Project Manager, Superintendent, Foreman, etc.) that will be assigned to this Project and provide references in the format presented in said appendices (see list of Appendices in Table of Contents on
Project and be present while work is being performed.
Should CIPP be utilized, the past system would encompass the proposed resin and felt combination.
Within ten (10) Working Days of the bid opening, the assumed Contractor (apparent low bidder) shall submit contractual required documentation of 500,000 linear feet of successful wastewater 10/27/2026 C3 190 of 424
178
collection system installations in the U.S. of the proposed rehabilitation system to satisfy the contractual requirement of the products commercial viability and Contractor’s capability (see appendices (see list of Appendices in Table of Contents on Page 2) for the required format for this submittal).
Within thirty (30) calendar days after Project Award, the Contractor shall submit to the Agency Design Calculations for the pipe liner for approval. The Design Calculations shall be in accordance with ASTM F1216, Appendix X1 for fully deteriorated pipe. The pipe liner shall be designed to support hydraulic, soil, and live loads based on a minimum ten foot (10') burial depth to top of pipe and highway loading per AASHTO. If local conditions impose greater loads, the greater loads shall be used. Local conditions may include depth greater than ten feet (10’), railroad loading, groundwater or other loadings.
Prior to rehabilitation, the Contractor shall submit drawings of construction details and all other submittals per Subsection 3-8 (“Submittals.”). The shop drawings shall include the location, method of rehabilitation and when applicable, any by-pass locations with sufficient detail to assure that the work can be accomplished without any sewage spill.
At each repair location, at least two (2) Working Days prior to commencing the rehabilitation work, the Contractor shall submit written verification the sewer pipe sections to be rehabilitated are free of obstructions, debris and is suitable for performing the pipe liner restoration repairs.
500-3 CLEANING AND PRELIMINARY INSPECTION.
500-3.2.2 Closed Circuit Television (CCTV) System Equipment.
Delete this subsection in its entirety and replace with the following:
The camera source image shall provide a high resolution video with minimum thirty (30) frames per second producing a continuously-monitored high-quality picture, capable of discerning all major and minor operational and structural defects in the pipelines.
The minimum video bit rate shall be 4.7 Mega bits per second (Mbps) and minimum audio bit rate shall be 128 Kilo bits per second (Kbps).
Video equipment shall include a multi-angle camera capable of spanning 360-degrees circumference and 270-degrees on horizontal axis.
Video inspection shall be performed utilizing one of the following video camera systems:
1. Remote-focus stationary lens cameras;
2. Rotating-lens cameras; or
3. Pan-and-tilt cameras
The video camera shall be mounted on a skid, floatable raft system, or transporter based on the conditions of the pipeline to be recorded. The radial view camera shall be solid-state color and have remote control of the rotational lens. The camera shall be capable of viewing the complete 10/27/2026 C3 191 of 424
179
circumference of the pipe and junction structure e.g., manhole. Cameras using mirrors or exposed rotating heads are not acceptable.
The camera shall be operative in 100 percent humidity conditions.
Camera lens shall not be less than 140 degree viewing angle.
Focal distance shall be remotely adjustable through range of six inches (6”) to infinity (∞).
The remote-reading footage counter shall be accurate to less than one percent (1%) error over the length of the particular section of pipeline being inspected. This distance is measured from the centerline of the junctions (e.g., manhole to the centerline of the next manhole).
The camera height shall be adjusted such that the camera lens is always centered in the pipe being inspected. The equipment shall display on the monitor the distance of the camera from the centerline of the starting manhole. Unless otherwise approved by the Engineer, footage measurements shall begin at the centerline of the upstream manhole.
Lighting and camera quality shall produce a clear, in-focus picture of the entire periphery of the pipe for a minimum distance of 6’. Lighting shall be remote-controlled and adjusted to minimize reflective glare and to avoid any dark or shadowy regions appearing on the video file.
The video camera and monitor shall be capable of registering a minimum of four hundred (400) vertical lines and four hundred sixty (460) horizontal lines resolution and be a clear, stable image with no interference.
The video portion of the digital recording shall be free of electrical interference and shall produce a clear and stable image. The audio portion shall be sufficiently free of background and electrical noise providing an oral report that is clear and discernible.
For pipes smaller than six inches in diameter (6”Ø), the Contractor shall use portable long range pan and tilt push cameras with a motorized wheel to push the probe for one hundred eighty (180’) or more feet down the pipes (e.g., laterals).
The Contractor shall provide a camera, capable of extended video recording lengths and operation in remotely accessed areas without direct vehicular access.
500-3.3 Cleaning
Add the following paragraphs to this subsection:
Should hazardous waste material be encountered, the Contractor shall be responsible for developing a health and safety plan for the handling and disposal of hazardous waste. Any hazardous waste material encountered during the Project shall be placed on eight (8) mil plastic sheets and covered with eight (8) mil plastic sheets. The Contractor shall protect any hazardous waste from contaminating the area due to any surface runoff and / or precipitation. The Contractor shall dispose of the waste at a landfill approved by the Agency. If temporary stockpiling of hazardous waste is 10/27/2026 C3 192 of 424
180
allowed by the Engineer, the Contractor shall contain the waste in a fenced area that is inaccessible to the general public.
The Contractor shall examine the site conditions to determine if pipeline re-cleaning may be necessary immediately prior to pipeline rehabilitation. Site conditions include, but are not limited to size of pipe, type of pipe, age and conditions of pipe, grade, flow conditions, weather conditions, locations and number of feeder lines connecting to the line to be rehabilitated, and the type of rehabilitation method chosen are all important considerations for determining the maximum allowable time lapse between line cleaning and line rehabilitation.
500-3.4 Closed Circuit Television (CCTV) Inspection.
Delete this subsection in its entirety and replace with the following:
Work under this section shall consist of investigation of pipelines by use of digital closed circuit color video recording to determine condition of lines following cleaning, rehabilitation, and installation of gravity pipelines (when required).
The Contractor in coordination with the Engineer shall video record pipelines to:
1. locate existing laterals,
2. confirm no flow in existing mains prior to abandonment,
3. assess the conditions of the existing pipe segments and laterals after the cleaning process and prior to commencing rehab work, and
4. accept the newly installed or rehabilitated pipelines.
Video inspection shall show with high resolution operational and structural defects (e.g., inflows, sags, offset joints, cracks, roughness, “fins” or folds in the pipelines, complete with audio commentary and inspection log).
The Engineer shall be notified a minimum of two (2) Working Days in advance of video inspecting.
Video inspection shall be performed one pipe reach (e.g., manhole to manhole) at a time.
The Contractor shall video inspect the pipeline with maximum flow diverted from the pipeline. The pipe reach being inspected shall be isolated from the remainder of the pipelines with the upstream sewage flow bypassed. In the event that the existing flow is interfering with the video operation, a bypass shall be performed by the Contractor to lower the flow volume sufficiently to allow for a clear video picture. Sufficient water shall be supplied to the isolated section to cause drainage reaching the downstream manhole prior to video inspecting. If existing flows are high, pre-construction video inspection can be done with partial flow. Depth of the flow shall not exceed:
1. Pipes 6" - 10": 20% of the pipe diameter.
2. Pipes 12" - 24": 25% of the pipe diameter.
3. Pipes 27" and up: 30% of the pipe diameter.
10/27/2026 C3 193 of 424
181
The camera shall be moved through the pipeline in a downstream direction at a uniform rate by means of power cable winches or self-propelled tractors at each manhole, stopping and rotating the camera head at each lateral connection, defect, or both to allow for adequate evaluation. The Contractor shall stop when necessary to ensure proper documentation of the pipe condition, but in no case shall the camera be pulled at a speed greater than thirty feet (30’) per minute. A clear picture shall be provided looking into each service connection. Both pre- and post-video inspections shall be submitted to the Engineer.
Measurement for location of defects shall be above ground by means of a measuring device.
Footages shown in the digital files shall coincide with horizontal lengths from stationing as shown on the Plans. Footage measurements shall begin at the centerline of the upstream manhole or storm drain access point, unless permission is given by the Engineer to do otherwise.
The Contractor shall clean the sewer mains or storm drains prior to video inspecting as necessary to adequately perform the video recording operations. If the camera will not pass through the entire pipeline section, the Contractor shall reset the equipment at the downstream manhole and attempt to inspect the section of pipe from the opposite direction. If the camera fails to pass through the entire section, it shall be assumed that an obstruction exists. Efforts to video record that section of pipe shall be temporarily suspended and the Contractor shall notify the Engineer. Upon removal of the obstruction, the Contractor shall complete the inspection.
If an obstruction is encountered during the post-construction video inspection, the Contractor shall remove the obstruction by excavation, repair, or other means approved by the Engineer at the Contractor’s expense, in order that video inspection may continue.
The system used to move the camera through the pipe shall not obstruct the camera’s view. The Contractor shall calibrate the measuring device each day with a known distance to the satisfaction of the Engineer prior to starting the inspection and video recording process.
The Contractor shall obtain the Engineer’s approval for any additional point repairs.
See the Contract appendices (see list of Appendices in Table of Contents on Page 2) for additional requirements for video inspection deliverables.
500-3.4.1 Reports and Documentation.
Add the following new subsection:
500-3.4.1 Reports and Documentation. The Contractor shall provide a sample submittal at the start of video inspecting work demonstrating the typical video with audio quality and the database to be provided for approval by the Engineer. This submittal shall note any proposed changes to these specifications e.g., video format, data bases, compression, or other condition for review and approval by the Engineer.
Both pre- and post-inspections digital files, log sheets, and reports shall be submitted to the Engineer and will become property of the City.
10/27/2026 C3 194 of 424
182
The Contractor shall use a dual recording system and submit post video inspection files to the Engineer, subsequent to recording.
The Contractor shall use the City’s standard inspection introduction, abbreviations, log sheet forms, and severity code with legend when recording the line segment information.
The inspection reports shall incorporate and utilize a standardized City’s rating system to be provided for comprehensive evaluation of pipeline, manhole condition, or both, i.e., a standardized listing of facility condition and defect codes. Pipe condition and fault information tied to pipe location shall also be recorded in the Report.
Documentation shall consist of color digital video files, log sheets, and a written report detailing the condition of the pipeline and lateral connections and openings. Video files shall be provided on external hard drive or on DVD.
The video files shall be highly compressed, resulting in an anticipated average file size of 10 MB per minute of video. The compression shall be in accordance with Windows Media Video (WMV) format.
The compression shall not significantly degrade the still frame quality of the video or audio signal from the original source video, as judged in a side by side viewing under normal viewing conditions.
The report shall note the time and date of video inspection, street name, upstream and downstream manhole, direction of view, direction of flow, surface material, pipeline length, pipe section length, pipe size, pipe material, lateral connections, DVD number, counter number, and a detailed logging of defects encountered in tabular form.
Each submittal shall include the following:
Visuals
1. Adequate view of the upstream and downstream manholes or storm drain access points. The direction of the survey upstream or downstream.
2. A pause at and zoom in on the lateral connections for at least fifteen (15) seconds for identification of the condition of the connection.
3. A pause at and zoom in on the identified defects sufficient for identification of the type of problem.
4. Identified fault conditions or defects (use standardized condition and defect codes).
5. Each pipe section shall be identified by street name, nearest intersection, distance from intersection and manhole numbers. If shown on the Plans, station numbers and sheet numbers shall also be identified.
6. A continuous read-out of the camera distance from the starting manhole to the end point at all times.
7. Pipe size.
8. Pipe or liner material.
Audio
1. Date of CCTV inspection.
10/27/2026 C3 195 of 424
183
2. Confirmation of each section to be CCTV inspected (i.e., narrative of manholes, storm access points or station numbers and direction upstream or downstream.
3. Description of pipe size lined on post and final videos, material liner type for post and final videos and pipe joint length.
4. Description and location of each defect.
5. Description and location of each service connection.
6. Include brief but informative comments on data of significance, including, but not limited to, the locations of unusual conditions, type and size of connection, collapsed section, the presence of scale and corrosion, and other discernible features.
7. A continuous read-out of the camera distance from the starting manhole.
Written Documentation
1. Date of CCTV inspection.
2. Printed labels on DVD or storage device number, location information, date of inspection, and other descriptive information.
3. Location, size, material, and length of pipe.
4. Direction of flow and measurement "From" manhole or storm drain access point or station number "To" manhole or storm drain access point or station number.
5. File numbers itemizing individual segments.
6. Sketch showing the street and cross streets where the CCTV inspection was made.
7. Description and location of each defect or deficiency and a list of all proposed repairs.
8. Description and location of each connection.
9. A menu which lists files for each pipe section to be inspected and the date of the inspection.
The reporting software shall be compatible with City’s format requirements. The reporting software shall utilize Microsoft Access database. The reports shall also show all service lateral connection locations.
Video files will be reviewed by the Engineer for focus, lighting, sound, clarity of view, and technical quality. Videos recorded while a camera has flipped over in the process of traveling and the viewing of laterals, obstructions or defects that are blocked by cables, skids or other equipment will not be accepted. Sharp focus, proper lighting, and clear distortion-free viewing during the camera operations shall be maintained. Failure to maintain these conditions will result in the rejection of the submittal.
One file shall be provided for each manhole to manhole pipe segment (or for each manhole to manhole inspection video).
500-3.4.2 Video Inspection Submittals.
Add the following new subsections:
500-3.4.2 Video Inspection Submittals. The Contractor shall make submittals during construction as applicable to the Project. Each video submittal shall be limited to twenty (20) segments. In the event that any deficiencies are discovered by the Engineer, either by the Contractor’s video inspection or the Engineer’s inspection, five (5) Working Days shall be allowed for the Engineer to judge whether 10/27/2026 C3 196 of 424
184
the deficiencies or sags are repairable, in place. If the judgment is made that the deficiencies are non- repairable in place, the affected portion(s) shall be reconstructed at no cost to the Agency.
Existing Sewer Mains Proposed To Be Replaced - When video inspecting existing mains proposed to be replaced, the Contractor shall provide the video files and a red-lined set of Plans showing the location of the existing laterals to the Engineer before constructing the new sewer mains. Service lateral video inspection shall be submitted separately.
Post Cleaning Videos Prior To Rehabilitation Of Mains - The Contractor shall video record the pipe segments after the cleaning process has been completed and prior to commencing rehabilitation work.
If point repairs are necessary, the Contractor shall identify the location of the proposed point repairs and submit the post cleaning video within five (5) Working Days of completion of the segment cleaning and at least five (5) Working Days prior to commencing the rehab work to obtain prior approval by the Engineer. The Engineer will review each video submittal within ten (10) Working Days of receiving submittal. The post cleaning video for the remainder of the mainline segments shall be submitted.
Post Cleaning Videos For Rehabilitated Laterals Or Lateral Launch Videos - The Contractor shall video record the lateral segments after the cleaning process has been completed and prior to commencing any work on laterals. The post cleaning video for service lateral launch shall be submitted within 5 Working Days of segment cleaning. The Engineer will review each video submittal within 10 Working Days of receiving each submittal. Each submittal shall be limited to 20 segments. The video inspection shall include inspection of service lateral a minimum of 30’ in length from the mainline or up to the property line unless an obstruction is encountered.
Service Lateral Video - If the property line clean-outs are not known to exist, service lateral video may be obtained with camera equipment designed to launch into the service lateral from the mainline or access from the private property with homeowner’s permission. Each service lateral shall be identified by the FSN of the mainline (when FSN are included in the Contract Documents) and the address of the property which it serves. Failure to comply with these specifications may result in one or more of the following:
1. A delay of the review and approval of the submittal(s).
2. Delay in progress payments.
3. Require the Contractor to repeat video recording the pipelines at no cost to the City.
Final Video Inspection – New sewer mains or storm drains shall be video inspected and recorded not less than twenty-two (22) Working Days after completion of permanent trench restoration and finished grading, but prior to final resurfacing. The Contractor shall review the digital file for any discrepancies or deficiencies in the installation of the pipe or liner. The Contractor shall notify the Engineer at least thirty (30) Working Days in advance of the anticipated date that Acceptance will be requested. If the specified advance notice is not given, Acceptance and bond release may be delayed.
For sewer mains only: The Contractor shall first clean the line with high pressure water jetting equipment and a sewer ball, and then perform tests as specified by the Engineer. The Contractor shall provide for collection of debris from cleaning operation. The Contractor shall dispose of water into an existing sanitary sewer system or pump station.
10/27/2026 C3 197 of 424
185
For sewer mains only: The camera shall stop at each lateral connection, focus on the bottom of the opening and then make one slow clockwise observation around the perimeter of the lateral which clearly shows the quality of the connection. Then, the camera shall focus on the center of the lateral opening for a minimum of fifteen (15) seconds before moving on to also adequately show and document that the saddle has been installed properly for new installations and that the lateral opening has been reestablished for rehabilitation. Each lateral shall be identified by the address of a property which it serves. If the Contractor fails to properly show and document within the database any of the lateral openings, the Contractor will be required to repeat video recording that section of pipeline at no additional cost to the City.
Post-rehabilitation Videos - Post-rehabilitation videos shall be submitted within thirty (30) days of completion of the Work. The final video recording shall clearly show the condition of the liner with ends sealed at the manholes, service lateral and connection seals. The submittal of this final video recording shall also include MS Access database and marked up Field Book pages or Plans as attachments. Failure to deliver the submittal(s) within the time identified or if a total of more than twenty (20) segments are submitted in a single video may result in one or more of the following:
1. A delay of the review and approval of the submittal(s).
2. Delay in progress payments.
500-3.4.3 Tolerances.
Add the following new subsections:
500-3.4.3 Tolerances. Tolerances encountered following inspection shall be addressed as follows:
1. For new underground sewer or storm drain conduit installations, the maximum operational tolerance for sag shall be one-half inch (1/2”). When video recorded inspection is used to check for sag, a calibrated one-quarter inch diameter (1/4”Ø) steel bar, mounted in front of the camera, shall be used to measure the depth of sag.
2. For rehab work, tolerances shall be in accordance with Subsection 500-5.5.10 (“Defect Tolerances.”)
3. If the Engineer determines that the deficiencies or sags are non-repairable in place, the affected portion(s) shall be reconstructed in accordance with Subsection 3-13 (“COMPLETION, ACCEPTANCE, AND WARRANTY.”)
500-3.4.4 Payment.
Add the following new subsections:
500-3.4.4 Payment. Cleaning and video inspecting pipelines and culverts shall be included in the various Bid items unless separate Bid items have been provided.
500-3.7 Payment.
10/27/2026 C3 198 of 424
186
Add the following paragraph to this subsection:
The external point repair work will be measured and paid for at the unit price bid per each external point repair. Measurement will be made at the pipe and will be based on the length of pipe repaired.
The Contractor will be paid for one (1) external point repair for each repair ten feet (10’) or less in length.
500-4 PIPELINE POINT REPAIR AND/OR REPLACEMENT.
500-4.1 General.
Delete the last two sentences of the first paragraph and the second paragraph and replace with the following paragraphs:
The Contractor shall be responsible for repairing the pipeline where external point repairs are deemed necessary from pre-televising inspection and as approved by the Agency.
External point repair work shall include, but not be limited to, locating the point repair through CCTV, locating all interfacing utilities, excavation, dewatering, pipe repairs or placement, backfilling, surface restoration, temporary flow bypassing, sewer dewatering, and traffic control.
If an excavated point repair would have too great an affect on vegetation (as identified by the Agency’s biologist), or if excavation is not possible due to existing walls, buildings, or other structures, the Contractor shall then perform the point repair from the interior of the pipe in accordance with SECTION 501 (“SERVICE LATERAL CONNECTION SEALING.”) of these specifications. The Contractor shall televise the pipe prior to rehabilitation and submit to the Engineer their recommendation of, and plan for, internal point repairs.
500-4.8 Repair Methods.
Add the following new subsection:
500-4.8 Repair Methods. One (1) or a combination of the following methods shall be used.
Methods selection shall be subject to approval by the Engineer prior to its installation.
A. Install full circle repair clamp as recommended by the manufacturer and approved by the Engineer. All metallic hardware shall be 316 stainless steel.
B. Install in accordance with manufacturer’s recommendations.
C. Remove defective pipe or fittings to the nearest joint or by cutting perpendicular to the pipe axis to leave a plain end. Prepare a replacement section of like pipe material or as otherwise approved by the Engineer. Make connections using standard joints, repair clamps, couplings, or heat-shrink sleeves.
500-5 LINING
10/27/2026 C3 199 of 424
187
500-5.1 General.
Add the following after the first paragraph in this subsection:
The Contractor shall perform tests on all rehabilitated facilities and submit test results for the review and approval of the Engineer. Pipe sections for sampling shall be produced by the restrained sample method at a location of convenient access, unless other methods are approved in writing by the Engineer. Pipe liner samples shall be prepared and physical properties tested in accordance with either ASTM F1216 or ASTM F1743. The flexural properties must meet or exceed the values listed in Table 1 of the applicable ASTM. Wall thickness of samples shall be determined as described in paragraph 8.1.6 of ASTM F1743. Visual inspection of the pipe liner shall be in accordance with ASTM F1743. Unless otherwise noted, no separate compensation will be paid for testing; the testing costs are to be included in the related pay items. If the work should fail to pass the tests, it is the Contractor’s responsibility to correct the work and re-test with no additional compensation to the Agency.
If, within the warranty period, any section of the sewer system is not acceptable due to subsequent excessive leakage or any other defects, although originally accepted, the Contractor shall repair or replace the affected portion at no cost to the Agency. It is understood that if the Contractor fails to do such work as required, the Surety shall be liable for said costs of repair or replacement.
All sewers rehabilitated method shall be tested for leakage in accordance with Subsection 306-7.8.2 (“Pressure Testing and Leakage Inspection.”).
500-5.5 Cured-In-Place Pipe (CIPP) Liner.
500-5.5.1 General.
Revise the first sentence in this subsection to read as follows:
CIPP Liner for rehabilitation of pipelines shall use an approved vinyl-ester-resin-impregnated flexible tube installed by an inversion method using a hydrostatic head per ASTM F1216 or a pull in method per ASTM F1743.
Add the following sentence to the first paragraph:
The minimum thickness of flexible tube shall comply with ASTM F1216.
500-5.5.2 Material Composition and Testing.
Add the following to this subsection:
Vinyl-ester resin-impregnated CIPP Liner felt shall have the following minimum physical properties:
PROPERTY ASTM Test Method Minimum Physical Property (psi) Flexural Strength D 790 4,500
Flexural Modulus D 790 Initial: 250,000
10/27/2026 C3 200 of 424
188
PROPERTY ASTM Test Method Minimum Physical Property (psi) Long Term: 125,000
The CIPP shall be designed as per ASTM F 1216, Appendix X1, with the following additional requirements:
The CIPP design shall assume no bonding to the original wall pipe.
External Hydrostatic Design - Acceptable third party testing and verification of the enhancement factor, K, (equation 1 - ASTM F 1216) shall be submitted by the manufacturer and / or liner product.
500-5.5.10 Defect Tolerances.
Add the following new subsection:
500-5.5.10 Defect Tolerances. During post installation video the new liner shall be examined to determine the existence of liner defects. Liner defects shall include but not be limited to fins, wrinkles, imperfections, areas of uncured resin, or areas of incomplete resin impregnation. A fin or wrinkle shall be defined as a defect when it penetrates inside the pipe more than quarter inch (0.25”) from the inside wall curvature of the new liner that is juxtaposed to the fin or wrinkle. A remedial repair and / or replacement action plan shall be submitted by the Contractor to the Agency for review and approval for ANY defect prior to any corrective action. Failure to obtain Agency’s approval of the corrective plan may result in rejection of the liner and replacement with a new liner or a new pipe (if required).
500-8 SERVICE CONNECTION RE-ESTABLISHMENT.
Delete the second paragraph in its entirety and replace with the following paragraphs:
As part of the summary of work, the Work of this Contract includes the partial lining approximately eight to ten inches (8” – 10”) into the service connection pursuant to SECTION 501 (“SERVICE LATERAL CONNECTION SEALING”) in these specifications. It is the intent to line the pipe without excavation and to provide a permanent lateral sealing in newly relined mainline pipeline.
If the service connection is to be re-established by a remote control device, the Contractor shall have a fully operational backup device on site. After re-establishment, the reconnected service lateral shall be sealed to the liner. The Contractor shall seal the connection to the liner pipe by extending the liner pipe contiguously into the lateral a minimum of eight inches (8”). The Contractor shall have the Engineer onsite during the process to verify the completion of the work.
All costs associated with re-establishing and sealing, by open trench or service lateral connection (SLC), into the service connection shall be included in the unit price bid for service lateral connection and no additional payment shall be made.
10/27/2026 C3 201 of 424
189
SECTION 501 – SERVICE LATERAL CONNECTION SEALING
501-1 GENERAL.
Add the following after the second paragraph in this subsection:
The finished SLC product shall be fabricated from materials which when cured will be chemically resistant to withstand internal exposure to domestic sewage. All constituent materials will be suitable for service in the environment intended. The final product will not deteriorate, corrode, or lose structural strength that will reduce the projected product life.
The structural performance of the finished pipe must be adequate to accommodate all anticipated loads throughout its design life. No cured-in-place pipe rehabilitation technology will be allowed that requires bonding to the existing pipe for any part of its structural strength.
Design methods are to be derived from traditionally accepted pipe formula for various loading parameters and modes of failure. All equations will be modified to include ovality as a design parameter. The design method shall be submitted to the Engineer for approval prior to the Pre- Construction Meeting.
Modify Row 1 of Table 501-1 with the following:
Property ASTM Test Method Results (psi) Flexural Stress D790 4,500
501-6 INSPECTION, TESTING, AND REPAIR OF INSTALLED SLC SEALING SYSTEMS. 501-6.5 Repair.
Add the following paragraphs to this subsection:
500-6.5 Repair. If, within the warranty period, the SLC seals installed in the sewer system are not acceptable due to leakage or any other defects, although originally accepted, the Contractor shall repair or replace the affected portion at no cost to the Agency. It is understood that if the Contractor fails to do such work as required, the Contractor shall be responsible for said costs of repair or replacement.
501-6.6 Deviations.
Add the following new subsection:
501-6.6 Deviations. The Contractor shall submit a unit price proposal for the appropriate size and angle. The deterioration of service laterals is an ongoing process. Should pre-inspection reveal that the SLC cannot be used, the Contractor, upon notifying the Agency's representative, can dig and replace the lateral(s) or advise the Agency's representative it is inadvisable to rehabilitate. 10/27/2026 C3 202 of 424
190
501-8 PAYMENT.
501-8.1 Insitu Point Repairs.
Add the following new subsection:
501-8.1 Insitu Point Repairs. All costs associated with insitu point repairs shall be included in the bid price for insitu point repairs and paid for in accordance with Subsection 500-3.7(“Payment.”) of these Supplementary Special Provisions.
SECTION 502 - MANHOLE AND STRUCTURE REHABILITATION
502-4 Repair, Resurfacing and Active Infiltration.
502-4.1 General.
Add the following paragraphs to this subsection:
The Contractor shall remove the existing manhole steps, rechannel the manhole base to accommodate upsize, new and/or rehabilitated mains, and replace the existing manhole frame and cover with new per Subsection 206-3.3 (“Manufacturing and Finishing.”) and the Standard Drawings.
In addition, in unpaved areas, the top of manholes shall be raised eighteen inches (18”) above ground surface and covers shall be locked per standard drawing SDRSD No. M-4 (“MANHOLE COVER – LOCKING DEVICE.”). The covers shall be bolted to the grade ring with special 1" (across head) Apenta head bolts, type 5/8" thread (0.625" x 20 UNC thread), 12” long. Bolts to be class 304 stainless steel (see Appendices (see list of Appendices in Table of Contents on Page 2) for detailed drawings). NOTE:
Manhole covers shall say [CITY OF VISTA SEWER or BUENA SANITATION DISTRICT SEWER].
If the method and type of materials for manhole rehabilitation are not designated on the plans or specifications, the Contractor shall also rehabilitate the manhole in accordance with Subsection 502-
4.3 (“Resurfacing.”).
502-8 PAYMENT.
Add the following paragraphs to this subsection:
The Contractor’s Contract Unit Price bid shall also include the removal of the existing manhole steps, rechanneling the manhole base, high pressure water blasting and cleaning, spark testing and repairs of the new interior manhole lining, and the removal and replacement of the existing manhole frame and covers. In addition, in unpaved areas, the Contract Unit Price bid shall include the raising of the top of manholes and installation of the manhole cover locks.
If the method and type of materials for manhole rehabilitation are not designated on the plans or specifications, the Contract Unit Price shall also include the rehabilitation of the manholes in accordance with Subsection 502-5 (“LINING SYSTEMS.”).
10/27/2026 C3 203 of 424
191
PART 6 – TEMPORARY TRAFFIC CONTROL
SECTION 600 – ACCESS
600-1 GENERAL.
Add the following paragraphs to this subsection:
The Contractor shall make every effort to keep driveways open during working hours. After hours all driveways shall be accessible with smooth and safe crossings through the construction.
In addition, two-directional traffic must be maintained at all times.
In general, only one (1) lane of traffic in each direction may be closed at one (1) time.
Vehicular lane and bicycle lane closures will only be allowed between the hours of 8:30AM and 3:30PM to avoid impacts on commuter traffic and to avoid impacts to the adjacent businesses, local residences and schools.
Other conditions such as pedestrian access and the presence of schools or other special traffic and pedestrian generating facilities may affect the working hours.
600-3 PEDESTRIAN ACCESS.
Add the following paragraph to this subsection:
Sidewalks through the work area may be closed temporarily as long as alternate pedestrian access through the adjacent area or on the opposite side of the street is available at ALL times. The work must be phased so that pedestrian access is maintained at ALL times along street segments and through intersections. This includes performing construction activities only one side of a street segment at a time or on one corner of an intersection at a time to ensure that pedestrian access through the street segment or the intersection is always maintained.
SECTION 601 – TEMPORARY TRAFFIC CONTROL FOR CONSTRUCTION AND MAINTENANCE WORK ZONES
601-1 GENERAL.
Add the following paragraphs to this subsection:
The Contractor shall prepare and submit a traffic control, construction phasing, and detour plan for approval by the Agency, showing how traffic and access will be maintained during the work.
10/27/2026 C3 204 of 424
192
At least two (2) lanes of traffic, one in each direction, must be kept open during construction periods on all streets. The Contractor shall furnish, install and maintain all necessary and appropriate signing and striping for lane closures to accommodate the work zone.
Emergency vehicles shall be permitted to pass through the work area without delay at all times.
Work shall be performed in a portion of the street section while the remainder of the street section is kept open and unobstructed until the newly-constructed improvements are ready for use by traffic.
The Contractor shall phase the removal operations so as to maintain the specified traffic lanes on existing pavement until sufficient new pavement is constructed to accommodate the traffic requirements. A smooth, even surface and a condition satisfactory for traffic shall be maintained on the portion of street where the two-directional traffic is being maintained.
The Contractor shall cooperate with local authorities relative to handling local traffic and providing access to necessary services through the area and shall make his own arrangements relative to keeping the working area clear of parked vehicles.
If temporary ‘No Parking’ zones are part of the approved Traffic Control Plan, the Contractor shall be responsible for furnishing and posting temporary ‘No Parking’ signs a minimum of forty-eight (48) hours in advance of work. Signs shall have the correct legend and any other necessary information such as hours of the day; days of the week; dates that the temporary ‘No Parking’ zone applies; and citation of the applicable section of the California Vehicle Code or the Vista Municipal Code. Signs shall be posted at one-hundred foot (100’) maximum intervals along the approved temporary ‘No Parking’ zone. Signs may be attached to existing sign and street light poles in the public right-of-way as approved in the Traffic Control Plan. When necessary to meet the spacing requirement or to ensure sign visibility, the Contractor shall furnish posts or barricades. The Contractor is responsible for the removal of all temporary “No Parking” signs and fasteners or tape used after the Work is completed on each street or alley.
The Contractor shall be responsible for furnishing and posting temporary ‘No Parking’ signs along all streets approved for closure. In addition to other requirements for temporary “No Parking” signs, “No Parking” signs for temporary road closures shall be posted at one-hundred foot (100’) maximum intervals on each side of the street to be closed, at all intersections, and ends of all cul-de-sac streets.
Implementation of traffic control devices per the approved Traffic Control Plan may not begin each workday before the hours specified on the approved Traffic Control Plan. In addition, construction work must be stopped before the end of the approved work period to allow sufficient time for all traffic control devices to be removed and for other devices and measures to be in place and operational as shown on the approved Traffic Control Plans within the specified time restrictions. The Contractor shall make adjustments to the construction staging and provide any required improvements or additional facilities, including temporary trench steel plate covers, temporary asphalt concrete pavement, barricades and delineators, and temporary signing and striping, which are necessary to make the work site functional and safe at all times. Improvements and facilities necessary to make the work site functional and safe shall be submitted to the Agency’s Traffic engineer for approval as part of the Traffic Control Plan.
10/27/2026 C3 205 of 424
193
Adequate drainage facilities shall be provided to maintain the traveled pavement surface in a condition free from ponding or running water. Water shall not be diverted from existing courses or allowed to pond on private property without the explicit permission, in writing, from the property owner.
Trenches in streets open to traffic shall be provided with temporary pavement surfacing, to maintain a smooth paved travel surface, if the street is not to be provided with permanent pavement surfacing within forty-eight (48) hours after pavement removal. Trench steel plate covers shall not be left in place longer than four (4) consecutive Working Days.
601-2 TEMPORARY TRAFFIC CONTROL PLAN (TCP).
601-2.1 General.
Add the following paragraphs to this subsection:
The Contractor shall be prepared to discuss the traffic control plan and issues related to traffic control and access at the Pre-Construction Meeting. The Contractor shall submit traffic control plans for approval per Subsection 3-8.4 (“Supporting Information.”) at least ten (10) Working Days prior to commencement of work. All phases of the traffic control plans shall be prepared by a California licensed Traffic Control Services Consultant (C31 Contractor’s License – Construction Zone traffic Control Contractor) or a California registered Civil or Traffic Engineer and performed in conformance to the requirements of the latest editions of the California Manual on Uniform Traffic Control Devices (CA MUTCD) for Streets and Highways, Caltrans Standard Specifications and Standard Plans, the Traffic Control Plans included in the latest edition of the San Diego Regional Standard Drawings (SDRSD), and the WATCH Manual (Work Area Traffic Control Handbook). No work shall commence until this plan and each construction phase of the Work that significantly affects existing traffic operations has been reviewed and approved by the Engineer.
The Contractor’s Traffic Control Plan shall list the Working Days and Hours scheduled for each street and each phase of the work, as described in these Specifications.
The relocation and / or installation of traffic and / or parking signs and other directional signage, as required on the Plans, shall conform to the City of Vista Standards, the California Manual on Uniform Traffic Control Devices (CA MUTCD), Caltrans Standard Plans and Standard Specifications, San Diego Regional Standard Drawings (SDRSD), and all current ADA regulations All signs, including those to be relocated or replaced, need to have their new locations approved by the Traffic Engineering Division of the Engineering Department before placement. If not otherwise specified, the work required for Traffic Striping and Signing shall conform to these specifications and those in Section 314.
All signing, including “DETOUR AHEAD” signs and “OPEN DURING CONSTRUCTION” signs shall be proposed by the traffic control plan. The Engineer may direct alteration of the above sign messages and locations.
All traffic lanes shall have a minimum width of eleven feet (11’) unless otherwise specified. In addition to the lane width specified herein, the Contractor shall maintain a clearance of two feet (2’) feet to curbs, barricades, and other vertical obstructions.
10/27/2026 C3 206 of 424
194
It shall be the Contractor's responsibility to notify the appropriate utility companies listed in these Project Specifications and the other agencies listed below, at least two weeks in advance, when access to the public right-of-way is altered in any way. Notifications by the Contractor shall be in writing, with proof of receipt. Copies of each notification and proof of receipt shall be submitted to the Engineer.
UTILITY COMPANY / AGENCY PHONE NUMBER
City of Vista Fire Department (Business Office) 760-643-2801 San Diego County Sheriff’s Office (Non-emergency) 760-940-4551 EDCO Waste and Recycling Company (Customer Service) 760-727-1600 City of Vista Engineering Inspection (24 hour answering machine)
760-639-6113
City of Vista Building Division 760-639-6105
City of Vista Building Inspection Request Line (24 hour answering machine)
760-639-6106
City of Vista Parks and Community Services 760-639-6151 North County Transit District (Monica Coria) 760-967-2851 Vista “Out and About” transit service 760-639-6161 x 1537 Vista Unified School District (Maintenance, Operations & Grounds)
760-726-2170 x 92702
United States Post Office (Vista, CA branch) 800-275-8777
601-2.2 Payment.
Add the following paragraph to this subsection:
Full compensation for developing and maintain (single or multi-phase) Traffic Control Plan and Construction Staging and furnishing Project traffic control, including the cost of all barricades, signs, all variable message signs, tools, equipment, incidentals, flagmen, providing notices, asphalt concrete and aggregate base for temporary resurfacing (and its removal), temporary conflicting traffic stripe application and grinded removal, trench steel plate cover installation and removal, and any other safety measures used for the control of traffic, any temporary rerouting of traffic or maintenance of access to properties during the Project construction period shall be paid for by the lump sum price bid as shown on the BID SCHEDULE and no additional compensation will be allowed.
PART 7 – STREET LIGHTING AND TRAFFIC SIGNAL SYSTEMS
SECTION 700 – MATERIALS
700-1 GENERAL.
Add the following paragraph to this subsection:
All electrical components and electrical materials providing and / or using electrical service shall conform to all applicable City of Vista standards / ordinances, SDG&E Standards, Caltrans Standard 10/27/2026 C3 207 of 424
195
Specifications, Caltrans Standard Plans, and the City of Vista Guidelines for the Preparation of Traffic Signal Design Plans.
700-3 COMMON COMPONENTS.
700-3.5 Conduit.
Add the following sentence to this subsection:
Conduit shall conform to the provisions in Subsection 86-1.02B, "Conduit and Accessories" of the Caltrans Standard Specifications and these Special Provisions.
700-3.5.2 Rigid Metallic Conduit.
Replace the first sentence in this subsection with the following:
Conduit and conduit fittings shall be Type 1 (Hot-dip galvanized rigid steel) and, unless otherwise stated, a minimum standard two inches (2”) in diameter.
SECTION 701 – CONSTRUCTION
701-4 DAMAGE TO EXISTING SYSTEMS.
Add the following paragraph to this subsection:
No payment shall be made for incidental repairs needed to improve surfaces or landscaping required for the construction and installation of these systems. Costs for any such efforts shall be included in the cost of related items themselves listed within the bid items.
701-8 FOUNDATIONS, FOUNDATION CAPS AND SLABS.
701-8.6 Payment.
Replace this subsection with the following:
701-8.6 Payment. Payment for foundations, including protection devices, bolt circles, and reinforcement, foundation caps, and slabs, shall be considered as included in the Contract Unit Price or lump sum price in the Bid for the work that required foundations, foundation caps, and slabs.
701-11.3 Payment.
Replace this subsection with the following:
10/27/2026 C3 208 of 424
196
701-11.3 Payment. Payment for pull boxes shall be considered as included in the Contract Unit Price or lump sum price in the Bid for the work or items that required pull boxes and no additional compensation shall be allowed.
The streets proposed to receive asphalt concrete overlay are classified as Arterial or Collector streets, and subsequently, traffic will experience some delays from the inductive loops being cut by cold mill operations. Inductive loops shall be replaced to be fully functional and operational within twenty-eight (28) calendar days from the day they become non-operational. If this timing requirement is not met, temporary loops or video detection will be required at no extra cost. Temporary loops or video detection will be required until new loop detection is installed and operational.
PART 8 – LANDSCAPING AND IRRIGATION
SECTION 800 – MATERIALS
800-1 LANDSCAPE MATERIALS.
Modify this subsection to read as follows:
800-1 LANDSCAPE MATERIALS. All landscape materials shall conform to all applicable City of Vista Standard Specifications for landscaping (see list of Appendices in Table of Contents). If not otherwise specified in the City of Vista Standard Specifications for landscaping, landscape materials shall conform to the Greenbook, the San Diego Regional Supplement to the Greenbook, and these specifications.
800-1.1 Topsoil.
800-1.1.1 General.
Delete this subsection in its entirety and replace with the following:
All topsoil shall be Class “A” (“imported”), as specified herein.
800-1.2 Soil Fertilizing and Conditioning Materials.
800-1.2.5 Mulch.
Delete this subsection in its entirety and replace with the following:
All mulch shall be Type 1 (ground wood product) as specified herein.
800-1.5 Headers, Stakes, and Ties.
800-1.5.2 Headers and Stakes.
10/27/2026 C3 209 of 424
197
Replace the first paragraph in this subsection with the following:
Headers shall be two inch by four inch (2” x 4”) inch composite wood (similar to “Trex”) except that two one inch by four inch (1” x 6”) boards shall be supplied for laminations on turns and curves.
Header stock shall be supplied in lengths of at least ten feet (10’). Stakes for headers shall be pointed one and one-half inch by eighteen inch (1-½” x 18”) long of one-quarter inch (¼”) thick steel and be set at three feet (3’) on center with stakes located within one foot (1’) of both ends of each header.
Header joint splicing shall use four inch x six inch (4” x 6”) galvanized steel truss plates.
800-2 IRRIGATION SYSTEM MATERIALS.
Modify this subsection to read as follows:
800-2 IRRIGATION SYSTEM MATERIALS. All irrigation materials shall conform to all applicable City of Vista Standard Specifications for irrigation (see list of Appendices in Table of Contents). If not otherwise specified in the City of Vista Standard Specifications for irrigation, irrigation materials shall conform to the Greenbook, the San Diego Regional Supplement to the Greenbook, and these specifications.
800-3 ELECTRICAL MATERIALS.
800-3.1 General.
Add the following paragraph to this subsection:
All electrical materials used for irrigation shall conform to all applicable City of Vista Standard Specifications for electrical materials for irrigation. If not otherwise specified in the City of Vista Standard Specification for electrical irrigation systems, electrical materials used for irrigation shall conform to the Greenbook, the San Diego Regional Supplement to the Greenbook, and these specifications.
SECTION 801 – INSTALLATION
801-1 GENERAL.
Modify this subsection to read as follows:
801-1 GENERAL. The surface preparation, construction of irrigation system for landscape areas, and installation of plants required by the Plans shall conform to the City of Vista standard special provisions for landscaping and irrigation, Technical Provisions from these specifications shall take precedence over other specifications.
10/27/2026 C3 210 of 424
The Contractor shall replace / restore all existing landscaping, sod, topsoil, and irrigation disturbed during the course of construction activities. All replacement of sod shall be of the same type as existed and as approved by the Engineer.
All replacement and new installation of landscape and irrigation shall be of the same type, size, caliper, and spacing as existing and as approved by the Engineer. All areas disturbed by construction, not covered by sidewalk or paved materials shall be landscaped and irrigated in accordance with these Technical Provisions.
All new landscaping shall be planted on salvaged topsoil or new Class A imported topsoil for a depth of twelve inches (12”) as approved by the Engineer.
During surface clearing operations, the Contractor shall not cover or bury any plant growth or other objectionable materials on public or private property. If the Contractor cannot successfully separate the plant growth from the surface soil and advertently or inadvertently mixes organic or other objectionable materials with the soil, the soil so contaminated shall be removed from the site by the Contractor. All costs, if any, associated with removing the soil mixed with organic or other objectionable materials and importing soil to replace said contaminated soil shall be borne by the Contractor and no additional payment shall be made to the Contractor.
The Contractor shall coordinate the removal and reconnection of the existing irrigation system with the property owner. As soon as the improvements in the area where portions of the existing irrigation system had been removed are completed, the Contractor shall reconnect and adjust the irrigation heads so that irrigation may commence. Reconnection may entail replacement and reconfiguration of sprinkler heads for appropriate irrigation coverage. The Contractor shall sufficiently irrigate areas of existing landscaping that are not being irrigated by the compromised irrigation system during the shutdown period.
Any irrigation facilities removed or adjusted for the construction of the sidewalk or other work shall be replaced, relocated, or re-configured with similar materials approved by the Engineer, so that the irrigation system is fully functional and appropriate for the landscaping being irrigated.
***END OF SECTION***
10/27/2026 C3 211 of 424
197
Appendix A:
City of Vista Encroachment Permit Application
(No Fee)
10/27/2026 C3 212 of 424
ENGINEERING DEPARTMENT
200 CIVIC CENTER DR.
VISTA, CA 92084
(760) 639-6111
CONTRACTOR'S MAILING ADDRESS:
ZIP
PHONE#:FAX#:
DESCRIPTION OF WORK:
START
DATE
ESTIMATED
COMPLETION DATE
[email protected]
[email protected]
TRAFFIC CONTROL PLANS (1 COPY)
SITE PLAN / VICINITY MAP (1 COPY)
JOB AND OR DRAWING NUMBER:
ASSESSOR'S PARCEL NUMBER (APN):
STATE LICENSE NUMBER
Please print required information
ENCROACHMENT PERMIT APPLICATION FORM
BUSINESS LICENSE NUMBER
ISSUED BY:DATE:
Version Date 06-29-18
NOTICE: THIS IS NOT AN ENCROACHMENT PERMIT - CONTRACTOR MUST SIGN ACTUAL PERMIT IN PERSON FOLLOWING CONTACTS:
CITY OF VISTA BUSINESS LICENSE (1 COPY)
CALOSHA PERMIT (1 COPY)
PLEASE SEND EMAIL SUBMISSIONS TO BOTH OF THE
JOB SITE ADDRESS OR DESCRIPTION:
WORKMAN'S COMP INSURANCE (1 COPY)
PERMIT #: PERMIT EXPIRATION DATE:
CITY
EMAIL ADDRESS:
CONTRACTOR:
DATE
48 HOUR NOTICE REQUIRED FOR
INSPECTION AND PRIOR TO START OF WORK
CALL (760) 639-6113
YOU MUST CALL UNDERGROUND SERVICE ALERT AT
(1-800-422-4133)
(2) WORKING DAYS PRIOR TO WORK
UNDERGROUND SERVICE ALERT NO. _________________
THIS PERMIT IS INVALID WITHOUT THIS NUMBER
A CASH SECURITY is required for trench excavation or any work not covered by construction bonds. CASH SECURITY shall be a minimum of $500 or equal to the cost of the proposed improvements within the City's right-of-way. CASH SECURITY may be returned as follows. For deposit amounts greater than $500, ninety percent (90%) of the CASH SECURITY may be returned upon completion and approval of the improvements by the City Engineer or his designee. The remaining ten percent (10%) or a minimum of $500 will be retained for a period of (1) year after the date that the work is completed. CASH SECURITY will be forfeited and used to correct defects, unacceptable work, trench failures or subsidence if corrective work is not completed within (5) working days after notification.
JOB SITE CONTACT:
CELL PHONE #
SIGNATURE
PRINT NAME
CONSTRUCTION PLANS (1 COPY)
LIABILITY INSURANCE (1 COPY)
THE FOLLOWING MUST BE INCLUDED OR EMAILED
WITH PERMIT APPLICATION:
I agree to save, keep and hold harmless the CITY OF VISTA, its officers and agents, from all damages, costs, or expenses in law or equity that may at any time arise or be set up because of damages to property, or of personal injury received by reason of or in the course of performing work, which may be caused by any willful or omission by the contractor, or any of the contractor's employees, or any sub-contractor. The CITY OF VISTA will not be liable for any accident, loss or damage to the work prior to its completion and acceptance.
I am aware of the provisions of Section 3700 of the Labor Code which requires every employer to be insured against liability, for workman’s compensation or to undertake self-insurance in accordance with the provisions of said Labor Code and I will comply with such provisions before commencing the performance of the work of this contract.
I hereby acknowledge that I have read this application and certify that the information given is correct. I agree to comply with all applicable city ordinances, state laws and with the requirements of this permit.
10/27/2026 C3 213 of 424
CITY OF VISTA
Requirements for Encroachment Permits
1. Must have State Contractor’s License.
2. Required License Types: For trenching, only A, C-34, C-36 & C42 allowed Additional License Types may be allowed for Surface Improvements
3. State of California Occupational Safety and Health Permit (CALOSHA).
4. Must submit applicable Underground Service Alert Number, if applicable.
5. Must have valid City of Vista Business License.
6. Must have Workers Compensation Insurance with the City of Vista as Certificate Holder.
7. Must have Liability Insurance with the City of Vista listed as the Certificate Holder and as Additional Insured.
If working in a street or easement, liability amount must be at least $1,000,000.00 For surface improvements - sidewalks or driveways amount must be $500,000.00
8. Must have $1,000,000.00 of pollution liability insurance if doing any work on or within public sewer manholes or public sewer mains.
PLEASE NOTE
Additional Insured Endorsements must be included
as attachments to the Certificate of Liability Insurance ***** Endorsements must cover Ongoing and Completed Operations *****
8. Permit Fee & Required Cash Trust Deposit: Minimum cost of permit is $1,437.00 plus a minimum cash trust deposit of $500.00 or an amount equal to the cost of the improvements being done within the City’s right-of-way. Minimum permit fee covers 3 hours of inspection time and 30 minutes for preconstruction meetings. Additional fees will be due if more than 3 hours of inspection time is required. Trust Deposit may be returned as follows. Ninety percent (90%) of Cash Deposit may be returned upon completion and approval of the improvements by the City Engineer or his designee. The remaining ten percent (10%) or a minimum of $500.00 will be held for a period of one year after the completion and final approval of the work and may be returned if the funds are not required to correct improvement defects, unacceptable surface work and trench failure or subsidence which is not corrected within (5) working days after notification.
APPROVABLE TRAFFIC CONTROL PLANS MUST TO BE SUBMITTED WITH PERMIT APPLICATION. ISSUANCE OF PERMIT MAY BE DELAYED IF NOT SUBMITTED.
TRAFFIC CONTROL PLANS MUST MEET ALL REQUIREMENTS MANDATED WITHIN THE CALIFORNIA MANUAL ON TRAFFIC CONTROL DEVICES.
Version Date 06-29-18
200 Civic Center Drive • Vista, CA 92084 • Ph 760-639-6111 • Fax 760-639-6112
10/27/2026 C3 214 of 424
CITY OF VISTA - Notice
200 Civic Center Drive * Vista, CA 92084 * 760-639-6111 * Fax 760-639-6112 Ver 01-03-19
The following General Conditions shall be considered a part of the City of Vista Encroachment Permit
General
1. Telephone Engineering Inspection at 760-639-6113, 48 hours prior to any work in the City right-of-way.
2. The Encroachment Permit shall be kept on the worksite during all ongoing work with a traffic control plan clearly showing all affected streets and sidewalks and how vehicular and pedestrian traffic is being handled in accordance with standards approved by the City.
3. The traffic control plan must be prepared by either a California licensed Traffic Control Services Consultant (C31 Contractor’s License – Construction Zone Traffic Control Contractor), or be a California registered Traffic or Civil Engineer.
4. The traffic control plan must be in accordance with the latest edition of the California MUTCD or the San Diego Regional Standard Drawings.
5. Traffic control shall be set and maintained per the City approved traffic control plan. Barricades shall be Type II Flashing, with reflectorized delineators and signs, if required for night operations.
Minimum lane width is 11 feet.
6. Flagmen shall have a safety vest with a Stop paddle.
7. No street shall be closed without the approval of the Traffic Engineer pursuant to a City approved traffic control plan.
8. Pedestrian walkway shall be left open or detoured using a minimum four-foot wide safe passage way pursuant to a City approved traffic control plan.
9. Normal working hours are 7:00 a.m. – 5:00 p.m., Monday through Friday unless indicated otherwise on the City approved traffic control plan.
10. Work in the public right-of-way shall be Monday through Friday only. No work is allowed on Saturday, Sunday or City Holidays without prior City approval.
11. Upon permit expiration, all work ceases until a new permit application is submitted and approved.
Existing permit time extensions requests must be submitted prior to expiration date of permit.
12. No construction vehicles shall be parked upon public sidewalks. VCC 10.24.040.
13. Prior to obstructing the ingress/egress of any residential, commercial or industrial site, permittee is required to give property owner and the City 24 hour notice, whenever the permitee’s operations hinders vehicular or pedestrian traffic, whether public or private. The permitee shall construct and maintain such structures as required to provide safe ingress/egress through a construction site. All public and private access restrictions must be clearly shown on the traffic control plan submitted by the contractor for City review and approval.
14. It is the permitee’s responsibility to protect against any dirt or debris from being deposited within the City storm drain system.
15. The permittee is required to immediately comply with all directives issued by the City Inspector to eliminate dust, mud or other site nuisance.
10/27/2026 C3 215 of 424
CITY OF VISTA - Notice
200 Civic Center Drive * Vista, CA 92084 * 760-639-6111 * Fax 760-639-6112 Ver 01-03-19
The following Materials and Standards shall be considered a part of the City of Vista Encroachment Permit
Materials and Standards
1. The permittee is responsible to perform all work and conduct operations per City approved editions of the SSPWC, SDRSD, CITY STDS, CODES, this PERMIT, and all other applicable requirements.
2. No trenches shall be left open overnight. Trenches shall either be plated with temporary AC seal, or backfilled, and have a minimum of 1½” of compacted temporary AC Cold Mix placed.
3. Sidewalk, driveways, wheelchair ramps shall be sawcut to an even line and be removed joint to joint.
4. Curb and gutter and cross gutter shall be removed as directed by the City Inspector.
Concrete removal will require a 1’ asphalt sawcut and repave.
5. Permanent asphalt placement shall be per City of Vista Std. Dwg. SRF-08A & 08B. Cold Planing for Final Cap required for all trenches.
6. All damaged roadway striping shall be replaced in kind.
7. All concrete placed shall be transit mix, unless waived by the City Inspector.
8. Two sack slurry backfill is required when tunneling under curb and gutter.
9. All subgrade (12” depth) and basegrade material shall be compacted to 95 percent density.
Sidewalk sub/base material shall be compacted to 90 percent density. Certification, including compaction testing, shall be provided by the Permitee unless waived by the City Inspector.
10. No excavated material shall be hauled to a site within the City of Vista, without City Inspector knowledge of the end haul location, and the appropriate permits.
11. Any continuous hauling operation will require a City approved Haul Route Permit, prior to commencing the haul. Hauling of dirt/rock etc. without this permit may subject this haul to an immediate Stop Work Notice.
12. Approved City materials for construction include:
a. Asphalt: Surface course – ½” Med. C2-AR-4000-RAP, Min. .10 thick Base course – ¾” Med. B-AR-4000-RAP
Berm – D2-AR-8000
[Performance Grade (PG) asphalt binder PG 64-10 may be substituted for AR-4000 asphalt binder]
b. Concrete for structures – 6/sack 3250 PSA min.
c. Concrete for curb and gutters, sidewalks, driveways – 520-C-2500 min. d. Base material for wheelchair ramps – 6” Class II/Caltrans 26-1.02B e. Street base material – Class II
f. Sidewalk base material – 6” Class II
g. Curing compound on all concrete – Type I SSPWC 303-5.6
All standards are considered minimum and may be revised by the City depending upon field considerations, standards and materials approved on a signed City plan, supercede above materials and standards. It is the permittee’s responsibility to understand and implement all Standards, Codes and other applicable requirements. 10/27/2026 C3 216 of 424
198
Appendix B:
City of Vista Stormwater Management Permit
Application Form & Reference Information
10/27/2026 C3 217 of 424
This information is available in alternate format by request to Joan Turley at (760) 639-6100.
CITY OF VISTA STORMWATER MANAGEMENT PERMIT
INSTRUCTIONS
To accompany all grading and/or building permit application(s).
In order to comply with the federal Clean Water Act, the state Water Code and City Ordinances, the City of Vista requires that property owners and/or contractors complete a Stormwater Management Permit prior to issuance of any grading and/or building permit(s). The purpose of a Stormwater Management Permits to document Best Management Practices (BMPs) that will be implemented to prevent pollutants (including sediment) from entering stormwater conveyances and receiving waters. The Stormwater Management Permit becomes a part of the grading and/or building permit(s) and is subject to enforcement by City of Vista Inspectors and others. Stormwater Management Permits include the elements described in the following sections:
SECTION 1: REQUIRED INFORMATION – This section is used to provide the City with basic information necessary to evaluate and prioritize project activities. Each of the items in this section must be completed, except projects with less than 1 acres of disturbed area are not required to have a Waste Discharge Identification Number (WDID). Grading projects with a disturbed area of greater than 1 acres must also meet additional requirements from the State Water Resources Control Board (SWRCB). Those additional requirements include filing a Notice of Intent (NOI) and preparation of a Stormwater Pollution Prevention Plan (SWPPP). Please note that watercourses and waterbodies include ephemeral drainages (i.e. those that are dry during part of the year). SECTION 2: BEST MANAGEMENT PRACTICES – Best Management Practices (BMPs) must be selected and implemented to prevent erosion and construction-related materials, sediment, wastes and spills from entering stormwater conveyance system and receiving waters.
NOTE: It is the responsibility of the property owner and/or the contractor to determine the types of BMPs that will be used, as well as the levels of application necessary to comply with the City of Vista’s Stormwater and Grading Ordinances. Failure to prevent soil erosion and discharges of sediment and other pollutants from construction sites is subject to enforcement by the City, RWQCB or others.
At a minimum, the City requires that the BMPs designated as required in Table 1 (attached) be installed and maintained for all construction projects, as applicable. Additional BMPs listed in Table 1 may also be required in correlation to a project’s scope, potential for discharges and proximity to a watercourse or other receiving waters. The property owner and/or contractor must complete Table 2 (attached) indicating which BMPs will be used. BMP manuals can be found at the City of Vista’s permit counter. These manuals include all of the referenced BMPs listed in Table 1 from the Caltrans Storm Water Quality Handbooks and the California Stormwater BMP Handbooks.
The entire manuals may also be ordered directly from the following sources:
Caltrans Manuals California Stormwater BMP Handbook Caltrans Publications unit Municipal, Construction & Industrial/Commercial (916) 445-3520 (510) 444-6771 (916) 324-8997 Fax
10/27/2026 C3 218 of 424
This information is available in alternate format by request to Joan Turley at (760) 639-6100.
CITY OF VISTA
STORMWATER MANAGEMENT PERMIT
This form must be submitted with all grading and/or building permit application(s).
SECTION 1. REQUIRED INFORMATION
Grading and/or Building Permit Application Number: Project Name:
Name of Project Contact Person: Project Address or Location:
Title:
Phone #:
Grading Start Date:
Grading Finish Date:
Project Start Date: Project Finish Date: APN NO.
Estimated amount of disturbed acreage:_________ (If equal to or greater than 5 acres, you must also provide a WDID number from the SWRCB) WDID _______________________
Are there any watercourses or waterbodies within 50 feet of the limits of soil disturbance? YES NO Does the project site have or propose slopes higher than 25 feet or steeper than 1:1? YES NO Does the soil type have high erosion potential (fine grain soil like sand, silt, fine disintegrated granite)? YES NO SECTION 2 BEST MANAGEMENT PRACTICES
The goal of stormwater management planning is to reduce pollution to the maximum extent practicable by implementing Best Management Practices (BMPs). There are five categories of BMPs: 1) Erosion control practices, and; 2) Velocity reduction, and; 3) Sediment control practices, and; 4) Offsite sediment tracking control, and; 5) General site and; materials management. BMPs from each of the five categories must be used together as a system in order to prevent erosion, sediment, waste, spills, and residues from leaving the site. When properly implemented, monitored and maintained, BMPs will function to prevent pollutants (including sediment) from leaving the site. It is the responsibility of the property owner and the contractor to determine the types of BMPs that will be used, as well as the levels of application necessary to comply with the City of Vista’s Stormwater and Grading Ordinances.
Best Management Practice Table
Table 1 (attached) must be used to select those BMPs that will be used to prevent stormwater pollution. At a minimum, the City requires that the BMPs designated as required in Table 1 be installed on all construction projects. However, some BMPs may not be applicable to every project. For example, if storm drain inlets are not present, then Storm Drain Inlet Protection (BMP SC10) would not be applicable. Table 2 (attached) must be completed by the project proponent to indicate which BMPs will be used.
Grading and/or Building Plan(s) Best Management Practice Checklist The following applicable information shall be shown on the grading, building and/or erosion control plans:
Project boundaries
Footprint of any existing structures and facilities.
Footprint of all structures and facilities to be constructed. Limits of grading.
Site entrances and exits.
Areas of soil disturbance, cut and/or fill.
Vegetative areas to remain undisturbed.
Designated materials storage areas.
Existing and proposed grades of the site, along with any intermediate grades that will significantly affect site drainage patterns. Location(s) where runoff from the site may enter storm drain(s), channel(s), and/or receiving waters.
Please note that each of the items identified by a check () in Table 1 must be included on the plans, and labeled with the designation found in the tables (for example, SS-7).
SECTION 3. CERTIFICATION
The following certification must be signed before a Grading and/or Building Permit(s) will be issued.
I have read and understand that the City of Vista has adopted minimum requirements for stormwater management of construction activities. I certify that the BMPs I have selected from Table 1 and documented in Table 2 will be implemented to effectively minimize the potentially negative impacts of this project’s construction activities on stormwater quality. I further agree to install monitor, maintain or revise the selected BMPs to ensure their effectiveness.
I also understand that non-compliance with the City of Vista’s Stormwater and Grading Ordinances may result in enforcement by the City, including fines, citation, stop-work orders, cease and desist orders or other actions.
Property Owner /Contractor_________________________________________________ Date ________________________
10/27/2026 C3 219 of 424
This information is available in alternate format by request to Joan Turley at (760) 639-6100.
10/27/2026 C3 220 of 424
This information is available in alternate format by request to Joan Turley at (760) 639-6100.
10/27/2026 C3 221 of 424
This information is available in alternate format by request to Joan Turley at (760) 639-6100.
10/27/2026 C3 222 of 424
This information is available in alternate format by request to Joan Turley at (760) 639-6100.
10/27/2026 C3 223 of 424
City of Del Mar
858-755-9313
City of Encinitas
760-633-2787
City of Carlsbad
760-602-2719
City of San Marcos
760-744-1050
City of Oceanside
760-435-5800
City of Solana Beach
858-720-2470
City of Vista
760-726-134010/27/2026 C3 224 of 424
10/27/2026 C3 225 of 424
199
Appendix C:
Project Sign Example
10/27/2026 C3 226 of 424
Construction schedule:
to
MONTE VISTA STORMDRAIN IMPROVEMENT PROJECT
CIP 8912
Vista City Council
Mayor John Franklin
Deputy Mayor Katie Melendez
Councilmember Joe Green
Councilmember Corinna Contreras
Councilmember Dan O’Donnell
10/27/2026 C3 227 of 424
UPD
A
T
E
10/27/2026 C3 228 of 424
200
Appendix D:
Sample Public Notification Documents
10/27/2026 C3 229 of 424
NOTICE
NAME STREET
IMPROVEMENTS
WORK WILL START IN MONTH YEAR AND CONTINUE UNTIL MONTH YEAR The City of Vista will be constructing storm drain improvements on Street Name.
The construction will require the implementation of traffic control to accommodate the work. Some work may also take place at adjacent driveways, which will temporarily affect access.
The project may cause some inconvenience during construction, but once the work is complete Street Name will have much needed storm drain improvements.
We will endeavor to complete this work as quickly as possible and with a minimum of inconvenience to you. Thank you for your understanding and cooperation during the construction of this project.
If you have any questions about the project or any concerns during construction, please contact one of the individuals below:
Construction Contractor
Name
Company
Phone number
City Inspector
Name
Engineering Department
(760)643-5384
@cityofvista.com
10/27/2026 C3 230 of 424
NOTIFICACION
Movilidad Peatonal 2020
Proyecto de Banquetas
El trabajo comenzara MONTH YEAR y terminará MONTH YEAR
La ciudad de Vista ha contratado a ____________ de ____________, CA para la construcción de banquetas y entradas por las siguientes calles:
Street Name
La construcción requiere control de tráfico para poder trabajar. Las entradas y tráfico peatonal en las áreas mencionadas anteriormente serán temporalmente afectadas.
El acceso vehicular en el área de construcción también será temporalmente afectado, pero las calles se mantendrán abiertas al tráfico.
Esperamos completar este trabajo lo más pronto posible con mínimas molestias. Le agradecemos su comprensión y cooperación durante la construcción de este proyecto.
Si tiene alguna pregunta o preocupación durante la construcción, por favor c omuníquese con cualquiera de las siguientes personas:
Gerente del Proyecto Inspector de la Ciudad Contratista de Construcción Name Name Name
Departamento de Ingeniería Departamento de Ingeniería Company (760)643-____________(760)726-1340 x-____Phone number
[email protected] [email protected] E-mail address Atentamente,
Gerente del Proyecto para la Ciudad, Name
Ciudad de Vista, Departamento de Ingeniería
10/27/2026 C3 231 of 424
201
Appendix E:
City of Vista Standard Drawings
The complete City of Vista Standard Drawing can be downloaded here:
https://www.vista.gov/home/showpublisheddocument/20105/638882 808307500000
10/27/2026 C3 232 of 424
202
Appendix F:
San Diego Regional Standard Drawings
The complete San Diego Regional Standard Drawings can be downloaded here:
https://www.sandiegocounty.gov/content/sdc/dpw/CIP/regional- stds.html
10/27/2026 C3 233 of 424
203
Appendix G:
Project Geotechnical Report
10/27/2026 C3 234 of 424
4373 Viewridge Avenue
Suite B
San Diego, California 92123
858.292.7575
16610 Aston Street
Irvine, CA 92606
949.388.7710
usa-nova.com
NOVA Project No. 3024048
February 7, 2025
Sewer Capacity Improvements
Projects CIP 8381 and CIP 8382
Vista, California
Submitted to:
REC Consultants, Inc.
2970 Fifth Avenue, Suite 340
San Diego, CA 92103
REPORT
GEOTECHNICAL INVESTIGATION
10/27/2026 C3 235 of 424
GEOTECHNICAL
MATERIALS
SPECIAL INSPECTION DVBE SBE SDVOSB
4373 Viewridge Avenue, Suite B
San Diego, CA 92123
P: 858.292.7575
usa-nova.com 16610 Aston Street
Irvine, CA 92606
P: 949.388.7710
M. J. Hernandez February 12, 2025
REC Consultants, Inc. NOVA Project No. 3024048
2970 Fifth Avenue, Suite 340
San Diego, CA 92103
Subject: Report
Geotechnical Investigation
Sewer Capacity Improvements, Projects CIP 8381 and CIP 8382 Vista, California
Dear Ms. Hernandez:
NOVA Services, Inc. (NOVA) is pleased to present its report describing a geotechnical investigation for two proposed sewer capacity improvements. As is noted in the report, the subsurface information obtained for site 8382 is inadequate. For this reason, this report is labeled ‘DRAFT.’ NOVA recommends re-mobilization of a subsurface exploration to better characterize the subsurface along this alignment. Once that effort is complete, the report will be finalized.
NOVA appreciates the opportunity to be of continued service to REC Consultants, Inc. If you have any questions regarding this report, please do not hesitate to call us at 949.388.7710.
Sincerely,
NOVA Services, Inc.
_________________________ _________________________ Sam Bergeland Paul Kim, GE, CEG
Staff Geologist Principal Engineer
_________________________ _________________________ Juan Sempertegui, EIT John F. O’Brien, PE, GE
Staff Engineer Principal Engineer
10/27/2026 C3 236 of 424
DRAFT Report of a Geotechnical Investigation
Sewer Capacity Improvements, Vista, CA
NOVA Project No. 3024048
February 12, 2025
i
DRAFT Report
Geotechnical Investigation
Sewer Capacity Improvements, Projects CIP 8381 and CIP 8382 Vista, California
TABLE OF CONTENTS
1. INTRODUCTION ............................................................................................................ 1
1.1. Terms of Reference .......................................................................................................... 1
1.2. Objectives and Limitations of This Work ........................................................................... 1
1.2.1 Objectives ............................................................................................................ 1
1.2.2 Limitations ........................................................................................................... 1
1.3. Understood Use of This Report ......................................................................................... 1
1.4. Report Organization .......................................................................................................... 1
2. BACKGROUND ............................................................................................................. 3
2.1. Overview .......................................................................................................................... 3
2.2. Project CIP 8381- Via Centre ............................................................................................ 3
2.2.1 Surface Gradients ................................................................................................ 5
2.3. Project CIP 8382- Santa Fe Avenue ................................................................................. 5
3. SUBSURFACE EXPLORATION AND LABORATORY TESTING ................................ 6
3.1. Engineering Borings ......................................................................................................... 6
3.1.1 General ................................................................................................................ 6
3.1.2 Logging and Sampling the Borings ...................................................................... 7
3.2. Laboratory Testing ............................................................................................................ 8
4. GEOLOGY AND SUBSURFACE CONDITIONS ........................................................... 9
4.1. Regional Geology ............................................................................................................. 9
4.2. Site-Specific Geology- CIP 8381 Via Centre ................................................................... 10
4.2.1 Soil and Rock .................................................................................................... 10
4.2.2 Groundwater ...................................................................................................... 11
4.3. Site-Specific Geology- CIP 8382 Santa Fe ..................................................................... 11
4.3.1 Soil and Rock .................................................................................................... 11
4.3.2 Groundwater ...................................................................................................... 11 10/27/2026 C3 237 of 424
DRAFT Report of a Geotechnical Investigation
Sewer Capacity Improvements, Vista, CA
NOVA Project No. 3024048
February 12, 2025
ii
5. GEOLOGIC HAZARDS ................................................................................................ 12
5.1. Faulting and Surface Rupture ......................................................................................... 12
5.2. Liquefaction .................................................................................................................... 13
5.3. Landslides and Slope Stability ........................................................................................ 14
5.4. Inundation ....................................................................................................................... 14
5.4.1 Flood- Via Center, Site 8381 .............................................................................. 14
5.4.2 Flood- Santa Fe Avenue, Site 8382 ................................................................... 14
5.4.3 Tsumani and Seiche .......................................................................................... 15
5.5. Subsidence ..................................................................................................................... 15
6. CONCLUSIONS ........................................................................................................... 16
7. RECOMMENDATIONS ................................................................................................ 17
7.1. Earthwork ....................................................................................................................... 17
7.1.1 Site Preparation ................................................................................................. 17
7.1.2 Excavation Characteristics ................................................................................. 17
7.1.3 Temporary Excavations ..................................................................................... 17
7.1.4 Temporary Shoring ............................................................................................ 18
7.1.5 Groundwater Seepage ....................................................................................... 18
7.2. Pipelines ......................................................................................................................... 18
7.2.1 Modulus of Soil Reaction ................................................................................... 18
7.2.2 Pipe Bedding ..................................................................................................... 19
7.2.3 Trench Backfill ................................................................................................... 19
7.2.4 Trench Resurfacing ........................................................................................... 20
7.2.5 Thrust Blocks ..................................................................................................... 20
7.3. Corrosivity....................................................................................................................... 20
7.4. Additional Borings for Site 8382 ...................................................................................... 20
8. CLOSURE .................................................................................................................... 21
9. REFERENCES ............................................................................................................. 22
List of Figures
Figure 1-1. Site Vicinity Map
Figure 1-2. Site Location Map
Figure 2-1. Subsurface Exploration Map – Via Centre
Figure 2-2. Subsurface Exploration Map – Santa Fe Avenue 10/27/2026 C3 238 of 424
DRAFT Report of a Geotechnical Investigation
Sewer Capacity Improvements, Vista, CA
NOVA Project No. 3024048
February 12, 2025
iii
Figure 3-1. Geologic Compilation of Quaternary Surficial Deposits of Southern California – Via Centre
Figure 3-2. Geologic Compilation of Quaternary Surficial Deposits of Southern California – Santa Fe Avenue
Figure 4-1. Faulting in the Site Vicinity
Figure 4-2. California Department of Conservation Seismic Hazard Zones Figure 4-3. FEMA Flood Map – Via Centre
Figure 4-4. FEMA Flood Map – Santa Fe Avenue
List of Plates
Plates 1 & 2 Geotechnical Map
Plate 3 Geotechnical Cross Section
List of Appendices
Appendix A Use of the Geotechnical Report
Appendix B Boring Logs
Appendix C Laboratory Testing
10/27/2026 C3 239 of 424
DRAFT Report of a Geotechnical Investigation
Sewer Capacity Improvements, Vista, CA
NOVA Project No. 3024048
February 12, 2025
1 1. INTRODUCTION
1.1. Terms of Reference
This report presents the findings of a geotechnical investigation by NOVA Services, Inc. (NOVA) for two sewer capacity improvement projects in the City of Vista that are known to NOVA as CIP 8381 and CIP 8382. The work reported herein was completed by NOVA for REC Consultants, Inc. (REC) in general accordance with the scope of work identified in NOVA’s July 3, 2024, proposal.
1.2. Objectives and Limitations of This Work
1.2.1 Objectives
The objective of the work reported herein is to characterize the subsurface along the alignments of each of the sewer capacity improvement projects in a manner sufficient to provide recommendations related for design and construction of the geotechnical-related aspects of each of the projects.
1.2.2 Limitations
The construction recommendations included in this report are not final. These recommendations are developed by NOVA using judgment and opinion and based upon the limited information available from the engineering borings. NOVA can finalize its recommendations only by observing actual subsurface conditions revealed during construction. NOVA cannot assume responsibility or liability for the recommendations of this report if NOVA does not perform construction observations.
1.3. Understood Use of This Report
NOVA expects that the findings and recommendations provided herein will be utilized by REC in decision-making regarding design and construction of the geotechnical related aspects of the planned sewer improvements considered by this work.
NOVA’s recommendations are based on its current understanding and assumptions regarding project development. Design is only at preliminary stages. Effective use of this report should include coordination with NOVA during design and review by NOVA of the final design. Such review is important for both (i) conformance with the recommendations provided herein, and (ii) consistency with NOVA’s understanding of the sewer upgrades.
1.4. Report Organization
The remainder of this report is organized as described below. • Section 2 reviews the presently available project information. • Section 3 describes the subsurface exploration and the results of the related laboratory testing. • Section 4 describes geologic and soil conditions at each of the projects. • Section 5 reviews geologic and soil hazards at each of the projects. 10/27/2026 C3 240 of 424
DRAFT Report of a Geotechnical Investigation
Sewer Capacity Improvements, Vista, CA
NOVA Project No. 3024048
February 12, 2025
2 •Section 7 provides recommendations for design, earthwork and construction of the sewer improvements.
•Section 8 lists the principal references cited or employed in this report.
Plates depicting the locations of borings completed for this work are attached immediately following the report text.
The report is supported by three appendices. Appendix A provides guidance regarding the use and limitations of this report. Appendix B presents logs of the engineering borings. Appendix C provides records of the laboratory testing
10/27/2026 C3 241 of 424
DRAFT Report of a Geotechnical Investigation
Sewer Capacity Improvements, Vista, CA
NOVA Project No. 3024048
February 12, 2025
3 2. BACKGROUND
2.1. Overview
As previously noted, this report addresses geotechnical evaluations related to two sewer capacity improvement projects in the City of Vista. Those projects are referenced by the City of Vista as CIP 8381 and CIP 8382. At completion, the work associated with these projects will upsize certain sewer lines to provide for improvements in sewer capacity.
Review of plans provided by within the City of Vista RFP for CIP 8381 and CIP 8382 indicates the project will consist of the upsizing and/or relocation of a total of approximately 1,435 feet of sewer line located within the public roadways within the City of Vista. • CIP 8381- Via Centre. This work will upsize an approximately 685 feet long sewer located on West Villa Way, crossing CA State Route 78 to Hacienda Drive, and continuing through Via Centre. The portion of the proposed sewer line crossing SR-78 will require trenchless construction.
• CIP 8382. This work will upsize and/or relocate an approximately 750 feet long sewer located on south Santa Fe Avenue at the intersection of Civic Centre Drive Both of the sites lie within paved public roadways in the form of public streets or portions of the 78 freeway. The sites are generally bounded on all sides by public sidewalk areas and adjacent single- story commercial structures utilized by the local businesses.
The following subsections describe each of the sewer projects in more detail.
2.2. Project CIP 8381- Via Centre
Via Centre is the continuation of a previously constructed capacity project that replaced and upsized sewer infrastructure to the east along W. Vista Way. The project will connect to the previously constructed improvements at W. Vista Way at Nettleton Rd. and will continue to the south across (under) SR-78, through Hacienda Dr., and extend south on Via Centre. The capacity analysis of the approximately 625’ existing 10” and 12” sewer mains show a potential for surcharge in existing peak wet weather high flow conditions. As currently planned, the project will consist of renovations to existing sewer lines.
Due to the depth of sewer mains and complexity of crossing a major freeway, it is anticipated this project will require a trenchless method of construction to cross the freeway and permitting through CalTrans right-of-way
Figures 2-1 depicts the site vicinity. Figure 2-2 shows the site on a recent aerial image. 10/27/2026 C3 242 of 424
DRAFT Report of a Geotechnical Investigation
Sewer Capacity Improvements, Vista, CA
NOVA Project No. 3024048
February 12, 2025
4 Figure 2-1. Site Vicinity– W. Vista Way
Figure 2-2. Sewer Alignment– W. Vista Way
10/27/2026 C3 243 of 424
DRAFT Report of a Geotechnical Investigation
Sewer Capacity Improvements, Vista, CA
NOVA Project No. 3024048
February 12, 2025
5 2.2.1 Surface Gradients
The Via Centre site is relatively level with a slight gradient of change shown in elevations ranging from +230 feet mean sea level(msl) to +216 feet msl descending to the southeast.
2.3. Project CIP 8382- Santa Fe Avenue
This site is aligned along Santa Fe Ave. NOVA was not able to penetrate borings in this area due to refusal by unmarked buried utilities.
Figure 2-3. Site Vicinity– Santa Fe Avenue
Figure 2-4. Sewer Alignment– Santa Fe Avenue
10/27/2026 C3 244 of 424
DRAFT Report of a Geotechnical Investigation
Sewer Capacity Improvements, Vista, CA
NOVA Project No. 3024048
February 12, 2025
6 3. SUBSURFACE EXPLORATION AND LABORATORY TESTING
3.1. Engineering Borings
3.1.1 General
NOVA’s field investigation consisted of drilling five borings (B-1 through B-5) using a truck-mounted drill rig equipped with a hollow stem auger. The borings were drilled at locations as follows:
1. Site CIP 8381. Three borings (B-1 through B-3) were drilled to depths of approximately 31 feet below ground surface (bgs). In addition, a single boring was refused in the near subsurface.
2. Site CIP 8382. NOVA was not able to penetrate borings in this area due to refusal by unmarked buried utilities. Attempts were made at 4 locations, as indicated on Figure 2-2.
Figures 3-1 and 3-2 present the approximate subsurface exploration locations Plate 1 presents the exploration locations on a larger scale.
Figure 2 site location Map – Via Centre
10/27/2026 C3 245 of 424
DRAFT Report of a Geotechnical Investigation
Sewer Capacity Improvements, Vista, CA
NOVA Project No. 3024048
February 12, 2025
7 Figure 2-2. Subsurface Exploration Map – Santa Fe Avenue
3.1.2 Logging and Sampling the Borings
A NOVA geologist logged the borings and collected samples of the materials encountered for laboratory testing. Relatively undisturbed samples were obtained using a modified California (CAL) sampler, a ring-lined split tube sampler with a 3-inch outer diameter and 2½-inch inner diameter.
Standard Penetration Tests (SPT) were performed in the borings using a 2-inch outer diameter and 1⅜-inch inner diameter split tube sampler.
The CAL and SPT samplers were driven using an automatic hammer with a calibrated Energy Transfer Ratio (ETR) of 79.6%. The number of blows needed to drive the sampler 18 inches is noted in three, 6-inch intervals on the logs. Sampler refusal was encountered when 50 blows were applied during any one of the three 6-inch intervals, a total of 100 blows was applied, or there was no discernible sampler advancement during the application of ten successive blows. The field blow counts, N, were corrected to a standard hammer (cathead and rope) with a 60% ETR. The corrected blow counts are noted on the boring logs as N60. Disturbed bulk samples were obtained from the SPT sampler and the drill cuttings.
Appendix B presents logs of the borings. Soils are classified according to the Unified Soil Classification System.
10/27/2026 C3 246 of 424
DRAFT Report of a Geotechnical Investigation
Sewer Capacity Improvements, Vista, CA
NOVA Project No. 3024048
February 12, 2025
8 3.2. Laboratory Testing
NOVA tested selected samples from the borings to evaluate soil classification and engineering properties and develop geotechnical conclusions and recommendations. The laboratory tests consisted of in-place dry density and moisture content, Atterberg limits, R-value, gradation analysis, and corrosivity.
Appendix C presents the results of the laboratory tests and brief explanations of the test procedures.
10/27/2026 C3 247 of 424
DRAFT Report of a Geotechnical Investigation
Sewer Capacity Improvements, Vista, CA
NOVA Project No. 3024048
February 12, 2025
9 4. GEOLOGY AND SUBSURFACE CONDITIONS
4.1. Regional Geology
Vista is located within the Peninsular Ranges Geomorphic Province of California, which extends into lower California, bounded to the east by the Colorado Desert. This province is characterized as a series of ranges separated by northwest trending valleys, subparallel to faults branching from the San Andreas Fault. The trend of topography is similar to coastal ranges and consists of granitic rock intruding the older metamorphic rock.
Both CIP 8381 and CIP 8382 are located within the western portion of the province. Site CIP 8381 is underlain by Quaternary alluvial deposits and Tertiary formations. While site 8382 is underlain is underlain by Cretaceous bedrock.
Figures 3-1 and 3-2 reproduce geologic mapping of the vicinity of each site.
Figure 3-1. Geologic Mapping, CIP 8381 Via Centre
10/27/2026 C3 248 of 424
DRAFT Report of a Geotechnical Investigation
Sewer Capacity Improvements, Vista, CA
NOVA Project No. 3024048
February 12, 2025
10 Figure 3-2. Geologic Mapping, CIP 8382, Santa Fe Avenue
4.2. Site-Specific Geology- CIP 8381 Via Centre
4.2.1 Soil and Rock
The subsurface investigation indicates that the is underlain by minor fill, alluvial deposits, and formational materials in the form of siltstone deposits. The description of the material encountered in the borings is presented below. The boring logs in Appendix B present site-specific geology.
Fill (af): Fill was encountered in all three borings with an approximate thickness of up to about 10 feet. As encountered in the borings, the fill generally consists of slightly moist to moist, loose to medium dense silty sand/clayey sand as well as stiff to very stiff clay/sandy clay. NOVA has no records regarding the placement and compaction of the fill.
Alluvial Flood Plain Deposits (Qa): The fill was found to be underlain by Quaternary-aged Alluvium. As encountered in the borings, the alluvium consists of gray to brown, very stiff, clay/sandy clay/silty clay and brown, medium dense, clayey sand and silty sand.
Santiago Formation (Tsa): Below the alluvium, the site within CIP 8381 is underlain by Tertiary-aged formation in the form of the Santiago Formation. As encountered in the borings, the formation is sampled as gray/bluish gray to greenish gray, hard, siltstone/claystone. 10/27/2026 C3 249 of 424
DRAFT Report of a Geotechnical Investigation
Sewer Capacity Improvements, Vista, CA
NOVA Project No. 3024048
February 12, 2025
11 4.2.2 Groundwater
Groundwater was not encountered in any of the borings to a depth of 26 feet. Based on the review of limited nearby wells reported by the California Department of Water Resources, there are no comparable water wells to determine groundwater levels within the vicinity of the site.
4.3. Site-Specific Geology- CIP 8382 Santa Fe
4.3.1 Soil and Rock
As previously discussed, NOVA was not able to penetrate borings in this area due to refusal by unmarked buried utilities. However, based upon experience at other sites in the vicinity of this project, it is expected that the alignment of the sewer in this area is underlain by minor fill, rock-like formational materials. The description of the material is presented below. The borings logs in Appendix B presents site-specific geology.
Fill (af): Fill is expected to mantle the project area beneath the pavement. NOVA borings did not extend deep enough due to refusal by unmarked utilities. The encountered fill generally consisted of clayey sands that were slightly moist to moist and likely of medium dense quality.
Tonalite (Kt). Based on review of geologic maps and geotechnical reports from adjacent sites, NOVA anticipates tonalite will underlie the fill over much of this area. The excavability of the tonalite is unknown. NOVA suggests that the contractor perform potholes at several locations along the sewer line alignment to better understand how dense is the rock and what type of equipment is needed to excavate to planned depths. Unweathered zones will require extra effort and time to remove from the surrounding more weathered rock.
4.3.2 Groundwater
Groundwater was not encountered in any of the borings to a depth of 5 feet. Based on the review of limited nearby wells reported by the California Department of Water Resources, there are no comparable water wells to determine groundwater levels within the vicinity of the site.
10/27/2026 C3 250 of 424
DRAFT Report of a Geotechnical Investigation
Sewer Capacity Improvements, Vista, CA
NOVA Project No. 3024048
February 12, 2025
12 5. GEOLOGIC HAZARDS
5.1. Faulting and Surface Rupture
Major known active faults in the region consist generally of en echelon, northwest striking, reverse and concealed faults. These include the Newport-Inglewood-Rose Canyon Fault Zone and Coronado Bank Fault Zone located west of the site, and the Temescal Fault and Elsinore Fault Zone, located to the east and south of the site.
Earthquake Fault Zones have been established along known active faults in California in accordance with the Alquist-Priolo Earthquake Fault Zoning Act. The State Geologist defines an “active” fault as one which has had surface rupture within recent geologic time (i.e., Holocene time, <11,700 years b.p.). Earthquake Fault Zones have been delineated to encompass traces of known Holocene-active faults to address hazards associated with fault surface rupture within California. Where developments for human occupancy are proposed within these zones, the state requires detailed fault evaluations be performed so that engineering geologists can identify the locations of active faults and recommend setbacks from locations of possible surface fault rupture.
The site is not located in the Alquist-Priolo Earthquake Fault Zone. No active surface faults are mapped across the site. Evidence of active faulting was not observed at the site during our field investigation. The probability of fault rupture is considered low. Figure 4-1 shows the locations of known faults in the site vicinity.
Figure 4-1. Faulting in the Site Vicinity
10/27/2026 C3 251 of 424
DRAFT Report of a Geotechnical Investigation
Sewer Capacity Improvements, Vista, CA
NOVA Project No. 3024048
February 12, 2025
13 5.2. Liquefaction
Liquefaction occurs when loose, saturated, generally fine sands and silts are subjected to strong ground shaking. The soils lose shear strength and become liquid, resulting in large total and differential ground surface settlements, as well as possible lateral spreading during an earthquake.
The California Department of Conservation does not extend its Seismic Hazard Zonation Program to San Diego County. However, review of County of San Diego guidelines published by the Department of Public Works Land Use and Environment group, shows the site is not located within a designated zone for liquefaction. Furthermore, due to lack of shallow groundwater and presence of shallow formational materials, the site has a low risk potential for liquefaction. Figure 4-2 shows the locations of liquefaction hazard zones in the site vicinity.
Figure 4-2. San Diego County Geologic Hazards – Potential Liquefaction Areas
10/27/2026 C3 252 of 424
DRAFT Report of a Geotechnical Investigation
Sewer Capacity Improvements, Vista, CA
NOVA Project No. 3024048
February 12, 2025
14 5.3. Landslides and Slope Stability
No evidence of landsliding or other slope instability was not observed at the time of NOVA’s field evaluation at either of the two sites. Both sites are relatively level. Additionally, there are no mapped landslides in the vicinity of either project site in both published geologic maps and the California Department of Conservation Landslide Inventory database.
The potential for landslides or slope instabilities to occur at either site is considered very low given the flat topography, and flat-lying geological structure below the site.
5.4. Inundation
5.4.1 Flood- Via Center, Site 8381
The Via Centre site is mapped within Zone X (FEMA, 2012), which are areas of minimal flood hazard.
As such, the risk of a flood to affect the site is considered low. Figure 4-3 shows the flood zone mapped within the Via Centre site vicinity mapped by the Federal Emergency Management Agency.
Figure 4-3. FEMA Flood Map- Via Centre, Site 8381
5.4.2 Flood- Santa Fe Avenue, Site 8382
The Santa Fe Avenue site is mapped within Zone AH (FEMA, 2012), which are special flood hazard areas subject to inundation by the 1% annual chance flood with noted flood depths of 1 to 3 feet. As such, the risk of a flood affecting the site should be accounted for by design measures. Figure 4-4 10/27/2026 C3 253 of 424
DRAFT Report of a Geotechnical Investigation
Sewer Capacity Improvements, Vista, CA
NOVA Project No. 3024048
February 12, 2025
15 shows the flood zone mapped within the Santa Fe Avenue site vicinity mapped by the Federal Emergency Management Agency.
Figure 4-4. FEMA Flood Map –Santa Fe Avenue, Site 8382
5.4.3 Tsumani and Seiche
Neither site is located within a mapped area on the State of California Tsunami Inundation Maps (CGS, 2022); therefore, the potential for damage due to tsunamis is considered low.
Seiches are periodic oscillations in large bodies of water such as lakes, harbors, bays, or reservoirs.
Neither site is located adjacent to any lakes or confined bodies of water; therefore, the potential for a seiche to affect the site is considered low.
5.5. Subsidence
Neither site is not located in an area of known subsidence associated with fluid withdrawal (groundwater or petroleum); therefore, the potential for subsidence due to the extraction of fluids is considered very low.
10/27/2026 C3 254 of 424
DRAFT Report of a Geotechnical Investigation
Sewer Capacity Improvements, Vista, CA
NOVA Project No. 3024048
February 12, 2025
16 6. CONCLUSIONS
Based on the results of NOVA’s investigation, NOVA considers the proposed construction feasible from a geotechnical standpoint provided the recommendations contained in this report are followed.
Geotechnical conditions exist that should be addressed prior to construction. Geotechnical design and construction considerations include the following.
• There are no known active faults underlying the site. The primary seismic hazard at the site is the potential for moderate to severe ground shaking in response to large-magnitude earthquakes generated during the lifetime of the proposed construction. The risk of strong ground motion is common to all construction in southern California and is typically mitigated through building design in accordance with the CBC. Liquefaction potential is considered low. • An additional geologic hazard at the site is flooding. Evaluation of this hazard is beyond the scope of this work. Appropriate drainage devices should be employed to collect stormwater and transport it away from the project area. This can aid in minimizing the adverse effects from flooding.
• Site 8381 is underlain by fill, alluvial deposits and very dense Santiago Formation. • NOVA was not able to penetrate borings along site 8382 due to refusal by unmarked buried utilities. However, based upon experience of sites in the area, this site is expected to be overlain by fill and below which lies tonalite. Weathering of this rock unit diminishes with depth, such that relatively sound rock may be expected to occur at shallow depths. • In general, excavations within the fill and alluvium should be achievable using standard trenching equipment in good working order with experienced operators. The materials within the Santiago Formation and the Tonalite may be difficult and may require heavy duty equipment or heavy-duty rock rippers. The rippability of the formation was not a part of NOVA’s scope of work. Additional investigation and evaluation will be needed to assess the rippability of the formational and Tonalite materials.
• Groundwater was not encountered in NOVA’s borings. The permanent groundwater table is at deep enough levels not expected to be a constraint to development. However, groundwater seepage may develop in the future. These conditions can be mitigated if they occur. • The subsurface information obtained for site 8382 is inadequate. NOVA recommends re- mobilization of a subsurface exploration to better characterize the subsurface along this alignment.
10/27/2026 C3 255 of 424
DRAFT Report of a Geotechnical Investigation
Sewer Capacity Improvements, Vista, CA
NOVA Project No. 3024048
February 12, 2025
17 7. RECOMMENDATIONS
The remainder of this report presents recommendations regarding earthwork construction as well as preliminary geotechnical recommendations for the design of the proposed pipelines. These recommendations are based on empirical and analytical methods typical of the standard-of-practice in southern California. If these recommendations appear not to address a specific feature of the project, please contact NOVA for additions or revisions to the recommendations. The recommendations presented herein may need to be updated once final plans are developed.
7.1. Earthwork
Earthwork is anticipated to include excavations for underground utilities, placement and compaction of backfill and trenchless construction likely done by the jack and bore method. Grading and earthwork should be conducted in accordance with the CBC and the recommendations of this report. The following recommendations are provided regarding specific aspects of the proposed earthwork construction. These recommendations should be considered subject to revision based on field conditions observed by a NOVA field representative during grading.
7.1.1 Site Preparation
Site preparation should begin with the removal of existing improvements and debris. Subsurface improvements that are to be abandoned should be removed, and the resulting excavations should be backfilled and compacted in accordance with the recommendations of this report. Pipeline abandonment can consist of capping or rerouting at the project perimeter and removal within the project perimeter. If appropriate, abandoned pipelines can be filled with grout or slurry as recommended by and observed by the geotechnical consultant.
7.1.2 Excavation Characteristics
It is anticipated that excavations for pipeline alignments and jacking/receiving pits within the fill and alluvium can be achieved with conventional earthwork equipment in good working order. The materials within the Santiago Formation and the Tonalite may be difficult and may require heavy duty equipment or heavy-duty rock rippers. The rippability of the formation was not a part of NOVA’s scope of work.
Additional investigation and evaluation will be needed to assess the rippability of the formational and Tonalite materials.
7.1.3 Temporary Excavations
Temporary excavations 4 feet deep or less can be made vertically. Deeper temporary excavations in fill should be laid back no steeper than 1:1 (horizontal:vertical) (h:v). If cohesionless, poorly graded sands are encountered, temporary excavations should be laid back no steeper than 1½:1 (h:v) with no allowances of a vertical cut. The faces of temporary slopes should be inspected daily by the contractor’s Competent Person before personnel are allowed to enter the excavation. Any zones of potential instability, sloughing, or raveling should be brought to the attention of the engineer and corrective action implemented before personnel begin working in the excavation. 10/27/2026 C3 256 of 424
DRAFT Report of a Geotechnical Investigation
Sewer Capacity Improvements, Vista, CA
NOVA Project No. 3024048
February 12, 2025
18 Due to constraints from existing improvements, excavations may utilize shoring. Soldier piles and lagging, corrugated metal pipe, internally braced shoring, or trench boxes could be used. If trench boxes or corrugated metal pipes are used, the soil immediately adjacent to the shoring is not directly supported. Ground surface deformations immediately adjacent to the pit or trench could be greater where trench boxes are used compared to other methods of shoring. Specific recommendations can be provided during construction, where existing conditions can be documented.
Excavated soils should not be stockpiled behind temporary excavations within a distance equal to the depth of the excavation. NOVA should be notified if other surcharge loads are anticipated so that lateral load criteria can be developed for the specific situation. If temporary slopes are to be maintained during the rainy season, berms are recommended along the tops of slopes to prevent runoff water from entering the excavation and eroding the slope faces.
7.1.4 Temporary Shoring
For design of cantilevered shoring, an active soil pressure equal to a fluid weighing 45 pounds per cubic feet (pcf) can be used for level retained ground or 65 pcf for 2:1 (h:v) sloping ground. The surcharge loads on shoring from traffic and construction equipment adjacent to the excavation can be modeled by assuming an additional 2 feet of soil behind the shoring. For design of soldier piles within the alluvium, an allowable passive pressure of 250 pounds per square foot (psf) per foot of embedment over twice the pile diameter up to a maximum of 2,500 psf can be used. For the portion of soldier piles within the formational materials, an allowable passive pressure of 400 pounds per square foot (psf) per foot of embedment over twice the pile diameter up to a maximum of 4,000 psf can be used. Soldier piles should be spaced at least three pile diameters, center to center. Continuous lagging will be required throughout. The soldier piles should be designed for the full anticipated lateral pressure; however, the pressure on the lagging will be less due to arching in the soils. For design of lagging, the earth pressure can be limited to a maximum value of 400 psf.
Piles should be filled with concrete immediately after drilling. The concrete should be pumped to the bottom of the drilled holes using the tremie method. If casing is used, the casing should be removed as the concrete is placed, keeping the level of the concrete at least 5 feet above the bottom of the casing at all times.
7.1.5 Groundwater Seepage
Seepage from perched groundwater may occur locally in excavations. If dewatering is necessary, the dewatering method should be evaluated and implemented by an experienced dewatering subcontractor.
7.2. Pipelines
7.2.1 Modulus of Soil Reaction
A modulus of soil reaction (E’) of 400 psi can be used to evaluate the deflection of buried flexible pipelines. This value assumes that granular bedding material is placed adjacent to the pipe and is compacted to at least 90% relative compaction. For buried pipes buried within formational materials, a modulus of soil reaction (E’) of 4,000 psi can be used 10/27/2026 C3 257 of 424
DRAFT Report of a Geotechnical Investigation
Sewer Capacity Improvements, Vista, CA
NOVA Project No. 3024048
February 12, 2025
19 7.2.2 Pipe Bedding
Pipe bedding as specified in the “Greenbook” Standard Specifications for Public Works Construction can be used. Bedding material should consist of clean sand having a sand equivalent not less than 30 and should extend to at least 12 inches above the top of pipe. Alternative materials meeting the intent of the bedding specifications are also acceptable. Samples of materials proposed for use as bedding should be provided to the engineer for inspection and testing before the material is imported for use on the project. The on-site materials are not expected to meet “Greenbook” bedding specifications. The pipe bedding material should be placed over the full width of the trench. After placement of the pipe, the bedding should be brought up uniformly on both sides of the pipe to reduce the potential for unbalanced loads. No voids or uncompacted areas should be left beneath the pipe haunches. Ponding or jetting the pipe bedding should not be allowed.
Where pipeline inclinations exceed 15%, cutoff walls are recommended in trench excavations.
Additionally, we do not recommend that open graded rock be used for pipe bedding or backfill because of the potential for piping erosion. The recommended bedding is clean sand having a sand equivalent not less than 20 or 2-sack sand/cement slurry. If sand/cement slurry is used for pipe bedding to at least 1 foot over the top of the pipe, cutoff walls are not considered necessary. The need for cutoff walls should be further evaluated by the project civil engineer designing the pipeline.
7.2.3 Trench Backfill
Utility trench sections should conform to the minimum requirements of the City of Vista and/or San Diego county regional standards. In our opinion, the excavated on-site material will not meet the requirement of granular backfill or flowable fill. In addition, the on-site material will not meet the most recent edition of the Greenbook, which states that trench backfill material should have a sand equivalent (SE) greater than 20.
Backfill should be placed in 6-inch to 8-inch-thick loose lifts, moisture conditioned to above the optimum moisture content and compacted to at least 90% relative compaction of the material’s maximum dry density. Where trench backfill is to be placed on surfaces inclined steeper than 5:1 (h:v), benches should be excavated to provide a relatively level surface for fill placement. Benches should extend through any loose soils to expose competent material.
The top 12 inches of trench backfill beneath paved areas should be moisture conditioned to above the optimum moisture content and compacted to at least 95% relative compaction of the material’s maximum dry density. Aggregate base material should be compacted to at least 95% relative compaction. Materials and methods of construction should conform to good engineering practices and the City of Vista Design Standards.
The maximum dry density and optimum moisture content for the evaluation of relative compaction should be determined in accordance with ASTM D1557. It should be noted that maximum dry density and optimum moisture content is dependent on the properties of the selected material. 10/27/2026 C3 258 of 424
DRAFT Report of a Geotechnical Investigation
Sewer Capacity Improvements, Vista, CA
NOVA Project No. 3024048
February 12, 2025
20 7.2.4 Trench Resurfacing
Trench resurfacing (pavement replacement) should conform to the minimum requirements of the City of Vista.
7.2.5 Thrust Blocks
For level ground conditions, a passive earth pressure of 250 psf per foot of depth below the lowest adjacent final grade can be used to compute allowable thrust block resistance. A value of 120 psf per foot should be used below groundwater level, if encountered. Within formational materials, a passive pressure of 400 psf per foot of depth may be used.
7.3. Corrosivity
A representative sample of the on-site soils was tested to evaluate corrosion potential. The test results are presented in Appendix C. The project design engineer can use the sulfate results in conjunction with ACI 318 to specify the water/cement ratio, compressive strength, and cementitious material types for concrete exposed to soil. A corrosion engineer should be contacted to provide specific corrosion control recommendations.
7.4. Additional Borings for Site 8382
As is previously noted, NOVA recommends re-mobilization of a subsurface exploration to better characterize the subsurface along this alignment.
10/27/2026 C3 259 of 424
DRAFT Report of a Geotechnical Investigation
Sewer Capacity Improvements, Vista, CA
NOVA Project No. 3024048
February 12, 2025
21 8. CLOSURE
NOVA should review project plans and specifications prior to bidding and construction to check that the intent of the recommendations in this report has been incorporated. Observations and tests should be performed during construction. If the conditions encountered during construction differ from those anticipated based on the subsurface exploration program, the presence of personnel from NOVA during construction will enable an evaluation of the exposed conditions and modifications of the recommendations in this report or development of additional recommendations in a timely manner.
NOVA should be advised of changes in the project scope so that the recommendations contained in this report can be evaluated with respect to the revised plans. Changes in recommendations will be verified in writing. The findings in this report are valid as of the date of this report. Changes in the condition of the site can, however, occur with the passage of time, whether they are due to natural processes or work on this or adjacent areas. In addition, changes in the standards of practice and government regulations can occur. Thus, the findings in this report may be invalidated wholly or in part by changes beyond NOVA’s control. This report should not be relied upon after a period of two years without a review by NOVA verifying the suitability of the conclusions and recommendations to site conditions at that time.
In the performance of professional services, NOVA exercises the level of care and skill ordinarily exercised by members of the geotechnical profession currently practicing under similar conditions and in the same locality. The client recognizes that subsurface conditions may vary from those encountered at the boring locations and that the data, interpretations, and recommendations reported herein are based solely on the information obtained by NOVA. NOVA will be responsible for those data, interpretations, and recommendations, but shall not be responsible for interpretations by others of the information developed. Our services consist of professional consultation and observation only, and no warranty whatsoever, express or implied, is made or intended in connection with the work performed or to be performed by us, or by our proposal for consulting or other services, or by our furnishing of oral or written reports or findings.
10/27/2026 C3 260 of 424
DRAFT Report of a Geotechnical Investigation
Sewer Capacity Improvements, Vista, CA
NOVA Project No. 3024048
February 12, 2025
22 9. REFERENCES
American Concrete Institute, 2014, Building Code Requirements for Structural Concrete (ACI 318-14) and Commentary, dated September.
California Department of Conservation – Landslide Inventory and Deep Landslide Susceptibility Map, https://maps.conservation.ca.gov/cgs/lsi/app/ , accessed January 2025.
California Department of Transportation (Caltrans), 2018, Standard Specifications.
California Department of Water Resources – Water Data Library(WDL) Station Map, https://wdl.water.ca.gov/waterdatalibrary/Map.aspx , accessed January 2025.
California Geological Survey (CGS), 2002, California Geomorphic Provinces Note 36, Electronic Copy, Revised December 2002.
______, 2008, Guidelines for Evaluating and Mitigating Seismic Hazards in California, Special Publication 117A, dated September.
______, 2022, Tsunami Hazard Area Map, County of San Diego, dated October 7. ______, 2022b, Fault Activity Map of California, https://maps.conservation.ca.gov/cgs/fam/ , accessed January 2025.
County of San Diego Guidelines for Determining Significance – Geologic Hazards, Department of Planning and Land Use, Department of Public works, July 30, 2007. https://www.sandiegocounty.gov/dplu/docs/Geologic_Hazards_Guidelines.pdf , accessed January 2025.
Federal Emergency Management Agency, 2012, FIRM Flood Insurance Rate Map, San Diego County, Firm Panel 06073C0766G, https://msc.fema.gov/portal/search , effective 5/16/2012; accessed January 2025.
______, 2012a, FIRM Flood Insurance Rate Map, Santa Barbara County, Firm Panel 06073C0767G, https://msc.fema.gov/portal/search , effective 5/16/2012; accessed January 2025. ______, 2012b, FIRM Flood Insurance Rate Map, Santa Barbara County, Firm Panel 06073C0778G, https://msc.fema.gov/portal/search , effective 5/16/2012; accessed January 2025.
Google Earth® Pro, 2025, Version 7.3.6.10201.
Historic Aerials Website, https://www.historicaerials.com/viewer , accessed January 2025.
International Code Council, 2021, 2022 California Building Code, California Code of Regulations, Title 24, Part 2, Volume 2 of 2, Based on the 2021 International Building Code, Effective 1/1/23.
Kennedy, M.P, and Tan, S.S., Bovard, K.R., Alvarez, R.M., Watson, M.J., and Gutierrez 2007, Geologlic Map of the Oceanside 30’x60’ Quadrangle and Adjacent Areas, California, California Geological Survery, RGM-2.
10/27/2026 C3 261 of 424
DRAFT Report of a Geotechnical Investigation
Sewer Capacity Improvements, Vista, CA
NOVA Project No. 3024048
February 12, 2025
23 Public Works Standards, Inc., 2021, “Greenbook” Standard Specifications for Public Works Construction, 2021 Edition.
United States Geological Survey (USGS), 2022, USGS Geologic Hazards Science Center, U.S.
Quaternary Faults, accessed January 2025.
______, 2024, Areas of Land Subsidence in California,
https://ca.water.usgs.gov/land_subsidence/california-subsidence-areas.html , accessed January 2025.
______, 2022, The National Map US Topo, San Luis Rey Quadrangle, California –San Diego County 7.5 Minute Series, https://ngmdb.usgs.gov/topoview/ , accessed January 2025. ______, 2022a, The National Map US Topo, San Marcos Quadrangle, California –San Diego County 7.5 Minute Series, https://ngmdb.usgs.gov/topoview/ , accessed January 2025.
10/27/2026 C3 262 of 424
DRAFT Report of a Geotechnical Investigation
Sewer Capacity Improvements, Vista, CA
NOVA Project No. 3024048
February 12, 2025
PLATES
10/27/2026 C3 263 of 424
KEY TO SYMBOLS
HOLLOW STEM AUGER
GEOTECHNICAL BORING
Qa
Tsa
Qa
Tsa
af
Qa
Tsa
af
ALLUVIAL FLOOD-PLAIN
DEPOSITS
SANTIAGO FORMATION
af
B-5
FILL
DVBE
www.usa-nova.com
PROJECT NO.:
DRAWN BY:
REVIEWED BY:
3024048
SB
PK
GEOTECHNICAL MAP -
VIA CENTRE
DRAWING TITLE:
SCALE:1"=100'
PLATE NO.1 OF 3
SBE SDVOSB SLBE
16610 Aston Street
Irvine, CA 92606
P: 949.388.7710
GEOTECHNICAL
MATERIALS
SPECIAL INSPECTION
NOVA
4373 Viewridge Avenue, Suite B
San Diego, CA 92123
P: 858.292.7575A
A'
B-1
B-2
B-3
B-2a
B-2b
200'0 100'
CI
P
8 3
8 1
-
V
I
A
C
E
N
T
R
E
A
T
H
A
C
I
E
N
D
A
D
R
I
V
E
AN
D
V
I
S
T
A
W
A
Y
CI
P
8 3
8 2
-
S
O
U
T
H
S
A
N
T
A
F
E
A
V
E
N
U
E
A
N
D
CI
V
I
C
C
E
N
T
R
E
D
R
I
V
E
VI
S
T
A
,
C
A
SE
W
E
R
C
A
P
A
C
I
T
Y
I
M
P
R
O
V
E
M
E
N
T
S
CIP 8381 - VIA CENTRE AT HACIENDA DRIVE
AND VISTA WAY
*NOTE: LOCATIONS APPROXIMATE
*BASE MAP:
GOOGLE EARTH, 2025
NW E
N
S
10/27/2026 C3 264 of 424
KEY TO SYMBOLS
HOLLOW STEM AUGER
GEOTECHNICAL BORING
Qa
Tsa
ALLUVIAL FLOOD-PLAIN
DEPOSITS
SANTIAGO FORMATION
af
B-5
B-4
B-5
B-4a
B-5a
FILL
DVBE
www.usa-nova.com
PROJECT NO.:
DRAWN BY:
REVIEWED BY:
3024048
SB
PK
GEOTECHNICAL MAP -
SANTA FE AVENUE
DRAWING TITLE:
SCALE:1"=100'
PLATE NO.2 OF 3
SBE SDVOSB SLBE
16610 Aston Street
Irvine, CA 92606
P: 949.388.7710
GEOTECHNICAL
MATERIALS
SPECIAL INSPECTION
NOVA
4373 Viewridge Avenue, Suite B
San Diego, CA 92123
P: 858.292.7575
200'0 100'
CI
P
8 3
8 1
-
V
I
A
C
E
N
T
R
E
A
T
H
A
C
I
E
N
D
A
D
R
I
V
E
AN
D
V
I
S
T
A
W
A
Y
CI
P
8 3
8 2
-
S
O
U
T
H
S
A
N
T
A
F
E
A
V
E
N
U
E
A
N
D
CI
V
I
C
C
E
N
T
R
E
D
R
I
V
E
CIP 8382 - SOUTH SANTA FE AVENUE AND
CIVIC CENTRE DRIVE
VI
S
T
A
,
C
A
SE
W
E
R
C
A
P
A
C
I
T
Y
I
M
P
R
O
V
E
M
E
N
T
S
*NOTE: LOCATIONS APPROXIMATE
*BASE MAP:
GOOGLE EARTH, 2025
NW E
N
S
Kt
af
10/27/2026 C3 265 of 424
4373 Viewridge Avenue, Suite B
San Diego, CA 92123
P: 858.292.7575
16610 Aston Street
Irvine, CA 92606
P: 949.388.7710
GEOTECHNICAL
MATERIALS
SPECIAL INSPECTION
DVBE
www.usa-nova.com
GEOLOGIC
CROSS-SECTION AA'
PLATE NO.3 OF 3
SBE SDVOSB SLBE
PROJECT NO.:
DRAWN BY:
REVIEWED BY:
3024048
SB
PK
DRAWING TITLE:
SCALE:HORIZONTAL:
VERTICAL:
1"=100'
1"=50'
NOVA
250
300
A
200El
e
v
a
t
i
o
n
,
f
e
e
t
(
M
S
L
)
150
100
250
300
200
150
700
A'
El
e
v
a
t
i
o
n
,
f
e
e
t
(
M
S
L
)
0 100 200 300 400 500 600
ELEVATIONS WERE OBTAINED FROM GOOGLE EARTH
HORIZONTAL SCALE
VERTICAL SCALE
B-2
?
KEY TO SYMBOLS
af
afaf
FILL
GEOTECHNICAL BORING
Qa
Qa
Qa
Tsa
TsaTsa
ALLUVIAL FLOOD-PLAIN
DEPOSITS
SANTIAGO FORMATION
GEOLOGIC CONTACT,
QUERIED WHERE UNCERTAIN
PROPOSED SEWER CAPACITY
IMPROVEMENT ZONE
*NOTE: LOCATIONS APPROXIMATE
200'
100'
0 0
100'
50'
CI
P
8 3
8 1
-
V
I
A
C
E
N
T
R
E
A
T
H
A
C
I
E
N
D
A
D
R
I
V
E
AN
D
V
I
S
T
A
W
A
Y
CI
P
8 3
8 2
-
S
O
U
T
H
S
A
N
T
A
F
E
A
V
E
N
U
E
A
N
D
CI
V
I
C
C
E
N
T
R
E
D
R
I
V
E
VI
S
T
A
,
C
A
SE
W
E
R
C
A
P
A
C
I
T
Y
I
M
P
R
O
V
E
M
E
N
T
S
TD=26.5'
B-1 B-2
TD=9'
B-3
TD=31'
????
????
?
?
?
?
?
?
????
???
??
?
EXISTING
FREEWAY
10/27/2026 C3 266 of 424
DRAFT Report of a Geotechnical Investigation
Sewer Capacity Improvements, Vista, CA
NOVA Project No. 3024048
February 12, 2025
APPENDIX A
USE OF THE GEOTECHNICAL REPORT
10/27/2026 C3 267 of 424
10/27/2026 C3 268 of 424
10/27/2026 C3 269 of 424
DRAFT Report of a Geotechnical Investigation
Sewer Capacity Improvements, Vista, CA
NOVA Project No. 3024048
February 12, 2025
APPENDIX B
BORING LOGS
10/27/2026 C3 270 of 424
SUBSURFACE EXPLORATION LEGEND
NOVA
GEOTECHNICAL
MATERIALS
SPECIAL INSPECTION
SBEDVBE SDVOSB
4373 Viewridge Ave., Suite B
San Diego, CA 92123
P: 858.292.7575
www.usa-nova.com
16610 Ashton Street
Irvine, CA 92606
P: 949.388.7710
MAJOR DIVISIONS TYPICAL NAMES
GRAVEL
MORE THAN HALF
COARSE FRACTION
IS LARGER THAN
NO. 4 SIEVE GRAVEL WITH
15% OR MORE
FINES
CLEAN GRAVEL
WITH LESS THAN
15% FINES
CLEAN SAND
SAND
MORE THAN HALF
COARSE FRACTION
IS FINER THAN NO.
4 SIEVE SIZE
SAND WITH 15%
OR MORE FINES
WITH LESS THAN
15% FINES
SILTS AND CLAYS
LIQUID LIMIT 50% OR LESS
SILTS AND CLAYS
LIQUID LIMIT GREATER THAN 50%
HIGHLY ORGANIC SOILS
GW
GP
GM
GC
SW
SP
SM
SC
ML
CL
OL
MH
CH
OH
PT
WELL-GRADED GRAVEL WITH OR WITHOUT
SAND
POORLY GRADED GRAVEL WITH OR
WITHOUT SAND
SILTY GRAVEL WITH OR WITHOUT SAND
CLAYEY GRAVEL WITH OR WITHOUT SAND
WELL-GRADED SAND WITH OR WITHOUT
GRAVEL
POORLY GRADED SAND WITH OR WITHOUT
GRAVEL
SILTY SAND WITH OR WITHOUT GRAVEL
CLAYEY SAND WITH OR WITHOUT GRAVEL
SILT WITH OR WITHOUT SAND OR
GRAVEL
ELASTIC SILT WITH OR WITHOUT SAND
OR GRAVEL
FAT CLAY WITH OR WITHOUT SAND OR
GRAVEL
ORGANIC SILT OR CLAY OF HIGH
PLASTICITY WITH OR WITHOUT SAND OR
GRAVEL
PEAT AND OTHER HIGHLY ORGANIC SOILS
FI
N
E
-
G
R
A
I
N
E
D
S
O
I
L
S
CO
A
R
S
E
-
G
R
A
I
N
E
D
S
O
I
L
S
M
O
R
E
T
H
A
N
H
A
L
F
I
S
F
I
N
E
R
T
H
A
N
N
O
.
2 0
0 S
I
E
V
E
M
O
R
E
T
H
A
N
H
A
L
F
I
S
C
O
A
R
S
E
R
T
H
A
N
N
O
.
2 0
0 S
I
E
V
E
RELATIVE DENSITY OF
COHESIONLESS SOILS
RELATIVE DENSITY
VERY LOOSE
LOOSE
MEDIUM DENSE
DENSE
VERY DENSE
SPT N60
BLOWS/FOOT
0 - 4
4 - 10
10 - 30
30 - 50
OVER 50
CONSISTENCY OF COHESIVE SOILS
CONSISTENCY
VERY SOFT
SOFT
MEDIUM STIFF
STIFF
VERY STIFF
HARD
0 - 2
2 - 4
4 - 8
8 - 15
15 - 30
OVER 30
NUMBER OF BLOWS OF 140 LB HAMMER FALLING 30 INCHES TO DRIVE A 2 INCH O.D. (1-3/8 INCH I.D.) SPLIT-BARREL SAMPLER THE LAST 12 INCHES OF AN 18-INCH DRIVE (ASTM-1586 STANDARD PENETRATION TEST).
IF THE SEATING INTERVAL (1st 6 INCH INTERVAL) IS NOT ACHEIVED, N IS REPORTED AS REF.
0 - 0.25
0.25 - 0.50
0.50 - 1.0
1.0 - 2.0
2.0 - 4.0
OVER 4.0
LEAN CLAY WITH OR WITHOUT SAND
OR GRAVEL
ORGANIC SILT OR CLAY OF LOW TO
MEDIUM PLASTICITY WITH OR
WITHOUT SAND OR GRAVEL
SLBE
SPT N60
BLOWS/FOOT
POCKET PENETROMETER
MEASUREMENT (TSF)
BULK SAMPLE
SPT SAMPLE ( ASTM D1586)
MOD. CAL. SAMPLE (ASTM D3550)
UNRELIABLE BLOW COUNTS
GEOLOGIC CONTACT
SOIL TYPE CHANGE
GROUNDWATER / STABILIZED
GROUNDWATER SEEPAGE CORROSIVITY
DIRECT SHEAR
EXPANSION INDEX
MAXIMUM DENSITY
ATTERBERG LIMITS
CONSOLIDATIONCN
CR
DS
EI
MD
LAB TEST ABBREVIATIONS
AL
RESISTANCE VALUERV
SIEVE ANALYSISSA
SAND EQUIVALENTSE
REFUSALREF
LOG ABBREVIATIONS*
10/27/2026 C3 271 of 424
NOVA
LOG OF BORING B-1
FIGURE: B.1PROJECT: 3024048DRAFTED BY: SB
DE
P
T
H
(
F
T
)
N60
BL
O
W
S
P
E
R
6 I
N
N
5 10
15 20
25 30
0 BU
L
K
S
A
M
P
L
E
SUMMARY OF SUBSURFACE CONDITIONS
(USCS; COLOR, MOISTURE, DENSITY, GRAIN SIZE, OTHER)
LA
B
T
E
S
T
S
CA
L
/
S
P
T
S
A
M
P
L
E
SOIL DESCRIPTION
M
O
I
S
T
U
R
E
(%
)
SO
I
L
C
L
A
S
S
.
(U
S
C
S
)
DR
Y
D
E
N
S
I
T
Y
(p
c
f
)
4373 Viewridge Avenue, Suite B
San Diego, CA 92123
P: 858.292.7575
GEOTECHNICAL
MATERIALS
SPECIAL INSPECTION
www.usa-nova.com
SBEDVBE SDVOSB SLBE
BORING TERMINATED AT 26 ½ FT. NO GROUNDWATER WAS ENCOUNTERED. BACKFILLED WITH CUTTINGS AND PATCHED WITH AQUAPHALT.
4" A.C, 5" BASE
FILL (af): CLAY SAND/SILTY SAND, BROWN TO DARK BROWN, SLIGHTLY MOIST TO MOIST, FINE TO COARSE GRAINED SAND, TRACE FINE GRAVEL, TRACE CLAY.
CLAYEY SAND/SANDY CLAY, BROWN TO GRAYISH BROWN, SLIGHTLY MOIST TO MOIST, LOOSE/MEDIUM STIFF, FINE TO COARSE GRAINED SAND.
CLAY, BROWN MOTTLED WITH GRAY, MOIST, MEDIUM STIFF, TRACE MEDIUM TO COARSE GRAINED SAND, TRACE FINE GRAVEL.
ALLUVIAL FLOOD PLAIN DEPOSITS (Qa): CLAYEY SAND, GRAY, MOIST, MEDIUM DENSE, MEDIUM TO COARSE GRAINED SAND.
BEDROCK - SANTIAGO FORMATION(Tsa): CLAYEY SILTSTONE, GRAY TO BLUEISH GRAY,
SLIGHTLY MOIST, VERY STIFF, TRACE FAINT ORANGE OXIDATION STAINING, SLOWER DRILLING.
GREENDISH GRAY, REDUCED CLAY, NO ORANGE STAININGTRACE BLACK MnO SPECS.
TRACE MEDIUM SAND.
SC/SM
1 DRILLING EQUPMENT:
ELEVATION (FT):
GROUNDWATER DEPTH (FT):
DRILLING METHOD:
DATE DRILLED:SAMPLE METHOD:
NOTES:REVIEWED BY:ETR~79.6%, N60 ~ 79.6
60 *N~1.33*N
LOGGED BY:
10/16/24
± 229 Google Earth
N/A
CME 95 HAMMER: 140 LBS., DROP: 30 IN (AUTO)
HOLLOW STEM AUGER SB
PK
2 2
4 5
10 13
8 4
15 20
8 20
25 41
SC/CL
CL19.75
21 32
53 81
13.9 SC
SEWER CAPACITY IMPROVEMENTS
CIP 8381 VIA CENTRE DR, CIP 8382 SOUTH SANTA FE AVE
VISTA, CALIFORNIA
16610 Ashton Street
Irvine, CA 92606
P: 949.388.7710
21.2 19.6
17 10/27/2026 C3 272 of 424
NOVA
LOG OF BORING B-2
FIGURE: B.2DRAFTED BY: SB PROJECT: 3024048
ETR~79.6%, N60 ~ 79.6
60 *N~1.33*N
10/16/24
± 229 Google Earth
CME 95
SEWER CAPACITY IMPROVEMENTS
CIP 8381 VIA CENTRE DR, CIP 8382 SOUTH SANTA FE AVE
VISTA, CALIFORNIA
DE
P
T
H
(
F
T
)
N60
BL
O
W
S
P
E
R
6 I
N
N
5 10
15 20
25 30
0 BU
L
K
S
A
M
P
L
E
SUMMARY OF SUBSURFACE CONDITIONS
(USCS; COLOR, MOISTURE, DENSITY, GRAIN SIZE, OTHER)
LA
B
T
E
S
T
S
CA
L
/
S
P
T
S
A
M
P
L
E
SOIL DESCRIPTION
M
O
I
S
T
U
R
E
(%
)
SO
I
L
C
L
A
S
S
.
(U
S
C
S
)
DR
Y
D
E
N
S
I
T
Y
(p
c
f
)
4373 Viewridge Avenue, Suite B
San Diego, CA 92123
P: 858.292.7575
GEOTECHNICAL
MATERIALS
SPECIAL INSPECTION
www.usa-nova.com
SBEDVBE SDVOSB SLBE
BORING TERMINATED AT 9 FT DUE TO REFUSAL. 2 NEW BORINGS WERE EXCAVATED 5 FT
FROM ORIGINAL BORING IN DIFFERENT DIRECTIONS AND ENCOUNTERED REFUSAL AT DEPTHS OF APPROX. 9FT AND 10FT. GROUNDWATER WAS NOT ENCOUNTERED.
BACKFILLED WITH CUTTINGS AND PATCHED WITH AQUAPHALT.
6" A.C., 8" BASE
FILL (af): CLAYEY SAND BROWN TO GRAYISH BROWN, SLIGHTLY MOIST TO MOIST, FINE TO COARSE SAND, TRACE SILT.
BROWN MOTTLED WITH GRAYISH BROWN, MOIST, MEDIUM DENSE.
SC
3 DRILLING EQUPMENT:
ELEVATION (FT):
GROUNDWATER DEPTH (FT):
DRILLING METHOD:
DATE DRILLED:SAMPLE METHOD:
NOTES:REVIEWED BY:
LOGGED BY:
21.2 HAMMER: 140 LBS., DROP: 30 IN (AUTO)
HOLLOW STEM AUGER SB
PK
4 5
16610 Ashton Street
Irvine, CA 92606
P: 949.388.7710
14.312
10/27/2026 C3 273 of 424
NOVA
LOG OF BORING B-3
FIGURE: B.3DRAFTED BY: SB PROJECT: 3024048
ETR~79.6%, N60 ~ 79.6
60 *N~1.33*N
10/16/24
± 229 Google Earth
CME 95
SEWER CAPACITY IMPROVEMENTS
CIP 8381 VIA CENTRE DR, CIP 8382 SOUTH SANTA FE AVE
VISTA, CALIFORNIA
DE
P
T
H
(
F
T
)
N60
BL
O
W
S
P
E
R
6 I
N
N
5 10
15 20
25 30
0 BU
L
K
S
A
M
P
L
E
SUMMARY OF SUBSURFACE CONDITIONS
(USCS; COLOR, MOISTURE, DENSITY, GRAIN SIZE, OTHER)
LA
B
T
E
S
T
S
CA
L
/
S
P
T
S
A
M
P
L
E
SOIL DESCRIPTION
M
O
I
S
T
U
R
E
(%
)
SO
I
L
C
L
A
S
S
.
(U
S
C
S
)
DR
Y
D
E
N
S
I
T
Y
(p
c
f
)
4373 Viewridge Avenue, Suite B
San Diego, CA 92123
P: 858.292.7575
GEOTECHNICAL
MATERIALS
SPECIAL INSPECTION
www.usa-nova.com
SBEDVBE SDVOSB SLBE
4"A.C., 5" BASE
FILL (af): SILTY SAND, BROWN, SLIGHTLY MOIST, FINE TO COARSE GRAINED SAND, TRACE FINE GRAVEL.
@3', VERY MOIST.
CLAY, BROWN TO DARK BROWN, MOIST TO VERY MOIST, MEDIUM DENSE, TRACE MEDIUM TO COARSE GRAINED SAND.
ALLUVIAL FLOOD PLAIN DEPOSITS (Qa):SANDY CLAY, GRAY, SLIGHTLY MOIST, VERY STIFF, ORANGE OXIDATION STAINING, FINE TO MEDIUM GRAINED SAND.
SANDY FAT CLAY, GRAY, MOIST TO VERY MOIST, VERY STIFF, TRACE OXIDATION STAINING.
CLAYEY SAND, GRAY TO GRAYISH BROWN, MOIST, MEDIUM DENSE, FINE TO MEDIUM GRAINED SAND, TRACE ORANGE OXIDATION STAINING, TRACE MEDIUM GRAINED SAND.
SILTY SAND, BROWN, MOIST TO VERY MOIST, MEDIUM DENSE, FINE TO MEDIUM GRAINED SAND, SOME COARSE GRAINED SAND.
BEDROCK - SANTIAGO FORMATION(Tsa):SILTSTONE/CLAYSTONE, BLUISH GRAY, DAMP, HARD, TRACE ORANGE OXIDATION STAINING.
SM
DRILLING EQUPMENT:
ELEVATION (FT):
GROUNDWATER DEPTH (FT):
DRILLING METHOD:
DATE DRILLED:SAMPLE METHOD:
NOTES:REVIEWED BY:
LOGGED BY:
N/A
HAMMER: 140 LBS., DROP: 30 IN (AUTO)
HOLLOW STEM AUGER SB
PK
4 7
10 5
4 4
9 8
5 4
28 8
7 5
40 CL
12.723
21 16
12 90
15.6 24.5
19.1 20.5
CL
CH
SC
SM
16610 Ashton Street
Irvine, CA 92606
P: 949.388.7710
10/27/2026 C3 274 of 424
NOVA
LOG OF BORING B-3(CONT.)
FIGURE: B.4DRAFTED BY: SB PROJECT: 3024048
ETR~79.6%, N60 ~ 79.6
60 *N~1.33*N
10/16/24
± 229 Google Earth
CME 95
SEWER CAPACITY IMPROVEMENTS
CIP 8381 VIA CENTRE DR, CIP 8382 SOUTH SANTA FE AVE
VISTA, CALIFORNIA
DE
P
T
H
(
F
T
)
N60
BL
O
W
S
P
E
R
6 I
N
N
35 40
45 50
55 60
30 BU
L
K
S
A
M
P
L
E
SUMMARY OF SUBSURFACE CONDITIONS
(USCS; COLOR, MOISTURE, DENSITY, GRAIN SIZE, OTHER)
LA
B
T
E
S
T
S
CA
L
/
S
P
T
S
A
M
P
L
E
SOIL DESCRIPTION
M
O
I
S
T
U
R
E
(%
)
SO
I
L
C
L
A
S
S
.
(U
S
C
S
)
DR
Y
D
E
N
S
I
T
Y
(p
c
f
)
4373 Viewridge Avenue, Suite B
San Diego, CA 92123
P: 858.292.7575
GEOTECHNICAL
MATERIALS
SPECIAL INSPECTION
www.usa-nova.com
SBEDVBE SDVOSB SLBE
BORING TERMINATED AT 31 FT. NO GROUNDWATER WAS ENCOUNTERED. BACKFILLED WITH CUTTINGS AND PATCHED WITH AQUAPHALT.
SAA
DRILLING EQUPMENT:
ELEVATION (FT):
GROUNDWATER DEPTH (FT):
DRILLING METHOD:
DATE DRILLED:SAMPLE METHOD:
NOTES:REVIEWED BY:
LOGGED BY:
N/A
HAMMER: 140 LBS., DROP: 30 IN (AUTO)
HOLLOW STEM AUGER SB
PK
24 50/6"
16610 Ashton Street
Irvine, CA 92606
P: 949.388.7710
22.3 10/27/2026 C3 275 of 424
NOVA
LOG OF BORING B-4
FIGURE: B.5DRAFTED BY: SB PROJECT: 3024048
ETR~79.6%, N60 ~ 79.6
60 *N~1.33*N
10/16/24
± 229 Google Earth
CME 95
SEWER CAPACITY IMPROVEMENTS
CIP 8381 VIA CENTRE DR, CIP 8382 SOUTH SANTA FE AVE
VISTA, CALIFORNIA
DE
P
T
H
(
F
T
)
N60
BL
O
W
S
P
E
R
6 I
N
N
5 10
15 20
25 30
0 BU
L
K
S
A
M
P
L
E
SUMMARY OF SUBSURFACE CONDITIONS
(USCS; COLOR, MOISTURE, DENSITY, GRAIN SIZE, OTHER)
LA
B
T
E
S
T
S
CA
L
/
S
P
T
S
A
M
P
L
E
SOIL DESCRIPTION
M
O
I
S
T
U
R
E
(%
)
SO
I
L
C
L
A
S
S
.
(U
S
C
S
)
DR
Y
D
E
N
S
I
T
Y
(p
c
f
)
4373 Viewridge Avenue, Suite B
San Diego, CA 92123
P: 858.292.7575
GEOTECHNICAL
MATERIALS
SPECIAL INSPECTION
www.usa-nova.com
SBEDVBE SDVOSB SLBE
BORING TERMINATED AT 4 FT DUE TO REFUSAL. NEW BORING WAS PLACED 5FT AWAY AND REFUSAL WAS HIT AT SAME DEPTH. CONCRETE MATERIAL ENCOUNTERED IN BOTH BORINGS AT 4FT THAT COULD BE POSSIBLE UTILITY LINE ENCASEMENT. NO GROUNDWATER WAS ENCOUNTERED. BACKFILLED WITH CUTTINGS AND PATCHED WITH AQUAPHALT. 9"A.C., 4" BASE
FILL (af): CLAYEY SAND, DARK BROWN, MOIST, TRACE MEDIUM TO COARSE GRAINED SAND.SC DRILLING EQUPMENT:
ELEVATION (FT):
GROUNDWATER DEPTH (FT):
DRILLING METHOD:
DATE DRILLED:SAMPLE METHOD:
NOTES:REVIEWED BY:
LOGGED BY:
N/A
HAMMER: 140 LBS., DROP: 30 IN (AUTO)
HOLLOW STEM AUGER SB
PK
16610 Ashton Street
Irvine, CA 92606
P: 949.388.7710
10/27/2026 C3 276 of 424
NOVA
LOG OF BORING B-5
FIGURE: B.6DRAFTED BY: SB PROJECT: 3024048
ETR~79.6%, N60 ~ 79.6
60 *N~1.33*N
10/16/24
± 229 Google Earth
CME 95
SEWER CAPACITY IMPROVEMENTS
CIP 8381 VIA CENTRE DR, CIP 8382 SOUTH SANTA FE AVE
VISTA, CALIFORNIA
DE
P
T
H
(
F
T
)
N60
BL
O
W
S
P
E
R
6 I
N
N
5 10
15 20
25 30
0 BU
L
K
S
A
M
P
L
E
SUMMARY OF SUBSURFACE CONDITIONS
(USCS; COLOR, MOISTURE, DENSITY, GRAIN SIZE, OTHER)
LA
B
T
E
S
T
S
CA
L
/
S
P
T
S
A
M
P
L
E
SOIL DESCRIPTION
M
O
I
S
T
U
R
E
(%
)
SO
I
L
C
L
A
S
S
.
(U
S
C
S
)
DR
Y
D
E
N
S
I
T
Y
(p
c
f
)
4373 Viewridge Avenue, Suite B
San Diego, CA 92123
P: 858.292.7575
GEOTECHNICAL
MATERIALS
SPECIAL INSPECTION
www.usa-nova.com
SBEDVBE SDVOSB SLBE
BORING TERMINATED AT 5'9" FT DUE TO REFUSAL. NEW BORING WAS PLACED 5FT AWAY AND REFUSAL WAS HIT AT 4'11". CONCRETE MATERIAL ENCOUNTERED IN BOTH BORINGS AT REFUSAL DEPTHS THAT COULD BE POSSIBLE UTILITY LINE ENCASEMENT. NO GROUNDWATER WAS ENCOUNTERED. BACKFILLED WITH CUTTINGS AND PATCHED WITH AQUAPHALT.
10"A.C., 4" BASE
FILL (af): CLAYEY SAND, DARK BROWN TO BROWN, SLIGHTLY MOIST, FINE TO COARSE GRAINED SAND.
SC
DRILLING EQUPMENT:
ELEVATION (FT):
GROUNDWATER DEPTH (FT):
DRILLING METHOD:
DATE DRILLED:SAMPLE METHOD:
NOTES:REVIEWED BY:
LOGGED BY:
N/A
HAMMER: 140 LBS., DROP: 30 IN (AUTO)
HOLLOW STEM AUGER SB
PK
16610 Ashton Street
Irvine, CA 92606
P: 949.388.7710
10/27/2026 C3 277 of 424
DRAFT Report of a Geotechnical Investigation
Sewer Capacity Improvements, Vista, CA
NOVA Project No. 3024048
February 12, 2025
APPENDIX C
LABORATORY TESTING
10/27/2026 C3 278 of 424
Laboratory tests were performed in accordance with the generally accepted American Society for Testing and Materials (ASTM) test methods or suggested procedures. Brief descriptions of the tests performed are presented below:
LAB TEST SUMMARY
● CLASSIFICATION: Field classifications were verified in the laboratory by visual examination. The final soil classifications are in accordance with the Unified Soil Classification System and are presented on the exploration logs in Appendix B. ● MOISTURE CONTENT (ASTM D2216): A test was performed on a selected representative soil sample to evaluate the water (moisture) content by mass of soil, rock and similar materials where the reduction in mass by drying is due to loss of water. The test sample is dried in an oven at a temperature of 110º + 5ºC to a constant mass. The loss of mass due to drying is considered to be water. The water (moisture) content was determined in general accordance with ASTM D 2216. ● GRADATION ANALYSIS (ASTM D6913): Gradation analyses were performed on representative soil samples in general accordance with ASTM D422. The grain size distributions of the samples were determined in general accordance with ASTM D6913. ● ATTERBERG LIMITS (ASTM D4318): Tests were performed on selected representative fine-grained soil samples to evaluate the liquid limits, plastic limits, and plasticity indexes in general accordance with ASTM D4318. These test results were utilized to evaluate the soil classification in accordance with the Unified Soil Classification System.
● R-VALUE (CT 301 AND ASTM D2844): The resistance value, or R-Value, for near-surface site soil was evaluated in general accordance with California Test (CT) 301 and ASTM D2844. A sample was prepared and evaluated for exudation pressure and expansion pressure. The equilibrium R-Value is reported as the lesser or more conservative of the two calculated results.
● CORROSIVITY (CAL. TEST METHOD 417, 422, 643): Soil PH, and minimum resistivity tests were performed on a representative soil sample in general accordance with test method CT 643. The sulfate and chloride content of the selected sample were evaluated in general accordance with CT 417 and CT 422, respectively.
of 90 days from the date of this report.
Soil samples not tested are now stored in our laboratory for future reference and evaluation, if needed. Unless notified to the contrary, samples will be disposed 4373 Viewridge Avenue, Suite B
San Diego, CA 92123
P: 858.292.7575
16610 Aston Street
Irvine, CA 92606
P: 949.388.7710
NOVA
GEOTECHNICAL
MATERIALS
SPECIAL INSPECTION
www.usa-nova.com
SBEDVBE SDVOSB SLBE
FIGURE: C.1REVIEWED BY: PKDRAFTED BY: JS PROJECT: 3024048
SEWER CAPACITY IMPROVEMENTS
VISTA, CALIFORNIA
CIP 8381 VIA CENTRE DR, CIP 8382 SOUTH SANTA FE AVE
10/27/2026 C3 279 of 424
CLASSIFICATION TEST RESULTS
Gravel Sand
Coarse FineMediumCoarseFine
Silt or Clay
NOVA
GEOTECHNICAL
MATERIALS
SPECIAL INSPECTION
4373 Viewridge Avenue, Suite B
San Diego, CA 92123
P: 858.292.7575
www.usa-nova.com
16610 Aston Street
Irvine, CA 92606
P: 949.388.7710
SBEDVBE SDVOSB SLBE
Sample Location:
Depth (ft):
USCS Soil Type:
Passing No. 200 (%):
B-1 Atterberg Limits (ASTM D4318):
SC
33 10 - 11½Liquid Limit, LL:
Plastic Limit, PL:
Plasticity Index, PI:
32 17
15 FIGURE: C.2REVIEWED BY: PKDRAFTED BY: JS PROJECT: 3024048
SEWER CAPACITY IMPROVEMENTS
VISTA, CALIFORNIA
CIP 8381 VIA CENTRE DR, CIP 8382 SOUTH SANTA FE AVE
10/27/2026 C3 280 of 424
CLASSIFICATION TEST RESULTS
Gravel Sand
Coarse FineMediumCoarseFine
Silt or Clay
NOVA
GEOTECHNICAL
MATERIALS
SPECIAL INSPECTION
4373 Viewridge Avenue, Suite B
San Diego, CA 92123
P: 858.292.7575
www.usa-nova.com
16610 Aston Street
Irvine, CA 92606
P: 949.388.7710
SBEDVBE SDVOSB SLBE
Sample Location:
Depth (ft):
USCS Soil Type:
Passing No. 200 (%):
B-1 Atterberg Limits (ASTM D4318):
CL
60 25 - 26½ Liquid Limit, LL:
Plastic Limit, PL:
Plasticity Index, PI:
N/A
N/A
N/A
FIGURE: C.3REVIEWED BY: PKDRAFTED BY: JS PROJECT: 2023161
SEWER CAPACITY IMPROVEMENTS
VISTA, CALIFORNIA
CIP 8381 VIA CENTRE DR, CIP 8382 SOUTH SANTA FE AVE
10/27/2026 C3 281 of 424
CLASSIFICATION TEST RESULTS
Gravel Sand
Coarse FineMediumCoarseFine
Silt or Clay
NOVA
GEOTECHNICAL
MATERIALS
SPECIAL INSPECTION
4373 Viewridge Avenue, Suite B
San Diego, CA 92123
P: 858.292.7575
www.usa-nova.com
16610 Aston Street
Irvine, CA 92606
P: 949.388.7710
SBEDVBE SDVOSB SLBE
Sample Location:
Depth (ft):
USCS Soil Type:
Passing No. 200 (%):
B-2 Atterberg Limits (ASTM D4318):
SC
39 5 - 6½ Liquid Limit, LL:
Plastic Limit, PL:
Plasticity Index, PI:
29 18
11 FIGURE: C.4REVIEWED BY: PKDRAFTED BY: JS PROJECT: 3024048
SEWER CAPACITY IMPROVEMENTS
VISTA, CALIFORNIA
CIP 8381 VIA CENTRE DR, CIP 8382 SOUTH SANTA FE AVE
10/27/2026 C3 282 of 424
CLASSIFICATION TEST RESULTS
Gravel Sand
Coarse FineMediumCoarseFine
Silt or Clay
NOVA
GEOTECHNICAL
MATERIALS
SPECIAL INSPECTION
4373 Viewridge Avenue, Suite B
San Diego, CA 92123
P: 858.292.7575
www.usa-nova.com
16610 Aston Street
Irvine, CA 92606
P: 949.388.7710
SBEDVBE SDVOSB SLBE
Sample Location:
Depth (ft):
USCS Soil Type:
Passing No. 200 (%):
B-3 Atterberg Limits (ASTM D4318):
CH
63 10 -11½ Liquid Limit, LL:
Plastic Limit, PL:
Plasticity Index, PI:
58 15
43 FIGURE: C.5REVIEWED BY: PKDRAFTED BY: JS PROJECT: 3024048
SEWER CAPACITY IMPROVEMENTS
VISTA, CALIFORNIA
CIP 8381 VIA CENTRE DR, CIP 8382 SOUTH SANTA FE AVE
10/27/2026 C3 283 of 424
CLASSIFICATION TEST RESULTS
Gravel Sand
Coarse FineMediumCoarseFine
Silt or Clay
NOVA
GEOTECHNICAL
MATERIALS
SPECIAL INSPECTION
4373 Viewridge Avenue, Suite B
San Diego, CA 92123
P: 858.292.7575
www.usa-nova.com
16610 Aston Street
Irvine, CA 92606
P: 949.388.7710
SBEDVBE SDVOSB SLBE
Sample Location:
Depth (ft):
USCS Soil Type:
Passing No. 200 (%):
B-3 Atterberg Limits (ASTM D4318):
SC
40 15 - 16½ Liquid Limit, LL:
Plastic Limit, PL:
Plasticity Index, PI:
33 17
15 FIGURE: C.6REVIEWED BY: PKDRAFTED BY: JS PROJECT: 3024048
SEWER CAPACITY IMPROVEMENTS
VISTA, CALIFORNIA
CIP 8381 VIA CENTRE DR, CIP 8382 SOUTH SANTA FE AVE
10/27/2026 C3 284 of 424
CLASSIFICATION TEST RESULTS
Gravel Sand
Coarse FineMediumCoarseFine
Silt or Clay
NOVA
GEOTECHNICAL
MATERIALS
SPECIAL INSPECTION
4373 Viewridge Avenue, Suite B
San Diego, CA 92123
P: 858.292.7575
www.usa-nova.com
16610 Aston Street
Irvine, CA 92606
P: 949.388.7710
SBEDVBE SDVOSB SLBE
Sample Location:
Depth (ft):
USCS Soil Type:
Passing No. 200 (%):
B-4 Atterberg Limits (ASTM D4318):
SC
48 0 - 5 Liquid Limit, LL:
Plastic Limit, PL:
Plasticity Index, PI:
37 13
24 FIGURE: C.7REVIEWED BY: PKDRAFTED BY: JS PROJECT: 3024048
SEWER CAPACITY IMPROVEMENTS
VISTA, CALIFORNIA
CIP 8381 VIA CENTRE DR, CIP 8382 SOUTH SANTA FE AVE
10/27/2026 C3 285 of 424
CLASSIFICATION TEST RESULTS
Gravel Sand
Coarse FineMediumCoarseFine
Silt or Clay
NOVA
GEOTECHNICAL
MATERIALS
SPECIAL INSPECTION
4373 Viewridge Avenue, Suite B
San Diego, CA 92123
P: 858.292.7575
www.usa-nova.com
16610 Aston Street
Irvine, CA 92606
P: 949.388.7710
SBEDVBE SDVOSB SLBE
Sample Location:
Depth (ft):
USCS Soil Type:
Passing No. 200 (%):
B-5 Atterberg Limits (ASTM D4318):
SC
25 0 - 5 Liquid Limit, LL:
Plastic Limit, PL:
Plasticity Index, PI:
N/A
N/A
N/A
FIGURE: C.8REVIEWED BY: PKDRAFTED BY: JS PROJECT: 3024048
SEWER CAPACITY IMPROVEMENTS
VISTA, CALIFORNIA
CIP 8381 VIA CENTRE DR, CIP 8382 SOUTH SANTA FE AVE
10/27/2026 C3 286 of 424
LAB TEST RESULTS
NOVA
GEOTECHNICAL
MATERIALS
SPECIAL INSPECTION
4373 Viewridge Avenue, Suite B
San Diego, CA 92123
P: 858.292.7575
www.usa-nova.com
16610 Aston Street
Irvine, CA 92606
P: 949.388.7710
SBEDVBE SDVOSB SLBE
Sample
Location R-Value
Sample
Depth
(ft.)
R-Value (Cal. Test Method 301 & ASTM D2844)
B-1 90 - 5
B-3 470 - 3½
B-3 2.00
N/A
Moderate
Severe
Very Severe
S0
S1
S2
S3
No type restriction
II
V
V plus pozzolan or slag cement
N/A
0.50 0.45
0.45 2,500
4,000
4,500
4,500
Corrosivity (Cal. Test Method 417,422,643)
Sample
Location
Sample Depth
pH
Resistivity Sulfate Content
(ppm)(%)(Ohm-cm)(ft.)
0 - 5 N/A 4365 15 0.002B-1
Chloride Content
(ppm)(%)
33 0.003
N/A 16088 60 0.006 35 0.004
N/A 1980 390 0.039 573 0.057
N/A 2781 24 0.002 0 0.000
10/27/2026 C3 287 of 424
204
Appendix H:
Guidelines for Preparation of the Sewage Spill
Prevention and Response Plan
10/27/2026 C3 288 of 424
10/27/2026 C3 289 of 424
10/27/2026 C3 290 of 424
10/27/2026 C3 291 of 424
10/27/2026 C3 292 of 424
10/27/2026 C3 293 of 424
205
Appendix I:
CIP 8382 Preliminary Design Report w/ As-
Builts
10/27/2026 C3 294 of 424
Preliminary Design Report December 2025
S. Santa Fe Sewer Improvement Project (CIP No. 8382)
Preliminary Design Report
FOR
South Santa Fe Sewer Improvement
Project (CIP No. 8382)
Prepared for:
Steven Nowak, PE, PLS, QSD
Principal Engineer
City of Vista & Buena Sanitation District
200 Civic Center Drive
Vista, CA 92084
(760) 643-5403
[email protected]
Prepared by:
2970 Fifth Avenue, Ste. #340
San Diego, CA 92103
(619) 232-9200
REC Project No: 1940
December 2025
10/27/2026 C3 295 of 424
Preliminary Design Report December 2025
S. Santa Fe Sewer Improvement Project (CIP No. 8382)
Table of Contents
1.0 Introduction ............................................................................................................ 2
2.0 Project Description .................................................................................................. 2
3.0 Existing Site Conditions ............................................................................................ 3
3.1 Existing Site Conditions ........................................................................................ 3
3.2 Existing Sewer Infrastructure ................................................................................. 3
3.3 Other Existing Utilities .......................................................................................... 4
3.3.1 Water ............................................................................................................ 4
3.3.2 Storm Drain ................................................................................................... 4
3.3.3 Dry Utilities ................................................................................................... 5
3.4 Geotechnical & Groundwater Conditions ............................................................... 5
4.0 Proposed Sewer Design ........................................................................................... 5
4.1 Project Objective .................................................................................................. 5
4.2 Design Criteria ..................................................................................................... 6
4.3 Proposed Sewer Alignment ................................................................................... 7
4.4 Hydraulic Analysis ................................................................................................ 7
4.5 Surface Restoration .............................................................................................. 8 Appendices:
Appendix 1 – Existing Sewer GIS Exhibit
Appendix 2 – Draft Sewer Improvement Plan
Appendix 3 – Sewer Hydraulic Calculations
Appendix 4 – Design Support Reference Material
Appendix 5 – As-builts
10/27/2026 C3 296 of 424
Preliminary Design Report December 2025
S. Santa Fe Sewer Improvement Project (CIP No. 8382)
1.0 Introduction
On June 10, 2024, the City of Vista (City) issued a Request for Proposals (RFP) for professional engineering design services for two sewer improvement projects aimed at addressing capacity deficiencies in the existing wastewater collection system. One of these sewer improvement projects is the South Santa Fe Sewer Improvement project (CIP 8382) located along South Santa Fe Avenue, between Postal Way and Monte Vista Drive.
The scope of work outlined in the RFP includes preparation of a Preliminary Design Report (PDR), development of detailed sewer improvement plans, bid-phase support, and construction administration services. REC Consultants, Inc. submitted a proposal in response to the RFP and was subsequently selected by the City to perform the requested engineering services.
This purpose of this Preliminary Design Report (PDR) documents the engineering approach, design criteria, and key assumptions used to develop the proposed sewer improvement project. Its purpose is to provide a clear and concise summary of the technical rationale supporting the selected design, ensuring alignment with regulatory requirements, industry standards, and project-specific goals. The PDR serves as a foundational reference for the design team, stakeholders, and permitting agencies.
2.0 Project Description
The South Santa Fe Sewer Improvement Project is intended to address a capacity deficiency in the existing sanitary sewer system, as identified in the City’s 2025 Sewer Master Plan. Two existing 8” VCP sewer mains currently run along South Santa Fe Avenue, both originally constructed per Drawing No. A-016. One main is located along the north side of South Santa Fe, and the other along the south side. The southern sewer main has been identified as undersized for existing and projected flows, while the northern main has sufficient remaining capacity. To resolve this deficiency, the project proposes construction of a new sewer main to divert approximately half of the existing flow from the southern main into the northern main.
The project limits extend from the existing sewer manhole MH V26177 at the intersection of South Santa Fe and Monte Vista Drive to the existing sewer manhole MH V25065 located in front of 1050 South Santa Fe Avenue. At MH V26177, the manhole base will be reconstructed to include a concrete flow-splitter structure that directs approximately 50 percent of the incoming flow toward the new 10” sewer main. The new sewer will initially be installed along the south side of South Santa Fe before crossing to the north side. The total length of the 10/27/2026 C3 297 of 424
Preliminary Design Report December 2025
S. Santa Fe Sewer Improvement Project (CIP No. 8382)
proposed sewer improvements is approximately 880 linear feet. The proposed sewer improvements will be designed to accommodate future buildout flow conditions, as identified in the City’s Sewer Master Plan.
3.0 Existing Site Conditions
3.1 Existing Site Conditions
The project area extends from the intersection of South Santa Fe and Monte Vista Drive to the northwest along S. Santa Fe to a manhole in front of 1050 South Santa Fe Avenue. The area of work will be entirely within the paved limits of South Santa Fe Avenue, which is classified as 4-lane major road within the City. The surrounding area is primarily developed with commercial land uses, including shopping centers, restaurants, and retail establishments.
The project corridor is relatively flat, with surface elevations gradually descending from approximately 414 feet to 390 feet over 880 linear feet in the northwest direction. There are no known environmentally sensitive areas within the immediate project footprint.
3.2 Existing Sewer Infrastructure
Two existing 8” VCP sewer mains are present within the project area, both originally constructed per Drawing No. A-016.
The first sewer main, identified as deficient in the City’s 2025 Sewer Master Plan, becomes deficient at MH V26177, located at the intersection of South Santa Fe Avenue and Monte Vista Drive. Upstream of MH V26177 (to the southeast), two existing sewer mains converge and then flow northwesterly along the north side of South Santa Fe to this manhole.
Downstream of MH V26177 (to the northwest), the sewer continues along the north side of South Santa Fe before entering an adjacent automobile dealership property, crossing to the south side of the roadway, and ultimately flowing toward Civic Center Drive.
The second sewer main, also an 8” VCP line, begins within the project area at MH V25065 (constructed per Dwg. D-1285-S) in front of 1050 South Santa Fe Avenue. This manhole receives flow from the residential neighborhood to the north via a 6” VCP lateral system (also per Dwg. D-1285-S) and includes an 8” stub-and-plug on its southeast side. From MH V25065, the sewer flows northwest along the north side of South Santa Fe, collecting additional flow from adjacent commercial and residential parcels before continuing toward Civic Center Drive. This sewer main has ample capacity and flows from the previously mentioned deficient sewer main will be diverted to this main. 10/27/2026 C3 298 of 424
Preliminary Design Report December 2025
S. Santa Fe Sewer Improvement Project (CIP No. 8382)
3.3 Other Existing Utilities
The existing utilities within the project area have been identified based on available as-built plans obtained from the respective utility owners, supplemented by recent utility markouts conducted through Underground Service Alert (USA). These utilities include water, sewer, storm drain, gas, electric, communication lines, and street lighting infrastructure.
3.3.1 Water
Several existing water facilities owned and maintained by the Vista Irrigation District are located within the area of work along South Santa Fe Avenue.
Near the upstream end of the project, at the intersection of S. Santa Fe Avenue and Monte Vista Drive, there is a 30” CML&C water main (per Dwg. D-2061-1999) and two 8” ACP water mains (per Dwg. Nos. D-1404-1974 and D-1651-1802). These facilities continue south along South Santa Fe Avenue. The proposed sewer improvements will cross under these water mains and will maintain a minimum 1-foot vertical separation.
A 10” ACP water main (per Dwg. D-1404-1974) also runs along the north side of S. Santa Fe Avenue. The proposed sewer main will cross above this line at one location and then run roughly parallel to it until reaching the downstream connection at MH V25065. The minimum horizontal separation between the sewer and water facilities is approximately 4.5 feet, occurring near the manhole connection.
Additionally, a 6” CI water main (per Dwg. D-758-1956) exists along the south side of South Santa Fe Avenue. The proposed sewer improvements will be located more than 20 feet from this facility, providing sufficient horizontal clearance.
3.3.2 Storm Drain
A large existing RCP storm drain, ranging between 84” and 72”, constructed per Dwg. No. D- 1251 traverses the project area. The system originates at the Monte Vista Detention Basin and conveys flow south along Monte Vista Drive before crossing through the adjacent automobile dealership property. From there, the storm drain continues northwest along the centerline of South Santa Fe Avenue. The storm drain is an 84” RCP near the upstream project limits and reduces to 78” as it continues along the road. Several tributary lines discharge into this system, including a 42” RCP and two 18” RCP storm drains.
The proposed sewer alignment will cross beneath the 42” storm drain system near the intersection of Monte Vista Drive and South Santa Fe Avenue, and will later cross above the 78” RCP segment mid-way along the alignment. 1ft of vertical separation will be maintained when crossing the storm drain lines.
10/27/2026 C3 299 of 424
Preliminary Design Report December 2025
S. Santa Fe Sewer Improvement Project (CIP No. 8382)
3.3.3 Dry Utilities
Several dry utilities are located within the project area, including gas, electric, and communication lines. Gas and electric services are owned and maintained by San Diego Gas & Electric (SDG&E), while communication infrastructure is operated by AT&T and Cox Communications. In addition, City-owned street light conduits are present throughout the corridor.
The project area also contains multiple above-ground and below-ground utility vaults, junction boxes, and electrical transformers.
All known dry utility alignments have been incorporated into the project plans based on utility markings provided by Underground Service Alert (USA). However, due to the possibility of discrepancies, it is strongly recommended that the contractor request updated utility mark-outs through USA prior to the start of construction to verify the location of all dry utilities.
3.4 Geotechnical & Groundwater Conditions
A dedicated geotechnical report is not included as part of the design phase of this project.
The sewer improvements are located within an existing roadway with predictable soil conditions and the presence of multiple existing utilities at similar elevations provides support that the soil conditions are suitable for standard open-cut trenching.
According to USDA Web Soil Survey, the project area is underlain by Salinas clay loam which is a moderately fine-textured, well-drained soil with an anticipated depth to restrictive features and to groundwater of more than 80 inches. These soil characteristics suggest stable trench walls and minimal risk of collapse under the planned trench depths.
Shoring plans for portions of the sewer main that exceed approximately 5 to 6 ft, will be developed by the contractor and will be responsible for providing a geotechnical report to support the contractor’s shoring design as part of the construction submittals.
4.0 Proposed Sewer Design
4.1 Project Objective
The objective of the South Santa Fe Sewer Improvement Project is to resolve a capacity deficiency identified in the existing sewer main located along the south side of South Santa Fe Avenue. This deficiency begins at MH V26177, at the intersection of South Santa Fe Avenue and Monte Vista Drive. To address this issue, the project will reconstruct the 10/27/2026 C3 300 of 424
Preliminary Design Report December 2025
S. Santa Fe Sewer Improvement Project (CIP No. 8382)
manhole base at MH V26177 to incorporate a flow-splitting structure that diverts approximately half of the incoming flow into the existing sewer main on the north side of South Santa Fe Avenue, which has sufficient capacity to convey the projected peak wet weather flow under future buildout conditions.
4.2 Design Criteria
The proposed sewer improvements have been designed in accordance with the City of Vista’s standard design guidelines, the 2025 Sewer Master Plan, and applicable industry standards. The design is intended to eliminate capacity deficiencies identified in the existing system and accommodate peak wet weather flows under future buildout conditions. The table below summarizes key design criteria as it relates to the design:
Sewer Main Design Criteria
Parameter Value
Minimum Velocity 2.0 fps
Manning’s Roughness Coefficient 0.013
Minimum Pipe Size 8 inch
PWWF d/D ( 12-in diameter) < 0.66
Notes: d/D = depth/diameter; fps = foot per second; PWWF = peak wet weather flow The proposed sewer system improvements will also be designed and constructed in accordance with the following:
• City of Vista Standard Drawings
• San Diego Regional Standard Drawings (SDRSDs)
• Standard Specifications for Public Works Construction (Greenbook) The following design flow for the Peak Wet Weather build-out condition in 2050 was obtained from the 2025 Sewer Master Plan by Carollo Engineers for hydraulic analysis of the proposed sewer main.
Sewer Main Design Flowrates
Upstream Manhole No. Downstream Manhole No. Buildout PWWF V26175 V26177 1.108 mgd (1.71 cfs)
V26177 V26182 0.554 mgd (0.86 cfs)*
V26177 New MH 0.554 mgd (0.86 cfs)*
Note: PWWF = peak wet weather flow based on the build-out condition in 2050 as provided by 2025 Sewer Mast Plan by Carollo Engineers, mgd = million gallons per day, cfs = cubic feet per second * = In the proposed condition, the flow to MH V26177 will be spilt. 0.554 mgd (0.86 cfs) will flow to the new sewer main and will be utilized for the basis of this design. 10/27/2026 C3 301 of 424
Preliminary Design Report December 2025
S. Santa Fe Sewer Improvement Project (CIP No. 8382)
4.3 Proposed Sewer Alignment
The proposed sewer improvements begin at MH V26177, located at the intersection of South Santa Fe Avenue and Monte Vista Drive. The manhole base will be reconstructed to incorporate a concrete flow-splitting structure that evenly divides the incoming flow.
Approximately half of the flow will be conveyed westward into a new 10” PVC sewer main.
From MH V26177, the new sewer main will run northwest along the south side of South Santa Fe Avenue before crossing the roadway to the north side. The alignment then continues northwest along the north side of the street to the MH V25065, where it will connect by removing the existing 8” stub and installing the new 10” inflow pipe.
The initial placement of the alignment on the south side prior to crossing to the north was selected to avoid significant utility conflicts. The north side of South Santa Fe contains multiple major utilities, including a water main, two existing sewer mains, and an 84” RCP storm drain, making it infeasible to remain on that side for the full length of the project.
The proposed sewer main will cross several existing utilities along its alignment. At the upstream end, MH V26177 is situated at nearly the same elevation as the 42” RCP storm drain, requiring the new sewer to cross beneath the storm drain at a depth of approximately 15 feet below grade. Midway through the alignment, the sewer will cross above an existing sewer main, a water main, and the 78” RCP storm drain. Approximately 150 feet of the new sewer will require concrete encasement due to insufficient cover and to protect the water main at the point of crossing.
Additional crossings with existing gas and CATV lines are also anticipated. A segment of the proposed sewer main will also be parallel to a 2” gas line within 2 to 3 feet. These lines will require potholing and may need relocation prior to or during construction.
The depth of the proposed sewer main will range from approximately 3.5 feet to 15 feet. It is expected that open-cut construction will be utilized to construct the sewer main.
4.4 Hydraulic Analysis
Following the development of the proposed sewer main alignment and profile, the hydraulic capacity was evaluated to ensure compliance with the City of Vista’s design criteria. Design flow rates for Buildout Peak Wet Weather Flow (PWWF) conditions were obtained from the City’s 2025 Sewer Master Plan, as previously discussed in section 4.2. The design flow rate following the split in flow at the upstream manhole (V26177) is 0.554 mgd (0.86 cfs) for the new sewer main.
10/27/2026 C3 302 of 424
Preliminary Design Report December 2025
S. Santa Fe Sewer Improvement Project (CIP No. 8382)
Preliminary hydraulic sizing of the proposed sewer mains was performed using the Manning’s equation via Hydraflow Express, a tool within AutoCAD Civil 3D. Design inputs included proposed pipe diameters, slopes derived from the preliminary profile and Mannings roughness coefficients consistent with City standards. A summary of hydraulic results is provided in the table below:
Sewer Main Hydraulic Sizing Results
Pipe
No. Stations Pipe Internal
Diameter (in)
Slope
(%)
Buildout
PWWF (cfs) d/D v
(fps)
1 10+00 to
11+27
10" PVC SDR-
26 ASTM F679 9.93 1.42 0.86 0.40 4.3
2 11+27 to
13+00
10" PVC SDR-
26 ASTM F679 9.93 4.53 0.86 0.30 6.2
3 13+00 to
13+53
10" PVC SDR-
26 ASTM F679 9.93 0.99 0.86 0.45 3.7
4 13+53 to
17+96
10" PVC SDR-
26 ASTM F679 9.93 0. 56* 0.86 0.52 3.0
5 17+96 to
18+82
10" PVC SDR-
26 ASTM F679 9.93 6.95 0.86 0.27 7.4
Note: PWWF = peak wet weather flow based on the build-out condition in 2050 as provided by Carollo Engineers, d/D = depth/Diameter, v = velocity, fps = feet per second The results confirm that the proposed sewer mains meet or exceed the City's minimum design requirements, including minimum pipe diameter and minimum flow velocity.
However, the d/D of Pipe No. 4 (approximately 440 LF) is calculated to be 0.52, which slightly exceeds the City’s criterion of 0.50 and corresponds to an additional flow depth of approximately 0.2 inches. Achieving a d/D of 0.50 would require increasing the pipe slope, which would raise the sewer invert at the crossing beneath the existing 42” RCP storm drain and reduce the vertical separation to less than 1 foot. Alternatives such as adding a manhole before the crossing to meet vertical separation or upsizing the sewer main were considered, but given the minimal exceedance, maintaining the current design is the most cost-effective approach. The city’s criterion of a d/D less than 0.50 is achieved for all other segments of the proposed sewer main.
4.5 Surface Restoration
Construction of the new sewer main along S. Santa Fe Avenue will require trenching within the paved roadway. After installation, all disturbed improvements will be restored to match existing conditions. Restoration is expected to be minimal and will include replacement of AC pavement, reinstallation of traffic loop cable, and re-striping of any pavement markings affected by construction.
10/27/2026 C3 303 of 424
Preliminary Design Report December 2025
S. Santa Fe Sewer Improvement Project (CIP No. 8382)
Appendix 1 – Existing Sewer GIS Exhibit
10/27/2026 C3 304 of 424
T1210
T1917T655T1213T2385 T2051
T2292
T2071
T944
T941
T1066
T1066
T1127
T2055
T1063
T762
T1054
T1160
T1045
T2380 T779 T2209
T2101
T1033
T770
T1076
T1086
T2221
T2332
T2208
T2161
T1055
T1206
T1122
T1078
T2125
T2297
T1073
T1213
T1085
T2217
T2222
T960
T2270
T1118
T2250
T620
T1040
T1217
T1043
T1122
T2104
T1154
T2367
T2273
T2098
T2061
T2240
T1057
T2410
T955
T1090
T1037
T2096
T1116
T2280
T2205
T1125
T2215
T782
T2211
T759
T1085
T931
T1215 T2117
T1120
T2140
T1056
T2354
T0
T948
T1096
T955
T1051
T2158
T2090
T947
T1043
T2129
T2203
T1082
T2244
T1040
T1048
T2228
T1156
T2144
T1047
T2274
T790
T1221 T940
T1050
T2206
T2349 T2207
T952T1028
T971
T947
T2213
T1086
T1084
T775 T2121 T2067
T1075 T1065
T2202
T1051
T2326
T974
T967
T1152
T1211
T1036
T1118
T1044T1049
T1217
T2204
T2340
T1150
T2239
T2376
T1084
T1112
T2224
T1045
T1114
T2175
T965
T935
T2210
T1041
T1201
T2302
T1110
T2223
T937
T917
T2248
T1063
T2305
T763
T929
T1126
T2169
T1072
T2269
T921T1205
T2108
T1065
T934
T2123
T2203
T1069
T2150
T991
T1081
T2345
T2259
T1209
T1070
T2212
T2080
T2219
T1083
T1068
T2081
T983
T2200
T975
T2091
T1181
T1081
T755
T2133
T1219
T2290 T923
T1075
T2294
T1060
T1056 T1046
T1130
T1121 T1015
T2201
T1043
T2267
T1042
T1042
T1035
T982
T2375
T1087
T1094
T758
T2115
T1081
T2298
T2293
T1018
T1158
T1069
T1202
T2330a
T1048
T2165
ALTAVISTA DR
ALTAVISTA DR
ALTA VISTA DR
ALTA
C
A
L
L
E
CYPRESSDR
CROMWELL WY
CHE
L
S
E
A
C
T
NOSTALGIAPL
RANCHO PACIFICAPL
EL P
A
J
O
D
O
P
L
ALTAVISTATE
MONTE VISTA DR
S SANTAFEAV
440
440
450
470
580510
410
410
490
400
500
540
570
550
550
460
560
540
50 0
390
540
430
490
560
56 0
450
510
430
4 40
4 50
430
420
510
520
460
470
480
540
520
460
510
440
50 0
540
570
440
5 10
470
490
530
480
400
500
8" V
C
P
263
'
NS4
5 2
8"
V
C
P
155
'
NS
6 3
8 8" V
C
P196'
A
0 5
9 8" VCP
230' A059
8" VCP
2 9
5 'A-059/P
N
2 7
7 3
V2318
0 -
V
2 3
1 8
1 (1961
)
V2
6 0
2 1
-
V
2 6
0 2
2 (19
6 6
)
V250
0 7
-
V
2 5
0 0
8 (
1 9
6 1
)
V25010-V25011 (1961)
V25
0 1
3 -
V
2 5
0 1
4 (
1 9
6 3
)
V23183
-
V
2 3
1 8
5 (
1 9
6 1
)
V25062
V25058
V26039
V23175
6" VC
P
25'
D136
3 8" V
C
P
3 6
'
VSD
-
0 0
1 8" V
C
P
167
'
D12
5 1
8" P
V
C
52' D
3 3
0 1
8" VCP
60'
D1251
8"
V
C
P
70 '
D1
6 6
7 8"
V
C
P
8 0
'
VS
D
-
0 0
1 8" VC
P
84'
D1150
8"
V
C
P
8 5
'
VS
D
-
0 0
1 8"
V
C
P
88'
D1
6 6
7 8" VC
P344'
A
-
0 1
6 6" V
C
P
364'
D10
5 0
8" VCP
120'
D1251
8"
V
C
P
123
'
A0
5 9
6" VC
P
123'
D128
5 8" V
C
P
125
'
VS
D
-
0 0
1 8"
V
C
P
128
'
D1
6 6
7 8" V
C
P
1 3
6 '
D13
6 3
8" 145'
NS696
8"
V
C
P
15 1
'
VS
D
-
0 0
1 6"
V
C
P
145
'
D1
3 0
2 8" VCP
152'
A059
8" VC
P
153'A059
8"
P
V
C
15 1
'
D
3 5
3 7
8"
V
C
P
15 5
'
NS
6 3
8 8" V
C
P
159
'A05
9 8"
V
C
P
16 4
'
A
0 5
9 8" VCP
165' NS540
8" VCP
137'VSD-001
8" VCP 167'
VSD-001
8" VCP
156'
NS638
6" V
C
P
170
'
D12
8 5
8"
V
C
P
17 2
'
D1
0 5
0 8"
V
C
P
1 8
3 '
NS
6 3
8 8"
V
C
P
1 9
2 '
VS
D
-
0 0
1 8" VCP
180' A059
8"
V
C
P
187
'
VS
D
-
0 0
1 8" VCP
191'
VSD-001
8" V
C
P
2 0
6 '
D
1 3
6 3
8"
V
C
P
2 0
1 '
D
1 0
5 0
8" VCP206' A
0 5
9 8"
V
C
P
20 8
'
V
S
D
-
0 0
1 8" VCP
208'VSD-00
1 8" V
C
P196'
A
0 5
9 8" VC
P
2 7
0 '
A
6 3
-
0 2
8" VCP
230' A059
8"
V
C
P
2 1
7 '
VS
D
-
0 0
1 8"
V
C
P
2 3
2 '
D
1 5
2 4
8"
V
C
P
2 2
5 '
VS
D
-
0 0
1 6" VC
P
2 2
7 '
N
S
4 5
2 8"
V
C
P
2 3
0 '
V
S
D
-
0 0
1 8"
V
C
P
2 3
5 '
V
S
D
-
0 0
1 8"
V
C
P
2 4
0 '
D
1 5
2 4
8" V
C
P
2 3
9 '
D
1 3
6 3
8"
V
C
P
239
'
A
0 5
9 8" V
C
P
2 4
5 '
N
S
5 4
0 8" VC
P
2 5
0 '
VSD-
0 0
1 8" V
C
P
2 5
8 '
A
-
0 1
6 8" VCP
2 6
7 '
VSD-0
0 1
8"
V
C
P
2 7
0 '
V
S
D
-
0 0
1 6" V
C
P
2 8
7 '
D
1 3
0 2
8" VCP 277'
VSD-001
8" V
C
P
2 9
7 '
VS
D
-
0 0
1 8" VCP
2 9
5 'A-059/P
N
2 7
7 3
8" V
C
P
2 9
6 '
A
0 5
9 8"
V
C
P
3 2
2 '
V
S
D
-
0 0
1 8" V
C
P
3 7
9 '
A
-
0 1
6 V26178
V26063
V26045
V25012
V26019
V26061
V26050
V25070.AA
V23148
V23180
V26069.B0
V25007
V23182
V26069.C0
V23149
V23183
V26069.A0
V26018V26183
V26062
V26068
V26187
V26186
V26185 V26184
V26182
V26181
V26180
V26179
V26069
V26067
V26066
V26065
V26064
V26059
V26058
V26057
V26056
V26055
V26054
V26053
V26052
V26051
V26049
V26048
V26047
V26046
V26044
V26043
V26042
V26041
V26040
V26038
V26037
V26028
V26027
V26022
V26021
V26020
V25070.A0
V25066
V25065
V25064
V25063
V25061
V25060
V25059
V25018
V25016
V25015
V25014
V25013
V25010
V25009
V25008
V23186
V23181
V23177
V23176
V23185
V25011
V-26
V-25
V-23
21 _
1 3
20 _
1 3
22 _
1 3
20_14
22_14
22 _
1 5
20 _
1 5
21 _
1 5
2017 Orthophoto Last Revised: 6/22/2021
Disclaimer: This product is for informational purposes and may not have been prepared for, or be suitable for legal, engineering, or surveying purposes. Users of this
information should review or consult the primary data and information sources to ascertain the usability of the
information.
Sewer Valves
"Ï Air Vacuum
Ê Ball
ÊË Blow Off
&É Butterfly
ÍÏ Check
!A Cone
&.Gate
!=Plug
0 Tapping
Unknown
Sewer Fittings
!)5 Bend
%«Cap
ÍÎ/Coupling
ÑF!Cross
"))Offset
"')Reducer
&SC Riser
£Saddle
ÍÎá Sleeve
"Tap
Ð"î""Tee
"ºÎ Weld
Ð%î"Wye
Sewer Structures
"¶)Grease
Interceptor
"i Grease Trap
"S Junction Box
"X)Odor Control
Station
!R)Pigging Station
"!)Pump
"C)Pump Station
"?)Sand and Oil
Seperator
"Û)Sluice Gate
"*)Treatment Plant
"V)Valve Box
!Sewer Permits
"C`Sewer Meters
Sewer
Easements
Sewer Basins
Buena
Sanitation
District
City Limits
¬«Fire Hydrant
J£Access Gates
Flow Agreement
Flow &
Maintenance
Agreement
10' Contours
Parcels
Mains
Gravity Main
Siphon Main
Trunk Line
Abandoned
Drop Trunk
Line
Force Main
Excess Effluent
Laterals
Mains -
Private/Other
Cured in
Place Pipe
Monitor!M(
º0 200100feet
1:2,400
Private
!!2 Drop Manhole
!,Standard
!P Cleanout
!<Plug
Public
!,Standard
!P Cleanout
!<Plug
!!2 Drop Manhole
Sheet21_14
10/27/2026 C3 305 of 424
T1158
T1040
T1365T1357
T1112
T1172
T1360
T1124
T1081T1046T1043
T1336
T1264 T1018
T1327
T1255
T1085
T1207
T1229
T1333 T1351
T1250
T1217
T1339
T1209
T1188
T1278
T1155
T1364
T1283
T1307
T1131
T1235T1239
T1327T117 T1295
T1220
T1140
T1315
T1200
T1055
T1325
T1125
T1331
T1345
T1245 T1281
T1305
T1305
T1112
T1287
T1356
T1252
T1149
T1205 T1211
T1314
T1352
T1224
T1240
T1130
T1315 T1310
T1118
T1251
T1101
T1141
T1227
T1215
T1335
T1346
T1221
T1168
T1288
T1322
T1208
T1254
T1207
T1250
T1235
T1237
T1228 T1354
T1203
T1147T1240
T1285
T1096
T1145
T1324 T1306
T1255
T1250
T1340
T1166
T1338
T1320
T989
T1209
T1007
T1205
T1119
T1302
T1237
T1277
T1325
T1013
T1136
T1285
T1151
T1139
T1243
T1295
T1285
T1320
T1279
T1270
T1201
T1233
T1024
T1290
T1315
T1213
T1350
T1217
T1332
T1216
T1327 T1311
T1246
T1112
T1241
T1124
T1215
T1157
T1337
T1248
T1225
T1306
T1150
T1368
T1237
T1213
T1320
T1292
T1225
T1209
T1265
T1233
T1149
T1354
T1212
T1233
T1337
T1006
T1245
T1266
T1260
T1324
T1289
T1215
T1353
T1205
T1312
T125
T1243
T405
T1332
T1121
T1344
T1216
T1160
T1234
T1025
T1235
T1143
T1069
T1310
T1355
T1201
T1275T1215
T1303
T1244
T1317
T1201
T1275
T1366
T1275
T1135
T1319T1222
T1115
T1221
T1229
T1265
T1019
T1258
T1210
T1056
T1213
T1347
T1144
T1247
T1263
T1315
T1355
T1213
T1218
T1136
T1201
T1127
T1204
T1214
T1358
T1260
T1094
T1138
T1363
T1284
T1150
T1311
T1322
T1215
T111
T1165
T1264
T111
PHILLIPS ST
ALLE
A
L
N
SERVIC
E
P
L
LONI LN
MORNING GLORY LN
JESSIE LN
KELGLEN LN
MES
Q
U
I
T
E
D
R
SANDRACR
CYPRESSDR
KI LBYLN
CYP
R
E
S
S
D
R
SSANTAFEAV
S SA
N
T
A
F
E
A
V
MONTE VISTA DR
550
500
48 0
530
460
470
500
510
490
480
450
520
530
430
510
460
560
560
490
540
570
410
480
500
550
470
430
560
540
410
520
420
570
510
550
440
600
420
39 0
470
510
530
440
440
600
400
440
480
470
520
600
450
530
590
410
580
V26198-V26199
(1966)
V26
2 0
3 -
V
2 6
2 0
4 (196
6 )
V2
6 2
0 2
-
V
2 6
2 0
3 (
1 9
6 6
)
V26
1 6
3 -
V
2 6
1 7
3 (
1 9
6 6
)
V28001
V26098
V26079
V26184.A0
V262688" P
V
C
4' D
1 9
2 9
8" V
C
P
154
'
A-1
1 6
8"
P
V
C
29 '
D4
5 6
2 8"
V
C
P
4 5
'
D3
2 3
8 8"
P
V
C
3 6
3 '
D1
7 6
0 6" 10
3 'D131
1 8" V
C
P
60'
D
1 2
5 1
8" VC
P
8 2
'
A-016
8" VCP
62'
VS-70-1
8"
V
C
P
66 '
A-1
1 6
8" P
V
C
76'
D
4 5
6 2
8"
V
C
P
71'
NS
6 3
2 8" VCP
102'
NS632
8" V
C
P
10'A-0
1 6
8" V
C
P
81'A-1
1 6
8" VCP
84'
D1648
8"
V
C
P
85 '
D1
3 3
4 8" VCP
87'
D1877
8"
V
C
P
93'
D1
5 3
6 8" V
C
P
94'
A
-
1 1
6 8" V
C
P
107
'
D1
6 4
9 8" V
C
P
112
'
D
1 6
4 9
8" VCP
112'
D1649
8"
V
C
P
21 7
'
VS
D
-
0 0
1 8" V
C
P
125
'
D1
6 4
9 8"
V
C
P
23 2
'
D1
5 2
4 8" V
C
P
135
'
D
1 6
4 9
8" PVC
134' D4023
8" VCP 142'
VS-70-1
8" VCP
140'
D1521
8" VCP 142'
VSD-001
8"
V
C
P
145
'
D1
7 2
1 8" VC
P148' A
-
1 1
6 8" V
C
P
155
'
D32
3 8
10" PV
C
167'
3979
8" VCP
215' A-
1 1
6 8" V
C
P
167
'
D
1 2
5 1
8" VCP
167'
VSD-001
8" PV
C
168'
D
3 1
4 3
8" D
I
P162
'
D3
1 4
3 8" VCP
213' D1641
8"
V
C
P
147
'
D
1 7
6 0
8"
V
C
P
228
'
VS
-
7 0
-
1 8"
V
C
P
1 7
7 '
A-1
1 6
8" VCP 1
7 9
'
NS-91
8" V
C
P
3 0
2 '
VS
-
7 0
-
1 8" P
V
C
186
'
3 9
7 9
8" VCP
187'
D1648
8" V
C
P
1 9
0 '
A
-
0 1
6 8"
V
C
P
2 6
1 '
D
1 8
7 7
8"
V
C
P
1 9
0 '
D
1 7
2 1
10" P
V
C
185'
D402
3 8" VCP 195' A-116
10"
P
V
C
194
'
3 9
7 9
10" P
V
C
176'
3 9
7 9
6" VCP
205' NS
9 1
8" V
C
P
2 1
4 '
A
-
1 1
6 8" V
C
P
2 1
6 '
A
-
1 1
6 8" V
C
P
2 2
1 '
D
1 6
4 9
8" VCP
2 2
2 '
N
S
6 3
2 8" VCP
2 2
3 '
D
1 6
3 3
-
S
8" V
C
P
2 3
2 '
A
-
0 1
6 8" V
C
P
3 3
7 '
A
-
1 1
6 8" V
C
P
2 4
1 '
A
-
1 1
6 8"
V
C
P
2 5
5 '
A
-
1 1
6 8" V
C
P
2 6
3 '
A
-
0 1
6 8" VC
P
2 7
0 '
A
6 3
-
0 2
8" V
C
P
2 9
0 '
A
-
0 1
6 10" PV
C
283' 39
7 9
8" V
C
P
2 9
9 '
A
-
1 1
6 8" P
V
C
3 0
7 '
D
1 9
2 9
8" VCP
3 1
1 '
D
1 9
5 6
8" P
V
C
3 1
5 '
D
1 9
2 9
8"
V
C
P
3 5
0 '
D
1 5
3 6
8" VCP 367' NS630
8"
P
V
C
3 6
3 '
D
1 3
3 4
8" VCP 362' A63-02
8" V
C
P
3 7
5 '
V
S
-
7 0
-
1 8" V
C
P
3 7
5 '
A
-
0 1
6 V26167
V26164
V26074
V26083
V26218
V26170.A0
V26023
V26069.B0
V26253
V26270
V26169.A0
V26252
V26086
V26273V26072
V26085
V26254
V26069.C0 ABN_V26030
V26256
V26080
V26092
V26095
V26271
ABN_V26071
V26029V26269
ABN_V26070
V26257
V26177
V26026
V26272
V26018
ABN_V26073.00
V26091
V26183
V26060V26068
V26203
V26173
V26174
V26158
V28002
V26202
V26200
V26199 V26198
V26197
V26196
V26195
V26194
V26182
V26175
V26172V26171
V26170.B0
V26170
V26169.B0
V26169
V26168
V26166
V26165
V26163
V26162
V26161
V26160
V26157
V26156
V26155
V26153
V26108
V26107 V26099
V26086.A0
V26084
V26082 V26081
V26078.C0
V26078.B0
V26078.A0
V26078
V26076
V26075
V26069
V26025
V26024
V26094
V26093
V26159
V26150 V26277
V26278
V26279
V26280
V26283
V26247
V-28
V-26
22 _
1 3
21 _
1 3
23 _
1 3
21_14
23_14
23 _
1 5
21 _
1 5
22 _
1 5
2017 Orthophoto Last Revised: 6/22/2021
Disclaimer: This product is for informational purposes and may not have been prepared for, or be suitable for legal, engineering, or surveying purposes. Users of this
information should review or consult the primary data and information sources to ascertain the usability of the
information.
Sewer Valves
"Ï Air Vacuum
Ê Ball
ÊË Blow Off
&É Butterfly
ÍÏ Check
!A Cone
&.Gate
!=Plug
0 Tapping
Unknown
Sewer Fittings
!)5 Bend
%«Cap
ÍÎ/Coupling
ÑF!Cross
"))Offset
"')Reducer
&SC Riser
£Saddle
ÍÎá Sleeve
"Tap
Ð"î""Tee
"ºÎ Weld
Ð%î"Wye
Sewer Structures
"¶)Grease
Interceptor
"i Grease Trap
"S Junction Box
"X)Odor Control
Station
!R)Pigging Station
"!)Pump
"C)Pump Station
"?)Sand and Oil
Seperator
"Û)Sluice Gate
"*)Treatment Plant
"V)Valve Box
!Sewer Permits
"C`Sewer Meters
Sewer
Easements
Sewer Basins
Buena
Sanitation
District
City Limits
¬«Fire Hydrant
J£Access Gates
Flow Agreement
Flow &
Maintenance
Agreement
10' Contours
Parcels
Mains
Gravity Main
Siphon Main
Trunk Line
Abandoned
Drop Trunk
Line
Force Main
Excess Effluent
Laterals
Mains -
Private/Other
Cured in
Place Pipe
Monitor!M(
º0 200100feet
1:2,400
Private
!!2 Drop Manhole
!,Standard
!P Cleanout
!<Plug
Public
!,Standard
!P Cleanout
!<Plug
!!2 Drop Manhole
Sheet22_14
10/27/2026 C3 306 of 424
Preliminary Design Report December 2025
S. Santa Fe Sewer Improvement Project (CIP No. 8382)
Appendix 2 – Draft Sewer Improvement Plans
10/27/2026 C3 307 of 424
CITY of VISTA
WORK TO BE DONE
DECLARATION OF RESPONSIBLE CHARGE
KEY MAP LEGEND
REFERENCE DRAWINGS
SHEET INDEX
GENERAL NOTES SEWER IMPROVEMENT PLANS FOR:
S. SANTA FE SEWER IMPROVEMENTS
TOPOGRAPHY SOURCE
LEGAL DESCRIPTION
LEGEND
PROPERTY ADDRESS
OWNER/APPLICANT
APN
SPECIAL NOTES
EXISTING
PROPOSED
PROJECT
SITE
N
4 5
EX. MANHOLE
STA: 9+95.00
EX. MANHOLE
STA: 18+82.35
4 N
STATIONING NOTE
10/27/2026 C3 308 of 424
CITY of VISTA
“”
“”
“”
”
””
SEWER NOTES
LEGEND OF ABBREVIATIONS:
CONSTRUCTION NOTES
’
’
’
’
’
’
’
’
“”
VISTA IRRIGATION DISTRICT (DISTRICT) NOTES
A EX. MH DETAIL (STA 10+00.00 ~ L1)
B EX. MH DETAIL (STA 18+82.35 ~ L7)
10/27/2026 C3 309 of 424
CITY of VISTA
M
A
T
C
H
L
I
N
E
-
S
E
E
T
O
P
R
I
G
H
T
M
A
T
C
H
L
I
N
E
-
S
E
E
B
O
T
T
O
M
L
E
F
T
1042 S. SANTA FE DR.
APN: 180-310-10
1050 S. SANTA FE DRIVE
APN: 180-310-11
1070 S. SANTA FE DRIVE
APN: 180-310-15
1031 S. SANTA FE DRIVE
APN: 180-330-03
1051 S. SANTA FE DRIVE
APN: 180-330-04
1085 S. SANTA FE DRIVE
APN: 180-330-07
1094 S. SANTA FE DRIVE
APN: 180-320-03
1112 S. SANTA FE DRIVE
APN: 180-163-05
1082 S. SANTA FE DRIVE
APN: 180-320-17
S. SANTA FE DRIVE
APN: 180-330-10
1121 S. SANTA FE DRIVE
APN: 180-330-13
1115 S. SANTA FE DRIVE
APN: 180-330-12
10/27/2026 C3 310 of 424
CIP 8382 - NEW 10 INCH SEWER - PROFILE
375
380
385
390
395
400
405
410
375
380
385
390
395
400
405
410
SEWER DATA TABLE
CITY of VISTA
” ”
CONSTRUCTION NOTES
POTHOLE NOTE:
14 +
2 5
.
0 0
M
A
T
C
H
L
I
N
E
SE
E
S
H
E
E
T
5 1042 S. SANTA FE DR.
APN: 180-310-10
1050 S. SANTA FE DRIVE
APN: 180-310-11
1070 S. SANTA FE DRIVE
APN: 180-310-15
1031 S. SANTA FE DRIVE
APN: 180-330-03
1051 S. SANTA FE DRIVE
APN: 180-330-04
10/27/2026 C3 311 of 424
CIP 8382 - NEW 10 INCH SEWER - PROFILE
390
395
400
405
410
415
420
390
395
400
405
410
415
420
SEWER DATA TABLE
CITY of VISTA
” ”
CONSTRUCTION NOTES
POTHOLE NOTE:
14 +
2 5
.
0 0
M
A
T
C
H
L
I
N
E
SE
E
S
H
E
E
T
4 1085 S. SANTA FE DRIVE
APN: 180-330-07
1094 S. SANTA FE DRIVE
APN: 180-320-03
1112 S. SANTA FE DRIVE
APN: 180-163-05
1082 S. SANTA FE DRIVE
APN: 180-320-17
S. SANTA FE DRIVE
APN: 180-330-10
1121 S. SANTA FE DRIVE
APN: 180-330-13
1115 S. SANTA FE DRIVE
APN: 180-330-12
10/27/2026 C3 312 of 424
CITY of VISTA
TRAFFIC STRIPING NOTES
SURFACE IMPROVEMENT NOTES
M
A
T
C
H
L
I
N
E
-
S
E
E
T
O
P
R
I
G
H
T
M
A
T
C
H
L
I
N
E
-
S
E
E
B
O
T
T
O
M
L
E
F
T
1050 S. SANTA FE DRIVE
APN: 180-310-11 1070 S. SANTA FE DRIVE
APN: 180-310-15
1031 S. SANTA FE DRIVE
APN: 180-330-03
1051 S. SANTA FE DRIVE
APN: 180-330-04
1085 S. SANTA FE DRIVE
APN: 180-330-07
1094 S. SANTA FE DRIVE
APN: 180-320-03 1112 S. SANTA FE DRIVE
APN: 180-163-051082 S. SANTA FE DRIVE
APN: 180-320-17
S. SANTA FE DRIVE
APN: 180-330-10
1121 S. SANTA FE DRIVE
APN: 180-330-13
1115 S. SANTA FE DRIVE
APN: 180-330-12RESTRIPING NOTES
10/27/2026 C3 313 of 424
Preliminary Design Report December 2025
S. Santa Fe Sewer Improvement Project (CIP No. 8382)
Appendix 3 – Sewer Hydraulic Calculations
10/27/2026 C3 314 of 424
Maximum Flow
(mgd)
Maximum d/D
(in/in)
Maximum Flow
(mgd)
Maximum d/D
(in/in)
Maximum Flow
(mgd)
Maximum d/D
(in/in)
Maximum Flow
(mgd)
Maximum d/D
(in/in)
Existing 2024 PDWF Existing PWWF Buildout PDWF Buildout PWWF Asset ID Model ID
Length
(ft)
Diameter
(in)
Slope
(ft/ft)
Full Flow
(mgd)
V26168-V26169 V26168-V26169 133.75 8 0.1195 2.70 0.000 0.03 0.003 0.07 0.000 0.03 0.003 0.07 V26169.A0-V26169.B0 V26169.A0-V26169.B0 299.96 8 0.1332 2.85 0.002 0.03 0.008 0.05 0.003 0.03 0.009 0.05 V26169.B0-V26169 V26169.B0-V26169 314.79 8 0.0611 1.93 0.003 0.04 0.012 0.09 0.003 0.04 0.013 0.09 V26169-V26170 V26169-V26170 221.07 8 0.0064 0.63 0.004 0.05 0.017 0.10 0.004 0.06 0.018 0.11 V26170.A0-V26170.B0 V26170.A0-V26170.B0 169.46 8 0.0677 2.04 0.001 0.03 0.006 0.06 0.001 0.07 0.006 0.09 V26170.B0-V26170 V26170.B0-V26170 169.94 8 0.0065 0.63 0.002 0.04 0.010 0.08 0.020 0.12 0.024 0.13 V26170-V26171 V26170-V26171 114.68 8 0.1116 2.61 0.006 0.04 0.035 0.10 0.024 0.08 0.050 0.12 V26171-V26172 V26171-V26172 180.8 8 0.0440 1.64 0.007 0.05 0.042 0.11 0.033 0.11 0.064 0.14 V26172-V26173 V26172-V26173 205.95 6 0.0596 0.89 0.007 0.15 0.042 0.33 0.050 0.24 0.078 0.38 V26173-V26174 V26173-V26174 101.78 8 0.0246 1.23 0.078 0.19 0.376 0.52 0.157 0.28 0.450 0.71 V26174-V26257 V26174-V26257 60.57 8 0.0196 1.10 0.078 0.61 0.376 0.83 0.157 0.66 0.457 1.00 V26175-V26177 V26175-V26177 232.31 8 0.0177 1.04 0.189 0.29 0.939 0.74 0.382 0.42 1.108 1.00 V26177-V26182 V26177-V26182 167.13 8 0.0115 0.84 0.189 0.29 0.941 1.00 0.393 0.44 1.118 1.00 V26178-V26179 V26178-V26179 70.11 8 0.0101 0.79 0.001 0.02 0.010 0.08 0.002 0.04 0.011 0.08 V26179-V26180 V26179-V26180 130.59 8 0.0266 1.28 0.001 0.02 0.013 0.06 0.003 0.03 0.015 0.07 V26180-V26181 V26180-V26181 88.25 8 0.1270 2.79 0.001 0.01 0.014 0.05 0.003 0.05 0.017 0.07 V26181-V26182 V26181-V26182 204.81 8 0.1110 2.61 0.001 0.13 0.017 0.53 0.029 0.22 0.039 0.54 V26182-V26183 V26182-V26183 60.49 8 0.0347 1.46 0.190 0.32 0.955 1.00 0.430 0.51 1.161 1.00 V26183-V26185 V26183-V26185 192.38 8 0.0057 0.59 0.190 0.38 0.958 0.93 0.430 0.61 1.161 0.96 V26184.A0-V26184 V26184.A0-V26184 257.95 8 0.0198 1.10 0.000 0.12 0.002 0.24 0.000 0.16 0.002 0.26 V26184-V26185 V26184-V26185 57.71 8 0.0052 0.56 0.001 0.43 0.008 0.64 0.003 0.51 0.008 0.68 V26185-V26186 V26185-V26186 119.84 8 0.0941 2.40 0.034 0.10 0.445 0.36 0.145 0.21 0.564 0.42 V26186-V26187 V26186-V26187 380.66 8 0.0211 1.14 0.037 0.12 0.452 0.44 0.163 0.26 0.582 0.51 V26187-V26189 V26187-V26189 232.15 8 0.0222 1.17 0.038 0.13 0.456 0.44 0.164 0.26 0.586 0.51 V26188-V26189 V26188-V26189 185.05 6 0.0043 0.24 0.000 0.09 0.000 0.30 0.000 0.17 0.000 0.35 V26189-V26190 V26189-V26190 153.43 8 0.0200 1.11 0.039 0.13 0.456 0.44 0.165 0.26 0.587 0.51 V26190-V26191 V26190-V26191 364.62 8 0.0238 1.21 0.040 0.13 0.462 0.46 0.183 0.28 0.605 0.54 V26191-V26236 V26191-V26236 362.76 8 0.0152 0.96 0.040 0.18 0.464 0.59 0.183 0.33 0.607 0.67 V26192-V26193 V26192-V26193 266.87 8 1.1451 8.37 0.003 0.02 0.009 0.03 0.003 0.02 0.010 0.03 V26193-V26194 V26193-V26194 155.54 8 1.1457 8.37 0.004 0.02 0.015 0.03 0.004 0.02 0.015 0.03 V26194-V26195 V26194-V26195 177.86 8 1.1453 8.37 0.004 0.02 0.017 0.03 0.005 0.02 0.017 0.04 V26195-V26196 V26195-V26196 211.47 8 1.1453 8.37 0.005 0.02 0.020 0.04 0.005 0.02 0.021 0.04 V26196-V26197 V26196-V26197 69.26 8 1.1464 8.37 0.005 0.02 0.020 0.04 0.005 0.02 0.021 0.04 V26197-V26198 V26197-V26198 81.1 8 1.1455 8.37 0.006 0.02 0.027 0.04 0.007 0.02 0.027 0.04 V26198-V26199 V26198-V26199 193.55 8 1.1454 8.37 0.006 0.02 0.028 0.04 0.007 0.02 0.029 0.04 V26199-V26200 V26199-V26200 147.95 8 1.1457 8.37 0.007 0.02 0.030 0.04 0.007 0.02 0.030 0.05 V26200-V26202 V26200-V26202 240.94 8 1.1451 8.37 0.008 0.02 0.034 0.05 0.008 0.03 0.035 0.05 V26201-V26202 V26201-V26202 208.65 8 1.1455 8.37 0.001 0.02 0.009 0.04 0.003 0.02 0.010 0.04 V26202-V26203 V26202-V26203 253.94 8 1.1452 8.37 0.010 0.03 0.047 0.06 0.012 0.03 0.049 0.06 V26203-V26204 V26203-V26204 335.81 8 1.1450 8.37 0.011 0.03 0.056 0.06 0.013 0.03 0.058 0.06 V26204-V26205 V26204-V26205 226.78 8 1.1452 8.37 0.012 0.03 0.061 0.06 0.014 0.03 0.063 0.06 V26205-V26206 V26205-V26206 181.98 8 1.1452 8.37 0.013 0.03 0.062 0.06 0.015 0.03 0.064 0.06 V26206-V26207 V26206-V26207 259.31 8 1.1453 8.37 0.014 0.03 0.067 0.06 0.016 0.03 0.069 0.06 10/27/2026 C3 315 of 424
Channel Report
Hydraflow Express Extension for Autodesk® Civil 3D® by Autodesk, Inc.Tuesday, Dec 9 2025 Pipe 1 - 10in Sewer Main (S. Santa Fe)
Circular
Diameter (ft)= 0.83
Invert Elev (ft) = 100.00
Slope (%)= 1.42
N-Value = 0.013
Calculations
Compute by:Known Q
Known Q (cfs) = 0.86
Highlighted
Depth (ft)= 0.33
Q (cfs)= 0.860
Area (sqft)= 0.20
Velocity (ft/s)= 4.29
Wetted Perim (ft) = 1.13
Crit Depth, Yc (ft) = 0.42
Top Width (ft)= 0.81
EGL (ft)= 0.62
0 1
Elev (ft)Section
99.75 100.00
100.25
100.50
100.75
101.00
Reach (ft)10/27/2026 C3 316 of 424
Channel Report
Hydraflow Express Extension for Autodesk® Civil 3D® by Autodesk, Inc.Tuesday, Dec 9 2025 Pipe 2 - 10in Sewer Main (S. Santa Fe)
Circular
Diameter (ft)= 0.83
Invert Elev (ft) = 100.00
Slope (%)= 4.53
N-Value = 0.013
Calculations
Compute by:Known Q
Known Q (cfs) = 0.86
Highlighted
Depth (ft)= 0.25
Q (cfs)= 0.860
Area (sqft)= 0.14
Velocity (ft/s)= 6.22
Wetted Perim (ft) = 0.97
Crit Depth, Yc (ft) = 0.42
Top Width (ft)= 0.76
EGL (ft)= 0.85
0 1
Elev (ft)Section
99.75 100.00
100.25
100.50
100.75
101.00
Reach (ft)10/27/2026 C3 317 of 424
Channel Report
Hydraflow Express Extension for Autodesk® Civil 3D® by Autodesk, Inc.Tuesday, Dec 9 2025 Pipe 3 - 10in Sewer Main (S. Santa Fe)
Circular
Diameter (ft)= 0.83
Invert Elev (ft) = 100.00
Slope (%)= 0.99
N-Value = 0.013
Calculations
Compute by:Known Q
Known Q (cfs) = 0.86
Highlighted
Depth (ft)= 0.37
Q (cfs)= 0.860
Area (sqft)= 0.23
Velocity (ft/s)= 3.67
Wetted Perim (ft) = 1.22
Crit Depth, Yc (ft) = 0.42
Top Width (ft)= 0.83
EGL (ft)= 0.58
0 1
Elev (ft)Section
99.75 100.00
100.25
100.50
100.75
101.00
Reach (ft)10/27/2026 C3 318 of 424
Channel Report
Hydraflow Express Extension for Autodesk® Civil 3D® by Autodesk, Inc.Tuesday, Dec 9 2025 Pipe 4 - 10in Sewer Main (S. Santa Fe)
Circular
Diameter (ft)= 0.83
Invert Elev (ft) = 100.00
Slope (%)= 0.56
N-Value = 0.013
Calculations
Compute by:Known Q
Known Q (cfs) = 0.86
Highlighted
Depth (ft)= 0.43
Q (cfs)= 0.860
Area (sqft)= 0.28
Velocity (ft/s)= 3.03
Wetted Perim (ft) = 1.34
Crit Depth, Yc (ft) = 0.42
Top Width (ft)= 0.83
EGL (ft)= 0.57
0 1
Elev (ft)Section
99.75 100.00
100.25
100.50
100.75
101.00
Reach (ft)10/27/2026 C3 319 of 424
Channel Report
Hydraflow Express Extension for Autodesk® Civil 3D® by Autodesk, Inc.Tuesday, Dec 9 2025 Pipe 5 - 10in Sewer Main (S. Santa Fe)
Circular
Diameter (ft)= 0.83
Invert Elev (ft) = 100.00
Slope (%)= 6.95
N-Value = 0.013
Calculations
Compute by:Known Q
Known Q (cfs) = 0.86
Highlighted
Depth (ft)= 0.22
Q (cfs)= 0.860
Area (sqft)= 0.12
Velocity (ft/s)= 7.43
Wetted Perim (ft) = 0.90
Crit Depth, Yc (ft) = 0.42
Top Width (ft)= 0.73
EGL (ft)= 1.08
0 1
Elev (ft)Section
99.75 100.00
100.25
100.50
100.75
101.00
Reach (ft)10/27/2026 C3 320 of 424
Preliminary Design Report December 2025
S. Santa Fe Sewer Improvement Project (CIP No. 8382)
Appendix 4 – Design Support Reference Material
10/27/2026 C3 321 of 424
1 PVC PRESSURE & SEWER PIPE
207 DURHAM DRIVE, ATHENS, AL 35611
PHONE: 256-233-3520
CO N S O L I DAT E D P I P E .CO M
SECURESEAL™ PVC PIPE
10/27/2026 C3 322 of 424
4 PRESSURE PIPE (WHITE OR BLUE): 2” – 12”
NORMAL SIZE INCHES
MINIMUM WALL THICKNESS
(MINIMUM)
PIPE OUTSIDE DIAMETER
(NOMINAL)
BELL OUTSIDE DIAMETER
(APPROXIMATE)
REFERENCE MARK (AVG.)APPROXIMATE WEIGHT/FOOT
2 .091 2.375 3.100 3.000 .434
2-1/2 .110 2.875 3.875 3.250 .640
3 .135 3.500 4.510 3.500 .947
4 .173 4.500 5.690 4.000 1.564
6 .255 6.625 8.075 5.250 3.412
8 .332 8.625 10.310 5.750 5.801
10 .413 10.750 12.890 6.250 9.023
12 .490 12.750 15.105 6.750 12.737
PR160* (SDR 26) Conforming to ASTM D 2241 and D 3139 ∆=2˚ CELL CL ASSIFIC ATION 12454B
PR200* (SDR21) Conforming to ASTM D 2241 and D 3139 ∆=2˚ CELL CL ASSIFIC ATION 12454B
NORMAL SIZE
INCHES
MINIMUM WALL THICKNESS (MINIMUM)
PIPE OUTSIDE DIAMETER (NOMINAL)
BELL OUTSIDE DIAMETER (APPROXIMATE)
REFERENCE MARK
(AVG.)
APPROXIMATE
WEIGHT/FOOT
2 .113 2.375 3.125 3.000 .533
2-1/2 .137 2.875 3.940 3.250 .789
3 .167 3.500 4.650 3.500 1.162
4 .214 4.500 5.805 4.000 1.920
6 .316 6.625 8.232 5.250 4.195
8 .410 8.625 10.505 5.750 7.124
10 .511 10.750 12.920 6.250 11.080
12 .606 12.750 15.350 6.750 15.637
NORMAL SIZE INCHES
MINIMUM WALL
THICKNESS (MINIMUM)
PIPE OUTSIDE
DIAMETER (NOMINAL)
BELL OUTSIDE
DIAMETER (APPROXIMATE)
REFERENCE MARK (AVG.)APPROXIMATE WEIGHT FOOT
2 .140 2.375 3.370 3.000 .653
2-1/2 .169 2.875 4.157 3.250 .961
3 .206 3.500 40710 3.500 1.412
4 .265 4.500 5.955 4.000 2.347
6 .390 6.625 8.470 5.250 5.117
8 .508 8.625 10.780 5.750 8.685
10 .632 10.750 13.100 6.250 13.535
12 .750 12.750 15.575 6.750 19.110
PR250* (SDR 17) Conforming to ASTM D 2241 and D 3139 ∆=2˚ CELL CL ASSIFIC ATION 12454B
NSF-PW10/27/2026 C3 323 of 424
10/27/2026 C3 324 of 424
United States
Department of
Agriculture
A product of the National
Cooperative Soil Survey,
a joint effort of the United
States Department of
Agriculture and other
Federal agencies, State
agencies including the
Agricultural Experiment
Stations, and local
participants
Custom Soil Resource
Report for
San Diego County
Area, CaliforniaNatural
Resources
Conservation
Service
December 8, 202510/27/2026 C3 325 of 424
Preface
Soil surveys contain information that affects land use planning in survey areas.
They highlight soil limitations that affect various land uses and provide information about the properties of the soils in the survey areas. Soil surveys are designed for many different users, including farmers, ranchers, foresters, agronomists, urban planners, community officials, engineers, developers, builders, and home buyers.
Also, conservationists, teachers, students, and specialists in recreation, waste disposal, and pollution control can use the surveys to help them understand, protect, or enhance the environment.
Various land use regulations of Federal, State, and local governments may impose special restrictions on land use or land treatment. Soil surveys identify soil properties that are used in making various land use or land treatment decisions.
The information is intended to help the land users identify and reduce the effects of soil limitations on various land uses. The landowner or user is responsible for identifying and complying with existing laws and regulations.
Although soil survey information can be used for general farm, local, and wider area planning, onsite investigation is needed to supplement this information in some cases. Examples include soil quality assessments ( http://www.nrcs.usda.gov/wps/ portal/nrcs/main/soils/health/) and certain conservation and engineering applications. For more detailed information, contact your local USDA Service Center ( https://offices.sc.egov.usda.gov/locator/app?agency=nrcs) or your NRCS State Soil Scientist ( http://www.nrcs.usda.gov/wps/portal/nrcs/detail/soils/contactus/ ? cid=nrcs142p2_053951).
Great differences in soil properties can occur within short distances. Some soils are seasonally wet or subject to flooding. Some are too unstable to be used as a foundation for buildings or roads. Clayey or wet soils are poorly suited to use as septic tank absorption fields. A high water table makes a soil poorly suited to basements or underground installations.
The National Cooperative Soil Survey is a joint effort of the United States Department of Agriculture and other Federal agencies, State agencies including the Agricultural Experiment Stations, and local agencies. The Natural Resources Conservation Service (NRCS) has leadership for the Federal part of the National Cooperative Soil Survey.
Information about soils is updated periodically. Updated information is available through the NRCS Web Soil Survey, the site for official soil survey information.
The U.S. Department of Agriculture (USDA) prohibits discrimination in all its programs and activities on the basis of race, color, national origin, age, disability, and where applicable, sex, marital status, familial status, parental status, religion, sexual orientation, genetic information, political beliefs, reprisal, or because all or a part of an individual's income is derived from any public assistance program. (Not all prohibited bases apply to all programs.) Persons with disabilities who require 2 10/27/2026 C3 326 of 424
alternative means for communication of program information (Braille, large print, audiotape, etc.) should contact USDA's TARGET Center at (202) 720-2600 (voice and TDD). To file a complaint of discrimination, write to USDA, Director, Office of Civil Rights, 1400 Independence Avenue, S.W., Washington, D.C. 20250-9410 or call (800) 795-3272 (voice) or (202) 720-6382 (TDD). USDA is an equal opportunity provider and employer.
3 10/27/2026 C3 327 of 424
Contents
Preface....................................................................................................................2 How Soil Surveys Are Made..................................................................................5 Soil Map..................................................................................................................8 Soil Map (S. Santa Fe Sewer)..............................................................................9 Legend................................................................................................................10 Map Unit Legend (S. Santa Fe Sewer)...............................................................11 Map Unit Descriptions (S. Santa Fe Sewer).......................................................11 San Diego County Area, California.................................................................13 BlD2—Bonsall sandy loam, 9 to 15 percent slopes, eroded.......................13 FaE2—Fallbrook sandy loam, 15 to 30 percent slopes, eroded.................14 SbA—Salinas clay loam, 0 to 2 percent slopes, warm MAAT, MLRA 19....15 VsE2—Vista coarse sandy loam, 15 to 30 percent slopes, eroded............17 References............................................................................................................19 4 10/27/2026 C3 328 of 424
How Soil Surveys Are Made
Soil surveys are made to provide information about the soils and miscellaneous areas in a specific area. They include a description of the soils and miscellaneous areas and their location on the landscape and tables that show soil properties and limitations affecting various uses. Soil scientists observed the steepness, length, and shape of the slopes; the general pattern of drainage; the kinds of crops and native plants; and the kinds of bedrock. They observed and described many soil profiles. A soil profile is the sequence of natural layers, or horizons, in a soil. The profile extends from the surface down into the unconsolidated material in which the soil formed or from the surface down to bedrock. The unconsolidated material is devoid of roots and other living organisms and has not been changed by other biological activity.
Currently, soils are mapped according to the boundaries of major land resource areas (MLRAs). MLRAs are geographically associated land resource units that share common characteristics related to physiography, geology, climate, water resources, soils, biological resources, and land uses (USDA, 2006). Soil survey areas typically consist of parts of one or more MLRA.
The soils and miscellaneous areas in a survey area occur in an orderly pattern that is related to the geology, landforms, relief, climate, and natural vegetation of the area. Each kind of soil and miscellaneous area is associated with a particular kind of landform or with a segment of the landform. By observing the soils and miscellaneous areas in the survey area and relating their position to specific segments of the landform, a soil scientist develops a concept, or model, of how they were formed. Thus, during mapping, this model enables the soil scientist to predict with a considerable degree of accuracy the kind of soil or miscellaneous area at a specific location on the landscape.
Commonly, individual soils on the landscape merge into one another as their characteristics gradually change. To construct an accurate soil map, however, soil scientists must determine the boundaries between the soils. They can observe only a limited number of soil profiles. Nevertheless, these observations, supplemented by an understanding of the soil-vegetation-landscape relationship, are sufficient to verify predictions of the kinds of soil in an area and to determine the boundaries.
Soil scientists recorded the characteristics of the soil profiles that they studied. They noted soil color, texture, size and shape of soil aggregates, kind and amount of rock fragments, distribution of plant roots, reaction, and other features that enable them to identify soils. After describing the soils in the survey area and determining their properties, the soil scientists assigned the soils to taxonomic classes (units).
Taxonomic classes are concepts. Each taxonomic class has a set of soil characteristics with precisely defined limits. The classes are used as a basis for comparison to classify soils systematically. Soil taxonomy, the system of taxonomic classification used in the United States, is based mainly on the kind and character of soil properties and the arrangement of horizons within the profile. After the soil 5 10/27/2026 C3 329 of 424
scientists classified and named the soils in the survey area, they compared the individual soils with similar soils in the same taxonomic class in other areas so that they could confirm data and assemble additional data based on experience and research.
The objective of soil mapping is not to delineate pure map unit components; the objective is to separate the landscape into landforms or landform segments that have similar use and management requirements. Each map unit is defined by a unique combination of soil components and/or miscellaneous areas in predictable proportions. Some components may be highly contrasting to the other components of the map unit. The presence of minor components in a map unit in no way diminishes the usefulness or accuracy of the data. The delineation of such landforms and landform segments on the map provides sufficient information for the development of resource plans. If intensive use of small areas is planned, onsite investigation is needed to define and locate the soils and miscellaneous areas.
Soil scientists make many field observations in the process of producing a soil map.
The frequency of observation is dependent upon several factors, including scale of mapping, intensity of mapping, design of map units, complexity of the landscape, and experience of the soil scientist. Observations are made to test and refine the soil-landscape model and predictions and to verify the classification of the soils at specific locations. Once the soil-landscape model is refined, a significantly smaller number of measurements of individual soil properties are made and recorded.
These measurements may include field measurements, such as those for color, depth to bedrock, and texture, and laboratory measurements, such as those for content of sand, silt, clay, salt, and other components. Properties of each soil typically vary from one point to another across the landscape.
Observations for map unit components are aggregated to develop ranges of characteristics for the components. The aggregated values are presented. Direct measurements do not exist for every property presented for every map unit component. Values for some properties are estimated from combinations of other properties.
While a soil survey is in progress, samples of some of the soils in the area generally are collected for laboratory analyses and for engineering tests. Soil scientists interpret the data from these analyses and tests as well as the field-observed characteristics and the soil properties to determine the expected behavior of the soils under different uses. Interpretations for all of the soils are field tested through observation of the soils in different uses and under different levels of management.
Some interpretations are modified to fit local conditions, and some new interpretations are developed to meet local needs. Data are assembled from other sources, such as research information, production records, and field experience of specialists. For example, data on crop yields under defined levels of management are assembled from farm records and from field or plot experiments on the same kinds of soil.
Predictions about soil behavior are based not only on soil properties but also on such variables as climate and biological activity. Soil conditions are predictable over long periods of time, but they are not predictable from year to year. For example, soil scientists can predict with a fairly high degree of accuracy that a given soil will have a high water table within certain depths in most years, but they cannot predict that a high water table will always be at a specific level in the soil on a specific date.
After soil scientists located and identified the significant natural bodies of soil in the survey area, they drew the boundaries of these bodies on aerial photographs and Custom Soil Resource Report
6 10/27/2026 C3 330 of 424
identified each as a specific map unit. Aerial photographs show trees, buildings, fields, roads, and rivers, all of which help in locating boundaries accurately.
Custom Soil Resource Report
7 10/27/2026 C3 331 of 424
Soil Map
The soil map section includes the soil map for the defined area of interest, a list of soil map units on the map and extent of each map unit, and cartographic symbols displayed on the map. Also presented are various metadata about data used to produce the map, and a description of each soil map unit. 8 10/27/2026 C3 332 of 424
9 Custom Soil Resource Report
Soil Map (S. Santa Fe Sewer)
367
2 3
0 0
367
2 3
4 0
367
2 3
8 0
367
2 4
2 0
367
2 4
6 0
367
2 5
0 0
367
2 5
4 0
367
2 5
8 0
367
2 6
2 0
367
2 3
0 0
367
2 3
4 0
367
2 3
8 0
367
2 4
2 0
367
2 4
6 0
367
2 5
0 0
367
2 5
4 0
367
2 5
8 0
367
2 6
2 0
478640 478680 478720 478760 478800 478840 478880
478640 478680 478720 478760 478800 478840 478880
33° 11' 32'' N
117
°
1 3
'
4 5
'
'
W
33° 11' 32'' N
117
°
1 3
'
3 5
'
'
W
33° 11' 20'' N
11 7
°
1 3
'
4 5
'
'
W
33° 11' 20'' N
11 7
°
1 3
'
3 5
'
'
W
N
Map projection: Web Mercator Corner coordinates: WGS84 Edge tics: UTM Zone 11N WGS84 0 50 100 200 300
Feet
0 25 50 100 150
Meters
Map Scale: 1:1,760 if printed on A portrait (8.5" x 11") sheet.
Soil Map may not be valid at this scale.
10/27/2026 C3 333 of 424
MAP LEGEND MAP INFORMATION
Area of Interest (AOI)
Area of Interest (AOI)
Soils
Soil Map Unit Polygons
Soil Map Unit Lines
Soil Map Unit Points
Special Point Features
Blowout
Borrow Pit
Clay Spot
Closed Depression
Gravel Pit
Gravelly Spot
Landfill
Lava Flow
Marsh or swamp
Mine or Quarry
Miscellaneous Water
Perennial Water
Rock Outcrop
Saline Spot
Sandy Spot
Severely Eroded Spot
Sinkhole
Slide or Slip
Sodic Spot
Spoil Area
Stony Spot
Very Stony Spot
Wet Spot
Other
Special Line Features
Water Features
Streams and Canals
Transportation
Rails
Interstate Highways
US Routes
Major Roads
Local Roads
Background
Aerial Photography
The soil surveys that comprise your AOI were mapped at
1:24,000.
Warning: Soil Map may not be valid at this scale.
Enlargement of maps beyond the scale of mapping can cause misunderstanding of the detail of mapping and accuracy of soil line placement. The maps do not show the small areas of contrasting soils that could have been shown at a more detailed scale.
Please rely on the bar scale on each map sheet for map
measurements.
Source of Map: Natural Resources Conservation Service
Web Soil Survey URL:
Coordinate System: Web Mercator (EPSG:3857)
Maps from the Web Soil Survey are based on the Web Mercator projection, which preserves direction and shape but distorts distance and area. A projection that preserves area, such as the Albers equal-area conic projection, should be used if more accurate calculations of distance or area are required.
This product is generated from the USDA-NRCS certified data as of the version date(s) listed below.
Soil Survey Area: San Diego County Area, California
Survey Area Data: Version 21, Sep 8, 2025
Soil map units are labeled (as space allows) for map scales 1:50,000 or larger.
Date(s) aerial images were photographed: Mar 14, 2022—Mar 17, 2022
The orthophoto or other base map on which the soil lines were compiled and digitized probably differs from the background imagery displayed on these maps. As a result, some minor shifting of map unit boundaries may be evident.
Custom Soil Resource Report
10 10/27/2026 C3 334 of 424
Map Unit Legend (S. Santa Fe Sewer)
Map Unit Symbol Map Unit Name Acres in AOI Percent of AOI BlD2 Bonsall sandy loam, 9 to 15
percent slopes, eroded
0.3 9.7%
FaE2 Fallbrook sandy loam, 15 to 30
percent slopes, eroded
0.5 13.9%
SbA Salinas clay loam, 0 to 2
percent slopes, warm MAAT,
MLRA 19
2.5 75.6%
VsE2 Vista coarse sandy loam, 15 to
30 percent slopes, eroded
0.0 0.9%
Totals for Area of Interest 3.3 100.0%
Map Unit Descriptions (S. Santa Fe Sewer)
The map units delineated on the detailed soil maps in a soil survey represent the soils or miscellaneous areas in the survey area. The map unit descriptions, along with the maps, can be used to determine the composition and properties of a unit.
A map unit delineation on a soil map represents an area dominated by one or more major kinds of soil or miscellaneous areas. A map unit is identified and named according to the taxonomic classification of the dominant soils. Within a taxonomic class there are precisely defined limits for the properties of the soils. On the landscape, however, the soils are natural phenomena, and they have the characteristic variability of all natural phenomena. Thus, the range of some observed properties may extend beyond the limits defined for a taxonomic class.
Areas of soils of a single taxonomic class rarely, if ever, can be mapped without including areas of other taxonomic classes. Consequently, every map unit is made up of the soils or miscellaneous areas for which it is named and some minor components that belong to taxonomic classes other than those of the major soils.
Most minor soils have properties similar to those of the dominant soil or soils in the map unit, and thus they do not affect use and management. These are called noncontrasting, or similar, components. They may or may not be mentioned in a particular map unit description. Other minor components, however, have properties and behavioral characteristics divergent enough to affect use or to require different management. These are called contrasting, or dissimilar, components. They generally are in small areas and could not be mapped separately because of the scale used. Some small areas of strongly contrasting soils or miscellaneous areas are identified by a special symbol on the maps. If included in the database for a given area, the contrasting minor components are identified in the map unit descriptions along with some characteristics of each. A few areas of minor components may not have been observed, and consequently they are not mentioned in the descriptions, especially where the pattern was so complex that it was impractical to make enough observations to identify all the soils and miscellaneous areas on the landscape.
Custom Soil Resource Report
11 10/27/2026 C3 335 of 424
The presence of minor components in a map unit in no way diminishes the usefulness or accuracy of the data. The objective of mapping is not to delineate pure taxonomic classes but rather to separate the landscape into landforms or landform segments that have similar use and management requirements. The delineation of such segments on the map provides sufficient information for the development of resource plans. If intensive use of small areas is planned, however, onsite investigation is needed to define and locate the soils and miscellaneous areas.
An identifying symbol precedes the map unit name in the map unit descriptions.
Each description includes general facts about the unit and gives important soil properties and qualities.
Soils that have profiles that are almost alike make up a soil series. Except for differences in texture of the surface layer, all the soils of a series have major horizons that are similar in composition, thickness, and arrangement.
Soils of one series can differ in texture of the surface layer, slope, stoniness, salinity, degree of erosion, and other characteristics that affect their use. On the basis of such differences, a soil series is divided into soil phases. Most of the areas shown on the detailed soil maps are phases of soil series. The name of a soil phase commonly indicates a feature that affects use or management. For example, Alpha silt loam, 0 to 2 percent slopes, is a phase of the Alpha series.
Some map units are made up of two or more major soils or miscellaneous areas.
These map units are complexes, associations, or undifferentiated groups.
A complex consists of two or more soils or miscellaneous areas in such an intricate pattern or in such small areas that they cannot be shown separately on the maps.
The pattern and proportion of the soils or miscellaneous areas are somewhat similar in all areas. Alpha-Beta complex, 0 to 6 percent slopes, is an example.
An association is made up of two or more geographically associated soils or miscellaneous areas that are shown as one unit on the maps. Because of present or anticipated uses of the map units in the survey area, it was not considered practical or necessary to map the soils or miscellaneous areas separately. The pattern and relative proportion of the soils or miscellaneous areas are somewhat similar. Alpha-Beta association, 0 to 2 percent slopes, is an example.
An undifferentiated group is made up of two or more soils or miscellaneous areas that could be mapped individually but are mapped as one unit because similar interpretations can be made for use and management. The pattern and proportion of the soils or miscellaneous areas in a mapped area are not uniform. An area can be made up of only one of the major soils or miscellaneous areas, or it can be made up of all of them. Alpha and Beta soils, 0 to 2 percent slopes, is an example.
Some surveys include miscellaneous areas. Such areas have little or no soil material and support little or no vegetation. Rock outcrop is an example.
Custom Soil Resource Report
12 10/27/2026 C3 336 of 424
San Diego County Area, California
BlD2—Bonsall sandy loam, 9 to 15 percent slopes, eroded Map Unit Setting
National map unit symbol: hb8n
Elevation: 200 to 2,500 feet
Mean annual precipitation: 14 inches
Mean annual air temperature: 63 degrees F
Frost-free period: 240 to 340 days
Farmland classification: Farmland of statewide importance Map Unit Composition
Bonsall and similar soils:85 percent
Minor components:15 percent
Estimates are based on observations, descriptions, and transects of the mapunit.
Description of Bonsall
Setting
Landform:Hillslopes
Landform position (two-dimensional):Backslope
Landform position (three-dimensional):Side slope
Down-slope shape:Convex
Across-slope shape:Convex
Parent material:Weathered granite
Typical profile
H1 - 0 to 8 inches: sandy loam
H2 - 8 to 24 inches: clay
H3 - 24 to 33 inches: clay
H4 - 33 to 44 inches: sandy clay loam
H5 - 44 to 60 inches: sandy loam
Properties and qualities
Slope:9 to 15 percent
Depth to restrictive feature:More than 80 inches
Drainage class:Moderately well drained
Runoff class: Very high
Capacity of the most limiting layer to transmit water (Ksat):Very low to moderately low (0.00 to 0.06 in/hr)
Depth to water table:More than 80 inches
Frequency of flooding:None
Frequency of ponding:None
Calcium carbonate, maximum content:5 percent
Maximum salinity:Slightly saline to moderately saline (4.0 to 8.0 mmhos/cm) Sodium adsorption ratio, maximum:15.0
Available water supply, 0 to 60 inches: Very low (about 0.9 inches) Interpretive groups
Land capability classification (irrigated): 4e
Land capability classification (nonirrigated): 4e
Hydrologic Soil Group: D
Ecological site: R019XD061CA - CLAYPAN
Hydric soil rating: No
Custom Soil Resource Report
13 10/27/2026 C3 337 of 424
Minor Components
Placentia
Percent of map unit:5 percent
Hydric soil rating: No
Fallbrook
Percent of map unit:5 percent
Hydric soil rating: No
Bosanko
Percent of map unit:5 percent
Hydric soil rating: No
FaE2—Fallbrook sandy loam, 15 to 30 percent slopes, eroded Map Unit Setting
National map unit symbol: hbbw
Elevation: 300 to 2,000 feet
Mean annual precipitation: 12 to 25 inches
Mean annual air temperature: 59 to 64 degrees F
Frost-free period: 250 to 320 days
Farmland classification: Not prime farmland
Map Unit Composition
Fallbrook and similar soils:85 percent
Minor components:15 percent
Estimates are based on observations, descriptions, and transects of the mapunit.
Description of Fallbrook
Setting
Landform:Hills
Landform position (two-dimensional):Backslope
Landform position (three-dimensional):Side slope
Down-slope shape:Convex
Across-slope shape:Convex
Parent material:Residuum weathered from granodiorite
Typical profile
H1 - 0 to 2 inches: sandy loam
H2 - 2 to 24 inches: sandy clay loam
H3 - 24 to 28 inches: sandy loam
H4 - 28 to 32 inches: weathered bedrock
Properties and qualities
Slope:15 to 30 percent
Depth to restrictive feature:20 to 40 inches to paralithic bedrock Drainage class:Well drained
Runoff class: High
Custom Soil Resource Report
14 10/27/2026 C3 338 of 424
Capacity of the most limiting layer to transmit water (Ksat):Moderately high to high (0.57 to 1.98 in/hr)
Depth to water table:More than 80 inches
Frequency of flooding:None
Frequency of ponding:None
Available water supply, 0 to 60 inches: Low (about 4.2 inches) Interpretive groups
Land capability classification (irrigated): 6e
Land capability classification (nonirrigated): 6e
Hydrologic Soil Group: C
Ecological site: R019XD029CA - LOAMY
Hydric soil rating: No
Minor Components
Vista
Percent of map unit:10 percent
Hydric soil rating: No
Cieneba
Percent of map unit:2 percent
Hydric soil rating: No
Bonsall
Percent of map unit:2 percent
Hydric soil rating: No
Las posas
Percent of map unit:1 percent
Hydric soil rating: No
SbA—Salinas clay loam, 0 to 2 percent slopes, warm MAAT, MLRA 19 Map Unit Setting
National map unit symbol: 2tyy2
Elevation: 0 to 900 feet
Mean annual precipitation: 10 to 18 inches
Mean annual air temperature: 61 to 64 degrees F
Frost-free period: 330 to 360 days
Farmland classification: Prime farmland if irrigated
Map Unit Composition
Salinas and similar soils:85 percent
Minor components:15 percent
Estimates are based on observations, descriptions, and transects of the mapunit.
Description of Salinas
Setting
Landform:Alluvial fans
Landform position (two-dimensional):Toeslope
Custom Soil Resource Report
15 10/27/2026 C3 339 of 424
Landform position (three-dimensional):Base slope, rise
Down-slope shape:Linear
Across-slope shape:Convex
Parent material:Alluvium derived from sedimentary rock
Typical profile
Ap - 0 to 7 inches: clay loam
A - 7 to 22 inches: clay loam
C1 - 22 to 32 inches: clay loam
C2 - 32 to 46 inches: clay loam
2Ck1 - 46 to 55 inches: clay loam
2Ck2 - 55 to 64 inches: loam
Properties and qualities
Slope:0 to 2 percent
Depth to restrictive feature:More than 80 inches
Drainage class:Well drained
Runoff class: Very low
Capacity of the most limiting layer to transmit water (Ksat):Very low to moderately low (0.00 to 0.14 in/hr)
Depth to water table:More than 80 inches
Frequency of flooding:None
Frequency of ponding:None
Calcium carbonate, maximum content:10 percent
Maximum salinity:Nonsaline to very slightly saline (0.0 to 2.0 mmhos/cm) Available water supply, 0 to 60 inches: High (about 10.4 inches) Interpretive groups
Land capability classification (irrigated): 1
Land capability classification (nonirrigated): 3c
Hydrologic Soil Group: C
Ecological site: R019XG911CA - Loamy Fan
Hydric soil rating: No
Minor Components
Diablo
Percent of map unit:3 percent
Hydric soil rating: No
Huerhuero
Percent of map unit:3 percent
Hydric soil rating: No
Tujunga
Percent of map unit:3 percent
Hydric soil rating: No
Cropley
Percent of map unit:2 percent
Hydric soil rating: No
Garretson
Percent of map unit:1 percent
Hydric soil rating: No
Pacheco
Percent of map unit:1 percent
Hydric soil rating: No
Custom Soil Resource Report
16 10/27/2026 C3 340 of 424
Mocho
Percent of map unit:1 percent
Hydric soil rating: No
Sorrento
Percent of map unit:1 percent
Hydric soil rating: No
VsE2—Vista coarse sandy loam, 15 to 30 percent slopes, eroded Map Unit Setting
National map unit symbol: hbhd
Elevation: 400 to 3,900 feet
Mean annual precipitation: 10 to 18 inches
Mean annual air temperature: 59 to 64 degrees F
Frost-free period: 210 to 300 days
Farmland classification: Not prime farmland
Map Unit Composition
Vista and similar soils:85 percent
Minor components:15 percent
Estimates are based on observations, descriptions, and transects of the mapunit.
Description of Vista
Setting
Landform:Hills
Landform position (two-dimensional):Backslope
Landform position (three-dimensional):Side slope
Down-slope shape:Convex
Across-slope shape:Convex
Parent material:Residuum weathered from granodiorite and quartz-diorite Typical profile
H1 - 0 to 15 inches: coarse sandy loam
H2 - 15 to 30 inches: sandy loam
H3 - 30 to 34 inches: weathered bedrock
Properties and qualities
Slope:15 to 30 percent
Depth to restrictive feature:20 to 40 inches to paralithic bedrock Drainage class:Well drained
Runoff class: Medium
Capacity of the most limiting layer to transmit water (Ksat):High (1.98 to 5.95 in/hr)
Depth to water table:More than 80 inches
Frequency of flooding:None
Frequency of ponding:None
Available water supply, 0 to 60 inches: Low (about 3.3 inches) Custom Soil Resource Report
17 10/27/2026 C3 341 of 424
Interpretive groups
Land capability classification (irrigated): 6e
Land capability classification (nonirrigated): 6e
Hydrologic Soil Group: B
Ecological site: R019XD029CA - LOAMY
Hydric soil rating: No
Minor Components
Fallbrook
Percent of map unit:10 percent
Hydric soil rating: No
Cieneba
Percent of map unit:5 percent
Hydric soil rating: No
Custom Soil Resource Report
18 10/27/2026 C3 342 of 424
References
American Association of State Highway and Transportation Officials (AASHTO). 2004. Standard specifications for transportation materials and methods of sampling and testing. 24th edition.
American Society for Testing and Materials (ASTM). 2005. Standard classification of soils for engineering purposes. ASTM Standard D2487-00.
Cowardin, L.M., V. Carter, F.C. Golet, and E.T. LaRoe. 1979. Classification of wetlands and deep-water habitats of the United States. U.S. Fish and Wildlife Service FWS/OBS-79/31.
Federal Register. July 13, 1994. Changes in hydric soils of the United States.
Federal Register. September 18, 2002. Hydric soils of the United States.
Hurt, G.W., and L.M. Vasilas, editors. Version 6.0, 2006. Field indicators of hydric soils in the United States.
National Research Council. 1995. Wetlands: Characteristics and boundaries.
Soil Survey Division Staff. 1993. Soil survey manual. Soil Conservation Service.
U.S. Department of Agriculture Handbook 18. http://www.nrcs.usda.gov/wps/portal/ nrcs/detail/national/soils/?cid=nrcs142p2_054262
Soil Survey Staff. 1999. Soil taxonomy: A basic system of soil classification for making and interpreting soil surveys. 2nd edition. Natural Resources Conservation Service, U.S. Department of Agriculture Handbook 436. http:// www.nrcs.usda.gov/wps/portal/nrcs/detail/national/soils/?cid=nrcs142p2_053577 Soil Survey Staff. 2010. Keys to soil taxonomy. 11th edition. U.S. Department of Agriculture, Natural Resources Conservation Service. http:// www.nrcs.usda.gov/wps/portal/nrcs/detail/national/soils/?cid=nrcs142p2_053580 Tiner, R.W., Jr. 1985. Wetlands of Delaware. U.S. Fish and Wildlife Service and Delaware Department of Natural Resources and Environmental Control, Wetlands Section.
United States Army Corps of Engineers, Environmental Laboratory. 1987. Corps of Engineers wetlands delineation manual. Waterways Experiment Station Technical Report Y-87-1.
United States Department of Agriculture, Natural Resources Conservation Service.
National forestry manual. http://www.nrcs.usda.gov/wps/portal/nrcs/detail/soils/ home/?cid=nrcs142p2_053374
United States Department of Agriculture, Natural Resources Conservation Service.
National range and pasture handbook. http://www.nrcs.usda.gov/wps/portal/nrcs/ detail/national/landuse/rangepasture/?cid=stelprdb1043084 19 10/27/2026 C3 343 of 424
United States Department of Agriculture, Natural Resources Conservation Service.
National soil survey handbook, title 430-VI. http://www.nrcs.usda.gov/wps/portal/ nrcs/detail/soils/scientists/?cid=nrcs142p2_054242
United States Department of Agriculture, Natural Resources Conservation Service. 2006. Land resource regions and major land resource areas of the United States, the Caribbean, and the Pacific Basin. U.S. Department of Agriculture Handbook 296. http://www.nrcs.usda.gov/wps/portal/nrcs/detail/national/soils/ ? cid=nrcs142p2_053624
United States Department of Agriculture, Soil Conservation Service. 1961. Land capability classification. U.S. Department of Agriculture Handbook 210. http:// www.nrcs.usda.gov/Internet/FSE_DOCUMENTS/nrcs142p2_052290.pdf Custom Soil Resource Report
20 10/27/2026 C3 344 of 424
Preliminary Design Report December 2025
S. Santa Fe Sewer Improvement Project (CIP No. 8382)
Appendix 5 – As-Builts
10/27/2026 C3 345 of 424
10/27/2026 C3 346 of 424
10/27/2026 C3 347 of 424
10/27/2026 C3 348 of 424
10/27/2026 C3 349 of 424
10/27/2026 C3 350 of 424
10/27/2026 C3 351 of 424
10/27/2026 C3 352 of 424
GENERAL NOTES IMPR 0 VEMENT PLANS FOR: LEGEND
1. A CONSTRUCTION PERMIT IS REQUIRED FOR ALL CONTRACTORS PERFORMING ANY OF THE COV CITY OF VISTA S7D. DRAWING WORK SHOWN ON THIS PLAN. THE PERMIT CAN BE OBTAINED AT THE CITY OF VID - VISTA IRRIGA 77ON DISTRICT STD. DRAWING:
DEVELOPMENT SERVICES CENTER, 200 CIVIC CENTER DRIVE, VISTA, CA. 92084 -6275 A SDRSD SAN DIEGO REGIONAL STD. DRAWING PERMIT WILL BE ISSUED ONLY TO THE CONTRACTOR WHO IS TO PERFORM THE WORK.
THE PERMJTEE SHALL GIVE N077CE TO THE CITY OF VISTA ENGINEERING INSPECTION DESCRIPTION STANDARD SYMBOL DEPARTMENT FOR A PRECONSTRUC710N CONFERENCE AT LEAST 48 HOURS PRIOR TO COMMENCING THE WORK. ANY WORK DONE WITHOUT PROPER INSPEC77ON WILL BE SUBJECT TO REJECTION. PHONE: (760)639 -6113 FOR INSPEC770N. PROPERTY LINE EXIS77NG LOT LINE
2. THE CONTRACTOR SHALL BE RESPONSIBLE FOR 7HE LOCA77ON AND PR07EC77ON OF ALL YMAP SHEEN' INDEX: U71LI71ES. FOR LOCA77ON OF UNDERGROUND U77U7IES, OR FOR EMERGENCY ASSISTANCE E = xa r EXISTING WATERLINE W CALL:
1 , k
1 - m .r EXIS77NG ELECTRIC E
SEE SHEET 3 1 TITLE sHET? - 18 SEWER IAIPIQOYEM'lYTs - L /NE c P, VrA ,olv UNDERGROUND SERVICE ALERT 800 422 -4133 }
ya "
2 NOTES 1P SEW IMPROVEMENTS L I YE C - P,[A VISTA ,?NF -; ;' 6 STORM _ DRAIN p
y
4 UNDERGROUND SERVICE ALERT SDG &E 800 227 2600' 3 INDEX MAP 2D SrWkR* IMPROViMFNT,S L7N C & E - AI.A VISTAP PRIME & NAT'A,C WAY a „ SAN DIEGO GAS & ELECTRIC EMERGENCY 800 411 7343 8 STORM DRAINItERM4 .DETAILS 2 SEWER / PRaVE IENTS - t /Nf D - ME'RCAN7YC • STREETPY611P unACIFICBELLTELEPHONECO. (EMERGENCY) DIAL -aSEWIP0 _ - _ -- 6.,@. 5 STORM DRAIN IMPROVEMENTS LINE B & B-1 22 ER M R VEMCNTS L I lf F ` -RCN T 3 j Y = ' r -: i ; : . _ SUBDRA/NVISTAJRRIGA7INDISTRICT (EN G. DEPT 760 597 -3116 /N 0 S Rol" O D C G 6 STORM DRAIN IMPROVEMENTS LINE C C -1 & C -2 23 EROSION AND SF01MENTARON ON - : . 4: . lvor s Er rs _. . VISTA IRRIGATION DISTRICT (EMERGENCY) (760) 597 -3131 _ f SEWER MANHOLE 4 0 / Y 760 599 -6063 7 STORM DRAIN IMPROVEMENTS UNE C Z ER SON AND `SEDIMINTATROM CONTROL RAN a; { ° . 1 n COX CABLE (EMERGENCY) C ) 5_ p F
171
ADELPHIA COMMUNICA 77ONS EMERGENCY 760 438 - 7741 8 STORM DRAIN IMPROVEMENTS, LINE C, C -3 & D ?5 PHgSE 1 - CONSTRUC710N PAY z ..( 8 SEWER MAINEMERGENCY) ( ) rt C.l1Y OF V? TA MAIN NUMBER 760 726 -1340 - _ yx :a AS ( ) ( ) 9 STORM DRAIN IMPROVEMENTS, LINE E, E 1 & E 2 ; ; _ _ . µ .. :> _ r.. a ,.. CITY OF VISTA ENG. DEPT. DIRECT LINE 760 639-6111 1O SEWERMAIN10STORMDRAINIMPROVEMENTSLINEFGHdoJ tea_ CITY OF VISTA AFTER HOURS EMERGENCY DISPATCH FOR SEWER IMPROVEMENTS UNE K L & M 11 STORM DRAIN /MPR 1 CA TCHBASINSPILLSORSTORMDRAINCONTAMINATIONCALLRHO. FIRE DISPATCH ` ° - } - EMERGENCY) (858) 756 -3006 12 STORM DRAIN IMPROVEMENTS LINE A N -1 & V } 4. f; . 4- ',..., 13 STORM DRAIN IMPROVEMENTS UNE 0y r CA TCH
BASIN J. ALL WORK SHALL BE DONE IN ACCORDANCE WI7H THESE PLANS THE STANDARD - - 14 STORM DRAIN .IMPROVEMENTS LIVE 0 1, 0 2, 0 3 & U CURBINLETSPECIFICA770NSFORPUBLICWORKSCONSTRUCTION, AND THE SAN DIEGO SPECIAL _ 15 STORM DRAIN IMPROVEMENTS LINE 0 3, P, Q, R, S, & T _ SUPPLEMENT TO 7HE STANDARD SPECIf7CAT10NS FOR PUBLIC WORKS CONSTRUCTION, AS LAST AMENDED. 16 GRADING PLAN ,,- -# a 7 PCC
SWALE 17 SEWER
IMPROVEMENTS 4. THE STRUCTURAL SEC71ON OF THE STREETS SHALL BE DESIGNED BASED ON R VALUES ry "= rt - a. RUR,r¢ FINISHED GROUND CONTOUR
440 OF SOILS AND ON A T.J. OF 6. MINIMUM SEC77ON SHALL BE 4' A.C. ON 8' CLASS 2 f
i x.ri , BASE. STRUCTURAL SECTIONS DESIGN SHALL BE APPROVED BY THE CITY ENGINEER - EXISTING GROUND CONTOUR PRIOR TO CONSTRUCTION. ALL DR/ VE'WA Y APRONS, CURB & GUTTER, AND SIDEWALKS L Q PROPOSED CUT FILL SLOPE 2. I WI7H AN R VALUE LESS THAN 25 MUST HAVE MINIMUM OF 6 D.G. OR EQUAL. _ VID
NOTES ' 5. ,AS -BULL r DRAWING(S) HALL BE SUBMITTED BY THE ENGINEER OF WORK AND may` _. .. I N 1 T 400.
50TW
L• FUTURE SPOTELEVATIONSAPPROVEDBYTHECITYENGINEERPRIORTOTHEACCEPTANCEOFTHEIMPROVEMENTS. 4. 400. 007F SEPARATE "AS- BUILT' DRAWINGS SHALL BE SUBMITTED' FOR 7HE STREET UGH71NG 1. THE DISTRICT'S APPROVAL GIVEN HERE IS NOT AN APPROVAL TO BEGIN THE INSTALLATION OR CONSTRUCRONOF O SYSTEM. WATER FACIL171ES, APPROVAL FOR THE INSTALLATION OR CONSTRUCTION OF THE WATER FACILITIES IS ONLY GIVEN CONS7RUC110N CONTRACT AND PAYMENT OF
ALL SOLDIER PILE •WALL. (BY SEPARATE
PERMIT) AFTER PROPER APPLICATION AND /OR EXECU71ON OF A TOPOG]UPII Y SOURCE 6. STREET TREES IN NEW DEVELOPMENTS ARE TO BE PLANTED AT A MINIMUM OF EVERY APPLICATIONS AND OR THE CONSTRUCTIONCONTRACTAPPLICABLEFEESTOTHEDIS1RlCT. TO BE ACCEPTED THE ,` . . FORTY FEET OR ONE (1) TREE PER LOT WHICH EVER IS GREATER. MUST BE SIGNED BY THE GENERAL MANAGER. TOMLL SURVEYING. MAPPING & GJS SERVICES RETAINING WALL (BY SEPARATE PERMIT) 8799 BALBOA AVENUE SUITE140ZPRIORTOCONSTRUC710NOFSTREETLIGHTSAPLANON24x36SHEETSAPPROVED2. ANY WATER FACILITIES THAT WILL BE UNDER THE JURISDICTION OF THE DISTRICT SHALL BE CONSTRUCTED IN yY, eSr , C O.T STREETINDEX EXISTING RETAINING WALL ( REMOVE} BY SAN DIEGO GAS & ELECTRIC SHOWING EXACT PLACEMENT OF ALL STREET LIGHTS, ACCORDANCE WMTH THE PLANS SIGNED BY THE DISTRICT AND W1TH 7HE DISTRICT'S STANDARD CONSTRUCTION SAN DIEGO, CA., 92123 - 1562 PULL BOXES, SIZE AND LOCA77ON OF CONDUITS AND SOURCES OF POWER SHALL BE SPECIFICATIONS APPROVED BY THE BOARD OF DIRECTORS ON JANUARY 5, 2000. THE SIGNED ORIGINAL PLANS TELEPHONE. 858 384 -0088 1 -SOU7H SANTA FE AVENUE EXIS11FENCESUBMITTEDTOTHECITYENGINEER. ON FILE AT 7HE DISTRICT OFFICE ARE THE ONLY PLANS RECOGNIZED BY THE DISTRICT AS APPROVED. A NG E E ( REMOVE) FLOWN. OCTOBER 23,
2006 SIGNED SET OF PLANS AND A COPY OF THE SPECIFICATION MANUAL MUST BE ON THE JOB SITE DURING 2 -CIVIC CENTER DRIVE CONSTRUC710N OR INSPECTION OF WATER FACILITIES MAY NOT BE RENDERED. ESCONDIDO AVENUE CHAIN LINK FENCE SPECIAL NOTES 3- TERRACE
DRIVE J. PROPOSED CHANGE'S TO THE 'APPROVED" PLANS MUST BE REVIEWED AND SIGNED BY THE DISTRICT PRIOR TO DRAINAGE STUD 4- MERCANTILE STREET FINISH SURFACEFS1. THE FOLLOWING NOTES ARE PROVIDED TO GIVE INSTRUC770NS TO THE CONTRACTOR BY THE INSTALLATION OF SUCH CHANGES AND SHALL BE INCORPORATED INTO THE ORIGINAL PLANS. THE OWNER, 5- R /NCON STREET . HIS ENGINEER OR HIS CONTRACTOR SHALL NOTIFY THE DISTRICT °S ENGINEERING DEPARTMENT OF ANY TOP OFFOOTINGTHEENGINEEROFWORK. 7HE CITY ENGINEERS SIGNATURE ON THESE PLANS DOES NOT PREPARED BY. TORY WALKER ENGINEERING, INC.
TF DISCREPANCIES BETWEEN THE APPROVED PLANS AND ACTUAL FIELD CONDITIONS. DATED: APRIL 2010 6 -PALA VISTADRIVECONSI7TIJ7FAPPROVALOFANYOFTHESENO7FS, AND THE CITY WILL NOT BE TOP. OF WALL " RESPONSIBLE FOR 7HEIR ENFORCEMENT. 7- POSTAL WAY TW 4. THE CONTRACTOR SHALL OBTAIN THE DISTRICTS APPROVAL FOR THE INSTALLATION OF ANY OTHER U77UTY TO 8 -SANTA PLACE FLOW LINE FL BE INSTALLED THIN ANY /STRICT EASEMENT. THE APPROVAL MUST BE OBTAINED PRIOR TO INSTALLATIONAND2. NE177 JER THE .OWNER NOR THE ENGINEER OF WORK WILL ENFORCE SAFETY MEASURES WI D 9 -SANTA ANI TA DRIVE DIRECTION OFDRAINAGE -. OR REGULA77ONS. THE CONTRACTOR SHALL DESIGN, CONSTRUCT, AND MAINTAIN ALL MUST BE INSPECTED BY THE DISTRICT'S INSPECTOR.FERENCE DjU WINGS SAFETY DEWC S INCLUDING SHORING, AN SHALL BE SOLELY RESPONSIBLE FOR 10- NOSTALGIAPLACEE , CLUD G SHOR G, D L ' 11 -MO VISTA R GRAVELBAGSCONFORMINGTAATAFEDERALSAFETYANDHEALTHSTANDARDSSOUTHSANTAFESTORMDRAIN..........DWG 1 1 NTE' DRIVE O O ALL LOCAL, STATE, AND FEDE 5. .BEFORE THE WOK IS ALLOWED TO BEGIN, THE CONTRACTOR SHALL CONTACT THE DlS1RIC7 S ENGINEERING ,` 25 LAWS AND REGULA 77ONS. _ _ - - 12- SERViCPLACEDEPARTMENTAT7605973116 `TO DETERMINE WHEN OR iF WORK CAN BEGIN AND TO ARRANGE A BUENA VISTA CREEK WATERSHED C,...D WG #7 E .20402 E L CE ISTR /CTS INSPECTOR AT 597 -3126. INSPECTION RE UESTS SHALL BE ESCONDIDO AVE & PALA DR................DWG 1 92 CONSTRUCTION NOTE 3 J. CONTRACTOR SHALL MAKE EXPLORATION EXCA VA 77ONS AND LOCATE EXIS77NG PRE CONSTRUCTION MEETING WITH THE D 0 Q # 9
Q MADE AT LEAST 24 HDQRS IN ADVANCE. POSTAL WAY STORM DRAIN .................. D WG 1834 . UNDERGROUND FACIU77ES SUFFICIENTLY AHEAD OF CONSTRUCTION TO PERMIT REVISIONS # ESCONDJDO AVE REALIGNMENT., .....:...... D WG 1209 FIBER .ROLL TO PLANS IF REVISIONS ARE NECESSARY BECAUSE OF ACTUAL LOCATION OF EXIS77NG # ; 6. THE D/STR/CT REQUIRES ALL NEW AND EXIS77NG WATER LINES TO HAVE El1NER A MINIMUM OF 3& TO 42 INCHES FACILITIES. NOTIFY ENGINEER OF WORK OF ANY DISCREPANCIES BETWEEN THESE PLANS SUB- GRADE, DE LOMA DR...... ... .......................DWG # 1007 OF FINAL COVER OR A MINIMUM OF 18 INCHES OF COVER FROM THE BOTTOM OF THE SUB GRADE 1041CHEVERs - STRAW MAT -SLOPEPROTECTIONANDACTUALFIELDCOND177ONSPRIORTOSTARTINGCONSTRUCTION. SEWER PLANS .............. ........................DWG#374 1695vISGREATER. THE 18 -INCH COVER DOES NOT RELIEVE THE CONTRACTOR FROM LOCATING AND PROIEC77NG EXISTING U11UlI S DURING CONSTRUCTION. THE D /SIR /CT SHALL BE NOTIFlED W4EN STREET STRUCTURAL SEWER PLANS AREA 63- 02 ................DWG,#370 -1701 - E SPLASHWALL4. LOCATION AND ELEVATION OF IMPROVEMENTS TO BE MET BY WORK TO BE DONE SHALL SOUTH SANTA FE STORM DRA1N...,......DWG 1251 BE C NFJRM Y FIELD MEASUREMENTS PRI R TO CONSTRUCTION OF NEW WORK. CT10NS ARE DETERMINED BY THE APPROPRIATE ROAD AGENCY HAVING JURISDICTION OVER THE STREET.
THE # 0 ED B ELD
O - _ _. :. ., ... . _. v,..... _, ........ _- OLE EXPENSE COMPLY WMTH THAT AGENCY'S RE UlREMENTS SOU77-i._SANTA FE STORM DRA /N.........DWG1251DEVELOPERORHISCONTRACTORSHALL, A T HISS Q SILT FENCE BEFORE EXCAVA77NG FOR THIS CONTRACT, VERIFY LOCA77ON OF UNDERGROUND AND OBTAIN THE DISTRICT'S WRITTEN APPROVAL ON THE PLANS OF ANY COVER CHANGES BEFORETHE 5' 1NSTALLA110N Of THE WA1ER LINE OR BEFORE REMOVING EXISTINGCOVER. UTILITIES. THE EXISTENCE AND LOCA71ON OF ANY UNDERGROUND UTILITY PIPES OR
OPMENT DRA INA GE PR OJE C T (CIPA
8001) t WORK TO BEDONESTRUCTURESSHOWVONTHESEPLANSHASBEENOBTAINEDFROM AVAILABLE 7. UNAUTHORIZED CONNECTIONS TO THE DISTRICT'S WATER SYSTEM FOR CONSTRUCTION WATER OR ANYOTHERRECORDSONLYANDMAYNOTREFLECTALLEXIS71NGURLI77ES. LOCA 77ONS OF ALL DISTRICTS RU THE IMPROVEMENT WORK SHALL BE PERFORMED IN ACCORDANCE WI TI-f THEFOLLOWINGEXISTINGU71U77ESSHALLBECONFIRMEDBYFIELDMEASUREMENTSBYCONTRACTORPURPOSEISSTRICKLYFORBIDDENANDARESUBJECTTOENFORCEMENTUNDERTHEISTRICSLES AND REGULATIONS THE CONTRACTOR WMLL BE CHARGED A MINIMUM FEE (REFER TO CURRENT FEE SCHEDULE) FOR DOCUMENTS, CURRENT AT THE 77ME OF CONSTRUCTION, AS DIRECTED BY 7HECITYPRIORTOCONSTRUCTIONOF WORK. MA AMOUNT OF WATER USED THROUGH ANY UNAUTHORIZEDENGINEER; UNAUTHORIZED CONNECTION AS THE ES11 TED 6. CONTRACTOR IS REQUIRED TO TAKE PRECAUTIONARY MEASURES TO PROTECT THE CONNEC710N AND 7HE DISTRICT MAY CONFlSCATE ANY HOSES VALVES OR 01HER APPt1R7ENCES USED TO
MAKE V STA DEVELOPMENTCODEUTILITYLINESSHOWNHEREONANDANYOTHEREXISTINGLINESNOTOFRECORDORANYUNAUTHORIZED CONNEC710. NOT SHOWN ON THESE PLANS 2. CITY OF VISTA STANDARD DRAWINGS 8. THESE PLANS ARE 7HE SUBJECT OF ADD1110NAL WATER N01FS CONTAINED IN THE SPEgFlCAflONS MANUAL AND 3. THIS SET OF PLANS 7. WHERE TRENCHES ARE ADJACENT TO FUTURE BUILDING SITES, SOILS REPORTS WHICH THOSE N01ES WILL ALSO BE DISPENSED TO THE CONTRACTOR AT 7HE REQUIURED PRECONSIRUC7IOV MEEDNG 4. THE STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION (GREEN BOOK) CERTIFY THAT TRENCH BACKFlLL WAS COMPACTED AS DIRECTED BY THE SOILS AND THE SAN DIEGO SPECIAL PROVISIONS ENGINEER IN ACCORDANCE WITH THE ON -SITE EARTHWORK SPECIFICA110NS SHALL BE SUBMITTED TO THE ENGINEER OF WORK BY A QUALIFlED SOILS ENGINEER. 5. THE SAN DIEGO AREA REGIONAL STANDARD DRAWINGS AND AS MAY BE
MODIFIED BY THE CITY OF VISTA
STANDARDS 8. SAFETY FENCES SHALL BE PRONDED BY THE CONTRACTOR WHERE REQUIRED BY THE CONTRACTORS NO CONSTRUCTION CONTRACTOR AGREES THAT IN ACCORDANCE N77H GENERALLY 6. THE VID STANDARDS AND SPECIFICAI)ONS FOR WATER CITY ENGINEER. ACCEPTED CONSTRUCAON PRACTICES, CONSTRUC710N CONTRACTOR WILL BE REQUIRED TO ASSUME SOLE AND COMPLETE RESPONSIBILITY FOR JOB SITE COND1110NS DURING ME COURSE OF CONSTRUCTION OF 9. DURING ACTIVE CONSTRUCAON, AREAS SHALL BE WATERED TO REDUCE FUG117VE DUST. PROJECT, INCLUDING N / SHALL BE DECLAj"TION OF RESPONSIBLECHARGEMADETOAPPLYCONTINUOUSLAANDNOTBELIMITEDTONORMALWORKINGHOURS. CONSTRUC ON 10. CON7R4CTOR SHALL ADJUST ALL PROPOSED AND EXISTING FACILIAES TO GRADE. CONTRACTOR FURTHER AGREES TO DEFEND, INDEMNIFY AND HOLD CITY OF VISTA HARMLESS FROM ANY AND ALL LIABILITY, REAL OR ALLEGED, IN CONNECTION W1TH THE PERFORMANCE OF WORK ON THIS I HEREBY DECLARE THAT 1 AM THE ENGINEER OF WORK FOR THIS PROJECT, THAT 1 HAVE EXERCISED 11. CONTRACTOR SHALL REMOVE/REPLACE/RELOCATE ALL EXISTING FACIU77ES REQUIRED TO PROJECT, EXCEPTING LIABILITY ARISING FROM THE SOLE NEGLIGENCE OF CITY OF VISTA PROFESSIONAL RESPONSIBLE CHARGE OVER THE DESIGN OF THE PROJECT AS DEFINED IN SECTION 6703 OF
THE INSTALL PROPOSED IMPROVEMENTS CALIFORNIA BUSINESS AND PROFESSIONS CODE, AND THAT THE DESIGN IS CONSISTENT WITH CURRENT ENGINEER'S NOTE: THE ENGINEER PREPARING THESE PLANS N7LL NOT BE RESPONSIBLE FOR, OR CITY OF VISTA STANDARDS. 1 AGREE THAT THE WORK PERFORMED BY ME COMPLIES WITH GENERALLY 12. CONTRACTOR SHALL REMOVE/REPLACE/RELOCATE ANY LANDSCAPING/HARDSCAPING LIABLE FOR, UNAUTHORIZED CHANGES &USES OF THESE PLANS. ALL CHANGES TO THE PLANS MUST ACCEPTED STANDARDS AND PRACflCES OF MY TRADE OR PROFESSION. I FURTHER AGREE THAT THE WHICH CONFLICTS IN ANY WAY W 7H THE INSTALLATION OR PROPER FUNCTIONING OF BE IN WRITING AND MUST BE APPROVED BY THE PREPARER OF THESE PLANS. WORK PERFORMED HEREIN IS IN ACCORDANCE WITH THE RULES AND REGULATIONS REQUIRED BY THE THE PROPOSED IMPROVEMENTS CITY OF VISTA. 1 AGREE THAT PLAN CHECK OR REVIEW OF PROJECT DRAWINGS AND SPECIFICATIONS
BY THE CITY OF VISTA, IN ITS CAPACITY AS A PUBLIC ENTITY FOR THE PLANS PREPARED BY ME, IS 13. CURB HEIGHT SHALL BE 6' FACE UNLESS OTHERWISE NOTED ON THE PLANS CONFINED TO A REVIEW ONLY AND IS NOT A DE7ERM/NA170N BY THE CITY OF VISTA OF THE TECHNICAL UNDERGROUND SER VICE A LER T SUFFICIENCY OR ADEQUACY OF THE PLANS OR DESIGN AND 1NEREFORE DOES NOT RELIEVE ME, AS o ENGINEER OF WORK, OF MY RESPONSIBILITIES FOR THE PLANS OR DESIGN OF IMPROVEMENTS BASED SEC770N 4216 Bc 4217 OF THE GOVERNMENT CODE REQUIRES A THEREON. DIG ALERT IDEN71FlCA110N NUMBER BE ISSUED BEFORE A PERMIT TO EXCAVATE" N7LL BE VALID. FOR YOUR DIG ALERT 1 AGREE TO INDEMNIFY AND HOLD HARMLESS THE CITY OF VISTA, ITS OFFICERS, AGENTS, AND I.D. NUMBER CALL UNDERGROUND SERVICE ALERT TOLL FREE
O EMPLOYEES FROM PROPERTY DAMAGE OR BODILY INJURY ARISING SOLELY FROM THE NEGLIGENT
ACTS, ERRORS, OR OMISSIONS OF THE ENGINEER, ITS AGENTS, OR ITS EMPLOYEES, ACTING WITHIN THE COURSE 1- 800 - 422 -4133 TNKJ (2) WORKING DAYS BEFORE YOU DIG. AND SCOPE OF SUCH AGENCY AND EMPLOYMENT, AND ARISING OUT OF THE WORK PERFORMED BY ME. WEB ADDRESS: WWW.DIGALERT.
ORG
o PREPARED _N TIDE OFFICE
OF: F VISTA SANITATION DEPARTMENT 5 SEWER RELCX',4TO Aff( N . 5` fi© V26o87: 00 SV.
I CITY OF VISTA FIRE DEPARTMENT CITY 0 VISTA PLANNING DEPARTMENT VISTA IRRIGATION DISTRICT CITY 0 S}' ( IL 11E Q _ QROFESSjQ BASIN. V VARIOUS LOCATIONS 6oi 21 -2ooaOSp' IIN4' C7; 8f SED, TRAP R'•y {SFf. f3 & 16J i'l (2 ( `Q D. Bu PLANS REVIEWED FOR CONFLICTS ONLY = BUCCOLA o F APCESS RD RSV. PAD, RAMP GRA9f1VG r -
YZENGINEEJUNG, inc
m S1nR( DRAM! RA-WS0 -- RtNCON S7)?aT (.91EET 5 'ty,• , - 2 w No. 27732 rn
r SEWER IMP 3142 Vsta 30 1 , Oceanside, CA 92456 E P 3 -31 -12P tRYS ADDED & SNE ER E N IBF r C
1 eIV0 , 2732 79tDATEVIDDATEN0. DESCRIPTION Z- , --, ' o F F OF CA PR APPROVED REVIEWED BY. DATE APPROVED RCE EXPIRESDAAPPROVEDDATE DATE APPROVED CHANGES.. EN NEER OF WORK RCE DATE COV REVISION :
810112004 X223 TWE \01 VistaRedev\dwa\Borders \IMDBorderTitle.dwa 9/29/2011 2:26:15 PM PDT F: \223 TWE \01 VistaRedev \dwg \2231- i- sd- 01.dwg 10/3/2011 9:47:15 AM PDT SITE DEVELOPMENT PLAN EXPIRES: N/
A THIS PLAN ISVALIDA D FOR 2 YEARS FROM
APPROVAL
STORMWATER INSPECTION PRIORITY HIGH WDID NO. 9
370358749 AS
BUILT 1 w
z• •' RCE 'L EXP. 1
1 DATE REVIEWED
BY:
cm,- INSPECT
DATE CITY of
VISTA IMPROVEMENT PLANS
FOR: SOUTH SANTA FE
REDEVELOPMENT DRAINAGE PROJECT (LIP -
8001 TITLE
SHEET APPR
U.; fl 55075 6 -30 -12 SHEET 1
OF ICY ENGINEER RCE EXPIRES
A BENCH MARK: STATION 2063 IN THE CITY OF
VISTA SURVEY CONTROL NETWORK, ESTABLISHED BY RECORD DWG- 3979 OF SURVEY NO 14023 ELEV 359.22 (NGVD
1929) LD: 10-
009 LN - 20.09
025 P.C.: N/A DWG #• N/
A VID MAPS F15, G15 &
10/27/2026 C3 353 of 424
STORM WATER AND EROSION CONTROL NOTES STORM WATER AND EROSION CONTROL NOTES CONTINUED.
1. TOTAL, AREA OF LAND DISTURBANCE _ - $ ACRES HYDROSEED/NG INSTALLATION.•
2. THIS PROJECT IS SUBJECT TO ALL APPLICABLE GENERAL AND PROJECT SPECIFIC PROHIBITIONS AND REQUIREMENTS 2,000 LBS /ACRE 100% WOOD FIBER MULCH IN CHAPTERS 13. 18, AND 17.56 OF THE VISTA MUNICIPAL CODE AND THE CITY STORMWATER STANDARDS MANUAL. 300 LBS /ACRE 16 -6 -8 COMMERCIAL FERTILIZER
ECOLOGY CONTROL M- BENDER
J. BYPS AT MANNED FACILITIES MUST BE INSPECTED BY THE EROSION CON,ROL CONTRACTOR BEFORE AND 140 LBS /ACRE BETWEEN THE MONTHS OF OCTOBER AND MARCH -OR- FOLLOWING PREDICTED RAIN EVENTS BMPS AT UNMANNED FACILITIES MUST BE INSPECTED BY THE DISCHARGER 80 LBS/ACRE BETWEEN THE MONTHS OF APRIL AND SEPTEMBER REGULARLY DURING THE RA /NY SEASON AND PERIODICALLY BETWEEN EACH RAINY SEASON. THESE BMPS MUST BE PRIOR TO INSTALLATION, ALL CUT SLOPES SHALL BE SCARIFIED OR RIPPED HORIZONTALLY TO DEPTH OF 3 TO 6MAINTAINEDSOTHATTHEYCONTINUETOFUNCTIONASDESIGNEDBMPSWHICHFAILMUSTBEREPAIREDASINCHES SOON AS IT IS SAFE TO DO SO. IF THE FAILURE OF A BMP INDICATES THAT THE BMPS IN USE ARE INAPPROPRIATE OR INADEQUATE TO THE CIRCUMSTANCES, THE BMPS MUST BE MODIFIED OR UPGRADED TO USE MIX ONE, MIX TWO, OR MIX THREE PER ATTACHED CRITERIA.
PREVENT ANY FURTHER FAILURE IN THE SAME OR SIMILAR CIRCUMSTANCES
4. IN THE EVENT OF FAILURE OR REFUSAL TO PROPERLY MAINTAIN S41D DEVICES, THE LAND DEVELOPMENT ENGINEER HYDROSEED MIX ONE
MAY CAUSE EMERGENCY MAINTENANCE WORK TO BE DONE TO PROTECT ADJACENT PRIVATE AND PUBLIC PROPERTY, THE COST (INCLUDING AN INITIAL MOBILIZATION AMOUNT) OF WHICH SHALL BE CHARGED TO THE OWNER. CONDITION. HIGH VlSIB1L/TY, HIGHLY ORNAMENTAL AREAS (ADJACENT TO ROADWAYS, RESIDENTIAL SLOPES, PARK AREAS, ETC.). IN ADDITION, THIS MIX IS SUITED TO ALL SLOPE HEIGHTS HOWEVER, DUE TO THE RELATIVELY SMALLER MATURE 5 SEDIMENTATION BASINS MAY NOT BE REMOVED OR MADE INOPERATIVE WITTIDUT PRIOR APPROVAL OF THE LAND SIZE' OF THE PLANT MATERIAL, IT IS ESPECIALLY SUITED TO SLOPES LESS THAN TEN FEET IN HEIGHT. IN THESE
CONDITIONS, THE PLANT MATERIAL WILL NOT EXTEND MUCH THE LIMITS OF THE SLOPE DEVELOPMENT ENGINEER.
BEYOND
APPLICATION RATE BOTANICAL NAME
6 TEMPORARY EROSION CONTROL DEVICES SHOWN ON THE EROSION CONTROL PLAN WHICH INTERFERE WITH THE
WORK SHALL BE RELOCATED OR MODIFIED AS THE WORK PROGRESSES AS RECOMMENDED BY THE ENGINEER OF NURSE CROP WORK AND AS APPROVED BY THE LAND DEVELOPMENT ENGINEER. 3 LBS /ACRE LOBULARIA MARITIMA 'CARPET OF SNOW' 1 3 LBS /ACRE LOBULARIA MARITIMA 'ROYAL CARPET' 2
Z ALL LOOSE SOIL AND DEBRIS SHALL BE REMOVED FROM THE STREET AREAS UPON STARTING OPERATIONS, AND 3 -LBS /ACRE ENCHOCHOLZ /A CALIFORNICA PERIODICALLY THEREAFTER, AS DIRECTED BY THE INSPECTOR. 3 LBS /ACRE LINUM GRANDIFLORUM 'RUBRUM' 6 A 12 INCH HIGH BY 4 -FOOT WIDE BERM SHALL BE MAINTAINED ALONG THE TOP OF SLOPE OF THOSE FILLS ON PERENNIALS WHICH GRADING IS NOT IN PROGRESS CONCENTRATED WATER SHALL BE CARRIED NOT CLOSER THAN 10 FEET 9 LBS /ACRE ATRIPLEX SEMIEIACCATAFROMTHETOPOFSLOPES
5 LBS /ACRE GAZANIA 'PIXIE DELIGHT' 3
STAND -BY CREWS SHALL BE ALERTED BY THE CONTRACTOR, PERM /TTEE, OR OWNER FOR EMERGENCY WORK 6 LBS /ACRE 2 LBS /ACRE
L /MON /UM PEREZ //
OENOTHERA CHE/RANTH/FOLIADURINGRAINSTORMS
SHRUBS BEES
10. ALL UTILITY TRENCHES SHALL BE BACKF/LLEO WITHIN 24 HOURS AND MUST BE BACKFILLED BEFORE THE END OF THE WORK DAY IF A 40% CHANCE OF RAIN /5 PREDICTED. 2 LBS /ACRE ACACIA SAL/GNA 3 LBS /ACRE M/MULUS PUNICEUS
11. ALL BUILDING PADS SHALL BE SLOPED TOWARDS THE DRIVEWAY AND VELOCITY CHECK DAMS PROVIDED AT THE 4 LBS /ACRE ENCELIA COLIFORN104 BASE OF ALL DRIVEWAYS DRAINING INTO THE STREET. VELOCITY CHECK DAMS SHALL BE PROVIDED ACROSS THE 3 LBS /ACRE CISTUS CORSICUS
OUTLETS OF ALL LOTS DRAINING INTO THE STREET
47 LBS /ACRE TOTAL
12 PROVIDE VELOCITY CHECK DAMS IN ALL STREET AREAS, PAVED OR UNPAVED, AT THE INTERVALS INDICATED BELOW VELOCITY CHECK DAMS MAY BE CONSTRUCTED OF GRAVELBAGS, TIMBER, OR OTHER EROSION RESISTANT MINIMUM PURITY OF SEED - 95X
MATERIALS APPROVED BY THE LAND DEVELOPMENT ENGINEER, AND SHALL EXTEND COMPLETELY ACROSS THE STREET OR CHANNEL AT RIGHT ANGLES TO THE CENTERLINE: EARTHEN DIKES MAY NOT BE USED AS VELOCITY 1 CAN BE USED WITHOUT 'ROYAL CARPET' AT THE RATE OF 5 LBS /ACRE CHECK DAMS 2 CAN BE USED WITHOUT 'CARPET OF SNOW' AT THE RATE OF 5 LBACRE 3 CAN BE SPECIE /ED IN EITHER WHITE, ORANGE OR YELLOW, OR MIX, D
STR GRADE CHECK DAM INTERVAL
LESS THAN 2X AS REQUIRED HYD SEED MlX TWO
2X TO 4X 100 FEET
4X TO 1 O 50 FEET CONDITION: MODERATE VISIBILITY (INTERIOR SLOPES OF COMMERCIAL AND INDUSTRIAL DEVELOPMENTS).
OVER 1 OX 25 FEET
APPLICATION RATE BOTANICAL NAME
13 PROVIDE VELOCITY CHECK DAMS IN ALL UNPAVED GRADED CHANNELS AT THE INTERVALS INDICATED BELOW NURSE CROP UNLESS CHANNELS ARE LINED WITH TEMPORARY MATERIALS SUCH AS PLASTIC SHEETING 3 LBS /ACRE LOBULARIA MARITIMA 'CARPET OF SNOW' 4 3 LBS /ACRE LOBULARIA MARITIMA 'ROYAL CARPET' 5
CHANNEL GRADE CHECK DAM INTERVAL 3 LBS /ACRE ENCHOCHOLZ/A CALIFORNICA LESS THAN 3X 100 FEET 2 LBS /ACRE LINUM GRAND /FLORUM 'RUBRUM' 3X TO 6X 50 FEET
PERENNIALSOVER6X25FEET
14. A GRAVELBAG SILT BASIN, OR SILT TRAP, SHALL BE PROVIDED AT EVERY STORM DRAIN INLET TO PREVENT 14 LBS /ACRE
8 LBS /ACRE LOTUS
NUM FASICULAI'UM
LOTUS SCOPARIUS
SEDIMENT FROM ENTERING T,`JE STORM DRAIN SYSTEM. 9 LBS /ACRE ATRIPLEX SEMI&CCATA
15. A GUARD SHALL BE POSTED ON SITE WHENEVER THE DEPTH OF WATER IN ANY DEVICE EXCEEDS TWO FEET. 7 LBS /ACRE
3 LBS /ACRE
ATRIPLEX GLAUCA
ARTEM/SIA PYCNOCEPHALA
16 ALL REMOVABLE PROTECTION DEVICES SHOWN SHALL BE IN PLACE AT THE END OF EACH WORKING DAY WHEN SHRUBS REFS THE 5 -DAY RAIN PROBABILITY FORECAST EXCEEDS 40X. AFTER EACH RAINSTORM EXCEEDING M INCH IN A 12 HOUR PERIOD, SILT AND DEBRIS SHALL BE REMOVED FROM CHECK DAMS AND DESILTTNG BASINS, AND BASINS 2 LBS /ACRE M/MULUS PUNICEUS SHA LL BE PUMPED DRY, 3 LBS /ACRE ENCELIA COL IFORNICA
5 LBS /ACRE VIQUIERA LACINIATA
17 EFFECTIVE PLANTING SHALL BE INSTALLED, FULLY GERMINATED, AND SHALL EFFECTIVELY COVER THE REQUIRED 2 LBS /ACRE SALVIA CLEVELAND// SLOPES PRIOR TO FINAL APPROVAL. THE PLANTING MIX SHALL BE APPROVED BY THE LAND DEVELOPMENT 2 LBS /ACRE SAL V/A MELLIFERA ENGINEER PRIOR TO INSTALLATION. SPRINKLER SYSTEMS ARE REQUIRED ON ALL SLOPES OVER FIVE FEET IN HEIGHT TEMPORARY SPRINKLER SYSTEMS WILL BE REQUIRED ON ALL SLOPES UNTIL PLANTING IS ESTABLISHED, 67 LBS /ACRE TOTAL AND MAY NOT BE REMOVED WITHOUT PRIOR APPROVAL OF THE LAND DEVELOPMENT ENGINEER.
NOTE FOR NON - IRRIGATE APPLICATIONS, INCREASE THE APPLICATION RATE BY 207 OF THE FOLLOWING SPECIES-
18. GRAVEL BAGS AND NECESSARY MATERIALS SHALL BE AVAILABLE ON SITE AND STOCKPILED AT CONVENIENT
ERIOGONUM FASICULATUMLOCATIONSTOFACILITATERAPIDCONSTRUCT /ON OF TEMPORARY DEVICES OR TO REPAIR ANY DAMAGED EROSION ATRIPLEX GLAUCA CONTROL MEASURES, WHEN RAIN IS IMMINENT. A STAND -BY CREW SHALL BE MADE AVAILABLE AT ALL TIMES ATRIPLEX SEM /BACCA TA DURING THE RAINY SEASON. ENCELIA COL IFORNICA
1. ANY PROPOSED ALTERNATE EROSION CONTROL MEASURES ARE TO BE RECOMMENDED BY THE ENGINEER OF NON- IRRIGATED APPLICATIONS REQUIRE THE PRIOR APPROVAL OF THE ENGINEERING DEPARTMENT WORK, FOR APPROVAL BY THE LAND DEVELOPMENT ENGINEER, PRIOR TO INSTALLATION.
MINIMUM PURITY OF SEED - 95X
20FROM OCTOBER 1ST THROUGH APRIL 30TH OF EACH YEAR, CHAPTER 1756 REQUIRES THAT ALL DENUDED 4 CAN BE USED WITHOUT ROYAL CARPET , AT THE RATE OF 5 LBS /ACRESLOPEFACESBEPROTECTEDFROMEROSIONANDTHATALLSEDIMENTBEKEPTONSITE. THE USE OF INDUSTRY 5 CAN BE USED WITHOUT 'CARPET OF SNOW AT THE RATE OF 5 LBS /ACRESTANDARDSLOPEPROTECTIONANDSEDIMENTCONTROLMETHODSAREREQUIREDTOBEINPLACEANDMAINTAINED 24 HOURS A LA Y17 LAYS A WEEK.
HYDRQ,5_M MIX 7IlREE
21.MATERIALS AND WASTE WITH THE POTENTIAL TO POLLUTE URBAN RUN -OFF SHALL BE USED ,WITH LABEL DIRECTIONS AND SHALL BE STORED IN A MANNER THAT EITHER PREVENTS CONTACT WITH RAINFALL OR CONTAINS CONDITION.• LOW VISIBILITY, OPEN SPACE AREAS CONTAMINATED RUN -OFF FOR TREATMENT AND DISPOSAL.
APPLICATION RATE BOTANICAL NAME
22CONTRACTOR TO IMPLEMENT AND MAINTAIN ONS/TE AT ALL TIMES A [STORMWATER MANAGEMENT PLAN (SWMP) NURSE CROP OR STORMWATER POLLUTION PREVENT /ON PLAN (SWPPP)J IN CITY APPROVED FORMAT WHICH IS HEREBY 10 LBS %ACRE BROMUS RUBENS INCORPORATED WITH THESE PLANS BY REFERENCE. SAID PLAN SHALL BE KEPT CURRENT AND REFLECTIVE OF 3 LBS /ACRE ENCHOCHOLZ /A CALIFORNICA
CURRENT SITE CONDITIONS
STATE WATER RESOURCES CONTROL BOARD CERTIFICATE
PERENNIAL
10 LBS /ACRE ATRIPLEX SEMIBACCATA
DEVELOPMENT OF THIS PROJECT SHALL COMPLY WITH ALL REQUIREMENTS OF STATE WATER RESOURCES CONTROL 8 LBS /ACRE LOTUS SCOPAR /US BOARD (SWRCB) ORDER NO 99 -08 DWQ. NPDES GENERAL PERMIT NO. CAS000002. WASTE DISCHARGE 10 LBS /ACRE ATRIPLEX GLAUCA REQUIREMENTS FOR DISCHARGES OF STORM WATER RUNOFF ASSOCIATED WITH CONSTRUCTION ACTIVITY, IN 8 LBS /ACRE ATRIPLEX CAMESCENS ACCORDANCE WITH SAID PERMIT, A STORM WATER POLLUTION PREVENTION PLAN (SWPPP) AND A MONITORING 2 LBS /ACRE HAPLOPAPPUS VENETUS PROGRAM PLAN SHALL BE : DEVELOPED AND IMPLEMENTED CONCURRENT WITH THE COMMENCEMENT OF GRADING
SHRUBS REFS
ACTIVITIES AND A COMPLETE AND ACCURATE NOTICE OF INTENT (N0l) WILL BE FILED WITH THE SWRCB, A COPY OF THE ACKNOWLEDGEMENT FROM THE SWRCB THAT A NOl HAS BEEN RECEIVED FOR THIS PROJECT SHALL BE FILED WITH 3 LBS /ACRE MIMULUS PUNICEUS THE CITY OF VISTA WHEN RECEIVED, FURTHER, A COPY OF THE COMPLETED N0I FROM THE SWRCB SHOWING THE 3 LBS /ACRE 84CCHARIS PILULAR/S 'CONSANGUIENA' PERMIT NUMBER FOR THIS PROJECT SHALL BE FILED WITH THE CITY OF VISTA -WHEN RECEIVED. (WDID NO.) 3 LBS /ACRE ENCELIA COL/FORN/CA ALBS, ACRE VIQUIERA L4CIN14TA
IN ADDITION, THE UNDERSIGNED AND SUBSEQUENT OWNERS(S) OF ANY PORTION OF THE PROPERTY COVERED BY THIS GRADING PERMIT NO GP- , AND BY THE SWRCB ORDER NO. 99 - 08 DWQ, AND ANY SUBSEQUENT 65 LBS /ACRE TOTAL AMENDMENTS THERETO, SHALL COMPLY WITH SPECIAL PROVISIONS AS SET FORTH IN SECTION 0 7 OF THE SWRCB ORDER NO 99_08 DWQ. NOTE • FOR NON- IRRIGATE APPLICATIONS, INCREASE THE APPLICATION RATE BY 20X OF THE FOLLOWING SPECIES:
ERIOGONUM FASICULATUM
CITY OF VISTA ATRIPLEX GLAUCA
ATRIPLEX SEMIBACCATA
OWNERS OF LAND ENCELIA COL IFORNICA
NON- IRRIGATED APPLICATIONS REQUIRE THE PRIOR APPROVAL OF THE ENGINEERING -DEPARTMENT
SIGNATURE OF LA OWNER, DATE
CORPORATE OFFICER, GENERAL MINIMUM PURITY OF SEED - 95X
PARTNER OR PROPRIETOR
GENERAL NOTES FOR GRADING PLANS
1. ALL GRADING IS TO BE DONE IN ACCORDANCE WITH THE CITY OF VISTA DEVELOPMENT CODE, CHAPTER 17, SECTION 17.56 AND THEG SOILS SORT PREPARED BY V' ' i a n (SOILS ENGINEER), KNOWN AS JOB NUMBER
2. THIS GRADING PLAN DOES NOT AUTHORIZE WORK TO COMMENCE PRIOR TO THE ISSUANCE OF A GRADING PERMIT BY THE CITY OF VISTA.
3. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO LOCATE ALL SUBSTRUCTURES, WHETHER SHOWN HEREON OR NOT, AND PROTECT. THEM FROM DAMAGE THE EXPENSE OF REPAIR OR REPLACEMENT OF SAID STRUCTURES SHALL BE BORNE BY THE CONTRACTOR.
4. A PERMIT FROM THE DEVELOPMENT SERVICES DEPARTMENT WILL BE REQUIRED PRIOR TO ANY WORK WITHIN THE CITY OF VISTA RIGHT -OF -WAY.
5. NO BUILDING PERMITS WILL BE ISSUED AND NO BUILDING INSPECTIONS WILL BE MADE UNTIL ROUGH GRADING HAS BEEN APPROVED PER CITY OF VISTA.
6. ALL CUT AND FILL SLOPES SHALL BE NO STEEPER THAN TWO HORIZONTAL TO ONE VERTICAL UNLESS OTHERWISE SPECIFIED
BY AN APPROVED SOILS ENGINEERING REPORT AND THE CITY ENGINEER 7 ALL SLOPES SHALL BE PLANTED WITH A GROUND COVER AS APPROVED BY THE CITY OF VISTA PLANNING DEPARTMENT.
8. THE FACE OF CUT ANDIOR FILL SLOPES SHALL BE PREPARED AND MAINTAINED TO CONTROL AGAINST EROSION PER CITY OF VISTA DEVELOPMENT CODE, CHAPTER 17, SECTION 56.
9. ALL MAJOR SLOPES SHALL BE ROUNDED INTO -EXISTING TERRAIN TO PRODUCE A CONTOURED TRANSITION FROM CUT OR FILL TO NATURAL GROUND ABUTTING CUT OR FILL SURFACES.
10. A PRELIMINARY SOILS REPORT SHALL BE SUBMITTED PRIOR TO GRADING APPROVAL.
11. A FINAL SOILS REPORT, WITH ORIGINAL SIGNATURE /SEAL OF SOILS ENGINEER, SHALL BE SUBMITTED IN DUPLICATE PRIOR TO ROUGH GRADING APPROVAL, AND MUST PROVIDE THE FOLLOWING INFORMATION. a. SOILS BEARING VALUE
b. EXPANSIVE CHARACTERISTICS
c. FOUNDATION RECOMMENOATION
d. DISPOSITION OF LARGE ROCKS ENCROACHING ONTO THE FOUNDATION e. COMPACTION REPORT ON GRADED LOTS
f. ELEVATION OF WATER TABLE IF ENCOUNTERED
g. A PLAT SHOWING THE LOCATIONS OF TEST BORINGS AND /OR EXCAVATIONS
12. ALL ON -SITE AND PRIVATE RESIDENTIAL DRIVEWAYS MUST HAVE A MINIMUM THICKNESS OF 4 INCHES CONCRETE OR 2 INCHES ASPHALT OVER 6 INCHES CLASS 3 BASE, AND MUST BE INSPECTED BY THE ENGINEERING DEPARTMENT...
13. THE STRUCTURAL SECTION OF PARKING LOTS AND DRIVEWAYS ON ALL COMMERCIAL AND INDUSTRIAL COMPLEXES SHALL BE DESIGNED BASED ON "R" VALUES OF SOILS AND ON A MINIMUM Tt OF 4.5 IN PARKING STALLS AND A MINIMUM T.I. OF 6.0 IN THE DRIVE LANES THE MINIMUM SECTION SHALL BE 3" A.C. ON 6" CLASS 2 BASE, OR MINIMUM 40 PCC ON NATIVE.
STRUCTURAL SECTIONS DESIGN TO BE APPROVED BY THE CITY ENGINEER PRIOR TO CONSTRUCTIONN, ALL CURBS, GUTTERS AND SIDEWALKS MUST HAVE A MINIMUM OF 6" CLASS 3 BASE, OR AS RECOMMENDED BY THE SOILS ENGINEER AND APPROVED BY THE CITY ENGINEER.
14. THE PERMITTEE SHALL GIVE NOTICE TO THE CITY OF VISTA ENGINEERING INSPECTION DEPARTMENT FOR A PRE - CONSTRUCTION CONFERENCE AT LEAST 48 HOURS PRIOR TO COMMENCING THE WORK. ANY WORK DONE WITHOUT PROPER INSPECTION WILL BE SUBJECT TO REJECTION. PHONE (760) 639 -6113 FOR INSPECTIONS.
15. A FENCE AT LEAST THREE AND ONE -HALF FEET (3 -1/2) IN HEIGHT SHALL BE CONSTRUCTED AT THE TOP OF ANY VERTICAL CUT OR RETAINING WALL EXCEEDING FOUR FEET (4) IN HEIGHT, OR AT THE TOP OF ANY CUT OR FILL EXCEEDING FIFTEEN FEET (15) IN HEIGHT
16. EROSION CONTROL OF SLOPES - ALL SLOPES IN EXCESS OF 5 FEET IN VERTICAL HEIGHT SHALL BE HYDROSEEOED IN
ACCORDANCE WITH THE FOLLOWING SPECIFICATIONS (UNLESS SUPERSEDED BY AN APPROVED EROSION CONTROL OR LANDSCAPING PLAN).
17 "AS BUILT" DRAWINGS MUST BE SUBMITTED BY THE ENGINEER OF WORK AND APPROVED BY THE CITY ENGINEER PRIOR TO FINAL ACCEPTANCE OF WORK.
P
YaX ,
I ...... MiMil mvx/7
1. A CONSTRUCTION PERMIT IS REQUIRED FROM ALL CONTRACTORS PERFORMING ANY OF THE WORK SHOWN ON TINS PLAN, THE PERMIT CAN BE OBTAINED AT THE CITY OF VISTA DEVELOPMENT SERVICES CENTER, 600
EUCALYPTUS AVENUE, VISTA, CA A PERMIT WILL BE ISSUED ONLY TO THE CONTRACTOR WHO IS TO PERFORM TIDE WORK. 7HE PERM17TEE SHALL GIVE NOTICE TO THE CITY OF VISTA ENGINEERING INSPECTION DEPARTMENT FOR A PRE - CONSTRUCTION CONFERENCE AT LEAST 48 HOURS PRIOR TO COMMENCING THE WORK. ANY WORK DONE WITHOUT PROPER INSPECTION WILL BE SUBJECT TO REJECTION. a. PHONE (760) 639 -6113 FOR INSPECTION.
2. ALL WORK SHALL BE DONE IN ACCORDANCE WITH THIS PLAN, THE STANDARD SPECIFICATIONS FOR PUBLIC
WORKS CONSTRUCTION, AND THE SAN DIEGO SPECIAL SUPPLEMENT TO THE STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION, AS LAST AMENDED.
J. THE STRUCTURAL SECTION OF THE STREET(S) SHALL BE DESIGNED BASED ON "R° VALUES OF SOILS AND ON A TI, OF 6.0. MINIMUM SECTION SHALL BE 4" A.C. ON 8" CLASS 2 BASE. STRUCTURAL SECTIONS DESIGN TO BE APPROVED BY THE CITY ENGINEER PRIOR TO CONSTRUCTION. ALL DRIVEWAY APRONS, CURB AND GUTTER AND SIDEWALKS WITH AN 'R' VALUE LESS THAN 25 MUST HAVE A MINIMUM OF 6" CLASS 3 BASE OR EQUAL.
4. AN "AS BUILT" DRAWING(S) SHALL BE SUBMITTED BY THE ENGINEER OF WORK AND APPROVED BY CITY ENGINEER PRIOR TO THE ACCEPTANCE OF THE IMPROVEMENTS SEPARATE "AS BUILT' DRAWING(S) SHALL BE SUBMITTED FOR THE STREET LIGHTING SYSTEM.
5. PRIOR TO CONSTRUCTION OF STREET LIGHTS, A PLAN [ON FULL SIZED SHEET(S)] APPROVED BY SAN DIEGO GAS ELEC7RIC SHOWING EXACT PLACEMENT OF ALL STREET LIGHTS, PULLBOXES, SIZE AND LOCATION OF CONDUITS AND SOURCES OF POWER SHALL BE SUBMITTED TO THE CITY ENGINEER.
V EVI°I. 911512004 F: \223 TINE \01 VistaRedev \dwg \2231 - i- sd- 02- notes.dwg 10/5/2011 11:21:46 AM PDT 4 LN 2009-025 VID MAPS
10/27/2026 C3 354 of 424
1®
CO REVISION: 911512004
DA20SEWERIMPROVEUTS - LINE C & E - rALA VISTA DRIVE & NATAL WAY 21 SEWER IMPROVEMTS - LINE D - MERCANTILE STREET
22 SEWER IMPROVEMENTS - LINE F - RINCON STREET
23 EROSION AND SEDIMENTATION CONTROL NOTES & DETAILS
INDEX Mail 24 EROSION AND SEDIMENTATION CONTROL PLAN
25 PHASE 1 CONSTRUCTION PLAN
INDICATES SHEET NO.
LINE B ------ POICATES MVE NO.
PREPARED IN THE OFFICE OF.-
7601721-2000BUCCOLA
ENGINEERING, ine
SEWER IMP. PLANS ADDED & SHEVS RE-NUMBERED 74-It- PAP 3M2 Vista Way, Suite 301, Oceanside, CA 92056 N0. DESCRIPTION CITY DATE VIA DATE' 27732
APPROVED CHANGES ENGINEER OF WORK RCE DATE
F:\223 TWE\01 Vista Redev\dwg\2231 —i—sd —03. dwg 1 /31 /2012 1-49:16 PM PST LN 2009-025 VID MAPS F15, G15 & G1610/27/2026 C3 355 of 424
SECTIONB-B
scac ...z.
SECTION A -A
SCALE 1 " =2'
NOTES:
1. ALL PRECAST COMPONENTS SHALL BE REINFORCED WITH 114" DIAMETER STEEL, WOUND SPIRALLY ON 4" CEN7ERS
2. ALL JOINTS SHALL. BE SET IN CLASS C MORTAR.
J. MAINTAIN 1 -112" CLEAR SPACING BETWEEN REINFORCING AND SURFACE UNLESS OTHERWISE NOTED.
4. MANHOLE SHALL BE LOCATED SO THAT THE INSIDE EDGE OF THE SHAFT IS DIRECTLY OVER THE INSIDE FACE OF THE STRUCTURE.
5. MANHOLE SHALL BE DESIGNATED "STORM GRAIN"
TRANSITION STRUCTURE DETAIL
LINE 0 -3
PLAN
scams: 1 ° =z'
CONSTRUCT CAST IN P49CB RE /NFORCED CONCRETE SINGLE BOX CULVERT PER CALTRANS STANDARD PLAN 080 k 082 AND MODIF'!ED PER DETA/L HEREON
SECTION D -D
SCALE 1• =1
TABLE FOR DETAIL A
FOR DIMENSIONS &BAR SIZES
B
INCHES
T
INCHES
w
i i
EXISTING STRUCTURE
J BARS
18 6 15 14 0 6" OC 14 ® 12" OC
36 8 15 14 0 6" OC 14 0 12;;
W BARS
10 16 15 ® 6" OC 15 ® 12" OC
2 -H BARS 2 -D BARS
4" OC F BARS
3" RADIUS
Q' 14 BARS 1
o 18 OC 1
Qj 3" RADIUS 1 .-- --"—
J BARS
2 -E BARS
2-G
4 OC
w
W BARS 4 SECTION X—X
I' SCALE- 1 "2'
TABLE FOR DETAIL A
FOR DIMENSIONS &BAR SIZES
B
INCHES
T
INCHES
D, E, H&
G BARS F BARS J BARS
18 6 15 14 0 6" OC 14 ® 12" OC
36 8 15 14 0 6" OC 14 0 12;;
54 10 16 15 ® 6" OC 15 ® 12" OC
NOTES
1. W BARS ARE OF SIZE AND SPACING OF EXISTING WALL STEEL AND SHALL BE CUT IN CENTER OF OPENING AND BENT INTO TOP AND BOTTOM OF JUNCTION STRUC7URf. 2 BACKFiLL UNDER STRUCTURE WITH 2,000 PSI CONCRETE (BACKFILL MAY BE OMITTED IF
STRUCTURE IS LAID ON UNDISTURBED EARTH TO STORM DRAIN WELL) J. CONCRETE SHALL BE 270Kg PER 081C METER-C-14-Moo (470 -C -2000)
4. FILL OPENING BETWEEN TWIN PIPES WITH 2,000 PSI CONCRETE UP TO SPRlN6LlNE OF PIPE Km
SECT /ON E -E
SCALE- , - =r
x
COQ° REVISION. 911512004 F: \223 TWE \01 Vista Red ev \dwg \2231 —i- sd- 04.dwg 10/11/2011 9:20:13 AM PDT LN 2009-025 VI D MAPS F15, G15 & G16
10/27/2026 C3 356 of 424
i---------------
3 k ,
1 t
L 1 N5072'44 "E 31.97'
L2 N35®3449 "E 40.79'
L3 N0576'11 "E 53.59'
Ma5
L-21'
AC WATER Mr
p -1399 -1974
STORMORAIN LINE DATA
BEARING DISTANCE
L 1 N5072'44 "E 31.97'
L2 N35®3449 "E 40.79'
L3 N0576'11 "E 53.59'
a
i..
P
t - -.... . -- z _
1 +00 1.00
R' 21' 6'
LOCAL DEPRESSION DETAIL A
lij j N
004y'J' °
MOD. TYPE C CURB INLET
Ox
g
x
L
6' 21' 6'
L0LAL DEPRESSION DETAIL B
SCALE:• I = 8.
0 n
I:- --- -
PROFILE SCALE
1 " = 4' VERT.
1 " = 20' HORIZ.
SC" 1 " = 20'
20 0 20 40
A6AS-BUX
ASEEWER IMP. PLANS ADDED & SHEETS RE-NUMBERED
N0. DESCRIPTION a1r
APPROVED CHANGES
07 CONSTRUCTION NOTES
D-CONSTRUCT 18" RCP STORM DRAIN
Q-CONSTRUCT 24 » RCP STORM DRAIN.
O-CONSTRUCT CURB INLET TYPE B PER SDRSD D -2 TO MATCH INVERT OF EXISTING INLET BEING REPLACED (APPROX. 6.5' DEEP)
@19 CONSTRUCT CONCRETE LUG PER SDRSD D-63
F @-JOIN XI IN STRUCTURE PER DETAIL A, SHEET 4
SAWCUT & REMOVE EXISTING CURB & GUTTER
CONSTRUCT LOCAL DEPRESSION PER DETAIL HEREONw„
dam•'- -° -Wwa
N ^--- .- .,.,.,,,,.,._. EXISTING STORM DRAIN CATCH BASIN TO BE REMOVED TM ` CONSTRUCT CURB INLET TYPE 'A" PER SDRSD D -1
39 EXISTING TREE TO BE REMOVED & REPLACED
@0)-SAWCUT, REMOVE & REPLACE EXISTING PCC SIDEWALK
AS SHOWN TO NEAREST JOINT
A_ 51 EXISTING UTILITY CONFLICT (TO BE RELOCATED BY OTHERS) f, @-SAWCUT, REMOVE & REPLACE EXISTING AC PAVEMENT MATCH EXIST PER VSD SRF 8A & 88 TYPE A
@-EXISTING UTILITY (PROTECT IN PLACE)
REPLACE TRAFFIC SENSOR LOOPS DAMAGED BY CONSTRUCTION
NOTE.-
CONTRACTOR SHALL BE RESPONSIBLE FOR RELOCATION CO- ORDINATION OF ALL DRY UTILITIES REQUIRED.
CONTRACTOR TO PROTECT IN PLACE ALL CITY OF VISTA TRAFFIC SIGNAL o CONDUITS STREET LIGHTS & STREET LIGHT RUNS.
Q _ WHERE SDG &E ELECTRIC CONDUITS ARE IN CONFLICT THE CONTRACTOR SHALL
CO- ORDINATE WITH SDG &E TO RELOCATE CONDUITS IN ADVANCE OF THE STORM DRAIN CONSTRUCTION.
G q• , G 0• GEC o•
S
LOCAL DEPRESSION DETAIL C
CITY of VISTA_
I .
a ,
IMPROVEMENT PLANS FOR. -
SOUTII SANTA rEj REDEVELOPMENT
PREPARED IN THE OFFICE OF.-
DRAINAO E PROJE'T (CIP-8001)
2404 q STORM DRAIN LINE K
BUCCOLA
L & M7601721 C, D. BU,
E—AIGINEERING, inc XllWNo. 2 32
55075 6 -30 -1 Z SHEET 11 OF25
Or- - far CI ENGINEER RCE EXPIREt D E
t 342 Vista Way, S 301, Oceanside, 92056 * Exp. 3 -31 -12 s BENCH MARK: STATION 2063 IN THE CITY OF VISTA
ViD DATE 27732 jp. j 9
F
HIV I` \
Fp SURVEY CONTROL NETWORK, ESTABLISHED BY RECORD D WG- 59 79
ENGINEER OF WORK RCE DATE
Op CA` OF SURVEY NO 14023 ELEV 359.22 (NGVD 1929)
COV REVISION. 911512004
F: \223 TWE \01 Vista Redev \dwg \2231— i —sd -1 1.dwg 2/21/2013 8:50:24 AM PST LN 2009-025 VI D MAPS F15, G15 G 1 6
10/27/2026 C3 357 of 424
I _ t- - - - - --
5 ;__11,..
IjI
l_jl=
1 -------- __
1 1-11 --- L ...
I -------
1-1 - -
J ---- __
F t
h .
I
1- 1._,., -- -
i - ---- ------ ,
1i 1. _ _ --- ---- _ '___':___'
yl -, ,
I I I ------- -------- Im -- ------ ------ ------ ----
11 __.l. -1 -1 - - -, 11 , _'__- J ----------- "_["_'_'L_ Jf-'_ -_ " --:-_-__'L --- -.-__--.__-- I ____Jl -------- ,- ___ i - - .1I .
I I
11 I I , -_ - ---------
I— --- ----- I -------
7:7 7:o7--
j - ----------- f -------- ------ ------- . . 7 _: I - - I '":
1-111111,11 .1.1-.--.,:,-,:,:,_---,)",..,,,., T---- f ------ --- ------------ -- -------------- i ------------ I -----------------
i 1
4_ --
l
F_
I ------- --- 11111 11-
61+00
11 - 1111.. - _ , - ...l__.._l_l ....I- _l_______ ..... ... ''..' ------ . _ 111_'__ ....... '_'-'" --- 1 ... __ -, __ - 1. - - I _. 1111 - ' - - --- - - -- -- -- - - ._ , ''. 111.1 I - V _ t 1- 1-1 I'll, ---- ". I __' .., .... __ _ "I _ . '__ ------ - - ---- ------ t 1111.. ---"--- ---------- -- ---- - . ___ __.- _"_ " --- I- 4 1 x- -- --- - __ - ___ - __ _ -1111 ------ ------------------- ---- ------- F______ =_'.": --- ---- - - nE:77.7___vw -- ------ -------- _ _4 ---------- ------------ ----- ...... I _ __ - - ----- ---------- ---- --- ------- - - - --- ----------------------------- I------------------------ I , i ------ i_-___-__ ------- ------------- -- --------- ------- ' I _. - I I E 1- 1 _________4__ ---- _ ______ - ---- 11I ------- _ I --- I ---- I .... ......... - - I ... . ..... L .. .. ... '' _ -' 'L .... _1 1111 1. 1 I— . - - __ .... ..... _ _'. --- 111.1 11 --- 11- ---- - ' . L -_ -_ " 't . LL-1 - __ _'_":__. L_'____' "._' __ ______ ------------ -- -1 _ -1 .- _ ----- I ---------------- I ------- _-, i . '_' 'T - - -_ ___ = - ---- _-_=.____ = . I -- - - -- I _= T___' F - I 11-11 I 11 - "I, 11 - 111 .... 1 - ...... _____ . . 1 , - - " '_ -, ..... ___ ' __L_ ______.T_ ,w _'___L_-4_-_------ - '_.. - __-' - -- ----- - - -- - - __ " - ___ - - ' ' __ ___ __ ___ " '_ '-' ' '-"-'-" - ___ ----- ----- ' __ - ---:-- - _`- - _: .' L" 'L ------------ _.____".'_.___'j_'."_:_'.' i:-'-- ------,c --' ----:: --z--.-_-_---_: ----- - - -- ' --_-_- _J! --------- ____' ' ___ __ --- - - - y - ----- --- __ ___ _ " __'l______L_______'__'
11.1 I I 'i - - 1 - . ____ _ _
I _ ___ -- C lr ------------- 4 1 4 ---------- ----------- - ------------ ----------------- t1 ------ -- ----------- - --- ----------- - ------- --------- -------- _11_:__ _--_-. __ _-_ I It-=-==-= ------ --- f ---- ----- L ... - - - ____ -_
I - __::::_ "_-
1-- I --- I ---- _ . -----: _
t______ I __ w__:. . 1- - "'i -L"" " _f " ..... ' .111111I ---- __ __ __ , - , , _ -, -.,- ____ , -, _1111-1. 11 Al 11- I I i 11-1 _11_1111111 . .
I—- Jl . 1 1- '___ _ , ".
4 4F , ,---- ---l--- - - - -_ --- -- : .... t , , _: f - __'__ I -_ __ -_ - - _'.. 4 - -_ - _=_-_ _-_-'_ .4 -- - = - - - _' :
I _ - _ '_'_____ _ .........
11 _'_ __-, _'' I— __ll 11 ... 1 1 I _'. 111-111-. 11__l'.:N'lf - __ - _____ ... .... _' ___ -_ l_______.; i f ----. -- =-IF, I—— x -
t , 7 ------- ----- -- - - .- - i __ . ,- _ ---------- -- - _t -------------- ------------ ... .. -- ----- ------------- ___'__________ ... - ---- ------------------- ------ ____i ti . , I ----------- -- I - - - ------------ - ---------- - -- f r'__________l --- ----------- - ------- --------
2 1 ---- _.'____.4'____.______
I I _______ '_l____._
l ---- ____'__ ---
I—— -1 ---- 4- - I—- . --- 1--l-, ---------- ... _ ..... --- ..... ... . 1 _1__''___."'_.. j ...... . '"'-'- "-"'-'-+- 11 .11 .... .. 1.11 .... 4 .. .... 1 4 11 __ I- 111-- .l.. I—— ______ ---------- - . ____ T1-11-l-..-.-.1--,,1. 1-I.-Ill-1-1. _______A _____ - _ - I E__ _____ -----I-
I .......... .... L__l._ l__ = ill__ __ - __ __ __ ___ __ - - - - - - --- -- -- - A..l__1__ - --- - - - _. . __.. --------- - - _ ___ ___._l_ --- ______.j i II t ____ _ I . 4 I - - ___ --------- - " - i-___ - __-_ -_- i -- -- --- - - ---- --- --''-------------i---------_,:- A ------ - - -------- -- _ _1 -- --------- t--,--- -I"-- - I 111111- -1 --- _ I ----- ... .. ___________'_ 1------.,-::------.---,-,:,,:-.. .-"-,-,, - ---------- -I,- I—— I— 11 1. I— I .- .. I - __ 11 -111, I "I - I 11 1 .... i -1 I I -1 L. I I . ... 1. 1 I I -1 - 1 I ".. - '__ - - - __ _', -, , :,_ _: -"-- ' I , -_ _ ---------- ------- 1. .
I I---- - _____ ------- __A_______ ____ ___ - __ ----- - __ _ _ ----- 1-1 ---- __ --- ------ 4, ___ - -------- - ------- _-, _ __ ...... ____ ._ -------- _ ---- --- ... ____ --- ___ - ____ --- _____ '___-' -_:.::' p !'. I—— 11111.1- 1- 1-11-1 _ ... 11 --i" -1-,.-,--,,l,''.11,11-111".-.!- --- - -- = --- , 1_11_l_ 11 __ - - - I—- - - _ -.-- __l.1'A I I I_ --- ---i- _ - _ -_ --- - -_ - - , .-I, l- - .
I I _ - - - " ' ' - ' -_ -_ _ _ -_ - ____ -1,
I _ . ,:-_--_-,-':""'
L"--'"'-'--"'""""'--,::::"--,--::--_--_-----"-,-,,:--l'-,:-:-,-,-,--,---I --- ------ - ll--.-- ------ -- ----- :7-777w: _:---- A-____ --- I -------- --- _ - ----- - -
Y- _1111 I - -I--_ - 1--- --_I-_-_[': -_ ___i_ _ -1- ----- -_--l'-___='J= ... _'_-_ = _ _ -J.-, J_-_-_:-.-----:- ----- ___Ll ____ F___'._.L'. - _--::. - __1 -I- - __ -1 -----,----! L'L -_ ___--- - _ _. - :L -------- -_ _ - _________-_-_-_[_-_-_-_-_ --------- - 11 _- _:'- -- ------------ ---
I . __ - _'_ f I --------- __'._w_ ,:4 ::_7:7 _.:__:_:_ 77__:___ :77__:_:'__ 7,77--_ -1.1-1.1 I - _ _", - 11 - -1 - -1 I -1 1-1 I _ _ --= --- =_ -------- --------- " -, - 7 ---- - ---- --- -- - -j---.------- - _L___ _____l____'__L______ 1 - - - ------------- U - - - - - - - - - - - - --- ----------------- ---------- - ___i - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - . . . _ . . . . _____ I_ - . . . Ir " ' ____________ - - - - - - - - - - - i ------------ - ----! ............ I,.-----.-- - ____ - - - - - - - - - - * ----- ------- ------------- f_ ___ - - - - - 4 - - - - - - - - - - - - - - I - - - - - - - - - - -, -:::-,--,-t:--,:-.-.-,----. '. - - . . . . I— - -- ----- -- ---- - --- ------- _U_' A_'_ : --L-- . . . . - - _ I I I 11-1 ____
I ----------- ----- I - ------- ----------------- -------- 11 - ----------- T ---------- --------------- ---------- I ---- -::-:--:--::-'_ t- __ ___ -, - ---1J--_:-'_-.-___" - - ".. - . , _.J L ........ """ ' ' ' J' ... . :7:: -:-:--'-:-':: _. :"7::11- :- -'--.-.-'-_ __ 77: ..... :_l_7_7__:_: _' - ------ ------- _ ----- ---------- ---------------- --- . ----- I .- _._'_7__'__ =__:--:q-.':--'--- 'L . ... - ... ..... ;I ------ w :: 07 _: _" :7_w __:""_:7 . ... I I— ... .... I - T - I - - 1. - - 11 11 - -
I __ - 1. - 1-1 --- .. ------- _ _ __ -, - - 1 ------- :7 7:=' p_':7_777_ :_'7:7' :7_1 -------------- --- 6- 1. I- 1. 777-7- ___'__w_':--':f --- - ---------- -- - ---------- t ---- - [.-__- l_-______' L I - .- _' . - _ ' __ '-' __ ' _______: __ __.. it __ I , --- -_ _1 ____ --- :--j-'____: -- ----------- -- 1 ---- I—— - . . . . . . , + _'__ " ' - __ __ - I - I'll, - ___/ - -I----- z __ _ _.___"' 1-11.11 ----------- -- I ------ 11 ___l__ I I :7:m ..... .. .. p _ .... '. 1 ::': - . -- "I". f . _4.' I__ ---- --- - ------- _ - ----- - ----- ------. - . ; --__- - i- - ; --- ---------- f
f . '_ ::-. ''J '=_ ... _7 -_ I -, ' ' - _ ",_ _ - - , :: -.- ':_-"_.:-.' -". :: .. . ..... , ._ -_- -!:-='':J- 11_ I - t_ i I __ _ ----------- ------ __1 -------------- - _______ --- - -- - --- - -- -------- I j ---- ----- #- I ---- I - ---------------- 4 --------- - i ----------- I— ----- _____ -------- -- ------- .-------- _____________ l ___ .--------- . -----_ ------- ------------ ----------- ------------- f ___ - . I _______ fl____l - ------- ------- ____ _1___-.__-_ ------- ----- - 11 .- - ------- -------- - -- ---- ____ . ..... - ------------ ___ ---- _ i . j_ __ :'. :' : ... . . .. _ -
I _:__:.'
l _ '_i_:: . ...... _-_ _- -1-1 ----- -- I— ___ll l-l____ - I -1 --- 11. .... . ....... --.--,. - ---- --- ------ ---- ---- __ ---- ---- _ .'_ J, _:'. ,... _ _-_ ---. 11111-1......' 11111- - - _ - - I __ __ . ____- - 11 _ -1 I -1 - . .1 ____ .- __ --- _ I - I - - - ------ M.l - ------ __ -- ---- ---------- __ -
11 I 1.11--,-.1--,--,11.11-..11'',-.,,,.-Il-,-.,-,-."",.,.,.,.,-----,-"-,-I-,-.",.,I 1.71 _ _7 I _1 --------- I— _"_____l.1_' ___4 _4__-_l_ll_ 1 __I_ -------- :--'--T-::-:-:-__ 'I ___7____ -_ --- I - ------- i -------- ------ - t--= -: ]::--'_.' J - - I _____T__ - -- -_ - - --- - - -______L -------------- -------- --------- - I , -J, EEETEH I _. .11. I— __ - _"' Nf. - ___ - _4 - - - ____ "I.- _ - --------- __ ---- ------ 1 - ...... __ . . . ..... - ---l..'.--.---.-----.-i.------ 11 ___4__ - __ - _____ - - - - - __ - ______ __ _____ __ ____ - - -1 __ ------,---I -- - --- I- I - -, ---- I—— _ I 11.11.1.11, -.111 I ...... ... . .' _ , ___ ....... ----- _._"_L_' I 1_ ------- ----------- ------ ---- - I ------
I ----------------- y
i t
I -------------- L ------------- - ------- L - ---- :__ _'. ___ ------ - ----------------- I e_L= _ -- ------------------ ---- ------ _______________ ___ ___ ------------ - -- ------------ IF --------------- -------- - _ ------ - __ -------- ------------ It-------------- __________ - ------- - ---- ------- -------- -------------- ---- -- ------ ------ ___ ___...___ ----------- ---- --- ....... - -------- - -bWAW:l V- 7____ ___' -------- 1_ ------ -1---l-l- ___ ....... .JL.': ,--,-."-.-Ll-,----.-,-Ill.-I-- - -------- ---- t::__ -, - 7:'___:__T'_' ----- 11 ---- ___ ' -_ - - I . I . .
111 --- ---- A j_____ __ __ ---- ; _________ f I i I I_ -------. - ------- - ------ ___ ---------- ___ ________ _____ 1_'_1__ ____._._Al____ - ___ _____`._' . ."...-I I., l. 1111 11. -.1111.11111.1 -1 _1 ... 11 ...... _'_.__ 1 .. .... I—— _ 111 11-11 1111I.- ____ .... _'_______. : : _ __ _'___' __'_____""______ "---"---" ._l__l_1_1_. ---- l_______'____1_ ....... _'____.__ ---- --- _1 ..... _11I.- -11.1 ... __.__ _. ___ :_p::_':__:j _ l__.' --------- '.'_' ----------- - I 1. 11 -1-1-1.1._ 11 '..". - - __ & __ - L_L L.".___ --"--,----I--.-.--L-.,--- 1-- - - ---------- ___ - --- --- ----i I ---- ------- 1-111. '. ,'.."ll.,,ll-ll.'.."."-- 4 --- I . . I .
T --------- --- 1 ----- '__ ---- ---- __1 ------ L _ -- - ------------- - - ------------- _ --------- __________4 ------------ ---- - ------- _____._______=" I -- ----- ------- - ____l ---------- -- -------------- ______' ____ ----- - ____!_-;:_---_-_-_ --.--.--..'.,-------.--- ---- -- -__'-.----' I . , ---------- ---
t I .-.----.---- _____r________ ______'
I ------------
I 1 - ____ _____ _ -4: - - - - - - - - - - _l_____ ' -- -------- ----- ------------ 4 ------- - ____ ------.----- ---- ---------- -------- ------------- I ___' 5 . - - - - - - - - - - - t ---- I --------- ---------.- - - --------------- ----- 4:=::w4:= --- ------------- ---------- ___+::=:_ - __r__ - - - - ________ - _______4__ - - - - i ------------ --T -_ -: - E:: ==T= - --------- --- -------q- ----- I ----- -------- -t-7-7 _ ----- - - -- ------- -- ---- -------- ____ _________ __ ,- - _______ ___ ...... _+__ = ------- _____+__ __________ - 7777t - ---------- I_ - ----------------- ---- T7-' -_:._r- - ------- -' -_- ------ - I 111 '' I 11 1 I
F________ ___ ____ --- --- 1--_ ----- - - ---------------- _ __ --- --- __ -A - _ j 7:ro:7_7 .__ __ ___ - -_-r:-'--:-: ___ ----- --- _ --- _ ----:---:::--.-!-,-::--::-- --- 11 --- --- ____ ____ :- --- j- --- -_-'.. -.- -=------ __
l_l --------- _________L ------ ---.-. ___________ ---------- -- ------ - -------- y ------------- -- _ . =
17= 7777T== ----- ------------ 4 ----------- ----------- -- ___l --------- - __ - -- - - ---- --------- -------- --- -_ -- I ------ ----- - - - _ ------- __ _____"'_ ... .... _ - I -.1-1111 I 111, 1.11.1111111. "I ____ . 111. .1 ---- IT-
I 11-1-1
I
I I l_l_.J . . E
I------------ ------- - - -- ---------- ----- --------- - .... ------ ' ----- ------ __ ' -"-, - - I i - __ - - I 1 - - - __ - - - - r --- ------ - ---- ---------- ------ --- ---" , -----':--: . ...... - ------ _= - -,-----..- "--"------ ------ _ __-' _: ----- ------ __: _ p__ '_ --------- :_ ___:'_ _t_ _': -,:-I,-,-":----,:t,-:-::,:-::, ____ ------ ---------- __ L_
t 'f___ -1 - - _.____'__ ___11-1 -1 --- 4- _ -- --- I— I ....
1 ------ I __ _7J"'-" "' - - 1111_ 1111 -11 - - pj::_m::: : 7 ' _.::_'_' 1 - ___' wo __7 '_r - :':' _ ,j " -, _. _" - ______ _______J Lffl_y"_ - v_____________': - - -- --------- H=_ ___ _.. l..._ll...._ _l_1_ 111.
l'_._____.' ____ -------- - ___ ------ - . - - -- -:,- - - -- 4----_--_-:- - --- - , i i z [
I r__:__._ ___ ----.--,-, -
L ____ - --------- ._ ------- _____' ___ _ ------------- _ ------- I i I ---------- ----- - - 71 7--7- _t___________ __ I ----------------- --------- ----- ______+___ i -------------- - -------- I ------ ____ ___ ------ __ ---- _ ---- 5 ---- ---- ----- --- !---- - - - -------------- ji______________ _..' --f_=_:_j-_--__'_-_'._-_-: ---------------- , ---------- -----.------- - -- -------- - --- ____ ------- ___I= -------- - -- ----------- 111-111-1.1.1 - 1 I - -1 1_' .1 --- --- "I . 1-1. ' l. -- __ __ - - " - _" __ - I I --r -----I, ZF - ---------- - --- t -------- - - -- ------- ---- -------- -------------- I ....... __ , 11 :-- -'-_-_:-'-lr-_:-- ------ : --------- :_-'4"'-:--.-----T'--- - , t ------ 001 1 I I _. r____ E" I _
fU_)__/_v_ - - -11.11, - - . _ ------ -------- I --------- --- __l____. _ -11, _ 1. .............. _ I -.1.111.11-111 ---- 11 I—, I-_ -1 I—- 1.111, ... I .- ': __ _._ - - - --_ ----- ----- --- _ -_ '__l' .. ,,-,:-::::::::,-"------------ ..._l__lJ --- --- -- .--,,.-.-.,--l.-I.I. I--11---1.1--l----::,-: --- _'_ ----- - __' _.l_l_'_' - '' __ -,",.Is ---- ----- __ ...... I --- __': t - I ' " ____ - --- - - - - - - ____ - --- - _ I - - I
I I ____ ____ - ----- ____ _________ _______
l _____________'_'___ ----- ---- ----------- ---------- -- --- .1 i i-
I I -
I " ' II ----- -
I ---- ,-.-. _ ------ -
1 --- ---- -------- ------- _--
t- . L4 -- --_---_- -
X----,"-- ___ - _
777-7, ur:7 I 1-11-.111 7:7:_' -, 11 ... _11 ..... 1-11, I _1.__ ___________ ------------- 4 '_:7-:t-':'.:_--' _1-- .
I - ------- ---------- ___ --------..---- ------L ------ ---- -- I-- ---:---I.----.------:.:"-""--.---. ---- ------ ------ --------------- ...... - ----------- __'L'_'___'L_-_--:-_-_ -_: - --.-:i-- -- --- --- ' ----- - - ---.------ I— - .- I ,. _ ... - - 1 --- I - _'f tl -- - I I
4 --------- _ _ ----- ------- I 4 _.____4______ -, .--- ----- ____ --------------- == ------- - ------ ------- __ - ---------- ------------ ------------- - _ __ _____ ____ ------------- _ .... - -1- ---.-- -_-_-"----,-,-,-i------------ =.-------I---------------.---- --- - lf-:-_-:l ... -' ... .......... .. ..... .. -J' 1.11 I _ 7::__7::__.'__ __ - +' __._'__ .... ___.____.___T_'_ -:::t-.:-:-:,-::,-.:W:-------.-:------- . 1-1-1.1-1111- ____l____+ W:_:: _w __:__:::'.w::: _:__ __ ------ 4 -------- ------- '----- - -------------- I"-----'---- 7-7-1 ----------------- ----------- +__ -------- ____4____ _f__l_____ 1 . 1-11-1 I -1-1 111 111. -1 11 ------ I— _ Tf 1 I ' ' 7 ' ". -
I 1. 1 --- i --- ___ ----..---,.l',,,,-.-,--,",.-,---.-,-,- - - " - - - - 1111. _ _ _ , x 0 . I I . I 1, - ' - ' _ , '_ ... " . __ - _
11111 .111- ____l _ -
I _,__. I— -11- 11.1-1-4 - -- -- -4- ___. ' __ .... ------- ... - I , l_._____._____ ----- :::.-_---: - -------- - --------- - ---- --.---- I -- ------ -- ------- . ___ - 1 --------- - __ - ---- --14 - --- ------- ----- ------- ----- - I __ l_.___ ____ - __ 06_____ ____ . a I '_: - ... __4 . ..... ---- +- - -- _- - _ - ----- -- l__ - ------ ----- I ---- . - ----- ----- -- _
llf ----- ------ .. ........ . . .___.____ ---- ------------ ----- ----------- --- ----- __ -- --- -- _ : - I . "_: Hm - _11 II- _1 . ..... __7:o t - - - __ 1-1 .1 - "l' .- - , , - - '. , , , , " - _' 4 ------ _ ------ --- -- ------- ------------ --- - --------- ------- i_;;;_ ____11 ----------- ---- --------- - ,-_ _ __ ----- e ------------- I ---------------- ------------- ---- ------- ------- - I—— ------------ - ___ --------- ----------. ------------- __________ ----------- j _______ I t -- - , - -, - 1, - - , -, .... .. , L .... .... .. _ ... _______. ------- -:- _: -- --- ---- :=T__'.__:__.7 :_:---1 -- ----- ----- ----------------- -------------- f ---------- - ------------ ------ ---- ------------ ---------, ---. .__ I __"Al --------------- 1 ------------- t r _ I _ 4 --- - ----------- -------- -------- --- ----------- -- - ----------- ---- 1 y I1 11 ' I ------------- ---- --- ------- + I ". ".. .l. "ll ' 4 -::,: j I __: I , " _ _ - ............ - ----- - I - - 1-1 - --,'ll,Ill"-'"'-----,-,----lI - ----- I-------- . _l___._ 1.1-.1-111 11.1 ... ....... I—— - - --------- ------------ --------------- _ __ -------- - 11 --- If -- -- --- I— - - -- - -- --- - '__ i7:7__ _: :_ ---_:- - - __'7: -':::-_---_-J:--_-.- _. I--"--: I—, _11111' 1____._ ..... . _'_
11_ .---'--"-'-- "-'11-'-'-I- l'l ... L"''-'-"' I- =___ _ --_ ------ I --------- - --- --- ----- :: : I . 1_1_1_11.111 -, "I ---- 4 ' -1 ___:_ ---- 11 T -- ---- II—— _. _1 _ _____ -.,-,- - _ - _. - _ _ .. .... . __ __ _ j . __ .
f, . i - _'' _:: 1-:_-: -, ::: -, _'__" -
i" - _ - - ______'_i' " _ -_ _ ----- ----- ___ - ------- _ __ - I1 ---- ----- I --- ------- - __ - -:- , - - - _ ----- ___: -------- - :_-.-'-_-'- _-_-:l_-__-___i___ ----------- ----- _ ' "" "' ---- - -- ------- - _ ! j I , , :_ ----- mAl r'llp.7 ----- - ------- -
I ------- _._____ _'__ ------------ ---------- ___________..______________ ------ ------------ ------- - --- ------------ ----------- __________'_ l ----- ------ ____ ------------ -------------- _________. ----------- - -- I : ____ I --- - --- ------------- ----- -------------- - ------------ - -------- - - -------- [ ------ ------- ------- 4- - --- -------- 4_____ -- -----4------ ------------------------ i ---- - ------- - - -- 1 _ - - - . -I - - ; - .- _ != -------- 4--.--. ____
I --------
4 -------------- -- f I qI IJ= - ______14_ -4- =1=:= I I z "MA I .
r- - _-------------_____ __ . - - - ___ - - . --I-- -_ - - __ - =7::77:t:777=j_ - --- I,-
77777r= =-- ------- ------------------- - --- --- I ------------- -- 7 -------------- _l__ ---- -- - ---- -- __ --------- I—— ------ _ __lLvl_?l L ____ - ----------- - - i ___
t__ I __ I
I ____ - - ----- - _ +
i tf=7 ___ l-:
1, I ------ ----------- -, - -
I- _'__ - ' ------ -_ _? --- ------- - -- ------ ____ - - 5I --- 1. I - I 1-1-1 "I I " Ill ------ :
j_ _ - -, -- -_ -, - I
I ! ' l ----J- ,
11 I 1_11 ". I 11 I I I I Ll F - - __ ----- - . --- _wr_::_:: _ I., I 11.1 _l 1.1. 111 _' __ i - .. " I - ___ __ ___ _111111- -, ._:: L:_: -11 _1__'_ 1 I—— ---- I - -- --- - ------------ - -- _ -- - ---------- _ _ --- J L -- ----------- ---- I__ ----- -- __________! -- -- --------- - ------------ - ----+- _ ---- __ l___:_.:__': :__: .1-1 _:"'.: - ---------- _ - ' =
1- ____________.______'_ --.---f,--,.------.-------------------------Z:::Z:;; . __ - _ t __ __
I , -
71 ------ ------- ------ ------- - ----- --------------- _ ------------ -------------- ---------- a ------------- -- I ___ . --- 7-7 - -
1 - 11111 4 . _ -
IZ- _ 1 --- I---- -------- ________ ------------ -------- - ---------- ___ A --- ___J_ ... _ - ! i
T':-':-"--'-: ----- - - "' - '' ' '' ... [_'__ _'___ "' - "' ' --- " ...... " - " I" I." I" " I" I I I __ I __ '17, ;;--,-"-:,_-:-:-::I.-.---:-:---.:--:-11. I ------------- II --- --- I--,------,- , -7, 7 ...... 7 - - i- - 7 - - -: _. w _ "--- __'_:_'__'_f' --: ----- - -_ JF ------- ----:-!:,-:,----:--1--:---,---::,I---::- ..................... .. ........ . . wrffmrr='._'l ------ I_- I Ill 1 t_' . 1 ' n ------ __ ------ - ---------- L --- - ----------- 4 ------------- -1 ------ Ii .1I— - - -
I I .,=------ __
l____" _ ----------- ... - --
1. 1 -- - _-t_'_-__-.-__-__ -, -_ - ____ - __
I
I ---- .__;_;._;;___'__--- m_-_ - ._ ----------------.- -------------. --------------.-.-.-.----- ______._ ____ --- --- ----- ---- _ _-_- I-------
j __ -------- !---.-. --! "
1. ,
I
r== I , 77.': 7--" ----- 1----_='-- -:-'-_'[:'-':: ... I --- I—— .. .1 :--::----l,-,---.-,-, :7':7___: .'77__.o______' : -_ -, " ------------- l_____l ---------- ------- -- ----- i i -- --:.
I _'_':_'_ 77 -4-- '_ - 7 7:7:71L-:--- ------ -- ----- ------ --------------- - -- --4--- 1_1__._____.'7w -- -------- I-----,.-- - _ - _ ,
I __ _____" ". I 11I - --_- r'-1-1------7---- .... .. . ._'_:w 77 --:---:::--i--:.-,:-,,, .-:l ----- :------' L---::_--.I' i --'-'-' l' . ...... 1._.l.._. .. 1111I.- 1-1111 --- 4 .- - . ....... _ I! - =-- __ i- , '. 77---- -"r----_-'-:--' -:-'-----'r:-_-: __ I I'll, I 1 1--l-l- "---- I l______._.l______l___ "_'____ 7_1__ - - --- :--4,7 _ _. _. __A_ __ 1 , 4 _,' : : I I __ _ I'll F I ----- _z \ __ - _ ; ''.. I - 11, __ - __ - I .._ . 1, _1 _lt___---l_- - ---- - I ___ -.-- __f___ ____ _ I - - -p- _________'_'_____________ _ -------- - --- 3 i t _.___. I.--- ----
f___ ---i,-. - - __--____ .-I - - - __ - a L - ___--m* m=___T_ : -4- I --f- - ____'4__77t=_ __ L_
I I _ - _ __ '. ____._ .. .... - - -
I L L _ _ _r a --- - - - ... .. .. L 4- - -------
14- - __i - -------- ----------- -- i=t=f= I ---------- _ ------- - - ------ t ---- ---------- ------------- - ------- ----- y , r -- ---- ' ---------- - -- __ - 717- jT 771:7i_____* , 1 77:___'7 -
1 7 cy:___'o_'_' ____7:_. -_ 7 i -
ll' 11 "I'll,
4 - --------- - -- ------ ----------- ---- ---------- ------------ _______ ------ - - - n==== . I - - ------+- ts; ! ------- ... ...
I ---------- ------ r -------- ---- -------- _--i : _ :--. f--=--- =--- _. _. _ I _______ ____.'____ ____ _ --------------- ------- -------- _1 - ----------- t ------ t ------------- -- - f --- ----- __ 3 I - - - 77 :7 __ - 4______________+__ --I'------ :
I ------"-,----------------------"-----------,- ... ___:: - -------------- I—- ... -, 11, 11 I ' 1-11'..' __ , ------
i --- ----- ----- " t 111 . ---- ----- --- . - ------------- .----- ____ - - __:___________"_ .. 1-_--_--':-.- -_ IV— ------------- 14 --+--------. r-1 11" - I I , ___ . i ., -, __ 1. "I .l. " _11-1_1__ 1, . '___ ...... _.""." " I— ____l'_l 1 - l.l___.l_. _11111. _f.11Lll_"' I'll 1 , i - - . -
1 1 I I - I 1 I- - - _1
I w: - --- i 11 -1 - I I - _'_ ' __ I . I ' ' r- - -_ - - ",_ _'_' ' -,--=,-" -. _ __': ," ___ I =_ - - . --;
4 1 1 __ __ _'_ =_ - ' - - - - - : '__ _:_.f_ --- - - - -- - I ; __ - - - I . ..... _ __ . __ 0IL . m , - - i __:'L ' i ' i 9r -I'll __ I - - Y -- ----- ----------------- --- I ------------- - --------- ---- _____l --- ___ - ----------------- ---- - ------ .- ------------- __________ - ----. _ -1 --------------- I - ------------ ! ---- ------------- -------------- - - --------- ---- ---- -- --------------- ---------- -------- ------- ----- ---- ------- --------- - ::_.li__l__ ------- - - --- ____________. - ----- - - - ----------- 95 _7 -- - ------------ . . * - I
111
v _ .... N
I
I :- ... ::-': - -- " -
1-1. _. 1. -, _. __ -, -1, " , I 11.11 .J_1_1__l ----71-- 11 __ 11 11 I II -, __._ '' . _', '' __ - --- - - ---- I------- - ____ \_l___'______= - --------- --- -_ - w? L' - __ -'- I—- - 1 11 _____l. __;.w - __'.1. 11 _ 111.1.111 11. 11 _ll'4 ............. ------- L '- ... 1' - ...... 3 " - ---------- + - 4 - - - - __ 11 - - - i -
ll -------- ---- ------- " ---- ---------- - ---------- _________ t----,--,- - - _ ------ I ---- 'I"' - - 11 i ' ' ""' -11,11-71 --- I -, I I ' - "__ - __ '_"" ' ""' "''_'___ - --- - -- r __ " - "'_ __ _" ' ' ' - . - 4-- __ __ - --l- __ __ - 4-- - - _ -- 4 - - +_-, - _---____" . 4 , 47, i ' I . . : . I . _ " - I I
1.1_ ...... .. , - _ - , _ ...... " __ , ____ -- ----- -- __7 ------------- --------- r ------------------- w_____ ___ ___ - ------- I ------------------ ----------------- ---- ----------- ---- ---- - __-; --- __ ------- ------ ------- I ----- - -- ---------- X _ - -------- I ------------- ------------ I --- - --------- ------- ___ ---------- i- ------ - - - -1 :_:____l.__ ------ ---- - - ------- ----- - ____4___ _ -- --------- --------- .1 -- --------- _________?_ I I '_____l ----------- - ----- ------------- i ------- --- ------------- ___ - --- ---------- - - --- - --- ---. 11 I
I ; ---- -- - _ I , T-6-71 - 77 I _'_ 17-77-'=
I - -1
im li - -l - _111 ------ I - ----------- -1 ------ __ r ,:--"-r ----- - -!---_-- ... :': ---- -1r--.--:-:-':-'l-. -:7:7 11 _____ ' ___ 1- I ---- .---- I --- --- - -1 -1 I - I—— -1 I 1-- 111_11 -.-. - 1 - I . . ..... ----- - -- __ .... -
1 111.11 11, --- 11 _l_l 111 ---- 11 1 I 1-11 . . ...... __ ,. , , _ , _1 _ :7 N 41 - I - --- fIli I _ '', - 6 .= - 1__.l-+__ ... --- i I
i - - '1'=:.-_'-l_'_'.___'___ , ---- --- - __ _= _____ _________... ------------- -------- I "' i ----- ------- --- --------- -------- -- ------- --- -------------- Ir --- --------- ---- ---------- - I ___ _ ---------- I------------ __ -------- ---- - ------ I -------- __ l'-__ -.------------r-------.----..- i ___ ---------- _ __', __ --- I ---------- . ' - --------- ---- ___' --- - ---- -- _ I ....
I .
I
it
I - ' - __ - I— -1 --- I
I . ; I r I 2 .
1 I.., .1'_ _ - ___ , . " , ... .......
I i
11.111111111 ,,, ------ _ ------ ------- 1 --- ------------ f ------- - ----- - ------ ' ____ 1 ___ ------- 11 .'i0.':_.______ ---I ------------- 2 --------- -, I ------ - - i----- - ----- ------------ i -------- --- - - ` -------- __l ------ _ ---- -_----_---j ------------- -------- ___ ----------- ---- t --- ____ 1 -'------- --- ---------------- - 11 . ) `
yl___-'\_ _ - ---------- 1 - ----------- __ ---
I— 111- I ........ . - "
w___' ._ ... ___4_ _ '"' 0:o 7:_'_'_' . - "_____l_: ___ __.-I.11 _ .1-11.1 .A.1-1 F7 JVSh- . L_ ------ ___ II I I I -, I - , I I _1 ... _.l'; , '_ - - I __:_':_":_'_ ----- ----------- ----- i''_" 11-1 -1 - -A - - t" ,-,-, -, - - " - - - , , - " "- - " -- " , , " - , '. -' , - - - ..... ...... _ _ -- ------- __ ........ _________ 1_111- I .1 --- 111 -1 I 111 - - ..-- -
t ----------
I --------------- - ------ -- ---- --------- --- - - -,-,-,-- - - _1 I - - I '_ "" - -"-- " _'_ '__ - - i - -, - ' _" -"-, ' ' "" -, -E -7v _ 1__ ____ ..... . _< 1 - --------------
t ----------- ----- I --------- - ---- J Z
I I— -
V _=_: =_I___- z -
il , ,
o : :; q
l___ --------- I ------------- --- -------- ------------ L --'----- ------ --- ___ --- _ _'_'. - --- ---- --- -------- -- ------------ ---- __ll ----- _ .... A --- - ------- _1 -- -------- __ _____"'.__ -------- -------- ----------------- 1 -- ----- zzi _______4l__ I - , -:=-- i I . I . I -------------- -------------- __________ - -- --------- ------------- ------ _ _____ --------- ------------- --------- __4 ---------- - I-, - - ----------- --------------- L -- -- --------- _L_ __4'______ - - - __ -------------- ----- - _____L 4- z=Z= - ------4-,-- _ -'- - -, - - - -------+- - - -"- - - - - f - - t I----- - - - ------- . .
I -- ------- --- ; _________
I I . I I "'i
11 - -1 --- I
t _______ ____._ --- I ------ - ----- T ---------------- 4 - - _____L I .
1 - - ------.-------- ------r-- _.__ ------------ --- -- _____+____ ---- i - - ---- 7____ . I I - _____________________r_________ . I rh ------ __- .. - i y 1 1 . i- ----y --- ------ I --------- ____ ____ __ I . H _= ----- 1: 7'7'u77_::: j7::_7: 1 ... - _L t -- -------- --- -'-'!'---___ A_ - --- --- I - --."., --
l-Fl, ___ .'
A_.Al_A_ __ ____l.___.l____l_ _____ __ - _._ I 11 I i . I ------------- . I - ----------- If ------ ------- ----------- ___ i=_ ...... .. . I i _l , ' 4 -------------- - ---------- ---------- ----------------- : --..---- ____ ------- ------------ -------- ---- - -- ------- _____ ____ - .____l I ------- _____I_ ------ ------- ---- - ------- ------------- I .1l___ .- - 7_ _:_
l__ --- - --------- ----- - --------- ------- ----------- -- ----------- __ 7 ---------- 1 - ------------ =77t -------- :-'f:-'::--.:-: ---- -- ___'_'__ ::-.7.------::i,-:--:--.-,--.-. ------- -+------ _ I I I IT --------- - - -- - - --------- --- + -------------- ------------- , 1 --------- ------ ---- ---- I -.:t ------- 17, _ I -1. --j ---- -_---'71. - - .. A : _: 7:: 1. m7._77:77, ----- --- ------ _'::7: 7777:7_ 1.11-1-1 - I .._'__'l" - 11 '- . I., , __ .. . ... _.- Al"
l- I ... . I __ '- ...... . ... . " .... . . .. ...
I '___ ____
I-— .. _.", , ___
I - - - __ __ !__ - _ _" --
l- 11 ---- i I __:= I— = ""' - -,
I* ------ ----
I- Ill— "I - I , ,
I - - __Lj___'__'_= I ' " " - "' - _
I- - ' - ... -.1 --- 1- If- I - 11 I—, ---= _'___ i"-_-__-w _4-- - , ------ - ---- ------------ -------- ----_ _ __ _ -.----- _____________ -------- --- ---------- -- --- - ---- - --------- ---------- _4 ----- --- ____ - - ----- ------- ---I-- - - ____ -------- ----- --- .------------.-----.--- _-A- 4 ------------ -- j____-______'J - - -- - __ --- ___ ___ -- - ----- ----- I_ - f ---------- -------- - ---------- t --- -------- ------------ --------- 4"'_"' -_-p - .--- - .-I-__-- --------- L-__= --- - --- - l_::__ ' - - - ----------- --------------- - ---------- ------------ _______________f__________ - ---------- _'___ -----,-----,__-__.-_-=.-4---,-------:=-,=-!- ' I :7__-_______._: - F ---- -- ---- - I 1 ---- ____'__ I- _l_ I----- _i _.'4'm:p_ __±_-: ____ '___77:' ___7 w -- --- - ----- !_' __77D[___.___7 I., .1.11 11 1 ------- ---- j----- 17___'::_ ---- f ------ -' --:--'-:--t- - -- - I -----.-.I- _______ _ I .".. '______
ll .
1 - 111-- i- J- _--_- , [ __: __j:-:H__-':-'_'-[:-' --- :--:- . ________' ---- -- :: ____ =77, ______ ------ ---------- - ---- _ - ---- --- - ----- I ---- --- __'_; 11-1. 1. I _::n_ :77''', 7- ........ ..... __,". - - - --3, ------ _ __ -T_ .... . ... .... l._____._'.j____-__ +1111.114 ... 11 _. . -, -4 I— - !__ ----, - .-- _ . __ - - 7. - :-, -:----- t,-- ---- --------- ------------ -------------- :7- 1111 I - - ----- --- _ -, - __
1_11-1111 -- ---------- - -- ----- - . I I -------- --- ---------- 11 -I--- 4----- _'= ' -- ------- -------- __1 6 . ------ ---- ----- ---- - --------- --- , __ ___ ... .. ...... __ ----- - 2___..,________l __ ----- -- - -- ----- ____ _____
I --- c ------- ' --- _ : --- :-- ---- - ----------- ---- --
1.11 1; 1 ------- ________7 ----:- -.7--.1-7- __l___________7__ 7-: ------ --- -- - --- ---- -----------. .-------- fr ------------ - _1 J .. -- _11 ,- . .--. ___ __ _ _'__ _7 _7 - ----:----- - 7::77 _ 11 I", - - - I 1 ... - , I ' . ... .... - " _1 - !--- - __ - . - '_ , ' , ' I I -1 1-1. l I _ I - - I - I . - " --- . __ _'. _ __ _-L _______'z _ ..... - ----- - -, -- , -, - 1 .... 1. - - -------" --:-. --- 1-- I—— --- 1. ,1-----== =---- I 1 11 11 I I - - I ______A - - , " 1- " -- ---- _.. - __'1'_" __ - ' " " " -- '__ L_' , -1 11,11, 1-::-:- (--:..:--,-,:,----,,----,,--, 7_':_-_:7_:_ 1-1 1 _1 - -111. 11-11 - 11I - _. - I _ 11 -1-1 - - I - - I- _.- i _ ____ - __ " - - - . .. ......... - _ -, - ___ _J _ , ,.- - - - - ____ . ..... . ---- - ----- _ __'_______ ______ - .- - _ - . I ___T I - ---------- 1 __________
i ' "" . -1 I I
7= - 4 ------ - I i
j_ _ __ _ , ..... ..... -, - - - 7":'7:_::_::777:-! -------------- -- t -------- : , ' _': :_ - I., ':J_ , _ -, ' = .--- ____ ---------- - - __ ---'--. -----: I_ - - - 'JIL -_---_--_--Jt - - - - ----=L-= -.-. _ _'_'_= " ----------I----- __ 77r7T._____________` = ___ I t _ __::=___t______ -, I ---,!I---- -"---:-- - - __"__L_____-j I - --,,,-- 4 -- 1 ------ f- --_ ------- i
i L 4 _..... -------- --- t L_ -- - --- I -------------- 4 --- ------- -- _§ --- __ __ - - __-_ - L_-_-_ ------t-- -_ - : i , ""- , " , ---" , -- - __ w I - 4. _.
i . ... . ... ... T ------,--",-- -----,---"- - :-:-_:7r-':-:' :w' '__=J.--:: --- ---.: ____.'__J 4 I =77 71_ .:_-,T----"",,-"------,-" l'--,-- __
11-1 _1 I _.___._ ."-.-,.,,- I— ""'- ''S"' ' J ......... 1 J -, -. - __ If-_---_-'. "--- ---- -- - --'------- -,--- f - - - , - _ --- - --- v _ " '__t ._: ,: _ _' - _' c'..=-"I.-"--,-,,_jl-' - _J: " _f - ____ - - --- __ L_ -1-11-1.. 14, _ j_ I
i .
I IR
t ---------- I I'll,
t -----------
4 -
T ---- I --------
I
t--
111.1..- 1....., II
1111, -4_ —
I I - 11 A I- I --- I
PROFILE SCALE
11'= 41
VERT.
1 $.
I =
20' HORIZ.
Zo n+ 00 ,00+00 /V - ,_ 600C0004 '
d+00
I
1+00 - " In BAR 2" X 518" X 8.25",DRILL
0 3/4 VIA. HOLE FOR 518 HINGE BOLT
a
a
W. DAMAGE BOLT TO PRECLUDE REMOVAL
6" DIA HEEL DRAINS TO
DISCHARGE THROUGH WING
0 OF OUTLET HEADWALL . 1.25
0- A 11 0
1TYPICALTOBOTHSIDES .. ." BAR 2 X 318 X 2.5
11 OF HEADWALL 5_6 " . .. d' . . - (
WITH .31144 DIA. HOLE (4
I-- PER BARRIER REQUIRED) w I . . A - I . ' . ,
4 4 : . :. . - - , 1 60" RCP SEE DETAIL A HEREON :'.. * . - . *,`' ] to I 4
3'
V-1:
I . .. . 1E= 407.20 1/ IDIA. STUD EXTENDED ..A .*
4 • • - ' _ *
TYPICAL) J" EACH SIDE BARS 2 - X 112-
N PROTECTION BARRIER
W_ I
PROTECTION
ROUNDED PIPE ENDS PER SDRSD D-61 BARRIER
S TORYDRA III LINE DATA _
BEARING DISTANCE
L S82 "45'19 "W 119.36**
L2 S2824 $ 17ME 105.12" -
LJ S48 4 1'22 "E 26.17'
L4 S0774'41 "E 5.46' Cl
I S172138
p so
W 1 31. 81, 1 C2
STORM DRAIN CLEANOUT TABLE
TYPE STA DIA X Y Z v
8 -
7 4 8 9.42 --
7r- is , ------ r
B6 62 +93.35 60" T_ 6' 7' 14.74'
S TORYDRA IN CURVE DA TA
DEL TA I RADIUS I LfNGTH =TANGENT
I
CONSTRUCTION NOTES
I
1 CONSTRUCT 18"* RCP STORY DRAIN 1350 D MIN I I
CONSTRUCr 60" RCP STORM DRAIN 1350 D MIN
11 CONSTRUCT CATCH BASIN TYPE F PER SDRSD D-7
I
1-6)-CONSTRUCT 60" WING TYPE HEADWALL PER SDRSD D-35A"DIMENSIONS W I E, F & L MODIFIED PER DETAIL IL HEREON Z
Q
9:4
v4q
4'
C_
BARS 2" x
6" 0. C.
lQ_
lit
m-
AN
11 IN, t
41-4 11
1*
I LA_
Q-, I
I"-
I
J' -6"
E
6' " 2' -9"
DYING TYPE" OU TYPE"
60"
DETAIL A
NOT TO SC"
4 ZF
0 5.
7 , 4.' 5" '
1 0.
5 "' . ' .. .5"
a-
DAD 7" V 7 /Q" V 17 AZ"
0 _/ . 1.%.,# Lf%'" 1.71UL Ur VMWAIL[AI/ EXTENDED ,-, 4 .. . 4' '. 12 DIA. STUD EXTEN --- a- -.N*-
6 J" EACH SIDE . . - .< " 5 16
4 - _§
Z Typ.
ez
X 112- BAR 2" X 518" X 8.25" WITH .
4 . - .
4 ' -_
BARS 2
112 "DIA. STUD DRILL J14'** DIA . . . . A _.
HOLE - PROVIDE PADLOCK ----- - 4. < . . in
4 q
DETAIL B
TECTION BARRIER
NOT TO SC"
NOTE:
CONTRACTOR SHALL BE RESPONSIBLE FOR RELOCATION CO-ORDINATION OF yp. ALL DRY UTILITIES REQUIRED.
I
DETAIL B HEREON CONTRACTOR TO PROTECT IN PLACE ALL CITY OF VISTA TRAFFIC SIGNAL CONDUITS, STREET LIGHTS & STREET LIGHT RUNS.
WHERE SOG&E ELECTRIC CONDUITS ARE IN CONFLICT THE CONTRACTOR SHALL CO-ORDINATE WITH SDG&E To ADVANCE OFADVARELOCATECONDUITSINL-1/1 V/-1 yp. THE STORY DRAIN CONSTRUCTION
WING & "U" TYPE HEADWALL CITY of VISTA
RUT&UHUN RARMAK DEJAILS
SCALE: 1 -
0- I VEMENT PLANS FOR.• 4
I I
CONSTRUCT CONCRETE LUG PER SDRSD D-63
I .....
33 CONSTRUCT STORY DRAIN CLEANOUT TYPE A-81 PER SDRSD D-9 I
PREPARED IN THE OFFICE OF.
4 I''?REMOVE PORTION OF EXISTING 84" RCP STORM DRAIN 7601721-2000 ll
11 11111111;
111 ....
F
43 REMOVE EXISTING HEADWALL
I
I - '
11 B UCCOLA
lllz___CONSTRUCT STORY DRAIN CLEANOUT TYPE B-6 PER SDRSD D -10 AS -BUILT ENGINEERING, in c 72 CONSTRUCT PROTECTION BARRIER PER DETAIL HEREON
I
SEWER IMP PLANS ADDED & SHEETS RE- NUMBERED i tl Ll I I 311,Z,,, vista Way, Suite 301, Oceanside, CA 92056 41 '
4_::
0p
27732NO. DESCRIPTION CITY I DATE VID, I DATE & " **%00_0r_ 1O• it 111.
APPROVED CHANGES ENGINEER OF WORK RCE DATE
COV REVISION. 911512004 1
F:\223 TWE\01 VistaRedev\dwg\2231-i-sd-12.dwg 2/21/2013 8:53:35 AM PST I
SOUTH SANTA FE REDEVELOPMENT
DRAINAGE PROJECT (CIP-8001
eFS STORM DRAIN LINE N, N-1 & VC- BL/
0 1
q _r -k
jp APPROY6
ND M 55075 6-30-0 S
Uj No. 27732 m - SHEET 12 OF25
Or_ _ l%j for CITY ENGINEER RCE EXPIRCS D
L Exp. 3-31-12
p BENCH MARK: STATION 2063 IN THE CITY OF VISTAx
C IV I\- NETWORK, ESTABLISHED BY RECORD DWG -3979
OF SURVEY NO 14023
0 CN \ LEV 359. 22 (NGVD 1929) .
LN 2009-025 VID MAPS F15, G15 & G716
STORM DRAIN CLEANOUT TABLE
TYPE STA DIA X Y Z v
8 -
7 4 8 9.42 --
7r- is , ------ r
B6 62 +93.35 60" T_ 6' 7' 14.74'
S TORYDRA IN CURVE DA TA
DEL TA I RADIUS I LfNGTH =TANGENT
I
CONSTRUCTION NOTES
I
1 CONSTRUCT 18"* RCP STORY DRAIN 1350 D MIN I I
CONSTRUCr 60" RCP STORM DRAIN 1350 D MIN
11 CONSTRUCT CATCH BASIN TYPE F PER SDRSD D-7
I
1-6)-CONSTRUCT 60" WING TYPE HEADWALL PER SDRSD D-35A"DIMENSIONS WI E, F & L MODIFIED PER DETAILIL HEREON Z
Q
9:4
v4q
4'
C_
BARS 2" x
6" 0. C.
lQ_
lit
m-
AN
11 IN, t
41-4 11
1*
I LA_
Q-, I
I"-
I
J' -6"
E
6' " 2' -9"
DYING TYPE" OU TYPE"
60"
DETAIL A
NOT TO SC"
4 ZF
0 5.
7 , 4.' 5" '
1 0.
5 "' . ' .. .5"
a-
DAD 7" V 7 /Q" V 17 AZ"
0 _/ . 1.%.,# Lf%'" 1.71UL Ur VMWAIL[AI/ EXTENDED ,-, 4 .. . 4' '. 12 DIA. STUD EXTEN --- a- -.N*-
6 J" EACH SIDE . . - .< " 5 16
4 - _§
Z Typ.
ez
X 112- BAR 2" X 518" X 8.25" WITH .
4 . - .
4 ' -_
BARS 2
112 "DIA. STUD DRILL J14'** DIA . . . . A _.
HOLE - PROVIDE PADLOCK ----- - 4. < . . in
4 q
DETAIL B
TECTION BARRIER
NOT TO SC"
NOTE:
CONTRACTOR SHALL BE RESPONSIBLE FOR RELOCATION CO-ORDINATION OF yp. ALL DRY UTILITIES REQUIRED.
I
DETAIL B HEREON CONTRACTOR TO PROTECT IN PLACE ALL CITY OF VISTA TRAFFIC SIGNAL CONDUITS, STREET LIGHTS & STREET LIGHT RUNS.
WHERE SOG&E ELECTRIC CONDUITS ARE IN CONFLICT THE CONTRACTOR SHALL CO-ORDINATE WITH SDG&E To ADVANCE OFADVARELOCATECONDUITSINL-1/1 V/-1 yp. THE STORY DRAIN CONSTRUCTION
WING & "U" TYPE HEADWALL CITY of VISTA
RUT&UHUN RARMAK DEJAILS
SCALE: 1 -
0- I VEMENT PLANS FOR.• 4
I I
CONSTRUCT CONCRETE LUG PER SDRSD D-63
I .....
33 CONSTRUCT STORY DRAIN CLEANOUT TYPE A-81 PER SDRSD D-9 I
PREPARED IN THE OFFICE OF.
4 I''?REMOVE PORTION OF EXISTING 84" RCP STORM DRAIN 7601721-2000 ll
11 11111111;
111 ....
F
43 REMOVE EXISTING HEADWALL
I
I - '
11 B UCCOLA
lllz___CONSTRUCT STORY DRAIN CLEANOUT TYPE B-6 PER SDRSD D -10 AS -BUILT ENGINEERING, in c 72 CONSTRUCT PROTECTION BARRIER PER DETAIL HEREON
I
SEWER IMP PLANS ADDED & SHEETS RE- NUMBERED i tl Ll I I 311,Z,,, vista Way, Suite 301, Oceanside, CA 92056 41 '
4_::
0p
27732NO. DESCRIPTION CITY I DATE VID, I DATE & " **%00_0r_ 1O• it 111.
APPROVED CHANGES ENGINEER OF WORK RCE DATE
COV REVISION. 911512004 1
F:\223 TWE\01 VistaRedev\dwg\2231-i-sd-12.dwg 2/21/2013 8:53:35 AM PST I
SOUTH SANTA FE REDEVELOPMENT
DRAINAGE PROJECT (CIP-8001
eFS STORM DRAIN LINE N, N-1 & VC- BL/
0 1
q _r -k
jp APPROY6
ND M 55075 6-30-0 S
Uj No. 27732 m - SHEET 12 OF25
Or_ _ l%j for CITY ENGINEER RCE EXPIRCS D
L Exp. 3-31-12
p BENCH MARK: STATION 2063 IN THE CITY OF VISTAx
C IV I\- NETWORK, ESTABLISHED BY RECORD DWG -3979
OF SURVEY NO 14023
0 CN \ LEV 359.22 (NGVD 1929) .
LN 2009-025 VID MAPS F15, G15 & G716
S TORYDRA IN CURVE DA TA
DEL TA I RADIUS I LfNGTH =TANGENT
I
CONSTRUCTION NOTES
I
1 CONSTRUCT 18"* RCP STORY DRAIN 1350 D MIN I I
CONSTRUCr 60" RCP STORM DRAIN 1350 D MIN
11 CONSTRUCT CATCH BASIN TYPE F PER SDRSD D-7
I
1-6)-CONSTRUCT 60" WING TYPE HEADWALL PER SDRSD D-35A"DIMENSIONS WI E, F & L MODIFIED PER DETAILIL HEREON Z
Q
9:4
v4q
4'
C_
BARS 2" x
6" 0. C.
lQ_
lit
m-
AN
11 IN, t
41-4 11
1*
I LA_
Q-, I
I"-
I
J' -6"
E
6' " 2' -9"
DYING TYPE" OU TYPE"
60"
DETAIL A
NOT TO SC"
4 ZF
0 5.
7 , 4.' 5" '
1 0.
5 "' . ' .. .5"
a-
DAD 7" V 7 /Q" V 17 AZ"
0 _/ . 1.%.,# Lf%'" 1.71UL Ur VMWAIL[AI/ EXTENDED ,-, 4 .. . 4' '. 12 DIA. STUD EXTEN --- a- -.N*-
6 J" EACH SIDE . . - .< " 5 16
4 - _§
Z Typ.
ez
X 112- BAR 2" X 518" X 8.25" WITH .
4 . - .
4 ' -_
BARS 2
112 "DIA. STUD DRILL J14'** DIA . . . . A _.
HOLE - PROVIDE PADLOCK ----- - 4. < . . in
4 q
DETAIL B
TECTION BARRIER
NOT TO SC"
NOTE:
CONTRACTOR SHALL BE RESPONSIBLE FOR RELOCATION CO-ORDINATION OF yp. ALL DRY UTILITIES REQUIRED.
I
DETAIL B HEREON CONTRACTOR TO PROTECT IN PLACE ALL CITY OF VISTA TRAFFIC SIGNAL CONDUITS, STREET LIGHTS & STREET LIGHT RUNS.
WHERE SOG&E ELECTRIC CONDUITS ARE IN CONFLICT THE CONTRACTOR SHALL CO-ORDINATE WITH SDG&E To ADVANCE OFADVARELOCATECONDUITSINL-1/1 V/-1 yp. THE STORY DRAIN CONSTRUCTION
WING & "U" TYPE HEADWALL CITY of VISTA
RUT&UHUN RARMAK DEJAILS
SCALE: 1 -
0- I VEMENT PLANS FOR.• 4
I I
CONSTRUCT CONCRETE LUG PER SDRSD D-63
I .....
33 CONSTRUCT STORY DRAIN CLEANOUT TYPE A-81 PER SDRSD D-9 I
PREPARED IN THE OFFICE OF.
4 I''?REMOVE PORTION OF EXISTING 84" RCP STORM DRAIN 7601721-2000 ll
11 11111111;
111 ....
F
43 REMOVE EXISTING HEADWALL
I
I - '
11 B UCCOLA
lllz___CONSTRUCT STORY DRAIN CLEANOUT TYPE B-6 PER SDRSD D -10 AS -BUILT ENGINEERING, in c 72 CONSTRUCT PROTECTION BARRIER PER DETAIL HEREON
I
SEWER IMP PLANS ADDED & SHEETS RE- NUMBERED i tl Ll I I 311,Z,,, vista Way, Suite 301, Oceanside, CA 92056 41 '
4_::
0p
27732NO. DESCRIPTION CITY I DATE VID, I DATE & " **%00_0r_ 1O• it 111.
APPROVED CHANGES ENGINEER OF WORK RCE DATE
COV REVISION. 911512004 1
F:\223 TWE\01 VistaRedev\dwg\2231-i-sd-12.dwg 2/21/2013 8:53:35 AM PST I
SOUTH SANTA FE REDEVELOPMENT
DRAINAGE PROJECT (CIP-8001
eFS STORM DRAIN LINE N, N-1 & VC- BL/
0 1
q _r -k
jp APPROY6
ND M 55075 6-30-0 S
Uj No. 27732 m - SHEET 12 OF25
Or_ _ l%j for CITY ENGINEER RCE EXPIRCS D
L Exp. 3-31-12
p BENCH MARK: STATION 2063 IN THE CITY OF VISTAx
C IV I\- NETWORK, ESTABLISHED BY RECORD DWG -3979
OF SURVEY NO 14023
0 CN \ LEV 359.22 (NGVD 1929) .
LN 2009-025 VID MAPS F15, G15 & G716
10/27/2026 C3 358 of 424
t i -. g..... -..- ---- ...,_..-
g 1 yi
i _. —
a , -- } _-
F +— i
tl t
t!
t
88 oxo
oo
s
ri __._
1 M_D„l L&C -
1+00 2 +00 3 +00 4+00 5 +00
FORM CHANNEL FOR FUTURE
OUTBOUND CONNECTION
AND FILL W/ SLURRY GROUT
TO FACUILITATE EASY REMOVAL
NEW 10" PVC C900 DR -25
SEWER PIPE W/ BELL END
END CAP 71- 3' srue
LINE DA TA
BEARING DISTANCE
L 1 N29.4428'"W 19380'
L2 N3078'51 "W 186.12'
L3 N6628'02 "E 281.30'
L4 N67'46'30 "E 194.11'
L5 N59'4571 "E 178.63'
L6 S75'4920 "E 23.57'
L7 S59'il'11 "W 56.21'
L8 N29 °44'28 "W 500'
COV REVISION: 911512004
a
1 i
40 SEWER LINE A
IS T. 8" VCP
NEW 10" PVC C900
DR -25 SEWER PIPE
PLUG EXIST OUTGOING 8.-
VCP & PORTION OF
CHANNEL WITH CONCRETE
GPK MANHOLE ADAPTER
SAND COLLAR (TYPICAL)
EXIST 8" MCP
FORM SMOOTH RADIUS
uj CHANNELS IN MANHOLE SHELF
MANHOLE ,f 1 - CHANNEL DETAIL
30 M CML &C D4061-1999
1+00
PROFILE SCALE
1 B' VERT.
1 " = 40' HORIZ.
2 +00
G J
1 - s
ILA
91 85
5' SEWER EASEMENT
TO VISTA /RR DIST
FILE /PAGE NO 138007
RECORDED AUG 6, 1963
CA r
if# =
40,
0 40 80
4 CONSTR UCTION NOTES
82 CONSTRUCT 10" PVC C900 DR -25 SEWER MAIN PER SDRSD SP -01 & VSD S -11 NEW 10 PVC C900 83 CONSTRUCT 48" DIA PRECAST MANHOLE PER SDRSD SR-01, SM -03, M -3 & VSD S -30 DR -25 SEWER PIPE 84 ABANDON EXISTING MANHOLE PER VSD SWR -31 GPK MANHOLE ADAPTER 85 ABANDON EXISTING SEWER PER SDRSD WP -03 SAND COLLAR (TYPICAL 1 86 CONSTRUCT CONCRETE PIPE ENCASEMENT WITH STEEL REINFORCEMENT PER SDRSD SP -09 3 +00
EXIST. 8" VCP- -.)
TO BE ABANDONED
SEiYER LINE B
92 CONSTRUCT 48" DIA PRECAST MANHOLE PER SDRSD SM -01, SM -03 & M -3 OVER
EXISTING SEWER, BREAKOUT PIPE & RE- CHANNEL INVERT PER DETAIL HEREON CONSTRUCT 8" PVC C900 DR -25 SEWER MAIN PER SDRSD SP -01 & VSD S -11 @--:—CONSTRUCT 4" PVC C900 DR -25 SEWER LATERAL PER SDRSD SS -01 (JOIN EXISTING LATERALS NOTE
CONTRACTOR SHALL BE RESPONSIBLE FOR RELOCATION CO- ORDINATION OF 88 CONSTRUCT 3.0' - 10" PVC C900 DR -25 STUB & PLUG PER SDRSD SM -05 ALL DRY UTILITIES REQUIRED. 89 JOIN EXISTING MANHOLE, REMOVE EXIST 8" VCP SEWER AS REQUIRED CONTRACTOR TO PROTECT IN PLACE ALL CITY OF VISTA TRAFFIC SIGNAL CONDUITS, STREET LIGHTS &STREET LIGHT RUNSWEXISTINGMANHOLE (TO BE REMOVED} WHERE SDG &E ELECTRIC CONDUITS ARE IN CONFLICT THE CONTRACTOR f
9) EXISTING 8" VCP SEWER (TO BE REMOVED AS REQUIRED) SHALL CO- ORDINATE WITH SDG &E TO RELOCATE CONDUITS IN ADVANCE OF THE STORM DRAIN CONSTRUCTION.
EXIST. 8 VCP
FORM SMOOTH RADIUS
CHANNELS IN MANHOLE SHELF
MANHOLE j 6 - CHANNEL DETAIL
F: \223 TWE \01 VistaRedev \dwg \2231— i— sd -17— sewer.dwg 6/11/2012 11:58:56 AM PDT o
SCALE 1 " = 40'
40 0 40 80
IMPROVEMENT PLANS FOR:
SOUTH SANTA FE REDEVELOPMENT
DRAINAGE PROJECT (CIP -8001)
SEWER LINE A & B
APPROVED 17 41
5% ( r--= 55075 6-30-1 SHEET 17 0F25for-ICITY ENGINEER RCE EXPIRES A E BENCH MARK: STATION 2063 IN THE CITY OF VISTA
SURVEY CONTROL NETWORK, ESTABLISHED BY RECORD D WG- 39 79 OF SURVEY NO 14023 ELEV 359.22 (NGVD 1929)
LN 2009-025 VI D MAPS F15, G15 & G16
I
10/27/2026 C3 359 of 424
10/27/2026 C3 360 of 424
10/27/2026 C3 361 of 424
10/27/2026 C3 362 of 424
10/27/2026 C3 363 of 424
10/27/2026 C3 364 of 424
10/27/2026 C3 365 of 424
10/27/2026 C3 366 of 424
10/27/2026 C3 367 of 424
VID 20240531
VID GIS Map
Date Printed: 9/30/2025 at 12:29:12 PM
0 0.025 0.05
km
0 0.015 0.03
mi
1:1,128
O
DISCLAIMER: The Vista Irrigation District makes no representation or warranties regarding the accuracy of this map nor the data from which the map was derived. The Vista Irrigation District shall not be liable under any circumstances for any direct, indirect, special, incidental or consequential damages with respect to any claim by any user or any third party on account of or arising from the use of this map. 10/27/2026 C3 368 of 424
VID 20240531
VID GIS Map
Date Printed: 9/30/2025 at 12:28:35 PM
0 0.025 0.05
km
0 0.015 0.03
mi
1:1,128
O
DISCLAIMER: The Vista Irrigation District makes no representation or warranties regarding the accuracy of this map nor the data from which the map was derived. The Vista Irrigation District shall not be liable under any circumstances for any direct, indirect, special, incidental or consequential damages with respect to any claim by any user or any third party on account of or arising from the use of this map. 10/27/2026 C3 369 of 424
á
!PC
]
!£
d),
P
£Ã
P £Ã
P £Ã
!(E
êQ
À565
À837
10"
6"
AC
150
I-2130
-
1 9
8 0
D-14
0 4
-
1 9
7 4
C28
8"CML
&
C
D-23
5 4
-
2 0
2 1
8"PVC
DR14
8"
6"
12"
18"PVC
10"
18"
CML
&
C
D-23
5 4
-
2 0
2 1
AC6"
V17
V22V21
V19
V20
V23
V24
V18
B4
A13
AA3
AA2
2"2
G15 - E43 Reg
G22a - Sycamore & La Mirada
Printed
8/18/2022
VIS
T
A
I
R
R
I
G
A
T
I
O
N
DIS
T
R
I
C
T
N
DIS
C
L
A
I
M
E
R
:
T
h
e
V
i
s
t
a
I
r
r
i
g
a
t
i
o
n
D
i
s
t
r
i
c
t
m
a
k
e
s
n
o
r
e
p
r
e
s
e
n
t
a
t
i
o
n
o
r
wa
r
r
a
n
t
i
e
s
r
e
g
a
r
d
i
n
g
t
h
e
a
c
c
u
r
a
c
y
o
f
t
h
i
s
m
a
p
n
o
r
t
h
e
d
a
t
a
f
r
o
m
w
h
i
c
h
the
m
a
p
w
a
s
d
e
r
i
v
e
d
.
T
h
e
V
i
s
t
a
I
r
r
i
g
a
t
i
o
n
D
i
s
t
r
i
c
t
s
h
a
l
l
n
o
t
b
e
l
i
a
b
l
e
un
d
e
r
a
n
y
c
i
r
c
u
m
s
t
a
n
c
e
s
f
o
r
a
n
y
d
i
r
e
c
t
,
i
n
d
i
r
e
c
t
,
s
p
e
c
i
a
l
,
i
n
c
i
d
e
n
t
a
l
or
c
o
n
s
e
q
u
e
n
t
i
a
l
d
a
m
a
g
e
s
w
i
t
h
r
e
s
p
e
c
t
t
o
a
n
y
c
l
a
i
m
b
y
a
n
y
u
s
e
r
o
r
a
n
y
thi
r
d
p
a
r
t
y
o
n
a
c
c
o
u
n
t
o
f
o
r
a
r
i
s
i
n
g
f
r
o
m
t
h
e
u
s
e
o
f
t
h
i
s
m
a
p
.
ij
DETAIL
6 0
40 20 Fe
e
t
10/27/2026 C3 370 of 424
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
"W
"W "G
ÉG
ÉG
"W
"W
"W
"W
"W
"W
D103241
D3748669967
D3749469973
D247
8 0
7 D123851
D123849
D3744670075
D3743970035
D3747670013
D3743670029
D3747870021
D3746870039
D3745270014
D3749470021
D3475169967
D3750669982
D3745070020
D3745970019
D3752469932
D3752869975
D3744970008
D3748670008
D247
8 0
8D3476469949
D3744970003
D3746870018
D3744270065
D3749869958
D3745769975
D3747670044
D123850
D154592
SH512185
H101990
H3748669967
SH511846
H111966
SH512178
SH507522
SH511816
SH511871
SH512138
H3746770043
H3475469969
SH512140
SH512145
H101991
H3746870018
H3744270065
J
J
J
J
\\\\
\
\\
\
\
\
\
\\\
\\
\
\
DD
D
D
\
\
"p%
"p%
"p%
"p%
!q%
!q%
!q%
"p%
q
"p%
!q%
"p%
"p%
"p%
!q%
"p%
!q%
q
"p%
"p%
"p%
!q%
"p%
q
n
Îj
Îk
Îk
Îk
Îƙ
Îk
Îl
Țș
Țș
JGd
JGd
JGd
JGd
8 8
:
<
8 <
D
8 8
8<
<
D
D
8 8
<
`
8 D
8 D
8 <
D
5 5
5 Ȍ1
5 5
5 Ȍ1
À75
5 5
5\
5 Ȍ1
5 5 5
5 5
5 Ȍ1
5 5
5 5
5 5
5 Ȍ1
5 3
5 5
5 5\5
5 5
5 Ȍ1
5 55
5 55
Ȍ1
Ȍ1
5 55
Ȍ1
Ȍ1
5 5 5
5 5
5 Ȍ1
5 5
Î6
5 5
Ȍ1
Ȍ1
5\
5 5
5\
5 55
5 5
5 5
À7
5 5\
5 5
5 5
À7
55 5
5 5
5 Ȍ1
5 Ȍ1
5 Ȍ1
5\
5 5
55 5
5 Ȍ1
5 55 3
5 5 5
5 5
5 5
5 5
206-93 1 - 150 HZR
206-66 1 - 75 HZR
206-99 1 - 150 HZS
206-465 1 - 150 HZS
206-279 1 - 75 N TS
206-2
0 1
6 1 - 75
0 H
N
S
206-119 1 - 225 HZR
206-272 1 - 25 HE
206-95 1 - 75 HZS
206-63 1 - 150 HBS
206-69 1 - 25 HE
206-539 1 - 50 N TS
206-94 1 - 75 HBS
206-425 1 - 75 HZR
206-432 1 - 25 N DS
206-357 1 - 25 N DS
206-96 1 - 300 HN S
206-305 1 - 50 HTS 206-120 1 - 150 HBS
206-540 1 - 50 N DD
206-271 1 - 150 HZP
206-151 1 - 150 HBS
206-176 1 - 300 HN S
206-62 1 - 75 HZR
206-356 1 - 50 HTS
206-546 1 - 25 HE
206 #2 AL ZØCN
3 5
7 '
206 2/0 AL 3ØCN
2 2
8 '
206 1000 AL 3ØCN 587'
206 #2 AL 3ØCN
9 6
'
206 #2 AL 1ØCN
1 1
6 '
206 #2 AL 3ØCN
3 0
0 '
206 1000 AL 3ØCN 545'
206 #2 AL 3ØCN 300'
206 #2 AL
2 Ø
C
N
1 6
0 '
206 #2 AL ZCN
1 0
0 '
206 2/0 AL 3ØCN
3 1
4 '
206 2/0 AL 3ØCN
1 4
0 '
206 2/0 AL 3ØCN
1 8
2 '
206 2/0 AL 3ØCN 376'
206 2/0 AL 3ØCN
2 3
0 '
206 2/0 A
L
3 Ø
C
N
2 3
0 '
206 #2 SOL AL 3ØC
N
1 3
8 '
206 #2 AL 3ØCN 310'
206 2/0 AL 3ØCN
1 6
2 '
206 2/0 AL 3ØCN 78'
206 2/0 AL 3ØCN 480'
206 2/0 AL 3ØCN 285'
206 #2 AL ZØCN 227'
206 2/0 AL 3ØCN 255'
206 2/0 AL 3ØCN
1 3
6 '
206
2 /
0 A
L
3 Ø
C
N
1 8
2 '
206 2/0 AL 3ØCN 310'
206 1000 AL 3ØCN 565'
206 #2 AL YØCN
2 0
4 '
206 2/0 AL 3ØCN 254'
206 2/0 AL 3ØCN 400'
206
#
2 A
L
3 Ø
C
N
2 4
2 '
206 2/0 AL 3ØCN
1 2
0 '
206 #2 AL YZCN 275'
206 #2 AL ZØCN 254'
206 #2 AL YZCN
2 5
0 '
206 #2 AL 3ØCN
2 5
0 '
206 #2 AL 2ØCN 160'
206 2/0 AL 3ØCN 600'
206 #2 AL ZCN 100'
206 #6 CU 2ØN
206 #6 CU 2ØN
206 4/0 CU 3ØN
206 #6 CU 2Ø
206 3 - 150A
206 3 - 65A
206 3
-
1 5
0 A
206 1 - BR GD
206 3 - 150A
206 2 - 20A
993
938
1014
1042
1201
963
985
1225
1010
1036
1056
1068
1118
955
912
952
945
959
960
995
1210
931 980
998
1011
1230
1206
1043
942
961
934
1226
1233
1221
1031
1209
905
967
969
977
1234
1237
1229
1214
1028
1202
1205
1070
904
930
955
940
962
1020
1217
1040
1110
941
950
970
936
1004
1025
1222
1218
1213
1035
1050
1045
S SantaFe AvePostal Way
Postal Way
R anc h
o
P
a
c
i
f
i
c
a
P
l
Alta Calle
Santa Fe Pl
Santa Anita Pl
S SantaFe Ave
S SantaFe Ave
S SantaFe Ave
2-#6 B.STR D CU1-#6 B.STR D CU N
2-3/0 SEC AL AL1-3/0 SEC AL AL N
1-#4 B.STR D CU
N
2-#4 B.STR D CU
1-#4 B.STR D CU
N
2-3/0 USA AL
2-#2 USA AL
2-#8SIDAAL
2-3/0USAAL
2-3/0 USA AL
2-3/0USA AL
2-3/0 USA AL
2-3/0 USA AL
2-3/0 USA AL
2-3/0 USA AL
2-3/0USAAL
2-3/0 U SA AL
1-#8 USA AL
2-350 USA AL
2-3/0 USA AL
2-#8 SIDA AL
2-#8 SIDA AL
Printe d
D
a
t
e
:
Printe d
B
y
:
Map ID:Map N
u
m
b
e
r
:
Elec
t
r
i
c
A
s
s
e
t
M
a
p
15690-120500
15690-120480
15675-120490 15705-120490
15690-120490
Boyle
,
E
v
a
n
J 9/23/2025
I
0 10050
Fe e t
CON
F
I
D
E
N
T
I
A
L
-
P
R
O
P
E
R
T
Y
O
F
S
D
G
&
E
.
F
O
R
I
N
T
E
R
N
A
L
U
S
E
O
N
L
Y
,
U
N
A
U
T
H
O
R
I
Z
E
D
DISSEM
I
N
A
T
I
O
N
P
R
O
H
I
B
I
T
E
D
.
T
H
I
S
D
O
C
U
M
E
N
T
S
H
A
L
L
B
E
T
R
E
A
T
E
D
A
S
C
O
N
F
I
D
E
N
T
I
A
L
PUR
S
U
A
N
T
T
O
P
u
b
l
i
c
U
t
i
l
i
t
i
e
s
C
o
d
e
S
e
c
t
i
o
n
5 8
3 ,
G
e
n
e
r
a
l
O
r
d
e
r
6 6
-
C
,
a
n
y
a
p
p
l
i
c
a
b
l
e
n
o
n
-
d
i
s
c
l
o
s
u
r
e
agre e
m
e
n
t
,
a
n
d
/
o
r
t
h
e
N
o
r
t
h
A
m
e
r
i
c
a
n
E
l
e
c
t
r
i
c
R
e
l
i
a
b
i
l
i
t
y
C
o
r
p
o
r
a
t
i
o
n
'
s
R
u
l
e
s
o
f
P
r
o
c
e
d
u
r
e
,
S
e
c
t
i
o
n
1 5
0 0
e t se q
.
a
n
d
a
n
y
o
t
h
e
r
a
p
p
l
i
c
a
b
l
e
f
e
d
e
r
a
l
a
n
d
s
t
a
t
e
l
a
w
s
a
n
d
r
e
g
u
l
a
t
i
o
n
s
.
T
H
I
S
M
A
P
I
S
N
O
T
S
U
R
V
E
Y
GR A
D
E
,
a
n
d
S
D
G
&
E
m
a
k
e
s
n
o
r
e
p
r
e
s
e
n
t
a
t
i
o
n
s
o
r
w
a
r
r
a
n
t
i
e
s
,
e
x
p
r
e
s
s
e
d
o
r
i
m
p
l
i
e
d
,
a
s
t
o
i
t
s
a
c
c
u
r
a
c
y
,
c orre c
t
n
e
s
s
,
d
e
f
e
n
s
i
b
i
l
i
t
y
,
c
o
m
p
l
e
t
e
n
e
s
s
o
r
a
n
y
o
t
h
e
r
s
t
a
n
d
a
r
d
o
r
m
e
a
s
u
r
e
o
f
q
u
a
l
i
t
y
o
r
a
d
e
q
u
a
c
y
,
o
r
a
s
t
o
its fi
t
n
e
s
s
f
o
r
u
s
e
o
r
i
n
t
e
n
d
e
d
u
s
e
f
o
r
a
n
y
p
a
r
t
i
c
u
l
a
r
p
u
r
p
o
s
e
.
S
D
G
&
E
d
i
s
c
l
a
i
m
s
a
l
l
l
i
a
b
i
l
i
t
y
f
o
r
y
o
u
r
s
e
l
e
c
t
i
o
n
or use of this m ap
o
r
a
n
y
c
o
n
s
e
q
u
e
n
c
e
s
t
h
e
r
e
f
r
o
m
.
“
C
e
r
t
a
i
n
t
e
c
h
n
o
l
o
g
y
u
s
e
d
u
n
d
e
r
l
i
c
e
n
s
e
f
r
o
m
A
T
&
T
Inte lle
c
t
u
a
l
P
r
o
p
e
r
t
y
I
,
L
.
P
.
C
o
p
y
r
i
g
h
t
©
1 9
9 8
–
2 0
0 7
A
T
&
T
I
n
t
e
l
l
e
c
t
u
a
l
P
r
o
p
e
r
t
y
1 ,
L
.
P
.
A
l
l
R
i
g
h
t
s
R
e
s
e
r
v
e
d
.
10/27/2026 C3 371 of 424
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
%
%
%
%
%
%\
%
%
%
%
%
%
%
%
%
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
"W
"W
"W\
åT
D196863
D100517
D135748
D108858
D3724270334
D245
9 7
8 D108756
D106563
D3739270080
D3737570102
D127605
D3741270071
D245
9 6
9 D212697
D113115
SH507556
SH508203
H3724170333
SH507884
H3741270071
SH507891
H3738770128
H3732770175
H3732770187
M3737570102
SH507881
SH507914
SH507907
SH508567
SH507931
SH508571
J
J
J
J
J
\
\\\
\\\\
\
\
\
\
\\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\\\
\\
\\
\
\
\
\
\
\
\
\
\
\
\
\
\
D
D
\
\\\\\
\\\\\
!q%
q
q
q
"p%
!q%
!q%
"p%
q
!q%
"p%
!q%
"p%
"p%
qz
n
ȏ
n n
Îm
Îl
Îƙ
ȚșX
ȚșXȚșX
Anj __`ZȀ ZȀZȀZȀ
JGd
JGd
JGd
JGd
<
<
D
Î?
<
D
Î?
8 8
Î?
<
8 8
D
D
<
8 `
<
D
<
<<<
<
<
8 D
5 5
5 À7À7
5 7
5 5
5 5 Ȍ1Ɣ
5 7
À7
5 555
5\
5 À7
5 5\
5 7
5 5
5 5
5 5
5 5
5 5
5 5
7 5
5 5
5 Ȍ1Ɣ
5 5
5 5
5\
Ȍ1
Ȍ1
5 5
Ȍ1Ɣ
Ȍ1Ɣ
5 Î6
206-237 1 - 50 HE
859-11611 - 150 HZB
859-11621 - 75 HBS
206-2
0 1
2 1 - 15
0 H
N
S
206-410 1 - 25 N TS
206-414 1 - 25 HE
206-692 1 - 50 HTS
ALV 1-57
1 - 25 W
PH1-1251 - 25 SID
ALV 1-65
1 - 25 SDS
206-11001 - 25 H
505-968 1 - 10 HE
206-390 2 - 25 HDS
206-58 1 - 300 HBS
859-11591 - 50 HDL
859-11571 - 75 HBS
206-959
206 #2 AL 3Ø CN
4 3
0 '
206 1000 AL 3Ø CN 102'
206 #2 AL 3Ø CN
2 8
0 '
206 #2 AL 1Ø CN
1 9
2 '
206 #2 AL 3Ø CN
6 0
0 '
206 1000 AL 3Ø CN
5 6
3 '
206 1000 AL 3Ø CN
6 0
0 '
206 1000 AL 3Ø CN
5 9
8 '
206 2/0 AL 3ØCN 61
6 '
859 1000 AL 3Ø CN
5 2
6 '
859 #2 AL 3Ø CN
2 4
6 '
859 2/0 AL 3Ø CN 130'
859 2/0 AL 3Ø CN
1 3
6 '
206
#
2 A
L
1 Ø
C
N
2 0
0 '
ALV 1
#
2 A
L
1 Ø
C
N
1 1
4 '
859 1000 AL 3Ø CN
5 9
8 '
206 2
/
0 A
L
3 Ø
C
N
5 8
0 '
206 2/0 AL 3Ø CN 640'206 2/0 AL 3Ø CN
6 1
6 '
859 2/0 AL 3Ø CN 130'
206 #2 AL XYØ CN 210'
ALV 1 #6 CU 1Ø N
ALV 1 #6 CU 1Ø N
206 #2 AL 2Ø
206 #2 AL 2Ø
206 #2 AL 2Ø
206 636 AL 3Ø N
ALV 1 #6 CU 1Ø N
206 636 AL 3Ø N
206 #4 CU 2Ø
505 #6 CU 2Ø N
ALV 1
#
4 C
U
1 Ø
N
505 #6 CU 2Ø N
206 636 AL 3Ø N
206 636 AL 3Ø N
206 3 - 30A
206 2 - 15A
ALV 1 1 - 20A
WAY 1 206-960
WAY 2 206-961F
WAY 3 206-T12-859
WAY 4 206-963F
1085
1085
1082
1081
1207
1209
1264
1083
1118
1055
1085
1149
1201
1086
1252
1121
1086
1085
1006
1119
1125
1168
1051
1082
1124
1140
1018
2248
1114
1118
1076
1122
1069
989
1070
1115
1135
1131
1112
1024
1075
1203
1205
1233
1258
1188
1139
1144
1065 1066
1056
1094
1147
1112
1025
1120
Lind y
L
n
N osta lgia
P
l
Monte V ista Dr
MonteV ista Dr
Monte V ista Dr
S Sa ntaFe Ave
S Sa ntaFe Ave
2-1/0 SSC AL AL1-1/0 SSC AL AL N
2-#2 SSC AL AL 1-#2 SSC AL AL N
2-#2 SSC AL AL
1-#2 SSC AL AL N
2-#2 SSC AL AL 1-#2 SSC AL AL N
2-1/0 SSC AL AL1-1/0 SSC AL AL N 2-1/0 SSC AL AL1-1/0 SSC AL AL N 2-3/0 SEC AL AL1-3/0 SEC AL AL N
2-#4 B.STR D CU1-#6 B.STR D CU N
2-#2 SSC AL AL1-#2 SSC AL AL N
2-3/0 USA AL
2-3/0 USA AL
2-3/0 USA AL
2-#2 USA AL
1-#8 SIDA AL
2-3/0 USA AL
2-3/0 USA AL
2-3/0 U SA AL
2-1/0 USA AL
2-350USAAL
2-350USAAL
2-3/0 USA AL
2-3/0 USA AL
2-3/0 USA AL
2-3/0 USA AL
Printed Da
t
e
:
Printed By
:
Ma p
I
D
:
Ma p
N
u
m
b
e
r
:
Elec
t
r
i
c
A
s
s
e
t
M
a
p
15705-120490
15705-120470
15690-120480 15720-120480
15705-120480
Boyle
,
E
v
a
n
J 9/23/2025
I
0 10050
Feet
CON
F
I
D
E
N
T
I
A
L
-
P
R
O
P
E
R
T
Y
O
F
S
D
G
&
E
.
F
O
R
I
N
T
E
R
N
A
L
U
S
E
O
N
L
Y
,
U
N
A
U
T
H
O
R
I
Z
E
D
DISSEM
I
N
A
T
I
O
N
P
R
O
H
I
B
I
T
E
D
.
T
H
I
S
D
O
C
U
M
E
N
T
S
H
A
L
L
B
E
T
R
E
A
T
E
D
A
S
C
O
N
F
I
D
E
N
T
I
A
L
PUR
S
U
A
N
T
T
O
P
u
b
l
i
c
U
t
i
l
i
t
i
e
s
C
o
d
e
S
e
c
t
i
o
n
5 8
3 ,
G
e
n
e
r
a
l
O
r
d
e
r
6 6
-
C
,
a
n
y
a
p
p
l
i
c
a
b
l
e
n
o
n
-
d
i
s
c
l
o
s
u
r
e
a gre
e
m
e
n
t
,
a
n
d
/
o
r
t
h
e
N
o
r
t
h
A
m
e
r
i
c
a
n
E
l
e
c
t
r
i
c
R
e
l
i
a
b
i
l
i
t
y
C
o
r
p
o
r
a
t
i
o
n
'
s
R
u
l
e
s
o
f
P
r
o
c
e
d
u
r
e
,
S
e
c
t
i
o
n
1 5
0 0
et seq. a nd
a
n
y
o
t
h
e
r
a
p
p
l
i
c
a
b
l
e
f
e
d
e
r
a
l
a
n
d
s
t
a
t
e
l
a
w
s
a
n
d
r
e
g
u
l
a
t
i
o
n
s
.
T
H
I
S
M
A
P
I
S
N
O
T
S
U
R
V
E
Y
GR A
D
E
,
a
n
d
S
D
G
&
E
m
a
k
e
s
n
o
r
e
p
r
e
s
e
n
t
a
t
i
o
n
s
o
r
w
a
r
r
a
n
t
i
e
s
,
e
x
p
r
e
s
s
e
d
o
r
i
m
p
l
i
e
d
,
a
s
t
o
i
t
s
a
c
c
u
r
a
c
y
,
c orrec
t
n
e
s
s
,
d
e
f
e
n
s
i
b
i
l
i
t
y
,
c
o
m
p
l
e
t
e
n
e
s
s
o
r
a
n
y
o
t
h
e
r
s
t
a
n
d
a
r
d
o
r
m
e
a
s
u
r
e
o
f
q
u
a
l
i
t
y
o
r
a
d
e
q
u
a
c
y
,
o
r
a
s
t
o
its fi
t
n
e
s
s
f
o
r
u
s
e
o
r
i
n
t
e
n
d
e
d
u
s
e
f
o
r
a
n
y
p
a
r
t
i
c
u
l
a
r
p
u
r
p
o
s
e
.
S
D
G
&
E
d
i
s
c
l
a
i
m
s
a
l
l
l
i
a
b
i
l
i
t
y
f
o
r
y
o
u
r
s
e
l
e
c
t
i
o
n
or use of this m a
p
o
r
a
n
y
c
o
n
s
e
q
u
e
n
c
e
s
t
h
e
r
e
f
r
o
m
.
“
C
e
r
t
a
i
n
t
e
c
h
n
o
l
o
g
y
u
s
e
d
u
n
d
e
r
l
i
c
e
n
s
e
f
r
o
m
A
T
&
T
Intellec
t
u
a
l
P
r
o
p
e
r
t
y
I
,
L
.
P
.
C
o
p
y
r
i
g
h
t
©
1 9
9 8
–
2 0
0 7
A
T
&
T
I
n
t
e
l
l
e
c
t
u
a
l
P
r
o
p
e
r
t
y
1 ,
L
.
P
.
A
l
l
R
i
g
h
t
s
R
e
s
e
r
v
e
d
.
10/27/2026 C3 372 of 424
>
>
1'
79'
190'
18'
135'
225'
61 '
620'
61'
22'
36 '
72'
69'
24'
5'
5'
7'
10'
4'102
'
18'
15'
14'
688'
7'
10'
52'
6'
34'6'
10'
18'
1'
31'
59'
52'
30'
20'
6'
169'
6'
33'
1'
844'
6'
472'16
'
4'
18'
6'
44'
7'
42'
2'
4'
2'
272'
2'
180'
10'
716'
442'
49'
8'
100
'
91'
3'
12'
3'
POSTALWAY
ALT
A
C
A
L
L
E
SANT
A
F
E
A
V
E
1004
102
5 995
1028
103
6 105
0 101
1 L 7
101
4 993
L 10
101
0 10
4 5
L 51
1031
1035
105
6 98
5 998
104
2 1040
10 6
8 10
7 0
104
3 102
0 L 8
VISTA
US POSTAL
SERVICE
15697-120495
15697-120485
15 6
9 0
-
1 2
0 4
9 0
15 7
0 5
-
1 2
0 4
9 0
9/2
4 /
2 0
2 5
Pri
n
t
e
d
B
y
:
Pri
n
t
e
d
D
a
t
e
:
Ma
p
N
u
m
b
e
r
:
hje
o
n
g
Ma
p
T
y
p
e
:
Gas
A
s
s
e
t
M
a
p
15 6
9 7
-
1 2
0 4
9 0
I
40 Feet
SD
G
&
E
i
s
p
r
o
v
i
d
i
n
g
t
h
i
s
m
a
p
t
o
y
o
u
a
s
a
c
o
u
r
t
e
s
y
.
S
D
G
&
E
d
o
e
s
n
o
t
r
e
p
r
e
s
e
n
t
t
h
a
t
t
h
e
i
n
f
o
r
m
a
t
i
o
n
con
t
a
i
n
e
d
h
e
r
e
i
n
i
s
a
c
c
u
r
a
t
e
.
S
D
G
&
E
d
i
s
c
l
a
i
m
s
a
l
l
w
a
r
r
a
n
t
i
e
s
,
e
x
p
r
e
s
s
o
r
i
m
p
l
i
e
d
,
i
n
c
l
u
d
i
n
g
t
h
e
w
a
r
r
a
n
t
y
of
f
i
t
n
e
s
s
f
o
r
p
a
r
t
i
c
u
l
a
r
p
u
r
p
o
s
e
.
Y
o
u
a
r
e
s
o
l
e
l
y
r
e
s
p
o
n
s
i
b
l
e
f
o
r
s
e
l
e
c
t
i
n
g
t
h
i
s
m
a
p
t
o
u
s
e
a
n
d
y
o
u
a
r
e
s
o
l
e
l
y
res
p
o
n
s
i
b
l
e
f
o
r
a
n
y
c
o
n
s
e
q
u
e
n
c
e
s
r
e
s
u
l
t
i
n
g
f
r
o
m
y
o
u
r
u
s
e
.
10/27/2026 C3 373 of 424
2'
36'
10'
7'
6'
9'
382
'
2'
6'
440'
12'
22'
9'
160'
2'
48'
25 '
65'
10 '
36'
30'
275'
10'
300'
70'
3'
2'
21'
10'
28'
5'
88'
317
'
30'
340
'
79'
31'
51'
54'
1'
2'
254
'
168
'
SAN
T
A
F
E
A
V
E
POSTAL WAY
995
L 36
105
1 1085
L 10
991
993
103
1 98
7 108
5 10
6 9
VISTA
US POSTAL
SERVICE
15697-120490
15697-120480
15 6
9 0
-
1 2
0 4
8 5
15 7
0 5
-
1 2
0 4
8 5
9/2
4 /
2 0
2 5
Pri
n
t
e
d
B
y
:
Pri
n
t
e
d
D
a
t
e
:
Ma
p
N
u
m
b
e
r
:
hje
o
n
g
Ma
p
T
y
p
e
:
Gas
A
s
s
e
t
M
a
p
15 6
9 7
-
1 2
0 4
8 5
I
40 Feet
SD
G
&
E
i
s
p
r
o
v
i
d
i
n
g
t
h
i
s
m
a
p
t
o
y
o
u
a
s
a
c
o
u
r
t
e
s
y
.
S
D
G
&
E
d
o
e
s
n
o
t
r
e
p
r
e
s
e
n
t
t
h
a
t
t
h
e
i
n
f
o
r
m
a
t
i
o
n
con
t
a
i
n
e
d
h
e
r
e
i
n
i
s
a
c
c
u
r
a
t
e
.
S
D
G
&
E
d
i
s
c
l
a
i
m
s
a
l
l
w
a
r
r
a
n
t
i
e
s
,
e
x
p
r
e
s
s
o
r
i
m
p
l
i
e
d
,
i
n
c
l
u
d
i
n
g
t
h
e
w
a
r
r
a
n
t
y
of
f
i
t
n
e
s
s
f
o
r
p
a
r
t
i
c
u
l
a
r
p
u
r
p
o
s
e
.
Y
o
u
a
r
e
s
o
l
e
l
y
r
e
s
p
o
n
s
i
b
l
e
f
o
r
s
e
l
e
c
t
i
n
g
t
h
i
s
m
a
p
t
o
u
s
e
a
n
d
y
o
u
a
r
e
s
o
l
e
l
y
res
p
o
n
s
i
b
l
e
f
o
r
a
n
y
c
o
n
s
e
q
u
e
n
c
e
s
r
e
s
u
l
t
i
n
g
f
r
o
m
y
o
u
r
u
s
e
.
10/27/2026 C3 374 of 424
Ù
>
>
>
>
>
>
170
'
193
'
489
'
5'
16'
30'
120
'
6'
25'
508'
25'
459
'
41'
427
'
10'
8'
30'
35'
14 '
4'
19'
49'1'
60 '
210
'
143'
1'
5'
76'
16'
69'
1'
12'
4'R
22'
2'
491
'
5'
12'
51'4'
65'
107
'
63'
491'
3'
96'
36'
2'
SAN
T
A
F
E
A
V
E
NOSTALGIA PL
MONTE VISTA DR
10 5
1 1085
1085
108
2 108
2 1094
L 63
1086
L 5
3 1085
1070
L 5
3 106
9 L 3
4 L 34
1081
10 8
3 VISTA
Cen
t
e
r
l
i
n
e
15705-120490
15705-120480
15 6
9 7
-
1 2
0 4
8 5
15 7
1 2
-
1 2
0 4
8 5
9/2
4 /
2 0
2 5
Pri
n
t
e
d
B
y
:
Pri
n
t
e
d
D
a
t
e
:
Ma
p
N
u
m
b
e
r
:
hje
o
n
g
Ma
p
T
y
p
e
:
Gas
A
s
s
e
t
M
a
p
15 7
0 5
-
1 2
0 4
8 5
I
40 Feet
SD
G
&
E
i
s
p
r
o
v
i
d
i
n
g
t
h
i
s
m
a
p
t
o
y
o
u
a
s
a
c
o
u
r
t
e
s
y
.
S
D
G
&
E
d
o
e
s
n
o
t
r
e
p
r
e
s
e
n
t
t
h
a
t
t
h
e
i
n
f
o
r
m
a
t
i
o
n
con
t
a
i
n
e
d
h
e
r
e
i
n
i
s
a
c
c
u
r
a
t
e
.
S
D
G
&
E
d
i
s
c
l
a
i
m
s
a
l
l
w
a
r
r
a
n
t
i
e
s
,
e
x
p
r
e
s
s
o
r
i
m
p
l
i
e
d
,
i
n
c
l
u
d
i
n
g
t
h
e
w
a
r
r
a
n
t
y
of
f
i
t
n
e
s
s
f
o
r
p
a
r
t
i
c
u
l
a
r
p
u
r
p
o
s
e
.
Y
o
u
a
r
e
s
o
l
e
l
y
r
e
s
p
o
n
s
i
b
l
e
f
o
r
s
e
l
e
c
t
i
n
g
t
h
i
s
m
a
p
t
o
u
s
e
a
n
d
y
o
u
a
r
e
s
o
l
e
l
y
res
p
o
n
s
i
b
l
e
f
o
r
a
n
y
c
o
n
s
e
q
u
e
n
c
e
s
r
e
s
u
l
t
i
n
g
f
r
o
m
y
o
u
r
u
s
e
.
10/27/2026 C3 375 of 424
Ù
>
>
62'
23'
4'
10'
24'
16'
558
'
2'R
3'
10'
102'
44'
171
'
2'
275
'
11'
4'
12'
40'
2'
28'
285'
2'
13'
18'
4'
5'22'
28'
5'
39'
9'
8'
2'R
6'
3'
121
'
19'
5'
488'
3'R
21'
5'R
1'
8'
38'
35'
38'
32'
2'
5'R
2'
5 7'
276
'
2'
5'R
2'
5'
20'
4'R
12'
1'
38'
5'
32'
1'
16'
5'
1'
5'
120
6 '
5'
3'
18 '
MONTE VISTA DR
SANTAFEAVE
989
1085
L 34
1121
L 34
1147
L 6
3 1264
1135
1139
114
0 125
8 1085
1118
1124
1131
116
8 L 34
1112
114
4 1188
L 3
4 1115
VISTA
15705-120485
15705-120475
15 6
9 7
-
1 2
0 4
8 0
15 7
1 2
-
1 2
0 4
8 0
9/2
4 /
2 0
2 5
Pri
n
t
e
d
B
y
:
Pri
n
t
e
d
D
a
t
e
:
Ma
p
N
u
m
b
e
r
:
hje
o
n
g
Ma
p
T
y
p
e
:
Gas
A
s
s
e
t
M
a
p
15 7
0 5
-
1 2
0 4
8 0
I
40 Feet
SD
G
&
E
i
s
p
r
o
v
i
d
i
n
g
t
h
i
s
m
a
p
t
o
y
o
u
a
s
a
c
o
u
r
t
e
s
y
.
S
D
G
&
E
d
o
e
s
n
o
t
r
e
p
r
e
s
e
n
t
t
h
a
t
t
h
e
i
n
f
o
r
m
a
t
i
o
n
con
t
a
i
n
e
d
h
e
r
e
i
n
i
s
a
c
c
u
r
a
t
e
.
S
D
G
&
E
d
i
s
c
l
a
i
m
s
a
l
l
w
a
r
r
a
n
t
i
e
s
,
e
x
p
r
e
s
s
o
r
i
m
p
l
i
e
d
,
i
n
c
l
u
d
i
n
g
t
h
e
w
a
r
r
a
n
t
y
of
f
i
t
n
e
s
s
f
o
r
p
a
r
t
i
c
u
l
a
r
p
u
r
p
o
s
e
.
Y
o
u
a
r
e
s
o
l
e
l
y
r
e
s
p
o
n
s
i
b
l
e
f
o
r
s
e
l
e
c
t
i
n
g
t
h
i
s
m
a
p
t
o
u
s
e
a
n
d
y
o
u
a
r
e
s
o
l
e
l
y
res
p
o
n
s
i
b
l
e
f
o
r
a
n
y
c
o
n
s
e
q
u
e
n
c
e
s
r
e
s
u
l
t
i
n
g
f
r
o
m
y
o
u
r
u
s
e
.
10/27/2026 C3 376 of 424
206
Appendix J:
City of Vista Business License Application
City of Vista Business License Application can be accessed here:
https://blrenewals.vista.gov/Apply/GettingStarted/BusinessLicense
10/27/2026 C3 377 of 424
207
Appendix K:
EDCO Trash Schedule, VUSD Schedule, NCTD
Route Map
10/27/2026 C3 378 of 424
10/27/2026 C3 379 of 424
10/27/2026 C3 380 of 424
Key: Bold – Non-Student Day VISTA UNIFIED SCHOOL DISTRICT Board Approved: 5/6/2021 *- Minimum Day 2023-2024 School Calendar Board Approved Revision: 5/5/2022 School
Month M T W T F Student
Days
Teacher
Days Key Dates/Explanations
July 3 4 5 6 7
10 11 12 13 14 July 4 - Independence Day (Legal Holiday) 17 18 19 20 21
24 25 26 27 28
31 August 1 2 3 4
12 16
Aug. 10 - District Professional Development Day (Non-Student Day) 7 8 9 10 11 Aug. 11 - District Professional Development Day (Non-Student Day) 14 15 16 17 18 Aug. 14 - Teacher Preparation Day (Non-Student Day) 21 22 23 24 25 Aug. 15 - Site Professional Development Day (Non-Student Day) 28 29 30 31 Aug. 16 - First Day of School
September 1
20 20
4 5 6 7 8 Sept. 4 - Labor Day (Legal Holiday)
11 12 13* 14 15 Sept. 13 - K-8 Staff Development Day (Minimum Day) 18 19 20 21 22
25 26 27 28 29
October 2 3 4 5 6
22 22
9 10 11 12 13 Oct. 19&20 - MVHS Finals (Minimum Days)
16 17 18 19* 20*
23 24 25 26 27
30 31
November 1 2 3
16 16
Nov. 10 - Veteran’s Day (Observed Legal Holiday)
6 7 8 9 10 Nov. 14-17 - K-5 Parent Teacher Conf. (Minimum Days) 13 14* 15* 16* 17* Nov. 15&16 - 6-8 Parent Teacher Conf. (Minimum Day) 20 21 22 23 24 Nov. 20-24 - K-12 Non-Student Days
27 28 29 30 Nov. 23 - Thanksgiving Holiday (Legal Holiday) December 1
14 14
Dec. 18-20 - RBVHS & VHS Finals (Minimum Days)
4 5 6 7 8 Dec. 19&20 - MVHS Finals (Minimum Days)
11 12 13 14 15 Dec. 21-31 - Winter Recess (School Resumes Jan.10) 18* 19* 20* 21 22 Dec. 25 - Christmas Day Observed (Legal Holiday) 25 26 27 28 29
January 1 2 3 4 5
15 17
Jan. 1 - New Year’s Day Observed (Legal Holiday)
8 9 10 11 12 Jan. 1 - Winter Recess (School Resumes Jan.10) 15 16 17 18 19 Jan. 8 - HS Professional Development Day (Non-Student Day) 22 23 24 25 26 Jan. 8 - K-8 Non-Student Day/Non-Staff Day 29 30 31 Jan. 9 - District Professional Development Day (Non-Student Day) Jan. 15 - M.L. King Birthday (Legal Holiday)
February 1 2
18 18
5 6 7 8 9 Feb. 16 - Observed Lincoln’s Birthday (Legal Holiday) 12 13 14 15 16 Feb. 19 - President’s Day (Legal Holiday) 19 20 21 22 23 Feb. 20 - Non-Student Day/Non-Staff Day
26 27 28* 29 Feb. 28 - K-8 Staff Development Day (Minimum Day) March 1
21 21
4 5 6 7 8 Mar. 13&14 - 6-8 Parent/Teacher Conf. (Minimum Day) 11 12 13* 14* 15* Mar. 14&15 - MVHS Finals (Minimum Day) 18 19 20 21 22
25 26 27 28 29
April 1 2 3 4 5
17 17
8 9 10 11 12 Apr. 1-5 - Spring Break
15 16 17 18 19
22 23 24 25 26
29 30
May 1 2 3
22 22
6 7 8 9 10 May 27 - Memorial Day (Legal Holiday)
13 14 15 16 17
20 21 22 23 24
27 28 29 30 31
June 3* 4* 5* 6 7
3 3
Jun. 3-5 RBV/VHS Finals (Minimum Days)
10 11 12 13 14 Jun. 4&5 - MVHS Finals (Minimum Days)
17 18 19 20 21 June 5 - Last Day of School (Minimum Day - All) 24 25 26 27 28 Jun. 19 - Juneteenth Observed (Legal Holiday) 180 STUDENT DAYS
10/27/2026 C3 381 of 424
10/27/2026 C3 382 of 424
10/27/2026 C3 383 of 424
10/27/2026 C3 384 of 424
208
Appendix L:
City of Vista Sewage Bypass and Pumping
Guidelines
The complete City of Vista Sewage Bypass and Pumping Guidelines can be downloaded here:
https://www.vista.gov/home/showpublisheddocument/27000/638103 299314700000
10/27/2026 C3 385 of 424
CITY of VISTA
WORK TO BE DONE
DECLARATION OF RESPONSIBLE CHARGE
KEY MAP LEGEND
REFERENCE DRAWINGS
SHEET INDEX
GENERAL NOTES SEWER IMPROVEMENT PLANS FOR:
S. SANTA FE SEWER IMPROVEMENTS
TOPOGRAPHY SOURCE
LEGAL DESCRIPTION
LEGEND
PROPERTY ADDRESS
OWNER/APPLICANT
APN
SPECIAL NOTES
EXISTING
PROPOSED
PROJECT
SITE
N
4 5
EX. MANHOLE
STA: 9+95.00
EX. MANHOLE
STA: 18+86.25
4 N
STATIONING NOTE
60370 7/21/26
3-8-2678297
55075 8-5-26
10/27/2026 C3 386 of 424
CITY of VISTA
“”
“”
“”
”
””
SEWER NOTES
LEGEND OF ABBREVIATIONS:
CONSTRUCTION NOTES
’
’
’
’
’
’
’
’
“”
VISTA IRRIGATION DISTRICT (DISTRICT) NOTES
A EX. MH DETAIL (STA 9+95.00 ~ L1)
B EX. MH DETAIL (STA 18+82.35 ~ L7)
MONUMENTATION NOTE
STORMWATER MANAGEMENT & EROSION CONTROL PLAN NOTE
55075 8-5-26
10/27/2026 C3 387 of 424
CITY of VISTA
M
A
T
C
H
L
I
N
E
-
S
E
E
T
O
P
R
I
G
H
T
M
A
T
C
H
L
I
N
E
-
S
E
E
B
O
T
T
O
M
L
E
F
T
1042 S. SANTA FE DR.
APN: 180-310-10
1050 S. SANTA FE DRIVE
APN: 180-310-11
1070 S. SANTA FE DRIVE
APN: 180-310-15
1031 S. SANTA FE DRIVE
APN: 180-330-03
1051 S. SANTA FE DRIVE
APN: 180-330-04
1085 S. SANTA FE DRIVE
APN: 180-330-07
1094 S. SANTA FE DRIVE
APN: 180-320-03
1112 S. SANTA FE DRIVE
APN: 180-163-05
1082 S. SANTA FE DRIVE
APN: 180-320-17
S. SANTA FE DRIVE
APN: 180-330-10
1121 S. SANTA FE DRIVE
APN: 180-330-13
1115 S. SANTA FE DRIVE
APN: 180-330-12
55075 8-5-26
10/27/2026 C3 388 of 424
CIP 8382 - NEW 10 INCH SEWER - PROFILE
375
380
385
390
395
400
405
410
375
380
385
390
395
400
405
410
SEWER DATA TABLE
CITY of VISTA
POTHOLE NOTE:
14 +
2 5
.
0 0
M
A
T
C
H
L
I
N
E
SE
E
S
H
E
E
T
5 1042 S. SANTA FE DR.
APN: 180-310-10
1050 S. SANTA FE DRIVE
APN: 180-310-11
1070 S. SANTA FE DRIVE
APN: 180-310-15
1031 S. SANTA FE DRIVE
APN: 180-330-03
1051 S. SANTA FE DRIVE
APN: 180-330-04
” ”
CONSTRUCTION NOTES
55075 8-5-26
10/27/2026 C3 389 of 424
CIP 8382 - NEW 10 INCH SEWER - PROFILE
390
395
400
405
410
415
420
390
395
400
405
410
415
420
SEWER DATA TABLE
SEWER DATA TABLE
CITY of VISTA
” ”
CONSTRUCTION NOTES
POTHOLE NOTE:
14 +
2 5
.
0 0
M
A
T
C
H
L
I
N
E
SE
E
S
H
E
E
T
4 1085 S. SANTA FE DRIVE
APN: 180-330-07
1094 S. SANTA FE DRIVE
APN: 180-320-03
1112 S. SANTA FE DRIVE
APN: 180-163-05
1082 S. SANTA FE DRIVE
APN: 180-320-17
S. SANTA FE DRIVE
APN: 180-330-10
1121 S. SANTA FE DRIVE
APN: 180-330-13
1115 S. SANTA FE DRIVE
APN: 180-330-12
55075 8-5-26
10/27/2026 C3 390 of 424
CITY of VISTA
TRAFFIC STRIPING NOTES
SURFACE IMPROVEMENT NOTES
M
A
T
C
H
L
I
N
E
-
S
E
E
T
O
P
R
I
G
H
T
M
A
T
C
H
L
I
N
E
-
S
E
E
B
O
T
T
O
M
L
E
F
T
1050 S. SANTA FE DRIVE
APN: 180-310-11 1070 S. SANTA FE DRIVE
APN: 180-310-15
1031 S. SANTA FE DRIVE
APN: 180-330-03
1051 S. SANTA FE DRIVE
APN: 180-330-04
1085 S. SANTA FE DRIVE
APN: 180-330-07
1094 S. SANTA FE DRIVE
APN: 180-320-03 1112 S. SANTA FE DRIVE
APN: 180-163-051082 S. SANTA FE DRIVE
APN: 180-320-17
S. SANTA FE DRIVE
APN: 180-330-10
1121 S. SANTA FE DRIVE
APN: 180-330-13
1115 S. SANTA FE DRIVE
APN: 180-330-12RESTRIPING NOTES
55075 8-5-26
10/27/2026 C3 391 of 424
10/27/2026 C3 392 of 424
10/27/2026 C3 393 of 424
10/27/2026 C3 394 of 424
10/27/2026 C3 395 of 424
10/27/2026 C3 396 of 424
10/27/2026 C3 397 of 424
10/27/2026 C3 398 of 424
10/27/2026 C3 399 of 424
10/27/2026 C3 400 of 424
10/27/2026 C3 401 of 424
10/27/2026 C3 402 of 424
10/27/2026 C3 403 of 424
10/27/2026 C3 404 of 424
10/27/2026 C3 405 of 424
10/27/2026 C3 406 of 424
10/27/2026 C3 407 of 424
10/27/2026 C3 408 of 424
10/27/2026 C3 409 of 424
10/27/2026 C3 410 of 424
10/27/2026 C3 411 of 424
10/27/2026 C3 412 of 424
10/27/2026 C3 413 of 424
10/27/2026 C3 414 of 424
10/27/2026 C3 415 of 424
10/27/2026 C3 416 of 424
10/27/2026 C3 417 of 424
10/27/2026 C3 418 of 424
10/27/2026 C3 419 of 424
10/27/2026 C3 420 of 424
10/27/2026 C3 421 of 424
10/27/2026 C3 422 of 424
Bid Schedule
PRICE TABLES
Line Item Description Quantity Unit of Measure Unit Cost Total 1 Mobilization &
Demobilization (5%
maximum of Total Base
Bid)
1 LS $20,000.00 $20,000.00
2 Project Information Sign 1 EA $747.50 $747.50
3 Public Notification per
Supplementary General
Provisions, Section 3-11.2
(stipulated amount)
1 EA $1,000.00 $1,000.00
4 Storm Water Pollution
Prevention and Erosion
Control
1 LS $14,950.00 $14,950.00
5 Traffic Control and
Construction Staging
1 LS $26,450.00 $26,450.00
6 Utility Potholing 1 LS $16,100.00 $16,100.00
7 Survey Monument
Preservation (stipulated
amount)
1 EA $2,000.00 $2,000.00
8 Record Drawing (“As-
Built”) Plans (stipulated
amount)
1 EA $2,500.00 $2,500.00
9 Sewer Bypass Plan and
Implementation
1 LS $43,700.00 $43,700.00
10 Construction Staking 1 LS $2,400.00 $2,400.00
11 CCTV New Sewer Lines 1 LS $2,500.00 $2,500.00
12 10” PVC SDR-26 ASTM
F679 Sewer main includes
trenching, shoring,
bracing, and plating;
site/trench security and
necessary vehicle barriers
323 LF $212.75 $68,718.25
13 10” PVC SDR-35 ASTM
D3034 Sewer main
includes trenching,
shoring, bracing, and
plating; site/trench
security and necessary
vehicle barriers
499 LF $230.00 $114,770.00
14 10” PVC C900 DR14 Sewer
main includes trenching,
shoring, bracing, and
plating; site/trench
security and necessary
vehicle barriers
65 LF $257.60 $16,744.00
10/27/2026 C3 423 of 424
15 60" Armorock Sewer
Manhole w/ Armorock
Precast Base (or Approved
Equal) With 36” Frame
and Cover
6 EA $21,999.50 $131,997.00
16 Concrete Encasement of
New Sewer Main
85 LF $115.00 $9,775.00
17 2-Sack Slurry Backfill
(SDRSD G-36)
5 CY $517.50 $2,587.50
18 Re-channel & Rehabilitate
Existing Manhole Per CoV
SWR-33 w/ Raven 405
Epoxy Coating
2 EA $7,935.00 $15,870.00
19 Trench Resurfacing (COV
SRF-08A&B)
883 LF $32.20 $28,432.60
20 2” Cold Milling for Overlay
& HMA PG64-10 Overlay
(2-inch Thick) –
Intersection Monte Vista
and SSF
8762 SF $5.75 $50,381.50
21 Traffic Striping and
Pavement Markings
Restoration
1 LS $4,600.00 $4,600.00
22 Replace Traffic Signal
Loop Cable
1 LS $11,500.00 $11,500.00
23 Replace 10” Water Line
with 10” DR-14 PVC pipe
at Sta. 12+73.43
10 LF $494.50 $4,945.00
24 Replace 8” Water Line with
8” DR-14 PVC pipe at Sta.
18+53.81
10 LF $575.00 $5,750.00
Total $598,418.35
10/27/2026 C3 424 of 424