cc 2026 AR 09/08 cip 8398 wave concrete deck replacement project award of contract
Meeting
September 8, 2026
Body
Vista City Council
Pages
2
Original file
368 KB
Text extracted from the city's file for reading and search. Open the original on portal.laserfiche.com. That file is the official record.

600 Eucalyptus Avenue * Vista, CA 92084 * 760-639-6100 * Fax 760-639-6101 This information is available in an alternate format by request to Joan Turley at (760) 639-6100 Permit Application Demolition Permits, the receipts for the demolition waste must be provided As part of the permit application process, complete the form and fill in the and approved before the first footing inspection after the Building Permit has two columns under "Before Construction". The two columns are the estimated been issued. amount of waste to be stent to a landfill and the estimated amount of waste to be reused or recycled. Please include all materials. The information in these columns are only estimates and should be calculated based upon your experience. .

A guide to the amount of materials generated by project for your reference is in the opposite column. To calculate estimated diversion rate, divide the total diversion tonnage by the sum of the landfill and diversion tonnages and then multiply by 100:

Diversion / (Diversion + Landfill) x 100
Infeasibility Exemption - If the estimated diversion rate is less than 50%, please Basic Conversion Factors submit an explanation as to why this project cannot achieve the goal.

Permit Application
Any applicant who does not comply with this requirement may be assessed a penalty of up to $1,000.

Cubic Yard/Ton

1.38 CY/Ton
20 CY/Ton
4 CY/Ton

6.7 CY/Ton

13.3 CY/Ton

5.7 CY/Ton
Material
Asphalt & Concrete
Cardboard
Drywal I
Lumber / Wood
Metals
Mixed waste
Lbs./Cubic Yard
1,380 lbs./CY
I00 Ibs./CY
500 Ibs./CY
300 Ibs./CY
150 Ibs./CY
350 Ibs./CY
09/08/2026 C4 238 of 383

113
Appendix D:

Staging Area

09/08/2026 C4 239 of 383

Potential staging area. 6' Site fence
with shade cloth required.

Equipment access area. Protect artificial grass
with plywood. Replace any sections destroyed by
project.

Potential Staging and Storage Area
09/08/2026 C4 240 of 383

114
Appendix E:

Plan Set

09/08/2026 C4 241 of 383

09/08/2026 C4 242 of 383

ENGINEER OF WORK RCE EXPIRES DATE
97719 09/30/27 06/01/26

CITY OF VISTA
200 CIVIC CENTER DRIVE
VISTA, CA 92084

APPROVED
SHEET 1 OF 6

CITY OF VISTA
IMPROVEMENT PLANS FOR:THE WAVE CONCRETE DECK

REPLACEMENT PROJECT
CIP 8398CITY ENGINEER RCE EXPIRES DATE
55075 06/30/26 SEE TITLE SHEET
09/08/2026 C4 243 of 383

Remove and replace clean out with new clean out per detail Remove existing trench drain (detail ) with new trench drain per detail Protect in place. Tie new area drains, clean outs, and trench drain into existing system.

Remove existing area drain and replace with drain per detail Protect in place.
6 SP-6
9 SP-3
5 SP-6
8 SP-6
Install new 3" PVC.

Install new drain per 5
SP-6

STORM DRAIN PIPEING PLAN

ENGINEER OF WORK RCE EXPIRES DATE
97719 09/30/27 06/01/26

CITY OF VISTA
200 CIVIC CENTER DRIVE
VISTA, CA 92084

APPROVED
SHEET 2 OF 6

CITY OF VISTA
IMPROVEMENT PLANS FOR:THE WAVE CONCRETE DECK

REPLACEMENT PROJECT
CIP 8398CITY ENGINEER RCE EXPIRES DATE
55075 06/30/26 SEE TITLE SHEET
09/08/2026 C4 244 of 383

ENGINEER OF WORK RCE EXPIRES DATE
97719 09/30/27 06/01/26

CITY OF VISTA
200 CIVIC CENTER DRIVE
VISTA, CA 92084

APPROVED
SHEET 3 OF 6

CITY OF VISTA
IMPROVEMENT PLANS FOR:THE WAVE CONCRETE DECK

REPLACEMENT PROJECT
CIP 8398CITY ENGINEER RCE EXPIRES DATE
55075 06/30/26 SEE TITLE SHEET
09/08/2026 C4 245 of 383

ENGINEER OF WORK RCE EXPIRES DATE
97719 09/30/27 06/01/26

CITY OF VISTA
200 CIVIC CENTER DRIVE
VISTA, CA 92084

APPROVED
SHEET 4 OF 6

CITY OF VISTA
IMPROVEMENT PLANS FOR:THE WAVE CONCRETE DECK

REPLACEMENT PROJECT
CIP 8398CITY ENGINEER RCE EXPIRES DATE
55075 06/30/26 SEE TITLE SHEET
09/08/2026 C4 246 of 383

Min. 20”Min. 20”
Min
i
m
u
m
8”
Install FL Series frame flush with concrete or 1/16"
below grade (to allow for snowplow clearance).

Concrete reinforced with
rebar reinforcement or
equivalent.
25 5/8”

BLACKTOP CONCRETE SUBGRADE SAND
Expansion joint filled
with petrol resistant
mastics.

Joint tied with
24” long x 1/2”
dowel at 24” c/c.

Half bonded.

VERY IMPORTANT
The underside of the frame must
be adequately supported by
concrete - concrete installers
must work the concrete so that it
flows under the frame.

Fiberlite FL96 or approved equal.
12 "A"
Min. 20
SKIRT
Minimum
8 Maximum
14 OUTER EDGE "A' OF FRAME SET 1/4” - 1/2”

ABOVE GENERAL FORECOURT AREA WITH
CONCRETE RAMPED AWAY OVER 12”
24 VERY IMPORTANT
Expansion joint filled
with petrol resistant
mastic.

VERY IMPORTANT
The underside of the frame
must be adequately
supported by concrete.

Concrete reinforced with
2 layers of reinforcement
mesh.

Joint tied with
24 long x 1/2”
dowel at 24” c/c.

Half bonded
Fiberlite FL760 or approved equal.
4 1/8"2 7/16"
1 1/2"
2 7/16"
1 1/2"
6"
6"
6"
1"
New grating to be "Grate Technologies INC." 1" Vinyl, U.V. Grating W/non-slip surface. Color to be gray. provide angle embed and install per manufactures recommendations . 12"x12".
4" PVC pipe to outlet
No leak flange
#4 @12"O.C EW
Centered
2 coats of waterproofing
per spec.

ENGINEER OF WORK RCE EXPIRES DATE
97719 09/30/27 06/01/26

CITY OF VISTA
200 CIVIC CENTER DRIVE
VISTA, CA 92084

APPROVED
SHEET 5 OF 6

CITY OF VISTA
IMPROVEMENT PLANS FOR:THE WAVE CONCRETE DECK

REPLACEMENT PROJECT
CIP 8398CITY ENGINEER RCE EXPIRES DATE
55075 06/30/26 SEE TITLE SHEET
09/08/2026 C4 247 of 383

Photo 2.1- Lifeguard tower to be salvaged.Photo 1- Existing umbrella to be demoed.Photo 2.3- Lifeguard tower to be salvaged.Photo 2.2- Lifeguard tower to be salvaged. 09/08/2026 C4 248 of 383

115
Appendix F:

The Wave - AS Builts
09/08/2026 C4 249 of 383

09/08/2026 C4 250 of 383

09/08/2026 C4 251 of 383

09/08/2026 C4 252 of 383

09/08/2026 C4 253 of 383

09/08/2026 C4 254 of 383

09/08/2026 C4 255 of 383

09/08/2026 C4 256 of 383

09/08/2026 C4 257 of 383

09/08/2026 C4 258 of 383

09/08/2026 C4 259 of 383

09/08/2026 C4 260 of 383

09/08/2026 C4 261 of 383

09/08/2026 C4 262 of 383

09/08/2026 C4 263 of 383

09/08/2026 C4 264 of 383

09/08/2026 C4 265 of 383

09/08/2026 C4 266 of 383

09/08/2026 C4 267 of 383

09/08/2026 C4 268 of 383

09/08/2026 C4 269 of 383

09/08/2026 C4 270 of 383

09/08/2026 C4 271 of 383

09/08/2026 C4 272 of 383

09/08/2026 C4 273 of 383

09/08/2026 C4 274 of 383

09/08/2026 C4 275 of 383

09/08/2026 C4 276 of 383

09/08/2026 C4 277 of 383

09/08/2026 C4 278 of 383

09/08/2026 C4 279 of 383

09/08/2026 C4 280 of 383

09/08/2026 C4 281 of 383

09/08/2026 C4 282 of 383

09/08/2026 C4 283 of 383

09/08/2026 C4 284 of 383

09/08/2026 C4 285 of 383

09/08/2026 C4 286 of 383

09/08/2026 C4 287 of 383

09/08/2026 C4 288 of 383

09/08/2026 C4 289 of 383

09/08/2026 C4 290 of 383

09/08/2026 C4 291 of 383

09/08/2026 C4 292 of 383

09/08/2026 C4 293 of 383

09/08/2026 C4 294 of 383

09/08/2026 C4 295 of 383

09/08/2026 C4 296 of 383

09/08/2026 C4 297 of 383

09/08/2026 C4 298 of 383

09/08/2026 C4 299 of 383

09/08/2026 C4 300 of 383

09/08/2026 C4 301 of 383

09/08/2026 C4 302 of 383

09/08/2026 C4 303 of 383

09/08/2026 C4 304 of 383

09/08/2026 C4 305 of 383

09/08/2026 C4 306 of 383

09/08/2026 C4 307 of 383

09/08/2026 C4 308 of 383

09/08/2026 C4 309 of 383

09/08/2026 C4 310 of 383

09/08/2026 C4 311 of 383

09/08/2026 C4 312 of 383

09/08/2026 C4 313 of 383

09/08/2026 C4 314 of 383

09/08/2026 C4 315 of 383

09/08/2026 C4 316 of 383

09/08/2026 C4 317 of 383

09/08/2026 C4 318 of 383

09/08/2026 C4 319 of 383

09/08/2026 C4 320 of 383

09/08/2026 C4 321 of 383

09/08/2026 C4 322 of 383

09/08/2026 C4 323 of 383

09/08/2026 C4 324 of 383

09/08/2026 C4 325 of 383

09/08/2026 C4 326 of 383

09/08/2026 C4 327 of 383

09/08/2026 C4 328 of 383

09/08/2026 C4 329 of 383

09/08/2026 C4 330 of 383

09/08/2026 C4 331 of 383

09/08/2026 C4 332 of 383

09/08/2026 C4 333 of 383

09/08/2026 C4 334 of 383

09/08/2026 C4 335 of 383

09/08/2026 C4 336 of 383

09/08/2026 C4 337 of 383

09/08/2026 C4 338 of 383

09/08/2026 C4 339 of 383

09/08/2026 C4 340 of 383

09/08/2026 C4 341 of 383

09/08/2026 C4 342 of 383

09/08/2026 C4 343 of 383

09/08/2026 C4 344 of 383

09/08/2026 C4 345 of 383

09/08/2026 C4 346 of 383

09/08/2026 C4 347 of 383

09/08/2026 C4 348 of 383

09/08/2026 C4 349 of 383

09/08/2026 C4 350 of 383

09/08/2026 C4 351 of 383

09/08/2026 C4 352 of 383

09/08/2026 C4 353 of 383

09/08/2026 C4 354 of 383

09/08/2026 C4 355 of 383

09/08/2026 C4 356 of 383

09/08/2026 C4 357 of 383

09/08/2026 C4 358 of 383

09/08/2026 C4 359 of 383

09/08/2026 C4 360 of 383

09/08/2026 C4 361 of 383

09/08/2026 C4 362 of 383

09/08/2026 C4 363 of 383

09/08/2026 C4 364 of 383

09/08/2026 C4 365 of 383

09/08/2026 C4 366 of 383

09/08/2026 C4 367 of 383

09/08/2026 C4 368 of 383

09/08/2026 C4 369 of 383

09/08/2026 C4 370 of 383

09/08/2026 C4 371 of 383

09/08/2026 C4 372 of 383

09/08/2026 C4 373 of 383

09/08/2026 C4 374 of 383

09/08/2026 C4 375 of 383

09/08/2026 C4 376 of 383

09/08/2026 C4 377 of 383

09/08/2026 C4 378 of 383

09/08/2026 C4 379 of 383

09/08/2026 C4 380 of 383

09/08/2026 C4 381 of 383

Bid Schedule

PRICE TABLES
Line Item Description Quantity Unit of Measure Unit Cost Total 1 Mobilization &
Demobilization (5%
maximum of Total Base
Bid)
1 LS $46,000.00 $46,000.00
2 Unforeseen Field
Conditions (stipulated
amount)
1 EA $50,000.00 $50,000.00
3 Record Drawing (“As-
Built”) Plans (stipulated
amount)
1 EA $2,000.00 $2,000.00
4 Move Concrete Tables,
Trashcans, and Other
Items on Deck
1 LS $3,795.00 $3,795.00
5 Salvage Lifeguard Tower 1 EA $1,495.00 $1,495.00
6 Salvage Handrail in Pools 11 EA $241.50 $2,656.50
7 Salvage Grab Rail in
Competition Pool
4 EA $333.50 $1,334.00
8 Salvage Handrail Around
deck
1 LS $632.50 $632.50
9 Demo Concrete Deck 1 LS $109,250.00 $109,250.00
10 Demo Metal Umbrellas 2 EA $414.00 $828.00
11 Replace Pool Deck Tile 1 LS $88,550.00 $88,550.00
12 Replace Backstroke Flag
Stanchions
4 EA $2,242.50 $8,970.00
13 Replace Diving Block
Anchors
8 EA $2,070.00 $16,560.00
14 Replace Fence Sleeves
Between Competition
Pool and Lazy River
21 EA $1,150.00 $24,150.00
15 Replace Fence Sleeves
Around Receiving Pool
42 EA $1,150.00 $48,300.00
16 Replace Water Polo cage
stanchions
4 EA $2,645.00 $10,580.00
17 Provide and Install New
Handicap Lift
1 EA $12,650.00 $12,650.00
18 Install Trench Drain 411 LF $89.70 $36,866.70
19 Install 12”x12” Trench
Drain Clean Outs
6 EA $1,420.25 $8,521.50
20 Replace Deck Storm Drain
Inlets in Concrete
Replacement Area
10 EA $1,063.75 $10,637.50
09/08/2026 C4 382 of 383

21 Replace Deck Storm Drain
Inlets in Existing Concrete
Area
17 EA $879.75 $14,955.75
22 Provide and Install New
Drain and Connect to
Drain System
1 EA $4,830.00 $4,830.00
23 Replace Competition Pool
Piping Clean Out
5 EA $1,035.00 $5,175.00
24 Provide and Install Class II
Base
50 YD $86.25 $4,312.50
25 Provide and Install 30”
Diameter FRP Manhole for
Surge Chamber
1 EA $2,990.00 $2,990.00
26 Replace Surge Chamber
Top
190 SF $51.75 $9,832.50
27 Provide and Install
36”x24” FRP Manhole
1 EA $3,220.00 $3,220.00
28 Replace Stairs 1 EA $4,830.00 $4,830.00
29 Replace Deck 13915 SF $34.50 $480,067.50
30 Replace Competition Pool
Cantilevered Deck
1650 SF $48.30 $79,695.00
31 Replace Flow Rider Deck 160 SF $48.30 $7,728.00
32 Replace Swale 200 LF $64.40 $12,880.00
33 Replace Wall Caps 270 LF $66.70 $18,009.00
34 Paint white 6” white stripe
around pool decks
920 LF $7.82 $7,194.40
35S Replace Handrail 170 LF $402.50 $68,425.00
Total $1,207,921.35
09/08/2026 C4 383 of 383