ACTION:
____________________________
Clerk/Secretary
Department: Public Works Item No: C10
Prepared by: Kristi Geno, Management Assistant Meeting Date: October 13, 2026 Approved by:

Chris Arce, Public Works Director
John Conley, City Manager Agenda Location: Consent Calendar SUBJECT: AGREEMENT WITH MUSCO SPORTS LIGHTING, LLC FOR THE BRENGLE TERRACE

PARK, THIBODO PARK, AND VISTA SPORTS PARK LED LIGHTING UPGRADE

PROJECT
RECOMMENDATION: Adopt City Council Resolution No. 2026- , approving the agreement with Musco Sports Lighting, LLC for the Brengle Terrace Park, Thibodo Park, and Vista Sports Park LED Lighting Upgrade Project.

CORRELATION TO CITY COUNCIL GOALS: Parks and Recreation.

PRIOR ACTION: On May 26, 2026, adopted City Council Resolution No. 2026-79, approving the Operating Budget for Fiscal Years 2025/26 and 2026/27, and Amending the Capital Project Budget for Fiscal Years 2024/25 and 2025/26 (Vote: 5-0).

On November 12, 2025, adopted City Council Resolution No. 2025-191, amending the Operating Budget for Fiscal Years 2025/26 and 2026/27, and amending the Capital Project Budget for Fiscal Years 2024/25 and 2025/26 (Vote: 5-0).

STATEMENT ON THE SUBJECT: The City of Vista is transitioning to LED lighting to improve lighting performance, increase energy efficiency, and reduce maintenance requirements. As part of this effort, staff recommends upgrading the existing lighting systems for the tennis, pickleball, and basketball courts at Brengle Terrace Park and Thibodo Park, as well as the sports field lighting at Vista Sports Park to LED technology. The proposed project would retrofit the existing lighting equipment with LED technology and integrate the upgraded fixtures with the existing lighting infrastructure. The LED system is designed to provide improved overall lighting performance and includes a 10-year materials and labor warranty.

The City of Vista utilizes proprietary lighting systems and components manufactured by Musco Sports Lighting, LLC (Musco) for various sports facilities throughout City parks. The proposed upgrades require compatible Musco equipment designed to integrate with the existing systems. Therefore, staff recommend forgoing the normal bidding procurement to enter an agreement with Musco Sports Lighting, LLC for Brengle Terrace Park, Thibodo Park, and Vista Sports Park LED lighting upgrade project under the City’s Municipal Code Section 3.08.150 (N) when the commodity or service can be obtained from only one vendor.

FISCAL IMPACT: The cost of the project is $742,000. Sufficient funding is available in Fiscal Year 2026/27, in Capital Assets accounts 6020155.562000.PL27A and 6020155.562000.NA27A.

AGENDA
REPORT

CITY COUNCIL

COMMUNITY DEVELOPMENT COMMISSION

SUCCESSOR AGENCY

BUENA SANITATION DISTRICT

JOINT POWERS FINANCING AUTHORITY
Approved above recommendation, adopted City Council Resolution No. 2026-174. Vote: 5-0

ACTION:
____________________________
Clerk/Secretary
Department: Public Works Item No: C10
Prepared by: Kristi Geno, Management Assistant Meeting Date: October 13, 2026 Approved by:

Chris Arce, Public Works Director
John Conley, City Manager Agenda Location: Consent Calendar SUBJECT: AGREEMENT WITH MUSCO SPORTS LIGHTING, LLC FOR THE BRENGLE TERRACE

PARK, THIBODO PARK, AND VISTA SPORTS PARK LED LIGHTING UPGRADE

PROJECT
RECOMMENDATION: Adopt City Council Resolution No. 2026- , approving the agreement with Musco Sports Lighting, LLC for the Brengle Terrace Park, Thibodo Park, and Vista Sports Park LED Lighting Upgrade Project.

CORRELATION TO CITY COUNCIL GOALS: Parks and Recreation.

PRIOR ACTION: On May 26, 2026, adopted City Council Resolution No. 2026-79, approving the Operating Budget for Fiscal Years 2025/26 and 2026/27, and Amending the Capital Project Budget for Fiscal Years 2024/25 and 2025/26 (Vote: 5-0).

On November 12, 2025, adopted City Council Resolution No. 2025-191, amending the Operating Budget for Fiscal Years 2025/26 and 2026/27, and amending the Capital Project Budget for Fiscal Years 2024/25 and 2025/26 (Vote: 5-0).

STATEMENT ON THE SUBJECT: The City of Vista is transitioning to LED lighting to improve lighting performance, increase energy efficiency, and reduce maintenance requirements. As part of this effort, staff recommends upgrading the existing lighting systems for the tennis, pickleball, and basketball courts at Brengle Terrace Park and Thibodo Park, as well as the sports field lighting at Vista Sports Park to LED technology. The proposed project would retrofit the existing lighting equipment with LED technology and integrate the upgraded fixtures with the existing lighting infrastructure. The LED system is designed to provide improved overall lighting performance and includes a 10-year materials and labor warranty.

The City of Vista utilizes proprietary lighting systems and components manufactured by Musco Sports Lighting, LLC (Musco) for various sports facilities throughout City parks. The proposed upgrades require compatible Musco equipment designed to integrate with the existing systems. Therefore, staff recommend forgoing the normal bidding procurement to enter an agreement with Musco Sports Lighting, LLC for Brengle Terrace Park, Thibodo Park, and Vista Sports Park LED lighting upgrade project under the City’s Municipal Code Section 3.08.150 (N) when the commodity or service can be obtained from only one vendor.

FISCAL IMPACT: The cost of the project is $742,000. Sufficient funding is available in Fiscal Year 2026/27, in Capital Assets accounts 6020155.562000.PL27A and 6020155.562000.NA27A.

AGENDA
REPORT

CITY COUNCIL

COMMUNITY DEVELOPMENT COMMISSION

SUCCESSOR AGENCY

BUENA SANITATION DISTRICT

JOINT POWERS FINANCING AUTHORITY
10/13/2026 C10 1 of 74

MEETING DATE: October 13, 2026 PAGE 2
SUBJECT: AGREEMENT WITH MUSCO SPORTS LIGHTING, LLC FOR THE BRENGLE TERRACE

PARK, THIBODO PARK, AND VISTA SPORTS PARK LED LIGHTING UPGRADE

PROJECT
EXHIBITS:

1.City Council Resolution No. 2026- , approving the Agreement with Musco Sports Lighting, LLC for the Brengle Terrace Park, Thibodo Park, and Vista Sports Park LED Lighting Upgrade Project

2.Agreement with Musco Sports Lighting, LLC

3.Memo – Musco Sports Lighting, LLC
10/13/2026 C10 2 of 74

RESOLUTION NO. 2026-

A RESOLUTION OF THE CITY COUNCIL OF THE CHARTERED CITY OF

VISTA, CALIFORNIA, APPROVING THE AGREEMENT WITH MUSCO

SPORTS LIGHTING, LLC FOR THE BRENGLE TERRACE PARK, THIBODO

PARK AND VISTA SPORTS PARK LED LIGHTING UPGRADE PROJECT The City Council of the City of Vista does resolve as follows:

1. Findings. The City Council hereby finds and declares the following:

A. In the Citywide Facilities Master Program Update on April 28, 2026, staff proposed upgrading to LED Lighting for the tennis, pickleball, and basketball courts located at Brengle Terrace Park and Thibodo Park, as well as the Vista Sports Park ballfields.

B. Musco Sports Lighting, LLC’s proprietary lighting system and components have been installed and maintained at Brengle Terrace Park, Thibodo Park, and the Vista Sports Park.

C. Staff recommends entering into an agreement with Musco Sports Lighting, LLC for the LED Lighting Upgrades.

2. Action.

A. The agreement between the City of Vista and Musco Sports Lighting, LLC for Brengle Terrace Park, Thibodo Park, and Vista Sports Park LED Lighting Upgrade Services is approved and the Mayor is authorized to execute the agreement.

3. Adoption. PASSED AND ADOPTED at a meeting of the City Council of the City of Vista held on October 13, 2026, by the following vote:

AYES:

NOES:

ABSTAIN:

APPROVED AS TO FORM:

WALTER CHUNG, CITY ATTORNEY
By:

APPROVED
Walter C. Chung
20261001103640
JOHN B. FRANKLIN, MAYOR
ATTEST:

KATHY VALDEZ, CITY CLERK
By:
10/13/2026 C10 3 of 74
EXHIBIT 1

CONSTRUCTION CONTRACT (NB-PW) [52253-1]
1 of 9

MUSCO SPORTS LIGHTING, LLC
00052253 1

CONSTRUCTION CONTRACT FOR

BRENGLE TERRACE PARK, THIBODO PARK, AND VISTA SPORTS PARK

LED LIGHTING UPGRADE PROJECT
THIS CONTRACT is entered into by and between the Parties as of ______________________ (“Contract Date”).

1.0 THE “PARTIES”:

The “City”:

CITY OF VISTA, a chartered municipal
corporation
200 Civic Center Drive
Vista, CA 92084
Working Contact: Keith Gardner
Billing Contract: Kassandra Santacruz
The “Contractor”:

MUSCO SPORTS LIGHTING, LLC, a limited
liability company – out of state
211 2nd Avenue West
Oskaloosa, IA 52577
Contact: Karin Anderson

2.0 BASIC TERMS

2.1 City is authorized under Chapter 3.08 the Vista Municipal Code to enter into an informally-bid contract with Contractor.

2.2 Contractor has submitted to City a proposal dated August 28, 2026 (“Exhibit A”).

2.3 The “Work” to be performed by Contractor is set forth in Exhibit A.

2.4 The “Required License” for the Work is C10 - Electrical.

2.5 Contractor, a contractor holding the Required License, desires to enter into this “Contract” with the City for the Work.

2.6 The “Contract Price” for the Work is $742,000.

3.0 TIME FOR COMPLETION AND COMMENCEMENT OF SERVICES

3.1 This Contract shall take effect as of the Contract Date.

3.2 The Work shall be completed no later than 60 calendar days from the Notice to Proceed (“Contract Time”).

3.3 Time is of the essence in this Contract. “Liquidated Damages” for failure to complete the Contract within the Contract Time are $150 per calendar day. The Liquidated Damages compensate for the loss to City resulting from Contractor’s failure to complete the Work with the Contract Time and for the value of the operation of the Work following completion.

It is expressly understood and agreed that this amount is a reasonable amount and is established in lieu of damages that are incapable of calculation at the inception hereof; and this amount is not to be considered in the nature of a penalty. 10/13/2026 C10 4 of 74
EXHIBIT 2

CONSTRUCTION CONTRACT (NB-PW) [52253-1] 2 of 9 MUSCO SPORTS LIGHTING, LLC 00052253 1

4.0 EXECUTION OF ADDITIONAL DOCUMENTS
As a condition precedent to the effectiveness of this Contract, the Contractor shall execute and deliver to City the following checked document packages:

1. Contractor’s Forms

2. Labor Law Compliance Form, Exhibit D (This Contract requires the payment of prevailing wages.)

5.0 SCOPE
Contractor shall perform all Work including, but not limited to, the furnishing of all tools, equipment, materials, supplies and manufactured articles, and for furnishing all transportation, services, including fuel, power and water, essential communications, and the performance of all labor, work or other operations, as may be required from time to time upon the issuance of a Work Order for the fulfillment of each specific task to be performed under the Contract (“Project”), in strict accordance with the Contractor's proposal (“Exhibit A”). The Work shall be complete, and all work, material and services not expressly called for in the Proposal which may be necessary for complete and proper construction to carry out the Contract in good faith, shall be performed, furnished and installed by the Contractor at no increase in cost to the City. In the event of a conflict between the provisions of Exhibit A and this Contract text, the provisions of this Contract text shall control.

6.0 COMPENSATION

6.1 City shall pay Contractor the Contract Price for the successful performance of the Work within the Contract Time.

6.2 An invoice for payment shall be submitted in a form satisfactory to the City. At a minimum, the invoice shall include: the purchase order number, the work order number, a description of the work performed, and a total amount.

6.3 Changes in, additions to, or deductions from the Work, including increases or decreases in the quantity of any item or portion of the Work, shall be set forth in a written change order executed by the City and by the Contractor which shall specify:

6.3.1 The changes, additions, and deductions to be made.

6.3.2 The increase or decrease in compensation due the Contractor, if any.

6.3.3 Adjustment in the time of completion, if any.

6.4 Adjustments in the compensation due the Contractor shall be determined by mutually agreeable lump-sum. If requested by the City's Representative, the Contractor shall furnish an itemized breakdown of the quantities and prices used in computing proposed lump- sum.

6.5 Payment of the undisputed final Contract amount is contingent upon the Contractor furnishing the City with a release of all claims against the City arising by virtue of the 10/13/2026 C10 5 of 74

CONSTRUCTION CONTRACT (NB-PW) [52253-1] 3 of 9 MUSCO SPORTS LIGHTING, LLC 00052253 1
Contract related to that amount. Disputed Contract claims in stated amounts may be specifically excluded by the Contractor from the operation of the release.

6.6 In addition to the amount which the City may retain under the above article on progress payments, the City may withhold a sufficient amount or amounts from any payment otherwise due to the Contractor as in its judgment may be necessary to cover:

6.6.1 Payments which may be past due and payable for just claims against the Contractor or any subcontractors for labor or materials furnished in or about the performance of the Work under this Contract.

6.6.2 Estimated or actual costs for correcting defective work not remedied.

6.6.3 Amounts claimed by the City as forfeiture due to delay or other offsets.

6.6.4 Estimated or actual costs for emergency work by City forces, which is a result of the Contractor's neglect or actions.

6.7 The City may apply such withheld amounts or amounts to the payment of such claims at its discretion. In so doing, the City shall be deemed the agent of the Contractor, and any payments so made by the City shall be considered as a payment made under the Contract by the City to the Contractor, and the City shall not be liable to the Contractor for such payment made in good faith. Such payments may be made without prior judicial determination of the claim or claims. The City will render to the Contractor a proper account of such funds disbursed in behalf of the Contractor.

6.8 Contract Ceiling Price

6.8.1 In no event shall City be liable for paying more than the Contract Ceiling Price [annually] for Contractor's services rendered under this Contract.

6.8.2 If it becomes foreseeable that Contractor will need to perform services such that the cumulative total of costs to the City will exceed the maximum permitted by this Agreement, any such cost overrun will be handled pursuant to the change order procedure in Chapter 3.08. City and Contractor recognize that the City lacks authority to exceed the cost ceiling without the express authorization of the City Council. If the maximum cost to the City for this Agreement is exceeded unexpectedly, payment shall be made as mutually agreeable and disputes shall be handled pursuant to this Agreement, but work shall cease as soon as is reasonably feasible once the cost ceiling plus allowable change orders, if any, is exceeded.

7.0 CONTRACT DOCUMENTS
The Contract comprises the following documents including all additions, deletions, modifications and appendices and all addenda setting forth any modifications or interpretations of any these documents: Documents required under Section 4, Exhibits A–D, and the Standard Specifications (defined below).

10/13/2026 C10 6 of 74

CONSTRUCTION CONTRACT (NB-PW) [52253-1] 4 of 9 MUSCO SPORTS LIGHTING, LLC 00052253 1

8.0 STANDARD SPECIFICATIONS AND STANDARD PLANS

8.1 Except as otherwise provided, whenever reference is made to “Standard Specifications”, it shall mean:

Standard Specifications for Public Works Construction, most current edition and supplement, as last amended, with Regional Supplements, written and promulgated by Southern California Chapter, American Public Works Association, and Southern California District, Associated General Contractors of California, Joint Cooperative Committee (“Greenbook”) and the City of Vista Special Provisions to the Greenbook.

8.2 Except as otherwise provided, whenever reference is made to “Standard Plans”, it shall mean:

San Diego Area Regional Standard Drawings, and City of Vista Standard Drawings, latest edition, unless otherwise noted.

9.0 SUPPLEMENTARY DEFINITIONS
In addition to or in lieu of the terms and definitions specified in Section 1-2 of the Standard Specifications, wherever the following terms and definitions are used, the intent and meaning shall be as follows:

Board: The City Council of the City of Vista.

City: The City of Vista.

Drawings or Plans: All drawings, plans, maps, profiles and diagrams delineating the work on the Work.

10.0 ADDITIONAL DRAWINGS
When appropriate, the Contractor will be furnished sufficient sets of drawings to properly complete the Work. There will be no charge for such drawings and specifications.

11.0 INTERPRETATION OF DRAWINGS AND SPECIFICATIONS

11.1 Figured dimensions on drawings shall govern, but work not dimensioned shall be as directed. Work not particularly shown or specified shall be the same as similar parts that are shown or specified. Large scale details shall take precedence over smaller scale drawings as to shape and details of construction. Specifications shall govern as to materials, workmanship and installation procedures. Drawings and specifications are intended to be fully cooperative and to agree. The specification calling for the higher quality material or workmanship shall prevail. In the event of any discrepancy between any drawings and the figures thereon, the figures shall be taken as correct. In the event of any doubt or question arising respecting the true meaning of the specifications, reference shall be made to the City Engineer whose decision thereon shall be final.

11.2 The Standard Specifications shall apply for materials and methods of construction not specifically or otherwise shown or specified in the Project drawings and specifications.
10/13/2026 C10 7 of 74

CONSTRUCTION CONTRACT (NB-PW) [52253-1] 5 of 9 MUSCO SPORTS LIGHTING, LLC 00052253 1

12.0 CONTROL OF SERVICES

12.1 Representatives. Each Party shall appoint a representative who shall have the authority to represent and act for that Party (“Representative”). Any written or verbal directions or requests of the City's Representative delivered to the Contractor’s Representative shall have the same force and effect as if delivered to the Contractor. The Contractor's Representative shall have the authority to sign any change order, coordinate the work of all subcontractors and make other decisions pertaining to the Contract.

12.2 Superintendence. The Contractor shall designate in writing a competent supervisor for the Work who must be personally present on the premises where the work on the Work is performed. When work is not in progress and during periods when the work is suspended, arrangements acceptable to the City's Representative shall be made for any emergency work that may be required.

12.3 Advance Notification. It shall be the Contractor's responsibility to determine and notify those agencies requiring advance notification for inspection or other purposes before beginning construction in any area of concern to that agency. A minimum of 48 hours’ advance notice shall be given to the various agencies before beginning construction in the area unless specific advance times and requirements are stated in the Special Provisions or required by the agency. The names and telephone numbers for the respective agencies are listed on the drawings, in the Special Provisions, in the Work Order, or will be otherwise provided as applicable.

12.4 Inspection. The City's Representative shall at all times have access to the work during construction, and shall be furnished with every reasonable facility for ascertaining full knowledge respecting the progress, workmanship and character of materials and equipment used and employed in the work. Whenever the Contractor varies the period during which work is carried on each day, it shall give due notice to the City's Representative so that inspection may be provided. Any work done in the absence of the City's Representative will be subject to rejection. All installations which are to be backfilled or otherwise covered shall be inspected by the City's Representative prior to backfilling or covering, and the Contractor shall give due notice in advance of backfilling or covering to the City's Representative so that inspection may be provided. The inspection of the work shall not relieve the Contractor of any of its obligations to fulfill the Contract as prescribed. Defective work shall be made good, and unsuitable materials and equipment may be rejected notwithstanding the fact that such defective work and unsuitable materials and equipment have been previously inspected by the City's Representative or that payment therefore has been included in an estimate for payment.

12.5 Preservation of Property. The Contractor shall exercise due care to avoid injury to existing improvements or facilities, utility facilities, and adjacent property. All buildings and structures and any other improvements or facilities within or adjacent to the work shall be protected from injury or damage, and the Contractor shall provide and install suitable safeguards to protect such objects from injury or damage. If such objects are injured or damaged by reason of the Contractor's operation, they shall be replaced or restored at the Contractor's expense to a condition as good as when the Contractor entered upon the work or as good as required by the drawings and specifications if any such objects are a part of the work being performed.

10/13/2026 C10 8 of 74

CONSTRUCTION CONTRACT (NB-PW) [52253-1] 6 of 9 MUSCO SPORTS LIGHTING, LLC 00052253 1

12.6 Emergency. In an emergency affecting the safety of life or property, including adjoining property, the Contractor, without special instructions or authorizations, is authorized to act at its discretion to prevent such threatened loss or injury, and it shall so act as though instructed to do so by the City.

13.0 EXISTING UTILITIES AND IMPROVEMENTS

13.1 If the Contractor while performing the Contract discovers utility facilities not identified by the City in the Contract drawings or specifications, it shall immediately notify the City in writing.

13.2 The fact that existing utilities and improvements, either above or below the ground surface, are not shown in any drawings shall not relieve the Contractor of liability for complete and careful protection of said improvements from damage as specified herein.

13.3 All repairs to damaged utilities and improvements shall be inspected and approved by an authorized representative of the City before being concealed by backfill or other work.

14.0 UTILITY SERVICE INTERRUPTION
In all cases of alteration or relocation of service connections, the Contractor shall notify the City a minimum of four hours prior to said alteration or relocation, and service connection shall be returned to service in an amount of time not to exceed four hours.

15.0 MAINTENANCE AND GUARANTY

15.1 The Contractor hereby guarantees that all work performed by it under the Contract will fully meet all requirements of the Contract as to quality of workmanship and materials furnished by it. The Contractor hereby agrees to make at its own expense any repairs or replacements made necessary by defects in materials or workmanship supplied by it that become evident within one year after the date of final payment, and to restore to full compliance, with the requirements of these specifications part of the Work which during the one- year period is found to be deficient with respect to any provisions of the specifications.

15.2 The Contractor shall make all repairs and replacements promptly upon the receipt of written order from the City. If the Contractor fails to make such repairs and replacements promptly, the City may do the work and the Contractor and its surety shall be liable to the City for the cost thereof.

16.0 INDEMNIFICATION & WAIVER OF SUBROGATION

16.1 Contractor shall defend, indemnify and hold City and its officers, officials, employees, and volunteers (“Indemnitees”) harmless against any and all liability, loss, damage, fine, penalty, expense, claim or cost (including without limitation costs and fees of litigation) of every nature (collectively, “Liability”) arising out of or in connection with this Agreement or its performance except: (1) Liability caused by City's sole negligence or willful misconduct; or (2) for Liability caused by City's active negligence, in which case the indemnity received by City shall be reduced by the amount: (i) that City's active negligence contributed to the Liability on a comparative basis; or (ii) such other amount as may be required by law (“Duty of Indemnification”). This Duty of Indemnification is effective without reference to the 10/13/2026 C10 9 of 74

CONSTRUCTION CONTRACT (NB-PW) [52253-1] 7 of 9 MUSCO SPORTS LIGHTING, LLC 00052253 1
existence or applicability of any insurance coverages which may have been required under this Agreement or any additional insured endorsements which may extend to Indemnitees.

16.2 Contractor, on behalf of itself and all parties claiming under or through it, hereby waives all rights of subrogation and contribution against the Indemnitees, while acting within the scope of their duties, from all claims, losses and liabilities arising out of or incident to activities or operations performed by or on behalf of the Contractor regardless of any prior, concurrent, or subsequent active or passive negligence by the Indemnitees.

17.0 INSURANCE AND BONDS
Contractor shall comply with the insurance and bond provisions set forth in Exhibit C.

18.0 SAFETY

18.1 In accordance with generally accepted construction practices, the Contractor shall be solely and completely responsible for conditions of the jobsite, including safety of all persons and property during performance of the Work, and the Contractor shall fully comply with all OSHA, State and Federal laws, rules, regulations and orders relating to safety of the public and workers.

18.2 It is the Contractor's responsibility to acquaint itself with and abide by these regulations during all phases of construction. The City will not be responsible for ensuring the Contractor's compliance with these regulations. The Contractor’s duty of indemnification shall apply to any Liability caused by its failure to abide by these regulations.

18.3 The Contractor shall include any and all costs associated with compliance with these safety requirements in the appropriate bid items of Work to be performed.

19.0 PERMITS (CITY AND OTHER AGENCIES)

19.1 After execution of the Contract and prior to beginning work, the Contractor and all subcontractors shall execute a no fee construction permit at the City. A permit will be issued by the Engineering Inspector assigned to the Project for the Contractor and all subcontractors.

19.2 The permittees shall first submit the following documents to the City's Representative or its designee with proof that the policies/licenses are current:

19.2.1 Contractor's License of appropriate classification.

19.2.2 City Business License. A fee will be charged for any new Business Licenses.

19.2.3 General Liability Insurance Certificate as required by Exhibit C.

19.2.4 Worker's Compensation Insurance Certificate as required by Exhibit C.

19.3 If any subcontractor does not have the amount of liability insurance required in these specifications, the Contractor must produce evidence satisfactory to the City’s Risk Manager that the subcontractor's work is covered by the Contractor's liability insurance policy. 10/13/2026 C10 10 of 74

CONSTRUCTION CONTRACT (NB-PW) [52253-1] 8 of 9 MUSCO SPORTS LIGHTING, LLC 00052253 1

19.4 Agency permits, other than those issued by the City, will generally not be required unless specifically noted. If for some unknown reason the Contractor is required to obtain a permit, the City will compensate the Contractor for its actual cost plus a 10% markup.

20.0 SERVICE OF NOTICE

20.1 Any notice, which either Party may desire to give to the other Party, must be in writing and may be given by personal delivery to the Party’s Representative or by overnight courier service to the Party’s address set forth in Section 1.0. Notice may also be given by mailing it by registered or certified mail, return receipt requested, to the other Party at the address set forth in Section 1.0. Any notice given by mail will be deemed given 48 hours after such notice is deposited in the United States mail, addressed as provided with postage fully prepaid.

20.2 A Party may change its address by giving notice as provided above, and the changed address shall thereafter be deemed to be the address set forth in Section 1.0.

21.0 PUBLIC WORKS CONTRACTS: ASSIGNMENT TO AWARDING BODY In accordance with Section 4551 of the Government Code, the Contractor and subcontractors shall conform to the following requirements. In entering into a public works contract or a subcontract to supply goods, services or materials pursuant to a public works contract, the contractor or subcontractor offers and agrees to assign to the awarding body all rights, title and interest in and to all causes of action it may have under Section 4 of the Clayton Act (15 U.S.C. Sec. 15) or arising from purchases of goods, services or materials pursuant to the public works contract of the subcontract. This assignment shall be made and become effective at the time the awarding body tenders final payment to the contractor, without further acknowledgment by the Parties.

22.0 RESOLUTION OF CONTRACT CLAIMS
The provisions of Article 1.5, Chapter 1, Part 3 of Division 2, of the Public Contract Code apply to this Contract. These provisions set forth a procedure for the resolution of disputed construction claims arising from this Contract. These provisions establish procedures for submitting claims and set minimum time limits for responding to such claims. Following a response, if a claim remains in dispute, a meet and confer conference between the claimant and the local agency may be demanded by the claimant. If the dispute remains unresolved following the meet and confer conference, and the claimant proceeds to file a civil action seeking to obtain enforcement and judgment on the claim, the dispute may be submitted to non-binding mediation and, if it remains unresolved, to judicial arbitration.

23.0 SPECIAL PROVISIONS
This Contract is subject to, and Contractor shall comply with, the special provisions referenced in Exhibit E, if any.

24.0 EXHIBITS
All documents referenced as exhibits in this Contract, or referenced in an exhibit to this Contract, are incorporated herein.
10/13/2026 C10 11 of 74

CONSTRUCTION CONTRACT (NB-PW) [52253-1] 9 of 9 MUSCO SPORTS LIGHTING, LLC 00052253 1

25.0 APPLICABLE LAW, VENUE
This Contract shall be construed and enforced under the laws of the State of California.

If any action is commenced by any Party to this Agreement, such action shall be filed in a court of competent jurisdiction within the County of San Diego, California.

26.0 MODIFICATIONS
This Contract contains the entire agreement, between the Parties and supersedes all prior negotiations, discussions, obligations and rights of the Parties in respect of each other regarding the subject matter of this Contract. There is no other written or oral understanding between the Parties. No modification, amendment or alteration of this Contract shall be valid unless it is in writing and signed by all Parties.

27.0 EXECUTION
IN WITNESS WHEREOF; the Parties hereto have executed this Contract as of the Contract Date.

“City”

CITY OF VISTA, a chartered municipal
corporation

By:

JOHN FRANKLIN, MAYOR

ATTEST:

KATHY VALDEZ, CITY CLERK

By:

APPROVED AS TO FORM:

WALTER CHUNG, CITY ATTORNEY

By:

RISK MANAGEMENT REVIEW:

ANALISA HOLBROOK, RISK MANAGER

By:

APPROVED
Amanda L. Guy
20260908151320

“Contractor”

MUSCO SPORTS LIGHTING, LLC, a
limited liability company – out of state

By:

Name/Title

By:

Name/Title

10/13/2026 C10 12 of 74

00052253 1 Exhibit A

EXHIBIT A
CONTRACTOR’S PROPOSAL

10/13/2026 C10 13 of 74

2016, 2025 Musco Sports Lighting, LLC • M-2168-enUS-20

1 of 6
QUOTE
Date: August 28, 2026 Project: Brengle Terrace Park Retrofit To: City of Vista Vista, CA
Musco Project Number: 209881

Sourcewell
Master Project: 199030, Contract Number: 041123-MSL, Expiration: 06/16/2027 Category: Sports lighting with related supplies and services

All purchase orders should note the following:

Sourcewell Purchase – Contract Number: 041123-MSL
Sourcewell Member Number: 28780

Quotation Price – Materials Delivered to Job Site and Installation

Basketball and Tennis:

Musco Materials: $106,900.

Installation: $ 48,900.

Estimated Sales tax: $ 8,795.

Project Total: $164,595.

Sales tax is estimate and based on 8.25% rate. Bonding is not included. Labor, installation, and unloading of the equipment are included. Quote is confidential. Pricing and lead times are effective for 120 days only.

CA Public Works Contractor Number: 1000004278, Electrical Contractor (C-10 License) Number: 797757

Quick-Fit® Solution with Total Light Control – TLC for LED™ Technology System Description:

Existing System Components
 Pre-cast concrete bases
 Galvanized steel poles
New System Components
 Factory-aimed QuickFitTM luminaires
 Pole length factory assembled wire harnesses
 Factory wired and tested remote electrical component enclosures  UL listed as a complete system
Installation - QuickFitTM
 For installation the following will be provided: demo and disposal of existing fixtures and parts, labor, lift and equipment to install all LED fixtures and components. Does not include electrical conduit, wire or service, and assumes re-use of electrical on-site  Please see full Installation Scope of Work below
On Field Performance
 Guaranteed light levels to match existing
 Existing controls to be utilized for remote scheduling  Reduction of glare compared to the existing system
Control Systems and Services
 Utilizes existing Musco Control-Link® system on-site - to provide remote on/off control with 24/7 customer support
10/13/2026 C10 14 of 74

2016, 2025 Musco Sports Lighting, LLC • M-2168-enUS-20

2 of 6
QUOTE
Operation and Warranty Services
 10 year warranty that covers materials and onsite labor, eliminating 100% of your maintenance costs for 10 years
 Warranty starts the date of shipment

Payment Terms
Final payment terms to be coordinated with Musco’s credit department.

Please email a copy of the Purchase Order to:

Musco Sports Lighting, LLC
Attn: Karin Anderson
Email: [email protected]

All Purchase orders should note the following:

Sourcewell Purchase – Contract Number: 041123-MSL
Sourcewell Member Number: 28780

Delivery Timing
8 - 10 weeks for delivery of materials to the job site from the time of order, submittal approval, and confirmation of order details including voltage, phase, and pole/luminaire locations. Installation is expected to take 3-5 business days.

Notes
Quote is based on following conditions:
 Shipment of entire project together to one location.
 Structural Pole Load check is included, and is currently in progress  Structural code and wind speed = 2025 CBC, 95 mi/h, Exposure C, Importance Factor 1.0.  Installation is included- per scope of work below

Thank you for considering Musco for your lighting needs. Please contact me with any questions or if you need additional details.

Karin Anderson
Field Sales Representative
Musco Sports Lighting, LLC
Phone: 858-232-1620
E-mail: [email protected]

10/13/2026 C10 15 of 74

2016, 2025 Musco Sports Lighting, LLC • M-2168-enUS-20

3 of 6
QUOTE
Brengle Terrace Park
Vista, CA
QuickFit Retrofit Scope of Work

Customer Responsibilities:

1. Complete access to the site for construction using standard 2-wheel drive rubber tire equipment.

2. Locate existing underground utilities not covered by your local utilities (i.e. water lines, electrical lines, irrigation systems, and sprinkler heads). Musco or Subcontractor are not be responsible for repairs to unmarked utilities.

3. Locate and mark field reference points per Musco supplied layout (i.e. home plate, center of FB field).

4. Ensure usability of existing underground wiring.

5. Pay any necessary power company fees and requirements.

6. Pay all permitting fees.

Musco Responsibilities:

1. Provide required fixtures, electrical enclosures, mounts, hardware, wire harnesses, and control cabinets.

2. Provide fixture layout and aiming diagram.

3. Provide Contract Management as required.

4. Assist our installing subcontractor and ensure all project responsibilities are satisfied.

Subcontractor Responsibilities
General:

1. Obtain any required permitting.

2. Contact the facility owner/manager to confirm the existing private underground utilities and irrigation systems have been located and are clearly marked to avoid damage from construction equipment. Notify owner and Musco regarding damage which occurred to unmarked utilities.

3. Provide labor, equipment, and materials to offload equipment at jobsite per scheduled delivery.

4. Provide storage containers for material, (including electrical components enclosures), as needed.

5. Provide necessary waste disposal and daily cleanup.

6. Provide adequate security to protect Musco delivered products from theft, vandalism, or damage during the installation.

7. Keep all heavy equipment off playing fields when possible. Repair damage to grounds which exceeds that which would be expected. Indentations caused by heavy equipment traveling over dry ground would be an example of expected damage. Ruts and sod damage caused by equipment traveling over wet grounds would be an example of damage requiring repair.

8. Provide startup and aiming as required to provide complete and operating sports lighting system.

9. Installation to commence upon delivery and proceed without interruption until complete. Musco to be immediately notified of any breaks in schedule or delays.

10. Complete and submit Musco provided closeout checklist including required pictures. 10/13/2026 C10 16 of 74

2016, 2025 Musco Sports Lighting, LLC • M-2168-enUS-20

4 of 6
QUOTE
Demolition:

1. Remove and dispose of the existing fixtures, and electrical enclosures, parts. This will include the recycling of lamps, aluminum reflectors, ballast, and steel, as necessary.

2. Leave existing ground wires and power feed in place for connection to new lighting equipment.

Retrofit Musco Equipment to Existing Poles:

1. Provide labor, materials, and equipment to assemble and install Musco QuickFit equipment on existing poles and terminate grounding and power feed. Power feed may need to be reworked to adapt to the new Musco equipment.

2. Ensure grounding components meet minimum standards required by NEC and NFPA780.

3. Ensure all Musco components are bonded to both equipment and lightning grounds. No upward sweeps allowed for lightning down conductor or bonding jumper(s). See installation instructions for further information.

4. Test ground resistance with 3-point ground resistance test, using instructions provided. Confirm 25 ohms or less for each pole. Install additional ground rods or create grounding grid until resistance of 25 ohms or less is achieved. Record all results on form provided and submit readings to Musco.

Electrical:

1. Provide materials, and equipment to reuse existing electrical service panels as required.

2. Provide materials, and equipment to reuse existing electrical wiring as permitted.

3. Provide materials, and equipment to reuse existing Control Link cabinet.

4. Complete required insulation resistance tests on all current-carrying conductors per ANSI/NETA ATS-2021.
a. Use the instructions and forms provided by Musco to provide test results to your Musco contact. Note conduits must be full of water prior to testing. b. Any new conductors with resistance values less than (<) 100 MΩ - phase to ground - must be repaired or replaced to meet the standard.
c. Any existing conductors with resistance values less than (<) 100 MΩ - phase to ground – must be reported to your local Musco representative.

10/13/2026 C10 17 of 74

2016, 2025 Musco Sports Lighting, LLC • M-2168-enUS-20

5 of 6
QUOTE

CODE OF CONDUCT

In order to maintain a high-quality jobsite and installation, Subcontractor represents to Musco that it has the supervision necessary to, and shall train, manage, supervise, monitor, and inspect the activities of its employees for the purpose of enforcing compliance with these safety requirements. Subcontractor acknowledges that Musco does not undertake any duty toward Subcontractor’s employees to train, manage, supervise, monitor, and inspect their work activities for the purpose of enforcing compliance with these safety requirements, but Subcontractor agrees to abide by any reasonable recommendations made by Musco or Musco representatives with respect to safety.

Subcontractor agrees that it is or will be familiar with and shall abide by the safety rules and regulations of Musco and the Owner, including, but not limited to the Occupational Safety and Health Act of 1970 (OSHA), all rules and regulations established pursuant thereto, and all amendments and supplements thereto.

Subcontractor further agrees to require all its employees, subcontractors, and suppliers to comply with these requirements. Subcontractor shall also observe and comply with all laws with respect to environmental protection applicable to the Project.

Subcontractor shall require all its subcontractors, employees, visitors, suppliers, and agents under its direction to comply with the following:

1. GENERAL JOBSITE SAFETY AND CLEANLINESS.
a. Subcontractor’s employees and agents shall be required to wear appropriate personal protective equipment including, but not limited to, safety glasses with side shields, work shoes, fall protection devices, and hard hats.
b. Where a walking or working surface has an unprotected side or edge which is six feet or more above a lower level, Subcontractor shall use guardrail systems, safety net systems, or personal fall arrest systems.
c. Jobsite shall be kept free of debris including, but not limited to, cardboard and packing materials which can become windborne.
d. Construction equipment shall be parked during non-use in an orderly fashion so as not to create inconvenience to others using the jobsite.
e. Subcontractor shall provide for and ensure the use of safety equipment for the Project in accordance with Musco’s and Owner’s safety requirements, to the extent these may be stricter than federal, state, or local standards, or generally recognized industry applicable standards. f. Subcontractor shall provide the Musco project manager with an “Emergency List” showing Subcontractor’s designated medical doctor, hospital, insurance company, and any other health service providers, such list to be updated within 24 hours of any change in the information provided.
g. Within eight (8) hours from the time of an accident (or such shorter period as laws may require), Subcontractor shall advise Musco of any accident resulting in injury to any person or damage to any equipment or facility. Upon request, Subcontractor shall promptly furnish Musco with a written report of any such accident as well as a copy of all insurance and worker’s compensation claims involving the Project.
10/13/2026 C10 18 of 74

2016, 2025 Musco Sports Lighting, LLC • M-2168-enUS-20

6 of 6
QUOTE
h. Subcontractor shall maintain and inspect all construction equipment, including cranes and other lifting equipment, prior to each use. Subcontractor warrants that all equipment operators shall be qualified for each piece of construction equipment they intend to operate. Documentation of specific training is the responsibility of the Subcontractor. i. Jobsite shall be policed daily for compliance to the above conditions. j. Subcontractor’s employees and agents are prohibited from using drugs and alcohol on the Project property or being under the influence of alcohol or drugs while performing work on the Project. Anyone observed participating in or observed under the influence will be removed from the Project immediately and prohibited from returning, with no exceptions.

2. CONFORMANCE TO STANDARD MUSCO INSTALLATION GUIDELINES. a. Review and understand installation instructions are provided with every product installation. b. Education of installation personnel to allow for highest efficiency and lowest possibility of failure.
c. Verify that components have been assembled per Musco installation instructions. d. Verify plumb of concrete foundations prior to standing of poles.

3. PROVIDING A QUALITY INSTALLATION TEAM.
a. Subcontractor’s work directly reflects the quality of the installation and may indirectly relate to the quality of the product upon which Musco’s reputation is built. b. Provide and maintain quality installation equipment. Records of maintenance and/or calibration shall be provided upon request.
c. Personnel shall be knowledgeable in operation of equipment as well as installation of Musco product.
d. All personnel provided by Subcontractor shall understand the relationship developed by and between Subcontractor and Musco, also by and between Musco and the customer, and act accordingly.

10/13/2026 C10 19 of 74

Brengle Terrace Tennis And Basketball Courts LED Retrofit Vista,CA
Sales Representative: Karin Anderson · Designed By: D.Palmer · Design No.: 209881B · July 16, 2026 Not to be reproduced in whole or part without the written consent of Musco Lighting. ©1981, 2026 Musco Sports Lighting, LLC.

Sports Illustrated Stadium, Harrison, New Jersey, USA UBS Arena, Elmont, New York, USA Tottenham Hotspur FC Training Ground, Tottenham, London, UKIowa Women of Achievement Bridge, Des Moines, Iowa, USA 10/13/2026 C10 20 of 74

PROJECT SUMMARY
Not to be reproduced in whole or part without the wriƩen consent of Musco Sports LighƟng, LLC. ©1981, 2026 Musco Sports LighƟng, LLC.ENGINEERED DESIGN By: D.Palmer  File #209881B  16-Jul-26 Brengle Terrace Tennis And Basketball Courts LED Retrofit Vista,CA

LIGHTING SYSTEM
Structure/Fixture Summary
Structure ID Structure Height Fixt. Attachment Ht.Fixture Qty Fixture Type Load Circuit BA1-BA2 50'50'3 QF-900 2.75 kW D
T1 40'40'1 QF-900 0.75 kW C
40'1 QF-900 0.92 kW C
T2 40'40'2 QF-900 1.50 kW C
T3 40'40'2 QF-900 1.50 kW C
40'3 QF-900 2.75 kW B
T4 40'40'2 QF-900 1.50 kW C
T5 40'40'3 QF-900 2.75 kW B
T6 50'50'3 QF-900 2.75 kW A
T7 60'60'3 QF-900 2.75 kW B
60'5 QF-900 4.58 kW A
T8 50'50'3 QF-900 2.75 kW A
50'3 QF-900 2.75 kW B
T9 50'50'3 QF-900 2.75 kW A
T10 60'60'5 QF-900 4.58 kW A
T11 50'50'3 QF-900 2.75 kW A
13 48 42.77 kW
Circuit Summary
Circuit Description Load Fixture Qty
A Tennis 1-4 20.13 kW 22
B Tennis 5-6 10.98 kW 12
C Pickleball 6.16 kW 8
D Basketball 5.49 kW 6
Fixture Type Summary
Type Circuit Source Wattage Lumens L90 L80 L70 Quantity QF-900 A LED 5700K - 75 CRI 915W 117,000 ------22
QF-900 B LED 5700K - 75 CRI 915W 117,000 ------12
QF-900 C LED 5700K - 75 CRI 750W 89,000 ------7
QF-900 C LED 5700K - 75 CRI 915W 117,000 ------1
QF-900 D LED 5700K - 75 CRI 915W 117,000 ------6
Single Fixture Amperage Draw Chart
Driver SpeciĮcaƟons
(.90 min power factor)
Line Amperage Per Fixture
(max draw)
Single Phase Voltage 208
(60)
220
(60)
240
(60)
277
(60)
347
(60)
380
(60)
480
(60)
QF-900 5.3 5.0 4.6 4.0 3.2 2.9 2.3
Light Level Summary
Calculation Grid Summary
Grid Name Calculation Metric Illumination Ave Circuits Fixture QtyAveMinMaxMax/Min Ave/Min Basketball 1 Horizontal Illuminance 35.4 23 46 2.01 1.56 D 6 Basketball 2 Horizontal Illuminance 35.6 23 48 2.10 1.55 D 6 Pickleball Horizontal Illuminance 61.9 51 72 1.41 1.22 C 8 Project Spill @ 3ft.Horizontal Illuminance 0.001 0.00 0.01 --A 22 Project Spill @ 5ft.Max Candela Metric 68.952 0.00 926.19 --A 22 Project Spill @ 5ft.Max Vertical Illuminance Metric 0.002 0.00 0.03 --A 22 Project Spill @ 5ft.True Max Vert Illuminance Metric 0.002 0.00 0.03 --A 22 Tennis 1-4 Horizontal Illuminance 65.5 51 79 1.55 1.29 A 22 Tennis 1-4 Eval Horizontal 63.8 43 80 1.87 1.49 A 22
Tennis 5-6 Horizontal Illuminance 67.9 57 77 1.37 1.20 B 12 Tennis 5-6 Eval Horizontal 66.2 42 78 1.86 1.57 B 12
Guaranteed Performance:The ILLUMINATION described aboveis guaranteed per your Musco Warranty document.

Field Measurements:Individual field measurements may varyfrom computer-calculated predictions.

Electrical System Requirements:Refer to AmperageDraw Chart and/or the "Musco Control System Summary"for electrical sizing.

Installation Requirements:Results assume ± 3%nominal voltage at line side of the driver and structureslocated within 3 feet (1m) of design locations. 10/13/2026 C10 21 of 74

ILLUMINATION SUMMARY
Not to be reproduced in whole or part without the wriƩen consent of Musco Sports LighƟng, LLC. ©1981, 2026 Musco Sports LighƟng, LLC.ENGINEERED DESIGN By: D.Palmer  File #209881B  16-Jul-26 58 61 70 64 56
67 72 77 78 73
74 73 65 70 78
70 69 60 64 69
60 62 64 61 57
56 56 60 55 51
55 57 61 54 54
58 64 66 64 60
68 67 62 69 69
73 72 66 74 77
67 73 79 78 70
59 62 71 67 65
T6
T11
T10
T9 59'
12 2
'
67'
12 0
'
70'
8'
58'
12 3
'
68'
10 '
62'
12 5
'
T7
T8
SCALE IN FEET 1 : 40
0'40'80'
Equipment List For Areas Shown
Structure Fixtures

QTY STRUCTURE ID SIZE GRADE

ELEVATION

ABOVE FIELD

LEVEL FIXTURE TYPE QTY/POLE THIS
GRID
OTHER
GRIDS
3 T6
T9
T11
50'-50'QF-900 3 3 0
1 T7 60'-60'QF-900 3/5*5 3
1 T8 50'-50'QF-900 6 3 3
1 T10 60'-60'QF-900 5 5 0
6 Totals 28 22 6
*This structure utilizes a back-to-back mounting configuration Above Field Level is height of fixtures above area shown Brengle Terrace Tennis And Basketball Courts LED Retrofit Vista,CA
Grid Summary
Name:Tennis 1-4
Size:4 Court - 24' Spacing
Spacing:20.0' x 20.0'
Height:3.0' above grade
Illumination Summary

MAINTAINED HORIZONTAL FOOTCANDLES
Entire Grid
Guaranteed Average: 60
Scan Average:65.5
Maximum:79
Minimum:51
Avg/Min:1.29
Guaranteed Max/Min: 2
Max/Min:1.55
UG (adjacent pts):0.00
CU:0.63
No. of Points:60

FIXTURE INFORMATION
Fixture Type:QF-900
Design Lumens:113596 / 114150 / 114260
Avg Lamp Tilt Factor:1.000
Add'l Non-Rec LLF:1.000
Recoverable LLF:1.000
Total LLF:1.000
No. of Fixtures:22
Avg KW:20.13 (20.13 max)
Pole location(s)dimensions are relative
to 0,0 reference point(s)
Guaranteed Performance:The ILLUMINATION described aboveis guaranteed per your Musco Warranty document.

Field Measurements:Individual field measurements may varyfrom computer-calculated predictions.

Electrical System Requirements:Refer to AmperageDraw Chart and/or the "Musco Control System Summary"for electrical sizing.

Installation Requirements:Results assume ± 3%nominal voltage at line side of the driver and structureslocated within 3 feet (1m) of design locations. 10/13/2026 C10 22 of 74

ILLUMINATION SUMMARY
Not to be reproduced in whole or part without the wriƩen consent of Musco Sports LighƟng, LLC. ©1981, 2026 Musco Sports LighƟng, LLC.ENGINEERED DESIGN By: D.Palmer  File #209881B  16-Jul-26 59 66 70 69 72
76 74 71 72 71
63 64 57 64 76
61 63 57 67 77
64 65 69 75 77
57 60 76 73 74
T564'
60 '
60'
62 '
52'
71 '
59'
64 '
T7
T8
T3
SCALE IN FEET 1 : 20
0'20'40'
Equipment List For Areas Shown
Structure Fixtures

QTY STRUCTURE ID SIZE GRADE

ELEVATION

ABOVE FIELD

LEVEL FIXTURE TYPE QTY/POLE THIS
GRID
OTHER
GRIDS
1 T3 40'-40'QF-900 5 3 2
1 T5 40'-40'QF-900 3 3 0
1 T7 60'-60'QF-900 3/5*3 5
1 T8 50'-50'QF-900 6 3 3
4 Totals 22 12 10
*This structure utilizes a back-to-back mounting configuration Above Field Level is height of fixtures above area shown Brengle Terrace Tennis And Basketball Courts LED Retrofit Vista,CA
Grid Summary
Name:Tennis 5-6
Size:2 Court - 24' Spacing
Spacing:20.0' x 20.0'
Height:3.0' above grade
Illumination Summary

MAINTAINED HORIZONTAL FOOTCANDLES
Entire Grid
Guaranteed Average: 60
Scan Average:67.9
Maximum:77
Minimum:57
Avg/Min:1.20
Guaranteed Max/Min: 2
Max/Min:1.37
UG (adjacent pts):0.00
CU:0.59
No. of Points:30

FIXTURE INFORMATION
Fixture Type:QF-900
Design Lumens:113596 / 114150 / 114260
Avg Lamp Tilt Factor:1.000
Add'l Non-Rec LLF:1.000
Recoverable LLF:1.000
Total LLF:1.000
No. of Fixtures:12
Avg KW:10.98 (10.98 max)
Pole location(s)dimensions are relative
to 0,0 reference point(s)
Guaranteed Performance:The ILLUMINATION described aboveis guaranteed per your Musco Warranty document.

Field Measurements:Individual field measurements may varyfrom computer-calculated predictions.

Electrical System Requirements:Refer to AmperageDraw Chart and/or the "Musco Control System Summary"for electrical sizing.

Installation Requirements:Results assume ± 3%nominal voltage at line side of the driver and structureslocated within 3 feet (1m) of design locations. 10/13/2026 C10 23 of 74

ILLUMINATION SUMMARY
Not to be reproduced in whole or part without the wriƩen consent of Musco Sports LighƟng, LLC. ©1981, 2026 Musco Sports LighƟng, LLC.ENGINEERED DESIGN By: D.Palmer  File #209881B  16-Jul-26 62 66 60 56 55 54 55 56 59 51
51 65 69 65 62 62 61 60 61 64 62 51
52 64 68 66 63 66 66 61 58 63 64 57
53 65 69 66 64 65 67 64 60 61 64 59
53 68 68 65 61 62 67 72 66 65 65 59
60 60 57 55 58 65 69 67 68 64
T1
T2
T4
45'
31 '
60'
32 '
54'
42 '
54'
42 '
T3
SCALE IN FEET 1 : 20
0'20'40'
Equipment List For Areas Shown
Structure Fixtures

QTY STRUCTURE ID SIZE GRADE

ELEVATION

ABOVE FIELD

LEVEL FIXTURE TYPE QTY/POLE THIS
GRID
OTHER
GRIDS
3 T1-T2
T4 40'-40'QF-900 2 2 0
1 T3 40'-40'QF-900 5 2 3
4 Totals 11 8 3
Above Field Level is height of fixtures above area shown Brengle Terrace Tennis And Basketball Courts LED Retrofit Vista,CA
Grid Summary
Name:Pickleball
Size:57' x 122'
Spacing:10.0' x 10.0'
Height:3.0' above grade
Illumination Summary

MAINTAINED HORIZONTAL FOOTCANDLES
Entire Grid
Guaranteed Average: 60
Scan Average:61.9
Maximum:72
Minimum:51
Avg/Min:1.22
Guaranteed Max/Min: 2
Max/Min:1.41
UG (adjacent pts):1.29
CU:0.57
No. of Points:68

FIXTURE INFORMATION
Fixture Type:QF-900
Design Lumens:114260 / 88473
Avg Lamp Tilt Factor:1.000
Add'l Non-Rec LLF:1.000
Recoverable LLF:1.000
Total LLF:1.000
No. of Fixtures:8
Avg KW:6.16 (6.16 max)
Pole location(s)dimensions are relative
to 0,0 reference point(s)
Guaranteed Performance:The ILLUMINATION described aboveis guaranteed per your Musco Warranty document.

Field Measurements:Individual field measurements may varyfrom computer-calculated predictions.

Electrical System Requirements:Refer to AmperageDraw Chart and/or the "Musco Control System Summary"for electrical sizing.

Installation Requirements:Results assume ± 3%nominal voltage at line side of the driver and structureslocated within 3 feet (1m) of design locations. 10/13/2026 C10 24 of 74

ILLUMINATION SUMMARY
Not to be reproduced in whole or part without the wriƩen consent of Musco Sports LighƟng, LLC. ©1981, 2026 Musco Sports LighƟng, LLC.ENGINEERED DESIGN By: D.Palmer  File #209881B  16-Jul-26 232834403828
283340454333
323540444232
353637393829
373535373426
373535373527
353638414031
323540454535
283340464435
232632373828
107'
2'
42'
2'
BA2
BA1
SCALE IN FEET 1 : 20
0'20'40'
Equipment List For Areas Shown
Structure Fixtures

QTY STRUCTURE ID SIZE GRADE

ELEVATION

ABOVE FIELD

LEVEL FIXTURE TYPE QTY/POLE THIS
GRID
OTHER
GRIDS
2 BA1-BA2 50'-50'QF-900 3 3 0
2 Totals 6 6 0
Above Field Level is height of fixtures above area shown Brengle Terrace Tennis And Basketball Courts LED Retrofit Vista,CA
Grid Summary
Name:Basketball 1
Size:94' x 50'
Spacing:10.0' x 10.0'
Height:3.0' above grade
Illumination Summary

MAINTAINED HORIZONTAL FOOTCANDLES
Entire Grid
Scan Average: 35.4
Maximum:46
Minimum:23
Avg/Min:1.56
Max/Min: 2.01
UG (adjacent pts):1.35
CU:0.31
No. of Points:60

FIXTURE INFORMATION
Fixture Type:QF-900
Design Lumens:114150 / 114260
Avg Lamp Tilt Factor:1.000
Add'l Non-Rec LLF:1.000
Recoverable LLF:1.000
Total LLF:1.000
No. of Fixtures:6
Avg KW:5.49 (5.49 max)
Pole location(s)dimensions are relative
to 0,0 reference point(s)
Guaranteed Performance:The ILLUMINATION described aboveis guaranteed per your Musco Warranty document.

Field Measurements:Individual field measurements may varyfrom computer-calculated predictions.

Electrical System Requirements:Refer to AmperageDraw Chart and/or the "Musco Control System Summary"for electrical sizing.

Installation Requirements:Results assume ± 3%nominal voltage at line side of the driver and structureslocated within 3 feet (1m) of design locations. 10/13/2026 C10 25 of 74

ILLUMINATION SUMMARY
Not to be reproduced in whole or part without the wriƩen consent of Musco Sports LighƟng, LLC. ©1981, 2026 Musco Sports LighƟng, LLC.ENGINEERED DESIGN By: D.Palmer  File #209881B  16-Jul-26 304140332724
374748413328
364546403532
303940373534
253336343436
253336353436
283840373534
344446403531
354547413327
2940403427231.38
41'
1'
109'
3'
BA2
BA1
SCALE IN FEET 1 : 20
0'20'40'
Equipment List For Areas Shown
Structure Fixtures

QTY STRUCTURE ID SIZE GRADE

ELEVATION

ABOVE FIELD

LEVEL FIXTURE TYPE QTY/POLE THIS
GRID
OTHER
GRIDS
2 BA1-BA2 50'-50'QF-900 3 3 0
2 Totals 6 6 0
Above Field Level is height of fixtures above area shown Brengle Terrace Tennis And Basketball Courts LED Retrofit Vista,CA
Grid Summary
Name:Basketball 2
Size:94' x 50'
Spacing:10.0' x 10.0'
Height:3.0' above grade
Illumination Summary

MAINTAINED HORIZONTAL FOOTCANDLES
Entire Grid
Scan Average: 35.6
Maximum:48
Minimum:23
Avg/Min:1.55
Max/Min: 2.10
UG (adjacent pts):1.38
CU:0.31
No. of Points:60

FIXTURE INFORMATION
Fixture Type:QF-900
Design Lumens:114150 / 114260
Avg Lamp Tilt Factor:1.000
Add'l Non-Rec LLF:1.000
Recoverable LLF:1.000
Total LLF:1.000
No. of Fixtures:6
Avg KW:5.49 (5.49 max)
Pole location(s)dimensions are relative
to 0,0 reference point(s)
Guaranteed Performance:The ILLUMINATION described aboveis guaranteed per your Musco Warranty document.

Field Measurements:Individual field measurements may varyfrom computer-calculated predictions.

Electrical System Requirements:Refer to AmperageDraw Chart and/or the "Musco Control System Summary"for electrical sizing.

Installation Requirements:Results assume ± 3%nominal voltage at line side of the driver and structureslocated within 3 feet (1m) of design locations. 10/13/2026 C10 26 of 74

ILLUMINATION SUMMARY
Not to be reproduced in whole or part without the wriƩen consent of Musco Sports LighƟng, LLC. ©1981, 2026 Musco Sports LighƟng, LLC.ENGINEERED DESIGN By: D.Palmer  File #209881B  16-Jul-26 T6
T11
T10
T9
(-5
6 .
9 5
'
,

4 4
4 .
5 7
'
,

0 .
0 0
'
)
T5
T7
T8
(58
.
9 2
'
,

5 1
3 .
4 1
'
,

0 .
0 0
'
)
T1
T2T4
T3
(18
0 .
6 3
'
,

4 9
2 .
0 1
'
,

0 .
0 0
'
)
BA2
BA1 (-3
2 .
3 2
'
,

0 .
3 3
'
,

0 .
0 0
'
)
(34
.
1 2
'
,

1 .
3 0
'
,

0 .
0 0
'
)

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.000.000.000.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.000.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.01

0.01 0.01

0.01 0.00

0.01 0.01

0.01 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00
SCALE IN FEET 1 : 100
0'100'200'
Equipment List For Areas Shown
Structure Fixtures

QTY STRUCTURE ID SIZE GRADE

ELEVATION

ABOVE FIELD

LEVEL FIXTURE TYPE QTY/POLE THIS
GRID
OTHER
GRIDS
3 T6
T9
T11
50'-50'QF-900 3 3 0
1 T7 60'-60'QF-900 3/5*5 3
1 T8 50'-50'QF-900 6 3 3
1 T10 60'-60'QF-900 5 5 0
6 Totals 28 22 6
*This structure utilizes a back-to-back mounting configuration Above Field Level is height of fixtures above area shown Brengle Terrace Tennis And Basketball Courts LED Retrofit Vista,CA
Grid Summary
Name:Project Spill @ 3ft.

Spacing:30.0'
Height:3.0' above grade
Illumination Summary

INITIAL HORIZONTAL FOOTCANDLES
Entire Grid
Scan Average: 0.001
Maximum:0.01
Minimum:0.00
CU:0.00
No. of Points:99

FIXTURE INFORMATION
Fixture Type:QF-900
Design Lumens:113596 / 114150 / 114260
Avg Lamp Tilt Factor:1.000
Add'l Non-Rec LLF:1.000
Recoverable LLF:1.000
Total LLF:1.000
No. of Fixtures:22
Avg KW:20.13 (20.13 max)
Pole location(s)dimensions are relative
to 0,0 reference point(s)
Guaranteed Performance:The ILLUMINATION described aboveis guaranteed per your Musco Warranty document.

Field Measurements:Individual field measurements may varyfrom computer-calculated predictions.

Electrical System Requirements:Refer to AmperageDraw Chart and/or the "Musco Control System Summary"for electrical sizing.

Installation Requirements:Results assume ± 3%nominal voltage at line side of the driver and structureslocated within 3 feet (1m) of design locations. 10/13/2026 C10 27 of 74

ILLUMINATION SUMMARY
Not to be reproduced in whole or part without the wriƩen consent of Musco Sports LighƟng, LLC. ©1981, 2026 Musco Sports LighƟng, LLC.ENGINEERED DESIGN By: D.Palmer  File #209881B  16-Jul-26 T6
T11
T10
T9
(-5
6 .
9 5
'
,

4 4
4 .
5 7
'
,

0 .
0 0
'
)
T5
T7
T8
(58
.
9 2
'
,

5 1
3 .
4 1
'
,

0 .
0 0
'
)
T1
T2T4
T3
(18
0 .
6 3
'
,

4 9
2 .
0 1
'
,

0 .
0 0
'
)
BA2
BA1 (-3
2 .
3 2
'
,

0 .
3 3
'
,

0 .
0 0
'
)
(34
.
1 2
'
,

1 .
3 0
'
,

0 .
0 0
'
)

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.000.006.1697.73

63.68 0.65

0.01 0.13

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 8.26

3.66 0.00

15.42 111.59
354.36
528.49
796.71
926.19
631.84
308.92
407.47
452.90
343.51
478.96
271.51

13.14 0.00

0.00 0.44

0.00 1.12

42.79 0.00

0.00 SCALE IN FEET 1 : 100
0'100'200'
Equipment List For Areas Shown
Structure Fixtures

QTY STRUCTURE ID SIZE GRADE

ELEVATION

ABOVE FIELD

LEVEL FIXTURE TYPE QTY/POLE THIS
GRID
OTHER
GRIDS
3 T6
T9
T11
50'-50'QF-900 3 3 0
1 T7 60'-60'QF-900 3/5*5 3
1 T8 50'-50'QF-900 6 3 3
1 T10 60'-60'QF-900 5 5 0
6 Totals 28 22 6
*This structure utilizes a back-to-back mounting configuration Above Field Level is height of fixtures above area shown Brengle Terrace Tennis And Basketball Courts LED Retrofit Vista,CA
Grid Summary
Name:Project Spill @ 5ft.

Spacing:30.0'
Height:5.0' above grade
Illumination Summary

INITIAL CANDELA (PER FIXTURE)
Entire Grid
Scan Average: 68.952
Maximum:926.19
Minimum:0.00
CU:0.00
No. of Points:99

FIXTURE INFORMATION
Fixture Type:QF-900
Design Lumens:113596 / 114150 / 114260
Avg Lamp Tilt Factor:1.000
Add'l Non-Rec LLF:1.000
Recoverable LLF:1.000
Total LLF:1.000
No. of Fixtures:22
Avg KW:20.13 (20.13 max)
Pole location(s)dimensions are relative
to 0,0 reference point(s)
Guaranteed Performance:The ILLUMINATION described aboveis guaranteed per your Musco Warranty document.

Field Measurements:Individual field measurements may varyfrom computer-calculated predictions.

Electrical System Requirements:Refer to AmperageDraw Chart and/or the "Musco Control System Summary"for electrical sizing.

Installation Requirements:Results assume ± 3%nominal voltage at line side of the driver and structureslocated within 3 feet (1m) of design locations. 10/13/2026 C10 28 of 74

ILLUMINATION SUMMARY
Not to be reproduced in whole or part without the wriƩen consent of Musco Sports LighƟng, LLC. ©1981, 2026 Musco Sports LighƟng, LLC.ENGINEERED DESIGN By: D.Palmer  File #209881B  16-Jul-26 T6
T11
T10
T9
(-5
6 .
9 5
'
,

4 4
4 .
5 7
'
,

0 .
0 0
'
)
T5
T7
T8
(58
.
9 2
'
,

5 1
3 .
4 1
'
,

0 .
0 0
'
)
T1
T2T4
T3
(18
0 .
6 3
'
,

4 9
2 .
0 1
'
,

0 .
0 0
'
)
BA2
BA1 (-3
2 .
3 2
'
,

0 .
3 3
'
,

0 .
0 0
'
)
(34
.
1 2
'
,

1 .
3 0
'
,

0 .
0 0
'
)

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.000.000.000.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.000.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.01

0.01 0.02

0.03 0.03

0.02 0.01

0.01 0.02

0.02 0.01

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.01

0.00 0.00
SCALE IN FEET 1 : 100
0'100'200'
Equipment List For Areas Shown
Structure Fixtures

QTY STRUCTURE ID SIZE GRADE

ELEVATION

ABOVE FIELD

LEVEL FIXTURE TYPE QTY/POLE THIS
GRID
OTHER
GRIDS
3 T6
T9
T11
50'-50'QF-900 3 3 0
1 T7 60'-60'QF-900 3/5*5 3
1 T8 50'-50'QF-900 6 3 3
1 T10 60'-60'QF-900 5 5 0
6 Totals 28 22 6
*This structure utilizes a back-to-back mounting configuration Above Field Level is height of fixtures above area shown Brengle Terrace Tennis And Basketball Courts LED Retrofit Vista,CA
Grid Summary
Name:Project Spill @ 5ft.

Spacing:30.0'
Height:5.0' above grade
Illumination Summary

INITIAL MAX VERTICAL FOOTCANDLES
Entire Grid
Scan Average: 0.002
Maximum:0.03
Minimum:0.00
CU:0.00
No. of Points:99

FIXTURE INFORMATION
Fixture Type:QF-900
Design Lumens:113596 / 114150 / 114260
Avg Lamp Tilt Factor:1.000
Add'l Non-Rec LLF:1.000
Recoverable LLF:1.000
Total LLF:1.000
No. of Fixtures:22
Avg KW:20.13 (20.13 max)
Pole location(s)dimensions are relative
to 0,0 reference point(s)
Guaranteed Performance:The ILLUMINATION described aboveis guaranteed per your Musco Warranty document.

Field Measurements:Individual field measurements may varyfrom computer-calculated predictions.

Electrical System Requirements:Refer to AmperageDraw Chart and/or the "Musco Control System Summary"for electrical sizing.

Installation Requirements:Results assume ± 3%nominal voltage at line side of the driver and structureslocated within 3 feet (1m) of design locations. 10/13/2026 C10 29 of 74

EQUIPMENT LAYOUT
Not to be reproduced in whole or part without the wriƩen consent of Musco Sports LighƟng, LLC. ©1981, 2026 Musco Sports LighƟng, LLC.ENGINEERED DESIGN By: D.Palmer  File #209881B  16-Jul-26 Brengle Terrace Tennis And Basketball Courts LED Retrofit Vista,CA
Tennis 1-4
4 Court - 24' Spacing
T6
T11
T10
T9
(-5
6 .
9 5
'
,

4 4
4 .
5 7
'
,

0 .
0 0
'
)
Tennis 5-6
2 Court - 24' Spacing
T5
T7
T8
(58
.
9 2
'
,

5 1
3 .
4 1
'
,

0 .
0 0
'
)
Pickleball
57' x 122'
T1
T2T4
T3
(18
0 .
6 3
'
,

4 9
2 .
0 1
'
,

0 .
0 0
'
)
Basketball 1
94' x 50'
BA2
BA1 (-3
2 .
3 2
'
,

0 .
3 3
'
,

0 .
0 0
'
)
Basketball 2
94' x 50'
(34
.
1 2
'
,

1 .
3 0
'
,

0 .
0 0
'
)
(0.00', 0.00', 0.00')
SCALE IN FEET 1 : 80
0'80'160'
Pole location(s)dimensions are relative
to 0,0 reference point(s)
Equipment Layout
INCLUDES:· Basketball 1· Basketball 2· Pickleball· Tennis 1-4· Tennis 5-6 Electrical System Requirements:Refer to AmperageDraw Chart and/or the "Musco Control System Summary"for electrical sizing.

Installation Requirements:Results assume ± 3%nominal voltage at line side of the driver and structureslocated within 3 feet (1m) of design locations.

Single Fixture Amperage Draw Chart
Driver SpeciĮcaƟons
(.90 min power factor)
Line Amperage Per Fixture
(max draw)
Single Phase Voltage 208
(60)
220
(60)
240
(60)
277
(60)
347
(60)
380
(60)
480
(60)
QF-900 5.3 5.0 4.6 4.0 3.2 2.9 2.3
10/13/2026 C10 30 of 74

2016, 2025 Musco Sports Lighting, LLC • M-2168-enUS-20

1 of 6
QUOTE
Date: August 28, 2026 Project: Thibido Park Retrofit
To: City of Vista Vista, CA
Musco Project Number: 209891

Sourcewell
Master Project: 199030, Contract Number: 041123-MSL, Expiration: 06/16/2027 Category: Sports lighting with related supplies and services

All purchase orders should note the following:

Sourcewell Purchase – Contract Number: 041123-MSL
Sourcewell Member Number: 28780

Quotation Price – Materials Delivered to Job Site and Installation

Courts:

Musco Materials: $ 29,400.

Installation: $ 5,600.

Estimated Sales tax: $ 2,425.

Project Total: $ 37,425.

Sales tax is estimate and based on 8.25% rate. Bonding is not included. Labor, installation, and unloading of the equipment are included. Quote is confidential. Pricing and lead times are effective for 120 days only.

CA Public Works Contractor Number: 1000004278, Electrical Contractor (C-10 License) Number: 797757

Quick-Fit® Solution with Total Light Control – TLC for LED™ Technology System Description:

Existing System Components
 Pre-cast concrete bases
 Galvanized steel poles
New System Components
 Factory-aimed QuickFitTM luminaires
 Pole length factory assembled wire harnesses
 Factory wired and tested remote electrical component enclosures  UL listed as a complete system
Installation - QuickFitTM
 For installation the following will be provided: demo and disposal of existing fixtures and parts, labor, lift and equipment to install all LED fixtures and components. Does not include electrical conduit, wire or service, and assumes re-use of electrical on-site  Please see full Installation Scope of Work below
On Field Performance
 Guaranteed light levels to match existing
 Existing controls to be utilized for remote scheduling  Reduction of glare compared to the existing system
Control Systems and Services
 Utilizes existing Musco Control-Link® system on-site - to provide remote on/off control with 24/7 customer support
10/13/2026 C10 31 of 74

2016, 2025 Musco Sports Lighting, LLC • M-2168-enUS-20

2 of 6
QUOTE
Operation and Warranty Services
 10 year warranty that covers materials and onsite labor, eliminating 100% of your maintenance costs for 10 years
 Warranty starts the date of shipment

Payment Terms
Final payment terms to be coordinated with Musco’s credit department.

Please email a copy of the Purchase Order to:

Musco Sports Lighting, LLC
Attn: Karin Anderson
Email: [email protected]

All Purchase orders should note the following:

Sourcewell Purchase – Contract Number: 041123-MSL
Sourcewell Member Number: 28780

Delivery Timing
8 - 10 weeks for delivery of materials to the job site from the time of order, submittal approval, and confirmation of order details including voltage, phase, and pole/luminaire locations. Installation is expected to take 3-5 business days.

Notes
Quote is based on following conditions:
 Shipment of entire project together to one location.
 Structural Pole Load check is included, and is currently in progress  Structural code and wind speed = 2025 CBC, 95 mi/h, Exposure C, Importance Factor 1.0.  Installation is included- per scope of work below

Thank you for considering Musco for your lighting needs. Please contact me with any questions or if you need additional details.

Karin Anderson
Field Sales Representative
Musco Sports Lighting, LLC
Phone: 858-232-1620
E-mail: [email protected]

10/13/2026 C10 32 of 74

2016, 2025 Musco Sports Lighting, LLC • M-2168-enUS-20

3 of 6
QUOTE
Thibido Park
Vista, CA
QuickFit Retrofit Scope of Work

Customer Responsibilities:

1. Complete access to the site for construction using standard 2-wheel drive rubber tire equipment.

2. Locate existing underground utilities not covered by your local utilities (i.e. water lines, electrical lines, irrigation systems, and sprinkler heads). Musco or Subcontractor are not be responsible for repairs to unmarked utilities.

3. Locate and mark field reference points per Musco supplied layout (i.e. home plate, center of FB field).

4. Ensure usability of existing underground wiring.

5. Pay any necessary power company fees and requirements.

6. Pay all permitting fees.

Musco Responsibilities:

1. Provide required fixtures, electrical enclosures, mounts, hardware, wire harnesses, and control cabinets.

2. Provide fixture layout and aiming diagram.

3. Provide Contract Management as required.

4. Assist our installing subcontractor and ensure all project responsibilities are satisfied.

Subcontractor Responsibilities
General:

1. Obtain any required permitting.

2. Contact the facility owner/manager to confirm the existing private underground utilities and irrigation systems have been located and are clearly marked to avoid damage from construction equipment. Notify owner and Musco regarding damage which occurred to unmarked utilities.

3. Provide labor, equipment, and materials to offload equipment at jobsite per scheduled delivery.

4. Provide storage containers for material, (including electrical components enclosures), as needed.

5. Provide necessary waste disposal and daily cleanup.

6. Provide adequate security to protect Musco delivered products from theft, vandalism, or damage during the installation.

7. Keep all heavy equipment off playing fields when possible. Repair damage to grounds which exceeds that which would be expected. Indentations caused by heavy equipment traveling over dry ground would be an example of expected damage. Ruts and sod damage caused by equipment traveling over wet grounds would be an example of damage requiring repair.

8. Provide startup and aiming as required to provide complete and operating sports lighting system.

9. Installation to commence upon delivery and proceed without interruption until complete. Musco to be immediately notified of any breaks in schedule or delays.

10. Complete and submit Musco provided closeout checklist including required pictures. 10/13/2026 C10 33 of 74

2016, 2025 Musco Sports Lighting, LLC • M-2168-enUS-20

4 of 6
QUOTE
Demolition:

1. Remove and dispose of the existing fixtures, and electrical enclosures, parts. This will include the recycling of lamps, aluminum reflectors, ballast, and steel, as necessary.

2. Leave existing ground wires and power feed in place for connection to new lighting equipment.

Retrofit Musco Equipment to Existing Poles:

1. Provide labor, materials, and equipment to assemble and install Musco QuickFit equipment on existing poles and terminate grounding and power feed. Power feed may need to be reworked to adapt to the new Musco equipment.

2. Ensure grounding components meet minimum standards required by NEC and NFPA780.

3. Ensure all Musco components are bonded to both equipment and lightning grounds. No upward sweeps allowed for lightning down conductor or bonding jumper(s). See installation instructions for further information.

4. Test ground resistance with 3-point ground resistance test, using instructions provided. Confirm 25 ohms or less for each pole. Install additional ground rods or create grounding grid until resistance of 25 ohms or less is achieved. Record all results on form provided and submit readings to Musco.

Electrical:

1. Provide materials, and equipment to reuse existing electrical service panels as required.

2. Provide materials, and equipment to reuse existing electrical wiring as permitted.

3. Provide materials, and equipment to reuse existing Control Link cabinet.

4. Complete required insulation resistance tests on all current-carrying conductors per ANSI/NETA ATS-2021.
a. Use the instructions and forms provided by Musco to provide test results to your Musco contact. Note conduits must be full of water prior to testing. b. Any new conductors with resistance values less than (<) 100 MΩ - phase to ground - must be repaired or replaced to meet the standard.
c. Any existing conductors with resistance values less than (<) 100 MΩ - phase to ground – must be reported to your local Musco representative.

10/13/2026 C10 34 of 74

2016, 2025 Musco Sports Lighting, LLC • M-2168-enUS-20

5 of 6
QUOTE

CODE OF CONDUCT

In order to maintain a high-quality jobsite and installation, Subcontractor represents to Musco that it has the supervision necessary to, and shall train, manage, supervise, monitor, and inspect the activities of its employees for the purpose of enforcing compliance with these safety requirements. Subcontractor acknowledges that Musco does not undertake any duty toward Subcontractor’s employees to train, manage, supervise, monitor, and inspect their work activities for the purpose of enforcing compliance with these safety requirements, but Subcontractor agrees to abide by any reasonable recommendations made by Musco or Musco representatives with respect to safety.

Subcontractor agrees that it is or will be familiar with and shall abide by the safety rules and regulations of Musco and the Owner, including, but not limited to the Occupational Safety and Health Act of 1970 (OSHA), all rules and regulations established pursuant thereto, and all amendments and supplements thereto.

Subcontractor further agrees to require all its employees, subcontractors, and suppliers to comply with these requirements. Subcontractor shall also observe and comply with all laws with respect to environmental protection applicable to the Project.

Subcontractor shall require all its subcontractors, employees, visitors, suppliers, and agents under its direction to comply with the following:

1. GENERAL JOBSITE SAFETY AND CLEANLINESS.
a. Subcontractor’s employees and agents shall be required to wear appropriate personal protective equipment including, but not limited to, safety glasses with side shields, work shoes, fall protection devices, and hard hats.
b. Where a walking or working surface has an unprotected side or edge which is six feet or more above a lower level, Subcontractor shall use guardrail systems, safety net systems, or personal fall arrest systems.
c. Jobsite shall be kept free of debris including, but not limited to, cardboard and packing materials which can become windborne.
d. Construction equipment shall be parked during non-use in an orderly fashion so as not to create inconvenience to others using the jobsite.
e. Subcontractor shall provide for and ensure the use of safety equipment for the Project in accordance with Musco’s and Owner’s safety requirements, to the extent these may be stricter than federal, state, or local standards, or generally recognized industry applicable standards. f. Subcontractor shall provide the Musco project manager with an “Emergency List” showing Subcontractor’s designated medical doctor, hospital, insurance company, and any other health service providers, such list to be updated within 24 hours of any change in the information provided.
g. Within eight (8) hours from the time of an accident (or such shorter period as laws may require), Subcontractor shall advise Musco of any accident resulting in injury to any person or damage to any equipment or facility. Upon request, Subcontractor shall promptly furnish Musco with a written report of any such accident as well as a copy of all insurance and worker’s compensation claims involving the Project.
10/13/2026 C10 35 of 74

2016, 2025 Musco Sports Lighting, LLC • M-2168-enUS-20

6 of 6
QUOTE
h. Subcontractor shall maintain and inspect all construction equipment, including cranes and other lifting equipment, prior to each use. Subcontractor warrants that all equipment operators shall be qualified for each piece of construction equipment they intend to operate. Documentation of specific training is the responsibility of the Subcontractor. i. Jobsite shall be policed daily for compliance to the above conditions. j. Subcontractor’s employees and agents are prohibited from using drugs and alcohol on the Project property or being under the influence of alcohol or drugs while performing work on the Project. Anyone observed participating in or observed under the influence will be removed from the Project immediately and prohibited from returning, with no exceptions.

2. CONFORMANCE TO STANDARD MUSCO INSTALLATION GUIDELINES. a. Review and understand installation instructions are provided with every product installation. b. Education of installation personnel to allow for highest efficiency and lowest possibility of failure.
c. Verify that components have been assembled per Musco installation instructions. d. Verify plumb of concrete foundations prior to standing of poles.

3. PROVIDING A QUALITY INSTALLATION TEAM.
a. Subcontractor’s work directly reflects the quality of the installation and may indirectly relate to the quality of the product upon which Musco’s reputation is built. b. Provide and maintain quality installation equipment. Records of maintenance and/or calibration shall be provided upon request.
c. Personnel shall be knowledgeable in operation of equipment as well as installation of Musco product.
d. All personnel provided by Subcontractor shall understand the relationship developed by and between Subcontractor and Musco, also by and between Musco and the customer, and act accordingly.

10/13/2026 C10 36 of 74

Thibodo Park Tennis Basketball LED RETRO
Vista,CA
Sales Representative: Karin Anderson · Designed By: D.Lohman · Design No.: 209891A · July 21, 2026 Not to be reproduced in whole or part without the written consent of Musco Lighting. ©1981, 2026 Musco Sports Lighting, LLC.

Sports Illustrated Stadium, Harrison, New Jersey, USA UBS Arena, Elmont, New York, USA Tottenham Hotspur FC Training Ground, Tottenham, London, UKIowa Women of Achievement Bridge, Des Moines, Iowa, USA 10/13/2026 C10 37 of 74

PROJECT SUMMARY
Not to be reproduced in whole or part without the wriƩen consent of Musco Sports LighƟng, LLC. ©1981, 2026 Musco Sports LighƟng, LLC.ENGINEERED DESIGN By: D.Lohman  File #209891A  21-Jul-26 Thibodo Park Tennis Basketball LED RETRO
Vista,CA

LIGHTING SYSTEM
Structure/Fixture Summary
Structure ID Structure Height Fixt. Attachment Ht.Fixture Qty Fixture Type Design Load Circuit T1 40'40'2 QF-900 1.83 kW A
T2-T3 40'40'2 QF-900 1.83 kW A
27'1 QF-900 0.75 kW B
T4 40'40'2 QF-900 1.83 kW A
4 10 8.80 kW
*Fixtures in this design have dimmed output values to meet design specific needs.

Circuit Summary
Circuit Description Design Load Fixture Qty
A Tennis 7.30 kW 8
B Basketball 1.50 kW 2
Fixture Type Summary
Type Circuit Source Avg. Wattage Avg. Lumens L90 L80 L70 Quantity QF-900 A LED 5700K - 75 CRI 912W 115,298 ------8
QF-900 B LED 5700K - 75 CRI 750W 89,000 ------2
Single Fixture Amperage Draw Chart
Driver SpeciĮcaƟons
(.90 min power factor)
Line Amperage Per Fixture
(max draw)
Single Phase Voltage 208
(60)
220
(60)
240
(60)
277
(60)
347
(60)
380
(60)
480
(60)
QF-900 5.3 5.0 4.6 4.0 3.2 2.9 2.3
*Amp draw based on 100% fixture output, consult design specific datasheet for adjusted amperage draw chart Light Level Summary
Calculation Grid Summary
Grid Name Calculation Metric Illumination Ave Circuits Fixture QtyAveMinMaxMax/Min Ave/Min Basketball Horizontal Illuminance 34.56 19 57 2.96 1.79 B 2 Pickleball 1-4 Horizontal Illuminance 50.41 35 69 1.96 1.43 A 8 Project Spill 150' Offset @ 3ft.Horizontal Illuminance 0.0000 0.00 0.00 --A,B 10 Project Spill 150' Offset @ 5ft.Max Candela Metric 0.7633 0.00 13.10 --A,B 10 Project Spill 150' Offset @ 5ft.Max Vertical Illuminance Metric 0.0000 0.00 0.00 --A,B 10 Tennis Horizontal Illuminance 53.07 44 68 1.57 1.22 A 8 Guaranteed Performance:The ILLUMINATION described aboveis guaranteed per your Musco Warranty document.

Field Measurements:Individual field measurements may varyfrom computer-calculated predictions.

Electrical System Requirements:Refer to AmperageDraw Chart and/or the "Musco Control System Summary"for electrical sizing.

Installation Requirements:Results assume ± 3%nominal voltage at line side of the driver and structureslocated within 3 feet (1m) of design locations. 10/13/2026 C10 38 of 74

ILLUMINATION SUMMARY
Not to be reproduced in whole or part without the wriƩen consent of Musco Sports LighƟng, LLC. ©1981, 2026 Musco Sports LighƟng, LLC.ENGINEERED DESIGN By: D.Lohman  File #209891A  21-Jul-26 68 51
45 49
67 47
59 68
56 44
52 46
50 47
46 42
'
33'
42 '
33'
42 '
87'
35 '
87'
T4
T1
T3
T2
SCALE IN FEET 1 : 30
0'30'60'
Equipment List For Areas Shown
Structure Fixtures

QTY STRUCTURE ID SIZE GRADE

ELEVATION

ABOVE FIELD

LEVEL FIXTURE TYPE QTY/POLE THIS
GRID
OTHER
GRIDS
1 T1 40'-40'QF-900 2 2 0
2 T2-T3 40'7'47'QF-900 2 2 0

33.5'QF-900 1 0 1
1 T4 40'-40.2'QF-900 2 2 0
4 Totals 10 8 2
Above Field Level is height of fixtures above area shown Thibodo Park Tennis Basketball LED RETRO
Vista,CA
Grid Summary
Name:Tennis
Size:1 Court - 18' Spacing
Spacing:20.0' x 20.0'
Height:3.0' above grade
Illumination Summary

INITIAL HORIZONTAL FOOTCANDLES
Entire Grid
Scan Average: 53.07
Maximum:68
Minimum:44
Avg/Min:1.22
Max/Min: 1.57
UG (adjacent pts):0.00
CU:0.35
No. of Points:15

FIXTURE INFORMATION
Applied Circuits:A
No. of Fixtures:8
Total Load:7.30 kW
Pole location(s)dimensions are relative
to 0,0 reference point(s)
Guaranteed Performance:The ILLUMINATION described aboveis guaranteed per your Musco Warranty document.

Field Measurements:Individual field measurements may varyfrom computer-calculated predictions.

Electrical System Requirements:Refer to AmperageDraw Chart and/or the "Musco Control System Summary"for electrical sizing.

Installation Requirements:Results assume ± 3%nominal voltage at line side of the driver and structureslocated within 3 feet (1m) of design locations. 10/13/2026 C10 39 of 74

ILLUMINATION SUMMARY
Not to be reproduced in whole or part without the wriƩen consent of Musco Sports LighƟng, LLC. ©1981, 2026 Musco Sports LighƟng, LLC.ENGINEERED DESIGN By: D.Lohman  File #209891A  21-Jul-26 52 50
45 45
49 51
47 44
45 46
40 53
58 49
44 49
57 59
50 43
46 54
48 52
52 48
47 55
68 67
56 46
47 55
55 43
48 45
47 58
69 68
58 49
48 51
48 36
50 51
49 50
55 57
56 55
55 50
37 54
57 46
37 35
37 44
57 62
47 41
'
88'
43 '
88'
41 '
32'
36 '
32'
T4
T1
T3
T2
SCALE IN FEET 1 : 30
0'30'60'
Equipment List For Areas Shown
Structure Fixtures

QTY STRUCTURE ID SIZE GRADE

ELEVATION

ABOVE FIELD

LEVEL FIXTURE TYPE QTY/POLE THIS
GRID
OTHER
GRIDS
1 T1 40'-40'QF-900 2 2 0
2 T2-T3 40'7'47'QF-900 2 2 0

33.5'QF-900 1 0 1
1 T4 40'-40.2'QF-900 2 2 0
4 Totals 10 8 2
Above Field Level is height of fixtures above area shown Thibodo Park Tennis Basketball LED RETRO
Vista,CA
Grid Summary
Name:Pickleball 1-4
Size:56' x 116'
Spacing:10.0' x 10.0'
Height:3.0' above grade
Illumination Summary

MAINTAINED HORIZONTAL FOOTCANDLES
Entire Grid
Scan Average: 50.41
Maximum:69
Minimum:35
Avg/Min:1.43
Max/Min: 1.96
UG (adjacent pts):1.56
CU:0.39
No. of Points:69

FIXTURE INFORMATION
Applied Circuits:A
No. of Fixtures:8
Total Load:7.30 kW
Pole location(s)dimensions are relative
to 0,0 reference point(s)
Guaranteed Performance:The ILLUMINATION described aboveis guaranteed per your Musco Warranty document.

Field Measurements:Individual field measurements may varyfrom computer-calculated predictions.

Electrical System Requirements:Refer to AmperageDraw Chart and/or the "Musco Control System Summary"for electrical sizing.

Installation Requirements:Results assume ± 3%nominal voltage at line side of the driver and structureslocated within 3 feet (1m) of design locations. 10/13/2026 C10 40 of 74

ILLUMINATION SUMMARY
Not to be reproduced in whole or part without the wriƩen consent of Musco Sports LighƟng, LLC. ©1981, 2026 Musco Sports LighƟng, LLC.ENGINEERED DESIGN By: D.Lohman  File #209891A  21-Jul-26 57 49 32 20
39 42 34 25
24 32 32 25
20 28 32 27
29 38 36 28
53 50 38 28
54 47 31 19
27'
34 '
27'
43 '
T3
T2
SCALE IN FEET 1 : 30
0'30'60'
Equipment List For Areas Shown
Structure Fixtures

QTY STRUCTURE ID SIZE GRADE

ELEVATION

ABOVE FIELD

LEVEL FIXTURE TYPE QTY/POLE THIS
GRID
OTHER
GRIDS
2 T2-T3 40'-40'QF-900 2 0 2

26.5'QF-900 1 1 0
2 Totals 6 2 4
Above Field Level is height of fixtures above area shown Thibodo Park Tennis Basketball LED RETRO
Vista,CA
Grid Summary
Name:Basketball
Size:-40' x 71'
Spacing:10.0' x 10.0'
Height:3.0' above grade
Illumination Summary

MAINTAINED HORIZONTAL FOOTCANDLES
Entire Grid
Scan Average: 34.56
Maximum:57
Minimum:19
Avg/Min:1.79
Max/Min: 2.96
UG (adjacent pts):1.84
CU:0.55
No. of Points:28

FIXTURE INFORMATION
Applied Circuits:B
No. of Fixtures:2
Total Load:1.50 kW
Pole location(s)dimensions are relative
to 0,0 reference point(s)
Guaranteed Performance:The ILLUMINATION described aboveis guaranteed per your Musco Warranty document.

Field Measurements:Individual field measurements may varyfrom computer-calculated predictions.

Electrical System Requirements:Refer to AmperageDraw Chart and/or the "Musco Control System Summary"for electrical sizing.

Installation Requirements:Results assume ± 3%nominal voltage at line side of the driver and structureslocated within 3 feet (1m) of design locations. 10/13/2026 C10 41 of 74

ILLUMINATION SUMMARY
Not to be reproduced in whole or part without the wriƩen consent of Musco Sports LighƟng, LLC. ©1981, 2026 Musco Sports LighƟng, LLC.ENGINEERED DESIGN By: D.Lohman  File #209891A  21-Jul-26 (-27.00', 0.00', 0.00')(27.55', -0.52', 0.00')
(87
.
2 8
'
,

-
8 .
1 4
'
,

7 .
0 0
'
)

0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

0.0 0.0

0.0 0.0

0.0 0.0

0.0 0.0

0.0 0.0

0.0 0.0

0.0 0.00.00.00.0-0.00.00.00.00.00.0

0.0 0.0

0.0 0.0

0.0 0.0

0.0 0.0

0.0 0.0

0.0 0.0

0.0 0.0

0.0 0.0
T4
T1
T3
T2
SCALE IN FEET 1 : 100
0'100'200'
Equipment List For Areas Shown
Structure Fixtures

QTY STRUCTURE ID SIZE GRADE

ELEVATION

ABOVE FIELD

LEVEL FIXTURE TYPE QTY/POLE THIS
GRID
OTHER
GRIDS
1 T1 40'-40'QF-900 2 2 0
2 T2-T3 40'7'47'QF-900 2 2 0

33.5'QF-900 1 1 0
1 T4 40'-40.2'QF-900 2 2 0
4 Totals 10 10 0
Above Field Level is height of fixtures above area shown Thibodo Park Tennis Basketball LED RETRO
Vista,CA
Grid Summary
Name:Project Spill 150' Offset @ 3ft.

Spacing:30.0'
Height:3.0' above grade
Illumination Summary

INITIAL HORIZONTAL FOOTCANDLES
Entire Grid
Scan Average: 0.0000
Maximum:0.00
Minimum:0.00
CU:0.00
No. of Points:47

FIXTURE INFORMATION
Applied Circuits:A,B
No. of Fixtures:10
Total Load:8.80 kW
Pole location(s)dimensions are relative
to 0,0 reference point(s)
Guaranteed Performance:The ILLUMINATION described aboveis guaranteed per your Musco Warranty document.

Field Measurements:Individual field measurements may varyfrom computer-calculated predictions.

Electrical System Requirements:Refer to AmperageDraw Chart and/or the "Musco Control System Summary"for electrical sizing.

Installation Requirements:Results assume ± 3%nominal voltage at line side of the driver and structureslocated within 3 feet (1m) of design locations. 10/13/2026 C10 42 of 74

ILLUMINATION SUMMARY
Not to be reproduced in whole or part without the wriƩen consent of Musco Sports LighƟng, LLC. ©1981, 2026 Musco Sports LighƟng, LLC.ENGINEERED DESIGN By: D.Lohman  File #209891A  21-Jul-26 (-27.00', 0.00', 0.00')(27.55', -0.52', 0.00')
(87
.
2 8
'
,

-
8 .
1 4
'
,

7 .
0 0
'
)
0 13 0 0 6 0 0 0
0 1
0 0
0 0
0 0
0 0
1 0
0 0091031000
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
T4
T1
T3
T2
SCALE IN FEET 1 : 100
0'100'200'
Equipment List For Areas Shown
Structure Fixtures

QTY STRUCTURE ID SIZE GRADE

ELEVATION

ABOVE FIELD

LEVEL FIXTURE TYPE QTY/POLE THIS
GRID
OTHER
GRIDS
1 T1 40'-40'QF-900 2 2 0
2 T2-T3 40'7'47'QF-900 2 2 0

33.5'QF-900 1 1 0
1 T4 40'-40.2'QF-900 2 2 0
4 Totals 10 10 0
Above Field Level is height of fixtures above area shown Thibodo Park Tennis Basketball LED RETRO
Vista,CA
Grid Summary
Name:Project Spill 150' Offset @ 5ft.

Spacing:30.0'
Height:5.0' above grade
Illumination Summary

INITIAL CANDELA (PER FIXTURE)
Entire Grid
Scan Average: 0.7633
Maximum:13.10
Minimum:0.00
CU:0.00
No. of Points:47

FIXTURE INFORMATION
Applied Circuits:A,B
No. of Fixtures:10
Total Load:8.80 kW
Pole location(s)dimensions are relative
to 0,0 reference point(s)
Guaranteed Performance:The ILLUMINATION described aboveis guaranteed per your Musco Warranty document.

Field Measurements:Individual field measurements may varyfrom computer-calculated predictions.

Electrical System Requirements:Refer to AmperageDraw Chart and/or the "Musco Control System Summary"for electrical sizing.

Installation Requirements:Results assume ± 3%nominal voltage at line side of the driver and structureslocated within 3 feet (1m) of design locations. 10/13/2026 C10 43 of 74

ILLUMINATION SUMMARY
Not to be reproduced in whole or part without the wriƩen consent of Musco Sports LighƟng, LLC. ©1981, 2026 Musco Sports LighƟng, LLC.ENGINEERED DESIGN By: D.Lohman  File #209891A  21-Jul-26 (-27.00', 0.00', 0.00')(27.55', -0.52', 0.00')
(87
.
2 8
'
,

-
8 .
1 4
'
,

7 .
0 0
'
)

0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

0.0 0.0

0.0 0.0

0.0 0.0

0.0 0.0

0.0 0.0

0.0 0.0

0.0 0.00.00.00.00.00.00.00.00.00.0

0.0 0.0

0.0 0.0

0.0 0.0

0.0 0.0

0.0 0.0

0.0 0.0

0.0 0.0

0.0 0.0
T4
T1
T3
T2
SCALE IN FEET 1 : 100
0'100'200'
Equipment List For Areas Shown
Structure Fixtures

QTY STRUCTURE ID SIZE GRADE

ELEVATION

ABOVE FIELD

LEVEL FIXTURE TYPE QTY/POLE THIS
GRID
OTHER
GRIDS
1 T1 40'-40'QF-900 2 2 0
2 T2-T3 40'7'47'QF-900 2 2 0

33.5'QF-900 1 1 0
1 T4 40'-40.2'QF-900 2 2 0
4 Totals 10 10 0
Above Field Level is height of fixtures above area shown Thibodo Park Tennis Basketball LED RETRO
Vista,CA
Grid Summary
Name:Project Spill 150' Offset @ 5ft.

Spacing:30.0'
Height:5.0' above grade
Illumination Summary

INITIAL MAX VERTICAL FOOTCANDLES
Entire Grid
Scan Average: 0.0000
Maximum:0.00
Minimum:0.00
CU:0.00
No. of Points:47

FIXTURE INFORMATION
Applied Circuits:A,B
No. of Fixtures:10
Total Load:8.80 kW
Pole location(s)dimensions are relative
to 0,0 reference point(s)
Guaranteed Performance:The ILLUMINATION described aboveis guaranteed per your Musco Warranty document.

Field Measurements:Individual field measurements may varyfrom computer-calculated predictions.

Electrical System Requirements:Refer to AmperageDraw Chart and/or the "Musco Control System Summary"for electrical sizing.

Installation Requirements:Results assume ± 3%nominal voltage at line side of the driver and structureslocated within 3 feet (1m) of design locations. 10/13/2026 C10 44 of 74

EQUIPMENT LAYOUT
Not to be reproduced in whole or part without the wriƩen consent of Musco Sports LighƟng, LLC. ©1981, 2026 Musco Sports LighƟng, LLC.ENGINEERED DESIGN By: D.Lohman  File #209891A  21-Jul-26 Thibodo Park Tennis Basketball LED RETRO
Vista,CA
Tennis
1 Court - 18' Spacing
(-27.00', 0.00', 0.00')
Pickleball 1-4
56' x 116'
(27.55', -0.52', 0.00')
Basketball
-40' x 71'
(87
.
2 8
'
,

-
8 .
1 4
'
,

7 .
0 0
'
)
T4
T1
T3
T2
(0.00', 0.00', 0.00')
SCALE IN FEET 1 : 20
0'20'40'
Pole location(s)dimensions are relative
to 0,0 reference point(s)
Equipment Layout
INCLUDES:· Basketball· Pickleball 1-4· Tennis
Electrical System Requirements:Refer to AmperageDraw Chart and/or the "Musco Control System Summary"for electrical sizing.

Installation Requirements:Results assume ± 3%nominal voltage at line side of the driver and structureslocated within 3 feet (1m) of design locations.

Equipment List For Areas Shown
Structure Fixtures

QTY STRUCTURE

ID SIZE GLOBAL

ELEVATION ABOVE GLOBAL LEVEL FIXTURE TYPE QTY/POLE
1 T1 40'-40'QF-900 2
2 T2-T3 40'7'47'

33.5'
QF-900
QF-900
2 1
1 T4 40'-40.2'QF-900 2
4 Totals 10
Single Fixture Amperage Draw Chart
Driver SpeciĮcaƟons
(.90 min power factor)
Line Amperage Per Fixture
(max draw)
Single Phase Voltage 208
(60)
220
(60)
240
(60)
277
(60)
347
(60)
380
(60)
480
(60)
QF-900 5.3 5.0 4.6 4.0 3.2 2.9 2.3
*Amp draw based on 100% Įxture output, consult design speciĮc datasheet for adjusted amperage draw chart
Above Global Level is height of fixtures above design (0,0,0) 10/13/2026 C10 45 of 74

2016, 2025 Musco Sports Lighting, LLC • M-2168-enUS-20

1 of 6
QUOTE
Date: August 28, 2026 Project: Vista Sports Park Retrofit To: City of Vista Vista, CA
Musco Project Number: 211161

Sourcewell
Master Project: 199030, Contract Number: 041123-MSL, Expiration: 06/16/2027 Category: Sports lighting with related supplies and services

All purchase orders should note the following:

Sourcewell Purchase – Contract Number: 041123-MSL
Sourcewell Member Number: 28780

Quotation Price – Materials Delivered to Job Site and Installation

Baseball and Soccer:

Musco Materials: $365,800.

Installation: $144,000.

Estimated Sales tax: $ 30,180.

Project Total: $539,980.

Sales tax is estimate and based on 8.25% rate. Bonding is not included. Labor, installation, and unloading of the equipment are included. Quote is confidential. Pricing and lead times are effective for 120 days only.

CA Public Works Contractor Number: 1000004278, Electrical Contractor (C-10 License) Number: 797757

Quick-Fit® Solution with Total Light Control – TLC for LED™ Technology System Description:

Existing System Components
 Pre-cast concrete bases
 Galvanized steel poles
New System Components
 Factory-aimed QuickFitTM luminaires, including balltracker luninaries  Pole length factory assembled wire harnesses
 Factory wired and tested remote electrical component enclosures  UL listed as a complete system
Installation - QuickFitTM
 For installation the following will be provided: demo and disposal of existing fixtures and parts, labor, lift and equipment to install all LED fixtures and components. Does not include electrical conduit, wire or service, and assumes re-use of electrical on-site  Please see full Installation Scope of Work below
On Field Performance
 Guaranteed light levels to match existing
 Existing controls to be utilized for remote scheduling  Reduction of glare compared to the existing system
Control Systems and Services
 Utilizes existing Musco Control-Link® system on-site - to provide remote on/off control with 24/7 customer support
10/13/2026 C10 46 of 74

2016, 2025 Musco Sports Lighting, LLC • M-2168-enUS-20

2 of 6
QUOTE
Operation and Warranty Services
 10 year warranty that covers materials and onsite labor, eliminating 100% of your maintenance costs for 10 years
 Warranty starts the date of shipment

Payment Terms
Final payment terms to be coordinated with Musco’s credit department.

Please email a copy of the Purchase Order to:

Musco Sports Lighting, LLC
Attn: Karin Anderson
Email: [email protected]

All Purchase orders should note the following:

Sourcewell Purchase – Contract Number: 041123-MSL
Sourcewell Member Number: 28780

Delivery Timing
8 - 10 weeks for delivery of materials to the job site from the time of order, submittal approval, and confirmation of order details including voltage, phase, and pole/luminaire locations. Installation is expected to take 3-5 business days.

Notes
Quote is based on following conditions:
 Shipment of entire project together to one location.
 Structural Pole Load check is included, and is currently in progress  Structural code and wind speed = 2025 CBC, 95 mi/h, Exposure C, Importance Factor 1.0.  Installation is included- per scope of work below

Thank you for considering Musco for your lighting needs. Please contact me with any questions or if you need additional details.

Karin Anderson
Field Sales Representative
Musco Sports Lighting, LLC
Phone: 858-232-1620
E-mail: [email protected]

10/13/2026 C10 47 of 74

2016, 2025 Musco Sports Lighting, LLC • M-2168-enUS-20

3 of 6
QUOTE
Vista Sports Park
Vista, CA
QuickFit Retrofit Scope of Work

Customer Responsibilities:

1. Complete access to the site for construction using standard 2-wheel drive rubber tire equipment.

2. Locate existing underground utilities not covered by your local utilities (i.e. water lines, electrical lines, irrigation systems, and sprinkler heads). Musco or Subcontractor are not be responsible for repairs to unmarked utilities.

3. Locate and mark field reference points per Musco supplied layout (i.e. home plate, center of FB field).

4. Ensure usability of existing underground wiring.

5. Pay any necessary power company fees and requirements.

6. Pay all permitting fees.

Musco Responsibilities:

1. Provide required fixtures, electrical enclosures, mounts, hardware, wire harnesses, and control cabinets.

2. Provide fixture layout and aiming diagram.

3. Provide Contract Management as required.

4. Assist our installing subcontractor and ensure all project responsibilities are satisfied.

Subcontractor Responsibilities
General:

1. Obtain any required permitting.

2. Contact the facility owner/manager to confirm the existing private underground utilities and irrigation systems have been located and are clearly marked to avoid damage from construction equipment. Notify owner and Musco regarding damage which occurred to unmarked utilities.

3. Provide labor, equipment, and materials to offload equipment at jobsite per scheduled delivery.

4. Provide storage containers for material, (including electrical components enclosures), as needed.

5. Provide necessary waste disposal and daily cleanup.

6. Provide adequate security to protect Musco delivered products from theft, vandalism, or damage during the installation.

7. Keep all heavy equipment off playing fields when possible. Repair damage to grounds which exceeds that which would be expected. Indentations caused by heavy equipment traveling over dry ground would be an example of expected damage. Ruts and sod damage caused by equipment traveling over wet grounds would be an example of damage requiring repair.

8. Provide startup and aiming as required to provide complete and operating sports lighting system.

9. Installation to commence upon delivery and proceed without interruption until complete. Musco to be immediately notified of any breaks in schedule or delays.

10. Complete and submit Musco provided closeout checklist including required pictures. 10/13/2026 C10 48 of 74

2016, 2025 Musco Sports Lighting, LLC • M-2168-enUS-20

4 of 6
QUOTE
Demolition:

1. Remove and dispose of the existing fixtures, and electrical enclosures, parts. This will include the recycling of lamps, aluminum reflectors, ballast, and steel, as necessary.

2. Leave existing ground wires and power feed in place for connection to new lighting equipment.

Retrofit Musco Equipment to Existing Poles:

1. Provide labor, materials, and equipment to assemble and install Musco QuickFit equipment on existing poles and terminate grounding and power feed. Power feed may need to be reworked to adapt to the new Musco equipment.

2. Ensure grounding components meet minimum standards required by NEC and NFPA780.

3. Ensure all Musco components are bonded to both equipment and lightning grounds. No upward sweeps allowed for lightning down conductor or bonding jumper(s). See installation instructions for further information.

4. Test ground resistance with 3-point ground resistance test, using instructions provided. Confirm 25 ohms or less for each pole. Install additional ground rods or create grounding grid until resistance of 25 ohms or less is achieved. Record all results on form provided and submit readings to Musco.

Electrical:

1. Provide materials, and equipment to reuse existing electrical service panels as required.

2. Provide materials, and equipment to reuse existing electrical wiring as permitted.

3. Provide materials, and equipment to reuse existing Control Link cabinet.

4. Complete required insulation resistance tests on all current-carrying conductors per ANSI/NETA ATS-2021.
a. Use the instructions and forms provided by Musco to provide test results to your Musco contact. Note conduits must be full of water prior to testing. b. Any new conductors with resistance values less than (<) 100 MΩ - phase to ground - must be repaired or replaced to meet the standard.
c. Any existing conductors with resistance values less than (<) 100 MΩ - phase to ground – must be reported to your local Musco representative.

10/13/2026 C10 49 of 74

2016, 2025 Musco Sports Lighting, LLC • M-2168-enUS-20

5 of 6
QUOTE

CODE OF CONDUCT

In order to maintain a high-quality jobsite and installation, Subcontractor represents to Musco that it has the supervision necessary to, and shall train, manage, supervise, monitor, and inspect the activities of its employees for the purpose of enforcing compliance with these safety requirements. Subcontractor acknowledges that Musco does not undertake any duty toward Subcontractor’s employees to train, manage, supervise, monitor, and inspect their work activities for the purpose of enforcing compliance with these safety requirements, but Subcontractor agrees to abide by any reasonable recommendations made by Musco or Musco representatives with respect to safety.

Subcontractor agrees that it is or will be familiar with and shall abide by the safety rules and regulations of Musco and the Owner, including, but not limited to the Occupational Safety and Health Act of 1970 (OSHA), all rules and regulations established pursuant thereto, and all amendments and supplements thereto.

Subcontractor further agrees to require all its employees, subcontractors, and suppliers to comply with these requirements. Subcontractor shall also observe and comply with all laws with respect to environmental protection applicable to the Project.

Subcontractor shall require all its subcontractors, employees, visitors, suppliers, and agents under its direction to comply with the following:

1. GENERAL JOBSITE SAFETY AND CLEANLINESS.
a. Subcontractor’s employees and agents shall be required to wear appropriate personal protective equipment including, but not limited to, safety glasses with side shields, work shoes, fall protection devices, and hard hats.
b. Where a walking or working surface has an unprotected side or edge which is six feet or more above a lower level, Subcontractor shall use guardrail systems, safety net systems, or personal fall arrest systems.
c. Jobsite shall be kept free of debris including, but not limited to, cardboard and packing materials which can become windborne.
d. Construction equipment shall be parked during non-use in an orderly fashion so as not to create inconvenience to others using the jobsite.
e. Subcontractor shall provide for and ensure the use of safety equipment for the Project in accordance with Musco’s and Owner’s safety requirements, to the extent these may be stricter than federal, state, or local standards, or generally recognized industry applicable standards. f. Subcontractor shall provide the Musco project manager with an “Emergency List” showing Subcontractor’s designated medical doctor, hospital, insurance company, and any other health service providers, such list to be updated within 24 hours of any change in the information provided.
g. Within eight (8) hours from the time of an accident (or such shorter period as laws may require), Subcontractor shall advise Musco of any accident resulting in injury to any person or damage to any equipment or facility. Upon request, Subcontractor shall promptly furnish Musco with a written report of any such accident as well as a copy of all insurance and worker’s compensation claims involving the Project.
10/13/2026 C10 50 of 74

2016, 2025 Musco Sports Lighting, LLC • M-2168-enUS-20

6 of 6
QUOTE
h. Subcontractor shall maintain and inspect all construction equipment, including cranes and other lifting equipment, prior to each use. Subcontractor warrants that all equipment operators shall be qualified for each piece of construction equipment they intend to operate. Documentation of specific training is the responsibility of the Subcontractor. i. Jobsite shall be policed daily for compliance to the above conditions. j. Subcontractor’s employees and agents are prohibited from using drugs and alcohol on the Project property or being under the influence of alcohol or drugs while performing work on the Project. Anyone observed participating in or observed under the influence will be removed from the Project immediately and prohibited from returning, with no exceptions.

2. CONFORMANCE TO STANDARD MUSCO INSTALLATION GUIDELINES. a. Review and understand installation instructions are provided with every product installation. b. Education of installation personnel to allow for highest efficiency and lowest possibility of failure.
c. Verify that components have been assembled per Musco installation instructions. d. Verify plumb of concrete foundations prior to standing of poles.

3. PROVIDING A QUALITY INSTALLATION TEAM.
a. Subcontractor’s work directly reflects the quality of the installation and may indirectly relate to the quality of the product upon which Musco’s reputation is built. b. Provide and maintain quality installation equipment. Records of maintenance and/or calibration shall be provided upon request.
c. Personnel shall be knowledgeable in operation of equipment as well as installation of Musco product.
d. All personnel provided by Subcontractor shall understand the relationship developed by and between Subcontractor and Musco, also by and between Musco and the customer, and act accordingly.

10/13/2026 C10 51 of 74

Vista Sports Park LED Retrofit
Vista,CA
Sales Representative: Karin Anderson · Designed By: D.Lohman · Design No.: 211161A · July 17, 2026 Not to be reproduced in whole or part without the written consent of Musco Lighting. ©1981, 2026 Musco Sports Lighting, LLC.

Sports Illustrated Stadium, Harrison, New Jersey, USA UBS Arena, Elmont, New York, USA Tottenham Hotspur FC Training Ground, Tottenham, London, UKIowa Women of Achievement Bridge, Des Moines, Iowa, USA 10/13/2026 C10 52 of 74

PROJECT SUMMARY
Not to be reproduced in whole or part without the wriƩen consent of Musco Sports LighƟng, LLC. ©1981, 2026 Musco Sports LighƟng, LLC.ENGINEERED DESIGN By: D.Lohman  File #211161A  17-Jul-26 Vista Sports Park LED Retrofit
Vista,CA

LIGHTING SYSTEM
Structure/Fixture Summary
Structure ID Structure Height Fixt. Attachment Ht.Fixture Qty Fixture Type Load Circuit A1 70'70'5 QF-900 4.58 kW A
16'1 TLC-BT-575 0.57 kW A
A2 80'80'5 QF-900 4.58 kW A
80'7 QF-900 6.41 kW D
16'1 TLC-BT-575 0.57 kW A
16'2 TLC-BT-575 1.15 kW D
A3-A4 60'60'1 QF-900 0.75 kW B
60'2 QF-900 1.83 kW B
16'1 TLC-BT-575 0.57 kW B
A5-A6 60'60'1 QF-900 0.75 kW C
60'2 QF-900 1.83 kW C
16'1 TLC-BT-575 0.57 kW C
B1 90'90'10 QF-900 9.15 kW A
90'4 QF-900 3.66 kW B
90'1 QF-900 0.75 kW A
15'1 TLC-BT-575 0.57 kW B
15'1 TLC-BT-575 0.57 kW A
B2 90'90'10 QF-900 9.15 kW A
90'1 QF-900 0.75 kW A
16'1 TLC-BT-575 0.57 kW A
B3 60'60'4 QF-900 3.66 kW B
60'4 QF-900 3.66 kW C
16'1 TLC-BT-575 0.57 kW B
16'1 TLC-BT-575 0.57 kW C
B4 60'60'4 QF-900 3.66 kW C
16'1 TLC-BT-575 0.57 kW C
C1-C2 70'70'6 QF-900 5.49 kW A
16'2 TLC-BT-575 1.15 kW A
C3-C4 60'60'3 QF-900 2.75 kW B
16'1 TLC-BT-575 0.57 kW B
C5-C6 60'60'2 QF-900 1.83 kW C
60'1 QF-900 0.75 kW C
16'1 TLC-BT-575 0.57 kW C
S1 70'70'7 QF-900 6.41 kW D
16'2 TLC-BT-575 1.15 kW D
S2 90'90'8 QF-900 7.32 kW D
90'8 QF-900 7.32 kW E
16'2 TLC-BT-575 1.15 kW E
16'2 TLC-BT-575 1.15 kW D
S3-S4 70'70'6 QF-900 5.49 kW E
70'1 QF-900 0.75 kW E
16'2 TLC-BT-575 1.15 kW E
S5 80'80'8 QF-900 7.32 kW D
80'8 QF-900 7.32 kW E
16'2 TLC-BT-575 1.15 kW E
16'2 TLC-BT-575 1.15 kW D
21 180 150.81 kW
Circuit Summary
Circuit Description Load Fixture Qty
A Baseball 44.53 kW 52
B Softball 1 21.42 kW 26
C Softball 2 21.09 kW 26
D Soccer 1 32.05 kW 38
E Soccer 2 31.72 kW 38
Fixture Type Summary
Type Circuit Source Wattage Lumens L90 L80 L70 Quantity QF-900 A LED 5700K - 75 CRI 750W 89,000 ------2
QF-900 A LED 5700K - 75 CRI 915W 117,000 ------42
QF-900 B LED 5700K - 75 CRI 750W 89,000 ------2
QF-900 B LED 5700K - 75 CRI 915W 117,000 ------18
QF-900 C LED 5700K - 75 CRI 750W 89,000 ------4
QF-900 C LED 5700K - 75 CRI 915W 117,000 ------16
QF-900 D LED 5700K - 75 CRI 915W 117,000 ------30
QF-900 E LED 5700K - 75 CRI 750W 89,000 ------2
QF-900 E LED 5700K - 75 CRI 915W 117,000 ------28
TLC-BT-575 A LED 5700K - 75 CRI 575W 52,000 >120,000 >120,000 >120,000 8 TLC-BT-575 B LED 5700K - 75 CRI 575W 52,000 >120,000 >120,000 >120,000 6 TLC-BT-575 C LED 5700K - 75 CRI 575W 52,000 >120,000 >120,000 >120,000 6 TLC-BT-575 D LED 5700K - 75 CRI 575W 52,000 >120,000 >120,000 >120,000 8 TLC-BT-575 E LED 5700K - 75 CRI 575W 52,000 >120,000 >120,000 >120,000 8 Guaranteed Performance:The ILLUMINATION described aboveis guaranteed per your Musco Warranty document.

Field Measurements:Individual field measurements may varyfrom computer-calculated predictions.

Electrical System Requirements:Refer to AmperageDraw Chart and/or the "Musco Control System Summary"for electrical sizing.

Installation Requirements:Results assume ± 3%nominal voltage at line side of the driver and structureslocated within 3 feet (1m) of design locations. 10/13/2026 C10 53 of 74

PROJECT SUMMARY
Not to be reproduced in whole or part without the wriƩen consent of Musco Sports LighƟng, LLC. ©1981, 2026 Musco Sports LighƟng, LLC.ENGINEERED DESIGN By: D.Lohman  File #211161A  17-Jul-26 Vista Sports Park LED Retrofit
Vista,CA
Single Fixture Amperage Draw Chart
Driver SpeciĮcaƟons
(.90 min power factor)
Line Amperage Per Fixture
(max draw)
Single Phase Voltage 208
(60)
220
(60)
240
(60)
277
(60)
347
(60)
380
(60)
480
(60)
QF-900 5.3 5.0 4.6 4.0 3.2 2.9 2.3
TLC-BT-575 3.3 3.2 2.9 2.5 2.0 1.8 1.5
Light Level Summary
Calculation Grid Summary
Grid Name Calculation Metric Illumination Ave Circuits Fixture QtyAveMinMaxMax/Min Ave/Min Baseball (Infield)Horizontal Illuminance 50.33 39 64 1.64 1.29 A 52 Baseball (Outfield)Horizontal Illuminance 30.16 19 44 2.26 1.56 A 52 Football 1 Horizontal Illuminance 34.53 26 45 1.76 1.35 D 38 Football 2 Horizontal Illuminance 33.11 22 47 2.14 1.50 E 38 Project Spill 150' Offset @ 3ft.Horizontal Illuminance 0.0319 0.00 0.16 282.444 55.748 A,B,C,D,E 180 Project Spill 150' Offset @ 5ft.Max Candela Metric 2576.7253 183.00 9914.18 54.175 14.080 A,B,C,D,E 180 Project Spill 150' Offset @ 5ft.Max Vertical Illuminance Metric 0.0788 0.00 0.36 343.385 75.320 A,B,C,D,E 180 Soccer 1 Horizontal Illuminance 34.67 27 46 1.74 1.31 D 38 Soccer 2 Horizontal Illuminance 33.56 27 46 1.73 1.26 E 38 Softball 1 (Infield)Horizontal Illuminance 58.30 45 71 1.59 1.30 B 26 Softball 1 (Outfield)Horizontal Illuminance 36.24 25 47 1.86 1.43 B 26 Softball 2 (Infield)Horizontal Illuminance 54.03 41 63 1.52 1.30 C 26 Softball 2 (Outfield)Horizontal Illuminance 35.29 20 45 2.18 1.73 C 26 Guaranteed Performance:The ILLUMINATION described aboveis guaranteed per your Musco Warranty document.

Field Measurements:Individual field measurements may varyfrom computer-calculated predictions.

Electrical System Requirements:Refer to AmperageDraw Chart and/or the "Musco Control System Summary"for electrical sizing.

Installation Requirements:Results assume ± 3%nominal voltage at line side of the driver and structureslocated within 3 feet (1m) of design locations. 10/13/2026 C10 54 of 74

ILLUMINATION SUMMARY
Not to be reproduced in whole or part without the wriƩen consent of Musco Sports LighƟng, LLC. ©1981, 2026 Musco Sports LighƟng, LLC.ENGINEERED DESIGN By: D.Lohman  File #211161A  17-Jul-26 C1
C2
A1
B2
50 63
49 55
51 29
26 26
56 60
50 57
64 44
31 29
26 25
26 21
41 45
50 58
58 43
34 33
30 26
24 21
41 42
50 51
47 38
34 35
36 28
22 39
44 49
48 40
33 31
34 37
34 30
36 43
44 41
35 29
27 28
30 28
29 29
40 38
36 32
27 23
23 26
27 24
31 37
35 34
31 27
23 23
25 27
30 32
35 35
31 28
25 24
22 26
29 33
39 40
30 27
26 26
25 26
22 38
39 35
31 29
26 29
28 22
29 34
30 20
19 B1
A2
31 7
'
124'
12 1
'
333'
77 '
56'
25 '
199'
17 9
'
49'
54 '
76'
10 20 30 40
50 50
40 40
30 30
20 20
10 10
SCALE IN FEET 1 : 80
0'80'160'
Equipment List For Areas Shown
Structure Fixtures

QTY STRUCTURE ID SIZE GRADE

ELEVATION

ABOVE FIELD

LEVEL FIXTURE TYPE QTY/POLE THIS
GRID
OTHER
GRIDS
1 A1 70'5'74.6'QF-900 5 5 0

20.1'TLC-BT-575 1 1 0
1 A2 80'5'84.7'QF-900 5/7*5 7

20.2'TLC-BT-575 3 1 2
1 B1 90'5'94.7'QF-900 11/4*11 4

19.7'TLC-BT-575 2 1 1
1 B2 90'-90'QF-900 11 11 0

15.5'TLC-BT-575 1 1 0
1 C1 70'-2'67.6'QF-900 6 6 0

13.1'TLC-BT-575 2 2 0
1 C2 70'-1'69.3'QF-900 6 6 0

14.7'TLC-BT-575 2 2 0
6 Totals 66 52 14
*This structure utilizes a back-to-back mounting configuration Above Field Level is height of fixtures above area shown Vista Sports Park LED Retrofit
Vista,CA
Grid Summary
Name:Baseball
Size:Irregular 324'/388'/343'
Spacing:30.0' x 30.0'
Height:3.0' above grade
Illumination Summary

MAINTAINED HORIZONTAL FOOTCANDLES
Infield Outfield
Scan Average: 50.33 30.16
Maximum:64 44
Minimum:39 19
Avg/Min:1.29 1.56
Max/Min: 1.64 2.26
UG (adjacent pts):1.38 1.53
CU:0.70
No. of Points:25 96

FIXTURE INFORMATION
Applied Circuits:A
No. of Fixtures:52
Total Load:44.53 kW
Pole location(s)dimensions are relative
to 0,0 reference point(s)
Guaranteed Performance:The ILLUMINATION described aboveis guaranteed per your Musco Warranty document.

Field Measurements:Individual field measurements may varyfrom computer-calculated predictions.

Electrical System Requirements:Refer to AmperageDraw Chart and/or the "Musco Control System Summary"for electrical sizing.

Installation Requirements:Results assume ± 3%nominal voltage at line side of the driver and structureslocated within 3 feet (1m) of design locations. 10/13/2026 C10 55 of 74

ILLUMINATION SUMMARY
Not to be reproduced in whole or part without the wriƩen consent of Musco Sports LighƟng, LLC. ©1981, 2026 Musco Sports LighƟng, LLC.ENGINEERED DESIGN By: D.Lohman  File #211161A  17-Jul-26 C4
A4
A3
C3
66 62
58 57
46 42
41 39
65 68
64 61
48 45
41 41
43 43
28 63
68 71
62 53
46 41
41 38
39 29
57 65
66 58
49 43
42 38
34 36
29 46
51 56
52 45
38 37
35 34
36 42
45 47
46 40
34 33
34 33
32 37
38 42
44 39
33 32
35 31
31 35
38 39
37 32
31 32
31 39
36 33
32 30
28 38
34 32
33 29
26 26
25 B3
70'
19 4
'
33'
43 '
41'
33 '119'
38 '
194'
70 '
39'
97 '
B1
SCALE IN FEET 1 : 50
0'50'100'
Equipment List For Areas Shown
Structure Fixtures

QTY STRUCTURE ID SIZE GRADE

ELEVATION

ABOVE FIELD

LEVEL FIXTURE TYPE QTY/POLE THIS
GRID
OTHER
GRIDS
4 A3-A4
C3-C4 60'-60'QF-900 3 3 0

15.5'TLC-BT-575 1 1 0
1 B1 90'-2'87.7'QF-900 11/4*4 11

12.7'TLC-BT-575 2 1 1
1 B3 60'-60'QF-900 4/4*4 4

15.5'TLC-BT-575 2 1 1
6 Totals 43 26 17
*This structure utilizes a back-to-back mounting configuration Above Field Level is height of fixtures above area shown Vista Sports Park LED Retrofit
Vista,CA
Grid Summary
Name:Softball 1
Size:200'/200'/200' - basepath 70'
Spacing:20.0' x 20.0'
Height:3.0' above grade
Illumination Summary

MAINTAINED HORIZONTAL FOOTCANDLES
Infield Outfield
Scan Average: 58.30 36.24
Maximum:71 47
Minimum:45 25
Avg/Min:1.30 1.43
Max/Min: 1.59 1.86
UG (adjacent pts):1.27 1.50
CU:0.61
No. of Points:25 68

FIXTURE INFORMATION
Applied Circuits:B
No. of Fixtures:26
Total Load:21.42 kW
Pole location(s)dimensions are relative
to 0,0 reference point(s)
Guaranteed Performance:The ILLUMINATION described aboveis guaranteed per your Musco Warranty document.

Field Measurements:Individual field measurements may varyfrom computer-calculated predictions.

Electrical System Requirements:Refer to AmperageDraw Chart and/or the "Musco Control System Summary"for electrical sizing.

Installation Requirements:Results assume ± 3%nominal voltage at line side of the driver and structureslocated within 3 feet (1m) of design locations. 10/13/2026 C10 56 of 74

ILLUMINATION SUMMARY
Not to be reproduced in whole or part without the wriƩen consent of Musco Sports LighƟng, LLC. ©1981, 2026 Musco Sports LighƟng, LLC.ENGINEERED DESIGN By: D.Lohman  File #211161A  17-Jul-26 A5
C6
C5
B4
A6
60 62
63 57
44 42
40 32
57 61
63 58
50 44
38 36
36 28
20 53
54 61
58 50
42 37
35 37
36 28
51 53
59 56
49 41
36 32
33 37
28 47
48 48
47 41
37 34
31 30
29 42
45 42
39 37
33 32
31 33
26 37
37 38
39 37
34 31
29 26
35 38
42 40
38 36
31 25
42 44
41 37
39 31
42 43
37 31
32 34
31 26
88'
36'
175
'
103
'
34'
42'
56'148
'
103
'
175
'
43'33'
B3
SCALE IN FEET 1 : 50
0'50'100'
Equipment List For Areas Shown
Structure Fixtures

QTY STRUCTURE ID SIZE GRADE

ELEVATION

ABOVE FIELD

LEVEL FIXTURE TYPE QTY/POLE THIS
GRID
OTHER
GRIDS
4 A5-A6
C5-C6 60'-60'QF-900 3 3 0

15.5'TLC-BT-575 1 1 0
1 B3 60'-60'QF-900 4/4*4 4

15.5'TLC-BT-575 2 1 1
1 B4 60'-60'QF-900 4 4 0

15.5'TLC-BT-575 1 1 0
6 Totals 31 26 5
*This structure utilizes a back-to-back mounting configuration Above Field Level is height of fixtures above area shown Vista Sports Park LED Retrofit
Vista,CA
Grid Summary
Name:Softball 2
Size:200'/200'/200' - basepath 70'
Spacing:20.0' x 20.0'
Height:3.0' above grade
Illumination Summary

MAINTAINED HORIZONTAL FOOTCANDLES
Infield Outfield
Scan Average: 54.03 35.29
Maximum:63 45
Minimum:41 20
Avg/Min:1.30 1.73
Max/Min: 1.52 2.18
UG (adjacent pts):1.28 1.46
CU:0.59
No. of Points:25 67

FIXTURE INFORMATION
Applied Circuits:C
No. of Fixtures:26
Total Load:21.09 kW
Pole location(s)dimensions are relative
to 0,0 reference point(s)
Guaranteed Performance:The ILLUMINATION described aboveis guaranteed per your Musco Warranty document.

Field Measurements:Individual field measurements may varyfrom computer-calculated predictions.

Electrical System Requirements:Refer to AmperageDraw Chart and/or the "Musco Control System Summary"for electrical sizing.

Installation Requirements:Results assume ± 3%nominal voltage at line side of the driver and structureslocated within 3 feet (1m) of design locations. 10/13/2026 C10 57 of 74

ILLUMINATION SUMMARY
Not to be reproduced in whole or part without the wriƩen consent of Musco Sports LighƟng, LLC. ©1981, 2026 Musco Sports LighƟng, LLC.ENGINEERED DESIGN By: D.Lohman  File #211161A  17-Jul-26 30 30
35 34
33 35
29 36
37 38
36 37
34 28
42 38
35 36
41 39
28 39
34 31
34 43
46 34
31 30
28 31
39 46
38 28
29 27
29 36
41 33
31 30
28 29
35 41
33 36
35 31
32 37
41 31
39 39
36 35
38 35
30 33
38 40
38 40
35 30
27 29
34 35
36 39
34 S1
S5
S2
12 5
'
117'
13 6
'
101'
11 5
'
198'
11 5
'
200'
A2
10 10
20 20
30 30
40 40
50 50
40 40
30 30
20 20
10 10
10 20 30 40 50 40 30
20 20
10 10
SCALE IN FEET 1 : 60
0'60'120'
Equipment List For Areas Shown
Structure Fixtures

QTY STRUCTURE ID SIZE GRADE

ELEVATION

ABOVE FIELD

LEVEL FIXTURE TYPE QTY/POLE THIS
GRID
OTHER
GRIDS
1 A2 80'-2'77.7'QF-900 5/7*7 5

13.2'TLC-BT-575 3 2 1
1 S1 70'-2'67.6'QF-900 7 7 0

13.1'TLC-BT-575 2 2 0
1 S2 90'-3'87.4'QF-900 16 8 8

12.9'TLC-BT-575 4 2 2
1 S5 80'-80'QF-900 16 8 8

15.5'TLC-BT-575 4 2 2
4 Totals 64 38 26
*This structure utilizes a back-to-back mounting configuration Above Field Level is height of fixtures above area shown Vista Sports Park LED Retrofit
Vista,CA
Grid Summary
Name:Soccer 1
Size:345' x 210'
Spacing:30.0' x 30.0'
Height:3.0' above grade
Illumination Summary

MAINTAINED HORIZONTAL FOOTCANDLES
Entire Grid
Scan Average: 34.67
Maximum:46
Minimum:27
Avg/Min:1.31
Max/Min: 1.74
UG (adjacent pts):1.39
CU:0.62
No. of Points:77

FIXTURE INFORMATION
Applied Circuits:D
No. of Fixtures:38
Total Load:32.05 kW
Pole location(s)dimensions are relative
to 0,0 reference point(s)
Guaranteed Performance:The ILLUMINATION described aboveis guaranteed per your Musco Warranty document.

Field Measurements:Individual field measurements may varyfrom computer-calculated predictions.

Electrical System Requirements:Refer to AmperageDraw Chart and/or the "Musco Control System Summary"for electrical sizing.

Installation Requirements:Results assume ± 3%nominal voltage at line side of the driver and structureslocated within 3 feet (1m) of design locations. 10/13/2026 C10 58 of 74

ILLUMINATION SUMMARY
Not to be reproduced in whole or part without the wriƩen consent of Musco Sports LighƟng, LLC. ©1981, 2026 Musco Sports LighƟng, LLC.ENGINEERED DESIGN By: D.Lohman  File #211161A  17-Jul-26 10 10
20 20
30 30
40 40
50 50
40 40
30 30
20 20
10 10
28 29
31 28
28 26
32 36
37 35
35 33
40 38
37 37
38 31
40 34
34 38
45 38
34 30
31 36
45 45
31 28
28 33
41 42
31 28
27 32
38 39
34 30
29 33
40 39
39 35
33 35
39 34
39 39
38 38
37 31
31 36
38 38
38 37
26 26
29 29
33 35
12 5
'
117'
13 6
'
101'
11 5
'
198'
11 5
'
200'
S1
A2
S5
S2
10 20 30 40 50 40 30
20 20
10 10
SCALE IN FEET 1 : 60
0'60'120'
Equipment List For Areas Shown
Structure Fixtures

QTY STRUCTURE ID SIZE GRADE

ELEVATION

ABOVE FIELD

LEVEL FIXTURE TYPE QTY/POLE THIS
GRID
OTHER
GRIDS
1 A2 80'-2'77.7'QF-900 5/7*7 5

13.2'TLC-BT-575 3 2 1
1 S1 70'-2'67.6'QF-900 7 7 0

13.1'TLC-BT-575 2 2 0
1 S2 90'-3'87.4'QF-900 16 8 8

12.9'TLC-BT-575 4 2 2
1 S5 80'-80'QF-900 16 8 8

15.5'TLC-BT-575 4 2 2
4 Totals 64 38 26
*This structure utilizes a back-to-back mounting configuration Above Field Level is height of fixtures above area shown Vista Sports Park LED Retrofit
Vista,CA
Grid Summary
Name:Football 1
Size:360' x 160'
Spacing:30.0' x 30.0'
Height:3.0' above grade
Illumination Summary

MAINTAINED HORIZONTAL FOOTCANDLES
Entire Grid
Scan Average: 34.53
Maximum:45
Minimum:26
Avg/Min:1.35
Max/Min: 1.76
UG (adjacent pts):1.40
CU:0.58
No. of Points:72

FIXTURE INFORMATION
Applied Circuits:D
No. of Fixtures:38
Total Load:32.05 kW
Pole location(s)dimensions are relative
to 0,0 reference point(s)
Guaranteed Performance:The ILLUMINATION described aboveis guaranteed per your Musco Warranty document.

Field Measurements:Individual field measurements may varyfrom computer-calculated predictions.

Electrical System Requirements:Refer to AmperageDraw Chart and/or the "Musco Control System Summary"for electrical sizing.

Installation Requirements:Results assume ± 3%nominal voltage at line side of the driver and structureslocated within 3 feet (1m) of design locations. 10/13/2026 C10 59 of 74

ILLUMINATION SUMMARY
Not to be reproduced in whole or part without the wriƩen consent of Musco Sports LighƟng, LLC. ©1981, 2026 Musco Sports LighƟng, LLC.ENGINEERED DESIGN By: D.Lohman  File #211161A  17-Jul-26 10 10
20 20
30 30
40 50 40 30 20 10
34 34
29 30
32 31
32 29
30 30
33 38
42 38
34 32
34 35
39 44
44 27
33 34
32 34
38 40
27 33
30 29
29 31
33 27
32 30
27 27
30 30
29 36
32 30
30 31
31 29
36 36
34 36
38 38
31 35
35 38
43 46
42 27
32 31
35 43
46 37
37 38
29 27
31 32
29 S4
S3
12 0
'
124'
11 5
'
117'
11 5
'
194'
11 5
'
203'
S5
S2
10 10
20 20
30 30
40 40
50 50
40 40
30 30
20 20
10 10
SCALE IN FEET 1 : 60
0'60'120'
Equipment List For Areas Shown
Structure Fixtures

QTY STRUCTURE ID SIZE GRADE

ELEVATION

ABOVE FIELD

LEVEL FIXTURE TYPE QTY/POLE THIS
GRID
OTHER
GRIDS
1 S2 90'-3'87.4'QF-900 16 8 8

12.9'TLC-BT-575 4 2 2
2 S3-S4 70'-70'QF-900 7 7 0

15.5'TLC-BT-575 2 2 0
1 S5 80'-80'QF-900 16 8 8

15.5'TLC-BT-575 4 2 2
4 Totals 58 38 20
Above Field Level is height of fixtures above area shown Vista Sports Park LED Retrofit
Vista,CA
Grid Summary
Name:Soccer 2
Size:345' x 210'
Spacing:30.0' x 30.0'
Height:3.0' above grade
Illumination Summary

MAINTAINED HORIZONTAL FOOTCANDLES
Entire Grid
Scan Average: 33.56
Maximum:46
Minimum:27
Avg/Min:1.26
Max/Min: 1.73
UG (adjacent pts):1.41
CU:0.62
No. of Points:77

FIXTURE INFORMATION
Applied Circuits:E
No. of Fixtures:38
Total Load:31.72 kW
Pole location(s)dimensions are relative
to 0,0 reference point(s)
Guaranteed Performance:The ILLUMINATION described aboveis guaranteed per your Musco Warranty document.

Field Measurements:Individual field measurements may varyfrom computer-calculated predictions.

Electrical System Requirements:Refer to AmperageDraw Chart and/or the "Musco Control System Summary"for electrical sizing.

Installation Requirements:Results assume ± 3%nominal voltage at line side of the driver and structureslocated within 3 feet (1m) of design locations. 10/13/2026 C10 60 of 74

ILLUMINATION SUMMARY
Not to be reproduced in whole or part without the wriƩen consent of Musco Sports LighƟng, LLC. ©1981, 2026 Musco Sports LighƟng, LLC.ENGINEERED DESIGN By: D.Lohman  File #211161A  17-Jul-26 10 10
20 20
30 30
40 50 40 30 20 10
10 10
20 20
30 30
40 40
50 50
40 40
30 30
20 20
10 10
37 28
24 25
25 28
31 30
30 34
37 36
34 31
33 36
43 44
31 35
34 34
39 43
32 33
31 30
32 35
31 32
28 27
28 31
32 33
29 28
29 31
35 35
33 32
33 34
33 35
35 37
42 42
31 34
35 41
47 45
36 31
29 34
40 37
36 28
22 22
24 26
12 0
'
124'
11 5
'
117'
11 5
'
194'
11 5
'
203'
S4
S3
S5
S2
SCALE IN FEET 1 : 60
0'60'120'
Equipment List For Areas Shown
Structure Fixtures

QTY STRUCTURE ID SIZE GRADE

ELEVATION

ABOVE FIELD

LEVEL FIXTURE TYPE QTY/POLE THIS
GRID
OTHER
GRIDS
1 S2 90'-3'87.4'QF-900 16 8 8

12.9'TLC-BT-575 4 2 2
2 S3-S4 70'-70'QF-900 7 7 0

15.5'TLC-BT-575 2 2 0
1 S5 80'-80'QF-900 16 8 8

15.5'TLC-BT-575 4 2 2
4 Totals 58 38 20
Above Field Level is height of fixtures above area shown Vista Sports Park LED Retrofit
Vista,CA
Grid Summary
Name:Football 2
Size:360' x 160'
Spacing:30.0' x 30.0'
Height:3.0' above grade
Illumination Summary

MAINTAINED HORIZONTAL FOOTCANDLES
Entire Grid
Scan Average: 33.11
Maximum:47
Minimum:22
Avg/Min:1.50
Max/Min: 2.14
UG (adjacent pts):1.69
CU:0.57
No. of Points:72

FIXTURE INFORMATION
Applied Circuits:E
No. of Fixtures:38
Total Load:31.72 kW
Pole location(s)dimensions are relative
to 0,0 reference point(s)
Guaranteed Performance:The ILLUMINATION described aboveis guaranteed per your Musco Warranty document.

Field Measurements:Individual field measurements may varyfrom computer-calculated predictions.

Electrical System Requirements:Refer to AmperageDraw Chart and/or the "Musco Control System Summary"for electrical sizing.

Installation Requirements:Results assume ± 3%nominal voltage at line side of the driver and structureslocated within 3 feet (1m) of design locations. 10/13/2026 C10 61 of 74

ILLUMINATION SUMMARY
Not to be reproduced in whole or part without the wriƩen consent of Musco Sports LighƟng, LLC. ©1981, 2026 Musco Sports LighƟng, LLC.ENGINEERED DESIGN By: D.Lohman  File #211161A  17-Jul-26 C1
C2
A1
B2
B1
A2
(0.00', 0.00', -7.00')
C4
A4
A3
C3
B3
(-1
2 4
.
0 0
'
,

1 0
6 .
3 7
'
,

-
0 .
0 2
'
)
A5
C6
C5
B4
A6
(-18
6 .
1 8
'
,

-
2 5
.
5 2
'
,

0 .
0 0
'
)
S1
S5
S2
(197.98', -171.
5 8
'
,

-
0 .
0 2
'
)
10 10
20 20
30 30
40 40
50 50
40 40
30 30
20 20
10 10
(197.98', -171.
5 8
'
,

0 .
0 0
'
)
S4
S3
(232.00', -399.
0 0
'
,

-
0 .
0 2
'
)
10 10
20 20
30 30
40 40
50 50
40 40
30 30
20 20
10 10
(232.00', -399.
0 0
'
,

0 .
0 0
'
)

0.1 0.2

0.1 0.1

0.0 0.0

0.0 0.0

0.0 0.1

0.1 0.1

0.1 0.0

0.0 0.0

0.0 0.0

0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0

0.0 0.0

0.0 0.0

0.0 0.0

0.0 0.0

0.1 0.1

0.1 0.0

0.0 0.0

0.1 0.1

0.1 0.2

0.1 0.1

0.1 0.0

0.0 0.0

0.0 0.0

0.0 0.0

0.0 0.1

0.1 0.1

0.1 0.1

0.1 0.1

0.0 0.00.00.10.10.00.00.00.00.00.00.00.00.0

0.00.00.00.00.00.00.0 0.0

0.0 0.0

0.0 0.0

0.0 0.0

0.0 0.0

0.0 0.0

0.0 0.0

0.0 0.0

0.0 0.0

0.0 0.0

0.0 0.0

0.0 0.0

0.0 0.0

0.0 0.0

0.0 0.0

0.0 0.0 0.0 0.0 0.0

0.0 0.0

0.0 0.0

0.1 0.1
SCALE IN FEET 1 : 200
0'200'400'
Equipment List For Areas Shown
Structure Fixtures

QTY STRUCTURE ID SIZE GRADE

ELEVATION

ABOVE FIELD

LEVEL FIXTURE TYPE QTY/POLE THIS
GRID
OTHER
GRIDS
1 A1 70'-2'67.6'QF-900 5 5 0

13.1'TLC-BT-575 1 1 0
1 A2 80'-2'77.7'QF-900 5/7*12 0

13.2'TLC-BT-575 3 3 0
8 A3-A6
C3-C6 60'-60'QF-900 3 3 0

15.5'TLC-BT-575 1 1 0
1 B1 90'-2'87.7'QF-900 11/4*15 0

12.7'TLC-BT-575 2 2 0
1 B2 90'-7'83'QF-900 11 11 0

8.5'TLC-BT-575 1 1 0
1 B3 60'-60'QF-900 4/4*8 0

15.5'TLC-BT-575 2 2 0
1 B4 60'-60'QF-900 4 4 0

15.5'TLC-BT-575 1 1 0
1 C1 70'-9'60.6'QF-900 6 6 0

6.1'TLC-BT-575 2 2 0
1 C2 70'-8'62.2'QF-900 6 6 0

7.7'TLC-BT-575 2 2 0
1 S1 70'-2'67.6'QF-900 7 7 0

13.1'TLC-BT-575 2 2 0
1 S2 90'-3'87.4'QF-900 16 16 0

12.9'TLC-BT-575 4 4 0
2 S3-S4 70'-70'QF-900 7 7 0

15.5'TLC-BT-575 2 2 0
1 S5 80'-80'QF-900 16 16 0

15.5'TLC-BT-575 4 4 0
21 Totals 180 180 0
*This structure utilizes a back-to-back mounting configuration Above Field Level is height of fixtures above area shown Vista Sports Park LED Retrofit
Vista,CA
Grid Summary
Name:Project Spill 150' Offset @ 3ft.

Spacing:30.0'
Height:3.0' above grade
Illumination Summary

INITIAL HORIZONTAL FOOTCANDLES
Entire Grid
Scan Average: 0.0319
Maximum:0.16
Minimum:0.00
CU:0.00
No. of Points:131

FIXTURE INFORMATION
Applied Circuits:A,B,C,D,E
No. of Fixtures:180
Total Load:150.81 kW
Pole location(s)dimensions are relative
to 0,0 reference point(s)
Guaranteed Performance:The ILLUMINATION described aboveis guaranteed per your Musco Warranty document.

Field Measurements:Individual field measurements may varyfrom computer-calculated predictions.

Electrical System Requirements:Refer to AmperageDraw Chart and/or the "Musco Control System Summary"for electrical sizing.

Installation Requirements:Results assume ± 3%nominal voltage at line side of the driver and structureslocated within 3 feet (1m) of design locations. 10/13/2026 C10 62 of 74

ILLUMINATION SUMMARY
Not to be reproduced in whole or part without the wriƩen consent of Musco Sports LighƟng, LLC. ©1981, 2026 Musco Sports LighƟng, LLC.ENGINEERED DESIGN By: D.Lohman  File #211161A  17-Jul-26 C1
C2
A1
B2
B1
A2
(0.00', 0.00', -7.00')
C4
A4
A3
C3
B3
(-1
2 4
.
0 0
'
,

1 0
6 .
3 7
'
,

-
0 .
0 2
'
)
A5
C6
C5
B4
A6
(-18
6 .
1 8
'
,

-
2 5
.
5 2
'
,

0 .
0 0
'
)
S1
S5
S2
(197.98', -171.
5 8
'
,

-
0 .
0 2
'
)
10 10
20 20
30 30
40 40
50 50
40 40
30 30
20 20
10 10
(197.98', -171.
5 8
'
,

0 .
0 0
'
)
S4
S3
(232.00', -399.
0 0
'
,

-
0 .
0 2
'
)
10 10
20 20
30 30
40 40
50 50
40 40
30 30
20 20
10 10
(232.00', -399.
0 0
'
,

0 .
0 0
'
)
5502
7633
7011
6369
3761
4848
1806
2671
3095
3158
4943
5240
3555
1568
1226
1072
921
827
759 929 1402 1690 893 1261 1772 2216 4662 3720 2409 2114 1719 1318 883 639
495
472
527
695
748
1662
3417
2712
3366
4320
4834
4484
4159
5635
7027
9115
9394
9214
7291
6453
4058
3738
1811
1051
1132
1315
1272
1379
2344
5213
9760
9914
9307
8728
6705
4989
5891
5456
510027743463199022332372249725132105164714621334
1930220815741156832836
1048
1029
1071
868
418
381
587
622
813
729
622
628
807
286
783
1094
979
633
206
335
183
224
285
272
765
584
451
497
351
349
382
594 682 769 825
945
1134
1565
2186
3088
5774
SCALE IN FEET 1 : 200
0'200'400'
Equipment List For Areas Shown
Structure Fixtures

QTY STRUCTURE ID SIZE GRADE

ELEVATION

ABOVE FIELD

LEVEL FIXTURE TYPE QTY/POLE THIS
GRID
OTHER
GRIDS
1 A1 70'-2'67.6'QF-900 5 5 0

13.1'TLC-BT-575 1 1 0
1 A2 80'-2'77.7'QF-900 5/7*12 0

13.2'TLC-BT-575 3 3 0
8 A3-A6
C3-C6 60'-60'QF-900 3 3 0

15.5'TLC-BT-575 1 1 0
1 B1 90'-2'87.7'QF-900 11/4*15 0

12.7'TLC-BT-575 2 2 0
1 B2 90'-7'83'QF-900 11 11 0

8.5'TLC-BT-575 1 1 0
1 B3 60'-60'QF-900 4/4*8 0

15.5'TLC-BT-575 2 2 0
1 B4 60'-60'QF-900 4 4 0

15.5'TLC-BT-575 1 1 0
1 C1 70'-9'60.6'QF-900 6 6 0

6.1'TLC-BT-575 2 2 0
1 C2 70'-8'62.2'QF-900 6 6 0

7.7'TLC-BT-575 2 2 0
1 S1 70'-2'67.6'QF-900 7 7 0

13.1'TLC-BT-575 2 2 0
1 S2 90'-3'87.4'QF-900 16 16 0

12.9'TLC-BT-575 4 4 0
2 S3-S4 70'-70'QF-900 7 7 0

15.5'TLC-BT-575 2 2 0
1 S5 80'-80'QF-900 16 16 0

15.5'TLC-BT-575 4 4 0
21 Totals 180 180 0
*This structure utilizes a back-to-back mounting configuration Above Field Level is height of fixtures above area shown Vista Sports Park LED Retrofit
Vista,CA
Grid Summary
Name:Project Spill 150' Offset @ 5ft.

Spacing:30.0'
Height:5.0' above grade
Illumination Summary

INITIAL CANDELA (PER FIXTURE)
Entire Grid
Scan Average: 2576.7253
Maximum:9914.18
Minimum:183.00
CU:0.00
No. of Points:131

FIXTURE INFORMATION
Applied Circuits:A,B,C,D,E
No. of Fixtures:180
Total Load:150.81 kW
Pole location(s)dimensions are relative
to 0,0 reference point(s)
Guaranteed Performance:The ILLUMINATION described aboveis guaranteed per your Musco Warranty document.

Field Measurements:Individual field measurements may varyfrom computer-calculated predictions.

Electrical System Requirements:Refer to AmperageDraw Chart and/or the "Musco Control System Summary"for electrical sizing.

Installation Requirements:Results assume ± 3%nominal voltage at line side of the driver and structureslocated within 3 feet (1m) of design locations. 10/13/2026 C10 63 of 74

ILLUMINATION SUMMARY
Not to be reproduced in whole or part without the wriƩen consent of Musco Sports LighƟng, LLC. ©1981, 2026 Musco Sports LighƟng, LLC.ENGINEERED DESIGN By: D.Lohman  File #211161A  17-Jul-26 C1
C2
A1
B2
B1
A2
(0.00', 0.00', -7.00')
C4
A4
A3
C3
B3
(-1
2 4
.
0 0
'
,

1 0
6 .
3 7
'
,

-
0 .
0 2
'
)
A5
C6
C5
B4
A6
(-18
6 .
1 8
'
,

-
2 5
.
5 2
'
,

0 .
0 0
'
)
S1
S5
S2
(197.98', -171.
5 8
'
,

-
0 .
0 2
'
)
10 10
20 20
30 30
40 40
50 50
40 40
30 30
20 20
10 10
(197.98', -171.
5 8
'
,

0 .
0 0
'
)
S4
S3
(232.00', -399.
0 0
'
,

-
0 .
0 2
'
)
10 10
20 20
30 30
40 40
50 50
40 40
30 30
20 20
10 10
(232.00', -399.
0 0
'
,

0 .
0 0
'
)

0.3 0.3

0.3 0.2

0.1 0.0

0.0 0.1

0.1 0.1

0.2 0.2

0.1 0.1

0.0 0.0

0.0 0.0

0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.1 0.2 0.2 0.1 0.1 0.0 0.0 0.0 0.0

0.0 0.0

0.0 0.0

0.0 0.1

0.1 0.1

0.1 0.1

0.1 0.1

0.1 0.1

0.2 0.2

0.3 0.4

0.3 0.2

0.2 0.1

0.1 0.0

0.0 0.0

0.0 0.0

0.1 0.2

0.2 0.2

0.2 0.2

0.2 0.2

0.1 0.10.10.10.20.10.00.10.10.10.10.10.10.1

0.10.10.00.00.00.00.0 0.0

0.0 0.0

0.0 0.0

0.0 0.0

0.0 0.0

0.0 0.0

0.0 0.0

0.0 0.0

0.0 0.0

0.0 0.0

0.0 0.0

0.0 0.0

0.0 0.0

0.0 0.0

0.0 0.0

0.0 0.0 0.0 0.0 0.0

0.0 0.1

0.1 0.1

0.1 0.2
SCALE IN FEET 1 : 200
0'200'400'
Equipment List For Areas Shown
Structure Fixtures

QTY STRUCTURE ID SIZE GRADE

ELEVATION

ABOVE FIELD

LEVEL FIXTURE TYPE QTY/POLE THIS
GRID
OTHER
GRIDS
1 A1 70'-2'67.6'QF-900 5 5 0

13.1'TLC-BT-575 1 1 0
1 A2 80'-2'77.7'QF-900 5/7*12 0

13.2'TLC-BT-575 3 3 0
8 A3-A6
C3-C6 60'-60'QF-900 3 3 0

15.5'TLC-BT-575 1 1 0
1 B1 90'-2'87.7'QF-900 11/4*15 0

12.7'TLC-BT-575 2 2 0
1 B2 90'-7'83'QF-900 11 11 0

8.5'TLC-BT-575 1 1 0
1 B3 60'-60'QF-900 4/4*8 0

15.5'TLC-BT-575 2 2 0
1 B4 60'-60'QF-900 4 4 0

15.5'TLC-BT-575 1 1 0
1 C1 70'-9'60.6'QF-900 6 6 0

6.1'TLC-BT-575 2 2 0
1 C2 70'-8'62.2'QF-900 6 6 0

7.7'TLC-BT-575 2 2 0
1 S1 70'-2'67.6'QF-900 7 7 0

13.1'TLC-BT-575 2 2 0
1 S2 90'-3'87.4'QF-900 16 16 0

12.9'TLC-BT-575 4 4 0
2 S3-S4 70'-70'QF-900 7 7 0

15.5'TLC-BT-575 2 2 0
1 S5 80'-80'QF-900 16 16 0

15.5'TLC-BT-575 4 4 0
21 Totals 180 180 0
*This structure utilizes a back-to-back mounting configuration Above Field Level is height of fixtures above area shown Vista Sports Park LED Retrofit
Vista,CA
Grid Summary
Name:Project Spill 150' Offset @ 5ft.

Spacing:30.0'
Height:5.0' above grade
Illumination Summary

INITIAL MAX VERTICAL FOOTCANDLES
Entire Grid
Scan Average: 0.0788
Maximum:0.36
Minimum:0.00
CU:0.00
No. of Points:131

FIXTURE INFORMATION
Applied Circuits:A,B,C,D,E
No. of Fixtures:180
Total Load:150.81 kW
Pole location(s)dimensions are relative
to 0,0 reference point(s)
Guaranteed Performance:The ILLUMINATION described aboveis guaranteed per your Musco Warranty document.

Field Measurements:Individual field measurements may varyfrom computer-calculated predictions.

Electrical System Requirements:Refer to AmperageDraw Chart and/or the "Musco Control System Summary"for electrical sizing.

Installation Requirements:Results assume ± 3%nominal voltage at line side of the driver and structureslocated within 3 feet (1m) of design locations. 10/13/2026 C10 64 of 74

EQUIPMENT LAYOUT
Not to be reproduced in whole or part without the wriƩen consent of Musco Sports LighƟng, LLC. ©1981, 2026 Musco Sports LighƟng, LLC.ENGINEERED DESIGN By: D.Lohman  File #211161A  17-Jul-26 Vista Sports Park LED Retrofit
Vista,CA
C1
C2
A1
B2
B1
A2
(0.00', 0.00', -7.00')
C4
A4
A3
C3
B3
(-1
2 4
.
0 0
'
,

1 0
6 .
3 7
'
,

-
0 .
0 2
'
)
A5
C6
C5
B4
A6
(-18
6 .
1 8
'
,

-
2 5
.
5 2
'
,

0 .
0 0
'
)
S1
S5
S2
(197.98', -171
.
5 8
'
,

-
0 .
0 2
'
)Football 1
360' x 160'
10 10
20 20
30 30
40 40
50 50
40 40
30 30
20 20
10 10
(197.98', -171
.
5 8
'
,

0 .
0 0
'
)
S4
S3
(232.00', -399.
0 0
'
,

-
0 .
0 2
'
)Football 2
360' x 160'
10 10
20 20
30 30
40 40
50 50
40 40
30 30
20 20
10 10
(232.00', -399.
0 0
'
,

0 .
0 0
'
)
(0.00', 0.00', 0.00')
SCALE IN FEET 1 : 110
0'110'220'
Pole location(s)dimensions are relative
to 0,0 reference point(s)
Equipment Layout
INCLUDES:· Baseball· Football 1· Football 2· Soccer 1· Soccer 2· Softball 1· Softball 2 Electrical System Requirements:Refer to AmperageDraw Chart and/or the "Musco Control System Summary"for electrical sizing.

Installation Requirements:Results assume ± 3%nominal voltage at line side of the driver and structureslocated within 3 feet (1m) of design locations.

Equipment List For Areas Shown
Structure Fixtures

QTY STRUCTURE

ID SIZE GLOBAL

ELEVATION ABOVE GLOBAL LEVEL FIXTURE TYPE QTY/POLE
1 A1 70'-2'67.6'

13.1'
QF-900
TLC-BT-575
5 1
1 A2 80'-2'77.7'

13.2'
QF-900
TLC-BT-575
5/7*
3 8 A3-A6
C3-C6 60'-60'

15.5'
QF-900
TLC-BT-575
3 1
1 B1 90'-2'87.7'

12.7'
QF-900
TLC-BT-575
11/4*
2 1 B2 90'-7'83'

8.5'
QF-900
TLC-BT-575
11 1
1 B3 60'-60'

15.5'
QF-900
TLC-BT-575
4/4*
2 1 B4 60'-60'

15.5'
QF-900
TLC-BT-575
4 1
1 C1 70'-9'60.6'

6.1'
QF-900
TLC-BT-575
6 2
1 C2 70'-8'62.2'

7.7'
QF-900
TLC-BT-575
6 2
1 S1 70'-2'67.6'

13.1'
QF-900
TLC-BT-575
7 2
1 S2 90'-3'87.4'

12.9'
QF-900
TLC-BT-575
16 4
2 S3-S4 70'-70'

15.5'
QF-900
TLC-BT-575
7 2
1 S5 80'-80'

15.5'
QF-900
TLC-BT-575
16 4
21 Totals 180
Single Fixture Amperage Draw Chart
Driver SpeciĮcaƟons
(.90 min power factor)
Line Amperage Per Fixture
(max draw)
Single Phase Voltage 208
(60)
220
(60)
240
(60)
277
(60)
347
(60)
380
(60)
480
(60)
QF-900 5.3 5.0 4.6 4.0 3.2 2.9 2.3
TLC-BT-575 3.3 3.2 2.9 2.5 2.0 1.8 1.5
*This structure utilizes a back-to-back mounting configuration Above Global Level is height of fixtures above design (0,0,0) 10/13/2026 C10 65 of 74

00052253 1 Exhibit B

EXHIBIT B

NOT APPLICABLE TO THIS CONTRACT

10/13/2026 C10 66 of 74

00052253 1 Exhibit C, Page 1 of 4

EXHIBIT C

INSURANCE AND BONDING REQUIREMENTS
Contractor shall procure and maintain for the duration of the Contract, insurance against claims for injuries to persons or damages to property which may arise from or in connection with the performance of the work hereunder by the Contractor, his agents, representatives, employees, or subcontractors.

MINIMUM SCOPE AND LIMIT OF INSURANCE
Coverage shall be at least as broad as:

1. Commercial General Liability (“CGL”): Insurance Work Office Form CG 00 01 covering CGL on an “occurrence” basis, including products, completed operations, property damage, bodily injury, and personal & advertising injury with limits no less than $2,000,000 per occurrence. If a general aggregate limit applies, either the general aggregate limit shall apply separately to this Project/location or the general aggregate limit shall be twice the required occurrence limit.

2. Automobile Liability: Insurance Work Office Form Number CA 0001 covering Code 1 (any auto), with limits no less than $2,000,000 per accident for bodily injury and property damage.

3. Workers’ Compensation insurance as required by the State of California, with Statutory Limits, and Employers’ Liability insurance with a limit of no less than $1,000,000 per accident for bodily injury or disease.

4. Surety Bonds as described below.

Contractor shall also provide the additional coverages checked below and at least as broad as:

5. Contractors’ Pollution Legal Liability and/or Asbestos Legal Liability and/or Errors and Omissions (if Project involves environmental hazards) with limits no less than $1,000,000 per occurrence or claim, and $2,000,000 policy aggregate.

6. Builder’s Risk (Course of Construction) insurance utilizing an “All Risk” (Special Perils) coverage form, with limits equal to the completed value of the Project and no coinsurance penalty provisions.

7. Professional Liability (if Design/Build), with limits no less than $1,000,000 per occurrence or claim, and $2,000,000 policy aggregate.

If the contractor maintains higher limits than the minimums shown above, the City requires and shall be entitled to coverage for the higher limits maintained by the contractor. Any available insurance proceeds in excess of the specified minimum limits of insurance and coverage shall be available to the City.

Deductibles and Self-Insured Retentions
Any deductibles or self-insured retentions must be declared to and approved by the City. At the option of the City, either: the contractor shall cause the insurer shall reduce or eliminate such 10/13/2026 C10 67 of 74

00052253 1 Exhibit C, Page 2 of 4
deductibles or self-insured retentions as respects the City, its officers, officials, employees, and volunteers; or the Contractor shall provide a financial guarantee satisfactory to the City guaranteeing payment of losses and related investigations, claim administration, and defense expenses.

Other Insurance Provisions
The insurance policies are to contain, or be endorsed to contain, the following provisions:

1. The City, its officers, officials, employees, and volunteers are to be covered as additional insureds on the CGL policy with respect to liability arising out of with respect to liability arising out of work or operations performed by or on behalf of the Contractor including materials, parts, or equipment furnished in connection with such work or operations and automobiles owned, leased, hired, or borrowed by or on behalf of the Contractor. General liability coverage can be provided in the form of an endorsement to the Contractor’s insurance (at least as broad as ISO Form CG 20 10, CG 11 85 or both CG 20 10 and CG 20 37 forms if later revisions used), unless otherwise approved in advance by City.

2. For any claims related to this Project, the Contractor’s insurance coverage shall be primary insurance as respects the City, its officers, officials, employees, and volunteers.

Any insurance or self-insurance maintained by the City, its officers, officials, employees, or volunteers shall be excess of the Contractor’s insurance and shall not contribute with it.

3. Each insurance policy required by this clause shall provide that coverage shall not be canceled, except with notice to the City.

Builder’s Risk (Course of Construction) Insurance
Contractor may submit evidence of Builder’s Risk insurance in the form of Course of Construction coverage. Such coverage shall name the City as a loss payee as their interest may appear.

If the Project does not involve new or major reconstruction, at the option of the City, an Installation Floater may be acceptable. For such Projects, a Property Installation Floater shall be obtained that provides for the improvement, remodel, modification, alteration, conversion or adjustment to existing buildings, structures, processes, machinery and equipment. The Property Installation Floater shall provide property damage coverage for any building, structure, machinery or equipment damaged, impaired, broken, or destroyed during the performance of the Work, including during transit, installation, and testing at the City’s site.

Claims Made Policies
If any coverage required is written on a claims-made coverage form:

1. The retroactive date must be shown, and this date must be before the execution date of the Contract or the beginning of Contract work.

2. Insurance must be maintained and evidence of insurance must be provided for at least five (5) years after completion of Contract work.
10/13/2026 C10 68 of 74

00052253 1 Exhibit C, Page 3 of 4

3. If coverage is canceled or non-renewed, and not replaced with another claims-made policy form with a retroactive date prior to the Contract effective, or start of work date, the Contractor must purchase extended reporting period coverage for a minimum of five (5) years after completion of Contract work.

4. A copy of the claims reporting requirements must be submitted to the City for review.

5. If the services involve lead-based paint or asbestos identification/remediation, the Contractors Pollution Liability policy shall not contain lead-based paint or asbestos exclusions. If the services involve mold identification/remediation, the Contractors Pollution Liability policy shall not contain a mold exclusion, and the definition of Pollution shall include microbial matter, including mold.

Acceptability of Insurers
Insurance is to be placed with insurers with a current A.M. Best rating of no less than A: VII, unless otherwise acceptable to the City.

Waiver of Subrogation
Contractor hereby agrees to waive rights of subrogation which any insurer of Contractor may acquire from Contractor by virtue of the payment of any loss. Contractor agrees to obtain any endorsement that may be necessary to affect this waiver of subrogation. The Workers’ Compensation policy shall be endorsed with a waiver of subrogation in favor of the City for all work performed by the Contractor, its employees, agents and subcontractors.

Verification of Coverage
Contractor shall furnish the City with original certificates and amendatory endorsements, or copies of the applicable insurance language, effecting coverage required by this Contract. All certificates and endorsements are to be received and approved by the City before work commences. However, failure to obtain the required documents prior to the work beginning shall not waive the Contractor’s obligation to provide them. The City reserves the right to require complete, certified copies of all required insurance policies, including endorsements, required by these specifications, at any time.

Subcontractors
Contractor shall require and verify that all subcontractors maintain insurance meeting all the requirements stated herein, and Contractor shall ensure that City is an additional insured on insurance required from subcontractors. For CGL coverage, subcontractors shall provide coverage with a format least as broad as CG 20 38 04 13.

Surety Bonds
Contractor shall provide the following Surety Bonds if checked:

1. Bid Bond.

2. Payment Bond and Performance Bond.

3. Maintenance Bond.
10/13/2026 C10 69 of 74

00052253 1 Exhibit C, Page 4 of 4
The Payment Bond and the Performance Bond shall be in an amount equal to the Contract Ceiling Price. If the Performance Bond provides for a one-year warranty a separate Maintenance Bond is not necessary. If the warranty period specified in the Contract is for longer than one year a Maintenance Bond equal to 10% of the Contract price is required.

Bonds shall be duly executed by a responsible corporate surety, authorized to issue such bonds in the State of California and secured through an authorized agent with an office in California.

Special Risks or Circumstances
City reserves the right to modify these requirements, including limits, based on the nature of the risk, prior experience, insurer, coverage, or other circumstances.

10/13/2026 C10 70 of 74

00052253 1 Exhibit D

EXHIBIT D

AGREEMENT TO COMPLY WITH CALIFORNIA LABOR LAW REQUIREMENTS

TO BE EXECUTED BY BIDDER AND SUBMITTED WITH BID
[Labor Code §§ 1720, 1771.1, 1773.8, 1775, 1776, 1777.5, 1813, 1860, 1861, 3700] The undersigned Contractor certifies that it is aware of and hereby agrees to fully comply with the following provisions of California law:

1. No contractor or subcontractor may be listed on a bid proposal for a public works project unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5 [with limited exceptions from this requirement for bid purposes only under Labor Code section 1771.1(a)]. No contractor or subcontractor of any tier may be awarded a contract for public work on a public works project without proof of registration with the Department of Industrial Relations pursuant to Labor Code section 1725.5.

This project is subject to compliance monitoring and enforcement by the Department of Industrial Relations.

2. Contractor acknowledges that this contract is subject to the provisions of Division 2, Part 7, Chapter 1 (commencing with Section 1720) of the California Labor Code relating to public works and the awarding public agency (“Agency”) and agrees to be bound by all the provisions thereof as though set forth in full herein.

3. Contractor agrees to comply with the provisions of California Labor Code Section 1773.8 which requires the payment of travel and subsistence payments to each worker needed to execute the work to the extent required by law.

4. Contractor agrees to comply with the provisions of California Labor Code Sections 1774 and 1775 concerning the payment of prevailing rates of wages to workers and the penalties for failure to pay prevailing wages. The Contractor shall, as a penalty to the Agency, forfeit not more than fifty dollars ($50) for each calendar day, or portion thereof, for each worker paid less than the prevailing rates as determined by the Director of Industrial Relations for the work or craft in which the worker is employed for any public work done under the contract by Contractor or by any subcontractor.

5. Contractor agrees to comply with the provisions of California Labor Code Section 1776 which require Contractor and each subcontractor to (1) keep accurate payroll records, (2) certify and make such payroll records available for inspection as provided by Section 1776, and (3) inform the Agency of the location of the records. The Contractor is responsible for compliance with Section 1776 by itself and all of its subcontractors.

6. Contractor agrees to comply with the provisions of California Labor Code Section 1777.5 concerning the employment of apprentices on public works projects, and further agrees that Contractor is responsible for compliance with Section 1777.5 by itself and all of its subcontractors.

7. Contractor agrees to comply with the provisions of California Labor Code Section 1813 concerning penalties for workers who work excess hours. The Contractor shall, as a penalty to the Agency, forfeit twenty-five dollars ($25) for each worker employed in the execution of the contract by the Contractor or by any subcontractor for each calendar day during which such worker is required or permitted to work more than 8 hours in any one calendar day and 40 hours in any one calendar week in violation of the provis ions of Division 2, Part 7, Chapter 1, Article 3 of the California Labor Code.

8. Registrations under Section 1725.5 expire annually at the end of June, and Contractor is responsible for verifying the renewal status of each subcontractor, of any tier, working on this Contract, and providing City with an updated list of all subcontractors and their registration status. Subcontractors who do not timely renew their registration must be removed from the job site until they are registered. The removal of a subcontractor for failure to be registered shall not be cause for any extension of time or additional compensation of any nature under the Contract.

9. Contractor shall provide to City, as a condition precedent to the payment of Contractor’s final retention, a complete list of all subcontractors who have worked on the Project, including their registration numbers. This list must be provided at least 30days prior to the payment of the final retention and shall be submitted under penalty of perjury.
10/13/2026 C10 71 of 74

00052253 1 Exhibit D

10. To the fullest extent permitted by law and without limitation by the other provisions of this Contract relating to indemnification and insurance, Contractor shall also indemnify, defend and hold harmless City, and its directors, officers, employees and agents from and against all liability, excluding penalties assessed against City under Labor Code Section 1773.3, but including, without limitation, associated investigation and administrative expenses, defense costs, reasonable attorneys' fees, expert witnes s fees, court costs, and costs of alternative dispute resolution, resulting from Contractor’s failure to comply with the provisions of this section and of Article 2, Chapter 1, Part 7, Division 2 of the California Labor Code with respect to Contractor, all subcontractors of any tier, and their respective employees working under this Contract.

11. California Labor Code Sections 1860 and 3700 provide that every contractor will be required to secure the payment of compensation to its employees. In accordance with the provisions of California Labor Code Section 1861, Contractor hereby certifies as follows:
“I am aware of the provisions of Section 3700 of the Labor Code which require every employer to be insured against liability for worker’s compensation or to undertake self-insurance in accordance with the provisions of that code, and I will comply with suc h provisions before commencing the performance of the work of this contract.”
Signature Date
Name/Title Company:
10/13/2026 C10 72 of 74

00052253 1 Exhibit E

EXHIBIT E

SPECIAL PROVISIONS
This Contract is subject to the following provisions, if checked:

1. State of California grant conditions, as attached.

2. Federal grant conditions, as attached.

3. Other conditions, as attached.

10/13/2026 C10 73 of 74