City of Williams
City Council Agenda
810 E Street/P.O. Box 310, Williams, CA 95987
CITY COUNCIL
COUNCIL CHAMBERS
WEDNESDAY, OCTOBER 21, 2026
OPEN SESSION
6:00 PM
MEETINGS CAN BE VIEWED AS A COURTESY VIA LIVESTREAM WITH THE FOLLOWING LINK:
https://media.avcaptureall.cloud/?customerGuid=d23ae512-c286-470b-b4b1- ab65a0145ac2&target=foo&view=thumbs&tabs=past|today|upcoming FULL PACKETS CAN BE FOUND WITH THE FOLLOWING LINK:
https://www.cityofwilliams.org/government/city_council/agenda_minutes/index.php#outer-211 A. CALL TO ORDER
B. ROLL CALL
C. PLEDGE OF ALLEGIANCE
D. PUBLIC COMMENT
This is an opportunity for the public to speak to the Council on any item other than those listed for public hearing on this Agenda. Speakers are requested to use the podium in front of the Council and to begin by stating their name, whether they reside in Williams and the name of the organization they represent if any. The mayor may impose a time limit on any speaker depending on the number of people wanting to speak and time available for the rest of the agenda. In the event comments are related to an item scheduled on the agenda, speakers should wait to make their comments until that item is considered.
E. WRITTEN COMMUNICATIONS
1. Receive Letter from Recology regarding their Annual Rate Increase.
2. Receive El Niño letter from the State Water Resources Control Board and Governors Emergency Proclamation.
3. Receive Letter of Recommendation for the Chief of Jackets at City Hall from Mayor Pro Tem.
4. Receive Antidegradation Analysis from PACE Engineering. 1 F. PUBLIC HEARING
5. Introduce and waive the first reading of Ordinance 282-26, Amending Title 15 of the Williams Municipal Code by Adding Chapter 15.33, “Electric Vehicle Streamlining and Expedited Permitting,” setting forth procedures for an expedited, streamlined permitting process for electric vehicle charging stations
G. CONSENT
These items are routine in nature and will be approved by a single action unless an individual Council Member or member of the public requests an item be removed from the consent calendar for special consideration.
6. Approve the minutes of the Regular City Council Meeting of September 16, 2026.
7. Approve Resolution 26-34, the Governing Body authorization Resolution for the FFY2024 Cybersecurity Grant.
8. Approve Resolution 26-35, City Council Designate the City Manager as the authorized representative for the Water Manganese Mitigation Project
9. Approve Resolution 26-36, approving Non-Voting Membership of the City of Williams in the California Municipal Public Financing Authority (CalMuni PFA) and authorizing the Mayor and City Manager to execute a Non-Voting Member Agreement with CalMuni PFA.
10. Approve letter of support from Mayor Dunlap in support of Intent of the Revitalize Rural American Act as requested by Congressmen Gallagher and Thompson.
H. OLD BUSINESS
11. Receive Treasurers Investment Report and Monthly Register for August 2026; Monthly Financial Status Reports as of August 2026.
I. NEW BUSINESS
12. Approve Resolution 26-37 and award city contract 02-26 Caltrans HSIP Project No.
H11-03-025 to St. Francis Electric, LLC in the amount of $287,107, authorize City Manager to execute the contract and approve a 10% contingency for a total project budget not to exceed $315,818.
13. Approve Resolution 26-38 and award city contract 03-26 Caltrans HSIP Project No. H11- 03-026 in the amount of $258,974, authorize City Manager to execute the contract and approve a 10% contingency for a total project budget not to exceed $284,871.40.
14. Approve 9th St Median Redesign Options for the E-street Complete Street Project. 2 15. Approve Resolution 26-39 and award city contract 05-26 to Tungsten Engineering Contractors, LLC in the amount of $1,472,074, authorize City Manager to execute the contract and approve a 10% contingency for a total project budget not to exceed $1,619,281. award for E-Street water sewer improvement project.
16. Approve Resolution 26-40, approving the Business License and Building Fees to increase annually by CPI.
17. Authorize the purchase of one 2027 Ford F-450 service truck using Water Enterprise Fund monies and one 2027 Ford F-350 utility truck with utility bed and lift gate using Sewer Enterprise Fund monies.
• Authorize a budgetary increase of $94,867 and $62,711 for the Water and Sewer Enterprise Funds.
• Authorize the 2010 Ford F-450 and the 2010 Ford F-150 to be declared surplus and sent to auction once the replacement truck is placed in service.
18. Approve Employment Contract Amendment for the City Manager.
J. COUNCIL REPORTS AND COMMITTEE UPDATES
1. Council Member Parsons
2. Council Member Belmontes Leyva
3. Council Member Dunlap
4. Council Member Sellers, Jr.
5. Council Member Troughton, Jr.
K. STAFF GENERAL REPORTS AND DISCUSSION
1. Jackets at City Hall
2. City Attorney
3. City Manager
4. Police Chief
5. Fire Chief
6. Finance Director
7. City Planner
8. Parks & Recreation Director
3 L. CLOSED SESSION
CONFERENCE WITH LABOR NEGOTIATORS (Gov't. Code Sec. 54957.6) Agency Designated Representative: Andreas Booher, City Attorney Unrepresented Employee: City Manager
M. ADJOURNMENT
I, Mariana Pineda, City Clerk for the City of Williams, declare that the foregoing Agenda for the October 21, 2026, Regular Meeting of the Williams City Council was posted on Friday October 16, 2026, at the office of the City of Williams, 810 E St., Williams, California, 95987 and was available for public review at that location.
Dated: October 16, 2026
Sel.
Selene Tapia on behalf Mariana Pineda, City Clerk
In compliance with the Americans with Disabilities Act, persons needing a disability-related modification or accommodation, including auxiliary aids or services, to participate in this meeting, may contact City Clerk Mariana Pineda, at (530) 473-2955 or (530) 235-3276 by Fax at (530) 473-2445 or by email to [email protected] at least 48 hours prior to the meeting 2026 CITY COUNCIL MEETING SCHEDULE
January 21, 2026 April 15, 2026 July 15, 2026 October 21, 2026 February 18, 2026 May 20, 2026 August 19, 2026 November 18, 2026 March 18, 2026 June 17, 2026 September 16, 2026 December 9, 2026 \
Ciudad de Williams
Agenda del Consejo 810 Calle E/P.O. Box 310, Williams, CA 95987
CONSEJO DE LA CIUDAD
SALA DE JUNTAS DEL CONSEJO
MIERCOLES, OCTUBRE 21, 2026
SESIÓN ABIERTA
6:00 PM
LAS REUNIONES PUEDEN VERSE COMO CORTESÍA A TRAVÉS DE TRANSMISIÓN EN VIVO EN EL SIGUIENTE ENLACE.
https://media.avcaptureall.cloud/?customerGuid=d23ae512-c286-470b-b4b1- ab65a0145ac2&target=foo&view=thumbs&tabs=past|today|upcoming LOS PAQUETES COMPLETOS PUEDEN ENCONTRARSE EN EL SIGUIENTE ENLACE:
https://www.cityofwilliams.org/government/city_council/agenda_minutes/index.php#outer-211 A. APERTURA DE SESSION
B. LISTA DE ASSISTENCIA
C. JURAMENTO A LA BANDERA
D. COMENTARIOS DE LA AUDIENCIA
Esta es una oportunidad para que el público se dirija al Concejo sobre cualquier asunto que no esté incluido como audiencia pública en esta agenda. Se solicita al público que utilicen el podio ubicado frente al Concejo y que comiencen indicando su nombre, si residen en Williams y el nombre de la organización que representan, si corresponde. El alcalde puede establecer un límite de tiempo para cada persona, dependiendo del número de personas que deseen hablar y del tiempo disponible para el resto de la agenda. En caso de que los comentarios estén relacionados con un tema programado en la agenda, el público deberá esperar a que dicho tema sea considerado para hacer sus comentarios.
E. COMUNICACIONES POR ESCRITO
1. Reciban una carta de Recology respecto a su aumento anual en las tarifas.
2. Reciban la carta sobre El Niño de la Junta Estatal de Control de Recursos Hídricos y la Proclamación de Emergencia del Gobernador.
3. Reciban Carta de Recomendación para el Jefe de Jackets en el Ayuntamiento de parte del Alcalde Pro Tem.
5 4. Reciban Análisis de Anti-degradación de PACE Engineering.
F. AUDIENCIA PUBLICA
5. Introducir y eximir la primera lectura de la Ordenanza 282-26, que modifica el Título 15 del Código Municipal de Williams al agregar el Capítulo 15.33, "Optimización de Vehículos Eléctricos y Permisos Acelerados", estableciendo procedimientos para un proceso de permisos acelerado y simplificado para estaciones de carga de vehículos eléctricos.
G. ASUNTOS DE CONSENTIMIENTO
Estos asuntos son de carácter rutinario y serán aprobados mediante una sola acción, a menos que un miembro individual del Concejo o del público solicite que un asunto sea retirado del orden del día de consentimiento para su consideración especial.
6. Aprobar las Actas de la Reunión Regular del Concejo Municipal del 16 de Septiembre del 2026.
7. Aprobar Resolución 26-34, una Resolución de la Agencia de Gobierno para la FFY2024 Subvención de Ciberseguridad.
8. Aprobar la Resolución 26-35, mediante la cual el Concejo Municipal designa al Administrador de la Ciudad como representante autorizado para el Proyecto de Mitigación de Manganeso en el Agua.
9. Aprobar la Resolución 26-36, que aprueba la membresía sin derecho a voto de la Ciudad de Williams en la Autoridad Municipal de Financiamiento Público de California (CalMuni PFA) y autoriza al alcalde y al administrador municipal a firmar un Acuerdo de Miembro Sin Derecho a Derecho con CalMuni PFA.
10. Aprobar la carta de apoyo de la alcaldesa Dunlap a los objetivos de la Ley para Revitalizar las Zonas Rurales de Estados Unidos (Revitalize Rural America Act), según lo solicitado por los congresistas Gallagher y Thompson.
H. ASUNTOS PREVIOS
11. Recibir el Informe de Inversiones del Tesorero y el Registro Mensual de Agosto del 2026; y Reportes Mensuales del Estado Financiero de Agosto del 2026.
I. ASUNTOS NUEVOS
12. Aprobar la Resolución 26-37 y adjudicar el Contrato Municipal 02-26, Proyecto de Caltrans HSIP No. H11-03-025, a St. Francis Electric, LLC, por un monto de $287,107; autorizar al Administrador de la Ciudad a firmar el contrato y aprobar un fondo de contingencia del 10%, para un presupuesto total del proyecto que no exceda los $315,818. 6 13. Aprobar la Resolución 26-38 y adjudicar el Contrato Municipal 03-26, Proyecto de Caltrans HSIP No. H11-03-026, por un monto de $258,974; autorizar al Administrador de la Ciudad a firmar el contrato y aprobar un fondo de contingencia del 10%, para un presupuesto total del proyecto que no exceda los $284,871.40.
14. Aprobar las opciones de rediseño del camellón central de la Calle 9 para el Proyecto de Calle Completa de E Street.
15. Aprobar la Resolución 26-39 y adjudicar el Contrato Municipal 05-26 a Tungsten Engineering Contractors, LLC, por un monto de $1,472,074 para el Proyecto de Mejoras de Agua y Alcantarillado de E Street; autorizar al Administrador de la Ciudad a firmar el contrato y aprobar un fondo de contingencia del 10%, para un presupuesto total del proyecto que no exceda los $1,619,281.
16. Aprobar la Resolución 26-40, que aprueba que la Licencia de Negocios y las Cuotas de Construcción aumenten anualmente por el índice de precios del consumidor.
17. Autorizar la compra de un camión de servicio Ford F-450 2027 usando fondos del Fondo de Empresas de Agua y un camión utilitario Ford F-350 2027 con caja de servicios y compuerta trasera, utilizando fondos del Fondo de Empresas de Alcantarillado. • Autorizar un aumento presupuestal de $94,867 y $62,711 para los Fondos de Empresa de Agua y Alcantarillado.
• Autorizar que el Ford F-450 2010 y el Ford F-150 2010 sean declarados excedentes y enviados a subasta una vez que el camión de reemplazo esté en servicio.
18. Aprobar la Enmienda del Contrato para el Gerente de la Ciudad.
J. INFORMES DEL CONCEJO Y ACTUALIZACIONES DE COMITÉS
1. Consejal Parsons
2. Consejal Belmontes Leyva
3. Consejal Dunlap
4. Consejal Sellers, Jr.
5. Consejal Troughton, Jr.
K. INFORMES GENERALES DE PERSONAL
1. Jefe de Jackets en el Ayuntamiento
2. Abogado de la Ciudad
3. Gerente de la Ciudad
4. Jefe de Policia
5. Jefe de Bomberos
6. Director de Contabilidad
7. Planificador de la Ciudad
8. Director de Parques y Recreación
7 8
City of Williams DATE: October 21, 2026
City Council ITEM: 1-3.
Agenda Report CATEGORY: Communications
SUBJECT: WRITTEN COMMUNICATIONS
SUMMARY
Attached are written communications received for the following:
• Letter from Recology regarding their Annual Rate Increase. • Letter from State Water Resources Control Board and Governors Emergency Proclamation.
• Letter of Recommendation for the Chief of Jackets at City Hall from Mayor Pro Tem.
RECOMMENDATION
No action is required. Information only.
Reviewed and Submitted by: Yvonne Kimball, City Manager Attachments (3)
9 P.O. Box 1512 Oroville, CA 95965 T: 530.533.4783 www.recologybuttecolusa.com Proud to be employee owned.
28 August 2026
Yvonne Kimball
City Manager
PO Box 310
Williams, CA 94533
RE: Waste Collection Service Rate Effective January 1, 2027 Dear Ms. Kimball:
Please accept this letter and supporting documents as our written request for a rate increase per the Franchise Agreement.
The rate adjustment formulas consist of three components; the base rate component increased 3.8%, the fuel component increased 38.4%, and the disposal component increased 1%. The supporting schedules show how the increase to the individual rate component is applied to current rate.
The residential rate adjustment formula results in a 3.93% increase, which equates to a $1.64 increase per month for a 96-gallon service. On average, commercial rates will increase 3.9% above the current rates.
The new rates will become effective January 1, 2027.
Sincerely,
Marci Walton
General Manager
Cc: Ed Farewell
Seth Hansen
10 State Water Resources Control Board
October 9, 2026
ATTN: Sanitary Sewer Collection Systems
PREPARATION FOR ANTICIPATED 2026-2027 EL NIÑO RAINY SEASON The State Water Resources Control Board and Regional Water Quality Control Boards (collectively, Water Boards) are notifying you to prepare your sanitary sewer system for the 2026-2027 rainy season.
On September 21, 2026, Governor Gavin Newsom issued a proclamation of a state of emergency in preparation for potential severe weather and flooding associated with the predicted El Niño event. El Niño is a natural climate pattern that occurs when a band of warm water develops in the Pacific Ocean which causes higher than average rainfall throughout the state.
To minimize sanitary sewer system spills due to severe storms, Sanitary Sewer Systems General Order enrollees must have an up-to-date emergency response plan and complete preventative maintenance: reduce inflow and infiltration, fix structural vulnerabilities, ensure adequate system capacity.
The Water Boards will evaluate rain-related spills to determine if the enrollee took appropriate preventative maintenance and preparation measures for the rainy season.
Failure to demonstrate adequate preventative measures may result in an enforcement action.
If you have questions, please contact [email protected].
Sincerely,
Phillip Crader, Deputy Director
Division of Water Quality
11 EXECUTIVE DEPARTMENT
STATE OF CALIFORNIA
PROCLAMATION OF A STATE OF EMERGENCY
WHEREAS in the past several years, California has experienced increasingly severe and destructive storms, including atmospheric river events that have caused widespread flooding, mud and debris flows, landslides, high winds, power outages, road and highway closures, evacuation orders, damage to homes and critical infrastructure, and disruption of essential services; and WHEREAS climate change is intensifying these weather and hydrologic extremes in California, contributing to increasingly severe swings between drought and flooding, and heightening the risks that extreme storms pose to communities, infrastructure, natural resources, and the economy; and WHEREAS California is entering the 2026–2027 wet season amid the ongoing development of a strong and likely historic El Niño event in the Pacific Ocean; and
WHEREAS the National Oceanic and Atmospheric Administration’s National Weather Service Climate Prediction Center, in its August 13, 2026, diagnostic report, found that the El Niño event is strengthening, with a greater than 90 percent chance of a very strong event during Northern Hemisphere fall and winter of 2026–2027; and
WHEREAS the Climate Prediction Center projected a 69 percent chance that the event will reach historic strength during the October through December 2026 season, defined as a three-month Relative Oceanic Niño Index, and exceeding the strength of all prior El Niño events in the historical record beginning in 1950; and
WHEREAS the National Weather Service Climate Prediction Center has found that atmospheric conditions over the tropical Pacific are consistent with a strengthening El Niño, including changes in equatorial winds and an eastward shift in enhanced convection and rainfall toward the central and eastern Pacific, making it more likely that at least some parts of California will experience stronger storms in coming months; and
WHEREAS elevated baseline coastal water levels, combined with high tides, large waves, high surf, and coastal storms, can increase risks of coastal flooding, beach erosion, bluff erosion, transportation disruption, and damage to public and private infrastructure; and
WHEREAS California has already begun to experience effects attributed to this El Niño event, including unusual precipitation and significant coastal flooding; and
WHEREAS historical experience demonstrates that very strong El Niño events do not produce uniform statewide outcomes, but can be associated with exceptionally wet and destructive winter conditions in California; and WHEREAS California’s recent experience with atmospheric rivers, debris flows following wildfires, flash flooding, coastal erosion, inundation, and damage to transportation and flood-control infrastructure demonstrates the importance of procuring and positioning resources, clearing waterways, and taking additional actions to prepare before severe storms arrive; and WHEREAS areas affected by recent wildfires are particularly susceptible to flash flooding, mud and debris flows, erosion, sediment transport, and road closures during high-intensity rainfall; and
12 WHEREAS in light of that experience, local governments, local water agencies, and local flood control authorities have requested action now to enable them to move quickly to begin preparations for preventing and responding to the impacts of potential flooding; and
WHEREAS low-income communities, farmworker families, rural residents, seniors, persons with disabilities, residents with limited transportation access, people experiencing homelessness, and communities in flood-prone, coastal, or post-fire areas may face disproportionate risks; and
WHEREAS the demonstrated potential for a very strong or historic-strength El Niño event to cause elevated coastal water levels and high-impact storms in California warrants early, coordinated, and targeted preparedness actions to protect Californians, critical infrastructure, agricultural lands, natural resources, and the State’s economy; and
WHEREAS under the provisions of Government Code section 8558(b), I find that conditions of extreme peril to the safety of persons and property exist due to the developing El Niño event; and
WHEREAS under the provisions of Government Code section 8558(b), I find that the developing El Niño event is likely to cause conditions that, by reason of their magnitude, are likely to be beyond the control of the services, personnel, equipment, and facilities of any single local government and require the combined forces of a mutual aid region or regions to appropriately respond; and
WHEREAS under the provisions of Government Code section 8625(c), I find that local authority is inadequate to cope with the magnitude of the extreme peril posed by the developing El Niño event; and
WHEREAS under the provisions of Government Code section 8571, I find that strict compliance with various statutes and regulations specified in this Proclamation would prevent, hinder, or delay the mitigation of the effects of the developing El Niño event.
NOW, THEREFORE, I, GAVIN NEWSOM, Governor of the State of California, in accordance with the authority vested in me by the State Constitution and statutes, including the California Emergency Services Act, and in particular, Government Code section 8625, HEREBY PROCLAIM A STATE OF EMERGENCY to exist statewide due to the developing 2026–2027 El Niño event.
IT IS HEREBY ORDERED THAT:
1. All agencies of the state government are to utilize and employ state personnel, equipment, and facilities for the performance of any and all activities consistent with the direction of the Governor’s Office of Emergency Services and the State Emergency Plan. The Governor’s Office of Emergency Services shall coordinate statewide preparedness activities for potential severe weather, flooding, coastal flooding, erosion, mud and debris flows, and related impacts associated with conditions resulting from the El Niño event, including atmospheric rivers and other severe storm systems. The Governor’s Office of Emergency Services shall work with local and tribal governments to support emergency planning, resource coordination, and requests for state assistance. To protect their safety, all residents are to obey the direction of emergency officials with regard to this emergency.
13 2. As necessary to assist local governments and for the protection of public safety and the environment, state agencies shall enter into contracts to arrange for the procurement of materials, goods, and services necessary to quickly assist with the response to and recovery from the impacts of this emergency. Applicable provisions of the Government Code and the Public Contract Code, including but not limited to travel, advertising, and competitive bidding requirements, are suspended to the extent necessary to address the effects of this emergency.
3. The California Environmental Protection Agency and the California Natural Resources Agency, including boards, departments, and offices within those agencies, are directed to prioritize work to help local agencies prepare for anticipated impacts from the El Niño event. In particular, those state agencies are directed to prioritize permitting, consultation, and technical assistance to support local efforts to prevent or mitigate impacts from anticipated or potential flooding, landslides, and mud and debris flows, including local efforts to expedite levee and other flood management infrastructure repairs, vegetation management, debris removal, sediment management, bridge scour protection, and channel-capacity improvements. State agencies are directed to work with local agencies to issue any necessary permits or other approvals for such efforts as quickly as possible, including by identifying and invoking existing emergency authorities or other pathways for streamlined review.
On or before October 16, 2026, the Secretary for Environmental Protection and the Secretary of the Natural Resources Agency shall submit a joint recommendation to my office as to whether further action or emergency suspensions are necessary to support and expedite this work.
4. The Governor’s Office of Emergency Services shall coordinate the State’s preparation for and response to the developing El Niño event, including by working with the Department of Water Resources and other appropriate government agencies to prepare to pre-position personnel, equipment, supplies, commodities, and other resources based on forecast conditions, local needs, and identified risks. In particular, this work shall draw on the Department of Water Resources’ guidance regarding flood-risk-reduction activities.
5. The Department of Water Resources shall take appropriate action to procure, maintain, stage, pre-position, distribute, and replenish flood-fight supplies, equipment (including, but not limited to, sandbags, riprap and other rock materials, plastic sheeting, and pumps), and other materials necessary to support statewide flood preparedness, response, and protective actions in connection with the El Niño event. The Department of Water Resources shall coordinate with appropriate government agencies to identify priority areas for flood-fight material staging and plans to make these materials available where they are needed, when they are needed.
6. The Department of Water Resources, through its Division of Safety of Dams, shall conduct outreach to owners of jurisdictional dams regarding potential severe conditions during the El Niño event and shall reiterate to dam owners their responsibilities to inspect, operate, maintain, repair, and safely manage their dams and appurtenant structures in accordance 14 with applicable law, permit conditions, emergency action plans, and directives of the Division of Safety of Dams.
7. The Governor’s Office of Emergency Services, in coordination with the Department of Water Resources, shall conduct outreach to counties, cities, and relevant local agencies that are responsible for levees, flood-control facilities, and associated structures that may be vulnerable to impacts of the El Niño event to take appropriate actions to procure, maintain, stage, pre-position, distribute, and replenish flood-fight supplies, commodities, equipment, and materials necessary to support flood preparedness, response, and protective actions.
8. The Department of Water Resources, in coordination with the State Water Resources Control Board, shall conduct outreach and education to advance groundwater recharge projects and to use flood flows to recharge groundwater aquifers under existing law with the goal of reducing flood impacts and strengthening local water supplies.
9. Consistent with Paragraph 3 of this Proclamation, the Coastal Commission is directed to expedite review and action on proposed development by coastal communities to prepare for the impacts of this El Niño event.
Coastal communities are encouraged to submit permit applications, as appropriate, to facilitate timely Coastal Commission review, technical assistance, and other support for El Niño preparations. After an application is received, the Commission shall respond with notification of any incomplete items within five days. After an application is complete, it shall be scheduled for hearing at the next Commission meeting. For emergency permit requests, the Commission shall accept both written and oral requests to its district offices. When necessary to address an urgent need related to this emergency, the Commission shall take action on emergency permit requests as quickly as possible and within twenty-four hours of receipt.
10. The California Department of Transportation and California State Transportation Agency shall identify those state highways, bridges, culverts, drainage facilities, slopes, and other transportation infrastructure most at risk of flooding, erosion, debris flows, rockslides, mudslides, or other significant impacts from severe storms caused by the El Niño event, and transmit to the Governor’s Office of Emergency Services a prioritized list of projects to address such risks within 30 days of this Proclamation.
11. The California Department of Transportation shall develop plans to pre-position personnel and materials (including directional signage, traffic-control devices, road-closure devices, warning signs, delineators, emergency communications equipment, and other resources) at or near locations that may be identified as at risk of severe impacts from the El Niño event. This shall include plans to prepare and pre-position snow-removal, snow-control, and ice-control equipment as appropriate, including snowplows, snow blowers, graders, loaders, chain-control equipment, salt, sand, and other materials necessary to maintain safe travel and restore access on state highways during the El Niño event.
12. The Adjutant General and the California Military Department shall, in coordination with the Director of the Governor’s Office of Emergency 15 Services, identify California National Guard personnel, equipment, and capabilities that may be available to support state and local emergency operations, if activated or tasked, in relation to this El Niño event. Such planning shall include readiness for high-water vehicle operations; aviation operations, including reconnaissance, search and rescue, transport, and heavy-lift support, as appropriate; engineering support; emergency communications; transportation and logistics; evacuation support; flood-fight activities; debris removal and route clearance; commodity distribution; shelter support; and other life-safety and emergency-support missions.
13.California Volunteers, in coordination with the Governor’s Office of Emergency Services and other appropriate agencies, shall prepare to mobilize volunteers and trained service members, consistent with their training, mission, safety requirements, and applicable law, to support state and local preparedness, response, and recovery activities in connection with the El Niño event.
14. The California Conservation Corps shall prepare to deploy Corpsmembers, consistent with its statutory mission, training, available resources, safety requirements, and applicable law, to support severe weather preparedness and response activities in connection with the El Niño event.
15. The California Energy Commission, the Office of Energy Infrastructure Safety, and the State Water Resources Control Board and regional water quality control boards are directed, and the California Public Utilities Commission is requested, to coordinate, consistent with their respective authorities, with electrical, natural-gas, water, wastewater, telecommunications, transportation, and other critical-service providers to enhance readiness and support timely restoration of essential services following storm impacts.
16. The Governor’s Office of Emergency Services, in consultation with relevant state agencies, shall expand accessible, multilingual public preparedness communications related to severe weather, flooding, emergency alerts, evacuation readiness, power outages, safe travel, disaster assistance, and household emergency planning.
17.Agencies under my direct authority shall cooperate in their response to this emergency. Other agencies are requested to assist in responding to this emergency, as appropriate.
18. The restrictions set forth in Penal Code section 396, which are automatically triggered upon proclamation of a state of emergency, are suspended, and no such restrictions are imposed, with respect to this El Niño event, at this time.
I FURTHER DIRECT that as soon as hereafter possible, this Proclamation be filed in the Office of the Secretary of State and that widespread publicity and notice be given of this Proclamation.
This Proclamation is not intended to, and does not, create any rights or benefits, substantive or procedural, enforceable at law or in equity, against the State of California, its agencies, departments, entities, officers, employees, or any other person.
16 IN WITNESS WHEREOF I have
hereunto set my hand and caused
the Great Seal of the State of
California to be affixed this 21st day
of September 2026.
_________________________
GAVIN NEWSOM
Governor of California
ATTEST:
_____________________________
SHIRLEY WEBER, PH. D
Secretary of State
17 MANS CALIFORNI
City of Williams
810 E Street / P.O. Box 310 Williams CA 95987
Ph. (530) 235-3270 Fax (530) 473-2445
www.cityofwilliams.org
FOUNDED 1514
October S, 2026
Selection Committee
United States Senate Youth Program
RE: Yunen "Lupita" Rivera, Williams USD, Williams CA 95987 - Letter of Recommendation Dear Selection Committee,
It is my distinct pleasure to recommend Yunuen "Lupita" Rivera for the United States Senate Youth Program. Having served the City of Williams, California, for the past four years as a Councilmember, Mayor and now Mayor ProTem, I have worked with many fabulous young people. Lupita stands out because of her exceptional dedication to civic engagement, academic excellence and leadership.
Ms. Rivera currently serves as Chief of the "Jackets at City Hall", a youth civic program offered through a partnership between the City and the Williams Unified School District (WUSD). This program was established entirely because of Lupita's vision and initiative. At the age of 14, she reached out to me with a formal letter of interest and academic history, asking to intern with the city to learn how local government operates. Inspired by her maturity and desire to serve, I worked with my city staff and the WUSD to create the Jackets at City Hall program which launched in 2024. This program provides students with firsthand exposure about local government operations and allows them to participate in the civic processes.
Now in her third consecutive year as Chief, Lupita has been instrumental to the program's remarkable growth. Through her proactive recruitment efforts, student participation increased from nine students to
40. Rather than learning government from a classroom, these students are involved at city hall. Under Lupita's leadership, students meet with the Mayor, Mayor ProTem, City Manager and department heads, actively engage with their community and bring their parents to drive local civic awareness. A perfect example is Proposition 218 public hearing that drew over 100 people to a City Council meeting, an unprecedented level of participation for a community of our size.
Characterized by integrity, empathy, and an unwavering work ethic, Lupita embodies the ideals that the United States Senate Youth Program seeks to foster. I am confident that she will represent our state with distinction during Washington Week and continue on a path of impactful public service. recommendation without any reservation. Please contact me at I give my highest
[email protected] if you need any additional information.
Sincerely,
M.
Maria B. Leyva
Mayor Pro Tem, City of Williams
18 City of Williams DATE: October 21, 2026
City Council ITEM: 4.
Agenda Report CATEGORY: Communication
SUBJECT: Communication /Anti-Degradation Analysis Report BACKGROUND: This report has been prepared and submitted to the Regional Board. This report sets the stage for discussions to expand sewer treatment capacity.
DISCUSSION:
The WWTP provides tertiary treatment and discharges in accordance with the Notice of Applicability (NOA) No. R5-2023-0025-009 effective October 1, 2026, which is a renewal from its 2023 permit. This analysis was prepared to support the 2026 permit.
In 2021, the WWTP underwent facility upgrades, including replacement of all membrane sheaths on existing aeration diffuser tubes and the addition of another aeration diffuser tube assembly. These improvements increased the total design capacity of the aeration basin from
0.5 MGD to 0.7 MGD. All other WWTP processes can handle an ADWF of at least 1 MGD.
Therefore, the City desires to increase the permitted discharge capacity into Salt Creek to reflect the upgraded design capacity of 0.7 MGD. Accordingly, this Antidegradation Analysis has been prepared in accordance with the requirements of Title 40 of the Code of Federal Regulations Section 131.12 (40 CFR 131.12) and the California State Water Resources Control Board (SWRCB) Antidegradation Policy.
FISCAL IMPACT: existing engineering service contract
RECOMMENDATION: Information only – Receive and File
Attachment(s):
• Anti Degradation Report
Submitted by: Yvonne Kimball, City Manager
19 WATER/WASTEWATER CIVIL SURVEY STRUCTURAL ELECTRICAL MECHANICAL & PLUMBING INSTRUMENTATION & CONTROLS
(530) 244-0202 www.paceengineering.us
ANTIDEGRADATION ANALYSIS
WILLIAMS, CA
Prepared for:
City of Williams
Prepared by:
PACE Engineering, Inc.
20 CITY OF WILLIAMS
2290.20.500
ANTIDEGRADATION ANALYSIS
ENGINEER’S STATEMENT
This report was written by or under the direct supervision of:
______________________________________ Date: September 9, 2026 Laurie McCollum, PE, C 77274
Principal Engineer
9/9/26
21 i
TABLE OF CONTENTS
SECTION PAGE
1. INTRODUCTION ....................................................................................................................... 1
1.1 DISCHARGER DESCRIPTION............................................................................................. 1
1.2 PURPOSE OF ANALYSIS ................................................................................................... 1
2. ANTIDEGRADATION POLICY AND GUIDANCE.......................................................................... 2
2.1 FEDERAL ANTIDEGRADATION POLICY AND GUIDANCE.................................................. 2
2.2 STATE ANTIDEGRADATION POLICY AND GUIDANCE ...................................................... 3
2.2.1 RESOLUTION NO. 68-16 .................................................................................. 3
2.2.2 ADMINISTRATIVE PROCEDURES UPDATE 90-004........................................... 3
2.2.3 NEED FOR A COMPLETE ANTIDEGRADATION ANALYSIS ................................ 4
3. WATER QUALITY STANDARDS ................................................................................................. 5
3.1 BENEFICIAL USES............................................................................................................. 5
3.2 CRITERIA/OBJECTIVES ..................................................................................................... 6
4. WATER QUALITY ASSESSMENT................................................................................................ 6
4.1 ASSESSMENT APPROACH................................................................................................ 6
4.2 MASS BALANCE ASSESSMENT OF WATER QUALITY ....................................................... 8
4.3 INCREMENTAL CHANGE IN SALT CREEK WATER QUALITY AND EFFECTS AND BENEFICIAL USES ............................................................................................................ 8
4.3.1 INCREMENTAL CHANGES ................................................................................ 8
4.4 FINDINGS......................................................................................................................... 9 22 ii
TABLES
Table 1 – Effluent Limitations......................................................................................................... 7 Table 2 – Effluent Sampling Results (January 2020 - June 2026) ................................................... 7 FIGURES – AT END OF TEXT
Figure 1 – Location Map
Figure 2 – Monitoring Locations
Figure 3 – Effluent Electrical Conductivity
23 iii
ABBREVIATIONS
The following abbreviations are used in this report:
40 CFR 131.12 Title 40 of the Code of Federal Regulations Section 131.12 ADWF Average Dry Weather Flow
AMEL Average Monthly Effluent Limit
APU Administrative Procedures Update
BOD Biochemical Oxygen Demand
City City of Williams
County Colusa County
CVRWQCB Central Valley Regional Water Quality Control Board CV-SALTS Central Valley Salinity Alternatives for Long-Term Sustainability DDW Division of Drinking Water
EC Electrical Conductivity
GCID Glenn-Colusa Irrigation District
MCL Maximum Contaminant Level
MGD Million Gallons per Day
MGO Municipal General Order
NOA Notice of Applicability
NOV Notice of Violation
NPDES National Pollutant Discharge Elimination System
POTW Publicly Owned Treatment Work
PWWF Peak Wet Weather Flow
RWQCB Regional Water Quality Control Board
SWRCB State Water Resources Control Board
TSS Total Suspended Solids
USEPA United States Environmental Protection Agency
UV Ultraviolet
WDRs Waste Discharge Requirements
WQBEL Water Quality-Based Effluent Limit
WWTP Wastewater Treatment Plant
24 CITY OF WILLIAMS
ANTIDEGRADATION ANALYSIS
SEPTEMBER 2026
City of Williams 1
Antidegradation Analysis
1. INTRODUCTION
1.1 DISCHARGER DESCRIPTION
The City of Williams (City) owns and operates the Williams Wastewater Treatment Plant (WWTP) in Colusa County (County). The WWTP provides tertiary treatment and currently discharges in accordance with the Notice of Applicability (NOA) No. R5 2017-0085-008 (2017 NOA), effective August 1, 2019, and Waste Discharge Requirements (WDRs) Municipal General Order (MGO) No. R5-2023-0025. The Central Valley Regional Water Quality Control Board (CVRWQCB) recently completed renewing the discharge permit. The final updated NOA No. R5-2023-0025-009 (2023 NOA) has been provided by the CVRWQCB and will become effective October 1, 2026.
The analysis herein was completed to ensure continued compliance with the 2023 NOA.
The WWTP currently provides nitrification and denitrification for nitrogen removal and uses tertiary filtration followed by ultraviolet (UV) light for disinfection. The WWTP has a design capacity for an average dry weather flow (ADWF) of 0.70 million gallons per day (MGD), an average day maximum month flow of 1.08 MGD, and a peak wet weather flow (PWWF) of
2.32 MGD, with the ability to equalize a PWWF of up to 4.5 MGD. The WWTP is currently limited to a maximum permitted discharge of 0.5 MGD ADWF. The WWTP treats municipal wastewater and discharges effluent to Salt Creek, an ephemeral stream and a tributary of the Sacramento River.
1.2 PURPOSE OF ANALYSIS
In 2021, the WWTP underwent facility upgrades, including replacement of all membrane sheaths on existing aeration diffuser tubes and the addition of another aeration diffuser tube assembly. These improvements increased the total design capacity of the aeration basin from
0.5 MGD to 0.7 MGD. All other WWTP processes can handle an ADWF of at least 1 MGD.
Therefore, the City desires to increase the permitted discharge capacity into Salt Creek to reflect the upgraded design capacity of 0.7 MGD. Accordingly, this Antidegradation Analysis has been prepared in accordance with the requirements of Title 40 of the Code of Federal Regulations Section 131.12 (40 CFR 131.12) and the California State Water Resources Control Board (SWRCB) Antidegradation Policy.
25 City of Williams 2
Antidegradation Analysis
2. ANTIDEGRADATION POLICY AND GUIDANCE
Antidegradation policies and guidance have been issued at both the federal and state level, as described in the following sections.
2.1 FEDERAL ANTIDEGRADATION POLICY AND GUIDANCE
The federal antidegradation policy is designed to protect existing uses, to protect the level of water quality necessary to protect existing uses, and to protect higher quality and outstanding national water resources. The federal policy directs states to adopt a statewide policy that includes the following primary provisions; these provisions have since become used to classify water body quality as Tier 1, Tier 2, or Tier 3 waters (40 CFR 131.12):
1) Existing instream water uses and the level of water quality necessary to protect the existing uses shall be maintained and protected. [Tier 1] 2) Where the quality of waters exceed levels necessary to support propagation of fish, shellfish, and wildlife and recreation in and on the water, that quality shall be maintained and protected unless the State finds, after full satisfaction of the intergovernmental coordination and public participation provisions of the State’s continuing planning process, that allowing lower water quality is necessary to accommodate important economic or social development in the area in which the waters are located. In allowing such degradation or lower water quality, the State shall assure water quality adequate to protect existing uses fully. Further, the State shall assure that there shall be achieved the highest statutory and regulatory requirements for all new and existing point sources and all cost-effective and reasonable best management practices for nonpoint source control. [Tier 2] 3) Where high quality waters constitute an outstanding national resource, such as waters of national and State parks and wildlife refuges and waters of exceptional recreational or ecological significance, that water quality shall be maintained and protected. [Tier 3] 4) In those cases where potential water quality impairment associated with a thermal discharge is involved, the antidegradation policy and implementing method shall be consistent with Section 316 of the Act.
The United States Environmental Protection Agency (USEPA) Region 9 published Guidance on Implementing the Antidegradation Provisions of 40 CFR 131.12 (EPA 1987). The document 26 City of Williams 3
Antidegradation Analysis
provides general program guidance for states in Region 9 on developing procedures for implementing antidegradation policies.
Salt Creek does not constitute an outstanding national resource, and thermal discharge is not applicable in this situation. However, the creek does support propagation of fish, shellfish, and wildlife and recreation in and on the water; therefore, the water of Salt Creek is defined as Tier 2 water body quality and all applicable state and federal regulations shall apply.
2.2 STATE ANTIDEGRADATION POLICY AND GUIDANCE
2.2.1 Resolution No. 68-16
The SWRCB has interpreted Resolution No. 68-16 to incorporate the federal antidegradation policy (CVRWQCB 1998). Resolution No. 68-16 states, in part:
1) Whenever the existing quality of water is better than the quality established in policies as of the date on which such policies become effective, such existing high quality will be maintained until it has been demonstrated to the State that any change will be consistent with maximum benefit to the people of the State, will not unreasonably affect present and anticipated beneficial use of such water, and will not result in water quality less than that prescribed in the policies.
2) Any activity which produces or may produce a waste or increased volume or concentration of waste and which discharges or proposes to discharge to existing high quality waters will be required to meet waste discharge requirements which will result in the best practicable treatment or control of the discharge necessary to assure that (a) a pollution or nuisance will not occur and (b) the highest water quality consistent with maximum benefit to the people of the State will be maintained.
2.2.2 Administrative Procedures Update 90-004
In 1990, the SWRCB issued guidance to the Regional Water Quality Control Boards (RWQCBs) for implementing Resolution No. 68-16 in National Pollutant Discharge Elimination System (NPDES) permitting in Administrative Procedures Update (APU) 90-004. The guidance requires the RWQCBs to determine the need to make findings as to whether water quality degradation is permissible when balanced against benefit to the public. APU 90-004 describes two types of antidegradation analyses – a “simple” analysis and a “complete” analysis. 27 City of Williams 4
Antidegradation Analysis
2.2.3 Need for a Complete Antidegradation Analysis
A complete antidegradation analysis is required if the proposed activity results in:
1) A substantial increase in mass emissions of a pollutant, even if there is no other indication that the receiving waters are polluted; or
2) Mortality or significant growth or reproductive impairment of resident species.
In particular, an antidegradation finding [based on a complete analysis] should be made and, if necessary, an analysis should be conducted when performing the following permit activities:
1) Issuance of a permit for any new discharge, including Section 401 certifications; or 2) Material and substantial alterations to the permitted facility, such as relocation of an existing discharge; or
3) Reissuance or modification of permits which would allow a significant increase in the concentration or mass emission of any pollutant in the discharge.
A complete antidegradation analysis will not be required if:
1) A Regional Board determines that the reduction of water quality will be spatially localized or limited with respect to the water body; e.g., confined to the mixing zone; or 2) A Regional Board determines the reduction in water quality is temporally limited and will not result in any long-term deleterious effects on water quality; e.g., will cease after a storm event is over; or
3) A Regional Board determines the proposed action will produce minor effects which will not result in a significant reduction of water quality; e.g., a POTW has a minor increase in the volume of discharge subject to secondary treatment; or 4) A Regional Board determines that the proposed activity, which may potentially reduce water quality, has been approved in the General Plan of a political subdivision and has been adequately subjected to the environmental and economic analyses in an environmental impact report (EIR) required under the California Environmental Quality Act (CEQA). If the Regional Board finds the EIR inadequate, the Regional Board must supplement this information to support the decision.
The City is requesting to increase the permitted effluent ADWF from 0.5 MGD to 0.7 MGD based on compliance with end-of-pipe constituent concentration limits. The discharge is not 28 City of Williams 5
Antidegradation Analysis
believed to be adverse to the intent and purpose of the state and federal antidegradation policies. Specifically, effluent is treated to tertiary standards and dilution is not required to meet water quality-based effluent limits (WQBELs) as defined in the MGO. A simple antidegradation analysis is believed to be sufficient in this situation since the increase in discharge is not anticipated to result in a significant reduction of water quality.
3. WATER QUALITY STANDARDS
A water quality standard consists of 1) the designated beneficial uses of a water body to be protected, 2) adopted criteria designed to protect those uses, and 3) an antidegradation policy.
The federal and state antidegradation policies were presented in Section 2 above. The following sections describe the beneficial uses and water quality criteria applicable to the receiving water, i.e., Salt Creek.
3.1 BENEFICIAL USES
The beneficial uses of Salt Creek, a tributary to the Sacramento River via Freshwater Creek and the Colusa Basin within the Sacramento-Stone Corral watershed, are designated in the 2023 NOA.
Designated beneficial uses of Salt Creek include:
• Municipal and domestic supply
• Agricultural supply and stock watering
• Water contact recreation
• Warm freshwater habitat
• Wildlife habitat
• Warm water migration of aquatic organisms
• Spawning, reproduction, and/or early development
• Potential for cold freshwater habitat
Designated beneficial uses of the underlying groundwater include:
• Municipal and domestic supply
• Agricultural supply
• Industrial service supply
• Industrial process supply
29 City of Williams 6
Antidegradation Analysis
3.2 CRITERIA/OBJECTIVES
WQBELs adopted by the CVRWQCB can be found in the MGO. The MGO incorporates, by reference, the SWRCB Division of Drinking Water (DDW) maximum contaminant levels (MCLs) as objectives for water bodies designated for use as domestic, municipal, agricultural, and recreational water supplies.
4. WATER QUALITY ASSESSMENT
The following sections identify the degree to which the water quality would be lowered in Salt Creek by the proposed increase in discharge flow.
4.1 ASSESSMENT APPROACH
This assessment identifies the incremental change in water quality that would occur in Salt Creek due to increasing the WWTP ADWF permitted discharge from 0.5 MGD to 0.7 MGD.
To assess the water quality in Salt Creek, it is necessary to consider the beneficial uses and the objectives meant to protect those uses. Generally, water quality standards are concentration-based in order to prevent exceedances of concentration-based exposure thresholds.
Salt Creek experiences seasonal flows based on irrigation of the nearby rice fields and typically runs dry during the fall harvest season. At certain times of the year, Salt Creek is diverted by the Glenn-Colusa Irrigation District (GCID) into irrigation channels upstream of the WWTP discharge location, resulting in zero-flow conditions within the creek. Other times of the year, Salt Creek’s water quality could potentially be impacted by the GCID as Salt Creek flows through the diversion box at the GCID canal just upstream of the WWTP discharge location. Because flows upstream and downstream of the WWTP are not monitored, available dilution cannot be determined. Accordingly, effluent limitations in this Antidegradation Analysis are established at the point of discharge (end-of-pipe) to ensure compliance with water quality standards and protect the integrity of Salt Creek.
A review of all effluent sampling results between January 2020 and June 2026 as required by the 2017 NOA was completed as part of this assessment. Results of the effluent sampling were compared to the federal technology-based standards and WQBELs. WQBELs in the MGO were calculated assuming no dilution. In comparing the sample results to the WQBELs, no constituents were found to exceed the allowable limits; however, biochemical oxygen demand (BOD), total 30 City of Williams 7
Antidegradation Analysis
suspended solids (TSS), ammonia, nitrate plus nitrite, electrical conductivity (EC), and zinc had high enough levels to cause reasonable potential and are required to be monitored per the 2023 NOA. Refer to Table 1 for effluent limitations as included in the 2023 NOA and Table 2 for all sampling results from January 2020 through June 2026.
Table 1 – Effluent Limitations
Parameter Units Average
Monthly
Average
Weekly
Maximum
Daily
Annual
Average
BOD, 5-Day @ 20°C (BOD5) mg/L 10 15 - -
TSS mg/L 10 15 - -
Ammonia, Total (as N) mg/L 0.74 1.7 - -
Nitrate plus Nitrite, Total (as N) mg/L 10 17 - -
Zinc, Total Recoverable µg/L 140 - 280 -
EC µmhos/cm - - - 2,400
Table 2 – Effluent Sampling Results (January 2020 - June 2026) Parameter Units Average
Result
Maximum
Result
BOD, 5-Day @ 20°C (BOD5)
(1) mg/L 99 1,200
TSS mg/L 2 15
Ammonia, Total (as N)(1) mg/L 1.1 9.8
Nitrate plus Nitrite, Total (as N) mg/L 4.4 10
Zinc, Total Recoverable(2) µg/L - -
EC (annual average) µmhos/cm 1,815 1,900
Notes:
(1) Constituent result is above either the AWEL or the average monthly effluent limit (AMEL).
The City has since completed compliance actions and all results have since been well under effluent limits.
(2) Zinc was not required to be monitored under the 2017 NOA; therefore, no data is available.
As shown in Table 2, all sampled constituents with reasonable potential have been well within effluent limits since January 2020 except for BOD and ammonia. The City has received several Notices of Violation (NOVs) since 2020, all of which were for BOD, total coliform, and ammonia.
However, these have all since been addressed with the completion of a compliance project or other actions. All constituent results have been well within WQBELs since completion of those actions.
31 City of Williams 8
Antidegradation Analysis
4.2 MASS BALANCE ASSESSMENT OF WATER QUALITY
The 2017 and 2023 NOAs require the WWTP to monitor water quality of the undiluted effluent (EFF-001), water quality in Salt Creek 50 feet upstream of the effluent discharge point (RSW-001), and water quality in Salt Creek 200 feet downstream of the effluent discharge point (RSW-002).
Refer to Figure 1 for a location map of the City and the WWTP and Figure 2 for monitoring locations. The associated water quality data is recorded as included in the monitoring and reporting requirements in the 2017 NOA. The data for all these monitoring results is available via the SWRCB’s California Integrated Water Quality System Project and is not included herein but can be provided upon request. Flow data upstream and downstream of the discharge point is not available via the WWTP, California Data Exchange Center, or United States Geological Survey; therefore, a mass balance could not be performed and assimilative capacity could not be calculated.
4.3 INCREMENTAL CHANGE IN SALT CREEK WATER QUALITY AND EFFECTS
AND BENEFICIAL USES
The following sections describe the incremental change in Salt Creek water quality that would result from the increased WWTP discharge and the effect of the incremental changes.
4.3.1 Incremental Changes
Under the design flow scenario of the 2023 NOA, in which Salt Creek flow is zero, the creek water quality is the same as the effluent quality. The incremental change in constituent concentrations due to increasing the WWTP effluent would be zero; therefore, no further degradation would occur from a constituent concentration basis.
When there is creek flow, however, there would be some change to creek water quality downstream of the discharge. A true mass balance could not be performed without receiving water flow data. Of the constituents with reasonable potential, only EC is of concern for potentially exceeding the effluent limit. EC is a known issue in the entire Central Valley area. The City is participating in the Prioritization and Optimization Study underway by the Central Valley Salinity Alternatives for Long-Term Sustainability (CV-SALTS) Group. A comparison of all average weekly concentrations of EC at RSW-001 to RSW-002 is presented in Figure 3. The diagonal line represents when the EC concentrations upstream and downstream of the WWTP discharge location are equal. The area above the diagonal line represents when the concentration of EC at RSW-002 is higher than at RSW-001. The area above the horizontal line represents when the concentration of EC has exceeded the average annual effluent limit of 2,400 µmhos/cm. As shown 32 City of Williams 9
Antidegradation Analysis
in Figure 3, while many data points slightly exceed the equal EC concentration line, none are close to the effluent limit. The elevated EC concentrations at RSW- 002 that were significantly higher occurred either when WWTP pond water was recycled through the WWTP for a short period, the WWTP received wastewater from Arbuckle Public Utility District, or the start of the rice irrigation season resulted in RSW-002 EC being high when effluent EC remained unchanged. These elevated data points are not representative of typical WWTP operations. All data points taken during typical operations show effluent EC does not significantly affect RSW-002.
4.4 FINDINGS
Based on the simple antidegradation analysis contained herein, it is determined that the WWTP currently operates, and will continue to operate in the future, to meet the highest statutory and regulatory NOA requirements to assure that a water quality nuisance will not occur and that beneficial uses are fully protected. The City will continue to participate in the CV-SALTS Prioritization and Optimization Study to ensure future EC reduction strategies are implemented.
Increasing the permitted discharge ADWF from 0.5 MGD to 0.7 MGD is not expected to exceed the current constituent concentrations and will not significantly impact the water quality of Salt Creek. 33 FIGURES
34 Source: Esri, Vantor, GeoEye, Earthstar Geographics, CNES/Airbus DS, USDA, USGS, AeroGRID, IGN, and the GIS User Community Pow 147
148
151
101
151B
101A
151A
5 3
4 8
1 7
6 2
9 88 89
92 84
39 40
83 82 81
51 17
70 72
79 69
37 27 28
10 11
71 60
59 38
96 33
24 95
85 86 25
26 15
31 18
14 43
62 29
30 46
32 45
19 21
80 20
47 76
50 98
34 36
56 99
48 61
22 23
55 49
91 41A
143
98A
39A
62A
127
126
86A
44A
12A
14A
13A
11A
10A
56B
415
435
436
438
440
294
293
434
431
430
432
427 425 424 423
422
420 414
411
113
214
189
138
112
172
171
267
111
291
290
289
105
170
100
226
19A
247
239
242
225
150
118
120
124 123
121
233
149
219
270
258
207
256
235
236
186
266
257
173
221
102
206
140
285
97A
292
177
230
241
229
141
107
276
187
216
231
133
288
131132
218 182
103
223
139
263
249
117
115
114
265
287
213
109
204
175
198
146
152
245
272
115A
138B
141B
173E
173I
422A
138C
103A
102A
118A
107A
192A
172B
42 73
52 41
53 13
67 44
35 16
64 54
94 90
73A
43A
64A
60A
61A
15A
23A
69A
180
37A
97B
35A
55A
56A
437
439
429
428
426
421
413
412
202
215
262
144
260
201
185
248
174
222
274
106
275
240
190
51A
271
228
108
259
176
134
128
130
188
279
280
200
195
191
237
194
212
211
129
104
135
193
203
50A
125
243 246
179
210
273
209
261
254
136
251
250
264
119
252
253
178
217
255
244
183
286
269
184
110
116
137 199
181
197
196
153
192
268
277
234
227
232
224
205
208
238
220
105A
173A
173B
173C
173D
173F
173G
173H
429A
428A
178A
177A
141A
152A
124A
138A
131B
129A
130A
130B
172A
263A
263B
180A
179A
267A
182A
143A
20"
12"
18"
8"
10"
6" 8" 6"
10"
6"
10"
6"
12"
8"
10"
8"
6"
6"
10"
8"
8"
6"
10"
8"
8"
6"
8"
10"
6"
10"
8"
10" 8"
8"
6"
6"
8"
6"
10"
6"
8" 6"
8"
10"
6"
12"
8"
8" 6"
8"
10"
8"
8" 12"
6"
6"
10"
10"
8" 6"
6"
10"
8"
8"
6"
8"
6"
8"
8"
8" 6"
8" 6"
6"
8"
6"
6"
8"
6"
8"
12" 6"
10"
10"
10" 8"
8" 8"
6"
8"
8" 6"8"
6"
6"
6"
8"
6" 8" 8"
6"
6"
8"
8"
8"
6"
6" 6"
8"
6"
6"
8"
6" 8"
6" 6"
8"
6" 8" 6" 8"
8"
8"
8"
8"
6" 6"
6"
10" 8"
12"
6" 8"
6"
10" 8"
6"
6" 6"
8" 8"
8"
6"
8" 8"
8"
8" 8"
6"
6"
8"
6"
8"
12"
8"
6"
8"
6"
6"
8"
8"
8"
10"
10"
6" 6"
6" 6"
8"
6"
6"
6" 6"
8"
8"
6"
6"
8"
8"
10"
10"
8"
6"
6"
6" 8" 8"
8"
6"
6"
6"
20"
8"
10"
12"
10"
8" 8"
8"
8"
8"
8"
6"
6"
10"
6"
8"
6"
10"
10"
8"
6"
10" 6" 6" 6"
8"
10" 6"
8"
10" 10"
6"
8"
8"
20"
6"
8"
8"
6"
12" 8" 8"
8"
6"
8"
6"
8"
8"
6"
6"
10" 8"
NORTH ST
BELLE WAY
10TH ST 10TH ST
9TH ST
8TH ST 8TH ST
7TH ST
7TH ST
6TH ST
5TH ST 5TH ST
4TH ST
7TH ST
INTERSTATE 5
INTERSTATE 5
RUGGERI WAY
VANN ST
CUPPELO DR
LINCOLN RD
BUTTE VIEW DR
GOLDEN VALLEY DR
SIERRA OAKS DR
WHITE OAK DR TEAL WAY
GREENWING DR WATERFOWL WAY
ELLA ST
MARGUERITE ST
E ST E ST E ST
E ST
WESTGATE DR
I ST I ST
H ST
G ST
F ST
F ST
H ST
A ST
B ST
C ST
D ST NICOLAUS DR BRENDA WAY
6" FM
6" FM
8" FM
8" FM
8"
12 20A
20B
SPHERE OF INFLUENCE
WWTP
WWTP OUTFALL
TO SALT CREEK
CITY OF WILLIAMS
CITY LIMITS
NORTH STREET
LIFT STATION
PD LIFT
STATION VANN STREET
LIFT STATION
MARGUERITE STREET
LIFT STATION
PETO STREET
LIFT STATION
FLOW
FIGURE 1
JOB #2290.20
8/2026
DATE CITY OF WILLIAMS
LOCATION MAP
1 IN =
0 3,000 6,000
3,000 FT
35 SALT CREEK
RSW-002
EFF-001
SALT CREEK WWTP FIGURE 2 DATE: 08/2026 JOB #2290.20 CITY OF WILLIAMS MONITORING LOCATIONS 0 1 IN = 200 FT 200 400 RSW-001
Spie Name: MiLand Profects 12290.20 do-Needed WW Ops Sericesio CAD TaskalAnt-Deg Viguresaing, Layout: FIGURE 2
GCID WWTP
CANAL
200 400 Plot Date: August 07, 2026 - 9:27 am Login Name: akuykendall 1 IN = 200 FT
FIGURE 2
PACE CITY OF WILLIAMS
DATE: 08/2026
ENGINEERING MONITORING LOCATIONS
JOB #2290.20
FIGURE 3
0 500
1,000
1,500
2,000
2,500
3,000
0 500 1,000 1,500 2,000 2,500 3,000
RSW-002
RSW-001
Effluent Electrical Conductivity [umhos/cm]
Weekly
Measurements
Non-Compliance Zone
as an annual average
Increase in EC
Decrease in EC
WWTP pond water
was recycled and
WWTP received
Arbuckle wastewaterP
Elevated RSW-002 EC
likely due to surrounding
agricultural activities
37 City of Williams DATE: October 21, 2026
City Council ITEM #: 5.
Agenda Report CATEGORY: Public Hearing
SUBJECT: Hold public hearing introduce and waive Ordinance 282-26 amending Chapter
15.33 of the City of Williams Municipal Code by setting forth an expedited, streamlined permitting process for electric vehicle charging stations as required by Government Code Section 65850.7.
BACKGROUND:
Assembly Bill 1236, which amended Government Code Section 65850.7 to require jurisdictions with a population less than 200,000 residents to establish procedures for expedited, streamlined processes for permitting electric vehicle charging stations. The amendments to Section 65850.7 include the requirement for a jurisdiction to adopt an ordinance for the expedited, streamlined process. The ordinance shall include the requirement that a jurisdiction adopt a checklist of requirements with which a permit application for an electric vehicle charging station will be eligible for expedited review.
This process includes the establishment of a checklist containing objective requirements for the installation of an electric vehicle charging station and a process for electronic submittal of permit applications. The content of the checklist requires the permit applicant to check the features of the existing electrical service such as rating in amperes, system voltage, connected or calculated load, spare capacity in amperes, voltage and ampere rating of the electric vehicle supply equipment, circuit rating of the electric vehicle supply equipment, location of the electric vehicle supply equipment, if ventilation is/or is not required, and clearances of the charging equipment to comply with all applicable building and fire safety laws. The checklist also assists the applicant in confirming that the location of the electric vehicle supply equipment will comply with any vehicle clearance requirements in the City’s / County’s Zoning Ordinance. Section 65850.7 requires that the City’s / County’s checklist may be based on the “Plug-In Electric Vehicle Infrastructure Permitting Checklist” of the “Zero-Emission Vehicles in California: Community Readiness Guidebook” of the Governor’s Office of Planning and Research.
Assembly Bill 1236 (2015) also clarifies that a jurisdiction shall not condition approval of a permit for an electric vehicle charging station based on the approval of an association as defined in California Civil Code, Section 4080, for example, a homeowner association (HOA)
Staff recommends that City Council introduce and waive first Reading the attached ordinance, given Government Code Section 65850.7’s requirement that local agencies adopt such an ordinance to create an expedited, streamlined permitting process for electric vehicle charging stations. Most of the procedures, such as electronic submittal of plans are currently in place and comply with the requirements of the Assembly Bill and staff is assuring that successful implementation of an expedited, streamlined process will be available to permit applicants.
DISCUSSION:
Concurrent with Council’s adoption of the ordinance, staff, is taking the measures to meet all requirements of Assembly Bill 1236 (2015). This includes finalizing the application checklist in conjunction with the “Plug-In Electric Vehicle Infrastructure Permitting Checklist” of the “Zero-Emission Vehicles in California: Community Readiness Guidebook”, measures for electrical 38 compliance, and standard items for fire prevention safety. Building and Fire inspection staff are also developing procedures for expedient and thorough inspection of the electric vehicle charging stations. Our City rarely processes standing -alone EV charging stations applications.
Adopting this ordinance does not impact city operations in a negative manner.
FISCAL IMPACT:
There is no immediate financial impact or budget action necessary as a result of the recommended action.
RECOMMENDED ACTION:
Hold public hearing, introduce and waive the first reading of Ordinance No. 282-26 an Ordinance amending Chapter 15.33 of the City of Williams Municipal Code by setting forth an expedited, streamlined permitting process for electric vehicle charging stations as required by Government Code Section 65850.7.
Attachments:
Draft Ordinance 282-26
Sample Check list
Prepared and submitted by: Katheryn Ramsaur
Reviewed by: Yvonne Kimball, City Manager
39 ORDINANCE NO. 282-26
AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF WILLIAMS, CALIFORNIA, AMENDING TITLE 15 OF THE WILLIAMS MUNICIPAL CODE BY ADDING CHAPTER 15.33, “ELECTRIC VEHICLE STREAMLINING AND EXPEDITED PERMITTING,” SETTING FORTH PROCEDURES FOR AN
EXPEDITED, STREAMLINED PERMITTING PROCESS FOR ELECTRIC VEHICLE
CHARGING STATIONS
WHEREAS, the State of California and the City of Williams have consistently promoted and encouraged the use of fuel-efficient electric vehicles; and WHEREAS, the State of California adopted Assembly Bill 1236 (Chapter 598, Statutes of 2015), codified at California Government Code Section 65850.7, which requires cities and counties to adopt an ordinance creating an expedited, streamlined permitting process for electric vehicle charging stations; and
WHEREAS, creation of an expedited, streamlined permitting process for electric vehicle charging stations will facilitate convenient charging of electric vehicles, promote the use of electric vehicles, and help reduce the City's reliance on environmentally damaging fossil fuels, while continuing to protect public health and safety; and WHEREAS, the City Council desires to combine the administrative and technical provisions recommended by the State's model ordinances for small jurisdictions into a single, unified chapter of the Williams Municipal Code;
NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF WILLIAMS DOES ORDAIN AS FOLLOWS:
SECTION 1.
This Ordinance shall be known as the “City of Williams Electric Vehicle Streamlining and Expedited Permitting Ordinance.” The terms, phrases, and words used in this Ordinance shall be construed in compliance with the definitions set forth in California Government Code Section 65850.7.
SECTION 2. Chapter 15.33 is hereby added to Title 15 of the Williams Municipal Code to read as follows:
Chapter 15.33
ELECTRIC VEHICLE STREAMLINING AND EXPEDITED PERMITTING
40 Sections:
15.33.010 Purpose.
15.33.020 Definitions.
15.33.030 Expedited, streamlined permitting process.
15.33.040 Application requirements — applicant verification.
15.33.050 Permit application processing.
15.33.060 Electronic submittals.
15.33.070 Association approval prohibited as a condition of approval.
15.33.080 Technical review — use permit for specific, adverse impact.
15.33.090 Installation requirements.
15.33.010 Purpose.
The purpose of this Chapter is to promote and encourage the use of electric vehicles by creating an expedited, streamlined permitting process for electric vehicle charging stations, while promoting public health and safety and preventing specific, adverse impacts in the installation and use of such charging stations. This Chapter implements California Government Code Section 65850.7.
15.33.020 Definitions.
For purposes of this Chapter:
(a) “Electric vehicle charging station” or “charging station” means any level of electric vehicle supply equipment station that is designed and built in compliance with Article 625 of the California Electrical Code, as it reads on the effective date of this Chapter, and that delivers electricity from a source outside an electric vehicle into a plug-in electric vehicle.
(b) “Specific, adverse impact” means a significant, quantifiable, direct, and unavoidable impact, based on objective, identified, and written public health or safety standards, policies, or conditions as they existed on the date the application was deemed complete. (c) “Electronic submittal” means the utilization of one or more of the following: (1) electronic mail or email; (2) the internet; or (3) facsimile.
15.33.030 Expedited, streamlined permitting process.
Consistent with Government Code Section 65850.7, the Building Official shall implement an expedited, streamlined permitting process for electric vehicle charging stations and shall adopt a 41 checklist of all requirements with which electric vehicle charging stations shall comply in order to be eligible for expedited review. The expedited review process and checklist may refer to the recommendations contained in the most current version of the “Plug-In Electric Vehicle Infrastructure Permitting Checklist” of the “Zero-Emission Vehicles in California: Community Readiness Guidebook,” as published by the Governor's Office of Planning and Research. The City's adopted checklist shall be published on the City's website.
15.33.040 Application requirements — applicant verification.
Prior to submitting an application for processing, the applicant shall verify that the installation of the electric vehicle charging station will not have a specific, adverse impact on public health and safety and building occupants. Verification by the applicant includes, but is not limited to:
electrical system capacity and loads; electrical system wiring, bonding, and overcurrent protection; building infrastructure affected by charging station equipment and associated conduits; and the location of charging station equipment and vehicle parking.
15.33.050 Permit application processing.
A permit application that satisfies the information requirements in the City's adopted checklist shall be deemed complete and shall be promptly processed. Upon confirmation by the Building Official that the permit application and supporting documents meet the requirements of the City's adopted checklist and are consistent with all applicable laws and health and safety standards, the Building Official shall, consistent with Government Code Section 65850.7, approve the application and issue all necessary permits. Such approval does not authorize an applicant to energize or utilize the electric vehicle charging station until final approval and inspection are completed by the City. If the Building Official determines that the permit application is incomplete, the Building Official shall issue a written correction notice to the applicant detailing all deficiencies in the application and any additional information required to render the application complete and eligible for expedited permit issuance.
15.33.060 Electronic submittals.
Consistent with Government Code Section 65850.7, the Building Official shall allow for electronic submittal of permit applications covered by this Chapter and associated supporting documentation. In accepting such permit applications, the Building Official shall also accept electronic signatures on all forms, applications, and other documentation in lieu of a wet signature by any applicant.
15.33.070 Association approval prohibited as a condition of approval. 42 Consistent with Government Code Section 65850.7, the Building Official shall not condition approval of any electric vehicle charging station permit on the approval of such system by an association, as that term is defined in Civil Code Section 4080.
15.33.080 Technical review — use permit for specific, adverse impact.
It is the intent of this Chapter to encourage the installation of electric vehicle charging stations by removing obstacles to permitting for charging stations, so long as doing so does not supersede the Building Official's authority to address higher-priority life-safety situations. If the Building Official makes a finding, based on substantial evidence, that an electric vehicle charging station could have a specific, adverse impact upon the public health or safety, as defined in this Chapter, the City may require the applicant to apply for a use permit.
15.33.090 Installation requirements.
(a) Electric vehicle charging station equipment shall meet the requirements of the California Electrical Code, the Society of Automotive Engineers, the National Electrical Manufacturers Association, and accredited testing laboratories such as Underwriters Laboratories, and the rules of the Public Utilities Commission or a municipal electric utility regarding safety and reliability.
(b) Installation of electric vehicle charging stations and associated wiring, bonding, disconnecting means, and overcurrent protective devices shall meet the requirements of Article 625 and all other applicable provisions of the California Electrical Code. (c) Installation of electric vehicle charging stations shall be incorporated into the load calculations of all new or existing electrical services and shall meet the requirements of the California Electrical Code. Electric vehicle charging equipment shall be considered a continuous load.
(d) Anchorage of floor-mounted or wall-mounted electric vehicle charging stations shall meet the requirements of the California Building Code or California Residential Code, as applicable to the occupancy, and the provisions of the manufacturer's installation instructions. Mounting of charging stations shall not adversely affect building elements.
SECTION 3.
Any provision of the Williams Municipal Code, or appendices thereto, inconsistent with the provisions of this Ordinance, to the extent of such inconsistencies and no further, is hereby repealed or modified to the extent necessary to effect the provisions of this Ordinance.
SECTION 4.
43 If any section, subsection, sentence, clause, or phrase of this Ordinance is for any reason held to be invalid or unconstitutional by a decision of any court of competent jurisdiction, such decision shall not affect the validity of the remaining portions of this Ordinance. The City Council hereby declares that it would have passed this Ordinance, and each and every section, subsection, sentence, clause, or phrase thereof, not declared invalid or unconstitutional, without regard to whether any other portion of the Ordinance would be subsequently declared invalid or unconstitutional.
SECTION 5.
The Mayor shall sign, and the City Clerk shall attest to, the passage of this Ordinance. The City Clerk shall cause this Ordinance, or a summary thereof, to be published once in a newspaper of general circulation within the City within fifteen (15) days after its adoption. This Ordinance shall take effect thirty (30) days after its adoption.
PASSED AND ADOPTED by the City Council of the City of Williams, California, at a regular meeting held on the 21st day of October, 2026, by the following vote:
AYES:
NOES:
ABSENT:
ABSTAIN:
_____________________________
Kate Dunlap, Mayor
ATTEST:
_____________________________
Mariana Pineda, City Clerk
APPROVED AS TO FORM:
_____________________________
Andreas Booher, City Attorney
44 1
City or County of _______________
Residential and Non-Residential AB 1236 / AB 970 Checklist for Permitting Electric Vehicle Charging Stations (EVCS)
This checklist is limited to health and safety requirements only, pursuant to Government Code sections 65850.7 (AB 1236) and 65850.71 (AB 970).
Note on Timelines (AB 970):
Applications will be reviewed for completeness within:
• 5 business days (1–25 EVCS)
• 10 business days (26+ EVCS)
Approval will be issued within:
• 20 business days (1–25 EVCS)
• 40 business days (26+ EVCS)
• Unless a specific adverse impact on public health or safety is identified.
This checklist must be completed and submitted with the building permit application for expedited review under AB 1236 and AB 970.
Job Address: _______________________________________________ Permit No. _______________
Project Type (check one):
☐ Single-Family ☐ Multi-Family (Apartment) ☐ Multi-Family (Condominium) ☐ Commercial (Single Business) ☐ Commercial (Multi-Business) ☐ Industrial ☐ Mixed-Use ☐ Right-of-Way (Curbside/on-street; public or private)
☐ Other _________________
Location of EVSE (check one):
☐ Garage ☐ Parking Level(s) ☐ Parking Lot ☐ Street Curb ☐ Other: ____ Description of Work:
______________________________________________________________ ____________________________________________________________ ______________________________________________________________ ____________________________________________________________ 45 2
Applicant Name:
Applicant Phone & Email:
Contractor Name: License Number & Type:
Contractor Phone & Email:
Owner Name:
Owner Phone & Email:
Required Documents
The following documents are required for complete application:
☐ Completed permit application
☐ Manufacturer specifications and cut sheets for EVSE
☐ Electrical plan or single-line diagram
☐ Load calculation or panel schedule (per California Electrical Code Article 220)
☐ Site plan showing EVSE location
☐ Accessibility documentation (if subject to any accessibility requirements, such as California Building Code Chapter 11B)
EVSE Information
Charging Level: ☐ Level 1 (120V) ☐ Level 2 (240V) ☐ Level 3 - DC Fast Charge (standard or high power, including Megawatt Charging Systems [MCS])
Nameplate Rating: ___________ kW Voltage: ___________ V Manufacturer & Model______________________________________ V EVSE Maximum Continuous Output Current (per manufacturer specifications/cut sheet): _____________Amps
Mounting Type: ☐ Wall Mount ☐ Pedestal ☐ Pole Mounted ☐ Other:
__________
46 3
Electrical Service Information
System Voltage: ☐ 120/240V, 1ϕ, 3W ☐ 120/208V, 3ϕ, 4W ☐ 277/480V, 3ϕ, 4W ☐ Other: _______________
Rating of Existing Main Service: ___________ Amps
Rating of Panel Supplying EVSE (if different): ___________ Amps Proposed EVSE Circuit Rating: ___________ Amps / ___________ Poles EVSE Continuous Load Calculation (Branch Circuit Sizing):
EVSE Continuous Load (from EVSE Information above):
__________________ Amps × 1.25 = ___________ Amps (minimum required branch-circuit ampacity)
Ampacity of EVSE Conductors = # ___________ AWG or kcmil AIC Rating of EVSE Circuit Breaker (if not single-family or service is 400A or larger): __________ A.I.C. (or verify with Inspector in field) Existing Electrical Load & Capacity
Select one method:
☐ Documented Maximum Demand Load (from utility) = ___________ Amps
☐ Calculated Load using CEC Article 220 Optional Method (220.82 or 220.83) = ___________ Amps
☐ Connected Load of existing panel/service = ___________ Amps Total Load (Existing + EVSE Load): ___________ Amps
For Single-Family Dwellings Only: If existing load data is not available from the utility or other approved methods, submit a load calculation in accordance with the California Electrical Code Article 220 using either the Optional Calculation for Dwelling Units (220.82 or 220.83) or the Determining Existing Loads method (220.87). The EVSE load shall be calculated as a continuous load. The calculation must demonstrate that the existing service has adequate capacity for the proposed EVSE plus all other loads.
47 4
Acknowledgment
I certify that the information provided is true and accurate. I understand that this application is subject to review limited to applicable health and safety standards.
Applicant Signature: _____________________ Date: ________________ Printed Name: _________________________________________ 48 City of Williams DATE: October 21, 2026
City Council ITEM: 6.
Agenda Report CATEGORY: Consent
SUBJECT: Consent
RECOMMENDED ACTION
It is Recommended that Council Approve the following:
• Approve the Minutes of the Regular City Council Meeting of September 16, 2026 Submitted by: Mariana Pineda, City Clerk
Attachments: (1)
49 City of Williams
City Council Minutes
810 E Street/P.O. Box 310, Williams, CA 95987
CITY COUNCIL
COUNCIL CHAMBERS
WEDNESDAY, SEPTEMBER 16, 2026
OPEN SESSION
6:00 PM
CALL TO ORDER: Mayor Dunlap called the regular meeting to order at 6:00 pm.
ROLL CALL: Council Members present, Don Parsons, Kate Dunlap, Maria Belmontes Leyva, Alfred Sellers, Jr., and John Troughton, Jr.
PLEDGE OF ALLEGIANCE: Mayor Dunlap invited everyone to join her in the Pledge of Allegiance.
PUBLIC COMMENT
No public comment at this moment.
Mayor Dunlap welcomed Jackets at City Hall and asked Mayor Pro Tem Belmontes Leyva to please introduce the participants that were present.
Mayor Pro Tem Belmontes Leyva explained that this was the third year the local high school students participated in this program. Some of the topics that are covered are Administration, Policy, Planning, Public Works, Parks and Recreation, Communication, and Public Outreach. Mayor Pro Tem Belmontes Leyva asked the students that as she calls their name to please come up to the front so that a picture can be taken.
Lupita Rivera Rivera, Fernanda Alcaraz Velazquez, Zylia Bueno, Andrea Bustamante Ruiz, Airam Cano Ruvalcaba, Antonio Carabeo Zamudio, Fernando Cervantes Jr., Cristal Pelayo, Alberto Cortez, Valentina Esparza Rivera, Jaqueline Esqueda, Ethan Figueroa, Kyle Fontino, Emma Gandara, Jimena Gomez, Alberto Gonzalez Romero, Leonel Hernandez- Martínez, Evelin Iniguez Cano, Alexis Jaime, Abby Jimenez, Anthony Jimenez Jauregui, Emely Jimenez Jauregui, Natalie Jimenez Jauregui, Santiago Leos Velazquez, Delia Lopez-Hernandez, Esmeralda Medina Herrera, Jonathan Mora Ruiz, Darielle Navarro, Alexza Ortiz, Yelenny Ortiz, Ellyana Ramos, Esmeralda Ramos, Jozaiah Rivera-Mendez, Ashley Rodriguez, Jocelyn Rodriguez Ferrer, Juan Ruiz Patino, Aaron Sillas Rodriguez, Maria Trejo Trejo, Sally Uribe and Sophia Velasquez.
Mayor Pro Tem Belmontes Leyva stated that a report from the Jackets at City Hall would be given during reports towards the end of the agenda.
50 2
PRESENTATION
1. Receive a presentation on Pioneer Community Energy’s (Pioneer) planned service launch into the City of Williams in October 2027.
DSICUSSION: Lisa Rhoads, with Pioneer Community Energy, gave the City Council and the public a presentation with an update on Pioneer.
Council Member Sellers, Jr., asked if there was an option or does everyone have to be on board with this.
Lisa explained that they did have an option and were able to opt out at anytime.
Council Member Parsons asked about the A/C Tuneup Program.
Mrs. Rhoads stated that the customers could have any HVAC company to go out and do the tuneup and it would be one hundred percent reimbursable.
After a lengthy discussion City Council thanked Mrs. Rhoads and went on to consider the next item on the agenda.
ACTION: No action needed at this time.
WRITTEN COMMUNICATIONS
2. Acknowledge Leases with Lamar Central Outdoor for two billboards located on Crawford Road.
3. Receive and file Engineer’s update on the E Street Water and Sewer Improvement Project and Acknowledge Intent to Advertise for Construction Bids.
DISCUSSION: City Manager stated these are informational items only. No action is needed.
ACTION: No action needed at this time.
CONSENT
4. Approve the Minutes of the Regular City Council Meeting of August 19, 2026.
5. Waive the second reading and adopt Ordinance 280-26, a Zoning Ordinance Amendment addressing sign maintenance and abandoned sign removal.
6. Waive the second reading and adopt Ordinance 278-26, an Ordinance Amendment allowing 2 ADUs on any property if the open space permits it.
7. Designate the City Manager as City Liaison to the Colusa County Chamber of Commerce Board of Directors. [Requested by the Chamber of Commerce]
8. E- Street Complete Streets Project program Supplement Agreements (PSA)s:
51 3
Resolution No. 26-28 Accepting Caltrans Program Supplement Agreement (PSA) No. 00000 B 043 in the amount of $9,141,000 in Active Transportation Program funds and Authorize City Manager as authorized signer.
Resolution No. 26-29 Accepting Caltrans Program Supplement Agreement (PSA) No. 00000 B066 in the amount of $200,000 in Active Transportation Program funds for the non-infrastructure component of the E Street Complete Streets Project and authorizing the City Manager to execute the agreement on behalf of the City.
DISCUSSION: Council Member Parsons requested to pull item 9 from the consent calendar for discussion.
Mayor Dunlap asked if there was any public comment. With no public comment, City Council took the following action.
ACTION: Mayor Pro Tem Belmontes Leyva made a motion, seconded by Council Member Parsons, to approve consent agenda items 4 through 8. Motion passed 5-0 by the following roll-call vote:
AYES: Council Members Parsons, Belmontes Leyva, Dunlap, Sellers, Jr., Troughton, Jr.
NOES: None.
ABSTAIN: None.
ABSENT: None.
9. Consideration of the financial hardship request by property owner of 547 7th Street and approve Resolution No. 26-30 Authorizing a onetime payment arrangement for Utility Connection and related charges associated with 545 7th Street.
DISCUSSION: Finance Director Greenbaum explained that this item was before Council because this business was found to not be in compliance. The business does not have a water or sewer connection. In order to be compliant, they will need to connect to city water and sewer. Staff has received a letter of hardship from the business owner and were requesting to have their costs deferred with a payment plan. Staff is working with the business owner and the first step would be for City Council to approve this. It would be the owner’s responsibility to connect to the city system.
Staff’s recommendation is for City Council to approve this request and authorize staff to work with the business owner and defer the cost no longer than five years.
Mayor Pro Tem Belmontes Leyva asked for clarification on why the owner would not be responsible for the sewer connection fee. Mr. Greenbaum explained that at a point in time there was a connection there already and they would not be responsible for the connection fee. They would be responsible to have a plumber connect their line back into the city’s system.
Council Member Troughton, Jr., asked if there would be different fees for different volumes of water that would be requested by the business. Finance Director explained that because it is a small business it would be a standard amount. If any other fees are incurred, then the City would charge the owner, and the estimated amount is about two thousand dollars just for the waterline.
Council Member Parsons stated that before City Council can approve this the owner needs to be connected to the sewer because if they are to have running water, that water needs somewhere to go. 52 4
Council Member Parsons believes they should be taking steps to be compliant before Council can consider approving this.
Mr. Greenbaum said he believes that if City Council does not approve this, then the owners will not be able to move forward because they don’t have the money upfront to cover these costs.
Mayor Pro Tem Belmontes Leyva asked if in order for them to move forward, they are requesting a payment plan for the fees listed. Mr. Greenbaum stated that was correct.
Mayor Dunlap stated that when this was discussed with the Finance Committee there were questions about whether there were other businesses in the same situation. Mr. Greenbaum stated that he believed they were the only ones not connected. Mayor Dunlap reiterated that the terms of the payment plan would be to pay the City back within five years.
Mayor Pro Tem Belmontes Leyva stated she would like for the City to consider placing a lien on the property so that in the future the City is not left with this bill.
City Attorney Booher stated that could possibly be an option, but he would have to look more into it.
Mayor Dunlap stated she would like for the Finance Committee and City Council to review any agreement the City enters with the business owner.
ACTION: Mayor Pro Tem Belmontes Leyva made a motion, seconded by Council Member Sellers, Jr., to have this item tabled to next month’s meeting. Motion passed 5-0 by the following roll-call vote:
AYES: Council Members Parsons, Belmontes Leyva, Dunlap, Sellers, Jr., Troughton, Jr.
NOES: None.
ABSTAIN: None.
ABSENT: None.
OLD BUSINESS
10. Receive Treasurers Investment Report and Monthly Register for July 2026; Monthly Financial Status Report as of July 2026.
DISCUSSION: Finance Director gave the treasurers report for the month ending July 2026.
The Finance Director presented the report, including updated economic overview of financial information as of July 2026.
Mr. Greenbaum also reviewed updates to sales tax and transient occupancy tax (TOT) revenues. Sales tax revenues came in at approximately 101% of budget for the fiscal year and are currently trending above budget. TOT revenues ended the year higher than expected as well, with a surplus reported.
Mr. Greenbaum stated that revenues and expenditures are generally in line with the approved budget, and the City’s cash position remains stable, with enough liquidity to cover anticipated expenses for at least the next six months.
A preliminary summary of the E Street Project was included for informational purposes, with staff noting it is an early look at project costs and funding sources. 53 5
Council received the report and had the opportunity to ask questions.
Council Member Troughton, Jr., asked if General Fund money would be necessary in part or whole if the contingency is not used.
Mr. Greenbaum said that was a very good question. He stated that the way ATP Grant works is that the City’s match is used first.
Mayor Dunlap asked if there were any other questions from Council or from the public.
With no further comments City Council moved to consider the new business items.
ACTION: No action needed at this time.
NEW BUSINESS
11. Discuss and consider the translation of the City Council Agenda to Spanish.
DISCUSSION: City Manager Kimball explained that at the last City Council Meeting, Mayor Pro Tem Belmontes Leyva requested for City Council to consider having the agenda translated to Spanish. This was brought up in recent legislation which is Senate Bill 707. However the City of Williams is not required under SB 707. There was a discussion amongst staff and felt that the best way to approach this is to translate it unofficially. Bilingual City staff would be translating and we will add a disclaimer that the translation is provided as a courtesy.
Mayor Pro Tem Belmontes Leyva said she believes this is a good idea because of the demographics of the City’s population. She stated she personally likes staff’s recommendation of providing informal translation of the agenda. This would save the City from having to hire a professional translator, but still provide the information necessary to the Spanish-speaking community.
After clarification from staff that the only pages that would be translated would be the agenda City Council took the following action.
ACTION: Council Member Parsons made a motion, seconded by Council Member Belmontes Leyva to begin the translation of the City Council agenda to Spanish. Motion passed 5-0 by the following roll-call vote:
AYES: Council Members Parsons, Belmontes Leyva, Dunlap, Sellers, Jr., Troughton, Jr.
NOES: None.
ABSTAIN: None.
ABSENT: None.
12. Adopt Resolution 26-31, Construction Management award to Webster Engineering for the E Streets Complete Streets Project.
DISCUSSION: City Manager Kimball presented this item regarding the award of a Professional Services Agreement for construction management, inspection, and contract administration services for 54 6
the E Street Complete Streets Project. The project includes roadway reconstruction, ADA improvements, bike lanes, drainage work, and other related improvements along E Street.
Mrs. Kimball stated there had been a review of all proposals received and Webster Engineering scored the highest. After that review the Finance Director and the City Manager met with Webster Engineering to negotiate. She stated that the Finance Director was an excellent negotiator. Staff was able to clarify the scope and were able to reduce the total cost.
With that Mrs. Kimball stated that staff is very comfortable recommending that City Council award contract to Webster Engineering for the construction management of the E Street Complete Streets Project.
Mayor Dunlap thanked Finance Director Greenbaum and Mrs. Kimball for the negotiations of the cost savings in over two hundred and twenty-three thousand dollars.
Council Member Troughton, Jr., pointed out that the staff report stated the E Street Project went from Husted Road to Sunset Road and said he believed that the E Street Project was from Eighth Street to Sunset Road.
Police Chief Miller explained that it lists all the way to Husted because it involves some road striping.
ACTION: Council Member Troughton, Jr, made a motion, seconded by Council Member Sellers, Jr., to Adopt Resolution 26-31, Construction Management award to Webster Engineering for the E Streets Complete Streets Project. Motion passed 5-0 by the following roll-call vote:
AYES: Council Members Parsons, Belmontes Leyva, Dunlap, Sellers, Jr., Troughton, Jr.
NOES: None.
ABSTAIN: None.
ABSENT: None.
13. Resolution No. 26-32, Award construction contract for wastewater collection improvement project to Ranger Pipelines, Inc. in the amount of $3,608,377.00 including the base amount plus Alternate B. [Fully funded by a Clean Water Grant]
DISCUSSION: City Manager Kimball presented the Wastewater Collection System Improvement Project and the proposed award of the construction contract. The project will replace approximately 8,300 feet of deficient wastewater pipeline mains and laterals and is funded through the State Water Resources Control Board Clean Water State Revolving Fund.
Mrs. Kimball explained that the City received seven bids for the project, with Ranger Pipelines, Inc. submitting the lowest responsive and responsible bid. The base bid was $3,567,877.00. Staff recommended awarding the contract to Ranger Pipelines, Inc. for the base bid plus Additive Alternate B, which includes the rehabilitation of five deficient manholes throughout the City, for a total contract amount of $3,608,377.00.
Staff stated that the City had been awarded a grant in the amount of $5,458,000 and that no City funds are required for completion of the project, including construction contingency.
City Manager invited Laurie McCollum with PACE Engineering to give City Council a bit more information on this project.
55 7
Mrs. McCollum thanked City Council for the opportunity to speak on this project. She stated that this project included about eighty-three hundred linear feet of pipeline replacement of the City’s sewer collections system, to include the main lines, laterals and a manhole. The bids came in and the numbers looked very good. The City received bids from seven different contractors. Laurie stated that five of those seven had come in with very close amounts and the lowest responsive and responsible bidder was found to be Ranger Pipelines, with a total bid amount of $3,608,377.00. This would be one hundred percent grant funded by the Clean Water State Revolving Fund and the bid actually came in a little lower than the grant funding award. This also leaves a bit over twenty percent contingency in case unanticipated issues come up.
Council Member Parsons asked Laurie if they had already worked with Ranger Pipelines.
She said that they have not yet, but as part of their bid package they had to list past sample projects.
They have very similar projects to this one and they completed past projects well and had no reason to believe they were not prepared for this project.
ACTION: Council Member Belmontes Leyva made a motion, seconded by Council Member Troughton, Jr., to approve, Resolution No. 26-32, Award construction contract for wastewater collection improvement project to Ranger Pipelines, Inc. in the amount of $3,608,377.00 including the base amount plus Alternate B, Authorize the City Manager to execute the construction contract and related documents on behalf of the City, subject to Ranger’s timely submission of the required performance bond, payment bond, insurance certificates, and executed contract agreement and Authorize the City Manager, or designee, to execute and administer the construction contract and other documents necessary to implement the Project and funding agreement. [Fully funded by a Clean Water Grant] Motion passed 5-0 by the following roll-call vote:
AYES: Council Members Parsons, Belmontes Leyva, Dunlap, Sellers, Jr., Troughton, Jr.
NOES: None.
ABSTAIN: None.
ABSENT: None.
14. Review and accept the FY 2024-2025 audited financial statements, including Single Audit Reports performed in accordance with Government Auditing Standards, and accept the annual reports for Transaction and Use Taxes and Transient Occupancy Taxes as required per Municipal Code Section 3.18.120.
DISCUSSION: Finance Director Greenbaum explained that this is the Fiscal Year 2024-2025 Audit report. Mr. Greenbaum stated that the city had received a clean and unqualified report. This would make it the 17th year in a row that the City has received a clean audit.
Mr. Greenbaum explained that for the fiscal year ended June 30, 2025, MUN CPAs reported two findings related to internal control and accounting procedures. This was the firm’s second year serving as the City’s independent auditors, and additional review procedures were performed as part of the transition. The two findings were reported as significant deficiencies. The auditors did not report any material weaknesses. None of the findings resulted in a material misstatement of the City’s total revenues, total expenditures, fund balance or overall net position. 149 These findings, which are detailed on pages 9 – 12 of the Single Audit report.
The first-year audit they had a finding which identified a presentation issue related to the accounting treatment of long-term loans receivable. The City appropriately recorded interest revenue only on 56 8
active loans that were making payments. Under the modified accrual basis of accounting, interest associated with nonperforming or inactive loans must be recorded as a deferred inflow of resources.
The required audit adjustment reclassified amounts between loan receivables and deferred inflows of resources to properly reflect unavailable interest in accordance with governmental accounting standards. The adjustment had no effect on total fund balance or overall net position. Finding 2024- 001 Loans Receivable was implemented and cleared by the auditors as City is now properly accounting for deferred inflows with their loans. The other findings had to do with the Grant and Tax Receivable Accruals which was implemented and cleared and Net Pension Liability Calculations was partially implemented and included with the current year finding.
Sales taxes for the year ending June 30, 2025, decreased by $76,193 or 4.2% from FY2024. Looking at sales taxes over a two-year period we can see that sales taxes decreased by $675,567 or 27.8% from FY2023. Overall, the large decrease in sales taxes is attributed to a decline in spending from the previous two years which had been temporarily increased by spending attributed to the pandemic stimulus. Sales taxes in Williams are very volatile and will fluctuate from year to year because a large portion of our sales taxes are derived from gasoline sales. Increases and decreases will fluctuate based on demand and fluctuating gas prices and changing consumer spending patterns.
Mr. Greenbaum explained that the Transient occupancy taxes for the year ending June 30, 2025, totaled $430,276, a decrease of $71,418 or 14.2% from the $501,694 received in FY2024. Looking back over a two-year period, we see that transient occupancy taxes have decreased by $98,008 or
18.6% from the $528,284 received in FY2023. The larger FY2023 transient occupancy revenues can be attributed to a surge in travel due to pent up demand caused by the pandemic. As pandemic related restrictions eased, in FY2022 and FY2023 people tended to travel more as a release to being cooped up at home. The leveling off in FY2024 and FY2025 is due to normalizing travel patterns more consistent with pre-pandemic trends.
ACTION: Council Member Belmontes Leyva made a motion, seconded by Council Member Troughton, Jr., to accept the FY 2024-2025 audited financial statements, including Single Audit Reports performed in accordance with Government Auditing Standards, and accept the annual reports for Transaction and Use Taxes and Transient Occupancy Taxes as required per Municipal Code Section 3.18.120. Motion passed 5-0 by the following roll-call vote:
AYES: Council Members Parsons, Belmontes Leyva, Dunlap, Sellers, Jr., Troughton, Jr.
NOES: None
ABSTAIN: None.
ABSENT: None.
15. Adopt Resolution No. 26-33, Authorizing the Regional Early Action Planning (REAP) 2.0 Grant Funding Allocation for the City of Williams E Street Complete Streets Project, and approve a Funding Sub-Recipient Memorandum of Understanding with the County of Colusa.[Grant amount approximately $2.4 million]
DISCUSSION: Finance Director Greenbaum thanked City Council for giving him the opportunity to present this. He state he was pretty happy to present this because the City has been working hard on trying to fund the E Street Project. This will help reach the completion of that project. Staff found out fairly recently that there is a possible $2.4 million dollars available in the Early Action Planning Program. This funding was originally provided to the County of Colusa, but the County’s original planned uses, approved by the Board of Supervisors on December 20, 2022, did not come to fruition. 57 9
This funding does come with very tight deadlines, all eligible expenditures must be expended by December 31, 2026. The City of Williams is a sub-recipient of the County of Colusa and need to have a Memorandum of Understanding in place. City staff have been in contact with the County and the utilization of the E Street Project was approved on August 4, 2026. Mr. Greenbaum stated the City had already requested a drawdown of almost $1.6 million dollars.
It is staff’s recommendation that City Council approve the allocation and acceptance of up to $2,406,513.04 of Regional Early Action Planning Grants available through the County of Colusa for the Williams “E” Street Corridor Improvements, approve and authorize execution of the Memorandum of Understanding (“MOU”) between the County of Colusa and the City of Williams and, adopt Resolution 26-33 authorizing the MOU and the use of the funds for eligible project expenditures; and authorize the City Manager, or designee, to execute documents and take administrative actions necessary to implement the MOU.
Mayor Dunlap stated she wanted to thank and recognize all the work that has been going into this and commended Finance Director for all his hard work. Mayor Dunlap also thanked Supervisor Boes for making the city aware of this opportunity.
ACTION: Council Member Troughton, Jr., made a motion, seconded by Council Member Parsons, to, Adopt Resolution No. 26-33, Authorizing the Regional Early Action Planning (REAP) 2.0 Grant Funding Allocation for the City of Williams E Street Complete Streets Project, and approve a Funding Sub-Recipient Memorandum of Understanding with the County of Colusa.[Grant amount approximately $2.4 million]. Motion passed by 5-0 by the following roll-call vote:
AYES: Council Members Parsons, Belmontes Leyva, Dunlap, Sellers, Jr., Troughton, Jr.
NOES: None.
ABSTAIN: None.
ABSENT: None.
16. Accept Cal OES $250,000 Cybersecurity Grant Award, approve a total project budget of $357,143 including $107,143 in required City matching funds, and Authorize staff to determine project funding allocations between the Water and Sewer Enterprises Funds.
DISCUSSION: City Finance Director presented this item to City Council. He mentioned that this was another grant that PACE Engineering had helped with as well.
This grant requires a 30% local match of the total project cost. This equates to a total project budget of $357,143 ($250,000 grant plus $107,143 match). This funding is to strengthen cybersecurity capabilities and address vulnerabilities within local government infrastructure. The City intends to use the grant funding to focus on critical water and sewer systems and address needed cybersecurity and security infrastructure improvements that will enhance the City's ability to protect utility systems, data, operations, and critical services.
Council Member Troughton, Jr., asked what fund the 30% local match would be coming out of. Mr.
Greenbaum stated that the =y would come from the water and sewer fund.
Council Member Parsons aske Mrs. McCollum if she knew the risk that the City is at regarding cybersecurity.
Mrs. McCollum said it was hard to say but there is a risk. She stated that looking at the others agencies they work with, the City is in the middle but with the step that will be taken with this grant the City will be better off.
58 10
After further explanation and discussion on this grant, City Council took the following action.
ACTION: Council Member Sellers, Jr., made a motion, seconded by Council Member Belmontes Leyva, to, accept Cal OES $250,000 Cybersecurity Grant Award, approve a total project budget of $357,143 including $107,143 in required City matching funds, and Authorize staff to determine project funding allocations between the Water and Sewer Enterprises Funds. Motion passed 5-0 by the following roll-call:
AYES: Council Members Parsons, Belmontes Leyva, Dunlap, Sellers, Jr., Troughton, Jr.
NOES: None.
ABSTAIN: None.
ABSENT: None.
REPORTS
Jackets at City Hall- Ethan Figueroa gave City Council an update and reported that the program has now forty participants. He stated they had had their first meeting with the City Manager and the Finance Director. Ethan stated this meeting was very insightful.
Council Member Parsons- attended regular meetings. He also attended the swearing in ceremony for the new Sheriff of Colusa County.
Mayor Pro Tem Belmontes Leyva – attended regular meetings. She also attended the Jackets at City Hall earlier during the morning.
Council Member Sellers, Jr.- attended regular meetings. Attended the car show that took place at Grocery Outlet.
Council Member Troughton, Jr.- attended regular meetings.
Mayor Dunlap – attended all of her regular commission and committee meetings.
STAFF GENERAL REPORTS AND DISCUSSION:
City Attorney- Nothing additional to report
City Manager-Mrs. Kimball gave City Council an update on all the projects that are going on within the City.
Police Chief Miller- gave an update on the Police Department.
Fire Chief – was absent.
Finance Director- gave an update on the Finance Department.
City Planner Ramsaur- was absent, but City Manager gave City Council an update on the Planning Department.
59 11
CLOSED SESSION:
1. CONFERENCE WITH LABOR NEGOTIATORS (Gov’t. Code Sec. 54957.6) Agency designated representatives: City Attorney, Andreas Booher Employee Organization: City Manager
ADJOURNMENT:
Mayor Dunlap reconvened to open session at 8:44p.m. No reportable action was taken.
Mayor Dunlap adjourned the meeting at 8:44p.m.
Kate Dulap, Mayor
_____________________________
Mariana Pineda, City Clerk
60 City of Williams DATE: October 21, 2026
City Council ITEM: 7.
Agenda Report CATEGORY: Consent
SUBJECT: Local Governing Body Designation for the FFY 2024 Cybersecurity Grant BACKGROUND: This is a requirement by the Grantor, Cal OES following the acceptance of the $250,000 Cybersecurity Grant.
DISCUSSION:
The City Council officially accepted the Cybersecurity Grant at the September 2026 council meeting.
Following the acceptance, Cal OES, the grantor, required that the City adopt a “designation” resolution to officially designate the City Manager or Designee to execute necessary paperwork related to the grant fund.
The Cybersecurity Grant originally had a 20% local matching requirement. City staff was able to waive the requirement.
FISCAL IMPACT: none
RECOMMENDATION: Adopt Resolution 26-34
Attachment(s):
Resolution 26-34
Submitted by: Yvonne Kimball, City Manager
61 Governing Body Resolution
BE IT RESOLVED BY THE
(Governing Body)
OF THE THAT
(Name of Applicant)
, OR
(Name or Title of Authorized Agent)
, OR
(Name or Title of Authorized Agent)
,
(Name or Title of Authorized Agent)
is hereby authorized to execute for and on behalf of the named Applicant, a public entity established under the laws of the State of California, any actions necessary for the purpose of obtaining federal financial assistance provided by the federal Department of Homeland Security and subgranted through the State of California for the following Grant Award:
(List Grant Year and Program)
Passed and approved this day of , 20
Certification
I, , duly appointed and
(Name)
Of the
(Title) (Governing Body)
do hereby certify that the above is a true and correct copy of a resolution passed and approved by the
day of ,20
(Official Position)
(Signature) (Date)
CITY COUNCIL
CITY OF WILLIAMS
21ST OCTOBER 26
CITY ENGINEER, DAVE HARDEN
CITY MANAGER, YVONNE KIMBALL
FFY 2024 STATE AND LOCAL CYBERSECURITY GRANT
KATE DUNLAP
MAYOR CITY COUNCIL
21ST OCTOBER 26
Resolution 26-34
62 Attachment D – Signature Authority Form 2020
AS THE
(Secretary/Director/President/Chancellor/Chairperson)
OF THE
(Name of the Organization)
I hereby authorize the following individual(s) to execute for an on behalf of the named organization, any actions necessary for the purpose of obtaining federal financial assistance provided by the federal Department of Homeland Security and subgranted through the California Governor’s Office of Emergency Services.
OR
OR
Signed and approved this day of 20
(Signature)
MAYOR
CITY COUNCIL OF THE CITY OF WILLIAMS
CITY MANAGER, YVONNE KIMBALL
21ST OCTOBER 26
63 City of Williams DATE: October 21, 2026
City Council ITEM: 8.
Agenda Report CATEGORY: Consent
SUBJECT: City Council Designates the City Manager as the authorized representative for Water Manganese Mitigation project
BACKGROUND: This is a requirement by the Grantor, California Department of Water Resources to apply for a $2 Million water safety grant.
DISCUSSION:
At the September 2026 council meeting, the City Council authorized staff and PACE Engineering to proceed with applying for a Water safety grant. In order to proceed with the application, the Dept. of Water Resources required that the City Council formally authorize the City Manager to execute necessary paperwork related to the grant.
FISCAL IMPACT: none
RECOMMENDATION: Adopt Resolution 26-35
Attachment(s):
Resolution 26-35
Submitted by: Yvonne Kimball, City Manager
64 AUTHORIZED REPRESENTATIVE RESOLUTION
RESOLUTION NO: 26-35
WHEREAS the City of Williams has determined there is necessity to seek financial assistance from the State of California for making improvements to the water system to minimize manganese in the City’s drinking water.
RESOLVED BY THE City Council of the City of Williams (the “Entity”), AS FOLLOWS:
The City Manager (the “Authorized Representative”) or designee is hereby authorized and directed to sign and file, for and on behalf of the Entity, a Financial Assistance Application for a financing agreement from the State Water Resources Control Board for the planning, design, and construction of Manganese Mitigation Project (the “Project”).
This Authorized Representative, or his/her designee, is designated to provide the assurances, certifications, and commitments required for the financial assistance application, including executing a financial assistance agreement from the State Water Resources Control Board and any amendments or changes thereto.
The Authorized Representative, or his/her designee, is designated to represent the Entity in carrying out the Entity’s responsibilities under the financing agreement, including certifying disbursement requests on behalf of the Entity and compliance with applicable state and federal laws.
Ayes
Nos
CERTIFICATION
I do hereby certify that the foregoing is a full, true, and correct copy of a resolution duly and regularly adopted at a meeting of the City of Williams City Council held on October 21st, 2026. (Name, Signature, and Seal of the Clerk or Authorized Record Keeper of the Governing Board of the Agency) 65 City of Williams DATE: October 21, 2026
City Council ITEM: 9.
Agenda Report CATEGORY: Consent
SUBJECT: Consider Approval of Non-Voting Membership in California Municipal Public Financing Authority and Corresponding Authorization to Execute Non-Voting Member Agreement
EXECUTIVE SUMMARY
This report recommends approval of Non-Voting Membership in CalMuni PFA, a statewide joint powers authority established to help California public agencies plan and execute capital financings in a competitive, disciplined, and cost-effective manner.
Non-Voting Membership carries no cost, no financial obligation, and no commitment to undertake any financing transaction. It simply positions the Agency on a proven statewide platform that provides access to competitive capital markets, long-term fiscal modeling tools, and pooling capabilities — all of which become immediately available upon adoption of the resolution and execution of a two-page member agreement.
BACKGROUND
CalMuni PFA was established in 2020 as a statewide joint powers authority under California’s Marks-Roos Local Bond Pooling Act. It is governed by a board of senior public-sector officials and is designed exclusively to serve California public agencies. It operates as a public financing platform — not a lender, vendor, or financial product.
Behind the platform are two advisory firms with a combined 60+ years of California public finance experience:
• Weist Law — 35+ years as bond and tax counsel, with billions in completed California public finance transactions and an unblemished default record across every matter on which the firm has opined.
• CalMuni Advisors — 25+ years in municipal advisory services, financial modeling, pension management, and program technology, including the proprietary PFA 360 analytical platform.
Member agencies access the full capabilities of this platform upon joining — at no cost and with no obligation to proceed with any transaction.
WHAT IS CALMUNI PFA?
CalMuni PFA provides a standing public financing infrastructure that agencies may use when capital needs arise. Core capabilities include:
• Revenue bond issuance, installment sale agreements, and loan financings — under a single public legal framework.
66 • Competitive market access — every financing goes through a disciplined RFP process distributed to 50+ institutional lenders for private placements, or approximately 15 top-tier underwriters for public offerings. No exclusive bank relationships. No predetermined pricing. • Pooled financings — the Marks-Roos framework allows multiple agencies to combine projects into a single larger bond transaction, achieving economies of scale and reduced issuance costs that no small agency can replicate independently. Each agency retains separate allocation of proceeds and bears no cross-liability for others’ obligations. • PFA 360 — the platform’s proprietary 25-year fiscal modeling engine, which integrates an agency’s financial statements, existing debt covenants, capital improvement plan, CalPERS pension projections, rate studies, and grant opportunities into a living roadmap updated in real time. Agencies routinely pay $30,000–$100,000+ for comparable analysis independently. • Long-term advisory relationship — ongoing engagement, not transactional. The team learns the Agency’s financial profile, CIP, and community context before a financing need becomes urgent.
MEMBERSHIP TERMS AND CONDITIONS
Non-Voting Membership in CalMuni PFA is governed by the Non-Voting Member Agreement (Exhibit A). Key terms include:
Membership Cost None. No application fee, no annual dues, no retainer.
Financial Obligation None. Membership does not obligate the Agency to any financing transaction.
Cross-Liability None. The Agency bears no liability for any other member agency’s obligations.
Voting Rights Non-Voting Membership. The Agency does not serve on or vote as part of the Authority’s governing board.
Duration Ongoing. The Agency may terminate membership at any time by written notice.
Approvals Required Adoption of this Resolution and execution of the Non-Voting Member Agreement. No further approvals are required for membership itself.
Future Financings Any financing transaction through CalMuni PFA will be subject to separate board approval at the time of the transaction. .
STRATEGIC RATIONALE
Staff recommends approval of Non-Voting Membership for the following reasons:
• Positions the Agency to move efficiently when capital needs arise. Agencies that join the platform before a financing need becomes urgent are better positioned to act quickly and obtain favorable terms.
67 • Provides access to institutional-grade fiscal planning and modeling at no cost. The PFA 360 platform offers analytical depth that the Agency could not otherwise obtain without significant outside consulting expenditures.
• Enables access to pooled financings. For agencies with smaller individual project needs, pooling with other PFA members can meaningfully improve financing terms and reduce issuance costs.
• Delivers a long-term advisory relationship. The platform is designed for ongoing engagement, not one-time transactions. The advisory team will develop knowledge of the Agency’s financial structure, capital plan, debt obligations, and pension exposure over time – creating a foundation for better decisions across multiple financing cycles.
• Carries no risk or downside. Because membership imposes no financial obligation and may be terminated at any time, the Agency assumes no risk by joining. There is no cost to joining. The only meaningful cost is the cost of “not joining” — the foregone access to platform capabilities, market competition, and advisory resources that become available upon membership.
FISCAL IMPACT
There is no fiscal impact associated with approval of Non-Voting Membership. No fee, dues, or other financial consideration is required to join or maintain membership in CalMuni PFA. Any future financing transaction proposed to be conducted through the Authority will be brought to the City Council for separate consideration and approval. No transaction may be consummated without independent City Council authorization.
ALTERNATIVES
1. Do not approve membership in the California Municipal Financing Authority.
RECOMMENDEDATION
Staff recommends that City Council adopt Resolution No. 26-36, approving Non-Voting Membership of City of Williams in the California Municipal Public Financing Authority (“CalMuni PFA”) and authorizing the City Manager to execute a Non-Voting Member Agreement with CalMuni PFA.
ATTACHMENTS
• Exhibit A — Non-Voting Member Agreement
• Exhibit B — Resolution No. 26-36 (Approving Non-Voting Membership) • Exhibit C — CalMuni PFA Overview and Platform Description 68 NON-CHARTER MEMBERSHIP AGREEMENT
1 NON-CHARTER MEMBERSHIP AGREEMENT
by and between the
CALIFORNIA MUNICIPAL PUBLIC FINANCING AUTHORITY
and the
City of Williams
This NON-CHARTER MEMBERSHIP AGREEMENT, dated as of October 21, 2026, is by and between THE CALIFORNIA MUNICIPAL PUBLIC FINANCING AUTHORITY (“CalMuni PFA”) and the CITY OF WILLIAMS, a California municipal corporation (the “City”).
W I T N E S S E T H:
WHEREAS, certain public agencies of the State of California (collectively, the “Charter Members”) have entered into a Joint Powers Agreement Creating the California Municipal Public Financing Authority (the “Agreement”), establishing CalMuni PFA and prescribing its purposes and powers, and providing, among other things, for qualifying public agencies to become non-charter members of CalMuni PFA (each a “Non-Charter Member”); and WHEREAS, CalMuni PFA has been formed for the purpose, among others, of exercising any powers common to the Charter and Non-Charter Members, including but not limited to acquiring, constructing, improving, operating, leasing and disposing of real property for a public purpose, all as specified in the Agreement, and to exercise the additional powers granted to it in the Act (as defined in the Agreement) and any other applicable provisions of the laws of the State of California; and
WHEREAS, CalMuni PFA has been established pursuant to the Agreement and the Act and is empowered to issue or execute non-recourse debt, which may include bonds, notes, commercial paper or any other evidences of indebtedness, leases, installment sale or other financing agreements or certificates of participation therein (herein “Obligations”), and to otherwise undertake financing programs under the Act or other applicable provisions of the laws of the State of California to accomplish its public purposes; and WHEREAS, the City desires to become a Non-Charter Member of CalMuni PFA; and WHEREAS, the Board of Directors of CalMuni PFA (the “Board”) has determined that the City should become a Non-Charter Member of CalMuni PFA; and NOW, THEREFORE, in consideration of the above premises and of the mutual promises herein contained, CalMuni PFA and the City do hereby agree as follows:
69 NON-CHARTER MEMBERSHIP AGREEMENT
2 Section 1. Non-Charter Member Status. The City is hereby made a Non-Charter Member of CalMuni PFA for all purposes of the Agreement and the Bylaws of CalMuni PFA, the provisions of which are hereby incorporated herein by this reference. From and after the date of execution and delivery of this Non-Charter Membership Agreement by the City and CalMuni PFA, the City shall be and remain a Non-Charter Member of CalMuni PFA.
Section 2. Restrictions and Rights of the City. The City shall not have the right, as a Non-Charter Member of CalMuni PFA, to vote on any action taken by the Board. In addition, no officer, employee or representative of the City shall have any right to become an officer or director of CalMuni PFA by virtue of this Non-Charter Membership Agreement.
Section 3. Effect of Prior Actions. The City hereby agrees to be subject to and bound by all actions previously taken by the City Council to the same extent as the Members of CalMuni PFA are subject to and bound by such actions.
Section 4. No Obligations of the City. The debts, liabilities and obligations of CalMuni PFA shall not be the debts, liabilities and obligations of the City.
Section 5. Execution of this Non-Charter Membership Agreement. Execution of this Non-Charter Membership Agreement shall satisfy the requirements of Section 12 of the Agreement and Article VI of the Bylaws of CalMuni PFA for participation by the City in all programs and other undertakings of CalMuni PFA, including, without limitation, any undertaking to finance the acquisition, construction, installation and/or equipping of public capital improvements, and any other financing program undertaken by CalMuni PFA.
IN WITNESS WHEREOF, the parties hereto have caused this Non-Charter Membership Agreement to be executed by their proper officers thereunto duly authorized, on the day and year first set forth above.
CALIFORNIA MUNICIPAL PUBLIC
FINANCING AUTHORITY
By:
CITY OF WILLIAMS
By:
Yvonne Kimball, City Manager
70 RESOLUTION NO. 26-36
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF WILLIAMS
APPROVING A NON-CHARTER MEMBERSHIP IN THE CALIFORNIA
MUNICIPAL PUBLIC FINANCING AUTHORITY AND AUTHORIZING
EXECUTION OF A NON-VOTING MEMBER AGREEMENT
WHEREAS, the California Municipal Public Financing Authority (the “Authority” or “CalMuni PFA”) is a joint powers authority duly organized and existing under that certain Joint Exercise of Powers Agreement dated as of June 24, 2020 (the “JPA Agreement”), and pursuant to Article 1 (commencing with Section 6500) of Chapter 5 of Division 7 of Title 1 of the Government Code of the State of California (the “Act”); and
WHEREAS, CalMuni PFA is authorized pursuant to Article 4 (commencing with Section 6584) of the Act, commonly known as the Marks-Roos Local Bond Pooling Act of 1985 (the “Bond Pooling Act”), to issue bonds, notes, certificates of participation, and other evidences of indebtedness, and to enter into installment sale agreements, loan agreements, and other financing arrangements for public purposes on behalf of member agencies; and WHEREAS, CalMuni PFA operates as a statewide public financing platform through which member agencies may access competitive capital markets, participate in pooled financings, utilize the Authority’s analytical and advisory resources, and execute both individual and coordinated capital financings; and
WHEREAS, under the Bond Pooling Act and the JPA Agreement, agencies may participate in CalMuni PFA as Non-Voting Members, which entitles them to access the Authority’s platform and financing capabilities without incurring any financial obligation, cross-liability to other member agencies, or commitment to undertake any specific financing transaction; and
WHEREAS, the City Council of the City of Williams (the “Agency”) has determined that it is in the public interest to become a Non-Voting Member of CalMuni PFA in order to access the Authority’s financing platform, preserve future financing optionality, and position the Agency to efficiently execute capital improvements and infrastructure projects as the need arises; and WHEREAS, Non-Voting Membership requires only the adoption of this Resolution and execution of a Non-Voting Member Agreement, and does not require payment of any fee, dues, or other financial consideration, nor does it obligate the Agency to participate in any financing transaction; and
WHEREAS, the form of the Non-Voting Member Agreement (the “Member Agreement”) has been presented to this City Council and is on file with the City Clerk; and WHEREAS, this City Council has duly considered the matter and finds it in the best interest of the Agency and the public it serves to approve Non-Voting Membership in the Authority on the terms and conditions set forth herein.
71 2
NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Williams as follows:
Section 1. Recitals. The City Council hereby specifically finds and declares that each of the recitals set forth above are true and correct.
Section 2. Approval of Non-Voting Membership. The Agency is hereby authorized and directed to become a Non-Voting Member of the California Municipal Public Financing Authority. The City Council hereby finds that such membership serves a valid public purpose and is in the best interests of the Agency and the community it serves.
Section 3. Approval Non-Charter Membership Agreement. The form of the Non-Voting Member Agreement on file with the City Clerk is hereby approved. The City Manager is hereby authorized and directed to execute and deliver the Non-Voting Member Agreement, together with such additions, changes, or modifications thereto as an Authorized Officer may deem necessary or advisable, provided that any such additions, changes, or modifications shall not materially alter the terms thereof. Execution of the Non-Voting Member Agreement by an Authorized Officer shall be conclusive evidence of the City Council’s approval of any such additions, changes, or modifications.
Section 4. Authorization of Authorized Officers. The Authorized Officers, and each of them acting individually, are hereby authorized and directed, for and in the name of and on behalf of the Agency, to execute and deliver any and all documents, certificates, agreements, and instruments, and to take any and all actions, which may be necessary or advisable to effectuate the membership approved by this Resolution and to carry out the intent hereof. The City Clerk is authorized and directed to attest the signature of any Authorized Officer and to affix the seal of the Agency, if applicable.
Section 5. No Financial Obligation. Nothing in this Resolution or the Non-Voting Member Agreement shall be construed to obligate the Agency to participate in any financing transaction, incur any indebtedness, or make any expenditure of public funds beyond those duly authorized by subsequent action of the City Council. Non-Voting Membership shall not create any cross-liability or joint obligation with any other member agency of the Authority.
Section 6. Certification. The City Clerk shall certify to the adoption of this Resolution and shall enter it in the official records of the Agency. A certified copy of this Resolution, together with the executed Non-Voting Member Agreement, shall be transmitted to the California Municipal Public Financing Authority.
72 3
Section 7. Effective Date. This Resolution shall take effect immediately upon its adoption.
THE FOREGOING RESOLUTION WAS PASSED AND ADOPTED at a regular meeting of the City Council of the City of Williams held on the 21st day of October 2026, by the following roll call vote:
AYES:
NOES:
ABSENT:
ABSTAIN:
ATTEST:
73 CalMuni PFA
CALIFORNIA MUNICIPAL PUBLIC FINANCE AUTHORITY
Government-to-Government
Financing for California
Communities
A statewide JPA helping public agencies plan, fund and finance essential infrastructure - with flexibility, transparency and a public-agency perspective.
CalMuniPFA-360 | PLAN • FUND • FINANCE • DELIVER
One resource. More ways to move projects forward.
CalMuni PFA can complement the planning, grants, reserves, rates and financing tools your agency already uses - giving staff and governing boards another option when the timing is right.
Competitive Financing
Market-tested structures tailored to the project.
Planning-First Support
Look at the full CIP before choosing a financing
path.
Flexible Structures
Direct placements, bonds, pooled programs and
more.
Complimentary Membership
No membership fee; transaction costs apply only
when financing proceeds.
Designed to work alongside your existing team
CalMuni PFA can be introduced early as an additional resource without replacing financing programs, municipal advisors, bond counsel or other professionals that are already serving the agency.
CALMUNIPFA.COM California Municipal Public Finance Authority 1 CalMuni PFA
CALIFORNIA MUNICIPAL PUBLIC FINANCE AUTHORITY
CalMuniPFA-360: Look at the whole capital picture
The best financing discussion often happens before the financing is chosen. 1 Understand the
CIP
Projects, timing and
priorities
2 Coordinate
Funding
Grants, subsidies and
local resources
3 Test Capacity
Reserves, rates and
debt affordability
4 Structure
Options
Banks, bonds, pooled
and bridge tools
5 Move Forward
Competitive process
and transaction
support
What goes into the conversation
Capital Improvement Program
Project sequencing and phased construction
Grants & Subsidies
SRF, WIFIA, USDA where eligible, and other
programs
Reserves & Cash
Preserve appropriate liquidity while advancing
priorities
Rates & Affordability
Coordinate timing with long-term financial
planning
Debt Capacity
Understand borrowing flexibility before
commitments are made
Projects CalMuni PFA can support
Water &
Wastewater
Community
Facilities
Equipment &
Fleet
Energy &
Resiliency
Transportation &
Infrastructure Housing
Schools &
Education Pooled Financing
Land /
Development
Infrastructure
The goal is not to force a financing. It is to give your agency more flexibility before major capital decisions are locked in.
CALMUNIPFA.COM California Municipal Public Finance Authority 2 CalMuni PFA
CALIFORNIA MUNICIPAL PUBLIC FINANCE AUTHORITY
Flexible financing options. One public-agency resource.
Choose the right tool for the project, timing and funding mix - without forcing every need into the same structure.
Competitive & Direct
Bank placements and other
competitive financing structures
designed around project size,
timing, term and repayment
needs.
• Tax-exempt / taxable options
• Bonds and direct placements
• Lease / lease-purchase structures
Subsidized & Bridge
Coordinate public financing with
state and federal programs when
eligible, including interim funding
while reimbursements or
permanent funding are pending.
• SRF / WIFIA coordination
• USDA where eligible
• Bridge / anticipation financing
Community &
Development
Flexible tools for facilities,
public safety, development
and other community-serving
projects.
• Community facilities
• Developer infrastructure
• Equipment, energy and
pooled programs
Membership is complimentary
There is no cost to become a member. Financing-related costs apply only when an agency elects to proceed with a transaction.
Simple next step
Bring us your CIP, project list or
financing question. We can help
identify possible pathways and
next steps.
Start with a conversation
We welcome a friendly, informational discussion about your capital priorities, existing funding resources and where the PFA may be useful. There is no obligation to finance through the Authority.
LET'S TALK
Lloyd Hedenland
[email protected]
(916) 258-4046
calmunipfa.com
California Municipal Public Finance Authority
2108 N. Street, Suite 5030 • Sacramento, CA 95816
CALMUNIPFA.COM California Municipal Public Finance Authority 3 City of Williams DATE: October 21, 2026
City Council ITEM: 10.
Agenda Report CATEGORY: Consent
SUBJECT: Accept Mayor’s Letter Supporting the Intent of the Revitalize Rural America Act BACKGROUND:
Mayor Dunlap received a request from Congressmen Gallagher and Thompson seeking support for the proposed Revitalize Rural America Act, bipartisan legislation intended to strengthen rural communities.
In response, Mayor’s prepared a letter expressing support for the stated intent of this legislation. Her letter is for Council’s consideration and acceptance.
DISCUSSION:
According to the bill’s sponsors, the proposed legislation would provide investments to expand technical assistance for rural governments, create incentives for rural public workforce; improve access to health care, housing and disaster resilience in rural communities, and sustain local agriculture. At this time, the text of this bill has not yet been released. Accordingly, Mayor’s letter endorses its stated objectives as described in the letter of request.
The County of Colusa Board of Supervisors is also considering a letter supporting the bill’s rural objectives.
FISCAL IMPACT: none
RECOMMENDATION: Accept Mayor’s letter supporting the intent of the proposed Revitalize Rural America Act
Attachment(s):
Joint Request Letter from Congressman Thomson and Congressman Gallagher Mayor Dunlap Letter on behalf of Williams City Council
Colusa County Board of Supervisor Letter (to be considered at the October 20 board meeting) Submitted by: Yvonne Kimball, City Manager
October 6, 2026
Kate Dunlap
Mayor
810 E Street
Williams, CA 95987
Dear Mayor Dunlap:
We respectfully request that Williams endorse the Revitalize Rural America Act, bipartisan legislation to strengthen rural communities, improve access to essential services, and support local economies.
As local leaders, you understand the challenges facing rural communities. Limited staffing can make it difficult to compete for federal funding, vacancies can strain essential services, and shortages of health care providers and affordable housing can make it harder for families to remain in the communities they call home. Local governments need federal policy that recognizes these challenges and help address them.
Our legislation would provide practical support for local governments and the residents they serve by:
Helping rural governments secure federal resources. Expand technical assistance for communities applying for grants, loans, and other programs.
Strengthening the public workforce: Provide tax relief for qualifying rural public employees and student loan forgiveness for rural public service to help recruit and retain essential workers. Improving access to health care: Expand telehealth, support physician recruitment in underserved communities, and create a tax credit to help rural hospitals retain employees. Support housing and disaster resilience: Expand access to housing tax credits and help property owners protect their homes and businesses against wildfires and other natural disasters. Sustaining local agriculture: Provide tax relief for qualifying farmland sales to young farmers or family members, helping keep agricultural land locally owned.
These investments would help local governments deliver services, support employers, and create opportunities for the next generation to build a future in rural America. They reflect a shared commitment to ensure that rural communities have the resources they need to succeed.
We respectfully request that you consider adopting a resolution or otherwise endorse the Revitalize Rural America Act.
Your support would help demonstrate the importance of this legislation to the local governments responsible for meeting rural residents' needs every day.
Thank you for your service to the local community and for considering this request. We look forward to our continued work together to strengthen rural communities.
Sincerely,
Mike Thompson
Member of Congress
James Gallagher
Member of Congress
City of Williams
810 E Street / P.O. Box 310 Williams CA 95987
Ph. (530) 235-3270 Fax (530) 473-2445
www.cityofwilliams.org
The Honorable James Gallagher October 7, 2026
United States House of Representatives
408 Cannon House Office Building
Washington, D.C. 20515
The Honorable Mike Thompson
United States House of Representatives
268 Cannon House Office Building
Washington, D.C. 20515
Re: Intent of the Revitalize Rural America Act
Dear Congressman Gallagher and Congressman Thompson,
On behalf of the City of Williams, thank you for requesting our support of the Revitalize Rural America Act. As a collective, the Williams City Council is in full support of the intent and spirit of the Act.
As this act serves to better identify and expand the definition of rural America, our City encourages the support for those individuals within underserved communities and areas. Our council is in full support for the Act’s extensive focus on increased healthcare access within rural communities and the expansion of federal funding and grant assistance for those organizations and agencies that serve those communities. As a rural city within a County that seeks to serve and support the efforts of agricultural workers, growers, and business related to the agricultural industry we are supportive of the intent to provide studies on the financial costs of federal regulation within agriculture. In addition, the intent of the Act to provide for greater services and financial policies that support the reduction of barriers to education, public employment, safety, and housing is of vital importance. Finally, we fully endorse the need for disaster relief measures that will serve to support rural business and homeowners in their efforts to be prepared for wildfire and natural disasters.
The Williams City Council recognizes your bipartisan efforts to highlight the needs and challenges facing rural communities in Northern California and across the nation. We look forward to working with you both to advance policies that support and strengthen the residents, businesses, and agencies within rural cities, counties, and communities.
Sincerely,
Kate Dunlap
Mayor, Williams City Council
JOSE MERCED CORONA, DISTRICT I, COUNTY OF COLUSA
CHAIR
DAURICE K. SMITH, DISTRICT II BOARD OF
KENT S. BOES, DISTRICT III, SUPERVISORS
RANDY WILSON, DISTRICT IV, 547 Market Street, Suite 102 JANICE A. BELL, DISTRICT V, Colusa, CA 95932
VICE-CHAIR
(530) 458-0508
CALIFORNIA Fax (530) 458-0510
[email protected]
October 20, 2026
The Honorable Mike Thompson
United States House of Representatives
268 Cannon House Office Building
Washington, D.C. 20515
The Honorable James Gallagher
United States House of Representatives
408 Cannon House Office Building
Washington, D.C. 20515
Re: Federal Investment in Rural Communities and Local Governments Dear Congressman Thompson and Congressman Gallagher:
On behalf of the Colusa County Board of Supervisors, thank you for bringing the Revitalize Rural America Act to our attention and, more broadly, for your efforts to address the unique challenges rural communities face.
Colusa County strongly supports federal policies that recognize the important role of rural local governments and invest meaningfully in their ability to serve their communities. Rural counties deliver many of the same essential services as larger jurisdictions, but often with smaller workforces, limited administrative capacity, fewer resources to compete for state and federal funding, and persistent challenges recruiting and retaining qualified professionals.
We appreciate the Revitalize Rural America Act's focus on issues particularly important to rural communities, including improving access to federal resources, strengthening the rural public workforce, supporting rural health care, expanding housing and disaster resilience, and sustaining agriculture. These priorities closely reflect the challenges Colusa County and other rural jurisdictions face.
As Congress considers this legislation and other proposals affecting rural America, Colusa County encourages continued federal investment in rural government capacity, essential services, infrastructure, workforce development, health care, housing, agriculture, economic opportunity, and community resilience. We also encourage policies and programs that provide sufficient flexibility to recognize the scale, staffing capacity, and unique service-delivery needs of small rural counties.
The Colusa County Board of Supervisors appreciates your bipartisan efforts to elevate the needs of rural communities and looks forward to working with you to advance policies that strengthen rural counties and the residents, businesses, and agricultural communities we serve.
Sincerely,
Jose Merced Corona
Chair - Colusa County Board of Supervisors
City of Williams DATE: October 21, 2026
City Council ITEM #: 11.
Agenda Report CATEGORY: Old Business
SUBJECT: Treasurer’s Investment Report and Monthly Register as of August 2026; Monthly Financial Status Reports as of August 2026
BACKGROUND:
The attached report provides the most current information on the City’s investments and the check register report for August 2026. The source of this information is provided monthly by various financial institutions. The deposits and investments described in the attached report comply with the City’s Investment Policy.
Also included is a monthly update of the City’s Sales Taxes and Transient Occupancy Taxes (TOT) projections which can have a material impact on the City’s annual General Fund revenues. The attached Fiscal Year 2027 analysis has been updated to include receipts received through the end of August 2026.
These projections are incorporated into the updated monthly financial status reports that provide a financial overview of the City’s General Fund and Water and Sewer Enterprise Funds as of August 2025.
It includes the approved budgets and year-to-date activities for both revenues and expenditures. For the General Fund, it is important to note that there is a lag in receipts for both property and sales taxes.
DISCUSSION:
SALES TAX UPDATE:
The City has received one sales tax payment so far this fiscal year. The first two payments of every quarter are advanced estimates provided by the State and do not yet reflect actual sales activity. For this reason, estimates are revised quarterly. Early estimates can fluctuate significantly due to the volatility of sales tax revenues and the continually changing economic environment. Our sales tax projections are currently equal to budget and will be updated once a full quarterly amount is received.
TRANSIENT OCCUPANCY TAXES UPDATE:
These revenues have been updated to include actual receipts through the end of August 2026. Based on actual receipts, TOT revenues are currently projected to come in at $577,251, $101,987 higher than the budgeted $475,264. This revenue source can fluctuate from month to month depending on travel activity and local lodging demand.
PRELIMINARY E STREET PROJECT UPDATE:
Also included is a Preliminary E Streets Project Summary including a breakdown of the Sources and Uses of related project costs. It is to be noted that this is only a preliminary analysis with projected grant fund availability and estimated project costs. It includes budgets and expenditures incurred to date.
FINANCIAL STATUS REPORTS UPDATE:
Dividing the year-to-date activity against the budget gives us a percentage of budgets utilized. This percentage can then be compared against the expected level of utilization at any period of time allowing us to identify if our expenditures are trending over budget or our revenues are trending under budget.
Based on current budget projections and a review of financial statements, the City’s overall actual revenues and expenditures are in line with the approved budgets. The attached General Fund Status reports include expenditure budgets by department. Notes are included for any unexpected deviations.
CITY INVESTMENTS:
The City invests its surplus funds in various financial institutions in accordance with the City’s approved investment policy. The City’s surplus funds are held in the Local Agency Investment Fund and California CLASS which are part of a Pooled Money Investment Accounts (PMIA) with other participating government agencies.
Based on current budget projections, the City’s cash liquidity is sufficient to cover the expenditures anticipated for the next six months.
The attached report provides the most current information on the City’s investments. The deposits and investments described in the attached report comply with the City’s Investment Policy.
RECOMMENDED ACTION:
Staff recommends that City Council accept the August 2026 Treasurer’s Investment and Register Reports and monthly status reports.
Prepared and submitted by: Rex Greenbaum, Finance Director Attachment(s):
• Treasurer’s Monthly Cash Summary
• General Fund Financial Status Report with Sales Taxes and Transient Occupancy Taxes Projections
• Water and Sewer Enterprise Funds Financial Status Reports • Preliminary E Streets Project Summary
• Monthly Check Register Report
CASH ACCOUNTS
US Bank - Business Checking $ 77,310
US Bank - General Checking (City Treasury) $ 1,374,834
Total Cash $ 1,452,144
INVESTMENT PORTFOLIO
Description Interest
Local Agency Investment Fund (LAIF) 3.86% $ 7,273,105
California CLASS Funds 3.75% $ 4,255,352
Total Investments $ 11,528,457
Cash & Investments $ 12,980,601
General Fund Apportionment of Cash & Investments
Of the total Cash & Investments, the amount belonging to the General Fund was as follows:
General Fund Cash & Investment Balances $ 6,927,287
Less Storm Drain Deficit (Fund 273) $ (43,162)
Less Street Cash Deficit (Fund 290)* $ (1,659,902)
Less Morning Star Street Loan (Fund 290)* $ (322,464)
Total Deficits $ (2,025,528)
Net General Fund Balance $ 4,901,759
Remaining Pledged Funds for E Street Project (Total pledge of $2,000,000) $ 390,099 Adjusted General Fund Balance $ 4,511,660
* Total E Street Project Expenditures included in Deficit $ 1,609,901 Morning Star Loan for Highway 99 Expense of $522,464.30 to be repaid as follows:
May 15, 2025 - Paid $ 100,000.00
May 15, 2026 - Paid in May 2026 $ 100,000.00
May 15, 2027 $ 322,464.30
Yield Comparison CA CLASS LAIF Variance
August-25 4.33% 4.25% 0.07%
September-25 4.27% 4.21% 0.06%
October-25 4.19% 4.15% 0.04%
November-25 4.04% 4.10% -0.06%
December-25 3.88% 4.03% -0.15%
January-26 3.78% 3.93% -0.15%
February-26 3.74% 3.87% -0.13%
March-26 3.70% 3.83% -0.13%
April-26 3.69% 3.81% -0.12%
May-26 3.70% 3.81% -0.11%
June-26 3.70% 3.82% -0.12%
July-26 3.72% 3.84% -0.12%
August-26 3.75% 3.86% -0.11%
Average Monthly Rate 3.88% 3.96% -0.08%
The Deposits and investments described above comply with the adopted City of Williams Investment Policy.
Prepared and Submitted by: Rex J. Greenbaum, Finance Director U:\Officer\Council Communications\FY2027\Treasurer's Report FY2027\[August 2026 Investment Detail for 10.21.26 Meeting.xls]GF Proj FY27
CITY OF WILLIAMS
SUMMARY OF CASH AND INVESTMENTS
As of August 31, 2026
Note: Annual departmental insurance has been prorated to reflect monthly usage.
GENERAL FUND BUDGET YTD ACTIVITY
% to
BUDGET NOTES
Revenues: $ 5,903,287 $ 773,742 13.1% Property tax installments typically received in February, May, and July.
Forecasted Revenue $ 6,005,274 Sales tax receipts lag by 3 months with small amount of income in first 3 months.
Revenue Variance $ 101,987 Monthly reviews of Sales and Transient Occupancy Taxes included with Treasurer's Report.
Expenditures:
City Council $ 317,951 $ 26,907 8.5%
City Clerk $ 123,767 $ 24,261 19.6%
City Administrator $ 149,514 $ 21,934 14.7%
Finance $ 429,944 $ 74,387 17.3% Budgets include annual Infrastructure and vehicle contributions of $100k and $50k.
Police $ 2,415,206 $ 359,975 14.9%
Fire District $ 867,000 $ 216,750 25.0%
Planning $ 254,326 $ 48,678 19.1%
Building $ 189,092 $ 6,795 3.6%
Parks $ 232,158 $ 36,941 15.9%
Recreation $ 126,460 $ 23,410 18.5%
Buildings & Grounds $ 441,493 $ 65,431 14.8%
Public Works $ 159,092 $ 21,167 13.3%
Swimming Pool $ 95,119 $ 48,277 50.8%
Storm Drain $ 61,810 $ 8,116 13.1%
Total $ 5,862,932 $ 983,028 16.8% Expenditures trending in line with approved budgets.
FY2027
Budgeted
Received
through
August 2026
Projected
FY2027
Revenues
Projected FY2026
Surplus (Shortfall)
%
Difference
Bradley Burns Sales Taxes (1%) 1,630,538 114,324 1,630,538 - 0.0% Add On Sales Taxes (0.5%) 968,655 52,055 968,655 - 0.0% Total Sales Taxes 2,599,193 166,379 2,599,193 - 0.0%
Transient Occupancy Taxes 476,264 93,048 577,251 100,987 21.2% Totals 100,987
General Fund Financial Status Report as of August 31, 2026 Year End Update (16.7% of Year) Budgets include annual LAFCO and attorney fees.
Funds to Fire District provided in quarterly installments.
Sales Taxes and Transient Occupancy Taxes
Higher proportion of usage occurs in summer. Reflects pool use in July and August.
Note: Annual departmental insurance has been prorated to reflect monthly usage.
Fund BUDGET YTD ACTIVITY
% to
BUDGET NOTES
Water - Fund 270
Revenues: $ 1,511,585 $ 327,753 21.7%
Expenditures: $ 1,352,193 $ 248,534 18.4%
Net Income (Loss) $ 159,392 $ 79,219
Sewer - Fund 271
Revenues: $ 2,793,025 $ 446,500 16.0%
Recoverable Costs: $ 300,000 $ 21,615 7.2%
Total Revenues $ 3,093,025 $ 468,115
Expenditures: $ 2,929,651 $ 450,036 15.4%
Net Income (Loss) $ 163,374 $ 18,079
Expenditures trending in line with budgets. Annual insurance expense has been prorated for the period.
Includes prorated portion of annual Sewer Debt Service Payment of $363,965.
Water and Sewer Enterprise Funds Financial Status Report as of August 31, 2026 Year End Update (16.7% of Year)
Revenues trending in line with budgets, reflects higher usage in summer months and reflects rate increase.
Annual insurance expense is prorated by month.
Sewer Revenues in line with budget.
Revenue dependent upon intake of sludge from Arbuckle plant and other recoverable costs.
Budgeted Expended
Remaining
Budget
Bennett Engineering Original All inclusive Budget 1,077,394 Bennett Budget Amendment for Additional Designe
Services 160,590
Total Bennett Engineering 1,237,984 1,237,984 1,172,002 65,982 Teichert E Street Bid 8,894,068
Teichert Contingency @ 5% 444,703
Construction Management E Street 980,000
10,318,771 10,318,771 10,318,771
PG&E E Street Project Expenditures 313,149 313,149 313,149 - Other Right of Way Costs Incurred* 124,751 124,751 124,751 - Total E Street Project Costs (Excluding Water &
Sewer Lines) 11,994,655 1,609,901 10,384,754
Sources of Grant Funds
E Streets Grant Funding 9,141,000
REAP 2.0 Estimated Funding 2,400,000
General Fund Needed to Complete** 453,655
Total Revenues 11,994,655
** This exceeds $404,000 local funds to be provided
per 25-C report
Remaining General Fund Allocations (From
$2,000,000) 1,546,345
This funding could be used to loan for Water and
Sewer Improvements
DRAFT
Enterprise Funds Portion
E Street Water and Sewer Line Engineering Estimate 2,700,000 E Street Water and Sewer Construction Management 122,936 2,822,936 2,822,936
Additional Funding Needed 1,276,591
Preliminary E Streets Project Summary
* These were costs paid directly by the City of Williams.
CITY OF WILLIAMS Check Register - Treasurer Rpt Page: 1 FINANCE DEPARTMENT 08/26 (08/31/2026) to 08/26 (08/31/2026) Sep 22, 2026 11:54AM Report Criteria:
Print Sequence Detail
Journal Code.Journal code = "CDA"
Transaction.Amount >0
Journal Payee or Description Date
Check
Number
Check
Amount
CDA ADVANCED DOCUMENT 08/14/2026 52356 229.41
CDA AMAZON CAPITAL SERVICES 08/14/2026 52358 1,565.81
CDA AMERICAN FIDELITY ASSURANCE 08/14/2026 52359 2,007.29 CDA AMERICAN FIDELITY FLEX ACCOUNT 08/14/2026 52360 816.65 CDA AMERITAS LIFE INSURANCE CORP 08/14/2026 52361 3,176.72 CDA BEST BEST & KRIEGER LLP 08/14/2026 52363 4,520.80
CDA BIDWELL H20 08/14/2026 52364 73.95
CDA CARINAS CREATIONS 08/14/2026 52365 40.00
CDA CEB 08/14/2026 52366 726.32
CDA CITY OF WILLIAMS 08/14/2026 52368 516.32
CDA CLOSE LUMBER 08/14/2026 52370 134.83
CDA COLUSA COUNTY AUDITOR'S OFFICE 08/14/2026 52371 37.50 CDA DERODA INC 08/14/2026 52374 15.07
CDA DOWN RANGE 08/14/2026 52376 163.85
CDA EFUEL LLC 08/14/2026 52377 1,083.14
CDA HOBLIT MOTORS 08/14/2026 52379 346.65
CDA INFOBIP INC 08/14/2026 52380 218.63
CDA INK AND THREAD CREATIONS 08/14/2026 52381 43.54
CDA LAWSON PRODUCTS INC 08/14/2026 52383 438.50
CDA LEXIPOL LLC 08/14/2026 52385 10,557.99
CDA MESSENGER PUBLISHING GROUP 08/14/2026 52386 1,190.00 CDA MID VALLEY AUTO CARE 08/14/2026 52388 22.98
CDA PACE ENGINEERING, INC 08/14/2026 52390 1,004.00
CDA PACIFIC GAS & ELECTRIC CO 08/14/2026 52392 16,444.52 CDA PRECISION BUSINESS ASSOC., INC 08/14/2026 52393 3,582.68 CDA PREMIER PRINT & MAIL 08/14/2026 52394 825.62
CDA RACE COMMUNICATIONS 08/14/2026 52395 1,562.90
CDA SORENSON PEST CONTROL, INC. 08/14/2026 52398 475.00 CDA TRANSUNION RISK AND ALTERNATIVE 08/14/2026 52403 100.00 CDA UNUM LIFE INS. COMPANY OF AMER 08/14/2026 52405 421.23 CDA VALLEY TOXICOLOGY SERVICE, INC 08/14/2026 52406 1,180.00 CDA VERIZON WIRELESS 08/14/2026 52407 586.04
CDA VESTIS GROUP INC 08/14/2026 52408 238.32
CDA ZAYO GROUP LLC 08/14/2026 52409 1,169.77
CDA PRECISION BUSINESS ASSOC., INC 08/14/2026 52411 2,670.00 CDA AMAZON CAPITAL SERVICES 08/26/2026 52414 846.34
CDA BENNETT ENGINEERING SERVICES 08/26/2026 52418 30,301.25 CDA BEST BEST & KRIEGER LLP 08/26/2026 52419 20,505.50
CDA BIDWELL H20 08/26/2026 52420 79.95
CDA CLOSE LUMBER 08/26/2026 52422 322.25
CDA COLUSA COUNTY FARM SUPPLY, INC 08/26/2026 52423 1,893.55 CDA COMCAST BUSINESS 08/26/2026 52424 424.39
CDA DERODA INC 08/26/2026 52426 18.80
CDA EFUEL LLC 08/26/2026 52427 1,230.92
CDA FLETCHER'S PLUMBING 08/26/2026 52428 1,785.00
CDA JESSICA KARLONAS 08/26/2026 52430 540.00
CDA LAWSON PRODUCTS INC 08/26/2026 52431 823.73
CDA MEDICAL AIR SERVICES ASSOCIATION B2B 08/26/2026 52432 3,360.00 CDA MUNISERVICES 08/26/2026 52434 4,464.37
CDA O'REILLY AUTO PARTS 08/26/2026 52435 48.28
CDA PACIFIC GAS & ELECTRIC CO 08/26/2026 52438 17,378.24 CDA PER DIEM 08/26/2026 52439 628.00
CDA REFUND 08/26/2026 52442 500.00
Recreation Banner
City Clerk Municipal Handbook
Police Uniforms
Annual LawEnforcement training/Manual/
Bulletin / Policy Manual
Engineering Services - General
Police- Citation Forms
Police Dept. Software
Police DOJ Line
Valley Vista Park Repairs
Public Works Water Jugs
City Employees Annual MASA Renewals
SUTA Service 4qtr
CITY OF WILLIAMS Check Register - Treasurer Rpt Page: 2 FINANCE DEPARTMENT 08/26 (08/31/2026) to 08/26 (08/31/2026) Sep 22, 2026 11:54AM Journal Payee or Description Date
Check
Number
Check
Amount
CDA REIMBURSEMENT 08/26/2026 52443 300.00
CDA SCP DISTRIBUTORS LLC 08/26/2026 52445 1,332.79
CDA SORENSON PEST CONTROL, INC. 08/26/2026 52446 80.00
CDA TEXAS LIFE INSURANCE COMPANY 08/26/2026 52447 363.50 CDA UNUM LIFE INS. COMPANY OF AMER 08/26/2026 52448 421.23 CDA VERIZON WIRELESS 08/26/2026 52449 576.77
CDA VESTIS GROUP INC 08/26/2026 52450 399.48
CDA VISION SERVICE PLAN (CA) 08/26/2026 52451 495.28
CDA U S BANK NATIONAL ASSOCIATION 08/26/2026 52453 363.92 CDA U S BANK NATIONAL ASSOCIATION 08/27/2026 52454 993.33 CDA HOUSING TOOLS LLC 08/26/2026 52429 1,250.00
CDA LDA PARTNERS DESIGNERS & ARCHITECTS 08/14/2026 52384 8,477.20 CDA TERRACON CONSULTANTS INC 08/14/2026 52401 3,200.00
CDA RECOLOGY BUTTE COLUSA COUNTIES 08/26/2026 52441 52.43 CDA DEWBERRY ENGINEERS INC 08/14/2026 52375 8,658.97
CDA DEWBERRY ENGINEERS INC 08/14/2026 52412 25,168.44
CDA ADVANCED DOCUMENT 08/14/2026 52356 83.86
CDA AMAZON CAPITAL SERVICES 08/14/2026 52358 95.94
CDA BENNETT ENGINEERING SERVICES 08/14/2026 52362 1,708.75 CDA BEST BEST & KRIEGER LLP 08/14/2026 52363 410.00
CDA CLOSE LUMBER 08/14/2026 52370 10.81
CDA CPM, INC. 08/14/2026 52372 3,997.83
CDA FERGUSON WATERWORKS #1423 08/14/2026 52378 8,289.38 CDA MID VALLEY AUTO CARE 08/14/2026 52388 1,420.98
CDA PACE ENGINEERING, INC 08/14/2026 52390 792.00
CDA PACIFIC GAS & ELECTRIC CO 08/14/2026 52392 2,255.59 CDA PRECISION BUSINESS ASSOC., INC 08/14/2026 52393 714.91 CDA RACE COMMUNICATIONS 08/14/2026 52395 312.58
CDA SCP DISTRIBUTORS LLC 08/14/2026 52396 820.22
CDA SORENSON PEST CONTROL, INC. 08/14/2026 52398 160.00 CDA STATE WATER RESOURCES 08/14/2026 52399 60.00
CDA UNDERGROUND SERVICE ALERT OF 08/14/2026 52404 471.78 CDA VESTIS GROUP INC 08/14/2026 52408 78.10
CDA ALPHA ANALYTICAL LABORATORIES INC 08/14/2026 52410 230.00 CDA AMAZON CAPITAL SERVICES 08/26/2026 52414 64.92
CDA AQUA-METRIC SALES CO 08/26/2026 52415 2,931.21
CDA BAY CITY ELECTRIC WORKS 08/26/2026 52416 2,048.21
CDA BENNETT ENGINEERING SERVICES 08/26/2026 52418 3,165.50 CDA COLUSA COUNTY FARM SUPPLY, INC 08/26/2026 52423 69.21 CDA EFUEL LLC 08/26/2026 52427 843.51
CDA PACIFIC GAS & ELECTRIC CO 08/26/2026 52438 16,968.54 CDA SCP DISTRIBUTORS LLC 08/26/2026 52445 2,668.34
CDA VERIZON WIRELESS 08/26/2026 52449 315.16
CDA VESTIS GROUP INC 08/26/2026 52450 78.10
CDA ALPHA ANALYTICAL LABORATORIES INC 08/26/2026 52452 445.00 CDA U S BANK NATIONAL ASSOCIATION 08/27/2026 52454 4,935.51 CDA ADVANCED DOCUMENT 08/14/2026 52356 83.86
CDA ALPHA ANALYTICAL LABORATORIES INC 08/14/2026 52357 831.00 CDA AMAZON CAPITAL SERVICES 08/14/2026 52358 521.78
CDA BENNETT ENGINEERING SERVICES 08/14/2026 52362 6,696.00 CDA CENTRAL VALLEY SALINITY COALITION INC 08/14/2026 52367 501.00 CDA CWEA NSVS 08/14/2026 52373 300.00
CDA DERODA INC 08/14/2026 52374 265.48
CDA PACE ENGINEERING, INC 08/14/2026 52390 30,919.75
CDA PACE SUPPLY CORP. 08/14/2026 52391 2,948.34
CDA PACIFIC GAS & ELECTRIC CO 08/14/2026 52392 242.48
CDA PRECISION BUSINESS ASSOC., INC 08/14/2026 52393 714.91 CDA RACE COMMUNICATIONS 08/14/2026 52395 625.16
470 7 Street
470 7 Street
Marguerite Street Instersection
Marguerite Street Instersection
WELL 8
Water Dep. Supplies
Meters- repairs/Replacements
Well 11
CITY OF WILLIAMS Check Register - Treasurer Rpt Page: 3 FINANCE DEPARTMENT 08/26 (08/31/2026) to 08/26 (08/31/2026) Sep 22, 2026 11:54AM Journal Payee or Description Date
Check
Number
Check
Amount
CDA SHOP N SAVE MARKET 08/14/2026 52397 30.78
CDA SORENSON PEST CONTROL, INC. 08/14/2026 52398 70.00
CDA TELSTAR INSTRUMENTS INC 08/14/2026 52400 7,647.25
CDA THE DOOR COMPANY 08/14/2026 52402 615.00
CDA VESTIS GROUP INC 08/14/2026 52408 78.22
CDA ALPHA ANALYTICAL LABORATORIES INC 08/26/2026 52413 721.00 CDA BENNETT ENGINEERING SERVICES 08/26/2026 52418 263.00 CDA COLUSA COUNTY FARM SUPPLY, INC 08/26/2026 52423 958.26 CDA CWEA- NORTH COAST 08/26/2026 52425 259.00
CDA EFUEL LLC 08/26/2026 52427 1,172.70
CDA O'REILLY AUTO PARTS 08/26/2026 52435 133.92
CDA PACE SUPPLY CORP. 08/26/2026 52437 5,160.54
CDA PACIFIC GAS & ELECTRIC CO 08/26/2026 52438 7,137.28 CDA RADWELL INTERNATIONAL LLC 08/26/2026 52440 840.02
CDA ROBINSON ENTERPRISES, INC. 08/26/2026 52444 2,960.76 CDA VERIZON WIRELESS 08/26/2026 52449 442.20
CDA VESTIS GROUP INC 08/26/2026 52450 78.22
CDA U S BANK NATIONAL ASSOCIATION 08/27/2026 52454 215.21 CDA BEST BEST & KRIEGER LLP 08/14/2026 52363 2,255.00
CDA CITY OF WILLIAMS 08/14/2026 52368 452.85
CDA PACIFIC GAS & ELECTRIC CO 08/14/2026 52392 8,867.71 CDA SORENSON PEST CONTROL, INC. 08/14/2026 52398 20.00
CDA BENNETT ENGINEERING SERVICES 08/26/2026 52418 2,893.00 CDA BEST BEST & KRIEGER LLP 08/26/2026 52419 656.00
CDA PACIFIC GAS & ELECTRIC CO 08/26/2026 52438 1,664.77 CDA AMAZON CAPITAL SERVICES 08/14/2026 52358 42.16
CDA BENNETT ENGINEERING SERVICES 08/14/2026 52362 10,840.99 CDA CLOSE LUMBER 08/14/2026 52370 44.34
CDA DERODA INC 08/14/2026 52374 596.84
CDA MESSENGER PUBLISHING GROUP 08/14/2026 52386 170.00
CDA MESSICK ACE HARDWARE 08/14/2026 52387 29.35
CDA MID VALLEY AUTO CARE 08/14/2026 52388 436.47
CDA PACE ENGINEERING, INC 08/14/2026 52390 20,159.00
CDA PACIFIC GAS & ELECTRIC CO 08/14/2026 52392 3,917.86 CDA AMAZON CAPITAL SERVICES 08/26/2026 52414 262.98
CDA BEELER TRACTOR COMPANY 08/26/2026 52417 533.86
CDA BENNETT ENGINEERING SERVICES 08/26/2026 52418 21,374.79 CDA BEST BEST & KRIEGER LLP 08/26/2026 52419 6,524.40
CDA CLOSE LUMBER 08/26/2026 52422 24.65
CDA COLUSA COUNTY FARM SUPPLY, INC 08/26/2026 52423 2,977.39 CDA DERODA INC 08/26/2026 52426 197.58
CDA EFUEL LLC 08/26/2026 52427 1,339.41
CDA O'REILLY AUTO PARTS 08/26/2026 52435 277.49
CDA PACIFIC GAS & ELECTRIC CO 08/26/2026 52438 3,944.00 CDA U S BANK NATIONAL ASSOCIATION 08/27/2026 52454 199.41 CDA CIVICPLUS LLC 08/14/2026 52369 3,000.00
CDA LARKYN FEILER 08/14/2026 52382 5,380.58
CDA P. SCOTT BROWNE 08/14/2026 52389 2,229.00
CDA CALAFCO 08/26/2026 52421 2,370.00
CDA MESSENGER PUBLISHING GROUP 08/26/2026 52433 140.00
CDA P. SCOTT BROWNE 08/26/2026 52436 2,229.00
Grand Totals: 431,399.88
WWTP repairs/ClarifierFailure
CITY OF WILLIAMS Check Register - Treasurer Rpt Page: 4 FINANCE DEPARTMENT 08/26 (08/31/2026) to 08/26 (08/31/2026) Sep 22, 2026 11:54AM Report Criteria:
Print Sequence Detail
Journal Code.Journal code = "CDA"
Transaction.Amount >0
Pacific Gas & Electric Breakdown By Account
Main Account
Pool $4,695.32
Bldgs $12,187.45
Parks $403.59
Collections $231.62
WWTP $6,905.66
LLAD $1,550.87
Streets $3,944.00
Water $5,142.59
Eastside Unit 8 $113.90
470 7 Street $22.21
Theatre $5,546.53
Police Dept $2,615.75
Well 11 $6,279.42
AG Barn $69.67
Pace Engineering
Waste Water Collection $24,560.00
As Needed Srvs $1,004.00
DWSRF $ 792.00
E Street Water/Sewer Imp. $20,159.00
Wastewater Operations $4,462.00
Bennett Engineering
Eng. Support $263.00
Streets $14,571.75
Water $3,165.50
Sewer $263.00
Planning $263.00
LLAD $2,893.00
Maverick $29,775.25
E Street $6,803.04
BB&K
General Services July 2026
LLAD $656.00
Records Request $191.80
Coucil $12,167.90
Personel $802.00
Streets $2,279.10
Elections $7,343.00
E Street Project $4,245.30
City of Williams DATE: October 14, 2026
City Council ITEM #: 12.
Agenda Report CATEGORY: NEW BUSINESS
SUBJECT: Award of Construction Contract – Highway Safety Improvement Program (HSIP) Intersection Improvements (City Contract No. 02-26, City Project No. 02-2026, HSIP Unique Project ID: H11-03-025)
BACKGROUND
The City of Williams has been awarded federal funding under the Highway Safety Improvement Program (HSIP) administered by the California Department of Transportation (Caltrans). HSIP is a federally funded, data-driven safety program established under Title 23, United States Code, Section 148, intended to reduce fatalities and serious injuries on public roadways. The HSIP Intersection Improvements Project is one of two active HSIP projects in the City ready to advance to construction.
Following City Council authorization on May 20, 2026, to adopt the plans and specifications and advertise the project, staff advertised the HSIP Intersection Improvements Project for competitive construction bids in accordance with Public Contract Code Section 22039. The City publicly opened bids for the HSIP Intersection Improvements Project on June 22, 2026. Two bids were received. Vaca Valley Excavating & Trucking, Inc. submitted the apparent low bid; however, that firm was deemed non-responsive due to errors in subcontractor identification, and St. Francis Electric, LLC. is the lowest responsive and responsible bidder available for award. Staff has reviewed the bid results and is bringing this item to the City Council for award of the construction contract.
DISCUSSION
The HSIP Intersection Improvements Project will construct intersection pavement markings, install flashing beacons as advance warning at non-signalized intersections (NS.I), and install transverse rumble strips on approaches.
The engineer's estimate, dated May 6, 2026, totaled $341,000.00. Bid results for City Contract No. 02-26 are summarized below:
Bidder Base Bid Base Bid + Alt. No.
1 St. Francis Electric, LLC. $207,257.00 $287,107.00
Vaca Valley Excavating & Trucking, Inc. $171,048.06 $246,249.21 Engineer's Estimate (Base Bid Schedule) $293,400.00 $341,000.00 The bid documents provide that bids remain valid for ninety (90) calendar days after the bid opening. Because bids were opened on June 22, 2026, that period lapsed prior to this award due to delays from Caltrans providing authorization to proceed. Staff contacted St. Francis Electric, LLC.
And confirmed that it will honor its submitted bid prices and is prepared to execute the construction contract at the bid amount. St. Francis Electric, LLC. is therefore the lowest responsive and responsible bidder available for award.
City staff completed an administrative responsiveness review of St. Francis Electric, LLC. The review confirms that the firm is responsive and responsible: it holds a current and active California Class A and C-10 (Electrical) contractor's license (License No. 1003811), is registered with the Department of Industrial Relations (DIR Registration No. 1000022208), and submitted the required bid security, Noncollusion Affidavit, and Subcontractor List. Staff has confirmed St.
Francis Electric, LLC. as the lowest responsive and responsible bidder for this project.
FISCAL IMPACT
The total estimated project cost is $366,948.00, covering the construction contract, a construction contingency, and construction engineering/construction management (CE/CM), as broken down below:
Cost Component Amount
Construction Contract (Base Bid + Alternate Bid No. 1) $287,107.00 Construction Contingency (10%) $28,711.00
Construction Engineering / Construction Management (CE/CM) $51,130.00 Total Project Cost $366,948.00
The project funding breakdown is as follows:
Funding Source Amount Notes
HSIP Federal Funds (State-administered) $288,000.00 90% of participating costs (Base Bid +
CE/CM); subject to
Caltrans confirmation
City Local Match (participating costs) $41,412.43 Included in adopted CIP budget
City Funds (non-participating – Alternate Bid
No. 1)
$62,585.57 Recommended for award
with the Base Bid
City Construction Contingency (10%) $28,711.00 City-funded reserve for change orders
Total Authorized Funding $420,709.00
The funding authorized for this project exceeds its estimated cost. The Caltrans HSIP Finance Letter, dated July 13, 2026, authorized up to $288,000.00 in HSIP funds toward the project, with the remaining eligible and non-participating costs funded by the City. Because the construction bids were received below the engineer's estimate on which the Finance Letter was based, the City's actual expenditures, and the corresponding reimbursement, are expected to be lower than the authorized amounts shown above.
HSIP funds are provided on a reimbursement basis rather than as a lump-sum payment. The City will fund project costs as they are incurred and will subsequently be reimbursed at 90% of eligible participating costs, which include both the participating construction work and construction engineering/construction management (CE/CM). Costs that are not eligible for HSIP participation, including the Alternate Bid No. 1 improvements and the construction contingency, are the sole responsibility of the City. Accordingly, the City should not anticipate reimbursement of the full $288,000.00 authorized, nor of 90% of the total project cost; reimbursement will be based on 90% of the actual eligible costs incurred.
Sufficient funding for the recommended award is available in the approved project budget, and staff will monitor construction costs and any change orders against that budget throughout construction.
RECOMMENDATION
Staff recommends the City Council:
1. Approve Resolution 26-37 and find St. Francis Electric, LLC. to be the lowest responsive and responsible bidder for City Contract No. 02-26;
2. Award the construction contract to St. Francis Electric, LLC. in the amount of $287,107.00 (Base Bid of $207,257.00 plus Alternate Bid No. 1 of $79,850.00);
3. Authorize the City Manager to execute the construction contract and related documents, subject to St. Francis Electric’s timely submission of the required performance bond, payment bond, insurance certificates, and executed contract; and
4. Approve a 10% construction contingency ($28,711.00) for unanticipated changes and contract change orders, for a total construction budget not to exceed $315,818.
Prepared and Submitted by: Dave Harden, PE, City Engineer Attachments:
Bid Comparison Summary – City Contract No. 02-26, HSIP Intersection Improvements Bid Opening Results, June 22, 2026
Bid Documents - City Contract No. 02-26, HSIP Intersection Improvements Resolution 26-37
NO. ITEM DESCRIPTION UNIT EST. QTY. UNIT PRICE LINE ITEM COST UNIT PRICE LINE ITEM COST 1 MOBILIZATION LS 1 $16,000.00 $16,000.00 $23,507.22 $23,507.222 TRAFFIC CONTROL SYSTEM LS 1 $20,000.00 $20,000.00 $45,874.41 $45,874.413 WATER POLLUTION CONTROL PROGRAM LS 1 $5,249.80 $5,249.80 $955.72 $955.724 ROADSIDE SIGN - ONE POST EA 7 $1,500.00 $10,500.00 $700.86 $4,906.025 THERMOPLASTIC TRAFFIC STRIPE - DETAIL 1 LF 111 $2.60 $288.60 $7.65 $849.156 THERMOPLASTIC TRAFFIC STRIPE - DETAIL 22 LF 730 $6.60 $4,818.00 $14.65 $10,694.507 THERMOPLASTIC TRAFFIC STRIPE - DETAIL 21 LF 36 $6.60 $237.60 $15.29 $550.448 12-INCH LIMIT LINE SQFT 300 $20.00 $6,000.00 $15.29 $4,587.009 THERMOPLASTIC PAVEMENT MARKINGS SQFT 520 $16.00 $8,320.00 $20.39 $10,602.80 10 TRANSVERSE RUMBLE STRIPS LF 390 $5.10 $1,989.00 $17.65 $6,883.5011 FLASHING STOP SIGN EA 7 $6,250.00 $43,750.00 $3,185.72 $22,300.0412 SOLAR FLASHING BEACON SYSTEM EA 7 $10,700.00 $74,900.00 $4,460.01 $31,220.0713 REMOVE ROADSIDE SIGN EA 7 $500.00 $3,500.00 $318.57 $2,229.9914 REMOVE THERMOPLASTIC PAVEMENT MARKING SQFT 440 $10.60 $4,664.00 $5.10 $2,244.00 15 REMOVE THERMOPLASTIC TRAFFIC STRIPE LF 880 $8.00 $7,040.00 $4.14 $3,643.20 $207,257.00 $171,048.06
Total Base + Allternate Bids $287,107.00 $246,249.21
City Project No. 02-2026
BASE BID COMPARISON
ST FRANCIS VACA VALLEY
TOTAL BASE BID PRICE
FOUNDED 1816
CITY OF WILLIAMS
HSIP Intersection Improvements Project
Bid Opening: Bidder's List & Project Totals
June 23, 2026 @ 2:00pm
Bidding Company / Firm
Bid Price
1 $171,048.06
st. Francis Electric $207,257.00
3 4
5 6
8 9
10 11
12 13
14 Opened By:
Dave Harden Attest:
Dalk
ontracted City Engineer
SECTION 00400
BID FORM
CITY OF WILLIAMS
BID FORM
NAME OF BIDDER: St. Francis Electric, LLC.
The undersigned bidder hereby declares that it has carefully examined the location of the proposed Work, and has read and examined the Contract Documents, including all plans, specifications, and all addenda, if any, for the following Project:
City of Williams Highway Safety Improvement Program, Intersection Improvements Project
We hereby propose to furnish all labor, materials, equipment, tools, transportation, and services, and to discharge all duties and obligations necessary and required to perform and complete the Project in strict accordance with the Contract Documents for the TOTAL BASE BID PRICE:
BASE BID SCHEDULE
NO. ITEM DESCRIPTION EST. UNIT LINE ITEM
UNIT
QTY. PRICE COST
1 MOBILIZATION LS 1 $16,000.00 $16,000.00
2 TRAFFIC CONTROL SYSTEM 1 $20,000.00 $20,000.00
3 WATER POLLUTION CONTROL PROGRAM LS 1 $5,249.80 $5,249.80 4 ROADSIDE SIGN - ONE POST EA 7 $1,500.00 $10,500.00
5 THERMOPLASTIC TRAFFIC STRIPE - DETAIL 1 LF 111 $2.60 $288.60 6 THERMOPLASTIC TRAFFIC STRIPE - DETAIL 22 LF 730 $6.60 $4,818.00 7 THERMOPLASTIC TRAFFIC STRIPE - DETAIL 21 LF 36 $6.60 $237.60 8 12-INCH LIMIT LINE SQFT 300 $20.00 $6,000.00
9 THERMOPLASTIC PAVEMENT MARKINGS SQFT 520 $16.00 $8,320.00 10 TRANSVERSE RUMBLE STRIPS LF 390 $5.10 $1,989.00
11 FLASHING STOP SIGN EA 7 $6,250.00 $43,750.00
12 SOLAR FLASHING BEACON SYSTEM EA $10,700.00 $74,900.00 13 REMOVE ROADSIDE SIGN EA 7 $500.00 |$3,500.00
14 REMOVE THERMOPLASTIC PAVEMENT MARKING SQFT 440 $10.60 $4,664.00 15 REMOVE THERMOPLASTIC TRAFFIC STRIPE LF 880 $8.00 $7,040.00 TOTAL BASE BID PRICE -____ S207,257.00
Bidders must provide pricing for every bid item. Base Bid items above are reflected in the project plans.
SECTION 00400
BID FORM
- 4-
SECTION 00400
BID FORM
The estimated quantities for unit price items are for purposes of comparing bids only and the City makes no representation that the actual quantities of work performed will not vary from the estimates.
In case of discrepancy between the unit price and the line item cost set forth for a unit price item, the line item cost, calculated at the unit price multiplied by the estimated quantity, shall prevail and shall be utilized as the basis for determining the lowest responsive, responsible bidder.
However, if the amount set forth as a unit price is ambiguous, unintelligible or uncertain for any cause, or is omitted, or is the same amount as the entry in the "Line Item Cost" column, then the amount set forth in the "Line Item Cost" column for the item shall prevail and shall be divided by the estimated quantity for the item and the price thus obtained shall be the unit price. If any of the above discrepancies exist, the City may recalculate the bid price on the basis of the unit price and the bidder agrees to be bound by such recalculation. Final payment for unit price items shall be determined by the City from measured quantities of work performed.
BASE BID PRICE (BASED ON BID SCHEDULE):
$ 207,257.00
Base Bid Price in Numbers
Two Hundred Seven Thousand Two Hundred Fifty Seven Dollars Base Bid Price in Written Form
In case of discrepancy between the written price and the numerical price, the written price shall prevail.
The contract shall be awarded to the contractor submitting the lowest responsible Base Bid Price or the Lowest total of the Combination of Base Bid Price plus Alternate Bid Price.
The undersigned agrees that this Bid Form constitutes a firm offer to the City which cannot be withdrawn for the number of calendar days from the bid opening stated in the Notice Inviting Bids from the bid opening, or until a Contract for the Work is fully executed by the City.
Bidders Name (Printed): Guy Smith - President
Bidders Signature: Ayf
Date: 06-23-2026
ALTERNATIVE BID
If the Contract Documents specify alternate bid items, the following Alternate Bid amounts shall SECTION 00400
BID FORM
- 5-
SECTION 00400
BID FORM
be added to the Base Bid Price entered above, at the City's sole option. The City can choose to include any, all or none of the Alternate Bid items in the Work. If the City selects any of the Alternate Bids items, the corresponding Alternate Bid prices shall be added to Base Bid Price for the Work. The City can select Alternate Bid items at any time. The Alternative Bid items reflect work indicated on the plan set.
ALTERNATIVE BID #1 SCHEDULE
NO. UNIT EST. UNIT LINE ITEM
ITEM DESCRIPTION PRICE
QTY. COST
HOT MIX ASPHALT (TYPE A) - GRIND & OVERLAY 2" TON 95 $630.00 $59,850.00 2 DEEP LIFT PATCHING (DIGOUT) SF 800 $25.00 $20,000.00
TOTAL BASE BID PRICE
------- -------- ------
$79,850.00
The Contract Time shall commence on the date stated in the City's Notice to Proceed or as stated above. In no case shall the Contractor commence construction prior to the date stated in the City's Notice to Proceed, or before providing the required bonds and evidence of insurance.
The contract shall be awarded to the contractor submitting the lowest responsible Base Bid Price or the lowest total of the Combination of Base Bid Price plus Alternate Bid Price.
ALTERNATE BID PRICE (BASED ON ALTERNATE BID SCHEDULE):
$ 79,850.00
Alternate Bid Price in Numbers
Seventy Nine Thousand Eight Hundred Fifty Dollars
Alternate Bid Price in Written Form
TOTAL COMBINATION OF BASE BID PRICE PLUS ALTERNATIVE BID PRICE Total of Base Bid Price Plus Alternate Bid Price 287,107.00 Two Hundred Eighty Seven Thousand One Hundred Seven Dollars Total of Base Bid Price Plus Alternate Bid Price in Written Form SECTION 00400
BID FORM
- 6-
SECTION 00400
BID FORM
In case of discrepancy between the written price and the numerical price, the written price shall prevail.
Bidders Name (Printed): Guy Smith - President
Bidders Signature:
Date: 06-23-2026
END OF BID FORM
SECTION 00400
BID FORM
- 7-
SECTION 00405
CONTRACTOR's CERTIFICATE REGARDING WORKERS' COMPENSATION
CONTRACTOR'S CERTIFICATE REGARDING WORKERS' COMPENSATION I am aware of the provisions of section 3700 of the Labor Code which require every employer to be insured against liability for workers' compensation or to undertake self- insurance in accordance with the provisions of that code, and I will comply with such provisions before commencing the performance of the work of this Contract.
Name of Bidder St. Francis Electric, LLC.
Signature Myt
Name Guy Smith
Title President
Dated 06-23-2026
END OF CONTRACTOR'S CERTIFICATE REGARDING WORKERS' COMPENSATION SECTION 00405
CONTRACTOR'S CERTIFICATE REGARDING WORKERS' COMPENSATION SECTION 00410
BID BOND
BID BOND
KNOW ALL PERSONS BY THESE PRESENTS that, _St. Francis Electric, LLC hereinafter called the PRINCIPAL, and_Everest National Insurance Company _ a corporation duly organized under the laws of the State of Delaware having its principal place of business at 100 Everest Way, Warren the State of New Jersey , and authorized to do business in the State of California, hereinafter called the SURETY, are held and firmly bound unto the City of Williams, hereinafter called the OBLIGEE, on order, in the sum of ten percent of amount bid Dollars ($10% of amount bid (being at least ten percent (10%) of the total amount of PRINCIPAL'S bid price) lawful money of the United States, for the payment of which we bind ourselves, our heirs, executors, administrators, successors, and assigns, jointly and severally, firmly by these presents.
THE CONDITIONS OF THIS OBLIGATION ARE SUCH THAT:
WHEREAS, the PRINCIPAL has submitted its Bid for the project entitled Highway Safety Improvement Program Intersection Improvements to the OBLIGEE, the Bid, by reference thereto; being hereby made a part hereof.
NOW, THEREFORE, if the Bid is rejected or, in the alternate, if the Bid is accepted and the PRINCIPAL signs and delivers a Contract and furnishes evidence of insurance and a Performance Bond and Payment Bond, all in the form and within the time required by the Contract Documents, then this obligation shall become null and void, otherwise the same shall remain in full force and effect and upon default of the PRINCIPAL shall be forfeited to the OBLIGEE, it being expressly understood and agreed that the liability of the SURETY for any and all default of the PRINCIPAL shall be the amount of this obligation as herein stated, as liquidated damages.
The SURETY, for value received, hereby agrees that its obligations and its bond shall not be impaired or affected by any extension of the time within which the OBLIGEE may accept the Bid, and the SURETY hereby waives notice of any such extension.
In the event suit is brought upon this Bond by the OBLIGEE and judgment is recovered, the SURETY shall pay, in addition to the sum set forth above, all costs incurred by the OBLIGEE in such suit, including reasonable attorney's fees and expert witness fees, to be fixed by the court, in addition to the penal sum of the Bond.
Signed this. 18th day of June _. 2026
Everest National Insurance Company St. Francis Electric, LLC BY: SURETY Andrea. O Neill Attorney-In-Fact BY: PRINCIPAL By Smith, President Note: Signature of person executing for Surety must be notarized and evidence of corporate authority attached.
END OF BID BOND
SECTION 00410
BID BOND
- 9-
82276.00009\9786230.1
ACKNOWLEDGMENT
A notary public or other officer completing this
certificate verifies only the identity of the individual who signed the document to which this certificate is
attached, and not the truthfulness, accuracy, or
State of California
County of Alameda
On 6/22/26 before me,_ Teresa Renee Felder, Notary Public (insert name and title of the officer)
personally appeared Guy Smith, President
who proved to me on the basis of satisfactory evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument.
I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct.
WITNESS my hand and official seal. TERESA RENEE FELDER
Notary Public - California
Alameda County
Commission # 2504520
My Comm. Expires Dec 13, 2028
sonatue Permanore (Seal)
ACKNOWLEDGMENT
A notary public or other officer completing this
attached, and not the truthfulness, accuracy, or
State of California Alameda
County of
On June 18, 2026 before me, - Ann Marie Lanza, Notary Public (insert name and title of the officer)
personally appeared Andrea O'Neill
who proved to me on the basis of satisfactory evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument.
I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct.
assassa
ANN MARIE LANZA
WITNESS my hand and official seal. COMM. #2471741
NOTARY PUBLIC • CALIFORNIA
ALAMEDA COUNTY
MY COMM. EXP. NOVEMBER. 14, 2027E
wwww
Signature (Seal)
L everest™
POWER OF ATTORNEY
EVEREST REINSURANCE COMPANY and EVEREST NATIONAL INSURANCE COMPANY Robert W. Babcock, Robert Terrence Murphy, Andrea ONeill, Catherine A. Pinney Such bonds and undertakings, when duly executed by the aforesaid Attorneys)-in-fact shall be binding upon the Company as fully and to the same extent as if such bonds and undertakings were signed by the President and Secretary of the Company and sealed with its corporate seal.
This Power of Attorney is granted and is signed by facsimile under and by the authority of the following Resolutions adopted by the Board of Directors of Company ("Board") on April 21, 2016:
RESOLVED, that the President, any Executive Vice President, and any Senior Vice President are hereby appointed by the Board as authorized to make, execute, seal and deliver for and on behalt of the Company, any and all bonds, undertakings, contracts or obligations in surety or co-surety with others and that the Secretary or any Assistant Secretary of the Company be and that each of them hereby is authorized to attest to the execution of any such bonds, undertakings, contracts or obligations in surety or co-surety and attach thereto the corporate seal of the Company.
RESOLVED, FURTHER, that the President, any Executive Vice President, and any Senior Vice President are hereby authorized to execute powers of attorney qualifying the attorney named in the given power of attorney to execute, on behalf of the Company, bonds and undertakings in surety or co-surety with others, and that the Secretary or any Assistant Secretary of the Company be, and that each of them is hereby authorized to attest the execution of any such power of attorney, and to attach thereto the corporate seal of the Company.
RESOLVED, FURTHER, that the signature of such officers named in the preceding resolutions and the corporate seal of the Company may be affixed to such powers of attorney or to any certificate relating thereto by facsimile, and any such power of attorney or certificate bearing such facsimile signatures or facsimile seal shall be thereafter valid and binding upon the Company with respect to any bond, undertaking, contract or obligation in surety or co-surety with others to which it is attached.
IN WITNESS WHEREOF, Everest Reinsurance Company and Everest National Insurance Company have caused their corporate seals to be affixed hereto, and these presents to be signed by their duly authorized officers this 10th day of October 2023.
Reinsurance дола Insurance Everest Reinsurance Company and Everest National Insurance Company
CORPORAT CORPORATE
SEAL company SEAL
Everest 1973 1985 Comp
DELAWARE Sanan DELAWARE
By: Anthony Romano, Senior Vice President
On this 22nd of March 2023, before me personally came Anthony Romano, known to me, who, being duly sworn, did execute the above instrument; that he knows the seal o said Company; that the seal affixed to the aforesaid instrument is such corporate seal and was affixed thereto; and that he executed said instrument by like order.
LINDA ROBINS
Notary Public, State of New York
No 01R06239736 Rule Phons
Qualified in Queens Count
Term Expires April 25, 2021
Linda Robins, Notary Public
1, Sylvia Semerdjian, Assistant Secretary of Everest Reinsurance Company and Everest National Insurance Company do hereby certify that I have compared the foregoing copy of the Power of Attorney and affidavit, and the copy of the Section of the bylaws and resolutions of said Corporation as set forth in said Power of Attorney, with the ORIGINALS ON FILE IN THE HOME OFFICE OF SAID CORPORATION, and that the same are correct transcripts thereof, and of the whole of the said originals, and that the said Power IN WITNESS WHEREOF, I have hereunto set my hand and affixed the seal of said Company, this 18th day of June 2026 Reinsurance
CORPORATE CORPORATE
SEAL SEAL
1973
1985
DELAWARE
DELAWARE,
By: Sylvia Semerdjian, Assistant Secretary
SECTION 00420
NON-COLLUSION DECLARATION
NON-COLLUSION DECLARATION
TO BE EXECUTED BY BIDDER AND SUBMITTED WITH BID
The undersigned declares:
I am the • President of St. Francis Electric, LLC., the party making the foregoing bid.
The bid is not made in the interest of, or on behalf of, any undisclosed erson, partnership, company, association, organization, or corporation. The bid is enuine and not collusive or sham. The bidder has not directly or indirectly induced o solicited any other bidder to put in a false or sham bid. The bidder has not directly or indirectly colluded, conspired, connived, or agreed with any bidder or anyone else to put in a sham bid, or to refrain from bidding. The bidder has not in any manner, directly or indirectly, sought by agreement, communication, or conference with anyone to fix the bid price of the bidder or any other bidder, or to fix any overhead, profit, or cost element of the bid price, or of that of any other bidder. All statements contained in the bid are true.
The bidder has not, directly or indirectly, submitted his or her bid price or any breakdown thereof, or the contents thereof, or divulged information or data relative thereto, to any corporation, partnership, company association, organization, bid depository, or to any member or agent thereof to effectuate a collusive or sham bid, and has not paid, and will not pay, any person or entity for such purpose.
Any person executing this declaration on behalf of a bidder that is a corporation, partnership, joint venture, limited liability company, limited liability partnership, or any other entity, hereby represents that he or she has full power to execute, and does execute, this declaration on behalf of the bidder.
I declare under penalty of perjury under the laws of the State of California that the foregoing is true and correct and that this declaration is executed on 06-23-2026 San Leandro _[city],
California
(Print Name)
President
(Print Title)
06-23-2026
(Date)
END OF NON-COLLUSION DECLARATION
SECTION 00420
NON-COLLUSION DECLARATION
- 10 -
SECTION 00440
LIST OF SUBCONTRACTORS FORM
LIST OF SUBCONTRACTORS FORM
In compliance with the Subletting and Subcontracting Fair Practices Act of the Public Contract Code of the State of California, each bidder shall set forth below: (a) the name, contractor's license number, DIR registration number and the location of the place of business of and (b) the portion of the work which will be done by each subcontractor who will perform work or labor or render service to the Contractor in or about the construction of the work in an amount in excess of one-half of one percent (1/2%) of the Contractor's Total Bid Price. Notwithstanding the foregoing, if the work involves streets and highways, then the Contractor shall list each subcontractor who will perform work or labor or render service to Contractor in or about the work in an amount in excess of one-half of one percent (1/2%) of the Contractor's Total Bid Price or $10,000, whichever is greater. The intymatt within its sole discretion, grant additional time to provide the below requested If no subcontractor is specified for a portion of the Work, or if more than one subcontractor is specified for the same portion of Work, to be performed under the Contract in excess of one-half of one percent (1/2%) of the Contractor's Total Bid Price or $10,000, whichever is greater, or if the work involves streets or highways, then the Contractor shall be deemed to have agreed that it is fully qualified to perform that Work, and that it shall perform that portion itself.
Portion of CSLB DIR
Subcontractor Location of Registration
Work Business License
Number Number
Striping Scope Striping Graphics 501 Aaron Street 576756 1000006495 Cotati, CA 94931
Grind and Overlay Lamon Construction 871 Von Geldern Way 17482 1000000569 Pat Ding Lift uba City, CA 9599
SECTION 00440
LIST OF SUBCONTRACTORS FORM
- 11 -
SECTION 00440
LIST OF SUBCONTRACTORS FORM
Portion of Location of CSLB DIR
Work Subcontractor Business License Registration
Number Number
Name of Bidder St. Francis Electric, LLC.
-
Signature
Name and Title Guy Smith - President
Dated 06-23-2026
END OF LIST OF SUBCONTRACTORS FORM
SECTION 00440
LIST OF SUBCONTRACTORS FORM
- 12-
SECTION 00441
PUBLIC WORKS CONTRACTOR REGISTRATION CERTIFICATION
PUBLIC WORKS CONTRACTOR REGISTRATION CERTIFICATION
Pursuant to Labor Code sections 1725.5 and 1771.1, all contractors and subcontractors that wish to bid on, be listed in a bid proposal, or enter into a contract to perform public work must be registered with the Department of Industrial Relations. See http://www.dir.ca.gov/Public-Works/PublicWorks.html for additional information.
No bid will be accepted nor any contract entered into without proof of the contractor's and subcontractors' current registration with the Department of Industrial Relations to perform public work.
Bidder hereby certifies that it is aware of the registration requirements set forth in Labor Code sections 1725.5 and 1771.1 and is currently registered as a contractor with the Department of Industrial Relations.
Name of Bidder: St. Francis Electric, LLC.
DIR Registration Number: 1000022208
Bidder further acknowledges:
Bidder shall maintain a current DIR registration for the duration of the project.
Bidder shall include the requirements of Labor Code sections 1725.5 and 1771.1 in its contract with subcontractors and ensure that all subcontractors are registered at the time of bid opening and maintain registration status for the duration of the project.
Failure to submit this form or comply with any of the above requirements may result in a finding that the bid is non-responsive. signatures it
Name and Title: Guy Smith - President
Dated: 06-23-2026
END PUBLIC WORKS CONTRACTOR REGISTRATION CERTIFICATION
SECTION 00441
PUBLIC WORKS CONTRACTOR REGISTRATION CERTIFICATION
13 RESOLUTION NO. 26-37
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF WILLIAMS
AWARDING THE CONSTRUCTION CONTRACT FOR THE HIGHWAY SAFETY
IMPROVEMENT PROGRAM (HSIP) INTERSECTION IMPROVEMENTS PROJECT (CITY PROJECT NO. 02-2026, CONTRACT NO. 02-26, HSIP UNIQUE PROJECT ID H11-03-025) TO ST. FRANCIS ELECTRIC, LLC.
WHEREAS, the City of Williams (“City”) is undertaking the HSIP Intersection Improvements Project (“Project”), City Project No. 02-2026, Contract No. 02-26, HSIP Unique Project ID H11- 03-025; and
WHEREAS, the Project consists generally of the construction of intersection pavement markings, the installation of flashing beacons as advance warning, and the installation of transverse rumble strips on intersection approaches, together with all appurtenant work; and WHEREAS, the Project is funded in part through the Highway Safety Improvement Program (HSIP), administered by the California Department of Transportation (Caltrans), a data-driven safety program intended to reduce fatalities and serious injuries on public roadways; and WHEREAS, following City Council adoption on May 20, 2026 of the plans, specifications and working details, and to advertise the Project, the City advertised the Project for competitive public bidding in accordance with Public Contract Code Section 22039; and WHEREAS, sealed bids for the Project were publicly opened and read aloud on June 22, 2026, and two (2) bids were received; and
WHEREAS, the apparent low bidder, Vaca Valley Excavating & Trucking, Inc., was deemed non-responsive due to lack of subcontractor inclusion, and St. Francis Electric, LLC. is the lowest responsive and responsible bidder for the Project, holding a current and active California Class A and C-10 (Electrical) contractor's license and being registered with the California Department of Industrial Relations; and
WHEREAS, the successful bidder will be required to furnish a Faithful Performance Bond and a Labor and Material Payment Bond, each in an amount equal to 100 percent of the Contract Price; and
WHEREAS, the City Council has reviewed the bid results and the recommendation of staff and desires to award the construction contract for the Project.
NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF WILLIAMS DOES HEREBY RESOLVE AS FOLLOWS:
Section 1. Recitals. The above recitals are true and correct and are incorporated herein by reference.
Section 2. Award of Construction Contract. The City Council hereby awards the construction contract for the HSIP Intersection Improvements Project, City Project No. 02-2026, Contract No. 02-26, to St. Francis Electric, LLC., as the lowest responsive and responsible bidder, in the total amount of $287,107.00 (Base Bid of $207,257.00 plus Alternate Bid No. 1 of $79,850.00).
Section 3. Authorization to Execute Contract. The City Manager, or designee, is hereby authorized to execute the construction contract and all related documents on behalf of the City, subject to St. Francis Electric, LLC.'s furnishing of the required payment and performance bonds, insurance, and other required Contract Documents.
Section 4. Construction Contingency and Change Orders. The City Council hereby approves a construction contingency in the amount of $28,711.00 (approximately ten percent of the Contract Price) and authorizes the City Manager, or designee, to approve and execute change orders to the construction contract that do not individually or cumulatively exceed the approved contingency amount, in accordance with the City's purchasing policy and applicable law.
Section 5. Further Actions. Staff is directed to take all actions necessary to implement this Resolution and the HSIP Intersection Improvements Project.
Section 6. Effective Date. This Resolution shall take effect immediately upon adoption.
PASSED AND ADOPTED by the City Council of the City of Williams at a regular meeting held on the 21st day of October, 2026, by the following vote:
AYES:
NOES:
ABSENT:
ABSTAIN:
_______________________________________
Kate Dunlap, Mayor
ATTEST:
_______________________________________
City Clerk, City of Williams
APPROVED AS TO FORM:
_______________________________________
Andreas Booher, City Attorney
City of Williams DATE: October 21, 2026
City Council ITEM #: 13.
Agenda Report CATEGORY: NEW BUSINESS
SUBJECT: Award of Construction Contract – Highway Safety Improvement Program (HSIP) Pedestrian Improvements (City Contract No. 03-26, City Project No. 03-2026, HSIP Unique Project ID: H11-03-026)
BACKGROUND
The City of Williams has been awarded federal funding under the Highway Safety Improvement Program (HSIP) administered by the California Department of Transportation (Caltrans). HSIP is a federally funded, data-driven safety program established under Title 23, United States Code, Section 148, intended to reduce fatalities and serious injuries on public roadways. The HSIP Pedestrian Improvements Project at 8th Street and F Street, is one of two active HSIP projects in the City ready to advance to construction.
The intersection of 8th Street and F Street has been identified as a priority pedestrian safety location through the Local Road Safety Plan. The existing intersection lacks ADA-compliant curb ramps, adequate crosswalk markings, and appropriate warning devices, creating conditions that increase the risk of pedestrian-involved collisions. This project addresses those deficiencies through targeted infrastructure improvements to improve visibility, accessibility, and motorist awareness.
Following City Council authorization on May 20, 2026, to adopt the plans and specifications and advertise the project, staff advertised the HSIP Pedestrian Improvements Project for competitive construction bids in accordance with Public Contract Code Section 22039. The City publicly opened bids for the HSIP Pedestrian Improvements Project on June 22, 2026. Three bids were received, and FBD Vanguard Construction, Inc. submitted the lowest responsive base bid. Staff has reviewed the bid results and is bringing this item to the City Council for award of the construction contract.
DISCUSSION
The HSIP Pedestrian Improvements Project will construct pedestrian safety and accessibility improvements at the intersection of 8th Street and F Street. The project scope includes the following:
ADA-compliant curb ramp reconstruction with detectable warning surfaces New curb and gutter and sidewalk reconstruction
Stamped concrete median nose treatment
Solar-powered rectangular rapid flashing beacon (RRFB)
Ladder crosswalk markings and thermoplastic pavement markings Updated regulatory and warning signage
Demolition of existing non-conforming improvements and reconstruction to current City and Caltrans standards
Pavement grind and overlay (Alternate Bid Item – City-funded if accepted) The engineer's estimate, dated May 6, 2026, totaled $392,150.00. Bid results for City Contract No. 03-26 are summarized below:
Bidder Base Bid Base Bid + Alt. No.
1 FBD Vanguard Construction, Inc. —
lowest responsive bidder
$208,124.00 $258,974.00
All-American Construction, Inc. $252,035.00 $296,135.00 Vaca Valley Excavating & Trucking, Inc. $289,735.44 $333,468.24 Engineer's Estimate (Base Bid Schedule) $293,340.00 —
FBD Vanguard Construction, Inc. submitted the lowest base bid ($208,124.00, 29% below the engineer's estimate) and remains lowest with Alternate Bid Item No. 1 included ($258,974.00).
FBD Vanguard holds a current, active CSLB license (No. 833032; Classifications A, B, C-8) and DIR registration (No. 1000008493), and submitted the required bid bond and Non-Collusion Declaration. Staff has determined FBD Vanguard Construction, Inc. to be the lowest responsive and responsible bidder.
Staff recommends awarding both the Base Bid and Alternate Bid Item No. 1 to FBD Vanguard.
The regrind and overlay work was competitively priced at $50,850.00, and completing it now avoids a separate future mobilization at this intersection.
FISCAL IMPACT
The total estimated project cost is $336,021.40, covering the construction contract, a construction contingency, and construction engineering/construction management (CE/CM), as broken down below:
Cost Component Amount
Construction Contract (Base Bid + Alternate Bid No. 1) – FBD Vanguard
$258,974.00
Construction Contingency (10%) $25,897.40
Construction Engineering / Construction Management (CE/CM) $51,150.00 Total Project Cost $336,021.40
The project funding breakdown is as follows:
Funding Source Amount Notes
HSIP Federal Funds (State-administered) $221,316.29 85.36% of participating costs (Base Bid +
CE/CM); subject to
Caltrans confirmation
City Local Match (participating costs) $37,957.71 Included in adopted CIP budget
City Funds (non-participating – Alternate Bid
No. 1)
$50,850.00 Recommended for award
with the Base Bid
City Construction Contingency (10%) $25,897.40 City-funded reserve for change orders
Total Project Cost $336,021.40 With Alternate Bid
included
The awarded bid is $53,368.60 below the $389,390 project budget previously adopted by the City Council. The required local match ($37,957.71) is within the $41,412.43 already appropriated in the Capital Improvement Program budget. The total grant funding allocated was $299,430. Final allocation between HSIP federal funds and City local match will be confirmed with Caltrans Local Assistance prior to contract execution.
RECOMMENDATION
Staff recommends the City Council:
1. Approve Resolution 26-38 and find FBD Vanguard Construction, Inc. to be the lowest responsive and responsible bidder for City Contract No. 03-26;
2. Award the construction contract to FBD Vanguard Construction, Inc. in the amount of $258,974.00 (Base Bid of $208,124.00 plus Alternate Bid Item No. 1 of $50,850.00);
3. Authorize the City Manager to execute the construction contract and related documents, subject to FBD Vanguard's timely submission of the required performance bond, payment bond, insurance certificates, and executed contract; and
4. Approve a 10% construction contingency ($25,897.40) for unanticipated changes and contract change orders, for a total construction budget not to exceed $284,871.40.
Prepared and Submitted by: Dave Harden, PE, City Engineer Attachments:
Bid Comparison Summary – City Contract No. 03-26, HSIP Pedestrian Improvements Bid Opening Results, June 22, 2026
FBD Vanguard Construction, Inc. – Bid Documents
Resolution 26-38 Awarding HSIP Pedestrian Improvements
NO. ITEM DESCRIPTION UNIT EST. QTY. UNIT PRICE LINE ITEM COST UNIT PRICE LINE ITEM COST UNIT PRICE LINE ITEM COST 1 MOBILIZATION LS 1 $18,000.00 $18,000.00 $26,335.81 $26,335.81 $20,000.00 $20,000.002 TRAFFIC CONTROL SYSTEM LS 1 $32,000.00 $32,000.00 $52,825.80 $52,825.80 $14,180.00 $14,180.003 WATER POLLUTION CONTROL PROGRAM LS 1 $1,800.00 $1,800.00 $1,272.91 $1,272.91 $2,200.00 $2,200.004 ROADSIDE SIGN EA 11 $250.00 $2,750.00 $700.10 $7,701.10 $114.00 $1,254.005 RECTANGULAR RAPID FLASHING BEACON SYSTEM LS 1 $37,884.00 $37,884.00 $31,186.32 $31,186.32 $40,300.00 $40,300.00 6 THERMOPLASTIC 12-INCH LIMIT LINE SQFT 30 $23.00 $690.00 $15.28 $458.40 $26.50 $795.007 THERMOPLASTIC PAVEMENT MARKING SQFT 800 $7.42 $5,936.00 $20.37 $16,296.00 $8.50 $6,800.008 REMOVE ROADSIDE SIGN EA 2 $175.00 $350.00 $318.23 $636.46 $690.00 $1,380.009 REMOVE THERMOPLASTIC PAVEMENT MARKING SQFT 100 $22.75 $2,275.00 $5.09 $509.00 $26.00 $2,600.00 10 HOT MIX ASPHALT (TYPE A) - ROADWAY CONFORM TON 20 $1,250.00 $25,000.00 $656.83 $13,136.60 $617.06 $12,340.00 11 MINOR CONCRETE (MEDIAN TYPE A1-8) LF 120 $85.00 $10,200.00 $88.68 $10,641.60 $103.00 $12,360.0012 MINOR CONCRETE (SIDEWALK) SQFT 240 $24.00 $5,760.00 $27.60 $6,624.00 $18.00 $4,320.0013 MINOR CONCRETE (CURB RAMP) SQFT 490 $45.00 $22,050.00 $36.03 $17,654.70 $35.00 $17,150.0014 MINOR CONCRETE (VALLEY GUTTER) SQFT 140 $37.00 $5,180.00 $29.20 $4,088.00 $18.00 $2,520.0015 MINOR CONCRETE (CURB AND GUTTER) LF 140 $81.00 $11,340.00 $73.40 $10,276.00 $55.00 $7,700.0016 STAMPED AND COLORED CONCRETE MEDIAN PAVING SQFT 240 $36.00 $8,640.00 $35.76 $8,582.40 $60.00 $14,400.00 17 PEDESTRIAN PASSAGEWAY (TYPE A) EA 2 $6,500.00 $13,000.00 $3,672.01 $7,344.02 $3,500.00 $7,000.0018 CLASS 2 AGGREGATE BASE CY 50 $380.50 $19,025.00 $458.18 $22,909.00 $50.00 $2,500.0019 REMOVE CONCRETE (CURB & GUTTER, SIDEWALK, VALLEY GUTTER) SQFT 1180 $6.00 $7,080.00 $18.16 $21,428.80 $25.00 $29,500.0020 ROADWAY EXCAVATION CY 50 $420.50 $21,025.00 $468.71 $23,435.50 $150.00 $7,500.0021 LANDSCAPING (NATIVE FILL AND SEEDING) LS 1 $1,500.00 $1,500.00 $6,011.02 $6,011.02 $700.00 $700.0022 TRAFFIC STRIPE - DETAIL 26 LF 50 $11.00 $550.00 $7.64 $382.00 $12.50 $625.00 $252,035.00 $289,735.44 $208,124.00
$296,135.00 $333,468.24 $258,974.00
TOTAL BASE BID PRICE
LOW BIDDER
Total Base + Altenative
CITY OF WILLIAMS
HSIP PEDESTRIAN IMPROVMENTS PROJECT:
BID COMPARISON SUMMARY
ALL AMERICAN VACA VALLEY FBD VANGUARD
ROUNDED 1814
CITY OF WILLIAMS
HSIP Pedestrian Improvements Project
Bid Opening: Bidder's List & Project Totals
June 23, 2026 @ 2:00pm
Bidding Company / Firm Bid Price
1 Vaca Valley $ 289.735.44
All American Construction $ 252.035.00
3 FBD Vanguard $208124.00
4 5
6 7
8 9
10 11
12 13
14 Opened By:
Dave Harden Attest:
Contracted City Engineer
SECTION 00400
BID FORM
CITY OF WILLIAMS
BID FORM
NAME OF BIDDER:_ FBD Vanguard Construction Inc.
The undersigned bidder hereby declares that it has carefully examined the location of the proposed Work, and has read and examined the Contract Documents, including all plans, specifications, and all addenda, if any, for the following Project:
Williams Highway Safety Improvement Program, Pedestrian Improvements Project We hereby propose to furnish all labor, materials, equipment, tools, transportation, and services, and to discharge all duties and obligations necessary and required to perform and complete the Project in strict accordance with the Contract Documents for the TOTAL BASE BID PRICE:
BASE BID SCHEDULE
EST. UNIT LINE ITEM
NO. ITEM DESCRIPTION UNIT
QTY. PRICE COST
1 MOBILIZATION 1 LS 20,000,020,000.00
2 TRAFFIC CONTROL SYSTEM 1 LS 14,180.00 14,180.00
3 WATER POLLUTION CONTROL PROGRAM 1 LS 2200.°0 2,200.00 4 ROADSIDE SIGN 11 EA 114.00 1,254.00
5 RECTANGULAR RAPID FLASHING BEACON SYSTEM 1 LS 40,300.00 40, 200.00 6 THERMOPLASTIC 12-INCH LIMIT LINE 30 SQFT 26.50 795,00 THERMOPLASTIC PAVEMENT MARKING 800 SQFT 8.50 6,800.00
8 REMOVE ROADSIDE SIGN 2 EA 690.00 1,380.00
REMOVE THERMOPLASTIC PAVEMENT MARKING 100 SQFT 26.00 2 600.00 10 HOT MIX ASPHALT (TYPE A) - ROADWAY CONFORM 20 TON 617.00 12, 340.00 MINOR CONCRETE (MEDIAN TYPE A1-8) 120 LF 103.00 12,360.00 12 MINOR CONCRETE (SIDEWALK 240 SQFT 18.004320.00
13 MINOR CONCRETE (CURB RAMP) 490 SQFT 35.00 17,150.00
MINOR CONCRETE (VALLEY GUTTER) 140 SQFT 18.00 2,520.00
MINOR CONCRETE CUR AND GUTTER) 140 LF 55.00 7,700.00
STAMPED AND COLORED CONCRETE MEDIAN PAVING 240 SQFT 60.00 14, 400.00 PEDESTRIAN PASSAGEWAY (TYPE A) 2 EA 3,500.00 7,000.00
CLASS 2 AGGREGATE BASE 50 CY 50.00 2,500,00
19 REMOVE CONCRETE (CURB & GUTTER, SIDEWALK, VALLEY
GUTTER) 1180 SQFT 25.00 29,500.00
20 ROADWAY EXCAVATION 50 CY 150.00 7,500.00
SECTION 00400
BID FORM
- 4 -
SECTION 00400
BID FORM
21 LANDSCAPING (NATIVE FILL AND SEEDING) 1 LS 700.00 700.00 22 TRAFFIC STRIPE - DETAIL 26 50 LF 12.50 625.00
TOTAL BASE BID PRICE
Bidders must provide pricing for every bid item. Base Bid items above are reflected i4.00 project plans.
The estimated quantities for unit price items are for purposes of comparing bids only and the City makes no representation that the actual quantities of work performed will not vary from the estimates.
In case of discrepancy between the unit price and the line item cost set forth for a unit price item, the line item cost, calculated at the unit price multiplied by the estimated quantity, shall prevail and shall be utilized as the basis for determining the lowest responsive, responsible bidder.
However, if the amount set forth as a unit price is ambiguous, unintelligible or uncertain for any cause, or is omitted, or is the same amount as the entry in the "Line Item Cost" column, then the amount set forth in the "Line Item Cost" column for the item shall prevail and shall be divided by the estimated quantity for the item and the price thus obtained shall be the unit price. If any of the above discrepancies exist, the City may recalculate the bid price on the basis of the unit price and the bidder agrees to be bound by such recalculation. Final payment for unit price items shall be determined by the City from measured quantities of work performed.
BASE BID PRICE (BASED ON BID SCHEDULE):
$ 208,12.4.00
Base Bid Price in Numbers
Two hundred eight thousand, one hundred twenty four dollars Base Bid Price in Written Form
In case of discrepancy between the written price and the numerical price, the written price shall prevail.
The contract shall be awarded to the contractor submitting the lowest responsible Base Bid Price or the Lowest total of the Combination of Base Bid Price plus Alternate Bid Price.
The undersigned agrees that this Bid Form constitutes a firm offer to the City which cannot be withdrawn for the number of calendar days from the bid opening stated in the Notice Inviting Bids from the bid opening, or until a Contract for the Work is fully executed by the City.
SECTION 00400
BID FORM
- 5-
SECTION 00400
BID FORM
Bidders Name (Printed): FBD Vanguard Construction Inc.
Bidders Signature: Billie Sposeto, President
Date: 06/22/26
ALTERNATIVE BID
If the Contract Documents specify alternate bid items, the following Alternate Bid amounts shall be added to the Base Bid Price entered above, at the City's sole option. The City can choose to include any, all or none of the Alternate Bid items in the Work. If the City selects any of the Alternate Bids items, the corresponding Alternate Bid prices shall be added to Base Bid Price for the Work. The City can select Alternate Bid items at any time. The Alternative Bid items reflect work indicated on the plan set.
ALTERNATIVE BID #1 SCHEDULE
UNIT EST. UNIT LINE ITEM
NO. ITEM DESCRIPTION
QTY. PRICE COST
1 HOT MIX ASPHALT (TYPE A) - GRIND & OVERLAY 2" TON 90 565.00 50,850.00 TOTAL BASE BID PRICE ---- -------- ----- 50,850.00
The Contract Time shall commence on the date stated in the City's Notice to Proceed or as stated above. In no case shall the Contractor commence construction prior to the date stated in the City's Notice to Proceed, or before providing the required bonds and evidence of insurance.
The contract shall be awarded to the contractor submitting the lowest responsible Base Bid Price or the lowest total of the Combination of Base Bid Price plus Alternate Bid Price.
ALTERNATE BID PRICE (BASED ON ALTERNATE BID SCHEDULE):
$ 50,850.00
Alternate Bid Price in Numbers
ifty thonsand, eight hundred fifty dollars
Alternate Bid Price in Written Form
TOTAL COMBINATION OF BASE BID PRICE PLUS ALTERNATIVE BID PRICE SECTION 00400
BID FORM
- 6-
• SECTION 00400
BID FORM
258, 974.00
Total of Base Bid Price Plus Alternate Bid Price
Two hundred fifty eight thousand, nine hundred seventy four.
Total of Base Bid Price Plus Alternate Bid Price in Written Form dollars In case of discrepancy between the written price and the numerical price, the written price shall prevail.
Bidders Name (Printed): EBD Vanguard Construction Inc.
Bidders Signature: Billie Sposeto. President
1222120
Date:
END OF BID FORM
SECTION 00400
BID FORM
- 7-
SECTION 00405
CONTRACTOr's CertIFIcaTe REgARdIng Workers' CoMpEnSatIon
CONTRACTOR'S CERTIFICATE REGARDING WORKERS' COMPENSATION I am aware of the provisions of section 3700 of the Labor Code which require every employer to be insured against liability for workers' compensation or to undertake self- insurance in accordance with the provisions of that code, and I will comply with such provisions before commencing the performance of the work of this Contract.
Name of Bidder FBD Vanguard Construction Inc.
Signature Hee freed
Name Billie Sposeto
Title President
Dated_ 06/22124
END OF CONTRACTOR'S CERTIFICATE REGARDING WORKERS' COMPENSATION SECTION 00405
CONTRACTOR's CERTIFICATE REGARDING WORKERS' COMPENSATION - 8 -
Bond No. CSBA-35369
SECTION 00410
BID BOND
BID BOND
KNOW ALL PERSONS BY THESE PRESENTS that, FBD Vanguard Construction, Inc. hereinatter called the PRINCIPAL, and Travelers Casualty and Surety Company of America: a corporation duly organized under the laws of the State ot Connecticut having its principal place of business at One Tower Square, Hartford in the State of Connecticut _, and authorized to do business in the State of California, hereinafter called the SURETY, are held and firmly bound unto the City of Williams, hereinafter called the OBLIGEE, on order, in the sum of Ten Percent of the Amount Bid Dollars ($10% _ (being at least ten percent (10%) of the total amount of PRINCIPAL'S bid price) lawful money of the United States, for the payment of which we bind ourselves, our heirs, executors, administrators, successors, and assigns, jointly and severally, firmly by these presents.
THE CONDITIONS OF THIS OBLIGATION ARE SUCH THAT:
WHEREAS, the PRINCIPAL has submitted its Bid for the project entitled to the OBLIGEE, the Bid, by reference
thereto; being hereby made a part hereof
*Contract No. 03-26, Williams Highway Safety Improvement Program, Pedestrian Improvements Project, HSIP Unique Project ID: H11-03-026, State Project No. 5246(010) NOW, THEREFORE, if the Bid is rejected or, in the alternate, if the Bid is accepted and the PRINCIPAL signs and delivers a Contract and furnishes evidence of insurance and a Performance Bond and Payment Bond, all in the form and within the time required by the Contract Documents, then this obligation shall become null and void, otherwise the same shall remain in full force and effect and upon default of the PRINCIPAL shall be forfeited to the OBLIGEE, it being expressly understood and agreed that the liability of the SURETY for any and all default of the PRINCIPAL shall be the amount of this obligation as herein stated, as liquidated damages.
The SURETY, for value received, hereby agrees that its obligations and its bond shall not be impaired or affected by any extension of the time within which the OBLIGEE may accept the Bid, and the SURETY hereby waives notice of any such extension.
In the event suit is brought upon this Bond by the OBLIGEE and judgment is recovered, the SURETY shall pay, in addition to the sum set forth above, all costs incurred by the OBLIGEE in such suit, including reasonable attorney's fees and expert witness fees, to be fixed by the court, in addition to the penal sum of the Bond.
Signed this 16th day of June _ 2026.
Travelers Casualty and Surety Company of America FBD Vanguard Construction, Inc.
BY: SURETY Chelsea Liberatore, Attorney-in-Fact BY: PRINCIPAL Bittie Sposeto, president Note: Signature of person executing for Surety must be notarized and evidence of corporate authority attached.
END OF BID BOND
SECTION 00410
BID BOND
- 9 -
82276.00009\9786230.1
ACKNOWLEDGMENT
A notary public or other officer completing this
certificate verifies only the identity of the individual who signed the document to which this certificate is
attached, and not the truthfulness, accuracy, or
validity of that document.
State of California
County of Sacramento
JUN 1 6 2026 Zachary Galvin Liberatore, Notary Public
On before me, -
(insert name and title of the officer)
personally appeared_ Chelsea Liberatore
who proved to me on the basis of satisfactory evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument.
I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct.
WITNESS my hand and official seal. ZACHARY GALVIN LIBERATORE Notary Public - California
Sacramento County
Commission # 2479099
My Comm. Expires Jan 9, 2028
Signature. (Seal)
Bond No. CSBA-35369
Travelers Casualty and Surety Company of America
Travelers Casualty and Surety Company
TRAVELERSJ St. Paul Fire and Marine Insurance Company
POWER OF ATTORNEY
Travelers Casualty and Surety Company of America, Travelers Casualty and Surety Company, and St. Paul Fire and Marine Insurance Company are corporations duly organized under the laws of the State of Connecticut (herein collectively called the "Companies"), and the Companies do hereby make, constitute and appoint Arturo Ayala, Daniel Huckabay, Adrian Langrell, Chelsea Liberatore, Stephanie McClain, Frank Morones, Shaunna Rozelle Ostrom, Dwight Reilly, Ben Stong, Benjamin Wolfe, Magdalena R Wolfe, and Robert Wood of Orange, California, their true and lawful Attorneys)- in-Fact to sign, execute, seal and acknowledge any and all bonds, recognizances, conditional undertakings and other writings obligatory in the nature thereof on behalf of the Companies in their business of guaranteeing the fidelity of persons, guaranteeing the performance of contracts and executing or guaranteeing bonds and undertakings required or permitted in any actions or proceedings allowed by law.
IN WITNESS WHEREOF, the Companies have caused this instrument to be signed, and their corporate seals to be hereto affixed, this 16th day of February, 2024.
SEAL SEAL SEAL
State of Connecticut
City of Hartford ss.
On this the 16th day of February, 2024, before me personally appeared Bryce Grissom, who acknowledged himself to be the Senior Vice President of each of the Companies, and that he, as such, being authorized so to do, executed the foregoing instrument for the purposes therein contained by signing on behalf of said Companies by himself as a duly authorized officer.
IN WITNESS WHEREOF, I hereunto set my hand and official seal.
Anna P. Nail
My Commission expires the 30th day of June, 2026 NOTARY -070
PUBLIC Anna P. Nowik, Notary Public
This Power of Attorney is granted under and by the authority of the following resolutions adopted by the Boards of Directors of each of the Companies, which resolutions are now in full force and effect, reading as follows:
RESOLVED, that the Chairman, the President, any Vice Chairman, any Executive Vice President, any Senior Vice President, any Vice President, any Second Vice President, the Treasurer, any Assistant Treasurer, the Corporate Secretary or any Assistant Secretary may appoint Attorneys-in-Fact and Agents to act for and on behalf of the Company and may give such appointee such authority as his or her certificate of authority may prescribe to sign with the Company's name and seal with the Company's seal bonds, recognizances, contracts of indemnity, and other writings obligatory in the nature of a bond, recognizance, or conditional undertaking, and any of said officers or the Board of Directors at any time may remove any such appointee and revoke the power given him or her; and it is
FURTHER RESOLVED, that the Chairman, the President, any Vice Chairman, any Executive Vice President, any Senior Vice President or any Vice President may delegate all or any part of the foregoing authority to one or more officers or employees of this Company, provided that each such delegation is in writing and a copy thereof is filed in the office of the Secretary; and it is FURTHER RESOLVED, that any bond, recognizance, contract of indemnity, or writing obligatory in the nature of a bond, recognizance, or conditional undertaking shall be valid and binding upon the Company when (a) signed by the President, any Vice Chairman, any Executive Vice President, any or more Company officers pursuant to a written delegation of authority; and it is FURTHER RESOLVED, that the signature of each of the following officers: President, any Executive Vice President, any Senior Vice President, any Vice President, any Assistant Vice President, any Secretary, any Assistant Secretary, and the seal of the Company may be affixed by facsimile to any Power of Attorney or to any certificate relating thereto appointing Resident Vice Presidents, Resident Assistant Secretaries or Attorneys-in-Fact for purposes only of executing and attesting bonds and undertakings and other writings obligatory in the nature thereof, and any such Power of Attorney or certificate bearing such facsimile signature or facsimile seal shall be valid and binding upon the Company and any such power so executed and certified by such facsimile signature and facsimile seal shall be valid and binding on the Company in the future with respect to any bond or understanding to which it is attached.
1, Kevin E. Hughes, the undersigned, Assistant Secretary of each of the Companies, do hereby certify that the above and foregoing is a true and correct copy of the Power of Attorney executed by said Companies, which remains in full force and effect.
Dated this 16th day of June 2026
SEAL SEAL SEAL
Kevin E helsitant Secretary E Hayden
To verify the authenticity of this Power of Attorney, please call us at 1-800-421-3880.
Please refer to the above-named Attorney(s)-in-Fact and the details of the bond to which this Power of Attorney is attached.
SECTION 00420
NON-COLLUSION DECLARATION
NON-COLLUSION DECLARATION
TO BE EXECUTED BY BIDDER AND SUBMITTED WITH BID
The undersigned declares:
FBD Vanguard
I am the President of Construction Inc. → the party
making the foregoing bid.
The bid is not made in the interest of, or on behalf of, any undisclosed erson, partnership, company, association, organization, or corporation. The bid is enuine and not collusive or sham. The bidder has not directly or indirectly induced or solicited any other bidder to put in a false or sham bid. The bidder has not directly or indirectly colluded, conspired, connived, or agreed with any bidder or anyone else to put in a sham bid, or to refrain from bidding. The bidder has not in any manner, directly or indirectly, sought by agreement, communication, or conference with anyone to fix the bid price of the bidder or any other bidder, or to fix any overhead, profit, or cost element of the bid price, or of that of any other bidder. All statements contained in the bid are true.
The bidder has not, directly or indirectly, submitted his or her bid price or any breakdown thereof, or the contents thereof, or divulged information or data relative thereto, to any corporation, partnership, company association, organization, bid depository, or to any member or agent thereof to effectuate a collusive or sham bid, and has not paid, and will not pay, any person or entity for such purpose.
Any person executing this declaration on behalf of a bidder that is a corporation, partnership, joint venture, limited liability company, limited liability partnership, or any other entity, hereby represents that he or she has full power to execute, and does execute, this declaration on behalf of the bidder.
I declare under penalty of perjury under the laws of the State of California that the foregoing is true and correct and that this declaration is executed on 06122/21 [date], Livermore _[city],
California /state].
saut
(Signature)
Billie Sposeto
(Print Name)
President
(Print Title)
00/22120
(Date)
END OF NON-COLLUSION DECLARATION
SECTION 00420
NON-COLLUSION DECLARATION
- 10-
SECTION 00440
LIST OF SUBCONTRACTORS FORM
LIST OF SUBCONTRACTORS FORM
In compliance with the Subletting and Subcontracting Fair Practices Act of the Public Contract Code of the State of California, each bidder shall set forth below: (a) the name, contractor's license number, DIR registration number and the location of the place of business of and (b) the portion of the work which will be done by each subcontractor who will perform work or labor or render service to the Contractor in or about the construction of the work in an amount in excess of one-half of one percent (1/2%) of the Contractor's Total Bid Price. Notwithstanding the foregoing, if the work involves streets and highways, then the Contractor shall list each subcontractor who will perform work or labor or render service to Contractor in or about the work in an amount in excess of one-half of one percent (1/2%) of the Contractor's Total Bid Price or $10,000, whichever is greater. The City may, within its sole discretion, grant additional time to provide the below requested information.
If no subcontractor is specified for a portion of the Work, or if more than one subcontractor is specified for the same portion of Work, to be performed under the Contract in excess of one-half of one percent (1/2%) of the Contractor's Total Bid Price or $10,000, whichever is greater, or if the work involves streets or highways, then the Contractor shall be deemed to have agreed that it is fully qualified to perform that Work, and that it shall perform that portion itself.
CSLB DIR
Portion of Location of
Subcontractor License Registration
Work Business
Number Number
Striping Fineline modesto, (A 1014124 1000039694
striping 95356
Bectrical bear Electrical Alviso, CA 982079 1000002158
Solutions 05002-0924
SECTION 00440
LIST OF SUBCONTRACTORS FORM
- 11-
SECTION 00440
LIST OF SUBCONTRACTORS FORM
Portion of Location of CSLB DIR
Work Subcontractor License Registration
Business Number Number
Name of Bidder FBD Vanguard Construction Inc.
Signature We sued
Name and Title Billie Sposeto, President
-
Dated_ 0l |22|20
END OF LIST OF SUBCONTRACTORS FORM
SECTION 00440
LIST OF SUBCONTRACTORS FORM
- 12-
SECTION 00441
PUBLIC WORKS CONTRACTOR REGISTRATION CERTIFICATION
PUBLIC WORKS CONTRACTOR REGISTRATION CERTIFICATION
Pursuant to Labor Code sections 1725.5 and 1771.1, all contractors and subcontractors that wish to bid on, be listed in a bid proposal, or enter into a contract to perform public work must be registered with the Department of Industrial Relations. See http://www.dir.ca.gov/Public-Works/PublicWorks.html for additional information.
No bid will be accepted nor any contract entered into without proof of the contractor's and subcontractors' current registration with the Department of Industrial Relations to perform public work.
Bidder hereby certifies that it is aware of the registration requirements set forth in Labor Code sections 1725.5 and 1771.1 and is currently registered as a contractor with the Department of Industrial Relations.
Name of Bidder: FBD Vanguard Construction Inc.
DIR Registration Number:_ 1000008493
Bidder further acknowledges:
Bidder shall maintain a current DIR registration for the duration of the project.
2. Bidder shall include the requirements of Labor Code sections 1725.5 and 1771.1 in its contract with subcontractors and ensure that all subcontractors are registered at the time of bid opening and maintain registration status for the duration of the project.
Failure to submit this form or comply with any of the above requirements may result in a finding that the bid is non-responsive.
Signature:
Name and Title: Billie Sposeto, President
Dated: 060/22/20
END PUBLIC WORKS CONTRACTOR REGISTRATION CERTIFICATION
SECTION 00441
PUBLIC WORKS CONTRACTOR REGISTRATION CERTIFICATION
13 FBD VANGUARD CONSTRUCTION, INC.
CERTIFICATE OF SECRETARY
AS TO ELECTION AND AUTHORITY OF OFFICERS
Effective June 1, 2026
Brooke Ashley Welch certifies that:
She port Secretary of FBD Vanguard Construction, In., a Califomia Corporaior
2. The directors of the Corporation have authorized the following resolution in the Action by Written Consent of the Board of Directors of FBD Vanguard Construction, Inc., dated June 1, 2026:
Election of Officers
RESOLVED, that the following persons are elected to the offices as set forth below to serve until the next annual meeting of the Board of Directors, or until their removal, resignation, or death, or until the election and qualification of their successors, whichever shall first occur:
President Billie Sposeto
Chief Executive Officer Dominic Sposeto
Chief Financial Officer Barbara Kathleen Welch
Secretary Brooke Ashley Welch
Therefore, it is RESOLVED that the officers of the Corporation, and each of them, are authorized and directed to execute all documents on behalf of the Corporation.
Dated June 1, 2026. By: Bore wen
Brooke Ashley Welch, Secretary
Home
CONTRACTORS STATE LICENSE BOARD
•Contractor's License Detail for License # 833032
DISCLAIMER: A license status check provides information taken from the CSLB license database. Before relying on this information, you should be aware of the following limitations. • CSLB complaint disclosure is restricted by law ( B&P 7124.6 ) If this entity is subject to public complaint disclosure click on link that will appear below for more information. Click here for a definition of disclosable actions. • Only construction related civil judgments reported to CSLB are disclosed (B&P 7071.17). • Arbitrations are not listed unless the contractor fails to comply with the terms. • Due to workload, there may be relevant information that has not yet been entered into the board's license database.
Data current as of 4/15/2026 1:13:00 PM
Business Information
FB D VANGUARD CONSTRUCTION INC
550 GREENVILLE ROAD
LIVERMORE, CA 94550
Business Phone Number:(925) 245-1300
Entity Corporation
Issue Date 02/25/2004
Expire Date 02/29/2028
License Status
This license is current and active.
All information below should be reviewed.
Classifications
• A - GENERAL ENGINEERING
• B- GENERAL BUILDING
• C-8 - CONCRETE
Bonding Information
Contractor's Bond
This license filed a Contractor's Bond with AMERICAN CONTRACTORS INDEMNITY COMPANY.
Bond Number: 9057757
Bond Amount: $25,000
Effective Date: 01/01/2023
Contractor's Bond History
Bond of Qualifying Individual
The qualifying individual DOMINIC WILLIAM SPOSETO certified that he/she owns 10 percent or more of the voting stock/membership interest of this company; therefore, the Bond of Qualifying Individual is not required.
Effective Date: 03/02/2015
Workers' Compensation
This license has workers compensation insurance with the NATIONAL UNION FIRE INSURANCE COMPANY OF PITTSBURGH, PA Policy Number:38240191
Effective Date: 03/01/2025
Expire Date: 03/01/2027
Workers' Compensation History
Workers' compensation classification code(s):
5205 - Description Unavailable
8810 - Clerical Office Employees
5213 - Concrete Construction
For a description of the workers' compensation classification code(s) listed for this licensee, contact the licensee's insurance carrier.
Contact information for the licensee's insurer is available by clicking the insurer link above. Classification codes are also available on the Workers' Compensation Insurance Rating Bureau's classification search page.
The board does not verify or investigate the accuracy of classification codes displayed.
Back to Top Conditions of Use Privacy Policy Accessibility Accessibility Certification
Copyright © 2026 State of California
State of California
Department of Home Get started Sign up Log in
EST. 1927 Industrial Relations
Home > Customer. Account.Lookup 1000008493 - FBD VANGUARD CONSTRUCTION INC 1000008493 - FBD VANGUARD CONSTRUCTION INC
Customer Account Lookup
PWCR Legal Entity Name
1000008493 FBD VANGUARD CONSTRUCTION INC
Contractor Status Doing Business As (DBA)
DIR Approved FBD VANGUARD CONSTRUCTION INC
CSLB Business Structure
833032 Corporation - S corp
Business Phone President
925 245-1300 Billie Sposeto
Ext Email
[email protected]
Registration Start Date Registration End Date
2025-07-01 2028-06-30
Crafts
Laborer (Construction-Fence Erector-Housemover) (Engineering Construction) Operating Engineer Carpenter and Related Trades Iron Worker Cement Mason Teamster (Work on a construction site)
Address
Mailing Address Physical Address
550 Greenville Rd.
Mailing Address - City Physical Address - City
Livermore
Mailing Address - State Physical Address - State
CA
Mailing Address - Zip Physical Address - Zip
94550
Mailing Address - Country Physical Address - Country
United States
Related Lists
Registration Dates ®
2/2/26, 4:02 PM California Air Resources Board: Off-Road Diesel-Fueled Fleets Regulation California Environmental Protection Agency
Air Resources Board
January 1, 2026
CERTIFICATE OF REPORTED COMPLIANCE
OFF-ROAD DIESEL VEHICLE REGULATION
is issued to
FBD VANGUARD CONSTRUCTION, INC.
This certificate indicates that the fleet listed above has reported off-road diesel vehicles to the California Air Resources Board and has certified they are in compliance with title 13 CCR, section 2449. All applicable vehicles owned by the individual, company, or agency must be reported and labeled, as specified in Section 2449, with all possible completeness, else this certificate is null and void. Certificate expires 2/28/2027 Off-road Diesel Fleet Identification
Michalle Buffington
12582
Michelle Buttington
Chief, Mobile Source Control Division
California Air Resources Board To verify the authenticity of this certificate, enter this number at http://www.arb.ca.gov/doors/compliance_cert1.html
https://ssl.arb.ca.gov/ssldoors/doors_reporting/perm/php/certificate.php 1/2 RESOLUTION NO. 26-38
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF WILLIAMS
AWARDING THE CONSTRUCTION CONTRACT FOR THE HIGHWAY SAFETY
IMPROVEMENT PROGRAM (HSIP) PEDESTRIAN IMPROVEMENTS PROJECT (CITY PROJECT NO. 03-2026, CONTRACT NO. 03-26, HSIP UNIQUE PROJECT ID H11-03-026) TO FBD VANGUARD CONSTRUCTION, INC.
WHEREAS, the City of Williams (“City”) is undertaking the HSIP Pedestrian Improvements Project (“Project”), City Project No. 03-2026, Contract No. 03-26, HSIP Unique Project ID H11- 03-026; and
WHEREAS, the Project consists generally of the construction of pedestrian safety and accessibility improvements at the intersection of 8th Street and F Street, including ADA-compliant curb ramps with detectable warning surfaces, curb, gutter, and sidewalk reconstruction, a solar-powered rectangular rapid flashing beacon, crosswalk and pavement markings, updated signage, and a pavement grind and overlay alternate, together with all appurtenant work; and
WHEREAS, the Project is funded in part through the Highway Safety Improvement Program (HSIP), administered by the California Department of Transportation (Caltrans), a data-driven safety program intended to reduce fatalities and serious injuries on public roadways; and WHEREAS, following City Council adoption May 20, 2026 of the plans, specifications, and working details, and to advertise the Project, the City advertised the Project for competitive public bidding in accordance with Public Contract Code Section 22039; and WHEREAS, sealed bids for the Project were publicly opened and read aloud on June 22, 2026, and three (3) bids were received; and
WHEREAS, FBD Vanguard Construction, Inc. submitted the lowest base bid and is the lowest responsive and responsible bidder for the Project, holding a current and active California Class A, B, and C-8 contractor's license (License No. 833032) and being registered with the California Department of Industrial Relations (DIR Registration No. 1000008493); and WHEREAS, the successful bidder will be required to furnish a Faithful Performance Bond and a Labor and Material Payment Bond, each in an amount equal to 100 percent of the Contract Price; and
WHEREAS, the City Council has reviewed the bid results and the recommendation of staff and desires to award the construction contract for the Project.
NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF WILLIAMS DOES HEREBY RESOLVE AS FOLLOWS:
Section 1. Recitals. The above recitals are true and correct and are incorporated herein by reference.
Section 2. Award of Construction Contract. The City Council hereby awards the construction contract for the HSIP Pedestrian Improvements Project, City Project No. 03-2026, Contract No. 03-26, to FBD Vanguard Construction, Inc., as the lowest responsive and responsible bidder, in the total amount of $258,974.00 (Base Bid of $208,124.00 plus Alternate Bid Item No. 1 of $50,850.00).
Section 3. Authorization to Execute Contract. The City Manager, or designee, is hereby authorized to execute the construction contract and all related documents on behalf of the City, subject to FBD Vanguard Construction, Inc.'s furnishing of the required payment and performance bonds, insurance, and other required Contract Documents.
Section 4. Construction Contingency and Change Orders. The City Council hereby approves a construction contingency in the amount of $25,897.40 (approximately ten percent of the Contract Price) and authorizes the City Manager, or designee, to approve and execute change orders to the construction contract that do not individually or cumulatively exceed the approved contingency amount, in accordance with the City's purchasing policy and applicable law.
Section 5. Further Actions. Staff is directed to take all actions necessary to implement this Resolution and the HSIP Pedestrian Improvements Project.
Section 6. Effective Date. This Resolution shall take effect immediately upon adoption.
PASSED AND ADOPTED by the City Council of the City of Williams at a regular meeting held on the 21st day of October, 2026, by the following vote:
AYES:
NOES:
ABSENT:
ABSTAIN:
_______________________________________
Kate Dunlap, Mayor
ATTEST:
_______________________________________
City Clerk, City of Williams
APPROVED AS TO FORM:
_______________________________________
Andreas Booher, City Attorney
City of Williams DATE: October 21, 2026
City Council ITEM #: 14.
Agenda Report CATEGORY: NEW BUSINESS
SUBJECT: Approve Removal of the Raised Median on E Street Between 9th Street North and 9th Street South and Direct Staff to Revise the E Street Complete Streets Project Plans
BACKGROUND
On August 19, 2026, the City Council adopted Resolution No. 2026-26 awarding City Contract No. 01-26 for construction of the E Street Complete Streets Project (Project) to A. Teichert & Son, Inc. dba Teichert Construction (Teichert) in the amount of $8,894,068.00. The Project is funded primarily with Active Transportation Program (ATP) funds under Program Supplement No. 00000B043 (State Project No. ATPL-5246(014)).
The Project plans include a raised median on E Street between 9th Street North and 9th Street South. The median was included in the design at the recommendation of the previous City Engineer. It was designed to be mountable so that fire apparatus and other emergency vehicles, including those using the fire station on this block, can cross it when needed, and Addendum No. 3 to the bid documents clarified that it will not be landscaped for that reason.
The median has received significant pushback from residents. Much of this discussion occurred outside of formal meetings and was not captured in meeting minutes, so the record on this item is limited. Staff has reviewed the location and has not identified collision history or other safety data establishing a nexus that requires a raised median on this segment. Whether to keep the median is therefore a policy decision for the City Council. Staff has prepared an alternative design that removes the median and is bringing the matter to the Council for a formal decision.
DISCUSSION
The design team has prepared a “No Raised Median Option at 9th Street” exhibit (Attachment A) showing the changes that would be made to the plans. The alternative includes the following:
a. Remove the proposed mountable raised median island segments on E Street in the vicinity of 9th Street.
b. Replace the median with pavement grind and overlay and two-way left turn lane striping. c. Extend the raised pedestrian refuge island at the 9th Street North crosswalk. d. Remove the proposed right turn arrow marking and left turn channelization striping associated with the median design.
Under this option, the pedestrian refuge island at the 9th Street North crosswalk is retained and extended, so the primary pedestrian crossing improvement at this location is preserved. The two-way left turn lane would provide unrestricted turning access for residents, businesses, and emergency vehicles. Because no safety data has been identified that requires the median, either the current design or the alternative is a reasonable option, and the choice rests with the Council.
Because the Project was bid and awarded on the current plans, removing the median would require additional design work and a contract change order with Teichert. The proposed roadway grading would need to be extended across the area where the median was to be built, and the grades checked to confirm that drainage and surface transitions work properly. These changes carry through to multiple plan sheets, including layout, grading, and striping sheets, which would all need to be revised. Deleted median work would be credited and the added grind, overlay, and striping work would be priced through the change order process. The City Manager has existing authority to execute contract change orders for the Project, so no additional authorization is needed for the change order itself. A decision at this meeting would allow the revisions to be made before Teichert begins work in this segment, avoiding potential delay or rework costs.
The ATP grant scope is based on specific Project elements, such as linear footage of sidewalk and bike lanes. Raised medians are not among the elements required under the grant, so removing the median does not affect the approved ATP scope and does not require Caltrans approval. The Council’s action on this item will document the City’s decision and the basis for it as part of the Project record.
Alternatively, the Council may elect to retain the median as designed, in which case no plan revisions or change order would be required and construction would proceed under the current plans.
FISCAL IMPACT
Staff does not expect removal of the median to produce meaningful construction savings. The credit for deleted median work is expected to be largely offset by the cost of the replacement grind and overlay and striping. When combined with other revisions underway on the Project, including storm drain modifications to mitigate conflicts with the E Street water and sewer project, staff does not expect a net change to the construction contract amount. The redesign effort to extend the grading and revise the affected plan sheets will be performed by City Engineering and will require a small adjustment to the Project design budget of approximately $10,000. If the Council elects to retain the median as designed, there is no fiscal impact.
RECOMMENDATION
Staff recommends the City Council, by motion, approve the No Raised Median Option at 9th Street (Attachment A), removing the raised median on E Street between 9th Street North and 9th Street South, and direct staff to revise the E Street Complete Streets Project plans accordingly.
Prepared and Submitted by: Dave Harden, PE, City Engineer Attachments:
Attachment A: No Raised Median Option at 9th Street exhibit (BEN|EN) Ä t t Ä
E ST
9TH ST
9TH ST
8TH ST Ø Ø Ø Ø Ø Ø p p t
City of Williams DATE: October 21, 2026
City Council ITEM #: 15.
Agenda Report CATEGORY: NEW BUSINESS
SUBJECT: Adoption of Plans, Specifications, and Working Details and Award of Construction Contract, and Approval of Optional Construction Management Task – E Street Water and Sewer Improvement Project (City Contract No. 05-26, City Project No. 05-2026)
BACKGROUND
The City of Williams is undertaking the E Street Water and Sewer Improvement Project, City Project No. 05-2026, Contract No. 05-26, to replace aging water and sewer infrastructure within and along E Street. The existing water and sewer mains beneath E Street are in need of replacement, and completion of these underground utility improvements is necessary prior to construction of the planned E Street Complete Streets Project in order to avoid cutting into newly constructed pavement, curb, gutter, and sidewalk.
Staff prepared the plans, specifications, and working details for the Project and advertised the Project for competitive construction bids in accordance with Public Contract Code Section 22039.
Staff is requesting City Council approval and adoption of the plans, specifications, and working details in conjunction with the construction contract award.
The City opened bids for the Project on October 15, 2026, and fourteen (14) bids were received.
Tungsten Engineering Contractors, LLC submitted the lowest responsive base bid. Staff has reviewed the bid results and is bringing this item to the City Council for adoption of the plans, specifications, and working details and award of the construction contract.
DISCUSSION
The E Street Water and Sewer Improvement Project will replace aging water and sewer infrastructure within and along E Street. The project scope includes the following:
Approximately 2,815 linear feet of new PVC water main and appurtenances Approximately 2,140 linear feet of new sanitary sewer main and appurtenances New water services and meter boxes
New fire hydrants
New sewer manholes and cleanouts
Trench excavation and backfill
Pavement removal and resurfacing
Surface restoration within and along E Street
Bid results for City Contract No. 05-26 are summarized below:
Bidder Base Bid
Tungsten Engineering Contractors, LLC $1,472,074
R&R Pacific Construction $1,701,450
SNL Group Inc. $1,824,965
Newland Entities Inc. $1,919,095
Teichert Construction $1,981,100
West Rock Engineering $2,084,425
Marques $2,094,050
Ghilotti Construction $2,208,555
All American Construction Inc. $2,217,205
Vaca Valley Excavating & Trucking $2,284,110
Ranger Pipelines Inc. $2,308,200
ARB, Inc. $2,590,590
Katch Environmental Inc. $2,729,020
North Star Construction $3,674,100
Engineer's Estimate (Base Bid Schedule) $2,500,000
Tungsten Engineering Contractors, LLC submitted the lowest base bid ($1,472,074). The firm holds a current, active CSLB license (No. 1133473; Classification A — General Engineering) and DIR registration (No. 1000677421), and submitted the required bid bond and Non-Collusion Declaration. Staff has determined Tungsten Engineering Contractors, LLC to be the lowest responsive and responsible bidder.
Construction management, inspection, public outreach, and materials testing for the Project will be provided under the City’s existing construction management agreement with Webster Engineering, Inc. (WEI) for the E Street Complete Streets Project, which includes Optional Task 1 – Water and Sewer Improvements. WEI’s original proposal for Optional Task 1 assumed a standalone construction management and public outreach effort of approximately 60 working days in advance of the roadway project, at a fee of $290,500.00. Following negotiations with the City, WEI reduced the Optional Task 1 fee to $122,936.35, a reduction of $167,563.65 (approximately 58 percent).
The negotiated fee assumes the water and sewer improvements will be constructed concurrently with the E Street Complete Streets Project, allowing construction management and inspection staff, public outreach infrastructure (project webpage, outreach hotline, email account, postcard notifications, and weekly coordination meetings), and materials testing resources to be shared between the two projects. Staff recommends approval of Optional Task 1 in an amount not to exceed $122,936.35.
Staff recommends that the City Council approve and adopt the plans, specifications, and working details for the Project and authorize the City Manager to award the construction contract to the lowest responsive and responsible bidder following the period of potential protests. The WEI construction management was previously authorized in the September 16, 2026 Council meeting. and approve Optional Task 1 of the WEI construction management agreement, as set forth in the Recommendation below.
FISCAL IMPACT
The total estimated project cost is $1,742,217.35, covering the construction contract, a construction contingency, and construction engineering/construction management (CE/CM). The total cost will be allocated appropriately to the Water and Sewer Enterprise Funds as broken down below:
Cost Component Amount
Construction Contract $1,472,074
Construction Contingency (10%) $147,207
Construction Engineering / Construction Management (CE/CM) – WEI Optional Task 1
$122,936.35
Total Project Cost $1,742,217.35
The Sewer Enterprise Fund has sufficient cash reserves to fund its portion of the project. The General Fund will provide temporary cash shortfalls of up to $800,000 for the Water Enterprise Fund which will expected to be paid back by the end of Fiscal Year 2028. Staff will monitor construction costs and any change orders against that budget throughout construction.
RECOMMENDATION
Staff recommends the City Council:
1. Approve Resolution 26-39 and adopt the plans, specifications, and working details for the E Street Water and Sewer Improvement Project, City Project No. 05-2026, Contract No. 05-26;
2. Find Tungsten Engineering Contractors, LLC to be the lowest responsive and responsible bidder for City Contract No. 05-26;
3. Award the construction contract to Tungsten Engineering Contractors, LLC in the amount of $1,472,074;
4. Authorize the City Manager to execute the construction contract and related documents, subject to the successful bidder's timely submission of the required performance bond, payment bond, insurance certificates, and executed contract; and following the close or resolution of any protests or the open protest period (5 days from bid opening).
5. Approve a 10% construction contingency ($147,207) for unanticipated changes and contract change orders, for a total construction budget not to exceed $1,619,281.
Prepared and Submitted by: Dave Harden, PE, City Engineer Attachments:
Bid Opening Results, October 15, 2026
Plans, Specifications, and Working Details – E Street Water and Sewer Improvement Project (available on City website
https://cms3.revize.com/revize/williamsCA/ADDENDUM_4_Full%20Specs.pdf?t=202610122030140 or upon request.
Tungsten Engineering Contractors, LLC – Bid Documents
Resolution 26-39
FOUNDED 1814
CITY OF WILLIAMS
E Street Water and Sewer Improvements Project
Bid Opening: Bidder's List & Project Totals
October 15, 2026 @ 2:00pm
Bidding Company / Firm Bid Price
1 Katch Enviromental Inc. 2, 729,020
newland Entities Inc #1, 919,095
R+R Pacific Construction #
3 11, 701,450
RangeR Pipelines Inc. #
4 p, 308,200
5 ARB, INC 2,510,510
Construction #1, 472,074
6 Tungsten Engineering
# 2,284,110
7 Vaca Valley Excavating & trucking
All American Construction Inc. #2.217,205
8 9 West Rock Engineering 2.084,425
North Star Construction #3,l74, 100
11 Teichert Constructim
Ghilotti Constructio #2,208, 555
13 MarQues 8. 094,050
14 Sn/ GRoup Inc. 1,824,965
Opened By:
Dave Harden Attest:
Contracted City Engineer
00 41 43 - BID FORMS
1.1 Bid
Bids will be received at the City of Williams, City Hall, Williams, CA 95987, until 9:00 a.m. on 15 October, 2026
NAME OF BIDDER: Tungsten Engineering Contractors, LLC.
The undersigned hereby declare that we have carefully examined the location of the proposed Work, and have read and examined the Contract Documents, including all plans, specifications, and all addenda, if any for the following Project:
E Street Water and Sewer Improvement Project
We hereby propose to furnish all labor, materials, equipment, tools, transportation, and services, and to discharge all duties and obligations necessary and required to perform and complete the Project, as described and in strict conformity with the Drawings, and these Specifications for TOTAL BID PRICE indicated herein.
The undersigned acknowledges receipt, understanding, and full consideration of the following addenda to the Contract Documents:
Addenda No. 1,2,3,4
1. Attached is the required Bid Guarantee in the amount of not less than 10% of the Total Bid Price.
2. Attached is the completed Designation of Subcontractors form.
3. Attached is the fully executed Noncollusion Declaration form.
4. Attached is the completed Iran Contracting Act Certification form.
5. Attached is the completed Fleet Compliance Certification form.
6. Attached is the completed Public Works Contractor Registration Certification form.
7. Attached is the completed Contractor's Certificate Regarding Workers' Compensation form.
Attached is the completed Bidder Information and Experience form. -17- 00 41 43 - BID FORMS
82276.00000\41949186.1
ADDENDUM 4
A. BID SCHEDULE
UNIT OF EST. UNIT ITEM
NO. ITEM DESCRIPTION MEASURE QTY. PRICE COST
1. Mobilization/Demobilization 1 $124,199.00 $124,199.00 Storm Water Pollution Prevention $10,000.00 $10,000.00
Plan LS 1
Lead Compliance Plan LS 1 $2,500.00 $2,500.00
4. Dewatering 1 $30,000.00 $30,000.00
5. Traffic Control 1 $80,000.00 $80,000.00
Plug/Cap and Abandon Water Pipes EA 16 $2,000.00 $32,000.00 12" Water Main (AWWA C900, DR 18) 1,810 $185.00 $334,850.00 12" Water Main (AWWA C900, DR 14) 220 $185.00 $40,700.00 8" Water Main (AWWA C900, DR 18) 630 $175.00 $110,250.00
10. 8" Water Main (AWWA C900, DR 14) LF 45 $175.00 $7,875.00
11. 6" Water Main (AWWA C900, DR 18) 110 $160.00 $17,600.00
12. Water Service EA 16 $2,500.00 $40,000.00
13. 12" Gate Valves EA 4 $5,000.00 $20,000.00
14. 8" Gate Valves EA 10 $4,000.00 $40,000.00
15. 6" Gate Valves EA 4 $3,500.00 $14,000.00
16. Install Fire Hydrant EA 8 $15,000.00 $120,000.00
17. Remove Fire Hydrant EA 5 $1,500.00 $7,500.00
18. Abandon Water Valves EA 16 $750.00 $12,000.00
19. Plug/Cap and Abandon Sewer Pipes EA 5 $1,000.00 $5,000.00
20. 10" PVC Sewer Main (ASTM D3034, $145.00 $279,850.00 SDR 26) LF 1,930
21. 6" PVC Sewer Main (ASTM D3034, $125.00 $26,250.00
SDR 26) LF 210
22. New 48-inch Manhole EA 5 $7,000.00 $35,000.00
23. Bypass Pumping LS 1 $25,000.00 $25,000.00
24. 4" Lateral Replacement EA 12 $3,000.00 $36,000.00
25. 6" Lateral Replacement EA 1 $3,500.00 $3,500.00
26. Remove Sewer Manhole EA 5 $2,000.00 $10,000.00
27. Abandon Sewer Manhole EA 4 $2,000.00 $8,000.00
The costs for any Work shown or required in the Contract Documents, but not specifically identified as a line item are to be included in the related line items and no additional compensation shall be due to Contractor for the performance of the Work. -18- 00 41 43 - BID FORMS
82276.00000\41949186.1
ADDENDUM 4
In case of discrepancy between the Unit Price and the Item Cost set forth for a unit basis item, the unit price shall prevail and shall be utilized as the basis for determining the lowest responsive, responsible Bidder. However, if the amount set forth as a unit price is ambiguous, unintelligible or uncertain for any cause, or is omitted, or is the same amount as the entry in the "Item Cost" column, then the amount set forth in the "Item Cost" column for the item shall prevail and shall be divided by the estimated quantity for the item and the price thus obtained shall be the Unit Price.
For purposes of evaluating Bids, the City will correct any apparent errors in the extension of unit prices and any apparent errors in the addition of lump sum and extended prices.
The estimated quantities for Unit Price items are for purposes of comparing Bids only and the City makes no representation that the actual quantities of work performed will not vary from the estimates. Final payment shall be determined by the Engineer from measured quantities of work performed based upon the Unit Price.
B. BID ITEM DESCRIPTIONS:
BID ITEM NO. 1. MOBILIZATION/DEMOBILIZATION
MOBILIZATION/DEMOBILIZATION shall conform to the requirements of Greenbook Section 7-
3.4, and these Special Provisions.
The contract price paid per LUMP SUM for MOBILIZATION/DEMOBILIZATION shall include full compensation for furnishing all labor, materials, tools, equipment, and incidentals and for doing all the work involved in MOBILIZATION/DEMOBILIZATION, complete in place, including obtaining all required permits, bonds, and insurance, moving personnel, equipment, supplies, and incidentals to the project site, establishing field offices and storage areas, and removing all equipment and facilities from the site upon completion of the work, as shown on the plans, as specified in Greenbook Section 7-3.4 and these Special Provisions, and as directed by the Engineer.
BID ITEM NO. 2. STORM WATER POLLUTION PREVENTION PLAN (SWPPP) Preparing and implementing the STORM WATER POLLUTION PREVENTION PLAN (SWPPP) shall conform to the provisions in Section 13, "Water Pollution Control," and Section 13-3 "Stormwater Pollution Prevention Plan" of the State Standard Specifications, and Section 7.4.3 "Erosion Control" of the City of Williams Improvement Plans and Specifications, 2025, and these special provisions. STORM WATER POLLUTION PREVENTION PLAN (SWPPP) submittal requirements shall be based on a Risk Level 1. Furthermore, Contractor shall comply with the City of Williams Code Ordinance Chapter 13.05 "Stormwater and Urban Runoff Pollution Control".
The contract LUMP SUM price paid for STORM WATER POLLUTION PREVENTION PLAN (SWPPP) shall include full compensation for furnishing all labor, materials, tools, equipment, and incidentals and for doing all the work involved with preparing and implementing the STORM WATER POLLUTION PREVENTION PLAN (SWPPP), including but not limited to providing a WPC manager, conducting water pollution control training, and monitoring, inspecting and correcting water pollution control practices at the job site, as specified in the State Standard Specifications and these Special Provisions, and as directed by the Engineer.
BID ITEM NO. 3. LEAD COMPLIANCE PLAN
- 19- 00 41 43 - BID FORMS
82276.00000\41949186.1
ADDENDUM 4
Lead Compliance Plan shall conform to the provisions in Section 7-1.02K(6)(i)(ii), "Lead Compliance Plan," of the State Standard Specifications, and these special provisions.
The contract LUMP SUM price paid for LEAD COMPLIANCE PLAN shall include full compensation for furnishing all labor, materials, tools, equipment, and incidentals and for doing all the work involved with implementing the LEAD COMPLIANCE PLAN, as specified in the State Standard Specifications and these special provisions, and as directed by the Engineer.
BID ITEM NO. 4. DEWATERING
DEWATERING shall conform to the requirements of Greenbook Sections 306-5 and 3-12.6.4, and these Special Provisions.
The contract price paid per LUMP SUM for DEWATERING shall include full compensation for furnishing all labor, materials, tools, equipment, and incidentals and for doing all the work involved in DEWATERING, complete in place, including furnishing, installing, operating, maintaining, and removing all pumps, well points, piping, and other equipment necessary to control groundwater and surface water within trenches and excavations, and disposal of the water removed in conformance with applicable permits, as shown on the plans, as specified in Greenbook Sections 306-5 and 3-12.6.4 and these Special Provisions, and as directed by the Engineer BID ITEM NO. 5. TRAFFIC CONTROL
TRAFFIC CONTROL shall conform to the requirements of Greenbook Section 601, and these Special Provisions.
The contract price paid per LUMP SUM for TRAFFIC CONTROL shall include full compensation for furnishing all labor, materials, tools, equipment, and incidentals and for doing all the work involved in TRAFFIC CONTROL, complete in place, including preparing traffic control plans, furnishing, installing, moving, maintaining, and removing all signs, cones, delineators, barricades, flashing arrow signs, and other traffic control devices, and providing flaggers, as necessary to maintain safe traffic control throughout the duration of the work, as shown on the plans, as specified in Greenbook Section 601 and these Special Provisions, and as directed by the Engineer.
BID ITEM NO. 6. PLUG/CAP AND ABANDON WATER PIPES
PLUG/CAP AND ABANDON WATER PIPES shall conform to the requirements of these Special Provisions and the details shown on the Drawings.
The contract price paid per EACH for PLUG/CAP AND ABANDON WATER PIPES shall include full compensation for furnishing all labor, materials, tools, equipment, and incidentals and for doing all the work involved in plugging/capping and abandoning water piping during construction, complete in place, including verification of pipe abandonment by the Owner's staff prior to plugging, removal and proper disposal of any hazardous materials encountered during the abandonment work, plugging each abandoned pipe encountered with no less than one foot of concrete, and all other work necessary to complete the abandonment, as shown on the plans, as specified in these Special Provisions, and as directed by the Engineer.
BID ITEM NO. 7. 12" WATER MAIN (AWWA C900, DR 18)
-20- 00 41 43 - BID FORMS
82276.00000\41949186.1
ADDENDUM 4
12" WATER MAIN (AWWA C900, DR 18), shall conform to the requirements of Greenbook Sections 209-4 and 306-8, AWWA C900, and these Special Provisions.
The contract price paid per LINEAR FOOT for 12" WATER MAIN (AWWA C900, DR 18), shall include full compensation for furnishing all labor, materials, tools, equipment, material testing and incidentals and for doing all the work involved in 12" WATER MAIN (AWWA C900, DR 18), complete in place, including furnishing AWWA C900, DR 18 (Pressure Class 235) PVC pipe, fittings, and jointing materials, excavation, backfill, bedding, trenching, shoring, removal and disposal of excess material, placement and restoration of temporary and permanent paved surfaces, removing obstructions, removing and replacing utilities, connecting to existing water mains, pressure testing, material testing, chlorination and disinfection, and all other work necessary to complete the installation, as shown on the plans, as specified in Greenbook Sections 209-4 and 306-8 and these Special Provisions, and as directed by the Engineer.
BID ITEM NO. 8. 12" WATER MAIN (AWWA C900, DR 14)
12" WATER MAIN (AWWA C900, DR 14), shall conform to the requirements of Greenbook Sections 209-4 and 306-8, AWWA C900, and these Special Provisions.
The contract price paid per LINEAR FOOT for 12" WATER MAIN (AWWA C900, DR 14), shall include full compensation for furnishing all labor, materials, tools, equipment, material testing, and incidentals and for doing all the work involved in 12" WATER MAIN (AWWA C900, DR 14), complete in place, including furnishing AWWA C900, DR 14 (Pressure Class 305) PVC pipe, fittings, and jointing materials, excavation, backfill, bedding, trenching, shoring, removal and disposal of excess material, placement and restoration of temporary and permanent paved surfaces, removing obstructions, removing and replacing utilities, connecting to existing water mains, pressure testing, material testing, chlorination and disinfection, and all other work necessary to complete the installation, as shown on the plans, as specified in Greenbook Sections 209-4 and 306-8 and these Special Provisions, and as directed by the Engineer.
BID ITEM NO. 9. 8" WATER MAIN (AWWA C900, DR 18)
8" WATER MAIN (AWWA C900, DR 18), shall conform to the requirements of Greenbook Sections 209-4 and 306-8, AWWA C900, and these Special Provisions.
The contract price paid per LINEAR FOOT for 8" WATER MAIN (AWWA C900, DR 18), shall include full compensation for furnishing all labor, materials, tools, equipment, material testing, and incidentals and for doing all the work involved in 8" WATER MAIN (AWWA C900, DR 18), complete in place, including furnishing AWWA C900, DR 18 (Pressure Class 235) PVC pipe, fittings, and jointing materials, excavation, backfill, bedding, trenching, shoring, removal and disposal of excess material, placement and restoration of temporary and permanent paved surfaces, removing obstructions, removing and replacing utilities, connecting to existing water mains, pressure testing, material testing, chlorination and disinfection, and all other work necessary to complete the installation, as shown on the plans, as specified in Greenbook Sections 209-4 and 306-8 and these Special Provisions, and as directed by the Engineer.
BID ITEM NO. 10. 8" WATER MAIN (AWWA C900, DR 14)
8" WATER MAIN (AWWA C900, DR 14), shall conform to the requirements of Greenbook Sections 209-4 and 306-8, AWWA C900, and these Special Provisions. -21- 00 41 43 - BID FORMS
82276 00000 419491861
ADDENDUM 4
The contract price paid per LINEAR FOOT for 8" WATER MAIN (AWWA C900, DR 14), shall include full compensation for furnishing all labor, materials, tools, equipment, material testing and incidentals and for doing all the work involved in 8" WATER MAIN (AWWA C900, DR 14), complete in place, including furnishing AWWA C900, DR 14 (Pressure Class 305) PVC pipe, fittings, and jointing materials, excavation, backfill, bedding, trenching, shoring, removal and disposal of excess material, placement and restoration of temporary and permanent paved surfaces, removing obstructions, removing and replacing utilities, connecting to existing water mains, pressure testing, material testing, chlorination and disinfection, and all other work necessary to complete the installation, as shown on the plans, as specified in Greenbook Sections 209-4 and 306-8 and these Special Provisions, and as directed by the Engineer.
BID ITEM NO. 11. 6" WATER MAIN (AWWA C900, DR 18)
6" WATER MAIN (AWWA C900, DR 18), shall conform to the requirements of Greenbook Sections 209-4 and 306-8, AWWA C900, and these Special Provisions.
The contract price paid per LINEAR FOOT for 6" WATER MAIN (AWWA C900, DR 18) shall include full compensation for furnishing all labor, materials, tools, equipment, material testing and incidentals and for doing all the work involved in 6" WATER MAIN (AWWA C900, DR 18), complete in place, including furnishing AWWA C900, DR 18 (Pressure Class 235) PVC pipe, fittings, and jointing materials, excavation, backfill, bedding, trenching, shoring, removal and disposal of excess material, placement and restoration of temporary and permanent paved surfaces, removing obstructions, removing and replacing utilities, connecting to existing water mains, pressure testing, material testing, chlorination and disinfection, and all other work necessary to complete the installation, as shown on the plans, as specified in Greenbook Sections 209-4 and 306-8 and these Special Provisions, and as directed by the Engineer.
BID ITEM NO. 12. WATER SERVICE
WATER SERVICE shall conform to the requirements of Greenbook Section 306-8.8.4, and these Special Provisions.
The contract price paid per EACH for WATER SERVICE, shall include full compensation for furnishing all labor, materials, tools, equipment, and incidentals and for doing all the work involved in WATER SERVICE, complete in place, including furnishing and installing service pipe, saddle, corporation stop, curb stop, fittings and jointing materials, excavation, backfill, bedding, trenching, shoring, tapping the water main, connecting to the customer's existing service, placement and restoration of temporary and permanent paved surfaces, repairing concrete curb, gutter, and sidewalk disturbed by the installation, and all other work necessary to complete the service installation, as shown on the plans, as specified in Greenbook Section 306-8.8.4 and these Special Provisions, and as directed by the Engineer. The City will provide new meters and boxes as needed.
BID ITEM NO. 13. 12" GATE VALVES
12" GATE VALVES shall conform to the requirements of Greenbook Sections 212-5.1 and 306-
8.8, and these Special Provisions.
The contract price paid per EACH for 12" GATE VALVES shall include full compensation for furnishing all labor, materials, tools, equipment, and incidentals and for doing all the work involved in 12" GATE VALVES, complete in place, including furnishing and installing the gate valve, valve -22- 00 41 43 - BID FORMS
82276.00000\41949186.1
ADDENDUM 4
box, valve box cover, and all fittings, excavation, backfill, bedding, trenching, connecting to the water main, testing, and all other work necessary to complete the installation, as shown on the plans, as specified in Greenbook Sections 212-5.1 and 306-8.8 and these Special Provisions, and as directed by the Engineer.
BID ITEM NO. 14. 8" GATE VALVES
8" GATE VALVES shall conform to the requirements of Greenbook Sections 212-5.1 and 306-
8.8, and these Special Provisions.
The contract price paid per EACH for 8" GATE VALVES shall include full compensation for furnishing all labor, materials, tools, equipment, and incidentals and for doing all the work involved in 8" GATE VALVES, complete in place, including furnishing and installing the gate valve, valve box, valve box cover, and all fittings, excavation, backfill, bedding, trenching, connecting to the water main, testing, and all other work necessary to complete the installation, as shown on the plans, as specified in Greenbook Sections 212-5.1 and 306-8.8 and these Special Provisions, and as directed by the Engineer.
BID ITEM NO. 15. 6" GATE VALVES
6" GATE VALVES shall conform to the requirements of Greenbook Sections 212-5.1 and 306-
8.8, and these Special Provisions.
The contract price paid per EACH for 6" GATE VALVES shall include full compensation for furnishing all labor, materials, tools, equipment, and incidentals and for doing all the work involved in 6" GATE VALVES, complete in place, including furnishing and installing the gate valve, valve box, valve box cover, and all fittings, excavation, backfill, bedding, trenching, connecting to the water main or fire hydrant lateral, testing, and all other work necessary to complete the installation, as shown on the plans, as specified in Greenbook Sections 212-5.1 and 306-8.8 and these Special Provisions, and as directed by the Engineer.
BID ITEM NO. 16. INSTALL FIRE HYDRANT
INSTALL FIRE HYDRANT shall conform to the requirements of Greenbook Sections 212-6 and 306-8.8, and these Special Provisions.
The contract price paid per EACH for INSTALL FIRE HYDRANT shall include full compensation for furnishing all labor, materials, tools, equipment, and incidentals and for doing all the work involved in INSTALL FIRE HYDRANT complete in place, including furnishing and installing the fire hydrant, gate valve, hydrant lateral pipe and fittings, any upgraded lateral pipe and fittings, thrust blocking, excavation, backfill, bedding, trenching, connecting to the water main, painting, flushing and testing, placement and restoration of temporary and permanent paved surfaces, repairing concrete curb, gutter, and sidewalk disturbed by the installation, and all other work necessary to complete the installation, as shown on the plans, as specified in Greenbook Sections 212-6 and 306-8.8 and these Special Provisions, and as directed by the Engineer.
BID ITEM NO. 17. REMOVE FIRE HYDRANT
REMOVE FIRE HYDRANT shall conform to the requirements of these Special Provisions and the details shown on the Drawings.
-23- 00 41 43 - BID FORMS
82276.00000\41949186.1
ADDENDUM 4
The contract price paid per EACH for REMOVE FIRE HYDRANT shall include full compensation for furnishing all labor, materials, tools, equipment, and incidentals and for doing all the work involved in removing existing fire hydrants, complete in place, including closing the connecting valve prior to removal, cutting or unbolting the hydrant lateral run and installing a 12-inch concrete plug, removing the hydrant, riser, valve box, and concrete collar, filling the valve riser with concrete to 4 inches below finish grade, resurfacing with 4 inches of asphalt concrete to finish grade (or compacted aggregate base to original grade outside paved areas, repairing concrete curb, gutter, and sidewalk disturbed by the removal, salvaging the removed fire hydrant and delivering it to the City corporation yard, and all other work necessary to complete the removal, as shown on the plans, as specified in these Special Provisions, and as directed by the Engineer.
BID ITEM NO. 18. ABANDON WATER VALVES
ABANDON WATER VALVES, shall conform to the requirements of these Special Provisions and the details shown on the Drawings.
The contract price paid per EACH for ABANDON WATER VALVES, shall include full compensation for furnishing all labor, materials, tools, equipment, and incidentals and for doing all the work involved in abandoning existing gate and blow out valves, complete in place, including closing the valve prior to abandonment, saw cutting and removing the existing valve box, concrete collar, and valve extension, filling the valve riser with concrete to 4 inches below finish grade, resurfacing with 4 inches of asphalt concrete to finish grade, and all other work necessary to complete the abandonment, as shown on the plans, as specified in these Special Provisions, and as directed by the Engineer.
BID ITEM NO. 19. PLUG/CAP AND ABANDON SEWER PIPES
PLUG/CAP AND ABANDON SEWER PIPES shall conform to the requirements of these Special Provisions and the details shown on the Drawings.
The contract price paid per EACH for PLUG/CAP AND ABANDON SEWER PIPES shall include full compensation for furnishing all labor, materials, tools, equipment, and incidentals and for doing all the work involved in plugging/capping and abandoning sewer piping during construction, complete in place, including verification of pipe abandonment by the Owner's staff prior to plugging, plugging each abandoned pipe encountered with no less than one foot of concrete, and all other work necessary to complete the abandonment, as shown on the plans, as specified in these Special Provisions, and as directed by the Engineer.
BID ITEM NO. 20. 10" PVC SEWER MAIN (ASTM D3034, SDR 26) 10" PVC SEWER MAIN (ASTM D3034, SDR 26), shall conform to the requirements of Greenbook Sections 207-17 and 306-7.7, ASTM D3034, and these Special Provisions.
The contract price paid per LINEAR FOOT for 10" PVC SEWER MAIN (ASTM D3034, SDR 26), shall include full compensation for furnishing all labor, materials, tools, equipment, material testing and incidentals and for doing all the work involved in 10" PVC SEWER MAIN (ASTM D3034, SDR 26), complete in place, including furnishing ASTM D3034, SDR 26 pipe, fittings, and jointing materials, excavation, backfill, bedding, trenching, shoring, removal and disposal of excess material, placement and restoration of temporary and permanent paved surfaces, removing obstructions, removing and replacing utilities, connecting to existing manholes, television inspection, material testing, and testing pipelines, and all other work necessary to complete the -24- 00 41 43 - BID FORMS
82276.00000\41949186.1
ADDENDUM 4
installation, as shown on the plans, as specified in Greenbook Sections 207-17 and 306-7.7 and these Special Provisions, and as directed by the Engineer.
BID ITEM NO. 21. 6" PVC SEWER MAIN (ASTM D3034, SDR 26) 6" PVC SEWER MAIN (ASTM D3034, SDR 26), shall conform to the requirements of Greenbook Sections 207-17 and 306-7.7, ASTM D3034, and these Special Provisions.
The contract price paid per LINEAR FOOT for 6" PVC SEWER MAIN (ASTM D3034, SDR 26), shall include full compensation for furnishing all labor, materials, tools, equipment, material testing and incidentals and for doing all the work involved in 6" PVC SEWER MAIN (ASTM D3034, SDR 26), complete in place, including furnishing ASTM D3034, SDR 26 pipe, fittings, and jointing materials, excavation, backfill, bedding, trenching, shoring, removal and disposal of excess material, placement and restoration of temporary and permanent paved surfaces, removing obstructions, removing and replacing utilities, connecting to existing manholes, television inspection, material testing, and testing pipelines, and all other work necessary to complete the installation, as shown on the plans, as specified in Greenbook Sections 207-17 and 306-7.7 and these Special Provisions, and as directed by the Engineer.
BID ITEM NO. 22. NEW 48-INCH MANHOLE
NEW 48-INCH MANHOLE shall conform to the requirements of Greenbook Sections 215 and 306-10, and these Special Provisions.
The contract price paid per EACH for NEW 48-INCH MANHOLE shall include full compensation for furnishing all labor, materials, tools, equipment, and incidentals and for doing all the work involved in NEW 48-INCH MANHOLE, complete in place, including furnishing and installing the 48-inch manhole structure, base, frame and cover, channeling and benching, connecting to existing and proposed sewer mains, excavation, backfill, placement and restoration of temporary and permanent paved surfaces, and all other work necessary to complete the installation, as shown on the plans, as specified in Greenbook Sections 215 and 306-10 and these Special Provisions, and as directed by the Engineer.
BID ITEM NO. 23. BYPASS PUMPING
BYPASS PUMPING shall conform to the requirements of Greenbook Section 3-12.5, and these Special Provisions.
The contract price paid per LUMP SUM for BYPASS PUMPING shall include full compensation for furnishing all labor, materials, tools, equipment, and incidentals and for doing all the work involved in BYPASS PUMPING, complete in place, including furnishing, installing, operating, maintaining, and removing all pumps, piping, and appurtenances necessary to bypass sewer flows around the work area during construction, without causing a spill, backup, or interruption of service to existing customers, as shown on the plans, as specified in Greenbook Section 3-12.5 and these Special Provisions, and as directed by the Engineer.
BID ITEM NO. 24. 4" LATERAL REPLACEMENT
LATERAL REPLACEMENT shall conform to the requirements of Greenbook Sections 207-17 and 306-7.7, and these Special Provisions.
-25- 00 41 43 - BID FORMS
82276.00000\41949186.1
ADDENDUM 4
The contract price paid per EACH for LATERAL REPLACEMENT shall include full compensation for furnishing all labor, materials, tools, equipment, and incidentals and for doing all the work involved in LATERAL REPLACEMENT, complete in place, including furnishing pipe, fittings, and jointing materials, excavation, backfill, bedding, trenching, shoring, cleanouts, connecting to the sewer main and to the existing building lateral, placement and restoration of temporary and permanent paved surfaces, and all other work necessary to complete each lateral replacement, as shown on the plans, as specified in Greenbook Sections 207-17 and 306-7.7 and these Special Provisions, and as directed by the Engineer.
BID ITEM NO. 25. 6" LATERAL REPLACEMENT
LATERAL REPLACEMENT shall conform to the requirements of Greenbook Sections 207-17 and 306-7.7, and these Special Provisions.
The contract price paid per EACH for LATERAL REPLACEMENT shall include full compensation for furnishing all labor, materials, tools, equipment, and incidentals and for doing all the work involved in LATERAL REPLACEMENT, complete in place, including furnishing pipe, fittings, and jointing materials, excavation, backfill, bedding, trenching, shoring, cleanouts, connecting to the sewer main and to the existing building lateral, placement and restoration of temporary and permanent paved surfaces, and all other work necessary to complete each lateral replacement, as shown on the plans, as specified in Greenbook Sections 207-17 and 306-7.7 and these Special Provisions, and as directed by the Engineer.
BID ITEM NO. 26. REMOVE SEWER MANHOLE
REMOVE SEWER MANHOLE, shall conform to the requirements of Greenbook Sections 215 and 306-10, and these Special Provisions.
The contract price paid per EACH for REMOVE SEWER MANHOLE, shall include full compensation for furnishing all labor, materials, tools, equipment, and incidentals and for doing all the work involved in the complete removal of existing sewer manholes, including the base, complete in place, including excavation, breaking out and removing the manhole structure and appurtenances, backfill and compaction of the resulting excavation, disposal of removed materials off-site, and placement and restoration of temporary and permanent paved surfaces, as shown on the plans, as specified in Greenbook Sections 215 and 306-10 and these Special Provisions, and as directed by the Engineer.
BID ITEM NO. 27. ABANDON SEWER MANHOLE
ABANDON SEWER MANHOLE, shall conform to the requirements of Greenbook Sections 215 and 306-10, and these Special Provisions.
The contract price paid per EACH for ABANDON SEWER MANHOLE, shall include full compensation for furnishing all labor, materials, tools, equipment, and incidentals and for doing all the work involved in abandoning existing sewer manholes in place, complete in place, including removing the upper portions of the manhole structure as shown on the plans, backfilling the manhole and remaining structure below per the project specifications, plugging each end of the abandoned sewer main connecting to the manhole, and placement and restoration of temporary and permanent paved surfaces, as shown on the plans, as specified in Greenbook Sections 215 and 306-10 and these Special Provisions, and as directed by the Engineer. -26- 00 41 43 - BID FORMS
82276.00000\41949186.1
ADDENDUM 4
C. TOTAL BID PRICE:
TOTAL BID PRICE BASED ON BID SCHEDULE TOTAL OF UNIT PRICES FOR E Street Water and Sewer Improvement Project
$. $1,472,074.00
Total Bid Price in Numbers
$ One Million Four Hundred Seventy Two Thousand Seventy Four Dollars and Zero Total Bid Price in Written Form
In case of discrepancy between the written price and the numerical price, the written price shall prevail.
The undersigned agrees that this Bid Form constitutes a firm offer to the City which cannot be withdrawn for the number of calendar days indicated in the Notice Inviting Bids from and after the Bid opening, or until a Contract for the Work is fully executed by the City and a third party, whichever is earlier.
The successful bidder hereby agrees to sign the contract and furnish the necessary bonds and certificates of insurance within ten (10) working days after the City provides the successful bidder with the Notice of Award.
Upon receipt of the signed contract and other required documents, the contract will be executed by the City, after which the City will prepare a letter giving Contractor Notice to Proceed. The official starting date shall be the date of the Notice to Proceed, unless otherwise specified. The undersigned agrees to begin the Work within ten (10) working days of the date of the Notice to Proceed, unless otherwise specified.
The undersigned has examined the location of the proposed work and is familiar with the Drawings and Specifications and the local conditions at the place where work is to be done.
If awarded the contract, the undersigned agrees that there shall be paid by the undersigned and by all subcontractors to all laborers, workers and mechanics employed in the execution of such contract no less than the prevailing wage rate within Colusa County for each craft, classification, or type of worker needed to complete the Work contemplated by this contract as established by the Director of the Department of Industrial Relations. A copy of the prevailing rate of per diem wages are on file at the City's Administration Office and shall be made available to interested parties upon request.
Enclosed find cash, bidder's bond, or cashier's or certified check No. from the Bid Bond Bank in the amount of $147,207.40 _ which is not less than ten percent (10%) of this bid, payable to City of Williams as bid security and which is given as a guarantee that the undersigned will enter into a contract and provide the necessary bonds and certificates of insurance if awarded the Work. -27- 00 41 43 - BID FORMS
82276.00000\41949186.1
ADDENDUM 4
The bidder furthermore agrees that in case of bidder's default in executing said contract and furnishing required bonds and certificates of insurance, the cash, bidder's bond, or cashier's or certified check accompanying this proposal and the money payable thereon shall become and shall remain the property of the City of Williams.
Bidder is an individual _, or corporation X, or partnership _ _ organized under the laws of the State of Nevada
Bidder confirms license(s) required by California State Contractor's License Law for the performance of the subject project are in full effect and proper order. The following are the Bidder's applicable license number(s), with their expiration date(s) and class of license(s):
CA License # 1133473, Class A General Engineering, Expires 2/28/27 If the Bidder is a joint venture, each member of the joint venture must include the required licensing information.
Sureties that will furnish the Faithful Performance Bond and the Labor and Material Payment Bond, in the form specified herein, in an amount equal to one hundred percent (100%) of the contract price within ten (10) working days from the date the City provides the successful bidder the Notice of Award. Sureties must meet all of the State of California bonding requirements, as defined in California Code of Civil Procedure Section 995.120 and must be authorized by the State of California.
The insurance company or companies to provide the insurance required in the contract documents must have a Financial Strength Rating of not less than "A-" and a Financial Size Category of not less than "Class VIl" according to the latest Best Key Rating Guide. At the sole discretion of the City, the City may waive the Financial Strength Rating and the Financial Size Category classifications for Workers' Compensation insurance. (signatures continued on next page)
-28- 00 41 43 - BID FORMS
82276.00000 41949186.1
ADDENDUM 4
I hereby certify under penalty of perjury under the laws of the State of California that all of the information submitted in connection with this Bid and all of the representations made herein are true and correct.
Executed at Reno, NV _ on this 15 day of October _, 2026 (Bidders Name - Print or Type)
SERING COL
SEAL Will Hellickson, Vice President, Tungsten Engineering Contractors, LLC. 2018
(Corporate Seal 7 • NEVADA :0
50 COMPANY
Names of individual members! i of firm or names and titles of all officers of corporation and their addresses are listed below:
Name Heather Hellickosn Title President
Complete Address 9408 Double R Blvd, Ste B, Reno, NV 89521 Phone 775-360-6056 FAX
Name Will Hellickson Title Vice President
Complete Address 9408 Double R Blvd, Ste B, Reno, NV 89521 Phone 775-360-6056 FAX
Name Title
Complete Address
Phone FAX
Name Title
Complete Address
Phone _ FAX_
-29- 00 41 43 - BID FORMS
82276.00000\41949186.1
ADDENDUM 4
1.2 Bid Bond
ENote: Not required when other form of Bidder's Security, e.g. cash, certified check or cashier's check, accompanies bid.]
The makers of this bond are, Tungsten Engineering Contractors, LLC - as Principal, and Nationwide Mutual Insurance Company
and are held and firmly bound unto the City of Williams, hereinafter called the City, in the penal sum of TEN PERCENT (10%) OF THE TOTAL BID PRICE of the Principal submitted to City for the work described below, for the payment of which sum in lawful money of the United States, well and truly to be made, we bind ourselves, our heirs, executors, administrators, successors and assigns, jointly and severally, firmly by these presents.
THE CONDITION OF THIS OBLIGATION IS SUCH that whereas the Principal has submitted the accompanying bid dated October 13 _ 20 26, for E Street Water and Sewer Improvement Project.
If the Principal does not withdraw its Bid within the time specified in the Contract Documents; and if the Principal is awarded the Contract and provides all documents to the City as required by the Contract Documents; then this obligation shall be null and void. Otherwise, this bond will remain in full force and effect.
Surety, for value received, hereby stipulates and agrees that no change, extension of time, alteration or addition to the terms of the Contract Documents shall in affect its obligation under this bond, and Surety does hereby waive notice of any such changes.
In the event a lawsuit is brought upon this bond by the City and judgment is recovered, the Surety shall pay all litigation expenses incurred by the City in such suit, including reasonable attorneys' fees, court costs, expert witness fees and expenses.
By their signatures hereunder, Surety and Principal hereby confirm under penalty of perjury that surety is an admitted surety insurer authorized to do business in the State of California.
IN WITNESS WHEREOF, the above-bound parties have executed this instrument under their several seals this 13 day of October , 2026, the name and corporate seal of each corporation.
(Corporate Seal) Tungsten Engineering Contractors, LLC
Contractor/ Principal
Will Wel
By_
Title VIcE PRESIDENt
2018 Nationwide Mutual Insurance Company
(Corporate Seal) : NEVADA. Surety
By Kewd
Attorney-in-Fact
(Attach Attorney-in-Fact Certificate) Title Attorney-in-Fact -30- 00 41 43 - BID FORMS
82276.00000141949186.1
ADDENDUM 1
Notary Acknowledgment
STATE OF EXPORAHA Utah
COUNTY OF Salt Lake
On October 13 - 20_26 _ before me, Stephanie Garahana _ Notary Public, personally Date Name And Tile Of Officer (eg. "Jane Doe, Notary Public) appeared Kevin W. Andrews _ who proved to me on the basis of satisfactory Name(s) of Signers)
evidence to be the person(s) whose names) is/are subscribed to the within instrument and acknowledged to ne that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument.
I certify under PENALTY OF PERJURY under the laws of the State of Salexita that the foregoing paragraph is true and correct.
WITNESS my hand and official seal.
STEPHANIE GARAHANA
NOTARY PUBLIC• STATE OF UTAN
COMMISSION# 746896 stephana arabana
Place Notar Signature of Notary Public
elAbove COMM. EXP. 01-06-2030
OPTIONAL
Though the informat preven fraudent red by and ita pret of titor for er or damn.
CAPACITY CLAIMED BY SIGNER DESCRIPTION OF ATTACHED DOCUMENT • Individual
• Corporate Officer
Title(s) Title or Type of Document
• Partners) Limited
General Number of Pages
• Attorney-In-Fact
• Trustee(s)
• Guardian/Conservator Date of Document
• Other:
Signer is representing:
Name Of Person(s) Or Entity(ies)
Signer(s) Other Than Named Above
NOTE: This acknowledgment is to be completed for Contractor/Principal. -31- 00 41 43 - BID FORMS
82276.00000141949186.1
ADDENDUM 1
Notary Acknowledgment
A notary public or other officer completing this certificate verifies only the identity of the individual who signed the locument to which this certificate is attached, and not thi truthfulness, accuracy, or validity of that document.
STATE OF KALIX@RAYA Nevada
COUNTY OF WASHOE
Оп ОстовЕк 13 _ 2026, before me, _ Name a FEe i am or ray Place) _ Notary Public, personally appeared WILL HELLICKSoN _. who proved to me on the basis of satisfactory Name(s) of Signers)
evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument.
! certify under PENALTY OF PERJURY under the laws of the State of evaday that the foregoing paragraph is true and correct.
NIC FINNEY WITNESS my hand and official seal.
Notary Public, State of Nevada
Appointment No. 26-3944-03
My Appt. Expires Apr 18, 2030
Place Notary Seal Above Signature of Notary Public
OPTIONAL
hough the information below is not required by law, it may prove valuable to persons relying on the documer nd could prevent fraudulent removal and reattachment of this form to another documer
CAPACITY CLAIMED BY SIGNER DESCRIPTION OF ATTACHED DOCUMENT o Individual
• Corporate Officer
Title(s) Title or Type of Document
• Partners) Limited
General Number of Pages
• Attorney-In-Fact
• Trustee(s)
• Guardian/Conservator Date of Document
Signer(s) Other Than Named Above
NOTE: This acknowledgment is to be completed for the Attorney-in-Fact. The Power-of-Attorney to local representatives of the bonding company must also be attached.
END OF BID BOND
-32- 00 41 43 - BID FORMS
82276.00000\41949186.1
ADDENDUM 1
Bond Number:
Power of Attorney
KNOW ALL MEN BY THESE PRESENTS THAT:
Nationwide Mutual Insurance Company, an Ohio corporation hereinafter referred to several iN aNDREWS, LUKE JACKSON, SEAN BADGER, STACIE HANSON, STEPHANIE GALAHANA each in their individual capacity, its true and lawful attorney-in-fact, with full power and authority to sign, seal, and execute on its behalf on the date thereof any and all: (i)bonds and undertakings; (i) Proposal Bonds; (ii) Letters of Surety; (iv) Consent of Surety; and (v) other obligatory instruments of similar nature, in penalties not exceeding the sum of
UNLIMITED
and to bind the Company thereby, as fully and to the same extent as if such instruments were signed by the duly authorized officers of the Company; and all acts of said Attorney pursuant to the authority given are hereby ratified and confirmed.
This power of attorney is made and executed pursuant to and by authority of the following resolution duly adopted by the board of directors of the Company:
RESOLVED, that the president, or any vice president be, and each hereby is, authorized and empowered to appoint attorneys-in-fact of the Company, an to authorize them to execute and deliver on behalf of the Company any and all bonds, forms, applications, memorandums, undertakings, recognizances transfers, contracts of indemnity, policies, contracts guaranteeing the fidelity of persons holding positions of public or private trust, and other writings obligatory in nature that the business of the Company may require; and to modify or revoke, with or without cause, any such appointment or authority; provided, however, that the authority granted hereby shall in no way limit the authority of other duly authorized agents to sign and countersign any of said documents on behalf of the Company."
"RESOLVED FURTHER, that such attorneys-in-fact shall have full power and authority to execute and deliver any and all such documents and to bind the Company subject to the terms and limitations of the power of attorney issued to them, and to affix the seal of the Company thereto; provided, however, This power of attorney is signed and sealed under and by the following bylaws duly adopted by the board of directors of the Company.
Execution of Instruments. Any vice president, any assistant secretary or any assistant treasurer shall have the power and authority to sign or attest all approved documents, instruments, contracts, or other papers in connection with the operation of the business of the company in addition to the chairman of the board, the chief executive officer, president, treasurer or secretary; provided, however, the signature of any of them may be printed, engraved, or stamped on any approved document, contract, instrument, or other papers of the Company.
IN WITNESS WHEREOF, the Company has caused this instrument to be sealed and duly attested by the signature of its officer the 23rd day of October, 2025.
Antonio C. Albanese, Vice President of Nationwide Mutual Insurance Company
ACKNOWLEDGMENT
STATE OF OHIO COUNTY OF FRANKLIN: ss
On this 23rd day of October, 2025, before me came the above-named officer for the Company aforesaid, to me personally known to be the officer described in and who executed the preceding instrument, and he acknowledged the execution of the same, and being by me
SURETY USE ONLY
Karen L. Karn
Notary Public, State of Ohio
No. 2018-RE-719796 Notary Public
My Commission Expires
Commission Expires July 7, 2028 July 7, 2028
CERTIFICATE
1, Lezlie F. Chimienti, Assistant Secretary of the Company, do hereby certify that the foregoing is a full, true and correct copy of the original power of attorney issued by the Company; that the resolution included therein is a true and correct transcript from the minutes of the meetings of the boards of directors and the same has not been revoked or amended in any manner; that said Antonio C. Albanese was on the date of the execution of the foregoing power of attorney the dut elected officer of the Company, and the corporate seal and his signature as officer were duly affixed and subscribed to the said instrument by the authority of said board of directors; and the foregoing power of attorney is still in full force and effect.
IN WITNESS WHEREOF, I have hereunto subscribed my name as Assistant Secretary, and affixed the corporate seal of said Company this 13th day of October 2026
657. 0k.
Assistant Secretary
BDJ 1(10-25)00
1.3 List of Subcontractors
In compliance with the Subletting and Subcontracting Fair Practices Act Chapter 4 (commencing at Section 4100), Part 1, Division 2 of the Public Contract Code of the State of California and any amendments thereof, Bidder shall set forth below: (a) the name and the location of the place of business, (b) the California contractor license number, (c) the DIR public works contractor registration number unless exempt pursuant to Labor Code Sections 1725.5 and 1771.1, and (d) the portion of the work which will be done by each subcontractor who will perform work or labor or render service to the Bidder in or about the construction of the work or improvement to be performed under this Contract in an amount in excess of one-half of one percent (0.5%) of the Bidder's Total Bid Price. Notwithstanding the foregoing, if the work involves the construction of streets and highways, then the Bidder shall list each subcontractor who will perform work or labor or render service to the Bidder in or about the work in an amount in excess of one-half of one percent (0.5%) of the Bidder's Total Bid Price or $10,000, whichever is greater. No additional time shall be granted to provide the below requested information.
If a Bidder fails to specify a subcontractor or if a contractor specifies more than one subcontractor for the same portion of work, then the Bidder shall be deemed to have agreed that it is fully qualified to perform that portion of work and that it shall perform that portion itself.
CSLB DIR
Work to be Name of Location of Contractor Registration
% of
done by Subcontractor Business License No. Number Work
Subcontractor
Pavement Markings, Specialized Pavement 19652 N. Hirsch Ct. #854894 1000886659 1.5% Striping Markings Anderson, CA 96007
530-365-4000
-33- 00 41 43 - BID FORMS
82276.00000\41949186.1
ADDENDUM 4
CSLB DIR
Work to be Name of Location of Contractor Registration % of done by Subcontractor Business License No. Number Work
Subcontractor
(Attach additional sheets if necessary)
Name of Bidder Tungsten Engineering Contractors, LLC
signature WIl TAk
Name and Title Will Hellickson, Vice President
Dated October 15, 2026
-34- 00 41 43 - BID FORMS
82276.00000\41949186.1
ADDENDUM 4
1.4 Bidder Information and Experience Form
ARTICLE 1. INFORMATION ABOUT BIDDER
(Indicate not applicable ("N/A") where appropriate.)
NOTE: Where Bidder is a joint venture, pages shall be duplicated and information provided for all parties to the joint venture.
1.0 Name of Bidder: Tungsten Engineering Contractors, LLC.
2.0 Type, if Entity: Limited Liability Corporation
3.0 Bidder Address: 9408 Double R Blvd, Ste B, Reno, NV 89521 775-360-6056
Facsimile Number Telephone Number
[email protected]
Email Address
4.0 How many years has Bidder's organization been in business as a Contractor? 8 years
5.0 How many years has Bidder's organization been in business under its present name? 8 years
5.1 Under what other or former names has Bidder's organization operated?_
6.0 If Bidder's organization is a corporation, answer the following:
6.1 Date of Incorporation: 2/1/2018
6.2 State of Incorporation: Nevada
6.3 President's Name: Heather Hellickson
6.4 Vice-President's Name(s): Will Hellickson
6.5 Secretary's Name:
6.6 Treasurer's Name:
-35- 00 41 43 - BID FORMS
82276.00000141949186.1
ADDENDUM 4
7.0 If an individual or a partnership, answer the following:
7.1 Date of Organization:
7.2 Name and address of all partners (state whether general or limited partnership):
8.0 If other than a corporation or partnership, describe organization and name principals:
9.0 List other states in which Bidder's organization is legally qualified to do business.
Nevada
California
10.0 What type of work does the Bidder normally perform with its own forces? Heavy Civil Construction, Underground, Grading, Paving, Concrete, Sewer, Water
11.0 Has Bidder ever failed to complete any work awarded to it? If so, note when, where, and why:
No
12.0 Within the last five years, has any officer or partner of Bidder's organization ever been an officer or partner of another organization when it failed to complete a contract? If so, attach a separate sheet of explanation:
No
-36- 00 41 43 - BID FORMS
82276.00000\41949186.1
ADDENDUM 4
13.0 List Trade References:
Jeff Bean, Q&D Construction
Richard Buenting, Road and Highway Builders, LLC.
Matt Franz, DeSilva Gates Construction
Weston Hutchings, Hat Creek Construction
14.0 List Bank References (Bank and Branch Address):
Western Alliance Bank
5335 Kietzke Lane Reno, NV 89511
15.0 Name of Bonding Company and Name and Address of Agent:
Nationwide Mutual Insurance Company
Kevin Andrews, Trucordia, 9980 South 300, West #120, Sandy, UT, 84070 801-984-6042
[REMAINDER OF THIS PAGE INTENTIONALLY LEFT BLANK]
-37- 00 41 43 - BID FORMS
82276.00000\41949186.1
ADDENDUM 4
ARTICLE 2. LIST OF CURRENT PROJECTS (BACKLOG)
[**Duplicate Page if needed for listing additional current projects.**] Project Description of Completion Date Cost of Bidder's Bidder's Work Work
Caltrans 03-3H6104 Underground 12/15/2026 $4mil
Town of Truckee Underground 10/31/2026 $1.5mil
-38- 00 41 43 - BID FORMS
82276.00000\41949186.1
ADDENDUM 4
ARTICLE 3. LIST OF COMPLETED PROJECTS - LAST THREE YEARS [**Duplicate Page if needed for listing additional completed projects.**] Please include only those projects which are similar enough to demonstrate Bidder's ability to perform the required Work.
Project Description of Completion Date Cost of Bidder's Bidder's Work Work
Caltrans 03-0J5204 Storm Drain 10/1/2026 $300,000.00
Caltrans 03-1H1404 Storm Drain, Water 9/15/2026 $3,000,000.00 RTIA - Central Utility Water Line 4/1/2026 $1,200,000.00 RTIA - East Apron Storm Drain 12/15/2025 $1,200.000.00
RTIA - South RON Storm Drain, Water 11/15/2025 $1,074,074.00 Caltrans 02-1J75U4 Storm Drain 9/15/2026 $900,000.00
Hwy 50 Pioneer Trail Storm Drain 9/1/2025 $696,074.00
-39- 00 41 43 - BID FORMS
82276.00000\41949186.1
ADDENDUM 4
ARTICLE 4. EXPERIENCE AND TECHNICAL QUALIFICATIONS QUESTIONNAIRE Personnel:
The Bidder shall identify the key personnel to be assigned to this project in a management, construction supervision or engineering capacity.
1. List each person's job title, name and percent of time to be allocated to this project:
Scot Armstrong - Project Manager - 100%
Dory Karcher - Superintendent -100%
Curtis Armstrong - Foreman - 100%
2. Summarize each person's specialized education:
Scot Armstrong - High School, Operating Engineers
Dory Karcher - High School, Operating Engineers
Curtis Armstrong - High School, Operating Engineers
3. List each person's years of construction experience relevant to the project:
Scot Armstrong - 10+ years
Dory Karcher - 10+ years
Curtis Armstrong - 10+ years
4. Summarize such experience:
Scot Armstrong - Experienced in Public Works Heavy Civil Construction Dory Karcher - Experienced Supervisor of underground water, sewer, and storm drain Curtis Armstrong - Experienced Supervisor of underground water, sewer, and storm drain Bidder agrees that personnel named in this Bid will remain on this Project until completion of all relevant Work, unless substituted by personnel of equivalent experience and qualifications approved in advance by the City.
Additional Bidder's Statements:
If the Bidder feels that there is additional information which has not been included in the questionnaire above, and which would contribute to the qualification review, it may add that information in a statement here or on an attached sheet, appropriately marked:
-40- 00 41 43 - BID FORMS
82276.00000\41949186.1
ADDENDUM 4
ARTICLE 5. VERIFICATION AND EXECUTION
These Bid Forms shall be executed only by a duly authorized official of the Bidder:
1 declare under penalty of perjury under the laws of the State of California that the foregoing information is true and correct:
Name of Bidder Tungsten Engineering Contractors, LLC
wall shak
Signature-
Name Will Hellickson
Title Vice President
Date 10/15/2026
-41- 00 41 43 - BID FORMS
82276.00000\41949186.1
ADDENDUM 4
1.5 Non-Collusion Declaration
The undersigned declares:
I am the Vice President of Tungsten Engineering Contractors, LLC. _ the party making the foregoing Bid.
The Bid is not made in the interest of, or on behalf of, any undisclosed person, partnership, company, association, organization, or corporation. The Bid is genuine and not collusive or sham.
The Bidder has not directly or indirectly induced or solicited any other Bidder to put in a false or sham bid. The Bidder has not directly or indirectly colluded, conspired, connived, or agreed with any Bidder or anyone else to put in a sham bid, or to refrain from bidding. The Bidder has not in any manner, directly or indirectly, sought by agreement, communication, or conference with anyone to fix the Bid Price of the Bidder or any other Bidder, or to fix any overhead, profit, or cost element of the Bid Price, or of that of any other Bidder. All statements contained in the Bid are true. The Bidder has not, directly or indirectly, submitted his or her Bid Price or any breakdown thereof, or the contents thereof, or divulged information or data relative thereto, to any corporation, partnership, company, association, organization, bid depository, or to any member or agent thereof to effectuate a collusive or sham bid, and has not paid, and will not pay, any person or entity for such purpose.
Any person executing this declaration on behalf of a Bidder that is a corporation, partnership, joint venture, limited liability company, limited liability partnership, or any other entity, hereby represents that he or she has full power to execute, and does execute, this declaration on behalf of the Bidder.
I declare under penalty of perjury under the laws of the State of California that the foregoing is true and correct and that this declaration is executed on 10/15/26 [date], at Reno _ [cityl, Nevada [state].
Name of Bidder Tungsten Engineering Contractors, LLC.
Wall fo
Signature_
Name Will Hellickson
-
Title Vice President
-
-42- 00 41 43 - BID FORMS
82276.00000\41949186.1
ADDENDUM 4
Iran Contracting Act Certification.
(Public Contract Code section 2200 et seq.)
As required by California Public Contract Code Section 2204, the Contractor certifies subject to penalty for perjury that the option checked below relating to the Contractor's status in regard to the Iran Contracting Act of 2010 (Public Contract Code Section 2200 et seq.) is true and correct:
• The Contractor is not:
(1) identified on the current list of person and entities engaged in investment activities in Iran prepared by the California Department of General Services in accordance with subdivision (b) of Public Contract Code Section 2203; or 2) a financial instruction that extends, for 45 days or more, credit in the amount of $20,000,000 or more to any other person or entity identified on the current list of persons and entities engaging in investment activities in Iran prepared by the California Department of General Services in accordance with subdivision (b) of Public Contract Code Section 2203, if that person or entity uses or will use the credit to provide goods or services in the energy sector in Iran.
The City has exempted the Contractor from the requirements of the Iran Contracting Act of 2010 after making a public finding that, absent the exemption, the City will be unable to obtain the goods and/or services to be provided pursuant to the Contract.
The amount of the Contract payable to the Contractor for the Project does not exceed $1,000,000
Signature:
Printed Name: Will Hellickson
Title: Vice President
Firm Name: Tungsten Engineering Contractors, LLC.
Date: 10/15/2026
-
Note: In accordance with Public Contract Code Section 2205, false certification of this form shall be reported to the California Attorney General and may result in civil penalties equal to the greater of $250.000 or twice the Contract amount, termination of the Contract and/or ineligibility to bid on contracts for three years.
<Month> <Year> -43- 00 41 43 - BID FORMS
Pipeline Project XXXX
82276.00000 41949186.1
ADDENDUM 4
1.7 Public Works Contractor Registration Certification
Pursuant to Labor Code sections 1725.5 and 1771.1, all contractors and subcontractors that wish to bid on, be listed in a bid proposal, or enter into a contract to perform public work must be registered with the Department of Industrial Relations. See http://www.dir.ca.gov/Public- Works/PublicWorks.html for additional information.
No bid will be accepted nor any contract entered into without proof of the contractor's and subcontractors' current registration with the Department of Industrial Relations to perform public Bidder hereby certifies that it is aware of the registration requirements set forth in Labor Code sections 1725.5 and 1771.1 and is currently registered as a contractor with the Department of Industrial Relations.'
Name of Bidder: Tungsten Engineering Contractors, LLC
DIR Registration Number: 1000677421
DIR Registration Expiration: 2029-06-30
Small Project Exemption: _ Yes or x No
Unless Bidder is exempt pursuant to the small project exemption, Bidder further acknowledges:
1. Bidder shall maintain a current DIR registration for the duration of the project.
2. Bidder shall include the requirements of Labor Code sections 1725.5 and 1771.1 in its contract with subcontractors and ensure that all subcontractors are registered at the time of bid opening and maintain registration status for the duration of the project.
3. Failure to submit this form or comply with any of the above requirements may result in a finding that the bid is non-responsive.
Name of Bidder Tungsten Engineering Contractors, LLC.
all buk
Signature -
Name and Title Will Hellickson, Vice President
Dated 10/15/2026
f the Project is exempt from the contractor registration requirements pursuant to the small project exemption under Labor Coc ections 1725.5 and 1771.1, please mark "Yes" in response to "Small Project Exemptior <Month> < Year> 00 41 43 - BID FORMS
Pipeline Project XXXX
82276.00000\41949186.1
ADDENDUM 4
1.8 Contractor's Certificate Regarding Workers' Compensation I am aware of the provisions of section 3700 of the Labor Code which require every employer to be insured against liability for workers compensation or to undertake self-insurance in accordance with the provisions of that code, and I will comply with such provisions before commencing the performance of the work of this Contract.
Name of Bidder Tungsten Engineering Contractors, LLC
Signature
Name Will Hellickson
Title Vice President
Dated October 15, 2026
<Month> <Year> -45- 00 41 43 - BID FORMS
Pipeline Project XXXX
82276 00000\41949186.1
ADDENDUM 4
1.9 Fleet Compliance Certification.
Bidder hereby acknowledges that they have reviewed the California Air Resources Board's policies, rules and regulations and are familiar with the requirements of Title 13, California Code of Regulations, Division 3, Chapter 9, effective on January 1, 2024 (the "Regulation"). Bidder hereby certifies, subject to penalty for perjury, that the option checked below relating to the Bidder's fleet, and/or that of their subcontractors) ("Fleet") is true and correct:
The Fleet is subject to the requirements of the Regulation, and the appropriate Certificates) of Reported Compliance have been attached hereto.
The Fleet is exempt from the Regulation under section 2449.1(f)(2), and a signed description of the subject vehicles, and reasoning for exemption has been attached hereto.
Bidder and/or their subcontractor is unable to procure R99 or R100 renewable diesel fuel as defined in the Regulation pursuant to section 2449.1(f)(3). Bidder shall keep detailed records describing the normal refueling methods, their attempts to procure renewable diesel fuel and proof that shows they were not able to procure renewable diesel (i.e. third party correspondence or vendor bids).
The Fleet is exempt from the requirements of the Regulation pursuant to section 2449(i)(4) because this Project has been deemed an Emergency, as defined under section 2449(c)(18). Bidder shall only operate the exempted vehicles in the emergency situation and records of the exempted vehicles must be maintained, pursuant to section 2449(i)(4).
The Fleet does not fall under the Regulation or are otherwise exempted and a detailed reasoning is attached hereto.
Name of Bidder: Tungsten Engineering Contractors, LLC.
Signature:
Name: Will Hellickson
Title: Vice President
Date: 10/15/2026
<Month> <Year= -46- 00 41 43 - BID FORMS
Pipeline Project XXXX
82276.00000\41949186.1
ADDENDUM 4
RESOLUTION NO. 26-39
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF WILLIAMS
APPROVING THE PLANS, SPECIFICATIONS, AND WORKING DETAILS AND
AWARDING THE CONSTRUCTION CONTRACT, AUTHORIZING A
CONSTRUCTION CONTINGENCY, AND APPROVING AN OPTIONAL
CONSTRUCTION MANAGEMENT TASK FOR THE E STREET WATER AND SEWER IMPROVEMENT PROJECT (CITY PROJECT NO. 05-2026, CONTRACT NO. 05-26)
WHEREAS, the City of Williams (“City”) is undertaking the E Street Water and Sewer Improvement Project (“Project”), City Project No. 05-2026, Contract No. 05-26; and WHEREAS, the Project consists generally of the installation of approximately 2,815 linear feet of new PVC water main and appurtenances and approximately 2,140 linear feet of new sanitary sewer main and appurtenances, together with new water services, fire hydrants, sewer manholes and cleanouts, trench excavation and backfill, pavement removal and resurfacing, and surface restoration, all within and along E Street; and
WHEREAS, the water and sewer mains beneath E Street are in need of replacement, and completion of the underground utility improvements is necessary prior to construction of the E Street Complete Streets Project to avoid cutting into newly constructed pavement, curb, gutter, and sidewalk; and
WHEREAS, the City has prepared plans, specifications, and working details for the Project and has advertised the Project for competitive public bidding; and WHEREAS, the City issued a Notice Inviting Bids for the Project, with sealed bids due on October 15, 2026, at 2:00 p.m.; and
WHEREAS, the Project requires a Class A General Engineering Contractor license, and all contractors and subcontractors performing work on the Project are required to comply with applicable California Department of Industrial Relations registration and prevailing wage requirements; and
WHEREAS, the successful bidder will be required to furnish a Faithful Performance Bond and a Labor and Material Payment Bond, each in an amount equal to 100 percent of the Contract Price; and
WHEREAS, following the receipt and evaluation of bids, the City Council desires to approve the plans, specifications, and working details for the Project and award the construction contract to Tungsten Engineering Contractors, LLC in the amount of $1,472,074; and WHEREAS, to address unforeseen conditions and changes in the Work that may arise during construction, staff recommends that the City Council authorize a construction contingency equal to ten percent (10%) of the construction contract amount, for a total construction authorization not to exceed one hundred ten percent (110%) of the construction contract amount; and WHEREAS, the City has an existing agreement with Webster Engineering, Inc. (“WEI”) dated September 24, 2026 for construction management services for the E Street Complete Streets Project (“CM Agreement”), which includes Optional Task 1 – Water and Sewer Improvements for construction management, inspection, public outreach, and materials testing services for the Project, to be authorized at the City’s discretion; and WHEREAS, following negotiations with the City, WEI reduced its proposed fee for Optional Task 1 to $122,936.35, based on construction of the Project concurrently with the E Street Complete Streets Project, which allows construction management, inspection, public outreach, and materials testing resources to be shared between the two projects; and WHEREAS, staff recommends that the City Council approve Optional Task 1 – Water and Sewer Improvements of the CM Agreement, in an amount not to exceed $122,936.35, to provide construction management, inspection, and contract administration services for the Project.
NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF WILLIAMS DOES HEREBY RESOLVE AS FOLLOWS:
Section 1. Recitals. The above recitals are true and correct and are incorporated herein by reference.
Section 2. Approval of Plans, Specifications, and Working Details. The City Council hereby approves and adopts the plans, specifications, and working details for the E Street Water and Sewer Improvement Project, City Project No. 05-2026, Contract No. 05-26.
Section 3. Bid Evaluation and Determination. The City Council has reviewed the bids received for the Project and determines that Tungsten Engineering Contractors, LLC is the lowest responsive and responsible bidder, with a bid of $1,472,074.
Section 4. Award of Construction Contract. The City Council hereby gives the authority to the City Manager to award the construction contract for the E Street Water and Sewer Improvement Project, City Project No. 05-2026, Contract No. 05-26, to Tungsten Engineering Contractors, LLC in the amount of $1,472,074 following the completion of the bid protest period, and authorizes the City Manager, or designee, to execute the contract and necessary related documents on behalf of the City, subject to receipt and approval of all required bonds, insurance, and contract documents.
Section 5. Construction Contingency. The City Council hereby approves a construction contingency in the amount of $147,207, equal to ten percent (10%) of the construction contract amount, for a total construction authorization not to exceed $1,619,281, or one hundred ten percent (110%) of the construction contract amount. The City Manager, or designee, is authorized to approve and execute contract change orders for the Project, provided that the cumulative total of all change orders does not exceed the approved construction contingency.
Section 6. Approval of Optional Construction Management Task. The City Council hereby approves Optional Task 1 – Water and Sewer Improvements of the CM Agreement with WEI for construction management and inspection services for the Project, in an amount not to exceed $122,936.35, and authorizes the City Manager, or designee, to issue written authorization to proceed with the optional task and to execute any related documents on behalf of the City.
Section 7. Further Actions. Staff is directed to take all actions necessary to implement this Resolution and the E Street Water and Sewer Improvement Project.
Section 8. Effective Date. This Resolution shall take effect immediately upon adoption.
PASSED AND ADOPTED by the City Council of the City of Williams at a regular meeting held on the 21st day of October, 2026, by the following vote:
AYES:
NOES:
ABSENT:
ABSTAIN:
_______________________________________
Kate Dunlap, Mayor
ATTEST:
_______________________________________
City Clerk, City of Williams
APPROVED AS TO FORM:
_______________________________________
Andreas Booher, City Attorney
City of Williams DATE: October 21, 2026
City Council ITEM: 16.
Agenda Report CATEGORY: New Business
SUBJECT
City of Williams Review and Update of the Business License and Building User Fees
SUMMARY
The proposed update to the City of Williams Business License and Building User Fee Schedule provides an annual inflationary adjustment to the fees previously established through the City's comprehensive fee study. Applying the SFOH CPI-U provides a consistent methodology for maintaining the fee schedule as the cost of providing municipal services changes.
BACKGROUND
The City of Williams completed a comprehensive Business License and Building User Fee Study in 2025 to evaluate the City's existing fees and ensure that fees appropriately reflect the costs associated with providing related services. Following completion of the study, the City Council adopted an updated fee schedule based on the findings and recommendations of the comprehensive review. While the intent of the fee study was to provide for ongoing adjustments to account for changes in the cost of providing municipal services, the resolution adopting the 2025 fee schedule did not include a provision authorizing an annual adjustment based on the Consumer Price Index (CPI). The purpose of this resolution is to correct that omission by formally incorporating the annual CPI adjustment into the City's fee schedule and updating the fees accordingly.
DISCUSSION
This report presents the draft updated City of Williams Business License and Building User Fee Schedule for City Council review and consideration.
As part of the annual update, staff has adjusted the fees previously approved through the comprehensive study using the San Francisco-Oakland-Hayward Consumer Price Index for All Urban Consumers (SFOH CPI-U). The use of the CPI-U provides a consistent and objective method for accounting for inflation and changes in the cost of goods, services, labor, and other resources necessary to administer the City's business licensing and building-related services.
The proposed update is intended to maintain the relative cost recovery established through the comprehensive fee study while avoiding the need for a full fee study each year. The adjustment is an annual inflationary update to the previously approved fees rather than a comprehensive restructuring of the City's fee program.
Staff has reviewed the updated calculations and incorporated the applicable CPI-U adjustment into the proposed fee schedule. The updated schedule is provided to the City Council for review and consideration.
There was one change to the Building Fee Schedule. Rather than charging a fee for each reinspection occurrence, BPR suggested that the City collect a $2,500 deposit. Each reinspection occurrence would then be deducted from the deposit as the inspections are performed. This approach would allow the City to collect the anticipated inspection costs upfront while avoiding the need to process a separate payment for each occurrence.
A letter from Ben Jackson of BPR explaining the proposed deposit approach is attached for reference.
FISCAL IMPACT
The proposed fee adjustments are intended to help the City maintain appropriate cost recovery for services associated with business licensing and building-related activities. Adjusting fees based on the applicable CPI-U helps account for increases in the City's costs of providing these services.
The actual fiscal impact will depend on the number and type of business licenses, permits, and other services for which fees are collected during the fiscal year.
RECOMMENDATION
Staff recommends that the City Council review the proposed updated fee schedule and approve the annual adjustment.
Prepared and Submitted by: Katheryn Ramsaur - City Planner Attachment:
A. Resolution No. 2026-40 A Resolution of the City Council Adopting the Building and Business License User Fees Update for the City of Williams
B. BPR’s deposit suggestion letter
RESOLUTION 26-40
A RESOLUTION OF THE CITY COUNCIL ADOPTING CPI AJDUSTMENTS AND
PASSTHROUGH FEE UPDATES TO THE
BUILDING AND BUSINESS LICENSE USER FEES
FOR THE CITY OF WILLIAMS
WHEREAS, the City Council by resolution No. 25-15 has adopted certain fees and charges applicable to Business License Tax Rate; and
WHEREAS, the Williams Municipal Code and other applicable authority authorizes the City Council to charge fees to reimburse its costs for building services; and WHEREAS, city staff has undertaken an extensive review of such fees presently utilized by the City and determined there are resultant changes necessary; and,
WHEREAS, notice was given before the public for the October 21, 2026 Council Meeting where the fee schedule adjusted according to the San Francisco Oakland Hayward Consumer Price Index for All Urban Consumersfor Calander year 2025wasintroduced, and a properly noticed Public Hearing was held on October 21, 2026 before the City Council of the City of Williams; and, WHEREAS, the City Council and the citizens of the City of Williams have had the opportunity to review and provide input on these proposed fees; and,
WHEREAS, such input has been considered and incorporated where necessary; SECTION 1. NOW, THEREFORE, be it resolved that the City Council of the City of Williams adopts this resolution effective the day set forth below and declares as follows:
1. The City’s Building and Business License User Fees as adopted by Resolution No. 25-15 are superseded by this resolution.
2. Effective immediately, the City’s Building Permit Fee shall be charged as follows:
Description Unit Current
Fee
CPI adjusted Fee
FY 2026-27
New Building Fees:
Work conducted without a permit per
occurrence
$319.32 $324.11
Permit Revision per
occurrence
$108.85 $110.48
Renewal of Expired permit/Extension per
occurrence
$56.22 $57.06
Temporary Certificate of Occupancy per
occurrence
$108.85 $110.48
Inspections outside of business hours
(min. 1 hr. charge)
per hour $108.85 $110.48
Re-Inspection Fees (min. 1 hr. charge) per hour $108.85 $110.48 Missed inspection fee per
occurrence
$108.85 $110.48
Pre permit inspection - without follow
up report
per
occurrence
$108.85 $110.48
Pre permit inspection - with follow up
report
per
occurrence
$214.08 $217.29
Inspection for which no fee is
specifically indicated (min. 1 hr.)
per hour $108.85 $110.48
Research of Files (min. 1 hr.) per hour $108.85 $110.48 Demolition residential per
occurrence
$214.08 $217.29
Demolition Commercial per
occurrence
$214.08 $217.29
Permit Processing application $108.85 $110.48
3. Effective immediately, the City’s Business License User Fee shall be charged as follows:
Description Unit Fee CPI adjusted Fee
FY 2026-27
Business License Fees:
Application application $88.29 $89.61
Home Occupation annually $183.17 $185.92
Classification "C" - Flat Fee annually $88.29 $89.61
New Business License Fees:
New Business with Inspection at
application
$250.80 $254.56
Operating without a Business License
(revoked/no apply)
at resolution $257.64 $261.50
Carnival Circus per day $166.22 $168.71
Peddler/Solicitor annually $157.73 $160.10
SECTION 2. Automatic Annual Inflation Adjustment.
Beginning on July 1, 2027, and on July 1 of each subsequent calendar year thereafter, the user fees established by this Resolution shall be automatically adjusted to reflect the change in the Consumer Price Index (CPI) as described:.
The annual adjustment shall be calculated using the percentage change in the San Francisco Oakland Hayward Consumer Price Index for All Urban Consumers (SFOH CPI-U) published by the U.S. Department of Labor, Bureau of Labor Statistics.
The calculation shall use the 12-month percentage change from the most recent June index compared to the index from June of the prior year. In no event shall an adjustment cause a fee to decrease below its currently adopted rate, nor shall any fee exceed the reasonable cost of providing the service.
SECTION 3. Pass Through Fees and Costs
When the review, evaluation or approval of an application requires specialized expertise beyond that provided by city’s staffing resources, it is important that the City recovers cost associated with reviews by third-party professionals. Such costs may include, but are not limited to, specialized services provided by engineering, legal, planning, environmental, and other consulting professionals. The applicant shall reimburse the City for the actual costs of all third-party services incurred in connection with the application.
The City may require an advance deposit to cover anticipated pass-through costs, with any unused balance refunded and any additional costs billed to the Applicant/Developer.
Passed and adopted this 21st day of October by the following vote:
AYES:
NOES:
ABSENT:
ABSTAIN:
ATTEST: APPROVED AS TO FORM:
__________________________________
CITY CLERK, MARIANA PINEDA ________________________________
MAYOR, KATE DUNLAP
Additional building inspection services
The City of Williams has contracted with BPR Consulting group for their building inspection services. Inspection services are only provided on Mondays. Due to construction timelines this may not be feasible for all projects.
If a project requires more frequent inspections than once a week on a Monday, the process for requesting additional inspections is outlined below. • A deposit of $2500 will be submitted to the City of Williams for these additional inspections.
• The inspection request will be requested at least 48hrs prior to inspection. • Requests will include inspection type applicable to construction phase. • Requests will be via email to [email protected] and [email protected]
• Upon reviewing the request confirmation will be provided. • The fee for each inspection will be billed at $115/hr for inspection time and travel time round trip from the BPR office in Roseville.
• Mileage at the current federal rate will be billed for the travel to and from the inspection.
• Upon reaching $500 remaining in the account an update will be sent and the option to renew the deposit will be available.
• Upon completion of the project any remaining deposit balance will be refunded.
Please provide a check for this deposit to the City of Williams if inspections will be requested in this manner.
If there are any further questions please contact the City of Williams Building Department City of Williams DATE: October 21, 2026
City Council ITEM: 17.
Agenda Report CATEGORY: New Business
SUBJECT: Authorize the Purchase of Two Public Works Vehicles for the Water and Sewer Enterprise Funds
BACKGROUND
The Water Department’s 2010 Ford F-450 has approximately 71,934 miles and has experienced multiple mechanical issues. A failed powertrain control module (PCM) kept the truck out of service from September 12, 2024, through September 15, 2025, in part because replacement parts were no longer available. Since 2024, the City has spent more than $4,000 on repairs. The truck is the Water Department’s only service truck and carries the tools and parts needed to perform repairs to the water system. On September 1, 2026, the F-450’s check-engine light illuminated. The diagnostic code is similar to the code associated with the prior PCM failure, indicating that the PCM may be beginning to fail again. Replacing this vehicle will help maintain the department’s ability to respond to and complete water system repairs. Once the replacement truck is in service, the 2010 F-450 will be declared surplus and sent to auction.
The Sewer Department’s 2010 Ford F-350 utility truck has approximately 79,034 miles and proposes replacing it with a 2027 Ford F-350 equipped with a utility bed and lift gate. The vehicle being replaced is not equipped with a much needed lift gate. The existing F-350 will continue to be used by the Streets and Building Departments. Once a new truck is in service, a 2010 F150 will be declared surplus and sent to auction.
The City of Williams obtained three separate bids for both truck models. All of the bids included Scelzi truck beds which are heavy duty commercial grade work truck bodies. The quotes which includes taxes and fees are as follows:
Dealer 2027 F350 Truck 2027 F450 Truck
Geweke Ford $62,710.59 $94,866.92
Corning Ford $63,566.85 $95,284.10
Hoblit Ford $63,599.86 $98,147.01
Geweke Ford out of Yuba City had the lowest bids for both trucks and staff would like to move forward with both purchases from this dealership. Geweke Ford has also agreed to deliver the two trucks to the City of Williams at no additional delivery charge.
FISCAL IMPACT
The purchase of the 2027 Ford F-350 utility truck will be funded by the Sewer Enterprise Fund. The purchase of the 2027 Ford F-450 service truck will be funded by the Water Enterprise Fund. Sufficient funding is available in each of the enterprise funds to cover the vehicle purchases. The City has reached out to Janus Solar for a potential Water Enterprise donation of $85k to be used towards the purchase of the F-450 Water Enterprise Truck. In addition, proceeds from the sale of surplus enterprise vehicles will be deposited into the proper enterprise fund.
ALTERNATIVES
Do not authorize purchase of the new trucks and continue operating with the existing vehicles which have experienced mechanical issues and repair costs.
RECOMMENDATION
Authorize the purchase of one 2027 Ford F-450 service truck using Water Enterprise Fund monies and one 2027 Ford F-350 utility truck with utility bed and lift gate using Sewer Enterprise Fund monies.
Authorize a budgetary increase of $94,867 and $62,711 for the Water and Sewer Enterprise Funds.
Authorize the 2010 Ford F-450 and the 2010 Ford F-150 to be declared surplus and sent to auction once the replacement truck is placed in service.
Prepared and Submitted by: Bobby Alvernaz, Public Works Superintendent and Rex Greenbaum, Finance Director
Reviewed by: Yvonne Kimball, City Manager
Sewer Enterprise F350 Vehicle: Water Enterprise F450 Vehicle:
City of Williams DATE: October 21, 2026
City Council ITEM: 18.
Agenda Report CATEGORY: New Business
SUBJECT
Discussion and Possible Action to Approve First Amendment to Employment Agreement with City Manager Yvonne Kimball
BACKGROUND / DISCUSSION
Following the City Manager’s positive performance review at the August City Council meeting, the City Council directed the City Attorney to negotiate an amendment to the City Manager’s employment agreement.
Based on those negotiations, the draft amendment proposes the following changes:
1. Extending the initial term of the agreement to a total of five years, ending on February 18, 2031
2. Increasing the base salary of the City Manager by $3,500 from $175,000 to $178,500
3. Providing the City Manager with a $500 per month vehicle allowance
4. Modifying the severance pay provisions of the agreement to gradually increase the severance pay from three months to six months, depending on longevity with the City
FISCAL IMPACT
The fiscal impact associated with this item would be an annual increase of $3,500 to the City Manager’s base salary and an annual increase of $3,000 in vehicle allowance for a total fiscal impact of $6,500.
RECOMMENDATION
Staff and the City Attorney recommend the City Council review, discuss, and consider adoption of the draft First Amendment to the Employment Agreement with City Manager Yvonne Kimball.
ATTACHMENTS
1. Draft First Amendment of Employment Agreement Between City of Williams and Yvonne Kimball
2. Employment Agreement Between City of Williams and Yvonne Kimball
FIRST AMENDMENT OF EMPLOYMENT AGREEMENT
BETWEEN CITY OF WILLIAMS AND YVONNE KIMBALL
The Employment Agreement ("Agreement") executed on or about February 18, 2026 by and between the City of Williams, California (“City”), and Yvonne Kimball (“Employee”) is hereby amended effective October 21, 2026 by this amendment (“First Amendment”), as set forth below:
1. The text of Section 3-A is amended to read:
Term. This Agreement shall be for an initial term of five (5) years, beginning February 19, 2026 and ending February 18, 2031. This term is subject to the Employee’s and City’s right to terminate this Agreement and Employee’s employment at any time pursuant to the terms of this Agreement.
2. The text of Section 4-A is amended to read:
Salary. City agrees to pay Employee for services rendered a base salary of One Hundred and Seventy-Eight Thousand Five Hundred Dollars ($178,500) per year, less required and authorized deductions, in periodic installments at the same time as other employees of the City are paid. City agrees to provide Employee with the same annual cost of living adjustment granted to management employees, if any.
3. The text of Section 4-B is amended to read:
Vehicle Allowance. City agrees to pay Employee a vehicle allowance of Five Hundred Dollars ($500) per month. This amount will be treated and paid as taxable income to Employee.
4. The text of Section 6-B is amended to read:
Severance Pay. If Employee and this Agreement are terminated without cause, City agrees to provide Employee with severance pay in a lump sum cash payment equal to four (4) months’ base salary until February 18, 2027, five (5) months’ base salary from February 19, 2027 until February 18, 2028, six (6) months’ base salary starting on February 19, 2028, or the remaining term of this Agreement (whichever is less), less deductions required by law, and subject to the following condition. Payment of severance pay shall be conditioned upon Employee executing a release and waiver of any and all claims against City, its officers, employees and agents, arising out of Employee’s employment with City, and the termination thereof, in such form as may reasonably be required by City.
Severance pay shall not be payable unless and until Employee executes such release and waiver and all revocation rights as provided by law have expired. The intent is that this Agreement is construed in compliance with Government Code section 53260.
5. Except as specifically amended above, all other provisions of the Agreement shall remain in full force and effect.
IN WITNESS THEREOF, the parties have executed this First Amendment to the Agreement as of dates set forth below, however, all terms of this Amendment shall be effective on October 21, 2026.
CITY OF WILLIAMS EMPLOYEE
_____________________________ _____________________________ Kate Dunlap, Mayor Yvonne Kimball
_____________________________ _____________________________ Date Date
APPROVED AS TO FORM:
_____________________________
Andreas Booher, City Attorney
_____________________________
Date
EMPLOYMENT AGREEMENT
BETWEEN CITY OF WILLIAMS AND YVONNE KIMBALL
This Employment Agreement ("Agreement") is entered into this 18th day of February, 2026 by and between the City of Williams, California ("City"), and Yvonne Kimball ("Employee").
WHEREAS, the City requires the services of a City Manager; and WHEREAS, Employee agrees to provide the necessary skills and expertise of a City Manager beginning February 19, 2026; and
WHEREAS, the City, acting by and through its City Council, desires to employ the services of Employee and to appropriately compensate Employee for such services.
NOW, THEREFORE, in consideration of the mutual covenants and conditions, the parties agree as follows:
Duties and Authority. City hereby confers upon and delegates to Employee all of the duties, powers, and responsibilities of City Manager as set forth in Section 2.06 of the Williams Municipal Code, the ordinances, resolutions, policies, rules, and regulations of the City. Employee is subject to the direction and oversight of the City Council.
2. Days and Hours of Work.
A. Hours. The City Manager is a full-time, exempt employee who is expected to devote the hours necessary to fulfill the obligations of the position.
Location of Work. Employee shall, each business week, work Monday through Friday at the City and/or in City Hall, during normal business hours. Employee shall also be available at City, as reasonably needed, for meetings, projects, and other similar or non-routine special events or circumstances.
C. Full Energy and Skill. Employee shall faithfully, diligently, and to the best of Employee's abilities, perform all duties that may be required under this Agreement. Employee agrees that Employee has a duty of loyalty and a general fiduciary duty to the City. Employee shall devote the whole of Employee's working time, skill, experience, knowledge, ability, labor, energy, attention and best effort exclusively to the City's business and affairs.
Term of Employment.
A. Term. Subject to the Employee's and City right to terminate this Agreement and Employee's employment at any time pursuant to the terms of this Agreement, this Agreement shall be for an initial term of three (3) years, beginning February 19,