ACTION:
____________________________
Clerk/Secretary
Department: Engineering Item No: C4
Prepared by:
Jill Bankston, Principal Transportation Mobility Planner Erin Adams, Administrative Programs Manager Meeting Date: October 27, 2026 Approved by:
Matt Atteberry, Acting Director of Engineering
John Conley, City Manager Agenda Location: Consent Calendar SUBJECT: DESIGN FOR CIP 8407 – TRAFFIC SIGNAL ON N. SANTA FE AVENUE & ANGELES VISTA DRIVE AND CIP 8408 – TRAFFIC SIGNAL ON S. SANTA FE AVENUE & SANTA ANITA DRIVE – AWARD OF CONTRACT
RECOMMENDATION: Adopt City Council Resolution No. 2026- , approving a contract with General Technologies and Solutions, Inc. for engineering design services for a traffic signal on N. Santa Fe Avenue & Angeles Vista Drive (CIP No. 8407) and a traffic signal on S. Santa Fe Avenue & Santa Anita Drive (CIP No. 8408).
CORRELATION TO CITY COUNCIL GOALS: Traffic: Continue to enhance mobility safety, improve the flow of traffic for all forms of travel, reduce congestion and improve our roads and sidewalks.
PRIOR ACTION: On June 6, 2026, adopted City Council Resolution No. 2026-98, adopting a Capital Project Budget for Fiscal Years 2026/27 and 2027/28 (Vote: 5-0).
STATEMENT ON THE SUBJECT: As part of the Capital Improvement Program budget, the City Council approved funding for the design and construction of traffic signals at two intersections: N. Santa Fe Avenue & Angeles Vista Drive (CIP No. 8407) and S. Santa Fe Avenue & Santa Anita Drive (CIP No. 8408). The designs will be cyclist and pedestrian friendly including ADA curb ramps, crosswalks, signing and striping, fiber-optic interconnect, CCTV cameras, and traffic signal timing.
On July 22, 2026, the City issued a Request for Proposals (RFP) on the City’s procurement website and online procurement portal, OpenGov, for engineering design services for traffic signals at N. Santa Fe Avenue & Angeles Vista Drive (CIP No. 8407) and S. Santa Fe Avenue & Santa Anita Drive (CIP No. 8408).
The City received four proposals on August 19, 2026, from the following firms:
Company Name Location
General Technologies and Solutions, Inc. Encinitas, CA Parsons San Diego, CA
STC Traffic, Inc. Carlsbad, CA
TJKM Pleasanton, CA
Staff reviewed and ranked the proposals based upon pre-determined criteria identified in the RFP, including overall experience, understanding of objectives, and experience with similar projects. Staff also reviewed the proposed fee of the top candidate and negotiated a fair and reasonable fee for the proposed scope of AGENDA
REPORT
CITY COUNCIL
COMMUNITY DEVELOPMENT COMMISSION
SUCCESSOR AGENCY
BUENA SANITATION DISTRICT
JOINT POWERS FINANCING AUTHORITY
10/27/2026 C4 1 of 107
Approved above recommendation, adopted City Council Resolution No. 2026-180. Vote: 5-0
ACTION:
____________________________
Clerk/Secretary
Department: Engineering Item No: C4
Prepared by:
Jill Bankston, Principal Transportation Mobility Planner Erin Adams, Administrative Programs Manager Meeting Date: October 27, 2026 Approved by:
Matt Atteberry, Acting Director of Engineering
John Conley, City Manager Agenda Location: Consent Calendar
SUBJECT: DESIGN FOR CIP 8407 – TRAFFIC SIGNAL ON N. SANTA FE AVENUE & ANGELES VISTA DRIVE AND CIP 8408 – TRAFFIC SIGNAL ON S. SANTA FE AVENUE & SANTA ANITA DRIVE – AWARD OF CONTRACT
RECOMMENDATION: Adopt City Council Resolution No. 2026- , approving a contract with General Technologies and Solutions, Inc. for engineering design services for a traffic signal on N. Santa Fe Avenue & Angeles Vista Drive (CIP No. 8407) and a traffic signal on S. Santa Fe Avenue & Santa Anita Drive (CIP No. 8408).
CORRELATION TO CITY COUNCIL GOALS: Traffic: Continue to enhance mobility safety, improve the flow of traffic for all forms of travel, reduce congestion and improve our roads and sidewalks.
PRIOR ACTION: On June 6, 2026, adopted City Council Resolution No. 2026-98, adopting a Capital Project Budget for Fiscal Years 2026/27 and 2027/28 (Vote: 5-0).
STATEMENT ON THE SUBJECT: As part of the Capital Improvement Program budget, the City Council approved funding for the design and construction of traffic signals at two intersections: N. Santa Fe Avenue & Angeles Vista Drive (CIP No. 8407) and S. Santa Fe Avenue & Santa Anita Drive (CIP No. 8408). The designs will be cyclist and pedestrian friendly including ADA curb ramps, crosswalks, signing and striping, fiber-optic interconnect, CCTV cameras, and traffic signal timing.
On July 22, 2026, the City issued a Request for Proposals (RFP) on the City’s procurement website and online procurement portal, OpenGov, for engineering design services for traffic signals at N. Santa Fe Avenue & Angeles Vista Drive (CIP No. 8407) and S. Santa Fe Avenue & Santa Anita Drive (CIP No. 8408).
The City received four proposals on August 19, 2026, from the following firms:
Company Name Location
General Technologies and Solutions, Inc. Encinitas, CA Parsons San Diego, CA
STC Traffic, Inc. Carlsbad, CA
TJKM Pleasanton, CA
Staff reviewed and ranked the proposals based upon pre-determined criteria identified in the RFP, including overall experience, understanding of objectives, and experience with similar projects. Staff also reviewed the proposed fee of the top candidate and negotiated a fair and reasonable fee for the proposed scope of
AGENDA
REPORT
CITY COUNCIL
COMMUNITY DEVELOPMENT COMMISSION
SUCCESSOR AGENCY
BUENA SANITATION DISTRICT
JOINT POWERS FINANCING AUTHORITY
10/27/2026 C4 1 of 107
MEETING DATE: October 27, 2026 PAGE 2
SUBJECT: DESIGN FOR CIP 8407 – TRAFFIC SIGNAL ON N. SANTA FE AVENUE & ANGELES VISTA DRIVE AND CIP 8408 – TRAFFIC SIGNAL ON S. SANTA FE AVENUE & SANTA ANITA DRIVE – AWARD OF CONTRACT
work. Based on evaluation of the proposals, City staff recommend the selection of General Technologies and Solutions, Inc. (GTS) for engineering design services for a Traffic Signal on N. Santa Fe Avenue & Angeles Vista Drive (CIP No. 8407) and a Traffic Signal on S. Santa Fe Avenue & Santa Anita Drive (CIP No. 8408).
The design contract with GTS in the amount of $190,080 will produce a complete design package with plans, specifications, and a cost estimate for construction of the proposed traffic signals at these two intersections.
FISCAL IMPACT: The cost for GTS to design the two traffic signals is $190,080. Funding is budgeted and available in the Fiscal Years 2026/27 and 2027/28 Capital Improvement Budgets in CIP No. 8407, Source Appropriation Account (No. 1106595.578999.8407), and CIP No. 8408, Source Appropriation Account (No. 1106595.578999.8408).
EXHIBITS:
1. City Council Resolution 2026- , approving a contract with General Technologies and Solutions, Inc. for engineering design services for a traffic signal on N. Santa Fe Avenue & Angeles Vista Drive (CIP No. 8407) and a traffic signal on S. Santa Fe Avenue & Santa Anita Drive (CIP No. 8408)
2. Contract with General Technologies and Solutions, Inc.
10/27/2026 C4 2 of 107
RESOLUTION NO. 2026-
A RESOLUTION OF THE CITY COUNCIL OF THE CHARTERED CITY OF
VISTA, CALIFORNIA, APPROVING A CONTRACT WITH GENERAL
TECHNOLOGIES AND SOLUTIONS, INC. FOR ENGINEERING DESIGN SERVICES FOR A TRAFFIC SIGNAL ON N. SANTA FE AVENUE & ANGELES VISTA DRIVE (CIP NO. 8407), AND A TRAFFIC SIGNAL ON S. SANTA FE AVENUE & SANTA ANITA DRIVE (CIP NO. 8408)
The City Council of the City of Vista does resolve as follows:
1. Findings. The City Council hereby finds and declares the following:
A. Pursuant to section 3.08.060B of the Vista Municipal Code, a request for proposals (RFP) was issued on July 22, 2026.
B. Four proposals were submitted in response to the RFP and were evaluated based upon the predetermined set of criteria identified in the RFP.
C. Staff recommends the selection of General Technologies and Solutions, Inc. for engineering design services for a traffic signal on N. Santa Fe Avenue & Angeles Vista Drive (CIP No. 8407), and a traffic signal on S. Santa Fe Avenue & Santa Anita Drive (CIP No. 8408).
2. Action.
A. The contract between the City of Vista and General Technologies and Solutions, Inc. for engineering design services for a traffic signal on N. Santa Fe Avenue & Angeles Vista Drive (CIP No. 8407), and a traffic signal on S. Santa Fe Avenue & Santa Anita Drive (CIP No. 8408) is approved, and the Mayor is authorized to execute the contract.
3. Adoption. PASSED AND ADOPTED at a meeting of the City Council of the City of Vista held on October 27, 2026, by the following vote:
AYES:
NOES:
ABSTAIN:
APPROVED AS TO FORM:
WALTER CHUNG, CITY ATTORNEY
By:
APPROVED
Walter C. Chung
20261018170315
JOHN B. FRANKLIN, MAYOR
ATTEST:
KATHY VALDEZ, CITY CLERK
By:
10/27/2026 C4 3 of 107
EXHIBIT 1
Professional Services (Non-Construction) (RFP)(PW)
1 of 10
General Technologies and Solutions, Inc.
[51960-2] 00051960 4
CONTRACT FOR PROFESSIONAL SERVICES
FOR DESIGN OF TRAFFIC SIGNAL AT N. SANTA FE AVENUE AND
ANGELES VISTA DRIVE (CIP NO. 8407) AND TRAFFIC SIGNAL AT S.
SANTA FE AVENUE AND SANTA ANITA DRIVE (CIP NO. 8408)
THIS “CONTRACT” is entered into by and between the “Parties” as of ___________________ (“Contract Date”).
1.0 THE “PARTIES”
The “City”:
CITY OF VISTA, a chartered municipal
corporation
200 Civic Center Drive
Vista, CA 92084
Working Contact: Jill Bankston
Billing Contact: Erin Adams
The “Contractor”
GENERAL TECHNOLOGIES AND
SOLUTIONS, INC., a California corporation
531 Encinitas Blvd., Suite 202
Encinitas, CA 92024
Contact: Rawad Hani
2.0 BASIC TERMS
2.1 The “Services” to be performed by Contractor are set forth in the Request for Proposals attached as Exhibit A.
2.2 The “Required License” for the Services is: California Professional Engineer.
2.3 Contractor, an entity holding the Required License, desires to enter into this “Contract” with City for the Services.
2.4 The “Project” for which the Services are required is described in Exhibit A.
2.5 Contractor has submitted to City a Proposal to perform the Services dated August 19, 2026 (“Exhibit B”).
2.6 The “Contract Ceiling Price” is: $190,080.
2.7 Any references in Exhibit A or Exhibit B to “Consultant” shall mean Contractor for the purposes of this Contract.
2.8 This Contract requires the payment of prevailing wages. As a condition precedent to the effectiveness of this Contract, the Contractor shall execute and deliver to City the Labor Law Compliance Form (Exhibit D).
3.0 CONTRACT TERM
3.1 This Contract shall take effect as of the Contract Date.
3.2 This Contract shall be in effect for 12 calendar months (“Term”) from the Contract Date. The Term may be extended at the City’s option for an additional 18 months, in increments of City’s choice, for a maximum Term of 30 months from the Contract Date. 10/27/2026 C4 4 of 107
EXHIBIT 2
Professional Services (Non-Construction) (RFP)(PW) 2 of 10 General Technologies and Solutions, Inc. [51960-2] 00051960 4
3.3 City may terminate this Contract upon 30-days’ written notice to Contractor. In such event, or upon request of City, Contractor shall assemble all City documents in the Contractor's possession, put them in order for proper filing and closing, and deliver the documents to City. In the event of termination, Contractor shall be paid for work performed to the termination date. City shall make the final determination as to the portion of tasks completed and the compensation to be paid.
4.0 SCOPE
Contractor shall perform all Services including, but not limited to, the furnishing of all tools, equipment, materials, software, and supplies, and for furnishing all transportation, services, including fuel, power and water, essential communications, and the performance of all labor, work, or other operations, as may be required from time to time, in accordance with Exhibit A and Exhibit B. In the event of a conflict between the provisions of Exhibit A and Exhibit B, the provisions of Exhibit A shall control.
5.0 COMPENSATION
5.1 City shall pay Contractor for the Services to be performed as set forth in Exhibit B.
5.2 An invoice for payment shall be submitted in a form satisfactory to City. At a minimum, the invoice shall include: the purchase order number, the work order number, a description of the work performed, and a total amount.
5.3 Changes in, additions to, or deductions from the Services, including increases or decreases in any item or portion of the Services, shall be set forth in a written change order executed by City and by the Contractor which shall specify:
5.3.1 The changes, additions, and deductions to be made.
5.3.2 The increase or decrease in compensation due the Contractor, if any.
5.3.3 Adjustment in the time of completion, if any.
5.4 Contract Ceiling Price
5.4.1 In no event shall City be liable for paying more than the Contract Ceiling Price for Contractor's services rendered under this contract.
5.4.2 If it becomes foreseeable that Contractor will need to perform services such that the cumulative total of costs to City will exceed the maximum permitted by this Contract, any such cost overrun will be handled pursuant to the change order procedure in Vista Municipal Code Chapter 3.08. City and Contractor recognize that City lacks authority to exceed the cost ceiling without the express authorization of the City Council. If the maximum cost to City for this Contract is exceeded unexpectedly, payment shall be made as mutually agreeable and disputes shall be handled pursuant to this Contract, but work shall cease as soon as is reasonably feasible once the cost ceiling plus allowable change orders, if any, is exceeded.
10/27/2026 C4 5 of 107
Professional Services (Non-Construction) (RFP)(PW) 3 of 10 General Technologies and Solutions, Inc. [51960-2] 00051960 4
5.5 Except as provided in Exhibit B, Contractor shall not be reimbursed for any expenses incurred in rendering services under this Contract.
6.0 CONTRACT DOCUMENTS
The Contract comprises the following documents including all additions, deletions, modifications, and appendices and all addenda setting forth any modifications or interpretations of any these documents: Documents required under Exhibits A–E.
7.0 TIME FOR COMPLETION AND COMMENCEMENT OF SERVICES
All Services under the Contract must be completed in compliance with the schedule in Exhibit A.
8.0 STANDARD OF PERFORMANCE
8.1 Contractor represents and warrants that it has the training, qualifications, experience, and facilities necessary to properly perform the Services required under this Contract in a thorough, competent, and professional manner. At all times Contractor shall faithfully, competently and to the best of its ability, experience, and talent, perform all services described herein. In meeting its obligations under this Contract, Contractor shall employ, at a minimum, generally accepted standards and practices utilized by persons engaged in providing services similar to those required of Contractor under this Contract.
8.2 Contractor shall keep itself informed of and comply with all applicable federal, state, and local laws, statutes, codes, ordinances, regulations, and rules in effect during the Term of this Contract. Contractor shall obtain any and all licenses, permits and authorizations necessary to perform the services set forth in this Contract, including any business licenses required by City. Neither City, nor any elected or appointed boards, officers, officials, employees, or agents of City, shall be liable, at law or in equity, as a result of any failure of Contractor to comply with this Section.
9.0 CONTRACTOR’S STATUS; CONTRACTOR’S EMPLOYEES
9.1 Contractor shall perform the services provided for herein in Contractor's own way as an independent contractor and in pursuit of Contractor's independent calling. Contractor is not to be considered an employee of City, nor shall any employees of Contractor be considered employees of City, for any purpose. Contractor shall be under the direction and control of City staff only as to the results to be accomplished. This Contract is not intended to create the relationship of partnership, joint venture, or association between City and Contractor.
9.2 Contractor represents and warrants that all professional services required under this Contract shall be provided by a person or persons duly licensed by the State of California to provide those types of services.
9.3 Neither Contractor, nor any of Contractor's officers, employees, or agents, shall obtain any rights to retirement, health care or any other benefits which may otherwise accrue to City’s employees. Contractor expressly waives any claim Contractor may have to any such rights.
9.4 Contractor is aware of the requirements of the Immigration Reform and Control Act of 1986 and shall comply with those requirements, including, but not limited to, verifying the 10/27/2026 C4 6 of 107
Professional Services (Non-Construction) (RFP)(PW) 4 of 10 General Technologies and Solutions, Inc. [51960-2] 00051960 4
eligibility for employment of all of Contractor’s officers, employees, agents, and subcontractors that are included in this Contract.
9.5 The payment made to Contractor pursuant to this Contract shall be the full and complete compensation to which Contractor and Contractor’s officers, employees, agents, and subcontractors are entitled for performance of any work under this contract. Neither Contractor nor Contractor’s officers or employees are entitled to any salary or wages, or retirement, health, leave or other fringe benefits applicable to employees of the City. City will not make any federal or state tax withholdings on behalf of Contractor. City shall not be required to pay any workers' compensation insurance on behalf of Contractor.
9.6 Contractor agrees to defend and indemnify City for any obligation, claim, suit, or demand for tax, retirement contribution including any contribution to the Public Employees Retirement System (PERS), social security, salary or wages, overtime payment, or workers' compensation payment which City may be required to make on behalf of Contractor or any employee of Contractor, or any employee of Contractor construed to be an employee of City, for work done under this contract. This is a continuing obligation that survives the termination of this Contract.
10.0 CIVIL RIGHTS
10.1 Contractor agrees to comply with Title VII of the Civil Rights Act of 1964, as amended, the California Fair Employment Practices Act, the Americans with Disabilities Act of 1990, any other applicable federal and state laws and regulations hereinafter enacted.
10.2 Contractor shall not knowingly deny an opportunity or benefit, discriminate against or harass, any employee or applicant for employment on account of the person’s race, color, ethnicity, national origin, ancestry, religion, creed, veteran status, physical disability, mental disability, medical condition, marital status, sex, sexual orientation, age, or other status protected from workplace discrimination by state or federal law.
10.3 Contractor shall not knowingly give preferential treatment to any applicant for employment on the basis of race, color, ethnicity, national origin, ancestry, religion, creed, physical disability, mental disability, medical condition, marital status, sex, or sexual orientation.
10.4 This section shall be interpreted in a manner that is consistent with the California and United States Constitutions and applicable state and federal statutes governing workplace discrimination. The terms used in this section shall have the same meaning as defined in state statutes governing the same subject matter.
10.5 Nothing in this section shall be interpreted as prohibiting bona fide occupational qualifications consistent with applicable state and federal law and reasonably necessary to the normal operation of Contractor. Nothing in this section shall be interpreted as prohibiting regulations and policies to prevent nepotism or conflicts of interest.
10.6 Nothing in this Section shall be interpreted as prohibiting action taken to establish or maintain eligibility for any federal program, where ineligibility would result in a loss of federal funds to City.
10.7 To the fullest extent permitted by law and without limitation by the other provisions of this Contract relating to indemnification and insurance, Contractor shall also 10/27/2026 C4 7 of 107
Professional Services (Non-Construction) (RFP)(PW) 5 of 10 General Technologies and Solutions, Inc. [51960-2] 00051960 4
indemnify, defend, and hold harmless City, and its directors, officers, employees, and agents from and against all liability (including without limitation all claims, damages, penalties, fines, and judgments, associated investigation and administrative expenses, and defense costs, including but not limited to reasonable attorneys' fees, court costs, and costs of alternative dispute resolution) resulting from any claim of discrimination or harassment, including but not limited to sexual harassment, arising from the conduct of the Contractor or any of the Contractor’s officers, employees, agents, licensees, or subcontractors. In the event of a discrimination or harassment complaint against any employee, agent, licensee, or subcontractors of Contractor or its subcontractors, Contractor shall take immediate and appropriate action in response to such complaint, including, but not limited to termination or appropriate discipline of any responsible employee, agent, licensee, or subcontractors. The provisions of this Section survive completion of the services or termination of the Contract.
11.0 CONTROL OF SERVICES
Each Party shall appoint a representative who shall have the authority to represent and act for that Party (“Representative”). Any written or verbal directions or requests of City's Representative delivered to the Contractor’s Representative shall have the same force and effect as if delivered to the Contractor. The Contractor's Representative shall have the authority to sign any change order, coordinate the work of all subcontractors and make other decisions pertaining to the Contract.
12.0 ASSIGNMENT AND SUBCONSULTING
12.1 Neither this Contract nor any interest herein may be transferred, assigned, conveyed, hypothecated, or encumbered voluntarily or by operation of law, whether for the benefit of creditors or otherwise, without the prior written approval of the City. Transfers restricted hereunder shall include the transfer to any person or group of persons acting in concert of more than twenty-five (25%) of the present ownership and/or control of Contractor, taking all transfers into account on a cumulative basis. In the event of any such unapproved transfer, including any bankruptcy proceeding, this Contract shall be void. No approved transfer shall release the Contractor or any surety of Contractor of any liability hereunder without the express consent of City.
12.2 Contractor shall be fully responsible to the City for any acts and omissions of Contractor's subcontractor, including persons either directly or indirectly employed by subcontractor, in the event Contractor subcontracts any of the work to be performed under this contract. Contractor's responsibility under this paragraph shall be identical to Contractor's liability for acts and omissions of Contractor and employees of the Contractor. Nothing contained in this Contract shall create any contractual relationship between City and any subcontractor of Contractor, but Contractor shall bind every subcontractor and every subcontractor of a subcontractor by the terms of this contract applicable to Contractor's work, unless such change, omission, or addition is approved in advance in writing by the City Manager or the City Manager’s designee. All subcontractors are subject to the prior written review and approval of the City Manager or the City Manager’s designee.
13.0 LICENSES
If a license of any kind, which term is intended to include evidence of registration, is required of Contractor, its employees, agents, or subcontractors by federal, state, or local law, Contractor warrants that such license has been obtained, is valid and in good standing, and that any required bond has been posted in accordance with all applicable laws and regulations. 10/27/2026 C4 8 of 107
Professional Services (Non-Construction) (RFP)(PW) 6 of 10 General Technologies and Solutions, Inc. [51960-2] 00051960 4
14.0 FINANCIAL RECORDS
14.1 Contractor shall maintain any and all documents, ledgers, books of account, invoices, vouchers, canceled checks, or records demonstrating or relating to Contractor’s performance of services pursuant to this Contract or evidencing or relating to expenditures and disbursements charged to City pursuant to this Contract. Any and all such documents or records shall be maintained in accordance with generally accepted accounting principles and shall be sufficiently complete and detailed so as to permit an accurate evaluation of the services provided by Contractor pursuant to this Contract. Any and all such documents or records shall be maintained for three years from the date of execution of this Contract and to the extent required by laws relating to audits of public agencies and their expenditures. It is expressly understood and agreed that the provisions of this Section will survive termination of this Contract.
14.2 Any and all records or documents required to be maintained pursuant to this Section shall be made available for inspection, audit and copying, at any time during regular business hours, upon request by City or its designated representative. Copies of such documents or records shall be provided directly to the City for inspection, audit and copying when it is practical to do so; otherwise, unless an alternative is mutually agreed upon, such documents and records shall be made available at Contractor's address indicated for receipt of notices in this Contract or the primary location from which services are rendered, whichever is closer.
15.0 OWNERSHIP OF DOCUMENTS
Upon delivery, the work product, including without limitation, all original reports, writings, recordings, drawings, files, and detailed calculations developed under this contract are the property of City. Contractor agrees that all copyrights which arise from creation of the work pursuant to this contract shall be vested in City and waives and relinquishes all claims to copyright or other intellectual property rights in favor of City. City acknowledges that its use of the work product is limited to the purposes contemplated by the scope of Services and that Contractor makes no representation of the suitability of the work product for use in or application to circumstances not contemplated by the scope of Services.
16.0 CONFIDENTIALITY
16.1 Contractor shall treat all information obtained from City in the performance of this Contract as confidential and proprietary to City. Contractor shall treat all records and work product prepared or maintained by Contractor in the performance of this Contract as confidential.
16.2 Contractor agrees that it will not use any information obtained as a consequence of the performance of work for any purpose other than fulfillment of Contractor’s scope of Services. Contractor will not disclose any information prepared for City, or obtained from City or obtained as a consequence of the performance of work to any person other than City, or its own employees, agents or subcontractors who have a need for the information for the performance of Services under this Contract unless such disclosure is specifically authorized in writing by City.
16.3 Contractor’s obligations under this paragraph shall survive the termination of this Contract.
10/27/2026 C4 9 of 107
Professional Services (Non-Construction) (RFP)(PW) 7 of 10 General Technologies and Solutions, Inc. [51960-2] 00051960 4
17.0 CONFLICT OF INTEREST REQUIREMENT
Contractor agrees that, to the extent applicable, it shall comply with and be bound by all laws and regulations deriving from the relationship of the Contractor to the City, including the Political Reform Act (Government Codes Section 87100 et seq.) Chapters 2.32 or 2.33 of the Vista Municipal Code, the Community Redevelopment Act (Health & Safety Code 33000 et seq.) and all regulations promulgated thereunder (collectively “Conflict Laws”). As a condition precedent to the formation of this Contract, Contractor warrants and covenants that it is adequately informed regarding the obligations and duties imposed by the Conflict Laws and that to the best of Contractor's knowledge and belief, there exists no conflict of interest (under the laws) that would disqualify the Contractor from participation in any decisions arising out of the performance of this Contract. Prior to commencement of any work in the performance of this Contract, Contractor shall comply with any applicable requirements of Chapter 2.32 of the Vista Municipal Code, including any requirement to file a financial disclosure statement with the City Clerk.
Contractor further agrees that no employee, agent or subcontractor for Contractor shall perform any work for the City pursuant to this Contract which will violate the Conflict Laws.
18.0 PROHIBITION OF FINANCIAL INTEREST BY CITY OFFICIAL Contractor warrants and covenants to City that no City Official has or will have any current or future financial interest in this Contract as of the date approved, nor shall Contractor promise, offer, or enter into any written, oral or implied Contract, to provide any financial interest or remuneration of any kind or manner to any City official with respect to this Contract. For purposes of this Section, the term “City Official” shall mean and include any elected or appointed officer of City, any employee of City, or any spouse or financial dependent of a City official or employee. A violation of this provision shall render this Contract null and void and Contractor shall be subject to restitution of all fees or money paid or earned under this Contract.
19.0 INDEMNIFICATION
Other than in the performance of Design Professional services, which shall be solely addressed as in Section 19.1 below, to the fullest extent permitted by law, Contractor shall defend, indemnify and hold City and its officers, officials, employees, and volunteers harmless against any and all liability, loss, damage, fine, penalty, expense, claim or cost (including without limitation costs and fees of litigation) of every nature (collectively, “Liability”) arising out of or in connection with Contractor’s performance under this Contract, including defects in design, except: (1) Liability caused by City's sole negligence or willful misconduct; or (2) for Liability caused by City's active negligence, in which case the indemnity received by City shall be reduced by the amount: (i) that City's active negligence contributed to the Liability on a comparative basis; or (ii) such other amount as may be required by law (“Duty of Indemnification”).
19.1 To the fullest extent permitted by law (including, without limitation, California Civil Code Section 2782.8), with respect to the performance of Design Professional services, Contractor shall indemnify and hold harmless the City and its officers, officials, employees and volunteers harmless against all claims, demands or liability that arise out of, pertain to, or relate to the negligence, recklessness, or willful misconduct of Contractor in the performance of Design Professional services under this Contract. In relation to Design Professional services, in no event shall the cost to defend charged to Contractor exceed the Contractor’s proportionate percentage of fault.
10/27/2026 C4 10 of 107
Professional Services (Non-Construction) (RFP)(PW) 8 of 10 General Technologies and Solutions, Inc. [51960-2] 00051960 4
19.2 The review, acceptance or approval of Contractor’s work or work product by any indemnified party shall not affect, relieve, or reduce Contractor’s indemnification or defense obligations. This Section survives completion of the services or the termination of this contract.
The provisions of this Section are not limited by and do not affect the provisions of this contract relating to insurance.
20.0 INSURANCE AND BONDS
Contractor shall comply with the insurance provisions set forth in Exhibit C.
21.0 SERVICE OF NOTICE
21.1 Any notice, which either Party may desire to give to the other Party, must be in writing and may be given by personal delivery to the Party’s Representative or by overnight courier service to the Party’s address set forth in Section 1.0. Notice may also be given by mailing it by registered or certified mail, return receipt requested, to the other Party at the address set forth in Section 1.0. Any notice given by mail will be deemed given 48 hours after such notice is deposited in the United States mail, addressed as provided with postage fully prepaid.
21.2 A Party may change its address by giving notice as provided above, and the changed address shall thereafter be deemed to be the address set forth in Section 1.0.
22.0 SPECIAL PROVISIONS
This Contract is subject to, and Contractor shall comply with, the special provisions referenced in Exhibit E, if any.
23.0 EXHIBITS
All documents referenced as exhibits in this Contract, or referenced in an exhibit to this Contract, are incorporated herein.
24.0 APPLICABLE LAW, VENUE
This Contract shall be construed and enforced under the laws of the State of California. If any action is commenced by any Party to this Contract, such action shall be filed in a court of competent jurisdiction within the County of San Diego, California.
25.0 PREVAILING WAGES
Pursuant to Section 1781 of the Labor Code, Contractor is advised that certain work contemplated in this contract may be subject to the payment of prevailing wages and all other requirements of the Prevailing Wage Law. The prevailing wage of each job classification may be found by inquiry with the California Department of Industrial Relations. Contractor shall comply with all laws related to the performance of public work including, but not limited to, the employment of apprentices pursuant to Section 1777.5 of the Labor Code, work day/week hours and overtime rates pursuant to Sections 1813 and 1815 of the Labor Code and the obligation set forth in Sections 1774–1776 of the Labor Code in regards to payment of prevailing wages and to provide the City and the Department of Industrial Relations certified payrolls when required. A certified copy of all payroll records relative to this project shall be submitted to the City along with the related invoice. Receipt of certified payroll records is a prerequisite to receiving payment.
10/27/2026 C4 11 of 107
Professional Services (Non-Construction) (RFP)(PW) 9 of 10 General Technologies and Solutions, Inc. [51960-2] 00051960 4
No Contractor or sub-Contractor may be listed on a bid proposal for a public works project unless registered with the Department of Industrial Relations pursuant to Labor Code Section 1725.5. No Contractor or sub-Contractor may be awarded a contract for public work on a public works project unless registered with the Department of Industrial Relations pursuant to Labor Code Section 1725.5. All Contractors and sub-Contractors must furnish electronic certified payroll records to the Labor Commissioner. This requirement applies to all public works projects, whether new or ongoing. Contractor is further advised that any prevailing wage work contemplated herein is subject to compliance monitoring and enforcement by the Department of Industrial Relations.
26.0 COUNTERPARTS; ELECTRONIC SIGNATURES; ELECTRONIC DELIVERY This Agreement may be executed in separate counterparts, none of which need contain the signatures of both Parties, and each of which, when so executed, shall be deemed an original and all together shall constitute and be one of the same instrument. The Parties agree that this Agreement, whether executed by electronic signature, digital signature, or constituting a scanned or electronically reproduced copy or image of this Agreement bearing the signatures of the Parties, will be deemed an original and will represent competent evidence of the execution, terms and existence of this Agreement notwithstanding the failure or inability to produce an original executed Agreement or counterpart thereof, and without the requirement that the unavailability of such original executed Agreement or counterpart thereof first be proven.
Further, the exchange of this entire executed Agreement (and/or such exhibit(s) or document(s)) that is in photostatic or portable document format (.pdf) form by electronic mail or by another electronic means shall be considered original(s) and shall constitute effective execution and delivery of the original(s).
27.0 MODIFICATIONS
This Contract contains the entire agreement, between the Parties and supersedes all prior negotiations, discussions, obligations, and rights of the Parties in respect of each other regarding the subject matter of this Contract. There is no other written or oral understanding between the Parties. No modification, amendment or alteration of this Contract shall be valid unless it is in writing and signed by all Parties.
[Continued on page 10.]
10/27/2026 C4 12 of 107
Professional Services (Non-Construction) (RFP)(PW) 10 of 10 General Technologies and Solutions, Inc. [51960-2] 00051960 4
28.0 EXECUTION
IN WITNESS WHEREOF; the Parties hereto have executed this Contract as of the Contract Date.
“City”
CITY OF VISTA, a chartered municipal
corporation
By:
JOHN B. FRANKLIN, MAYOR
ATTEST:
KATHY VALDEZ, CITY CLERK
By:
APPROVED AS TO FORM:
WALTER CHUNG, CITY ATTORNEY
By:
RISK MANAGEMENT REVIEW:
ANALISA HOLBROOK, RISK MANAGER
By:
APPROVED
Amanda L. Guy
20260930121426
“Contractor”
GENERAL TECHNOLOGIES AND
SOLUTIONS, INC., a California corporation
By:
Name/Title
By:
Name/Title
10/27/2026 C4 13 of 107
00051960 4 Exhibit A
EXHIBIT A
REQUEST FOR PROPOSALS
10/27/2026 C4 14 of 107
ADDENDUM NO. 1
Traffic Signal Design for CIP No. 8407: N. Santa Fe Avenue & Angeles Vista Drive Traffic Signal and CIP No. 8408:
S Santa Fe Avenue & Santa Anita Drive Traffic Signal
CIP No. 8407 & 8408 – Addendum 1
July 28, 2026
ADDENDUM NO. 1
To the RFP for:
CITY OF VISTA: TRAFFIC SIGNAL DESIGN FOR CIP No. 8407: N SANTA FE AVE & ANGELES VISTA DR, AND TRAFFIC SIGNAL DESIGN FOR CIP No. 8408: S SANTA FE AVE & SANTA ANITA DR
City of Vista
200 Civic Center Drive
Vista, CA 92084-6240
To All RFP Document Holders of Record: All data, information, scope, term, concepts and proposal directives remain unchanged except the sections or parts of sections added to, revised, deleted or clarified by this Addendum as detailed below.
CHANGES TO THE REQUEST FOR PROPOSAL DOCUMENTS AND TERMS
On page 14, under Section XVI: ESTIMATED TIMELINE, change item number 3 to read:
3. Proposals Due August 12, 2026 at 4:00 PM
Prospective Bidders shall acknowledge their receipt of this Addendum No. 1 and its incorporation into the bid submitted by executing this document in the designated space below and submitting this document with their bid:
10/27/2026 C4 15 of 107
ADDENDUM NO. 1
Traffic Signal Design for CIP No. 8407: N. Santa Fe Avenue & Angeles Vista Drive Traffic Signal and CIP No. 8408:
S Santa Fe Avenue & Santa Anita Drive Traffic Signal
CIP No. 8407 & 8408 – Addendum 1
I hereby acknowledge that I have received Addendum No. 1 and its provisions have been incorporated into the attached bid proposal.
____________________________________________________________ By Date
____________________________________________________________ Company
10/27/2026 C4 16 of 107
ADDENDUM NO. 2
Traffic Signal Design for CIP No. 8407: N. Santa Fe Avenue & Angeles Vista Drive Traffic Signal and CIP No. 8408:
S Santa Fe Avenue & Santa Anita Drive Traffic Signal
CIP No. 8407 & 8408 – Addendum 2
August 4, 2026
ADDENDUM NO. 2
To the RFP for:
CITY OF VISTA: TRAFFIC SIGNAL DESIGN FOR CIP No. 8407: N SANTA FE AVE & ANGELES VISTA DR, AND TRAFFIC SIGNAL DESIGN FOR CIP No. 8408: S SANTA FE AVE & SANTA ANITA DR
City of Vista
200 Civic Center Drive
Vista, CA 92084-6240
To All RFP Document Holders of Record: All data, information, scope, term, concepts and proposal directives remain unchanged except the sections or parts of sections added to, revised, deleted or clarified by this Addendum as detailed below.
CHANGES TO THE REQUEST FOR PROPOSAL DOCUMENTS AND TERMS
On page 3, under Section III: PROPOSED SCOPE OF SERVICES, revise letter F to read:
Prepare 60%, 90% and Final Plans, Specifications and Estimates for construction of traffic signals and related infrastructure at N. Santa Fe Avenue/Angeles Vista Drive and S. Santa Fe Avenue/Santa Anita Drive. This signal design work includes connecting to existing fiber optic interconnect, ADA curb ramps including any utility relocations required and relocation/removal of obstructions, pedestrian facility improvements, signing & striping, and temporary erosion control.
As part of the signing and striping plans for the intersection of S. Santa Fe Avenue and Santa Fe Place, include a design to restrict egress from Santa Fe Place onto S. Santa Fe Avenue including a raised stamped concrete island on Santa Fe Place at S. Santa Fe Avenue, and appropriate signage and markings prohibiting turns from S. Santa Fe Avenue onto Santa Fe Place.
10/27/2026 C4 17 of 107
ADDENDUM NO. 2
Traffic Signal Design for CIP No. 8407: N. Santa Fe Avenue & Angeles Vista Drive Traffic Signal and CIP No. 8408:
S Santa Fe Avenue & Santa Anita Drive Traffic Signal
CIP No. 8407 & 8408 – Addendum 2
Prospective Bidders shall acknowledge their receipt of this Addendum No. 2 and its incorporation into the bid submitted by executing this document in the designated space below and submitting this document with their bid:
I hereby acknowledge that I have received Addendum No. 2 and its provisions have been incorporated into the attached bid proposal.
____________________________________________________________ By Date
____________________________________________________________ Company
10/27/2026 C4 18 of 107
ADDENDUM NO. 3
Traffic Signal Design for CIP No. 8407: N. Santa Fe Avenue & Angeles Vista Drive Traffic Signal and CIP No. 8408:
S Santa Fe Avenue & Santa Anita Drive Traffic Signal
CIP No. 8407 & 8408 – Addendum 3
August 6, 2026
ADDENDUM NO. 3
To the RFP for:
CITY OF VISTA: TRAFFIC SIGNAL DESIGN FOR CIP No. 8407: N. SANTA FE AVE. & ANGELES VISTA DR., AND TRAFFIC SIGNAL DESIGN FOR CIP No. 8408: S. SANTA FE AVE. & SANTA ANITA DR.
City of Vista
200 Civic Center Drive
Vista, CA 92084-6240
To All RFP Document Holders of Record: All data, information, scope, term, concepts and proposal directives remain unchanged except the sections or parts of sections added to, revised, deleted or clarified by this Addendum as detailed below.
CHANGES TO THE REQUEST FOR PROPOSAL DOCUMENTS AND TERMS
1. On page 2, under Section I: INTRODUCTION, replace the final sentence with the following:
Responses to this RFP will be accepted until 4:00 pm on Thursday, August 19, 2026.
2. On page 14, under Section XVI: ESTIMATED TIMELINE, replace number 3 with the following:
3. Proposals Due August 19, 2026, at 4:00 PM
3. On page 4, under Section III, PROPOSED SCOPE OF SERVICES, add the following under letter F, subpart ii:
10/27/2026 C4 19 of 107
ADDENDUM NO. 3
Traffic Signal Design for CIP No. 8407: N. Santa Fe Avenue & Angeles Vista Drive Traffic Signal and CIP No. 8408:
S Santa Fe Avenue & Santa Anita Drive Traffic Signal
CIP No. 8407 & 8408 – Addendum 3
Obtain pothole information for utility conflicts and adjust locations of facilities to avoid or minimize conflicts if possible. Request relocation of utility facilities where conflicts cannot be avoided. Obtain schedule of relocation design and construction from utility companies.
4. On page 5, under Section III, PROPOSED SCOPE OF SERVICES, add the following as new letter N:
N. Water Quality Technical Report: Prepare a Project Determination Checklist using the template provided by the City. The City of Vista has determined that the Urban Runoff Threat Assessment is “high” for all projects. If the project is determined to be a Standard or Priority Project, prepare a Stormwater Quality Management Plan (SWQMP) using the template provided by the City. Prepare Municipal Stormwater Permit documentation in accordance with San Diego Regional Water Quality Control Board Order No. R9-2013-0001/2015-0001, using the City of Vista BMP Design Manual. Determine applicable design requirements. Evaluate potential for any exemptions. Submit report to the City for review and make changes as requested by the City. Incorporate any required hydro-modification improvements and permanent BMP’s into the project design.
5. On page 5, under Section III, PROPOSED SCOPE OF SERVICES, add the following as new letter O:
O. Geotechnical Report: Perform a geotechnical investigation of on-site soil conditions to characterize soil conditions in the vicinity of signal pole foundations.
Testing shall determine shear strength, soil friction angle, minimum unit weight of the soil and depth to groundwater. Consultant shall prepare a geotechnical report with foundation recommendations, including lateral resistance analysis, torsional resistance analysis, and axial resistance analysis.
Prospective Bidders shall acknowledge their receipt of this Addendum No. 3 and its incorporation into the bid submitted by executing this document in the designated space below and submitting this document with their bid:
I hereby acknowledge that I have received Addendum No. 3 and its provisions have been incorporated into the attached bid proposal.
____________________________________________________________ By Date
____________________________________________________________ Company
10/27/2026 C4 20 of 107
REQUEST FOR PROPOSALS (RFP)
FOR PROFESSIONAL SERVICES
FOR
TRAFFIC SIGNAL DESIGN FOR
CIP NO. 8407: N. SANTA FE AVENUE & ANGELES VISTA DRIVE
TRAFFIC SIGNAL
CIP NO. 8408: S. SANTA FE AVENUE & SANTA ANITA DRIVE
TRAFFIC SIGNAL
Issue Date: July 22, 2026
Submittal Deadline: 4:00 PM, August 12, 2026
10/27/2026 C4 21 of 107
2 REQUEST FOR PROPOSALS
8407: N. SANTA FE AVENUE & ANGELES VISTA DRIVE TRAFFIC SIGNAL 8408: S. SANTA FE AVENUE & SANTA ANITA DRIVE TRAFFIC SIGNAL
I. INTRODUCTION
The City of Vista is requesting proposals from a qualified engineering firm or team to provide professional services for design surveying, underground utility survey, geotechnical investigation, engineering, electrical design, roadway design, striping, construction staking, construction material testing, and construction support for two traffic signals locations: N.
Santa Fe Avenue & Angeles Vista Drive, and S. Santa Fe Avenue & Santa Anita Drive.
All interested firms must have sufficient, readily available resources in the form of trained personnel, support services, specialized subconsultants, and financial resources to carry out the work without delay or shortcomings.
All Consultants must create an account on the City’s Electronic Bidding System, OpenGov Procurement to submit a proposal. Consultants can register using the ‘Sign Up’ link at the top of the page at:
City of Vista Procurement Portal
Once registered, Consultants must download this solicitation in order to appear on the Bidder’s List as a “Prospective Bidder.” Consultants that fail to specifically download this solicitation will not appear on the Bidders’ List and will be unable to participate or be considered for this RFP. See further instructions related to OpenGov Procurement under Section VII (Proposal) herein.
All notifications, updates and addenda will also be posted on this portal. Proposers shall be responsible for monitoring this portal to obtain information regarding this solicitation. Failure to respond to required updates may result in a determination of a nonresponsive proposal.
Responses to this RFP will be accepted until 4:00 pm on Thursday, August 12, 2026.
II. BACKGROUND AND PROJECT DESCRIPTION
The project generally consists of preparation of plans, specifications and a construction cost estimate for a traffic signal at the intersection of N. Santa Fe Avenue & Angeles Vista Drive, 10/27/2026 C4 22 of 107
3 and a traffic signal at the intersection of S. Santa Fe Avenue & Santa Anita Drive including safety luminaires, fiber optic interconnect, ADA compliant curb ramps, intersection asphalt repaving, signing & striping, and required pedestrian facilities for connectivity.
The following design objectives should be considered during the design development of this project:
1. Enhance safety, accessibility and multi-model transportation options
2. Minimize construction costs and long-term maintenance costs
3. Minimize impacts to traffic during construction
4. Minimize impacts to private property
5. Incorporate sustainable design principles and meet or exceed all stormwater regulations and requirements
III. PROPOSED SCOPE OF SERVICES
The selected consultant will be required to perform all work and services required to prepare a complete project design and specifications. The proposed scope and fee should be based on the tasks listed in the Scope of Work as detailed below.
A. Provide a project design and construction schedule with milestones.
B. Complete a record search with the City and utility companies.
C. Show all existing wet and dry utilities on traffic signal design plans.
D. Retain a professional survey team to perform horizontal and vertical site survey topography including intersection features and striping, drainage facilities needing replacement; and to locate the public right of way for the intersections, identify existing overhead wires that may be in conflict with traffic signal/luminaire poles and mast arms, and any vegetation or large trees that may be in conflict with proposed infrastructure.
E. Provide a conceptual, schematic 8.5” X 11” exhibit showing proposed signal phasing and signal indication layout. The intersections of N. Santa Fe Avenue & Angeles Vista Drive and S. Santa Fe Avenue & Santa Anita Drive are both three-way intersections.
F. Prepare 60%, 90% and Final Plans, Specifications and Estimates for construction of both traffic signals connecting to existing fiber optic interconnect, ADA curb ramps including any utility relocations required or relocation/removal of obstructions, pedestrian facility improvements, signing & striping and temporary erosion control. 10/27/2026 C4 23 of 107
4 Traffic Signals shall be designed in conformance with Attachment A, Guidelines for Traffic signal Design Plans. Each traffic signal will have its own design, specifications and construction cost estimate; and will have its own DWG number assigned by the City. Each design plan set will include:
i. Traffic Signal and Signing & Striping Sheets: The City will provide AutoCAD templates for traffic signal design and signing & striping sheets, which include border & title, and traffic signal and signing & striping design and notes.
ii. Traffic Signal Design Sheets: The traffic signal design will show all pertinent aspects of the signal design including existing utilities (including overhead), signal hardware, new conduits by directional boring, loop detection, phasing diagram, signal mast arm-mounted signs, streetlights as needed, tables and schedules, construction notes, etc.
The base map showing existing improvements (curb & gutter, sidewalk, curb ramps, striping, signing, etc.) will be obtained from the survey in Task D above.
The signal pole foundation and base plates are to be shown to scale in the exact location where they are to be built to ensure that they meet Caltrans standards and are within public right of way and not in conflict with existing utilities, curb ramps and other physical constraints.
The signal plan is to be drawn at 20 scale.
iii. Fiber-Optic Interconnect Design Sheet: This sheet will show fiber-optic interconnect equipment, design and construction notes to connect to the new traffic signal into the existing fiber-optic network. The City has the as-built drawings needed to complete this task.
iv. CCTV: Include one CCTV camera at each location and designating the specific corner where the camera will be installed for optimum visibility.
v. ADA Curb Ramps: New ADA compliant curb ramps, existing curb ramps in need of upgrade to current ADA standards, existing driveways and street entrances in need of upgrade to current ADA standards, must be schematically shown and called out on the signal design sheet.
vi. Signing & Striping: A signing and striping design sheet at 20 scale.
vii. Erosion Control Sheets: Erosion control sheets using City AutoCAD templates.
10/27/2026 C4 24 of 107
5 G. Traffic Signal Timing: Develop and test a complete signal timing plan to properly operate each traffic signal. The City uses Q-Free signal controllers with MaxTime signal timing software. The timing plan is to include coordination timing with the adjacent traffic signal intersections along the respective corridors.
H. Address all City comments on the 60%, 90% and Final Construction Documents. Sign and stamp the Final Construction documents by the engineering consultant as the engineer of work.
I. Compile the full project specifications for each signal location. The specifications will be created tailoring the City’s standard specifications from the City of Vista Master template for the project and adding the required technical specifications so that each item of work has a corresponding bid item and specification.
J. Prepare a detailed construction cost estimate based on construction bid items with quantities, units of measure and estimated unit costs.
K. Provide project management, administration, and coordination throughout the design phase of the Project.
L. Provide construction support including answers to bidder inquiries and RFIs, construction bid analysis, change order design, attending construction meetings, and preparing as-built drawings.
M. The City estimates that this contract, including overhead wire surveying, will not exceed $160,000.
The proposed scope shall be written to conform to these requirements. If the consultant identifies work items that should be included in the project, but cannot be accommodated within this budget, these items shall be identified in the Scope of Work and the costs separately delineated in the Fee Schedule.
IV. CITY RESPONSIBILITIES
The following is a list of the City’s responsibilities during the term of the agreement:
1. Provide all available plans, studies, reports, aerial photos, available LIDAR topographic information, and other pertinent records.
2. Coordinate access to the site for Consultant review prior to submittal of proposal.
3. Process and respond to requests to the City.
4. Provide contact information for both internal staff and external stakeholders. 10/27/2026 C4 25 of 107
6 5. Coordinate, notice, and schedule all public meetings, and meetings with City’s boards, Commissions, and City Council.
6. Prepare all administrative reports to City Commissions and City Council.
7. Provide meeting site arrangements for public meetings and workshops.
8. Review submittals from the Consultant in a timely manner.
9. Distribute public information through newsletters, mailings, email blasts, City website, City social media channels, and printed flyers.
10. Execute agreements with other agencies or entities.
11. Obtain and pay for all permits, agreements, and permissions for contract work on property not owned or controlled by the City.
12. Provide templates and examples of City plans and specifications to Consultant.
13. Provide utility company contact information for use in coordination.
14. Advertise and award construction contracts.
15. Administer construction contract.
V. COORDINATION
Coordination with the City, other City consultants, and other involved agencies is required to achieve compatible designs, phasing of construction with existing or design conditions, and timely delivery of the contract services. Coordination may include, but not be limited to, coordination with Vista Irrigation District, San Diego Regional Water Quality Control Board, San Diego Gas & Electric, and other organizations.
The City will decide the manner in which the coordination of individual matters is undertaken.
At the City’s option, coordination efforts may be performed by the Consultant’s direct contact, by the Consultant acting though the City or by the City only. When coordination efforts require agreement, such an agreement shall be coordinated through the City.
VI. PROJECT PROGRESS
The Contract shall begin upon approval by the City, and the Consultant shall commence work after notification to proceed by the City. Unless extended by contract amendment, the contract shall terminate upon acceptance by the City of the project as constructed and upon completion by the Consultant and approval of the City of the as-built plans.
The Consultant is advised that any recommendation for contract award is not binding on the City until the Agreement is fully executed and approved by the City.
Progress Review Meetings shall be held at intervals deemed appropriate by the City. At or before each of these meetings, the Consultant shall furnish two (2) copies of all completed or 10/27/2026 C4 26 of 107
7 partially completed work products which have been developed or altered since the last Progress Review Meeting.
Progress Reports shall be submitted at monthly intervals, indicating progress achieved during the reporting period in relation to the progress scheduled. The Consultant shall provide the City with the Progress Report at least four (4) working days before the Monthly Progress Meeting.
VII. PROPOSAL
All questions must be submitted via “Question & Answer” through the City’s Electronic Bidding System, OpenGov Procurement. Phone call questions will not be accepted. Answers to all submitted questions will be provided through OpenGov Procurement.
To receive addenda and submit a proposal, Consultants shall register on the City’s Electronic Bidding System at https://procurement.opengov.com/portal/cityofvista . Once registered, Consultants must download the RFP while logged in under their own name and identification number to appear on the Electronic Prospective Bidders List as a “Prospective Bidder.” Consultants that fail to download the RFP will not appear on the Electronic Prospective Bidders List and their proposals will be considered non-responsive. If a Consultant is unable to register or download the RFP from OpenGov Procurement, a Consultant representative may contact OpenGov Procurement to troubleshoot the problem.
All proposal documents and supplementary documents must be uploaded using OpenGov Procurement prior to event date and time as instructed in this solicitation. Once file(s) have been uploaded and the Submission Status shows as “Submitted” the submission is complete.
At that point respondents will receive an email confirmation from OpenGov Procurement.
OpenGov Procurement will determine the official time for the advertised proposal due date and such determination will be final. Any proposals not received in a timely manner on the Proposal Due Date, as described above, will not be considered.
Note: The City of Vista complies with the Americans with Disabilities Act. If you require reasonable accommodations, please contact the Office of the City clerk, 760-639-6125, at least forty-eight (48) hours prior to the bid opening.
REQUIREMENTS:
In order to maintain uniformity with all proposals furnished by Consultants, it is hereby requested the proposals be limited to a maximum of ten (10) pages (excluding front and back 10/27/2026 C4 27 of 107
8 covers, section dividers, Cover Letter, Fee Proposal, Work Schedule, sample Work Products, and resumes).
The Proposal should be formatted to fit on 8-1/2 x 11 pages. Larger pages up to 11 x 17 can be used for exhibits, such as a schedule, if needed to make the exhibits legible due to a substantial amount of detail. The page count is based on pages of information included in the RFP that indicate the Consultant’s qualifications. Proposals should include, at a minimum, the following elements:
1. COVER LETTER, which includes:
a. The name and address of the firm on formal letterhead, b. The name of the project, and
c. The name, title, and signature of an individual with authority to bind the Consultant.
2. STATEMENT OF QUALIFICATIONS, which includes:
a. A synopsis of the firm’s qualifications,
b. An Organization Chart showing the names, titles and classifications of key personnel, and project team relationships,
c. A staffing plan and descriptions of the qualifications of the Project team members; including the percentage of time each team member will devote to the project.
d. Resumes of key prime and subconsultant staff members assigned to the project, e. A list of similar contracts completed by the firm or team members within the last five (5) years. Include the project name; project description; location; role and level of involvement of the prime firm as well as any sub-consultants; design and/or construction dates of completion; bid costs vs. final construction costs, and client references with name, phone number and email address, and f. Information related to the financial responsibility of the firm.
3. WORK PLAN which describes:
a. The Consultant’s understanding of the project,
b. The approach and methodology to be used to accomplish the required services, and
c. The Consultant’s proposed Scope of Work based on the tasks listed above in this Request for Proposals, with suggested alternatives to the proposed tasks or deliverables that may improve upon achievement of the project objectives. The Consultant should clearly identify any proposed modifications to the tasks listed in the Scope of Work and explain the reason for the proposed change.
10/27/2026 C4 28 of 107
9 4. FEE PROPOSAL (separately uploaded to OpenGov) which includes:
a. A detailed breakdown of costs by task and subtask including hours, billing rates, job titles and Consultant firm name. For each task and subtask, list the staff level, number of hours, hourly rate and total cost. Include any other direct charges to be billed on the project such as mileage, reproduction, etc. b. The cost of non-labor and subconsultant services. This information will be used by City staff to evaluate the reasonableness of the fee proposal and will be used in negotiating the final fee amounts for the Professional Services Agreement. The Consultant’s Standard Hourly Billing Rates for all classifications of staff likely to be involved in the project shall be included with the fee proposal along with the mark-up rate for any non-labor expenses and subconsultants.
5. Detailed WORK SCHEDULE, which shows:
a. The time required for each task, and
b. The reasonable amount of time the Consultant will require to perform the required services. The proposed Work Schedule shall be in Gantt Chart form and include a list of tasks with begin and end dates and should be based on the proposed start date listed in this RFP. Project milestones such as deliverables should be shown, and a reasonable amount of time should be shown for City review of each submittal.
6. Any comments on the City of Vista Standard CONSULTANT AGREEMENT. Identify any concerns with the terms and conditions of the City’s Standard Consultant Agreement (Agreement), including Insurance and Indemnification provisions. If terms are acceptable, provide a statement that the Consultant will sign the City’s Agreement as presented.
7. Copies of SAMPLE WORK PRODUCTS from a previous similar project completed by the Consultant. The consultant shall submit examples or links to examples of relevant projects consisting of Plans, Specifications, and Estimates for a project similar to the ones described in this RFP.
VIII. CRITERIA FOR SELECTION
The City's consultant evaluation and selection process is based on Qualifications Based Selection (QBS) for professional services. An evaluation committee appointed by the City Engineer or his designee will review the proposals. The criteria and weight for evaluating the proposals submitted will be as follows:
1. Project Understanding: Demonstrated understanding of the project requirements, degree of creativity and innovation demonstrated with respect to the project 10/27/2026 C4 29 of 107
10 approach and scope of work, and reasonableness of the schedule for the work and how the time and funding has been allocated to specific tasks. (30 points)
2. Responsiveness to Client’s Needs: Familiarity with City, State, and federal requirements and procedures; and thoroughness and completeness of proposal in response to RFP. (20 points)
3. Firm’s Experience with Similar Projects: Technical experience of project team in performing work of a closely related nature, experience working with public agencies, record of completing work on schedule and within budget. (20 points)
4. Staff and Project Experience: Qualifications of project team staff members, key personnel’s level of involvement in performing related work, logic of project organization, and adequacy of labor commitment. (15 points)
5. Quality of Work Product: Demonstrated technical ability based on relevance and quality of sample work product(s). (15 points)
Fee Schedule (separate electronic file uploaded to OpenGov Procurement) The fee schedule of the top ranked Consultant will be opened at the conclusion of the consultant evaluation and selection process. Fees will not be used to determine the ranking of the consultants. The City may interview a short list of top ranked qualified consultants or proceed directly to negotiating the final fee schedule with the top ranked consultant. The ultimate consultant selection will be based upon both technical merit and best value to the City.
The contract award, if any, will go to the Consultant whose proposal best serves the interests of the City, as determined in its sole discretion according to the evaluation criteria described above.
IX. REQUIREMENTS FOR PROVIDING SERVICES
A Notice to Proceed for this project is tentatively scheduled to be issued in November 2026.
Upon issuance of Notice to Proceed, the Consultant shall submit a detailed schedule for the project including milestones and progress reports.
All dates are subject to change, and the City reserves the right to extend the date by which proposals are due via addendum.
The selected Consultant shall comply with all applicable federal, state, and local regulations, 10/27/2026 C4 30 of 107
11 and contract provisions. The selected consultant or consultant team shall perform the full scope of work as described in this RFP including attachments.
The selected Consultant shall carry out the instructions received from the City and shall cooperate with the City and other involved agencies.
The selected Consultant shall assume responsibility for all services offered in their proposals.
The selected Consultant will be the sole point of contact regarding contractual matters, including payment of any and all charges resulting from contracts.
Consultant is responsible for researching available records, determining their usefulness on this project, and paying any charges for copies of records.
All exhibits, studies, reports, plans, specifications, estimates, calculations, and other documents shall be prepared in accordance with the scope of work. City of Vista standards and San Diego Regional Standard Drawings shall be utilized where applicable and may be called out on the plans as a reference. Improvement plans shall adhere to City of Vista Standards and the Standard Specifications for Public Works Construction (GREENBOOK). Plans and exhibits shall be computer drafted in AutoCAD, ArcView or other compatible software and delivered to the City of Vista at project completion on electronic media in a format readable by the City, along with .pdf files for archival purposes.
The exhibits, studies, reports, plans, specifications, estimates, calculations, and other documents furnished under the Agreement shall be of a quality acceptable to the City. All work products shall be of neat appearance, well organized, technically and grammatically correct, internally consistent, thoroughly reviewed and checked, dated, designated with an accurate “percent complete” number, and having the maker and checker identified. The minimum standard of appearance, organization and content of the drawings and other work products shall be that of similar types provided by the Consultant in its Proposal as Sample Work Products and as set forth in related City of Vista standards and guidelines, or requirements.
The Consultant shall modify its work as necessary to meet the level of acceptability defined by the criteria above.
The Consultant has total responsibility for the accuracy and completeness of the studies, reports, exhibits, plans and related designs, specifications and estimates prepared and shall check all such materials accordingly. The City’s review of any reports, plans, and other work products for conformity with the requirements of the Agreement does not absolve the Consultant of their responsibility for accuracy and completeness. Reviews by the City do NOT include detailed review or checking of design or the accuracy with which such designs are depicted on the plans.
Consultant or its subconsultants shall not incorporate in the design any materials or equipment of single or sole source origin without written approval of the City. 10/27/2026 C4 31 of 107
12 All draft and completed work, including surveys, workshop documents, schematic designs, ancillary reports, calculations, correspondence, and all other work products developed as part of this project, whether in written, video, or electronic formats, shall become the property of the City at the end of the project.
PREVAILING WAGES
Pursuant to the Vista City Charter and the Vista Municipal Code, payment of prevailing wages and compliance with the California Labor Code Sections 1770 et seq is required. General prevailing rates of wages and classifications are applicable to this contract as ascertained and adopted by the State of California, Director of Industrial Relations (DIR) pursuant to California Labor Code Article 2 of Chapter 1 of Part 7 of Division 2, as amended. Certified payroll on an approved compliance format is required for all work under this Contract. Please see links below for State prevailing wage rates.
http://www.dir.ca.gov/oprl/DPreWageDetermination.htm
X. ESTABLISHMENT OF FEES
The Consultant shall be paid based upon hourly rates and unit costs for services rendered as negotiated. Sub-consultant costs shall be allocated on a per task basis but does not need to be broken out by each staff classification. The City limits mark up for sub-consultants and direct costs to 5%. This information will be used by City staff to evaluate the reasonableness of the estimated cost of services and will be used in negotiating the final fee amounts for the contract agreement. Hourly rates shall be based on work occurring in 2026 and 2027.
Proposed rates shall clearly correlate with names and classifications of staff expected to be involved with the projects.
There will be no compensation to the Consultant for hours expended due to the Consultant’s errors and omissions. There will be no fee rate adjustments during the life of the contract including no increase in hourly rates.
XI. METHOD OF PAYMENT
The method of payment to the successful proposer shall be on a time and materials basis with a maximum “not to exceed” fee per task as determined through final negotiations. This figure shall include direct costs; overhead such as, but not limited to, transportation, communications, subsistence, materials and any subcontracted items of work; and reasonable profit. Progress payments will be based on actual hours, hourly costs, support service costs and allowable direct costs charged to the project on a monthly basis. 10/27/2026 C4 32 of 107
13 The Consultant shall submit monthly invoices to the City. Each invoice shall include a detailed breakdown of the services, the tasks, the hours, the personnel, and staff type who worked on the project, and hourly rates. No more than 85 percent of the total payment amount will be made prior to the final completion and approval of all work and delivery of final products.
XII. CONSULTING AGREEMENT
A sample Standard Consulting Agreement is enclosed for review, as Attachment B. The RFP and the Consultant’s Proposal will be attached and become part of the Agreement as exhibits.
The signer of the proposal must declare in writing that the only person, persons, company or parties interested in the proposal as principals are named therein; that the proposal is made without collusion with any other person, persons, company, or parties submitting a proposal; that it is in all respects fair and in good faith without collusion or fraud; and, that the signer of the proposal has full authority to bind the principal proposer.
Please refer to the sample agreement for the necessary amounts of general liability, automotive, worker’s compensation and professional liability insurance. The appropriate endorsements are also shown within the sample contract agreement. The insurance certificate shall include the City of Vista, its officers and employees as insured or additional insured.
The contents of the Proposal of the successful Consultant, with any mutually agreed upon changes, shall become a contractual obligation if a contract ensues. Failure of a Consultant to accept this obligation will result in the cancellation of any award. Any damage accrued by the City as a result of a failure to contract may be recovered from the Consultant.
XIII. ASSIGNED REPRESENTATIVES
The City will assign a responsible representative to administer the contract, and to assist the Consultant in obtaining information. The Consultant also shall assign a responsible representative (Project Manager), who shall be identified in the proposal. The Consultant’s representative will remain in responsible charge of the Consultant’s duties from the Notice- to-Proceed through project completion. If the Consultant’s Project Manager should be unable to continue with the project, then the Consultant shall notify the City’s representative in writing. The City’s representative shall first approve any substitution of representatives or sub-consultants identified in the proposal in writing. The City reserves the right to review and approve/disapprove all key staff and sub-consultant substitution or removal and may 10/27/2026 C4 33 of 107
14 consider such changes not approved to be a breach of contract. This breach of contract will not apply if the team member leaves their respective Consulting firm.
XIV. RIGHT TO REJECT PROPOSALS
The City reserves the right to delay the project or reject any or all proposals submitted, and no representation is made hereby that any contract will be awarded pursuant to this RFP or otherwise.
The City reserves the right to extend the due date for proposals, accept or reject any or all proposals received as a result of this RFP, negotiate with any qualified consultant or cancel this RFP in part or in its entirety. The City may require the selected Consultant to participate in negotiations and to submit such technical fee, or other revisions of their proposals as may result from negotiations.
All costs incurred in the preparation of the proposal, the submission of additional information and/or any aspect of a proposal prior to award of a written contract will be borne by the Respondent. The City will provide only the staff assistance and documentation specifically referred to herein and will not be responsible for any other cost or obligation of any kind, which may be incurred by the Respondent. All proposals submitted to the City of Vista become the property of the City.
XV. DISCLOSURE
The City is a public agency subject to the disclosure requirements of the Public Records Act, California Government Code Section 6250 and following. These requirements include an exemption for “trade secrets”. If any proprietary information is contained in or attached to the written proposal, it must be clearly identified in Consultant’s proposal. In order to protect trade secrets from disclosure, pursuant to a Public Records Act request, you must agree in writing to defend and indemnify the City of Vista if litigation results.
XVI. ESTIMATED TIMELINE
The City’s schedule for the selection process is as follows:
1. City Releases RFP July 22, 2026
2. Deadline for Questions August 7, 2026, at 4:00 PM
3. Proposals Due August 19, 2026, at 4:00 PM
4. Notice of Consultant Shortlist (If Applicable) August 26, 2026 10/27/2026 C4 34 of 107
15 5. Consultant Interview (If Needed) August 31, 2026
6. Notice of Consultant Selection September 2, 2026
7. Complete Negotiation of Agreement September 15, 2026
8. Council Award October 27, 2026
9. Notice to Proceed November 2026
All dates are subject to change, and the City reserves the right to extend the date by which proposals are due.
XVII. CONCLUSION
If after reviewing the above requirements, the Consultant is interested in proposing services to the City of Vista, the Consultant should notify the City of their interest and their intent to submit a proposal. All submittals must be received by the City of Vista Engineering Department via the online procurement portal OpenGov by the date and time listed in this RFP.
The Consultant is advised that any recommendation for contract award is not binding on the City until the Agreement is fully executed and approved by the City Council or City Manager, depending on the contract amount.
Any questions shall be submitted through the OpenGov procurement portal by August 7, 2026, at 4:00 PM.
Attachment A: Guidelines for Traffic Signal Design Plans Attachment B: City of Vista Standard Professional Services Agreement
10/27/2026 C4 35 of 107
16 ATTACHMENT A
Guidelines for Traffic Signal Design Plans 2017
10/27/2026 C4 36 of 107
10/27/2026 C4 37 of 107
THIS PAGE INTENTIONALLY LEFT BLANK
10/27/2026 C4 38 of 107
GUIDELINES FOR THE PREPARATION OF TRAFFIC SIGNAL DESIGN PLANS
TABLE OF CONTENTS
I.FORWARD………………………………………………………………………………….. 1
II.STANDARDS……………………………………………………………………………….. 1
III.DESIGN PLANS…………………………………………………………………………… 2
IV.TITLE SHEET AND PLAN NOTES
CITY CIP PROJECTS DESIGN PLAN NOTES……………………………………… 3
PRIVATE DEVELOPMENT PROJECTS DESIGN PLAN NOTES……………… 3
TRAFFIC SIGNALS NOTES……………………………………………………………… 3
TRAFFIC SIGNAL INTERCONNECT NOTES………………………………………. 5
CONSTRUCTION NOTES………………………………………………………………… 7
10/27/2026 C4 39 of 107
GUIDELINES FOR THE PREPARATION OF TRAFFIC SIGNAL DESIGN PLANS
NOTE: Revisions to these guidelines shall be noted in the revision log below. The Engineer of Work should check with the Engineering Department of the City of Vista to confirm the copy in use is updated with the latest revisions.
REVISION LOG
PAGE NO.
(of
previous
guidelines)
SECTION /
SUBSECTION REVISION DATE CHANGE
ALL ALL 10/09/2007 New – Traffic Signal Manual
ALL ALL 09/12/11
Deleted: Traffic Signal Manual
New: Guidelines for the Preparation of Traffic Signal Design Plans, HYH
ALL ALL 04/04/2012 Update, HYH
Pages 7-10 Section IV 07/03/2014 Updated notes 2, 9 & 12 and added notes 24 & 25 under “Construction Notes”, HYH
Pages 4, 5, 7
& 9 Section IV 11/30/2015 Updated some general notes and construction notes, HYH Pages 4 - 10 Section IV 8/28/2017
Modified notes 2 & 3 under “Traffic Signal Notes”,
Grammar changes to notes under “Traffic Signal
Interconnect Notes”, Modified notes 1, 2, 6, 22 under “Construction Notes”.
10/27/2026 C4 40 of 107
GUIDELINES FOR THE PREPARATION OF TRAFFIC SIGNAL DESIGN PLANS
I. FORWARD
These guidelines establish uniform procedures for the design of both new and modified traffic signals in the City of Vista. It is not intended as a textbook or as a substitute for established standards, experience in the principles of traffic signal design and sound engineering judgment, but rather as a guideline to uniformity and to provide the designer with sufficient information to prepare the desired plans with a minimum of uncertainty.
II. STANDARDS
Traffic signal design and installation in the City of Vista shall conform to the following:
1. City of Vista Development Code
2. City of Vista Standard Drawings
3. The latest edition of Caltrans Standard Plans
4. The latest edition of Caltrans Standard Specifications
5. The latest edition of Caltrans Standard Special Provisions
6. The latest edition of the California Manual on Uniform Traffic Control Devices (CA MUTCD)
7. The latest edition of the Caltrans Traffic Manual (only the parts which are still in effect)
8. The latest edition of the Standard Specifications for Public Works Construction (“Green Book”), including supplements thereto
9. The latest edition of the San Diego Regional Standard Drawings
10. Project Plans and Specifications
The Engineer of Work shall:
1. Be a Civil Engineer (not a Traffic Engineer) with current California registration and shall sign and seal the final Plans.
2. Meet with the City’s Project Engineer to review design concepts and shall prepare a “redlined” concept drawing for discussion.
3. Obtain an electrical service point using the applicable process for the serving utility.
4. Prior to beginning design, send a map of the area where the improvements are proposed to all utility companies (San Diego Gas & Electric, AT&T, Cox Communications, Time Warner Cable, Vista Irrigation District, City of Vista, Cities of San Marcos and Oceanside and the County of San Diego if project is near their boundaries) so that the utility companies can provide as-builts of their utilities. Next, send to the 10/27/2026 C4 41 of 107
GUIDELINES FOR THE PREPARATION OF TRAFFIC SIGNAL DESIGN PLANS
utility companies draft design plans showing the proposed improvements along with the utilities plotted from the as-builts so that the utility companies can verify the location of their utilities and check for conflicts with the proposed improvements. If conflicts are foreseen, utility companies, at their discretion, shall pothole locations of potential conflicts prior to completion of the design plans. Final approved design plans must also be sent to the utility companies for final verification of utility locations and conflict checks and for use in utility relocation, if needed.
5. Perform an as-built and record search to depict on the Plans all existing utilities (water, sewer, storm drain, traffic signal fiber optic, other communications infrastructure, etc.) within the entire footprint of the work area.
6. Verify that all existing traffic signal equipment and any proposed traffic improvements conform to current standards. Additionally, the Engineer of Work shall verify if the existing equipment can be re-used, replaced, salvaged and/or disposed of.
7. Submit electronic CAD and PDF drawings reflecting as-built changes as submitted by the contractor using bubbles and deltas. The Engineering Department will plot the as- built, obtain signatures and file the as-builts in the City’s system. Note that the original electronic CAD file must be saved separately prior to making any as-built changes.
III. DESIGN PLANS
Plans shall be designed on City standard “D” size sheet including the title sheet. The City’s standard title sheet with all notes will be provided by the City as detailed below. The quality of drafting and lettering size shall conform to the highest standards in order to ensure legible reduced prints. Plans shall be produced in the AutoCAD version currently used by the City's Engineering Department. In addition to original signed mylars of all plan sheets, a copy of the original electronic AutoCAD file and an electronic copy of the signed plans in PDF format shall be submitted to the City on a CD.
DESIGN PLAN GUIDELINES
1. A traffic signal design plan shall contain the following elements: • Standard improvement plan title sheet with notes. The standard title sheet with all the notes will be provided by the City as detailed in Section IV below • Standard traffic signal design title sheet with Traffic Signal Notes and applicable Construction Notes. The standard title sheet with all the notes will be provided by the City as detailed in Section IV below • If applicable, standard interconnect title sheet with General Notes, Traffic Signal Interconnect Notes, applicable Construction Notes and details. The standard title sheet with all the notes and details will be provided by the City as detailed below • If applicable, standard title sheet with signage and striping notes and details. The standard title sheet with all the notes and details will be provided by the City as detailed in Section IV below • Plan view drawing showing traffic signal improvements • Conductor schedule, pole schedule, phase diagram, detector assignment and pole placement detail • Design sheets showing other improvements as necessary 10/27/2026 C4 42 of 107
GUIDELINES FOR THE PREPARATION OF TRAFFIC SIGNAL DESIGN PLANS
• Construction and post construction BMPs and erosion control design. Sample BMP details and notes are available for review and electronic dissemination by the City
2. The above design sheets can be rearranged to reduce the total number of sheets as space allows. For example, the Traffic Signal Notes may be placed on the standard improvement plan title sheet and the applicable Construction Notes may appear on the traffic signal design sheet itself. Another example is to combine the Traffic Signal Notes and the signage and striping notes and details into one sheet.
3. A traffic signal design plan shall use NEMA phasing conforming to the California Manual on Uniform Traffic Control Devices (CA MUCTD), Part 4, Highway Traffic Signals.
4. The traffic movements on the major roadway shall be designated phases 2 and 6.
Phase 2 is to be used to designate either the northbound or eastbound movement. If the two intersecting streets are apparently of equal importance, the City's Engineering Department shall designate which of the two is the major roadway.
5. North shall always be oriented up or to the right on all design plan sheets. The major roadway shall always be horizontal on the plan.
6. Signal design plans shall be drawn at a 1" = 20' scale.
7. Pole identification numbering (or lettering) shall always increase clockwise around the intersection with the lowest numbered pole being always on the corner where the controller cabinet exists or is to be located.
8. Conduit run identification numbering shall start at the farthest conduit crossover from the controller cabinet corner and always increase in clockwise direction toward the home run pull box on the controller cabinet corner. The final home run conduits shall have the highest identification numbers.
IV. TITLE SHEET AND PLAN NOTES
CITY CIP PROJECTS DESIGN PLAN NOTES
For City Capital Improvement Program (CIP) projects, obtain the needed standard title sheets (include the border, signature boxes and all pertinent notes and details) from the Engineering Department.
PRIVATE DEVELOPMENT PROJECTS DESIGN PLAN NOTES
For private development projects, obtain the needed standard title sheets (include the border, signature boxes and all pertinent notes and details) at the link below:
http://www.cityofvista.com/departments/communitydev/forms.cfm
TRAFFIC SIGNALS NOTES
The following notes appear on the traffic signal design standard title sheet. Please read these notes prior to beginning design.
10/27/2026 C4 43 of 107
GUIDELINES FOR THE PREPARATION OF TRAFFIC SIGNAL DESIGN PLANS
1. Contractor shall coordinate service details and scheduling with San Diego Gas and Electric well in advance of need.
2. Contractor shall prepare a traffic control plan and obtain the signed approval of the plan from the City Engineer or his representative for all work impacting vehicular, bicycle and pedestrian traffic and for any traffic signal shutdown. The plan is to be prepared by a California licensed construction zone traffic control contractor (C31 Contractor) or a California registered Traffic or Civil Engineer. The plan will depict all signing, striping, delineation, flagging and all other traffic control devices necessary to the operation, in the opinion of the City Engineer or his representative. Actual working hours for construction and for traffic signal shutdown will be determined by the City Engineer or his representative upon review of the traffic control plan and based on the impact to traffic. For City CIP projects, the Project Specifications provide more details regarding traffic control requirements and working hours.
3. Contractor shall notify the City of Vista Public Works Department and the City’s Traffic Engineer or his representative, through the City’s Construction Inspector, a minimum of two (2) working days before implementing any traffic signal system shutdown already authorized by an approved traffic control plan.
4. Contractor shall notify the City’s Traffic Engineer or his representative, through the City’s construction inspector, a minimum of three (3) working days prior to activation of new or modified traffic signals and shall arrange for a field meeting to perform the activation. The City’s Traffic Engineer or his representative will prepare a new or a modified timing sheet as appropriate and will provide the timing sheet to the contractor during the activation field meeting. Activations shall be accomplished within a two-hour period on weekdays between the hours of 9:00 AM and 2:00 PM upon approval from the Traffic Engineering Division.
5. Contractor shall arrange to have a signal technician, employed by the controller manufacturer or his representative and qualified to work on the controller, present at the project site for the entire duration of the activation field meeting.
6. Contractor shall maintain in operation all existing traffic signals and street lighting for the benefit of the public during the progress of the work. Existing electrical services, traffic signal equipment, traffic signs, and street lights that are being replaced or relocated shall remain in service until the replacement facilities are installed and operational or useable.
7. Conduits between adjoining pull boxes shall be 2” PVC Schedule 80 unless otherwise noted on the Plans. Conduits crossing streets shall be 3”.
8. All trenching for conduit installation must be accomplished using underground boring methods unless specifically noted on the Plans.
9. Underground signal conductors shall not be spliced.
10. All pull boxes shall be No. 5 unless otherwise noted on the Plans.
11. Pull boxes shall not be located in or within 1’ of any part of any curb ramp (sloped portions of the ramp; wings; grooves; or landings).
10/27/2026 C4 44 of 107
GUIDELINES FOR THE PREPARATION OF TRAFFIC SIGNAL DESIGN PLANS
12. All pull box and vault covers shall be marked with the words TRAFFIC SIGNAL.
13. The contractor shall verify with the City’s Inspector and Traffic Engineer the precise field locations of all traffic signal equipment prior to installation.
14. An “AS-BUILT” drawing clearly showing the actual locations of all traffic signal components and other improvements shall be submitted by the contractor and approved by the City Engineer prior to the acceptance of the improvements.
15. All equipment and parts called out on the Plans to be salvaged must be delivered to the City’s Public Works Satellite Yard located at 2430 Lupine Hills Drive. However, the contractor must first contact one of the following Public Works staff members at least two working days in advance to coordinate delivery of the salvaged equipment and parts:
Keith Gardner…….760-518-4738
JD Rubidoux……….760-644-6797
TRAFFIC SIGNAL INTERCONNECT NOTES
The following notes appear on the standard traffic signal interconnect design title sheet.
Please read these notes prior to beginning design.
1. Conduit runs are shown on the Plans in schematic form only.
2. Contractor shall verify linear feet of conduit and fiber optic cable by field inspection.
3. Distances shown on the Plans are approximate. Contractor shall carefully measure actual distances and make allowances for slack before cutting fiber optic cable.
4. All trenching for conduit installation must be accomplished using underground boring methods unless specifically noted on the Plans.
5. Conduits must be installed within three feet of the face of curb or, if no curb exists, within two feet of the edge of pavement, except as necessary to avoid conflicts.
6. If open trenching is allowed for certain segments, then trench paving must be performed in accordance with City of Vista Standard Drawing Numbers SRF-8A & 8B, Type B.
7. Fiber optic cable shall be installed in 2” PVC Schedule 80 conduit.
8. All conduit bends are to be factory made.
9. Pull boxes shall be No. 6E unless otherwise noted on the Plans, spaced no more than 500’ apart and shall not be closer than three feet to driveways.
10/27/2026 C4 45 of 107
GUIDELINES FOR THE PREPARATION OF TRAFFIC SIGNAL DESIGN PLANS
10. Pull box locations between intersections shown on the Plans are approximate and may be field located by the Contractor with the approval of the City Inspector to avoid obstructions and facilitate construction.
11. Pull boxes shall not be located in or within 1’ of any part of any curb ramp (sloped portions of the ramp; wings; grooves; or landings).
12. All pull box and vault covers shall be marked with the words SIGNAL COMMUNICATIONS.
13. It is the responsibility of the contractor to determine the exact location of all loop detectors prior to commencing work in the area. The contractor is responsible for avoiding all loop detectors during construction and shall not cut or break any loops.
Any damage to existing loop detection during construction shall be the responsibility of the contractor to replace. Boring under loop detector lead-in cable is allowed provided that a minimum 5’ distance be observed on each side of the loop, and operations do not result in pavement sag or loop damage.
14. Contractor shall replace, at contractor’s expense, any fiber optic cable in which the attenuation of any single mode strand at 1310 nm exceeds 0.4 dB/Km, excluding single point events at authorized splices and connectors.
15. When three or more fiber optic cables enter an enclosure, each fiber optic cable shall be labeled indicating the location of the far end of the fiber optic cable.
16. Deflection limits of all single mode fiber optic cable shall not exceed 20 times the outside diameter of the fiber optic cable being installed.
17. Concrete sidewalks near controller cabinets that are in conflict with proposed conduit routing and impracticable to bore or tunnel under shall be removed and replaced between expansion joints, and not saw cut through slab. Removal and replacement of concrete shall include complete slab.
18. A spandrel section of an existing cross gutter that is in conflict with proposed conduit routing and is impracticable to bore or tunnel under shall be removed and replaced between expansion joints, and not saw cut through the slab. Removal and replacement of concrete shall include complete spandrel sections from joint to joint.
19. An “AS-BUILT” drawing clearly showing the actual locations of all system components and other improvements shall be submitted by the contractor and approved by the City Engineer prior to the acceptance of the improvements.
20. All equipment and parts called out on the Plans to be salvaged must be delivered to the City’s Public Works Satellite Yard located at 2430 Lupine Hills Drive. However, the contractor must first contact one of the following Public Works staff members at least two working days in advance to coordinate delivery of the salvaged equipment and parts:
Keith Gardner…….760-518-4738
JD Rubidoux……….760-644-6797
10/27/2026 C4 46 of 107
GUIDELINES FOR THE PREPARATION OF TRAFFIC SIGNAL DESIGN PLANS
CONSTRUCTION NOTES
The following sample construction notes shall be used on traffic signal design Plans and traffic signal interconnect design Plans as applicable. Please note that these notes are general and only cover the most common installations in traffic signal and interconnect design. The notes may be modified and other notes may be added as appropriate. In addition, a note need not be shown on the plans if the item(s) is not being installed.
1. Furnish and install:
a. McCain, Inc. model 352i ATC anodized aluminum cabinet with Corbin#2 locks.
Cabinet shall be equipped with a 16-channel output assembly and a 48-channel input assembly.
b. Foundation per Caltrans Standard Plan Drawing ES-3C
c. McCain, Inc. model ATC 2070 traffic signal controller d. Latest version of McCain, Inc. Omni signal timing program e. Model 412C system memory module
f. EDI model 222 two-channel loop detectors
g. PDA2 assembly Model 242 DC Isolator units
h. Latest Tomar Optical Signal Processor
i. McCain, Inc. 24VDC Model 206 power supply
j. Model 210ECL conflict monitor
k. All necessary load switches
Alternative equal components may be used as approved by the City.
2. Furnish and install Type III-BF City approved traffic signal and lighting service (Address XXXX XXXXX) per SDG&E requirements, SDG&E Electric Underground Meter & Service Location Form available in the Project Specifications Appendix and Caltrans Standard Plan Drawing ES-2E in an anodized aluminum cabinet enclosure per Caltrans Standard Plan Drawing ES-2C. Provide a metered 100A-3 Pole, 240V main circuit breaker; a metered 50A-1 Pole 120V traffic signal circuit breaker; and a metered 30A-1 Pole, 240V lighting circuit breaker. Obtain an electrical permit from the City’s Building Department prior to beginning this work. Contact the City after completing this work for an electrical inspection and approval.
FOR PRIVATE DEVELOPMENT PROJECTS, USE THIS NOTE 2 INSTEAD:
Furnish and install Type III-BF City approved traffic signal and lighting service per SDG&E requirements, SDG&E Electric Underground Meter & Service Location Form (to be obtained by Engineer of Work or Contractor) and Caltrans Standard Plan Drawing ES-2E in an anodized aluminum cabinet enclosure per Caltrans Standard Plan Drawing ES-2C. Provide a 100A-3 Pole 240V main circuit breaker; a metered 50A-1 Pole 120V traffic signal circuit breaker; and a metered 30A-1 Pole, 240V lighting circuit breaker. Obtain an electrical permit from the City’s Building Department prior to beginning this work. Contact the City after completing this work for an electrical inspection and approval.
3. Furnish and install a three-inch (3”) DB electrical service conduit and pull rope from the SDG&E service point to the electric meter service per SDG&E requirements and as shown on the SDG&E Electrical Underground Meter & Service Location form. 10/27/2026 C4 47 of 107
GUIDELINES FOR THE PREPARATION OF TRAFFIC SIGNAL DESIGN PLANS
4. Furnish and install loops for vehicle and bicycle detection per City of Vista Standard Drawing TRF-5; Caltrans Standard Plans; Caltrans Standard Specifications; the Green Book; and the California MUTCD.
5. Furnish and install an Iteris RZ-4 AWDR (or City approved equal) camera and equipment necessary for video detection of vehicles and bicycles. Location of cameras shall be determined in the field by the City’s Traffic Engineer and Inspector. Camera locations shown on these plans are to illustrate design intent only and are subject to adjustment due to field conditions or equipment requirements. Provide the latest Iteris Vantage Edge processor card for each camera; a Vantage Edge Connect card to stream the camera images back to the TMC; Samsung LCD (or City approved equal) control display (Cyberview BNC+S-Video video input) in a lockable rack-mount drawer; computer mouse; all cables; and accessories and make all connections and programming necessary for full and proper operation of the video detection system.
6. Furnish and install a complete Alpha battery backup system including:
A. Alpha FXM 1100 inverter
B. Four Alpha cell 100 XTV batteries
C. Alpha SE48-1616 cabinet with generator option; UATS bypass switch; and an 8” riser
D. AlphaGuard battery charge management system model AG-CMT-4SC-P
7. Furnish and install the latest Tomar (or City approved equal) emergency vehicle pre- emption (EVP) detector assembly (including mounting hardware and cables) for each direction. EVP shall be mounted per detail “B” of Caltrans Standard Plan ES-4E.
8. Furnish and install a mast arm-mounted reflectorized street name sign per City of Vista Standard Drawing Numbers TRF-3A through TRF-3E.
9. Furnish and install a Polara Navigator APS series audible-tactile model number EN29VN1-Y accessible pedestrian signal system (or City approved equal), complete with push button stations (PBS) and a handheld Polara Navigator Configurator. All equipment must be ordered per the Polara EZ Communicator Navigator Order Form. All stations must be programmed with custom Voice on Location (VOL) messages per the Polara Custom Voice Message Details Form. Both forms are included in the Appendix of the Project Specifications.
FOR PRIVATE DEVELOPMENT PROJECTS, USE THIS NOTE 9 INSTEAD:
Furnish and install a Polara Navigator APS series audible-tactile model number EN29VN1-Y accessible pedestrian signal system (or City approved equal), complete with push button stations (PBS) and a handheld Polara Navigator Configurator. The Contractor is to complete the Polara EZ Communicator Navigator Order Form and have it approved by the City prior to ordering equipment. All stations must be programmed with custom voice on location (VOL) messages per the Polara Custom Voice Message Details Form. The City completes the Polara Custom Voice Message Details Form, but the Contractor must request its completion from the City at least two weeks prior to need.
10/27/2026 C4 48 of 107
GUIDELINES FOR THE PREPARATION OF TRAFFIC SIGNAL DESIGN PLANS
10. Furnish and install the latest model of GE Lumination (or City approved equal) countdown pedestrian signal indications.
11. Furnish and install the latest model of 12” GE Lumination (or City approved equal) red, yellow and green signal indications.
12. Furnish and install LED safety lighting system, catalog number STR-LWY-3M-HT-05-E- UL-SV-700-R-UTL per appendix of Project Specifications, or City approved equal.
FOR PRIVATE DEVELOPMENT PROJECTS, USE THIS NOTE 12 INSTEAD:
Furnish and install LED safety lighting system, catalog number STR-LWY-3M-HT-05-E- UL-SV-700-R-UTL, or City approved equal.
13. Furnish and install a new 44” X 32” X 36” splice vault for fiber optic cable per Detail ‘A’ on sheet XX. Contractor shall provide two (2) grounding rods, lifting rings and bolts.
Cover shall be 24” X 36” with 1” diameter pick holes. All metal surfaces shall have a galvanized finish.
14. Furnish and install a No. 6E pull box (with extension) with 45 degree bends for fiber optic cable per Detail ‘B’ on sheet XX. No.6E pull boxes shall be spaced no more than 500 feet apart.
15. Furnish and install 2” PVC Schedule 80 conduit for fiber optic cable. All conduit bends shall be factory made. Furnish and install a new No. 8 AWG solid bare ground wire and a pull rope or tape inside the conduit.
16. Furnish and install a new trunk Corning Altos, all-dielectric, fully water-blocked, loose tube, gel-free, 12-strand single mode fiber optic (SMFO) cable (or City approved equal).
Contractor shall coil 20 feet of trunk 12- strand SMFO cable slack in every pull box or vault per Detail ‘C’ on sheet XX unless noted otherwise on the Plans. All fiber optic cable, including branch cables, shall be installed in its own conduit separate from electrical conductors.
17. Furnish and install a new branch Corning Altos, all-dielectric, fully water-blocked, loose tube, gel-free, 12-strand single mode fiber optic (SMFO) cable (or City approved equal).
18. Furnish and install a new splice enclosure per Detail ‘D’ on sheet XX. Splice enclosure shall be the latest Corning model or City approved equal. It shall have a minimum 48- fiber splice capability; provide cable ports as required; have a moisture-tight sealing arrangement; and have re-entry capability.
19. Perform necessary splicing of the 12-strand trunk fiber cable with the 6-strand fiber cable per Detail ‘E’ on sheet XX. All remaining unused fiber strands in the trunk cable must remain intact and if cut, must be rejoined by splicing.
20. Furnish and install a Vilink Model VK 230 (or City approved equal) fiber optic modem to be installed in the traffic signal controller cabinet per Detail ‘F’ on sheet XX. Provide all cables; connectors; and auxiliary equipment necessary to establish communication.
10/27/2026 C4 49 of 107
GUIDELINES FOR THE PREPARATION OF TRAFFIC SIGNAL DESIGN PLANS
21. Contractor shall provide and install all necessary equipment at the traffic signal and at the Civic Center to establish full communications between the traffic signal and the Civic Center. This includes, but is not limited to, connectors; fiber optic pig tails; splice closures; splice enclosures; splice trays; connector panels; patch panels; cords; etc.
22. Furnish and install a Bosch Ruggedized HD (MIC-7230-W5) remote-control camera to be mounted on traffic signal pole. The camera installation is to include all other necessary modems, cabling and programming to make the camera operational:
a. MIC-DCA-HWA: MIC hinged DCA, white; includes stainless steel conduit adapter (male M25 to female ¾-inch NPT)
b. MIC-PMB: Pole mount bracket
c. MIC-WMB-WD: MIC550/MIC612 Wall mount bracket white
d. NPD-6001A: Midspan, single port, 60W, AC in
Installation shall include all trenching; conduit; cabling; ancillary equipment; and splicing between the nearest splice vault or pull box; the traffic signal controller cabinet; and the new camera.
23. Contractor shall adjust conduit, pull boxes and cabinet locations to clear existing utility facilities except with regards to minimum conduit depth.
24. Furnish and install sign as noted on plans on traffic signal mast arm per Caltrans Standard Plan ES-7N Detail “U”.
25. Furnish and install sign as noted on plans on signal pole using saddle bracket per Caltrans Standard Plan RS4.
10/27/2026 C4 50 of 107
17 ATTACHMENT B
City of Vista Standard Professional Services Agreement
10/27/2026 C4 51 of 107
Professional Services (Non-Construction) (RFP)(NPW) 1 of 9 NAMEX [51960-2] 00051960 4
CONTRACT FOR PROFESSIONAL SERVICES
TYPE OF SERVICES
THIS “CONTRACT” is entered into by and between the “Parties” as of ___________________ (“Contract Date”).
1.0 THE “PARTIES”
The “City”:
CITY OF VISTA, a chartered municipal
corporation
200 Civic Center Drive
Vista, CA 92084
Working Contact: workingname
Billing Contact: billingname
The “Contractor”
NAMEX, statusx
Address1
Address2
Contact: contactname
2.0 BASIC TERMS
2.1 The “Services” to be performed by Contractor are set forth in the Request for Proposals attached as Exhibit A.
2.2 The “Required License” for the Services is: type.
2.3 Contractor, an entity holding the Required License, desires to enter into this “Contract” with City for the Services.
2.4 The “Project” for which the Services are required is described in Exhibit A.
2.5 Contractor has submitted to City a Proposal to perform the Services dated proposaldate (“Exhibit B”).
2.6 The “Contract Ceiling Price” is: pricex
2.7 Any references in Exhibit A or Exhibit B to “Consultant” shall mean Contractor for the purposes of this Contract.
3.0 CONTRACT TERM
3.1 This Contract shall take effect as of the Contract Date.
3.2 This Contract shall be in effect for xx calendar months (“Term”) from the Contract Date. The Term may be extended at the City’s option for an additional yy months, in increments of City’s choice, for a maximum Term of zz months from the Contract Date.
3.3 City may terminate this Contract upon 30-days’ written notice to Contractor. In such event, or upon request of City, Contractor shall assemble all City documents in the Contractor's possession, put them in order for proper filing and closing, and deliver the documents to City. In the event of termination, Contractor shall be paid for work performed to the termination date. City shall make the final determination as to the portion of tasks completed and the compensation to be paid.
10/27/2026 C4 52 of 107
Professional Services (Non-Construction) (RFP)(NPW) 2 of 9 NAMEX [51960-2] 00051960 4
4.0 SCOPE
Contractor shall perform all Services including, but not limited to, the furnishing of all tools, equipment, materials, software, and supplies, and for furnishing all transportation, services, including fuel, power and water, essential communications, and the performance of all labor, work, or other operations, as may be required from time to time, in accordance with Exhibit A and Exhibit B. In the event of a conflict between the provisions of Exhibit A and Exhibit B, the provisions of Exhibit A shall control.
5.0 COMPENSATION
5.1 City shall pay Contractor for the Services to be performed as set forth in Exhibit B.
5.2 An invoice for payment shall be submitted in a form satisfactory to City. At a minimum, the invoice shall include: the purchase order number, the work order number, a description of the work performed, and a total amount.
5.3 Changes in, additions to, or deductions from the Services, including increases or decreases in any item or portion of the Services, shall be set forth in a written change order executed by City and by the Contractor which shall specify:
5.3.1 The changes, additions, and deductions to be made.
5.3.2 The increase or decrease in compensation due the Contractor, if any.
5.3.3 Adjustment in the time of completion, if any.
5.4 Contract Ceiling Price
5.4.1 In no event shall City be liable for paying more than the Contract Ceiling Price for Contractor's services rendered under this contract.
5.4.2 If it becomes foreseeable that Contractor will need to perform services such that the cumulative total of costs to City will exceed the maximum permitted by this Contract, any such cost overrun will be handled pursuant to the change order procedure in Vista Municipal Code Chapter 3.08. City and Contractor recognize that City lacks authority to exceed the cost ceiling without the express authorization of the City Council. If the maximum cost to City for this Contract is exceeded unexpectedly, payment shall be made as mutually agreeable and disputes shall be handled pursuant to this Contract, but work shall cease as soon as is reasonably feasible once the cost ceiling plus allowable change orders, if any, is exceeded.
5.5 Except as provided in Exhibit B, Contractor shall not be reimbursed for any expenses incurred in rendering services under this Contract. 10/27/2026 C4 53 of 107
Professional Services (Non-Construction) (RFP)(NPW) 3 of 9 NAMEX [51960-2] 00051960 4
6.0 CONTRACT DOCUMENTS
The Contract comprises the following documents including all additions, deletions, modifications, and appendices and all addenda setting forth any modifications or interpretations of any these documents: Documents required under Exhibits A–E.
7.0 TIME FOR COMPLETION AND COMMENCEMENT OF SERVICES
All Services under the Contract must be completed in compliance with the schedule in Exhibit A.
8.0 STANDARD OF PERFORMANCE
8.1 Contractor represents and warrants that it has the training, qualifications, experience, and facilities necessary to properly perform the Services required under this Contract in a thorough, competent, and professional manner. At all times Contractor shall faithfully, competently and to the best of its ability, experience, and talent, perform all services described herein. In meeting its obligations under this Contract, Contractor shall employ, at a minimum, generally accepted standards and practices utilized by persons engaged in providing services similar to those required of Contractor under this Contract.
8.2 Contractor shall keep itself informed of and comply with all applicable federal, state, and local laws, statutes, codes, ordinances, regulations, and rules in effect during the Term of this Contract. Contractor shall obtain any and all licenses, permits and authorizations necessary to perform the services set forth in this Contract, including any business licenses required by City. Neither City, nor any elected or appointed boards, officers, officials, employees, or agents of City, shall be liable, at law or in equity, as a result of any failure of Contractor to comply with this Section.
9.0 CONTRACTOR’S STATUS; CONTRACTOR’S EMPLOYEES
9.1 Contractor shall perform the services provided for herein in Contractor's own way as an independent contractor and in pursuit of Contractor's independent calling. Contractor is not to be considered an employee of City, nor shall any employees of Contractor be considered employees of City, for any purpose. Contractor shall be under the direction and control of City staff only as to the results to be accomplished. This Contract is not intended to create the relationship of partnership, joint venture, or association between City and Contractor.
9.2 Contractor represents and warrants that all professional services required under this Contract shall be provided by a person or persons duly licensed by the State of California to provide those types of services.
9.3 Neither Contractor, nor any of Contractor's officers, employees, or agents, shall obtain any rights to retirement, health care or any other benefits which may otherwise accrue to City’s employees. Contractor expressly waives any claim Contractor may have to any such rights.
9.4 Contractor is aware of the requirements of the Immigration Reform and Control Act of 1986 and shall comply with those requirements, including, but not limited to, verifying the eligibility for employment of all of Contractor’s officers, employees, agents, and subcontractors that are included in this Contract.
10/27/2026 C4 54 of 107
Professional Services (Non-Construction) (RFP)(NPW) 4 of 9 NAMEX [51960-2] 00051960 4
9.5 The payment made to Contractor pursuant to this Contract shall be the full and complete compensation to which Contractor and Contractor’s officers, employees, agents, and subcontractors are entitled for performance of any work under this contract. Neither Contractor nor Contractor’s officers or employees are entitled to any salary or wages, or retirement, health, leave or other fringe benefits applicable to employees of the City. City will not make any federal or state tax withholdings on behalf of Contractor. City shall not be required to pay any workers' compensation insurance on behalf of Contractor.
9.6 Contractor agrees to defend and indemnify City for any obligation, claim, suit, or demand for tax, retirement contribution including any contribution to the Public Employees Retirement System (PERS), social security, salary or wages, overtime payment, or workers' compensation payment which City may be required to make on behalf of Contractor or any employee of Contractor, or any employee of Contractor construed to be an employee of City, for work done under this contract. This is a continuing obligation that survives the termination of this Contract.
10.0 CIVIL RIGHTS
10.1 Contractor agrees to comply with Title VII of the Civil Rights Act of 1964, as amended, the California Fair Employment Practices Act, the Americans with Disabilities Act of 1990, any other applicable federal and state laws and regulations hereinafter enacted.
10.2 Contractor shall not knowingly deny an opportunity or benefit, discriminate against or harass, any employee or applicant for employment on account of the person’s race, color, ethnicity, national origin, ancestry, religion, creed, veteran status, physical disability, mental disability, medical condition, marital status, sex, sexual orientation, age, or other status protected from workplace discrimination by state or federal law.
10.3 Contractor shall not knowingly give preferential treatment to any applicant for employment on the basis of race, color, ethnicity, national origin, ancestry, religion, creed, physical disability, mental disability, medical condition, marital status, sex, or sexual orientation.
10.4 This section shall be interpreted in a manner that is consistent with the California and United States Constitutions and applicable state and federal statutes governing workplace discrimination. The terms used in this section shall have the same meaning as defined in state statutes governing the same subject matter.
10.5 Nothing in this section shall be interpreted as prohibiting bona fide occupational qualifications consistent with applicable state and federal law and reasonably necessary to the normal operation of Contractor. Nothing in this section shall be interpreted as prohibiting regulations and policies to prevent nepotism or conflicts of interest.
10.6 Nothing in this Section shall be interpreted as prohibiting action taken to establish or maintain eligibility for any federal program, where ineligibility would result in a loss of federal funds to City.
10.7 To the fullest extent permitted by law and without limitation by the other provisions of this Contract relating to indemnification and insurance, Contractor shall also indemnify, defend, and hold harmless City, and its directors, officers, employees, and agents from and against all liability (including without limitation all claims, damages, penalties, fines, and judgments, associated investigation and administrative expenses, and defense costs, 10/27/2026 C4 55 of 107
Professional Services (Non-Construction) (RFP)(NPW) 5 of 9 NAMEX [51960-2] 00051960 4
including but not limited to reasonable attorneys' fees, court costs, and costs of alternative dispute resolution) resulting from any claim of discrimination or harassment, including but not limited to sexual harassment, arising from the conduct of the Contractor or any of the Contractor’s officers, employees, agents, licensees, or subcontractors. In the event of a discrimination or harassment complaint against any employee, agent, licensee, or subcontractors of Contractor or its subcontractors, Contractor shall take immediate and appropriate action in response to such complaint, including, but not limited to termination or appropriate discipline of any responsible employee, agent, licensee, or subcontractors. The provisions of this Section survive completion of the services or termination of the Contract.
11.0 CONTROL OF SERVICES
Each Party shall appoint a representative who shall have the authority to represent and act for that Party (“Representative”). Any written or verbal directions or requests of City's Representative delivered to the Contractor’s Representative shall have the same force and effect as if delivered to the Contractor. The Contractor's Representative shall have the authority to sign any change order, coordinate the work of all subcontractors and make other decisions pertaining to the Contract.
12.0 ASSIGNMENT AND SUBCONSULTING
12.1 Neither this Contract nor any interest herein may be transferred, assigned, conveyed, hypothecated, or encumbered voluntarily or by operation of law, whether for the benefit of creditors or otherwise, without the prior written approval of the City. Transfers restricted hereunder shall include the transfer to any person or group of persons acting in concert of more than twenty-five (25%) of the present ownership and/or control of Contractor, taking all transfers into account on a cumulative basis. In the event of any such unapproved transfer, including any bankruptcy proceeding, this Contract shall be void. No approved transfer shall release the Contractor or any surety of Contractor of any liability hereunder without the express consent of City.
12.2 Contractor shall be fully responsible to the City for any acts and omissions of Contractor's subcontractor, including persons either directly or indirectly employed by subcontractor, in the event Contractor subcontracts any of the work to be performed under this contract. Contractor's responsibility under this paragraph shall be identical to Contractor's liability for acts and omissions of Contractor and employees of the Contractor. Nothing contained in this Contract shall create any contractual relationship between City and any subcontractor of Contractor, but Contractor shall bind every subcontractor and every subcontractor of a subcontractor by the terms of this contract applicable to Contractor's work, unless such change, omission, or addition is approved in advance in writing by the City Manager or the City Manager’s designee. All subcontractors are subject to the prior written review and approval of the City Manager or the City Manager’s designee.
13.0 LICENSES
If a license of any kind, which term is intended to include evidence of registration, is required of Contractor, its employees, agents, or subcontractors by federal, state, or local law, Contractor warrants that such license has been obtained, is valid and in good standing, and that any required bond has been posted in accordance with all applicable laws and regulations. 10/27/2026 C4 56 of 107
Professional Services (Non-Construction) (RFP)(NPW) 6 of 9 NAMEX [51960-2] 00051960 4
14.0 FINANCIAL RECORDS
14.1 Contractor shall maintain any and all documents, ledgers, books of account, invoices, vouchers, canceled checks, or records demonstrating or relating to Contractor’s performance of services pursuant to this Contract or evidencing or relating to expenditures and disbursements charged to City pursuant to this Contract. Any and all such documents or records shall be maintained in accordance with generally accepted accounting principles and shall be sufficiently complete and detailed so as to permit an accurate evaluation of the services provided by Contractor pursuant to this Contract. Any and all such documents or records shall be maintained for three years from the date of execution of this Contract and to the extent required by laws relating to audits of public agencies and their expenditures. It is expressly understood and agreed that the provisions of this Section will survive termination of this Contract.
14.2 Any and all records or documents required to be maintained pursuant to this Section shall be made available for inspection, audit and copying, at any time during regular business hours, upon request by City or its designated representative. Copies of such documents or records shall be provided directly to the City for inspection, audit and copying when it is practical to do so; otherwise, unless an alternative is mutually agreed upon, such documents and records shall be made available at Contractor's address indicated for receipt of notices in this Contract or the primary location from which services are rendered, whichever is closer.
15.0 OWNERSHIP OF DOCUMENTS
Upon delivery, the work product, including without limitation, all original reports, writings, recordings, drawings, files, and detailed calculations developed under this contract are the property of City. Contractor agrees that all copyrights which arise from creation of the work pursuant to this contract shall be vested in City and waives and relinquishes all claims to copyright or other intellectual property rights in favor of City. City acknowledges that its use of the work product is limited to the purposes contemplated by the scope of Services and that Contractor makes no representation of the suitability of the work product for use in or application to circumstances not contemplated by the scope of Services.
16.0 CONFIDENTIALITY
16.1 Contractor shall treat all information obtained from City in the performance of this Contract as confidential and proprietary to City. Contractor shall treat all records and work product prepared or maintained by Contractor in the performance of this Contract as confidential.
16.2 Contractor agrees that it will not use any information obtained as a consequence of the performance of work for any purpose other than fulfillment of Contractor’s scope of Services. Contractor will not disclose any information prepared for City, or obtained from City or obtained as a consequence of the performance of work to any person other than City, or its own employees, agents or subcontractors who have a need for the information for the performance of Services under this Contract unless such disclosure is specifically authorized in writing by City.
16.3 Contractor’s obligations under this paragraph shall survive the termination of this Contract.
10/27/2026 C4 57 of 107
Professional Services (Non-Construction) (RFP)(NPW) 7 of 9 NAMEX [51960-2] 00051960 4
17.0 CONFLICT OF INTEREST REQUIREMENT
Contractor agrees that, to the extent applicable, it shall comply with and be bound by all laws and regulations deriving from the relationship of the Contractor to the City, including the Political Reform Act (Government Codes Section 87100 et seq.) Chapters 2.32 or 2.33 of the Vista Municipal Code, the Community Redevelopment Act (Health & Safety Code 33000 et seq.) and all regulations promulgated thereunder (collectively “Conflict Laws”). As a condition precedent to the formation of this Contract, Contractor warrants and covenants that it is adequately informed regarding the obligations and duties imposed by the Conflict Laws and that to the best of Contractor's knowledge and belief, there exists no conflict of interest (under the laws) that would disqualify the Contractor from participation in any decisions arising out of the performance of this Contract. Prior to commencement of any work in the performance of this Contract, Contractor shall comply with any applicable requirements of Chapter 2.32 of the Vista Municipal Code, including any requirement to file a financial disclosure statement with the City Clerk.
Contractor further agrees that no employee, agent or subcontractor for Contractor shall perform any work for the City pursuant to this Contract which will violate the Conflict Laws.
18.0 PROHIBITION OF FINANCIAL INTEREST BY CITY OFFICIAL Contractor warrants and covenants to City that no City Official has or will have any current or future financial interest in this Contract as of the date approved, nor shall Contractor promise, offer, or enter into any written, oral or implied Contract, to provide any financial interest or remuneration of any kind or manner to any City official with respect to this Contract. For purposes of this Section, the term “City Official” shall mean and include any elected or appointed officer of City, any employee of City, or any spouse or financial dependent of a City official or employee. A violation of this provision shall render this Contract null and void and Contractor shall be subject to restitution of all fees or money paid or earned under this Contract.
19.0 INDEMNIFICATION
Other than in the performance of Design Professional services, which shall be solely addressed as in Section 19.1 below, to the fullest extent permitted by law, Contractor shall defend, indemnify and hold City and its officers, officials, employees, and volunteers harmless against any and all liability, loss, damage, fine, penalty, expense, claim or cost (including without limitation costs and fees of litigation) of every nature (collectively, “Liability”) arising out of or in connection with Contractor’s performance under this Contract, including defects in design, except: (1) Liability caused by City's sole negligence or willful misconduct; or (2) for Liability caused by City's active negligence, in which case the indemnity received by City shall be reduced by the amount: (i) that City's active negligence contributed to the Liability on a comparative basis; or (ii) such other amount as may be required by law (“Duty of Indemnification”).
19.1 To the fullest extent permitted by law (including, without limitation, California Civil Code Section 2782.8), with respect to the performance of Design Professional services, Contractor shall indemnify and hold harmless the City and its officers, officials, employees and volunteers harmless against all claims, demands or liability that arise out of, pertain to, or relate to the negligence, recklessness, or willful misconduct of Contractor in the performance of Design Professional services under this Contract. In relation to Design Professional services, in no event shall the cost to defend charged to Contractor exceed the Contractor’s proportionate percentage of fault.
10/27/2026 C4 58 of 107
Professional Services (Non-Construction) (RFP)(NPW) 8 of 9 NAMEX [51960-2] 00051960 4
19.2 The review, acceptance or approval of Contractor’s work or work product by any indemnified party shall not affect, relieve, or reduce Contractor’s indemnification or defense obligations. This Section survives completion of the services or the termination of this contract.
The provisions of this Section are not limited by and do not affect the provisions of this contract relating to insurance.
20.0 INSURANCE AND BONDS
Contractor shall comply with the insurance provisions set forth in Exhibit C.
21.0 SERVICE OF NOTICE
21.1 Any notice, which either Party may desire to give to the other Party, must be in writing and may be given by personal delivery to the Party’s Representative or by overnight courier service to the Party’s address set forth in Section 1.0. Notice may also be given by mailing it by registered or certified mail, return receipt requested, to the other Party at the address set forth in Section 1.0. Any notice given by mail will be deemed given 48 hours after such notice is deposited in the United States mail, addressed as provided with postage fully prepaid.
21.2 A Party may change its address by giving notice as provided above, and the changed address shall thereafter be deemed to be the address set forth in Section 1.0.
22.0 SPECIAL PROVISIONS
This Contract is subject to, and Contractor shall comply with, the special provisions referenced in Exhibit E, if any.
23.0 EXHIBITS
All documents referenced as exhibits in this Contract, or referenced in an exhibit to this Contract, are incorporated herein.
24.0 APPLICABLE LAW, VENUE
This Contract shall be construed and enforced under the laws of the State of California. If any action is commenced by any Party to this Contract, such action shall be filed in a court of competent jurisdiction within the County of San Diego, California.
25.0 COUNTERPARTS; ELECTRONIC SIGNATURES; ELECTRONIC DELIVERY This Agreement may be executed in separate counterparts, none of which need contain the signatures of both Parties, and each of which, when so executed, shall be deemed an original and all together shall constitute and be one of the same instrument. The Parties agree that this Agreement, whether executed by electronic signature, digital signature, or constituting a scanned or electronically reproduced copy or image of this Agreement bearing the signatures of the Parties, will be deemed an original and will represent competent evidence of the execution, terms and existence of this Agreement notwithstanding the failure or inability to produce an original executed Agreement or counterpart thereof, and without the requirement that the unavailability of such original executed Agreement or counterpart thereof first be proven.
Further, the exchange of this entire executed Agreement (and/or such exhibit(s) or document(s)) that is in photostatic or portable document format (.pdf) form by electronic mail or by another electronic means shall be considered original(s) and shall constitute effective execution and delivery of the original(s).
10/27/2026 C4 59 of 107
Professional Services (Non-Construction) (RFP)(NPW) 9 of 9 NAMEX [51960-2] 00051960 4
26.0 MODIFICATIONS
This Contract contains the entire agreement, between the Parties and supersedes all prior negotiations, discussions, obligations, and rights of the Parties in respect of each other regarding the subject matter of this Contract. There is no other written or oral understanding between the Parties. No modification, amendment or alteration of this Contract shall be valid unless it is in writing and signed by all Parties.
[Continued on page 9.]
27.0 EXECUTION
IN WITNESS WHEREOF; the Parties hereto have executed this Contract as of the Contract Date.
“City”
CITY OF VISTA, a chartered municipal
corporation
By:
JOHN CONLEY, CITY MANAGER
JOHN B. FRANKLIN, MAYOR
ATTEST:
KATHY VALDEZ, CITY CLERK
By:
APPROVED AS TO FORM:
WALTER CHUNG, CITY ATTORNEY
By:
RISK MANAGEMENT REVIEW:
ANALISA HOLBROOK, RISK MANAGER
By:
“Contractor”
NAMEX, statusx
By:
Name/Title
By:
Name/Title
10/27/2026 C4 60 of 107
00051960 4 Exhibit A
EXHIBIT A
REQUEST FOR PROPOSALS
10/27/2026 C4 61 of 107
00051960 4 Exhibit B
EXHIBIT B
CONTRACTOR’S PROPOSAL
10/27/2026 C4 62 of 107
00051960 4 Exhibit C, Page 1 of 3
EXHIBIT C
INSURANCE REQUIREMENTS
Contractor shall procure and maintain for the duration of the contract, insurance against claims for injuries to persons or damages to property which may arise from or in connection with the performance of the work hereunder by the Contractor, his agents, representatives, employees, or subcontractors. Nothing in these provisions shall limit Contractor’s Duty of Indemnification.
MINIMUM SCOPE AND LIMIT OF INSURANCE
Coverage shall be at least as broad as:
1. Commercial General Liability (“CGL”): Insurance Services Office Form CG 00 01 covering CGL on an “occurrence” basis, including products, completed operations, property damage, bodily injury, and personal & advertising injury with limits no less than $2,000,000 per occurrence. If a general aggregate limit applies, either the general aggregate limit shall apply separately to this Project/location or the general aggregate limit shall be twice the required occurrence limit.
2. Automobile Liability: Insurance Services Office Form Number CA 0001 covering Code 1 (any auto), with limits no less than $2,000,000 per accident for bodily injury and property damage.
3. Workers’ Compensation insurance as required by the State of California, with Statutory Limits, and Employers’ Liability insurance with a limit of no less than $1,000,000 per accident for bodily injury or disease.
Contractor shall also provide the additional coverages checked below and at least as broad as:
4. Professional Liability, with limits no less than $1,000,000 per occurrence or claim, and $2,000,000 policy aggregate.
If the Contractor maintains higher limits than the minimums shown above, City requires and shall be entitled to coverage for the higher limits maintained by the Contractor. Any available insurance proceeds in excess of the specified minimum limits of insurance and coverage shall be available to City.
Deductibles and Self-Insured Retentions
Any deductibles or self-insured retentions must be declared to and approved by City. At the option of City, either: the Contractor shall cause the insurer shall reduce or eliminate such deductibles or self-insured retentions as respects City, its officers, officials, employees, and volunteers; or the Contractor shall provide a financial guarantee satisfactory to City guaranteeing payment of losses and related investigations, claim administration, and defense expenses.
Other Insurance Provisions
The insurance policies are to contain, or be endorsed to contain, the following provisions:
1. The City, its officers, officials, employees, and volunteers are to be covered as additional insureds on the CGL policy with respect to liability arising out of with respect 10/27/2026 C4 63 of 107
00051960 4 Exhibit C, Page 2 of 3
to liability arising out of work or operations performed by or on behalf of the Contractor including materials, parts, or equipment furnished in connection with such work or operations and automobiles owned, leased, hired, or borrowed by or on behalf of the Contractor. General liability coverage can be provided in the form of an endorsement to the Contractor’s insurance (at least as broad as ISO Form CG 20 10, CG 11 85 or both CG 20 10 and CG 20 37 forms if later revisions used), unless otherwise approved in advance by City.
2. For any claims related to this Project, the Contractor’s insurance coverage shall be primary insurance as respects City, its officers, officials, employees, and volunteers.
Any insurance or self-insurance maintained by City, its officers, officials, employees, and volunteers shall be excess of the Contractor’s insurance and shall not contribute with it.
3. Each insurance policy required by this clause shall provide that coverage shall not be canceled, except with notice to City.
Claims Made Policies
If any coverage required is written on a claims-made coverage form:
1. The retroactive date must be shown, and this date must be before the execution date of the contract or the beginning of contract work.
2. Insurance must be maintained and evidence of insurance must be provided for at least five (5) years after completion of contract work.
3. If coverage is canceled or non-renewed, and not replaced with another claims-made policy form with a retroactive date prior to the contract effective, or start of work date, the Contractor must purchase extended reporting period coverage for a minimum of five (5) years after completion of contract work.
4. A copy of the claims reporting requirements must be submitted to City for review.
Acceptability of Insurers
Insurance is to be placed with insurers with a current A.M. Best rating of no less than A: VII, unless otherwise acceptable to City.
Waiver of Subrogation
Contractor hereby agrees to waive rights of subrogation which any insurer of Contractor may acquire from Contractor by virtue of the payment of any loss. Contractor agrees to obtain any endorsement that may be necessary to affect this waiver of subrogation. The Workers’ Compensation policy shall be endorsed with a waiver of subrogation in favor of City for all work performed by the Contractor, its employees, agents and subcontractors.
Verification of Coverage
Contractor shall furnish City with original certificates and amendatory endorsements, or copies of the applicable insurance language, effecting coverage required by this contract. All certificates and endorsements are to be received and approved by City before work commences. However, failure to obtain the required documents prior to the work beginning shall not waive the Contractor’s obligation to provide them. City reserves the right to require 10/27/2026 C4 64 of 107
00051960 4 Exhibit C, Page 3 of 3
complete, certified copies of all required insurance policies, including endorsements, required by these specifications, at any time.
Subcontractors
Contractor shall require and verify that all subcontractors maintain insurance meeting all the requirements stated herein, and Contractor shall ensure that City is an additional insured on insurance required from subcontractors. For CGL coverage, subcontractors shall provide coverage with a format least as broad as CG 20 38 04 13.
Special Risks or Circumstances
City reserves the right to modify these requirements, including limits, based on the nature of the risk, prior experience, insurer, coverage, or other circumstances.
10/27/2026 C4 65 of 107
00051960 4 Exhibit D
AGREEMENT TO COMPLY WITH CALIFORNIA LABOR LAW REQUIREMENTS [Labor Code §§ 1720, 1771.1, 1773.8, 1775, 1776, 1777.5, 1813, 1860, 1861, 3700]
NOT APPLICABLE TO THIS CONTRACT
10/27/2026 C4 66 of 107
00051960 4 Exhibit E
EXHIBIT E
SPECIAL PROVISIONS
This Contract is subject to the following provisions, if checked:
1. State of California grant conditions, as attached.
2. Federal grant conditions, as attached.
3. Other conditions, as attached.
10/27/2026 C4 67 of 107
00051960 4 Exhibit B
EXHIBIT B
CONTRACTOR’S PROPOSAL
10/27/2026 C4 68 of 107
619 878 8069 [email protected] 531 Encinitas Boulevard, Suite 202, Encinitas, CA 92024 In Partnership with
PROPOSAL FOR:
TRAFFIC SIGNAL DESIGN FOR
CIP NO. 8407: N. SANTA FE AVENUE & ANGELES VISTA DRIVE
TRAFFIC SIGNAL
CIP NO. 8408: S. SANTA FE AVENUE & SANTA ANITA DRIVE
TRAFFIC SIGNAL
GTS.260713
10/27/2026 C4 69 of 107
8407: N. SANTA FE AVENUE & ANGELES VISTA DRIVE TRAFFIC SIGNAL 8408: S. SANTA FE AVENUE & SANTA ANITA DRIVE TRAFFIC SIGNAL City of Vista
Engineering Department
200 Civic Center Drive
Vista, CA 92084
Subject: Traffic Signal Design for CIP No. 8407 – N. Santa Fe Avenue/Angeles Vista Drive and CIP No. 8408 – S. Santa Fe Avenue/Santa Anita Drive
Dear City of Vista Selection Committee:
On behalf of GTS, I am pleased to submit our proposal for the City of Vista’s CIP 8407 – N. Santa Fe Avenue/Angeles Vista Drive and CIP 8408 – S. Santa Fe Avenue/Santa Anita Drive Traffic Signal Projects.
While the primary improvements are two new traffic signals, our field review confirms that successful delivery will depend largely on resolving the interfaces between signal pole placement, overhead and underground utilities, ADA improvements, access, drainage, and existing right-of-way conditions before they become late-stage design conflicts. At Santa Anita Drive, the opposing commercial driveway and Santa Fe Place access modification require careful integration of circulation, pedestrian, and signal improvements. At Angeles Vista Drive, overhead utilities, guy wires, roadway grades, parking, and incomplete pedestrian facilities constrain both signal and ADA design.
We have assembled our team specifically around those challenges. Aida Edgington, PE, TE, will serve as Project Manager and the City’s day-to-day point of contact. Aida brings more than 23 years of experience and has previously worked with RICK Engineering in Vista on the Taylor Terrace project. I will serve as Principal-in-Charge, providing senior technical oversight and independent quality review based on more than 25 years of traffic engineering experience.
RICK Engineering will provide civil engineering and surveying and brings established experience working with the City of Vista and familiarity with its standards and processes. AirX will provide targeted potholing to confirm critical utility conflicts, while GeoCon will provide the geotechnical investigation and foundation recommendations for the proposed signal poles. Together, GTS and our subconsultants provide the complete traffic, civil, survey, utility, and geotechnical capabilities required to move both projects from field verification through construction-ready PS&E and construction support.
Our approach is straightforward: resolve the constraints before advancing the design. Vista has already established a strong framework for doing so through its Guidelines for the Preparation of Traffic Signal Design Plans. We will build on the City’s established concept- review and utility-coordination procedures, supplemented by early survey, utility research, ADA/civil coordination, and geotechnical verification, so that the 60% design reflects a vetted and constructible solution rather than a preliminary layout that still carries unresolved field risks.
GTS brings extensive recent experience delivering new and modified traffic signals, signing and striping, safety lighting, fiber-optic interconnect, CCTV, detection, ADA improvements, signal timing, PS&E, and construction support for Southern California public agencies.
More importantly, the team proposed here combines specialized traffic signal expertise, prior Vista experience, an established traffic/civil working relationship, and firsthand knowledge of the project sites.
We appreciate the opportunity to support the City of Vista and are committed to providing the senior-level attention and practical, constructible design necessary to successfully deliver both projects.
Sincerely,
COVER LETTER
Rawad Hani, PE, TE | Principal / QA/QC Manager
General Technologies and Solutions (GTS), Inc
531 Encinitas Boulevard, Suite 202, Encinitas, CA 92024 | 619 878 8069 | [email protected] 10/27/2026 C4 70 of 107
8407: N. SANTA FE AVENUE & ANGELES VISTA DRIVE TRAFFIC SIGNAL 8408: S. SANTA FE AVENUE & SANTA ANITA DRIVE TRAFFIC SIGNAL 3 T A
B
L
E
O
F
C
O
N
T
E
N
T
S
Cover Letter --
Statement of Qualifications 1
Financial Responsibility of the Firm 1
Organization Chart 2
Key Personnel 2
Resumes of Key Staff --
Relevant Project Experience 3
Work Plan 5
Work Schedule --
Consultant Agreement Comments --
Sample Work Products --
10/27/2026 C4 71 of 107
8407: N. SANTA FE AVENUE & ANGELES VISTA DRIVE TRAFFIC SIGNAL 8408: S. SANTA FE AVENUE & SANTA ANITA DRIVE TRAFFIC SIGNAL 1 General Technologies and Solutions, Inc. (GTS) is an Encinitas-headquartered traffic engineering and transportation planning firm specializing in the planning, design, and implementation of safe and constructible transportation improvements for public agencies. Traffic signal design and roadway safety are core GTS services, and our team supports projects from preliminary engineering and operational analysis through PS&E, agency and utility coordination, bidding, and construction support.
The City of Vista’s CIPs 8407 and 8408 align directly with this expertise. GTS has delivered new traffic signals and signal modifications, safety lighting, fiber-optic interconnect and communications, CCTV, vehicle and bicycle detection, signal timing, ADA and pedestrian improvements, signing and striping, utility coordination, cost estimates, specifications, and construction support for public agencies throughout Southern California. Our experience includes work for the Cities of San Diego, Glendora, La Habra Heights, Mission Viejo, Carson, Santa Monica, Calabasas, Wildomar, and others.
Our experience has taught us that successful signal projects are rarely constrained by the signal design alone. Pole and foundation placement must work with utilities; ADA geometry must work with grades and right-of-way; conduit and interconnect must work with existing infrastructure; and civil, electrical, and traffic improvements must ultimately come together in one coordinated and constructible set of documents. GTS routinely manages these interfaces and focuses on resolving them during concept development rather than carrying unresolved conflicts into the 60%, 90%, and Final PS&E stages.
For Vista, we have intentionally assembled a multidisciplinary team around those interfaces. GTS will lead overall project management and the traffic signal, electrical, ITS/fiber, CCTV, detection, signing and striping, signal timing, PS&E, and construction-support elements.
RICK Engineering will provide surveying and civil engineering, including ADA/roadway improvements, drainage, stormwater/water-quality design, erosion control, and construction support, as applicable. AirX Utility Surveyors will provide targeted utility locating and potholing, and GeoCon will provide geotechnical engineering and, as applicable, construction materials testing. Together, the team provides the capabilities needed to take both intersections from field verification through construction-ready documents.
The team also brings an important Vista-specific advantage. RICK has extensive prior experience working for the City and familiarity with its standards and procedures, while GTS Project Manager Aida Edgington, PE, TE, has previously worked with RICK on projects in Vista.
This existing working relationship provides established coordination between the traffic and civil disciplines from the outset. GeoCon also brings extensive local geotechnical experience and has recently been selected by the City for on-call geotechnical engineering, special inspections, and materials testing services.
GTS understands that Vista has established detailed Guidelines for the Preparation of Traffic Signal Design Plans and a defined process for concept development, utility coordination, equipment selection, interconnect, plan preparation, and construction documentation.
Our team will build upon the City’s established framework and apply our experience to identify conflicts early, minimize unnecessary relocations and redesign, and deliver accurate, coordinated, and implementation-ready PS&E packages.
STATEMENT OF QUALIFICATIONS
FINANCIAL RESPONSIBILITY OF THE FIRM
GTS is a financially stable and responsible firm with the resources necessary to successfully perform the services required under this contract. GTS maintains appropriate insurance coverage, meets its ongoing financial obligations, and has sufficient staffing and operational capacity to undertake and complete the proposed work. The firm is not currently subject to any bankruptcy proceedings or other financial conditions that would impair its ability to perform the requested services.
GTS has successfully managed multiple concurrent public-agency contracts and maintains the financial and organizational capacity necessary to provide responsive services throughout the duration of the contract. 10/27/2026 C4 72 of 107
8407: N. SANTA FE AVENUE & ANGELES VISTA DRIVE TRAFFIC SIGNAL 8408: S. SANTA FE AVENUE & SANTA ANITA DRIVE TRAFFIC SIGNAL 2
ORGANIZATION CHART
Team Member Commitment* Qualifications / Role
Aida Edgington,
PE, TE – Project
Manager
23+ years of municipal traffic engineering. City point of contact; leads coordination, schedule, budget, interdisciplinary integration, and technical delivery. Prior Vista work with RICK.
Rawad Hani,
PE, TE, RSP1 –
Principal/ QA/QC
25+ years in transportation engineering. Provides executive oversight, key technical decisions, and independent QA/QC at major milestones.
Chaouki A. Hosn,
EE – Electrical Lead
34+ years of electrical infrastructure design. Leads signal power, safety lighting, electrical service, and SDG&E coordination.
Cassandra Garcia
EIT – Senior Design
Engineer
Leads traffic signal, signing/striping, quantities, conduit layout, and PS&E production through Final Design
Carson Edgington,
PE – Civil Principal
Provides senior civil oversight, constructability review, and coordination of ADA, roadway, drainage, and stormwater design.
Alejandra Quesada,
EIT – Civil Design
Manager
Leads day-to-day civil design including ADA, grading, drainage, stormwater, and erosion control.
Geff Dye,
PLS – Topographic
Surveying Lead
40+ years of survey experience. Oversees topographic, ROW, utility, and overhead-wire survey supporting final design
AirX Leads targeted utility locating and potholing at critical pole, conduit, ADA, and civil Matt Love,
GE – Principal
Engineer
Leads signal-pole foundation geotechnical investigation and develops soil parameters and lateral, torsional, and axial foundation recommendations.
City of Vista
PROJECT MANAGER
GTS
Senior-led team with dedicated day-to-day design staff and established GTS–RICK coordination in Vista.
RICK AIRX GEOCON
Aida Edgington
PE, TE
PROJECT MANAGER
TRAFFIC ENGINEERING
Aida Edgington, PE, TE
PROJECT MANAGER
Rawad Hani, PE, TE
QA/QC
Chaouki A. Hosn, EE
ELECTRICAL DESIGN
Cassandra Garcia, EIT
SR. DESIGN ENGINEER
April Krawiec, EIT
DESIGN ENGINEER
Rudy Garcia, EIT
FIELD SUPPORT
CIVIL ENGINEERING
Carson Edgington, PE
CIVIL LEAD
Alejandra Quesada, EIT
CIVIL DESIGN MANAGER
Amin Bandegi, MS
CIVIL DESIGN
UTILITY POTHOLING
AirX
GEOTECHNICAL ENGINEERING
Matt Love, GE
PRINCIPAL ENGINEER
Rupert Adams, CEG
SENIOR GEOLOGISTSURVEY + MAPPING
Geff Dye, PLSTOPOGRAPHIC SURVEY LEAD
Melissa Peace, PLSRIGHT-OF-WAY AND EASEMENT
Rawad Hani
PE, TE
PRINCIPAL-IN-CHARGE
SUPPORT STAFF
* % (Anticipated Project Hours ÷ Available Work Hours During the Project Period of 29 weeks or 1160 hours) / % (Availability During the Project Duration) 10% (60%)
4% (40%)
3% (40%)
17% (70%)
4% (50%)
14% (60%)
3% (40%)
- (100%)
- (100%)
10/27/2026 C4 73 of 107
RESUMES OF KEY STAFF
10/27/2026 C4 74 of 107
AIDA EDGINGTON PE, TE
PROJECT MANAGER
EDUCATION
• Bachelor of Science
Agricultural Engineering
University of Wisconsin-
Madison
REGISTRATIONS/
CERTIFICATIONS
• Professional Engineer, Civil
CA
• Traffic Engineer in CA
AREAS OF EXPERTISE
• Traffic Engineering
• Traffic Safety Analysis
• Transportation Planning
• Traffic Operations Analysis
“23+ Years Experience | CA Civil
+ Traffic Engineer | Prior City
of Vista Experience | Previous
GTS/RICK Teaming Experience |
Signal + ADA + Multidisciplinary
PS&E”
PROFILE
Aida is a California-registered Civil and Traffic Engineer with more than 23 years of experience delivering municipal transportation and public infrastructure projects from concept development through final design and construction. Her experience includes traffic signal design and modifications, signing and striping, traffic control, ADA and pedestrian improvements, utility coordination, roadway improvements, and multidisciplinary PS&E delivery.
As a Project Manager, Aida has led multidisciplinary teams; managed scope, schedule, budget, and quality; coordinated with public agencies, utilities, consultants, and contractors; and provided technical oversight throughout design and construction. Her background combines traffic engineering expertise with a strong understanding of civil, roadway, drainage, utility, and constructability considerations which are particularly important for traffic signal projects in constrained existing environments.
Aida has prior project experience in the City of Vista and has previously worked with RICK Engineering, providing an established working relationship between the traffic and civil disciplines proposed for this assignment. She brings extensive knowledge of City and regional public works practices, Caltrans standards, the California MUTCD, ADA requirements, and applicable San Diego guidance.
EXPERIENCE
• Taylor Terrace Public Improvements – City of Vista. Project Engineer responsible for traffic control and signing and striping plans supporting public improvements for a 51-unit residential development. Improvements included roadway widening, ADA-compliant pedestrian facilities, utility and drainage upgrades, and traffic engineering enhancements along Old Taylor Street and East Vista Way. Aida coordinated closely with the civil design team, RICK Engineering, and developed construction phasing to maintain safe vehicular and pedestrian access during construction.
• Ashwood Street Corridor Improvements – County of San Diego. Project Manager/Lead Traffic Engineer for a multidisciplinary corridor improvement project involving new and modified traffic signals, traffic control, and coordination with roadway, pedestrian, drainage, parking, and utility improvements. Led integration of the traffic signal design with the broader civil improvements and coordinated project delivery across disciplines.
• As-Needed Traffic Engineering Services – City of Murrieta. Consulting Traffic Engineer responsible for reviewing traffic signal plans, signing and striping plans, development plans, traffic studies, and public improvement plans for conformance with City standards. This role provides Aida with direct experience evaluating consultant work products from the public-agency perspective. • Alvarado Creek/Grantville Apartments – City of San Diego. Lead Traffic Engineer for traffic signal modification plans, signing and striping plans, traffic control plans, and supporting traffic and VMT analyses.
• Murrieta Pedestrian Safety Enhancement – City of Murrieta. Lead Traffic Engineer for preparation of construction documents, exhibits, quantity takeoffs, and ADA-compliant pedestrian improvements at 13 locations throughout the City.
• Murrieta Lighted Crosswalk Improvements – City of Murrieta. Project Manager for an HSIP-funded pedestrian safety project involving in-pavement lighted crosswalk systems and ADA curb ramp improvements at five locations near four schools.
• Design-Build Bikeways – City of San Diego. Traffic Engineer responsible for signing and striping design plans for five City bikeway corridors, including Kearny Villa Road, W. Bernardo Road, 54th Street, Balboa Avenue, and Ruffin Road.
• Mapleview Street Green Streets Improvements – County of San Diego. Project Manager/Lead Traffic Engineer responsible for signing and striping plans, traffic control plans, final design coordination, and bid cost estimates for corridor improvements along Mapleview Street. 10/27/2026 C4 75 of 107
RAWAD HANI PE, TE
PRINCIPAL / QA/QC
EDUCATION
• MS Civil Engineering,
American University
• BE Civil Engineering,
American University
REGISTRATIONS/
CERTIFICATIONS
• Civil Engineer in CA, WA, and
FL
• Traffic Engineer in CA
• PTOE - Professional Traffic
Operations Engineer
• PTP - Professional
Transportation Planner
• RSP1 - Road Safety
Professional 1
AREAS OF EXPERTISE
• Traffic Engineering
• Traffic Safety Analysis
• Transportation Planning
• Transportation Technology
Applications
“25+ Years | CA Civil + Traffic
Engineer | RSP1 | New &
Modified Signals | Safety
+ Operations | Fiber/ITS |
Independent QA/QC”
PROFILE
Rawad is a California-registered Civil and Traffic Engineer and certified Road Safety Professional with more than 25 years of experience delivering traffic signal, roadway safety, and multimodal improvement projects for public agencies throughout Southern California. His experience includes new and modified traffic signals, signal phasing and operations, safety lighting, fiber-optic communications, vehicle and bicycle detection, ADA and pedestrian improvements, signing and striping, utility coordination, and preparation of construction-ready PS&E.
As Principal-in-Charge and QA/QC Lead, Rawad will provide senior technical oversight at key project milestones, advise the team on signal layout, safety, operations, utility and constructability issues, and perform independent quality reviews of the concept, 60%, 90%, and Final design packages.
His combination of traffic signal design and roadway safety expertise allows him to evaluate not only whether a design meets standards, but whether it provides a safe, practical, and constructible solution for all roadway users.
EXPERIENCE
• City of San Diego – Balboa Avenue Improvements. Managed the preparation of traffic signal modifications, signing and striping, and traffic control plans, including signal pole relocations and detection loop replacement.
• City of San Bernardino – Traffic Signal Upgrade PS&E. Managed signal upgrade plans for 40 intersections, including controller, cabinet, pedestrian, and detection improvements. • City of Carson – Figueroa Street/Victoria Street Traffic Signal. Managed signal design, protected left-turn phasing, ADA improvements, signing and striping, and utility coordination. • City of San Juan Capistrano – San Juan Creek Road/La Novia Avenue. Provided senior oversight for traffic signal modification, pedestrian, signing and striping, and phasing improvements. • City of Rancho Palos Verdes – Hawthorne Boulevard/Eddinghill Drive. Led the warrant, operations, safety, and traffic signal design to provide protected left turn improvements. • City of Glendora – Traffic Signal Timing and Design On-Call. Provided signal design, timing, synchronization, signing and striping, and PS&E support for Route 66. • City of West Hollywood – Melrose Fiber and Smart City Design. Led the design of signal modifications, fiber communications, conduit, pull boxes, and system connections. • City of Santa Monica – Bergamot Station Connection. Led signal modifications, signing and striping, lighting, traffic control, and Caltrans coordination. • City of Perris – Ramona Expressway/Brennan Avenue. Managed the preparation of traffic signal, signing and striping, and pedestrian improvement plans. • City of Santa Paula – Harvard Boulevard/Peck Road/Main Street. Led traffic signal, lighting, signing and striping, and ADA improvements at a five-leg intersection. • City of Burbank – Signing, Striping, and Loop Replacement. Directed restoration plans for resurfacing projects and replacement of detection loops. • City of Mission Viejo / OCFA – Fire Station 24 Emergency Hybrid Beacon. Led the complete emergency hybrid beacon design, including controller equipment, signal standards, mast arms, detection, conduit, pull boxes, power service, phasing, and coordination with signing and striping. • City of Glendora – HSIP Cycle 11 Intersection Improvements. Led grant and design support for approximately $1.7 million in signal hardware upgrades, new traffic signals, pedestrian improvements, and other safety enhancements at 8 intersections. 10/27/2026 C4 76 of 107
CHAOUKI A. HOSN EE
ELECTRICAL SERVICE / SAFETY LIGHTING LEAD
EDUCATION
• BS Electrical Engineering,
University of Washington,
Seattle
REGISTRATIONS/
CERTIFICATIONS
• Electrical Engineer in CA
AREAS OF EXPERTISE
• Street Lighting
• Power and Lighting
• Layout Design
• EV Charging Stations
• Lighting Photometric
• Dry Utility Services
• Design Management
“34+ Years | CA Electrical
Engineer | Roadway & Safety
Lighting | Electrical Service
| Utility Coordination | Load
Calculations | PS&E”
PROFILE
Chaouki is a California-registered Electrical Engineer with more than 34 years of experience designing electrical infrastructure for public works and transportation projects. His expertise includes roadway and safety lighting, electrical service design, load calculations, conduit and wiring systems, dry-utility coordination, communications infrastructure, and preparation of technical specifications and construction cost estimates.
Chaouki has extensive experience coordinating electrical improvements with utility providers, civil improvements, roadway constraints, and existing overhead and underground infrastructure. His public-sector background, including substantial experience supporting the City of Los Angeles Harbor Department, gives him firsthand understanding of agency design, review, construction, and maintenance considerations. For this assignment, Chaouki will lead the electrical service and safety-lighting elements and coordinate electrical requirements with the traffic signal, civil, and utility designs.
EXPERIENCE
• SR74 (Central Ave) and Ardenwood Street Lighting, Lake Elsinore. Chaouki served as the electrical engineer of Record for street lighting design services. He managed the photometric and electrical system designs, drafted specifications and estimates, and provided comprehensive construction support.
• Lincoln and Arlington Street Lighting and Undergrounding, Torrance - Project Manager. Chaouki oversaw utility pole relocations and the undergrounding of overhead lines, ensuring seamless infrastructure transitions. He also managed the design of new traffic signal services and performed the necessary load calculations to support the updated electrical systems. • Santa Monica 20th Street Connection, Santa Monica - Electrical Design Manager. Chaouki laid out the pedestrian and bicycle lighting and designed the complete infrastructure, including new services. He prepared the technical specifications and cost estimates while working closely with Caltrans to ensure compliance within their right of way. • Palm Ave Street Lighting Design, Upland - Electrical Design Manager. Chaouki led the street lighting improvements along Palm Avenue, between West 9th Street and Alpine Street. He designed the pole layouts, conduits, wiring, and communication systems in compliance with ANSI/ IES RP-8-14 roadway lighting standards. His work also encompassed lighting photometrics, load calculations, and the preparation of detailed specifications and cost estimates. • Navy Way Street Lighting, Port of Los Angeles - Design Engineer. Chaouki designed the lighting and undergrounding for the 3-mile roadway, managing the photometrics, utility coordination, and pole layouts. He performed load calculations and prepared specifications and estimates for the project, which later transitioned to LED.
• Melrose Complete Street Design, West Hollywood - Electrical Engineer. Chaoukidesigned street light (including decorative and pedestrian lighting) as well as on-street EV charging, including power and communication infrastructure and new SCE services. He worked extensively with the City and service providers and advised on smart pole designs. • Various Dry utility services, SCE rule 20B, parking lot lighting, and complete electrical infrastructure for various development projects across Southern California. 10/27/2026 C4 77 of 107
CASSANDRA GARCIA EIT
SENIOR DESIGN ENGINEER
EDUCATION
• BS Civil Engineering,
California State Polytechnic
University, Pomona
REGISTRATIONS/
CERTIFICATIONS
• Passed NCEES PE
Exam; California Seismic &
Surveying Exams Pending
AREAS OF EXPERTISE
• Traffic Control
• Field Collection
• Traffic Signals
• Signing and Striping
• Bike Lane Design
• Field Assessment
• Client Coordination
• HSIP Projects
• Bilingual
“Traffic Signal Design Lead |
Signal Layout & Equipment |
Signing & Striping | Detection
| Field Verification | PS&E
Production”
PROFILE
Cassandra is a traffic engineering design professional with extensive experience preparing traffic signal, signing and striping, traffic control, detection, and multimodal improvement plans for public agencies throughout Southern California. Her recent work includes new and modified traffic signals, signal pole and equipment layouts, vehicle and pedestrian detection, signing and striping, traffic control, utility base mapping, and plan production for roadway, resurfacing, bicycle, pedestrian, and safety improvement projects.
For this assignment, Cassandra will serve as the Traffic Signal Design Lead, supporting development of the preliminary signal layouts and leading day-to-day preparation and coordination of the 60%, 90%, and Final traffic signal and signing and striping plans. She brings hands-on experience field- verifying existing conditions and translating survey, utility, ADA, civil, and operational requirements into coordinated construction documents.
EXPERIENCE
• City of San Diego – Balboa Avenue Improvements. Prepared traffic signal, signing and striping, and traffic control plans associated with roadway improvements, including signal pole relocations and replacement of vehicle detection loops. Coordinated signal modifications with roadway and construction improvements.
• City of Carson – Dominguez Channel Traffic Signals. Performed field verification and prepared traffic signal plans involving new signal poles, HAWK beacon designs, and associated signing and striping. Supported coordination of the signal layout with existing roadway, pedestrian, and utility constraints.
• City of San Bernardino – Traffic Signal Hardware Upgrade. Prepared traffic signal improvement plans for the replacement and upgrade of signal equipment at multiple intersections, including vehicle signal heads, pedestrian signal heads, pedestrian push buttons, and detection-related improvements.
• City of La Habra Heights – Hacienda Road Traffic Signal Improvements. Prepared signing and striping plans along Hacienda Road within the City and prepared the traffic signal design plans at Avocado Crest and associated intersection improvements. • City of Rosemead – Pedestrian Hybrid Beacon. Prepared design plans for implementation of a HAWK pedestrian crossing near a school and public park, including traffic signal equipment and related pedestrian, signing, and striping improvements. • City of West Hollywood – Melrose Complete Street. Performed field verification and developed existing-condition base mapping and traffic signal design plans for multiple signalized intersections as part of a multidisciplinary complete-street improvement project. • City of Burbank – Road Resurfacing Project, Phases I & II. Prepared signing and striping and traffic signal loop-replacement plans for multiple roadway corridors scheduled for resurfacing, coordinating detection restoration with final pavement markings and roadway improvements. • City of Rancho Palos Verdes – Traffic Engineering On-Call. Supported a variety of traffic signal, signing and striping, RRFB, and roadway-safety improvement assignments, including field reviews, collision diagrams, concept development, and construction-plan preparation. • City of San Diego – Ruffin Road Improvements. Prepared signing and striping and traffic control plans supporting roadway, curb, bus pad, driveway, and utility improvements, coordinating traffic design elements with the broader civil improvements.
• City of Glendora – Local Road Safety Plan. Supported collision-data analysis, stakeholder-input collection, and development of potential safety countermeasures for incorporation into the LRSP and subsequent HSIP funding applications.
• City of Colton – Engineering and Traffic Survey. Assisted with field data collection and preparation of supporting documentation for the City’s speed survey. 10/27/2026 C4 78 of 107
CARSON EDGINGTON PE
CIVIL ENGINEERING LEAD
EDUCATION
• BS, General Engineering,
Idaho State University
REGISTRATIONS/
CERTIFICATIONS
• Professional Civil Engineer in
CA, No. 76519
• PROFESSIONAL
AFFILIATIONS
• American Public Works
Association (APWA)
• Society of American Military
Engineers (SAME)
“30+ Years | CA Civil Engineer
| Prior City of Vista Experience
| New Traffic Signals | ADA
/ Civil | Drainage & Utilities |
Constructability”
PROFILE
Carson Edgington, PE, Principal, will serve as the Senior Civil Engineering Lead for the City of Vista Traffic Signal Designs project. Carson brings over 30 years of experience delivering transportation and public infrastructure projects throughout Southern California, including intersection improvements, ADA accessibility upgrades, traffic signal installations, roadway rehabilitation, utility relocations, drainage enhancements, and complete streets improvements.
As a Principal and Engineer of Work, he has guided projects from preliminary engineering through final design and construction, coordinating closely with local agencies, utility providers, and stakeholder groups. His experience developing cost- effective, constructable solutions within active transportation corridors provides the City of Vista with a proven resource for delivering safe, accessible, and operationally efficient intersection improvements.
EXPERIENCE
• Taylor Terrace Public Improvements, TriPointeHomes, Vista, CA: Carson served as Engineer of Work for the public improvements associated with a 51-unit residential development, overseeing design implementation and construction support for roadway widening, intersection modifications, ADA-compliant curb ramps, utility relocations, drainage improvements, signing and striping, and multi-stage traffic control along Old Taylor Street and East Vista Way. Coordinated with City of Vista staff, utility agencies, contractors, and project stakeholders to support ongoing construction, maintain public safety and access, and deliver infrastructure improvements that enhance mobility, accessibility, and long-term transportation operations. • County of San Diego, Plans for Construction of Various Pedestrian Ramps 21/22, North, East and South, San Diego, CA: Served as Engineer of Work to develop plans, specifications, and estimates to replace existing nonstandard curb ramps as well as new construction of curb ramps throughout various communities in San Diego County. Curb ramps were designed in compliance per the current standards of the ADA in support of the County of San Diego Department of Public Works. The project involved the preparation of site layout plans and construction support of the 200 curb ramps. The curb ramp locations varied from main artillery public roads, residential neighborhoods, and rural locations. Site plans included the reconstruction of the curb ramps, adjacent road resurfacing, and preserving the original diverse existing surrounding conditions. • City of Menifee, Sun City Boulevard & Murrieta Road Traffic Signal Improvements, Menifee, CA:
Carson served as Engineer of Work for the design and construction of a new traffic signal and associated intersection improvements at Sun City Boulevard and Murrieta Road. Project elements included ADA-compliant curb ramps, cross gutters, pavement reconstruction, and roadway surface improvements to enhance pedestrian accessibility, safety, and traffic operations. Improvements were designed to improve surface drainage by capturing and conveying roadway runoff through new cross gutter installations and replacement of deteriorated pavement sections while aligning roadway grades with new curb and accessibility improvements. Coordinated with utility agencies to address overhead power constraints and accommodate new signal infrastructure within an existing developed corridor, supporting the successful completion of a project that improved intersection safety, accessibility, drainage performance, and overall transportation operations. 10/27/2026 C4 79 of 107
ALEJANDRA QUESADA EIT
CIVIL DESIGN MANAGER
EDUCATION
• BS, Civil Engineering, Northern
Arizona University
REGISTRATIONS/
CERTIFICATIONS
• Engineer in Training (EIT) CA
No. 163270
• PROFESSIONAL
AFFILIATIONS
• Society of Hispanic
Professional Engineers
(SHPE)
• Building Industry Association
(BIA, BIA YGEN)
• Society of Women Engineers
(SWE)
“Civil Design Manager | 11+
Years | City of Vista Experience
| ADA / Grading / Drainage |
Stormwater | Utilities | PS&E”
PROFILE
Alejandra Quesada is a Principal Project Manager at RICK’s San Diego office. She has over 11 years of design experience in land development, public water quality, and ADA improvement plans.
Work includes grading, drainage, water quality, surface improvements, sub-surface utilities, and Green Street infrastructure. Alejandra has extensive experience in preparing ADA compliant public improvement plans, grading plans, drainage and alignment studies, final engineering documents, cost estimates, and construction administration. She is skilled in AutoCAD Civil 3D and Microstation.
Alejandra has worked closely with local agencies throughout San Diego County, including the City of Vista, to process plans. Alejandra was recently featured in Extraordinary Engineers, Volume 3, a collection celebrating the journeys, challenges, and achievements of women in engineering. A passionate advocate for STEM education and diversity, she is actively involved in student outreach, with a focus on supporting underrepresented communities.
EXPERIENCE
• Taylor Terrace Public Improvements, TriPointeHomes, Vista, CA: Alejandra served as the Principal Project Manager for the public improvements associated with a 51-unit residential development, overseeing design implementation and construction support for roadway widening, intersection modifications, ADA-compliant curb details for curb returns and ramps at two intersections and provided ADA-compliant pedestrian access along the frontage of the site, utility relocations, drainage improvements, signing and striping, and multi-stage traffic control along Old Taylor Street and East Vista Way. Coordinated extensively with City of Vista staff, utility agencies, contractors, and project stakeholders to support ongoing construction and permitting processes. • County of San Diego, Plans for Construction of Various Pedestrian Ramps 21/22, North, East and South, San Diego, CA: Alejandra served as Assistant Project Manager for the evaluation, design, and construction support of ADA-compliant pedestrian ramp improvements at locations throughout San Diego County. RICK provided engineering design, surveying, and mapping support for the County of San Diego’s ADA curb ramp improvement program, including topographic and boundary surveys, site layout plans for approximately 200 curb ramp locations, and construction support for countywide pedestrian accessibility improvements. Alejandra assisted in the preparation and delivery of site layout plans for approximately 200 curb ramp improvements supporting the County’s annual roadway resurfacing program, and provided construction-phase services including field coordination, response to RFIs, attendance at field meetings, and preparation of plan revisions to address field conditions and maintain project delivery objectives. • County of San Diego, Casa de Oro Revitalization Specific Plan – Campo Road Improvements, Spring Valley CA: As Principal Project Manager for the Casa de Oro Revitalization Specific Plan – Campo Road Improvements project, Alejandra oversaw the final design and PS&E delivery for approximately 0.55 miles of corridor improvements in Spring Valley, California.
She managed project scope, budget, schedule, and multidisciplinary coordination for roadway design, roundabouts, drainage improvements, stormwater quality, utility coordination, traffic engineering, landscape architecture, and construction documentation. Alejandra guided the team through complex design challenges, including roadway reconfiguration, drainage system modernization, and integration of green street improvements, while ensuring coordination with agency stakeholders and adherence to project goals. The project resulted in a construction-ready package supporting enhanced pedestrian safety, multimodal mobility, and long-term community revitalization.
10/27/2026 C4 80 of 107
GEFF DYE PLS
TOPOGRAPHIC SURVEY LEAD
REGISTRATIONS/
CERTIFICATIONS
• Professional Land Surveyor
CA No. 8150
“Survey/Mapping Lead |
39 Years | Design-Level
Topography | ROW &
Easements | Utility Mapping |
Intersection Surveys”
PROFILE
Geff Dye is an Associate Principal in RICK Engineering’s Survey/Mapping Department with 39 years of experience providing surveying and mapping services for public infrastructure and transportation projects throughout Southern California. His expertise includes design-level topographic surveys, right-of-way and easement mapping, boundary surveys, utility-system mapping, monument preservation, GPS control, legal descriptions, aerial mapping control, and construction staking for roadways, utilities, intersections, and other public improvements.
For this assignment, Geff will serve as the Survey/Mapping Lead, overseeing field crews and development of the horizontal and vertical design survey needed to support the traffic signal and civil improvements. His team will document existing roadway and intersection features, curb and sidewalk geometry, drainage facilities, right-of-way, utilities, and other physical constraints affecting signal pole, ADA, and civil design.
EXPERIENCE
• City of Carlsbad, Carlsbad Boulevard Pedestrian Crossing Improvements, Carlsbad, CA:
Geff served as the Field Supervisor for the office and field work on the design surveys of six intersections. This project included adding control points at each intersection, perform design surveys to create a base file with all planimetrics and a surface. Monumentation within the work limits was located and provided in the deliverable for monument preservation. • City of San Diego, On-Call ADA Pedestrian Ramps Contract, San Diego, CA: Geff served as the Project Supervisor and coordinated and supervised field and mapping work in support of the 18 different ADA ramp locations. The work included map research, dry labs, and right of way mapping. The field work included tying into local control network, design surveys, and boundary searches. The ramps were located all over the County of San Diego. This work started late 2021 and was completed in spring of 2022.
• County of San Diego, On-Call Mapping Contract, San Diego County, CA: With our current On- Call with the County of San Diego, Geff negotiated the contract and pay structure with the County Administrator as the Contract Administrator and Project Manager. Once the on-call was initiated, he supported the survey team with the requested task orders that have included easement writing, plats and legals, and right of way mapping. We are supporting the County by providing a Survey Analyst in-house at the County two days a week.
• Bake Parkway and Irvine Blvd/Trabuco Road Intersection Improvement Field Surveys, Lake Forest, CA: Through RICK’s Street and Traffic On-Call contract with the City of Lake Forest, the RICK survey department provided Aerial Topography, Supplemental detailed field topography surveys, and right-of-way and easement base mapping for the redesign and studies of these intersections and roads.
• El Toro Road and Portola Parkway Intersection Improvements, Lake Forest, CA: Through RICK’s Street and Traffic On-Call contract with the City of Lake Forest, RICK’s Survey department provided Surveying and Mapping to create right-of-way exhibits, topography using Aerial Photogrammetry, and supplemental design level field topography. The supplemental topography used 3-person survey crews due to the large amount of traffic on these streets to ensure safety to the crew members.
10/27/2026 C4 81 of 107
MATT LOVE GE
PRINCIPAL ENGINEER
PROFILE
Mr. Love has more than 14 years of geotechnical engineering experience supporting transportation, utility, and municipal infrastructure projects throughout Southern and Northern California. His experience includes subsurface investigations, field exploration and sampling, engineering analyses, geotechnical report preparation, foundation and earthwork recommendations, utility improvements, and construction-phase technical support.
As Geotechnical Lead for this assignment, Mr. Love will oversee the field investigation and engineering evaluation of subsurface conditions at the proposed traffic signal pole locations and develop the geotechnical design parameters and foundation recommendations required for final design. He has managed geotechnical assignments from preliminary investigation through final reporting and construction support and routinely coordinates with public agency staff, civil and transportation engineers, field personnel, and laboratory operations to provide practical, timely recommendations that can be readily incorporated into design.
EXPERIENCE
• City of Vista – East Vista Way Raised Medians, CIP No. 8268, Vista, CA. Mr. Love led the team that provided geotechnical engineering services for the City of Vista’s East Vista Way Raised Medians project, a roadway safety improvement project. During design, GeoCon performed pavement coring, evaluated existing pavement and subgrade conditions, and developed geotechnical recommendations supporting median construction and drainage improvements.
During construction, GeoCon also provided field observation and materials testing. The assignment provides GeoCon with direct familiarity with the City of Vista’s geotechnical review, documentation, and project-delivery expectations.
• City of La Mesa – On-Call Geotechnical Services, La Mesa, CA. Mr. Love serves as Project Manager for geotechnical services supporting roadway rehabilitation and municipal capital improvement projects under the City’s on-call contract. His responsibilities include coordinating subsurface investigations, evaluating pavement and subgrade conditions, performing engineering analyses, preparing geotechnical reports and recommendations, and coordinating directly with City staff and field personnel.
• Via De La Valle Road Widening – San Diego, CA. Mr. Love supported the geotechnical investigation for widening approximately one mile of Via De La Valle west of El Camino Real. Services included drilling, sampling, subsurface exploration, and engineering analyses to characterize existing soil conditions and support roadway and infrastructure design. Mr. Love participated in the field investigation and development of geotechnical recommendations based on observed subsurface conditions and laboratory results.
• San Dieguito Road Improvements – San Diego, CA. GeoCon performed a geotechnical investigation supporting roadway and utility improvements along San Dieguito Road. The investigation included evaluation of surface and subsurface soil conditions, review of available geologic information, engineering analyses, and preparation of geotechnical recommendations for excavation, temporary shoring, backfill and compaction, imported fill, and utility-related improvements.
EDUCATION
• BS/Civil Engineering, 2011,
Cal Poly, San Luis Obispo
REGISTRATIONS/
CERTIFICATIONS
• CA: Geotechnical Engineer,
No. 3238
• CA: Professional Engineer,
No. 84154
“Civil Design Manager | 11+
Years | City of Vista Experience
| ADA / Grading / Drainage |
Stormwater | Utilities | PS&E”
10/27/2026 C4 82 of 107
8407: N. SANTA FE AVENUE & ANGELES VISTA DRIVE TRAFFIC SIGNAL 8408: S. SANTA FE AVENUE & SANTA ANITA DRIVE TRAFFIC SIGNAL 3
RELEVANT PROJECT EXPERIENCE
Hacienda Road and Avocado Crest Road New Traffic Signal and Safety Improvements, City of La Habra Heights (2022 – 2025)
GTS provided traffic engineering design services for a new traffic signal at the T-intersection of Hacienda Road and Avocado Crest Road. The HSIP-funded improvements included a new cabinet and controller, mast arms, battery backup, interconnect capability, video detection, signing and striping, and signal timing. GTS also prepared signing and striping improvements along Hacienda Road within the City limits.
GTS served as the prime and was responsible for PS&E,
construction support services, agency and utility coordination, and funding administration. Construction took place in 2024 and 2025; The bid cost was $946,000 and the final construction cost $1,019,000 as the City added signs and pavement marking upgrades along Hacienda Road.
Client Reference: Rafferty Wooldridge, City Manager, 562-694- 6302, [email protected]
Balboa Avenue and Ruffin Road Traffic Signal and Roadway Improvements, City of San Diego (2025 – 2026)
GTS prepared traffic signal modification, signing and striping, and traffic control plans for improvements along Balboa Avenue and Ruffin Road in the City of San Diego. Our work included relocating existing signal equipment, installing new signal poles, replacing vehicle-detection loops, and updating pavement markings and signage. Traffic control plans addressed driveway construction, curb and median modifications, utility work, and related civil improvements while maintaining safe access for motorists, pedestrians, and transit users. Construction has not started and GTS was the lead traffic engineer of record as a sub-consultant to the Civil Lead (Cannon Corporation).
Client Reference: Julian Tochinai Rhoades, PE, QSD/P, Senior Civil Engineer, Cannon Corporation, 949.330.3538, JulianR@ CannonCorp.us
Foothill Boulevard and Viro Road New Traffic Signal Design, City of La Cañada Flintridge (2024 - 2025)
GTS led a multidisciplinary team for the design of a new traffic signal at the T-intersection of Foothill Boulevard and Viro Road.
The project included preparation of traffic signal, signing and striping, and signal timing plans, along with ADA-compliant curb ramp improvements and associated drainage modifications. GTS coordinated the traffic, civil, accessibility, and drainage elements to deliver an integrated and constructible intersection improvement design. GTS provided complete PS&E and construction support services. The engineer’s estimate was at $565,000 and the project was awarded for $581,000.
Client Reference: Maged El-Rabaa, P.E., Director of Public Works/ City Engineer, City of La Cañada Flintridge, (818 ) 790-8882, [email protected]
HSIP Cycle 11 and HSIP Cycle 12 Signal Upgrades at 18
locations and Route 66 Signal Timing, City of Glendora (2024 – Ongoing)
GTS assisted the City of Glendora through HSIP Cycles 11 and 12 in the design of safety improvements at 18 signalized intersections. These locations were previously prioritized as part of the local roadway safety plan. The projects included replacing pedestal mounted signal with mast arms and full upgrades to signal hardware including cabinets, controller, video detection, wiring, and others. GTS also provided an ADA-compliant design at deficient curb ramps and medians. GTS also provided signal timing, construction support services, and funding administration working with the City and Caltrans. HSIP Cycle 11 bid amount was $2,088,000 and construction is anticipated to be completed by November 2026. Design for HSIP Cycle 12 is ongoing with 90% design in progress.
As a separate project, GTS also developed the signal timing and coordination plans for Route 66 within the City of Glendora. GTS scope comprised of field observations and data review, traffic data collection, Synchro and Simtraffic modeling, developing signal timing sheets (including LPI), and implementation support.
Client Reference: Maliha Ansari, Principal Engineer, City of Glendora, 626.914.8294, [email protected]
El Rivino Road and Agua Mansa Road New Traffic Signal
Design, County of San Bernardino, CA (2023)
GTS prepared the traffic signal design for the T-intersection of El Rivino Road and Agua Mansa Road in the County of San Bernardino. The scope included traffic signal plans, specifications and cost estimates, design coordination with the Civil Engineering prime, and construction support services. The traffic signal plans depicted all proposed traffic signal equipment (traffic signal controller cabinets, signal standards, mast arms, vehicle heads, and pedestrian heads) and loop/video detectors.
The project which included civil works was awarded for $725,000 with $205,000 allocated for the traffic signal.
Client Reference: Sheila Amparo, PE, QSP/QSD, Transportation Regional Lead, BKF Engineers, 949.526-8478, [email protected] Hawthorne Blvd and Eddinghill Drive Traffic Signal
Modification, City of Rancho Palos Verdes, CA (2023 - 2025) GTS leveraged AI technology to analyze video footage at this intersection to determine the number of near-misses that occurred over the course of 100 daytime hours. Although the intersection did not meet the collision threshold to require a protected left-turn signal, multiple residents had raised concerns of near-misses at the intersection and the City wanted to quantify the need for a proactive approach to improving safety at this location. AI-powered video analytics allowed GTS to determine the near-misses and to recommend improved safety measures based on a data-driven approach. GTS was then tasked to carry out the signal upgrades which include protected left turn movements and curb ramp upgrades.
10/27/2026 C4 83 of 107
8407: N. SANTA FE AVENUE & ANGELES VISTA DRIVE TRAFFIC SIGNAL 8408: S. SANTA FE AVENUE & SANTA ANITA DRIVE TRAFFIC SIGNAL 4 The project bid cost was $570,000 and was the project was constructed in 2025.
Client Reference: Lincoln Lo, Deputy Public Works Director for RPV at the time of the project, currently Deputy Director/City Engineer, City of Irvine, 949-724-7325, [email protected]
Carlsbad Boulevard Crosswalk Improvements (2020- 2022)
Carlsbad Boulevard is classified as an identity street, per the City’s Mobility Element of the General Plan and currently carries up to 20,000 ADT in certain sections. This project enhances the crosswalks at six locations along Carlsbad Boulevard, at the Army and Navy Academy, Oak Avenue, Sycamore Avenue, Maple
Avenue, Cherry Avenue, and Hemlock Avenue. Traffic calming features include bulb-out/curb extensions to minimize pedestrian crossing distances, in-pavement flashers to accentuate the existing Rectangular Rapid Flashing Beacon (RRFB) system. The existing RRFBs will also be converted from solar powered to AC-powered to limit interruption of the system due to weather conditions In addition, pavement marking improvements were made, including replacing ladder markings with high-visibility continental crosswalks and installing green bicycle lane skip-stripe treatments. Construction was completed in 2023. The bid amount was $775,599, and the final construction cost was $1.65 million, including approximately $660,000 in engineering costs.
Client Reference: Miriam Jim, PE, TE, Project Manager, City of Carlsbad | 442.339.5795 | [email protected]
Community Development Block Grant Funding (CDBG)
Sidewalk Improvement Project (2025 - Ongoing)
The goal of the Community Development Block Grant (CDBG) Sidewalk Improvement project is to improve accessibility in seven unincorporated San Diego communities. Specific project improvements include construction of missing sidewalks, curb and gutter, construction of ADA-compliant pedestrian ramps and curb returns, construction of ADA-compliant driveways, bulb-outs for traffic calming, and retaining walls.
RICK developed plans, specifications, and estimate services for the project. Development of the plans required preparation of improvement plans and profiles, curb return profiles, construction details, retaining wall plans and profiles, and conceptual water pollution control plans. The project also required identification of utility conflicts, identification of right-of-way and easement requirements, and preparation of a SWQMP.
Additional County of San Diego Federally-Funded project experience includes:
• Wing Avenue Flood Control Improvements
• Winter Gardens Boulevard/Winter Gardens Drive Traffic Signal Interconnect
• Countywide Metal Beam Guard Railing Program (PS&E)
Construction has not started.
Client Reference: Hasib Baha, Director of Public Works/Senior Civil Engineer, County of San Diego | 858.694.3206 | hasib.baha@ sdcounty.ca.gov
Plans for Construction of Various Pedestrian Ramps 21/22, North, East, and South (2021 - 2022)
As part of its annual resurfacing program, the County of San Diego identified various locations in pedestrian corridors throughout the county with nonstandard curb ramps. RICK was contracted to evaluate, upgrade, and standardize curb ramp design per the Americans with Disabilities Act (ADA). RICK provided mapping and surveying and engineering design support services for this Department of Public Works Task Order. The project included reconstruction of existing curb ramps or construction of new curb ramps associated with Asphalt Concrete (AC) maintenance projects.
RICK provided mapping and survey fieldwork in support of the 18 different ramp locations. The work included map research, dry labs, topographic survey, and boundary surveys. The ramps were located all over the County of San Diego.
Site layout plans were designed by RICK for 200 ramp locations in total. The team also assisted the County during the construction phase by attending field meetings, supporting Requests for Information (RFIs), and preparing site layout plan revisions.
Construction was carried out in 2022 and 2023. The bid cost was $2,300,000 - $2,400,000 and the final construction cost was $300,000 (ramps only) and $2,300,000 to $2,400,000.
Client Reference: Keith Kezer, Project Manager, County of San Diego | 858.694.3013| [email protected]
Taylor Terrace Public Improvements (2025)
Taylor Terrace is a 51-unit residential community in the City of Vista. The project included roadway widening, ADA-compliant pedestrian facilities, utility upgrades, drainage improvements, and traffic engineering enhancements along Old Taylor Street and East Vista Way, improving safety, accessibility, and mobility for the surrounding community.
As part of the public improvement effort, RICK developed roadway striping and signage plans, public sewer modifications, and coordinated the installation of storm drain, sewer, and dry utility infrastructure within an active roadway environment. RICK also designed and prepared plans and details for curb returns and ramps at two intersections and provided ADA-complaint pedestrian access along the frontage of the site. The team also prepared and implemented multi-stage traffic control strategies to maintain access and safely accommodate construction activities, including a full road closure of Old Taylor Street for critical utility and roadway improvement operations.
Construction is anticipated between 2025 and 2027; bid and final construction costs are to be determined.
Client Reference: Brian Ortwein, Senior Project Manager, TriPointeHomes | 858.332.2283 | Brian.Ortwein@TriPointeHomes. com
10/27/2026 C4 84 of 107
8407: N. SANTA FE AVENUE & ANGELES VISTA DRIVE TRAFFIC SIGNAL 8408: S. SANTA FE AVENUE & SANTA ANITA DRIVE TRAFFIC SIGNAL 5
WORK PLAN
Project Understanding
As part of its continued investment in roadway safety, accessibility, and multimodal mobility, the City of Vista is advancing two new traffic signal projects along the Santa Fe Avenue corridor:
• CIP 8408 – S. Santa Fe Avenue/Santa Anita Drive: construction of a new traffic signal with associated pedestrian and ADA improvements. The project also includes improvements at the adjacent S. Santa Fe Avenue/Santa Fe Place intersection to restrict egress from Santa Fe Place onto S. Santa Fe Avenue through a raised stamped-concrete island and signing and pavement markings that prohibit turns from S. Santa Fe Avenue onto Santa Fe Place.
• CIP 8407 – N. Santa Fe Avenue/Angeles Vista Drive:
construction of a new traffic signal together with ADA and pedestrian connectivity improvements. Based on our field review, there may also be an opportunity to strengthen
pedestrian connectivity toward the existing transit stop north of the intersection; the ultimate limits of sidewalk and corner improvements will be developed with City staff during concept design.
S. Santa Fe Avenue/Santa Anita Drive was identified among the high-priority safety projects in the City’s Comprehensive Safety Action Plan and is also a priority location on the City’s traffic signal program. Both project locations serve a mix of residential, commercial, transit, pedestrian, bicycle, and vehicular activity.
Accordingly, we view these projects not simply as two new traffic signals, but as multidisciplinary intersection improvement projects in constrained existing environments where signal pole placement, ADA accessibility, overhead and underground utilities, drainage, right-of-way, pedestrian connectivity, and constructability must be resolved together.
Our field review and the City’s responses during the RFP process reinforce this understanding. Overhead utilities are expected to be a significant design constraint, particularly in establishing signal pole, mast arm, and luminaire locations. The City’s preference is to design around existing poles where practicable rather than underground existing facilities. Similarly, ADA improvements will be designed to comply with applicable accessibility requirements while accommodating existing grades, driveways, and physical constraints, while the civil improvements should remain focused on the intersection and corner areas rather than expanding into unnecessary corridor reconstruction. Early confirmation of these conditions will therefore be one of our first priorities.
GTS has assembled the team specifically around these design risks. GTS will lead traffic signal, electrical, signing and striping, fiber-optic interconnect, CCTV, signal timing, utility coordination, PS&E, and overall project management. RICK Engineering, will provide topographic/right-of-way surveying and civil design, including ADA, roadway, drainage, stormwater/water-quality requirements, and construction support. AirX will perform targeted potholing to verify critical utility conflicts, and GeoCon will perform the geotechnical investigation and foundation recommendations required for the signal poles. Our team members have previous experience working in the City of Vista and our proposed structure allows the signal and civil designs to develop concurrently rather than sequentially, reducing the potential for late redesign.
Our design process will therefore front-load the decisions that have the greatest potential to affect cost and schedule. Following records research and survey, we will establish the preliminary signal phasing and pole/equipment layout; identify potential conflicts with overhead and underground utilities, ADA improvements, drainage features, and right-of-way; confirm electrical service and fiber interconnect requirements; and identify only those locations where potholing is necessary to resolve a meaningful design conflict. The concept will then be reviewed with City staff before advancing into final PS&E.
The design will incorporate the City’s required CCTV, fiber-optic interconnect, safety illumination, ADA curb ramps and applicable driveway upgrades, signing and striping, pedestrian improvements, erosion control, traffic signal timing and coordination, and the Water Quality Technical Report and associated stormwater requirements.
The existing CMP culvert at Angeles Vista Drive will be assumed to remain in place unless otherwise directed by the City, and no separate corridor pavement rehabilitation or photometric study is anticipated based on the City’s RFP clarifications.
Throughout the assignment, our decisions will be guided by the City’s stated objectives: enhance safety, accessibility, and multimodal mobility; minimize construction and long-term maintenance costs; minimize impacts to traffic and private property; and satisfy applicable stormwater requirements. We will apply the City’s Guidelines for the Preparation of Traffic Signal Design Plans and use early utility verification, coordinated civil/signal design, and formal QA/QC at each milestone to deliver two complete, constructible, and implementation-ready projects while maintaining the City’s schedule and budget.
Preliminary Observations
The GTS Team conducted a preliminary field review of both project intersections to identify physical constraints and opportunities that may influence the signal, ADA, civil, and utility design. The observations below are intended to demonstrate our understanding of the sites and identify issues that should be resolved early in design. They are preliminary and will be verified through topographic and right-of-way survey, utility records, targeted potholing, geotechnical investigation, and coordination with the City and utility providers.
Based on existing geologic information and Geocon’s experience in the area, the site at N. Santa Fe Avenue and Angeles Vista Drive is likely underlain by undocumented fill over Santiago Formation and granitic bedrock. The site at S. Santa Fe Avenue and Santa Anita Drive is likely underlain by undocumented fill over alluvium and granitic bedrock.
10/27/2026 C4 85 of 107
8407: N. SANTA FE AVENUE & ANGELES VISTA DRIVE TRAFFIC SIGNAL 8408: S. SANTA FE AVENUE & SANTA ANITA DRIVE TRAFFIC SIGNAL 6 Our objective will be to resolve the highest-risk design issues early (particularly signal pole placement, ADA geometry, utility conflicts, pedestrian connectivity, visibility, drainage, and access) so that the 60%, 90%, and Final PS&E phases can proceed with minimal redesign. The final improvements will conform to the latest applicable CA MUTCD, City of Vista Guidelines for the Preparation of Traffic Signal Design Plans, City standards, Caltrans standards, San Diego Regional Standard Drawings, and other applicable requirements.
S. Santa Fe Avenue / Santa Anita Drive
1. Commercial Driveway. Although Santa Anita Drive is a three- leg public-street intersection, the commercial driveway opposite Santa Anita Drive effectively introduces an additional access and conflict point that should be considered in the signal phasing, detection, signing/striping, and pedestrian design. This driveway appears to have cross-slope and accessibility conditions that will require evaluation as part of the project.
The GTS Team will develop the preliminary signal layout around known constraints. We will evaluate reconstruction of the driveway and adjacent sidewalk while minimizing impacts to commercial access, landscaping, irrigation, and adjoining improvements.
Commercial Driveway Looking North
2. Existing Curb-Ramp and Sidewalk Deficiencies. Existing pedestrian facilities appear to lack compliant landings and detectable warning surfaces, and portions of the sidewalk show signs of uplift/deterioration. Pedestrian facilities are also incomplete at portions of the intersection.
Our team will develop ADA-compliant corner improvements coordinated with signal pole, push-button, utility, and drainage locations. Rather than committing prematurely to a specific ramp type, we will evaluate directional and multidirectional configurations based on surveyed grades and available landing area.
3. Santa Fe Place Access Modification. The project will restrict egress from Santa Fe Place onto S. Santa Fe Avenue through a raised stamped-concrete island and will prohibit turns from S.
Santa Fe Place onto Santa Fe Avenue through appropriate signing and pavement markings. The several commercial driveways along Santa Fe Place make access and internal circulation an important design consideration.
As such, our team will develop the island, signing, striping, and adjacent driveway treatments as one coordinated access- management concept so that the City’s circulation objective is achieved without creating unintended commercial access or wrong-way movements.
4. Bicycle Accommodation. Bicycle operations should be
considered as part of the signing, striping, and detection design.
The GTS Team will preserve existing bicycle accommodation and incorporate appropriate bicycle detection and striping consistent with City standards and the final roadway configuration.
N. Santa Fe Avenue / Angeles Vista Drive
1. Overhead Utility and Guy-Wire Constraints. Existing utility poles, guy wires, and overhead facilities significantly constrain potential mast-arm and luminaire locations. The City has confirmed that the preferred approach is to work around existing poles where feasible rather than underground existing facilities.
Our team will use the survey of overhead conductors and preliminary pole loading/clearance envelopes to establish feasible signal pole locations early, followed by targeted coordination with SDG&E and other utility providers.
2. Approach Visibility. The horizontal/vertical roadway profile going southbound on N. Santa Fe Avenue appears to limit the distance from which the intersection and future signal indications will be visible to approaching motorists.
Our team will verify approach sight distance and signal visibility during preliminary design and use mast-arm placement, signal- head positioning, and, if warranted, advance warning treatments to maximize signal conspicuity.
3. Pedestrian Accessibility and Missing Facilities. Angeles Vista Drive currently lacks complete sidewalk and curb-ramp facilities, while existing grades and parking along N. Santa Fe Avenue constrain the space available for new ADA improvements.
The GTS team will evaluate corner geometry and ramp alternatives that provide compliant pedestrian access while minimizing impacts to existing on-street parking and adjoining residential properties.
A curb extension may be considered where it materially improves ADA geometry, pedestrian visibility, and crossing conditions.
4. Nearby Childcare and Residential Uses. The childcare use near the intersection, together with adjacent multifamily residential development, increases the importance of intuitive pedestrian crossings, visibility, and accessible corner design. Our team will give particular attention to pedestrian visibility, push-button placement, accessible paths, safety lighting, and the interaction between parking, driveways, and the new signalized crossing.
5. Transit Connectivity Opportunity. An existing bus stop is located north of the intersection, while continuous pedestrian facilities are limited in the immediate area.
During concept development, we will evaluate with the City whether the project can improve the pedestrian connection toward the bus stop without materially expanding the project footprint. Consistent 10/27/2026 C4 86 of 107
8407: N. SANTA FE AVENUE & ANGELES VISTA DRIVE TRAFFIC SIGNAL 8408: S. SANTA FE AVENUE & SANTA ANITA DRIVE TRAFFIC SIGNAL 7 with the City’s RFP clarification, the base proposal will assume corner/curb-return improvements, with any additional sidewalk connection advanced only at City direction.
6. Drainage Constraint. The existing CMP beneath Angeles Vista Drive appears to be shallow and partially buried and may constrain ramp, conduit, or grading improvements.
The project will assume the CMP remains in place as directed by the City and will develop the corner and signal improvements to avoid impacts to the existing drainage facility to the extent feasible.
Existing CMP beneath Angeles Vista Drive
In addition to the above, at both locations, existing underground facilities, fire hydrants, communications facilities, streetlights, and other utilities may constrain signal pole foundations, controller and pull-box placement, and conduit routing.
The GTS Team will establish accurate survey and utility base mapping and will design around known constraints. Utility location and potholing will then be targeted to locations where utility depth/ location could materially affect pole foundations, allowing conflicts to be resolved.
Project Approach
Our approach is straightforward: resolve the constraints before advancing the design. For these two intersections, successful signal design depends on early resolution of right-of-way, utilities, ADA geometry, drainage, overhead facilities, access, electrical service, and pole-foundation conditions.
GTS will build on Vista’s established traffic signal design procedures with an integrated traffic, civil, survey, electrical, utility, and geotechnical workflow. Our objective is to resolve high-cost construction risks early so that the 60% design represents a coordinated, constructible solution rather than a preliminary layout carrying unresolved field risks into later stages.
TASK 1 – PROJECT MANAGEMENT AND DESIGN CONTROL
Aida Edgington, PE, TE, will serve as Project Manager and the City’s primary point of contact, coordinating GTS, RICK, AirX, GeoCon, the City, and affected utility providers. At kick-off, we will confirm project objectives, design criteria, available records, review procedures, utility contacts, schedule, and key decisions for each intersection.
GTS will maintain a Project Action and Risk Log identifying utility conflicts, ROW constraints, ADA and drainage issues, overhead facilities, electrical-service coordination, geotechnical requirements, responsible parties, and decision dates. Monthly progress meetings will focus on upcoming decisions and unresolved issues so City direction is obtained before those matters affect downstream design.
The project schedule will track CIP 8407 and CIP 8408 separately while identifying common activities and external dependencies, including survey, utility responses, potholing, electrical service, geotechnical investigation, City reviews, and PS&E milestones.
Internal multidisciplinary coordination and QA/QC will occur before each formal submittal. Eight City meetings are anticipated, including kick-off and progress/design coordination meetings.
Task 1 Deliverables:
• Kick-off and progress/design coordination meetings
• Agendas, minutes, and action items
• Monthly progress reports
• Baseline and updated project schedules
• Project Action and Risk Log
TASK 2 – CONCEPT DEVELOPMENT
The objective of Task 2 is to establish a reliable existing-condition base, identify the major design constraints, and obtain City concurrence on the preferred signal concepts before advancing to 60% PS&E.
2.1 Records, Standards, and Existing-Condition Review
GTS will compile available City records, as-built plans, ROW and utility information, traffic signal/fiber records, collision information, and other pertinent project documents. The team will review Vista’s Traffic Signal Design Guidelines, City standards, applicable regional and State requirements, and available project information to establish design criteria and identify conditions requiring field verification. Particular attention will be given to ADA facilities, drainage, signing and striping, electrical service, fiber interconnect, overhead utilities, and the Santa Fe Place access modifications.
2.2 Field Review
GTS Team will review both intersections so traffic and civil conditions are evaluated together. The field review will document roadway geometry, signing/striping, curb ramps and driveways, pedestrian connectivity, drainage, utilities, overhead poles/wires/guying, lighting, hydrants, vegetation, grades, access, parking/transit features, and other conditions affecting signal pole placement or civil improvements. Existing curb ramps, affected driveways, and pedestrian facilities will be reviewed for compatibility with current accessibility requirements. Findings will be documented through photographs and field notes and incorporated into the design base.
2.3 Topographic Survey
RICK will perform horizontal and vertical design surveys sufficient to support signal, ADA, roadway, drainage, signing/striping, and pedestrian improvements at both intersections, including the 10/27/2026 C4 87 of 107
8407: N. SANTA FE AVENUE & ANGELES VISTA DRIVE TRAFFIC SIGNAL 8408: S. SANTA FE AVENUE & SANTA ANITA DRIVE TRAFFIC SIGNAL 8 Santa Fe Place improvement area. Surveying will document roadway features; curb, gutter and sidewalk; ramps and driveways; pavement; crowns and flowlines; signing/striping; drainage facilities; visible utilities; traffic infrastructure; significant vegetation; and overhead facilities that could conflict with signal/luminaire poles or mast arms. ROW and centerlines will be developed from recovered monumentation and available record information. RICK will provide AutoCAD design base mapping and a digital surface suitable for multidisciplinary design.
2.4 Utility Coordination
Consistent with Vista’s Traffic Signal Design Guidelines, utility coordination will begin before signal design. GTS will transmit project-location exhibits to utility owners, obtain available records/ as-builts, and incorporate that information into the design base.
GTS will concurrently initiate SDG&E coordination for the electrical service point at each signal. A utility log will track responses, conflicts, and required actions. Draft plans will subsequently be submitted to affected utilities for conflict verification, followed by final plans as required. The design will seek to work around existing overhead poles and minimize utility relocations; undergrounding is not included.
2.5 Base Map
GTS and RICK will combine survey, ROW, utilities, field observations, drainage information, and available records into a coordinated base plan. The team will also prepare a constraint map identifying locations where utilities, overhead facilities, ADA improvements, drainage, ROW, access, vegetation, or other features may affect proposed signal infrastructure. This will serve as the multidisciplinary working tool for establishing feasible pole, foundation, equipment, and civil-improvement locations.
2.6 Signal Concept Development
Using the coordinated base and constraint map, GTS will prepare the City-required 8.5” x 11” conceptual exhibits showing proposed signal phasing and signal indications for each intersection. Concepts will establish preliminary pole/mast-arm locations, pedestrian operation, detection, safety lighting, CCTV, fiber interconnect, and signing/striping requirements. At S. Santa Fe Avenue/Santa Anita Drive, the concept will incorporate the required Santa Fe Place raised stamped-concrete island and signing/markings restricting movements. The concepts will be reviewed with the City and refined into the City-approved redlined concepts before proceeding to 60% PS&E.
Task 2 Deliverables:
• Field notes and photographic documentation
• Design survey and AutoCAD base mapping
• ROW and utility mapping
• Utility coordination/conflict log
• Base map
• 8.5×11 signal concepts / City redlined concepts
TASK 3 – PLANS, SPECIFICATIONS AND ESTIMATES (PS&E)
Following City concurrence on the signal concepts, GTS will prepare separate 60%, 90%, and Final PS&E packages for CIP 8407 and CIP 8408, each with its own City drawing number, plans, specifications, quantities, and construction cost estimate.
The PS&E will comply with Vista’s Traffic Signal Design Guidelines, City standards/templates, applicable San Diego Regional Standards, CA MUTCD, Caltrans standards, Greenbook, and current accessibility requirements.
3.1 Traffic Signal Design
GTS will prepare traffic signal plans at the City-required 1”=20’ scale showing existing and proposed equipment, poles/mast arms, vehicle and pedestrian indications, detection, controller/ cabinet, pull boxes, directional-bore conduit, electrical service, phasing, mast-arm signs, safety luminaires, utilities, schedules, and construction notes.
Pole foundations and base plates will be shown to scale at their exact proposed locations and checked against ROW, curb ramps, pedestrian paths, underground and overhead utilities, drainage, hydrants, driveways, and other constraints. If required, geotechnical recommendations will be incorporated into the foundation design.
GTS will incorporate the electrical service point established through SDG&E coordination, together with associated service equipment, conduit, wiring, loads, and required safety luminaires. Electrical elements will be coordinated with the signal, civil, utility, and ROW designs. Consistent with the City’s clarification, a separate photometric analysis is not anticipated.
3.2 Signing and Striping Design
GTS will prepare signing and striping plans at 1”=20’ scale, including pavement markings, lane lines, crosswalks, stop bars, bicycle-related markings, curb markings, and regulatory/warning signs required to support the new signals. The design will be coordinated with signal operation, pedestrian crossings, detection, ADA improvements, and roadway geometry. The plans will also include the Santa Fe Place island and required signing/markings.
3.3 Civil, ADA, Drainage and Erosion-Control Improvements RICK will design the associated ADA curb ramps and affected driveways/entrances, curb/gutter and localized sidewalk improvements, intersection asphalt repaving, grading/drainage adjustments, Santa Fe Place island, and erosion-control improvements. ADA geometry will be coordinated with signal poles and pedestrian push buttons so the accessible route and signal design function together. Consistent with City clarification, improvements are assumed to remain generally within the intersection/corner areas; corridor-wide pavement rehabilitation is not included, and the existing Angeles Vista CMP will remain in place unless otherwise directed.
3.4 Fiber-Optic Interconnect and CCTV
GTS will prepare fiber-optic interconnect plans connecting each new controller to the City’s existing fiber network using available 10/27/2026 C4 88 of 107
8407: N. SANTA FE AVENUE & ANGELES VISTA DRIVE TRAFFIC SIGNAL 8408: S. SANTA FE AVENUE & SANTA ANITA DRIVE TRAFFIC SIGNAL 9 City as-builts. One CCTV camera will be included at each intersection. Camera placement will be coordinated with the City to provide effective visibility while accounting for pole configuration, overhead facilities, utilities, and other physical constraints.
3.5 Utility Verification and Conflict Resolution
Utility coordination initiated under Task 2 will continue through Final design. Draft plans will be provided to affected utility owners for verification and conflict review.
Where conflicts are identified, GTS will first adjust proposed poles, foundations, conduit, ADA improvements, or other facilities where practical. Relocation will be pursued only where conflicts cannot reasonably be avoided, and GTS will obtain the utility owner’s anticipated relocation design/construction schedule for integration into the project schedule.
3.6 Constructability and Field Verification Review
Before advancing from 60% to 90%, GTS will conduct a focused field constructability review at each intersection. The team will compare the 60% plans with survey, utility mapping/mark-outs, pothole information, and actual field conditions, emphasizing pole/ foundation footprints, conduit routes, curb ramps, push buttons, drainage, electrical service, overhead facilities, driveways, and hydrants. Where beneficial, proposed foundation footprints will be physically measured in the field. Findings will be documented through annotated plans and photographs and resolved before the 90% design.
3.7 Traffic Signal Timing
GTS will develop and test complete signal timing plans using the City’s Q-Free controllers and MaxTime software. Timing will address vehicle, pedestrian, and bicycle operations and coordination with adjacent signals along the respective Santa Fe Avenue corridors.
3.8 Specifications, Quantities and Construction Cost Estimates GTS will prepare separate specifications, bid schedules, quantities, and construction cost estimates for each intersection using the City’s Master Specification template and project-specific technical provisions. Each bid item will have a corresponding specification and measurable quantity. Estimates will be based on current comparable regional bid information and updated at the 60%, 90%, and Final stages.
3.9 Milestone Review and QA/QC
Each submittal will receive multidisciplinary QA/QC before delivery to the City. The 60% review will emphasize layout, foundations, utilities, ADA/civil interfaces, and constructability. The 90% review will emphasize detailed coordination and comment closure. Final QA/QC will confirm consistency among plans, specifications, quantities, bid items, and City/utility comments. This task also includes review of City comments on previous submittals.
GTS will maintain a comment-response matrix for each milestone.
Final documents will be signed and sealed by the designated Engineer of Work.
Task 3 Deliverables:
• Separate 60%, 90%, and Final PS&E packages for CIP 8407 and CIP 8408
• Traffic signal plans
• Signing/striping plans
• Fiber interconnect and CCTV design
• Civil: Demolition/ADA/Repaving/erosion-control
improvements
• Electrical service
• Q-Free/MaxTime timing plans
• Specifications, bid schedules, quantities, and estimates • Utility and comment-response logs
• Final signed/sealed PDF and AutoCAD documents
TASK 4 – BIDDING AND CONSTRUCTION SUPPORT
GTS will remain engaged through bidding and construction so the same team that developed the PS&E is available to efficiently address technical questions and field conditions.
4.1 Bidding Assistance
GTS will respond to bidder questions and requests for clarification and prepare technical responses or revisions for incorporation into City-issued addenda.
4.2 Construction Support
During construction, GTS will participate in the preconstruction meeting and selected site meetings; review technical contractor submittals; respond to RFIs; evaluate proposed field changes; prepare design revisions where required; and provide technical recommendations regarding Contract Change Orders.
4.3 Record Drawings / As-Builts
Following construction, GTS will incorporate contractor/inspector redlines, approved RFIs, design revisions, and change-order information into the record drawings.
Task 4 Deliverables:
• Bidder/RFI responses and bid-analysis support
• Technical submittal reviews
• Design clarifications and revisions
• CCO technical recommendations
• RFI/design-change log
• Final PDF and AutoCAD record drawings
10/27/2026 C4 89 of 107
8407: N. SANTA FE AVENUE & ANGELES VISTA DRIVE TRAFFIC SIGNAL 8408: S. SANTA FE AVENUE & SANTA ANITA DRIVE TRAFFIC SIGNAL 10 TASK 5 – SPECIALTY INVESTIGATIONS AND WATER QUALITY
These specialty tasks will be coordinated directly with the traffic signal and civil design so their findings are incorporated into the PS&E when they can still influence design decisions.
5.1 Water Quality Technical Report / SWQMP
RICK will prepare the City’s Project Determination Checklist to establish applicable stormwater requirements and evaluate potential exemptions. If the project is determined to be a Standard or Priority Project, RICK will prepare the required SWQMP and Municipal Stormwater Permit documentation using the City’s template and BMP Design Manual. Any required permanent BMP or hydromodification measures will be incorporated into the civil and signal design.
This scope assumes the projects will qualify for the City’s Green Streets Priority Development Project (PDP) exemption based on the nature and extent of the proposed improvements. Accordingly, the scope includes a limited stormwater evaluation focused on confirming the applicability of the exemption and documenting the required determination.
Deliverables: Project Determination Checklist; Water Quality Technical Report; SWQMP/supporting documentation if
required.
5.2 Water Pollution Control Plan (WPCP)
RICK will prepare a project-specific WPCP addressing temporary erosion, sediment, tracking, material/waste management, and other applicable construction BMPs. The WPCP will be coordinated with the PS&E erosion-control sheets, construction limits, and anticipated signal, ADA, pavement, drainage, and Santa Fe Place work.
Deliverables: Project-specific WPCP and coordinated BMP information.
5.3 Geotechnical Investigation and Report
GeoCon will perform a focused geotechnical investigation at representative proposed signal-pole locations at both project sites. Services will include preparation of a work plan and required permits, utility locating, traffic control, and approximately one day of small-diameter drilling. Borings are anticipated to extend up to approximately 20 feet or refusal, whichever is shallower. Borings will be sampled to evaluate existing geologic conditions and backfilled and patched following exploration.
Laboratory testing will include, as appropriate, moisture content/ dry density, maximum dry density/optimum moisture content, expansion index, water-soluble sulfate, R-Value, undrained and direct shear strength, consolidation, and grain-size testing.
GeoCon will prepare a limited geotechnical report in accordance with the 2025 California Building Code documenting findings, potential geologic hazards, soil/excavation characteristics, and recommendations for remedial grading, temporary excavations, seismic design parameters, shallow foundations and drilled piers (including axial and lateral capacities), and preliminary pavement and flatwork.
Deliverables: Geotechnical investigation, testing/
analyses, geotechnical report, and pole-foundation design recommendations.
5.4 Utility Potholing, Traffic Control and Report
AirX will perform targeted utility locating and nondestructive potholing where records or preliminary design identify potential conflicts with pole foundations, conduit, ADA improvements, drainage, or other critical infrastructure. AirX will provide required traffic control and document utility type, owner where known, size, material, horizontal location, depth/elevation, photographs, and pothole logs. Verified information will be immediately provided to the design team so improvements can first be adjusted to avoid or minimize conflicts. Where relocation is unavoidable, GTS will coordinate with the affected utility owner.
Deliverables: Potholing traffic control; utility verification; pothole logs/photos; utility-verification report; verified information for incorporation into the plans.
10/27/2026 C4 90 of 107
8407: N. SANTA FE AVENUE & ANGELES VISTA DRIVE TRAFFIC SIGNAL 8408: S. SANTA FE AVENUE & SANTA ANITA DRIVE TRAFFIC SIGNAL
WORK SCHEDULE
MILESTONES AND TASKS
11 /
2 11
/
9 11
/
1 6
11 /
2 3
11 /
3 0
12 /
7 12
/
1 4
12 /
2 1
12 /
2 8
1/4 1/1
1 1/1
8 1/2
5 2/1 2/8 2/1
5 2/2
2 3/1 3/8 3/1
5 3/2
2 3/2
9 4/5 4/1
2 4/1
9 4/2
6 5/3 5/1
0 5/1
7 5/2
4 5/3
1 6/7 6/1
4 6/2
1 6/2
8 7/5 7/1
2 7/1
9 7/2
6 8/2 8/9
Construction
TASK 1 - Project Management and Design Control
Coordination and Meetings
TASK 2 - Concept Development
2.1 Records, Standards, and Existing-Condition Review
2.2 Field Review 1 wk
2.3 Topographic Survey
2.4 Utility Coordination 1 wk
2.5 Base Map
2.6 Signal Concept Development
TASK 3 - Plans, Specifications and Estimates (PS&E) (60%, 90%, Final)
3.1 Traffic Signal Design
3.2 Signing and Striping Design
3.3 Civil, ADA, Drainage and Erosion-Control Improvements
3.4 Fiber Optic Interconnect and CCTV
3.5 Utility Verification and Conflict Resolution*
3.6 Constructability and Field Verification Review 1 wk
3.7 Traffic Signal Timing
3.8 Specifications and Cost Estimates
3.9 Milestone Review and QA/QC
TASK 4 - Bidding and Construction Support
4.1 Bidding Assistance
4.2 Construction Support During Construction
4.3 Assist As-built Plans After Construction
TASK 5 - Speciality Investigations and Water Quality
5.1 SWQMP
5.2 WPCP
5.3 Geotechnical Investigation and Report
5.4 Potholing including Report & Traffic Control
* Relocations will be drive by utility company schedules.
Preliminary Schedule
City Review Time
7 wks
4 wks
4 wks
3 wks 2 wks3 wks 4 wks
Preliminary Schedule
TRAFFIC SIGNALS AT S. SANTA FE AVE/SANTA ANITA DR and N. SANTA FE AVE/ANGELES VISTA DR
CITY OF VISTA
2 wks
4 wks
3 wks
4 wks 2 wks
5 wks
10/27/2026 C4 91 of 107
8407: N. SANTA FE AVENUE & ANGELES VISTA DRIVE TRAFFIC SIGNAL 8408: S. SANTA FE AVENUE & SANTA ANITA DRIVE TRAFFIC SIGNAL
CONSULTANT AGREEMENT COMMENTS
Section Current Language Requested Revision Reason
Section 19.0 –
Indemnification
Other than in the performance of Design Professional services, which shall be solely addressed as in Section 19.1 below, to the fullest extent permitted by law, Contractor shall defend, indemnify and hold City and its officers, officials, employees, and volunteers harmless against any and all liability, loss, damage, fine, penalty, expense, claim or cost (including without limitation costs and fees of litigation) of every nature (collectively, “Liability”) arising out of or in connection with Contractor’s performance under this Contract, including defects in design, except: (1) Liability caused by City’s sole negligence or willful misconduct; or (2) for Liability caused by City’s active negligence, in which case the indemnity received by City shall be reduced by the amount: (i) that City’s active negligence contributed to the Liability on a comparative basis; or (ii) such other amount as may be required by law (“Duty of Indemnification”).
Other than in the performance of Design Professional services, which shall be solely addressed as in Section 19.1 below, to the fullest extent permitted by law, Contractor shall indemnify (but not defend) and hold City and its officers, officials, and employees harmless against loss, damage, fine, penalty, expense, claim or cost (including reasonable costs and fees of litigation) (collectively, “Liability”) arising out of or in connection with Contractor’s performance under this Contract to the extent of Contractor’s negligence or willful misconduct, including defects in design, except for Liability caused by City’s negligence or willful misconduct in which case the indemnity received by City shall be reduced by the amount: (i) that City’s negligence contributed to the Liability on a comparative basis; or (ii) such other amount as may be required by law (“Duty of Indemnification”).
Revisions to the Indemnification provisions are necessary for insurability under a design professional’s insurance policies.
Section 19.1 –
Design Professional
Indemnification
To the fullest extent permitted by law (including, without limitation, California Civil Code Section 2782.8), with respect to the performance of Design Professional services, Contractor shall indemnify and hold harmless the City and its officers, officials, employees and volunteers harmless against all claims, demands or liability that arise out of, pertain to, or relate to the negligence, recklessness, or willful misconduct of Contractor in the performance of Design Professional services under this Contract. In relation to Design Professional services, in no event shall the cost to defend charged to Contractor exceed the Contractor’s proportionate percentage of fault.
To the fullest extent permitted by law (including, without limitation, California Civil Code Section 2782.8), with respect to the performance of Design Professional services, Contractor shall indemnify and hold harmless the City and its officers, officials, and employees harmless against losses or liability that arise out of, pertain to, or relate to the negligence, recklessness, or willful misconduct of Contractor in the performance of Design Professional services under this Contract. In relation to Design Professional services, in no event shall the cost to defend charged to Contractor exceed the Contractor’s proportionate percentage of fault.
Revisions to the Indemnification provisions are necessary for insurability under a design professional’s insurance policies.
Exhibit C –
Deductibles and
Self-Insured
Retentions
Deductibles and Self-Insured Retentions Please confirm the City’s approval of GeoCon Incorporated’s policy deductibles:
Automobile Liability – $1,000 and Professional Liability – $150,000.
GeoCon Incorporated has the following policy deductibles: Automobile Liability - 1,000$ and Professional Liability - 150,000$.
Exhibit C –
References to
“volunteers”
At the option of City, either: the Contractor shall cause the insurer shall reduce or eliminate such deductibles or self-insured retentions as respects City, its officers, officials, employees, and volunteers; or the Contractor shall provide a financial guarantee satisfactory to City guaranteeing payment of losses and related investigations, claim administration, and defense expenses.
Delete references to “volunteers” from the applicable Exhibit C insurance provisions so the language refers to the City, its officers, officials, and employees.
The term “volunteer” is vague, overbroad, ambiguous, and may not be insurable.
Exhibit C –
Other Insurance
Provisions, Item 2
For for any claims related to this Project, the Contractor’s insurance coverage shall be primary insurance as respects City, its officers, officials, employees, and volunteers.
Any insurance or self-insurance maintained by City, its officers, officials, employees, and volunteers shall be excess of the Contractor’s insurance and shall not contribute with it.
Except for Workers’ Compensation, Employer’s Liability, and Professional Liability insurance, for any claims related to this Project, the Contractor’s insurance coverage shall be primary insurance as respects City, its officers, officials, and employees. Any insurance or self-insurance maintained by City, its officers, officials, and employees shall be excess of the Contractor’s insurance and shall not contribute with it.
There is no primary and non-contributory coverage under a Workers’ Compensation, Employer’s Liability, or Professional Liability policy as these policies only cover the Named Insured Party (the Contractor) and none of them extend coverage to third parties (like the City) of any kind. Therefore, by default, Workers’ Compensation, Employer’s Liability, or Professional Liability policies cannot provide primary coverage over that carried by a third party and the third party’s insurance coverage must contribute.
Exhibit C –
Subcontractors
Contractor shall require and verify that all subcontractors maintain insurance meeting all the requirements stated herein, and Contractor shall ensure that City is an additional insured on insurance required from subcontractors.
Contractor shall require and verify that all subcontractors maintain insurance meeting all the requirements stated herein to the extent applicable to the subcontractor’s scope of work and trade, and Contractor shall ensure that City is an additional insured on insurance required from subcontractors.
Not all lower-tier subcontractors hired to provide services will be design professionals or consultants. Some may be contractor entities like drillers, backhoe operators, or private underground utility locators. As contractors, these kinds of entities are not required to carry Professional Liability insurance because it is not applicable to their scope of work or trade. Furthermore, not all lower-tier subcontractors carry 2$ Million limits for General Liability or Automobile Liability coverage, and smaller lower-tier subcontractors may not have Umbrella or Excess Liability coverage to meet the City’s limits. Lower-tier subcontractors should only be required to carry insurance as is applicable to their scope of work and trade.
We kindly request the following edits to the agreement language. 10/27/2026 C4 92 of 107
8407: N. SANTA FE AVENUE & ANGELES VISTA DRIVE TRAFFIC SIGNAL 8408: S. SANTA FE AVENUE & SANTA ANITA DRIVE TRAFFIC SIGNAL Sample work products can be accessed at the following link. Please contact [email protected] for any issues accessing the link.
https://gentecsol-my.sharepoint.com/:f:/p/rawad_hani/IgCm0Td9_Q6zTaxupG2MDa2aAQqQ0f_rHvxA4k6NVvxtrYE?e=3 keYJ9
SAMPLE WORK PRODUCTS
10/27/2026 C4 93 of 107
ADDENDUM
10/27/2026 C4 94 of 107
ADDENDUM NO. 1
Traffic Signal Design for CIP No. 8407: N. Santa Fe Avenue & Angeles Vista Drive Traffic Signal and CIP No. 8408:
S Santa Fe Avenue & Santa Anita Drive Traffic Signal
CIP No. 8407 & 8408 – Addendum 1
July 28, 2026
ADDENDUM NO. 1
To the RFP for:
CITY OF VISTA: TRAFFIC SIGNAL DESIGN FOR CIP No. 8407: N SANTA FE AVE & ANGELES VISTA DR, AND TRAFFIC SIGNAL DESIGN FOR CIP No. 8408: S SANTA FE AVE & SANTA ANITA DR
City of Vista
200 Civic Center Drive
Vista, CA 92084-6240
To All RFP Document Holders of Record: All data, information, scope, term, concepts and proposal directives remain unchanged except the sections or parts of sections added to, revised, deleted or clarified by this Addendum as detailed below.
CHANGES TO THE REQUEST FOR PROPOSAL DOCUMENTS AND TERMS
On page 14, under Section XVI: ESTIMATED TIMELINE, change item number 3 to read:
3. Proposals Due August 12, 2026 at 4:00 PM
Prospective Bidders shall acknowledge their receipt of this Addendum No. 1 and its incorporation into the bid submitted by executing this document in the designated space below and submitting this document with their bid:
10/27/2026 C4 95 of 107
ADDENDUM NO. 1
Traffic Signal Design for CIP No. 8407: N. Santa Fe Avenue & Angeles Vista Drive Traffic Signal and CIP No. 8408:
S Santa Fe Avenue & Santa Anita Drive Traffic Signal
CIP No. 8407 & 8408 – Addendum 1
I hereby acknowledge that I have received Addendum No. 1 and its provisions have been incorporated into the attached bid proposal.
____________________________________________________________ By Date
____________________________________________________________ Company
General Technologies and Solutions (GTS)
8/19/2026
10/27/2026 C4 96 of 107
ADDENDUM NO. 2
Traffic Signal Design for CIP No. 8407: N. Santa Fe Avenue & Angeles Vista Drive Traffic Signal and CIP No. 8408:
S Santa Fe Avenue & Santa Anita Drive Traffic Signal
CIP No. 8407 & 8408 – Addendum 2
August 4, 2026
ADDENDUM NO. 2
To the RFP for:
CITY OF VISTA: TRAFFIC SIGNAL DESIGN FOR CIP No. 8407: N SANTA FE AVE & ANGELES VISTA DR, AND TRAFFIC SIGNAL DESIGN FOR CIP No. 8408: S SANTA FE AVE & SANTA ANITA DR
City of Vista
200 Civic Center Drive
Vista, CA 92084-6240
To All RFP Document Holders of Record: All data, information, scope, term, concepts and proposal directives remain unchanged except the sections or parts of sections added to, revised, deleted or clarified by this Addendum as detailed below.
CHANGES TO THE REQUEST FOR PROPOSAL DOCUMENTS AND TERMS
On page 3, under Section III: PROPOSED SCOPE OF SERVICES, revise letter F to read:
Prepare 60%, 90% and Final Plans, Specifications and Estimates for construction of traffic signals and related infrastructure at N. Santa Fe Avenue/Angeles Vista Drive and S. Santa Fe Avenue/Santa Anita Drive. This signal design work includes connecting to existing fiber optic interconnect, ADA curb ramps including any utility relocations required and relocation/removal of obstructions, pedestrian facility improvements, signing & striping, and temporary erosion control.
As part of the signing and striping plans for the intersection of S. Santa Fe Avenue and Santa Fe Place, include a design to restrict egress from Santa Fe Place onto S. Santa Fe Avenue including a raised stamped concrete island on Santa Fe Place at S. Santa Fe Avenue, and appropriate signage and markings prohibiting turns from S. Santa Fe Avenue onto Santa Fe Place.
10/27/2026 C4 97 of 107
ADDENDUM NO. 2
Traffic Signal Design for CIP No. 8407: N. Santa Fe Avenue & Angeles Vista Drive Traffic Signal and CIP No. 8408:
S Santa Fe Avenue & Santa Anita Drive Traffic Signal
CIP No. 8407 & 8408 – Addendum 2
Prospective Bidders shall acknowledge their receipt of this Addendum No. 2 and its incorporation into the bid submitted by executing this document in the designated space below and submitting this document with their bid:
I hereby acknowledge that I have received Addendum No. 2 and its provisions have been incorporated into the attached bid proposal.
____________________________________________________________ By Date
____________________________________________________________ Company
Rawad Hani, Principal of GTS 08/05/26
General Technologies and Solutions (GTS) Inc.
10/27/2026 C4 98 of 107
ADDENDUM NO. 3
Traffic Signal Design for CIP No. 8407: N. Santa Fe Avenue & Angeles Vista Drive Traffic Signal and CIP No. 8408:
S Santa Fe Avenue & Santa Anita Drive Traffic Signal
CIP No. 8407 & 8408 – Addendum 3
August 6, 2026
ADDENDUM NO. 3
To the RFP for:
CITY OF VISTA: TRAFFIC SIGNAL DESIGN FOR CIP No. 8407: N. SANTA FE AVE. & ANGELES VISTA DR., AND TRAFFIC SIGNAL DESIGN FOR CIP No. 8408: S. SANTA FE AVE. & SANTA ANITA DR.
City of Vista
200 Civic Center Drive
Vista, CA 92084-6240
To All RFP Document Holders of Record: All data, information, scope, term, concepts and proposal directives remain unchanged except the sections or parts of sections added to, revised, deleted or clarified by this Addendum as detailed below.
CHANGES TO THE REQUEST FOR PROPOSAL DOCUMENTS AND TERMS
1. On page 2, under Section I: INTRODUCTION, replace the final sentence with the following:
Responses to this RFP will be accepted until 4:00 pm on Thursday, August 19, 2026.
2. On page 14, under Section XVI: ESTIMATED TIMELINE, replace number 3 with the following:
3. Proposals Due August 19, 2026, at 4:00 PM
3. On page 4, under Section III, PROPOSED SCOPE OF SERVICES, add the following under letter F, subpart ii:
10/27/2026 C4 99 of 107
ADDENDUM NO. 3
Traffic Signal Design for CIP No. 8407: N. Santa Fe Avenue & Angeles Vista Drive Traffic Signal and CIP No. 8408:
S Santa Fe Avenue & Santa Anita Drive Traffic Signal
CIP No. 8407 & 8408 – Addendum 3
Obtain pothole information for utility conflicts and adjust locations of facilities to avoid or minimize conflicts if possible. Request relocation of utility facilities where conflicts cannot be avoided. Obtain schedule of relocation design and construction from utility companies.
4. On page 5, under Section III, PROPOSED SCOPE OF SERVICES, add the following as new letter N:
N. Water Quality Technical Report: Prepare a Project Determination Checklist using the template provided by the City. The City of Vista has determined that the Urban Runoff Threat Assessment is “high” for all projects. If the project is determined to be a Standard or Priority Project, prepare a Stormwater Quality Management Plan (SWQMP) using the template provided by the City. Prepare Municipal Stormwater Permit documentation in accordance with San Diego Regional Water Quality Control Board Order No. R9-2013-0001/2015-0001, using the City of Vista BMP Design Manual. Determine applicable design requirements. Evaluate potential for any exemptions. Submit report to the City for review and make changes as requested by the City. Incorporate any required hydro-modification improvements and permanent BMP’s into the project design.
5. On page 5, under Section III, PROPOSED SCOPE OF SERVICES, add the following as new letter O:
O. Geotechnical Report: Perform a geotechnical investigation of on-site soil conditions to characterize soil conditions in the vicinity of signal pole foundations.
Testing shall determine shear strength, soil friction angle, minimum unit weight of the soil and depth to groundwater. Consultant shall prepare a geotechnical report with foundation recommendations, including lateral resistance analysis, torsional resistance analysis, and axial resistance analysis.
Prospective Bidders shall acknowledge their receipt of this Addendum No. 3 and its incorporation into the bid submitted by executing this document in the designated space below and submitting this document with their bid:
I hereby acknowledge that I have received Addendum No. 3 and its provisions have been incorporated into the attached bid proposal.
____________________________________________________________ By Date
____________________________________________________________ Company
General Technologies and Solutions (GTS)
8/19/2026
10/27/2026 C4 100 of 107
531 Encinitas Boulevard, Suite 202, Encinitas, CA 92024 619 878 8069 [email protected]
SMART TRANSPORTATION STARTS HERE
In delivering high-quality service, GTS will focus on:
✓Responsiveness
✓Clear communications
✓Meeting established deadlines
✓Maintaining positive working relationships
✓Providing creative, yet implementable solutions
10/27/2026 C4 101 of 107
HOURLY RATE $280 $245 $160 $130 $300 $285 $250 $190 $170 $175 $315 TASK 1 - Project Management and Design Control
Coordination and Meetings 4 24 8 8 22 4 70 $16,860.00 $16,860.00 Subtotal:$16,860.00
TASK 2 - Concept Development
2.1 Records, Standards, and Existing-Condition Review 2 4 4 2 10 5 27 $4,900.00 $4,900.00
2.2 Field Review 8 8 16 $3,240.00 $3,240.00
2.3 Topographic Survey 4 40 44 $13,800.00 $13,800.00
2.4 Utility Coordination 4 4 $640.00 $640.00
2.5 Base Map 2 4 6 4 8 10 16 50 $9,550.00 $9,550.00
2.6 Concept Development 2 4 16 16 1 8 10 57 $10,380.00 $10,380.00 Subtotal:$42,510.00
TASK 3 - Plans, Specifications and Estimates (PS&E) (60%, 90%, Final)
3.1 Traffic Signal Design 6 12 36 56 110 $17,660.00 $17,660.00
3.2 Signing and Striping Design 6 12 22 38 78 $13,080.00 $13,080.00
3.3 Civil, ADA, Drainage and Erosion-Control Improvements
3.3.1 Demolition Plan 6 6 10 22 $4,340.00 $4,340.00
3.3.2 ADA Ramp Design 2 10 34 10 56 $11,260.00 $11,260.00
3.3.3 Repaving Plan 3 10
3.3.4 Erosion Control Plan 6 7 14 27 $5,210.00 $5,210.00
3.4 Fiber Optic Interconnect and CCTV 6 8 24 24 62 $10,600.00 $10,600.00
3.5 Utility Verification and Conflict Resolution 3 4 2 7 11 4 8 39 $9,035.00 $9,035.00
3.6 Constructability and Field Verification Review 4 4 $640.00 $640.00
3.7 Traffic Signal Timing 6 6 14 8 34 $6,430.00 600.00$ $7,030.00
3.8 Specifications and Cost Estimates 4 8 20 8 26 8 8 82 $18,060.00 $18,060.00
3.9 Milestone Review and QA/QC 2 12 6 7 17 0 8 52 $12,170.00 $12,170.00 Subtotal:$109,085.00
TASK 4 - Bidding and Construction Support
4.1 Bidding Assistance 4 0 0 0 6 0 2 12 $2,480.00 $2,480.00
4.2 Construction Support/Site Punch List 3 0 $0.00 $0.00
4.3 Assist As-built Plans 3 0 $0.00 $0.00
Subtotal:$2,480.00
TASK 5 - Speciality Investigations and Water Quality
5.1 SWQMP 3 9 9 8 29 $6,175.00 $6,175.00
5.2 WPCP 2 6 15 23 $4,920.00 $4,920.00
5.3 Geotechnical Investigation 1 0 $0.00 $0.00
5.4 Utility Locating / Potholing 2 0 $0.00 5,400.00$ $5,400.00 $16,495.00
OTHER DIRECT COST- includes traffic counts and utility locating. TOTAL COST3 $190,080.00 3 Services assumed to be part of the construction phase. This cost excludes traffic control for the project as a whole, except for traffic control required for speciality investigations. 2 Utility Locating / Potholing: As a value-engineering measure, GTS proposes to perform private utility locating using electromagnetic (EM) and ground-penetrating radar (GPR) methods in lieu of design-phase potholing. Unlike 811/DigAlert markings, which are primarily intended for damage prevention prior to excavation, private locating provides the design team with a more comprehensive understanding of the approximate horizontal alignment of detectable underground utilities, allowing proposed signal poles, conduits, pull boxes, and other improvements to be positioned to avoid identified conflicts. Because positive verification of utility depth is generally not provided by these non-destructive locating methods, targeted potholing can be performed during construction where vertical clearance becomes critical. The plans and specifications will require the contractor to verify utilities prior to excavation and will include appropriate bid provisions to accommodate field conditions, including an alternate/larger pole foundation where warranted. Should field verification identify a conflict requiring a minor adjustment to the proposed signal design, GTS will make the necessary design adjustment at no additional cost to the City. This approach maintains appropriate utility-risk management while avoiding the cost of extensive potholing during the design phase. 1 Geotechnical Investigation: As a value-engineering measure, GTS proposes that a project-specific geotechnical investigation not be performed during the design phase unless site conditions indicate otherwise. Traffic signal pole foundations will be designed using the applicable Caltrans Standard Plans and Specifications, which establish standard foundation configurations and associated soil/design criteria. During design, GTS will review available information and observed site conditions to confirm that there are no indications of unusual soil, groundwater, slope, or other conditions that would warrant a special foundation design. Based on the currently available information, special foundation design is not anticipated. The construction documents will require the contractor to verify field conditions during excavation; if conditions inconsistent with the applicable standard foundation assumptions are encountered, GTS will evaluate the condition and, if warranted, recommend a targeted geotechnical assessment and appropriate foundation modification. This approach avoids the cost of a project-wide geotechnical investigation while maintaining provisions to address localized or unforeseen conditions should they arise.
Su
r
v
e
y
2 -
pe
r
s
o
n
c
r
e
w
Subtotal:
TO
T
A
L
HO
U
R
S
TO
T
A
L
LA
B
O
R
C
O
S
T
OT
H
E
R
DI
R
E
C
T
CO
S
T
Fee Schedule
TRAFFIC SIGNALS AT S. SANTA FE AVE/SANTA ANITA DR and N. SANTA FE AVE/ANGELES VISTA DR
CITY OF VISTA
MILESTONES AND TASKS
Pr
i
n
c
i
p
a
l
/
QA
&
Q
C
Pr
o
j
e
c
t
Ma
n
a
g
e
r
Se
n
i
o
r
T
r
a
f
f
i
c
En
g
i
n
e
e
r
As
s
i
s
t
a
n
t
Tr
a
f
f
i
c
En
g
i
n
e
e
r
Pr
i
n
c
i
p
a
l
C
i
v
i
l
As
s
o
c
i
a
t
e
Ci
v
i
l
To
t
a
l
C
o
s
t
Pr
i
n
c
i
p
a
l
Ma
n
a
g
e
r
C
i
v
i
l
Pr
i
n
c
i
p
a
l
De
s
i
g
n
e
r
C
i
v
i
l
As
s
o
c
i
a
t
e
De
s
i
g
n
e
r
C
i
v
i
l
As
s
o
c
i
a
t
e
Su
r
v
e
y
A
n
a
l
y
s
t
10/27/2026 C4 102 of 107
00051960 4 Exhibit C, Page 1 of 3
EXHIBIT C
INSURANCE REQUIREMENTS
Contractor shall procure and maintain for the duration of the contract, insurance against claims for injuries to persons or damages to property which may arise from or in connection with the performance of the work hereunder by the Contractor, his agents, representatives, employees, or subcontractors. Nothing in these provisions shall limit Contractor’s Duty of Indemnification.
MINIMUM SCOPE AND LIMIT OF INSURANCE
Coverage shall be at least as broad as:
1. Commercial General Liability (“CGL”): Insurance Services Office Form CG 00 01 covering CGL on an “occurrence” basis, including products, completed operations, property damage, bodily injury, and personal & advertising injury with limits no less than $2,000,000 per occurrence. If a general aggregate limit applies, either the general aggregate limit shall apply separately to this Project/location or the general aggregate limit shall be twice the required occurrence limit.
2. Automobile Liability: Insurance Services Office Form Number CA 0001 covering Code 1 (any auto), with limits no less than $2,000,000 per accident for bodily injury and property damage.
3. Workers’ Compensation insurance as required by the State of California, with Statutory Limits, and Employers’ Liability insurance with a limit of no less than $1,000,000 per accident for bodily injury or disease.
Contractor shall also provide the additional coverages checked below and at least as broad as:
4. Professional Liability, with limits no less than $1,000,000 per occurrence or claim, and $2,000,000 policy aggregate.
If the Contractor maintains higher limits than the minimums shown above, City requires and shall be entitled to coverage for the higher limits maintained by the Contractor. Any available insurance proceeds in excess of the specified minimum limits of insurance and coverage shall be available to City.
Deductibles and Self-Insured Retentions
Any deductibles or self-insured retentions must be declared to and approved by City. At the option of City, either: the Contractor shall cause the insurer shall reduce or eliminate such deductibles or self-insured retentions as respects City, its officers, officials, employees, and volunteers; or the Contractor shall provide a financial guarantee satisfactory to City guaranteeing payment of losses and related investigations, claim administration, and defense expenses.
Other Insurance Provisions
The insurance policies are to contain, or be endorsed to contain, the following provisions:
1. The City, its officers, officials, employees, and volunteers are to be covered as additional insureds on the CGL policy with respect to liability arising out of with respect 10/27/2026 C4 103 of 107
00051960 4 Exhibit C, Page 2 of 3
to liability arising out of work or operations performed by or on behalf of the Contractor including materials, parts, or equipment furnished in connection with such work or operations and automobiles owned, leased, hired, or borrowed by or on behalf of the Contractor. General liability coverage can be provided in the form of an endorsement to the Contractor’s insurance (at least as broad as ISO Form CG 20 10, CG 11 85 or both CG 20 10 and CG 20 37 forms if later revisions used), unless otherwise approved in advance by City.
2. For any claims related to this Project, the Contractor’s insurance coverage shall be primary insurance as respects City, its officers, officials, employees, and volunteers.
Any insurance or self-insurance maintained by City, its officers, officials, employees, and volunteers shall be excess of the Contractor’s insurance and shall not contribute with it.
3. Each insurance policy required by this clause shall provide that coverage shall not be canceled, except with notice to City.
Claims Made Policies
If any coverage required is written on a claims-made coverage form:
1. The retroactive date must be shown, and this date must be before the execution date of the contract or the beginning of contract work.
2. Insurance must be maintained and evidence of insurance must be provided for at least five (5) years after completion of contract work.
3. If coverage is canceled or non-renewed, and not replaced with another claims-made policy form with a retroactive date prior to the contract effective, or start of work date, the Contractor must purchase extended reporting period coverage for a minimum of five (5) years after completion of contract work.
4. A copy of the claims reporting requirements must be submitted to City for review.
Acceptability of Insurers
Insurance is to be placed with insurers with a current A.M. Best rating of no less than A: VII, unless otherwise acceptable to City.
Waiver of Subrogation
Contractor hereby agrees to waive rights of subrogation which any insurer of Contractor may acquire from Contractor by virtue of the payment of any loss. Contractor agrees to obtain any endorsement that may be necessary to affect this waiver of subrogation. The Workers’ Compensation policy shall be endorsed with a waiver of subrogation in favor of City for all work performed by the Contractor, its employees, agents and subcontractors.
Verification of Coverage
Contractor shall furnish City with original certificates and amendatory endorsements, or copies of the applicable insurance language, effecting coverage required by this contract. All certificates and endorsements are to be received and approved by City before work commences. However, failure to obtain the required documents prior to the work beginning shall not waive the Contractor’s obligation to provide them. City reserves the right to require 10/27/2026 C4 104 of 107
00051960 4 Exhibit C, Page 3 of 3
complete, certified copies of all required insurance policies, including endorsements, required by these specifications, at any time.
Subcontractors
Contractor shall require and verify that all subcontractors maintain insurance meeting all the requirements stated herein, and Contractor shall ensure that City is an additional insured on insurance required from subcontractors. For CGL coverage, subcontractors shall provide coverage with a format least as broad as CG 20 38 04 13.
Special Risks or Circumstances
City reserves the right to modify these requirements, including limits, based on the nature of the risk, prior experience, insurer, coverage, or other circumstances.
10/27/2026 C4 105 of 107
00051960 4 Exhibit D
AGREEMENT TO COMPLY WITH CALIFORNIA LABOR LAW REQUIREMENTS [Labor Code §§ 1720, 1771.1, 1773.8, 1775, 1776, 1777.5, 1813, 1860, 1861, 3700] The undersigned Contractor certifies that it is aware of and hereby agrees to fully comply with the following provisions of California law:
1. No contractor or subcontractor may be listed on a bid proposal for a public works project (submitted on or after March 1, 2015) unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5 [with limited exceptions from this requirement for bid purposes only under Labor Code section 1771.1(a)]. No contractor or subcontractor may be awarded a contract for public work on a public works project (awarded on or after April 1, 2015) unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5. This project is subject to compliance monitoring and enforcement by the Department of Industrial Relations.
2. Contractor acknowledges that this contract is subject to the provisions of Division 2, Part 7, Chapter 1 (commencing with Section 1720) of the California Labor Code relating to public works and the awarding public agency (“Agency”) and agrees to be bound by all the provisions thereof as though set forth in full herein.
3. Contractor agrees to comply with the provisions of California Labor Code Section 1773.8 which requires the payment of travel and subsistence payments to each worker needed to execute the work to the extent required by law.
4. Contractor agrees to comply with the provisions of California Labor Code Sections 1774 and 1775 concerning the payment of prevailing rates of wages to workers and the penalties for failure to pay prevailing wages. The Contractor shall, as a penalty to the Agency, forfeit not more than fifty dollars ($50) for each calendar day, or portion thereof, for each worker paid less than the prevailing rates as determined by the Director of Industrial Relations for the work or craft in which the worker is employed for any p ublic work done under the contract by Contractor or by any subcontractor.
5. Contractor agrees to comply with the provisions of California Labor Code Section 1776 which require Contractor and each subcontractor to (1) keep accurate payroll records, (2) certify and make such payroll records available for inspection as provided by Section 1776, and (3) inform the Agency of the location of the records. The Contractor is responsible for compliance with Section 1776 by itself and all of its subcontractors.
6. Contractor agrees to comply with the provisions of California Labor Code Section 1777.5 concerning the employment of apprentices on public works projects, and further agrees that Contractor is responsible for compliance with Section 1777.5 by itself and all of its subcontractors.
7. Contractor agrees to comply with the provisions of California Labor Code Section 1813 concerning penalties for workers who work excess hours. The Contractor shall, as a penalty to the Agency, forfeit twenty-five dollars ($25) for each worker employed in the execution of the contract by the Contractor or by any subcontractor for each calendar day during which such worker is required or permitted to work more than 8 hours in any one calendar day and 40 hours in any one calendar week in violation of the provisions of Division 2, Part 7, Chapter 1, Article 3 of the California Labor Code.
8. California Labor Code Sections 1860 and 3700 provide that every contractor will be required to secure the payment of compensation to its employees. In accordance with the provisions of California Labor Code Section 1861, Contractor hereby certifies as follows:
“I am aware of the provisions of Section 3700 of the Labor Code which require every employer to be insured against liability for worker’s compensation or to undertake self-insurance in accordance with the provisions of that code, and I will comply with suc h provisions before commencing the performance of the work of this contract.”
Signature Date
Name/Title Company:
10/27/2026 C4 106 of 107
00051960 4 Exhibit E
EXHIBIT E
SPECIAL PROVISIONS
This Contract is subject to the following provisions, if checked:
1. State of California grant conditions, as attached.
2. Federal grant conditions, as attached.
3. Other conditions, as attached.
10/27/2026 C4 107 of 107