FY Proposed Title Description Location Components Est Start Est Completion
Est Useful Life Assembly Senate Est. Cost
25/26
Curb, Gutter Sidewalk
and or ADA Ramp
Replacement
This project will include: Sidewalk and/or Crosswalk Installation (New), Cost Estimating, ADA Curb Ramp Rehab/Repair (Existing), Pavement Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Document Preparation, ADA Curb Ramp Installation (New), Repair of pedestrian hazards on pedestrian trail, Preliminary Design Yount Street, Vine Trail,Finnell Rd at Trail ,Vineyard Circle and Vista Dr,Vista Ct and Vista Dr,Vista Dr north of Vista Ct , Yountville Cross Rds* All locations are an estimate and have yet to be finalized. Pre-Construction
and Construction
7/25/2025 08-
2025
11/2025
08/2026 20-40 40 3 $100,000
25/26
Paving ProjectsEngineering and
Construction
This project will include: Environmental Study/Documents, Cost Estimating, Pavement Rehab/Repair (Existing), Document Preparation, Paving and/or Striping Rehab/Repair (Existing Safety)
Various locations as needed to supplement Measure T
project list ,Washington Street, Heather Street. All locations are an estimate and have yet to be finalized.
Pre-Construction
and Construction
07/2025
12/2025
10/2025
08/2026
5-15 40 3 $60,000
Exhibit A- FY 2025-26 Proposed Project List SB1: The Road Repair Accountability Act