing asphalt concrete, the Contractor shall provide covers over all existing storm drain grates and inlets to prevent entry of debris.
08/11/2026 C11 259 of 436
148
The streets identified for overlay may have rutting, offset crowns, high spots, or low spots that need to be corrected to re-establish the proper street grade. Cold milling shall be used to remove high spots.
Tack coat and leveling courses of asphalt concrete shall be placed to fill low spots and ruts and to re- establish street grades prior to the placement of asphalt concrete overlay. The Contractor shall use cold milling to remove high spots and to provide joints for AC leveling course, in areas as directed by the Engineer. The Contractor shall place tack coat in the areas delineated by the Engineer, and rake the edges of the variable thickness AC leveling course to create smooth feathering. If a quantity of AC leveling course is included in the Bid Schedule, it is a rough estimate for bidding purposes. If Leveling Course is needed, that work shall be directed by the Engineer in the field. The Contractor shall cooperate with the Engineer in placing the leveling course as required to re-establish street grades, and perform the work as directed by the Engineer.
302-5.9.2 Joints.
Replace the first paragraph in this subsection with the following:
Longitudinal joints between successive runs shall be placed to match striped lane lines. If this placement pattern cannot be met, joints between successive runs shall be in the center of the driving lane.
302-5.12 Smoothness.
Add the following paragraphs to this subsection:
Contractor shall have a ten foot (10’) straightedge onsite at all times during all paving operations for use in checking the smoothness of the surface.
The finished surface of the asphalt concrete pavement shall be placed three-eighths inch (3/8”) above the gutter lip to allow full compaction of the asphalt at the gutter edge and to prevent damage to the gutter lip caused by the roller.
At curb ramps the finished surface of the asphalt concrete pavement shall be placed one-eighth inch (1/8”) above the gutter lip. If the asphalt concrete surface is more than one-quarter inch (1/4”) above the lip or if the slope of the asphalt concrete surface at the gutter lip exceeds five percent (5%), the Contractor shall grind the pavement until it is equal to or less than five percent (5%) and flush with the gutter lip.
302-5.14 Payment.
302-5.14.5 Asphalt Concrete
Modify the first paragraph of this subsection to read as follows:
302-5.14.5 Asphalt Concrete. Asphalt concrete pavement for asphalt concrete overlay and for new structural section of asphalt concrete will be paid for at the Contract Unit Price per Ton as shown in the bid. Quantities of asphalt concrete pavement will be determined by adding up the total of all certified material tickets for asphalt concrete delivered and placed for the Project. The unit price bid 08/11/2026 C11 260 of 436
149
for asphalt concrete pavement shall include full compensation for clearing and grubbing, unclassified excavation and fill, cold milling, subgrade preparation and applying tack coat, supplying and placing the base course and surface course asphalt concrete, compacting and finishing the asphalt concrete pavement, and all other related items of work, and no additional compensation will be allowed. Re- setting or adjusting manholes, covers, vaults, valves, boxes or other miscellaneous facilities to grade will be paid for as provided in Subsection 403-5 (“PAYMENT.”).
302-6 PORTLAND CEMENT CONCRETE PAVEMENT.
302-6.1 General.
Add the following after the first sentence of the first paragraph in this subsection:
Formwork shall be approved by the Engineer before placing concrete. The work shall include, but not be limited to, the saw cutting, removal and disposal of AC and sub-base, sub-grade preparation, base material, compaction, placement, materials, rebar, all labor, tools, equipment and incidentals necessary to do all of the work as specified on the Plans or as directed by the Engineer.
302-7 PAVEMENT FABRIC.
302-7.2 Placement.
302-7.2.1 General.
Add the following paragraph to this subsection:
The surface of the pavement shall be swept to remove debris, then air-blown to remove dust.
Distressed pavement shall be dug out and replaced. High points, edges and joints shall be cold milled.
Tack Coat and AC Leveling Course shall be placed to correct low points and ruts. Striping and pavement markers shall be removed. Pavement fabric and tack coat shall be placed over all asphalt areas to receive asphalt overlay to form a bond between the existing and new asphalt concrete, and a waterproof barrier. Pavement fabric shall be applied with a mechanical unit mounted on the front of a tractor and laid without wrinkles.
302-7.2.2 Tack Coat.
302-7.2.2.1 General.
Modify the first sentence of the first paragraph to read as follows:
302-7.2.2.1 General. Tack coat shall be PG 64-10 paving asphalt.
Modify the first sentence of the second paragraph to read as follows:
Tack coat shall be sprayed with a truck-mounted sprayer at the rate of 0.25 +/- 0.02 gallons per square yard (g/sq.yd.) during the day, or a rate of 0.23 +/- 0.02 gallons per square yard (g/sq.yd.) for night work.
08/11/2026 C11 261 of 436
150
302-9 ASPHALT RUBBER HOT MIX (ARHM).
302-9.4 Rolling.
Modify the first sentence to read as follows:
302-9.4 Rolling. Rolling shall conform to 302-5.10 except that vibratory steel drum rollers using the vibratory mode shall be used for initial breakdown rolling.
SECTION 303 – CONCRETE AND MASONRY CONSTRUCTION
303-1 CONCRETE STRUCTURES.
303-1.1 General.
Add the following paragraph to this subsection:
Concrete footings for traffic signals and street lights and other structures such as steps, ramps and walls shall conform to these Plans, City of Vista Standards, Caltrans Standard Plans and Standard Specifications, the California Building Code (CBC) and the San Diego Regional Standard Drawings (SDRSD). If not otherwise specified in the Caltrans Specifications, concrete footings shall conform to these specifications and shall be approved by the Engineer. Full compensation for all required work to construct concrete footings will be considered as included in the related items of work.
303-5 CONCRETE CURBS, WALKS, GUTTERS, CROSS GUTTERS, ALLY INTERSECTIONS, ACCESS RAMPS, AND DRIVEWAYS.
303-5.1 Requirements.
303-5.1.1 General.
Modify the second paragraph of this subsection to read as follows:
Unless otherwise prescribed in Subsection 303-5.1.3 (“Concrete Driveway Entrance”), the minimum thickness of walks shall be four inches (4”). The height of curbs and the thickness of gutters, cross gutters, alley intersections, curb ramps and driveway aprons shall be as shown on the Plans.
303-5.1.2 Drainage Outlets Through Curb.
Modify the first paragraph of this subsection to read as follows:
Drains shall be constructed beneath the sidewalk as shown in SDRSD No. D-27 (“SIDEWALK UNDERDRAIN PIPE”) to connect existing building drains or yard drains along the line of Work through curb outlet sleeves to the gutter, or to serve low areas on adjacent property where pre-existing drainage conditions have been affected by the Work. Each separate parcel shall be provided with a minimum of two (2) drains, one (1) at the low side of the parcel and one (1) at the high side of the driveway, or 08/11/2026 C11 262 of 436
151
as shown on the Plans. Payment for all work required to install curb sleeves and under-sidewalk drains will be considered as included in the related concrete items, and no additional compensation will be allowed therefore.
303-5.1.3 Driveway Entrances.
Add the following paragraphs to this subsection:
Where walk is constructed adjacent to driveways, both commercial and residential, provisions shall be made for an accessible walkway within the right-of-way at the back of the sloped driveway apron, with a minimum width of forty-eight inches (48”) and a maximum cross slope of two percent (2.00%).
The longitudinal slope of the walk shall match the slope of the street, taken at the gutter lip or gutter flow line.
PCC Driveway Entrances and PCC Driveways shall be in accordance with City of Vista Development Code Section 16.57.090, with smooth transitions to join existing improvements. No slope shall exceed 20% and no angle of approach or departure shall exceed ten percent (10%)
303-5.1.4 Curb and Gutter.
Add the following new subsection:
303-5.1.4 Curb and Gutter. PCC Curb and Gutter shall be formed along the gutter lip using specified form material. For projects where curb and gutter is being constructed adjacent to existing pavement, a section of pavement twelve inches (12”) wide, measured from the lip of the gutter, shall be removed to allow for the gutter lip to be formed. The twelve inch (12”) slot shall be paved after the curb and gutter is fully cured, to avoid damage from paving operations.
The Contractor shall exercise great care to construct curbs conforming strictly to ADA standards at locations where curb ramps will be constructed. The curb face shall be depressed to a flush surface with no lip at the flowline. The slope of the asphalt leading up to the curb ramp shall not exceed five percent (5.00%) for a distance of four feet (4’) with a maximum two percent (2.00%) cross slope per SDRSD No. G-32A.
The Contractor shall install eight inch (8”) mow curb in accordance with the San Diego Regional Standard Drawing (SDRSD) No. L-3 (“CONCRETE MOWING STRIP”). All mow curb shall be reinforced as shown on the standard drawing. New mow curb shall have weakened plane joints every ten feet (10’), and expansion joints every thirty feet (30’) and where new mow curb joins other improvements.
The Contractor shall identify locations of water and sewer laterals by stamping a “W” for water service and an “S” for sewer laterals in the green concrete curb after finish troweling is complete. The stamps shall be professionally fabricated, with letters three inches (3”) high.
Expansion joints are required only at beginning and ending of curb returns.
08/11/2026 C11 263 of 436
152
303-5.1.5 Walks.
Add the following new subsection:
303-5.1.5 Walks. Sidewalks shall be constructed in strict conformance with ADA standards. The cross slope on sidewalks shall in no case exceed two percent (2.00%). The clear width of sidewalk shall not be less than forty-eight inches (48”), measured from the back of curb. Construction tolerances shall not be a reason to exceed the minimum or maximum standards of the ADA. The width of the top of the curb cannot be counted as part of the sidewalk clearance.
If a monolithic retaining curb at the back of curb ramp or sidewalk with a maximum height of six inches (6”) is required to minimize erosion or match existing improvements or earth, the Contractor shall construct those retaining curbs at the back of the curb ramp or sidewalk to the limits determined by the Engineer. Retaining curbs shall not reduce the sidewalk clear width below the minimum of forty- eight inches (48”).
Where curbs are sleeved to provide connections to the gutter for yard drains, new sidewalk shall be constructed with under-sidewalk drains, in accordance with Subsection 303-5.1.2 (“Drainage Outlets Through Curb.”) and SDRSD D-27 (“SIDEWALK UNDERDRAIN PIPE”).
Any irrigation facilities removed or adjusted for the construction of the sidewalk or other work shall be replaced, relocated, or re-configured with similar materials, so that the irrigation system is fully functional. Unless there is a bid item for landscaping and irrigation, payment for this work will be considered as included with other items of work.
Any turf, sod or landscaping removed adjacent to the Work for the construction of the sidewalk shall be replaced with new turf, sod or landscaping of the same type from a commercial nursery.
Unless there is a bid item for landscaping and irrigation, payment for this work will be considered as included in the related items of work.
Expansion joints are required only at beginning and ending of curb returns.
303-5.1.6 Curb Ramp.
Add the following new subsection:
303-5.1.6 Curb Ramp. PCC Curb Ramp shall be constructed in strict conformance with ADA standards. The ADA standards are shown in the latest edition of the San Diego Regional Standard Drawings (SDRSD). For the construction of curb ramps, the Contractor shall refer to, and comply with, all of the requirements for curb ramps shown in the most recent version of the SDRSD Nos. G-27 through G-32B (“CURB RAMP”) (inclusive). The City of Vista has developed a checklist of ADA standards for curb ramps, to be used by the Contractor and the Engineer in confirming compliance with ADA standards for sidewalks and any type of curb ramps. The checklist is either included in the appendices to these specifications (see list of Appendices in Table of Contents on Page 2), or is available to the Contractor upon request.
08/11/2026 C11 264 of 436
153
The Contractor shall modify, adjust or relocate any adjacent improvements so the curb ramp can be constructed to ADA Standards. Before the placement of any concrete curb or curb ramp, the Contractor shall notify the Engineer if it appears that the specified maximum slopes will be exceeded due to existing conditions, to allow the Engineer the opportunity to provide direction. If the Engineer determines that a TYPE C CURB RAMP (per SDRSD No. G-29) must be constructed instead of a TYPE A or TYPE B CURB RAMP (per SDRSD No. G-27), to fit existing conditions or minimize impacts to private property, the Contractor shall construct the alternate type of ramp. The Engineer shall pay the bid price for the specified ramp if there is no bid price for the alternate ramp.
If a monolithic retaining curb with a maximum height of six inches (6”) is required to minimize erosion or match existing improvements at the back side of the curb ramp, the Contractor shall construct those curbs at the back of the sidewalk to the limits determined by the Engineer, otherwise they may be eliminated. Retaining curbs shall not reduce the clear width of the landing below the minimum of forty-eight inches (48”).
The Contractor shall depress the curb to flush (0” curb face) in front of the curb ramp to meet ADA standards. The Contractor shall construct the road paving or remove and replace sufficient asphalt concrete paving and base to provide a four foot (4’) minimum square landing area, measured from the gutter flowline, where the slopes do not exceed five percent (5%) in any direction per California Building Code (CBC) 1127 B.5.3. The surface of the curb ramp and side flares shall be of contrasting finish from that of the adjacent sidewalk per CBC 1127 B.5.5.
If a diagonal curb ramp on a corner is being constructed at a crossing marked on the pavement, the Contractor shall provide twenty-four inch (24”) long segments of straight curb on each side of the curb ramp, per CBC 1127 B.5.9.
The Contractor shall install a detectible warning surface pad on all pedestrian access ramps and curb ramps leading to hazardous area (e.g. vehicular traffic), as shown on the Plans or in the Standard Plans. The detectable warning surface pad shall extend the full width of the ramp forty-eight inches (48”) minimum and shall measure at least thirty-six inches (36”) along the ramp slope. The detectable warning surface pad or tile shall be securely attached to the surface of the concrete using adhesive and anchors as recommended by the manufacturer of the detectible warning surface. The concrete surface shall be recessed if required by the manufacturer of the detectable warning pad, and the Contractor shall follow all other manufacturer installation instructions. The detectable warning surface pad shall be integrally-colored “DARK GRAY” at all pedestrian access ramps (or curb ramps) on street intersections.
The Contractor shall include in the unit price for Curb Ramps all related costs not covered by other bid items.
303-5.2 Forms.
303-5.2.2 Slip-Forms.
Add the following sentence to the end of the first paragraph in this subsection:
Contractor shall give Engineer the opportunity to confirm the slip-form shoe is set at the correct batter for the concrete curb and gutter.
08/11/2026 C11 265 of 436
154
303-5.5 Finishing.
303-5.5.4 Gutter.
Add the following before the first sentence of the first paragraph in this subsection:
303-5.5.4 Gutter. Cross gutters and spandrels shall be constructed in accordance with the Plans.
Prior to acceptance of the valley gutter constructed by the Contractor, a flow test shall be conducted by the Contractor in the presence of the Engineer. Any new work found to be defective shall be repaired or replaced by the Contractor in accordance with Subsection 303-5.7 (“Repairs and Replacements.”).
303-5.7 Repairs and Replacements.
Modify this subsection to read as follows:
303-5.7 Repairs and Replacements. Any new work found to be defective or damaged, cracked, chipped, discolored, improperly finished, heaved, vandalized, or for any other reason does not conform to the specifications, prior to its acceptance, shall be replaced by the Contractor, at the Contractor’s expense, as approved by the Engineer.
The Contractor shall exercise great care in the construction of curb ramps to ensure compliance with the ADA standards. Any curb ramps that do not satisfy the ADA requirements in any aspect, including exceeding the minimum or maximum values by ANY amount, shall be removed and replaced by the Contractor at his expense. Construction tolerances shall not be a reason to exceed the minimum or maximum standards of the ADA.
303-5.9 Measurement and Payment.
Modify this subsection to read as follows:
303-5.9 Measurement and Payment. The BID SCHEDULE lists various items that include concrete construction. Items of work shall be measured and paid for as shown in the Bid.
PCC Curb & Gutter shall be measured and paid for by the linear foot as stated in the BID SCHEDULE. Quantities of curb and gutter will be measured along the line of the curb, around curb returns, and across curb ramps and driveway entrances. Pay quantities for PCC Curb and Gutter will NOT include concrete improvements with monolithic curbs covered by separate items in the bid, such as curb ramps, cross gutters (and spandrels), alley aprons, parking areas and special driveway entrances. Full compensation for any necessary work required to perform the construction operations specified or shown on the Plans, including clearing and grubbing, earthwork, subgrade preparation, removing and replacing existing pavement to allow forming of the gutter lip, installing joints per SDRSD Nos. G-9 and G-10 (“SIDEWALK JOINT LOCATIONS” & “CONCRETE JOINT DETAILS”), installing sleeves for drains, and depressing curbs for driveway entrances and curb ramps, will be considered as included in the linear foot price bid for PCC Curb & Gutter, and no additional compensation will be allowed therefore.
08/11/2026 C11 266 of 436
155
“PCC Driveway Entrance” of the various types specified, including “Concrete Driveway” per SDRSD G-14A through G-14G, and “Alley-Type Driveway” per City of Vista Standard Drawing SRF-05A, shall be measured and paid for as stated in the BID SCHEDULE. Quantities of “PCC Driveway Entrance” will be measured to include all concrete flatwork that is thicker than adjacent sidewalk, from the back of the curb to the back of the accessible walkway area across the driveway and between the tops of the wings where the curb height is transitioning. Quantities of “Alley-Type Driveway” will be measured from the lip of the gutter to the back of the accessible walkway area across the driveway, and between the tops of the ramps where the curb height is transitioning. If a monolithic retaining curb is required for the driveway, the top surface quantity of the retaining curb will be added to the quantity of the driveway.
Full compensation for any necessary work required to perform the construction operations specified or shown on the Plans, including clearing and grubbing, earthwork, subgrade preparation, adjusting locations of driveways and widths of wings to meet City of Vista Standards, and installing joints per SDRSD Nos. G-9 and G-10 (“SIDEWALK JOINT LOCATIONS” and “CONCRETE JOINT DETAILS”), will be considered as included in the square foot or lump sum price bid for “PCC Driveway Entrance” or “Alley- Type Driveway”, of each type specified, and no additional compensation will be allowed therefore.
PCC Sidewalk shall be measured and paid for by the square foot as stated in the BID SCHEDULE.
Quantities of PCC Sidewalk will be measured from the back of the curb to the back of the walk, and between adjacent concrete improvements covered by separate items in the bid, such as driveway entrances, curb ramps, cross gutters or alley aprons. The top surface of monolithic retaining curb with a maximum height of six inches (6”) will be included in the quantity of sidewalk. Full compensation for any necessary work required to perform the construction operations specified or shown on the Plans, including clearing and grubbing, earthwork, grading adjacent swales for drainage, subgrade preparation, placing reinforcing steel and dowels, installing joints per SDRSD Nos. G-9 and G-10 (“SIDEWALK JOINT LOCATIONS” and “CONCRETE JOINT DETAILS”), installing under-sidewalk drain pipes through curb sleeves to the gutter and providing monolithic retaining curbs or toe curbs as shown on the Plans or where designated by the Engineer, will be considered as included in the square foot price bid for PCC Sidewalk and no additional compensation will be allowed therefore.
For other items of work that include concrete construction for which there is no bid item, the cost of such items shall be included in the related Bid Items. Full compensation for any necessary work required to perform the construction operations specified or shown on the Plans will be considered as included in the price bid for the related items of work and no additional compensation will be allowed therefore.
SECTION 306 – OPEN TRENCH CONDUIT CONSTRUCTION
306-3.2 Removal of Surface Improvements.
Modify this subsection to read as follows:
306-3.2 Removal of Surface Improvements. Bituminous pavement, concrete pavement, landscaping, fences, curbs, sidewalks, or driveways removed in connection with construction shall be removed and reconstructed in accordance with these specifications.
08/11/2026 C11 267 of 436
156
306-5 DEWATERING.
Add the following paragraphs to this subsection:
The groundwater removal work shall include furnishing, installing, and operating a dewatering system capable of dewatering any excavation for any work in progress or planned, and subsequent removal of such equipment from the site.
The Contractor shall limit the area to be excavated at any one time to that area which can be properly dewatered by the equipment in use. The equipment in use shall be both capable of removing any water that accumulates in the excavation and maintaining the excavation in a dry condition while construction is in progress. The surface of the ground shall be sloped away from the excavation or temporary dikes or pipe culverts provided to prevent surface water from entering the excavation.
Disposal of the water from the dewatering system shall be in such a way as not to damage or overload the existing drainage facilities in the area. Protect from injury any portion of the Work completed or in progress, surfaces of streets, lawns or private property. No water shall be directed across a public street outside the construction limits.
All water encountered during the excavation shall be disposed of by the Contractor in such a manner as will not damage public or private property or create a nuisance or health menace. The Contractor shall furnish, install, and operate pumps, pipes, appliances, and equipment of sufficient capacity to keep all excavations free from water until the excavation is backfilled, unless otherwise authorized by the Engineer. The Contractor shall provide all means or facilities necessary to conduct water to the pumps.
Discharge of pumped groundwater shall be in conformance with the requirements of the Regional Water Quality Control Board, the County of San Diego Department of Environmental Health, the City of Vista, and other agencies having jurisdiction. The Contractor shall obtain all required permits before pumped water from naturally occurring groundwater or from rainfall is discharged to any storm drain or sewer. A means shall be provided for desilting the water before discharging it where required by the Engineer or by the terms of the discharge permits.
306-12 BACKFILL.
306-12.1 General.
Add the following after the second paragraph in this subsection:
Material obtained from the project excavations may only be used as backfill after it has been determined to be acceptable and approved by the Geotechnical Engineer and the Engineer.
306-12.2 Backfill for Narrow Trenches.
Modify the first paragraph of this subsection to read as follows:
306-12.2 Backfill for Narrow Trenches. All narrow trenches for electrical and irrigation work shall be backfilled immediately after inspection and approval of the conduit placement by the Agency 08/11/2026 C11 268 of 436
157
Inspector to minimize the length of time traffic control is required for the trench work. Narrow trenches are defined as ten inches (10”) or less in width. Backfill for narrow trenches shall be placed as specified in Subsection 306-12.1 (“General.”) except as modified herein. Narrow trenches shall be backfilled by use of trench backfill slurry per Subsection 201-1 (“PORTLAND CEMENT CONCRETE.”), unless otherwise approved by the Engineer. Asphalt Concrete resurfacing of the trench per City of Vista Standard Drawings SRF-08A and SRF-08B (“TRENCH PAVING STANDARD”) may commence with other paving operations.
306-12.4 Jetted Trench Backfill.
306-12.4.2 Compaction Requirements.
Replace the first paragraph in this subsection with the following:
306-12.4.2 Compaction Requirements. Except as specified otherwise, trench bedding and backfill densified thru jetting shall be densified to a minimum ninety percent (90%) relative compaction.
306-14 MEASUREMENT.
306-14.7 Valves, Hydrants, Buried Structures, and Pipeline Appurtenances.
Add the following after the first paragraph in this subsection:
Water valves and fire hydrants shall be installed as shown on the Plans, installed per Vista Irrigation District (VID) standards, and inspected by VID.
Relocate Fire Hydrant shall consist of trenching, removing existing fire hydrant and lateral up to the main line tee, installing a blind flange on the terminated tee, installing new tee on main line, six- inch (6”) PVC lateral, concrete thrust blocking, PVC elbow, PVC extension spool, break off check valve, extension spool, reinstalling existing fire hydrant to the location shown on the Plans, trench restoration, painting fire hydrant, and other Work necessary to provide a fully functional and operational fire hydrant to VID Standards.
306-14.8 Temporary Resurfacing
Modify this subsection to read as follows:
Unless otherwise specified, temporary resurfacing will not be measured separately for payment.
306-15 PAYMENT.
306-15.9 Temporary Resurfacing.
Modify the first paragraph in this subsection to read as follows:
08/11/2026 C11 269 of 436
158
Full compensation for the furnishing, placing, maintaining, removing, and disposing of temporary resurfacing materials shall be included in the unit price of the underground conduit.
Add the following new Section: