CITY OF WEST COVINA
CITY COUNCIL/SUCCESSOR AGENCY
FEBRUARY 6, 2024, 7:00 PM
REGULAR MEETING
CITY HALL COUNCIL CHAMBERS
1444 W. GARVEY AVENUE SOUTH
WEST COVINA, CALIFORNIA 91790
Mayor Brian Calderón Tabatabai
Mayor Pro Tem Tony Wu
Councilwoman Letty Lopez-Viado
Councilman Ollie Cantos
Councilwoman Rosario Diaz
Please turn off all cell phones and other electronic devices prior to entering the Council Chambers
AMERICANS WITH DISABILITIES ACT
The City complies with the Americans with Disabilities Act (ADA). If you will need special assistance at Council meetings, please call (626) 939-8433 (voice) or (626) 960-4422 (TTY) from 8 to 5 Monday through Thursday. Do call at least one day prior to the meeting date to inform us of your particular needs and to determine if accommodation is possible. For sign language interpreter services at Council meetings, please request no less than four working days prior to the meeting.
AGENDA MATERIAL
Agenda material is available for review at the City Clerk's Office, Room 317 in City Hall, 1444 W. Garvey Avenue South, West Covina and at www.westcovina.org. Any writings or documents regarding any item on this agenda, not exempt from public disclosure, provided to a majority of the City Council that is distributed less than 72 hours before the meeting, will be made available for public inspection in the City Clerk’s Office, Room 317 of City Hall located at 1444 W. Garvey Avenue South, West Covina, during normal business hours.
NOTICE
The City Council will regularly convene on the first and third Tuesday of the month. The West Covina Community Development Commission, West Covina Public Financing Authority and the West Covina Community Services Foundation are agencies on which the City Council serves as members. Agendas may contain items for these boards, as necessary.
PUBLIC COMMENTS
ADDRESSING THE CITY COUNCIL
(Per WCMC 2-48, Ordinance No. 2150)
Any person wishing to address the City Council on any matter listed on the agenda or on any other matter within their jurisdiction should complete a speaker card that is provided at the entrance to the Council Chambers and submit the card to the City Clerk.
Please identify on the speaker card whether you are speaking on an agenda item or non-agenda. Requests to speak on agenda items will be heard prior to requests to speak on non-agenda items. All comments are limited to five (5) minutes per speaker.
Oral Communications may be limited to thirty (30) minutes, unless speakers addressing agenda items have not concluded.
Any testimony or comments regarding a matter set for a Public Hearing will be heard during the hearing.
RULES OF DECORUM
Excerpts from the West Covina Municipal Code and Penal Code pertaining to the Rules of Decorum will be found at the end of agenda.
AGENDA
AGENDA
CITY OF WEST COVINA
CITY COUNCIL/SUCCESSOR AGENCY
TUESDAY FEBRUARY 6, 2024, 7:00 PM
REGULAR MEETING
INVOCATION
Led by Pastor Jillian Lutes from West Covina Hills Seventh Day Adventist Church
PLEDGE OF ALLEGIANCE
Led by Councilwoman Lopez-Viado
ROLL CALL
REPORTING OUT FROM CLOSED SESSION
PRESENTATIONS
Recognizing Sergeant Hernandez for his Courageous Actions on January 17, 2024
CITY MANAGER'S REPORT
City Manager's report on current City projects.
ORAL COMMUNICATIONS - Five (5) minutes per speaker
Please step forward to the podium and state your name and city of residence for the record when recognized by the Mayor.
CONSENT CALENDAR
All matters listed under CONSENT CALENDAR are considered to be routine and can be acted on by one roll call vote. There will be no separate discussion of these items unless members of the City Council/Community Development Commission request specific items to be removed from the Consent Calendar for separate discussion or action.
APPROVAL OF MEETING MINUTES
1) CONSIDERATION OF APPROVAL OF THE JANUARY 16, 2024, CITY
COUNCIL/SUCCESSOR AGENCY REGULAR SESSION MEETING MINUTES AND THE JANUARY 16, 2024, CITY COUNCIL/SUCCESSOR AGENCY REGULAR CLOSED SESSION MEETING MINUTES.
That the Council approve the January 16, 2024, City Council/Successor Agency Regular Session Meeting Minutes and the January 16, 2024, City Council/Successor Agency Regular Closed Session Meeting Minutes.
CITY MANAGER'S OFFICE
2) CONSIDERATION OF APPOINTMENTS OF COUNCIL MEMBERS TO SERVE ON VARIOUS
ADVISORY BOARDS AND COMMITTEES
Staff recommends that the City Council adopt the following resolution:
Staff recommends that the City Council adopt the following resolution:
RESOLUTION NO. 2024-10 - A RESOLUTION OF THE CITY COUNCIL OF THE CITY
OF WEST COVINA, CALIFORNIA, CONFIRMING APPOINTMENTS OF COUNCIL
MEMBERS TO SERVE ON VARIOUS ADVISORY BOARDS AND COMMITTEES 3) CONSIDERATION OF CANCELATION OF THE MARCH 5, 2024 COUNCIL MEETING It is recommended that the City Council cancel the March 5, 2024 City Council meeting. 4) CONSIDERATION OF COMMISSIONER APPOINTMENT TO THE COMMUNITY AND
SENIOR SERVICES COMMISSION
It is recommended that the City Council receive and file this informational report.
COMMUNITY DEVELOPMENT
5) CONSIDERATION OF APPROVAL OF TRAFFIC RECOMMENDATIONS FROM THE TRAFFIC COMMITTEE MEETINGS BETWEEN SEPTEMBER 2023 AND NOVEMBER 2023 It is recommended that the City Council approve the traffic recommendations listed in Attachment No. 1 for traffic engineering improvements citywide from the Traffic Committee Meetings held between September 2023 and November 2023. 6) CONSIDERATION OF ACCEPTANCE OF WORK FOR CORTEZ PARK SPORTS FIELD LIGHTING PROJECT - PROJECT NO. 22016
It is recommended that the City Council take the following actions:
Accept the work performed by F.E.C. Electric, Inc. for the Cortez Park Sports Field Lighting Project (Project No. 22016) with a final contract amount of $233,500.00;
1. Authorize the Acting City Manager and Assistant City Clerk to execute the Notice of Completion and file the Notice of Completion with the County of Los Angeles Registrar-Recorder; and
2. 3. Authorize the Acting City Manager to release retention funds once appropriate. 7) CONSIDERATION OF ACCEPTANCE OF WORK FOR CITYWIDE PEDESTRIAN & VEHICLE TRAFFIC SAFETY IMPROVEMENTS FY 22-23 - PROJECT NO. 23027 It is recommended that the City Council take the following actions:
Accept the work performed by Superior Pavement Markings, Inc. for the Citywide Pedestrian and Vehicle Safety Improvements FY 22-23 (Project No. 23027) with a final contract amount of $254,347.87;
1. Authorize the Acting City Manager and Assistant City Clerk to execute the Notice of Completion and file the Notice of Completion with the County of Los Angeles Registrar-Recorder; and
2. 3. Authorize the Acting City Manager to release a retention funds once appropriate.
FINANCE DEPARTMENT
8) CONSIDERATION OF RESOLUTION NO. 2024-2 REPEALING AND REPLACING THE
SALARY SCHEDULE FOR FULL-TIME CLASSIFICATIONS
It is recommended that the City Council adopt the following resolution:
RESOLUTION NO. 2024-2 - A RESOLUTION OF THE CITY COUNCIL OF THE CITY
OF WEST COVINA, CALIFORNIA, REPEALING AND REPLACING THE SALARY
SCHEDULE FOR FULL-TIME CLASSIFICATIONS OF THE CITY OF WEST COVINA
END OF CONSENT CALENDAR
HEARINGS
PUBLIC HEARINGS
9) PUBLIC HEARING REGARDING THE PROGRAM YEAR (PY) 2024 COMMUNITY
DEVELOPMENT BLOCK GRANT (CDBG) ACTION PLAN
It is recommended that the City Council:
1. Conduct a public hearing regarding the PY 2024 CDBG Action Plan; and Direct staff to develop a draft PY 2024 CDBG Action Plan, based on the needs and priorities approved for the PY 2020-2024 Consolidated Plan.
2. DEPARTMENTAL REGULAR MATTERS
COMMUNITY DEVELOPMENT
10) CONSIDERATION OF 2023 UPDATE TO THE PAVEMENT MANAGEMENT PROGRAM It is recommended that the City Council take the following actions:
1. Receive and file the Updated 2023 Pavement Management Program; and
2. Provide direction regarding whether to implement budget scenario 2 for the 5-year pavement program for a total budget of approximately $25.5 million over 5 years, or budget scenario 3 for the 5-year pavement program for a total budget of approximately $28.8 million over 5 years; and
3. Direct the City Manager to implement the plan.
MAYOR/COUNCILMEMBERS REPORTS
AB 1234 Conference and Meeting Report (verbal, if any)
(In accordance with AB 1234, Councilmembers shall make a brief report or file a written report on any meeting/event/conference attended at City expense.)
CITY COUNCIL REQUESTS FOR REPORTS, STUDIES OR INVESTIGATION (Per City of West Covina Standing Rules 4.f - Requests for reports, studies, or investigations that are not readily available must be placed on the City Council/Successor Agency agenda as items of business and must be approved by a majority of the City Council/Successor Agency Board.)
CITY COUNCIL COMMENTS
ADJOURNMENT
Next Tentative City Council Meeting
Regular Meeting February 20, 2024 7:00 PM
RULES OF DECORUM
The following are excerpts from the West Covina Municipal Code:
Sec. 2-48. Manner of addressing council; time limit; persons addressing may be sworn.
Each person addressing the council shall step up to the rostrum, shall give his or her name and city of residence in an audible tone of voice for the record and unless further time is granted by the council, shall limit his or her address to five (5) minutes. a.
b. The city council may establish a limit on the duration of oral communications.
All remarks shall be addressed to the council as a body and not to any member thereof. No person, other than the council and the person having the floor, shall be permitted to enter into any discussion, either directly or through a member of the council, without the permission of the presiding officer. No question shall be asked of a councilmember except through the presiding officer. c.
The presiding officer may require any person to be sworn as a witness before addressing the council on any subject. Any such person who, having taken an oath that he or she will testify truthfully, willfully and contrary to such oath states as true any material matter which he knows to be false may be held to answer criminally and subject to the penalty prescribed for perjury by the provisions of the Penal Code of the state.
d.
Sec. 2-50. Decorum--Required.
While the council is in session, the members shall preserve order and decorum, and a member shall neither, by conversation or otherwise, delay or disrupt the proceedings or the peace of the council nor interrupt any member while speaking or refuse to obey the orders of the council or its presiding officer, except as otherwise herein provided. a.
Members of the public shall not willfully disrupt the meeting or act in a manner that actually impairs the orderly conduct of the meeting.
For the purposes of this code, “willfully disrupt” includes, but is not limited to, continuing to do any of the following after being warned by the Mayor that continuing to do so will be a violation of the law:
a. Addressing the Mayor and City Council without first being recognized. b. Persisting in addressing a subject or subjects, other than that before the Mayor and City Council. c. Repetitiously addressing the same subject.
d. Failing to relinquish the podium when directed to do so.
From the audience, interrupting or attempting to interrupt, a speaker, the Mayor, a council member, or a staff member or shouting or attempting to shout over a speaker, the Mayor, a council member or a staff member. e.
As a speaker, interrupting or attempting to interrupt the Mayor, a council member, or a staff member, or shouting over or attempting to shout over the Mayor, a council member, or a staff member. Nothing in this section or any rules of the council shall be construed to prohibit public criticism of the policies, procedures, programs, or services of the City or of the acts or omissions of the City Council. It shall be unlawful to violate the provisions of this Section. f.
b.
If any subsection, sentence, clause, or phrase or word of this Section 2-50 is for any reason held to be invalid or unconstitutional, such decision shall not affect the validity of the remaining portions of this Section. The City Council hereby declares that it would have passed this section and each subsection, sentence, clause and phrase thereof, irrespective of the fact that any one or more subsections, sentences, clauses, phrases or words had been declared invalid or unconstitutional.
Sec. 2-52. Persons authorized to be within council area.
No person, except city officials, their representatives and members of the news media shall be permitted within the rail in front of the council chamber without the express consent of the council.
The following are excerpts from the Penal Code
148(a) (1) Every Person who willfully resists, delays, or obstructs any public officer, peace officer, or an emergency medical technician, as defined in Division 2.5 (commencing with Section 1797) of the Health and Safety code, in the discharge or attempt to discharge any duty of his or her office or employment, when no other punishment is prescribed, shall be punished by a fine not exceeding one thousand dollars ($1,000), or by imprisonment in a county jail not to exceed one year, or by both that fine and imprisonment. 403 Every person who, without authority of law, willfully disturbs or breaks up any assembly or meeting that is not unlawful in its character, other than an assembly or meeting referred to in Section 303 of the Penal Code or Section 18340 of the Elections Code, is guilty of a misdemeanor.
AGENDA ITEM NO. 1
AGENDA STAFF REPORT
City of West Covina | Office of the City Manager
DATE: February 6, 2024
TO: Mayor and City Council
FROM: Paulina Morales
Acting City Manager
SUBJECT: CONSIDERATION OF APPROVAL OF THE JANUARY 16, 2024, CITY
COUNCIL/SUCCESSOR AGENCY REGULAR SESSION MEETING MINUTES AND THE JANUARY 16, 2024, CITY COUNCIL/SUCCESSOR AGENCY REGULAR CLOSED SESSION MEETING MINUTES.
RECOMMENDATION:
That the Council approve the January 16, 2024, City Council/Successor Agency Regular Session Meeting Minutes and the January 16, 2024, City Council/Successor Agency Regular Closed Session Meeting Minutes.
DISCUSSION:
That the City Council adopt the attached minutes.
Prepared by: Lisa Sherrick; Assistant City Clerk
Attachments
Attachment No. 1 - 1/16/2024 Closed Session Minutes Draft Attachment No. 2 - 1/16/2024 Regular Session Minutes Draft CITY COUNCIL GOALS & OBJECTIVES: Enhance City Image and Effectiveness ATTACHMENT NO. 1
CITY OF WEST COVINA
CITY COUNCIL/SUCCESSOR AGENCY
JANUARY 16, 2024, 6:00 PM
REGULAR MEETING - CLOSED SESSION
MANAGEMENT RESOURCE CENTER 3RD FLOOR
1444 W. GARVEY AVENUE SOUTH
WEST COVINA, CALIFORNIA 91790
Mayor Brian Calderón Tabatabai
Mayor Pro Tem Tony Wu
Councilwoman Letty Lopez-Viado
Councilman Ollie Cantos
Councilwoman Rosario Diaz
MINUTES
CALL TO ORDER
A Regular Session Meeting was called to order by Mayor Calderón Tabatabai on Tuesday, January 16, 2024, at 6:00 p.m., in the Council Chambers, 1444 West Garvey Avenue South, West Covina, California.
ROLL CALL
Council Members
Present: Council Members Rosario Diaz, Ollie Cantos (Arrived at 6.07 PM), Mayor Pro Tem Wu, Mayor Brian Calderón Tabatabai
Absent: Councilwoman Lopez Viado
ATTACHMENT NO. 1
City Staff: Paulina Morales, Acting City Manager, Thomas Duarte, City Attorney, Stephanie Sikkema, Finance Director and Interim Human Resources and Risk Management Director, Melissa Ballard, City Attorney.
PUBLIC COMMENTS ON ITEMS ON THE AGENDA
None
CLOSED SESSION
1. CONFERENCE WITH LEGAL COUNSEL - EXISTING LITIGATION - Pursuant to Government Code § 54956.9(d)(1)
1.Ronnie Parham vs. City of West Covina, et al, (United States District Court, Case No. 2:21-cv-09114-FLA-GJS)
2. CONFERENCE WITH LABOR NEGOTIATORS
Pursuant to Government Code § 54957.6
City Negotiators: Morales, Duarte
Employee Organizations
• Confidential Employees
• Maintenance & Crafts Employees
• Non-Sworn
• W.C. Police Officers’ Association
• W.C. Firefighters’ Management Assoc.
• W.C. Firefighters’ Association, I.A.F.F., Local 3226
• General Employees
• Mid-Management Employees
• W.C. Police Management Association
Unrepresented Employee Group
• Department Heads
REPORTING OUT
City Attorney Thomas Duarte reported that no action was taken during the Closed Session Meeting.
ADJOURNMENT
A motion to adjourn the Regular Closed Meeting was made by Mayor Calderón Tabatabai, and the meeting was adjourned at 6:55 p.m. The next regularly scheduled Regular Closed City Council Meeting will be held on Tuesday, February 6, 2024, at 7:00 p.m. in the Management Resource Center 3rd Floor, 1444 West Garvey Avenue South, West Covina, California.
Submitted By:
ATTACHMENT NO. 1
____________________________
Lisa Sherrick
Assistant City Clerk
__________________________
Brian Calderón Tabatabai
Mayor
Attachment No. 2
CITY OF WEST COVINA
CITY COUNCIL/SUCCESSOR AGENCY
JANUARY 16, 2024, 7:00 PM
REGULAR MEETING
CITY HALL COUNCIL CHAMBERS
1444 W. GARVEY AVENUE SOUTH
WEST COVINA, CALIFORNIA 91790
Mayor Brian Calderón Tabatabai
Mayor Pro Tem Tony Wu
Councilwoman Letty Lopez-Viado
Councilman Ollie Cantos
Councilwoman Rosario Diaz
MINUTES
CALL TO ORDER
A Regular Session Meeting was called to order by Mayor Brian Calderón Tabatabai on Tuesday, December 19, 2023, at 7:00 p.m., in the Council Chambers, 1444 West Garvey Avenue South, West Covina, California.
INVOCATION
Led by Pastor Mason Okubo from Immanuel First Church
PLEDGE OF ALLEGIANCE
Led by Councilman Cantos
Attachment No. 2
ROLL CALL
Present: Council Members Cantos, Diaz, Mayor Pro Tem Wu, Mayor Calderón Tabatabai
Absent: Councilwoman Lopez-Viado
REPORTING OUT FROM CLOSED SESSION
None
PRESENTATIONS
• Recognition of Retirement of Police Officer Sam Ling
CITY MANAGER'S REPORT
City Manager's report on current City projects.
ORAL COMMUNICATIONS - Five (5) minutes per speaker
John Shewmaker
Matthew Smith
R. Robinson
Ray Vargas
Jim Grivich
Gleen Kennedy
Bill Elliot
CONSENT CALENDAR
ACTION: Motion by Councilwoman Diaz Second by Mayor Pro Tem Wu, 4-0 to (Lopez-Viado: Absent): Approve Consent Calendar Items 1-5
APPROVAL OF MEETING MINUTES
1) CONSIDERATION OF APPROVAL OF THE DECEMBER 19, 2023, CITY
COUNCIL/SUCCESSOR AGENCY REGULAR SESSION MEETING MINUTES AND THE DECEMBER 19, 2023, CITY COUNCIL/SUCCESSOR AGENCY REGULAR CLOSED SESSION MEETING MINUTES.
Carried 4-0 to (Lopez-Viado: Absent): That the Council approve the December 19, 2023, City Council/Successor Agency Regular Session Meeting Minutes and the December 19, 2023, City Council/Successor Agency Regular Closed Session Meeting Minutes.
CITY MANAGER'S OFFICE
2) CONSIDERATION OF CHANGING ORDER OF BUSINESS FOR REGULAR CITY
COUNCIL MEETINGS
Attachment No. 2
Carried 4-0 to (Lopez-Viado: Absent):It is recommended that the City Council adopt the following resolution:
RESOLUTION NO. 2024-6 A RESOLUTION OF THE CITY COUNCIL OF THE
CITY OF WEST COVINA, CALIFORNIA, CHANGING THE ORDER OF
BUSINESS FOR REGULAR CITY COUNCIL MEETINGS
COMMUNITY DEVELOPMENT
3) CONSIDERATION OF REJECTION OF BIDS AND DIRECTOR TO READVERTISE FOR BIDS FOR FIRE STATIONS 2 AND 4 FLOORING REPLACEMENT PROJECT - PROJECT NO. 22010
Carried 4-0 to (Lopez-Viado: Absent): It is recommended that the City Council take the following actions:
1. Reject all bids received for the Fire Stations 2 and 4 Flooring Replacement Project as authorized by Section 2-354(6) of Division 3 of Article VII of Chapter 2 of the West Covina Municipal Code; and
2. Direct staff to re-advertise the project.
FIRE DEPARTMENT
4) CONSIDERATION OF AGREEMENT WITH LOCALITY MEDIA, INC. DBA FIRST
DUE TO FURNISH AND DELIVER A CLOUD/INTERNET BASED RECORDS
MANAGEMENT SOFTWARE (RMS)
Carried 4-0 to (Lopez-Viado: Absent): It is recommended that the City Council take the following actions:
1. In accordance with Section 2-335(10) of Division 2 of Article VII of Chapter 2 of the West Covina Municipal Code, find that compliance with the City's bidding requirements and procedures is not in the best interest of the City in connection with the procurement of cloud-based Records Management Software (RMS) because there is need for a customized all-in-one software solution that meets all the needs of the Fire Department; integrates with other City applications; and is utilized by mutual aid partners to ensure public safety, which the Fire Department indicates can only be provided by First Due.
2. Authorize the Acting City Manager to execute an Agreement for Services with Locality Media, Inc., DBA First Due (First Due).
Attachment No. 2
HUMAN RESOURCES/RISK MANAGEMENT
5) CONSIDERATION OF A SIDE LETTER OF AGREEMENT BETWEEN THE CITY AND THE WEST COVINA FIREFIGHTERS’ ASSOCIATION, I.A.F.F., LOCAL 3226 (WCFFA)
Carried 4-0 to (Lopez-Viado: Absent): It is recommended that the City Council adopt the following Resolution:
RESOLUTION NO. 2024-3 - A RESOLUTION OF THE CITY COUNCIL OF THE
CITY OF WEST COVINA, CALIFORNIA ADOPTING THE SIDE LETTER OF AGREEMENT BETWEEN THE CITY AND THE WEST COVINA FIREFIGHTERS’ ASSOCIATION, I.A.F.F., LOCAL 3226 (WCFFA)
END OF CONSENT CALENDAR
HEARINGS
PUBLIC HEARINGS
6) PUBLIC HEARING REGARDING DEVELOPMENT CODE UPDATE (CODE AMENDMENT NO. 23-01), INCLUDING ASSOCIATED INITIAL STUDY AND
NEGATIVE DECLARATION PURSUANT TO THE CALIFORNIA ENVIRONMENTAL QUALITY ACT, GENERAL PLAN AMENDMENT NO. 23-02, AND ORDINANCE NO. 2919 APPROVING THE DEVELOPMENT CODE UPDATE, AMENDING CHAPTERS 7, 15, 17, AND 24 OF THE WEST COVINA MUNICIPAL CODE, AND AMENDING
THE DOWNTOWN PLAN AND CODE
Public Comments in Favor
Cory Warshaw
Public Comments Neither in Favor nor Opposed
None
Public Comments in Opposition
R. Robinson
ACTION: Motion by Councilwoman Diaz, Second by Councilman Cantos 4-0 to (Lopez-Viado: Absent): Approve the following:
1. Conduct a public hearing;
Attachment No. 2
2. Adopt the following resolutions:
RESOLUTION NO. 2024-4 - A RESOLUTION OF THE CITY COUNCIL OF THE
CITY OF WEST COVINA, CALIFORNIA, ADOPTING THE NEGATIVE
DECLARATION FOR THE DEVELOPMENT CODE UPDATE (CODE
AMENDMENT NO. 23-01) PURSUANT TO THE CALIFORNIA
ENVIRONMENTAL QUALITY ACT
RESOLUTION NO. 2024-5 - A RESOLUTION OF THE CITY COUNCIL OF THE
CITY OF WEST COVINA, CALIFORNIA, APPROVING GENERAL PLAN AMENDMENT NO. 23-02 TO AMEND THE LAND USE ELEMENT TO CHANGE
THE LAND USE DESIGNATIONS OF CERTAIN PROPERTIES AND MAKING A
DETERMINATION THAT THE PROJECT IS EXEMPT FROM THE CALIFORNIA
ENVIRONMENTAL QUALITY ACT PURSUANT TO CEQA GUIDELINES
SECTION 15061(B)(3) (COMMON SENSE EXEMPTION); and
ACTION: Motion by Councilwoman Diaz, Second by Mayor Pro Tem Wu 4-0 to (Lopez-Viado: Absent): Introduce the following ordinance with an amendment to change cell towers to 1500 feet radius and undergrounding equipment:
ORDINANCE NO. 2519 - AN ORDINANCE OF THE CITY COUNCIL OF THE
CITY OF WEST COVINA, CALIFORNIA, APPROVING CODE AMENDMENT NO. 23-01, THE DEVELOPMENT CODE UPDATE, AMENDING CHAPTER 7 (BUILDINGS AND BUILDING REGULATIONS), CHAPTER 15
(MISCELLANEOUS PROVISIONS RELATING TO PUBLIC HEALTH, AND SAFETY), CHAPTER 17 (PLANNING), CHAPTER 19 (STREETS, SIDEWALKS, AND PUBLIC PLACES), AND CHAPTER 24 (VEGETATION) OF THE WEST
COVINA MUNICIPAL CODE, AND AMENDING THE DOWNTOWN PLAN AND CODE
MAYOR/COUNCILMEMBERS REPORTS
None
CITY COUNCIL REQUESTS FOR REPORTS, STUDIES OR INVESTIGATION • Motion by Councilman Wu to arrange a tour with the LA County Library – There was no objection.
• Motion by Mayor Calderón Tabatabai to have a presentation updating Council on the Health Department – There was no objection.
CITY COUNCIL COMMENTS
• Councilwoman Diaz – Happy New Year and have a wonderful 2024! • Mayor Calderón Tabatabai – Thanked the NAACP for the event that took place on January 15, 2024 and wished everyone a Happy New Year.
Attachment No. 2
ADJOURNMENT
A motion to adjourn the Regular Meeting was made by Mayor Calderón Tabatabai, and the meeting was adjourned at 8:53 p.m. The next regularly scheduled Regular City Council Meeting will be held on Tuesday, February 6, 2024, at 7:00 p.m. in the Council Chambers, 1444 West Garvey Avenue South, West Covina, California.
Submitted by:
____________________
Lisa Sherrick
Assistant City Clerk
__________________________
Brian Calderón Tabatabai
Mayor
AGENDA ITEM NO. 2
AGENDA STAFF REPORT
City of West Covina | Office of the City Manager
DATE: February 6, 2024
TO: Mayor and City Council
FROM: Paulina Morales
Acting City Manager
SUBJECT: CONSIDERATION OF APPOINTMENTS OF COUNCIL MEMBERS TO SERVE ON
VARIOUS ADVISORY BOARDS AND COMMITTEES
RECOMMENDATION:
Staff recommends that the City Council adopt the following resolution:
RESOLUTION NO. 2024-10 - A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF WEST
COVINA, CALIFORNIA, CONFIRMING APPOINTMENTS OF COUNCIL MEMBERS TO SERVE
ON VARIOUS ADVISORY BOARDS AND COMMITTEES
BACKGROUND:
The City of West Covina is a member of various organizations dedicated to serving the interests of local government in the region, in the State of California, and in the nation. West Covina is also a member of a number of joint powers agencies and other entities, which require an appointment of a member to their governing bodies.
Participation in these activities is significantly important to the City, in that the policies and decisions of these bodies may directly affect the interests of the City. A brief description of the committees and boards, including any stipends associated with serving on such committees and boards, is contained in Attachment No. 2. Stipends, meeting times, and meeting locations are subject to change by the individual agencies.
Section 5-b of the City Council Standing Rules provides: “It shall be the prerogative of the Mayor, taking into consideration relative length of Council service, individual Council Member preference and equivalency, to assign individual Council Members to various committees.” Each year, the Mayor assigns Council Members to serve on various advisory boards and committees, as necessary, and such assignments are subject to confirmation by the City Council as a whole.
DISCUSSION:
Below is a list of the advisory boards/committees:
Below is a list of the advisory boards/committees:
Audit Committee
City/School Cooperative Committee
Community Services Group
Foothill Transit Board
Hurst Ranch
Los Angeles County/City Selection Committee
San Gabriel Valley Council of Governments
Sanitation District Board
Southern California Association of Governments
Mayor Calderón Tabatabai has announced his assignments to the various advisory boards and committees for confirmation by the City Council. Exhibit A of Resolution 2024-10 contains the list of appointees and alternates.
LEGAL REVIEW:
The City Attorney's Office has reviewed the resolution and approved it as to form.
OPTIONS:
The City Council has the following options:
1. Adopt the resolution; or
2. Provide alternative direction.
Prepared by: Lisa Sherrick; Assistant City Clerk
Attachments
Attachment No. 1 - Resolution No. 2024-10
Attachment No. 2 - Committee Descriptions
CITY COUNCIL GOALS & OBJECTIVES: Achieve Fiscal Sustainability and Financial Stability Maintain Good Intergovernmental Relations
Enhance City Image and Effectiveness
Attachment No. 1
RESOLUTION NO. 2024-10
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF
WEST COVINA, CALIFORNIA, CONFIRMING
APPOINTMENTS OF COUNCIL MEMBERS TO SERVE ON
VARIOUS ADVISORY BOARDS AND COMMITTEES
The City Council of the City of West Covina hereby finds and declares as follows:
WHEREAS, the City of West Covina participates in various local and regional advisory boards and committees that benefit the City’s interests; and WHEREAS, pursuant to the City Council’s Standing Rules, the Mayor annually assigns City Council Members to serve as members and alternates to such advisory boards and committees; and
WHEREAS, the City Council desires to confirm the appointments of Council Members to serve on such boards and committees.
NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF WEST COVINA, CALIFORNIA DOES RESOLVE AS FOLLOWS:
SECTION 1. The City Council hereby confirms the appointments set forth in the attached Exhibit A.
SECTION 2. The City Clerk shall certify to the adoption of this resolution and shall enter the same in the book of original resolutions and it shall become effective immediately.
SECTION 3. The City Clerk shall transmit certified copies of this resolution as required.
APPROVED AND ADOPTED this 6th day of February, 2024.
Brian Calderón Tabatabai
Mayor
Attachment No. 1
APPROVED AS TO FORM ATTEST
Thomas P. Duarte Lisa Sherrick
City Attorney Assistant City Clerk
I, LISA SHERRICK, Assistant City Clerk of the City of West Covina, California, do hereby certify that the foregoing Resolution No. 2024-10 was duly adopted by the City Council of the City of West Covina, California, at a regular meeting thereof held on the 6th day of February, 2024, by the following vote of the City Council:
AYES:
NOES:
ABSENT:
ABSTAIN:
Lisa Sherrick
Assistant City Clerk
EXHIBIT A
COUNCIL LIAISON APPOINTMENTS
CITY OF WEST COVINA
2024 COUNCIL LIAISON APPOINTMENTS TO
ADVISORY BOARDS AND COMMITTEES
ORGANIZATION CONTACT
INFORMATION/MEETING
LOCATION
MEETING DATE
AND TIME
REPRESENTATIVE ALTERNATE
Audit Committee
• No stipend issued.
• Both Positions are
Representatives
• Form 700 filing required
West Covina City Hall/MRC At least annually,
with additional
meetings as
needed
Wu, Cantos None
City/School Cooperative
Committee
• No stipend issued.
• Both Positions are
Representatives
• No 700 filing required
West Covina City Hall/MRC Day TBD in May
and October,
4:30 p.m. Lopez-Viado Calderón Tabatabai
Community Service Group
• No stipend issued.
• Both Positions are
Representatives
• No 700 filing required
Every other month,
on the third
Wednesday of the
month
Cantos Wu
Foothill Transit Board
• $161 stipend per meeting
• Form 700 filing required
100 S. Vincent Ave., Suite 200
West Covina, CA 91790
Main No.: (626) 967-3147
Contact Person:
Christina Lopez
(626) 931-7204
[email protected]
As needed and for
annual meeting in
May
Diaz Lopez-Viado
Hurst Ranch
• No stipend issued.
• Both Positions are
Representatives
• No 700 filing required
1227 S. Orange Ave.
West Covina, CA 91790
Main No.: (626) 962-8056
Last Monday of the
month,
10:00 a.m. Lopez-Viado Diaz
Los Angeles County/City
Selection Committee • No stipend issued
Meetings held at different
locations.
As needed
Calderón Tabatabai
(Mayor automatic
appointment)
Diaz
San Gabriel Valley Council of
Governments (SGV COG) • $75 stipend per month
regardless of the number
of meetings
• Form 700 filing required • AB 1234 filing required
1000 S. Fremont Ave., Unit 42
Alhambra, CA 91803
Main No. (626) 457-1800
Contact Person:
Stefanie Hernandez
[email protected]
Meeting Location:
Upper SGV Muni. Water
602 E. Huntington Drive
Monrovia, CA 91016
3 rd Thursday,
6:00 p.m.
Calderón Tabatabai Cantos
Sanitation District Board • $125 stipend per meeting.
NOTE: West Covina falls
within three districts,
therefore, the City’s liaison
attends 3 district meetings
for $375
• Form 700 filing required • AB 1234 filing required
Sanitation Districts
of Los Angeles County
1955 Workman Mill Road
Whittier, CA 90601
Main No.: (562) 908-4288
Fax: (562) 908-4278
Contact Person:
Michael Hsu, Ext. 1112
4 th Wednesday of
the month,
1:30 p.m. Calderón Tabatabai
(Mayor automatic
appointment)
District 15, 21, 22
Wu
Southern California
Association of Governments
(SCAG)• Form 700 filing required • AB 1234 filing required 818 W. Seventh St., 12th Floor
Los Angeles, CA 90017
Main No.: (213) 236-1800
Contact Person:
Tess Rey
[email protected]
Annual Regional
Conference in May
Wu Lopez-Viado
ATTACHMENT NO. 2
City Council Liaison Committee Descriptions
1. Audit Committee
Established in 2015, the Audit Committee’s purpose is to assist the City Council in discharging its responsibilities for the overall stewardship of the City’s financial affairs. This will include reviewing financial information; ascertaining the existence and adequacy of accounting and internal control systems and related safeguards over the City’s assets; and overseeing the audit function.
Stipend: None
2. City/School Cooperative Committee
Meets with the various school districts serving West Covina to address mutual needs and concerns facing the City or school districts.
Stipend: None
3. Community Service Group
The Community Service Group meets quarterly with various service groups and non-profit organizations in the City of West Covina, in an effort to bring together many of the civic and volunteer organizations in the community to promote, partner, educate, sharing resources and combine efforts to benefit the West Covina community. Group also works together on the City’s Annual Community Service Day.
Stipend: None
4. Foothill Transit Board
Foothill Transit was established in 1988 as a public / private partnership that annually serves over 17 million passengers in the San Gabriel and Pomona Valleys, operates 36 fixed-route local, express and rail-feeder lines, and covers 327 square miles. Foothill Transit’s Governing Board is divided into Four Clusters, with the City of West Covina represented in Cluster 2 with the cities of Azusa, Baldwin Park, Covina, Glendora, and Irwindale. Those selected by the City, serve on the Governing Board and meet annually or as needed.
In addition, Foothill Transit has an Executive Board that is governed by five members, with four members elected by each cluster, and a fifth member appointed by the Los Angeles County Board of Supervisors. Committee provides oversight of Foothill Transits operations and provides recommendations on improving bus service to the valleys. Governing Board has an annual meeting in May and meets as needed. Executive Board Members are selected by the Governing Board, and meet the last Friday of each month.
Stipend: Governing Board receives $161 per meeting.
5. Hurst Ranch
According to Article IV of the Hurst Ranch Historical Foundation Articles of Incorporation, the City Council is to designate two Councilmembers to sit on the Hurst Ranch Historical Foundation Board of Directors, and be responsible for overseeing the investments of the Foundation.
Stipend: None
6. Los Angeles County/City Selection Committee
Mayor serves on this Committee that appoints City representatives to such boards, commissions and agencies as may be required by law; i.e., LAFCO, South Coast Air Quality Management District, Los Angeles County Metropolitan Transportation Authority, Los Angeles County Hazardous Waste Management Advisory Committee; and to nominate for appointment members to the California Coastal Commission.
Stipend: None
7. San Gabriel Valley Council of Governments
Coalition of cities from the San Gabriel Valley seeking the Valley’s ‘fair share’ of scarce Federal, State and Local resources by fostering consensus among cities in the San Gabriel Valley regarding policies and programs that address issues relating to land use, air quality, transportation, solid waste, and other matters deemed essential to our cities.
Stipend: $75 per month regardless of the number of meetings.
8. San Gabriel Valley Mosquito Abatement District
Assists cities in managing or eliminating mosquito breeding areas, and responding to complaints about mosquitoes or mosquito-like insects (i.e. bees) in the District. There is no alternate for this committee. Liaison is selected to serve a two-year term.
Stipend: $100 per month regardless of the number of meetings.
9. Sanitation District Board
The County Sanitation Districts of Los Angeles County (Districts) are a confederation of independent special districts serving the wastewater and solid waste management needs of Los Angeles County.
Stipend: $125 per meeting. West Covina falls within three districts, therefore, our liaison attends 3 district meetings for $375 (per meeting).
10. Southern California Association of Governments (SCAG) Serves as the functioning Metropolitan Planning Organization for six counties: Los Angeles, Orange, San Bernardino, Riverside, Ventura and Imperial. The SCAG is mandated by the federal government to research and draw up plans for transportation, growth management, hazardous waste management, and air quality. City of West Covina is allowed to select a representative and alternate to attend the Annual General Assembly Meeting. To serve on the various policy committees, a Councilmember needs to be selected and confirmed by the San Gabriel Valley Council of Governments. Stipends are paid if a Councilmember is selected to serve on a policy committee.
Stipend: None
AGENDA ITEM NO. 3
AGENDA STAFF REPORT
City of West Covina | Office of the City Manager
DATE: February 6, 2024
TO: Mayor and City Council
FROM: Paulina Morales
Acting City Manager
SUBJECT: CONSIDERATION OF CANCELATION OF THE MARCH 5, 2024 COUNCIL MEETING RECOMMENDATION:
It is recommended that the City Council cancel the March 5, 2024 City Council meeting.
BACKGROUND:
The City Council holds regular City Council Meetings on the 1st and 3rd Tuesday of each month.
Meetings that conflict with a national holiday, lack a quorum, or, at the discretion of the City Council, may be canceled so long as advance notice is provided to the public.
DISCUSSION:
City staff is presenting this item for the City Council's consideration and to provide advance notice to the public. Historically, the City Council has canceled meetings due to special events (i.e. National Night Out, Election Night), proximity to holidays, and light agendas.
Staff is recommending that the Council cancel the March 5, 2024 City Council meeting since such meeting falls on the date of the Primary Election.
OPTIONS:
The City Council has the following options:
1) Approve staff's recommendation;
2) Reschedule the meeting to an alternative date; or
3) Provide alternative direction.
Prepared by: Lisa Sherrick; Assistant City Clerk
CITY COUNCIL GOALS & OBJECTIVES: Maintain Good Intergovernmental Relations Enhance City Image and Effectiveness
AGENDA ITEM NO. 4
AGENDA STAFF REPORT
City of West Covina | Office of the City Manager
DATE: February 6, 2024
TO: Mayor and City Council
FROM: Paulina Morales
Acting City Manager
SUBJECT: CONSIDERATION OF COMMISSIONER APPOINTMENT TO THE COMMUNITY AND
SENIOR SERVICES COMMISSION
RECOMMENDATION:
It is recommended that the City Council receive and file this informational report.
BACKGROUND:
Article III (Advisory Commissions) of Chapter 2 (Administration) of the West Covina Municipal Code (WCMC) establishes the City's three commissions and sets forth provisions relating to appointment, vacancies, removal, terms of office, meetings, and responsibilities of City Commissioners.
Commissioners must be at least eighteen (18) years of age, and be a resident and registered voter of the City at the time of appointment and throughout their term of office.
DISCUSSION:
Pursuant to Section 2-67(a) of Article III of Chapter 2 of the WCMC, each Councilmember has the power to appoint one (1) commissioner to each the Human Resources Commission and the Planning Commission, and two (2) commissioners to the Community and Senior Services Commission. Pursuant to Section 2-68 of Article III of Chapter 2 of the WCMC, the terms of office of commissioners run concurrently with that of the appointing Councilmember.
There is currently one vacancy on the Community and Senior Services Commission, to be appointed by Mayor Pro Tem Tony Wu. The City has advertised the vacancies and accepted applications in the manner required by law.
Mayor Pro Tem Tony Wu is announcing the appointment of the following to the Community and Senior Services Commission:
Gia Cablayan
LEGAL REVIEW:
The City Attorney's Office has reviewed this report.
Prepared by: Lisa Sherrick; Assistant City Clerk
CITY COUNCIL GOALS & OBJECTIVES: A Creative and Active Community AGENDA ITEM NO. 5
AGENDA STAFF REPORT
City of West Covina | Office of the City Manager
DATE: February 6, 2024
TO: Mayor and City Council
FROM: Paulina Morales
Acting City Manager
SUBJECT: CONSIDERATION OF APPROVAL OF TRAFFIC RECOMMENDATIONS FROM THE TRAFFIC COMMITTEE MEETINGS BETWEEN SEPTEMBER 2023 AND NOVEMBER 2023
RECOMMENDATION:
It is recommended that the City Council approve the traffic recommendations listed in Attachment No. 1 for traffic engineering improvements citywide from the Traffic Committee Meetings held between September 2023 and November 2023.
BACKGROUND:
The West Covina Traffic Committee regularly meets and holds public meetings on the 2nd Tuesday of each month. The Traffic Committee consists of the City Traffic Engineer Representative, the Chief of Police or at his discretion a representative of the Police Traffic Division, and the City Engineer. The Traffic Committee reviews resident, community, and City requests pertaining to any traffic related items.
These items are presented with recommendations to the Traffic Committee for discussion and approval, and then are later presented to City Council for final approval.
DISCUSSION:
All of the recommended items were presented and discussed at a publicly held West Covina Traffic Committee Meeting. The items presented were unanimously approved by the Traffic Committee for City Council consideration and approval. All recommendations meet standard engineering practice and guidelines as found in the California Manual on Uniform Traffic Control Devices (CAMUTCD), California Vehicle Code (CVC), with engineering judgment. Each item presented was submitted by either a resident, business, community member, or the City to review.
The recommendations below, which are further detailed in Attachment No. 1, are being presented to the City Council for final approval and consideration.
September 2023 Traffic Committee Meeting
1. Traffic Review of Valerie Court and Wednesday Drive
2. Signage Review along “Little Francisquito” Avenue
3. Signage Review along Azusa Avenue at Thelborn Street October 2023 Traffic Committee Meeting
1. Traffic Review of Morganfield Avenue and Point Cedar Drive
2. Traffic Calming Along Willow Avenue Between Merced Avenue and Garvey Avenue
3. Traffic Calming Along Hillside Drive Between South Citrus Street and South Easthill Drive
4. Traffic Calming Along 2800 & 2900 of E Virginia Avenue November 2023 Traffic Committee Meeting
1. Traffic Review of Sunkist Avenue and Yarnell Street
2. Traffic Review of California Avenue and Vine Avenue
3. Traffic Review of Tonopah Avenue and Delvale Street
LEGAL REVIEW:
The City Attorney's Office has reviewed the staff report.
OPTIONS:
The City Council has the following options:
1. Approve Staff's recommendation; or
2. Provide alternative direction.
ENVIRONMENTAL REVIEW:
Staff has reviewed the proposed project and has determined that it is categorically exempt from CEQA pursuant to CEQA Guidelines Section(s) 15302: Replacement or reconstruction; (c) Replacement or reconstruction of existing utility and/or facilities involving negligible or no expansion of capacity.
Prepared by: Jana Robbins, PTP,RSP, Project Manager (Traffic Division) Fiscal Impact
FISCAL IMPACT:
The proposed improvements will be included either as part of an existing project, or under the Annual Citywide Traffic Signage, Stripping, Pavement Markers Program (Project No. 23016). This program allocates $100,000 annually to enhance vehicle mobility and safety. Minor improvements and/or signage replacement may be done in-house by maintenance staff.
Attachments
Attachment No. 1- Traffic Recommendations Approved for Installation by the Traffic Committee CITY COUNCIL GOALS & OBJECTIVES: Protect Public Safety
Enhance City Image and Effectiveness
RECOMMENDATIONS:
The below recommendations were unanimously approved for installation by the Traffic Committee and are brought before City Council for final approval and consideration.
September 2023 Traffic Committee Meeting
1. Traffic Review of Valerie Court and Wednesday Drive: The City of West Covina received a request to review the traffic conditions at the intersection of Valerie Court and Wednesday Drive. The resident expressed concern about line-of-sight issues at this intersection and how it becomes severely limited when vehicles are parked at the corner. The resident requested that an all-way stop control be installed to provide safety when merging onto Wednesday Drive from Valerie Court.
A. Install red curb on the northeast corner of the intersection of Valerie Court & Wednesday Drive, approximately 30-feet of curb along Wednesday Drive.
B. Install red curb on the northwest corner of the intersection of Valerie Court & Wednesday Drive, approximately 20-feet of curb along Wednesday Drive.
C. Refresh Stop Bar and Stop Pavement Legend for SB vehicles turning onto Wednesday Drive from Valerie Court.
D. Install “Cross Traffic Does Not Stop” (W4-4P) Plaque beneath existing stop sign on Valerie Court at Wednesday Drive.
E. Recommend West Covina PD perform Spot Enforcement for speeding vehicles along Wednesday Drive.
F. Recommend West Covina Police Department place their Speed Trailer along Wednesday Drive to remind vehicles of the speed limit.
2. Signage Review along “Little Francisquito” Avenue: The City of West Covina received a request to review the traffic conditions at the intersection of “Little Francisquito” and South Siesta Avenue. Little Francisquito is a frontage road parallel to Francisquito Avenue that ends at a cul-de-sac on each side of Siesta Avenue. The resident reported that drivers tend to be confused by the layout of the area and mistakenly turn into the cul-de-sac instead of the through street (Francisquito Avenue). Resident requests the installation of No Through Street or Dead-End signs.
A. Install “DEAD END” sign (W14-1) with arrow pointing (W14-1a) facing southeast to the direction the street ends. per CAMUTCD Section 2C.26.
3. Signage Review along Azusa Avenue at Thelborn Street: The City of West Covina received a request to review the existing parking signage conditions along Azusa Avenue going northbound near Thelborn Street. The resident reported that there are 2-hour parking signs located along Azusa Avenue, but vehicles such as semi-trucks tend to park for an extended period. The resident asked for the replacement of faded and unidentifiable signs to inform drivers of the current parking restrictions along Azusa Avenue.
A. Replace existing faded “2 HOUR PARKING” sign (R7-108) along east side of Azusa Avenue north and south of Thelborn Avenue. Replace existing pole with 10’ pole and add an additional set of signs approximately 150’ from existing signage also on 10’ pole.
B. Replace existing faded “NO PARKING” sign (R30 (CA)) along east side of Azusa. See Detail 2 in Figure below. Replace existing pole with 10’ pole and add an additional set of signs approximately 150’ from existing signage also on 10’ pole.
October 2023 Traffic Committee Meeting
4. Traffic Review of Morganfield Avenue and Point Cedar Drive: The City of West Covina received a request to review the traffic conditions of the intersection of Morganfield Avenue and Point Cedar Drive.
The resident expressed concern about vehicles speeding along Morganfield Avenue and asked for an allway stop or other traffic calming measures to be installed at the intersection of Morganfield Avenue and Point Cedar Drive.
A. Install 20’ of red curb along each corner on Morganfield Avenue at Point Cedar Drive.
B. Install “30” Pavement Legend adjacent to existing 30 MPH Speed Limit Sign on Morganfield Avenue for northbound traffic.
ATTACHMENT NO.1
C. Install “30” pavement legend adjacent to existing 30 MPH Speed Limit Sign on Morganfield Avenue for southbound traffic (south of Hollingworth Street).
D. Request from West Covina PD spot enforcement and placement of speed trailer on Morganfield Avenue near Point Cedar Drive.
5. Traffic Calming Along Willow Avenue Between Merced Avenue and Garvey Avenue: The City of West Covina received a request to review the traffic conditions along the segment of Willow Avenue between Merced Avenue and W Garvey Avenue South. The resident stated that vehicles frequently speed along this segment of Willow Avenue and expressed concern for pedestrians and children in the neighborhood. The resident requested traffic calming measures and increased police enforcement along Willow Avenue.
A. Install 25 MPH Speed Limit Signage (R2-1) for northbound and southbound travel on Willow Avenue, per CAMUTCD Section 2B.13.
6. Traffic Calming Along Hillside Drive Between South Citrus Street and South Easthill Drive: The City of West Covina received a request to review the traffic conditions along the segment of Hillside Drive, between South Easthills Drive and South Citrus Street. The resident stated that vehicles tend to speed through this segment and fail to make complete stops at the intersections. The resident expressed concern for vehicles and pedestrians traveling through the area and requested traffic calming measures to be installed along the segment on Hillside Drive.
A. Trim the overgrown bushes blocking the view of the Stop Ahead sign (W3-1) located on Hillside Drive west of Citrus Street for westbound traffic, approximately 260-ft east of the intersection. This measure will improve visibility of the Stop Ahead Sign, as the current sign is covered by vegetation.
B. This area will be forwarded to the Police Department for added enforcement, for speeding along Hillside Drive and for drivers not respecting the ALL-WAY Stop signs at intersections.
7. Traffic Calming Along 2800 & 2900 of E Virginia Avenue: The City of West Covina received a request to review the traffic conditions along the segment of E Virginia Avenue to the west of S Barranca Avenue.
This segment is not a through street with a length of roughly 1,070’ to the west. The resident reported that there is traffic along the segment, and vehicles tend to speed through this part of Virginia Avenue. The resident is requesting the installation of 25 MPH speed limit signs to prevent speeding along the segment on Virginia Avenue.
A. Based on Engineering Judgement, The City of West Covina Traffic Request Guidelines, guidelines found in the CAMUTCD (California Manual on Uniform Traffic Control Devices) and CVC (California Vehicle Code), it has been concluded, at this time, that the segment of E Virginia Avenue will be forwarded to the West Covina Police Department to conduct spot enforcement for speeding along Virginia Avenue west of Barranca Street.
November 2023 Traffic Committee Meeting
8. Traffic Review of Sunkist Avenue and Yarnell Street: The City of West Covina received a request to review the traffic conditions and for the installation of an all-way stop at the intersection of South Sunkist Avenue and West Yarnell Street. The resident stated that vehicles often speed along Sunkist Avenue during school drop off and pick up times and expressed concerns for collisions at the intersection and for pedestrian safety near the school.
A. Remove and replace both faded Stop Signs (R1-1) on W Yarnell Street at the intersection with S Sunkist Avenue.
B. Install “Cross Traffic Does Not Stop” Plaque (W4-4P) beneath both stop signs on W Yarnell Street at the intersection with S Sunkist Avenue.
C. Remove and replace existing school signage with new double sided 36”x36” school crossing signage (S1-1) with a 24”x12” downward facing arrow plaque (W16-7P) underneath the S1-1 at the uncontrolled marked school crosswalk at the intersection of Sunkist Avenue and Yarnell Street. The downward facing arrow plaque (W16-7P) and school crossing signage (S1-1) should be facing toward the crosswalk per CAMUTCD section 7B.12.
9. Traffic Review of California Avenue and Vine Avenue: The City of West Covina received a request to review the traffic conditions at the intersection of California Avenue and West Vine Avenue. The resident requested flashing stop signs during school hours, or other traffic safety measures to be installed at the intersection of California Ave and West Vine Avenue due to reports that vehicles are not coming to a complete stop at the intersection.
A. Install “All Way” Plaque (R1-3P) beneath the existing stop signs at the north leg, south leg, and west leg of the intersection at California Avenue and W Vine Avenue.
B. Install Red Reflective Strip on the existing Stop Signposts at the north leg, south leg, and west leg of the intersection at California Avenue and W Vine Avenue.
10. Traffic Review of Tonopah Avenue and Delvale Street: The City of West Covina received a request to review the traffic conditions and installation of 4-way Stop control at the intersection of S Tonopah Avenue and W Delvale Street. The resident expressed concern about vehicles speeding through this intersection to get from Francisquito to Fairgrove quickly, and requests that measures be installed to improve existing conditions at the intersection.
A. Install “CROSS TRAFFIC DOES NOT STOP” plaque (W4-4P) underneath existing Stop Signs for northbound and southbound along Tonopah Avenue at Delvale Street, per CAMUTCD Section 2C.59.
B. Install Stop Ahead warning sign (W3-1) and pavement legend for northbound and southbound traffic along Tonopah Avenue, per CAMUTCD Section 2C.36 & Section 3B.20.
C. Install “25” Pavement Legend adjacent to the existing 25 MPH Speed Limit Signs for both eastbound and westbound directions located on W Delvale Street.
AGENDA ITEM NO. 6
AGENDA STAFF REPORT
City of West Covina | Office of the City Manager
DATE: February 6, 2024
TO: Mayor and City Council
FROM: Paulina Morales
Acting City Manager
SUBJECT: CONSIDERATION OF ACCEPTANCE OF WORK FOR CORTEZ PARK SPORTS FIELD LIGHTING PROJECT - PROJECT NO. 22016
RECOMMENDATION:
It is recommended that the City Council take the following actions:
Accept the work performed by F.E.C. Electric, Inc. for the Cortez Park Sports Field Lighting Project (Project No. 22016) with a final contract amount of $233,500.00;
1. Authorize the Acting City Manager and Assistant City Clerk to execute the Notice of Completion and file the Notice of Completion with the County of Los Angeles Registrar-Recorder; and
2. 3. Authorize the Acting City Manager to release retention funds once appropriate.
BACKGROUND:
On September 5, 2023, the City Council awarded a Construction Services Agreement totaling $233,500.00 to F.E.C. Electric, Inc., for the Cortez Park Sports Field Lighting Project (Project No. 22016).
The project construction budget also included a contingency budget of $35,025.00 (15% of awarded agreement amount) for any unforeseen conditions as necessary. The total established construction budget was $268,525.00.
The project included the installation of new lighting standards (poles, fixtures, conduits, panels, etc.) to the two baseball fields and multipurpose field at Cortez Park, located at 2441 E Cortez St., West Covina.
As part of the improvements, seven field light poles were replaced with new field light standards (poles, fixtures), and seven light poles were retrofitted with new light fixtures; new light control and monitoring system were also installed.
DISCUSSION:
All required improvements were constructed in conformance with the approved plans and specifications.
The work was performed within the contractually specified duration and to the City Engineer’s satisfaction. Construction costs totaled $233,500.00, which is within the approved construction budget.
The City retains five percent (5%) of each payment to the contractor as retention to ensure payment to subcontractors and material suppliers before final payment to the contractor. The City Council’s acceptance of the project and the City's recordation of the Notice of Completion trigger timeframes within which subcontractors or material suppliers must file claims for payment if they have not been paid by the contractor. If no claims are filed within 35 days of the filing of the Notice of Completion, the City will release retention and any remaining amount due to the contractor.
LEGAL REVIEW:
The City Attorney's Office has reviewed the staff report.
Prepared by: Okan Demirci, PE, QSD/P
Fiscal Impact
FISCAL IMPACT:
This contract was funded under Project No. 22016 (ARPA Local Fiscal Recovery Funds, Fund 179).
The contract was completed within the approved construction estimate.
Construction Contract 233,500
Contingency (15%) 35,025
Total Construction Contract Budget $268,525
Actual Expenditures 233,500
(Over)/Under Construction Contract Budget $35,025
Attachments
Attachment No. 1 - Notice of Completion
CITY COUNCIL GOALS & OBJECTIVES: Protect Public Safety
A Creative and Active Community
Enhance City Image and Effectiveness
ATTACHMENT NO. 1
RECORDING REQUESTED BY
AND WHEN RECORDED MAIL TO:
City Clerk
City of West Covina
1444 W. Garvey Ave. S.
West Covina, CA 91790
EXEMPT FROM RECORDING FEES –
GOVERNMENT CODE §§ 6103, 27383
SPACE ABOVE LINE FOR RECORDER’S USE ONLY
NOTICE OF COMPLETION
(California Civil Code § 9204)
NOTICE IS HEREBY GIVEN THAT:
1. Name and Address of Owner. The City of West Covina (“City”), a municipal corporation, whose address is 1444 W. Garvey Ave. S., West Covina, CA 91790, is the fee owner of the public work of improvement described herein and of the property containing said public work of improvement.
2. Description of Public Work of Improvement. The public work of improvement is the project known as:
Cortez Park Sports Field Lighting Project (Project No. 22016).
3. Location of Public Work of Improvement. The public work of improvement is generally located at:
Cortez Park, 2441 E Cortez St, West Covina, CA 91791.
4. Award of Contract; Contractor. On September 5, 2023, the City awarded a contract to construct the public work of improvement to F.E.C. Electric, Inc., P.O. Box 77, Redlands, CA 92373.
5. Date of Completion. The public work of improvement was completed to the satisfaction of the City Engineer on: December 22, 2023.
6. Date of Acceptance. The City Council accepted the public work of improvement on February 6, 2024. _____________________________________
Paulina Morales, Acting City Manager Date
City of West Covina
VERIFICATION
I, the undersigned, say: I am the Assistant City Clerk of the City of West Covina, the declarant of the foregoing Notice of Completion; I have read said Notice of Completion and know the contents thereof; the same is true of my own knowledge. I declare under penalty of perjury that the foregoing is true and correct.
Executed on _____________________, at West Covina, California. _______________________________
Lisa Sherrick
Assistant City Clerk
AGENDA ITEM NO. 7
AGENDA STAFF REPORT
City of West Covina | Office of the City Manager
DATE: February 6, 2024
TO: Mayor and City Council
FROM: Paulina Morales
Acting City Manager
SUBJECT: CONSIDERATION OF ACCEPTANCE OF WORK FOR CITYWIDE PEDESTRIAN & VEHICLE TRAFFIC SAFETY IMPROVEMENTS FY 22-23 - PROJECT NO. 23027 RECOMMENDATION:
It is recommended that the City Council take the following actions:
Accept the work performed by Superior Pavement Markings, Inc. for the Citywide Pedestrian and Vehicle Safety Improvements FY 22-23 (Project No. 23027) with a final contract amount of $254,347.87;
1. Authorize the Acting City Manager and Assistant City Clerk to execute the Notice of Completion and file the Notice of Completion with the County of Los Angeles Registrar-Recorder; and
2. 3. Authorize the Acting City Manager to release a retention funds once appropriate.
BACKGROUND:
On January 17, 2023, the City Council awarded a Construction Services Agreement totaling $232,916.00 to Superior Pavement Markings, Inc., for the Citywide Pedestrian & Vehicle Traffic Safety Improvements FY 22-23 (Project No. 23027). The project construction budget also included a contingency budget of $34,937.40 (15% of awarded agreement amount) for any unforeseen conditions as necessary. The total established construction budget was $267,853.40.
The project included all of the traffic safety recommendations approved by the Traffic Committee at approximately 19 locations Citywide. Major work components include installation of pedestrian and vehicle traffic safety improvements including signage, striping, and pavement markers at various locations Citywide and all related work at the following locations:.
Greenleaf Drive curve near Brynwood Place
Glendora Avenue at Walnut Creek Parkway
Vine Avenue at Hollenbeck Avenue
Lark Hill Drive and Citrus Street
Workman Avenue between Azusa Avenue and Lark Ellen Avenue Mobeck Street to Cameron Avenue
Segment of Casa Grande Drive between Michelle Street and Hollencrest Drive Rowland Avenue Elementary School
Intersection at Glenview Road and Francisquito Avenue
Intersection of Lisa Street at Nanette Avenue
Workman Avenue between Azusa Avenue and Workman Avenue Elementary School illow Avenue at Alwood Street & Tamar Drive at Alwood Street Merced Avenue between Azusa Avenue and Glenview Road
Pacific Avenue between Cameron Avenue and West Covina City Limit Ridgewood Avenue between Nanette Avenue and Amar Road
1838 and 1822 Cortez Street
Traweek Middle School, Drop Off And Pick Up
Jennifer Place & Eclipse Way
Sunset Avenue at Rowland Avenue
DISCUSSION:
All required improvements were constructed in conformance with the approved plans and specifications.
The work was performed within the contractually specified duration and to the City Engineer’s satisfaction. Construction costs totaled $254,347.87, which is within the approved construction budget.
The City retains five percent (5%) of each payment to the contractor as retention to ensure payment to subcontractors and material suppliers before final payment to the contractor. The City Council’s acceptance of the project and the City's recordation of the Notice of Completion trigger timeframes within which subcontractors or material suppliers must file claims for payment if they have not been paid by the contractor. If no claims are filed within 35 days of the filing of the Notice of Completion, the City will release retention and any remaining amount due to the contractor.
LEGAL REVIEW:
The City Attorney's Office has reviewed the staff report.
Prepared by: Okan Demirci, PE, QSD/P
Fiscal Impact
FISCAL IMPACT:
This contract was funded under Project No. 23027 (SB1 - Road Maintenance Rehab, Fund 237). The contract was completed within the approved construction estimate.
Construction Contract 232,916.00
Contingency Allowance (15%) 34,937.40
Total Construction Contract Budget $267,853.40
Actual Expenditures 254,347.87
(Over)/Under Construction Contract Budget $13,505.53
Attachments
Attachment No. 1 - Notice of Completion
CITY COUNCIL GOALS & OBJECTIVES: Protect Public Safety
A Creative and Active Community
Enhance City Image and Effectiveness
ATTACHMENT NO. 1
RECORDING REQUESTED BY
AND WHEN RECORDED MAIL TO:
City Clerk
City of West Covina
1444 W. Garvey Ave. S.
West Covina, CA 91790
EXEMPT FROM RECORDING FEES –
GOVERNMENT CODE §§ 6103, 27383
SPACE ABOVE LINE FOR RECORDER’S USE ONLY
NOTICE OF COMPLETION
(California Civil Code § 9204)
NOTICE IS HEREBY GIVEN THAT:
1. Name and Address of Owner. The City of West Covina (“City”), a municipal corporation, whose address is 1444 W. Garvey Ave. S., West Covina, CA 91790, is the fee owner of the public work of improvement described herein and of the property containing said public work of improvement.
2. Description of Public Work of Improvement. The public work of improvement is the project known as:
Citywide Pedestrian & Vehicle Traffic Safety Improvements FY 22-23 (Project No. 23037).
3. Location of Public Work of Improvement. The public work of improvement is generally located at:
Multiple Locations – Citywide, including:
• Greenleaf Drive curve near Brynwood Place
• Glendora Avenue at Walnut Creek Parkway
• Vine Avenue at Hollenbeck Avenue
• Lark Hill Drive and Citrus Street
• Workman Avenue between Azusa Avenue and Lark Ellen Avenue • Mobeck Street to Cameron Avenue
• Segment of Casa Grande Drive between Michelle Street and Hollencrest Drive • Rowland Avenue Elementary School
• Intersection at Glenview Road and Francisquito Avenue • Intersection of Lisa Street at Nanette Avenue
• Workman Avenue between Azusa Avenue and Workman Avenue Elementary School • Willow Avenue at Alwood Street & Tamar Drive at Alwood Street • Merced Avenue between Azusa Avenue and Glenview Road
• Pacific Avenue between Cameron Avenue and West Covina City Limit • Ridgewood Avenue between Nanette Avenue and Amar Road • 1838 and 1822 Cortez Street
• Traweek Middle School, Drop Off And Pick Up
• Jennifer Place & Eclipse Way
• Sunset Avenue At Rowland Avenue
4. Award of Contract; Contractor. On January 17, 2023, the City awarded a contract to construct the public work of improvement to Superior Pavement Markings, Inc., 5312 Cypress St, Cypress, CA 90630.
5. Date of Completion. The public work of improvement was completed to the satisfaction of the City Engineer on: December 22, 2023.
6. Date of Acceptance. The City Council accepted the public work of improvement on February 6, 2024. _______________________________________
Paulina Morales, Acting City Manager Date
City of West Covina
VERIFICATION
I, the undersigned, say: I am the Assistant City Clerk of the City of West Covina, the declarant of the foregoing Notice of Completion; I have read said Notice of Completion and know the contents thereof; the same is true of my own knowledge. I declare under penalty of perjury that the foregoing is true and correct.
Executed on _____________________, at West Covina, California. _______________________________
Lisa Sherrick
Assistant City Clerk
AGENDA ITEM NO. 8
AGENDA STAFF REPORT
City of West Covina | Office of the City Manager
DATE: February 6, 2024
TO: Mayor and City Council
FROM: Paulina Morales
Acting City Manager
SUBJECT: CONSIDERATION OF RESOLUTION NO. 2024-2 REPEALING AND REPLACING THE
SALARY SCHEDULE FOR FULL-TIME CLASSIFICATIONS
RECOMMENDATION:
It is recommended that the City Council adopt the following resolution:
RESOLUTION NO. 2024-2 - A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF WEST
COVINA, CALIFORNIA, REPEALING AND REPLACING THE SALARY SCHEDULE FOR
FULL-TIME CLASSIFICATIONS OF THE CITY OF WEST COVINA
BACKGROUND:
Public agencies are required to report pay rates to the California Public Employees' Retirement System ("CalPERS"). Government Code sections 20636, 20636.1, 7522.34(a) and corresponding provisions of Section 570.5 of Title 2 of the California Code of Regulations (CCR) require that all CalPERS employers maintain their compensation levels in a publicly available document, approved and adopted by the governing body.
DISCUSSION:
The updated full-time salary schedule (Exhibit A to Attachment No. 1), includes the approved salaries reflecting cost-of-living adjustments (COLA) as per current Memorandums of Understanding with City bargaining units as well as the recently revised Salary & Benefit Schedule for Department Heads.
LEGAL REVIEW:
The City Attorney's Office has reviewed the resolution and approved it as to form.
Prepared by: Stephanie Sikkema, Finance Director
Fiscal Impact
FISCAL IMPACT:
This resolution is solely an administrative item that reflects changes previously approved by Council and does not change the total number of budgeted positions. Therefore, there is no fiscal impact associated with this action.
Attachments
Attachment No. 1 - Resolution No. 2024-2
Exhibit A - Full-Time Salary Schedule
CITY COUNCIL GOALS & OBJECTIVES: Achieve Fiscal Sustainability and Financial Stability Maintain Good Intergovernmental Relations
ATTACHMENT NO. 1
RESOLUTION NO. 2024-2
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF
WEST COVINA, CALIFORNIA, REPEALING AND
REPLACING THE SALARY SCHEDULE FOR FULL-TIME
CLASSIFICATIONS OF THE CITY OF WEST COVINA
THE CITY COUNCIL OF THE CITY OF WEST COVINA HEREBY FINDS, DETERMINES, AND DECLARES AS FOLLOWS:
WHEREAS, Section 2-205 of the West Covina Municipal Code provides that the compensation of employees shall be fixed as set forth in the Municipal Code or by resolution of the City Council; and
WHEREAS, on September 5, 2023, the City approved Resolution No. 2023-74 and Resolution No. 2023-75 establishing the Landscape Maintenance Lead-Worker and Maintenance Supervisor classifications and the new salary grades; and WHEREAS, on November 7, 2023, the City approved Resolutions Nos. 2023-82, 2023-83, 2023-84, and 2023-85 updating the Accounting Technician and Accountant classifications and salary grades; and
WHEREAS, on December 19, 2023, the City approved Resolutions Nos. 2023-98, 2023-99, 2023-100, 2023-101, and 2023-102 updating classifications and salary grades as a result of the new organizational chart approved by the City Council on October 3, 2023; and
WHEREAS, on December 19, 2023, the City Council approved Resolution No. 2023-113 adopting the revised salary and benefits schedule for Non-Represented City Department Heads, which included salary increases; and
WHEREAS, public agencies report payrates to California Public Employees’ Retirement System (“CalPERS”). Government Code sections 20636, 20636.1, 7522.34(a) and corresponding provisions set forth in Section 570.5 of Title 2 of the California Code of Regulations require that all CalPERS employers maintain their compensation levels in a publicly available document, approved and adopted by the governing body; and
WHEREAS, the City Council desires to update the City’s Full-Time Salary Schedule accordingly.
NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF WEST COVINA, CALIFORNIA DOES HEREBY RESOLVE AS FOLLOWS:
SECTION 1. The above recitals are true and correct and are incorporated herein by this reference.
SECTION 2. The Full-Time Salary Schedule adopted on December 20, 2022 through the adoption of Resolution No. 2022-113 is hereby repealed and replaced with the Full-Time Salary Schedule set forth in Exhibit “A,” attached hereto and incorporated herein.
SECTION 3. The City Clerk shall certify to the adoption of this resolution and shall enter the same in the book of original resolutions and it shall become effective immediately.
APPROVED AND ADOPTED this 6th day of February, 2024.
Brian Calderón Tabatabai
Mayor
APPROVED AS TO FORM ATTEST
Thomas P. Duarte Lisa Sherrick
City Attorney Assistant City Clerk
I, LISA SHERRICK, ASSISTANT CITY CLERK of the City of West Covina, California, do hereby certify that the foregoing Resolution No. 2024-2 was duly adopted by the City Council of the City of West Covina, California, at a regular meeting thereof held on the 6th day of February, 2024, by the following vote of the City Council:
AYES:
NOES:
ABSENT:
ABSTAIN:
Lisa Sherrick
Assistant City Clerk
EXHIBIT A
FULL-TIME SALARY SCHEDULE
Group/Position Title Grade Code Step 1 Step 2 Step 3 Step 4 Step 5
CONFIDENTIAL EMPLOYEES' ASSOCIATION
ACCOUNTANT I CE10 $4,955 $6,689
ACCOUNTANT II CE19 $5,351 $7,224
ACCOUNTING TECHNICIAN I CE02 $3,756 $5,069
ACCOUNTING TECHNICIAN II CE18 $4,056 $5,475
ADMINISTRATIVE AIDE CE03 $3,917 $5,288
ADMINISTRATIVE ASSISTANT II CE01 $3,685 $4,970
COMPUTER SERVICES TECHNICIAN CE17 $4,680 $4,914 $5,159 $5,417 $5,689 CRIMINAL JUSTICE RES ANALYST I CE09 $4,859 $6,560
CRIMINAL JUSTICE RES ANALYST II CE14 $5,905 $7,381
DEPARTMENTAL AIDE CE05 $4,260 $6,100
DEPUTY CITY CLERK CE07 $4,714 $6,364
EXEC ASSISTANT TO CITY MANAGER CE06 $4,532 $6,115
GIS ANALYST CE13 $5,747 $6,035 $6,337 $6,654 $6,986
HUMAN RESOURCES ANALYST CE15 $6,158 $6,482 $6,823 $7,181 $7,559 HUMAN RESOURCES TECHNICIAN CE04 $3,980 $5,371
INFORMATION TECH ANALYST I CE20 $6,008 $8,047
INFORMATION TECH ANALYST II CE21 $8,047 $8,850
PAYROLL SPECIALIST CE08 $4,810 $5,064 $5,330 $5,610 $5,906 SENIOR ACCOUNTANT CE16 $6,194 $8,362
SENIOR ADMINISTRATIVE ASSISTANT CE04 $3,980 $5,371
SENIOR HUMAN RESOURCES TECHNICIAN CE11 $5,040 $5,292 $5,556 $5,834 $6,126 USER SUPPORT SPECIALIST CE12 $5,195 $7,013
DEPARTMENT HEAD
ASSISTANT CITY CLERK DH13 $8,392 $11,328
ASSISTANT CITY MANAGER DH04 $12,902 $17,414
CITY MANAGER DH01 $20,220
CODE ENFORCEMENT DIRECTOR DH14 $10,328 $13,943
COMM DEVELOPMENT DIRECTOR DH07 $11,103 $14,991
COMMUNITY SERVICES DIRECTOR DH09 $10,776 $14,547
DEPUTY CITY MANAGER DH12 $9,316 $12,576
FINANCE DIRECTOR DH08 $13,257 $17,897
FIRE CHIEF DH03 $14,733 $19,890
HUMAN RESOURCES & RISK MGMT DIRECTOR DH10 $10,484 $14,153 PLANNING DIRECTOR DH11 $10,328 $13,943
POLICE CHIEF DH02 $16,374 $20,632
PUBLIC HEALTH OFFICER DH15 $14,723 $15,458 $16,232 $17,044 $17,897 PUBLIC SERVICES DIRECTOR DH05 $12,610 $17,025
PUBLIC WORKS DIRECTOR DH05 $12,610 $17,025
CITY OF WEST COVINA
AS OF JANUARY 6, 2024
FULL‐TIME SALARY SCHEDULE
Resolution No. 2024-2 Page 1 of 8
Group/Position Title Grade Code Step 1 Step 2 Step 3 Step 4 Step 5
CITY OF WEST COVINA
AS OF JANUARY 6, 2024
FULL‐TIME SALARY SCHEDULE
FIRE MANAGEMENT ASSOCIATION
ASSISTANT FIRE CHIEF FM01 $10,313 $13,928
FIREFIGHTERS' ASSOCIATION
FIRE CAPTAIN FR03 $9,384 $9,853 $10,346 $10,863 $11,407 FIRE ENGINEER FR02 $8,025 $8,427 $8,848 $9,290 $9,755
FIREFIGHTER FR01 $6,886 $7,230 $7,592 $7,971 $8,370
FIREFIGHTER/PARAMEDIC FR02 $8,025 $8,427 $8,848 $9,290 $9,755
GENERAL EMPLOYEES' ASSOCIATION
ACCOUNT CLERK GN03 $3,464 $3,638 $3,819 $4,010 $4,211
ADMINISTRATIVE ASSISTANT I GN04 $3,692 $3,876 $4,070 $4,274 $4,488 ADMINISTRATIVE TECHNICIAN GN03 $3,464 $3,638 $3,819 $4,010 $4,211 CODE ENFORCEMENT OFFICER GN09 $4,625 $4,857 $5,100 $5,354 $5,622 COMMUNITY ENHANCEMENT OFFICER GN09 $4,625 $4,857 $5,100 $5,354 $5,622 COMMUNITY SERVICES COORDINATOR GN13 $4,810 $5,051 $5,303 $5,568 $5,847 ECONOMIC DEVELOPMENT SPECIALIST GN12 $4,700 $4,935 $5,182 $5,441 $5,713 FIRE PROTECTION SPECIALIST GN14 $5,101 $5,355 $5,623 $5,905 $6,200 FLEET SERVICES COORDINATOR GN17 $5,593 $5,872 $6,165 $6,474 $6,798 HEAD COOK GN08 $4,119 $4,324 $4,541 $4,768 $5,006
HOUSING PROGRAM COORDINATOR GN18 $5,840 $6,132 $6,438 $6,760 $7,098 OFFICE ASSISTANT I GN01 $2,704 $2,839 $2,980 $3,130 $3,286 OFFICE ASSISTANT II GN02 $3,098 $3,253 $3,416 $3,586 $3,766 PLANNING AIDE GN06 $3,818 $4,009 $4,210 $4,420 $4,642
PLANNING ASSISTANT GN15 $5,139 $5,395 $5,666 $5,949 $6,247 PLANNING ASSOCIATE GN16 $5,508 $5,783 $6,071 $6,375 $6,695 POLICE OFFICER RECRUIT GN10 $4,659 $4,891 $5,136 $5,393 $5,662 SENIOR ACCOUNT CLERK GN05 $3,748 $3,936 $4,132 $4,339 $4,556 VICTIM ADVOCATE GN07 $3,891 $4,086 $4,290 $4,504 $4,730
MAINTENANCE & CRAFTS EMPLOYEES' ASSOCIATION
BUILDING MAINTENANCE LEAD WORKER MT10 $4,711 $4,946 $5,194 $5,454 $5,727 ELECTRICIAN I MT05 $3,877 $4,072 $4,275 $4,489 $4,714
ELECTRICIAN II MT11 $4,824 $5,065 $5,319 $5,584 $5,864
ELECTRICIAN LEAD WORKER MT13 $5,344 $5,611 $5,892 $6,186 $6,495 EQUIPMENT MECHANIC LEAD WORKER MT12 $5,048 $5,300 $5,566 $5,845 $6,137 EQUIPMENT MECHANIC I MT03 $3,775 $3,964 $4,163 $4,370 $4,589 EQUIPMENT MECHANIC II MT08 $4,459 $4,683 $4,917 $5,163 $5,421 EQUIPMENT OPERATOR MT07 $4,339 $4,556 $4,784 $5,023 $5,274 LANDSCAPE MAINTENANCE LEAD WRK MT15 $4,573 $4,802 $5,041 $5,293 $5,558 MAINTENANCE LEAD WORKER MT09 $4,573 $4,802 $5,041 $5,293 $5,558 MAINTENANCE SVCS COORDINATOR MT14 $5,611 $5,892 $6,186 $6,495 $6,820 MAINTENANCE WORKER I MT01 $3,484 $3,658 $3,842 $4,033 $4,235 MAINTENANCE WORKER II MT02 $3,657 $3,841 $4,032 $4,234 $4,446 MAINTENANCE WORKER III MT04 $3,838 $4,031 $4,231 $4,443 $4,666 SENIOR MAINTENANCE WORKER MT06 $3,911 $4,105 $4,310 $4,526 $4,753 Resolution No. 2024-2 Page 2 of 8
Group/Position Title Grade Code Step 1 Step 2 Step 3 Step 4 Step 5
CITY OF WEST COVINA
AS OF JANUARY 6, 2024
FULL‐TIME SALARY SCHEDULE
MID‐MANAGEMENT EMPLOYEES' ASSOCIATION
ACCOUNTING MANAGER MM21 $7,092 $9,576
ASSISTANT FINANCE DIRECTOR MM31 $12,569 $13,197 $13,846 $14,550 $15,278 ASSISTANT TO THE CITY MANAGER MM25 $7,399 $9,990
CODE ENFORCEMENT MANAGER MM27 $8,004 $10,841
CODE ENFORCEMENT SUPERVISOR MM05 $5,684 $7,673
COMMUNICATIONS MANAGER MM12 $6,608 $8,811
COMMUNICATIONS SUPERVISOR MM03 $5,497 $7,425
COMMUNITY SERVICES MANAGER MM19 $6,607 $8,919
DEPUTY COMM DEVELOPMENT DIRECTOR MM13 $9,094 $12,277
DEPUTY COMM SERVICES DIRECTOR MM07 $8,170 $11,030
DEPUTY FIRE MARSHAL MM14 $6,313 $7,673
DEPUTY PUBLIC WORKS DIRECTOR MM33 $10,370 $10,916 $11,490 $12,094 $12,731 ECON DEVELOPMENT PROJECT COORDINATOR MM16 $6,016 $8,122 ECON DEVELOPMENT/HOUSING MANAGER MM26 $8,003 $10,806
FIRE MARSHAL MM25 $7,399 $9,990
FORENSIC SPECIALIST SUPERVISOR MM18 $8,482 $8,906 $9,351 $9,820 $10,311 HUMAN RESOURCES MANAGER MM20 $8,831 $9,296 $9,785 $10,299 $10,842 INFORMATION TECHNOLOGY MANAGER MM28 $8,800 $11,120
MANAGEMENT ANALYST I MM01 $4,832 $6,521
MANAGEMENT ANALYST II MM16 $6,016 $8,122
PARK MAINTENANCE SUPERVISOR MM06 $5,717 $7,719
PLANNING MANAGER MM29 $8,487 $11,458
POLICE ADMIN SERVICES MANAGER MM22 $7,100 $9,584
POLICE RECORDS MANAGER MM18 $8,482 $8,906 $9,351 $9,820 $10,311 POLICE RECORDS SUPERVISOR MM04 $5,675 $7,659
PRINCIPAL PLANNER MM23 $7,137 $9,636
PROJECT MANAGER MM08 $8,960 $10,891
PUBLIC SERVICES MANAGER MM24 $7,393 $9,980
PUBLIC WORKS SUPERINTENDENT MM30 $8,700 $11,744
PURCHASING MANAGER MM17 $6,322 $8,536
RECREATION SERVICES SUPERVISOR MM02 $5,344 $7,215
RECREATION SUPERINTENDENT MM11 $6,477 $8,745
SENIOR CITIZEN'S SERV SUPERVIS MM02 $5,344 $7,215
SENIOR HUMAN RESOURCES ANALYST MM32 $7,002 $7,352 $7,720 $8,106 $8,512 SENIOR PLANNER MM29 $8,487 $11,458
STREET MAINTENANCE SUPERVISOR MM09 $5,825 $7,865
Resolution No. 2024-2 Page 3 of 8
Group/Position Title Grade Code Step 1 Step 2 Step 3 Step 4 Step 5
CITY OF WEST COVINA
AS OF JANUARY 6, 2024
FULL‐TIME SALARY SCHEDULE
POLICE MANAGEMENT ASSOCIATION
POLICE CORPORAL PD02 $8,189 $8,599 $9,028 $9,479 $9,954 POLICE OFFICER PD01 $7,600 $7,980 $8,379 $8,798 $9,238
POLICE SERGEANT PD03 $9,478 $9,953 $10,450 $10,973 $11,522 POLICE OFFICERS’ ASSOCIATION
POLICE CAPTAIN PM02 $16,721 $19,229
POLICE LIEUTENANT PM01 $15,754 $16,805 $17,951
POLICE SUPPORT SERVICES ASSOCIATION
COMMUNITY SERVICES OFFICER NS03 $3,731 $3,917 $4,112 $4,320 $4,536 FORENSIC SPECIALIST NS08 $5,654 $5,951 $6,264 $6,594 $6,940 JAILER NS04 $3,884 $4,082 $4,284 $4,501 $4,724
LEAD JAILER NS05 $4,275 $4,505 $4,735 $4,966 $5,196
POLICE RECORDS SPECIALIST I NS01 $3,240 $3,405 $3,574 $3,752 $3,940 POLICE RECORDS SPECIALIST II NS02 $3,475 $3,649 $3,833 $4,025 $4,224 PUBLIC SAFETY DISPATCHER NS06 $4,986 $5,235 $5,497 $5,772 $6,060 SENIOR COMMUNICATIONS OPERATOR NS07 $5,584 $5,864 $6,157 $6,464 $6,786 SENIOR FORENSIC SPECIALIST NS09 $6,818 $7,177 $7,555 $7,953 $8,371 Resolution No. 2024-2 Page 4 of 8
Group/Position Title Grade Code Step 1 Step 2 Step 3 Step 4 Step 5
CONFIDENTIAL EMPLOYEES' ASSOCIATION
ACCOUNTANT I CE10 $4,955 $6,689
ACCOUNTANT II CE19 $5,351 $7,224
ACCOUNTING TECHNICIAN I CE02 $3,756 $5,069
ACCOUNTING TECHNICIAN II CE18 $4,056 $5,475
ADMINISTRATIVE AIDE CE03 $3,917 $5,288
ADMINISTRATIVE ASSISTANT II CE01 $3,685 $4,970
COMPUTER SERVICES TECHNICIAN CE17 $4,680 $4,914 $5,159 $5,417 $5,689 CRIMINAL JUSTICE RES ANALYST I CE09 $4,859 $6,560
CRIMINAL JUSTICE RES ANALYST II CE14 $5,905 $7,381
DEPARTMENTAL AIDE CE05 $4,260 $6,100
DEPUTY CITY CLERK CE07 $4,714 $6,364
EXEC ASSISTANT TO CITY MANAGER CE06 $4,532 $6,115
GIS ANALYST CE13 $5,747 $6,035 $6,337 $6,654 $6,986
HUMAN RESOURCES ANALYST CE15 $6,158 $6,482 $6,823 $7,181 $7,559 HUMAN RESOURCES TECHNICIAN CE04 $3,980 $5,371
INFORMATION TECH ANALYST I CE20 $6,008 $8,047
INFORMATION TECH ANALYST II CE21 $8,047 $8,850
PAYROLL SPECIALIST CE08 $4,810 $5,064 $5,330 $5,610 $5,906 SENIOR ACCOUNTANT CE16 $6,194 $8,362
SENIOR ADMINISTRATIVE ASSISTANT CE04 $3,980 $5,371
SENIOR HUMAN RESOURCES TECHNICIAN CE11 $5,040 $5,292 $5,556 $5,834 $6,126 USER SUPPORT SPECIALIST CE12 $5,195 $7,013
DEPARTMENT HEAD
ASSISTANT CITY CLERK DH13 $8,392 $11,328
ASSISTANT CITY MANAGER DH04 $12,902 $17,414
CITY MANAGER DH01 $20,220
CODE ENFORCEMENT DIRECTOR DH14 $10,328 $13,943
COMM DEVELOPMENT DIRECTOR DH07 $11,103 $14,991
COMMUNITY SERVICES DIRECTOR DH09 $10,776 $14,547
DEPUTY CITY MANAGER DH12 $9,316 $12,576
FINANCE DIRECTOR DH08 $13,257 $17,897
FIRE CHIEF DH03 $14,733 $19,890
HUMAN RESOURCES & RISK MGMT DIRECTOR DH10 $10,484 $14,153 PLANNING DIRECTOR DH11 $10,328 $13,943
POLICE CHIEF DH02 $16,374 $20,632
PUBLIC HEALTH OFFICER DH15 $14,723 $15,458 $16,232 $17,044 $17,897 PUBLIC SERVICES DIRECTOR DH05 $12,610 $17,025
PUBLIC WORKS DIRECTOR DH05 $12,610 $17,025
CITY OF WEST COVINA
FULL‐TIME SALARY SCHEDULE
EFFECTIVE FIRST FULL PAY PERIOD FOLLOWING JULY 1, 2024
Resolution No. 2024-2 Page 5 of 8
Group/Position Title Grade Code Step 1 Step 2 Step 3 Step 4 Step 5
CITY OF WEST COVINA
FULL‐TIME SALARY SCHEDULE
EFFECTIVE FIRST FULL PAY PERIOD FOLLOWING JULY 1, 2024
FIRE MANAGEMENT ASSOCIATION
ASSISTANT FIRE CHIEF FM01 $10,313 $13,928
FIREFIGHTERS' ASSOCIATION
FIRE CAPTAIN FR03 $9,666 $10,149 $10,656 $11,189 $11,749 FIRE ENGINEER FR02 $8,266 $8,680 $9,113 $9,569 $10,048
FIREFIGHTER FR01 $7,093 $7,447 $7,820 $8,210 $8,621
FIREFIGHTER/PARAMEDIC FR02 $8,266 $8,680 $9,113 $9,569 $10,048
GENERAL EMPLOYEES' ASSOCIATION
ACCOUNT CLERK GN03 $3,464 $3,638 $3,819 $4,010 $4,211
ADMINISTRATIVE ASSISTANT I GN04 $3,692 $3,876 $4,070 $4,274 $4,488 ADMINISTRATIVE TECHNICIAN GN03 $3,464 $3,638 $3,819 $4,010 $4,211 CODE ENFORCEMENT OFFICER GN09 $4,625 $4,857 $5,100 $5,354 $5,622 COMMUNITY ENHANCEMENT OFFICER GN09 $4,625 $4,857 $5,100 $5,354 $5,622 COMMUNITY SERVICES COORDINATOR GN13 $4,810 $5,051 $5,303 $5,568 $5,847 ECONOMIC DEVELOPMENT SPECIALIST GN12 $4,700 $4,935 $5,182 $5,441 $5,713 FIRE PROTECTION SPECIALIST GN14 $5,101 $5,355 $5,623 $5,905 $6,200 FLEET SERVICES COORDINATOR GN17 $5,593 $5,872 $6,165 $6,474 $6,798 HEAD COOK GN08 $4,119 $4,324 $4,541 $4,768 $5,006
HOUSING PROGRAM COORDINATOR GN18 $5,840 $6,132 $6,438 $6,760 $7,098 OFFICE ASSISTANT I GN01 $2,704 $2,839 $2,980 $3,130 $3,286 OFFICE ASSISTANT II GN02 $3,098 $3,253 $3,416 $3,586 $3,766 PLANNING AIDE GN06 $3,818 $4,009 $4,210 $4,420 $4,642
PLANNING ASSISTANT GN15 $5,139 $5,395 $5,666 $5,949 $6,247 PLANNING ASSOCIATE GN16 $5,508 $5,783 $6,071 $6,375 $6,695 POLICE OFFICER RECRUIT GN10 $4,659 $4,891 $5,136 $5,393 $5,662 SENIOR ACCOUNT CLERK GN05 $3,748 $3,936 $4,132 $4,339 $4,556 VICTIM ADVOCATE GN07 $3,891 $4,086 $4,290 $4,504 $4,730
MAINTENANCE & CRAFTS EMPLOYEES' ASSOCIATION
BUILDING MAINTENANCE LEAD WORKER MT10 $4,711 $4,946 $5,194 $5,454 $5,727 ELECTRICIAN I MT05 $3,877 $4,072 $4,275 $4,489 $4,714
ELECTRICIAN II MT11 $4,824 $5,065 $5,319 $5,584 $5,864
ELECTRICIAN LEAD WORKER MT13 $5,344 $5,611 $5,892 $6,186 $6,495 EQUIPMENT MECHANIC LEAD WORKER MT12 $5,048 $5,300 $5,566 $5,845 $6,137 EQUIPMENT MECHANIC I MT03 $3,775 $3,964 $4,163 $4,370 $4,589 EQUIPMENT MECHANIC II MT08 $4,459 $4,683 $4,917 $5,163 $5,421 EQUIPMENT OPERATOR MT07 $4,339 $4,556 $4,784 $5,023 $5,274 LANDSCAPE MAINTENANCE LEAD WRK MT15 $4,573 $4,802 $5,041 $5,293 $5,558 MAINTENANCE LEAD WORKER MT09 $4,573 $4,802 $5,041 $5,293 $5,558 MAINTENANCE SVCS COORDINATOR MT14 $5,611 $5,892 $6,186 $6,495 $6,820 MAINTENANCE WORKER I MT01 $3,484 $3,658 $3,842 $4,033 $4,235 MAINTENANCE WORKER II MT02 $3,657 $3,841 $4,032 $4,234 $4,446 MAINTENANCE WORKER III MT04 $3,838 $4,031 $4,231 $4,443 $4,666 SENIOR MAINTENANCE WORKER MT06 $3,911 $4,105 $4,310 $4,526 $4,753 Resolution No. 2024-2 Page 6 of 8
Group/Position Title Grade Code Step 1 Step 2 Step 3 Step 4 Step 5
CITY OF WEST COVINA
FULL‐TIME SALARY SCHEDULE
EFFECTIVE FIRST FULL PAY PERIOD FOLLOWING JULY 1, 2024
MID‐MANAGEMENT EMPLOYEES' ASSOCIATION
ACCOUNTING MANAGER MM21 $7,092 $9,576
ASSISTANT FINANCE DIRECTOR MM31 $12,569 $13,197 $13,846 $14,550 $15,278 ASSISTANT TO THE CITY MANAGER MM25 $7,399 $9,990
CODE ENFORCEMENT MANAGER MM27 $8,004 $10,841
CODE ENFORCEMENT SUPERVISOR MM05 $5,684 $7,673
COMMUNICATIONS MANAGER MM12 $6,608 $8,811
COMMUNICATIONS SUPERVISOR MM03 $5,497 $7,425
COMMUNITY SERVICES MANAGER MM19 $6,607 $8,919
DEPUTY COMM DEVELOPMENT DIRECTOR MM13 $9,094 $12,277
DEPUTY COMM SERVICES DIRECTOR MM07 $8,170 $11,030
DEPUTY FIRE MARSHAL MM14 $6,313 $7,673
DEPUTY PUBLIC WORKS DIRECTOR MM33 $10,370 $10,916 $11,490 $12,094 $12,731 ECON DEVELOPMENT PROJECT COORDINATOR MM16 $6,016 $8,122 ECON DEVELOPMENT/HOUSING MANAGER MM26 $8,003 $10,806
FIRE MARSHAL MM25 $7,399 $9,990
FORENSIC SPECIALIST SUPERVISOR MM18 $8,482 $8,906 $9,351 $9,820 $10,311 HUMAN RESOURCES MANAGER MM20 $8,831 $9,296 $9,785 $10,299 $10,842 INFORMATION TECHNOLOGY MANAGER MM28 $8,800 $11,120
MANAGEMENT ANALYST I MM01 $4,832 $6,521
MANAGEMENT ANALYST II MM16 $6,016 $8,122
PARK MAINTENANCE SUPERVISOR MM06 $5,717 $7,719
PLANNING MANAGER MM29 $8,487 $11,458
POLICE ADMIN SERVICES MANAGER MM22 $7,100 $9,584
POLICE RECORDS MANAGER MM18 $8,482 $8,906 $9,351 $9,820 $10,311 POLICE RECORDS SUPERVISOR MM04 $5,675 $7,659
PRINCIPAL PLANNER MM23 $7,137 $9,636
PROJECT MANAGER MM08 $8,960 $10,891
PUBLIC SERVICES MANAGER MM24 $7,393 $9,980
PUBLIC WORKS SUPERINTENDENT MM30 $8,700 $11,744
PURCHASING MANAGER MM17 $6,322 $8,536
RECREATION SERVICES SUPERVISOR MM02 $5,344 $7,215
RECREATION SUPERINTENDENT MM11 $6,477 $8,745
SENIOR CITIZEN'S SERV SUPERVIS MM02 $5,344 $7,215
SENIOR HUMAN RESOURCES ANALYST MM32 $7,002 $7,352 $7,720 $8,106 $8,512 SENIOR PLANNER MM29 $8,487 $11,458
STREET MAINTENANCE SUPERVISOR MM09 $5,825 $7,865
Resolution No. 2024-2 Page 7 of 8
Group/Position Title Grade Code Step 1 Step 2 Step 3 Step 4 Step 5
CITY OF WEST COVINA
FULL‐TIME SALARY SCHEDULE
EFFECTIVE FIRST FULL PAY PERIOD FOLLOWING JULY 1, 2024
POLICE MANAGEMENT ASSOCIATION
POLICE CORPORAL PD02 $8,189 $8,599 $9,028 $9,479 $9,954 POLICE OFFICER PD01 $7,600 $7,980 $8,379 $8,798 $9,238
POLICE SERGEANT PD03 $9,478 $9,953 $10,450 $10,973 $11,522 POLICE OFFICERS’ ASSOCIATION
POLICE CAPTAIN PM02 $16,721 $19,229
POLICE LIEUTENANT PM01 $15,754 $16,805 $17,951
POLICE SUPPORT SERVICES ASSOCIATION
COMMUNITY SERVICES OFFICER NS03 $3,731 $3,917 $4,112 $4,320 $4,536 FORENSIC SPECIALIST NS08 $5,654 $5,951 $6,264 $6,594 $6,940 JAILER NS04 $3,884 $4,082 $4,284 $4,501 $4,724
LEAD JAILER NS05 $4,275 $4,505 $4,735 $4,966 $5,196
POLICE RECORDS SPECIALIST I NS01 $3,240 $3,405 $3,574 $3,752 $3,940 POLICE RECORDS SPECIALIST II NS02 $3,475 $3,649 $3,833 $4,025 $4,224 PUBLIC SAFETY DISPATCHER NS06 $4,986 $5,235 $5,497 $5,772 $6,060 SENIOR COMMUNICATIONS OPERATOR NS07 $5,584 $5,864 $6,157 $6,464 $6,786 SENIOR FORENSIC SPECIALIST NS09 $6,818 $7,177 $7,555 $7,953 $8,371 Resolution No. 2024-2 Page 8 of 8
AGENDA ITEM NO. 9
AGENDA STAFF REPORT
City of West Covina | Office of the City Manager
DATE: February 6, 2024
TO: Mayor and City Council
FROM: Paulina Morales
Acting City Manager
SUBJECT: PUBLIC HEARING REGARDING THE PROGRAM YEAR (PY) 2024 COMMUNITY
DEVELOPMENT BLOCK GRANT (CDBG) ACTION PLAN
RECOMMENDATION:
It is recommended that the City Council:
1. Conduct a public hearing regarding the PY 2024 CDBG Action Plan; and Direct staff to develop a draft PY 2024 CDBG Action Plan, based on the needs and priorities approved for the PY 2020-2024 Consolidated Plan.
2. BACKGROUND:
The City receives an annual grant of CDBG funds from the U.S. Department of Housing and Urban Development (HUD). CDBG is a federal program with an overall objective of developing viable urban communities by providing decent housing and a suitable living environment, and expanding economic opportunities principally for low- and moderate-income persons.
According to 24 CFR 570.4, the policies and procedures used to determine CDBG allocations are described in Sections 106 and 107 of the Housing and Community Development Act of 1974. For the Entitlement Program, there are two formulas: "A" and "B". HUD calculates the amount of funds that each entitlement grantee would receive under each of the two formulas. Formula A allocates funds to a jurisdiction based on its metropolitan area’s share of three factors across all US metropolitan areas. The factors are:
1. Population, weighted at 25%;
2. People in poverty, weighted at 50%; and
3. Housing overcrowding, weighted at 25%.
Formula B also allocates funds to a jurisdiction based on its metropolitan area’s share of three factors across all US metropolitan areas, but the factors are somewhat different. The Formula B factors are:
1. Population growth lag since 1960, weighted at 20%;
2. People in poverty, weighted at 30%; and
3. Pre-1940 housing units, weighted at 50%.
After HUD runs the calculations using the two formulas, it allocates the grantee the larger amount of the two. However, because HUD uses the larger amount, when it adds all the grantees’ allocations together, the total is higher than the amount of CDBG funding available for the Entitlement Program. So, HUD must recalculate the figures using a pro-rata reduction to reduce the total to the funding level for the Entitlement Program.
The City of West Covina utilizes CDBG funds for the Domestic Violence Victim Advocate, Senior Meals Program, the Home Preservation Program, the Business Assistance Program, Public Infrastructure projects, and to fund various public service providers (i.e., food banks, homeless advocates, meals on wheels, etc.).
As a condition of receiving the funds, HUD requires the City to prepare an annual Action Plan, which details the activities the City plans to undertake with the funds in the respective year. This Action Plan is to be consistent with the five-year CDBG Consolidated Plan, which is a strategic and visioning document on the use of these funds. As a basis for the Consolidated Plan, an assessment and prioritization of community needs, relative to the use of CDBG funds, was required. The categories of community need identified in the current Consolidated Plan are: (1) Economic Development, (2) Homelessness, (3) Infrastructure Improvements, (4) Owner Occupied Housing, (5) Public Facilities, (6) Non-Homeless Special Needs, (7) Public Services, and (8) Rental Housing. Attachment No. 1 describes each category.
To facilitate prioritization and to evaluate the categories, HUD utilizes four levels of priority: High, Medium, Low, and No Such Need. A High Priority means that activities in that category will be funded by CDBG funds. A Medium Priority means activities in that category may be funded by CDBG funds. A Low Priority means CDBG funds will not be used to fund activities in a particular category.
Table 1 shows the PY 2024 CDBG Consolidated Plan prioritization approved on April 6, 2021 and amended on March 1, 2022.
Table 1
PY 2020-2024 Consolidated Plan Priorities
Categories of Need Priority Level
Economic Development High
Homelessness High
Infrastructure Improvements High
Owner Occupied Housing High
Public Facilities High
Rental Housing High
Public Services Medium
Non-Homeless Special Needs Medium
The categories shown as "Medium" and "Low" do not indicate that these are not priorities of the City of West Covina, but with limited CDBG funds, the City Council determined these as the priorities for CDBG funding.
DISCUSSION:
This is the first of two public hearings required by HUD for the adoption of the PY 2024 Action Plan. The purpose of this hearing is to provide an opportunity for citizen input relative to the identification and prioritization of community needs that may be addressed with CDBG funds in PY 2024. Because this hearing occurs prior to the publication of the draft Action Plan, it is referred to as the Pre-Development Hearing.
This public hearing is also the opportunity for the City Council to consider changing the prioritization of community needs for the PY 2024 Action Plan. The City Council retains the ability to fund all priorities as part of the City’s annual budget process and to modify/change priorities of the Categories of Need. The City has not been notified of its PY 2024 allocation as of the writing of this report.
Staff is seeking authorization to draft the PY 2024 Action Plan, based on the priorities established in the five-year Consolidated Plan for PY 2020-2024. Once staff receives such authorization, staff can begin drafting the Action Plan as well as the process of evaluating public service providers and possible capital projects. Once drafted, the Action Plan will be made available for a required 30-day public review period.
Following the review period, the draft will be presented to City Council for consideration in a public hearing. The approved Action Plan is due to HUD no later than August 16, 2024.
LEGAL REVIEW:
The City Attorney's Office has reviewed the staff report.
OPTIONS:
The City Council has the following options:
1. Approve staff recommendation; or
2. Provide alternative direction.
Prepared by: Kelly McDonald, Public Services Manager
Fiscal Impact
FISCAL IMPACT:
This is strictly an administrative item, therefore; there is no fiscal impact associated with this action.
Attachments
Attachment No. 1 - Descriptions of Categories of Need in Table 1 Attachment No. 2 - PY 2024 CDBG Action Plan Pre-Dev - Slides CITY COUNCIL GOALS & OBJECTIVES: Maintain and Enhance City Facilities and Infrastructure Enhance City Image and Effectiveness
ATTACHMENT NO. 1
Descriptions of Categories of Need in Table 1,
Consolidated Plan Priorities
This attachment describes the Categories of Need shown in Table 1 of the staff report.
1. Economic Development: Activities to address these needs will be funded by the Community & Economic Development non-housing funds. Community & Economic Development activities and the new Business Assistance Program will address this category of need.
2. Homelessness: The allocation of CDBG funds to public services can address a portion of these needs.
3. Infrastructure Improvements: Improvements such as street rehabilitation and replacement of curbs and gutters will be funded during the Consolidated Plan cycle. (For example, projects may include street improvements.)
4. Owner-Occupied Housing: Owner housing needs will be addressed by the Housing Preservation Program (HPP).
5. Public Facilities: Public facilities may be funded during the Consolidated Plan cycle – 2020 to 2025. (For example, projects may include: accessibility improvement or parks and recreation facilities and youth centers.)
6. Rental Housing: Rental housing needs are addressed by the Section 8 rental assistance program and the affordable housing developments funded by the CED Low and Moderate Income Housing Fund.
7. Public Services: A high priority was assigned to public services because CDBG funds can help to address the needs of the elderly, frail elderly, youth and other low/moderate income populations. These needs can be addressed by the 15% allocation of CDBG funds to public services. (For example, public services may include: youth services, transportation services, and crime awareness.)
8. Non-Homeless Special Needs: The allocation of CDBG funds to public services can address a portion of the non-homeless needs. (Non-homeless special needs populations include: the elderly, persons with HIV/AIDS, disabled, homebound, and mentally ill).
CITY COUNCIL MEETING
FEBRUARY 6, 2024
PUBLIC HEARING REGARDING PROGRAM YEAR (PY) 2024 COMMUNITY DEVELOPMENT BLOCK
GRANT (CDBG) ACTION PLAN
Public Services Department
ATTACHMENT NO. 2
BACKGROUND
The City of West Covina has utilized these funds for:
DomesticViolenceVictim Advocate (Police Department),
Senior Meals Program
Business Assistance Loan Program
Housing Preservation Program
Public Infrastructure Projects
Public Services (i.e., food banks, meals on wheels, homeless)
PRIORITIZATION
PY 2020-2024
CONSOLIDATED
PLAN Categories of Need Priority Level
Economic Development High
Homelessness High
Infrastructure Improvements High
Owner-Occupied Housing High
Public Facilities High
Rental Housing High
Public Services Medium
Non-Homeless Special Needs Medium
Table 1
PY 2020-2024 Consolidated Plan Priorities
OPTIONS
The City Council has the following options:
Approve staff’s recommendation.
Provide alternative direction.
RECOMMENDATION
That the City Council direct staff to draft the PY 2024 Action Plan based on the PY 2020-2024 Consolidated Plan Priorities, as amended.
AGENDA ITEM NO. 10
AGENDA STAFF REPORT
City of West Covina | Office of the City Manager
DATE: February 6, 2024
TO: Mayor and City Council
FROM: Paulina Morales
Acting City Manager
SUBJECT: CONSIDERATION OF 2023 UPDATE TO THE PAVEMENT MANAGEMENT PROGRAM RECOMMENDATION:
It is recommended that the City Council take the following actions:
1. Receive and file the Updated 2023 Pavement Management Program; and
2. Provide direction regarding whether to implement budget scenario 2 for the 5-year pavement program for a total budget of approximately $25.5 million over 5 years, or budget scenario 3 for the 5-year pavement program for a total budget of approximately $28.8 million over 5 years; and
3. Direct the City Manager to implement the plan.
BACKGROUND:
A Pavement Management Program (PMP) is a planning and budgeting tool used to prioritize street paving and maintenance projects over a five-year period. In order to receive Federal funding for street rehabilitation projects, it is mandated that every mile of eligible Federal-Aid highway within the City (major arterials) be managed with a PMP. Eligibility for State Proposition C funding also requires that a PMP be implemented and updated every three years. A PMP provides a formal systematic approach to assessing, monitoring, and managing the condition of highway pavements in the most cost-effective manner. The results of the study help determine the most appropriate locations and the optimum approach to pavement rehabilitation.
A basic PMP involves dividing the City's street network into segments of approximately one-block lengths. The segments are evaluated by counting the number of cracks, measuring the size and type of cracking and collecting other pavement surface information. The measurements are analyzed mathematically and each segment is given a condition rating number (between 0 and 100) that is used to rank the streets in the order of their conditions. Combined with data on traffic volumes and pavement thicknesses, the program processes the condition data and produces recommendations for which streets to repair, in what order, the optimum method of repair, and the estimated costs. This information is used to prioritize and schedule street rehabilitation through the long-range Capital Improvement Program (CIP) and budget process. The local street system is also monitored and managed by the PMP.
In February 2023, the City awarded a professional services agreement to Bucknam Infrastructure Group to prepare and update the City’s Pavement Management Program.
On December 19, 2023, staff presented to City Council the update on the Pavement Management Program.
Program.
In January 2024, Bucknam completed the final Citywide Pavement Management Program report (Attachment No. 1).
DISCUSSION:
The report presents the findings and recommendations from the development of the system data associated with the pavement condition survey of the City’s street network, including:
Pavement Condition Summaries
Preservation and Repair Activities
Projected Budget Scenarios for Projects based on those Activities PMP is a planning tool, and is updated based on ongoing engineering evaluations:
The recommendations generated by the PMP are for planning purposes only, and are not intended to replace sound engineering judgment for actual construction. The PMP is used as the basis for making strategic decisions to plan future work effectively and cost efficiently. The City Engineer conducts field observations to update and supplement the information in the PMP report to develop cost-effective projects with an efficient cost/benefit ratio based on field conditions, other relevant projects, budget availability, and various other factors that may exist at the time.
Pavement Condition Index (PCI):
The PCI system is a rating mechanism used to describe the condition of the City’s pavement and has been adopted as the nation’s standard rating system by AASHTO and ASTM. Ranging between "0" and "100," a PCI of "0" would correspond to a badly deteriorated pavement with virtually no remaining life, while a PCI of "100" would correspond to a pavement with proper engineering design and construction at the beginning of its life cycle.
Effective Preventative Maintenance Approach:
Preventative maintenance on streets with better than average PCI ratings must be considered in combination with the more extensive rehabilitation of failing streets to realize the maximum net benefit and reduce the long term costs. As a pavement ages, the system predicts the PCI of the pavement based on the deterioration curves. Once a street segment reaches a PCI of 40, the street segment deteriorates at a faster rate per the standard deterioration curve for asphalt pavement.
Condition of City’s pavement:
Per the PMP report, the overall condition of the City of West Covina’s road network is “Fair”, with an average weighted PCI of 71.3. Arterial streets are “Fair” with a PCI of 65.6, local streets are “Good” with a PCI of 75.1 and alleys are “Fair” with a PCI of 64.4.
Replacement value and quantity of pavement:
The pavement network within the City of West Covina has approximately 286.9 miles of paved surfaces, comprised of approximately 114.2 miles of arterial/collector streets, 166.8 miles of local streets, and 5.9 miles of alleys. This equates to approximately 47.6 million square feet of pavement. The estimated replacement value of this pavement is approximately $600 million.
Preservation program and costs:
A strategy was developed based on a 5-year funding cycle. This strategy involves two traditional pavement rehabilitation treatments including both asphalt slurry seal and asphalt concrete overlays as preservation components. The strategy also used a 5% annual inflation factor for all maintenance costs.
The following scenarios have been analyzed:
Scenario 1: Maintain Current Funding Level (Spend $3.2 million per year for 5-year program):
This scenario shows the impact of the City’s anticipated pavement rehabilitation budget of $3.2 million per year over the next 5 years, with a total budget of $16 million over 5 years. This annual million per year over the next 5 years, with a total budget of $16 million over 5 years. This annual budget figure was established on the previous pavement management program update (in 2020) based on construction costs established pre-Covid. Per this scenario, at the end of the 5-year program, the average citywide pavement condition index will significantly reduce to below the State average levels, and therefore, staff does not recommend this scenario. Due to post-Covid materials and construction cost increases and cost inflation, the cost of construction has increased over the past few years. Therefore, staff recommends Council approve Scenario 2 or 3 (presented below) with higher budget figures to maintain or increase pavement network condition.
Scenario 2: Maintain Current Pavement Network Condition (PCI) at 71 (Spend $5.1 million per year for 5-year program):
This scenario shows the impact of the City’s anticipated pavement rehabilitation budget of $5.1 million per year over the next 5 years, with a total budget of approximately $25.5 million over 5 years. Per this scenario, at the end of the 5-year program, the average citywide pavement condition index would remain at the current PCI level of 71. This scenario would address all residential streets within the selected local maintenance zone (1 maintenance zone per year, total of 5 maintenance zones over 5-year program. City has 12 maintenance zones in total).
Scenario 3: Increase Pavement Current Network Condition (PCI) to 73 (Spend $5.8 million per year for 5-year program):
This scenario shows the impact of the City’s anticipated pavement rehabilitation budget of $5.8 million per year over the next 5 years, with a total budget of approximately $28.8 million over 5 years. Per this scenario, at the end of the 5-year program, the average citywide pavement condition index would increase to a PCI level of 73 (2 points increase). This scenario would address all residential streets within the selected local maintenance zone (1 maintenance zone per year, total of 5 maintenance zones over 5 year program. City has 12 maintenance zones in total). In addition to Scenario 2, this scenario would also improve the overall pavement network condition by 2 points to 73.
LEGAL REVIEW:
The City Attorney's Office has reviewed this report.
OPTIONS:
The City Council has the following options:
1. Approve staff's recommendation; or
2. Provide alternative direction.
Prepared by: Okan Demirci, PE, QSD/P
Fiscal Impact
FISCAL IMPACT:
Based on the findings of the pavement management program, staff prepared two fiscal impact analyses based on the total budget scenarios recommended:
Scenario 2: Maintain Current Pavement Network Condition (PCI) at 71 (Spend $5.1 million per year for 5-year program):
Total budget for 2023 Pavement Management Program budget scenario 2 is $25.5 million over 5 years.
This scenario would be funded by SB1 funds first and then Measure M funds. There are sufficient funds under both funding programs, and the table below shows the fiscal impact over the 5-year program, for this budget scenario:
Scenario 2 – Maintain Current Pavement Network Condition (PCI) at 71 (Spend $5.1 million per year for 5 years program)
Fund Beginning
Fund
Balance
FYE 2024 FYE 2025 FYE 2026 FYE 2027 FYE 2028
Funding Sources
224 Measure
R
3,823,000
235 Measure
M
4,855,000 1,930,000 1,988,000 2,048,000 2,109,000 2,172,000 237 SB1 1,160,000 3,277,000 3,375,000 3,476,000 3,580,000 3,687,000 Total Funding
Sources
$9,838,000 $5,207,000 $5,363,000 $5,524,000 $5,689,000 $5,859,000 Expenditures -$5,100,000 -$5,100,000 -$5,100,000 -$5,100,000 -$5,100,000 Remaining
Funds
$9,945,000 $10,208,000 $10,632,000 $11,221,000 $11,980,000 Scenario 3: Increase Pavement Current Network Condition (PCI) to 73 (Spend $5.8 million per year for 5-year program):
Total budget for 2023 Pavement Management Program budget scenario 3 is $29 million over 5 years.
This scenario would be funded using SB1 funds first and then Measure M funds. There are sufficient funds under both funding programs, and the table below shows the fiscal impact over the 5-year program, for this budget scenario:
Scenario 3 – Increase Pavement Current Network Condition (PCI) to 73 (Spend $5.8 million per year for 5 years program)
Fund Beginning
Fund Balance
FYE 2024 FYE 2025 FYE 2026 FYE 2027 FYE 2028
Funding Sources
224 Measure
R
3,823,000
235 Measure
M
4,855,000 1,930,000 1,988,000 2,048,000 2,109,000 2,172,000 237 SB1 1,160,000 3,277,000 3,375,000 3,476,000 3,580,000 3,687,000 Total Funding
Sources
$9,838,000 $5,207,000 $5,363,000 $5,524,000 $5,689,000 $5,859,000 Expenditures -$5,800,000 -$5,800,000 -$5,800,000 -$5,800,000 -$5,800,000 Remaining
Funds
$9,245,000 $8,808,000 $8,532,000 $8,421,000 $8,480,000
Attachments
Attachment No. 1- Pavement Management Program Final Report CITY COUNCIL GOALS & OBJECTIVES: Protect Public Safety
FINAL REPORT
UPDATE OF
PAVEMENT MANAGEMENT PROGRAM
(Citywide)
2023-2028
Submitted to:
City of West Covina, CA
August 21, 2023
100-21
August 21, 2023
Ms. Paulina Morales
Acting City Manager
City of West Covina
1444 W. Garvey Avenue, S 308
West Covina, CA 91790
Subject: Final Report - Update of the Pavement Management Program Dear Ms. Morales:
As part of the 2023 Update of the Pavement Management Program for the City of West Covina, Bucknam Infrastructure Group, Inc. (Bucknam) is pleased to submit the Final Report for the City’s pavement network.
The information contained in this report was used to develop the recommended improvement program for the pavement network. The report covers the following categories:
• Executive Summary (Section I)
• Pavement Management Program Development and Reporting (Section II) • Pavement Conditions For Each Segment in the Network (PCI Report – Section III) The Pavement Condition Index report shows the present condition of each street in the pavement network. In addition, the report shows the basic geometry of each street segment. • Forecast Maintenance & Rehabilitation (FMR) Reports (Section IV) • Recommended Maintenance and Repair Strategies
The recommended maintenance and repair strategies were used to generate the Forecast Maintenance & Rehabilitation Report and were based on our 2023 inspections. Additionally, we have assessed and incorporated unit cost and maintenance application practices/types with our strategies. • Projected Projects based on M&R Strategies
The FMR Report projects the street maintenance activities required for the next five years, broken down to show maintenance levels for Arterials, Collectors, Locals and Alley streets. The data included in this report is organized by fiscal year.
Our thorough analysis of previous and current West Covina PMP strategies enabled our staff to make proactive recommendations to the City’s pavement CIP. All comments received from the City have been incorporated in the reports that follow. All of the City’s issues and needs that were brought to our attention are included in the report. It has been a pleasure working with you and the City on updating your Pavement Management Program. We look forward to the continued success of this project and future teamwork with City staff.
Sincerely,
Bucknam Infrastructure Group, Inc.
Peter J. Bucknam
Project Manager
Infrastructure Management – GIS Services
City of West Covina Page i
2023 Pavement Management Program
Final Report – August 21, 2023
TABLE OF CONTENTS
I. Executive Summary
A. City’s Pavement Network
B. Current Citywide Conditions
C. Maintenance Strategy Development
D. Annual Budget Projections
E. Quality Control Efforts
F. Findings and Recommendations
II. Pavement Management Program-Capital Improvement Program A. PMP Scope of Work
B. Maintenance Strategy Assignments
C. Multi-Year Annual Work Program Projects
i. Maintain 71 PCI Budget
ii. Increase PCI Budget
D. Condition Distribution Report
E. Calculation of PCI
F. Sample Distress Photos – Recommended Treatment
III. Pavement Condition Index (PCI) Reports
A. PCI Reports - Definitions
B. West Covina 2023 PCI Map
C. Name Order (A to Z)
D. PCI Order (0-100)
IV. Forecast Maintenance / Rehabilitation Report
A. Maintain 71 PCI Budget, Five Year Plan (2023-2028)
B. Forecast Maintenance / Rehabilitation Maps – FY 2023-2028 City of West Covina Page ii
2023 Pavement Management Program
Final Report – August 21, 2023
Table and Figure Reference Page #
Figure 1 – Pavement Area (SF) by Street Classification Sec 1-2 Figure 2 – Historical PCI Findings (FY 2017-2023) Sec 1-3 Figure 3 – PCI Distribution by Section Mileage for All Streets Sec 1-6 Figure 4 – Citywide Local Maintenance / Rehabilitation Zone Map Sec 1-9 Figure 5 – Sample Pavement Life Cycle Sec 2-3
Figure 6 – Five Year Projection; Maintain PCI of 71 Budget Sec 2-7 Figure 7 – Necessary Funding to Increase PCI to 73 Budget Sec 2-8 Figure 8 – PCI Calculation Worksheet Sec 2-11
Figure 9 – West Covina MyRoads® PMP Web-Portal Sec 2-12 Figure 10 – Arterial/Collector Condition Distribution Sec 2-13 Figure 11 – Local Condition Distribution Sec 2-13
Figure 12 – Sample Distress Photos – Recommended Treatment Sec 2-14 Figure 13 – 2023 West Covina Pavement Condition Index (PCI) Map Sec 3-4 Figure 14 thru 18 – Forecast Maintenance & Rehabilitation Maps (FY 2023-28) Sec 4-3 Table 1 – Past and Present PCI Results and Comparisons Sec 1-3 Table 2 – Condition Distribution by Section Mileage for All Streets Sec 1-4 Table 3 – Five Year Projection Demonstrating Annual Budget to Maintain PCI of 71 Sec 1-10 Table 4 – Five-Year Projection Demonstrating Annual Budget to Increase PCI to 73 Sec 1-10 Table 5 – Pavement Condition Index (PCI) Ranges Sec 2-2 Table 6 – Maintenance Strategy Assignments Sec 2-2
Table 7 – Necessary Funding to Maintain PCI of 71 Sec 2-6 Table 8 – Necessary Funding to Increase PCI to 73 Sec 2-8 Acronym Listing
American Society for Testing and Materials (ASTM)
Army Corps of Engineers (ACOE)
Asphalt Concrete (AC)
Asphalt Rubber Hot Mix (ARHM)
Average Daily Traffic (ADT)
Capital Improvement Program (CIP)
Geographic Information System (GIS)
High Density Mineral Bond (HDMB)
Los Angeles County MTA (METRO)
Maintenance and Repair (M&R)
Pavement Condition Index (PCI)
Pavement Management Program (PMP)
Portland Cement Concrete (PCC)
City of West Covina Page 1
2023 Pavement Management Program
Final Report – August 21, 2023 Section I
SECTION I
EXECUTIVE SUMMARY
2023 UPDATE OF PAVEMENT MANAGEMENT PROGRAM
This report reflects the continued commitment and proactive management of the City’s Pavement Management Program (PMP); the last major update to the City’s PMP was performed in 2020. As the City of West Covina continues to show growth in its population, demographics, infrastructure and maintenance needs, the street network is demonstrating similar needs in regard to capital revenues and capital improvement program management.
Today, the City is currently using the Metropolitan Transportation Commission (MTC) pavement management program, StreetSaver, to manage the 286.9 miles within street network. This software is essential to the City in that it assists Public Services staff in identifying what levels of annual funding are needed to maintain and/or improve the pavement conditions across the network. These funds are vital for the annual arterial / collector street capital improvement program projects as well as for costeffectively managing the local network through proactive cyclical maintenance/rehabilitation and scheduling. Under this project, the City has incorporated the update of its unique Pavement Management – GIS MyRoads® PMP web-portal and GIS layers that assist the City in spatially analyzing pavement conditions and economic needs for a given pavement segment or citywide.
The West Covina PMP has been developed to assist City personnel by providing current data on the City street networks and to develop cost-effective maintenance / rehabilitation strategies to maintain a desirable level of pavement performance on a network scale; this optimizes the expenditure of limited fiscal resources. The PMP efforts in 2023 consisted of analyzing the City’s previous PMP dataset for quality and usability. City staff also provided key information pertaining to the ongoing maintenance/rehabilitation efforts that have occurred throughout the City since 2020. In doing this, we were tasked to generate an updated Capital Improvement Program report that identified deficiencies and recommendations in the current operating and maintenance efforts put forth by the City.
For the 2023 project, our staff surveyed all arterial and collector routes to assist the City in complying with Los Angeles County MTA (METRO) PMP requirements as well as surveyed all local/alley streets sections and analyzed historical maintenance / rehabilitation operations.
Specifically, the program provides administrators and maintenance personnel with:
• The present condition status of the pavement network (arterial, collector, and local streets), as a whole and of any grouping or individual component within the City; • A ranked list of all streets, or segments of streets, by condition within the network; • Rehabilitation/maintenance needs of qualifying street segments by year; • An optimized priority maintenance and rehabilitation program based on cost/benefit analysis and various levels of funding;
City of West Covina Page 2
2023 Pavement Management Program
Final Report – August 21, 2023 Section I
• Optimum annual budget levels for pavement maintenance for the current and the following five (5) years;
• Prediction of the future performance of the City’s pavement network and each individual street section; and
• Pavement network and conditional data presented in ArcGIS that is compatible with City’s existing GIS Enterprise
Pavement is a dynamic structure where deterioration is constantly occurring; thus the pavement management system needs to be updated on a regular basis to reflect these changes in pavement conditions, pavement maintenance histories, and maintenance strategies based upon budgetary constraints. In our approach to develop the City’s forecasted maintenance recommendations we worked with West Covina staff in identifying unit costs for all maintenance practices used on an annual basis.
Currently, based upon the City’s maintenance practices and their associated unit costs, the total replacement value of the pavement network is $600,690,000. This value clearly indicates that the City’s pavement network is the most valuable and essential asset to West Covina. The City’s use of slurry seal, ARHM Overlay and R&R practices are typically applied at a five year, ten year and 25 year frequency respectively. These frequencies are typical but the City may see increases in deterioration rates due to environmental, load and high average daily traffic (ADT) volumes. For example, high ADT volumes along one of West Covina’s arterial streets will increase deterioration rates for a previously applied AC Overlay compared to a small local street. These deterioration rates are monitored through frequent inspections and functional class deterioration analysis within the City’s PMP database.
This report reflects our findings and recommendations for the PMP and the current state of the City’s pavement network. Furthermore, we have recommended detailed funding and maintenance strategies for the arterial/collector and residential networks for next five (5) years.
CITY’S PAVEMENT NETWORK
Within the West Covina Arterial/Collector
pavement network consists of approximately 114.2
section miles of streets, 18,111,498 SF of AC/PCC
pavement that is made up of 448 pavement
sections. The Local network consists of approx.
166.8 section miles of streets, 29,622,018 SF of
pavement which includes 1,270 pavement
sections. The Alley network consists of approx. 5.9
section miles, 627,894 SF of pavement which
includes 48 sections. Combined, the entire
network consists of 286.9 section miles of streets,
47,638,280 SF and 1,766 total pavement sections.
The City’s pavement network is broken down into manageable groups that have similar characteristics, such as pavement rank, surface type and logical segmentation. Pavement segments are identified by their branch and section numbers. Pavement “branches” that have a common usage, such as Garvey Avenue, defines a “branch” within StreetSaver. Pavement “sections” are pavement segments Figure 1
City of West Covina Page 3
2023 Pavement Management Program
Final Report – August 21, 2023 Section I
within the defined branch that have consistent pavement rankings, construction/maintenance histories and use. Representative inspection samples are then selected and visually surveyed to locate distress data. This data is used to calculate the pavement sections Pavement Condition Index (PCI) which includes distress type, extent of the distress and its severity.
The PCI is a condition rating that ranges from 100 (a new pavement section or recently overlaid or reconstructed) to 0 for a section that has structurally failed and deteriorated dramatically. Weighted average PCI of a given area/zone equals the pavement sections PCI multiplied by its own area then divided by the total square footage of the given area/zone. Table 1 summarizes the section conditions found within the City of West Covina pavement network by rank. • The weighted avg. PCI for the City of West Covina ARTERIAL / COLLECTOR network is 65.6 • The weighted avg. PCI for the City of West Covina LOCAL network is 75.1 • The weighted avg. PCI for the City of West Covina ALLEY network is 64.4 The weighted PCI value associated with the Arterial and Local routes shown through our survey analysis is timely in that it demonstrates the results of proactive pavement management. Furthermore, it is showing that a moderate amount of preventative, slurry seal, and overlay work will be needed over the next several years to achieve a “preventative maintenance” level network PCI. The City is proactively scheduling and funding its PMP to reach a citywide weighted PCI of 73 within the next five years.
Table 1 – Past and Present PCI Results and Comparisons
Figure 2 – Historical PCI Findings (FY 2017-2023)
City of West Covina Page 4
2023 Pavement Management Program
Final Report – August 21, 2023 Section I
CURRENT CITYWIDE CONDITIONS (ARTERIALS-COLLECTORS AND LOCALS) The overall condition of the City’s pavement network is “Fair” with a weighted average PCI of 71.3 based on the surface area of each segment (this is a 4.3 PCI increase or a 8% increase compared to 2020 results).
The distribution of the City’s overall pavement network is shown in Section III of this report (Condition Distribution).
Table 2 – Condition Distribution by Section Mileage for All Streets For comparison, Bucknam performed
pavement management studies for several
other Los Angeles County agencies and
have included their weighted PCI values
(right).
As shown above, a large majority of
segments are evenly distributed through all
five condition categories (Very Good to
Poor, excluding Very Poor). For a network in “preventive” condition status you would typically see Very Good to Good section percentage totals at the 55% to 60% range; West Covina’s network currently shows 45% of its sections within these PCI ranges. These findings indicate that the proper funding of the network needs to improve over the next five years; this will allow Public Services managers/staff to proactively establish preventative and rehabilitation schedules that will generate further high-value ROI for the City.
At a minimum, to sustain this asset, continued amounts of overlay rehabilitation and slurry seal maintenance needs to be budgeted for and performed across all areas of the pavement network.
As shown in Table 2, 55% of the City’s entire network falls within the fair, poor and very poor condition categories based on the PCI findings, highlighting the need for continued funding and implementation of proactive slurry seal & overlay projects. Increased overlay rehabilitation activity will improve the City’s overall weighted PCI while reducing deferred maintenance costs in future fiscal years. Overlay projects applied to appropriate, qualifying segments is necessary to increase the overall PCI to a preventative condition status as described above. A network-wide preventative condition status is typically a network with a weighted average PCI over 75.
Regarding the Local network, detailed inspection analysis shows that 47% (78.3 miles) of the local pavement network requires slurry seal maintenance activity while 20% (33.0 miles) requires overlay rehabilitation or full reconstruction.
City of West Covina Page 5
2023 Pavement Management Program
Final Report – August 21, 2023 Section I
With the major amount of Local sections needing rehabilitation the City should proactively appropriate the necessary amount of annual overlay funding to improve the network to a higher condition level. The Local network has shown moderate improvement over the past five years however it will continue to be a major contributor to the high amount of deferred rehabilitation cost burdens unless appropriate pavement funding is applied.
In regard to the Arterial / Collector network, detailed inspection analysis showsthat 29% (32.9 miles) of the network requires slurry seal maintenance activity while 42% (47.5 miles) requires overlay rehabilitation or full reconstruction. With the overall PCI in the mid-60’s, proactive planning and application of scheduled overlay projects needs to be established; this will improve the overall conditions while freeing up additional funding for deferred projects. With the supplement of SB1/Prop C/RMRA/Measure M/Measure R monies coming to the City this fiscal year additional projects can be schedule and expedited over the next three years.
Through our assessment of the City’s annual pavement management budget allocations (FY 2023-2028) the lack or major reduction of necessary CIP funds will cause the City’s citywide weighted PCI to decrease over the next five years if additional funding is not appropriated.
Furthermore, as large overlay and rehabilitation projects are considered for funding, the City should also consider using sub-grade R - Values, structural design, distress severities and extents as parameters for determining whether a pavement section that lies within the Poor to Very Poor condition range should be overlaid or reconstructed.
PCI conditions reflect “surface” conditions; additional sub-surface data such as coring data, R-Values and ground penetrating radar (GPR) will provide City to with a better approach to the maintenance that should be applied.
Our 2023 findings reflect the proactive management the PMP network over the past several years. This is evident in the moderate overall increase in citywide weighted PCI since 2020. As the City strives to achieve a more preventative state of M&R, cost efficient Arterial/Local rehabilitation, zone maintenance schedules and proactive use of available SB1/Measure M/Measure R/Proposition C overlay funding should remain the focus.
City of West Covina Page 6
2023 Pavement Management Program
Final Report – August 21, 2023 Section I
Figure 3 – PCI Distribution by Section Mileage for All Streets
MAINTENANCE STRATEGY DEVELOPMENT
Based on the results of the condition survey and input from the City, pavement maintenance/rehabilitation strategies were developed. From the onset, the City and Bucknam staff identified a distribution of City maintenance funds that would be applied to the network over the next five years. This was based upon the desire to prevent the decrease in street conditions and not allow an increase in the maintenance backlog funds over the five-year program.
Through our assessment and discussions with the City we were requested to identify what level of funding would be required to maintain the current PCI as well as identify the level of funding needed to increase the PCI to 75. With this approach, Bucknam has recommended a “minimal level of service” which creates a major dividing line in determining between preventive maintenance and major pavement rehabilitation.
Generally within pavement management programs, a PCI range between 55 to 70 determines the threshold of when preventive or major overlay rehabilitation is activated. Based on the City’s weighted average PCI, condition distribution, maintenance practices, our team has identified a PCI of “65” as the minimum level of service. This means, in most cases, that any pavement section with a PCI greater than 65 will be recommended for preventive maintenance (i.e. slurry seal). This recommendation is indicated in Table 6, Section II.
Bucknam developed two multi-year Capital Improvement Programs for the City based on the pavement records, yearly capital expenditures, available funding and the most recent 2023 inspections. These recommendations and results are shown in Section II of this report where, for example, we have demonstrated what level of funding is necessary to improve the current weighted condition level of 71 to a level of 73 by FY 2028.
City of West Covina Page 7
2023 Pavement Management Program
Final Report – August 21, 2023 Section I
As shown above in Figure 3, 54% of the City’s streets are in Good to Fair condition. These sections will be targeted for “preventive” maintenance within our Capital Improvement Program (CIP) recommendations.
The reasoning in doing this is to extend the life cycles of those “good” pavement sections which accrues capital saving to aggressively rehabilitate those pavement sections that are below the “minimal level of service”.
In order to achieve the most effective and optimum program for the City, certain strategies have been selected and/or analyzed. Below is a listing of the maintenance activities utilized in strategy development.
Each activity is representative of the types of work that have been programmed as part of the long-term maintenance requirements of the City’s street network.
General Repairs-Stop Gap (Localized Maintenance*); PCI Range – 20 to 95 For this maintenance type, small localized surface treatments are utilized as “holding action” solutions (stop gaps) to delay the need for pavement structural strengthening. They typically include activities such as crack sealing, AC deep patching, AC skin patching, PCC slab replacement, grinding and leveling.
Microsurfacing - (Global Maintenance*); PCI Range – 60 to 85 Microsurfacing is similar to slurry seal. It consists of the application of a mixture of water, asphalt emulsion, aggregate (very small crushed rock), and chemical additives to an existing asphalt concrete pavement surface. Polymer is commonly added to the asphalt emulsion to provide better mixture properties. The major difference between slurry seal and microsurfacing is in how they “break” or harden. Slurry relies on evaporation of the water in the asphalt emulsion. The asphalt emulsion used in microsurfacing contains chemical additives which allow it to break without relying on the sun or heat for evaporation to occur. Thus, microsurfacing is an application that hardens quicker than slurry seals and can be used when conditions would not allow slurry seal to be successfully placed. Streets that have a lot of shade and streets that have a lot of traffic are good candidates for microsurfacing (source - LA County of Public Works).
Slurry Seals (Global Maintenance*); PCI Range – 60 to 85 Surface treatments applied to pavements with minimal surface distress to provide new wearing surfaces and extend pavement life. Generally consists of a mixture of conventional or latex-modified emulsified asphalt, well-graded fine aggregate, mineral filler and water placed over an existing AC surface; Slurry seal application life-cycles are averaging 4 to 5 years. Type II Slurry is recommended for Local streets.
Cape Seals (Global Maintenance*); PCI Range – 40 to 65
This is an application of a single layer of asphalt binder to a road surface immediately followed by a single layer of cover aggregate (chips). The single layer chip seal is then followed with a slurry seal application; Conventional cape seal application life-cycles are averaging 6 to 7 years. For sections that have lower PCI’s in this range, leveling courses should be considered. City is currently considering this application as an alternative cost-saving tool. Currently not used by the City.
City of West Covina Page 8
2023 Pavement Management Program
Final Report – August 21, 2023 Section I
Overlays (Major Rehabilitation*); PCI Range – 20 to 65
AC Overlay – Placement of a layer of hot-mixed asphalt concrete over the existing pavement surface (may include pavement fabric). Grinding (milling) is performed prior to the overlay to reduce the total height of asphalt and assure alignment with existing gutter lines. This also includes “dig-outs” and crack sealing prior to the application of an overlay. This treatment provides a new wearing surface and increased structural strength to the pavement section. A conventional overlay should be designed for a ten-year life.
Asphalt Rubber Hot-Mix Overlay - The ASTM definition is: Asphalt-Rubber is a blend of asphalt cement, reclaimed tire rubber and certain additives in which the rubber component is at least 15% by weight of the total blend and has reacted in the hot asphalt cement sufficiently to cause swelling of the rubber particles. Specifically, using crumb rubber modified binders in pavement application benefit local agencies in that cities find:
• Pavement resists cracking by being more flexible;
• Cost savings come from a longer life cycle (from Bucknam’s experience typically 20% longer), decreased maintenance and the use of less material
• Improvement in skid resistance;
• Decreased noise; and
• It provides long-lasting color contrast for marking and striping • Life cycles are averaging 8 to 12 years
Reconstruction (Major Rehabilitation*); PCI Range – 0 to 20 Reconstruction of an existing pavement section includes demolition and removal of the asphalt to a prescribed depth, grading, sub-base compaction, application of a binder/surface course followed by the placement of a conventional flexible pavement section using a structural AC Hot Mix, ARHM or a full depth asphalt. Each classification of road has a typical design cross-section based on anticipated traffic loading. Reconstruction resets a roadway section PCI to 100 and restarts the life-cycle deterioration curve of the section.
*Localized, Global and Major maintenance activities are default terms used within the StreetSaver pavement software. Specific pavement repair applications are placed within each maintenance activity in order to develop multi-year maintenance forecast recommendations.
City of West Covina Page 9
2023 Pavement Management Program
Final Report – August 21, 2023 Section I
CITYWIDE LOCAL MAINTENANCE / REHABILITATION ZONE MAP
Figure 4 – Citywide Local Maintenance / Rehabilitation Zone Map City of West Covina Page 10
2023 Pavement Management Program
Final Report – August 21, 2023 Section I
ANNUAL BUDGET PROJECTIONS
The budgeting process was approached with the following in mind; generate two (2) unique work programs for the next five (5) years based upon actual road pavement conditions in order to:
1. Identify the required annual citywide budget to “maintain 71 PCI” within five years; and
2. Identify the required annual citywide budget to “increase PCI” within five years; Table 3 – Five-Year Projection Demonstrating Annual Budget to Maintain PCI of 71 Table 4 – Five-Year Projection Demonstrating Annual Budget to Increase PCI to 73 Our findings within Table 4 demonstrate the continued ROI that will result if proper annual funding is applied. By applying approximately $5,754,500/yr ($28,772,300 over five years); the City will continue to see positive results with overall PCI, and sustainment of deferred preventative maintenance and overlay rehabilitation.
Additional detail and breakdown of budget projections are demonstrated in Section IV of this report.
All work program budgets generated are presented in terms of current 2023 dollars. All repair activities were based on distresses observed at the time of the field survey. These are recommendations and are to be used as “the best case scenario” for improving the City of West Covina street network.
City of West Covina Page 11
2023 Pavement Management Program
Final Report – August 21, 2023 Section I
QUALITY CONTROL EFFORTS
Quality control efforts begin at the notice-to-proceed; this involved a full assessment of the previous PMP spreadsheet as well as available GIS data associated with the City of West Covina street network. The PMP data was then accessed through the City’s active StreetSaver license; this allow Bucknam to assess, identify and improve key components of the West Covina PMP.
During our assessment of the previous PMP data, it came to our attention that there were some significant issues with the previous dataset. These issues included inaccurate segmentation, length, width, and true area values, and inspections that did not follow ASTM D6433 standards. Bucknam staff individually reviewed every section across the network to ensure all sections contain similar pavement type, age, and condition. Additionally, length, width, and true area values were corrected for all sections which enhances the accuracy of our budgetary modeling and cost estimations.
Through our internal quality control efforts, we also found multiple sections that were missing from the previous database. All new sections were added to the PMP database and included in our survey efforts.
We believe that all public street sections have been identified, inventoried, and surveyed under this project.
City of West Covina Page 12
2023 Pavement Management Program
Final Report – August 21, 2023 Section I
FINDINGS AND RECOMMENDATIONS
Arterials/Collectors
The actual workload requirements identified indicate that the Arterial/Collector street network is currently in “Fair” condition (PCI = 65.6). To improve this condition, it is essential that preventive maintenance and overlay rehabilitation activities are funded at the levels identified in Table 4 to increase the network weighted average PCI value to within the “Good” condition category.
Our arterial/collector findings for conditional data and recommendations for revenue expenditures are shown below:
• The Arterial/Collector network has a weighted PCI of 65.6; • Currently, 42% of the arterial/collector network (approx. 47.5 miles) qualify for overlay/reconstruction rehabilitation; 29% (approx. 32.9 miles) qualify for slurry seal maintenance;
• At a minimum, Arterial/Collector maintenance projects should focus on achieving and maintaining the a PCI of 65+ within the next five years;
• Develop a proactive fiscal and planned approach to identify arterial/collector overlay projects based on the deterioration modeling within StreetSaver; • Increase the arterial/collector revenues at the levels shown within the Section IV Forecast Maintenance & Rehabilitation (FMR) Report for a minimum of five years to generate the results identified within this report;
• Reassess/re-evaluate the arterial/collector rehabilitation budget programs every two years to improve on CIP forecasts for 2023-24 and beyond to ensure the results shown in Table 3 or 4; • Perform pavement inspections on the arterial/collector network every three years to build a solid planning model within StreetSaver/MyRoads® to track PCI deterioration; • Demonstrated budget shown in Table 4 is ample to improve upon the arterial weighted PCI of
65.6 through five years, additionally, the citywide deferred backlog sustains at level of $45 million over the five years program; and
• Bucknam recommends that the City proactively budget overlay/rehabilitation projects at the levels shown in Table 4 in order to improve upon the conditions found today as well as greatly reduce the amount of deferred maintenance across the City City of West Covina Page 13
2023 Pavement Management Program
Final Report – August 21, 2023 Section I
Locals
The actual workload requirements identified indicate that the Local street network is currently in “Good” condition (PCI = 75.1). To improve this condition, it is essential that preventive maintenance and overlay activities are funded at the levels identified in Table 4 to increase the network weighted average PCI value within the “Good” category PCI range.
Our Local findings for conditional data and recommendations for revenue expenditures are shown below:
• The Local network has a weighted PCI of 75.1;
• Currently, 20% of the Local network (approx. 33.0 miles) qualify for overlay/reconstruction rehabilitation; 47% (approx. 78.3 miles) qualify for slurry seal maintenance; • At a minimum, Local maintenance projects should focus on achieving and maintaining a weighted PCI above a level of 75+ within the next five years;
• Current Local Forecast Maintenance & Rehabilitation (FMR) recommendations should be followed as shown in Section IV reporting;
• Develop a proactive fiscal and planned approach to identify Local overlay projects based on the deterioration modeling within StreetSaver;
• Reassess/re-evaluate the Local rehabilitation budget programs every three years to improve on budget forecasts for 2023-24 and beyond to ensure the results shown in Table 3 or 4; • Perform pavement inspections on the Local network every three years to build a solid planning model within StreetSaver/MyRoads® to track PCI deterioration; and • Demonstrated budget shown in Tables 4 is ample enough to sustain the Local weighted PCI; proactive overlay funding needs to be implemented to see these results. Additionally, the citywide deferred backlog sustains at a level of $45 million over five year program; and • Bucknam recommends that the City proactively budget overlay/rehabilitation applications at the levels shown in Table 4 in order to improve upon the conditions found today as well as greatly reduce the amount of deferred maintenance across the City City of West Covina Page 1
2023 Pavement Management Program
Final Report – August 21, 2023 Section II
SECTION II
PAVEMENT MANAGEMENT PROGRAM – CAPITAL IMPROVEMENT PROGRAM Bucknam Infrastructure Group, Inc. (Bucknam) performed the following services in accordance with the scope of services that was contracted with the City of West Covina. As a quick overview, the following tasks were performed to complete the work over the past several months:
2023 Pavement Management Work Efforts:
Task 1: Project Kickoff-Data Management
Task 2: Update of Maintenance Activities
Task 3: Pavement Condition Survey (approx. 286.9 miles) Task 4: Budgetary Analysis and Capital Improvement Reports Task 5: Executive Summary and Final CIP Reports
Task 6: Mapping of the Pavement Network
Pavement Management Program Update 2023
As a part of the 2023 update of the pavement management program, a major element of work was to complete a comprehensive assessment of the existing street network and PMP database within the City.
This included assessing the City’s existing 2020 StreetSaver dataset, GIS, street naming conventions and work history information. From there, Bucknam worked with the City to confirm public and private street listings which set the foundation for accurate CIP reporting. All data was then updated into the City’s StreetSaver database.
Work history information was provided by the City in the form of completed bid documents, institutional knowledge, and previous dataset and Excel documents. This information was entered into the proper pavement segments that match the limits of those projects. From there, CIP pavement recommendations were performed (discussed and demonstrated below) where the pavement maintenance information the City provided (PMP material practices, unit costs, and capital budgets) were used to generate recommendations through the StreetSaver system.
Table 5 demonstrates PCI ranges utilized for PCI calculations and reporting. Once a pavement inspection is complete, a PCI is calculated for each pavement section. Each PCI calculated falls within a defined PCI range category (Very Good, Poor, etc.). Furthermore, a weighted PCI was calculated for each functional class within the network (arterials and locals).
The PCI is a condition rating that ranges from 100 (a new pavement section or recently overlaid or reconstructed) to 0 for a section that has structurally failed and deteriorated dramatically. Weighted average PCI of a given area/zone equals the pavement sections PCI multiplied by its own area then divided by the total square footage of the given area/zone. This information can also be represented through StreetSaver to show how much square footage or percentage of area falls within a PCI range category.
City of West Covina Page 2
2023 Pavement Management Program
Final Report – August 21, 2023 Section II
Table 5 – Pavement Condition Index (PCI) Ranges
The summary of all roads condition data and their representative PCI's can be seen in the Pavement Condition Report in Section III.
STRATEGY ASSIGNMENT TABLE
The City was requested to provide a pavement maintenance list that demonstrated what pavement applications were currently being used and to provide their associated unit costs; from there a Maintenance Strategy Table was defined within the system that provided recommended actions to the specific repair needs of a street or a grouping of streets.
Strategy Assignment Table
Table 6 – Maintenance Strategy Assignments
The Strategy Assignments List, shown in Table 6, was developed to identify the most critical segments in each of the work programs (Arterial, Collector and Local). Segment priorities were established by determining the range of PCI's requiring first attention based on the relative value of each segment’s PCI, thus maximizing the annual maintenance budget. Also, distress quantity, area extent, type and severity were critical elements in the decision process for recommending maintenance. The assignment table is used as a guide within StreetSaver to recommend maintenance, however, further assessment by City staff and/or outside parties can override maintenance recommendations.
City of West Covina Page 3
2023 Pavement Management Program
Final Report – August 21, 2023 Section II
This can be done by reviewing and assessing distress extents and their weighted percentages.
Once the strategy assignments were set within the system, budgets and work assignments were generated for each work program on an annual basis. Using pavement deterioration curves for each type of pavement surface and class of road, both current year and future years work requirements for each pavement segment within the City were determined. In forecasting the maintenance requirements in future years, the current PCI value is reduced annually for each pavement segment based on the StreetSaver deterioration curves within the City’s database.
Likewise, maintenance activities performed in a given year increase the PCI value as they are applied to the segment. The overall program is dynamic in that each strategy consists of a cyclic series of actions that simulates the pavement anticipated life cycle.
Strategy Assignment Notes
1. Unit costs from the City’s most recent construction bids were used;
2. 30% contingency costs were applied to pavement material costs; additional soft costs that were not included were:
a. Right-of-way improvements
b. Curb & gutter improvements
c. ADA ramp improvement
d. Utility improvement
e. Tree removals
3. Bucknam applied a 5% inflation rate on the annual budget within forecast maintenance & rehabilitation projections (Section IV)
Figure 5 – Sample Pavement Life Cycle
City of West Covina Page 4
2023 Pavement Management Program
Final Report – August 21, 2023 Section II
MULTI-YEAR ANNUAL WORK PROGRAM PROJECTIONS
The goal of these projections is to assist City policy makers in utilizing the recommendations of the StreetSaver system. By using the City of West Covina’s current budgets and maintenance practices the system will develop “section unique” improvements and strategies. Qualifying segments will be tied to a specific fiscal year. As shown in the following pages, we have assessed the budgets that have been projected to meet the maintenance and rehabilitations needed to maximize the City’s return on investment. The budget forecasting goal for the City network focused on:
Establishing a proactive multi-year Maintenance & Rehabilitation Program; Developing a preventive maintenance program; and
Selecting the most cost-effective repairs based on City strategies MAINTAIN PCI BUDGET – The Maintain PCI budget was generated for the City to demonstrate what level of annual funding is required to sustain the overall weighted PCI of 71 for the next five years.
INCREASE PCI BUDGET – A recommended budget was generated for the City to demonstrate the necessary funding that is required to increase the current weighted PCI level of 71 to 73 within five years. *All multi-year budget projections include a 5% inflation rate for the term of the budget forecast.
City of West Covina Page 5
2023 Pavement Management Program
Final Report – August 21, 2023 Section II
ARTERIAL-COLLECTOR / LOCAL
BUDGET PROJECTIONS
City of West Covina Page 6
2023 Pavement Management Program
Final Report – August 21, 2023 Section II
MAINTAIN PCI PROGRAM (FIVE YEAR MODEL)
With the City striving to show proactive maintenance/rehabilitation across all City pavements, a budget program was generated to show the greatest return on investment through the application of slurry seal, grind/overlay and alternative overlay rehabilitations. Our goal under this model is to maintain the current 2023 weighted PCI of 71 after a five-year program. This model will demonstrate the necessary funding to achieve this goal. Assessing all work history, current PCI and relevant unit costs for construction a realistic and achievable annual budget was achieved.
The Maintain Program incorporates pavement sections that have a functional class of Arterial (A, C), Local (R) and Alleys (O).
Table 7 – Necessary Funding to Maintain PCI of 71
Referring to Table 7, it is noted that the weighted PCI remains at a PCI of 70/71 pace throughout the fiveyear projection. Furthermore, the resulting deferred maintenance backlog shows that it increases from $42.2 million to $52.1 million after the five years program which indicates that an annual $5,104,200 budget is not ample enough to chip away at the deferred maintenance on the network. If the City were to reduce their annual funding to a level of $3 Million/yr major overlay projects would continue to be delayed thus increasing the overall deferred maintenance to a level of $78 million after five years.
We recommend that a strong focus be placed on the Arterial network improvements within the first four years due to the fact that the network has a worse weighted PCI than the Locals. We still recommend comprehensive zone maintenance to the Local network through localized patching, slurry seal and through the use of SB1/Measure M/Measure R funds.
DEFERRED MAINTENANCE
Delaying repairs on streets where pavement condition indicates a need creates deferred maintenance. Deferred maintenance includes pavement maintenance / rehabilitation that is needed across the entire network, but cannot be performed due to the lack of available funding and is pushed to the next budget cycle. The actual repairs that are being deferred are often referred to as a “backlog”. As maintenance is deferred, the opportunity to apply life extending preventive pavement applications is lost and the ultimate cost of rehabilitation multiples.
City of West Covina Page 7
2023 Pavement Management Program
Final Report – August 21, 2023 Section II
Figure 6 – Five-Year Projection; Maintain PCI of 71 Budget Continuing to work within the City’s established twelve (12) local slurry/overlay M&R “zone” strategy should be considered for several reasons. With the City applying continued localized maintenance efforts, four beneficial impacts occur:
1) Planned / Maintenance areas are addressed every five years which creates a dedicated project schedule for City staff and constituent inquiries; 2) Deferred overlay rehabilitation can be addressed in a more effective manner due to accrued revenues
3) A preventative maintenance strategy is more cost-effective in a long-term PMP rather than implementing a maintenance approach that addresses only the “worst-first” streets. 4) All maintenance alternatives are available due to the increased funding and focused maintenance within one zone per year.
On the negative side, if low weighted PCI values occur within a given zone, all streets within that zone may not be able to be addressed with maintenance when that zone is scheduled for maintenance. The deferred maintenance will have to be scheduled for future years or simply will have to wait until the zone cycle repeats.
Additionally, it is recommended that the City continue to monitor/consider the potential application of Cape Seal as an asphalt application alternatives for the specific local sections. Specific sections are now qualifying for maintenance that warrants a stronger application rather than a typical slurry seal or a more costly overlay. With a five year cycle in motion, it is essential to address local sections that have PCI’s less than 65 with the proper maintenance since crews will not be back within that area for several years.
City of West Covina Page 8
2023 Pavement Management Program
Final Report – August 21, 2023 Section II
INCREASE PCI TO 73 PROGRAM (FIVE YEAR MODEL)
Based on the results of the Maintain PCI model, a $28.8 Million/5-Yr budget program was applied to current conditions to identify a major goal for the West Covina PMP. Again, we used the “Maintain PCI” PMP models (shown above) as a basis for our modeling within the “Increase PCI” program. Building upon the results of the previous reporting model we increased the amount of funding available for overlay/rehabilitation efforts. The “Increase PCI” program incorporates pavement sections that have a functional class of Arterial (A, C), Local (R) and Alley (O).
Table 8 – Necessary Funding to Increase PCI to 73
Referring to Table 8, it is noted that the weighted PCI increases proactively through the five-year term (71 to 73). Additionally, the annual deferred maintenance total sustains at a level of $45 million over the fiveyears. If the City utilizes an average annual budget of $5,754,500/yr for slurry, overlay, and reconstruction rehabilitation as shown above, the City will be able to “increase” the current conditions and will see a proactive management of the deferred backlog (mostly overlay rehabilitation) by fiscal year 2027. We recommend that a focus be placed on the Arterial network improvements due to the fact that the weighted PCI is now in the mid-60’s. We still recommend consistent Local zone-based approach to maintenance within this term as well.
Figure 7 – Five Year Projection; Increase PCI to 73 Budget City of West Covina Page 9
2023 Pavement Management Program
Final Report – August 21, 2023 Section II
PAVEMENT MANAGEMENT PROGRAM REPORTS
In addition to the annual budget scenario, this report contains a comprehensive and complementary assemblage of pavement management reports ranging from summary reports to annual maintenance and rehabilitation schedules (Forecast Maintenance & Rehabilitation (FMR) Report, Section IV). Collectively as well as individually, the reports represent reasonable projections of pavement maintenance needs and performance based on visual condition assessments, unit cost estimates, and pavement deterioration models.
It is important to note that pavement segment dimensions and surface area recorded during 1999-2020, and 2023 inspections, along with the action and repair costs, as presented within the reports are accurate within tolerable limits. This is noteworthy due to the "implied" accuracy of reporting length and width to the nearest foot, surface area to the nearest square foot, and action and repair unit costs and project estimates to the nearest penny and dollar, respectively.
NEXT STEPS
As with any infrastructure management software program, time investments need to be made by key Public Services staff to maintain the integrity of the data as well as the accuracy. Bucknam can perform training sessions in the use of the StreetSaver tools and demonstrate how to generate standard commonsense reports to assist City staff in developing yearly budgets, project level analysis, and CIP projections.
This will be key to future management of the pavement program and reporting. City personnel need to maintain their commitment to the preventive maintenance system, while working toward reducing the City's present backlog of rehabilitation projects.
In order to ensure that report outputs are accurate and credible, it is essential that the integrity of all data files be maintained. This will require performing all necessary updates when changes are made to scheduling scenarios, unit cost information, historical data, etc. In addition, the entire pavement network will have to be re-inventoried at regular intervals. This typically includes surveying arterial and collectors every two years and locals every three.
This will not only allow work to be scheduled based on the most current condition data available, but will provide City personnel with a means to monitor actual rates of pavement deterioration so appropriate modifications can be made to the system curves. To be compliant with the METRO requirements, the City must generate a triennial Pavement Management report indicating condition ratings, inspection dates and forecasted maintenance/rehabilitation recommendations.
Bucknam will be supporting the City with staff level support to assist in the continuous updates with the StreetSaver/MyRoads® system. This will include work history updates, generating reports from the system, unit cost updates, and future inspections.
City of West Covina Page 10
2023 Pavement Management Program
Final Report – August 21, 2023 Section II
CONDITION DISTRIBUTION REPORT
This report depicts the distribution of the pavement condition throughout the street network by area.
The condition scheme ranges from “Very Good” to “Very Poor”; with a “Very Good” condition corresponding to a pavement at the beginning of its life cycle, and a “Very Poor” condition representing a badly deteriorated pavement with virtually no remaining life.
The table below shows the general description for each pavement condition:
Condition Description – PCI Range - Description
2023 City of West Covina weighted average PCI is 71.3 (Fair).
City of West Covina Page 11
2023 Pavement Management Program
Final Report – August 21, 2023 Section II
CALCULATION OF PCI
In order to calculate a Pavement Condition Index (PCI) value within StreetSaver, specific street section data needs to be inputted into StreetSaver to define the survey limits, asphalt types, pavement age and metrics. Pavement “sections” are pavement segments within the defined branch that have consistent pavement street classifications, construction/maintenance histories and use. Representative inspection samples are then selected and visually surveyed to locate distress data. This data is used to calculate the pavement sections Pavement Condition Index (PCI) which includes distress type, extent of the distress and its severity.
The PCI is a condition rating that ranges from 100 (pavement section that is in perfect condition) to 0 for a section that has structurally failed and deteriorated dramatically. The PCI is calculated from three major data entries from our inspectors:
1. Distress Type (one of 20 AC or 19 PCC types); these include alligator cracking, bleeding, block cracking, corrugations, depressions, long/trans cracking, patch/utility cut, potholes, rutting, weathering, raveling, etc.
2. Distress Quantity (the square footage, length or count of a specific distress)
3. Distress Severity (the level of severity determined for each distress found; low, medium or high)
Figure 8 – PCI Calculation Worksheet
City of West Covina Page 12
2023 Pavement Management Program
Final Report – August 21, 2023 Section II
West Covina MyRoads® Web-Portal –
Bucknam’s MyRoads® is a great match for
the West Covina’s PMP today and the
future. MyRoads® brings your PMP data
to life within a dynamic dashboard!
Bucknam now provides all our PMP clients
with a unique and agency driven
“MyRoads®” web-portal that provides
instantaneous access to your pavement
management database.
This “dashboard” allows users to toggle
through individual sections via GIS
mapping selections, zone queries, rank
selection, PCI ranges, etc. to review all
section metrics, latest/previous inspections, work histories generate filtered PCI reports and identify potential maintenance / rehabilitation costs based upon your unique needs.
Bucknam has shown above the current West Covina MyRoads® account actively working! This tool will be accessed
by City staff simply through a Username/Password methodology. As changes are made to the West Covina PMP database the MyRoads® dataset is changed to reflect work history edits, PCI inspections and section changes.
In summary, MyRoads® allows the user perform the following dynamic functions:
• Query specific pavement segment(s) to view current/historic PCI, work history inspection; • Filter for pavement sections within a defined zone, PCI range and/or functional class; • Select a pavement section or grouping of section through the on-board GIS tool; • Enter slurry, overlay & reconstruction unit costs to determine preliminary cost of maintenance and resulting citywide PCI
o Display critical street / sidewalk / ROW assets along pavement section(s) that are critical to Engineering Bid development and solicitation (ADA ramps, utilities, manholes, trees, etc.
• Displays all final GIS project maps (PCI, work history, 5-yr forecasted maintenance, etc.) • Bucknam will train West Covina’s staff on the simply use of the MyRoads® dashboard.
Figure 9
City of West Covina Page 13
2023 Pavement Management Program
Final Report – August 21, 2023 Section II
Figure 10 – Arterial/Collector Condition Distribution
Figure 11 – Local Condition Distribution
City of West Covina Page 14
2023 Pavement Management Program
Final Report – August 21, 2023 Section II
SAMPLE DISTRESS PHOTOS – RECOMMENDED TREATMENT (FIGURE 12) Bucknam Infrastructure Group
1. Alligator Cracking
Cracks that form a chicken wire or
alligator scale like pattern.
Low Severity: Thin parallel
longitudinal cracks that may come
together at certain points, but full
alligator pattern is not present yet.
Medium Severity: Further
development of cracks into alligator
pattern. Cracks are starting to spall.
High Severity: Alligator pattern is
heavily developed, and cracks are
spalled to the point where individual
pieces may become separated.
Typical Recommendation: Low severity, R&R – Patching, crack sealing; high severity R&R-overlay
2. Bleeding
Bleeding occurs when incorrectly
mixed asphalt is applied and in hot
weather the asphalt or tar rises to the
surface.
Severity is determined by the amount
of asphalt/tar present.
Typical Recommendation: Low
severity, apply coarse sand; high
severity, grind or heat planer excess,
resurfacing may be necessary
City of West Covina Page 15
2023 Pavement Management Program
Final Report – August 21, 2023 Section II
3. Block Cracking
Longitudinal and transverse cracks
that intersect to form smaller than
10x10 ft blocks. Creates uniform
blocks with straight edges.
Low Severity: Cracking is less than
3/8 inches.
Medium Severity: Cracking
between 3/8 and 3 inches.
High Severity: Cracking is over 3
inches.
Typical Recommendation: Low
severity, crack sealing; high severity, R&R-overlay
4. Bumps and Sags
Small, localized, and linear upward
or downward displacements of
pavement, which can be caused by
a variety of factors.
Severity is determined by the
extent to which ride quality is
diminished.
Typical Recommendation: R&R -
Patching
City of West Covina Page 16
2023 Pavement Management Program
Final Report – August 21, 2023 Section II
5. Corrugation
Closely spaced Bumps and or Sags that
form a washboard effect in the
pavement.
Severity is determined by the extent to
which ride quality is diminished.
Typical Recommendation: Low severity,
R&R – Patching; high severity, R&Roverlay
6. Depression
Localized area of pavement with a lower
elevation than the surrounding
pavement.
Low Severity: depth of ½ to 1 inch.
Medium Severity: depth of 1 to 2
Inches.
High Severity: depth greater than 2
inches.
Typical Recommendation: R&R - Patching
City of West Covina Page 17
2023 Pavement Management Program
Final Report – August 21, 2023 Section II
7. Edge Cracking
Cracks that are parallel to the
edge of the pavement that may
cause a break up of pavement.
Low Severity: Low or Medium
cracking with no breakup.
Medium Severity: Medium
cracking with some breakup.
High Severity: Considerable
breakup of pavement.
Typical Recommendation: R&R -
Patching
8. Joint Reflective Cracking
Cracking that is reflected through
AC pavement when it is overlaid
on top of PCC pavement.
Low Severity: Cracking is less than
3/8 inches.
Medium Severity: Cracking
between 3/8 and 3 inches.
High Severity: Cracking is over 3
inches.
Typical Recommendation: R&R -
Overlay
City of West Covina Page 18
2023 Pavement Management Program
Final Report – August 21, 2023 Section II
9. Lane / Shoulder Drop-off
Elevation change between
pavement and shoulder.
Low Severity: Difference in
elevation is between 1 and 2
inches.
Medium Severity: Difference in
elevation is between 2 and 4
inches.
High Severity: Difference in
elevation is over 4 inches.
Typical Recommendation: R&R –
Patching or edge grinding
10. Linear & Transverse Cracking
Cracks that are generally either parallel or
perpendicular to traffic.
Low Severity: Cracking is less than 3/8 inches.
Medium Severity: Cracking is between 3/8 and 3
inches.
High Severity: Cracking is over 3 inches.
Typical Recommendation: Low severity, crack
sealing; high severity, R&R - Overlay
City of West Covina Page 19
2023 Pavement Management Program
Final Report – August 21, 2023 Section II
11. Patching
Area of pavement that has been
replaced.
Severity is determined by the
quality of the patch and the
extent to which ride quality is
diminished.
Typical Recommendation: R&R –
structural / non-structural overlay
12. Polished Aggregate
Distress where traffic smooths
the pavement surface so friction
is diminished and cars can slide.
There are no Severity Levels for
this distress.
City of West Covina Page 20
2023 Pavement Management Program
Final Report – August 21, 2023 Section II
13. Pothole
Severity Measured using the following Matrix.
Typical Recommendation: low severity Pothole fill or R&R – Patching, high severity should be R&ROverlay City of West Covina Page 21
2023 Pavement Management Program
Final Report – August 21, 2023 Section II
14. RR Crossing
Pavement distresses caused by
railroad crossings.
Severity is determined by the extent to
which ride quality is diminished.
Typical Recommendation: R&R -
Patching
15. Rutting
Linear depressions along wheel
paths caused by traffic.
Low Severity: Depth is ¼ to ½
inches.
Medium Severity: Depth is ½ to
1 inch.
High Severity: is greater than 1
inch.
Typical Recommendation:
Pavement with deeper ruts
should be leveled and overlaid
City of West Covina Page 22
2023 Pavement Management Program
Final Report – August 21, 2023 Section II
16. Shoving
Displacement of pavement
creating a “wave” over a more
solid surface.
Severity is determined by the
extent to which ride quality is
diminished.
Typical Recommendation: R&R -
Patching
17. Slippage Cracking
Half-moon shaped cracks
where wheels cause pavement
to slide.
Low Severity: Average crack
width is less than 3/8 inch.
Medium Severity: Crack width
is between 3/8 and 3/2 inches.
High Severity: Crack width is
greater than 3/2 inches.
Typical Recommendation: R&R
- Patching
City of West Covina Page 23
2023 Pavement Management Program
Final Report – August 21, 2023 Section II
18. Swell
Upward Bulges creating “wave-like”
patterns.
Severity is determined by the extent to
which ride quality is diminished.
Typical Recommendation: Low severity,
R&R – Patching; high severity, R&Roverlay
19. Weathering
The wearing away of the asphalt binder.
Low Severity: Aggregate is starting to be
exposed.
Medium Severity: Aggregate is exposed
up to ¼ of its width.
High Severity: Aggregate is exposed to
greater than ¼ of its width.
Typical Recommendation: naturally
occurring, slurry seal
20. Raveling
The further weathering of asphalt so that
coarse aggregate is separating out of
pavement.
Medium Severity: Considerable loss of
aggregate.
High Severity: Almost complete removal
of coarse aggregate.
Typical Recommendation: Low severity,
R&R – Patching; high severity, R&Roverlay
City of West Covina Page 24
2023 Pavement Management Program
Final Report – August 21, 2023 Section II
PORTLAND CEMENT CONCRETE (PCC)
1. Blowup
Buckling at cracks or joints where
there is not enough room for slab
expansion.
Severity is determined by the
extent to which ride quality is
diminished.
2. Corner Break
Crack close to corner of slab that
creates a corner piece.
Low Severity: Crack is less than ½
inches wide.
Medium Severity: Crack is
between ½ and 2 inches wide.
High Severity: Crack is wider than
2 inches.
City of West Covina Page 25
2023 Pavement Management Program
Final Report – August 21, 2023 Section II
3. Divided Slab
Slab that is broken up into four or
more pieces by cracks.
Severity is determined by the
following matrix.
4. Durability Cracking
Pattern of cracks parallel to joints
caused by freeze-thaw expansion of
large aggregate.
Low Severity: Durability cracking
covers less than 15 percent of slab.
Medium Severity: Durability cracking
covers more than 15 percent of the
slab.
High Severity: Durability cracking
covers more than 15 percent of slab
and most pieces have come out.
City of West Covina Page 26
2023 Pavement Management Program
Final Report – August 21, 2023 Section II
5. Faulting
Elevation Difference between
slabs.
Low Severity: Elevation difference
is between 1/8 and 3/8 inch.
Medium Severity: Elevation is
between 3/8 and ¾ inch.
High Severity: Elevation is greater
than ¾ inch.
6. Joint Seal Damage
Damage to sealant between joints
that allows soil, rock, or water
infiltration.
Low Severity: Joint sealant has only
minor damage.
Medium Severity: Joint sealant is in
fair condition. Water can infiltrate
and vegetation may be present.
High Severity: Joint sealant is in
poor condition. It may be missing
and rocks may be present.
City of West Covina Page 27
2023 Pavement Management Program
Final Report – August 21, 2023 Section II
7. Lane / Shoulder Drop-Off
The Elevation difference between
pavement and shoulder.
Low Severity: Elevation difference is
between 1 and 2 inches.
Medium Severity: Elevation
difference is between 2 and 4
inches.
High Severity: Elevation difference
is greater than 4 inches.
8. Linear Cracking
Cracks that divide slab into two or
three pieces.
Low Severity: Crack is less than ½
inch wide.
Medium Severity: Crack is between
½ and 2 inches wide.
High Severity: Crack is wider than 2
inches.
City of West Covina Page 28
2023 Pavement Management Program
Final Report – August 21, 2023 Section II
9. Large Patch
Patch that is larger than 5.5 sq ft.
Low Severity: Patch has little or no
deterioration.
Medium Severity: Patch is
moderately deteriorated.
High Severity: Patch is badly
deteriorated.
10. Small Patch
Patch that is smaller than 5.5 sq ft.
Low Severity: Patch has little or no
deterioration.
Medium Severity: Patch is
moderately deteriorated.
High Severity: Patch is badly
deteriorated.
City of West Covina Page 29
2023 Pavement Management Program
Final Report – August 21, 2023 Section II
11. Polished Aggregate
Distress where traffic smooths the
pavement surface so friction is
diminished and cars can slide.
There are no Severity Levels for this
distress.
12. Popouts
Small piece of pavement that breaks
loose from surface.
There are no Severity Levels for this
distress, however popouts must
cover 3 per sq. meter of the slab.
City of West Covina Page 30
2023 Pavement Management Program
Final Report – August 21, 2023 Section II
13. Pumping
Ejection of material from slab
foundation through joints or cracks
along with water.
There are no Severity Levels for this
distress.
14. Punchout
Localized area of a slab that is broken
into many pieces.
Severity is determined by the
following matrix.
City of West Covina Page 1
2023 Pavement Management Program
Final Report – August 21, 2023 Section III
SECTION III
CITYWIDE
PAVEMENT CONDITION INDEX REPORT
A. 2023 West Covina PCI Map
B. Name Order (A to Z)
C. PCI Order (0-100)
City of West Covina Page 2
2023 Pavement Management Program
Final Report – August 21, 2023 Section III
PAVEMENT CONDITION INDEX REPORT
Listed alphabetically by street name or PCI, these reports provide the City with a listing of pertinent inventory and pavement condition data for each inventory unit within the City's pavement network. The Pavement Condition Index (PCI) Report notes the names, limits, classification, dimension, surface type, and lane configuration of each inventory unit. Detailed descriptions of the information appearing on this report are presented below:
BRANCH NAME - The name of each inventory unit appears in this column. Generally, the inventory unit name is taken directly from a street sign; however, where no street signs are posted, the name appearing on the network map is noted instead.
A sample set of street name suffix abbreviation definitions is presented below:
AVE - Avenue CT - Court CIR - Circle
DR - Drive LN - Lane RD - Road
ST - Street WY - Way EB - East Bound
NB - North Bound SB - South Bound WB - West Bound
TER - Terrace PL - Place
FROM - A description of the beginning limit of each inventory unit appears in this column. If the beginning limit exists between intersections, then the beginning limit description may be an address, post mile marker, or a distance from a known point of reference (e.g., "500' N/MAIN ST").
TO - A description of the ending limit of each inventory unit appears in this column. Like BEGIN limit, the END limit description may consist of a street name, an address, or a distance from a known point of reference. In the case of cul-de-sacs, or dead-ends, the END limit consists of and address, or a directional reference, such as "NORTH END," when no address is available.
STREET CLASSIFICATION - The codes for four street classifications are represented below. Basically, units are classified according the LA County MPAH and City classifications.
CODE DESCRIPTION
A Arterial
C Collector
R Residential / Local
O Alley
SURFACE TYPE - A code was assigned to each inventory unit to describe surface type.
CODE DESCRIPTION
AC Asphalt Concrete
AAC Asphalt Overlay over original AC construction
PCC Concrete
City of West Covina Page 3
2023 Pavement Management Program
Final Report – August 21, 2023 Section III
LENGTH - The length of the section within each branch.
UNITS - The unit of measurement for the section length, typically linear feet (LF).
AREA - The area of each section within a branch.
UNITS - The unit of measurement for the section area, typically square feet (SF).
PCI - Pavement Condition Indices were calculated for inventory units based on severity and extent of distress manifestations observed within the inventory unit. Ranging between 0 and 100, a PCI of "100" corresponds to a pavement at the beginning of its life cycle, while a PCI of "0" corresponds to a badly deteriorated pavement which is at or near the end of its life cycle.
PCI CLIMATE, LOAD AND OTHER – reflects “Section Extrapolated Distress”; these values are shown within the Sample Distresses tab within the PCI window. Distresses are aggregated based on the type and severity level. For random samples, distress quantities are adjusted to reflect the extrapolated value based on the sections total area. Extrapolated distress deducts are classified as resulting from Climate, Load and Other distresses. The Distress Classification portion of the tab shows the “percent” of extrapolated distress deduct belonging to Climate, Load and Other (these %’s are shown within the PCI reports herein). These values are beneficial in that they support the decision whether recommend slurry seal, overlay or reconstruction project for street sections.
INSPECTION DATE – Represents the most recent inspection date performed on a given sections. PCI shown is historical in value and may not indicate what “today’s” PCI is due to variance in time. Pavement deterioration calculations can be performed on a section(s) to demonstrate a deteriorated PCI based upon a new current date.
City of West Covina Page 4
2023 Pavement Management Program
Final Report – August 21, 2023 Section III
Figure 13 – 2023 West Covina Pavement Condition Index (PCI) Map City of West Covina, CA
Pavement Condition Index (PCI) Report - All Streets
Sorted by Rank, Name Order (A-Z)
Street ID Section ID Name From To Rank Zone Lanes Type L W Area PCI PCT Load PCT Climate PCT Other Insp. Date Arterials / Collectors
AmarRd 6020W AMAR RD LARK ELLEN AVE VALINDA AVE A - Arterial 0 2 O - AC/AC 2,142 34 72,828 37 74 24 3 8/3/2023 Amar 6040W AMAR RD AZUSA AVE LARK ELLEN AVE A - Arterial 0 3 O - AC/AC 1,882 34 63,988 53 64 35 1 8/3/2023 Amar 6045E AMAR RD WITZMAN DR AZUSA AVE A - Arterial 0 2 O - AC/AC 385 34 13,090 71 62 38 0 8/3/2023 AmarRd 6070E AMAR RD AZUSA AVE TEMPLE AVE A - Arterial 0 3 A - AC 1,657 36 59,652 84 0 100 0 8/3/2023 AmarRd 6080W AMAR RD TEMPLE AVE AZUSA AVE A - Arterial 0 3 A - AC 1,668 36 60,048 87 30 68 2 8/3/2023 AmarRd 6110E AMAR RD TEMPLE AVE SHADOW OAK DR A - Arterial 0 3 O - AC/AC 2,461 40 98,440 95 0 44 56 8/3/2023 AmarRd 6120W AMAR RD SHADOW OAK DR TEMPLE AVE A - Arterial 0 3 O - AC/AC 2,424 40 96,960 98 47 53 0 8/3/2023 AmarRd 6150E AMAR RD SHADOW OAK DR NOGALES ST A - Arterial 0 3 O - AC/AC 2,258 40 90,320 88 89 6 5 8/3/2023 AmarRd 6160W AMAR RD NOGALES ST SHADOW OAK DR A - Arterial 0 3 O - AC/AC 2,234 38 89,138 96 0 71 29 8/3/2023 AmarRd 6190W AMAR RD CITY BOUNDARY NOGALES ST A - Arterial 0 3 A - AC 2,145 40 85,800 88 14 77 9 8/3/2023 AROMA 6F8540 AROMA DR AZUSA AVE WILDWOOD C - Collector 10 4 A - AC 2,870 58 166,460 81 58 42 0 7/27/2023 Azusa 1000N AZUSA AVE CITY BOUNDARY AMAR RD A - Arterial 0 2 A - AC 1,990 24 47,760 62 48 46 6 8/3/2023 Azusa 1020N AZUSA AVE AMAR RD GIAMBI LN A - Arterial 0 3 A - AC 1,391 36 50,076 67 41 55 4 8/8/2023 Azusa 1030S AZUSA AVE GIAMBI LN AMAR RD A - Arterial 0 3 A - AC 1,400 36 50,400 68 40 59 1 8/8/2023 AzusaAve 1040N AZUSA AVE GIAMBI LN FAIRGROVE AVE A - Arterial 0 3 O - AC/AC 3,058 36 110,088 76 42 57 1 8/8/2023 AzusaAve 1050S AZUSA AVE FAIRGROVE AVE GIAMBI LN A - Arterial 0 3 O - AC/AC 2,990 36 108,648 86 30 46 25 8/8/2023 Azusa 1060N AZUSA AVE FAIRGROVE AVE AROMA DR A - Arterial 0 3 O - AC/AC 1,836 36 66,096 73 38 62 0 8/8/2023 Azusa 1070S AZUSA AVE AROMA DR FAIRGROVE AVE A - Arterial 0 3 O - AC/AC 1,808 36 65,088 74 29 71 0 8/8/2023 Azusa 1080N AZUSA AVE AROMA DR FRANCISQUITO AVE A - Arterial 0 3 O - AC/AC 1,050 36 37,800 71 19 56 25 8/8/2023 Azusa 1090S AZUSA AVE FRANCISQUITO AVE AROMA DR A - Arterial 0 3 O - AC/AC 1,033 36 37,188 72 30 70 0 8/8/2023 Azusa 1100N AZUSA AVE FRANCISQUITO AVE MERCED AVE A - Arterial 0 2 O - AC/AC 1,275 30 38,250 71 23 61 17 8/8/2023 Azusa 1110S AZUSA AVE MERCED AVE FRANCISQUITO AVE A - Arterial 0 2 O - AC/AC 1,204 30 36,120 76 32 68 0 8/8/2023 Azusa 1120N AZUSA AVE MERCED AVE VINE AVE A - Arterial 0 2 O - AC/AC 1,204 30 36,120 70 50 39 11 8/8/2023 Azusa 1130S AZUSA AVE VINE AVE MERCED AVE A - Arterial 0 2 O - AC/AC 1,191 30 35,730 78 29 71 0 8/8/2023 Azusa 1140N AZUSA AVE VINE AVE CAMERON AVE A - Arterial 0 2 O - AC/AC 1,190 30 35,700 56 46 51 3 8/8/2023 Azusa 1150S AZUSA AVE CAMERON AVE VINE AVE A - Arterial 0 2 O - AC/AC 1,211 30 36,330 49 58 41 2 8/8/2023 Azusa 1160N AZUSA AVE CAMERON AVE MOBECK ST A - Arterial 0 2 O - AC/AC 596 30 17,880 51 43 51 5 8/8/2023 Azusa 1170S AZUSA AVE MOBECK ST CAMERON AVE A - Arterial 0 2 O - AC/AC 596 30 17,880 53 38 60 1 8/8/2023 AzusaAve 1180N AZUSA AVE MOBECK ST SOUTH GARVEY AVE A - Arterial 0 2 O - AC/AC 2,619 30 79,767 57 50 50 0 8/8/2023 AzusaAve 1190S AZUSA AVE SOUTH GARVEY AVE MOBECK ST A - Arterial 0 2 O - AC/AC 2,619 30 79,824 53 51 48 1 8/8/2023 Azusa 1220N AZUSA AVE NORTH GARVEY AVE SOUTH GARVEY AVE A - Arterial 0 3 O - AC/AC 1,164 44 51,216 58 56 44 0 8/11/2023 Azusa 1230S AZUSA AVE SOUTH GARVEY AVE NORTH GARVEY AVE A - Arterial 0 3 O - AC/AC 1,164 43 50,052 50 53 39 8 8/11/2023 AzusaAve 1280N AZUSA AVE NORTH GARVEY AVE WORKMAN AVE A - Arterial 0 2 O - AC/AC 588 32 19,222 27 65 31 5 7/28/2023 AzusaAve 1290S AZUSA AVE WORKMAN AVE NORTH GARVEY AVE A - Arterial 0 3 O - AC/AC 588 32 19,222 27 74 26 0 8/11/2023 Azusa 1294N AZUSA AVE WORKMAN AVE ROWLAND AVE A - Arterial 0 2 O - AC/AC 1,251 32 40,032 21 70 24 6 7/28/2023 Azusa 1294S AZUSA AVE ROWLAND AVE WORKMAN AVE A - Arterial 0 2 O - AC/AC 1,251 32 40,032 29 77 20 3 8/3/2023 Azusa 1296N AZUSA AVE ROWLAND AVE PUENTE AVE A - Arterial 0 2 O - AC/AC 1,254 32 40,128 32 72 24 4 7/28/2023 Azusa 1296S AZUSA AVE PUENTE AVE ROWLAND AVE A - Arterial 0 2 O - AC/AC 1,254 32 40,128 31 78 22 1 8/3/2023 Azusa 1298N AZUSA AVE PUENTE AVE NORTH CITY LIMIT A - Arterial 0 2 O - AC/AC 649 32 20,768 37 54 33 14 7/28/2023 Azusa 1298S AZUSA AVE NORTH CITY LIMIT PUENTE AVE A - Arterial 0 2 O - AC/AC 649 31 20,119 42 59 41 0 8/11/2023 Azusac 8670N AZUSA CANYON RD SAN BERNARDINO RD CITY BOUNDARY A - Arterial 0 1 O - AC/AC 794 22 17,468 55 66 34 0 8/11/2023 Azusac 8680S AZUSA CANYON RD CITY BOUNDARY SAN BERNARDINO RD A - Arterial 0 1 O - AC/AC 796 22 17,512 50 53 28 19 8/11/2023 Badill 5120E BADILLO ST CITY BOUNDARY ORANGE AVE A - Arterial 1 2 A - AC 988 30 29,640 77 37 61 2 7/3/2023 Badill 5130W BADILLO ST ORANGE AVE CITY BOUNDARY A - Arterial 1 2 A - AC 989 30 29,670 76 58 42 0 7/3/2023 Badill 5140E BADILLO ST CITY BOUNDARY IRWINDALE AVE A - Arterial 0 2 O - AC/AC 566 30 16,980 72 48 42 9 8/11/2023 Badill 5150W BADILLO ST IRWINDALE AVE CITY BOUNDARY A - Arterial 0 2 O - AC/AC 569 30 17,070 71 43 57 0 8/11/2023 Badill 5180W BADILLO ST VINCENT AVE CITY BOUNDARY A - Arterial 0 2 A - AC 473 32 12,288 34 40 34 26 7/28/2023 Badill 5200E BADILLO ST VINCENT AVE END OF PCC A - Arterial 0 2 P - PCC 100 44 4,400 89 13 52 35 8/15/2023 Badill 5210W BADILLO ST VINCENT AVE END OF PCC A - Arterial 0 2 P - PCC 100 44 4,400 84 0 60 40 7/28/2023 Badill 5220E BADILLO ST VINCENT AVE LARK ELLEN AVE A - Arterial 0 2 O - AC/AC 2,594 32 83,008 83 14 66 21 7/28/2023 Badill 5230W BADILLO ST LARK ELLEN AVE VINCENT AVE A - Arterial 0 2 O - AC/AC 2,605 32 83,360 77 17 68 15 7/28/2023 Badill 5400E BADILLO ST LARK ELLEN AVE (BEGIN OF PCC) END OF PCC A - Arterial 0 2 P - PCC 250 40 10,000 80 22 39 40 8/15/2023 Badill 5410W BADILLO ST LARK ELLEN AVE (BEGIN OF PCC) END OF PCC A - Arterial 0 2 P - PCC 250 40 10,000 84 0 38 62 8/15/2023 Barran 8390N BARRANCA ST CAMERON AVE CORTEZ ST A - Arterial 0 2 O - AC/AC 1,033 30 30,990 51 74 26 0 8/2/2023 Barran 8400S BARRANCA ST CORTEZ ST CAMERON AVE A - Arterial 0 2 O - AC/AC 1,025 30 30,750 48 77 23 0 8/2/2023 Barran 8410N BARRANCA ST CORTEZ ST VIRGINIA AVE A - Arterial 9 2 O - AC/AC 1,981 30 59,430 73 35 32 33 8/2/2023 Barran 8420S BARRANCA ST VIRGINIA AVE CORTEZ ST A - Arterial 9 2 O - AC/AC 1,983 30 59,490 50 81 12 7 8/2/2023 Barranca 8430N BARRANCA ST VIRGINIA AVE SOUTH GARVEY AVE A - Arterial 0 2 O - AC/AC 653 30 21,615 73 11 89 0 8/2/2023 Barranca 8440S BARRANCA ST SOUTH GARVEY AVE VIRGINIA AVE A - Arterial 0 2 O - AC/AC 639 30 20,655 55 62 38 0 8/2/2023 Barran 8470N BARRANCA ST SOUTH GARVEY AVE NORTH GARVEY AVE A - Arterial 3 3 A - AC 419 45 18,855 46 45 55 0 8/10/2023 Barran 8480S BARRANCA ST NORTH GARVEY AVE SOUTH GARVEY AVE A - Arterial 3 2 A - AC 461 45 20,745 43 48 52 0 8/10/2023 Barran 8490N BARRANCA ST NORTH GARVEY AVE CITY BOUNDARY A - Arterial 0 3 A - AC 318 31 9,858 32 35 65 0 8/10/2023 Barranca 8500S BARRANCA ST CITY BOUNDARY NORTH GARVEY AVE A - Arterial 0 2 A - AC 832 16 13,312 50 49 51 0 8/10/2023 Califo 3810N CALIFORNIA AVE FRANCISQUITO AVE MERCED AVE C - Collector 5 1 O - AC/AC 3,628 18 65,304 99 0 72 28 8/4/2023 Califo 3820S CALIFORNIA AVE MERCED AVE FRANCISQUITO AVE C - Collector 5 1 O - AC/AC 3,638 18 65,484 98 0 27 73 8/4/2023 Califo 3850N CALIFORNIA AVE MERCED AVE CAMERON AVE C - Collector 5 1 O - AC/AC 2,891 18 52,038 99 0 45 55 8/4/2023 Califo 3860S CALIFORNIA AVE CAMERON AVE MERCED AVE C - Collector 5 1 O - AC/AC 2,911 18 52,398 99 0 14 86 8/4/2023 CalifoAve 3870N CALIFORNIA AVE CAMERON AVE SERVICE AVE C - Collector 5 2 O - AC/AC 653 36 23,508 99 0 100 0 8/4/2023 CalifoAve 3890N CALIFORNIA AVE SERVICE AVE WEST COVINA PKWY C - Collector 5 2 O - AC/AC 1,390 38 52,820 98 0 100 0 8/4/2023 Camero 7640S CAMERON AVE PACIFIC AVE ORANGE AVE A - Arterial 4 2 O - AC/AC 1,667 25 41,675 38 58 42 0 8/14/2023 Camero 7650N CAMERON AVE ORANGE AVE PACIFIC AVE A - Arterial 4 2 O - AC/AC 1,505 25 37,625 48 54 32 14 8/14/2023 Cameron 7680E CAMERON AVE ORANGE AVE TOLUCA AVE A - Arterial 0 2 A - AC 1,031 25 30,250 64 6 83 11 8/14/2023 Cameron 7690W CAMERON AVE TOLUCA AVE ORANGE AVE A - Arterial 0 2 A - AC 1,023 25 30,065 63 26 44 30 8/14/2023 Camero 7700E CAMERON AVE TOLUCA AVE SUNSET AVE A - Arterial 0 2 O - AC/AC 895 30 26,850 62 38 62 0 8/14/2023
City of West Covina, CA
Pavement Condition Index (PCI) Report - All Streets
Sorted by Rank, Name Order (A-Z)
Camero 7710W CAMERON AVE SUNSET AVE TOLUCA AVE A - Arterial 0 2 O - AC/AC 889 30 26,670 76 25 65 10 8/14/2023 Camero 7740E CAMERON AVE SUNSET AVE EVANWOOD AVE A - Arterial 0 2 O - AC/AC 1,028 28 28,784 65 56 44 0 8/14/2023 Camero 7750W CAMERON AVE EVANWOOD AVE SUNSET AVE A - Arterial 0 2 O - AC/AC 1,026 28 28,728 57 65 35 0 8/14/2023 Cameron 7760E CAMERON AVE EVANWOOD AVE CALIFORNIA AVE A - Arterial 0 2 O - AC/AC 924 28 26,332 40 87 13 0 8/14/2023 Camero 7770W CAMERON AVE CALIFORNIA AVE EVANWOOD AVE A - Arterial 0 2 O - AC/AC 916 28 26,076 37 77 23 0 8/14/2023 Camero 7800E CAMERON AVE CALIFORNIA AVE GLENDORA AVE A - Arterial 0 2 O - AC/AC 1,160 32 37,120 68 40 60 0 8/14/2023 Camero 7810W CAMERON AVE GLENDORA AVE CALIFORNIA AVE A - Arterial 0 2 O - AC/AC 1,165 32 37,280 66 42 51 7 8/14/2023 Camero 7820E CAMERON AVE GLENDORA AVE END OF PCC A - Arterial 0 2 P - PCC 143 32 4,576 90 0 71 29 8/14/2023 Camero 7830W CAMERON AVE GLENDORA AVE END OF PCC A - Arterial 0 2 P - PCC 157 32 5,024 87 0 91 9 8/8/2023 Cameron 7840E CAMERON AVE GLENDORA AVE VALINDA AVE A - Arterial 0 2 O - AC/AC 1,970 31 61,192 73 32 68 0 8/8/2023 Cameron 7850W CAMERON AVE VALINDA AVE GLENDORA AVE A - Arterial 0 2 O - AC/AC 1,902 31 59,085 54 54 46 0 8/8/2023 Camero 7880E CAMERON AVE VALINDA AVE GRETTA AVE A - Arterial 0 2 O - AC/AC 1,100 29 31,900 48 62 38 0 8/8/2023 Camero 7890W CAMERON AVE GRETTA AVE VALINDA AVE A - Arterial 0 2 O - AC/AC 1,110 29 32,190 46 49 47 4 8/11/2023 Cameron 7900E CAMERON AVE GRETTA AVE LARK ELLEN AVE A - Arterial 0 2 O - AC/AC 1,549 29 44,921 60 63 25 12 8/8/2023 Cameron 7910W CAMERON AVE LARK ELLEN AVE GRETTA AVE A - Arterial 0 2 O - AC/AC 1,549 29 44,921 44 58 42 0 8/11/2023 Camero 7940E CAMERON AVE LARK ELLEN AVE AZUSA AVE A - Arterial 0 2 O - AC/AC 2,584 29 74,936 38 67 33 1 8/8/2023 Camero 7950W CAMERON AVE AZUSA AVE LARK ELLEN AVE A - Arterial 0 2 O - AC/AC 2,589 29 75,081 40 65 32 3 8/11/2023 Camero 7960E CAMERON AVE AZUSA AVE HOLLENBECK ST A - Arterial 0 2 O - AC/AC 2,573 29 74,617 96 0 100 0 8/8/2023 Camero 7970W CAMERON AVE HOLLENBECK ST AZUSA AVE A - Arterial 0 2 O - AC/AC 2,564 29 74,356 93 12 88 0 8/11/2023 Cameron 7980E CAMERON AVE HOLLENBECK ST CITRUS ST A - Arterial 8 2 O - AC/AC 2,681 28 76,916 94 0 100 0 8/8/2023 Cameron 7990W CAMERON AVE CITRUS ST HOLLENBECK ST A - Arterial 8 2 O - AC/AC 2,679 28 76,842 91 0 100 0 8/11/2023 Cameron 8000E CAMERON AVE CITRUS ST BARRANCA ST A - Arterial 0 2 O - AC/AC 2,630 29 76,152 92 0 100 0 8/8/2023 Cameron 8010W CAMERON AVE BARRANCA ST CITRUS ST A - Arterial 0 2 O - AC/AC 2,617 29 77,342 91 0 100 0 8/2/2023 Camero 8020E CAMERON AVE BARRANCA ST CITY BOUNDARY A - Arterial 0 2 O - AC/AC 3,157 29 91,553 46 59 41 0 8/8/2023 Camero 8030W CAMERON AVE CITY BOUNDARY BARRANCA ST A - Arterial 0 2 O - AC/AC 3,281 29 95,149 44 44 47 8 8/11/2023 Camero 8045E CAMERON AVE CITY BOUNDARY AT QUAIL VALLEY E CITY LIMIT AT GRAND AVE A - Arterial 0 2 O - AC/AC 800 31 24,800 38 60 40 0 8/11/2023 Camero 8055W CAMERON AVE CITY BOUNDARY AT QUAIL VALLEY E CITY LIMIT AT GRAND AVE A - Arterial 0 2 O - AC/AC 720 31 22,320 39 58 42 0 8/11/2023 CitrusSt 3480N CITRUS ST MONTEZUMA WY LARK HILL DR C - Collector 10 1 O - AC/AC 2,432 36 87,552 96 0 100 0 8/8/2023 Citrus 3520N CITRUS ST LARK HILL DR VINE AVE C - Collector 10 2 O - AC/AC 584 28 16,352 90 23 77 0 8/8/2023 Citrus 3540N CITRUS ST VINE AVE CAMERON AVE A - Arterial 0 2 O - AC/AC 1,265 28 35,420 74 3 95 2 8/8/2023 Citrus 3550S CITRUS ST CAMERON AVE VINE AVE A - Arterial 0 2 O - AC/AC 1,245 28 34,860 77 0 100 0 8/8/2023 Citrus 3560N CITRUS ST CAMERON AVE CORTEZ ST A - Arterial 0 2 O - AC/AC 1,201 28 33,628 39 73 27 0 8/9/2023 Citrus 3570S CITRUS ST CORTEZ ST CAMERON AVE A - Arterial 0 2 O - AC/AC 1,201 28 33,628 46 65 35 0 8/9/2023 Citrus 3580N CITRUS ST CORTEZ ST SOUTH GARVEY AVE A - Arterial 0 2 O - AC/AC 1,994 29 57,826 61 56 44 0 8/9/2023 Citrus 3590S CITRUS ST SOUTH GARVEY AVE CORTEZ ST A - Arterial 0 2 O - AC/AC 2,025 29 58,725 66 23 61 16 8/9/2023 Citrus 3620N CITRUS ST EASTLAND CENTER DR WORKMAN AVE A - Arterial 0 3 A - AC 625 36 22,500 36 55 31 14 7/28/2023 Citrus 3630S CITRUS ST WORKMAN AVE EASTLAND CENTER DR A - Arterial 0 3 A - AC 624 36 22,464 71 64 36 0 7/28/2023 Citrus 3641S CITRUS ST CITY BOUNDARY WORKMAN AVE A - Arterial 3 2 A - AC 684 36 24,624 98 0 100 0 7/28/2023 CortezSt 6320 CORTEZ ST AZUSA AVE HOLLENBECK ST C - Collector 8 2 A - AC 2,571 44 113,124 70 32 68 0 8/2/2023 CortezSt 6360E CORTEZ ST HOLLENBECK ST CITRUS ST C - Collector 8 2 A - AC 2,556 44 112,464 58 52 48 0 8/2/2023 CortezSt 6400E CORTEZ ST CITRUS ST 737' E/O CITRUS ST C - Collector 9 2 O - AC/AC 737 44 32,428 59 59 35 6 8/2/2023 CortezSt 6412E CORTEZ ST 737'' E/O CITRUS ST BARRANCA ST C - Collector 9 2 A - AC 1,894 44 83,336 80 19 52 29 8/2/2023 CortezSt 6440E CORTEZ ST BARRANCA ST WREDE WY C - Collector 9 2 A - AC 3,981 44 175,164 82 0 73 27 8/2/2023 CortezSt 6460E CORTEZ ST WREDE WY CITY BOUNDARY C - Collector 9 2 A - AC 446 44 8,028 52 46 33 21 8/2/2023 Fairgr 8570 FAIRGROVE AVE NELSON ST AZUSA AVE C - Collector 7 1 O - AC/AC 748 20 14,960 87 62 38 0 8/2/2023 Fairgr 8570 FAIRGROVE AVE AZUSA AVE NELSON ST C - Collector 7 1 O - AC/AC 810 20 16,200 91 32 68 0 8/8/2023 Fairgr 8520E FAIRGROVE AVE LARK ELLEN AVE MOLOKAI C - Collector 7 1 O - AC/AC 1,060 20 21,200 65 73 17 10 8/2/2023 Fairgr 8530W FAIRGROVE AVE MOLOKAI LARK ELLEN AVE C - Collector 7 1 O - AC/AC 1,060 20 21,200 75 66 31 3 8/8/2023 Fairgr 8540E FAIRGROVE AVE MOLOKAI NELSON ST C - Collector 7 1 O - AC/AC 1,538 20 30,760 80 72 28 0 8/2/2023 Fairgr 8550W FAIRGROVE AVE NELSON ST MOLOKAI C - Collector 7 1 O - AC/AC 1,549 20 30,980 90 59 41 0 8/8/2023 Fairgr 8580W FAIRGROVE AVE NW CITY BOUNDARY SE CITY BOUNDARY C - Collector 4 1 O - AC/AC 1,850 37 68,450 72 66 34 0 8/14/2023 Fairgr 8590W FAIRGROVE AVE SUNSET AVE INTERSECTION C - Collector 5 1 A - AC 800 28 22,400 88 41 59 0 8/14/2023 Franci 5840N FRANCISQUITO AVE WILLOW AVE CITY BOUNDARY A - Arterial 0 2 O - AC/AC 1,271 21 26,691 82 28 53 19 8/11/2023 Franci 5860S FRANCISQUITO AVE CITY BOUNDARY WILLOW AVE A - Arterial 0 2 O - AC/AC 589 31 18,259 72 38 40 22 8/14/2023 FranciAve 5870N FRANCISQUITO AVE ORANGE AVE WILLOW AVE A - Arterial 0 2 O - AC/AC 2,069 26 53,110 59 77 23 0 8/14/2023 FranciAve 5900W FRANCISQUITO AVE SUNSET AVE ORANGE AVE A - Arterial 0 2 A - AC 1,944 30 58,320 47 70 30 1 8/4/2023 FranciAve 5910E FRANCISQUITO AVE ORANGE AVE SUNSET AVE A - Arterial 0 2 A - AC 1,942 23 45,709 38 85 15 0 8/14/2023 FranciAve 5921N FRANCISQUITO AVE CALIFORNIA AVE BROADMOOR AVE A - Arterial 0 2 O - AC/AC 1,007 28 28,196 38 68 29 3 8/4/2023 Franci 5922N FRANCISQUITO AVE BROADMOOR AVE SUNSET AVE A - Arterial 0 2 O - AC/AC 893 28 25,004 61 72 28 0 8/14/2023 Franci 5930S FRANCISQUITO AVE SUNSET AVE BROADMOOR AVE A - Arterial 0 2 O - AC/AC 880 28 24,640 59 75 25 0 8/14/2023 Franci 5931S FRANCISQUITO AVE BOARDMOOR AVE CALIFORNIA AVE A - Arterial 0 2 O - AC/AC 913 28 25,564 18 87 8 4 8/14/2023 Franci 5950N FRANCISQUITO AVE CITY BOUNDARY CALIFORNIA AVE A - Arterial 0 2 A - AC 414 23 9,522 41 59 27 14 8/4/2023 Franci 5960W FRANCISQUITO AVE WALNUT AVE MULLENDER AVE C - Collector 6 1 A - AC 1,180 18 21,240 67 69 31 0 8/9/2023 Franci 5970E FRANCISQUITO AVE FRANDALE AVE CRAIG DR C - Collector 6 1 O - AC/AC 543 18 9,774 75 0 100 0 8/9/2023 Franci 5980E FRANCISQUITO AVE CRAIG DR VALINDA AVE C - Collector 6 1 O - AC/AC 1,709 18 30,762 63 53 46 2 8/9/2023 Franci 5990W FRANCISQUITO AVE VALINDA AVE CITY BOUNDARY C - Collector 6 1 O - AC/AC 1,259 18 22,662 46 49 31 20 8/9/2023 Franci 6000E FRANCISQUITO AVE HYACINTH AVE AZUSA AVE C - Collector 7 1 O - AC/AC 1,950 18 35,100 62 74 26 0 7/27/2023 Franci 6010W FRANCISQUITO AVE AZUSA AVE HYACINTH AVE C - Collector 7 1 O - AC/AC 1,948 18 35,064 54 75 25 0 7/27/2023 Franci 5830N FRANCISQUITO FRONTAGE RD CUL-DE-SAC (E/ SIESTA AVE) WEST CITY BOUNDARY A - Arterial 4 2 O - AC/AC 1,252 26 32,552 79 22 73 5 6/27/2023 GarveyAve 6560 GARVEY AVE (N) PACIFIC AVE ORANGE AVE C - Collector 1 2 A - AC 270 36 9,720 85 56 28 16 8/14/2023 GarveyAve 6580 GARVEY AVE (N) ORANGE AVE SUNSET AVE C - Collector 1 2 A - AC 2,805 30 84,150 78 34 55 11 8/2/2023 GarveyAve 6600 GARVEY AVE (N) SUNSET AVE MORADA AVE C - Collector 1 2 A - AC 2,070 30 62,100 78 30 43 27 8/2/2023 GarveyAve 6620 GARVEY AVE (N) MORADA AVE VINCENT AVE C - Collector 1 2 A - AC 1,155 25 28,875 69 31 38 30 8/2/2023 GarveyAve 6640 GARVEY AVE (N) MAPLEWOOD AVE TOLAND AVE C - Collector 2 2 A - AC 1,210 32 38,720 76 11 89 0 8/7/2023 GarveyAve 6660 GARVEY AVE (N) AZUSA AVE HOLLENBECK ST C - Collector 3 2 O - AC/AC 2,907 30 87,210 79 18 57 25 7/28/2023 GarveyAve 6700 GARVEY AVE (N) HOLLENBECK ST CITRUS ST C - Collector 3 2 A - AC 2,911 30 87,330 63 40 38 22 7/28/2023 GarveyAve 6760 GARVEY AVE (N) BARRANCA ST FAIRWAY LN C - Collector 3 2 A - AC 1,343 25 33,575 80 51 45 4 8/10/2023
City of West Covina, CA
Pavement Condition Index (PCI) Report - All Streets
Sorted by Rank, Name Order (A-Z)
GarveyAve 6770 GARVEY AVE (N) FAIRWAY LN BARRANCA ST A - Arterial 3 2 A - AC 1,344 25 33,600 80 52 35 13 8/10/2023 GarveyAve 6780 GARVEY AVE (N) FAIRWAY LN CITY BOUNDARY C - Collector 3 2 A - AC 2,300 30 69,000 89 10 90 0 8/10/2023 Garvey 6540 GARVEY AVE (N) CAMERON AVE SUNKIST AVE C - Collector 1 2 A - AC 885 28 24,780 85 23 77 0 7/3/2023 Garvey 6545 GARVEY AVE (N) SUNKIST AVE WILLOW AVE C - Collector 1 2 A - AC 930 30 27,900 82 15 85 0 7/3/2023 Garvey 6550 GARVEY AVE (N) WILLOW AVE WEST CITY BOUNDARY C - Collector 1 2 A - AC 1,485 30 44,550 70 62 36 2 7/3/2023 GarveyAve 6800 GARVEY AVE (S) HOLT AVE CITY BOUNDARY C - Collector 9 2 O - AC/AC 2,388 30 71,640 82 22 47 32 8/10/2023 GarveyAve 6820 GARVEY AVE (S) CITY BOUNDARY ORANGE AVE C - Collector 4 2 O - AC/AC 3,750 30 112,500 75 34 50 16 8/4/2023 GarveyAve 6960 GARVEY AVE (S) GLENDORA AVE LARK ELLEN AVE C - Collector 6 2 A - AC 1,060 36 38,160 67 34 57 10 8/10/2023 GarveyAve 6980 GARVEY AVE (S) LARK ELLEN AVE CHERRYWOOD ST C - Collector 7 2 A - AC 1,418 30 42,540 61 34 66 0 8/7/2023 GarveyAve 7000 GARVEY AVE (S) CHERRYWOOD ST AZUSA AVE C - Collector 7 2 A - AC 1,165 36 41,940 76 37 61 2 8/7/2023 GarveyAve 7040 GARVEY AVE (S) AZUSA AVE HOLLENBECK ST C - Collector 8 2 O - AC/AC 2,960 36 106,560 62 47 47 7 8/7/2023 GarveyAve 7080 GARVEY AVE (S) HOLLENBECK ST MOCKINGBIRD LN C - Collector 8 2 O - AC/AC 1,685 30 50,550 65 34 61 5 8/7/2023 GarveyAve 7100 GARVEY AVE (S) CITRUS ST BARRANCA ST C - Collector 9 2 O - AC/AC 2,780 30 83,400 57 23 60 17 8/10/2023 GarveyAve 7150 GARVEY AVE (S) HOLT AVE BARRANCA ST C - Collector 9 2 O - AC/AC 1,230 32 39,360 49 34 64 2 8/10/2023 Garvey 6840W GARVEY AVE (S) SUNSET AVE WEST COVINA PKWY C - Collector 4 1 O - AC/AC 1,800 18 31,086 74 30 65 5 8/8/2023 Garvey 6845E GARVEY AVE (S) WEST COVINA PKWY SUNSET AVE C - Collector 4 2 O - AC/AC 1,808 38 65,968 70 14 69 17 8/8/2023 Garvey 6870E GARVEY AVE (S) INTERSECTION CALIFORNIA AVE A - Arterial 5 3 A - AC 43 35 1,505 76 0 62 38 8/8/2023 Garvey 6880W GARVEY AVE (S) INTERSECTION CALIFORNIA AVE A - Arterial 5 2 A - AC 43 22 946 73 21 79 0 8/8/2023 Glendo 1580N GLENDORA AVE CITY BOUNDARY MERCED AVE A - Arterial 0 2 A - AC 1,496 28 41,888 75 61 39 0 8/8/2023 Glendo 1590S GLENDORA AVE MERCED AVE CITY BOUNDARY A - Arterial 0 2 A - AC 1,550 28 41,900 77 61 26 13 8/8/2023 Glendo 1600N GLENDORA AVE MERCED AVE VINE AVE A - Arterial 0 2 A - AC 1,066 28 25,852 75 60 40 0 8/8/2023 Glendo 1610S GLENDORA AVE VINE AVE MERCED AVE A - Arterial 0 2 A - AC 1,033 28 28,924 77 67 33 0 8/14/2023 Glendo 1620N GLENDORA AVE VINE AVE CAMERON AVE A - Arterial 0 2 O - AC/AC 1,504 28 42,112 67 50 25 25 8/8/2023 Glendo 1630S GLENDORA AVE CAMERON AVE VINE AVE A - Arterial 0 2 O - AC/AC 1,742 28 47,496 66 54 40 6 8/14/2023 Glendo 1640N GLENDORA AVE CAMERON AVE VINCENT AVE A - Arterial 0 2 O - AC/AC 1,548 28 41,040 69 68 32 0 8/8/2023 Glendo 1650S GLENDORA AVE VINCENT AVE CAMERON AVE A - Arterial 0 2 O - AC/AC 1,396 28 36,898 69 34 52 15 8/8/2023 GlendoAve 1660N GLENDORA AVE VINCENT AVE VALINDA AVE A - Arterial 0 2 O - AC/AC 1,181 28 34,864 58 29 59 11 8/11/2023 GlendoAve 1670S GLENDORA AVE VALINDA AVE VINCENT AVE A - Arterial 0 2 O - AC/AC 1,115 40 44,600 33 57 34 8 8/11/2023 Glendo 1701N GLENDORA AVE LAKES DR. SOUTH GARVEY AVE C - Collector 6 1 A - AC 1,520 12 18,240 73 28 57 15 8/10/2023 Glendo 1702S GLENDORA AVE SOUTH GARVEY AVE LAKES DR. C - Collector 6 1 A - AC 1,583 12 18,996 67 37 46 17 8/10/2023 GLENDO 1703N1 GLENDORA AVE VALINDA AVE WALNUT CREEK PKWY A - Arterial 0 2 A - AC 340 38 12,920 49 54 46 0 8/11/2023 GLENDO 1703N2 GLENDORA AVE WALNUT CREEK PKWY LAKES DR A - Arterial 0 2 A - AC 540 28 15,120 51 72 28 0 8/11/2023 GLENDO 1704S1 GLENDORA AVE LAKES DR WALNUT CREEK PKWY A - Arterial 0 2 A - AC 540 28 15,120 94 0 100 0 8/10/2023 GLENDO 1704S2 GLENDORA AVE WALNUT CREEK PKWY VALINDA AVE A - Arterial 0 2 A - AC 340 38 12,920 57 47 49 5 8/11/2023 GrandAve 3010N GRAND AVE SOUTH CITY BOUNDARY HOLT AVE A - Arterial 0 2 O - AC/AC 382 41 16,170 61 28 72 0 8/10/2023 GrandAve 3020S GRAND AVE HOLT AVE SOUTH CITY BOUNDARY A - Arterial 0 2 O - AC/AC 485 43 21,315 67 23 77 0 8/10/2023 Grand 3050N GRAND AVE HOLT AVE SOUTH STATE BOUNDARY/FREEWAY A - Arterial 0 2 O - AC/AC 477 40 19,080 62 21 75 4 8/10/2023 Grand 3060S GRAND AVE SOUTH STATE BOUNDARY/FREEWAY HOLT AVE A - Arterial 0 2 O - AC/AC 417 36 15,012 61 35 63 2 8/10/2023 GrandAve 3090N GRAND AVE NORTH CITY / STATE BOUNDARY FAIRWAY LN A - Arterial 0 2 O - AC/AC 499 47 23,671 59 37 61 2 8/10/2023 GrandAve 3100S GRAND AVE FAIRWAY LN NORTH CITY / STATE BOUNDARY A - Arterial 0 2 O - AC/AC 511 30 17,454 51 47 53 0 8/10/2023 Citrus 3460N HILLSIDE DR HILLSIDE DR MONTEZUMA WY C - Collector 10 2 A - AC 1,895 36 68,220 86 69 31 0 8/8/2023 HollenSt 3160 HOLLENBECK ST HOLLENCREST DR MERCED AVE A - Arterial 10 2 A - AC 360 38 13,464 67 6 94 0 8/4/2023 HollenSt 3190N HOLLENBECK ST MERCED AVE VINE AVE A - Arterial 0 2 A - AC 1,304 29 37,816 58 63 37 0 8/4/2023 HollenSt 3200S HOLLENBECK ST VINE AVE MERCED AVE A - Arterial 0 2 O - AC/AC 1,304 29 37,866 78 35 65 0 8/4/2023 HollenSt 3230N HOLLENBECK ST VINE AVE CAMERON AVE A - Arterial 0 2 A - AC 1,317 19 25,023 86 0 100 0 8/4/2023 HollenSt 3240S HOLLENBECK ST CAMERON AVE VINE AVE A - Arterial 0 2 O - AC/AC 1,333 19 26,383 76 22 78 0 8/4/2023 HollenSt 3270N HOLLENBECK ST CAMERON AVE CORTEZ ST A - Arterial 0 2 O - AC/AC 1,355 29 39,295 70 22 56 22 8/4/2023 Hollen 3280S HOLLENBECK ST CORTEZ ST CAMERON AVE A - Arterial 0 2 O - AC/AC 1,272 29 36,888 67 36 64 0 8/4/2023 Hollen 3310N HOLLENBECK ST CORTEZ ST RIO VERDE DR A - Arterial 0 2 O - AC/AC 863 29 25,027 50 63 21 16 8/4/2023 HollenSt 3320S HOLLENBECK ST RIO VERDE DR CORTEZ ST A - Arterial 0 2 O - AC/AC 919 29 26,798 55 68 31 1 8/4/2023 HollenSt 3350N HOLLENBECK ST RIO VERDE DR INTERSECTION A - Arterial 0 2 O - AC/AC 1,607 29 46,603 67 41 59 0 8/4/2023 HollenSt 3360S HOLLENBECK ST SOUTH GARVEY AVE RIO VERDE DR A - Arterial 0 2 O - AC/AC 1,696 29 49,712 59 56 36 8 8/4/2023 HollenSt 3390N HOLLENBECK ST SOUTH GARVEY AVE NORTH GARVEY AVE A - Arterial 3 2 A - AC 568 29 16,472 63 31 63 6 8/10/2023 HollenSt 3400S HOLLENBECK ST NORTH GARVEY AVE SOUTH GARVEY AVE A - Arterial 3 2 O - AC/AC 562 29 17,018 67 30 67 3 8/10/2023 HollenSt 3430N HOLLENBECK ST NORTH GARVEY AVE CITY BOUNDARY A - Arterial 3 2 A - AC 435 29 12,615 73 7 88 5 8/10/2023 Hollen 3440S HOLLENBECK ST CITY BOUNDARY NORTH GARVEY AVE A - Arterial 3 2 O - AC/AC 366 29 10,614 80 0 100 0 8/10/2023 HoltAve 6470W HOLT AVE GRAND AVE SOUTH GARVEY AVE C - Collector 9 2 O - AC/AC 1,790 36 64,440 45 74 26 0 8/10/2023 HoltAve 6500E HOLT AVE GRAND AVE TEMPLE WY C - Collector 9 2 O - AC/AC 1,498 30 44,940 49 77 21 2 8/10/2023 Holt 6512E HOLT AVE TEMPLE WY CITY BOUNDARY C - Collector 9 2 O - AC/AC 928 30 27,840 73 64 36 0 8/10/2023 Holt 6513W HOLT AVE CITY BOUNDARY TEMPLE WY C - Collector 9 2 O - AC/AC 916 30 27,480 88 0 100 0 8/10/2023 HOLTAV 9ZA9031 HOLT AVE GRAND AVE (TO WEST) GARVEY AVE S C - Collector 9 2 A - AC 1,785 36 64,260 62 71 26 3 8/10/2023 LaPuen 4140W LA PUENTE RD SENTOUS AVE NOGALES ST A - Arterial 0 2 A - AC 2,112 34 71,808 67 22 78 0 8/7/2023 LaPuen 4150W LA PUENTE RD CITY BOUNDARY SENTOUS AVE A - Arterial 0 2 A - AC 2,112 34 71,808 73 5 95 0 8/7/2023 LaPuen 4160E LA PUENTE RD SENTOUS AVE WHITINGHAM DR A - Arterial 0 2 A - AC 2,192 34 74,528 25 93 4 3 8/7/2023 LaPuen 4170E LA PUENTE RD WHITINGHAM DR CITY BOUNDARY A - Arterial 0 2 A - AC 1,462 34 49,708 30 94 5 1 8/7/2023 LAKESDR 1740S LAKES DR LAKES DR GLENDORA AVE. A - Arterial 0 4 A - AC 528 60 31,680 98 0 100 0 8/4/2023 LAKESDR 6930E LAKES DR VINCENT AVE LAKES DR. A - Arterial 0 2 A - AC 665 30 19,950 76 63 21 16 8/4/2023 LAKESDR 6940W LAKES DR LAKES DR VINCENT AVE A - Arterial 0 2 A - AC 607 25 15,175 62 59 27 14 8/4/2023 LarkEl 1830N LARK ELLEN AVE AMAR RD FAIRGROVE AVE A - Arterial 0 2 A - AC 1,816 30 54,480 53 61 37 2 8/2/2023 LarkEl 1840S LARK ELLEN AVE FAIRGROVE AVE AMAR RD A - Arterial 0 2 A - AC 1,821 30 54,630 58 57 43 0 8/2/2023 LarkEl 1850N LARK ELLEN AVE FAIRGROVE AVE MAPLEGROVE ST A - Arterial 0 2 A - AC 1,662 30 49,860 47 70 30 0 8/2/2023 LarkEl 1860S LARK ELLEN AVE MAPLEGROVE ST FAIRGROVE AVE A - Arterial 0 2 A - AC 1,639 30 49,170 59 65 35 0 8/2/2023 LarkEl 1870N LARK ELLEN AVE CITY BOUNDARY MERCED AVE A - Arterial 0 2 A - AC 935 28 26,180 66 34 66 0 8/9/2023 LarkElAve 1880S LARK ELLEN AVE MERCED AVE CITY BOUNDARY A - Arterial 0 2 A - AC 1,056 28 29,568 54 50 47 4 8/9/2023 LarkElAve 1910N LARK ELLEN AVE MERCED AVE CAMERON AVE A - Arterial 0 2 A - AC 2,544 28 71,232 54 56 41 3 8/9/2023 LarkEl 1920S LARK ELLEN AVE STUART AVE CAMERON AVE A - Arterial 0 2 A - AC 2,615 28 73,220 61 34 51 15 8/9/2023 LarkEl 1930N LARK ELLEN AVE CAMERON AVE STUART AVE A - Arterial 0 2 A - AC 2,602 28 72,856 60 34 51 15 8/9/2023
City of West Covina, CA
Pavement Condition Index (PCI) Report - All Streets
Sorted by Rank, Name Order (A-Z)
LarkEl 1940S LARK ELLEN AVE CAMERON AVE MERCED AVE A - Arterial 0 2 A - AC 2,424 28 67,872 59 53 45 2 8/9/2023 LarkEl 1950N LARK ELLEN AVE STUART AVE SOUTH GARVEY AVE A - Arterial 0 1 A - AC 1,103 20 22,060 67 31 69 0 8/9/2023 LarkEl 1960S LARK ELLEN AVE SOUTH GARVEY AVE STUART AVE A - Arterial 0 1 A - AC 1,105 20 22,100 55 46 54 0 8/9/2023 LarkEl 1970N LARK ELLEN AVE SOUTH GARVEY AVE SHAMWOOD ST A - Arterial 0 2 A - AC 848 20 16,960 56 24 76 0 8/9/2023 LarkEl 1980S LARK ELLEN AVE SHAMWOOD ST SOUTH GARVEY AVE A - Arterial 0 2 O - AC/AC 846 20 16,920 58 25 55 19 8/7/2023 LarkEl 1990N LARK ELLEN AVE SHAMWOOD ST WORKMAN AVE A - Arterial 0 2 O - AC/AC 646 20 12,920 44 39 58 3 8/9/2023 LarkEl 2000S LARK ELLEN AVE WORKMAN AVE SHAMWOOD ST A - Arterial 0 2 O - AC/AC 644 20 12,880 50 51 49 0 8/7/2023 LarkEl 2010N LARK ELLEN AVE WORKMAN AVE ROWLAND AVE A - Arterial 0 2 O - AC/AC 1,320 28 36,960 70 35 42 23 8/9/2023 LarkEl 2020S LARK ELLEN AVE ROWLAND AVE WORKMAN AVE A - Arterial 0 2 O - AC/AC 1,329 28 37,212 62 46 54 0 8/7/2023 LarkEl 2030N LARK ELLEN AVE ROWLAND AVE PUENTE AVE A - Arterial 0 2 O - AC/AC 1,322 28 37,016 67 52 47 1 7/27/2023 LarkEl 2040S LARK ELLEN AVE PUENTE AVE ROWLAND AVE A - Arterial 0 2 O - AC/AC 1,328 28 37,154 67 63 37 0 7/27/2023 LarkEl 2050N LARK ELLEN AVE PUENTE AVE CITY BOUNDARY A - Arterial 0 2 A - AC 670 28 18,760 84 35 60 5 7/27/2023 LarkEl 2060S LARK ELLEN AVE PROPERTY LINE OF SCHOOL PUENTE AVE A - Arterial 0 2 A - AC 667 28 18,676 63 69 28 3 7/27/2023 LarkEl 2066S LARK ELLEN AVE BADILLO ST 150 FROM LOUISA AVE A - Arterial 0 2 A - AC 537 28 15,036 77 51 49 0 8/15/2023 LarkEl 2070N LARK ELLEN AVE BADILLO ST CITY BOUNDARY A - Arterial 0 2 A - AC 593 28 16,604 74 59 41 0 7/27/2023 LarkEl 2080S LARK ELLEN AVE CITY BOUNDARY BADILLO ST A - Arterial 0 2 A - AC 582 28 16,296 79 49 47 4 7/27/2023 MercedAve 4720 MERCED AVE AZUSA AVE HOLLENBECK ST A - Arterial 0 2 O - AC/AC 2,580 36 92,880 50 67 33 0 8/4/2023 MercedAve 4740 MERCED AVE HOLLENBECK ST END OF STREET A - Arterial 10 2 O - AC/AC 770 22 16,940 56 12 85 3 8/4/2023 MercedAve 4280SE MERCED AVE SOUTH GARVEY AVE WILLOW AVE A - Arterial 0 2 A - AC 1,129 29 32,659 34 62 37 1 8/14/2023 MercedAve 4290NW MERCED AVE WILLOW AVE SOUTH GARVEY AVE A - Arterial 0 2 A - AC 1,124 29 32,514 42 63 30 7 8/14/2023 Merced 4320SE MERCED AVE WILLOW AVE ORANGE AVE A - Arterial 4 2 A - AC 1,917 29 55,593 34 60 28 13 8/14/2023 Merced 4330NW MERCED AVE ORANGE AVE WILLOW AVE A - Arterial 4 2 A - AC 1,878 29 54,462 52 54 42 3 8/14/2023 MercedAve 4360SE MERCED AVE ORANGE AVE SUNSET AVE A - Arterial 0 2 A - AC 1,952 30 59,112 37 55 25 20 8/14/2023 MercedAve 4370NW MERCED AVE SUNSET AVE ORANGE AVE A - Arterial 0 2 A - AC 1,943 30 58,842 33 54 30 15 8/14/2023 MercedAve 4400SE MERCED AVE SUNSET AVE CALIFORNIA AVE A - Arterial 0 2 O - AC/AC 1,912 28 53,848 70 40 52 8 8/14/2023 MercedAve 4410NW MERCED AVE CALIFORNIA AVE SUNSET AVE A - Arterial 0 2 O - AC/AC 1,913 28 53,876 65 39 49 13 8/14/2023 MercedAve 4440SE MERCED AVE CALIFORNIA AVE GLENDORA AVE A - Arterial 0 2 O - AC/AC 1,271 28 36,538 70 55 43 3 8/14/2023 MercedAve 4450NW MERCED AVE GLENDORA AVE CALIFORNIA AVE A - Arterial 0 2 O - AC/AC 1,268 28 36,454 69 47 42 11 8/14/2023 MercedAve 4480SE MERCED AVE GLENDORA AVE WALNUT AVE A - Arterial 0 2 O - AC/AC 1,530 28 42,994 61 41 58 1 8/4/2023 MercedAve 4490NW MERCED AVE WALNUT AVE GLENDORA AVE A - Arterial 0 2 O - AC/AC 1,482 28 41,650 64 41 58 2 8/4/2023 Merced 4520E MERCED AVE WALNUT AVE CRAIG AVE A - Arterial 0 2 A - AC 823 28 23,044 67 0 100 0 8/4/2023 Merced 4530W MERCED AVE CRAIG AVE WALNUT AVE A - Arterial 0 2 A - AC 825 28 23,100 57 8 86 5 8/4/2023 Merced 4540E MERCED AVE CRAIG AVE SUSANNA AVE A - Arterial 0 2 A - AC 1,110 28 31,080 64 0 94 6 8/4/2023 Merced 4550W MERCED AVE SUSANNA AVE CRAIG AVE A - Arterial 0 2 A - AC 1,114 28 31,192 60 0 100 0 8/4/2023 Merced 4560E MERCED AVE SUSANNA AVE VALINDA AVE A - Arterial 0 2 A - AC 636 28 17,808 70 5 93 2 8/4/2023 Merced 4570W MERCED AVE VALINDA AVE SUSANNA AVE A - Arterial 0 2 A - AC 631 28 17,668 61 0 100 0 8/4/2023 Merced 4600E MERCED AVE VALINDA AVE PRIMEAUX AVE A - Arterial 0 2 O - AC/AC 1,470 28 41,160 76 20 80 0 8/4/2023 Merced 4610W MERCED AVE PRIMEAUX AVE VALINDA AVE A - Arterial 0 2 O - AC/AC 1,473 28 41,244 80 24 76 0 8/4/2023 Merced 4620E MERCED AVE PRIMEAUX AVE LARK ELLEN AVE A - Arterial 0 2 O - AC/AC 1,117 28 31,276 75 0 100 0 8/4/2023 Merced 4630W MERCED AVE LARK ELLEN AVE PRIMEAUX AVE A - Arterial 0 2 O - AC/AC 1,121 28 31,388 76 0 100 0 8/4/2023 Merced 4660E MERCED AVE LARK ELLEN AVE GLENVIEW RD A - Arterial 0 2 O - AC/AC 1,504 28 42,112 74 0 75 25 8/4/2023 Merced 4670W MERCED AVE GLENVIEW RD LARK ELLEN AVE A - Arterial 0 2 O - AC/AC 1,504 28 42,112 68 35 65 0 8/4/2023 MercedAve 4680E MERCED AVE GLENVIEW RD AZUSA AVE A - Arterial 0 2 A - AC 1,206 28 33,520 46 64 36 0 8/4/2023 MercedAve 4690W MERCED AVE AZUSA AVE GLENVIEW RD A - Arterial 0 2 O - AC/AC 1,207 28 33,548 46 61 39 0 8/4/2023 Nogale 4050S NOGALES ST AMAR RD FRANCESCA DR A - Arterial 0 2 O - AC/AC 988 32 31,616 87 29 71 0 8/7/2023 Nogale 4060S NOGALES ST FRANCESCA DR SHADOW OAK DR A - Arterial 0 2 O - AC/AC 2,108 32 67,456 82 61 37 2 8/7/2023 Nogale 4070S NOGALES ST SHAKESPEARE DR CITY BOUNDARY A - Arterial 0 2 O - AC/AC 1,459 32 46,688 66 69 31 0 8/7/2023 Nogale 4080S NOGALES ST SHADOW OAK DR SHAKESPEARE DR A - Arterial 0 2 O - AC/AC 1,247 32 39,904 56 79 19 3 8/7/2023 Nogale 4090N NOGALES ST LA PUENTE RD CITY BOUNDARY A - Arterial 0 2 O - AC/AC 820 32 26,240 50 78 21 1 8/7/2023 Nogale 4100N NOGALES ST 167FT NO VALLEY VIEW AVE 523FT NO FENMEAD ST A - Arterial 0 3 O - AC/AC 869 40 34,760 90 20 76 4 8/7/2023 Nogale 4110S NOGALES ST 127FT NO FENMEAD ST 167FT NO VALLEY VIEW AVE A - Arterial 0 3 O - AC/AC 473 40 18,920 63 76 24 0 8/7/2023 NOGALE 4200N NOGALES ST SOUTH CITY LIMIT 167FT NO VALLEY VIEW AVE A - Arterial 0 3 P - PCC 873 33 28,809 98 0 34 66 8/7/2023 NOGALE 4200S NOGALES ST 167FT NO VALLEY VIEW AVE SOUTH CITY LIMIT A - Arterial 0 3 P - PCC 873 33 28,809 98 0 100 0 8/7/2023 OrangeAve 3645 ORANGE AVE MERCED AVE MOSSBERG AVE C - Collector 4 2 O - AC/AC 700 36 25,200 100 0 0 0 8/11/2023 OrangeAve 3650 ORANGE AVE MOSSBERG AVE SOUTH GARVEY AVE C - Collector 4 2 O - AC/AC 1,837 40 73,480 100 0 0 0 8/11/2023 OrangeAve 3730 ORANGE AVE NORTH GARVEY AVE PUENTE AVE C - Collector 1 2 A - AC 3,466 38 131,708 67 58 37 4 8/2/2023 OrangeAve 3770 ORANGE AVE PUENTE AVE CITY BOUNDARY C - Collector 1 2 O - AC/AC 1,410 36 50,760 57 55 32 12 7/28/2023 Orange 3610N ORANGE AVE FAIRGROVE AVE FRANCISQUITO AVE C - Collector 4 1 O - AC/AC 3,227 19 61,313 43 71 29 0 8/14/2023 Orange 3630N ORANGE AVE FRANCISQUITO AVE MERCED AVE C - Collector 4 1 A - AC 3,598 18 64,764 100 0 0 0 8/4/2023 Orange 3640S ORANGE AVE MERCED AVE FRANCISQUITO AVE C - Collector 4 1 A - AC 3,627 18 65,286 100 0 0 0 8/4/2023 Orange 3690N ORANGE AVE SOUTH GARVEY AVE CAMERON AVE C - Collector 4 1 O - AC/AC 268 25 6,700 100 0 0 0 8/11/2023 Orange 3700S ORANGE AVE CAMERON AVE SOUTH GARVEY AVE C - Collector 4 1 O - AC/AC 268 31 8,308 100 0 0 0 8/11/2023 Orange 3710N ORANGE AVE CAMERON AVE FREEWAY 10 C - Collector 4 1 A - AC 430 14 5,880 69 29 71 0 8/14/2023 Orange 3720S ORANGE AVE FREEWAY 10 CAMERON AVE C - Collector 4 1 A - AC 425 25 10,625 81 31 69 0 8/14/2023 Orange 3800S ORANGE AVE SAN BERNARDINO RD CITY BOUNDARY C - Collector 1 1 A - AC 1,638 17 27,846 37 61 30 9 7/28/2023 Pacifi 8300E PACIFIC AVE CITY BOUNDARY WILLOW AVE A - Arterial 0 2 A - AC 907 30 27,210 87 22 39 39 8/14/2023 Pacifi 8310N PACIFIC AVE WILLOW AVE CITY BOUNDARY A - Arterial 0 2 A - AC 923 30 27,690 46 85 9 7 8/14/2023 Pacifi 8320S PACIFIC AVE WILLOW AVE CAMERON AVE A - Arterial 0 2 A - AC 409 30 12,270 55 85 10 5 8/14/2023 Pacifi 8325N PACIFIC AVE CAMERON AVE WILLOW AVE A - Arterial 0 2 A - AC 519 30 15,570 41 81 8 11 8/14/2023 PacifiAve 8350N PACIFIC AVE NORTH GARVEY AVE PACIFIC LN A - Arterial 0 2 A - AC 946 30 29,024 39 84 16 0 8/14/2023 PacifiAve 8360S PACIFIC AVE CAMERON AVE NORTH GARVEY AVE A - Arterial 0 2 A - AC 1,044 30 31,866 33 85 15 0 8/14/2023 PLAZADR 6890E PLAZA DR CALIFORNIA AVE VINCENT AVE A - Arterial 0 3 A - AC 324 34 11,016 83 22 78 0 8/11/2023 PLAZADR 6900W PLAZA DR VINCENT AVE CALIFORNIA AVE A - Arterial 0 2 A - AC 287 22 6,314 96 0 100 0 8/11/2023 PuenteAve 5240E PUENTE AVE CITY BOUNDARY ORANGE AVE A - Arterial 0 1 O - AC/AC 1,037 25 25,913 51 82 16 2 8/2/2023 PuenteAve 5250W PUENTE AVE ORANGE AVE CITY BOUNDARY A - Arterial 0 1 O - AC/AC 1,037 28 28,874 71 71 29 0 8/2/2023 Puente 5280E PUENTE AVE ORANGE AVE NORA AVE A - Arterial 1 2 O - AC/AC 1,119 29 32,277 54 54 40 5 8/2/2023 Puente 5290W PUENTE AVE NORA AVE ORANGE AVE A - Arterial 1 2 O - AC/AC 1,119 26 28,938 46 70 30 0 7/28/2023
City of West Covina, CA
Pavement Condition Index (PCI) Report - All Streets
Sorted by Rank, Name Order (A-Z)
PuenteAve 5300E PUENTE AVE NORA AVE SUNSET AVE A - Arterial 0 2 O - AC/AC 1,272 28 35,792 49 61 39 0 8/2/2023 PuenteAve 5310W PUENTE AVE SUNSET AVE NORA AVE A - Arterial 0 2 O - AC/AC 1,276 28 36,064 51 69 31 1 7/28/2023 PuenteAve 5340E PUENTE AVE SUNSET AVE VINCENT AVE A - Arterial 1 2 O - AC/AC 2,709 28 76,707 50 68 32 0 8/3/2023 PuenteAve 5350W PUENTE AVE VINCENT AVE SUNSET AVE A - Arterial 1 2 O - AC/AC 2,709 28 76,707 56 59 37 4 7/28/2023 Puente 5380E PUENTE AVE VINCENT AVE LARK ELLEN AVE A - Arterial 0 2 O - AC/AC 2,673 28 74,844 59 47 53 0 8/3/2023 Puente 5390W PUENTE AVE LARK ELLEN AVE VINCENT AVE A - Arterial 0 2 O - AC/AC 2,664 28 74,592 56 59 35 6 8/3/2023 PuenteAve 5420E PUENTE AVE LARK ELLEN AVE AZUSA AVE A - Arterial 0 2 O - AC/AC 2,676 28 75,306 57 43 30 27 8/3/2023 PuenteAve 5430W PUENTE AVE AZUSA AVE LARK ELLEN AVE A - Arterial 0 2 O - AC/AC 2,685 28 75,558 57 71 29 0 8/3/2023 Puente 5460E PUENTE AVE AZUSA AVE CITY BOUNDARY A - Arterial 0 2 A - AC 1,359 20 25,900 52 62 38 0 8/3/2023 Puente 5470W PUENTE AVE CITY BOUNDARY AZUSA AVE A - Arterial 0 2 A - AC 1,352 20 25,248 61 58 37 6 8/3/2023 Rowlan 5480E ROWLAND AVE NORA AVE SUNSET AVE C - Collector 1 1 O - AC/AC 1,168 19 21,287 78 34 51 14 8/11/2023 RowlanAve 5500E ROWLAND AVE SUNSET AVE VINCENT AVE C - Collector 1 1 O - AC/AC 2,747 19 53,039 47 59 37 4 8/2/2023 RowlanAve 5510W ROWLAND AVE VINCENT AVE SUNSET AVE C - Collector 1 1 O - AC/AC 2,741 19 52,925 44 63 37 0 8/2/2023 RowlanAve 5540E ROWLAND AVE VINCENT AVE LARK ELLEN AVE C - Collector 2 1 O - AC/AC 2,850 19 49,595 41 62 32 7 7/27/2023 RowlanAve 5550W ROWLAND AVE LARK ELLEN AVE VINCENT AVE C - Collector 2 1 O - AC/AC 2,847 18 48,302 40 68 32 0 7/27/2023 Rowlan 5580E ROWLAND AVE LARK ELLEN AVE AZUSA AVE A - Arterial 2 2 A - AC 2,610 28 68,594 28 78 18 5 7/27/2023 Rowlan 5590W ROWLAND AVE AZUSA AVE LARK ELLEN AVE A - Arterial 2 2 A - AC 2,605 28 70,628 39 59 13 27 7/27/2023 Rowlan 5620E ROWLAND AVE AZUSA AVE CITY BOUNDARY A - Arterial 3 2 O - AC/AC 1,269 27 32,813 49 63 31 6 7/27/2023 Rowlan 5630W ROWLAND AVE CITY BOUNDARY AZUSA AVE A - Arterial 3 2 O - AC/AC 1,284 27 33,073 41 75 25 0 7/27/2023 SanBer 5100E SAN BERNARDINO RD CITY BOUNDARY ORANGE AVE A - Arterial 0 2 O - AC/AC 2,372 36 85,392 66 35 40 24 8/11/2023 SanBer 5110W SAN BERNARDINO RD ORANGE AVE CITY BOUNDARY A - Arterial 0 2 O - AC/AC 2,363 36 81,068 53 48 33 19 8/11/2023 SentouAve 8660 SENTOUS AVE END OF STREET LA PUENTE RD A - Arterial 0 2 A - AC 1,917 36 69,012 64 36 64 0 8/7/2023 SentouAve 8610N SENTOUS AVE VALLEY BLVD VALLEY VIEW AVE A - Arterial 0 1 A - AC 1,096 25 27,400 75 0 100 0 8/7/2023 SentouAve 8620S SENTOUS AVE CITY BOUNDARY VALLEY BLVD A - Arterial 0 1 A - AC 761 34 25,874 79 0 100 0 8/7/2023 Sentou 8630N SENTOUS AVE VALLEY VIEW AVE HOLLINGWORTH ST A - Arterial 0 1 O - AC/AC 768 23 17,664 68 46 54 0 8/7/2023 Sentou 8640N SENTOUS AVE HOLLINGWORTH ST LA PUENTE RD A - Arterial 0 1 O - AC/AC 1,636 23 37,628 78 0 100 0 8/7/2023 Shadow 3950N SHADOW OAK DR OAKGATE AVE AMAR RD A - Arterial 0 2 A - AC 1,850 28 51,800 58 76 24 0 8/3/2023 Shadow 3955N SHADOW OAK DR STEPHANIE DR OAKGATE DR A - Arterial 0 2 A - AC 1,496 28 41,888 58 71 24 6 8/3/2023 Shadow 3960S SHADOW OAK DR AMAR RD OAKGATE AVE A - Arterial 0 2 A - AC 1,852 28 51,856 68 80 20 0 8/3/2023 Shadow 3965S SHADOW OAK DR OAKGATE AVE STEPHANIE DR A - Arterial 0 2 A - AC 1,568 28 43,904 55 80 14 6 8/3/2023 Shadow 3970E SHADOW OAK DR STEPHANIE DR SHAKESPEARE DR A - Arterial 0 2 A - AC 1,704 28 47,712 64 69 28 3 8/3/2023 Shadow 3975E SHADOW OAK DR SHAKESPEARE DR NOGALES ST A - Arterial 0 2 A - AC 1,693 28 47,404 68 71 29 0 8/3/2023 Shadow 3980W SHADOW OAK DR SHAKESPEARE DR STEPHANIE DR A - Arterial 0 2 A - AC 1,704 28 47,712 76 38 62 0 8/3/2023 Shadow 3985W SHADOW OAK DR NOGALES ST SHAKESPEARE DR A - Arterial 0 2 A - AC 1,723 28 48,244 79 25 75 0 8/3/2023 Sunset 1310N SUNSET AVE FAIRGROVE AVE DELVALE ST A - Arterial 0 2 O - AC/AC 1,067 37 39,479 52 70 30 0 8/14/2023 Sunset 1320S SUNSET AVE DELVALE ST FAIRGROVE AVE A - Arterial 0 2 O - AC/AC 1,067 37 39,479 55 67 33 0 8/14/2023 Sunset 1330N SUNSET AVE DELVALE ST FRANCISQUITO AVE A - Arterial 0 2 O - AC/AC 1,166 37 43,142 47 65 29 6 8/14/2023 Sunset 1335S SUNSET AVE FRANCISQUITO AVE DELVALE ST A - Arterial 0 2 O - AC/AC 1,165 37 43,105 63 65 35 0 8/14/2023 Sunset 1340N SUNSET AVE FRANCISQUITO AVE DURNESS ST A - Arterial 0 2 O - AC/AC 2,379 37 88,023 43 71 29 0 8/14/2023 Sunset 1350S SUNSET AVE DURNESS ST FRANCISQUITO AVE A - Arterial 0 2 O - AC/AC 2,398 37 88,726 53 71 29 0 8/15/2023 Sunset 1360N SUNSET AVE DURNESS ST MERCED AVE A - Arterial 0 2 O - AC/AC 1,195 37 44,215 72 57 29 14 8/15/2023 Sunset 1370S SUNSET AVE MERCED AVE DURNESS ST A - Arterial 0 2 O - AC/AC 1,191 37 44,067 46 73 27 0 8/15/2023 Sunset 1385N SUNSET AVE MERCED AVE VINE AVE A - Arterial 0 2 O - AC/AC 1,189 31 36,859 80 49 51 0 8/14/2023 Sunset 1387N SUNSET AVE VINE AVE CAMERON AVE A - Arterial 0 2 O - AC/AC 1,420 31 44,020 71 65 33 2 8/14/2023 Sunset 1395S SUNSET AVE VINE AVE MERCED AVE A - Arterial 0 2 O - AC/AC 1,190 31 36,890 66 69 28 3 8/8/2023 SunsetAve 1397S SUNSET AVE CAMERON AVE VINE AVE A - Arterial 0 2 O - AC/AC 1,481 31 46,031 58 66 33 1 8/8/2023 SunsetAve 1420N SUNSET AVE CAMERON AVE INTERSECTION A - Arterial 0 2 O - AC/AC 947 31 29,357 55 80 20 0 8/14/2023 SunsetAve 1430S SUNSET AVE WEST COVINA PKWY CAMERON AVE A - Arterial 0 2 O - AC/AC 951 33 31,688 59 51 32 17 8/8/2023 SunsetAve 1460N SUNSET AVE WEST COVINA PKWY PLAZA DR A - Arterial 0 2 O - AC/AC 793 38 29,504 78 54 46 0 8/10/2023 Sunset 1470S SUNSET AVE PLAZA DR. WEST COVINA PKWY A - Arterial 0 2 O - AC/AC 695 38 26,410 83 57 43 0 8/11/2023 Sunset 1480N SUNSET AVE PLAZA DR. SO. BORDER A - Arterial 0 2 A - AC 565 38 21,470 75 59 41 0 8/10/2023 Sunset 1490S SUNSET AVE SO. BORDER PLAZA DR. A - Arterial 0 2 A - AC 546 36 19,156 86 55 45 0 8/11/2023 Sunset 1500N SUNSET AVE NO. BORDER WORKMAN AVE A - Arterial 0 2 A - AC 1,341 38 50,238 87 34 53 13 8/11/2023 Sunset 1510S SUNSET AVE WORKMAN AVE NO. BORDER A - Arterial 0 2 A - AC 1,337 38 49,286 88 37 63 0 8/11/2023 Sunset 1520N SUNSET AVE WORKMAN AVE ROWLAND AVE A - Arterial 0 2 A - AC 1,306 38 46,736 82 66 34 0 8/10/2023 Sunset 1530S SUNSET AVE ROWLAND AVE WORKMAN AVE A - Arterial 0 2 A - AC 1,307 34 42,418 87 55 37 8 8/11/2023 Sunset 1540N SUNSET AVE ROWLAND AVE PUENTE AVE A - Arterial 0 2 A - AC 1,287 38 44,922 44 65 24 10 8/10/2023 Sunset 1550S SUNSET AVE PUENTE AVE ROWLAND AVE A - Arterial 0 2 A - AC 1,323 38 48,274 56 64 33 3 8/11/2023 Sunset 1560N SUNSET AVE PUENTE AVE SOUTH CITY BOUNDARY A - Arterial 0 2 A - AC 747 38 28,386 34 71 23 5 8/3/2023 Sunset 1566S SUNSET AVE SOUTH CITY BOUNDARY PUENTE AVE A - Arterial 0 2 A - AC 755 38 28,690 38 74 26 0 8/3/2023 Sunset 1337S SUNSET AVE FRONTAGE RD FRANCISQUITO AVE DELVALE ST A - Arterial 4 2 O - AC/AC 1,059 27 28,593 85 0 80 20 6/30/2023 Sunset 1562N SUNSET AVE-FRONTAGE RD CITY BOUNDARY (N/ PUENTE AVE) END OF STREET A - Arterial 1 2 A - AC 736 25 18,400 41 58 35 7 8/11/2023 Temple 4010 TEMPLE AVE AMAR RD GLENRIDGE CIR C - Collector 11 2 O - AC/AC 615 35 21,525 89 0 84 16 7/12/2023 Temple 4020 TEMPLE AVE GLENRIDGE CIR CITY BOUNDARY C - Collector 11 2 O - AC/AC 605 35 21,175 89 0 100 0 7/12/2023 TOLUCA 9G9469 TOLUCA AVE CAMERON AVE WEST COVINA PKWY C - Collector 4 2 O - AC/AC 800 28 22,400 100 0 0 0 8/8/2023 TOLUCA 9G9470 TOLUCA AVE WEST COVINA PKWY CAMERON AVE C - Collector 4 2 O - AC/AC 800 28 22,400 100 0 0 0 8/8/2023 ValindAve 7440N VALINDA AVE CITY BOUNDARY MERCED AVE A - Arterial 0 2 O - AC/AC 678 29 20,007 13 95 5 0 8/8/2023 ValindAve 7450S VALINDA AVE MERCED AVE CITY BOUNDARY A - Arterial 0 2 O - AC/AC 975 29 28,248 22 85 15 0 8/8/2023 ValindAve 7480N VALINDA AVE MERCED AVE VINE AVE A - Arterial 0 2 O - AC/AC 1,318 29 38,452 48 65 28 7 8/8/2023 ValindAve 7490S VALINDA AVE VINE AVE MERCED AVE A - Arterial 0 2 O - AC/AC 1,314 29 38,336 43 72 16 12 8/8/2023 Valind 7520N VALINDA AVE VINE AVE CAMERON AVE A - Arterial 0 2 O - AC/AC 1,272 29 36,168 67 54 46 0 8/8/2023 Valind 7530S VALINDA AVE CAMERON AVE VINE AVE A - Arterial 0 2 O - AC/AC 1,272 29 36,888 42 67 33 0 8/8/2023 ValindAve 7560N VALINDA AVE CAMERON AVE SERVICE AVE A - Arterial 0 2 O - AC/AC 1,318 29 38,772 33 84 15 1 8/8/2023 ValindAve 7570S VALINDA AVE SERVICE AVE CAMERON AVE A - Arterial 0 2 O - AC/AC 1,317 29 38,743 32 78 19 3 8/8/2023 Valind 7600N VALINDA AVE SERVICE AVE GLENDORA AVE A - Arterial 0 2 O - AC/AC 777 29 22,533 39 64 29 7 8/8/2023 Valind 7605N VALINDA AVE GLENDORA AVE VINCENT AVE A - Arterial 5 2 O - AC/AC 413 35 14,455 60 55 39 6 8/11/2023 Valind 7610S VALINDA AVE GLENDORA AVE SERVICE AVE A - Arterial 0 2 O - AC/AC 723 29 20,967 43 71 24 6 8/8/2023
City of West Covina, CA
Pavement Condition Index (PCI) Report - All Streets
Sorted by Rank, Name Order (A-Z)
Valind 7615S VALINDA AVE VINCENT AVE GLENDORA AVE A - Arterial 5 2 O - AC/AC 409 35 14,315 44 65 22 13 8/11/2023 Valley 4180E VALLEY BLVD CITY BOUNDARY NOGALES ST A - Arterial 0 2 O - AC/AC 905 33 29,865 76 0 100 0 8/7/2023 Valley 4190W VALLEY BLVD NOGALES ST CITY BOUNDARY A - Arterial 0 3 O - AC/AC 905 33 29,865 74 0 89 11 8/7/2023 Valley 4220E VALLEY BLVD NOGALES ST SENTOUS AVE A - Arterial 0 2 O - AC/AC 1,900 33 62,700 90 0 100 0 8/7/2023 Valley 4230W VALLEY BLVD SENTOUS AVE NOGALES ST A - Arterial 0 2 O - AC/AC 1,900 33 62,700 85 54 44 2 8/7/2023 Valley 4240E VALLEY BLVD SENTOUS AVE MORGANFIELD AVE A - Arterial 0 2 O - AC/AC 1,687 34 57,358 91 0 100 0 8/7/2023 Valley 4250W VALLEY BLVD MORGANFIELD AVE SENTOUS AVE A - Arterial 0 2 O - AC/AC 1,687 33 55,671 86 41 52 6 8/7/2023 Valley 4260E VALLEY BLVD MORGANFIELD AVE CITY BOUNDARY A - Arterial 0 2 O - AC/AC 765 33 25,245 89 0 100 0 8/7/2023 Valley 4270W VALLEY BLVD CITY BOUNDARY MORGANFIELD AVE A - Arterial 0 3 O - AC/AC 765 32 24,480 80 30 70 0 8/7/2023 Vincen 1705N VINCENT AVE GLENDORA AVE END OF PCC A - Arterial 0 2 P - PCC 227 40 6,600 90 25 58 17 8/8/2023 Vincen 1710S VINCENT AVE WEST COVINA PKWY GLENDORA AVE A - Arterial 0 2 A - AC 664 32 18,674 92 0 100 0 8/8/2023 Vincen 1720N VINCENT AVE GLENDORA AVE WEST COVINA PKWY A - Arterial 0 2 A - AC 646 43 26,002 85 44 56 0 8/8/2023 Vincen 1730N VINCENT AVE WEST COVINA PKWY LAKES DR. A - Arterial 0 3 P - PCC 657 34 17,646 91 19 39 42 8/8/2023 Vincen 1735S VINCENT AVE LAKES DR WEST COVINA PKWY A - Arterial 0 3 P - PCC 625 32 17,460 96 0 100 0 8/8/2023 Vincen 1750N VINCENT AVE LAKES DR. STATE R/W A - Arterial 0 2 P - PCC 300 39 11,700 93 0 100 0 8/11/2023 VINCEN 1751N VINCENT AVE STATE R/W WORKMAN AVE C - Collector 0 2 A - AC 600 55 33,000 65 47 53 0 8/11/2023 Vincen 1760S VINCENT AVE STATE R/W LAKES DR. A - Arterial 0 2 P - PCC 300 40 12,000 93 25 75 0 8/11/2023 VINCEN 1761S VINCENT AVE WORKMAN AVE. STATE R/W A - Arterial 0 2 A - AC 600 50 30,000 75 31 69 0 8/11/2023 Vincen 1770N VINCENT AVE WORKMAN AVE ROWLAND AVE A - Arterial 0 2 A - AC 1,276 30 38,280 43 58 29 13 8/7/2023 Vincen 1780S VINCENT AVE ROWLAND AVE WORKMAN AVE A - Arterial 0 2 A - AC 1,286 30 38,580 58 66 34 0 8/4/2023 Vincen 1790N VINCENT AVE ROWLAND AVE PUENTE AVE A - Arterial 0 2 A - AC 1,279 30 38,370 49 57 29 14 8/7/2023 Vincen 1800S VINCENT AVE PUENTE AVE ROWLAND AVE A - Arterial 0 2 A - AC 1,266 30 37,980 55 58 26 16 8/4/2023 Vincen 1810N VINCENT AVE PUENTE AVE BADILLO ST A - Arterial 0 2 O - AC/AC 1,292 30 38,760 56 57 28 15 8/3/2023 Vincen 1820S VINCENT AVE BADILLO ST PUENTE AVE A - Arterial 0 2 O - AC/AC 1,289 30 38,670 65 69 25 5 7/28/2023 VineAve 4820 VINE AVE GLENDORA AVE HOLLY PL C - Collector 6 2 A - AC 1,805 36 64,980 62 54 38 8 8/9/2023 VineAve 4840 VINE AVE HOLLY PL VALINDA AVE C - Collector 6 2 O - AC/AC 1,292 36 46,512 79 0 83 17 8/9/2023 VineAve 4880 VINE AVE VALINDA AVE PIMA AVE C - Collector 6 2 O - AC/AC 1,480 36 53,280 64 49 50 1 8/9/2023 VineAve 4900 VINE AVE PIMA AVE LARK ELLEN AVE C - Collector 6 2 O - AC/AC 1,105 36 39,780 77 0 75 25 8/9/2023 VineAve 4940 VINE AVE LARK ELLEN AVE GLENVIEW RD C - Collector 7 2 O - AC/AC 1,440 36 51,840 86 0 100 0 8/9/2023 VineAve 4960 VINE AVE GLENVIEW RD AZUSA AVE C - Collector 7 2 O - AC/AC 1,180 36 42,480 77 68 32 0 8/9/2023 VineAve 5000 VINE AVE AZUSA AVE GLENN ALAN AVE C - Collector 8 2 O - AC/AC 1,180 36 42,480 71 63 37 0 8/8/2023 VineAve 5020 VINE AVE GLENN ALAN AVE LOLITA ST C - Collector 8 2 O - AC/AC 582 36 20,952 82 33 67 0 8/8/2023 VineAve 5040 VINE AVE LOLITA ST HOLLENBECK ST C - Collector 8 2 O - AC/AC 858 36 30,888 87 0 100 0 8/8/2023 VineAve 5080 VINE AVE HOLLENBECK ST CITRUS ST C - Collector 8 2 O - AC/AC 2,625 36 94,500 74 39 58 4 8/8/2023 Walnut 9000 WALNUT AVE SOUTH CITY BOUNDARY MERCED AVE C - Collector 6 2 A - AC 1,276 36 45,936 47 32 55 13 6/29/2023 Walnut 9020 WALNUT AVE MERCED AVE VINE AVE C - Collector 6 2 A - AC 1,276 36 45,936 79 59 32 9 6/29/2023 WestcoPw 7240S WEST COVINA PKWY SOUTH GARVEY AVE TOLUCA AVE A - Arterial 0 2 A - AC 607 32 19,424 55 61 33 6 8/8/2023 WestcoPw 7250N WEST COVINA PKWY TOLUCA AVE SOUTH GARVEY AVE A - Arterial 0 2 A - AC 619 32 19,808 50 90 10 0 8/14/2023 WestcoPw 7280S WEST COVINA PKWY TOLUCA AVE SUNSET AVE A - Arterial 0 2 A - AC 962 32 30,784 23 80 13 7 8/8/2023 WestcoPw 7290N WEST COVINA PKWY SUNSET AVE TOLUCA AVE A - Arterial 0 2 A - AC 962 32 30,784 38 94 6 0 8/14/2023 WestcoPw 7320E WEST COVINA PKWY SUNSET AVE FASHION PLAZA WY A - Arterial 0 2 O - AC/AC 1,564 31 42,877 36 92 8 0 8/11/2023 WestcoPw 7330W WEST COVINA PKWY FASHION PLAZA WY SUNSET AVE A - Arterial 0 2 O - AC/AC 1,524 31 46,167 37 80 14 5 8/11/2023 WestcoPw 7360E WEST COVINA PKWY FASHION PLAZA WY CALIFORNIA AVE A - Arterial 0 2 O - AC/AC 897 31 28,217 38 90 10 0 8/11/2023 WestcoPw 7370W WEST COVINA PKWY CALIFORNIA AVE FASHION PLAZA WY A - Arterial 0 2 O - AC/AC 885 31 26,693 46 78 22 0 8/11/2023 WestcoPw 7400E WEST COVINA PKWY CALIFORNIA AVE VINCENT AVE A - Arterial 0 2 O - AC/AC 1,077 35 36,239 33 96 4 0 8/11/2023 WestcoPw 7410W WEST COVINA PKWY VINCENT AVE CALIFORNIA AVE A - Arterial 0 2 O - AC/AC 1,080 35 33,776 42 77 23 0 8/11/2023 WillowAve 5680 WILLOW AVE FARLINGTON ST YARNELL ST C - Collector 4 2 O - AC/AC 550 34 18,700 100 0 0 0 8/4/2023 WillowAve 5700 WILLOW AVE YARNELL ST ITUNI ST C - Collector 4 2 O - AC/AC 940 36 33,840 99 0 0 100 8/4/2023 WillowAve 5720 WILLOW AVE ITUNI ST MERCED AVE C - Collector 4 2 A - AC 830 36 29,880 99 0 0 100 8/4/2023 WillowAve 5760 WILLOW AVE SOUTH GARVEY AVE MERCED AVE C - Collector 4 2 A - AC 1,150 36 41,400 85 0 93 7 8/4/2023 WillowAve 5780 WILLOW AVE NORTH GARVEY AVE PACIFIC AVE C - Collector 1 2 A - AC 2,025 38 76,950 68 48 34 18 8/11/2023 WillowAve 5820 WILLOW AVE PACIFIC AVE CITY BOUNDARY C - Collector 1 2 A - AC 1,360 36 48,960 76 24 42 33 8/14/2023 WillowAve 5660N WILLOW AVE FRANCISQUITO AVE FARLINGTON ST C - Collector 4 1 A - AC 1,319 19 25,061 98 0 0 100 8/4/2023 WillowAve 5670S WILLOW AVE FARLINGTON ST FRANCISQUITO AVE C - Collector 4 1 A - AC 1,329 19 25,251 99 0 2 98 8/4/2023 WorkmaAve 8040 WORKMAN AVE ORANGE AVE NORA AVE C - Collector 1 2 A - AC 1,215 34 41,310 82 21 79 0 7/21/2023 WorkmaAve 8060 WORKMAN AVE YALETON AVE SUNSET AVE C - Collector 1 2 O - AC/AC 685 34 23,290 95 0 100 0 8/2/2023 WorkmaAve 8090 WORKMAN AVE NORA AVE YALETON AVE C - Collector 1 2 O - AC/AC 408 36 14,688 97 0 88 12 8/2/2023 WorkmaAve 8110 WORKMAN AVE SUNSET AVE VINCENT AVE C - Collector 1 2 O - AC/AC 2,760 20 55,200 32 63 27 10 8/10/2023 WorkmaAve 8150 WORKMAN AVE VINCENT AVE ASTELL AVE C - Collector 2 2 O - AC/AC 2,175 38 82,650 42 62 34 4 8/3/2023 WorkmaAve 8170 WORKMAN AVE ASTELL AVE LARK ELLEN AVE C - Collector 2 2 O - AC/AC 730 38 27,740 88 43 57 0 8/3/2023 WorkmaAve 8190 WORKMAN AVE LARK ELLEN AVE HOMEREST AVE C - Collector 2 2 O - AC/AC 1,260 40 50,400 34 69 27 4 8/3/2023 WorkmaAve 8210 WORKMAN AVE HOMEREST AVE AZUSA AVE C - Collector 2 2 O - AC/AC 1,313 40 52,520 76 31 69 0 8/3/2023 Workma 8230E WORKMAN AVE AZUSA AVE CITY BOUNDARY A - Arterial 0 1 O - AC/AC 1,294 21 27,174 35 52 41 7 8/3/2023 Workma 8240W WORKMAN AVE CITY BOUNDARY AZUSA AVE A - Arterial 0 1 O - AC/AC 1,297 21 27,237 30 62 36 2 8/3/2023 Workma 8250E WORKMAN AVE CITY BOUNDARY CITRUS ST A - Arterial 0 2 O - AC/AC 626 24 14,784 99 0 100 0 7/28/2023 Workma 8260W WORKMAN AVE CITRUS ST CITY BOUNDARY A - Arterial 0 1 O - AC/AC 628 24 14,880 99 0 100 0 7/28/2023 114.2 18,111,498
Locals ACACIA 4G5040 ACACIA LN CORTEZ ST END OF STREET R - Residential/Local 8 2 O - AC/AC 234 28 6,552 73 0 100 0 6/27/2023 ACRIDG 4H5150 ACRIDGE DR GRAND AVE END OF STREET R - Residential/Local 9 2 O - AC/AC 606 28 16,968 75 69 31 0 7/26/2023 ADAMS 3B1200 ADAMS DR MORRIS AVE ORANGE AVE R - Residential/Local 1 2 O - AC/AC 809 30 24,270 66 71 29 0 7/3/2023 ADRIAN 9F9450 ADRIENNE DR SHADOW OAK DR BRENDA ST R - Residential/Local 11 2 A - AC 800 35 28,000 68 27 59 13 7/14/2023 ADRIAN 9F9451 ADRIENNE DR BRENDA ST WOODGATE R - Residential/Local 11 2 A - AC 1,420 36 51,120 65 25 53 21 7/14/2023 ADUL 7D8860 ADUL ST GRAND VIEW LN END OF STREET R - Residential/Local 7 2 A - AC 700 30 21,000 82 6 66 28 8/9/2023 AJAX 8E9245 AJAX CIRCLE RODNEY RD END OF STREET R - Residential/Local 7 2 O - AC/AC 150 28 4,200 97 0 100 0 7/14/2023 ALASKA 5E6670 ALASKA ST GLENVIEW RD AZUSA AVE R - Residential/Local 7 2 O - AC/AC 1,171 30 35,130 87 39 61 0 6/28/2023 ALASKA 5E6920 ALASKA ST AZUSA AVE DONNA BETH AVE R - Residential/Local 8 2 A - AC 450 30 13,500 47 74 26 0 6/26/2023
City of West Covina, CA
Pavement Condition Index (PCI) Report - All Streets
Sorted by Rank, Name Order (A-Z)
ALASKA 5F7130 ALASKA ST HOLLENBECK ST END OF STREET R - Residential/Local 8 2 O - AC/AC 260 30 7,800 36 66 20 14 7/3/2023 ALASKA 5F7410 ALASKA ST HOLLENBECK ST MANZANITA DR R - Residential/Local 8 2 A - AC 1,320 38 50,160 68 39 56 4 7/3/2023 ALASKA 5G7540 ALASKA ST CITRUS ST MAGNOLIA AVE R - Residential/Local 8 2 A - AC 510 30 15,300 47 51 49 0 7/3/2023 ALICIA 9F9455 ALICIA ST 2400 ARLINE ST 2456 ARLINE ST R - Residential/Local 11 2 O - AC/AC 880 37 32,560 85 0 47 53 7/14/2023 ALISAL 3B1230 ALISAL ST LA SENA AVE END OF STREET R - Residential/Local 1 2 O - AC/AC 396 28 11,088 70 42 53 5 7/3/2023 ALISAL 3C1660 ALISAL ST ORANGE ST FRIJO AVE R - Residential/Local 1 2 A - AC 574 30 17,220 72 70 30 0 6/29/2023 ALMANA 7E7000 ALMANAC DR AUTUMN DR ALMANAC DR R - Residential/Local 7 2 A - AC 285 26 7,410 83 32 68 0 7/19/2023 ALMANA 7E7020 ALMANAC DR NEWCREST DR ALMANAC DR R - Residential/Local 7 2 A - AC 520 26 13,520 85 0 100 0 7/19/2023 ALMIRA 4F4770 ALMIRANTE DR CORTEZ ST END OF STREET R - Residential/Local 8 2 O - AC/AC 600 30 18,000 66 39 61 0 6/27/2023 ALPINE 6F8776 ALPINE DR HIGHSPIRE DR HILLSIDE DR. R - Residential/Local 10 2 A - AC 615 38 23,370 57 24 76 0 7/21/2023 ALPINE 6F8777 ALPINE DR HIGHSPIRE DR END OF STREET R - Residential/Local 10 2 A - AC 535 27 14,445 42 47 43 10 7/21/2023 ALTAMI 9E9315 ALTAMIRA CIR ALTAMIRA DR END OF STREET R - Residential/Local 11 2 O - AC/AC 133 29 3,857 67 0 84 16 7/12/2023 ALTAMI 9F9313 ALTAMIRA DR GREENLEAF DR DAWN RIDGE PL R - Residential/Local 11 2 O - AC/AC 1,106 36 39,816 76 0 88 12 7/12/2023 ALTAMI 9F9395 ALTAMIRA DR DAWN RIDGE PL GREENLEAF DR R - Residential/Local 11 2 O - AC/AC 492 36 17,712 82 0 92 8 7/12/2023 ALWOOD 5A5270 ALWOOD ST WILLOW AVE SIESTA AVE R - Residential/Local 4 2 A - AC 971 28 27,188 100 0 0 0 6/27/2023 ALWOOD 5A5275 ALWOOD ST MAYLAND AVE SIESTA AVE R - Residential/Local 4 2 O - AC/AC 325 34 11,050 100 0 0 0 6/27/2023 ALWOOD 5A5410 ALWOOD ST WILLOW AVE SUNKIST AVE R - Residential/Local 4 2 A - AC 1,070 33 35,310 100 0 0 0 6/27/2023 ALWOOD 6B7760 ALWOOD ST ST. MALO ST END OF STREET R - Residential/Local 5 2 O - AC/AC 227 28 6,356 74 20 80 0 7/5/2023 ALWOOD 6D8370 ALWOOD ST INDIAN SUMMER AVE VALINDA AVE R - Residential/Local 6 2 A - AC 1,069 28 29,932 40 46 54 1 6/29/2023 ALWOOD 6D8400 ALWOOD ST PRICEDALE AVE FRANDALE AVE R - Residential/Local 6 2 A - AC 676 35 23,660 48 52 48 0 6/29/2023 AMANDA 10G440 AMANDA ST - AMANDA SENTOUS AVE NOGALES ST R - Residential/Local 12 2 O - AC/AC 919 36 33,084 75 40 60 0 7/20/2023 AMANDA 10G445 AMANDA ST - AMANDA NOGALES ST END OF STREET R - Residential/Local 11 2 A - AC 640 36 23,040 70 0 78 22 7/13/2023 ANDALU 6G8022 ANDALUCIA DR LAS ROSAS DR END OF STREET R - Residential/Local 10 2 A - AC 555 28 15,540 86 0 100 0 7/26/2023 ANDREA 10G410 ANDREA CT ARLINE ST END OF STREET R - Residential/Local 11 2 O - AC/AC 240 29 6,960 79 8 50 41 7/14/2023 ANGELA 10F385 ANGELA ST ADRIENNE DR END OF STREET R - Residential/Local 11 2 O - AC/AC 540 28 15,120 84 0 58 42 7/14/2023 ANSON 8E9250 ANSON WY RODNEY RD WOLSEY LN R - Residential/Local 7 2 O - AC/AC 875 37 32,375 87 0 100 0 7/19/2023 APRIL 10F280 APRIL WAY GEMINI STREET END OF STREET R - Residential/Local 11 2 O - AC/AC 188 28 5,264 69 0 66 34 7/19/2023 ARDILL 3B1090 ARDILLA AVE HAVENBROOK ST MACDEVITT ST R - Residential/Local 1 2 A - AC 635 36 24,130 73 0 19 81 7/5/2023 ARDILL 3B1100 ARDILLA AVE MACDEVITT ST DUTCH ST R - Residential/Local 1 2 O - AC/AC 370 18 7,030 58 25 50 26 8/11/2023 ARDILL 3B1110 ARDILLA AVE CHANNING ST PACIFIC AVE R - Residential/Local 1 1 A - AC 1,215 16 23,085 40 36 55 9 8/11/2023 ARDILL 4A3400 ARDILLA AVE WALNUT CREEK PKWY END OF STREET R - Residential/Local 4 2 A - AC 1,471 38 55,898 100 0 0 0 8/7/2023 ARLINE 10F383 ARLINE ST 2403 ALICIA ST 2456 ALICIA ST R - Residential/Local 11 2 O - AC/AC 1,350 37 49,950 87 0 58 42 7/14/2023 ARMEL 3F3250 ARMEL DR EKERMAN AVE ROWLAND AVE R - Residential/Local 3 1 O - AC/AC 955 19 18,145 41 64 36 0 7/26/2023 AROMA 6F8650 AROMA DR WILDWOOD DONNA BETH AVE R - Residential/Local 10 2 O - AC/AC 512 38 19,456 58 25 74 1 8/9/2023 AROMA 6F8661 AROMA DR DONNA BETH AVE FAIRGROVE AVE R - Residential/Local 10 2 A - AC 530 38 20,140 68 11 89 0 8/9/2023 ART 9F9453 ART PL WOODGATE DR END OF STREET R - Residential/Local 11 2 A - AC 352 30 10,560 34 60 40 0 8/2/2023 ARTURO 4F4862 ARTURO ST CORTEZ ST RIO VERDE DR R - Residential/Local 8 2 A - AC 442 38 16,796 81 40 60 0 6/27/2023 ASHDAL 4E4140 ASHDALE ST STUART AVE END OF STREET R - Residential/Local 6 2 O - AC/AC 1,115 38 42,370 86 27 69 4 7/12/2023 ASHDAL 4E4150 ASHDALE ST WALNUT CREEK PKWY STUART AVE R - Residential/Local 6 2 A - AC 662 38 25,156 37 69 30 1 7/12/2023 ASHWOO 4D4070 ASHWOOD ST BANDY AVE WALNUT CREEK PKWY R - Residential/Local 6 2 O - AC/AC 802 30 24,060 74 51 49 0 7/12/2023 ASTELL 2D2010 ASTELL AVE PUENTE AVE LOUISA AVE R - Residential/Local 2 2 A - AC 500 30 15,000 82 28 72 0 6/29/2023 ASTELL 2D2030 ASTELL AVE GROVECENTER ST ELGENIA AVE R - Residential/Local 2 2 A - AC 280 38 10,640 73 6 94 0 6/29/2023 ASTELL 3D2410 ASTELL AVE WORKMAN AVE ROWLAND AVE R - Residential/Local 2 2 A - AC 1,285 38 48,830 95 0 100 0 6/29/2023 ASTELL 4D3920 ASTELL AVE SERVICE AVE END OF STREET R - Residential/Local 6 2 O - AC/AC 240 28 6,720 91 0 41 59 6/28/2023 ASTELL 4E4160 ASTELL AVE DALEWOOD ST STUART AVE R - Residential/Local 6 2 A - AC 697 38 26,486 79 13 86 1 7/12/2023 ASTELL 4E4165 ASTELL AVE S. GARVEY AVE DALEWOOD ST. R - Residential/Local 6 2 A - AC 455 38 17,290 71 30 68 2 7/12/2023 ASTELL 4E4170 ASTELL AVE STUART AVE WALNUT CREEK PKWY R - Residential/Local 6 2 A - AC 662 38 25,156 76 13 63 24 7/12/2023 ASTELL 5D6170 ASTELL AVE CAMERON AVE END OF STREET R - Residential/Local 6 2 A - AC 216 28 6,048 70 41 59 0 6/28/2023 ASTELL 5E6990 ASTELL AVE GREENVILLE DR END OF STREET R - Residential/Local 6 2 O - AC/AC 255 28 7,140 75 61 39 0 6/28/2023 AUBURN 5E6620 AUBURN DR GREENVILLE DR END OF STREET R - Residential/Local 7 2 O - AC/AC 250 30 7,500 90 0 100 0 6/26/2023 AUBURN 5E6690 AUBURN DR PORTNER ST END OF STREET R - Residential/Local 7 2 O - AC/AC 245 28 6,860 89 0 100 0 6/26/2023 AUBURN 6E8500 AUBURN DR MICHELLE ST END OF STREET R - Residential/Local 7 2 O - AC/AC 445 30 13,350 39 71 29 0 6/30/2023 AUDREY 10F387 AUDREY LN ADRIENNE DR ARLINE ST R - Residential/Local 11 2 O - AC/AC 162 36 5,832 92 0 56 44 7/14/2023 AUTUMN 7E7010 AUTUMN DR AZUSA AVE ALMANAC DR R - Residential/Local 7 2 O - AC/AC 680 26 17,680 92 34 66 0 7/19/2023 AUTUMN 7E7012 AUTUMN DR ALMANAC DR DOUBLEGROVE ST R - Residential/Local 7 2 A - AC 990 26 25,740 70 76 24 0 7/19/2023 AVINGT 4E4510 AVINGTON AVE SERVICE AVE END OF STREET R - Residential/Local 6 2 O - AC/AC 300 28 8,400 81 82 18 0 6/28/2023 AVINGT 4E4520 AVINGTON AVE LARKWOOD ST MOBECK ST R - Residential/Local 6 2 A - AC 292 30 8,760 40 73 27 0 6/28/2023 AVINGT 5E6970 AVINGTON AVE CAMERON AVE END OF STREET R - Residential/Local 6 2 A - AC 218 28 6,104 68 40 60 0 6/28/2023 AVINGT 5E6980 AVINGTON AVE GREENVILLE DR END OF STREET R - Residential/Local 6 2 O - AC/AC 245 28 6,860 88 0 100 0 6/28/2023 AVINGT 7E9130 AVINGTON AVE MAPLEGROVE ST END OF STREET R - Residential/Local 7 2 O - AC/AC 700 30 21,000 62 69 31 0 8/9/2023 BADILL 9ZA9021 BADILLO ST VINCENT AVE END OF PCC R - Residential/Local 0 2 P - PCC 318 34 10,812 68 8 32 60 8/15/2023 BAINBR 5B5680 BAINBRIDGE AVE SHADYDALE AVE END OF STREET R - Residential/Local 5 2 O - AC/AC 470 30 14,100 97 0 87 13 7/5/2023 BAINBR 6B7743 BAINBRIDGE AVE ST. MALO ST CALIFORNIA AVE R - Residential/Local 5 2 O - AC/AC 380 30 11,400 81 25 75 0 7/5/2023 BAINBR 6B7820 BAINBRIDGE AVE CALIFORNIA AVE BROADMOOR AVE R - Residential/Local 5 2 A - AC 1,056 37 39,072 96 0 100 0 8/4/2023 BALI 11H545 BALI DR POINT CEDAR DR END OF STREET R - Residential/Local 12 2 O - AC/AC 183 28 5,124 75 0 100 0 7/13/2023 BANDY 4D4110 BANDY ST DALEWOOD ST WALNUT CREEK PKWY R - Residential/Local 6 2 O - AC/AC 1,628 38 61,864 77 19 81 0 7/12/2023 BARBAR 4C3790 BARBARA AVE END OF STREET BRUCE AVE R - Residential/Local 5 2 O - AC/AC 481 29 13,949 84 69 31 0 6/28/2023 BARBAR 5C5730 BARBARA AVE CALIFORNIA AVE DUFF AVE R - Residential/Local 5 2 A - AC 914 30 27,420 85 0 100 0 6/28/2023 BARBAR 5C5870 BARBARA AVE END OF STREET EVANWOOD AVE R - Residential/Local 5 2 O - AC/AC 470 30 14,100 95 0 100 0 6/26/2023 BARBAR 5D6510 BARBARA AVE VALINDA AVE HOLLY PL R - Residential/Local 6 2 O - AC/AC 1,254 32 40,128 67 47 50 3 6/29/2023 BARBAR 5D6515 BARBARA AVE GLENDORA AVE HOLLY PL R - Residential/Local 6 2 A - AC 1,286 32 41,152 45 57 38 4 6/29/2023 BARHAM 8E9243 BARHAM AVE RODNEY RD END OF STREET R - Residential/Local 7 2 O - AC/AC 556 36 20,016 99 0 100 0 7/19/2023 BAUER 7D8990 BAUER DR MEADOW SIDE ST FORD DR R - Residential/Local 7 2 A - AC 265 28 7,420 77 0 36 64 8/10/2023 BAYMAR 3F3170 BAYMAR DR NORTH GARVEY AVE IDAHOME ST R - Residential/Local 3 2 O - AC/AC 800 38 30,400 79 19 79 2 7/19/2023 BAYMAR 4F4750 BAYMAR ST WALNUT CREEK PKWY S GARVEY AVE R - Residential/Local 8 2 O - AC/AC 1,150 38 43,700 78 19 81 0 7/20/2023 BELIND 10F393 BELINDA ST ADRIENNE DR BRENDA ST R - Residential/Local 11 2 O - AC/AC 651 36 23,436 70 30 46 23 7/14/2023 BELMON 6B7815 BELMONT AVE BROADMOOR AVE BAINBRIDGE AVE R - Residential/Local 5 2 A - AC 1,355 38 51,490 92 0 100 0 8/4/2023
City of West Covina, CA
Pavement Condition Index (PCI) Report - All Streets
Sorted by Rank, Name Order (A-Z)
BENCOL 5D6540 BENCOLA CT VINE AVE END OF STREET R - Residential/Local 6 2 O - AC/AC 232 28 6,496 86 0 100 0 6/29/2023 BENTLE 7F8630 BENTLEY ST HILLSIDE DR END OF STREET R - Residential/Local 10 2 A - AC 1,251 28 35,028 92 0 97 3 8/10/2023 BERGLU 7D9020 BERGLUND DR FORD DR MEADOWSIDE ST R - Residential/Local 7 2 A - AC 548 28 15,344 76 0 26 74 8/10/2023 BERNAD 10G460 BERNADETTE ST AMANDA ST END OF STREET R - Residential/Local 11 2 O - AC/AC 774 36 27,864 72 16 68 17 7/13/2023 BETSY 9F9447 BETSY ST ADRIENNE DR END OF STREET R - Residential/Local 11 2 O - AC/AC 393 28 11,004 78 0 76 24 7/14/2023 BIXBY 3D2186 BIXBY AVE SHAMWOOD ST WORKMAN AVE R - Residential/Local 2 2 O - AC/AC 591 30 17,730 83 3 79 18 7/21/2023 BLUEAS 4D4020 BLUE ASH RD CALIFORNIA AVE END OF STREET R - Residential/Local 5 2 O - AC/AC 800 30 24,000 53 75 24 1 6/28/2023 BLUE 5D6090 BLUE DR GRETTA AVE BLUE DR R - Residential/Local 6 2 O - AC/AC 795 32 25,440 89 0 100 0 6/28/2023 BLUE 5D6100 BLUE DR BLUE DR THACKERY ST R - Residential/Local 6 2 O - AC/AC 275 30 8,250 80 37 63 0 6/28/2023 BRADBU 6B7870 BRADBURY ST BROADMOOR AVE RADWAY AVE R - Residential/Local 5 2 O - AC/AC 333 30 9,990 86 27 73 0 6/30/2023 BRENDA 9F9456 BRENDA ST BELINDA ST ADRIENNE DR R - Residential/Local 11 2 O - AC/AC 456 36 16,416 64 35 43 23 7/14/2023 BRENTW 7E9090 BRENTWOOD DR ALLEY WY END OF STREET R - Residential/Local 7 2 O - AC/AC 945 36 34,020 96 0 0 100 7/19/2023 BRENTW 7E9092 BRENTWOOD DR AMAR RD ALLEY WY R - Residential/Local 7 2 A - AC 576 36 20,736 77 28 49 23 7/19/2023 BROADM 2C1290 BROADMOOR AVE N. CITY BOUNDARY PUENTE AVE R - Residential/Local 1 2 O - AC/AC 750 38 28,500 88 0 77 23 7/14/2023 BROADM 3C1810 BROADMOOR AVE WORKMAN AVE END OF STREET R - Residential/Local 1 2 A - AC 627 30 18,810 73 66 34 0 7/14/2023 BROADM 3C1820 BROADMOOR AVE ROWLAND AVE WORKMAN AVE R - Residential/Local 1 2 A - AC 1,267 30 38,010 65 65 35 0 7/14/2023 BROADM 3C1830 BROADMOOR AVE CARLTON AVE ROWLAND AVE R - Residential/Local 1 2 O - AC/AC 750 30 22,500 75 36 45 19 7/14/2023 BROADM 4C3700 BROADMOOR AVE MARIANA ST MARGARITA DR R - Residential/Local 5 2 A - AC 248 30 7,440 84 36 64 0 6/27/2023 BROADM 4C3710 BROADMOOR AVE SERVICE AVE END OF STREET R - Residential/Local 5 2 A - AC 441 30 13,230 85 19 81 0 6/28/2023 BROADM 5B5600 BROADMOOR AVE DURNESS ST ITUNI ST R - Residential/Local 5 2 A - AC 294 38 11,172 100 0 0 0 6/26/2023 BROADM 5B5605 BROADMOOR AVE ITUNI ST END OF STREET R - Residential/Local 5 2 O - AC/AC 468 30 14,040 94 0 100 0 6/26/2023 BROADM 5C5960 BROADMOOR AVE DEVERS ST VINE AVE R - Residential/Local 5 2 O - AC/AC 720 30 21,600 81 23 77 0 6/28/2023 BROADM 5C5970 BROADMOOR AVE VINE AVE ROBINDALE ST R - Residential/Local 5 2 O - AC/AC 318 30 9,540 90 0 100 0 6/28/2023 BROADM 6B7880 BROADMOOR AVE WINDSOR ST FAIRGROVE AVE R - Residential/Local 5 2 O - AC/AC 1,500 38 57,000 84 48 52 0 6/27/2023 BROADM 6B7940 BROADMOOR AVE FRANCISQUITO AVE REXWOOD ST R - Residential/Local 5 2 O - AC/AC 2,110 38 80,180 73 62 31 7 6/28/2023 BROMLE 3B1250 BROMLEY AVE PACIFIC AVE CLYDEWOOD AVE R - Residential/Local 1 2 O - AC/AC 835 30 25,050 40 74 26 0 7/3/2023 BROMLE 3B1260 BROMLEY AVE WILLOW AVE PACIFIC AVE R - Residential/Local 1 2 O - AC/AC 630 28 17,640 79 62 38 0 7/3/2023 BROMLE 4A3310 BROMLEY AVE ITUNI STREET WALNUT CREEK PKWY R - Residential/Local 4 2 O - AC/AC 600 38 22,800 100 0 0 0 8/7/2023 BROMLE 4A3390 BROMLEY AVE END OF STREET ITUNI ST R - Residential/Local 4 2 O - AC/AC 260 30 7,800 100 0 0 0 8/7/2023 BROOKF 9E9335 BROOKFIELD PL WOODGATE DR END OF STREET R - Residential/Local 11 2 O - AC/AC 1,150 36 41,400 67 23 73 4 7/14/2023 BROOKT 7E7120 BROOKTREE CIRCLE EVENINGSIDE DR END OF STREET R - Residential/Local 7 2 A - AC 395 32 12,640 76 18 82 0 7/19/2023 BROOKT 7E7122 BROOKTREE CIRCLE EVENINGSIDE DR END OF STREET R - Residential/Local 7 2 A - AC 345 32 11,040 77 9 60 31 7/19/2023 BRUCE 4C3890 BRUCE AVE ROSEWAY ST CRUMLEY ST R - Residential/Local 5 2 O - AC/AC 559 38 21,242 91 22 78 0 6/28/2023 BRUCE 5C5990 BRUCE AVE VINE AVE ROBINDALE ST R - Residential/Local 5 2 O - AC/AC 240 30 7,200 81 21 79 0 6/28/2023 BRYNWO 9F9415 BRYNWOOD PL GREENLEAF DR END OF STREET R - Residential/Local 11 2 O - AC/AC 256 28 7,168 82 0 58 42 7/12/2023 BUBBLI 5C6060 BUBBLING WELL RD TRUMAN PL VINE AVE R - Residential/Local 6 2 A - AC 779 28 21,812 37 82 18 0 6/29/2023 BUBBLI 6C8110 BUBBLING WELL RD MERCED AVE MICHELLE ST. R - Residential/Local 6 2 A - AC 466 38 17,708 54 59 41 0 6/30/2023 BUCKBO 4I2001 BUCKBOARD CIR SOUTH GARVEY AVE END OF STREET R - Residential/Local 9 2 A - AC 163 28 4,564 57 57 43 0 8/8/2023 BURWOO 3D2310 BURWOOD AVE WORKMAN AVE END OF STREET R - Residential/Local 2 2 A - AC 273 28 7,644 77 15 85 0 8/7/2023 BUTTER 2E2700 BUTTERFIELD RD PUENTE AVE END OF STREET R - Residential/Local 2 2 A - AC 586 30 17,580 74 15 85 0 8/3/2023 BUTTER 2E2720 BUTTERFIELD RD PIONEER DR PUENTE AVE R - Residential/Local 2 2 O - AC/AC 962 38 36,556 74 40 31 29 7/14/2023 BUTTER 4E4310 BUTTERFIELD RD NORMA AVE STUART AVE R - Residential/Local 7 2 A - AC 480 30 14,400 68 57 43 0 7/12/2023 BUTTER 4E4320 BUTTERFIELD RD NORMA AVE END OF STREET R - Residential/Local 7 2 A - AC 560 30 16,800 80 29 69 2 8/7/2023 BUTTER 6E8420 BUTTERFIELD RD MERCED AVE MCWOOD ST R - Residential/Local 7 2 O - AC/AC 806 30 24,180 93 0 100 0 6/26/2023 CABANA 5B5520 CABANA AVE DELHAVEN ST GLENMERE ST R - Residential/Local 4 2 A - AC 608 30 18,240 100 0 0 0 6/30/2023 CABANA 6A3330 CABANA AVE FAIRGROVE AVE JOYCEDALE ST R - Residential/Local 4 2 O - AC/AC 258 36 9,288 78 18 82 0 6/30/2023 CABANA 6B7960 CABANA AVE DELVALE ST FRANCISQUITO AVE R - Residential/Local 4 2 O - AC/AC 1,043 36 37,548 76 29 63 8 7/5/2023 CAJON 4E4410 CAJON AVE LARKWOOD ST END OF STREET R - Residential/Local 8 2 A - AC 251 30 7,530 69 38 62 0 7/3/2023 CAJON 5E6740 CAJON AVE GREENVILLE DR END OF STREET R - Residential/Local 8 2 O - AC/AC 210 28 5,880 74 69 31 0 6/26/2023 CAJON 5E6780 CAJON AVE VINE AVE LINDA VISTA ST R - Residential/Local 8 2 O - AC/AC 477 30 14,310 88 26 69 5 6/26/2023 CAJON 5E6935 CAJON AVE ALASKA AVE END OF STREET R - Residential/Local 8 2 A - AC 314 30 9,420 50 46 54 0 6/26/2023 CAJON 5E6940 CAJON AVE CAMERON AVE END OF STREET R - Residential/Local 8 2 A - AC 522 30 15,660 30 69 28 4 7/3/2023 CAJON 5E6950 CAJON AVE CAMERON AVE END OF STREET R - Residential/Local 8 2 A - AC 180 28 5,040 60 72 28 0 7/3/2023 CAJON 6E8700 CAJON AVE CAJON CIRCLE MICHELLE ST R - Residential/Local 10 2 A - AC 421 30 12,630 50 47 53 0 6/30/2023 CAJON 6E8690 CAJON CIRCLE CAJON AVE END OF STREET R - Residential/Local 10 2 A - AC 222 30 6,660 46 54 46 0 6/30/2023 CALLEB 11H550 CALLE BAJA AVE FORECASTLE AVE (WB ONLY) CITY BOUNDARY (WB ONLY) R - Residential/Local 12 2 O - AC/AC 1,641 18 29,538 39 84 16 0 7/13/2023 CALVAD 4F4620 CALVADOS AVE NORMA AVE S GARVEY AVE R - Residential/Local 8 2 O - AC/AC 360 30 10,800 59 61 39 0 7/13/2023 CALVAD 4F4630 CALVADOS AVE WALNUT CREEK PKWY NORMA AVE R - Residential/Local 8 2 O - AC/AC 305 38 11,590 78 51 46 3 7/13/2023 CAMBRI 6E8570 CAMBRIDGE CT DOUBLEGROVE ST END OF STREET R - Residential/Local 7 2 O - AC/AC 448 28 12,544 99 0 100 0 7/19/2023 CAMEOV 6F8740 CAMEO VISTA DR SOUTH HILLS DR HILLWARD AVE R - Residential/Local 10 2 A - AC 1,450 38 55,100 91 75 25 0 6/30/2023 CAMILA 4C3750 CAMILA RD GREENBERRY DR EVANWOOD AVE R - Residential/Local 5 2 A - AC 532 28 14,896 100 0 0 0 6/26/2023 CAMILA 4C3800 CAMILA RD CARMENCITA DR END OF STREET R - Residential/Local 5 2 O - AC/AC 550 30 16,500 94 0 100 0 6/27/2023 CAMINO 10H474 CAMINO DE GLORIA CALLE BAJA MILLRIDGE DR R - Residential/Local 12 2 O - AC/AC 223 36 8,028 92 0 100 0 7/13/2023 CAMINO 11H551 CAMINO DE ROSA POINT CEDAR DR CITY BOUNDARY R - Residential/Local 12 2 A - AC 107 36 3,852 94 0 100 0 7/13/2023 CAMINO 10H470 CAMINO DE TEODORO MILLRIDGE DR HILLTONIA DR R - Residential/Local 12 2 A - AC 298 28 8,344 100 0 0 0 7/13/2023 CAMPAN 4H5170 CAMPANA FLORES DR CORTEZ ST CORTEZ ST R - Residential/Local 9 2 O - AC/AC 980 24 23,520 88 73 27 0 7/26/2023 CAMPER 6E8520 CAMPER DR MAPLEGROVE ST END OF STREET R - Residential/Local 7 2 O - AC/AC 235 26 6,110 82 0 100 0 8/9/2023 CARLTO 2C1300 CARLTON AVE SUNSET AVE ELLEN DR R - Residential/Local 1 2 O - AC/AC 1,300 30 39,000 85 0 100 0 7/26/2023 CARLTO 2D1860 CARLTON AVE MAPLEWOOD AVE OSBORN AVE R - Residential/Local 2 2 O - AC/AC 526 30 15,780 83 0 100 0 7/26/2023 CARLTO 2D1940 CARLTON AVE CARVOL AVE END OF STREET R - Residential/Local 2 2 O - AC/AC 245 30 7,350 71 28 69 3 7/26/2023 CARMEN 9F9420 CARMEN ST CECELIA ST CINDY ST R - Residential/Local 11 2 A - AC 331 36 11,916 75 34 53 13 7/12/2023 CARMEN 4C3810 CARMENCITA DR MARGARITA DR SERVICE AVE R - Residential/Local 5 2 O - AC/AC 575 30 17,250 89 12 88 0 6/27/2023 CARVOL 2D2070 CAROLINE ST PUENTE AVE END OF STREET R - Residential/Local 2 2 O - AC/AC 1,240 38 47,120 73 15 85 0 6/29/2023 CARVOL 2D2075 CAROLINE ST CARLTON AVE SWANEE LN R - Residential/Local 2 2 O - AC/AC 510 30 15,300 67 38 62 0 7/26/2023 CAROLI 2F3110 CAROLINE ST PUENTE AVE END OF STREET R - Residential/Local 3 2 O - AC/AC 582 30 17,460 78 12 88 0 7/14/2023 CARVOL 3D2400 CAROLINE ST VERNESS ST MARBURY ST R - Residential/Local 2 2 O - AC/AC 735 30 22,050 72 43 57 0 7/21/2023 CASAGR 6F8720 CASA GRANDE DR MICHELLE ST SOUTH HILLS DR R - Residential/Local 10 2 A - AC 750 38 28,500 61 75 25 0 6/30/2023
City of West Covina, CA
Pavement Condition Index (PCI) Report - All Streets
Sorted by Rank, Name Order (A-Z)
CASAGR 6F8721 CASA GRANDE DR SOUTH HILLS DR HOLLENCREST DR R - Residential/Local 10 2 A - AC 221 38 8,398 79 42 56 2 6/30/2023 CASALI 6F8760 CASA LINDA DR HILLWARD AVE SOUTH HILLS DR R - Residential/Local 10 2 A - AC 906 30 27,180 68 67 33 0 6/30/2023 CASALI 6F8785 CASA LINDA DR HOLLENCREST DR HIDDEN VALLEY DR R - Residential/Local 10 2 A - AC 260 30 7,800 73 71 29 0 7/21/2023 CASAD 3C1730 CASAD AVE WEST END OF STREET EAST END OF STREET R - Residential/Local 1 2 O - AC/AC 545 34 18,530 57 58 42 0 8/11/2023 CASAD 3C1841 CASAD AVE VINCENT AVE END OF STREET R - Residential/Local 1 2 A - AC 256 30 7,680 59 34 65 2 8/4/2023 CASAD 3D2230 CASAD AVE MAPLEWOOD AVE END OF STREET R - Residential/Local 2 2 A - AC 286 26 7,436 62 25 75 0 7/26/2023 CASAD 3D2490 CASAD AVE CARVOL AVE END OF STREET R - Residential/Local 2 2 O - AC/AC 204 26 5,304 46 65 35 0 7/26/2023 CASTLE 7F8610 CASTLE ROCK CT HILLSIDE DR END OF STREET R - Residential/Local 10 2 A - AC 400 28 11,200 79 0 87 13 7/20/2023 CECELI 9F9427 CECELIA ST CARMEN ST CINDY ST R - Residential/Local 11 2 A - AC 870 36 31,320 61 50 30 20 7/12/2023 CEDARB 4D4090 CEDARBROOK ST ASHWOOD ST PIMA AVE R - Residential/Local 6 2 O - AC/AC 545 30 16,350 80 38 62 0 7/12/2023 CEDARW 3B1060 CEDARWOOD ST ARDILLA AVE PUENTE AVE R - Residential/Local 1 2 A - AC 900 34 34,200 57 12 54 34 7/5/2023 CEDARW 3B1070 CEDARWOOD ST HAVENBROOK ST ARDILLA AVE R - Residential/Local 1 2 A - AC 528 38 20,064 59 27 27 46 7/5/2023 CHALBU 2C1320 CHALBURN AVE SWANEE LN PUENTE AVE R - Residential/Local 1 2 A - AC 1,215 30 36,450 49 67 33 0 7/3/2023 CHALBU 3C1450 CHALBURN AVE PACIFIC LN WORKMAN AVE R - Residential/Local 1 2 A - AC 675 28 18,900 80 61 35 4 7/3/2023 CHALBU 3C1505 CHALBURN AVE PADRE DR END OF STREET R - Residential/Local 1 2 A - AC 210 30 6,300 45 42 58 0 7/3/2023 CHANCE 10G437 CHANCE ST SHAKESPEARE DR GEHRIG ST R - Residential/Local 11 2 A - AC 338 36 12,168 86 0 72 28 7/19/2023 CHANNI 3B1170 CHANNING ST WILLOW AVE ARDILLA AVE R - Residential/Local 1 2 A - AC 951 34 36,138 86 0 51 49 7/3/2023 CHAPMA 2D1880 CHAPMAN ST ROWLAND AVE PUENTE AVE R - Residential/Local 1 2 O - AC/AC 1,300 38 49,400 53 64 36 0 7/26/2023 CHAPMA 3D2450 CHAPMAN ST GREENDALE ST ROWLAND AVE R - Residential/Local 1 2 A - AC 750 38 28,500 76 46 54 0 7/21/2023 CHARLI 5G7510 CHARLINDA AVE CAMERON AVE CITRUS ST R - Residential/Local 9 2 O - AC/AC 1,045 30 31,350 85 0 100 0 7/3/2023 CHARLI 5D6260 CHARLINDA ST VALINDA AVE GRETTA AVE R - Residential/Local 6 2 A - AC 962 30 28,860 43 52 48 0 6/28/2023 CHARLI 5E6850 CHARLINDA ST FERNWOOD ST FLEETWELL AVE R - Residential/Local 7 2 O - AC/AC 705 37 26,085 69 61 39 0 6/28/2023 CHARLI 5G7480 CHARLINDA ST BARRANCA ST LA SERENA DR R - Residential/Local 9 2 A - AC 480 28 13,440 71 88 12 0 8/8/2023 CHARLI 5H7640 CHARLINDA ST FORESTDALE AVE END OF STREET R - Residential/Local 9 2 A - AC 410 30 12,300 98 0 100 0 7/26/2023 CHARLI 5H7680 CHARLINDA ST WHITEBIRCH DR TRONA AVE R - Residential/Local 9 2 O - AC/AC 340 30 10,200 100 0 0 0 7/26/2023 CHARVE 4H5180 CHARVERS AVE CORTEZ ST WHITEBIRCH DR R - Residential/Local 9 2 O - AC/AC 580 30 17,400 58 41 57 1 7/26/2023 CHARVE 4H5220 CHARVERS AVE VIRGINIA AVE CORTEZ ST R - Residential/Local 9 2 O - AC/AC 1,519 35 53,165 53 61 38 1 7/26/2023 CHASE 7D8970 CHASE WY WEST END OF STREET EAST END OF STREET R - Residential/Local 7 2 O - AC/AC 386 28 10,808 72 0 64 36 8/10/2023 CHERRY 4E4240 CHERRYWOOD ST WALNUT CREEK PKWY HOLLY OAK DR R - Residential/Local 7 2 A - AC 920 38 34,960 79 48 52 0 7/13/2023 CHERRY 4E4250 CHERRYWOOD ST STUART AVE SOUTH GARVEY AVE (S) R - Residential/Local 7 2 A - AC 490 37 18,130 83 0 100 0 7/12/2023 CHERRY 4E4252 CHERRYWOOD ST SOUTH GARVEY AVE (S) JAMES AVE R - Residential/Local 7 2 A - AC 455 37 16,835 84 19 57 23 7/12/2023 CHERRY 4E4255 CHERRYWOOD ST JAMES AVE SOUTH GARVEY AVE (N) R - Residential/Local 7 2 A - AC 145 38 5,510 79 26 74 0 8/7/2023 CHETNE 3C1720 CHETNEY DR ORANGE AVE CONLON AVE R - Residential/Local 1 2 A - AC 824 30 24,720 62 34 66 0 7/14/2023 CHRIST 9F9423 CHRISTIE LN WOODGATE DR CARMEN ST R - Residential/Local 11 2 A - AC 115 36 4,140 79 57 43 0 7/12/2023 CHRIST 4D4010 CHRISTOPHER ST SANDY HOOK ST GLENDORA AVE R - Residential/Local 5 2 O - AC/AC 670 38 25,460 85 20 77 3 6/28/2023 CINDY 9F9425 CINDY ST CECELIA ST CARMEN ST R - Residential/Local 11 2 A - AC 662 36 23,832 72 30 53 17 7/12/2023 CLYDEW 3B1240 CLYDEWOOD AVE BROMLEY AVE ARDILLA AVE R - Residential/Local 1 2 O - AC/AC 630 38 23,940 81 40 60 0 7/3/2023 CONLON 2C1360 CONLON AVE PUENTE AVE LOUISA AVE R - Residential/Local 1 2 A - AC 700 38 26,600 89 0 100 0 6/29/2023 CONLON 3C1510 CONLON AVE WORKMAN AVE ELDRED AVE R - Residential/Local 1 2 O - AC/AC 1,975 30 59,250 76 65 35 0 7/14/2023 CONLON 3C1680 CONLON AVE HARBERT ST WORKMAN AVE R - Residential/Local 1 2 A - AC 796 26 20,696 58 55 45 0 7/14/2023 CONLON 5B5500 CONLON AVE FRANCISQUITO AVE GLENMERE ST R - Residential/Local 4 2 O - AC/AC 1,040 36 37,440 100 0 0 0 6/26/2023 CONLON 5B5670 CONLON AVE GLENMERE ST DURNESS ST R - Residential/Local 4 2 O - AC/AC 1,340 38 50,920 55 74 26 0 6/26/2023 CONLON 6A3350 CONLON AVE FRANCISQUITO AVE DELVALE ST R - Residential/Local 4 2 O - AC/AC 1,094 39 42,666 100 0 0 0 6/30/2023 CONLON 6A3355 CONLON AVE FAIRGROVE AVE NOLANDALE ST R - Residential/Local 4 2 O - AC/AC 813 38 30,894 67 57 43 0 7/5/2023 CORAK 5A5280 CORAK ST WILLOW AVE SIESTA AVE R - Residential/Local 4 2 O - AC/AC 1,041 28 29,148 94 5 90 5 6/27/2023 CORAK 5A5400 CORAK ST RAMA DR END OF STREET R - Residential/Local 4 2 A - AC 562 26 14,612 97 0 100 0 6/30/2023 CORALT 5F7075 CORAL TREE DR CAMERON AVE END OF STREET R - Residential/Local 8 2 A - AC 200 30 6,000 70 69 31 0 7/3/2023 CORALT 5F7070 CORALTREE DR CAMERON AVE THACKERY ST R - Residential/Local 8 2 A - AC 980 30 29,400 44 48 52 0 7/3/2023 CORDOV 5H7520 CORDOVA CT LAS ROSAS DR END OF STREET R - Residential/Local 10 2 A - AC 760 28 21,280 63 0 100 0 7/26/2023 CORONA 5D6995 CORONADO AVE GREENVILLE DR END OF STREET R - Residential/Local 6 2 O - AC/AC 258 28 7,224 53 64 34 2 6/28/2023 COUNTR 6F8686 COUNTRYWOOD LN SANDY HILL DR HIDDEN VALLEY DR R - Residential/Local 10 2 A - AC 1,680 28 47,040 71 0 39 61 7/21/2023 COURTN 9E9334 COURTNAY CIR WOODGATE DR END OF STREET R - Residential/Local 11 2 A - AC 140 28 3,920 67 0 48 52 7/14/2023 CRAIG 5D6400 CRAIG DR VINE AVE END OF STREET R - Residential/Local 6 2 A - AC 227 28 6,356 64 54 46 0 6/29/2023 CRAIG 5D6460 CRAIG DR VINE AVE MERCED AVE R - Residential/Local 6 2 A - AC 1,261 38 47,918 55 50 50 0 6/29/2023 CRAIG 5D6590 CRAIG DR HERRING AVE END OF STREET R - Residential/Local 6 2 A - AC 213 30 6,390 53 62 38 0 6/29/2023 CRAIG 5D6600 CRAIG DR CAMERON AVE HOLLY PL R - Residential/Local 6 2 O - AC/AC 635 30 19,050 70 0 100 0 6/29/2023 CRAIG 6D8340 CRAIG DR FRANCISQUITO AVE ALWOOD ST R - Residential/Local 6 2 A - AC 466 36 16,776 50 69 31 0 6/29/2023 CRAIGL 3H3292 CRAIGLEE CIR MIRIAM DR END OF STREET R - Residential/Local 3 2 O - AC/AC 115 30 3,450 73 50 50 0 8/8/2023 CRAVAT 10F365 CRAVATH CT TUESDAY DR END OF STREET R - Residential/Local 11 2 A - AC 622 28 17,416 63 0 71 29 7/19/2023 CRESCE 6F8685 CRESCENT VIEW DR SANDY HILLS DR END OF STREET R - Residential/Local 10 2 A - AC 590 26 15,340 74 0 100 0 7/21/2023 CRUMLE 4C3850 CRUMLEY ST BRUCE AVE EAST END OF STREET R - Residential/Local 5 2 O - AC/AC 528 30 15,840 83 70 30 0 6/28/2023 CRUMLE 4C3860 CRUMLEY ST BRUCE AVE WEST END OF STREET R - Residential/Local 5 2 O - AC/AC 186 29 5,394 86 0 100 0 6/28/2023 CRUMLE 5C5720 CRUMLEY ST DUFF AVE CALIFORNIA AVE R - Residential/Local 5 2 A - AC 898 28 25,144 88 25 75 0 6/28/2023 CRUMLE 5C5885 CRUMLEY ST EVANWOOD AVE GREENBERRY DR R - Residential/Local 5 2 O - AC/AC 496 30 14,880 64 58 42 0 6/26/2023 CUMBER 7E9080 CUMBERLAND DR RENOWN TER NELSON ST R - Residential/Local 7 2 O - AC/AC 1,520 36 54,720 98 0 0 100 7/14/2023 CYNTHI 10G443 CYNTHIA CT AMANDA ST END OF STREET R - Residential/Local 11 2 O - AC/AC 411 28 11,508 90 0 57 43 7/13/2023 DALEWO 4D4060 DALEWOOD ST GARDEN GLEN AVE GLENDORA AVE R - Residential/Local 6 2 O - AC/AC 322 38 12,236 67 49 51 0 7/12/2023 DALEWO 4D4065 DALEWOOD ST GARDEN GLEN ST ASHDALE ST R - Residential/Local 6 2 O - AC/AC 520 36 18,720 78 29 71 0 7/12/2023 DANCOV 4F4660 DANCOVE DR CORTEZ ST RIO VERDE DR R - Residential/Local 8 2 A - AC 1,070 38 40,660 72 26 74 0 6/27/2023 DANCOV 5F7080 DANCOVE DR MONTEZUMA WY MONTEZUMA WY R - Residential/Local 10 2 A - AC 990 28 27,720 75 66 34 0 7/21/2023 DANCOV 5F7200 DANCOVE DR CAMERON AVE END OF STREET R - Residential/Local 8 2 A - AC 756 30 22,680 58 36 56 8 7/3/2023 DANES 2E2610 DANES DR END OF STREET PHILLIPS AVE R - Residential/Local 3 2 O - AC/AC 446 38 16,948 75 34 65 1 7/26/2023 DANES 2E2730 DANES DR LARK ELLEN AVE BUTTERFIELD RD R - Residential/Local 2 2 O - AC/AC 807 38 30,666 85 0 100 0 7/14/2023 DANESD 9ZA9018 DANES DR AZUSA AVE END OF STREET R - Residential/Local 3 2 A - AC 139 36 5,004 67 15 85 0 8/11/2023 DANIEL 5F7290 DANIELS AVE HILLWARD AVE HOLLENBECK ST R - Residential/Local 8 2 O - AC/AC 1,140 30 34,200 71 56 44 0 7/3/2023 DAWLEY 4D3950 DAWLEY AVE SERVICE AVE END OF STREET R - Residential/Local 6 2 O - AC/AC 205 30 6,150 63 44 56 0 6/28/2023 DAWLEY 5D6270 DAWLEY AVE CAMERON AVE MOBECK ST R - Residential/Local 6 2 A - AC 650 38 24,700 56 47 49 4 6/28/2023
City of West Covina, CA
Pavement Condition Index (PCI) Report - All Streets
Sorted by Rank, Name Order (A-Z)
DAWLEY 5D6275 DAWLEY AVE LARKWOOD AVE MOBECK ST R - Residential/Local 6 2 A - AC 191 33 6,303 79 39 51 10 6/28/2023 DAWNRI 9E9345 DAWN RIDGE PL ALTAMIRA DR END OF STREET R - Residential/Local 11 2 O - AC/AC 332 28 9,296 77 0 98 2 7/12/2023 DEE 9F9437 DEE LN WOODGATE DR END OF STREET R - Residential/Local 11 2 A - AC 302 36 10,872 81 0 59 41 7/12/2023 DELCER 5F7310 DEL CERRO AVE LOLITA ST DEL CERRO DR R - Residential/Local 8 2 O - AC/AC 320 30 9,600 81 30 70 0 6/30/2023 DELCER 5E6900 DEL CERRO DR DEL CERRO AVE END OF STREET R - Residential/Local 8 2 A - AC 500 30 15,000 65 54 46 0 6/30/2023 DELNOR 3C1560 DEL NORTE ST NORA AVE HOLLOW AVE R - Residential/Local 1 2 O - AC/AC 792 38 30,096 93 0 100 0 6/29/2023 DELHAV 6B7830 DELHAVEN AVE CALIFORNIA AVE BROADMOOR AVE R - Residential/Local 5 2 O - AC/AC 992 38 37,696 81 61 39 0 7/5/2023 DELHAV 5B5460 DELHAVEN ST ORANGE AVE CONLON AVE R - Residential/Local 4 2 A - AC 774 38 29,412 100 0 0 0 6/30/2023 DELHAV 5B5540 DELHAVEN ST CABANA AVE TONOPAH AVE R - Residential/Local 4 2 A - AC 570 30 17,100 100 0 0 0 6/30/2023 DELIA 9ZA9000 DELIA PL WOODGATE DR END OF STREET R - Residential/Local 11 2 A - AC 724 32 23,168 66 25 75 0 8/10/2023 DELORE 9F9440 DELORES ST DEE LN ELENA AVE R - Residential/Local 11 2 O - AC/AC 817 36 29,412 77 0 82 18 7/12/2023 DELVAL 6A3360 DELVALE ST SUNSET AVE TONOPAH AVE R - Residential/Local 4 2 O - AC/AC 900 34 30,600 100 0 0 0 6/30/2023 DELVAL 6A3370 DELVALE ST ORANGE AVE TONOPAH AVE R - Residential/Local 4 2 O - AC/AC 925 38 35,150 100 0 0 0 6/30/2023 DELVAL 6B7910 DELVALE ST SHADYDALE AVE BROADMOOR AVE R - Residential/Local 5 2 O - AC/AC 644 38 24,472 84 43 57 0 6/30/2023 DENNIS 3C1580 DENNIS PL ROBERTO AVE END OF STREET R - Residential/Local 1 2 O - AC/AC 188 30 5,640 69 32 53 14 7/21/2023 DEODAR 4F4700 DEODAR AVE HOLLENBECK ST END OF STREET R - Residential/Local 8 2 O - AC/AC 275 30 8,250 88 0 100 0 8/10/2023 DEODAR 4F4720 DEODAR AVE BAYMAR ST END OF STREET R - Residential/Local 8 2 O - AC/AC 470 28 13,160 69 54 46 0 7/20/2023 DEREK 7D8945 DEREK COURT EDENVIEW LN END OF STREET R - Residential/Local 7 2 A - AC 144 30 4,320 83 0 100 0 7/14/2023 DEVERS 4B3660 DEVERS ST VAN HORN AVE END OF STREET R - Residential/Local 4 2 A - AC 369 30 11,070 100 0 0 0 8/11/2023 DEVERS 5B5590 DEVERS ST SHADYDALE AVE END OF STREET R - Residential/Local 5 2 A - AC 408 30 12,240 76 10 36 55 6/28/2023 DEVERS 5C5950 DEVERS ST BROADMOOR AVE SHADYDALE AVE R - Residential/Local 5 2 O - AC/AC 247 30 7,410 93 0 100 0 6/28/2023 DIANE 7D8890 DIANE PL SCOTT RD KELLY WY R - Residential/Local 7 2 A - AC 354 33 11,682 86 0 79 21 8/9/2023 DONNAB 4E4420 DONNA BETH AVE LARKWOOD ST END OF STREET R - Residential/Local 8 2 A - AC 396 30 11,880 62 37 40 23 7/3/2023 DONNAB 5E6760 DONNA BETH AVE VINE AVE LINDA VISTA ST R - Residential/Local 8 2 O - AC/AC 477 30 14,310 93 0 100 0 6/26/2023 DONNAB 5E6860 DONNA BETH AVE CAMERON AVE END OF STREET R - Residential/Local 8 2 A - AC 180 28 5,040 70 66 34 0 7/3/2023 DONNAB 5E6910 DONNA BETH AVE CAMERON AVE END OF STREET R - Residential/Local 8 2 A - AC 517 28 14,476 37 57 43 0 7/3/2023 DONNAB 5E6930 DONNA BETH AVE VINE AVE ALASKA ST R - Residential/Local 8 2 O - AC/AC 573 30 17,190 78 21 59 21 6/26/2023 DONNAB 5F7150 DONNA BETH AVE GREENVILLE DR END OF STREET R - Residential/Local 8 2 O - AC/AC 210 28 5,880 88 14 86 0 6/26/2023 DONNAB 6F8665 DONNA BETH AVE AROMA DR CALICO ST (PRIVATE STREET) R - Residential/Local 10 2 O - AC/AC 615 38 23,370 58 40 32 28 8/9/2023 DONNAB 6F8680 DONNA BETH AVE HEATH TER MICHELLE ST R - Residential/Local 10 2 A - AC 810 30 24,300 52 43 52 5 6/30/2023 DONNAB 7F9231 DONNA BETH AVE AROMA DR CALICO ST R - Residential/Local 10 2 O - AC/AC 1,345 38 51,110 81 27 70 4 8/9/2023 DORE 7D8875 DORE ST EDENVIEW LN END OF STREET R - Residential/Local 7 2 O - AC/AC 374 30 11,220 89 49 51 0 7/14/2023 DORE 8D9233 DORE ST GRAND VIEW LN VALINDA AVE R - Residential/Local 7 2 O - AC/AC 1,392 35 48,720 85 0 79 21 8/9/2023 DOROTH 9F9467 DOROTHY ST ELENA AVE END OF STREET R - Residential/Local 11 2 O - AC/AC 461 28 12,908 80 0 50 50 7/12/2023 DOUBLE 5A5290 DOUBLEGROVE ST SIESTA AVE WILLOW AVE R - Residential/Local 4 2 A - AC 1,041 28 29,148 100 0 0 0 6/27/2023 DOUBLE 5A5310 DOUBLEGROVE ST RAMA DR END OF STREET R - Residential/Local 4 2 A - AC 477 26 12,402 95 0 100 0 6/30/2023 DOUBLE 5A5350 DOUBLEGROVE ST ORANGE AVE SANDIA AVE R - Residential/Local 4 2 A - AC 294 34 9,996 77 29 71 0 6/30/2023 DOUBLE 6B7750 DOUBLEGROVE ST ST. MALO ST CITY BOUNDARY R - Residential/Local 5 2 O - AC/AC 185 28 5,180 72 21 79 0 7/5/2023 DOUBLE 6E8560 DOUBLEGROVE ST GRENOBLE AVE 1628 DOUBLEGROVE ST R - Residential/Local 7 2 O - AC/AC 1,030 36 37,080 89 0 100 0 7/19/2023 DOUBLE 6E8562 DOUBLEGROVE ST 1628 DOUBLEGROVE ST SEASON AVE R - Residential/Local 7 2 O - AC/AC 720 26 18,720 85 29 71 0 7/19/2023 DRYCRE 9ZA9001 DRYCREEK DR HOLT AVE SPRINGCREEK DR R - Residential/Local 9 2 A - AC 670 28 18,760 82 0 100 0 8/10/2023 DRYDEN 7D9035 DRYDEN LN HARRINGTON WY END OF STREET R - Residential/Local 7 2 A - AC 330 38 12,540 92 0 100 0 8/10/2023 DUFF 5C5770 DUFF AVE S\END - BARBARA END OF STREET R - Residential/Local 5 2 A - AC 687 28 19,236 90 36 64 0 6/28/2023 DUFF 6C8040 DUFF AVE LUCILLE AVE MICHELLE ST R - Residential/Local 5 2 A - AC 330 38 12,540 100 0 0 0 6/26/2023 DURNES 5B5100 DURNESS ST ORANGE AVE SUNKIST AVE R - Residential/Local 4 2 O - AC/AC 798 38 30,324 100 0 0 0 6/27/2023 DURNES 5B5560 DURNESS ST ORANGE AVE SUNSET AVE R - Residential/Local 4 2 O - AC/AC 2,055 38 78,090 56 74 23 3 6/26/2023 DURNES 5B5630 DURNESS ST SUNSET AVE CALIFORNIA AVE R - Residential/Local 5 2 A - AC 1,855 38 70,490 73 73 27 0 6/26/2023 DURNES 6C8080 DURNESS ST SANDY HOOK ST END OF STREET R - Residential/Local 5 2 O - AC/AC 538 30 16,140 84 27 73 0 6/26/2023 EASTHI 5H7660 EAST HILLS DR HILLSIDE DR CAMERON AVE R - Residential/Local 10 2 A - AC 2,575 30 77,250 65 28 64 7 7/21/2023 EASTHI 9ZA9033 EAST HILLS DR HILLSIDE DR END OF STREET R - Residential/Local 10 2 A - AC 1,168 28 32,704 65 62 38 0 8/11/2023 EASTNO 11G495 EASTNOR AVE FENMEAD ST HIGHCASTLE ST R - Residential/Local 12 2 O - AC/AC 229 32 7,328 93 0 100 0 7/20/2023 ECKERM 2D1950 ECKERMAN AVE TOLAND AVE END OF STREET R - Residential/Local 2 2 O - AC/AC 470 30 14,100 65 10 69 21 7/26/2023 ECKERM 2D1970 ECKERMAN AVE VINCENT AVE OSBORN AVE R - Residential/Local 2 2 O - AC/AC 835 30 25,050 84 7 89 4 7/26/2023 ECKERM 2E2640 ECKERMAN AVE HOMEREST AVE EILEEN AVE R - Residential/Local 2 2 O - AC/AC 300 38 11,400 71 60 40 0 7/14/2023 ECKERM 2E2740 ECKERMAN AVE BUTTERFIELD RD LEAF AVE R - Residential/Local 2 2 O - AC/AC 306 38 11,628 74 41 47 12 7/14/2023 ECKERM 2E2750 ECKERMAN AVE LARK ELLEN AVE END OF SREET R - Residential/Local 2 2 A - AC 553 30 16,590 60 26 59 15 7/27/2023 ECKERM 3C1850 ECKERMAN AVE ELLEN DR SUNSET AVE R - Residential/Local 1 2 O - AC/AC 1,300 30 39,000 57 56 15 29 7/26/2023 ECKERM 3E2970 ECKERMAN AVE CITY BOUNDARY (ARMEL DR) PHILLIPS AVE R - Residential/Local 3 2 A - AC 630 38 23,940 63 45 50 6 7/26/2023 ECKERM 3E2980 ECKERMAN AVE PHILLIPS AVE END OF STREET R - Residential/Local 3 2 O - AC/AC 446 38 16,948 74 54 46 0 7/26/2023 ECKERM 9ZA9020 ECKERMAN AVE AZUSA AVE END OF STREET R - Residential/Local 3 2 A - AC 149 36 5,364 68 0 100 0 8/11/2023 ECLIPS 7D8920 ECLIPSE WY LYNDA LN JENNIFER PL R - Residential/Local 7 2 A - AC 942 35 32,970 79 0 55 45 8/9/2023 EDDESS 5G7530 EDDES ST CITRUS ST MAGNOLIA AVE R - Residential/Local 8 2 A - AC 478 28 13,384 38 62 37 1 7/3/2023 EDDES 5G7580 EDDES ST LA SERENA DR END OF STREET R - Residential/Local 10 2 A - AC 623 28 17,444 60 63 37 0 7/26/2023 EDDES 5H7620 EDDES ST LA SERENA DR END OF STREET R - Residential/Local 10 2 A - AC 474 30 14,220 76 65 35 0 7/26/2023 EDENVI 7D8895 EDENVIEW LN MERRYL LN ADUL ST R - Residential/Local 7 2 A - AC 1,590 35 55,650 94 0 91 9 8/9/2023 EDIE 5F7330 EDIE ST HOLLENBECK ST END OF STREET R - Residential/Local 8 2 O - AC/AC 230 30 6,900 84 0 46 54 6/30/2023 EDITH 3C1770 EDITH ST ROWLAND AVE CASAD AVE R - Residential/Local 1 2 O - AC/AC 367 38 13,946 62 67 33 0 7/14/2023 EILEEN 2E2650 EILEEN AVE PUENTE AVE END OF STREET R - Residential/Local 2 2 O - AC/AC 698 38 26,524 72 1 66 33 8/3/2023 EILEEN 2E2680 EILEEN AVE LOUISA AVE END OF STREET R - Residential/Local 2 2 A - AC 167 28 4,676 65 7 93 0 8/3/2023 ELCAMI 11H519 EL CAMINO ESPLANADE FORECASTLE AVE CITY BOUNDARY R - Residential/Local 12 2 A - AC 142 36 5,112 42 38 62 0 7/13/2023 ELDER 4B3590 ELDER ST MEEKER AVE SUNKIST AVE R - Residential/Local 4 2 A - AC 452 34 15,368 100 0 0 0 8/11/2023 ELDER 4B3620 ELDER ST VAN HORN AVE SUNKIST AVE R - Residential/Local 4 2 A - AC 416 34 14,144 100 0 0 0 8/8/2023 ELDORA 2D1980 EL-DORADO ST VINCENT AVE CARVOL AVE R - Residential/Local 2 2 O - AC/AC 1,570 30 47,100 68 35 64 2 6/29/2023 ELDORA 2D2080 EL-DORADO ST GREENBERRY AVE END OF STREET R - Residential/Local 1 2 O - AC/AC 395 30 11,850 90 0 100 0 7/26/2023 ELDORA 3C1470 EL-DORADO ST LA SENA AVE END OF STREET R - Residential/Local 1 2 O - AC/AC 423 30 12,690 83 8 92 0 7/3/2023 ELDRED 2C1330 ELDRED AVE ORANGE AVE CONLON AVE R - Residential/Local 1 2 O - AC/AC 826 38 31,388 85 14 86 0 7/14/2023 ELDRED 2C1335 ELDRED AVE CONLON AVE NORA AVE R - Residential/Local 1 2 O - AC/AC 310 30 9,300 88 0 100 0 7/14/2023
City of West Covina, CA
Pavement Condition Index (PCI) Report - All Streets
Sorted by Rank, Name Order (A-Z)
ELENA 9F9443 ELENA AVE DOROTHY ST END OF STREET R - Residential/Local 11 2 A - AC 510 36 18,360 80 0 64 36 7/12/2023 ELENA 9F9463 ELENA AVE DOROTHY ST EVANGELINA ST R - Residential/Local 11 2 A - AC 955 36 34,380 82 0 47 53 7/12/2023 ELGENI 2D2040 ELGENIA AVE CARVOL AVE ASTELL AVE R - Residential/Local 2 2 A - AC 480 38 18,240 79 8 92 0 6/29/2023 ELGENI 2D2050 ELGENIA AVE VINCENT AVE CARVOL AVE R - Residential/Local 2 2 A - AC 1,534 30 46,020 75 12 72 16 6/29/2023 ELGENI 2C1430 ELGENIA ST NORA AVE YALETON AVE R - Residential/Local 1 2 O - AC/AC 585 30 17,550 84 0 100 0 6/29/2023 ELGENI 2D2060 ELGENIA ST CITY BOUNDARY (E/ GREENBERRY AVE) END OF STREET R - Residential/Local 1 2 A - AC 180 30 5,400 66 35 55 10 7/28/2023 ELLEN 2D2130 ELLEN DR LOUISA AVE END OF STREET R - Residential/Local 1 2 O - AC/AC 150 30 4,500 99 0 47 53 7/26/2023 ELLEN 2D2150 ELLEN DR CARLTON AVE ECKERMAN AVE R - Residential/Local 1 2 O - AC/AC 350 30 10,500 75 38 62 0 7/26/2023 ELLEN 3D2430 ELLEN DR NORTH GARVEY AVE WORKMAN AVE R - Residential/Local 1 2 O - AC/AC 986 38 37,460 60 63 37 0 7/13/2023 ELLEN 3D2530 ELLEN DR ROWLAND AVE WORKMAN AVE R - Residential/Local 1 2 O - AC/AC 1,265 38 48,070 65 52 47 1 7/21/2023 ELLESF 11G487 ELLESFORD AVE VALLEY VIEW AVE HOLLINGWORTH ST R - Residential/Local 12 2 A - AC 978 36 35,208 55 52 48 0 7/20/2023 EMERAL 4G4940 EMERALD AVE ROSE MARY DR SUNSET HILL DR R - Residential/Local 9 2 A - AC 323 37 11,951 51 47 53 0 8/8/2023 EMILY 5D6300 EMILY DR PORTNER ST MERLINDA ST R - Residential/Local 6 2 O - AC/AC 180 38 6,840 83 0 100 0 6/28/2023 ERICA 9F9433 ERICA AVE EVANGELINA AVE END OF STREET R - Residential/Local 11 2 A - AC 620 28 17,360 76 0 57 43 7/12/2023 ERIN 9F9465 ERIN CT EVANGELINA ST END OF STREET R - Residential/Local 11 2 O - AC/AC 105 77 8,085 72 0 69 31 7/12/2023 EVANGE 9F9460 EVANGELINA ST ELENIA ST WOODGATE DR R - Residential/Local 11 2 O - AC/AC 1,204 36 43,344 72 0 58 42 7/12/2023 EVANWO 4C3730 EVANWOOD AVE CAMERON AVE SERVICE AVE R - Residential/Local 5 2 A - AC 904 38 34,325 100 0 0 0 6/26/2023 EVANWO 4C3740 EVANWOOD AVE GLENDALE ST SERVICE AVE R - Residential/Local 5 2 O - AC/AC 555 38 21,090 87 49 51 0 6/28/2023 EVANWO 4C3820 EVANWOOD AVE VINE AVE CAMERON AVE R - Residential/Local 5 2 A - AC 1,585 38 60,230 99 50 0 50 6/26/2023 EVANWO 5B5650 EVANWOOD AVE DURNESS ST MERCED AVE R - Residential/Local 5 2 A - AC 1,162 38 44,156 99 49 2 49 6/26/2023 EVANWO 5C6010 EVANWOOD AVE VINE AVE MERCED AVE R - Residential/Local 5 2 A - AC 985 38 37,430 99 50 0 50 6/26/2023 EVELYN 9F9424 EVELYN AVE EVANGELINDA AVE END OF STREET R - Residential/Local 11 2 O - AC/AC 505 28 14,140 73 0 48 52 7/12/2023 EVENIN 9ZA9002 EVENINGSIDE DR FAIRGROVE AVE BRENTWOOD DR R - Residential/Local 7 2 A - AC 1,868 36 67,248 96 0 68 32 7/19/2023 EVERGR 5F7190 EVERGREEN AVE SHASTA ST CITRUS AVE R - Residential/Local 8 2 O - AC/AC 2,450 30 73,500 72 55 44 1 6/27/2023 EVERGR 5G7500 EVERGREEN AVE CITRUS ST END OF STREET R - Residential/Local 9 2 O - AC/AC 316 28 8,848 98 0 100 0 6/27/2023 EXETER 8E9275 EXETER CT BRENTWOOD DR END OF STREET R - Residential/Local 7 2 O - AC/AC 280 28 7,840 87 0 100 0 7/14/2023 FAIRGO 9ZA9022 FAIRGROVE AVE END OF STREET W END OF STREET E R - Residential/Local 10 2 A - AC 683 36 24,588 65 0 93 7 8/9/2023 FAIRRI 9E9337 FAIRRIDGE CIR TEMPLE AVE END OF STREET R - Residential/Local 11 2 O - AC/AC 542 28 15,176 68 0 79 21 7/12/2023 FAIRWA 6G8800 FAIRWAY KNOLLS RD MONTEZUMA WY END OF STREET R - Residential/Local 10 2 A - AC 1,000 28 28,000 57 0 74 26 7/21/2023 FAIRWA 3H3300 FAIRWAY LN GRAND AVE NORTH GARVEY AVE R - Residential/Local 3 2 O - AC/AC 657 36 23,652 77 11 27 62 8/8/2023 FAITH 9F9387 FAITH ST FLORA ST FELICIA ST R - Residential/Local 11 2 A - AC 651 36 23,436 62 31 56 13 7/14/2023 FARVIE 5G7560 FAR VIEW LN SPRING MEADOW DR END OF STREET R - Residential/Local 10 2 O - AC/AC 930 15 13,950 72 17 83 0 7/26/2023 FARLIN 5A5250 FARLINGTON ST WILLOW AVE END OF STREET R - Residential/Local 4 2 A - AC 1,015 30 30,450 100 0 0 0 6/27/2023 FARLIN 5B5150 FARLINGTON ST SUNKIST AVE END OF STREET R - Residential/Local 4 2 O - AC/AC 540 30 16,200 100 0 0 0 8/8/2023 FARLIN 5B5550 FARLINGTON ST CONLON AVE ORANGE AVE R - Residential/Local 4 2 A - AC 776 38 29,488 65 43 57 0 6/26/2023 FARLIN 5B5552 FARLINGTON ST CONLON AVE TONOPAH AVE R - Residential/Local 4 2 O - AC/AC 124 38 4,712 100 0 0 0 6/26/2023 FARLIN 5B5580 FARLINGTON ST SUNSET AVE TONOPAH AVE R - Residential/Local 4 2 A - AC 754 38 28,652 100 0 0 0 6/30/2023 FARLIN 5B5660 FARLINGTON ST SHADYDALE AVE END OF STREET R - Residential/Local 5 2 O - AC/AC 610 30 18,300 95 0 100 0 7/5/2023 FARLIN 6B7810 FARLINGTON ST BROADMOOR AVE SHADYDALE AVE R - Residential/Local 5 2 O - AC/AC 235 38 8,930 88 0 100 0 7/5/2023 FAYE 9F9378 FAYE LN FRANCESCA DR FELICIA ST R - Residential/Local 11 2 A - AC 124 28 3,472 78 36 64 0 7/14/2023 FELICI 9F9376 FELICIA ST FAITH ST GABRIELLA ST R - Residential/Local 11 2 A - AC 591 36 21,276 64 0 82 18 7/14/2023 FENMEA 11G498 FENMEAD ST NOGALES ST EASTNOR AVE R - Residential/Local 12 2 O - AC/AC 239 30 7,170 50 83 17 0 7/20/2023 FENMEA 11G499 FENMEAD ST EASTNOR AVE END OF STREET R - Residential/Local 12 2 O - AC/AC 659 30 19,770 72 48 52 0 7/20/2023 FERNTO 11H527 FERNTOWER AVE HOLLINGWORTH ST MORGANFIELD AVE R - Residential/Local 12 2 A - AC 1,692 36 60,912 71 59 41 0 7/13/2023 FERNWO 4E4120 FERNWOOD ST SOUTH GARVEY AVE STUART AVE R - Residential/Local 7 2 A - AC 472 30 14,160 83 58 42 0 7/12/2023 FERWOO 4E4130 FERNWOOD ST SOUTH GARVEY AVE END OF STREET R - Residential/Local 7 2 A - AC 573 30 17,190 83 0 100 0 7/12/2023 FERNWO 4E4190 FERNWOOD ST WALNUT CREEK PKWY HOLLY OAK DR R - Residential/Local 7 2 A - AC 910 30 27,300 75 54 46 0 7/13/2023 FERNWO 4E4480 FERNWOOD ST CAMERON AVE END OF STREET R - Residential/Local 7 2 A - AC 1,027 36 36,972 83 60 40 0 6/28/2023 FERRAR 5H7710 FERRARI LN CORTEZ ST END OF STREET R - Residential/Local 9 2 A - AC 361 28 10,108 98 0 100 0 7/26/2023 FIRCRO 4F4650 FIRCROFT ST CORTEZ ST END OF STREET R - Residential/Local 8 2 A - AC 292 30 8,760 94 0 100 0 6/27/2023 FIRCRO 4F4670 FIRCROFT ST CORTEZ ST RIO VERDE DR R - Residential/Local 8 2 A - AC 932 38 35,416 53 57 43 0 6/27/2023 FIRCRO 4F4760 FIRCROFT ST WALNUT CREEK PKWY S GARVEY AVE R - Residential/Local 8 2 O - AC/AC 1,283 38 48,754 86 0 100 0 7/20/2023 FIRCRO 5F7180 FIRCROFT ST VINE AVE ALASKA ST R - Residential/Local 8 2 O - AC/AC 718 30 21,540 80 20 80 0 7/3/2023 FIRCRO 5F7450 FIRCROFT ST VINE AVE END OF STREET R - Residential/Local 10 2 O - AC/AC 730 30 21,900 83 33 67 0 7/3/2023 FLEET 3E2810 FLEETWELL AVE MARDINA ST WORKMAN AVE R - Residential/Local 2 2 A - AC 960 28 26,880 72 38 62 0 6/27/2023 FLEETW 5E6630 FLEETWELL AVE GREENVILLE DR END OF STREET R - Residential/Local 7 2 O - AC/AC 250 30 7,500 90 0 100 0 6/26/2023 FLEETW 5E6680 FLEETWELL AVE PORTNER ST END OF STREET R - Residential/Local 7 2 O - AC/AC 245 28 6,860 88 21 79 0 6/26/2023 FLEETW 5E6840 FLEETWELL AVE MOBECK ST CHARLINDA ST R - Residential/Local 7 2 O - AC/AC 329 37 12,173 74 75 25 0 6/28/2023 FLEETW 5E6890 FLEETWELL AVE ALASKA AVE THACKERY ST R - Residential/Local 7 2 O - AC/AC 190 38 7,220 86 50 50 0 6/28/2023 FLEETW 6E8490 FLEETWELL AVE MICHELLE ST MCWOOD ST R - Residential/Local 7 2 A - AC 715 38 27,170 53 37 63 0 6/30/2023 FLEMIN 10H480 FLEMINGTON DR LA PUENTE RD GAUNTLET DR R - Residential/Local 12 2 O - AC/AC 1,064 36 38,304 82 32 57 11 7/13/2023 FLEMIN 10H483 FLEMINGTON DR MILLRIDGE DR GAUNTLET DR R - Residential/Local 12 2 O - AC/AC 936 36 33,696 71 28 72 0 7/13/2023 FLORA 9F9393 FLORA ST FAITH ST GABRIELLA ST R - Residential/Local 11 2 A - AC 542 37 20,054 60 41 51 8 7/14/2023 FLOREN 6C7970 FLORENCE AVE HOLLY PL WALNUT AVE R - Residential/Local 6 2 O - AC/AC 1,283 38 48,754 75 36 64 0 6/26/2023 FLOREN 6C8000 FLORENCE AVE MULLENDER AVE END OF STREET R - Residential/Local 6 2 O - AC/AC 380 30 11,400 79 58 42 0 6/30/2023 FLOREN 6C8150 FLORENCE AVE SILVER BIRCH PL END OF STREET R - Residential/Local 6 2 O - AC/AC 270 30 8,100 72 37 63 0 6/29/2023 FLOREN 6D8350 FLORENCE AVE VALINDA AVE HOLLY PL R - Residential/Local 6 2 O - AC/AC 1,303 38 49,514 86 34 64 2 6/26/2023 FOOTHI 6G8550 FOOTHILL DR HILLSIDE DR HORIZON HILLS DR R - Residential/Local 10 2 A - AC 900 28 25,200 84 0 100 0 7/21/2023 FORD 7D9000 FORD DR BAUER DR BERGLUND DR R - Residential/Local 7 2 A - AC 414 28 11,592 87 0 44 56 8/10/2023 FORECA 10H517 FORECASTLE AVE LA PUENTE RD MORGANFIELD AVE R - Residential/Local 12 2 A - AC 712 36 25,632 63 59 41 0 7/13/2023 FORECA 11H517 FORECASTLE AVE MORGANFIELD AVE HOLLINGWORTH ST R - Residential/Local 12 2 A - AC 1,622 36 58,392 64 37 63 0 7/13/2023 FORECA 11H518 FORECASTLE AVE HOLLINGWORTH ST END OF STREET R - Residential/Local 12 2 A - AC 858 28 24,024 76 0 100 0 7/13/2023 FOREST 4H5200 FORESTDALE AVE CORTEZ ST CHARLINDA ST R - Residential/Local 9 2 A - AC 958 38 36,404 98 0 6 94 7/26/2023 FORRES 5B5490 FORREST AVE DELHAVEN ST RANDALL WY R - Residential/Local 4 2 A - AC 475 30 14,250 100 0 0 0 6/30/2023 FOSTER 5B5140 FOSTER AVE ORANGE AVE SUNKIST AVE R - Residential/Local 4 2 A - AC 764 38 29,032 100 0 0 0 8/8/2023 FOXDAL 2C1410 FOXDALE AVE PUENTE AVE ELGENIA AVE R - Residential/Local 1 2 O - AC/AC 1,200 38 45,600 69 68 32 0 6/29/2023 FOXDAL 2C1420 FOXDALE AVE ROWLAND AVE PUENTE AVE R - Residential/Local 1 2 O - AC/AC 1,235 38 46,930 77 13 63 24 6/29/2023
City of West Covina, CA
Pavement Condition Index (PCI) Report - All Streets
Sorted by Rank, Name Order (A-Z)
FOXDAL 3C1630 FOXDALE AVE WORKMAN AVE DEL NORTE ST R - Residential/Local 1 2 O - AC/AC 536 28 15,008 81 40 58 2 6/29/2023 FOXLAK 11H543 FOXLAKE AVE POINT CEDAR AVE LANESBORO DR R - Residential/Local 12 2 A - AC 582 28 16,296 100 0 0 0 7/13/2023 FRANCE 9F9380 FRANCESCA DR NOGALES ST WOODGATE DR R - Residential/Local 11 2 A - AC 701 36 25,236 88 0 100 0 7/14/2023 FRANDA 6D8390 FRANDALE AVE ALWOOD ST FRANCISQUITO AVE R - Residential/Local 6 2 A - AC 438 36 15,768 49 53 47 0 6/29/2023 FRIEDA 9F9390 FRIEDA CT FLORA ST END OF STREET R - Residential/Local 11 2 A - AC 228 28 6,384 84 0 100 0 7/14/2023 FRIEDA 9F9391 FRIEDA CT FLORA ST GLORIA ST R - Residential/Local 11 2 A - AC 223 28 6,244 85 9 91 0 7/14/2023 FRIJO 2C1390 FRIJO AVE ALISAL ST LOUISA AVE R - Residential/Local 1 2 A - AC 350 30 10,500 83 51 49 0 6/29/2023 GABRIE 9F9367 GABRIELLA ST GLORIA ST GAIL CT R - Residential/Local 11 2 A - AC 511 36 18,396 82 0 100 0 7/14/2023 GABRIE 9F9369 GABRIELLA ST GAIL CT END OF STREET R - Residential/Local 11 2 A - AC 338 28 9,464 81 0 81 19 7/14/2023 GABRIE 9F9375 GABRIELLA ST FELICIA ST FLORA ST R - Residential/Local 11 2 A - AC 224 36 8,064 62 32 56 12 7/14/2023 GAIL 9G9468 GAIL CT GABRIELLA ST END OF STREET R - Residential/Local 11 2 A - AC 264 28 7,392 80 0 73 27 7/14/2023 GALSTE 6F8655 GALSTER WY AROMA DR WESTRIDGE RD R - Residential/Local 10 2 A - AC 1,025 38 38,950 92 0 100 0 7/20/2023 GARDEN 4D4040 GARDEN GLEN ST WALNUT CREEK PKWY STUART AVE R - Residential/Local 6 2 O - AC/AC 738 38 28,044 84 0 64 36 7/12/2023 GARDEN 4D4050 GARDEN GLEN ST STUART AVE DALEWOOD ST R - Residential/Local 6 2 A - AC 720 38 27,360 72 49 49 2 7/12/2023 GARDEN 4D4055 GARDEN GLEN ST S. GAREY AVE. DALEWOOD ST. R - Residential/Local 6 2 O - AC/AC 495 38 18,810 82 0 100 0 7/12/2023 GARVEY 9ZA9026 GARVEY AVE (S) CALVADOS AVE MOCKINGBIRD LN R - Residential/Local 8 2 A - AC 346 28 9,688 65 0 100 0 8/10/2023 GAUNTL 10H407 GAUNTLET DR HEDGEROW DR HILLTONIA DR R - Residential/Local 12 2 O - AC/AC 1,552 28 43,456 91 0 100 0 7/13/2023 GAUNTL 10H463 GAUNTLET DR FLEMINGTON DR HEDGEROW DR R - Residential/Local 12 2 O - AC/AC 667 28 18,676 94 0 80 20 7/13/2023 GAYBAR 4D3930 GAYBAR AVE SERVICE AVE END OF STREET R - Residential/Local 6 2 O - AC/AC 405 30 12,150 74 32 68 0 6/28/2023 GAYBAR 4D3960 GAYBAR AVE LARKWOOD ST CHARLINDA ST R - Residential/Local 6 2 O - AC/AC 680 30 20,400 58 56 44 0 6/28/2023 GAYBAR 5D6140 GAYBAR AVE CAMERON AVE END OF STREET R - Residential/Local 6 2 O - AC/AC 200 28 5,600 80 43 57 0 6/29/2023 GAYBAR 5D6280 GAYBAR AVE PORTNER ST VINE AVE R - Residential/Local 6 2 O - AC/AC 297 38 11,286 83 0 100 0 6/28/2023 GEHRIG 10F380 GEHRIG ST TINKER ST END OF STREET R - Residential/Local 11 2 O - AC/AC 497 28 13,916 84 0 31 69 7/19/2023 GEHRIG 10G380 GEHRIG ST CHANCE ST TINKER ST R - Residential/Local 11 2 A - AC 638 36 22,968 78 31 39 30 7/19/2023 GEMINI 10E257 GEMINI ST SHADOW OAK DR GIANO AVE R - Residential/Local 11 2 A - AC 1,816 36 65,376 78 0 47 53 7/19/2023 GEMINI 10E275 GEMINI ST KIMBERLY DR GIANO AVE R - Residential/Local 11 2 A - AC 709 36 25,524 81 0 84 16 7/19/2023 GIANO 10E260 GIANO AVE GEMINI ST WEDNESDAY DR R - Residential/Local 11 2 A - AC 918 37 33,966 55 57 34 9 7/19/2023 GIANO 10E262 GIANO AVE WEDNESDAY DR CITY BOUNDARY R - Residential/Local 11 2 O - AC/AC 648 36 23,328 85 55 45 0 7/19/2023 GINA 9F9373 GINA LN GABRIELLA ST NOGALES ST R - Residential/Local 11 2 A - AC 108 28 3,024 95 0 100 0 7/14/2023 GINGER 9F9370 GINGER CT GABRIELLA ST END OF STREET R - Residential/Local 11 2 A - AC 397 28 11,116 85 0 100 0 7/14/2023 GLADBR 11G503 GLADBROOK AVE HIGHCASTLE ST END OF STREET R - Residential/Local 12 2 A - AC 205 31 6,355 90 0 75 25 7/20/2023 GLENDA 4C3840 GLENDALE ST CALIFORNIA AVE EVANWOOD AVE R - Residential/Local 5 2 O - AC/AC 755 36 27,180 88 29 71 0 6/28/2023 GLENHU 9F9403 GLENHURST PL GREENLEAF DR END OF STREET R - Residential/Local 11 2 O - AC/AC 1,110 36 39,960 72 0 66 34 7/12/2023 GLENHU 10F300 GLENHURST ST HENDEE ST GEMINI ST R - Residential/Local 11 2 O - AC/AC 440 36 15,840 68 3 66 31 7/19/2023 GLENME 5A5370 GLENMERE ST SUNKIST AVE ORANGE AVE R - Residential/Local 4 2 A - AC 770 38 29,260 62 75 25 0 6/30/2023 GLENME 5B5530 GLENMERE ST CABANA AVE TONOPAH AVE R - Residential/Local 4 2 A - AC 570 30 17,100 100 0 0 0 6/30/2023 GLENME 5B5555 GLENMERE ST ORANGE AVE CONLON AVE R - Residential/Local 4 2 A - AC 775 30 23,250 100 0 0 0 6/30/2023 GLENME 6B7240 GLENMERE ST CALIFORNIA AVE ST. MALO ST R - Residential/Local 5 2 A - AC 333 36 11,988 95 0 100 0 7/5/2023 GLENME 6B7800 GLENMERE ST SHADYDALE AVE END OF STREET R - Residential/Local 5 2 O - AC/AC 607 30 18,210 83 8 92 0 7/5/2023 GLENNA 4F4860 GLENN ALAN AVE RIO VERDE DR CORTEZ ST R - Residential/Local 8 2 A - AC 658 28 18,424 68 44 56 0 7/3/2023 GLENNA 4F4920 GLENN ALAN AVE LARKWOOD ST END OF STREET R - Residential/Local 8 2 A - AC 494 30 14,820 97 0 100 0 7/3/2023 GLENNA 5F7000 GLENN ALAN AVE MERCED AVE LINDA VISTA ST R - Residential/Local 8 2 A - AC 600 38 22,800 79 20 80 0 6/26/2023 GLENNA 5F7170 GLENN ALAN AVE LINDA VISTA ST VINE AVE R - Residential/Local 8 2 A - AC 660 38 25,080 85 0 100 0 6/26/2023 GLENNA 5F7360 GLENN ALAN AVE CAMERON AVE END OF STREET R - Residential/Local 8 2 A - AC 184 30 5,520 94 0 100 0 7/3/2023 GLENNA 5F7365 GLENN ALAN AVE CAMERON AVE END OF STREET R - Residential/Local 8 2 O - AC/AC 550 30 16,500 85 25 75 0 7/3/2023 GLENNA 6F8780 GLENN ALAN AVE MICHELLE ST HEATH TERRACE R - Residential/Local 10 2 A - AC 860 30 25,800 68 65 35 0 6/30/2023 GLENRI 9E9343 GLENRIDGE CIR TEMPLE AVE END OF STREET R - Residential/Local 11 2 O - AC/AC 481 29 13,949 64 16 61 22 7/12/2023 GLENSH 4C3830 GLENSHAW DR CAMERON AVE CAMILLA RD R - Residential/Local 5 2 O - AC/AC 541 30 16,230 97 0 100 0 6/26/2023 GLENSH 5C5850 GLENSHAW DR VINE AVE ROBINDALE ST R - Residential/Local 5 2 O - AC/AC 560 30 16,800 84 11 84 5 6/28/2023 GLENVI 5E6650 GLENVIEW RD VINE AVE MERCED AVE R - Residential/Local 7 2 A - AC 1,270 38 48,260 85 40 60 0 6/26/2023 GLENVI 5E6720 GLENVIEW RD THACKERY ST VINE AVE R - Residential/Local 7 2 O - AC/AC 340 34 11,560 100 0 0 0 6/28/2023 GLENVI 5E6722 GLENVIEW RD THACKERY ST END OF STREET R - Residential/Local 7 2 O - AC/AC 430 38 16,340 82 43 57 0 6/28/2023 GLENVI 6E8480 GLENVIEW RD FRANCISQUITO AVE MICHELLE ST R - Residential/Local 7 2 O - AC/AC 990 38 37,620 91 0 100 0 6/30/2023 GLORIA 9F9385 GLORIA ST GABRIELLA ST END OF STREET R - Residential/Local 11 2 A - AC 582 28 16,296 76 34 52 14 7/14/2023 GOLDEN 6G8791 GOLDEN VISTA DR MONTEZUMA WY MONTEZUMA WY R - Residential/Local 10 2 A - AC 1,485 32 47,520 89 0 100 0 7/21/2023 GOODWI 11H537 GOODWICK DR FORECASTLE AVE END OF STREET R - Residential/Local 12 2 A - AC 178 28 4,984 69 0 100 0 7/13/2023 GRACE 2E2620 GRACE COURT PUENTE AVE END OF STREET R - Residential/Local 2 2 A - AC 284 30 8,520 84 0 74 26 6/29/2023 GRANDV 7D8940 GRAND VIEW LN AMAR RD EDEN VIEW LN R - Residential/Local 7 2 A - AC 1,720 36 61,920 90 0 59 41 8/9/2023 GRASSM 11G507 GRASSMERE AVE FENMEAD ST CITY BOUNDARY R - Residential/Local 12 2 A - AC 80 33 2,640 88 0 100 0 7/20/2023 GREENR 7F8620 GREEN RIDGE TERRACE HILLSIDE DR END OF STREET R - Residential/Local 10 2 A - AC 476 28 13,328 76 0 98 2 7/21/2023 GREENB 2D1870 GREENBERRY AVE PUENTE AVE NORTH CITY BOUNDARY R - Residential/Local 1 2 O - AC/AC 690 38 26,220 88 0 100 0 7/26/2023 GREENB 5C5890 GREENBERRY AVE CRUMLEY ST HERALD ST R - Residential/Local 5 2 O - AC/AC 286 30 8,580 64 60 40 0 6/26/2023 GREENB 4C3760 GREENBERRY DR CAMILLA RD CAMERON AVE R - Residential/Local 5 2 O - AC/AC 454 30 13,620 92 0 100 0 6/26/2023 GREENB 9F9360 GREENBOROUGH PL WOODGATE DR END OF STREET R - Residential/Local 11 2 O - AC/AC 579 28 16,212 64 28 53 19 7/12/2023 GREENB 9F9302 GREENBRIAR PLACE WOODGATE DR END OF STREET R - Residential/Local 11 2 A - AC 383 28 10,724 75 0 62 38 7/12/2023 GREEND 2D2100 GREENDALE ST HARTLEY ST VINCENT AVE R - Residential/Local 1 2 A - AC 1,070 38 40,660 59 47 53 1 7/21/2023 GREEND 2D2105 GREENDALE ST VINCENT AVE END OF STREET R - Residential/Local 2 2 A - AC 580 30 17,400 56 54 46 0 8/7/2023 GREENL 10F283 GREENLEAF CT GEMINI ST END OF STREET R - Residential/Local 11 2 O - AC/AC 202 28 5,656 71 0 71 29 7/19/2023 GREENL 9E9310 GREENLEAF DR ALTAMIRA DR GREENLEAF DR R - Residential/Local 11 2 O - AC/AC 1,530 36 55,080 67 30 56 14 7/12/2023 GREENL 9F9310 GREENLEAF DR WOODGATE DR GREENLEAF DR R - Residential/Local 11 2 O - AC/AC 836 37 30,932 69 36 43 21 7/12/2023 GREENL 9F9413 GREENLEAF DR WOODGATE DR END OF STREET R - Residential/Local 11 2 O - AC/AC 1,115 37 41,255 76 4 66 31 7/12/2023 GREENL 10F285 GREENLEAF ST HENDEE ST IRENE ST R - Residential/Local 11 2 O - AC/AC 334 36 12,024 66 28 60 12 7/19/2023 GREENV 5D6230 GREENVILLE DR PIMA AVE LARK ELLEN AVE R - Residential/Local 6 2 A - AC 1,135 38 43,130 75 32 63 4 6/28/2023 GREENV 5D6335 GREENVILLE DR NEFF AVE GRETTA AVE R - Residential/Local 6 2 A - AC 294 28 8,232 73 47 53 0 6/28/2023 GREENV 5E6660 GREENVILLE DR AZUSA AVE GLENVIEW RD R - Residential/Local 7 2 O - AC/AC 1,120 38 42,560 82 62 38 0 6/26/2023 GREENV 5F7110 GREENVILLE DR HOLLENBECK ST END OF STREET R - Residential/Local 10 2 O - AC/AC 838 38 31,844 76 40 60 0 6/30/2023 GREENV 5F7120 GREENVILLE DR GREENVILLE DR END OF STREET R - Residential/Local 10 2 O - AC/AC 120 30 3,600 85 0 100 0 6/30/2023
City of West Covina, CA
Pavement Condition Index (PCI) Report - All Streets
Sorted by Rank, Name Order (A-Z)
GREENV 5F7160 GREENVILLE DR AZUSA AVE GLENN ALAN AVE R - Residential/Local 8 2 O - AC/AC 1,111 38 42,218 85 0 100 0 6/26/2023 GREENV 6D6467 GREENVILLE DR CRAIG DR END OF STREET R - Residential/Local 6 2 A - AC 240 38 9,120 68 50 50 0 6/29/2023 GREENV 6D8260 GREENVILLE DR CRAIG AVE SUSANNA AVE R - Residential/Local 6 2 A - AC 1,060 38 40,280 55 52 48 0 6/29/2023 GREENV 6D8265 GREENVILLE DR SUSANNA AVE SERENADE AVE R - Residential/Local 6 2 A - AC 287 30 8,610 50 55 27 18 6/29/2023 GRENOB 6E8600 GRENOBLE AVE AZUSA AVE DOUBLEGROVE ST R - Residential/Local 7 2 O - AC/AC 850 36 30,600 99 0 100 0 7/19/2023 GRETTA 4D3940 GRETTA AVE SERVICE AVE END OF STREET R - Residential/Local 6 2 O - AC/AC 292 30 8,760 72 23 77 0 6/28/2023 GRETTA 4D3970 GRETTA AVE CHARLINDA ST LARKWOOD ST R - Residential/Local 6 2 A - AC 650 30 19,500 36 77 23 0 6/28/2023 GRETTA 5D6080 GRETTA AVE VINE AVE BLUE DR R - Residential/Local 6 2 O - AC/AC 530 30 15,900 88 0 100 0 6/28/2023 GRETTA 5D6130 GRETTA AVE HERRING AVE CAMERON AVE R - Residential/Local 6 2 O - AC/AC 465 38 17,670 59 13 87 0 6/29/2023 GRETTA 5D6160 GRETTA AVE TRUMAN PL END OF STREET R - Residential/Local 6 2 O - AC/AC 403 28 11,284 51 29 71 0 6/28/2023 GRETTA 5D6165 GRETTA AVE TRUMAN PL MERCED AVE R - Residential/Local 6 2 O - AC/AC 624 36 22,464 49 57 43 0 6/28/2023 GRETTA 6D8220 GRETTA AVE CITY BOUNDARY (S/ MICHELLE ST) END OF STREET R - Residential/Local 6 2 O - AC/AC 373 32 11,936 76 60 40 0 6/26/2023 GROVEC 2D1910 GROVECENTER ST CITY BOUNDARY (E/ GREENBERRY AVE) VINCENT AVE R - Residential/Local 1 2 A - AC 285 38 10,830 86 27 69 4 7/28/2023 GROVEC 2D2020 GROVECENTER ST CARVOL AVE ASTELL AVE R - Residential/Local 2 2 A - AC 450 38 17,100 79 2 76 22 6/29/2023 GROVEC 2D2120 GROVECENTER ST VINCENT AVE CARVOL AVE R - Residential/Local 2 2 O - AC/AC 1,550 30 46,500 72 37 63 0 6/29/2023 GROVEC 2E2600 GROVECENTER ST END OF STREET PHILLIPS AVE R - Residential/Local 3 2 A - AC 308 38 11,704 87 0 100 0 7/26/2023 GROVEC 3C1490 GROVECENTER ST LA SENA AVE ORANGE AVE R - Residential/Local 1 2 O - AC/AC 637 30 19,110 80 14 84 2 7/3/2023 HACKLE 11G493 HACKLEY AVE HOLLINGSWORTH ST VALLEY VIEW AVE R - Residential/Local 12 2 A - AC 1,001 36 36,036 82 0 100 0 7/20/2023 HALINO 4A3450 HALINOR AVE ITUNI ST CITY BOUNDARY R - Residential/Local 4 2 A - AC 648 28 18,144 100 0 0 0 8/7/2023 HALSEY 6H8680 HALSEY CT HOLIDAY DR END OF STREET R - Residential/Local 10 2 A - AC 180 28 5,040 71 0 100 0 7/20/2023 HAMPTO 6H8660 HAMPTON DR HOLIDAY DR END OF STREET R - Residential/Local 10 2 A - AC 420 28 11,760 71 0 100 0 7/20/2023 HARBER 3C1590 HARBERT ST LANG AVE ROBERTO AVE R - Residential/Local 1 2 A - AC 902 34 30,668 59 45 55 0 7/21/2023 HARRIN 7D9065 HARRINGTON WY SUMMERPLACE DR DRYDEN LN R - Residential/Local 7 2 A - AC 600 38 22,800 88 31 69 0 8/10/2023 HARTLE 2D2140 HARTLEY ST PUENTE AVE NORTH CITY BOUNDARY R - Residential/Local 1 2 A - AC 725 38 27,550 84 21 79 0 7/26/2023 HARTLE 2D2160 HARTLEY ST ROWLAND AVE PUENTE AVE R - Residential/Local 1 2 O - AC/AC 1,273 38 48,374 75 44 56 0 7/26/2023 HARTLE 2D2170 HARTLEY ST ROWLAND AVE WORKMAN AVE R - Residential/Local 1 2 O - AC/AC 1,283 38 48,754 64 56 44 0 7/21/2023 HARTLE 3D2440 HARTLEY ST WORKMAN AVE NORTH GARVEY AVE R - Residential/Local 1 2 O - AC/AC 986 38 37,460 83 0 100 0 7/14/2023 HARVES 7D8980 HARVEST MOON ST E. END OF STREET W. END OF STREET R - Residential/Local 7 2 O - AC/AC 520 28 14,560 71 0 61 39 8/10/2023 HARVES 7E9110 HARVEST MOON ST LARK ELLEN AVE END OF STREET R - Residential/Local 7 2 O - AC/AC 1,290 38 49,020 97 0 100 0 7/19/2023 HAVENB 3A3125 HAVENBROOK ST PUENTE AVE ARDILLA AVE. R - Residential/Local 1 2 O - AC/AC 950 34 32,300 65 0 61 39 7/5/2023 HAVENB 4B3484 HAVENBROOK ST ARDILLA AVE MACDEVITT ST R - Residential/Local 1 2 A - AC 1,056 38 40,128 47 56 17 27 7/5/2023 HEATH 6F8660 HEATH TERRACE GLENN ALAN AVE DONNA BETH AVE R - Residential/Local 10 2 A - AC 350 30 10,500 71 20 80 0 6/30/2023 HEATHE 5F7230 HEATHER LN EVERGREEN AVE END OF STREET R - Residential/Local 8 2 O - AC/AC 223 30 6,690 76 37 63 0 6/27/2023 HEDGER 10H465 HEDGEROW DR MILLRIDGE DR GAUNTLET DR R - Residential/Local 12 2 A - AC 1,111 28 31,108 100 0 0 0 7/13/2023 HELEN 10F306 HELEN LN GEMINI ST END OF STREET R - Residential/Local 11 2 O - AC/AC 342 36 14,312 66 0 70 30 7/19/2023 HEMSTE 6H8610 HEMSTEAD CT HOOPER DR END OF STREET R - Residential/Local 10 2 A - AC 210 30 6,300 76 49 44 7 7/20/2023 HENDEE 10F287 HENDEE ST GLENHURST ST GREENLEAF ST R - Residential/Local 11 2 O - AC/AC 469 36 16,884 68 0 67 33 7/19/2023 HERALD 5C5710 HERALD ST CALIFORNIA AVE END OF STREET R - Residential/Local 5 2 A - AC 692 30 20,760 97 0 100 0 6/26/2023 HERALD 5C5860 HERALD ST CALIFORNIA AVE EVANWOOD AVE R - Residential/Local 5 2 O - AC/AC 774 30 23,220 67 67 33 0 6/26/2023 HERITA 5H7650 HERITAGE DR HILLSIDE DR EAST HILS DR R - Residential/Local 10 2 A - AC 1,616 30 48,480 83 12 88 0 7/21/2023 HERRIN 5D6120 HERRING AVE VALINDA AVE GRETTA AVE R - Residential/Local 6 2 A - AC 1,095 38 41,610 76 0 100 0 6/29/2023 HERRIN 5D6180 HERRING AVE PIMA AVE LARK ELLEN AVE R - Residential/Local 6 2 O - AC/AC 1,110 29 32,190 64 58 40 2 6/28/2023 HERRIN 5D6480 HERRING AVE HOLLY PL GLENDORA AVE R - Residential/Local 6 2 A - AC 1,015 38 38,570 37 58 42 0 6/29/2023 HERRIN 5D6490 HERRING AVE VALINDA AVE HOLLY PL R - Residential/Local 6 2 O - AC/AC 1,250 38 47,500 54 57 43 0 6/29/2023 HERRIN 5E6830 HERRING AVE LARKELLEN AVE LEAF AVE R - Residential/Local 7 2 O - AC/AC 1,097 30 32,910 100 0 100 0 6/28/2023 HIDDEN 6F8787 HIDDEN VALLEY DR COUNTRYWOOD LN END OF STREET R - Residential/Local 10 2 A - AC 1,340 30 40,200 80 46 54 0 7/21/2023 HIDEOU 6H8640 HIDEOUT DR HIGHLIGHT DR HOLIDAY DR R - Residential/Local 10 2 O - AC/AC 765 30 22,950 100 0 0 0 7/20/2023 HIGHCA 11G500 HIGHCASTLE ST CITY BOUNDARY (E/ GENDEL DR) END OF STREET R - Residential/Local 12 2 O - AC/AC 954 33 31,482 64 63 35 2 7/20/2023 HIGHLI 6H8620 HIGHLIGHT DR HILLSIDE DR END OF STREET R - Residential/Local 10 2 A - AC 2,170 30 65,100 80 44 34 22 7/20/2023 HIGHSP 6F8767 HIGHSPIRE DR HOLLENCREST DR ALPINE DR R - Residential/Local 10 2 O - AC/AC 286 38 10,868 76 32 68 0 7/21/2023 HILLBO 5F7020 HILLBORN AVE VINE AVE LINDA VISTA ST R - Residential/Local 8 2 O - AC/AC 465 30 13,950 80 59 41 0 6/26/2023 HILLBO 4F4890 HILLBORN ST CORTEZ ST RIO VERDE DR R - Residential/Local 8 2 A - AC 884 30 26,520 70 32 68 0 7/3/2023 HILLHA 3H3270 HILLHAVEN DR MIRIAM DR END OF STREET R - Residential/Local 3 2 O - AC/AC 1,520 30 45,600 75 60 32 9 8/8/2023 HILLHA 3H3273 HILLHAVEN DR NORTH GARVEY AVE MIRIAM DR R - Residential/Local 3 2 O - AC/AC 158 36 5,688 86 0 100 0 8/8/2023 HILLSB 9F9405 HILLSBOROUGH PL WOODGATE DR END OF STREET R - Residential/Local 11 2 A - AC 496 28 13,888 72 0 67 33 7/12/2023 HILLSI 5H7720 HILLSIDE DR EAST HILLS DR GRAND AVE R - Residential/Local 10 2 O - AC/AC 3,165 36 113,940 81 0 98 2 7/20/2023 HILLSI 6G8560 HILLSIDE DR FAIRWAY KNOLLS RD FOOTHILL DR R - Residential/Local 10 2 A - AC 1,690 38 64,220 84 0 100 0 7/20/2023 HILLSI 6G8580 HILLSIDE DR FOOTHILL DR MT TRICIA AVE R - Residential/Local 10 2 A - AC 1,793 36 64,548 69 0 84 16 7/20/2023 HILLSI 6G8590 HILLSIDE DR MT TRICIA AVE END OF STREET R - Residential/Local 10 2 A - AC 1,213 36 43,668 70 0 100 0 7/20/2023 HILLSI 6G8820 HILLSIDE DR FAIRWAY KNOLLS RD EAST HILLS DR R - Residential/Local 10 2 O - AC/AC 3,384 38 128,592 91 0 97 3 7/20/2023 HILLTO 10H471 HILLTONIA DR CAMINO DE TEODORO WHITINGHAM DR R - Residential/Local 12 2 A - AC 411 28 11,508 100 0 0 0 7/13/2023 HILLTO 10H477 HILLTONIA DR WHITTINGHAM DR FLEMINGTON DR R - Residential/Local 12 2 O - AC/AC 1,360 36 48,960 74 46 54 0 7/13/2023 HILLTO 10H478 HILLTONIA DR FLEMINGTON DR END OF STREET R - Residential/Local 12 2 O - AC/AC 110 38 4,180 74 31 69 0 7/13/2023 HILLWA 4F4895 HILLWARD AVE RIO VERDE DR CORTEZ ST R - Residential/Local 8 2 A - AC 867 30 26,010 57 57 40 3 7/3/2023 HILLWA 4F4900 HILLWARD AVE CORTEZ ST DANIELS AVE R - Residential/Local 8 2 O - AC/AC 882 38 33,516 54 66 34 0 7/3/2023 HILLWA 4F4905 HILLWARD AVE DANIELS AVE END OF STREET R - Residential/Local 8 2 O - AC/AC 290 30 8,700 83 40 57 3 7/3/2023 HILLWA 5F7250 HILLWARD AVE VINE AVE LINDA VISTA ST R - Residential/Local 8 2 O - AC/AC 525 30 15,750 87 53 47 0 6/26/2023 HILLWA 5F7350 HILLWARD AVE CAMERON AVE THACKERY ST R - Residential/Local 8 2 A - AC 1,056 38 40,128 54 44 56 0 6/30/2023 HILLWA 5F7370 HILLWARD AVE CAMERON AVE END OF STREET R - Residential/Local 8 2 O - AC/AC 190 30 5,700 98 0 100 0 6/30/2023 HILLWA 6F8750 HILLWARD AVE MICHELLE ST END OF STREET R - Residential/Local 10 2 A - AC 1,350 38 51,300 83 35 65 0 6/30/2023 HILLWA 4F4840 HILLWARD ST NORMA AVE WALNUT CREEK PKWY R - Residential/Local 8 2 O - AC/AC 692 30 20,760 78 18 78 4 7/13/2023 HOLIDA 6H8650 HOLIDAY DR HILLSIDE DR END OF STREET R - Residential/Local 10 2 A - AC 1,960 28 54,880 80 54 46 0 7/20/2023 HOLLEN 6F8765 HOLLENCREST CIR HOLLENCREST DR END OF STREET R - Residential/Local 10 2 A - AC 135 30 4,050 79 0 100 0 7/21/2023 HOLLEN 6F8745 HOLLENCREST DR HIGHSPIRE DR HILLSIDE DR R - Residential/Local 10 2 A - AC 500 38 19,000 29 56 44 0 7/21/2023 HOLLEN 6F8747 HOLLENCREST DR CASA GRANDE DR CASA LINDA DR R - Residential/Local 10 2 A - AC 870 38 33,060 68 62 38 0 7/21/2023 HOLLEN 6F8755 HOLLENCREST DR CASA LINDA DR HOLLENCREST CIR R - Residential/Local 10 2 A - AC 650 38 24,700 93 0 100 0 7/21/2023 HOLLEN 6F8775 HOLLENCREST DR HOLLENCREST CIR HIGHSPIRE DR R - Residential/Local 10 2 O - AC/AC 800 38 30,400 83 37 54 9 7/21/2023