City Hall, Council Chambers cityofwestsacramento.org
1110 West Capitol Avenue, 2nd Floor
The City of West Sacramento welcomes your participation.
City Council meeting agendas are published in both English and Spanish.
Meeting Schedule: Regular meetings of the City Council are held on the first and third Wednesdays of each month at 7:00 p.m. Please review the online meeting calendar for any potential changes to the schedule.
In-Person Comment on Agenda Items: Submit a request to speak card with the City Clerk prior to the conclusion of the Public Comment period or prior to the conclusion of the staff presentation on the item that you wish to make a comment.
Each speaker has three (3) minutes to address the Council unless the maximum time allowed is amneded by the Mayor.
The in-person comment period will conclude before the virtual public comment begins. No additional in-person comments for an item will be heard following the conculsion of the in-person comment period.
Remote Public Comment on Agenda Items: Members of the public may participate remotely via Zoom as indicated below.
Speakers who wish to provide public comment must raise their virtual hand when prompted by the City Clerk. Members of the public participating by telephone may raise their hand to provide comment by pressing *9. Each speaker has three (3) minutes to address the Council unless the maximum time allowed is amneded by the Mayor. The remote comment period will close when the last remote speaker finishes speaking.
Remote participation: www.zoom.com
Telephone: 253-215-8782 or 669-444-9171
Meeting ID: 827 0148 3909
Public speakers, in-person or remote, may not share video or visual aids (i.e. pdf, ppt, docs) during their comment period.
Brown Act: According to State Law, the City Council is prohibited from discussing or acting on any issues not on the agenda.
Levine Act Provisions: Any party to a permit, license, contract (other than competitively bid, labor or personal employment contracts) or other entitlement before the Council is required to disclose on the record any contribution, including aggregated contributions, of more than $500 made by the party or the party’s agents within the preceding 12 months to any Council Member. Participants and agents are requested to make this disclosure as well. The disclosure must include the name of the party or participant and any other person making the contribution, the name of the recipient, the amount of the contribution, and the date the contribution was made.
Americans with Disabilites Act: If assistance is required to participate in a meeting, including the need of auxillary aids or translation services, please notify the City Clerk’s Office at least 72 hours in advance of the meeting. City Clerk 1110 West Capitol Avenue, [email protected], 916-617-4500.
Translated Agendas: You may request a translated agenda or items included in the agenda packet by contacting the City Clerk 72 hours in advance of the meeting. City Clerk 1110 West Capitol Avenue, [email protected], 916- 617-4500.
Security Measures: All meeting attendees must successfully pass through security. Any person with a prohibited item will not be allowed entry. Prohibited items include but are not limited to firearms (even with valid CCW), knives, pepper spray/mace, explosives of any kind/any weapons and/or dangerous devices of any kind, illegal drugs, and alcohol.
Viewing Options: The City of West Sacramento provides multiple options for viewing meetings:
• In-Person
• Online via Zoom or YouTube www.youtube.com/@cityofwestsac • Broadcast live on Wave Cable Channel 20 and rerun the next day at 12: 00 p.m. and the following Saturday at 6:00 p.m. 1
Martha Guerrero, Mayor
Verna Sulpizio Hull, Mayor Pro Tem
Quirina Orozco, Councilmember
Norma Alcala, Councilmember
Dawnte Early, Councilmember
Aaron Laurel, City Manager
Jeff Mitchell, City Attorney
AGENDA
REGULAR MEETING OF THE WEST SACRAMENTO CITY COUNCIL AND
WEST SACRAMENTO REDEVELOPMENT SUCCESSOR AGENCY & WEST SACRAMENTO FINANCING
AUTHORITY
AUGUST 19, 2026
City Council Regular Meeting 7:00 PM
CITY HALL
1110 WEST CAPITOL AVENUE, 2ND FLOOR
I. CALL TO ORDER
II. PLEDGE OF ALLEGIANCE
III. LAND ACKNOWLEDGEMENT
IV. MEETING PROCEDURES
GENERAL ADMINISTRATION FUNCTION – PART I
1. PRESENTATIONS BY THE PUBLIC ON MATTERS NOT ON THE AGENDA WITHIN THE
JURISDICTION OF THE COUNCIL
PRESENTATIONS
2. City Manager's Office
PRESENTATION OF PROCLAMATION RECOGNIZING THE WEST SACRAMENTO GIRLS
SOFTBALL PROGRAM
Recommendation: Staff respectfully recommends that the City Council adopt the proclamation recognizing the West Sacramento Girls Softball program for its positive impact on youth development, community engagement, and recent achievement.
3. City Manager's Office
PROCLAMATION OF THE CITY OF WEST SACRAMENTO CITY COUNCIL RECOGNIZING ELIZABETH “LIZZY” SPINK
Recommendation: Staff respectfully recommend that the City Council adopt the attached proclamation recognizing Lizzy Spink.
CONSENT AGENDA
4. Capital Projects
CONSIDERATION OF RESOLUTION 26-77 DELEGATING AUTHORITY TO THE CITY
MANAGER TO UNDERTAKE CERTAIN ACTIONS TO COMMENCE AND COMPLETE REAL PROPERTY TRANSACTIONS AND CONSIDERATION OF CONTRACT AMENDMENT NO.1 WITH WOOD RODGERS, INC. FOR THE NORTH 5TH STREET COMPLETE STREET PROJECT (CIP 16013)
Recommendation: Staff respectfully recommends that the City Council: 1) Adopt Resolution 26- 77, delegating authority to the City Manager to undertake certain actions to commence and complete all real property transactions for the Project (Attachment 1); 2) Approve and authorize the City Manager, or his designee, to execute Amendment No. 1 (Attachment 3) to the professional services contract with Wood Rodgers, Inc. in the amount of $203,601.74; 3) Authorize the City 2 Manager, or his designee, to execute non-substantive changes or modifications, with approval from the City Attorney; and 4) Authorize the City Manager, or his designee, to execute amendments to further extend the term of the contract, if necessary.
5. Capital Projects
CONSIDERATION OF APPROVAL OF A PROFESSIONAL SERVICES CONTRACT WITH
SCHAAF & WHEELER FOR PROFESSIONAL ENGINEERING SERVICES FOR THE BRYTE SEWER PUMP STATION REHABILITATION PROJECT (CIP 33031)
Recommendation: Staff respectfully recommends that the City Council: 1. Award a professional services contract with Schaaf & Wheeler for engineering services for the Bryte Sewer Pump Station Rehabilitation Project (CIP 33031); 2. Authorize the City Manager, or his designee, to execute a professional services contract with Schaaf & Wheeler in an amount not to exceed $1,001,540, which includes any optional tasks; 3. Delegate authority to the City Manager, or his designee, to authorize any optional tasks. Optional tasks will remain optional unless and until expressly authorized in writing; 4. Authorize the City Manager or his designee to make contract amendments up to 10% ($100,154) of the total value of the contract; 5. Authorize the City Manager, or his designee, to execute non-substantive changes or modifications to this professional services contract, with approval from the City Attorney; and 6. Authorize the City Manager, or his designee, to execute amendments to extend the term of this contract, if necessary.
6. Community Development
CONSIDERATION OF APPROVAL OF A PROFESSIONAL SERVICES CONTRACT WITH WSP USA, INC. FOR TECHNICAL TRANSIT PLANNING SERVICES AND PREPARATION OF THE WEST SAC FORWARD TRANSIT PRIORITY PLAN (CIP 12022)
Recommendation: Staff respectfully recommends that the City Council: 1) Authorize the City Manager, or his designee, to execute a professional services agreement with WSP USA, INC. (WSP) for technical transit planning services (CIP 12022), in an amount not to exceed $847,578; 2) Authorize the City Manager, or his designee, to make contract amendments up to $85,000 of the total contract value; and 3) Authorize the City Manager, or his designee, to execute nonsubstantive changes or administrative modifications to the services contract, with approval from the City Attorney.
7. Community Development
CONSIDERATION OF A PREFERRED VENDOR LIST FOR ON-CALL PROFESSIONAL
GRAPHIC DESIGN, PRINTING, AND MAILING SERVICES
Recommendation: Staff respectfully recommend that the City Council: 1) Approve the proposed preferred vendor list for on-call professional graphic design, printing, and mailing services for a period of three (3) years, with an option for two (2) one-year extensions; 2) Authorize the City Manager or their designee to utilize the graphic design, printing, and mailing services of each of the service providers on the approved list; 3) Authorize the City Manager or their designee to execute contracts with each service provider and undertake any and all actions necessary to implement the contracts; 4) Authorize the City Manager or their designee to execute nonsubstantive changes and modifications, with approval from the City Attorney; and 5) Authorize the City Manager or their designee to extend the contract term and adjust compensation within the limits of the Council-approved budget as needed.
8. Community Development
CONSIDERATION OF RESOLUTION 26-68 ACCEPTING PUBLIC IMPROVEMENTS FOR NEWPORT ESTATES UNIT 13 (SUBDIVISION NO. 5142)
Recommendation: Staff respectfully recommends that the City Council adopt Resolution 26-68 accepting public improvements within Newport Estates Unit 13 (Subdivision No. 5142) including 3 water, sewer, storm drain, streetlight, and roadway improvements, Community Facilities District (CFD) landscaping, and irrigation. This acceptance would exclude street trees.
9. Community Development
CONSIDERATION OF RESOLUTION 26-79 AUTHORIZING APPLICATIONS FOR GRANT FUNDING FROM THE SACRAMENTO AREA COUNCIL OF GOVERNMENTS 2026 FEDERAL
FUNDING CYCLE PROGRAMS
Recommendation: Staff respectfully recommend that the City Council adopt Resolution 26-79: 1) Authorizing applications for grant funding through the SACOG 2026 Federal Funding Cycle Programs; 2) Approving the City’s SACOG 2026 Federal Funding Cycle Programs application priorities; 3) Authorizing City staff to make non-substantive changes or modifications to the Federal Funding Cycle Program application priorities, with approval from the City Manager; and 4) Authorizing the City Manager or their designee to execute all required grant documents and ensure timely project delivery.
10. Finance
CONSIDERATION OF RESOLUTION 26-72 ESTABLISHING APPROPRIATIONS LIMIT FOR FISCAL YEAR 2026/27
Recommendation: Staff respectfully recommends that the City Council adopt Resolution 26-72 establishing an Appropriations Limit for Fiscal Year 2026/27.
11. Finance
CONSIDERATION AND ADOPTION OF RESOLUTION 26-73 APPROVING THE FINANCING OF CERTAIN FIRE APPARATUS AND DECLARING THE CITY’S INTENT TO REIMBURSE ITSELF
FROM THE PROCEEDS OF DEBT FOR CERTAIN EXPENDITURES
Recommendation: Staff respectfully recommends that the City Council: 1) Authorize the Finance Director or designee to accept a proposed equipment lease, and to enter into a lease-purchase agreement with JP Morgan Chase Bank to finance the purchase of the fire apparatus and equipment in the amount of $2,482,875.04; and 2) Adopt Resolution 26-73 approving the financing of two Type 1 Fire Pumpers and declaring the City’s intent to reimburse itself from the proceeds of debt for certain expenditures.
12. Finance
CONSIDERATION OF THE TREASURER’S QUARTERLY FINANCIAL REPORT ON THE CITY’S INVESTMENT PORTFOLIO FOR THE PERIOD ENDING MARCH 31, 2026 AND ANNUAL UPDATES TO THE CITY’S INVESTMENT POLICY
Recommendation: Staff respectfully recommends that the City Council receive and file the Treasurer’s Quarterly Financial Report on the City’s investment portfolio for the period ending March 31, 2026, and approve the recommended changes to the City’s investment policy.
13. Fire
CONSIDERATION OF APPROVAL OF A PREFERRED VENDOR LIST FOR FIRE VEHICLE
PREVENTATIVE MAINTENANCE AND REPAIRS
Recommendation: Staff respectfully recommends that City Council: 1) Approve the Preferred Vendor List for a period of three (3) years with an option to extend for two (2) one-year extensions; 2) Authorize the City Manager or their designee to undertake any and all actions necessary to implement the contracts; 3) Authorize the City Manager or their designee to execute nonsubstantive changes and modifications, with approval from the City Attorney; and 4) Authorize the City Manager or their designee to extend the contract term and adjust compensation, within the limits of the Council-approved budget as needed. 4
14. Parks & Recreation
CONSIDERATION OF RESOLUTION 26-71 APPROVING THE APPLICATION FOR STATEWIDE
PARK DEVELOPMENT AND COMMUNITY REVITALIZATION PROGRAM GRANT FUNDS FOR
THE MEADOWDALE PARK RENOVATION AND EXPANSION PROJECT
Recommendation: Staff respectfully recommends that the City Council adopt Resolution 26-71 approving an application to California State Park for the Statewide Park Development and Community Revitalization Grant Program to fund the Meadowdale Park Renovation and Expansion Project.
15. Public Works
CONSIDERATION OF CONTRACT WITH INTECH MECHANICAL COMPANY, INC., FOR ONCALL HEATING, VENTILATION, AND AIR CONDITIONING SERVICES AT CITY FACILITIES Recommendation: Staff respectfully recommends that the City Council: 1) Award a contract for on-call HVAC services at City facilities to Intech Mechanical Company, Inc. and authorize the City Manager or his designee to execute the contract; 2) Authorize the City Manager or his designee to execute non-substantive changes or modifications to the Contract for Services with approval from the City Attorney; 3) Authorize the City Manager or his designee to execute amendments or change orders up to the Council approved budget; and 4) Authorize the City Manager or his designee to execute amendments to extend the term of the contract.
16. Public Works
CONSIDERATION OF CONTRACT FOR SERVICES WITH PROCESS MEASUREMENT GROUP
DBA TOLEDO INDUSTRIAL COATINGS FOR CAUSTIC CONTAINMENT PAINTING AT THE
WATER TREATMENT PLANT
Recommendation: Staff respectfully recommends that the City Council: 1. Award a contract to perform caustic containment painting to Process Measurement Group dba Toledo Industrial Coatings in the amount of $97,973.70 and authorize the City Manager or his designee to execute the contract; 2. Authorize the City Manager or his designee to execute non-substantive changes or modifications to the Contract with approval from the City Attorney; 3. Authorize the City Manager or his designee to execute amendments or change orders up 10% of the contract value (9,797.38); and 4. Authorize the City Manager or his designee to execute amendments to extend the term of the contract.
17. City Manager's Office
CONSIDERATION OF APPROVAL OF THE MINUTES OF THE AUGUST 5, 2026 REGULAR
MEETING OF THE WEST SACRAMENTO CITY COUNCIL, REDEVELOPMENT SUCCESSOR
AGENCY, AND WEST SACRAMENTO FINANCING AUTHORITY
Recommendation: Staff respectfully recommends that the City Council approve the minutes of the August 5, 2026 Regular Meeting of the West Sacramento City Council, Redevelopment Successor Agency, and West Sacramento Financing Authority.
18. City Manager's Office
CONSIDERATION OF RESPONSE TO YOLO COUNTY GRAND JURY REPORT ON UNIFIED ACTION: STRENGTHENING THE YOLO COUNTY HOMELESSNESS RESPONSE Recommendation: Staff respectfully recommends that the City Council review and authorize the attached response to the Yolo County Grand Jury report titled “ Unified Action: Strengthening the Yolo County Homelessness Response”.
PUBLIC HEARINGS 5
19. Community Development
PUBLIC HEARING AND FIRST READING OF ORDINANCE 26-57 FOR PROPOSED THIRD
AMENDMENT TO THE RIVER PARK DEVELOPMENT AGREEMENT TO EXTEND THE TERM
OF THE AGREEMENT
Recommendation: Staff respectfully recommends that the Council: 1) Conduct the public hearing; 2) Waive first reading and read by title and number only, of Ordinance 26-57 (Attachment 1) regarding a proposed third amendment to a Development Agreement (“DA Amendment”) with River Park; and 3) Inform the audience that the second reading and adoption of Ordinance 26-57, is tentatively scheduled for September 9, 2026.
REGULAR AGENDA
20. Community Development
WORKSHOP ON PROPOSED CONTRACT FOR SERVICES WITH GREENWASTE RECOVERY,
LLC FOR EXCLUSIVE SOLID WASTE COLLECTION
Recommendation: Staff respectfully recommends that the City Council conduct a workshop to provide feedback and comments on and to receive feedback and comments from the community on the proposed contract with GreenWaste Recovery, LLC to provide exclusive solid waste collection services. Based on feedback, Staff will return with an item at a future meeting for consideration of the contract.
GENERAL ADMINISTRATION FUNCTION – PART II
21. COUNCIL COMMUNICATIONS / ASSIGNMENTS
22. PART II
A. Council Calendar
B. City Manager Report
C. City Attorney Report
D. Staff Direction from City Council Members
E. Future Agenda Item Requests by Council
(i) Request to consider adding a proclamation recognizing the International Day of Peace to a future City Council meeting agenda. (Guerrero)
F. Adjourn
I, Jennifer Cusmir, City Clerk, declare under penalty of perjury that the foregoing agenda for the August 19, 2026 regular and closed session meetings of the West Sacramento City Council, Redevelopment Successor Agency and Financing Authority was posted August 14, 2026 at the rear entrance at City Hall, 1110 West Capitol Avenue, West Sacramento, CA and was available for public review. __________________________________________
Jennifer Cusmir, City Clerk
6 City Hall, Council Chambers cityofwestsacramento.org
1110 West Capitol Avenue, 2nd Floor
Los documentos se traducen usando software de AI.
La ciudad de West Sacramento da la bienvenida a tu participación.
Las agendas de las reuniones del Ayuntamiento se publican tanto en inglés como en español.
Horario de reuniones: Las reuniones ordinarias del Ayuntamiento se celebran el primer y tercer miércoles de cada mes a las 19:00 horas. Por favor, revise el calendario de reuniones en línea para ver si hay posibles cambios en el calendario.
Comentario presencial sobre los puntos del orden del día: Envía una tarjeta de solicitud de diálogo con el Secretario Municipal antes de que concluya el periodo de comentarios públicos o antes de la conclusión de la presentación del personal sobre el punto que deseas hacer. Cada orador dispone de tres (3) minutos para dirigirse al Consejo, salvo que el alcalde amplíe el tiempo máximo permitido. El periodo de comentarios presenciales concluirá antes de que comience el comentario público virtual. No se escucharán comentarios adicionales en persona sobre un tema tras la conclusión del periodo de comentarios presenciales.
Comentarios públicos remotos sobre los puntos de la agenda: Los miembros del público pueden participar de forma remota vía Zoom, como se indica a continuación. Los oradores que deseen ofrecer comentarios públicos deben levantar la mano virtual cuando el secretario municipal lo solicite. Los miembros del público que participan por teléfono pueden levantar la mano para comentar pulsando *9. Cada orador dispone de tres (3) minutos para dirigirse al Consejo, salvo que el alcalde amplíe el tiempo máximo permitido. El periodo de comentarios a distancia terminará cuando el último altavoz remoto termine de hablar. Participación remota: www.zoom.com / Teléfono: 530-222-1234 o 829-456-9874 ID de la reunión: 123 456 789
Los oradores públicos, tanto presenciales como remotos, no pueden compartir vídeos o ayudas visuales (i.e. pdf, ppt, documentos) durante su periodo de comentarios.
Ley Brown: Según la ley estatal, la Ciudad Coucnil tiene prohibido discutir o actuar sobre cualquier asunto que no esté en la agenda.
Disposiciones de la Ley Levine: Cualquier parte de un permiso, licencia, contrato (excepto contratos de licitación competitiva, laborales o laborales personales) u otro derecho ante el Consejo está obligada a declarar en el registro cualquier contribución, incluidas las aportaciones agregadas, de más de 500 dólares realizada por el partido o sus representantes en los 12 meses anteriores a cualquier miembro del Consejo. Se solicita a los participantes y agentes que también hagan esta divulgación. La divulgación debe incluir el nombre de la parte o participante y de cualquier otra persona que haya realizado la contribución, el nombre del destinatario, la cantidad de la contribución y la fecha en que se realizó la contribución.
Ley de Estadounidenses con Discapacidades: Si se requiere asistencia especial para participar en una reunión, incluyendo la necesidad de ayudas auxiliares o servicios de traducción, por favor notifique a la Oficina del Secretario Municipal con al menos 72 horas de antelación a la reunión. Secretario Municipal 1110 West Capitol Avenue, [email protected]
Agendas traducidas: Puede solicitar una o varios puntos traducidos incluidos en el paquete contactando con el Secretario Municipal con 72 horas de antelación a la reunión. Secretario de la Ciudad, 1110 West Capitol Avenue, [email protected]
Medidas de seguridad: Todos los asistentes a la reunión deben pasar con éxito la seguridad. Cualquier persona con un objeto prohibido no se permitirá la entrada. Los objetos prohibidos incluyen, pero no se limitan a, armas de fuego (incluso
con CCW válido), cuchillos, spray de pimienta/gas pimienta, explosivos de cualquier tipo/cualquier arma y/o dispositivos peligrosos de
cualquier tipo, drogas ilegales y alcohol.
Opciones de visualización: La ciudad de West Sacramento ofrece múltiples opciones para las reuniones de visionado:
• Presencial -
• En línea a través de Zoom o YouTube www.youtube.com/@cityofwestsac • Se emite en directo en Wave Cable Canal 20 y se reemite al día siguiente a las 12:00 p.m. y el sábado siguiente a las 6:00 p.m.
7 Martha Guerrero, Mayor
Verna Sulpizio Hull, Mayor Pro Tem
Quirina Orozco, Councilmember
Norma Alcala, Councilmember
Dawnte Early, Councilmember
Aaron Laurel, City Manager
Jeff Mitchell, City Attorney
Para solicitar que se traduzcan más documentos de la agenda al español, por favor envía tu solicitud a la Oficina del Secretario de la Ciudad en [email protected] AGENDA
REUNIÓN ORDINARIA DEL AYUNTAMIENTO DE WEST SACRAMENTO Y AGENCIA SUCESORA DE REURBANIZACIÓN DE WEST SACRAMENTO Y AUTORIDAD DE FINANCIACIÓN DE
WEST SACRAMENTO
AUGUST 19, 2026
Reunion Ordinaria 7:00 PM
AYUNTAMIENTO
1110 WEST CAPITOL AVENUE, 2ND FLOOR, ROOM 238
I. LLAMADA AL ORDEN
II. JURAMENTO A LA BANDERA
III. RECONOCIMIENTO DE TIERRAS
IV. PROCEDIMIENTOS DE LA REUNIÓN
FUNCIÓN DE ADMINISTRACIÓN GENERAL – PARTE
1. COMENTARIOS PÚBLICOS SOBRE ASUNTOS QUE NO ESTÉN EN LA AGENDA DENTRO DE LA JURISDICCIÓN DEL CONSEJO
PRESENTACIONES
2. Oficina del Gerente de la Ciudad
PRESENTACIÓN DE LA PROCLAMACIÓN QUE RECONOCE EL PROGRAMA FEMENINO DE SÓFTBOL DE WEST SACRAMENTO
Recomendación: El personal recomienda respetuosamente que el Ayuntamiento adopte la proclamación que reconoce el programa de sófbol femenino de West Sacramento por su impacto positivo en el desarrollo juvenil, la participación comunitaria y sus logros recientes.
3. Oficina del Gerente de la Ciudad
PROCLAMACIÓN DEL AYUNTAMIENTO DE LA CIUDAD DE WEST SACRAMENTO RECONOCIENDO A ELIZABETH "LIZZY" SPINK
Recomendación: El personal recomienda respetuosamente que el Ayuntamiento adopte la proclamación adjunta que reconoce a Lizzy Spink.
AGENDA DE CONSENTIMIENT
4. Proyectos de Capital
CONSIDERACIÓN DE LA RESOLUCIÓN 26-77 QUE DELEGA AUTORIDAD AL
ADMINISTRADOR MUNICIPAL PARA LLEVAR A CABO CIERTAS ACCIONES PARA INICIAR Y COMPLETAR TRANSACCIONES DE BIENES INMUEBLES Y CONSIDERACIÓN DE LA ENMIENDA DEL CONTRATO Nº 1 CON WOOD RODGERS, INC. PARA EL PROYECTO COMPLETO DE LA CALLE NORTH 5TH STREET (CIP 16013)
Recomendación: El personal recomienda respetuosamente que el Ayuntamiento: 1) Adopte la Resolución 26-77, delegando autoridad al Gerente Municipal para llevar a cabo ciertas acciones para iniciar y completar todas las transacciones de bienes inmuebles del Proyecto (Anexo 1); 2) Aprobar y autorizar al Gerente de la Ciudad, o a su designado, a ejecutar la Enmienda nº 1 (Anexo 3) al contrato de servicios profesionales con Wood Rodgers, Inc. por un importe de 203.601,74 dólares; 3) Autorizar al Gerente de la Ciudad, o a su representante, a realizar cambios o modificaciones no sustantivas, con la aprobación del Abogado de la Ciudad; y 4) Autorizar al 8 Gerente de la Ciudad, o a su representante, a ejecutar enmiendas para ampliar aún más el plazo del contrato, si es necesario.
5. Proyectos de Capital
CONSIDERACIÓN DE LA APROBACIÓN DE UN CONTRATO DE SERVICIOS
PROFESIONALES CON SCHAAF & WHEELER PARA SERVICIOS PROFESIONALES DE INGENIERÍA PARA EL PROYECTO DE REHABILITACIÓN DE LA ESTACIÓN DE BOMBEO DE ALCANTARILLADO DE BRYTE (CIP 33031)
Recomendación: El personal recomienda respetuosamente que el Ayuntamiento: 1. Adjudice un contrato de servicios profesionales con Schaaf & Wheeler para servicios de ingeniería para el Proyecto de Rehabilitación de la Estación de Bombeo de Alcantarillado de Bryte (CIP 33031); 2.
Autorizar al Gerente de la Ciudad, o a su representado, a firmar un contrato de servicios profesionales con Schaaf & Wheeler por una cantidad que no exceda los 1.001.540 dólares, que incluya cualquier tarea opcional; 3. Delegar autoridad al Gerente de la Ciudad, o a su designado, para autorizar cualquier tarea opcional. Las tareas opcionales seguirán siendo opcionales salvo y hasta que se autorice expresamente por escrito; 4. Autorizar al Gerente Municipal o a su representante a realizar enmiendas contractuales de hasta el 10% (100.154 $) del valor total del contrato; 5. Autorizar al Gerente de la Ciudad, o a su representante, a realizar cambios o modificaciones no sustantivas en este contrato de servicios profesionales, con la aprobación del Abogado de la Ciudad; y 6. Autorizar al Gerente Municipal, o a su representante, a ejecutar enmiendas para extender el plazo de este contrato, si es necesario.
6. Desarrollo Comunitario
CONSIDERACIÓN DE LA APROBACIÓN DE UN CONTRATO DE SERVICIOS PROFESIONALES CON WSP USA, INC. PARA SERVICIOS TÉCNICOS DE PLANIFICACIÓN DEL TRANSPORTE Y PREPARACIÓN DEL PLAN PRIORITARIO DE TRANSPORTE FUTURO DE WEST SAC (CIP 12022)
Recomendación: El personal recomienda respetuosamente que el Ayuntamiento: 1) Autorice al Gerente Municipal, o a su designado, a firmar un acuerdo de servicios profesionales con WSP USA, INC. (WSP) para servicios técnicos de planificación del transporte (CIP 12022), por una cantidad que no exceda los 847.578 dólares; 2) Autorizar al Gerente Municipal, o a su representante, a realizar enmiendas contractuales de hasta 85.000 dólares del valor total del contrato; y 3) Autorizar al Gerente de la Ciudad, o a su representante, a ejecutar cambios o modificaciones administrativas no sustantivas al contrato de servicios, con la aprobación del Abogado de la Ciudad.
7. Desarrollo Comunitario
CONSIDERACIÓN DE UNA LISTA DE PROVEEDORES PREFERIDOS PARA SERVICIOS PROFESIONALES DE DISEÑO GRÁFICO, IMPRESIÓN Y ENVÍO POSTAL DISPONIBLES Recomendación: El personal recomienda respetuosamente que el Ayuntamiento: 1) Apruebe la lista propuesta de proveedores preferidos para servicios profesionales de diseño gráfico, impresión y envío postal durante un periodo de tres (3) años, con opción de dos (2) prórrogas de un año; 2) Autorizar al Gerente Municipal o a su representante a utilizar los servicios de diseño gráfico, impresión y envío postal de cada uno de los proveedores de servicios de la lista aprobada; 3) Autorizar al Gerente Municipal o a su representante a firmar contratos con cada proveedor de servicios y a llevar a cabo todas las acciones necesarias para implementar dichos contratos; 4) Autorizar al Gerente Municipal o a su representante a ejecutar cambios y modificaciones no sustantivas, con la aprobación del Abogado de la Ciudad; y 5) Autorizar al Gerente Municipal o a su representante a prorrogar el plazo del contrato y ajustar la compensación dentro de los límites del presupuesto aprobado por el Ayuntamiento según sea necesario.
8. Desarrollo Comunitario
CONSIDERACIÓN DE LA RESOLUCIÓN 26-68 QUE ACEPTA MEJORAS PÚBLICAS PARA LA UNIDAD 13 DE NEWPORT ESTATES (SUBDIVISIÓN Nº 5142)
Recomendación: El personal recomienda respetuosamente que el Ayuntamiento adopte la Resolución 26-68 que acepta mejoras públicas dentro de la Unidad 13 de Newport Estates (Subdivisión nº 5142) incluyendo mejoras en el agua, alcantarillado, drenaje pluvial, alumbrado 9 público y carreteras, paisajismo del Distrito de Instalaciones Comunitarias (CFD) y riego. Esta aceptación excluiría los árboles de la calle.
9. Desarrollo Comunitario
CONSIDERACIÓN DE LA RESOLUCIÓN 26-79 QUE AUTORIZA SOLICITUDES DE FINANCIACIÓN POR SUBVENCIÓN DEL CONSEJO DEL ÁREA DE GOBIERNOS DE SACRAMENTO PROGRAMAS DEL CICLO FEDERAL DE FINANCIACIÓN 2026 Recomendación: El personal recomienda respetuosamente que el Ayuntamiento adopte la Resolución 26-79: 1) Autorización de solicitudes de financiación por subvención a través de los Programas del Ciclo Federal de Financiación SACOG 2026; 2) Aprobar las prioridades de solicitud de los Programas del Ciclo Federal de Financiación SACOG 2026 de la ciudad; 3) Autorizar al personal municipal a realizar cambios o modificaciones no sustantivas en las prioridades de solicitud del Programa del Ciclo Federal de Financiación, con la aprobación del Gerente Municipal; y 4) Autorizar al Gerente Municipal o a su representante a ejecutar todos los documentos de subvención requeridos y garantizar la entrega puntual del proyecto.
10. Finanzas
CONSIDERACIÓN DE LA RESOLUCIÓN 26-72 QUE ESTABLECE EL LÍMITE DE ASIGNACIONES PARA EL AÑO FISCAL 2026/27
Recomendación: El personal recomienda respetuosamente que el Ayuntamiento adopte la Resolución 26-72 estableciendo un Límite de Asignaciones para el Año Fiscal 2026/27.
11. Finanzas
CONSIDERACIÓN Y ADOPCIÓN DE LA RESOLUCIÓN 26-73 QUE APRUEBA LA FINANCIACIÓN DE CIERTOS VEHÍCULOS DE BOMBEROS Y DECLARA LA INTENCIÓN DE
LA CIUDAD DE REEMBOLSARSE CON LOS INGRESOS DE LA DEUDA POR CIERTOS GASTOS
Recomendación: El personal recomienda respetuosamente que el Ayuntamiento: 1) autorice al Director Financiero o al representante a aceptar un arrendamiento propuesto de equipo y a celebrar un contrato de arrendamiento con JP Morgan Chase Bank para financiar la compra del vehículo y equipo de bomberos por un importe de $2,482,875,04; y 2) Adoptar la Resolución 26- 73 aprobando la financiación de dos bomberos tipo 1 y declarando la intención de la ciudad de reembolsarse con los ingresos de la deuda por ciertos gastos.
12. Finanzas
CONSIDERACIÓN DEL INFORME FINANCIERO TRIMESTRAL DEL TESORERO SOBRE LA CARTERA DE INVERSIONES DE LA CIUDAD PARA EL PERIODO QUE FINALIZA EL 31 DE MARZO DE 2026 Y LAS ACTUALIZACIONES ANUALES DE LA POLÍTICA DE INVERSIONES
DE LA CIUDAD
Recomendación: El personal recomienda respetuosamente que el Ayuntamiento reciba y presente el Informe Financiero Trimestral del Tesorero sobre la cartera de inversiones de la Ciudad para el periodo que finaliza el 31 de marzo de 2026 y apruebe los cambios recomendados en la política de inversiones de la Ciudad.
13. Incendio
CONSIDERACIÓN DE LA APROBACIÓN DE UNA LISTA DE PROVEEDORES PREFERIDOS PARA EL MANTENIMIENTO PREVENTIVO Y REPARACIONES DE VEHÍCULOS DE
BOMBEROS
Recomendación: El personal recomienda respetuosamente que el Ayuntamiento: 1) Apruebe la Lista de Proveedores Preferidos por un periodo de tres (3) años con opción a prorrogar dos (2) extensiones de un año; 2) Autorizar al Gerente Municipal o a su representante a llevar a cabo todas las acciones necesarias para implementar los contratos; 3) Autorizar al Gerente Municipal o a su representante a ejecutar cambios y modificaciones no sustantivas, con la aprobación del Abogado de la Ciudad; y 4) Autorizar al Gerente Municipal o a su representante a prorrogar el plazo del contrato y ajustar la compensación, dentro de los límites del presupuesto aprobado por el Ayuntamiento según sea necesario. 10
14. Parques y Recreación
CONSIDERACIÓN DE LA RESOLUCIÓN 26-71 QUE APRUEBA LA SOLICITUD DE FONDOS ESTATALES PARA EL DESARROLLO DE PARQUES Y EL PROGRAMA DE REVITALIZACIÓN COMUNITARIA PARA EL PROYECTO DE RENOVACIÓN Y AMPLIACIÓN DE MEADOWDALE PARK
Recomendación: El personal recomienda respetuosamente que el Ayuntamiento adopte la Resolución 26-71 que apruebe una solicitud al Parque Estatal de California para el Programa de Subvenciones para el Desarrollo y Revitalización Comunitaria de Parques Estatales para financiar el Proyecto de Renovación y Ampliación del Parque Meadowdale.
15. Obras públicas
CONSIDERACIÓN DE UN CONTRATO CON INTECH MECHANICAL COMPANY, INC., PARA SERVICIOS DE CALEFACCIÓN, VENTILACIÓN Y AIRE ACONDICIONADO A LA VENTA EN
LAS INSTALACIONES DE LA CIUDAD
Recomendación: El personal recomienda respetuosamente que el Ayuntamiento: 1) Adjudice un contrato para servicios HVAC de guardia en las instalaciones municipales a Intech Mechanical Company, Inc. y autorice al Gerente Municipal o a su representante a ejecutar el contrato; 2) Autorizar al Gerente Municipal o a su representante a ejecutar cambios o modificaciones no sustantivas al Contrato de Servicios con la aprobación del Abogado de la Ciudad; 3) Autorizar al Gerente de la Ciudad o a su representante a ejecutar enmiendas o órdenes de cambio hasta el presupuesto aprobado por el Consejo; y 4) Autorizar al Gerente Municipal o a su representante a ejecutar enmiendas para extender el plazo del contrato.
16. Obras públicas
CONSIDERACIÓN DE UN CONTRATO DE SERVICIOS CON PROCESS MEASUREMENT
GROUP DBA TOLEDO INDUSTRIAL COATINGS FOR CAUSTIC CONTAINMENT PAINTING IN
THE WATER PLANT
Recomendación: El personal recomienda respetuosamente que el Ayuntamiento: 1. Adjudice un contrato para realizar pintura de contención cáustica a Process Measurement Group, dba Toledo Industrial Coatings, por un importe de 97.973,70 dólares y autorice al Gerente Municipal o a su representante a ejecutar el contrato; 2. Autorizar al Gerente Municipal o a su representante a realizar cambios o modificaciones no sustantivas al Contrato con la aprobación del Abogado de la Ciudad; 3. Autorizar al Gerente Municipal o a su representante a ejecutar enmiendas u órdenes de modificación hasta el 10% del valor del contrato (9.797,38); y 4. Autorizar al Gerente Municipal o a su representante a ejecutar enmiendas para extender el plazo del contrato.
17. Oficina del Gerente de la Ciudad
CONSIDERACIÓN DE LA APROBACIÓN DE LAS ACTAS DE LA REUNIÓN ORDINARIA DEL 5 DE AGOSTO DE 2026 DEL AYUNTAMIENTO DE WEST SACRAMENTO, LA AGENCIA SUCESORA DE REURBANIZACIÓN Y LA AUTORIDAD DE FINANCIACIÓN DE WEST
SACRAMENTO
Recomendación: El personal recomienda respetuosamente que el Ayuntamiento apruebe las actas de la Reunión Ordinaria del 5 de agosto de 2026 del Ayuntamiento de West Sacramento, la Agencia Sucesora de Reurbanización y la Autoridad de Financiación de West Sacramento.
18. Oficina del Gerente de la Ciudad
CONSIDERACIÓN DE LA RESPUESTA AL INFORME DEL GRAN JURADO DEL CONDADO DE YOLO SOBRE ACCIÓN UNIFICADA: FORTALECIMIENTO DE LA RESPUESTA ANTE LA
FALTA DE VIVIENDA DEL CONDADO DE YOLO
Recomendación: El personal recomienda respetuosamente que el Ayuntamiento revise y autorice la respuesta adjunta al informe del Gran Jurado del Condado de Yolo titulado "Acción Unificada: Fortaleciendo la Respuesta a la Falta de Vivienda del Condado de Yolo". 11 AUDIENCIAS PÚBLICAS
19. Desarrollo Comunitario
AUDIENCIA PÚBLICA Y PRIMERA LECTURA DE LA ORDENANZA 26-57 PARA LA
PROPUESTA DE TERCERA ENMIENDA AL ACUERDO DE DESARROLLO DE RIVER PARK
PARA EXTENDER EL PLAZO DEL ACUERDO
Recomendación: El personal recomienda respetuosamente que el Consejo: 1) Celebre la audiencia pública; 2) Renunciar a la primera lectura y leerla solo por título y número, de la Ordenanza 26-57 (Anexo 1) relativa a una propuesta de tercera enmienda a un Acuerdo de Desarrollo ("Enmienda DA") con River Park; y 3) Informar a la audiencia de que la segunda lectura y adopción de la Ordenanza 26-57 está provisionalmente programada para el 9 de septiembre de 2026.
AGENDA ORDINARIA
20. Desarrollo Comunitario
TALLER SOBRE EL CONTRATO PROPUESTO PARA SERVICIOS CON GREENWASTE RECOVERY, LLC PARA LA RECOGIDA EXCLUSIVA DE RESIDUOS SÓLIDOS Recomendación: El personal recomienda respetuosamente que el Ayuntamiento realice un taller para proporcionar comentarios y comentarios y recibir comentarios de la comunidad sobre el contrato propuesto con GreenWaste Recovery, LLC para ofrecer servicios exclusivos de recogida de residuos sólidos. Según los comentarios, el personal volverá con un punto en una reunión futura para la consideración del contrato.
FUNCIÓN DE ADMINISTRACIÓN GENERAL – PARTE II
21. COMUNICACIONES DEL CONCEJO / INFORMES SOBRE ASIGNACIONES A JUNTAS, COMITÉS O COMISIONES REGIONALES
22. PARTE II
A. Calendario del Consejo
B. Informe del Director Municipal
C. Informe del abogado municipal
D. Dirección del personal de los miembros del Ayuntamiento E. Solicitudes de puntos del Orden del Día por parte del Consejo (i) Solicitud para considerar añadir una proclamación que reconozca el Día Internacional de la Paz a la agenda de una futura reunión del Ayuntamiento. (Guerrero) F. Levantamiento de la sesión
Yo, Jennifer Cusmir, Secretaria Municipal, declaro bajo pena de perjurio que la agenda anterior para la August 19, 2026 El aviso de las reuniones ordinarias y a puerta cerrada del Concejo Municipal de West Sacramento, de la Agencia Sucesora de Reurbanización y de la Autoridad de Financiamiento se publicó el 14 de agosto de 2026 en la oficina de la Secretaria Municipal, ubicada en 1110 West Capitol Avenue, West Sacramento, CA, y estuvo a disposición del público para su consulta.
_________________________________________________________________________ Jennifer Cusmir, Secretaria Municipal
12 CITY COUNCIL AGENDA REPORT
MEETING DATE: August 19, 2026 ITEM # 2
SUBJECT:
PRESENTATION OF PROCLAMATION OF THE WEST SACRAMENTO
CITY COUNCIL RECOGNIZING THE 2026 WEST SACRAMENTO GIRLS SOFTBALL (WSGS) SELECT PROGRAM, INCLUSIVE OF 10U, 12U AND 14U AGE DIVISIONS
INITIATED OR REQUESTED BY: REPORT COORDINATED OR PREPARED BY:
[ X ] Council [ ] Staff Lewis, Public Information Officer City Manager’s Office
[ ] Other
ATTACHMENT [ X ] Yes [ ] No [ ] Information [ ] Direction [ X ] Action
OBJECTIVE
The purpose of this proclamation is to recognize the West Sacramento Girls Softball Program.
RECOMMENDED ACTION
Staff respectfully recommends that the City Council adopt the proclamation recognizing the West Sacramento Girls Softball program for its positive impact on youth development, community engagement, and recent achievement.
BACKGROUND
The West Sacramento Girls Softball Program is a prominent local sports organization affiliated with United States Softball. It offers girls ages 7 to 14 the opportunity to participate in organized softball, encouraging them to develop athletic skills, teamwork and resilience. The program aligns with the City of West Sacramento’s values of community enrichment and youth development, playing a significant role in empowering young athletes through sports. A well supported environment for its athletes is made possible by the partnership among the softball program, the Washington Unified School District, local businesses and city partners. Collaborators include the City’s Parks and Recreation Department, All American Softball and River City High School, whose staff and facilities have been instrumental in the program’s success. During the 2026 season, support from more than 70 volunteers and 29 sponsors enabled girls to participate, reinforcing the community’s dedication to fostering youth sports.
ANALYSIS
The West Sacramento Girls Softball Program has demonstrated a strong commitment to enhancing girls’ athletics, with achievements that bring pride to West Sacramento. The program’s success is a testament to the dedication of its players, the support of families and friends, and the program’s partnership with the City’s Parks and Recreation Department and the Washington Unified School District for field scheduling and maintenance at the Alice Norman-Bryte Playfields. Adoption of this proclamation will publicly acknowledge the program’s role in promoting girls’ sports in West Sacramento and honor the achievements of its players and supporters.
Environmental Considerations
N/A
Commission Recommendation
N/A
Strategic Plan Integration
This proclamation supports the City’s goal of creating an inclusive and diverse environment.
Alternatives
N/A
Coordination and Review
Staff and West Sacramento Girls Softball.
Budget/Cost Impact
N/A
ATTACHMENT
Proclamation
13 PROCLAMATION OF THE WEST SACRAMENTO CITY COUNCIL
RECOGNIZING THE 2026 WEST SACRAMENTO GIRLS SOFTBALL (WSGS) SELECT PROGRAM, INCLUSIVE OF 10U, 12U AND 14U AGE DIVISIONS
WHEREAS, WSGS program is a member of USA Softball organization and provides opportunities for girls in West Sacramento to develop softball skills, sportsmanship, and leadership through organized athletic competition; and
WHEREAS, WSGS works in partnership with the Washington Unified School District, Yolo County, the City of West Sacramento, River City High School, local businesses and community organizations to create an exceptional athletic program that enriches the lives of youth athletes and foster community involvement; and
WHEREAS, WSGS is supported by more than 50 volunteers, 25+ sponsors whose continued support enables girls to participate in the 2026 season, demonstrating the community’s commitment to youth sports and positive development; and
WHEREAS, the 10u West Sac Legends finished second place in the Swing into Select tournament, second place in the USA Softball Association Tournament which earned a berth to the Tournament of Champions in San Diego and placed first in the Davis Stars and Strikes tournament.
This team demonstrated their hard work, grit and team throughout the season; and WHEREAS, the 12u West Sac Legends ended their season with a second-place finish in the PHBA Field of Dreams tournament; and
WHEREAS, the 14u West Sac Legends finished second place at the Stars of Cordova tournament. The team’s hard work also earned them a berth to the Tournament of Champions in San Diego.
NOW, THEREFORE, BE IT PROCLAIMED that the City Council of West Sacramento hereby congratulates the 2026 WSGS Select program on their accomplishments and recognizes the WSGS program for its commitment of empowering youth athletes and strengthening the community through youth sports.
PROCLAIMED THIS 19TH day of August 2026.
ATTEST:
______________________________________ ______________________________________ Martha Guerreo, Mayor Jennifer Cusmir, City Clerk
14 CITY OF WEST SACRAMENTO
ERRATA MEMORANDUM
TO: Mayor Guerrero and City Council Members
FROM: Jennifer Cusmir, City Clerk
CC: Aaron Laurel, City Manager
Amanda Berlin, Assistant City Manager
Ariana Adame, Assistant City Manager
Doug Drozd, Deputy City Manager
Jeff Mitchell, City Attorney
DATE: August 19, 2026
SUBJECT: City Council Meeting Agenda – Item # 2 PRESENTATION OF PROCLAMATION OF THE WEST SACRAMENTO CITY COUNCIL RECOGNIZING THE 2026
WEST SACRAMENTO GIRLS SOFTBALL (WSGS) SELECT PROGRAM,
INCLUSIVE OF 10U, 12U AND 14U AGE DIVISIONS
Item 2 is being removed from the August 19 agenda and has been rescheduled for the September 9, 2026 City Council Meeting.
Thank you.
15 CITY COUNCIL AGENDA REPORT
MEETING DATE: August 19, 2026 ITEM # 3
SUBJECT:
PROCLAMATION OF THE CITY OF WEST SACRAMENTO CITY COUNCIL RECOGNIZING ELIZABETH “LIZZY” SPINK
INITIATED OR REQUESTED BY: REPORT COORDINATED OR PREPARED BY:
[ X ] Council [ ] Staff Lanaya Lewis, Public Information Officer City Manager’s Office
[ ] Other
ATTACHMENT [ X ] Yes [ ] No [ ] Information [ ] Direction [ X ] Action
OBJECTIVE
The purpose of this proclamation is to recognize the heroic effort and selfless actions of Elizabeth “Lizzy” Spink.
RECOMMENDED ACTION
Staff respectfully recommend that the City Council adopt the attached proclamation recognizing Lizzy Spink.
BACKGROUND
In late October 2025, the West Sacramento Fire Department responded to a middle school campus following a science laboratory accident involving two students. A flammable liquid ignited and was forced from an openended vessel, reaching the clothes and heads of two students during the experiment.
Elizabeth “Lizzy” Spink, a 14-year-old eighth-grade student, responded to help one of the impacted students.
She removed the student’s burning jacket, then extinguished the remaining flames. She provided additional assistance consistent with basic burn response practices.
West Sacramento Fire Captain Mike Rios noted, after reviewing video footage of the emergency, that Lizzy’s response was prompt, and her intervention likely prevented the affected student from sustaining more serious burns. According to Fire Captain Mike Rios, these actions may have prevented the student from sustaining more serious injuries.
ANALYSIS
Adoption of this proclamation spotlights the City Council’s recognition of Lizzy for her quick thinking and willingness to act when her classmate needed help. Lizzy demonstrated remarkable presence of mind and compassion in a crisis that could have resulted in greater harm.
Environmental Considerations
N/A
Commission Recommendation
N/A
Strategic Plan Integration
N/A
Alternatives
N/A
Coordination and Review
N/A
Budget/Cost Impact
N/A
ATTACHMENT
Proclamation
16 PROCLAMATION OF THE WEST SACRAMENTO CITY COUNCIL
RECOGNIZING ELIZABETH “LIZZY” SPINK
WHEREAS, during a science class laboratory on October 23, 2025, 8th-grade student Elizabeth “Lizzy” Spink, 14 years old, demonstrated real-time application of emergency response knowledge, including appropriate burn safety practices after a sudden fire incident involving another student; and
WHEREAS, when a classmate’s clothing and hair accidentally ignited during the science experiment, Lizzy remained calm and responded by running to the student, removing their burning jacket and headphones to reduce further risk of injury, and patting out the remaining flames on the student; and
WHEREAS, despite experiencing ongoing medical challenges of her own, Lizzy chose to stay at school for the remainder of the day; and
WHEREAS, the incident was later reviewed by West Sacramento Fire Captain Mike Rios, who noted that her response was quick, appropriate, and likely prevented more burns to the affected student; and
WHEREAS, Lizzy’s actions reflect extraordinary courage, presence of mind, and selfless concern for another student’s safety, placing the well-being of others above her own condition and comfort.
NOW, THEREFORE, BE IT PROCLAIMED by the City of West Sacramento City Council that we recognize the heroic effort of Elizabeth Spink, who stepped up to ensure the safety of another classmate, and are proud of her valor, courage, and leadership.
PROCLAIMED THIS 19TH day of August 2026.
ATTEST:
____________________________________
__
____________________________________
__
Martha Guerreo, Mayor Jennifer Cusmir, City Clerk
17 CITY COUNCIL AGENDA REPORT
MEETING DATE: August 19, 2026 ITEM # 4
SUBJECT:
CONSIDERATION OF RESOLUTION 26-77 DELEGATING AUTHORITY TO THE CITY
MANAGER TO UNDERTAKE CERTAIN ACTIONS TO COMMENCE AND COMPLETE
REAL PROPERTY TRANSACTIONS AND CONSIDERATION OF CONTRACT AMENDMENT NO.1 WITH WOOD RODGERS, INC. FOR THE NORTH 5TH STREET COMPLETE STREET PROJECT (CIP 16013)
INITIATED OR REQUESTED BY: REPORT COORDINATED OR PREPARED BY:
[ ] Council [X] Staff
[ ] Other
Christian Asuncion, Senior Engineer
Capital Projects Department
ATTACHMENT [X] Yes [ ] No [ ] Information [ ] Direction [X] Action
OBJECTIVE
The objective of this report is to obtain City Council adoption of Resolution 26-77, delegating authority to the City Manager to commence and complete real property transactions for the project, and approval of Contract Amendment No.1 to the professional services contract with Wood Rodgers, Inc. for the North 5th Street Complete Streets and Connectivity Project (“Project”) (CIP 16013).
RECOMMENDED ACTION
Staff respectfully recommends that the City Council:
1) Adopt Resolution 26-77, delegating authority to the City Manager to undertake certain actions to commence and complete all real property transactions for the Project (Attachment 1); 2) Approve and authorize the City Manager, or his designee, to execute Amendment No. 1 (Attachment 3) to the professional services contract with Wood Rodgers, Inc. in the amount of $203,601.74; 3) Authorize the City Manager, or his designee, to execute non-substantive changes or modifications, with approval from the City Attorney; and
4) Authorize the City Manager, or his designee, to execute amendments to further extend the term of the contract, if necessary.
BACKGROUND
Currently, 5th Street is a four-lane, divided arterial with Class II bike facilities between C Street and Fountain Drive/Watercolor Lane. There is on-street parking on 5th Street between A Street and C Street; however, this segment has a gap in bicycle infrastructure and unsignalized pedestrian crossings. Additionally, there are sidewalk gaps along 5th Street and C Street.
The North 5th Street Complete Streets and Connectivity Project includes a traffic analysis to review a proposed road diet and intersection safety improvements on 5th Street/Lighthouse Drive between C Street and Fountain Drive. The road diet would include enhanced Class II, parking-protected bike lanes and enhanced pedestrian crossings on 5th Street, between A Street and C Street, and on C Street, between 3rd Street and 6th Street.
Additionally, a proposed bicycle and pedestrian connection from A Street and 5th Street to the Riverwalk Trail will be analyzed.
The City recently completed the North Riverwalk Trail Extension, which extended the Riverwalk Trail from E Street and 2nd Street to the Broderick Boat Ramp at 4th Street. The connection at 5th Street and A Street to 4th Street and Broderick Boat Ramp will provide an ADA-accessible connection to the Riverwalk Trail. These regionally important projects enhance recreation opportunities, and it is important to develop a safe network to reach these destinations.
On June 28, 2023, the City was awarded a State Active Transportation Program (ATP) grant under Cycle 6 in the amount of $638,000 for the Project Approval & Environmental Document (PA&ED), Plans, Specifications, and Estimate (PS&E), and Right-of-Way (ROW) phases. On March 14, 2024, the City requested a fund allocation for the PA&ED phase in the amount of $89,000. The California Transportation Commission (CTC) allocated these funds at their May 17, 2024, meeting.
On November 5, 2024, the City released a formal solicitation for professional services for the North 5th Street Complete Streets and Connectivity Project (24-064-RFP). On January 15, 2025, City Council awarded a professional services contract for design to Wood Rodgers, Inc., to begin the design phase. On April 13, 2026, 18 North 5th Street Complete Streets and Connectivity (CIP 16013) August 19, 2026
the City requested a fund allocation for the ROW and PS&E phases in the amount of $239,000 and $310,000, respectively. The CTC allocated these funds at their March 20, 2026 meeting.
When constructed, the North 5th Street Complete Streets and Connectivity Project will improve safety, close gaps in the active transportation network, and provide people of all abilities with safe, accessible connections to walk or roll to their destinations. The project is located entirely within an SB 535–designated disadvantaged community and is adjacent to several senior and low-income housing developments. It will create a safe, lowstress active transportation network for the surrounding community, students, and visitors of all ages and abilities.
ANALYSIS
Resolution 26-77
On March 20, 2026, the CTC issued authorization to the City to proceed with the right-of-way phase for the Project. This authorization was required before ATP grant funds could be used for this phase of the Project. Now that this authorization has been received, Wood Rodgers, the lead consultant, and Monument ROW, the subconsultant for right-of-way services, will work closely with City staff to commence and complete the right-ofway acquisition process. The right-of-way effort will include real property acquisition discussions with the property owners of Assessor Parcel Numbers 010-523-012-000, 010-523-008-000, and 010-523-030-000.
Wood Rodgers Contract Amendment No. 1
The design phase for the Project is currently ongoing, with an anticipated completion date of August 2027. In order to complete the design phase, an additional amount of $203,601.74 is requested. This work will include completing the plans, specifications, and estimate to 100%, preparing a pavement analysis, preparing a Supplemental Mitigated Negative Declaration, and additional topographic survey.
Table 1. Wood Rodgers Contract
Amount
Original Contract (1/15/2025) $614,814.72
Amendment No. 1 (requested) $203,601.74
Total $818,416.46
Environmental Considerations
On January 21, 2026, the City Council adopted the Final Initial Study/Mitigated Negative Declaration for the Project with Resolution 26-8. As the project has not been modified since that time, no new environmental analysis is required, consistent with State CEQA Guidelines Section 15162 and 15168(c)(2).
Commission Recommendation
Not Applicable.
Strategic Plan Integration
Not Applicable.
Alternatives
The City Council may choose among the following alternatives:
1) Approve the recommended actions as stated above.
2) Amend the recommended actions.
3) Decline to approve the recommended actions or cancel the project.
Staff recommend Alternative 1 in order to keep the project on schedule. Alternatives 2 and 3 are not recommended because they would delay the project.
Coordination and Review
This report was prepared by the Capital Projects Department. 19 North 5th Street Complete Streets and Connectivity (CIP 16013) August 19, 2026
Budget/Cost Impact
This project is included in the City’s current Capital Improvement Program (CIP) as CIP 16013: North 5th Street Complete Streets and Connectivity Project and is fully funded. For the recommended action, there is sufficient funding available in the project budget and no additional funds are required.
Table 2. Funding and Sources
Funding Totals
Cycle 6 State ATP Grant $638,000
Grant Funds $638,000
Measure G $155,000
Measure V $1,122,000
EIFD Construction Bonds $1,277,000
City Funds $2,554,000
Total Appropriated Funds $3,192,000
ATTACHMENTS
1) Resolution 26-77
2) Vicinity Map
3) CPE24-354 Wood Rodgers Amendment No. 1
20 Attachment 1
RESOLUTION 26-77
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF WEST SACRAMENTO
DELEGATING AUTHORITY TO THE CITY MANAGER TO UNDERTAKE CERTAIN ACTIONS
TO COMMENCE AND COMPLETE REAL PROPERTY TRANSACTIONS FOR THE CONSTRUCTION OF THE NORTH 5TH STREET COMPLETE STREETS AND CONNECTIVITY PROJECT (CIP 16013)
WHEREAS, the City of West Sacramento (City) initiated the North 5th Street Complete Streets and Connectivity Project (“Project”) to increase safety, close gaps in the active transportation system, and provide people of all abilities with safe connections to walk or roll to their destinations; and
WHEREAS, on June 28, 2023, the City was awarded a State Active Transportation Program (ATP) grant under Cycle 6 in the amount of $638,000, for the Project Approval & Environmental Document (PA&ED), Plans, Specifications, and Estimate (PS&E), and Right-ofWay (ROW) phases; and WHEREAS, on May 17, 2024, the California Transportation Commission (CTC) allocated funds from the State ATP Grant in the amount of $89,000 for the PA&ED phase; and WHEREAS, on November 5, 2024, City staff issued a Request for Proposals for the North 5th Street Complete Streets and Connectivity Project (24-064-RFP) to obtain proposals from engineering firms to conduct surveying, engineering reports preparation, environmental analysis and permitting, public outreach, utility coordination, right-of-way activities, PS&E, and design and support services during construction; and
WHEREAS, on January 15, 2025, the City Council awarded a Professional Services Contract to Wood Rodgers, Inc., for engineering services and its subconsultant, Monument ROW to commence and complete acquisition of the real property interests required for construction of the Project; and
WHEREAS, on March 20, 2026, the California Transportation Commission allocated funds from the State ATP Grant in the amount of $239,000 for the ROW Phase and $310,000 for the PS&E phase; and
WHEREAS, real property fee title offers, permanent easements, temporary construction easements, part take acquisitions, licenses and permits are necessary for construction of the Project.
NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of West Sacramento hereby delegates authority to the City Manager to act on the City’s behalf to commence discussions and make fee offers, permanent easement offers, temporary construction easement offers, permits, and licenses, and all other real property acquisitions required to complete construction of the Project.
BE IT FURTHER RESOLVED that the City Council of the City of West Sacramento authorizes the City Manager to accept offers and counter offers, authorize settlements, execute purchase and sale agreements, execute escrows, and to take any and all actions that may be necessary or advisable to complete the real property transactions required for the construction of the North 5th Street Complete Streets and Connectivity Project. 21 Resolution 26-77
PASSED AND ADOPTED, by the City Council of the City of West Sacramento on this 19th day of August 2026, by the following vote:
AYES:
NOES:
ABSENT:
Martha Guerrero, Mayor
ATTEST:
Jennifer Cusmir, City Clerk
22 Attachment 2
23 Attachment 3
Wood Rodgers, Inc.
CPE24-354 North 5th St Complete Streets and Connectivity Expires 6/30/2027
AMENDMENT NO. 1
to the
CONTRACT FOR SERVICES
between the
CITY OF WEST SACRAMENTO
And
Wood Rodgers, Inc.
Dated January 15, 2025
This Amendment No. 1 to the Contract for Services between the City of West Sacramento (City) and Wood Rodgers, Inc. (Consultant) dated January 15, 2025 for the North 5th Street Complete Streets and Connectivity Project, is made and entered into this 19th day of August 2026. Except as expressly amended herein, the January 15, 2025 Contract for Services is in full force and effect.
RECITALS
WHEREAS, in January 15, 2025, the City awarded a professional services contract to Wood Rodgers, Inc. to prepare environmental documentation, engineering plans, specifications, estimates and provide right-of-way services for the North 5th Street Complete Streets and Connectivity Project in the amount of $614,814.72; and
WHEREAS, on May 17, 2024, the California Transportation Commission allocated funds from the State ATP Grant in the amount of $89,000 for the PA&ED phase; and WHEREAS, on March 20, 2026, the California Transportation Commission allocated funds from the State ATP Grant in the amount of $239,000 for the ROW Phase and $310,000 for the PS&E phase; and
WHEREAS, the City and Consultant desire to amend said contract; NOW, THEREFORE, IT IS MUTUALLY AGREED by parties hereto to amend said agreement as follows:
I. SCOPE OF SERVICES:
The scope of services as set forth in the Contract for Services dated January 15, 2025, shall be revised to include modified and additional services identified in the proposal dated June 29, 2026, attached hereto as Exhibit A.
II. COMPENSATION:
The compensation as set forth in the Contract for Services dated January 15, 2025, shall be increased by $203,601.74 to include the modified and additional services identified in the proposal dated June 29, 2026, attached hereto as Exhibit A and total compensation shall not exceed $818,416.46 without the City’s prior written approval.
III. REMAINING TERMS AFFECTED:
Except as expressly set forth herein, all terms and conditions of the Contract remain in full force and effect. In the event of a conflict between the Amendment No. 1 and the Contract, the terms of Amendment No. 1 shall control.
IN WITNESS WHEREOF the parties hereto have executed this Amendment No. 1 as the date herein set forth.
CITY OF WEST SACRAMENTO
By:
Amanda Berlin, Assistant City Manager
24 Wood Rodgers, Inc.
CPE24-354 North 5th St Complete Streets and Connectivity Expires 6/30/2027
WOOD RODGERS, INC.
By: Mark Rayback, President
APPROVED AS TO FORM
By:
Jeffrey Mitchell, City Attorney
ATTEST:
By: ________________________________________________________ Jennifer Cusmir, City Clerk
25 Corporate Office: 3301 C Street, Bldg. 100-B • Sacramento, CA 95816 • 916.341.7760 • Fax 916.341.7767 Offices located in California and Nevada
www.woodrodgers.com
June 29, 2026
Christian Asuncion
Capital Projects Department
1110 West Capitol Avenue
West Sacramento, California 95691
RE: North 5th Streets Complete Streets and Connectivity Project (CPE24-354, WR#8621017)
Amendment #1
In response to your request, Wood Rodgers, Inc. (Wood Rodgers) is pleased to present the City of West Sacramento (City) with this proposal to provide additional design services during the 60% PS&E phase necessitated by the proposed pavement rehabilitation. This proposal includes tasks to advance the project through the 90% and final PS&E phases.
Wood Rodgers estimates a Time-and-Materials (T/M) budget increase of $203,601.74 for completion of the following scope of services. The additional items in this request are summarized in the following Scope of Services:
TASK 1.1 | Meetings and Consultation
• Wood Rodgers will attend up to twenty (20) additional meetings during the 90% and final PS&E phase.
• Wood Rodgers will facilitate 1 PDT meeting each month during the 90% and final PS&E phase.
TASK 1.2 | Reporting and Invoicing
Wood Rodgers will continue responsibilities previously described in the contract through the 90% and final PS&E phase.
TASK 1.3 | Quality control
Wood Rodgers will continue responsibilities previously described in the contract through the 90% and final PS&E phase.
Deliverables Task 1:
• Meeting agendas, minutes, action items
• Monthly Progress Reports
• Project Schedule
26 City of West Sacramento
June 29, 2026
TASK 2.4.6 | Pavement Analysis and Memo
Blackburn Consulting will evaluate existing pavement along 5th Street and provide overlay or replacement recommendations. Additional scope of work includes:
• Perform pavement deflection testing at intervals of approximately 100-feet for each travel lane. • Core through existing HMA pavement, measuring section thickness and collecting subgrade samples for laboratory testing at intervals of approximately 500-feet. • Backfill the cores with sand or pea gravel and patch the surface. The scope does not include sawcutting to enlarge the patch area or patching with HMA. • Perform up to three R-value tests on representative subgrade samples. • Analyze the mapped pavement condition, deflection testing results to evaluate pavement overlay design and evaluate any required full depth reconstruction requirements. • Prepare a Pavement Design Memo showing existing pavement conditions, coring locations, approximate pavement base failure areas and pavement rehabilitation recommendations (i.e., HMA overlay, full depth reconstruction)
Deliverables Task 2.4:
• Pavement coring, sampling, deflection testing and R-value tests • Pavement Design Memo
TASK 3.4 | CEQA Initial Study/Mitigate Negative Declaration Wood Rodgers will prepare a Supplemental Mitigated Negative Declaration to account for a new impact and mitigation associated with the necessary removal of mature trees along the Sacramento River West Levee. These trees were originally anticipated to be removed by Army Corps but delays in their project may require that they be removed as part of the trail access point construction. The Supplemental MND will be prepared for City approval. Wood Rodgers will facilitate an additional round of public review including mailing public notices, submittal to the State Clearinghouse, and responding to public comments if any are received. The document will also identify appropriate mitigation options for the City to obtain prior to construction. After public review, Wood Rodgers will prepare a Final Supplemental MND for City approval and will prepare a Notice of Determination to complete the CEQA update process. Deliverables Task 3.4:
• Draft Supplemental Mitigated Negative Declaration
• Public Notices, State Clearinghouse Forms, and Direct Mailers • Final Supplemental Mitigated Negative Declaration
• Notice of Determination
27 City of West Sacramento
June 29, 2026
TASK 5.1 | Topographic Surveying
Wood Rodgers will supplement the aerial survey collected on February 18th, 2025, with a ground survey to provide greater detail of the curb returns in the following intersections:
• Lighthouse Drive and Fountain Drive/Watercolor Lane
• Lighthouse Drive and Marina Way
• 5th Street and B Street
Supplemental surveys will provide design level topo on hardscape, such as sidewalks, curbs, ramps, roads, etc. Along with surface utilities in the indicated areas. Deliverables Task 5.1:
• Supplemental topographic survey
TASK 7.2 | 60% Design and Plans, Specifications and Estimate Wood Rodgers will include the following additional items to the scope of work:
• Design up to nine (9) additional ADA accessible curb ramps within the project limits. • Design one (1) ADA accessible passageway at Lighthouse Drive and Fountain Drive/Watercolor Lane
• Draft up to five (5) additional detail sheets.
• Incorporate additional construction items into the master estimate and technical specifications. • Additional QA/QC level of effort to review additional curb ramps. Deliverables Task 7.2:
• Additional construction detail sheets and specifications TASK 7.3 | 90% Design and Plans, Specifications and Estimate The City will review the 60% submittal documents and provide Wood Rodgers with a compiled set of comments. Wood Rodgers will meet with the City staff to discuss the comments and resolutions. Wood Rodgers will proceed to address all comments and provide a written response to comments in a tabulated format prior to proceeding to the next stage of the PS&E development.
Wood Rodgers will prepare a 90% submittal package consisting of plans, specifications, construction cost estimate, and bid schedule. The PS&E will include all information relevant to bidding and construction and include information gathered from all previous tasks.
Deliverables Task 7.3:
• Submit one (1) set of City’s review comments and tabulated responses. 28 City of West Sacramento
June 29, 2026
• Facilitate one (1) virtual review meeting with the City staff. • Prepare and submit 95% plans, specifications and estimate (pdf) TASK 7.4 | Final Design and Plans, Specifications and Estimate The City will review the 90% submittal documents and provide Wood Rodgers with a compiled set of comments. Wood Rodgers will meet with the City staff to discuss the comments and resolutions. Wood Rodgers will proceed to address all comments and provide a written response to comments in a tabulated format. Wood Rodgers will prepare a final submittal package consisting of plans, specifications, and a bid schedule.
Deliverables Task 7.4:
• Submit one (1) set of City’s review comments and tabulated responses. • Facilitate one (1) virtual review meeting with the City staff. • Prepare and submit final plans, specifications and bid schedule (pdf) • Submit all digital files (AutoCAD Civil3D 2024, MS Excel & Word) Wood Rodgers anticipates a Time and Materials, Not-to-Exceed without Authorization, budget increase for the completion of additional scope of work under Amendment #1:
Scope Amendment #1 Total Budget $203,601.74
Current Project Budget (NTE) $614,814.72
New Total Budget with Amendment #1 $818,416.46
If this proposal is acceptable to the City, please return a signed copy of this proposal and a Notice to Proceed at your earliest convenience. This proposal is valid for thirty (30) days.
Thank you for the opportunity to continue our support of the City on this interesting project.
Sincerely, In Agreement with the Above Terms:
___________ ___________________
David Melis, PE Signature
Principal Engineer Name:
Wood Rodgers, Inc. Title:
______________ ________________
Date
Enclosures
29 Staffing Worksheet
PROJECT: North 5th Complete Streets and Connectivity DATE 6/22/2026LOCATION: City of West Sacramento PRIME SUB 1 Principal
Engineer I
Senior
Engineer I
Project
Engineer I Planner II Engineer II Engineer I Project Surveyor II Surveyor II Survey Crew Employee Name D. Melis T. Chamberlain K. Alexandrova TBD TBD TBD TBD TBD TBD Billing Rate $ 365.81 $ 246.53 $ 162.09 $ 148.86 $ 172.02 $ 135.63 $ 191.87 $ 158.79 $ 200.09 TASK 1PROJECT MANAGEMENT & COORDINATION 44080 0 0 0 0 0 0124 2 $ 9,063.04 $ 29,063.04 - $ $ - $ - $ - $ 29,063.04
1.1 Meetings and Consultation 20 20 40 $ 10,558.04 $ - $ 10,558.04 $ - $ - $ - $ 10,558.04
1.2 Reporting and Invoicing 16 16 $ 5,852.95 $ - $ 5,852.95 $ - $ - $ - $ 5,852.95
1.3 Quality Control 8 60 68 $ 12,652.05 $ - $ 12,652.05 $ - $ - $ - $ 12,652.05 TASK 2DATA COLLECTION 0 0 0 0 0 0 0 0 00 - $ -$ $ 13,059.31 - $ $ 26,054.50 $ 39,113.81 $ 39,113.81
2.4.6 Pavement Analysis and Memo 0- $ $ - $ 13,059.31 - $ $ 26,054.50 $ 39,113.81 $ 39,113.81 TASK 3ENVIRONMENTAL DOCUMENTATION 024080 0 0 0 0 0104 1 $ 7,825.54 $ 17,825.54 - $ $ - $ - $ - $ 17,825.54
3.4 CEQA Initial Study / Mitigated Negative Declaration 24 80 104 $ 17,825.54 $ - $ 17,825.54 $ - $ - $ - $ 17,825.54 TASK 5 SURVEYING 0 0 0 0 0 0 219 16 37 6 $ ,602.05 $ - $ 6,602.05 $ - $ - $ - $ 6,602.05
5.1 Topographic Surveying 2 19 16 37 $ 6,602.05 $ - $ 6,602.05 $ - $ - $ - $ 6,602.05 TASK 7 PLANS, SPECIFICATIONS & ESTIMATES 0 0 234 0 204 280 0 0 0 718 110,997.29 $ -$ 110,997.29 $ $ - $ - $ - $ 110,997.29
7.2 60% Design Plans, Specifications and Estimates 72 34 80 186 $ 28,369.58 $ - $ 28,369.58 $ - $ - $ - $ 28,369.58
7.3 90% Design Plans, Specifications and Estimates 112 100 140 352 $ 54,344.15 $ - $ 54,344.15 $ - $ - $ - $ 54,344.15
7.4 Final Design Plans, Specifications and Estimates 50 70 60 180 $ 28,283.57 $ - $ 28,283.57 $ - $ - $ - $ 28,283.57 44 24 314 80 204 280 2 19 16 983 164,487.93 $ -$ 164,487.93 $ $ 13,059.31 $ 26,054.50 $ 39,113.81 $ 16,095.60 $ 5,916.67 $ 50,897.20 $ 11,908.87 $ 35,091.47 $ 37,976.06 $ 383.73 $ 3,016.92 $ 3,201.39 TOTAL ESTIMATED COST: 203,601.74 $
Blackburn Consulting TOTAL
TOTAL HOURS
SUBTOTAL COST
TASK HOURS
TASK LABOR
OTHER DIRECT COSTS
Wood Rodgers TOTAL
TOTAL
TOTAL AMOUNT
LABOR
OTHER DIRECT COSTS
Wood Rodgers Blackburn Consulting
TOTAL AMOUNT
30 Consultant Wood Rodgers, Inc.
Project No. Contract No. Date 6/22/2026
Project Name
DIRECT LABOR
Hours Actual Hourly Rate Total
Principal Engineer I 44 $113.90 $ 5,011.60
Senior Engineer I 24 $76.76 $ 1,842.24
Project Engineer I 314 $50.47 $ 15,847.58
Principal Engineer II 0 $154.50 $ -
Principal Engineer I 0 $113.90 $ -
Senior Engineer II 0 $96.56 $ -
Senior Engineer I 0 $85.82 $ -
Project Engineer II 0 $73.24 $ -
Project Engineer I 0 $64.12 $ -
Engineer II 204 $53.56 $ 10,926.24
Engineer I 280 $42.23 $ 11,824.40
Designer 0 $40.17 $ -
Sr. CAD Tech / Graphics Designer II 0 $50.47 $ -
Senior Surveyor II 0 $89.14 $ -
Senior Surveyor I 0 $62.64 $ -
Project Surveyor II 2 $59.74 $ 119.48
Project Surveyor I 0 $59.69 $ -
Surveyor II 19 $49.44 $ 939.36
Surveyor I 0 $44.55 $ -
Survey Crew 16 $62.30 $ 996.80
Principal GIS I 0 $91.61 $ -
Senior GIS II 0 $85.67 $ -
Senior GIS I 0 $74.68 $ -
Project GIS II 0 $66.95 $ -
Project GIS I 0 $55.11 $ -
Principal Planner I 0 $106.47 $ -
Senior Planner II 0 $82.95 $ -
Senior Planner I 0 $73.04 $ -
Project Planner II 0 $60.66 $ -
Project Planner I 0 $64.38 $ -
Planner II 80 $46.35 $ 3,708.00
Planner I 0 $39.66 $ -
Senior Geologist II 0 $81.71 $ -
Senior Geologist I 0 $68.59 $ -
Project Geologist II 0 $63.14 $ -
Project Geologist I 0 $58.71 $ -
Principal Landscape Architect I 0 $91.61 $ -
Senior Landscape Architect I 0 $61.90 $ -
Project Landscape Architect I 0 $52.79 $ -
Project Coordinator 0 $44.29 $ -
983
LABOR COSTS
a) Subtotal Direct Labor Costs $ 51,215.70
b) Anticipated Salary Increases (see page 2 for calculation) $0.00 c) TOTAL DIRECT LABOR COSTS [(a) + (b)] $ 51,215.70
INDIRECT COSTS
d) Fringe Benefits Rate: 59.21%) Total Fringe Benefits [(c) x (d)] $ 30,324.82 f) Overhead Rate: 132.76% g) Overhead [(c) x (f)] $ 67,993.96 h) General & Administrative Rate: 0.00% i) Gen & Admin [(c) x (h)] $ - 191.97%
j) TOTAL INDIRECT COSTS [(e) + (g) + (i)] $ 98,318.78
FIXED FEE k) TOTAL FIXED FEE [(c) + (j)] x fixed fee 10% ] $ 14,953.45 l) CONSULTANT'S OTHER DIRECT COSTS (ODC) - ITEMIZE
Quantity Unit Unit Cost Total
$ -
$ -
$ -
$ -
$ -
m) SUBCONSULTANT'S COSTS (Add additional pages if necessary) Subconsultant 1: $ 39,113.81
Subconsultant 2: $ -
m) TOTAL SUBCONSULTANT'S COSTS $ 39,113.81
n) TOTAL OTHER DIRECT COSTS INCLUDING SUBCONSULTANTS [(l) + (m)] $ 39,113.81 TOTAL COST [(c) + (j) + (k) + (n)] $ 203,601.74
TBD
TBD
TBD
TBD
TBD
TBD
TBD
TBD
TBD
TBD
TBD
TBD
COST-PLUS-FIXED FEE OR LUMP SUM OR FIRM FIXED PRICE CONTRACTS COST PROPOSAL 1
Note: Mark-ups are Not Allowed
TBD
Classification/Title Name
City of West Sacramento - North 5th Street Complete Streets and Connectivity Katie Alexandrova
Tim Chamberlain
David Melis
TBD
TBD
TBD
TBD
TBD
TBD
Blackburn Consulting
Combined ICR %:
Description of Item
TBD
TBD
TBD
TBD
TBD
TBD
TBD
TBD
TBD
TBD
TBD
TBD
TBD
TBD
TBD
TBD
TBD
TBD
Prime Consultant Subconsultant 2nd Tier Subconsultant
31 COST PROPOSAL 1
1. Calculate Average Hourly Rate for 1st Year of the Contract (Direct labor subtotal divided by total hours) Avg Hourly 5 Year Contract
Rate Duration
$51,215.70 = 32.33
2. Calculate hourly rate for all years (Increase the Average Hourly Rate for a year by proposed escalation %) Avg Hourly Rate
Year 1 $32.33 + = $33.95 Year 2 Avg Hourly Rate
Year 2 $33.95 + = $35.65 Year 3 Avg Hourly Rate
Year 3 $35.65 + = $37.43 Year 4 Avg Hourly Rate
Year 4 $37.43 + = $39.30 Year 5 Avg Hourly Rate
3. Calculate estimated hours per year (Multiply estimate % each year by total hours) Total Hours
per Year
Year 1 100% * = 1584.00 Est Hours Year 1
Year 2 0% * = 0.00 Est Hours Year 2
Year 3 0% * = 0.00 Est Hours Year 3
Year 4 0% * = 0.00 Est Hours Year 4
Year 5 0% * = 0.00 Est Hours Year 5
Total 100% = 1584.00
Year 1 $32.33 *= $51,215.70 Est Hours Year 1
Year 2 $33.95 *= $0.00 Est Hours Year 2
Year 3 $35.65 *= $0.00 Est Hours Year 3
Year 4 $37.43 *= $0.00 Est Hours Year 4
Year 5 $39.30 *= $0.00 Est Hours Year 5
Total Direct Labor Cost with Escalation = $51,215.70
Direct Labor Subtotal before Escalation = $51,215.70
Estimated Total of Direct Labor Salary Increase = $0.00 (Transfers to Page 1) NOTES:
1. This is not the only way to estimate salary increases. Other methods will be accepted if they clearly indicate the % increase, the # of years of the contract, and a breakdown of the labor to be performed each year.
2. An estimation that is based on direct labor multiplied by salary increase % multiplied by the # of years is not acceptable. (i.e. $250,000 x 2% x 5 years = $25,000 is not an acceptable methodology)
3. This assumes that one year will be worked at the rate on the cost proposal before salary increases are granted.
4. Calculations for anticipated salary escalation must be provided.
Direct Labor Subtotal Total Hours
Total
per Cost Proposal per Cost Proposal
0 0
Avg Hourly Rate Estimated hours
per Cost Proposal
1584
1584
0 1584
0 Year 1 Avg Hourly Rate
CALCULATIONS FOR ANTICIPATED SALARY INCREASE
1584
5.0%
5.0%
5.0%
5.0%
1584
Proposed Escalation
(calculated above)
Cost per Year
4. Calculate Total Costs including Escalation (Multiply Average Hourly Rate by the number Estimated % Total Hours
Completed Each Year
(calculated above)
1584
1584
32 COST PROPOSAL 1
1. Generally Accepted Accounting Principles (GAAP)
2. Terms and conditions of the contract
3. Title 23 United States Code Section 112 - Letting of Contracts
4. 48 Code of Federal Regulations Part 31 - Contract Cost Principles and Procedures
5. 23 Code of Federal Regulations Part 172 - Procurement, Management, and Administration of Engineering and Design Related
6. 48 Code of Federal Regulations Part 9904 - Cost Accounting Standards Board (when applicable) Prime Consultant or Subconsultant Certifying:
Name: Title *:
Signature : Date of Certification: 6/22/2026
Email: Phone Number:
Address:
List services the consultant is providing under the proposed contract:
ENGINEERING SERVICES
CERTIFICATION OF DIRECT COSTS
All costs must be applied consistently and fairly to all contracts. All documentation of compliance must be retained in the project files and be in compliance with applicable federal and state requirements. Costs that are noncompliant with the federal and state requirements are not eligible for reimbursement.
Local governments are responsible for applying only cognizant agency approved or Caltrans accepted In direct Cost Rate(s).
*An individual executive or financial officer of the consultant’s or subconsultant’s organization at a level no lower than a Vice President or a Chief Financial Officer, or equivalent, who has authority to represent the financial information utilized to establish the cost proposal for the contract.
I, the undersigned, certify to the best of my knowledge and belief that all direct costs identified on the cost proposal(s) in this contract are actual, reasonable, allowable, and allocable to the contract in accordance with the contract terms and the following requirements:
Wood Rodgers, Inc., 3301 C Street, Bldg 100-B, Sacramento, CA 95816 [email protected] (916) 633-1982
David Melis Principal
33 Cost Proposal 1
Fee Itemization for Geotechnical Report Cost Plus Fixed Fee or Lump Sum Prime Consultant Subconsultant 2nd Tier Subconsultant
Consultant: Blackburn Consulting
Project No. Contract No. Date 6/12/2026
Range Hours Actual Hourly
Rate Total Bill Rate
$97 - $125 $ 119.26 $ - $ 507.17
$97 - $125 5 $ 113.81 $ 569.05 $ 483.99
$55 - $85 $ 72.23 $ - $ 307.17
$55 - $85 $ 71.76 $ - $ 305.17
$55 - $85 17 $ 57.31 $ 974.27 $ 243.72
$55 - $85 $ 62.89 $ - $ 267.45
$50 - $75 $ 58.53 $ - $ 248.90
$50 - $75 $ 71.40 $ - $ 303.64
$50 - $75 $ 61.30 $ - $ 260.68
$50 - $65 $ 50.96 $ - $ 216.71
$30 - $49 $ 31.62 $ - $ 134.47
$30 - $49 $ 33.00 $ - $ 140.34
$30 - $49 18 $ 32.85 $ 591.30 $ 139.70
$30 - $49 18 $ 31.62 $ 569.16 $ 134.47
$60 - $92 $ 79.84 $ - $ 339.53
$45 - $73.5 $ 47.50 $ - $ 202.00
$20 - $45 7 $ 41.12 $ 287.84 $ 174.87
$20 - $45 $ 21.42 $ - $ 91.09
$20 - $35 2 $ 25.23 $ 50.46 $ 107.29
$20 - $35 1 $ 28.82 $ 28.82 $ 122.56
LABOR COSTS 68
$ 3,070.90
$ -
c) TOTAL DIRECT LABOR COSTS [(a) + (b)] $ 3,070.90
INDIRECT COSTS
) e) Total Fringe Benefits [(c) x (d)] $ -
286.60% ) g) Overhead [(c) x (f)] $ 8,801.20
) i) Gen & Admin [(c) x (h)] $ -
j) TOTAL INDIRECT COSTS [(e) + (g) + (i)] $ 8,801.20
FIXED FEE k) TOTAL FIXED FEE [(c) + (j)] x fixed fee: 10% $ 1,187.21 l) CONSULTANT'S OTHER DIRECT COSTS (ODC) - ITEMIZE (Add additional pages if necessary) Quantity Unit Unit Cost Total
20 mile @ IRS rate $ 14.50
1 lump $ 26,040.00 $ 26,040.00
$ - $ -
l) TOTAL OTHER DIRECT COSTS $ 26,054.50
m) SUBCONSULTANTS' COSTS (Add additional pages if necessary) m) TOTAL SUBCONSULTANTS' COSTS $ -
n) TOTAL OTHER DIRECT COSTS INCLUDING SUBCONSULTANTS [(l) + (m)] $ 26,054.50 TOTAL COST [(c) + (j) + (k) + (n)] $ 39,113.81
NOTES:
1. 2.
3. Note: Mark-ups are Not Allowed
RFP 24-064-RFP
DIRECT LABOR
Classification/Title Name
Sr. Project Manager David Morrell
Sr. Project Manager Robert Pickard
Sr. Project Manager (Environmental) Laura Long
Sr. Principal Robert Lokteff
Principal Haze Rodgers
Sr. Project Manager Ken Johnson
Sr. Engineer Luke Morrell
Project Engineer Joshua Budean
Project Engineer Dennis Magana
Project Manager Robert Sandquist
Project Manager Daniel Contreras
Project Manager (Environmental) Miljan Draganic
Project Engineer - OT To be determined
Drafter Ryan Hiett
Assistant Natalie Mutto
Project Engineer Alex Garcia
Project Engineer Liza Romanyuk
PW Tester/Inspector Grp 3 To be determined
Administrative To be determined
a) Subtotal Direct Labor Costs
b) Anticipated Salary Increases (see page 2 for calculation) Pavement Deflection Testing
d) Fringe Benefits (Rate:
f) Overhead & G&A (Rate:
h) General & Admin (Rate:
Description of Item
Mileage
Subconsultant 1:
Subconsultant 2:
Subconsultant 3:
Subconsultant 4:
Key personnel must be marked with an asterisk (*) and employees that are subject to prevailing wage requirements must be marked with two asterisks (**). All costs must comply with the Federal cost principles. Subconsultants will provide their own cost proposals.
The cost proposal format shall not be amended. Indirect cost rates shall be updated on an annual basis in accordance with the consultant's annual accounting period and established by a cognizant agency or accepted by Caltrans.
Anticipated salary increases calculation (page 2) must accompany.
Drafter Luke Dixon
34 Consultant
Project No. Contract No. Date 6/12/2026
1. Calculate Average Hourly Rate for 1st year of the contract (Direct Labor Subtotal divided by total hours) Avg Hourly 5 Year Contract
Rate Duration
$ 3,070.90 = $ 45.16 Year 1 Avg Hourly Rate
Avg Hourly Rate
Year 1 $ 45.16 + = $ 46.97 Year 2 Avg Hourly Rate
Year 2 $ 46.97 + = $ 48.85 Year 3 Avg Hourly Rate
Year 3 $ 48.85 + = $ 50.80 Year 4 Avg Hourly Rate
Year 4 $ 50.80 + = $ 52.83 Year 5 Avg Hourly Rate
Total Hours
per Year
Year 1 100.00% * = 68.0 Estimated Hours Year 1
Year 2 0.00% * = 0.0 Estimated Hours Year 2
Year 3 0.00% * = 0.0 Estimated Hours Year 3
Year 4 0.00% * = 0.0 Estimated Hours Year 4
Year 5 0.00% * = 0.0 Estimated Hours Year 5
Total 100% = 68.0
Year 1 $ 45.16 * = $ 3,070.90 Estimated Hours Year 1
Year 2 $ 46.97 * = $ - Estimated Hours Year 2
Year 3 $ 48.85 * = $ - Estimated Hours Year 3
Year 4 $ 50.80 * = $ - Estimated Hours Year 4
Year 5 $ 52.83 * = $ - Estimated Hours Year 5
= $ 3,070.90
= $ 3,070.90
= $ - Transfer to Page 1
NOTES:
1. 2.
3. 4.
Direct Labor Subtotal Total Hours
per Cost Proposal per Cost Proposal
68 CALCULATIONS FOR ANTICIPATED SALARY INCREASES
Blackburn Consulting
RFP 24-064-RFP 0
4%
4%
3. Calculate estimated hours per year (Multiply estimate % each year by total hours) Estimated % Total Hours
2. Calculate hourly rate for all years (Increase the Average Hourly Rate for a year by proposed escalation %) Proposed Escalation
4%
4%
Estimated hours Cost per Year (calculated above) (calculated above) Completed Each Year per Cost Proposal
68.0 68.0
68.0 68.0
Direct Labor Subtotal before Escalation
Estimated total of Direct Labor Salary Increase
This is not the only way to estimate salary increases. Other methods will be accepted if they clearly indicate the % increase, the # of years of the contract, and a breakdown of the labor to be performed each year.
An estimation that is based on direct labor multiplied by salary increase % multiplied by the # of years is not acceptable. (i.e. $250,000 x 2% x 5 yrs = $25,000 is not an acceptable methodology).
This assumes that one year will be worked at the rate on the cost proposal before salary increases are granted.
Calculations for anticipated salary escalation must be provided. 68 0
0 0
0 Total Direct Labor Cost with Escalation
68.0 Total
4. Calculate Total Costs including Escalation (Multiply Average Hourly Rate by the number of hours) Avg Hourly Rate
35 I, the undersigned, certify to the best of my knowledge and belief that all direct costs identified on the cost proposal(s) in this contract are actual, reasonable, allowable, and allocable to the contract in accordance with the contract terms and the following requirements:
1. Generally Accepted Accounting Principles (GAAP)
2. Terms and conditions of the contract
3. Title 23 United States Code Section 112 - Letting of Contracts
4. 48 Code of Federal Regulations Part 31 - Contract Cost Principles and Proceedures
5. 23 Code of Federal Regulations Part 172 - Procurement, Management and Administration of Engineering and Design Related Service
6. 48 Code of Federal Regulations Part 9904 - Cost Accounting Standards Board (when applicable) All costs must be applied consistently and fairly to all contracts. All documentation of compliance must be retained in the project files and be in compliance with applicable federal and state requirements. Costs that are noncompliant with the federal and state requirements are not eligible for reimbursement. Local governments are responsible for applying only cognizant agency or Caltrans accepted Indirect Cost Rate(s).
Name: Wendy Supinger Title *: Principal
Signature: Date of Certification: 6/12/2026
Email: [email protected] Phone number: 530-887-1494 Address: Blackburn Consulting, 11521 Blocker Dr., Ste. 110, Auburn, CA 95603 List services the consultant is providing under the proposed contract:
Certification of Direct Costs:
Prime Consultant or Subconsultant Certifying:
* An individual executive or financial officer of the consultant's or subconsultant's organization at a level no lower than a Vice President or a Chief Financial Officer, or equivalent, who has authority to represent the financial information utilized to establish the cost proposal for the contract.
Providing Geotechnical Services for the City of West Sacramento North 5th Street Complete Streets and Connectivity Project. RFP: 24-064-RFP 36 CITY COUNCIL AGENDA REPORT
MEETING DATE: August 19, 2026 ITEM # 5
SUBJECT:
CONSIDERATION OF APPROVAL OF A PROFESSIONAL SERVICES CONTRACT WITH
SCHAAF & WHEELER FOR PROFESSIONAL ENGINEERING SERVICES FOR THE BRYTE SEWER PUMP STATION REHABILITATION PROJECT (CIP 33031) INITIATED OR REQUESTED BY: REPORT COORDINATED OR PREPARED BY:
[ ] Council [X] Staff
[ ] Other
Bridget K. McGinnis, Assistant Engineer
Capital Projects Department
ATTACHMENT [X] Yes [ ] No [ ] Information [ ] Direction [X] Action
OBJECTIVE
The objective of this report is to provide the City Council with sufficient information to approve a professional services contract with Schaaf & Wheeler for engineering services for the Bryte Sewer Pump Station Rehabilitation Project (CIP 33031).
RECOMMENDED ACTION
Staff respectfully recommends that the City Council:
1) Award a professional services contract with Schaaf & Wheeler for engineering services for the Bryte Sewer Pump Station Rehabilitation Project (CIP 33031);
2) Authorize the City Manager, or his designee, to execute a professional services contract with Schaaf & Wheeler in an amount not to exceed $1,001,540, which includes any optional tasks; 3) Delegate authority to the City Manager, or his designee, to authorize any optional tasks. Optional tasks will remain optional unless and until expressly authorized in writing; 4) Authorize the City Manager or his designee to make contract amendments up to 10% ($100,154) of the total value of the contract;
5) Authorize the City Manager, or his designee, to execute non-substantive changes or modifications to this professional services contract, with approval from the City Attorney; and 6) Authorize the City Manager, or his designee, to execute amendments to extend the term of this contract, if necessary.
BACKGROUND
The Bryte Sewer Pump Station, located at the eastern end of Citrus Street, is a critical component of the City of West Sacramento’s wastewater conveyance system. Originally constructed in 1984 and last significantly upgraded in 2008, the station receives wastewater from its surrounding tributary area as well as flows conveyed from the Coke Lift Station.
In conjunction with the General Plan 2035, the City prepared the 2024 Sewer Master Plan Update to evaluate the condition and hydraulic capacity of the existing sewer conveyance system and identify improvements needed to maintain reliable wastewater service. The Sewer Master Plan identified the Bryte Sewer Pump Station as one of the City’s most critical infrastructure priorities. Hydraulic modeling indicates that the station has the largest capacity shortage in the City during peak wet weather conditions.
To address these deficiencies, the City established the Bryte Sewer Pump Station Rehabilitation Project (CIP 33031). The project will evaluate and design substantial improvements to the existing facility. The design will evaluate improvements such as rehabilitation of existing components, construction of new pump station facilities, conversion to a submersible pump configuration, replacement of aging mechanical and electrical equipment, and upgrades to controls, monitoring, emergency power, and site access. These improvements will increase the station’s reliability, efficiency, and maintainability, improve its ability to manage peak wet weather flows, and reduce the risk of equipment failures, service disruptions, and sewer overflows.
The resulting recommendation includes a professional services contract that covers the full project lifecycle, including field investigations (geotechnical and topographic survey), preliminary design, final construction documents, PS&E (plans, specifications, and estimates), bidding support, and engineering services during construction.
37 Bryte Sewer Pump Station Rehabilitation – Shaaf & Wheeler August 19, 2026
ANALYSIS
On May 8, 2026, the City solicited proposals for professional engineering services for the Bryte Sewer Pump Station Rehabilitation Project (25-110-RFP) through the City’s online procurement system, OpenGov, to obtain proposals from engineering firms to conduct surveying, engineering reports preparation, environmental analysis and permitting, public outreach, utility coordination, right-of-way activities, PS&E, and design and support services. Two addenda were published during the solicitation period to clarify project requirements. On June 25, 2026, the City received six (6) proposals from the following qualified firms:
• Alisto Inc.
• BKF Engineers
• Bennett Engineering Services
• HDR Engineering, Inc.
• Schaaf & Wheeler
• Water Works Engineers, LLC.
The proposals were evaluated by a panel of City staff, consistent with the City’s purchasing policy. Proposals were evaluated based on firm qualifications, experience with comparable wastewater infrastructure projects, the expertise of key personnel, technical approach, and acceptance of the City’s standard contract. After reviewing Schaaf & Wheeler's qualifications, experience, and proposed technical approach, the staff selection panel determined that Schaaf & Wheeler has a strong understanding of the work to be performed and is qualified to provide engineering design services. Selection was based on the firm's experience with complex wastewater pump station projects and hydraulic systems, its understanding of the project's technical challenges, and its proposed approach to project implementation and sequencing. The attached contract includes the negotiated scope and fees to complete the assignment.
Environmental Considerations
This action is not a “project” for the purposes of the California Environmental Quality Act, Public Resources Code section 21000 et seq. (“CEQA”), because it is not an activity that may cause either a direct or reasonably foreseeable indirect physical change in the environment and, therefore, pursuant to Public Resources Code section 21065 and CEQA Guidelines sections 15060(c) and 15378(a), it is not subject to environmental review.
Environmental documentation required for the project will be conducted during the project development.
Commission Recommendation
Not applicable.
Strategic Plan Integration
Not applicable.
Alternatives
Following are the City Council’s primary action alternatives:
1) Approve the recommended actions as stated above.
2) Modify or defer the recommended actions.
3) Elect not to proceed with the recommended actions or cancel the project.
Staff recommends Alternative 1 in order to facilitate the design in a timely manner and to meet the overall project schedule. Alternatives 2 and 3 are not recommended because they would delay the project.
Coordination and Review
This report was prepared by the Capital Projects Department in coordination with and review by the Public Works Operations and Maintenance Department and the Finance Department.
Budget/Cost Impact
This project is included in the City’s current Capital Improvement Program (CIP) as CIP 33031: Bryte Pump Station Rehabilitation Project. The project is funded through the design phase by the City’s Sewer Impact Fee (Fund 502). There are currently sufficient funds in this CIP to award the contract Schaaf & Wheeler Civil Engineering Services.
ATTACHMENTS
1) Vicinity Map
2) CPE26-275 Contract Schaaf & Wheeler
38 Union Pacific Rail road
Sierra Rail road
84 84
Maple S t
Yolo
S t
Yolo S t
Dobros Dr
Mikon St
Bryte
Ave
Rice Ave
Washington
Ave
Citrus St
Sacramento Ave
Holly S t
Maple S t
Rice Ave
Washington Ave
Mikon St
0 370
US Feet
¯
Project Limits
Prepared on
7/28/2026 by
manuelr
Capital Projects
Department
City of West Sacramento
1596 Citrus Street
Bryte Sewer Lift Station Rehabilitation Project
Attachment 1
80 S ACRAM E N T
5 West
Sacramento
Project
Location
39 Schaaf & Wheeler, Consulting Civil Engineers
CPE26-275 – Bryte Sewer Pump Station Rehabilitation
Expires on 8/19/2029
1 11/4/24
CONTRACT FOR SERVICES
THIS CONTRACT is made on August 19, 2026, by and between the CITY OF WEST SACRAMENTO (“City”), and Schaaf & Wheeler, Consulting Civil Engineers (“Consultant”).
WITNESSETH:
WHEREAS, the City desires a consultant to provide engineering and design services for the Bryte Sewer Pump Station Rehabilitation Project; and WHEREAS, the Consultant has presented a proposal for such services to the City, dated June 25, 2026, (attached hereto as Exhibit “A”) and is duly licensed, qualified and experienced to perform those services; and
NOW, THEREFORE, the parties hereto mutually agree as follows:
1. SCOPE OF SERVICES:
A. Consultant shall do all work, attend all meetings, produce all reports and carry out all activities necessary to completion of the services described in Exhibit A. This Contract and its exhibits shall be known as the “Contract Documents.” Terms set forth in any Contract Document shall be deemed to be incorporated in all Contract Documents as if set forth in full therein. In the event of conflict between terms contained in these Contract Documents, the more specific term shall control. If any portion of the Contract Documents shall be in conflict with any other portion, provisions contained in the Contract shall govern over conflicting provisions contained in the exhibits to the Contract.
B. Consultant enters into this Contract as an independent contractor and not as an employee of the City. The Consultant shall have no power or authority by this Contract to bind the City in any respect. Nothing in this Contract shall be construed to be inconsistent with this relationship or status. All employees, agents, contractors or subcontractors hired or retained by the Consultant are employees, agents, contractors or subcontractors of the Consultant and not of the City. The City shall not be obligated in any way to pay any wage claims or other claims made against Consultant by any such employees, agents, contractors or subcontractors, or any other person resulting from performance of this Contract. In the event that Consultant or any employee, agent, or subcontractor of Consultant providing services under this Agreement claims or is determined by a court of competent jurisdiction or the California Public Employees Retirement System (PERS) to be eligible for enrollment in PERS as an employee of the City, Consultant shall indemnify, defend, and hold harmless City for the payment of any employee and/or employer contributions for PERS benefits on behalf of Consultant or its employees, agents, or subcontractors, as well as for the payment of any penalties and interest on such contributions, which would otherwise be the responsibility of City. Notwithstanding any other agency, state or federal policy, rule, regulation, law or ordinance to the contrary, To the greatest extent permitted by law, Consultant and its employees, agents, and subcontractors shall not qualify for or become entitled to, and hereby agree to waive any claims to, any compensation, benefit, or any incident of employment by City, including but not limited to eligibility to enroll in PERS as an employee of City and entitlement to any contribution to be paid by City for employer contribution and/or employee contributions for PERS benefits.
40 Schaaf & Wheeler, Consulting Civil Engineers
CPE26-275 – Bryte Sewer Pump Station Rehabilitation
Expires on 8/19/2029
2 11/4/24
C. The Consultant agrees it has satisfied itself by its own investigation and research regarding the conditions affecting the work to be done and labor and materials needed, and that its decision to execute this Contract is based on such independent investigation and research.
2. TERM OF CONTRACT
A. The services of Consultant are to commence upon execution of this Contract by the City, and shall be undertaken and completed in accordance with the Schedule of Performance attached hereto and incorporated herein by this reference as Exhibit “B” and terminate on August 19, 2029.
B. Consultant’s failure to complete work in accordance with the Schedule of Performance may result in delayed compensation as described in Section 3.
C. The City Manager or his or her designee may, by written instrument signed by the Parties, extend the duration of this Contract for two (2) additional one-year extensions in the manner provided in Section 5, provided that the extension does not require the payment of compensation in excess of the Council approved budget.
3. COMPENSATION:
A. The Consultant shall be paid monthly for the actual fees, costs and expenses for all time and materials required and expended, but in no event shall total compensation exceed one-million one-thousand five-hundred forty dollars ($1,001,540.00), without City’s prior written approval. Consultant's fees shall be as specified in the Schedule of Fees, which is attached hereto an incorporated herein as Exhibit "C".
B. Said amount shall be paid upon submittal of a monthly billing showing completion of the tasks that month. Consultant shall furnish City with invoices for all expenses as well as for all materials authorized by this Contract. The invoices shall be submitted with the monthly billings.
If Consultant’s performance is not in conformity with the Schedule of Performance, payments may be delayed or denied, unless the Consultant’s failure to perform in conformity with the Schedule of Performance is a documented result of the City’s failure to conform with the Schedule of Performance, or if the Schedule of Performance is extended pursuant to Section 5.
C. If the work is halted at the request of the City, compensation shall be based upon the proportion that the work performed bears to the total work required by this Contract, subject to Section 4.
4. TERMINATION:
A. This Contract may be terminated by either party, provided that the other party is given not less than 30 calendar days’ written notice (delivered by certified mail, return receipt requested) of intent to terminate.
B. The City may temporarily suspend this Contract, at no additional cost to City, provided that the Consultant is given written notice (delivered by certified mail, return receipt requested) of temporary suspension. If City gives such notice of temporary suspension, Consultant shall immediately suspend its activities under this Contract. 41 Schaaf & Wheeler, Consulting Civil Engineers
CPE26-275 – Bryte Sewer Pump Station Rehabilitation
Expires on 8/19/2029
3 11/4/24
C. Notwithstanding any provisions of this Contract, Consultant shall not be relieved of liability to the City for damages sustained by the City by virtue of any breach of this Contract by Consultant, and the City may withhold any payments due to Consultant until such time as the exact amount of damages, if any, due the City from Consultant is determined.
D. In the event of termination, the Consultant shall be compensated as provided for in this Contract, except as provided in Section 4C. Upon termination, the City shall be entitled to all work, including but not limited to, appraisals, inventories, studies, analyses, drawings and data estimates performed to that date in accordance with Section 7 hereof.
5. AMENDMENTS, CHANGES OR MODIFICATIONS:
Amendments, changes or modifications in the terms of this Contract may be made at any time by mutual written agreement between the parties hereto and shall be signed by the persons authorized to bind the parties hereto.
6. EXTENSIONS OF TIME:
Consultant may, for good cause, request extensions of time to perform the services required hereunder. Such extensions shall be authorized in advance by the City in writing and shall be incorporated in written amendments to this Contract or the attached Work Program in the manner provided in Section 5.
7. PROPERTY OF CITY:
A. It is mutually agreed that all materials prepared by the Consultant under this Contract shall become the property of the City, and the Consultant shall have no property right therein whatsoever. Immediately upon termination, the City shall be entitled to, and the Consultant shall deliver to the City, all data, drawings, specifications, reports, estimates, summaries and other such materials as may have been prepared or accumulated to date by the Consultant in performing this Contract which is not Consultant’s privileged information, as defined by law, or Consultant’s personnel information, along with all other property belonging exclusively to the City which is in the Consultant’s possession.
B. The reuse of any of the materials or documents described in Paragraph 7.A by the City on any other project without the written permission of the Consultant, shall be at the City's sole risk and the City agrees to defend, indemnify and hold harmless the Consultant from all claims, damages and expenses, including attorney's fees, arising out of such unauthorized reuse by the City or by others acting through the City. The Consultant is not responsible and liability is waived by the City as against the Consultant for use by the City or any other person of any data, reports, plans or drawings not signed by the Consultant.
8. COMPLIANCE WITH ALL LAWS:
A. Consultant shall comply with all applicable laws, ordinances, and codes of federal, State and local governments, and shall commit no trespass on any public or private property in performing any of the work authorized by this Contract.
B. Consultant warrants to the City that it is licensed by all applicable governmental bodies to perform this Contract and will remain so licensed throughout the progress of the Work, 42 Schaaf & Wheeler, Consulting Civil Engineers
CPE26-275 – Bryte Sewer Pump Station Rehabilitation
Expires on 8/19/2029
4 11/4/24
and that it has, and will have, throughout the progress of the Work, the necessary experience, skill and financial resources to enable it to perform this Contract.
C. The work contemplated under this Contract is a public work for the purposes of Labor Code section 1720, and is subject to the payment of prevailing wages. Accordingly, Consultant shall comply with the provisions of Exhibit "D".
9. WARRANTIES AND RESPONSIBILITIES - CONSULTANT:
A. Consultant agrees and represents that it is qualified to properly provide the services set forth in Exhibit “A” in a manner which is consistent with the generally accepted standards of Consultant’s profession.
B. Consultant agrees and represents that the work performed under this Contract shall be in accordance with applicable federal, State and local law in accordance with Section 17A hereof.
C. Consultant shall designate a project manager who at all times shall represent the Consultant before the City on all matters relating to this Contract. The project manager shall continue in such capacity unless and until he or she is removed at the request of the City, is no longer employed by Consultant, or is replaced with the written approval of the City, which approval shall not be unreasonably withheld.
D. Consultant shall provide corrective services without charge to the City for services which fail to meet the above professional and legal standards and which are reported to Consultant in writing within sixty (60) days of discovery. Should Consultant fail or refuse to perform promptly its obligations, the City may render or undertake performance thereof and the Consultant shall be liable for any expenses thereby incurred.
10. SUBCONTRACTING:
None of the services covered by this Contract shall be subcontracted without the prior written consent of the City, which will not be unreasonably withheld. Consultant shall be as fully responsible to the City for the negligent acts and omissions of its contractors and subcontractors, and of persons either directly or indirectly employed by them, as it is for the negligent acts and omissions of persons directly employed by Consultant.
11. ASSIGNABILITY:
Consultant shall not assign or transfer any interest in this Contract whether by assignment or novation, without the prior written consent of the City which will not be unreasonably withheld.
However, claims for money due or to become due Consultant from the City under this Contract may be assigned to a financial institution, or to a trustee in bankruptcy, without such approval.
Notice of any assignment or transfer whether voluntary or involuntary shall be furnished promptly to the City.
12. INTEREST IN CONTRACT:
Consultant covenants that neither it, nor any of its employees, agents, contractors, subcontractors has any interest, nor shall they acquire any interest, direct or indirect, in the subject of the Contract, nor any other interest which would conflict in any manner or degree with the 43 Schaaf & Wheeler, Consulting Civil Engineers
CPE26-275 – Bryte Sewer Pump Station Rehabilitation
Expires on 8/19/2029
5 11/4/24
performance of its services hereunder. Consultant shall make all disclosures required by the City’s conflict of interest code in accordance with the category designated by the City, unless the City Manager determines in writing that Consultant’s duties are more limited in scope than is warranted by the category designated by the City code and that a narrower disclosure category should apply. Consultant also agrees to make disclosure in compliance with the City conflict of interest code if, at any time after the execution of this Contract, City determines and notifies Consultant in writing that Consultant’s duties under this Contract warrant greater disclosure by Consultant than was originally contemplated. Consultant shall make disclosures in the time, place and manner set forth in the conflict of interest code and as directed by the City.
13. MATERIALS CONFIDENTIAL:
All of the materials prepared or assembled by Consultant pursuant to performance of this Contract are confidential and Consultant agrees that they shall not be made available to any individual or organization without the prior written approval of the City, except by court order.
14. LIABILITY OF CONSULTANT-NEGLIGENCE:
Consultant shall be responsible for performing the work under this Contract in a manner which is consistent with the generally-accepted standards of the Consultant’s profession and shall be liable for its own negligence and the negligent acts of its employees, agents, contractors and subcontractors. The City shall have no right of control over the manner in which the work is to be done but only as to its outcome, and shall not be charged with the responsibility of preventing risk to Consultant or its employees, agents, contractors or subcontractors.
15. INDEMNITY AND LITIGATION COSTS:
Consultant shall protect, hold free and harmless, defend and indemnify the City, its consultants, and each of their officers, employees and agents, from any and all liability, penalties, costs, losses, damages, expenses, causes of action, claims or judgments, including attorney’s fees and expenses of litigation arising out of, pertaining to, or relating to the negligence, recklessness, or willful misconduct of the Consultant, its employees or anyone else employed by the Consultant in the performance of professional design services under this agreement, to the extent of the Consultant’s proportionate percentage of fault.
To the extent permitted by Civil Code section 2782.8, for all other claims unrelated to the provision of professional design services, the Consultant shall protect, hold free and harmless, defend and indemnify the City, its consultants, and each of their officers, employees and agents, from any and all liability, penalties, costs, losses, damages, expenses, causes of action, claims or judgments, including attorney’s fees and expenses of litigation, which arise out of or are in any way connected with the Consultant’s, or its subcontractors’ or suppliers’, performance under this agreement or failure to comply with any of the obligations contained in the agreement. This indemnity shall imply no reciprocal right of the Consultant in any action on the agreement pursuant to California Civil Code section 1717 or section 1717.5. To the fullest extent legally permissible, this indemnity, defense and hold harmless agreement by the Consultant shall apply to any and all acts or omissions unrelated to the provision of professional design services, whether active or passive, on the part of the Consultant or its agents, employees, representatives, or subcontractor’s agents, employees and representatives, resulting in claim or liability, irrespective of whether or not any acts or omissions of the parties to be indemnified hereunder may also have been a contributing factor to the liability, except such loss or damage which was caused by the 44 Schaaf & Wheeler, Consulting Civil Engineers
CPE26-275 – Bryte Sewer Pump Station Rehabilitation
Expires on 8/19/2029
6 11/4/24
active negligence, the sole negligence, or the willful misconduct of the City.
16. CONSULTANT TO PROVIDE INSURANCE:
A. Consultant shall not commence any work before obtaining, and shall maintain in force at all times during the duration and performance of this Contract, the policies of insurance specified in this Section. Such insurance must have the approval of the City as to limit, form, and amount, and shall be placed with insurers with a current A.M. Best’s rating of no less than A VII (an NR rating is acceptable for Worker’s Compensation insurance written with the State Compensation Insurance Fund of California).
B. Prior to execution of this Contract and prior to commencement of any work, the Consultant shall furnish the City with certificates of insurance and copies of endorsements providing evidence of coverage for all policies required by the Contract. The Consultant and its contractors and subcontractors shall, at their expense, maintain in effect at all times during the performance of work under the Contract not less than the following coverage and limits of insurance, which shall be maintained with insurers and under forms of policy satisfactory to the City. The maintenance by Consultant and its contractors and subcontractors of the following coverage and limits of insurance is a material element of this Contract. The failure of Consultant or of any of its contractors or subcontractors to maintain or renew coverage or to provide evidence of renewal may be treated by the City as a material breach of this Contract. Approval of the insurance by the City shall not relieve or decrease any liability of Consultant.
1. Worker’s Compensation and Employer’s Liability Insurance
a. Worker’s Compensation - Insurance to protect the Consultant, its contractors and subcontractors from all claims under Worker’s Compensation and Employer’s Liability Acts, including Longshoremen’s and Harbor Worker’s Act (“Acts”), if applicable. Such coverage shall be maintained, in type and amount, in strict compliance with all applicable state and Federal statutes and regulations.
The Consultant shall execute a certificate in compliance with Labor Code Section 1861, on the form provided in the Contract Documents.
b. Consultant shall provide a Waiver of Subrogation endorsement in favor of the City, its officers, officials, employees, agents and volunteers for losses arising from work performed by the Consultant.
2. Commercial General Liability Insurance
a. The insurance shall be provided on form CG0001, or it’s equivalent, and shall include coverage for claims for bodily injury or property damage arising out of premises/operations, products/completed operations, contractual liability, and subconsultant’s work and personal and advertising injury resulting from actions, failures to act, or operations of the insured, or by its employees or agents, or by anyone directly or indirectly employed by the insured. The amount of insurance coverage shall not be less than $1,000,000 per occurrence and $2,000,000 general and products/completed operations aggregates. b. The commercial general liability insurance shall also include the following:
45 Schaaf & Wheeler, Consulting Civil Engineers
CPE26-275 – Bryte Sewer Pump Station Rehabilitation
Expires on 8/19/2029
7 11/4/24
i. Endorsement equivalent to CG 2010 0714 naming the City, its officers, officials, employees, agents, and volunteers as additional insureds. The endorsement shall contain no special limitations on the scope of protection afforded to the City, its officers, officials, employees or volunteers.
ii. Endorsement stating insurance provided to the City shall be primary as respects the City, its officers, officials, employees and any insurance or self insurance maintained by the City, its officers, officials, employees or volunteers shall be in excess of the Consultant’s insurance and shall not contribute with it, to the payment or satisfaction of any defense expenses, loss, or judgment.
iii. Provision or endorsement stating that the Consultant’s insurance shall apply separately to each insured against whom claim is made or suit is brought, except with respect to the limits of the insurer’s liability.
3. Commercial Automobile Insurance
a. The insurance shall include, but shall not be limited to, coverage for claims for bodily injury or property damage for owned, non-owned, and hired automobiles resulting from actions, failures to act, or operations of the insured, or by its employees or agents, or by anyone directly or indirectly employed by the insured. The amount of insurance coverage shall not be less than $1,000,000 per accident.
b. The commercial automobile insurance shall include the same endorsements required for the commercial general liability policy (see Section
16.B.2.b).
4. Professional Liability. The Consultant and its contractors and subcontractors shall secure and maintain in full force, during the term of this Contract and for five years thereafter, professional liability insurance policies appropriate to the respective professions and the work to be performed as specified in this Contract. The limits of such professional liability insurance coverage shall not be less than $1,000,000 per claim.
C. In addition to any other remedy the City may have, if Consultant fails to maintain the insurance coverage as required in this Section, the City may obtain such insurance coverage as is not being maintained, in form and amount substantially the same as is required herein, and the City may deduct the cost of such insurance from any amounts due or which may become due Consultant under this Contract.
D. No policy required by this Contract shall be suspended, cancelled, terminated by either party, or reduced in coverage or in limits unless Consultant has provided thirty (30) days prior written notice by certified mail, return receipt requested, to the City.
E. Any deductibles or self-insured retentions in excess of $10,000 must be declared to, and approved by, the City.
46 Schaaf & Wheeler, Consulting Civil Engineers
CPE26-275 – Bryte Sewer Pump Station Rehabilitation
Expires on 8/19/2029
8 11/4/24
F. The requirement as to types, limits, and the City’s approval of insurance coverage to be maintained by Consultant are not intended to, and shall not in any manner, limit or qualify the liabilities and obligations assumed by Consultant under the Contract.
17. MISCELLANEOUS PROVISIONS:
A. Consultant shall keep itself fully informed of, shall observe and comply with, and shall cause any and all persons, firms or corporations employed by it or under its control to observe and comply with, applicable federal, state, county and municipal laws, ordinances, regulations, orders and decrees which in any manner affect those engaged or employed on the work described by this Contract or the materials used or which in any way affect the conduct of the work.
B. Consultant shall not engage in unlawful employment discrimination. Such unlawful employment discrimination includes, but is not limited to, employment discrimination based upon a person’s race, religious creed, color, national origin, ancestry, physical handicap, medical condition, marital status, gender, citizenship, or sexual orientation.
C. Consultant shall maintain and make available for inspection by the City and its auditors accurate records of all of its costs, disbursements and receipts with respect to any work under this Contract. Such inspections may be made during regular office hours at any time until six (6) months after the final payments under this Contract are made to the Consultant.
D. This Contract constitutes the entire agreement between the parties relative to the services specified herein and no modification hereof shall be effective unless and until such modification is evidenced by a writing signed by both parties to this Contract. There are no understandings, agreements, conditions, representations, warranties or promises, with respect to this Contract, except those contained in or referred to in the writing.
E. All notices that are required to be given by one party to the other under this Contract shall be in writing and shall be deemed to have been given if delivered personally or enclosed in a properly addressed envelope and deposited in a United States Post Office for delivery by registered or certified mail addressed to the parties at the following addresses:
City: City of West Sacramento
Attn to: Bridget McGinnis
1110 West Capitol Ave. 1st Floor
West Sacramento, CA 95691
Email: [email protected]
Consultant: Schaaf & Wheeler, Consulting Civil Engineers Attn to: Glen Anderson
4699 Old Ironsides Drive, Suite 350
Santa Clara, CA 95054
Email: [email protected]
H. This Contract shall be interpreted and governed by the laws of the State of California.
47 Schaaf & Wheeler, Consulting Civil Engineers
CPE26-275 – Bryte Sewer Pump Station Rehabilitation
Expires on 8/19/2029
9 11/4/24
I. Any action arising out of this Contract shall be brought and maintained in Yolo County California, regardless of where else venue may lie.
J. In any action brought by either party to enforce the terms of this Contract, each party shall be bear responsibility for its attorney’s fees and all costs regardless of whether one party is determined to be the prevailing party.
K. ELECTRONIC TRANSMISSION OF CONTRACT AND SIGNATURE. By electronically signing this document in electronic form, Parties agree that this Agreement may be transmitted and signed electronically by all Parties, and that such signatures shall have the same force and effect as original signatures, in accordance with California law and regulations, including but not limited to Civil Code Section 1633.7
[Signatures on following page]
48 Schaaf & Wheeler, Consulting Civil Engineers
CPE26-275 – Bryte Sewer Pump Station Rehabilitation
Expires on 8/19/2029
10 11/4/24
CITY OF WEST SACRAMENTO:
By: __________________________
Amanda Berlin, Assistant City Manager
ATTEST:
By: _______________________
Jennifer Cusmir, City Clerk
APPROVED AS TO FORM:
By: _______________________
Jeffrey Mitchell, City Attorney
SCHAAF & WHEELER
By: _________________________
Glen M. Anderson, Vice President
49 Schaaf & Wheeler, Consulting Civil Engineers
CPE26-275 – Bryte Sewer Pump Station Rehabilitation
Expires on 8/19/2029
EXHIBIT A
Consultant Proposal/Scope of Work
50 Local Benefit Proposal
June 25, 2026
Organization & Contact Information Project Description & Services Provided Ana Chiono, Project Manager
City of Stockton
425 N. El Dorado St.
Stockton, CA 95202
(209) 937-5650
[email protected]
Designed sanitary sewer system facilities that pump and convey the downtown flows to the Regional Wastewater Control Facility Prepared the PS&E and construction bid documents of the new sanitary sewer pump station, force main, gravity mains, and lateral replacements
Coordinated with subconsultants for field survey, utility location, environmental support, geotechnical investigation, and electrical and structural design
6. Local Benefit
Although we do not currently claim a local vendor preference as defined by the RFP, Schaaf & Wheeler will provide meaningful and measurable local and regional benefit to the City of West Sacramento through nearby staffing, regional subconsultant participation, responsive in-person availability, and use of local vendors. Schaaf & Wheeler maintains 4 offices within approximately 100 miles of West Sacramento, allowing the City to be served by staff who are familiar with Northern California public wastewater infrastructure. Our team also includes local and regional subconsultants with completed and ongoing project experience in the West Sacramento/Yolo County area, including Kier+Wright, Onterris, and Presidio Systems, Inc. Schaaf & Wheeler will obtain and retain a West Sacramento business license during the contract. At the conclusion of the contract, Schaaf & Wheeler will provide a summary of measurable local and regional benefits.
7. Project Scope
7.1 Task 1: Project Management
Task 1.1 Project Management
This task includes project management, administration, City coordination, consultant team coordination, and regular status and schedule updates with monthly invoicing. For scoping purposes, the following meetings are assumed:
Monthly design coordination calls via Microsoft Teams (12 assumed; 1 hour each) Kick-Off Meeting
Roundtable Meeting
Design and Deliverable meetings
o 5 Design Meetings (Preliminary Design Draft & Final, 65%, 95%, and Final Design) Task 1.2 Public Meetings
This task includes attendance at up to three public meetings, including neighborhood meetings, City Council meetings, or other public forums. Schaaf & Wheeler will prepare up to two supplemental exhibits per meeting to support public understanding of the project need, construction impacts, long-term benefits, and other key project considerations.
7.2 Task 2: Preliminary Design Memorandum and Field Investigations Task 2.1 Survey
Our subconsultant, Kier + Wright will perform field surveying and topographic mapping for the Bryte Sewer Pump Station Rehabilitation. Survey work will capture existing site conditions, including subsurface utility locations. They will capture and confirm existing site conditions, property and easement limits, rightof-way constraints, structure footprints, utilities, surface features, critical flowlines, and key wastewater infrastructure, including the influent gravity main and force main discharge piping. Mapping will incorporate available record information, title and right-of-way research as needed, utility conflict and potholing information where applicable, adjacent railroad and regional wastewater facility constraints, and FEMA 100-year base flood elevation information where applicable. Survey deliverables will be prepared in a format suitable for design drawings and for coordination with right-of-way, environmental, permitting, and constructability evaluations.
11 51
Project Scope Proposal
June 25, 2026
Task 2.2 Geotechnical
Our subconsultant, Cornerstone Earth Group will prepare a geotechnical engineering report to characterize subsurface, groundwater, and soil conditions for the pump station rehabilitation and conversion to a submersible pump configuration. Work will include up to two 40-foot soil borings; coring of the existing dry well sidewall; soil and groundwater corrosivity evaluation; groundwater and dewatering considerations; seismic and foundation design parameters; excavation support recommendations; and evaluation of settlement; ground movement, uplift, pipe displacement, and constructability risks.
Cornerstone will also complete a Phase I Environmental Site Assessment and Soil Quality Evaluation.
Recommendations will address foundations, underground structures, pipelines, shoring, dewatering, subgrade preparation, compaction, pipe stiffness, and pipe rating selection, and will be coordinated with final design development.
Task 2.3 Condition Assessment
Schaaf & Wheeler will review available information, identify data gaps, and conduct a site visit to verify existing conditions and discuss operations and maintenance with City staff. Following the site visit, the team will participate in a data review roundtable meeting with all stakeholders to confirm gaps in data, assumptions, preferred materials, configurations, alternatives, and operational considerations with the station operators and City engineers.
Schaaf & Wheeler, with electrical and structural subconsultants TJCAA and BCA, will assess existing Bryte Sewer Pump Station facilities for structural integrity, operational condition, and suitability for rehabilitation or continued use. The assessment will include the control and electrical building, electrical equipment, PG&E service, backup power, dry well, wet well, bypass vault, downstream force main, and approximately 3,620 linear feet of upstream 18-inch influent sewer. Work will document facility configuration, equipment information, wet well conditions using non-entry camera inspection, electrical and control system condition, known defects, operational issues, settlement, ground movement, piping displacement, structural distress, corrosion, and related deficiencies. Findings will be summarized in a Condition Assessment Report with recommended corrective actions.
Our subconsultant, Presidio Systems, Inc. will assess approximately 3,620 linear feet of piping. Schaaf & Wheeler will use the National Association of Sewer Service Companies (NASSCO) Pipeline Assessment Certification Program (PACP) standards version 8 to classify pipe conditions as a basis for prioritizing and recommending improvements to sewer mains. Schaaf & Wheeler will couple the PACP rating for each pipe and detailed reviews of the inspection footage to assign a prioritization score for the urgency of the rehabilitation. The prioritization score is primarily based on the structural integrity of the sewer, inflow and infiltration impacts, and is intended to minimize the risk of sanitary sewer overflows (SSOs). These rankings will be included in the condition assessment report.
Schaaf & Wheeler will also complete a desktop study and field data collection for the downstream force main and related pump stations. Work will include developing a representative system curve, reviewing as-built information, and completing drawdown testing at strategic pump stations to calibrate system head loss, firm capacity, and station capacity impacts with Bryte Pump Station operation. We will use these results to evaluate force main condition using field-calibrated Hazen-Williams coefficients and to recommend any further investigations. Based on preliminary analysis, the force main appears undersized, so additional investigation may not be the best use of project funds; however, a field testing allowance is included under Task 7.
Task 2.4 Preliminary Design Memorandum
Schaaf & Wheeler and our subconsultants TJCAA and BCA will prepare a Preliminary Design Memorandum documenting the Basis of Design and recommended rehabilitation approach for contract document development. The memorandum will summarize field investigations, condition assessments, hydraulic evaluations, pump selections, electrical and controls reviews, electrical service adequacy, backup power, building rehabilitation or replacement alternatives, geotechnical findings, and related technical studies. The memorandum will also evaluate site and civil improvements, submersible pump station configuration, critical elevations, hydraulic and firm capacity requirements, pump replacement needs, wet well configuration, standby power, emergency storage, electrical systems, controls, SCADA integration, corrosion protection, maintenance access, and operational reliability. The memorandum will 12 52
Project Scope Proposal
June 25, 2026
compare rehabilitation and replacement alternatives, cost estimates, and capacity scenarios related to future infiltration and inflow (I&I) reduction efforts, and will identify the recommended design alternative, assumptions, constraints, and design considerations.
7.3 Task 3 Contract Documents
Task 3.1 65% Contract Documents
The 65% design submittal will establish the major project elements and include civil, mechanical, electrical, and SCADA-related components. Anticipated content includes civil notes, demolition plans, grading, site plans, pipeline plans and sections, mechanical plans and sections, electrical site plans, single-line diagrams, SCADA coordination drawings, project-specific details, standard details, construction notes, and draft staging areas. The submittal will also include a specification index, major project-specific specifications, calculations, technical data, maintenance considerations, equipment catalog cuts, construction cost estimate, and schedule.
Schaaf & Wheeler will coordinate with utility agencies and identify potential relocations, if needed.
Existing utilities will be shown on the drawings. If the preliminary design confirms that PG&E electrical service upgrades are needed, TJCAA will coordinate with PG&E and prepare service application documents. Coordination with the City’s SCADA consultants will also be performed for programmable logic controller (PLC) and control system programming and integration.
Task 3.2 95% Contract Documents
After City and stakeholder review of the 65% submittal and authorization to proceed, Schaaf & Wheeler will prepare the 95% design submittal. The submittal will address review comments and further refine drawings, civil and electrical plans, details, final staging areas, structural notes, plans, and details. The 95% package will also include completed specifications, updated civil, structural, and electrical calculations, technical data, maintenance considerations, equipment catalog cuts, an updated construction cost estimate, and construction schedule. Schaaf & Wheeler will continue coordination with the City’s SCADA consultant for PLC and control system programming.
Task 3.3 Final Contract Documents
Following resolution of City comments on the 95% submittal and City approval, Schaaf & Wheeler will prepare the final design submittal. The final package will incorporate review comments and include complete construction drawings, specifications, cost estimate, and probable construction schedule. The final design package will be prepared for signature, submitted for final City review and approval, and finalized as bid-ready documents after addressing any remaining comments or clarification requests.
Task 3.4 Constructability Review and Update
Schaaf & Wheeler will coordinate with the City’s Construction Manager (CM) as needed for them to perform a constructability review of the plans, specifications, and supporting technical information. Based on the constructability review, Schaaf & Wheeler will coordinate with the CM and the City to deliver a final Bid Package for Contract Documents.
7.4 Task 4 Bid Support
During the bid phase, our team will respond to written questions from prospective bidders, provide design clarifications, and assist the City with preparation of addenda, as directed. If requested, we will also attend the pre-bid meeting.
7.5 Task 5 Engineering Support During Construction
Task 5.1 Engineering Support During Construction
During construction, Schaaf & Wheeler’s scope includes the following:
Attendance at the pre-construction meeting
Participation in weekly construction coordination meetings as needed (assumes 10) Review and respond to shop drawings and submittals (80 Submittals; 40 Resubmittals), change order requests (up to 10), and requests for information (580 RFIs) Participation in punch list walkthrough and development of the punch list 13 53
Project Approach Proposal
June 25, 2026
Task 5.2 Record Drawings
At project closeout, Schaaf & Wheeler and its subconsultants will prepare record drawings based on contractor-provided markups, incorporating RFI responses and other contract changes.
7.6 Task 6 Environmental Clearance
Our subconsultant Onterris will assist with environmental clearance for the Bryte Sewer Pump Station Rehabilitation Project. Although our preliminary review indicates that the project may qualify for a Categorical Exemption, Onterris will complete a preliminary environmental review and CEQA pathway findings memorandum to identify potential constraints, confirm the appropriate CEQA path, and evaluate whether existing City documentation or prior environmental review may support a streamlined approach.
If the findings confirm that a Categorical Exemption is appropriate, Onterris will prepare a Categorical Exemption Memorandum and Notice of Exemption support document. If a different CEQA approach is recommended, Onterris can prepare the required CEQA documentation as additional scope.
7.7 Task 7 Optional Tasks
Task 7.1 Appraisals, Appraisal Reviews, and Property Rights Support Schaaf & Wheeler does not anticipate that property acquisition will be required for the Bryte Pump Station Project. Schaaf & Wheeler will, to the extent possible, design all improvements within City-owned properties, easements, and public rights-of-way. If unforeseen conditions lead to the requirement of clarification of property boundaries, additional easements, or limited property rights, our subconsultant Associated Right of Way Service (AR/WS), at the City’s direction, will prepare appraisals in accordance with the Uniform Relocation Assistance and Real Property Acquisition Act and the Uniform Standard of Professional Appraisal Practice, in compliance with California Eminent Domain law. They may also act as appraisal reviewers in accordance with the Uniform Act and prepare a Review Appraiser Certificate.
Property rights support may also include preparation of written offers, acquisition documentation, or negotiation assistance, as requested by the City. This work assumes non-complex acquisitions (no damage or impacts to buildings or other major improvements) and non-complex property types (no contaminated, publicly-owned, or special-use parcels); No relocation assistance will be necessary; and no federal funding will be used. Two of the three sides of the City’s lot are bounded by railroad property.
Because it is not known if any properties may be involved in the property acquisition process, we have included the scope to complete the necessary property acquisition and rights support for both railroad properties and one private property including the preparation of needed plat and legal documents. If the City determines that portions of this scope are needed, we can refine this to meet the City’s needs.
Task 7.2 Potholing
Schaaf & Wheeler's subconsultant, Level A, will provide potholing services at the request of the City. For this scope, we have assumed three total potholes, up to 10 feet in depth. This task will require City authorization. Schaaf & Wheeler recommends completing any potholing by completion of the 65% design submittal to ensure any found utility conflicts can be addressed through the contract documents.
Task 7.3 Field Testing Allowance for Downstream Force Main A field-testing allowance is provided for as needed testing of the downstream force main. Testing may include camera inspection, smart ball assessment, non-destructive material testing, or other pertinent methods up to the allowance amount identified. Due to unknown conditions for access, isolation, and other constraints, exact recommendations are not known at this time. Following the desktop study and condition assessment study for the downstream force main in Task 2.3, Schaaf & Wheeler will provide recommendations for this task.
8. Project Approach
Understanding the City’s goals for the Bryte Sewer Pump Station is key to project success. After review of the RFP and conversations with the City’s team at the preproposal meeting, we feel that we have a good understanding of the City’s goals, but we look forward to confirming them through further coordination 14 54
Project Approach Proposal
June 25, 2026
with the City. Key components that should be confirmed prior to proceeding with the work are described in the following sections.
8.1 Pump Station Hydraulics,
Components, and Reliability
Schaaf & Wheeler brings extensive experience
evaluating complex pump station hydraulics including
numerous shared force main calibration studies.
Through hundreds of pump station assessments, our
team has developed a strong understanding of
applicable code requirements and hydraulic
constraints that are often overlooked in pump station
evaluations. We will apply this knowledge to help
ensure the selected pumps best align with the City’s
goals and operational needs. In addition, our project
manager, Glen M. Anderson, PE, is a certified Pump
Systems Assessment Professional (PSAP), further
strengthening our team’s technical qualifications.
For the Bryte Sewer Pump Station, we have
developed a system curve that represents the
variation in duty conditions due to the differing flows within a shared force main. Figure 1 shows a
schematic configuration of the existing configuration,
including flows in the force main based on firm capacities outlined in the City’s Sewer Master Plan. The figure to the right shows the Bryte Sewer Pump station force main system curves and transposed pump curves, which are based on a preliminary calibration of the force main from the as-built drawings provided. We have developed two system curves—one for no downstream pump stations running (dashed) and one for all pump stations running (solid)—representing the anticipated low-head and highhead conditions that the Bryte SSPS may experience. This allows us to confirm that any selected pumps can operate through all City pump station operating scenarios.
Figure 2. Largest Practical Pump Configuration
The RFP and the Sewer Master Plan identify a need for a rated duty point of 9,000 gpm for future peak flows, upgraded from the existing firm capacity of 3,400 gpm. To accommodate this flow rate with the existing force main, it would require approximately 1450 pumping horsepower, resulting in velocity exceeding 14 feet per second and pressures exceeding 225 psi in the force main, as shown in Figure 2.
Figure 1. Existing Bryte Sewer Pump Station Schematic
15 55
Project Approach Proposal
June 25, 2026
Figure 4. Optimized Pumps with a Modeled 20-inch Diameter Force Main Schaaf & Wheeler investigated the pumps outlined in Table 1 below as options to increase the capacity of the Bryte Sewer Pump Station while also considering the operating costs and benefits of including a wider range of operating conditions.
Table 1. Comparison of Pump Alternatives
Pump Rated HP Bryte Pump Station Capacity (GPM)
Existing Force Main Modeled 20" Force Main
N 3231/775 ~ 480 335 1 Pump: 4,500 - 5,100 GPM 1 Pump: 5,500 - 6,200 GPM 2 Pumps: 5,200 - 6,200 GPM 2 Pump: N/A
N 3312/775 3 ~ 670 280 1 Pump: 3,800 - 4,650 GPM 1 Pump: 5,100 - 6,400 GPM 2 Pumps: 4,100 - 5,200 GPM 2 Pumps: 6,000 - 7,400 GPM
N 3301 MT 3 ~ 636 140 1 Pump: 2,000 - 3,000 GPM 1 Pump: 2,600 - 3,900 GPM 2 Pumps: 2,400 - 3,500 GPM 2 Pumps: 3,200 - 4,900 GPM
We evaluated the use of the largest practical rail-mounted Flygt pump (N 3231; ~335 HP) to increase the station’s firm capacity within the existing system’s constraints. As shown in Figure 2 and demonstrated in Table 1, the use of a second pump in parallel increases the total station flow by 10%–20%. A 75% increase in pumping horsepower is needed.
As an alternative to
installing the pumps
identified in Figure 2,
Schaaf & Wheeler
evaluated the use of
pumps that are more
tailored to near-term
operations. The use of
smaller pumps can
increase existing
capacity without such
a drastic increase in
horsepower, as shown
in Figure 3. The use of
an N 3312 ~280 HP
pump will increase the
near-term capacity,
compared to the existing firm capacity, by 10%-35% with a single pump running and 20%-50% with two pumps running in parallel. Peak velocities in this scenario still exceed 12 feet per second, but that is limited to times when the large pumps are running. The existing force main size limits the ability increase the capacity. Based on
previous experience with
stations that experience
high peak flows
seasonally, Schaaf &
Wheeler recommends
considering the
installation of low flow
pumps. As an example,
N 3301 ~140 HP is
plotted demonstrating
that most standard flows
can be used for these
pumps operating at a
significantly lower HP,
reducing overall
electrical costs.
Figure 3. Optimized Pumps for Near-Term Conditions
16 56
Project Approach Proposal
June 25, 2026
As demonstrated in Figures 2 and 3 above, the existing force main size provides diminishing returns as flows increase. To demonstrate the benefit of increasing the size of the Bryte force main, we modeled a 20-inch force main replacement shown to the right in Figure 4. The same pumps are plotted to demonstrate the increase in flow and subsequent decrease in velocities the force main. Use of the same pumps mentioned above would convey between 30% and 45% more flow depending on the pumps and flow conditions. This demonstrates that the N 3231 and N3312 also have the ability to operate through many hydraulic conditions that allow alternatives for the City to expand capacities to meet future demands.
While we primarily focus on the hydraulic benefits of the different pump configurations, there are additional benefits, including cost savings during construction (as discussed below) and for long term operations and maintenance. Energy costs are significantly lower if low-flow pumps are installed to maintain station capacity most of the year. Smaller pumps also have less expensive replacement parts and small associated valving and piping, which all decrease long-term maintenance costs. Schaaf & Wheeler looks forward to discussing pump configuration and force main strategy with the City.
8.2 Evaluating VFD Replacement
Schaaf & Wheeler brings an in-depth
understanding of how VFDs function in
pumping systems and will evaluate their
use in the proposed pump station
rehabilitation to ensure that, if used, they
provide maximum benefit to operations.
Systems with high lift and short or larger
diameter force mains, for example, often
lack compatibility with VFDs due to
limitations in how much the VFD can be
turned down. Alternatively, systems with
low lift and high dynamic head generally
see the most benefit from VFD use.
Other considerations, such as harmonics,
component reliability, and physical
constraints are key factors in VFD
selection that Schaaf & Wheeler explores in any pumping assessment. For the Bryte Sewer Pump Station, we anticipate significant friction loss as flows increase. When downstream stations are pumping to the shared force main,
their added friction loss
appears as increased static
head in the Bryte sanitary
sewer system curve. As
such, a detailed VFD
analysis will be needed to
identify any operational
constraints and scenarios
that may limit maximum
turndown.
8.3 Phasing/Sequencing
& Constructability
Having worked on hundreds
of pump station projects,
large and small, Schaaf &
Wheeler has a keen
understanding of current
industry lead times and how
contractors will sequence and perform the work required. Schaaf & Wheeler considers constructability in 17 57
Project Approach Proposal
June 25, 2026
making design decisions to mitigate potential conflicts or confusion during the construction process and to reduce or eliminate the need for bypass pumping. Phasing and sequencing improvements are often considered to streamline the construction process, keeping projects on schedule and minimizing makeready and temporary costs that provide no long-term benefit to the City. Sample sequencing details from our work on San Mateo’s Dale Avenue Sewer Pump Station (shown above) demonstrate the creative thinking that Schaaf & Wheeler can bring to this project. Considerations for time of year (dry season versus wet season) along with the more complicated electrical improvement sequencing led to a project that used zero bypass pumping for a 60 MGD station. We aim to bring the same project-specific analysis to the Bryte Sewer Pump Station Rehabilitation Project.
Schaaf & Wheeler has explored preliminary means to bypass the Bryte pump station based on our review of the record drawings. Upon initial review, we believe that it is possible to construct the station without bypassing by installing the new station in an alternate location as shown in Figure 5, below.
Schaaf & Wheeler laid out a potential site plan that includes two precast concrete wet wells and valve vaults that contain high flow and low flow pumps. There is space to install the new high flow pump station before demolishing the existing pump station. The existing station can operate up until the new high flow station is commissioned.
Figure 5. Phase 1 of Construction
Following startup of the high flow pump station, the existing station can be demolished and abandoned in place as necessary to make space to finish construction of the low flow pump station. Following demolition of the existing building and appurtenance, the Contractor can construct the CMU building and the standby diesel engine generator as shown in Figure 6, below. There are a number of appurtenances to make operations and maintenance simpler, including additional isolation, updating to a single wet well, and managing hydraulic connectivity. In addition, the design will include resurfacing, re-fencing, and upgrading amenities requested by the City. Schaaf & Wheeler has identified preliminary station configurations that will remain within the existing bounds and should eliminate need for property acquisition.
The station configurations shown within this proposal represent a cost-effective and fast approach to installing new wet wells. Should the City prefer an alternative wet well configuration, we can gladly accommodate it and will bring the same creativity to its implementation. Schaaf & Wheeler looks forward to discussing potential site configuration alternatives and amenities with the City. 18 58
Project Approach Proposal
June 25, 2026
Figure 6. Phase 2 of Construction
8.4 Implementation
With experience from several similar projects, Schaaf & Wheeler has developed and will employ several tested tools as part of project management efforts. These procedures and tools will allow us to provide the City with the most effective project management throughout the project in order to deliver the design on time and on budget.
Staffing Allocations: Schaaf & Wheeler holds weekly internal workload meetings to forecast staffing needs and prioritize critical path projects. Workloads are projected six months ahead to proactively manage schedules and avoid deadline conflicts.
Consistent Communication: Monthly conference calls will provide regular updates to City staff on progress, needed input, and key decisions. These meetings allow issues to be identified and resolved quickly, limiting impacts to schedule and budget.
In Person Meetings: While much communication and coordination can occur through digital means, there is a significant benefit of face-to-face meetings. We include an in person kickoff meeting and in person design review meetings in our project management scope to encourage a collaborative environment to achieve the end result desired by the City. Detailed Billing Reports: Monthly billing summaries will accompany invoices and identify work performed, percent complete, remaining budget, and a brief progress summary. This allows the City to compare work completed against
budget spent and make adjustments
if needed.
Principal-In-Charge (PIC): If
concerns arise regarding staff or
subconsultant performance, the PIC
can be brought in immediately to
resolve issues and keep the project
on track. Benjamin Shick, PE, will
serve as PIC for this project.
QA/QC Procedure: For quality
assurance and quality control, we
have developed a detailed process
that includes independent review of
19 59
Proposal
June 25, 2026
the deliverable by an uninvolved engineer with significant experience in the field. The flow chart above details the QA/QC process that Schaaf & Wheeler implements for all client deliverables. Larry Johnson, PE, is the QA/QC lead for this project, and he has completed many projects similar in scope and size to the City’s proposed rehabilitation. He will apply his 14+ years of experience to his reviews.
9. Required Statements & Business License
9.1 History
Schaaf & Wheeler has not had any mergers, acquisitions, or sales related to its organizational structure within the last three (3) years.
9.2 Legal Challenges
There are no pending litigations against Schaaf & Wheeler.
9.3 Fiscal Viability
In the last ten (10) years, Schaaf & Wheeler has not filed or had any proceedings filed against it of any bankruptcy or insolvency proceedings, whether voluntary or involuntary, or undergone the appointment of a receiver, trustee, or assignee for the benefit of creditors.
9.4 Business License
Our California State Business License is attached below. 20 60
Schaaf & Wheeler, Consulting Civil Engineers
CPE26-275 – Bryte Sewer Pump Station Rehabilitation
Expires on 8/19/2029
EXHIBIT B
Schedule of Performance
Contract Start Date 8/19/2026
Contract End Date 8/19/2029
61 Schaaf & Wheeler, Consulting Civil Engineers
CPE26-275 – Bryte Sewer Pump Station Rehabilitation
Expires on 8/19/2029
EXHIBIT C
Schedule of Fees
62 $315 $265 $215 $185
Task 1 Project Management 40 56 24 0 $32,600 $0 $0 $0 $0 $0 $0 $0 $0 $0 $32,600 8 24 $8,880 $8,880
24 24 16 $17,360 $17,360
8 8 8 $6,360 $6,360
Task 2 Preliminary Design Memorandum and Field Investigations 52 96 100 20 $67,020 $37,000 $10,000 $30,000 $47,000 $0 $0 $20,000 $0 $0 $211,020 2 8 8 $4,470 $30,000 $34,470
2 8 4 $3,610 $47,000 $50,610
24 40 48 $28,480 $17,000 $8,000 $20,000 $73,480
24 40 40 20 $30,460 $20,000 $2,000 $52,460
Task 3 Contract Documents 72 108 248 240 $149,020 $149,000 $70,000 $0 $1,700 $0 $0 $0 $0 $0 $369,720 32 40 96 100 $59,820 $59,000 $118,820
16 32 80 80 $45,520 $45,000 $55,000 $1,700 $147,220
16 24 48 40 $29,120 $30,000 $10,000 $69,120
8 12 24 20 $14,560 $15,000 $5,000 $34,560
Task 4 Bid Support Services 8 12 16 8 $10,620 $12,200 $1,000 $0 $0 $0 $0 $0 $0 $0 $23,820 8 12 16 8 $10,620 $12,200 $1,000 $23,820
Task 5 Engineering Support During Construction 42 84 88 44 $62,550 $72,000 $14,000 $0 $0 $0 $0 $0 $0 $0 $148,550 40 80 80 40 $58,400 $68,000 $13,000 $139,400
2 4 8 4 $4,150 $4,000 $1,000 $9,150
Task 6 Environmental Clearance 4 8 4 0 $4,240 $0 $0 $0 $0 $20,000 $0 $0 $0 $0 $24,240 4 8 4 $4,240 $20,000 $24,240
Total 218 364 480 312 $326,050 $270,200 $95,000 $30,000 $48,700 $20,000 $0 $20,000 $0 $0 $809,950 Task 7 Optional Tasks 6 20 20 0 $11,490 $0 $0 $12,000 $0 $0 $30,000 $0 $88,100 $50,000 $191,590 4 12 4 $5,300 $12,000 $88,100 $105,400
2 8 16 $6,190 $30,000 $36,190
$50,000 $50,000
Structural Engineer - BCASurveying - Kier & WrightGeotechnical - CornerstoneEnvironmental Clearance - OnterrisUtility Potholing - Level A CCTV - Presidio Systems Inc.Property Acquisition Support - AR/WS Environmental Clearance
Appraisals, Appraisal Reviews, and Property Rights Support Field Testing for Downstream Force main (Allowance)
Potholing
Preliminary Design Report
65% Contract Documents
Condition Assessment
95% Contract Documents
Constructability Review and Update
Bid Support Services
Engineering Support During Construction
Prepare Record Drawings
Final Contract Documents
Fee Schedule - Update
Complete Topographic Surveying and Utility Investigations Geotechnical Investigation
July 27, 2026
Public Meetings
Hourly Rates
Total
Project Management, Coordination, and Progress Schedules and Reports Attend Meetings and Prepare Meeting Agendas and Minutes Schaaf & Wheeler TotalElectrical Engineer - TJCAAMisc.
Principal Project ManagerSenior EngineerAssistant EngineerDesigner (CADD) City of West Sacramento Bryte Sewer Pump
Station Rehabilitation 25-110-RFP
63 Schaaf & Wheeler, Consulting Civil Engineers
CPE26-275 – Bryte Sewer Pump Station Rehabilitation
Expires on 8/19/2029
EXHIBIT D
CERTIFICATE OF COMPLIANCE WITH LABOR CODE § 3700
[Labor Code § 1861]
I am aware of the provisions of Section 3700 of the Labor Code which require every employer to be insured against liability for workers’ compensation or to undertake self-insurance in accordance with the provisions of that code, and I will comply with such provisions before commencing the performance of the work of this contract.
CONSULTANTS
By:
Glen M. Anderson, Vice President
64 Schaaf & Wheeler, Consulting Civil Engineers
CPE26-275 – Bryte Sewer Pump Station Rehabilitation
Expires on 8/19/2029
EXHIBIT D
LABOR COMPLIANCE
1. PREVAILING WAGE
A. The Work contemplated herein constitutes a public work within the meaning of Labor Code sections 1720 and 1771. It shall be mandatory upon the Consultant and upon any Subcontractor, to pay not less than the said specified prevailing rates of wages to all workers employed by them under the Contract in accordance with Labor Code section 1774. The Director of the Department of Industrial Relations ("DIR") of the State of California has determined the general prevailing rate of wages of per diem wages in the locality in which the work is to be performed for each craft or type of worker needed to execute the Contract. The Consultant acknowledges that it has examined the prevailing rate of per diem wages as established by the DIR. Copies of the current schedules for prevailing wages are on file at City Hall, and the contents of those schedules are incorporated herein as if set forth in full. The Consultant shall post a copy of the applicable prevailing wage determinations at each job site, along with any other work place posters required by law.
B. The City will not recognize any claims for additional compensation because of the payment of prevailing wages. The possibility of wage increases is one of the elements to be considered by the Consultant in determining its proposal, and will not under any circumstances be considered as the basis of a claim against the City.
C. By executing this Contract Consultant warrants that it has registered with the Department of Industrial Relations in accordance with Labor Code section 1725.5.
2. PREVAILING WAGE RECORDS
A. The Consultant and each subcontractor shall keep an accurate payroll record which shows the name, address, social security number, correct work classification (in accordance with the wage decision), both straight and overtime worked each day and week, and hourly rate of pay, gross wages earned, deductions made and net wages paid to each journeyman, apprentice, worker or other employee paid by the Consultant /subcontractor in connection with the Work. These payroll records shall be certified and shall be made available at Consultant's principal office. These records shall be maintained during the course of the Work.
The Consultant and all subcontractors shall make the certified payroll records available for inspection by City representatives upon request and shall permit such representatives to interview employees during the work hours on the job site.
B. The City shall notify the Consultant in writing of any discrepancies or violations that are discovered during such inspections. Written notification pursuant to this Section shall include the actions that will be necessary to resolve the discrepancies and/or violations. The Consultant shall be held entirely responsible for the prompt resolution of all non-compliances with the prevailing wage laws, including those pertaining to all subcontractors and any lower-tier subcontractors. The Consultant shall forfeit as penalty to the City the amount specified by law for each calendar day or portion thereof for each worker (whether employed by the Consultant or any subcontractor) paid less than the stipulated prevailing rates for any work done under the Contract in violation of the provisions of the Labor Code and in particular, Section 1775. 65 Schaaf & Wheeler, Consulting Civil Engineers
CPE26-275 – Bryte Sewer Pump Station Rehabilitation
Expires on 8/19/2029
C. To the extent applicable, Consultant and subcontractors shall maintain and furnish to the Department of Industrial Relations ("DIR"), a certified copy of each weekly payroll (but no less often than monthly), with a statement of compliance signed under penalty of perjury. Such certified payroll reports shall be transmitted electronically to the DIR.
D. The City will not recognize any claims for additional compensation because of the payment of the prevailing wages. The possibility of wage increases is one of the elements to be considered by the Consultant in entering into the Contract, and will not under any circumstances, other than delays caused by the City, or the City’s agents, be considered as the basis of a claim against the City.
3. Labor Discrimination
Attention is directed to Section 1735 of the Labor Code, which reads as follows:
“No discrimination shall be made in the employment of persons upon public works because of their race, color, national origin or ancestry, physical handicap, mental condition, marital status, or sex of such person, except as provided in Section 12940 of the Government Code, and every General Contractor for public works violating this section is subject to all the penalties imposed for a violation of this chapter.”
4 Eight-Hour Day Limitation
(a) In accordance with the provisions of the Labor Code, and in particular, Sections 1810 to 1815 thereof, inclusive, incorporated herein by reference, eight hours labor shall constitute a day's work, and no worker in the employ of Consultant, or any Subcontractor, doing or contracting to do any part of the work contemplated by the Contract, shall be required or permitted to work more than eight (8) hours in any one calendar day and forty (40) hours in any one calendar week in violation of those provisions; provided that subject to Labor Code Section 1815, a worker may perform work in excess of either eight (8) hours per day or forty (40) hours during any one week upon compensation for all hours worked in excess of eight (8) hours per day or forty (40) hours during any one week at not less than one and one-half times the basic rate of pay.
(b) The Consultant and each Subcontractor shall also keep an accurate record showing the names and actual hours worked of all workers employed by them in connection with the Contract. This record shall be open at all reasonable hours to the inspection of the City. It is hereby further agreed that, except as provided in (a) above, the Consultant shall forfeit as a penalty to the City the sum of twenty-five dollars ($25) for each worker employed in the performance of the Contract by the Consultant or by any of its Subcontractors for each calendar day during which such worker is required or permitted to labor more than eight (8) hours in and one calendar day and forty (40) hours in any one calendar week in violation of Sections 1810 through 1815.
5. Compliance with State Requirements for Employment of Apprentices (a) The Consultant's attention is directed to Section 1777.5 of the Labor Code.
Provisions of said Section pertaining to employment of registered apprentices are hereby incorporated by reference into this Contract. As applicable, the Consultant or any Subcontractor 66 Schaaf & Wheeler, Consulting Civil Engineers
CPE26-275 – Bryte Sewer Pump Station Rehabilitation
Expires on 8/19/2029
employed by the Consultant in the performance of this Contract shall take such actions as necessary to comply with the provisions of Section 1777.5. 67 CITY COUNCIL AGENDA REPORT
MEETING DATE: August 19, 2026 ITEM # 6
SUBJECT:
CONSIDERATION OF APPROVAL OF A PROFESSIONAL SERVICES CONTRACT WITH
WSP FOR TECHNICAL TRANSIT PLANNING SERVICES AND PREPARATION OF THE WEST SAC FORWARD TRANSIT PRIORITY PLAN (CIP 12022)
INITIATED OR REQUESTED BY: REPORT COORDINATED OR PREPARED BY:
[ ] Council [X] Staff
[ ] Other
Jason McCoy, AICP, Transportation and Mobility
Division Manager
Community Development Department
ATTACHMENT [X] Yes [ ] No [ ] Information [ ] Direction [X] Action
OBJECTIVE
The objective of this report is to provide the City Council with sufficient information to award a professional services contract with WSP USA (WSP) for technical transit planning services and preparation of the West Sac Forward Transit Priority Plan (CIP 12022).
RECOMMENDED ACTION
Staff respectfully recommend that the City Council:
1) Authorize the City Manager, or his designee, to execute a professional services agreement with WSP for technical transit planning services (CIP 12022), in an amount not to exceed $847,578; 2) Authorize the City Manager, or his designee, to make contract amendments up to $85,000 of the total contract value; and
3) Authorize the City Manager, or his designee, to execute non-substantive changes or administrative modifications to the services contract, with approval from the City Attorney.
BACKGROUND
West Sacramento is directly adjacent to Downtown Sacramento and within the Sacramento region urban core, but access to and within the city can be challenging due to geographic and transportation barriers. The Sacramento River separates West Sacramento from Sacramento at our north and east boundary with local transit service crossings limited to the historic Tower Bridge and US 50/Interstate 80 Business Loop. Internal to West Sacramento, the Union Pacific and Sierra Northern Railroad corridors, freeways, and the Deep-Water Ship Channel connecting the Port of West Sacramento with the San Francisco Bay bisect the City creating barriers to connectivity. Only three arterial street corridors provide access between the northern half of West Sacramento and Southport. The pedestrian and transit network has low permeability as a result, making it difficult for residents to access and get around by transit, and long travel times to downtown during peak hours make transit compete poorly with driving.
Fixed route and intercity bus transit (Yolobus) and paratransit services are provided by Yolo County Transportation District (YoloTD). Fixed-route transit ridership has declined significantly in the last several years, peaking in 2018 at over 100,000 trips annually. In response to declining fixed-route transit ridership, the City collaborated with YoloTD to streamline fixed-route Yolobus service and developed a "Downtown Shuttle" by directing transit lines to the West Sacramento Transit Hub before continuing into the downtown Sacramento center. The Downtown Shuttle service feature became popular with transit riders and service to Downtown Sacramento from the West Sacramento Transit Center is now integrated into all local Yolobus routes.
Two Yolobus routes in Southport were consolidated into one - Route 37 operates on weekdays only and serves as a "super commuter" route to Downtown Sacramento for the AM and PM peak commute times. No other Yolobus routes currently serve the Southport area and no intracity route linking the north and south parts of the City exists, requiring riders to disembark and transfer at the West Sacramento Transit Center to continue their trips between the north and south parts of the City. Despite efforts to streamline services, only 41% of Yolobus ridership has returned post-pandemic - with similar transit agencies seeing 60-76% of riders return. Average cost per passenger trip has also increased over 20% in that time.
While transit is a viable option for many, most residents don't live within walking distance of a transit stop. Beyond the disconnect within the existing transit system between socioeconomically disadvantaged neighborhoods in the north half of the City from more affluent amenity rich areas of Southport, low-density transit catchment areas across pockets of the city result in low ridership and higher costs per rider. Additionally, transit stations currently lack alternative mobility options to travel the first and last mile to and from destinations. 68 Consideration of Contract Award – WSP – West Sac Forward Transit Priority Plan August 19, 2026
To overcome transit deficiencies, the City developed a framework for a publicly funded on-demand flat-rate citywide transit service (West Sacramento On-Demand) using branded 7-passenger hybrid vans and contracts with private rideshare operator Via doing business as Nomad Transit, LLC., to manage the ride hailing platform and algorithm for the service, as well as the fleet of vans and drivers for the on-demand service. In October 2024, the City launched the West Sacramento - Downtown Sacramento On-Demand Rideshare Pilot. As part of the Rideshare Pilot, Yolo-Solano Air Quality Management District awarded the City $13,700 in Clean Air Funds to cover the fares for rides that start or end in the Pilot's zones. Staff estimated that this funding would cover an estimated 3,900 rides, or an estimated 2% increase in annual ridership on the Rideshare platform. The demand and popularity of the Pilot zones exceeded those projections, and Clean Air Funds were fully expended within 3 months. This Pilot demonstrated that strong transit demand exists between Downtown Sacramento and West Sacramento, particularly service to the Sacramento Regional Transit District (SacRT) operated Light Rail Transit (LRT) and confirms robust estimated ridership projections for the planned LRT service into West Sacramento referred to locally as the Downtown Riverfront Streetcar (Streetcar).
The Streetcar project is a long-planned regional transit project led initially by SACOG on behalf of West Sacramento and Sacramento, then taken over by the Sacramento Regional Transit District to extend light-rail service across the Sacramento River via the Tower Bridge, connecting West Sacramento with downtown Sacramento and Sacramento Valley Station. A rail connection between the two cities has been considered in various forms for several decades, while development of the current project began more directly in the early 2010s. The project has received substantial regional support, including funding through West Sacramento’s voter-approved Measure V transportation sales tax, designation as a regional funding priority by the Sacramento Area Council of Governments, and congressional advocacy led by Congressmember Doris Matsui. The project’s proposed financial plan has included a combination of federal, state, regional, and local funds; however, the anticipated Federal Transit Administration Capital Investment Grant has remained subject to completion of the federal approval process and execution of a construction grant agreement.
The project is intended to improve regional mobility and transit access, connect major employment, entertainment, and intercity transportation destinations, support infill development, and provide environmental benefits through zero-emission rail service. Based on SacRT’s current public schedule, construction had been expected to begin in early 2027, with completion anticipated in 2030, provided that final approvals, funding agreements, and construction bids remained consistent with project assumptions.
The project nevertheless faced significant financial and schedule risks over the years. Recently, tariffs and volatility in steel and other construction-material prices, continued labor-cost escalation, higher fuel and freight costs, rising inflation, and broader geopolitical and supply-chain disruptions have placed upward pressure on major infrastructure projects nationwide. As a result of these external factors, there is a high likelihood that construction contractor bids will significantly exceed funds sourced for the project.
In addition, uncertainty regarding the timing and execution of federal Capital Investment Grant agreements nationwide, including the current administration withholding funds from public transit projects, have elevated the risk for all transit projects that have not yet received final federal construction commitments; including the Streetcar project which is under a Federal Transit Administration deadline to obligate federal funds by September 2027.
Both SacRT and YoloTD are updating their respective Short Range Transit Plans (SRTP). For YoloTD, the last plan was developed in 2014 and much has changed since then in travel habits, funding, and technology, including the emergence of app-based rideshare services. The SRTP outlines how each transit agency’s public transportation system will operate and serve local communities. West Sacramento is currently served by YoloTD and are within the YoloTD service boundary with a long-term agreement in place to provide public transit.
Additionally, the City is located within the SacRT jurisdictional boundary and city staff are currently working with SacRT to obtain a full understanding of potential impacts around the Streetcar project including not only capital costs, but potential increases in the cost of operations and maintenance of potential LRT service within the city.
At this time, additional work and new expenses on the Streetcar project are suspended until City staff have fully assessed the implications of these anticipated cost impacts on the viability of the project.
ANALYSIS
The West Sac Forward Transit Priority Plan is not intended to simply produce a general list of desirable transit services and projects. It is intended to help the City determine what transit services West Sacramento should 69 Consideration of Contract Award – WSP – West Sac Forward Transit Priority Plan August 19, 2026
provide, what investments should be pursued, who should provide and fund those services, and what the City can realistically implement over the next 10 to 20 years.
The plan will evaluate existing and emerging West Sacramento transit modes with respect to our growing population and declining transit ridership trends. Plan partners including YoloTD, SacRT, and Via, with support from SACOG will develop and refine community-vetted local policies, strategies, and recommended transit and road infrastructure improvements to help reduce transit delays, improve the reliability of public transportation, increase transit ridership, improve access and mobility for equity priority communities and transit-dependent populations, reduce Greenhouse Gas (GHG) emissions, reduce congestion and Vehicle Miles Traveled (VMT), and improve traffic safety while balancing service cost, infrastructure cost, and performance.
This proposed plan, its policies and resulting improvements will be rooted in community feedback and collaborative public participation to improve efficiency, effectiveness, and seamless integration of public bus, rail, rideshare and potential bus and light rail transit solutions. In addition, this plan intends to thoroughly explore the costs associated with providing a multimodal transit system, including identifying near-and long-term projected capital, operations, and maintenance costs – as well as potential funding sources for transit system components.
On July 1, 2025, City staff received a letter conditionally awarding the City an amount of $431,490 with a match requirement of 50% the total projected cost or $431,490. The City Council allocated $600,000 for Transit Priority, Light Rail Transit (LRT) and Bus Rapid Transit (BRT) plan development in the Capital Improvement Program (CIP 12022) in fiscal year 2022/2023, providing the required match amount and an additional allocation of $168,510 remaining for contingency and staff time.
On September 17, 2025, the City Council adopted Resolution 25-92 authorizing the city to enter into a restricted grant agreement with the California Department of Transportation (Caltrans) to receive SB-1 Grant Funds to prepare the West Sac Forward Transit Priority Plan in accordance with the Caltrans and SACOG approved Scope of Work developed by city staff in cooperation with the Sacramento Area Council of Governments (SACOG), YoloTD, SacRT, and Via. That agreement was promptly executed to initiate consultant procurement.
On April 24, 2026, Request for Proposals for West Sac Forward Transit Priority Plan (26-043-RFP) was released with a response deadline of June 2, 2026. Four responsive proposals were received and reviewed by a proposal committee consisting of one transportation professional from each partner agency/firm including YoloTD, SacRT, and Via; and two staff members from the West Sacramento Transportation and Mobility Division. Cost proposals were requested to be submitted separately from technical proposals and remained sealed through the initial proposal review and scoring process. After initial proposal scores were inputted separately by each of the panel members into the OpenGov procurement platform, the three highest ranking firms were then notified that they had been shortlisted for an interview based on firm qualifications, technical approach, staff experience, and quality of the proposal responses.
One-hour interviews were conducted on June 23, 2026, for each shortlisted firm. Panelists were provided a handbook with a structured framework for evaluating each consultant team consistent with the evaluation criteria outlined in the RFP and each team were asked a series of questions to assess their ability to test assumptions, address fiscal and governance realities, evaluate tradeoffs, and produce a practical, politically realistic implementation strategy for public transit services in West Sacramento.
Interview scores were inputted separately by each of the panel members in addition to the prior scores received by each proposing firm. Of the three shortlisted firms invited to interview, WSP ranked highest among each of the panel members. WSP was then notified of the intent to award on June 24, 2026. Additionally, all firms not selected for award were phoned and emailed to inform them of the results and express appreciation for their submittals and interviews. Each was provided with debrief consultation invitations including evaluation and interview summary of notes taken by each panel member. The professional services contract (Attachment 1) including scope of work, schedule and cost proposal have been included with this report for approval.
It is anticipated that work will begin with contract approval and execution. This is a partially grant-funded project awarded by Caltrans under their Sustainable Transportation Grant program, and all work must be concluded by the consultant team, and all final invoices must be received and approved by the City before June 30, 2028.
Environmental Considerations
This action is not a "project" for the purposes of the California Environmental Quality Act, Public Resources Code section 21000 et seq. ("CEQA"), because it is not an activity that may cause either direct or reasonably 70 Consideration of Contract Award – WSP – West Sac Forward Transit Priority Plan August 19, 2026
foreseeable indirect physical change in the environment and, therefore, pursuant to Public Resources Code section 21065 and CEQA Guidelines sections 15060(c) and 15378(a), it is not subject to environmental review.
Commission Recommendation
Consultant procurement is an administrative item and does not have new policy implications that would require Transportation, Mobility, and Infrastructure Commission input. As such, this item was not presented in advance of City Council consideration. Staff will seek Commission feedback and direction over the course of the project, including policies and capital improvements recommended within the draft plan as it is developed.
Strategic Plan Integration
This project advances the Strategic Plan Principle: “Mobility & Connectivity,” in support of providing convenient and sustainable choices for people to get where they are going, “Inclusive & Diverse,” in support of equitable investment and social/environmental justice in the city, and “Core Services & Infrastructure,” in support of sustaining a financially sound city in which everyone feels safe and secure, with quality services and wellmaintained infrastructure. The project is also consistent with exploring “Future of City Transit” 2026 Strategic Priority.
Alternatives
Staff respectfully recommend that the City Council take the recommended action. Alternatively, Council may elect to postpone or not hear this item. Staff do not recommend this action as Caltrans has set a firm deadline of June 30, 2028, to complete the West Sac Forward Transit Priority Plan. Further delay may jeopardize the ability of the selected consultant to complete the plan within the specified timeframe.
Coordination and Review
This report was prepared by the Transportation & Mobility Division of the Community Development Department.
Coordination with Finance in FY22/23 with approval from City Council for CIP 12022 and subsequent Council approval of Resolution 25-92 secured the local and Caltrans Sustainable Transportation Grant funding required to advance this project. Scope of Work and application narrative was shared in advance of submittal to Caltrans with SACOG, YoloTD, and SacRT for feedback, comment, and modifications. Letters of Support were provided by each of these agencies in addition to Via Transportation, Inc. Further coordination with these agencies, as well as internal to the City of West Sacramento will continue throughout plan development.
Budget/Cost Impact
Appropriated local funds for the project are $600,000 (CIP 12022). Funding from the Caltrans Sustainable Communities Grant ($431,490) requires 50% local matching funds ($431,490), with a remaining allocation of $168,510 for contingency and staff time. WSP’s cost proposal total of $847,578 is within the existing appropriation limit and no additional appropriation is required.
ATTACHMENT
1. CDD26-284 Contract WSP USA, INC.
71 WSP USA
Contract Number – West Sac Forward Transit Priority Plan Expires on June 30, 2028
1 11.4.2024
CONTRACT FOR SERVICES
THIS CONTRACT is made on ____August 19, 2026___, by and between the CITY OF WEST SACRAMENTO (“City”), and _________WSP USA____________(“Consultant”).
WITNESSETH:
WHEREAS, the City proposes to enter into a professional services contract with Consultant to prepare the West Sac Forward Transit Priority Plan; and WHEREAS, the Consultant has presented a proposal for such services to the City, dated June 2, 2026 (attached hereto as Exhibit “A”) and is duly licensed, qualified and experienced to perform those services; and
NOW, THEREFORE, the parties hereto mutually agree as follows:
1. SCOPE OF SERVICES:
A. Consultant shall do all work, attend all meetings, produce all reports and carry out all activities necessary to completion of the services described in Exhibit “A”. This Contract and its exhibits shall be known as the “Contract Documents.” Terms set forth in any Contract Document shall be deemed to be incorporated in all Contract Documents as if set forth in full therein. In the event of conflict between terms contained in these Contract Documents, the more specific term shall control. If any portion of the Contract Documents shall be in conflict with any other portion, provisions contained in the Contract shall govern over conflicting provisions contained in the exhibits to the Contract.
B. Consultant enters into this Contract as an independent contractor and not as an employee of the City. The Consultant shall have no power or authority by this Contract to bind the City in any respect. Nothing in this Contract shall be construed to be inconsistent with this relationship or status. All employees, agents, contractors or subcontractors hired or retained by the Consultant are employees, agents, contractors or subcontractors of the Consultant and not of the City. The City shall not be obligated in any way to pay any wage claims or other claims made against Consultant by any such employees, agents, contractors or subcontractors, or any other person resulting from performance of this Contract. In the event that Consultant or any employee, agent, or subcontractor of Consultant providing services under this Agreement claims or is determined by a court of competent jurisdiction or the California Public Employees Retirement System (PERS) to be eligible for enrollment in PERS as an employee of the City, Consultant shall indemnify, defend, and hold harmless City for the payment of any employee and/or employer contributions for PERS benefits on behalf of Consultant or its employees, agents, or subcontractors, as well as for the payment of any penalties and interest on such contributions, which would otherwise be the responsibility of City. Notwithstanding any other agency, state or federal policy, rule, regulation, law or ordinance to the contrary, To the greatest extent permitted by law, Consultant and its employees, agents, and subcontractors shall not qualify for or become entitled to, and hereby agree to waive any claims to, any compensation, benefit, or any incident of employment by City, including but not limited to eligibility to enroll in PERS as an employee of City and entitlement to any contribution to be paid by City for employer contribution and/or employee contributions for PERS benefits.
72 WSP USA
Contract Number – West Sac Forward Transit Priority Plan Expires on June 30, 2028
2 11.4.2024
C. The Consultant agrees it has satisfied itself by its own investigation and research regarding the conditions affecting the work to be done and labor and materials needed, and that its decision to execute this Contract is based on such independent investigation and research.
2. TERM OF CONTRACT
A. The services of Consultant are to commence upon execution of this Contract by the City, and shall be undertaken and completed in accordance with the Schedule of Performance attached hereto and incorporated herein by this reference as Exhibit “B” and terminate on June 30, 2028.
B. Consultant’s failure to complete work in accordance with the Schedule of Performance may result in delayed compensation as described in Section 3.
C. The City Manager or his or her designee may, by written instrument signed by the Parties, extend the duration of this Contract for one (2) additional one-year extensions in the manner provided in Section 5, provided that the extension has received advance approval by the California Department of Transportation (Caltrans) and provided the extension does not require the payment of compensation in excess of the Council approved budget.
3. COMPENSATION:
A. The Consultant shall be paid monthly for the actual fees, costs and expenses, but in no event shall total compensation exceed Eight Hundred Forty-Seven Thousand, Five Hundred Seventy-Eight dollars ($847,578), without City’s prior written approval. Consultant's fees shall be as specified in the Schedule of Fees, which is attached hereto an incorporated herein as Exhibit "C".
B. Said amount shall be paid upon submittal of monthly billing showing completion of the tasks that month. Consultant shall furnish City with invoices for all expenses, including subconsultant expenses, as well as for all materials authorized by this Contract. The invoices shall be submitted with the monthly billings. If Consultant’s performance is not in conformity with the Schedule of Performance, payments may be delayed or denied, unless the Consultant’s failure to perform in conformity with the Schedule of Performance is a documented result of the City’s failure to conform with the Schedule of Performance, or if the Schedule of Performance is extended pursuant to Section 5.
C. If the work is halted at the request of the City, compensation shall be based upon the proportion that the work performed bears to the total work required by this Contract, subject to Section 4.
4. TERMINATION:
A. This Contract may be terminated by either party, provided that the other party is given not less than 30 calendar days’ written notice (delivered by certified mail, return receipt requested) of intent to terminate.
B. The City may temporarily suspend this Contract, at no additional cost to City, provided that the Consultant is given written notice (delivered by certified mail, return receipt requested) of temporary suspension. If City gives such notice of temporary suspension, Consultant shall immediately suspend its activities under this Contract. 73 WSP USA
Contract Number – West Sac Forward Transit Priority Plan Expires on June 30, 2028
3 11.4.2024
C. Notwithstanding any provisions of this Contract, Consultant shall not be relieved of liability to the City for damages sustained by the City by virtue of any breach of this Contract by Consultant, and the City may withhold any payments due to Consultant until such time as the exact amount of damages, if any, due the City from Consultant is determined.
D. In the event of termination, the Consultant shall be compensated as provided for in this Contract, except as provided in Section 4C. Upon termination, the City shall be entitled to all work, including but not limited to, appraisals, inventories, studies, analyses, drawings and data estimates performed to that date in accordance with Section 7 hereof.
5. AMENDMENTS, CHANGES OR MODIFICATIONS:
Amendments, changes or modifications in the terms of this Contract may be made at any time by mutual written agreement between the parties hereto and shall be signed by the persons authorized to bind the parties hereto.
6. EXTENSIONS OF TIME:
Consultant may, for good cause, request extensions of time to perform the services required hereunder. Such extensions shall be authorized in advance by the City in writing and shall be incorporated in written amendments to this Contract or the attached Work Program in the manner provided in Section 5.
This is a partially grant-funded project awarded by the California Department of Transportation (Caltrans) under their Sustainable Transportation Planning grant program. All work must be concluded by the consultant team and all final invoices must be received and approved by the City before June 30, 2028. All time extensions beyond June 30, 2028, must be approved by Caltrans prior to authorization by the City of West Sacramento.
7. PROPERTY OF CITY:
A. It is mutually agreed that all materials prepared by the Consultant under this Contract shall become the property of the City, and the Consultant shall have no property right therein whatsoever. Immediately upon termination, the City shall be entitled to, and the Consultant shall deliver to the City, all data, drawings, specifications, reports, estimates, summaries and other such materials as may have been prepared or accumulated to date by the Consultant in performing this Contract which is not Consultant’s privileged information, as defined by law, or Consultant’s personnel information, along with all other property belonging exclusively to the City which is in the Consultant’s possession.
B. Additionally, it is agreed that the parties intend this to be a contract for services and each considers the products and results of the services to be rendered by Consultant hereunder (the “Work”) to be a work made for hire. Consultant acknowledges and agrees that the Work (and all rights therein, including, without limitation, copyright) belongs to and shall be the sole and exclusive property of the City.
8. COMPLIANCE WITH ALL LAWS:
A. Consultant shall comply with all applicable laws, ordinances, and codes of federal, State and local governments, and shall commit no trespass on any public or private property in 74 WSP USA
Contract Number – West Sac Forward Transit Priority Plan Expires on June 30, 2028
4 11.4.2024
performing any of the work authorized by this Contract. It shall be City’s responsibility to obtain all rights of way and easements to enable Consultant to perform its services hereunder.
Consultant shall assist City in providing the same.
B. Consultant warrants to the City that it is licensed by all applicable governmental bodies to perform this Contract and will remain so licensed throughout the progress of the Work, and that it has, and will have, throughout the progress of the Work, the necessary experience, skill and financial resources to enable it to perform this Contract.
9. WARRANTIES AND RESPONSIBILITIES - CONSULTANT:
A. Consultant agrees and represents that it is qualified to properly provide the services set forth in Exhibit “A” in a manner which is consistent with the generally accepted standards of Consultant’s profession.
B. Consultant agrees and represents that the work performed under this Contract shall be in accordance with applicable federal, State and local law in accordance with Section 17A hereof.
C. Consultant shall designate a project manager who at all times shall represent the Consultant before the City on all matters relating to this Contract. The project manager shall continue in such capacity unless and until he or she is removed at the request of the City, is no longer employed by Consultant, or is replaced with the written approval of the City, which approval shall not be unreasonably withheld.
D. Consultant shall provide corrective services without charge to the City for services which fail to meet the above professional and legal standards and which are reported to Consultant in writing within sixty (60) days of discovery. Should Consultant fail or refuse to perform promptly its obligations, the City may render or undertake performance thereof and the Consultant shall be liable for any expenses thereby incurred.
10. SUBCONTRACTING:
None of the services covered by this Contract shall be subcontracted without the prior written consent of the City, which will not be unreasonably withheld. Consultant shall be as fully responsible to the City for the negligent acts and omissions of its contractors and subcontractors, and of persons either directly or indirectly employed by them, as it is for the negligent acts and omissions of persons directly employed by Consultant.
11. ASSIGNABILITY:
Consultant shall not assign or transfer any interest in this Contract whether by assignment or novation, without the prior written consent of the City which will not be unreasonably withheld.
However, claims for money due or to become due Consultant from the City under this Contract may be assigned to a financial institution, or to a trustee in bankruptcy, without such approval.
Notice of any assignment or transfer whether voluntary or involuntary shall be furnished promptly to the City.
12. INTEREST IN CONTRACT:
Consultant covenants that neither it, nor any of its employees, agents, contractors, 75 WSP USA
Contract Number – West Sac Forward Transit Priority Plan Expires on June 30, 2028
5 11.4.2024
subcontractors has any interest, nor shall they acquire any interest, direct or indirect, in the subject of the Contract, nor any other interest which would conflict in any manner or degree with the performance of its services hereunder. Consultant shall make all disclosures required by the City’s conflict of interest code in accordance with the category designated by the City, unless the City Manager determines in writing that Consultant’s duties are more limited in scope than is warranted by the category designated by the City code and that a narrower disclosure category should apply. Consultant also agrees to make disclosure in compliance with the City conflict of interest code if, at any time after the execution of this Contract, City determines and notifies Consultant in writing that Consultant’s duties under this Contract warrant greater disclosure by Consultant than was originally contemplated. Consultant shall make disclosures in the time, place and manner set forth in the conflict of interest code and as directed by the City.
13. MATERIALS CONFIDENTIAL:
All of the materials prepared or assembled by Consultant pursuant to performance of this Contract are confidential and Consultant agrees that they shall not be made available to any individual or organization without the prior written approval of the City, except by court order.
14. LIABILITY OF CONSULTANT-NEGLIGENCE:
Consultant shall be responsible for performing the work under this Contract in a manner which is consistent with the generally-accepted standards of the Consultant’s profession and shall be liable for its own negligence and the negligent acts of its employees, agents, contractors and subcontractors. The City shall have no right of control over the manner in which the work is to be done but only as to its outcome, and shall not be charged with the responsibility of preventing risk to Consultant or its employees, agents, contractors or subcontractors.
15. INDEMNITY AND LITIGATION COSTS:
Consultant shall indemnify, defend, and hold harmless the City, its officers, officials, agents, and employees against all claims, damages, demands, liability, costs, losses and expenses, including without limitation court costs and reasonable attorneys’ fees, arising from Consultant's negligent acts or negligent failure to act, errors, omissions or willful misconduct incident to the performance of this Contract except such loss or damage caused by the active negligence, sole negligence, or willful misconduct of the City. The provisions of this paragraph shall survive termination or suspension of this Contract.
16. CONSULTANT TO PROVIDE INSURANCE:
A. Consultant shall not commence any work before obtaining, and shall maintain in force at all times during the duration and performance of this Contract, the policies of insurance specified in this Section. Such insurance must have the approval of the City as to limit, form, and amount, and shall be placed with insurers with a current A.M. Best’s rating of no less than A VII (an NR rating is acceptable for Worker’s Compensation insurance written with the State Compensation Insurance Fund of California).
B. Prior to execution of this Contract and prior to commencement of any work, the Consultant shall furnish the City with certificates of insurance and copies of endorsements providing evidence of coverage for all policies required by the Contract. The Consultant and its contractors and subcontractors shall, at their expense, maintain in effect at all times during the performance of work under the Contract not less than the following coverage and limits of 76 WSP USA
Contract Number – West Sac Forward Transit Priority Plan Expires on June 30, 2028
6 11.4.2024
insurance, which shall be maintained with insurers and under forms of policy satisfactory to the City. The maintenance by Consultant and its contractors and subcontractors of the following coverage and limits of insurance is a material element of this Contract. The failure of Consultant or of any of its contractors or subcontractors to maintain or renew coverage or to provide evidence of renewal may be treated by the City as a material breach of this Contract. Approval of the insurance by the City shall not relieve or decrease any liability of Consultant.
1. Worker’s Compensation and Employer’s Liability Insurance
a. Worker’s Compensation - Insurance to protect the Consultant, its contractors and subcontractors from all claims under Worker’s Compensation and Employer’s Liability Acts, including Longshoremen’s and Harbor Worker’s Act (“Acts”), if applicable. Such coverage shall be maintained, in type and amount, in strict compliance with all applicable state and Federal statutes and regulations.
The Consultant shall execute a certificate in compliance with Labor Code Section 1861, on the form provided in the Contract Documents.
b. Consultant shall provide a Waiver of Subrogation endorsement in favor of the City, its officers, officials, employees, agents and volunteers for losses arising from work performed by the Consultant.
2. Commercial General Liability Insurance
a. The insurance shall be provided on form CG0001, or it’s equivalent, and shall include coverage for claims for bodily injury or property damage arising out of premises/operations, products/completed operations, contractual liability, and subconsultant’s work and personal and advertising injury resulting from actions, failures to act, or operations of the insured, or by its employees or agents, or by anyone directly or indirectly employed by the insured. The amount of insurance coverage shall not be less than $1,000,000 per occurrence and $2,000,000 general and products/completed operations aggregates. b. The commercial general liability insurance shall also include the following:
i. Endorsement equivalent to CG 2010 0714 naming the City, its officers, officials, employees, agents, and volunteers as additional insureds. The endorsement shall contain no special limitations on the scope of protection afforded to the City, its officers, officials, employees or volunteers.
ii. Endorsement stating insurance provided to the City shall be primary as respects the City, its officers, officials, employees and any insurance or self insurance maintained by the City, its officers, officials, employees or volunteers shall be in excess of the Consultant’s insurance and shall not contribute with it, to the payment or satisfaction of any defense expenses, loss, or judgment.
iii. Provision or endorsement stating that the Consultant’s insurance shall apply separately to each insured against whom claim is 77 WSP USA
Contract Number – West Sac Forward Transit Priority Plan Expires on June 30, 2028
7 11.4.2024
made or suit is brought, except with respect to the limits of the insurer’s liability.
3. Commercial Automobile Insurance
a. The insurance shall include, but shall not be limited to, coverage for claims for bodily injury or property damage for owned, non-owned, and hired automobiles resulting from actions, failures to act, or operations of the insured, or by its employees or agents, or by anyone directly or indirectly employed by the insured. The amount of insurance coverage shall not be less than $1,000,000 per accident.
b. The commercial automobile insurance shall include the same endorsements required for the commercial general liability policy (see Section
16.B.2.b).
4. Professional Liability. The Consultant and its contractors and subcontractors shall secure and maintain in full force, during the term of this Contract and for five years thereafter, professional liability insurance policies appropriate to the respective professions and the work to be performed as specified in this Contract. The limits of such professional liability insurance coverage shall not be less than $1,000,000 per claim.
C. In addition to any other remedy the City may have, if Consultant fails to maintain the insurance coverage as required in this Section, the City may obtain such insurance coverage as is not being maintained, in form and amount substantially the same as is required herein, and the City may deduct the cost of such insurance from any amounts due or which may become due Consultant under this Contract.
D. No policy required by this Contract shall be suspended, cancelled, terminated by either party, or reduced in coverage or in limits unless Consultant has provided thirty (30) days prior written notice by certified mail, return receipt requested, to the City.
E. Any deductibles or self-insured retentions in excess of $10,000 must be declared to, and approved by, the City.
F. The requirement as to types, limits, and the City’s approval of insurance coverage to be maintained by Consultant are not intended to, and shall not in any manner, limit or qualify the liabilities and obligations assumed by Consultant under the Contract.
17. MISCELLANEOUS PROVISIONS:
A. Consultant shall keep itself fully informed of, shall observe and comply with, and shall cause any and all persons, firms or corporations employed by it or under its control to observe and comply with, applicable federal, state, county and municipal laws, ordinances, regulations, orders and decrees which in any manner affect those engaged or employed on the work described by this Contract or the materials used or which in any way affect the conduct of the work.
B. Consultant shall not engage in unlawful employment discrimination. Such unlawful employment discrimination includes, but is not limited to, employment discrimination based upon 78 WSP USA
Contract Number – West Sac Forward Transit Priority Plan Expires on June 30, 2028
8 11.4.2024
a person’s race, religious creed, color, national origin, ancestry, physical handicap, medical condition, marital status, gender, citizenship, or sexual orientation.
C. This Contract is funded in-part through grant funds received under the California Department of Transportation (Caltrans) Sustainable Transportation program. In accordance with the Sustainable Communities Grant (State SB-1) Restricted Grant Agreement (the “Grant”), the terms of which are incorporated herein, Consultant scope of work and period of performance must be consistent with the Caltrans approved Scope of Work and Schedule as presented in the RFP.
A copy of the Grant and any related materials have been made available to Consultant, and Consultant shall ensure that its performance under this Contract, and that of any subcontractors, conforms to the requirements of the Grant[s].These requirements include, but are not necessarily limited to, compliance with the terms set forth in Exhibit “D”.
D. Consultant shall maintain and make available for inspection by the City and its auditors accurate records of all of its costs, disbursements and receipts with respect to any work under this Contract. Such inspections may be made during regular office hours at any time until six (6) months after the final payments under this Contract are made to the Consultant.
E. This Contract constitutes the entire agreement between the parties relative to the services specified herein and no modification hereof shall be effective unless and until such modification is evidenced by a writing signed by both parties to this Contract. There are no understandings, agreements, conditions, representations, warranties or promises, with respect to this Contract, except those contained in or referred to in the writing.
F. All notices that are required to be given by one party to the other under this Contract shall be in writing and shall be deemed to have been given if delivered personally or enclosed in a properly addressed envelope and deposited in a United States Post Office for delivery by registered or certified mail addressed to the parties at the following addresses:
City: City of West Sacramento
Attn to: Jason McCoy, AICP, Transportation Div. Mgr.
1110 West Capitol Avenue, 2nd Floor
West Sacramento, CA 95691
Email: [email protected]
Consultant: WSP USA
Attn to: Brad Brey, AICP, VP, Project Management
1001 Fourth Avenue
Seattle, WA 98154
Email: [email protected]
G. This Contract shall be interpreted and governed by the laws of the State of California.
H. Any action arising out of this Contract shall be brought and maintained in Yolo County California, regardless of where else venue may lie.
I. In any action brought by either party to enforce the terms of this Contract, each party shall be bear responsibility for its attorney’s fees and all costs regardless of whether one party is determined to be the prevailing party.
79 WSP USA
Contract Number – West Sac Forward Transit Priority Plan Expires on June 30, 2028
9 11.4.2024
J. ELECTRONIC TRANSMISSION OF CONTRACT AND SIGNATURE. By electronically signing this document in electronic form, Parties agree that this Agreement may be transmitted and signed electronically by all Parties, and that such signatures shall have the same force and effect as original signatures, in accordance with California law and regulations, including but not limited to Civil Code Section 1633.7
CITY OF WEST SACRAMENTO
By: __________________________
Amanda Berlin, Assistant City Manager
ATTEST:
By: _______________________
Jennifer Cusmir, City Clerk
APPROVED AS TO FORM:
By: _______________________
Jeffrey Mitchell, City Attorney
WSP USA
By: _________________________
Ali H. Mir, ENV SP
Principal-in-Charge, West Regional Planning
Lead
80 WSP USA
Contract Number – West Sac Forward Transit Priority Plan Expires on June 30, 2028
EXHIBIT A
Consultant Proposal/Scope of Work
81 METHODOLOGY AND
APPROACH BY TASK
The WSP will create a set of actionable strategies to guide the future transit network for West Sacramento.
Our methodology focuses on the following principles:
Equity-First: Prioritize disadvantaged, transitdependent, and under-represented communities, VSHFL¿FDOO\WKRVHORFDWHGLQ6HQDWH%LOOGHVLJQDWHG disadvantaged communities such as Bryte and
Broderick.
Transparency: Ensure open communication and visible
accountability.
Data + Storytelling: Blend technical rigor with clear, visual storytelling for accessibility.
Scalability: Build strategies aligned with city growth, equity, and climate goals that are adaptable to funding availability and growth.
Regional Integration: Align with SacRT, YoloTD,
SACOG, and Caltrans priorities.
Actionability: Provide implementable, near-term
recommendations alongside long-range strategies.
Our approach ensures that each step of the process from GDWDFROOHFWLRQWR¿QDODGRSWLRQLVWUDQVSDUHQWLQFOXVLYH and aligned with the City’s vision. By balancing technical analysis with meaningful engagement and practical
LPSOHPHQWDWLRQVWUDWHJLHVWKH¿QDOSODQZLOOQRWRQO\ identify transit priorities but also position West Sacramento for success in securing funding, building partnerships, and achieving long-term transit sustainability.
Project Administration
(ႇHFWLYHSURMHFWDGPLQLVWUDWLRQLVIXQGDPHQWDOWRWKH
success of the West Sac Forward Transit Priority Plan.
This task will establish the framework for coordinating with the City of West Sacramento and Caltrans, to ensuring all activities remain compliant with state grant requirements ZKLOHPDLQWDLQLQJHႈFLHQF\DQGWUDQVSDUHQF\WKURXJKRXW the project. Responsiveness, accountability, and quality will guide the administration of the plan.
Brad Brey will serve as the Project Manager and will be the primary point of contact for the City of West Sacramento.
Brad will be available throughout the project to provide oversight, manage resources, and ensure deliverables
are completed on schedule and in alignment with project goals. Project administration will emphasize frequent
communication with project partners, systematic tracking of project milestones, and strict adherence to Caltrans’ reporting requirements.
Distinct Project Management Approach
Brad is a hands-on Project Manager who has
served as a Deputy or Project Manager on over
൭൫WUDQVLWSURMHFWVUDQJLQJIURPV\VWHPZLGH
studies to corridor focused studies. He will
guide the team and deploy the right tools at
the right time to ensure project success.
Project Management Plan
Upon notice to proceed, we will work with the City to
develop a Project Management Plan (PMP) that outlines
roles and responsibilities, communications protocols, and monitoring procedures. This plan will focus on meeting task REMHFWLYHVZKLOHDQWLFLSDWLQJSURMHFWZLGHQHHGV6SHFL¿F elements will include:
Communications Protocols: 'H¿QHGPHWKRGV
RIFRRUGLQDWLRQZLWK&DOWUDQV&LW\VWDႇDQGWUDQVLW
partners; documentation of key meetings; and regular
progress check-ins. All deliverables will be stored on a SharePoint site administered by WSP and shared with
the City for easy collaboration.
Schedule and Reporting Tools: Progress monitoring
tools that track task completion, budget utilization, and upcoming deliverables in accordance with Caltrans grant requirements.
Quality Management Oversight: Clear procedures to
ensure accuracy, consistency, and completeness of all
materials prior to submission.
Compliance with Caltrans Requirements: Quarterly
reporting and invoicing will follow Caltrans’ guidelines, ensuring administrative tasks are performed correctly
DQGHႈFLHQWO\
Invoicing: Monthly invoices and progress reports will be provided to align costs and project progress.
We will share the draft PMP with the City for one round of UHYLHZIROORZHGE\D¿QDOYHUVLRQDGGUHVVLQJDOOFRPPHQWV and edits.
Meetings
In addition to creating the PMP, we will schedule a project NLFNRႇPHHWLQJZLWKWKH&LW\,WZLOOWDNHSODFHYLUWXDOO\RU in-person, depending on budget and City preferences.
The meeting will serve as an opportunity for everyone to introduce themselves and their role on the project, talk through any initial data requests and work products, and discuss project objectives, scope, timelines, and key
milestones. We will develop an agenda that will be shared at least three days before the meeting and share meeting notes no later than three days after the meeting.
Regular communication between the consultant team
and the City will ensure alignment on the development of deliverables and overall trajectory of the project. We will City of West Sacramento | West Sac Forward Transit Priority Plan | 26-043-RFP Page 23 Technical Project Approach | WSP
82 schedule virtual bi-weekly check-in meetings with the City to discuss progress on the project, any outstanding items, and next steps. We will develop agendas for each meeting which will be sent at least three days before the meetings, as well as meeting notes, which will be sent no later than three days after the meetings.
Quality Assurance/Quality Control
A Quality Assurance and Quality Control (QA/QC) program will be prepared as part of the PMP that aligns with the City and Caltrans’ procedures and policies. Quality is
IRXQGDWLRQDOWRRXUWHDP¶VYDOXHVDQGZRUNDVH[HPSOL¿HG by our inclusion of a dedicated QA/QC lead in our
organization chart, David Schumacher, who will oversee
implementation of the quality program.
:63PDLQWDLQVFHUWL¿FDWLRQXQGHUWKH,QWHUQDWLRQDO
Organization for Standardization (ISO) 9001 Quality
Management System. Brad will be overseeing the delivery of every task/deliverable, monitoring project progress, communicating regularly with the City, and should
unexpected changes occur, working with the City’s Project Manager, to develop and execute a recovery plan.
WSP employs a holistic and comprehensive QA/QC approach for all projects.
Deliverables
9.LFNRႇPHHWLQJ
ZLWKDJHQGDDQGPHHWLQJQRWHV
ZLWK
the City and Caltrans
9Bi-weekly meetings (with agendas and meeting notes)
with the City
9Draft and Final PMP
9Invoicing and quarterly reporting to Caltrans
9Monthly invoices and progress reports
7DVN൬
'DWD&ROOHFWLRQ
Establishing a robust baseline of existing conditions
is critical to identifying current strengths, gaps, and opportunities in the West Sacramento transit network.
This work will form the foundation for the assessment and recommendations in Task 2. Recent activities have created a strong backbone of data for the plan, including the
recently updated citywide Travel Demand Model, collected WUDႈFFRXQWVDQG¿QGLQJVIURP<ROR7'¶V6573ZKLFKZDV developed by TMD. TMD’s work on the SRTP will enable
us to quickly understand existing conditions within the city, including travel patterns, transit performance, and potential changes to the existing transit network. In addition,
feedback from the community received during that study
will inform an understanding of public sentiment around various service types.
Task Lead Erik Bird will guide a structured data collection process that draws from the existing data sources, as well as relevant local, regional, and state sources, and original VXUYH\VDQG¿HOGZRUN(ULNKDVOHGWKHFROOHFWLRQRIVLPLODU transit operations data as part of the system analysis
portion of the PCTPA COA/SRTP, infrastructure and safety data to improve active transportation safety as part of the San Mateo County Transportation Authority’s (SMCTA) El
Camino Real Complete Streets Plan and 101 Corridor Plan, and land use and planning data to ensure transit served NH\GHVWLQDWLRQVHႇHFWLYHO\DVSDUWRIWKH7DKRH7UXFNHH Area Regional Transportation’s Systems Plan Update. To
supplement the collection of existing publicly available data, we will develop a list of data requests that will be distributed to the City, YoloTD, Via, SACOG, and other
project partners as necessary.
Transit Operations Data
Determining how well the existing transit network in the City performs will be key to seeing where gaps exist when proposing improvements. The analysis will focus on YoloTD and Via Rideshare ridership, routes and service areas,
schedules, and service performance. Our streamlined
approach allows us to incorporate TMD’s work on the
SRTP and will include coordinating with YoloTD, Via, and the City to determine the following sets of information:
Ridership: Boardings and alightings by stop and route, GLVDJJUHJDWHGE\SHDNRႇSHDNDQGGD\RIZHHNWR
understand travel patterns. Historical data will also be reviewed to identify trends over time.
Route and Schedule Information: Service
frequencies, headways, stop locations, and route
alignments will be documented to assess coverage and
reliability.
Performance Metrics: On-time performance, dwell
times, and trips per revenue hour will be analyzed to
diagnose operational bottlenecks.
A Project Chartering Session could be an optional task
that allows the project team to bring together vested
VWDNHKROGHUVVXFKDV<ROR7'9LDDQG6DF57WRWKH
table early to ensure all are on the same page related to WKHSURMHFW¶VYLVLRQJRDOVDQGDQWLFLSDWHGRXWFRPHV Feedback received during this Chartering Session can
guide the overarching process. A Project Chartering
Session can help ensure alignment across stakeholders
early.
Technical Project Approach | WSP
City of West Sacramento | West Sac Forward Transit Priority Plan | 26-043-RFP 83 Page 24 7UDႈF,QIUDVWUXFWXUH'DWD
:HZLOODVVHVVWUDႈFSDWWHUQVWKDWLPSDFWWUDQVLWUHOLDELOLW\ by collecting:
7UDႈF9ROXPHV
Analyze the recently updated
FLW\ZLGH7UDYHO'HPDQG0RGHODQGFRPSOHWHGWUDႈF
counts to determine volumes along key corridors and
DWPDMRULQWHUVHFWLRQVLQFOXGLQJSHDNKRXUÀRZVWR
determine areas of higher congestion.
Intersection Performance: Signal timing plans, cycle
lengths, queue lengths, and turning movements that
DႇHFWEXVSURJUHVVLRQ
Vehicle Speeds: Average and spot speeds for transit
YHKLFOHVFRPSDUHGZLWKJHQHUDOWUDႈF
Transit and Road Infrastructure Data
We will evaluate the infrastructure supporting transit, including:
Stops and Stations: Location, amenities, ADA accessibility, and boarding/alighting activity. Right-of-Way Characteristics:/DQHFRQ¿JXUDWLRQVFXUEVLGHXVHVDQGSDUNLQJORDGLQJ]RQHVWKDWPD\FRQVWUDLQ transit priority.
&UDVKDQG&RQÀLFW'DWD
Analyze data from the University of California, Berkeley’s Transportation Injury Mapping 6\VWHPWRGHWHUPLQHORFDWLRQVDQGFRQWULEXWLQJIDFWRUVRIFROOLVLRQVDQGUHFXUULQJFRQÀLFWSRLQWVZLWKSHGHVWULDQV F\FOLVWVRUJHQHUDOWUDႈF
Future Capital Projects:5HYLHZXSFRPLQJFDSLWDOSURMHFWVDVLGHQWL¿HGE\WKH&LW\¶V&DSLWDO3URMHFWV'HSDUWPHQW TMD mapped bus stop locations by ridership for the YoloTD SRTP to determine areas with higher boarding activity.
$VSDUWRIWKH,QWHUFLW\7UDQVLW%57,PSOHPHQWDWLRQ3ODQ:63¶VGDWDWHDPDVVHVVHGFXUUHQWEXVVSHHGVYVJHQHUDOWUDF speeds to identify congestion hotspots for speed and reliability treatments.
Technical Project Approach | WSP
City of West Sacramento | West Sac Forward Transit Priority Plan | 26-043-RFP 84 3DJH WSP analyzed the collision history along and across US 101 in San Mateo County as part of the 101 Corridor Connect Program. This led to identifying projects for future funding opportunities that would improve safety in these areas.
Transportation-Related Environmental Data
We will work with the City and SACOG to gather
transportation-related environmental indicators from the citywide and SACOG regional travel demand models,
including Vehicle Miles Traveled (VMT) and Greenhouse
Gas (GHG) emissions. This will establish a baseline for HYDOXDWLQJWKHHQYLURQPHQWDOEHQH¿WVRIWUDQVLWSULRULW\ strategies.
Travel Behavior Data
We will leverage previously collected rider surveys
conducted as part of the YoloTD SRTP to understand
origin-destination patterns, mode choice, and perceptions of service quality. This approach allows us to gather
data while avoiding survey exhaustion by riders. Broader travel behavior, including mode share (auto, transit, bike, walk, micromobility, rideshare), trip purposes, and shared mobility use, will also be captured.
Land Use and Planning Data
Understanding the intersection of the City’s land use
patterns and transportation network will be critical to developing future transportation improvements that align with the City’s project growth areas and key trip generators.
We will document how land use and density intersect with transit service by reviewing:
City of West Sacramento’s General Plan 2035
SACOG’s 2025 Blueprint
West Sacramento Mobility Action Plan
6SHFL¿FPDVWHUSODQVVXFKDVWKH%ULGJH'LVWULFW
6SHFL¿F3ODQDQG:DVKLQJWRQ6SHFL¿F3ODQDPRQJ
others
7UDQVLWGLVWULFWSODQQLQJHႇRUWV
Key trip generators, including employment centers,
schools, retail, medical facilities, and cultural
destinations
This will allow us to identify where land use can support stronger transit investments.
Deliverables
9Draft and Final Existing Conditions Technical Report
As part of the Systems Plan Update for Tahoe Truckee
Area WSP mapped key destinations for the Tahoe Truckee
Area Regional Transportation’s Systems Plan Update that were used when determining service changes to ensure
improvements were provided to these areas that may be
more conducive to high ridership.
Technical Project Approach | WSP
City of West Sacramento | West Sac Forward Transit Priority Plan | 26-043-RFP 85 Page 26 7DVN൭
0DUNHW&RQGLWLRQVDQG6HUYLFH
Analysis
TMD brings directly relevant and current knowledge to
Task 2 as they are actively engaged with YoloTD on their 6573JLYLQJRXUWHDP¿UVWKDQGIDPLOLDULW\ZLWK YoloTD’s ridership recovery challenges, proposed service restructuring, and the operational realities of the Yolobus network in West Sacramento.
We understand the layered institutional context of transit service in this region, including the overlapping roles of YoloTD, SacRT, and the City’s Via Rideshare program, and how those relationships shape what is feasible, fundable, and implementable.
$QDO\VLVRI([LVWLQJ7UDQVLW0DUNHW&RQGLWLRQV
The WSP team will build on the data collected in Task 1 and applying a combination of proven analytical tools, big data, and regional knowledge to evaluate existing transit market conditions to identify demand potential, develop GHWDLOHGFRUULGRUSUR¿OHVDQGDVVHVVWUDQVLWWHFKQRORJLHV and best practices relevant to West Sacramento’s
near-term and long-term transit investment needs.
As part of the Swift Gold Line Scoping Study and Alternatives Analysis, WSP completed a robust existing and future
conditions assessment to determine potential routing options in areas with limited existing transit service.
([LVWLQJ0DUNHW$QDO\VLV
A comprehensive understanding of West Sacramento’s
transit market is foundational to evaluating current service and identifying where investment will have the greatest impact. The WSP team’s market assessment will examine the population distribution, density, income levels, employment centers, and socioeconomic factors that shape transit
demand across West Sacramento’s neighborhoods and
corridors.
We will use ArcGIS to map population and employment
densities and develop individual demographic maps for
seniors, youth, persons with disabilities, zero-vehicle households, low-income households, and limited-EnglishSUR¿FLHQF\SRSXODWLRQVEDVHGRQGDWDIURPWKH86 Census or the most recent American Community Survey
estimates. These layers will be compiled into a Transit 'HPDQG3RWHQWLDO,QGH[WKDWLGHQWL¿HVZKHUHWKHPDUNHW conditions are strongest for transit investment and where equity-focused improvements are most needed.
In addition, we will leverage previous analysis done
through the YoloTD SRTP to evaluate current transit
services provided by YoloTD and Via, assessing coverage, frequency, accessibility, and reliability. Underserved areas DQGVHUYLFHJDSVZLOOEHLGHQWL¿HGE\FRPSDULQJWUDQVLW supply against the demand potential mapping. We will
analyze trip patterns, customer satisfaction, and modal preferences using available rider surveys, on-demand
trip data, and existing service data, and assess the role of alternative modes, including the City’s Via Rideshare program and regional ride-hailing services. Where
applicable, we will benchmark West Sacramento’s transit performance (such as on-time performance) against peer
cities and regions to identify areas for improvement.
VALUE TO WEST SAC
70'LVFXUUHQWO\OHDGLQJWKH<ROR7'6573UHVXOWLQJ
LQGLUHFWFXUUHQWNQRZOHGJHRIWKHVHUYLFHUHVWUXFWXULQJ DOWHUQDWLYHVXQGHUDFWLYHFRQVLGHUDWLRQLQFOXGLQJWKH SURSRVHGHOLPLQDWLRQRI5RXWHV൯൫൯൬DQG൭൯൫
IUHTXHQF\
LPSURYHPHQWVRQ5RXWHV൯൭$%
PRGL¿FDWLRQVWR5RXWH
൮൲DQGWKHQHZ5RXWH൮൳7KLVFRQWLQXLW\PHDQVRXU
DQDO\VLVZLOOUHÀHFWQRWMXVWWKHFXUUHQWQHWZRUNEXWWKH near-term network YoloTD is actively moving toward.
Trend Analysis and Scenario Development
Our team will examine trends in urban development,
population growth, and economic activity in West
Sacramento and the surrounding region, drawing on
the City’s General Plan, SACOG’s 2025 Blueprint, the
%ULGJH'LVWULFW6SHFL¿F3ODQWKH:DVKLQJWRQ6SHFL¿F
Plan, and the Southport Framework Plan. We will assess
how technological developments and state and regional
policy changes, including California’s VMT and GHG
Technical Project Approach | WSP
City of West Sacramento | West Sac Forward Transit Priority Plan | 26-043-RFP 86 Page 27 UHGXFWLRQWDUJHWVDQG6%UHTXLUHPHQWVDUHDႇHFWLQJ transit demand and the competitive landscape for transit investment.
The WSP team will develop the scenario parameters
and assumptions framework for baseline, optimistic, and conservative future transit market conditions. Parameters ZLOOGUDZRQ5HSOLFDGDWDH[LVWLQJFRQGLWLRQV¿QGLQJV SACOG SACSIM23 inputs, and TMD’s current knowledge
of YoloTD’s proposed service restructuring to anchor each scenario in observed travel behavior. The completed
IUDPHZRUNZLOOEHKDQGHGRႇWR:63IRUTXDQWLWDWLYH
modeling outputs.
Ridership Forecasting
Using predictive modeling and SACOG’s travel demand
tools, we will estimate ridership under each scenario.
External factors such as telecommuting, fuel prices, and EV adoption will be incorporated. Forecasts will focus on near-term (2035) and long-term (2050) demand.
Infrastructure and Policy Impacts
The WSP team will evaluate how planned projects and
SROLF\LQLWLDWLYHVDUHOLNHO\WRDႇHFWWUDQVLWGHPDQGDQG market conditions in West Sacramento. This will include the Downtown Riverfront Streetcar LRT extension, the C
Street/Railyards Bridge, the Broadway Bridge, Enterprise &URVVLQJDQGWKH86-HႇHUVRQ%RXOHYDUG&RPPXQLW\
Connectivity Project. State and local policy initiatives relevant to transit priority, BRT development, and mode shift will also be assessed.
Travel Pattern Analysis
The WSP team will conduct a travel pattern analysis at two levels of granularity using available data sources, including the SACOG regional travel demand model outputs and
TMD’s licensed access to Replica, a big data platform
that provides weekly summaries of local travel demand by mode, time of day, and origin-destination pair.
At the regional level, the analysis will characterize how West Sacramento residents travel to key destinations across the Sacramento River and throughout Yolo County, identifying the strongest origin-destination pairs that should anchor future transit-priority investments and inform LRT and BRT alignment evaluation. At the corridor level, a TAZ-level analysis will identify which internal corridors generate and attract the most trips, providing a data-driven foundation for SULRULWL]LQJWUDQVLWLPSURYHPHQWVDORQJ-HႇHUVRQ%RXOHYDUG West Capitol Avenue, Harbor Boulevard, Lake Washington
Boulevard, and other key arterials.
Replica data has consistently challenged preconceived
assumptions about how people travel. Trip volumes are
RIWHQKLJKGXULQJRႇSHDNSHULRGVDQGPDQ\WULSVDUH
short-distance, which calls for transit solutions that go beyond traditional peak-period, long-distance commute
service. Understanding these actual travel patterns,
rather than assumed ones, is essential to identifying
where transit investment will unlock latent ridership and meaningful mode shift.
Regional and Local Transit Services
We will study the existing and planned transit network serving West Sacramento to understand regional connectivity,
current transit demand, and service needs. This will include H[LVWLQJDQGSODQQHG¿[HGURXWHEXVVHUYLFHDQGRQGHPDQG microtransit. Local bus ridership trends will be analyzed to LGHQWLI\ZKLFKURXWHVDQGVWRSVUHÀHFWKLJKWUDQVLWQHHGDQG demand, transit service gaps, and corridor candidates for transit priority treatment, BRT, or LRT investment.
Relevant plans and studies will inform the analysis, including the YoloTD 2024-2031 SRTP, the SacRT SRTP, SACOG’s
2025 Blueprint, the West Sacramento Mobility Action Plan, DQGDSSOLFDEOHFRUULGRUDQGVSHFL¿FSODQV
VALUE TO WEST SAC
TMD’s active engagement on the YoloTD SRTP provides
FXUUHQW¿UVWKDQGNQRZOHGJHRIWKHVHUYLFHUHVWUXFWXULQJ proposals and ridership recovery challenges shaping the near-term network.
&RUULGRU3UR¿OHV
Based on the existing conditions analysis, market analysis, travel pattern analysis, and service evaluation, we will SUHSDUHGHWDLOHGSUR¿OHVIRUHDFKFRUULGRUVWXGLHGWR
inform transit-priority treatment and public transit service LPSOHPHQWDWLRQ(DFKSUR¿OHZLOOLQFOXGHHDV\WRUHDG
maps and graphics of the following:
Route alignments, station/stop locations, and land use context
Population and employment density and transit demand potential
Current and projected ridership and on-demand usage
statistics
Key destinations and activity generators along the corridor On-time performance and travel time competitiveness data Physical constraints and challenges, including at-grade rail crossings, bridge chokepoints, right-of-way limitations, and IUHLJKWFRQÀLFWV
Opportunities aligned with planned development, equity community access needs, and infrastructure investments
Technical Project Approach | WSP
City of West Sacramento | West Sac Forward Transit Priority Plan | 26-043-RFP 87 Page 28 Preliminary recommendations for service improvements
and transit priority treatments
&RUULGRUSUR¿OHVZLOOEHGHVLJQHGWRVWDQGDORQHDVJUDQW ready documents for individual corridors, in addition to being integrated into the comprehensive service analysis UHSRUW7KHSUR¿OHVZLOOKLJKOLJKWFKDOOHQJHVRSSRUWXQLWLHV and recommendations.
To determine how well projects met the Sustainability goal of the 101 Corridor Connect program, WSP determined the proximity of each project to areas of San Mateo County
with varying levels of VMT. We know how to quantify the HQYLURQPHQWDOH௺HFWVRIFKDQJHVWRWKHWUDQVSRUWDWLRQQHWZRUN and will use this during our development of strategies.
Transit Technology and Best Practices
The WSP team will prepare a summary of transit modes,
technologies, and best practices relevant to West
Sacramento’s near-term and long-term priorities. This will include coordinating with the City and stakeholders to clearly GH¿QHZKDWWUDQVLWSULRULW\%57DQG/57
DQRYHUYLHZRIWKH
NH\HOHPHQWVDQGEHQH¿WVRIHDFKPRGH
DQGDUHYLHZRIKRZ
WKHVHPRGHVVXSSRUWWKH&LW\¶VRWKHUSODQQLQJHႇRUWV<ROR7' and SacRT transit strategies, and SACOG’s 2025 Blueprint.
New and emerging passenger information systems and
technologies will be introduced, including how they may be integrated within and alongside the current transit system.
The summary will identify current and planned technologies used by SacRT, YoloTD, Via, and Caltrans in corridor
management plans, and highlight lessons learned from
underperforming technologies, as well as best practices IRUPD[LPL]LQJULGHUVKLSFRVWHႇHFWLYHRSHUDWLRQVDQG governance. Technologies assessed will include:
Onboard and ITS technologies
Transit signal priority and queue jump systems
$OWHUQDWLYHIXHOVDQGHQHUJ\HႈFLHQWÀHHW
Autonomous and connected vehicle technologies
Transit lanes and dedicated right-of-way treatments
Other emerging technologies relevant to the Sacramento region operating environment
$OO¿QGLQJVWHFKQLFDOPHPRUDQGDDQGDQDO\VHVSURGXFHG under Task 2 will be compiled into Draft and Final Market Conditions and Service Analysis Reports. The reports will integrate the existing market conditions assessment, travel pattern analysis, regional and local transit service evaluation, FRUULGRUSUR¿OHVDQGDUHYLHZRIWUDQVLWWHFKQRORJ\DQG best practices into a single, cohesive document. The report will include supporting tables, maps, and graphics and will serve as the primary technical foundation for the corridor HYDOXDWLRQDQGSULRULWL]DWLRQZRUNLQ7DVN'UDIW¿QGLQJV DQGUHFRPPHQGDWLRQVZLOOEHSUHVHQWHGDVSDUWRIWKH¿UVW phase of community outreach and public engagement prior to ¿QDOL]DWLRQZLWKIHHGEDFNLQFRUSRUDWHGLQWRWKH)LQDO5HSRUW Deliverables
9Draft and Final Existing Market Conditions Technical Reports 9Draft and Final Future Market Projections Technical Reports 9Draft and Final Travel Pattern Analysis Technical Reports 9'UDIWDQG)LQDO&RUULGRU3UR¿OHV
9Presentation of Draft Findings and Recommendations
9Draft and Final Comprehensive Service Analysis Reports Technical Project Approach | WSP
City of West Sacramento | West Sac Forward Transit Priority Plan | 26-043-RFP 88 Page 29 7DVN൮
&RPPXQLW\2XWUHDFKDQG3XEOLF
Engagement
Inclusive, representative community outreach and public engagement is central to West Sacramento and will result LQDSODQWKDWUHÀHFWVWKHQHHGVRIFXUUHQWDQGIXWXUHWUDQVLW riders while building alignment with key partners needed IRULPSOHPHQWDWLRQ$VWKHEDFNERQHRIWKLVHႇRUWWKLV engagement process will strengthen the plan’s credibility by demonstrating equity, responsiveness, and community
support. A community-informed West Sac Forward
7UDQVLW3ULRULW\3ODQSRVLWLRQV&LW\&RXQFLOWRFRQ¿GHQWO\ advance and invest in the work, while also signaling project readiness and competitiveness for grants in a highly
competitive funding environment.
Public Information Plan: Setting the
Right Foundation
A thoughtfully designed Public Involvement Plan (PIP) will DOLJQWKH&LW\DQGSURMHFWWHDPRQDQHႇHFWLYHDSSURDFK to reaching your diverse communities. We recommend
a co-designed PIP development process, starting with
DQHQJDJHPHQWVSHFL¿FNLFNRႇWRFRQ¿UPJRDOVNH\
stakeholders, and an engagement schedule aligned with
technical milestones. Task Lead, Brett Salmi, will bring a draft PIP containing key elements, informed by the City of West Sacramento’s Transportation Community Engagement
3OD\ERRNWRIDFLOLWDWHDQHႈFLHQWGLVFXVVLRQ
7KLVNLFNRႇZLOODOVRJLYH&LW\VWDႇWKHRSSRUWXQLW\WRVKDUH OHVVRQVOHDUQHGIURPUHFHQWHႇRUWVVXFKDVWKH9LVLRQ=HUR Action Plan and/or the Bicycle, Pedestrian, and Trails Master Plan and will address opportunities to reduce engagement fatigue by using feedback from the YoloTD Short Range
Transit Plan (SRTP) as a starting point. The co-designed PIP will direct special attention to equity and tools and methods to reach environmental justice communities. Such actions may include preparing public-facing materials in Spanish, Russian, and Farsi (consistent with the City’s LEP Outreach Plan), providing interpretation at public meetings upon request, including community-based organization representatives in the Community Advisory Committee, partnering with local community leaders to serve as project ambassadors, and
hosting pop-events in partnership with events that celebrate West Sacramento’s diversity.
The WSP team has given thought to how this task can be
closely coordinated with the development of the technical deliverables, creating an iterative process. The process graphic is described in more detail below and is intended DVDQLQLWLDOFRQFHSWWREHUH¿QHGLQFROODERUDWLRQZLWK\RXU team.
TASK 01
Data
Collection
Prepare Outreach
Inform existing
conditions
Assess transit
priorities
WORKING GROUPS
& ADVISORY
COMMITTEES
N/A for this task
PUBLIC
ENGAGEMENT
PIP & Stakeholder
List
Pop-ups, online
survey, & map activity
COMMUNICATIONS
METHODS
Project Website and
Project Video
TASK 02
Market Conditions
& Service Analysis
Validate existing
conditions, market
conditions & service
analysis
'H¿QHJRDOV
objectives
WORKING GROUPS
& ADVISORY
COMMITTEES
TPM, TOG, CAC, TACs
PUBLIC
ENGAGEMENT
Open House #1
Pop-ups, online
survey, & map activity
COMMUNICATIONS
METHODS
Open House
1RWL¿FDWLRQ&DPSDLJQ
“You Said-We Did”
Report #1 & Survey
Summary with Word
Cloud
TASK 05
Funding &
Implementation
Plan
Review and
UH¿QH)XQGLQJ
Implemtation Plan
WORKING GROUPS
& ADVISORY
COMMITTEES
TPM, TOG, CAC, TACs
PUBLIC
ENGAGEMENT
N/A for this task
COMMUNICATIONS
METHODS
N/A for this task
TASK 04
Transit Corridor
Strategies
5H¿QHJRDOVDQG
objectives
&RQ¿UPFRPPXQLW\
priorities and
evaluation criteria
WORKING GROUPS
& ADVISORY
COMMITTEES
TPM, TOG, CAC, TACs
PUBLIC
ENGAGEMENT
Workshop #1
In-Person
Workshop #2 Virtual
COMMUNICATIONS
METHODS
:RUNVKRS1RWL¿FDWLRQ
Campaign
“You Said-We Did”
Report #2
TASK 06
West Sac Forward
Transit Priority
Plan
5HYLHZDQGUH¿QH
West Sac Foward
Transit Priority Plan
WORKING GROUPS
& ADVISORY
COMMITTEES
TPM, TOG, CAC, TACs
PUBLIC
ENGAGEMENT
Open House #2
COMMUNICATIONS
METHODS
Open House
1RWL¿FDWLRQ&DPSDLJQ
You Said-We Did
Report #3
TASK 07
Council Review
& Approval
Receive City Council
Approval
Announce adoption of
the plan
WORKING GROUPS
& ADVISORY
COMMITTEES
City Council Pres., TMI
Commission
PUBLIC
ENGAGEMENT
N/A for this task
COMMUNICATIONS
METHODS
Fact Sheet
Technical Project Approach | WSP
City of West Sacramento | West Sac Forward Transit Priority Plan | 26-043-RFP 89 Page 30 Public Engagement: Reaching Your Community
WSP is prepared to deliver the public engagement outlined in the RFP, including two open houses, two workshops,
pop-up events, and an online survey with a mapping
tool. Engagement will be coordinated with technical work so community input informs decision-making. We will
document how feedback is used through “You Said–We
Did” summaries posted online and will be reiterated
at open houses and workshops to demonstrate the
City of West Sacramento’s commitment to community
engagement.
Open Houses & Workshops
:HRႇHU\RXUWHDPH[SHULHQFHGHYHQWSODQQHUVZKRFDQ
support public events of any size. We design and facilitate both virtual and in-person meetings that present project ideas in clear, everyday language and use interactive
activities to encourage participation. In collaboration with your team, we aim to deliver well-attended events that
generate meaningful, actionable feedback. We anticipate the open house and workshop approach to include:
Open House #1: Introduce the project, build
momentum, and gather input on transit priorities,
mobility challenges, and desired improvements to inform early analysis.
Workshop #1 (Virtual):6KDUHUH¿QHGJRDOVDQGLQLWLDO ¿QGLQJVIURPWKH'UDIW&RPSUHKHQVLYH6HUYLFH$QDO\VLV
and gather additional feedback.
Workshop #2 (In-Person): Seek input on corridor
strategies, including prioritization and coordination with projects like regional LRT.
Open House #2: Present draft strategies and
recommendations, show how feedback was
LQFRUSRUDWHGDQGJDWKHU¿QDOLQSXWWRVKDSHWKHSODQ
The open houses and workshops are structured to be
iterative so that community feedback is consistently
considered and used to inform decision points. The team will also use these engagement opportunities to build
trust with the community by demonstrating how feedback
was used. The community should be able to see their
¿QJHUSULQWVRQWKHSURMHFWDVLWSURJUHVVHVEHWZHHQ
milestones.
Pop-Ups
:63UHJXODUO\SODQVGHVLJQVDQGVWDႇVSRSXSHYHQWV
for transportation agencies as a method of reaching
community members where they are,to gathering
quick input, boost project awareness, and encourage
participation at public meetings or by taking surveys.
For Alameda CTC, our interactive activities, such as
large participatory maps, regularly engaged 200-500+
participants per event. Our approach demonstrates our
ability to draw in diverse audiences. For West Sacramento, we will surface localized insights by converting casual interactions into meaningful input that can directly inform the existing conditions analysis.
Pop-up event organized and facilitated by the WSP team for the Alameda County Transportation Commission.
Online Surveys and Mapping Tools
WSP holds an all-inclusive license with Social Pinpoint, an online survey platform that provides the ability to create surveys as well as virtual mapping where participants can LGHQWLI\GHVWLQDWLRQV:63RႇHUVRXUFOLHQWVDFFHVVWRWKLV highly interactive platform without licensing fees, which are often otherwise cost prohibitive. On the Santa Fe Forward General Plan Update, WSP’s use of Social Pinpoint
resulted in approximately 800 survey responses and 600
mapped inputs. This level of participation illustrates how our toolkit can assist a project like yours in generating UREXVWJHRJUDSKLFDOO\VSHFL¿FGDWDWRVXSSRUWFRUULGRU evaluation, prioritization, and investment decisions.
Stakeholder Engagement: Building Support
Stakeholder engagement is key to building support and
momentum for the West Sac Forward Transit Priority Plan.
WSP will coordinate with groups including the Technical Oversight Group (TOG), Community Advisory Committee
(CAC), Transit Agency Committees (TACs) which include
the YoloTD Citizen Advisory Committee and SacRT Mobility Advisory Council, and Transit Partnership Meetings (TMPs).
Technical Project Approach | WSP
City of West Sacramento | West Sac Forward Transit Priority Plan | 26-043-RFP 90 Page 31 These meetings provide critical touchpoints to collaborate with partners and receive feedback that will inform core plan elements These touchpoints also provide a valuable forum to test materials with a focused audience before broader public outreach. In particular, the CAC and TACs can help ensure information is accessible to their communities and serve as partners in expanding project awareness
Communications: Generating Traction
Strong communications materials are essential for drawing people into civic engagement. We focus on creating clear, attention-grabbing content that quickly explains why their input matters. Our team of communicators, designers,
and videographers produces materials that stand out and make participation approachable, with proven results in increased awareness and engagement.
WSP brought stakeholders together to discuss the technical analysis and transit priority opportunities along the 5600 :FRUULGRULQ6DOW/DNH&LW\3URMHFWSDUWQHUVDQG87$VWD௺ reviewed and assessed which options would move forward to the design phase.
Plan Development Website: Website Content & Collateral
WSP will develop content and graphics to support your project website as a central source for information. The site will include a project overview, timeline, participation opportunities, contact information, and more. Our team can also support web design enhancements, including integrating interactive features such as embedding the online survey directly on the project page to VWUHDPOLQHDFFHVVDQGUHGXFHGURSRႇ
WSP’s graphic designers will work with your team to create clear, visually engaging outreach materials that encourage SDUWLFLSDWLRQ2XWUHDFKWRROVPD\LQFOXGHPHHWLQJÀ\HUV partner toolkits, traditional media, social media, agency and project websites, the City Council newsletter, and physical postings across the city, including at transit stops.
For SMCTA’s US 101 Corridor Multimodal Strategies project, WSP developed posters placed at transit shelters and on poles with QR codes linking riders to project information. These materials helped drive participation in an online mapping survey focused on improving mobility along the corridor. 1RWL¿FDWLRQV0DWHULDOV
WSP’s graphic designers will work with your team to create clear, visually engaging outreach materials that encourage SDUWLFLSDWLRQ2XWUHDFKWRROVPD\LQFOXGHPHHWLQJÀ\HUV partner toolkits, traditional media, social media, agency and project websites, the City Council newsletter, and physical postings across the city, including at transit stops.
For SMCTA’s US 101 Corridor Multimodal Strategies project, WSP developed posters placed at transit shelters and on poles with QR codes linking riders to project information. These materials helped drive participation in an online mapping survey focused on improving mobility along the corridor.
Video thumbnail link created for the Baltimore Red Line project, a new 14-mile high-capacity transit line connecting the city from east to west. The video series featured local community OHDGHUVVSHDNLQJWRWKHVLJQL¿FDQFHRIWKHSURMHFW
Bus stop poster designed for SMCTA encouraging transit
riders to share feedback for the development of a county multi-modal strategy
Videos
WSP provides full-service video production to clearly
communicate project progress and engage audiences.
Our in-house team creates educational videos, visual
updates, and short- and long-form content for web and
social media. We will collaborate with your team to
Technical Project Approach | WSP
City of West Sacramento | West Sac Forward Transit Priority Plan | 26-043-RFP 91 Page 32 develop clear, compelling scripts that highlight the project, explain key improvements, and encourage participation
in open houses, workshops, and surveys. For example,
our “People of the Red Line” campaign for Baltimore
featured real community voices and generated over 30,000 Instagram views in three months, helping build awareness and support among both the public and decision-makers.
Alternative or Optional Community Engagement
Activities
Engagement plans should be adaptive, not prescriptive.
We will work with your team to assess whether current
strategies are meeting engagement goals and metrics
outlined in the PIP and adjust as needed. If a shift is needed, WSP can implement additional approaches, such
as:
Partnering with local CBOs to host focus groups with equity priority communities
Hosting an in-language public meetings to reach nonEnglish-speaking residents Conducting on-board surveys to gather input from
current transit riders
Using paid social media to expand outreach at a low cost Deliverables
9 Draft and Final Public Involvement Plan
9 6WDNHKROGHULGHQWL¿FDWLRQDQGPDLQWDLQHGVWDNHKROGHUOLVW 9 Draft and Final project website content with timely updates 9 Draft and Final TOG and CAC meeting schedules,
agendas, and minutes
9 Draft and Final Title VI reporting and engagement
memoranda (with photos) documenting outreach activities 9 Draft and Final educational video, online survey, and survey analysis report
9 'UDIWDQG)LQDOSXEOLFPHHWLQJPDWHULDOV
À\HUV
announcements, graphics, fact sheets)
9 Draft and Final Outreach and Engagement Technical Report 7DVN൯
7UDQVLW&RUULGRU6WUDWHJLHV
This task translates the data analysis and community input LQWRFRUULGRUVSHFL¿FVWUDWHJLHVWKDWZLOOJXLGHQHDU
and long-term (2050+) transit investments. Task Lead Tim Reynolds will guide an evaluation process that integrates objective data-driven performance metrics, community
priorities, and system-wide goals. By applying a structured evaluation framework, we will identify which corridors are best suited for enhancements such as BRT, LRT, or other transit priority measures. The outcome of this task will be a prioritized roadmap of investments that balances costHႇHFWLYHQHVVHTXLW\DQGVXVWDLQDELOLW\ZKLOHPHHWLQJ:HVW Sacramento’s mobility and growth objectives.
Setting Service Goals and Priorities
%XLOGLQJRQWKHIHHGEDFNUHFHLYHGGXULQJWKH¿UVWSKDVH of community outreach and public engagement activities
and the results of the data analysis, we will collaborate closely with the City, YoloTD, Via, and SacRT to create a set of goals and priorities that are realistic given existing conditions within the City, while providing the opportunity for meaningful service improvements to induce mode
shift towards transit. These goals and policies will provide the necessary direction for the development of the
recommendations later in this task.
The development of the goals and priorities will begin with a workshop, coordinated by WSP, that will bring together VWDႇIURPWKH&LW\<ROR7'9LDDQG6DF573URYLGLQJWKLV opportunity for coordination will ensure buy-in across these agencies, which will be crucial when the recommendations are being developed. Following the workshops, we will
develop a draft memo describing the goals and objectives that will be shared with the meeting attendees for review.
Following this review, we will update the memo accordingly DQGLVVXHD¿QDOYHUVLRQWKDWZLOOJXLGHWKHGHYHORSPHQWRI the rest of this task.
WSP hosted a workshop with stakeholders to develop goals DQGREMHFWLYHVIRUWKH+DZDLL7VXQDPL7UDF3ODQ:H
will conduct a similar exercise with relevant stakeholders to ensure alignment for the development of corridor
improvement strategies
Corridor Evaluation and Prioritization
)ROORZLQJWKHLGHQWL¿FDWLRQRIVHUYLFHJRDOVDQGSULRULWLHV ZHZLOOWDNHWKHFRUULGRUVLGHQWL¿HGLQ7DVNDQG develop a robust, data-driven process to evaluate and
prioritize the corridors and identify future transit investments WKDWZLOOSURYLGHQHDUDQGORQJWHUPEHQH¿WVWRULGHUV Technical Project Approach | WSP
City of West Sacramento | West Sac Forward Transit Priority Plan | 26-043-RFP 92 Page 33 WSP developed an easy to understand evaluation matrix to easily compare corridors and alternatives against a series of evaluation criteria meant to select priority corridors and treatments for the SacRT Capacity Bus Service Study.
We will build upon the data collected as part of Task 2 and feedback from the community and stakeholders from Task
3 to evaluate each corridor based on the following criteria:
Demand Suitability: Projected ridership by corridor
compared to capacity by potential mode.
&RVW%HQH¿W
Capital and operating costs relative to
EHQH¿WVE\SRWHQWLDOPRGH
Environmental Impact: Potential for VMT and GHG
reductions by potential mode.
Travel Time and Reliability: Potential savings for riders by potential mode.
Land Use and Development: Ability to support or
catalyze TOD by potential mode.
Equity:%HQH¿WVWRGLVDGYDQWDJHGDQGWUDQVLW
dependent populations by potential mode.
Integration: Fit with regional services and infrastructure by potential mode. This will include integration with the proposed YoloTD routes from their SRTP.
Risk/Resilience: Long-term viability under uncertainty by potential mode.
Each corridor will be scored based on how well it meets the respective criteria. This will be determined via an objective and data-focused analysis based on the data collected
as part of Task 1 and Task 2. An example of a similarly objective-focused scoring approach from WSP’s work on
the SMCTA’s US 101 North County Multimodal Strategy.
Strategy Development
The results of the corridor evaluation and prioritization will inform the development of short- and long-term investment strategies by corridor to improve existing and future
service. These investments will rank from low (transit
signal priority, queue jumps, etc.) to high (new BRT/LRT service) intervention. Each strategy will be designed to address the unique opportunities and challenges of each corridor and work cohesively to build a coordinated and integrated transit network for the city. The strategies will be evaluated according to its responsiveness to the service JRDOVDQGSULRULWLHVDQGJDSVLGHQWL¿HGLQWKHFRUULGRU evaluation and prioritization.
WSP developed an objective, data-driven approach to
determining how well potential projects met the goals of the 101 Corridor Connect Program. This will be an important element of the West Sac Forward Transit Priority Planevaluating corridors and strategies in a way that is defensible and aligns with the goals of the project.
These recommendations will be tested with the TOG, CAC, and transit agency partners as part of the second phase of community outreach and public engagement to ensure
alignment with community and regional priorities.
:63OHGWKHH௺RUWWRGHYHORS+RXVWRQ0HWUR¶V¿UVWORQJ range transit plan since 2005. Tim Reynolds led the plan to guide major investments strategies over the next 20 years.
Technical Project Approach | WSP
City of West Sacramento | West Sac Forward Transit Priority Plan | 26-043-RFP 93 Page 34 Deliverables
9Goals and priorities workshop (with agenda and meeting notes)
9Draft and Final Goals and Priorities Memo
9Draft and Final Prioritized Corridors and Modes
Evaluation and Technical Report
9Draft and Final Near-Term and Long-Term Transit
Corridor Strategies Report
7DVN൰
)XQGLQJDQG,PSOHPHQWDWLRQ3ODQ
Even the strongest technical recommendations require a
practical roadmap for implementation. This task will identify potential governance structures, funding sources, and
opportunities and challenges to ensure the recommended
corridor strategies developed in Task 4 can be delivered in phases over time. To align corridor needs and strategies ZLWKVSHFL¿FIXQGLQJVRXUFHVDQGPXOWLMXULVGLFWLRQDO
agreements, Task Lead Lauren Tsoi will coordinate with
&LW\VWDႇDQGWUDQVLWSDUWQHUVWRHTXLSWKH&LW\ZLWKDQ actionable playbook for translating vision into reality.
Governance Analysis
Given the impending introduction of LRT service to the
City by SacRT, uncertain future of Via Rideshare, and
proposed changes to the YoloTD network from their SRTP, it’s vital to bring all necessary parties together to develop a governmental framework for the future of transit in
the region. The development of a governance plan that
addresses these potential changes in service delivery,
as well as who will be operating the strategies proposed in Task 4, will ensure the appropriate agencies are
empowered to achieve the City’s transit goals and vision.
A successful governance plan provides:
An operational tool to make leadership decisions.
The framework by which a vision gets translated into
actions.
The practical mechanisms by which West Sacramento
and its partners can allocate authority, responsibility, and accountability.
We have similar experience through our work on the PCTPA COA which involved coordinating with the region’s three transit agencies to identify a set of implementable network coordination strategies, such as developing a Joint Powers Agreement. We will bring a similarly collaborative approach to reviewing governance and institutional considerations across West Sacramento, Yolo County, and Sacramento County.
Topics include multi-jurisdictional agreements, labor and operating responsibilities, and regional governance models.
In coordination with the City, we will identify and describe feasible alternative forms of governance that are available.
We will work with the City, its partners and other champions to develop a governance structure, that coordinates transit operations and maintenance, funding statutes and initiatives within the study area and between adjacent transit service areas and helps identify the City and/or agencies responsible for implementing each project or service recommended as part of the service scenarios. Forming an understanding of the characteristic for each alternative governance structures will enable us to better select the appropriate structure that best aligns with the County’s vision.
Funding Opportunities
)XQGLQJFRQVWUDLQWVDUHDႇHFWLQJDJHQFLHVDQG
organizations of all sizes that provide transit service, and the City and its regional partners are not immune.
As part of the VIA
ART Phase II and III
Prioritization Plan
SURMHFW:63LVSUHSDULQJ
a phasing strategy for
future investment in
Primo and ART service.
This strategy will focus
on short-term and longterm investments based
on corridor demand and
available funding.
Technical Project Approach | WSP
City of West Sacramento | West Sac Forward Transit Priority Plan | 26-043-RFP 94 3DJH Competition exists for available Transportation
Development Act funds between YoloTD to operate
its service the City for Via Rideshare. Limited Local
Transportation Fund amounts means that alternative
IXQGLQJVROXWLRQVQHHGWREHLGHQWL¿HGSDUWLFXODUO\IRUWKH LQYHVWPHQWVLGHQWL¿HGLQ7DVN
We will evaluate federal, state, regional, and local funding programs, identifying:
Competitive grant opportunities (e.g., FTA, state climate programs).
Local funding mechanisms (sales tax, fees, bonds).
,QQRYDWLYH¿QDQFLQJPRGHOV
SXEOLFSULYDWH
partnerships).
A phased strategy will be developed for both constrained and unconstrained funding scenarios to identify short- and long-term funding solutions to address operations and
maintenance and capital improvement sources.
As part of the implementation plan developed for the 101 Corridor Connect Program, WSP performed an analysis of
which funding programs various projects would be eligible for at the federal, state, and local levels.
Opportunities and Challenges
We will assess broader external factors travel demand
XQFHUWDLQW\LQFOXGLQJWKHFRQWLQXHGHႇHFWVRIWKHSDQGHPLF on commute patterns, climate resiliency, fare policy
VKLIWVWKDWFRXOGDႇHFWLPSOHPHQWDWLRQ6WUDWHJLHVZLOOEH LGHQWL¿HGWRPLWLJDWHULVNVDQGDGDSWRYHUWLPH
Deliverables
9Draft and Final Funding and Implementation Strategy
Report
7DVN൱
:HVW6DF)RUZDUG7UDQVLW3ULRULW\3ODQ
7KHGHYHORSPHQWRIWKHGUDIWDQG¿QDOSODQLVZKHUHDOOSULRU tasks are synthesized into a single, cohesive document. This WDVNHQVXUHVWKDWWHFKQLFDODQDO\VHVHQJDJHPHQW¿QGLQJV and implementation strategies are presented in a format that is both comprehensive and accessible. The consultant team will prepare materials that resonate with policymakers, stakeholders, and the general public, while also ensuring compliance with current Web Content Accessibility
Guidelines in line with State Digital Accessibility Laws.
This task will integrate technical analysis, outreach
outcomes, and strategies into a Draft and Final Plan. As the Project Manager, Brad will oversee development of the Draft and Final Plan and will ensure the document is clear, equitable, and actionable.
Fact sheets prepared as part of the Swift Gold Line Scoping Study helped inform project partners and the community about WKHJRDOVEHQH¿WVRXWFRPHVDQGQH[WVWHSVIRUWKH6ZLIW*ROG Line project.
Draft Plan Preparation
The Draft Plan will compile technical reports and
recommendations into a cohesive framework. An Executive Summary will be prepared to provide a high-level overview of the study process and results in a manner that is easily understandable for decision-makers.
Supporting materials will include:
([HFXWLYH6XPPDU\
.H\¿QGLQJVLQDFFHVVLEOHODQJXDJH
Fact Sheet: One-page overview for public distribution. 3XEOLF5HYLHZDQG5H¿QHPHQW
The Draft Plan will be shared with advisory committees, City Council, and the public. Feedback will be documented and incorporated, ensuring transparency.
Technical Project Approach | WSP
City of West Sacramento | West Sac Forward Transit Priority Plan | 26-043-RFP 95 Page 36 )LQDO3ODQDQG1H[W6WHSV
The Final Plan will include a roadmap for near-term and long-term implementation. A “Next Steps” section will specify priority projects, funding pathways, and timelines.
The revised draft plan will be presented in a Final Report that includes an overview of the study process, public input received, results, and recommendations. Each section will FOHDUO\GH¿QHWKHPHWKRGRORJLHVXVHGVRXUFHVFLWHGDQGDQ\ assumptions so that the report is transparent, defensible, and reproducible. Where possible, graphics will be used to convey technical concepts in a more reader-friendly manner. The Final Report will incorporate by reference any stand-alone technical reports and include them as detailed appendices.
All source data will be delivered in native format to West Sacramento for use on future projects.
Deliverables
9Draft and Final West Sac Forward Transit Priority Plan including Executive Summary, Summary of Next Steps (up
to 1; native and PDF formats)
9Fact Sheet (up to 1; native and PDF formats)
7DVN൲
&LW\&RXQFLO5HYLHZ$SSURYDO
Formal adoption by City Council and related commissions UHSUHVHQWVWKH¿QDOVWHSLQVHFXULQJEURDGSROLWLFDODQG community support for the plan. This task ensures that
HOHFWHGRႈFLDOVDQGDGYLVRU\ERGLHVKDYHWKHQHFHVVDU\ PDWHULDOVDQDO\VLVDQGWHFKQLFDODVVLVWDQFHWRFRQ¿GHQWO\ endorse the plan and authorize its implementation. The
consultant team will provide strategic communications
support and technical expertise during the approval process to advance the plan through public and policymaker review..
Preparation of Materials
We will prepare City Council and Commission agenda reports, presentations, meeting minutes, and supporting documents tailored to both technical and non-technical audiences.
Public Meeting Support
The consultant team will attend at least six public meetings, providing technical expertise and highlighting how community input shaped the plan.
Council Approval
The process will conclude with City Council approval of the Final Plan, formally adopting a roadmap for transit investment in West Sacramento.
Deliverables
9City Council Agendas and Agenda Reports
9Transportation, Mobility, and Infrastructure Commission Agendas and Reports
9Presentation Materials
9Meeting Minutes
:63GHYHORSHGDYLVXDOO\DSSHDOLQJHDV\WRXQGHUVWDQG¿QDOUHSRUWIRUWKH9LVLRQ SURMHFWZKLFKZDVWKHUHFLSLHQWRIWKH
2026 APA Northern California Planning Excellence Award. We will bring the same award-winning approach to the development RIWKH¿QDO:HVW6DF)RUZDUG7UDQVLW3ULRULW\3ODQ
Technical Project Approach | WSP
City of West Sacramento | West Sac Forward Transit Priority Plan | 26-043-RFP 96 Page 37
WSP USA
Contract Number – West Sac Forward Transit Priority Plan Expires on June 30, 2028
EXHIBIT B
Schedule of Performance
Contract Start Date August 20, 2026
Contract End Date June 30, 2028
97 PROJECT SCHEDULE 2026 2027 2028
TASK AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC JAN
PROJECT
ADMINISTRATION
Project Management PlanMeetings
01 DATA
COLLECTION
Transit Operations Data Collection7UDႈF,QIUDVWUXFWXUH'DWD&ROOHFWLRQTransit and Road Infrastructure Data CollectionTravel Behavior Data CollectionLand Use and Planning Data Collection 02 MARKET CONDITIONS &
SERVICE ANALYSIS
Analysis of Existing Transit Market ConditionsTravel Pattern AnalysisRegional & Local Transit Services'HYHORS&RUULGRU3UR¿OHVTransit Technology and Best Practices 03 COMMUNITY OUTREACH
& PUBLIC ENGAGEMENT
Public Involvement PlanPlan Development WebsiteTechnical Oversight Group (TOG)Community Advisory Committee (CAC)YoloTD Citizen Advisory Committee/SacRT Mobility Advisory CouncilCommunity & Transit Rider SurveysTransportation/Transit Partnership MeetingsPublic Engagement Open HousesIn-Person and Virtual (Online) WorkshopsIn-Person Pop-Up Transit EventsAlternative or Optional Community Engagement Activities 04 TRANSIT CORRIDOR
STRATEGIES
Set Service Goals and PrioritiesCorridor Evaluation and Prioritization FUNDING &
IMPLEMENTATION PLAN
Governance AnalysisFunding OpportunitiesOpportunities and Challenges 06 WEST SAC FORWARD
TRANSIT PRIORITY PLAN
Draft and Final PlanSummary of Next Steps
07 CITY COUNCIL REVIEW/
APPROVAL
City Council Review/Approval
City of West Sacramento | West Sac Forward Transit Priority Plan | 26-043-RFP 98 Page 22
WSP USA
Contract Number – West Sac Forward Transit Priority Plan Expires on June 30, 2028
EXHIBIT C
Schedule of Fees
99 100
101
102
103
WSP USA
Contract Number – West Sac Forward Transit Priority Plan Expires on June 30, 2028
EXHIBIT D
CERTIFICATE OF COMPLIANCE WITH LABOR CODE § 3700
[Labor Code § 1861]
I am aware of the provisions of Section 3700 of the Labor Code which require every employer to be insured against liability for workers’ compensation or to undertake self-insurance in accordance with the provisions of that code, and I will comply with such provisions before commencing the performance of the work of this contract.
CONSULTANTS
By:
Title: _______________________________
104
CITY COUNCIL AGENDA REPORT
MEETING DATE: August 19, 2026 ITEM # 7
SUBJECT:
CONSIDERATION OF A PREFFERED VENDOR LIST FOR
ON-CALL PROFESSIONAL GRAPHIC DESIGN, PRINTING, AND MAILING SERVICES INITIATED OR REQUESTED BY: REPORT COORDINATED OR PREPARED BY:
[ ] Council [X] Staff
[ ] Other
Susan Strand, Senior Analyst
Community Development Department
ATTACHMENT [X] Yes [ ] No [ ] Information [ ] Direction [X] Action
OBJECTIVE
The purpose of this report is to provide City Council with the information necessary to consider and approve the proposed preferred vendor list for on-call professional graphic design, printing, and mailing services.
RECOMMENDED ACTION
Staff respectfully recommend that the City Council:
1. Approve the proposed preferred vendor list for on-call professional graphic design, printing, and mailing services for a period of three (3) years, with an option for two (2) one-year extensions;
2. Authorize the City Manager or their designee to execute contracts with each service provider and undertake any and all actions necessary to implement the contracts;
3. Authorize the City Manager or their designee to execute non-substantive changes and modifications, with approval from the City Attorney; and
4. Authorize the City Manager or their designee to extend the contract term and adjust compensation within the limits of the Council-approved budget as needed.
BACKGROUND
The City of West Sacramento has an ongoing objective to provide the community with accurate and professionally presented information about City projects, programs, services, and municipal requirements. To create effective outreach materials, the City frequently utilizes the professional services of graphic design, printing, and mailing service vendors. Because the need to utilize such services is common among City Departments, a universal approach for identifying and selecting qualified vendors is desirable to ensure the consistent quality of City outreach materials and eliminate duplicative efforts to identify qualified vendors.
ANALYSIS
To address its ongoing outreach needs, on May 26, 2026, the City released a Request for Qualifications (RFQ) for On-Call Graphic Design, Printing, and Mailing Services (26-054-RFQ). The City received five (5) responses to the RFQ. A committee comprised of six (6) staff members representing the Community Development and Economic Development and Housing Departments, as well as the City Manager’s Public Information Office, was formed to evaluate the responses.
After each committee member submitted individual evaluation scores, the four (4) highest-scoring vendors moved forward in the selection process for interviews. The following three (3) vendors have been selected by staff to move forward on the preferred vendor list, listed alphabetically:
1. Commerce Printing Services
2. Four Waters Media, Inc.
3. We The Creative
105
On-Call Graphic Design, Print And Mailing Services Vendor List August 19, 2026
As each City Department has unique needs and outreach budgets for graphic design, printing, and mailing services, the financial components of any future graphic design contracts resulting from use of this preferred vendor list will be considered on a case-by-case basis per the City’s standard procurement protocols.
Environmental Considerations
The City included Environmentally Preferable Purchasing (Administrative Policy IV-B-7) specifications in the RFQ and included sustainable business practices in the RFQ evaluation criteria.
This action is not a Project subject to the California Environmental Quality Act (CEQA) because it is not an activity that may cause either a direct or reasonably foreseeable indirect physical change in the environment. (Pub.
Resources Code, § 21065; CEQA Guidelines §§ 15060(c), 15378(a).) Commission Recommendation
Not applicable.
Strategic Plan Integration
Not applicable.
Alternatives
The Council’s primary alternatives include:
1. Deferring approval and requesting that staff return to the Council with additional information at a later date; or
2. Declining to approve the proposed On-Call Graphic Design, Printing, and Mailing Services preferred vendor list.
Staff do not recommend these alternatives as we believe the proposed preferred vendor list is fair and equitable and consists of qualified vendors who are equipped to provide the City with exceptional graphic design, printing, and mailing services.
Coordination and Review
Staff coordinated with the Finance Department and used established City procurement protocols to create the proposed preferred vendor list.
Budget/Cost Impact
There is no cost associated with approving the on-call list. Costs for utilizing the contracts once in place will be charged to the appropriate cost center or project budget approved by Council for this purpose.
ATTACHMENT
1. Proposed On-Call Graphic Design, Printing, and Mailing Services Preferred Vendor List 106
ATTACHMENT 1 - PREFERRED VENDOR LIST
ON-CALL PROFESSIONAL GRAPHIC DESIGN, PRINTING, AND MAILING SERVICES Project ID: 26-054-RFQ
August 19, 2026
Preferred Vendors Evaluator Recommendations & Vendor
Highlights
Commerce Printing Services
CommercePrinting.com
322 N 12th Street
Sacramento CA 95811
(916) 442-8100
Contacts:
Kellie Melby
[email protected]
Marissa Mayfield
[email protected]
Best vendor for print and mailing services.
• Print in-house locally, using environmentally
sustainable practices and union workers.
• Offer graphic design services when print services
are used.
• Can provide suggestions for improving outreach
success and printing project cost savings.
• Long history of working with the City to create
outreach materials.
• Familiar with and use the City’s Style Guide for
outreach design.
Four Waters Media, Inc.
FourWatersMedia.com
813 Harbor Boulevard, Suite 205
West Sacramento, CA 95691
(916) 769-7399
Contacts:
Denise Van Hill, Executive Director
[email protected]
Leslie Green
[email protected]
Best vendor for designing locally produced
and targeted outreach materials.
• Based in West Sacramento. Extremely familiar
with the community and local politics.
• Can provide suggestions for improving outreach
success and ensuring materials reach the
targeted demographic.
• Uses a print broker to match project needs.
Willing to use a City-preferred printing vendor
given their print capabilities match the project
specifications.
• Able to provide language translation services for
outreach materials.
We The Creative
WeTheCreative.com
3349 Michelson Drive, Suite 200
Irvine, CA 92612
(877) 887-1318
Contacts:
Joven Orozco
[email protected]
Best for innovative attention-grabbing
graphic design.
• Provided several examples of innovative and
original graphic design work in their proposal.
• Described their unique process for working with
clients to create successful outreach materials
that increase community response and
participation.
• Use a broker for printing services and willing to
work with a City-selected printing vendor given the
printer capabilities match the project
specifications.
• Able to provide language translation services for
outreach materials.
107
CITY COUNCIL AGENDA REPORT
MEETING DATE: August 19, 2026 ITEM # 8
SUBJECT:
CONSIDERATION OF RESOLUTION 26-68 ACCEPTING PUBLIC IMPROVEMENTS FOR NEWPORT ESTATES UNIT 13 (SUBDIVISION NO. 5142)
INITIATED OR REQUESTED BY: REPORT COORDINATED OR PREPARED BY:
[ ] Council [X] Staff
[ ] Other
Candido Ramirez, Senior Civil Engineer
Community Development Department
ATTACHMENT [X] Yes [ ] No [ ] Information [ ] Direction [X] Action
OBJECTIVE
The objective of this report is to provide the City Council with the information necessary to accept public improvements within Newport Estates Unit 13 (Subdivision No. 5142).
RECOMMENDED ACTION
Staff respectfully recommends that the City Council adopt Resolution 26-68 accepting public improvements within Newport Estates Unit 13 (Subdivision No. 5142) including water, sewer, storm drain, streetlight, and roadway improvements, Community Facilities District (CFD) landscaping, and irrigation. This acceptance would exclude street trees.
BACKGROUND
On June 18, 2025, the City Council passed Resolution 25-51, approving a final map for Subdivision No. 5142, Newport Estates Unit 13. The final map was recorded with the Yolo County Recorder’s office on August 11, 2025. At the time of map approval, the City and the subdivision developer entered into a Subdivision Improvement Agreement (SIA) to ensure the satisfactory completion of all public improvements.
This item contemplates acceptance of certain eligible public improvements, including water, sewer, storm drain, streetlight, and roadway improvements, landscaping, and irrigation (Required Improvement items 1a and 1b of the SIA). The subdivision developer has provided a one-year warranty bond effective upon acceptance of these improvements.
Street tree improvements associated with Newport Estates Unit 13 (Required Improvement item 1c of the SIA), have not been completed and are not eligible for acceptance at this time.
ANALYSIS
All improvements under consideration have been completed to the satisfaction of the appropriate City staff in accordance with the SIA and City standards. The subdivision developer has requested that the City Council accept said improvements and has submitted the required warranty securities.
The West Sacramento Area Flood Control Agency (WSAFCA)’s Southport Levee Drainage Improvement Project (SLDIP) included a system to collect surface runoff from the levee and seepage berm areas. That runoff will be conveyed through the public improvements for Newport Units 12 and 13, which were upsized to accommodate additional runoff. The improvements accepted by way of the attached resolution include storm drain pipe for the project described above.
Environmental Considerations
The Planning Commission found that the Tentative Map for Newport Unit 13 was within the scope of the Environmental Impact Report (EIR) prepared for the West Sacramento General Plan, and no new significant or adverse impacts would occur through implementation of the proposed project. No new environmental document is required consistent with Sections 15162 and 15168(C)(2) of the California Environmental Quality Act (CEQA) Guidelines.
Commission Recommendation
Not applicable.
Strategic Plan Integration
Not applicable.
108
Newport Estates Unit 13
August 19, 2026
Alternatives
Once the required water, sewer, storm drain, and roadway improvements are satisfactorily completed, the City must accept the improvements per the Subdivision Map Act.
Coordination and Review
The Engineering Inspector has inspected and approved the public improvements proposed for acceptance. The required improvements have been completed to the satisfaction of the City Engineer and the Community Development Department. Pending reimbursement for drainage improvements has been coordinated with the Finance Department.
Budget/Cost Impact
The estimated value of the public improvements to be accepted, including water, sewer, storm drain, lighting, and roadway improvements, is $3,017,338.74. In accordance with Section 10.b of the SIA, the subdivision developer has submitted a Warranty Security bond in the amount of $301,734. A Landscape and Irrigation Warranty Security bond in the amount of $15,506 has also been submitted. The Payment Security bond will remain with the City until the timeframe prescribed in Section 11.b of the SIA. The Performance Security bond will be released to the subdivision developer in accordance with Section 11.c of the SIA.
On January 20, 2020, the City and the subdivision developer entered into a Development Reimbursement Agreement (DRA) to compensate the subdivision developer for upsizing drainage improvements (Attachment 3).
DRA Item 3 indicates that WSAFCA is to deposit the appropriate amount into a City holding account once the agreement is executed. Exhibit A of the DRA shows reimbursement amounts for Newport Units 12 and 13. The City will reimburse the subdivision developer for a total of $145,279.28 for the drainage improvements.
ATTACHMENTS
1. Resolution 26-68
2. Vicinity Map
3. WSFCA DRA
109
Attachment 1
RESOLUTION 26-68
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF WEST SACRAMENTO
ACCEPTING THE MAJORITY OF PUBLIC IMPROVEMENTS FOR NEWPORT ESTATES UNIT 13 (SUBDIVISION NO. 5142)
WHEREAS on June 18, 2025, the City Council of the City of West Sacramento adopted Resolution 25-51 approving the Final Map, Subdivision Improvement Agreement, and Development Reimbursement Agreement for Newport Estates Unit 13 (Subdivision No. 5142); and
WHEREAS the Subdivision Improvement Agreement recorded with the Final Map required the completion of certain public improvements including landscaping and street trees; and
WHEREAS City staff has determined that the required water, sewer, storm drain, street light, roadway, landscape, and irrigation improvements listed in the Subdivision Improvement Agreement as Required Improvements 1a and 1b have been completed in accordance with the City’s Standard Specifications and Details and other provisions of the Subdivision Improvement Agreement; and
WHEREAS the subdivision developer has submitted the required Warranty Securities as outlined in the Subdivision Improvement Agreement to guarantee the work for the one-year warranty period; and
WHEREAS the street trees in front of the subdivision lots (Required Improvement 1c) are not covered by this Resolution,
NOW, THEREFORE, BE IT RESOLVED AND ORDERED that the City Council of the City of West Sacramento hereby accepts the completed public improvements described above within Newport Estates Unit 13, constructed in accordance with the Subdivision Improvement Agreement and City standards, and releases the appropriate Performance Securities posted with the Subdivision Improvement Agreement.
PASSED AND ADOPTED at a regular meeting of the City Council of the City of West Sacramento on this 19th day of August 2026, by the following vote:
AYES:
NOES:
ABSENT:
ATTEST:
Martha Guerrero, Mayor
Jennifer Cusmir, City Clerk
110
SANSOME ST
BERRY CREEK RD
DEL MAR CT
CORANADO ST
PORTOLA ST
HEARST ST
RIVA DR
SAN MARCO ST
MALIBU CT
GOLD HILL ST
MARINA GREENS DR
NAUTICA CT
NEPTUNE CT
FONTANA ST
COLUMBUS RD
ALTURAS CT
CORTINA RD
LA JOLLA ST
FILLMORE PL
HIGHLAND DR
LOCKS DR
GRANT CT
GEARY ST
MILANO DR
POMO CT
SPOONBILL RD
COLUSA RD
APACHE ST
CRESTED ST
MOJAVE DR
HOOPA RD
CLOVERDALE RD
SIERRA RD
WHITNEY PL
SHASTA WAY
WIGEON ST
RUMSEY PL
BLACKFOOT RD
HOPLAND ST
YUROK PL
BENTON ST
PEPPERTREE RD
RUBICON WAY
CEDAR CT
GREENBRIER RD
MOONFLOWER ST
SIERRA RD
CHINOOK RD
SPRUCE WAY
CASCADE ST
BAYBERRY ST
SOUTH RIVER RD
CARMEL CT
LIMEWOOD RD
ELDERBERRY ST
BLUE ROCK ST
ASANTE LN
PRINCETON RD
ORINDA PL
BASTONE CT
ALAMO PL
BIRCH AVE
ALDER WAY
LEMONTREE RD
IRONWOOD WAY
LINDEN RD
CHELAN RD
VILLAGE PKWY
CROWN AVE
LINDEN RD
RAIDER LN
DIABLO ST
BIRMINGHAM AVE
STONE CT
LAKE WASHINGTON BLVD
TOWN CENTER PLZ
STETSON CIR
BRISBANE ST
THORP RD
KINSINGTON ST
ASTER AVE
JEFFERSON BLVD
LAKE WASHINGTON BLVD ARLINGTON RD
ROGUE RIVER CIR ALABAMA CT
MOJAVE DR
West Sacramento Parcel Map
City of West Sacramento, Yolo County, Maxar
Centerline
5/13/2025, 8:01:41 AM
0 500 1,000 2,000 ft
0 200 400 800 m
1:18,056
West Sacramento Staff
This map was generated using the City of West Sacramento Parcel viewer. Information is accurate as of the time it was printed and should be used for reference purposes only. 111
112
113
114
115
116
117
CITY COUNCIL AGENDA REPORT
MEETING DATE: August 19, 2026 ITEM # 9
SUBJECT:
CONSIDERATION OF RESOLUTION 26-79 AUTHORIZING APPLICATIONS FOR GRANT FUNDING FROM THE SACRAMENTO AREA COUNCIL OF GOVERNMENTS 2026
FEDERAL FUNDING CYCLE PROGRAMS
INITIATED OR REQUESTED BY: REPORT COORDINATED OR PREPARED BY:
[ ] Council [X] Staff
[ ] Other
Stephanie Chhan, Senior Transportation Planner
Community Development Department
Christian Asuncion, Senior Engineer
Capital Projects Department
ATTACHMENT [X] Yes [ ] No [ ] Information [ ] Direction [X] Action
OBJECTIVE
The objective of this report is to provide the City Council with sufficient information to adopt Resolution 26-79 authorizing applications for and, if successful, acceptance of grant funding from the Sacramento Area Council of Governments (SACOG) 2026 Federal Funding Cycle Programs..
RECOMMENDED ACTION
Staff respectfully recommend that the City Council adopt Resolution 26-79:
1) Authorizing applications for grant funding through the SACOG 2026 Federal Funding Cycle Programs; 2) Approving the City’s SACOG 2026 Federal Funding Cycle Programs application priorities; 3) Authorizing City staff to make non-substantive changes or modifications to the Federal Funding Cycle Program application priorities, with approval from City Manager; and 4) Authorizing the City Manager or their designee to execute all required grant documents and ensure timely project delivery.
BACKGROUND
SACOG administers several competitive federal funding programs intended to support regional goals around system preservation, congestion management, active transportation, and multimodal connectivity. As part of the 2026 Federal Funding Cycle, City staff submitted an application in response to the SACOG System Preservation Program call for projects in May 2026 for the Harbor Boulevard System Preservation Project (Resolution 26-37).
In June 2026, SACOG released the call for projects for the other two programs: System Performance and Next Generation Solutions & Clean Air.
For the first time, the 2026 funding cycle includes all six counties in the SACOG region – El Dorado, Placer, Sacramento, Sutter, Yolo, and Yuba – marking a more comprehensive, region-wide approach. These programs prioritize investments that maintain critical transportation infrastructure, improve safety, and enhance mobility across the region. These programs distribute federal funds from sources such as the Surface Transportation Block Grant (STBG) and Congestion Mitigation and Air Quality (CMAQ) programs, providing local jurisdictions with opportunities to advance priority capital projects. There are approximately $203 million in funding available in the 2026 Federal Funding Cycle Programs for Federal Fiscal Years 2028 through 2030.
Participation in the 2026 funding cycle allows the City to compete for resources that support long-term infrastructure needs, reduce reliance on local funding sources, and accelerate delivery of shovel-ready improvements. Projects eligible for this funding include roadway rehabilitation, complete streets enhancements, active transportation facilities, and multimodal connectivity investments, all of which align with the City’s transportation, safety, and sustainability goals. Securing SACOG funding also ensures that regional priorities are consistent with local plans, such as the Bicycle, Pedestrian, and Trails Master Plan and the City’s Capital Improvement Program (CIP).
Submitting a prioritized list of City projects and authorizing the execution of grant-related documents positions the City to remain competitive during the application process and meet all federal funding requirements. If awarded, SACOG funds would help advance high-impact capital projects, improve community mobility and safety, and support the City’s commitment to maintaining a resilient and efficient transportation network. 118
Resolution 26-79 - SACOG Federal Funding Cycle
August 19, 2026
ANALYSIS
Staff seek the City Council’s authorization to submit a final application package to SACOG for the System Performance Program and the Next Generation Solutions & Clean Air Program.
The System Performance Program is designed to advance projects that improve the performance, safety, reliability, and efficiency of the existing regional transportation network. The program supports a wide range of investments in roadway, transit, and multimodal infrastructure that address operational deficiencies, congestion, goods movement, and safety needs. Staff propose to submit application(s) for the Southport to Harbor Roadway Project (CIP-15046).
The Next Generation Solutions & Clean Air Program is designed to foster the next generation of mobility solutions, including implementation of SACOG initiatives such as the Regional Transit Network Study and Regional Trails Network, as well as funding active transportation projects, zero-emission vehicle (ZEV) implementation, Complete Streets projects, other infrastructure for high-capacity transit, streetscape corridors, and other projects that have air quality or multimodal benefits. Staff propose to submit application(s) for the Clarksburg Branch Line Trail (CIP-11039).
Staff are underway with grant application development and may segment these projects into multiple applications for implementation purposes.
Environmental Considerations
The current action is not subject to CEQA because it is not an activity that may cause either a direct or reasonably foreseeable indirect physical change in the environment. (Pub. Resources Code, § 21065; CEQA Guidelines §§ 15060(c), 15378(a).)
Commission Recommendation
Not applicable.
Strategic Plan Integration
These projects advance “Mobility & Connectivity,” in support of providing convenient and sustainable choices for people to get where they are going; “Inclusive and Diverse,” in support of equitable investment and social/environmental justice in the City; “Climate and Energy Resiliency,” in support of reducing climate impact by providing resiliency in the transportation network; and “Core Services and Infrastructure” in support of sustaining a financially sound city in which everyone feels safe and secure, with quality services and wellmaintained infrastructure. Clarksburg Trail Enhancements were part of the 2025 Strategic Priorities Policy Agenda.
Alternatives
The City Council may choose among the following alternatives:
1) Approve the recommended actions as stated above.
2) Amend the recommended actions.
3) Decline to approve the recommended actions or cancel the project(s).
Staff recommend Alternative 1 to apply for grant funding. Alternatives 2 and 3 are not recommended because City Staff would not be eligible to apply for grant funding. Applications are due September 18, 2026. City staff have aligned proposed applications to advance implementation of existing CIP projects. Staff will not have sufficient time to prepare applications for new or different projects in this grant cycle.
Coordination and Review
This report was prepared by the Community Development Department in coordination with the Capital Projects Department.
Budget/Cost Impact
The applications are projects included in the City’s current CIP. The Southport to Harbor Roadway Project is part of CIP-15046. The Clarksburg Branch Line Trail Project is part of CIP-11039.
Award of funding from SACOG’s Federal Funding Cycle requires the City to provide an 11.47 percent non-federal match. Staff will work with the Finance Department to determine the source of local funds upon receipt of award determination from SACOG.
119
Resolution 26-79 - SACOG Federal Funding Cycle
August 19, 2026
ATTACHMENTS
1) Vicinity Map of Proposed Federal Funding Cycle Program Applications 2) Resolution 26-79
120
Southport to Harbor Roadway Project Location Map
Attachment 1
121
122
Attachment 2
RESOLUTION 26-79
RESOLUTION OF THE CITY COUNCIL OF THE CITY OF WEST SACRAMENTO
AUTHORIZING APPLICATIONS FOR GRANT FUNDING FROM THE SACRAMENTO AREA COUNCIL OF GOVERNMENTS 2026 FEDERAL FUNDING PROGRAMS; AUTHORIZING
THE CAPITAL PROJECTS AND COMMUNITY DEVELOPMENT DEPARTMENTS TO SUBMIT THE CITY OF WEST SACRAMENTO SACOG 2026 FEDERAL FUNDING PROGRAM APPLICATION PRIORITIES; AND AUTHORIZING THE CITY MANAGER, OR
THEIR DESIGNEE, TO EXECUTE ALL GRANT DOCUMENTS AND TIMELY PROJECT
DELIVERY REQUIREMENTS
WHEREAS the Sacramento Area Council of Governments (SACOG) has announced three 2026 Federal Funding Cycle Programs (Funding Programs), which are open to sponsoring agencies within the six-county SACOG region: System Preservation, System Performance, and Next Generation Solutions & Clean Air; and
WHEREAS the System Preservation Program invests in maintaining and resurfacing major roadways that facilitate the movement of people and goods; and WHEREAS the System Performance Program funds projects that improve the daily functions of the regional transportation network, including roadway and safety improvements, transit upgrades, electric vehicle (EV) charging, new bicycle and pedestrian connections, mobility hubs, and smart transportation technologies that help manage traffic and improve reliability; and WHEREAS the Next Generation Solutions & Clean Air Program supports projects that reduce emissions and improve air quality, such as high-capacity transit, zero-emission vehicles and charging infrastructure, bikeways and trails, Complete Streets, traffic flow improvements, and programs that encourage carpooling, transit use, and other clean transportation options; and WHEREAS eligible projects for Funding Programs must be listed in the 2025 Blueprint or fit within 2025 Blueprint lump-sum project categories including, but not limited to, road maintenance and reconstruction, transit vehicle replacements, operational improvements, Intelligent Transportation Systems, and bicycle and pedestrian investments; and WHEREAS SACOG limits Funding Programs grant applications to no more than three per sponsoring agency for any one of the three different Funding Programs, up to a maximum of nine total applications per sponsoring agency; and
WHEREAS applicants shall affirm their commitment to delivering projects in accordance with the requirements of the Surface Transportation Block Grant (STBG) Program and Congestion Mitigation & Air Quality (CMAQ) Improvement Program, as applicable; and WHEREAS grant proposals for construction work shall obligate Funding Program dollars for construction activities no later than the end of federal fiscal year 2028-29; and WHEREAS SACOG will not provide additional federal or state funding in the event that cost overruns are identified; and
WHEREAS project sponsors shall commit to providing local matching dollars, typically
11.47 percent of the total project cost; and
WHEREAS SACOG requires that, if awarded federal funds by the SACOG Board, City of West Sacramento (City) staff responsible for project delivery must attend quarterly project delivery meetings with SACOG staff to receive assistance until project closeout, NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of West Sacramento as follows:
123
Resolution 26-79