Cities Index.
Agenda packet

Woodland City Council
June 18, 2024

Document
Agenda packet
Meeting
June 18, 2024
Body
Woodland City Council
Pages
704
Original file
19.7 MB
Text extracted from the city's file for reading and search. Open the original on woodlandca.api.civicclerk.com. That file is the official record.

Division V: Definitions
Woodland Comprehensive Zoning Code | V-31
Tire Retreading and Capping. A business involved in the retreading, recapping, or rebuilding of tires using previously processed rubber or synthetic products.

Washing, Full Service. Washing, waxing, or cleaning of automobiles or similar light vehicles, with hands-on service by employees who may move, vacuum, wash, wax, and dry the vehicle.

Includes an interior or exterior waiting facility for customers and may include ancillary retail and/or food and drink service for waiting customers.

Washing, Self-Serve. Includes self -serve washing facilities that are the principal use of a building, structure, or site, e ither self-wash facility or drive through automated wash with no or limited-employee assistance. No on-site waiting facility is provided for customers.

Banks and Financial Institutions.

Bail Bonds. A business which provides bond money, for a fee, to meet bail requirements for the release of a person arrested and awaiting a hearing or trial.

Bank and Savings and Loan. A financial institution, including a credit union office or check cashing service, that provides retail banking services to individuals and businesses. This classification includes only those institutions engaged in the on-site circulation of cash money.

Non-Traditional Financial Institution. An establishment engaged in short -term lending and buy-back activities in which customers typically take part in one -time or infrequent transactions and do not open long-term accounts or deposit funds. Typical uses include check cashing services, payday lenders (also known as deferred deposit origina tors), and similar activities.

Brewery. An independent regional brewery with a majority of volume in “traditional” or “innovative” beers. Typical annual production may be between 15,000 and 6,000,000 barrels.

Building Materials and Supply. Retail sales or rental of building supplies or equipment. This classification includes finished lumber for purchase, tool and equipment sales, or rental establishments.

Business and Communication Services.

General Business Services. An establishment primarily engaged in providing services to other businesses on a fee or contract basis, including advertising and mailing, legal document services, security services, janitorial services, model building, and taxi services or delivery services with two or fewer fleet vehicles on-site.

Printing and Copy Services. An establishment providing printed or copied materials from digital or hard copy format originals, including printing and distribution of envelopes, business cards, and similar business products.

Cannabis Uses.

Cannabis Distribution. Any facility engaged in the procurement, temporary storage, non-retail sales, and transport of cannabis or cannabis products between State -licensed cannabis business, including warehouses and similar structures.

Cannabis Manufacturing, Volatile and Non-Volatile. The compounding, blending, extracting, infusing, or otherwise making or preparing a cannabis product. For purposes of this Title, cannabis manufacturing expressly includes the production, preparation, propagation,

Page 512 ends

Division V: Definitions
V-32 | Woodland Comprehensive Zoning Code
processing, or compounding of cannabis or cannabis products directly or indirectly, including through extraction and/or chemical synthesis methods. Cannabis manufacturing may include distribution of wholesale products from the premises but shall not include any ret ail sales of cannabis or cannabis products or other sales to consumers.

Indoor Personal Cannabis Cultivation. Any activity involving the planting, growing, harvesting, drying, curing, grading, or trimming of cannabis licensed by the State and intended for commercial sale. For purposes of this Title, cannabis cultivation does not mean or include personal cultivation of cannabis regulated by Section 17.84.280, Personal Cultivation of Cannabis.

Cannabis Retail. A premises permanently located in the City licensed by the State of California pursuant to the Medicinal and Adult -Use Cannabis Regulation and Safety Act, California Business and Professions Code § 26000 et seq., as may be amended, where cannabis is provided for retail sale to consumers, including an establishment that delivers cannabis as part of a retail sale. Unless otherwise specified, “cannabis retailer” means both a retailer selling medical ca nnabis and medical cannabis products to patients with valid physician’s recommendations, and a retailer providing adult -use cannabis and cannabis products for adults 21 years of age and over, pursuant to State law.

Cannabis Testing, Research and Developmen t. A laboratory, facility, or entity that offers or performs tests or testing of cannabis or cannabis products, including accredited testing laboratories licensed by the State and involved in commercial cannabis activity in the State.

Cannabis laboratories and research also includes start -up or incubator research activities, which typically include, but are not limited to, research, design, analysis, development, and/or testing of a cannabis product, and laboratories or facilities engaged in scientific rese arch studies, investigation, testing, or experimentation, but not including cannabis manufacturing or sales of cannabis.

Cemetery. An establishment engaged primarily in operating sites or structures reserved for the interment of human or animal remains, including mausoleums, burial places, and memorial gardens.

College and Trade School. Institutions of higher education providing curricula of a general, religious, or professional nature, typically granting recognized degrees, including conference centers and academic retreats associated with such institutions. This classification includes junior colleges, business and computer schools, management training, and technical and trade schools, but excludes personal instructional services such as music lessons.

Communications Facilities. Facilities for the provision of broadcasting and other information relay services through the use of electronic and telephonic mechanisms.

Antennas and Transmission Towers. Broadcasting and other communication services accomplished through electronic or telephonic mechanisms, as well as structure designed to support reception or transmission systems. Typical uses include wireless telecommunication towers and facilities, radio towers, television towers, telephone exchange /microwave relay towers, and cellular telephone transmission/personal communications systems towers.

Equipment within Buildings. Indoor facilities containing primarily communication equipment and storage devices such as computer servers.

Page 513 ends

Division V: Definitions
Woodland Comprehensive Zoning Code | V-33
Community and Religious Assembly. A facility for public or private meetings including community centers, banquet centers, religious assembly facilities, dance halls, civic auditoriums, union halls, meeting halls for clubs and other membership organizations. This classificat ion includes functionally related facilities for the use of members and attendees such as kitchens, multi -purpose rooms, and storage. It does not include gymnasiums or other sports facilities, convention centers, or facilities, such as day care centers and schools that are separately classified and regulated.

Community Garden. An area of land managed and maintained by a public or non-profit organization or a group of individuals to grow and harvest food crops and/or ornamental crops, such as flowers, for pe rsonal or group use, consumption, or donation. Community gardens may be divided into separate plots for cultivation by one or more individuals or may be farmed collectively by members of the group and may include common areas maintained and used by group m embers. Community gardens may be accessory to public or institutional uses such as parks, schools, community centers, or religious assembly uses. This classification does not include gardens that are on a property in residential use when access is limited to those who reside on the property. Community Gardens to not include Medical Marijuana Collectives.

Construction Office. A temporary structure or trailer placed on or adjacent to a project site for the duration of construction. May include a construction materials yard. Also referred to as a Job Shack.

Crematorium. A place with a building or structure containing a furnace used for the reduction of human remains by way of incineration.

Cultural Facility. A facility engaged in activities to serve and promote aesthetic and educational interest in the community that are open to the public on a regular basis. This classification includes performing arts for theater, music, dance, and events as an accessory use; spaces for display or preservation of object s of interest in the arts or sciences; libraries; museums; historical sites; aquariums; publicly owned art galleries; and zoos and botanical gardens. It does not include schools or institutions of higher education providing curricula of a general nature.

Day Care Center . Establishments providing non -medical care for persons on a less -than-24-hour basis other than Family Day Care (Small and Large). This classification includes non-home based commercial and nonprofit nursery schools, preschools, day care faci lities for children or adults, and any other day care facility licensed by the State of California.

Drive-Through Facility. A motor vehicle drive -through facility which is a commercial building or structure portion thereof which is designed to be used to provide goods or services to the occupants of motor vehicles.

Drive-Through, Food Establishment. Includes drive-through for food establishments.

Drive-Through, Limited. Includes but is not limited to banks, pharmacies, or other similar uses. Does not include drive in movies, fueling stations, car -wash operations, or food establishments.

Duplex. A residential building containing two dwelling units, both of which are locat ed on a single parcel (also referred to as a duplex or two -flat). The dwelling units are attached and may be located on separate floors or side by side. This use is distinguished from an accessory dwelling unit, which is considered a secondary residential unit, or incidental to a primary dwelling unit as defined by State law and this Chapter.

Page 514 ends

Division V: Definitions
V-34 | Woodland Comprehensive Zoning Code
Eating and Drinking Establishments. Businesses primarily engaged in serving prepared food and/or beverages for consumption on or off the premises.

Bar/Night Club/Lounge. A business serving beverages for consumption on the premises as a primary use and including on -sale service of alcohol including beer, wine, and mixed drinks.

This use includes karaoke bars and micro -breweries where alcoholic beverages are sold and consumed on site and any food service is subordinate to the sale of alcoholic beverages.

Brewpub. A full-service or limited-service restaurant with a micro-brewery as an accessory use.

A brewpub may sell other supplier’s beer, including other hand -crafted or micro- brewed beers as well as wine to patrons for consumption on its premises.

Microbrewery. A brewery that produces up to 15,000 barrels of beer per year. Generally, no more than 75 percent of the total gross floor space is involved in brewing. Microbreweries sell to the public either as wholesale or retail capacity. Microbreweries do not include food service.

Micro-Distillery. A small, often boutique-style distillery established to produce beverage grade spirit alcohol in relatively small quantities, usually done in single batches (as opposed to larger distillers’ continuous distilling process). Typically, no more than 15,000 U.S. gallons of spirits per year. May include a restaurant, bar, or tasting room.

Restaurant, Full Service. A restaurant p roviding food and beverage services to patrons who order and are served while seated and pay after eating. Takeout service may be provided.

Restaurant, Limited Counter Service/Fast Casual Food. An establishment where food and beverages are consumed on the premises, taken out, or delivered, but where limited table service is provided. Includes cafes, cafeterias, coffee shops, delicatessens, fast -food restaurants, sandwich shops, limited-service pizza parlors, self-service restaurants, and snack bars with ind oor or outdoor seating for customers. This classification includes bakeries that have tables for on-site consumption of products. Excludes drive-through establishments.

Tasting Room. A retail sales facility where customers may taste and purchase beverage and food products, grown or processed on site or locally. Products offered for tasting and sale may include wine, beer, olive oil, cheese, honey, and/or other food and beverage products.

Emergency Shelter. Any facility whose primary purpose is to provide temporary shelter housing with minimal supportive services for homeless persons that is limited to occupancy of six months or less by a homeless person. No individual or household may be denied emergency shelter because of an inability to pay. Emer gency shelter shall include other interventions, including, but not limited to, a navigation center, bridge housing, and respite or recuperative facilities. Emergency shelters do not include evacuation shelters during emergencies.

Emergency Services. Facilities for parking and the dispatch of emergency medical transport services, including ambulance, fire, police, and rescue. May include offices and facilities for cooking and sleeping of on-duty personnel.

Family Day Care. A day care facility licensed by th e State of California, located in and accessory to a residential unit where the resident of the dwelling provides care and supervision for children under the age of 18 for periods of less than 24 hours a day. Family Day Care also includes adult in-home day care that is less than 24 hours a day.

Page 515 ends

Division V: Definitions
Woodland Comprehensive Zoning Code | V-35
Family Day Care, Small. A facility that provides care for children, including children who reside at the home and are under the age of 10, as set forth in California Health and Safety Code § 1597.44 and as defined in those regulations.

Family Day Care, Large. A facility that provides care for children, as defined in California Health and Safety Code § 1596.78, including children who reside at the home and are under the age of 10, as set forth in California Health and Safety Code § 1597.465 and as defined in those regulations.

Farmers Market. A location where the primary activity is the sale of agricultural products by producers and certified producers. Sales of ancillary products may occur at the location. Op en-air farmers markets are operated by a local government agency only.

Food and Beverage Manufacturing. Establishments engaged in the production, processing, packaging, or manufacturing of food or beverage products and any instruction, direct sales, or on site consumption are incidental to the food or beverage production activity. These uses may have specific quality assurance and quality control to ensure that ingredients and finished products are tested and meet safety and quality specifications.

Small Scale. A small-scale food and beverage products manufacturing and distribution establishment located in facilities less than 10,000 square feet in size. Examples include small coffee roasters, micro -breweries (manufacturing less than 15,000 barrels per year or less), micro-distilleries (manufacturing 10,000 barrels per year or less), wine manufacturing, meat or fish products, small batch candy shops, cheese makers, wholesale bakeries, and brew -on- premises stores which provide ingredients and equipment for customers to manufacture their own product.

Large Scale. Large scale production, packaging, processing, pr eparation, or manufacturing of a food, beverage, or ingredient used or intended for use by human consumption in a facility over 10,000 square feet. This classification includes such uses as bottling of alcoholic or non - alcoholic beverages, milling of grai n, canning, processing , extracting, fermenting, distilling, pickling, freezing, baking, drying, smoking, grinding, cutting, mixing, coating, stuffing, packing, bottling or packaging of food; coffee roasting; food products; brewing; and distillation of liquor and spirits. This use may include multiple food preparation and packaging/canning lines where processes are both interior and exterior to buildings. This use also involves warehousing and outdoor storage including, but not limited to, pallets, bins, trailers, crates, and process -related construction materials and equipment. Ancillary office space is also consistent with this use. The parking and storage of trucks, trailers, service vehicles, and other vehicles used in connection with the operati on is also permitted in this use designation. This does not include slaughtering of animals, fowl, or direct retail sales.

Food Preparation. A business that prepares and/or packages food for off -site consumption, excluding those of an industrial characte r in terms of processes employed, waste produced, water used, and traffic generation. Typical uses include catering kitchens, bakeries with on -site retail sales, commercial kitchens, and small -scale specialty food production. This classification does not i nclude businesses involved in the processing or manufacturing of wholesale food products.

Freight Storage Yard. A site or facility for the keeping of empty cargo containers and equipment .

Includes the storage of container chassis and truck cabs, repair fac ilities, warehouses and other equipment associated with the movement or storage of cargo containers.

Page 516 ends

Division V: Definitions
V-36 | Woodland Comprehensive Zoning Code
Freight/Trucking Facilities. Any property and improvements used for freight, courier, and postal services, freight transfer truck terminals ; or the operations of a common carrier trucking company including the parking, servicing, repairing, storage of trucks, truck tractors, semi-trucks, and/or truck trailers. Allowed as an accessory use only.

Funeral and Interment Service. An establishment primarily engaged in services involving the care, preparation, or disposition of human dead other than in a cemetery. Does not include crematoriums.

Garage or Yard Sale. A sale conducted from any location on the premises of a residence in any kind of reside ntial zone for the purpose of permitting occupants of that residence to dispose of their personal property accumulated during the course of ordinary residential living to sell the same to the public.

Government Buildings. Facilities providing administrative or public services, including public safety and emergency services, with incidental storage, training, and maintenance facilities. Review of such uses will be dependent upon the government agency and the proposed use. I f an agency owns the land and the use is for the purpose of that agency, the City may not have review oversight. This use includes publicly-owned and operated surface parking lots and parking structures offering parking to the public with or without a fee.

Hazardous Waste Management Facilities. A facility, excluding vehicles, for collection, source separation, storage, processing, treatment, recovery or disposal of hazardous wastes, or a transfer station for hazardous waste, and may include a facility at which such activities occur and where waste has been generated Storage of hazardous materials include, but are not limited to: bottled gas, chemicals, minerals and ores, petroleum or petroleum-based fuels, and fireworks (California Code of Regulations Title 22, Division 4.5, Chapter 10).

Heliport. Helicopter landing area used, designed, or intended to be used for the receiving or discharging of passengers and cargo and including appurtenant facilities for passengers, cargo, or for the servicing, repair, shelter, or storage of helicopters.

Home Occupations. Any accessory use conducted entirely within a dwelling, accessory building, or swimming pool, and carried on by the inhabitants thereof, which use is clearly incidental and secondary to the use of the dwelling for residential purposes and does not change the character thereof or adversely affect the uses permitted in the resident ial zone of which it is part (see Section

17.84.200, Home Occupations and Cottage Food Operations).

Hookah Lounge. Any facility or location whose business operation includes the smoking of tobacco or other substances through one or more pipes (commonly known as a hookah, waterpipe, shisha, or narghile) designed with a tube passing through an urn of water that cools the smoke down as it is drawn through it.

Hospitals and Clinics.

Clinic. A facility providing medical, mental health, or surgical services for sick or injured persons exclusively on an out -patient basis, including emergency treatment, urgent care, cosmetic, diagnostic services, administration, and related services to patients who are not lodged overnight. Services may be provided without a prior appointment. Treatment is typically provided by more than two licensed physicians and their professional associates. May include the provision of medical testing and analysis services as an ancillary use. This classification includes licensed facilities o ffering substance abuse treatment, blood banks,

Page 517 ends

Division V: Definitions
Woodland Comprehensive Zoning Code | V-37
plasma, dialysis centers, and emergency medical services. It does not include private medical and dental offices that typically require appointments and are usually smaller scale.

Hospital. A facility providing medical, surgical, mental health, or services primarily on an in - patient basis, and including ancillary facilities for outpatient and emergency treatment, diagnostic services, training, research, administration, and services to patients, employees, or visitors.

Skilled Nursing Facility. A range of facility types that provides bed care on a chronic basis or convalescent care for persons who by reason of illness, physical infirmity, or age are unable to properly care for themselves for a period of time. A patient’s stay at a skilled nursing facility is usually temporary in nature and is focused on rehabilitation that is intended to prepare the resident to return to their independent living. Extended care provides for the prolonged care of individuals who require custodial or nursing care. Assisted living services typically provide assistance with bathing, dressing, grooming, medications, and meal preparation in a setting that is, by design, residential in nature and is intended not to be temporary.

Industrial, Heavy. Establishments engaged in the manufacturing of non-edible products that include processing, manufacturing, or compounding of materials, or energy, or any industrial activities that, due to the scale or method of operation, regul arly produce noise, heat, glare, dust, smoke, fumes, odors, vibration, or other external impacts detectable beyond the lot lines of the property. Includes the use of raw materials to fabricate semi-finished products including metal fabricating facilities, open welding shops, lumber woodworking (milling) facilities, heavy machine shops, chemical storage and distributing, industrial fabrication facilities, concrete product manufacturing activities, and aggregate or asphalt yards. Includes structures outside o f the primary structure such as cranes, conveyor systems, cooling towers or open -air storage of large quantities of raw, semi -refined, or finished products. Heavy industrial uses may regularly employ hazardous material or procedures or produce hazardous by -products, include outdoor storage areas, and may have activities that take place outdoors. There is no general public access.

Industrial, Light. Establishments engaged in the manufacturing of non-edible products and finished parts primarily from previously-prepared materials by means of physical assembly or reshaping. This classification includes uses where retail sales are clearly incidental to an industrial or manufacturing use. Production takes place primarily within enclosed buildings with limited impa cts on nearby properties. Any heat, glare, dust, smoke, fumes, odors, or vibration are confined to the building. These uses typically have more employees per acre than other industrial uses and are more consumer - oriented. May include a showroom or ancillar y sales of products related to the items manufactured on-site. Often includes buildings that are smaller scale, under 50,000 square feet, or in multi -tenant type configurations, with office and production area combined. Uses typically use vans and light du ty box trucks rather than semi -trucks. Examples include the manufacturing of personal care and home care products, cosmetics, printing, engraving, publishing, clothes and shoes, furniture, art ware and crafts, consumer electronics, and sign manufacture sho ps. Limited outdoor processing and storage of materials may require a permit in some zones.

Industrial, Medium. Establishments engaged in the manufacturing of non -edible products that are larger in scale and size than light industrial uses and involve the manufacturing of products from processed or unprocessed raw materials, where the finished product is non -combustible and non - explosive. On -site manufacturing may produce noise, vibrations, illumination, or particulate that is perceptible to adjacent land uses, but is not offensive or obnoxious. May involve inter-plant transfers.

Page 518 ends

Division V: Definitions
V-38 | Woodland Comprehensive Zoning Code
Uses are typically accesses by semi -trailer truck, tractor - trailer truck (18 -wheeler, fifth -wheel, box - trailer) and include truck bays to accommodate semi-truck trips.

Examples in clude but are not limited to research, development, and manufacturing of finished or semi-finished products; the packaging of products manufactured on site; glass production made from manufactured glass, clay, and pottery products; wood truss assembly; com puter hardware; products made from rubber, plastic, resin; converted paper and cardboard products; fabricated metal products made from semi-finished metals. Limited outdoor processing and storage of materials may require a permit in some zones.

Laundry and Dry-Cleaning Plants. A facility engaged in the cleaning of fabrics in an essentially non - aqueous solvent by means of one or more washes in solvent and extraction of excess solvent. Does not include drop-off and pick-up for dry cleaners.

Light Fleet Based Services. Passenger transportation services, local delivery services, medical transport, and other businesses that rely on fleets of three or more vehicles with rated capacities less than 10,000 lbs. This classification includes parking, disp atching, and offices for taxi cab, and limousine operations, ambulance services, non -emergency medical transport, local messenger and document delivery services, home cleaning services, and similar businesses.

Live/Work. A unit that combines a work space f or commercial activities and incidental residential occupancy occupied and used by a single household in a structure that has been constructed or converted for such use and modified to accommodate residential and non-residential occupancies in compliance with the Building Code.

Lodging. An establishment providing overnight lodging to transient patrons.

Bed and Breakfast. A residential structure that is in residential use by the property owner or manager and within which bedrooms are rented for overnight lodging and where meals may be provided.

Boarding House. A dwelling unit, other than a hotel, bed and breakfast, or condominium hotel, used in whole or in part to provide short -term or long-term lodging for compensation under multiple separate written or oral agreements. Also known as Rooming House.

Hotel and Motel. An establishment providing temporary lodging to transient patrons. These establishments may provide additional services, such as conference and meeting rooms, restaurants, bars, or recreation facilities available to guests or to the general public. This use classification includes motor lodges, motels, apartment hotels, and tourist courts.

RV Park Resort. A form of lodging designed to accommodate travelers with recreational vehicles for short-term overnight vacation stays, on a nightly or weekly basis, in allotted spaces, or for occupancy by tents or other movable temporary sleeping quarters. RV Park resorts are self -contained and provide amenities to the clients, including , but not limited to, barbecue areas, bathhouses, exercise equipment, tennis courts, gift store, laundry, and swimming pool.

Short-Term Rental. Rental of a dwelling unit for 30 or fewer consecutive days. Provides a room or rooms in a private home. A permanent resident must reside at the property and be present in the home during the time of the homestay.

Page 519 ends

Division V: Definitions
Woodland Comprehensive Zoning Code | V-39
Low Barrier Navigation Center. A housing first, low -barrier, service -enriched shelter focused on moving people into permanent housing that provides temporary living fac ilities while case managers connect individuals experiencing homelessness to income, public benefits, health services, shelter, and housing. (See California Government Code § 65660.)
Maintenance and Repair Services. Establishments engaged in the maintenance or repair of small office machines, household appliances, furniture, and similar items. This classification excludes maintenance and repair of vehicles or boats (see Automotive Sales and Services) and personal apparel (See Personal Services).

Manufactured Home Park. As defined in California Health and Safety Code § 18214, a manufactured home park is a mobile home development constructed according to the requirements of California Health and Safety Code §§ 18200 to 18700 and intended for use and sale as a mobile home condominium or cooperative park, or as a mobile home planned unit development.

Mobile Vendor. A self-contained truck or trailer or non -motorized push cart that is readily movable without disassembling, and is u sed to sell merchandise, prepare , and serve food and beverages, or provide other services that requires a permit as provided for in the Woodland Municipal Code Section

10.20.040, Mobile vendor permit required.

Multi-Unit Dwelling. Three or more units on a single lot. Accommodates a broad range of attached multi-unit housing types including triplex, fourplex, townhouses, and stacked apartments or condominiums. Units may be contained in single structures or in a collection of cohesive structures with common open spaces and amenities.

Office Uses. Offices of firms or organizations providing professional, executi ve, management, administrative or design services. This classification also includes offices where medical and dental services are provided by physicians, dentists, chiropractors, acupuncturists, optometrists, including medical/dental laboratories within medical office buildings, but excludes clinics or independent research laboratory facilities.

Business, Professional, and Technology. Offices of private firms or organizations or public or quasi-public organizations that are primarily used for the provision of professional, executive, management, or administrative services. Typical uses include administrative offices, tax preparation, legal offices, graphic design, legal, accounting, engineering or architectural firms, employment agencies, insurance agent offices, real estate offices, travel agencies, utility company offices, and offices for elected officials. Excludes banks and savings and loan associations (see Banks and Financial Institutions) and any drive-up service.

Medical and Dental Offices. Uses primarily engaged in the provision of personal health services including consultation, diagnosis, therapeutic, preventative, or corrective personal treatment by physicians, dentists, nurses, chiropractors, optometrists, counselors, and other health personnel, including practitioners of medical and/or healing arts as licensed for such practice by the State. Provides for treatment by up to two licensed physicians, dentists, and their professional associates. Excludes clinics or independent research laboratory facilities and hospitals (see Hospitals and Clinics).

Outdoor Sales, Temporary and Seasonal. The sale or offering for sale to the general public of merchandise outside of a permanent structure on property owned or leased by the person, firm, or

Page 520 ends

Division V: Definitions
V-40 | Woodland Comprehensive Zoning Code
corporation. These sales are of a limited duration and conducted on an occasional basis and are secondary or incidental to the principal permitted use or structure existing on the property.

Pallet Storage. A site or facility for the keeping of pallets and similar transport structures intended to support goods while being lifted by a forklift, front loader, jacking device, crane, or similar equipment.

Park and Recreation Facility, Public. Parks, playgrounds, recreation facilities, trails, wildlife preserves, and related open spaces, all of which are noncommercial. This classification also includes playing fields, courts, gymnasiums, swimming pools, picnic facilities, tennis courts, and golf courses, botanical gardens, as well as related food concessions or community centers within the facilities.

Parking Facilities. Privately owned or operated surface lots and structures offering parking to the public with or without a fee. Commercial parking facilities provide parking that is not considered accessory parking to a specific use. Does not include truck storage or car rental storage. Private parking may be considered on a case-by-case basis as an accessory use to a primary use.

Personal Services.

Dry Cleaner/Self Service Laundry. A facility where coin -operated equipment for self -service laundering is open to the public. May include dry cleaning drop -off/pick-up. Excludes dry cleaning facilities and bulk cleaning plants.

General Personal Services. Services of a personal nature that are typically needed on a recurring basis. Services include but are not limited to barbershops and beauty sa lons, nail salons, personal trainers, day spas, clothing rental, seamstresses, tailors, dry cleaning drop - off/pick-up (excluding cleaning plants), shoe repair shops, photocopying, and photo finishing services. These uses also may include accessory retail sales of products related to the services provided.

Instructional Services. An establishment that offers specialized programs in personal growth and development such as music, martial arts, photography, vocal, fitness, yoga, dancing, and academic tutoring. Attendance is typically limited to hourly classes rather than full -day instruction. These establishments do not grant diplomas or degrees, though instruction could provide credits for diplomas or degrees granted by other institutions. Retail sales are permitted as an accessory use.

Massage Establishments. Any establishment having in whole or in part, a fixed place of business where individuals engage in, conduct or carry on, or permit to be engaged in, conducted or carried on, massages, baths, health treat ments involving massages or baths as a primary or secondary function, provided that “massage establishment” does not include establishments where massage is administered in conjunction with the practice of a medical doctor, chiropractor, acupuncturist, physical therapist, or nurse.

Tattoo/Body Modification Parlor. An establishment whose principal business activity is one or more of the following: 1) using ink or other substances that result in the permanent coloration of the skin through the use of needles or other instruments designed to contact or puncture the skin; or 2) piercing of the body of a person for the purpose of inserting jewelry or other decoration.

Page 521 ends

Division V: Definitions
Woodland Comprehensive Zoning Code | V-41
Public Services, Major. Services for the public that include water treatment facility, wastewate r treatment facility, corporation yard, and other services that provide major public infrastructure services for urban development.

Public Services, Minor. Facilities necessary to support established uses involving only minor structures, such as substations, pumping stations, electrical distribution lines, and underground water and sewer lines.

Recreation, Fitness and Entertainment.

Cinema/Theater. An establishment intended to be used for the specific purposes of presenting or displaying motion pictures, slides, or television pictures before an assemblage of persons.

Indoor Entertainment Facility. Indoor entertainment establishments that occupy less than 5,000 square feet of building area, including billiard parlors, axe throwing, game arcades, pool halls, and amusement arcades. Does not include Cinema/Theater.

Indoor Sports and Recreation, Large -Scale. Facilities with more than 5,000 square feet in building area providing participant sports, indoor amusement and entertainment services conducted within an enclosed building. Includes coin-operated electronic amusement centers, ice or roller skating rinks, bowling alleys, indoor shooting ranges. Does not include Cinema/Theater.

Indoor Sports and Recreation, Small -Scale. Facilities that are generally located indoors and occupy less than 5,000 square feet of building area. Includes gyms, exercise clubs, and studios offering martial arts, physical exercise, yoga training, or similar types of instruction to classes and groups.

Outdoor Sports and Recreat ion Facility. Amusement or sports related facilities that are conducted in open or partially enclosed or screened facilities. Facilities such as amusement and theme parks, amphitheaters, golf courses, driving ranges, and golf courses. Also includes larger swimming or tennis club facilities, swimming or wave pools, miniature golf courses, archery range.

Recycling Facilities.

Collection. A drop -off/collection and sorting point for recyclable materials such as paper, metal, plastic, and glass. A Recycling Collection Facility is accessory to a primary use.

Processing. An industrial facility where recycled materials are processed into new materials or products.

Reverse Vending Machine. An automated mechanical device which accepts at least one or more types of empty beverage containers including, but not limited to, aluminum cans, glass, and plastic bottles, and issues a cash refund or a redeemable credit slip with a value not less than the container’s redemption value as determined by the State. A reverse vending machine may sort and process containers mechanically provided that the entire process is enclosed within the machine. A bulk reverse vending machine is a type of reverse vending machine that

Page 522 ends

Division V: Definitions
V-42 | Woodland Comprehensive Zoning Code
is larger than 50 square feet; is designed to accept more than one container at a time; and will pay by weight instead of by container.

Research and Development. A facility for the scientific research and the design, development, and testing of agri-tech, electrical, electronic, magnetic, optical, pharmac eutical, chemical, biotechnology, plant breeding, seed research, and life science components and products in advance of product manufacturing. This classification includes assembly of related products from parts produced off site, where the manufacturing activity is secondary to the research and development activities, in addition to involving the production of experimental products. Excludes uses that produce odor, dust, noise, bright lights, vibration, or the storage of hazardous material, including bioha zards, that threaten public safety.

Residential Care Facilities. A facility licensed by the State of California to provide living accommodations, 24 -hour care for persons requiring personal services, supervision, protection, or assistance for sustaining the activities of daily living. Living accommodations are group homes or shared living quarters with or without separate kitchen or bathroom facilities for each room or unit.

This classification includes facilities that are operated for profit as well as those operated by public or not-for-profit institutions.

Small. A facility that is licensed by the State of California to provide care for six or fewer persons. A Residential Care Facility, Small is considered a single -unit residential use.

Large. A facility that is licensed by the State of California to provide care for more than six persons. This category includes transitional residential, foster family homes and any facilities supervised by or under contract with the State Department of Corrections.

Retail.

Artisan Shop. A retail store selling art glass, ceramics, jewelry and other handcrafted items and supplies needed to create finished items, where the facility includes an area for the crafting of the items sold.

Convenience/Small Grocery Market. A small retail establishment (up to 10,000 square feet) that sells a range of everyday items, such as coffee, groceries, prepackaged food items, magazines, newspapers, and other household goods. The market may include a de licatessen or specialty food items and may cater to neighborhood or local clients or may be operated on the same parcel in conjunction with another use. Also known as a corner store or bodega.

Liquor sales are considered separate from the market.

Firearm Sales and Servicing. A business whose primary use is the sale and servicing of firearms, ammunition, and related materials.

General Retail Sales. The retail sale or rental of merchandise not specifically listed under another use classification. This classification includes retail establishments with 60,000 square feet or less of sales area; including bakeries, clothing stores, drug and discount stores, florists, gift shops, household stores, furniture stores, pharmacies, small hardware and garden supply/nurseries stores, sports stores, stationary and variety stores, and businesses retailing goods including, but not limited to, the following: art supplies, dry goods, toys, hobby materials, handcrafted items, jewelry, cameras, pet supplies, photographi c supplies and services (including portraiture and retail photo processing), medical supplies and equipment, musical instruments, electronic equipment, sporting and camping equipment, kitchen

Page 523 ends

Division V: Definitions
Woodland Comprehensive Zoning Code | V-43
utensils, hardware, appliances, antiques, art galleries, art sup plies and services, paint and wallpaper, carpeting and floor covering, office supplies, bicycles, video rental, new automotive parts and accessories (excluding vehicle service and installation). Retail sales may be combined with accessory indoor repair services.

Grocery Store. An establishment between 5,000 and 60,000 square feet of sales area, primarily engaged in the retail sale of canned food; dry goods; fresh fruits and vegetables; fresh meats, fish, and poultry; and any area that is not separately own ed within the store where the food is prepared and served, including a bakery, deli, and meat and seafood departments.

Large Format Retail Sales. Retail establishments with over 60,000 square feet of sales area that sell merchandise and bulk goods for indi vidual consumption, including department stores and membership warehouse clubs, where sales of grocery items do not occupy more than 25 percent of the floor area. Retail sales may be combined with accessory indoor repair services.

Liquor Sales as Primary U se. Establishments primarily engaged in selling packaged alcoholic beverages for off–site consumption.

Liquor Sales as Accessory Use, Small. Establishments up to 5,000 gross square feet in size where liquor sales represent no more than 20 percent of the total inventory sold.

Liquor Sales as Accessory Use, Large. Establishments greater than 5,000 gross square feet in size where liquor sales represent no more than 20 percent of the inventory sold.

Nursery and Garden Center. Establishments primarily engaged in retailing nursery and garden products—such as trees, shrubs, plants, seeds, bulbs, and sod that are predominantly grown elsewhere. Fertilizer and soil products are stored and sold in packaged form only.

Residential Limited Retail. Small neighborhood-oriented retail establishments in residential districts. Limited uses provide convenient, walkable access to convenience and/or specialty goods and services. Appropriate uses include the following: counter -service cafes and coffee shops; delicatessens; bakeries; flower shops; and bike shops and bike repair services.

Pawn Shop. Establishments engaged in the buying, selling, trading, accepting for auctioning, or auctioning of new or secondhand merchandise and offering loans in exchange for personal property.

Secondhand/Consignment Store. A store where secondhand goods are for sale or goods are placed on consignment, which is the act of placing goods in the hands of another, while still retaining ownership, until the goods are sold. Unlike a pawn shop, secondhand/ consignment stores do not offer loans in exchange for personal property.

Smoke Shop. Smoke shop shall mean any premises dedicated to the display, sale, distribution, delivery, offering, furnishing, or marketing of tobacco, tobacco products, or tobacco paraphernalia. Smoke shop includes tobacco stores and vape shops. Any grocery store, supermarket, convenience store or similar retail use that only sells conventional cigars, cigarettes or tobacco as an ancillary sale is not considered a smoke shop.

Roadside S tand. A temporary structure designed or used for the display or sale of agricultural products.

Page 524 ends

Division V: Definitions
V-44 | Woodland Comprehensive Zoning Code
Salvage and Wrecking Yard. Storage and dismantling of vehicles and equipment for sale of parts, as well as their collection, storage, exchange, or sale of goods including, but not limited to, any used building materials, used shipping containers or steel drums, used tires, and similar related articles or property.

SB 9 Project. See Section 17.84.380, Two-Unit Projects.

School. A facility for primary or secondary education, including public schools, charter schools, and private and parochial schools having curricula comparable to that required in the public schools of the State of California.

Single-Family. A dwelling unit that is designed for occupancy by one household with private yards on all sides and located on a separate lot from any other units (except an accessory dwelling unit) This classification includes individual manufactured housing units installed on a foundation syst em pursuant to the California Health and Safety Code § 18551.

Detached. A single -unit dwelling, on a single lot, within which all rooms are internally accessible and that is not attached to any other primary dwelling unit.

Attached. A dwelling unit that is designed for occupancy by one household located on a single parcel that does not contain any other unit (except an accessory dwelling unit) and is attached through common vertical walls to one other dwelling on an abutting parcel (also referred to as a half-plex).

Single-Room Occupancy. A residential facility where living accommodations are individual secure rooms, with or without separate kitchen or bathroom facilities for each room, rented to one - or two- person households on a weekly or monthly basis. This use classification is distinct f rom a Hotel or Motel, which is a commercial use.

Small Lot Subdivision. A residential subdivision in which there are attached or detached residential units, each owned fee -simple and located on lots less than t he minimum lot size and less than the minimum lot dimensions otherwise established for the underlying residential zones. Single family, duplex and multi-unit building types may be permitted within a small lot subdivision subject to Section

17.56.040, Small Lot Subdivision Design Standards . Configurations for small lot subdivisions may include but are not limited to cluster housing, cottage courts, drive courts, and townhouses/rowhouses. A maintenance agreement or homeowners association may govern common areas like driveways or open space. Reduced interior setbacks are typical.

Social Service Centers/Daytime Service Facility. Facilities providing a variety of supportive services for disabled and homeless individuals and other targeted groups on a less -than-24-hour basis.

Examples of services provided are counseling, meal programs, personal storage lockers, showers, instructional programs, television rooms, and meeting spaces. This classification is distinguished from licensed day care centers (See Day Care Center), clinics (see Clinic), and emergency shelters providing 24-hour or overnight care (See Emergency Shelter).

Storage Yard. The use of land to store material, equipment, or vehicles as an accessory to a primary use. The primary use must have an active business license within the City of Woodland. Does not include freight or truck trailer storage or impound lots.

Supportive Housing. Dwelling units with no limit on length of stay that are occupied by the target population as defined in the California Health and Safety Code § 53260(d) or individuals eligible for

Page 525 ends

Division V: Definitions
Woodland Comprehensive Zoning Code | V-45
services provided pursuant to the Lanterman Development Disabilities Act (Division 45 of the Welfare and Institutions Code), and that are linked to onsite or offsite services that assist supp ortive housing residents in retaining the housing, improving their health status, and maximizing their ability to live and, where possible, work in the community and where no onsite medical care is provided. Supportive housing as defined in the California Health and Safety Code § 50675.14(b) may be provided in a multiple-unit structure or group residential facility. Facilities may operate as licensed or unlicensed facilities subject to applicable State requirements.

Swap Market/Flea Market. An indoor or outdoor place, in an approved location, or for an approved activity where new or used goods or secondhand personal property is offered for sale or to exchange to the general public by a multitude of individual licensed vendors, usually in compartmentalized spaces. The term Swap Meet or Flea Market is interchangeable with auctions, open -air markets, or other similarly labeled activities, but the term does not include supermarket or department store retail operations.

Temporary Tract Office. A temporary sales office located on the site of a new development, usually in a model home, and operated until sales are completed.

Tire or Concrete Recycling/Storage. A facility to recycle or store tires, concrete, hazardous chemicals, or other industrial materials. This use does not include the processing of recycled materials into new materials.

Transitional Housing. Dwelling units configured as rental housing but operated under program requirements that require the termination of assistance and recirculating of the assisted unit to another eligible program recipient at a predetermined future point in time, that shall be not less than six months from the beginning of assistance. Transitional housing may be designated for homeless or recently homeless individuals or families transitioning to permanent housing as defined in the California Health and Safety Code § 50675.2(h). Facilities may be linked to onsite or offsite supportive services designed to help residents gain skills needed to live independently. Transitional housing may be provided in a variety of rental housing types (e.g., multiple -unit dwelling, single -room occupancy, group residential, single unit dwelling). This classification includes domestic violence s helters.

Transportation Passenger Facility. A facility for passenger transportation operations, including transit bus stops and bus terminals.

Vehicle Impound and Tow Yard. A lot, tow-yard, or in an interior space for the holding of equipment or vehicles l egally impounded until they are placed back in control of the owner, recycled for their metal, stripped of their parts at a wrecking yard, or auctioned off for the benefit of the impounding agency. The impounding agency can be a police department/agency.

Warehousing, Storage, Logistics and Distribution. Storage and distribution facilities without sales to the public on -site or direct public access except for public storage in small individual space exclusively and directly accessible to a specific tenant.

Chemical or Mineral Storage. Storage of hazardous materials including, but not limited to bottled gas, chemicals, minerals and ores, petroleum or petroleum-based fuels, and fireworks.

Indoor Warehousing and Storage. The receiving, storing and dist ribution of goods, including cold storage. Includes maintaining inventory and providing safekeeping for a product before sale, resale, or use. A building where goods or raw materials are stored. Includes unloading, receiving, and checking inbound goods. I ncludes storage and sale of materials and supplies

Page 526 ends

Division V: Definitions
V-46 | Woodland Comprehensive Zoning Code
used in production or operation, including janitorial and restaurant supplies. This use normally operates from a warehouse of office having little or no display of merchandise and is not designed to solici t walk-in-traffic. This classification does not include wholesale sale of building materials (see Building Material Sales and Services).

Logistics and Distribution. Includes the inbound and outbound flow of goods with a focus on freight-related transportation services that concentrate logistics and transportation activities.

Logistics centers participate in all activities linked to the supply chain. Fulfillment and distribution centers that may serve designated by companies to store products, prepare orders, and distribute products. May be a transfer center, distribution center or process distribution center. Typically larger in size, with specialized handling equipment, loading and docks.

Personal Storage Facility. A storage facility that is characterized by individual separate spaces accessible by customers for the storing and retrieval of personal effects and household goods.

This classification excludes workshops, warehousing, manufacturing, retail or wholesale selling, office or other business services with the spaces and human habitation.

Personal Storage Warehouse Facility. The indoor storage of large boats, RVs, and other large objects for customers for storage and retrieval. The items may be moved about within the facility by the business operator wit h goods and vehicles possibly arranged in racks for storage. This classification excludes workshops, commercial warehousing, manufacturing, retail or wholesale selling, office or other business services with the spaces and human habitation.

Wholesale Nursery. An establishment primarily engaged in the wholesale of nursery and garden products such as trees, shrubs, plants, seeds, bulbs, and sod that are predominantly grown elsewhere.

Fertilizer and soil products are stored and sold in packaged form only.

Page 527 ends

City of Woodland Zoning Code Update
Addendum Evaluation
State Clearinghouse # 2013032015
prepared by
City of Woodland
Planning Division
300 First Street
Woodland, California 95695
Contact: Erika Bumgardner, Deputy Community Development Director prepared with the assistance of
Rincon Consultants, Inc.
4825 J Street, Suite 200
Sacramento, California 95819
May 2024

Page 528 ends
Page 529 ends

Table of Contents

Addendum Evaluation i
Table of Contents
Acronyms and Abbreviations ................................................................................................................. iii 1 Introduction and Project Summary ................................................................................................ 1

1.1 Project Title ......................................................................................................................... 1

1.2 Lead Agency/Project Sponsor Name and Address .............................................................. 1

1.3 Contact Person and Phone Number ................................................................................... 1

1.4 Project Location .................................................................................................................. 1

1.5 Project Summary ................................................................................................................. 1

1.6 Discretionary Action ............................................................................................................ 4

1.7 Prior Environmental Document(s) ...................................................................................... 4

1.8 Location of Prior Environmental Document(s) ................................................................... 4 2 Project Context ............................................................................................................................... 5

2.1 City of Woodland General Plan ........................................................................................... 5

2.2 Woodland General Plan EIR ................................................................................................ 5

2.3 Zoning Code Update ........................................................................................................... 7 3 Overview of CEQA Guidelines Section 15162 and Section 15164 ................................................17 4 Environmental Effects and Determination ...................................................................................19

4.1 Environmental Areas Determined to Have New or Substantially More Severe Significant Effects Compared to Those Identified in the Previous EIR ..............................19

4.2 Determination ...................................................................................................................20 5 Addendum Evaluation Methodology ............................................................................................21

5.1 General Plan Consistency ..................................................................................................21

5.2 Preliminary Environmental Constraints ............................................................................22 6 Addendum Evaluation ..................................................................................................................23

6.1 Aesthetics ..........................................................................................................................23

6.2 Agriculture and Forestry ...................................................................................................24

6.3 Air Quality .........................................................................................................................26

6.4 Biological Resources ..........................................................................................................27

6.5 Cultural Resources ............................................................................................................29

6.6 Energy ...............................................................................................................................30

6.7 Geology and Soils ..............................................................................................................31

6.8 Greenhouse Gas Emissions ...............................................................................................33

6.9 Hazards and Hazardous Materials ....................................................................................34

6.10 Hydrology and Water Quality ...........................................................................................35

6.11 Land Use and Planning ......................................................................................................37

Page 530 ends

City of Woodland
City of Woodland Zoning Code Update

ii

6.12 Mineral Resources ............................................................................................................38

6.13 Noise .................................................................................................................................39

6.14 Population and Housing ....................................................................................................40

6.15 Public Services ...................................................................................................................41

6.16 Recreation .........................................................................................................................42

6.17 Transportation ..................................................................................................................43

6.18 Tribal Cultural Resources ..................................................................................................45

6.19 Utilities ..............................................................................................................................46

6.20 Wildfire..............................................................................................................................47 7 Conclusion.....................................................................................................................................49 8 References ....................................................................................................................................50

8.1 Bibliography ......................................................................................................................50

8.2 List of Preparers ................................................................................................................50 Tables
Table 1 Summary of Areas of Potential Impact under the General Plan EIR................................... 6 Table 2 Current and Proposed Zoning Code Updates ..................................................................... 8 Table 3 Current and Proposed Residential Density Updates .........................................................10 Table 4 Current and Proposed Buildout ........................................................................................15 Figures
Figure 1 Regional Project Location ................................................................................................... 2 Figure 2 All Rezoned Sites ................................................................................................................. 3 Figure 3 Sites with a Proposed Zoning Change Only ......................................................................11 Figure 4 Sites with a Proposed General Plan Amendment Only .....................................................12 Figure 5 Sites with a Proposed Zoning Change and General Plan Amendment .............................13

Page 531 ends

Acronyms and Abbreviations

Addendum Evaluation iii
Acronyms and Abbreviations
AMI Area Median Income
BMP best management practices
CAL FIRE California Department of Forestry and Fire Protection CEQA California Environmental Quality Act
EIR Environmental Impact Report
FAR floor-area ratio
FHSZ Fire Hazard Severity Zone
GHG greenhouse gas
LOS level of service
SB Senate Bill
SOI Sphere of Influence
VMT vehicle miles traveled

Page 532 ends

City of Woodland
City of Woodland Zoning Code Update

iv

This page intentionally left blank.

Page 533 ends

Introduction and Project Summary

Addendum Evaluation 1
1 Introduction and Project Summary

1.1 Project Title
City of Woodland Zoning Code Update

1.2 Lead Agency/Project Sponsor Name and Address
City of Woodland
Planning Division
300 First Street
Woodland, California 95695

1.3 Contact Person and Phone Number
Erika Bumgardner, Deputy Community Development Director 530-661-5886

1.4 Project Location
The City of Woodland is located in central Yolo County, approximately 72 miles east of the Pacific Ocean. The city of Davis is approximately 7 miles to the south, and the city of Sacramento is approximately 20 miles to the southeast. Woodland is considered part of the Sacramento metropolitan area. The city encompasses 15.3 square miles (9,792 acres). Much of the city is situated along California State Route 113 (SR 113) and is traversed by Interstate 5 (I-5) (City of Woodland 2019). The Zoning Code Update planning boundaries include all land within the Woodland city limits, as shown in Figure 1.

1.5 Project Summary
The project consists of a comprehensive update to the City of Woodland Zoning Code (herein referred to as “Zoning Code Update” or “project”). The project would bring the City’s Zoning Code into compliance with California Government Code Section 65860(a), which requires that a jurisdiction’s zoning ordinance be consistent with its General Plan and subsequent updates to its General Plan, and aims to streamline residential development while also encouraging infill development in accordance with the City’s Regional Housing Needs Allocation and General Plan 2035.Therefore, the City is proposing to amend its existing Zoning Code to ensure compatibility with its adopted General Plan (adopted May 2017) and to bring the Zoning Code into consistency with the adopted land use policies of the General Plan, State, and federal law. The City’s Zoning Code Update would establish a consistent process, promote high quality design, promote infill, mixed-use, and transit-oriented development in transportation priority areas (TPAs) and mixed-use overlay areas, and standardize development review. Figure 2 depicts all sites throughout the city that would be rezoned as a part of the Zoning Code Update and/or where a General Plan Amendment (GPA) is proposed.

Page 534 ends

City of Woodland
City of Woodland Zoning Code Update

2 Figure 1 Regional Project Location

Page 535 ends

Introduction and Project Summary

Addendum Evaluation 3
Figure 2 Proposed Site Rezones and/or General Plan Amendments

Page 536 ends

City of Woodland
City of Woodland Zoning Code Update

4 The City’s current Zoning Code is included as Title 17 of the Woodland Municipal Code and includes 42 chapters covering general development provisions, definitions, zone specific permitted uses and development standards, city wide standards and administrative procedures. The proposed Zoning Code Update reorganizes elements of the current code to follow a more logical sequence of development regulations and procedures. The code update generally follows a flow from introductory provisions to zone standards, city-wide standards, and finally administrative procedures and definitions. It is comprised of 5 divisions and each division is divided into sections and subsections. Within the divisions, sections generally follow a logical pattern, moving from more general to more specific provisions. Details of the proposed updates to the Zoning Code under the proposed project are further discussed below in Section 2.3.

This Addendum, therefore, analyzes the changes and potential impacts related to the adoption of Zoning Code Update. This Addendum is intended to demonstrate the consistency of the Zoning Code Update with the existing General Plan to comply with CEQA. The City’s 2035 General Plan underwent extensive environmental review in the form of an Environmental Impact Report (EIR), which was certified in 2017. The EIR for the Woodland General Plan is a comprehensive document and includes discussion of alternatives and growth-inducing impacts associated with urban development in the city at the time it was developed. This Addendum will compare the buildout of the proposed project with the Cumulative Scenario, or full-buildout scenario, presented in the General Plan EIR. In particular, and in line with Public Resources Code Section 21083.3, this Addendum assesses whether the Zoning Code Update, as a policy and programs document, includes impacts not addressed or previously analyzed in the General Plan EIR.

1.6 Discretionary Action
Implementation of the Zoning Code Update would require the following discretionary actions by the City of Woodland Planning Commission and/or City Council:
▪ Adoption of the updated Zoning Code (Title 17)
▪ Adoption of General Plan Amendments
▪ Adoption of this Addendum to the certified EIR

1.7 Prior Environmental Document(s)
City of Woodland, 2035 General Plan Environmental Impact Report (General Plan Update EIR). State Clearinghouse Number 2013032015, certified in May 2017.

1.8 Location of Prior Environmental Document(s)
City of Woodland, Planning Department Website:
https://www.cityofwoodland.gov/1000/Documents

Page 537 ends

Project Context

Addendum Evaluation 5
2 Project Context

2.1 City of Woodland General Plan
State law mandates that each city and county in California adopt "a comprehensive, long-term general plan,” for the physical development of its planning area. The Woodland General Plan planning area includes all lands within the city limits and Sphere of Influence (SOI). The purpose of the General Plan is to plan for important community issues such as new growth, housing needs, and environmental protection. Furthermore, the General Plan is used to project future demand for services such as sewer, water, roadways, parks, and emergency services.

The Woodland General Plan, adopted in May 2017, is a long-term document which identifies the community’s vision for the future and provides a framework that will guide decisions on growth, development, and conservation of open space and resources in a manner that is consistent with the quality of life desired by the city’s residents and businesses.

The General Plan policy document contains the goals and policies that will guide future decisions within the city and identifies action items (implementation measures) to ensure the vision and goals of the General Plan are carried out. The General Plan also contains a Land Use Map, which serves as a general guide to the distribution of land uses throughout the city.

State law requires that every General Plan, at a minimum, address certain subject categories (called "elements"), which include land use, circulation, housing, conservation, open space, noise, safety, and environmental justice. A General Plan may also address other subjects that are of importance to the community’s future, such as sustainability, community design, and public art. Woodland’s General Plan includes the following elements:
▪ Land Use, Community Design, and Historic
Preservation
▪ Transportation and Circulation
▪ Economic Development
▪ Public Facilities and Services
▪ Healthy Community
▪ Sustainability, Conservation, and Open
Space
▪ Safety
▪ Housing

2.2 Woodland General Plan EIR
The City of Woodland 2035 General Plan EIR (herein called the General Plan EIR) addressed the potential environmental effects of the planned buildout of Woodland through the approximately 20 year period between 2017 to 2035 and concluded that implementation of the General Plan would result in environmental impacts as detailed in Table 1.

Actions and policies were incorporated into the General Plan EIR to reduce potential impacts from project development under the General Plan.

Page 538 ends

City of Woodland
City of Woodland Zoning Code Update

6 Table 1 Summary of Areas of Potential Impact under the General Plan EIR Issue Area
Level of Significance
after Mitigation
Mitigation Proposed
in the General Plan EIR
Aesthetics Significant and Unavoidable Mitigation Measure 4.1-4 Agricultural Resources Significant and Unavoidable Mitigation Measure 4.2-1 and 4.2-3 Air Quality Significant and Unavoidable Mitigation Measure 4.3-1a, 4.3-1b, 4.3-2, 4.3-3a,

4.3-3b, 4.3-3c, and 4.3-3d
Biological Resources Less than Significant Mitigation Measures 4.4-1a, 4.4-1b, 4.4-2a, 4.4- 2b, 4.4-2c, 4.4-3a, 4.4-3b, 4.4-3c, 4.4-3d, 4.4-4a,
and 4.4-4b
Cultural Resources Significant and Unavoidable Mitigation Measures 4.6-1a, 4.6-1b, 4.6-1c, 4.6- 1d, and 4.6-2
Energy Less than Significant Mitigation Measure 4.5-1a, 4.5-1b, 4.5-1c, and

4.5-2
Geology and Soils Less than Significant Mitigation Measures 4.7-3a and 4.7-4 Greenhouse Gas Emissions Less than Significant Mitigation Measure 4.5-1a, 4.5-1b, 4.5-1c, and

4.5-2
Hazards and Hazardous Materials Less than Significant None required Hydrology and Water Quality Less than Significant Mitigation Measures 4.9-1, 4.9-2, and 4.9-3 Land Use and Planning Significant and Unavoidable No feasible mitigation.

Noise Significant and Unavoidable Mitigation Measures 4.11-1, 4.11-2a, 4.11-2b,

4.11-3a, and 4.11-3b
Population and Housing Significant and Unavoidable No feasible mitigation.

Public Services Less than Significant Mitigation Measure 4.12-5a Transportation and Traffic Less than Significant Mitigation Measures 4.13-1a, 4.13-1b, 4.13-1c,

4.13-2, 4.13-3a, and 4.13-3b
Utilities and Service Systems Less than Significant None required Tribal Cultural Resources Significant and Unavoidable Mitigation Measures 4.6-1a, 4.6-1b, 4.6-1c, 4.6- 1d, and 4.6-2
Source: City of Woodland 2016
General Plan Assumptions
The General Plan buildout analysis assumes an 18-year horizon to the year 2035. The General Plan will accommodate future growth in Woodland, including new businesses, expansion of existing businesses, and new residential uses. The body of the General Plan EIR does not assume that full buildout of the General Plan will occur. However, the Cumulative Scenario analysis section of the EIR analyzes full buildout of the General Plan.

The General Plan EIR analyzes the impacts of the 2035 General Plan and 2035 Climate Action Plan that could result from implementation on a programmatic level. As discussed on page 2-8 of the General Plan EIR, the General Plan plans for a total population of approximately 75,000 residents, 27,000 dwelling units, 45,340 local jobs, and 37.2 million nonresidential square feet at buildout.

However, for the purpose of this Addendum, the proposed project will be compared to the impacts of the full buildout of the 2035 General Plan as presented in Section 6 of the General Plan EIR. This is due to the assumption that the proposed project could include development beyond what was previously analyzed, as full buildout was not analyzed in the body of the General Plan EIR but was

Page 539 ends

Project Context

Addendum Evaluation 7
analyzed in Section 6, Cumulative Impacts. Thus, to capture the potential that all units under the proposed project would be built, the same assumption is prescribed to the buildout of the General Plan.

Under the Cumulative Scenario, or full buildout scenario utilizing mid-range values for the density and intensity of each land use, the General Plan would result in 15,290 new dwelling units, 40,220 new jobs, and would add on approximately 42,060 residents. Averaging the minimum and maximum values for non-residential development shown in Table 6-3 of the General Plan EIR, full buildout of the General Plan could result in approximately 55.0 million non-residential square feet.1 As shown in Table 4, the buildout of the sites undergoing a change as a result of the proposed project under existing conditions would result in an increase of 4,597 residential dwelling units and

12.7 million non-residential square feet, which when compared to the overall General Plan buildout is within the development projections of 15,920 new residential units and 55.0 million non- residential square feet discussed in the Cumulative Scenario analyzed in the EIR. Refer to Section

2.3, Zoning Code Update, for more information.

2.3 Zoning Code Update
The Zoning Code Update includes the following revisions and whether those revisions would require a zone change, general plan amendment (GPA) or both, as shown in Table 2, Figure 3, Figure 4 and Figure 5 below.

Page 540 ends

City of Woodland
City of Woodland Zoning Code Update

8 Table 2 Current and Proposed Zoning Code Updates
Site
Number 2035 General Plan Current Zoning
Proposed General
Plan Land Use Proposed Zoning Acreage
Zone Change or
General Plan Amendment
1 Public/Quasi Public (PQ) Open Space (OS) Regional Commercial (RC) Regional Commercial (RC) 15.01 GPA and Zone Change 2 Regional Commercial (RC) Regional Commercial (RC) Regional Commercial – Light Industrial Over (RC-IF)
Regional Commercial-Flex
(RC-F)

16.33 GPA and Zone Change
3 Industrial – Light Industrial
Flex Overlay (IN-IF)
Industrial – Light Industrial Flex
Overlay (I-LIF)
Industrial (IN) Industrial (IG) 328.14 GPA and Zone Change 4 Low Density Residential
(LD)
Duplex Zone (R-2) Medium Density Residential
(MD)
Residential Low-Medium
(R-LM)
175.92 GPA and Zone Change (In
prior GP R-LM) multiple
properties (studied as RM in
the DEIR)
5 Low Density Residential
(LD)
Multifamily Zone (RM) Medium Density Residential
(MD)
Residential Medium (RM) 14.57 GPA Only
6 Low Density Residential
(LD)
Duplex Zone (R-2)
Single Family Zone (R-1)
Multifamily Zone (RM)
Medium Density Residential
(MD)
Residential Medium (RM) 13.08 GPA and Zone Change (RM
in the DEIR)
7 Low Density Residential
(LD)
Multifamily Zone (RM) Medium Density Residential
(MD)
Residential Medium (RM) 16.74 GPA Only
8 Medium Density
Residential (MD)
Duplex Zone (R-2) Medium Density Residential
(MD)
Residential Medium (RM) 2.52 Zone Change Only
9 Medium Density
Residential (MD)
Single Family Zone (R-1) Medium Density Residential
(MD)
Residential Medium (RM) 2.18 Zone Change Only
10 Medium Density
Residential (MD)
Duplex Zone (R-2) Medium Density Residential
(MD)
Residential Medium (RM) 4.06 Zone Change Only
11 Low Density Residential
(LD)
Duplex Zone (R-2) Low Density Residential (LD) Residential Low (RL) 12.50 Zone Change Only 12 Low Density Residential
(LD)
Duplex Zone (R-2) Medium Density Residential
(MD)
Residential Low-Medium
(R-LM)

3.70 GPA and Zone Change
(Studied as RL in the DEIR)
13 Low Density Residential
(LD)
Multifamily Zone (RM) Medium Density Residential
(MD)
Residential Medium (RM) 3.61 GPA Only
14 Low Density Residential
(LD)
Multifamily Zone (RM) Medium Density Residential
(MD)
Residential Medium (RM) 16.76 GPA Change (Studied as RM in the DEIR)
15 Community Commercial
(CC)
Community Commercial (CC) Corridor Mixed Use (CMU) Corridor Mixed Use – West Main (CMU-WM)

30.25 GPA and Zone Change –
multiple parcels (Studied as
CC in the DEIR)

Page 541 ends

Project Context

Addendum Evaluation 9
Site
Number 2035 General Plan Current Zoning
Proposed General
Plan Land Use Proposed Zoning Acreage
Zone Change or
General Plan Amendment
16 Downtown Mixed Use
(DMU)
DMU Downtown Mixed Use (DMU) Downtown Core (DX-1)
Downtown Civic (DX-2)
Downtown Transitional
(DX-3)
Downtown Gateway (DX-4)
151.04 Zone Change Only
17 Corridor Mixed Use (CMU) CMU-East Corridor Mixed Use (CMU) CMU- Armfield 32.07 Zone Change Only 18 Low Density Residential
(LD)
Multifamily Zone (RM) Medium Density Residential
(MD)
Residential Medium (RM) 2.51 GPA Only
19 Medium Density
Residential (MD)
Duplex Zone (R-2) Medium Density Residential
(MD)
Residential Medium (RM) 1.79 Zone Change Only
20 Low Density Residential
(LD)
Neighborhood Preservation (NP) Medium Density Residential (MD)
Residential Medium (RM) 10.28 GPA and Zone Change
(Studied as RL on north side
of Cross and RM south of
Cross in the DEIR)
21 Downtown Mixed Use
(DMU)
DMU Corridor Mixed Use (CMU) Corridor Mixed Use – East
(CMU-E)

32.98 GPA and Zone Change
22 Medium Density
Residential (MD)
Duplex Zone (R-2) Medium Density Residential
(MD)
Residential Medium (RM) 3.07 Zone Change Only
23 Medium Density
Residential (MD)
Duplex Zone (R-2) Medium Density Residential
(MD)
Residential Medium (RM) 2.25 Zone Change Only
24 Medium Density
Residential (MD)
Duplex Zone (R-2) Medium Density Residential
(MD)
Residential Medium (RM) 5.64 Zone Change Only
25 Low Density Residential
(LD)
Duplex Zone (R-2) Medium Density Residential
(MD)
Residential Low-Medium
(R-LM)

10.93 GPA and Zone Change
26 Low Density Residential
(LD)
Duplex Zone (R-2) Medium Density Residential
(MD)
Residential Low-Medium
(R-LM)

21.33 GPA and Zone Change
27 Medium Density
Residential (MD)
Duplex Zone (R-2) Medium Density Residential
(MD)
Residential Medium (RM) 1.56 Zone Change Only
28 Medium Density
Residential (MD)
Duplex Zone (R-2) Medium Density Residential
(MD)
Residential Medium (RM) 3.71 Zone Change Only
29 Medium Density
Residential (MD)
Single Family Zone (R-1) Medium Density Residential
(MD)
Residential Medium (RM) 4.93 Zone Change Only
Source: City of Woodland 2023

Page 542 ends

City of Woodland
City of Woodland Zoning Code Update

10 Finally, Table 3 shows all updates to residential zone names and densities:

Table 3 Current and Proposed Residential Density Updates Current Residential Zone Name
Current
Residential Zone Density
Proposed
Residential Zone Name
Proposed
Residential Density
Single Family (R-1) 1-8 du/ac Residential Low (R-L) 1-8 du/ac Neighborhood Preservation (NP) 1-8 du/ac Neighborhood
Preservation (NP)
1-8 du/ac
Duplex Residential (R-2) 1-8 du/ac Residential Low-Medium (R-LM)
5-15 du/ac
Multi-Family (RM) 8.1-19.9 du/ac Residential Medium (R- M)

8.1-19.9 du/ac
High Density Residential (RH) 20-40 du/ac Residential High (R-H) 20-40 du/ac Corridor Mixed Use (CMU) 20-40 du/ac Corridor Mixed Use – West Main (CMU-WM)
Corridor Mixed Use –
East (CMU-E)
Corridor Mixed Use –
Kentucky (CMU-K)
Corridor Mixed Use –
Armfield (CMU-A)
Corridor Mixed Use – Flex
(CMU-F)
20-40 du/ac

Community Commercial (CC) – Community Commercial
Mixed Use (CCMU)
15-35 du/ac
Neighborhood Commercial (NC) Unlimited – only allowed
on upper floors
Neighborhood Mixed Use
(NMU)
Unlimited – only allowed
on upper floors
Downtown Mixed Use Unlimited – 40 du/ac
assumed average
Downtown Core (DX-1)
Downtown Civic (DX-2)
Downtown Transitional
(DX-3)
Downtown Gateway
(DX-4)
Unlimited – 40 du/ac
assumed average
Source: City of Woodland 2023
In addition to all residential modifications, the City proposes to add two new zones, Corridor Mixed- Use Gateway (CMU-G) and Business Park (BP). These two zones would generally align with the City’s 2035 General Plan land use categories of Corridor Mixed Use (CMU) and Business Park (BP). The Business Park land use designation and proposed zone allows for a residential density range of 25 to 45 dwelling units per acres. All subzones under the CMU zoning district have an allowed residential density of 20 to 40 dwelling units per acre, with the exception of the new CMU-G, which would have a density of 15 to 45 dwelling units per acre. Because this both decreases and increases the allowable density, it is assumed that this would result in the same average density as that assumed by the General Plan, and therefore would not change the buildout assumptions for the CMU land use designation. Both of these zones are currently “floating,” as they are included in the 2035 General Plan Land Use Map, but these land uses currently do not apply to any land in the city. Any proposed zone changes would undergo separate CEQA evaluation.

Page 543 ends

Project Context

Addendum Evaluation 11
Figure 3 Sites with a Proposed Zoning Change Only

Page 544 ends

City of Woodland
City of Woodland Zoning Code Update

12 Figure 4 Sites with a Proposed General Plan Amendment Only

Page 545 ends

Project Context

Addendum Evaluation 13
Figure 5 Sites with a Proposed Zoning Change and General Plan Amendment

Page 546 ends

City of Woodland
City of Woodland Zoning Code Update

14 Additional modifications to the zoning code include:
▪ Revisions to the zone classifications table to match the General Plan, including zoning district names, symbols, minimum and maximum density and nonresidential intensity standards, and land use designations.
▪ The addition of new zoning districts including:
 Residential Low-Medium (R-LM)
 Downtown-Core (DX-1)
 Downtown-Civic (DX-2)
 Downtown-Transitional (DX-3)
 Downtown-Gateway (DX-4)
 Corridor Mixed Use – Armfield (CMU-A)
 Corridor Mixed-Use Gateway (CMU-G)
 Business Park (BP)
 Public Facilities (PF)
As shown in Table 4 below, there would be a net increase of 4,597 dwelling units and 12.7 million non-residential square feet associated with the proposed project. This would bring the buildout of the 2035 General Plan with the proposed project on sites that would undergo a change associated with the proposed project to 12,447 residential dwelling units and 27.9 million non-residential square feet.

The General Plan EIR evaluated new growth areas and assumed a total of 7,000 new residential units within the city. This assumption includes development throughout the city. The net increase in residential units associated with the proposed project (4,597 units) and the new units assumed across all other sites in the city (7,000 units) would result in 11,610 new residential units. This would not exceed the Cumulative Scenario buildout previously analyzed in the General Plan EIR (15,290 units).

Additionally, the General Plan evaluated non-residential growth through two scenarios in the General Plan EIR throughout the City. The net increase in non-residential square footage associated with the proposed project (12,691,423 sf) and the non-residential square footage associated General Plan buildout within the city as analyzed in the General Plan EIR (17,386,000 square feet under the East Alternative, which has the highest non-residential square footage assumptions) would result in 30,077,423 square feet. This would not exceed the Cumulative Scenario buildout analyzed in the General Plan EIR (35,129,000 square feet).

Therefore, the proposed project would fall within the buildout numbers (i.e., 15,290 new dwelling units and 55 million non-residential square feet) previously analyzed in the General Plan EIR.

Page 547 ends

Project Context

Addendum Evaluation 15
Table 4 Current and Proposed Buildout
Site
Number
2035 General Plan
Residential Units
(Cumulative Assumption)
2035 General Plan
Non-Residential FAR (sq. ft.)
(Cumulative Assumption)
Proposed
Residential Units
Resulting from Zoning
and/or General Plan
Amendments
Proposed Non-
Residential FAR (sq. ft.)
Resulting from Zoning
and/or General Plan
Amendments
Buildout Residential
Units Difference
Buildout Non-Residential
FAR (sq. ft.) Difference
1 0 163,350 0 457,815.6 0 294,465.6
2 0 249,163.2 0 497,890.8 0 248,727.6
3 0 5,717,685.6 0 11,434,935.6 0 5,717,250
4 879.6 0 2,638.8 0 1,759 0
5 72.85 0 72.85 0 0 0
6 65.40 0 260.29 0 195 0
7 83.70 0 333.13 0 249 0
8 35.28 0 35.28 0 0 0
9 30.52 0 30.52 0 0 0
10 56.84 0 56.84 0 0 0
11 62.50 0 62.50 0 0 0
12 18.50 0 55.50 0 37 0
13 18.05 0 71.84 0 54 0
14 83.80 0 333.52 0 250 0
15 0 395,307 1,210.00 3,953,070 1,210 3,557,763
16 4,531.20 6,579,302.40 4,531.20 6,579,302.4 0 0
17 448.98 698,484.60 448.98 698,484.6 0 0
18 12.55 0 49.95 0 37 0
19 25.06 0 25.06 0 0 0
20 51.4 0 204.58 0 153 0
21 989.40 1,436,608.80 1,319.20 4,309,826.40 330 2,873,217.60 22 42.98 0 42.98 0 0 0
23 31.50 0 31.50 0 0 0
24 78.96 0 78.96 0 0 0
25 54.65 0 163.95 0 109 0
26 106.65 0 319.95 0 213 0
27 21.84 0 21.84 0 0 0
28 51.94 0 51.94 0 0 0
29 69.02 0 69.02 0 0 0

Page 548 ends

City of Woodland
City of Woodland Zoning Code Update

16 Site
Number
2035 General Plan
Residential Units
(Cumulative Assumption)
2035 General Plan
Non-Residential FAR (sq. ft.)
(Cumulative Assumption)
Proposed
Residential Units
Resulting from Zoning
and/or General Plan
Amendments
Proposed Non-
Residential FAR (sq. ft.)
Resulting from Zoning
and/or General Plan
Amendments
Buildout Residential
Units Difference
Buildout Non-Residential
FAR (sq. ft.) Difference
Total 7,923.17 15,239,902 12,447 27,931,325.4 4,597 12,691,423.80 Note: These numbers were calculated using the existing mid-range densities for each site (consistent with the calculation methodology in the 2035 General Plan EIR for the Cumulative Scenario) and the acreages on the sites being analyzed.

Calculations are based on sites with General Plan land use designation changes, as sites undergoing a zone change to bring them into alignment with their land use designation (and therefore not undergoing a change from the General Plan designation) are assumed to have no change from the General Plan 2035 assumptions.

Source: City of Woodland 2023

Page 549 ends

Overview of CEQA Guidelines Section 15162 and Section 15164

Addendum Evaluation 17
3 Overview of CEQA Guidelines Section
15162 and Section 15164
CEQA Guidelines Sections 15162 and 15164 set forth the criteria for determining the appropriate additional environmental documentation, if any, to be completed when a project has a previously certified EIR.

CEQA Guidelines Section 15164 states that a lead agency shall prepare an addendum to a previously certified EIR if some changes or additions are necessary. None of the conditions described in Section 15162 calling for preparation of a subsequent EIR have occurred. CEQA Guidelines Section 15162(a) states that no Subsequent or Supplemental EIR shall be prepared for a project with a certified EIR unless the lead agency determines, based on substantial evidence in the light of the whole record, one or more of the following:

1. Substantial changes are proposed in the project that will require major revisions of the previous EIR due to the involvement of new significant environmental effects or a substantial increase in the severity of previously identified significant effects.

2. Substantial changes occur with respect to the circumstances under which the project is undertaken which will require major revisions of the previous EIR due to the involvement of new significant environmental effects or a substantial increase in the severity of previously identified significant effects.

3. New information of substantial importance, which was not known and could not have been known with the exercise of reasonable diligence at the time the previous EIR was certified as complete, shows any of the following:

A. The project will have one or more significant effects not discussed in the previous EIR.

B. Significant effects previously examined will be substantially more severe than shown in the previous EIR.

C. Mitigation measures or alternatives previously found not to be feasible would in fact be feasible and would substantially reduce one or more significant effects of the project, but the project proponents decline to adopt the mitigation measure or alternative.

D. Mitigation measures or alternatives that are considerably different from those analyzed in the previous EIR would substantially reduce one or more significant effects on the environment, but the project proponents decline to adopt the mitigation measure or alternative.

The analysis pursuant to CEQA Guidelines Section 15162 demonstrates whether the lead agency can approve the activity as being within the scope of the existing certified EIR, that an addendum to the existing EIR would be appropriate, and no new environmental document, such as a new EIR, would be required. The addendum need not be circulated for public review but can be included in or attached to the Final EIR, and the decision-making body shall consider the addendum with the Final EIR prior to deciding on the project.

The City has prepared this Addendum Evaluation, pursuant to CEQA Guidelines Sections 15162 and 15164, to evaluate whether the project’s environmental impacts are covered by and within the scope of the City of Woodland 2035 General Plan Final EIR (certified May 2017, State Clearinghouse Number 2013032015). The following Addendum Evaluation details any changes in the project,

Page 550 ends

City of Woodland
City of Woodland Zoning Code Update

18 changes in circumstances under which the project is undertaken, and/or "new information of substantial importance" that may cause one or more effects to environmental resources.

The responses herein substantiate and support the City’s determination that the proposed Zoning Code Update and associated policies and programs are within the scope of the General Plan EIR, do not require subsequent action under CEQA Guidelines Section 15162 and, in conjunction with the EIR, adequately analyze potential environmental impacts.

Page 551 ends

Environmental Effects and Determination

Addendum Evaluation 19
4 Environmental Effects and Determination

4.1 Environmental Areas Determined to Have New or
Substantially More Severe Significant Effects
Compared to Those Identified in the Previous EIR
The subject areas checked below were determined to be new significant environmental effects or to be previously identified effects that have a substantial increase in severity either due to a change in project, change in circumstances, or new information of substantial importance, as indicated by the checklist and discussion on the following pages.
■ NONE
□ Aesthetics □ Agriculture and
Forestry Resources
□ Air Quality
□ Biological Resources □ Cultural Resources □ Energy
□ Geology and Soils □ Greenhouse Gas
Emissions
□ Hazards and Hazardous
Materials
□ Hydrology and Water
Quality
□ Land Use and Planning □ Mineral Resources
□ Noise □ Population and
Housing
□ Public Services
□ Recreation □ Transportation □ Tribal Cultural Resources □ Utilities and Service
Systems
□ Wildfire □ Mandatory Findings
of Significance

Page 552 ends

City of Woodland
City of Woodland Zoning Code Update

20 4.2 Determination
Based on this analysis:
□ Substantial changes are proposed in the project or there are substantial changes in the circumstances under which the project will be undertaken that will require major revisions to the previous EIR due to the involvement of significant new environmental effects or a substantial increase in the severity of previously identified significant effects. Or, there is "new information of substantial importance," as that term is used in CEQA Guidelines Section 15162(a)(3). Therefore, a SUBSEQUENT or SUPPLEMENTAL EIR is required. ■ No substantial changes are proposed in the project and there are no substantial changes in the circumstances under which the project will be undertaken that will require major revisions to the previous EIR due to the involvement of significant new environmental effects or a substantial increase in the severity of previously identified significant effects.

Also, there is no "new information of substantial importance" as that term is used in CEQA Guidelines Section 15162(a)(3). Therefore, the previously certified EIR is adequate and this evaluation serves as an ADDENDUM to the 2035 General Plan Final Environmental Impact Report (General Plan FEIR). State Clearinghouse Number 2013032015 dated May 2017.

Signature Date

Printed Name Title

Page 553 ends

Addendum Evaluation Methodology

Addendum Evaluation 21
5 Addendum Evaluation Methodology

5.1 General Plan Consistency
To promote a uniform and compatible vision for the development of the community, California law requires the General Plan be internally consistent in its goals and policies. A jurisdiction’s zoning ordinance must be consistent with its General Plan and subsequent updates to its General Plan.

General Plan elements and policies that may affect land use are summarized below:
▪ The Land Use, Community Design, and Historic Preservation Element directs the location and form of future development, shaping where people will live, work, play, and shop in Woodland. It presents the desirable pattern for the ultimate development of the city for the General Plan horizon (year 2035) and seeks to ensure that land use planning reflects the community’s evolution and changing demographics, while promoting sustainability. Goals and policies related to urban form and design will inform development decisions by providing a common understanding of the characteristics the community wishes to achieve and preserve. ▪ The Transportation and Circulation Element emphasizes the development of new and modified infrastructure that promotes increased transportation choices to serve existing and new development. Specifically, it promotes an integrated, multimodal transportation system to reduce air pollution and greenhouse gas (GHG) emissions, reduce the need for costly roadway improvements, and allow residents and business the opportunity to operate, recreate and move through the city efficiently without an automobile whenever possible. In addition, streets, roads, and other thoroughfares represent the public face of the city and provide an opportunity to improve its beauty, convenience, and safety.
▪ The Economic Development Element of the General Plan contains goals and policies that will enable the City to direct local resources to retain, relocate, expand, and assist local businesses and attract new industries that will increase the City’s tax base and economic diversity. This Element provides policy direction for fostering development and revitalization to support a vibrant downtown; promoting growth in key target areas; providing jobs for the growing population; creating opportunities for supply of retail goods and services that will be needed by the community and patronized by regional travelers as well as business to business opportunities; and enhancing the City’s ability to provide public services for current and future residents. ▪ The purpose of the Public Facilities and Services Element is to provide a policy framework for the City to manage infrastructure and services, identify areas for improvement, and ensure that public utilities and services meet the needs of the community as the city grows. More specifically, the Public Facilities and Services Element addresses the planning, provision, and maintenance of police and fire services; parks and recreational facilities and programs; schools; water, recycled water, wastewater, drainage/stormwater, solid waste systems; and other public facilities. ▪ The Healthy Community Element is centered on the concept that the health of the community is a direct reflection of the health of the residents living within the community. The Element reviews current health conditions in Woodland and sets forth goals and policies to promote the individual and collective health of those living in Woodland, particularly pertaining to access to medical and health services and facilities, active lifestyles, healthy food, community services, and arts and culture.

Page 554 ends

City of Woodland
City of Woodland Zoning Code Update

22 ▪ The Sustainability, Conservation, and Open Space Element establishes goals and policies for the conservation of natural resources in Woodland. Woodland’s natural resources – water, natural habitats, wildlife, vegetation, agricultural soils, minerals, and air – contribute to the city’s economy and the quality of life of Woodland residents.
▪ The purpose of the Safety Element is to identify the natural and manmade public safety hazards that exist within the city and to establish preventative and responsive policies and programs to mitigate their potential impacts.
▪ The goals of the Housing Element are to identify the community’s housing needs; to state the community’s goals and objectives with regard to housing production, rehabilitation, and conservation to meet those needs; and to define the policies and programs that the community will implement to achieve the stated goals and objectives.

5.2 Preliminary Environmental Constraints
The Zoning Code Update, in and of itself, does not propose specific development projects, but rather codifies zoning rules, processes, and procedures that guide future growth in Woodland. Each future development project would be subject to separate review to determine potential impacts on the environment related to each project as potential impacts are location-specific and cannot be assessed in a meaningful way until a project site and development proposal are identified. When a specific development proposal is considered for approval, that project would be subject to adopted development guidelines and standards outlined in the Zoning Code and be required to incorporate applicable mitigation measures, alternatives and/or uniformly applied policies developed in the 2035 General Plan EIR certified in 2017 (in accordance with CEQA Guidelines Section 15168[c][3]). If a subsequent activity (in this case a specific development proposal that requires discretionary approval) would have effects not identified in the program EIR (the 2035 General Plan EIR and this Addendum), the lead agency must prepare additional CEQA documentation.

This Addendum evaluation includes the analysis of the changes and potential impacts related to the adoption of the Zoning Code Update. This Addendum evaluation is intended to demonstrate the project’s consistency with the existing Woodland 2035 General Plan and Final EIR to satisfy the requirements of CEQA. In particular, and pursuant to Public Resources Code Section 21083.3, this Addendum Evaluation assesses whether the updated Zoning Code, as a policy and programs document, includes impacts not addressed or analyzed as significant effects in the certified EIR.

Page 555 ends

Addendum Evaluation

Addendum Evaluation 23
6 Addendum Evaluation

6.1 Aesthetics
General Plan EIR Findings
The General Plan EIR determined the Cumulative Scenario would result in a less than significant impact to scenic vistas. There are no State scenic highways in close proximity to the City. Therefore, impacts to State scenic highways would be less than significant. Future development would be required to be consistent with existing adopted General Plan policies that protect the scenic resources of the City of Woodland. Implementation of the Cumulative Scenario would add uses and density; new investment in urban infill areas typically improves visual quality by developing vacant or underutilized properties and improving maintenance of existing structures and yards. Nonetheless, the Cumulative Scenario would change the visual character of the city, which would be perceived within the city, as well as from adjacent areas. Therefore, implementation of the General Plan Cumulative Scenario would result in significant and unavoidable impacts to visual character. The General Plan EIR determined that the Cumulative Scenario would also contribute to an increase in nighttime light and glare. Mitigation Measure 4.1-4 recommends two additional policies, Policies 2.F.4 and 2.F.5, that require light sources to be aimed downward and shielded, as necessary, to prevent glare or reflection or any nuisance or hazardous interference of any kind on adjoining streets or property and to avoid glare by using exclusively low-reflectance, non-polished finishes, or other equally effective mechanisms. Mitigation Measure 4.1-4 will reduce light and glare from urban development, but these impacts cannot be avoided altogether. This impact would be significant and unavoidable.

Addendum Analysis
The proposed project would update the Zoning Code for consistency with the 2035 General Plan in addition to implementing several GPAs. The zone changes would have no impact on the total residential or non-residential buildout analyzed in the Cumulative Impacts section of the General Plan EIR, as they are intended to bring the zone changes in line with the General Plan. However, the various GPAs would lead to an increase in the total number of residential units and non-residential square footage in the city. This total would still be within the Cumulative Buildout totals that were previously analyzed in the General Plan EIR. The proposed project would update but not eliminate the fundamental regulations and requirements of the Zoning Code, such as meeting design standards and use regulations. Policies and actions in the 2035 General Plan that were referenced in the General Plan EIR, Policy 2.E.5 in the General Plan which protects view corridors, as well as Mitigation Measure 4.1-4, would reduce impacts to the greatest extent possible. These policies and actions would continue to be required with implementation of the Zoning Code Update.

Furthermore, development and design standards within the updated Zoning Code, including new objective design standards (Zoning Code Division II, Chapter 17.56 – Building and Site Design Standards) and development regulations pertaining to building height, setbacks and lot coverage (Zoning Code Division II – Zone Regulations) further implement General Plan goals and policies that speak to the preservation of view corridors, attractive building street facades and preservation of existing neighborhood character (General Plan Goal 2.G and Policies 2.E.5-6, and 2.G1-3). In line with General Plan EIR Mitigation Measure 4.1-4, Zoning Code Section 17.76.080, regulates Light and Glare associated with new development proposals, specifically stating that, “Lights shall be of the minimum illumination

Page 556 ends

City of Woodland
City of Woodland Zoning Code Update

24 necessary for a given application and shall be placed to deflect light away from adjacent properties and public streets, and to prevent adverse interference with the normal operation or enjoyment of surrounding properties. Lights shall be directed downward and shielded at lot lines so as to confine all direct rays to the premises on which it is located. Exterior lighting shall be fully shielded;” and, “All lighting, reflective surfaces, mechanical or chemical processes, or any other sources of illumination shall be designed and located in a manner that produces no glare visible on public streets or on any other parcel. Glare or heat reflected from building materials shall be mitigated so as to not disrupt surrounding properties.”
While the proposed project would be updating both the Zoning Code and the 2035 General Plan, the new buildout of all sites undergoing a change would fall within the buildout numbers that were previously analyzed, thereby resulting in the same visual impacts from new development, including potential light sources, as evaluated in the certified EIR. In addition, the proposed project would not result in increased density or more development than was envisioned in the 2035 General Plan Cumulative Scenario.

The Zoning Code Update, in and of itself, does not propose specific projects but aligns the zoning code to match the 2035 General Plan and proposed GPAs. Because it is a regulatory update, the Zoning Code Update would not, in and of itself, result in impacts to scenic vistas, scenic resources, or visual character, and would not create new sources of substantial light or glare which adversely affects views.

Future development facilitated by the Zoning Code Update would undergo project-specific developmental review, including design review, and would be subject to adopted development regulations, including standards that govern visual quality and community design.

Conclusion
The Zoning Code Update would not result in impacts beyond those addressed or analyzed in the General Plan EIR nor present new information that shows impacts would be more significant than those described in the General Plan EIR. Therefore, the General Plan EIR applies to the Zoning Code Update and no additional environmental assessment of aesthetics is required.

6.2 Agriculture and Forestry
General Plan EIR Findings
The General Plan EIR determined that implementation of the Cumulative Scenario would convert all of the farmland in the city to nonagricultural uses. Multiple policies are identified in the 2035 General Plan to manage agricultural land conversion, including an urban limit line that is designed to protect agricultural land surrounding the city limits, which would reduce the potential impact associated with conversion of agricultural land. The 2035 General Plan also requires mitigation for lost farmland within the Urban Limit Line (ULL) at a rate of one acre of permanently conserved farmland for every acre converted to urban development or nonagricultural uses. There would be no feasible mitigation that would allow the City to implement the 2035 General Plan according to the City’s Vision and Guiding Principles, while also avoiding the conversion of farmland. The loss of farmland associated with the Cumulative Scenario would result in a significant and unavoidable impact. The City has no farmland under Williamson Act contract. Therefore, the impacts of the Cumulative Scenario on existing zoning and Williamson Act contracts would be less than significant.

Page 557 ends

Addendum Evaluation

Addendum Evaluation 25
Addendum Analysis
The proposed project would update the Zoning Code for consistency with the 2035 General Plan in addition to implementing several GPAs. The zone changes would have no impact on the total residential or non-residential buildout analyzed in the Cumulative Impacts section of the General Plan EIR, as they are intended to bring the zone changes in line with the General Plan. However, the various GPAs would lead to an increase in the total number of residential units and non-residential square footage in the city. This total would still be within the Cumulative Buildout totals that were previously analyzed in the General Plan EIR. The proposed project would update but not eliminate the fundamental regulations and requirements of the Zoning Code, such as meeting design standards. Policies and actions in the 2035 General Plan that were referenced in the General Plan EIR would reduce impacts to the greatest extent possible. These policies and actions would continue to be required with implementation of the Zoning Code Update.

While the proposed project would be updating both the Zoning Code and the 2035 General Plan, the new buildout of all sites undergoing a change would fall within the buildout numbers that were previously analyzed, thereby resulting in the same agricultural and forestry impacts from new development, including farmland conversion, as evaluated in the certified EIR. In addition, the proposed project would not result in increased density or more development than was envisioned in the General Plan. Furthermore, the proposed project would be consistent with General Plan Goal 7.C. and Policies

7.C.5, 2.A.1, and 2.A.3 which preserves farmland, existing agricultural land uses, and implements an urban limit line to limit development on agricultural land within Woodland. The project would also comply with the Woodland Municipal Code Chapter 15.33 which implements mitigation measures to preserve agricultural land within the city. Woodland’s Right to Farm Ordinance (WMC Chapter 9.52) would also be applicable and the project would comply with this ordinance to reduce impacts to agricultural lands.

The Zoning Code Update, in and of itself, does not propose specific projects but aligns the zoning code to match the 2035 General Plan and proposed GPAs. Because it is a regulatory update, the Zoning Code Update would not, in and of itself, result in impacts to Farmland, Williamson Act contracts, or existing zoning for forest land or timberland.

Future development facilitated by the Zoning Code Update would undergo project-specific developmental review, including design review, and would be subject to adopted development standards including those listed in WMC Section 15.33 which generally requires that for every acre converted to urban development, one acre of mitigation shall be required (1:1 ratio) whenever the City Council approves a General Plan amendment and/or rezone for urban development on agricultural land or farmland.

Conclusion
The Zoning Code Update would not result in impacts beyond those addressed or analyzed in the General Plan EIR nor present new information that shows impacts would be more significant than those described in the General Plan EIR. Therefore, the General Plan EIR applies to the Zoning Code Update and no additional environmental assessment of agriculture and forestry is required.

Page 558 ends

City of Woodland
City of Woodland Zoning Code Update

26 6.3 Air Quality
General Plan EIR Findings
The General Plan EIR determined that construction-related criteria pollutant and precursor emissions from the 2035 General Plan would exceed YSAQMD’s thresholds of significance for ROG, NOX, and PM10. The Cumulative Scenario of the 2035 General Plan would involve more construction activities and would also generate construction-related criteria air pollutant and precursor emissions that exceed YSAQMD’s thresholds of significance. Implementation of Mitigation Measure 4.3-1a and Mitigation Measure 4.3-1b would aid in reducing construction emissions, but impacts would be significant and unavoidable. The General Plan EIR also determined that the Cumulative Scenario would exceed YSAQMD’s operational thresholds and would result in a significant and unavoidable impact after implementation of Mitigation Measure 4.3-1b and Mitigation Measure 4.3-2.

Implementation of the Cumulative Scenario of the 2035 General Plan could result in the creation of toxic air contaminants (TACs). However, 2035 General Plan policies aim to reduce impacts to air quality.

Compliance with all applicable air quality policies in the 2035 General Plan and regulations set by the Air Resources Board (ARB) would result in a less than significant impact from TACs with incorporation of Mitigation Measures 4.3-3a and 4.3-3b. Odor impacts are generally localized and do not combine with odor impacts in nearby jurisdictions to increase the severity of impacts. Because odor emissions from various land uses differ in nature, these emissions would not cumulatively contribute to each other to expose residents. The primary source of odor in the city is the Water Pollution Control Facility (WPCF).

Policy 7.F.6 of the 2035 General Plan requires odors associated with the wastewater treatment plant to be mitigated to acceptable levels in conjunction with planning and development for any land within an odor buffer. A study conducted by Nexgen (2015) found that outside of this buffer zone, there would be no substantial odor emissions. This impact would be less than significant without mitigation incorporated.

Addendum Analysis
The proposed project would update the Zoning Code for consistency with the 2035 General Plan in addition to implementing several GPAs. The zone changes would have no impact on the total residential or non-residential buildout analyzed in the Cumulative Impacts section of the General Plan EIR, as they are intended to bring the zone changes in line with the General Plan. However, the various GPAs would lead to an increase in the total number of residential units and non-residential square footage in the city. This total would still be within the Cumulative Buildout totals that were previously analyzed in the General Plan EIR. The proposed project would update but not eliminate the fundamental regulations and requirements of the Zoning Code, such as meeting design standards. Policies and actions in the 2035 General Plan that were referenced in the General Plan EIR, as well as Mitigation Measures 4.3-1a, 4.3- 1b, and 4.3-2, would reduce impacts to the greatest extent possible. Additionally, development facilitated by the project would be required to comply with Zoning Code Section 17.76.100 which includes requirements for the reduction of odors, particulate matter, and contaminants and requires compliance with Federal Environmental Protection Agency (EPA) and California Air Resources Board, and the Yolo Solano Air Quality Management Control District (YSAQMD) for sources of air emissions. These policies, actions, and mitigation measures would continue to be required with implementation of the Zoning Code Update.

While the proposed project would update both the Zoning Code and the 2035 General Plan, the new buildout of all sites undergoing a change would fall within the buildout numbers that were previously analyzed, thereby resulting in the same air quality impacts from new development, including exposure

Page 559 ends

Addendum Evaluation

Addendum Evaluation 27
to criteria pollutants, as evaluated in the certified EIR. In addition, the proposed project would not result in increased density or more development than was envisioned in the 2035 General Plan.

The Zoning Code Update, in and of itself, does not propose specific projects but aligns the zoning code to match the 2035 General Plan and proposed GPAs. Because it is a regulatory update, the Zoning Code Update would not, in and of itself, result in impacts to air quality thresholds such as net increase of criteria pollutants, exposure of sensitive receptors to pollutant concentrations, and the creation of objectionable odors.

Future development facilitated by the Zoning Code Update would undergo project-specific developmental review, including design review, and would be subject to adopted development standards.

Conclusion
The Zoning Code Update would not result in impacts beyond those addressed or analyzed in the General Plan EIR nor present new information that shows impacts would be more significant than those described in the General Plan EIR. Therefore, the General Plan EIR applies to the Zoning Code Update and no additional environmental assessment of air quality is required.

6.4 Biological Resources
General Plan EIR Findings
The General Plan EIR determined that there would be a less than significant impact to biological resources with mitigation incorporated. Implementation of the Cumulative Scenario of the 2035 General Plan would result in conversion of habitat for special-status plant species, which could result in loss of special-status plants either through direct removal or through habitat degradation. However, the 2035 General Plan also includes policies to protect and reduce impacts to biological resources. Mitigation Measure 4.4-1a and Mitigation Measure 4.4-1b would be incorporated to reduce impacts to special- status plants and special-status plant habitats to a less than significant level. Similarly, the General Plan EIR determined that implementation of the 2035 General Plan would result in loss and degradation of suitable habitat for several special-status wildlife species and could result in take of State and Federally- listed wildlife species and loss or displacement of special-status wildlife populations. However, incorporation of Mitigation Measures 4.4-2a, 4.4-2b, and 4.4-2c would reduce impacts to a less than significant level.

The General Plan EIR also determined that impacts to riparian habitats and wetlands would be less than significant with incorporation of Mitigation Measures 4.4-3a, 4.4-3b, 4.4-3c, 4.4-3d, 4.4-4a, 4.4-4b, and

4.4-4c. The Cumulative Scenario of the 2035 General Plan plans for development within the Pacific flyway, a major bird migration route. However, buildout of the 2035 General Plan would not create a barrier to movement of migratory species or alter the character of existing habitat available to migrating birds such that it would no longer function as a migratory corridor. Therefore, impacts would be less than significant. The General Plan EIR determined that compliance with the 2035 General Plan policies and compliance with the City ordinance would reduce potential impacts to trees to a less than significant level.

The General Plan Land Use Diagram and 2035 General Plan policies and implementation programs have been designed to provide consistency with the proposed Yolo Habitat Conservation Plan/Natural Community Conservation Plan (HCP/NCCP). Impacts related to compliance would be less than significant with Mitigation Measures 4.4-7a, 4.4-7b, and 4.4-7c. Implementing the 2035 General Plan would not

Page 560 ends

City of Woodland
City of Woodland Zoning Code Update

28 substantially reduce the habitat of a fish or wildlife species, eliminate a plant or animal community, or substantially reduce the number or restrict the range of any endangered, rare, or threatened species because the majority of known occurrences of special-status species and their habitat would be preserved. Therefore, impacts to fish and wildlife would be less than significant.

Addendum Analysis
The proposed project would update the Zoning Code for consistency with the 2035 General Plan in addition to implementing several GPAs. The zone changes would have no impact on the total residential or non-residential buildout analyzed in the Cumulative Impacts section of the General Plan EIR, as they are intended to bring the zone changes in line with the General Plan. However, the various GPAs would lead to an increase in the total number of residential units and non-residential square footage in the city. This total would still be within the Cumulative Buildout totals that were previously analyzed in the General Plan EIR. The proposed project would update but not eliminate the fundamental regulations and requirements of the Zoning Code, such as meeting design standards. Policies and actions in the 2035 General Plan that were referenced in the General Plan EIR, along with all Mitigation Measures in the Section 4.4, Biological Resources, would reduce impacts to the greatest extent possible. These policies and actions would continue to be required with implementation of the Zoning Code Update.

Additionally, development facilitated by the project would be required to be consistent with General Plan Goal 7.B and Policies 7.B.1 through 7. B. 11, which protects biological resources including special status species, sensitive habitats, and open space within the city. Development facilitated by the project would also be required to comply with WMC Section 12.48 which is the City’s Tree Preservation Ordinance, Section 15.32 which implements the Yolo Habitat Conservation Plan/Natural Communities Conservation Plan, and Zoning Code Section 17.64.040, Landscaping, which sets requirements for tree planting areas associated with new development and major site renovations with the stated purpose of preserving existing established tree canopy.

While the proposed project would update both the Zoning Code and the 2035 General Plan, the new buildout of all sites undergoing a change would fall within the buildout numbers that were previously analyzed, thereby resulting in the same biological resources impacts from new development as evaluated in the certified EIR. In addition, the proposed project would not increase density or more development than was envisioned in the General Plan.

The Zoning Code Update, in and of itself, does not propose specific projects but aligns the zoning code to match the 2035 General Plan and proposed GPAs. Because it is a regulatory update, the Zoning Code Update would not, in and of itself, result in impacts to biological resources such as special status species, riparian or sensitive habitats, protected wetlands, wildlife corridors, or conflict with local policies, ordinances, or conservation plans.

Future development facilitated by the Zoning Code Update would undergo project-specific developmental review, including design review, and would be subject to adopted development regulations.

Conclusion
The Zoning Code Update would not result in impacts beyond those addressed or analyzed in the General Plan EIR nor present new information that shows impacts would be more significant than those described in the General Plan EIR. Therefore, the General Plan EIR applies to the Zoning Code Update and no additional environmental assessment of biological resources is required.

Page 561 ends

Addendum Evaluation

Addendum Evaluation 29

6.5 Cultural Resources
General Plan EIR Findings
The General Plan EIR determined that implementation of the Cumulative Scenario of the 2035 General Plan would result in significant and unavoidable impacts, even with the incorporation of mitigation measures. The 2035 General Plan plans for the construction of new buildings and structures.

Modification of existing buildings and structures could also occur in the city. Although there are no previously recorded archaeological resources within the city, future projects involving intensive grading, trenching, excavation, soil stockpiling, and other earthmoving activities could impact previously unrecorded cultural resources. Implementation of the 2035 General Plan Cumulative Scenario has the potential to damage or destroy archaeological and historic architectural resources that qualify as historical resources or unique archaeological resources under CEQA. Similarly, implementation of the 2035 General Plan Cumulative Scenario has the potential for discovery of human remains during ground- moving activities. The significance of such resources could be materially impaired because their ability to convey significance could be destroyed or diminished. Therefore, impacts would be significant and unavoidable even with the incorporation of Mitigation Measures 4.6-1a, 4.6-1b, 4.6-1c, 4.6-1d, and 4.6- 2, all of which are aimed at reducing impacts to cultural resources.

Addendum Analysis
The proposed project would update the Zoning Code for consistency with the 2035 General Plan in addition to implementing several GPAs. The zone changes would have no impact on the total residential or non-residential buildout analyzed in the Cumulative Impacts section of the General Plan EIR, as they are intended to bring the zone changes in line with the General Plan. However, the various GPAs would lead to an increase in the total number of residential units and non-residential square footage in the city. This total would still be within the Cumulative Buildout totals that were previously analyzed in the General Plan EIR. The proposed project would update but not eliminate the fundamental regulations and requirements of the Zoning Code, such as meeting design standards. Policies and actions in the 2035 General Plan that were referenced in the General Plan EIR, in addition to Mitigation Measures 4.6-1a,

4.6-1b, 4.6-1c, 4.6-1d, and 4.6-2, would reduce impacts to the greatest extent possible. General Plan Goal 7.E, and Policies 7.E.1 through 7.E.3, require the preservation of prehistoric, cultural, and archaeological resources within the city. Development facilitated by the project would also comply with WMC Section 15.24 which preserves historical landmarks, districts, and resources, including historic structures, within Woodland. Further, Zoning Code Section 17.56.050, Preservation/Restoration of and Additions to Historic Structures, provides design regulations pertaining to the improvement or re-use of historic structures and discourages the demolition of historic and potentially historic structures. These policies and actions would continue to be required with implementation of the Zoning Code Update.

While the proposed project would update both the Zoning Code and the 2035 General Plan, the new buildout of all sites undergoing a change would fall within the buildout numbers that were previously analyzed, thereby resulting in the same cultural resources impacts from new development as evaluated in the certified EIR. In addition, the proposed project would not result in increased density or more development than was envisioned in the General Plan because the proposed project buildout would not exceed the full buildout analyzed in the Cumulative Impacts section of the General Plan EIR.

The Zoning Code Update, in and of itself, does not propose specific projects but aligns the zoning code to match the 2035 General Plan and proposed GPAs. Because it is a regulatory update, the Zoning Code Update would not, in and of itself, result in impacts to cultural resources such as historical or archaeological resources, or human remains.

Page 562 ends

City of Woodland
City of Woodland Zoning Code Update

30 Future development facilitated by the Zoning Code Update would undergo project-specific developmental review, including design review, and would be subject to adopted development regulations. The proposed project would implement the 2035 General Plan, thereby resulting in the same cultural resources impacts from new development as evaluated in the certified EIR. In addition, the proposed project would not result in increased density or more development than was envisioned in the General Plan.

The Zoning Code Update, in and of itself, does not propose specific projects but aligns the zoning code to match the General Plan. Because it is a regulatory update, the Zoning Code Update would not, in and of itself, result in impacts to cultural resources such as historical or archaeological resources, or human remains.

Conclusion
The Zoning Code Update would not result in impacts beyond those addressed or analyzed in the General Plan EIR nor present new information that shows impacts would be more significant than those described in the General Plan EIR. Therefore, the General Plan EIR applies to the Zoning Code Update and no additional environmental assessment of cultural resources is required.

6.6 Energy
General Plan EIR Findings
The General Plan EIR determined that during construction and following buildout of the Cumulative Scenario of the 2035 General Plan, energy would be consumed in the forms of fossil fuels and electricity.

Projects facilitated under the Cumulative Scenario are required to meet currently applicable energy efficiency standards at the time of construction. Buildings would generally be more energy efficient than existing similar use buildings in the City, which were constructed according to existing or previous less stringent energy efficiency standards. In addition, older buildings tend to decrease in energy efficiency as infrastructure begins to degrade with time. Land uses developed in infill, mixed-use, and/or transit accessible areas would reduce vehicle miles traveled by allowing residents to use alternative modes of transportation rather than motor vehicles or reducing trip distances to access amenities. The Cumulative Scenario includes developments that would improve overall energy efficiency and result in a less than significant impact.

Implementation of the Cumulative Scenario of the 2035 General Plan would increase energy demand and would result in the need to extend services and infrastructure to new users in the city. Policies and implementation programs in the 2035 General Plan, as well as existing regulations would reduce potential impacts. Construction of facilities would occur within the assumed development footprint of the 2035 and impacts are considered throughout the General Plan EIR. Therefore, impacts resulting from the need for new or expanded energy production would be less than significant.

Addendum Analysis
The proposed project would update the Zoning Code for consistency with the 2035 General Plan in addition to implementing several GPAs. The zone changes would have no impact on the total residential or non-residential buildout analyzed in the Cumulative Impacts section of the General Plan EIR, as they are intended to bring the zone changes in line with the General Plan. However, the various GPAs would lead to an increase in the total number of residential units and non-residential square footage in the city. This total would still be within the Cumulative Buildout totals that were previously analyzed in the

Page 563 ends

Addendum Evaluation

Addendum Evaluation 31
General Plan EIR. The proposed project would update but not eliminate the fundamental regulations and requirements of the Zoning Code, such as meeting design standards. Policies and actions in the 2035 General Plan that were referenced in the General Plan EIR would reduce impacts to the greatest extent possible. Additionally, General Plan Policy 7.F.5, which requires electric equipment to be used during construction, would be applicable to future development facilitated by the proposed project.

Development facilitated by the project would be required to comply with Zoning Code Section

17.56.101.B., Shade, Cooling and Energy Conservation Requirements, which regulates and promotes the use of alternate energy sources such as solar facilities and heat recovery ventilation, and through design elements such as cool roofs, structural shade features, and building orientation. Zoning Code Section

17.56.010.D. Electrification, requires all new buildings be all-electric ready. These policies and actions would continue to be required with implementation of the Zoning Code Update.

While the proposed project would update both the Zoning Code and the 2035 General Plan, the new buildout of all sites undergoing a change would fall within the buildout numbers that were previously analyzed, thereby resulting in the similar energy resource impacts from new development as under the 2035 General Plan Cumulative Scenario. In addition, the proposed project would not result in increased density or more development than was envisioned in the General Plan.

The Zoning Code Update, in and of itself, does not propose specific projects but aligns the zoning code to match the 2035 General Plan and proposed GPAs. Because it is a regulatory update, the Zoning Code Update would not, in and of itself, result in impacts to energy such as resulting in wasteful or inefficient consumption of energy resources or conflict with a state or local energy plan.

Future development facilitated by the Zoning Code Update would undergo project-specific developmental review, including design review, and would be subject to adopted development regulations.

Conclusion
The Zoning Code Update would not result in impacts beyond those addressed or analyzed in the General Plan EIR nor present new information that shows impacts would be more significant than those described in the General Plan EIR. Therefore, the General Plan EIR applies to the Zoning Code Update and no additional environmental assessment of energy is required.

6.7 Geology and Soils
General Plan EIR Findings
The General Plan EIR determined the 2035 General Plan Cumulative Scenario would result in construction with potential exposure to geologic hazards. All applicable projects would be required to comply with the California Building Code, which includes engineering practices that mandate special design and construction methods to reduce or eliminate hazards from seismic ground shaking and construction in expansive soil. In addition, the California Building Code also contains drainage-related requirements to reduce seasonal fluctuations in soil moisture content. In addition, incorporation of Mitigation Measure 4.7-3a would reduce hazards from unstable or expansive soils. Therefore, the effects related to seismic ground shaking; liquefaction; and geologic hazards related to unstable soils, expansive soils, and soil unsuitable for septic systems would be less than significant with mitigation. In addition, construction of the Cumulative Scenario would result in substantial grading, excavation, and earth-moving activities. All applicable projects are required to comply with the City of Woodland Stormwater Management Program and National Pollutant Discharge Elimination System (NPDES)

Page 564 ends

City of Woodland
City of Woodland Zoning Code Update

32 regulations, including construction site storm water pollution prevention plans (SWPPPs) and best management practices (BMPs), which would control soil erosion at each construction site. Therefore, the effects from construction erosion would be less than significant.

Development forecast under 2035 General Plan Cumulative Scenario would involve development in areas with geologic and soils constraints, in areas that could have paleontological resources sensitivity.

Sensitive geologic units considered for paleontological resources are widespread in the Sacramento region. Mitigation Measure 4.7-4 would create a new implementation program that contains additional resource disturbance prevention activities and a cease-work requirement upon paleontological resource discovery, and impacts to paleontological resources would be reduced to a less than significant level.

Addendum Analysis
The proposed project would update the Zoning Code for consistency with the 2035 General Plan in addition to implementing several GPAs. The zone changes would have no impact on the total residential or non-residential buildout analyzed in the Cumulative Impacts section of the General Plan EIR, as they are intended to bring the zone changes in line with the General Plan. However, the various GPAs would lead to an increase in the total number of residential units and non-residential square footage in the city. This total would still be within the Cumulative Buildout totals that were previously analyzed in the General Plan EIR. The proposed project would update but not eliminate the fundamental regulations and requirements of the Zoning Code, such as meeting design standards. Policies and actions in the 2035 General Plan that were referenced in the General Plan EIR, in addition to Mitigation Measure 4.7-3a and

4.7-4, would reduce impacts to the greatest extent possible. Further WMC Title 15 and 16 speak to soils investigation requirements as part of future subdivision maps and development proposals. These policies and actions would continue to be required with implementation of the Zoning Code Update.

While the proposed project would update both the Zoning Code and the 2035 General Plan, the new buildout of all sites undergoing a change would fall within the buildout numbers that were previously analyzed, thereby resulting in the same geology and soils resources impacts from new development as evaluated in the certified EIR. In addition, the proposed project would not result in increased density or more development than was envisioned in the General Plan.

The Zoning Code Update, in and of itself, does not propose specific projects but aligns the zoning code to match the 2035 General Plan and proposed GPAs. Because it is a regulatory update, the Zoning Code Update would not, in and of itself, result in impacts to geology and soils such as causing potential adverse effects involving fault rupture, ground shaking, liquefaction, and landslides. Nor would the update result in loss of topsoil, cause a geologic unit to become unstable, be located on soils incapable of supporting septic tank use, or destroy a unique paleontological resource.

Future development facilitated by the Zoning Code Update would undergo project-specific developmental review, including design review, and would be subject to adopted development regulations.

Conclusion
The Zoning Code Update would not result in impacts beyond those addressed or analyzed in the General Plan EIR nor present new information that shows impacts would be more significant than those described in the General Plan EIR. Therefore, the General Plan EIR applies to the Zoning Code Update and no additional environmental assessment of geology and soils is required.

Page 565 ends

Addendum Evaluation

Addendum Evaluation 33

6.8 Greenhouse Gas Emissions
General Plan EIR Findings
The General Plan EIR determined that implementation of the Cumulative Scenario would implement planned land uses that would involve greenhouse gas (GHG) emissions associated with short-term construction and infrastructure, along with long-term operational emissions. Incorporation of Mitigation Measures 4.5-1a, 4.5-1b, and 4.5-1c would reduce impacts to a less than cumulatively considerable impact. The 2035 General Plan policies and implementation programs and the 2035 CAP ensure that GHG emissions within the city occur at a rate that is consistent with goals set for the State government to reduce GHG emissions. Projects that seek to use streamlining identified under SB 375 would need to determine consistency with Sacramento Area Council of Government’s (SACOG) Metropolitan Transportation Plan/Sustainable Communities Strategy (MTP/SCS). Incorporation of Mitigation Measure

4.5-2 would reduce impacts to a less than significant level.

Addendum Analysis
The proposed project would update the Zoning Code for consistency with the 2035 General Plan in addition to implementing several GPAs. The zone changes would have no impact on the total residential or non-residential buildout analyzed in the Cumulative Impacts section of the General Plan EIR, as they are intended to bring the zone changes in line with the General Plan. However, the various GPAs would lead to an increase in the total number of residential units and non-residential square footage in the city. This total would still be within the Cumulative Buildout totals that were previously analyzed in the General Plan EIR. The proposed project would update but not eliminate the fundamental regulations and requirements of the Zoning Code, such as meeting design standards. Policies and actions in the 2035 General Plan that were referenced in the General Plan EIR, in addition to Mitigation Measures 4.5-1a,

4.5-1b, 4.5-1c, and 4.5-2, would reduce impacts to the greatest extent possible. Additionally, future development facilitated by the project would comply with General Plan Policies 7.F.7 through 7.F.11, which aim to reduce greenhouse gas emissions within the city, and Zoning Code Sections 17.56.010.B.

Shade, Cooling and Energy Conservation Requirements, C. Sustainable Materials and Construction Practices, and D. Electrification, establish sustainable design guidelines and conservation requirements to reduce energy use and GHG emissions. These policies and actions would continue to be required with implementation of the Zoning Code Update.

While the proposed project would be updating both the Zoning Code and the 2035 General Plan, the new buildout of all sites undergoing a change would fall within the buildout numbers that were previously analyzed, thereby resulting in the same greenhouse gas emissions impacts from new development as evaluated in the certified EIR. In addition, the proposed project would not result in increased density or more development than was envisioned in the General Plan.

The Zoning Code Update, in and of itself, does not propose specific projects but aligns the zoning code to match the 2035 General Plan and proposed GPAs. Because it is a regulatory update, the Zoning Code Update would not, in and of itself, result in impacts to greenhouse gas emissions such as resulting in a significant environmental impact or conflicting with an applicable greenhouse gas emission reduction plan.

Future development facilitated by the Zoning Code Update would undergo project-specific developmental review, including design review, and would be subject to adopted development regulations.

Page 566 ends

City of Woodland
City of Woodland Zoning Code Update

34 Conclusion
The Zoning Code Update would not result in impacts beyond those addressed or analyzed in the General Plan EIR nor present new information that shows impacts would be more significant than those described in the General Plan EIR. Therefore, the General Plan EIR applies to the Zoning Code Update and no additional environmental assessment of greenhouse gas emissions is required.

6.9 Hazards and Hazardous Materials
General Plan EIR Findings
The General Plan EIR determined that implementation of the 2035 General Plan Cumulative Scenario will likely result in an increase in routine use, transportation, and disposal of hazardous materials, as well as handling of hazardous materials near existing and proposed schools. However, existing federal, State, and local regulations create and enforce standards for these activities. Upset or accident conditions, emissions of hazardous materials, and development on a site listed as containing hazardous materials usually occur on a project-by-project basis, rather than in a cumulative manner.

Implementation of the 2035 General Plan Cumulative Scenario would allow for a wide variety of uses that could result in upset or accident conditions involving the release of hazardous materials. However, compliance with policies contained in the 2035 General Plan that enforce safety standards, require detailed planning for uses that generate hazardous materials, require buffers between hazardous sites and sensitive receptors, and require the tracking of data on hazardous materials would reduce this impact to a less than significant level. Individual projects in Yolo County and nearby cities would be required to comply with federal, State, and local regulations. There are 14 airports in the Sacramento region. SACOG serves as the Airport Land Use Commission (ALUC) and has developed Airport Land Use Compatibility Plans (ALUCP) for almost all of the airports. Compliance with the ALUCPs and existing federal, State, and local laws protect the safety of people near airports and private airstrips. Threats of wildfires on non-federal lands in unincorporated areas are the responsibility of CAL FIRE and addressed through compliance with Title 14 of the California Code of Regulations, Division 1.5. Federal lands fall under Federal Responsibility Areas, and all incorporated areas and other unincorporated lands are classified as Local Responsibility Areas. Therefore, there would be no impact on wildfire hazards.

Addendum Analysis
The proposed project would update the Zoning Code for consistency with the 2035 General Plan in addition to implementing several GPAs. The zone changes would have no impact on the total residential or non-residential buildout analyzed in the Cumulative Impacts section of the General Plan EIR, as they are intended to bring the zone changes in line with the General Plan. However, the various GPAs would lead to an increase in the total number of residential units and non-residential square footage in the city. The proposed project would update but not eliminate the fundamental regulations and requirements of the Zoning Code, such as meeting design standards. Policies and actions in the 2035 General Plan that were referenced in the General Plan EIR would reduce impacts to the greatest extent possible. Additionally, development facilitated by the proposed project would comply with General Plan Goal 8.E and Policies 8.E.1 through 8.E.6, which are intended to minimize the risk of loss of life, injury, serious illness, damage to property, and negative economic and social impacts resulting from the use, transport, treatment, and disposal of hazardous materials and hazardous materials waste. Development facilitated by the project would also be required to comply with Zoning Code Section 17.76.050 and

17.76.060 which regulates hazardous materials including fire and explosive hazards. These code sections require compliance with the California Hazardous Materials Regulations, the California Fire and

Page 567 ends

Addendum Evaluation

Addendum Evaluation 35
Building Codes, the California Department of Toxic Substances Control, and the County Environmental Health Agency with regard to the use, handling storage and transportation of hazardous materials.

These policies and actions would continue to be required with implementation of the Zoning Code Update.

While the proposed project would update both the Zoning Code and the 2035 General Plan, the new buildout of all sites undergoing a change would fall within the buildout numbers that were previously analyzed, thereby resulting in the same hazards and hazardous materials impacts from new development as evaluated in the certified EIR. In addition, the proposed project would not result in increased density or more development than was envisioned in the General Plan.

The Zoning Code Update, in and of itself, does not propose specific projects but aligns the zoning code to match the 2035 General Plan and proposed GPAs. Because it is a regulatory update, the Zoning Code Update would not, in and of itself, result in hazards and hazardous materials impacts such as hazardous material accidental release during transport or spill, hazardous emissions near schools, located on a site which is listed as a hazardous materials site, noise or safety concerns near airport, impair an emergency response plan, or expose people or structures to significant risk of wildland fires.

Future development facilitated by the Zoning Code Update would undergo project-specific developmental review, including design review, and would be subject to adopted development standards.

Conclusion
The Zoning Code Update would not result in impacts beyond those addressed or analyzed in the General Plan EIR nor present new information that shows impacts would be more significant than those described in the General Plan EIR. Therefore, the General Plan EIR applies to the Zoning Code Update and no additional environmental assessment of hazards and hazardous materials is required.

6.10 Hydrology and Water Quality
General Plan EIR Findings
The General Plan EIR determined that implementation of the 2035 General Plan Cumulative Scenario would result in no impact to long-term water quality. Implementation of the 2035 General Plan Cumulative would convert large areas of undeveloped land to residential, commercial, industrial, and mix-uses, as well as intensify land uses as infill in existing downtown and major corridor areas, resulting in impacts related to additional discharges of pollutants to receiving water bodies. Such pollutants would result in adverse changes to the water quality of local water bodies. However, with adoption and implementation of the proposed policies in the Proposed Project, combined with current land use, stormwater, grading, and erosion control regulations, this impact would be less than significant with Mitigation Measure 4.9-1 incorporated. Construction and grading activities during development consistent with the Proposed Project could result in excess runoff, soil erosion, and stormwater discharges of suspended solids and increased turbidity. Such activities could mobilize other pollutants from project construction sites as contaminated runoff to on-site and ultimately off-site drainage channels. Many construction-related wastes have the potential to degrade existing water quality.

Construction activities that are implemented without mitigation could violate water quality standards or cause direct harm to aquatic organisms. However, with implementation of existing regulations and water quality policies contained in the 2035 General Plan, this impact would be less than significant with incorporation of Mitigation Measure 4.9-2.

Page 568 ends

City of Woodland
City of Woodland Zoning Code Update

36 Development and land use change consistent with the 2035 General Plan would increase the amount of impervious surfaces, thereby increasing surface runoff. This increase in surface runoff would result in an increase in both the total volume and the peak discharge rate of stormwater runoff, and therefore could result in greater potential for erosion, sedimentation, hydromodification, and on- and offsite flooding.

However, with adoption and implementation of the proposed policies and actions in the 2035 General Plan, combined with current grading, erosion, and flood control regulations, this impact would be less than significant with incorporation of Mitigation Measure 4.9-3. An increase in water demands and associated depletion of groundwater supplies could also result from the land use changes under the 2035 General Plan Cumulative Scenario; however, access to new surface water supplies and opportunities for conjunctive use through aquifer storage and recovery would result in a reduced reliance on groundwater supplies. With compliance with existing regulations and implementation 2035 General Plan policies, this impact would be less than significant.

Implementation of the 2035 General Plan Cumulative Scenario would place housing in new growth areas within a current 200-year flood hazard area only if a funded, comprehensive flood solution is secured.

Additional policies in the General Plan limit the flooding risks of infill development. Implementation of the 2035 General Plan Cumulative Scenario would place structures within a 200-year flood hazard area; however, policies in the 2035 General Plan prohibit diversion of flood flows onto adjacent properties.

The 2035 General Plan Cumulative Scenario plans for infill and new growth development in areas within the levee and dam inundation areas. Policies within the 2035 General Plan would aid in limiting the flooding risk of infill developments and prohibit diversion of flood flows to adjacent properties. In addition, all new developments in dam inundation areas resulting from implementation of the 2035 General Plan Cumulative Scenario would be required to comply with all federal, State, and regional policies. Therefore, all impacts related to potential flooding or inundation of the project area would be considered less than significant.

Addendum Analysis
The proposed project would update the Zoning Code for consistency with the 2035 General Plan in addition to implementing several GPAs. The zone changes would have no impact on the total residential or non-residential buildout analyzed in the Cumulative Impacts section of the General Plan EIR, as they are intended to bring the zone changes in line with the General Plan. However, the various GPAs would lead to an increase in the total number of residential units and non-residential square footage in the city. This total would still be within the Cumulative Buildout totals that were previously analyzed in the General Plan EIR. The proposed project would update but not eliminate the fundamental regulations and requirements of the Zoning Code, such as meeting design standards. Policies and actions in the 2035 General Plan that were referenced in the General Plan EIR, in addition to Mitigation Measures 4.9-1, 4.9- 2, and 4.9-3, would reduce impacts to the greatest extent possible. Additionally, development facilitated by the proposed project would comply with General Plan Goal 7.A and Policies 7.A.4 and 7.A.5, which protect water quality within the city. Regarding flooding impacts, General Plan policies 8.B.1 through

8.B.3, which set requirements for floodplain zoning and flood hazard evaluation, would be applicable to future development facilitated by the project. Zoning Code Sections 17.56.010, 17.64.040 and 17.88 include requirements for water conservation to be included in building design, would implement the Water Conservation in Landscaping Act, and includes flood management requirements, respectively.

These policies and actions would continue to be required with implementation of the Zoning Code Update.

While the proposed project would update both the Zoning Code and the 2035 General Plan, the new buildout of all sites undergoing a change would fall within the buildout numbers that were previously

Page 569 ends

Addendum Evaluation

Addendum Evaluation 37
analyzed, thereby resulting in the same hydrology and water quality impacts from new development as evaluated in the certified EIR. In addition, the proposed project would not result in increased density or more development than was envisioned in the General Plan.

The Zoning Code Update, in and of itself, does not propose specific projects but aligns the zoning code to match the 2035 General Plan and proposed GPAs. Because it is a regulatory update, the Zoning Code Update would not, in and of itself, result in impacts to hydrology and water quality such as resulting in a violation of water quality standards, decreased groundwater supplies or groundwater recharge, altered drainage patterns resulting in increased flooding, tsunami, or seiche hazard risks, or conflict with a water quality control plan.

Future development facilitated by the Zoning Code Update would undergo project-specific developmental review, including design review, and would be subject to adopted development standards.

Conclusion
The Zoning Code Update would not result in impacts beyond those addressed or analyzed in the General Plan EIR nor present new information that shows impacts would be more significant than those described in the General Plan EIR. Therefore, the General Plan EIR applies to the Zoning Code Update and no additional environmental assessment of hydrology and water quality is required.

6.11 Land Use and Planning
General Plan EIR Findings
The General Plan EIR determined that implementation of the 2035 General Plan Cumulative Scenario would not physically divide an established community, as the entire city would undergo changes as part of Implementation of the Cumulative Scenario. In addition, the 2035 General Plan includes several policies that encourage development to be done in a manner that does not isolate or lead to the division of communities. Therefore, this impact would be less than significant. The 2035 General Plan proposes land use designations of unincorporated county land that differ from the land use designations in the Yolo County 2030 General Plan. Until the unincorporated land in the Planning Area is annexed, the County’s general plan and land use regulations apply. The Cumulative Scenario would not conflict with an applicable land use plans, policies, or regulations and therefore result in a less than significant level.

Addendum Analysis
The proposed project would update the Zoning Code for consistency with the 2035 General Plan, including consistency with the land use and growth strategies identified in the General Plan. The zone changes would not exceed the total residential or non-residential buildout analyzed in the Cumulative Impacts section of the General Plan EIR. However, the various GPAs would lead to an increase in the total number of residential units and non-residential square footage in the city. This total would still be within the Cumulative Buildout totals that were previously analyzed in the General Plan EIR. The proposed project would update but not eliminate the fundamental regulations and requirements of the Zoning Code, such as meeting design standards. Policies and actions in the 2035 General Plan that were referenced in the General Plan EIR would reduce impacts to the greatest extent possible. Additionally, General Plan Policies 2.A.1, 2.A.5 and 2.E.1 through 2.E.3, which promote high quality development and transition areas within the city, would be applicable to future development facilitated by the project.

Page 570 ends

City of Woodland
City of Woodland Zoning Code Update

38 These policies and actions would continue to be required with implementation of the Zoning Code Update.

While the proposed project would update both the Zoning Code and the 2035 General Plan, the new buildout of all sites undergoing a change would fall within the buildout numbers that were previously analyzed, thereby resulting in the same land use impacts from new development as evaluated in the certified EIR. In addition, the proposed project would not result in increased density or more development than was envisioned in the General Plan.

The Zoning Code is the primary tool used to implement the policies of the city’s General Plan, in particular those related to land use, site planning and building design. The Zoning code provides permitted use and development standards that directly and indirectly relate to the quality of life, health, sustainability and safety goals of the city, establish by the General Plan. In addition to bringing the citywide zoning code into compliance with the 2035 General Plan, the code update ensures city compliance with numerous statewide legislative updates that have occurred over the past several years, particularly those related to streamlining the production of new housing and removing barriers to housing development. The Zoning Code Update, in and of itself, does not propose specific projects but aligns the zoning code to match the 2035 General Plan and proposed GPAs. Because it is a regulatory update, the Zoning Code Update would not, in and of itself, result in impacts to land use such as physically dividing an established community or conflicting with a land use plan or policy.

Future development facilitated by the Zoning Code Update would undergo project-specific developmental review, including design review, and would be subject to adopted development standards.

Conclusion
The Zoning Code Update would not result in impacts beyond those addressed or analyzed in the General Plan EIR nor present new information that shows impacts would be more significant than those described in the General Plan EIR. Therefore, the General Plan EIR applies to the Zoning Code Update and no additional environmental assessment of land use and planning is required.

6.12 Mineral Resources
General Plan EIR Findings
The General Plan EIR determined that the 2035 General Plan Cumulative Scenario would not result in the loss of availability of a known mineral resource or of a locally important mineral resource recovery site, as the City does not contain any known areas of mineral resources. Therefore, implementation of the land use changes consistent with the 2035 General Plan Cumulative Scenario would have no impact related to the loss of availability of mineral resources.

Addendum Analysis
The proposed project would update the Zoning Code for consistency with the 2035 General Plan in addition to implementing several GPAs. The zone changes would have no impact on the total residential or non-residential buildout analyzed in the Cumulative Impacts section of the General Plan EIR, as they are intended to bring the zone changes in line with the General Plan. However, the various GPAs would lead to an increase in the total number of residential units and non-residential square footage in the city. This total would still be within the Cumulative Buildout totals that were previously analyzed in the General Plan EIR. The proposed project would update but not eliminate the fundamental regulations

Page 571 ends

Addendum Evaluation

Addendum Evaluation 39
and requirements of the Zoning Code, such as meeting design standards. Policies and actions in the 2035 General Plan that were referenced in the General Plan EIR would reduce impacts to the greatest extent possible. Additionally, General Plan Goal 7.D and Policies 7.D.1 and 7.D.2, which protect mineral resources within the city, would be applicable to future development facilitated by the project. These policies and actions would continue to be required with implementation of the Zoning Code Update.

While the proposed project would update both the Zoning Code and the 2035 General Plan, the new buildout of all sites undergoing a change would fall within the buildout numbers that were previously analyzed, thereby resulting in the same mineral resources impacts from new development as evaluated in the certified EIR. In addition, the proposed project would not result in increased density or more development than was envisioned in the General Plan.

The Zoning Code Update, in and of itself, does not propose specific projects but aligns the zoning code to match the General Plan. Because it is a regulatory update, the Zoning Code Update would not, in and of itself, result in impacts to mineral resources such as loss of availability of a known mineral resource for the region, or loss of a locally important mineral resource recovery site.

Future development facilitated by the Zoning Code Update would undergo project-specific developmental review, including design review, and would be subject to adopted development standards.

Conclusion
The Zoning Code Update would not result in impacts beyond those addressed or analyzed in the General Plan EIR nor present new information that shows impacts would be more significant than those described in the General Plan EIR. Therefore, the General Plan EIR applies to the Zoning Code Update and no additional environmental assessment of mineral resources is required.

6.13 Noise
General Plan EIR Findings
The General Plan EIR determined that future development and implementation of the policies in the 2035 General Plan and Cumulative Scenario would result in exposure of existing and proposed noise sensitive land uses to noticeable increases from construction activities. Therefore, Mitigation Measure

4.11-1 is required in order to reduce impacts from construction noise. However, for construction sites that are adjacent to noise-sensitive uses, there still could be a substantial temporary increase in noise levels that could lead to adverse noise-related impacts and impacts would be significant and unavoidable. Future development of new noise-sensitive land uses would occur under the Proposed Project within areas that either are currently exposed to noise from both transportation and non- transportation noise sources, or will be in the future. Uses allowed under the 2035 General Plan could potentially expose existing or planned noise-sensitive uses to noise levels that exceed local standards.

For that reason, Mitigation Measures 4.11-2a and 4.11-2b would be incorporated in order to reduce transportation and operational noise. However, impacts would remain significant and unavoidable.

Construction of projects under the Cumulative Scenario could cause temporary, short-term disruptive vibration for locations near sensitive receptors. Under the Cumulative Scenario, new vibration-sensitive uses could locate in areas exposed to vibration. Mitigation Measure 4.11-3a and 4.11-3b would be incorporated in order to reduce vibration, but impacts would be significant and unavoidable. The City of Woodland is outside of the 60 dB CNEL contours of all nearby airports. Therefore, there would be a less than significant impact resulting from airport noise.

Page 572 ends

City of Woodland
City of Woodland Zoning Code Update

40 Addendum Analysis
The proposed project would update the Zoning Code for consistency with the 2035 General Plan in addition to implementing several GPAs. The zone changes would have no impact on the total residential or non-residential buildout analyzed in the Cumulative Impacts section of the General Plan EIR, as they are intended to bring the zone changes in line with the General Plan. However, the various GPAs would lead to an increase in the total number of residential units and non-residential square footage in the city. This total would still be within the Cumulative Buildout totals that were previously analyzed in the General Plan EIR. The proposed project would update but not eliminate the fundamental regulations and requirements of the Zoning Code, such as meeting design standards. Policies and actions in the 2035 General Plan that were referenced in the General Plan EIR, as well as all applicable mitigation measures required in the General Plan EIR, would reduce impacts to the greatest extent possible. Additionally, General Plan Goal 8.G and Policies 8.G.1 through 8.G.15, which set noise compatibility standards, and Zoning Code Section 17.76.110 and 17.76.120, which set noise and vibration standards consistent with the General Plan, would be applicable to future development facilitated by the project. These policies, actions, and mitigation measures would continue to be required with implementation of the Zoning Code Update.

While the proposed project would update both the Zoning Code and the 2035 General Plan, the new buildout of all sites undergoing a change would fall within the buildout numbers that were previously analyzed, thereby resulting in the same noise impacts from new development as evaluated in the certified EIR. In addition, the proposed project would not result in increased density or more development than was envisioned in the General Plan.

The Zoning Code Update, in and of itself, does not propose specific projects but aligns the zoning code to match the 2035 General Plan and proposed GPAs. Because it is a regulatory update, the Zoning Code Update would not, in and of itself, result in impacts to noise such as increased ambient noise levels, excess groundborne vibration, or noise exposure near an airport or private airstrip.

Future development facilitated by the Zoning Code Update would undergo project-specific developmental review, including design review, and would be subject to adopted development standards and the standard conditions of approval required by the General Plan EIR noise mitigation measures.

Conclusion
The Zoning Code Update would not result in impacts beyond those addressed or analyzed in the General Plan EIR nor present new information that shows impacts would be more significant than those described in the General Plan EIR. Therefore, the General Plan EIR applies to the Zoning Code Update and no additional environmental assessment of noise is required.

6.14 Population and Housing
General Plan EIR Findings
The General Plan EIR determined that implementation of the 2035 General Plan Cumulative Scenario would result in significant and unavoidable impacts related to population and housing. Implementation of Cumulative Scenario would induce population growth substantially higher than that projected in the SACOG regional population projections. Therefore, this impact would be significant and unavoidable. In addition, the General Plan EIR determined that policies in the 2035 General Plan would reduce impacts

Page 573 ends

Addendum Evaluation

Addendum Evaluation 41
related to displacement resulting from the Cumulative Scenario, and the Cumulative Scenario would lead to an increase in housing throughout the city. Therefore, this impact would be less than significant.

Addendum Analysis
The proposed project would update the Zoning Code for consistency with the 2035 General Plan in addition to implementing several GPAs, and is intended to streamline housing and encourage infill development, consistent with the Regional Housing Needs Allocation (RHNA) for the city. The zone changes would have no impact on the total residential or non-residential buildout analyzed in the Cumulative Impacts section of the General Plan EIR, as they are intended to bring the zone changes in line with the General Plan. However, the various GPAs would lead to an increase in the total number of residential units and non-residential square footage in the city. This total would still be within the Cumulative Buildout totals that were previously analyzed in the General Plan EIR. The proposed project would update but not eliminate the fundamental regulations and requirements of the Zoning Code, such as meeting design standards. Policies and actions in the 2035 General Plan that were referenced in the General Plan EIR would reduce impacts to the greatest extent possible. These policies and actions would continue to be required with implementation of the Zoning Code Update.

While the proposed project would update both the Zoning Code and the 2035 General Plan, the new buildout of all sites undergoing a change would fall within the buildout numbers that were previously analyzed, thereby resulting in the same population and housing impacts from new development as evaluated in the certified EIR. In addition, the proposed project would not result in increased density or more development than was envisioned in the General Plan.

The Zoning Code Update, in and of itself, does not propose specific projects but aligns the zoning code to match the 2035 General Plan and proposed GPAs. Because it is a regulatory update, the Zoning Code Update would not, in and of itself, result in impacts to population and housing such as inducing substantial unplanned population growth or displacing existing housing or people.

Future development facilitated by the Zoning Code Update would undergo project-specific developmental review, including design review, and would be subject to adopted development standards.

Conclusion
The Zoning Code Update would not result in impacts beyond those addressed or analyzed in the General Plan EIR nor present new information that shows impacts would be more significant than those described in the General Plan EIR. Therefore, the General Plan EIR applies to the Zoning Code Update and no additional environmental assessment of population and housing is required.

6.15 Public Services
General Plan EIR Findings
The General Plan EIR states growth resulting from the 2035 General Plan Cumulative Scenario would create demand for new public services in the city. The 2035 General Plan includes Policy 5.B.4 and 5.A.3 to ensure that sufficient facilities and services are provided to serve additional growth. These policies and programs apply to any level of development, and therefore would mitigate the Cumulative Scenario.

For this reason, impacts to fire and police protection services would be less than significant under the Cumulative Scenario. Implementation of the 2035 General Plan will reduce the impacts related to school services. Specifically, Goal 5.E and Policy 5.E.2 encourage coordination with the Woodland Joint Unified

Page 574 ends

City of Woodland
City of Woodland Zoning Code Update

42 School District and other educational institutions regarding future school sites. Therefore, impacts to schools would be less than significant. Parks and Recreation was also covered in Section 6.1.3.12 of the General Plan EIR, and the results have been summarized in Section 6.16, below.

Addendum Analysis
The proposed project would update the Zoning Code for consistency with the 2035 General Plan in addition to implementing several GPAs. The zone changes would not exceed the total residential or non- residential buildout analyzed in the Cumulative Impacts section of the General Plan EIR. However, the various GPAs would lead to an increase in the total number of residential units and non-residential square footage in the city. This total would still be within the Cumulative Buildout totals that were previously analyzed in the General Plan EIR. The proposed project would update but not eliminate the fundamental regulations and requirements of the Zoning Code, such as meeting design standards.

Policies and actions in the 2035 General Plan that were referenced in the General Plan EIR would reduce impacts to the greatest extent possible. These policies and actions would continue to be required with implementation of the Zoning Code Update.

While the proposed project would update both the Zoning Code and the 2035 General Plan, the new buildout of all sites undergoing a change would fall within the buildout numbers that were previously analyzed, thereby resulting in the same public services impacts from new development as evaluated in the certified EIR. In addition, the proposed project would not result in increased density or more development than was envisioned in the General Plan.

The Zoning Code Update, in and of itself, does not propose specific projects but aligns the zoning code to match the 2035 General Plan and proposed GPAs. Because it is a regulatory update, the Zoning Code Update would not, in and of itself, result in impacts to public services such as lowered service capabilities for fire and police protection, schools, parks, and other public facilities such that new facilities would be required.

Future development facilitated by the Zoning Code Update would undergo project-specific developmental review, including design review, and would be subject to adopted development standards.

Conclusion
The Zoning Code Update would not result in impacts beyond those addressed or analyzed in the General Plan EIR nor present new information that shows impacts would be more significant than those described in the General Plan EIR. Therefore, the General Plan EIR applies to the Zoning Code Update and no additional environmental assessment of public services is required.

6.16 Recreation
General Plan EIR Findings
The General Plan EIR states that several agencies provide park and recreation services in the region, including counties, cities, and special districts. An increase in population within the city under the Cumulative Scenario may increase demand for parks and recreation facilities and services. However, these local jurisdictions have authority over land use, set and implement level of service standards, and determine the siting and timing of public service projects. For this reason, impacts to parks and recreation would be less than significant.

Page 575 ends

Addendum Evaluation

Addendum Evaluation 43
Addendum Analysis
The proposed project would update the Zoning Code for consistency with the 2035 General Plan in addition to implementing several GPAs. The zone changes would have no impact on the total residential or non-residential buildout analyzed in the Cumulative Impacts section of the General Plan EIR, as they are intended to bring the zone changes in line with the General Plan. However, the various GPAs would lead to an increase in the total number of residential units and non-residential square footage in the city. This total would still be within the Cumulative Buildout totals that were previously analyzed in the General Plan EIR. The proposed project would update but not eliminate the fundamental regulations and requirements of the Zoning Code, such as meeting design standards. Policies and actions in the 2035 General Plan that were referenced in the General Plan EIR would reduce impacts to the greatest extent possible. Additionally, General Plan Policies 5.C.3 through 5.C.10, which set requirements for parkland and encourage accessible park amenities, would be applicable to future development facilitated by the project, as would Zoning Code Sections 17.56.030, 17.56.040, and 17.56.070, set minimum private and shared open space requirements for multi-family, small lot, and mixed-use development types through site planning and design requirements. These policies and actions would continue to be required with implementation of the Zoning Code Update.

While the proposed project would update both the Zoning Code and the 2035 General Plan, the new buildout of all sites undergoing a change would fall within the buildout numbers that were previously analyzed, thereby resulting in the same recreation impacts from new development as evaluated in the certified EIR. In addition, the proposed project would not result in increased density or more development than was envisioned in the General Plan.

The Zoning Code Update, in and of itself, does not propose specific projects but aligns the zoning code to match the 2035 General Plan and proposed GPAs. Because it is a regulatory update, the Zoning Code Update would not, in and of itself, result in impacts to recreation such as increasing park and public facilities usage requiring construction or expansion of new facilities.

Future development facilitated by the Zoning Code Update would undergo project-specific developmental review, including design review, and would be subject to adopted development standards.

Conclusion
The Zoning Code Update would not result in impacts beyond those addressed or analyzed in the General Plan EIR nor present new information that shows impacts would be more significant than those described in the General Plan EIR. Therefore, the General Plan EIR applies to the Zoning Code Update and no additional environmental assessment of recreation is required.

6.17 Transportation
General Plan EIR Findings
The General Plan EIR determined that the daily VMT per capita is expected to increase above baseline levels of 32.7 to 34.8 while VMT per service population is projected to decline from 20.5 to 19.2 under the Cumulative Scenario. In addition, policies 3.A.5, 3.A.10, and 3.A.11 and Implementation Program 3.3 of the 2035 General Plan require actions on the part of new development and the City that will reduce vehicle trips. Due to the decrease in per capita VMT and compliance with programs and policies in the 2035 General Plan, impacts would be less than significant. The Cumulative Scenario is expected to result in 33 roadway segments with LOS D, one with LOS E, and one with LOS F. The only unacceptable LOS

Page 576 ends

City of Woodland
City of Woodland Zoning Code Update

44 condition would occur on East Gum Avenue from Bourn Drive to Pioneer Avenue. This segment is projected to operate at LOS F under the Cumulative Scenario, while the acceptable LOS threshold is LOS C. While LOS is no longer applicable as a significant impact under CEQA, the 2035 General Plan EIR Cumulative Scenario would implement Mitigation Measure 4.13-1a, 4.13-1b, 4.13-1c, and 4.13-2 in order to reduce this impact to a less than significant impact. The Cumulative Scenario is not expected to conflict with applicable plans, ordinances, or policies establishing measures of effectiveness for the performance. In addition, the Cumulative Scenario’s contribution to air traffic patterns; hazards due to a design feature; emergency access; and transit, bicycle or pedestrian facilities is expected to be less than significant.

Addendum Analysis
The proposed project would update the Zoning Code for consistency with the 2035 General Plan in addition to implementing several GPAs. The zone changes would have no impact on the total residential or non-residential buildout analyzed in the Cumulative Impacts section of the General Plan EIR, as they are intended to bring the zone changes in line with the General Plan. However, the various GPAs would lead to an increase in the total number of residential units and non-residential square footage in the city. This total would still be within the Cumulative Buildout totals that were previously analyzed in the General Plan EIR. The proposed project would update but not eliminate the fundamental regulations and requirements of the Zoning Code, such as meeting design standards. Policies and actions in the 2035 General Plan that were referenced in the General Plan EIR, in addition to Mitigation Measure 4.13-1a, would reduce impacts to the greatest extent possible. Additionally, General Plan Policies 3.A.4, 3.A.12, and 3.B.5, which aim to reduce VMT within the city, requires evaluation of project impacts to traffic, and requires new development to include interconnected streets, would be applicable to future development facilitated by the proposed project. These policies and actions would continue to be required with implementation of the Zoning Code Update.

While the proposed project would update both the Zoning Code and the 2035 General Plan, the new buildout of all sites undergoing a change would fall within the buildout numbers that were previously analyzed thereby resulting in the same transportation impacts from new development as evaluated in the certified EIR. In addition, the proposed project would not result in increased density or more development than was envisioned in the General Plan. Therefore, the Zoning Code Update would not result in increased transportation impacts from LOS or VMT.

The Zoning Code Update, in and of itself, does not propose specific projects but aligns the zoning code to match the 2035 General Plan and proposed GPAs. Because it is a regulatory update, the Zoning Code Update would not, in and of itself, result in impacts to transportation such as conflicting with a current transportation plan or policy, increasing roadway design hazards, or inadequate emergency access.

Future development facilitated by the Zoning Code Update would undergo project-specific developmental review, including design review, and would be subject to adopted development standards.

Conclusion
The Zoning Code Update would not result in impacts beyond those addressed or analyzed in the General Plan EIR nor present new information that shows impacts would be more significant than those described in the General Plan EIR. Therefore, the General Plan EIR applies to the Zoning Code Update and no additional environmental assessment of transportation is required.

Page 577 ends

Addendum Evaluation

Addendum Evaluation 45

6.18 Tribal Cultural Resources
General Plan EIR Findings
The General Plan EIR does not analyze tribal cultural resources pursuant to AB 52 (passed in 2015) as the 2035 General Plan was initiated in 2013, prior to the enactment of AB 52. However, as a condition of Mitigation Measure 4.6-1b in Section 4.6, Cultural Resources, in the General Plan EIR requires that the 2035 General Plan be amended to include implementation programs to address the unanticipated discovery of a tribal cultural resource.

Addendum Analysis
As part of the outreach efforts associated with the Zoning Code Update, letters were sent to the following tribes and tribal contacts, in compliance with Senate Bill 18 (SB 18), to request information regarding the Zoning Code Update on March 29 and April 8, 2024:
▪ Torres Martinez Desert Cahuilla Indians
▪ Cortina Rancheria Band of Wintun Indians of California ▪ Ione Band of Miwok Indians
▪ United Auburn Indian Community of the Auburn Rancheria ▪ Wilton Rancheria
▪ Yocha Dehe Wintun Nation
▪ Cachil Dehe Band of Wintun Indians
▪ Grindstone Rancheria of Wintun-Wailaki Indians of California The City is not required to send out notification to tribes pursuant to Assembly Bill 52 (AB 52), as AB 52 applies only to projects that have submitted a Notice of Preparation (NOP) or Notice of Determination (NOD) filed after July 1, 2016. Since the General Plan was initiated in 2013, no AB 52 outreach was required.

The proposed project would update the Zoning Code for consistency with the 2035 General Plan in addition to implementing several GPAs. The zone changes would have no impact on the total residential or non-residential buildout analyzed in the Cumulative Impacts section of the General Plan EIR, as they are intended to bring the zone changes in line with the General Plan. However, the various GPAs would lead to an increase in the total number of residential units and non-residential square footage in the city. This total would still be within the Cumulative Buildout totals that were previously analyzed in the General Plan EIR. The proposed project would update but not eliminate the fundamental regulations and requirements of the Zoning Code, such as meeting design standards. Policies and actions in the 2035 General Plan that were referenced in the General Plan EIR, as well as Mitigation Measure 4.6-1b, would reduce impacts to the greatest extent possible. Additionally, General Plan Policy 7.E.3, which requires tribal consultation, would be applicable to future development facilitated by the project. These policies, actions, and mitigation measures would continue to be required with implementation of the Zoning Code Update.

While the proposed project would update both the Zoning Code and the 2035 General Plan, the new buildout of all sites undergoing a change would fall within the buildout numbers that were previously analyzed, thereby resulting in the same tribal cultural resources impacts from new development as evaluated in the certified EIR. In addition, the proposed project would not result in increased density or more development than was envisioned in the General Plan.

Page 578 ends

City of Woodland
City of Woodland Zoning Code Update

46 The Zoning Code Update, in and of itself, does not propose specific projects but aligns the zoning code to match the 2035 General Plan and proposed GPAs. Because it is a regulatory update, the Zoning Code Update would not, in and of itself, result in impacts to tribal cultural resources such as causing a substantial adverse change in the significance of a tribal cultural resource.

Future development facilitated by the Zoning Code Update would undergo project-specific developmental review, including design review, and would be subject to adopted development standards.

Conclusion
The Zoning Code Update would not result in impacts beyond those addressed or analyzed in the General Plan EIR nor present new information that shows impacts would be more significant than those described in the General Plan EIR. Therefore, the General Plan EIR applies to the Zoning Code Update and no additional environmental assessment of tribal cultural resources is required.

6.19 Utilities
General Plan EIR Findings
The General Plan EIR determined that implementation of the 2035 General Plan Cumulative Scenario would not exceed wastewater treatment requirements of the Central Valley Regional Water Quality Control Board and result in a less than significant impact. In addition, the Cumulative Scenario would not result in the need for the construction of or expansion of water or wastewater facilities and stormwater drainage facilities. Therefore, impacts to these facilities would be less than significant without the incorporation of mitigation. Implementation of the Cumulative Scenario would not result in having insufficient water supplies available to serve the project from existing entitlements and resources, nor are new or expanded entitlements needed. The General Plan EIR determined that the Cumulative Scenario would not result in a determination by the wastewater treatment provider which serves or may serve the project that it does not have adequate capacity to serve the project’s projected demand in addition to the provider’s existing commitments. There would be a less than significant impact.

Implementation of the Cumulative Scenario would be served by existing landfills with sufficient permitted capacity to serve the project’s solid waste disposal needs, and the Cumulative Scenario would be compliant with federal, State and local statutes and regulations related to solid waste. Therefore, impacts on solid waste and solid waste facilities would be less than significant.

Addendum Analysis
The proposed project would update the Zoning Code for consistency with the 2035 General Plan in addition to implementing several GPAs. The zone changes would have no impact on the total residential or non-residential buildout analyzed in the Cumulative Impacts section of the General Plan EIR, as they are intended to bring the zone changes in line with the General Plan. However, the various GPAs would lead to an increase in the total number of residential units and non-residential square footage in the city. This total would still be within the Cumulative Buildout totals that were previously analyzed in the General Plan EIR. The proposed project would update but not eliminate the fundamental regulations and requirements of the Zoning Code, such as meeting design standards. Policies and actions in the 2035 General Plan that were referenced in the General Plan EIR would reduce impacts to the greatest extent possible. These policies and actions would continue to be required with implementation of the Zoning Code Update.

Page 579 ends

Addendum Evaluation

Addendum Evaluation 47
While the proposed project would update both the Zoning Code and the 2035 General Plan, the new buildout of all sites undergoing a change would fall within the buildout numbers that were previously analyzed, thereby resulting in the same utilities impacts from new development as evaluated in the certified EIR. In addition, the proposed project would not result in increased density or more development than was envisioned in the General Plan.

The Zoning Code Update, in and of itself, does not propose specific projects but aligns the zoning code to match the 2035 General Plan and proposed GPAs. Because it is a regulatory update, the Zoning Code Update would not, in and of itself, result in impacts to utilities such as requiring water or wastewater treatment expansion, impacts to water supply for development, and solid waste capacity.

Future development facilitated by the Zoning Code Update would undergo project-specific developmental review, including design review, and would be subject to adopted development standards.

Conclusion
The Zoning Code Update would not result in impacts beyond those addressed or analyzed in the General Plan EIR nor present new information that shows impacts would be more significant than those described in the General Plan EIR. Therefore, the General Plan EIR applies to the Zoning Code Update and no additional environmental assessment of utilities is required.

6.20 Wildfire
General Plan EIR Findings
The General Plan EIR did not analyze wildfire in a standalone section. Instead, impacts of the Cumulative Scenario were studied under “Hazards and Hazardous Waste.” Threats of wildfires on non-federal lands in unincorporated areas are the responsibility of CAL FIRE and addressed through compliance with Title 14 of the California Code of Regulations, Division 1.5. Federal lands fall under Federal Responsibility Areas, and all incorporated areas and other unincorporated lands are classified as Local Responsibility Areas. Therefore, the General Plan EIR determined there would be no impacts from wildfire.

Addendum Analysis
The proposed project would update the Zoning Code for consistency with the 2035 General Plan in addition to implementing several GPAs. The zone changes would have no impact on the total residential or non-residential buildout analyzed in the Cumulative Impacts section of the General Plan EIR, as they are intended to bring the zone changes in line with the General Plan. However, the various GPAs would lead to an increase in the total number of residential units and non-residential square footage in the city. This total would still be within the Cumulative Buildout totals that were previously analyzed in the General Plan EIR. The proposed project would update but not eliminate the fundamental regulations and requirements of the Zoning Code, such as meeting design standards. Policies and actions in the 2035 General Plan that were referenced in the General Plan EIR would reduce impacts to the greatest extent possible. Additionally, General Plan Goal 8.C and Policies 8.C.1 through 8.C.5, which aim to minimize the risk of loss of life, injury, and damage to property and watershed resources resulting from fire hazards, would be applicable to future development facilitate by the project. These policies and actions would continue to be required with implementation of the Zoning Code Update. In addition, the most recent CAL FIRE maps indicate no substantive change from the General Plan EIR to FHSZ areas in or adjacent to

Page 580 ends

City of Woodland
City of Woodland Zoning Code Update

48 the town of Woodland (CAL FIRE 2024). The nearest VHFSZ in a State Responsibility Area (SRA) is located approximately 12.6 miles west of the City of Woodland.

While the proposed project would update both the Zoning Code and the 2035 General Plan, the new buildout of all sites undergoing a change would fall within the buildout numbers that were previously analyzed, thereby resulting in the same wildfire impacts from new development as evaluated in the certified EIR. In addition, the proposed project would not result in increased density or more development than was envisioned in the General Plan.

The Zoning Code Update, in and of itself, does not propose specific projects but aligns the zoning code to match the General Plan. Because it is a regulatory update, the Zoning Code Update would not, in and of itself, result in impacts to wildfire such as impairing an adopted emergency plan, exacerbate wildfire risks, expose people or structures to significant risk.

Future development facilitated by the Zoning Code Update would undergo project-specific developmental review, including design review, and would be subject to adopted development standards.

Conclusion
The Zoning Code Update would not result in impacts beyond those addressed or analyzed in the General Plan EIR nor present new information that shows impacts would be more significant than those described in the General Plan EIR. Therefore, the General Plan EIR applies to the Zoning Code Update and no additional environmental assessment of wildfire is required.

Page 581 ends

Conclusion

Addendum Evaluation 49
7 Conclusion
The City of Woodland, acting as the lead agency, has determined that an addendum to the certified EIR is the appropriate environmental document under CEQA because the proposed project would not require revisions to the certified General Plan EIR due to the involvement of new significant environmental effects or substantial increases in the severity of significant effects previously identified in the General Plan EIR.

There are no changed circumstances or new information that meet the standards requiring further environmental review under CEQA Guidelines Section 15162. Thus, these circumstances and information would not result in new or more severe impacts beyond what were addressed in the General Plan EIR and would not meet any other standards under CEQA Guidelines Section 15162(a)(3). No additional analysis is required based on the discussions throughout this addendum. The proposed Zoning Code Update would not involve development in areas not assumed for development in the General Plan EIR, nor would it result in population growth and density beyond what was analyzed in the General Plan EIR.

The project would not result in significant or substantially more severe impacts that were not discussed in the General Plan EIR. Also, there are no previously identified significant effects which, as a result of substantial new information that was not known at the time of the previous environmental review, would be substantially more severe than discussed in the General Plan EIR. Accordingly, no additional CEQA review is required.

CEQA Guidelines Section 15164 states that “[t]he lead agency or a responsible agency shall prepare an addendum to a previously certified EIR if some changes or additions are necessary but none of the conditions described in CEQA Guidelines Section 15162 calling for preparation of a subsequent EIR have occurred.” An addendum is therefore appropriate because, as explained above, none of the conditions calling for preparation of a subsequent EIR have occurred.

Page 582 ends

City of Woodland
City of Woodland Zoning Code Update

50 8 References

8.1 Bibliography
California Department of Forestry and Fire Protection (CAL FIRE). 2024. Fire Hazard Severity Zone Viewer. https://calfire-
forestry.maps.arcgis.com/apps/webappviewer/index.html?id=988d431a42b242b29d89597ab69 3d008 (accessed April 2024).

Woodland, City of. 2016. 2035 General Plan and Climate Action Plan Public Review Draft Environmental Impact Report. https://www.cityofwoodland.gov/DocumentCenter/View/1184/Public-Review- Draft-Environmental-Impact-Report-PDF (accessed April 2024). ______. 2017. City of Woodland 2035 General Plan. May 16, 2017. https://www.cityofwoodland.gov/DocumentCenter/View/1180/Final-General-Plan-May-16- 2017-PDF (accessed April 2024).

8.2 List of Preparers
Rincon Consultants, Inc. prepared this Addendum under contract to the City of Woodland. Persons involved in data gathering analysis, project management, and quality control are listed below.

Rincon Consultants, Inc.

Matt Maddox, AICP, Principal-in-Charge
Katherine Green, AICP, Senior Planner/Project Manager
Antonia Davetas, Environmental Planner

Page 583 ends

TO: THE HONORABLE MAYOR AND CITY COUNCIL
AGENDA: City Council Regular Meeting
DATE: June 18, 2024
ITEM #: G.7
SUBJECT: Appoint Members to various Boards and
Commissions

Recommendation for Action: Staff recommends that the City Council appoint members to the various Boards and Commissions for specified terms, consistent with the recommendations of the Mayor and Mayor Pro Tempore.

Staff Contact:

Ana B. Gonzalez, MMC, City Clerk, (530) 661-5806, [email protected]

Background
As has been customary, earlier this spring, the City conducted its annual Board and Commission recruitment, with appointments to be made by the City Council prior to July 1st of this year.

Staff kicked-off the recruitment for 2024 appointments in March, with the application period for candidates open from March through May 24th. Applications were received to fill current and prospective vacancies.

Once all applications were received, the Mayor and Mayor Pro Tempore were tasked with reviewing the applications and advancing nominations for consideration by the full Council for 2024 appointments.

Discussion
After a review of the applications received from individuals interested in serving on city Boards and Commissions, Mayor Garcia-Cadena and Mayor Pro Tempore Lansburgh are recommending appointments as contained in the attachment to this staff report. It is also recommended that those candidates who are not appointed by the Council to vacant seats be retained as a pool of candidates for appointment for any vacancies that remain or may arise prior to next year's Board and Commission recruitment period.

Conclusion:

Staff recommends that the City Council appoint members to the various Boards and Commissions, for specified terms, consistent with the recommendations of the Mayor and Mayor Pro Tempore.

Prepared by: Ana B. Gonzalez, MMC, City Clerk

Page 584 ends

Attachments:

1. Recommended Appointments effective July 1, 2024

Page 585 ends

BOARDS AND COMMISSIONS

RECOMMENDED APPOINTMENTS
EFFECTIVE JULY 1, 2024

RECOMMENDED

MEMBER APPOINTMENT TERM EXPIRES
Commission on Aging
Dan Rubin New 4-yr term 6/30/2028
Manufactured Home Fair Practices Commission
Dick Cronin Re-appoint 3-yr term 6/30/2027
Parks & Recreation Commission
Adam Kirchgessner New 4-yr term 6/30/2028
Planning Commission
Marco Lizarraga Re-appoint 4-yr term 6/30/2028
Lucy Roberts New 4-yr term 6/30/2028
Sustainability Advisory Committee
Rolf Frankenbach Re-appoint 4-yr term 6/30/2028
Craig Perrin New 4-yr term 6/30/2028

Page 586 ends

TO: THE HONORABLE MAYOR AND CITY COUNCIL
AGENDA: City Council Regular Meeting
DATE: June 18, 2024
ITEM #: G.8
SUBJECT: Letter Agreement to Amend Franchise Agreement
with USA Waste of California, Inc. dba Waste
Management of Woodland (WM)

Recommendation for Action: Staff recommends that the City Council adopt Resolution No. _____, authorizing the City Manager to execute a Letter Agreement to Amend Franchise Agreement with USA Waste of California, Inc. dba Waste Management of Woodland (WM).

Staff Contact:

Rosie Ledesma, Environmental Resources Program Manager, (530) 661-2059, [email protected]

Fiscal Impact:

The City of Woodland will receive a one-time payment of $1,350,000 within 60 days of executing the Letter Agreement with an additional $1,350,000 if a Replacement Agreement is executed. WM will also provide payment of $250,000 to cover City costs associated with negotiations.

Background:

The City of Woodland and USA Waste of California, Inc. dba Waste Management of Woodland (WM) previously entered into a Franchise Agreement dated July 1, 2011, which was last amended and restated on October 18, 2017, and set to expire on December 31, 2025. The Franchise Agreement permits WM to provide exclusive waste, recycling, organics, and street sweeping services to the Woodland community at structured rates accepted by City Council. The Franchise Agreement also provides franchise fee payments to the City to support waste reduction and recycling programs mandated by AB 939 and SB 1383 as well as payments to the general fund to support infrastructure maintenance and stormwater mitigation associated with the services provided by WM.

In February 2024, the City engaged a third-party consultant, R3, to conduct an audit of WM’s performance under the Franchise Agreement. The audit identified certain issues and areas of concern regarding WM’s service under the Franchise Agreement and recommended the City assess fines or liquidated damages for past occurrences relating to missed services and work order response times. It also identified recent improvements and a strong operational structure that should provide the City with a safe, effective, and efficient collection system.

Discussion:

The City of Woodland presented WM with the findings of the performance audit in March 2024. In response, WM developed a plan to remediate past issues and address the areas of concern. WM has also begun taking action on certain operations effective immediately.

After several discussions with WM, the City of Woodland and WM wish to further amend the Franchise Agreement set forth in a Letter Agreement that stipulates the following actions:
• Extend the current Franchise Agreement twelve months to December 31, 2026 • Allow the City and WM to exclusively negotiate a Replacement Agreement by or before June 30, 2025.

Page 587 ends

• WM will provide the City with $250,000 to cover City costs associated with the negotiation of the Replacement Agreement with any unspent funds to be used at the City’s discretion. • In exchange for assessing fines or liquidated damages, WM will make a one-time payment of $1,350,000 within 60 days of executing the Letter Agreement and an additional payment of $1,350,000 if a Replacement Agreement is executed.
• WM will establish a customer service center in Lodi, CA with service representatives specifically assigned and trained to support Woodland residents and businesses. WM agrees to place a service representative at the Woodland office if at any time the City finds WM’s customer service to be inadequate.
• WM will commit to implementing improvements to services, outreach, and reporting in accordance to the Public Outreach Plan defined in Attachment A of the Letter Agreement, as well as ensure that street sweeping meets the City’s expectations. WM will also conduct additional informal performance reviews during the extension and incorporate expanded formal performance reviews within the Replacement Agreement.

Conclusion:

Staff recommends that the City Council adopt Resolution No. _____, authorizing the City Manager to execute a Letter Agreement to Amend Franchise Agreement USA Waste of California, Inc. dba Waste Management of Woodland (WM).

Prepared by: Rosie Ledesma, Environmental Resources Program Manager

Attachments:

1. Final Letter Agreement (WM 6-10-24)

2. Resolution - WM Letter Agreement

Page 588 ends

LETTER AGREEMENT TO AMEND FRANCHISE AGREEMENT

This Letter Agreement is entered between the City of Woodland (City) and USA Waste of California, Inc. dba WM of Woodland (WM). The City and WM previously entered into that certain Amended and Restated Agreement Between the City of Woodland and USA Waste of California, Inc. dba Waste Management of Woodland, for Solid Waste, Recyclables, Green Waste, and Street Sweeping Services, dated July 1, 2011 as amended (“Franchise Agreement”). The parties agree that the copy of the Franchise Agreement and amendments currently on file with the City Clerk is the controlling version of the Franchise Agreement which expires on December 31, 2025. The parties wish to further amend the Franchise Agreement as set forth in this Letter Agreement and outlined below:

A. From the date of this Letter Agreement through June 30, 2025, WM and City shall exclusively negotiate regarding a new franchise agreement or an extension of the Franchise Agreement (in either case, the “Replacement Agreement”). The City shall not issue a request for proposals during such time period. If a Replacement Agreement has not been executed by June 30, 2025, the City may unilaterally extend the Franchise Agreement until December 31, 2026 with written notice to WM. Within 30 days of the full execution of this Letter Agreement, WM shall pay the City $250,000 to support its costs associated with the negotiation of a Replacement Agreement. In the event that the City spends less than the $250,000, the City may use any excess funds for their own discretion. If the costs associated with negotiation exceed $250,000, the City will be responsible for any additional costs.

B. In February 2024, the City engaged a third -party consultant, R3, to conduct a performance audit of WM’s performance under the Franchise Agreement. Following the performance audit the City issued a March 14, 2024 letter to WM identifying certain issues and areas of concern regarding WM’s service under the Franchise Agreement (“City Letter”). In order to resolve the issues identified in the City Letter efficiently and without the need for the City to assess fines or liquidated damages, WM shall make a one -time payment of $1,350,000 to City within sixty (60) days of fully executing this Letter Agreement. Additionally, if , and only if, the City and WM execute a Replacement Agreement, WM shall pay the City an additional $1,350,000 within sixty (60) days of fully executing the Replacement Agreement.

C. In addition to the requirements of Section 5.1.10 of the Franchise Agreement, WM shall provide service personnel dedicated to servicing Woodland customers at WM’s customer service center located in Lodi, California. Such service personnel shall be assigned and trained to answer questions from Woodland residents and businesses and be familiar with the terms of WM’s service in the City. If at any time during the term of the Franchise Agreement City finds WM’s customer service to be inadequate, WM shall agree to place a service representative at WM’s Woodland office.

D. Without limiting its obligation in Section 4.5 of the Franchise Agreement , WM shall ensure that street sweeping meets the City’ s expectations, and WM shall provide such services through a subcontractor approved by the City Manager.

E. WM shall commit to implementing improvements to services, outreach, and reporting in accordance to the Outreach Plan as defined in Attachment A. Reasonable adjustments

Page 589 ends

2 to the Outreach Plan may be made as needed and accepted by City staff. Any failure to comply with the Outreach Plan shall be deemed a breach of the Franchise Agreement.

F. WM shall cooperate with City in conducting informal annual performance reviews during the extended term of this Franchise Agreement as set forth in paragraph A. Any finding s in such audits shall be subject to the applicable terms of the Franchise Agreement. WM a nd City agree to incorporate an expanded formal performance review process within the Replacement Agreement.

G. Except as set forth in this Letter Agreement, the Franchise Agreement remains in full force and effect.

AGREED AND ACCEPTED:

_________________________

USA WASTE OF CALIFORNIA, INC.

_________________________

CITY OF WOODLAND

Page 590 ends

3 ATTACHMENT A

Page 591 ends

4

Page 592 ends

RESOLUTION NO. ________

A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF WOODLAND

AUTHORIZING CITY MANAGER TO EXECUTE A LETTER AGREEMENT TO AMEND

FRANCHISE AGREEMENT WITH USA WASTE OF CALIFORNIA, INC

DBA WM OF WOODLAND
WHEREAS, the City of Woodland (“City”) and USA Waste of California, Inc. dba WM of Woodland (“WM”) previously entered into a Franchise Agreement dated July 1, 2011 that is set to expire on December 31, 2025; and
WHEREAS, the City engaged a third-party consultant to conduct a performance audit of WM’s performance under the Franchise Agreement identifying certain issues and areas of concern; and WHEREAS, WM has committed to making improvements to its operations and services by making changes to its customer service operations, street sweeping management, and by adhering to a public outreach plan outlined in the Letter Agreement; and WHEREAS, the City and WM wish to amend the Franchise Agreement through a Letter Agreement to exclusively negotiate a Replacement Agreement by June 30, 2025 with the option to extend the Franchise Agreement until December 31, 2026; and
WHEREAS, in lieu of applying liquidated damages or fines recommended in the performance audit, WM will provide the City a one-time payment of $1,350,000 upon execution of the Letter Agreement, $250,000 to support costs associated with negotiations, and an additional $1,350,000 when and if a Replacement Agreement is executed.

NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Woodland hereby authorizes the City Manager to execute a Letter Agreement to Amend Franchise Agreement with WM.

PASSED AND ADOPTED by the City Council of the City of Woodland at a regular meeting of the City Council held on the 18th day of June 2024, by the following vote:

AYES:

NOES:

ABSENT:

ABSTAIN:
______________________________________
Tania Garcia-Cadena, Mayor
ATTEST:
________________________________
Ana B. Gonzalez, City Clerk

Page 593 ends

TO: THE HONORABLE MAYOR AND CITY COUNCIL
AGENDA: City Council Regular Meeting
DATE: June 18, 2024
ITEM #: G.9
SUBJECT: Approval of Memorandum of Understanding - MMPA and PMMA

Recommendation for Action: Staff recommends that the City Council (1) Adopt Resolution No. _____, ratifying a two-year, Memorandum of Understanding with the Woodland Mid-Management Professional Association (MMPA) covering the period from July 1, 2024, through June 30, 2026, and (2) adopt Resolution No. _____, ratifying a two-year Memorandum of Understanding with the Woodland Police Mid-Management Association (PMMA) covering the period of July 1, 2024, through June 30, 2026.

Staff Contact:

Kim McKinney, Administrative Services Director, (530) 661-5849, [email protected]

Fiscal Impact:

The current labor agreement with the Woodland Mid-Management Professional Association (MMPA) covers salary and benefits for 47 full-time equivalent positions at an annual cost of approximately $9.2 million. The terms of the proposed new two-year agreement are expected to result in an average annual increase of approximately 3% of total compensation. This increase will add $1.4 million in total employee compensation costs over the two-year period and is within the expenditure levels assumed in the development of the FY2024/25 budget and forecast. About 30% of this bargaining group is funded by the General Fund, with the balance funded by various enterprise and special revenue funds.

The current labor agreement with the Woodland Police Mid-Management Association (PMMA) covers salary and benefits for 4 full-time equivalent positions at an annual cost of approximately $1.4 million. The terms of the proposed new two-year agreement are expected to result in an average annual increase of approximately 3% of total compensation. This increase will add $190,000 in total employee compensation costs over the two-year period and is also within the expenditure levels assumed in the development of the FY2024/25 budget and forecast. All employees in this bargaining group are funded by the General Fund.

Background:

The current labor agreements between the City and MMPA and between the City and PMMA expire on June 30, 2024. In anticipation of this, the City began negotiating with both groups on a successor labor agreement in February 2024, and reached tentative agreements in May. The tentative agreements were presented to and ratified by each respective group's membership, and tonight’s recommended Council action would formally ratify the terms of both of the new two (2) year agreements with MMPA and with PMMA.

Discussion:

Mid-Management Professional Association
The proposed agreement provides for increases in salaries and costs of certain other benefits for employees while maintaining structural changes to the overall benefit package negotiated in prior agreements. The new contract provides changes reflecting anticipated cost of living adjustments and promoting retention and recruitment of employees.

Page 594 ends

The major terms of the new contract are as follows:

Cost of Living Adjustments:
• January 1, 2025 4%
• January 1, 2026 4%

Longevity Pay Changes:

Effective June 30, 2026, rather than paying a flat amount, longevity pay will be calculated on a monthly basis and paid biweekly, based on a percentage of base pay, as follows:
10 years of service 1.0% of base pay
15 years of service 1.5% of base pay
20 years of service 2.0% of base pay

Medical Health Insurance:

No adjustment to the City's contribution towards health insurance over the two-year term.

Police Mid-Management Association
The proposed agreement provides for increases in salaries and costs of certain other benefits for employees while maintaining structural changes to the overall benefit package negotiated in prior agreements. The new contract also provides for ongoing stability in medical insurance rates, while at the same time providing adjustments reflecting anticipated cost of living adjustments and promoting retention and recruitment of employees.

The major terms of the new contract are as follows:

Cost of Living Adjustments:
• July 1, 2024 2%
• July 1, 2025 1%
• January 1, 2026 2%

Certificate Pay Changes:

Effective July 2024, certificate pay allowable for members of the PMMA will be adjusted, and overall available certificate pay will increase from the current maximum of 10% to a new maximum of 11.5% of base pay. The adjustments to certificate pay are as follows:

POST Supervisory Certificate: 2.5% 5%
POST Adv/Management Cert: 2.5% 4%
FBI/POST Command/Masters: 5% 2.5%

Medical Health Insurance:

The City's contribution to medical insurance premiums will increase by 3% in each year of the two- year contract.

Conclusion:

Staff recommends that the City Council (1) Adopt Resolution No. _____, ratifying a two-year, Memorandum of Understanding with the Woodland Mid-Management Professional Association (MMPA) covering the period from July 1, 2024, through June 30, 2026, and (2) adopt Resolution No. _____, ratifying a two-year Memorandum of Understanding with the Woodland Police Mid- Management Association (PMMA) covering the period of July 1, 2024, through June 30, 2026.

Page 595 ends

Prepared by: Kim McKinney, Administrative Services Director

Attachments:

1. MMPA MOU 2024 to 2026

2. PMMA MOU 2024-2026

Page 596 ends

MEMORANDUM OF

UNDERSTANDING
between the
City of Woodland
and the
Woodland
Mid-Management/
Professional Association
July 1, 2024 to June 30, 2026

Page 597 ends

MMPA
July 1, 2024 to June 30, 2026
2 RESOLUTION NO.

MEMORANDUM OF UNDERSTANDING

BETWEEN THE WOODLAND MID-MANAGEMENT PROFESSIONAL ASSOCIATION

AND THE CITY OF WOODLAND
The City of Woodland and the Woodland Mid-Management/Professional Association, representing employees employed by the City of Woodland in the classifications designated herein in Article I, Section I under the title “Application,” by and through their authorized representatives hereby ratify as and for a memorandum of understanding the attached Resolution entitled “A Resolution of the City Council of the City of Woodland Approving Certain Terms and Conditions for Mid-Management Unit Employees” including the exhibits appended hereto, and recommend that the Resolution shall be incorporated into the City’s adopted Personnel Rules and Regulations and thereafter the attached Resolution shall be used merely for purposes of interpreting the specific rules and regulations addressed. In resolving questions of interpretation, the Resolution shall be the primary source in all cases.

DATED: June 18, 2024
Representative of the Representative of the City of
Woodland Mid-Management/Professional Woodland
Association

Page 598 ends

MMPA
July 1, 2024 to June 30, 2026
3 RESOLUTION NO.

A RESOLUTION OF THE CITY COUNCIL OF THE

CITY OF WOODLAND APPROVING CERTAIN TERMS AND CONDITIONS FOR

MID MANAGEMENT UNIT EMPLOYEES
Table of Contents
ARTICLE I .....................................................................................................................................................................6 GENERAL PROVISIONS .........................................................................................................................................6

1.1 Application....................................................................................................................................................6

1.2 Term and Compensation Study...................................................................................................................10 ARTICLE II..................................................................................................................................................................10 COMPENSATION ...................................................................................................................................................10

2.1 Salary (Modified July 2024) .......................................................................................................................10

2.2 Uniforms .....................................................................................................................................................10

2.3 Longevity Pay (Modified July 2024)..........................................................................................................10

2.4 Promotional Pay..........................................................................................................................................11

2.5 Out of Class Work ......................................................................................................................................11

2.6 Administrative Leave..................................................................................................................................11

2.7 Bilingual Pay...............................................................................................................................................12

2.8 Jury Duty.....................................................................................................................................................12

2.9 Library Sunday Hours.................................................................................................................................12

2.10 Deferred Compensation .............................................................................................................................12 ARTICLE III.................................................................................................................................................................13 EDUCATION INCENTIVE.....................................................................................................................................13

3.1 Professional Growth Incentive) ..................................................................................................................13 ARTICLE IV ................................................................................................................................................................14 MEDICAL AND RELATED BENEFITS................................................................................................................14

4.1 Medical Insurance.......................................................................................................................................14

4.2 Medical Insurance Upon Retirement ..........................................................................................................15

4.3 Dental Insurance .........................................................................................................................................18

4.4 Long Term Disability Insurance .................................................................................................................18

4.5 Vision Insurance .........................................................................................................................................18

4.6 Life Insurance .............................................................................................................................................18

4.7 Flexible Spending Account.........................................................................................................................18

4.8 Reopener on Medical Insurance Upon Retirement.....................................................................................18 ARTICLE V..................................................................................................................................................................18 LEAVES ...................................................................................................................................................................18

5.1 Holidays ......................................................................................................................................................18

5.2 Vacation Leave ..........................................................................................................................................19

Page 599 ends

MMPA
July 1, 2024 to June 30, 2026
4 5.3 Sick Leave...................................................................................................................................................20

5.4 Catastrophic Illness or Injury......................................................................................................................20 ARTICLE VI ................................................................................................................................................................20 RETIREMENT .........................................................................................................................................................20

6.1 Retirement...................................................................................................................................................20 ARTICLE VII ...............................................................................................................................................................21 WORKING CONDITIONS......................................................................................................................................21

7.1 Work Hours.................................................................................................................................................21

7.2 Contracting Out...........................................................................................................................................21

7.3 Introduction of New Technology................................................................................................................21

7.4 Association Leave.......................................................................................................................................22

7.5 Other Working Conditions Not Set Forth Herein.......................................................................................22 ARTICLE VIII..............................................................................................................................................................22 OTHER COMPENSABLE ITEMS NOT SET FORTH HEREIN...........................................................................22

8.1 Other Compensable Items not set Forth Herein..........................................................................................22 APPENDIX A)..............................................................................................................................................................23 SALARY SCHEDULE EFFECTIVE JULY 1, 2024...............................................................................................23

Page 600 ends

MMPA
July 1, 2024 to June 30, 2026
5 ARTICLE I

GENERAL PROVISIONS

1.1 Application

1.1.1 This Resolution applies to employees in the following classifications and ranges:

Accountant I 116
Accountant II 120
Assistant Engineer 125
Assistant Planner 118
Associate Civil Engineer 131
Associate Engineer 127
Associate Planner 124
Building Inspection Services Manager 132
Business Engagement/Resource Conservation Program
Manager 124
Chief Building Official 140
Chief Collection Systems Operator 132
Chief Information Officer 142
Chief Plant Operator 132
Chief Project Engineer 145
Chief Water Systems Operator 132
Children's Librarian II 118
City Engineer 145
Communications and Strategic Policy Manager 134
Community Services Program Manager 125
Construction Project Manager 129
Data Services Manager 136
Economic Development Manager 136
Electrical / Signs & Markings Supervisor 134
Environmental Resources Analyst 127
Environmental Sustainability Manager 131
Finance Officer 141
Financial Services Manager 136
Fleet & Facilities Manager 131
GIS Coordinator 132
Housing Analyst I 120
Housing Analyst II 124
Human Resources Analyst I 121
Human Resources Analyst II 126
Human Resources Manager 140

Page 601 ends

MMPA
July 1, 2024 to June 30, 2026
6 Infrastructure O & M Superintendent 132
Junior Engineer 121
Junior Planner 113
Laboratory & Environmental Compliance Mgr. 129
Laboratory Supervisor 127
Library Program Manager I 122
Library Program Manager II 125
Management Analyst I 120
Management Analyst II 125
Marketing & Business Rel Spec 118
Office Manager 115
Operations and Maintenance Superintendent 137
Park Planner 132
Park Superintendent 132
Planning Manager 140
Principal Civil Engineer 141
Principal Planner 136
Principal Utilities Civil Engineer 141
Public Works O&M Infrastructure Admin 141
Purchasing Manager 123
Recreation Superintendent 131
Redevelopment Manager 136
Senior Accountant 125
Senior Associate Civil Engineer 134
Senior Center Manager 120
Senior Civil Engineer 138
Senior Construction Project Manager 131
Senior Environmental Resources Analyst 131
Senior Human Resources Analyst 132
Senior Management Analyst 131
Senior Planner 132
Social Services Manager 132
Sports Manager 125
Technical Services Manager 136
Transportation Engineer 134
Treatment Plant Superintendent 137
Utilities Administrator 141
Wastewater Systems Administrator 141
Water Pollution Control Facility Superintendent 141
Water Systems Administrator 141

Page 602 ends

MMPA
July 1, 2024 to June 30, 2026
7 1.2 Term and Compensation Study

1.2.1 Except where the context otherwise determines or otherwise provides, the provisions of this Resolution shall apply from the first full pay period after Association ratification and adoption of the agreement by the City Council on its regular agenda consistent with the Brown Act through June 30, 2026.

1.2.2 The City and the Association will meet to discuss the need to conduct an analysis of benchmark city selection and a compensation study prior to the start of negotiations.

ARTICLE II

COMPENSATION

2.1 Salary (Modified July 2024)

2.1.1 Salary schedules for unit classifications shall be increased by as follows:
•January 1, 2025: 4.0%
•January 1, 2026: 4.0%

2.2 Uniforms

2.2.1 Represented employees required by their Department Director to wear a uniform shall, at the Departments Director's discretion, be provided with the uniform and corresponding laundry service for the uniform. Employees required by their Department Director to wear safety boots shall be entitled to up to a maximum of $100.00 per fiscal year to purchase a replacement pair upon written evidence of purchase of acceptable safety boot determined by the Department.

2.3 Longevity Pay (Modified July 2024)

2.3.1 The City shall pay longevity pay according to the following schedule on a monthly basis.

Length of Service Annual Amount Monthly Amount 10 years $ 600 $ 50.00
15 years $ 900 $ 75.00
20 years $1,200 $100.00
Effective June 30, 2026, the City stall pay longevity pay according to the following schedule, on a biweekly basis:

Length of Service Percentage of Pay
10 years 1.0% of base pay
15 years 1.5% of base pay
20 years 2.0% of base pay

Page 603 ends

MMPA
July 1, 2024 to June 30, 2026
8 2.4 Promotional Pay

2.4.1 The City agrees that all promotions within the unit shall result in a minimum five percent (5%) increase in pay for the affected employee.

2.5 Out of Class Work

2.5.1 Assignment to perform work of a higher-level classification Employees assigned by their supervisor to perform the essential duties of a higher-level classification shall receive an additional five percent (5%) of base pay as out of class compensation. In the case of assignment, the minimum period of time to be eligible for out of class work pay must be twenty-four (24) consecutive work hours (3 days). Payment shall continue for the term of the assignment to the higher-level classification duties. Assignments shall be limited to six (6) months, which may be extended on approval of the City Manager.

2.5.2 Assignment as Acting Department Head In the case of assignment as an acting department head, the minimum period of time to be eligible for acting pay must be twenty-four (24) consecutive work hours (3 days). The compensation shall be an additional ten percent (10%) of the base pay. Payment shall continue for the term of the assignment to the higher- level classification duties. Acting assignments shall be limited to six (6) months, which may be extended on approval of the City Manager.

2.5.3 Assignment of duties beyond the scope of employee’s classification: Employees assigned to perform significant and additional duties outside the scope of their job description shall receive an additional five percent (5%) of base pay as special assignment pay. In the case of assignment, the minimum period of time to be eligible for out of class work pay must be twenty-four (24) consecutive work hours (3 days).

2.5.4 No simultaneous pay: Employees may not receive more than one out of class pay under this provision at a time.

2.6 Administrative Leave

2.6.1 Each represented employee shall receive an annual bank of ninety-six (96) hours administrative leave on July 1 of each year. This administrative leave shall be in addition to accrued vacation leave and other leaves provided by the City.

Administrative leave shall be subject to the same rules for usage and accounting as vacation leave with the following exceptions:
•Each employee may, at his/her request, have up to forty (40) unused hours of the bank paid directly to him/her at their hourly rate of pay in effect at the time of the request.
•No employee may carry over any balance past June 30 each year.

2.6.4 It is recognized that in some instances unit employees may be required to work extraordinarily long hours on special projects or unique circumstances. Should such an extraordinary occasion arise, the Department Director may recommend to the City

Page 604 ends

MMPA
July 1, 2024 to June 30, 2026
9 Manager that the employee be granted additional Administrative Leave in addition to the 96 hours already provided subject to the following provisions:

2.6.4.1 Additional Administrative Leave hours granted cannot exceed 24 hours in any Fiscal Year.

2.6.4.2 Additional Administrative Leave hours must be approved by the Personnel Officer and specifically authorized by the City Manager.

2.6.4.3 Additional Administrative Leave shall not be construed to constitute overtime compensation nor be applied on an hour for hour basis.

2.6.5 Employees terminating prior to January 1 of any fiscal year shall be responsible for repaying a prorated share of Administrative Leave credited to them on July 1. For example, an employee working 25% of the year would owe the City 60 hours of Administrative Leave. If more than 20 hours of Administrative Leave had already been taken in time off or cash, at the time of termination, the employee would be responsible for payment of the balance of the hours due in either vacation leave or in cash. Cash payment would be made at the current rate of pay.

2.7 Bilingual Pay

2.7.1 Designated bilingual employees shall receive additional compensation above their regular salary at a rate equal to Two Hundred Dollars ($200) per month, paid biweekly.

2.8 Jury Duty

2.8.1 Employees shall be entitled to receive full pay in addition to any compensation received for serving as a member of a jury. This does not include Grand Jury duty.

2.9 Library Sunday Hours

2.9.1 Tenured Librarians shall not be required to work on Sundays more frequently than one Sunday in four.

2.9.2 If the Librarian scheduled to work on a Sunday is unable to work (illness or approved absence), then no other Librarian shall be required to change his/her schedule to cover that absence unless (1) approved by the Library Services Director and (2) the Librarian is agreeable to work that Sunday.

2.10 Deferred Compensation
The City of Woodland will match an individual’s deferred compensation contribution up to three percent (3%) of the individual’s base salary as reflected in Appendix A. Only plans approved by the City in its deferred compensation program will be eligible for City contribution. At the time of this contract ratification, the City offers three deferred compensation providers from which employees may select. Individual employees will be responsible to ensure their contribution and the City’s matching contribution meet Internal Revenue Code Section 457 deferred compensation program requirements. In addition, as their salary is adjusted, individual employees will be responsible to make periodic changes to the amounts of compensation deferred.

Page 605 ends

MMPA
July 1, 2024 to June 30, 2026
10 ARTICLE III

EDUCATION INCENTIVE

3.1 Professional Growth Incentive)

3.1.1 Employees covered by this Resolution are eligible to participate in the Professional Growth Incentive Program. Employees may receive a reimbursement for professional memberships (including licenses, applications and renewal fees), subscriptions, professional training, attainment of academic degrees and related fees, and equipment limited to desktop computers or components (memory, hard drives, video cards, power supplies, mother boards), keyboards, monitors (maximum 32 inches), computer mouse(s)/pointing devices, laptop/notebook/tablet computers, printers, City standard suite of office productivity software (currently Microsoft Office Suite), security software, videoconferencing cameras and microphones, and cellular phones and related charging accessories, unless considered used mostly for personal entertainment. Smart watches and wireless earbuds are not eligible for reimbursement under this section. All such requests require advance approval by the City. Reimbursement per fiscal year per employee shall be $625.00. In the event that the full reimbursement amount is not used in any fiscal year, the amount will carry over to the next fiscal year. Under no circumstances will an employee be eligible to carry over more than $625.

3.1.2 Employees terminating prior to January 1 of any fiscal year shall be responsible for repaying a prorated share of Professional Reimbursement they have spent. For example, an employee working 25% of the year would be entitled to a Professional Reimbursement not to exceed, $156.25. If employee received a reimbursement of greater than $156.25, at the time of termination, the employee would be responsible for payment of the difference. This will be taken out of the employee’s final check. If there is not enough funds to cover this amount, the City will invoice the employee for the difference. Funds carried over from a previous fiscal year are not subject to proration.

ARTICLE IV

MEDICAL AND RELATED BENEFITS

4.1 Medical Insurance

4.1.1 The City shall make available to all unit employees, the CalPERS medical insurance program. Employees shall have the option of enrolling in any of the plans provided by CalPERS.

4.1.2 For Employees hired before October 26, 2006, the City provides a two tier medical benefits program:
•Tier One: Employee Only and Employee plus One
•Tier Two: Employee plus Family

Page 606 ends

MMPA
July 1, 2024 to June 30, 2026
11 4.1.2.1 Employees hired before October 26, 2006 who provide proof of dual coverage under PERS or other medical insurance programs may decline to accept medical coverage. These employees shall be eligible for a payment of $ 405 per month.

January 1 Employee
plus One
Employee plus
Family
2025 $1,689.07 $2,195.79
2026 $1,689.07 $2,195.79

4.1.3 The City shall make available to all unit employees, a medical insurance program through CalPERS or a program which offers a quality and variety of plans at least equivalent to the medical insurance program offered by CalPERS. Employees shall have the option of enrolling in any of the plans.

4.1.4 For all benefited Employees, the City provides a three tier medical benefits program:
•Tier One: Employee Only
•Tier Two: Employee plus One
•Tier Three: Employee plus Family

4.1.5 Employees who provide proof of dual coverage under PERS or other medical insurance programs may decline to accept medical coverage. These employees shall be eligible for a payment of $405 per month.

4.1.6 The City shall contribute up to the following amounts towards employee medical insurance coverage and cafeteria plan benefit:

January 1 Employee
Only
Employee
plus One
Employee plus
Family
2025 $844.54 $1,689.07 $2,195.79
2026 $844.54 $1,689.07 $2,195.79

4.2 Medical Insurance Upon Retirement

4.2.1 Employees who retire from the City may be eligible for Medical Insurance in accordance with the CalPERS Medical Plan. Dental, Vision and Long-Term Disability Insurance is not provided to retirees.

4.2.2 For employees who were hired before July 1, 2006, with ten (10) or more years of service with the City of Woodland, who either retire and are eligible to receive benefits under the City's PERS plan or retire for disability under PERS shall be eligible for continued health and life insurance coverage subject to the following terms and conditions:

4.2.2.1 Employees 50 years old or older who separate from City service but postpone application to receive PERS retirement benefits must pay the premiums for any continued insurance coverage until the application for benefits is approved;

4.2.2.2 Retirees who are eligible for Medicare must enroll in Medicare or lose City Benefits as allowed by PEMHCA.

Page 607 ends

MMPA
July 1, 2024 to June 30, 2026
12 4.2.2.3 The parties agree that upon written notification by the City to the Association, the City and the Association agree to meet and confer through the impasse process to negotiate the City’s contribution related to Medicare eligible retirees.

4.2.2.3.1 Retirees who were hired prior to July 1, 2006, have a vested right to receive full medical insurance benefits in retirement equal to the total medical benefit provided to active employees. In the immediate case, such retirees shall receive the combined value of the medical benefit and the cafeteria plan benefit to equal the total benefit. In future cases, should the City again restructure its health care benefits, such retirees shall continue to receive the full value provided to active employees for health benefits irrespective of how they may subsequently be structured.

4.2.2.4 Life Insurance will be continued with the same benefit level and conditions as active employees except as adjusted according to the schedule outlined in the City's "Life Insurance Outline of Benefits" or in any modifications or other plans that replace the current plan.

4.2.2.5 Health Insurance coverage will be coordinated with Medicare when retirees become eligible. and

4.2.2.6 Dental, Vision and Long-Term Disability Benefits will not be offered or provided to retirees.

4.2.3 Employees who were hired on or after July 1, 2006, and have ten (10) or more years of service with the City of Woodland who either retire and are eligible to receive benefits under the City's PERS plan or retire for disability under PERS shall be eligible for continued health and life insurance coverage subject to the following terms and conditions will receive medical insurance benefits in retirement as follows:

4.2.3.1 Insurance benefits levels to retirees who were hired after July 1, 2006, will receive a benefit equal only to the Public Employees’ Medical and Hospital Care Act ( PEMHCA) Medical Benefit.

4.2.3.2 Retirement Health Savings Plan. The City of Woodland has established a program in which employees participate to save, on a tax deferred basis, money to help pay the cost of healthcare once an individual retires. The Retirement Health Savings Plan (RHSP) may be used for medical, dental and vision care as well as other healthcare expenses.

4.2.3.2.1 For employees hired on or after July 1, 2006, participation in the City’s RHSP is mandatory.

4.2.3.2.2 Contributions: The City shall contribute $100 per month to the employee’s RHSP account; the employee shall contribute $50 per month to their RHSP account. These contributions shall start after an employee has successfully completed their initial probationary period. However, upon successful completion of probation, the City shall contribute a lump sum of $100 per month for each month served in the employee’s initial probation.

Page 608 ends

MMPA
July 1, 2024 to June 30, 2026
13 4.2.3.2.3 Initial Probationary Period. During an employee’s initial probationary period with the City, neither the employee nor the City shall contribute to the employee’s RHSP account. The initial probationary period is that probationary period when an employee is first hired. A probationary period is also in effect when an individual changes classification or is promoted to a higher classification; City and employee contributions to RHSP accounts will continue during such promotional probationary periods.

4.2.3.2.4 Conversion of Sick Leave. Once an employee has accrued 500 hours of sick leave, the City shall convert 50% of additional sick leave earned to a cash contribution to an employee’s RHSP account.

This results in all sick leave earned above 500 hours being changed to 4 hours per month (versus 8 hours) with the value of 4 hours of salary being contributed to the employee’s RHSP account. If accrued sick leave balance falls below 500 hours, the employee will once again accrue 8 hours of sick leave, until the sick leave accrued balance exceeds 500, then sick leave will be changed to 4 hours per month with the value of 4 hours of salary being contributed to the employee’s RHSP.

4.2.3.2.5 Employees hired prior to July 1, 2006, were provided, on a one-time, irrevocable basis, the opportunity to opt out of the City’s retiree medical plan (paragraph 4.2.2). Employees who selected this option shall continue to participate in the City’s retiree health savings plan under the terms set forth above in paragraph 4.2.3. For these employees, the City’s contribution is $250 per month and the employee’s contribution is $50 per month. At the employee’s option, any portion of this $250 City contribution may be paid into an approved deferred compensation plan.

Page 609 ends

MMPA
July 1, 2024 to June 30, 2026
14 4.3 Dental Insurance

4.3.1 The City shall maintain in effect the Dental Insurance Program for the term of this agreement.

4.4 Long Term Disability Insurance

4.4.1 The City shall continue to provide a long-term disability insurance plan for all represented employees with benefits equivalent to that provided by the current plan.

4.5 Vision Insurance

4.5.1 The City shall continue to provide employees covered by this Resolution with vision insurance benefits equivalent to that provided in the current plan.

4.6 Life Insurance

4.6.1 The City shall maintain in effect life insurance for represented employees in the amount of Fifty Thousand Dollars ($50,000.00).

4.7 Flexible Spending Account

4.7.1 The City will maintain in effect a qualified plan under Internal Revenue Code Section 125.

Such account shall provide for pre-tax treatment of employee obligations for medical and dependent care costs.

4.8 Reopener on Medical Insurance Upon Retirement

4.8.1 The parties agree to meet and discuss for the purpose of discussing options for reducing the City’s costs associated with funding of the current retiree medical benefits, with the shared goal of ensuring that full funding of retiree medical benefits is sustainable within the City’s long term financial plan. Any changes shall be by mutual agreement.

ARTICLE V
LEAVES

5.1 Holidays

5.1.1 City holidays to be observed by represented employees shall be:

January 1st
Third Monday in January (Martin Luther King's Birthday) Third Monday in February (Presidents Day)
Fourth Monday in May (Memorial Day)
July 4th
First Monday in September (Labor Day)
November 11th (Veteran's Day)
Thanksgiving Day

Page 610 ends

MMPA
July 1, 2024 to June 30, 2026
15 The Day after Thanksgiving Day
Christmas Eve – ½ day (observed last workday before Christmas) December 25th (Christmas Day)

5.1.2 In addition, each represented employee shall have 16 hours added to his/her vacation leave total as of July 1 each year.

An employee must work or be paid for all or part of both the employee’s regularly scheduled workday before and after a holiday to be eligible for that holiday.

5.1.3 Represented employees in permanent part-time positions shall receive pay for City holidays on a pro-rata basis regardless of whether they are scheduled to work holiday or not. The pro-rata holiday benefit to be received shall be equal to the employee's average daily work hours, regardless of the time they would have otherwise been scheduled to work.

5.2 Vacation Leave

5.2.1 The vacation leave earning rate for each employee shall be as follows:

Years of Service Vacation Earned Per Month
0 through 3 years 7.0 hours
4 through 5 years 9.0 hours
6 through 10 years 11.3 hours
11 through 15 years 13.3 hours
16 through 20 years 15.3 hours
Over 20 years 16.6 hours

5.2.2 Employees with less than ten (10) years of service with the City may carry an unused balance of vacation leave of no more than thirty-four (34) days (272 hours) past January 1 of each year. Employees with ten (10) years of service or more may carry an unused balance of vacation leave of no more than forty-four (44) days (352 hours) past January 1 of each year.

Employees with fifteen (15) years of service or more may carry an unused balance of vacation leave of no more than fifty (50) days (400 hours) past January 1 of each year.

5.2.3 No employee may buy out more than ninety-six (96) hours of vacation per calendar year.

Employees may cash out accrued vacation leave once they have three or more years of service. Each calendar year an employee may, at employee’s request, cash out up to ninety- six (96) accrued hours of vacation based on the chart below.

Years of Service Annual Maximum Vacation Leave
Cash out
0 to 3 years 0 hours
3 to 5 years 40 hours
5 to 8 years 80 hours

Page 611 ends

MMPA
July 1, 2024 to June 30, 2026
16 8 + years 96 hours
Vacation leave hours are paid directly to employee at their regular hourly rate of pay at the time of the request in lieu of time off providing the employee is taking at least a cumulative total of 40 hours of vacation leave per calendar year. Payment will be made at the straight time rate.

5.3 Sick Leave

5.3.1 Represented full-time employees shall accrue sick leave at the rate of one (1) day per month.

5.4 Catastrophic Illness or Injury

5.4.1 Represented employees may donate portions of their Vacation or Administrative Leave accumulations to the Catastrophic leave bank to benefit employees who have suffered catastrophic illness or injury. Employees receiving donations of time from the bank must first exhaust all available vacation, administrative time and sick leave.

ARTICLE VI

RETIREMENT

6.1 Retirement

6.1.1 The City will continue its participation in the Public Employee's Retirement System during the term of this agreement.

6.1.2 Permanent Employees of the City of Woodland fall under one of the three CalPERS Pension formulas as follows:
•Tier 1: Employees hired by the City of Woodland on or before December 4, 2012 or who are legacy/classic members as defined by CalPERS are eligible for the 2.7% @ 55 CalPERS retirement pension program calculated at the single highest year pensionable compensation formula.
•Tier 2: Employees hired by the City of Woodland on or after December 5, 2012 and before January 1, 2013 or who are new hires to the city of Woodland but are legacy/classic members determined by CalPERS are eligible for the 2% @ 60 CalPERS retirement pension program calculated at the three-year average pensionable compensation formula.
•Tier 3: Public Employees’ Pension Reform Act (PEPRA) Employees hired on or after January 1, 2013 and who are not CalPERS legacy/classic members are eligible for the 2% @ 62 CalPERS retirement pension program calculated at the three-year average pensionable compensation formula.

6.1.3 PERS Employee Contribution towards Employee’s Share of Retirement cost. •Tier 1 employees shall continue to pay the full 8% of pensionable salary of the employee share towards the 2.7%@55 CalPERS retirement pension program.

Page 612 ends

MMPA
July 1, 2024 to June 30, 2026
17 •Tier 2 employees shall continue to pay the full 7% of pensionable salary of the employee share towards the 2%@60 CalPERS retirement pension program. •Tier 3 (PEPRA) employees shall continue to pay 50% of the normal cost as determined by CalPERS towards the 2%@62 CalPERS retirement pension program.

6.1.4 Employee Cost Sharing towards Employers Cost of CalPERS Retirement Pension Program

6.1.4.1 Pursuant to Public Employees Retirement Law § 20516 employees in Tier 1 & Tier 2 will pay three percent (3%) of pensionable compensation towards the employers share of CalPERS retirement in additional to the contribution towards the employee share of retirement as described in the section above. Employees in Tier 3 (PEPRA) will not contribute an additional percentage of pensionable compensation towards the employer’s share of CalPERS in addition to the 50% of normal cost as determined by CalPERS for Tier 3 (PEPRA) employees. The City adopted a resolution pursuant to IRS Code §4.14(h)(2) to allow this payment on a pre-tax basis.

6.1.5 The City provides the 1959 Survivor's Security Benefit as specified in the Government Code, Section 20862.8. This benefit provides a monthly allowance to certain eligible survivors of an employee who dies prior to retirement.

6.1.6 The City provides the sick leave conversion benefit as specified in the Government Code, Section 20965.

ARTICLE VII

WORKING CONDITIONS

7.1 Work Hours

7.1.1 Work hours for represented employees shall be those agreed to between the employee and his/her Department Director.

7.2 Contracting Out

7.2.1 City shall notify the Association of any formal consideration made by the City Council for the contracting of services presently performed by represented employees. Whenever the City contemplates contracting such services, the City shall endeavor to have the new contractor give first consideration for employment opportunities to represented employees who would be displaced from their job as a result of the contract.

7.2.2 The City retains the right to decide to contract out prior to beginning negotiations.

However, the City shall negotiate the effect of contracting out with the Association prior to taking any further action to contract out.

7.3 Introduction of New Technology

Page 613 ends

MMPA
July 1, 2024 to June 30, 2026
18 7.3.1 The City agrees to confer with representatives of Association on the impacts of the City’s decision to introduce new technology into work performed by classes represented by the Association.

7.4 Association Leave

7.4.1 Each month, elected officers of the Association shall be entitled to take leave with pay from work in order to perform Association business, but such leave shall be limited to an aggregate total of eight (8) hours per calendar month. Each employee taking such leave shall arrange a convenient time approved in advance by his/her immediate supervisor.

Unused time shall not accumulate for use in future months, without prior written approval by the City's Personnel Officer.

7.4.2 Association employees authorized by the Association president shall be entitled to use work time in order to prepare and distribute an Association Newsletter. Such time off shall be taken only with advance approval by the employee's immediate supervisor and the maximum time off allowed in the aggregate, shall be (10) hours per month. Unused time shall not accumulate for use in future months without prior written approval by the City's Personnel Officer.

7.5 Other Working Conditions Not Set Forth Herein

7.5.1 Other working conditions not set forth herein for employees covered by this Resolution shall continue as applicable on December 7, 2011, unless determined otherwise by the Woodland City Council in accordance with law or required otherwise by law.

ARTICLE VIII.

OTHER COMPENSABLE ITEMS NOT SET FORTH HEREIN

8.1 Other Compensable Items not set Forth Herein

8.1.1 Other items not set forth herein which are compensable as terms and conditions of employment of the employees covered by this Resolution shall continue to be compensated by the City of Woodland at the rate applicable on Exhibit A, unless determined otherwise by the Woodland City Council in accordance with law or required otherwise by law.

Page 614 ends

MMPA
July 1, 2024 to June 30, 2026
19 APPENDIX A)
SALARY SCHEDULE EFFECTIVE JULY 1, 2024
Pending

Page 615 ends

Page

MEMORANDUM OF UNDERSTANDING

BETWEEN

THE CITY OF WOODLAND

AND THE

WOODLAND POLICE MID-MANAGEMENT
UNIT
July 1, 2024 to June 30, 2026

Page 616 ends

Page

MEMORANDUM OF UNDERSTANDING

CONCERNING POLICE MID-MANAGEMENT UNIT EMPLOYEES OF THE

CITY OF WOODLAND
The City of Woodland and the Woodland Police Mid-Management employees by and through their authorized representatives, hereby ratify as and for a Memorandum of Understanding the attached Resolution entitled "A Resolution of the City Council of the City of Woodland Approving Certain Terms and Conditions for Police Mid- Management Employees" and the exhibits appended hereto, and recommend that the same be adopted by the City Council of the City of Woodland.

DATED: ___________________
____________________________ ________________
Deputy Chief Dallas Hyde Ken Hiatt
Representative of the
Police Mid-Management Employees City of Woodland

Page 617 ends

Page
The foregoing Resolution and exhibits appended thereto hereby are approved by the City Council of the City of Woodland on this 18th of June 2024.

I
RESOLUTION NO.

A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF WOODLAND

APPROVING CERTAIN TERMS AND CONDITIONS FOR

POLICE MID-MANAGEMENT EMPLOYEES

TABLE OF CONTENTS
ARTICLE I GENERAL PROVISIONS....................................................................5 1 .0 Application..................................................................................................5 1 .1 Term ............................................................................................................5 ARTICLE II COMPENSATION...............................................................................5

2.1 Salary...........................................................................................................5

2.2 Uniform Allowance.....................................................................................5

2.3 Longevity ....................................................................................................6

2.4 Out of Class Work.......................................................................................6

2.5 Professional Growth Incentive....................................................................6

2.6 Bilingual Pay...............................................................................................6

2.7 Certificate Pay.............................................................................................7 ARTICLE III - PERS RETIREMENT ......................................................................7

3.1 PERS Retirement ........................................................................................7

3.2 Tier-1 Police Safety Members. ...................................................................7

3.3 Tier-2 Police Safety Members. ...................................................................8

3.4 Tier-3 Police Safety PEPRA Members .......................................................8 ARTICLE VI .............................................................................................................8

4.1 Medical Insurance .......................................................................................8

4.2 Medical Insurance Upon Retirement .......................................................10

4.3 Life Insurance............................................................................................12

4.4 Dental Insurance........................................................................................12

Page 618 ends

Page

4.5 Long Term Disability Insurance ..............................................................12

4.6 Vision/Optical Insurance..........................................................................13

4.7 Flexible Spending Account ......................................................................13

4.8 Use of Tobacco Products .........................................................................13 ARTICLE V LEAVES ............................................................................................13

5.1 Vacation Leave..........................................................................................13

5.2 Holidays ....................................................................................................14

5.3 Administrative Leave ................................................................................14

5.4 Sick Leave.................................................................................................15

5.5 Catastrophic Illness or Injury ....................................................................15 ARTICLE VI WORKING CONDITIONS..............................................................15

6.1 Work Hours...............................................................................................15

6.2 Probationary Period...................................................................................16

6.3 Re-Opener Clause .....................................................................................16 ARTICLE VII ..........................................................................................................17

7.1 Other Compensable Items Not Set Forth Herein ......................................17 Exhibit A – Salary Schedule....................................................................................19

Page 619 ends

City of Woodland Police Mid-Management
July 1, 2024 to June 30, 2026

Page 5 ends

ARTICLE I GENERAL PROVISIONS
1 .0 Application
This Resolution applies to the employees employed by the City of Woodland in the following classifications:

Deputy Chief
Police Lieutenant
1 .1 Term
The term of this agreement is July 1, 2024 to June 30, 2026

ARTICLE II COMPENSATION

2.1 Salary

2.1 .1 During the term of this agreement, represented employees shall receive the following adjustments to salary:
•Effective July 1, 2024 2.00%
•Effective July 1, 2025 1.00%
•Effective January 1, 2026 2.00%

2.2 Uniform Allowance

2.2.1 Bi-Annual Payments. Employees covered by this Resolution required by the Police Chief to wear a uniform shall receive Nine Hundred ($900) Dollars annually. Payments will be made on a bimonthly basis.

2.2.2 Body Armor. The City will replace soft body armor within six (6) months of the expiration of the manufacturer's warranty.

2.3 Longevity Pay

2.3.1 Longevity Pay shall be earned as follows:
a. Employees with twelve (12) years completed service will receive an additional two- and one-half percent (2.5%) of base pay as a retention incentive; and

Page 620 ends

City of Woodland Police Mid-Management
July 1, 2024 to June 30, 2026

Page 6 ends

b. Employees with seventeen (17) years completed service will receive an additional five (5%) percent of base pay as a retention incentive; and
c.Increases are not cumulative.

2.4 Out of Class Work

2.4.1 Assignment to perform work of a higher-level classification:

Employees assigned by their supervisors to perform the essential duties of a higher-level classification shall receive an additional five percent (5%) of base pay as out of class compensation. Payment shall continue for the term of the assignment to the higher-level classification duties. Assignments shall be limited to six (6) months, which may be extended on approval of the City Manager.

2.4.2 Assignment as Acting Department Head: In the case of assignment as an acting department head, the compensation shall be an additional ten percent (10%) of the base pay. Payment shall continue for the term of the assignment to the higher-level classification duties. Acting assignments shall be limited to six (6) months, which may be extended on approval of the City Manager.

2.4.3 Assignment of duties beyond the scope of employee's classification:

Employees assigned to perform significant and additional duties outside the scope of their job description shall receive an additional five percent (5%) of base pay as special assignment pay.

2.5 Professional Growth Incentive

2.5.1 Employees covered by this Resolution are eligible to participate in the Professional Growth Incentive Program. Employees may receive a reimbursement for professional memberships, subscriptions, professional training (including travel, lodging and parking fees), and attainment of academic degrees.

All such requests require advance approval by the City. Maximum reimbursement per fiscal year per employee shall be $800.00.

2.6 Bilingual Pay

2.6.1 Employees covered by this resolution shall be eligible for the City's Bilingual Policy. Employees meeting the policy's designation criteria shall receive additional compensation above their regular salary at a rate of $200 per month, paid biweekly, per the City’s bilingual policy (City Policy 16-302).

2.7 Certificate Pay

Page 621 ends

City of Woodland Police Mid-Management
July 1, 2024 to June 30, 2026

Page 7 ends

2.7.1 Employees shall receive an additional five ( 5%) percent of base pay for holding a POST Supervisory Certificate.

2.7.2 Employees shall receive an additional four percent ( 4%) percent of base pay for holding a POST Management Certificate.

2.7.3 For up to two (2) years after promotion to Lieutenant, employees shall continue to receive an additional four (4%) percent of base pay for holding a POST Advanced Certificate. Additional pay for holding a POST Advanced Certificate shall terminate upon receipt of the POST Management Certificate or two (2) years, whichever comes first.

2.7.4 Employees shall receive an additional two and a half (2.5%) percent of base pay for holding a Master’s Degree, for having completed POST Command College, or for having completed the Federal Bureau of Investigation (FBI) National Academy. Maximum of 2.5% can be earned under this section.

2.7.5 Total Certificate Pay shall not exceed eleven- and one-half percent (11.5%) of base pay.

ARTICLE III - PERS RETIREMENT

3.1 PERS Retirement

3.1.1 The City will continue its participation in the Public Employee's Retirement System (CALPERS).

3.2 Tier-1 Police Safety Members.

3.2.1 Police Safety Members hired on or before June l, 2012, shall receive the 3% @ 50 formula. highest twelve (12) months for final compensation determination, the Fourth Level of the 1959 Survivor's Benefit, Unused Sick Leave Option and Military Service Credit as Public Service.

3.2.2 These Police Safety Members shall pay the employees share of nine percent (9%) plus four point eight-eight-seven percent (4.887%) of the employer contribution via PERS contract amendment and another three (3%) percent of the employer share for a total of sixteen point eight-eight-seven percent (16.887%), on a pre-tax basis.

Page 622 ends

City of Woodland Police Mid-Management
July 1, 2024 to June 30, 2026

Page 8 ends

3.3 Tier-2 Police Safety Members.

3.3.1 Police Safety Members hired after June 1, 2012, and before January 1, 2013 or Classic members as defined by CalPERS, shall receive the 3% @ 55 formula, highest thirty-six (36) months for final compensation determination, the Fourth Level of the 1959 Survivor's Benefit, Unused Sick Leave Credit option and Military Service Credit as Public Service.

3.3.2 These Police Safety Members shall pay the employees share of nine percent (9%) plus four point eight-eight-seven percent (4.887%) of the employer contribution via PERS contract amendment and another three (3%) percent of the employer share for a total of sixteen point eight-eight-seven percent (16.887%), on a pre-tax basis.

3.4 Tier-3 Police Safety PEPRA Members

3.4.1 New Police Safety Members, as defined by CalPERS, hired on or after January 1, 2013, shall receive the 2.7% @ 57 formula, thirty-six (36) months for final compensation determination the Fourth Level of the 1959 Survivor's Benefit Unused Sick Leave Credit option and Military Service as Public Service.

3.4.2 These Police Safety Members will pay half the total normal cost as determined annually CalPERS on a pre-tax basis.

ARTICLE VI

MEDICAL AND RELATED BENEFITS

4.1 Medical Insurance

4.1.1 The City shall make available to all unit employees, the CalPERS medical insurance program. Employees shall have the option of enrolling in any of the plans provided by CalPERS. The city has the right to explore other options outside of CalPERS for Health Insurance. The Association reserves the right to meet and confer over any options.

4.1.2 For Employees hired before July 1, 2006, the City provides a two-tier medical benefits program:
•Tier One: Employee Only and Employee plus One
•Tier Two: Employee plus Family

Page 623 ends

City of Woodland Police Mid-Management
July 1, 2024 to June 30, 2026

Page 9 ends

Employees hired before July 1, 2006 who provide proof of dual coverage under PERS or another medical insurance program may decline to accept medical coverage. These employees shall be eligible for a payment equal to $405 per month, paid biweekly.

For Employees hired on or after July 1, 2006, the City provides a three-tier medical benefits program:
•Tier One: Employee Only
•Tier Two: Employee plus One
•Tier Three: Employee plus Family
Employees hired after July 1, 2006 who provide proof of dual coverage under PERS or other medical insurance programs may decline to accept medical coverage. These employees shall be eligible for a payment equal to $405 per month, paid biweekly.

The City shall contribute up to the following monthly amounts towards employee medical insurance coverage and cafeteria plan benefit:

Effective Date Employee
Only
Employee plus
One
Family
January 1, 2025 $1,005.96 $2,112.48 $2,615.46
January 1, 2026 $1,036.14 $2,175.85 $2,693.92

Page 624 ends

City of Woodland Police Mid-Management
July 1, 2024 to June 30, 2026

Page 10 ends

4.1.3 Effective January 1, 2022 through December 31, 2022, the City shall contribute the following amounts towards employee medical insurance coverage and cafeteria plan benefit:

Tier
Medical
Benefit
Cafeteria
Plan
Benefit
Total
Benefit
Employee only Note 2 Note 3 Note 4
Employee plus
one
Note 2 Note 3 Note 4
Employee plus
family
Note 2 Note 3 Note 4
Note 1: Per paragraph 4.1.2 above, employees hired before July 1, 2006 who qualify for the “Employee only” tier shall receive medical insurance coverage and cafeteria plan benefit equal to the “Employee plus one” tier.

Note 2: The Medical Benefit will be equal to the minimum established annually by the CalPERS Board (currently $157 from the January 2024 table). It is anticipated that this amount will be adjusted annually based on changes to the medical component of the CPI.

Note 3: Cafeteria Plan benefit will be equal to the difference between the Medical Benefit and the Total Benefit.

Note 4: The Total Benefits amounts are identified in paragraph 4.1.2 above.

4.2 Medical Insurance Upon Retirement

4.2.1 Employees who retire from the City may be eligible for Medical Insurance in accordance with the CalPERS Medical Plan. Dental, Vision and Long-Term Disability Insurance is not provided to retirees.

4.2.2 For employees who were hired before July 1, 2006, with five (5) or more years of continuous City service who either retire and are eligible to receive benefits under the City's PERS plan or retire for disability under PERS shall be eligible for continued health and life insurance coverage subject to the following terms and conditions:

4.2.2.1 Employees 50 years old or older who separate from City service but postpone application to receive PERS retirement benefits must pay the premiums for any continued insurance coverage until the application for benefits is approved;

Page 625 ends

City of Woodland Police Mid-Management
July 1, 2024 to June 30, 2026

Page 11 ends

4.2.2.2 Insurance benefits levels to retirees will be equal to the schedule reflected in paragraph 4.2.1 above. Retirees who were hired before July 1, 2006, will receive a benefit equal to the "Total Benefit" reflected in 4.1 .4 above; however, provisions of paragraphs 4.12.1 and 4.12.2 do not apply to retired employees;

4.2.2.2.1 Retirees who were hired prior to July 1, 2006 have a vested right to receive full medical insurance benefits in retirement equal to the total medical benefit provided to active employees. In the immediate case, such retirees shall receive the combined value of the medical benefit and the cafeteria plan benefit to equal the total benefit. In future cases, should the City again restructure its health care benefits, such retirees shall continue to receive the full value provided to active employees for health benefits irrespective of how they may subsequently be structured.

4.2.2.3 Life Insurance will be continued with the same benefit level and conditions as active employees except as adjusted according to the schedule outlined in the City's "Life Insurance Outline of Benefits" or in any modifications or other plans that replace the current plan;

4.2.2.4 Health Insurance coverage will be coordinated with Medicare when retirees become eligible; and

4.2.2.5 Dental, Vision and Long-Term Disability Benefits will not be offered or provided to retirees.

4.2.3 Employees who were hired on or after July 1, 2006, will receive medical insurance benefits in retirement as follows:

4.2.3.1 Insurance benefits levels to retirees who were hired after July 1, 2006, will receive a benefit equal only to the "Medical Benefit" reflected in 4.1.3 above.

4.2.3.2 Retirement Health Savings Plan. The City of Woodland established a program in which employees participate to save, on a tax-deferred basis, money to help pay the cost of healthcare once an individual retires. The Retirement Health Savings Plan (RHSP) may be used for medical, dental and vision care as well as other healthcare expenses.

4.2.3 3 For employees hired on or after July 1, 2006, participation in the City's RHSP is mandatory.

4.2.3.4 Contributions: The City shall contribute one hundred dollars ($100) per month to the employee's RHSP account the employee shall contribute fifty dollars ($50) per month to their RHSP account. These contributions shall start after an employee has successfully completed their initial probationary period.

However, upon successful completion of probation, the City shall contribute a lump sum of one hundred dollars ($100) per month for each month served in the employee's initial probation.

4.2.3.5 Initial Probationary Period. During an employee's initial probationary period with the City, neither the employee nor the City shall contribute to the employee's RHSP account. The initial probationary period is that probationary period when an employee is first hired. A probationary period is also in effect when an individual changes classification or is promoted to a higher classification;

Page 626 ends

City of Woodland Police Mid-Management
July 1, 2024 to June 30, 2026

Page 12 ends

City and employee contributions to RHSP accounts will continue during such promotional probationary periods.

4.2.3.6 Conversion of Sick Leave. Once an employee has accrued 500 hours of sick leave, the City shall convert 50% of additional sick leave earned to a cash contribution to an employee's RHSP account. This results in all sick leave earned above 500 hours being changed to five (5) hours per month (versus ten hours) with the value of five (5) hours of salary being contributed to the employee's RHSP account.

4.3 Life Insurance

4.3.1 Active Employees: The City shall continue to provide life insurance coverage in the amount of Fifty Thousand Dollars ($50,000).

4.3.2 Retirees shall be eligible for continued life insurance coverage subject to the following terms and conditions:

4.3.2.1 Employees 50 years old or older who "retire" from City Service but postpone application to receive PERS retirement benefits must pay the premiums for any continued life insurance coverage until the application for benefits is approved;

4.3.2.2 The City shall pay the premiums for eligible retired employees who have maintained the applicable life insurance coverage and whose application for PERS retirement benefits has been approved.

4.3.2.3 Life Insurance will be continued with the same benefit level and conditions as active employees except as adjusted according to the schedule outlined in the City's "Life Insurance Outline of Benefits" or in any modifications or other plans that replace the current plan.\

4.4 Dental Insurance

4.4.1 City shall continue to provide employees identified in Section 1.0 of this Resolution and, at the employee's request, any eligible dependents, coverage in the City's dental insurance plan provided to other employees. This benefit shall be paid by the City except where the plan requires the employee to pay a deductible or copayment.

4.5 Long Term Disability Insurance

4.5.1 All represented members will have $68.57 added to their monthly salary payment.

4.5.2 The City provides a monthly disbursement to the Police Mid- Management Association of $68.57 per member deducted from each employee's net pay (or such other amount as determined by the Association).

Page 627 ends

City of Woodland Police Mid-Management
July 1, 2024 to June 30, 2026

Page 13 ends

4.5.3 Police Mid-Management assumes responsibility of making long-term disability payments and any other related benefits from the City provided payment.

4.5.4 The City's sole responsibility in the operation of the long-term disability insurance program shall be to deduct the designated amount. Police Mid-Management shall hold harmless and indemnify the City for any liability as a result of implementation of long-term disability insurance program.

4.6 Vision/Optical Insurance

4.6.1 The City shall provide employees covered by this Resolution with vision insurance.

4.7 Flexible Spending Account

4.7.1 The City agrees to establish a provision allowed by Section 125 of the Internal Revenue Code. Such account shall provide for pre-tax treatment of employee obligations for medical and dependent care costs.

4.8 Use of Tobacco Products

4.8.1 Employees hired after July 1, 2006 shall refrain from the use of all tobacco products during the term of their employment with the City. This section also applies to smokeless tobacco products.

ARTICLE V LEAVES

5.1 Vacation Leave

5.1 .1 The vacation leave earning rate shall be as follows:

Years of Service Vacation Earned Per
Month
0 to 3 years 6.7 hours (10 days/year)
4 to 5 years 8.7 hours (13 days/year)
6 to 10 years 10 hours (15 days/year)
11 to 15 years 12 hours (18 days/year)
16 years and over 14 hours (21 days/year)

Page 628 ends

City of Woodland Police Mid-Management
July 1, 2024 to June 30, 2026

Page 14 ends

5.1.2 Employees with less than ten (10) years of service may carry over a vacation leave balance of no more than three hundred twenty (320) hours past January 1 of each year. Employees with ten (10) years of service or more may carry a vacation leave balance of no more than three hundred eighty-four (384) hours past January 1 of each year.

5.1.3 Employees who have sufficient accrued vacation shall have the option of receiving pay in lieu of time off for eighty (80) hours of the accrued time, provided that the employee is taking at least one (1 ) consecutive week vacation time off. Payment will be made at the straight time rate. No employee may buy- out more than eighty (80) hours of vacation per fiscal year.

5.1.4 The City has amended the Retiree Health Savings Plan to allow the Woodland Police Mid-Management Unit employees to convert up to 40 hours of vacation on November 30 th of each year to a cash contribution into a in an employee’s RHSP Account. Eligible employees are employees who have at least 392 hours of accrued vacation on November 30 and have cashed out the maximum of hours allowed per the MOU.

5.2 Holidays

5.2. Each employee shall receive an additional 8.3 hours per month of vacation leave in lieu of holiday time off. The use and limitations of this additional leave are subject to the same rules and regulations pertaining to vacation leave.

5.3 Administrative Leave

5.3.1 Represented employees in the classifications in Section 1.0 above will receive sixty-four (64) hours of administrative leave. This administrative leave shall be in addition to accrued vacation leave and other leaves provided by the City.

5.3.2 Unused administrative leave may not be carried over past June 30 each year.

5.3.3 Employee may, at his/her request, have up to sixty-four (64) unused hours of the administrative leave bank paid directly to him/her at their hourly rate of pay in effect at the time of the request.

5.3.4 In the Memorandum of Understanding that expired on June 30, 2006, ninety-six (96) hours of administrative leave was provided to each represented employee; however, effective with the start of the MOU that commenced on July 1, 2007, forty (40) of the ninety-six (96) hours were removed from Administrative Leave and the value added to base salary.

5.3.5 Employees terminating prior to January 1 of any fiscal year shall be responsible for repaying a prorated share of Administrative leave.

Page 629 ends

City of Woodland Police Mid-Management
July 1, 2024 to June 30, 2026

Page 15 ends

5.4 Sick Leave

5.4.1 Sick Leave Accumulation
Employees earn and accumulate sick leave at the rate of ten (10) hours per month.

An employee continues to earn sick leave while on any paid leave. There shall be no limit to the amount of sick leave credit an employee may accrue.

5.5Use of Sick Leave

5.5.1 An employee eligible for sick leave is granted such leave for the following reasons:

Non-service-related illness or injury to the employee or physical or mental incapacity of the employee due to non-service-related illness or injury.

Medical, dental office or hospital visits for examination, diagnosis, or treatment.

Up to 48 hours sick leave off with pay may be granted in the event of illness or disability or birth or adoption of a child of the employee's immediate family.

5.6 Catastrophic Illness or Injury

5.6.1 Represented employees may donate portions of their vacation or administrative leave accumulations to other employees who have suffered catastrophic illness or injury. Employees receiving donation of time from other employees must first exhaust all available vacation, compensatory time, administrative leave and sick leave.

ARTICLE VI WORKING CONDITIONS

6.1 Work Hours

6.1.1 Work hours for represented employees shall be those agreed to between the employee and the Police Chief,

6.2 Probationary Period

6.2.1 The probationary period for employees hired or promoted into positions covered by this Resolution shall be one (1) year.

Page 630 ends

City of Woodland Police Mid-Management
July 1, 2024 to June 30, 2026

Page 16 ends

6.3 Re-Opener Clause

6.3.1 Should any other represented Woodland Police Department employee group or association, under successor agreements to those MOU’s or agreements accept fewer economic concessions and/or receive new and better economic provisions than those provided to the WPMMA under this agreement, WPMMA shall have the right to reopen this MOU to discuss possibly receiving the equivalent economic benefit(s) provided to the other Woodland Police Department employee group or association on a prospective basis. The determination of fewer economic concessions or better economic provisions shall be measured on total contract compensation, and not based on any one specific contract provision.

Page 631 ends

City of Woodland Police Mid-Management
July 1, 2024 to June 30, 2026

Page 17 ends

ARTICLE VII

7.1 Other Compensable Items Not Set Forth Herein

7.1.1 Other items not set forth herein which are compensable as terms and conditions of employment of the employees covered by this Resolution shall continue to be compensated by the City of Woodland at the rate applicable unless determined otherwise by the Woodland City Council in accordance with law or required otherwise by law.

Page 632 ends

City of Woodland Police Mid-Management
July 1, 2024 to June 30, 2026
PASSED AND ADOPTED by the City Council this 18th day of June 2024 by the following vote:

AYES:

NOES:

ABSENT:

ABSTAIN:

Tania Garcia Cadena, Mayor
ATTEST:
____________________________________,
Ana B. Gonzalez, City Clerk

Page 633 ends

City of Woodland Police Mid-Management
July 1, 2024 to June 30, 2026
Exhibit A - Salary Schedule
Woodland Police Mid-Management Employees
July 1, 2024
For Future Schedules please see the City of Woodland Published Salary Schedule.

CLASSIFICATION A STEP B STEP C STEP D STEP E STEP F STEP G STEP H STEP Deputy Police
Chief $12,147.51 $12,754.90 $13,392.64 $14,062.29 $14,765.39 $15,503.67 $16,278.85 $17,092.80 Police Lieutenant $11,052.29 $11,604.91 $12,185.15 $12,794.42 $13,434.15 $14,105.86 $14,811.15 $15,551.71

Page 634 ends

TO: THE HONORABLE MAYOR AND CITY COUNCIL
AGENDA: City Council Regular Meeting
DATE: June 18, 2024
ITEM #: H.10
SUBJECT: Introduce and waive the first reading of an Ordinance revising Sections within Chapter 13.24, “Cross-
Connection Control and Backflow Prevention,” to Title
13 of the Woodland Municipal Code

Recommendation for Action: Staff recommends that the City Council introduce and waive the first reading of an ordinance of the City Council of the City of Woodland, California revising sections within Chapter 13.24, “Cross-Connection Control and Backflow Prevention” to Title 13 of the Woodland Municipal Code.

Staff Contact:

Celia Taylor, Water Quality Specialist II, (530) 661-5915, [email protected]

Fiscal Impact:

There is no immediate fiscal impact to the Water Enterprise Fund. Over the next three (3) years, the City will need to hire additional staff dedicated to performing hazard assessments, annual surveys, and inspecting required backflow devices to bring the City of Woodland into compliance.

There is no impact to the general fund.

Background:

The purpose of this agenda item is to present proposed changes and revisions to Chapter 13.24 of the City Ordinance to reflect updated requirements adopted in the State Water Resources Control Board (SWRCB) Cross Connection Control Policy Handbook or “Handbook” adopted December 19th, 2023. The Handbook takes effect July 1, 2024 with a repeal of previous regulations 90 days thereafter. All public water systems are required to comply with the Handbook.

Discussion:

The current Ordinance includes some, but not all, of the provisions required by the Cross Connection Control Policy Handbook or “Handbook" adopted by the State Water Resources Control Board. The Handbook mandates the use of certified backflow prevention assembly testers and cross-connection control specialists to implement the program. A public water system must implement a cross- connection control and backflow prevention program and that program must now include sections for backflow incident response, reporting and notification, public outreach and education, and local public entity coordination, along with updated requirements for backflow device installation, maintenance, and testing. Additionally, the City will outline how and when compliance with new regulations will be achieved.

The state’s Handbook policies will replace previous cross-connection control regulations detailed in Title 17 of the California Code of Regulations of 1987 with minor revisions in 2000. The City’s revised Ordinance will reflect the new requirements of the Handbook; it will protect the Woodland potable water system from potential contamination or pollution and strengthen protection to public health.

Conclusion:

Page 635 ends
← All documents from this meeting