Cities Index.
Agenda packet

Yorba Linda City Council
May 19, 2026

Document
Agenda packet
Meeting
May 19, 2026
Body
Yorba Linda City Council
Pages
1,224
Original file
70.2 MB
Text extracted from the city's file for reading and search. Open the original on pub-yorbalinda.escribemeetings.com. That file is the official record.

882/009410-1018
23556819.5 a04/13/26 -7-
(6) A reasonable utility allowance.
(7) The lease cost incurred for solar panels.

The Monthly Housing Cost of a buyer shall be an average of estimated costs for the next twelve (12) months.

For purposes of this Agreement, the term “adjusted for family size appropriate to the Property” shall mean a household of two (2) persons in the case of a one-bedroom unit and three (3) persons in the case of a two-bedroom unit.

Concurrent with the notice of a proposed Transfer of the Property, Participant shall request from the City a determination of the then current Affordable Sales Price. This determination shall remain in effect for ninety (90) days. For purposes of determining if a proposed sales price constitutes an Affordable Sales Price, the proposed sales price shall mean and refer to the total compensation to be received by Participant in connection with said sale.

PARTICIPANT UNDERSTANDS THAT THE DETERMINATION OF THE

AFFORDABLE SALES PRICE CAN BE MADE ONLY AT THE TIME OF THE

PROPOSED SALE, AND THAT THE AFFORDABLE SALES PRICE PERMITTED

HEREUNDER MAY BE LESS THAN THE FAIR MARKET VALUE OF THE PROPERTY

AND MAY NOT INCREASE OR DECREASE IN THE SAME MANNER AS OTHER

SIMILAR REAL PROPERTY WHICH IS NOT ENCUMBERED BY THE AFFORDABILITY COVENANTS IN THIS AGREEMENT. PARTICIPANT FURTHER ACKNOWLEDGES

THAT IN SETTING THE AFFORDABLE SALES PRICE, THE PRIMARY OBJECTIVE OF

CITY AND THIS AGREEMENT IS TO PROVIDE HOUSING TO ELIGIBLE BUYERS AT AN AFFORDABLE SALES PRICE.

PARTICIPANT’S INITIALS
e. In the event City exercises City’s Option to Purchase, the Affordable Sales Price shall be determined based upon (i) a five percent (5%) down payment; (ii) a thirty-year fully amortizing fixed interest rate mortgage at the then-prevailing home mortgage rate for Orange County, California, as set forth on the FreddieMac website or, if the aforementioned website is no longer available or no longer provides home mortgage rates for Orange County, at the rate available from a reputable institutional lender reasonably selected by City; and (iii) based on the allowable Monthly Housing Cost at the time of City’s purchase. f. In the event Participant sells or otherwise Transfers the Property in violation of the terms of this Agreement or false or misleading statements are made in any documents or certificate submitted to City for its approval of the sale or other Transfer of the Property, City shall have the right to file an action at law or in equity against Participant and/or the proposed buyer to seek to enforce the terms of this Agreement and/or force a sale of the Property to an Eligible Buyer.

Page 748 of 1224 ends

882/009410-1018
23556819.5 a04/13/26 -8-

5. City Provision of Tax Records. Participant acknowledges that in the event City is audited, City may be required to submit the financial information, including tax records, of Participant that were utilized by City to determine Participant’s eligibility to purchase the Property. City shall have no liability to Participant for any damage or injury suffered by Participant as a result of such submittal by City and Participant hereby waives and releases any such rights or claims it may otherwise have at law or at equity.

Participant acknowledges that it is aware of the meaning and legal effect of California Civil Code section 1542, which provides:

A general release does not extend to claims that the creditor or releasing party does not know or suspect to exist in his or her favor at the time of executing the release and that, if known by him or her, would have materially affected his or her settlement with the debtor or released party
____________________________
Participant’s initials

6. Maintenance of Property. Participant shall maintain the improvements and landscaping on the Property (other than those improvements or landscaping maintained by the homeowner’s association for the Property) in a manner consistent with community standards which will uphold the value of the Property, in accordance with the Yorba Lunda Municipal Code. Participant also agrees to comply with any applicable declaration of covenants, conditions, and restrictions recorded against the Project, or portions thereof, and all applicable federal, state and local laws and regulations.

7. Occupancy Standards and Requirements.
a. The Property shall be used as the principal residence of Participant and for no other purpose.
b. Participant shall not enter into an agreement for the rental or lease of the Property, or any portion thereof, or permit the rental of lease of the Property, or any portion thereof.
c. The maximum occupancy of the Property shall be two (2) persons per bedroom, plus one (1) person (i.e., for a two bedroom property, the maximum occupancy is 5 persons).
d. Participant shall, upon demand by City, submit to City an affidavit of occupancy verifying Participant’s compliance with this Section 7. Said affidavit may be required by City on an annual basis.
e. City may grant a temporary waiver of the above requirements for good cause, in City’s sole and absolute discretion.

Page 749 of 1224 ends

882/009410-1018
23556819.5 a04/13/26 -9-

8. City Administrator. City may contract with a consultant or other person or entity (the “Administrator”) to carry out City’s obligations under this Agreement. Any reference to the duties of City herein shall also apply to the Administrator.

9. Income and Asset Information. Participant has submitted an application and additional information verifying income and asset eligibility to City prior to execution of this Agreement. Participant represents, warrants and declares under penalty of perjury to City that all information Participant has provided and will provide in the future to City is and will be true, correct and complete. Participant acknowledges that City is relying upon Participant’s representations that Participant is an Eligible Buyer, and City would not have entered into this Agreement if Participant did not so qualify. Asset eligibility shall be determined pursuant to the definition of Gross Income as set forth in 25 CCR Section 6914, as it may be amended from time to time.

10. Participant Financing. Participant shall obtain financing for the purchase of the Property (a “Primary Mortgage”) from an institutional third party lender reasonably approved by City (the “Lender”). Participant hereby acknowledges that Participant must make a down payment of not less than five percent (5%) and not more than twenty percent (20%) of the purchase price for the Property in connection with the Lender’s financing. A minimum of five percent (5%) of Participant's down payment shall be provided from Participant's own funds (i.e., not gifted or loaned funds). Nothing in this Agreement shall be construed as a promise or guaranty by City that Participant will qualify for or receive a Primary Mortgage from a Lender.

11. Order of Recordation; Request for Notice. Participant agrees it shall instruct the escrow agent for acquisition of the Property by Participant that the order of recording in the escrow for the purchase of the Property by Participant shall occur as follows: 1) the Grant Deed transferring the Property to Participant; 2) this Agreement; 3) the deed of trust securing the Primary Mortgage (the “Primary Mortgage Deed of Trust”); 4) a deed of trust in favor of City, securing Participant’s obligations under this Agreement (the “City Deed of Trust”); and 5) a subordination agreement pursuant to which (a) the Primary Mortgage Deed of Trust shall be subordinated to this Agreement, and (b) the City Deed of Trust shall be subordinated to the Primary Mortgage Deed of Trust.

Participant shall cause a Request for Notice to be recorded on the Property subsequent to the recordation of the Primary Mortgage Deed of Trust requesting a statutory notice of default as set forth in the California Civil Code Section 2924(b). Such notice shall be sent to: City of Yorba Linda, 4845 Casa Loma, Yorba Linda, CA 92886, Attention: City Manager.

12. Approved Refinancing Mortgage. Notwithstanding anything to the contrary in Section 2 above, Participant shall be permitted to refinance the Primary Mortgage Deed of Trust, provided the replacement mortgage constitutes an “Approved Refinancing Mortgage,” which for purposes of this Agreement shall mean a thirty (30) year fully amortizing fixed interest rate mortgage that replaces Participant’s existing thirty (30) year fixed primary mortgage, and conforms to one of the following: (i) the principal

Page 750 of 1224 ends

882/009410-1018
23556819.5 a04/13/26 -10-
balance of the mortgage does not exceed the sum of the then-current outstanding principal balance owed on Participant’s existing thirty (30) year fixed primary mortgage and reasonable closing costs, (ii) the principal balance of the mortgage exceeds the sum of the outstanding balance owed on Participant’s existing thirty (30) year fixed primary mortgage and reasonable closing costs by not more than Twenty-Five Thousand Dollars ($25,000), and has been approved by the Community Development Director of City, in his or her reasonable discretion, or (iii) the principal balance of the mortgage exceeds the sum of the outstanding balance owed on Participant’s existing thirty (30) year fixed primary mortgage and reasonable closing costs by more than Twenty-Five Thousand Dollars ($25,000), and has been approved by the City Council of City, in its sole and absolute discretion.

13. Foreclosure Sale not a Violation of this Agreement. Notwithstanding the requirements hereunder that the Property must be continuously occupied by an Eligible Buyer as the Eligible Buyer’s principal residence, a foreclosure, trustee’s sale, deed in lieu of foreclosure, or other proceeding or transaction under the Primary Mortgage Deed of Trust shall not constitute a default hereunder provided the purchaser of the Property at such sale either (i) qualifies as an Eligible Buyer, executes a complete set of City Subsequent Buyer Documents, and thereafter occupies the Property as the household’s principal residence; or (ii) sells the Property to an Eligible Buyer at the Affordable Sales Price within one hundred eighty (180) days after the conclusion of said sale and said Eligible Buyer executes a complete set of City Subsequent Buyer Documents, and thereafter occupies the Property as the Eligible Buyer’s principal residence.

14. Indemnification. Participant shall defend, indemnify and hold harmless City and City’s officers, officials, agents, members, employees, representatives, and volunteers from and against any loss, liability, claim, or judgment relating in any manner to the Property or this Agreement. Participant shall remain fully obligated for the payment of taxes, liens and assessments related to the Property.

15. Defaults. Failure or delay by either party to perform any term or provision of this Agreement which is not cured within thirty (30) days after receipt of notice from the other party constitutes a default under this Agreement; provided, however, if such default is of the nature requiring more than thirty (30) days to cure, the defaulting party shall avoid default hereunder by commencing to cure within such thirty (30) day period, and thereafter diligently pursuing such cure to completion.

The injured party shall give written notice of default to the party in default, specifying the default complained of by the injured party. Except as required to protect against further damages, the injured party may not institute proceedings against the party in default until thirty (30) days after giving such notice (or such larger period as described in the immediately preceding sentence). Failure or delay in giving such notice shall not constitute a waiver of any default, nor shall it change the time of default.

In addition to any other legal or equitable remedy available to City, in the event of a material default by Participant that has not been timely cured, City shall be entitled to

Page 751 of 1224 ends

882/009410-1018
23556819.5 a04/13/26 -11-
exercise City’s Option to Purchase, provided that City’s sixty (60) day period to exercise City’s Option to Purchase shall commence upon the expiration of the cure period provided to Participant pursuant to this Section 15.

16. Liquidated Damages for Prohibited Transfer. In the event City seeks monetary damages for a Prohibited Transfer, Participant shall be required, to the extent permitted by law, to pay to City the entire amount of the “Sale Price” (as defined below) received in excess of the Affordable Sales Price permitted pursuant to this Agreement; provided, however, that nothing herein shall be deemed to limit City’s remedy for a Prohibited Transfer to seeking monetary damages, and City shall be entitled to pursue any other equitable remedy permitted by law, including specific performance or injunctive relief, to prevent a Prohibited Transfer. For purposes of this Section 16, the “Sale Price” is the price to be paid by the buyer of the Property to Participant for Participant’s interest in the Property, less repayment of the “Primary Note” (as that term is defined in Section 17 below), and after deduction of escrow fees, recording fees, transfer taxes, title insurance costs, broker’s commissions, loan fees or any other closing or transaction costs paid by Participant (other than Participant’s share of property taxes that are paid at the close of escrow).

THE PARTIES HERETO AGREE THAT THE AMOUNT SET FORTH IN THIS SECTION 16 (THE “DAMAGE AMOUNT”) CONSTITUTES A REASONABLE

APPROXIMATION OF THE ACTUAL DAMAGES THAT CITY WOULD SUFFER DUE TO THE DEFAULTS BY PARTICIPANT SET FORTH IN THIS SECTION 16, CONSIDERING

ALL OF THE CIRCUMSTANCES EXISTING ON THE EFFECTIVE DATE OF THIS

AGREEMENT, INCLUDING THE RELATIONSHIP OF THE DAMAGE AMOUNTS TO THE RANGE OF HARM TO CITY AND ACCOMPLISHMENT OF CITY’S PURPOSE OF

ASSISTING IN THE PROVISION OF AFFORDABLE HOUSING TO ELIGIBLE BUYERS

THAT REASONABLY COULD BE ANTICIPATED AND THE ANTICIPATION THAT PROOF OF ACTUAL DAMAGES WOULD BE COSTLY OR INCONVENIENT. THE DAMAGE AMOUNT SET FORTH IN THIS SECTION 16 SHALL BE THE SOLE DAMAGES REMEDY FOR THE DEFAULTS SET FORTH IN THIS SECTION 16, BUT NOTHING IN THIS SECTION 16 SHALL BE INTERPRETED TO LIMIT CITY’S REMEDY FOR SUCH DEFAULT TO DAMAGES. IN PLACING ITS INITIALS AT THE PLACES

PROVIDED HEREINBELOW, EACH PARTY SPECIFICALLY CONFIRMS THE

ACCURACY OF THE STATEMENTS MADE ABOVE AND THE FACT THAT EACH

PARTY HAS BEEN REPRESENTED BY COUNSEL OR HAS HAD THE OPPORTUNITY

TO BE REPRESENTED BY COUNSEL TO EXPLAIN THE CONSEQUENCES OF THE

LIQUIDATED DAMAGES PROVISION AT OR PRIOR TO THE TIME EACH EXECUTED THIS AGREEMENT.

PARTICIPANT’S INITIALS: ___________ CITY’S INITIALS: ___________ Notwithstanding any of the above, nothing herein is intended to preclude City’s recovery of its reasonable attorney’s fees and costs incurred to enforce this Section 16, as provided in Section 30 below.

Page 752 of 1224 ends

882/009410-1018
23556819.5 a04/13/26 -12-

17. Distribution of Insurance and Condemnation Proceeds. In the event the improvements on the Property are destroyed and insurance proceeds are distributed to Participant instead of being used to rebuild such improvements, or in the event of condemnation of the Property, if proceeds thereof are distributed to Participant, such proceeds (the “Proceeds”) shall be paid and distributed as follows: (i) first, to the Lender or the holder of the note secured by the Primary Mortgage Deed of Trust (the “Primary Note”), to pay the remaining balance owed thereon (the “Primary Note Balance”), (ii) second, to the extent Proceeds remain, the difference between the Affordable Sales Price, calculated pursuant to Section 4(d) above, and the Primary Note Balance, shall be distributed to Participant, and (iii) third, to the extent Proceeds remain, all such remaining Proceeds shall be distributed to City.

18. Covenant to Keep Property Drug Free. Participant represents and covenants to City that (i) Participant shall maintain a drug free environment on the Property, and (ii) Participant and all persons residing on the Property shall not unlawfully manufacture, distribute, dispense, possess or use controlled substances, as said term is defined in 21 United States Code Section 812 and California Health and Safety Code Section 11007, including, without limitation, heroin, cocaine, and amphetamines on the Property. If Participant or any person residing on the Property is convicted, or pleads guilty or nolo contendere to a charge of unlawfully manufacturing, distributing, dispensing, possessing or using controlled substances on the Property, then such event shall be deemed a default under this Agreement, which shall entitle City to exercise City’s Option to Purchase within sixty (60) days of City’s notice of said default.

19. Rights and Remedies are Cumulative. Except as otherwise expressly stated in this Agreement, the rights and remedies of the parties are cumulative, and the exercise by either party of one or more of its rights or remedies shall not preclude the exercise by it, at the same or different times, of any other rights or remedies for the same default or any other default by the other party.

20. Covenants to Run with the Land. All conditions, covenants, and restrictions contained in this Agreement shall be covenants running with the land, and shall, in any event, and without regard to technical classification or designation, legal or otherwise, be, to the fullest extent permitted by law and equity, binding for the benefit and in favor of, and enforceable by, City and City’s successors and assigns, against Participant, its successors and assigns, to or of the Property or any portion thereof or any interest therein, and any party in possession or occupancy of said Property or portion thereof.

In amplification and not in restriction of the provisions set forth hereinabove, it is intended and agreed that City shall be deemed a beneficiary of the agreements and covenants provided hereinabove both for and in its own right and also for the purposes of protecting the interests of the community. All covenants without regard to technical classification or designation shall be binding for the benefit of City and such covenants shall run in favor of City for the entire period during which such covenants shall be in force and effect, without regard to whether City is or remains an owner of any land or interest therein to which such covenants relate. City shall have the right, in the event of any

Page 753 of 1224 ends

882/009410-1018
23556819.5 a04/13/26 -13-
breach of any such agreement or covenant, to exercise all the rights and remedies, and to maintain any action at law or suit in equity or other proper proceedings to enforce the curing of such breach of agreement or covenant.

21. Non-Waiver. Failure to exercise any right City may have or be entitled to, in the event of default hereunder, shall not constitute a waiver of such right or any other right in the event of a subsequent default.

22. Recordation; Other Documents. Participant agrees and acknowledges that this Agreement shall be recorded against the Property with the County Recorder of the County of Orange and shall appear of record with respect to and as an encumbrance to the Property. Participant agrees to execute any other documents reasonably required by City to complete the transaction contemplated hereby.

23. Further Assurances. Participant shall execute any further documents consistent with the terms of this Agreement, including documents in recordable form, as City shall from time to time find necessary or appropriate to effectuate its purposes in entering into this Agreement.

24. Governing Law. Participant hereby agrees to comply with all ordinances, rules and regulations of City. Nothing in this Agreement is intended to be, nor shall it be deemed to be, a waiver of any City ordinance, rule or regulation. This Agreement shall be governed by the laws of the State of California. Any legal action brought under this Agreement must be instituted in the Superior Court of the County of Orange, State of California, or in the Federal District Court in the District of California in which Orange County is located.

25. Amendment to Agreement. No modification, rescission, waiver, release or amendment of any provision of this Agreement shall be made except by a written agreement executed by Participant and City.

26. City May Assign. City may, at its option and without obtaining the consent of the Participant, assign this Agreement.

27. Participant Assignment Prohibited. In no event shall Participant assign or transfer any portion of this Agreement or any of the other agreements referred to herein without the prior express written consent of City. Any such assignment or transfer without the prior express written consent of City shall be null and void.

28. Relationship of Participant and City. The relationship of Participant and City pursuant to this Agreement is that of debtor and creditor and shall not be or be construed to be a joint venture, equity venture, partnership, or other relationship.

29. Notices. Any notices, requests or approvals given under this Agreement from one party to another may be personally delivered, delivered by reputable same-day or overnight courier that provides a receipt with the date and time of delivery, or deposited with the United States Postal Service for mailing, postage prepaid, registered or certified mail, return receipt requested to the following address:

Page 754 of 1224 ends

882/009410-1018
23556819.5 a04/13/26 -14-
To Participant:
____________________
____________________
____________________
To City: City of Yorba Linda
4845 Casa Loma
Yorba Linda, CA 92886
Attention: City Manager
Either party may change its address for notice by giving written notice thereof to the other party.

30. Attorneys’ Fees and Costs. In the event that any action is instituted to enforce payment or performance under this Agreement, the parties agree the nonprevailing party shall be responsible for and shall pay all costs, including expert witness fees, and all reasonable attorneys’ fees incurred by such prevailing party in enforcing this Agreement.

31. Recording and Priority of Agreement. Upon complete execution and notarizing of this Agreement, City shall cause this Agreement to be recorded against the Property in the Orange County Recorder’s Office. This Agreement shall be recorded prior to the recording of any deed of trust, including, without limitation, the Primary Mortgage Deed of Trust, and shall have priority over and shall not be made subordinate to any mortgage, deed of trust, or other encumbrance recorded against the Property, including, without limitation, the Primary Mortgage Deed of Trust and lien of any Approved Refinancing Mortgage.

32. Nondiscrimination. Participant covenants by and for itself and any successors in interest that there shall be no discrimination against or segregation of any person, or group of persons on any basis listed in subdivision (a) or (d) of Section 12955 of the California Government Code, as those bases are defined in Sections 12926, 12926.1, subdivision (m) and paragraph (1) of subdivision (p) of Section 12955, and Section 12955.2 of the California Government Code, in the sale, lease, sublease, transfer, use, occupancy, tenure or enjoyment of the Property, or any part thereof, nor shall Participant, or any person claiming under or through him or her, establish or permit any such practice or practices of discrimination or segregation with reference to the selection, location, number, use or occupancy of tenants, lessees, subtenants, sublessees or vendees of the Property, or any part thereof. The foregoing covenants shall run with the land.

The covenants established in this Agreement shall, without regard to technical classification and designation, be binding for the benefit and in favor of City and City’s successors and assigns. The covenants against discrimination shall remain in effect in perpetuity.

Page 755 of 1224 ends

882/009410-1018
23556819.5 a04/13/26 -15-
Notwithstanding the foregoing, the Participant acknowledges and agrees that during Participant’s ownership of the Property, Participant shall occupy the Property as Participant’s principal residence and shall not rent or lease the Property.

33. Entire Agreement. This Agreement, together with all attachments hereto, constitutes the entire understanding and agreement of the parties. This Agreement integrates all of the terms and conditions mentioned herein or incidental thereto, and supersedes all prior negotiations, discussions and previous agreements between Cityand Participant concerning all or any part of the subject matter of this Agreement.

34. Authority. Each signatory hereto warrants to the other party that it has authority to sign on behalf of the party for whom it purports to sign.

35. Non-Liability of Officers and Employees. No officer, official, member, employee, agent, or representative of City shall be personally liable to Participant, or any successor or assign of same, in the event of any default or breach by City, or for any amount which may become due to Participant, or any successor or assign of same, or for breach of any obligation of the terms of this Agreement.

36. Time of Essence. Time is of the essence of every portion of this Agreement in which time is a material part.

37. Interpretation; Severability. The terms of this Agreement shall be construed in accordance with the meaning of the language used and shall not be construed for or against either party hereto by reason of the authorship of this Agreement or any other rule of construction which might otherwise apply. The Section headings are for purposes of convenience only, and shall not be construed to limit or extend the meaning of this Agreement. Each provision of this Agreement shall be severable from the whole. If any provision of this Agreement shall be found contrary to law, the remainder of this Agreement shall continue in full force.

38. Integration; Amendment. It is understood that there are no oral agreements between the parties hereto affecting this Agreement, and this Agreement supersedes and cancels any and all previous negotiations, arrangements, agreements, and understandings, if any, between the parties with respect to the subject matter hereof, and none shall be used to interpret this Agreement. This Agreement may be amended at any time by the mutual consent of the parties by an instrument in writing.

39. Counterparts. This Agreement may be executed in counterparts, each of which, when this Agreement has been signed by each of the parties hereto, shall be deemed to be an original.
[Signatures on next page]

Page 756 of 1224 ends

882/009410-1018
23556819.5 a04/13/26
IN WITNESS WHEREOF, the parties have executed this Agreement as of the day and year written below.

Date: _________________
“Participant”
___________________________
By:

By: _________________________________
Date: __________________
“City”
CITY OF YORBA LINDA, a California
municipal corporation
By:

Peter Grant, City Manager
ATTEST:

Marcia Brown, City Clerk
APPROVED AS TO FORM:

RUTAN & TUCKER, LLP
Todd O. Litfin, City Attorney

Page 757 of 1224 ends

882/009410-1018
23556819.5 a04/13/26
A Notary Public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document.

State of California )
County of ______________________ )
On _________________________, before me, , (insert name and title of the officer) Notary Public, personally appeared ,
who proved to me on the basis of satisfactory evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument.

I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct.

WITNESS my hand and official seal.

Signature (Seal)
A Notary Public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document.

State of California )
County of ______________________ )
On _________________________, before me, , (insert name and title of the officer) Notary Public, personally appeared ,
who proved to me on the basis of satisfactory evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument.

I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct.

WITNESS my hand and official seal.

Signature (Seal)

Page 758 of 1224 ends

882/009410-1018
23556819.5 a04/13/26
A Notary Public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document.

State of California )
County of ______________________ )
On _________________________, before me, , (insert name and title of the officer) Notary Public, personally appeared ,
who proved to me on the basis of satisfactory evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument.

I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct.

WITNESS my hand and official seal.

Signature (Seal)

Page 759 of 1224 ends

882/009410-1018
23556819.5 a04/13/26 Exhibit “A”
EXHIBIT “A”

LEGAL DESCRIPTION OF THE PROPERTY
That certain real property located in the City of Yorba Linda, County of Orange, State of California and described as follows:

Page 760 of 1224 ends

882/009410-1018
23556819.5 a04/13/26
Exhibit “B”
-1-
EXHIBIT “B”

NOTICE OF INTENT TO TRANSFER
[See attached]

Page 761 of 1224 ends

882/009410-1018
23556819.5 a04/13/26
Exhibit “B”
-2-

NOTICE OF INTENT TO TRANSFER

NOTICE OF INTENT TO TRANSFER MUST BE DELIVERED

TO THE CITY OF YORBA LINDA PRIOR TO PLACING THE

PROPERTY ON THE MARKET OR PROCEEDING WITH
ANY TRANSFER OF THE PROPERTY.

From: ______________________________ (“Owner”)
To: City of Yorba Linda
4845 Casa Loma
Yorba Linda, CA 92886
Attention: City Manager
Re:
____________________
____________________
(the “Property”)
Owner desires to [sell, convey, or otherwise transfer] (circle appropriate words) (“Transfer”) the Property.

Owner understands that Owner may not Transfer the Property until the City of Yorba Linda(“City”) has determined that (i) the proposed buyer is an “Eligible Buyer,” and (ii) the proposed sales price is an “Affordable Sales Price”, as those terms are defined in the Affordable Housing Agreement with Resale Restrictions and Option to Purchase Owner entered into with City in connection with Owner’s purchase of the Property (“Agreement”).

To determine if a proposed buyer is an Eligible Buyer and if a sales price is an Affordable Sales Price, Owner must submit to City a complete Seller Checklist in the form attached as Exhibit “F” to the Agreement, and a complete Buyer Eligibility Application in the form attached as Exhibit “G” to the Agreement (“Buyer Application”). Owner is instructed to contact City for assistance in completing the Seller Checklist and Buyer Application.

Date: _________________ ________________________________ Signature of Owner
________________________________
Printed name of Owner
(___) ___________________________
Day time telephone of Owner
(___)____________________________
Cell phone number of Owner
_________________________________
E-mail address of Owner

Page 762 of 1224 ends

882/009410-1018
23556819.5 a04/13/26
Exhibit “B”
-3-
[Signatures continued on next page]
Date: _________________ ________________________________ Signature of Owner
________________________________
Printed name of Owner
(___) ___________________________
Day time telephone of Owner
(___)____________________________
Cell phone number of Owner
_________________________________
E-mail address of Owner

Page 763 of 1224 ends

882/009410-1018
23556819.5 a04/13/26
Exhibit “C”
-1-
EXHIBIT “C”

ASSUMPTION AGREEMENT
[See attached]

Page 764 of 1224 ends

882/009410-1018
23556819.5 a04/13/26
Exhibit “C”
-2-

RECORDING REQUESTED BY
AND WHEN RECORDED MAIL TO:

City of Yorba Linda
4845 Casa Loma
Yorba Linda, CA 92886
Attention: City Clerk
(Space above for Recorder’s use)
(Exempt from Recording Fee Per Gov. Code § 27383)

ASSUMPTION, RELEASE, AND CONSENT AGREEMENT
This ASSUMPTION, RELEASE, AND CONSENT AGREEMENT (“Agreement”), is made as of _________________________, by and between CITY OF YORBA LINDA, a California municipal corporation (“City”), and ___________________________ (“Participant”).

W I T N E S S E T H:

A. Participant has acquired or is about to acquire fee title to that certain real property located in the City of Yorba Linda, County of Orange, State of California described in Exhibit “A” attached hereto and made a part hereof (the “Property”).

B. On or about _____________________, City and
________________________ (the “Original Participant”), the original owner of the Property, entered into that certain Affordable Housing Agreement with Resale Restrictions and Option to Purchase (the “AHA”), which was recorded against the Property on ____________________, as Instrument No. ______________, in the Official Records of the County of Orange (the “Official Records”). Among other terms, the AHA imposes affordability covenants on the Property that require that throughout the term thereof the Property be owned by an income-qualified household that occupies the Property as its principal place of residence.

C. In connection with the Original Participant’s purchase of the Property, the Original Participantexecuted that certain Deed of Trust securing the Original Participant’s repayment of certain sums to City if such sums become due and the Original Participant’s performance under the AHA (the “City Deed of Trust”). The City Deed of Trust was recorded against the Property on _____________________, as Instrument No. _________________, in the Official Records.

D. Participant has met all of City’s requirements to acquire and own the Property. City is willing to consent to the acquisition and ownership, provided Participant assumes all of the Original Participant’sobligations under the AHAand City Deed of Trust (collectively, the “City Documents and Agreements”).

Page 765 of 1224 ends

882/009410-1018
23556819.5 a04/13/26
Exhibit “C”
-3-
NOW THEREFORE, City and Participant agree as follows:

1. Assumption by Participant. As of the Effective Date, Participant(i) assumes and agrees to pay and to perform all of the obligations of the Original Participant under the City Documents and Agreements, and further agrees to be bound by all of the terms, provisions and conditions contained in the City Documents and Agreements as though Participant had originally made, executed and delivered same to City; and (ii) reaffirms and restates all of the representations, warranties, covenants and indemnities of the Original Participantcontained in the City Documents and Agreements with the same force and effect as if each were separately stated herein and made as of the date hereof.

2. Consent and Recognition by City. As of the Effective Date, City (i) consents to the acquisition and ownership of the Property by Participant, and (ii) recognizes that Participant has all of the rights of the Original Participant under the City Documents and Agreements. Such consent by City shall not constitute a consent to any further or subsequent sale, conveyance or transfer by Participant of the Property, or any part thereof, or any interest therein.

3. Release of Original Participant. City hereby releases the Original Participant from any and all liabilities and obligations under the City Documents and Agreements, and agrees that it will not institute any action, suit, claim or demand in law or equity against the Original Participant for or on account of the Original Participant’s personal liability and obligations under the City Documents and Agreements.

4. Conditions Precedent. Before this Agreement becomes effective and any party becomes obligated under it, all of the following conditions shall have been satisfied, at no cost to City, and in a manner acceptable to City in the exercise of City's sole judgment:

A. Execution of this Agreement. Participant shall have executed, with signature(s) notarized, and delivered to City this Agreement.

B. Deed of Conveyance. A grant deed effectuating the transfer of the Property to Participant shall have been duly executed by then-owner of the Property, with signature(s) notarized, and recorded in the Official Records.

The date on which all of the conditions set forth in this Section 4 have been satisfied in the manner described above shall be referred to as the “Effective Date.”

5. Legal Effect. Except as modified by this Agreement, the City Documents and Agreements are unchanged and, as so modified, the City Documents and Agreements shall remain in full force and effect and are hereby ratified and reaffirmed by Participant.

6. Obligations Joint and Several. If Participant is comprised of more than one individual or entity, then the obligations of each such individual or entity under this Agreement and under the City Documents and Agreements shall be joint and several.

Page 766 of 1224 ends

882/009410-1018
23556819.5 a04/13/26
Exhibit “C”
-4-

7. Successors and Assigns. This Agreement shall be binding upon and inure to the benefit of the parties hereto as well as their respective heirs, executors, administrators, successors and assigns.

8. Governing Jurisdiction. This Agreement shall be governed by and construed in accordance with the internal laws of the State of California.

9. Attorneys' Fees. If any lawsuit, arbitration or other proceeding is brought to interpret or enforce the terms of this Agreement, the prevailing party shall be entitled to recover the reasonable fees and costs of its attorneys in such proceeding.

10. Entire Agreement. This Agreement contains the entire agreement between City and Participant with respect to the subject matter hereof and supersedes all prior agreements, understandings, offers and negotiations, oral or written, with respect thereto.

11. Counterparts. This Agreement may be executed in counterparts, each of which, when this Agreement has been signed by each of the parties hereto, shall be deemed to be an original.

IN WITNESS WHEREOF, City and Participant have executed this Agreement as of the date first hereinabove written.

CITY OF YORBA LINDA,
a California municipal corporation
By: _______________________________
Peter Grant, City Manager

PARTICIPANT

Page 767 of 1224 ends

882/009410-1018
23556819.5 a04/13/26
Exhibit “C”
-5-
Notary Public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document.

State of California )
County of Orange )
On _________________________, before me, , (insert name and title of the officer) Notary Public, personally appeared ,
who proved to me on the basis of satisfactory evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument.

I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct.

WITNESS my hand and official seal.

Signature (Seal)

Page 768 of 1224 ends

882/009410-1018
23556819.5 a04/13/26
Exhibit “C”
-6-
Notary Public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document.

State of California )
County of Orange )
On _________________________, before me, , (insert name and title of the officer) Notary Public, personally appeared ,
who proved to me on the basis of satisfactory evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument.

I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct.

WITNESS my hand and official seal.

Signature (Seal)

Page 769 of 1224 ends

882/009410-1018
23556819.5 a04/13/26
Exhibit “C”
-7-
Notary Public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document.

State of California )
County of Orange )
On _________________________, before me, , (insert name and title of the officer) Notary Public, personally appeared ,
who proved to me on the basis of satisfactory evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument.

I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct.

WITNESS my hand and official seal.

Signature (Seal)

Page 770 of 1224 ends

882/009410-1018
23556819.5 a04/13/26
Exhibit “C”
-8-
EXHIBIT “A”

LEGAL DESCRIPTION
That certain real property located in the City of Yorba Linda, County of Orange, State of California described as follows
.

Page 771 of 1224 ends

882/009410-1018
23556819.5 a04/13/26
Exhibit “D”
-1-
EXHIBIT “D”

AFFORDABLE HOUSING DISCLOSURE STATEMENT
[See attached]

Page 772 of 1224 ends

882/009410-1018
23556819.5 a04/13/26
Exhibit “D”
-2-

AFFORDABLE HOUSING DISCLOSURE STATEMENT
Name of
Participant(s):
____________________________________________________
Property Address: ____________________________________________________ Purchase Price: $________________
I/we _________________________ (the “Participant”) am/are purchasing the above described property (the “Property”). I/we understand that to (i) satisfy certain zoning requirements applicable to the Property, and (ii) obtain, under the California Density Bonus Law, waivers of certain City of Yorba Linda (“City”) development standards for the residential development project in which the Property is a part (the “Project”), the developer of the Property was required to restrict the Property as an affordable housing unit. I/we understand that the affordability restrictions imposed on the Property enabled me/us to purchase the Property at the purchase price listed above (the “Purchase Price”), which is less than the market price for the Property.

I/we understand that our ability to purchase the Property is conditioned on a number of factors, including, but not limited to:
• I/we understand that the original buyers of the Property signed an Affordable Housing Agreement with Resale Restrictions and Option to Purchase (“City Affordable Housing Agreement”), and that in connection with my/our purchase, I/we have signed or will sign an Assumption, Release, and Consent Agreement (“Assumption Agreement”), in which I/we have assumed and agreed to be bound by all of the terms and requirements of the City Affordable Housing Agreement.
• I/we have read or had explained to us the terms and conditions of the City Affordable Housing Agreement. I/we understand that the City Affordable Housing Agreement imposes binding legal obligations on me/us. • I/we understand that if I/we attempt to sell the Property to a household that does not qualify under California law as a person or family of moderate income (an “Eligible Buyer”) or if I/we attempt to sell the Property at a price that exceeds a sale price that is affordable to an Eligible Buyer under California law (an “Affordable Sales Price”), the City may pursue all available remedies against me/us, including an action to stop a sale or to force a sale to an Eligible Buyer, or I/we may be required to pay to City a penalty that equals the difference between the sales price for the Property and an Affordable Sales Price (the “Damage Amount”).
• I/we understand that the original buyers of the Property also signed a Deed of Trust that I/we have assumed pursuant to the Assumption Agreement

Page 773 of 1224 ends

882/009410-1018
23556819.5 a04/13/26
Exhibit “D”
-3-
that secures (i) my/our obligation to pay the Damage Amount to the City and the City’s legal fees and costs if any of such amounts become due under the City Affordable Housing Agreement, and (ii) my/our compliance with the City Affordable Housing Agreement.
• I/we understand that the City Affordable Housing Agreement contains an option to purchase that may be exercised by City to purchase the Property at an Affordable Sales Price in the following situations:
 during the period after I/we notify City of my/our desire to sell the Property or I/we place the Property for sale (whichever occurs first), for a minimum of 60 days, and up until the time I/we enter into an agreement to sell the Property to an Eligible Buyer; or
 upon my/our sale of the Property to a buyer who does not qualify as an Eligible Buyer, or any other material default that has not been cured after written notice and an opportunity to cure, including, but not limited to, my/our failure to live in the Property as my/our principal residence.
• I/we understand that the City Affordable Housing Agreement will remain in effect for a period of forty-five (45) years.
• I/we understand that I/we must qualify as “persons and families of moderate income” under California law.
• I/we understand that my/our monthly payments for housing expenses may not be less than 28% of my/our gross household income, nor exceed the product of 35% times 110% of the Orange County area median income adjusted for family size appropriate for the Property, as more specifically defined by Health and Safety Code Section 50052.5.
• I/we understand that during my/our ownership of the Property, I/we must continuously occupy the Property and I/we shall not rent or lease any part of the Property.
• I/we understand that on an annual basis during my/our ownership of the Property, I/we must sign a certification declaring, under penalty of perjury, that I/we have continuously occupied, and continue to occupy, the Property. • I/we understand that on an annual basis during my/our ownership of the Property, we must provide to the City copies of the following documents evidencing our continued occupancy of the Property: (i) two utility bills or other similar documentation, and (ii) a valid California Driver’s License, California Identification Card, or photo ID of similar status.

Page 774 of 1224 ends

882/009410-1018
23556819.5 a04/13/26
Exhibit “D”
-4-
• I/we understand that City shall not be held responsible for any costs associated with the home I/we purchase including, but not limited to, any loan fees or charges, any charges for appraisals or any escrow costs or other costs relating to the transfer of the Property.
• I/we understand that City cannot ensure that information provided by or on my/our behalf will be kept confidential.
• I/we understand that City shall not be responsible for providing information concerning any public or private sources of loans.
• I/we understand that all loans and funding requests must be approved by the City Manager of City. Therefore, a minimum 30 day escrow may be necessary.
“Participant”
By:

Printed Name: ______________________
By: _________________________________
Printed Name: ______________________
Date: _____________________
Date: _____________________
* * *

Page 775 of 1224 ends

882/009410-1018
23556819.5 a04/13/26
Exhibit “D”
-5-
By execution below, the undersigned City representative certifies that he/she met, in person, with the Participant, and read to the Participant (with translator, if English is not a primary language spoken by Participant) this Affordable Housing Disclosure Statement, and further explained to the Participant the purpose and effect of the City Affordable Housing Agreement.

By:

Printed Name:

Title:

Date:

Page 776 of 1224 ends

882/009410-1018
23556819.5 a04/13/26
Exhibit “E”
-1-
EXHIBIT “E”

SUBORDINATION AGREEMENT
[See attached]

Page 777 of 1224 ends

882/009410-1018
23556819.5 a04/13/26
Exhibit “E”
-2-
Free Recording Requested By And
When Recorded Mail To:

City of Yorba Linda
4845 Casa Loma
Yorba Linda, CA 92886
Attention: City Clerk
[Exempt From Recording Fee
Per Gov. Code §6103 and 27383]

SUBORDINATION AGREEMENT
NOTICE: THIS SUBORDINATION AGREEMENT RESULTS IN YOUR SECURITY

INTEREST IN THE PROPERTY BECOMING SUBJECT TO AND OF LOWER PRIORITY THAN THE LIEN OF SOME OTHER OR LATER SECURITY INSTRUMENTS.

THIS SUBORDINATION AGREEMENT (“Agreement”) is entered into as of ____________, 20__, by and among the CITY OF YORBA LINDA, a California municipal corporation (“City”), _____________________ (“Participant”), and _________________ (“Lender”).

R E C I T A L S
A. Participant owns fee title to the real property described on Attachment No. “1” attached hereto and incorporated herein by reference (the “Property”).

B. The Property is part of a forty (40) unit residential townhome project developed by Olson Urban VI – Yorba Linda 2, LLC, a Delaware limited liability company (the “Project Developer”). The Property and the adjacent real property developed as part of the project (collectively, the “Project Site”) is in City’s Residential Urban (R-U) zoning district and is also in City’s Congregational Lands Overlay (CLO) Zone, which, among other requirements, requires that a minimum of twenty percent (20%) of the units developed shall be offered to, and sold to low or moderate income households at an affordable housing cost.

C. Pursuant to the CLO Zone requirements, eight (8) of the residential units constructed by the Project Developer (the “Affordable Units”) are required to be restricted, for forty-five (45) years, for sale to and ownership and occupancy by households which qualify as “persons and families of moderate income” pursuant to Health and Safety Code section 50093 at an affordable sales price, as calculated and determined pursuant to the methodology set forth in Health and Safety Code section 50052.5 (the “Affordable Sales Price”). The Property is one of the Affordable Units.

D. Pursuant to the State of California’s Density Bonus Law (Government Code Section 65915 et seq.) (the “Density Bonus Law”), the residential project qualified for a density bonus (which the Project Developer elected not to request). In connection with

Page 778 of 1224 ends

882/009410-1018
23556819.5 a04/13/26
Exhibit “E”
-3-
the Project Developer’s entitlement application, the Project Developer requested, under the Density Bonus Law, and City granted, waivers of certain City development standards.

E. On or about ____________, the Project Developer sold the Property to ___________________________________ (the “Original Participant”). In connection with the Original Participant’s purchase of the Property, the Original Participant and City entered into that certain Affordable Housing Agreement with Resale Restrictions and Option to Purchase, which, among other things, required that the Original Participant occupy the Property as the Original Participant’s principal place and residence and restricted the Original Participant’s resale of the Property to income-eligible households at a restricted sales price, as approved by City (the “AHA”). The AHA was recorded in the Official Records of the County of Orange (the “Official Records”) as Instrument No. _________________.

F. Concurrently with the execution of the AHA, the Original Participant executed that certain Deed of Trust, which secured the Original Participant’s payment of certain sums to City if such sums become due and the Original Participant’s performance under the AHA (the “City Deed of Trust”). The City Deed of Trust was recorded in the Official Records as Instrument No.____________.

G. On or about the same date hereof, Participant executed that certain Assumption, Release, and Consent Agreement, which is being recorded concurrently herewith in the Official Records, pursuant to which Participant agreed to assume all of the Original Participant’s rights and obligations under the AHA and City Deed of Trust.

H. Participant has executed or is about to execute a deed of trust, in favor of Lender, to be recorded concurrently herewith and encumbering the Property to secure a promissory note in the sum not to exceed
________________________________________________ Dollars ($_____________) (the “Lender Loan”), payable with interest and upon the terms and conditions described in such note (respectively, the “Lender Deed of Trust” and “Lender Note”).

I. Lender is willing to make the Lender Loan provided the Lender Deed of Trust is a lien or charge upon the Property prior and superior to the lien or charge of the City Deed of Trust and provided that City will specifically and unconditionally subordinate the lien or charge of the City Deed of Trust to the lien or charge of the Lender Deed of Trust.

J. City is willing to permit the Lender Loan to be recorded, and to subordinate the lien or charge of the City Deed of Trust to the Lender Deed of Trust provided the AHA is a lien or charge upon the Property prior and superior to the lien or change of the Lender Deed of Trust and provided that Lender will specifically and unconditionally subordinate

Page 779 of 1224 ends

882/009410-1018
23556819.5 a04/13/26
Exhibit “E”
-4-
the lien or charge of the Lender Deed of Trust to the lien or charge of the AHA, all as further set forth in this Agreement.

NOW, THEREFORE, in consideration of the mutual benefits accruing to City, Lender and Participant, and other valuable consideration, the receipt and sufficiency of which are hereby acknowledged, it is hereby declared, understood and agreed as follows:

1. Subordination

1.1 Subordination of City Deed of Trust to Lender Deed of Trust The Lender Deed of Trust (and any renewals or extensions of, or advances, including interest, thereunder) shall unconditionally be and remain at all times a lien or charge on the Property, prior and superior to the lien or charge of the City Deed of Trust, and to all present and future indebtedness and obligations secured thereby, together with all rights and privileges of City thereunder.

1.2 Subordination of Lender Deed of Trust to AHA
The AHA shall unconditionally be and remain at all times a lien or charge on the Property, prior and superior to the lien or charge of the Lender Deed of Trust, and to all present and future indebtedness and obligations secured thereby, together with all rights and privileges of Lender thereunder, but subject to the terms and conditions of this Agreement.

2. Reliance by Lender and City
Lender would not make the Lender Loan, and City would not permit the Lender Loan to be an encumbrance prior to and superior to the City Deed of Trust, without this Agreement and each of the undersigned understands that in reliance upon, and in consideration of, the subordinations effected hereby, specific loans and advances are being and will be made and, as part and parcel thereof, specific monetary and other obligations are being and will be entered into which would not be made or entered into but for such reliance upon these subordinations.

3. Notification
Upon City’s or Lender’s recordation of a Notice of Default in the Official Records of the County of Orange, the party recording the Notice of Default shall, concurrently with such recording, provide the other party with a copy of such Notice of Default.

Page 780 of 1224 ends

882/009410-1018
23556819.5 a04/13/26
Exhibit “E”
-5-

4. Disbursements
Lender, in making disbursements of the proceeds of said Lender Loan, is under no obligation or duty to, nor has Lender represented that it will, see to the application of such proceeds by the person or persons to whom disbursements thereof are made and any application or use of such proceeds for purposes other than those provided in the documents evidencing and securing such Lender Loan shall not defeat the subordination herein made in whole or in part.

5. Miscellaneous

5.1 Entire Agreement
This Agreement shall be the whole and only agreement with regard to the matters set forth herein and shall supersede and cancel, but only insofar as would affect the priority between the Lender Deed of Trust, the AHA, and the City Deed of Trust, any prior agreement as to such subordinations.

5.2 Successors and Assigns
This Agreement shall inure to and bind the heirs, legatees, devisees, administrators, executors, successors and assigns of the parties hereto.

5.3 California Law
This Agreement shall be construed according to the internal laws of the State of California without regard to conflict of law principles.

5.4 Severability
If any term, provision, condition or covenant of this Agreement or the application thereof to any party or circumstances shall, to any extent, be held invalid or unenforceable, the remainder of this instrument, or the application of such term, provision, condition or covenant to persons or circumstances other than those as to whom or which it is held invalid or unenforceable shall not be affected thereby, and each term and provision of this Agreement shall be valid and enforceable to the fullest extent permitted by law.

5.5 Notice
Any notice, demand, request, consent, approval or communication that any party desires or is required to give to another party or any other person must be in writing and may be given by personal delivery, by mailing the same by registered or certified mail,

Page 781 of 1224 ends

882/009410-1018
23556819.5 a04/13/26
Exhibit “E”
-6-
return receipt requested, postage prepaid, or by a reputable same day or overnight delivery service that provides a receipt showing date and time of delivery, to the party to whom the notice is directed at the address of such party hereinafter set forth, or such other address and to such other persons as the parties may hereafter designate. Any such notice shall be deemed given (i) upon receipt if by personal delivery or by delivery service, or (ii) forty-eight (48) hours after deposit in the United States mail, if sent by mail pursuant to the foregoing.

If to City: City of Yorba Linda
4845 Casa Loma
Yorba Linda, CA 92886
Attention: City Manager
With copy to: Rutan & Tucker, LLP
18575 Jamboree Road, 9th Floor
Irvine, CA 92612
Attention: Todd Litfin, Esq.

If to Participant: _________________
_________________
_________________
Yorba Linda, CA ____
If to Lender: __________________
__________________
__________________
Attention:___________

5.6 Attorneys’ Fees
In the event that any action, suit or other proceeding is brought to enforce the obligations under this Agreement, the prevailing party shall be entitled to receive all of such party’s costs and expenses of suit, including attorneys’ fees, expert witness fees, and all costs incurred in each and every action, suit or other proceeding, including any and all appeals or petitions therefrom.

5.7 Counterparts
This Agreement may be executed in any number of counterparts, each of which shall be an original, but all of which shall constitute one and the same document. [End – Signature Page Follows]

Page 782 of 1224 ends

882/009410-1018
23556819.5 a04/13/26
Exhibit “E”
-7-
IN WITNESS WHEREOF, the parties have executed this Subordination Agreement as of the date first written above.

NOTICE: THIS SUBORDINATION AGREEMENT RESULTS IN YOUR SECURITY

INTEREST IN THE PROPERTY BECOMING SUBJECT TO AND OF LOWER PRIORITY THAN THE LIEN OF SOME OTHER OR LATER SECURITY INSTRUMENTS. “CITY”
CITY OF YORBA LINDA, a California
municipal corporation
By:

Peter Grant, City Manager
ATTEST:

By:

Marcia Brown, City Clerk

APPROVED AS TO FORM

RUTAN & TUCKER, LLP
By:

Todd O. Litfin, City Attorney
“PARTICIPANT”
_____________________________________
By: ___________________________________
By: ___________________________________
“LENDER”
By:

Page 783 of 1224 ends

882/009410-1018
23556819.5 a04/13/26
Exhibit “E”
-8-
A Notary Public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document.

State of California )
County of Orange )
On _________________________, before me, ,
(insert name and title of the officer)
Notary Public, personally appeared ______________________ who proved to me on the basis of satisfactory evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument.

I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct.

WITNESS my hand and official seal.

Signature (Seal)

Page 784 of 1224 ends

882/009410-1018
23556819.5 a04/13/26
Exhibit “E”
-9-
A Notary Public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document.

State of California )
County of Orange )
On _________________________, before me, ,
(insert name and title of the officer)
Notary Public, personally appeared _______________________________________, who proved to me on the basis of satisfactory evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument.

I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct.

WITNESS my hand and official seal.

Signature (Seal)

Page 785 of 1224 ends

882/009410-1018
23556819.5 a04/13/26
Exhibit “E”
-10-
A Notary Public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document.

State of California )
County of Orange )
On _________________________, before me, ,
(insert name and title of the officer)
Notary Public, personally appeared ,
who proved to me on the basis of satisfactory evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument.

I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct.

WITNESS my hand and official seal.

Signature (Seal)

Page 786 of 1224 ends

882/009410-1018
23556819.5 a04/13/26
EXHIBIT “E”
-11-
ATTACHMENT NO. 1

LEGAL DESCRIPTION OF PROPERTY
That certain real property located in the City of Yorba Linda, County of Orange, State of California described as follows:

Page 787 of 1224 ends

882/009410-1018
23556819.5 a04/13/26
Exhibit “F”
-1-
EXHIBIT “F”

SELLER CHECKLIST
[See attached]

Page 788 of 1224 ends

882/009410-1018
23556819.5 a04/13/26
Exhibit “F”
-2-
[INSERT PROPERTY ADDRESS]

SELLER CHECKLIST

SUMMARY
Application Date:

Proposed Buyer:

Vesting:

Property Address:

Household Size: Gross Household Income:

Affordable Sales Price:

Pre-Approval / Denial Date:

Primary Mortgage Amount: Down Payment Amount:

Interest Rate: Cost to Close:

Final Approval / Denial Date: Close of Escrow:

Page 789 of 1224 ends

882/009410-1018
23556819.5 a04/13/26
Exhibit “F”
-3-
PHASE I DOCUMENTS:

REQUIRED TO BE SUBMITTED BY THE PARTICIPANT AND/OR THE PRIMARY MORTGAGE

LENDER TO THE CITY ADMINISTRATOR FOR PRE-APPROVAL OF A PROSPECTIVE BUYER HOUSEHOLD COMPOSITION DOCUMENTS:

1. For all Adult Household members, a photocopy of a driver’s license or other photo identification must be provided.

2. For minors, a copy of the birth certificate is the preferred form of identification. If a birth certificate is not available, the City may accept the following: adoption papers, custody agreement, court-ordered assignment, or verification for a social services agency.

3. Adult Household members who are dependents of the proposed buyer, and who are full-time students will be required to provide copies of school transcripts or registration verification showing current full-time student status.

4. Divorced or legally separated Household members must provide a copy of the divorce decree or legal separation document signed by a court officer. Married, but separated, couples must demonstrate at least one full year of complete financial and residential separation at time of application to be considered separated for purposes of determining eligibility. If this cannot be demonstrated, the couple must submit the application as co-applicants.

FINANCIAL DATA:

1. Credit reports shall be submitted for each Adult Household member. Credit reports will be used to confirm information pertaining to the proposed buyer such as current and previous addresses, current and previous employers, marital status, loan history, income to debt ratio, etc.

2. Copies of the three most recent months of statements for all accounts, including checking, savings, or other investment accounts owned in part or full by all Adult Household members shall be submitted:
a. These account statements must demonstrate that the funds proposed to be used for the Actual Down Payment have been available for at least 90 days. b. These statements must identify the current period and year-to-date income earned on each account through interest and/or dividends.

Page 790 of 1224 ends

882/009410-1018
23556819.5 a04/13/26
Exhibit “F”
-4-

3. Signed copies of each Adult Household member’s most recent federal income tax return, including all schedules and attachments, must be submitted. Tax returns shall be used by the City to verify residency history, family composition, income history, and real estate ownership.

4. A copy of a pre-qualification letter and full loan application packet shall be submitted by the Primary Mortgage Lender. The application packet shall include but shall not be limited to the signed fully completed mortgage application, loan underwriting analysis, income verification and credit verification.

5. Evidence shall be submitted that verifies that the proposed buyer’s Back-End Ratio does not exceed 50%.

6. Evidence shall be submitted that verifies that the proposed Actual Down Payment amount comports with the defined minimum and maximum percentages of the Sales Price.

INCOME VERIFICATION:

1. In the order of preference, the following employment income verification sources will be considered acceptable. The documentation must specify the amount and type of pay (i.e. wages, overtime wages, commissions, and bonuses), frequency of pay, and year to date earnings:
a. Check stubs or earning statements showing employee’s gross pay per pay period and frequency of pay. The check stubs should include the year-end statement for the last full year of employment, and the most recent four pay periods; or b. Letter from the employer on company letterhead and signed by an authorized company representative.

2. Net income from a business owned in part or full by any Adult Household member will be considered when determining income eligibility. Net income is defined as gross revenues received minus cash expenses that are essential for the operation of the business. Capital expenditures, principal reductions on loan obligations, and depreciation are excluded from the calculation of net income:
a. To estimate current net business income, the City will require the most recent two federal tax returns and two full years of business and personal checking, savings, and other investment account statements for all business owners/partners. proposed buyers with fewer than two full years of verifiable business income history will not be considered for eligibility to purchase an Affordable Unit.

Page 791 of 1224 ends

882/009410-1018
23556819.5 a04/13/26
Exhibit “F”
-5-
b. proposed buyers must itemize gross business revenues for the period covered by the most recent two federal tax returns and forecast gross business revenues for the year beyond the time of application. The proposed buyers must also itemize the cash expenses that were applied to determine net business income for both periods.

3. The net equity in real property owned by any Adult Household member will be considered when determining income eligibility:
a. The City will require proposed buyers to obtain an appraisal of the property’s Fair Market Value.
b. proposed buyers must provide substantiating information that identifies the dollar amount of any outstanding loans secured by the property. c. If the property is proposed to be sold prior to the close of escrow on the Affordable Unit, the funds being applied to the down payment and/or closing costs on the purchase of the Affordable Unit will be deducted from the net equity.
d. In accordance with California Code of Regulations Section 6914, a 10% return on equity will be added to the proposed buyer’s Gross Income.

4. Proposed buyers must submit a copy of their most recent award or benefit notification letter for Social Security, Pensions, Supplementary Security Income (SSI), Welfare and/or Disability Income prepared and signed by the authorizing agency. At the City’s sole discretion, checks or bank deposit slips that show only net amounts remaining after deductions for SSI or Medicare may be accepted when award letters cannot be obtained.

5. Verification of alimony or child support income will be considered acceptable in the order listed:
a. Copy of a separation of settlement agreement or a divorce decree stating amount and type of support and payment schedules.
b. A notarized letter from the person paying the support attesting to the amount and terms of support payments.

ADDITIONAL REQUIRED DOCUMENTS

1. Form 1003 – Loan application for the Primary Mortgage

2. Verification that the Prospective Home Buyer has made an appointment to attend the Home Buyer Education Course.

Page 792 of 1224 ends

882/009410-1018
23556819.5 a04/13/26
Exhibit “F”
-6-

PHASE II DOCUMENTS

REQUIRED TO BE SUBMITTED BY THE PRIMARY MORTGAGE LENDER

TO THE CITY ADMINISTRATOR FOR THE FINAL APPROVAL

OF THE PROPOSED RESALE OF THE AFFORDABLE UNIT

1. Residential Purchase Agreement

2. Affordable Housing Disclosure Statement

3. Conditional Approval of the Primary Mortgage by the Primary Mortgage Lender

4. Loan estimate for the Primary Mortgage

5. Draft Closing Disclosure for the Primary Mortgage

6. Estimated Closing Statement from Escrow

7. Verification of Employment for all Adult Household members

8. Preliminary title report with wiring instructions

9. Escrow instructions with vesting information

10. Appraisal for the Affordable Unit

11. Certificate of completion for the Home Buyer Education Course

Page 793 of 1224 ends

882/009410-1018
23556819.5 a04/13/26
Exhibit “G”
-1-
EXHIBIT “G”

BUYER APPLICATION
[See attached]

Page 794 of 1224 ends

882/009410-1018
23556819.5 a04/13/26
Exhibit “G”
-2-

BUYER ELIGIBILITY APPLICATION
[INSERT PROPERTY ADDRESS]

CITY OF YORBA LINDA
This application must be completed, attached with all applicable required documents, signed by all applicants, and submitted to the City of Fullerton. Co-applicant information must be provided for all household members and/or persons to be designated on the property title.

Applicant Information
Name of Applicant:

Marital Status: Date of Birth:

Social Security #: Driver License #:

Employment Status: Number of Years at Current Address:

Current Address:
 Own  Rent
Primary Telephone #: Email Address:

Co-Applicant Information
Name of Co-Applicant:

Marital Status: Date of Birth:

Social Security #: Driver License #:

Employment Status: Number of Years at Current Address:

Current Address:
 Own  Rent
Primary Telephone #: Email Address:

Page 795 of 1224 ends

882/009410-1018
23556819.5 a04/13/26
Exhibit “G”
-3-
Additional Household Member Who Will be Residing in the Affordable Unit (For more than one additional household member provide the information on a separate sheet) Name of Additional Household Member:

Relationship to the Applicant: Date of Birth:

Social Security #: Driver License #:

Employment Status: Number of Years at Current Address:

Current Address:
 Own  Rent
Primary Telephone #: Email Address:

Persons that will Appear on Title to the Property:

Name Relationship to the Applicant
Threshold Questions
At the time of purchase will any household member or person proposed to appear on title to the property have any interest in real property, including mobilehomes?
 Yes  No
Will the Property be your primary residence? This means that your household must occupy the unit for at least 10 out of 12 months per year.  Yes  No

Page 796 of 1224 ends

882/009410-1018
23556819.5 a04/13/26
Exhibit “G”
-4-
Mortgage Lender Information
Contact Person Name:

Lender’s Address:

Telephone #: Email Address:

Purchase Price Information
Total Purchase Price of the Property:

Mortgage Amount: Down Payment Amount:

Note: All household members and persons who will appear on title to the property must initial next to the Total Purchase Price of the Property, acknowledging that the property is subject to affordable housing agreements with the City of Fullerton. By initialing this price, you indicate your understanding and agreement that no payment will be made separate from this price and/or separate from the Residential Purchase Agreement by you or anyone on your behalf.

Source of Funds for Down Payment and Closing Costs
Source of Funds
Dollar Amount to be Used for Down Payment &
Closing Costs

Page 797 of 1224 ends

882/009410-1018
23556819.5 a04/13/26
Exhibit “G”
-5-
Gross Earned Income 1
List All Sources of Earned Income for:

Household Members and Persons that will Appear on Title to the Property Provide an additional sheet if necessary
Head of
Household
Other
Household
Member(s)
Monthly
Total

1. Gross amount, before payroll deductions of
wages, salaries, overtime pay, commissions,
fees, tips and bonuses
$ $ $

2. Net income from business $ $ $

3. Social security, annuities, insurance policies,
pension/retirement funds, disability or
death benefits received periodically
$ $ $

4. Payment in lieu of earnings, such as
unemployment, disability compensation,
worker’s compensation and severance pay
$ $ $

5. Public assistance, welfare payments $ $ $

6. Alimony, child support, other periodic
allowances
$ $ $

7. Regular pay, special pay and allowances of
members of the Armed Forces
$ $ $

8. Other $ $ $
Subtotal: Monthly Earned Income $
Total Monthly Earned Income x 12 = $_______________ Total Annual Household Gross Earned Income
1 The following items are not considered income: casual or sporadic gifts; amounts specifically for or in reimbursement of medical expenses; lump sum payments such as inheritances, insurance payments, capital gains and settlement for personal or property losses; educational scholarships paid directly to the student or educational institution; special pay to a serviceman head of family away from home and under hostile fire; relocation payments under federal, state or local law; foster child care payments; value of coupon allotments for purpose of food under Food Stamp Act of 1964 which is in excess of amount actually charged the eligible household; payments received pursuant to participation in the following programs: VISTA, Service Learning Programs, and Special Volunteer Programs, SCORE, ACE, Retired Senior Volunteer Program, Foster Grandparent Program, Older American Community Services Program, and National Volunteer Program to Assist Small Business Experience.

Page 798 of 1224 ends

882/009410-1018
23556819.5 a04/13/26
Exhibit “G”
-6-
Assets 2
List All Assets Owned by Household Members and Persons that will Appear on Title to the Property Provide an additional sheet if necessary
Head of
Household
Other
Household
Member(s) Total
Return @ 10%
of Total

1. Bank & savings accounts $ $ $ $

2. Stocks and bonds $ $ $ $

3. Real property $ $ $ $

4. Other $ $ $ $
DOCUMENTS REQUIRED TO BE SUBMITTED WITH THE APPLICATION:

1. A copy of California driver license or identification for all household members and any person who will appear on title to the property.

2. Copy of three most recent months of checking, savings, and other investment account statements for all household members and persons who will appear on title to the property. If self employed, 12 months of personal and business account statements are required. Account statements must demonstrate sufficient funds for the down payment and closing costs.

3. Signed copies of the two most recent years of federal tax returns (with all schedules and attachments), including W2s and 1099s for all household members and persons who will appear on title to the property. If self employed, include four most recent quarterly tax filings.

4. If applicable:
a. Copy of separation agreement, divorce decree evidencing dissolution of marriage, and/or alimony.
b. Copy of three most recent pay stubs.
c. Copy of pension statements.
2 Necessary items, such as furniture and automobiles, used for personal use are excluded from household assets. Collections of items for hobby, investment or business purposes must be included in household assets. Under California Government Code Section 6914, if the total value of household assets exceeds $5,000, the calculation of the household’s annual income shall include the greater of the actual amount of income, if any, derived from all of the household assets; or 10% of the total value of the assets.

Page 799 of 1224 ends

882/009410-1018
23556819.5 a04/13/26
Exhibit “G”
-7-
d. Copy of Social Security verification.
e. Copy of disability income verification.
f. Copy of unemployment benefits verification.
g. Copy of welfare verification.

CERTIFICATION
I/We certify, under penalty of perjury, that the information provided in this Homebuyer Eligibility Application: ________________ is true and correct as of the date set forth opposite my/our signature(s) and acknowledge my/our understanding that any intentional or negligent misrepresentation(s) of the information contained in this application may result in civil liability and/or criminal penalties including, but not limited to, fines or imprisonment, or both, liability for monetary damages to the City of Fullerton, its agents, insurers, and any other person who may suffer any loss due to reliance upon any misrepresentation which I/we have made on this application.

Applicant’s Signature Co-Applicant’s Signature
Applicant’s Name Co-Applicant’s Name
Date Date

Page 800 of 1224 ends

882/009410-1018
23556819.5 a04/13/26
Exhibit “H”
-1-
EXHIBIT “H”

SAMPLE CALCULATION OF AFFORDABLE SALES PRICE
[See attached]

Page 801 of 1224 ends

882
/009410-1018
23556819.5 a04/13/26
Exhibit “H” -2- Page 802 of 1224
882/009410-1018
23556841.5 a04/13/26

FREE RECORDING REQUESTED BY
AND WHEN RECORDED MAIL TO:

City of Yorba Linda
4845 Casa Loma
Yorba Linda, CA 92886
Attention: City Clerk
(Space Above For Recorder’s Use)
[Exempt from Recordation Fee per Gov. Code § 27383]

DEED OF TRUST
THIS DEED OF TRUST (this “Deed of Trust”) is entered into as of ___________________, by _____________________________________, whose address for notice purposes is _______________________________ (“Trustor”), in favor of FIRST AMERICAN TITLE COMPANY (“Trustee”) for the benefit of the CITY OF YORBA LINDA, whose address for notice purposes is 4845 Casa Loma, Yorba Linda, CA 92886 (“Beneficiary” or “City”).

RECITALS
A. Trustor is the owner of fee title to that certain real property located in the City of Yorba Linda, County of Orange, State of California, as more particularly described in Exhibit “A” attached hereto (the “Property”).

B. The Property is part of a forty (40) unit residential townhome project developed by Olson Urban VI – Yorba Linda 2, LLC, a Delaware limited liability company (the “Project Developer”). The Property and the adjacent real property developed as part of the project (collectively, the “Project Site”) is in City’s Residential Urban (R-U) zoning district and is also in City’s Congregational Lands Overlay (CLO) Zone, which, among other requirements, requires that a minimum of twenty percent (20%) of the units developed shall be offered to, and sold to low or moderate income households at an affordable housing cost.

C. Pursuant to the CLO Zone requirements, eight (8) of the residential units constructed by the Project Developer (the “Affordable Units”) are required to be restricted, for forty-five (45) years, for sale to and ownership and occupancy by households which qualify as “persons and families of moderate income” pursuant to Health and Safety Code section 50093 at an affordable sales price, as calculated and determined pursuant to the methodology set forth in Health and Safety Code section 50052.5 (the “Affordable Sales Price”).

D. Pursuant to the State of California’s Density Bonus Law (Government Code Section 65915 et seq.) (the “Density Bonus Law”), the residential project qualified for a density bonus (which the Project Developer elected not to request). In connection with the Project Developer’s entitlement application, the Project Developer requested, under the Density Bonus Law, and City granted, waivers of certain City development standards.

Page 803 of 1224 ends

882/009410-1018
23556841.5 a04/13/26 -2-
E. On _____, 2026, City and the Project Developer entered into that certain Affordable Housing and Density Bonus Agreement and Declaration of Covenants, Conditions, and Restrictions, which was recorded on ________, as Instrument No. _____________, in the Official Records of Orange County (the “Declaration”). The Declaration designated the Property as one of the Affordable Units.

F. To implement the requirements of the Declaration, Trustor and City entered into that certain Affordable Housing Agreement with Resale Restrictions and Option to Purchase (the “Agreement”). Under the terms of the Agreement, Trustor is required, among other things, to occupy the Property as Trustor’s principal place of residence, and may only sell the Property to income-eligible households at a restricted sales price, as approved by City, all as more particularly set forth therein.

G. Trustor is executing this Deed of Trust in favor of Beneficiary to secure certain financial obligations of Trustor under the Agreement and Trustor’s performance of its obligations under the Agreement.

NOW, THEREFORE, in consideration of the foregoing Recitals, which are incorporated herein by this reference, and for other valuable consideration, the sufficiency of which is hereby acknowledged, Trustor, Trustee and Beneficiary agree as follows:

1. Grant In Trust. For the purposes and upon the terms and conditions set forth in this Deed of Trust, Trustor grants, transfers, and assigns to Trustee, in trust, with power of sale and right of entry and possession, the property located in the City of Yorba Linda, County of Orange, State of California described in Exhibit “A” and any interest therein, together with rents, issues, and profits thereof (“Property”).

2. Obligations Secured. Trustor makes this grant and assignment for the purpose of securing the following obligations: (i) the obligation to comply with and perform all of Trustor’s obligations under the Agreement and under this Deed of Trust, (ii) the obligation under Section 16 of the Agreement to pay the “Damage Amount” (as defined in the Agreement) in the event such amount becomes due, or to obtain any other legal or equitable remedy for a default under the Agreement, and (iii) the obligation under Section 21 of the Agreement to pay attorneys’ fees and costs incurred by City if the event such fees and costs become due.

3. Subordination; Priority of Agreement. The lien created by this Deed of Trust shall be subject and subordinate to the lien of Trustor’s primary mortgage (“First Deed of Trust”) and to any refinancing of that loan permitted under the Agreement, and City shall promptly execute, acknowledge and deliver such subordination agreement or other similar documentation as the lender making the loan secured by that First Deed of Trust, or such refinancing thereof, may request to confirm the subordination of this Deed of Trust. Notwithstanding the foregoing, however, the Agreement shall be and remain in a prior position to the First Deed of Trust and any refinancing of that loan permitted under the Agreement.

4. Incorporation of Fictitious Deed of Trust. To protect the security of this Deed of Trust, and with respect to the Property above described, Trustor expressly makes each

Page 804 of 1224 ends

882/009410-1018
23556841.5 a04/13/26 -3-
and all of the agreements, and adopts and agrees to perform and be bound by each and all of the terms and provisions set forth in subdivision A, and it is mutually agreed that each and all of the terms and provisions set forth in subdivision B of the fictitious deed of trust recorded in the offices of the County Recorders of the counties of the State of California on October 25, 1973, in the book and at the page of Official Records in the office of the county recorder of the county where said property is located, noted below opposite the name of such county, namely (and reprinted herein):

COUNTY BOOK PAGE COUNTY BOOK PAGE COUNTY BOOK PAGE COUNTY BOOK PAGE Alameda 435 684 Kings 792 833 Placer 895 301 Sierra 29 335 Alpine 1 250 Lake 362 39 Plumas 151 5 Siskiyou 468 181
Amador 104 348 Lassen 171 471 Riverside 3005 523 Solano 1105 182 Butte 1145 1 Los
Angeles
T2055 899 Sacramento 4331 62 Sonoma 1851 689
Calaveras 145 152 Madera 810 170 San Benito 271 383 Stanislaus 1715 456 Colusa 296 617 Marin 1508 339 San
Bernardino
5567 61 Sutter 572 297
Contra
Costa
3978 47 Mariposa 77 292 San
Francisco
A332 905 Tehama 401 289
Del Norte 78 414 Mendocino 579 530 San
Joaquin
2470 311 Trinity 93 366
El Dorado 568 456 Merced 1547 538 San Luis
Obispo
1151 12 Tulare 2294 275
Fresno 4626 572 Modoc 184 851 San Mateo 4078 420 Tuolumne 135 47 Glenn 422 184 Mono 52 429 Santa
Barbara
1878 860 Ventura 2062 386
Humboldt 657 527 Monterey 2194 538 Santa Clara 5336 341 Yolo 653 245 Imperial 1091 501 Napa 639 86 Santa Cruz 1431 494 Yuba 334 486 Inyo 147 598 Nevada 305 320 Shasta 684 528
Kern 3427 60 Orange 5889 611 San Diego Series 2 Book 1961, Page 183887 shall inure to and bind the parties hereto, with respect to the Property.

Notwithstanding the incorporation herein of subdivision A and subdivision B of the fictitious deed of trust referenced above, Trustor shall not be required to procure and maintain property insurance for the Property, because the Property consists of an airspace condominium unit. The building and physical structure within which the Property is located will be owned, maintained, and insured by the development’s homeowner’s association. Further, in the event of any conflict between the provisions of the Agreement and the provisions of subdivision A or subdivision B of said fictitious deed of trust, the provisions of the Agreement shall control; provided, however, a conflict shall only be deemed to exist if compliance with the provisions of one of such instruments will result in a violation of the other such instrument.

Trustor has caused this Deed of Trust to be executed as of the date set forth above. “TRUSTOR”
[INSERT SIGNATURE BLOCK]

Page 805 of 1224 ends

882/009410-1018
23556841.5 a04/13/26 -4-
A Notary Public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document.

State of California )
County of Orange )
On _________________________, before me, , (insert name and title of the officer) Notary Public, personally appeared ,
who proved to me on the basis of satisfactory evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument.

I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct.

WITNESS my hand and official seal.

Signature (Seal)

Page 806 of 1224 ends

882/009410-1018
23556841.5 a04/13/26
The following is a copy of Subdivisions A and B of the fictitious Deed of Trust recorded in each county in California as stated in the foregoing Deed of Trust and incorporated by reference in said Deed of Trust as being a part thereof as if set forth at length therein.

A. To protect the security of this Deed of Trust, Trustor agrees:
1) To keep said property in good condition and repair, not to remove or demolish any building thereon; to complete or restore promptly and in a good and workmanlike manner any building which may be constructed, damaged or destroyed thereon and to pay when due all claims for labor performed and materials furnished therefor, to comply with all laws affecting said property or requiring any alterations or improvements to be made thereon; not to commit or permit waste thereof; not to commit, suffer or permit any act upon said property in violation of law; to cultivate, irrigate, fertilize, fumigate, prune and do all other acts which from the character or use of said property may be reasonably necessary, the specific enumerations herein not excluding the general.
2) To provide, maintain and deliver to Beneficiary fire insurance satisfactory to and with loss payable to Beneficiary.

The amount collected under any fire or other insurance policy may be applied by Beneficiary upon any indebtedness secured hereby and in such order as Beneficiary may determine, or at the option of Beneficiary the entire amount so collected or any part thereof may be released to Trustor. Such application or release shall not cure or waive any default or notice of default hereunder or invalidate any act done pursuant to such notice. 3) To appear in and defend any action or proceeding purporting to affect the security hereof or the rights or powers of Beneficiary or Trustee; and to pay all costs and expenses, including cost of evidence of title and attorney’s fees in a reasonable sum, in any such action or proceeding in which Beneficiary or Trustee may appear, and in any suit brought by Beneficiary to foreclose this Deed.
4) To pay: at least ten days before delinquency all taxes and assessments affecting said property, including assessments on appurtenant water stock; when due, all encumbrances, charges and liens, with interest, on said property or any part thereof, which appear to be prior or superior hereto; all costs, fees and expenses of this Trust.

Should Trustor fail to make any payment or to do any act as herein provided, then Beneficiary of Trustee, but without obligation so to do and without notice to or demand upon Trustor and without releasing Trustor from any obligation hereof, may: make or do the same is such manner and to such extent as either may deem necessary to protect the security hereof, Beneficiary or Trustee being authorized to enter upon said property for such purposes; appear in and defend any action or proceeding purporting to affect the security hereof or the rights or powers of Beneficiary or Trustee; pay, purchase, contest or compromise any encumbrance, charge or lien which in the judgment of either appears to be prior or superior hereto; and, in exercising any such powers, pay necessary expenses, employ counsel and pay his reasonable fees. 5) To pay immediately and without demand all sums so expended by Beneficiary or Trustee, with interest from the date of expenditure at the amount allowed by law in effect at the date hereof, and to pay for any statement provided for by law in effect at the date hereof regarding the obligation secured hereby any amount demanded by the Beneficiary not to exceed the maximum allowed by law at the time when said statement is demanded.

B. It is mutually agreed:
1) That any award in connection with any condemnation for public use of or injury to said property or any part thereof is hereby assigned and shall be paid to Beneficiary who may apply or release such moneys received by him in the same manner and with the same effect as above provided for disposition of proceeds of fire or other insurance. 2) That by accepting payment of any sum secured hereby after its due date, Beneficiary does not waive his right either to require prompt payment when due of all other sums so secured or to declare default for failure so to pay. 3) That at any time or from time to time, without liability therefor and without notice, upon written request of Beneficiary and presentation of this Deed and said note for endorsement, and without affecting the personal liability of any person for payment of the indebtedness secured hereby, Trustee may: reconvey any part of said property; consent to the making of any map or plat thereof; join in granting any easement thereon, or join in any extension agreement or any agreement subordinating the lien or charge hereof.
4) That upon written request of Beneficiary stating that all sums secured hereby have been paid, and upon surrender of this Deed and said note to Trustee for cancellation and retention or other disposition as Trustee in its sole discretion may choose and upon payment of its fees, Trustee shall reconvey, without warranty, the property then held hereunder. The recitals in such reconveyance of any matters or facts shall be conclusive proof of the truthfulness thereof. The Grantee in such reconveyance may be described as “the person or persons legally entitled thereto.” 5) That as additional security, Trustor hereby gives to and confers upon Beneficiary the right, power and authority, during the continuance of these Trusts, to collect the rents, issues and profits of said property, reserving unto Trustor the right, prior to any default by Trustor in payment of any indebtedness secured hereby or in the performance of any agreement hereunder, to collect and retain such rents, issues and profits as they become due and payable. Upon any such default, Beneficiary may at any time without notice, either in person, by agent, or be a receiver to be appointed by a court, and without regard to the adequacy of any security for the indebtedness hereby secured, enter upon and take possession of said property or any part thereof, in his own name sue for or otherwise collect such rents, issues, and profits, including those past due and unpaid, and apply the same, less costs and expenses of operation and collection, including reasonable attorney’s fees, upon any indebtedness secured hereby, and in such order as Beneficiary may determine. The entering upon and taking possession of said property, the collecting of such rents, issues and profits and the application thereof as aforesaid, shall not cure or waive any default or notice of default hereunder or invalidate any act done pursuant to such notice. 6) That upon default by Trustor in payment of any indebtedness secured hereby or in the performance of any agreement hereunder, Beneficiary may declare all sums secured hereby immediately due and payable by delivery to Trustee of written declaration of default and demand for sale and of written notice of default and of election to cause to be sold said property, which notice Trustee shall cause to be filed for record. Beneficiary also shall deposit with Trustee this Deed, said note and all documents evidencing expenditures secured hereby.

Page 807 of 1224 ends

882/009410-1018
23556841.5 a04/13/26 -2-
After the lapse of such time as may then be required by law following the recordation of said notice of default, and notice of sale having been given as then required by law, Trustee, without demand on Trustor, shall sell said property at the time and place fixed by it in said notice of sale, either as a whole or in separate parcels, and in such order as it may determine, at public auction to the highest bidder for cash in lawful money of the United States, payable at time of sale. Trustee may postpone sale of all or any portion of said property by public announcement at such time and place of sale, and from time to time thereafter may postpone such sale by public announcement at the time fixed by the preceding postponement. Trustee shall deliver to such purchaser its deed conveying the property so sold, but without any covenant or warranty, express or implied. The recitals in such deed of any matters or facts shall be conclusive proof of the truthfulness thereof. Any person, including Trustor, Trustee, or Beneficiary as hereinafter defined, may purchase at such sale.

After deducting all costs, fees and expenses of Trustee and of this Trust, including cost of evidence of title in connection with sale, Trustee shall apply the proceeds of sale to payment of: all sums expended under the terms hereof, not then repaid, with accrued interest at the amount allowed by law in effect at the date hereof; all other sums then secured hereby; and the remainder, if any, to the person or persons legally entitled thereto. 7) Beneficiary, or any successor in ownership of any indebtedness secured hereby, may from time to time, by instrument in writing, substitute a successor or successors to any Trustee named herein or acting hereunder, which instrument, executed by the Beneficiary and duly acknowledged and recorded in the office of the recorder of the county or counties where said property is situated shall be conclusive proof of proper substitution of such successor Trustee or Trustees, who shall, without conveyance from the Trustee predecessor, succeed to all its title, estate, rights, powers and duties. Said instrument must contain the name of the original Trustor, Trustee and Beneficiary hereunder, the book and page where this Deed is recorded and the name and address of the new Trustee.
8) That this Deed applies to, inures to the benefit of, and binds all parties hereto, their heirs, legatees, devisees, administrators, executors, successors and assigns. The term Beneficiary shall mean the owner and holder, including pledgees, of the note secured hereby, whether or not named as Beneficiary herein. In this Deed, whenever the context so requires, the masculine gender includes the feminine and/or neuter, and the singular number includes the plural. 9) That Trustee accepts this Trust when this Deed, duly executed and acknowledged, is made a public record as provided by law. Trustee is not obligated to notify any party hereto of pending sale under any other Deed of Trust or of any action or proceeding in which Trustor, Beneficiary or Trustee shall be a party unless brought by Trustee.

Page 808 of 1224 ends

882/009410-1018
23556841.5 a04/13/26 -3-
EXHIBIT “A”

LEGAL DESCRIPTION OF THE PROPERTY
That certain real property located in the City of Yorba Linda, County of Orange, State of California, more particularly described as follows:

Page 809 of 1224 ends

PUBLIC WORKS DEPARTMENT
DATE: MAY 19, 2026
TO: HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL
FROM: JAMIE LAI, P.E., DIRECTOR OF PUBLIC WORKS/CITY ENGINEER PREPARED BY: RICK YEE, P.E., DEPUTY PUBLIC WORKS DIRECTOR SUBJECT: ADOPT RESOLUTION NO. 2026-5986 APPROVING THE PAVEMENT MANAGEMENT PLAN UPDATE (MEASURE M2 PROGRAM)

RECOMMENDATION
Adopt Resolution No. 2026-5986 approving the Pavement Management Plan update.

SUMMARY
OCTA’s Measure M2 program requires local agencies to update their Pavement Management Plan (PMP) every two years. The PMP reports current pavement conditions and evaluates future maintenance scenarios based on available funding. The City’s pavement network is currently in good condition with an overall Pavement Condition Index (PCI) of 78. However, the report shows that pavement conditions will decline without increased funding.

DISCUSSION
The City’s pavement consultant completed a field survey of all City-maintained streets and prepared the updated Pavement Management Plan (Attachment 1). The report evaluates pavement conditions, projected roadway deterioration, and future maintenance scenarios based on available funding, construction costs, and anticipated pavement needs. A map of the City’s pavement maintenance zones is included as Attachment 2.

As of December 2025, the City’s overall roadway network has a (PCI) of 78, which is considered good. The City’s most common pavement maintenance treatments are slurry seals for streets with a PCI over 70 and asphalt overlays for streets with a PCI below 70.

Using the current pavement budget of approximately $6 million per year, with assumed annual cost escalation of 3%, the report projects that the City’s overall PCI would decline from 78 to 72 by the end of the planning cycle in 2033.

Page 810 of 1224 ends

P A V E M E N T M A N A G E M E N T P L A N U P D A T E P a g e | 2
The report estimates that a pavement budget of approximately $11 million per year, with annual escalation of 3%, would be needed to maintain the current PCI of 78 at the cycle end point in 2033. Based on the PMP model, increasing the annual pavement budget by $1 million annually roughly increases the ending PCI by one point.

This difference is important because delaying pavement work increases future costs. When roadway maintenance is deferred, pavement conditions decline more quickly and require more intensive treatments later. In general, asphalt overlays cost two to three times more than slurry seals. Rising labor and material costs further increase the cost of deferred work.

Maintaining a PCI above 75 helps the City remain eligible for reduced local match requirements under OCTA’s competitive grant programs. Under the current funding scenario, the City’s overall PCI is projected to fall below 75 in 2030 if additional funding is not provided.

Historically, some pavement work in each maintenance zone has been deferred. As a result, the original seven-year pavement cycle is shifting closer to a 12 to 14-year cycle. This longer cycle increases future costs and makes it more difficult to maintain pavement conditions.

Public Work will continue to explore alternative maintenance and funding options through the Strategic Plan.

FISCAL IMPACT
None.

ALTERNATIVES
Do not approve the recommendation and provide alternative direction.

ATTACHMENTS
Attachment 1 – 2026 Pavement Management Plan Update
Attachment 2 – Pavement Maintenance Zones
Attachment 3 – Resolution No. 2026-5986

Page 811 of 1224 ends

2026 Pavement Management Program
Update
City of Yorba Linda
Public Works
4845 Casa Loma Avenue
Yorba Linda, CA 92886
Final Report
May 2026
2300 E. Katella Ave, Suite 125
Anaheim, CA 92806

Page 812 of 1224 ends

Final Report
2026 Pavement Management Program Update
City of Yorba Linda
Final Report
May 2026
Prepared for:

City of Yorba Linda
Public Works
4845 Casa Loma Avenue
Yorba Linda, CA 92886
Prepared by:

Vivek Jha, P.E. (MD)
Associate
Luis Alberto Rocher Neri, P.E. (NV)
Staff Engineer
Mahmoud Samara, P.E. (AZ)
Staff Engineer
NCE
2300 E. Katella Ave, Suite 125
Anaheim, CA 92806
(657) 275-3018
NCE Project No. 1070.06.30

Page 813 of 1224 ends

2026 Pavement Management Program Update
Executive Summary City of Yorba Linda
ES-3
I. Executive Summary

PURPOSE AND SCOPE
This executive summary presents the findings of the 2026 Pavement Management Program (PMP) update for the City of Yorba Linda street network. The assessment provides decision-makers with a comprehensive evaluation of current pavement conditions, projected maintenance needs, and strategic funding recommendations to preserve the City's street infrastructure investment valued at $711.7 million.

All street inspections were conducted in accordance with ASTM D6433 standards, utilizing walking survey methodology and rigorous quality control evaluations to assess 214.4 centerline miles of Citymaintained streets.

CURRENT NETWORK CONDITIONS
Overall Assessment
The City's street network is currently classified in “Good” condition with a network-wide Pavement Condition Index (PCI) of 78.4. This represents almost a one-point improvement from the 2024 assessment (PCI 77.5), demonstrating the positive impact of the City's focused investment strategy.

Network Composition and Asset Value
Asset Category Measurement Value/Condition
Total Street Network 214.4 centerline miles 45.0 million square feet Estimated Replacement Value Asset valuation $711.7 million Overall Network PCI Weighted average 78.4 (Good)
Condition Distribution by Functional Classification
Functional Class Centerline
Miles
Pavement Area (sq.
ft.)
Weighted Average
PCI
Condition
Rating
MPAH 52.2 13,278,287 (29.5%) 75.5 Good
Local 162.2 31,707,241 (70.5%) 79.7 Good
Total Network 214.4 44,985,528 (100%) 78.4 Good

Page 814 of 1224 ends

2026 Pavement Management Program Update
Executive Summary City of Yorba Linda
ES-4
Pavement Condition Category Distribution
The network's pavement area is distributed across Orange County Transportation Authority (OCTA) condition categories as follows:

COMPARISON TO 2024 ASSESSMENT
Since the previous assessment, notable changes in network conditions include:

Functional Class 2024 PCI 2026 PCI Change
MPAH 72.9 75.5 +2.6 points
Local 79.5 79.7 +0.2 points
Overall Network 77.5 78.4 +0.9 points
The notable improvement in arterial street conditions (+2.6 PCI points) demonstrates the effectiveness of the City's strategic prioritization of major thoroughfares, while local street conditions remain relatively stable (+0.2 points) from the previous assessment.

34.6%

24.7%

30.7%

9.2%

0.8%
Very Good(86-100) Good(75-85) Fair(60-74) Poor(41-59) Very Poor(0-40) Citywide

29.5%

17.7%

39.5%

12.8%

0.6%
MPAH

36.7%

27.7%

27.0%

7.6% 0.9%
Local

Page 815 of 1224 ends

2026 Pavement Management Program Update
Executive Summary City of Yorba Linda
ES-5
It should be noted, however, that short-term inspection results do not necessarily reflect long-term network trends projected through the pavement management scenarios. The current inspection represents observed field conditions, whereas the scenario analyses rely on modeled pavement deterioration and treatment performance assumptions over an extended analysis period. In addition, the City’s robust maintenance practices and project delivery approaches are not always fully captured by the pavement management modeling software, which may underpredict the resulting PCI improvements observed in the field. Nevertheless, due to current and projected increases in construction and paving costs, maintaining similar network performance in the future under the existing funding levels may become increasingly difficult over the long term.

MAINTENANCE AND REHABILITATION STRATEGY
Decision Framework
The Decision Tree treatment recommendations follow the StreetSaver® PCI-based threshold values, rather than the OCTA reporting categories. Accordingly, the recommended maintenance and rehabilitation approach follows established pavement management principles:

Note: Unit prices include construction, inspection, design, contingencies, and mobilization. Costs are differentiated by functional classification to reflect varying pavement design standards.

Page 816 of 1224 ends

2026 Pavement Management Program Update
Executive Summary City of Yorba Linda
ES-6
StreetSaver®
Condition Category Arterial (MPAH) Collector (Local) Residential (Local) Category I
(PCI 90 – 100) Do Nothing Do Nothing Do Nothing
Category II Preventive
(PCI 70 – 89)
Crack Seal + Slurry Seal
($5.9)
Crack Seal + Slurry Seal
($5.9)
Crack Seal + Slurry Seal
($5.9)
Category II Non-Load
(PCI 50 – 69)

2.0" Mill and Overlay +
BR ($45.8/SY)
Crack Seal + Slurry Seal
+ MM + LI + BR
($15.1/SY)
Crack Seal + Slurry Seal
+ MM + LI + BR
($13.6/SY)
Category III Load
(PCI 50 – 69)

2.0" Mill and Overlay +
BR ($45.8/SY)

2.0" Overlay w/wedge
grind + BR
($36.7/SY)

2.0" Overlay w/wedge
grind + BR
($32.5/SY)
Category IV
(PCI 25 – 49)

3.0" Mill and Overlay +
BR ($68.7/SY)

2.0" Mill and Overlay +
BR ($45.3/SY)

2.0" Mill and Overlay +
BR ($42.8/SY)
Category V
(PCI 0 – 24)
Reconstruction
($144.5/SY)
Reconstruction
($126.9/SY)
Reconstruction
($99.6/SY)
Abbreviations: BR: Base Repairs, LI: Localized Inlay, MM: Micro-milling.

Note: Overlay treatment costs for sections within Zones 5 through 7 were reduced by approximately 12.0 percent to account for the significant sidewalk improvements previously completed in these areas.

The above treatment and thicknesses represent the typical methods, thicknesses and are consistent with common City practices. However, the ultimate treatment selection including final pavement thicknesses for any given street segment is determined by the Engineer of Record during the design phase, based on site-specific conditions, field verification, geotechnical information, and projectspecific requirements. The decision tree serves as a standardized planning tool to help guide initial decision-making at the network level.

Previous PMP Reconciliation
Comparison with the 2022 and 2024 PMP cycles shows that the City's network PCI has remained in the 78–79 band over the past four years (79.4 in 2022, 77.5 in 2024, and 78.4 in 2026), with arterial conditions improving 2.6 points to 75.5 in 2026. Over the same period, principal paving unit costs rose substantially, asphalt concrete from $80 to $135 per ton (approximately 69 percent), with cold milling, base repairs, and slurry seal increasing by similar magnitudes while the City's annual pavement allocation declined in nominal terms from $8.2 million in FY 2022/23 to $6.0 million in FY 2028/29. As a result of cost escalation, schedule slippage from delayed zone delivery has shifted Zone 1 work from FY 2025/26 to a later year, reflecting reduced buying power of the same nominal budget.

Takeaway: Holding the City's network in "Good" condition through this period of sharp cost escalation and constrained funding has been a notable accomplishment by City staff and the design team. Their long-term planning, disciplined corridor prioritization, biennial networkwide inspection cadence, and thoughtful treatment selection have kept network performance stable, and the same proactive,

Page 817 of 1224 ends

2026 Pavement Management Program Update
Executive Summary City of Yorba Linda
ES-7
engineering-led approach positions the City to continue maintaining its street network in "Good" condition going forward.

It should be noted, however, that this stability is sensitive to factors largely outside the team's control:
any further escalation in construction costs, or any treatment not performing to its expected service life, would translate directly into a downward trend in network PCI. Additionally, if the annual pavement budget does not keep pace with construction cost increases, the City will eventually need to make difficult judgment calls in order to preserve overall network condition, such as substituting slurry seal with a higher quantity of base repairs in place of a mill and overlay with base repairs simply to pave enough street footage to hold the PCI, or to ensure the network PCI does not drop below 75. If construction-cost escalation continues at the pace observed since 2022, additional funding will be needed in future cycles to sustain current PCI levels, as the same nominal investment will purchase progressively less work.

BUDGET SCENARIOS AND FISCAL PROJECTIONS
NCE analyzed 3 primary funding scenarios in line with OCTA requirements, as well as 3 additional scenarios, to evaluate the fiscal impacts on network conditions and deferred maintenance. The analysis generally covered an eight-year planning horizon (FY 25/26 through FY 33/34), except for Scenario 6 which was evaluated over a 14-year period. All scenarios incorporate an annual inflation rate of 3.0 percent.

Please note Consistent with prior PMP cycles, the budget scenarios are modeled as a 7-year analysis period. The 8-year span shown reflects the addition of FY 26/27 to capture maintenance work originally scheduled in the current cycle but carried over into the following fiscal year; the underlying 7-year modeling assumption is unchanged. Scenario 6 is the exception and is evaluated over a 14-year extended cycle.

Primary Scenarios
Scenario 1: City’s Existing Budget ($6.0 million per year +3% increase) – The result shows that at the City’s current funding level, the network PCI is projected to decrease to 72 by the end of the analysis period. The cost of deferred maintenance will increase from $68.2 million to $103.0 million by the end of FY 33/34.

Scenario 2: Maintain Inspected PCI ($10.5-$11.5 million per year)– In this scenario, additional funds are allocated to increase the network PCI. The results show that the City will need to spend a total of $84.9 million over 8 years to maintain the network PCI at 78. Additionally, deferred maintenance will decrease from $68.2 million to $57.6 million by the end of FY 33/34.

Scenario 3: Increase Inspected PCI ($12.5-$13.0 million per year)– Similar to Scenario 2, this scenario allocates additional funds to increase the inspected PCI. The City will need to spend a total of $91.4 million over 8 years to increase the network PCI to 79. Deferred maintenance will decrease from $68.2 million to $50.5 million by the end of FY 33/34.

Page 818 of 1224 ends

2026 Pavement Management Program Update
Executive Summary City of Yorba Linda
ES-8
Additional Scenarios
Scenario 4: City’s Existing Budget + $1.0M– This scenario allocates an additional $1.0 million per year to the City’s budget. The City will need to spend a total of $60.6 million over 8 years, resulting in a PCI of 74. However, network PCI will be above or equal to 75 for the next 2 PMP cycles. Deferred maintenance will increase from $68.2 million to $90.1 million by the end of FY 33/34.

Scenario 5: City’s Existing Budget + $2.0M– This scenario allocates an additional $2.0 million per year to the City’s budget. The City will need to spend a total of $67.6 million over 8 years, resulting in a PCI of 75. However, network PCI will be above or equal to 75 through FY 32/33, dropping to 74.9 in the final year. Deferred maintenance will increase from $68.2 million to $84.6 million by the end of FY 33/34.

Scenario 6: City’s Existing Budget with Extended Cycle– This scenario follows the same funding assumptions as Scenario 1, consisting of an initial annual budget of $6.0 million with a 3.0 percent annual increase. However, instead of allocating funding to treat 1 zone per year, the analysis assumes each zone is treated over a two-year period, extending the overall program cycle to 14 years (after Zone7B is completed). The City will need to spend a total of $110.2 million over this period, resulting in a PCI of 68 by FY 40/41 (similar trend as of Scenario 1).

Deferred maintenance will increase from $68.2 million to $164.4 million by the end of FY 40/41.

Comparison of Main Scenarios
Scenario 8-Year
Budget
Ending
Network PCI
Ending Deferred
Maintenance
Change in Deferred
Maintenance
1-City’s Existing Budget $53.6M 72 $103.0M +$34.8M (+51%) 2-Maintain Inspected PCI $84.9M 78 $57.6M -$10.6M (-15%) 3-Increase Inspected PCI $91.4M 79 $50.5M -$17.7M (-26%) Comparison of Additional Scenarios
Scenario Total
Budget
Ending
Network PCI
Ending Deferred
Maintenance
Change in Deferred
Maintenance
4-City’s Existing Budget + $1M $60.6M 74 $90.1M +$21.9M (+32%) 5-City’s Existing Budget + $2M $67.6M 75 $84.6M +$16.4M (+24%) 6- City’s Existing Budget with
Extended Cycle $110.2M 68 $164.4M +$96.2M (+141%)

Page 819 of 1224 ends

2026 Pavement Management Program Update
Executive Summary City of Yorba Linda
ES-9
Deferred Maintenance Context
Deferred maintenance represents the accumulated cost of maintenance activities that have been postponed due to funding constraints. This figure includes construction, design, inspection, and contingency costs. The growth in deferred maintenance under Scenarios 1, 4, 5, and 6 reflects the ongoing challenge of addressing accumulated needs while managing current deterioration. Scenarios 2 and 3 are the only options that reduce this liability.

Cost-Effectiveness Analysis
The economic rationale for timely intervention is substantial. A pavement section requiring $10,000 in preventive maintenance today may require $60,000 to $100,000 in rehabilitation costs if deferred, representing a six to ten-fold increase in expenditure. This cost escalation underscores the fiscal prudence of maintaining pavements in good condition rather than allowing deterioration to progress.

2 2
1 1

1 2

2 Inspected 2 2 2 2 2 2 2 1 1 2 2
PCI
iscal year
cenario 1
cenario 2
cenario
cenario
cenario
cenario
ntreated PCI o othing

Page 820 of 1224 ends

2026 Pavement Management Program Update
Executive Summary City of Yorba Linda
ES-10

FINDINGS AND RECOMMENDATIONS
Key Findings

1. Network Performance: The City's street network maintains a "Good" overall condition (PCI

78.4), demonstrating effective asset management over the last years.

2. Investment Impact: The gradual improvement in street condition (+0.9 PCI points) compared to the previous assessment, validates the effectiveness of targeted capital investment in highpriority corridors, despite the substantial increase in unit prices.

3. Cost Escalation: Current deferred maintenance obligations of $68.2 million will continue to increase under Scenarios 1, 4, 5, and 6; only the enhanced funding levels in Scenarios 2 and 3 reduce this liability, highlighting the fiscal challenge of managing an aging infrastructure network.

4. Intervention Timing: The cost differential between preventive maintenance and major rehabilitation (ranging from 6:1 to nearly 10:1) demonstrates the critical importance of timely intervention.

Recommendations
The City Council and staff should consider the following recommendations:

1. Adopt Scenario 2 Funding Level (Primary Recommendation) Increase annual pavement maintenance funding to $10.5-$11.5 million to stabilize network condition and prevent accelerated deterioration. This represents the most fiscally prudent approach to asset preservation given budgetary constraints.

2. Continue Conducting Detailed Pavement Evaluation for Critical Sections Prior to finalizing treatments for streets in "Poor" or "Very Poor" condition, continue the practice of performing subsurface investigations and structural evaluations—including pavement coring—to confirm existing pavement structure, identify underlying deficiencies, and ensure that selected rehabilitation strategies are appropriate. Maintaining this level of investigation will help the City avoid premature failures and optimize long-term pavement performance.

3. Maintain Regular Inspection Cycle
Continue conducting comprehensive network inspections every 2 years to monitor condition trends, validate deterioration models, and support informed decision-making. While a 4-to-5- year cycle remains appropriate for a well-managed PMP program, industry best practices typically recommend more frequent updates for higher-priority streets—approximately every 2 years for MPAH streets and every 4–6 years for the entire network.

Page 821 of 1224 ends

2026 Pavement Management Program Update
Executive Summary City of Yorba Linda
ES-11

4. Update Cost Assumptions Annually
Review and adjust unit prices and treatment strategies annually to reflect current construction market conditions, ensuring budget projections remain accurate and reliable.

CONCLUSION
The City of Yorba Linda has consistently maintained a strong pavement condition, as reflected in sustained network PCI over the last 6 years. This performance demonstrates an effective historical investment strategy. However, the City now faces increasing pressure from escalating unit costs, competing policy priorities, and the ongoing demands of an aging pavement network.

The 6 scenarios presented herein provide a structured framework for decision-making, allowing City leadership to align funding strategies with fiscal capacity and community objectives. Scenario 1 represents a continuation of current funding levels but results in declining network conditions and loss of compliance. Scenario 2 offers a balanced approach, stabilizing network conditions and maintaining compliance with a moderate increase in annual investment. Scenario 3, while requiring the highest level of funding, delivers the most robust long-term outcome by improving overall network condition and minimizing future deferred maintenance liabilities.

Scenarios 4 and 5 represent intermediate strategies. Although they do not maintain the inspected PCI baseline, they provide partial compliance pathways by keeping PCI at or above 75 for a portion—or, in the case of Scenario 5, the entirety—of the remaining analysis period of 7 years, thereby supporting continued eligibility under OCTA Measure M2 requirements.

Scenario 6 evaluates the City’s current implementation strategy in which the City maintains its existing funding framework but extends the maintenance cycle~ 7 more years. While this approach allows funding to be distributed across a broader portion of the network annually and may improve operational flexibility, the extended treatment cycle results in a continued decline in pavement conditions over time similar to Scenario 1.

Timely action is essential. To ensure past investments continue to reap rewards, the City must maintain stable funding combined with sound engineering practices. Streets are long-term assets— keeping them in good condition through preventive maintenance is far more cost-effective than allowing deterioration and paying 5–10 times more for rehabilitation later.

Page 822 of 1224 ends

2026 Pavement Management Program Update
Table of Contents City of Yorba Linda
i
Table of Contents
I. Executive Summary ................................................................................................................. 3 1 Introduction and Background .................................................................................................. 1

1.1 Purpose ..................................................................................................................................... 1 2 Network Summary................................................................................................................... 2 3 Pavement Condition ................................................................................................................ 3 4 Reduction in M2 Local Match................................................................................................... 8 5 Maintenance and Rehabilitation Strategies ............................................................................. 9 6 Pavement Maintenance Schedule and Current Projects......................................................... 12 7 Previous PMP Reconciliation.................................................................................................. 14

7.1 Pavement Condition Index (PCI)............................................................................................. 14

7.2 Unit Cost ................................................................................................................................. 14

7.3 Maintenance Schedule ........................................................................................................... 16

7.4 Takeaway ................................................................................................................................ 17 8 Budget Analysis ..................................................................................................................... 18

8.1 Budget Needs.......................................................................................................................... 18

8.2 Deferred Maintenance............................................................................................................ 19

8.3 Budget Scenarios .................................................................................................................... 20

8.4 Scenario Comparisons............................................................................................................. 28 9 Conclusion and Recommendations ........................................................................................ 31

9.1 Findings................................................................................................................................... 31

9.2 Recommendations.................................................................................................................. 31 List of Figures
Figure 1. Example of Streets with Different PCIs. .........................................................................................4 Figure 2. Percent Pavement Area by Condition Category.............................................................................5 Figure 3. Costs of Maintaining Pavements Over Their Service Lives.............................................................9 igure . City’s Current Projects. .................................................................................................................12 Figure 5. Projected Cost for Asphalt Concrete (ton). ..................................................................................15 igure . 2. ” Mill and Overlay with Base Repairs Cost ..............................................................................16 Figure 7. Section PNDRSAWY – 10 (Ponderosa Way). Inspected PCI: 74....................................................19 Figure 8. PCI vs Deferred Maintenance for Scenario 1................................................................................22

Page 823 of 1224 ends

2026 Pavement Management Program Update
Table of Contents City of Yorba Linda
ii
Figure 9. PCI vs Deferred Maintenance for Scenario 2................................................................................23 Figure 10. PCI vs Deferred Maintenance for Scenario 3..............................................................................24 Figure 11. PCI vs Deferred Maintenance for Scenario 4..............................................................................25 Figure 12. PCI vs Deferred Maintenance for Scenario 5..............................................................................26 Figure 13. PCI vs Deferred Maintenance for Scenario 6..............................................................................27 Figure 14. Comparison of Annual PCI by Scenario. .....................................................................................29 Figure 15. Comparison of Annual Deferred Maintenance by Scenario.......................................................29 Figure 16. Comparison of Pavement Condition by FY 33/34 Breakdown by Scenarios. .............................30 List of Tables
Table 1. Network Summary Statistics by Functional Class............................................................................2 Table 2. OCTA Pavement Condition Categories ............................................................................................5 Table 3. Pavement Condition Summary - Citywide.......................................................................................6 Table 4. Pavement Condition Summary – MPAH Network ...........................................................................6 Table 5. Pavement Condition Summary – Local Network .............................................................................7 Table 6. AC Pavement Maintenance and Rehabilitation Decision Tree......................................................11 Table 7. Pavement Maintenance Schedule (Scenario 1-5)..........................................................................13 Table 8. Pavement Maintenance Schedule (Scenario 6).............................................................................13 Table 9. Comparison of 2024-2 2 PCI for the City’s etwork...................................................................14 Table 10. Asphalt Paving Costs Assumptions, 2022-2026...........................................................................14 Table 11. Maintenance Schedule, 2022-2026.............................................................................................16 Table 12. Budget Needs...............................................................................................................................18 Table 13. Deferred Maintenance Calculation Example...............................................................................20 Table 14. Budget Scenario Analysis Summary (Primary Scenarios). ...........................................................21 Table 15. Budget Scenario Analysis Summary (Additional Scenarios). .......................................................21 Table 16. Summary of Results from Scenario 1 Analysis.............................................................................22 Table 17. Summary of Results from Scenario 2 Analysis.............................................................................23 Table 18. Summary of Results from Scenario 3 Analysis.............................................................................24 Table 19. Summary of Results from Scenario 4 Analysis.............................................................................25 Table 20. Summary of Results from Scenario 5 Analysis.............................................................................26 Table 21. Summary of Results from Scenario 6 Analysis.............................................................................27

Page 824 of 1224 ends

2026 Pavement Management Program Update
Table of Contents City of Yorba Linda
iii
List of Appendices
Appendix 1
Section Description Inventory – Average (Weighted by Area) PCI Appendix 2
Work Plan per Scenario 1
Appendix 3
Pavement Condition GIS Maps
Appendix 4
OCTA Pavement Management Plan Agency Submittal
Appendix 5
Previous PMP Reconciliation Memo

Page 825 of 1224 ends

2026 Pavement Management Program Update
Introduction and Background City of Yorba Linda
Final Report May 2026
1 1 Introduction and Background
Nichols Consulting Engineers, Chtd. (NCE) was selected by the City of Yorba Linda to perform an update of the City’s Pavement Management Plan (PMP). In general, PMPs are “designed to provide objective information and useful data so that managers can make more consistent, cost effective and defensible decisions related to the preservation of a pavement network.” The goal of this effort is to update the PMP with current pavement conditions and to perform funding analyses to help inform and educate policy makers as well as to comply with the Orange County Transportation Authority’s (OCTA) Measure M2 Program.

To update the City’s PMP, CE performed walking pavement condition surveys on the entire street network in compliance with ASTM D64331 as required by OCTA in the “Citywide Pavement Management Plan Guidelines”.

Please note, the surveys did not include non-pavement issues such as traffic, safety and street hazards, geometric or drainage issues, shoulders, sidewalks, curb and gutters, or immediate maintenance needs.

After inspection, all survey data was entered into the City’s StreetSaver® database, and pavement condition index (PCI) calculations were performed. NCE then met with City staff and reviewed and updated the City’s decision tree, including maintenance and rehabilitation (M&R) strategies and treatment unit prices. A budget needs analysis was then performed, and 5 budget scenarios were analyzed for the street network.

This report answers the following questions for the City of Yorba Linda:
• What does the City’s pavement network include, and what is its current condition? • What are the City’s current M&R strategies?
• How much funding is required to perform all the needed M&R treatments over the next 8 years? • What effect will the City’s existing funding and other funding levels have on the network condition and deferred maintenance?

1.1 Purpose
The purpose of this report is to assist policy makers in using the results of the PMP. This report analyses different levels of funding and maximizes the return from expenditure by selecting the most cost-effective repairs.

This report also assists the City with identifying M&R priorities specific to the City’s needs, and highlights options for improving the current PCI. Using "what-if" analyses with StreetSaver® software, various funding scenarios were explored by adjusting available budgets for pavement maintenance and repair and modifying the maintenance schedule cycle. The results illustrate how different funding strategies could impact the condition of the City's streets over the next 7 to 14 years.

The 2026 PMP update includes assessing the entire City’s Street network (MPAH and Local City-maintained pavement network). The assessment was done in October 2025 via a walking survey method for the entire street network within City’s jurisdiction. The PMP report offers a comprehensive understanding of the overall infrastructure condition and facilitates effective planning and maintenance strategies for the City. 1 ASTM. "ASTM D6433." Standard Practice for Roads and Parking Lots Pavement Condition Index Surveys.

Page 826 of 1224 ends

2026 Pavement Management Program Update
Network Summary City of Yorba Linda
Final Report May 2026
2 2 Network Summary
The City is responsible for maintaining approximately 214.4 centerline miles of streets, representing a substantial investment of approximately $711.7 million. The street network includes 52.2 centerline miles of Master Plan of Arterial Highways (MPAH) streets and 162.2 centerline miles of local streets. In October 2025, NCE performed a condition survey for the City’s entire network. Table 1 summarizes the street network by functional class.

Table 1. Network Summary Statistics by Functional Class Functional Class Centerline
Mileage
Percent
Area
Weighted
Average PCI1 Condition
MPAH 52.2 29.5% 75.5 Good
Local 162.2 70.5% 79.7 Good
Total 214.4 100.0% 78.4 Good
Street pavements are one of the City’s most valuable assets, and the total street network replacement cost is estimated to be approximately $711.7 million. This can be viewed as the value of the pavement network and is the amount needed to fund a reconstruction of the entire paved network. It does not include related infrastructure assets such as sidewalks, signals, markings, signs, or storm drains.

Page 827 of 1224 ends

2026 Pavement Management Program Update
Pavement Condition City of Yorba Linda
Final Report May 2026
3 3 Pavement Condition
The PCI is a measurement of pavement grade or condition and ranges from 0 to 100. A newly constructed street will have a PCI of 100, while a street in very poor condition will have a PCI of 25 or less. The pavement condition is primarily affected by the climate, traffic loads and volumes, construction materials, and age. The symptoms manifested by the pavement as it ages or fails are determined by the distress types that are present, which for asphalt concrete pavements include:

Asphalt Concrete Pavements:
• Alligator (Fatigue) Cracking • Patching and Utility Cut Patching • Bleeding • Polished Aggregate
• Block Cracking • Potholes
• Bumps & Sags • Railroad Crossing
• Corrugation • Rutting
• Depression • Shoving
• Edge Cracking • Slippage Cracking
• Joint Reflection Cracking • Swell
• Lane/Shoulder Drop-Off • Raveling
• Longitudinal/Transverse Cracking • Weathering
The photographs in Figure 1 illustrate the City’s asphalt concrete streets and show a range of PCIs.

Page 828 of 1224 ends

2026 Pavement Management Program Update
Pavement Condition City of Yorba Linda
Final Report May 2026
4 Figure 1. Example of Streets with Different PCIs.

Page 829 of 1224 ends

2026 Pavement Management Program Update
Pavement Condition City of Yorba Linda
Final Report May 2026
5 The Orange County Transportation Authority (OCTA) PCI scale is divided into 5 general condition categories.

Pavements in “Very Good” condition have a PCI at or above , pavements in “Good” condition have a PCI between and , pavements in “ air” condition have a PCI between and , pavements in “Poor” condition have a PCI between 1 and , and finally pavements in “Very Poor” condition have a PCI at or below

40. Table 2 shows the PCI range for each condition category, which is outlined by OCTA in the “Countywide Pavement Management Plan Guidelines.” These PCI ranges are established for consistent reporting across all OCTA agencies, but do not dictate PCI ranges for recommended treatments established in the agency’s ecision Tree.

Table 2. OCTA Pavement Condition Categories
Condition Category PCI Range Description
Very Good 86 – 100 Pavements with little or no distress.

Good 75 – 85 Pavements which have some distresses which are predominantly non-load related.

Fair 60 – 74 Pavements which have a significant level of distress which is predominantly load related.

Poor 41 – 59 Pavements which have major distress.

Very Poor 0 – 40 Pavements which have an extensive amount of distress.

The City’s overall weighted average PCI for the network in October 2025 is 78.4, which places the overall network pavement condition in the “Good” category. igure 2 breaks down the current network PCI by functional classification.

Figure 2. Percent Pavement Area by Condition Category.

34.6%

24.7%

30.7%

9.2%

0.8%
Very Good(86-100) Good(75-85) Fair(60-74) Poor(41-59) Very Poor(0-40) Citywide

29.5%

17.7%

39.5%

12.8%

0.6%
MPAH

36.7%

27.7%

27.0%

7.6% 0.9%
Local

Page 830 of 1224 ends

2026 Pavement Management Program Update
Pavement Condition City of Yorba Linda
Final Report May 2026
6 Table 3 through Table 5 provide a pavement condition breakdown for the Citywide street network as well as the MPAH and Local networks by PCI range and condition category. Overall, 34.6 of the City’s Street Network area is in “Very Good” condition, 24.7 is in “Good” condition, 30.7 is in “ air” condition, 9.2 is in “Poor” condition, and

0.8 is in “Very Poor” condition.

Table 3. Pavement Condition Summary - Citywide
Condition Category PCI Range Centerline
Mileage
Percent
Centerline
Mileage
Pavement Area
(sf) Percent Area
Very Good 86 – 100 75.9 35.4% 15,567,384 34.6%
Good 75 – 85 55.2 25.7% 11,133,400 24.7%
Fair 60 – 74 63.8 29.8% 13,803,240 30.7%
Poor 41 – 59 17.6 8.2% 4,118,442 9.2%
Very Poor 0 – 40 1.9 0.9% 363,062 0.8%
Totals 214.4 100.0% 44,985,528 100.0%
Table 4. Pavement Condition Summary – MPAH Network
Condition Category PCI Range Centerline
Mileage
Percent
Centerline
Mileage
Pavement Area
(sf) Percent Area
Very Good 86 – 100 15.6 30.0% 3,916,380 29.5%
Good 75 – 85 10.5 20.1% 2,343,643 17.7%
Fair 60 – 74 20.1 38.5% 5,246,421 39.5%
Poor 41 – 59 5.7 10.8% 1,695,995 12.8%
Very Poor 0 – 40 0.3 0.6% 75,848 0.6%
Totals 52.2 100.0% 13,278,287 100.0%

Page 831 of 1224 ends

2026 Pavement Management Program Update
Pavement Condition City of Yorba Linda
Final Report May 2026
7 Table 5. Pavement Condition Summary – Local Network
Condition Category PCI Range Centerline
Mileage
Percent
Centerline
Mileage
Pavement Area
(sf) Percent Area
Very Good 86 – 100 60.3 37.2% 11,651,004 36.7%
Good 75 – 85 44.7 27.5% 8,789,757 27.7%
Fair 60 – 74 43.7 26.9% 8,556,819 27.0%
Poor 41 – 59 11.9 7.3% 2,422,447 7.6%
Very Poor 0 – 40 1.6 1.0% 287,214 0.9%
Totals 162.2 100.% 31,707,241 100.0%

Page 832 of 1224 ends

2026 Pavement Management Program Update
Reduction in M2 Local Match City of Yorba Linda
Final Report May 2026
8 4 Reduction in M2 Local Match
The OCTA Measure M Regional Capacity Program (Project O) - which provides Measure M2 grant funding for arterial, intersection, and freeway/arterial improvements, includes an incentive for successful implementation of a PMP. The incentive is a 10 percent reduction in local matching fund requirements if either of the following conditions apply:
a) Show measurable improvement of paved street conditions during the previous reporting period defined as an overall weighted (by area) average system improvement of 1 PCI point with no reduction in the overall weighted (by area) average PCI in the MPAH or local street categories; – OR –
b) Have street pavement conditions for the overall network during the previous reporting period within the highest 20 percent of the scale for street pavement conditions in conformance with OCTA Ordinance No.3, defined as a PCI of 75 or higher.

The City’s PCI meets the requirements as noted in the preceding paragraph (b) by keeping the overall network PCI greater than 75, with the MPAH street network at PCI of 76 and the Local street network showing PCI at 80.

The City will therefore be eligible for the 10 percent reduction in local matching fund requirements for the next 2-year cycle.

Page 833 of 1224 ends

2026 Pavement Management Program Update
Maintenance and Rehabilitation Strategies City of Yorba Linda Final Report May 2026
9 5 Maintenance and Rehabilitation Strategies
As discussed previously, the Orange County Transportation Authority reporting categories do not directly correspond to the Decision Tree breakpoint values adopted by the City. For the City of Yorba Linda, treatment recommendations are defined using condition thresholds established within StreetSaver® (Figure 3), which are specifically calibrated to guide maintenance and rehabilitation decisions based on PCI ranges.

In general, surface treatments—such as crack sealing and slurry sealing—are applied when pavements are in “Good” to “Very Good” condition. These treatments are classified as preventive maintenance and correspond to Category I in StreetSaver®. As pavement condition decline, more intensive interventions become necessary.

Slurry seals with localized base repairs, overlays and full-depth structural replacements are implemented at lower PCI levels and are categorized as minor resurfacing, major resurfacing, or reconstruction, respectively (Categories II through IV in StreetSaver®).

Based on a discussion with City staff, a detailed M&R decision tree was prepared. This determined the most effective and realistic treatments for each group of streets by functional class and condition category. However, the ultimate treatment selection including final pavement thicknesses for any given street segment is determined by the Engineer of Record during the design phase, based on site-specific conditions, field verification, geotechnical information, and project-specific requirements. The decision tree serves as a standardized planning tool to help guide initial decision-making at the network level Figure 3. Costs2 of Maintaining Pavements Over Their Service Lives.

Pavement maintenance follows the old colloquial saying of "pay now or pay more later". History has shown that it costs much less to maintain streets in good condition than to repair streets that have failed. By letting 2 In addition to the contractor’s prices, unit prices are loaded to include staff time, design, construction management, contingencies, and non-asphalt concrete related work.

Page 834 of 1224 ends

2026 Pavement Management Program Update
Maintenance and Rehabilitation Strategies City of Yorba Linda Final Report May 2026
10 pavements deteriorate, residential streets that once cost $5.9 per square yard to slurry seal may in a few years cost as much as $68.7 per square yard to rehabilitate. The costs shown in the chart above are based on recent bids received by the City. The pavement deterioration curve shown above describes how pavements deteriorate over time.

Pavements with PCI values greater than or equal to (“Very Good” condition) generally do not require maintenance or rehabilitation treatments beyond routine activities. Approximately 2 .1 percent of the City’s network currently falls within this category, including 20.6 percent of the Local street network and 6.5 percent of the MPAH network.

Pavements in “Good” and “Very Good” condition show some form of distress that require more than preventive maintenance. At this point, a well-designed pavement will have a remaining of 65 percent of its life, and a slurry seal will be required to bring its condition back to “Very Good”. Pavements in the “ air” condition show some form of distress that require more than preventive maintenance. At this point, a well-designed pavement will have a remaining of 50 percent of its life, and either a slurry seal with some base repairs or a 2-inch mill and overlay with base repairs will be required (depending on the load and non-load related distresses). A key element of a pavement management repair strategy is to keep streets in the “Good” to “ air” categories from deteriorating. This is particularly true for streets in the “ air” range, since pavement deterioration will accelerate if left untreated.
or pavements in the “Poor” category, approximately 30 percent of service life is left—the 2-to-3-inch mill and overlay with a higher percent of base repairs would be required to increase the PCI above 70. Pavements in “Very Poor” condition are near the end of their service lives and often exhibit severe forms of distress such as potholes, rutting, and extensive cracking. At this stage, reconstruction is typically required. The reconstruction includes removing and replacing the asphalt surface.

The City’s maintenance and rehabilitation decision tree for both MPAH and Local networks are generalized in Table 6 below. It must be noted that overlay treatment costs for sections within Zones 5 through 7 were reduced by approximately 12.0 percent to account for the significant sidewalk improvements previously completed in these areas.

Page 835 of 1224 ends

2026 Pavement Management Program Update
Maintenance and Rehabilitation Strategies City of Yorba Linda Final Report May 2026
11 Table 6. AC Pavement Maintenance and Rehabilitation Decision Tree StreetSaver®
Condition Category Arterial (MPAH) Collector (Local) Residential (Local) Category I
(PCI 90 – 100) Do Nothing Do Nothing Do Nothing
Category II Preventive
(PCI 70 – 89)
Crack Seal + Slurry Seal
($5.9)
Crack Seal + Slurry Seal
($5.9)
Crack Seal + Slurry Seal
($5.9)
Category II Non-Load
(PCI 50 – 69)

2.0" Mill and Overlay + BR
($45.8/SY)
Crack Seal + Slurry Seal +
MM + LI + BR
($15.1/SY)
Crack Seal + Slurry Seal +
MM + LI + BR
($13.6/SY)
Category III Load
(PCI 50 – 69)

2.0" Mill and Overlay + BR
($45.8/SY)

2.0" Overlay w/wedge grind
+ BR
($36.7/SY)

2.0" Overlay w/wedge grind
+ BR
($32.5/SY)
Category IV
(PCI 25 – 49)

3.0" Mill and Overlay + BR
($68.7/SY)

2.0" Mill and Overlay + BR
($45.3/SY)

2.0" Mill and Overlay + BR
($42.8/SY)
Category V
(PCI 0 – 24)
Reconstruction
($144.5/SY)
Reconstruction
($126.9/SY)
Reconstruction
($99.6/SY)
BR: Base Repairs, LI: Localized Inlay, MM: Micro-milling.

Page 836 of 1224 ends

2026 Pavement Management Program Update
Current Projects City of Yorba Linda
Final Report May 2026
12 6 Pavement Maintenance Schedule and Current Projects The City is organized into 7 geographic zones (Zones 1 through 7) for pavement management planning. For the FY 25/26 maintenance program scheduled for summer/fall 2026, the City’s objective is to complete the remaining work in Zone 7 (noted as Zone 7B) as well as MPAH work in Yorba Linda Boulevard, and Esperanza Road as shown in Figure 4.

Figure 4. City’s Current Projects.

Following completion of Zone 7, the maintenance cycle is assumed to restart with Zone 1 (Scenarios 1 through 5), proceeding sequentially at a rate of one zone per year for Scenario 1. Accordingly, the analysis period spans eight years: it includes the committed FY 25/26 maintenance program improvements (Zone 7B) and the projected treatment cycle covering Zones 1 through 7 in subsequent years. Table 7 summarizes the assumed maintenance schedule and identifies the zone analyzed for each fiscal year.

Based on the past construction cycle, it has typically taken the City anywhere between 1.5 – 2 years to finish all the work required to be done in a zone. To capture the impact of that workflow (1.5-2 years for each zone), the project team developed Scenario 6. In the case of Scenario 6, each Zone will be treated in 2 years (as a more conservative estimate), resulting in an additional 7 years being added to the overall analysis period as shown in Table 8.

Page 837 of 1224 ends

2026 Pavement Management Program Update
Current Projects City of Yorba Linda
Final Report May 2026
13 Table 7. Pavement Maintenance Schedule (Scenario 1-5) Fiscal Year Maintenance Program Analysis Year City’s Zone FY 26/27 FY 25/26 1 7B
FY 27/28 FY 26/27 2 1
FY 28/29 FY 27/28 3 2
FY 29/30 FY 28/29 4 3
FY 30/31 FY 29/30 5 4
FY 31/32 FY 30/31 6 5
FY 32/33 FY 31/32 7 6
FY 33/34 FY 32/33 8 7
Table 8. Pavement Maintenance Schedule (Scenario 6)
Fiscal Year Maintenance Program Analysis Year City’s Zone FY 26/27 FY 25/26 1 7B
FY 27/28 FY 26/27 2 1
FY 28/29 FY 27/28 3 1
FY 29/30 FY 28/29 4 2
FY 30/31 FY 29/30 5 2
FY 31/32 FY 30/31 6 3
FY 32/33 FY 31/32 7 3
FY 33/34 FY 32/33 8 4
FY 34/35 FY 33/34 9 4
FY 35/36 FY 34/35 10 5
FY 36/37 FY 35/36 11 5
FY 37/38 FY 36/37 12 6
FY 38/39 FY 37/38 13 6
FY 39/40 FY 38/39 14 7
FY 40/41 FY 39/40 15 7

Page 838 of 1224 ends

2026 Pavement Management Program Update
PMP Reconciliation City of Yorba Linda
Final Report May 2026
14 7 Previous PMP Reconciliation
Before proceeding with the budget analysis, it is important to reconcile and compare the current pavement management results with those from the previous PMP updates. The purpose of this section is to evaluate how the City’s network has evolved over the last years by comparing changes in overall PCI, differences in projected goals, and updates in unit costs. This reconciliation provides essential context for interpreting current budget needs and budget scenarios presented in the next section. Moreover, a detailed memo is attached in Appendix 5 regarding this section.

7.1 Pavement Condition Index (PCI)
Since the past assessment, the overall street network PCI has seen a gradual improvement in both MPAH and Local streets.

Table 9. Comparison of 2024-2026 PCI for the City’s Network.

Functional Class 2022 Weighted
Average PCI
2024 Weighted
Average PCI
2026 Weighted
Average PCI
MPAH 82.6 72.9 75.5
Local 78.1 79.5 79.7
Total 79.4 77.5 78.4

7.2 Unit Cost
Table 9 below summarizes the principal paving item costs adopted in the last 3 PMP cycles. These items represent the primary cost drivers for the City’s program, as they directly control the cost of preventive maintenance, overlays, and localized repairs across both Local and MPAH streets.

Table 10. Asphalt Paving Costs Assumptions, 2022-2026.

Functional Class 2022 PMP* 2024 PMP 2026 PMP
Asphalt Concrete (ton) $80.0 $105.0 $135.0
Cold Mill (sy) $3.0 $2.4 $4.5
4" Base Repairs (sf) $6.5 $6.6 $10.0
Slurry Seal (sy) $1.5 $2.2 $2.5
*Note: The 2022 PMP was initially developed using unit costs established near the end of 2021 and beginning of 2022.

Because asphalt prices increased substantially shortly thereafter, the decision tree was updated in May 2022 and overall treatment costs were increased by approximately 10 percent. For this comparison, the adjusted 2022 values are assumed to be $88.0/ton for asphalt concrete, $3.3/sy for cold milling, $7.2/sf for 4-inch base repairs, and $1.7/sy for slurry seal so that the 2022 baseline more closely reflects actual market conditions at the time of implementation.

Using the values from each PMP and the standard assumption of 3.0 percent annual inflation, the expected future cost trajectory can be compared against the cost actually observed in the next PMP cycle. Figure 5 shows that actual market prices materially exceeded the amounts that would have been projected using standard escalation. In other words, the inflation factor built into the earlier PMP reports was assumed reasonable for long-term planning but proved insufficient to capture the abrupt post-2021 cost escalations experienced by the construction market.

Page 839 of 1224 ends

2026 Pavement Management Program Update
PMP Reconciliation City of Yorba Linda
Final Report May 2026
15 Figure 5. Projected Cost for Asphalt Concrete (ton).

Given the May 2022 treatment cost update, the effective asphalt concrete unit cost in 2022 would still have been well below the value used in the 2026 PMP report. This difference is important because asphalt concrete is only one component of a treatment, yet it affects nearly every paving strategy in the decision tree. The increase in individual bid items translated directly into higher overall treatment costs. As shown in Figure 6, the total cost of a typical 2.0-inch mill and overlay treatment for collectors increased from about $26.1/SY in the original 2022 PMP to $45.3/SY in the 2026 PMP, an increase of approximately 74 percent. Even when the 10 percent update is considered, the comparable cost still increases from about $31.4/SY to $45.3/SY, roughly a 44 percent increase.

This escalation is not limited to paving materials. Non-paving items such as mobilization, traffic control, striping support, and similar construction costs also tend to rise in the same market environment because design, construction management, and contingency are typically calculated as percentages of construction cost, soft costs also increase as the direct treatment cost increases.

A significant contributor to recent project costs in Zones 5 through 7 has been the extensive curb ramp, sidewalk, and PCC-related work associated with ADA compliance upgrades and localized concrete reconstruction activities. These improvements represented a considerable portion of both the direct construction costs and associated soft costs reflected in recent maintenance projects. However, since much of this required concrete and ADA-related work has already been completed during the current maintenance cycle, future treatment costs in these zones are anticipated to be lower. As discussed in Section 5, overall treatment costs within Zones 5 through 7 are expected to decrease by approximately 12 percent compared to the most recent construction cycle.

However, it should be noted that for the analysis presented in this report, all treatment costs were kept at the higher concrete-driven levels rather than applying the anticipated reduction, since Zones 5 through 7 will not be revisited for almost a decade and future cost trends remain uncertain, and it was therefore considered preferable to carry the higher costs through the analysis to remain on the conservative side.

Page 840 of 1224 ends

2026 Pavement Management Program Update
PMP Reconciliation City of Yorba Linda
Final Report May 2026
16 Figure 6. 2.0” Mill and Overlay with Base Repairs Cost

7.3 Maintenance Schedule
The effect of cost escalation is visible in the implementation schedule. Based on the 2022 and 2024 PMP updates, the City would have been expected to be transitioning into Zone 1 by FY 2025-2026. Instead, work in Zone 7 is still carrying into FY 2025-2026, and Zone 1 has shifted to a later year, Table 11. This is a practical demonstration of reduced buying power: even when the City continues to invest in the pavement network, the same budget no longer advances through the zones at the pace assumed in the prior work plans. The delay also has a second-order effect because the future zones continue to age while they wait, which causes the programmed PCI at treatment year to be lower than originally projected Table 11. Maintenance Schedule, 2022-2026.

Fiscal Year PMP 2022 PMP 2024 Work done
FY 2022-2023 Z6 Z5/Z6
FY 2023-2024 Z5/Z7 Z5/Z6/Z7
FY 2024-2025 Z7 Z7 Z7
FY 2025-2026 Z1 Z1 Z7 (pending)
FY 2026-2027 Z2 Z2 Z1 (pending)
The difference between prior PMP projections and actual delivery reflects the combined effect of multiple factors: unit cost escalation in the construction market, the City’s pavement budget trajectory relative to those increases, the shortfall between planned and completed work, and divergences between projected and inspected pavement conditions. Each factor has contributed to the 2026 outcome, and they act in combination rather than in isolation. The relative contribution of each factor cannot be quantified without a formal sensitivity analysis, and the data presented here do not support attributing the gap to any single cause. As projects are deferred, the affected sections continue to deteriorate, some cross pavement condition thresholds, and the modeled treatment recommendation shifts to more costly rehabilitation treatments. Going forward, annual work plans and budget assumptions will benefit from monitoring treatment unit costs closely and updating assumptions when conditions shift materially from prior projections.

Page 841 of 1224 ends

2026 Pavement Management Program Update
PMP Reconciliation City of Yorba Linda
Final Report May 2026
17 7.4 Takeaway
Holding the City's pavement network in "Good" condition over the past four years has been a notable accomplishment by City staff and the design team. Across three consecutive PMP cycles, the network-wide PCI has remained in the 78–79 band, 79.4 in 2022, 77.5 in 2024, and 78.4 in 2026, a level of stability that is especially significant given the construction-market conditions over the same period. Asphalt concrete unit cost rose from $80 to $135 per ton (approximately 69 percent), with cold milling, base repairs, and slurry seal increasing by similar magnitudes, while the City's annual pavement allocation moved from $8.2 million in FY 2022/23 to $6.0 million in FY 2028/29, a decline in nominal terms and a substantially larger decline in real, inflation-adjusted purchasing power. That the network's condition has not slipped under those pressures is a direct result of the long-term planning, disciplined corridor prioritization, biennial inspection cadence, and overall appropriate cost-effective treatment selection consistently applied by City staff and the design team.

This same proactive and engineering-led approach positions the City to continue maintaining its street network in "Good" condition going forward.

It should be noted, however, that this stability is sensitive to factors that are largely outside the design team's direct control. Any further escalation in construction costs beyond what has been assumed in this report, or any treatment not performing to its expected service life, would translate directly into a downward trend in network PCI in the coming cycles, as the modeled benefit of each year's program depends on both the unit cost at the time of construction and the full design life being realized in the field. Additionally, if the annual pavement budget does not keep pace with continued construction cost increases, the City will eventually need to make difficult judgment calls in order to preserve overall network condition, such as substituting a slurry seal with a higher quantity of base repairs in place of a mill and overlay with base repairs simply to pave enough street footage to hold the PCI, or alternatively to ensure that the network PCI does not drop below 75. If constructioncost escalation continues at the pace observed since 2022, additional funding will be needed in future cycles to sustain current PCI levels, as the same nominal investment will purchase progressively less work, but the framework, planning discipline, and technical judgment needed to deploy that funding effectively are already in place.

Page 842 of 1224 ends

2026 Pavement Management Program Update
Budget Analysis City of Yorba Linda
Final Report May 2026
18 8 Budget Analysis
Based on the principle that it costs less to maintain streets in good condition than it does to repair those that have failed, cost-effective PMPs employ strategies that eliminate the deferred maintenance and then maintain the network with ongoing preventive maintenance. Such strategies bring the network condition to an optimal PCI that can be maintained over time.

Please note that, consistent with prior PMP cycles, the budget analysis (needs and scenarios) are modeled as a 7- year analysis period for all scenarios except Scenario 6. For this update, however, the analysis was extended by one additional year and run as an 8-year analysis in order to capture the FY 26/27 maintenance program, which represents the carryover of work originally scheduled in the current cycle but completed in the following fiscal year. The underlying 7-year modeling assumption remains unchanged; the additional year reflects implementation timing only and does not alter the scenario framework or the per-cycle funding basis.

8.1 Budget Needs
The first step in developing a cost-effective strategy is to determine, assuming an unconstrained budget, the total maintenance budget “needs” of the network, i.e., the funding required for every street in the network to reach optimal conditions based on the policy established in the decision tree. This type of budget, that addresses all the deferred maintenance in the first year, is known as front-loaded. For the City, the cost of treatment(s) over the analysis period was calculated by multiplying unit costs by pavement section area, and an annual inflation rate of 3.0 percent.

The budget needs are estimated to be approximately $133.2 million over the next 8 years. Of the total budget needs, approximately $89.8 million (nearly 67.4 percent) is devoted to rehabilitation and reconstruction, while the rest is allocated for more preventive maintenance. If the City follows this “ideal” strategy, the average network PCI will increase to 85.1 by FY 33/34. Table 12 below shows the impacts of expenditure on the PCI, assuming an unconstrained budget.

Table 12. Budget Needs.

Fiscal Year Inspected 26/27 27/28 28/29 29/30 30/31 31/32 32/33 33/34 Total Needs
($M)
MPAH N/A $36.1 $5.5 $3.1 $0.1 $0.2 $7.0 $2.3 $0.7 $55.0 Local N/A $32.0 $7.7 $7.5 $2.6 $2.2 $13.4 $7.2 $5.6 $78.2 Overall N/A $68.1 $13.2 $10.6 $2.7 $2.4 $20.4 $9.5 $6.3 $133.2 Rehabilitation
($M)
MPAH N/A $34.3 $4.1 $2.9 $0.0 $0.0 $0.0 $0.0 0 $41.3
Local N/A $26.9 $5.4 $4.9 $1.4 $1.6 $3.3 $3.4 1.6 $48.5 Overall N/A $61.2 $9.5 $7.8 $1.4 $1.6 $3.3 $3.4 $1.6 $89.8 Preventive
Maintenance
($M)
MPAH N/A $1.8 $1.4 $0.2 $0.1 $0.2 $7.0 $2.3 0.7 $13.7
Local N/A $5.1 $2.3 $2.6 $1.2 $0.6 $10.1 $3.8 4 $29.7
Overall N/A $6.9 $3.7 $2.8 $1.3 $0.8 $17.1 $6.1 $4.7 $43.4 PCI
MPAH N/A 92.7 90.0 88.6 86.4 84.7 87.9 87.4 86.0 N/A
Local N/A 86.5 85.8 85.7 84.4 83.2 85.1 85.1 84.8 N/A
Overall N/A 88.4 87.0 86.6 85.0 83.6 85.9 85.8 85.1 NA/

Page 843 of 1224 ends

2026 Pavement Management Program Update
Budget Analysis City of Yorba Linda
Final Report May 2026
19 8.2 Deferred Maintenance
As previously defined, deferred maintenance refers to maintenance activities that were either not performed as scheduled or were postponed to a future period due to insufficient funding. In the pavement management database, deferred maintenance is calculated using the inspected or projected PCI, the Decision Tree–assigned treatment, the corresponding unit costs, and the assumed annual inflation rate.

Figure 7 illustrates this concept using the example of section PONDRSAWY - 01 on Ponderosa Way. The inspected PCI of places the section in the “ air” category. Based on the ecision Tree, the recommended treatment is slurry seal, at an approximate unit cost of $5.9/SY. For this section, the total cost to complete the treatment today would be approximately $23,500.

Figure 7. Section PNDRSAWY – 10 (Ponderosa Way). Inspected PCI: 74.

A common misconception is that deferred maintenance can be calculated simply by applying inflation to the current cost if the treatment is delayed by 2, 3, or 5 years. However, this overlooks the fact that pavement deterioration continues during the delay. When the PCI drops below the next decision breakpoint, a more intensive and costly rehabilitation strategy becomes increasingly likely. Table 13 illustrates how deferred maintenance costs increase when treatments are delayed. By Year 4, the section’s PCI drops below 9, triggering a 2.0" Overlay with wedge grind, at an approximate cost of $32.5/SY. Because load-related distresses are predominant in this section, its PCI classification will shift from Category I to Category III (load-related) rather than Category II (non-load-related), even though both categories fall within the same PCI range (50–69).

As a result, the deferred maintenance cost for this section alone will increase by more than 5 times between Years 3 and 4, highlighting how delayed action can rapidly accelerate funding needs. In practical terms, a slurry seal may still be a suitable treatment option for pavement sections with PCI values just below the preventive maintenance breakpoint.

Page 844 of 1224 ends

2026 Pavement Management Program Update
Budget Analysis City of Yorba Linda
Final Report May 2026
20 Table 13. Deferred Maintenance Calculation Example.

Year PCI StreetSaver®
Category Treatment Unit Cost (SY)
Inflation
Factor
Total Cost
($)
Inspected 74 I Slurry Seal 5.9 - $23,591
Year 1 72 I Slurry Seal 5.9 1.03 $24,299
Year 2 70 I Slurry Seal 5.9 1.06 $25,028
Year 3 69 I Slurry Seal 5.9 1.09 $25,779
Year 4 67 III 2.0" Overlay
w/wedge grind 41.5 1.13 $146,263
It is also important to note that deferred maintenance projections are only valid when calculated using the same assumed unit costs, inflation rate, and Decision Tree–based treatment recommendations. If any of these inputs are modified in the future, the current projections will no longer reflect accurate deferred maintenance values and must be recalculated accordingly.

8.3 Budget Scenarios
Having determined the maintenance needs of the street network, the next step in developing a cost-effective M&R strategy is to generate several alternative budgets and analyze “what-if” scenarios. The initial approach involved using the City’s existing budget and allocation to evaluate the PCI projection by the end of the analysis period. The analysis of these scenarios reveals distinct outcomes regarding network PCI and deferred maintenance costs, further described:

Primary Scenarios
Scenario 1: City’s Existing Budget ($6.0 million per year +3% increase) – The result shows that at the City’s current funding level, the network PCI is projected to decrease to 72.2 by the end of the analysis period. The cost of deferred maintenance3 will increase from $68.2 million to $103.0 million by the end of FY 33/34.

Scenario 2: Maintain Inspected PCI ($10.5-$11.5 million per year)– In this scenario, additional funds are allocated to increase the network PCI. The results show that the City will need to spend a total of $84.9 million over 8 years to maintain the network PCI at 77.9. Additionally, deferred maintenance will decrease from $68.2 million to $57.6 million by the end of FY 33/34.

Scenario 3: Increase Inspected PCI ($12.5-$13.0 million per year)– Similar to Scenario 2, this scenario allocates additional funds to increase the inspected PCI. The City will need to spend a total of $91.4 million over 8 years to increase the network PCI to 79.1. Deferred maintenance will decrease from $68.2 million to $50.5 million by the end of FY 33/34.
3 Deferred maintenance is a maintenance and activity that was not performed when it should have been or was scheduled to be performed but was delayed to a future period due to the lack of funding.

Page 845 of 1224 ends

2026 Pavement Management Program Update
Budget Analysis City of Yorba Linda
Final Report May 2026
21 Additional Scenarios
Scenario 4: City’s Existing Budget + $1.0M– This scenario allocates an additional $1.0 million per year to the City’s budget. The City will need to spend a total of $60.6 million over 8 years, resulting in a PCI of

73.5. However, network PCI will be above or equal to 75 for the next 2 PMP cycles. Deferred maintenance will increase from $68.2 million to $90.1 million by the end of FY 33/34.

Scenario 5: City’s Existing Budget + $2.0M– This scenario allocates an additional $2.0 million per year to the City’s budget. The City will need to spend a total of $67.6 million over 8 years, resulting in a PCI of

74.9. However, network PCI will be above or equal to 75 through FY 32/33, dropping to 74.9 in the final year. Deferred maintenance will increase from $68.2 million to $84.6 million by the end of FY 33/34.

Scenario 6: City’s Existing Budget with Extended Cycle– This scenario follows the same funding assumptions as Scenario 1, consisting of an initial annual budget of $6.0 million with a 3.0 percent annual increase. However, instead of allocating funding to treat 1 zone per year, the analysis assumes each zone is treated over a two-year period, extending the overall program cycle to 14 years (after Zone7B is completed). The City will need to spend a total of $110.2 million over this period, resulting in a PCI of 68.3 by FY 40/41 (similar trend as of Scenario 1). Deferred maintenance will increase from $68.2 million to $164.4 million by the end of FY 40/41.

The following tables summarize each scenario with its corresponding budget, the PCI, and deferred maintenance costs at the end of the analysis period.

Table 14. Budget Scenario Analysis Summary (Primary Scenarios).

Scenario Description
Cumulative
8-year
Budget ($M)*
FY 33/34
Network PCI Deferred
Maintenance ($M)
1 City’s Existing Budget $53.6 72 $103.0
2 Maintain Inspected PCI $84.9 78 $57.6
3 Increase Inspected PCI $91.4 79 $50.5
Table 15. Budget Scenario Analysis Summary (Additional Scenarios).

Scenario Description
Cumulative
8-Year Budget
($M)*
End of Analysis
Network PCI Deferred
Maintenance ($M)
4 City’s Existing Budget + $1M $60.6 74 $90.1
5 City’s Existing Budget + $2M $67.6 75 $84.6
6 City’s Existing Budget with
Extended Cycle (FY 40/41) $110.2 68 $164.4
Note*: Consistent with prior PMP cycles, the budget scenarios are modeled as a 7-year analysis period. The 8- year span shown reflects the addition of FY 26/27 to capture maintenance work originally scheduled in the current cycle but carried over into the following fiscal year; the underlying 7-year modeling assumption is unchanged. Scenario 6 is the exception and is evaluated over a 14-year extended cycle.

Page 846 of 1224 ends

2026 Pavement Management Program Update
Budget Analysis City of Yorba Linda
Final Report May 2026
22 8.3.1 Scenario 1: City’s Existing Budget ($6.0 million per year +3% increase) This scenario follows current City practice by addressing 1 maintenance zone each year, with an average allocation towards rehabilitation of nearly 64.6 percent. At the City’s current budget of $6.0 million per year with 3.0 percent increase, the network PCI will decrease to 72.2 by the end of FY 33/34. By the end of the analysis period, 31.7 percent of the network area will be in “Very Good” condition, 26.7 percent will be in “Good” condition, 13.3 percent will be in the “ air” condition, 20.3 percent will be in the “Poor” condition, and 8.0 percent will be “Very Poor” condition. The deferred maintenance cost will increase from $68.2 million to $103.0 million by the end of FY 33/34. Table 16 and Figure 8 show the results of this scenario.

Table 16. Summary of Results from Scenario 1 Analysis
FY Inspected 26/27 27/28 28/29 29/30 30/31 31/32 32/33 33/34 Total City’s Annual
Budget ($M) N/A 7.4* 6.0 6.2 6.4 6.6 6.8 7.0 7.2 53.6
Rehabilitation
($M) N/A 4.8 4.2 4.2 5.0 4.4 3.2 4.1 4.7 34.6
Preventive
Maintenance ($M) N/A 2.6 1.8 2.0 1.4 2.2 3.6 2.9 2.5 19.0 Deferred
Maintenance ($M) 68.2 60.7 69.1 75.2 78.4 81.7 88.1 96.6 103.0 N/A Network PCI 78 77 76 75 75 74 73 73 72 N/A
Note*: The City’s annual budget for Y 2 2 was estimated based on the Y 2 2 maintenance program cost of approximately $6.46 million, including an additional 15 percent contingency allowance; Scenarios are modeled on a 7-year cycle. The 8-year span shown includes FY 26/27 to capture carryover work from the current cycle; the 7-year modeling assumption is unchanged.

Figure 8. PCI vs Deferred Maintenance for Scenario 1.

Page 847 of 1224 ends

2026 Pavement Management Program Update
Budget Analysis City of Yorba Linda
Final Report May 2026
23 8.3.2 Scenario 2: Maintain Inspected PCI ($10.5-$11.5 million per year) This scenario aims to maintain the inspected PCI at 78 by the end of FY 33/34. As shown in Table 17 and Figure 9, a total amount of $84.9 million is required over 8 years. Per this scenario, 38.4 percent will be in “Very Good” condition, 33.0 percent will be in “Good” condition 13.0 percent will be in the “ air” condition, 11.5 percent will be in the “Poor” condition, and 4.1 percent will be “Very Poor” condition. The deferred maintenance cost at the end of FY 33/34 will decrease to 57.6 million.

Table 17. Summary of Results from Scenario 2 Analysis
FY Inspection 26/27 27/28 28/29 29/30 30/31 31/32 32/33 33/34 Total City’s Annual
Budget ($M) N/A 7.4* 11.5 11.5 11.5 11.5 10.5 10.5 10.5 84.9 Rehabilitation
($M) N/A 4.8 9.7 9.5 10.1 9.1 5.8 7.6 8.0 64.6
Preventive
Maintenance ($M) N/A 2.6 1.8 2.0 1.4 2.4 4.7 2.9 2.5 20.3 Deferred
Maintenance ($M) 68.2 60.7 63.6 64.1 61.5 59.1 59.9 60.0 57.6 N/A Network PCI 78 77 77 77 77 77 77 78 78 N/A
Note*: The City’s annual budget for Y 2 2 was estimated based on the Y 2 2 maintenance program cost of approximately $6.46 million, including an additional 15 percent contingency allowance; Scenarios are modeled on a 7-year cycle. The 8-year span shown includes FY 26/27 to capture carryover work from the current cycle; the 7-year modeling assumption is unchanged.

Figure 9. PCI vs Deferred Maintenance for Scenario 2.

Page 848 of 1224 ends

2026 Pavement Management Program Update
Budget Analysis City of Yorba Linda
Final Report May 2026
24 8.3.3 Scenario 3: Increase Inspected PCI ($12.5-$13.0 million per year) This scenario targets an increase of the overall network PCI to 79, with an approximate budget allocation of $91.4 million. As shown in Table 18 and Figure 10, the network PCI will increase to 79, while the deferred maintenance at the end of FY 33/34 will decrease to $50.5 million. In this Scenario, 39.7 percent will be in “Very Good” condition, 34.3 percent will be in “Good” condition, 13.7 percent will be in the “ air” condition, 9.0 percent will be in the “Poor” condition, and 3.3 percent will be “Very Poor” condition.

Table 18. Summary of Results from Scenario 3 Analysis
FY Inspection 26/27 27/28 28/29 29/30 30/31 31/32 32/33 33/34 Total City’s Annual
Budget ($M) N/A 7.4* 13.0 12.5 12.5 11.5 11.5 11.5 11.5 91.4 Rehabilitation
($M) N/A 4.8 11.2 10.5 10.3 9.1 6.5 8.6 9.0 70.0
Preventive
Maintenance ($M) N/A 2.6 1.8 2.0 2.2 2.4 5.0 2.9 2.5 21.4 Deferred
Maintenance ($M) 68.2 60.7 63.7 64.2 61.7 56.6 57.0 54.9 50.5 N/A Network PCI 78 77 78 78 78 78 78 79 79 N/A
Note*: The City’s annual budget for Y 2 2 was estimated based on the Y 2 2 maintenance program cost of approximately $6.46 million, including an additional 15 percent contingency allowance; Scenarios are modeled on a 7-year cycle. The 8-year span shown includes FY 26/27 to capture carryover work from the current cycle; the 7-year modeling assumption is unchanged.

Figure 10. PCI vs Deferred Maintenance for Scenario 3.

Page 849 of 1224 ends

2026 Pavement Management Program Update
Budget Analysis City of Yorba Linda
Final Report May 2026
25 8.3.4 Scenario 4: City’s Existing Budget + $1.0M
This additional scenario increases the City’s annual budget by approximately $1. million, with the objective of maintaining compliance with the OCTA PCI threshold of 75 for at least 2 additional PMP cycles, Table 19. It represents an intermediate funding strategy between Scenarios 1 and 2, balancing improved network performance with a more moderate increase in investment. In this scenario, the network PCI will decrease to

73.5, while the deferred maintenance at the end of FY 33/34 will still increase to $90.1 million, Figure 11. By the end of the analysis period, 33.4 percent will be in “Very Good” condition, 27.9 percent will be in “Good” condition, 13.1 percent will be in the “ air” condition, 18.5 percent will be in the “Poor” condition, and 7.1 percent will be “Very Poor” condition.

Table 19. Summary of Results from Scenario 4 Analysis
FY Inspection 26/27 27/28 28/29 29/30 30/31 31/32 32/33 33/34 Total City’s Annual
Budget ($M) N/A 7.4* 7.0 7.2 7.4 7.6 7.8 8.0 8.2 60.6
Rehabilitation
($M) N/A 4.8 5.2 5.2 6.0 5.4 4.2 5.1 5.7 41.6
Preventive
Maintenance ($M) N/A 2.6 1.8 2.0 1.4 2.2 3.6 2.9 2.5 19.0 Deferred
Maintenance ($M) 68.2 60.7 67.6 72.2 73.7 75.1 79.6 86.5 90.1 N/A Network PCI 78 77 76 76 75 74 74 74 74 N/A
Note*: The City’s annual budget for Y 2 2 was estimated based on the Y 2 2 maintenance program cost of approximately $6.46 million, including an additional 15 percent contingency allowance; Scenarios are modeled on a 7-year cycle. The 8-year span shown includes FY 26/27 to capture carryover work from the current cycle; the 7-year modeling assumption is unchanged.

Figure 11. PCI vs Deferred Maintenance for Scenario 4.

Page 850 of 1224 ends

2026 Pavement Management Program Update
Budget Analysis City of Yorba Linda
Final Report May 2026
26 8.3.5 Scenario 5: City’s Existing Budget + $2.0M
This second additional scenario builds upon the approach established in Scenario 4 but is calibrated to maintain compliance with the OCTA PCI threshold of 75 throughout the entire analysis period. Under this scenario, the network PCI is sustained at ~75 over the first 7-years. Achieving this level of performance requires an increase of approximately $2.0 million per year relative to Scenario 1. In this scenario, the network PCI will decrease to 74.9, while the deferred maintenance at the end of FY 33/34 will still increase to $84.6 million, Figure 12. By the end of the analysis period, 35.2 percent will be in “Very Good” condition, 29.2 percent will be in “Good” condition,

12.9 percent will be in the “ air” condition, 17.0 percent will be in the “Poor” condition, and 5.7 percent will be “Very Poor” condition.

Table 20. Summary of Results from Scenario 5 Analysis
FY Inspection 26/27 27/28 28/29 29/30 30/31 31/32 32/33 33/34 Total City’s Annual
Budget ($M) N/A 7.4* 8.0 8.2 8.4 8.6 8.8 9.0 9.2 67.6
Rehabilitation
($M) N/A 4.8 6.2 6.2 7.0 6.4 5.2 6.1 6.7 48.6
Preventive
Maintenance ($M) N/A 2.6 1.8 2.0 1.4 2.2 3.6 2.9 2.5 19.0 Deferred
Maintenance ($M) 68.2 60.7 68.2 72.6 74.4 73.8 77.7 82.5 84.6 N/A Network PCI 78 77 76 76 76 75 75 75 75 N/A
Note*:The City’s annual budget for Y 2 2 was estimated based on the Y 2 2 maintenance program cost of approximately $6.46 million, including an additional 15 percent contingency allowance; Scenarios are modeled on a 7-year cycle. The 8-year span shown includes FY 26/27 to capture carryover work from the current cycle; the 7-year modeling assumption is unchanged.

Figure 12. PCI vs Deferred Maintenance for Scenario 5.

Page 851 of 1224 ends

2026 Pavement Management Program Update
Budget Analysis City of Yorba Linda
Final Report May 2026
27 8.3.6 Scenario 6: City’s Existing Budget with Extended Cycle This additional scenario evaluates the impact of maintaining the City’s existing budget framework while extending the maintenance by distributing funding over a two-year period for each zone. The total projected budget for this scenario is approximately $110.2 million by the end of FY 40/41. Under this scenario, the network PCI is projected to decrease to 68.3, while deferred maintenance is expected to continue increasing to $164.4 million. By the end of the analysis period, approximately 13.5 percent of the network will be in “Very Good” condition, 40.6 percent in “Good” condition, 21.0 percent in “ air” condition, 11.5 percent in “Poor” condition, and 13.4 percent in “Very Poor” condition.

Table 21. Summary of Results from Scenario 6 Analysis
FY Inspection 26/27 27/28
28/29
29/30
30/31
31/32
32/33
33/34
34/35
35/36
36/37
37/38
38/39
39/40
40/41
Total
City’s 2-Year
Budget ($M) N/A 7.4* 12.2 13.0 13.8 14.6 15.4 16.4 17.4 110.2 Rehabilitation
($M) N/A 4.8 10.4 11.4 12.1 12.5 10.1 12.4 15.5 89.2
Preventive
Maintenance ($M) N/A 2.6 1.8 1.6 1.7 2.1 5.3 4.0 1.9 21.0 Deferred
Maintenance ($M) 68.2 60.7 75.2 81.7 96.6 108.4 132.7 147.2 164.4 N/A Network PCI 78 77 75 74 72 70 69 69 68 N/A
Note*:The City’s annual budget for Y 2 2 was estimated based on the Y 2 2 maintenance program cost of approximately $6.46 million, including an additional 15 percent contingency allowance Figure 13. PCI vs Deferred Maintenance for Scenario 6.

Page 852 of 1224 ends

2026 Pavement Management Program Update
Budget Analysis City of Yorba Linda
Final Report May 2026
28 8.4 Scenario Comparisons
Figure 14 and Figure 15 presents the progression of compares the annual PCI trends and deferred maintenance, respectively for all the scenarios till FY 33/34.

Note: Scenarios are modeled on a 7-year cycle. The 8-year span shown includes FY 26/27 to capture carryover work from the current cycle; the 7-year modeling assumption is unchanged.

2 2
1 1

1 2

2 Inspected 2 2 2 2 2 2 2 1 1 2 2
PCI
iscal year
cenario 1
cenario 2
cenario
cenario
cenario
cenario
ntreated PCI o othing

Page 853 of 1224 ends

2026 Pavement Management Program Update
Budget Analysis City of Yorba Linda
Final Report May 2026
29 Figure 14. Comparison of Annual PCI by Scenario.

Figure 15. Comparison of Annual Deferred Maintenance by Scenario.

Note: Scenarios are modeled on a 7-year cycle. The 8-year span shown includes FY 26/27 to capture carryover work from the current cycle; the 7-year modeling assumption is unchanged.

Page 854 of 1224 ends

2026 Pavement Management Program Update
Budget Analysis City of Yorba Linda
Final Report May 2026
30 Figure 16 illustrates the percent change in pavement condition for all the scenarios till the end of FY 33/34, except Scenario 6 where the pavement condition is represented at the end of FY 40/41 when all the zones are assumed to be addressed.

Figure 16. Comparison of Pavement Condition by FY 33/34 Breakdown by Scenarios.

Page 855 of 1224 ends

2026 Pavement Management Program Update
Conclusion and Recommendations City of Yorba Linda
Final Report May 2026
31 9 Conclusion and Recommendations
In summary, the City of Yorba Linda has a substantial investment of $711.7 million in the pavement network.

The City’s Street Network's 2026 weighted average (by area) PCI is 78.4. Overall, 34.6 percent of the City’s Street Network area is in “Very Good” condition, 24.7 percent is in “Good” condition, 30.7 is in “ air” condition, 9.2 percent is in “Poor” condition, and 0.8 percent is in “Very Poor” condition.

The biennial update of the PMP is an eligibility requirement of the Measure M2 plan as administered by OCTA.

Appendix 4 contains the completed PMP template as required by OCTA.

9.1 Findings
Based on the pavement condition, the City has met OCTA’s requirements for receiving a 1 percent reduction in the local matching fund by keeping the overall network PCI greater than 75, with the MPAH street network at PCI of 75.5 and the Local street network showing PCI at 79.7. The City will, therefore, be eligible for the 10 percent reduction in local matching fund requirements for the next 2-year cycle.

However, the City’s existing budget ( cenario 1) of $53.6 million over 8 years is expected to decrease the network PCI to 72.2 by the end of FY 33/34. The City will not be eligible for Measure M2 local matching funds reduction of 10 percent by the end of the analysis period if this Scenario is followed, as the overall PCI will drop below 75. Under Scenario 2, PCI will be maintained at 77.9 by the end of FY 33/34 with an investment of $ 84.9 million (approximately $4.5 million more each year than Scenario 1). Scenario 3 will increase the PCI to 79.1 over 8 years with a total investment of $91.4 million.

In contrast, Scenarios 4 and 5 represent intermediate funding levels, with total investments of $60.6 million and $67.6 million, respectively. These scenarios result in PCI values of 73.5 (Scenario 4) and 74.9 (Scenario 5), both remaining below the long-term PCI target of 75 by FY 33/34.

From a compliance standpoint, Scenario 4 is sufficient to meet Orange County Transportation Authority requirements over the next two PMP cycles. However, only Scenarios 2 and 3 achieve compliance by the end of the analysis period, with both providing a margin above the PCI threshold of 75. Scenario 5 maintains compliance through FY 32/33 but drops to a PCI of 74.9 in the final year.

Scenario 6 evaluates an alternative implementation approach in which the City maintains its existing funding structure but extends the maintenance cycle 7 more years. This scenario requires a total investment of approximately $110.2 million through FY 40/41 and results in a projected network PCI of 68.3 by the end of the analysis period. Although this approach allows broader annual distribution of funding across each zone, the extended treatment cycle accelerates the accumulation of deferred maintenance and results in pavement conditions falling below OCTA compliance thresholds over the long term.

9.2 Recommendations
NCE recommends that the City consider the following:

1. Pavement Budget - NCE recommends that the City adopt Scenario 2 because it effectively maintains the City's PCI while reducing deferred maintenance from $68.2 million to $57.6 million and requires a

Page 856 of 1224 ends

2026 Pavement Management Program Update
Conclusion and Recommendations City of Yorba Linda
Final Report May 2026
32 smaller overall budget increase compared to Scenario 3. It should be noted that this scenario will require the City to increase the funding from $53.6 million to $84.9 million.

2. Additional Funding - To address the gap between the City's existing funding and the recommended scenario, NCE recommends that the City take full advantage of RMRA (SB-1) and actively pursue additional pavement funding sources if feasible. Some of the additional funding sources might include Pavement Trench Cut Fees, Sales Tax Measure, Bond to fund pavement improvements, and others.

3. Pavement Maintenance Strategies
a. NCE recommends that the City continue with a well-funded preventive maintenance program, and with rehabilitation projects to improve pavement currently in poor condition. This is necessary to at least maintain the portion of the street network that is in good condition and avoid increasing the deferred maintenance.

4. Inspection Strategies – To continue monitoring the street network regularly as the City is currently doing which not only meets and exceeds the OCTA standards but ensures to catch changes in PCI so preemptive actions can be taken to address it.

5. Maintenance and Rehabilitation (M&R) Decision Tree - It is crucial to review and update the M&R treatment strategies and associated unit prices annually to reflect new construction techniques/ costs so that the budget analysis results can remain reliable and accurate.

Page 857 of 1224 ends

Appendix 1
Section Description Inventory – Average (Weighted by Area) PCI

Page 858 of 1224 ends

Appendix 1-A
MPAH Network

Page 859 of 1224 ends

City of Yorba Linda
2026 Pavement Management Program Update
Section Description Inventory
MPAH Network
Sorted by Name
Street ID Street Name
Section
ID Beg Location End Location Functional Class
Surface
Type
# Lanes Length
(LF)
Width
(LF) Last Treatment Date Last Treatment PCI Date PCI
AVCDO AVOCADO AVE 01 ORIENTE S/S END A AC 2 2,013 30 10/1/2019 Slurry Seal 11/17/2025 70 AVCDO AVOCADO AVE 02 YORBA LINDA BLVD N/S ORIENTE S/S A AC 2 2,107 23 10/1/2019 Slurry Seal 11/17/2025 75 BSTNCHRY BASTANCHURY RD 01 IMPERIAL HWY W/S OSMOND E/S U AC 3 630 60 7/1/2016 AC Overlay 11/24/2025 56 BSTNCHRY BASTANCHURY RD 02 ROSE DR W/S CITY LIMIT U AC 4 986 60 10/2/2018 Slurry Seal 11/24/2025 64 BSTNCHRY BASTANCHURY RD 03 OSMOND ST E/S PROSPECT AVE E/S U AC 4 1,073 82 7/1/2016 AC Overlay 11/24/2025 58 BSTNCHRY BASTANCHURY RD 04 CASA LOMA E/S VALLEY VIEW AVE E/S A AC 4 1,142 72 6/9/2021 AC Deep Patch 11/24/2025 87 BSTNCHRY BASTANCHURY RD 05 EUREKA S/S CASA LOMA E/S A AC 2 1,320 41 N/A N/A 11/24/2025 96 BSTNCHRY BASTANCHURY RD 06 LAKEVIEW AVE E/S EUREKA E/S A AC 2 2,598 57 10/1/2019 Slurry Seal 11/24/2025 85 BSTNCHRY BASTANCHURY RD 07 HUMBOLDT LANE E/S CLYDESDALE DR W/S A AC 4 2,393 61 10/1/2019 Slurry Seal 11/24/2025 76 BSTNCHRY BASTANCHURY RD 08 CLYDESDALE DR W/S 2571'' W/O FAIRMONT BLVD A AC 4 1,457 61 10/1/2019 Slurry Seal 11/24/2025 76 BSTNCHRY BASTANCHURY RD 09 2571'' W/O FAIRMONT BLVD FAIRMONT BLVD W/S A AC 2 2,571 61 10/1/2019 Slurry Seal 11/24/2025 79 BSTNCHRY BASTANCHURY RD 10 LAKEVIEW AVE E/S HUMBOLDT LN E/S A AC 4 1,705 61 10/1/2019 Slurry Seal 11/24/2025 77 BSTNCHRY BASTANCHURY RD 11 VALLEY VIEW AVE E/S IMPERIAL HWY W/S A AC 4 948 72 10/2/2018 Slurry Seal 11/24/2025 70 BSTNCHRY BASTANCHURY RD 12 PROSPECT AVE W/S ROSE DR E/S U AC/AC 4 1,282 60 10/2/2018 Slurry Seal 11/24/2025 67 CSLOM CASA LOMA AVE 01 BASTANCHURY RD S/S IMPERIAL HWY S/S A AC 2 1,091 33 10/1/2019 Slurry Seal 11/20/2025 61 DIERD DIEMER RD 01 VALLEY VIEW CIR E/S CITY LIMITS A AC 2 327 50 10/2/2018 Slurry Seal 11/3/2025 78 ESPRNZA ESPERANZA RD 01 LINDSEY DR E/S PASEO DEL PRADO E/S U AC/AC 5 1,670 74 10/1/2023 AC Overlay 12/7/2025 98 ESPRNZA ESPERANZA RD 02 BOUNDARY FAIRMONT BLVD W/S U AC 5 1,334 74 7/1/2024 Crack Seal + Slurry Seal 12/7/2025 54 ESPRNZA ESPERANZA RD 03 PASEO DEL PRADO E/S YORBA RANCH RD E/S U AC/AC 5 1,934 75 10/1/2023 AC Overlay 12/7/2025 86 ESPRNZA ESPERANZA RD 04 YORBA RANCH RD E/S VIA DEL CASADOR E/S U AC/AC 5 1,937 75 10/1/2023 AC Overlay 12/7/2025 91 ESPRNZA ESPERANZA RD 05 VIA DEL CASADOR E/S AVENIDA BARCELONA W/S U AC/AC 5 1,413 75 10/1/2023 AC Overlay 12/7/2025 92 ESPRNZA ESPERANZA RD 06 NEW RIVER E/S EAST SIDE CIRCLE E/S U AC/AC 2 600 74 10/1/2023 AC Overlay 12/7/2025 92 ESPRNZA ESPERANZA RD 07 EAST SIDE CIRCLE E/S HIDDEN HILLS ESTATES ENTR U AC/AC 2 880 34 10/1/2023 AC Overlay 12/7/2025 95 ESPRNZA ESPERANZA RD 08 AVENIDA BARCELONA W/S NEW RIVER E/S U AC/AC 5 1,412 75 3/30/2023 AC Overlay 12/7/2025 90 ESPRNZA ESPERANZA RD 09 FAIRMONT BLVD W/S LINDSEY DR E/S U AC 5 1,334 74 7/1/2024 Crack Seal + Slurry Seal 12/7/2025 54 EURKA EUREKA AVENUE 01 MARK LN BASTANCHURY RD A AC 2 763 26 10/1/2019 Slurry Seal 11/20/2025 65 EURKA EUREKA AVENUE 02 IMPERIAL HWY N/S MARK N/S A AC 2 1,277 36 10/1/2019 Slurry Seal 2/9/2026 63 FAIRMNTSB FAIRMONT BLVD S/B 01 PASEO DE LAS PALOMAS GLENHAVEN S/S U AC 2 1,635 24 10/2/2023 Slurry Seal 1/29/2026 87 FAIRMNTSB FAIRMONT BLVD S/B 02 GLENHAVEN S/S NOB HILL DR N/S U AC 2 1,695 32 10/2/2023 Slurry Seal 12/11/2025 82 FAIRMNTSB FAIRMONT BLVD S/B 03 EDUCATION CTR NORTH ENT EDUCATION CTR SO ENTRANCE U AC 2 684 32 10/1/2019 Slurry Seal 11/25/2025 70 FAIRMNTSB FAIRMONT BLVD S/B 04 SO ENTR TO EDUCATION CTR CORDOVA N/S U AC 2 1,814 24 10/1/2019 Slurry Seal 11/25/2025 54 FAIRMNTSB FAIRMONT BLVD S/B 05 CORDOVA N/S LORCA N/S U AC 2 1,137 24 3/23/2023 4" Deep Patch 1/29/2026 39 FAIRMNTSB FAIRMONT BLVD S/B 06 FAIRMONT CONNECTOR NOB HILL U AC 4 1,600 50 1/24/2022 Slurry Seal 12/11/2025 82 FRMNTBLVD FAIRMONT BLVD 01 PASEO DE LAS PALOMAS S/S OAK MEADOW N/S U AC 5 1,182 59 10/2/2023 Slurry Seal 1/29/2026 60 FRMNTBLVD FAIRMONT BLVD 02 OAK MEADOW N/S NOVA S/S U AC 5 2,123 59 10/2/2023 Slurry Seal 1/29/2026 62 FRMNTBLVD FAIRMONT BLVD 03 NOVA S/S YORBA LINDA BLVD S/S U AC 5 823 60 10/2/2023 Slurry Seal 1/29/2026 67 FRMNTBLVD FAIRMONT BLVD 07 YORBA LINDA BLVD N/S LORCA N/S U AC 5 753 60 10/1/2019 Slurry Seal 1/16/2026 41 FRMNTBLVD FAIRMONT BLVD 10 QUARTER HORSE DR N/S FOREST S/S A AC 2 2,125 62 10/1/2019 Slurry Seal 11/25/2025 70 FRMNTBLVD FAIRMONT BLVD 11 YORBA EDUC. CENTER QUARTER HORSE DR N/S A AC 2 1,945 62 10/1/2019 Slurry Seal 11/25/2025 74 FRMNTBVDNB FAIRMONT BLVD N/B 01 FAIRMONT CONNECTOR VILLAGE CENTER S/S U AC 3 1,620 40 1/24/2022 Slurry Seal 1/29/2026 73 FRMNTBVDNB FAIRMONT BLVD N/B 02 VILLAGE CENTER S/S BIG SPRING N/S U AC 2 2,413 32 10/2/2023 Slurry Seal 1/29/2026 69 FRMNTBVDNB FAIRMONT BLVD N/B 03 BIG SPRING N/S PASEO DE LAS PALOMAS S/S U AC 2 1,042 32 10/2/2023 Slurry Seal 1/29/2026 68 FRMNTBVDNB FAIRMONT BLVD N/B 05 LORCA N/S CAMROSA N/S A AC 2 1,525 32 3/23/2023 4" Deep Patch 2/12/2026 72 FRMNTBVDNB FAIRMONT BLVD N/B 06 CAMAROSA N/S YORBA LINDA EC ENTRANCE A AC 2 1,465 32 10/1/2019 Slurry Seal 11/25/2025 65 FRMNTCNNTR FAIRMONT CONNECTOR 01 ESPERANZA RD FAIRMONT BLVD A AC 5 785 84 1/24/2022 Slurry Seal 12/11/2025 79 GYPSMCYN GYPSUM CANYON ROAD 01 SOUTHSIDE OF BRIDGE CENTER OF 91 FWY A AC 5 726 56 7/1/2009 Slurry Seal 12/1/2025 100 HWY90 IMPERIAL HIGHWAY (HWY 90)01 LAKEVIEW AVE 1311'' S/O LAKEVIEW AVE U AC 4 1,311 79 7/1/2016 Slurry Seal 12/8/2025 72 HWY90 IMPERIAL HIGHWAY (HWY 90)02 BUENA VISTA AVE 1468'' S/O BUENA VISTA AVE U AC 4 1,468 79 7/1/2016 Slurry Seal 12/8/2025 74 A - Arterials, U - Urban Principal Arterials
AC - Asphalt Concrete, AC/AC - Asphalt Concrete Overlay of existing Asphalt Concrete Page 860 of 1224 1 of 4 4/29/2026 City of Yorba Linda
2026 Pavement Management Program Update
Section Description Inventory
MPAH Network
Sorted by Name
Street ID Street Name
Section
ID Beg Location End Location Functional Class
Surface
Type
# Lanes Length
(LF)
Width
(LF) Last Treatment Date Last Treatment PCI Date PCI
HWY90 IMPERIAL HIGHWAY (HWY 90)03 KELLOGG DR 1519'' S/O KELLOG DR U AC 4 1,519 72 7/1/2016 Slurry Seal 12/8/2025 69 HWY90 IMPERIAL HIGHWAY (HWY 90)04 CITY LIMITS PROSPECT AVE U AC 6 912 102 7/1/2015 Slurry Seal 11/10/2025 54 HWY90 IMPERIAL HIGHWAY (HWY 90)05 PROSPECT AVE 1068'' S/O PROSPECT AVE U AC 6 1,068 101 7/1/2015 Slurry Seal 11/10/2025 51 HWY90 IMPERIAL HIGHWAY (HWY 90)06 BASTANCHURY RD VALLEY VIEW AVE U AC 6 945 105 7/1/2015 Slurry Seal 11/10/2025 62 HWY90 IMPERIAL HIGHWAY (HWY 90)07 VALLEY VIEW AVE 758'' S/O VALLEY VIEW U AC 6 758 106 7/1/2015 Slurry Seal 11/10/2025 47 HWY90 IMPERIAL HIGHWAY (HWY 90)08 CASA LOMA AVE EUREKA DRIVE U AC 6 1,490 98 7/1/2015 Slurry Seal 11/10/2025 66 HWY90 IMPERIAL HIGHWAY (HWY 90)09 LEMON DR YORBA LINDA BLVD U AC 6 1,733 92 7/1/2015 Slurry Seal 11/10/2025 49 HWY90 IMPERIAL HIGHWAY (HWY 90)10 EUREKA DRIVE LEMON DRIVE U AC 6 1,046 98 7/1/2015 Slurry Seal 11/10/2025 51 HWY90 IMPERIAL HIGHWAY (HWY 90)11 1468'' S/O BUENA VISTA AVE KELLOGG DR U AC 4 1,468 79 7/1/2016 Slurry Seal 12/8/2025 73 HWY90 IMPERIAL HIGHWAY (HWY 90)12 1519'' S/O KELLOG DR CITY LIMITS U AC 4 1,519 72 1/24/2022 Slurry Seal 2/3/2026 68 HWY90 IMPERIAL HIGHWAY (HWY 90)13 1068'' S/O PROSPECT AVE BASTANCHURY RD U AC 6 1,068 101 7/1/2015 Slurry Seal 11/10/2025 65 HWY90 IMPERIAL HIGHWAY (HWY 90)14 YORBA LINDA BLVD LAKEVIEW AVE U AC 6 570 92 7/1/2016 Slurry Seal 12/8/2025 63 HWY90 IMPERIAL HIGHWAY (HWY 90)15 1311'' S/O LAKEVIEW AVE BUENA VISTA AVE U AC 4 1,310 79 7/1/2016 Slurry Seal 12/8/2025 76 HWY90 IMPERIAL HIGHWAY (HWY 90)16 758'' S/O VALLEY VIEW CASA LOMA AVE U AC 6 758 106 7/1/2015 Slurry Seal 11/10/2025 42 HWY90 IMPERIAL HIGHWAY (HWY 90)RAMP D WESTBOUND OFF-RAMP (On to Kellogg) U AC 1 978 26 1/24/2022 Slurry Seal 12/8/2025 79 HWY90 IMPERIAL HIGHWAY (HWY 90)RAMP E EASTBOUND ON-RAMP (From Kellogg) U AC 1 997 26 N/A N/A 2/11/2026 70 HWY90 IMPERIAL HIGHWAY (HWY 90)RAMP F EASTBOUND OFF RAMP (On to Kellogg) U AC 1 928 26 N/A N/A 12/8/2025 67 HWY90 IMPERIAL HIGHWAY (HWY 90)RAMP G WESTBOUND ON-RAMP (From Kellogg) U AC 1 922 26 N/A N/A 12/8/2025 65 KLLG KELLOGG DR 01 YORBA LINDA BLVD S/S SHADOW HILL N/S (City Limit) A AC/AC 3 1,260 50 1/20/2022 AC Overlay 2/11/2026 71 KLLG KELLOGG DR 02 CITY LIMITS MOUNTAIN VIEW S/S A AC/AC 3 555 50 1/20/2022 AC Overlay 12/10/2025 87 KLLG KELLOGG DR 03 MOUNTAIN VIEW S/S GRANDVIEW AVE A AC/AC 2 2,217 50 1/20/2022 AC Overlay 12/10/2025 88 KLLG KELLOGG DR 04 GRANDVIEW AVE N/S IMPERIAL HWY N/S A AC/AC 4 262 50 1/20/2022 AC Overlay 12/10/2025 87 LAPLMA LA PALMA AVE 01 CITY BOUNDARY 1000'' FROM BOUNDARY A AC 5 1,000 86 7/1/2024 Localized Inlay + BR 12/1/2025 100 LAPLMA LA PALMA AVE 02 2000'' FROM BOUNDARY 3661'' FROM BOUNDARY A AC 5 1,661 86 7/1/2024 Localized Inlay + BR 12/1/2025 100 LAPLMA LA PALMA AVE 03 GYPSUM CYN W/S CAMINO DE BRYANT TO SANCT A AC 5 1,612 64 7/1/2024 Localized Inlay + BR 12/1/2025 99 LAPLMA LA PALMA AVE 04 1000'' FROM BOUNDARY 2000'' FROM BOUNDARY A AC 5 1,000 86 7/1/2024 Localized Inlay + BR 12/1/2025 100 LAPLMAEB LA PALMA AVE E/B 01 VIA LOMAS DE YORBA W E/S 1235'' S/O VIA LOMAS DE YORBA A AC 5 1,235 86 7/1/2024 Localized Inlay + BR 12/1/2025 100 LAPLMAEB LA PALMA AVE E/B 02 YLBP ENTRANCE E/B 928'' S/O YLBP ENTRANCE A AC 5 928 86 7/1/2024 Localized Inlay + BR 12/1/2025 100 LAPLMAEB LA PALMA AVE E/B 03 OLD VILLAGE WEST E/S VIA LOMAS DE YORBA W/S A AC 5 1,675 86 7/1/2024 Localized Inlay + BR 12/1/2025 99 LAPLMAEB LA PALMA AVE E/B 04 VIA LOMAS DE YORBA W/S CORBIT PLACE W/S A AC 5 1,294 86 7/1/2024 Localized Inlay + BR 12/1/2025 100 LAPLMAEB LA PALMA AVE E/B 05 CORBIT PLACE W/S GYPSUM CYN W/S A AC 5 1,446 86 7/1/2024 Localized Inlay + BR 12/1/2025 99 LAPLMAEB LA PALMA AVE E/B 06 1235'' S/O VIA LOMAS DE YORBAYL BP ENTRANCE W/S A AC 5 450 86 7/1/2024 Localized Inlay + BR 12/1/2025 100 LAPLMAEB LA PALMA AVE E/B 07 928'' S/O YLBP ENTRANCE OLD VILLAGE E/S A AC 5 928 86 7/1/2024 Localized Inlay + BR 12/1/2025 99 LKEVW LAKEVIEW AVE 01 MARIPOSA S/S PEPPERGROVE S/S U AC 4 1,491 50 5/28/2021 Slurry Seal 2/3/2026 66 LKEVW LAKEVIEW AVE 02 PEPPERGROVE S/S 120'' N/O BUENA VISTA U AC 5 1,689 60 10/1/2013 Slurry Seal 12/18/2025 72 LKEVW LAKEVIEW AVE 03 120'' N/O BUENA VISTA 120'' S/O FLORA DR U AC/AC 2 1,233 48 5/28/2021 Slurry Seal 12/18/2025 95 LKEVW LAKEVIEW AVE 04 120'' S/O FLORA DR S/S IMPERIAL HWY BRIDGE U AC/AC 5 1,161 60 3/27/2021 AC Overlay 12/18/2025 93 LKEVW LAKEVIEW AVE 05 N/S IMPERIAL HWY BRIDGE YORBA LINDA S/S U AC/AC 5 508 80 3/27/2021 AC Overlay 12/18/2025 87 LKEVW LAKEVIEW AVE 06 YORBA LINDA N/S LEMON DR A AC 4 1,029 60 10/1/2019 Slurry Seal 11/20/2025 70 LKEVW LAKEVIEW AVE 07 LEMON DR ORIENTE S/S A AC 2 895 60 10/1/2019 Slurry Seal 11/20/2025 70 LKEVW LAKEVIEW AVE 08 ORIENTE S/S 600FT S/O S H A AC 2 630 60 10/1/2019 Slurry Seal 11/20/2025 50 LKEVW LAKEVIEW AVE 09 120'' N/O SOUTHERN HILLS BASTANCHURY S/S A AC 2 635 34 10/1/2019 Slurry Seal 11/20/2025 72 LKEVW LAKEVIEW AVE 10 VALLEY VIEW DUMMURRY LN A AC 4 2,421 50 10/2/2018 Slurry Seal 11/20/2025 65 LKEVW LAKEVIEW AVE 11NB 120 N OF SH 600FT S/O S H A AC 2 720 30 7/1/2004 AC Overlay 2/9/2026 57 LKEVW LAKEVIEW AVE 11SB 120 N OF SH 600FT S/O SH SB A AC 2 720 30 7/1/2004 AC Overlay 11/20/2025 58 LKEVW LAKEVIEW AVE 12 DUMMURRY LN HOGAN DR A AC 4 2,254 50 10/2/2018 Slurry Seal 11/20/2025 66 LKEVW LAKEVIEW AVE 13 HOGAN DR BASTANCHURY RD A AC 4 2,078 50 10/2/2018 Slurry Seal 11/20/2025 65 LMNDR LEMON DRIVE 01 IMPERIAL HWY W/S EUREKA AVE A AC 2 674 26 10/1/2019 Slurry Seal 2/9/2026 76 A - Arterials, U - Urban Principal Arterials
AC - Asphalt Concrete, AC/AC - Asphalt Concrete Overlay of existing Asphalt Concrete Page 861 of 1224 2 of 4 4/29/2026 City of Yorba Linda
2026 Pavement Management Program Update
Section Description Inventory
MPAH Network
Sorted by Name
Street ID Street Name
Section
ID Beg Location End Location Functional Class
Surface
Type
# Lanes Length
(LF)
Width
(LF) Last Treatment Date Last Treatment PCI Date PCI
LMNDR LEMON DRIVE 02 LAKEVIEW W/S MAIN ST A AC 2 763 38 6/9/2021 AC Deep Patch 11/11/2025 94 LMNDR LEMON DRIVE 03 MAIN ST IMPERIAL E/S A AC 2 755 38 10/1/2019 Slurry Seal 11/11/2025 79 MNSTRT MAIN ST 01 IMPERIAL HWY LEMON DR A AC 2 665 24 11/1/2019 Complete Reconstruction - AC 11/11/2025 95 NWRVRDEB NEW RIVER RD E/B 01 YORBA LINDA BLVD ESPERANZA RD A AC 2 1,270 22 10/2/2023 Slurry Seal 12/18/2025 72 NWRVRDWB NEW RIVER RD W/B 01 ESPERANZA RD YORBA LINDA BLVD A AC 2 1,270 22 10/2/2023 Slurry Seal 12/18/2025 75 OHIOST OHIO ST 06 YORBA LINDA BLVD ORIENTE S/S A AC 2 1,920 27 10/1/2019 Slurry Seal 11/18/2025 75 OHIOST OHIO ST 07 ORIENTE S/S END A AC 2 1,320 24 10/1/2019 Slurry Seal 11/18/2025 65 PLMAVE PALM AVE 01 ORIENTE N/S END A AC 2 1,003 24 10/1/2019 Slurry Seal 11/18/2025 70 PLMAVE PALM AVE 02 YORBA LINDA N/S ORIENTE S/S A AC 2 1,938 30 10/1/2019 Slurry Seal 11/18/2025 67 PSDLPLMSEB PASEO DE LAS PALOMAS E/B01 FAIRMONT BLVD N/S VIA DEL MAR N/S A AC 2 1,464 29 1/24/2022 Slurry Seal 1/29/2026 65 PSDLPLMSEB PASEO DE LAS PALOMAS E/B02 VIA DEL MAR N/S VILLAGE CENTER W/S A AC 2 1,157 29 1/24/2022 Slurry Seal 1/29/2026 64 PSDLPLMSEB PASEO DE LAS PALOMAS E/B03 VILLAGE CENTER W/S PASEO DEL PARDO E/S A AC 2 1,936 29 3/31/2023 Slurry Seal 12/16/2025 89 PSDLPLMSEB PASEO DE LAS PALOMAS E/B04 PASEO DEL PARDO E/S YORBA LINDA BLVD W/S A AC 2 2,927 25 3/31/2023 Slurry Seal 12/16/2025 93 PSDLPLMSWB PASEO DE LAS PALOMAS W/B01 YORBA LINDA BLVD S/S INGRESO S/S A AC 2 1,953 25 3/31/2023 Slurry Seal 12/16/2025 78 PSDLPLMSWB PASEO DE LAS PALOMAS W/B02 INGRESO S/S VIA AZAFRAN S/S A AC 2 1,949 29 3/31/2023 Slurry Seal 12/16/2025 92 PSDLPLMSWB PASEO DE LAS PALOMAS W/B03 VIA AZAFRAN S/S VILLAGE CENTER N/S A AC 2 921 29 3/31/2023 Slurry Seal 12/16/2025 95 PSDLPLMSWB PASEO DE LAS PALOMAS W/B04 VILLAGE CENTER S/S VISTA LAGUNA S/S A AC 2 1,275 29 1/24/2022 Slurry Seal 1/29/2026 55 PSDLPLMSWB PASEO DE LAS PALOMAS W/B05 VISTA LAGUNA S/S FAIRMONT BLVD S/S A AC 2 1,464 29 1/24/2022 Slurry Seal 1/29/2026 61 RCHFLD RICHFIELD RD 01 WILLOW CIRCLE ORCHARD DR A AC 3 1,165 60 10/1/2013 Slurry Seal 12/10/2025 81 RCHFLD RICHFIELD RD 02 BUENA VISTA AVE WILLOW CIRCLE A AC 5 2,326 60 5/28/2021 Slurry Seal 12/10/2025 68 RCHFLD RICHFIELD RD 03 ROCK ROSE N/S BUENA VISTA S/S A AC 3 1,080 60 10/1/2013 Slurry Seal 12/10/2025 70 RCHFLD RICHFIELD RD 04 YORBA LINDA S/S ROCK ROSE N/S A AC 4 1,881 60 5/28/2021 Slurry Seal 12/10/2025 67 RSEDR ROSE DR 01 PROMENADE AVE NORTH CITY LIMIT U AC 2 660 22 10/2/2018 Slurry Seal 10/30/2025 70 RSEDR ROSE DR 02 WABASH AVE S/S PROMENADE AVE N/S U AC 4 695 60 10/2/2018 Slurry Seal 1/16/2026 51 RSEDR ROSE DR 03 600'' S/o WABASH (City Limit) WABASH AVE U AC 5 612 80 10/2/2018 Slurry Seal 1/16/2026 54 RSEDR ROSE DR 04 BASTANCHURY RD 200'' S/o IMPERIAL HWY (City Li U AC 5 1,750 80 10/2/2018 Slurry Seal 1/16/2026 51 RSEDR ROSE DR 05 VERNA LN BASTANCHURY RD U AC 5 1,465 80 10/2/2018 Slurry Seal 10/30/2025 71 RSEDR ROSE DR 06 YORBA LINDA BLVD OAKHURST CIR N/S U AC 5 1,198 80 10/2/2018 Slurry Seal 10/30/2025 66 RSEDR ROSE DR 07 OAKHURST CIR N/S VERNA LN S/S U AC 5 1,198 80 10/2/2018 Slurry Seal 10/30/2025 63 VLLGCTRNB VILLAGE CENTER DR N/B 01 YORBA LINDA BLVD N/S VIA ESPANA N/S A AC 2 1,770 29 10/2/2023 Slurry Seal 12/2/2025 90 VLLGCTRNB VILLAGE CENTER DR N/B 02 VIA ESPANA N/S MANZANITA S/S A AC 2 1,437 24 10/2/2023 Slurry Seal 12/2/2025 99 VLLGCTRNB VILLAGE CENTER DR N/B 03 MANZANITA S/S FAIRMONT S/S A AC 2 2,053 23 10/2/2023 Slurry Seal 12/2/2025 98 VLLGCTRNB VILLAGE CENTER DR N/B 04 FAIRMONT BLVD N/S VIA SANTA MARIA A AC 2 1,384 29 3/31/2023 Slurry Seal 12/16/2025 61 VLLGCTRNB VILLAGE CENTER DR N/B 05 VIA SANTA MARIA N/S VIA ALCANTARA N/S A AC 2 2,225 29 3/31/2023 Slurry Seal 1/29/2026 74 VLLGCTRNB VILLAGE CENTER DR N/B 06 VIA ALACANTARA PASEO DE LAS PALOMAS S/S A AC 2 1,514 29 3/31/2023 Slurry Seal 12/16/2025 68 VLLGCTRNB VILLAGE CENTER DR N/B 07 PASEO DE LAS PALOMAS S/S VIA MARWAH A AC 2 1,641 29 3/31/2023 Slurry Seal 12/16/2025 56 VLLGCTRNB VILLAGE CENTER DR N/B 08 VIA MARWAH N/S YORBA LINDA N/S A AC 2 1,864 29 3/31/2023 Slurry Seal 12/16/2025 58 VLLGCTRSB VILLAGE CENTER DR S/B 01 YORBA LINDA BLVD N/S VISTA LAGUNA S/S A AC 2 1,956 29 3/31/2023 Slurry Seal 12/16/2025 59 VLLGCTRSB VILLAGE CENTER DR S/B 02 VISTA LAGUNA S/S PASEO DE LAS PALOMAS S/S A AC 2 1,586 29 3/31/2023 Slurry Seal 1/29/2026 58 VLLGCTRSB VILLAGE CENTER DR S/B 03 PASEO DE LAS PALOMAS S/S VIA SANTA MARIA N/S A AC 2 3,634 29 3/31/2023 Slurry Seal 1/29/2026 61 VLLGCTRSB VILLAGE CENTER DR S/B 04 VIA SANTA MARIA N/S FAIRMONT BLVD A AC 2 1,400 29 3/31/2023 Slurry Seal 12/16/2025 73 VLLGCTRSB VILLAGE CENTER DR S/B 05 FAIRMONT BLVD S/B MANZANITA S/S A AC 2 2,053 23 10/2/2023 Slurry Seal 12/2/2025 100 VLLGCTRSB VILLAGE CENTER DR S/B 06 MANZANITA S/S ESPANA S/S A AC 2 1,437 24 10/2/2023 Slurry Seal 12/2/2025 99 VLLGCTRSB VILLAGE CENTER DR S/B 07 ESPANA N/S YORBA LINDA BLVD A AC 2 1,770 29 10/2/2023 Slurry Seal 12/2/2025 81 VLLYVW VALLEY VIEW AVE 01 ORANGE DR N/S YORBA LINDA N/S A AC 3 1,294 60 10/2/2018 Slurry Seal 11/25/2025 71 VLLYVW VALLEY VIEW AVE 02 IMPERIAL HWY S/S ORANGE N/S A AC 3 2,115 60 10/2/2018 Slurry Seal 11/25/2025 72 VLLYVW VALLEY VIEW AVE 03 BASTANCHURY S/S IMPERIAL N/S A AC 3 370 60 7/1/2010 Slurry Seal 11/25/2025 86 VLLYVW VALLEY VIEW AVE 04 LAKEVIEW AVE S/S VALLEY VIEW CIR N/S A AC 4 811 50 10/2/2018 Slurry Seal 2/6/2026 66 A - Arterials, U - Urban Principal Arterials
AC - Asphalt Concrete, AC/AC - Asphalt Concrete Overlay of existing Asphalt Concrete Page 862 of 1224 3 of 4 4/29/2026 City of Yorba Linda
2026 Pavement Management Program Update
Section Description Inventory
MPAH Network
Sorted by Name
Street ID Street Name
Section
ID Beg Location End Location Functional Class
Surface
Type
# Lanes Length
(LF)
Width
(LF) Last Treatment Date Last Treatment PCI Date PCI
VLLYVW VALLEY VIEW AVE 05 VALLEY VIEW CIR N/S DIEMER RD S/S A AC 2 1,227 45 10/2/2018 Slurry Seal 2/6/2026 72 VLLYVW VALLEY VIEW AVE 06 DIEMER RD S/S RED PINE RD N/S A AC 2 1,931 30 10/2/2018 Slurry Seal 2/6/2026 78 VLLYVW VALLEY VIEW AVE 07 RED PINE RD N/S CAMINO CABRILLO N/S A AC 2 1,906 30 10/2/2018 Slurry Seal 11/4/2025 88 VLLYVW VALLEY VIEW AVE 08 CAMINO CABRILLO N/S VALLEY VIEW AVE W/S A AC 2 2,324 30 10/2/2018 Slurry Seal 11/4/2025 86 VLLYVWNB VALLEY VIEW AVE N/B 01 BASTANCHURY RD S/S MARDA AVE S/S A AC 2 935 26 10/2/2018 Slurry Seal 11/4/2025 84 VLLYVWNB VALLEY VIEW AVE N/B 02 MARDA AVE S/S LAKEVIEW AVE S/S A AC 2 1,160 26 10/2/2018 Slurry Seal 2/6/2026 71 VLLYVWSB VALLEY VIEW AVE S/B 01 MARDA AVE S/S BASTANCHURY RD S/S A AC 2 935 26 10/2/2018 Slurry Seal 11/4/2025 84 VLLYVWSB VALLEY VIEW AVE S/B 02 LAKEVIEW AVE S/S MARDA AVE S/S A AC 2 1,160 26 10/2/2018 Slurry Seal 11/4/2025 84 WIERCYN WEIR CANYON RD 01 CENTERLINE 91 FWY CITY LIMIT @ BRIDGE U AC 3 1,610 39 7/1/2016 Slurry Seal 12/1/2025 60 YRBARNCHNB YORBA RANCH N/B 01 ESPERANZA ROAD S/S TRAIL SIDE S/S A AC 2 2,292 25 10/2/2023 Slurry Seal 12/18/2025 96 YRBARNCHNB YORBA RANCH N/B 02 TRAIL SIDE S/S CARLOS RD S/S A AC 2 2,212 25 10/2/2023 Slurry Seal 12/18/2025 98 YRBARNCHNB YORBA RANCH N/B 03 CARLOS RD S/S YORBA LINDA BLVD S/S A AC 2 1,760 25 10/2/2023 Slurry Seal 12/18/2025 86 YRBARNCHSB YORBA RANCH S/B 01 YORBA LINDA BLVD S/B VIA RAMON S/S A AC/AC 2 2,357 25 10/2/2023 Slurry Seal 12/18/2025 92 YRBARNCHSB YORBA RANCH S/B 02 VIA RAMON S/S PASEO DE LAS CUMBRE S/S A AC 2 1,982 25 10/2/2023 Slurry Seal 1/30/2026 91 YRBARNCHSB YORBA RANCH S/B 03 PASEO DE LAS CUMBRE S/S ESPERANZA RD S/S A AC/AC 2 1,950 25 10/2/2023 Slurry Seal 12/18/2025 97 YRBLNDBLVD YORBA LINDA BLVD 01 EB AVENIDA ADOBE N/S BRIDGE AT ESPERANZA A AC/AC 2 1,900 32 7/1/2024 AC Overlay 12/7/2025 82 YRBLNDBLVD YORBA LINDA BLVD 01 WB BRIDGE AT ESPERANZA AVENIDA ADOBE N/S A AC/AC 2 1,900 32 7/1/2024 AC Overlay 12/7/2025 57 YRBLNDBLVD YORBA LINDA BLVD 02 EB VIA DEL ESCUELA W/S AVENIDA ADOBE W/S A AC/AC 2 2,410 32 7/1/2024 AC Overlay 12/7/2025 68 YRBLNDBLVD YORBA LINDA BLVD 02 WB AVENIDA ADOBE N/S VIA DEL ESCUELA N/S A AC/AC 2 2,410 32 7/1/2024 AC Overlay 12/7/2025 75 YRBLNDBLVD YORBA LINDA BLVD 03 EB YORBA RANCH W/S VIA DEL ESCUELA W/S A AC/AC 2 1,872 32 7/1/2024 AC Overlay 12/7/2025 74 YRBLNDBLVD YORBA LINDA BLVD 03 WB VIA DEL ESCUELA N/S YORBA RANCH N/S A AC/AC 2 1,872 32 7/1/2024 AC Overlay 12/7/2025 75 YRBLNDBLVD YORBA LINDA BLVD 04 EB PASEO DE LAS PALOMAS E/S YORBA RANCH W/S A AC 2 1,490 32 10/2/2023 Slurry Seal 12/7/2025 94 YRBLNDBLVD YORBA LINDA BLVD 04 WB YORBA RANCH N/S PASEO DE LAS PALOMAS S/S A AC 2 1,490 32 10/2/2023 Slurry Seal 2/2/2026 86 YRBLNDBLVD YORBA LINDA BLVD 05 EB VILLAGE CENTER DR E/S PASEO DE LAS PALOMAS E/S A AC 2 2,582 32 10/2/2023 Slurry Seal 12/7/2025 88 YRBLNDBLVD YORBA LINDA BLVD 05 WB PASEO DE LAS PALOMAS W/S VILLAGE CENTER DR W/S A AC 2 2,582 32 10/2/2023 Slurry Seal 12/7/2025 92 YRBLNDBLVD YORBA LINDA BLVD 06 EB AVENIDA RIO DEL ORO VILLAGE CENTER A AC 2 2,185 32 1/24/2022 Slurry Seal 1/8/2026 82 YRBLNDBLVD YORBA LINDA BLVD 06 WB VILLAGE CENTER DR W/S AVENIDA RIO DEL ORO E/S A AC 2 2,229 32 1/24/2022 Slurry Seal 1/8/2026 87 YRBLNDBLVD YORBA LINDA BLVD 07 EB KELLOGG DR E/S AVENIDA RIO DEL ORO E/S A AC/AC 3 3,565 40 1/20/2022 AC Overlay 1/8/2026 80 YRBLNDBLVD YORBA LINDA BLVD 07 WB AVENIDA RIO DEL ORO E/S KELLOGG DR E/S A AC/AC 3 3,530 40 1/20/2022 AC Overlay 1/8/2026 83 YRBLNDBLVD YORBA LINDA BLVD 08 EB OHIO ST E/S KELLOGG DR W/S A AC/AC 3 2,100 32 1/20/2022 AC Overlay 1/8/2026 81 YRBLNDBLVD YORBA LINDA BLVD 08 WB KELLOGG DR E/S OHIO ST E/S A AC/AC 3 2,045 40 1/20/2022 AC Overlay 1/8/2026 83 YRBLNDBLVD YORBA LINDA BLVD 09 EB AVOCADO AVE W/S OHIO ST E/S A AC 3 1,670 32 10/1/2019 Slurry Seal 2/3/2026 100 YRBLNDBLVD YORBA LINDA BLVD 09 WB OHIO ST E/S AVOCADO AVE W/S A AC 3 1,700 32 10/1/2019 Slurry Seal 2/3/2026 100 YRBLNDBLVD YORBA LINDA BLVD 10 EB LAKEVIEW AVE W/S AVOCADO AVE W/S A AC 3 1,329 32 10/1/2019 Slurry Seal 1/8/2026 50 YRBLNDBLVD YORBA LINDA BLVD 10 WB AVOCADO AVE W/S LAKEVIEW W/S A AC 3 1,329 32 10/1/2019 Slurry Seal 1/8/2026 74 YRBLNDBLVD YORBA LINDA BLVD 11 LAKEVIEW AVE W/S IMPERIAL HWY E/S A AC 8 477 80 5/28/2021 Slurry Seal 1/8/2026 31 YRBLNDBLVD YORBA LINDA BLVD 12 EB EUREKA AVE E/S IMPERIAL HWY W/S A AC 2 2,041 32 5/28/2021 Slurry Seal 12/16/2025 61 YRBLNDBLVD YORBA LINDA BLVD 12 WB IMPERIAL HWY W/S EUREKA AVE E/S A AC 2 1,893 32 5/28/2021 Slurry Seal 12/16/2025 60 YRBLNDBLVD YORBA LINDA BLVD 13 EB CASA LOMA AVE W/S EUREKA AVE W/S A AC 2 1,283 32 5/28/2021 Slurry Seal 12/16/2025 72 YRBLNDBLVD YORBA LINDA BLVD 13 WB EUREKA AVE E/S CASA LOMA AVE E/S A AC 2 1,280 32 5/28/2021 Slurry Seal 12/16/2025 70 YRBLNDBLVD YORBA LINDA BLVD 14 CASA LOMA AVE W/S VALLEY VIEW AVE E/S A AC 5 1,263 80 5/28/2021 Slurry Seal 12/16/2025 67 YRBLNDBLVD YORBA LINDA BLVD 15 VAN BUREN E/S TORIDA WAY W/S A AC 4 978 80 5/28/2021 Slurry Seal 12/16/2025 80 YRBLNDBLVD YORBA LINDA BLVD 16 ROSE DR W/S (City Limit) LINDA VISTA (City Limit) A AC 5 726 64 10/2/2018 ARHM Overlay 10/30/2025 78 YRBLNDBLVD YORBA LINDA BLVD 17 VALLEY VIEW AVE E/S VAN BUREN E/S A AC 5 880 80 5/28/2021 Slurry Seal 12/16/2025 73 YRBLNDBLVD YORBA LINDA BLVD 18 TORIDA WAY W/S PROSPECT AVE E/S (CITY LIMITS) A AC 4 978 80 5/28/2021 Slurry Seal 12/16/2025 61 A - Arterials, U - Urban Principal Arterials
AC - Asphalt Concrete, AC/AC - Asphalt Concrete Overlay of existing Asphalt Concrete Page 863 of 1224 4 of 4 4/29/2026 Appendix 1-B
Local Network

Page 864 of 1224 ends

City of Yorba Linda
2026 Pavement Management Program Update
Section Description Inventory
Local Network
Sorted by Name
Street ID Street Name
Section
ID Beg Location End Location Functional Class
Surface
Type
# Lanes Length
(LF)
Width
(LF) Last Treatment Date Last Treatment PCI Date PCI
ABBLN ABBEY LN 01 LIVERPOOL ST END CDS R AC 2 182 33 10/2/2018 Slurry Seal 11/7/2025 73 ABBYGLN ABBY GLEN DR 01 CAMINO DE BRYANT END CDS R AC 2 876 28 7/1/2025 Crack Seal + Slurry Seal + MM + LI + BR 10/19/2023 86 ACACHLL ACACIA HILL DR 01 END CDS COUNTRY VIEW R AC 2 1,072 29 1/24/2022 Slurry Seal 12/17/2025 73 ACACHLL ACACIA HILL DR 02 COUNTRY VIEW COUNTRY VIEW R AC 2 1,131 33 1/24/2022 Slurry Seal 12/17/2025 73 ACRCT ACORN CT 01 S END N END R AC/AC 2 526 33 7/1/2019 AC Overlay 11/11/2025 91 ADAMSCIRC ADAMS CIRCLE 01 JUSTIN WAY END CDS R AC 2 200 33 3/31/2023 Slurry Seal 12/5/2025 81 ALAMDA VIA ALAMEDA 01 AVENIDA PUESTA DEL SOL END OF CDS R AC 2 738 33 10/1/2019 Slurry Seal 11/12/2025 74 ALDR ALDER AVE 01 SAN ANTONIO RD END CDS R AC/AC 2 957 37 10/1/2023 AC Overlay 12/2/2025 92 ALFCI ALFORD CIRCLE 01 LANDMARK AVE N END CDS R AC 2 119 33 10/2/2018 Slurry Seal 10/30/2025 70 ALFCI ALFORD CIRCLE 02 LANDMARK AVE S END CDS R AC 2 100 33 10/2/2018 Slurry Seal 10/30/2025 70 ALLNBY ALLONBY CIRCLE 01 STONEHAVEN DR END CDS R AC 2 355 33 7/1/2024 Crack Seal + Slurry Seal 12/3/2025 82 ALPNLNE ALPINE LANE 01 KODIAK MTN END CDS R AC 2 239 28 7/1/2025 Crack Seal + Slurry Seal + MM + LI + BR 10/19/2023 87 ALVTA ALEUTIA WAY 01 ELK MOUNTAIN DR END CDS R AC/AC 2 1,024 28 7/1/2025 AC Overlay 10/10/2023 100 AMBRDLE AMBERDALE DR 01 FAIRMONT BL CANYON DR R AC 2 2,929 37 1/24/2022 Slurry Seal 12/12/2025 75 ANDRA ANDREA CIR 01 VIA MARWAH END CDS R AC 2 172 27 3/31/2023 Slurry Seal 12/5/2025 78 ANNACIR ANNA CIRCLE 01 SOUTHVIEW END CDS R AC 2 151 27 3/31/2023 Slurry Seal 12/15/2025 84 APLORCDR APPLE ORCHARD DR 01 VALLEY VIEW AVE PONDEROSA WY R AC 2 458 37 10/2/2018 Slurry Seal 11/5/2025 76 APPLCRSSLN APPLECROSS LANE 01 CAMINO DE BRYANT END CDS R AC/AC 2 132 28 7/1/2025 AC Overlay 10/19/2023 100 ARBGATLN ARBOR GATE LN 01 LAKEVIEW AVE END CDS R AC 2 454 33 10/1/2019 Slurry Seal 11/17/2025 69 ARCWY ARC WAY 01 OHIO ST END OF CDS R AC/AC 2 98 33 3/27/2021 AC Overlay 12/15/2025 97 ARIDR ARIES DR 01 SANTA FE ST LIBRA PL R AC 2 525 33 10/2/2018 Slurry Seal 11/6/2025 67 ARIDR ARIES DR 02 LESA PL LAVELL DR R AC 2 339 33 10/2/2018 Slurry Seal 11/6/2025 71 ARRST ARROYO ST 01 VALENCIA AVE MAIN ST R AC 2 555 22 10/1/2019 Slurry Seal 11/11/2025 83 ARRYOCJNEB ARROYO CAJON E/B 01 KELLOG DR FOXFIELD LANE R AC 2 2,046 23 1/24/2022 Slurry Seal 2/3/2026 67 ARRYOCJNWB ARROYO CAJON W/B 01 FOXFIELD LANE KELLOGG R AC 2 2,049 23 1/24/2022 Slurry Seal 12/22/2025 77 ASCTWY ASCOT WY 01 HUMBOLDT LN FAIRPLEX DR R AC 2 226 36 10/2/2018 Slurry Seal 11/13/2025 70 ASPGLOCI ASPENGLOW CIRCLE 01 ASPENGLOW LN END CDS R AC 2 133 33 10/2/2018 Slurry Seal 11/5/2025 68 ASPGLOLN ASPENGLOW LN 01 VALLEY VIEW AVE ASPENGLOW CIRCLE R AC 2 950 33 10/2/2018 Slurry Seal 11/5/2025 68 ASPNWY ASPEN WAY 01 SAN ANTONIO RD END OF STREET R AC/AC 2 355 33 10/1/2023 AC Overlay 2/2/2026 81 ASTR ASTER LN 01 LUPINE ST END CDS R AC/AC 2 279 33 1/20/2022 AC Overlay 1/8/2026 93 AVDDSPCO AVENIDA DE DESPACIO 01 AVENIDA DE MARCIA AVENIDA DE MARCIA R AC/AC 2 2,237 37 7/1/2025 AC Overlay 10/9/2023 100 AVDKRSTN AVE DE KRISTINE 01 AVENIDA DE MARCIA END OF CDS R AC 2 623 37 7/1/2016 Slurry Seal 10/9/2023 76 AVDLESTRLL AVENIDA DE LAS ESTRELLAS 01 END CDS YORBA LINDA BLVD R AC 2 1,794 33 10/2/2023 Slurry Seal 12/3/2025 76 AVDLESTRLL AVENIDA DE LAS ESTRELLAS 02 CAMINO DE LOS CANTOS YORBA LINDA BLVD R AC/AC 2 581 37 3/31/2023 AC Overlay 12/3/2025 100 AVDLLZ AVENIDA DE LA LUZ 01 VISTA DEL SOL END OF CDS R AC/AC 2 744 33 10/1/2023 AC Overlay 12/3/2025 93 AVDLSARBLS AVENIDA DE LOS ARBOLES 01 VIA ROJA VISTA DEL SOL R AC 2 595 33 10/2/2023 Slurry Seal 12/3/2025 79 AVDLSARBLS AVENIDA DE LOS ARBOLES 02 VISTA DEL SOL VISTA DEL NORTE R AC 2 915 33 10/2/2023 Slurry Seal 12/3/2025 80 AVDLSSNS AVENIDA DE LOS SUENOS 01 END OF CDS VIA ROJA R AC/AC 2 284 33 10/1/2023 AC Overlay 12/3/2025 94 AVDLTRN AVENIDA DEL TREN 01 CAMINO VISTA W/S END OF CDS R AC 2 163 26 7/1/2016 Slurry Seal 10/9/2023 69 AVDLTRN AVENIDA DEL TREN 02 CAMINO VISTA W/S VIA LEONARDO R AC 2 1,432 33 7/1/2016 Slurry Seal 10/9/2023 70 AVDMCHLL AVENIDA DE MICHELLE 01 AVENIDA DE MARCIA END OF CDS R AC 2 788 37 7/1/2016 Slurry Seal 10/9/2023 83 AVDMRCA AVENIDA DE MARCIA 01 VIA LOMAS DE YORBA LA CRESCENTA E/S R AC/AC 2 1,843 37 7/1/2025 AC Overlay 10/9/2023 100 AVDMRCA AVENIDA DE MARCIA 02 LA CRESCENTA E/S VIA LOMAS DE YORBA R AC/AC 2 1,652 33 7/1/2025 AC Overlay 10/9/2023 100 AVEADOBE AVENIDA ADOBE 01 AVENIDA ANTIGUA YORBA LINDA BLVD. R AC/AC 2 870 37 3/31/2023 AC Overlay 12/18/2025 100 AVEANT AVENIDA ANTIGUA 01 AVENIDA FLORENCIA END CDS R ST 2 1,850 33 3/31/2023 Reconstruct Surface (ST) 12/18/2025 100 AVEBAR AVENIDA BARCELONA 01 ESPERANZA ROAD END CDS R AC/AC 2 770 33 3/31/2023 Slurry Seal 1/29/2026 66 AVEDEAMR AVENIDA DE AMOR 01 PASEO DE LAS PALOMAS END CDS R AC/AC 2 760 33 3/31/2023 AC Overlay 12/5/2025 100 AVEDLPZ AVE DE LA PAZ 01 EASTSIDE END OF CDS R AC 2 560 16 10/2/2023 Slurry Seal 12/3/2025 92 A - Arterials, C - Collectors, O - Alleyways, R - Residentials, U - Urban Principal Arterials AC - Asphalt Concrete, AC/AC - Asphalt Concrete Overlay of existing Asphalt Concrete, ST - Surface Treatment Page 865 of 1224 1 of 25 4/29/2026 City of Yorba Linda
2026 Pavement Management Program Update
Section Description Inventory
Local Network
Sorted by Name
Street ID Street Name
Section
ID Beg Location End Location Functional Class
Surface
Type
# Lanes Length
(LF)
Width
(LF) Last Treatment Date Last Treatment PCI Date PCI
AVEFLOR AVENIDA FLORENCIA 01 CALLE DELGADO END CDS R ST 2 870 33 3/31/2023 Reconstruct Surface (ST) 12/18/2025 100 AVEGRAN AVENIDA GRANADA 01 CALLE ENTRADA AVENIDA BARCELONA R AC/AC 2 600 33 3/31/2023 AC Overlay 12/18/2025 100 AVMORE AVIEMORE DR 01 STONEHAVEN DR END OF CDS R AC 2 2,197 37 7/1/2024 Crack Seal + Slurry Seal 2/11/2026 73 AVNDEADBE AVENIDA ADOBE 01 NEW RIVER YORBA LINDA BLVD R AC 2 1,813 37 10/2/2023 Slurry Seal 1/29/2026 45 AVOLDR AVOLINDA DR 01 AVOCADO AVE END CDS R AC 2 177 33 10/1/2019 Slurry Seal 11/17/2025 69 AVOLDR AVOLINDA DR 02 AVOCADO AVE CAMELA LN R AC 2 150 33 10/1/2019 Slurry Seal 11/17/2025 66 AVOLDR AVOLINDA DR 03 BOEING AVE END R AC 2 386 33 10/1/2019 Slurry Seal 11/17/2025 69 AVOLDR AVOLINDA DR 04 PLUMOSA DR END CDS R AC 2 960 33 10/1/2019 Slurry Seal 11/7/2025 70 AVOLDR AVOLINDA DR 05 PLUMOSA DR EUREKA AVE R AC 2 1,275 33 10/1/2019 Slurry Seal 11/7/2025 74 AZELA AZELA CIRCLE 01 WOODLAND AVE END OF CDS R AC 2 408 33 7/1/2016 Slurry Seal 10/9/2023 71 AZFRN VIA AZAFRAN 01 PASEO DE LAS PALOMAS VIA MARWAH R AC/AC 2 1,390 48 3/31/2023 AC Overlay 12/5/2025 99 BCH BEECH AVE 01 MANZANITA AVE PEPPER AVE R AC/AC 2 1,674 27 10/1/2023 AC Overlay 12/2/2025 98 BELGLN BELGIAN LN 01 PASO FINO WY CDS R AC 2 405 32 10/2/2018 Slurry Seal 11/19/2025 85 BERHILDR BERRYHILL DR 01 BUENA VISTA AVE END CDS R AC/AC 2 858 33 3/27/2021 AC Overlay 12/15/2025 97 BGHRNMTN BIG HORN MTN WAY 01 CAMINO DE BRYANT END CDS R AC 2 1,706 33 7/1/2016 Slurry Seal 10/19/2023 96 BGHRNMTN BIG HORN MTN WAY 02 CAMINO DE BRYANT N END CDS R AC 2 135 33 7/1/2016 Slurry Seal 10/19/2023 94 BGONIA BEGONIA DR 01 YORBA RANCH RD JACARANDA LN R AC/AC 2 492 33 10/1/2023 AC Overlay 1/30/2026 83 BGSPRNG BIG SPRING DR 01 FAIRMONT BLVD WALNUT CREEK DR R AC 2 230 33 1/24/2022 Slurry Seal 12/17/2025 77 BIDWEDR BIDWELL DR 01 DRAKE ST END CDS R AC 2 1,014 35 10/2/2018 Slurry Seal 11/4/2025 74 BIGOKLN BIG OAK LN 01 SILVER DOLLAR WY VALLEY VIEW CIR R AC 2 586 33 10/2/2018 Slurry Seal 11/3/2025 69 BIRHCIR BIRCH CIR 01 SMOKETREE END CDS R AC 2 250 27 7/1/2015 AC Overlay 2/2/2026 14 BLBOA VIA BILBAO 01 AVENIDA EL CID END CDS R AC 2 167 33 3/31/2023 Slurry Seal 1/29/2026 60 BLCKPNE BLACK PINE CIR 01 FAIRMONT BL END CDS R AC/AC 2 169 33 10/1/2023 AC Overlay 12/2/2025 97 BLERDGE BLUE RIDGE DR 01 BIG HORN MTN END OF CDS R AC 2 1,562 28 7/1/2016 Slurry Seal 10/19/2023 79 BLKBRRYWY BLACKBERRY WAY 01 BAYBERRY WAY ELDERBERRY WAY R AC 2 658 33 7/1/2016 Slurry Seal 10/11/2023 74 BLKFRST BLACK FOREST LN 01 FAIRMONT BL END CDS R AC 2 512 33 10/2/2023 Slurry Seal 12/2/2025 81 BLKWNTCT BLACK WALNUT CT 01 SILVER DOLLAR WY CDS R AC 2 475 34 10/2/2018 Slurry Seal 11/3/2025 74 BLLAVSTA VIA BELLA VISTA 01 AVENIDA DEL ESTE END CDS R AC 2 568 33 7/1/2009 Slurry Seal 11/12/2025 74 BLLZA VIA BELLEZA 01 VIA AZAFRAN END CDS R AC/AC 2 188 33 3/31/2023 AC Overlay 12/5/2025 100 BLNTREE BALAN TREE CIRCLE 01 GREENHAVEN ST END OF CDS R AC 2 106 33 7/1/2024 Crack Seal + Slurry Seal 2/2/2026 70 BLUBRKLNE BLUEBROOK LANE 01 BRUSH CANYON N/S END OF CDS R AC/AC 2 534 33 7/1/2024 AC Overlay 10/11/2023 100 BLUBRRY BLUEBERRY ST 01 SHORT ST END OF CDS R AC 2 417 33 5/28/2021 Slurry Seal 12/15/2025 95 BLUFLDPLZA BLUEFIELD PLAZA 01 OAK MEADOW DR END CDS R AC 2 671 33 1/24/2022 Slurry Seal 12/12/2025 74 BLUGM BLUE GUM DR 01 RIM CREST DR END CDS R AC/AC 2 800 37 12/1/2022 2" Grind & Cap 12/2/2025 95 BLUGRSSLNE BLUE GRASS LANE 01 MEADOWLAND DR END OF CDS R AC 2 151 33 7/1/2024 Crack Seal + Slurry Seal + MM + LI + BR 10/11/2023 75 BLUMTN BLUE MTN DR 01 STONEHAVEN DR END CDS R AC 2 777 37 7/1/2024 Crack Seal + Slurry Seal 12/3/2025 76 BLUSPRLN BLUE SPRUCE LN 01 RED PINE RD SILVER MAPLE DR R AC 2 1,884 38 10/2/2018 Slurry Seal 11/3/2025 80 BNNVS BEN NEVIS WAY 01 KODIAK MOUNTAIN DR END CDS R AC 2 846 33 7/1/2025 Crack Seal + Slurry Seal + MM + LI + BR 10/10/2023 93 BOEAVE BOEING AVE 01 LA CASITAS AVE ORIENTE DR R AC 2 890 33 10/1/2019 Slurry Seal 11/17/2025 70 BRAMCT BRAMBLE CT 01 VALLEY VIEW CIR CDS R AC 2 1,425 38 10/2/2018 Slurry Seal 11/3/2025 75 BRDLE BRIDLE LN 01 SADDLETREE LN END OF CDS R AC 2 359 33 1/24/2022 Slurry Seal 12/17/2025 75 BRETLN BRETON LN 01 CLYDESDALE DR CDS R AC 2 287 32 10/2/2018 Slurry Seal 11/19/2025 63 BRIADR BRIARHILL DR 01 ORANGE DR END CDS R AC 2 875 37 10/2/2018 Slurry Seal 11/6/2025 65 BRIADR BRIARHILL DR 02 FOLEY DR ORANGE DR R AC 2 1,122 37 10/2/2018 ARHM Overlay 11/6/2025 79 BRIADR BRIARHILL DR 03 LA COLLETTE PL HILLWOOD DR R AC 2 647 33 5/28/2021 Slurry Seal 12/3/2025 93 BRIARLN BRIARDALE LN 01 VALLEY VIEW AVE CARLTON PL R AC 2 482 33 10/2/2018 Slurry Seal 2/3/2026 34 BRISCONLN BRISTLE CONE LN 01 TORREY PINE PL SUGAR PINE DR R AC/AC 2 585 33 3/27/2021 AC Overlay 12/3/2025 97 BRITNYWY BRITTANY WAY 01 VILLAGE CENTER DRIVE CHANDLER DRIVE R AC 2 125 30 3/31/2023 Slurry Seal 12/17/2025 94 A - Arterials, C - Collectors, O - Alleyways, R - Residentials, U - Urban Principal Arterials AC - Asphalt Concrete, AC/AC - Asphalt Concrete Overlay of existing Asphalt Concrete, ST - Surface Treatment Page 866 of 1224 2 of 25 4/29/2026 City of Yorba Linda
2026 Pavement Management Program Update
Section Description Inventory
Local Network
Sorted by Name
Street ID Street Name
Section
ID Beg Location End Location Functional Class
Surface
Type
# Lanes Length
(LF)
Width
(LF) Last Treatment Date Last Treatment PCI Date PCI
BRKHLL BROOKHILL DR 01 OLD RANCH END CDS R AC 2 1,506 33 1/24/2022 Slurry Seal 12/12/2025 72 BRKLYN BROOKLYN AVE 01 DENVER AVE CASA LOMA AVE R AC 2 253 33 10/2/2018 Slurry Seal 11/7/2025 71 BRKLYN BROOKLYN AVE 02 PROSPECT AVE THIRD ST R AC 2 1,289 37 10/2/2018 Slurry Seal 10/31/2025 88 BRKLYN BROOKLYN AVE 03 THIRD ST SECOND ST R AC 2 610 37 10/2/2018 Slurry Seal 10/31/2025 70 BRKLYN BROOKLYN AVE 04 SECOND ST VALLEY VIEW AVE R AC 2 614 37 10/2/2018 Slurry Seal 10/31/2025 69 BRKLYN BROOKLYN AVE 05 VALLEY VIEW AVE END CDS R AC 2 488 28 7/1/2009 Slurry Seal 10/31/2025 84 BRKMNT BROOKMONT DR 01 END CDS CANYON DR R AC 2 1,498 36 1/24/2022 Slurry Seal 12/12/2025 79 BRLGH BURLEIGH DR 01 MANOR VIEW DR END CDS R AC/AC 2 655 33 1/20/2022 AC Overlay 1/8/2026 78 BRNTWD BRENTWOOD PL 01 MISSION HILLS LN END OF CDS R AC 2 1,168 33 10/2/2023 Slurry Seal 12/3/2025 84 BROKWYAV BROOKWAY AVE 01 SAGA DR ORANGE DR R AC 2 527 33 10/2/2018 Slurry Seal 11/6/2025 78 BRSBN BRISBANE WAY 01 DUNROBIN END OF CDS R AC 2 228 33 7/1/2024 Crack Seal + Slurry Seal 12/3/2025 67 BRSHCYN BRUSH CANYON DR 01 CAMINO DE BRYANT E/S MEADOW LAND DR W/S R AC 2 2,053 37 7/1/2025 Crack Seal + Slurry Seal + MM + LI + BR 10/11/2023 76 BRSHCYN BRUSH CANYON DR 02 MEADOW LAND DR W/S MEADOW LAKE LN W/S R AC 2 2,193 37 7/1/2025 Crack Seal + Slurry Seal + MM + LI + BR 10/11/2023 76 BRSHCYN BRUSH CANYON DR 03 MEADOW LAKE LN W/S END OF CDS R AC 2 1,368 37 7/1/2025 Crack Seal + Slurry Seal + MM + LI + BR 10/11/2023 66 BUCSKNCI BUCKSKIN CIRCLE 01 SILVER SPURS LN END CDS R AC 2 252 33 10/1/2019 Slurry Seal 11/18/2025 79 BUEVISAV BUENA VISTA AVE 01 JEFFERSON ST CITY LIMIT R AC 3 1,340 30 7/1/2002 Slurry Seal 12/4/2025 61 BUEVISAV BUENA VISTA AVE 02 100'' E/O MAMMOTH ST RICHFIELD RD R AC 5 2,460 60 5/28/2021 Slurry Seal 12/4/2025 74 BUEVISAV BUENA VISTA AVE 03 RICHFIELD RD E HIGHLAND R AC 2 1,940 60 5/28/2021 Slurry Seal 12/4/2025 75 BUEVISAV BUENA VISTA AVE 04 E HIGHLAND LAKEVIEW AVE R AC 2 1,012 60 5/28/2021 Slurry Seal 12/4/2025 77 BUEVISAV BUENA VISTA AVE 05 LAKEVIEW AVE SCENIC VIEW DR R AC 2 2,000 30 5/28/2021 Slurry Seal 12/4/2025 83 BUEVISAV BUENA VISTA AVE 06 SCENIC VIEW DR IMPERIAL HWY R AC 2 120 24 5/28/2021 Slurry Seal 12/4/2025 88 BUEVISAV BUENA VISTA AVE 07 IMPERIAL HWY GRANDVIEW AVE R AC 2 1,571 27 5/28/2021 Slurry Seal 12/22/2025 74 BURCHCI BURCHIT CIRCLE 01 TORREY PINE PL END CDS R AC/AC 2 311 33 3/27/2021 AC Overlay 12/3/2025 97 BURKWDCIR BURKWOOD CIRCLE 01 ORANGE GATE DR END CDS R AC 2 353 33 5/28/2021 Slurry Seal 12/15/2025 97 BXCNYN BOX CANYON CT 01 VIA LOMAS DE YORBA END OF CDS R AC 2 770 37 7/1/2016 Slurry Seal 10/9/2023 64 BYBRRY BAYBERRY WAY 01 BRUSH CANYON DR END OF CDS R AC 2 820 33 7/1/2016 Slurry Seal 10/11/2023 66 BYCRCI BYCROFT CIRCLE 01 LANDMARK AVE END CDS R AC 2 168 33 10/2/2018 Slurry Seal 10/30/2025 70 CABADR CABALLO DR 01 BUENA VISTA AVE END CDS R AC 2 820 33 5/28/2021 Slurry Seal 12/15/2025 90 CALGAV CALGARY AVE 01 RAINTREE ST VAN BUREN ST R AC/AC 2 745 33 3/27/2021 AC Overlay 12/9/2025 97 CALGAV CALGARY AVE 02 CASA LOMA AVE END CDS R AC 2 553 33 5/28/2021 Slurry Seal 12/9/2025 96 CALLALC CALLE ALCAZAR 01 AVENIDA FLORENCIA END CDS R AC/AC 2 110 33 3/31/2023 AC Overlay 12/18/2025 96 CALLCUER CALLE CUERVO 01 AVENIDA GRANADA END CDS R AC/AC 2 300 33 3/31/2023 AC Overlay 12/18/2025 100 CALLDEL CALLE DELGADO 01 AVENIDA BARCELONA AVENIDA ANTIGUA R AC/AC 2 755 33 3/30/2023 AC Overlay 12/18/2025 99 CALLENTRA CALLE ENTRADA 01 ESPERANZA ROAD END CDS R AC/AC 2 680 33 3/30/2023 AC Overlay 12/18/2025 100 CALLESON CALLE SONORA 01 VIA MARIPOSA AVENIDA ADOBE R AC/AC 2 1,300 33 3/31/2023 AC Overlay 12/18/2025 100 CALLEVSTLI CALLE VISTA LINDA 01 N END CDS S END CDS R AC/AC 2 700 33 3/31/2023 AC Overlay 12/18/2025 98 CALVISTALE CALLE VISTA ALEGRE 01 PASEO DE LA CUMBRE END CDS R AC/AC 2 800 34 10/1/2023 AC Overlay 2/11/2026 80 CAMCABR CAMINO CABRILLO 01 VALLEY VIEW CIR VISTA VIZCAINO R AC 2 392 33 10/2/2018 Slurry Seal 11/3/2025 74 CAMCER CAMINO CERMENON 01 VISTA MORAGA VISTA MENDOZA R AC 2 455 33 10/2/2018 Slurry Seal 11/3/2025 66 CAMCLARO CAMINO CLARO 01 VIA VALLARTA VIA LAS BRISAS R AC 2 225 37 7/1/2016 Slurry Seal 10/19/2023 54 CAMGAL CAMINO GALVEZ 01 CAMINO CERMENON VISTA MENDOZA R AC 2 306 33 7/1/2009 Slurry Seal 11/3/2025 68 CAMINAYA CAMINO AYALA 01 VISTA VISCAINO END CDS R AC 2 222 33 10/2/2018 Slurry Seal 11/3/2025 71 CAMST CAMELA ST 01 AVOLINDA DR LA CASITAS AVE R AC 2 413 33 10/1/2019 Slurry Seal 11/17/2025 65 CAMST CAMELA ST 02 LA CASITAS AVE END CDS R AC 2 316 33 10/1/2019 Slurry Seal 11/17/2025 70 CANDLIGTLN CANDLELIGHT LANE 01 MARIPOSA AVE END CDS R AC 2 471 33 5/28/2021 Slurry Seal 12/15/2025 79 CARLN CARI LN 01 KAYE LN PLUMOSA DR R AC 2 513 33 10/1/2019 Slurry Seal 11/11/2025 69 CARLPL CARLTON PL 01 RIDGEDALE LN BRIARDALE LN R AC 2 200 33 10/2/2018 Slurry Seal 11/4/2025 77 CARLRD CARLOS ROAD 01 PASEO SERRA YORBA RANCH RD. R AC/AC 2 1,180 33 10/1/2023 AC Overlay 12/17/2025 96 A - Arterials, C - Collectors, O - Alleyways, R - Residentials, U - Urban Principal Arterials AC - Asphalt Concrete, AC/AC - Asphalt Concrete Overlay of existing Asphalt Concrete, ST - Surface Treatment Page 867 of 1224 3 of 25 4/29/2026 City of Yorba Linda
2026 Pavement Management Program Update
Section Description Inventory
Local Network
Sorted by Name
Street ID Street Name
Section
ID Beg Location End Location Functional Class
Surface
Type
# Lanes Length
(LF)
Width
(LF) Last Treatment Date Last Treatment PCI Date PCI
CAROT CAROT CT 01 VAN GOGH WAY END OF CDS R AC 2 20 33 7/1/2016 Slurry Seal 10/10/2023 91 CARRAICI CARRAIGE CIRCLE 01 WINDMERE DR WINDMERE DR R AC 2 671 33 10/1/2013 Cape Seal 12/4/2025 69 CARRERD CARRERA RD 01 BASTANCHURY RD CHIANTI CT R AC 2 140 55 N/A N/A 11/13/2025 68 CARSWY CARSON WAY 01 VALLEY VIEW CIR FREMONT LN R AC 2 324 33 10/2/2018 Slurry Seal 11/3/2025 93 CASCADAV CASCADES AVE 01 REDWOOD ST CITY LIMIT R AC 2 653 33 11/1/2012 AC Overlay 12/4/2025 74 CASHERM CASA HERMOSA DR 01 CASA ORO DR END CDS R AC 2 543 33 10/2/2018 Slurry Seal 11/5/2025 70 CASLOMCI CASA LOMA CIRCLE 01 YORBLA LINDA BLVD END CDS R AC/AC 2 85 33 7/1/2019 AC Overlay 11/5/2025 93 CASOR CASA ORO DR 01 REGULUS DR END CDS R AC 2 370 37 10/2/2018 Slurry Seal 11/7/2025 93 CASOR CASA ORO DR 02 EL CAJON AVE END CDS R AC 2 400 33 10/2/2018 Slurry Seal 11/5/2025 62 CASOR CASA ORO DR 03 EL CAJON AVE ORANGE DR R AC 2 1,753 33 10/2/2018 Slurry Seal 1/16/2026 67 CASOR CASA ORO DR 04 HILLWOOD DR LA COLLETTE PL R AC/AC 2 667 33 3/27/2021 AC Overlay 12/3/2025 95 CASSDR CASSON DR 01 SHANE WAY END R AC 2 790 33 5/28/2021 Slurry Seal 12/10/2025 72 CASSDR CASSON DR 02 CHARMAINE LN END R AC 2 330 33 5/28/2021 Slurry Seal 12/10/2025 83 CDZES VIA CADIZ E/S 01 VIA SANTANDER END CDS R AC 2 116 33 3/31/2023 Slurry Seal 1/16/2026 66 CDZWS VIA CADIZ W/S 01 VIA SANTANDER VIA CARTAGENA R AC/AC 2 379 33 3/31/2023 AC Overlay 12/5/2025 100 CEDAV CEDAR AVE 01 EVERGREEN AVE END CDS R AC 2 604 34 10/1/2019 Slurry Seal 11/18/2025 78 CHANDDR CHANDLER DRIVE 01 KLINE LANE GALLAL WAY R AC 2 890 33 3/31/2023 Slurry Seal 12/17/2025 95 CHARMLN CHARMAINE LN 01 RICH HILL WAY CASSON DR R AC 2 324 37 5/28/2021 Slurry Seal 12/10/2025 92 CHCGO CHICAGO AVE 01 THIRD ST END CDS R AC 2 502 33 10/2/2018 Slurry Seal 11/7/2025 49 CHCGO CHICAGO AVE 02 THIRD ST SECOND ST R AC 2 624 37 10/2/2018 Slurry Seal 11/7/2025 68 CHCGO CHICAGO AVE 03 SECOND ST END CDS R AC 2 479 37 10/2/2018 Slurry Seal 11/7/2025 78 CHIANCT CHIANTI CT 01 TRENTINO LN GENOA WY R AC 2 2,378 33 N/A N/A 11/13/2025 80 CHNNNGES CHANNING LN E/S 01 LINDSEY DR END CDS R AC 2 993 33 3/31/2023 Slurry Seal 12/6/2025 89 CHNNNGWS CHANNING LN W/S 01 LINDSEY DR END CDS R AC 2 768 33 3/31/2023 Slurry Seal 12/6/2025 81 CHPRRLRDGE CHAPARRAL RIDGE DR 01 RIM CREST DR END CDS R AC/AC 2 322 33 12/1/2022 2" Grind & Cap 12/2/2025 92 CHRISTIE CHRISTIE DR 01 CASA LOMA AVE END CDS R AC 2 473 33 10/1/2019 Slurry Seal 2/9/2026 41 CHRTROK CHARTER OAKS TERRACE 01 FAIRMONT BLVD END CDS R AC/AC 2 228 33 10/1/2023 AC Overlay 12/2/2025 99 CHSTNT CHESTNUT ST 01 PROSPECT ST SIXTH ST R AC 2 754 37 10/2/2018 Slurry Seal 10/31/2025 56 CHSTNT CHESTNUT ST 02 THIRD ST END CDS R AC 2 512 33 10/2/2018 Slurry Seal 2/6/2026 43 CHSTNTES CHESTNUT ST 01 THIRD ST SECOND ST R AC 2 615 33 10/2/2018 Slurry Seal 2/2/2026 34 CHTEAU CHATEAU AVE 01 SINGINGWOOD DR END CDS R AC/AC 2 630 33 10/1/2023 AC Overlay 12/2/2025 94 CHURCDOWDRCHURCHILL DOWNS DR 01 OAKLAWN LN CDS R AC 2 327 33 10/2/2018 Slurry Seal 11/17/2025 86 CIRCDUR CIRCULO DURANGO 01 PASEO TORTUGA END CDS R AC/AC 2 135 33 10/1/2023 AC Overlay 2/11/2026 81 CIRCLOMA CIRCULO LOMA 01 PASEO DEL PRADO END CDS R AC 2 110 34 3/31/2023 Slurry Seal 12/22/2025 69 CIRCNUEV CIRCULO NUEVO 01 VIA MARIPOSA END CDS R AC 2 105 33 3/31/2023 Slurry Seal 1/29/2026 37 CIRCVBAJO CIRCULO BAJO 01 PASEO PANORAMA END CDS R AC/AC 2 160 33 3/31/2023 AC Overlay 12/5/2025 100 CIRCVISTA CIRCULO VISTA 01 PASEO DEL PRADO END CDS R AC 2 200 34 3/31/2023 Slurry Seal 12/22/2025 72 CITALN CITATION LN 01 SECRETARIAT WY SEABISCUIT RUN R AC 2 302 38 10/1/2019 Slurry Seal 11/17/2025 70 CITRCI CITRUS CIRCLE 01 BASTANCHURY RD END CDS R AC 2 461 33 10/2/2018 Slurry Seal 11/6/2025 79 CITRDOAV CITRIO DORA AVE 01 SYCAMORE CIRCLE EVERGREEN AVE R AC 2 290 34 10/1/2019 Slurry Seal 11/18/2025 75 CLBTERRC CLUB TERRACE DR 01 YORBA LINDA BLVD FAIRWAY VIEW R AC 2 853 33 5/28/2021 Slurry Seal 12/22/2025 71 CLDRON VIA CALDERON 01 VIA SANTANDER END CDS R AC 2 216 33 3/31/2023 Slurry Seal 1/29/2026 50 CLEVLNBYLN CLEVELAND BAY LN 01 PASO FINO WY JUTLAND LN R AC 2 1,498 32 10/2/2018 Slurry Seal 11/19/2025 67 CLEVLNBYLN CLEVELAND BAY LN 02 JUTLAND LN CDS R AC 2 341 32 10/2/2018 Slurry Seal 11/19/2025 81 CLLBNTA CALLE BONITA 01 END OF CDS VIA ROJA R AC/AC 2 259 33 10/1/2023 AC Overlay 12/3/2025 89 CLLEBLLAES CALLE BELLA E/S 01 PASE DEL PRADO END CDS R AC 2 350 33 3/31/2023 Slurry Seal 2/11/2026 38 CLLEBLLAWS CALLE BELLA W/S 01 PASEO DEL PRADO END CDS R AC 2 104 33 3/31/2023 Slurry Seal 12/22/2025 79 CLLEDLLDRA CALLE DE LA LADERA 01 PASEO DE LA RAMBLA END CDS R AC/AC 2 451 33 10/1/2023 AC Overlay 1/29/2026 86 A - Arterials, C - Collectors, O - Alleyways, R - Residentials, U - Urban Principal Arterials AC - Asphalt Concrete, AC/AC - Asphalt Concrete Overlay of existing Asphalt Concrete, ST - Surface Treatment Page 868 of 1224 4 of 25 4/29/2026 City of Yorba Linda
2026 Pavement Management Program Update
Section Description Inventory
Local Network
Sorted by Name
Street ID Street Name
Section
ID Beg Location End Location Functional Class
Surface
Type
# Lanes Length
(LF)
Width
(LF) Last Treatment Date Last Treatment PCI Date PCI
CLLEFLIZ CALLE FELIZ 01 AVE DE LAS ESTRELLAS END CDS R AC/AC 2 100 33 3/31/2023 AC Overlay 12/6/2025 99 CLLEMNZNA CALLE MANZANA 01 CALLE TRANQUILLO CAMINO DE LOS CANTOS R AC 2 267 33 3/31/2023 Slurry Seal 12/6/2025 85 CLLEPRA CALLE PERA 01 PASEO DE LAS PALOMAS END CDS R AC 2 337 33 3/31/2023 Slurry Seal 12/6/2025 74 CLLETRNQLL CALLE TRANQUILLO 01 AVENIDA DE LOS REYES END CDS R AC 2 590 33 3/31/2023 Slurry Seal 12/6/2025 79 CLOVEWY CLOVERDALE WY 01 VALLEY VIEW CIR END CDS R AC 2 925 33 10/2/2018 Slurry Seal 11/3/2025 79 CLRHVN CLEAR HAVEN DR 01 HICKORY TREE END CDS R AC 2 342 33 10/2/2023 Slurry Seal 12/2/2025 85 CLRWTR CLEARWATER DR 03 GRANBY DR ROANOKE AVE R AC 2 1,120 27 10/2/2023 Slurry Seal 12/6/2025 76 CLVRHIL CLOVER HILL DR 01 BUENA VISTA AVE END CDS R AC 2 340 33 5/28/2021 Slurry Seal 12/15/2025 89 CLYDSDLEDR CLYDESDALE DR 01 BASTANCHURY RD BRETON LN R AC 2 1,462 47 10/2/2018 Slurry Seal 11/19/2025 79 CMNCLRSO CAMINO CALUROSO 01 VISTA LAMPARA END OF CDS R AC 2 712 33 7/1/2016 Slurry Seal 10/9/2023 54 CMNDLSCNTS CAMINO DE LOS CANTOS 01 CALLE MANZANA VIA VENTOSA R AC 2 500 33 3/31/2023 Slurry Seal 12/6/2025 76 CMNO TCTE CAMINO TECATE 01 VIA NUEVA END OF CDS R AC 2 514 33 7/1/2016 Slurry Seal 10/17/2023 63 CMNOBSR CAMINO BESAR 01 VIA BUENA SUERTE END OF CDS R AC 2 567 33 7/1/2016 Slurry Seal 10/19/2023 59 CMNODEBYNTCAMINO DE BRYANT 01 BRUSH CANYON DR LA PALMA AVE R AC 2 1,042 38 7/1/2025 Crack Seal + Slurry Seal + MM + LI + BR 10/20/2023 76 CMNODEBYNTCAMINO DE BRYANT 02 KODIAK MTN END CDS R AC 2 960 33 7/1/2016 Slurry Seal 10/19/2023 95 CMNODEBYNTCAMINO DE BRYANT 03 KODIAK MTN N/S MAIDEN MOOR N/S R AC 2 2,236 33 7/1/2025 Crack Seal + Slurry Seal + MM + LI + BR 10/19/2023 77 CMNODEBYNTCAMINO DE BRYANT 04 MAIDEN MOOR N/S PASEO DE TORONTO N/S R AC 2 2,069 33 7/1/2025 Crack Seal + Slurry Seal + MM + LI + BR 10/19/2023 82 CMNODEBYNTCAMINO DE BRYANT 05 PASEO DE TORONTO BRUSH CANYON DR R AC 2 2,130 38 7/1/2025 Crack Seal + Slurry Seal + MM + LI + BR 10/20/2023 67 CMNODRDO CAMINO DORADO 01 VIA MELINDA VIA LAS BRISAS R AC 2 704 33 7/1/2016 Slurry Seal 10/19/2023 56 CMNOFMS CAMINO FAMOSA 01 VIA MELINDA VIA LAS BRISAS R AC 2 715 37 7/1/2016 Slurry Seal 10/17/2023 68 CMNOPNT CAMINO PONIENTE 01 VIA BUENA SUERTE END OF CDS R AC 2 346 33 7/1/2016 Slurry Seal 10/19/2023 58 CMNOVSTA CAMINO VISTA 01 VIA LENARDO AVENIDA DEL TREN R AC 2 954 33 7/1/2016 Slurry Seal 10/9/2023 72 CMPHRES CAMPHOR E/S 01 MANZANITA AVE END CDS R AC/AC 2 391 33 10/1/2023 AC Overlay 2/11/2026 89 CMPHRWS CAMPHOR W/S 01 MANZANTIA AVE END CDS R AC 2 925 33 10/2/2023 Slurry Seal 2/11/2026 80 CMROSA CAMAROSA DR 01 LA TIERRA LN FAIRMONT BL R AC/AC 2 345 36 7/1/2019 AC Overlay 11/13/2025 96 CNDLBRRYLN CANDLE BERRY LANE 01 BRUSH CANYON DR END OF CDS R AC 2 140 33 7/1/2016 Slurry Seal 10/11/2023 65 CNDRRDGE CONDOR RIDGE RD 01 FAIRMONT BLVD END CDS R AC/AC 2 1,211 33 10/1/2023 AC Overlay 12/2/2025 97 CNTRYVW COUNTRY VIEW DR 01 END CDS ACACIA HILL DR R AC 2 2,468 33 1/24/2022 Slurry Seal 12/17/2025 67 CNYNDRVE CANYON DRIVE 01 BROOKMONT DR FAIRMONT BLVD R AC 2 2,964 33 1/24/2022 Slurry Seal 12/17/2025 82 CNYNTRRCE CANYON TERRACE DR 01 FAIRMONT BLVD END OF CDS R AC/AC 2 460 27 10/1/2023 AC Overlay 12/2/2025 92 COBBLSTCT COBBLESTONE CT 01 QUIET MEADOW LN END CDS R AC 2 109 33 10/1/2019 Slurry Seal 11/17/2025 87 COCHWD COACHWOOD LN 01 FAIRMONT BLVD END OF CDS R AC/AC 2 460 37 1/20/2022 AC Overlay 12/17/2025 89 COLONIACT COLONIAL CT 01 SPYGLASS HILL CDS R AC 2 150 33 10/2/2018 Slurry Seal 11/19/2025 70 COMPASS COMPASS CIR 01 BASTANCHURY END CDS R AC 2 431 37 10/2/2018 Slurry Seal 1/16/2026 62 CONGRESCT CONGRESSIONAL CT 01 SPYGLASS HILL CDS R AC 2 132 33 10/2/2018 Slurry Seal 11/19/2025 70 CONNMARCT CONNEMARA CT 01 BRETON LN CDS R AC 2 944 32 10/2/2018 Slurry Seal 11/19/2025 66 CORTCT CORTONA CT 01 E CDS W CDDS R AC/AC 2 1,496 33 12/12/2022 2" Grind & Cap 11/13/2025 93 CORWOOCI CORALWOOD CIRCLE 01 CASA ORO DR END CDS R AC 2 104 37 10/2/2018 Slurry Seal 11/7/2025 69 COUPCT COUPLES CT 01 HOGAN DR CDS R AC 2 157 33 10/2/2018 Slurry Seal 11/18/2025 78 COVENLN COVENTRY LN 01 RAINTREE ST END CDS R AC 2 622 33 5/28/2021 Slurry Seal 12/9/2025 70 CPRCEDR CAPRICE DR 01 MANOR VIEW END CDS R AC/AC 2 680 33 1/20/2022 AC Overlay 1/8/2026 84 CRBT CORBIT PLACE 01 LA PALMA END OF CDS O AC 2 200 42 7/1/2016 Slurry Seal 3/5/2020 84 CRCLODLSOL CIRCULO DEL SOL 01 PASEO DE LA RAMBLA END CDS R AC/AC 2 190 33 10/1/2023 AC Overlay 12/22/2025 90 CRDFF CARDIFF DR 01 HEATHERIDGE DR END CDS R AC 2 323 31 7/1/2024 Crack Seal + Slurry Seal 2/2/2026 100 CRDVA CORDOVA LN 01 FAIRMONT BLVD MARSALA DR R AC 2 160 48 10/1/2019 Slurry Seal 1/16/2026 75 CRESTBELAV CRESTA BELLA AVE 01 EL CAJON AVE END CDS R AC 2 240 33 10/2/2018 Slurry Seal 11/6/2025 49 CRSCNT CRESCENT DR 01 MISSION HILLS END OF CDS R AC 2 407 33 10/2/2023 Slurry Seal 1/30/2026 58 CRSTKNLL CRESTKNOLL DR 01 CANYON DR CITY BOUNDARY R AC 2 874 36 1/24/2022 Slurry Seal 12/17/2025 82 A - Arterials, C - Collectors, O - Alleyways, R - Residentials, U - Urban Principal Arterials AC - Asphalt Concrete, AC/AC - Asphalt Concrete Overlay of existing Asphalt Concrete, ST - Surface Treatment Page 869 of 1224 5 of 25 4/29/2026 City of Yorba Linda
2026 Pavement Management Program Update
Section Description Inventory
Local Network
Sorted by Name
Street ID Street Name
Section
ID Beg Location End Location Functional Class
Surface
Type
# Lanes Length
(LF)
Width
(LF) Last Treatment Date Last Treatment PCI Date PCI
CRTGNA VIA CARTAGENA 01 VIA CADIZ VIA CRISTAL R AC/AC 2 476 33 3/31/2023 AC Overlay 12/5/2025 98 CRTGNA VIA CARTAGENA 02 VIA CRISTAL END CDS R AC 2 526 33 3/31/2023 Slurry Seal 12/5/2025 81 CRYSTL CRYSTAL DR 01 MIRAGE ST BRIDGE @ WEIR CANYON C AC 5 840 61 7/1/2016 Slurry Seal 10/19/2023 73 CSANO CASIANO DR 01 RAVENNA VERONA LN R AC 2 434 36 10/1/2019 Slurry Seal 11/13/2025 70 CSLOM CASA LOMA AVE 02 BROOKLYN AVE BASTANCHURY RD R AC 2 1,152 33 10/2/2018 Slurry Seal 11/7/2025 81 CSLOM CASA LOMA AVE 03 YORBA LINDA BLVD IMPERIAL HWY R AC 2 2,630 37 5/28/2021 Slurry Seal 11/20/2025 67 CSLOM CASA LOMA AVE 04 YORBA LINDA BLVD CALGARY AVE R AC 2 1,148 33 10/1/2013 Slurry Seal 12/9/2025 96 CSLOM CASA LOMA AVE 05 END END CDS R AC 2 481 33 5/28/2021 Slurry Seal 12/15/2025 97 CSNORDGE CASINO RIDGE RD 01 SAN ANTONIO RD END OF ROAD R AC 2 109 33 10/2/2023 Slurry Seal 12/2/2025 76 CSSIA CASSIA LN 01 PEPPER AVE END CDS R AC/AC 2 1,237 27 10/1/2023 AC Overlay 12/2/2025 90 CSTLEBND CASTLE BEND WAY 01 KODIAK MTN END OF CDS R AC 2 731 28 7/1/2025 Crack Seal + Slurry Seal + MM + LI + BR 10/19/2023 93 CSTLERCK CASTLE ROCK RD 01 TIMBERRIDGE RD END CDS R AC/AC 2 722 33 10/1/2023 AC Overlay 12/2/2025 100 CTTNWDES COTTONWOOD RD E/S 01 HICKORY END CDS R AC 2 664 33 3/31/2023 Slurry Seal 12/22/2025 71 CTTNWDWS COTTONWOOD RD W/S 01 HICKORY END CDS R AC 2 352 33 3/31/2023 Slurry Seal 12/22/2025 69 CUMBECI CUMBERLAND CIRCLE 01 KINGSPORT DR JEFFERSON ST R AC 2 1,075 33 10/1/2013 Cape Seal 12/4/2025 70 CUMBECI CUMBERLAND CIRCLE 02 JEFFERSON ST END CDS R AC 2 669 33 11/1/2012 AC Overlay 12/4/2025 76 DAISY DAISY CIRCLE 01 CAMINO DE BRYANT END CDS R AC 2 100 28 7/1/2016 Slurry Seal 10/19/2023 91 DAPLEGRYLN DAPPLE GRAY LN 01 STEEPLECHASE WY SHETLAND LN R AC 2 374 32 10/2/2018 Slurry Seal 11/19/2025 93 DBGLI D BAGLIO WAY 01 GRANBY DR END CDS R AC 2 613 35 10/2/2023 Slurry Seal 12/6/2025 87 DEBLN DEBI LN 01 EUREKA LN END CDS R AC 2 623 33 10/1/2019 Slurry Seal 11/1/2025 73 DEDR DEODAR DR 01 VILLAGE CENTER DR END CDS R AC/AC 2 2,178 33 10/1/2023 AC Overlay 12/6/2025 96 DEERFTLNE DEERFOOT LANE 01 ARROYO CAJON END CDS R AC 2 228 33 1/24/2022 Slurry Seal 12/17/2025 70 DELALNANS VIA DE LA LUNA N/S 01 AVENIDA PUESTA DEL SOL END CDS R AC 2 748 33 10/1/2019 Slurry Seal 2/9/2026 80 DELALNASS VIA DE LA LUNA S/S 01 AVENIDA PUESTA DEL SOL END CDS R AC 2 438 33 10/1/2019 Slurry Seal 11/12/2025 81 DELAMLA VIA DE LA MULA 01 VIA DON QUIJOTE VIA DON JUAN R AC 2 561 33 7/1/2016 Slurry Seal 2/2/2026 57 DELAPLZA VIA DE LA PLAZA N/S 01 AVENIDA DEL RAY END CDS R AC 2 481 33 10/1/2019 Slurry Seal 11/12/2025 62 DELAPLZASS VIA DE LA PLAZA S/S 01 AVENIDA DEL RAY END CDS R AC 2 734 33 10/1/2019 Slurry Seal 1/16/2026 83 DELCONEJO VIA DEL CONEJO 01 VIA DEL CAZADOR VIA DEL COYOTE R AC/AC 2 750 34 3/31/2023 AC Overlay 12/18/2025 100 DELGNDRO VIA DEL GANADERO 01 AVENIDA DEL NORTE END CDS R AC 2 367 33 10/1/2019 Slurry Seal 11/12/2025 70 DELOBSPO VIA DEL OBISPO 01 VIA TRINIDAD END OF CDS R AC 2 202 33 7/1/2016 Slurry Seal 12/18/2025 57 DELOSMNTNS VIA DE LAS MONTANAS 01 AVENIDA DE LAS FLORES END CDS R AC 2 55 27 10/1/2019 Slurry Seal 11/14/2025 70 DELOSRBLS VIA DE LOS ROBLES 01 AVENIDA DEL NORTE END CDS R AC 2 404 33 10/1/2019 Slurry Seal 11/12/2025 70 DELOSRYS AVENIDA DE LOS REYES 01 VIA VENTANA END CDS R AC 2 1,000 33 3/31/2023 Slurry Seal 12/6/2025 80 DELSFLRES AVENIDA DE LAS FLORES 01 PUESTA DEL SOL 345'' N OF PUESTA DEL SOL R AC 2 345 36 10/1/2019 Slurry Seal 11/12/2025 53 DELSFLRES AVENIDA DE LAS FLORES 02 345 N OF PUESTA DEL SOL AVENIDA DEL NORTE R AC 2 2,364 36 10/1/2019 Slurry Seal 11/12/2025 60 DIAMONHIL DIAMOND HILL 01 SPYGLASS HILL OYSTER BAY R AC 2 245 33 10/2/2018 Slurry Seal 11/19/2025 70 DLBUY VIA DL BUEY 01 VIA LA MANCHA END OF STREET R AC 2 1,600 33 7/1/2016 Slurry Seal 2/2/2026 51 DLCRX DELACROIX WAY 01 CAMINO DE BRYANT PICASSO DR R AC 2 1,125 33 7/1/2016 Slurry Seal 10/10/2023 86 DLESTE AVENIDA DEL ESTE 01 PUESTA DEL SOL AVENIDA RIO DEL ORO R AC 2 2,078 30 10/1/2019 Slurry Seal 11/12/2025 73 DLNRTE AVENIDA DEL NORTE 01 AVENIDA DE LAS FLORES VIA ALEGRE R AC 2 799 36 10/1/2019 Slurry Seal 11/12/2025 70 DLNRTE AVENIDA DEL NORTE 02 VIA ALEGRE AVENIDA RIO DEL ORO R AC 2 266 36 10/1/2019 Slurry Seal 11/12/2025 81 DLPLMR VIA DEL PALMAR 01 VIA BRUMOSA VIA MARWAH E/S R AC 2 267 33 3/31/2023 Slurry Seal 12/5/2025 72 DLPLMR VIA DEL PALMAR 02 VIA MARWAH W/S VIA PRIMARIA R AC 2 515 33 3/31/2023 Slurry Seal 1/29/2026 61 DLPRDO VIA DEL PRADO N/S 01 AVENIDA DEL REY END CDS R AC 2 556 33 10/1/2019 Slurry Seal 11/12/2025 59 DLPRDOSS VIA DEL PRADO S/S 01 AVENIDA DEL REY END CDS R AC 2 686 33 10/1/2019 Slurry Seal 11/12/2025 60 DLRNCHO VIA DEL RANCHO 01 PUESTA DEL SOL END CDS R AC 2 537 33 10/1/2019 Slurry Seal 11/12/2025 83 DLRY AVENIDA DEL REY 01 AVENIDA RIO DEL ORO VIA DE LA PLAZA R AC 2 462 54 10/1/2019 Slurry Seal 2/9/2026 46 DLRY AVENIDA DEL REY 02 VIA DE LA PLAZA AVENIDA DE LAS FLORES R AC 2 489 33 10/1/2019 Slurry Seal 11/12/2025 59 A - Arterials, C - Collectors, O - Alleyways, R - Residentials, U - Urban Principal Arterials AC - Asphalt Concrete, AC/AC - Asphalt Concrete Overlay of existing Asphalt Concrete, ST - Surface Treatment Page 870 of 1224 6 of 25 4/29/2026 City of Yorba Linda
2026 Pavement Management Program Update
Section Description Inventory
Local Network
Sorted by Name
Street ID Street Name
Section
ID Beg Location End Location Functional Class
Surface
Type
# Lanes Length
(LF)
Width
(LF) Last Treatment Date Last Treatment PCI Date PCI
DLRY AVENIDA DEL REY 03 FAIRMONT BLVD AVENIDA DE LAS FLORES R AC/AC 2 177 27 10/1/2019 Slurry Seal 11/12/2025 34 DLSARBLS AVENIDA DE LOS ARBOLES 01 YORBA LINDA BLVD VIA ROJA R AC 2 169 33 10/2/2023 Slurry Seal 12/3/2025 77 DLVALLE VIA DEL VALLE 01 AVENIDA DEL ESTE END CDS R AC 2 894 36 7/1/2009 Slurry Seal 11/12/2025 78 DNJUAN VIA DON JUAN 01 VIA DE LA MULA VIA DEL BUEY R AC 2 489 33 7/1/2016 Slurry Seal 2/2/2026 58 DNQUJOTE VIA DON QUIJOTE 01 VIA DEL BUEY VIA DE LA MULA R AC 2 377 33 7/1/2016 Slurry Seal 2/2/2026 30 DNRBN DUNROBIN WAY 01 STONEHAVEN DR END OF CDS R AC 2 1,707 37 7/1/2024 Crack Seal + Slurry Seal 2/3/2026 99 DNSMURPLZA DUNSMUR PLAZA 01 OAKMEADOW DR END CDS R AC 2 564 33 1/24/2022 Slurry Seal 12/12/2025 81 DNVR DENVER AVE 01 BASTANCHURY RD BROOKLYN AVE R AC 2 1,137 33 10/2/2018 Slurry Seal 11/7/2025 87 DOMRNCH DOMINGUEZ RANCH ROAD 01 TRAILSIDE DRIVE YORBA RANCH ROAD R AC/AC 2 3,940 34 10/1/2023 AC Overlay 12/17/2025 96 DOMRNCHRD DOMINGUEZ RANCH ROAD 01 TRAILSIDE DRIVE ESPERANZA ROAD R AC/AC 2 2,300 34 10/1/2023 AC Overlay 12/17/2025 99 DORST DORTHEA ST 01 LA CASITAS AVE CITY LIMIT R AC 2 1,610 33 10/1/2019 Slurry Seal 11/17/2025 72 DRAKST DRAKE ST 01 496'' W/O VALLEY VIEW CIR END CDS R AC 2 859 27 10/2/2018 Slurry Seal 2/6/2026 84 DRAST DRAKE ST 01 VALLEY VIEW CIR 496'' W/O VALLEY VIEW CIR R AC 2 496 33 10/2/2018 Slurry Seal 11/4/2025 85 DRLCRT DORAL CT 01 WAGON WHEEL END CDS R AC/AC 2 88 33 1/20/2022 AC Overlay 2/9/2026 82 DRNDA DORINDA RD 01 END OF CDS FELIPA RD R AC/AC 2 1,597 33 10/1/2023 AC Overlay 12/3/2025 89 DRNDA DORINDA RD 02 FELIPA RD YORBA LINDA BLVD R AC/AC 2 1,022 33 10/1/2023 AC Overlay 12/3/2025 99 DUNMURLN DUNMURRY LN 01 LAKEVIEW AVE JOEL BRATTAIN DR R AC 2 210 37 10/2/2018 Slurry Seal 11/19/2025 66 DURHDR DURHAM DR 01 RUTLAND DR WESTMORELAND DR R AC 2 411 33 10/1/2013 Cape Seal 12/4/2025 70 DVNPRT DEVENPORT 01 STONEHAVEN END CDS R AC 2 271 33 7/1/2024 Crack Seal + Slurry Seal 12/3/2025 79 DVRON DEVERON COVE 01 AVIEMORE DR END OF CDS R AC 2 1,136 33 7/1/2024 Crack Seal + Slurry Seal 12/3/2025 89 E/BESTPRK EASTPARK DRIVE 01 OLD CANAL ROAD 1000'' E/O OLD CANAL RD. C AC 2 1,000 48 7/1/2016 Slurry Seal 10/19/2023 60 ECLYPTSHLL EUCALYPTUS HILL RD 01 END OF CDS END OF ROAD R AC/AC 2 276 33 3/27/2021 AC Overlay 12/17/2025 90 EDGEWLN EDGEWOOD LN 01 VALLEY VIEW CIR 700'' E/O VALLEY VIEW CIR R AC 2 700 33 10/2/2018 Slurry Seal 11/3/2025 79 EDGEWLN EDGEWOOD LN 02 700'' E/O VALLEY VIEW CIR END CDS R AC 2 530 33 10/2/2018 Slurry Seal 11/3/2025 67 EGLESNST EAGLES NEST DR 01 FAIRMONT BLVD END CDS R AC/AC 2 847 33 10/1/2023 AC Overlay 12/2/2025 98 ELCAJAV EL CAJON AVE 01 PROSPECT AVE LA PAZ AVE R AC 2 1,050 33 10/2/2018 Slurry Seal 11/5/2025 76 ELCAJAV EL CAJON AVE 02 LA PAZ AVE RUSTIC AVE R AC 2 1,145 33 10/2/2018 Slurry Seal 11/5/2025 75 ELCAJAV EL CAJON AVE 03 RUSTIC AVE VALLEY VIEW AVE R AC 2 504 33 10/2/2018 Slurry Seal 11/5/2025 74 ELCAJAV EL CAJON AVE 04 ROSE DR MIMOSA DR R AC 2 540 33 10/2/2018 Slurry Seal 11/6/2025 78 ELCAJAV EL CAJON AVE 05 MIMOSA DR VISTA RANCH R AC 2 287 33 10/2/2018 Slurry Seal 11/6/2025 73 ELCD AVENIDA EL CID 01 PASEO DE LAS PALOMAS VIA AUGUSTO R AC/AC 2 1,983 33 3/31/2023 Slurry Seal 1/29/2026 79 ELDRBRRYWY ELDERBERRY LANE 01 BLACKBERRY WAY END OF CDS R AC 2 224 33 7/1/2016 Slurry Seal 10/11/2023 66 ELKMTN ELK MTN DR 01 SMOKEY MTN CAMINO DE BRYANT R AC 2 2,292 33 7/1/2025 Crack Seal + Slurry Seal + MM + LI + BR 10/10/2023 74 ELMHURCI ELMHURST CIRCLE 01 CASA LOMA AVE END CDS R AC 2 589 33 10/1/2019 Slurry Seal 11/5/2025 80 ELMLINONS VIA EL MOLINO N/S 01 AVENIDA DEL RAY END CDS R AC 2 582 33 10/1/2019 Slurry Seal 11/12/2025 72 ELMLINOSS VIA EL MOLINO S/S 01 AVENIDA DEL RAY END CDS R AC 2 522 33 10/1/2019 Slurry Seal 11/12/2025 46 ERLYSTRWY EARLY STAR WAY 01 EVENING BREEZE DR END OF CDS R AC/AC 2 320 33 7/1/2024 AC Overlay 10/11/2023 100 ERNSTJHSN ERNEST JOHNSON 01 JOHN BIXBY END OF CDS R AC 2 248 33 7/1/2016 Slurry Seal 10/10/2023 71 ESTHLLDR EAST HILL DR 01 VILLAGE CENTER SOUTH VIEW DR R AC 2 387 33 3/31/2023 Slurry Seal 1/29/2026 54 ESTSDCIR EAST SIDE CIRCLE 01 ESPARANZA RD END OF CDS R AC 2 1,501 37 10/2/2023 Slurry Seal 12/3/2025 83 EURAVE EUREKA AVENUE 01 YORBA LINDA BLVD. S END R AC/AC 2 770 25 3/27/2021 AC Overlay 12/9/2025 96 EURKA EUREKA AVENUE 03 IMPERIAL HWY YORBA LINDA BLVD R AC 2 1,741 36 10/1/2019 Slurry Seal 11/20/2025 64 EVERGRNAV EVERGREEN AVE 01 CITRIO DORA AVE CEDAR AVE R AC 2 309 34 10/1/2019 Slurry Seal 11/18/2025 77 EVNGBRZSS EVENING BREEZE DR S/S 01 BRUSH CANYON DR END OF CDS R AC/AC 2 2,155 33 7/1/2024 AC Overlay 10/11/2023 100 FALABELN FALABELLA LN 01 OLDENBURG LN CDS R AC 2 483 32 10/2/2018 Slurry Seal 11/19/2025 95 FALLLFRD FALLEN LEAF ROAD 01 SINGINGWOOD DRIVE E END CDS R AC 2 365 33 10/2/2023 Slurry Seal 2/2/2026 42 FLCIA FELICIA DR 01 AVENIDA RIO DEL ORO LUPINE ST R AC/AC 2 1,970 33 1/20/2022 AC Overlay 1/8/2026 90 FLCNRDGE FALCONRIDGE RD 01 RIM CREST DR END CDS R AC/AC 2 229 33 12/1/2022 2" Grind & Cap 12/2/2025 94 A - Arterials, C - Collectors, O - Alleyways, R - Residentials, U - Urban Principal Arterials AC - Asphalt Concrete, AC/AC - Asphalt Concrete Overlay of existing Asphalt Concrete, ST - Surface Treatment Page 871 of 1224 7 of 25 4/29/2026 City of Yorba Linda
2026 Pavement Management Program Update
Section Description Inventory
Local Network
Sorted by Name
Street ID Street Name
Section
ID Beg Location End Location Functional Class
Surface
Type
# Lanes Length
(LF)
Width
(LF) Last Treatment Date Last Treatment PCI Date PCI
FLORRD FLORENCE RD 01 CORTONA CT CDS R AC 2 835 33 N/A N/A 11/13/2025 95 FLPARD FELIPA RD 01 DORINDA RD SAN ANTONIO RD R AC/AC 2 1,286 33 10/1/2023 AC Overlay 12/3/2025 94 FLRADR FLORA DR 01 LAKEVIEW DR END OF CDS R AC 2 1,038 33 5/28/2021 Slurry Seal 2/9/2026 58 FOLDR FOLEY DR 01 SANTA FE ST END R AC 2 460 33 10/2/2018 Slurry Seal 11/7/2025 76 FOLDR FOLEY DR 02 SANTA FE ST BRIARHILL DR R AC 2 490 33 10/2/2018 Slurry Seal 11/7/2025 62 FOUST FOURTH ST 01 MARDA AVE BROOKLYN AVE R AC 2 284 33 10/2/2018 Slurry Seal 11/4/2025 66 FOXTL FOXTAIL DR 01 LOTUS AVE VIA LOMAS DE YORBA R AC 2 1,652 33 7/1/2016 Slurry Seal 10/6/2023 67 FRCRST FIR CREST DR 01 TAMMARISK DR PEBBLE BEACH LANE R AC/AC 2 230 33 3/27/2021 AC Overlay 12/8/2025 96 FREMONT FREMONT LN 01 CARSON WAY END CDS R AC 2 780 33 N/A N/A 11/3/2025 93 FRLYNNBLVD FAIRLYNN BLVD 01 BROOKMONT DR CRESTKNOLL R AC 2 819 37 1/24/2022 Slurry Seal 12/17/2025 88 FRMNTBLVD FAIRMONT BLVD 04 SAN ANTONIO EAGLES NEST S/S C AC 2 1,970 37 10/2/2023 Slurry Seal 2/2/2026 72 FRMNTBLVD FAIRMONT BLVD 05 EAGLES NEST S/S SHADOW OAK S/S C AC 2 1,969 37 10/2/2023 Slurry Seal 12/2/2025 77 FRMNTBLVD FAIRMONT BLVD 06 SHADOW OAK VILLAGE CENTER S/S C AC 2 705 37 10/2/2023 Slurry Seal 12/2/2025 89 FRMNTBLVD FAIRMONT BLVD 08 FOREST S/S VILLAGE CENTER C AC 5 1,735 60 10/2/2023 Slurry Seal 12/2/2025 81 FRNCECRK FURNACE CREEK RD 01 WALNUT CREEK RD FAIRMONT BLVD R AC 2 1,306 33 1/24/2022 Slurry Seal 12/17/2025 77 FRNCIR FERN CIR 01 SMOKETREE AVE END CDS R AC 2 354 27 10/2/2023 Slurry Seal 12/1/2025 82 FRNDSA VIA FRONDOSA S/S 01 AVENIDA PUESTA DEL SOL END CDS R AC 2 202 33 7/1/2009 Slurry Seal 11/12/2025 77 FRNDSANS VIA FRONDOSA N/S 01 AVENIDA PUESTA DEL SOL END CDS R AC 2 604 33 7/1/2009 Slurry Seal 11/12/2025 78 FRNGLNDR FERN GLEN DR 01 AMBERDALE DR CANYON DR R AC 2 1,785 33 1/24/2022 Slurry Seal 12/12/2025 80 FRNWDPLZA FERNWOOD PLAZA 01 OAK MEADOW DR END CDS R AC 2 550 33 1/24/2022 Slurry Seal 12/12/2025 80 FRST FOREST AVE 01 FAIRMONT BLVD END CDS R AC/AC 2 432 33 12/1/2022 2" Grind & Cap 12/2/2025 97 FRSTGLN FOREST GLEN RD 01 RIM CREST DR END CDS R AC/AC 2 728 29 12/1/2022 2" Grind & Cap 12/2/2025 95 FRWDCIR FAIRWOOD CIRLCE 01 HIDDEN HILLS RD END OF CDS R AC 2 520 33 10/2/2023 Slurry Seal 12/3/2025 71 FRWYVW FAIRWAY VIEW 01 END OF CDS END OF CDS O AC 2 803 33 5/28/2021 Slurry Seal 12/22/2025 84 FTHER FEATHER AVE 01 GRANDBY CIR ROANOKE AVE R AC 2 1,458 27 10/2/2023 Slurry Seal 12/6/2025 91 FTHRGRSSLN FEATHER GRASS LANE 01 BRUSH CANYON DR END OF CDS R AC/AC 2 544 33 7/1/2024 AC Overlay 10/11/2023 100 FTRADR FUTURA DR 01 FAIRMONT BLVD END CDS R AC/AC 2 621 33 1/20/2022 AC Overlay 1/8/2026 89 FXFLD FOX FIELD LN 01 ARROYO CAJON DR PARKSIDE DR R AC 2 1,132 33 1/24/2022 Slurry Seal 12/17/2025 72 FXHLLW FOX HOLLOW DR 01 SHADOW OAK DR FAIRMONT BLVD R AC/AC 2 795 33 10/1/2023 AC Overlay 12/2/2025 98 GALBAYRD GALWAY BAY RD 01 REDCASTLE ST JOEL BRATTAIN DR R AC 2 430 33 10/2/2018 Slurry Seal 11/19/2025 64 GALLALWY GALLAL WAY 01 CHANDLER DRIVE THAGARD WAY R AC 2 785 33 3/31/2023 Slurry Seal 12/17/2025 90 GARDLN GARDENIA LN 01 JASMINE WY SOUTH CDS R AC 2 1,730 32 10/2/2018 Slurry Seal 11/3/2025 87 GARDLN GARDENIA LN 02 JASMINE WY NORTH CDS R AC 2 698 32 10/2/2018 Slurry Seal 11/3/2025 84 GARDPL GARDEN PL 01 IMPERIAL HWY END CDS R AC 2 587 27 10/1/2019 Slurry Seal 2/3/2026 100 GENOWY GENOA WY 01 CHIANTI CT CDS R AC 2 1,862 33 N/A N/A 11/13/2025 89 GLASGCI GLASGOW CIRCLE 01 VAN BUREN ST END CDS R AC 2 263 33 5/28/2021 Slurry Seal 12/9/2025 97 GLNDLEDR GLENDALE DR 01 LARKRIDGE DR CRESTKNOLL DR R AC 2 805 36 1/24/2022 Slurry Seal 12/17/2025 78 GLNHVN GLEN HAVEN DR 01 FERNGLEN DR FAIRMONT BLVD R AC 2 1,043 33 1/24/2022 Slurry Seal 12/17/2025 82 GLNPL GLEN PL 01 FERNGLEN DR END CDS R AC 2 225 33 1/24/2022 Slurry Seal 12/12/2025 80 GLRMRA GLARAMARA CIR 01 CAMINO DE BRYANT END CDS R AC 2 100 33 7/1/2025 Crack Seal + Slurry Seal + MM + LI + BR 10/19/2023 79 GLXNANS GLOXINIA DR N/S 01 JACARANDA LN END CDS R AC/AC 2 595 33 10/1/2023 AC Overlay 12/18/2025 89 GLXNASS GLOXINIA DR S/S 01 JACARANDA LN BEGONIA DR R AC/AC 2 870 33 10/1/2023 AC Overlay 12/18/2025 93 GOLDAV GOLDEN AVE 01 ROSE DR 472'' W/O ROSE DR R AC 2 472 60 10/2/2018 ARHM Overlay 10/30/2025 84 GOLDAV GOLDEN AVE 02 472'' W/O ROSE DR E/S OF BRIDGE R AC 2 602 40 10/2/2018 ARHM Overlay 10/30/2025 80 GOLDWILCT GOLDEN WILLOW CT 01 BLUE SPRUCE LN CDS R AC 2 103 33 10/2/2018 Slurry Seal 11/3/2025 85 GOLMAPLN GOLDEN MAPLE LN 01 SUGAR PINE DR SCOTCH PINE RIDGE R AC 2 549 33 5/28/2021 Slurry Seal 12/3/2025 80 GOLPOPWY GOLDEN POPPY WY 01 BRAMBLE CT CDS R AC 2 687 33 10/2/2018 Slurry Seal 11/3/2025 87 GRDN GORDON LN 01 GRANDVIEW AVE END OF CDS R AC 2 498 37 5/28/2021 Slurry Seal 12/8/2025 90 A - Arterials, C - Collectors, O - Alleyways, R - Residentials, U - Urban Principal Arterials AC - Asphalt Concrete, AC/AC - Asphalt Concrete Overlay of existing Asphalt Concrete, ST - Surface Treatment Page 872 of 1224 8 of 25 4/29/2026 City of Yorba Linda
2026 Pavement Management Program Update
Section Description Inventory
Local Network
Sorted by Name
Street ID Street Name
Section
ID Beg Location End Location Functional Class
Surface
Type
# Lanes Length
(LF)
Width
(LF) Last Treatment Date Last Treatment PCI Date PCI
GRENPIWY GREEN PINE WAY 01 SUGAR PINE DR TORREY PINE PL R AC/AC 2 591 33 3/27/2021 AC Overlay 12/3/2025 97 GRENWICI GREENWICH CIRCLE 01 CARRAIGE CIR END CDS R AC 2 616 33 10/1/2013 Cape Seal 12/4/2025 58 GRNBY GRANBY DR 01 END CDS AVENIDA ADOBE AVE R AC 2 1,790 35 10/2/2023 Slurry Seal 12/6/2025 83 GRNCRST GREEN CREST E/S 01 SKY RIDGE END OF CDS R AC/AC 2 1,173 26 10/1/2023 AC Overlay 12/3/2025 100 GRNCRSTWS GREEN CREST W/S 01 SKY RIDGE HIDDEN HILLS R AC/AC 2 2,173 28 10/1/2023 AC Overlay 12/3/2025 96 GRNDA GRANADA DR 01 SIENNA LN LOMBARDY LN R AC/AC 2 700 36 3/30/2023 AC Overlay 11/13/2025 96 GRNDA GRANADA DR 02 LA TIERRA LN END CDS R AC/AC 2 392 33 7/1/2019 AC Overlay 11/13/2025 94 GRNDVWAVE GRAND VIEW AVE 01 MOUNTAIN VIEW AVE BUENA VISTA AVE R AC 2 700 37 10/1/2013 Slurry Seal 12/8/2025 69 GRNDVWAVE GRAND VIEW AVE 02 BUENA VISTA AVE LINDA VERDE ST R AC 2 632 27 5/28/2021 Slurry Seal 12/8/2025 77 GRNDVWAVE GRAND VIEW AVE 03 LINDA VERDE ST KELLOGG DR R AC 2 2,139 27 5/28/2021 Slurry Seal 12/8/2025 73 GRNDVWAVE GRAND VIEW AVE 04 MOUNTIAN VIEW AVE GORDON LN R AC/AC 2 1,154 33 5/28/2021 Slurry Seal 12/8/2025 94 GRNDVWAVE GRAND VIEW AVE 05 GORDON LN DEE LN R AC 2 332 33 10/1/2013 Slurry Seal 12/8/2025 97 GRNHLLWLN GREEN HOLLOW LN 01 BRUSH CANYON DR END OF CDS R AC 2 323 33 7/1/2024 Crack Seal + Slurry Seal + MM + LI + BR 10/11/2023 74 GRNHVN GREENHAVEN ST 01 DEVERON COVE AVIEMORE DR R AC 2 1,054 37 7/1/2024 Crack Seal + Slurry Seal 2/11/2026 58 GRNLFPLZA GREEN LEAF PLAZA 01 OAK MEADOW DR END CDS R AC 2 542 33 1/24/2022 Slurry Seal 12/12/2025 77 GRNMDWWY GREEN MEADOW WAY 01 MEADOWLAND LANE END OF CDS R AC 2 653 33 7/1/2016 Slurry Seal 10/11/2023 61 GRNMNT GREEN MOUNT PL 01 HIDDEN HILLS END OF CDS R AC/AC 2 627 26 10/2/2023 Slurry Seal 1/30/2026 61 GROWCIR GROWERS CIRCLE 01 END CDS END CDS R AC 2 580 33 5/28/2021 Slurry Seal 12/9/2025 76 GRSTODR GREY STONE DR 01 BASTANCHURY RD END CDS R AC 2 444 33 10/2/2018 Slurry Seal 2/11/2026 35 HARLDR HARLAN DR 01 VINDWOOD LN END CDS R AC 2 400 33 10/2/2018 Slurry Seal 11/3/2025 84 HARVWY HARVEST WAY 01 END CDS END CDS R AC 2 816 33 5/28/2021 Slurry Seal 12/9/2025 72 HBSCS HIBISCUS CIR 01 FELICIA DR END CDS R AC 2 61 27 1/24/2022 Slurry Seal 1/8/2026 70 HCKRY HICKORY DR 01 ESPERANZA END CDS R AC 2 374 33 3/31/2023 Slurry Seal 12/22/2025 69 HCKRYTREE HICKORY TREE LN 01 VIEW PARK DR END CDS R AC 2 426 37 10/2/2023 Slurry Seal 12/22/2025 87 HDDNGLN HIDDEN GLEN LN 01 HIDDEN HILLS RD END OF CDS R AC 2 264 26 10/2/2023 Slurry Seal 12/3/2025 82 HDDNHLLRD HIDDEN HILLS RD 01 ENT/HIDDEN HILLS EST MISSION HILLS R AC 1 2,425 26 10/2/2023 Slurry Seal 12/3/2025 83 HDDNHLLRD HIDDEN HILLS RD 02 MISSION HILLS HIDDEN HILLS ESTATES S/B R AC 1 2,425 26 10/2/2023 Slurry Seal 1/30/2026 86 HDDNHLLRD HIDDEN HILLS RD 03 MISSION HILLS STONE WOOD R AC 2 1,749 37 10/2/2023 Slurry Seal 12/3/2025 92 HDDNHLLRD HIDDEN HILLS RD 04 STONEWOOD CUL DE SAC- END R AC 2 1,257 37 10/2/2023 Slurry Seal 12/3/2025 91 HDDNHLLRD HIDDEN HILLS RD 05 CDS HIGH TREE R AC/AC 2 1,581 39 10/2/2023 Slurry Seal 1/30/2026 51 HDDNHLLRD HIDDEN HILLS RD 06 HIGHTREE CIR GREEN CREST N/S R AC/AC 2 1,704 36 10/2/2023 Slurry Seal 1/30/2026 49 HDDNHLLRD HIDDEN HILLS RD 07 GREEN CREST END R AC 2 1,220 36 10/2/2023 Slurry Seal 1/30/2026 53 HEIDI HEIDI CIRCLE 01 CASA LOMA AVE END CDS R AC 2 633 33 10/1/2019 Slurry Seal 11/5/2025 74 HEIDICIR HEIDI CIRCLE 01 HEIDI CIRCLE S S END CDS R AC 2 25 33 10/1/2019 Slurry Seal 11/5/2025 70 HGHTR HIGH TREE CIR 01 HIDDEN HILLS END OF CDS R AC/AC 2 639 26 10/2/2023 Slurry Seal 1/30/2026 51 HIGHAV HIGHLAND AVE 01 MOUNTAIN VIEW AVE END R AC 2 1,238 24 5/28/2021 Slurry Seal 12/9/2025 83 HIGHAV HIGHLAND AVE 02 BUENA VISTA AVE MARIPOSA AVE R AC 2 2,980 30 5/28/2021 Slurry Seal 12/10/2025 73 HIGHAV HIGHLAND AVE 03 BUENA VISTA AVE LONG VIEW DR R AC 2 1,027 36 5/28/2021 Slurry Seal 12/10/2025 76 HIGHAV HIGHLAND AVE 04 LONG VIEW DR END CDS R AC 2 238 36 7/1/2004 Slurry Seal 12/10/2025 76 HILLCRECI HILLCREST CIRCLE 01 PROSPECT AVE END CDS R AC 2 378 33 10/2/2018 Slurry Seal 11/6/2025 79 HILWODPL HILLWOOD PL 01 VAN BUREN ST END CDS R AC 2 173 33 5/28/2021 Slurry Seal 12/3/2025 97 HILWODR HILLWOOD DR 01 BRIARHILL DR VAN BUREN ST R AC 2 484 33 5/28/2021 Slurry Seal 12/3/2025 79 HILWODR HILLWOOD DR 02 JEFFERSON ST END CDS R AC/AC 2 275 37 3/27/2021 AC Overlay 12/3/2025 96 HLLCKVW HILLCOCK VIEW PLAZA 01 RIDGEWOOD PL END CDS R AC 2 668 33 1/24/2022 Slurry Seal 12/12/2025 79 HLLSD HILLSIDE DR 01 CANYON DR RIVERVIEW DR R AC 2 969 33 1/24/2022 Slurry Seal 12/17/2025 73 HLLTP HILLTOP PL 01 HILLSIDE DR END CDS R AC 2 200 33 1/24/2022 Slurry Seal 12/17/2025 84 HLLYBRRYLN HOLLY BERRY LANE 01 MULBERRY LANE END OF CDS R AC 2 280 33 7/1/2016 Slurry Seal 10/11/2023 76 HNNH HANNAH CIR 01 VIA MARWAH END CDS R AC 2 221 27 3/31/2023 Slurry Seal 1/29/2026 51 A - Arterials, C - Collectors, O - Alleyways, R - Residentials, U - Urban Principal Arterials AC - Asphalt Concrete, AC/AC - Asphalt Concrete Overlay of existing Asphalt Concrete, ST - Surface Treatment Page 873 of 1224 9 of 25 4/29/2026 City of Yorba Linda
2026 Pavement Management Program Update
Section Description Inventory
Local Network
Sorted by Name
Street ID Street Name
Section
ID Beg Location End Location Functional Class
Surface
Type
# Lanes Length
(LF)
Width
(LF) Last Treatment Date Last Treatment PCI Date PCI
HOGADR HOGAN DR 01 LAKEVIEW AVE CDS R AC 2 728 33 10/2/2018 Slurry Seal 11/18/2025 70 HOLLY HOLLY CIRCLE 01 HIGHLAND AVE END CDS R AC 2 380 33 11/1/2012 AC Overlay 12/15/2025 84 HOMSTAV HOMESTEAD AVE 01 LAKEVIEW AVE SPYGLASS HILL R AC 2 301 37 10/2/2018 Slurry Seal 11/19/2025 68 HOOSLAWY HOOSIER LAWN WY 01 OAKLAWN LN CDS R AC 2 754 33 10/2/2018 Slurry Seal 11/17/2025 84 HRBSY HERBSHEY CIR 01 LINDSEY CIR END CDS R AC 2 960 33 3/31/2023 Slurry Seal 12/6/2025 87 HTHR HEATHER WAY 01 HIGHLAND AVE LAKEVIEW AVE R AC 2 1,082 33 5/28/2021 Slurry Seal 12/15/2025 74 HTHRDGE HEATHERIDGE DR 01 STONEHAVEN DR HEATHRIDGE DR R AC 2 2,455 31 7/1/2024 Crack Seal + Slurry Seal 2/11/2026 66 HTHRWD HEATHERWOOD LN 01 DEVERON COVE GREEN HAVEN ST R AC 2 759 37 7/1/2024 Crack Seal + Slurry Seal 12/3/2025 93 HUGGAV HUGGINS AVE 01 ROSE DR JEANEAN LN R AC 2 660 33 10/2/2018 Slurry Seal 11/6/2025 84 HUMBTLN HUMBOLDT LN 01 BASTANCHURY RD CDS R AC 2 1,195 33 10/2/2018 Slurry Seal 11/13/2025 71 IRBKWY IRONBARK WY 01 LINDEN WY SWEET BAY CT R AC 2 300 33 10/2/2018 Slurry Seal 11/3/2025 81 IRNSTNE IRON STONE DR 01 CAMINO DE BRYANT END CDS R AC 2 454 28 7/1/2025 Crack Seal + Slurry Seal + MM + LI + BR 10/19/2023 86 IVYCRCLE IVY CIRCLE 01 GLOXINIA DR END CDS R AC/AC 2 118 33 10/1/2023 AC Overlay 1/29/2026 95 JASMNWY JASMINE WY 01 GARDENIA LN PRIMROSE LN R AC 2 503 33 10/2/2018 Slurry Seal 11/3/2025 92 JAYST JAY ST 01 CALGARY AVE KENNON DR R AC 2 302 33 5/28/2021 Slurry Seal 12/9/2025 97 JAYST JAY ST 02 RIDGECREST DR SONOMA WAY R AC 2 327 33 5/28/2021 Slurry Seal 12/15/2025 97 JCRNDA JACARANDA LN 01 BEGONIA DR YORBA RANCH RD R AC 2 1,321 33 10/2/2023 Slurry Seal 1/29/2026 65 JEANLN JEANEAN LN 01 END CDS END R AC 2 764 33 10/2/2018 Slurry Seal 11/6/2025 79 JEFDR JEFFERY DR 01 JENNIFER DR END CDS R AC 2 212 33 10/2/2018 Slurry Seal 11/7/2025 78 JEFFST JEFFERSON ST 01 YORBA LINDA BLVD CITY LIMIT R AC/AC 2 1,000 37 3/27/2021 AC Overlay 12/3/2025 97 JEFFST JEFFERSON ST 02 CITY LIMIT BUENA VISTA AVE R AC 2 1,014 37 11/1/2012 AC Overlay 12/4/2025 70 JENDR JENNIFER DR 01 LA CONCETTA DR JEFFERY DR R AC 2 243 33 10/2/2018 Slurry Seal 11/7/2025 62 JENDR JENNIFER DR 02 LA CONCETTA DR VALLEY VIEW R AC 2 201 33 10/2/2018 Slurry Seal 11/7/2025 69 JHNBXBY JOHN BIXBY 01 RANCHO SANTA ANA ERNEST JOHNSON R AC 2 230 33 7/1/2016 Slurry Seal 10/10/2023 85 JNIPER JUNIPER AVE 01 DEODAR DR END CDS R AC/AC 2 1,112 33 10/1/2023 AC Overlay 2/2/2026 68 JOANWY JOANNE WAY 01 CALLE SONORA END CDS R AC/AC 2 150 33 3/31/2023 AC Overlay 2/11/2026 83 JOELBRDR JOEL BRATTAIN DR 01 W CDS E CDS R AC 2 2,026 37 10/2/2018 Slurry Seal 11/18/2025 76 JOSHDR JOSHUA DR 01 EUREKA AVE END CDS R AC 2 693 33 10/1/2019 Slurry Seal 1/16/2026 63 JSTN JUSTIN WAY 01 VIA MARWAH END CDS R AC 2 412 33 3/31/2023 Slurry Seal 12/5/2025 87 JUTLNDLN JUTLAND LN 01 MORGAN CT CDS R AC 2 1,026 32 10/2/2018 Slurry Seal 11/19/2025 83 KAYLN KAYE LN 01 MOLLIE LN CARI LN R AC 2 934 33 10/1/2019 Slurry Seal 11/11/2025 73 KDKMNTN KODIAK MOUNTAIN DR 01 CAMINO DE BRYANT MT. TRUMPH S/S R AC 2 3,057 33 7/1/2025 Crack Seal + Slurry Seal + MM + LI + BR 10/19/2023 91 KDKMNTN KODIAK MOUNTAIN DR 02 MT. TRUMPH S/S CAMINO DE BRYANT R AC 2 1,581 33 7/1/2025 Crack Seal + Slurry Seal + MM + LI + BR 10/19/2023 93 KILLYMOCIR KILLYMOON CIR 01 LAKEVIEW AVE JOEL BRATTAIN DR R AC 2 396 37 10/2/2018 Slurry Seal 11/19/2025 76 KINDWY KIND WY 01 JOEL BRATTAIN DR CDS R AC 2 200 33 10/2/2018 Slurry Seal 11/19/2025 70 KINSPDR KINGSPORT DR 01 CARRIAGE CIR CUMBERLAND CIR R AC 2 200 33 10/1/2013 Cape Seal 12/4/2025 55 KLINE KLINE LANE 01 CHANDLER DRIVE END CDS R AC 2 765 25 3/31/2023 Slurry Seal 12/17/2025 94 KNGSBRR KINGSBRIAR DR 01 BROOKMONT DR PARKVIEW R AC/AC 2 2,040 33 1/20/2022 AC Overlay 12/12/2025 88 KNGSBRR KINGSBRIAR DR 02 PARKVIEW RIDGEWOOD PL R AC/AC 2 1,008 33 1/24/2022 Slurry Seal 12/12/2025 92 KNNONDR KENNON DR 01 WOODCREST DR CASA LOMA AVE R AC/AC 2 251 33 3/27/2021 AC Overlay 12/9/2025 97 KNNONDR KENNON DR 02 JAY ST RICHFIELD RD R AC 2 511 33 5/28/2021 Slurry Seal 12/9/2025 96 KONKOVWY KONA KOVE WAY 01 SAGA DR END CDS R AC 2 284 33 10/2/2018 Slurry Seal 11/6/2025 78 KRUGRST KRUEGER ST 01 BASTANCHURY RD OAKLAWN LN R AC 2 128 36 10/2/2018 Slurry Seal 11/17/2025 89 LACASAV LA CASITAS AVE 01 AVOCADO AVE DORTHEA ST R AC 2 483 33 10/1/2019 Slurry Seal 11/17/2025 77 LACASAV LA CASITAS AVE 02 AVOCADO AVE BOEING AVE R AC 2 753 33 10/1/2019 Slurry Seal 11/17/2025 75 LACDNA LA CADENA CIR 01 LA ENTRADA END CDS R AC 2 294 33 10/1/2019 Slurry Seal 1/16/2026 76 LACOLTTPL LA COLLETTE PL 01 VAN BUREN ST E END CDS R AC/AC 2 225 33 3/27/2021 AC Overlay 12/3/2025 97 LACOLTTPL LA COLLETTE PL 02 VAN BUREN ST W END CDS R AC/AC 2 664 33 3/27/2021 AC Overlay 12/3/2025 96 A - Arterials, C - Collectors, O - Alleyways, R - Residentials, U - Urban Principal Arterials AC - Asphalt Concrete, AC/AC - Asphalt Concrete Overlay of existing Asphalt Concrete, ST - Surface Treatment Page 874 of 1224 10 of 25 4/29/2026 City of Yorba Linda
2026 Pavement Management Program Update
Section Description Inventory
Local Network
Sorted by Name
Street ID Street Name
Section
ID Beg Location End Location Functional Class
Surface
Type
# Lanes Length
(LF)
Width
(LF) Last Treatment Date Last Treatment PCI Date PCI
LACOLTTPL LA COLLETTE PL 03 SANTA FE ST END CDS R AC/AC 2 136 33 3/27/2021 AC Overlay 12/3/2025 97 LACOLTTPL LA COLLETTE PL 04 JEFFERSON ST END CDS R AC/AC 2 277 37 3/27/2021 AC Overlay 12/3/2025 96 LACON LA CONCETTA DR 01 BASTANCHURY RD JENNIFER DR R AC 2 830 33 10/2/2018 Slurry Seal 11/7/2025 73 LACON LA CONCETTA DR 02 JENNIFER DR END CDS R AC 2 328 33 10/2/2018 Slurry Seal 11/7/2025 49 LACRSCNT LA CRESCENTA 01 AVE DE MARCIA AVE DE MARCIA R AC 2 1,291 37 7/1/2016 Slurry Seal 10/9/2023 72 LACUSTA LA CUESTA CIR 01 LA ENTRADA END CDS R AC 2 256 33 10/1/2019 Slurry Seal 1/16/2026 67 LADECI LADERA CIRCLE 01 CASA LOMA AVE END CDS R AC 2 264 33 10/1/2019 Slurry Seal 11/5/2025 77 LAENTDA LA ENTRADA DR 01 CASA LOMA AVE END CDS R AC 2 1,262 27 10/1/2019 Slurry Seal 11/7/2025 65 LAENTDA LA ENTRADA DR 02 EUREKA AVE CASA LOMA AVE R AC 2 1,276 33 10/1/2019 Slurry Seal 11/7/2025 68 LAFIESTA LA FIESTA 01 AVENIDA DE DESPACIO END CDS R AC 2 845 26 7/1/2016 Slurry Seal 10/9/2023 73 LAGRNDA LA GRANDE 01 AVENIDA DE MARCIA END OF CDS R AC 2 236 33 7/1/2016 Slurry Seal 10/9/2023 82 LAGRNJA VIA LA GRANJA 01 VIA DEL PALMAR END CDS R AC/AC 2 340 33 3/31/2023 AC Overlay 12/5/2025 100 LAHMA LA HOMA 01 LA CRESCENTA END OF CDS R AC 2 342 33 7/1/2016 Slurry Seal 10/9/2023 66 LAKENWY LA KENICE WAY 01 SANTA FE ST TORIDA WAY R AC/AC 2 277 33 3/27/2021 AC Overlay 12/3/2025 95 LAKENWY LA KENICE WAY 02 JEFFERSON ST END CDS R AC/AC 2 285 37 3/27/2021 AC Overlay 12/3/2025 96 LAMPLN LAMPLIGHT LN 01 OHIO ST END CDS R AC 2 545 24 10/1/2019 Slurry Seal 11/18/2025 78 LANCDR LANCER DR 01 JEFFERSON ST END CDS R AC/AC 2 281 37 3/27/2021 AC Overlay 12/3/2025 96 LANDCIRC LANDIG CIRCLE 01 GALLAL WAY END CDS R AC 2 530 33 3/31/2023 Slurry Seal 12/17/2025 95 LANMARAV LANDMARK AVE 01 ROSE DR WINTERHAVEN ST R AC 2 951 33 10/2/2018 Slurry Seal 10/30/2025 69 LANTANA LANTANTA DR 01 HIGHLAND AVE END CDS R AC 2 482 33 5/28/2021 Slurry Seal 12/15/2025 66 LAPACIR LA PAZ CIRCLE 01 EL CAJON AVE END CDS R AC 2 203 33 10/2/2018 Slurry Seal 11/5/2025 89 LAPRMVRA VIA LA PRIMAVERA 01 AVENIDA PUESTA DEL SOL END CDS R AC 2 635 33 10/1/2019 Slurry Seal 1/16/2026 78 LAQNTA VIA LA QUINTA 01 AVENIDA PUESTA DEL SOL END CDS R AC 2 556 33 10/1/2019 Slurry Seal 11/12/2025 84 LATERRA LA TIERRA LN 01 ORLANDO DR GRANDA DR R AC/AC 2 558 36 7/1/2019 AC Overlay 11/13/2025 94 LAVDR LAVENDER DR 01 VALLEY VIEW CIR GARDENIA LN R AC 2 1,305 38 10/2/2018 Slurry Seal 11/3/2025 88 LAVEDR LAVELL DR 01 ARIES DR SAGA DR R AC 2 390 33 10/2/2018 Slurry Seal 2/9/2026 76 LAWDALPL LAWNDALE PL 01 VAN BUREN ST WEBB PL R AC 2 456 33 5/28/2021 Slurry Seal 12/3/2025 96 LDNSYDR LINDSEY DR 01 ESPERANZA RD CHANNING LN R AC 2 512 33 3/31/2023 Slurry Seal 12/6/2025 59 LESPL LESA PL 01 SAGA DR ARIES DR R AC 2 368 33 10/2/2018 Slurry Seal 11/6/2025 81 LFYMDWLN LEAFY MEADOWN LANE 01 BRUSH CANYON DR END OF CDS R AC 2 163 33 7/1/2024 Crack Seal + Slurry Seal + MM + LI + BR 10/11/2023 73 LGNBRRY LOGANBERRY LN 01 BLACKBERRY WAY END OF CDS R AC 2 86 33 7/1/2016 Slurry Seal 10/11/2023 75 LIBPL LIBRA PL 01 ARIES DR END CDS R AC 2 392 33 10/2/2018 Slurry Seal 1/16/2026 62 LINDLN LINDEN LN 01 VALLEY VIEW CIR IRONBARK WY R AC 2 244 33 10/2/2018 Slurry Seal 1/16/2026 68 LINDVIS LINDA VISTA ST 01 YORBA LINDA BLVD YORBA PL O AC 2 290 27 7/1/2009 Slurry Seal 10/30/2025 68 LIPZANLN LIPIZZAN LN 01 CLYDESDALE DR OLDENBURG LN R AC 2 554 31 10/2/2018 Slurry Seal 11/19/2025 95 LIVORNWY LIVORNO WY 01 CHIANTI CT CDS R AC 2 571 33 N/A N/A 11/13/2025 94 LIVPOOST LIVERPOOL ST 01 ORANGE DR YORBA LINDA BLVD R AC 2 1,274 37 10/2/2018 Slurry Seal 11/7/2025 65 LIVPOOST LIVERPOOL ST 02 YELLOWSTONE AVE CALGARY AVE R AC/AC 2 846 33 3/27/2021 AC Overlay 12/9/2025 97 LIVPOOST LIVERPOOL ST 03 BUENA VISTA AVE MELBOURNE LN R AC/AC 2 134 33 3/27/2021 AC Overlay 12/9/2025 96 LKHVN LAKEHAVEN WAY 01 SHORT ST END OF CDS R AC/AC 2 360 33 3/27/2021 AC Overlay 12/15/2025 95 LMALNDA VIA LOMA LINDA N/S 01 AVENIDA DEL ESTE AVENIDA PUESTA DEL SOL R AC 2 888 33 7/1/2009 Slurry Seal 11/12/2025 70 LMALNDASS VIA LOMA LINDA S/S 01 AVENIDA PUESTA DEL SOL END CDS R AC 2 101 33 7/1/2009 Slurry Seal 11/12/2025 70 LMBRDY LOMBARDY LN 01 GRANADA ORLANDO DR R AC/AC 2 650 36 3/30/2023 AC Overlay 11/13/2025 96 LMNS LE MANS CIR 01 MANOR VIEW DR END CDS R AC/AC 2 429 33 1/20/2022 AC Overlay 2/11/2026 85 LNCEWDPLZA LANCEWOOD PLAZA 01 OAK MEADOW DR END CDS R AC 2 551 33 1/24/2022 Slurry Seal 12/12/2025 82 LNDAVRDNS LINDA VERDE N/S 01 GRAND VIEW N/S OHIO ST R AC 2 625 37 5/28/2021 Slurry Seal 12/15/2025 96 LNGBY LONGBAY DR 01 END CDS END CDS R AC 2 1,675 33 3/31/2023 Slurry Seal 12/15/2025 84 LOCVWDR LOGANVIEW DR 01 AVOLINDA DR END CDS R AC 2 348 33 10/1/2019 Slurry Seal 11/11/2025 82 A - Arterials, C - Collectors, O - Alleyways, R - Residentials, U - Urban Principal Arterials AC - Asphalt Concrete, AC/AC - Asphalt Concrete Overlay of existing Asphalt Concrete, ST - Surface Treatment Page 875 of 1224 11 of 25 4/29/2026 City of Yorba Linda
2026 Pavement Management Program Update
Section Description Inventory
Local Network
Sorted by Name
Street ID Street Name
Section
ID Beg Location End Location Functional Class
Surface
Type
# Lanes Length
(LF)
Width
(LF) Last Treatment Date Last Treatment PCI Date PCI
LOGLDDR LOGANLINDA DR 01 CARI LN AVOLINDA DR R AC 2 675 33 10/1/2019 Slurry Seal 11/11/2025 76 LOIST LOIE ST 01 ROSE DR END CDS R AC 2 730 33 10/2/2018 Slurry Seal 11/6/2025 79 LONGCRCI LONCREST CIRCLE 01 HUGGINS AVE END CDS R AC 2 89 33 10/2/2018 Slurry Seal 1/16/2026 69 LONVIEDR LONG VIEW DR E/S 01 HIGHLAND AVE END CDS R AC 2 359 33 5/28/2021 Slurry Seal 12/15/2025 77 LORLN LORI LN 01 SUNNY LN KAYE LN R AC 2 329 33 10/1/2019 Slurry Seal 11/11/2025 70 LOSANGLES LOS ANGELES 01 SECOND ST IMPERIAL HWY C AC 2 485 27 10/2/2018 Slurry Seal 11/7/2025 73 LOSANGLES LOS ANGELES 02 PROSPECT AVE END CDS R AC 2 632 37 10/2/2018 Slurry Seal 2/3/2026 60 LOSPALOM LOS PALOMINOS 01 OHIO ST SILVER SPURS LN R AC 2 421 33 10/1/2019 Slurry Seal 11/18/2025 75 LOTUS LOTUS AVE 01 SLEEPING OAK DR FOX TAIL DR R AC 2 632 33 7/1/2016 Slurry Seal 10/9/2023 78 LPINE LUPINE ST 01 AVENIDA RIO DEL ORO END CDS R AC/AC 2 1,960 33 1/20/2022 AC Overlay 1/8/2026 87 LRCA LORCA LN 01 FAIRMONT BLVD ORLANDO DR R AC/AC 2 143 33 7/1/2019 AC Overlay 11/13/2025 94 LRELVWDR LAUREL VIEW DR 01 LAKEVIEW END OF CDS R AC 2 644 33 5/28/2021 Slurry Seal 12/9/2025 75 LRKFLD LARKFIELD DR 01 KINGSBRIAR DR OAK MEADOW DR R AC 2 250 33 1/24/2022 Slurry Seal 2/11/2026 61 LRKFLD LARKFIELD DR 02 OAKMEADOW DR END CDS R AC 2 456 33 1/24/2022 Slurry Seal 12/12/2025 79 LRKRDGE LARKRIDGE DR 01 CITY BOUNDARY GLENDALE DR R AC 2 151 36 1/24/2022 Slurry Seal 12/17/2025 83 LRLVWCIR LAUREL VIEW CIRCLE 01 LAUREL VIEW DR END CDS R AC 2 220 33 5/28/2021 Slurry Seal 12/9/2025 83 LSESTDS LOS ESTADOS 01 PASEO DE TORONTO END OF CDS R AC 2 1,467 33 7/1/2016 Slurry Seal 10/9/2023 64 LSMNTRS LOS MONTEROS 01 VIA LOMAS DE YORBA PASEO DE TORONTO R AC 2 2,346 37 7/1/2016 Slurry Seal 10/9/2023 55 LSNDRNS LOS ADORNOS 01 LOS MONTEROS END OF CDS R AC 2 915 37 7/1/2016 Slurry Seal 10/9/2023 69 LSPTNS LAS PATRANAS 01 LOS MONTEROS END OF CDS R AC 2 780 37 7/1/2016 Slurry Seal 10/9/2023 64 LSRIOS LOS RIOS 01 PASEO DE TORONTO END OF CDS R AC 2 670 33 7/1/2016 Slurry Seal 10/9/2023 73 LTTLECNYN LITTLE CANYON LN 01 FAIRMONT BLVD END CDS R AC/AC 2 406 31 10/1/2023 AC Overlay 12/2/2025 100 LVEOKLN LIVE OAK LN 01 DEODAR DR END CDS R AC/AC 2 1,620 27 10/1/2023 AC Overlay 12/2/2025 100 LYNNBRK LYNNBROOK PZ 01 END CDS END CDS R AC 2 1,563 33 1/24/2022 Slurry Seal 12/12/2025 75 MAJCYPWY MAJESTIC CYPRESS WAY 01 VAN BUREN ST SUGAR PINE DR R AC 2 716 33 5/28/2021 Slurry Seal 2/9/2026 67 MALGA MALAGA LN 01 END CDS END CDS R AC 2 600 33 10/1/2019 Slurry Seal 11/13/2025 69 MAMOTST MAMMOTH ST 01 CASCADES AVE BUENA VISTA AVE R AC 2 148 33 11/1/2012 AC Overlay 12/4/2025 76 MANDLN MANDARIN LN 01 PLUMOSA DR END CDS R AC 2 480 33 3/23/2023 5" Deep Patch 11/14/2025 45 MARDAV MARDA AVE 01 VALLEY VIEW AVE SECOND ST R AC 2 617 37 10/2/2018 Slurry Seal 11/4/2025 92 MARDAV MARDA AVE 02 SECOND ST FOURTH ST R AC 2 1,283 37 10/2/2018 Slurry Seal 11/4/2025 72 MARIPOAVE MARIPOSA AVE 01 HIGHLAND AVE LAKEVIEW AVE R AC 2 996 33 5/28/2021 Slurry Seal 2/9/2026 60 MARIPOAVE MARIPOSA AVE 02 END CDS HIGHLAND AVE R AC 2 1,500 33 5/28/2021 Slurry Seal 12/15/2025 85 MARLN MARK LN 01 EUREKA AVE SUNNY LN R AC 2 435 33 10/1/2019 Slurry Seal 11/11/2025 70 MCKNZIE MACKENZIE AVE 01 ROANOKE AVE GRANDBY DR R AC 2 1,321 27 10/2/2023 Slurry Seal 12/6/2025 89 MDENMR MAIDEN MOOR LN 01 CAMINO DE BRYANT END CDS R AC 2 174 28 7/1/2025 Crack Seal + Slurry Seal + MM + LI + BR 10/19/2023 88 MDWLKELNE MEADOW LAKE LANE 01 BRUSH CANYON DR END OF CDS R AC/AC 2 419 33 7/1/2024 AC Overlay 10/11/2023 100 MDWLNDDR MEADOW LAND DR 01 BRUSH CANYON DR CAMINO DE BRYANT R AC 2 2,258 33 7/1/2016 Slurry Seal 10/11/2023 52 MEADVIDR MEADOWVIEW DR 01 CASA ORO DR END CDS R AC 2 516 37 10/2/2018 Slurry Seal 11/5/2025 46 MEADVIDR MEADOWVIEW DR 02 JEANEAN LN END CDS R AC 2 439 33 10/2/2018 Slurry Seal 11/6/2025 80 MEADVIDR MEADOWVIEW DR 03 PROSPECT AVE END CDS R AC 2 374 33 10/2/2018 Slurry Seal 11/6/2025 75 MEADVIDR MEADOWVIEW DR 04 CASA LOMA AVE END CDS R AC 2 574 33 10/1/2019 Slurry Seal 2/3/2026 73 MELBORLN MELBOURNE LN 01 END CDS RAINTREE ST R AC/AC 2 628 33 3/27/2021 AC Overlay 12/9/2025 96 MGNLIAWY MAGNOLIA WAY 01 LAKEVIEW AVE MAGNOLIA AVE R AC 2 320 33 5/28/2021 Slurry Seal 12/17/2025 87 MGNOLIAAVE MAGNOLIA AVE 01 MAGNOLIA WAY PEPPER GROVE ST R AC 2 425 33 5/28/2021 Slurry Seal 12/17/2025 90 MHGNY MAHOGANY CIR 01 MANZANITA AVE END CDS R AC/AC 2 730 33 10/1/2023 AC Overlay 12/2/2025 91 MILANCT MILANO CT 01 TRENTINO LN GENOA WY R AC 2 1,940 33 N/A N/A 11/13/2025 76 MIMODR MIMOSA DR 01 EL CAJON AVE N END CDS R AC 2 157 33 10/2/2018 Slurry Seal 1/16/2026 51 MIMODR MIMOSA DR 02 EL CAJON AVE S END CDS R AC 2 415 33 10/2/2018 Slurry Seal 11/6/2025 81 A - Arterials, C - Collectors, O - Alleyways, R - Residentials, U - Urban Principal Arterials AC - Asphalt Concrete, AC/AC - Asphalt Concrete Overlay of existing Asphalt Concrete, ST - Surface Treatment Page 876 of 1224 12 of 25 4/29/2026 City of Yorba Linda
2026 Pavement Management Program Update
Section Description Inventory
Local Network
Sorted by Name
Street ID Street Name
Section
ID Beg Location End Location Functional Class
Surface
Type
# Lanes Length
(LF)
Width
(LF) Last Treatment Date Last Treatment PCI Date PCI
MINDDR MINDEN DR 01 BRIARHILL DR CASA ORO DR R AC 2 229 37 10/2/2018 Slurry Seal 11/6/2025 77 MINDDR MINDEN DR 02 CASA ORO DR END CDS R AC 2 345 37 10/2/2018 Slurry Seal 11/6/2025 56 MIRAGE MIRAGE ST 01 SAVI RANCH PKWY OLD CANAL RD. C AC 3 436 61 7/1/2016 Slurry Seal 10/19/2023 69 MIRAGE MIRAGE ST 02 SAVI RANCH PKWY CRYSTAL C AC 5 450 61 7/1/2016 Slurry Seal 10/19/2023 64 MJRCA MAJORCA LN 01 ORLANDO DR END CDS R AC/AC 2 380 33 3/30/2023 AC Overlay 11/13/2025 96 MLBRRYLNE MULBERRY WAY 01 BRUSH CANYON DR END OF CDS R AC 2 330 33 7/1/2016 Slurry Seal 10/11/2023 68 MNRVW MANOR VIEW DR 01 FUTURA DR CAPRICE DR R AC/AC 2 1,184 33 1/20/2022 AC Overlay 1/8/2026 90 MNSTRT MAIN ST 02 LEMON DR END CDS R AC 2 460 33 10/1/2019 Slurry Seal 11/11/2025 79 MNTCTO MONTECITO DR 01 GRANDVIEW AVE EUCALYPTUS HILL R AC/AC 2 676 33 3/27/2021 AC Overlay 12/17/2025 97 MNTHD MOUNT HOOD WAY 01 SMOKEY MTN WAY END CDS R AC 2 1,167 28 7/1/2025 Crack Seal + Slurry Seal + MM + LI + BR 10/10/2023 90 MNTRNER MOUNT RAINER WAY 01 SMOKEY MTN WAY END OF CDS R AC 2 901 28 7/1/2025 Crack Seal + Slurry Seal + MM + LI + BR 10/10/2023 94 MNTSHSTA MOUNT SHASTA WAY 01 SMOKEY MTN WAY END OF CDS R AC 2 1,311 28 7/1/2025 Crack Seal + Slurry Seal + MM + LI + BR 10/10/2023 90 MNTWHTNY MOUNT WHITNEY WAY 01 ELK MTN WAY END CDS R AC 2 724 28 7/1/2025 Crack Seal + Slurry Seal + MM + LI + BR 10/10/2023 77 MNZANTA MANZANITA AVE 01 PEPPER AVE VILLAGE CENTER DR R AC/AC 2 401 33 10/1/2023 AC Overlay 12/2/2025 99 MNZANTA MANZANITA AVE 02 VILLAGE CENTER DR SMOKETREE W/S R AC/AC 2 750 31 10/1/2023 AC Overlay 12/2/2025 99 MNZANTA MANZANITA AVE 03 SMOKETREE E/S END CDS R AC 2 1,423 27 10/2/2023 Slurry Seal 12/2/2025 80 MOLLN MOLLIE LN 01 KAYE LN END CDS R AC 2 148 33 10/1/2019 Slurry Seal 11/11/2025 77 MONCI MONETTE CIRCLE 01 RICHFIELD RD END CDS R AC 2 484 33 5/28/2021 Slurry Seal 12/10/2025 77 MONTCI MONTEREY CIRCLE 01 WISTERIA DR END CDS R AC 2 66 33 10/1/2019 Slurry Seal 1/16/2026 72 MORGCT MORGAN CT 01 JUTLAND LN CDS R AC 2 353 32 10/2/2018 Slurry Seal 11/19/2025 77 MOUNTNVW MOUNTAIN VIEW AVE 01 END CDS KELLOGG DR O AC 2 1,593 33 12/10/2005 Slurry Seal 12/18/2025 67 MOUNTNVW MOUNTAIN VIEW AVE 02 LYNNBROOK PZ COUNTRY VIEW DR R AC 2 342 33 1/24/2022 Slurry Seal 12/12/2025 70 MOUNTNVW MOUNTAIN VIEW AVE 03 KELLOGG DR OHIO ST S/S C AC 2 1,783 33 5/28/2021 Slurry Seal 12/18/2025 68 MOUNTNVW MOUNTAIN VIEW AVE 04 OHIO ST S/S END OF ROAD C AC 2 1,717 24 5/28/2021 Slurry Seal 12/22/2025 70 MOUNTNVW MOUNTAIN VIEW AVE 05 YORBA LINDA BLVD END CDS R AC/AC 2 641 37 3/27/2021 AC Overlay 12/9/2025 97 MPLECRCLE MAPLE CIRCLE 01 GLOXINIA DR END CDS R AC/AC 2 82 33 10/1/2023 AC Overlay 12/18/2025 92 MRAHCT MARIAH CT 01 PROSPECT DR END CDS R AC 2 600 33 10/2/2018 Slurry Seal 10/31/2025 58 MRKWOOD MIRKWOOD RUN 01 LIVE OAK LN END CDS R AC/AC 2 846 27 10/1/2023 AC Overlay 12/2/2025 91 MRNINGDWWYMORNING DEW WAY 01 EVENING BREEZE END OF CDS R AC/AC 3 403 33 7/1/2024 AC Overlay 10/11/2023 100 MRQTCRT MARQUET COURT 01 PICASSO DR END OF CDS R AC 2 261 33 7/1/2016 Slurry Seal 10/10/2023 77 MRRYWTHR MERRY WEATHER CIR 01 BLUE RIDGE DR END OF CDS R AC 2 61 28 7/1/2016 Slurry Seal 10/19/2023 85 MRSALA MARSALA DR 01 CORDOVA PALOMA LN R AC 2 737 36 10/1/2019 Slurry Seal 11/13/2025 66 MRSHBRNCIR MARSHBURN CIRCLE 01 YORBNA LINDA BLVD END CDS R AC/AC 2 411 33 3/27/2021 AC Overlay 12/9/2025 96 MSSNHLLS MISSION HILLS LANE 01 HIDDEN HILLS RD STARWOOD S/S R AC/AC 2 1,827 33 10/1/2023 AC Overlay 12/3/2025 96 MSSNHLLS MISSION HILLS LANE 02 STARWOOD S/S HIDDEN HILLS RD R AC/AC 2 669 33 10/1/2023 AC Overlay 2/11/2026 96 MSTWY MISTY WAY 01 WEATHERLY DR END CDS R AC 2 313 33 10/1/2019 Slurry Seal 11/11/2025 91 MTTRMPH MT TRUMPH WAY 01 KODIAK MTN DR END OF CDS R AC 2 1,020 33 7/1/2025 Crack Seal + Slurry Seal + MM + LI + BR 10/10/2023 92 NAPCT NAPLES CT 01 UMBRIA WY CDS R AC 2 833 33 N/A N/A 11/13/2025 85 NEFRANRD NEFF RANCH RD 01 RICHFIELD RD END CDS R AC 2 762 33 5/28/2021 Slurry Seal 12/15/2025 86 NIANPL NIANTIC PL 01 LA CASITAS AVE END CDS R AC 2 175 33 10/1/2019 Slurry Seal 11/17/2025 70 NICKLRD NICKLAUS RD 01 SHEEHAN ST CDS R AC 2 796 33 10/2/2018 Slurry Seal 11/18/2025 70 NOGAV NOGAL AVE 01 LA CASITAS AVE END R AC 2 494 33 10/1/2019 Slurry Seal 11/17/2025 70 NORFOCI NORFOLK CIRCLE 01 RUTLAND DR END CDS R AC 2 91 33 10/1/2013 Cape Seal 12/4/2025 76 NVADR NOVA DR 01 MANOR VIEW DR FAIRMONT BLVD R AC/AC 2 140 37 1/20/2022 AC Overlay 1/8/2026 97 OABUDR OAK BURL DR 01 GREY STONE DR SAND ROCK CIRCLE R AC 2 241 33 10/2/2018 Slurry Seal 10/30/2025 61 OAKHILDR OAKHILL DR 01 CLOVERDALE WY END CDS R AC 2 685 27 10/2/2018 Slurry Seal 11/3/2025 86 OAKHURCI OAKHURST CIRCLE 01 ROSE DR END CDS R AC 2 615 33 10/2/2018 Slurry Seal 11/6/2025 74 OAKLWNLN OAKLAWN LN 01 HOOSTER LAWN WY CDS R AC 2 1,078 37 10/2/2018 Slurry Seal 11/17/2025 82 A - Arterials, C - Collectors, O - Alleyways, R - Residentials, U - Urban Principal Arterials AC - Asphalt Concrete, AC/AC - Asphalt Concrete Overlay of existing Asphalt Concrete, ST - Surface Treatment Page 877 of 1224 13 of 25 4/29/2026 City of Yorba Linda
2026 Pavement Management Program Update
Section Description Inventory
Local Network
Sorted by Name
Street ID Street Name
Section
ID Beg Location End Location Functional Class
Surface
Type
# Lanes Length
(LF)
Width
(LF) Last Treatment Date Last Treatment PCI Date PCI
OATR OAK TREE CT 01 AVOCADO AVE OAK TREE CT R AC 2 144 33 10/1/2019 Slurry Seal 11/17/2025 75 OATR OAK TREE CT 02 S END CDS N END CDS R AC 2 375 37 10/1/2019 Slurry Seal 11/17/2025 76 ODCNLRD OLD CANAL ROAD 01 BRIDGE @ WEIR CANYON SAVI RANCH PKWY C AC 3 2,922 50 7/1/2016 Slurry Seal 10/19/2023 71 ODEDR ODESSA DR 01 END CDS ROXDALE DR R AC 2 603 33 10/2/2018 Slurry Seal 10/30/2025 78 OHIOST OHIO ST 01 END OF CDS SHORT ST R AC 2 1,095 33 5/28/2021 Slurry Seal 12/15/2025 96 OHIOST OHIO ST 02 SHORT ST SCENIC VIEW R AC 2 787 33 5/28/2021 Slurry Seal 12/15/2025 70 OHIOST OHIO ST 03 END CDS LINDA VERDE R AC 2 382 37 5/28/2021 Slurry Seal 12/15/2025 64 OHIOST OHIO ST 04 LINDA VERDE BUENA VISTA AVE R AC 2 467 37 5/28/2021 Slurry Seal 12/15/2025 75 OHIOST OHIO ST 05 MOUNTAIN VIEW AVE YORBA LINDA BLVD R AC 2 2,390 33 5/28/2021 Slurry Seal 12/8/2025 72 OKLEFLN OAK LEAF LN 01 EUREKA LN ACORN CT R AC/AC 2 461 33 7/1/2019 AC Overlay 11/11/2025 94 OKMDW OAK MEADOW DR 01 FAIRMONT BLVD BROOKMOUNT DR R AC 2 2,921 33 1/24/2022 Slurry Seal 1/29/2026 88 OLDBURLN OLDENBURG LN 01 LIPIZZAN LN FALABELLA LN R AC 2 518 32 10/2/2018 Slurry Seal 11/19/2025 95 OLDVLLG OLD VILLAGE RD 01 LA PALMA LA PALMA R AC 2 1,562 33 7/1/2016 Slurry Seal 10/19/2023 71 OLINDST OLINDA ST 01 IMPERIAL HWY LEMON DR R AC 2 436 40 10/1/2019 Slurry Seal 11/11/2025 93 OLIVETRCR OLIVE TREE CIRCLE 01 RICHFIELD RD W END CDS R AC/AC 2 560 33 3/27/2021 AC Overlay 12/9/2025 96 ORAGATDR ORANGE GATE DR 01 ORCHARD DR END CDS R AC 2 761 34 5/28/2021 Slurry Seal 12/15/2025 97 ORANBLN ORANGEBLOSSOM LN 01 HARVEST WAY END CDS R AC 2 555 33 5/28/2021 Slurry Seal 12/9/2025 78 ORANDR ORANGE DR 01 LIBRA PL SANTA FE R AC 2 523 33 10/2/2018 Slurry Seal 10/31/2025 76 ORANDR ORANGE DR 02 SANTA FE 100'' W/O BRIARHILL R AC 2 622 37 10/2/2018 Slurry Seal 10/31/2025 69 ORANDR ORANGE DR 03 100'' W/O BRIARHILL VALLEY VIEW AVE R AC 2 1,274 33 10/2/2018 Slurry Seal 2/2/2026 60 ORANDR ORANGE DR 04 JEANEAN LN ROSE DR R AC 2 591 33 10/2/2018 Slurry Seal 10/31/2025 79 ORANDR ORANGE DR 05 BROOKWAY AVE PROSPECT AVE R AC 2 390 33 10/2/2018 Slurry Seal 2/9/2026 76 ORANWDLN ORANGEWOOD LN 01 HARVEST WAY END CDS R AC 2 535 33 5/28/2021 Slurry Seal 12/9/2025 66 ORIENTE ORIENTE DR 01 LAKEVIEW AVE OHIO ST C AC 2 2,635 33 10/1/2019 Slurry Seal 11/18/2025 79 ORIENTE ORIENTE DR 02 OHIO ST PALM AVE C AC 2 1,310 33 10/1/2019 Slurry Seal 11/18/2025 75 ORLNDO ORLANDO DR 01 LOMBARDY LN LA TIERRA LN R AC/AC 2 1,170 36 7/1/2019 AC Overlay 11/13/2025 94 ORTERRACE ORANGE TERRACE 01 VALLEY VIEW END CDS R AC 2 437 37 10/2/2018 Slurry Seal 11/5/2025 82 OSMOST OSMOND ST 01 BASTANCHURY RD END R AC 2 870 33 10/2/2018 Slurry Seal 2/3/2026 92 OYSTERBY OYSTER BAY 01 DIAMOND HILL SOMERSET RD R AC 2 343 33 10/2/2018 Slurry Seal 11/19/2025 70 PABLORD PABLO ROAD 01 DOMINGUEZ RANCH RD N END CDS R AC/AC 2 575 33 10/1/2023 AC Overlay 12/18/2025 95 PACAV PACIFIC AVE 01 END CASA LOMA AVE R AC 2 160 33 10/2/2018 Slurry Seal 2/2/2026 60 PACAV PACIFIC AVE 02 CASA LOMA AVE DENVER AVE R AC 2 269 33 10/2/2018 Slurry Seal 1/16/2026 79 PACAV PACIFIC AVE 03 LA CONCETTA DR RICARDO DR R AC 2 243 33 10/2/2018 Slurry Seal 11/7/2025 76 PAGCT PAGE CT 01 RICHFIELD RD END CDS R AC 2 567 38 5/28/2021 Slurry Seal 12/9/2025 82 PARKAV PARK AVE 01 YORBA LINDA BLVD LEMON DR R AC 2 1,314 29 9/27/2022 6" Grind & Cap 1/16/2026 56 PARPL PARK PL 01 PARK AVE YORBA LINDA BLVD R AC 2 488 36 10/1/2019 Slurry Seal 1/16/2026 63 PASDELARAM PASEO DE LA RAMBLA 01 PASEO DE LA CUMBRE PASEO DEL PRADO R AC/AC 2 2,015 34 10/1/2023 AC Overlay 12/18/2025 94 PASDERAM PASEO DE LA RAMBLA 01 PASEO DEL PRADO CALLE VISTA LINDA R AC/AC 2 185 34 3/31/2023 AC Overlay 12/18/2025 100 PASEOALTO PASEO ALTO 01 PASEO DE LAS PALOMAS E END CDS R AC 2 240 33 3/31/2023 Slurry Seal 12/5/2025 73 PASEOARN PASEO ARNALDO 01 PASEO LORENZO N END CDS R AC/AC 2 140 33 1/20/2022 AC Overlay 1/8/2026 77 PASEOCAL PASEO CALIENTE 01 PASEO SERRA PASEO TORTUGA R AC/AC 2 380 33 10/1/2023 AC Overlay 12/17/2025 95 PASEODELRE PASEO DEL RETIRO 01 PASEO DE LA CUMBRE S END CDS R AC 2 1,250 30 10/2/2023 Slurry Seal 12/18/2025 72 PASEOPAN PASEO PANORAMA 01 PASEO DEL PRADO PASEO ALTO R AC/AC 2 1,910 33 3/31/2023 AC Overlay 12/5/2025 99 PASEORIC PASEO RICO 01 CARLOS ROAD VIA CORONADO R AC/AC 2 645 33 10/1/2023 AC Overlay 12/17/2025 94 PASEOSER PASEO SERRA 01 CARLOS ROAD PASEO CALIENTE R AC/AC 2 400 33 10/1/2023 AC Overlay 12/17/2025 97 PASEOTOR PASEO TORTUGA 01 PASEO CALIENTE TRAIL SIDE DRIVE R AC/AC 2 770 33 10/1/2023 AC Overlay 12/22/2025 90 PASFINWY PASO FINO WY 01 CLYDESDALE DR CDS R AC 2 677 32 10/2/2018 Slurry Seal 11/19/2025 74 PASFINWY PASO FINO WY 02 CLYDESDALE DR BELGIAN LN R AC 2 375 32 10/2/2018 Slurry Seal 2/9/2026 82 A - Arterials, C - Collectors, O - Alleyways, R - Residentials, U - Urban Principal Arterials AC - Asphalt Concrete, AC/AC - Asphalt Concrete Overlay of existing Asphalt Concrete, ST - Surface Treatment Page 878 of 1224 14 of 25 4/29/2026 City of Yorba Linda
2026 Pavement Management Program Update
Section Description Inventory
Local Network
Sorted by Name
Street ID Street Name
Section
ID Beg Location End Location Functional Class
Surface
Type
# Lanes Length
(LF)
Width
(LF) Last Treatment Date Last Treatment PCI Date PCI
PASGILB PASEO GILBERTO 01 VISTA MONTANA PASEO LORENZO R AC/AC 2 1,600 33 1/20/2022 AC Overlay 1/8/2026 88 PASJOAQ PASEO JOAQUIN 01 PASEO LORENZO END CDS R AC/AC 2 502 33 1/20/2022 AC Overlay 1/8/2026 80 PASLOR PASEO LORENZO 01 PASEO GILBERTO VISTA LAGUNA R AC/AC 2 1,261 33 1/20/2022 AC Overlay 1/8/2026 82 PASLUI PASEO LUIS 01 PASEO GILBERTO END CDS R AC 2 764 33 1/24/2022 Slurry Seal 1/8/2026 79 PBBLBCH PEBBLE BEACH LN 01 FIRCREST DR MOUNTIAN VIEW AVE R AC/AC 2 474 33 3/27/2021 AC Overlay 12/8/2025 96 PCSSO PICASSO DR 01 CAMINO DE BRYANT END OF CDS R AC 2 1,543 33 7/1/2016 Slurry Seal 10/10/2023 80 PEATRELN PEACH TREE LN 01 APPLE ORCHARD DR END CDS R AC 2 268 33 10/2/2018 Slurry Seal 11/5/2025 86 PEPPRES PEPPER AVE. E/S 01 LIVE OAK LN VILLAGE CENTER DR R AC/AC 2 250 27 10/1/2023 AC Overlay 12/2/2025 100 PEPPRGRVE PEPPERGROVE ST 01 END OF CDS LAKEVIEW AVE R AC 2 816 33 5/28/2021 Slurry Seal 12/17/2025 88 PEPPRTRLNE PEPPERTREE LANE 01 SADDLETREE LN END CDS R AC 2 430 33 1/24/2022 Slurry Seal 12/17/2025 75 PEPPRWS PEPPER AVE. W/S 01 VILLAGE CENTER DR END CDS R AC/AC 2 2,544 33 10/1/2023 AC Overlay 12/2/2025 97 PIMLTER PIMLICO TER 01 SANTA ANITA WAY CDS R AC 2 472 34 10/2/2018 Slurry Seal 11/13/2025 83 PINCIR PINE CIRCLE 01 RICH HILL WAY END CDS R AC/AC 2 332 37 3/27/2021 AC Overlay 12/10/2025 97 PINRIDGDR PINERIDGE DR 01 HIGHLAND AVE END CDS R AC/AC 2 501 33 3/27/2021 AC Overlay 12/15/2025 95 PIPPL PIPER PL 01 BOEING AVE END CDS R AC 2 140 33 10/1/2019 Slurry Seal 11/17/2025 70 PIPPL PIPER PL 02 LAKEVIEW AVE PLUMOSA DR R AC 2 1,224 37 10/1/2019 Slurry Seal 11/11/2025 75 PLCRVLLE PLACERVILLE PL 01 FURNACE CREEK RD END CDS R AC 2 142 33 1/24/2022 Slurry Seal 12/17/2025 83 PLMA PALOMA LN 01 END CDS END CDS R AC 2 443 36 10/1/2019 Slurry Seal 11/13/2025 90 PLUDR PLUMOSA DR 01 CARI LN LEMON DR R AC 2 1,717 37 4/5/2023 AC Deep Patch 11/11/2025 68 PLUDR PLUMOSA DR 02 CARI LN BASTANCHURY RD R AC 2 1,168 33 4/4/2023 AC Deep Patch 11/11/2025 75 PLUTRELN PLUM TREE LN 01 RICHFIELD RD END CDS R AC 2 639 33 5/28/2021 Slurry Seal 12/15/2025 87 PMGRNTE POMEGRANATE 01 CAMINO DE BRYANT RANCHO SANTA ANA R AC 2 850 33 7/1/2016 Slurry Seal 10/10/2023 86 PNECRST PINE CREST CIR 01 FAIRMONT BLVD END CDS R AC/AC 2 506 33 10/1/2023 AC Overlay 12/2/2025 98 PNEMDW PINE MEADOW WAY 01 MEADOWLAND LANE END OF CDS R AC/AC 2 1,219 33 7/1/2024 AC Overlay 10/11/2023 100 PNGREE PINGREE WAY 01 CHANNING LANE END CDS R AC 2 821 33 3/31/2023 Slurry Seal 12/6/2025 89 PONDRSAWY PONDEROSA WY 01 NORTH END CDS SOUTH END CDS R AC 2 837 33 10/2/2018 Slurry Seal 11/5/2025 74 PRENTDR PRENTISS DR 01 LOIE ST END CDS R AC 2 636 33 10/2/2018 Slurry Seal 11/6/2025 72 PRENTPL PRENTISS PL 01 PRENTISS DR END CDS R AC 2 108 33 10/2/2018 Slurry Seal 11/6/2025 75 PRIROSLN PRIMROSE LN 01 JASMINE WY CDS R AC 2 436 33 10/2/2018 Slurry Seal 11/3/2025 93 PRKHRST PARKHURST PL 01 COUNTRY VIEW DR END CDS R AC 2 715 33 1/24/2022 Slurry Seal 12/17/2025 78 PRKRDGE PARK RIDGE 01 KELLOG WAGON WHEEL R AC 2 122 30 1/24/2022 Slurry Seal 12/22/2025 83 PRKSDEDR PARKSIDE DR 01 SADDLETREE LANE COUNTRY VIEW DR R AC 2 1,052 33 1/24/2022 Slurry Seal 12/17/2025 75 PRKVW PARKVIEW TER 01 OAK MEADOW DR LYNNBROOK PZ R AC 2 475 34 1/24/2022 Slurry Seal 12/12/2025 94 PRKVWES PARKVIEW TER 01 OAK MEADOW DR KINGSBRIAR DR R AC 2 244 33 1/24/2022 Slurry Seal 12/12/2025 77 PRSPCT PROSPECT AVE 01 IMPERIAL HWY WABASH AVE R AC 2 1,553 37 10/2/2018 Slurry Seal 10/31/2025 71 PRSPCT PROSPECT AVE 02 IMPERIAL HWY BASTANCHURY RD R AC 2 974 33 10/2/2018 Slurry Seal 10/31/2025 80 PRSPCT PROSPECT AVE 03 BASTANCHURY RD HILLCREST CIRCLE R AC 2 2,050 33 10/2/2018 Slurry Seal 10/31/2025 66 PRSPCT PROSPECT AVE 04 HILLCREST CIRCLE YORBA LINDA BLVD R AC 2 1,822 33 10/2/2018 Slurry Seal 10/31/2025 61 PSDLCMBRE PASEO DE LA CUMBRE 01 YORBA RANCH RD PASEO DEL PRADO R AC/AC 2 2,371 37 10/1/2023 AC Overlay 12/18/2025 95 PSDTRNTO PASEO DE TORONTO 01 CAMINO DE BRYANT W/S CANTADA E/S R AC 2 2,200 33 7/1/2025 Crack Seal + Slurry Seal + MM + LI + BR 10/20/2023 73 PSDTRNTO PASEO DE TORONTO 02 CANTADA E/S VIA LOMAS DE YORBA R AC 2 1,231 33 7/1/2025 Crack Seal + Slurry Seal + MM + LI + BR 10/20/2023 74 PSDTRNTO PASEO DE TORONTO 03 VIA LOMAS DE YORBA AVENIDA DEL TREN R AC/AC 2 1,759 33 7/1/2025 AC Overlay 10/9/2023 100 PSODLPRDO PASEO DEL PRADO 01 PASEO DE LAS PALOMAS CIRCULO VISTA N/S C AC 2 2,136 52 3/31/2023 Slurry Seal 12/22/2025 68 PSODLPRDO PASEO DEL PRADO 02 CIRCULO VISTA N/S ESPERANZA RD C AC 2 2,310 52 3/31/2023 Slurry Seal 12/22/2025 70 PSTADLSLWS PUESTA DEL SOL W/S 01 AVENIDA RIO DEL ORO AVENIDA DE LAS FLORES R AC 2 1,030 36 10/1/2019 Slurry Seal 1/16/2026 63 PTMAC POTOMAC AVE 01 ROANOKE AVE GRANBY DR R AC/AC 2 813 27 10/1/2023 AC Overlay 12/6/2025 100 PUNTODEVIS PUNTO DE VISTA 01 VIA INGRESO VISTA DEL AMIGO R AC 2 420 33 3/31/2023 Slurry Seal 12/5/2025 68 PUSTADLSL PUESTA DEL SOL E/S 01 VIA DE LA LUNA AVENIDA DEL ESTE R AC 2 820 33 7/1/2009 Slurry Seal 11/12/2025 77 A - Arterials, C - Collectors, O - Alleyways, R - Residentials, U - Urban Principal Arterials AC - Asphalt Concrete, AC/AC - Asphalt Concrete Overlay of existing Asphalt Concrete, ST - Surface Treatment Page 879 of 1224 15 of 25 4/29/2026 City of Yorba Linda
2026 Pavement Management Program Update
Section Description Inventory
Local Network
Sorted by Name
Street ID Street Name
Section
ID Beg Location End Location Functional Class
Surface
Type
# Lanes Length
(LF)
Width
(LF) Last Treatment Date Last Treatment PCI Date PCI
PUSTADLSL PUESTA DEL SOL E/S 02 VIA DE LA LUNA AVENIDA RIO DEL ORO R AC 2 238 36 10/1/2019 Slurry Seal 2/9/2026 49 QUAIL QUAIL CIR 01 FAIRMONT BLVD END CDS R AC/AC 2 254 33 10/1/2023 AC Overlay 12/2/2025 100 QUARHRSDR QUARTER HORSE DR 01 FAIRMONT BLVD CDS R AC 2 1,257 37 10/2/2018 Slurry Seal 11/19/2025 92 QUIMEADLN QUIET MEADOW LN 01 ARBOR GATE LN COBBLESTONE CT R AC 2 285 33 10/1/2019 Slurry Seal 11/17/2025 90 RAINBLN RAINBOW LN 01 WEATHERLY DR END CDS R AC 2 424 33 10/1/2019 Slurry Seal 11/11/2025 89 RAINTRST RAINTREE ST 01 MELBOURNE LN CALGARY AVE R AC/AC 2 1,736 33 4/2/2023 AC Deep Patch 12/9/2025 90 RAMRD RAMONA ROAD 01 DOMINGUEZ RANCH RD N DOMINGUEZ RANCH RD S R AC/AC 2 2,000 33 10/1/2023 AC Overlay 12/17/2025 98 RANCLN RANCHO LN 01 PROSPECT AVE W END CDS R AC 2 577 33 10/2/2018 Slurry Seal 11/5/2025 89 RANCLN RANCHO LN 02 PROSPECT AVE E END CDS R AC 2 727 33 10/2/2018 Slurry Seal 11/5/2025 77 RCHFIELD RICHFIELD WAY 01 YORBA LINDA BLVD END CDS R AC 2 225 37 10/2/2018 ARHM Overlay 2/3/2026 58 RCKHMPTN ROCKHAMPTON CT 01 STONEHAVEN DR END OF CDS R AC 2 1,360 33 7/1/2024 Crack Seal + Slurry Seal 2/2/2026 82 RDGEPRK RIDGE PARK DR 01 SAN ANTONIO RD END CDS R AC/AC 2 1,651 37 10/1/2023 AC Overlay 12/2/2025 97 RDGWDPLCE RIDGEWOOD PL 01 KINGSBRAIR DR OAK MEADOW DR R AC/AC 2 217 33 1/20/2022 AC Overlay 12/12/2025 92 RDGWDPLCE RIDGEWOOD PL 02 OAK MEADOW DR BROOKHILL DR R AC 2 1,075 33 1/24/2022 Slurry Seal 12/12/2025 73 RDGWY RIDGE WAY 01 SHORT ST END OF CDS R AC 2 889 33 5/28/2021 Slurry Seal 12/15/2025 88 REBECLN REBECCA LN 01 RICHFIELD RD END CDS R AC/AC 2 479 33 3/27/2021 AC Overlay 12/15/2025 96 REDCASTST REDCASTLE ST 01 TIPPERARY CT GALWAY BAY RD R AC 2 262 33 10/2/2018 Slurry Seal 11/19/2025 70 REDRNLN RED ROAN LN 01 JUTLAND LN CDS R AC 2 1,389 33 10/2/2018 Slurry Seal 11/19/2025 69 REDWODST REDWOOD ST 01 CASCADES AVE CUMBERLAND CIR R AC 2 679 33 11/1/2012 AC Overlay 12/4/2025 77 REGDR REGULUS DR 01 VAN BUREN ST BRIARHILL DR R AC 2 557 37 10/2/2018 Slurry Seal 11/7/2025 84 REGDR REGULUS DR 02 SANTA FE ST END R AC 2 465 33 3/23/2023 4" Deep Patch 11/6/2025 78 REPNRD RED PINE RD 01 VALLEY VIEW CIR CDS R AC 2 651 33 10/2/2018 Slurry Seal 11/3/2025 86 RGLOK REGAL OAKS DR 01 CASSIA LN END CDS R AC 2 263 27 10/2/2023 Slurry Seal 12/2/2025 75 RICDR RICARDO DR 01 PACIFIC AVE END CDS R AC 2 215 33 10/2/2018 Slurry Seal 11/7/2025 77 RICHILWY RICH HILL WAY 01 120'' S/O MONETTE CIR END CDS R AC 2 180 33 5/28/2021 Slurry Seal 12/10/2025 74 RICHILWY RICH HILL WAY 02 120'' S/O MONETTE CIR PINE CIR R AC 2 1,690 37 5/28/2021 Slurry Seal 2/9/2026 63 RICHILWY RICH HILL WAY 03 PINE CIR WILLOW CIR R AC/AC 2 245 37 3/27/2021 AC Overlay 12/10/2025 97 RICHPL RICHFIELD PL 01 END CDS END CDS R AC 2 245 33 5/28/2021 Slurry Seal 12/10/2025 93 RIDELPLA RIO DE PLATA DR 01 LAKEVIEW AVE SCHOOL ST R AC 2 464 33 10/1/2019 Slurry Seal 11/11/2025 55 RIDEORDR RIO DE ORO DR 01 SCHOOL ST VALENCIA AVE R AC 2 305 33 10/1/2019 Slurry Seal 11/11/2025 44 RIDGCRESDR RIDGECREST DR 01 RICHFIELD RD CASA LOMA AVE R AC 2 796 37 5/28/2021 Slurry Seal 12/15/2025 97 RIDGDALN RIDGEDALE LN 01 CARLTON PL VALLEY VIEW AVE R AC 2 460 33 10/2/2018 Slurry Seal 11/4/2025 79 RIODLORO AVENIDA RIO DEL ORO 01 YORBA LINDA BLVD PUESTA DEL SOL N/S R AC 4 595 50 1/24/2022 Slurry Seal 1/16/2026 41 RIODLORO AVENIDA RIO DEL ORO 02 AVENIDA DEL NORTE PUESTA DEL SOL N/S R AC 2 2,360 36 10/1/2019 Slurry Seal 11/12/2025 87 RIODLORO AVENIDA RIO DEL ORO 03 YORBA LINDA BLVD FELICIA DR R AC 2 415 40 7/1/2015 Slurry Seal 1/8/2026 71 RIVRVW RIVERVIEW DR 01 END CDS GLENDALE DR R AC 2 572 33 1/24/2022 Slurry Seal 12/17/2025 83 RLLNGHLLS ROLLING HILLS LN 01 END OF CDS END OF CDS R AC/AC 2 1,430 33 10/1/2023 AC Overlay 12/3/2025 99 RMCRSTDR RIM CREST DR 01 FAIRMONT BLVD BLUE GUM R AC/AC 2 2,214 37 12/1/2022 2" Grind & Cap 12/2/2025 100 RNCHSNTANA RANCHO SANTA ANA 01 POMEGRATE RD SUSANNA BRYANT R AC 2 720 33 7/1/2016 Slurry Seal 10/10/2023 82 RNGSPRNGWYRUNNING SPRING WAY 01 EVENING BREEZE N/S BRUSH CANYON N/S R AC/AC 2 920 30 7/1/2024 AC Overlay 10/11/2023 100 RNOKE ROANOKE AVE 01 AVENIDA ADOBE TODD AVE R AC/AC 2 840 35 10/1/2023 AC Overlay 12/6/2025 100 RNWD RAINWOOD AVE 01 PEPPER AVE PEPPER AVE R AC/AC 2 1,615 27 10/1/2023 AC Overlay 12/2/2025 98 ROBNCIR ROBIN CIRCLE 01 WALNUT LANE END OF CDS R AC 2 150 37 5/28/2021 Slurry Seal 1/16/2026 53 ROCROSCI ROCKROSE CIR 01 RICHFIELD RD END CDS R AC/AC 2 441 33 3/27/2021 AC Overlay 12/9/2025 92 ROSBUDR ROSEBUD DR 01 PROSPECT AVE END CDS R AC 2 584 33 10/2/2018 Slurry Seal 11/6/2025 66 ROXDADR ROXDALE DR 01 END CDS END R AC 2 400 33 10/2/2018 Slurry Seal 2/11/2026 80 RSWD ROSEWOOD DR 01 BOX CANYON DR SLEEPING OAK DR R AC 2 155 33 7/1/2016 Slurry Seal 10/9/2023 86 RUMST RUMSON ST 01 GREENWICH CIR WINDEMERE DR R AC 2 109 33 10/1/2013 Cape Seal 12/4/2025 49 A - Arterials, C - Collectors, O - Alleyways, R - Residentials, U - Urban Principal Arterials AC - Asphalt Concrete, AC/AC - Asphalt Concrete Overlay of existing Asphalt Concrete, ST - Surface Treatment Page 880 of 1224 16 of 25 4/29/2026 City of Yorba Linda
2026 Pavement Management Program Update
Section Description Inventory
Local Network
Sorted by Name
Street ID Street Name
Section
ID Beg Location End Location Functional Class
Surface
Type
# Lanes Length
(LF)
Width
(LF) Last Treatment Date Last Treatment PCI Date PCI
RUSRD RUSTIC RD 01 EL CAJON AVE END CDS R AC 2 176 33 10/2/2018 Slurry Seal 1/16/2026 50 RUTLDR RUTLAND DR 01 CUMBERLAND CIR DURHAM DR R AC 2 663 33 10/1/2013 Cape Seal 12/4/2025 70 RVNNA RAVENNA DR 01 MALAGA LN CORDOVA DR R AC 2 763 36 10/1/2019 Slurry Seal 1/16/2026 58 RVNSWD RAVENSWOOD DR 01 FAIRMONT BLVD END CDS R AC/AC 2 735 33 10/1/2023 AC Overlay 12/2/2025 100 SAGDR SAGA DR 01 PROSPECT AVE SANTA FE ST R AC 2 790 33 7/1/2009 Slurry Seal 10/31/2025 78 SAGDR SAGA DR 02 ROSE DR PROSPECT AVE R AC 2 1,109 33 10/2/2018 Slurry Seal 10/31/2025 77 SANDORD SANDOLO RD 01 ZAHARIAS RIDGE CDS R AC 2 331 33 10/2/2018 Slurry Seal 11/18/2025 70 SANFEST SANTA FE ST 01 END ORANGE DR R AC 2 880 37 10/2/2018 Slurry Seal 2/9/2026 39 SANFEST SANTA FE ST 02 ORANGE DR YORBA LINDA BLVD R AC 2 1,217 37 10/2/2018 Slurry Seal 10/31/2025 78 SANFEST SANTA FE ST 03 YORBA LINDA BLVD CITY LIMIT R AC/AC 2 995 33 3/27/2021 AC Overlay 12/3/2025 96 SANPABCR SAN PABLO CIRCLE 01 LA ENTRADA DR END CDS R AC 2 277 33 10/1/2019 Slurry Seal 11/11/2025 79 SANROCI SAND ROCK CIRCLE 01 OAK BURL DR END CDS R AC 2 277 33 10/2/2018 Slurry Seal 10/30/2025 73 SANRUFCI SAN RUFINO CIRCLE 01 LA ENTRADA DR END CDS R AC 2 288 31 10/1/2019 Slurry Seal 11/11/2025 78 SANSMNCI SAN SIMEON CIRCLE 01 LA ENTRADA DR END CDS R AC 2 318 31 10/1/2019 Slurry Seal 11/11/2025 75 SARAFLN SAN RAFAEL LN 01 VALLEY VIEW CIR SANTA CLARA CT R AC 2 314 36 10/2/2018 Slurry Seal 11/4/2025 78 SARATST SARATOGA ST 01 CUMBERLAND CIR CASCADES AVE R AC 2 669 33 11/1/2012 AC Overlay 12/4/2025 77 SARAZCT SARAZEN CT 01 ZAHARIAS RIDGE CDS R AC 2 626 33 10/2/2018 Slurry Seal 11/18/2025 72 SCHST SCHOOL ST 01 LEMON DR ARROYO ST R AC 2 516 27 10/1/2019 Slurry Seal 2/3/2026 100 SCHST SCHOOL ST 02 RIO DE PLATA DR RIO DE ORO DR R AC 2 362 33 10/1/2019 Slurry Seal 11/11/2025 65 SCHST SCHOOL ST 03 AVOLINDA DR PIPER PL R AC 2 356 33 10/1/2019 Slurry Seal 11/11/2025 77 SCNCVW SCENIC VIEW DR 01 OHIO ST BUENA VISTA AVE R AC 2 1,118 33 5/28/2021 Slurry Seal 12/15/2025 77 SCNDST SECOND ST 01 CHESTNUT ST MARDA AVE R AC 2 1,285 37 10/2/2018 Slurry Seal 11/7/2025 68 SCNDST SECOND ST 02 MARDA AVE LOS ANGELES ST R AC 2 630 37 10/2/2018 Slurry Seal 11/7/2025 81 SCOPIRID SCOTCH PINE RIDGE 01 SUMMER OAK PL MAJESTIC CYPRESS WAY R AC 2 511 33 5/28/2021 Slurry Seal 12/3/2025 62 SDDLTREELN SADDLETREE LANE 01 PEPPERTREE LANE END CDS R AC 2 1,720 33 1/24/2022 Slurry Seal 12/17/2025 74 SEABISCTRN SEABISCUIT RUN 01 WEST CDS EAST CDS R AC 2 1,732 38 10/1/2019 Slurry Seal 11/17/2025 71 SECRETWY SECRETARIAT WY 01 BASTANCHURY RD CDS R AC 2 1,126 38 10/1/2019 Slurry Seal 11/17/2025 70 SEMIWY SEMINOLE WAY 01 RICHFIELD RD END CDS R AC 2 712 33 5/28/2021 Slurry Seal 12/15/2025 61 SEQUOCI SEQUOIA CIRCLE 01 JOSHUA DR END CDS R AC 2 148 33 10/1/2019 Slurry Seal 1/16/2026 66 SGVIA SEGOVIA LN 01 CASIANO DR END OF CDS R AC 2 325 33 10/1/2019 Slurry Seal 11/13/2025 87 SHADEPL SHAY DEL PL 01 TRAIL VIEW PL END CDS R AC 2 287 33 5/28/2021 Slurry Seal 12/15/2025 94 SHALN SHARON CIRCLE 01 KAYE LN END CDS R AC 2 159 33 10/1/2019 Slurry Seal 11/11/2025 78 SHANWY SHANE WAY 01 RICH HILL WAY CASSON DR R AC 2 309 33 5/28/2021 Slurry Seal 12/10/2025 65 SHDWOK SHADOW OAK DR 01 FAIRMONT BLVD FOXHOLLOW DR R AC/AC 2 979 27 10/1/2023 AC Overlay 12/2/2025 100 SHDYCRKLNE SHADY CREEK LANE 01 BRUSH CANYON DR END OF CDS R AC/AC 2 367 33 7/1/2024 AC Overlay 10/11/2023 100 SHDYGLNPL SHADY GLEN PL 01 FAIRMONT BLVD END OF CDS R AC 2 319 33 1/24/2022 Slurry Seal 2/11/2026 56 SHDYMDWLN SHADY MEADOW LN 01 GREEN MEADOW WAY END OF CDS R AC 2 249 33 7/1/2016 Slurry Seal 10/11/2023 65 SHEEHST SHEEHAN ST 01 WATSON WY NICKLAUS RD R AC 2 388 33 10/2/2018 Slurry Seal 11/18/2025 70 SHKRI SHAKARI DR 01 LONG BAY END CDS R AC 2 825 27 3/31/2023 Slurry Seal 12/15/2025 85 SHLN SHAW LN 01 PARK AVE END R AC 2 412 14 10/1/2019 Slurry Seal 2/3/2026 44 SHRTST SHORT ST 01 CITY LIMITS RIDGE WAY R AC 2 875 27 5/28/2021 Slurry Seal 12/15/2025 74 SHRTST SHORT ST 02 RIDGE WAY OHIO R AC 2 770 33 5/28/2021 Slurry Seal 12/15/2025 80 SHRTST SHORT ST 03 OHIO END OF CDS R AC 2 330 33 5/28/2021 Slurry Seal 12/15/2025 87 SHRWD SHERWOOD DR 01 RIM CREST END CDS R AC/AC 2 536 29 12/1/2022 2" Grind & Cap 12/2/2025 90 SHTLNDLN SHETLAND LN 01 DAPPLE GRAY LN CDS R AC 2 591 33 10/2/2018 Slurry Seal 11/19/2025 89 SIENNA SIENNA LN 01 ORLANDO DR GRANADA DR R AC/AC 2 668 36 3/30/2023 AC Overlay 11/13/2025 96 SILMAPDR SILVER MAPLE DR 01 NORTH CDS SOUTH CDS R AC 2 532 34 10/2/2018 Slurry Seal 2/6/2026 79 SILVDLRWY SILVER DOLLAR WY 01 BLACK WALNUT CT BIG OAK LN R AC 2 192 33 10/2/2018 Slurry Seal 11/3/2025 82 A - Arterials, C - Collectors, O - Alleyways, R - Residentials, U - Urban Principal Arterials AC - Asphalt Concrete, AC/AC - Asphalt Concrete Overlay of existing Asphalt Concrete, ST - Surface Treatment Page 881 of 1224 17 of 25 4/29/2026 City of Yorba Linda
2026 Pavement Management Program Update
Section Description Inventory
Local Network
Sorted by Name
Street ID Street Name
Section
ID Beg Location End Location Functional Class
Surface
Type
# Lanes Length
(LF)
Width
(LF) Last Treatment Date Last Treatment PCI Date PCI
SILVSPLN SILVER SPURS LN 01 LOS PALOMINOS DR BUCKSKIN CIRCLE R AC 2 260 33 10/1/2019 Slurry Seal 11/18/2025 79 SILVTIPCI SILVERTIP CIRCLE 01 VAN BUREN ST END CDS R AC/AC 2 437 33 3/27/2021 AC Overlay 12/3/2025 90 SKYLN SKYLINE DRIVE E/S 01 MISSION HILLS LN END OF CDS R AC 2 533 33 10/2/2023 Slurry Seal 12/3/2025 77 SKYLNWS SKYLINE DRIVE W/S 01 MISSION HILLS END OF CDS R AC 2 243 33 10/2/2023 Slurry Seal 12/3/2025 86 SKYRDG SKYRIDGE DR 01 HIDDEN HILLS DR GREEN CREST R AC/AC 2 1,764 26 10/2/2023 Slurry Seal 12/3/2025 90 SLPNGOK SLEEPING OAK DR 01 WOODLAND AVE LOTUS AVE R AC 2 395 33 7/1/2009 Slurry Seal 10/9/2023 69 SMCRDGE SUMAC RIDGE 01 STONE CANYON END CDS R AC 2 540 33 1/24/2022 Slurry Seal 12/22/2025 84 SMKETREE SMOKETREE AVE 01 END CDS MANZANITA AVE R AC/AC 2 875 27 10/1/2023 AC Overlay 2/11/2026 94 SMKETREE SMOKETREE AVE 02 MANZANITA AVE JUNIPER AVE R AC/AC 2 972 33 10/1/2023 AC Overlay 12/1/2025 99 SMKYMTN SMOKEY MTN WAY 01 MT TRUMPH WAY ELK MTN WAY R AC/AC 2 2,935 33 7/1/2025 AC Overlay 10/10/2023 100 SMRVLLE SOMERVILLE CIR 01 WALNUT CREEK RD END CDS R AC 2 164 33 1/24/2022 Slurry Seal 12/17/2025 70 SNANTNIO SAN ANTONIO RD 01 YORBA LINDA BLVD VIA CORZO R AC/AC 2 397 50 10/1/2023 AC Overlay 12/2/2025 93 SNANTNIO SAN ANTONIO RD 02 VIA CORZO ALDER AVE R AC/AC 2 1,502 37 10/1/2023 AC Overlay 12/2/2025 99 SNANTNIO SAN ANTONIO RD 03 ALDER AVE VIEW PARK DR R AC/AC 2 2,141 37 10/1/2023 AC Overlay 12/2/2025 99 SNANTNIO SAN ANTONIO RD 04 VIEW PARK DR CASINO RIDGE RD R AC/AC 2 1,145 37 10/2/2023 AC Overlay 12/2/2025 100 SNANTNIO SAN ANTONIO RD 05 CASINO RIDGE RD FAIRMONT BLVD R AC 2 2,105 37 10/2/2023 Slurry Seal 12/2/2025 83 SNANTNIO SAN ANTONIO RD 06 FAIRMONT BLVD END CDS R AC 2 874 33 10/2/2023 Slurry Seal 12/2/2025 81 SNBM SUN BEAM RD 01 HIDDEN HILLS RD END OF CDS R AC 2 454 24 10/2/2023 Slurry Seal 1/30/2026 44 SNBRYCIR SUNBURY CIRCLE 01 SOUTHVIEW END CDS R AC 2 152 27 3/31/2023 Slurry Seal 1/29/2026 64 SNDSPNT SANDS POINT 01 STONE CANYON END CDS R AC 2 116 32 1/24/2022 Slurry Seal 12/22/2025 81 SNDYHLLLNE SANDY HILL LANE 01 ARROYO CAJON DR PARK SIDE DR R AC 2 1,227 33 1/24/2022 Slurry Seal 12/17/2025 76 SNGNWD SINGINGWOOD DR 01 FAIRMONT BLVD END CDS R AC/AC 2 753 33 10/1/2023 AC Overlay 12/2/2025 97 SNNYSDE SUNNY SIDE DR 01 RIM CREST DR END CDS R AC/AC 2 537 29 12/1/2022 2" Grind & Cap 12/2/2025 91 SNNYVW SUNNY VIEW CIR 01 GRAND VIEW AVE END OF CDS R AC 2 446 37 5/28/2021 Slurry Seal 12/22/2025 70 SNTAMRA VIA SANTA MARIA 01 VILLAGE CTR LONGBAY R AC 2 150 33 3/31/2023 Slurry Seal 12/15/2025 84 SNTNDR VIA SANTANDER 01 VIA SONADOR PASEO DE LAS PALOMAS R AC/AC 2 888 40 3/31/2023 AC Overlay 12/5/2025 100 SOHILLSWY SOUTHERN HILLS WY 01 LAKEVIEW AVE W HILLS WY R AC 2 388 33 10/1/2019 Slurry Seal 11/11/2025 82 SOHILLSWY SOUTHERN HILLS WY 02 LAKEVIEW AVE END CDS R AC 2 324 33 10/1/2019 Slurry Seal 11/11/2025 85 SOMERSRD SOMERSET RD 01 LAKEVIEW AVE SPYGLASS HILL R AC 2 305 37 10/2/2018 Slurry Seal 11/19/2025 70 SONOWY SONOMA WAY 01 TRAIL VIEW PL JAY ST R AC 2 377 33 5/28/2021 Slurry Seal 12/15/2025 97 SOUPTELN SOUTHERN POINTE LN 01 SOUTHERN HILLS WY END CDS R AC 2 231 33 10/1/2019 Slurry Seal 11/11/2025 88 SPRNGOK SPRING OAK 01 VIEW PARK DR END CDS R AC 2 213 33 10/2/2023 Slurry Seal 12/2/2025 86 SPYGLASHIL SPYGLASS HILL 01 HOMESTEAD AVE DIAMOND HILL R AC 2 998 33 10/2/2018 Slurry Seal 11/19/2025 71 STACLCT SANTA CLARA CT 01 WEST CDS EAST CDS R AC 2 280 28 10/2/2018 Slurry Seal 2/6/2026 62 STACZCT SANTA CRUZ CT 01 SANTA RAFAEL LN END R AC 2 1,000 34 10/2/2018 Slurry Seal 2/2/2026 57 STAFFCI STAFFORD CIRCLE 01 VAN BUREN ST END CDS R AC 2 256 33 5/28/2021 Slurry Seal 12/9/2025 70 STEPLECWY STEEPLECHASE WY 01 FABELLA LN CLYDESDALE DR R AC 2 443 33 10/2/2018 Slurry Seal 11/19/2025 95 STEPLECWY STEEPLECHASE WY 02 CLYDESDALE DR CDS R AC 2 384 33 10/2/2018 Slurry Seal 11/19/2025 94 STHRLND SUTHERLAND DR 01 ROCKHAMPTON CT END OF CDS R AC 2 320 33 7/1/2024 Crack Seal + Slurry Seal 12/3/2025 81 STHVW SOUTHVIEW DR 01 EASTHILL DR END CDS R AC 2 978 33 3/31/2023 Slurry Seal 1/29/2026 53 STHWNDLNE SOUTHWIND LANE 01 BRUSH CANYON DR END OF CDS R AC/AC 2 265 33 7/1/2024 AC Overlay 10/11/2023 100 STNECNYN STONE CANYON AVE 01 WAGON WHEEL DR WAGON WHEEL DR R AC 2 1,320 33 1/24/2022 Slurry Seal 12/22/2025 82 STNECRSTLN STONECREST LANE 01 ARROYO CAJON DR END CDS R AC 2 611 33 1/24/2022 Slurry Seal 2/3/2026 67 STNEHRST STONEHURST PZ 01 CANYON DR END CDS R AC 2 557 33 1/24/2022 Slurry Seal 12/12/2025 77 STNWD STONEWOOD DR 01 HIDDEN HILLS RD ROLLING HILLS LN R AC 2 185 33 10/2/2023 Slurry Seal 12/3/2025 88 STONEHAVE STONEHAVEN 01 YORBA LINDA BLVD AVIEMORE DR E/S C AC 2 2,413 46 7/1/2024 Crack Seal + Slurry Seal 12/3/2025 57 STONEHAVE STONEHAVEN 02 AVIEMORE DR E/S HEATHERIDGE W/S C AC 2 793 46 7/1/2024 Crack Seal + Slurry Seal 12/3/2025 62 STONEHAVE STONEHAVEN 03 HEARHERIDGE W/S BLUE MOUNTIAN E/S C AC 2 1,422 37 7/1/2024 Crack Seal + Slurry Seal 2/3/2026 48 A - Arterials, C - Collectors, O - Alleyways, R - Residentials, U - Urban Principal Arterials AC - Asphalt Concrete, AC/AC - Asphalt Concrete Overlay of existing Asphalt Concrete, ST - Surface Treatment Page 882 of 1224 18 of 25 4/29/2026 City of Yorba Linda
2026 Pavement Management Program Update
Section Description Inventory
Local Network
Sorted by Name
Street ID Street Name
Section
ID Beg Location End Location Functional Class
Surface
Type
# Lanes Length
(LF)
Width
(LF) Last Treatment Date Last Treatment PCI Date PCI
STONEHAVE STONEHAVEN 04 BLUE MOUNTIAN E/S VIA DE LA ROCA C AC 2 600 46 7/1/2024 Crack Seal + Slurry Seal 2/3/2026 26 STRLGHT STARLIGHT DR 01 HIDDEN HILLS RD END OF CDS R AC 2 200 33 10/2/2023 Slurry Seal 12/3/2025 60 STRLNGBRDG STIRLINGBRIDGE CIR 01 STONEHAVEN DR END CDS R AC 2 318 33 7/1/2024 Crack Seal + Slurry Seal 2/2/2026 100 STRWD STARWOOD DR 01 MISSION HILLS LN END OF CDS R AC 2 422 33 10/2/2023 Slurry Seal 2/11/2026 43 SUFFCI SUFFOLK CIRCLE 01 RUTLAND DR END CDS R AC 2 90 33 10/1/2013 Cape Seal 12/4/2025 80 SUGPINDR SUGAR PINE DR 01 SUMMER OAK PL GREEN PINE WAY R AC 2 1,763 33 5/28/2021 Slurry Seal 12/3/2025 83 SUMMOAPL SUMMER OAK PL 01 SCOTCH PINE DR SCOTCH PINE RIDGE R AC 2 596 33 5/28/2021 Slurry Seal 12/3/2025 70 SUNHIRD SUN HILL DRIVE 01 HIGHLAND AVE SUN VIEW RD R AC 2 775 33 5/28/2021 Slurry Seal 12/17/2025 86 SUNKNCRL SUN KNOLL CIRCLE 01 END CDS SUN KNOLL DRIVE R AC 2 100 33 5/28/2021 Slurry Seal 12/17/2025 93 SUNKNDR SUN KNOLL DR 01 SUN VIEW RD HIGHLAND AVE R AC 2 964 33 5/28/2021 Slurry Seal 12/17/2025 92 SUNLN SUNNY LN 01 MARK LN END CDS R AC 2 668 33 10/1/2019 Slurry Seal 11/11/2025 62 SUNMST SUNMIST DR 01 ARROYO CAJON DR MOUNTAIN VIEW AVE R AC 2 1,570 33 1/24/2022 Slurry Seal 12/17/2025 72 SUNVWRD SUNVIEW ROAD 01 SUN HILL ROAD SUN KNOLL DR R AC 2 700 33 5/28/2021 Slurry Seal 12/17/2025 87 SUNWECIRCL SUNWEST CIRCLE 01 VALLEY VIEW AVE END CDS R AC 2 467 37 10/2/2018 Slurry Seal 11/5/2025 78 SUSNNBRYNT SUSANNA BRYANT 01 RANCHO SANTA ANA POMEGRANATE R AC 2 220 33 7/1/2016 Slurry Seal 10/10/2023 86 SVLLA VIA SEVILLA 01 VIA BELARMINO END CDS R AC/AC 2 211 33 3/31/2023 AC Overlay 12/15/2025 100 SVRNCHPKWY SAVI RANCH PKWY 01 CITY BOUNDARY OLD CANAL RD C AC/AC 3 1,270 50 3/23/2023 2" Grind & Cap 10/19/2023 70 SVRNCHPKWY SAVI RANCH PKWY 02 OLD CANAL RD MIRAGE ST C AC/AC 4 1,397 44 3/24/2023 4" Grind & Cap 1/27/2022 100 SVRNCHPKWY SAVI RANCH PKWY 03 MIRAGE ST WEIR CANYON C AC/AC 4 860 44 3/23/2023 2" Grind & Cap 1/27/2022 100 SWTBYCT SWEET BAY CT 01 IRON BARK WY CDS R AC 2 203 33 10/2/2018 Slurry Seal 11/3/2025 84 SWTWTR SWEETWATER PL 01 FURANCE CREEK RD END CDS R AC 2 92 33 1/24/2022 Slurry Seal 12/17/2025 80 SYCAMCI SYCAMORE CIRCLE 01 AVOCADO AVE END CDS R AC 2 484 34 10/1/2019 Slurry Seal 1/16/2026 79 TEMHRSCT TEMHURST CT 01 OAKLAWN LN CDS R AC 2 310 32 10/2/2018 Slurry Seal 11/17/2025 83 TERLINLN TERRA LINDA LN 01 VAN BUREN ST HARVEST WAY R AC 2 120 33 5/28/2021 Slurry Seal 2/9/2026 62 TERRLN TERRACE LN 01 W HILLS WY END CDS R AC 2 217 33 10/1/2019 Slurry Seal 11/17/2025 80 THAGRDWY THAGARD WAY 01 GALLAL WAY E END CDS R AC 2 1,100 26 3/31/2023 Slurry Seal 12/17/2025 79 THICKLN THICKET LN 01 HARVEST WAY GROWERS CIRCLE R AC 2 288 33 5/28/2021 Slurry Seal 12/9/2025 75 THRD THIRD ST 01 WABASH AVE MARDA AVE R AC 2 1,593 42 10/2/2018 Slurry Seal 10/31/2025 75 THSLLDWN THISTLEDOWN CIR 01 ROCKHAMPTON CT END OF CDS R AC 2 476 37 7/1/2024 Crack Seal + Slurry Seal 12/3/2025 93 TIPPERCT TIPPERARY CT 01 JOEL BRATTAIN DR REDCASTLE ST R AC 2 311 33 10/2/2018 Slurry Seal 11/19/2025 70 TMBRRDG TIMBER RIDGE RD 01 FAIRMONT BLVD END CDS R AC/AC 2 995 33 10/1/2023 AC Overlay 12/2/2025 94 TMMRSK TAMARISK DR 01 MOUNTIAN VIEW AVE FIRCREST DR R AC/AC 2 508 33 3/27/2021 AC Overlay 12/8/2025 96 TODD TODD AVE 01 ROANOKE AVE GRANBY DR R AC 2 1,510 35 10/2/2023 Slurry Seal 12/6/2025 93 TORPINPL TORREY PINE PL 01 GREEN PINE WAY BRISTLE CONE LN R AC/AC 2 758 33 3/27/2021 AC Overlay 12/3/2025 97 TORWY TORIDA WAY 01 ORANGE DR END CDS R AC 2 484 37 10/2/2018 Slurry Seal 1/16/2026 50 TORWY TORIDA WAY 02 ORANGE DR FOLEY DR R AC 2 1,086 33 10/2/2018 Slurry Seal 11/6/2025 62 TORWY TORIDA WAY 03 LA KENICE WAY YORBA LINDA BLVD R AC/AC 2 559 33 3/27/2021 AC Overlay 12/3/2025 96 TRAIVIEPL TRAIL VIEW PL 01 SONOMA WAY RIDGECREST DR R AC 2 316 33 5/28/2021 Slurry Seal 12/15/2025 97 TRAIVIEPL TRAIL VIEW PL 02 RICHFIELD RD SEMINOLE WY R AC 2 933 33 5/28/2021 Slurry Seal 12/15/2025 97 TRAVISRD TRAVIS ROAD 01 PASEO DEO PRADO END R AC/AC 2 200 33 3/31/2023 AC Overlay 12/22/2025 97 TRENLN TRENTINO LN 01 FAIRMONT BLVD CORTONA CT R AC 2 1,424 37 N/A N/A 11/13/2025 88 TRLCRST TRAIL CREST LN 01 SADDLETREE LN END CDS R AC 2 629 27 1/24/2022 Slurry Seal 12/17/2025 74 TRLRDGE TRAIL RIDGE 01 SAN ANTONIO RD END CDS R AC/AC 2 208 27 10/1/2023 AC Overlay 2/11/2026 84 TRLSDDR TRAILSIDE DRIVE 01 DOMINGUEZ RANCH ROAD YORBA RANCH ROAD R AC/AC 2 770 33 10/1/2023 AC Overlay 12/17/2025 98 TRLSIDEDR TRAILSIDE DRIVE 01 YORBA RANCH ROAD VIA PERLA R AC/AC 2 550 33 10/1/2023 AC Overlay 12/17/2025 100 TROTLN TROTTER LN 01 WELSH PONY LN QUARTER HORSE DR R AC 2 1,271 32 10/2/2018 Slurry Seal 11/19/2025 77 TRX TRIX CIR 01 BASTANCHURY RD END CDS R AC 2 126 33 10/2/2018 Slurry Seal 11/7/2025 84 TUCST TUCANA ST 01 ORANGE DR END CDS R AC 2 360 33 10/2/2018 Slurry Seal 2/9/2026 70 A - Arterials, C - Collectors, O - Alleyways, R - Residentials, U - Urban Principal Arterials AC - Asphalt Concrete, AC/AC - Asphalt Concrete Overlay of existing Asphalt Concrete, ST - Surface Treatment Page 883 of 1224 19 of 25 4/29/2026 City of Yorba Linda
2026 Pavement Management Program Update
Section Description Inventory
Local Network
Sorted by Name
Street ID Street Name
Section
ID Beg Location End Location Functional Class
Surface
Type
# Lanes Length
(LF)
Width
(LF) Last Treatment Date Last Treatment PCI Date PCI
TULP TULIP CIR 01 GLOXINIA DR END CDS R AC/AC 2 101 33 10/1/2023 AC Overlay 1/30/2026 81 TURFWPK TURFWAY PK 01 FAIRPLEX DR CDS R AC 2 734 32 10/2/2018 Slurry Seal 11/13/2025 77 TUSWY TUSCANY WY 01 TRENTINO LN VOLTERRA LN R AC 2 352 33 N/A N/A 11/13/2025 89 TWNOK TWIN OAK 01 SAN ANTONIO RD END CDS R AC/AC 2 905 33 10/1/2023 AC Overlay 12/2/2025 89 TYNTRRCE TOYON TERRACE 01 COUNTRY VIEW DR END CDS R AC 2 76 33 1/24/2022 Slurry Seal 12/17/2025 70 UMBWY UMBRIA WY 01 TRENTINO LN CDS R AC 2 2,620 37 N/A N/A 11/13/2025 89 VALAVE VALENCIA AVE 01 LEMON DR END R AC 2 700 24 10/1/2019 Slurry Seal 11/11/2025 83 VALAVE VALENCIA AVE 02 RIO DE ORO RIO DE PLATA DR R AC 2 369 33 10/1/2019 Slurry Seal 11/11/2025 55 VALAVE VALENCIA AVE 03 PIPER PL END CDS R AC 2 94 33 10/1/2019 Slurry Seal 11/11/2025 79 VANBUR VAN BUREN ST 01 REGULUS DR YORBA LINDA BLVD R AC 2 465 33 10/2/2018 Slurry Seal 11/7/2025 84 VANBUR VAN BUREN ST 02 BUENA VISTA AVE YORBA LINDA BLVD R AC 2 3,031 40 5/28/2021 Slurry Seal 12/3/2025 83 VANBUR VAN BUREN ST 03 BUENA VISTA AVE CITY LIMIT R AC 2 2,020 40 5/28/2021 Slurry Seal 12/3/2025 79 VANBURCI VAN BUREN CIRCLE 01 VAN BUREN ST END CDS R AC 2 52 37 10/2/2018 Slurry Seal 11/7/2025 95 VAPEPTA VIA PEPITA 01 VILLAGE CENTER DR END CDS R AC/AC 2 1,375 33 10/1/2023 AC Overlay 12/3/2025 94 VARVERA VIA RIVERA 01 VIA DEL BUEY END OF CDS R AC 2 126 36 7/1/2016 Slurry Seal 12/18/2025 70 VERLN VERNA LN 01 ROSE DR END CDS R AC 2 236 33 10/2/2018 Slurry Seal 11/6/2025 67 VIA ALVAR VIA ALVARADO 01 DOMINGUEZ RANCH ROAD N N END CDS R AC/AC 2 70 33 10/1/2023 AC Overlay 1/30/2026 75 VIA CORON VIA CORONADO 01 PASEO RICO END CDS R AC/AC 2 320 33 10/1/2023 AC Overlay 12/17/2025 96 VIAADLA VIA ADELA 01 VISTA LAGUNA END CDS R AC/AC 2 303 33 1/20/2022 AC Overlay 1/8/2026 96 VIAAGSTO VIA AUGUSTO 01 END CDS VIA CERVANTES R AC 2 400 33 3/31/2023 Slurry Seal 1/29/2026 63 VIAALGRE VIA ALEGRE 01 AVENIDA DEL NORTE END CDS R AC 2 396 33 10/1/2019 Slurry Seal 11/12/2025 89 VIAALISA VIA ALISA 01 DOMINGUEZ RANCH ROAD W END CDS R AC/AC 2 325 33 10/1/2023 AC Overlay 12/17/2025 94 VIAALMRA VIA ALMERIA 01 VISTA DEL MAR END CDS R AC/AC 2 633 34 1/20/2022 AC Overlay 12/2/2025 84 VIAALVARA VIA ALVARADO 01 DOMINGUEZ RANCH ROAD S END CDS R AC/AC 2 305 33 10/1/2023 AC Overlay 12/17/2025 91 VIAAMNTE VIA AMANTE 01 VIA CONTENTO END CDS R AC/AC 2 462 33 10/1/2023 AC Overlay 2/2/2026 77 VIAAMRLLA VIA AMARILLA 01 AVENIDA DE LOS ARBOLES END CDS R AC 2 515 33 10/2/2023 Slurry Seal 12/3/2025 81 VIAARBLEDA VIA ARBOLEDA 01 LAKEVIEW AVE END OF CDS R AC 2 583 33 5/28/2021 Slurry Seal 12/15/2025 82 VIAARBLND VIA ARRIBA LINDA 01 VIA LOMAS DE YORBA W/S VIA BRAVO R AC 2 1,210 33 7/1/2016 Slurry Seal 10/9/2023 58 VIAASTRIS VIA ASTURIAS 01 VIA CERVANTES VIA BELARMINO R AC/AC 2 367 33 3/31/2023 AC Overlay 12/15/2025 99 VIAAZL VIA AZUL 01 AVENIDA DE LAS ESTRELLAS END CDS R AC 2 162 31 10/2/2023 Slurry Seal 12/3/2025 75 VIABDLMA VIA BADALONA 01 VISTA DEL MAR END CDS R AC/AC 2 431 34 1/20/2022 AC Overlay 12/2/2025 89 VIABERNCR VIA BERNARDO CIRCLE 01 VIA BERNARDO ROAD E END CDS R AC/AC 2 35 33 10/1/2023 AC Overlay 1/30/2026 87 VIABERNRD VIA BERNARDO 01 DOMINGUEZ RANCH RD W N END CDS R AC/AC 2 615 33 10/1/2023 AC Overlay 12/17/2025 98 VIABLRMNO VIA BELARMINO 01 VIA ASTURIAS AVENIDA EL CID R AC/AC 2 776 33 3/31/2023 AC Overlay 12/15/2025 100 VIABNSRT VIA BUENA SUERTE 01 END OF CDS VIA VALLARTA R AC 2 1,238 37 7/1/2016 Slurry Seal 10/19/2023 56 VIABRGSWS VIA BURGOS 01 VISTA DEL MAR W END CDS R AC/AC 2 700 33 1/24/2022 Slurry Seal 12/2/2025 84 VIABRGSWS VIA BURGOS 02 VISTA DEL MAR E END CDS R AC 2 200 33 7/1/2015 Slurry Seal 12/2/2025 84 VIABRMSA VIA BRUMOSA 01 VIA AZAFRAN VIA DEL PALMAR R AC 2 1,092 33 3/31/2023 Slurry Seal 12/5/2025 78 VIABRVE VIA BREVE 01 AVE DE AMOR VISTA DEL AMIGO R AC/AC 2 419 33 3/31/2023 AC Overlay 12/5/2025 100 VIABRVO VIA BRAVO 01 VIA ARRIBA LINDA VIA VERANO R AC 2 767 33 7/1/2016 Slurry Seal 10/9/2023 68 VIACANRS VIA CANARIAS 01 VISTA DEL MAR END CDS R AC 2 687 33 1/24/2022 Slurry Seal 12/2/2025 84 VIACBZA VIA CABEZA 01 VIA PEPITA END CDS R AC 2 98 33 10/2/2023 Slurry Seal 12/3/2025 68 VIACERSA VIA CERESA 01 VIA MADERA END OF CDS R AC/AC 2 236 33 3/27/2021 AC Overlay 12/15/2025 95 VIACLSTNA VIA CELESTINA 01 VISTA DEL MAR END CDS R AC/AC 2 1,259 33 1/20/2022 AC Overlay 2/11/2026 75 VIACMPNAS VIA CAMPANAS 01 VIA AZAFRAN END CDS R AC/AC 2 263 33 3/31/2023 AC Overlay 12/5/2025 100 VIACMPO VIA DE CAMPO 01 PASEO DE TORONTO VIA LEONARDO R AC 2 930 33 7/1/2016 Slurry Seal 10/9/2023 60 VIACNTDA VIA CANTADA 01 PASEO DE TORONTO VIA BUENA SUERTE R AC/AC 2 1,125 37 7/1/2025 AC Overlay 10/17/2023 100 VIACNTNTWS VIA CONTENTO 01 VIA CORZO VIA CASCO R AC/AC 2 758 33 10/1/2023 AC Overlay 12/2/2025 95 A - Arterials, C - Collectors, O - Alleyways, R - Residentials, U - Urban Principal Arterials AC - Asphalt Concrete, AC/AC - Asphalt Concrete Overlay of existing Asphalt Concrete, ST - Surface Treatment Page 884 of 1224 20 of 25 4/29/2026 City of Yorba Linda
2026 Pavement Management Program Update
Section Description Inventory
Local Network
Sorted by Name
Street ID Street Name
Section
ID Beg Location End Location Functional Class
Surface
Type
# Lanes Length
(LF)
Width
(LF) Last Treatment Date Last Treatment PCI Date PCI
VIACNTNTWS VIA CONTENTO 02 VIA CORZO END CDS R AC 2 111 33 10/2/2023 Slurry Seal 2/2/2026 70 VIACOTA VIA COTA 01 DOMINGUEZ RANCH ROAD W END CDS R AC/AC 2 100 33 10/1/2023 AC Overlay 12/17/2025 96 VIACRNA VIA CORONA 01 FELIPA RD END CDS R AC 2 722 33 10/2/2023 Slurry Seal 12/27/2025 95 VIACRRTS VIA CARRETAS 01 VIA AZAFRAN END CDS R AC/AC 2 314 33 3/31/2023 AC Overlay 12/5/2025 100 VIACRSTL VIA CRISTAL 01 VILLAGE CENTER DR END CDS R AC/AC 2 412 33 3/31/2023 AC Overlay 12/5/2025 98 VIACRVNTNS VIA CERVANTES S/S 01 VIA AGUSTO AVENIDA EL CID R AC 2 1,070 33 3/31/2023 Slurry Seal 12/15/2025 77 VIACRVNTNS VIA CERVANTES N/S 02 AVENIDA EL CID VIA ASTURIAS R AC 2 653 33 3/31/2023 Slurry Seal 1/29/2026 39 VIACRZO VIA CORZO 01 ALDER AVE SAN ANTONIO RD R AC/AC 2 1,788 37 10/1/2023 AC Overlay 12/2/2025 97 VIACSCOES VIA CASCO 01 VIA PIEDRA END CDS R AC/AC 2 177 33 10/1/2023 AC Overlay 12/2/2025 93 VIACSCOES VIA CASCO 02 VIA CONTENTO VIA PIEDRA R AC/AC 2 250 33 10/1/2023 AC Overlay 12/2/2025 97 VIACSTLE VIA CASTILE 01 VIA SANTANDER END CDS R AC 2 300 33 3/31/2023 Slurry Seal 1/29/2026 58 VIACSTLLN VIA CASTELLON 01 VIA CARTAGENA END CDS R AC/AC 2 161 33 3/31/2023 AC Overlay 12/5/2025 99 VIADEGO VIA DIEGO 01 VIA TOLEDO END CDS R AC 2 700 33 3/31/2023 Slurry Seal 12/6/2025 91 VIADELAARD VIA DE LA ARDILLA 01 VIA DEL GAVILLAN VIA DEL VENADO R AC/AC 2 230 30 3/31/2023 AC Overlay 12/22/2025 95 VIADELACER VIA DEL ACERO 01 VIA DE LA ESCUELA N END CDS R AC/AC 2 225 33 10/1/2023 AC Overlay 2/11/2026 81 VIADELAESC VIA DE LA ESCUELA 01 DOMINGUEZ RANCH ROAD YORBA LINDA BLVD. R AC/AC 2 880 34 10/1/2023 AC Overlay 12/18/2025 89 VIADELAGUI VIA DEL AGUILA 01 VIA DEL COYOTE END CDS R AC/AC 2 230 33 3/31/2023 AC Overlay 12/18/2025 100 VIADELARCA VIA DE LA ROCA 01 VIA DE LA AGUA END CDS R AC 2 100 31 7/1/2024 Crack Seal + Slurry Seal 2/2/2026 87 VIADELARTA VIA DE LA REATA 01 VIA DEL AGUA END CDS R AC 2 127 33 7/1/2024 Crack Seal + Slurry Seal 2/2/2026 82 VIADELBIS VIA DEL BISONTE 01 VIA DEL CAZADOR VIA DEL COYOTE R AC/AC 2 930 34 3/31/2023 AC Overlay 12/18/2025 99 VIADELCAZA VIA DEL CAZADOR 01 ESPERANZA ROAD DOMINGUEZ RANCH ROAD R AC 2 1,365 37 3/31/2023 Slurry Seal 12/18/2025 85 VIADELCOY VIA DEL COYOTE 01 VIA DEL BISONTE VIA DEL CUERVO R AC/AC 2 1,200 34 3/31/2023 AC Overlay 12/18/2025 100 VIADELCRRL VIA DEL CORRAL 01 VIA DEL AGUA END CDS R AC 2 591 33 7/1/2024 Crack Seal + Slurry Seal 2/2/2026 58 VIADELCUER VIA DEL CUERVO 01 VIA DEL COYOTE END CDS R AC/AC 2 340 33 3/31/2023 AC Overlay 12/18/2025 100 VIADELFIER VIA DEL FIERRO 01 VIA DE LA ESCUELA N END CDS R AC/AC 2 500 33 10/1/2023 AC Overlay 1/29/2026 88 VIADELGAV VIA DEL GAVILAN 01 VIA DEL CONEJO VIA DEL BISONTE R AC/AC 2 435 33 3/31/2023 AC Overlay 12/18/2025 100 VIADELHAL VIA DEL HALCON 01 VIA DEL COYOTE END CDS R AC/AC 2 320 33 3/31/2023 AC Overlay 12/18/2025 100 VIADELLN VIA DEL LEON 01 VILLAGE CENTER DR VIA DE LA MULA R AC 2 151 36 7/1/2016 Slurry Seal 12/18/2025 89 VIADELPAR VIA DEL PARQUE 01 DOMINGUEZ RANCH ROAD S END CDS R AC 2 1,630 34 10/2/2023 Slurry Seal 12/18/2025 87 VIADELPOTR VIA DEL POTRERO 01 VIA DEL VENADO END CDS R AC/AC 2 380 33 3/31/2023 AC Overlay 12/18/2025 100 VIADELPUMA VIA DEL PUMA 01 VIA DEL COYOTE END CDS R AC 2 265 33 3/31/2023 Slurry Seal 1/29/2026 46 VIADELTECO VIA DEL TECOLOTE 01 VIA DEL BASONTE END CDS R AC/AC 2 300 33 3/31/2023 AC Overlay 12/18/2025 100 VIADELVENA VIA DEL VENADO 01 VIA DEL CONEJO VIA DEL POTRERO R AC/AC 2 150 33 3/31/2023 AC Overlay 12/18/2025 100 VIADIANZA VIA DIANZA 01 DOMINGUEZ RANCH RD VIA ONTIVEROS R AC/AC 2 585 33 10/1/2023 AC Overlay 2/11/2026 82 VIADIEGOCI VIA DIEGO CIRCLE 01 VIA DIEGO END CDS R AC 2 120 33 3/31/2023 Slurry Seal 12/6/2025 88 VIADLAGA VIA DEL AGUA 01 VIA DE LA ROCA YORBA LINDA BLVD C AC 2 1,417 37 7/1/2024 Crack Seal + Slurry Seal 2/3/2026 14 VIADLCNEA VIA DULCINEA 01 VIA MARWAH END CDS R AC/AC 2 152 33 3/31/2023 AC Overlay 12/5/2025 100 VIADLCRRO VIA DEL CERRO 01 END CDS END CDS R AC 2 1,244 33 7/1/2024 Crack Seal + Slurry Seal 1/16/2026 76 VIADLESPLA VIA DE LA ESPUELA 01 VIA DEL AGUA END CDS R AC 2 100 33 7/1/2024 Crack Seal + Slurry Seal 12/3/2025 68 VIADLPNTE VIA DEL PUENTE 01 VIA DEL AGUA VIA DEL CERRO R AC 2 300 33 7/1/2024 Crack Seal + Slurry Seal 1/16/2026 81 VIADLR VIA DEL RIO 01 LA PALMA END OF CDS R AC 2 776 33 7/1/2016 Slurry Seal 10/19/2023 70 VIADNIEL VIA DANIEL 01 VISTA LAGUNA END CDS R AC/AC 2 505 33 1/20/2022 AC Overlay 1/8/2026 97 VIADNLDO VIA DONALDO 01 VISTA MONTANA END CDS R AC/AC 2 642 33 1/20/2022 AC Overlay 1/8/2026 98 VIAELTAVO VIA EL TAJO 01 VISTA DEL MAR E END CDS R AC 2 440 33 1/24/2022 Slurry Seal 12/2/2025 78 VIAESCBA VIA ESCOBA 01 VIA MARWAH END CDS R AC 2 163 33 3/31/2023 Slurry Seal 12/5/2025 57 VIAESPNA VIA ESPANA 01 VIA NAVARRA VILLAGE CENTER DR R AC 2 250 36 7/1/2016 Slurry Seal 2/2/2026 64 VIAESPNA VIA ESPANA 02 VIA LOURDES VILLAGE CENTER DR R AC/AC 2 600 33 10/1/2023 AC Overlay 12/3/2025 97 VIAESTE VIA ESTE 01 PABLO ROAD E END CDS R AC/AC 3 220 33 10/1/2023 AC Overlay 12/18/2025 94 A - Arterials, C - Collectors, O - Alleyways, R - Residentials, U - Urban Principal Arterials AC - Asphalt Concrete, AC/AC - Asphalt Concrete Overlay of existing Asphalt Concrete, ST - Surface Treatment Page 885 of 1224 21 of 25 4/29/2026 City of Yorba Linda
2026 Pavement Management Program Update
Section Description Inventory
Local Network
Sorted by Name
Street ID Street Name
Section
ID Beg Location End Location Functional Class
Surface
Type
# Lanes Length
(LF)
Width
(LF) Last Treatment Date Last Treatment PCI Date PCI
VIAESTNC VIA ESTANCIA 01 VIA FRANCISCO END CDS R AC/AC 2 254 33 3/31/2023 AC Overlay 12/6/2025 96 VIAESTR VIA ESTER 01 VISTA LAGUNA END CDS R AC/AC 2 452 33 1/20/2022 AC Overlay 1/29/2026 80 VIAFRNCSCO VIA FRANCISCO 01 VIA DIEGO VIA ESTANCIA R AC/AC 2 280 33 3/31/2023 AC Overlay 12/6/2025 96 VIAGDLUPE VIA GUADALUPE 01 VISTA DEL MAR END CDS R AC 2 1,362 33 1/24/2022 Slurry Seal 12/2/2025 82 VIAGRLDNA VIA GERALDINA 01 VISTA LAGUNA END CDS R AC/AC 2 434 33 1/20/2022 AC Overlay 1/29/2026 82 VIAHBNA VIA HABANA 01 VISTA DEL MAR END CDS R AC 2 517 33 1/24/2022 Slurry Seal 2/11/2026 44 VIAINFNTA VIA INFANTA 01 VISTA DEL MAR END CDS R AC 2 153 33 1/24/2022 Slurry Seal 12/2/2025 69 VIAINGRSO VIA INGRESO 01 PONTO DE VISTA PASEO DE LAS PALOMAS R AC/AC 2 740 33 3/31/2023 AC Overlay 12/5/2025 95 VIAISBLLA VIA ISABELLA 01 VIA MARWAH END CDS R AC/AC 2 284 33 1/20/2022 AC Overlay 1/8/2026 94 VIAJRDN VIA JARDIN 01 VISTA DEL AMIGO END CDS R AC 2 337 33 3/31/2023 Slurry Seal 1/29/2026 53 VIALAMANCH VIA LA MANCHA 01 VIA DEL BUEY E END CDS R AC 2 410 33 7/1/2016 Slurry Seal 2/2/2026 58 VIALANAR VIA LA NARANJA 01 VIA PEPITA W END CDS R AC/AC 2 625 33 10/1/2023 AC Overlay 12/3/2025 95 VIALAVJA VIA LA VIEJA 01 VISTA DEL MAR END CDS R AC/AC 2 743 34 1/20/2022 AC Overlay 12/2/2025 90 VIALCIA VIA LUCIA 01 VIA MARWAH END CDS R AC/AC 2 193 33 1/20/2022 AC Overlay 1/8/2026 99 VIALMSDYRB VIA LOMAS DE YORBA 01 RR BRIDGE S/S LA PALMA N/S R AC/AC 2 678 54 7/1/2025 AC Overlay 10/20/2023 100 VIALMSDYRB VIA LOMAS DE YORBA 02 RR BRIDGE N/S PASEO DE TORONTO S/S R AC/AC 2 1,578 54 7/1/2025 AC Overlay 10/20/2023 100 VIALMSDYRB VIA LOMAS DE YORBA 03 PASEO DE TORONTO N/S AVE DE MARCIA W/S R AC/AC 2 3,310 36 7/1/2025 AC Overlay 10/20/2023 100 VIALMSDYRB VIA LOMAS DE YORBA 04 AVE DE MARCIA W/S BOX CANYON CT W/S R AC/AC 2 1,588 36 7/1/2025 AC Overlay 10/20/2023 100 VIALMSDYRB VIA LOMAS DE YORBA 05 BOX CANYON CT W/S COPPER CANYON N/S R AC/AC 2 1,063 36 7/1/2025 AC Overlay 10/20/2023 100 VIALMSDYRB VIA LOMAS DE YORBA 06 COPPER CANYON N/S LA PALMA R AC/AC 2 762 33 7/1/2025 AC Overlay 10/19/2023 100 VIALNRDO VIA LENARDO 01 CAMINO VISTA VIA ARRIBA LINDA R AC 2 2,435 35 7/1/2016 Slurry Seal 10/9/2023 56 VIALNRS VIA LINARES 01 VISTA DEL MAR END CDS R AC 2 303 33 1/24/2022 Slurry Seal 12/2/2025 84 VIALRDA VIA LERIDA 01 VISTA DEL MAR END CDS R AC/AC 2 422 33 1/20/2022 AC Overlay 12/2/2025 86 VIALRDES VIA LOURDES 01 VIA LA NARANJA VIA ESPANA R AC/AC 2 267 27 10/1/2023 AC Overlay 12/3/2025 92 VIALSBRS VIA LAS BRISAS 01 VIA LOMAS DE YORBA CAMINO DORADO R AC 2 698 37 7/1/2016 Slurry Seal 10/19/2023 60 VIALSVLLS VIA LAS VILLAS 01 VISTA DEL MAR END CDS R AC 2 562 34 1/24/2022 Slurry Seal 12/2/2025 76 VIALUGO VIA LUGO 01 DOMINGUEZ RANCH ROAD W END CDS R AC/AC 2 170 33 10/1/2023 AC Overlay 12/17/2025 92 VIAMARC VIA MARCOS 01 CARLOS ROAD END CDS R AC/AC 2 685 33 10/1/2023 AC Overlay 12/22/2025 96 VIAMARI VIA MARIPOSA 01 AVENIDA ANTIGUA END CDS R AC/AC 2 2,300 34 3/31/2023 AC Overlay 12/18/2025 98 VIAMDRA VIA MADERA 01 LAKEVIEW AVE END OF CDS R AC/AC 2 683 33 3/27/2021 AC Overlay 12/15/2025 96 VIAMDRD VIA MADRID 01 VIA PAMPLONA VIA DEL BUEY R AC 2 400 33 7/1/2016 Slurry Seal 2/2/2026 68 VIAMGDLNA VIA MAGDALENA 01 VISTA DEL MAR END CDS R AC 2 436 33 1/24/2022 Slurry Seal 12/2/2025 67 VIAMGRTA VIA MARGARITA 01 VISTA LAGUNA END CDS R AC/AC 2 390 33 1/20/2022 AC Overlay 1/8/2026 87 VIAMGUEL VIA MIGUEL 01 VIA ESPANA END CDS R AC 2 370 33 7/1/2016 Slurry Seal 2/9/2026 54 VIAMLNDA VIA MELINDA 01 CAMINO FAMOSA VIA CANTADA R AC 2 770 37 7/1/2016 Slurry Seal 10/17/2023 58 VIAMNRSA VIA MANRESA 01 VISAT DEL MAR END CDS R AC 2 416 34 1/24/2022 Slurry Seal 12/2/2025 81 VIAMNZNLLO VIA MANZANILLO 01 VISTA DEL MAR END CDS R AC 2 992 34 1/24/2022 Slurry Seal 12/2/2025 72 VIAMONITA VIA MONITA 01 VIA MIRAMAR W END CDS R AC 2 1,150 34 1/24/2022 Slurry Seal 12/11/2025 94 VIAMRAMR VIA MIRAMAR 01 VISTA DEL MAR VIA NATILE R AC 2 293 33 1/24/2022 Slurry Seal 12/2/2025 96 VIAMRNO VIA MARIANO 01 FELIPA RD END OF CDS R AC/AC 2 261 33 10/1/2023 AC Overlay 12/3/2025 98 VIAMRSA VIA MARISA 01 VIA CORZO END CDS R AC/AC 2 385 33 10/1/2023 AC Overlay 2/11/2026 76 VIAMRWH VIA MARWAH E/S 01 VILLAGE CENTER DR VILLAGE CENTER DR R AC 2 3,021 42 3/31/2023 Slurry Seal 1/16/2026 58 VIAMRWHES VIA MARWAH W/S 01 VILLAGE CENTER DR VIA LUCIA R AC 2 560 38 1/24/2022 Slurry Seal 1/8/2026 87 VIAMRWHES VIA MARWAH W/S 02 VIA LUCIA VISTA MONTANA R AC 2 850 38 1/24/2022 Slurry Seal 1/8/2026 75 VIANGE VIA ANGELINA 01 S END CDS N END CDS R AC 2 814 33 1/24/2022 Slurry Seal 1/29/2026 51 VIANGE VIA ANGELINA 02 E END CDS W END CDS R AC 2 722 33 1/24/2022 Slurry Seal 1/8/2026 69 VIANIETS VIA NIETOS 01 YORBA RANCH END OF STREETS R AC 2 1,185 33 3/31/2023 Slurry Seal 2/11/2026 50 VIANORIE VIA NORIEGA 01 DOMINGUEZ RANCH ROAD W END CDS R AC/AC 2 450 33 10/1/2023 AC Overlay 1/30/2026 73 A - Arterials, C - Collectors, O - Alleyways, R - Residentials, U - Urban Principal Arterials AC - Asphalt Concrete, AC/AC - Asphalt Concrete Overlay of existing Asphalt Concrete, ST - Surface Treatment Page 886 of 1224 22 of 25 4/29/2026 City of Yorba Linda
2026 Pavement Management Program Update
Section Description Inventory
Local Network
Sorted by Name
Street ID Street Name
Section
ID Beg Location End Location Functional Class
Surface
Type
# Lanes Length
(LF)
Width
(LF) Last Treatment Date Last Treatment PCI Date PCI
VIANPLES VIA NOPALES 01 VIA MARWAH END CDS R AC 2 128 33 3/31/2023 Slurry Seal 12/5/2025 73 VIANTLIE VIA NATALIE 01 VIA MIRAMAR W END CDS R AC 2 1,000 33 1/24/2022 Slurry Seal 12/2/2025 95 VIANVA VIA NUEVA 01 CAMINO FAMOSA CAMINO TECATE R AC 2 209 33 7/1/2016 Slurry Seal 10/17/2023 69 VIANVRRA VIA NAVARRA 01 VIA DEL BUEY VIA ESPANA R AC 2 380 33 7/1/2016 Slurry Seal 2/9/2026 64 VIAOESTE VIA OESTE 01 PABLO ROAD W END CDS R AC/AC 2 170 33 10/1/2023 AC Overlay 12/18/2025 94 VIAONTIV VIA ONTIVEROS 01 VIA SEPULVEDA S END CDS R AC/AC 2 460 33 10/1/2023 AC Overlay 1/30/2026 83 VIAPDRA VIA PIEDRA 01 VIA CORZO YORBA LINDA BLVD R AC/AC 2 582 33 10/1/2023 AC Overlay 2/11/2026 85 VIAPERL VIA PERLA 01 TRAILSIDE DRIVE END CDS R AC 2 310 33 10/2/2023 Slurry Seal 12/17/2025 79 VIAPMPLNO VIA PAMPLONA 01 VIA ESPANA VIA MADRID R AC 2 233 33 7/1/2016 Slurry Seal 2/11/2026 65 VIAPRMRIA VIA PRIMARIA 01 END CDS VIA MARWAH R AC 2 1,496 33 3/31/2023 Slurry Seal 12/5/2025 80 VIAPSA VIA PASA 01 VISTA DEL MAR END CDS R AC/AC 2 133 33 1/20/2022 AC Overlay 12/2/2025 86 VIAPZRRO VIA PIZARRO 01 VIA DEL BUEY END CDS R AC 2 129 33 7/1/2016 Slurry Seal 12/18/2025 66 VIARCRDO VIA RICARDO 01 VISTA MONTANA END CDS R AC/AC 2 382 33 1/20/2022 AC Overlay 1/8/2026 97 VIARJA VIA ROJA 01 CALLE BONITA AVENIDA DE LOS SUENOS R AC/AC 2 720 33 10/1/2023 AC Overlay 12/3/2025 94 VIARMNNS VIA RAMON N/S 01 END CDS END CDS R ST 2 787 33 10/1/2023 Reconstruct Surface (ST) 12/17/2025 97 VIARMONES VIA RAMON E/S 01 YORBA RANCH RD VIA RAMON R ST 2 207 33 10/1/2023 Reconstruct Surface (ST) 12/17/2025 100 VIAROBLE VIA ROBLE 01 AVENIDA ANTIGUA CALLE ENTRADA R AC/AC 2 220 33 3/31/2023 AC Overlay 12/18/2025 100 VIAROSA VIA ROSA 01 DOMINGUEZ RANCH ROAD N END CDS R AC/AC 2 90 33 10/1/2023 AC Overlay 1/30/2026 76 VIASARA VIA SARA 01 VIA MONITA S END CDS R AC 2 110 26 1/24/2022 Slurry Seal 12/11/2025 96 VIASEPULV VIA SEPULVEDA 01 YORBA RANCH ROAD S END CDS R AC/AC 2 630 33 10/1/2023 AC Overlay 12/17/2025 95 VIASMUEL VIA SAMUEL 01 VISTA MONTANA END CDS R AC/AC 2 463 33 1/20/2022 AC Overlay 1/8/2026 97 VIASNDR VIA SONADOR 01 VIA CARTEGENA END CDS R AC 2 822 33 3/31/2023 Slurry Seal 1/29/2026 57 VIASNLCR VIA SAN LUCAR 01 VISTA DEL MAR END CDS R AC 2 888 34 1/24/2022 Slurry Seal 12/2/2025 76 VIASNRSA VIA SONRISA 01 PASEO DE LAS PALOMAS AVENIDA DE LOS REYES R AC/AC 2 463 33 3/31/2023 AC Overlay 12/6/2025 97 VIASNTMRNS VIA SANTA MARIA N/S 01 VILLAGE CENTER VISTA DEL MAR R AC 2 261 48 1/24/2022 Slurry Seal 12/2/2025 78 VIASNTNA VIA SANTANA 01 YORBA RANCH END OF STREETS R AC 2 1,376 33 3/31/2023 Slurry Seal 1/30/2026 72 VIASUSNH VIA SUSANNAH 01 AVENIDA EL CID END CDS R AC 2 182 33 3/31/2023 Slurry Seal 1/29/2026 57 VIATDOCIO VIA TEODOCIO 01 FELIPA RD END CDS R AC/AC 2 400 33 10/1/2023 AC Overlay 12/3/2025 99 VIATLEDO VIA TOLEDO 01 PASEO DE LAS PALOMAS VIA DIEGO R AC 2 482 33 3/31/2023 Slurry Seal 12/6/2025 83 VIATLVRA VIA TALAVERA 01 VISTA DEL MAR END CDS R AC 2 375 33 1/24/2022 Slurry Seal 1/16/2026 68 VIATLVRA VIA TALAVERA 02 VISTA DEL MAR END CDS R AC 2 610 33 1/24/2022 Slurry Seal 12/2/2025 73 VIATMS VIA TOMAS 01 DORINDA RD END OF CDS R AC/AC 2 262 32 10/1/2023 AC Overlay 12/3/2025 99 VIATNRIO VIA TENORIA 01 VISTA DEL MAR END CDS R AC 2 314 33 1/24/2022 Slurry Seal 12/2/2025 84 VIATPSTE VIA TAPASTE 01 VIA MARWAH END CDS R AC 2 224 33 3/31/2023 Slurry Seal 12/5/2025 73 VIATRHA VIA TARARA 01 VISTA DEL MAR END CDS R AC 2 452 33 1/24/2022 Slurry Seal 12/2/2025 79 VIATRNDAD VIA TRINIDAD 01 VIA MIGUEL END CDS R AC 2 478 33 7/1/2016 Slurry Seal 2/9/2026 64 VIATRRGNA VIA TARRAGONA 01 VISTA DEL MAR END CDS R AC/AC 2 828 34 1/20/2022 AC Overlay 12/2/2025 87 VIATRRLBA VIA TORRALBA 01 VISTA DEL MAR END CDS R AC/AC 2 324 34 1/20/2022 AC Overlay 12/2/2025 83 VIATRVDR VIA TROVADOR 01 VISTA DEL MAR END CDS R AC 2 745 33 1/24/2022 Slurry Seal 12/2/2025 91 VIAVGO VIA VIGO 01 VIA TALAVERA END CDS R AC 2 143 33 1/24/2022 Slurry Seal 12/2/2025 88 VIAVICENT VIA VICENTE 01 W END CDS E END CDS R AC/AC 2 600 33 10/1/2023 AC Overlay 12/17/2025 91 VIAVICENTE VIA VICENTE 01 YORBA RANCH ROAD VIA VICENTE R AC/AC 2 220 33 10/1/2023 AC Overlay 12/17/2025 98 VIAVLLRT VIA VALLARTA 01 END OF CDS VIA MELINDA R AC 2 1,872 37 7/1/2016 Slurry Seal 10/19/2023 58 VIAVNT VIA VIENTO 01 AVENIDA DE LOS ARBOLES END OF CDS R AC 2 270 33 10/2/2023 Slurry Seal 12/3/2025 72 VIAVNTSA VIA VENTOSA 01 CAMINO DE LOS CANTOS END CDS R AC/AC 2 333 33 3/31/2023 AC Overlay 12/6/2025 96 VIAVRDRO VIA VARADERO 01 VISTA DEL MAR END CDS R AC 2 588 33 1/24/2022 Slurry Seal 12/2/2025 81 VIAVRNO VIA VERANO 01 PASEO DE TORONTO VIA ARRIBA LINDA R AC 2 1,032 33 7/1/2016 Slurry Seal 10/9/2023 54 VIAVTNA VIA VENTANA 01 AVENIDA DE LOS REYES END CDS R AC/AC 2 301 33 3/31/2023 AC Overlay 12/6/2025 100 A - Arterials, C - Collectors, O - Alleyways, R - Residentials, U - Urban Principal Arterials AC - Asphalt Concrete, AC/AC - Asphalt Concrete Overlay of existing Asphalt Concrete, ST - Surface Treatment Page 887 of 1224 23 of 25 4/29/2026 City of Yorba Linda
2026 Pavement Management Program Update
Section Description Inventory
Local Network
Sorted by Name
Street ID Street Name
Section
ID Beg Location End Location Functional Class
Surface
Type
# Lanes Length
(LF)
Width
(LF) Last Treatment Date Last Treatment PCI Date PCI
VIAZOPPO VIA ZOPAPO 01 BALARMINO END CDS R AC/AC 2 229 33 3/31/2023 AC Overlay 12/15/2025 100 VIAZRGZA VIA ZARAGOZA 01 VISTA DEL MAR END CDS R AC/AC 2 782 33 1/20/2022 AC Overlay 12/2/2025 84 VIGLO VIA GLORIA 01 VISTA MONTANA VIA ANGELINA R AC 2 242 33 1/24/2022 Slurry Seal 1/8/2026 81 VIJUA VIA JUANA 01 VISTA MONTANA END CDS R AC/AC 2 341 33 1/20/2022 AC Overlay 1/8/2026 87 VINWOLN VINWOOD LN 01 VALLEY VIEW CIR HARLAN DR R AC 2 900 33 10/2/2018 Slurry Seal 11/3/2025 81 VISLAG VISTA LAGUNA 01 PASEO DE LAS PALOMAS VILLAGE CENTER DR C AC 2 2,740 24 1/24/2022 Slurry Seal 1/8/2026 89 VISLAG VISTA LAGUNA 02 VILLAGE CENTER DR PASEO DE LAS PALOMAS C AC 2 2,740 24 1/24/2022 Slurry Seal 1/8/2026 90 VISMEND VISTA MENDOZA 01 CAMINO CERMENON CDS R AC 2 560 33 7/1/2009 Slurry Seal 11/3/2025 75 VISMONT VISTA MONTANA 01 VISTA LAGUNA W/S VIA GLORIA S/S C AC 2 2,113 40 1/24/2022 Slurry Seal 1/8/2026 71 VISMONT VISTA MONTANA 02 VIA GLORIA S/S VISTA LAGUNA N/S C AC 2 2,337 40 1/24/2022 Slurry Seal 1/8/2026 84 VISMOR VISTA MORAGA 01 VALLEY VIEW CIR CAMINO CERMENON R AC 2 485 32 N/A N/A 11/3/2025 70 VISTLN VISTA LN 01 RANCHO LN END CDS R AC 2 120 33 10/2/2018 Slurry Seal 11/5/2025 82 VIVIRGI VIA VIRGINIA 01 VISTA MONTANA VIA ANGELINA R AC 2 243 33 1/24/2022 Slurry Seal 1/8/2026 73 VLLAGRNDE VILLA GRANDE DR 01 LA ENTRADA DR BASTANCHURY RD R AC 2 427 33 10/1/2019 Slurry Seal 11/7/2025 75 VLLGRCIR VILLAGER CIR 01 MANOR VIEW DR END CDS R AC/AC 2 430 33 1/20/2022 AC Overlay 2/11/2026 76 VNCIA VENECIA LN 01 ORLANDO DR END CDS R AC/AC 2 408 33 3/30/2023 AC Overlay 11/13/2025 96 VNGH VAN GOGH WAY 01 PICASSO DR DELACROIX WAY R AC 2 1,457 33 7/1/2016 Slurry Seal 10/10/2023 66 VOLTERLN VOLTERRA LN 01 TUSCANY WY CDS R AC 2 423 33 N/A N/A 11/13/2025 93 VRONA VERONA LN 01 CASIANO DR END CDS R AC 2 596 36 10/1/2019 Slurry Seal 11/13/2025 92 VSTADLAMGO VISTA DEL AMIGO 01 VIA JARDIN PUNTO DE VISTA R AC 2 1,207 33 3/31/2023 Slurry Seal 12/5/2025 74 VSTAGLN VISTA GLEN CIR 01 RIM CREST DR END CDS R AC/AC 2 938 29 12/1/2022 2" Grind & Cap 12/2/2025 93 VSTARNCH VISTA RANCH DR 01 EL CAJON AVE END CDS R AC 2 159 33 10/2/2018 Slurry Seal 11/6/2025 77 VSTAVIZ VISTA VIZCAINO 01 CAMINO CABRILLO CAMINO AYALA R AC 2 205 33 10/2/2018 Slurry Seal 1/16/2026 80 VSTCNTRA VISTA CANTORA 01 VIA ARRIBA LINDA END OF CDS R AC 2 859 33 7/1/2016 Slurry Seal 10/9/2023 55 VSTDLMREB VISTA DEL MAR E/B 01 PASEO DE LAS PALOMAS 80FT N OF VIA VADERO C AC 2 599 20 1/24/2022 Slurry Seal 12/11/2025 79 VSTDLMREB VISTA DEL MAR E/B 02 80 FT N OF VIA VARADERO 150 FT SO OF MANZANILLO C AC 2 1,688 20 1/24/2022 Slurry Seal 12/11/2025 70 VSTDLMREB VISTA DEL MAR E/B 03 150 FT S. OF MANZANILLO VIA LERIDA C AC 2 4,177 20 1/24/2022 Slurry Seal 12/11/2025 77 VSTDLMREB VISTA DEL MAR E/B 04 LERIDA VILLAGE CENTER C AC 2 891 20 1/24/2022 Slurry Seal 12/11/2025 78 VSTDLMRWB VISTA DEL MAR W/B 01 VILLAGE CENTER VIA LERDIA C AC 2 866 20 1/20/2022 Localized Inlay Overlay 12/11/2025 89 VSTDLMRWB VISTA DEL MAR W/B 02 LERIDA VIA SANLUCAR C AC 2 4,018 20 1/24/2022 Slurry Seal 12/11/2025 74 VSTDLMRWB VISTA DEL MAR W/B 03 VIA SANLUCAR VIA VARADERO 80FT N C AC 2 1,815 20 1/20/2022 Localized Inlay Overlay 1/29/2026 24 VSTDLMRWB VISTA DEL MAR W/B 04 VIA VARADERO 80FT N PASEO DE LAS PALOMAS C AC 2 535 20 1/20/2022 Localized Inlay Overlay 12/11/2025 66 VSTDLNRT VISTA DEL NORTE 01 AVE DE LOS ARBOLES END OF CDS R AC 2 561 33 10/2/2023 Slurry Seal 12/3/2025 86 VSTDLSL VISTA DEL SOL 01 END OF CDS AVENIDA DE LAS ESTRELLAS R AC/AC 2 1,151 33 10/1/2023 AC Overlay 12/3/2025 94 VSTLMPRA VISTA LAMPARA 01 VIASTA CANTORA CAMINO CALCUROSO R AC 2 341 33 7/1/2016 Slurry Seal 10/9/2023 70 VWPRK VIEW PARK DR 01 SAN ANTONIO RD END CDS R AC 2 1,154 37 10/2/2023 Slurry Seal 12/2/2025 98 WATSWY WATSON WY 01 BLACK GOLD DR HOGAN DR R AC 2 1,320 37 10/2/2018 Slurry Seal 11/18/2025 70 WBSH WABASH AVE 01 ROSE DR PROSPECT AVE C AC 2 1,461 33 3/23/2023 5" Deep Patch 10/30/2025 82 WBSH WABASH AVE 02 PROSPECT E/S THIRD ST R AC 2 1,262 42 10/2/2018 Slurry Seal 1/16/2026 58 WDCRST WOODCREST DR 01 YORBA LINDA BLVD KENNON DR R AC/AC 2 845 33 3/27/2021 AC Overlay 12/9/2025 97 WDHAVEN WOODHAVEN DR 01 MEADOWVIEW DR END CDS R AC 2 225 33 10/1/2019 Slurry Seal 11/5/2025 77 WDLND WOODLAND AVE 01 SLEEPING OAK DR FOXTAIL DR R AC 2 586 33 7/1/2016 Slurry Seal 10/9/2023 83 WEATHDR WEATHERLY DR 01 CASA LOMA AVE RAINBOW LN R AC 2 465 33 10/1/2019 Slurry Seal 11/11/2025 91 WEBPL WEBB PL 01 END CDS END CDS R AC 2 432 33 5/28/2021 Slurry Seal 12/3/2025 95 WELSPNYLN WELSH PONY LN 01 RED ROAN LN CDS R AC 2 840 30 10/2/2018 Slurry Seal 11/19/2025 71 WESMORDR WESTMORELAND DR 01 BUENA VISTA AVE CUMBERLAND CIR R AC 2 852 33 10/1/2013 Cape Seal 12/4/2025 70 WEYBUAV WEYBURN AVE 01 ROSE DR ODESSA DR R AC 2 295 33 10/2/2018 Slurry Seal 10/30/2025 70 WGNWHL WAGON WHEEL DR 01 STONE CANYON AVE STONE CANYON AVE R AC 2 1,300 33 1/24/2022 Slurry Seal 12/22/2025 80 A - Arterials, C - Collectors, O - Alleyways, R - Residentials, U - Urban Principal Arterials AC - Asphalt Concrete, AC/AC - Asphalt Concrete Overlay of existing Asphalt Concrete, ST - Surface Treatment Page 888 of 1224 24 of 25 4/29/2026 City of Yorba Linda
2026 Pavement Management Program Update
Section Description Inventory
Local Network
Sorted by Name
Street ID Street Name
Section
ID Beg Location End Location Functional Class
Surface
Type
# Lanes Length
(LF)
Width
(LF) Last Treatment Date Last Treatment PCI Date PCI
WHILLSWY W HILLS WY 01 SOUTHERN HILLS WY TERRACE LN R AC 2 382 33 10/1/2019 Slurry Seal 1/16/2026 77 WHTOK WHITE OAK DR 01 SCENIC VIEW DR END OF CDS R AC 2 651 33 5/28/2021 Slurry Seal 12/15/2025 63 WILLCIR WILLOW CIRCLE 01 RICH HILL WAY END CDS R AC/AC 2 345 33 3/27/2021 AC Overlay 12/10/2025 97 WINMERDR WINDMERE DR 01 BUENA VISTA AVE END CDS R AC 2 893 37 7/1/2004 Slurry Seal 12/4/2025 63 WINNRCIR WINNERS CIR 01 QUARTER HORSE DR CDS R AC 2 570 32 10/2/2018 Slurry Seal 11/19/2025 91 WINTHAVST WINTERHAVEN ST 01 END CDS CITY LIMIT R AC 2 538 33 10/2/2018 Slurry Seal 10/30/2025 70 WISTERDR WISTERIA DR 01 EUREKA AVE END CDS R AC 2 753 33 10/1/2019 Slurry Seal 11/5/2025 82 WLLOWTREE WILLOW TREE LN 01 ASPEN WAY END CDS R AC/AC 2 205 33 10/1/2023 AC Overlay 12/2/2025 94 WLLWWAY WILLOW WAY 01 RICH HILL WAY RICHFIELD ROAD R AC/AC 2 140 33 3/27/2021 AC Overlay 12/10/2025 97 WLNTCRK WALNUT CREEK RD 01 END CDS FURNACE CREEK RD R AC 2 836 33 1/24/2022 Slurry Seal 12/17/2025 73 WLNTLNE WALNUT LANE 01 BUENA VISTA AVE END CDS R AC 2 1,019 37 5/28/2021 Slurry Seal 12/15/2025 55 WLNTWS WALNUT ST 01 THIRD ST END CDS R AC 2 508 33 10/2/2018 Slurry Seal 2/6/2026 75 WLNTWS WALNUT ST 02 VALLEY VIEW AVE SECOND ST R AC 2 671 37 10/2/2018 Slurry Seal 11/4/2025 73 WLNTWS WALNUT ST 03 SECOND ST THIRD ST R AC 2 614 37 10/2/2018 Slurry Seal 11/4/2025 77 WNCHSTRLNE WINCHESTER LANE 01 SADDLETREE LANE SANDY HILL R AC 2 300 33 1/24/2022 Slurry Seal 12/17/2025 77 WNDSNGCIR WIND SONG CIR 01 RIM CREST DR END CDS R AC/AC 2 137 33 12/1/2022 2" Grind & Cap 12/2/2025 90 WNDYCIR WINDY CIRCLE 01 LOTUS AVE END OF CDS R AC 2 405 33 7/1/2016 Slurry Seal 10/9/2023 74 WOODCRCI WOODCREST CIRCLE 01 YORBA LINDA BLVD END CDS R AC/AC 2 88 33 7/1/2019 AC Overlay 11/5/2025 93 WSTWD WESTWOOD LN 01 STARLIGHT DR END OF CDS R AC 2 198 33 10/2/2023 Slurry Seal 1/30/2026 34 WTRFRD WATERFORD DR 01 DUNROBIN WAY END OF CDS R AC/AC 2 217 33 7/1/2024 Crack Seal + Slurry Seal 1/30/2026 55 YELOSTOAV YELLOWSTONE AVE 01 VAN BUREN ST RAINTREE ST R AC 2 688 33 5/28/2021 Slurry Seal 12/9/2025 62 YORKSHAV YORKSHIRE AVE 01 RAINTREE ST VAN BUREN ST R AC/AC 2 684 33 3/27/2021 AC Overlay 12/9/2025 97 ZAHARIDG ZAHARIAS RIDGE 01 LAKEVIEW AVE SARAZEN CT R AC 2 975 37 10/2/2018 Slurry Seal 11/18/2025 79 A - Arterials, C - Collectors, O - Alleyways, R - Residentials, U - Urban Principal Arterials AC - Asphalt Concrete, AC/AC - Asphalt Concrete Overlay of existing Asphalt Concrete, ST - Surface Treatment Page 889 of 1224 25 of 25 4/29/2026 Appendix 2
Work Plan per Scenario 1

Page 890 of 1224 ends