Exhibit A- FY 2024-25 Proposed Project List SB1: The Road Repair Accountability Act FY Proposed Title Description Location Components Est Start Est
Completion Est Useful Life Assembly Senate
24/25
Curb, Gutter
Sidewalk and or
ADA Ramp
Replacement
This project will include: Sidewalk and/or Crosswalk Installation (New), Cost Estimating, ADA Curb Ramp Rehab/Repair (Existing), Pavement Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Document Preparation, ADA Curb Ramp Installation (New), Repair of pedestrian hazards on pedestrian trail, Preliminary Design
Yount Street, Vine Trail,Finnell Rd at Trail ,Vineyard
Circle and Vista Dr,Vista Ct and Vista Dr,Vista Dr north of Vista Ct , Yountville Cross Rds* All locations are an estimate and have yet to be finalized.
Pre-Construction
and Construction Jul-24
11/2024
08/2025 20-40 40 3
24/25
Paving ProjectsEngineering and
Construction
This project will include: Environmental Study/Documents, Cost Estimating, Pavement Rehab/Repair (Existing), Document
Preparation, Paving and/or Striping Rehab/Repair (Existing Safety) Various locations as needed to supplement Measure T
project list Solano Avenue,Washington Street, Heather
Street. All locations are an estimate and have yet to be finalized.
Pre-Construction
and Construction
07/2024
12/2024
10/2024
08/2025 5-15 40 3