2700 South Grand Avenue | Santa Ana, CA 92705 Ph: 7 14-546-3468 www.labellemarvin.com Cali
fornia Company Since 1969
Cook Off, (Emulsion)
2 @ $2
00  $400.00
Reflux Extraction, (RAP Aggregate)
1 @ $280  $280.00
Solvent Surcharge, (RAP Aggregate)
1 @ $110  $110.00
Gradation, (RAP Aggregate)
1 @ $130  $130.00
W.T.A.T.
54 @ $145  $7,830.00
Mileage
2090 @ $0.80  $1,672.00
Field and Lab Testing Budget  $64,242.00
Office Support
Report Preparation/Typing
10 Hours @ $110  $1,100.00
Principal Engineer
5 Hours @ $285  $1,425.00
Office Support Budget   $2,525.00
Total Suggested Material Testing Services          $66,767.00 The above Construction Inspection budget is a good‐faith estimate based on the anticipated scope  of  work  scheduled  for  2026.  Actual  costs  will  be  dependent  upon  the  contractor’s schedule  and  efficiency  in  completing  the  project.  Should  additional  inspection  days  be required due to extended sealing operations, a change order request shall be sub mitted  to the  City  for  approval.  Additional  services  shall  be  billed  on  a  Time  and  Materials  basis  in accordance with LaBelle‐Marvin, Inc.’s current Schedule of Fees.

Laboratory testing for retained (hold) samples, if required, is not included in this estimate and will be billed for actual services performed at the applicable rate s under our Schedule of Fees.

The opportunity to submit this proposal is sincerely appreciated. Please contact our office with any questions or requests for clarification.

Sincere
ly,
Griffin R. Marvin
Director of Operations
805

1 Jenner, Suite 160, Irvine, CA 92618
626.224.2055
February 2 , 202 6
Cameron Luna, Associate Engineer
City of Wildomar
23873 Clinton Keith Road , Suite 201
Wildomar, CA 92595

Re: Letter Proposal for Construction Management, and Inspection Services for the Bundy Canyon Road Rehab Project (CIP 057 -3) and Slurry Seal Project (CIP 058 -3)

Dear Mr. Luna ,
We are pleased to present this L etter proposal to the City of Wildomar (City) for the Construction Management and Inspection Services for the Bundy Canyon Road Rehab Project (CIP 057 -3) and Slurry Seal Project (CIP 058- 3) (Projects ). Per your email, dated January 15 202 6, we understand that the City is requesting a cost proposal to provide Construction Management and Inspection services for these projects.

PROJECT UNDERSTANDING
Based on the email dated January 15, 2026, we understand the Project entails: Removal of existing asphalt concrete pavement, AC repairs to 3” total depth, Construct 6" AC Dike, Perform Crack Seal, Asphalt surfacing, ARHM surfacing, Type I and Type Il PME -RAP Slurry, Reinstall pavement markings, striping, signage and traffic loops, Adjust utility manholes and valves to grade, Construct 6' Wide Swale, Traffic Control, Construction Survey, and all items not mentioned but indicated in the Plans, Specifications, and the Technical Specifications within the Contract Documents.

Furthermore, we understand that the project construction duration is estimated at 50 Working Days (WD’s) with pre-con Phase around 10 WD’s, and Post-Con Phase around 20 WD’s.

806
THOUGHTFUL SOLUTIONS . THRIVING COMMUNITIES .

Bundy Canyon Road Rehab Project and Slurry Seal Project Page | 2

SCOPE OF WORK
Based on the proposal request for Construction Management and Inspection services our scope of work will consist of:

Pre-Construction/Construction Phase
 Set-up and facilitate City/CM&I/Geotech/EOR
pre-con team meeting.
 Facilitate Pre-Construction Meeting with
Agenda and compile notes.
 Meet and confer with City on any issues prior
to NTP.
 Complete Pre-walk photo documentation.
 Set-up Project files/folders per City
requirements for Construction
 Review all Submittals in coordination with
the City and EOR.
 Complete Daily Inspections with Reports and
Photos.
 Facilitate and attend weekly meetings with
notes.
 Track schedule and payment progress.
 Review updated schedules.
 Coordinate the material and special
inspection testing work with City’s material
testing firm if desired.
 Complete WSWD’s.
 Inspect the Site for compliance with plans and
specifications.
 Assist with on-going public notices and updates.
 Complete all file management duties.
 Assist the City with WCD, Change Orders, PCO’s, and
track with a PCO log.
 Measure and provide Progress Payment quantities
and Progress Payments for City.
 Meet and Discuss Issues with City.
 Complete QA for all documents related to
construction.
 Review and respond to all RFI’s and track with RFI log.  Resolve all disputes with Contractor in coordination
with the City.
 Assist with Labor Compliance and CPR review with
City or City’s sub-consulting firm.
 Complete BMP and SWPPP inspections.
 Additional Duties as assigned.
 Maintain weekly as built updates of work completed
per week per the City’s direction

Post-Construction Phase
 Complete Final Acceptance Documents and
provide to City for processing NOC.
 Complete red-lines for As-builts and provide
to City/EOR for record drawings.
 Complete Final Report.
 Assist City with potential claims, if needed.
 Assist with funding close-out requirements.
 Additional duties as assigned.
 Complete close-out documentation.
 Assist with Final Labor Compliance Folder.

807
THOUGHTFUL SOLUTIONS . THRIVING COMMUNITIES .

Bundy Canyon Road Rehab Project and Slurry Seal Project Page | 3

FEE SCHEDULE
Based on the request for proposal scope of work and estimated working days for Construction Management and Inspection services our Fee for a Not-To -Exceed Estimate amount is shown in the table below:

Task Position
(See Note 1)
Rates
(*Prevailing
Wage)

Estimated
Working
Days
Estimated
Total
Hours
(Including
Pre /Post -
Con)
Total
Pre/ Construction
Phase /Close Out
Ali Luedtke
Supervising Public
Works Observer
*$165 50 400 $66,000
Henry Ngo, PE
Construction
Services Manager
$158.15 50 200 $31,630
Total: $97,630
Notes:
1 – Additional Interwest staff may be used for coverage /backup during the project and remain within the NTE.

Furthermore, we appreciate the opportunity to submit this amendment proposal to the City of Wildomar. Please contact Scott Harrison , CPRP at 407.739.4805 or sharrison @interwestgrp.com should you have any questions. If you find our proposal acceptable, please provide a signed notice -to-proceed letter.

Sincerely,

William Evans , Senior Director of Professional Services Interwest Consulting Group

808

ATTACHMENT G

UPDATED PROJECT DETAIL SHEETS
(continues on next page)
809

CITY OF WILDOMAR

CAPITAL IMPROVEMENT PROGRAM PROJECT DETAIL SHEET
FY 25/26 to FY 29/30
PROJECT TITLE: CIP NO.: DEPT: Public Works
LOCATION: CATEGORY: MANAGER: Cameron Luna
INITIATED: FY 18/19
FY 25/26 FY 26/27 FY 27/28 FY 28/29 FY 29/30 &
Future Years
Project Dev/Environ. - $ - $ - $ - $ - $ - $
Design/PS&E 325,000 65,000 65,000 65,000 65,000 65,000 Right-of-Way - - - - - -
Construction 7,862,600 2,862,600 1,250,000 1,250,000 1,250,000 1,250,000 Const Admin/Inspect. 675,000 275,000 100,000 100,000 100,000 100,000 Total Cost: $ 8,862,000 $ 3,202,600 1,415,000$ 1,415,000$ 1,415,000$ 1,415,000$

FUNDING SOURCES
201 - Measure A $ 882,600 $ 222,600 165,000$ 165,000$ 165,000$ 165,000$ 501 - RMRA (SB1) 6,480,000 2,480,000 1,000,000 1,000,000 1,000,000 1,000,000 120 - Measure AA 1,500,000 500,000 250,000 250,000 250,000 250,000 - - - - - -
- - - - - -

PROJECT DESCRIPTION AND EXHIBIT
Annual Pavement Rehabilitation Program:

This program provides for the rehabilitation of selected streets based on the City Pavement Management Report, Maintenance Records, and Citizen Input.

PROJECT

PHASE/TASK
TOTAL 5-
YEAR

PROJECT

PROJECTED BUDGETPROPOSED BUDGET

PROJECT SUMMARY
Pavement Rehabilitation Program 057
Citywide Trans. (Maint.)

PRE-REHAB
WILDOMAR TRAIL REHAB (CIP 057 - SUMMER 2020)

POST-REHAB

Page 22 of 72 ends

02.10.26 810

CITY OF WILDOMAR

CAPITAL IMPROVEMENT PROGRAM PROJECT DETAIL SHEET
FY 25/26 to FY 29/30
PROJECT TITLE: CIP NO.: DEPT: Public Works
LOCATION: CATEGORY: MANAGER: Cameron Luna
INITIATED: FY 18/19
FY 25/26 FY 26/27 FY 27/28 FY 28/29 FY 29/30 &
Future Years
Project Dev/Environ. - $ - $ - $ - $ - $ - $
Design/PS&E 325,000 65,000 65,000 65,000 65,000 65,000 Right-of-Way - - - - - -
Construction 7,730,000 2,730,000 1,250,000 1,250,000 1,250,000 1,250,000 Const Admin/Inspect. 500,000 100,000 100,000 100,000 100,000 100,000 Total Cost: 8,555,000$ 2,895,000$ 1,415,000$ 1,415,000$ 1,415,000$ 1,415,000$

FUNDING SOURCES
201 - Measure A 825,000$ 165,000$ 165,000$ 165,000$ 165,000$ 165,000$ 501 - RMRA (SB1) 6,480,000 2,480,000 1,000,000 1,000,000 1,000,000 1,000,000 120 - Measure AA 1,250,000 250,000 250,000 250,000 250,000 250,000 - - - - - -
- - - - - -

PROJECT DESCRIPTION AND EXHIBIT
Annual Pavement Rehabilitation Program:

This program provides for the rehabilitation of selected streets based on the City Pavement Management Report, Maintenance Records, and Citizen Input.

PROJECT

PHASE/TASK
TOTAL 5-
YEAR

PROJECT

PROJECTED BUDGETPROPOSED BUDGET

PROJECT SUMMARY
Pavement Rehabilitation Program 057
Citywide Trans. (Maint.)

PRE-REHAB
WILDOMAR TRAIL REHAB (CIP 057 - SUMMER 2020)

POST-REHAB

Page 22 of 72 ends

06.11.25 811

CITY OF WILDOMAR

CAPITAL IMPROVEMENT PROGRAM PROJECT DETAIL SHEET
FY 25/26 to FY 29/30
PROJECT TITLE: CIP NO.: DEPT: Public Works
LOCATION: CATEGORY: MANAGER: Cameron Luna
INITIATED: FY 20/21
FY 25/26 FY 26/27 FY 27/28 FY 28/29 FY 29/30 &
Future Years
Project Dev/Environ. - $ - $ - $ - $ - $ - $
Design/PS&E - - - - - -
Right-of-Way - - - - - -
Construction 2,313,000 913,000 350,000 350,000 350,000 350,000 Const Admin/Inspect. - - - - - -
Total Cost: $ 2,313,000 $ 913,000 350,000$ 350,000$ 350,000$ 350,000$

FUNDING SOURCES
120 - Measure AA $ 1,750,000 $ 350,000 350,000$ 350,000$ 350,000$ 350,000$ - - - -
- - - -
- - - -
- - - -

PROJECT DESCRIPTION AND EXHIBIT
Annual Street Preservation Program:

This program provides for the preservation of existing streets through the application of a Slurry Seal to the street surface. Streets are selected based on the City Pavement Management Report,
Maintenance Records, and Citizen Input.

PROJECT

PHASE/TASK
TOTAL 5-
YEAR

PROJECT

PROJECTED BUDGETPROPOSED BUDGET

PROJECT SUMMARY
Annual Slurry Seal Program 058
Citywide Trans. (Maint.)

CITY-WIDE PROJECT
(EXACT STREETS TO BE DETERMINED

Page 23 of 72 ends

02.10.26 100 - General Fund 15,000 15,000
690 - Measure Z 20,000 20,000
606 - CFD 150,000150,000
378,000201 - Measure A 378,000
812

CITY OF WILDOMAR

CAPITAL IMPROVEMENT PROGRAM PROJECT DETAIL SHEET
FY 25/26 to FY 29/30
PROJECT TITLE: CIP NO.: DEPT: Public Works
LOCATION: CATEGORY: MANAGER: Cameron Luna
INITIATED: FY 20/21
FY 25/26 FY 26/27 FY 27/28 FY 28/29 FY 29/30 &
Future Years
Project Dev/Environ. -$ -$ -$ -$ -$ -$
Design/PS&E - - - - - -
Right-of-Way - - - - - -
Construction 1,750,000 350,000 350,000 350,000 350,000 350,000 Const Admin/Inspect. - - - - - -
Total Cost: 1,750,000$ 350,000$ 350,000$ 350,000$ 350,000$ 350,000$

FUNDING SOURCES
120 - Measure AA 1,750,000$ 350,000$ 350,000$ 350,000$ 350,000$ 350,000$ - - - - - -
- - - - - -
- - - - - -
- - - - - -

PROJECT DESCRIPTION AND EXHIBIT
Annual Street Preservation Program:

This program provides for the preservation of existing streets through the application of a Slurry Seal to the street surface. Streets are selected based on the City Pavement Management Report,
Maintenance Records, and Citizen Input.

PROJECT

PHASE/TASK
TOTAL 5-
YEAR

PROJECT

PROJECTED BUDGETPROPOSED BUDGET

PROJECT SUMMARY
Annual Slurry Seal Program 058
Citywide Trans. (Maint.)

CITY-WIDE PROJECT
(EXACT STREETS TO BE DETERMINED

Page 23 of 72 ends

06.11.25 813

CITY OF WILDOMAR

CAPITAL IMPROVEMENT PROGRAM PROJECT DETAIL SHEET
FY 25/26 to FY 29/30
PROJECT TITLE: CIP NO.: DEPT: Public Works
LOCATION: CATEGORY: MANAGER: Jason Farag
INITIATED: FY 19/20
FY 25/26 FY 26/27 FY 27/28 FY 28/29 FY 29/30 &
Future Years
Project Dev/Environ. - $ - $ - $ - $ - $ - $
Design/PS&E - - - - -
Right-of-Way -
-
- - - -
Construction 495,000 495,000 - - - -
Const Admin/Inspect. 20,000 20,000 - - - -
Total Cost: $ 515,000 $ 515,000 -$ -$ -$ -$

FUNDING SOURCES
$ 515,000 $ - $ - $ - $ - $ 440 - DIF Roads 515,000 - - - -
- - - - - -
- - - - - -
- - - - - -

PROJECT DESCRIPTION AND EXHIBIT
This is a Riverside County Flood Control initiated and managed project. Major elements include:
- A retention basin as the southeast corner of Bundy Canyon Rd. and Monte Vista Dr.
- Reinforced concrete box storm drain from the basin south on Monte Vista Dr. to the Caltrans culvert under the I-15 Freeway. - City has agreed to pay for the design and construction of street improvements on Monte Vista including DG Trail and Fencing. The Construction cost accounts for all optional items including decorative fencing.

PROJECT

PHASE/TASK
TOTAL 5-
YEAR

PROJECT

PROJECTED BUDGETPROPOSED BUDGET

PROJECT SUMMARY
Line C Basin and Storm Drain 063
Southeast Corner of Bundy Cayon Rd. and Monte Vista Dr. Drainage BUNDY CANYON RD.

MONTE VISTA DR.

SELLERS RD.

CANYON RANCH RD.

LATERAL C BASIN

LATERAL C STORM DRAIN
(BLUE)
N

EXISTING CALTRANS

CULVERT

Page 27 of 72 ends

02.10.26 -
- -
814

CITY OF WILDOMAR

CAPITAL IMPROVEMENT PROGRAM PROJECT DETAIL SHEET
FY 25/26 to FY 29/30
PROJECT TITLE: CIP NO.: DEPT: Public Works
LOCATION: CATEGORY: MANAGER: Jason Farag
INITIATED: FY 19/20
FY 25/26 FY 26/27 FY 27/28 FY 28/29 FY 29/30 &
Future Years
Project Dev/Environ. -$ -$ -$ -$ -$ -$
Design/PS&E - - - - -
Right-of-Way - - - - - -
Construction 873,000 873,000 - - - -
Const Admin/Inspect. 20,000 20,000 - - - -
Total Cost: 893,000$ 893,000$ -$ -$ -$ -$

FUNDING SOURCES
201 - Measure A 378,000$ 378,000$ -$ -$ -$ -$
440 - DIF Roads 515,000 515,000 - - - -
- - - - - -
- - - - - -
- - - - - -

PROJECT DESCRIPTION AND EXHIBIT
This is a Riverside County Flood Control initiated and managed project. Major elements include:
- A retention basin as the southeast corner of Bundy Canyon Rd. and Monte Vista Dr.
- Reinforced concrete box storm drain from the basin south on Monte Vista Dr. to the Caltrans culvert under the I-15 Freeway. - City has agreed to pay for the design and construction of street improvements on Monte Vista including DG Trail and Fencing. The Construction cost accounts for all optional items including decorative fencing.

PROJECT

PHASE/TASK
TOTAL 5-
YEAR

PROJECT

PROJECTED BUDGETPROPOSED BUDGET

PROJECT SUMMARY
Line C Basin and Storm Drain 063
Southeast Corner of Bundy Cayon Rd. and Monte Vista Dr. Drainage BUNDY CANYON RD.

MONTE VISTA DR.

SELLERS RD.

CANYON RANCH RD.

LATERAL C BASIN

LATERAL C STORM DRAIN
(BLUE)
N

EXISTING CALTRANS

CULVERT

Page 27 of 72 ends

06.11.25 815

CITY OF WILDOMAR

CAPITAL IMPROVEMENT PROGRAM PROJECT DETAIL SHEET
FY 25/26 to FY 29/30
PROJECT TITLE: CIP NO.: DEPT: Public Works
LOCATION: CATEGORY: MANAGER: Jason Farag
INITIATED: FY 24/25
FY 25/26 FY 26/27 FY 27/28 FY 28/29 FY 29/30 &
Future Years
Project Dev/Environ. - $ - $ - $ - $ - $ - $
Design/PS&E 20,000 20,000 - - - -
Right-of-Way 5,000 5,000 - - - -
Construction - - - -
Const Admin/Inspect. - - - -
Total Cost: $ 25,000 $ 25,000 -$ -$ -$ -$

FUNDING SOURCES
$ 25,000 $ 25,000 - $ - $ - $ - $ 201 - Measure A - - - -
- - - - - -
- - - - - -
- - - - - -

PROJECT DESCRIPTION AND EXHIBIT
To improve the flow of traffic on Wildomar Trail for vehicles driving east to the I-15, the City is working with Caltrans to request permission to restripe part of Wildomar Trail within Caltrans Right-of- Way to provide enough width for a dedicated right-turn lane onto the I- 15 Southbound On-Ramp, to minimize delays to eastbound through traffic.

PROJECT

PHASE/TASK
TOTAL 5-
YEAR

PROJECT

PROJECTED BUDGETPROPOSED BUDGET

PROJECT SUMMARY
Wildomar Trail Interchange Restriping 103
Wildomar Trail/I-15 Trans. (Roads)

Page 57 of 72 ends

02.10.26 - -
-
-
-
-
816

CITY OF WILDOMAR

CAPITAL IMPROVEMENT PROGRAM PROJECT DETAIL SHEET
FY 25/26 to FY 29/30
PROJECT TITLE: CIP NO.: DEPT: Public Works
LOCATION: CATEGORY: MANAGER: Jason Farag
INITIATED: FY 24/25
FY 25/26 FY 26/27 FY 27/28 FY 28/29 FY 29/30 &
Future Years
Project Dev/Environ. - $ - $ - $ - $ - $ - $
Design/PS&E 20,000 20,000 - - - -
Right-of-Way 5,000 5,000 - - - -
Construction 295,000 295,000 - - - -
Const Admin/Inspect. 12,600 12,600 - - - -
Total Cost: 332,600$ 332,600$ -$ -$ -$ -$

FUNDING SOURCES
201 - Measure A 82,600$ 82,600$ - $ - $ - $ - $
120 - Measure AA 250,000 250,000 - - - -
- - - - - -
- - - - - -
- - - - - -

PROJECT DESCRIPTION AND EXHIBIT
To improve the flow of traffic on Wildomar Trail for vehicles driving east to the I-15, the City is working with Caltrans to request permission to restripe part of Wildomar Trail within Caltrans Right-of- Way to provide enough width for a dedicated right-turn lane onto the I- 15 Southbound On-Ramp, to minimize delays to eastbound through traffic.

PROJECT

PHASE/TASK
TOTAL 5-
YEAR

PROJECT

PROJECTED BUDGETPROPOSED BUDGET

PROJECT SUMMARY
Wildomar Trail Interchange Restriping 103
Wildomar Trail/I-15 Trans. (Roads)

Page 57 of 72 ends

06.11.25 817

CITY OF WILDOMAR

NOTICE OF EXEMPTION

TO BE SENT TO: LEAD AGENCY CONTACT:


County of Riverside County Clerk
2724 Gateway Dr.

Riverside, CA 92507

City of Wildomar
23873 Clinton Keith Road, Suite 201
Wildomar, CA 92595
951-677-7751, Ext. 213
Contact Person: Robert Flores, Comm. Dev. Director 
Office of Planning and Research
P.O. Box 3044
Sacramento, CA 95812-3044

PROJECT CASE NO: CIP 057-3/058-3, Bundy Canyon Road Rehab and Slurry Seal Project PROJECT APPLICANT/SPONSOR: Jason Farag, Public Works Director PROJECT LOCATION: Public Streets Citywide
APN(s): Public Right of Way
PROJECT DESCRIPTION: Removal of existing asphalt concrete pavement and AC repairs to 3” total depth, Construct 6" AC Dike, Perform Crack Seal, Asphalt surfacing, ARHM surfacing, Type I Slurry and Type Il PME -RAP Slurry, Reinstall pavement markings, striping, signage and traffic loops, and adjust utilities.

This is to advise that the City of Wildomar, acting as the Lead Agency approved the above-described project on February 10th, 2026, determined the project to be exempt from further environmental review requirements contained in the California Environmental Quality Act (CEQA).

EXEMPTION STATUS:

- Ministerial (Sec. 21080(b)(1); Sec. 15268)

- Declared Emergency (Sec. 21080(b)(3); Sec. 15269(a))

- Statutory Exemption

 General Rule /
Categorical Exemption
Section 15301(c) - Existing Facilities

- Other: (Sec. .

REASONS TO SUPPORT EXEMPTION FINDINGS:

The project involves pavement maintenance and/or preservation of existing public streets throughout the City. The project will involve no expansion of an existing use. The project will not result in significant environmental impacts.

Based upon the identified exemptions above, the City of Wildomar hereby concludes that no physical environmental impacts are anticipated to occur and the project as proposed is exempt under CEQA. No further environmental analysis is warranted.

LEAD AGENCY CONTACT: Robert Flores

PHONE NUMBER: (951) 677-7751, Ext. 213

________________________________________ __ _____________________________________ Robert Flores, Community Development Director Date
818
CIP 057-3/058-3
Bundy Canyon
Road Rehab &
Slurry Seal Projects
Public Works/Engineering
Department
City of Wildomar
City Council Meeting February 10, 2025
819
Road Rehab
Street
(CIP 057-3)
820
Slurry Seal
Streets
(CIP 058-3)
821
Road Selection Criteria

PAVEMENT

CONDITION INDEX
(PCI)

ROADWAY PRIORITY FUTURE

OVERLAPPING

PROJECTS

PUBLIC INPUT

REHABILITATION
COSTS
822
Pavement
Condition
Index
PCI Condition Description
90-100 Excellent
70-90 Good
50-70 Fair/At Risk
25-50 Poor
0-25 Very Poor/Failed
823
Road Selection Criteria

PAVEMENT

CONDITION INDEX
(PCI)

ROADWAY PRIORITY FUTURE

OVERLAPPING

PROJECTS

PUBLIC INPUT

REHABILITATION
COSTS
824
Roadway
Priority
825
Road Selection Criteria

PAVEMENT

CONDITION INDEX
(PCI)

ROADWAY PRIORITY FUTURE

OVERLAPPING

PROJECTS

PUBLIC INPUT

REHABILITATION
COSTS
826
Road Selection Criteria

PAVEMENT

CONDITION INDEX
(PCI)

ROADWAY PRIORITY FUTURE

OVERLAPPING

PROJECTS

PUBLIC INPUT

REHABILITATION
COSTS
827
Road Selection Criteria

PAVEMENT

CONDITION INDEX
(PCI)

ROADWAY PRIORITY FUTURE

OVERLAPPING

PROJECTS

PUBLIC INPUT

REHABILITATION
COSTS
828
Questions?
Cameron Luna
[email protected]
Jason Farag
[email protected]
951-677-7751 x200
[email protected]
Check our website for
project updates!
https://www.wildomar.gov/266/Cons
truction-Alerts
829
1 WILDOMAR GENERAL NOTES:

CONTRACTOR'S RESPONSIBILITY FOR SAFETY:
14 CITY OF WILDOMARBUNDY CANYON ROAD MAINTENANCE AND REHABILITATION PROJECT

TITLE SHEET
WILDOMAR TRAFFIC CONTROL GENERAL NOTES:

Docusign Envelope ID: 4878CB94-7A8C-4A13-B08E-349698340A85 12/23/2025
673830
© 2025 Microsoft Corporation © 2025 Maxar ©CNES (2025) Distribution Airbus DS © 2025 Microsoft Corporation © 2025 Maxar ©CNES (2025) Distribution Airbus DS © 2025 Microsoft Corporation © 2025 Maxar ©CNES (2025) Distribution Airbus DS © 2025 Microsoft Corporation © 2025 Maxar ©CNES (2025) Distribution Airbus DS © 2025 Microsoft Corporation © 2025 Maxar ©CNES (2025) Distribution Airbus DS © 2025 Microsoft Corporation © 2025 Maxar ©CNES (2025) Distribution Airbus DS © 2025 Microsoft Corporation © 2025 Maxar ©CNES (2025) Distribution Airbus DS 14 CITY OF WILDOMARBUNDY CANYON ROAD MAINTENANCE AND REHABILITATION PROJECT 2STA. 10+00 TO STA. 30+00
40 25
Docusign Envelope ID: 4878CB94-7A8C-4A13-B08E-349698340A85 12/23/2025
674831
© 2025 Microsoft Corporation © 2025 Maxar ©CNES (2025) Distribution Airbus DS oft Corporation © 2025 Maxar ©CNES (2025) Distribution Airbus DS © 2025 Microsoft Corporation © 2025 Maxar ©CNES (2025) Distribution Airbus DS 14 CITY OF WILDOMARBUNDY CANYON ROAD MAINTENANCE AND REHABILITATION PROJECT 3STA. 30+00 TO STA. 50+00
25 Docusign Envelope ID: 4878CB94-7A8C-4A13-B08E-349698340A85 12/23/2025
675832
© 2025 Microsoft Corporation © 2025 Maxar ©CNES (2025) Distribution Airbus DS © 2025 Microsoft Corporation © 2025 Maxar ©CNES (2025) Distribution Airbus DS © 2025 Microsoft Corporation © 2025 Maxar ©CNES (2025) Distribution Airbus DS © 2025 Microsoft Corporation © 2025 Maxar ©CNES (2025) Distribution Airbus DS orporation © 2025 Maxar ©CNES (2025) Distribution Airbus DS orporation © 2025 Maxar ©CNES (2025) Distribution Airbus DS 14 CITY OF WILDOMARBUNDY CANYON ROAD MAINTENANCE AND REHABILITATION PROJECT 4STA. 50+00 TO STA. 70+00
40 Docusign Envelope ID: 4878CB94-7A8C-4A13-B08E-349698340A85 12/23/2025
676833
© 2025 Microsoft Corporation © 2025 Maxar ©CNES (2025) Distribution Airbus DS © 2025 Microsoft Corporation © 2025 Maxar ©CNES (2025) Distribution Airbus DS rosoft Corporation © 2025 Maxar ©CNES (2025) Distribution Airbus DS © 2025 Microsoft Corporation © 2025 Maxar ©CNES (2025) Distribu © 2025 Microsoft Corporation © 2025 Maxar ©CNES (2025) Distribution Airbus DS © 2025 Microsoft Corporation © 2025 Maxar ©CNES (2025) Distribution Airbus DS 2025 Maxar ©CNES (2025) Distribution Airbus DS
14 CITY OF WILDOMARBUNDY CANYON ROAD MAINTENANCE AND REHABILITATION PROJECT 5STA. 112+88 TO STA. 133+00
25 Docusign Envelope ID: 4878CB94-7A8C-4A13-B08E-349698340A85 12/23/2025
677834
poration © 2025 Maxar ©CNES (2025) Distribution Airbus DS © 2025 Microsoft Corporation © 2025 Maxar ©CNES (2025) Distribution Airbus DS Maxar ©CNES (2025) Distribution Airbus DS
© 2025 Microsoft Corporation © 2025 Maxar ©CNES (2025) Distribution Airbus DS © 2025 Microsoft Corporation © 2025 Maxar ©CNES (2025) Distribution Airbus DS rporation © 2025 Maxar ©CNES (2025) Distribution Airbus DS 5 Maxar ©CNES (2025) Distribution Airb
© 2025 Microsoft Corporation © 2025 Maxar ©CNES (2025) Distribution Airbus DS 5 Maxar ©CNES (2025) Distribution Ai
5 Maxar ©CNES (2025) Distribution Airbus DS
© 2025 Microsoft Corporation © 2025 Maxar ©CNES (2025) Distribution Airbus DS 5 Maxar ©CNES (2025) Distribution Airbus DS
5 Maxar ©CNES (2025) Distribution Airbus DS
14 CITY OF WILDOMARBUNDY CANYON ROAD MAINTENANCE AND REHABILITATION PROJECT 6STA. 133+00 TO STA. 153+00
5025
Docusign Envelope ID: 4878CB94-7A8C-4A13-B08E-349698340A85 12/23/2025
678835
© 2025 Microsoft Corporation © 2025 Maxar ©CNES (2025) Distribution Airbus DS r ©CNES (2025) Distribution Airbus DS
5 Maxar ©CNES (2025) Distribution Airbus DS
© 2025 Microsoft Corporation © 2025 Maxar ©CNES (2025) Distribution Airbus DS 5 Maxar ©CNES (2025) Distribution Airbus DS
5 Maxar ©CNES (2025) Distribution Airbus DS
© 2025 Microsoft Corporation © 2025 Maxar ©CNES (2025) Distribution Airbus DS © 2025 Microsoft Corporation © 2025 Maxar ©CNES (2025) Distribution Airbus DS © 2025 Microsoft Corporation © 2025 Maxar ©CNES (2025) Distribution Airbus DS © 2025 Microsoft Corporation © 2025 Maxar ©CNES (2025) Distribution Airbus DS © 2025 Microsoft Corporation © 2025 Maxar ©CNES (2025) Distribution Airbus DS 14 CITY OF WILDOMARBUNDY CANYON ROAD MAINTENANCE AND REHABILITATION PROJECT 7STA. 153+00 TO STA. 173+00
Docusign Envelope ID: 4878CB94-7A8C-4A13-B08E-349698340A85 12/23/2025
679836
© 2025 Microsoft Corporation © 2025 Maxar ©CNES (2025) Distribution Airbus DS © 2025 Microsoft Corporation © 2025 Maxar ©CNES (2025) Distribution Airbus DS © 2025 Microsoft Corporation © 2025 Maxar ©CNES (2025) Distribution Airbus DS © 2025 Microsoft Corporation © 2025 Maxar ©CNES (2025) Distribution Airbus DS © 2025 Microsoft Corporation © 2025 Maxar ©CNES (2025) Distribution Airbus DS 5 Maxar ©CNES (2025) Distribution Airbus DS
© 2025 Microsoft Corporation © 2025 Maxar ©CNES (2025) Distribution © 2025 Microsoft Corporation © 2025 Maxar ©CNES (2025) Distribution Airbus DS 5 Maxar ©CNES (2025) Distribution Airbus DS
14 CITY OF WILDOMARBUNDY CANYON ROAD MAINTENANCE AND REHABILITATION PROJECT 8STA. 173+00 TO STA. 193+00
50 Docusign Envelope ID: 4878CB94-7A8C-4A13-B08E-349698340A85 12/23/2025
680837
Maxar ©CNES (2025) Distribution Airbus DS
© 2025 Microsoft Corporation © 2025 Maxar ©CNES (2025) Distribution Airbus DS ©CNES (2025) Distribution Airbus DS
5 Maxar ©CNES (2025) Distribution Airbus DS
5 Maxar ©CNES (2025) Distribution Airbus DS
© 2025 Microsoft Corporation © 2025 Maxar ©CNES (2025) Distribution Airbus DS xar ©CNES (2025) Distribution Airbus DS
ribution Airbus DS
5 Maxar ©CNES (2025) Distribution Airbus DS
5 Maxar ©CNES (2025) Distribution Airbus DS
5 Maxar ©CNES (2025) Distribution Airbus DS
14 CITY OF WILDOMARBUNDY CANYON ROAD MAINTENANCE AND REHABILITATION PROJECT 9STA. 193+00 TO STA. 213+00
Docusign Envelope ID: 4878CB94-7A8C-4A13-B08E-349698340A85 12/23/2025
681838
5 Maxar ©CNES (2025) Distribution Airbus DS
5 Maxar ©CNES (2025) Distribution Airbus DS
5 Maxar ©CNES (2025) Distribution Airbus DS
5 Maxar ©CNES (2025) Distribution Airbus DS
14 CITY OF WILDOMARBUNDY CANYON ROAD MAINTENANCE AND REHABILITATION PROJECT 10STA. 213+00 TO STA. 233+00
50 Docusign Envelope ID: 4878CB94-7A8C-4A13-B08E-349698340A85 12/23/2025
682839
© 2025 Microsoft Corporation © 2025 Maxar ©CNES (2025) Distribution Airbus DS 2025) Distribution Airbus DS
14 CITY OF WILDOMARBUNDY CANYON ROAD MAINTENANCE AND REHABILITATION PROJECT 11STA. 233+00 TO STA. 243+00
50 Docusign Envelope ID: 4878CB94-7A8C-4A13-B08E-349698340A85 12/23/2025
683840
© 2025 Microsoft Corporation © 2025 Maxar ©CNES (2025) Distribution Airbus DS © 2025 Microsoft Corporation © 2025 Maxar ©CNES (2025) Distribution Airbus DS © 2025 Microsoft Corporation © 2025 Maxar ©CNES (2025) Distribution Airbus DS © 2025 Microsoft Corporation © 2025 Maxar ©CNES (2025) Distribution Airbus DS © 2025 Microsoft Corporation © 2025 Maxar ©CNES (2025) Distribution Airbus DS © 2025 Microsoft Corporation © 2025 Maxar ©CNES (2025) Distribution Airbus DS © 2025 Microsoft Corporation © 2025 Maxar ©CNES (2025) Distribution Airbus DS 14 CITY OF WILDOMARBUNDY CANYON ROAD MAINTENANCE AND REHABILITATION PROJECT 12STA. 10+00 TO STA. 30+00STRIPING PLAN
Docusign Envelope ID: 4878CB94-7A8C-4A13-B08E-349698340A85 12/23/2025
684841
© 2025 Microsoft Corporation © 2025 Maxar ©CNES (2025) Distribution Airbus DS oft Corporation © 2025 Maxar ©CNES (2025) Distribution Airbus DS © 2025 Microsoft Corporation © 2025 Maxar ©CNES (2025) Distribution Airbus DS 14 CITY OF WILDOMARBUNDY CANYON ROAD MAINTENANCE AND REHABILITATION PROJECT 13STA. 30+00 TO STA. 50+00STRIPING PLANS
Docusign Envelope ID: 4878CB94-7A8C-4A13-B08E-349698340A85 12/23/2025
685842
© 2025 Microsoft Corporation © 2025 Maxar ©CNES (2025) Distribution Airbu © 2025 Microsoft Corporation © 2025 Maxar ©CNES (2025) Distribution Airb © 2025 Microsoft Corporation © 2025 Maxar ©CNES (2025) Distribution Airbus DS © 2025 Microsoft Corporation © 2025 Maxar ©CNES (2025) Distribution Airbus DS © 2025 Microsoft Corporation © 2025 Maxar ©CNES (2025) Distribution Airbus DS © 2025 Microsoft Corporation © 2025 Maxar ©CNES (2025) Distribution Airbus DS 14 CITY OF WILDOMARBUNDY CANYON ROAD MAINTENANCE AND REHABILITATION PROJECT 14STA. 50+00 TO STA. 70+00STRIPING PLANS
Docusign Envelope ID: 4878CB94-7A8C-4A13-B08E-349698340A85 12/23/2025
686843