Cities Index.
Agenda, first session

Wasco City Council
December 28, 2022

Document
Agenda, first session
Meeting
December 28, 2022
Body
Wasco City Council
Pages
21
Original file
18.7 MB
Text extracted from the city's file for reading and search. Open the original on www.cityofwasco.org. That file is the official record.

Appendix E: Federal Terms And Conditions

APPENDIX E: FEDERAL TERMS AND CONDITIONS

1. FEDERAL REQUIREMENTS
The Contractor understands that the Authority has received Federal funding from the Federal Rail Administration (FRA) and may receive additional Federal funding from the FRA, U.S. DOT and/or other Federal agencies, and acknowledges that it is required to comply with all applicable federal laws, regulations, policies, and related administrative practices, whether or not they are specifically referenced herein. The Contractor acknowledges that federal laws, regulations, policies, and related administrative practices may change and that such changed requirements will apply.

The Contractor shall ensure compliance by its Subcontractors and include appropriate flow down provisions in each of its lower-tier Subcontracts as required by applicable federal laws, regulations, policies, and related administrative practices, whether or not specifically referenced herein.

Notwithstanding anything to the contrary contained in this Agreement, all FRA mandated terms shall be deemed to control in the event of a conflict with other provisions contained in this Agreement. The Contractor shall not perform any act, fail to perform any act, or refuse to comply with any Authority requests, which would cause the Authority to be in violation of FRA requirements.

References to the amended Federal Railroad Administration Grant Cooperative Agreement No. FR-HSR-0009‐10‐01‐06 (ARRA Grant) provisions herein are also deemed to apply in principle to the FRA Grant Cooperative Agreement No. FR-HSR- 0118012, as amended (FY 10 Grant) and/or any future FRA, U.S. DOT, or other Federal agency Grant/Cooperative Agreement requirements, including but not limited to reporting requirements and related obligations. The Contractor acknowledges that it is required to comply with, and adhere to, all requisite Federal requirements from the FRA, UD DOT and/or other Federal agencies that apply, or will apply.

2. COMPLIANCE WITH FEDERAL REQUIREMENTS
The Contractor’s failure to comply with Federal Requirements shall constitute a breach of this Agreement.

3. FEDERAL PROCUREMENT STANDARDS
The Contractor agrees to comply with the Procurement Standards requirements set forth at 49 C.F.R. Section 18.36, and with applicable supplementary U.S.

Department of Transportation (U.S. DOT) or FRA directives or regulations. If determined necessary for proper Project administration, FRA reserves the right to review the Contractor’s technical specifications and requirements.

4. FEDERAL LOBBYING ACTIVITIES CERTIFICATION
The Contractor certifies, to the best of its knowledge and belief, that:

City of Wasco – Ownership and Maintenance Agreement
HSR 2x-xx

Page 2 of 21 ends

Appendix E: Federal Terms And Conditions

4.1 No state or federal appropriated funds have been paid or will be paid, by or on behalf of the Contractor, to any person for influencing or attempting to influence an officer or employee of any state or Federal agency, a member of the State Legislature or United States Congress, an officer or employee of the Legislature or Congress, or any employee of a member of the Legislature or Congress in connection with the awarding of any State or Federal agreement, the making of any State or Federal grant, the making of any State or Federal loan, the entering into of any cooperative agreement, and the extension, continuation, renewal, amendment, or modification of any State or Federal agreement, grant, loan, or cooperative agreement.

4.2 If any funds other than federal appropriated funds have been paid or will be paid to any person for influencing or attempting to influence an officer or employee of any federal agency, a member of Congress, an officer or employee of Congress, or an employee of a member of Congress in connection with this agreement, grant, loan, or cooperative agreement, the Contractor shall complete and submit Standard Form LLL, "Disclosure Form to Report Lobbying,” in accordance with its instructions.

4.3 This certification is a material representation of fact upon which reliance was placed when this transaction was made or entered into. Submission of this certification is a prerequisite for making or entering into this transaction imposed by 31 U.S.C. section 13 52. Any person who fails to file the required certification shall be subject to a civil penalty of not less than $10 ,000 and not more than $10 0,000 for each failure.

4.4 The Contractor also agrees that by signing this document, it shall require that the language of this certification be included in all lower-tier Subcontracts, which exceed $100, 000, and that all such Subcontractors shall certify and disclose accordingly.

5. DEBARMENT AND SUSPENSION
This Agreement is a covered transaction for purposes of 2 C.F.R. Part 1200. As such, the Contractor is required to comply with applicable provisions of Executive Orders Nos. 12549 and 12689; “Debarment and Suspension,” 31 U.S.C. section 6101 note; and U.S. DOT regulations, “Non-procurement Suspension and Debarment,” 2 C.F.R. Part 1200, which adopt and supplement the provisions of U.S.

Office of Management and Budget (U.S. OMB) “Guidelines to Agencies on Government-wide Debarment and Suspension (Non-procurement),” 2 C.F.R. Part 180.

To the extent required by the aforementioned U.S. DOT regulations and U.S. OMB guidance, the Contractor must verify that each Subcontractor is not excluded or disqualified in accordance with said regulations by reviewing the “Excluded Parties Listing System” at www.sam.gov/portal/public/SAM/. The Contractor shall obtain City of Wasco – Ownership and Maintenance Agreement
HSR 2x-xx

Page 3 of 21 ends

Appendix E: Federal Terms And Conditions

appropriate certifications from each such Subcontractor and provide such certifications to the Authority.

The Contractor’s signature affixed herein shall also constitute a certification under penalty of perjury under the laws of the State of California that the Contractor or any person associated therewith in the capacity of owner, partner, director, officer or manager:

1. Is not currently under suspension, debarment, voluntary exclusion, or determination of ineligibility by any federal agency;

2. Have not had one or more public transactions (federal, state, and local) terminated within the preceding three years for cause or default;

3. Has not been convicted within the preceding three years of any of the offenses listed in 2 C.F.R. section 180. 800(a) or had a civil judgment rendered against it for one of those offenses within that time period; and,

4. Are not presently indicted for or otherwise criminally or civilly charged by a government entity (federal, state or local) with commission of any of the offenses listed in 2 C.F.R. section 180. 800.

Should the Contractor or any Subcontractor become excluded or disqualified as defined in this section during the life of the Agreement, the Contractor shall immediately inform the Authority of this exclusion or disqualification.

The Contractor shall include a term or condition in the Agreement documents for each lower-tier covered transaction, assuring that, to the extent required by the U.S.

DOT regulations and U.S. OMB guidance, each Subcontractor will review the “Excluded Parties Listing System,” will obtain certifications from lower-tier Subcontractors, and will include a similar term or condition in each of its lower-tier covered transactions.

6. SITE VISITS
The Contractor agrees that FRA, through its authorized representatives, has the right, at all reasonable times, to make site visits to review Project accomplishments and for other reasons. If any site visit is made by FRA on the premises of the Contractor or any of its Subcontractors under this Agreement, the Contractor shall provide and shall require its Subcontractors to provide, all reasonable facilities and assistance for the safety and convenience of FRA representatives in the performance of their duties. All site visits and evaluations shall be performed in such a manner as will not unduly delay work being conducted by the Contractor or Subcontractor.

City of Wasco – Ownership and Maintenance Agreement
HSR 2x-xx

Page 4 of 21 ends

Appendix E: Federal Terms And Conditions

7. SAFETY OVERSIGHT
To the extent applicable, the Contractor agrees to comply with any Federal regulations, laws, or policies and other guidance that FRA or U.S. DOT may issue pertaining to safety oversight in general, and in the performance of this Agreement, in particular.

8. ENVIRONMENTAL PROTECTION
The Contractor and any Subcontractor under this Agreement shall comply with all applicable environmental requirements and regulations, including any amendments, as follows:

8.1 Clean Air: The Contractor agrees to comply with all applicable standards, orders or regulations issued pursuant to the Clean Air Act, as amended, 42 U.S.C. sections 7401 et seq. The Contractor agrees to report each violation to the Authority, and understands and agrees that the Authority shall, in turn, report each violation as required to assure notification to the FRA and the appropriate Environmental Protection Agency Regional Office.

8.2 Clean Water: The Contractor agrees to comply with all applicable standards, orders or regulations issued pursuant to the Federal Water Pollution Control Act, as amended, 33 U.S.C. sections 12 51 et seq. The Contractor agrees to report each violation to the Authority, and understands and agrees that the Authority shall, in turn, report each violation as required to assure notification to the FRA and the appropriate EPA Regional Office.

8.3 Energy Conservation: The Contractor agrees to comply with mandatory standards and policies relating to energy efficiency which are contained in the State energy conservation plan issued in compliance with the Energy Policy and Conservation Act (42 U.S.C. sections 6421 et seq.)

8.4 Agreement Not To Use Violating Facilities: The Contractor agrees not to use any facility to perform work hereunder that is listed on the List of Violating Facilities maintained by the EPA. The Contractor shall promptly notify the Authority if the Contractor or any Subcontractor receives any communication from the EPA indicating that any facility which will be used to perform work pursuant to this Agreement is under consideration to be listed on the EPA’s List of Violating Facilities; provided, however, that the Contractor’s duty of notification hereunder shall extend only to those communications of which it is aware, or should reasonably have been aware.

8.5 Environmental Protection: The Contractor shall comply with all applicable requirements of the National Environmental Policy Act of 1 969, as amended, 42 U.S.C. sections 4321 et seq.

City of Wasco – Ownership and Maintenance Agreement
HSR 2x-xx

Page 5 of 21 ends

Appendix E: Federal Terms And Conditions

8.6 Incorporation of Provisions: The Contractor shall include the above provisions (A) through (F) in every subcontract hereunder exceeding $50,000 financed in whole or in part with federal assistance provided by the FRA.

9. CIVIL RIGHTS
The following requirements apply to this Agreement:

9.1 Nondiscrimination: In accordance with Title VI of the Civil Rights Act, as amended, 42 U.S.C. section 2000d; section 303 of the Age Discrimination Act of 1975 , as amended, 42 U.S.C. section 61 02; section 202 of the Americans with Disabilities Act of 199 0, 42 U.S.C. section 1213 2; and 49 U.S.C. section 306, the Contractor agrees that it will not discriminate against any individual because of race, color, religion, national origin, sex, age or disability in any activities leading up to or in performance of this Agreement. In addition, the Contractor agrees to comply with applicable federal implementing regulations and other implementing requirements that FRA may issue.

9.2 Equal Employment Opportunity: The following equal employment opportunity requirements apply to this Agreement:

9.2.1 Race, Color, Religion, National Origin, Sex: In accordance with Title VII of the Civil Rights Act, as amended, 42 U.S.C. section 2000e, the Contractor agrees to comply with all applicable equal opportunity requirements of U.S. Department of Labor (U.S. DOL) regulations, “Office of Federal Contract Compliance Programs, Equal Employment Opportunity, Department of Labor,” including 41 C.F.R 60 et seq. (which implements Executive Order No. 1 124 6, “Equal Employment Opportunity,” as amended by Executive Order No. 11 375, “Amending Executive Order 1 1246 Relating to Equal Employment Opportunity,” 42 U.S.C. section 2000e note), and with any applicable federal statutes, executive orders, regulations, and federal policies that may in the future affect construction activities undertaken in the course of the Project. The Contractor agrees to take affirmative action to ensure that applicants are employed, and that employees are treated during employment, without regard to their race, color, religion, national origin, sex, or age. Such action shall include the following:
employment, upgrading, demotion or transfer, recruitment or recruitment advertising, layoff or termination; rates of pay or other forms of compensation; and selection for training, including apprenticeship. In addition, the Contractor agrees to comply with any implementing requirements FRA may issue.

9.2.2 Age: In accordance with section 4 of the Age Discrimination in Employment Act of 196 7, as amended, 29 U.S.C. section 623, the Contractor agrees to refrain from discrimination against present and prospective employees for reason of age. In addition, the Contractor City of Wasco – Ownership and Maintenance Agreement
HSR 2x-xx

Page 6 of 21 ends

Appendix E: Federal Terms And Conditions

agrees to comply with any implementing requirements FRA may issue.

9.2.3 Disabilities: In accordance with section 1 02 of the Americans with Disabilities Act, as amended, 42 U.S.C. section 1 211 2, the Contractor agrees that it will comply with the requirements of U.S. Equal Employment Opportunity Commission, “Regulations to Implement the Equal Employment Provisions of the Americans with Disabilities Act,” 29 C.F.R Part 163 0, pertaining to employment of persons with disabilities. Further, in accordance with section 504 of the Rehabilitation Act of 19 73, as amended, 29 U.S.C. section 794, the Contractor also agrees that it will comply with the requirements of U.S.

Department of Transportation, “Nondiscrimination on the Basis of Disability in Programs or Activities Receiving Federal Financial Assistance,” 49 C.F.R. Part 27, pertaining to persons with disabilities.

In addition, the Contractor agrees to comply with any implementing requirements FRA may issue.

9.3 The Contractor also agrees not to discriminate on the basis of drug abuse, in accordance with the Drug Abuse Office and Treatment Act of 1972 (P.L. 92- 255), as amended, alcohol abuse, in accordance with the Comprehensive Alcohol Abuse and Alcoholism Prevention, Treatment and Rehabilitation Act of 1970 (P.L. 91-616) , as amended, and to comply with sections 523 and 527 of the Public Health Service Act of 19 12 (42 U.S.C. section 290 dd), as amended, relating to confidentiality of alcohol and drug abuse patient records. In addition, the Contractor agrees to comply with applicable federal implementing regulations and other implementing requirements that FRA may issue.

9.4 The Contractor also agrees to include these requirements in each subcontract financed in whole or in part with federal assistance provided by FRA, modified only if necessary to identify the affected parties.

10. ARRA FUNDED PROJECT
Funding for this Agreement has been provided through the America Recovery and Reinvestment Act (ARRA) of 2009, Pub. L. 111-5. All Contractors, including both prime and Subcontractors, are subject to audit by appropriate federal or State of California (State) entities. The State has the right to cancel, terminate, or suspend the Agreement if any Contractor or Subcontractor fails to comply with the reporting and operational requirements contained herein.

11. ENFORCEABILITY
Contractor agrees that if the Contractor or one of its Subcontractors fails to comply with all applicable federal and State requirements governing the use of ARRA funds, the State may withhold or suspend, in whole or in part, funds awarded under the City of Wasco – Ownership and Maintenance Agreement
HSR 2x-xx

Page 7 of 21 ends

Appendix E: Federal Terms And Conditions

program, or recover misspent funds allowing an audit. This provision is in addition to all other remedies available to the State under all applicable State and federal laws.

12. PROHIBITION ON USE OF ARRA FUNDS
Contractor agrees in accordance with ARRA, section 1604, that none of the funds made available under this Agreement may be used for any casino or other gambling establishment, aquarium, zoo, golf course, or swimming pool.

13. REQUIRED USE OF AMERICAN IRON, STEEL AND OTHER MANUFACTURED GOODS
The Contractor agrees that in accordance with the Passenger Rail Investment and Improvement Act (PRIIA) of 2008, 49 C.F.R. section 24405(a), which provides that federal funds may not be obligated unless steel, iron, and manufactured products used in FRA-funded projects are produced in the United States, unless a waiver has been granted by the U.S. Secretary of Transportation. For more information on the FRA’s Buy America requirements and processes please see FRA’s Answers to Frequently Ask Questions (FAQ) available at, www.fra.dot.gov/Page/P0391.

Should the Contractor fail to demonstrate compliance with 49 U.S.C. section 24405(a) and a waiver has not been granted, the Contractor must take the necessary steps in order to achieve compliance, at no cost to the Authority. The Contractor’s failure to comply with this provision shall be a material breach of this Agreement.

If evidence indicates noncompliance with Buy America requirements, the Authority will initiate an investigation. The FRA may also initiate its own investigation. The Contractor shall have the burden of proof to establish compliance. If the Contractor fails to demonstrate compliance, then the Contractor shall substitute sufficient domestic materials without revision of the Agreement terms. Failure to comply with the provisions of this clause may lead to the initiation of debarment proceedings pursuant to 49 C.F.R. Part 29.

Where the Contractor is unable to certify that it will meet the Buy America requirements and believes it may qualify, pursuant to 49 U.S.C. section 24405(a)(2) for a waiver from the Buy America requirements set forth therein, the Contractor must submit to the Authority a written justification detailing the reasons it believes it meets the particular waiver exception(s). At a minimum, the Contractor’s written waiver request justification shall contain:

1. A description of the project;

2. A description of the steel, iron, or manufactured goods not meeting the Buy America requirement;

3. A description of the percentage of U.S. content in the steel, iron or manufactured goods, as applicable;
City of Wasco – Ownership and Maintenance Agreement
HSR 2x-xx

Page 8 of 21 ends

Appendix E: Federal Terms And Conditions

4. A description of the efforts made to secure the Buy America compliant steel, iron or manufactured goods;

5. A description of the bidding process used in the procurement (e.g., whether open or closed, how many bids were received, were any compliant products offered in competing bids);

6. If a waiver request is based on price, cost differential(s) that would be incurred in order to secure compliant Buy American steel, iron or manufactured goods;

7. Citation to specific waiver categories in 49 U.S.C. section 24405(a)(2) under which the waiver is sought;

8. Justification supporting the application of the waiver categories cited; and,

9. Contact information for the responsible party.

14. ACCESS AND INSPECTION OF RECORDS
14 .1 In accordance with ARRA sections 902, 1514 , and 1 515 , the Contractor agrees that it shall permit the State of California, the United States Comptroller General, the United States Department of Transportation Secretary, or their representatives or the appropriate Inspector General appointed under section 3 or 8G of the United States Inspector General Act of 1 978 or his representative to:
a. Access and reproduce any books, documents, papers and records of the Contractor that directly pertain to, and involve transactions relating to, this Agreement for the purposes of making audits, examinations, excerpts and transcriptions; and,
b. Interview any officer or employee of the Contractor or any of its Subcontractors regarding the activities funded with funds appropriated or otherwise made available by ARRA.
14 .2 Pursuant to 49 C.F.R. section 18 .26(i)(11 ), 49 C.F.R. section 1 9.26, or A-13 3 (whichever applicable), the Contractor agrees to maintain all books, records, accounts and reports required under this Agreement for a period of not less than three years after the date of termination or expiration of this Agreement, except in the event of litigation or settlement of claims arising from the performance of this Agreement, in which case the Contractor agrees to maintain same until the Authority, the FRA Administrator, the Comptroller General, or any of their duly authorized representatives, have disposed of all such litigation, appeals, claims, or exceptions related thereto. The Contractor shall notify the Authority not less than six months prior to disposal of any books, records, accounts and reports required under this Agreement.

City of Wasco – Ownership and Maintenance Agreement
HSR 2x-xx

Page 9 of 21 ends

Appendix E: Federal Terms And Conditions

14 .3 The Contractor agrees to comply with, and assures the compliance of its employees with, the information restrictions and other applicable requirements of the Privacy Act of 19 74, 5 U.S.C. section 552(a).

The Contractor shall include this provision in all lower-tier subcontracts.

15. WHISTLEBLOWER PROTECTION
The Contractor agrees that both it and its Subcontractors shall comply with section 1553 of the ARRA, which prohibits all non-federal contractors, including the state, and all contractors of the State, from discharging, demoting or otherwise discriminating against an employee for disclosures by the employee that the employee reasonably believes are evidence of:

1. Gross mismanagement of a contract relating to ARRA funds;

2. Gross waste of ARRA funds;

3. A substantial and specific danger to the public health or safety related to the implementation or use of ARRA funds;

4. An abuse of authority related to implementation or use of ARRA funds; or

5. A violation of law, rule, or regulation related to an agency contract (including the competition for or negotiation of a contractor) awarded or issued relating to ARRA funds.

The Contractor agrees that it and its Subcontractors shall post notice of the rights and remedies available to employees under section 1553 of Title XV of Division A of the ARRA.

16. FRAUD AND FALSE CLAIMS ACT
The Contractor acknowledges that the provisions of the Program Fraud Civil Remedies Act of 1986 (6 C.F.R. Part 13), as amended, 31 U.S.C. section 3801 et seq., and the U.S. DOT regulations Program Fraud Civil Remedies (49 C.F.R. Part 31), apply to its actions pertaining to this Project. Upon execution of this Agreement, the Contractor certifies or affirms the truthfulness and accuracy of any statement it has made, it makes, it may make, or causes to be made, pertaining to this Agreement or the FRA assisted project, for which Work is being performed under this Agreement. In addition to other penalties that may be applicable, the Contractor further acknowledges that if it makes or causes to be made, a false, fictitious or fraudulent claim, statement, submission, or certification, the Federal Government reserves the right to impose the penalties of the Program Fraud Civil Remedies Act of 1986 as cited above on the Contractor to the extent the Federal Government deems appropriate.

City of Wasco – Ownership and Maintenance Agreement
HSR 2x-xx

Page 10 of 21 ends

Appendix E: Federal Terms And Conditions

The Contractor also acknowledges that if it makes, or causes to be made, a false, fictitious, or fraudulent claim, statement, submission, or certification to the federal government under a contract connected with a project that is financed in whole or in part with Federal assistance originally awarded by the FRA, the federal government reserves the right to impose the penalties of 18 U.S.C. section 1001 or any other applicable law on the Contractor, to the extent the federal government deems appropriate.

The Contractor agrees that it shall promptly notify the Authority and shall refer to an appropriate federal inspector general any credible evidence that a principal, employee, agent, Subcontractor, or other person has committed a false claim under the False Claims Act or has committed a criminal or civil violation of laws pertaining to fraud, conflict of interest, bribery, gratuity, or similar misconduct involving ARRA funds.

The Contractor agrees to include the above paragraphs in each subcontract financed in whole or in part with Federal assistance provided by the FRA. It is further agreed that the paragraphs shall not be modified, except to identify the Subcontractor who will be subject to the provisions.

17. CARGO PREFERENCE
As required by 46 C.F.R. Part 381, the Contractor agrees to the following:

17.1 To use privately owned United States-flag commercial vessels to ship at least 50 percent of the gross tonnage (computed separately for dry bulk carriers, dry cargo liners, and tankers) involved, whenever shipping any equipment, materials, or commodities pursuant to this Agreement, to the extent such vessels are available at fair and reasonable rates for United States-flag commercial vessels.

17.2 To furnish within 20 Working Days following the date of loading for shipments originating within the United States, or within 30 Working Days following the date of loading for shipments originating outside the United States, a legible copy of a rated, “on-board” commercial ocean bill-of-lading in English for each shipment of cargo described in Part A of this section. This bill-of-lading shall be furnished to the Authority (through the Contractor in the case of a Subcontractor’s bill-of-lading) and to the Division of National Cargo and Domestic Trade, Maritime Administration, 1 200 New Jersey Ave SE, Washington, D.C. 20590, marked with appropriate identification of the Project.

17.3 To include these requirements in all subcontracts issued pursuant to this Agreement when the subcontract may involve the transport of equipment, material, or commodities by ocean vessel.

City of Wasco – Ownership and Maintenance Agreement
HSR 2x-xx

Page 11 of 21 ends

Appendix E: Federal Terms And Conditions

18. WAGE RATE REQUIREMENTS
Payment of prevailing wages on the Project is required by 49 U.S.C. section 24405(c) (2) and ARRA section 1606. For Project components that use or would use rights-of-way owned by a railroad, the Contractor shall comply with the Provisions of 49 U.S.C. section 24312. For these purposes, wages in collective bargaining agreements negotiated under the Railway Labor Act (45 U.S.C. section 151, et seq.) are deemed to comply with Davis-Bacon Act requirements. For Project components that do not use or would not use rights-of-way owned by a railroad, the Contractor shall comply with the provisions of 40 U.S.C sections 3141, et seq. The Contractor shall also comply with the Copeland “Anti-Kickback” Act provisions of 18 U.S.C. section 874 and 29 C.F.R. Part 3.

When prevailing wage rates apply, the Contractor must submit, with each invoice, a certified copy of the payroll for compliance verification. Invoice payment will not be made until the payroll has been verified and the invoice approved by the Contract Manager.

1. If there is any conflict between the state prevailing wages, the federal prevailing wages and the Authority’s Community Benefits Agreement, the highest rate shall be paid.

2. Any sub-agreement entered into as a result of this Agreement shall contain all of the provisions of this clause.

Pursuant to ARRA section 1606, the Contractor shall comply with the Davis-Bacon Act prevailing wage provisions of 40 U.S.C. sections 3141, et seq. The Contractor shall also comply with the Copeland “Anti-Kickback” Act provisions of 18 U.S.C. section 874 and 29 C.F.R. Part 3. When prevailing wage rates apply, the Contractor must submit, with each invoice, a certified copy of the payroll for compliance verification. Invoice payment will not be made until the payroll has been verified and the invoice approved by the Contract Manager.

3. If there is any conflict between the state prevailing wages and the federal prevailing wages, the higher rate shall be paid.

4. Any sub-agreement entered into as a result of this Agreement shall contain all of the provisions of this clause.

19. SEISMIC SAFETY
The Contractor agrees that any new building or addition to an existing building will be designed and constructed in accordance with the standards for Seismic Safety required in the Department of Transportation Seismic Safety Regulations, 49 C.F.R.

Part 41, and will certify to compliance to the extent required by the regulation. The Contractor also agrees to ensure that all Work performed under this Agreement including work performed by a Subcontractor is in compliance with the standards City of Wasco – Ownership and Maintenance Agreement
HSR 2x-xx

Page 12 of 21 ends

Appendix E: Federal Terms And Conditions

required by the Seismic Safety Regulations and the certification of compliance issued on the Project.

20. REPORTING REQUIREMENTS
Contractor agrees, if requested by the Authority in writing, to provide the Authority with the following information:

20.1 The total amount of funds received by the Contractor during the time period defined in the Authority’s request;

20.2 The amount of funds actually expended or obligated during the time period requested;

20.3 A detailed list of all projects or activities for which funds were expended or obligated, including:

1. The name of the project or activity;

2. A description of the project activity;

3. An evaluation of the completion status of the project or activity; and,

4. An estimate of the number of jobs created and/or retained by the project or activity.

20.4 For any contracts or subcontracts equal to or greater than $25,000:

1. The name of the entity receiving the contract;

2. The amount of the contract;

3. The transaction type;

4. The North American Industry Classification System (NAICS) code or Catalog of Federal Domestic Assistance (CFDA) number, if known;

5. The location of the entity receiving the contract;

6. The primary location of the contract, including city, state, congressional district, and county;

7. The DUNS number, or name and zip code for the entity headquarters, if known;

8. A unique identifier of the entity receiving the Agreement and the parent entity of Contractor, should the entity be owned by another; and, City of Wasco – Ownership and Maintenance Agreement
HSR 2x-xx

Page 13 of 21 ends

Appendix E: Federal Terms And Conditions

9. The names and total compensation of the five most highly compensated officers of the company if received:
a. 80% or more of its annual gross revenues in Federal awards; b. $25,000,000 or more in annual gross revenue from Federal awards; and,
c. If the public does not have access to information about the compensation of senior executives through periodic reports filed under section 13 (a) or 15 (d) of the Securities Exchange Act of 1 934 or section 610 4 of Internal Revenue Code of 19 86.

20.5 Any other information reasonably requested by the State of California or required by state or federal law or regulation.

Standard data elements and federal instruction for use in complying with reporting requirements under section 1512 of the ARRA, are pending review by the federal government, and were published in the Federal Register on April 1, 2009 [74 FR 14824], and are to be provided online at www.FederalRegister.gov. The additional requirements will be added to this Agreement by amendment.

21. REPRINTS OF PUBLICATIONS
Whenever an employee of a Contractor-Related Entity writes an article regarding the Project or otherwise resulting from work under this Agreement that is published in a scientific, technical, or professional journal or publication, the Contractor shall ensure that the Authority is sent two reprints of the publication, clearly referenced with the appropriate identifying information.

An acknowledgment of FRA support and a disclaimer must appear in any publication, whether copyrighted or not, based on or developed under the Agreement, in the following terms:
“This material is based upon work supported by the Federal Railroad Administration under a grant/cooperative agreement FR-HSR-0009-10-01-05, dated December 5, 2012. Any opinions, findings, and conclusions or recommendations expressed in this publication are those of the author(s) and do not necessarily reflect the view of the Federal Railroad Administration and/or U.S. DOT.”

22. LABOR PROVISIONS
49 U.S.C. 24405(b) provides that persons conducting rail operations over rail infrastructure constructed or improved in whole or in part with funds provided through this Agreement shall be considered a “rail carrier,” as defined by 49 U.S.C. 10102(5), for the purposes of Title 49, U.S.C., and any other statue that adopts that definition or in which that definition applies, including the Railroad Retirement Act of City of Wasco – Ownership and Maintenance Agreement
HSR 2x-xx

Page 14 of 21 ends

Appendix E: Federal Terms And Conditions

1974 (45 U.S.C. 231 et seq.), the Railway Labor Act (43 U.S.C. 151 et seq.), and the Railroad Unemployment Insurance Act (45 U.S.C. 351 et seq.) To the extent required by 49 U.S.C. 24405(b) and other laws referenced above, the Contractor shall reflect these provisions in its agreements funded in whole or in part by this Agreement with entities operating rail services over such rail infrastructure.

23. LABOR PROTECTIVE ARRANGEMENTS
The Contractor agrees to comply with the applicable protective arrangements established under section 504 of the Railroad Revitalization and Regulatory Reform Act of 1976 (4R Act), 45 U.S.C. 836 with respect to employees affected by actions taken in connection with the Project. The Contractor also agrees to include the applicable protective arrangements established by the U.S. DOL under 45 U.S.C. 836 in its arrangements with entities operating rail services over rail infrastructure constructed as part of this Agreement.

24. PROPERTY, EQUIPMENT AND SUPPLIES

24.1 The Contractor agrees that Project property, equipment, and supplies shall be used for the Project activity for the duration of its useful life, as determined by the FRA. Should the Contractor unreasonably delay or fail to use Project property, equipment, or supplies during its useful life, the Contractor agrees that the FRA may require the Contractor to return the entire amount of FRA assistance expended on that property, equipment, or supplies. The Contractor further agrees to notify the Authority when any Project property or equipment is withdrawn from use in the Project activity or when such property or equipment is used in a manner substantially different from the representations made by the Contractor in its justification for purchase of the property or equipment.

24.2 The Contractor agrees to comply with the property standards of 49 C.F.R. sections 18 .31, 18 .32, and 18.33, including any amendments thereto, and other applicable guidelines or regulations that are issued.

24.3 The Contractor agrees to maintain the Project property and equipment in good operating order, and in accordance with any guidelines, directives, or regulations that the FRA may issue.

24.4 The Contractor agrees to keep satisfactory records with regard to the use of the property, equipment, and supplies, and submit to the FRA, upon request, such information as may be required to assure compliance with this section.

24.5 The Contractor agrees that the FRA may:

1. Require the Contractor to transfer title to any property, equipment, or supplies financed with FRA assistance, as permitted by 49 C.F.R. section 18 .32(g).

City of Wasco – Ownership and Maintenance Agreement
HSR 2x-xx

Page 15 of 21 ends

Appendix E: Federal Terms And Conditions

2. Direct the disposition of property or equipment financed with FRA assistance as set forth by 49 C.F.R. sections 1 8.31 and 1 8.32.

24.6 Unless expressly authorized in writing by the Authority, the Contractor agrees to refrain from:

1. Executing any transfer of title, lease, lien, pledge, mortgage, encumbrance, contract, grant anticipation note, alienation, or other obligation that in any way would affect the Authority’s or the FRA’s interest in any Property or equipment; or obligating itself in any manner to any third party with respect to Project property or equipment.

24.7 The Contractor agrees that Project property, equipment, and supplies shall be used for the Project activity for the duration of its useful life, as determined by the FRA. Should the Contractor unreasonably delay or fail to use Project property, equipment, or supplies during its useful life, the Contractor agrees that the FRA may require the Contractor to return the entire amount of FRA assistance expended on that property, equipment, or supplies. The Contractor further agrees to notify the Authority when any Project property or equipment is withdrawn from use in the Project activity or when such property or equipment is used in a manner substantially different from the representations made by the Contractor in its justification for purchase of the property or equipment.

24.8 The Contractor agrees to comply with the property standards of 49 C.F.R. sections 19. 30 through 19. 37 inclusive, including any amendments thereto, and other applicable guidelines or regulations that are issued.

24.9 The Contractor agrees to maintain the Project property and equipment in good operating order, and in accordance with any guidelines, directives, or regulations that the FRA may issue.

24.1 0 The Contractor agrees to keep satisfactory records with regard to the use of the property, equipment, and supplies, and submit to the FRA, upon request, such information as may be required to assure compliance with this section.

24.1 1 The Contractor agrees that the FRA may:

1. Require the Contractor to transfer title to any property, equipment, or supplies financed with FRA assistance, as permitted by 49 C.F.R. sections

19. 30 through 19. 37 inclusive.

2. Direct the disposition of property or equipment financed with FRA assistance as set forth by 49 C.F.R. sections 1 9.30 through 1 9.37 inclusive.

24.1 2 Unless expressly authorized in writing by the Authority, the Contractor agrees to refrain from:

City of Wasco – Ownership and Maintenance Agreement
HSR 2x-xx

Page 16 of 21 ends

Appendix E: Federal Terms And Conditions

1. Executing any transfer of title, lease, lien, pledge, mortgage, encumbrance, contract, grant anticipation note, alienation, or other obligation that in any way would affect the Authority’s or the FRA’s interest in any Property or equipment; or

2. Obligating itself in any manner to any third party with respect to Project property or equipment.

The Contractor agrees to refrain from taking any action or acting in a manner that would adversely affect the FRA’s interest or impair the Authority’s continuing control over the use of Project property or equipment.

The Contractor must comply with the property, equipment, and supplies management standards and procedures in 49 C.F.R. sections 18.31 and 18.32. The Contractor may use its own management standards so long as such standards comply with 49 C.F.R. sections 18.31 and 18.32.

The Contractor must comply with the property, equipment and supplies management standards and procedures in 49 C.F.R. sections 19.30 through 19.37, inclusive. The Contractor may use its own management standards so long as such standards comply with 49 C.F.R. sections 19.30 through 19.37, inclusive.

25. MAINTENANCE
If any Project property, equipment, or supplies are not used for the Project for the duration of its useful life, as determined by the FRA, whether by planned withdrawal, misuse or casualty loss, the Contractor agrees to notify the Authority immediately.

Disposition of withdrawn property, equipment, or supplies shall be in accordance with 49 C.F.R. sections 18.31 and 18.32.

If any Project property, equipment, or supplies are not used for the Project for the duration of its useful life, as determined by the FRA, whether by planned withdrawal, misuse or casualty loss, the Contractor agrees to notify the Authority immediately.

Disposition of withdrawn property, equipment, or supplies shall be in accordance with 49 C.F.R. sections 19.30 through 19.37 inclusive.

26. FLY AMERICA
The Contractor agrees to comply with 49 U.S.C. section 40118 (the “Fly America” Act) in accordance with the General Services Administration’s regulations at 41 C.F.R. Part 301-10, which provide that recipients and sub-recipients of Federal funds and their contractors are required to use U.S. flag air carriers for U.S.

Government-financed international air travel and transportation of their personal effects or property, to the extent such service is available, unless travel by foreign air carrier is a matter of necessity, as defined by the Fly America Act. If a foreign air carrier was used, the Contractor shall submit an appropriate certification or memorandum adequately explaining why service by a U.S. flag carrier was not available or why it was necessary to use a foreign air carrier, and shall, in any event, City of Wasco – Ownership and Maintenance Agreement
HSR 2x-xx

Page 17 of 21 ends

Appendix E: Federal Terms And Conditions

provide a certificate of compliance with the Fly America requirements. The Contractor agrees to include the requirements of this section in all subcontracts that may involve international air transportation.

No travel is authorized under this Agreement.

No international travel is authorized under this Agreement.

27. RECYCLING CERTIFICATION
The Contractor shall comply with all applicable requirements of section 6002 of the Resource Conservation and Recovery Act (RCRA), as amended (42 U.S.C. section 6962), including the regulatory provisions of 40 C.F.R. Part 247, and Executive Order 12873, as they apply to the procurement of the items designated in Subpart B of 40 C.F.R. Part 247.

28. SMALL BUSINESS/DISADVANTAGED BUSINESS ENTERPRISES
The Authority encourages the Contractor to utilize small business concerns owned and controlled by socially and economically disadvantaged individuals, also known as Disadvantaged Business Enterprises (DBE), in carrying out the Agreement. The Authority has established a Revised Small and Disadvantaged Business Enterprise (SB/DBE) Program for Professional Services Contracts, and an overall 30 percent goal for small business utilization, to include within the 30 percent goal, a ten percent goal for DBE and 3 percent Disabled Veteran Business Enterprise (DVBE) in the Authority’s contracting and procurement program. The SB/DBE Program is in compliance with the Best Practices of 49 C.F.R. Part 26, Executive Order S-02-06, Military and Veterans Code 999 and Title VI of the Civil Rights Act of 1964 and related statutes.

The Authority has established a 30 percent Small Business (SB) goal as described above. The Contractor is expected to make efforts to meet the goal and provide a SB Performance Plan on how the goal will be met throughout the duration of this Agreement. For more detailed information regarding what components should be in the SB Performance Plan see the Revised SB/DBE Program for Professional Services Contracts. The Authority’s SB/DBE Program requirements, including the SB Performance Plan expectations, SB utilization reporting, Substitution/Termination processes, Prompt Payment Provisions, Recognized SB Roster of Certifying Agencies, and other performance related factors, are included in the Authority’s Revised Small and Disadvantaged Business Enterprise Program for Professional Services Contracts – August 2012. The document is on the Authority’s Small Business web page:
www.hsr.ca.gov/business-opportunities/small-business-program/ The Contractor shall also comply with 41 C.F.R. Part 60, Best Practices of 49 C.F.R.

Part 26, Executive Order 11246 and Title VI of the Civil Rights Act of 1964 and related statutes.

City of Wasco – Ownership and Maintenance Agreement
HSR 2x-xx

Page 18 of 21 ends

Appendix E: Federal Terms And Conditions

29. EXISTING INTERCITY RAIL
49 U.S.C. section 24405(d) requires any entity providing intercity passenger railroad transportation on an FRA-funded project to comply with certain requirements with respect to its employees and the employees of preexisting intercity rail passenger services. The Contractor shall comply with the applicable provision of 49 U.S.C. section 24405(d) to the extent it is or becomes a provider of intercity passenger railroad transportation. If it is not the operator or provider of the intercity passenger rail services benefitting from the Project funded under this Agreement, then it shall notify its selected operator of the requirements imposed by section 24405(d).

30. FLOOD HAZARDS
The Contractor agrees to comply with the flood insurance purchase requirements of section 102(a) of the Flood Disaster Protection Act of 1973, 42 U.S.C. section 4012(a), with respect to any construction or acquisition Project.

31. PATENT RIGHTS

31. 1 If any invention, improvement, or discovery of the Contractor or any of its third party contractors is conceived or first actually reduced to practice in the course of or under this Project, and that invention, improvement, or discovery is patentable under the laws of the United States of America or any foreign country, the Contractor agrees to notify the Authority immediately and provide a detailed report. The rights and responsibilities of the FRA, third party contractors and the Authority with respect to such invention, improvement, or discovery will be determined in accordance with applicable Federal laws, regulations, policies, and any waiver thereof.

31. 2 If the Contractor secures a patent with respect to any invention, improvement, or discovery of the Contractor or any of its third party contractors conceived or first actually reduced to practice in the course of or under this Project, the Contractor agrees to grant the FRA a royalty-free, non-exclusive, and irrevocable license to use and authorize others to use the patented device or process for Federal Government purposes.

31. 3 The Contractor agrees to include the requirements of the “Patent Rights” section of this Agreement in its third party contracts for planning, research, development, or demonstration under this Project.

31. 4 “Proprietary data” is data that the Contractor has identified in a satisfactory manner as being under the Contractor’s control prior to commencement of performance of this Agreement, and that the Contractor has reasonably demonstrated as being of a proprietary nature by reason of copyright, patent, or trade secret doctrines in full force and effect at the time when performance of this Agreement is commenced. The title to “proprietary data” shall remain with the Contractor throughout the term of this Agreement and thereafter.

City of Wasco – Ownership and Maintenance Agreement
HSR 2x-xx

Page 19 of 21 ends

Appendix E: Federal Terms And Conditions

31. 5 “Generated data” is data that the Contractor has collected, collated, recorded, deduced, read out, or postulated for utilization in the performance of this Agreement. “Generated data,” as defined herein, shall not include data developed solely from preexisting or proprietary data owned by the Contractor prior to the execution of this Agreement. Any electronic data processing program, model, or software system developed or substantially modified by the Contractor in the performance of this Agreement at the Authority’s expense, together with complete documentation thereof, shall be treated in the same manner as “generated data.” “Generated data” shall by the property of the Authority, unless and only to the extent that it is specifically provided otherwise in this Agreement.

32. RIGHTS IN DATA AND COPYRIGHT

32.1 The term “subject data” used in this section means recorded information, whether or not copyrighted, that is developed, delivered, or specified to be delivered under this Agreement. The term includes, but it not limited to, graphic or pictorial delineations in media such as drawings or photographs; text in specifications or related performance or design-type documents; machine forms such as punched cards, magnetic tape, or computer memory printouts; and information retained in computer memory. The term does not include financial reports, cost analyses, and similar information incidental to Project administration.

32.2 The following restrictions apply to all subject data first produced in the performance of this Agreement:

1. Except for its own internal use, the Contractor may not publish or reproduce such data in whole or in part, or in any manner or form, nor may the Contractor authorize others to do so, without the written consent of the FRA.

2. As authorized by 49 C.F.R. section 1 8.34, or 49 C.F.R. section 1 9.36, as applicable, the FRA reserves a royalty-free, non-exclusive and irrevocable license to reproduce, publish, or otherwise use, and to authorize others to use, for federal government purposes:
a. Any work developed under a grant, cooperative agreement, sub-grant, sub-agreement, or other third party contract, irrespective of whether or not a copyright has been obtained; and,
b. Any rights of copyright to which a Grantee, subgrantee, or a third party contractor purchases ownership with federal assistance.

32.3 The FRA may make available to any FRA Grantee, subgrantee, third party contractor, or third party subcontractor, either the FRA’s license in the copyright to the “subject data” derived under this Agreement or a copy of the “subject data” first produced under this Agreement. In the event that such a City of Wasco – Ownership and Maintenance Agreement
HSR 2x-xx

Page 20 of 21 ends

Appendix E: Federal Terms And Conditions

Project which is the subject of this Agreement is not completed, for any reason whatsoever, all data developed under that Project shall become subject data as defined herein and shall be delivered as the FRA may direct.

32.4 To the extent permitted by State law, the Contractor agrees to indemnify, save and hold harmless the FRA, its officers, agents, and employees acting within the scope of their official duties against any liability, including costs and expenses, resulting from any willful or intentional violation by the Contractor of proprietary rights, copyrights, or right of privacy, arising out of the publication, translation, reproduction, delivery, use or disposition of any data furnished under this Agreement. The Contractor shall not be required to indemnify the FRA for any such liability arising out of the wrongful acts of employees or agents of the FRA.

32.5 The Contractor agrees to include the requirements of this section in its lower- tier subcontracts for planning, research, development, or demonstration under the Project.

33. SIGNAGE
The Contractor is strongly encouraged to post a sign at all fixed project locations at the most publicly accessible location and a plaque in all purchased or rehabilitated rail cars announcing that the project or equipment was funded by the U.S. Department of Transportation, Federal Railroad Administration, with funds provided through the American Recovery and Reinvestment Act. The configuration of the signs or plaques will be consistent with guidance issued by the Office of Management and Budget and/or the Department of Transportation and approved by the FRA.

34. PROHIBITION OF TRAFFICKING IN PERSONS
The Contractor agrees that during the term of this Agreement, in accordance with section 106(g) of the Trafficking Victims Protection Act of 2000, as amended (22 U.S.C. section 7104(g)), the Contractor and its employees, and its Subcontractors (of any tier), and all of their employees, shall not engage in severe forms of trafficking in persons, procure a commercial sex act, or use forced labor in the performance of this Agreement.

This provision must be included in all Subcontract agreements.

35. PROHIBITION OF TEXT MESSAGING WHILE DRIVING
The Contractor agrees to adopt and enforce workplace safety policies to decrease crashes caused by distracted drivers, including policies that bar text messaging while driving company-owned, leased, or rented vehicles or privately-owned vehicles when performing work under this Agreement. See Executive Order 13513 “Federal Leadership on Reducing Text Messaging While Driving,” Oct. 1, 2009 (available at http://www.gpo.gov/fdsys/pkg/FR-2009-10-06/pdf/E9-24203.pdf) and DOT 3902.10 “Text Messaging While Driving,” Dec. 30, 2009, as implemented by Financial Assistance City of Wasco – Ownership and Maintenance Agreement
HSR 2x-xx

Page 21 of 21 ends

Appendix E: Federal Terms And Conditions

Policy Letter (No. FAP-2019-01, Feb. 2, 2010, available at http://www.dot.gov/sites/dot.dev/files/docs/FAPL_2010-01.pdf.

Right of Way Transfer Agreement

Page 1 of 6 ends

This a greement (Agreement) is made and entered into by and between the State of California, acting by and through the California High-Speed Rail Authority (Authority), and the City of Wasco (City), a California municipal corporation, whose principal mailing address is 746 8th Street, Wasco, California 93280. The City and the Authority are hereinafter referred to individually as a “Party” and collectively as the “Parties.”

RECITALS
WHEREAS, the Authority is currently engaged in a program that has various projects under current provisions of Streets and Highway Code section 2704.04 and Public Utilities Code section 185000 et seq. throughout the State of California identified as the California High-Speed Rail Project (Project); WHEREAS, the Authority requires City roads for state high-speed rail system purposes, and for public use in accordance with Public Utilities Code section 185000 et seq., and is authorized to acquire the property pursuant to Public Utilities Code section 185036; WHEREAS, the Project requires the Relocation, construction, and/or removal of certain city roads located within the City (City Roads);
WHEREAS, the Authority is authorized to transfer or exchange property pursuant to Public Utilities Code section 185040 et seq.;
WHEREAS, the Authority is responsible for the relocation of City Roads that are in conflict with the design or construction of the Project, including the execution and funding of any required Relocation; and
WHEREAS, the Parties desire to enter into an agreement which establishes the contractual terms and conditions applicable to the transfer and/or exchange of property among the Parties due to the Project.

ACCORDINGLY, the Parties hereby agree as follows:

1. Capitalized terms used but not identified in this Agreement shall have the definitions set forth in the Cooperative Agreement (HSR 15-106) entered into by and between the City and the Authority (Cooperative Agreement). All Facility Work shall be performed in accordance with the requirements of the Cooperative Agreement, and in the event of any inconsistency between the provisions of this Agreement and the Cooperative Agreement, the provisions of the Cooperative Agreement shall prevail.

2. By this Agreement, the Parties agree and consent to the transfers of right-of-way, as delineated in Exhibit A attached hereto and incorporated by such reference, which transfer shall be at no cost to any Party for the value of the property so transferred.
a. Exhibit A (Existing Fee), identified in red. Existing property right(s) held by the City (Right-of-Way of City) owned in fee to be conveyed to the Authority that has been determined to be necessary for the Authority to construct the Project. b. Exhibit A (Existing Fee -County Reserves Road Rights), identified in white with red

Right of Way Transfer Agreement

Page 2 of 6 ends

border. Existing Right-of-Way of City owned in fee to be conveyed to the Authority that has been determined to be necessary for the Authority to construct the Project on which the City reserves an easement for road rights.
c. Exhibit A (Replacement Fee Right-of-Way), identified in green. Replacement right- of-way to be acquired by the Authority and conveyed to the City in fee for relocated City roads, alleys, or other related facilities.
d. Exhibit A (Replacement Right-of-Way for Road Rights Only), identified in white with green border. Replacement right-of-way to be acquired by the Authority and conveyed to the City in easement for road rights only for relocated City roads, alleys, or other related facilities. e. Exhibit A (Superseded Existing Right-of-Way to Mitigate) , identified in purple.

Superseded existing Right-of-Way of City to be conveyed to the Authority that is required by the Authority to mitigate damages to adjacent properties impacted by the Project. f. Exhibit A (Superseded Existing Right-of-Way to Vacate) , identified in yellow.

Superseded existing Right-of-Way of City that is not be needed for the Project and will be vacated or disposed of by the City.
g. Exhibit A (Existing County Owned Easement ), identified in orange. Existing Right- of-Way of City owned in easement required by the Project that will be subjected to the process in Streets and Highway Code section 8320 for abandonment/vacation by the City upon request of the Authority only after the Authority’s acquisition of the underlying fee.

Exhibit A may be changed without an amendment to this Agreement, as delegated by the City Council and as authorized in conformance with the Authority’s site selections for this Agreement. Nevertheless, any changes, which shall be at no cost to either Party , shall be agreed upon in writing by authorized representatives of the Parties. By its approval of this Agreement, the City Council authorizes the Director of the City’s Department of Public Works and Planning, or her designee, to execute such written changes to Exhibit A only, on behalf of City for the purpose of reconciling Exhibit A.

3. It is understood among the Parties that the right-of-way may be required in sections or units, and that both as to the acquisition of right-of-way and the construction of the Project, the obligations of the Authority hereunder shall be carried out at such time and for such unit or units of the Project for which funds have been budgeted and made lawfully available to the Authority for such expenditures.

4. The City by execution of this Agreement hereby grants to the Authority immediate right of possession (RP) and use of the existing Right-of-Way of County shown on Exhibit A for the purpose of constructing the Project. Said RP does not relieve the Authority of its obligations to provide suitable replacement right-of-way and Facilities to City. Any closure, removal, or restriction of City Roads by the Authority will be performed in accordance with the Cooperative Agreement.

5. The Authority agrees to acquire all necessary rights-of- way as may be required for the construction, reconstruction, or alteration of City Roads. See Exhibit A (Replacement Fee Right-of-Way and Replacement Right-of-Way for Road Rights Only).

Right of Way Transfer Agreement

Page 3 of 6 ends

6. The existing Right -of-Way of City required for construction of the Project and shown on Exhibit A (Existing Fee and Existing City-Owned Easement) will, if owned in fee, be conveyed from the City to the Authority in recordable form acceptable to the Authority; if, however, the Right-of-Way of City is owned in easement, the City will be subjected to the process in Streets and Highway Code section 8320 for abandonment/vacation upon the Authority’s request and upon the Authority’s acquisition of the underlying fee.

7. The replacement County Road right-of-way acquired by the Authority and shown on Exhibit A ( Replacement Fee Right -of-Way and Replacement Right-of- Way for Road Rights Only ) shall be conveyed to the City in recordable form acceptable to the City and subject to no liens or encumbrances that would prevent the use of the property for public facilities purposes or other relevant purposes.

8. The superseded existing Right -of-Way of City that is not required for construction of the Project but is required by the Authority to mitigate damages to adjacent properties being affected by the Project and shown on Exhibit A (Superseded Existing Right-of-Way to Mitigate) shall, if owned in fee, be conveyed from the City to the Authority or the designated affected property owner, subject to all existing encumbrances; if, however, the Right-of-Way of City is owned in easement, the City will be subjected to the process in Streets and Highways Code section 8320 for abandonment/vacation of its interests as requested by the Authority.

9. The City will accept control and maintenance of City Roads as agreed to in the Ownership and Maintenance Agreement. The City will accept title to the portions of such City Roads or other City-owned facilities lying outside the Authority’s right-of-way limits, upon transfer by the Authority.

10. In accordance with the City’s policy, the City may sell or dispose of all remaining superseded existing Right -of-Way of City shown in Exhibit A (Superseded Existing Right-of-Way to Vacate) not required for Project and the net proceeds will remain with the City.

11. The City shall be solely responsible for timely performing any required road abandonment or vacation proceedings necessary for the City to comply with the terms of this Agreement. The Authority shall reimburse the City for actual costs incurred for the abandonment or vacation. Unless the City Council determines the public convenience and necessity requires otherwise, the City shall reserve and except from any road vacation an easement and right for public utility providers to construct, maintain, operate, replace, remove, and renew public utility facilities and appurtenances thereto in, upon, over, and across a road proposed to be vacated pursuant to any existing franchise agreements or renewals thereof, as set forth in Streets and Highways Code section 8340.

12. The terms and conditions of this Agreement may not be modified except with the mutual written consent of the Parties. Nevertheless, Exhibit A may also be modified in accordance with Section 2 of this Agreement.

13. Conveyance as specified in Sections 6 and 7 above shall be completed upon Substantial Completion of construction on the affected City Road. “Substantial Completion” means the stage of completion where the City Road is fit for use for its intended purpose. The City shall be invited to participate in the final walk through. Any significant deviation noted pertaining to roadway shall be corrected as a

Right of Way Transfer Agreement

Page 4 of 6 ends

condition of final acceptance by the City and any such correction will be completed before close out of the Project.

14. Conveyance of superseded Right-of-Way of City as described in Section 8 above will be completed during construction of the Project and at the request of the Authority.

15. Disposal of any remaining superseded existing Right-of-Way of City described in Section 10 above is solely at the discretion of the City.

16. The City shall perform any required road abandonment proceedings in Section 11 above in a timely manner to ensure that the City can perform as specified in Sections 13 and 14 above.

17. The Parties have herein set forth the whole of their agreement with respect to the subject matter hereof. The perf ormance of t his Agreement constitutes the ent ire consideration for the transfer of City Roads and shall relieve the Authority of all further obligation or claims based thereon, or based upon the location, grade, or construction of the proposed public improvement.

18. Once the Authority has been granted possession and use of the property pursuant to Section 4, the Authority is entitled to undertake, at the Authority’s sole expense, an inspection of City Roads; a review of the physical condition of City Roads, including but not limited to, inspection and examination of soils, environmental factors, hazardous substances, biological resources, archaeological information and water resources, if any, relating to City Roads; and a review and investigation of the effect of zoning, maps, permits, reports, engineering data, regulations, ordinances , and laws affecting City R oads, if any. The Authority shall provide the City copies of all inspection and/or examination reports obtained by the Authority pursuant to this paragraph. Such reports shall be provided immediately upon the Authority’s receipt of the same.

19. Notwithstanding other provisions in this Agreement, the Authority’s RP and use of the property including the right to remove and dispose of improvements in accordance with the terms of Section 4, shall commence upon full execution of this Agreement by the Parties. (Signature Pages Follow)

Right of Way Transfer Agreement

Page 5 of 6 ends

AGREEMENT – SIGNATURE SHEETS

IN WITNESS WHEREOF, the Parties have executed this Agreement effective the day and year last written below.

CITY OF WASCO

By: Date:
[Signor’s name]
[Title]
City of Wasco

ATTEST:

By: Date:
[Signor’s name]
[Title]
City of Wasco

(Continues)

Right of Way Transfer Agreement

Page 6 of 6 ends

STATE OF CALIFORNIA

California High-Speed Rail Authority

By: Date:

Donald A. Odell, Director of Real Property

NO OBLIGATION OTHER THAN THOSE SET FORTH HEREIN WILL BE RECOGNIZED PER PM 10135 BK47 PG47
25' EASEMENT FOR LANDSCAPE
SHEET NO.TOTAL SHEETS

DATE REVISION S BY

DATE REVISION S BY

DATE REVISION S BYDATE REVISION S BY
DWG No.

FRESNO TO BAKERSFIELD

CALIFORNIA HIGH-SPEED TRAIN PROJECT

PMCONTRACT
SURVEYO R IN CHA RGE:

NOTES
LEGEND
(R)
LEGEND
dpoulson 9/14/2022 7:27:44 AM CHSR-ROW-Appraisal.tblCHSR-ROW-PDF_half.pltY:\Jobs\21303 CHSR CP 4 Team B\MicroStation FB Maps\Agreem ent Exhibits\City of Wasco\4S-RW-T0001-CITY-Z5.dgn TO OBTAIN GROUND LEVEL DISTANCES.

MULTIPLY DISTANCES BY 1.000066514
(T)
SF
S.P.R.R.

DISTANCES.

DISTANCES AND STATIONING ARE GRID
SURVEY FEET.

EPOCH 2007.0. DISTANCES ARE U.S.

COORDINATE SYSTEM OF 1983, ZONE 4

ARE BASED ON THE CALIFORNIA

COORDINATES, BEARINGS AND DISTANCES
Southern Pacific Rail Rd
Square Feet
Total Distance
Radial Bearing
Required for Others
Title to State
Exist Property Line
Exist Easement Line
-SupersededHistoric R/W
Access Superseded
Access Prohibited
COUNTY
22CP4 KER

CITY OF WASCO

RIGHT OF WAY

TRANSFER AGREEMENT EXHIBIT
HIG HWA Y 4 3
B.N.S.F. RAILRO A D

INFLUENCE BOUNDARY
SPHERE of
CITY of WASCO
LIMITS

WASCO CITY
LIMITS

WASCO CITY
LIMITS

WASCO CITY
1 COUNTY

TO KERN
COUNTY

TO KERN
CITY OF WASCO ROW TRANSFER AGREEMENT CONSTRUCTION PACKAGE 4 - EXHIBIT A M
CC
O
M
B
S

R
D
.

M
CC
O
M
B
S

R
D
.

CITY OF WASCO
G
R
O
M
E
R

AV
E
NU
E
RW-T6601 RW-T6604
RW-T6602

COUNTY OF KERN
RW-T6607
RW-T6608 RW-T6609 RW-T6610 RW-T6611
7TH STREET
HIGHWAY 46

ANNIN AVENUE
F STRE E T (HIG HWA Y 4 3)
H
IGH
W
AY

43 WASCO A VEN UE (J STRE ET)
9TH STREET

POSO DRIVE
RW-T6612
SHEET NO.TOTAL SHEETS

DATE REVISION S BY

DATE REVISION S BY

DATE REVISION S BYDATE REVISION S BY
DWG No.

FRESNO TO BAKERSFIELD

CALIFORNIA HIGH-SPEED TRAIN PROJECT

PMCONTRACT
SURVEYO R IN CHA RGE:

NOTES
LEGEND
(R)
LEGEND
dpoulson 9/8/2022 11:05:07 AMCHSR-ROW-Appraisal.tblCHSR-ROW-PDF_half.pltY:\Jobs\21303 CHSR CP 4 Team B\MicroStation FB Maps\Agreem ent Exhibits\City of Wasco\4S-RW-T0002-CITY-Z5.dgn TO OBTAIN GROUND LEVEL DISTANCES.

MULTIPLY DISTANCES BY 1.000066514
(T)
SF
S.P.R.R.

DISTANCES.

DISTANCES AND STATIONING ARE GRID
SURVEY FEET.

EPOCH 2007.0. DISTANCES ARE U.S.

COORDINATE SYSTEM OF 1983, ZONE 4

ARE BASED ON THE CALIFORNIA

COORDINATES, BEARINGS AND DISTANCES
Southern Pacific Rail Rd
Square Feet
Total Distance
Radial Bearing
Required for Others
Title to State
Exist Property Line
Exist Easement Line
-SupersededHistoric R/W
Access Superseded
Access Prohibited
COUNTY
22CP4 KER

CITY OF WASCO

RIGHT OF WAY

TRANSFER AGREEMENT EXHIBIT

CITY OF WASCO
LIMITS

WASCO CITY
LIMITS

WASCO CITY

INFLUENCE BOUNDARY
SPHERE of
CITY of WASCO
2 CITY OF WASCO ROW TRANSFER AGREEMENT CONSTRUCTION PACKAGE 4 - EXHIBIT A

INFLUENCE BOUNDARY
SPHERE of
CITY of WASCO

POSO DRIVE
16TH STREET
F STRE E T (HIG HWA Y 4 3)
RW-T6613
RW-T6618
RW-T6614 RW-T6615

POSO DRIVE

FILBURN STREET
B.N.S.F. RAILRO A D
RW-T6616
HIG HWA Y 4 3
J
A
C
K
S
ON

AV
E

GRIF FITH A VE
P
R
O
SP
E
C
T

AV
E
DAORLIAR .F.S.N.B

EUNEVA OCSAW
K
IM
B
E
R
L
INA

AV
E
J
A
C
K
S
ON

AV
E
RW-T6703
RW-T6702RW-T6701
RW-T6700

COUNTY OF KERN
K
IM
B
E
R
L
INA

AV
E
HIG HWA Y 4 3
SHEET NO.TOTAL SHEETS

DATE REVISION S BY

DATE REVISION S BY

DATE REVISION S BYDATE REVISION S BY
DWG No.

FRESNO TO BAKERSFIELD

CALIFORNIA HIGH-SPEED TRAIN PROJECT

PMCONTRACT
SURVEYO R IN CHA RGE:

NOTES
LEGEND
(R)
LEGEND
dpoulson 9/8/2022 11:12:57 AMCHSR-ROW-Appraisal.tblCHSR-ROW-PDF_half.pltY:\Jobs\21303 CHSR CP 4 Team B\MicroStation FB Maps\Agreem ent Exhibits\City of Wasco\4S-RW-T6601-Z5.dgn TO OBTAIN GROUND LEVEL DISTANCES.

MULTIPLY DISTANCES BY 1.000066514
(T)
SF
S.P.R.R.

DISTANCES.

DISTANCES AND STATIONING ARE GRID
SURVEY FEET.

EPOCH 2007.0. DISTANCES ARE U.S.

COORDINATE SYSTEM OF 1983, ZONE 4

ARE BASED ON THE CALIFORNIA

COORDINATES, BEARINGS AND DISTANCES
Southern Pacific Rail Rd
Square Feet
Total Distance
Radial Bearing
Required for Others
Title to State
Exist Property Line
Exist Easement Line
-SupersededHistoric R/W
Access Superseded
Access Prohibited
COUNTY
22CP4 KER

CITY OF WASCO

RIGHT OF WAY

TRANSFER AGREEMENT EXHIBIT
A
S
P
H
UB
UB
RS
RS
RS

CENTRAL V AL L EY HWY
1 5 5 1 0+0 0
1 5 5 1 5+00
1 5 5 2 0+0 0
CITY OF WASCO ROW TRANSFER AGREEMENT CONSTRUCTION PACKAGE 4 - EXHIBIT A

EXISTING FEE (TRANSFER OF FEE PROPERTY FROM CITY TO STATE)

EXISTING FEE (TRANSFER OF FEE PROPERTY FROM CITY TO STATE - CITY RESERVES STREET RIGHTS)

REPLACEMENT RIGHT OF WAY (TRANSFER OF FEE PROPERTY FROM STATE TO CITY)

REPLACEMENT RIGHT OF WAY (STATE TRANSFERS CITY STREET RIGHTS ONLY)

SUPERCEDED EXISTING CITY RIGHT OF WAY TO MITIGATE (CITY VACATES PUBLIC ROW, TRANSFER OF FEE PROPERTY FROM CITY TO STATE)

SUPERCEDED EXISTING CITY RIGHT OF WAY TO VACATE (CITY VACATES PUBLIC ROW TO BE VACATED OR DISPOSED OF BY CITY)

EXISTING CITY OWNED EASEMENT (CITY VACATES PUBLIC ROW FOR PROJECT)

CITY OF WASCO
T.27S. R.24E. M. D. M.

SECTION 1
R. 2 4E.

R. 2 5E.

T
.
26 S
.

T
.
27 S
. HIGHWA Y 4 3
3 2
4 23
87 NO.

EASEMENT NOTES

DESCRIPTION
2 3
(NE 1/2 OF THE NE 1/4)
2000-60357, 2008-183252

SUBJECT TO OIL, GAS, MINERAL LEASE PER INSTRUMENT
4 (NE 1/4 OF THE NE 1/4 EXCEPT E. 122.23 FEET)
1982-017377 BK. 5481, PG. 885

SUBJECT TO OIL, GAS, MINERAL LEASE PER INSTRUMENT
RIGHTS PER BK 3478, PG. 845
SUBJECT TO OIL, GAS, PETROLEUM, ETC.

PER BK. 6153 PG. 2041 ORKC

SUBJECT TO WASCO REDEVELOPMENT PROJECT
7 8
2009-160444, 2009-160452, 2000-085648, ORKC

SUBJECT TO OIL, GAS, MINERAL LEASE PER INSTRUMENT
23 EXACT LOCATION NOT DISCLOSED
PER 2013-125476 ORKC,

TELECOMMUNICATIONS EASEMENT,
COUNTY ROAD RECORD 0181-0241, ORKC
30' DECLARED PUBLIC HIGHWAY PER
M
CC
O
M
B
S

AV
E
NU
E
2 SEE MAP RW-T6602
3RW-T6601
HST "S" LINE
MAP NO. RW-T6601
FEET 0 25 50 100 150

AT&S F RW
LIMITS

WASCO CITY
LIMITS

WASCO CITY
43 DIRT

ANNIN AVE
15520
+
00 15525
+
00 SHEET NO.TOTAL SHEETS

DATE REVISION S BY

DATE REVISION S BY

DATE REVISION S BYDATE REVISION S BY
DWG No.

FRESNO TO BAKERSFIELD

CALIFORNIA HIGH-SPEED TRAIN PROJECT

PMCONTRACT
SURVEYO R IN CHA RGE:

NOTES
LEGEND
(R)
LEGEND
dpoulson 9/8/2022 11:16:17 AMCHSR-ROW-Appraisal.tblCHSR-ROW-PDF_half.pltY:\Jobs\21303 CHSR CP 4 Team B\MicroStation FB Maps\Agreem ent Exhibits\City of Wasco\4S-RW-T6602-Z5.dgn TO OBTAIN GROUND LEVEL DISTANCES.

MULTIPLY DISTANCES BY 1.000066514
(T)
SF
S.P.R.R.

DISTANCES.

DISTANCES AND STATIONING ARE GRID
SURVEY FEET.

EPOCH 2007.0. DISTANCES ARE U.S.

COORDINATE SYSTEM OF 1983, ZONE 4

ARE BASED ON THE CALIFORNIA

COORDINATES, BEARINGS AND DISTANCES
Southern Pacific Rail Rd
Square Feet
Total Distance
Radial Bearing
Required for Others
Title to State
Exist Property Line
Exist Easement Line
-SupersededHistoric R/W
Access Superseded
Access Prohibited
COUNTY
22CP4 KER

CITY OF WASCO

RIGHT OF WAY

TRANSFER AGREEMENT EXHIBIT

CITY OF WASCO
T.27S. R.24E. M. D. M.

SECTION 1 R
.
24 E
.

R
. 25
E
.

H
IGH
W
A
Y

43 ANN
IN

AV
E
NU
E
32 4 23
87 NO.

EASEMENT NOTES

DESCRIPTION
2 3
4 7
8 23
(NE 1/4 OF THE NE 1/4 EXCEPT E. 122.23 FEET)
1982-017377 BK. 5481, PG. 885

SUBJECT TO OIL, GAS, MINERAL LEASE PER INSTRUMENT
(NE 1/2 OF THE NE 1/4)
2000-60357, 2008-183252

SUBJECT TO OIL, GAS, MINERAL LEASE PER INSTRUMENT
RIGHTS PER BK 3478, PG. 845
SUBJECT TO OIL, GAS, PETROLEUM, ETC.

PER BK. 6153 PG. 2041 ORKC

SUBJECT TO WASCO REDEVELOPMENT PROJECT
2009-160444, 2009-160452, 2000-085648, ORKC

SUBJECT TO OIL, GAS, MINERAL LEASE PER INSTRUMENT

EXACT LOCATION NOT DISCLOSED
PER 2013-125476 ORKC,

TELECOMMUNICATIONS EASEMENT,
PER PM NO. 9865 (BK 48 PG 23), ORKC
40' RECIPROCAL EASEMENT FOR A DRILL TRACK
RECORD 0431-0502, ORKC
30' DECLARED ROAD PER COUNTY ROAD
ORKC
177 AND AMENDED BY BK 3005 PG 345,
20' PIPELINE EASEMENT PER BK 2533 PG
AMENDED BY BK 3005 PG 345, ORKC
PER BK 2533 PG 177 AND
45' PIPELINE EASEMENT
BK.48 PG.23&24
P.M. 9865
SEE MAP RW-T6601
SEE MAP RW-T6604
4RW-T6602
MAP NO. RW-T6602
FEET 0 25 50 100 150
H
S
T

"S
" L
IN
E

AT&SF R/W
43 LIMITS

WASCO CITY
CITY OF WASCO ROW TRANSFER AGREEMENT CONSTRUCTION PACKAGE 4 - EXHIBIT A

EXISTING FEE (TRANSFER OF FEE PROPERTY FROM CITY TO STATE)

EXISTING FEE (TRANSFER OF FEE PROPERTY FROM CITY TO STATE - CITY RESERVES STREET RIGHTS)

REPLACEMENT RIGHT OF WAY (TRANSFER OF FEE PROPERTY FROM STATE TO CITY)

REPLACEMENT RIGHT OF WAY (STATE TRANSFERS CITY STREET RIGHTS ONLY)

SUPERCEDED EXISTING CITY RIGHT OF WAY TO MITIGATE (CITY VACATES PUBLIC ROW, TRANSFER OF FEE PROPERTY FROM CITY TO STATE)

SUPERCEDED EXISTING CITY RIGHT OF WAY TO VACATE (CITY VACATES PUBLIC ROW TO BE VACATED OR DISPOSED OF BY CITY)

EXISTING CITY OWNED EASEMENT (CITY VACATES PUBLIC ROW FOR PROJECT) AS PH
AS PH
DIRT
UB

CENTRAL V AL L EY HWY
15 5 30+0 0
1 5 5 3 5+0 0
1 5 5 4 0+0 0
SHEET NO.TOTAL SHEETS

DATE REVISION S BY

DATE REVISION S BY

DATE REVISION S BYDATE REVISION S BY
DWG No.

FRESNO TO BAKERSFIELD

CALIFORNIA HIGH-SPEED TRAIN PROJECT

PMCONTRACT
SURVEYO R IN CHA RGE:

NOTES
LEGEND
(R)
LEGEND
dpoulson 9/14/2022 7:33:46 AM CHSR-ROW-Appraisal.tblCHSR-ROW-PDF_half.pltY:\Jobs\21303 CHSR CP 4 Team B\MicroStation FB Maps\Agreem ent Exhibits\City of Wasco\4S-RW-T6604-Z5.dgn TO OBTAIN GROUND LEVEL DISTANCES.

MULTIPLY DISTANCES BY 1.000066514
(T)
SF
S.P.R.R.

DISTANCES.

DISTANCES AND STATIONING ARE GRID
SURVEY FEET.

EPOCH 2007.0. DISTANCES ARE U.S.

COORDINATE SYSTEM OF 1983, ZONE 4

ARE BASED ON THE CALIFORNIA

COORDINATES, BEARINGS AND DISTANCES
Southern Pacific Rail Rd
Square Feet
Total Distance
Radial Bearing
Required for Others
Title to State
Exist Property Line
Exist Easement Line
-SupersededHistoric R/W
Access Superseded
Access Prohibited
COUNTY
22CP4 KER

CITY OF WASCO

RIGHT OF WAY

TRANSFER AGREEMENT EXHIBIT

CITY OF WASCO
T.27S. R.24E. M. D. M.

SECTION 1
T.27S. R.25E. M. D. M.

SECTION 6
R. 2 5E.

R. 2 4E.
87 87
5 6
87 23 87 7 8

EASEMENT NOTES
DESCRIPTIONNO.
2011-035778, 2012-145732, ORKC
2011-124775, 2011-029275, 2011-029276, 2011-035777,
2006-237123, 2007-030459, 2010-037011, 2010-037012,

SUBJECT TO OIL, GAS, MINERAL LEASE PER INSTRUMENT
BK 1614, PG. 6; BK 3010, PG. 94
BK 664, PG. 492; BK 1121, PG. 51

SUBJECT TO OIL, GAS, PETROLEUM, ETC RIGHTS PER
PER BK. 6153 PG. 2041 ORKC

SUBJECT TO WASCO REDEVELOPMENT PROJECT
2009-160444, 2009-160452, 2000-085648, ORKC

SUBJECT TO OIL, GAS, MINERAL LEASE PER INSTRUMENT
AND AMENDED BY BK 3440 PG 403, ORKC
27' PG&E EASEMENT PER BK 2896 PG 112
PER PM NO. 9865 (BK 48 PG 23), ORKC
40' RECIPROCAL EASEMENT FOR A DRILL TRACK

AT&SF R/W
9 R.S. 20-198
2014-031961, 2014-031962, 2014-031965, ORKC

SUBJECT TO OIL, GAS, MINERAL LEASE PER INSTRUMENT

EASEMENT FOR PG&E
PROPOSED 100' OVERHEAD
PER PM NO. 9865 (BK 48 PG 23), ORKC
40' RECIPROCAL EASEMENT FOR A DRILL TRACK
SEE MAP RW-M6607
SEE MAP RW-T6602
RW-T6604 5
MAP NO. RW-T6604
HST "S" LINE
FEET 0 25 50 100 150

AT&SF R/W
HIG HWAY 4 343
LIMITS

WASCO CITY
BK.48 PG.23&24
P.M. 9865
G
R
O
M
E
R

A
L
IGN
M
E
N
T
7 8
9 5
6 23

EXACT LOCATION NOT DISCLOSED
PER 2013-125476 ORKC,

TELECOMMUNICATIONS EASEMENT,
CITY OF WASCO ROW TRANSFER AGREEMENT CONSTRUCTION PACKAGE 4 - EXHIBIT A

EXISTING FEE (TRANSFER OF FEE PROPERTY FROM CITY TO STATE)

EXISTING FEE (TRANSFER OF FEE PROPERTY FROM CITY TO STATE - CITY RESERVES STREET RIGHTS)

REPLACEMENT RIGHT OF WAY (TRANSFER OF FEE PROPERTY FROM STATE TO CITY)

REPLACEMENT RIGHT OF WAY (STATE TRANSFERS CITY STREET RIGHTS ONLY)

SUPERCEDED EXISTING CITY RIGHT OF WAY TO MITIGATE (CITY VACATES PUBLIC ROW, TRANSFER OF FEE PROPERTY FROM CITY TO STATE)

SUPERCEDED EXISTING CITY RIGHT OF WAY TO VACATE (CITY VACATES PUBLIC ROW TO BE VACATED OR DISPOSED OF BY CITY)

EXISTING CITY OWNED EASEMENT (CITY VACATES PUBLIC ROW FOR PROJECT) D
I
R
T
A
SP
H
A
S
P
H
C
ON
C
A
SP
H
D
I
R
T
UB
UB
UB
UB
UB
TANKS
ASPH
15545
+
00 SHEET NO.TOTAL SHEETS

DATE REVISION S BY

DATE REVISION S BY

DATE REVISION S BYDATE REVISION S BY
DWG No.

FRESNO TO BAKERSFIELD

CALIFORNIA HIGH-SPEED TRAIN PROJECT

PMCONTRACT
SURVEYO R IN CHA RGE:

NOTES
LEGEND
(R)
LEGEND
dpoulson 9/8/2022 11:21:05 AMCHSR-ROW-Appraisal.tblCHSR-ROW-PDF_half.pltY:\Jobs\21303 CHSR CP 4 Team B\MicroStation FB Maps\Agreem ent Exhibits\City of Wasco\4S-RW-T6607-Z5.dgn TO OBTAIN GROUND LEVEL DISTANCES.

MULTIPLY DISTANCES BY 1.000066514
(T)
SF
S.P.R.R.

DISTANCES.

DISTANCES AND STATIONING ARE GRID
SURVEY FEET.

EPOCH 2007.0. DISTANCES ARE U.S.

COORDINATE SYSTEM OF 1983, ZONE 4

ARE BASED ON THE CALIFORNIA

COORDINATES, BEARINGS AND DISTANCES
Southern Pacific Rail Rd
Square Feet
Total Distance
Radial Bearing
Required for Others
Title to State
Exist Property Line
Exist Easement Line
-SupersededHistoric R/W
Access Superseded
Access Prohibited
COUNTY
22CP4 KER

CITY OF WASCO

RIGHT OF WAY

TRANSFER AGREEMENT EXHIBIT

CITY OF WASCO
T.27S. R.24E. M. D. M.

SECTION 1
R
.
24 E
.

R
. 25
E
.

F

S
T
R
EET
H
IGH
W
AY

43 7 10 23
7 8

EASEMENT NOTES
DESCRIPTIONNO.

PER BK. 6153 PG. 2041 ORKC

SUBJECT TO WASCO REDEVELOPMENT PROJECT
2014-031962, 2014-031965, 2014-093519, ORKC
2009-160444, 2009-160452, 2014-031961,

SUBJECT TO OIL, GAS, MINERAL LEASE PER INSTRUMENT

EXACT LOCATION NOT DISCLOSED
PER 2013-125476 ORKC,

TELECOMMUNICATIONS EASEMENT,
PER PM NO. 9865 (BK 48 PG 23), ORKC
40' RECIPROCAL EASEMENT FOR A DRILL TRACK
PER DOC. 1995-010734, ORKC
15' PUBLIC UTILITY EASEMENT
PER BK 2636 PG 316, ORKC
25' PIPELINE EASEMENT
PER BK 6193 PG 2066, ORKC
10' PUBLIC UTILITY EASEMENT

CITY OF WASCO
T.27S. R.25E. M. D. M.

SECTION 6
BK.48 PG.23&24
P.M. 9865
92009-160444, 2009-160452, 2000-085648, ORKC

SUBJECT TO OIL, GAS, MINERAL LEASE PER INSTRUMENT
2014-031961, 2014-031962, 2014-031965, ORKC

SUBJECT TO OIL, GAS, MINERAL LEASE PER INSTRUMENT
SEE MAP RW-T6608
SEE MAP RW-T6604
MAP NO. RW-T6607
RW-T6607 6
FEET 0 25 50 100 150
H
S
T

"S
" L
IN
E

AT&SF R/W
43 7
10 23
9 8
CITY OF WASCO ROW TRANSFER AGREEMENT CONSTRUCTION PACKAGE 4 - EXHIBIT A

EXISTING FEE (TRANSFER OF FEE PROPERTY FROM CITY TO STATE)

EXISTING FEE (TRANSFER OF FEE PROPERTY FROM CITY TO STATE - CITY RESERVES STREET RIGHTS)

REPLACEMENT RIGHT OF WAY (TRANSFER OF FEE PROPERTY FROM STATE TO CITY)

REPLACEMENT RIGHT OF WAY (STATE TRANSFERS CITY STREET RIGHTS ONLY)

SUPERCEDED EXISTING CITY RIGHT OF WAY TO MITIGATE (CITY VACATES PUBLIC ROW, TRANSFER OF FEE PROPERTY FROM CITY TO STATE)

SUPERCEDED EXISTING CITY RIGHT OF WAY TO VACATE (CITY VACATES PUBLIC ROW TO BE VACATED OR DISPOSED OF BY CITY)

EXISTING CITY OWNED EASEMENT (CITY VACATES PUBLIC ROW FOR PROJECT) SHEET NO.TOTAL SHEETS

DATE REVISION S BY

DATE REVISION S BY

DATE REVISION S BYDATE REVISION S BY
DWG No.

FRESNO TO BAKERSFIELD

CALIFORNIA HIGH-SPEED TRAIN PROJECT

PMCONTRACT
SURVEYO R IN CHA RGE:

NOTES
LEGEND
(R)
LEGEND
dpoulson 9/8/2022 11:22:23 AMCHSR-ROW-Appraisal.tblCHSR-ROW-PDF_half.pltY:\Jobs\21303 CHSR CP 4 Team B\MicroStation FB Maps\Agreem ent Exhibits\City of Wasco\4S-RW-T6608-Z5.dgn TO OBTAIN GROUND LEVEL DISTANCES.

MULTIPLY DISTANCES BY 1.000066514
(T)
SF
S.P.R.R.

DISTANCES.

DISTANCES AND STATIONING ARE GRID
SURVEY FEET.

EPOCH 2007.0. DISTANCES ARE U.S.

COORDINATE SYSTEM OF 1983, ZONE 4

ARE BASED ON THE CALIFORNIA

COORDINATES, BEARINGS AND DISTANCES
Southern Pacific Rail Rd
Square Feet
Total Distance
Radial Bearing
Required for Others
Title to State
Exist Property Line
Exist Easement Line
-SupersededHistoric R/W
Access Superseded
Access Prohibited
COUNTY
22CP4 KER

CITY OF WASCO

RIGHT OF WAY

TRANSFER AGREEMENT EXHIBIT

CITY OF WASCO
T.27S. R.24E. M. D. M.

SECTION 1
T.27S. R.25E. M. D. M.

SECTION 6
R. 2 4E.

R. 2 5E.

S
E
C
.
1 S
E
C
.
1 2
HIG HWA Y 4 3

F STRE E T
7 8
7 10 23
7 13 23
7 23 7 23
DEED BK 4845 PG 197, ORKC

AND EGRESS EASEMENT AS RESERVED IN
2268, ORKC TOGETHER WITH 40' INGRESS
40' STREET EASEMENT PER BK 5188 PG
PER BK 5188 PG 2268, ORKC
40' STREET EASEMENT
PER BK 2636 PG 316, ORKC
25' PIPELINE EASEMENT

AT&SF RW
9 BK. 47 PG. 48
P.M. 10135
PAR CE L 3

EASEMENT N OT ES
DESC RIPTIO NNO.
7 9
10 13
23 PER BK. 6 1 5 3 PG. 2 0 4 1 ORKC

SUBJECT TO WASCO REDEVE LOPMENT PROJECT
2 0 1 4-0 3 1 9 6 2, 2 0 1 4-0 3 1 9 6 5, 2 0 1 4-0 9 3 5 1 9, ORKC 2 0 0 9-1 6 0 4 4 4, 2 0 0 9-1 6 0 4 5 2, 2 0 1 4-0 3 1 9 6 1,

SUBJECT TO OIL, G AS, MINERAL L EASE PER INSTRUMENT
20 14-031 962, 201 4-0 31965, ORKC
2 009-16 0 4 44, 20 09-16045 2, 201 4-03 1961,

SUBJECT TO OIL, G AS, MINERAL L EASE PER INSTRUMENT

EX ACT LOCATIO N N OT DISCLOSED
PER 2 0 1 3-1 2 5 4 7 6 ORKC,

T E L ECOM MU NICATIO NS EASEMENT,
8 2 0 0 9-1 6 0 4 4 4, 2 0 0 9-1 6 0 4 5 2, 2 0 0 0-0 8 5 6 4 8, ORKC

SUBJECT TO OIL, G AS, MINERAL L EASE PER INSTRUMENT
2 0 1 4-0 3 1 9 6 1, 2 0 1 4-0 3 1 9 6 2, 2 0 1 4-0 3 1 9 6 5, ORKC

SUBJECT TO OIL, G AS, MINERAL L EASE PER INSTRUMENT
PAR CE L 3
BK. 23 PG. 161
P.M. 05117
SEE MAP RW-T6607
SEE MAP RW-T6609
MAP NO. RW-T6608
RW-T6608
HST "S" LINE
FEET 0 25 50 100 150
43 H
IG
H
W
A
Y

466
193

P
G

2 0
6 6
,
O
R
K
C
E
A
S
E
M
E
N
T

P
E
R

B
K

10 '
P
U
B
L
IC

U
T
IL
IT
Y

O
R
K
C
DO
C
.
1995
-
010734
,

E
A
S
E
M
E
N
T

P
E
R

15 '
P
U
B
L
IC

U
T
IL
IT
Y
1 5 5 5 0+0 0
1 5 5 5 5+0 0
1 5 5 6 0+0 0
DIRT
AS PHC
ON
C
DIRT
AS PH
UB
TSTS
TS
TS
TS
TS
TS
F ST
T
ANK
S
31 80+00
3 1 8 5+0 0
31 9 0+00
BNS F ML-01
BNS F 7 3 3
8BNS F
73 3 5
BNS F 7 3 3 7
BNS F 73 02

AT&SF RW
7 CITY OF WASCO ROW TRANSFER AGREEMENT CONSTRUCTION PACKAGE 4 - EXHIBIT A

EXISTING FEE (TRANSFER OF FEE PROPERTY FROM CITY TO STATE)

EXISTING FEE (TRANSFER OF FEE PROPERTY FROM CITY TO STATE - CITY RESERVES STREET RIGHTS)

REPLACEMENT RIGHT OF WAY (TRANSFER OF FEE PROPERTY FROM STATE TO CITY)

REPLACEMENT RIGHT OF WAY (STATE TRANSFERS CITY STREET RIGHTS ONLY)

SUPERCEDED EXISTING CITY RIGHT OF WAY TO MITIGATE (CITY VACATES PUBLIC ROW, TRANSFER OF FEE PROPERTY FROM CITY TO STATE)

SUPERCEDED EXISTING CITY RIGHT OF WAY TO VACATE (CITY VACATES PUBLIC ROW TO BE VACATED OR DISPOSED OF BY CITY)

EXISTING CITY OWNED EASEMENT (CITY VACATES PUBLIC ROW FOR PROJECT) (FULL TAKE)
DATED FEBRUARY 04, 2016, K.C.O.R.

GRANT DEED DOCUMENT: 000216014680
SHEET NO.TOTAL SHEETS

DATE REVISION S BY

DATE REVISION S BY

DATE REVISION S BYDATE REVISION S BY
DWG No.

FRESNO TO BAKERSFIELD

CALIFORNIA HIGH-SPEED TRAIN PROJECT

PMCONTRACT
SURVEYO R IN CHA RGE:

NOTES
LEGEND
(R)
LEGEND
dpoulson 9/13/2022 10:05:49 AMCHSR-ROW-Appraisal.tblCHSR-ROW-PDF_half.pltY:\Jobs\21303 CHSR CP 4 Team B\MicroStation FB Maps\Agreem ent Exhibits\City of Wasco\4S-RW-T6609-Z5.dgn TO OBTAIN GROUND LEVEL DISTANCES.

MULTIPLY DISTANCES BY 1.000066514
(T)
SF
S.P.R.R.

DISTANCES.

DISTANCES AND STATIONING ARE GRID
SURVEY FEET.

EPOCH 2007.0. DISTANCES ARE U.S.

COORDINATE SYSTEM OF 1983, ZONE 4

ARE BASED ON THE CALIFORNIA

COORDINATES, BEARINGS AND DISTANCES
Southern Pacific Rail Rd
Square Feet
Total Distance
Radial Bearing
Required for Others
Title to State
Exist Property Line
Exist Easement Line
-SupersededHistoric R/W
Access Superseded
Access Prohibited
COUNTY
22CP4 KER

CITY OF WASCO

RIGHT OF WAY

TRANSFER AGREEMENT EXHIBIT

CITY OF WASCO
T.27S. R.25E. M. D. M.

SECTION 7
T.27S. R.24E. M. D. M.

SECTION 12
R. 2 5E.

R. 2 4E.

S
E
C
.
1 S
E
C
.
1 2
4 T
H

S
T
R
EET
10' GAS PIPE LINE EASEMENT PER BK 3976 PG 961, ORKC
7 15 23
7 11 12 23 7 11 12 23 7 11 12 23
7 12 15 23
7 11 12 15 23
PER BK 1240 PG 318, ORKC
7' POLE LINE EASEMENT
PER BK 3976 PG 961, ORKC
10' GAS PIPE LINE EASEMENT
ORKC
PER DOC #0198083187,

POSSIBLY EXPIRED,

BEST FIT, LEASE

COMMUNICATIONS SITE,
PER BK 6176 PG 548, ORKC
10' PG&E PIPE AND POLE LINE EASEMENT

HOME EXTENSION COLONY
ON LOT 55 OF THE FOURTH
9' ALLEY PER SUBDIVISION
S
E
C
.
6 S
E
C
.
7 7 11 12 23 7 11 12 23
7 11 12 23

LEGAL PARCEL
030-192-03 COMPRISE ONE
ONLY: BOTH 030-192-06 &

ASSESSOR'S PARCEL LINE
SEE MAP RW-T6610
SEE MAP RW-T6608
MAP NO. RW-T6609
RW-T6609 8
HST "S" LINE
FEET 0 25 50 100 150
1 5 5 6 5+0 0
1 5 5 7 0+0 0
1 5 5 7 5+0 0
RUIN
TS
TS
TS
TS
TS
DP
DIRT
D
I
R
T
DIRT
A
SP
H
AS PH
RUIN
UB
F ST
G ST
4TH ST

AT&S F RW
H
IGH
W
AY

46 DOCUMENT NO. 219141533 ORKC
SERVICE EASEMENT USE PER RESOLUTION NO. 2019-332,

THIS AREA HAS VACATED ALL STREET, HIGHWAY, AND PUBLIC
80 (V ACAT ED)

G STRE E T
80 40

EASEMENT NOTES
DESCRIPTIONNO.
7 12
11 15
23 PER BK. 6153 PG. 2041 ORKC

SUBJECT TO WASCO REDEVELOPMENT PROJECT
PER BK. 6779, PG. 1178, ORKC

PARTICIPANT OF WASCO REDEVELOPMENT PROJECT
RIGHTS PER BK. 2, PG. 40 OF AGREEMENTS, ORKC

SUBJECT TO CONTRACT OF SETTLEMENT OF WATER
DEEDS, AMENDED PER BK. 758, PG. 454, ORKC
RESTRICTIONS PER BK. 188, PG. 153 OF

SUBJECT TO COVENANTS, CONDITIONS AND

EXACT LOCATION NOT DISCLOSED
PER 2013-125476 ORKC,

TELECOMMUNICATIONS EASEMENT,
CITY OF WASCO PER RESOLUTION NO. 2000-1962

IRREVOCABLE OFFER OF DEDICATION TO THE

DEDICATED AS PUE, AND PROVIDED AS AN

THIS AREA HAS BEEN VACATED AS A STREET,
40 CITY OF WASCO ROW TRANSFER AGREEMENT CONSTRUCTION PACKAGE 4 - EXHIBIT A

EXISTING FEE (TRANSFER OF FEE PROPERTY FROM CITY TO STATE)

EXISTING FEE (TRANSFER OF FEE PROPERTY FROM CITY TO STATE - CITY RESERVES STREET RIGHTS)

REPLACEMENT RIGHT OF WAY (TRANSFER OF FEE PROPERTY FROM STATE TO CITY)

REPLACEMENT RIGHT OF WAY (STATE TRANSFERS CITY STREET RIGHTS ONLY)

SUPERCEDED EXISTING CITY RIGHT OF WAY TO MITIGATE (CITY VACATES PUBLIC ROW, TRANSFER OF FEE PROPERTY FROM CITY TO STATE)

SUPERCEDED EXISTING CITY RIGHT OF WAY TO VACATE (CITY VACATES PUBLIC ROW TO BE VACATED OR DISPOSED OF BY CITY)

EXISTING CITY OWNED EASEMENT (CITY VACATES PUBLIC ROW FOR PROJECT) FB-15-0167-1
FB-15-9004-1
FB-15-0167-2
FB-15-0589-1
FB-15-0588-1
A
SP
H
DIRT
FPFP
C
O
N
C
AS PH
AS PH
A
SP
H
AS PH
AS PH
A
SP
HDIRT
ASPH
D
I
R
T
DIRT
CO NC
AS PH
A
SP
H
DIRT
RAMP
UB
UB
RS
RS
T
D
I
R
T
7TH ST
F ST
G ST
1 5 5 7 5+0 0
1 5 5 8 0+0 0
1 5 5 8 5+0 0
SHEET NO.TOTAL SHEETS

DATE REVISION S BY

DATE REVISION S BY

DATE REVISION S BYDATE REVISION S BY
DWG No.

FRESNO TO BAKERSFIELD

CALIFORNIA HIGH-SPEED TRAIN PROJECT

PMCONTRACT
SURVEYO R IN CHA RGE:

NOTES
LEGEND
(R)
LEGEND
dpoulson 9/13/2022 10:25:10 AMCHSR-ROW-Appraisal.tblCHSR-ROW-PDF_half.pltY:\Jobs\21303 CHSR CP 4 Team B\MicroStation FB Maps\Agreem ent Exhibits\City of Wasco\4S-RW-T6610-Z5.dgn TO OBTAIN GROUND LEVEL DISTANCES.

MULTIPLY DISTANCES BY 1.000066514
(T)
SF
S.P.R.R.

DISTANCES.

DISTANCES AND STATIONING ARE GRID
SURVEY FEET.

EPOCH 2007.0. DISTANCES ARE U.S.

COORDINATE SYSTEM OF 1983, ZONE 4

ARE BASED ON THE CALIFORNIA

COORDINATES, BEARINGS AND DISTANCES
Southern Pacific Rail Rd
Square Feet
Total Distance
Radial Bearing
Required for Others
Title to State
Exist Property Line
Exist Easement Line
-SupersededHistoric R/W
Access Superseded
Access Prohibited
COUNTY
22CP4 KER

CITY OF WASCO

RIGHT OF WAY

TRANSFER AGREEMENT EXHIBIT

CITY OF WASCO
T.27S. R.25E. M. D. M.

SECTION 7
T.27S. R.24E. M. D. M.

SECTION 12
R. 2 4E.
6 T
H

S
T
R
EET
7 T
H

S
T
R
EET
7 11 12 15 23
16 7 12 17 23
7 12
7 12

EXISTING TITLE ENCUMBRANCE
23 23 11 12 37

G STRE E T(V ACAT ED)

G STRE E T
(VA
C
A
TE
D
)
5 T
H

S
T
R
E
E
T
AREA=16393 SF

TOTAL VACATED
SEE MAP RW-T6609
SEE MAP RW-T6611
MAP NO. RW-T6610
RW-T6610 9
FEET 0 25 50 100 150
HST "S" LINE
R. 2 5E.

AT&SF R/W
DOCUMENT NO. 219141533 ORKC
SERVICE EASEMENT USE PER RESOLUTION NO. 2019-332,

THIS AREA HAS VACATED ALL STREET, HIGHWAY, AND PUBLIC
14 36
40 40 80
40 80
80 80
7 12
11 14
15 16
17 23PER BK. 6153 PG. 2041 ORKC

SUBJECT TO WASCO REDEVELOPMENT PROJECT
PER BK. 6779, PG. 1178, ORKC

PARTICIPANT OF WASCO REDEVELOPMENT PROJECT
RIGHTS PER BK. 2, PG. 40 OF AGREEMENTS, ORKC

SUBJECT TO CONTRACT OF SETTLEMENT OF WATER
PROGRAM PER DOC #0201070486, ORKC

SUBJECT TO TRANSPORTATION ENHANCEMENT ACTIVITIES
PER BK. 6594, PG. 1472, ORKC
PORTIONS OF 20' EASEMENT FACILITIES
PER BK. 7017, PG. 1527, ORKC

PARTICIPANT OF WASCO REDEVELOPMENT PROJECT
36 37

EXACT LOCATION NOT DISCLOSED
PG&E POLE LINE EASEMENT, PER BK. 3440 PG. 403 ORKC,
BK. 55 PG. 354 OF DEEDS

SUBJECT TO RESERVATIONS AND PROVISIONS PER
40 EASEMENT NOTES
NO. NO. DESCRIPTION
2000-1962
DEDICATION TO THE CITY OF WASCO PER RESOLUTION NO.

AS PUE, AND PROVIDED AS AN IRREVOCABLE OFFER OF

THIS AREA HAS BEEN VACATED AS A STREET, DEDICATED
PG. 454, ORKC
PER BK. 188, PG. 153 OF DEEDS, AMENDED PER BK. 758,

SUBJECT TO COVENANTS, CONDITIONS AND RESTRICTIONS

EXACT LOCATION NOT DISCLOSED
TELECOMMUNICATIONS EASEMENT, PER 2013-125476 ORKC,
CITY OF WASCO ROW TRANSFER AGREEMENT CONSTRUCTION PACKAGE 4 - EXHIBIT A

EXISTING FEE (TRANSFER OF FEE PROPERTY FROM CITY TO STATE)

EXISTING FEE (TRANSFER OF FEE PROPERTY FROM CITY TO STATE - CITY RESERVES STREET RIGHTS)

REPLACEMENT RIGHT OF WAY (TRANSFER OF FEE PROPERTY FROM STATE TO CITY)

REPLACEMENT RIGHT OF WAY (STATE TRANSFERS CITY STREET RIGHTS ONLY)

SUPERCEDED EXISTING CITY RIGHT OF WAY TO MITIGATE (CITY VACATES PUBLIC ROW, TRANSFER OF FEE PROPERTY FROM CITY TO STATE)

SUPERCEDED EXISTING CITY RIGHT OF WAY TO VACATE (CITY VACATES PUBLIC ROW TO BE VACATED OR DISPOSED OF BY CITY)

EXISTING CITY OWNED EASEMENT (CITY VACATES PUBLIC ROW FOR PROJECT) FB-15-0167-2
FB-15-0169-05-01 FB-15-0169-06-01
FB-15-0169-8
FB-15-0168-1
FB-15-9005-1
FB-15-9006-1
FB-15-0589-1
ASP
H
ASPH
A
SP
H
A
SP
H

DIRTDIRT
FPFP
DIRT
DIRT
D
I
R
TD
I
R
T
A
SP
H
D
I
R
T
TANK'S
TANK'S
T
T
AS PH
7TH ST
G ST
H ST
1 5 5 9 0+0 0
1 5 5 9 5+0 0
1 5 6 0 0+0 0
1 8" EXISTING1 8" EXISTING
1 8" EXISTING
EL. 3 2 4.0 0
BNSF 99 13
BNS F 73 0 2
BNSF ML-01
BNS F 7 309
BNS F 7 3 1 0
BNS F 7 307
BNS F 7 302
BNS F ML-01
BNS F ML-01
BNSF 730 2
BNS F 99 13
BNSF 73 06
BNS F 731 0
SHEET NO.TOTAL SHEETS

DATE REVISION S BY

DATE REVISION S BY

DATE REVISION S BYDATE REVISION S BY
DWG No.

FRESNO TO BAKERSFIELD

CALIFORNIA HIGH-SPEED TRAIN PROJECT

PMCONTRACT
SURVEYO R IN CHA RGE:

NOTES
LEGEND
(R)
LEGEND
dpoulson 9/8/2022 11:33:31 AMCHSR-ROW-Appraisal.tblCHSR-ROW-PDF_half.pltY:\Jobs\21303 CHSR CP 4 Team B\MicroStation FB Maps\Agreem ent Exhibits\City of Wasco\4S-RW-T6611-Z5.dgn TO OBTAIN GROUND LEVEL DISTANCES.

MULTIPLY DISTANCES BY 1.000066514
(T)
SF
S.P.R.R.

DISTANCES.

DISTANCES AND STATIONING ARE GRID
SURVEY FEET.

EPOCH 2007.0. DISTANCES ARE U.S.

COORDINATE SYSTEM OF 1983, ZONE 4

ARE BASED ON THE CALIFORNIA

COORDINATES, BEARINGS AND DISTANCES
Southern Pacific Rail Rd
Square Feet
Total Distance
Radial Bearing
Required for Others
Title to State
Exist Property Line
Exist Easement Line
-SupersededHistoric R/W
Access Superseded
Access Prohibited
COUNTY
22CP4 KER

CITY OF WASCO

RIGHT OF WAY

TRANSFER AGREEMENT EXHIBIT
T.27S. R.24E. M. D. M.

SECTION 12
R. 2 5E.

R. 2 4E.
7 T
H

S
T
R
EET
8 T
H

S
T
R
EE
T
9 T
H

S
T
R
EET

G STRE E T
7 12
7 12 23
ORKC
PER BK.4072 PG.298
80' SEWER EASEMENT
ORKC
PER BK.4072 PG.298
80' SEWER EASEMENT

AT&SF R/W
1211
1211
36 37
36 1277 12 23
SEE MAP RW-T6610
SEE MAP RW-T6612
MAP NO. RW-T6611
RW-T6611 10
FEET 0 25 50 100 150
HST "S" LINE

AT&SF R/W
3837
CITY OF WASCO ROW TRANSFER AGREEMENT CONSTRUCTION PACKAGE 4 - EXHIBIT A

EXISTING FEE (TRANSFER OF FEE PROPERTY FROM CITY TO STATE)

EXISTING FEE (TRANSFER OF FEE PROPERTY FROM CITY TO STATE - CITY RESERVES STREET RIGHTS)

REPLACEMENT RIGHT OF WAY (TRANSFER OF FEE PROPERTY FROM STATE TO CITY)

REPLACEMENT RIGHT OF WAY (STATE TRANSFERS CITY STREET RIGHTS ONLY)

SUPERCEDED EXISTING CITY RIGHT OF WAY TO MITIGATE (CITY VACATES PUBLIC ROW, TRANSFER OF FEE PROPERTY FROM CITY TO STATE)

SUPERCEDED EXISTING CITY RIGHT OF WAY TO VACATE (CITY VACATES PUBLIC ROW TO BE VACATED OR DISPOSED OF BY CITY)

EXISTING CITY OWNED EASEMENT (CITY VACATES PUBLIC ROW FOR PROJECT)

CITY OF WASCO
T.27S. R.25E. M. D. M.

SECTION 7

EASEMENT NOTES
DESCRIPTIONNO.
7 12
23 PER BK. 6153, PG. 2041, ORKC

SUBJECT TO WASCO REDEVELOPMENT PROJECT
RIGHTS PER BK. 2, PG. 40 OF AGREEMENTS, ORKC

SUBJECT TO CONTRACT OF SETTLEMENT OF WATER

EXACT LOCATION NOT DISCLOSED
PER 2013-125476 ORKC,

TELECOMMUNICATIONS EASEMENT,
BK. 55 PG. 354 OF DEEDS

SUBJECT TO RESERVATIONS AND PROVISIONS PER
37 36 EXACT LOCATION NOT DISCLOSED
PG&E POLE LINE EASEMENT, PER BK. 3440 PG. 403 ORKC,
38 INSTRUMENT NO. 2001-16664, ORKC, NOT PLOTTABLE

SUBJECT TO EASEMENTS, COVENANTS AND CONDITIONS PER
FB-15-0169-06-01
23/06/2017 BNSF ROW
23/0 6/2 0 1
7 BNSF ROW
SHEET NO.TOTAL SHEETS

DATE REVISION S BY

DATE REVISION S BY

DATE REVISION S BYDATE REVISION S BY
DWG No.

FRESNO TO BAKERSFIELD

CALIFORNIA HIGH-SPEED TRAIN PROJECT

PMCONTRACT
SURVEYO R IN CHA RGE:

NOTES
LEGEND
(R)
LEGEND
dpoulson 9/8/2022 11:40:20 AMCHSR-ROW-Appraisal.tblCHSR-ROW-PDF_half.pltY:\Jobs\21303 CHSR CP 4 Team B\MicroStation FB Maps\Agreem ent Exhibits\City of Wasco\4S-RW-T6612-Z5.dgn TO OBTAIN GROUND LEVEL DISTANCES.

MULTIPLY DISTANCES BY 1.000066514
(T)
SF
S.P.R.R.

DISTANCES.

DISTANCES AND STATIONING ARE GRID
SURVEY FEET.

EPOCH 2007.0. DISTANCES ARE U.S.

COORDINATE SYSTEM OF 1983, ZONE 4

ARE BASED ON THE CALIFORNIA

COORDINATES, BEARINGS AND DISTANCES
Southern Pacific Rail Rd
Square Feet
Total Distance
Radial Bearing
Required for Others
Title to State
Exist Property Line
Exist Easement Line
-SupersededHistoric R/W
Access Superseded
Access Prohibited
COUNTY
22CP4 KER

CITY OF WASCO

RIGHT OF WAY

TRANSFER AGREEMENT EXHIBIT
R. 2 5E.

R. 2 4E.

S
E
C
.
1 8
S
E
C
.
7 P
O
S
O

D
R
IV
E

G STRE E T
10 T
H

S
T
R
EE
T
7 12 23
7 15 23
7 15 23
7 15 23
7 15 23
7 15 23
7 15 23
7 18 23
)EUNEVA OCSAW( TEERTS J
BK.5029 PG.261 ORKC
PER 1977-045405
30' ROAD R/W EASEMENT
BK.5029 PG.261 ORKC
PER 1977-045405
30' ROAD R/W EASEMENT
ORKC
PER BK.4072 PG.298
80' SEWER EASEMENT

H STRE E T
413, ORKC
HIGHWAY PER BK 374, PG
80' EASEMENT FOR PUBLIC
60547
S
T
R
EET
12 T
H

1977-045405 BK.5029 PG.261, ORKC
40' ROAD R/W EASEMENT PER
BK.307 PG.175 ORKC

R/W FOR WATER LINE PER
62 63
413, ORKC
HIGHWAY PER BK 374, PG
80' EASEMENT FOR PUBLIC
ORKC
374, PG 413,

HIGHWAY PER BK

FOR PUBLIC
80' EASEMENT
SEE MAP RW-T6611
SEE MAP RW-T6620
MAP NO. RW-T6612
RW-T6612
SEE MAP RW-T6613 SEE MAP RW-T6618
FEET 0 25 50 100 150

AT&SF R/W
1 5 6 0 0+0 0
1 5 6 0 5+0 0
1 5 6 1 0+0 0
AS PH
DIRT

DIRT DIRT
ASPH
DIRT
DIRT
DIRT
ASPH
RS
DP
12TH ST
G ST
H ST
11 157
3837
FB-15-0174-07-01
CITY OF WASCO ROW TRANSFER AGREEMENT CONSTRUCTION PACKAGE 4 - EXHIBIT A

EXISTING FEE (TRANSFER OF FEE PROPERTY FROM CITY TO STATE)

EXISTING FEE (TRANSFER OF FEE PROPERTY FROM CITY TO STATE - CITY RESERVES STREET RIGHTS)

REPLACEMENT RIGHT OF WAY (TRANSFER OF FEE PROPERTY FROM STATE TO CITY)

REPLACEMENT RIGHT OF WAY (STATE TRANSFERS CITY STREET RIGHTS ONLY)

SUPERCEDED EXISTING CITY RIGHT OF WAY TO MITIGATE (CITY VACATES PUBLIC ROW, TRANSFER OF FEE PROPERTY FROM CITY TO STATE)

SUPERCEDED EXISTING CITY RIGHT OF WAY TO VACATE (CITY VACATES PUBLIC ROW TO BE VACATED OR DISPOSED OF BY CITY)

EXISTING CITY OWNED EASEMENT (CITY VACATES PUBLIC ROW FOR PROJECT)

CITY OF WASCO
SECTION 7
T.27S. R.24E. M. D. M.

SECTION 12
T.27S. R.25E. M. D. M.
7 12
15 18
23 PER BK 2, PG 40 OF AGREEMENTS, ORKC

SUBJECT TO CONTRACT OF SETTLEMENT OF WATER RIGHTS

EXACT LOCATION NOT DISCLOSED
TELECOMMUNICATIONS EASEMENT, PER 2013-125476 ORKC,
37 2001-133484, 2011-121697 BK. 5481, PG. 893

SUBJECT TO OIL, GAS, MINERAL LEASE PER INSTRUMENT
38 PG 214 OR, EXACT LOCATION UNKNOWN
50' WIDE EASEMENT FOR SUB LATERAL CANALS PER BK 128
PG. 2041 ORKC
SUBJECT TO WASCO REDEVELOPMENT PROJECT PER BK. 6153
PG. 454 ORKC
PER BK. 188 PG. 153 OF DEEDS, AMENDED PER BK. 758

SUBJECT TO COVENANTS, CONDITIONS AND RESTRICTIONS
PER BK. 188 PG. 111 OF DEEDS

SUBJECT TO CONVENANTS, CONDITIONS AND RESTRICTIONS

DESCRIPTION DESCRIPTION

EASEMENT NOTES
54 60
LINES PER BK 648, PG 201, ORKC

TELEGRAPHY LINES, AND ELECTRIC LIGHT AND POWER

FOR CANALS, DITCHES, ROAD, HIGHWAY, TELEPHONE AND

SUBJECT TO EASEMENTS, SERVITUDES AND RIGHTS OF WAY
584, ORKC
SUBJECT TO GAS AND MINERAL LEASE PER BK 5927, PG
63 62
1523, PG 483, ORKC
SUBJECT TO OIL, GAS, ASPHALTUM, ETC. RIGHTS PER BK.
1606, PG 208, ORKC
SUBJECT TO OIL, GAS, ASPHALTUM, ETC. RIGHTS PER BK.

DESCRIPTION
FB-15-0173-04-01 FB-15-0174-10-01
FB-15-0174-09-01
FB-15-0174-08-01
FB-15-0174-06-01
FB-15-0223-1
FB-15-0176-10
NO. NO. NO.

HST "S" LINE
FB-15-9007-1
SHEET NO.TOTAL SHEETS

DATE REVISION S BY

DATE REVISION S BY

DATE REVISION S BYDATE REVISION S BY
DWG No.

FRESNO TO BAKERSFIELD

CALIFORNIA HIGH-SPEED TRAIN PROJECT

PMCONTRACT
SURVEYO R IN CHA RGE:

NOTES
LEGEND
(R)
LEGEND
dpoulson 9/12/2022 2:53:44 PM CHSR-ROW-Appraisal.tblCHSR-ROW-PDF_half.pltY:\Jobs\21303 CHSR CP 4 Team B\MicroStation FB Maps\Agreem ent Exhibits\City of Wasco\4S-RW-T6613-Z5.dgn TO OBTAIN GROUND LEVEL DISTANCES.

MULTIPLY DISTANCES BY 1.000066514
(T)
SF
S.P.R.R.

DISTANCES.

DISTANCES AND STATIONING ARE GRID
SURVEY FEET.

EPOCH 2007.0. DISTANCES ARE U.S.

COORDINATE SYSTEM OF 1983, ZONE 4

ARE BASED ON THE CALIFORNIA

COORDINATES, BEARINGS AND DISTANCES
Southern Pacific Rail Rd
Square Feet
Total Distance
Radial Bearing
Required for Others
Title to State
Exist Property Line
Exist Easement Line
-SupersededHistoric R/W
Access Superseded
Access Prohibited
COUNTY
22CP4 KER

CITY OF WASCO

RIGHT OF WAY

TRANSFER AGREEMENT EXHIBIT
R. 2 5E.

R. 2 4E.

S
E
C
.
1 8
P
O
S
O

D
R
IV
E

G STRE E T
16 T
H

S
T
R
EET
7 15 19 20 21 23
7 15 19 20 21 23 7 15 19 20 21 23
7 15 19 20 21 23
7 15 19 21 23 7 15 20 21 23 7 15 19 20 21 23 2320
7 15 19 20 21 23
S
E
C
.
1 3
SEE MAP RW-T6614
SEE MAP RW-T6620 SEE MAP RW-T6618
MAP NO. RW-T6613
RW-T6613 12
SEE MAP RW-T6612
FEET 0 25 50 100 150
1 5 6 1 5+0 0
1 5 6 2 0+0 0
1 5 6 2 5+0 0
A
SP
H
ASPH
AS PH
AS PH
A
SP
H
AS PH
DIRT
UBUB
TS
TS
TS
RS
RS
RS
RS
DP DP
TANK'S
A
SP
H
13 T
H

S
T
1 6
T
H

S
T
F ST
G ST

WASCO AVE
"POS" 1 2+1 0.6 7 PR C
BNS F 7 304
BNSF ML-0 1
BNSF 7 3 05
BNS F 73 0 3 LIMITS

WASCO CITY

AT&S F R/W
1 3
T
H

S
T
R
E
E
T
WASCO A VE.
19 CITY OF WASCO ROW TRANSFER AGREEMENT CONSTRUCTION PACKAGE 4 - EXHIBIT A

EXISTING FEE (TRANSFER OF FEE PROPERTY FROM CITY TO STATE)

EXISTING FEE (TRANSFER OF FEE PROPERTY FROM CITY TO STATE - CITY RESERVES STREET RIGHTS)

REPLACEMENT RIGHT OF WAY (TRANSFER OF FEE PROPERTY FROM STATE TO CITY)

REPLACEMENT RIGHT OF WAY (STATE TRANSFERS CITY STREET RIGHTS ONLY)

SUPERCEDED EXISTING CITY RIGHT OF WAY TO MITIGATE (CITY VACATES PUBLIC ROW, TRANSFER OF FEE PROPERTY FROM CITY TO STATE)

SUPERCEDED EXISTING CITY RIGHT OF WAY TO VACATE (CITY VACATES PUBLIC ROW TO BE VACATED OR DISPOSED OF BY CITY)

EXISTING CITY OWNED EASEMENT (CITY VACATES PUBLIC ROW FOR PROJECT) T.27S. R.24E. M. D. M.

SECTION 13
7 15 19 20 21

EASEMENT NOTES
DESCRIPTIONNO.
7 PER BK. 6153, PG. 2041, ORKC

SUBJECT TO WASCO REDEVELOPMENT PROJECT
15 DEEDS, AMENDED PER BK. 758, PG. 454, ORKC
RESTRICTIONS PER BK. 188, PG. 153 OF

SUBJECT TO COVENANTS, CONDITIONS AND
RESTRICTIONS PER BK. 188, PG. 153 OF DEEDS

SUBJECT TO COVENANTS, CONDITIONS AND
18 19
20 21
RESTRICTIONS PER BK. 188, PG. 111 OF DEEDS

SUBJECT TO CONVENANTS, CONDITIONS AND
RESTRICTIONS PER BK. 1842, PG. 117, ORKC

SUBJECT TO COVENANTS, CONDITIONS AND
EASEMENT PER BK. 27, PG. 411, ORKC

SUBJECT TO POLE LINE AND ELECTRICAL
23 EXACT LOCATION NOT DISCLOSED
PER 2013-125476 ORKC,

TELECOMMUNICATIONS EASEMENT,

CITY OF WASCO
FB-15-0179-02-01
FB-15-0223-2
FB-15-0223-1
FB-15-0176-10
FB-15-0220-2
FB-15-9008-1
HST "S" LINE
FB-1 5-0176-04-0 1 FB-1 5-0176-05-01 FB-15-0176-06-0 1 FB-15-020 1-04-01 FB-15-0201-05-0 1 FB-15-020 1-06-01 FB-15-0177-03-01 FB-15-017 7-04-01 FB-15-0 178-02-01 FB-15-9007-1
AS PH
A
SP
HA
SP
H
A
SP
H
AS PH
DIRT
D
I
R
T
A
SP
H
C
ON
C
T
16 T
H

S
T
18 T
H

S
T
G ST

WASCO A VE
D
I
R
T
D
I
R
T
A
SP
H
A
SP
H
DIRT
DIRT
G ST

WASCO A VE
19 T
H

S
T
1 5 6 3 0+0 0
1 5 6 3 5+0 0
1 5 6 40+0 0
SHEET NO.TOTAL SHEETS

DATE REVISION S BY

DATE REVISION S BY

DATE REVISION S BYDATE REVISION S BY
DWG No.

FRESNO TO BAKERSFIELD

CALIFORNIA HIGH-SPEED TRAIN PROJECT

PMCONTRACT
SURVEYO R IN CHA RGE:

NOTES
LEGEND
(R)
LEGEND
dpoulson 9/12/2022 3:00:36 PM CHSR-ROW-Appraisal.tblCHSR-ROW-PDF_half.pltY:\Jobs\21303 CHSR CP 4 Team B\MicroStation FB Maps\Agreem ent Exhibits\City of Wasco\4S-RW-T6614-Z5.dgn TO OBTAIN GROUND LEVEL DISTANCES.

MULTIPLY DISTANCES BY 1.000066514
(T)
SF
S.P.R.R.

DISTANCES.

DISTANCES AND STATIONING ARE GRID
SURVEY FEET.

EPOCH 2007.0. DISTANCES ARE U.S.

COORDINATE SYSTEM OF 1983, ZONE 4

ARE BASED ON THE CALIFORNIA

COORDINATES, BEARINGS AND DISTANCES
Southern Pacific Rail Rd
Square Feet
Total Distance
Radial Bearing
Required for Others
Title to State
Exist Property Line
Exist Easement Line
-SupersededHistoric R/W
Access Superseded
Access Prohibited
COUNTY
22CP4 KER

CITY OF WASCO

RIGHT OF WAY

TRANSFER AGREEMENT EXHIBIT

COUNTY OF KERN
T.27S. R.25E. M. D. M.

SECTION 18
R. 2 5E.

R. 2 4E.
18 T
H

S
T
R
EET
19 T
H

S
T
R
EET
7 20 21 24
7 20 23 7 20 23
7 19 20 21 2423 7 19 20 21 2423
7 19 20 21 2423
25 2726

EASEMENT NOTES
DESCRIPTIONNO. NO. DESCRIPTION
PER BK. 6153, PG. 2041, ORKC

SUBJECT TO WASCO REDEVELOPMENT PROJECT
RESTRICTIONS PER BK. 188, PG. 153 OF DEEDS

SUBJECT TO COVENANTS, CONDITIONS AND
RESTRICTIONS PER BK. 1842, PG. 117, ORKC

SUBJECT TO COVENANTS, CONDITIONS AND
EASEMENT PER BK. 37, PG. 411, ORKC

SUBJECT TO POLE LINE AND ELECTRICAL

EXACT LOCATION NOT DISCLOSED
PER 2013-125476 ORKC,

TELECOMMUNICATIONS EASEMENT,
BK. 1407, PG. 301, ORKC

SUBJECT TO OIL, GAS, MINERAL LEASE PER
2009-160431, 2010-060747, ORKC
2009-160408, 2009-160409, 2009-160423,

SUBJECT TO OIL, GAS, MINERAL LEASE PER INSTRUMENT

EXACT LOCATION NOT DISLCOSED
PER BK. 4843, PG. 635, ORKC

SUBJECT TO WATER PIPELINE AGREEMENT

EXACT LOCATION NOT DISCLOSED
EXTENSION WATER COMPANY PER BK. 188, PG.37 OF DEEDS

SUBJECT TO EASEMENT FOR WATER SYSTEM OF THE FOURTH
1300-1399, ORKC

PER COUNTY ROAD RECORD
30' DECLARED HIGHWAY
PER TRACT MAP 1488
5' PUBLIC UTILITY EASEMENT,
7 19 20 21 2423
7 19 20 21 2423 7 19 20 21 2423
7 19 20 21 23
F
IL
B
U
R
N

S
T
R
EET
16 T
H

S
T
R
EET
7 20 23 7 20 23
7 19 20 21 23
SEE MAP RW-T6613
SEE MAP RW-T6615
MAP NO. RW-T6614
RW-T6614 13
FEET 0 25 50 100 150
HST "S" LINE
LIMITS

WASCO CITY
WASCO A VE.

AT&S F R/W
7 19
20 21
24 23
25 26
27 CITY OF WASCO ROW TRANSFER AGREEMENT CONSTRUCTION PACKAGE 4 - EXHIBIT A

EXISTING FEE (TRANSFER OF FEE PROPERTY FROM CITY TO STATE)

EXISTING FEE (TRANSFER OF FEE PROPERTY FROM CITY TO STATE - CITY RESERVES STREET RIGHTS)

REPLACEMENT RIGHT OF WAY (TRANSFER OF FEE PROPERTY FROM STATE TO CITY)

REPLACEMENT RIGHT OF WAY (STATE TRANSFERS CITY STREET RIGHTS ONLY)

SUPERCEDED EXISTING CITY RIGHT OF WAY TO MITIGATE (CITY VACATES PUBLIC ROW, TRANSFER OF FEE PROPERTY FROM CITY TO STATE)

SUPERCEDED EXISTING CITY RIGHT OF WAY TO VACATE (CITY VACATES PUBLIC ROW TO BE VACATED OR DISPOSED OF BY CITY)

EXISTING CITY OWNED EASEMENT (CITY VACATES PUBLIC ROW FOR PROJECT) T.27S. R.24E. M. D. M.

CITY OF WASCO
SECTION 13
FB-15-0178-02-01
FB-1 5-0 180-03-0 1
FB-15-0179-02-01
FB
-
15 -
900
9 -1
FB-1 5-0 1 8 0-0 4-0 1 FB-1 5-0 1 8 1-0 3-0 1 FB-1 5-0 1 8 1-0 4-0 1 FB-1 5-0 1 8 2-0 2-0 1 FB-1 5-0 1 8 3-0 2-0 1 FB-1 5-0 1 8 4-0 2-0 1 FB-1 5-0 1 8 5-0 4-0 1 FB-1 5-0 1 8 5-0 5-0 1 FB-1 5-0 1 8 5-0 6-0 1 FB-15-9008-1
ASPH
DIRT
DIRT
D
I
R
T
D
I
R
T
A
SP
H
AS PH

WASCO AVE

CENTRAL V AL L EY HWY
1 5 6 4 5+0 0
1 5 6 50+00 15655+00
BNS F 7 304
BNSF 7 3 05
BNSF ML-0 1
BNSF 73 03
SHEET NO.TOTAL SHEETS

DATE REVISION S BY

DATE REVISION S BY

DATE REVISION S BYDATE REVISION S BY
DWG No.

FRESNO TO BAKERSFIELD

CALIFORNIA HIGH-SPEED TRAIN PROJECT

PMCONTRACT
SURVEYO R IN CHA RGE:

NOTES
LEGEND
(R)
LEGEND
dpoulson 9/13/2022 7:52:05 AM CHSR-ROW-Appraisal.tblCHSR-ROW-PDF_half.pltY:\Jobs\21303 CHSR CP 4 Team B\MicroStation FB Maps\Agreem ent Exhibits\City of Wasco\4S-RW-T6615-Z5.dgn TO OBTAIN GROUND LEVEL DISTANCES.

MULTIPLY DISTANCES BY 1.000066514
(T)
SF
S.P.R.R.

DISTANCES.

DISTANCES AND STATIONING ARE GRID
SURVEY FEET.

EPOCH 2007.0. DISTANCES ARE U.S.

COORDINATE SYSTEM OF 1983, ZONE 4

ARE BASED ON THE CALIFORNIA

COORDINATES, BEARINGS AND DISTANCES
Southern Pacific Rail Rd
Square Feet
Total Distance
Radial Bearing
Required for Others
Title to State
Exist Property Line
Exist Easement Line
-SupersededHistoric R/W
Access Superseded
Access Prohibited
COUNTY
22CP4 KER

CITY OF WASCO

RIGHT OF WAY

TRANSFER AGREEMENT EXHIBIT
T.27S. R.24E. M. D. M.

SECTION 13
R. 2 5E.

R. 2 4E.

HIG HWA Y 4 3
F
IL
B
U
R
N

S
T
R
EET
25 2726
32 33 34 35
2322
12 2923 30 3128

EASEMENT NOTES
DESCRIPTIONNO. NO. DESCRIPTION
RIGHTS PER BK. 2, PG. 40 OF AGREEMENTS, ORKC

SUBJECT TO CONTRACT OF SETTLEMENT OF WATER
2010-138436, ORKC

SUBJECT TO OIL, GAS, MINERAL LEASE PER INSTRUMENT

EXACT LOCATION NOT DISCLOSED
PER 2013-125476 ORKC,

TELECOMMUNICATIONS EASEMENT,
2009-160431, 2010-060747, ORKC
2009-160408, 2009-160409, 2009-160423,

SUBJECT TO OIL, GAS, MINERAL LEASE PER INSTRUMENT

EXACT LOCATION NOT DISLCOSED
PER BK. 4843, PG. 635, ORKC

SUBJECT TO WATER PIPELINE AGREEMENT

EXACT LOCATION NOT DISCLOSED
EXTENSION WATER COMPANY PER BK. 188, PG.37 OF DEEDS

SUBJECT TO EASEMENT FOR WATER SYSTEM OF THE FOURTH

EXACT LOCATION NOT DISCLOSED
PER BK. 311, PG. 248, ORKC

PIPELINE EASEMENT ALONG EAST SIDE OF PROPERTY
2010-087012, 2010-138436, ORKC

SUBJECT TO OIL, GAS, MINERAL LEASE PER INSTRUMENT
SUBJECT TO WILLIAMSON ACT PER BK. 188, PG. 47

AGREEMENTS, LOCATION INDETERMINABLE
ELECTRICAL EASEMENT PER BK. 36, PG. 81 OF
PER BK. 2, AGREEMENTS, PG. 40, KCR

SUBJECT TO CONTRACT OF SETTLEMENT OF WATER RIGHTS
2011-035802, ORKC

SUBJECT TO OIL, GAS, MINERAL LEASE PER INSTRUMENT
1965 PER BK. 4249, PG. 864, ORKC

SUBJECT TO CALIFORNIA LAND CONSVERVATION ACT OF
2000-046971, 2009-144269, ORKC

SUBJECT TO MEMORANDUM OF AGREEMENT PER INSTRUMENT
PER INSTRUMENT 2005-355949 ORKC

SUBJECT TO ACCESS EASEMENT
ORKC
PER INSTRUMENT 2005-355949

SUBJECT TO DRILLING EASEMENT
1300-1399, ORKC

PER COUNTY ROAD RECORD
30' DECLARED HIGHWAY

AT&S F R/W

EXISTIN G EASEMENT

CITY OF WASCO
SEE MAP RW-T6614
SEE MAP RW-T6616
B.N.S.F.

MAP NO. RW-T6615
RW-T6615 14
HST "S" LINE
FEET 0 25 50 100 150

WASCO A VEN UE
LIMITS

WASCO CITY

AT&S F R/W
12 22
23 25
26 27
28 29
30 31
32 33
34 35
CITY OF WASCO ROW TRANSFER AGREEMENT CONSTRUCTION PACKAGE 4 - EXHIBIT A

EXISTING FEE (TRANSFER OF FEE PROPERTY FROM CITY TO STATE)

EXISTING FEE (TRANSFER OF FEE PROPERTY FROM CITY TO STATE - CITY RESERVES STREET RIGHTS)

REPLACEMENT RIGHT OF WAY (TRANSFER OF FEE PROPERTY FROM STATE TO CITY)

REPLACEMENT RIGHT OF WAY (STATE TRANSFERS CITY STREET RIGHTS ONLY)

SUPERCEDED EXISTING CITY RIGHT OF WAY TO MITIGATE (CITY VACATES PUBLIC ROW, TRANSFER OF FEE PROPERTY FROM CITY TO STATE)

SUPERCEDED EXISTING CITY RIGHT OF WAY TO VACATE (CITY VACATES PUBLIC ROW TO BE VACATED OR DISPOSED OF BY CITY)

EXISTING CITY OWNED EASEMENT (CITY VACATES PUBLIC ROW FOR PROJECT) FB-15-9009-1
AS PH
DIRT
DIRT
AS PH
R
U
I
N
'
S

WASCO A VE

CENTRAL V AL L EY HWY
15655+00
1 5 6 6 0+0 0
1 5 6 6 5+0 0
35+00
40+00
45+00
SHEET NO.TOTAL SHEETS

DATE REVISION S BY

DATE REVISION S BY

DATE REVISION S BYDATE REVISION S BY
DWG No.

FRESNO TO BAKERSFIELD

CALIFORNIA HIGH-SPEED TRAIN PROJECT

PMCONTRACT
SURVEYO R IN CHA RGE:

NOTES
LEGEND
(R)
LEGEND
dpoulson 9/14/2022 1:20:18 PM CHSR-ROW-Appraisal.tblCHSR-ROW-PDF_half.pltY:\Jobs\21303 CHSR CP 4 Team B\MicroStation FB Maps\Agreem ent Exhibits\City of Wasco\4S-RW-T6616-Z5.dgn TO OBTAIN GROUND LEVEL DISTANCES.

MULTIPLY DISTANCES BY 1.000066514
(T)
SF
S.P.R.R.

DISTANCES.

DISTANCES AND STATIONING ARE GRID
SURVEY FEET.

EPOCH 2007.0. DISTANCES ARE U.S.

COORDINATE SYSTEM OF 1983, ZONE 4

ARE BASED ON THE CALIFORNIA

COORDINATES, BEARINGS AND DISTANCES
Southern Pacific Rail Rd
Square Feet
Total Distance
Radial Bearing
Required for Others
Title to State
Exist Property Line
Exist Easement Line
-SupersededHistoric R/W
Access Superseded
Access Prohibited
COUNTY
22CP4 KER

CITY OF WASCO

RIGHT OF WAY

TRANSFER AGREEMENT EXHIBIT
R. 2 5E.

R. 2 4E.

S
E
C
.
1 9
S
E
C
.
1 8

WASCO A VEN UE
J
A
C
K
S
O
N

AV
E
N
U
E
2322
12 12 2923 30 3128

EASEMENT NOTES
DESCRIPTIONNO. NO. DESCRIPTION
RIGHTS PER BK 2, PG 40 OF AGREEMENTS, ORKC

SUBJECT TO CONTRACT OF SETTLEMENT OF WATER
2010-138436, ORKC

SUBJECT TO OIL, GAS, MINERAL LEASE PER INSTRUMENT

EXACT LOCATION NOT DISCLOSED
PER 2013-125476 ORKC,

TELECOMMUNICATIONS EASEMENT,

EXACT LOCATION NOT DISCLOSED
PER BK. 311, PG. 248, ORKC

PIPELINE EASEMENT ALONG EAST SIDE OF PROPERTY
2010-087012, 2010-138436, ORKC

SUBJECT TO OIL, GAS, MINERAL LEASE PER INSTRUMENT
SUBJECT TO WILLIAMSON ACT PER BK. 188, PG. 47

AGREEMENTS, LOCATION INDETERMINABLE
ELECTRICAL EASEMENT PER BK. 36, PG. 81 OF
ALIGNMENT PER INST# 0200166818
25' ROAD R/W FOR MAJOR HIGHWAY
1300-1399, ORKC

PER COUNTY ROAD RECORD
30' DECLARED HIGHWAY
32 33 34

AT&S F R/W

CITY OF WASCO
T.27S. R.24E. M. D. M.

SECTION 13
12 29 31
35 S
E
C
.
24 S
E
C
.
1 3
ALIGNMENT PER INST# 0200166818
25' ROAD R/W FOR MAJOR HIGHWAY
PER BK. 2, AGREEMENTS, PG. 40, KCR

SUBJECT TO CONTRACT OF SETTLEMENT OF WATER RIGHTS
2011-035802, ORKC

SUBJECT TO OIL, GAS, MINERAL LEASE PER INSTRUMENT
1965 PER BK. 4249, PG. 864, ORKC

SUBJECT TO CALIFORNIA LAND CONSVERVATION ACT OF
2000-046971, 2009-144269, ORKC

SUBJECT TO MEMORANDUM OF AGREEMENT PER INSTRUMENT
SEE MAP RW-T6615
RW-T6616 15
MAP NO. RW-T6616
SEE MAP RW-T6700
FEET 0 25 50 100 150
HST "S" LINE

AT&S F R/W
LIMITS

WASCO CITY
SEE MAP RW-T6700
12 22
23 28
29 30
31 35
34 33
32 CITY OF WASCO ROW TRANSFER AGREEMENT CONSTRUCTION PACKAGE 4 - EXHIBIT A

EXISTING FEE (TRANSFER OF FEE PROPERTY FROM CITY TO STATE)

EXISTING FEE (TRANSFER OF FEE PROPERTY FROM CITY TO STATE - CITY RESERVES STREET RIGHTS)

REPLACEMENT RIGHT OF WAY (TRANSFER OF FEE PROPERTY FROM STATE TO CITY)

REPLACEMENT RIGHT OF WAY (STATE TRANSFERS CITY STREET RIGHTS ONLY)

SUPERCEDED EXISTING CITY RIGHT OF WAY TO MITIGATE (CITY VACATES PUBLIC ROW, TRANSFER OF FEE PROPERTY FROM CITY TO STATE)

SUPERCEDED EXISTING CITY RIGHT OF WAY TO VACATE (CITY VACATES PUBLIC ROW TO BE VACATED OR DISPOSED OF BY CITY)

EXISTING CITY OWNED EASEMENT (CITY VACATES PUBLIC ROW FOR PROJECT)

COUNTY OF KERN
T.27S. R.25E. M. D. M.

SECTION 18
1399, ORKC
RECORD 1300-

CO U NTY ROA D

HIG HWAY PER
30' DECLARED
F
B
-
15 -
0 3
02 -
01 -
01 SHEET NO.TOTAL SHEETS

DATE REVISION S BY

DATE REVISION S BY

DATE REVISION S BYDATE REVISION S BY
DWG No.

FRESNO TO BAKERSFIELD

CALIFORNIA HIGH-SPEED TRAIN PROJECT

PMCONTRACT
SURVEYO R IN CHA RGE:

NOTES
LEGEND
(R)
LEGEND
dpoulson 9/8/2022 11:51:01 AMCHSR-ROW-Appraisal.tblCHSR-ROW-PDF_half.pltY:\Jobs\21303 CHSR CP 4 Team B\MicroStation FB Maps\Agreem ent Exhibits\City of Wasco\4S-RW-T6618-Z5.dgn TO OBTAIN GROUND LEVEL DISTANCES.

MULTIPLY DISTANCES BY 1.000066514
(T)
SF
S.P.R.R.

DISTANCES.

DISTANCES AND STATIONING ARE GRID
SURVEY FEET.

EPOCH 2007.0. DISTANCES ARE U.S.

COORDINATE SYSTEM OF 1983, ZONE 4

ARE BASED ON THE CALIFORNIA

COORDINATES, BEARINGS AND DISTANCES
Southern Pacific Rail Rd
Square Feet
Total Distance
Radial Bearing
Required for Others
Title to State
Exist Property Line
Exist Easement Line
-SupersededHistoric R/W
Access Superseded
Access Prohibited
COUNTY
22CP4 KER

CITY OF WASCO

RIGHT OF WAY

TRANSFER AGREEMENT EXHIBIT
SECTIO N 1 8
SEC. 1 2 SEC. 1 3
SEC. 7 SEC. 1 8

J STRE E T
T.2 7S. R.2 5E. M. D. M.

R. 2 5E.

R. 2 4E.

PER BK 6 9 1 PG 2 5 1

RIG HTS INCIDENTAL THERETO
3 0' ROA D EASEMENT A ND
PER BK 6 4 8 7 PG 1 7 9 8 OR

DEDICAT E REAL PROPERTY

IR REV OCABL E OF FER TO
7 15 19 20 21 23 7 15 19 20 21 23
7 18 23
BK 4 1 3 6, PG 7 3 5, ORKC
HIG HWA YS PER D OC. 5 9 9 5 8,

EASEMENT FOR PUBLIC
7 15 19 20 21 23
S
EE

M
A
P

R
W
-
T
6620
36 49
BK 4300 PG 256 ORKC

HIGHWAY EASEMENT PER
36 49
8 4 6, PG 4 1 6, ORKC

EASEMENT PER BK
1 0' G AS PIPE LINE
P
O
S
O

D
R
IV
E

COMPRISE O NE L EG AL PAR CE L
BOTH 0 7 2-2 4 0-0 4 & 0 7 2-2 4 0-0 5
ASSES SOR'S PAR CE L LINE O NLY:
575352 58 5936 49 575352 58 59
36 49 575352 58 59
36 49 575352 58 59
552 1 PG 1 0 8 6 OR

FACILITIES PER BK

COM MU NICATION

UN DERGROU N D

AN D REMOVE

REPAIR, REPLACE,

OPERAT E, INS PECT,

MAINTAIN, PLACE,

CO NSTRUCT A N D
45' EASEMENT TO
USES PER BK. 6484, PG. 590, ORKC

ROAD AND OTHER MUNICIPAL
45' ROW FOR INGRESS, EGRESS,
BK 4 2 8 2, PG 2 7 4, ORKC

HIG HWA Y EASEMENT PER

COMPRISE O NE L EG AL PARCE L
BOTH 072-24 0-0 7 & 07 2-2 4 0-0 6
ASSESSOR'S PAR CE L LINE O NLY:

ORKC
BK 3 7 4, PG 4 1 3,

PUBLIC HIG HWA Y PER
8 0' EASEMENT FOR
7 54 60 62 63
SEE MAP RW-T6614
SEE MAP RW-T6612
MAP NO. RW-T6618
RW-T6618 16

CITY OF WASCO
FEET 0 25 50 100 150
LIMITS

WASCO CITY
LIMITS

WASCO CITY
D
I
R
T D
I
R
T
C
ON
C
C
ON
C

UBUB UB
RS
RS
RS
DP DP
TANK'S

WASCO A VE

AT&S F R/W
CITY OF WASCO ROW TRANSFER AGREEMENT CONSTRUCTION PACKAGE 4 - EXHIBIT A

EXISTING FEE (TRANSFER OF FEE PROPERTY FROM CITY TO STATE)

EXISTING FEE (TRANSFER OF FEE PROPERTY FROM CITY TO STATE - CITY RESERVES STREET RIGHTS)

REPLACEMENT RIGHT OF WAY (TRANSFER OF FEE PROPERTY FROM STATE TO CITY)

REPLACEMENT RIGHT OF WAY (STATE TRANSFERS CITY STREET RIGHTS ONLY)

SUPERCEDED EXISTING CITY RIGHT OF WAY TO MITIGATE (CITY VACATES PUBLIC ROW, TRANSFER OF FEE PROPERTY FROM CITY TO STATE)

SUPERCEDED EXISTING CITY RIGHT OF WAY TO VACATE (CITY VACATES PUBLIC ROW TO BE VACATED OR DISPOSED OF BY CITY)

EXISTING CITY OWNED EASEMENT (CITY VACATES PUBLIC ROW FOR PROJECT) 7 15
18 19
20 21
23 DEEDS
AN INSTRUMENT RECORDED IN BK 44 PG 287 ET SEQ. OF
PER BK 2, PG 40 OF AGREEMENTS, ORKC AND MODIFIED BY

SUBJECT TO CONTRACT OF SETTLEMENT OF WATER RIGHTS
BK 691, PG 251; BK 1151, PG 257

SUBJECT TO OIL, GAS, PETROLEUM, ETC RIGHTS PER
BK. 5481, PG. 893 & BK. 5488, PG. 1507
2001-133484, 2011-121697

SUBJECT TO OIL, GAS, MINERAL LEASE PER INSTRUMENT
AND WATER RIGHTS PER BK 691, PG 251, ORKC

TELEGRAPH LINES, AND ELECTRIC LIGHT AND POWER LINES,

FOR CANALS, DITCHES, ROAD, HIGHWAY, TELEPHONE AND

SUBJECT TO EASEMENTS, SERVITUDES AND RIGHTS OF WAY
NO. 0202019581, ORKC

SUBJECT TO OIL AND GAS LEASE PER INSTRUMENT

DESCRIPTION

EASEMENT NOTES

DESCRIPTION
6153, PG. 2041, ORKC
SUBJECT TO WASCO REDEVELOPMENT PROJECT PER BK.

PG. 454, ORKC
PER BK. 188, PG. 153 OF DEEDS, AMENDED PER BK. 758,

SUBJECT TO COVENANTS, CONDITIONS AND RESTRICTIONS
PER BK. 188, PG. 111 OF DEEDS

SUBJECT TO CONVENANTS, CONDITIONS AND RESTRICTIONS
PER BK. 188, PG. 153 OF DEEDS

SUBJECT TO COVENANTS, CONDITIONS AND RESTRICTIONS
PER BK. 1842, PG. 117, ORKC

SUBJECT TO COVENANTS, CONDITIONS AND RESTRICTIONS
PER BK. 27, PG. 411, ORKC

SUBJECT TO POLE LINE AND ELECTRICAL EASEMENT

EXACT LOCATION NOT DISCLOSED
TELECOMMUNICATIONS EASEMENT, PER 2013-125476 ORKC,
62 1523, PG 483, ORKC
SUBJECT TO OIL, GAS, ASPHALTUM, ETC. RIGHTS PER BK.
63 1606, PG 208, ORKC
SUBJECT TO OIL, GAS, ASPHALTUM, ETC. RIGHTS PER BK.
60 ORKC
SUBJECT TO GAS A N D MINERAL L EASE PER BK 5 927, PG 5 8 4, 54 ORKC
WATER RIGHTS; OIL, GAS, ETC. RIGHTS PER BK 648, PG 201, TELEGRAPHY LINES, AND ELECTRIC LIGHT AND POWER LINES;

FOR CANALS, DITCHES, ROAD, HIGHWAY, TELEPHONE AND

SUBJECT TO EASEMENTS, SERVITUDES AND RIGHTS OF WAY
PG 214 OR, EXACT LOCATION UNKNOWN
50' WIDE EASEMENT FOR SUB LATERAL CANALS PER BK 128
251; BK 1151, PG 260, ORKC
SUBJECT TO OIL, GAS, MINERAL LEASE PER BK 691, PG
NO. 437, BK 4, PG 30, ORKC

SUBJECT TO RESERVATIONS PER HOMESTEAD CERTIFICATE
PER BK 44, PG 287, ORKC

SUBJECT TO COVENANTS, CONDITIONS, AND RESTRICTIONS
214, ORKC
SUBJECT TO CANAL EASEMENT, NOT PLOTTABLE, BK 128, PG
32 36
59 57
58 49
52 37
38 53
SEE MAP RW-T6613
FB-15-0220-1
FB-15-0221-1
F
B-15
-022
3-1
FB-15-0223-2
FB-15-9007-1
NO.NO.

FP
A
SP
H
A
SP
H
AS PH
AS PH
D
I
R
T
P
I
P
E
UB
DP
T
ANK
T
ANK
T
ANK
H

S
T J

S
T
SHEET NO.TOTAL SHEETS

DATE REVISION S BY

DATE REVISION S BY

DATE REVISION S BYDATE REVISION S BY
DWG No.

FRESNO TO BAKERSFIELD

CALIFORNIA HIGH-SPEED TRAIN PROJECT

PMCONTRACT
SURVEYO R IN CHA RGE:

NOTES
LEGEND
(R)
LEGEND
dpoulson 9/8/2022 11:52:24 AMCHSR-ROW-Appraisal.tblCHSR-ROW-PDF_half.pltY:\Jobs\21303 CHSR CP 4 Team B\MicroStation FB Maps\Agreem ent Exhibits\City of Wasco\4S-RW-T6619-Z5.dgn TO OBTAIN GROUND LEVEL DISTANCES.

MULTIPLY DISTANCES BY 1.000066514
(T)
SF
S.P.R.R.

DISTANCES.

DISTANCES AND STATIONING ARE GRID
SURVEY FEET.

EPOCH 2007.0. DISTANCES ARE U.S.

COORDINATE SYSTEM OF 1983, ZONE 4

ARE BASED ON THE CALIFORNIA

COORDINATES, BEARINGS AND DISTANCES
Southern Pacific Rail Rd
Square Feet
Total Distance
Radial Bearing
Required for Others
Title to State
Exist Property Line
Exist Easement Line
-SupersededHistoric R/W
Access Superseded
Access Prohibited
COUNTY
22CP4 KER

CITY OF WASCO

RIGHT OF WAY

TRANSFER AGREEMENT EXHIBIT
MAP NO. RW-T6619
RW-T6617 17
FEET 0 25 50 100 150

CITY OF WASCO
T.2 7S. R.2 5E. M. D. M.

SECTION 7
R
.
25 E
.

R
.
24 E
.

H

S
T
R
EET
A
T
&
SF

R
/
W

J STREET
NO. DESCRIPTION

EASEMENT NOTES
PG. 2041, ORKC
SUBJECT TO WASCO REDEVELOPMENT PROJECT PER BK. 6153,
PER BK 648, PG 201, ORKC

TELEGRAPHY LINES, AND ELECTRIC LIGHT AND POWER LINES

FOR CANALS, DITCHES, ROAD, HIGHWAY, TELEPHONE AND

SUBJECT TO EASEMENTS, SERVITUDES AND RIGHTS OF WAY
413, ORKC
PER BK 374, PG

PUBLIC HIGHWAY
80' EASEMENT FOR 62
1523, PG 483, ORKC
SUBJECT TO OIL, GAS, ASPHALTUM, ETC. RIGHTS PER BK.
63 1606, PG 208, ORKC
SUBJECT TO OIL, GAS, ASPHALTUM, ETC. RIGHTS PER BK.
7 54
60 584, ORKC
SUBJECT TO GAS AND MINERAL LEASE PER BK 5927, PG
7 54 60 62 63
2 RIGHTS PER BK 2, PG 40 OF AGREEMENTS, ORKC

SUBJECT TO CONTRACT OF SETTLEMENT OF WATER
12 38
PG 214 OR, EXACT LOCATION UNKNOWN
50' WIDE EASEMENT FOR SUB LATERAL CANALS PER BK 128
AND WATER RIGHTS PER BK 691, PG 251, ORKC

TELEGRAPHY LINES, AND ELECTRIC LIGHT AND POWER LINES,

FOR CANALS, DITCHES, ROAD, HIGHWAY, TELEPHONE AND

SUBJECT TO EASEMENTS, SERVITUDES AND RIGHTS OF WAY
49 BK 44, PG 287, ORKC

SUBJECT TO COVENANTS, CONDITIONS, AND RESTRICTIONS PER
58 64
0212105021, 0212105025, 0212175219, ORKC
0215155000, 0211035794, 0215067184, 0212066536,
0215155003, 0210087115, 0215154987, 0215154991,
0201047284, 0202019503, 0210087114, 0215154992,
0195073472, 0195087081, 0196004988, 0201046884,

SUBJECT TO OIL, GAS, MINERAL LEASE PER INSTRUMENT
65 0196038146, ORKC
SUBJECT TO CONSENT TO REMOVAL OF CROPS PER INST NO.

EXCEPT E. 122.23 FEET)
1982-017377 BK. 5481, PG. 885 (NE 1/4 OF THE NE 1/4

SUBJECT TO OIL, GAS, MINERAL LEASE PER INSTRUMENT
65645849
381272
374, PG 413, ORKC

PUBLIC HIGHWAY PER BK
80' EASEMENT FOR
S
EE

M
A
P

R
W
-
M
6611
FB-15-0222-3
FB-15-0225-3FB-15-0225-3
FB-15-0222-3
S
EE

M
A
P

R
W
-
T
6612
SEE MAP RW-T6620
65645849
381272
FB-15-0222-1
FB-15-0222-2
FB-15-0222-1
CITY OF WASCO ROW TRANSFER AGREEMENT CONSTRUCTION PACKAGE 4 - EXHIBIT A

EXISTING FEE (TRANSFER OF FEE PROPERTY FROM CITY TO STATE)

EXISTING FEE (TRANSFER OF FEE PROPERTY FROM CITY TO STATE - CITY RESERVES STREET RIGHTS)

REPLACEMENT RIGHT OF WAY (TRANSFER OF FEE PROPERTY FROM STATE TO CITY)

REPLACEMENT RIGHT OF WAY (STATE TRANSFERS CITY STREET RIGHTS ONLY)

SUPERCEDED EXISTING CITY RIGHT OF WAY TO MITIGATE (CITY VACATES PUBLIC ROW, TRANSFER OF FEE PROPERTY FROM CITY TO STATE)

SUPERCEDED EXISTING CITY RIGHT OF WAY TO VACATE (CITY VACATES PUBLIC ROW TO BE VACATED OR DISPOSED OF BY CITY)

EXISTING CITY OWNED EASEMENT (CITY VACATES PUBLIC ROW FOR PROJECT) 23 /
0 6
/
2 017

B
N
S
F

R
O
W
DIRT
DIRT
CONC
CO NC
W
A
S
C
O

AV
E
"JST" 0+00.00 PI
SHEET NO.TOTAL SHEETS

DATE REVISION S BY

DATE REVISION S BY

DATE REVISION S BYDATE REVISION S BY
DWG No.

FRESNO TO BAKERSFIELD

CALIFORNIA HIGH-SPEED TRAIN PROJECT

PMCONTRACT
SURVEYO R IN CHA RGE:

NOTES
LEGEND
(R)
LEGEND
dpoulson 9/8/2022 11:53:13 AMCHSR-ROW-Appraisal.tblCHSR-ROW-PDF_half.pltY:\Jobs\21303 CHSR CP 4 Team B\MicroStation FB Maps\Agreem ent Exhibits\City of Wasco\4S-RW-T6620-Z5.dgn TO OBTAIN GROUND LEVEL DISTANCES.

MULTIPLY DISTANCES BY 1.000066514
(T)
SF
S.P.R.R.

DISTANCES.

DISTANCES AND STATIONING ARE GRID
SURVEY FEET.

EPOCH 2007.0. DISTANCES ARE U.S.

COORDINATE SYSTEM OF 1983, ZONE 4

ARE BASED ON THE CALIFORNIA

COORDINATES, BEARINGS AND DISTANCES
Southern Pacific Rail Rd
Square Feet
Total Distance
Radial Bearing
Required for Others
Title to State
Exist Property Line
Exist Easement Line
-SupersededHistoric R/W
Access Superseded
Access Prohibited
COUNTY
22CP4 KER

CITY OF WASCO

RIGHT OF WAY

TRANSFER AGREEMENT EXHIBIT
MAP NO. RW-T6620
RW-T6620 18
FEET 0 25 50 100 150
R
.
25 E
.

R
.
24 E
.

A
T
&
SF

R
/
W
J

S
T
R
EET

COMPRISE ONE LEGAL PARCEL
BOTH 0 7 2-2 4 0-0 4 & 0 7 2-2 4 0-0 5
AS SES SOR'S PAR CE L LINE O NLY:

PER BK 3122, PG 327, ORKC

TELEGRAPH COMPANY EASEMENT
10' PACIFIC TELEPHONE AND
SECTION 18
PER BK 5521 PG 1086 OR

UNDERGROUND COMMUNICATION FACILITIES

REPAIR, REPLACE, AND REMOVE

MAINTAIN, PLACE, OPERATE, INSPECT,
45' EASEMENT TO CONSTRUCT AND
PER BK. 6484, PG. 590, ORKC

ROAD AND OTHER MUNICIPAL USES
45' ROW FOR INGRESS, EGRESS,
BK 4300, PG 256, ORKC

HIGHWAY EASEMENT PER

EASEMENT NOTES
DESCRIPTIONNO.

BK 691, PG 251; BK 1151, PG 257

SUBJECT TO OIL, GAS, PETROLEUM, ETC RIGHTS PER
DEEDS
AN INSTRUMENT RECORDED IN BK 44 PG 287 ET SEQ. OF
PER BK 2, PG 40 OF AGREEMENTS, ORKC AND MODIFIED BY

SUBJECT TO CONTRACT OF SETTLEMENT OF WATER RIGHTS
AND WATER RIGHTS PER BK 691, PG 251, ORKC

TELEGRAPH LINES, AND ELECTRIC LIGHT AND POWER LINES,

FOR CANALS, DITCHES, ROAD, HIGHWAY, TELEPHONE AND

SUBJECT TO EASEMENTS, SERVITUDES AND RIGHTS OF WAY
NO. DESCRIPTION

CITY OF WASCO
T.2 7S. R.2 5E. M. D. M.

SECTION 7
1606 PG 208, ORKC

ROADWAY PER BK
80' EASEMENT FOR
PG. 2041, ORKC
SUBJECT TO WASCO REDEVELOPMENT PROJECT PER BK. 6153,
37 PG. 411 ORKC
SUBJECT TO POLE LINE AND ELECTRICAL EASEMENT PER BK.

PER BK. 1842 PG. 117 ORKC

SUBJECT TO COVENANTS, CONDITIONS AND RESTRICTIONS
PG 214 OR, EXACT LOCATION UNKNOWN
50' WIDE EASEMENT FOR SUB LATERAL CANALS PER BK 128
PG. 1507
2001-133484, 2011-121697, BK. 5481, PG. 893 & BK. 5488,

SUBJECT TO OIL, GAS, MINERAL LEASE PER INSTRUMENT
37 PG. 411 ORKC
SUBJECT TO POLE LINE AND ELECTRICAL EASEMENT PER BK.
0202019503, 0208119038, 0211079794, ORKC
SUBJECT TO OIL AND GAS LEASE PER INSTRUMENT NO.

BK 1151, PG 260, ORKC
SUBJECT TO OIL, GAS, MINERAL LEASE PER BK 691, PG 251;
0202019581, ORKC
SUBJECT TO OIL AND GAS LEASE PER INSTRUMENT NO.

PER BK 648, PG 201, ORKC

TELEGRAPHY LINES, AND ELECTRIC LIGHT AND POWER LINES

FOR CANALS, DITCHES, ROAD, HIGHWAY, TELEPHONE AND

SUBJECT TO EASEMENTS, SERVITUDES AND RIGHTS OF WAY
NO. 437, BK 4, PG 30, ORKC

SUBJECT TO RESERVATIONS PER HOMESTEAD CERTIFICATE
BK 44, PG 287, ORKC

SUBJECT TO COVENANTS, CONDITIONS, AND RESTRICTIONS PER
214, ORKC
SUBJECT TO CANAL EASEMENT, NOT PLOTTABLE, BK 128, PG
ORKC
SUBJECT TO GAS AND MINERAL LEASE PER BK 5927, PG 584,
413, ORKC
PER BK 374, PG

PUBLIC HIGHWAY
80' EASEMENT FOR
54 57
58 49
52 37
38 53
62 63
60 59
1523, PG 483, ORKC
SUBJECT TO OIL, GAS, ASPHALTUM, ETC. RIGHTS PER BK.
1606, PG 208, ORKC
SUBJECT TO OIL, GAS, ASPHALTUM, ETC. RIGHTS PER BK.
50 49 52 53
57 58 59
37 3832
49 50
INCIDENTAL THERETO PER BK 691 PG 251
30' ROAD EASEMENT AND RIGHTS
RIGHTS PER BK 2, PG 40 OF AGREEMENTS, ORKC

SUBJECT TO CONTRACT OF SETTLEMENT OF WATER
(NE 1/4 OF THE NE 1/4 EXCEPT E. 122.23 FEET)
1982-017377 BK. 5481, PG. 885

SUBJECT TO OIL, GAS, MINERAL LEASE PER INSTRUMENT
0212105021, 0212105025, 0212175219, ORKC
0215155000, 0211035794, 0215067184, 0212066536,
0215155003, 0210087115, 0215154987, 0215154991,
0201047284, 0202019503, 0210087114, 0215154992,
0195073472, 0195087081, 0196004988, 0201046884,

SUBJECT TO OIL, GAS, MINERAL LEASE PER INSTRUMENT
64 0196038146, ORKC
SUBJECT TO CONSENT TO REMOVAL OF CROPS PER INST NO. 65
65645849
38 38 58
53 59
52 57 58
49 BK 4 3 1 6, PG 7 3 5, ORKC
HIG HWA YS PER D OC. 5 9 9 5 8,

EASEMENT FOR PUBLIC
S
EE

M
A
P

R
W
-
M
6613
SEE MAP RW-T6618
251
THERETO PER BK 691 PG

RIGHTS INCIDENTAL
30' ROAD EASEMENT AND
PG. 1798 ORKC
OTHER MUNICIPAL PURPOSES PER BK. 6487,
45' ROW FOR INGRESS, EGRESS, ROAD AND
FB-15-0222-1

POSO DRIVE

S
EE

M
A
P

R
W
-
T
6612
SEE MAP RW-T6619
SEC. 1 2
SEC. 1 3
256, ORKC
BK 4300, PG

EASEMENT PER

HIGHWAY
7 15
20 21
32 36
7 54 60 62 63
36 36
2 12
1272
36 FB-15-0208-1
CITY OF WASCO ROW TRANSFER AGREEMENT CONSTRUCTION PACKAGE 4 - EXHIBIT A

EXISTING FEE (TRANSFER OF FEE PROPERTY FROM CITY TO STATE)

EXISTING FEE (TRANSFER OF FEE PROPERTY FROM CITY TO STATE - CITY RESERVES STREET RIGHTS)

REPLACEMENT RIGHT OF WAY (TRANSFER OF FEE PROPERTY FROM STATE TO CITY)

REPLACEMENT RIGHT OF WAY (STATE TRANSFERS CITY STREET RIGHTS ONLY)

SUPERCEDED EXISTING CITY RIGHT OF WAY TO MITIGATE (CITY VACATES PUBLIC ROW, TRANSFER OF FEE PROPERTY FROM CITY TO STATE)

SUPERCEDED EXISTING CITY RIGHT OF WAY TO VACATE (CITY VACATES PUBLIC ROW TO BE VACATED OR DISPOSED OF BY CITY)

EXISTING CITY OWNED EASEMENT (CITY VACATES PUBLIC ROW FOR PROJECT) SEC. 7
SEC. 1 8
ASPH
DIRT
ASPH
R
U
I
N
'
S
RUIN
T
T
T

WASCO A VE
J
A
C
K
S
ON

AV
E

CENTRAL V AL L EY HWY
ASPH
AS PH
UB
TRAIL

CENTRAL V AL L EY HWY
1566 0+00
1 5 6 6 5+0 0
1 5 6 7 0+0 0
156 7 5+00
1 5 6 8 5+0 0
BNSF 7304
BNSF ML-01
BNSF 7303
SHEET NO.TOTAL SHEETS
D

ATE REVISI
ON
S B
Y
D

ATE REVISI
ON
S B
Y
D

ATE REVISI
ON
S B
YD

ATE REVISI
ON
S B
Y
DWG No.

FRESNO TO BAKERSFIELD

CALIFORNIA HIGH-SPEED TRAIN PROJECT

PMCONTRACT

SURVEYO R I
N

C
HA
R
G
E
:

NOTES
LEGEND
(R)
LEGEND
d
p
o
u
ls
o
n
9 /
1 4
/
2 02
2 1
:2
3 :0
1 P
M
C
H
S
R
-
R
O
W
-
A
p
p
r
a
is
a
l.t
b
l
C
H
S
R
-
R
O
W
-
P
D
F
_
h
a
lf
.p
lt
Y
:\
J
o
b
s
\
21 3
0 3

C
H
S
R

C
P

4 T
e
a
m
B
\
M
ic
r
o
S
t
a
t
io
n

F
B

M
a
p
s
\
A
g
r
e
e
m
e
n
t

E
x
h
ib
it
s
\
C
it
y

o
f

W
a
s
c
o
\
4 S
-
R
W
-
T
67 0
0 -
Z
5 .dg
n
TO OBTAIN GROUND LEVEL DISTANCES.

MULTIPLY DISTANCES BY 1.000066514
(T)
SF
S.P.R.R.

DISTANCES.

DISTANCES AND STATIONING ARE GRID
SURVEY FEET.

EPOCH 2007.0. DISTANCES ARE U.S.

COORDINATE SYSTEM OF 1983, ZONE 4

ARE BASED ON THE CALIFORNIA

COORDINATES, BEARINGS AND DISTANCES
Southern Pacific Rail Rd
Square Feet
Total Distance
Radial Bearing
Required for Others
Title to State
Exist Property Line
Exist Easement Line
-SupersededHistoric R/W
Access Superseded
Access Prohibited
COUNTY
22CP4 KER

CITY OF WASCO

RIGHT OF WAY

TRANSFER AGREEMENT EXHIBIT
T.27S. R.25E. M.D.M.

MAP NO. RW-T6700
S
EE

M
A
P

R
W
-
T
67 0
1 FOURTH HOME EXTENSION COLONY
T.27S. R.24E. M.D.M.

T.27S. R.25E. M.D.M.

T.27S. R.24E. M.D.M.

E 6,165,617.784
N 2,397,311.903

FD COTTON SPINDLE
NE COR. OF SEC. 24-27/24
287.7 19RW-T6700
S
EE

M
A
P

R
W
-
T
6620
FEET 0 50 100 200 300
LIMITS

WASCO CITY
CITY OF WASCO ROW TRANSFER AGREEMENT CONSTRUCTION PACKAGE 4 - EXHIBIT A

EXISTING FEE (TRANSFER OF FEE PROPERTY FROM CITY TO STATE)

EXISTING FEE (TRANSFER OF FEE PROPERTY FROM CITY TO STATE - CITY RESERVES STREET RIGHTS)

REPLACEMENT RIGHT OF WAY (TRANSFER OF FEE PROPERTY FROM STATE TO CITY)

REPLACEMENT RIGHT OF WAY (STATE TRANSFERS CITY STREET RIGHTS ONLY)

SUPERCEDED EXISTING CITY RIGHT OF WAY TO MITIGATE (CITY VACATES PUBLIC ROW, TRANSFER OF FEE PROPERTY FROM CITY TO STATE)

SUPERCEDED EXISTING CITY RIGHT OF WAY TO VACATE (CITY VACATES PUBLIC ROW TO BE VACATED OR DISPOSED OF BY CITY)

EXISTING CITY OWNED EASEMENT (CITY VACATES PUBLIC ROW FOR PROJECT) LOT 129
LOT 128LOT 115
43 1 OR 9 9
ROS O.R. 14-63
SECTION 24
ROS NO.2760 O.R. 26-30
SECTION 19
SECTION 18
SECTION 13
SECTIO N 1 3
SECTION 1 8

WASCO AVENUE

BNSF RAILROAD

JACKSON AVE

JACKSON AVE

BNSF RAILROAD
HST "S" LINE
E 6,164,916.809
N 2,397,322.342

EXISTIN G R/W
FILED IN 11-1A FH BK: 1 MIN. PG: 99

FOURTH HOME EXTENSION COLONY MAP
40' PUBLIC ROAD EASEMENT PER
FILED AS 11-2 K.C.L.C. 27/25-19 MI
SECTION 19, T.27S. R.25E. M.D.B.&M.

SALES MAP OF LANDS OF K.C.L.C. IN
30' PUBLIC ROAD EASEMENT PER
PER F.O.C. NO. 125540, PER 4923 OR 728

CONDEMED TO THE STATE OF CALIFORNIA
PER RELINQUISHMENT NO. 79304, PER 4914 OR 966

RELINQUITED TO THE COUNTTY OF KERN
PER RESOLUTION NO. 05-47, ANNEX NO. 35

PUBLIC FEE ROAD ADOPTED BY THE CITY OF WASCO
PER 1341 OR 210
60' PUBLIC ROAD EASEMENT
STAMPED "CDOT"
FD 2" B.C.

FB-15-0302-01-01
AS PH
D
I
R
T
CONC
AS PH
ASPH
RS
RS
RS
DIRT
AS PH
TRAIL

UB UBUB

CENTRAL V AL L E
Y HWY

WASCO A VE
AS PH
AS PH

CENTRAL V AL L EY HWY

WASCO AV
E
1 56 8 5+00
15 690+00
15 6 95+0 0
1 5 7 0 0
+0 0
1 5 7 0 5
+0 0
1 5 7 1 0
+0 0
1 5 7 1 5
+0 0
BNSF ML-01
BNSF 7303
BNSF ML-01
SHEET NO.TOTAL SHEETS

DATE REVISION S BY

DATE REVISION S BY

DATE REVISION S BYDATE REVISION S BY
DWG No.

FRESNO TO BAKERSFIELD

CALIFORNIA HIGH-SPEED TRAIN PROJECT

PMCONTRACT
SURVEYO R IN CHA RGE:

NOTES
LEGEND
(R)
LEGEND
dpoulson 9/8/2022 11:56:14 AMCHSR-ROW-Appraisal.tblCHSR-ROW-PDF_half.pltY:\Jobs\21303 CHSR CP 4 Team B\MicroStation FB Maps\Agreem ent Exhibits\City of Wasco\4S-RW-T6701-Z5.dgn TO OBTAIN GROUND LEVEL DISTANCES.

MULTIPLY DISTANCES BY 1.000066514
(T)
SF
S.P.R.R.

DISTANCES.

DISTANCES AND STATIONING ARE GRID
SURVEY FEET.

EPOCH 2007.0. DISTANCES ARE U.S.

COORDINATE SYSTEM OF 1983, ZONE 4

ARE BASED ON THE CALIFORNIA

COORDINATES, BEARINGS AND DISTANCES
Southern Pacific Rail Rd
Square Feet
Total Distance
Radial Bearing
Required for Others
Title to State
Exist Property Line
Exist Easement Line
-SupersededHistoric R/W
Access Superseded
Access Prohibited
COUNTY
22CP4 KER

CITY OF WASCO

RIGHT OF WAY

TRANSFER AGREEMENT EXHIBIT
HST "S" LINE
1 OR 9 9
MAP NO. RW-T6701
R
O
S

NO
.
2760

O
.

R
.
26 -
30 SEE MAP RW-T6700
SEE MAP RW-T6702

EASEMENT

FOURTH HOME EXTENSION COLONY T.27S. R.24E. M.D.M.
24SECTION
T.27S. R.25E. M.D.M.

SECTION 19
SECTIO N 1 9
SECTION 24
E 6,165,562.120
N 2,394,673.728
FILED AS 11-2 K.C.L.C. 27/25-19 MI
SECTION 19, T.27S. R.25E. M.D.B.&M.

SALES MAP OF LANDS OF K.C.L.C. IN
60' PUBLIC ROAD EASMENET PER
FILED AS 11-2 K.C.L.C. 27/25-19 MI
SECTION 19, T.27S. R.25E. M.D.B.&M.

SALES MAP OF LANDS OF K.C.L.C. IN
30' PUBLIC ROAD EASEMENT PER
PER 7 3 OR 8 3

RIG HT-OF-WA Y

RAILRO A D FE E
PER 4 7 6 4 OR 8 8 7GRA NT ED TO THE STAT E OF CALIFORNIA PER 4 9 14 OR 96 6PER RE LINQUISHMENT N O. 7 9 304,

RE LIN Q UISHED TO THE COU NTY OF KERN
60' PUBLIC FE E RO AD
FD 2" I.P. TAGGED LS 17564
W 1/4 COR. OF SEC. 19-27/25
288.2 RW-T6701 20
FEET 0 50 100 200 300

E 6,168,503.903
N 2,394,648.236

W/ FEATHER

FD COTTON SPINDLE
CTR. 1/4 COR. OF SEC. 19-27/25

LIMITS

WASCO CITY
CITY OF WASCO ROW TRANSFER AGREEMENT CONSTRUCTION PACKAGE 4 - EXHIBIT A

EXISTING FEE (TRANSFER OF FEE PROPERTY FROM CITY TO STATE)

EXISTING FEE (TRANSFER OF FEE PROPERTY FROM CITY TO STATE - CITY RESERVES STREET RIGHTS)

REPLACEMENT RIGHT OF WAY (TRANSFER OF FEE PROPERTY FROM STATE TO CITY)

REPLACEMENT RIGHT OF WAY (STATE TRANSFERS CITY STREET RIGHTS ONLY)

SUPERCEDED EXISTING CITY RIGHT OF WAY TO MITIGATE (CITY VACATES PUBLIC ROW, TRANSFER OF FEE PROPERTY FROM CITY TO STATE)

SUPERCEDED EXISTING CITY RIGHT OF WAY TO VACATE (CITY VACATES PUBLIC ROW TO BE VACATED OR DISPOSED OF BY CITY)

EXISTING CITY OWNED EASEMENT (CITY VACATES PUBLIC ROW FOR PROJECT) LOT 143LOT 142LOT 129
P
R
O
S
P
E
C
T

AV
E

WASCO A VEN UE

BNS F RAILROA D

EXISTIN G R/W

WASCO A VEN UE
43 RSRS
F P
AS P
H
ASPH
ASPH
DIRT
DIRT
A
SP
H
TS
TS
UB
UB
DP
DP
TS
TS
TS
TS
TS
TS
UB

CENTRAL V AL L EY HWY

CENTRAL V AL L EY HWY

WASCO AV
E
15 715+00
157 20+00
SHEET NO.TOTAL SHEETS

DATE REVISION S BY

DATE REVISION S BY

DATE REVISION S BYDATE REVISION S BY
DWG No.

FRESNO TO BAKERSFIELD

CALIFORNIA HIGH-SPEED TRAIN PROJECT

PMCONTRACT
SURVEYO R IN CHA RGE:

NOTES
LEGEND
(R)
LEGEND
dpoulson 9/8/2022 11:58:35 AMCHSR-ROW-Appraisal.tblCHSR-ROW-PDF_half.pltY:\Jobs\21303 CHSR CP 4 Team B\MicroStation FB Maps\Agreem ent Exhibits\City of Wasco\4S-RW-T6702-Z5.dgn TO OBTAIN GROUND LEVEL DISTANCES.

MULTIPLY DISTANCES BY 1.000066514
(T)
SF
S.P.R.R.

DISTANCES.

DISTANCES AND STATIONING ARE GRID
SURVEY FEET.

EPOCH 2007.0. DISTANCES ARE U.S.

COORDINATE SYSTEM OF 1983, ZONE 4

ARE BASED ON THE CALIFORNIA

COORDINATES, BEARINGS AND DISTANCES
Southern Pacific Rail Rd
Square Feet
Total Distance
Radial Bearing
Required for Others
Title to State
Exist Property Line
Exist Easement Line
-SupersededHistoric R/W
Access Superseded
Access Prohibited
COUNTY
22CP4 KER

CITY OF WASCO

RIGHT OF WAY

TRANSFER AGREEMENT EXHIBIT
HST "S" LINE
MAP NO. RW-T6702
SEE MAP RW-T6701
SEE MAP RW-T6703
43 PER 2538
OR 90
20 ' PIPE L

INE EASEMENT
PER 2538
OR 90
15 ' PIPE L

INE EASEMENT

PER D O
C. N O
. 0199143773
55' PUBLIC RO A

D EASEMENT
PER 4764
OR 887
GRAN

TED TO THE STATE

OF CALIFORNIA
NO
.
7930
4, PER 4914
OR 966
COUN

TY OF KERN PER REL
INQ

UISHMENT
60 ' PUBLIC FEE
ROAD
REL
INQU

ISHED TO THE
PER 73
OR 83
RIG H

T-OF-WA Y

RAILRO A D
FE E
288.7 21RW-T6702
FEET 0 50 100 200 300
PER 656 OR 390
80' CANAL EASEMENT
LIMITS

WASCO CITY
LIMITS

WASCO CITY
S P
HERE of

INFLUENCE BO U N
DARY
CITY of WASCO
CITY OF WASCO ROW TRANSFER AGREEMENT CONSTRUCTION PACKAGE 4 - EXHIBIT A

EXISTING FEE (TRANSFER OF FEE PROPERTY FROM CITY TO STATE)

EXISTING FEE (TRANSFER OF FEE PROPERTY FROM CITY TO STATE - CITY RESERVES STREET RIGHTS)

REPLACEMENT RIGHT OF WAY (TRANSFER OF FEE PROPERTY FROM STATE TO CITY)

REPLACEMENT RIGHT OF WAY (STATE TRANSFERS CITY STREET RIGHTS ONLY)

SUPERCEDED EXISTING CITY RIGHT OF WAY TO MITIGATE (CITY VACATES PUBLIC ROW, TRANSFER OF FEE PROPERTY FROM CITY TO STATE)

SUPERCEDED EXISTING CITY RIGHT OF WAY TO VACATE (CITY VACATES PUBLIC ROW TO BE VACATED OR DISPOSED OF BY CITY)

EXISTING CITY OWNED EASEMENT (CITY VACATES PUBLIC ROW FOR PROJECT)

COUNTY OF KERN
1 8 P.M. 5 3
PAR CE L MAP 3 7 7 2 K
IM
B
E
R
L
INA

AV
E
NU
E
WASCO
AV
E
T.27S. R.25E. M.D.M.

SECTION 30
SECTIO N 3 0
SECTION 25
SECTION 24
SECTIO N 1 9
SECTION 25
T.27S. R.24E. M.D.M.

BNS F

RAILRO A D
E 6,165,506.264
N 2,407,235.707

EXISTING R/W
PER 2569 OR 152
65' PIPELINE EASEMENT
PER 2538 OR 90
55' PIPELINE EASEMENT
FD 2" B.C. IN CONC. IN MON. WELL
NE 1/4 COR. OF SEC. 25-27/24
FB-15-XXXX-X
PER 5 MIN. 588
NO. 124 MAP DECLARED OPEN

PER PROPOSED COUNTY ROAD
60' PUBLIC ROAD EASEMENT

CITY OF WASCO
A
SP
H
ASPH
DIRT
DIRT
DIRT
UB
DP

TA N KS
AS PH
CO NC
D
I
R
T
ASP
H
K
I
M
B
E
R
L
I
NA

R
D
1 5 7 1 5
+0 0
1 5 7 2 0
+0 0
15 725+00
1 5 7 3 0
+0 0
15 7 3 5
+0 0
15740+00
BNS F
ML-0 1
SHEET NO.TOTAL SHEETS

DATE REVISION S BY

DATE REVISION S BY

DATE REVISION S BYDATE REVISION S BY
DWG No.

FRESNO TO BAKERSFIELD

CALIFORNIA HIGH-SPEED TRAIN PROJECT

PMCONTRACT
SURVEYO R IN CHA RGE:

NOTES
LEGEND
(R)
LEGEND
dpoulson 9/8/2022 11:59:44 AMCHSR-ROW-Appraisal.tblCHSR-ROW-PDF_half.pltY:\Jobs\21303 CHSR CP 4 Team B\MicroStation FB Maps\Agreem ent Exhibits\City of Wasco\4S-RW-T6703-Z5.dgn TO OBTAIN GROUND LEVEL DISTANCES.

MULTIPLY DISTANCES BY 1.000066514
(T)
SF
S.P.R.R.

DISTANCES.

DISTANCES AND STATIONING ARE GRID
SURVEY FEET.

EPOCH 2007.0. DISTANCES ARE U.S.

COORDINATE SYSTEM OF 1983, ZONE 4

ARE BASED ON THE CALIFORNIA

COORDINATES, BEARINGS AND DISTANCES
Southern Pacific Rail Rd
Square Feet
Total Distance
Radial Bearing
Required for Others
Title to State
Exist Property Line
Exist Easement Line
-SupersededHistoric R/W
Access Superseded
Access Prohibited
COUNTY
22CP4 KER

CITY OF WASCO

RIGHT OF WAY

TRANSFER AGREEMENT EXHIBIT
HST "S" LINE
MAP NO. RW-T6703
SEE MAP RW-T6702
SEE MAP RW-T6701

DECLARED OPEN PER 5 MIN. 588
PROPOSED COUNTY ROAD NO. 124 MAP
60' PUBLIC ROAD EASEMENT PER
PER 2440 OR 444
20' PIPELINE EASMENT
PER DOC. NO. 0199143773
55' PUBLIC ROAD EASEMENT
PER 2440 OR 444
55' PIPELINE EASEMENT
PER 656 OR 390
80' CANAL EASEMENT
PER 73
OR 83
RIG H

T-OF-WAY

RAILRO A D
FE E
288.8 RW-T6703 22
FEET 0 50 100 200 300
LIMITS

WASCO CITY

INFLUENCE BOUNDARY
SPHERE of
CITY of WASCO
CITY OF WASCO ROW TRANSFER AGREEMENT CONSTRUCTION PACKAGE 4 - EXHIBIT A

EXISTING FEE (TRANSFER OF FEE PROPERTY FROM CITY TO STATE)

EXISTING FEE (TRANSFER OF FEE PROPERTY FROM CITY TO STATE - CITY RESERVES STREET RIGHTS)

REPLACEMENT RIGHT OF WAY (TRANSFER OF FEE PROPERTY FROM STATE TO CITY)

REPLACEMENT RIGHT OF WAY (STATE TRANSFERS CITY STREET RIGHTS ONLY)

SUPERCEDED EXISTING CITY RIGHT OF WAY TO MITIGATE (CITY VACATES PUBLIC ROW, TRANSFER OF FEE PROPERTY FROM CITY TO STATE)

SUPERCEDED EXISTING CITY RIGHT OF WAY TO VACATE (CITY VACATES PUBLIC ROW TO BE VACATED OR DISPOSED OF BY CITY)

EXISTING CITY OWNED EASEMENT (CITY VACATES PUBLIC ROW FOR PROJECT)

COUNTY OF KERN
S
E
C
T
ION

30 S
E
C
T
ION

1 9
K
IM
B
E
R
L
INA

AV
E
NU
E
INST
N O.
000214138768
LOT
LINE

A DJUSTMENT
N O.
39-13
T.27S. R.25E. M.D.M.

SECTION 30
WASCO

CITY OF

COUNTY OF KERN

← All documents from this meeting